WorldWideScience

Sample records for pilot plant study

  1. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  2. Dissolution studies with pilot plant and actual INTEC calcines

    International Nuclear Information System (INIS)

    Herbst, R.S.; Garn, T.G.

    1999-01-01

    The dissolution of Idaho Nuclear Technology and Engineering Center (INTEC) pilot plant calcines was examined to determine solubility of calcine matrix components in acidic media. Two representatives pilot plant calcine types were studied: Zirconia calcine and Zirconia/Sodium calcine. Dissolution of these calcines was evaluated using lower initial concentrations of nitric acid than used in previous tests to decrease the [H+] concentration in the final solutions. Lower [H+] concentrations contribute to more favorable TRUEX/SREX solvent extraction flowsheet performance. Dissolution and analytical results were also obtained for radioactive calcines produced using high sodium feeds blended with non-radioactive Al(NO 3 ) 3 solutions to dilute the sodium concentration and prevent bed agglomeration during the calcination process. Dissolution tests indicated >95 wt.% of the initial calcine mass can be dissolved using the baseline dissolution procedure, with the exception that higher initial nitric acid concentrations are required. The higher initial acid concentration is required for stoichiometric dissolution of the oxides, primarily aluminum oxide. Statistically designed experiments using pilot plant calcine were performed to determine the effect of mixing rate on dissolution efficiency. Mixing rate was determined to provide minimal effects on wt.% dissolution. The acid/calcine ratio and temperature were the predominate variables affecting the wt.% dissolution, a result consistent with previous studies using other similar types of pilot plant calcines

  3. Pilot plant study

    International Nuclear Information System (INIS)

    Morris, M.E.

    1978-01-01

    Sandia Laboratories undertook the design and fabrication of an 8 ton/day dry sewage sludge irradiatior. The facility is intended (1) to function as a high-gamma-dose rate research facility; (2) to be a testbed for the unique electrical and mechanical components to be used in larger facilities; (3) to fulfill the formal requirements of a pilot plant so that design and construction of a demonstration facility could proceed; and (4) to provide accurate data base on construction and operating experience for the Environmental Impact Assessment (EIA), the Safety Analysis Report (SAR), and the cost analyses for a larger facility. The facility and its component systems are described in detail

  4. DU-AGG pilot plant design study

    International Nuclear Information System (INIS)

    Lessing, P.A.; Gillman, H.

    1996-07-01

    The Idaho National Engineering Laboratory (INEL) is developing new methods to produce high-density aggregate (artificial rock) primarily consisting of depleted uranium oxide. The objective is to develop a low-cost method whereby uranium oxide powder (UO[sub 2], U[sub 3]O[sub ]8, or UO[sub 3]) can be processed to produce high-density aggregate pieces (DU-AGG) having physical properties suitable for disposal in low-level radioactive disposal facilities or for use as a component of high-density concrete used as shielding for radioactive materials. A commercial company, G-M Systems, conducted a design study for a manufacturing pilot plant to process DU-AGG. The results of that study are included and summarized in this report. Also explained are design considerations, equipment capacities, the equipment list, system operation, layout of equipment in the plant, cost estimates, and the proposed plan and schedule

  5. Electroosmotically enhanced sludge dewatering-pilot-plant study

    CSIR Research Space (South Africa)

    Smollen, M

    1994-01-01

    Full Text Available role in determining the ease or difficulty of phase separation. It seems that the inefficiency of dewatering applied to gelatinous and fine-particle sludges can be overcome by mechanical dewatering enhanced by electroosmosis. A prototype pilot-plant...

  6. [Yield of starch extraction from plantain (Musa paradisiaca). Pilot plant study].

    Science.gov (United States)

    Flores-Gorosquera, Emigdia; García-Suárez, Francisco J; Flores-Huicochea, Emmanuel; Núñez-Santiago, María C; González-Soto, Rosalia A; Bello-Pérez, Luis A

    2004-01-01

    In México, the banana (Musa paradisiaca) is cooked (boiling or deep frying) before being eaten, but the consumption is not very popular and a big quantity of the product is lost after harvesting. The unripe plantain has a high level of starch and due to this the use of banana can be diversified as raw material for starch isolation. The objective of this work was to study the starch yield at pilot plant scale. Experiments at laboratory scale were carried out using the pulp with citric acid to 0,3 % (antioxidant), in order to evaluate the different unitary operations of the process. The starch yield, based on starch presence in the pulp that can be isolated, were between 76 and 86 %, and the values at pilot plant scale were between 63 and 71 %, in different lots of banana fruit. Starch yield values were similar among the diverse lots, showing that the process is reproducible. The lower values of starch recovery at pilot plant scale are due to the loss during sieving operations; however, the amount of starch recovery is good.

  7. Study on designing a complete pilot plant for processing sandstone ores in Palua-Parong area

    International Nuclear Information System (INIS)

    Le Quang Thai; Tran Van Son; Tran The Dinh; Trinh Nguyen Quynh; Vu Khac Tuan

    2015-01-01

    Design work is the first step of the construction and operation of pilot plant. Thus, the project Study on designing a complete pilot plant for processing sandstone ores in Palua - Parong area was conducted to design a pilot plant for testing entire technological process to obtain yellowcake. Based on a literature review of uranium ore processing technology in the world, information of ore and previous research results of uranium ore in PaLua - PaRong area at the Institute for Technology of Radioactive and Rare Elements, a suitable technological flowsheet for processing this ore has been selected. The size, location of the pilot plant and planed experiments has been selected during the implementation of this project, in which basic parameters, designed system of equipment, buildings, ect. were also calculated. (author)

  8. Pilot plant study for ethanol production

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J S [Korea Inst. of Science and Technology, Seoul (Korea, Republic of)

    1996-02-01

    Most of domestic alcohol fermentation factory adopt batch process of which productivity is lower than continuous fermentation process. They have made great effort to increase productivity by means of partial unit process automatization and process improvement with their accumulated experience but there is technical limitation in productivity of batch fermentation process. To produce and supply fuel alcohol, economic aspects must be considered first of all. Therefore, development of continuous fermentation process, of which productivity is high, is prerequisite to produce and use fuel alcohol but only a few foreign company possess continuous fermentation technic and use it in practical industrial scale fermentation. We constructed pilot plant (5 Stage CSTR 1 kl 99.5 v/v% ethanol/Day scale) to study some aspects stated below and our ultimate aims are production of industrial scale fuel alcohol and construction of the plant by ourselves. Some study concerned with energy saving separation and contamination control technic were entrusted to KAIST, A-ju university and KIST respectively. (author) 67 refs., 100 figs., 58 tabs.

  9. Pilot plant studies of the bioconversion of cellulose and production of ethanol

    Energy Technology Data Exchange (ETDEWEB)

    Wilke, C.R.

    1977-09-30

    Work for the period July 1 to September 30, 1977 is summarized briefly. Results of the following studies are reported: analysis and evaluation of potential raw materials--chemical analysis of the Kudzu plant and effect of NO/sub x/ pretreatments on the hydrolysis of wheat straw; utilization of hemicellulose sugars; process design and economic studies--hydrolysis process and ethanol fermentation; pilot plant process development and design studies--enhanced cellulase production and continuous hydrolysis. (JGB)

  10. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  11. Laboratory and pilot-plant studies on the conversion of uranyl nitrate hexahydrate to UF6 by fluidized-bed processes

    International Nuclear Information System (INIS)

    Youngblood, E.L.; Urza, I.J.; Cathers, G.I.

    1977-06-01

    This report describes laboratory and pilot-plant studies on the conversion of uranyl nitrate hexahydrate (UNH) to UF 6 and on purification of the UF 6 . Experimental laboratory studies on the removal of residual nitrate from uranium trioxide (UO 3 ) calcine and the fluorination of technetium and subsequent sorption on MgF 2 were conducted to support the pilot-plant work. Two engineering-scale pilot plants utilizing fluidized-bed processes were constructed for equipment and process testing of the calcination of UNH to UO 3 and the direct fluorination of UO 3 to UF 6

  12. Process Experimental Pilot Plant

    International Nuclear Information System (INIS)

    Henze, H.

    1986-01-01

    The Process Experimental Pilot Plant (PREPP) at the Idaho National Engineering Laboratory (INEL) was built to convert transuranic contaminated solid waste into a form acceptable for disposal at the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico. There are about 2.0 million cubic ft of transuranic waste stored at the Transuranic Storage Area of the INEL's Radioactive Waste Management Complex (RWMC). The Stored Waste Examination Pilot Plant (SWEPP) located at the RWMC will examine this stored transuranic waste to determine if the waste is acceptable for direct shipment to and storage at WIPP, or if it requires shipment to PREPP for processing before shipment to WIPP. The PREPP process shreds the waste, incinerates the shredded waste, and cements (grouts) the shredded incinerated waste in new 55-gal drums. Unshreddable items are repackaged and returned to SWEPP. The process off-gas is cleaned prior to its discharge to the atmosphere, and complies with the effluent standards of the State of Idaho, EPA, and DOE. Waste liquid generated is used in the grouting operation

  13. Plan for the civil reprocessing pilot plant of China

    International Nuclear Information System (INIS)

    Wang, D.Y.; Chen, M.

    1987-01-01

    Based on the R and D work, experience on plant operation and site situation, the necessity and feasibility of building a pilot plant for civil reprocessing in China are discussed. The capacity of 100 kg HM/day (LWR) and 3 kg HM/day (MTR) has been proposed. The plant consists of cold testing facility and hot pilot facility. It is expected to complete the pilot plant in 1990's. This paper also describes the purpose, scale, process and equipment of the pilot plant

  14. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  15. Ion exchange/adsorbent pilot plant

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    A decontamination of greater than 99% of the actinides and fission products contained in radioactive waste water can be obtained using ion exchange resins. A system for achieving this result is described in this paper. This ion exchange pilot-plant design is the culmination of five years of study of the decontamination of radioactive waste streams by ion exchange resins and other adsorbents at Mound. In order to maintain maximum flexibility of treatments, this pilot-plant design is a conceptual design with specific flows, resins, and column specifications, but with many optional features and no rigid equipment specifications. This flexibility allows the system to be amenable to almost any radioactive waste stream. Very specific designs can be constructed from this conceptual design for the treatment of any specific waste stream. Operating and capital costs are also discussed. 1 figure, 5 tables

  16. Hydrologic studies for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Davies, P.B.

    1994-01-01

    The objective of this paper is to provide a general overview of hydrologic conditions at the Waste Isolation Pilot Plant (WIPP) by describing several key hydrologic studies that have been carried out as part of the site characterization program over the last 20 years. The paper is composed of three parts: background information about general objectives of the WIPP project; information about the geologic and hydrologic setting of the facility; and information about three aspects of the hydrologic system that are important to understanding the long-term performance of the WIPP facility. For additional detailed information, the reader is referred to the references cited in the text

  17. Laboratory and pilot-plant studies on the conversion of uranyl nitrate hexahydrate to UF/sub 6/ by fluidized-bed processes

    Energy Technology Data Exchange (ETDEWEB)

    Youngblood, E.L.; Urza, I.J.; Cathers, G.I.

    1977-06-01

    This report describes laboratory and pilot-plant studies on the conversion of uranyl nitrate hexahydrate (UNH) to UF/sub 6/ and on purification of the UF/sub 6/. Experimental laboratory studies on the removal of residual nitrate from uranium trioxide (UO/sub 3/) calcine and the fluorination of technetium and subsequent sorption on MgF/sub 2/ were conducted to support the pilot-plant work. Two engineering-scale pilot plants utilizing fluidized-bed processes were constructed for equipment and process testing of the calcination of UNH to UO/sub 3/ and the direct fluorination of UO/sub 3/ to UF/sub 6/.

  18. Fiscal 1997 report of the development of high efficiency waste power generation technology. No.2 volume. Pilot plant verification test; Kokoritsu haikibutsu hatsuden gijutsu kaihatsu (pilot plant jissho shiken). 1997 nendo hokokusho (daini bunsatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    As to a high efficiency waste power generation system using general waste as fuel, the details of the following were described: design/construction management and operational study of pilot plant, design/manufacture/construction of pilot plant, and study of an optimal total system. Concerning the construction management and operational study, the paper described the application for governmental/official inspection procedures and taking inspection, process management of pilot plant, site patrol, safety management, management of trial run of pilot plant, drawing-up of a verification test plan and test run, etc. Relating to the design/manufacture/construction of pilot plant, an outline of the pilot plant was described. The paper also stated points to be considered in design of furnace structure and boiler structure, points to be considered of the verification test, etc. As to the study of an optimal total system, the following were described: survey of waste gasification/slagging power generation technology, basic study on RDF production process, survey of trends of waste power generation technology in the U.S., etc. 52 refs., 149 figs., 121 tabs.

  19. Waste Isolation Pilot Plant: Alcove Gas Barrier trade-off study

    International Nuclear Information System (INIS)

    Lin, M.S.; Van Sambeek, L.L.

    1992-07-01

    A modified Kepner-Tregoe method was used for a trade-off study of Alcove Gas Barrier (AGB) concepts for the Waste Isolation Pilot Plant. The AGB is a gas-constraining seal to be constructed in an alcove entrance drift. In this trade-off study, evaluation criteria were first selected. Then these criteria were classified as to their importance to the task, assigning a weighting value to each aspect. Eleven conceptual design alternatives were developed based on geometrical/geological considerations, construction materials, constructibility, and other relevant factors and evaluated

  20. A soil washing pilot plant for removing petroleum hydrocarbons from contaminated soils

    International Nuclear Information System (INIS)

    Toor, I.A.; Roehrig, G.R.

    1992-01-01

    A soil washing pilot plant was built and tested for its ability to remove petroleum hydrocarbons from certain soils. The ITEX soil washing pilot plant is a trailer mountable mobile unit which has a washing capacity of two tons per hour of contaminated soils. A benchscale study was carried out prior to the fabrication of the pilot plant. The first sample was contaminated with diesel fuel while the second sample was contaminated with crude oil. Various nonionic, cationic and anionic cleaning agents were evaluated for their ability to remove petroleum hydrocarbons from these materials. The nonionic cleaning agents were more successful in cleaning the soils in general. The ultimate surfactant choice was based on several factors including cost, biodegradability, cleaning efficiency and other technical considerations. The soil samples were characterized in terms of their particle size distributions. Commercial diesel fuel was carefully mixed in this sand to prepare a representative sample for the pilot plant study. Two pilot runs were made using this material. A multistage washing study was also conducted in the laboratory which indicates that the contamination level can be reduced to 100 ppm using only four stages. Because the pilot plant washing efficiency is twice as high, it is believed that ultimate contamination levels can be reduced to lower levels using the same number of stages. However, this hypothesis has not been demonstrated to date

  1. Conceptual design of a lunar oxygen pilot plant Lunar Base Systems Study (LBSS) task 4.2

    Science.gov (United States)

    1988-01-01

    The primary objective was to develop conceptual designs of two pilot plants to produce oxygen from lunar materials. A lunar pilot plant will be used to generate engineering data necessary to support an optimum design of a larger scale production plant. Lunar oxygen would be of primary value as spacecraft propellant oxidizer. In addition, lunar oxygen would be useful for servicing nonregenerative fuel cell power systems, providing requirements for life support, and to make up oxygen losses from leakage and airlock cycling. Thirteen different lunar oxygen production methods are described. Hydrogen reduction of ilmenite and extraction of solar-wind hydrogen from bulk lunar soil were selected for conceptual design studies. Trades and sensitivity analyses were performed with these models.

  2. Pilot and pilot-commercial plants for reprocessing spent fuels of FBR type reactors

    International Nuclear Information System (INIS)

    Shaldaev, V.S.; Sokolova, I.D.

    1988-01-01

    A review of modern state of investigations on the FBR mixed oxide uranium-plutonium fuel reprocessing abroad is given. Great Britain and France occupy the leading place in this field, operating pilot plants of 5 tons a year capacity. Technology of spent fuel reprocessing and specific features of certain stages of the technological process are considered. Projects of pilot and pilot-commercial plants of Great Britain, France, Japan, USA are described. Economic problems of the FBR fuel reprocessing are touched upon

  3. Ningyo Toge uranium enrichment pilot plant comes into full

    International Nuclear Information System (INIS)

    1982-01-01

    The uranium enrichment pilot plant of the Power Reactor and Nuclear Fuel Development Corporation at Ningyo Toge went into full operation on March 26, 1982. This signifies that the front end of the nuclear fuel cycle in Japan, from uranium ore to enrichment, is only a step away from commercialization. On the same day, the pilot plant of uranium processing and conversion to UF 6 , the direct purification of uranium ore into uranium hexafluoride, began batch operation at the same works. The construction of the uranium enrichment pilot plant has been advanced in three stages: i.e. OP-1A with 1000 centrifuges, OP-1B with 3000 centrifuges and OP-2 with 3000 centrifuges. With a total of 7000 centrifuges, the pilot plant, the first enrichment plant in Japan, has now a capacity of supplying enriched uranium for six months operation of a 1,000 MW nuclear power plant. (J.P.N.)

  4. PILOT PLANT STUDY ON NATURAL WATER COAGULANTS AS COAGULAN AIDS FOR WATER SUPPLY

    Directory of Open Access Journals (Sweden)

    B BINA

    2001-06-01

    Full Text Available Introduction: Natural plant coagulants have an important role to play in provision of portable water to rural communities in the developing world. The plant material that their coagulation properties have been confirmed in previous lab scale studies and can be found widely in Iran was selected as coagulant aids. Pilot plant study was done to evaluate the efficiency of natural material such as Starch/Gum Tragacanth, Fenugreek and Yeast as coagulant aids in conjunction with comercial alum. Methods: The pilot was placed in Isfahan Water Treatment Plant (IWTP and efficiency of these materials in removal of turbidity from raw water enters the IWTP was evaluated. The results indicated while these materials were used as coagulant aids in concentration of 1-5 mg/l conjunction with alum are able to reduced the turbidity and final residuals turbidity meets the standards limits. Results: The coagulation efficiency of these material were found to be effected by certain physico-chemical factors, namely, concentration of suspended solids, divalent cation metal and time of agitation. The relative importance of these variable was evaluated. The results of COD test proved that the natural coagulant aids in the optimum doses produce no any significant organic residual. Discussion: Economical considerations showed that using of these material as coagulant aids can cause reduction in alum consumption and in some cases are more econmical than synthetic polyelectrolyte.

  5. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  6. Development of 1000kW-class MCFC pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Ooue, M.; Yasue, H. [MCFC Research Association, Mie (Japan); Takasu, K.; Tsuchitori, T.

    1996-12-31

    This pilot plant is a part of the New Sunshine Program which has proceeded by the Agency of Industrial Science and Technology of the Ministry of International Trade and Industry. MCFC Research Association is entrusted with the development of the pilot plant, and constructing it at Kawagoe site. Following items will be verified by this pilot plant operation. (a) Development of 250kW class stack and confirmation of stack performance and decay rate. (b) System verification such as basic process, control system and operation characteristics, toward commercialization. (c) To get design data for demonstration plant.

  7. Study in pilot plant of the Itataia phosphoro-uraniferous ore - CE (Brazil)

    International Nuclear Information System (INIS)

    Reis Junior, J.B.; Aquino, J.A. de; Oliveira Luz, I.L. de.

    1987-01-01

    Pilot plant data have been obtained for the physical treatment studies of the Itataia, phosphoro-uraniferous ore body located in the state of Ceara-Brazil. Due to the presence of the silic-carbonated gangue, which turns the ore complex, the pilot plant operation comprised 1200 hours. From the results obtained, it was possible to stablish a basic flowsheet for the concentration process. Such process includes a grinding step followed by a cyclone disliming (d 50 =10μm). The cyclone underflow feeds the flotation step. The conventional flotation process, which envolves the direct phosphate flotation followed by cleaning steps, was not efficient due to the presence of the carbonated gangue. In fact, the presence of silicates and carbonates in the gangue required that the flotation would be carried out in two steps. The silicated gangue is eliminated in the first flotation and a phosphate concentrate with significant amount of carbonates is obtained. This concentrate is fed to the second flotation step, termed reverse flotation, where the calcite is floated and the apatite is depressed. (Author) [pt

  8. Study in pilot plant of the Itataia phosphoro-uraniferous ore (CE,Brazil)

    International Nuclear Information System (INIS)

    Reis Junior, J.B.; Aquino, J.A. de; Oliveira Luz, I.L. de

    1985-01-01

    Pilot plant data have been obtained for the physical treatment studies of the Itataia, phosphoro-uraniferous ore body located in the state of Ceara-Brazil. Due to the presence of the silic-carbonated gangue, which turns the ore complex, the pilot plant operation comprised 1200 hours. From the results obtained, it was possible to establish a basic flowsheet for the concentration process. Such process includes a grinding step (-65) followed by a cyclone disliming (d50 = 10μ). The cyclone underflow feeds the flotation step. The conventional flotation process, which envolves the direct phosphate flotation followed by cleaning steps, was not efficient due to the presence of the carbonated gangue. In fact, the presence of silicates and carbonates in the gangue required that the flotation would be carried out in two steps. The silicated gangue is eliminated in the first flotation and a phosphate concentrate with significant amount of carbonates is obtained. This concentrate is fed to the second flotation step, termed reverse flotation, where the calcite is floated and the apatite is depressed. (Author) [pt

  9. Waste Isolation Pilot Plant Overview

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Douglas James [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-27

    The mission of Waste Isolation Pilot Plant (WIPP) is to demonstrate the safe, environmentally sound, cost effective, permanent disposal of Transuranic (TRU) waste left from production of nuclear weapons.

  10. Summary of the achievements in fiscal 1991 in developing the coal liquefaction technology and the bituminous coal liquefaction technology. Studies by using a pilot plant; 1991 nendo sekitan ekika gijutsu kaihatsu rekiseitan ekika gijutsu no kaihatsu seika gaiyo. Pilot plant ni yoru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    This paper describes the achievements in 1991 on studies on the bituminous coal liquefaction technology using a pilot plant. Based on the detailed design of the 150-t/d pilot plant, study problems and analysis items were reviewed, and a material balance acquiring method and a reaction column data analyzing method were discussed. Utilization of the liquefaction simulator was attempted. Efficient execution of the pilot plant operation study requires to have the basic and support study achievements reflected on the pilot plant operation, and clarify the roles to be played by the groups. Therefore, discussion items were compiled. The overall process plan for the design and construction was reviewed based on the plan discussed in fiscal 1990. Fiscal 1991 has launched common civil engineering constructions. The operation plans for the main four facilities in the pilot plant, which have been prepared in fiscal 1988, were continued of reviewing to cope with the situation of the decreased construction budget. The budget was reviewed again in fiscal 1991, which would present a prospect of starting the operation in fiscal 1995. Annual reviews on the basic operation plans for the main four facilities and the conceptions taken to date were put into order. The project management system was also expanded and re-arranged, including the information registration and retrieval system. (NEDO)

  11. Water Treatment Pilot Plant Design Manual: Low Flow Conventional/Direct Filtration Water Treatment Plant for Drinking Water Treatment Studies

    Science.gov (United States)

    This manual highlights the project constraints and concerns, and includes detailed design calculations and system schematics. The plant is based on engineering design principles and practices, previous pilot plant design experiences, and professional experiences and may serve as ...

  12. Cold flow model study of an oxyfuel combustion pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Guio-Perez, D.C.; Tondl, G.; Hoeltl, W.; Proell, T.; Hofbauer, H. [Vienna University of Technology, Institute of Chemical Engineering, Vienna (Austria)

    2011-12-15

    The fluid-dynamic behavior of a circulating fluidized bed pilot plant for oxyfuel combustion was studied in a cold flow model, down-scaled using Glicksman's criteria. Pressures along the unit and the global circulation rate were used for characterization. The analysis of five operating parameters and their influence on the system was carried out; namely, total solids inventory and the air velocity of primary, secondary, loop seal and support fluidizations. The cold flow model study shows that the reactor design allows stable operation at a wide range of fluidization rates, with results that agree well with previous observations described in the literature. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  13. Pilot plant study for treating sewage in the waste water treatment plant at Crevillente-Derramador, Alicante, Spain; Estudio con plant piloto para el tratamiento de aguas residuales en la EDAR de Crevillente-Derramador (Alicante)

    Energy Technology Data Exchange (ETDEWEB)

    Morenilla Martinez, J. J.; Bernacer Bonora, I.; Santos Asensi, J. M.; Martinez Muro, M. A.; Sanchez Ventral, A.; Martinez Cosin, J. M.

    2002-07-01

    It is much easier to carry out preliminary studies before a waste water treatment plant is built or enlarged or to identify existing problems and their possible solutions by using a portable pilot plant that is capable of operating under real conditions using the actual waste water that is causing the problem. A pilot plant was used to conduct treatability studies on the ground in the waste water treatment plant at Crevillente-Derramador, Alicante, Spain. The project was set up and directed by the Public Waste Water Treatment Agency of the Autonomous Community of Valencia. The work was aimed at finding a solution to existing problems in the plant and in pre dimensioning its future facilities. (Author) 8 refs.

  14. Pilot plant studies of the bioconversion of cellulose and production of ethanol

    Energy Technology Data Exchange (ETDEWEB)

    Wilke, C.R.

    1977-01-31

    Progress is reported in several areas of research. The following cellulosic raw materials were selected for study: wheat, barley, and rice straws, rice hulls, sorghum, corn stover, cotton gin trash, newsprint, ground wood, and masonite steam-treated Douglas fir and redwood. Samples were collected, prepared, and analyzed for hexosans, pentosans, lignin, ash, and protein. Results of acid extraction and enzymatic hydrolysis are discussed. Yields of glucose, polyglucose, xylose, and arabinose are reported. Progress in process design and economic studies, as well as pilot plant process development and design studies, is summarized. (JGB)

  15. WIPP: Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of the Waste Isolation Pilot Plant are discussed briefly: history and site selection; salt as a disposal medium; transporting waste materials; early key events; impacts on New Mexico; project organization; and site certification profile

  16. Pilot plant of continuous ion-exchange in fluidized bed

    International Nuclear Information System (INIS)

    Botella, T.; Otero de Becerra, J.; Gasos, P.

    1985-01-01

    Research and development on continuous ion-exchange processes has been a major item in hydrometallurgy. This new technology has been under development during the last 15 years in the leading countries at uranium hydrometallurgy. The fluidized bed multi-stage column technique is proven to be the most attractive one, and since 1977 several commercial plants have begun production, some of them with a throughput of 500 cubic meters of pregnant liquour per hour. J.E.N. undertook the study of this new technology for uranium recovery in the early 70's. In 1979 a pilot plant had been installed, based on previous laboratory and smaller pilot plant experience. The plant was designed following JEN's own technology and has been operating successfully at a flow rate of near 0.5 cubic meters per hour. The test runs and the main processing, engineering and operation features are described. At present a demonstation plant is under design, and this installation will provide the necessary know-how for the construction and operation of a commercial scale plant. (author)

  17. Pilot studies of management of ageing of nuclear power plant instrumentation and control components

    International Nuclear Information System (INIS)

    Burnay, S.G.; Simola, K.; Kossilov, A.; Pachner, J.

    1993-01-01

    This paper describes pilot studies which have been implemented to study the aging behavior of safety related component parts of nuclear power plants. In 1989 the IAEA initiated work on pilot studies related to the aging of such components. Four components were identified for study. They are the primary nozzle of a reactor vessel; a motor operated isolating valve; the concrete containment building; and instrumentation and control cables within the containment facility. The study was begun with phase 1 efforts directed toward understanding the aging process, and methods for monitoring and minimizing the effects of aging. Phase 2 efforts are directed toward aging studies, documentation of the ideas put forward, and research to answer questions identified in phase 1. This paper describes progress made on two of these components, namely the motor operated isolation valves, and in-containment I ampersand C cables

  18. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  19. Laboratory and pilot plant studies for the recovery of uranium from phosphoric acid by the D2EHPA-TOPO process

    International Nuclear Information System (INIS)

    Botella, T.; Gasos, P.

    1989-01-01

    The activities and costs involved in laboratory and pilot plant studies are discussed as applied to the D2EHPA-TOPO process. The overall capital investment (including engineering) for a plant with a throughput of 12 cubic meters of acid/day has been estimated to be around one million US dollars. Operating costs per year, without considering amortization and labor, are over 20,000 US dollars. A total time of 3,5 years (including engineering, purchase and pilot plant tests) could be needed to obtain the information required for final scale-up. (author). 40 refs, 1 fig., 5 tabs

  20. Application of remedy studies to the development of a soil washing pilot plant that uses mineral processing technology: a practical experience

    International Nuclear Information System (INIS)

    Richardson, W.S.; Phillips, C.R.; Hicks, R.; Luttrell, J.; Cox, C.

    1999-01-01

    Soil washing employing mineral processing technology to treat radionuclide-contaminated soils has been examined as a remedy alternative to the exclusive excavation, transportation, and disposal of the soil. Successful application depends on a thorough remedy study, employing a systematic tiered approach that is efficient, self-limiting, and cost effective. The study includes: (1) site and soil characterization to determine the basic mineral and physical properties of both the soil and contaminants and to identify their relative associations; (2) treatment studies to evaluate the performance of process units for contaminant separation; (3) conceptual process design to develop a treatment pilot plant; and (4) engineering design to construct, test, and optimize the actual full-scale plant. A pilot plant using soil washing technology for the treatment of radium-contaminated soil was developed, tested, and demonstrated. The plant used particle-size separation to produced a remediated product that represented approximately 50% of the contaminated soil. Subsequently, it was modified for more effective performance and application to soil with alternate characteristics; it awaits further testing. The economic analysis of soil washing using the pilot plant as a model indicates that a remedy plan based on mineral processing technology is very competitive with the traditional alternative employing excavation, transportation, and disposal exclusively, even when disposal costs are modest or when recovery of remediated soil during treatment is low. This paper reviews the tiered approach as it applies to mineral processing technology to treat radionuclide-contaminated soils and a pilot plant developed to test the soil washing process. (Copyright (c) 1999 Elsevier Science B.V., Amsterdam. All rights reserved.)

  1. Progress in Developing a High-Availability Advanced Tokamak Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, T.; Goldston, R.; Kessel, C.; Neilson, G.; Menard, J.; Prager, S.; Scott, S.; Titus, P.; Zarnstorff, M., E-mail: tbrown@pppl.gov [Princeton University, Princeton Plasma Physics Laboratory, Princeton (United States); Costley, A. [Henley on Thames (United Kingdom); El-Guebaly, L. [University of Wisconsin, Madison (United States); Malang, S. [Fusion Nuclear Technology Consulting, Linkenheim (Germany); Waganer, L. [St. Louis (United States)

    2012-09-15

    Full text: A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The mission of the pilot plant was set to encompass component test and fusion nuclear science missions yet produce net electricity with high availability in a device designed to be prototypical of the commercial device. The objective of the study was to evaluate three different magnetic configuration options, the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS) in an effort to establish component characteristics, maintenance features and the general arrangement of each candidate device. With the move to look beyond ITER the fusion community is now beginning to embark on DEMO reactor studies with an emphasis on defining configuration arrangements that can meet a high availability goal. In this paper the AT pilot plant design will be presented. The selected maintenance approach, the device arrangement and sizing of the in-vessel components and details of interfacing auxiliary systems and services that impact the ability to achieve high availability operations will be discussed. Efforts made to enhance the interaction of in-vessel maintenance activities, the hot cell and the transfer process to develop simplifying solutions will also be addressed. (author)

  2. General Atomic Reprocessing Pilot Plant: engineering-scale dissolution system description

    International Nuclear Information System (INIS)

    Yip, H.H.

    1979-04-01

    In February 1978, a dissolver-centrifuge system was added to the cold reprocessing pilot plant at General Atomic Company, which completed the installation of an HTGR fuel head-end reprocessing pilot plant. This report describes the engineering-scale equipment in the pilot plant and summarizes the design features derived from development work performed in the last few years. The dissolver operating cycles for both thorium containing BISO and uranium containinng WAR fissile fuels are included. A continuous vertical centrifuge is used to clarify the resultant dissolver product solution. Process instrumentation and controls for the system reflect design philosophy suitable for remote operation

  3. The pilot plant for electron beam food processing

    Science.gov (United States)

    Migdal, W.; Walis, L.; Chmielewski, A. G.

    1993-07-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plant is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established.

  4. The pilot plant for electron beam food processing

    International Nuclear Information System (INIS)

    Migdal, W.; Kosmal, W.; Malec-Czechowska, K.; Maciszewski, W.

    1992-01-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plants is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established. (author). 9 refs, 5 figs, 1 tab

  5. Pilot plant for exploitation of geothermal waters

    Directory of Open Access Journals (Sweden)

    Stojiljković Dragan T.

    2006-01-01

    Full Text Available In Sijarinska spa, there are some 15 mineral and thermomineral springs, that are already being used for therapeutic purposes. For the exploitation of heat energy boring B-4 is very interesting. It is a boring of a closed type, with the water temperature of about 78°C and a flow rate of about 33 l/s. Waters with the flow rate of about 6 l/s are currently used for heating of the Gejzer hotel, and waters of the flow rate of about 0,121 l/s for the pilot drying plant. The paper presents this pilot plant. .

  6. The UCOR pilot plant and the development of axial flow compressors

    International Nuclear Information System (INIS)

    Grant, W.

    1984-01-01

    This article discusses some of the mechanical aspects of the Uranium Enrichment Corporation of South Africa (Pty) Ltd. (UCOR) pilot plant. The most important mechanical components in a typical stage in the pilot plant, consists of a compressor which is used to compress the process gas mixture. After air cooling to almost room temperature, the mixture is fed through the separation elements. Other components are two pressure vessels connected to the compressor. The development and characteristics of the pilot plant is described in the article

  7. Waste Isolation Pilot Plant transuranic wastes experimental characterization program: executive summary

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1978-11-01

    A general overview of the Waste Isolation Pilot Plant transuranic wastes experimental characterization program is presented. Objectives and outstanding concerns of this program are discussed. Characteristics of transuranic wastes are also described. Concerns for the terminal isolation of such wastes in a deep bedded salt facility are divided into two phases, those during the short-term operational phase of the facility, and those potentially occurring in the long-term, after decommissioning of the repository. An inclusive summary covering individual studies, their importance to the Waste Isolation Pilot Plant, investigators, general milestones, and comments are presented

  8. Systematic simulation of a tubular recycle reactor on the basis of pilot plant experiments

    Energy Technology Data Exchange (ETDEWEB)

    Paar, H; Narodoslawsky, M; Moser, A [Technische Univ., Graz (Austria). Inst. fuer Biotechnologie, Mikrobiologie und Abfalltechnologie

    1990-10-10

    Systematic simulatiom may decisively help in development and optimization of bioprocesses. By applying simulation techniques, optimal use can be made of experimental data, decreasing development costs and increasing the accuracy in predicting the behavior of an industrial scale plant. The procedure of the dialogue between simulation and experimental efforts will be exemplified in a case study. Alcoholic fermentation of glucose by zymomonas mobilis bacteria in a gasified turbular recycle reactor was studied first by systematic simulation, using a computer model based solely on literature data. On the base of the results of this simulation, a 0.013 m{sup 3} pilot plant reactor was constructed. The pilot plant experiments, too, were based on the results of the systematic simulation. Simulated and experimental data were well in agreement. The pilot plant experiments reiterated the trends and limits of the process as shown by the simulation results. Data from the pilot plant runs were then used to improve the simulation model. This improved model was subsequently used to simulate the performances of an industrial scale plant. The results of this simulation are presented. They show that the alcohol fermentation in a tubular recycle reactor is potentially advantageous to other reactor configurations, especially to continuous stirred tanks. (orig.).

  9. A realistic approach to modeling an in-duct desulfurization process based on an experimental pilot plant study

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz, F.J.G.; Ollero, P. [University of Seville, Seville (Spain)

    2008-07-15

    This paper has been written to provide a realistic approach to modeling an in-duct desulfurization process and because of the disagreement between the results predicted by published kinetic models of the reaction between hydrated lime and SO{sub 2} at low temperature and the experimental results obtained in pilot plants where this process takes place. Results were obtained from an experimental program carried out in a 3-MWe pilot plant. Additionally, five kinetic models, from the literature, of the reaction of sulfation of Ca(OH){sub 2} at low temperatures were assessed by simulation and indicate that the desulfurization efficiencies predicted by them are clearly lower than those experimentally obtained in our own pilot plant as well as others. Next, a general model was fitted by minimizing the difference between the calculated and the experimental results from the pilot plant, using Matlab{sup TM}. The parameters were reduced as much as possible, to only two. Finally, after implementing this model in a simulation tool of the in-duct sorbent injection process, it was validated and it was shown to yield a realistic approach useful for both analyzing results and aiding in the design of an in-duct desulfurization process.

  10. Improvement of water treatment pilot plant with Moringa oleifera extract as flocculant agent.

    Science.gov (United States)

    Beltrán-Heredia, J; Sánchez-Martín, J

    2009-05-01

    Moringa oleifera extract is a high-capacity flocculant agent for turbidity removal in surface water treatment. A complete study of a pilot-plant installation has been carried out. Because of flocculent sedimentability of treated water, a residual turbidity occured in the pilot plant (around 30 NTU), which could not be reduced just by a coagulation-flocculation-sedimentation process. Because of this limitation, the pilot plant (excluded filtration) achieved a turbidity removal up to 70%. A slow sand filter was put in as a complement to installation. A clogging process was characterized, according to Carman-Kozeny's hydraulic hypothesis. Kozeny's k parameter was found to be 4.18. Through fouling stages, this k parameter was found to be up to 6.36. The obtained data are relevant for the design of a real filter in a continuous-feeding pilot plant. Slow sand filtration is highly recommended owing to its low cost, easy-handling and low maintenance, so it is a very good complement to Moringa water treatment in developing countries.

  11. Safety study on nuclear heat utilization system - accident delineation and assessment on nuclear steelmaking pilot plant

    International Nuclear Information System (INIS)

    Yoshida, T.; Mizuno, M.; Tsuruoka, K.

    1982-01-01

    This paper presents accident delineation and assessment on a nuclear steelmaking pilot plant as an example of nuclear heat utilization systems. The reactor thermal energy from VHTR is transported to externally located chemical process plant employing helium-heated steam reformer by an intermediate heat transport loop. This paper on the nuclear steelmaking pilot plant will describe (1) system transients under accident conditions, (2) impact of explosion and fire on the nuclear reactor and the public and (3) radiation exposure on the public. The results presented in this paper will contribute considerably to understanding safety features of nuclear heat utilization system that employs the intermediate heat transport loop and the helium-heated steam reformer

  12. Guidebook on design, construction and operation of pilot plants for uranium ore processing

    International Nuclear Information System (INIS)

    1990-01-01

    The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. 42 refs, 7 figs, 3 tabs

  13. Investigation of Parameters Affecting Gypsum Dewatering Properties in a Wet Flue Gas Desulphurization Pilot Plant

    DEFF Research Database (Denmark)

    Hansen, Brian Brun; Kiil, Søren

    2012-01-01

    of impurities (0.002 M Al2F6; 50 g quartz/L; 0.02 M Al3+, and 0.040 M Mg2+) were investigated. In addition, slurry from a full-scale wet FGD plant, experiencing formation of flat shaped crystals and poor gypsum dewatering properties, was transferred to the pilot plant to test if the plant would now start...... to time. In this work, the particle size distribution, morphology, and filtration rate of wet FGD gypsum formed in a pilot-scale experimental setup, operated in forced oxidation mode, have been studied. The influence of holding tank residence time (10–408 h), solids content (30–169 g/L), and the presence...... to produce low quality gypsum. The crystals formed in the pilot plant, on the basis of the full-scale slurry did, however, show acceptable filtration rates and crystal morphologies closer to the prismatic crystals from after pilot plant experiments with demineralized water. The gypsum slurry filtration rates...

  14. Pilot plant for flue gas treatment - continuous operation tests

    International Nuclear Information System (INIS)

    Chmielewski, A.G.; Tyminski, B.; Iller, E.; Zimek, Z.; Licki, J.; Radzio, B.

    1995-01-01

    Tests of continuous operation have been performed on pilot plant at EPS Kaweczyn in the wide range of SO 2 concentration (500-3000 ppm). The bag filter has been applied for aerosol separation. The high efficiencies of SO 2 and NO x removal, approximately 90% were obtained and influenced by such process parameters as: dose, gas temperature and ammonia stoichiometry. The main apparatus of the pilot plant (e.g. both accelerators) have proved their reliability in hard industrial conditions. (Author)

  15. Nuclear power plant control room task analysis. Pilot study for pressurized water reactors

    International Nuclear Information System (INIS)

    Barks, D.B.; Kozinsky, E.J.; Eckel, S.

    1982-05-01

    The purposes of this nuclear plant task analysis pilot study: to demonstrate the use of task analysis techniques on selected abnormal or emergency operation events in a nuclear power plant; to evaluate the use of simulator data obtained from an automated Performance Measurement System to supplement and validate data obtained by traditional task analysis methods; and to demonstrate sample applications of task analysis data to address questions pertinent to nuclear power plant operational safety: control room layout, staffing and training requirements, operating procedures, interpersonal communications, and job performance aids. Five data sources were investigated to provide information for a task analysis. These sources were (1) written operating procedures (event-based); (2) interviews with subject matter experts (the control room operators); (3) videotapes of the control room operators (senior reactor operators and reactor operators) while responding to each event in a simulator; (4) walk-/talk-throughs conducted by control room operators for each event; and (5) simulator data from the PMS

  16. Pilot studies on management of ageing of nuclear power plant components: Results of Phase 1

    International Nuclear Information System (INIS)

    1992-10-01

    To facilitate cooperation between the IAEA Member States and thus to enhance the safety and reliability of operating nuclear plants the IAEA has initiated pilot studies on the management of ageing of four representative plant components: the primary nozzle of the reactor pressure vessel, a motor operated valve, the concrete containment building and instrumentation and control cables. Phase 1 of the studies has been completed and its results are presented in this report. The report documents current understanding of ageing and methods for monitoring and mitigation of this ageing for the above components, identifies existing knowledge and technology gaps and defines follow-up work to deal with these gaps. Refs, figs and tabs

  17. Long term pilot plant experience on aromatics extraction with ionic liquids

    NARCIS (Netherlands)

    Meindersma, W.G.W.; Onink, F.S.A.F.; Hansmeier, A.R.; Haan, de A.B.

    2012-01-01

    Since 2004, we have been conducting pilot plant trials with various contactors and different ionic liquids for petrochemical model feeds as well as real refinery feeds. Our pilot plant contains a Rotating Disc Contactor with a height of 6 m and a diameter of 60 mm. Up to 100 kg of ionic liquid and

  18. Photocatalytic treatment of an industrial effluent using artificial and solar UV radiation: an operational cost study on a pilot plant scale.

    Science.gov (United States)

    Durán, A; Monteagudo, J M; San Martín, I

    2012-05-15

    The aim of this work was to study the operation costs of treating a real effluent from an integrated gasification combined cycle (IGCC) power station located in Spain. The study compares different homogeneous photocatalytic processes on a pilot plant scale using different types of radiation (artificial UV or solar UV with a compound parabolic collector). The efficiency of the processes was evaluated by an analysis of the total organic carbon (TOC) removed. The following processes were considered in the study: (i) a photo-Fenton process at an artificial UV pilot plant (with the initial addition of H(2)O(2)), (ii) a modified photo-Fenton process with continuous addition of H(2)O(2) and O(2) to the system and (iii) a ferrioxalate-assisted solar photo-Fenton process at a compound parabolic collector (CPC) pilot plant. The efficiency of these processes in degrading pollutants has been studied previously, and the results obtained in each of those studies have been published elsewhere. The operational costs due to the consumption of electrical energy, reagents and catalysts were calculated from the optimal conditions of each process. The results showed that the solar photo-Fenton system was economically feasible, being able to achieve up to 75% mineralization with a total cost of 6 €/m(3), which can be reduced to 3.6 €/m(3) by subtracting the electrical costs because the IGCC plant is self-sufficient in terms of energy. Copyright © 2011 Elsevier Ltd. All rights reserved.

  19. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Britt, Phillip F [ORNL

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions based on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.

  20. Experimental results: Pilot plant calcine dissolution and liquid feed stability

    International Nuclear Information System (INIS)

    Herbst, R.S.; Fryer, D.S.; Brewer, K.N.; Johnson, C.K.; Todd, T.A.

    1995-02-01

    The dissolution of simulated Idaho Chemical Processing Plant pilot plant calcines, containing none of the radioactive actinides, lanthanides or fission products, was examined to evaluate the solubility of calcine matrix materials in acidic media. This study was a necessary precursor to dissolution and optimization experiments with actual radionuclide-containing calcines. The importance of temperature, nitric acid concentration, ratio of acid volume to calcine mass, and time on the amount, as a weight percentage of calcine dissolved, was evaluated. These parameters were studied for several representative pilot plant calcine types: (1) Run No. 74 Zirconia calcine; (2) Run No. 17 Zirconia/Sodium calcine; (3) Run No. 64 Zirconia/Sodium calcine; (3) Run No. 1027 Alumina calcine; and (4) Run No. 20 Alumina/Zirconia/Sodium calcine. Statistically designed experiments with the different pilot plant calcines indicated the effect of the studied process variables on the amount of calcine dissolved decreases in the order: Acid/Calcine Ratio > Temperature > HNO 3 Concentration > Dissolution Time. The following conditions are suitable to achieve greater than 90 wt. % dissolution of most Zr, Al, or Na blend calcines: (1) Maximum nitric acid concentration of 5M; (2) Minimum acid/calcine ratio of 10 mL acid/1 gram calcine; (3) Minimum dissolution temperature of 90 degrees C; and (4) Minimum dissolution time of 30 minutes. The formation of calcium sulphate (CaSO 4 ) precipitates was observed in certain dissolved calcine solutions during the dissolution experiments. Consequently, a study was initiated to evaluate if and under what conditions the resulting dissolved calcine solutions would be unstable with regards to precipitate formation. The results indicate that precipitate formation in the calcine solutions prepared under the above proposed dissolution conditions are not anticipated

  1. EPR pilot study on the population of Stepnogorsk city living in the vicinity of a uranium processing plant

    Energy Technology Data Exchange (ETDEWEB)

    Zhumadilov, Kassym; Akilbekov, Abdirash; Morzabayev, Aidar [L.N. Gumilyov Eurasian National University, Astana (Kazakhstan); Ivannikov, Alexander; Stepanenko, Valeriy [Medical Radiological Research Center, Obninsk (Russian Federation); Abralina, Sholpan; Sadvokasova, Lyazzat; Rakhypbekov, Tolebay [Semey State Medical University, Semey (Kazakhstan); Hoshi, Masaharu [Hiroshima University, Research Institute for Radiation Biology and Medicine, Hiroshima (Japan)

    2015-03-15

    The aim of this pilot study was to evaluate possible doses in teeth received by workers of a uranium processing plant, in excess to the natural background dose. For this, the electron paramagnetic resonance dosimetry method was applied. Absorbed doses in teeth from the workers were compared with those measured in teeth from the Stepnogorsk city population and a control pool population from Astana city. The measured tooth samples were extracted according to medical indications. In total, 32 tooth enamel samples were analyzed, 5 from Astana city, Kazakhstan (control population), 21 from the residents of Stepnogorsk city (180 km from Astana city), and 6 from the workers of a uranium processing plant. The estimated doses in tooth enamel from the uranium processing plant workers were not significantly different to those measured in enamel from the control population. In teeth from the workers, the maximum dose in excess to background dose was 33 mGy. In two teeth from residents of Stepnogorsk city, however, somewhat larger doses were measured. The results of this pilot study encourage further investigations in an effort to receiving a final conclusion on the exposure situation of the uranium processing plant workers and the residents of Stepnogorsk city. (orig.)

  2. Summary of uranium refining and conversion pilot plant at Ningyo-toge works

    International Nuclear Information System (INIS)

    Iwata, Ichiro

    1981-01-01

    In the Ningyo-toge works, Power Reactor and Nuclear Fuel Development Corp., the construction of the uranium refining and conversion pilot plant was completed, and the operation will be started after the various tests based on the related laws. As for the uranium refining in Japan, the PNC process by wet refining method has been developed since 1958. The history of the development is described. It was decided to construct the refining and conversion pilot plant with 200 t uranium/year capacity as the comprehensive result of the development. This is the amount sufficient to supply UF 6 to the uranium enrichment pilot plant in Ningyo-toge. The building for the refining and conversion pilot plant is a three-story ferro-concrete building with the total floor area of about 13,000 m 2 . The raw materials are the uranium ore produced in Ningyo-toge and the yellow cakes from abroad. Uranyl sulfate solution is obtained by solvent extraction using an extraction tower or a mixer-settler. The following processes are electrolytic reduction, precipitation of uranium tetrafluoride, filtration, drying, dehydration and UF 6 conversion. The fluorine for UF 6 conversion is produced by the facility in the plant. The operation of the pilot plant will be started in the latter half of the fiscal year 1981, the batch operation is carrried out in 1982, and the continuous operation from 1983. (Kako, I.)

  3. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  4. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  5. Prospects for pilot plants based on the tokamak, spherical tokamak and stellarator

    International Nuclear Information System (INIS)

    Menard, J.E.; Bromberg, L.; Brown, T.; Burgess, Thomas W.; Dix, D.; Gerrity, T.; Goldston, R.J.; Hawryluk, R.; Kastner, R.; Kessel, C.; Malang, S.; Minervini, J.; Neilson, G.H.; Neumeyer, C.L.; Prager, S.; Sawan, M.; Sheffield, J.; Sternlieb, A.; Waganer, L.; Whyte, D.G.; Zarnstorff, M.C.

    2011-01-01

    A potentially attractive next-step towards fusion commercialization is a pilot plant, i.e. a device ultimately capable of small net electricity production in as compact a facility as possible and in a configuration scalable to a full-size power plant. A key capability for a pilot-plant programme is the production of high neutron fluence enabling fusion nuclear science and technology (FNST) research. It is found that for physics and technology assumptions between those assumed for ITER and nth-of-a-kind fusion power plant, it is possible to provide FNST-relevant neutron wall loading in pilot devices. Thus, it may be possible to utilize a single facility to perform FNST research utilizing reactor-relevant plasma, blanket, coil and auxiliary systems and maintenance schemes while also targeting net electricity production. In this paper three configurations for a pilot plant are considered: the advanced tokamak, spherical tokamak and compact stellarator. A range of configuration issues is considered including: radial build and blanket design, magnet systems, maintenance schemes, tritium consumption and self-sufficiency, physics scenarios and a brief assessment of research needs for the configurations.

  6. Design of a uranium recovery pilot plant

    International Nuclear Information System (INIS)

    1984-01-01

    The engineering design of a pilot plant of uranium recover, is presented. The diagrams and specifications of the equipments such as pipelines, pumps, values tanks, filters, engines, etc... as well as metallic structure and architetonic design is also presented. (author)

  7. MBR pilot plant for textile wastewater treatment and reuse.

    Science.gov (United States)

    Lubello, C; Caffaz, S; Mangini, L; Santianni, D; Caretti, C

    2007-01-01

    An experimental study was carried out in order to evaluate the possibility of upgrading the conventional activated sludge WWTP of Seano (Prato, Italy) which treats municipal and textile wastewaters, by using membrane bioreactor (MBR) technology. The MBR pilot plant, set up within Seano WWTP, was fed with mixed municipal-industrial wastewaters during the first experimental period and with pure industrial wastewaters during the second. Performances and operation of the MBR were evaluated in terms of permeate characteristics and variability (COD, colour, surfactants, total N and P) and other operational parameters (sludge growth and observed yield). According to the experimental results the MBR permeate quality was always superior to the Seano WWTP one and it was suitable for industrial reuse in the textile district of the Prato area. Respirometric tests provided a modified IWA ASM1 model which fits very well the experimental data and can be used for the design and the monitoring of a full-scale MBR pilot plant.

  8. A Practical Approach for Studying Fouling Process in Li-Recovery Pilot Plant

    Science.gov (United States)

    Kong, M.; Yoon, H.; Eom, C.; Kim, B.; Chung, K.

    2011-12-01

    The efficiency of selective ion recovery such as lithium from seawater has been major interest of previous studies. However, the characterization of adsorption behavior as well as dissolution yield as discharging environmentally problematic chemical species must carefully studied in various conditions including different seawater conditions [1]. Marine biofouling communities are complex, highly dynamic ecosystems consisting of a diverse range of organisms. The development of such communities begins with bacterial attachment followed by the colonization of higher organisms such as invertebrate larvae and algal spores [2-3]. Monitoring and field studies regarding fouling problems during operation of Li-recovery pilot plant which is designed by the Korea Institute of Geoscience & Mineral Resources (KIGAM) were major concern of this study. We examined fouling process for the duration of exposure time in real marine environment. Substrated with no-antifouling treated material and antifouling treated material were exposed and tested for different behaviors toward fouling in ocean. SEM-EDS (Scanning Electron Microscope-Energy dispersive Spectroscopy) analysis was done for surface identification of specific elements for possible dissolution during seawater exposure. To identify organic compound was used GC-MS (Gas Chromatography Mass Spectrometer) analysis. Experiment results, organisms such as alga are fouled the most on 30 days and antitreated material is fouled less than non antitreated material. Operating Li-recovery pilot plant to sea, we need to consider in order to effectively and economically resolve the fouling problem. Acknowledgement : This research was supported by the national research project titled "The Development of Technology for Extraction of Resources Dissolved in Seawater" of the Korea Institute of Geoscience and Mineral Resources (KIGAM) funded by the Ministry of Land, Transport and Maritime Affairs. References [1] M. Y. Diego, K. Soren, and D. J. Kim

  9. The significance of the pilot conditioning plant (PKA) for spent fuel management

    International Nuclear Information System (INIS)

    Willax, H.O.

    1996-01-01

    The pilot conditioning plant (PKA) is intended as a multi-purpose facility and thus may serve various purposes involved in the conditioning or disposal of spent fuel elements or radwaste. Its design as a pilot plant permits development and trial of various methods and processes for fuel element conditioning, as well as for radwaste conditioning. (orig./DG) [de

  10. Verification of criticality Safety for ETRR-2 Fuel Manufacturing pilot Plant (FMPP) at Inshas

    International Nuclear Information System (INIS)

    Aziz, M.; Gadalla, A.A.; Orabi, G.

    2006-01-01

    The criticality safety of the fuel manufacturing pilot plant (FMPP) at inshas is studied and analyzed during normal and abnormal operation conditions. the multiplication factor during all stages of the manufacturing processes is determined. several accident scenarios were simulated and the criticality of these accidents were investigated. two codes are used in the analysis : MCNP 4 B code, based on monte Carlo method, and CITATION code , based on diffusion theory. the results are compared with the designer calculations and satisfactory agreement were found. the results of the study indicated that the safety of the fuel manufacturing pilot plant is confirmed

  11. Radioactive Waste Disposal Pilot Plant concept for a New Mexico site

    International Nuclear Information System (INIS)

    Weart, W.D.

    1976-01-01

    Twenty years of investigation have shown that disposal of nuclear wastes in deep salt formations is the surest means of isolating these wastes from the biosphere for the extremely long period of time required. A large scale demonstration of this capability will soon be provided by a Radioactive Waste Disposal Pilot Plant (RWDPP) to be developed in southeastern New Mexico. Initially, the pilot plant will accept only ERDA generated waste; high level waste from the commercial power reactor fuel cycle will eventually be accommodated in the pilot plant and the initial RWDPP design will be compatible with this waste form. Selection of a specific site and salt horizon will be completed in June 1976. Conceptual design of the RWDPP and assessment of its environmental impact will be completed by June 1977. Construction is expected to start in 1978 with first waste accepted in 1982. The present concept develops disposal areas for all nuclear waste types in a single salt horizon about 800 meters deep. This single level can accommodate all low level and high level waste generated in the United States through the year 2010. A major constraint on the RWDPP design is the ERDA requirement that all waste be ''readily'' retrievable during the duration of pilot plant operation

  12. Radioactive-waste isolation pilot plant

    International Nuclear Information System (INIS)

    Weart, W.D.

    1977-01-01

    The objective of the Waste Isolation Pilot Plant (WIPP) program is to demonstrate the suitability of bedded salt, specifically, the bedded salt deposits in the Los Medanos area of southeastern New Mexico, as a disposal medium for radioactive wastes. Our program responsibilities include site selection considerations, all aspects of design and development, technical guidance of facility operation, environmental impact assessment, and technical support to ERDA for developing public understanding of the facility

  13. Laboratory and pilot plant scale study on the electrochemical oxidation of landfill leachate

    International Nuclear Information System (INIS)

    Anglada, Angela; Urtiaga, Ana M.; Ortiz, Inmaculada

    2010-01-01

    Kinetic data regarding COD oxidation were measured in a laboratory scale cell and used to scale-up an electro-oxidation process for landfill leachate treatment by means of boron-doped diamond anodes. A pilot-scale reactor with a total BDD anode area of 1.05 m 2 was designed. Different electrode gaps in the laboratory and pilot plant cells resulted in dissimilar reactor hydrodynamics. Consequently, generalised dimensionless correlations concerning mass transfer were developed in order to define the mass transfer conditions in both electrochemical systems. These correlations were then used in the design equations to validate the scale-up procedure. A series of experiments with biologically pre-treated landfill leachate were done to accomplish this goal. The evolution of ammonia and COD concentration could be well predicted.

  14. Waste Isolation Pilot Plant No-migration variance petition

    International Nuclear Information System (INIS)

    1990-03-01

    This report describes various aspects of the Waste Isolation Pilot Plant (WIPP) including design data, waste characterization, dissolution features, ground water hydrology, natural resources, monitoring, general geology, and the gas generation/test program

  15. Sharing five years of pilot plant experience on aromatics extraction with ionic liquids

    NARCIS (Netherlands)

    Onink, S.A.F.; Hansmeier, A.R.; Meindersma, G.W.; Haan, de A.B.

    2011-01-01

    Since 2004 pilot plant trials have been conducted with various contactors and different ionic liquids for petrochemical model feeds as well as real refinery feeds. Our pilot plant contains several columns (rotating disc contactor, Kuhni, pulsed disc and donut column) with a height of 6 m and 5 cm

  16. Identification of Radioactive Pilot-Plant test requirements

    Energy Technology Data Exchange (ETDEWEB)

    Powell, W.J.; Riebling, E.F.

    1995-05-09

    Radioactive Pilot-Plant testing needs and alternatives are evaluated for enhanced Sludge Washing and High and Low-Level Vitrification efforts. Also investigated was instrument and equipment testing needs associated with the vitrification and retrieval process. The scope of this document is to record the existing March 1994 letter report for future use. A structured Kepner-Trego{trademark} decision analysis process was used to assist analysis of the testing needs. This analysis provided various combinations of laboratory and radioactive (hot) and cold pilot testing options associated with the above need areas. Recommendations for testing requirements were made.

  17. Identification of Radioactive Pilot-Plant test requirements

    International Nuclear Information System (INIS)

    Powell, W.J.; Riebling, E.F.

    1995-01-01

    Radioactive Pilot-Plant testing needs and alternatives are evaluated for enhanced Sludge Washing and High and Low-Level Vitrification efforts. Also investigated was instrument and equipment testing needs associated with the vitrification and retrieval process. The scope of this document is to record the existing March 1994 letter report for future use. A structured Kepner-Trego trademark decision analysis process was used to assist analysis of the testing needs. This analysis provided various combinations of laboratory and radioactive (hot) and cold pilot testing options associated with the above need areas. Recommendations for testing requirements were made

  18. Integrated bicarbonate-form ion exchange treatment and regeneration for DOC removal: Model development and pilot plant study.

    Science.gov (United States)

    Hu, Yue; Boyer, Treavor H

    2017-05-15

    The application of bicarbonate-form anion exchange resin and sodium bicarbonate salt for resin regeneration was investigated in this research is to reduce chloride ion release during treatment and the disposal burden of sodium chloride regeneration solution when using traditional chloride-form ion exchange (IX). The target contaminant in this research was dissolved organic carbon (DOC). The performance evaluation was conducted in a completely mixed flow reactor (CMFR) IX configuration. A process model that integrated treatment and regeneration was investigated based on the characteristics of configuration. The kinetic and equilibrium experiments were performed to obtain required parameters for the process model. The pilot plant tests were conducted to validate the model as well as provide practical understanding on operation. The DOC concentration predicted by the process model responded to the change of salt concentration in the solution, and showed a good agreement with pilot plant data with less than 10% difference in terms of percentage removal. Both model predictions and pilot plant tests showed over 60% DOC removal by bicarbonate-form resin for treatment and sodium bicarbonate for regeneration, which was comparable to chloride-form resin for treatment and sodium chloride for regeneration. Lastly, the DOC removal was improved by using higher salt concentration for regeneration. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Preliminary design needs for pilot plant of Monazite processing into Thorium Oxide (ThO_2)

    International Nuclear Information System (INIS)

    Hafni Lissa Nuri; Prayitno; Abdul Jami; M-Pancoko

    2014-01-01

    Data and information collection aimed in order to meet the needs of the initial design for pilot plant of monazite processing into thorium oxide (ThO_2). The content of thorium in monazite is high in Indonesia between 2.9 to 4.1% and relatively abundant in Bangka Belitung Islands. Thorium can be used as fuel because of its potential is more abundant instead of uranium. Plant of thorium oxide commercially from monazite established starting from pilot uranium. Plant of thorium oxide commercially from monazite established starting from pilot plant in order to test laboratory data. Pilot plant design started from initial design, basic design, detailed design, procurement and construction. Preliminary design needs includes data feed and products, a block diagram of the process, a description of the process, the determination of process conditions and type of major appliance has been conducted. (author)

  20. General Atomic HTGR fuel reprocessing pilot plant: results of initial sequential equipment operation

    International Nuclear Information System (INIS)

    1978-09-01

    In September 1977, the processing of 20 large high-temperature gas-cooled reactor (LHTGR) fuel elements was completed sequentially through the head-end cold pilot plant equipment. This report gives a brief description of the equipment and summarizes the results of the sequential operation of the pilot plant. 32 figures, 15 tables

  1. Encapsulation pilot plant of radioactive wastes in thermosetting resins

    International Nuclear Information System (INIS)

    1982-01-01

    The thermosetting resins (polyesters, epoxides) are used to encapsulate the low and intermediate - level radioactive wastes. The testing program concerning the drums produced by the pilot plant of the Chooz nuclear power plant is described. The installation operating is examined while thinking of the industrial application. The production costs are then evaluated

  2. Development of some operations in technological flowsheet for spent VVER fuel reprocessing at a pilot plant

    International Nuclear Information System (INIS)

    Lazarev, L.N.; Galkin, B.Ya; Lyubtsev, R.I.; Romanovskii, V.N.; Velikhov, E.P.

    1981-01-01

    The fuel reprocessing pilot plants for high active materials would permit the study and development or particular processing steps and flowsheet variations; in some cases, these experimental installations realize on a small scale practically all technological chains of large reprocessing plants. Such a fuel reprocessing pilot plant with capacity of 3 kg U/d has been built at V. G. Khlopin Radium Institute. The pilot plant is installed in the hot cell of radiochemical compartment, and is composed of the equipments for fuel element cutting and dissolving, the preparation of feed solution (clarification, correction), extraction reprocessing and the production of uranium, plutonium and neptunium concentrates, the complex processing of liquid and solid wastes and a special unit for gas purification and analysis. In the last few years, a series of experiments have been carried out on the reprocessing of spent VVER fuel. (J.P.N.)

  3. Output-Feedback Model Predictive Control of a Pasteurization Pilot Plant based on an LPV model

    Science.gov (United States)

    Karimi Pour, Fatemeh; Ocampo-Martinez, Carlos; Puig, Vicenç

    2017-01-01

    This paper presents a model predictive control (MPC) of a pasteurization pilot plant based on an LPV model. Since not all the states are measured, an observer is also designed, which allows implementing an output-feedback MPC scheme. However, the model of the plant is not completely observable when augmented with the disturbance models. In order to solve this problem, the following strategies are used: (i) the whole system is decoupled into two subsystems, (ii) an inner state-feedback controller is implemented into the MPC control scheme. A real-time example based on the pasteurization pilot plant is simulated as a case study for testing the behavior of the approaches.

  4. Experimental fact-finding in CFB biomass gasification for ECN's 500 kWth pilot-plant

    NARCIS (Netherlands)

    Kersten, Sascha R.A.; Prins, W.; van der Drift, A.; van Swaaij, Willibrordus Petrus Maria

    2003-01-01

    CFB biomass gasification has been studied by experimentation with ECN's pilot facility and a cold-flow model of this plant. Data obtained by normal operation of this plant and the results of some special experiments have provided new insight into the behavior of circulating fluidized bed reactors

  5. Pilot plant for hydrogasification of coal with nuclear heat

    International Nuclear Information System (INIS)

    Falkenhain, G.; Velling, G.

    1976-01-01

    In the framework of a research and development programme sponsored by the Ministry of Research and Technology of the Federal Republic of Germany, two process variants for hydrogasification of coal by means of nuclear heat have been developed by the Rheinische Braunkohlenwerke AG, Cologne. For testing these process variants a semi-technical pilot plant for gasification of coal under pressure in a fluidized bed was constructed. The pilot plant, in which the gasification of lignite and hard coal is planned, is designed for a throughput of 100kg carbon per hour corresponding to 400kg raw lignite per hour or 150kg hard coal per hour. The plant should provide data on the influence of the most essential process parameters (pressure, temperature, residence time of gas and coal, type and pre-treatment of feed coal) on the performance of gasification and raw gas composition. Different plant components will also be tested. Since the pilot plant will permit testing of both process variants of hydrogasification, it was designed in such a way that it is possible to vary a great number of process parameters. Thus, for instance, the pressure can be chosen in a range up to 100 bar and pure hydrogen or mixtures of hydrogen, carbon monoxide and steam can be applied as gasification agents. The gasifier is an internally insulated fluidized bed reactor with an inner diameter of 200mm and a height of about 8m, to which an internally insulated cyclone for separation of the entrained fines is attached. The raw gas is then cooled down by direct water scrubbing. (author)

  6. Raft River binary-cycle geothermal pilot power plant final report

    Energy Technology Data Exchange (ETDEWEB)

    Bliem, C.J.; Walrath, L.F.

    1983-04-01

    The design and performance of a 5-MW(e) binary-cycle pilot power plant that used a moderate-temperature hydrothermal resource, with isobutane as a working fluid, are examined. Operating problems experienced and solutions found are discussed and recommendations are made for improvements to future power plant designs. The plant and individual systems are analyzed for design specification versus actual performance figures.

  7. Development of the Risk-Based Inspection Techniques and Pilot Plant Activities

    International Nuclear Information System (INIS)

    Phillips, J.H.

    1997-01-01

    Risk-based techniques have been developed for commercial nuclear power plants. System boundaries and success criteria is defined using the probabilistic risk analysis or probabilistic safety analysis developed to meet the individual plant evaluation. Final ranking of components is by a plant expert panel similar to the one developed for maintenance rule. Components are identified as being high risk-significant or low-risk significant. Maintenance and resources are focused on those components that have the highest risk-significance. The techniques have been developed and applied at a number of pilot plants. Results from the first risk-based inspection pilot plant indicates that safety due to pipe failure can be doubled while the inspection reduced to about 80% when compared with current inspection programs. The reduction in inspection reduces the person-rem exposure resulting in further increases in safety. These techniques have been documented in publication by the ASME CRTD

  8. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  9. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  10. Continuous precipitation of uranium peroxide in process pilot plant

    International Nuclear Information System (INIS)

    Quinelato, A.L.

    1990-01-01

    An experimental study on uranium peroxide precipitation has been carried out with the objective to evaluate the influence of the main process parameters with a technological approach. The uraniferous solution used was obtained from the hydrometallurgical processing of an ore from Itataia - CE. Studies were developed in two distinct experimental stages. In the first stage, the precipitation was investigated by means of laboratory batch tests and, in the second stage, by means of continuous operation in a process pilot plant. (author)

  11. Strategic pilot for operator support system in nuclear power plant - design considerations

    International Nuclear Information System (INIS)

    Bucur, I.; Tatar, F.

    1999-01-01

    In order to improve the plant operational safety the development of an Operator Support System (OSS) is required. This system is intended to process data from nuclear systems and to provide adequate outputs to the plant operation staff. Before implementing this system, a strategic pilot should be produced as a demonstration of the technology. The strategic pilot could be considered as a means of building both skills and credibility in development and implementation of OSS. In any organization this project should be under plant management control with operation group involvement. This paper describes the managerial tasks that should be carried out to define, build and implement such a module. The main objectives, the functional requirements and the benefits of pilot implementation are revealed. Furthermore, the problem relating to the background at CNE-PROD Cernavoda is analyzed and the present achievements are pointed out. (authors)

  12. A Study on SE Methodology for Design of Big Data Pilot Platform to Improve Nuclear Power Plant Safety

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Junguk; Cha, Jae-Min; Kim, Jun-Young; Park, Sung-Ho; Yeom, Choong-Sub [Institute for Advanced Engineering (IAE), Yongin (Korea, Republic of)

    2016-10-15

    A big data concept is expected to have a large impact on the safety of the nuclear power plant (NPP) from the beginning of the big data era. Though there are high interests on the NPP safety with the big data, almost no studies on the logical and physical structures and the systematic design methods of the big data platform for the NPP safety have been conducted. For the current study, a new big data pilot platform for the NPP safety is designed with the main focus on the health monitoring and early warning systems, and a tailored design process based on the systems engineering approaches is proposed to manage inherent high complexity of the platform design. The big data concept is expected to have a large impact on the safety of the NPP. So, in this study, the big data pilot platform for the health monitoring and early warning of the NPP is designed. For this, the development process based on the SE approach for the pilot platform is proposed and the design results along with the proposed process are also presented. Implementation of the individual modules and integrations of those are in currently progress.

  13. A Study on SE Methodology for Design of Big Data Pilot Platform to Improve Nuclear Power Plant Safety

    International Nuclear Information System (INIS)

    Shin, Junguk; Cha, Jae-Min; Kim, Jun-Young; Park, Sung-Ho; Yeom, Choong-Sub

    2016-01-01

    A big data concept is expected to have a large impact on the safety of the nuclear power plant (NPP) from the beginning of the big data era. Though there are high interests on the NPP safety with the big data, almost no studies on the logical and physical structures and the systematic design methods of the big data platform for the NPP safety have been conducted. For the current study, a new big data pilot platform for the NPP safety is designed with the main focus on the health monitoring and early warning systems, and a tailored design process based on the systems engineering approaches is proposed to manage inherent high complexity of the platform design. The big data concept is expected to have a large impact on the safety of the NPP. So, in this study, the big data pilot platform for the health monitoring and early warning of the NPP is designed. For this, the development process based on the SE approach for the pilot platform is proposed and the design results along with the proposed process are also presented. Implementation of the individual modules and integrations of those are in currently progress

  14. Tetrafluoride uranium pilot plant in operation at IEA, using the moving bed process

    International Nuclear Information System (INIS)

    Franca Junior, J.M.

    1975-01-01

    A UF 4 pilot plant, in operation at IEA, using the moving bed process is reported. UO 3 obtained from the thermal decomposition of ADU is used as a starting material in this pilot plant. The type of equipment and the process are both described. Ammonia gas (NH 3 ) was used in the reduction operation and anhydrous hydrofluoric acid (HF) in the hydrofluorination step

  15. Simulation studies of the influence of HCl absorption on the performance of a wet flue gas desulphurisation pilot plant

    DEFF Research Database (Denmark)

    Kiil, Søren; Nygaard, Helle; Johnsson, Jan Erik

    2002-01-01

    The mathematical model of Kiil et al, (Ind. Eng, Chem. Res. 37 (1998) 2792) for a wet flue gas desulphurisation (FGD) pilot plant was extended to include the simultaneous absorption of HCl. In contrast to earlier models for wet FGD plants, the inclusion of population balance equations...

  16. Pilot Study for Maintenance Rule at KSNP

    International Nuclear Information System (INIS)

    Choi, Kwang Hee; Jeong, Hyeon Jong; Jee, Moon Hak; Hong, Sung Yull

    2005-01-01

    Maintenance Rule (MR), which was developed to monitor the effectiveness of maintenance in a nuclear power plant (NPP), has been received as highly successful program by and large since its implementation in 1996 in the United States. Korea has initiated two pilot programs to implement the Maintenance Rule program in 2003. Selected plants for the pilot implementation are Kori 3 and 4 units and Ulchin 3 and 4 units, where Kori 3 and 4 units are Westinghouse units and Ulchin 3 and 4 units are Korean Standardized Nuclear Power (KSNP) Plant units. This paper describes the results of each key tasks completed to date and insights gained from pilot study on the KSNP units. Currently, Scoping of the functions of maintenance rule and determination of safety significance level have been completed during first year. As first task, total 607 functions were identified and defined by detailed function analysis on 135 systems that cover all plant systems. About 55% of total functions are selected as within the scope of maintenance rule. Among these inscoped functions, 56% of scoped functions are safety related and 44% are non-safety related functions. Evaluation of safety significance for each function was determined by expert panel consist of eight experts in field of plant maintenance, operation, PSA, work schedule and system engineers. As a result, about 46% of functions were determined to be high safety significant functions and rest of the functions were classified as low safety significant. The remaining tasks that are included determination of performance criteria and preparation of implementing guideline will be performed in following years

  17. The Marcoule pilot plant

    International Nuclear Information System (INIS)

    Faugeras, P.; Calame Longjean, A.; Le Bouhellec, J.; Revol, G.

    1986-06-01

    The Marcoule spent fuel reprocessing pilot facility was built in 1960-1961 for extended testing of the PUREX process with various types of fuel under conditions similar to those encountered in a production plant. Extensive modification work was undertaken on the facility in 1983 in the scope of the TOR project, designed with the following objectives: - increase the throughput capacity to at least 5 metric tons of PHENIX equivalent fuel per year, - extend equipment and process R and D capability, - improve job safety by maximum use of remote handling facilities, - maximize waste conditioning treatments to produce waste forms suitable for direct storage, - provide a true industrial process demonstration in continuous operation under centralized control using computerized procedures. The redesigned plant is scheduled to begin operation during the second half of 1986. The proximity of the Industrial Prototypes Service and the ATALANTE radiochemical research laboratory scheduled to begin operation in 1990, will provide a synergistic environment in which R and D program may be carried out under exceptional conditions

  18. A pilot plant for removing chromium from residual water of tanneries.

    Science.gov (United States)

    Landgrave, J

    1995-02-01

    The purpose of this study is to develop a technical process for removing trivalent chromium from tannery wastewater via precipitation. This process can be considered an alternative that avoids a remediation procedure against the metal presence in industrial wastes. This process was verified in a treatment pilot plant located in León, México handling 10 m3/day of three types of effluents. The effluent streams were separated to facilitate the elimination of pollutants from each one. The process was based on in situ treatment and recycle to reduce problems associated with transportation and confinement of contaminated sludges. Two types of treatment were carried out in the pilot plant: The physical/chemical and biological treatments. Thirty-five experiments were conducted and the studied variables were the pH, type of flocculant, and its dose. The statistical significance of chromium samples was 94.7% for its precipitation and 99.7% for recovery. The objectives established for this phase of the development were accomplished and the overall efficiencies were measured for each stage in the pilot plant. The results were: a) chromium precipitation 99.5% from wastewater stream, b) chromium recovery 99% for recycling, and c) physical/chemical treatment to eliminate grease and fat at least 85% and 65 to 70% for the biological treatment. The tanning of a hide lot (350 pieces) was accomplished using 60% treated and recycled water without affecting the product quality. The recovered chromium liquor was also used in this hide tanning. This technical procedure is also applicable for removing heavy metals in other industrial sectors as well as in reducing water consumption rates, if pertinent adjustments are implemented.

  19. Waste Isolation Pilot Plant Safety Analysis Report. Volume 5

    International Nuclear Information System (INIS)

    1986-01-01

    This Safety Analysis Report (SAR) has been prepared by the US Department of Energy (DOE) to support the construction and operation of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP facility is designed to receive, inspect, emplace, and store unclassified defense-generated transuranic wastes in a retrievable fashion in an underground salt medium and to conduct studies and perform experiments in salt with high-level wastes. Upon the successful completion of these studies and experiments, WIPP is designed to serve as a permanent facility. The first chapter of this report provides a summary of the location and major design features of WIPP. Chapters 2 through 5 describe the site characteristics, design criteria, and design bases used in the design of the plant and the plant operations. Chapter 6 discusses radiation protection; Chapters 7 and 8 present an accident analysis of the plant and an assessment of the long-term waste isolation at WIPP. The conduct of operations and operating controls and limits are discussed in Chapters 9 and 10. The quality assurance programs are described in Chapter 11

  20. Waste Isolation Pilot Plant Safety Analysis Report. Volume 4

    International Nuclear Information System (INIS)

    1986-01-01

    This Safety Analysis Report (SAR) has been prepared by the US Department of Energy (DOE) to support the construction and operation of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP facility is designed to receive, inspect, emplace, and store unclassified defense-generated transuranic wastes in a retrievable fashion in an underground salt medium and to conduct studies and perform experiments in salt with high-level wastes. Upon the successful completion of these studies and experiments, WIPP is designed to serve as a permanent facility. The first chapter of this report provides a summary of the location and major design features of WIPP. Chapters 2 through 5 describe the site characteristics, design criteria, and design bases used in the design of the plant and the plant operations. Chapter 6 discusses radiation protection; Chapters 7 and 8 present an accident analysis of the plant and an assessment of the long-term waste isolation at WIPP. The conduct of operations and operating controls and limits are discussed in Chapters 9 and 10. The quality assurance programs are described in Chapter 11

  1. Waste Isolation Pilot Plant Safety Analysis Report. Volume 1

    International Nuclear Information System (INIS)

    1986-01-01

    This Safety Analysis Report (SAR) has been prepared by the US Department of Energy (DOE) to support the construction and operation of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP facility is designed to receive, inspect, emplace, and store unclassified defense-generated transuranic wastes in a retrievable fashion in an underground salt medium and to conduct studies and perform experiments in salt with high-level wastes. Upon the successful completion of these studies and experiments, WIPP is designed to serve as a permanent facility. The first chapter of this report provides a summary of the location and major design features of WIPP. Chapters 2 through 5 describe the site characteristics, design criteria, and design bases used in the design of the plant and the plant operations. Chapter 6 discusses radiation protection: Chapters 7 and 8 present an accident analysis of the plant and an assessment of the long-term waste isolation at WIPP. The conduct of operations and operating control and limits are discussed in Chapters 9 and 10. The quality assurance programs are described in Chapter 11

  2. Waste Isolation Pilot Plant Safety Analysis Report. Volume 2

    International Nuclear Information System (INIS)

    1986-01-01

    This Safety Analysis Report (SAR) has been prepared by the US Department of Energy (DOE) to support the construction and operation of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP facility is designed to receive, inspect, emplace, and store unclassified defense-generated transuranic wastes in a retrievable fashion in an underground salt medium and to conduct studies and perform experiments in salt with high-level wastes. Upon the successful completion of these studies and experiments, WIPP is designed to serve as a permanent facility. The first chapter of this report provides a summary of the location and major design features of WIPP. Chapters 2 through 5 describe the site characteristics, design criteria, and design bases used in the design of the plant and the plant operations. Chapter 6 discusses radiation protection; Chapters 7 and 8 present an accident analysis of the plant and an assessment of the long-term waste isolation at WIPP. The conduct of operations and operating controls and limits are discussed in Chapters 9 and 10. The quality assurance programs are described in Chapter 11

  3. Waste Isolation Pilot Plant 2001 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions, Inc.

    2002-09-20

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

  4. Waste Isolation Pilot Plant 2001 Site Environmental Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions, Inc.

    2002-01-01

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment

  5. Waste Isolation Pilot Plant 1999 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, Roy B.; Adams, Amy; Martin, Don; Morris, Randall C.; Reynolds, Timothy D.; Warren, Ronald W.

    2000-09-30

    The U.S. Department of Energy's (DOE)Carlsbad Area Office and the Westinghouse Waste Isolation Division (WID) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 1999 Site Environmental Report summarizes environmental data from calendar year 1999 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during calendar year 1999. WIPP received its first shipment of waste on March 26, 1999. In 1999, no evidence was found of any adverse effects from WIPP on the surrounding environment. Radionuclide concentrations in the environment surrounding WIPP were not statistically higher in 1999 than in 1998.

  6. Two treatment methods for stormwater sediments--pilot plant and landfarming--and reuse of the treated sediments in civil engineering.

    Science.gov (United States)

    Petavy, F; Ruban, V; Conil, P; Viau, J Y; Auriol, J C

    2009-07-01

    The aim of this research was to present a pilot plant for the treatment of stormwater sediments and to compare the decontamination rate to that obtained by landfarming. The possibilities for reuse of the treated sediments in civil engineering are also studied. Four sediments from retention/infiltration ponds or from street sweeping were studied. In each case organic matter (OM), total hydrocarbons (TH) and polycyclic aromatic hydrocarbons (PAH) were measured. Geotechnical tests were carried out to evaluate the reuse possibilities of the treated sediments. Treatment by means of the pilot plant was efficient at reducing TH and PAH concentrations: THs were reduced by 53-97% and PAHs were decreased by 60-95%. By comparison, a reduction of 45-75% in TH concentration is obtained with landfarming, whereas there is no significant decrease in PAHs. Furthermore, geotechnical tests showed that the treated fractions from the pilot plant can be reused as road embankments and as a capping layer. These results are most encouraging and show that stormwater sediments can valuably be reused after treatment in a pilot plant. Landfarming is less efficient but this technique could be used as a pretreatment in the case of high TH pollution.

  7. Use of phosphorus release batch tests for modelling an EBPR pilot plant

    DEFF Research Database (Denmark)

    Tykesson, E.; Aspegren, H.; Henze, Mogens

    2002-01-01

    The aim of this study was to evaluate how routinely performed phosphorus release tests could be used when modelling enhanced biological phosphorus removal (EBPR) using activated sludge models such as ASM2d. A pilot plant with an extensive analysis programme was used as basis for the simulations...

  8. Integrated automation system for a pilot plant for energy conversion using PEMFCs

    International Nuclear Information System (INIS)

    Culcer, Mihai; Iliescu, Mariana; Raceanu, Mircea; Stanciu, Vasile; Stefanescu, Ioan; Enache, Adrian; Lazaro, Pavel Gabriel; Lazaroiu, Gheorghe; Badea, Adrian

    2007-01-01

    Based on Hydrogen and Fuel Cells researches and technological capabilities achieved in the National R and D Programs, ICIT Rm. Valcea built an experimental-demonstrative pilot plant for energy conversion using hydrogen PEMFCs. This pilot plant consists of a fuel processor based on steam methane reforming (SMR) process, a hydrogen purification unit, a PEM fuel cells stack (FCS) and a power electronics unit. The paper deals with the dedicated controlling system that provides automated data acquisition, manual or on-line operational control, gas management, humidification, temperature and flow controls. (authors)

  9. A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

    Energy Technology Data Exchange (ETDEWEB)

    BLanc, Katya Le [Idaho National Lab. (INL), Idaho Falls, ID (United States); Powers, David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Spielman, Zachary [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rice, Brandon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Fitzgerald, Kirk [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-08-01

    Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.

  10. Italian experience with pilot reprocessing plants

    International Nuclear Information System (INIS)

    Cao, S.; Dworschak, H.; Rolandi, G.; Simonetta, R.

    1977-01-01

    Problems and difficulties recently experienced in the reprocessing technology of high burnup power reactor fuel elements have shown the importance of pilot plant experiments to optimize the separation processes and to test advanced equipment on a representative scale. The CNEN Eurex plant, in Saluggia (Vercelli), with a 50 kg/d thruput, in operation since '71, has completed several reprocessing campaigns on MTR type fuel elements. Two different chemical flowsheets based respectively on TBP and tertiary amines were thoroughly tested and compared: a concise comparative evaluation of the results obtained with the two schemes is given. Extensive modifications have then been introduced (namely a new headend cell equipped with a shear) to make the plant suitable to reprocess power reactor fuels. The experimental program of the plant includes a joint CNEN-AECL reprocessing experiment on CANDU (Pickering) type fuel elements to demonstrate a two cycle, amine based recovery of the plutonium. Later, a stock of high burnup fuel elements from the PWR Trino power station will be reprocessed to recover Pu and U with a Purex type flowsheet. ITREC, the second CNEN experimental reprocessing plant located at Trisaia Nuclear Center (Matera), started active operation two years ago. In the first campaign Th-U mixed oxide fuel elements irradiated in the Elk River reactor were processed. Results of this experiment are reported. ITREC special design features confer a high degree of versability to the plant allowing for substantial equipment modification under remote control conditions. For this reason the plant will be principally devoted in the near future to advanced equipment testing. Along this line high speed centrifugal contactor of a new type developed in Poland will be tested in the plant in the frame of a joint experiment between CNEN and the Polish AEC. Later on the plant program will include experimental campaign on fast reactor fuels; a detailed study on this program is in

  11. Technical Proposal Salton Sea Geothermal Power Pilot Plant Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-03-28

    The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and

  12. Pilot-scale Biogas Plant for the Research and Development of New Technologies

    Directory of Open Access Journals (Sweden)

    Ivan Simeonov

    2012-09-01

    Full Text Available Тhe paper describes a new pilot-scale biogas plant of the Institute of Microbiology - Bulgarian Academy of Sciences. The equipment includes: a 100 L pilot bioreactor, a 200 L metal gasholder, sensors, actuators, a two-level automatic process monitoring and control system, a fire and explosion protection system and two web cameras. The monitoring and control system is composed on the lower level of a controller Beckhoff, and on the higher level - of a PC with specialized software (under development. The pilot biogas plant is designed to work out and scale up various anaerobic digestion (AD technologies based on different types of feedstock. All the data will be stored on the PC for quick reference and possibly data mining, parameter identification and verification of different AD mathematical models.

  13. A pilot study for the extraction and treatment of groundwater from a manufactured gas plant site. Final report

    International Nuclear Information System (INIS)

    1997-12-01

    This report describes a pilot study involving treatment of contaminated groundwater at a former manufactured gas plant site on the eastern seaboard of the US. The work was performed in order to provide the design basis for a full-scale groundwater extraction and treatment system at the site, as well as to develop a generic approach to selection of groundwater treatment sequences at other MGP sites. It included three main components: hydrogeologic investigations, bench-scale treatability studies, and pilot-scale treatability studies. Technologies evaluated in bench-scale work included gravity settling, filtration, and dissolved air flotation (DAF) for primary treatment of nonaqueous phase materials; biological degradation, air stripping, and carbon adsorption for secondary treatment of dissolved organics; and carbon adsorption as tertiary treatment of remaining dissolved contaminants. Pilot-scale studies focused on collecting system performance data fore three distinct levels of contamination. Two treatment trains were evaluated. One consisted of DAF, fluidized-bed biotreatment, and filtration plus carbon adsorption; the other used the same steps except to substitute air stripping for fluidized bed treatment. The final effluents produced by both treatment sequences were similar and demonstrated complete treatment of the groundwater. Besides detailing system design and performance for the treatability studies, the report includes an analysis of groundwater treatment applications to MGP sites in general, including a discussion of capital and operating costs

  14. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, fabrication/installation work, etc. were made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. Construction work of a pilot plant of coal gasification power generation was at its peak in April 1990, and installation/piping work for each facility/equipment was carried out. In May, transportation/installation of gas turbine and generator were started. In June, installation of equipment of the 66kV special high voltage switching station was conducted, and the initial power receiving of 6.9kV was conducted. In August, inspection before use was made of the main piping of the gasifier equipment, gas refining equipment and gas turbine equipment. In December, trial unit operation of each equipment and interlock test were carried out. 'The integrated plant protection interlock test' was made from January 21 to February 21, 1991, and the favorable results were obtained. On February 28, a ceremony to celebrate the completion of all facilities of pilot plant was made. In March, drying of gasifier and initial firing by light oil were conducted, and all the work was completed on March 25. (NEDO)

  15. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, fabrication/installation work, etc. were made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. Construction work of a pilot plant of coal gasification power generation was at its peak in April 1990, and installation/piping work for each facility/equipment was carried out. In May, transportation/installation of gas turbine and generator were started. In June, installation of equipment of the 66kV special high voltage switching station was conducted, and the initial power receiving of 6.9kV was conducted. In August, inspection before use was made of the main piping of the gasifier equipment, gas refining equipment and gas turbine equipment. In December, trial unit operation of each equipment and interlock test were carried out. 'The integrated plant protection interlock test' was made from January 21 to February 21, 1991, and the favorable results were obtained. On February 28, a ceremony to celebrate the completion of all facilities of pilot plant was made. In March, drying of gasifier and initial firing by light oil were conducted, and all the work was completed on March 25. (NEDO)

  16. Prototype plant for nuclear process heat (PNP) - operation of the pilot plant for hydrogasification of coal

    International Nuclear Information System (INIS)

    Bruengel, N.; Dehms, G.; Fiedler, P.; Gerigk, H.P.; Ruddeck, W.; Schrader, L.; Schumacher, H.J.

    1988-04-01

    The Rheinische Braunkohlenwerke AG developed the process of hydrogasification of coal in a fluidized bed for generation of SNG. On basis of test results obtained in a semi-technical pilot plant of a through-put of 250 kg/h dried coal a large pilot plant was erected processing 10 t/h dried brown coal. This plant was on stream for about 14700 h, of which about 7800 h were with gasifier operation; during this time about 38000 t of dried brown coal of the Rhenish district were processed containing 4 to 25% of ash. At pressures of 60 to 120 bar and temperatures of 800 to 935 0 C carbon conversion rates up to 81 percent and methane amounts of 5000 m 3 (STP)/h were reached. The decisive parameter for methane generation was the hydrogen/coal-ratio. Even at high moisture contents, usually diminishing the methane yield from the coal essentially, by high hydrogen/coal-ratios high methane yields could be obtained. The gasifier itself caused no troubles during the total time operation. Difficulties with the original design of the residual char cooler could be overcome by change-over from water injection to liquid carbon dioxide. The design of the heat recovery system proved well. Alltogether so the size increasement of the gasifier from the semi-technical to the large pilot plant as well as the harmonization of gas generation and gas refining was proved. (orig.) With 20 refs., 20 tabs., 81 figs [de

  17. Double stage dry-wet-fermentation - start-up of a pilot biogas plant

    International Nuclear Information System (INIS)

    Buschmann, Jeannette; Busch, Gunter; Burkhardt, Marko

    2009-01-01

    The Brandenburg University of Technology (BTU) has developed a double stage dry-wet fermentation process for fast and safe anaerobic degradation. Originally designed for treatment of organic wastes, this process allows using a wide variety of solid biodegradable materials. The dividing of hydrolysis and methanation in this process, allows an optimization of the different steps of biogas generation separately. The main advantages of the process are the optimum process control, an extremely stable process operation and a high gas productivity and quality. Compared to conventional processes, the retention times within the percolation stage (hydrolysis) are reduced considerably. In cooperation with the engineering and consulting company GICON, the technology was qualified further to an industrial scale. In 2007 a pilot plant, and, simultaneously, an industrial plant were built by GICON based on this double stage technology. Based on practical experience from the operation of laboratory fermentation plants, the commissioning of the pilot plant was planned, controlled and monitored by our institution. The start-up of a biogas plant of this type focuses mainly on the inoculation the of methane reactor. The growth of microbial populations and generation of a stable biocenosis within the methane reactor is essential and affects the duration of starting period as well as the methanation efficiency a long time afterwards. This paper concerns with start-up of a pilot biogas plant and discusses particular occurrences and effects during this period. (author)

  18. Operation result of 40kW class MCFC pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Saitoh, H.; Hatori, S.; Hosaka, M.; Uematsu, H. [Ishikawajima-Harima Heavy Industries Co., Ltd., Tokyo (Japan)

    1996-12-31

    Ishikawajima-Harima Heavy Industries Co., Ltd. developed unique Molten Carbonate Fuel Cell (MCFC) system based on our original concept. To demonstrate the possibility of this system, based on MCFC technology of consigned research from New Energy and Industrial Technology Development Organization (NEDO) in Japan, we designed 40kW class MCFC pilot plant which had all equipments required as a power plant and constructed in our TO-2 Technical Center. This paper presents the test results of the plant.

  19. The working of RVNRL pilot plant of Rubber Board and it's safety devices

    International Nuclear Information System (INIS)

    Britto, I.J.; Thomas, E.V.

    1996-01-01

    A pilot plant for producing radiation vulcanized natural rubber latex (RVNRL) was established at Rubber Board, India in 1992. Irradiation is done by a batch process in the plant. The plant has a versatile safety system for safety of operators and people working in and around the plant

  20. Waste Isolation Pilot Plant Technical Assessment Team Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-03-17

    This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

  1. Pilot plant production at Riso of LEU silicide fuel for the Danish reactor DR3

    International Nuclear Information System (INIS)

    Toft, P.; Borring, J.; Adolph, E.

    1988-01-01

    A pilot plant for fabricating LEU silicide fuel elements has been established at Riso National Laboratory. Three test elements for the Danish reactor DR3 have been fabricated, based on 19.88% enriched U 3 Si 2 powder that has been purchased elsewhere. The pilot plant has been set up and 3 test elements fabricated without any major difficulties

  2. The underground main fan study at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    McDaniel, K.H.; Chmura, K.M.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) performed a feasibility analysis for the purpose of either modifying, supplementing, or replacing its two main mine fans. The WIPP, located near Carlsbad, New Mexico, is a US Department of Energy (DOE) facility designed to demonstrate the permanent, safe disposal of US defense-generated transuranic waste in a deep bedded salt deposit. Since the centrifugal fans were installed in 1988, multiple operational and performance concerns have been identified. A comprehensive engineering study was conducted in 1995 to: (1) qualify and quantify operational concerns; (2) evaluate possible alternatives; and (3) recommend an optimum solution. Multiple system modification and/or replacement scenarios were evaluated with associated cost estimates developed. The study considered replacement with either centrifugal or axial fans. Multiple fan duties are required at the WIPP. Therefore, Variable Frequency Drives and Inlet Vane Controls (IVC) were investigated for centrifugal fans. In-flight adjustable blades were investigated for axial fans. The study indicated that replacing the existing system with two double-width, double-inlet centrifugal fans equipped with IVCs was the best choice. This alternative provided the most desirable combination of: (1) ensuring the required operational readiness, and (2) improving system performance. The WIPP is currently planning to replace the first fan in 1997

  3. Deep shaft high rate aerobic digestion: laboratory and pilot plant performance

    Energy Technology Data Exchange (ETDEWEB)

    Tran, F; Gannon, D

    1981-01-01

    The Deep Shaft is essentially an air-lift reactor, sunk deep in the ground (100-160 m); the resulting high hydrostatic pressure together with very efficient mixing in the shaft provide extremely high O transfer efficiencies (O.T.E.) of less than or equal to 90% vs. 4-20% in other aerators. This high O.T.E. suggests real potential for Deep-Shaft technology in the aerobic digestion of sludges and animal wastes: with conventional aerobic digesters an O.T.E. over 8% is extremely difficult to achieve. Laboratory and pilot plant Deep-Shaft aerobic digester studies carried out at Eco-Research's Pointe Claire, Quebec laboratories, and at the Paris, Ontario pilot Deep-Shaft digester are described.

  4. TASK 3: PILOT PLANT GASIFIER TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Fusselman, Steve

    2015-11-01

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions

  5. 10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-25

    Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)

  6. Report on the results of the R and D of a 200 t/d entrained bed coal gasification pilot plant. Summary - Part 1. Volume 1: Outline of the R and D/Volume 2: Outline of the details of execution of the R and D/Investigational study of verification plant; 1986- 200t/nichi funryusho sekitan gaska hatsuden pilot plant no kenkyu seika hokokusho (Matome). Sono 1. Dai 1 hen kenkyu kaihatsu no gaiyo, Dai 2 hen kenkyu kaihatsu jisshi keii no gaiyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    A project was finished which had been carried out for 11 years since 1986 for technology of the entrained bed coal gasification power generation technology using a 200 t/d coal gasification combined cycle power generation pilot plant, and it was comprehensively summed up. In Volume 1: Outline of the R and D, the following were summarized: object and background, details of selection of the basic system, objectives and subjects of the R and D, developmental items of 200 t/d pilot plant, outline of pilot plant, place of execution of the R and D and system of the R and D, response to procedures for approval from government offices, etc. In Volume 2: Outline of the details of execution of the R and D, state of design/manufacture/construction, state of operational study, state of dismantling study, important notice at the time of design of pilot plant and the evaluation, outline of the execution of element study, outline of the details of the studies made public overseas. In Investigational study of verification plant, the basic viewpoint of conceptual design, conditions for conceptual design/basic design, outline of the results of the study every fiscal year, finally obtained results of the conceptual design, points to be considered in the design of verification plant, etc. (NEDO)

  7. 1974 conceptual design description of a bedded salt pilot plant in southeast New Mexico

    International Nuclear Information System (INIS)

    1977-06-01

    The policy of the United States Atomic Energy Commission is to take custody of all commercial high-level radioactive wastes and maintain control of them in perpetuity. This policy (Title 10, Code of Federal Regulations, Part 50, Appendix F) requires that the high-level wastes from nuclear fuels reprocessing plants be solidified within five years after reprocessing and then shipped to a federal repository within ten years after reprocessing. Ultimate disposal sites and/or methods have not yet been selected and are not expected to be ready when waste deliveries begin about 1983. Therefore, the AEC plans to build an interim storage facility, called Retrievable Surface Storage Facility (RSSF), to store and isolate the waste from man and his environment until the suitability of the permanent repository is demonstrated and public acceptance has been established. Meantime, the AEC is proceeding with the study and development of an ultimate disposal method. Bedded salt is being considered for ultimate waste disposal, and work is in progress to develop a Bedded Salt Pilot Plant to demonstrate its acceptability. The pilot plant will permit in situ verification of laboratory work on the interaction of heat and radioactivity of the waste with the salt and surroundings. One concept of such a pilot facility is described

  8. Geothermal pilot study final report: creating an international geothermal energy community

    Energy Technology Data Exchange (ETDEWEB)

    Bresee, J.C.; Yen, W.W.S.; Metzler, J.E. (eds.)

    1978-06-01

    The Geothermal Pilot Study under the auspices of the Committee on the Challenges of Modern Society (CCMS) was established in 1973 to apply an action-oriented approach to international geothermal research and development, taking advantage of the established channels of governmental communication provided by the North Atlantic Treaty Organization (NATO). The Pilot Study was composed of five substudies. They included: computer-based information systems; direct application of geothermal energy; reservoir assessment; small geothermal power plants; and hot dry rock concepts. The most significant overall result of the CCMS Geothermal Pilot Study, which is now complete, is the establishment of an identifiable community of geothermal experts in a dozen or more countries active in development programs. Specific accomplishments include the creation of an international computer file of technical information on geothermal wells and fields, the development of studies and reports on direct applications, geothermal fluid injection and small power plants, and the operation of the visiting scientist program. In the United States, the computer file has aready proven useful in the development of reservoir models and of chemical geothermometers. The state-of-the-art report on direct uses of geothermal energy is proving to be a valuable resource document for laypersons and experts in an area of increasing interest to many countries. Geothermal fluid injection studies in El Salvador, New Zealand, and the United States have been assisted by the Reservoir Assessment Substudy and have led to long-range reservoir engineering studies in Mexico. At least seven small geothermal power plants are in use or have been planned for construction around the world since the Small Power Plant Substudy was instituted--at least partial credit for this increased application can be assigned to the CCMS Geothermal Pilot Study. (JGB)

  9. The design of a continuous ion-exchange pilot plant for the recovery of uranium from partially clarified solutions

    International Nuclear Information System (INIS)

    Cloete, F.L.D.

    1980-01-01

    A preliminary design is given for a pilot plant to recover uranium from partially clarified slime pulp by continuous ion exchange. Process and plant-design methods are indicated briefly, and an outline is given of experimental work that should be undertaken before the start-up of the pilot plant

  10. Vitrification of plutonium at Rocky Flats the argument for a pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Moore, L. [Rocky Mountain Peace Center, Boulder, CO (United States)

    1996-05-01

    Current plans for stabilizing and storing the plutonium at Rocky Flats Plant fail to put the material in a form suitable for disposition and resistant to proliferation. Vitrification should be considered as an alternate technology. The vitrification should begin with a small-scale pilot plant.

  11. Radiation effects-prevalence of contributory risk factors a pilot study in Visakhapthnam steel plant

    International Nuclear Information System (INIS)

    Lakshman rao, K. V.

    2004-01-01

    Integrated Steel Plants contribute significant air pollution, water pollution and solid waste generation. Diverse occupational health hazards present is steel industry pose ill effects to the industrial workers. Occupational health services and research center (OHS and RC) of this plant established in the year 1992 to protect the health and well-being of all the employees working in different occupations. the primary role OHS and RC is to conduct periodical medical examinations, monitoring of the working environments, suggest the suitable personal protective equipment to the workers, evaluate risk factors, work practices, risk management and industrial toxicological studies. Dissemination of information related to occupational health and safety to the working population through regular educational sessions at the workplaces as at training and development center (T and DC) is also part of our services. The proneness for effects of exposure to ionizing radiation is enhanced by various factors related to the family history of chronic diseases, nutritional status of the individuals, the lifestyle factors apart from psycho-social factors like illiteracy, ignorance, negligence and inadequate utilization of personal protective equipment (PPE) at workplace. To evaluate the prevalence of such contributory risk factors, a pilot study has been conducted in Visakhapatnam Steel Plant. The data is obtained through routine periodical medical examination of workers at the Occupational Health Services Center through standard format. The study revealed statistically high prevalence of the risk factors and indicated the necessity of intensifying primary prevention methods in addition to environmental control and usage of PPE. (Author)

  12. Radiation effects-prevalence of contributory risk factors a pilot study in Visakhapthnam steel plant

    Energy Technology Data Exchange (ETDEWEB)

    Lakshman rao, K. V.

    2004-07-01

    Integrated Steel Plants contribute significant air pollution, water pollution and solid waste generation. Diverse occupational health hazards present is steel industry pose ill effects to the industrial workers. Occupational health services and research center (OHS and RC) of this plant established in the year 1992 to protect the health and well-being of all the employees working in different occupations. the primary role OHS and RC is to conduct periodical medical examinations, monitoring of the working environments, suggest the suitable personal protective equipment to the workers, evaluate risk factors, work practices, risk management and industrial toxicological studies. Dissemination of information related to occupational health and safety to the working population through regular educational sessions at the workplaces as at training and development center (T and DC) is also part of our services. The proneness for effects of exposure to ionizing radiation is enhanced by various factors related to the family history of chronic diseases, nutritional status of the individuals, the lifestyle factors apart from psycho-social factors like illiteracy, ignorance, negligence and inadequate utilization of personal protective equipment (PPE) at workplace. To evaluate the prevalence of such contributory risk factors, a pilot study has been conducted in Visakhapatnam Steel Plant. The data is obtained through routine periodical medical examination of workers at the Occupational Health Services Center through standard format. The study revealed statistically high prevalence of the risk factors and indicated the necessity of intensifying primary prevention methods in addition to environmental control and usage of PPE. (Author)

  13. Experimental investigation of the chemical looping method on a 1 MW pilot plant

    International Nuclear Information System (INIS)

    Orth, Matthias

    2014-01-01

    Attempting to counteract the consequences of climate change, leading industrial nations have agreed on reducing their CO 2 emissions significantly. To reach these reduction goals, it is essential to reduce the CO 2 emissions in the field of energy conversion. This PHD thesis covers the field of chemical looping combustion, a technology that uses fossil fuels for energy conversion with inherent capture of CO 2 . Since the research regarding chemical looping had so far focused mainly on lab scale or small scale experiments, a 1 MW pilot plant has been erected at Technische Universitaet Darmstadt in order to investigate the process in a semi-industrial scale and to check the process efficiency with commercially usable equipment. This pilot consists of two interconnected fluidized bed reactors and has an overall height of more than 11 m. In this thesis, some experiments with ilmenite - used as the oxygen carrier - are explained. Furthermore, the design, erection and commissioning of the pilot plant are presented as well as the results of the first test campaigns. The evaluation of the latter proves that the process can be handled in the design configuration and that CO 2 can be safely captured in a pilot plant of this scale.

  14. Design of a pilot plant to study wastewater treatability. Utilization to nitrification-denitrification treatment of urban wastewater; Diseno de una plant pilot para estudios de tratabilidad de aguas residuales. Aplicacion a la nitrificacion/desnitrificaciond e aguas urbanas

    Energy Technology Data Exchange (ETDEWEB)

    Otal, E.; Vilches, L. F.; Pineda, D.; Garcia, A.; Fernandez-Pereira, C.

    2002-07-01

    The conventional design and the operation of secondary treatment of urban wastewater treatment plants presents different problems such as bulking foaming, the removal of nutrients as nitrogen and phosphorus, and the excess of sludge. to prevent these problems the use of selectors was initially proposed to selects the floc-formers bacteria against the filamentous microorganisms. In addition, these configurations removed nitrogen by the nitrification-denitrification mechanism and some of them removed both nitrogen and phosphors. In the last years, new systems have been developed to remove nitrogen, reducing the consumption of oxygen and the production of sludge by the use of different microorganisms, and by modifying environmental and operational conditions. To study the treatment urban wastewater in conditions similar to those existing in wastewater treatment plants and to improve the design and operational parameters of a large scale wastewater treatment plant, a versatile pilot plant has been designed. The main components of the plant are described in this paper. (Author) 18 refs.

  15. General Atomic reprocessing pilot plant: description and results of initial testing

    International Nuclear Information System (INIS)

    1977-12-01

    In June 1976 General Atomic completed the construction of a reprocessing head-end cold pilot plant. In the year since then, each system within the head end has been used for experiments which have qualified the designs. This report describes the equipment in the plant and summarizes the results of the initial phase of reprocessing testing

  16. Rock mechanics activities at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Francke, C.; Saeb, S.

    1996-01-01

    The application of rock mechanics at nuclear waste repositories is a true multidisciplinary effort. A description and historical summary of the Waste Isolation Pilot Plant (WIPP) is presented. Rock mechanics programs at the WIPP are outlined, and the current rock mechanics modeling philosophy of the Westinghouse Waste Isolation Division is discussed

  17. Fusion pilot plant scoping study

    International Nuclear Information System (INIS)

    Gierszewski, P.J.; Blevins, P.J.; Brunnader, H.; Natalizio, A.; Cumyn, P.; Dean, B.; Smith, S.; Galambos, J.; Holloway, C.; Stremlaw, J.; Williams, G.

    1994-05-01

    CFFTP Pilot is representative of a class of machines that, like NPD in the CANDU development program, could test the key reactor core technologies on an integrated power reactor relevant system (materials, conditions, configuration). But in order to reduce costs, the machine would operate at reduced neutron flux relative to a power reactor, would not produce electricity, and would not test superconducting magnets. This design shows research directions towards a machine that could provide integrated nuclear testing (but not ignition physics) at a cost of about 1/3 ITER CDA. The test volume - the outboard blanket volume - would be comparable to the test port volume on ITER CDA, while the fluence and power density would be about 1/4 ITER CDA. 91 refs., 43 tabs., 45 figs

  18. Fusion pilot plant scoping study

    Energy Technology Data Exchange (ETDEWEB)

    Gierszewski, P J; Blevins, P J; Brunnader, H; Natalizio, A [Canadian Fusion Fuels Technology Project, Toronto, ON (Canada); Cumyn, P [Canatom Ltd., Montreal, PQ (Canada); Dean, B; Smith, S [Wardrop (W.L.) and Associates Ltd., Winnipeg, MB (Canada); Galambos, J [Oak Ridge National Lab., TN (United States); Holloway, C [Spar Aerospace Ltd., Toronto, ON (Canada); Stremlaw, J [Monenco AGRA Inc., Calgary, AB (Canada); Williams, G [Spectrum Engineering Corp., Peterborough, ON (Canada)

    1994-05-01

    CFFTP Pilot is representative of a class of machines that, like NPD in the CANDU development program, could test the key reactor core technologies on an integrated power reactor relevant system (materials, conditions, configuration). But in order to reduce costs, the machine would operate at reduced neutron flux relative to a power reactor, would not produce electricity, and would not test superconducting magnets. This design shows research directions towards a machine that could provide integrated nuclear testing (but not ignition physics) at a cost of about 1/3 ITER CDA. The test volume - the outboard blanket volume - would be comparable to the test port volume on ITER CDA, while the fluence and power density would be about 1/4 ITER CDA. 91 refs., 43 tabs., 45 figs.

  19. Performance and Model Calibration of R-D-N Processes in Pilot Plant

    DEFF Research Database (Denmark)

    de la Sota, A.; Larrea, L.; Novak, L.

    1994-01-01

    This paper deals with the first part of an experimental programme in a pilot plant configured for advanced biological nutrient removal processes treating domestic wastewater of Bilbao. The IAWPRC Model No.1 was calibrated in order to optimize the design of the full-scale plant. In this first phas...

  20. Study of economic viability of biodiesel pilot plant; Estudo de viabilidade economica de planta piloto de biodiesel

    Energy Technology Data Exchange (ETDEWEB)

    Pagliardi, Odail; Maciel, Antonio Jose da Silva; Lopes, Osvaldo Candido; Albiero, Daniel [Universidade Estadual de Campinas (FEAGRI/UNICAMP), SP (Brazil). Fac. de Engenharia Agricola

    2006-07-01

    The present paper shows the economics viability of a half-industrial plant, operating with the transesterification in vegetal oil transformation or animal fats to bio diesel. The pilot plant needed an investment of R$ 400,000.00, and it showed viable with 99.99 percents of efficiency, with feeding of 100 kg per hour of raw material working in only 12 hours daily at 25 days per months. It was considered the more usual economic analysis tools, as payback, internal rate of return and net present value. (author)

  1. Particle collection by a pilot plant venturi scrubber downstream from a pilot plant electrostatic precipitator

    Science.gov (United States)

    Sparks, L. E.; Ramsey, G. H.; Daniel, B. E.

    The results of pilot plant experiments of particulate collection by a venturi scrubber downstream from an electrostatic precipitator (ESP) are presented. The data, which cover a range of scrubber operating conditions and ESP efficiencies, show that particle collection by the venturi scrubber is not affected by the upstream ESP; i.e., for a given scrubber pressure drop, particle collection efficiency as a function of particle diameter is the same for both ESP on and ESP off. The experimental results are in excellent agreement with theoretical predictions. Order of magnitude cost estimates indicate that particle collection by ESP scrubber systems may be economically attractive when scrubbers must be used for SO x control.

  2. Process control of an HTGR fuel reprocessing cold pilot plant

    International Nuclear Information System (INIS)

    Rode, J.S.

    1976-10-01

    Development of engineering-scale systems for a large-scale HTGR fuel reprocessing demonstration facility is currently underway in a cold pilot plant. These systems include two fluidized-bed burners, which remove the graphite (carbon) matrix from the crushed HTGR fuel by high temperature (900 0 C) oxidation. The burners are controlled by a digital process controller with an all analog input/output interface which has been in use since March, 1976. The advantages of such a control system to a pilot plant operation can be summarized as follows: (1) Control loop functions and configurations can be changed easily; (2) control constants, alarm limits, output limits, and scaling constants can be changed easily; (3) calculation of data and/or interface with a computerized information retrieval system during operation are available; (4) diagnosis of process control problems is facilitated; and (5) control panel/room space is saved

  3. Pressurized fluidized bed combustion combined cycle power plant with coal gasification: Second generation pilot plant

    International Nuclear Information System (INIS)

    Farina, G.L.; Bressan, L.

    1991-01-01

    This paper presents the technical and economical background of a research and development program of a novel power generation scheme, which is based on coal gasification, pressurized fluid bed combustion and combined cycles. The participants in this program are: Foster Wheeler (project leader), Westinghouse, IGT and the USA Dept. of Energy. The paper describes the characteristics of the plant, the research program in course of implementation, the components of the pilot plant and the first results obtained

  4. Studying on design of a complete pilot plant for processing sandstone ores in Pa Lua-Pa Rong area

    International Nuclear Information System (INIS)

    Le Quang Thai; Tran Van Son; Vu Khac Tuan; Tran The Dinh; Trinh Nguyen Quynh; Doan Thi Mo; Nguyen Hong Ha; Bui Thi Bay; Pham Minh Tuan; Than Van Lien

    2015-01-01

    Design, construction and operation of a pilot for processing uranium containing ores are important stages in the process of project development of uranium production from ores because uranium contained minerals and the composition of minerals are unstable factors. In this case, pilot needs to be a simulation of a plant in the future, but with upgrade equipment compared that at laboratory scale. Results of lab research were used to select the most appropriate process for ore processing and selection of equipment for each stages. In the circumstance when there has been a lack of experience in processing uranium ores in Vietnam, the design and construction of such a pilot with completed technological procedures are essential. The main purpose of this work is to verify results of lab researches and optimize operational parameters of the process. In addition, several purposes were also considered such as study on the effects of solution circulation/recycling and accumulation of impurities in a long run; obtain necessary and sufficient information for design, cost estimate for investment and operation. The pilot only can achieve the expected objectives when ore sources (including reserves and characteristics) are determined; a complete technological process for obtaining technical uranium (yellowcake) is designed; investment and operational capitals are estimated and these estimates show the costs and benefits of the process. In this article, the authors will focus on the presentation of research results, including data on ore, process technology, material balance, pilot scale, the basic parameters of equipment, installation diagram of equipment, construction, power and water needs identification, preliminary calculation of investment and operational costs. (author)

  5. Sequential Design of Experiments to Maximize Learning from Carbon Capture Pilot Plant Testing

    Energy Technology Data Exchange (ETDEWEB)

    Soepyan, Frits B.; Morgan, Joshua C.; Omell, Benjamin P.; Zamarripa-Perez, Miguel A.; Matuszewski, Michael S.; Miller, David C.

    2018-02-06

    Pilot plant test campaigns can be expensive and time-consuming. Therefore, it is of interest to maximize the amount of learning and the efficiency of the test campaign given the limited number of experiments that can be conducted. This work investigates the use of sequential design of experiments (SDOE) to overcome these challenges by demonstrating its usefulness for a recent solvent-based CO2 capture plant test campaign. Unlike traditional design of experiments methods, SDOE regularly uses information from ongoing experiments to determine the optimum locations in the design space for subsequent runs within the same experiment. However, there are challenges that need to be addressed, including reducing the high computational burden to efficiently update the model, and the need to incorporate the methodology into a computational tool. We address these challenges by applying SDOE in combination with a software tool, the Framework for Optimization, Quantification of Uncertainty and Surrogates (FOQUS) (Miller et al., 2014a, 2016, 2017). The results of applying SDOE on a pilot plant test campaign for CO2 capture suggests that relative to traditional design of experiments methods, SDOE can more effectively reduce the uncertainty of the model, thus decreasing technical risk. Future work includes integrating SDOE into FOQUS and using SDOE to support additional large-scale pilot plant test campaigns.

  6. Water-gas shift (WGS) Operation of Pre-combustion CO2 Capture Pilot Plant at the Buggenum IGCC

    NARCIS (Netherlands)

    Van Dijk, H.A.J.; Damen, K.; Makkee, M.; Trapp, C.

    2014-01-01

    In the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was built and operated at the Buggenum IGCC power plant, the Netherlands. The pilot consist of sweet water-gas shift, physical CO2 absorption and CO2 compression. The technology performance was verified and

  7. Waste Isolation Pilot Plant CY 2000 Site Environmental Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

    2001-01-01

    The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse

  8. Waste Isolation Pilot Plant CY 2000 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

    2001-12-31

    The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no

  9. Decontamination and decommissioning of the EBR-I complex. Topical report No. 3. NAK disposal pilot plant test

    International Nuclear Information System (INIS)

    Commander, J.C.; Lewis, L.; Hammer, R.

    1975-06-01

    Decontamination and decommissioning of the Experimental Breeder Reactor No. 1 (EBR-I) requires processing of the primary coolant, an eutectic solution of sodium and potassium (NaK), remaining in the EBR-I primary and secondary coolant systems. While developing design criteria for the NaK processing system, reasonable justification was provided for the development of a pilot test plant for field testing some of the process concepts and proposed hardware. The objective of this activity was to prove the process concept on a low-cost, small-scale test bed. The pilot test plant criteria provided a general description of the test including: the purpose, location, description of test equipment available, waste disposal requirements, and a flow diagram and conceptual equipment layout. The pilot plant test operations procedure provided a detailed step-by-step procedure for operation of the pilot plant to obtain the desired test data and operational experience. It also spelled out the safety precautions to be used by operating personnel, including the requirement for alkali metals training certification, use of protective clothing, availability of fire protection equipment, and caustic handling procedures. The pilot plant test was performed on May 16, 1974. During the test, 32.5 gallons or 240 lb of NaK was successfully converted to caustic by reaction with water in a caustic solution. (auth)

  10. Results of the DIOS pilot plant test and summary of the joint research; DIOS pilot plant no shiken sogyo kekka to kenkyu seika no matome

    Energy Technology Data Exchange (ETDEWEB)

    Sugiyama, T [Center for Coal Utilization, Japan, Tokyo (Japan); Kawaoka, K [The Japan Iron and Steel Federation, Tokyo (Japan)

    1996-09-01

    A joint research had been carried out with a subsidy from the Agency of Natural Resources and Energy since fiscal 1988 to fiscal 1995 on the direct iron ore smelting reduction process (DIOS process). The process utilizes coal directly as a process to use the strong points and supplement the weak points of the blast furnace process. During the period, a pilot plant had been operated since 1993. Upon having completed the feasibility study, this paper reports the result thereof. The main facilities consist of a smelting and reducing furnace of iron bath type, a spare reducing furnace of fluidized bed type, and a preheating furnace. The former two furnaces constitute a unit structure with the two furnaces connected vertically. The pilot plant achieved a three-day continuous operation producing 500 tons of iron every day. The production rate reached 21 tons an hour at an upward oxygen blowing velocity of about 13,000 Nm {sup 3} per hour. The coal unit requirement showed a result of <1000 kg/t for high VM coal and <900 kg/t for low VM coal. These results verified a possibility that this process can supplement or replace the blast furnace process even for a production scale of 9000 tons a day. 7 refs., 15 figs., 3 tabs.

  11. Electrocoagulation project: Pilot study testwork

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Garand, D.K.; Hassan, T.A.; Kar, K.L.; Thind, S.S.

    1991-09-01

    When a suspension or emulsion flows between two sacrificial metal electrodes excited by ac, the dispersed phase is consolidated and then settles. Laboratory-scale investigation of this mechanism, called electrocoagulation, and of its areas of application to water treatment were previously completed and a subsequent project was initiated to design and construct pilot-scale equipment consisting of an electrocoagulation cell, power supply, and computerized control system. The constructed pilot plant was used to test the effectiveness of electrocoagulation to clarify coal processing plant effluent. Results obtained with clay suspensions showed that flow conditions in the cell have a major effect on electric power consumption, and a reduction by a factor of three on this crucial cost parameter appeared possible compared to a previously tested batch-scale electrocoagulation system. Results obtained using the coal plant thickener feed closely duplicated those obtained with the clay mixtures. Aluminum electrode consumption, however, remained unchanged compared to the bench-scale tests. Supernatant clarity far exceeded requirements, while settling rate was too low. The settling could be speeded up by appropriate use of chemicals, but such addition affects the coagulation mechanism and reduces supernatant clarity. A tradeoff between settling rate and clarity was thus established. The total cost of treatment was deemed to be in excess of coal company requirements, but the pilot tests revealed much about the electrocoagulation system under continuous flow conditions. The technology is seen as having application in other areas such as municipal and industrial waste treatment. 22 refs., 6 figs., 2 tabs.

  12. Pilot plant for the radioactive decontamination of spent oils

    International Nuclear Information System (INIS)

    Flores E, R.M.; Ortiz O, H.V.; Cisneros L, L.; Lopez G, R.

    2002-01-01

    In this work the operation parameters obtained in the laboratory of oil storage are presented, as well as the operations which shape the pilot plant, the design criteria and the basic design of the core equipment of the developed process. Finally, the comparative results obtained the decontamination process of oil are given as well as laboratory scale. (Author)

  13. Modeling temperature variations in a pilot plant thermophilic anaerobic digester.

    Science.gov (United States)

    Valle-Guadarrama, Salvador; Espinosa-Solares, Teodoro; López-Cruz, Irineo L; Domaschko, Max

    2011-05-01

    A model that predicts temperature changes in a pilot plant thermophilic anaerobic digester was developed based on fundamental thermodynamic laws. The methodology utilized two simulation strategies. In the first, model equations were solved through a searching routine based on a minimal square optimization criterion, from which the overall heat transfer coefficient values, for both biodigester and heat exchanger, were determined. In the second, the simulation was performed with variable values of these overall coefficients. The prediction with both strategies allowed reproducing experimental data within 5% of the temperature span permitted in the equipment by the system control, which validated the model. The temperature variation was affected by the heterogeneity of the feeding and extraction processes, by the heterogeneity of the digestate recirculation through the heating system and by the lack of a perfect mixing inside the biodigester tank. The use of variable overall heat transfer coefficients improved the temperature change prediction and reduced the effect of a non-ideal performance of the pilot plant modeled.

  14. Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report

    Energy Technology Data Exchange (ETDEWEB)

    James E. Francfort

    2003-12-01

    Hydrogen has promise to be the fuel of the future. Its use as a chemical reagent and as a rocket propellant has grown to over eight million metric tons per year in the United States. Although use of hydrogen is abundant, it has not been used extensively as a transportation fuel. To assess the viability of hydrogen as a transportation fuel and the viability of producing hydrogen using off-peak electric energy, Pinnacle West Capital Corporation (PNW) and its electric utility subsidiary, Arizona Public Service (APS) designed, constructed, and operates a hydrogen and compressed natural gas fueling station—the APS Alternative Fuel Pilot Plant. This report summarizes the design of the APS Alternative Fuel Pilot Plant and presents lessons learned from its design and construction. Electric Transportation Applications prepared this report under contract to the U.S. Department of Energy’s Advanced Vehicle Testing Activity. The Idaho National Engineering and Environmental Laboratory manages these activities for the Advanced Vehicle Testing Activity.

  15. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    Energy Technology Data Exchange (ETDEWEB)

    Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing

  16. Fate of NDMA precursors through an MBR-NF pilot plant for urban wastewater reclamation and the effect of changing aeration conditions.

    Science.gov (United States)

    Mamo, Julian; Insa, Sara; Monclús, Hèctor; Rodríguez-Roda, Ignasi; Comas, Joaquim; Barceló, Damià; Farré, Maria José

    2016-10-01

    The removal of N-nitrosodimethylamine (NDMA) formation potential through a membrane bioreactor (MBR) coupled to a nanofiltration (NF) pilot plant that treats urban wastewater is investigated. The results are compared to the fate of the individual NDMA precursors detected: azithromycin, citalopram, erythromycin, clarithromycin, ranitidine, venlafaxine and its metabolite o-desmethylvenlafaxine. Specifically, the effect of dissolved oxygen in the aerobic chamber of the MBR pilot plant on the removal of NDMA formation potential (FP) and individual precursors is studied. During normal aerobic operation, implying a fully nitrifying system, the MBR was able to reduce NDMA precursors above 94%, however this removal percentage was reduced to values as low as 72% when changing the conditions to minimize nitrification. Removal decreased also for azithromycin (68-59%), citalopram (31-17%), venlafaxine (35-15%) and erythromycin (61-16%) on average during nitrifying versus non-nitrifying conditions. The removal of clarithromycin, o-desmethylvenlafaxine and ranitidine could not be correlated with the nitrification inhibition, as it varied greatly during the experiment time. The MBR pilot plant is coupled to a nanofiltration (NF) system and the results on the rejection of both, NDMA FP and individual precursors, through this system was above 90%. Finally, results obtained for the MBR pilot plant are compared to the percentage of removal by a conventional full scale biological wastewater treatment plant (WWTP) fed with the same influent. During aerobic operation, the removal of NDMA FP by the MBR pilot plant was similar to the full scale WWTP. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. The 10 MWe Solar Thermal Central Receiver Pilot Plant: Solar facilities design integration. Pilot-plant station manual (RADL Item 2-1). Volume 1: System description

    Science.gov (United States)

    1982-09-01

    The complete Barstow Solar Pilot Plant is described. The plant requirements and general description are presented, the mechanical, electric power, and control and instrumentation systems as well as civil engineering and structural aspects and the station buildings are described. Included in the mechanical systems are the heliostats, receiver, thermal storage system, beam characterization system, steam, water, nitrogen, and compressed air systems, chemical feed system, fire protection system, drains, sumps and the waste disposal systems, and heating, ventilating, and air conditioning systems.

  18. A review on pilot plant development models

    International Nuclear Information System (INIS)

    Rosli Darmawan

    2005-01-01

    After more than 30 years, MINT has been able to produce many new findings, products and processes. Some of these have been able to penetrate local and international markets. This was achieved through a systematic commercialisation program practiced in MINT with its technological chain and MINT Technology Park program. This paper will review the development process of MINT pilot plants and compare them with a few other models from other institutions in Malaysia and abroad. The advantages and disadvantages of each model are reviewed and a discussion against MINT's model is presented. (Author)

  19. Vitrification pilot plant experiences at Fernald, Ohio

    International Nuclear Information System (INIS)

    Akgunduz, N.; Gimpel, R.F.; Paine, D.; Pierce, V.H.

    1997-01-01

    A one metric ton/day Vitrification Pilot Plant (VITPP) at Fernald, Ohio, simulated the vitrification of radium and radon bearing silo residues using representative non-radioactive surrogates containing high concentrations of lead, sulfates, and phosphates. The vitrification process was carried out at temperatures of 1,150 to 1,350 C. The VITPP processed glass for seven months, until a breach of the melter containment vessel suspended operations. More than 70,000 pounds of surrogate glass were produced by the VITPP. Experiences, lessons learned, and path forward will be presented

  20. Development of pilot model of virtual nuclear power plant and its application to radiation management

    International Nuclear Information System (INIS)

    Kang, K. D.; Sin, S. W.

    2002-01-01

    Using Virtual Reality (VR) technique, a real model for radiation controlled area in nuclear power plant was developed and a feasibility study to develop a computational program to estimate radiation dose was performed. For this purpose a pilot model with an dynamic function and bi-directional communication was developed. This model was enhanced from the existing 3-D single-directional communication. In this pilot model, a plant visitor needs a series of security checking process initially. If he(she) enters the controlled area and approaches radiation hazard area, the alarms with warning lamp will be initiated automatically. Throughout the test to connect this model from both domestic and international sites in various time zones it has proven that it showed a sufficient performance. Therefore this model can be applied to broad fields as radiation protection procedures photographic data, on-line dose program

  1. Central receiver solar thermal power system, Phase 1. CRDL Item 2. Pilot plant preliminary design report. Volume III, Book 2. Collector subsystem

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    The methods and plans for the manufacture of the 10-MW collector heliostats and associated controls for the pilot plant are detailed. An in-depth description of the production, installation, and verification testing of heliostats for the pilot plant is presented. Specifications for the performance, design, and test requirements for the pilot plant collector subsystem are included. Also, a heliostat location summary report is given. (WHK)

  2. Design of preconcentration flow-sheet for processing Bhimunipatnam beach sands using pilot plant experiments and computer simulation

    International Nuclear Information System (INIS)

    Padmanabhan, N.P.H.; Sridhar, U.

    1993-01-01

    Simulation was carried out using a beach sand beneficiation plant simulator software, SANDBEN, currently being developed in Indian School of Mines, Dhanbad, and the results were compared and analyzed with those obtained by actual pilot plant experiments on a beach sand sample from Bhimunipatnam deposit. The software is discussed and its capabilities and limitations are highlighted. An optimal preconcentrator flow-sheet for processing Bhimunipatnam beach sand was developed by simulation and using the results of the pilot plant experiments. (author). 13 refs., 2 tabs., 3 figs

  3. FY 1993 report on the results of the subsidy project for the Sunshine Project. Development of coal use hydrogen production technology (Support study of pilot plant - Study using the small equipment); 1993 nendo Sunshine keikaku hojo jigyo seika hokokusho. Sekitan riyo suiso seizo gijutsu kaihatsu - Pilot plant no shien kenkyu (Kogata souchi ni yoru kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    As to the development of coal use hydrogen production technology, the paper studied the reactivity of char and ignition characteristics of various coals in the use of electric furnace and the participation in pilot plant test and the improvement, and the FY 1993 results were reported. In the study of reactivity of char, it was found that the reactivity was the same, regardless of the equipment and kind of raw coal, if considered of the ratio of the total oxygen amount (the char-containing oxygen amount added to the oxygen supply amount) to the carbon supply amount in char. In the test on ignition characteristics of overseas coals, the same characteristics as those of the Taiheiyo coal conventionally tested were obtained and it was found that it was good to use the same method for start-up of gasifier as conventionally used. In the pilot plant test in the previous year, slag and ash stuck to the outlet of the gasification part and heat recovery part and developed, which hindered the continued operation. To improve it, the following were carried out: model study, study of ash sintering, study using the synthetic test equipment, analysis of the deposit in gasifier, etc. Based on these results, the plant was improved, and the continued operation of 1,149 hours was stably achieved in RUN8. (NEDO)

  4. Pilot project concerning the establishment of a collective biomass conversion plant on the island of Mors

    International Nuclear Information System (INIS)

    1993-06-01

    This pilot project comprises a feasibility study in connection with plans to establish a biomass conversion plant, on the Danish island of Mors, which would provide methane to be used as fuel, in combination with natural gas, for a cogeneration plant serving six villages. The subjects of location, organization, the transportation of biomass, the design of the biomass conversion plant, economical aspects and conditions of the use of the methane are discussed as a basis for decisions in this respect. Environmental considerations are also dealt with. (AB)

  5. WIPP conceptual design report. Addendum A. Design calculations for Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1977-04-01

    The design calculations for the Waste Isolation Pilot Plant (WIPP) are presented. The following categories are discussed: general nuclear calculations; radwaste calculations; structural calculations; mechanical calculations; civil calculations; electrical calculations; TRU waste surface facility time and motion analysis; shaft sinking procedures; hoist time and motion studies; mining system analysis; mine ventilation calculations; mine structural analysis; and miscellaneous underground calculations

  6. Environmentally friendly production of charcoal from empty fruit bunches using pilot plant

    International Nuclear Information System (INIS)

    Normah Mulop; Mohd Suffian Abdul Rahim

    2000-01-01

    Empty fruit bunches (EFB) from palm oil milling process are classified as palm oil waste. The EFB can be turned into valuable product such as charcoal, which can be processed further to activated carbon in order to solve some of the disposal problems. In this project, raw EFB was converted to charcoal by means of a pilot plant. A burner generating indirect heat controls the temperature of the process. The carbonization process was carried out in the absence of air at various temperatures and durations to find the optimum carbonization parameters. The study shows that the optimum operating, temperature for carbonization of EFB is 500 o C for the duration of 11/2 hours. The average fixed carbon content of the charcoal is 61.08. The high percentage of volatile matter is prevented from escaping into the air by trapping them in a series of cyclones. The double layered cyclones using water as the cooling medium, condense more volatile matter and reduces smoke exhaust. 50.7 % of ,gaseous product is condensed and 49.2 % is emitted to the atmosphere. The result is an environmental friendly pilot plant. (author)

  7. Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services

    2003-09-17

    The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

  8. Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002

    International Nuclear Information System (INIS)

    Washington Regulatory and Environmental Services

    2003-01-01

    The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED)

  9. The Stored Waste Examination Pilot Plant program at the INEL

    International Nuclear Information System (INIS)

    McKinley, K.B.; Anderson, B.C.; Clements, T.L.; Hinckley, J.P.; Mayberry, J.L.; Smith, T.H.

    1983-01-01

    Since 1970, defense transuranic waste has been placed into 20-year retrievable storage at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory (INEL). A major objective of the U.S. Department of Energy (DOE) Nuclear Waste Management Program is to remove all retrievably stored transuranic waste from the INEL. The January 1981 DOE Record of Decision on the Waste Isolation Pilot Plant (WIPP) stated, ''The WIPP facility will dispose of defense transuranic waste stored retrievably at the Idaho National Engineering Laboratory.'' After retrieval and before shipment, processing may be necessary to prepare the waste for acceptance, handling, and enhanced long-term isolation in the WIPP. However, some of the waste is certifiable to the WIPP waste acceptance criteria without container opening or waste processing. To minimize costs, the Stored Waste Examination Pilot Plant (SWEPP) is being developed to certify INEL stored transuranic waste without container opening or waste processing. The SWEPP certification concept is based on records assessment, nondestructive examination techniques, assay techniques, health physics examinations, and limited opening of containers at another facility for quality control

  10. Dismantling of an alpha contaminated hot cell at the Marcoule Pilot Plant

    International Nuclear Information System (INIS)

    Tachon, M.

    1988-01-01

    For the remodeling of Marcoule Pilot Plant, the cell 82: old unit for plutonium solution purification by extraction, was dismantled. About 42 tons of wastes were evacuated. Some wastes wen decontaminated by mechanical means other wastes with higher residual activity were stored for subsequent processing. The operation shows that dismantling of a hot cell is possible even if incorporated in an operating plant [fr

  11. Pilot incineration plant for solid, combustible, and low-level wastes

    International Nuclear Information System (INIS)

    Francioni, W.M.

    Radioactively contaminated wastes are formed in the handling of radioactive materials at the Federal Institute for Reactor Research (FIRR) and in other facilities, hospitals, sanitoria, industry, and nuclear power plants. A large part of the wastes are combustible and only very slightly radioactive. Incineration of these wastes is obvious. A pilot incineration plant, henceforth called the PIP, for radioactive combustible wastes of the FIRR is surveyed. The plant and its individual components are described. The production costs of the plant and experience gained in operation available at present are reviewed. Solid combustible radioactive waste can be incinerated in the PIP. The maximum possible reduction in volume of these wastes is achieved by incineration. Subsequently the chemically sterile ashes can be consolidated in a stable block suitable for long-term storage mixing with cement

  12. Selective absorption pilot plant for decontamination of fuel reprocessing plant off-gas

    Energy Technology Data Exchange (ETDEWEB)

    Stephenson, M.J.; Eby, R.S.; Huffstetler, V.C.

    1977-10-01

    A fluorocarbon-based selective absorption process for removing krypton-85, carbon-14, and radon-222 from the off-gas of conventional light water and advanced reactor fuel reprocessing plants is being developed at the Oak Ridge Gaseous Diffusion Plant in conjunction with fuel recycle work at the Oak Ridge National Laboratory and at the Savannah River Laboratory. The process is characterized by an especially high tolerance for many other reprocessing plant off-gas components. This report presents detailed drawings and descriptions of the second generation development pilot plant as it has evolved after three years of operation. The test facility is designed on the basis of removing 99% of the feed gas krypton and 99.9% of the carbon and radon, and can handle a nominal 15 scfm (425 slm) of contaminated gas at pressures from 100 to 600 psig (7.0 to 42.2 kg/cm/sup 2/) and temperatures from minus 45 to plus 25/sup 0/F (-43 to -4/sup 0/C). Part of the development program is devoted to identifying flowsheet options and simplifications that lead to an even more economical and reliable process. Two of these applicative flowsheets are discussed.

  13. Improvement of the residual water treatment in the EDAR of Alcoi (Alicante). Study with plant pilot; Mejora del tratamiento de aguas residuales en la EDAR de Alcoi (Alicante). Estudio con plant piloto

    Energy Technology Data Exchange (ETDEWEB)

    Morenilla Martinez, J. J.; Bernacer Bonora, I.; Canigral Ferrer, C.; Martinez Muro, M. A.; Sanchez Betran, A. V.; Minana Mira, J. L.

    2005-07-01

    The present installations of Wastewater Treatment Plant of Alcoi receive industrial spills, that deteriorate to the effectiveness of the biological process and therefore the quality of the treated effluent. To initiative of the Entidad Publica de Saneamiento de Aguas Residuales de Valencia (EPSAR) has been made a study to investigate in the factors that affect the process and the possible technical solutions. For it has resorted to the use of a portable pilot plant, able to reproduce the treatment of a real installation on reduced scale of experimental form. (Author) 10 refs.

  14. Pilot-plant development of a Rover waste calcination flowsheet

    International Nuclear Information System (INIS)

    Birrer, S.A.

    1978-04-01

    Results of eight runs, six using the 10-cm dia and two using the 30-cm dia pilot-plant calciners, in which simulated first-cycle Rover waste was calcined, are described. Results of the tests showed that a feed blend consisting of one volume simulated first-cycle Rover waste and one or two volumes simulated first-cycle zirconium waste could not be successfully calcined. 5 figs., 8 tables

  15. Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989

    International Nuclear Information System (INIS)

    1989-01-01

    This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs

  16. Central receiver solar thermal power system, Phase 1. CDRL item 2. Pilot plant preliminary design report. Volume VI. Electrical power generation and master control subsystems and balance of plant

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    The requirements, performance, and subsystem configuration for both the Commercial and Pilot Plant electrical power generation subsystems (EPGS) and balance of plants are presented. The EPGS for both the Commercial Plant and Pilot Plant make use of conventional, proven equipment consistent with good power plant design practices in order to minimize risk and maximize reliability. The basic EPGS cycle selected is a regenerative cycle that uses a single automatic admission, condensing, tandem-compound double-flow turbine. Specifications, performance data, drawings, and schematics are included. (WHK)

  17. Demonstration of a 100-kWth high-temperature solar thermochemical reactor pilot plant for ZnO dissociation

    Science.gov (United States)

    Koepf, E.; Villasmil, W.; Meier, A.

    2016-05-01

    Solar thermochemical H2O and CO2 splitting is a viable pathway towards sustainable and large-scale production of synthetic fuels. A reactor pilot plant for the solar-driven thermal dissociation of ZnO into metallic Zn has been successfully developed at the Paul Scherrer Institute (PSI). Promising experimental results from the 100-kWth ZnO pilot plant were obtained in 2014 during two prolonged experimental campaigns in a high flux solar simulator at PSI and a 1-MW solar furnace in Odeillo, France. Between March and June the pilot plant was mounted in the solar simulator and in-situ flow-visualization experiments were conducted in order to prevent particle-laden fluid flows near the window from attenuating transparency by blocking incoming radiation. Window flow patterns were successfully characterized, and it was demonstrated that particle transport could be controlled and suppressed completely. These results enabled the successful operation of the reactor between August and October when on-sun experiments were conducted in the solar furnace in order to demonstrate the pilot plant technology and characterize its performance. The reactor was operated for over 97 hours at temperatures as high as 2064 K; over 28 kg of ZnO was dissociated at reaction rates as high as 28 g/min.

  18. Biomass conversion to hydrocarbon fuels using the MixAlco™ process at a pilot-plant scale

    International Nuclear Information System (INIS)

    Taco Vasquez, Sebastian; Dunkleman, John; Chaudhuri, Swades K.; Bond, Austin; Holtzapple, Mark T.

    2014-01-01

    Texas A and M University has built a MixAlco™ pilot plant that converts biomass to hydrocarbons (i.e., jet fuel, gasoline) using the following steps: fermentation, descumming, dewatering, thermal ketonization, distillation, hydrogenation, and oligomerization. This study describes the pilot plant and reports results from an 11-month production campaign. The focus was to produce sufficient jet fuel to be tested by the U.S. military. Because the scale was relatively small, energy-saving features were not included in the pilot plant. Further, the equipment was operated in a manner to maximize productivity even if yields were low. During the production campaign, a total of 6.015 Mg of shredded paper and 120 kg of chicken manure (dry basis) were fermented to produce 126.5 m 3 of fermentation broth with an average concentration of 12.5 kg m −3 . A total of 1582 kg of carboxylate salts were converted to 587 L of raw ketones, which were distilled and hydrogenated to 470 L of mixed alcohols ranging from C3 to C12. These alcohols, plus 300 L of alcohols made by an industrial partner (Terrabon, Inc.) were shipped to an independent contractor (General Electric) and transformed to jet fuel (∼100 L) and gasoline (∼100 L) byproduct. - Highlights: • We produce hydrocarbons from paper and chicken manure in a pilot-scale production using the MixAlco™ process. • About 100 L of jet fuel were produced for military testing. • High production rates and good product quality were preferred rather than high yields or energy efficiency. • The MixAlco™ process converted successfully lignocellulosic biomass to hydrocarbons and viable for commercial-scale production

  19. Modernization and enlarging of the Marcoule pilot plant for R and D

    International Nuclear Information System (INIS)

    Calame-Longjean, A.; Revol, G.; Roux, J.P.; Ranger, G.

    1987-01-01

    The aim of the pilot plant is the testing of process and equipment in actual conditions with spent fuels on a half-industrial scale and for a significant time. From 1963 to 1983 more than 11t of spent fuels (mainly from fast reactors) were reprocessed. Since 1983 is modernized and enlarged and the new plant of the TOR project (treatment of oxides from fast reactors) are described [fr

  20. Testing of downstream catalysts for tar destruction with a guard bed in a fluidised bed biomass gasifier at pilot plant scale

    Energy Technology Data Exchange (ETDEWEB)

    Aznar, M.P.; Frances, E.; Campos, I.J.; Martin, J.A.; Gil, J. [Saragossa Univ. (Spain). Dept. of Chemistry and Environment Engineering; Corella, J. [Complutense Univ. of Madrid (Spain). Dept. of Chemical Engineering

    1996-12-31

    A new pilot plant for advanced gasification of biomass in a fast fluidised bed is now fully operative at University of Saragossa, Spain. It is a `3rd generation` pilot plant. It has been built up after having used two previous pilot plants for biomass gasification. The main characteristic of this pilot plant is that it has two catalytic reactors connected in series, downstream the biomass gasifier. Such reactors, of 4 cm i.d., are placed in a slip stream in a by-pass from the main gasifier exit gas. The gasification is made at atmospheric pressure, with flow rates of 3-50 kg/in, using steam + O{sub 2} mixtures as the gasifying agent. Several commercial Ni steam-reforming catalyst are being tested under a realistic raw gas composition. Tar eliminations or destructions higher than 99 % are easily achieved. (orig.) 2 refs.

  1. Testing of downstream catalysts for tar destruction with a guard bed in a fluidised bed biomass gasifier at pilot plant scale

    Energy Technology Data Exchange (ETDEWEB)

    Aznar, M P; Frances, E; Campos, I J; Martin, J A; Gil, J [Saragossa Univ. (Spain). Dept. of Chemistry and Environment Engineering; Corella, J [Complutense Univ. of Madrid (Spain). Dept. of Chemical Engineering

    1997-12-31

    A new pilot plant for advanced gasification of biomass in a fast fluidised bed is now fully operative at University of Saragossa, Spain. It is a `3rd generation` pilot plant. It has been built up after having used two previous pilot plants for biomass gasification. The main characteristic of this pilot plant is that it has two catalytic reactors connected in series, downstream the biomass gasifier. Such reactors, of 4 cm i.d., are placed in a slip stream in a by-pass from the main gasifier exit gas. The gasification is made at atmospheric pressure, with flow rates of 3-50 kg/in, using steam + O{sub 2} mixtures as the gasifying agent. Several commercial Ni steam-reforming catalyst are being tested under a realistic raw gas composition. Tar eliminations or destructions higher than 99 % are easily achieved. (orig.) 2 refs.

  2. WIPP conceptual design report. Addendum G. Accident analysis for Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Shefelbine, H.C.; Metcalf, J.H.

    1977-06-01

    The types of accidents or risks pertinent to the Waste Isolation Pilot Plant (WIPP) are presented. Design features addressing these risks are discussed. Also discussed are design features that protect the public

  3. Macroscopic mass and energy balance of a pilot plant anaerobic bioreactor operated under thermophilic conditions.

    Science.gov (United States)

    Espinosa-Solares, Teodoro; Bombardiere, John; Chatfield, Mark; Domaschko, Max; Easter, Michael; Stafford, David A; Castillo-Angeles, Saul; Castellanos-Hernandez, Nehemias

    2006-01-01

    Intensive poultry production generates over 100,000 t of litter annually in West Virginia and 9 x 10(6) t nationwide. Current available technological alternatives based on thermophilic anaerobic digestion for residuals treatment are diverse. A modification of the typical continuous stirred tank reactor is a promising process being relatively stable and owing to its capability to manage considerable amounts of residuals at low operational cost. A 40-m3 pilot plant digester was used for performance evaluation considering energy input and methane production. Results suggest some changes to the pilot plant configuration are necessary to reduce power consumption although maximizing biodigester performance.

  4. Development of a computer systems for operational data acquisition of uranium isotopic enrichment pilot plant

    International Nuclear Information System (INIS)

    Maia, W.M.C.

    1985-01-01

    A pilot plant for uranium enrichment using the jet nozzle process was transfered from Federal Republic of Germany to Brazil, to train Brazilian technicist in its operation and to improve the process. This pilot plant is monitored by a data acquisition system and the possibility of faulty events would cause serious dificulties, as far as maintenance is concerned (for instance, unvailable special components). It is described the development of a new system, which is proposed in order to minimize difficulties with maintenance that utilizes in the assembling integrated circuits of large scale of integration. It is controlled by a microcomputer. (Author) [pt

  5. Decommissioning of an uranium hexafluoride pilot plant

    International Nuclear Information System (INIS)

    Santos, Ivan; Abrao, Alcidio; Carvalho, Fatima M.S.; Ayoub, Jamil M.S.

    2009-01-01

    The Institute of Nuclear and Energetic Researches has completed fifty years of operation, belongs to the National Commission for Nuclear Energy, it is situated inside the city of Sao Paulo. The IPEN-CNEN/SP is a Brazilian reference in the nuclear fuel cycle, researches in this field began in 1970, having dominance in the cycle steps from Yellow Cake to Uranium Hexafluoride technology. The plant of Uranium Hexafluoride produced 35 metric tonnes of this gas by year, had been closed in 1992, due to domain and total transference of know-how for industrial scale, demand of new facilities for the improvement of recent researches projects. The Institute initiates decommissioning in 2002. Then, the Uranium Hexafluoride pilot plant, no doubt the most important unit of the fuel cycle installed at IPEN-CNEN/SP, beginning decommissioning and dismantlement (D and D) in 2005. Such D and D strategies, planning, assessment and execution are described, presented and evaluated in this paper. (author)

  6. Radioactive Waste Treatment and Conditioning Using Plasma Technology Pilot Plant: Testing and Commissioning

    International Nuclear Information System (INIS)

    Rafizi Salihuddin; Rohyiza Baan; Norasalwa Zakaria

    2016-01-01

    Plasma pilot plant was commissioned for research and development program on radioactive waste treatment. The plant is equipped with a 50 kW direct current of non-transferred arc plasma torch which mounted vertically on top of the combustion chamber. The plant also consists of a dual function chamber, a water cooling system, a compress air supply system and a control system. This paper devoted the outcome after testing and commissioning of the plant. The problems arise was discussed in order to find the possible suggestion to overcome the issues. (author)

  7. Effect of heating strategy on power consumption and performance of a pilot plant anaerobic digester.

    Science.gov (United States)

    Espinosa-Solares, Teodoro; Valle-Guadarrama, Salvador; Bombardiere, John; Domaschko, Max; Easter, Michael

    2009-05-01

    The effect of heating strategy on power consumption and performance of a pilot plant anaerobic digester treating chicken litter, under thermophilic conditions, has been studied. Heating strategy was evaluated using three different spans (0.2 degrees C, 0.6 degrees C, and 1.0 degree C) for triggering the temperature control system from target temperature (56.7 degrees C). The hydraulic retention time in the pilot plant digester was in the range of 32 to 37 days, varying the total solids concentration fed from 5% to 6%. The results showed that under the experimental conditions, heating was the most energy-demanding process with 95.5% of the energy used. Increments up to 7.5% and 3.8%, respectively, on mechanical and heating power consumption, were observed as the span, for triggering the temperature control system from target temperature, was increased. Under the experimental conditions studied here, an increment of 30.6% on the global biodigester performance index was observed when a span of 1.0 degree C was compared to the one of 0.2 degrees C.

  8. NPDES Permit for Crow Municipal Rural & Industrial Pilot Water Treatment Plant in Montana

    Science.gov (United States)

    Under NPDES permit MT-0031827, the Crow Indian Tribe is authorized to discharge from the Crow Municipal Rural & Industrial (MR&I) Pilot Water Treatment Plant in Bighorn County, Montana to the Bighorn River.

  9. Waste Isolation Pilot Plant No-migration variance petition. Addendum: Volume 7, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1990-03-01

    This report describes various aspects of the Waste Isolation Pilot Plant (WIPP) including design data, waste characterization, dissolution features, ground water hydrology, natural resources, monitoring, general geology, and the gas generation/test program.

  10. Pilot plant studies on the extraction of antimony metal from lower grade krinj stibnite ore

    International Nuclear Information System (INIS)

    Rehman, W.; Riaz, M.; Ishaq, M.

    2013-01-01

    Antimony is a silvery white, brittle and crystalline solid which is extensively consumed in lead acid batteries, antimonial lead alloys, flame retardants and a variety of metallic products. The antimony content of commercial ores range from 5-60% and determines the method of extraction, either pyrometallurgical or hydrometallurgical. The present study focuses on pilot plant scale extraction of antimony metal from lower grade stibnite ore of Krinj (Chitral) without the use of iron scrap, thus eliminating the second step of iron removal in conventional direct reduction method. A tilting gas fired furnace with digital temperature control system and a heat recuperator was designed to optimize the operating parameters for extraction of antimony metal. Weight ratios of flux and reductant, operating time and operating temperature were optimized. Highest percentage recovery and purity were achieved using soda ash as a flux, at a temperature of 900 degree C for 2 hours. (author)

  11. Radiation treatment of sewage sludge - experience with an operating pilot plant

    International Nuclear Information System (INIS)

    Suess, A.; Lessel, T.

    1977-01-01

    After an operation time of a pilot plant for the γ-irradiation of sewage sludge after 3 years promising results could be obtained for economic considerations, killing rate of pathogenes and radiation induced changes in sedimentation properties. Irradiated sewage sludge indicated nearly the same effect on soil and plant as untreated. No special trained personnel are necessary for maintenance because of the simple design. Successful experience during 18 months resulted in an increase of the daily capacity up to 120 m 3 from December 1975. (author)

  12. The Importance of Pilot Studies

    OpenAIRE

    Van Teijlingen, Edwin; Hundley, Vanora

    2001-01-01

    The term 'pilot studies' refers to mini versions of a full-scale study (also called 'feasibility' studies), as well as the specific pre-testing of a particular research instrument such as a questionnaire or interview schedule. \\ud Pilot studies are a crucial element of a good study design. Conducting a pilot study does not guarantee success in the main study, but it does increase the likelihood. \\ud Pilot studies fulfil a range of important functions and can provide valuable insights for othe...

  13. Use of Pilot Plants for Developing Used Nuclear Fuel Recycling Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Chris; Arm, Stuart [EnergySolutions LLC (United States); Banfield, Zara; Jeapes, Andrew; Taylor, Richard [National Nuclear Laboratory (United Kingdom)

    2009-06-15

    EnergySolutions and its teaming partners are working with the US Department of Energy (DOE) to develop processes, equipment and facilities for recycling used nuclear fuel (UNF). Recycling significantly reduces the volume of wastes that ultimately will be consigned to the National Geologic Repository, enables the re-use in new fuel of the valuable uranium and plutonium in the UNF, and allows the long-lived minor actinides to be treated separately so they do not become long term heat emitters in the Repository. A major requirement of any new UNF recycling facility is that pure plutonium is not separated anywhere in the process, so as to reduce the nuclear proliferation attractiveness of the facility. EnergySolutions and its team partner the UK National Nuclear Laboratory (NNL) have developed the NUEX process to achieve this and to handle appropriately the treatment of other species such as krypton, tritium, neptunium and technetium. NUEX is based on existing successful commercial UNF recycling processes deployed in the UK, France and imminently in Japan, but with a range of modifications to the flowsheet to keep some uranium with the plutonium at all times and to minimize aerial and liquid radioactive discharges. NNL's long-term experience in developing the recycling and associated facilities at the Sellafield site in the UK, and its current duties to support technically the operation of the Thermal Oxide Reprocessing Plant (THORP) at Sellafield provides essential input to the design of the US NUEX-based facility. Development work for THORP and other first-of-kind nuclear plants employed miniature scale fully radioactive through large scale inactive pilot plants. The sequence of development work that we have found most successful is to (i) perform initial process development at small (typically 1/5000) scale in gloveboxes using trace active materials, (ii) demonstrate the processes at the same small scale with actual irradiated fuel in hot cells and (iii

  14. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services (WRES)

    2004-10-25

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

  15. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    2004-01-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

  16. Separation of packaging plastics by froth flotation in a continuous pilot plant

    International Nuclear Information System (INIS)

    Carvalho, Teresa; Durao, Fernando; Ferreira, Celia

    2010-01-01

    The objective of the research was to apply froth flotation to separate post-consumer PET (Polyethylene Terephthalate) from other packaging plastics with similar density, in a continuously operated pilot plant. A representative sample composed of 85% PET, 2.5% PVC (Polyvinyl Chloride) and 11.9% PS (Polystyrene) was subjected to a combination of alkaline treatment and surfactant adsorption followed by froth flotation. A mineral processing pilot plant, owned by a Portuguese mining company, was adapted for this purpose. The experimentation showed that it is possible to produce an almost pure concentrate of PET, containing 83% of the PET in feed, in a single bank of mechanical flotation cells. The concentrate grade attained was 97.2% PET, 1.1% PVC and 1.1% PS. By simulation it was shown that the Portuguese recycling industry specifications can be attained if one cleaning and one scavenger stages are added to the circuit.

  17. Conceptual design of SO3 decomposer for thermo-chemical iodine-sulfur process pilot plant

    International Nuclear Information System (INIS)

    Akihiro Kanagawa; Seiji Kasahara; Atsuhiko Terada; Shinji Kubo; Ryutaro Hino; Yoshiyuki Kawahara; Masaharu Watabe; Hiroshi Fukui; Kazuo Ishino; Toshio Takahashi

    2005-01-01

    Thermo-chemical water-splitting cycle is a method to make an effective use of the high temperature nuclear heat for hydrogen production. Japan Atomic Energy Research Institute (JAERI) has been conducting R and D on HTGR and also on thermo-chemical hydrogen production by using a thermo-chemical iodine-sulfur cycle (IS process). Based on the test results and know-how obtained through a bench-scale tests of hydrogen production of about 30 NL/hr, JAERI has a plan to construct a pilot test plant heated by high temperature helium gas, which has a hydrogen production performance of 30 Nm 3 /hr and will be operated under the high pressure up to 2 MPa. One of the key components of the pilot test plant is a SO 3 decomposer under high temperature conditions up to 850 degree C and high pressure up to 2 MPa. In this paper, a concept of the SO 3 decomposer for the pilot test plant fabricated with SiC ceramics, a corrosion-resistant material is investigated. Preliminary analyses on temperature and flow-rate distributions in the SO 3 decomposer and on thermal stress were carried out. A SO 3 decomposer model was experimentally manufactured. (authors)

  18. Remote maintenance demonstration tests at a pilot plant for high level waste vitrification

    International Nuclear Information System (INIS)

    Selig, M.

    1984-01-01

    The remote maintenance and replacement technique designed for a radioactive vitrification plant have been developed and tested in a full scale handling mockup and in an inactive pilot plants by the Central Engineering Department of the Karlsruhe Nuclear Research Center. As a result of the development work and the tests it has been proved that the remote maintenance technique and remote handling equipment can be used without any technical problems and are suited for application in a radioactive waste vitrification plant

  19. Report on 1979 result of Sunshine Project (detailed design). Part 1. Forty t/day solvolysis coal liquefaction pilot plant; 1979 nendo 40T/nichi solvolysis sekitan pilot plant shosai sekkei. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    The subject design documents are the compilation of the result of the design operation for the 'detailed design of 40 t/day class solvolysis coal liquefaction pilot plant'. The design of this pilot plant was conducted using, as the fundamental reference, the basic data provided by Kyushu National Industrial Research Institute and Kyushu University and the results of a contract research on '1 t/day class solvolysis coal liquefaction plant'. The subject detailed design was intended for Phase 1 centering on a single stage liquefaction - coal liquefaction (transformation into pitch) by solvolysis liquefaction reaction. The areas covered consists of the pre-treatment process, material mixing process, reaction process, reaction freezing process, coke separation process, SR recovery process, pitch refining process, utility facilities, and waste water treatment facilities. Incidentally, the processes for which the design operation has been completed this year, particularly the reaction process, coke separation process, SR recovery process, etc., are in the field untrodden technologically in the world; therefore, their design method is supposed to be established from the results of the R and D on coal liquefaction, '1 t/day class solvolysis coal liquefaction plant.' (NEDO)

  20. Report on 1979 result of Sunshine Project (detailed design). Part 1. Forty t/day solvolysis coal liquefaction pilot plant; 1979 nendo 40T/nichi solvolysis sekitan pilot plant shosai sekkei. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    The subject design documents are the compilation of the result of the design operation for the 'detailed design of 40 t/day class solvolysis coal liquefaction pilot plant'. The design of this pilot plant was conducted using, as the fundamental reference, the basic data provided by Kyushu National Industrial Research Institute and Kyushu University and the results of a contract research on '1 t/day class solvolysis coal liquefaction plant'. The subject detailed design was intended for Phase 1 centering on a single stage liquefaction - coal liquefaction (transformation into pitch) by solvolysis liquefaction reaction. The areas covered consists of the pre-treatment process, material mixing process, reaction process, reaction freezing process, coke separation process, SR recovery process, pitch refining process, utility facilities, and waste water treatment facilities. Incidentally, the processes for which the design operation has been completed this year, particularly the reaction process, coke separation process, SR recovery process, etc., are in the field untrodden technologically in the world; therefore, their design method is supposed to be established from the results of the R and D on coal liquefaction, '1 t/day class solvolysis coal liquefaction plant.' (NEDO)

  1. Methodological approaches to conducting pilot and proof tests on reverse-osmosis systems: Results of comparative studies

    Science.gov (United States)

    Panteleev, A. A.; Bobinkin, V. V.; Larionov, S. Yu.; Ryabchikov, B. E.; Smirnov, V. B.; Shapovalov, D. A.

    2017-10-01

    When designing large-scale water-treatment plants based on reverse-osmosis systems, it is proposed to conduct experimental-industrial or pilot tests for validated simulation of the operation of the equipment. It is shown that such tests allow establishing efficient operating conditions and characteristics of the plant under design. It is proposed to conduct pilot tests of the reverse-osmosis systems on pilot membrane plants (PMPs) and test membrane plants (TMPs). The results of a comparative experimental study of pilot and test membrane plants are exemplified by simulating the operating parameters of the membrane elements of an industrial plant. It is concluded that the reliability of the data obtained on the TMP may not be sufficient to design industrial water-treatment plants, while the PMPs are capable of providing reliable data that can be used for full-scale simulation of the operation of industrial reverse-osmosis systems. The test membrane plants allow simulation of the operating conditions of individual industrial plant systems; therefore, potential areas of their application are shown. A method for numerical calculation and experimental determination of the true selectivity and the salt passage are proposed. An expression has been derived that describes the functional dependence between the observed and true salt passage. The results of the experiments conducted on a test membrane plant to determine the true value of the salt passage of a reverse-osmosis membrane are exemplified by magnesium sulfate solution at different initial operating parameters. It is shown that the initial content of a particular solution component has a significant effect on the change in the true salt passage of the membrane.

  2. LEU fuel element produced by the Egyptian fuel manufacturing pilot plant

    International Nuclear Information System (INIS)

    Zidan, W.I.

    2000-01-01

    The Egyptian Fuel Manufacturing Pilot Plant, FMPP, is a Material Testing Reactor type (MTR) fuel element facility, for producing the specified fuel elements required for the Egyptian Second Research Reactor, ETRR-2. The plant uses uranium hexafluoride (UF 6 , 19.75% U 235 by wt) as a raw material which is processed through a series of the manufacturing, inspection and test plan to produce the final specified fuel elements. Radiological safety aspects during design, construction, operation, and all reasonably accepted steps should be taken to prevent or reduce the chance of accidents occurrence. (author)

  3. Radioactive waste disposal: Waste isolation pilot plants (WIPP). (Latest citations from the NTIS Bibliographic database). Published Search

    International Nuclear Information System (INIS)

    1993-09-01

    The bibliography contains citations concerning the Waste Isolation Pilot Plant (WIPP), a geologic repository located in New Mexico for transuranic wastes generated by the U.S. Government. Articles follow the development of the program from initial site selection and characterization through construction and testing, and examine research programs on environmental impacts, structural design, and radionuclide landfill gases. Existing plants and facilities, pilot plants, migration, rock mechanics, economics, regulations, and transport of wastes to the site are also included. The Salt Repository Project and the Crystalline Repository Project are referenced in separate bibliographies. (Contains a minimum of 228 citations and includes a subject term index and title list.)

  4. Final environmental impact statement. Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described

  5. Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Demuth, Scott Francis [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sprinkle, James K. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-26

    As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout of Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.

  6. Multi-Pollutant Emissions Control: Pilot Plant Study of Technologies for Reducing Hg, SO3, NOx and CO2 Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Michael L. Fenger; Richard A. Winschel

    2005-08-31

    A slipstream pilot plant was built and operated to investigate technology to adsorb mercury (Hg) onto the existing particulate (i.e., fly ash) by cooling flue gas to 200-240 F with a Ljungstrom-type air heater or with water spray. The mercury on the fly ash was then captured in an electrostatic precipitator (ESP). An alkaline material, magnesium hydroxide (Mg(OH){sub 2}), is injected into flue gas upstream of the air heater to control sulfur trioxide (SO{sub 3}), which prevents acid condensation and corrosion of the air heater and ductwork. The slipstream was taken from a bituminous coal-fired power plant. During this contract, Plant Design and Construction (Task 1), Start Up and Maintenance (Task 2), Baseline Testing (Task 3), Sorbent Testing (Task 4), Parametric Testing (Task 5), Humidification Tests (Task 6), Long-Term Testing (Task 7), and a Corrosion Study (Task 8) were completed. The Mercury Stability Study (Task 9), ESP Report (Task 11), Air Heater Report (Task 12) and Final Report (Task 14) were completed. These aspects of the project, as well as progress on Public Outreach (Task 15), are discussed in detail in this final report. Over 90% mercury removal was demonstrated by cooling the flue gas to 200-210 F at the ESP inlet; baseline conditions with 290 F flue gas gave about 26% removal. Mercury removal is sensitive to flue gas temperature and carbon content of fly ash. At 200-210 F, both elemental and oxidized mercury were effectively captured at the ESP. Mg(OH){sub 2} injection proved effective for removal of SO{sub 3} and eliminated rapid fouling of the air heater. The pilot ESP performed satisfactorily at low temperature conditions. Mercury volatility and leaching tests did not show any stability problems. No significant corrosion was detected at the air heater or on corrosion coupons at the ESP. The results justify larger-scale testing/demonstration of the technology. These conclusions are presented and discussed in two presentations given in July and

  7. Temperature Profile Measurements in a Newly Constructed 30-Stage 5 cm Centrifugal Contactor Pilot Plant

    International Nuclear Information System (INIS)

    Garn, Troy G.; Meikrantz, Dave H.; Greenhalgh, Mitchell R.; Law, Jack D.

    2008-01-01

    An annular centrifugal contactor pilot plant incorporating 30 stages of commercial 5 cm CINC V-02 units has been built and operated at INL during the past year. The pilot plant includes an automated process control and data acquisitioning system. The primary purpose of the pilot plant is to evaluate the performance of a large number of inter-connected centrifugal contactors and obtain temperature profile measurements within a 30-stage cascade. Additional solvent extraction flowsheet testing using stable surrogates is also being considered. Preliminary hydraulic testing was conducted with all 30 contactors interconnected for continuous counter-current flow. Hydraulic performance and system operational tests were conducted successfully but with higher single-stage rotor speeds found necessary to maintain steady interstage flow at flowrates of 1 L/min and higher. Initial temperature profile measurements were also completed in this configuration studying the performance during single aqueous and two-phase counter-current flow at ambient and elevated inlet solution temperatures. Temperature profile testing of two discreet sections of the cascade required additional feed and discharge connections. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 were the solution feeds for all the testing described in this report. Numerous temperature profiles were completed using a newly constructed 30-stage centrifugal contactor pilot plant. The automated process control and data acquisition system worked very well throughout testing. Temperature data profiles for an array of total flowrates (FT) and contactor rpm values for both single-phase and two-phase systems have been collected with selected profiles and comparisons reported. Total flowrates (FT) ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Solution inlet temperatures ranging from ambient up to 50 C were tested. Ambient temperature testing shows that a small

  8. FY 1994 report on the results of the project supplementary to the New Sunshine Project - Development of the coal utilization hydrogen production technology. Ninth year - Part 2. Study using a pilot plant (Design/construction/operation study of the pilot plant and the dismantling study); 1994 nendo New Sunshine keikaku hojo jigyo Dai 9 nenji bun seika hokokusho - 2. Sekitan riyo suiso seizo gijutsu kaihatsu - Pilot plant ni yoru kenkyu (Pilot plant no sekkei kensetsu unten kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    In the R and D of the high temperature coal gasification technology by the entrained bed system which is the core technology of the coal utilization hydrogen production technology, the paper carried out the dismantling study of pilot plant and the summarization of the results. About the summarization of the results, as the results of the HYCOL operation study, there were insufficiencies in expansion of the coal kind used and acquisition of scale-up data, but it was verified that the conceptual design of the HYCOL method was fully applicable to the higher gasification efficiency, higher reliability, adaptability to many kinds of coal and compactness of facilities (low construction cost) which were the final subjects for the realization of commercial plant. This was highly evaluated. Especially, the greatest characteristic of the HYCOL method is the freedom in selection of temperature difference between the upper stage and lower stage, that is, temperatures can be controlled to temperatures they want in each of the upper stage and lower stage in the one-chamber gasifier according to coal properties and slagging control. The verification of this freedom was the base of the total results. Moreover, a reputation was being made that the gasification efficiency and process reliability are at the world's highest level. (NEDO)

  9. Synthesis in pilot plant scale and physical properties of sulfonated polystyrene

    Directory of Open Access Journals (Sweden)

    Martins Cristiane R.

    2003-01-01

    Full Text Available The homogenous sulfonation of polystyrene was developed in a pilot plant scale producing polymers with different sulfonation degrees (18 to 22 mole % of sulfonated styrene units. The reaction yield depends chiefly on the concentration ratio of acetyl sulfate and polystyrene. The morphological and thermal properties of the sulfonated polystyrene obtained by homogeneous sulfonation were studied by means of scanning electron microscopy, differential scanning calorimetry and thermogravimetry. The glass transition temperature of sulfonated polystyrene increases in relation to pure polystyrene and DCp was evaluated in order to confirm the strong interactions among the ~SO3H groups.

  10. Desind an operation of pilot plant production of biodisel fron frying oils

    Directory of Open Access Journals (Sweden)

    Nelly Morales Pedraza

    2008-06-01

    Full Text Available The objective of this article is present the pilot plant used in the research titled: Production of biodiesel from used edible oils to industrial level for the production of methyl or ethyl esters from vegetable oils used in the food industry that be used as a fuel in diesel engines type, in order to generate alternative use for these oils are reused, and additionally, generate new options in biofuels that can replace methyl ester, since these need of methanol, a product that usually is a derived petrochemical and highly toxic. In this small-scale plant for the production of ethyl esters (biodiesel can be evaluated spent oils of different kinds and diverse origin, or study oils from food industries, which are usually a blend of palm oil and soybean oil, and other times palm oils hydrogenated or mixtures of oil spent with palm oil refning RBD (refned, bleached and deodorized. The results are the basis for the design and construction of a pilot plant to produce biodiesel by lot of 6 liter by hour approximately, which is evaluated under simulated conditions of loading and operation. It was designed and implemented a batch reactor with heating and stirring mechanics, drivers with temperature, condensation and total alcohol refux, maintaining a molar relationship of 6:1 (alcohol/oil, which is considered the best relation for a esterification with basic catalysis several scientifc publications. The temperature of the reaction is set at 60 °C and atmospheric pressure. The productivity of the reaction

  11. Waste Isolation Pilot Plant Safety Analysis Report

    International Nuclear Information System (INIS)

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions'' (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.'' This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment

  12. Waste Isolation Pilot Plant Safety Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

  13. Understanding and Modelling the Effect of Dissolved Metals on Solvent Degradation in Post Combustion CO2 Capture Based on Pilot Plant Experience

    Directory of Open Access Journals (Sweden)

    Sanjana Dhingra

    2017-05-01

    Full Text Available Oxidative degradation is a serious concern for upscaling of amine-based carbon capture technology. Different kinetic models have been proposed based on laboratory experiments, however the kinetic parameters included are limited to those relevant for a lab-scale system and not a capture plant. Besides, most of the models fail to recognize the catalytic effect of metals. The objective of this work is to develop a representative kinetic model based on an apparent auto-catalytic reaction mechanism between solvent degradation, corrosion and ammonia emissions. Measurements from four different pilot plants: (i EnBW’s plant at Heilbronn, Germany (ii TNO’s plant at Maasvlakte, The Netherlands; (iii CSIRO’s plants at Loy Yang and Tarong, Australia and (iv DONG Energy’s plant at Esbjerg, Denmark are utilized to propose a degradation kinetic model for 30 wt % ethanolamine (MEA as the capture solvent. The kinetic parameters of the model were regressed based on the pilot plant campaign at EnBW. The kinetic model was validated by comparing it with the measurements at the remaining pilot campaigns. The model predicted the trends of ammonia emissions and metal concentration within the same order of magnitude. This study provides a methodology to establish a quantitative approach for predicting the onset of unacceptable degradation levels which can be further used to devise counter-measure strategies such as reclaiming and metal removal.

  14. WIPP conceptual design report. Addendum C. Cost worksheets for Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1977-04-01

    The cost worksheets for the Waste Isolation Pilot Plant (WIPP) are presented. A summary cost estimate, cost estimate for surface facilities, and cost estimate for shafts and underground facilities are included

  15. Pilot plant experiments at Wairakei Power Station

    International Nuclear Information System (INIS)

    Brown, Kevin L.; Bacon, Lew G.

    2009-01-01

    In the mid-1990s, several pilot plants were constructed at Wairakei to either improve the operational and economic performance of the power station or to mitigate the environmental effects of discharges to the Waikato River. The results of the following investigations are discussed: (1) fluid flow dynamic effects on silica scaling; (2) production of silica sols of predetermined particle size to evaluate the potential for generating commercial grade silica products; (3) use of 'sulfur oxidising bacteria' for the abatement of dissolved hydrogen sulphide in cooling water; (4) removal of arsenic from separated geothermal water; (5) steam line condensate corrosion; and (6) measurement and modelling of steam scrubbing in Wairakei's long steamlines. (author)

  16. The dispersal and impact of salt from surface storage piles the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Reith, C.C.; Louderbough, E.T.

    1986-01-01

    A comprehensive program of ecological studies occurs at the Waste Isolation Pilot Plant (WIPP) in an effort to detect and quantify impacts of excavated salt which is stored on the surface in two piles: one having originated in 1980, the other in 1984. Both piles are surrounded by berms which channel runoff to holding ponds, so nearly all dispersal is due to the resuspension, transport, and deposition of salt particles by wind. Ecological parameters which have been monitored since 1984 include: visual evidence (via photography), soil properties, microbial activity, leaf-litter decomposition, seedling emergence, plant foliar cover, and plant species diversity. These are periodically assessed at experimental plots near the salt piles, and at control plots several kilometers away

  17. Not-from-concentrate pilot plant ‘Wonderful’ cultivar pomegranate juice changes: Volatiles

    Science.gov (United States)

    Pilot plant ultrafiltration was used to mimic the dominant U.S. commercial pomegranate juice extraction method (hydraulic pressing whole fruit), to deliver a not-from-concentrate (NFC) juice that was high-temperature short-time pasteurized and stored at 4 and 25 °C. Recovered were 46 compounds, of ...

  18. The waste isolation pilot plant regulatory compliance program

    International Nuclear Information System (INIS)

    Mewhinney, J.A.; Kehrman, R.F.

    1996-01-01

    The passage of the WIPP Land Withdrawal Act of 1992 (LWA) marked a turning point for the Waste Isolation Pilot Plant (WIPP) program. It established a Congressional mandate to open the WIPP in as short a time as possible, thereby initiating the process of addressing this nation's transuranic (TRU) waste problem. The DOE responded to the LWA by shifting the priority at the WIPP from scientific investigations to regulatory compliance and the completion of prerequisites for the initiation of operations. Regulatory compliance activities have taken four main focuses: (1) preparing regulatory submittals; (2) aggressive schedules; (3) regulator interface; and (4) public interactions

  19. Seismic reflection data report: Waste Isolation Pilot Plant (WIPP) site, Southeastern New Mexico

    International Nuclear Information System (INIS)

    Hern, J.L.; Powers, D.W.; Barrows, L.J.

    1978-12-01

    Volume II contains uninterpreted processed lines and shotpoint maps from three seismic reflection surveys conducted from 1976 through 1978 by Sandia Laboratories to support investigations for the Waste Isolation Pilot Plant. Data interpretations will be the subject of subsequent reports

  20. Study of radiation processes for purifying liquid effluent and the design of pilot plants

    International Nuclear Information System (INIS)

    Kon'kov, N.G.; Buslaeva, S.P.; Osipov, V.B.; Panin, Yu.A.; Solodikhina, L.D.; Upadyshev, L.B.; Karpukhin, V.F.; Fajngol'd, Z.L.

    1975-01-01

    The possibilities of purifying liquid effluent containing dyestuffs and various organic and biological pollutants with an accelerated electron beam of energy up to 0.7 MeV are examined. A laboratory plant has been erected for the stationary, continuous irradiation - with bubbling of air - of artificial and natural industrial effluent containing organic pollutants in concentrations of up to 2g/litre and the 5 SKh dye in concentrations of up to 220 mg/litre. The results are discussed of the experimental irradiation of artificial mixtures consisting of distilled water, organic pollutants and dyestuffs, and also of natural industrial effluents from an enterprise where antibiotics are produced and from textile mills. The results of the studies indicate that the physicochemical characteristics of effluents are improved. On the basis of these studies pilot plants with electron accelerators are being designed for a daily throughput of 15 000 m 3 of effluent from the production of antibiotics. The electron accelerators are of the transformer type (EhLV-1) with an energy of up to 0.7 MeV and a power of up to 40 kW. In addition, units with a daily throughput of 200 m 3 are being designed for the breakdown of cyanides in effluent by 60 Co. Such a unit consists of three reactors with centro-axial irradiators and solid cast-iron biological shielding. The dose-rate can be measured over a wide range, thanks to the use of spherical source holders. The sources have a total activity of 62 kCi. Calculations of the cost of the radiation treatment of effluent demonstrate the economic feasibility of the method

  1. Fiscal 1995 achievement report. Development of entrained bed coal gasification power plant (Part 4 - Pilot plant operation); 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The 200 tons/day entrained bed coal gasification pilot plant constructed for establishing the technology of integrated coal gasification combined cycle was subjected to operational tests, and the fiscal 1995 results are compiled. In fiscal 1995, 1328 hours and 3 minutes (8 gasification operations) was recorded with gasification furnace facility, 899 hours and 53 minutes with the gas clean-up facility, 831 hours and 27 minutes with the gas turbine facility (11 startups for the generation of 6657 MWh), and 1958 hours and 2 minutes with the treatment furnace and 1331 hours and 10 minutes with the denitration unit of the safety/environment-related facility. The details of starts and stops were described in graphs which covered Runs D13, D14-1, D14-2, E1, D15, and A14. Operating procedures were studied and compiled for the plant start/stop schedule, general guidelines, gasification furnace facility, gas clean-up facility (dry type desulfurization facility), gas clean-up facility (dry type dedusting facility), gas turbine facility, real-pressure natural-size combustor test facility, and the safety/environment-related facility. (NEDO)

  2. FY 1993 report on the results of the subsidy project for the Sunshine Project. Development of coal use hydrogen production technology (Support study of pilot plant - Trial development of materials of plant use equipment); 1993 nendo Sunshine keikaku hojo jigyo seika hokokusho. Sekitan riyo suiso seizo gijutsu kaihatsu - Pilot plant no shien kenkyu (Plant yo kiki zairyo no shisaku kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    As to the development of coal use hydrogen production technology, the paper made the test study on the improvement of gasifier use materials and evaluation of the characteristics, the evaluation test in the environment using the actual machine, etc., and the FY 1993 results were reported. The results of the study were as follows. Concerning the shaped refractory for gasifier hearth, it was found that high chromia base and picrochromite base refractory development materials had much more excellent coal slag resistance than other existing component-system materials. It was shown that the development materials began to deteriorate under the coal gasification environment at temperatures of about 1,500 degrees C or higher. As to the mullite ceramics, a possibility was shown of improving the slag permeation resistance by making the crystal grain coarse by long-time sintering. By the survey of the state of damage of the proposed materials (refractory and iridium) used in the operational environment of the pilot plant, the outlook for use limit was made clear. In the environment test using the actual machine on the proposed metal base alloy of the typical equipment of the pilot plant, the correspondence between the operational environment and material corrosion was made clear. (NEDO)

  3. Continuous operation of a pilot plant for the production of beryllium oxide

    International Nuclear Information System (INIS)

    Costa, T.C.; Amaral, S.; Silveira, C.M.S.; Oliveira, A.P. de

    1975-01-01

    A method of obtaining beryllium oxide with a purity of 99,2% was developed in a pilot plant with a capacity of 7 tons per month destined to operate continuously. The operation market prospects and control of production with the objective of obtaining internacional technical grade beryllium oxide are discussed [pt

  4. Continuous operation of a pilot plant for the production of beryllium oxide

    Energy Technology Data Exchange (ETDEWEB)

    Costa, T C; Amaral, S; Silveira, C M.S.; de Oliveira, A P [Instituto de Tecnologia, Governador Valadares (Brazil)

    1975-12-01

    A method of obtaining beryllium oxide with a purity of 99,2% was developed in a pilot plant with a capacity of 7 tons per month destined to operate continuously. The operation market prospects and control of production with the objective of obtaining internacional technical grade beryllium oxide are discussed.

  5. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  6. Retrieval of canistered experimental waste at the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Stinebaugh, R.E.

    1979-07-01

    To assess the suitability of bedded salt for nuclear waste disposal, an extensive experimental program will be implemented at the Waste Isolation Pilot Plant. In order to evaluate experimental results, it will be necessary to recover certain of these experiments for postmortem examination and analysis. This document describes the equipment and procedures used to effect recovery of one category of WIPP experiments

  7. Sono-photo-degradation of carbamazepine in a thin falling film reactor: Operation costs in pilot plant.

    Science.gov (United States)

    Expósito, A J; Patterson, D A; Monteagudo, J M; Durán, A

    2017-01-01

    The photo-Fenton degradation of carbamazepine (CBZ) assisted with ultrasound radiation (US/UV/H 2 O 2 /Fe) was tested in a lab thin film reactor allowing high TOC removals (89% in 35min). The synergism between the UV process and the sonolytic one was quantified as 55.2%. To test the applicability of this reactor for industrial purposes, the sono-photo-degradation of CBZ was also tested in a thin film pilot plant reactor and compared with a 28L UV-C conventional pilot plant and with a solar Collector Parabolic Compound (CPC). At a pilot plant scale, a US/UV/H 2 O 2 /Fe process reaching 60% of mineralization would cost 2.1 and 3.8€/m 3 for the conventional and thin film plant respectively. The use of ultrasound (US) produces an extra generation of hydroxyl radicals, thus increasing the mineralization rate. In the solar process, electric consumption accounts for a maximum of 33% of total costs. Thus, for a TOC removal of 80%, the cost of this treatment is about 1.36€/m 3 . However, the efficiency of the solar installation decreases in cloudy days and cannot be used during night, so that a limited flow rate can be treated. Copyright © 2016 Elsevier B.V. All rights reserved.

  8. The Planning of a Small Pilot Plant for Development Work on Aqueous Reprocessing of Nuclear Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Sjoeborg, T U; Haeffner, E; Hultgren, Aa

    1963-10-15

    A shielded volume (42 m{sup 3}) in the hot laboratory at Kjeller, Norway, has been used for the installation of a small pilot plant intended for studies on nuclear fuel reprocessing. During the first period of operation (1963) a plutonium separation method (the Silex process) developed at AB Atomenergi will be studied. This document is a description of the project during the stage of technical planning and chemical process development.

  9. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  10. The design of a modular pilot plant based on the adsorber loop concept

    International Nuclear Information System (INIS)

    Koske, P.H.; Ohlrogge, K.

    1984-01-01

    The main design criteria for a pilot plant producing about 100 t uranium per year from seawater are discussed. The application of the ''adsorber loop concept'' for the contact between seawater and the adsorber granulate enables the employment of high seawater velocities. The seawater flow is accomplished by active pumping and the plant is supposed to be operating far from shores. Besides some informations on the theoretical background the essential engineering considerations are presented. (orig.) [de

  11. Experimental Investigation and Modelling of a Wet Flue Gas Desulphurisation Pilot Plant

    DEFF Research Database (Denmark)

    Kiil, Søren; Michelsen, Michael Locht; Dam-Johansen, Kim

    1998-01-01

    A detailed model for a wet flue gas desulphurisation (FGD) pilot plant, based on the packed tower concept, has been developed. All important rate determining steps, absorption of SO2, oxidation of HSO3-, dissolution of limestone, and crystallisation of gypsum were included. Population balance...... equations, governing the description of particle size distributions of limestone in the plant, were derived. Model predictions were compared to experimental data such as gas phase concentration profiles of SO2, slurry pH-profiles, solids content of the slurry, liquid phase concentrations, and residual...

  12. A shaft seal system for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Hansen, F.D.; Ahrens, E.H.; Dennis, A.W.; Hurtado, L.D.; Knowles, M.K.; Tillerson, J.R.; Thompson, T.W.; Galbraith, D.

    1996-01-01

    As part of the demonstration of compliance with federal regulations, a shaft seal system has been designed for the Waste Isolation Pilot Plant. The system completely fills the 650 m shafts with components consisting of the common engineering materials, each of which possesses low permeability, longevity, and can be constructed using available technology. Design investigations couple rock mechanics and fluid flow analysis and tests of these materials within the natural geological setting, and demonstrate the effectiveness of the design

  13. Site selection and evaluation studies of the Waste Isolation Pilot Plant (WIPP), Los Medanos, Eddy County, NM

    International Nuclear Information System (INIS)

    Griswold, G.B.

    1977-12-01

    Bedded-salt deposits of the Salado Formation have been selected for evaluation for a proposed Waste Isolation Pilot Plant (WIPP) to be located in Eddy County, NM, approximately 26 mi east of Carlsbad. Site selection and evaluation studies that included geologic mapping, geophysical surveys, drilling, and resource appraisal were conducted over and under the prospective location. The lower portion of the Salado meets essential criteria for waste isolation. Beds chosen for waste storage lie 2074 to 2730 ft below the surface. High-purity salt exists at these depths, and the geologic structure revealed by geophysical surveys indicates that these beds are essentially flat. Additional geophysical surveys are now under way. The initial interpretation of the new data indicates that more structure may exist in the salt beds in the northern portion of the site area. Full evaluation of potentially commercial deposits of potash and natural gas within the WIPP site will be reported by separate studies, as will be the hydrologic details of the region

  14. Fiscal 1995 achievement report. Development of entrained bed coal gasification power plant (Part 5 - Surveys and studies of demonstration plant); 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 5. Jissho plant ni kansuru chosa kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Surveys and studies were conducted concerning a demonstration plant for establishing the technology of integrated coal gasification combined cycle, and the fiscal 1995 results are compiled. In this fiscal year, a demonstration plant conceptual design was prepared for assuring smooth transition from a pilot plant to a commercial plant. The design followed the system employed at the Nakoso pilot plant for its gasification power generation. It was decided that the gasification furnace be of the air-blown (oxygen enriched) 2-stage entrained bed type, that the desulfurization system be of the dry type 2-stage fluidized bed type, the dedusting system be of the dry type granular bed type (moving bed type), that the combined cycle power facility be derived from the commercialized gas turbine, and that the cycle of the steam system agree with the integrated coal gasification combined cycle system now under discussion. Studies were made, which covered heat efficiency (generating end/sending end), heat/matter balance, process flow, gas turbine/steam system optimization, comparison in performance with a pilot plant with its dimensions increased, estimation of the performance of each of the facilities, estimation of the construction cost, calculation of the generation cost, environmental friendliness, operating characteristics, acceptable coal types, and the like. (NEDO)

  15. Drying and purification of natural gas by clinoptilolite on an experimental pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Tsitsishvili, G V; Urotadze, S L; Lukin, V D; Bagirov, R M

    1976-02-01

    The paper deals with the process of the drying and purification of natural gas from CO/sub 2/ on an experimental pilot plant using the natural zeolite clinoptilolite. On the basis of the obtained data the dynamic activity of clinoptilolite against water and CO/sub 2/ has been calculated.

  16. Pasteurization of strawberry puree using a pilot plant pulsed electric fields (PEF) system

    Science.gov (United States)

    The processing of strawberry puree by pulsed electric fields (PEF) in a pilot plant system has never been evaluated. In addition, a method does not exist to validate the exact number and shape of the pulses applied during PEF processing. Both buffered peptone water (BPW) and fresh strawberry puree (...

  17. Achievement report for fiscal 1982 on Sunshine Program. Research and development of coal liquefaction technology (Conceptual designs for coal liquefaction pilot plants - Solvent extraction liquefaction process); 1982 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika hokokusho. Sekitan ekika pilot plant no gainen sekkei (yozai chushutsu ekikaho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    This research aims to prepare conceptual designs for a 250t/d-class and 500t/d-class coal liquefaction pilot plants based on the achievement of research on solvent extraction liquefaction of coal. It also aims to define the solvent extraction process and provide decision-making material relative to the development and promotion of coal liquefaction technologies in the future. Development started in 1978 of the technology of solvent extraction liquefaction of coal, and a 1t/d PDU (process development unit) was completed in 1981. Studies through its operation have continued for more than 3000 hours already, and technical data are being accumulated steadily. Techniques acquired through operating the 1t/d PDU have been put together, and rough process conditions are established. A rough process result is achieved of the same conditions. In these two respects, the newly developed process is equal to other processes. The phenomena in this process are roughly grasped. It is deemed that, with the existing technique combined with the technique acquired here, a technological level has been reached where conceptual designs of large pilot plants may be worked out for solvent extraction liquefaction of coal. Under the circumstances, with a view to developing a commercial plant whose main products will be fuel oils, conceptual designs are prepared for large pilot plants, and are compiled into this report. (NEDO)

  18. Effects of foaming and antifoaming agents on the performance of a wet flue gas desulfurization pilot plant

    DEFF Research Database (Denmark)

    Qin, Siqiang; Hansen, Brian Brun; Kiil, Søren

    2014-01-01

    Foaming is a common phenomenon in industrial processes, including wet flue gas desulfurization (FGD) plants. A systemic investigation of the influence of two foaming agents, sodium dodecyl sulphate (SDS) and egg white albumin (protein), and two commercial antifoams on a wet FGD pilot plant...

  19. A 10-MWe solar-thermal central-receiver pilot plant: Solar facilities design integration. Plant operating/training manual (RADL-Item 2-36)

    Science.gov (United States)

    1982-07-01

    Plant and system level operating instructions are provided for the Barstow Solar Pilot Plant. Individual status instructions are given that identify plant conditions, process controller responsibilities, process conditions and control accuracies, operating envelopes, and operator cautions appropriate to the operating condition. Transition operating instructions identify the sequence of activities to be carried out to accomplish the indicated transition. Most transitions involve the startup or shutdown of an individual flowpath. Background information is provided on collector field operations, and the heliostat groupings and specific commands used in support receiver startup are defined.

  20. Reports on 1977 result of research. Investigation for selecting site location of pilot plant for 7,000Nm{sup 3}/day class high calorie gasification; 1977 nendo sunshine keikaku ni kakawaru plant kenkyu kaihatsu seika hokoku. 7,000Nm{sup 3}/nichi kyu kokarori gas ka pilot plant yochi no ricchi sentei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-20

    A report was made on the result of investigation for selecting a suitable site for a coal gasification pilot plant. The high calorie gasification plant under the Sunshine Project is scheduled to have a parallel operation of two methods. It could be decided on one only method depending on the future studies. One is the 'water gasification method' using coal only as the raw material, with hydrogen gas added to contrive methanization. The other is the 'hybrid gasification method' using mixed slurry of powdered coal and heavy oil as the raw material, with oxygen supplied to it to form a clean gas. The sites proposed for the pilot plant are the cities of Yubari, Iwaki, Kita-Ibaraki, Tagawa, Iizuka and Imari. The items for assessment of cost effectiveness are the expenses of development of a site, road construction, removal of existing obstacles, plant construction, power receiving equipment construction, irrigation supply facilities construction, wastewater treatment system construction, ash discharging system construction, transportation, and supply/processing-related maintenance. As a result of the assessment, Iwaki city was picked up as the area almost free from drawbacks to cost effectiveness. (NEDO)

  1. Reports on 1977 result of research. Investigation for selecting site location of pilot plant for 7,000Nm{sup 3}/day class high calorie gasification; 1977 nendo sunshine keikaku ni kakawaru plant kenkyu kaihatsu seika hokoku. 7,000Nm{sup 3}/nichi kyu kokarori gas ka pilot plant yochi no ricchi sentei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-20

    A report was made on the result of investigation for selecting a suitable site for a coal gasification pilot plant. The high calorie gasification plant under the Sunshine Project is scheduled to have a parallel operation of two methods. It could be decided on one only method depending on the future studies. One is the 'water gasification method' using coal only as the raw material, with hydrogen gas added to contrive methanization. The other is the 'hybrid gasification method' using mixed slurry of powdered coal and heavy oil as the raw material, with oxygen supplied to it to form a clean gas. The sites proposed for the pilot plant are the cities of Yubari, Iwaki, Kita-Ibaraki, Tagawa, Iizuka and Imari. The items for assessment of cost effectiveness are the expenses of development of a site, road construction, removal of existing obstacles, plant construction, power receiving equipment construction, irrigation supply facilities construction, wastewater treatment system construction, ash discharging system construction, transportation, and supply/processing-related maintenance. As a result of the assessment, Iwaki city was picked up as the area almost free from drawbacks to cost effectiveness. (NEDO)

  2. Waste Isolation Pilot Plant in situ experimental program for HLW

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1977-01-01

    The Waste Isolation Pilot Plant (WIPP) will be a facility to demonstrate the environmental and operational safety of storing radioactive wastes in a deep geologic bedded salt facility. The WIPP will be located in southeastern New Mexico, approximately 30 miles east of the city of Carlsbad. The major focus of the pilot plant operation involves ERDA defense related low and intermediate-level transuranic wastes. The scope of the project also specifically includes experimentation utilizing commercially generated high-level wastes, or alternatively, spent unreprocessed fuel elements. WIPP HLW experiments are being conducted in an inter-related laboratory, bench-scale, and in situ mode. This presentation focuses on the planned in situ experiments which, depending on the availability of commercially reprocessed waste plus delays in the construction schedule of the WIPP, will begin in approximately 1985. Such experiments are necessary to validate preceding laboratory results and to provide actual, total conditions of geologic storage which cannot be adequately simulated. One set of planned experiments involves emplacing bare HLW fragments into direct contact with the bedded salt environment. A second set utilizes full-size canisters of waste emplaced in the salt in the same manner as planned for a future HLW repository. The bare waste experiments will study in an accelerated manner waste-salt bed-brine interactions including matrix integrity/degradation, brine leaching, system chemistry, and potential radionuclide migration through the salt bed. Utilization of full-size canisters of HLW in situ permits us to demonstrate operational effectiveness and safety. Experiments will evaluate corrosion and compatibility interactions between the waste matrix, canister and overpack materials, getter materials, stored energy, waste buoyancy, etc. Using full size canisters also allows us to demonstrate engineered retrievability of wastes, if necessary, at the end of experimentation

  3. Fiscal 1994 achievement report. Development of entrained bed coal gasification power plant (Part 4 - Pilot plant operation); 1994 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The 200 tons/day entrained bed coal gasification pilot plant constructed for the establishment of the technology of integrated coal gasification combined cycle power generation was operated for testing, and the results are put together. Operating hours recorded were 1347 hours and 7 minutes for the gasification furnace facility (7 gasification operations), 752 hours and 22 minutes for the gas clean-up facilities, 425 hours and 20 minutes for the gas turbine facility (6 startups for generating 2616.1 MWh), and 1852 hours for the treatment furnace and 1304 hours and 32 minutes for the denitration system in the safety/environment-related facility. Detailed graphs were drawn for the description of starts and stops in Run D8, Run D9 (1-3), Run D10, Run D11, and in Run D12. Operating procedures were studied and then compiled for the plant start-stop schedule, general guidelines, gasification furnace facility, gas clean-up facility (dry type desulfurization facility), gas clean-up facility (dry type dedusting facility), gas turbine facility, real-pressure natural-size combustor test facility, and for the safety/environment related facility. (NEDO)

  4. Final Report: RPP-WTP Semi-Integrated Pilot Plant

    International Nuclear Information System (INIS)

    Duignan, M. R.; Adamson, D. J.; Calloway, T. B.; Fowley, M. D.; Qureshi, Z. H.; Steimke, J. L.; Williams, M. R.; Zamecnik, J. R.

    2005-01-01

    In August 2004 the last of the SIPP task testing ended--a task that formally began with the issuance of the RPP-WTP Test Specification in June 2003. The planning for the task was a major effort in itself and culminated with the input of all stakeholders, DOE, Bechtel National, Inc., Washington Group International, in October 2003 at Hanford, WA (Appendix A). This report documents the activities carried out as a result of that planning. Campaign IV, the fourth and final step towards the Semi-Integrated Pilot Plant (SIPP) task, conducted by the Savannah River National Laboratory (SRNL) at the Savannah River Site, was to take the several recycle streams produced in Campaign III, the third step of the task, and combine them with other simulated recycle and chosen waste streams. (Campaign III was fed recycles from Campaign II, as Campaign II was fed by Campaign I.) The combined stream was processed in a fashion that mimicked the pretreatment operations of the DOE River Protection Project--Waste Treatment and Immobilization Plant (RPP-WTP) with the exception of the Ion Exchange Process. The SIPP task is considered semi-integrated because it only deals with the pretreatment operations of the RPP-WTP. That is, the pilot plant starts by receiving waste from the tank farm and ends when waste is processed to the point of being sent for vitrification. The resulting pretreated LAW and HLW simulants produced by the SIPP were shipped to VSL (Vitreous State Laboratory) and successfully vitrified in pilot WTP melters. Within the SIPP task these steps are referred to as Campaigns and there were four Campaigns in all. Campaign I, which is completely different than other campaigns, subjected a simulant of Hanford Tank 241-AY-102/C-106 (AY102) waste to cross-flow ultrafiltration only and in that process several important recycle streams were produced as a result of washing the simulant and cleaning the cross-flow filter. These streams were fed to subsequent campaigns and that work was

  5. Final Report: RPP-WTP Semi-Integrated Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Duignan, M. R.; Adamson, D. J.; Calloway, T. B.; Fowley, M. D.; Qureshi, Z. H.; Steimke, J. L.; Williams, M. R.; Zamecnik, J. R.

    2005-06-01

    In August 2004 the last of the SIPP task testing ended--a task that formally began with the issuance of the RPP-WTP Test Specification in June 2003. The planning for the task was a major effort in itself and culminated with the input of all stakeholders, DOE, Bechtel National, Inc., Washington Group International, in October 2003 at Hanford, WA (Appendix A). This report documents the activities carried out as a result of that planning. Campaign IV, the fourth and final step towards the Semi-Integrated Pilot Plant (SIPP) task, conducted by the Savannah River National Laboratory (SRNL) at the Savannah River Site, was to take the several recycle streams produced in Campaign III, the third step of the task, and combine them with other simulated recycle and chosen waste streams. (Campaign III was fed recycles from Campaign II, as Campaign II was fed by Campaign I.) The combined stream was processed in a fashion that mimicked the pretreatment operations of the DOE River Protection Project--Waste Treatment and Immobilization Plant (RPP-WTP) with the exception of the Ion Exchange Process. The SIPP task is considered semi-integrated because it only deals with the pretreatment operations of the RPP-WTP. That is, the pilot plant starts by receiving waste from the tank farm and ends when waste is processed to the point of being sent for vitrification. The resulting pretreated LAW and HLW simulants produced by the SIPP were shipped to VSL (Vitreous State Laboratory) and successfully vitrified in pilot WTP melters. Within the SIPP task these steps are referred to as Campaigns and there were four Campaigns in all. Campaign I, which is completely different than other campaigns, subjected a simulant of Hanford Tank 241-AY-102/C-106 (AY102) waste to cross-flow ultrafiltration only and in that process several important recycle streams were produced as a result of washing the simulant and cleaning the cross-flow filter. These streams were fed to subsequent campaigns and that work was

  6. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse TRU Solutions

    2000-12-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period.

  7. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    Westinghouse TRU Solutions

    2000-01-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period

  8. Dynamics of microbial communities in an integrated ultrafiltration–reverse osmosis desalination pilot plant located at the Arabian Gulf

    KAUST Repository

    Hong, Pei-Ying

    2015-08-27

    This study demonstrated the use of high-throughput sequencing to assess the efficacy of an integrated ultrafiltration (UF)–reverse osmosis (RO) desalination pilot plant located at the Arabian Gulf, and to identify potential microbial-associated problems that may arise in this plant. When integrated into the desalination treatment system, the UF membranes were able to serve as a good pretreatment strategy to delay RO fouling by achieving up to 1.96-log removal of cells from the seawater. Consequently, the differential pressure of the RO membrane remained around 1 bar for the entire six-month study, suggesting no significant biofouling performance issue identified for this RO system. Examples of microbial populations effectively removed by the UF membranes from the feed waters included Nitrosoarchaeum limnia and phototrophic eukaryotes. Microbial-associated problems observed in this pilot plant included the presence of Pseudomonas spp. in coexistence with Desulfovibrio spp. These two bacterial populations can reduce sulfate and produce hydrogen sulfide, which would in turn cause corrosion problems or compromise membrane integrities. Chemical-enhanced backwashing (CEB) can be used as an effective strategy to minimize the associated microbial problems by removing bacterial populations including sulfate reducers from the UF membranes.

  9. Dynamics of microbial communities in an integrated ultrafiltration–reverse osmosis desalination pilot plant located at the Arabian Gulf

    KAUST Repository

    Hong, Pei-Ying; Moosa, Nasir; Mink, Justine

    2015-01-01

    This study demonstrated the use of high-throughput sequencing to assess the efficacy of an integrated ultrafiltration (UF)–reverse osmosis (RO) desalination pilot plant located at the Arabian Gulf, and to identify potential microbial-associated problems that may arise in this plant. When integrated into the desalination treatment system, the UF membranes were able to serve as a good pretreatment strategy to delay RO fouling by achieving up to 1.96-log removal of cells from the seawater. Consequently, the differential pressure of the RO membrane remained around 1 bar for the entire six-month study, suggesting no significant biofouling performance issue identified for this RO system. Examples of microbial populations effectively removed by the UF membranes from the feed waters included Nitrosoarchaeum limnia and phototrophic eukaryotes. Microbial-associated problems observed in this pilot plant included the presence of Pseudomonas spp. in coexistence with Desulfovibrio spp. These two bacterial populations can reduce sulfate and produce hydrogen sulfide, which would in turn cause corrosion problems or compromise membrane integrities. Chemical-enhanced backwashing (CEB) can be used as an effective strategy to minimize the associated microbial problems by removing bacterial populations including sulfate reducers from the UF membranes.

  10. Geotechnical Perspectives on the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Francke, Chris T.; Hansen, Frank D.; Knowles, M. Kathyn; Patchet, Stanley J.; Rempe, Norbert T.

    1999-01-01

    The Waste Isolation Pilot Plant (WIPP) is the first nuclear waste repository certified by the United States Environmental Protection Agency. Success in regulatory compliance resulted from an excellent natural setting for such a repository, a facility with multiple, redundant safety systems, and from a rigorous, transparent scientific and technical evaluation. The WIPP story, which has evolved over the past 25 years, has generated a library of publications and analyses. Details of the multifaceted program are contained in the cited references. Selected geotechnical highlights prove the eminent suitability of the WIPP to serve its congressionally mandated purpose

  11. Some economic considerations for a pilot plant based on the adsorber loop concept

    International Nuclear Information System (INIS)

    Koske, P.H.; Ohlrogge, K.; Jager, W.

    1984-01-01

    Some first order estimates about the production costs of seawater uranium are presented on the basis of a pilot plant with a capacity of about 100 t uranium per year. The plant is assumed to be operating at high seas using the ''adsorber loop concept'' for the contact between seawater and adsorber granulate. The effects of some process relevant components and parameters are discussed with regard to their contribution to the production costs and in order to analyse their cost-cutting potential. (orig.) [de

  12. Pilot plant development of a new catalytic process for improved electrostatic separation of fly-ash in coal fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Olivares del Valle, J.; Salvador Martinez, L.; Muniz Baum, B.; Cortes Galeano, V. [University of Seville, Seville (Spain). Chemical and Environmental Engineering Dept.

    1996-12-31

    A new catalytic process for flue gas conditioning in pulverized coal fired power plants is outlined. Vanadium and platinum catalysts specifically prepared on ceramic honeycomb monoliths to oxidize SO{sub 2} into SO{sub 3} have been tested and evaluated at pilot scale. 10 refs., 3 figs., 2 tabs.

  13. 90% Compliance Pilot Studies Final Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    In early 2010, the U.S. Department of Energy (DOE) announced an opportunity for states to participate in energy code compliance evaluation pilot studies. DOE worked with five Regional Energy Efficiency Organizations (REEOs, formerly referred to as Energy Efficiency Partnerships, or EEPs) to fund pilot studies covering nine states. This report details conclusions stated in individual state reports, as well as conclusions drawn by DOE based on their oversight of the pilot studies, and based on discussions held with the REEOs and representatives from the pilot study states and their contractors.

  14. The pilot plant for electron beam food processing

    International Nuclear Information System (INIS)

    Migdal, W.; Stachowicz, W.

    1993-01-01

    The investigations on food irradiation began in Poland in the end of 50-ties. Till the end of 70-ties the research activity on food irradiation was rather of the random nature and the objectives involved the fundamental research areas of food science. After the JECFI recommended in 1980 the general approval of foods treated with the doses of ionizing radiation up to 10 kG as unconditionally wholesome, the interest on practical application of food irradiation was gained in Poland. In 1986 the governmental bodies decided to recognize the possibilities of practical application of radiation techniques in agriculture, and the Central Research and Development Project No 10.13. ''Radiation Techniques in Agriculture'' was initiated for the period of 5 years. The project in the part that refers to food irradiations involved 3 major objectives: - radiation preservation of food; - radiation hygienization of animal feed; - Pilot plants for food irradiation. The most liable project of the programme was the construction of experimental plant for electron beam food irradiation, intended to be the national center for future testing and implementary works in this field. (orig.)

  15. Large Pilot Scale Testing of Linde/BASF Post-Combustion CO2 Capture Technology at the Abbott Coal-Fired Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    O' Brien, Kevin C. [University of Illinois, Champaign, IL (United States)

    2017-08-18

    The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact at the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO2. Towards the larger project goal, the UI-led team, together

  16. Pilot plant studies on the treatment of El Atshan Uranium Ores, Eastern Desert, Egypt.

    Energy Technology Data Exchange (ETDEWEB)

    Abd Elghany, M S; Mahdy, M A [Nuclear materials authority, El-Maadi, Cairo, (Egypt); Abd El-Monem, A M; El-Hazek, A T [Faculty of engineering, Cairo university, Cairo, (Egypt)

    1995-10-01

    The present work deals with studying the different processes leading to the preparation of commercial uranium concentrate (yellow cake) from El Atshan granitic ore material (0.077%U) after acid leading of the latter, the two common extraction techniques of uranium from the obtained sulphate leach liquor; namely, anion exchange rein and solvent extraction have been studied. The studied leaching and extraction conditions-realized on the lab scale-were applied to inches pilot plant unit (capacity 150 kg ore). An average leaching leaching efficiency exceeding 88% has been achieved. Using anion exchange resin, it has been possible to prepare a uranium peroxide concentrate assaying a uranium content of about 67% U{sub 3} O{sub 8}. Only trace amount of Ca, Fe, Po{sub 4}, Cr and Pb have been detected. On the other hand, sodium uranate, as a uranium precipitate was prepared from the strip solution of the loaded solvent (di-2-ethyl) phosphoric acid concerned with the evaluation of a new optimized technique for the principle of chloramine-T method used for insulin iodination for the modified procedure can be carried out under normal condition of room temperature, employed longer reaction times and omitted the addition of inorganic reducing salts maintaining efficient iodination and avoiding denaturation to obtain labels of exceedingly high specific activity and small quantities of insulin for in vitro usage in the investigation of human erythrocytes 125 I-inulin binding capacity in normal and in some disease status. 9 figs., 2 tabs.

  17. History of geophysical studies at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    International Nuclear Information System (INIS)

    Borns, D.J.

    1997-01-01

    A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and potential field techniques have supported characterization, monitoring and experimental studies at the Waste Isolation Pilot Plant (WIPP). The geophysical studies have provided significant understanding of the nature of site deformation, tectonics and stability. Geophysical methods have delineated possible brine reservoirs beneath the underground facility and have defined the disturbed rock zone that forms around underground excavations. The role of geophysics in the WIPP project has evolved with the project. The early uses were for site characterization to satisfy site selection criteria or factors. As the regulatory framework for WIPP grew since 1980, the geophysics program supported experimental and field programs such as Salado hydrogeology and underground room systems and excavations. In summary, the major types of issues that geophysical studies addressed for WIPP are: Site Characterization; Castile Brine Reservoirs; Rustler/Dewey Lake Hydrogeology; Salado Hydrogeology; and Excavation Effects. The nature of geophysics programs for WIPP has been to support investigation rather than being the principal investigation itself. The geophysics program has been used to define conceptual models (e.g., the Disturbed Rock Zone-DRZ) or to test conceptual models (e.g., high transmissivity zones in the Rustler Formation). The geophysics program primarily supported larger characterization and experimental programs. Funding was not available for the complete documentation and interpretation. Therefore, a great deal of the geophysics survey information resides in contractor reports

  18. Pilot plant studies on the treatment of El Atshan Uranium Ores, Eastern Desert, Egypt

    International Nuclear Information System (INIS)

    Abd Elghany, M.S.; Mahdy, M.A.; Abd El-Monem, A.M.; El-Hazek, A.T.

    1995-01-01

    The present work deals with studying the different processes leading to the preparation of commercial uranium concentrate (yellow cake) from El Atshan granitic ore material (0.077%U) after acid leading of the latter, the two common extraction techniques of uranium from the obtained sulphate leach liquor; namely, anion exchange rein and solvent extraction have been studied. The studied leaching and extraction conditions-realized on the lab scale-were applied to inches pilot plant unit (capacity 150 kg ore). An average leaching leaching efficiency exceeding 88% has been achieved. Using anion exchange resin, it has been possible to prepare a uranium peroxide concentrate assaying a uranium content of about 67% U 3 O 8 . Only trace amount of Ca, Fe, Po 4 , Cr and Pb have been detected. On the other hand, sodium uranate, as a uranium precipitate was prepared from the strip solution of the loaded solvent (di-2-ethyl phosphoric acid concerned with the evaluation of a new optimized technique for the principle of chloramine-T method used for insulin iodination for the modified procedure can be carried out under normal condition of room temperature, employed longer reaction times and omitted the addition of inorganic reducing salts maintaining efficient iodination and avoiding denaturation to obtain labels of exceedingly high specific activity and small quantities of insulin for in vitro usage in the investigation of human erythrocytes 125 I-inulin binding capacity in normal and in some disease status. 9 figs., 2 tabs

  19. A pilot plant study for CO{sub 2} capture by aqueous ammonia applied to blast furnace gas in iron and steel making process

    Energy Technology Data Exchange (ETDEWEB)

    Young Kim, J.; Han, K.; Dong Chun, H. [CO2 Project, Research Inst. of Industrial Science and Technology, Pohang (Korea, Republic of)

    2009-07-01

    This presentation reported on a study in which carbon dioxide (CO{sub 2}) was captured from a demonstration iron and steel plant using low concentration aqueous ammonia as the absorbent chemical. The pilot plant was designed to process 50 Nm{sup 3}/h of blast furnace gas (BFG). The feed gas contained more than 20 per cent CO{sub 2} at 35 to 60 degrees C. Test runs revealed that the absorption efficiency of CO{sub 2} exceeded 80 per cent with a CO{sub 2} purity of more than 90 per cent in the product stream. The process parameters are currently being studied along with the various salts needed to prevent salt precipitation. It was determined that the use of waste heat recovery technology in the iron and steel-making process can render ammonia-based CO{sub 2} capture technology more economically feasible for the reduction of CO{sub 2}.

  20. Report on the results of the R and D of a 200 t/d entrained bed coal gasification pilot plant. Summary - Part 2. Volume 3: Results of the study operation and the evaluation; 1986- 200t/nichi funryusho sekitan gaska hatsuden pilot plant no kenkyu seika hokokusho (Matome). Sono 2. Dai 3 hen kenkyu unten seika to sono hyoka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    A project was finished which had been carried out for 11 years since 1986 for technology of the entrained bed coal gasification power generation technology using a 200 t/d coal gasification combined cycle power generation pilot plant, and it was comprehensively summed up. In Volume 3: Results of the study operation and the evaluation, the following were summarized on gasifier: gasification performance of 200 t/d furnace, operation ability of the bituminous coal supply system, stability of char recovery, deposition of slag and char in furnace, discharge characteristics of molten slag, operation characteristics, etc. The following on gas refining facilities: dry desulfurizer, dust remover, new gas refining equipment (fixed bed dust removal/desulfurization system, packed bed desulfuriztion/dust removal system), etc. The following on gas turbine facilities: 12.5 MW gas turbine, large gas turbine, large gas turbine combustor, etc. Additionally, the paper summarized the control system and total function, operation characteristics of the whole pilot plant, relations of environmental preservation, study of the effective slag utilization, collection/study of unfavorable conditions/troubles and matters for the reflection, etc. (NEDO)

  1. Pilot study

    International Nuclear Information System (INIS)

    Hofmeester, G.H.; Swart, A.; Dijk, E. van

    1984-01-01

    In May 1980 it was decided to organize an intercomparison of personal dosimeters for photon radiations. The Commission of the European Communities initiated the intercomparison by starting a pilot study in which three laboratories NPL (United Kingdom), PTB (Germany) and RIV (The Netherlands) were asked to irradiate a series of personal dosemeters from institutes, GSF (Muenchen), CEA (Fontenay-aux-Roses), CNEN (Bologna) and CEGB (Berkeley). The latter institutes are secondary standard laboratories and have a radiation protection service as well. A new aspect of this pilot study is the fact that the irradiations also take place in front of a phantom. Irradiations took place in July and August 1980. The results of 4 institutes show that the personal dosemeters are quite capable of measuring the backscattered photon components

  2. New conceptual method in maintenance with application in cryogenics pilot plant (CPP)

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2006-01-01

    Full text: This study concluded with a series of suggestions concerning the methodology of maintaining a Cryogenics Nuclear Plant where the maintenance is either fundamental or only of importance. The implementation of this methodology can be achieved in two main steps. The first step concerns the conception of the scientific basis for maintenance, while the second step regards the implementation. The first step describes the management of maintenance in conditions of quality, risk and cost constraints. The conditions are established on the basis of a project of research in maintenance. The second step notifies the aspects of design and technology in maintenance of nuclear industrial units. The nuclear complex technical systems of the Cryogenics Pilot Plant at ICSI - Rm Valcea implies the development of some dedicated software, to ensure the designing, realization and operation of the plant, and prototypes of integrated software modules, to ensure the systems operation during of the life cycle. The implementation method is based on vibration analyses and mechanical studies while a flexible data acquisition system for monitoring, and control must be developed as a platform to ensure a more precise diagnosis and prediction of machinery malfunction. With a flexible data acquisition and analysis system in operation it is possible to easily increase the number of input channels. (author)

  3. Waste Isolation Pilot Plant Annual Site Environmental Report for 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

  4. Removal of ammonia nitrogen in wastewater by microwave radiation: A pilot-scale study

    International Nuclear Information System (INIS)

    Lin Li; Chen Jing; Xu Zuqun; Yuan Songhu; Cao Menghua; Liu Huangcheng; Lu Xiaohua

    2009-01-01

    A large removal of ammonia nitrogen in wastewater has been achieved by microwave (MW) radiation in our previous bench-scale study. This study developed a continuous pilot-scale MW system to remove ammonia nitrogen in real wastewater. A typical high concentration of ammonia nitrogen contaminated wastewater, the coke-plant wastewater from a Coke company, was treated. The output power of the microwave reactor was 4.8 kW and the handling capacity of the reactor was about 5 m 3 per day. The ammonia removal efficiencies under four operating conditions, including ambient temperature, wastewater flow rate, aeration conditions and initial concentration were evaluated in the pilot-scale experiments. The ammonia removal could reach about 80% for the real coke-plant wastewater with ammonia nitrogen concentrations of 2400-11000 mg/L. The running cost of the MW technique was a little lower than the conventional steam-stripping method. The continuous microwave system showed the potential as an effective method for ammonia nitrogen removal in coke-plant water treatment. It is proposed that this process is suitable for the treatment of toxic wastewater containing high concentrations of ammonia nitrogen.

  5. Test phase plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) has prepared this Test Phase Plan for the Waste Isolation Pilot Plant to satisfy the requirements of Public Law 102-579, the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA). The Act provides seven months after its enactment for the DOE to submit this Plan to the Environmental Protection Agency (EPA) for review. A potential geologic repository for transuranic wastes, including transuranic mixed wastes, generated in national-defense activities, the WIPP is being constructed in southeastern New Mexico. Because these wastes remain radioactive and chemically hazardous for a very long time, the WIPP must provide safe disposal for thousands of years. The DOE is developing the facility in phases. Surface facilities for receiving waste have been built and considerable underground excavations (2150 feet below the surface) that are appropriate for in-situ testing, have been completed. Additional excavations will be completed when they are required for waste disposal. The next step is to conduct a test phase. The purpose of the test phase is to develop pertinent information and assess whether the disposal of transuranic waste and transuranic mixed waste in the planned WIPP repository can be conducted in compliance with the environmental standards for disposal and with the Solid Waste Disposal Act (SWDA) (as amended by RCRA, 42 USC. 6901 et. seq.). The test phase includes laboratory experiments and underground tests using contact-handled transuranic waste. Waste-related tests at WIPP will be limited to contact-handled transuranic and simulated wastes since the LWA prohibits the transport to or emplacement of remote-handled transuranic waste at WIPP during the test phase

  6. Anaerobic biogasification of domestic wastes and direct solar energy use to produce biogas, biofertilizer and distilled water in a city - a pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    kumar, R.A.; Pandya, N.H.; Patil, A.M.; Annamalai, M.; Iyer, M.V.; Nirmala, K.A.; Venkatesh, P.; Prasad, C.R.; Subramani, C.

    1982-01-01

    Domestic wastes are a source of gas of high calorific value as well as biofertilizer and distilled water. A pilot project undertaken by the Tata Electric Cos., Bombay on recycling sewage, garbage and garden wastes of a community by converting them into biogas, organic fertilizer and distilled water is described. Techniques used are anaerobic fermentation and Solar drying using Solar stills. A fish pond also can be fed the output slurry as feed material. In this pilot plant, 1 to 2 m/sup 3/ raw sewage and one to two tons of processed garden wastes and garbage would be input daily into the digester. The production is expected to be about 100 m/sup 3/ of gas per day, along with about 1500 litres of slurry from which organic fertilizer of 100 200 Kgs can be bagged and transported as well as distilled water of about 500 to 1000 litres Laboratory studies and studies on an approximate scale model of the plant are described. Scaling up to a pilot plant by about 2000 times would increase the efficiency of the rate of gas production as has been found by other workers. These tests and studies have shown that the project is technically and eonomically viable. Applications of the process on a mass scale would result in increasing replacement of fossil energy intensive processes with negentropic methods of economic and social activities.

  7. Monitoring and toxicity evaluation of phytoplankton on lithium manganese oxide adsorbents at lithium recovery pilot plant field.

    Science.gov (United States)

    Yoon, H. O.; Kim, J. A.; Kim, J. C.; Chung, K. S.; Ryu, J. H.

    2015-12-01

    For recovery of rare mineral resources such as lithium or boron from seawater, the lithium adsorbent material have been made by Korea Institute of Geoscience and Mineral Resources (KIGAM) and pilot plant was conducted in Okgye Harbor, Gangneung, Korea. The application of lithium adsorbent in pilot plant, it is important to consider the impact on the marine environment. Especially phytoplankton communities are important marine microorganism to represent marine primary product. At the same time, phytoplankton is possible to induce the decrease of lithium recovery rate due to cause of biofouling to surfaces of lithium adsorbents. Therefore long-term and periodic monitoring of phytoplankton is necessary to understand the environmental impact and biofouling problems near the lithium pilot plant. The abundance and biomass of phytoplankton have been evaluated through monthly interval sampling from February 2013 to May 2015. Abundance and species diversity of phytoplankton went up to summer from winter. When lithium adsorbents were immersing to seawater, eco-toxicities of released substances were determined using Microtox with bioluminescence bacteria Vibrio fischeri. The adsorbents were soaked in sterilized seawater and aeration for 1, 3, 5, 7, 10 and 14 days intervals under controlled temperature. Maximum EC50 concentration was 61.4% and this toxicity was showed in more than 10 days exposure.

  8. The Waste Isolation Pilot Plant Performance Assessment Program

    International Nuclear Information System (INIS)

    Myers, J.; Coons, W.E.; Eastmond, R.; Morse, J.; Chakrabarti, S.; Zurkoff, J.; Colton, I.D.; Banz, I.

    1986-01-01

    The Waste Isolation Pilot Plant (WIPP) Performance Assessment Program involves a comprehensive analysis of the WIPP project with respect to the recently finalized Environmental Protection Agency regulations regarding the long-term geologic isolation of radioactive wastes. The performance assessment brings together the results of site characterization, underground experimental, and environmental studies into a rigorous determination of the performance of WIPP as a disposal system for transuranic radioactive waste. The Program consists of scenario development, geochemical, hydrologic, and thermomechanical support analyses and will address the specific containment and individual protection requirements specified in 40 CFR 191 sub-part B. Calculated releases from these interrelated analyses will be reported as an overall probability distribution of cumulative release resulting from all processes and events occurring over the 10,000 year post-closure period. In addition, results will include any doses to the public resulting from natural processes occurring over the 1,000 year post-closure period. The overall plan for the WIPP Performance Assessment Program is presented along with approaches to issues specific to the WIPP project

  9. The Waste Isolation Pilot Plant: a potential solution for the disposal of transuranic waste

    National Research Council Canada - National Science Library

    National Research Council Staff; Commission on Geosciences, Environment and Resources; Division on Earth and Life Studies; National Research Council; National Academy of Sciences

    ... Isolation Pilot Plant Board on Radioactive Waste Management Commission on Geosciences, Environment, and Resources National Research Council NATIONAL ACADEMY PRESS Washington, D.C. 1996 i Copyrighttrue Please breaks inserted. are Page files. accidentally typesetting been have may original from the errors not typographic original retained, and from the c...

  10. Experimental program plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  11. Experimental program plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included

  12. Draft forecast of the final report for the comparison to 40 CFR Part 191, Subpart B, for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bertram-Howery, S.G.; Marietta, M.G.; Anderson, D.R.; Gomez, L.S.; Rechard, R.P. (Sandia National Labs., Albuquerque, NM (USA)); Brinster, K.F.; Guzowski, R.V. (Science Applications International Corp., Albuquerque, NM (USA))

    1989-12-01

    The United States Department of Energy is planning to dispose of transuranic wastes, which have been generated by defense programs, at the Waste Isolation Pilot Plant. The WIPP Project will assess compliance with the requirements of the United States Environmental Protection Agency. This report forecasts the planned 1992 document, Comparison to 40 CFR, Part 191, Subpart B, for the Waste Isolation Pilot Plant (WIPP). 130 refs., 36 figs., 11 tabs.

  13. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-01-01

    This volume contains Appendix D2, engineering design basis reports. Contents include: Design considerations for the waste hoist of the Waste Isolation Pilot Plant (WIPP); A site-specific study of wind and tornado probabilities at the WIPP Site in southeast New Mexico; Seismic evaluation report of underground facilities; and calculations for analysis of wind loads and tornado loads for WHB, seismic calculations, calculations for VOC-10 monitoring system, and for shaft at station A

  14. A 22 MW pilot plant with an ammonia bottoming cycle is being tested by Electricite de France

    International Nuclear Information System (INIS)

    Fleury, J.; Bellot, C.

    1989-01-01

    EDF's DER has built a 22 MW ammonia bottoming cycle pilot power plant in Gennevilliers near Paris. This construction marks a turning point in the development of bottoming cycles which was undertaken at EDF in 1970. These cycles could be used in powerful PWR plants. The key feature of this type of plant is its appreciable capacity gain when the temperature of the heat sink drops. Thus, with a heat sink of the dry cooling tower type, low air temperatures in winter can be turned to use to produce more energy when demand is at its highest. At the same time, with dry cooling towers, a tiresome constraint vanishes since the plant location choice does no longer depend on the existence of a water reservoir in the vicinity of the plant. The construction of the pilot plant Cybiam began in 1980. Its steam turbine-generator set was coupled to the French network in March 1986 and its ammonia turbine-generator set in December 1986. The full load was attained on June 4th 1987. The main problems met during its commissioning are described in this paper as well as the first test results. From the economic point of view, the money value of the extra power generated during cold spells is assessed

  15. Electrodialytic remediation of CCA-treated waste wood in a 2 m3 pilot plant

    DEFF Research Database (Denmark)

    Christensen, Iben Vernegren; Pedersen, Anne Juul; Ottosen, Lisbeth M.

    2006-01-01

    Waste wood that has been treated with chromated-copper-arsenate (CCA) poses a potential environmental problem due to the content of copper, chromium and arsenic. A pilot plant for electrodialytic remediation of up to 2 m3 wood has been designed and tested and the results are presented here. Sever...

  16. Geomechanical applications for the Waste Isolation Pilot Plant (WIPP) project

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Hunter, T.O.

    1981-01-01

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility in bedded salt addressing the technical issues associated with the demonstration of disposal of radioactive waste from the defense programs of the USA. The geomechanical program includes laboratory experimentation, constitutive model and computer code development, and in-situ experimentation. Various material models, including creep for salt, and techniques for predicting room response under thermal and mechanical loads have been developed and are being applied to experiment and facility designs. A Benchmark II study has been conducted to compare the capabilities of nine structural codes to predict response of underground configuration under ambient temperature and with a thermal load of 7.5 W/m 2 . Parametric studies are being conducted to evaluate optimum room configurations. A series of in situ experiments is the next step towards validating models and predictive techniques. These experiments will be conducted in a facility in southeastern New Mexico mined at a depth of 659 m

  17. Operating boundaries of full-scale advanced water reuse treatment plants: many lessons learned from pilot plant experience.

    Science.gov (United States)

    Bele, C; Kumar, Y; Walker, T; Poussade, Y; Zavlanos, V

    2010-01-01

    Three Advanced Water Treatment Plants (AWTP) have recently been built in South East Queensland as part of the Western Corridor Recycled Water Project (WCRWP) producing Purified Recycled Water from secondary treated waste water for the purpose of indirect potable reuse. At Luggage Point, a demonstration plant was primarily operated by the design team for design verification. The investigation program was then extended so that the operating team could investigate possible process optimisation, and operation flexibility. Extending the demonstration plant investigation program enabled monitoring of the long term performance of the microfiltration and reverse osmosis membranes, which did not appear to foul even after more than a year of operation. The investigation primarily identified several ways to optimise the process. It highlighted areas of risk for treated water quality, such as total nitrogen. Ample and rapid swings of salinity from 850 to 3,000 mg/l-TDS were predicted to affect the RO process day-to-day operation and monitoring. Most of the setpoints used for monitoring under HACCP were determined during the pilot plant trials.

  18. PILOT STUDY: THE TAMPA ASTHMATIC CHILDREN'S STUDY (TACS)

    Science.gov (United States)

    The Tampa Asthmatic Children's Study (TACS) was a pilot research study that focused on developing and evaluating air pollution exposure assessment methods and participant recruiting tools for children in the age range of 1-5 years old. The pilot study focused on (a) simple, cost-...

  19. Letter report: Pre-conceptual design study for a pilot-scale Non-Radioactive Low-Level Waste Vitrification Facility

    International Nuclear Information System (INIS)

    Thompson, R.A.; Morrissey, M.F.

    1996-03-01

    This report presents a pre-conceptual design study for a Non-Radioactive Low-Level Waste, Pilot-Scale Vitrification System. This pilot plant would support the development of a full-scale LLW Vitrification Facility and would ensure that the full-scale facility can meet its programmatic objectives. Use of the pilot facility will allow verification of process flowsheets, provide data for ensuring product quality, assist in scaling to full scale, and support full-scale start-up. The facility will vitrify simulated non-radioactive LLW in a manner functionally prototypic to the full-scale facility. This pre-conceptual design study does not fully define the LLW Pilot-Scale Vitrification System; rather, it estimates the funding required to build such a facility. This study includes identifying all equipment necessary. to prepare feed, deliver it into the melter, convert the feed to glass, prepare emissions for atmospheric release, and discharge and handle the glass. The conceived pilot facility includes support services and a structure to contain process equipment

  20. Resource conservation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume I contains the following attachments for Module II: waste analysis plan; quality assurance program plan for the Waste Isolation Pilot Plant (WIPP) Experiment Waste Characterization Program(QAPP); WIPP Characterization Sampling and Analysis Guidance Manual (Plan)(SAP); and no migration Determination Requirement Summary (NMD)

  1. History of geophysical studies at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico

    International Nuclear Information System (INIS)

    Borns, D.J.

    1997-01-01

    A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and potential field techniques have used support characterization, monitoring and experimental studies at the Waste Isolation Pilot Plant (WIPP). The geophysical studies have provided significant understanding of the nature of site deformation, tectonics and stability. Geophysical methods have delineated possible brine reservoirs beneath the underground facility and have defined the disturbed rock zone that forms around underground excavations. The role of geophysics in the WIPP project has evolved with the project. The early uses were for site characterization to satisfy site selection criteria or factors. As the regulatory framework for WIPP grew since 1980, the geophysics program was focused on support of experimental and field programs such as Salado hydrogeology and underground room systems and excavations. In summary, the major types of issues that geophysical studies addressed for WIPP are: Issue 1: Site Characterization; Issue 2: Castile Brine Reservoirs; Issue 3: Rustler /Dewey Lake Hydrogeology; Issue 4: Salado Hydrogeology; and Issue 5: Excavation Effects. The nature of geophysics program for WIPP has been to support investigation rather than being the principal investigation itself. The geophysics program has been used to define conceptual models (e.g., the Disturbed Rock Zone-DRZ) or to test conceptual models (e.g., high transmissivity zones in the Rustler Formation). An effect of being a support program is that as new project priorities arose the funding for the geophysics program was limited and withdrawn. An outcome is that much of the geophysics survey information resides in contractor reports since final interpretation reports were not funded

  2. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    Energy Technology Data Exchange (ETDEWEB)

    Powers, D.W. [Powers (Dennis W.), Anthony, TX (United States); Martin, M.L. [International Technology, Inc., Las Vegas, NV (United States)

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries.

  3. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    International Nuclear Information System (INIS)

    Powers, D.W.; Martin, M.L.

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries

  4. Studies on the hydroprocessing of deashed oil. 10. ; Comparison of the reaction performance between pilot plant and BSU. Deashed oil no suisoka bunkai hanno ni kansuru kenkyu. 10. ; Pilot to bench hanno sochi no hanno tokusei no hikaku

    Energy Technology Data Exchange (ETDEWEB)

    Hijiriyama, M.; Kaneko, T. (Mitsubishi Kasei Co., Tokyo (Japan)); Kageyama, Y. (Nippon Brown Coal Liquefaction Co. Ltd., Tokyo (Japan))

    1990-11-29

    The secondary hydroprocessing process in the two-stage hydrogenating liquefaction equipment under development at Nippon Brown Coal Liquefaction Company uses a fixed bed system. This paper describes operation of a bench reaction equipment using catalyst used in the pilot plant to compare it with fresh catalyst, and compare characteristics of the bench scale equipment with those of the pilot reactor. The catalyst is Ca-Ni-No/Al2O. The reaction was carried out in a gas-liquid downward parallel-flow fixed-bed reactor using deashed oil (DAO) with the same material as that used in the pilot plant and the same equilibrium solvent. The experiment result indicates that the used catalyst had its activity fallen below the fresh catalyst, but its temperature dependence was identical, and the selectivity on products of both catalysts was also identical. The result of reactions in the bench scale equipment clarified that the relationship between the DAO conversion rate and denitrogenation activity and the relationship between fa and H/C in the products are in good agreement, and that there is no difference in reaction selectivity. 5 refs., 6 figs., 1 tab.

  5. Repellent plants provide affordable natural screening to prevent mosquito house entry in tropical rural settings--results from a pilot efficacy study.

    Directory of Open Access Journals (Sweden)

    Frank C Mng'ong'o

    Full Text Available Sustained malaria control is underway using a combination of vector control, prompt diagnosis and treatment of malaria cases. Progress is excellent, but for long-term control, low-cost, sustainable tools that supplement existing control programs are needed. Conventional vector control tools such as indoor residual spraying and house screening are highly effective, but difficult to deliver in rural areas. Therefore, an additional means of reducing mosquito house entry was evaluated: the screening of mosquito house entry points by planting the tall and densely foliated repellent plant Lantana camara L. around houses. A pilot efficacy study was performed in Kagera Region, Tanzania in an area of high seasonal malaria transmission, where consenting families within the study village planted L. camara (Lantana around their homes and were responsible for maintaining the plants. Questionnaire data on house design, socioeconomic status, malaria prevention knowledge, attitude and practices was collected from 231 houses with Lantana planted around them 90 houses without repellent plants. Mosquitoes were collected using CDC Light Traps between September 2008 and July 2009. Data were analysed with generalised negative binomial regression, controlling for the effect of sampling period. Indoor catches of mosquitoes in houses with Lantana were compared using the Incidence Rate Ratio (IRR relative to houses without plants in an adjusted analysis. There were 56% fewer Anopheles gambiae s.s. (IRR 0.44, 95% CI 0.28-0.68, p<0.0001; 83% fewer Anopheles funestus s.s. (IRR 0.17, 95% CI 0.09-0.32, p<0.0001, and 50% fewer mosquitoes of any kind (IRR 0.50, 95% CI 0.38-0.67, p<0.0001 in houses with Lantana relative to controls. House screening using Lantana reduced indoor densities of malaria vectors and nuisance mosquitoes with broad community acceptance. Providing sufficient plants for one home costs US $1.50 including maintenance and labour costs, (30 cents per person. L

  6. Annual stability evaluation of Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-06-01

    A stability evaluation of the underground workings of the Waste Isolation Pilot Plant (WIPP) was completed by the US Bureau of Mines' WIPP evaluation committee. This work included a critical evaluation of the processes employed at WIPP to ensure stability, an extensive review of available deformation measurements, a 3-day site visit, and interviews with the Department of Energy (DOE) and Westinghouse staff. General ground control processes are in place at WIPP to minimize the likelihood that major stability problems will go undetected. To increase confidence in both short- and long-term stability throughout the site (underground openings and shafts), ground stability monitoring systems, mine layout design, support systems and data analyses must be continuously improved. Such processes appear to be in place at WIPP and are discussed in this paper

  7. Revised concept for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Dennis, A.W.; Milloy, J.A.; Scully, L.W.; Shefelbine, H.C.; Stinebaugh, R.E.; Wowak, W.E.

    1978-07-01

    The quantities of remotely handled wastes that must be handled at the Waste Isolation Pilot Plant have been reduced from 250 x 10 3 ft 3 /y to 10 x 10 3 ft 3 /y; the capital cost of the facility will be reduced from 534 to 428 million dollars. Changes in the facility design due to the reduction in the amount of remote-handled waste are discussed. If DOE should exercise its option to construct a high-level waste repository concurrently with the construction of the revised design, with both facilities receiving waste in 1985, the combined cost would be about 580 million dollars. However, it is unlikely that significant quantities of high-level waste in a form suitable for geologic disposal would be available until after 1990. (13 figures, 5 tables)

  8. The Waste Isolation Pilot Plant status and related socioeconomic impacts

    International Nuclear Information System (INIS)

    Little, C.C.; Adcock, L.D.; Hohmann, G.L.

    1984-01-01

    The Waste Isolation Pilot Plant (WIPP) has been ''authorized as a defense activity of the Department of Energy...for the express purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States...'' (PL 96-164). As reported in previous conferences, WIPP continues ahead of schedule and below budget with full facility construction well underway. To date, based on recent review, the socioeconomic impacts have been negligible and steps have been taken to ensure that they remain that way throughout operations

  9. A technical pilot plant assessment of flue gas desulfurisation in a circulating fluidised bed

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, F.J.; Ollero, P. [Universidad de Sevilla (Spain). Dept. de Ingenieria Quimica y Ambiental; Cabanillas, A.; Otero, J. [Centro de Investigaciones Energeticas y Medioambientales, (CIEMAT), Madrid (Spain)

    2002-11-01

    Flue gas desulfurisation in a circulating fluidised bed absorber (CFBA) is quite a novel dry desulfurisation technology [6th International Conference on Circulating Fluidised Beds (1999) 601] that shows significant advantages in comparison with other dry technologies and that could also be competitive with the widely-used wet FGD technology. This experimental study analyses the performance of a flue gas treatment plant comprising a CFBA and an electrostatic precipitator (ESP). The most significant aspects considered in this study are: the effect of precollecting the fly ash, the effect of the SO{sub 2} inlet concentration, the effect of power plant load changes, the contribution of the final particulate control equipment to the overall SO{sub 2} removal efficiency and the impact of the desulfurisation unit on the ESP behaviour and its final dust emissions. In addition, the behaviour of the integrated CFBA-ESP system with respect to the main operating parameters was studied by means of a fractional factorial design of experiments. All this experimental work was carried out in a 3-MWe equivalent pilot plant that processes real gases withdrawn from the Los Barrios Power Plant. Processing a flue gas with up to 2000 ppm SO{sub 2} concentration, a sulfur removal of 95-97% with a lime utilisation of 75% was achieved. A simple regression model to evaluate the efficiency of the whole system is also proposed.(author)

  10. Optimization of instant powdered chicken feet broth’s drying temperature and time on pilot plant scale production

    Science.gov (United States)

    Hidayati, N.; Widyaningsih, T. D.

    2018-03-01

    Chicken feet by-product of chicken industries amounted to approximately 65,894 tons/year commonly used as broths. These by-products are potentially produced into an instant form as an anti-inflammatory functional food on industrial scale. Therefore, it is necessary to optimize the critical parameters of the drying process. The aim of this study was to determine the optimum temperature and time of instant powdered chicken feet broth’s drying on pilot plant scale, to find out product’s comparison of the laboratory and pilot plant scale, and to assess financial feasibility of the business plan. The optimization of pilot plant scale’s research prepared and designed with Response Surface Methodology-Central Composite Design. The optimized factors were powdered broth’s drying temperature (55°C, 60°C, 65°C) and time (10 minutes, 11 minutes, 12 minutes) with the response observed were water and chondroitin sulphate content. The optimum condition obtained was drying process with temperature of 60.85°C for 10,05 minutes resulting in 1.90 ± 0.02% moisture content, 32.48 ± 0.28% protein content, 12.05 ± 0.80% fat content, 28.92 ± 0.09 % ash content, 24.64 ± 0.52% carbohydrate content, 1.26 ± 0.05% glucosamine content, 0.99 ± 0.23% chondroitin sulphate content, 50.87 ± 1.00% solubility, 8.59 ± 0.19% water vapour absorption, 0.37% levels of free fatty acid, 13.66 ± 4.49% peroxide number, lightness of 60.33 ± 1.24, yellowness of 3.83 ± 0.26 and redness of 21.77 ± 0.42. Financial analysis concluded that this business project was feasible to run.

  11. Future-oriented computerized information system for power plant process control in a pilot project at Philippsburg nuclear power plant

    International Nuclear Information System (INIS)

    Woehrle, G.; Kraft, M.

    1988-01-01

    The motivation for the pilot project at Philippsburg nuclear power plant resulted from the Three Mile Island accident in 1979. The primary task embraces an efficient computer-aided reduction of information when a fault occurs based on a process engineering analysis of the information accrued. Accompanying this are a consolidation and evaluation of the information available in the control room. In this pilot project the new tasks of status monitoring, information reduction and operationalcontrol have been realized for the first time using a computer-aided process information system. In addition to the existing control computer, an information computer with approximately 1200 analogue and about 10000 binary signals has been installed. The installation of the system was completed in 1984 and in the meantime initial operational experience has become available. (orig.) [de

  12. An overview of performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Jow, Hong-Nian; Anderson, D.R.; Marietta, M.

    1997-01-01

    This paper presents an overview of the methodology used in the recent performance assessment (PA) to support the U.S. Department of Energy (DOE) Carlsbad Area Office's (CAO's) Waste Isolation Pilot Plant (WIPP) Compliance Certification Application (CCA). The results of this recently completed WIPP PA will be presented. Major release modes contributing to the total radionuclide release to the accessible environment will be discussed. Comparison of the mean complementary cumulative distribution function (CCDF) curve against the Environmental Protection Agency (EPA) radionuclide release limits will be presented

  13. Developments in the pre-combustion CO2 capture pilot plant at the Buggenum IGCC

    NARCIS (Netherlands)

    Damen, K.; Gnutek, R.; Kaptein, J.; Nannan, N.R.; Oyarzun, B.; Trapp, C.; Colonna, P.; Van Dijk, E.; Gross, J.; Bardow, A.

    2011-01-01

    N.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a multi-fuel IGCC with CO2 capture and storage (Nuon Magnum) in Eemshaven, the Netherlands. In order to prepare for large-scale application of CO2 capture and storage, a CO2 capture pilot plant is constructed at

  14. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The DOE has mandated in DOE Order 5400.1 that its operations will be conducted in an environmentally safe manner. The Waste Isolation Pilot Plant (WIPP) will comply with DOE Order 5400.1 and will conduct its operations in a manner that ensures the safety of the environment and the public. This document outlines how the WIPP will protect and preserve groundwater within and surrounding the WIPP facility. Groundwater protection is just one aspect of the WIPP environmental protection effort. The WIPP groundwater surveillance program is designed to determine statistically if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will be determined and appropriate corrective action initiated

  15. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  16. Waste Isolation Pilot Plant site environmental report for calendar year 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental impacts and establish baselines for future quantitative environmental impact evaluations. Surface water and groundwater, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include meteorological, air quality, soil properties, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, no waste has been received; therefore, certain elements required by Order DOE 5400.1 are not presented in this report. 15 figs. 19 tabs

  17. Waste Isolation Pilot Plant site environmental report for calendar year 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental impacts and establish baselines for future quantitative environmental impact evaluations. Surface water and groundwater, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include meteorological, air quality, soil properties, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, no waste has been received; therefore, certain elements required by Order DOE 5400.1 are not presented in this report. 15 figs. 19 tabs.

  18. Pilot plant SERSE: Description and results of the experimental tests under treatment of simulated chemical liquid waste

    International Nuclear Information System (INIS)

    Calle, C.; Gili, M.; Luce, A.; Marrocchelli, A.; Pietrelli, L.; Troiani, F.

    1989-11-01

    The chemical processes for the selective separation of the actinides and long lived fission products from aged liquid wastes is described. The SERSE pilot plant is a cold facility which has been designed, by ENEA, for the engineering scale demonstration of the chemical separation processes. The experimental tests carried out in the plant are described and the results confirm the laboratory data. (author)

  19. Pilot-plant for NOx, SO2, HCl removal from flue-gas of municipal waste incinerator by electron beam irradiation

    International Nuclear Information System (INIS)

    Doi, Takeshi; Suda, Shoichi; Morishige, Atsushi; Tokunaga, Okihiro; Aoki, Yasushi; Sato, Shoichi; Komiya, Mikihisa; Hashimoto, Nobuo; Nakajima, Michihiro.

    1992-01-01

    A pilot-Plant for NO x , SO 2 and HCl removal from flue-gas of municipal waste incinerator by electron beam irradiation was designed and its construction at Matsudo City Waste Disposal Center was planned. The flue-gas of 1,000 Nm 3 /hr is guided from the waste incinerator flue-gas line of 30,000 Nm 3 /hr to the Pilot-Plant to be processed by spraying Ca(OH) 2 slurry (NKK-LIMAR Process) and irradiating high-energy electron beam of an accelerator. NO x , SO 2 and HCl are removed simultaneously from the flue-gas by the enhanced reaction with Ca(OH) 2 under irradiation. According to the basic research performed using a small size reactor at TRCRE of JAERI, the electron beam irradiation process was proved to be very effective for these harmful gases removal. Based on this result, the Pilot-Plant was designed for the demonstration of NO x , SO 2 and HCl removal performance using electron accelerator of maximum energy 0.95 MeV and maximum power 15 kW. The designing and planning were promoted by NKK in cooperation with JAERI and Matsudo City. (author)

  20. The study of the maintenance for a cryogenics pilot plant in nuclear regime

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2002-01-01

    The Cryogenic Pilot Plant, CPP, has as goal the extraction of tritium from heavy water at the CANDU Reactors in Cernavoda. Its operation allows a continuos nuclear regime. CPP consists in several modules, each of them implying static and dynamical complex equipment in which fluids circulate at cryogenic temperatures. From these reasons it results that the CPP maintenance is essential. The relational structure regarding the integrated maintenance systems in the whole ICSI's activity is presented in the frame of management decision system and contains a procedural program of maintenance (PPM). PPM includes adoption strategy for maintenance activity in the conditions required by the Manuals worked out in compliance with QA of ICSI and specific regulations of operation in nuclear regime. An explanation based on a thorough analysis is given for the strategy of maintenance, the structure of modules and the use of informatics subsystems. The structure of PPM strategy has a flowchart implying: - Reorganization, Scientific background, and Operative Maintenance strategy (inside/outside strategy) as well as PPM stage realization and specifications for maintenance assurance (manuals, cards and subsystems). Also, provided in the maintenance strategy are the PPM preparatory and proper stage conceptions

  1. Capability of microalgae-based wastewater treatment systems to remove emerging organic contaminants: A pilot-scale study

    OpenAIRE

    Matamoros, Victor; Gutiérrez Martínez, Raquel; Ferrer Martí, Ivet; García Serrano, Joan; Bayona, Josep M.

    2015-01-01

    The effect of hydraulic retention time (HRT) and seasonality on the removal efficiency of 26 organic microcontaminants from urban wastewater was studied in two pilot high-rate algal ponds (HRAPs). The targeted compounds included pharmaceuticals and personal care products, fire retardants, surfactants, anticorrosive agents, pesticides and plasticizers, among others. The pilot plant, which was fed at a surface loading rate of 7-29 g of COD m(-2) d(-1), consisted of a homogenisation tank and two...

  2. The waste isolation pilot plant transuranic waste repository: A case study in radioactive waste disposal safety and risk

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Leif G. [GRAM, Inc., Albuquerque, NM (United States)

    1999-12-01

    The Waste Isolation Pilot Plant (WIPP) deep geological defense-generated transuranic radioactive waste (TRUW) repository in the United States was certified on the 13 of May 1998 and opened on the 26 of March 1999. Two sets of safety/performance assessment calculations supporting the certification of the WIPP TRUW repository show that the maximum annual individual committed effective dose will be 32 times lower than the regulatory limit and that the cumulative amount of radionuclide releases will be at least 10 times, more likely at least 20 times, lower than the regulatory limits. Yet, perceptions remain among the public that the WIPP TRUW repository imposes an unacceptable risk.

  3. The waste isolation pilot plant transuranic waste repository: A case study in radioactive waste disposal safety and risk

    International Nuclear Information System (INIS)

    Eriksson, Leif G.

    1999-01-01

    The Waste Isolation Pilot Plant (WIPP) deep geological defense-generated transuranic radioactive waste (TRUW) repository in the United States was certified on the 13 of May 1998 and opened on the 26 of March 1999. Two sets of safety/performance assessment calculations supporting the certification of the WIPP TRUW repository show that the maximum annual individual committed effective dose will be 32 times lower than the regulatory limit and that the cumulative amount of radionuclide releases will be at least 10 times, more likely at least 20 times, lower than the regulatory limits. Yet, perceptions remain among the public that the WIPP TRUW repository imposes an unacceptable risk

  4. Bentonite as a waste isolation pilot plant shaft sealing material

    International Nuclear Information System (INIS)

    Daemen, J.; Ran, Chongwei

    1996-12-01

    Current designs of the shaft sealing system for the Waste Isolation Pilot Plant (WIPP) propose using bentonite as a primary sealing component. The shaft sealing designs anticipate that compacted bentonite sealing components can perform through the 10,000-year regulatory period and beyond. To evaluate the acceptability of bentonite as a sealing material for the WIPP, this report identifies references that deal with the properties and characteristics of bentonite that may affect its behavior in the WIPP environment. This report reviews published studies that discuss using bentonite as sealing material for nuclear waste disposal, environmental restoration, toxic and chemical waste disposal, landfill liners, and applications in the petroleum industry. This report identifies the physical and chemical properties, stability and seal construction technologies of bentonite seals in shafts, especially in a saline brine environment. This report focuses on permeability, swelling pressure, strength, stiffness, longevity, and densification properties of bentonites

  5. Bentonite as a waste isolation pilot plant shaft sealing material

    Energy Technology Data Exchange (ETDEWEB)

    Daemen, J.; Ran, Chongwei [Univ. of Nevada, Reno, NV (United States)

    1996-12-01

    Current designs of the shaft sealing system for the Waste Isolation Pilot Plant (WIPP) propose using bentonite as a primary sealing component. The shaft sealing designs anticipate that compacted bentonite sealing components can perform through the 10,000-year regulatory period and beyond. To evaluate the acceptability of bentonite as a sealing material for the WIPP, this report identifies references that deal with the properties and characteristics of bentonite that may affect its behavior in the WIPP environment. This report reviews published studies that discuss using bentonite as sealing material for nuclear waste disposal, environmental restoration, toxic and chemical waste disposal, landfill liners, and applications in the petroleum industry. This report identifies the physical and chemical properties, stability and seal construction technologies of bentonite seals in shafts, especially in a saline brine environment. This report focuses on permeability, swelling pressure, strength, stiffness, longevity, and densification properties of bentonites.

  6. Investigations into the operating behavior of separation nozzle cascades for uranium-235 enrichment in a 10-stage pilot plant

    International Nuclear Information System (INIS)

    Bley, P.; Hein, H.; Linder, G.

    1984-03-01

    The separation nozzle method developed by the Karlsruhe Nuclear Research Center is based on the centrifugal force in a curved jet consisting of uranium hexafluoride and a light auxiliary gas. To determine in experiments the operating and controlling behavior of separation nozzle cascades a 10-stage pilot plant was erected some year ago. This plant was transferred to the Centro de Desenvolvimento da Tecnologia Nuclear (CDTN) in Belo Horizonte as a donation made within the framework of the German-Brazilian Agreement on scientific cooperation in the field of uranium enrichment. The plant previously equipped with single deflection systems was modified to operate with the double deflection system envisaged for commercial plants. A controlling concept meanwhile developed and improved for separation nozzle cascades equipped with single and double deflection systems was verified experimentally and optimized at the pilot plant of the CDTN. A comparison of the experimental operating behavior with the operating behavior calculated by simulation programs has confirmed the faithfulness of simulation of the computer codes developed to apply to cascades with double deflection systems as well. (orig.) [de

  7. Final Remedial Investigation Sampling Plan Addendum. Milan Army Ammunition Plant Remedial Investigation Southern Study Area (Operable Unit No. 5)

    Science.gov (United States)

    1997-09-01

    91-D-0012 Task Order No. 0007 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996 .. .............................. 2-28 2.5...indicated that heavy metal contamination (lead, chromium, and mercury ) was present at relatively low levels, and explosive contamination was limited to...and MI172 where lead was found at 22.9 j.g/1 and 18.4 Ig/l, respectively. 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996

  8. Biodiesel production from vegetable oil and waste animal fats in a pilot plant.

    Science.gov (United States)

    Alptekin, Ertan; Canakci, Mustafa; Sanli, Huseyin

    2014-11-01

    In this study, corn oil as vegetable oil, chicken fat and fleshing oil as animal fats were used to produce methyl ester in a biodiesel pilot plant. The FFA level of the corn oil was below 1% while those of animal fats were too high to produce biodiesel via base catalyst. Therefore, it was needed to perform pretreatment reaction for the animal fats. For this aim, sulfuric acid was used as catalyst and methanol was used as alcohol in the pretreatment reactions. After reducing the FFA level of the animal fats to less than 1%, the transesterification reaction was completed with alkaline catalyst. Due to low FFA content of corn oil, it was directly subjected to transesterification. Potassium hydroxide was used as catalyst and methanol was used as alcohol for transesterification reactions. The fuel properties of methyl esters produced in the biodiesel pilot plant were characterized and compared to EN 14214 and ASTM D6751 biodiesel standards. According to the results, ester yield values of animal fat methyl esters were slightly lower than that of the corn oil methyl ester (COME). The production cost of COME was higher than those of animal fat methyl esters due to being high cost biodiesel feedstock. The fuel properties of produced methyl esters were close to each other. Especially, the sulfur content and cold flow properties of the COME were lower than those of animal fat methyl esters. The measured fuel properties of all produced methyl esters met ASTM D6751 (S500) biodiesel fuel standards. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Computer simulation of the off gas treatment process for the KEPCO pilot vitrification plant

    International Nuclear Information System (INIS)

    Kim, Hey Suk; Maeng, Sung Jun; Lee, Myung Chan

    1999-01-01

    Vitrification technology for treatment of low and intermediate radioactive wastes can remarkably reduce waste volume to about one twentieth of the initial volume as they are collected and converted into a very stable form. Therefore, it can minimize environmental impact when the vitrified waste is disposed of. But an off gas treatment system is necessary to apply this technology because air pollutants and radioisotopes are generated like those of other conventional incinerators during thermal oxidation process at high temperature. KEPCO designed and installed a pilot scale vitrification plant to demonstrate the feasibility of the vitrification process and then to make a conceptual design for a commercial vitrification facility. The purpose of this study was to simulate the off gas treatment system(OGTS) in order optimize the operating conditions. Mass balance and temperature profile in the off gas treatment system were simulated for different combinations of combustible wastes by computer simulation code named OGTS code and removal efficiency of each process was also calculated with change of design parameters. The OGTS code saved efforts,time and capital because scale and configuration of the system could be easily changed. The simulation result of the pilot scale off gas process as well as pilot tests will be of great use in the future for a design of the commercial vitrification facility. (author)

  10. Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

  11. Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

  12. HTGR fuel reprocessing pilot plant: results of the sequential equipment operation

    International Nuclear Information System (INIS)

    Strand, J.B.; Fields, D.E.; Kergis, C.A.

    1979-05-01

    The second sequential operation of the HTGR fuel reprocessing cold-dry head-end pilot plant equipment has been successfully completed. Twenty standard LHGTR fuel elements were crushed to a size suitable for combustion in a fluid bed burner. The graphite was combusted leaving a product of fissile and fertile fuel particles. These particles were separated in a pneumatic classifier. The fissile particles were fractured and reburned in a fluid bed to remove the inner carbon coatings. The remaining products are ready for dissolution and solvent extraction fuel recovery

  13. No-migration variance petition for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Duff, M.; Carnes, R.; Hart, J.; Hansen, R.

    1991-01-01

    The US Department of Energy (DOE) is petitioning the US Environmental Protection Agency (EPA) to allow the emplacement of hazardous wastes subject to the Resource Conservation and Recovery Act (RCRA) land disposal restrictions in the Waste Isolation Pilot Plant (WIPP). The basis of the petition is that there will be no migration of hazardous constituents from the repository for as long as the wastes remain hazardous. The EPA regulations in 40 CFR Section 268.6 identify specific criteria that must be addressed in making a demonstration of no migration. EPA's approval of this petition will allow the WIPP facility to accept wastes otherwise prohibited or restricted from land disposal. 5 refs

  14. Optimisation of a wet FGD pilot plant using fine limestone and organic acids

    DEFF Research Database (Denmark)

    Frandsen, Jan; Kiil, Søren; Johnsson, Jan Erik

    2001-01-01

    , but the residual limestone content in the gypsum increased to somewhere between 19 and 30 wt%, making this pH range unsuitable for use in a full-scale plant. The investigations have shown that both the addition of organic acids and the use of a limestone with a fine PSD can be used to optimise wet FGD plants. (C......The effects of adding an organic acid or using a limestone with a fine particle size distribution (PSD) have been examined in a wet flue gas desulphurisation (FGD) pilot plant. Optimisation of the plant with respect to the degree of desulphurisation and the residual limestone content of the gypsum...... has been the aim of the work. In contrast to earlier investigations with organic acids, all essential process parameters (i.e. gas phase concentration profiles of SO(2), slurry pH profiles. and residual limestone in the gypsum) were considered. Slurry concentrations of adipic acid in the range of 0...

  15. Demonstration test of electron beam flue gas treatment pilot plant of a coal fired thermal power station

    International Nuclear Information System (INIS)

    Doi, Yoshitaka; Hayashi, Kazuaki; Izutsu, Masahiro; Watanabe, Shigeharu; Namba, Hideki; Tokunaga, Okihiro; Hashimoto, Shoji; Tanaka, Tadashi; Ogura, Yoshimi.

    1995-01-01

    The Japan Atomic Energy Research Institute, Chubu Electric Power Company and Ebara Corporation jointly constructed a pilot plant for electron beam flue gas treatment (dry process) capable of treating 12,000 m 3 /h (NTP) of flue gas from a coal fired boiler, at Shin-Nagoya Thermal Power Station, Chubu Electric Power Company. Various tests carried out at the plant over a period extending one year verified the followings. By appropriately controlling parameters such as electron beam dosage, flue gas temperature, and ammonia stoichiometric amount, highly efficient simultaneous SO 2 and NOx removal from flue gas was achieved under all gas conditions, equal to or more efficient than that by the highest level conventional treatment. The operation of the pilot plant was stable and trouble-free over a long term, and the operation and the process was easy to operate and control. By-products (ammonium sulfate and ammonium nitrate) produced by the flue gas treatment were proven to have superior quality, equivalent to that of market-available nitrogen fertilizers. These by-products had been registered as by-product nitrogen fertilizers. (author)

  16. Design of a Small Scale Pilot Biodiesel Production Plant and Determination of the Fuel Properties of Biodiesel Produced With This Plant

    Directory of Open Access Journals (Sweden)

    Tanzer Eryılmaz

    2014-09-01

    Full Text Available A small scale pilot biodiesel production plant that has a volume of 65 liters/day has been designed, constructed and tested. The plant was performed using oil mixture (50% wild mustard seed oil + 50% refined canola oil and methanol with sodium hydroxide (NaOH catalyst. The fuel properties of biodiesel indicated as density at 15oC (889.64 kg/m3, kinematic viscosity at 40oC (6.975 mm2/s, flash point (170oC, copper strip corrosion (1a, water content (499.87 mg/kg, and calorific value (39.555 MJ/kg, respectively.

  17. Development of technology for brown coal liquefaction. Design, construction and operation of pilot plant; development of 50t/d pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    As for the development of 50t/d pilot plant for the development of liquefaction plant of Victorian brown coal in Austraria, outline of the contents about the second stage construction following the first stage construction up to this time is reported from the following 4 viewpoints; 1: design of process apparatuses, 2: manufacture of apparatuses, 3: fieldwork of the construction and 4: operation of the first stage facilities. On the first item the outline of detail design made by Japanese and Australian companies is described. On the second item the acceptance of purchasing goods from Japan and Australia and the condition of inspection and quality assurance to specific principal parts are described. On the third item the supplementary construction of the first stage, contents of constructions of the second stage are described. On the fourth item, preparation for operation, target, the whole circumstances and the results of maintenance, especially review of operation technique, training of operators, and occurrence and repair of troubles are described. As other relevant works, envirommental assessment, waste disposal, enviromental monitoring for exhaust gases, drainage and working enviroments, safety measure, educational training and moreover activities for local district people and the state of labor market as the support for execution of the project are described.

  18. FY 1991 report on the results of the development of the entrained bed coal gasification power plant. Part 1. Element study/investigational study of technology/study of the integrated coal gasification combined cycle power system; 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Youso kenkyu hen, gijutsu chosa hen, sekitan gaska fukugo hatsuden system kento hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    For the purpose of establishing the technology of integrated coal gasification combined cycle power generation, the following were conducted: element study of a 200t/d entrained bed coal gasification pilot plant, survey of technology of the coal gasification power generation, study of the practical scale IGCC, etc. The FY 1991 results were summarized. In the gasification test using 2t/d furnace equipment, evaluation test on the test coal for pilot plant was made. In the study of gas turbine combustor for demonstration machine use, measuring duct was fabricated for measurement of combustion gas temperature/pressure, etc. In the simulational study of the total system of combined cycle power generation, review/modification of part of the simulation model and detailing of the model were conducted by comparison with the data on pilot plant operation. In the technology study, joint technology conferences were held for discussions between Japan and Australia, Japan and the U.S., and Japan and Canada. As to the practical scale IGCC, the initially planned output capacity and thermal efficiency were studied based on the knowledge/information obtained through the R and D on the 200t/d pilot plant. (NEDO)

  19. Test operation of the uranium ore processing pilot plant and uranium conversion plant

    International Nuclear Information System (INIS)

    Suh, I.S.; Lee, K.I.; Whang, S.T.; Kang, Y.H.; Lee, C.W.; Chu, J.O.; Lee, I.H.; Park, S.C.

    1983-01-01

    For the guarantee of acid leaching process of the Uranium Ore Processing Pilot Plnat, the KAERI team performed the test operation in coorperation with the COGEMA engineers. The result of the operation was successful achieving the uranium leaching efficiency of 95%. Completing the guarentee test, a continuous test operation was shifted to reconform the reproducibility of the result and check the functions of every units of the pilot plant feeding the low-grade domestic ore, the consistency of the facility was conformed that the uranium can easily be dissolved out form the ore between the temperature range of 60degC-70degC for two hours of leaching with sulfuric acid and could be obtained the leaching efficiency of 92% to 95%. The uranium recovery efficiencies for the processes of extraction and stripping were reached to 99% and 99.6% respectively. As an alternative process for the separation of solid from the ore pulp, four of the Counter Current Decanters were shifted replacing the Belt Filter and those were connected in a series, which were not been tested during the guarantee operation. It was found out that the washing efficiencies of the ore pulp in each tests for the decanters were proportionally increased according to the quantities of the washing water. As a result of the test, it was obtained that washing efficiencies were 95%, 85%, 83% for the water to ore ratio of 3:1, 2:1, 1.5:1 respectively. (Author)

  20. Achievement report for fiscal 1993 on developing entrained bed coal gasification power plant. Part 2. Summary of tests and researches on pilot plant operation; 1993 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant unten shiken kenkyu no gaiyo hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Tests and researches have been carried out on operation of a 200-t/d entrained bed coal gasification pilot plant built with an objective of establishing the coal gasification composite power generation technology. This paper summarizes the achievements in fiscal 1993. The current fiscal year has performed the test operation on the pilot plant as a whole by using the coal D in continuation from the previous fiscal year. For the gasification furnace facilities, an air variation test was conducted for charging coal into the gasification furnace by using recovered oxygen, wherein satisfactory control was verified on oxygen concentration in the air supplied into the gasification furnace. In the gas refining facilities (dry desulfurizing facilities), the total sulfur concentration at 300 to 650 ppm in the gas produced from the coal gasification furnace was refined to 30 to 100 ppm, having achieved the initial target value. The gas refining facilities (dry dust collecting facilities) have achieved satisfactory result that the entrance dust concentration at 66 to 270 mg/Nm{sup 3} was reduced to the exit dust concentration at 1 to 3 mg/Nm{sup 3}. With respect to the gas turbine facilities, the planned values of output and thermal efficiency were satisfied, having derived good performance characteristics. (NEDO)

  1. A pilot study on the determination of performance indicator threshold values for domestic nuclear power plants using risk-informed approach

    International Nuclear Information System (INIS)

    Kang, D. I.; Kim, K. Y.; Park, J. H.; Hwang, M. J.; Ha, J. J.; Sung, K. Y.

    2004-01-01

    In this paper, a pilot study on the determination of the performance indicator (PI) threshold values of the unplanned reactor scram and the unavailability of safety systems for domestic nuclear power plants (NPPs) has been performed using risk-informed approach. The crtiteria of core damage frequency changes (ΔCDF) in the RG 1.174, which has been used for the risk-informed decisionmaking, were adopted as the basic criteria for the dermination of the PI threshold values. The PI threshold values of the unplanned reactor scram (URS) were determined on the assumptions that the the initiating event frequencies are changed and their conditional core damage probabilities are constant. The PI threshold values of the safety system unavailabilities were determined using the Fussel-Vesely importance, CDF, and ΔCDF. The study results for two domestic NPPs show that the PI threshold values of the URS are greatly dependent on the methodology of initiating event analysis and those of safety system unavailabilities currently used are somewhat conservatively set up

  2. Analytical technology in support of the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Villareal, R.

    1994-01-01

    The need for long-term disposal of defense-related transuranic (TRU) wastes became apparent as the DOE recognized the environmental consequences of maintaining waste storage facilities designed for short or interim storage periods, not long-term storage. In 1979, Congress authorized the Waste Isolation Pilot Plant (WIPP), a research and development facility and full-scale pilot plant, to demonstrate the safe management, storage, and disposal of TRU wastes. Environmental Protection Agency (EPA) regulations governing disposal of TRU wastes in 40 CFR 191 require that TRU waste disposal systems be designed to limit migration of radionuclides to the accessible environment for 10,000 years based on performance assessment results. The actinide source-term waste test program (STTP) is an experiment designed to quantitatively measure the time-dependent concentrations of plutonium, uranium, neptunium, thorium, and americium in TRU wastes immersed in brines that simulate the chemistry that may occur in WIPP disposal rooms, partially or completely contacted with brines. The total concentration of each actinide in brine is the sum of its dissolved and colloidally suspended components, as determined by variables including pcH, oxidation-reduction potential (Eh), chelating and complexing agents, sorption capacity, and colloidal suspension capabilities. To determine the effect of influencing variables on the concentration of actinides in WIPP brines, several TRU waste types will be characterized and loaded into specially designed noncorrosive test containers filled with brine containing additives to enhance the action of each influencing variable. The test container brine and headspace gases will be analyzed

  3. Thermal sludge treatment. Pilot project on the possibilities and marginal conditions; Thermische slibontsluiting. Pilot-onderzoek naar de mogelijkheden en randvoorwaarden

    Energy Technology Data Exchange (ETDEWEB)

    Berkhof, D.; Koornneef, E.; Janus, H. [Royal Haskoning DHV, Amersfoort (Netherlands)

    2012-09-15

    As part of the agreements within the framework of the Dutch Green Deal between Water Boards and the Ministry of Economic Affairs, Agriculture and Innovation (ELI) a research program has been set up which addresses the implementation of new developments that can improve energy efficiency in the treatment of waste water. Attention is paid to supercritical gasification, supercritical oxidation and conventional gasification. The study on conventional gasification is split into two phases: research into the economic feasibility in combination with TDH (thermal pressure hydrolysis) and drying, and next to that a pilot plant. This report concerns phase 2: pilot projects on thermal sewage treatment [Dutch] Als onderdeel van de afspraken in het kader van de Green Deal tussen Waterschappen en het ministerie van ELI is een onderzoeksprogramma opgesteld gericht op het implementeren van nieuwe ontwikkelingen die de energie efficientie bij de verwerking van afvalwater kunnen verbeteren. Daarbij wordt gekeken naar superkritische vergassing en oxidatie en naar conventionele vergassing. De studie naar conventionele vergassing is gesplitst in 2 fasen: onderzoek naar de economische haalbaarheid in combinatie met TDH (thermische druk hydrolyse), en drogen en daarnaast een onderzoek op pilot plant/praktijkschaal. In de onderhavige rapportage wordt fase 2, het onderzoek op pilot plant/praktijkschaal naar thermische slibontsluiting (TSO) beschreven.

  4. Reconsolidation of salt as applied to permanent seals for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Hansen, F.D.; Callahan, G.D.; Van Sembeek, L.L.

    1993-01-01

    Reconsolidated salt is a fundamental component of the permanent seals for the Waste Isolation Pilot Plant. As regulations are currently understood and seal concepts envisioned, emplaced salt is the sole long-term seal component designed to prevent the shafts from becoming preferred pathways for rating gases or liquids. Studies under way in support of the sealing function of emplaced salt include laboratory testing of crushed salt small-scale in situ tests, constitutive modeling of crushed salt, calculations of the opening responses during operation and closure, and design practicalities including emplacement techniques. This paper briefly summarizes aspects of these efforts and key areas of future work

  5. FY 1992 report on the results of the development of an entrained bed coal gasification power plant. Part 4. Operation of pilot plant; 1992 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-01

    A record was summarized of the operation test study in FY 1992 of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation. The operating hour of gasifier facilities in FY 1992 was 635 hours 19 minutes, and the number of times of gasification operation was 9. The operating hour of letting gas through to gas refining facilities was 549 hours 14 minutes. The operating hour of gas turbine facilities was 310 hours 18 minutes, and the generated output was 1,366.2 MWh. The operating hour of treatment furnace of safety environment facilities was 1,401 hours 4 minutes, and that of the denitrification system was 621 hours 24 minutes. As to the actual results of the start-up/stop, the paper detailedly recorded those of RUNs 10, 11, 12, 13 and D1. Further, operation manuals were made for the schedule of plant start-up/stop, gasifier facilities, gas refining facilities (dry desulfurization facilities), gas refining facilities (dry dedusting facilities), actual pressure/actual size combustor testing facilities and safety environment facilities. (NEDO)

  6. Perspective of the Science Advisor to the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    WEART, WENDELL D.

    1999-01-01

    In 1975 Sandia National Laboratories (SNL) was asked by the predecessor to the Department of Energy to assume responsibility for the scientific programs necessary to assure the safe and satisfactory development of a geologic repository in the salt beds of southeast New Mexico. Sandia has continued in the role of Science Advisor to the Waste Isolation Pilot Plant (WIPP) to the present time. This paper will share the perspectives developed over the past 25 years as the project was brought to fruition with successful certification by the Environmental Protection Agency (EPA) on May 13, 1998 and commencement of operations on April 26, 1999

  7. Radioactive waste disposal: Waste Isolation Pilot Plants (WIPP). March 1978-November 1989 (Citations from the NTIS data base). Report for Mar 78-Nov 89

    International Nuclear Information System (INIS)

    1990-01-01

    This bibliography contains citations concerning the Waste Isolation Pilot Plant (WIPP), a geologic repository located in New Mexico for transuranic wastes generated by the U.S. Government. Articles follow the development of the program from initial site selection and characterization through construction and testing, along with research programs on environmental impacts, structural design, and radionuclide landfill gases. Existing plants and facilities, pilot plants, migration, rock mechanics, economics, regulations, and transport of wastes to the site are also included. The Salt Repository Project and the Crystalline Repository Project are referenced in related published bibliographies. (Contains 184 citations fully indexed and including a title list.)

  8. Solar pilot plant, phase I. Quarterly report No. 1, July--December 1975

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-02-20

    Honeywell Inc. is investigating the technical and economic feasibility of generating electricity from solar energy. During the first 6 months of the program (1 July--31 December 1975), a preliminary design baseline for a 10-MW(e) solar pilot plant was generated and analyzed. Subsequently, several changes were made to improve performance and/or reduce cost. Conceptual designs and research experiments were generated for three key subsystems--collector, steam generator, and thermal storage. Limited testing was done to study the problem of removing eutectic salts from vaporizer tubes in the thermal storage subsystem. The program was on schedule at the end of 1975. Plans for the first quarter of 1976 include ordering long-leadtime items for the subsystem research experiments, continuing analysis of the conceptual designs preparatory to detailing them, and continuing engineering model experiments.

  9. 10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-18

    Bid documents are provided for the construction of the collector subsystem foundation of the Barstow Solar Pilot Plant, including invitation to bid, bid form, representations and certifications, construction contract, and labor standards provisions of the Davis-Bacon Act. Instructions to bidders, general provisions and general conditions are included. Technical specifications are provided for the construction. (LEW)

  10. Waste isolation pilot plant disposal room model

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, B.M.

    1997-08-01

    This paper describes development of the conceptual and mathematical models for the part of the Waste Isolation Pilot Plant (WIPP) repository performance assessment that is concerned with what happens to the waste over long times after the repository is decommissioned. These models, collectively referred to as the {open_quotes}Disposal Room Model,{close_quotes} describe the repository closure process during which deformation of the surrounding salt consolidates the waste. First, the relationship of repository closure to demonstration of compliance with the Environmental Protection Agency (EPA) standard (40 CFR 191 Appendix C) and how sensitive performance results are to it are examined. Next, a detailed description is provided of the elements of the disposal region, and properties selected for the salt, waste, and other potential disposal features such as backfill. Included in the discussion is an explanation of how the various models were developed over time. Other aspects of closure analysis, such as the waste flow model and method of analysis, are also described. Finally, the closure predictions used in the final performance assessment analysis for the WIPP Compliance Certification Application are summarized.

  11. Waste isolation pilot plant disposal room model

    International Nuclear Information System (INIS)

    Butcher, B.M.

    1997-08-01

    This paper describes development of the conceptual and mathematical models for the part of the Waste Isolation Pilot Plant (WIPP) repository performance assessment that is concerned with what happens to the waste over long times after the repository is decommissioned. These models, collectively referred to as the open-quotes Disposal Room Model,close quotes describe the repository closure process during which deformation of the surrounding salt consolidates the waste. First, the relationship of repository closure to demonstration of compliance with the Environmental Protection Agency (EPA) standard (40 CFR 191 Appendix C) and how sensitive performance results are to it are examined. Next, a detailed description is provided of the elements of the disposal region, and properties selected for the salt, waste, and other potential disposal features such as backfill. Included in the discussion is an explanation of how the various models were developed over time. Other aspects of closure analysis, such as the waste flow model and method of analysis, are also described. Finally, the closure predictions used in the final performance assessment analysis for the WIPP Compliance Certification Application are summarized

  12. Resource Conservation and Recovery Act, Part B permit application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 11, Chapter D, Appendix D4--Chapter D, Appendix D17: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This volume contains appendices D4 through D17 which cover the following: Waste Isolation Pilot Plant site environmental report; ecological monitoring program at the Waste Isolation Pilot Plant; site characterization; regional and site geology and hydrology; general geology; dissolution features; ground water hydrology; typical carbon sorption bed efficiency; VOC monitoring plan for bin-room tests; chemical compatibility analysis of waste forms and container materials; probable maximum precipitation; WHIP supplementary roof support system room 1, panel 1; and corrosion risk assessment of the Waste Isolation Pilot Plant ``humid`` test bins.

  13. Physical and chemical characteristics of fluorinel/sodium calcine generated during 30 cm Pilot-Plant Run 17

    International Nuclear Information System (INIS)

    Brewer, K.N.; Kessinger, G.F.; Littleton, L.L.; Olson, A.L.

    1993-07-01

    The 30 centimeter (cm) pilot plant calciner Run 17, of March 9, 1987, was performed to study the calcination of fluroinel-sodium blended waste blended at the ratio 3.5:1 fluorinel to sodium, respectively. The product of the run was analyzed by a variety of analytical techniques that included X-ray powder diffraction (XRD), inductively coupled plasma spectroscopy (ICP), scanning electron microscopy (SEM), and X-ray photoelectron spectroscopy (XPS) to deduce physical and chemical characteristics. The analytical data, as well as data analyses and conclusions drawn from the data, are presented

  14. Arsenic pilot plant operation and results:Weatherford, Oklahoma.

    Energy Technology Data Exchange (ETDEWEB)

    Aragon, Malynda Jo; Arora, H. (Narasimhan Consulting Services Inc., Phoenix, Arizona); Karori, Saqib (Narasimhan Consulting Services Inc., Phoenix, Arizona); Pathan, Sakib (Narasimhan Consulting Services Inc., Phoenix, Arizona)

    2007-05-01

    Narasimhan Consulting Services, Inc. (NCS), under a contract with the Sandia National Laboratories (SNL), designed and operated pilot scale evaluations of the adsorption and coagulation/filtration treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The pilot evaluation was conducted at Well 30 of the City of Weatherford, OK, which supplies drinking water to a population of more than 10,400. Well water contained arsenic in the range of 16 to 29 ppb during the study. Four commercially available adsorption media were evaluated side by side for a period of three months. Both adsorption and coagulation/filtration effectively reduced arsenic from Well No.30. A preliminary economic analysis indicated that adsorption using an iron oxide media was more cost effective than the coagulation/ filtration technology.

  15. Hydrogeochemical studies of the Rustler Formation and related rocks in the Waste Isolation Pilot Plant Area, Southeastern New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Siegel, M.D.; Lambert, S.J.; Robinson, K.L. (eds.)

    1991-08-01

    Chemical, mineralogical, isotopic, and hydrological studies of the Culebra dolomite member of the Rustler Formation and related rocks are used to delineate hydrochemical facies and form the basis for a conceptual model for post-Pleistocene groundwater flow and chemical evolution. Modern flow within the Culebra in the Waste Isolation Pilot Plant (WIPP) area appears to be largely north-to-south; however, these flow directions under confined conditions are not consistent with the salinity distribution in the region surrounding the WIPP Site. Isotopic, mineralogical, and hydrological data suggest that vertical recharge to the Culebra in the WIPP area and to the immediate east and south has not occurred for several thousand years. Eastward increasing {sup 234}U/{sup 238}U activity ratios suggest recharge from a near-surface Pleistocene infiltration zone flowing from the west-northwest and imply a change in flow direction in the last 30,000 to 12,000 years. 49 refs., 34 figs., 4 tabs.

  16. Hydrogeochemical studies of the Rustler Formation and related rocks in the Waste Isolation Pilot Plant Area, Southeastern New Mexico

    International Nuclear Information System (INIS)

    Siegel, M.D.; Lambert, S.J.; Robinson, K.L.

    1991-08-01

    Chemical, mineralogical, isotopic, and hydrological studies of the Culebra dolomite member of the Rustler Formation and related rocks are used to delineate hydrochemical facies and form the basis for a conceptual model for post-Pleistocene groundwater flow and chemical evolution. Modern flow within the Culebra in the Waste Isolation Pilot Plant (WIPP) area appears to be largely north-to-south; however, these flow directions under confined conditions are not consistent with the salinity distribution in the region surrounding the WIPP Site. Isotopic, mineralogical, and hydrological data suggest that vertical recharge to the Culebra in the WIPP area and to the immediate east and south has not occurred for several thousand years. Eastward increasing 234 U/ 238 U activity ratios suggest recharge from a near-surface Pleistocene infiltration zone flowing from the west-northwest and imply a change in flow direction in the last 30,000 to 12,000 years. 49 refs., 34 figs., 4 tabs

  17. FY 1991 report on the results of the development of an entrained bed coal gasification power plant. Part 4. Operation of pilot plant; 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    A record was summarized of the operation of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation. As to the actual results of operation hours, the paper summarized the records of gasifier facilities, gas refining facilities, gas turbine facilities and safety environment facilities which were collected from April 1991 to January 1993. Relating to the actual results of start-up/stop, the paper summarized the records of gasifier facilities, gas refining facilities (desulfurization), gas refining facilities (dedusting), gas turbine facilities and safety environment facilities. Further, operation manuals were made for the schedule of plant start-up/stop, generalization, gasifier facilities, gas refining facilities (desulfurization), gas refining facilities (dedusting), gas turbine facilities, actual pressure/actual size combustor testing facilities and safety environment facilities. (NEDO)

  18. PROJECT MANAGEMENT MATURITY: AN ASSESSMENT OF MATURITY FOR DEVELOPING PILOT PLANTS

    Directory of Open Access Journals (Sweden)

    H.K. Mittermaier

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Despite the current economic climate, the South African mining and engineering industry is experiencing a very promising future, with a large number of capital projects in the offing. It is inevitable that pilot plant development will form part of this future as a risk mitigation technique. This study found that, even though the terms ‘pilot plant’ and ‘project management maturity’ are familiar within the industry, no link between these two could be found in the literature. A number of maturity models exist; and one developed by PMSolutions was selected to perform an assessment of the current level of project management maturity within the South African mining and engineering industry pertaining to the development of pilot plants. The Delphi technique was used to determine the views of experts in the South African mining, mineral processing, petrochemical, nuclear, and mechanical sectors regarding this maturity. A significant difference was observed between the current level of maturity and the required level of maturity in all but one of the nine knowledge areas defined by the Project Management Institute. The two knowledge areas of project time and risk management showed significant differences between current and required maturity levels, and were identified as key areas for improvement.

    AFRIKAANSE OPSOMMING: Ten spyte van die huidige ekonomiese klimaat ondervind die Suid-Afrikaanse mynbou- en ingenieursbedryf ’n baie bemoedigende toekoms, met ’n groot aantal kapitaalprojekte in die vooruitsig. Ten einde risiko’s te verlaag, sal die ontwikkeling van loodsaanlegte noodwendig deel van hierdie toekoms uitmaak. Daar is gevind dat, alhoewel die terme ‘loodsaanleg’ en ‘projekbestuur volwassenheid’ in die nywerheid bekend is, geen skakeling van hierdie twee terme in die literatuur opgespoor kon word nie. ’n Aantal volwassenheid modelle bestaan; en een wat deur PMSolutions ontwikkel is, is gekies om

  19. Fissile material holdup monitoring in the PREPP [Process Experimental Pilot Plant] process

    International Nuclear Information System (INIS)

    Becker, G.K.; Pawelko, R.J.

    1989-01-01

    The Process Experimental Pilot Plant (PREPP) is an incineration system designed to thermally process mixed transuranic (TRU) waste and TRU contaminated low-level waste. The TRU isotopic composition is that of weapons grade plutonium (Pu) which necessitates that criticality prevention measures by incorporated into the plant design and operation. Criticality safety in the PREPP process is assured through the utilization of mass and moderation control in conjunction with favorable vessel geometries. The subject of this paper concerns the Pu mass holdup instrumentation system which is an integral part of the inprocess mass control strategy. Plant vessels and components requiring real-time mass holdup measurements were selected based on their evaluated potential for achieving physically credible Pu mass loadings and associated parameters which could lead to a criticality event. If the parameters requisite to a criticality occurrence could not physically be achieved under credible plant conditions, the particular location only required periodic portable holdup monitoring. Based on these analyses five real-time holdup monitoring locations were identified for criticality assurance purposes. An additional real-time instrument is part of the system but serves primarily in the capacity of providing operational support data. 1 fig

  20. Production characteristics of lettuce Lactuca sativa L. in the frame of the first crop tests in the Higher Plant Chamber integrated into the MELiSSA Pilot Plant

    Science.gov (United States)

    Tikhomirova, Natalia; Lawson, Jamie; Stasiak, Michael; Dixon, Mike; Paille, Christel; Peiro, Enrique; Fossen, Arnaud; Godia, Francesc

    Micro-Ecological Life Support System Alternative (MELiSSA) is an artificial closed ecosystem that is considered a tool for the development of a bioregenerative life support system for manned space missions. One of the five compartments of MELiSSA loop -Higher Plant Chamber was recently integrated into the MELiSSA Pilot Plant facility at Universitat Aut`noma deo Barcelona. The main contributions expected by integration of this photosynthetic compartment are oxygen, water, vegetable food production and CO2 consumption. Production characteristics of Lactuca sativa L., as a MELiSSA candidate crop, were investigated in this work in the first crop experiments in the MELiSSA Pilot Plant facility. The plants were grown in batch culture and totaled 100 plants with a growing area 5 m long and 1 m wide in a sealed controlled environment. Several replicates of the experiments were carried out with varying duration. It was shown that after 46 days of lettuce cultivation dry edible biomass averaged 27, 2 g per plant. However accumulation of oxygen in the chamber, which required purging of the chamber, and decrease in the food value of the plants was observed. Reducing the duration of the tests allowed uninterrupted test without opening the system and also allowed estimation of the crop's carbon balance. Results of productivity, tissue composition, nutrient uptake and canopy photosynthesis of lettuce regardless of test duration are discussed in the paper.

  1. Lipase-catalyzed biodiesel production from waste activated bleaching earth as raw material in a pilot plant.

    Science.gov (United States)

    Park, Enoch Y; Sato, Masayasu; Kojima, Seiji

    2008-05-01

    The production of fatty acid methyl esters (FAMEs) from waste activated bleaching earth (ABE) discarded by the crude oil refining industry using lipase from Candida cylindracea was investigated in a 50-L pilot plant. Diesel oil or kerosene was used as an organic solvent for the transesterification of triglycerides embedded in the waste ABE. When 1% (w/w) lipase was added to waste ABE, the FAME content reached 97% (w/w) after reaction for 12 h at 25 degrees C with an agitation rate of 30 rpm. The FAME production rate was strongly dependent upon the amount of enzyme added. Mixtures of FAME and diesel oil at ratios of 45:55 (BDF-45) and 35:65 (BDF-35) were assessed and compared with the European specifications for biodiesel as automotive diesel fuel, as defined by pr EN 14214. The biodiesel quality of BDF-45 met the EN 14214 standard. BDF-45 was used as generator fuel, and the exhaust emissions were compared with those of diesel oil. The CO and SO2 contents were reduced, but nitrogen oxide emission increased by 10%. This is the first report of a pilot plant study of lipase-catalyzed FAME production using waste ABE as a raw material. This result demonstrates a promising reutilization method for the production of FAME from industrial waste resources containing vegetable oils for use as a biodiesel fuel.

  2. Operation of a pilot plant for the maize desinfestation by irradiation

    International Nuclear Information System (INIS)

    Piedad Beneitez, A. de la.

    1975-01-01

    The paper describes the components and the operation of a pilot plant for radiation disinfestation of maize that has been set up at the Van de Graaff Accelerator Laboratory of the Physics Institute (Mexican National Autonomous University). The Laboratory is operated jointly by the Physics Institute and Technology Programme (National Nuclear Energy Institute). A section is included on the fundamentals and terminology relating to the applications of radiation. The present status of radiation disinfestation of maize in other countries is described, together with what has been achieved at this Laboratory. Another section deals in detail with the main components of the plant and its operation. Finally, the authors describe the experiments carried out with the plant to establish optimum conditions of operation prior to the irradiation of maize on a major scale. One such experiment involved determining the uniformity of the beam over the irradiation zone, for which purpose polyvinyl chloride films were used as dosimeters. The dose received by the maize in a single run past the irradiation head was likewise determined from the thermoluminescent response of powdered lithium fluoride irradiated in capsules along with the maize kernels. (author)

  3. Pilot plant experiments for baking of anode blocks in electrically heated ovens

    Energy Technology Data Exchange (ETDEWEB)

    Grjotheim, K. (Oslo Univ. (Norway). Dept. of Chemistry); Kvande, H. (Hydro Aluminium AS, Stabekk (Norway)); Naixiang, F.; Shiheng, Z.; An, L.; Guangxia, H. (Northeast Univ. of Technology, Shenyang, LN (China). Dept. of Non-Ferrous Metallurgy)

    1990-04-01

    Pilot plant experiments were made to bake anode blocks in electrically heated baking ovens. About 70% of the baked anodes had a specific electrical resistance between 35 and 60 {Omega}xmm{sup 2}xm{sup -1}. About 25% had higher resistances, and these were returned to the baking ovens and used as heating elements in the next baking cycle. The average electrical energy consumption was 1430 kWh per tonne of anodes produced, which is about only 60% of the energy consumption in classical oil or gas-fired baking ovens. (orig.).

  4. Pilot plant experience on high-level waste solidification and design of the engineering prototype VERA

    Energy Technology Data Exchange (ETDEWEB)

    Guber, W; Diefenbacher, W; Hild, W; Krause, H; Schneider, E; Schubert, G

    1972-11-01

    In the present paper the solidification process for highly active waste solutions as developed in the Karlsruhe Nuclear Research Center is presented. Its principal steps are: denitration, calcination in a spray calciner operated with superheated steam, melting of the calcine with appropriate additives to borosilicate glass in an induction-heated melting furnace. The operational experiences gained so far in the inactive 1:1 pilot plant are reported. Furthermore, a description is given of the projected multi-purpose experimental facility VERA 2 which is provided for processing the highly active waste solutions from the first German reprocessing plant WAK.

  5. NEREDA Pilot Studies 2003 - 2010; NEREDA Pilotonderzoeken 2003 - 2010

    Energy Technology Data Exchange (ETDEWEB)

    Berkhof, D.; De Bruin, B.; Kerstholt, M.; Kraan, R.; Miska, V.; Peeters, T.; Van der Roest, H.; Verschoor, J. [DHV, Amersfoort (Netherlands); De Kreuk, M.; Van Loosdrecht, M. [Technische Universiteit Delft TUD, Delft (Netherlands)

    2010-10-15

    Since the nineties of last century research has been conducted on the development of the aerobic granular sludge technology for wastewater treatment. A first STOWA pilot research project was executed at Ede, Netherlands. In 2005 a technological breakthrough was accomplished and was the starting sign for a broader national development program (NNOP). Next to STOWA, Delft University of Delft and DHV, six Waterboards are involved within this development program. Main goal of the NNOP is to develop a new competitive biological wastewater treatment technology (Nereda). After the Ede project additional pilot research projects were conducted at four locations in the Netherlands. Within these pilot research projects the following aspects were investigated: granulation on different wastewater types; stability of granular sludge; optimization of nitrogen and phosphate removal, especially during winter time; control of effluent suspended solids concentration; and obtain technological design parameters for full scale WWTPs (waste water treatment plants) [Dutch] In dit rapport staan de resultaten beschreven van de tussen 2003 en 2010 uitgevoerde pilots met de aeroob-korrelslibtechnologie Nereda. Dit is een nieuwe zuiveringstechnologie waarbij het reinigende actief slib geen vlokken maar korrels vormt. Hierdoor bezinkt het slib sneller en makkelijker. De technologie wordt gekenmerkt door hoge zuiveringsrendementen, weinig ruimtebeslag (voor bezinking) en relatief lage energiekosten. De resultaten van de pilots zijn dermate goed, dat drie van de vijf deelnemende waterschappen hebben besloten om 1 van hun rwzi's (rioolwaterzuiveringsinstallaties) aan te passen op basis van de Nereda-technologie.

  6. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Reedlunn, Benjamin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  7. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Reedlunn, Benjamin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-09-27

    Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  8. A pilot plant for solar-cell manufacture; Ligne pilote de fabrication de cellules solaires

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, D.; Ziegler, Y.; Closset, A. [VHF - Technologies SA, Yverdon-les-Bains (Switzerland)

    2005-07-01

    A pilot plant for the manufacture of amorphous silicon solar cells on plastic film substrate was built allowing the annual production of 40 kW peak power. The production steps comprise: a) the continuous coating of n-i-p solar cells by VHF-PECVD with a capacity of 28.5 meters in 8.5 hours; b) transparent-conducting-oxide (TCO) top contact structuring using a continuous process; c) series connection step (scribing and Ag-paste) with a capacity of 28 meters in 6 hours; d) back and top contact sputtering with 3 parallel magnetrons; e) integration of a large-area vacuum laminator enabling the simultaneous lamination of 4 products of 4 Wp. In parallel with this project, a complete cost model was established enabling a more quantitative approach of the future technological and industrial strategy of the company. An increase of the capacity to 100 kWp has been planned for summer 2005.

  9. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter

  10. DSM energy saving pilot project report. Furniture Plant Teika, Riga, Latvia

    International Nuclear Information System (INIS)

    Ananevski, V.; Kalejs, M.; Hercogs, J.; Blumbergs, U.

    1995-07-01

    The purpose of this pilot project was to carry out energy audit into the furniture plant TEIKA and energy saving measures. Another aim was to transfer the Danish know how and experience obtained through the Danish effort in Latvian industries consumers. Therefore great attention is paid to energy mapping in order to show possibilities of the Danish methodisms. This report is a part of the Joint Latvian - Danish Project Demand Side Management and Energy Saving. It is a results of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and on the other hand a Danish team, which was represented by the Danish Power Consult company NESA. (EG)

  11. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 2, Supporting Data

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2007-03-25

    This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2006. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

  12. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 2, Supporting Data

    International Nuclear Information System (INIS)

    2007-01-01

    This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2006. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

  13. Pilot Plant for Food Irradiation in The Netherlands; Usine Pilote pour l'Irradiation de Denrees Alimentaires aux Pays-Bas; Opytnaya ustanovka po oblucheniyu pishchevykh produktov v Gollandii; Planta Piloto de Irradiacion de Alimentos en los Paises Bajos

    Energy Technology Data Exchange (ETDEWEB)

    De Zeeuw, D.; Van Kooy, J. G. [Association EURATOM-ITAL, Wageningen (Netherlands)

    1966-11-15

    The main problem raised by pilot- plant investigations is to devise a method for bridging the gap between developmental work in the laboratory and the practical applications of this work. How can the knowledge acquired in the laboratory be passed on to manufacturers or processors? The following questions are pertinent: (a) Is the pilot plant regarded as an immediate precursor of commercial plants? (b) How is a 100-fold increase in product handling realized? (c) How is commercial interest increased? (d) Who carries the final responsibilities for the programme of the pilot plant? (e) What technical facilities are needed, and (f) How the pilot plant should be organized to keep a constant flow of information between interested parties. All these aspects are discussed on the basis of a planned pilot plant for food irradiation in the Netherlands. (author) [French] Le principal probleme que pose l'etude d'une installation pilote consiste a franchir le pas entre les travaux en laboratoire et leur application pratique. En d'autres termes, comment les connaissances acquises en laboratoire peuvent-elles etre transmises aux constructeurs ou aux utilisateurs? Les questions suivantes se posent: a) L'installation pilote est-elle consideree comme le precurseur immediat d'une version commerciale? b) comment peut-on multiplier sa capacite par 100? c) Comment peut-on la rendre commercialement plus interessante? d) Qui est responsable en dernier ressort du programme de l'installation pilote? e) Quels sont les moyens techniques necessaires? f) Comment organiser l'installation pilote pour assurer un echange constant de renseignements entre les parties interessees? Tous les points mentionnes ci-dessus sont etudies en partant des donnees relatives a une installation pilote d'irradiation dont la construction est envisagee aux Pays-Bas. (author) [Spanish] El problema principal que plantea el estudio de las plantas piloto es idear un metodo que sirva de nexo entre los trabajos de

  14. Effect of a plant sterol, fish oil and B vitamin combination on cardiovascular risk factors in hypercholesterolemic children and adolescents: a pilot study

    Directory of Open Access Journals (Sweden)

    Garaiova Iveta

    2013-01-01

    Full Text Available Abstract Background Assessment of cardiovascular disease (CVD risk factors can predict clinical manifestations of atherosclerosis in adulthood. In this pilot study with hypercholesterolemic children and adolescents, we investigated the effects of a combination of plant sterols, fish oil and B vitamins on the levels of four independent risk factors for CVD; LDL-cholesterol, triacylglycerols, C-reactive protein and homocysteine. Methods Twenty five participants (mean age 16 y, BMI 23 kg/m2 received daily for a period of 16 weeks an emulsified preparation comprising plant sterols esters (1300 mg, fish oil (providing 1000 mg eicosapentaenoic acid (EPA plus docosahexaenoic acid (DHA and vitamins B12 (50 μg, B6 (2.5 mg, folic acid (800 μg and coenzyme Q10 (3 mg. Atherogenic and inflammatory risk factors, plasma lipophilic vitamins, provitamins and fatty acids were measured at baseline, week 8 and 16. Results The serum total cholesterol, LDL- cholesterol, VLDL-cholesterol, subfractions LDL-2, IDL-1, IDL-2 and plasma homocysteine levels were significantly reduced at the end of the intervention period (pp Conclusions Daily intake of a combination of plant sterols, fish oil and B vitamins may modulate the lipid profile of hypercholesterolemic children and adolescents. Trial registration Current Controlled Trials ISRCTN89549017

  15. Feasibility study for adapting ITREC plant to reprocessing LMFBR fuels

    International Nuclear Information System (INIS)

    Moccia, A.; Rolandi, G.

    1976-05-01

    The report evaluates the feasibility of adapting ITREC plant to the reprocessing LMFBR fuels, with the double purpose of: 1) recovering valuable Pu contained in these fuels and recycling it to the fabrication plant; 2) trying, on a pilot scale, the chemical process technology to be applied in a future industrial plant for reprocessing the fuel elements discharged from fast breeder power reactors

  16. A historical review of Waste Isolation Pilot Plant backfill development

    International Nuclear Information System (INIS)

    Krumhansl, James L.; Molecke, Martin A.; Papenguth, Hans W.; Brush, Laurence H.

    2000-01-01

    Backfills have been part of Sandia National Laboratories' [Sandia's] Waste Isolation Pilot Plant [WIPP] designs for over twenty years. Historically, backfill research at Sandia has depended heavily on the changing mission of the WIPP facility. Early testing considered heat producing, high level, wastes. Bentonite/sand/salt mixtures were evaluated and studies focused on developing materials that would retard brine ingress, sorb radionuclides, and withstand elevated temperatures. The present-day backfill consists of pure MgO [magnesium oxide] in a pelletized form and is directed at treating the relatively low contamination level, non-heat producing, wastes actually being disposed of in the WIPP. Its introduction was motivated by the need to scavenging CO 2 [carbon dioxide] from decaying organic components in the waste. However, other benefits, such as a substantial desiccating capacity, are also being evaluated. The MgO backfill also fulfills a statutory requirement for assurance measures beyond those needed to demonstrate compliance with the US Environmental Protection Agency [EPA] regulatory release limits. However, even without a backfill, the WIPP repository design still operates within EPA regulatory release limits

  17. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and the FY 1989 results were summarized. As to the gasifier equipment, fabrication of a considerable number of the main equipment was finished. And, the equipment was sent into the coal gasification power plant and the installation work was done. Concerning gas refining facilities, fabrication of most of the components of the dry desulfurization system was finished, and further, fabrication of part of the piping prefabrication, disk and part of the disk fitting instrument was finished. The partial equipment of the dry dust removal system was also fabricated. About gas turbine facilities, the drawings necessary for each of the equipment fabricated/installed in this fiscal year were made, and at the same time a part of the technical data prepared so far was reviewed according to the progress of design. As to safety environmental facilities, installation work was done of gas treatment furnace, gas cooling system, buffer tank, desulfurizing tower, etc. Besides, design/technical study were made of the total control system, equipment of the indoor switching station, etc. (NEDO)

  18. Partial degradation of five pesticides and an industrial pollutant by ozonation in a pilot-plant scale reactor

    International Nuclear Information System (INIS)

    Maldonado, M.I.; Malato, S.; Perez-Estrada, L.A.; Gernjak, W.; Oller, I.; Domenech, Xavier; Peral, Jose

    2006-01-01

    Aqueous solutions of a mixture of several pesticides (alachlor, atrazine, chlorfenvinphos, diuron and isoproturon), considered PS (priority substances) by the European Commission, and an intermediate product of the pharmaceutical industry (α-methylphenylglycine, MPG) chosen as a model industrial pollutant, have been degraded at pilot-plant scale using ozonation. This study is part of a large research project [CADOX Project, A Coupled Advanced Oxidation-Biological Process for Recycling of Industrial Wastewater Containing Persistent Organic Contaminants, Contract No.: EVK1-CT-2002-00122, European Commission, http://www.psa.es/webeng/projects/cadox/index.html[1

  19. Partial degradation of five pesticides and an industrial pollutant by ozonation in a pilot-plant scale reactor

    Energy Technology Data Exchange (ETDEWEB)

    Maldonado, M.I. [PSA - Plataforma Solar de Almeria, CIEMAT, Crta Senes km 4, Tabernas, Almeria 04200 (Spain); Malato, S. [PSA - Plataforma Solar de Almeria, CIEMAT, Crta Senes km 4, Tabernas, Almeria 04200 (Spain); Perez-Estrada, L.A. [PSA - Plataforma Solar de Almeria, CIEMAT, Crta Senes km 4, Tabernas, Almeria 04200 (Spain); Gernjak, W. [PSA -Plataforma Solar de Almeria, CIEMAT, Crta Senes km 4, Tabernas, Almeria 04200 (Spain); Oller, I. [PSA - Plataforma Solar de Almeria, CIEMAT, Crta Senes km 4, Tabernas, Almeria 04200 (Spain); Domenech, Xavier [Departament de Quimica, Edifici Cn, Universitat Autonoma de Barcelona, E-08193 Bellaterra, Barcelona (Spain); Peral, Jose [Departament de Quimica, Edifici Cn, Universitat Autonoma de Barcelona, E-08193 Bellaterra, Barcelona (Spain)]. E-mail: jose.peral@uab.es

    2006-11-16

    Aqueous solutions of a mixture of several pesticides (alachlor, atrazine, chlorfenvinphos, diuron and isoproturon), considered PS (priority substances) by the European Commission, and an intermediate product of the pharmaceutical industry ({alpha}-methylphenylglycine, MPG) chosen as a model industrial pollutant, have been degraded at pilot-plant scale using ozonation. This study is part of a large research project [CADOX Project, A Coupled Advanced Oxidation-Biological Process for Recycling of Industrial Wastewater Containing Persistent Organic Contaminants, Contract No.: EVK1-CT-2002-00122, European Commission, http://www.psa.es/webeng/projects/cadox/index.html[1

  20. The pilot plant in Geiselbullach for the gamma irradiation of sewage sludge - design, operation experience and cost calculations

    International Nuclear Information System (INIS)

    Lessel, T.; Hennig, E.

    1976-01-01

    The pilot plant for sewage sludge irradiation in Geiselbullach near Munich has been in operation from July '73 to October '75 with a capacity of 30 m 3 per day. Successful experiences during this period resulted in an increase of the installed radiation energy and in several improvements for the technique and the efficiency. From December 1975 on the plant has been operating with a daily capacity of 120 m 3 of sludge per day. The experience with this plant brought several problems which caused interruptions of the continuous operation and that had to be solved with new measures. But although the facility at Geiselbullach is a pilot plant the availability was more than 350 days per year. Due to the simple design of the plant and of the fully automatic operation no special trained personal is necessary for the maintenance. Beside the effect of the hygienization the irradiation caused improved sedimentation properties of the sludge. Presently investigations are undertaken to prove better mechanical sludge dewatering properties. Cost calculations resulted in about DM 2.30 for operating expenses and DM 2.25 for capital costs per m 3 of sludge for the fully charged plant. The capital costs will be less in commercial plants. The conditioning effect on the sludge by the irradiation means savings of about DM 1.00 per m 3 . The irradiation of sewage sludge proved to be possible at about equal costs compared to the wellknown heat treatment (pasteurization at 70 0 C during 30 minutes.). Further investigations have to be done to overcome the contrary development of the plant capacity, limited by the decaying radiation energy and the normally rising sludge quantities of a sewage water treatment plant. (author)

  1. The treatment of irradiated uranium fuel. Results obtained while operating the pilot plant at Fontenay-aux-Roses; Le traitement de l'uranium irradie. Resultats d'exploitation de l'usine-pilote de Fontenay-aux-Roses

    Energy Technology Data Exchange (ETDEWEB)

    Regnaut, P; Faugeras, P; Brut, A; Helou, R; Redon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    In this paper the results obtained from four years operation of the pilot plant when using bars of increasing activity, are summarised and compared with the results of parallel studies carried out in the laboratory. As a conclusion to the article, the optimum conditions for the different phases of a process based on solvent extraction are given. (author)Fren. [French] Cette conference resume les resultats obtenus durant quatre annees de fonctionnement de l'Usine-Pilote, avec des barreaux d'activite croissante et les compare aux resultats d'etudes conduites parallelement en laboratoire. En conclusion sont donnees les conditions optima pour les differentes phases d'un procede base sur l'extraction par solvant. (auteur)

  2. Doing A Pilot Study: Why Is It Essential?

    OpenAIRE

    Hassan, Zailinawati Abu; Schattner, Peter; Mazza, Danielle

    2006-01-01

    A pilot study is one of the essential stages in a research project. This paper aims to describe the importance of and steps involved in executing a pilot study by using an example of a descriptive study in primary care. The process of testing the feasibility of the project proposal, recruitment of subjects, research tool and data analysis was reported. We conclude that a pilot study is necessary and useful in providing the groundwork in a research project.

  3. Waste Isolation Pilot Plant (WIPP) startup plan

    International Nuclear Information System (INIS)

    1988-03-01

    To allow the Waste Isolation Pilot Plant (WIPP) to transition from a Major System Acquisition to an operating demonstration facility, the Acquisition Executive and the Energy System Acquisition Advisory Board (ESAAB) must concur in the facility's readiness to receive waste. This action, designated in DOE Order 4700.1 as Key Decision Four, concludes with the Chairman of the ESAAB issuing a Record of Decision. Since the meeting leading to the Record of Decision is scheduled for August 1988, plans must be made to ensure all activities contributing to that decision are completed in a clear and well-coordinated process. To support that effort, this Start-Up Plan was prepared to identify and track key events necessary to verify WIPP's readiness to receive waste; this provides a management/scheduling/tracking tool for the DOE WIPP Project Office (WPO) and a tracking mechanism for the DOE Albuquerque Operations Office (DOE-AL) and for DOE Headquarters (DOE-HQ); and describe the process to ensure readiness is documented by providing relevant data and reports to the cognizant decision makers. The methods by which these two purposes are achieved are discussed in further detail in the remainder of this plan

  4. Waste Isolation Pilot Plant safety analysis report

    International Nuclear Information System (INIS)

    1997-03-01

    The United States Department of Energy (DOE) was authorized by Public Law 96-164 to provide a research and development facility for demonstrating the safe permanent disposal of transuranic (TRU) wastes from national defense activities and programs of the United States exempted from regulations by the US Nuclear Regulatory Commission (NRC). The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico near Carlsbad, was constructed to determine the efficacy of an underground repository for disposal of TRU wastes. In accordance with the 1981 and 1990 Records of Decision (ROD), the development of the WIPP was to proceed with a phased approach. Development of the WIPP began with a siting phase, during which several sites were evaluated and the present site selected based on extensive geotechnical research, supplemented by testing. The site and preliminary design validation phase (SPDV) followed the siting phase, during which two shafts were constructed, an underground testing area was excavated, and various geologic, hydrologic, and other geotechnical features were investigated. The construction phase followed the SPDV phase during which surface structures for receiving waste were built and underground excavations were completed for waste emplacement

  5. Experimental investigation of the chemical looping method on a 1 MW pilot plant; Experimentelle Untersuchung des Chemical Looping Verfahrens an einer 1 MW Versuchsanlage

    Energy Technology Data Exchange (ETDEWEB)

    Orth, Matthias

    2014-08-27

    Attempting to counteract the consequences of climate change, leading industrial nations have agreed on reducing their CO{sub 2} emissions significantly. To reach these reduction goals, it is essential to reduce the CO{sub 2} emissions in the field of energy conversion. This PHD thesis covers the field of chemical looping combustion, a technology that uses fossil fuels for energy conversion with inherent capture of CO{sub 2}. Since the research regarding chemical looping had so far focused mainly on lab scale or small scale experiments, a 1 MW pilot plant has been erected at Technische Universitaet Darmstadt in order to investigate the process in a semi-industrial scale and to check the process efficiency with commercially usable equipment. This pilot consists of two interconnected fluidized bed reactors and has an overall height of more than 11 m. In this thesis, some experiments with ilmenite - used as the oxygen carrier - are explained. Furthermore, the design, erection and commissioning of the pilot plant are presented as well as the results of the first test campaigns. The evaluation of the latter proves that the process can be handled in the design configuration and that CO{sub 2} can be safely captured in a pilot plant of this scale.

  6. A pilot plant demonstration of the vitrification of radioactive solutions using microwave power

    International Nuclear Information System (INIS)

    Morrell, M.S.; Hardwick, W.H.; Murphy, V.; Wace, P.F.

    1986-01-01

    A process has been developed that exploits the characteristics of microwave heating for the vitrification of high-level radioactive liquid waste. This process, microwave vitrification, has been successfully operated at pilot plant scale in an active cell using simulated liquid waste containing several curies of radioactivity. Excellent decontamination factors have been achieved for both volatiles and nonvolatiles with an average ruthenium decontamination factor of 490 and a gross alpha emitter decontamination factor of 100,000. Almost all the radioactivity is incorporated in a glass block

  7. Achievement report for fiscal 1993 on developing entrained bed coal gasification power plant. Part 4. Pilot plant operation edition; 1993 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Tests and researches have been carried out on operation of a 200-t/d entrained bed coal gasification pilot plant built with an objective of establishing the coal gasification composite power generation technology. This paper summarizes the operation achievements in fiscal 1993. The plant operation record in fiscal 1993 was as follows: 430 hours 27 minutes in the gasification furnace (ten gasification operations), 233 hours 51 minutes in the gas refining facility, 140 hours 31 minutes in the gas turbine facility (power generation amount of 746.8 MWh with nine actuations), 1,263 hours 09 minutes in the processing furnace in the safety environment facility, and 427 hours 22 minutes in the NOx removal equipment. Descriptions were given with detailed graphs on the actuation and shutdown record with respect to the run D2, the run D3 (1 and 2), the run D4, the run D5, the run D6, and the run D7 (1 through 4). The operation procedures were prepared for the plant startup and shutdown schedule, the generalization report, the gasification furnace facility, the gas refining facility (dry type desulfurizing facility), the gas refining facility (dry type dust removing facility), the gas turbine facility, the combustor testing facility with actual pressure and size, and the safety environment facilities. (NEDO)

  8. Textile wastewater treatment and reuse by solar catalysis: results from a pilot plant in Tunisia.

    Science.gov (United States)

    Bousselmi, L; Geissen, S U; Schroeder, H

    2004-01-01

    Based on results from bench-scale flow-film-reactors (FFR) and aerated cascade photoreactors, a solar catalytic pilot plant has been built at the site of a textile factory. This plant has an illuminated surface area of 50 m2 and is designed for the treatment of 1 m3 h(-1) of wastewater. The preliminary results are presented and compared with a bench-scale FFR using textile wastewater and dichloroacetic acid. Equivalent degradation kinetics were obtained and it was demonstrated that the solar catalytic technology is able to remove recalcitrant compounds and color. However, on-site optimization is still necessary for wastewater reuse and for an economic application.

  9. Waste Isolation Pilot Plant Strategic Plan

    International Nuclear Information System (INIS)

    1993-03-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Strategic Plan is to provide decision makers, project participants, and the public with a high-level overview of the objectives, issues, and strategiesthat impact a decision on the suitability of WIPP as a permanent, safe disposal facility for transuranic (TRU) waste that has resulted from defense activities. This document is a component of an integrated planning process and is a key management tool that is coordinated and consistent with the Secretary's Disposal Decision Plan and the Environmental Restoration and Waste Management (EM) Five-Year Plan. This documentsupports other US Department of Energy (DOE) planning efforts, including the TRU Waste Program. The WIPP Strategic Plan addresses the WIPP Program Test Phase, Disposal Decision, Disposal Phase, and Decommissioning Phase (decontamination and decommissioning). It describes the actions and activities that the DOE will conduct to ensure that WIPP will comply with applicable, relevant, and appropriate requirements of the US Environmental Protection Agency (EPA), State of New Mexico, and other applicable federal and state regulations. It also includes the key assumptions under which the strategy was developed. A comprehensive discussion of the multitude of activities involved in the WIPP Program cannot be adequately presented in this document. The specific details of these activities are presented in other, more detailed WIPP planningdocuments

  10. Waste Isolation Pilot Plant borehole data

    International Nuclear Information System (INIS)

    1995-04-01

    Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrological testing and resource evaluation exist in numerous source documents. This project was initiated to develop a comprehensive data base that would include the data on all WIPP related surface boreholes from the Atomic Energy Commission, Waste Isolation Pilot Plant Energy Research and Development Administration, Department of Energy, and Hydrologic Test Borehole Programs. The data compiled from each borehole includes: operator, permit number, location, total depth, type of well, driller, drilling record, casing record, plugging schedule, and stratigraphic summary. There are six groups of boreholes contained in this data base, they are as follows: Commercially Drilled Potash Boreholes, Energy Department Wells, Geologic Exploration Boreholes, Hydrologic Test Boreholes, Potash Boreholes, and Subsurface Exploration Boreholes. There were numerous references which contained borehole data. In some cases the data found in one document was inconsistent with data in another document. In order to ensure consistency and accuracy in the data base, the same references were used for as many of the boreholes as possible. For example, all elevations and locations were taken from Compilation and Comparison of Test-Hole Location Surveys in the Vicinity of the WIPP Site. SAND 88-1065, Table 3-5. There are some sections where a data field is left blank. In this case, the information was either not applicable or was unavailable

  11. Waste Isolation Pilot Plant borehole data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrological testing and resource evaluation exist in numerous source documents. This project was initiated to develop a comprehensive data base that would include the data on all WIPP related surface boreholes from the Atomic Energy Commission, Waste Isolation Pilot Plant Energy Research and Development Administration, Department of Energy, and Hydrologic Test Borehole Programs. The data compiled from each borehole includes: operator, permit number, location, total depth, type of well, driller, drilling record, casing record, plugging schedule, and stratigraphic summary. There are six groups of boreholes contained in this data base, they are as follows: Commercially Drilled Potash Boreholes, Energy Department Wells, Geologic Exploration Boreholes, Hydrologic Test Boreholes, Potash Boreholes, and Subsurface Exploration Boreholes. There were numerous references which contained borehole data. In some cases the data found in one document was inconsistent with data in another document. In order to ensure consistency and accuracy in the data base, the same references were used for as many of the boreholes as possible. For example, all elevations and locations were taken from Compilation and Comparison of Test-Hole Location Surveys in the Vicinity of the WIPP Site. SAND 88-1065, Table 3-5. There are some sections where a data field is left blank. In this case, the information was either not applicable or was unavailable.

  12. Summary of scientific investigations for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Weart, W.D.

    1996-01-01

    The scientific issues concerning disposal of radioactive wastes in salt formations have received 40 years of attention since the National Academy of Sciences (NAS) first addressed this issue in the mid-50s. For the last 21 years, Sandia National Laboratories (SNL) have directed site specific studies for the Waste Isolation Pilot Plant (WIPP). This paper will focus primarily on the WIPP scientific studies now in their concluding stages, the major scientific controversies regarding the site, and some of the surprises encountered during the course of these scientific investigations. The WIPP project's present understanding of the scientific processes involved continues to support the site as a satisfactory, safe location for the disposal of defense-related transuranic waste and one which will be shown to be in compliance with Environmental Protection Agency (EPA) standards. Compliance will be evaluated by incorporating data from these experiments into Performance Assessment (PA) models developed to describe the physical and chemical processes that could occur at the WIPP during the next 10,000 years under a variety of scenarios. The resulting compliance document is scheduled to be presented to the EPA in October 1996 and all relevant information from scientific studies will be included in this application and the supporting analyses. Studies supporting this compliance application conclude the major period of scientific investigation for the WIPP. Further studies will be of a ''confirmatory'' and monitoring nature

  13. DOING A PILOT STUDY: WHY IS IT ESSENTIAL?

    Directory of Open Access Journals (Sweden)

    Zailinawati Abu Hassan

    2006-01-01

    Full Text Available A pilot study is one of the essential stages in a research project. This paper aims to describe the importance of and steps involved in executing a pilot study by using an example of a descriptive study in primary care. The process of testing the feasibility of the project proposal, recruitment of subjects, research tool and data analysis was reported. We conclude that a pilot study is necessary and useful in providing the groundwork in a research project.

  14. Prevention of refinery tower plugging by residual oil gellant chemicals in crude : pilot plant evaluation of alternative oil gellants

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.S.; Fyten, G.C.; Tamayo, C.; Funkhouser, G.P. [Haliburton, Houston, TX (United States); Lemieux, A.; Blackmore, T. [Omnicon Consultants Inc., Calgary, AB (Canada)

    2007-07-01

    Previous studies have described refinery plugging caused by volatile phosphorus components originating from phosphate ester oil gellants as well as two successful field trials of new phosphonate ester oil gellants, which were demonstrated to address this problem. Additional field testing of phosphonate ester gellants directed at optimization of cost and performance has also been previously studied. This paper presented the results of a follow-up study to these previous investigations, as new modified phosphate ester systems were expected to become commercial that would reduce volatile phosphorus. Several questions that required further investigation were discussed in this paper. These included the comparative ability of phosphonate and modified phosphate esters to control volatile phosphorus; tower fouling at higher temperatures in the presence of steam; and, organic halide formations under distillation tower conditions. The paper presented the results of full-scale pilot plant testing that was performed over several days with flowback captured after actual fracturing treatments in order to serve as a guide to the selection of oil gellant systems for reduction of refinery tower and heat exchanger fouling. The study measured fouling of a tray inserted in the pilot plant distillation tower as well as fouling of the packing material. Any changes in operating parameters such as rate, temperature, or pressure over the time of each test were also noted, as these could also be indicative of fouling. 3 refs., 2 tabs., 17 figs.

  15. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Data 4. Development of coal liquefaction technology/Development of solvent extraction liquefaction technology/Development of brown coal solvent extraction plant (Development of 50t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (Shiryo 4). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Research is conducted for the development of a liquefaction plant (50t/d pilot plant) for Australia's Victorian brown coal. In fiscal 1981, using the process concept and design data obtained through the study of elements, a detailed design of a primary hydrogenation system is drawn, part of the equipment is procured, and on-site construction work is started. The book is a collection of materials which include instrumentation-related drawings covering an instrumentation loop sketch, instrument inspection specifications (flow meter, level gage, pressure gage, thermometer, regulation meter, analyzing meter, signal receiving meter, and instrument board), general specifications for electrical instrumentation facilities, etc. (NEDO)

  16. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Data 4. Development of coal liquefaction technology/Development of solvent extraction liquefaction technology/Development of brown coal solvent extraction plant (Development of 50t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (Shiryo 4). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Research is conducted for the development of a liquefaction plant (50t/d pilot plant) for Australia's Victorian brown coal. In fiscal 1981, using the process concept and design data obtained through the study of elements, a detailed design of a primary hydrogenation system is drawn, part of the equipment is procured, and on-site construction work is started. The book is a collection of materials which include instrumentation-related drawings covering an instrumentation loop sketch, instrument inspection specifications (flow meter, level gage, pressure gage, thermometer, regulation meter, analyzing meter, signal receiving meter, and instrument board), general specifications for electrical instrumentation facilities, etc. (NEDO)

  17. The pilot plant experiment of electron beam irradiation process for removal of NOx and SOx from sinter plant exhaust gas in the iron and steel industry

    International Nuclear Information System (INIS)

    Kawamura, K.; Katayama, T.; Kawamura, Ke.

    1981-01-01

    Air pollution problem has become more important in the progress of industry. Nitrogen oxides (NOx, mostly NO) and sulfur oxides (SOx, mostly SO 2 ) which are contained in a sinter plant exhaust gas, are known as serious air pollutants. In such circumstances, an attempt has been made to simultaneously remove NOx and SOx from the sinter plant exhaust gas by means of a new electron beam irradiation process. The process consists of adding a small amount of NH 3 to the exhaust gas, irradiating the gas by electron beam, forming ammonium salts by reactions of NOx and SOx with the NH 3 and collecting ammonium salts by dry electrostatic precipitator (E.P.). Basic research on the present process had been performed using heavy oil combustion gas. Based on the results research was launched to study the applicability of the process to the treatment of sinter plant exhaust gas. A pilot plant, capable of treating a gas flow of 3000 Nm 3 /H was set up, and experiments were performed from July 1977 to June 1978. The plant is described and the results are presented. (author)

  18. Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008

    International Nuclear Information System (INIS)

    2009-01-01

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first

  19. Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Enviromnetal Services

    2009-09-21

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first

  20. Distillation Parameters for Pilot Plant Production of Laurus nobilis Essential oil

    Directory of Open Access Journals (Sweden)

    Temel Özek

    2012-01-01

    Full Text Available Essential oils have increasing importance in flavour and fragrance industries. They are obtained by distillation techniques. In order to produce an oil with market potential its optimum production parameters have to be well known prior to its commercial production. Determination of the steam distillation parameters of commercially available Laurel leaves oil in pilot plant scale is described. The effect of steam rate and processing time play a major role in distillation of essential oils. Distillation speed was high in the beginning of the process, then gradually reduced as the distillation proceeded. The main component of the oil of Laurel leaf oil was 1,8-cineole accumulating significantly in the early fractions.

  1. Hydraulic testing of Salado Formation evaporites at the Waste Isolation Pilot Plant site: Second interpretive report

    Energy Technology Data Exchange (ETDEWEB)

    Beauheim, R.L. [Sandia National Labs., Albuquerque, NM (United States); Roberts, R.M.; Dale, T.F.; Fort, M.D.; Stensrud, W.A. [INTERA, Inc., Austin, TX (United States)

    1993-12-01

    Pressure-pulse, constant-pressure flow, and pressure-buildup tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Transmissivities have been interpreted from six sequences of tests conducted on five stratigraphic intervals within 15 m of the WIPP underground excavations.

  2. Hydraulic testing of Salado Formation evaporites at the Waste Isolation Pilot Plant site: Second interpretive report

    International Nuclear Information System (INIS)

    Beauheim, R.L.; Roberts, R.M.; Dale, T.F.; Fort, M.D.; Stensrud, W.A.

    1993-12-01

    Pressure-pulse, constant-pressure flow, and pressure-buildup tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Transmissivities have been interpreted from six sequences of tests conducted on five stratigraphic intervals within 15 m of the WIPP underground excavations

  3. Offgas system particulate cleaning test and evaluation for the process experimental pilot plant

    International Nuclear Information System (INIS)

    Ayers, A.L. Jr.; Gale, L.G.; Stermer, D.L.

    1990-01-01

    The process experimental pilot plant (PREPP) incinerates mixed solid waste. The exhaust gas is processed through a wet offgas cleaning system. Rapid loading of the exhaust filters has been a problem and an important contributing factor is the use of quench solution containing a relatively high concentration of dissolved solids. The dissolved solids are released as a submicron particulate when the quench solution evaporates. A series of tests were performed to better identify the nature of the problem and explore solutions to the problem involving modifications to the quench process

  4. Offgas system particulate cleaning test and evaluation for the Process Experimental Pilot Plant

    International Nuclear Information System (INIS)

    Ayers, A.L. Jr.; Gale, L.G.; Stermer, D.L.

    1990-01-01

    The Process Experimental Pilot Plant (PREPP) incinerates mixed solid waste. The exhaust gas is processed through a wet offgas cleaning system. Rapid loading of the exhaust filters has been a problem and an important contributing factor is the use of a quench solution containing a relatively high concentration of dissolved solids. The dissolved solids are released as a submicron particulate when the quench solution evaporates. A series of tests were performed to better identify the nature of the problem and explore solutions to the problem involving modifications to the quench process. 2 refs., 7 figs

  5. FY 1996 report on the results of the development of an entrained bed coal gasification power plant. Part 2. Investigational study of verification plant; 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Jissho plant ni kansuru chosa kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    For the purpose of developing the technology of the integrated coal gasification combined cycle power generation, an investigational study of verification plant was made, and the FY 1996 results were summarized. In this fiscal year, the conceptual design was made of the Nakoso method based on the method of Nakoso pilot plant, the fixed bed method in which fixed bed gas refining facilities tested in Nakoso pilot plant were adopted, and the packed bed method. In the Nakoso method, 5 cases were studied using the air blown two-stage entrained bed for gasifier, dry two-stage fluidized bed for desulfurization and dry granular bed packed bed for dust removal. In the fixed bed method, 2 cases were studied using the air blown two-stage entrained bed for gasifier and dry fixed bed for gas refining. In the packed bed method, 2 cases were studied using the air blown two-stage entrained bed for gasifier and dry packed bed for gas refining. As to gas turbine facilities, 5 cases were studied in which GT output is 115MW - 215MW (output of combined cycle power generation: 220MW - 420MW). (NEDO)

  6. Pre-Study Walkthrough with a Commercial Pilot for a Preliminary Single Pilot Operations Experiment

    Science.gov (United States)

    O'Connor-Dreher, Ryan; Roberts, Z.; Ziccardi, J.; Vu, K-P. L.; Strybel, T.; Koteskey, Robert William; Lachter, Joel B.; Vi Dao, Quang; Johnson, Walter W.; Battiste, V.

    2013-01-01

    The number of crew members in commercial flights has decreased to two members, down from the five-member crew required 50 years ago. One question of interest is whether the crew should be reduced to one pilot. In order to determine the critical factors involved in safely transitioning to a single pilot, research must examine whether any performance deficits arise with the loss of a crew member. With a concrete understanding of the cognitive and behavioral role of a co-pilot, aeronautical technologies and procedures can be developed that make up for the removal of the second aircrew member. The current project describes a pre-study walkthrough process that can be used to help in the development of scenarios for testing future concepts and technologies for single pilot operations. Qualitative information regarding the tasks performed by the pilots can be extracted with this technique and adapted for future investigations of single pilot operations.

  7. The ENIQ pilot study: current status

    Energy Technology Data Exchange (ETDEWEB)

    Lemaitre, P; Eriksen, B; Crutzen, S [European Commission, DG Joint Research Centre, Petten (Netherlands); Hansch, M [Preussische Elektrizitaets-AG (Preussenelektra), Hannover (Germany); Whittle, J [AEA Technology, Warrington (United Kingdom)

    1998-11-01

    A pilot study is currently being carried out by ENIQ (European Network for Inspection Qualification) in order to explore the issues involved in inspection qualification applied along the general principles of the European methodology. The components selected for the pilot study are austenitic pipe to pipe and pipe to elbows welds typical of those in BWR recirculation loops. A range of defect parameters has been defined. A suitable inspection procedure designed to find the designated defects will be applied to geometrically representative test pieces. The procedure/equipment will be qualified through open trials and technical justification. The personnel qualification will be done in a blind way. Once all features of the inspection system will have been qualified an in-service inspection will be simulated in order to test the feasibility of the qualification approach followed. In this paper the current status of this pilot study is discussed. (orig.)

  8. The introduction of mobile plant clinics to Uganda

    DEFF Research Database (Denmark)

    Danielsen, Solveig; Mutebi, Emmanuel

    Four mobile (or community-based) plant health clinics were started in Uganda on a pilot basis in 2005 as an attempt to ensure better plant health advisory services for small-scale farmers.  This new way of delivering primary plant healthcare to farmers has attracted wider interest and the Ministry......, Makerere University and CABI. The purpose of this study was to gather results and lessons learned from the pilot period to inform future plant clinic interventions. The study covers issues of organisation and management, clinic operation and performance as well as clinic use and preliminary evidence...

  9. Establishment of a pilot plant for pesticide formulation, union of myanmar. Technical report: Findings and recommendations (May 1992)

    Energy Technology Data Exchange (ETDEWEB)

    Bendefy, I

    1992-05-08

    The expert report on establishment of a pilot plant for pesticides formulation in Myanmar covers: (1) project background; (2) laboratory, quality control; (3) use of domestic raw materials kerosene; (4) energy supply (diesel engines); (5) bottling and packaging; (6) transport and telecommunications; (7) industrial safety; and (8) management.

  10. Studies on the hydroprocessing of deashed oil. 9. ; Characterization of the used catalyst in the pilot plant. Deashed oil no suisoka bunkai hanno ni kansuru kenkyu. 9. ; Pilot plant shiyozumi shokubai no characterization

    Energy Technology Data Exchange (ETDEWEB)

    Kaneko, T.; Hijiriyama, M. (Mitsubishi Kasei Co., Tokyo (Japan)); Kageyama, Y. (Nippon Brown Coal Liquefaction Co. Ltd., Tokyo (Japan))

    1990-11-29

    The secondary hydroprocessing process in the two-stage hydrogenating liquefaction equipment under development at Nippon Brown Coal Liquefaction Company uses a fixed bed system. To elucidate causes of catalyst activity degradation related therewith, catalyst used for about 1000 hours in a S -t/d pilot plant was collected to investigate deposition behavior of cokes and ashed metals and changes in catalyst properties. The catalyst is made of Ca-Ni-Mo/Al2O3, which was recovered from baskets placed in each layer in a reactor, washed in a predetermined manner, dried, and analyzed. In addition, in order to investigate remaining activity, 1-methylnaphthalene was hydrogenated, and deashed oil (DAO) was hydrocracked. The result may be summarized as follows: The major cause for the catalyst activity degradation is deposition of carbonaceous materials and ashed metals on the catalyst; and especially alkali metals (Na and K) were considered to be the major cause for the catalyst deactivation with time. 2 refs., 8 figs.

  11. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    International Nuclear Information System (INIS)

    1995-01-01

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals

  12. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

  13. Update on the EPRI power generation risk-based inservice inspection pilot plant studies

    International Nuclear Information System (INIS)

    Gosselin, S.R.

    1997-01-01

    The scope for ASME Section XI ISI programs is largely based on deterministic results contained in design stress reports. These reports are normally very conservative and may not be an accurate representation of failure potential. Service experience has shown that failures are due to either corrosion or fatigue and typically occur in areas not included in the plant's ISI program. Consequently, nuclear plants are devoting significant resources to inspection programs that provide minimum benefit. As an alternative, significant industry attention has been devoted to the application of risked-based selection criteria in order to determine the scope of inservice inspection (ISI) programs at nuclear power plants. Preliminary EPRI studies indicate that the application of these techniques will allow operating nuclear plants to reduce the examination scope of current ISI programs by as much as 60 to 80%, significantly reduce costs, and continue to maintain high nuclear plant safety standards

  14. Overview of the Quality Assurance Program Applied to the Performance Assessment of the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Pickering, S.Y.

    1999-01-01

    The Waste Isolation Pilot Plant (WIPP) is the first deep geologic repository for radioactive waste disposal in the world to be certified by a regulator. Rigorous, nuclear-industry quality assurance (QA) requirements were imposed by the US Environmental Protection Agency. As the Scientific Advisor to the US Department of Energy, Sandia National Laboratories applied these standards to the experimental studies and performance assessment used in the certification process. The QA program ensured that activities conducted by SNL were traceable, transparent, reviewed, reproducible, and retrievable. As a result, regulators and stakeholders were able to evaluate and ultimately certify and accept the WIPP

  15. Creep tests on clean and argillaceous salt from the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Mellegard, K.D.; Pfeifle, T.W.

    1993-05-01

    Fifteen triaxial compression creep tests were performed on clean and argillaceous salt from the Waste Isolation Pilot Plant (WIPP). The temperatures in the tests were either 25 degrees C or 100 degrees C while the stress difference ranged from 3.5 MPa to 21.0 MPa. In all tests, the confining pressure was 15 MPa. Test duration ranged from 23 to 613 days with an average duration of 300 days. The results of the creep tests supplemented earlier testing and were used to estimate two parameters in the Modified Munson-Dawson constitutive law for the creep behavior of salt. The two parameters determined from each test were the steady-state strain rate and the transient strain limit. These estimates were combined with parameter estimates determined from previous testing to study the dependence of both transient and steady-state creep deformation on stress difference. The exponents on stress difference determined in this study were found to be consistent with revised estimates of the exponents reported by other investigators

  16. Geohydrology of the proposed Waste Isolation Pilot Plant site in southeastern New Mexico

    International Nuclear Information System (INIS)

    Mercer, J.W.; Gonzalez, D.D.

    1981-01-01

    The proposed site for the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) is in the Los Medanos area located about 40 km east of Carlsbad, in eastern Eddy County, NM. Geohydrologic data have been collected from this area since 1972, and the data will be used as part of a study evaluating the feasibility of storing defense-associated transuranic wastes in bedded salt at a depth of 655 m. The salt beds are within the Salado Formation of Permian age. The study presented includes the determination of ground-water flow boundaries; potentiometric heads; ground-water chemistry; and hydraulic properties through pump, slug, pressure-pulse, and tracer tests. Data collected during drilling and testing 30 hydrologic holes have indicated three zones above the Salado Formation that could potentially transport wastes to the biosphere if the proposed facility is breached. These zones include the Magenta and Culebra Dolomite members of the Rustler Formation and the contact zone between the Rustler and Salado formations

  17. Socioeconomic study for the proposed waste isolation pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This document presents the historical and existing socioeconomic conditions in the vicinity of the proposed plant, projected changes in those conditions with and without the plant, and an outline of the various techniques used to make these projections. The analysis predicts impacts on the general economy in the area near the plant and on employment, personal income, population, social structure, the private economic sector, housing, land use, community services and facilities, and local government finances. Among the most important results are the following predictions: The economy of the area will derive $165 million directly and indirectly during the first 7.5 years of the project. After that, it will derive about $21 million directly and indirectly during each year of full operation. About 2100 jobs will be created directly and indirectly at the peak of the construction and about 950 jobs during the full operation. A net in-migration will occur: about 2250 people at the peak of the construction and about 1000 people during operation. A housing shortage may begin in Carlsbad in 1981 or 1982 and last for about 2 years.

  18. Socioeconomic study for the proposed waste isolation pilot plant

    International Nuclear Information System (INIS)

    1980-10-01

    This document presents the historical and existing socioeconomic conditions in the vicinity of the proposed plant, projected changes in those conditions with and without the plant, and an outline of the various techniques used to make these projections. The analysis predicts impacts on the general economy in the area near the plant and on employment, personal income, population, social structure, the private economic sector, housing, land use, community services and facilities, and local government finances. Among the most important results are the following predictions: The economy of the area will derive $165 million directly and indirectly during the first 7.5 years of the project. After that, it will derive about $21 million directly and indirectly during each year of full operation. About 2100 jobs will be created directly and indirectly at the peak of the construction and about 950 jobs during the full operation. A net in-migration will occur: about 2250 people at the peak of the construction and about 1000 people during operation. A housing shortage may begin in Carlsbad in 1981 or 1982 and last for about 2 years

  19. Results from trialling aqueous NH{sub 3} based post combustion capture in a pilot plant at Munmorah power station. Desorption

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Hai; Morgan, Scott; Allport, Andrew; Cottrell, Aaron; Do, Thong; McGregor, James; Wardhaugh, Leigh; Feron, Paul [CSIRO Energy Centre, Mayfield West, NSW (Australia)

    2013-07-01

    Australia's Commonwealth Scientific and Industrial Research Organization (CSIRO) and Delta Electricity have tested an aqueous ammonia based post combustion capture (PCC) process in a pilot plant at Munmorah black coal fired power station. This paper presents and discusses the experimental results obtained and primarily focuses on the desorption section. A high purity of CO{sub 2} product was obtained at the stripper gas outlet with the CO{sub 2} volumetric concentration generally between 99-100% and the remainder being water and NH{sub 3}. An increase in stripper pressure/temperature can lead to a decrease in NH{sub 3} concentration in the CO{sub 2} product. The NH{sub 3} concentration can be controlled within 200 ppm without wash at a stripper pressure of 850 kPa (the maximum pressure tested) at a stripper gas outlet temperatures of 20-25 C. The solid precipitation occurred in the stripper condenser and reflux lines. Due to the low ammonia content in the solution, CO{sub 2} content in the solution was low and generally more than 50% of regeneration energy was used to heat up the solvent under the pilot plant conditions. The lowest regeneration energy obtained from the pilot plant trials is 4-4.2 MJ/kg CO{sub 2} captured. The effect of various parameters including solvent flow-rate and stripper temperature/pressure in the solvent on the regeneration energy was investigated.

  20. APMP Pilot Study on Transmittance Haze

    Science.gov (United States)

    Liu, Wen-Chun; Hwang, Jisoo; Koo, Annette; Wu, Houping; Leecharoen, Rojana; Yu, Hsueh-Ling

    2018-02-01

    Five NMIs within APMP, including CMS/ITRI, MSL, NIM, NIMT and KRISS from TCPR applied to the APMP technical committee initiative project for funding to carry out a pilot comparison of transmittance haze in 2012. The project started in 2014 and the final report was completed at the end of 2016. In this pilot comparison, three different haze standards were adopted, and transmittance haze for each standard was measured according to ASTM D1003 or ISO 14782. This paper presents the first results of an APMP pilot study of transmittance haze and the analysis of the variation among different haze measurement systems which are commonly used. The study shows that the variables such as sphere multiplier, transmittance distribution, fluorescence of samples and optical path of the incident beam cause discrepancies among NMIs and highlight deficiencies in current documentary standards.

  1. Properties of salt-saturated concrete and grout after six years in situ at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Wakeley, L.D.; Harrington, P.T.; Weiss, C.A. Jr.

    1993-06-01

    Samples of concrete and grout were recovered from short boreholes in the repository floor at the Waste Isolation Pilot Plant more than six years after the concrete and grout were placed. Plugs from the Plug Test Matrix of the Plugging and Sealing Program of Sandia National Laboratories were overcored to include a shell of host rock. The cores were analyzed at the Waterways Experiment Station to assess their condition after six years of service, having potentially been exposed to those aspects of their service environment (salt, brine, fracturing, anhydrite, etc.) that could cause deterioration. Measured values of compressive strength and pulse velocity of both the grout and the concrete equaled or exceeded values from tests performed on laboratory-tested samples of the same mixtures at ages of one month to one year after casting. The phase assemblages had changed very little. Materials performed as intended and showed virtually no chemical or physical evidence of deterioration. The lowest values for strength and pulse velocity were measured for samples taken from the Disturbed Rock Zone, indicating the influence of cracking in this zone on the properties of enclosed seal materials. There was evidence of movement of brine in the system. Crystalline phases containing magnesium, potassium, sulfate, and other ions had been deposited on free surfaces in fractures and pilot holes. There was a reaction rim in the anhydrite immediately surrounding each recovered borehole plug, suggesting interaction between grout or concrete and host rock. However, the chemical changes apparent in this reaction rim were not reflected in the chemical composition of the adjacent concrete or grout. The grout and concrete studied here showed no signs of the deterioration found to have occurred in some parts of the concrete liner of the Waste Isolation Pilot Plant waste handling shaft

  2. A review of WIPP [Waste Isolation Pilot Plant] repository clays and their relationship to clays of adjacent strata

    International Nuclear Information System (INIS)

    Krumhansl, J.L.; Kimball, K.M.; Stein, C.L.

    1990-12-01

    The Salado Formation is a thick evaporite sequence located in the Permian Delaware Basin of southeastern New Mexico. This study focuses on the intense diagenetic alteration that has affected the small amounts of clay, feldspar, and quartz washed into the basin during salt deposition. These changes are of more than academic interest since this formation also houses the WIPP (Waste Isolation Pilot Plant). Site characterization concerns warrant compiling a detailed data base describing the clays in and around the facility horizon. An extensive sampling effort was undertaken to address these programmatic issues as well as to provide additional insight regarding diagenetic mechanisms in the Salado. Seventy-five samples were collected from argillaceous partings in halite at the stratigraphic level of the Waste Isolation Pilot Plant (WIPP). These were compared with twenty-eight samples from cores of the Vaca Triste member of the Salado, a thin clastic unit at the top of the McNutt potash zone, and with a clay-rich sample from the lower contact of the Culebra Dolomite (in the overlying Rustler Formation). These settings were compared to assess the influence of differences in brine chemistry (i.e., halite and potash facies, normal to hypersaline marine conditions) and sediment composition (clays, sandy silt, dolomitized limestone) on diagenetic processes. 44 refs., 11 figs., 5 tabs

  3. Conceptual structure of performance assessments conducted for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Helton, J.C.; Marietta, M.G.; Rechard, R.P.

    1993-04-01

    The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being developed by the US Department of Energy as a disposal facility for transuranic waste. In support of this project, Sandia National Laboratories is conducting an ongoing performance assessment (PA) for the WIPP. The ordered triple representation for risk proposed by Kaplan and Garrick is used to provide a clear conceptual structure for this PA. This presentation describes how the preceding representation provides a basis in the WIPP PA for (1) the definition of scenarios and the calculation of scenario probabilities and consequences, (2) the separation of subjective and stochastic uncertainties, (3) the construction of the complementary cumulative distribution functions required in comparisons with the US Environmental Protection Agency's standard for the geologic disposal of radioactive waste (i.e., 40 CFR Part 191, Subpart B), and (4) the performance of uncertainty and sensitivity studies. Results obtained in a preliminary PA for the WIPP completed in December of 1991 are used for illustration

  4. THRMS: A pilot risk management system

    International Nuclear Information System (INIS)

    Xue, D.; Xu, Y.

    2000-01-01

    Daya Bay NPP is the first commercial nuclear power plant in China. This plant is interested in and pro-active towards the development and application of PSA and PSA tools. This, together with the support from the IAEA promoted the project 'THRMS: the pilot study of risk management system for NPP'. The objectives in development and implementation of THRMS includes: survey and discuss on the development of the approaches used in constructing plant risk models; design and study on the realization of a real-time risk management system. An overview of the project is presented in this paper. (author)

  5. Design analysis of engineered alternatives for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Myers, J.; Djordjevic, S.; Adams, M.; Spangler, L.; Valdez, J.; Vetter, D.; Drez, P.

    1991-01-01

    The effectiveness of several engineered alternatives, designed to enhance the performance of the Waste Isolation Pilot Plant (WIPP), were evaluated relative to the performance of the baseline design. This evaluation was performed using a computer program referred to as the Design Analysis Model which couples salt creep closure, brine inflow, gas generation and dissipation to realistically simulate these interrelated processes over a 10,000 year period following the decommissioning of the repository. Analyses of the baseline design and nine alternative designs were performed for the undisturbed repository conditions, as well as three human intrusion events. Improvements in repository performance of up to four orders of magnitude were predicted for various engineered alternative waste forms. 6 refs., 8 figs., 1 tab

  6. Operation of a semi-technical pilot plant for nuclear aided steam gasification of coal

    International Nuclear Information System (INIS)

    Kirchhoff, R.; Heek, K.H. van; Juentgen, H.; Peters, W.

    1984-01-01

    After intensive investigations on a small scale, the principle of the process has been tested in a semi-technical pilot plant. In its gasifier a fluidized bed of approx. 1 m 2 cross-section and of up to 4 m height is operated at 40 bar. Heat is supplied to the bed from an immersed heat exchanger with helium flowing through it, which is heated electrically. The plant was commissioned in 1976 and has been in hot operation for approx. 23000 h, over 13000 h whereof account for coal gasification. Roughly 1600 t of coal have been put through. During recent years the processing of German caking long-flame gas coal and the marked improvement of the process by the use of catalysts have been demonstrated successfully. (orig.)

  7. Waste Isolation Pilot Plant Annual Site Environmental Report for 2016

    Energy Technology Data Exchange (ETDEWEB)

    Ward, Anderson [Carlsbad Field Office (CBFO), NM (United States); Basabilvazo, George T. [Carlsbad Field Office (CBFO), NM (United States)

    2017-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2016 (ASER) is to provide the information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC) maintain and preserve the environmental resources at the WIPP facility. DOE Order 231.1B; DOE Order 436.1, Departmental Sustainability; and DOE Order 458.1, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1B, which requires DOE facilities to submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer.

  8. Slipstream pilot-scale demonstration of a novel amine-based post-combustion technology for carbon dioxide capture from coal-fired power plant flue gas

    Energy Technology Data Exchange (ETDEWEB)

    Krishnamurthy, Krish R. [Linde LLC, Murray Hill, NJ (United States)

    2017-02-03

    Post-combustion CO2 capture (PCC) technology offers flexibility to treat the flue gas from both existing and new coal-fired power plants and can be applied to treat all or a portion of the flue gas. Solvent-based technologies are today the leading option for PCC from commercial coal-fired power plants as they have been applied in large-scale in other applications. Linde and BASF have been working together to develop and further improve a PCC process incorporating BASF’s novel aqueous amine-based solvent technology. This technology offers significant benefits compared to other solvent-based processes as it aims to reduce the regeneration energy requirements using novel solvents that are very stable under the coal-fired power plant feed gas conditions. BASF has developed the desired solvent based on the evaluation of a large number of candidates. In addition, long-term small pilot-scale testing of the BASF solvent has been performed on a lignite-fired flue gas. In coordination with BASF, Linde has evaluated a number of options for capital cost reduction in large engineered systems for solvent-based PCC technology. This report provides a summary of the work performed and results from a project supported by the US DOE (DE-FE0007453) for the pilot-scale demonstration of a Linde-BASF PCC technology using coal-fired power plant flue gas at a 1-1.5 MWe scale in Wilsonville, AL at the National Carbon Capture Center (NCCC). Following a project kick-off meeting in November 2011 and the conclusion of pilot plant design and engineering in February 2013, mechanical completion of the pilot plant was achieved in July 2014, and final commissioning activities were completed to enable start-up of operations in January 2015. Parametric tests were performed from January to December 2015 to determine optimal test conditions and evaluate process performance over a variety of operation parameters. A long-duration 1500-hour continuous test campaign was performed from May to

  9. Bonus systems and their effects on safety: an interview-based pilot study at the Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Torbioern, Ingemar; Mattson, Malin

    2009-03-01

    The aim of this pilot study has been to describe and analyse potential effects on safety-related behaviour and risks associated with the bonus systems currently used at Swedish nuclear plants. To this end and in order to establish a frame of reference several theories on motivation were consulted regarding the relevance of monetary rewards. In addition empirical evidence on effects upon behaviours in general and safety behaviours in particular was taken into consideration, as well as a systems and a rationalist perspective on organisations. The resulting frame of reference was used for a descriptive mapping of the bonus systems and for the formulation of a semi-structured interview schedule intended to capture the experiences of those concerned by the systems. A total of 15 interviews were performed with staff of different functions and organisational positions. Results of the study do not indicate any negative effects on safety-related behaviours. Rather they indicate that safety-behaviours may be promoted insofar as bonus rewards are linked to performance goals concerning safety. All of the bonus-systems may be characterised as low in incentive intensity, i.e. produce small effects on motivation and performance. Still, as the systems differ in design and in the way they are perceived, they also represent different challenges in order to function more efficiently as parameters

  10. Conditioning of spent fuel for interim and final storage in the pilot conditioning plant (PKA) at Gorleben

    International Nuclear Information System (INIS)

    Lahr, H.; Willax, H.O.; Spilker, H.

    1999-01-01

    In 1994, due to the change of the nuclear law in Germany, the concept of direct final disposal for spent fuel was developed as an equivalent alternative to the waste management with reprocessing. Since 1979, tests for the direct final disposal of spent fuel have been conducted in Germany. In 1985, the State and the utilities came to an agreement to develop this concept of waste management to technical maturity. Gesellschaft fuer Nuklear-Service (GNS) was commissioned by the utilities with the following tasks: to develop and test components with regard to conditioning technology, to construct and operate the pilot conditioning plant (PKA), and to develop casks suitable for final disposal. Since 1990, the construction of the PKA has taken place at the Brennelementlager Gorleben site. The PKA has been designed as a multipurpose facility and can thus fulfil various tasks within the framework of the conditioning and management of spent fuel assemblies and radioactive waste. The pilot character of the plant allows for development and testing in the field of spent fuel assembly conditioning. The objectives of the PKA may be summarized as follows: to condition spent fuel assemblies, to reload spent fuel assemblies and waste packages, to condition radioactive waste, and to do maintenance work on transport and storage casks as well as on waste packages. Currently, the buildings of the PKA are constructed and the technical facilities are installed. The plant will be ready for service in the middle of 1999. It is the first plant of its kind in the world. (author)

  11. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  12. Field-reversed mirror pilot reactor. Annual report

    International Nuclear Information System (INIS)

    Devoto, R.S.; Erickson, J.L.; Fink, J.H.

    1980-09-01

    This report concludes a two-year effort to design a near-term small-scale fusion power plant which, through its construction and operation, would be a direct and important step toward the commercialization of fusion energy. The fusion reactor pilot plant was designed under the ground rules that it must produce net power, be compact, have minimum total cost, and use near-term (late 1980's) engineering technology. The neutral beam driven, field-reversed mirror (FRM) was selected as the fusion plasma confinement concept around which the pilot plant was designed. Although the physics data base for this design is not yet well in hand, it is being pursued within the magnetic field-reversal framework of the US Mirror Fusion Program. Depending on the plasma size, the pilot plant would gross up to 19.8 MW(e) and would produce up to 10.7 MW(e) net, with the recirculated power used principally for the neutral beam injectors and refrigeration for the superconducting magnets

  13. Pilot plant experiments for the denitration and mercury separation from the HEWC solutions

    International Nuclear Information System (INIS)

    Humblet, L.; Hendrickx, J.P.; Geel, J. van.

    1984-06-01

    A process development for the elimination of mercury and nitrates from the HEWC (high-enriched waste concentrates) solutions has been achieved. This process is based on the reduction of mercury to metal with formaldehyde. The pilot plant which has enabled to test the developed process is described as well as the experiments. The residual mercury concentration is of 25 mg/1 but the mechanism of the reduction is not yet known. During the denitration the nitrous vapors production calls for an oversized absorption column. The control instruments and the analytical methods are also described. (AF)β

  14. Waste Isolation Pilot Plant simulated RH TRU waste experiments: Data and interpretation pilot

    International Nuclear Information System (INIS)

    Molecke, M.A.; Argueello, G.J.; Beraun, R.

    1993-04-01

    The simulated, i.e., nonradioactive remote-handled transuranic waste (RH TRU) experiments being conducted underground in the Waste Isolation Pilot Plant (WIPP) were emplaced in mid-1986 and have been in heated test operation since 9/23/86. These experiments involve the in situ, waste package performance testing of eight full-size, reference RH TRU containers emplaced in horizontal, unlined test holes in the rock salt ribs (walls) of WIPP Room T. All of the test containers have internal electrical heaters; four of the test emplacements were filled with bentonite and silica sand backfill materials. We designed test conditions to be ''near-reference'' with respect to anticipated thermal outputs of RH TRU canisters and their geometrical spacing or layout in WIPP repository rooms, with RH TRU waste reference conditions current as of the start date of this test program. We also conducted some thermal overtest evaluations. This paper provides a: detailed test overview; comprehensive data update for the first 5 years of test operations; summary of experiment observations; initial data interpretations; and, several status; experimental objectives -- how these tests support WIPP TRU waste acceptance, performance assessment studies, underground operations, and the overall WIPP mission; and, in situ performance evaluations of RH TRU waste package materials plus design details and options. We provide instrument data and results for in situ waste container and borehole temperatures, pressures exerted on test containers through the backfill materials, and vertical and horizontal borehole-closure measurements and rates. The effects of heat on borehole closure, fracturing, and near-field materials (metals, backfills, rock salt, and intruding brine) interactions were closely monitored and are summarized, as are assorted test observations. Predictive 3-dimensional thermal and structural modeling studies of borehole and room closures and temperature fields were also performed

  15. FY 1979 Annual report on Sunshine Project results. Fabrication designs for a solar thermal power pilot plant with curved-surface type light-collecting system (Part 1); 1979 nendo taiyonetsu hatsuden (kyokumen shuko hoshiki) seika hokokusho. 1. Pilot plant no seisaku ksekkei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    This report describes basic and fabrication design specifications for operation and control of a solar thermal power pilot plant with curved-surface type light-collecting system, centered by computer for the plant control. Chapter I, basic fabrication design specifications, describes the general, design specifications and design scope. Chapter II, system design specifications, describes plant operating manuals, computer-aided plant control, computer-aided data processing for plant control, and analysis of system characteristics. Chapter III, hardware specifications, describes the specifications of central processing unit (CPU), fixed head disc device (M DISC), console inputting/outputting device, process inputting/outputting device, logging typewriter, process display (CRT), cassette magnetic tape device, operator console, relay cubicle, power source panel for computer, and hardware lists. Chapter IV, attachments, contains the following documents: plant operating manuals, operation procedure flow charts, control processing specifications, control function specifications, APS console function specifications, computer inputting/outputting point list, and data processing function instructions. The attachment documents are also contained in Part 2 of JN0040512. (NEDO)

  16. Safety concerning the alteration in fuel material usage (new installation of the uranium enrichment pilot plant) at Ningyo Pass Mine of Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1978-01-01

    A report of the Committee on Examination of Nuclear Fuel Safety was presented to the Atomic Energy Commission of Japan, which is concerned with the safety in the alteration of fuel material usage (new installation of the uranium enrichment pilot plant) at the Ningyo Pass Mine. Its safety was confirmed. The alteration, i.e. installation of the uranium enrichment pilot plant, is as follows. Intended for the overall test of centrifugal uranium enrichment technology, the pilot plant includes a two-storied main building of about 9,000 m 2 floor space, containing centrifuges, UF 6 equipment, etc., a uranium storage of about 1,000 m 2 floor space, and a waste water treatment facility, two-storied with about 300 m 2 floor space. The contents of the examination are safety of the facilities, criticality control, radiation control, waste treatment, and effects of accidents on the surrounding environment. (Mori, K

  17. Determination of Waste Isolation Pilot Plant (WIPP) management and institutional requirements documents for contact-handled (CH) critical systems

    International Nuclear Information System (INIS)

    1990-01-01

    This document lists the critical requirements documents applicable to the receipt of contact-handled waste at the Waste Isolation Pilot Plant. It also describes the processes used to determine the applicability of each document. This analysis is based on the applicable documents that were in effect in the February 1988 time frame. 2 refs

  18. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    International Nuclear Information System (INIS)

    Best, T.L.; Neuhauser, S.

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed

  19. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    Energy Technology Data Exchange (ETDEWEB)

    Best, T.L.; Neuhauser, S. (eds.)

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

  20. Centrifuge Study of Pilot Tolerance to Acceleration and the Effects of Acceleration on Pilot Performance

    Science.gov (United States)

    Creer, Brent Y.; Smedal, Harald A.; Wingrove, Rodney C.

    1960-01-01

    A research program the general objective of which was to measure the effects of various sustained accelerations on the control performance of pilots, was carried out on the Aviation Medical Acceleration Laboratory centrifuge, U.S. Naval Air Development Center, Johnsville, PA. The experimental setup consisted of a flight simulator with the centrifuge in the control loop. The pilot performed his control tasks while being subjected to acceleration fields such as might be encountered by a forward-facing pilot flying an atmosphere entry vehicle. The study was divided into three phases. In one phase of the program, the pilots were subjected to a variety of sustained linear acceleration forces while controlling vehicles with several different sets of longitudinal dynamics. Here, a randomly moving target was displayed to the pilot on a cathode-ray tube. For each combination of acceleration field and vehicle dynamics, pilot tracking accuracy was measured and pilot opinion of the stability and control characteristics was recorded. Thus, information was obtained on the combined effects of complexity of control task and magnitude and direction of acceleration forces on pilot performance. These tests showed that the pilot's tracking performance deteriorated markedly at accelerations greater than about 4g when controlling a lightly damped vehicle. The tentative conclusion was also reached that regardless of the airframe dynamics involved, the pilot feels that in order to have the same level of control over the vehicle, an increase in the vehicle dynamic stability was required with increases in the magnitudes of the acceleration impressed upon the pilot. In another phase, boundaries of human tolerance of acceleration were established for acceleration fields such as might be encountered by a pilot flying an orbital vehicle. A special pilot restraint system was developed to increase human tolerance to longitudinal decelerations. The results of the tests showed that human tolerance

  1. Effect of different plant species in pilot constructed wetlands for wastewater reuse in agriculture

    Directory of Open Access Journals (Sweden)

    Salvatore Barbagallo

    2013-09-01

    Full Text Available In this paper the first results of an experiment carried out in Southern Italy (Sicily on the evapotranspiration (ET and removal in constructed wetlands with five plant species are presented. The pilot plant used for this study is made of twelve horizontal sub-surface flow constructed wetlands (each with a surface area of 4.5 m2 functioning in parallel, and it is used for tertiary treatment of part of the effluents from a conventional municipal wastewater treatment plant (trickling filter. Two beds are unplanted (control while ten beds are planted with five different macrophyte species: Cyperus papyrus, Vetiveria zizanoides, Miscanthus x giganteus, Arundo donax and Phragmites australis (i.e., every specie is planted in two beds to have a replication. The influent flow rate is measured in continuous by an electronic flow meter. The effluent is evaluated by an automatic system that measure the discharged volume for each bed. Physical, chemical and microbiological analyses were carried out on wastewater samples collected at the inlet of CW plant and at the outlet of the twelve beds. An automatic weather station is installed close to the experimental plant, measuring air temperature, wind speed and direction, rainfall, global radiation, relative humidity. This allows to calculate the reference Evapotranspiration (ET0 with the Penman-Monteith formula, while the ET of different plant species is measured through the water balance of the beds. The first results show no great differences in the mean removal performances of the different plant species for TSS, COD and E.coli, ranged from, respectively, 82% to 88%, 60% to 64% and 2.7 to 3.1 Ulog. The average removal efficiency of nutrient (64% for TN; 61 for NH4-N, 31% for PO4-P in the P.australis beds was higher than that other beds. From April to November 2012 ET measured for plant species were completely different from ET0 and ETcontrol, underlining the strong effect of vegetation. The cumulative

  2. Field evaluation of a horizontal well recirculation system for groundwater treatment: Pilot test at the Clean Test Site Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    International Nuclear Information System (INIS)

    Muck, M.T.; Kearl, P.M.; Siegrist, R.L.

    1998-01-01

    This report presents the results of field testing a horizontal well recirculation system at the Portsmouth Gaseous Diffusion Plant (PORTS). The recirculation system uses a pair of horizontal wells, one for groundwater extraction and treatment and the other for reinjection of treated groundwater, to set up a recirculation flow field. The induced flow field from the injection well to the extraction well establishes a sweeping action for the removal and treatment of groundwater contaminants. The overall purpose of this project is to study treatment of mixed groundwater contaminants that occur in a thin water-bearing zone not easily targeted by traditional vertical wells. The project involves several research elements, including treatment-process evaluation, hydrodynamic flow and transport modeling, pilot testing at an uncontaminated site, and pilot testing at a contaminated site. The results of the pilot test at an uncontaminated site, the Clean Test Site (CTS), are presented in this report

  3. Mill tailings disposal and environmental monitoring at the Ningyo-Toge uranium processing pilot plant

    International Nuclear Information System (INIS)

    Iwata, I.; Kitahara, Y.; Takenaka, S.; Kurokawa, Y.

    1978-01-01

    The tailings from the uranium processing pilot plant with a maximum ore processing capacity of 50 t/d are transferred to a tailings dam. The overflow from the dam is chemically treated and through settling ponds, sand filters to be discharged into a river. The concentrations of U, 226 Ra, pH, S.S., COD, Fe, Mn, Cl and F were monitored periodically and they were all below the control values. The results of monitoring on the river bed and rice paddy soil showed no signs of accumulation of U and 226 Ra in it

  4. Report of the study grou: Data Processing in Reprocessing Plants

    International Nuclear Information System (INIS)

    1976-08-01

    A study group to examine Data Processing in Spent Fuel Reprocessing Plants was created at the request of the Head of Productions and entrusted to the Director of the La Hague Centre. The groupe was made up of engineers working in different fields: piloting, architecture, building outfits, services etc. To begin with the group examined the solutions proposed by the La Hague Centre for the replacement of data processing units in service at the time but too old and unreliable to meet the safety rules laid down. Secondly, as a contribution towards France's heritage in the fuel reprocessing field, the group investigated systems and configurations for possible application to the equipment of future plants. The results of these studies were submitted in January 1974 [fr

  5. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    International Nuclear Information System (INIS)

    2006-01-01

    This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, 'Environmental Standards for Management and Storage'; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] 7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. 6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. 300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. 2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

  6. Evaluation of the Waste Isolation Pilot Plant classification of systems, structures and components

    International Nuclear Information System (INIS)

    1985-07-01

    A review of the classification system for systems, structures, and components at the Waste Isolation Pilot Plant (WIPP) was performed using the WIPP Safety Analysis Report (SAR) and Bechtel document D-76-D-03 as primary source documents. The regulations of the US Nuclear Regulatory Commission (NRC) covering ''Disposal of High level Radioactive Wastes in Geologic Repositories,'' 10 CFR 60, and the regulations relevant to nuclear power plant siting and construction (10 CFR 50, 51, 100) were used as standards to evaluate the WIPP design classification system, although it is recognized that the US Department of Energy (DOE) is not required to comply with these NRC regulations in the design and construction of WIPP. The DOE General Design Criteria Manual (DOE Order 6430.1) and the Safety Analysis and Review System for AL Operation document (AL 54f81.1A) were reviewed in part. This report includes a discussion of the historical basis for nuclear power plant requirements, a review of WIPP and nuclear power plant classification bases, and a comparison of the codes and standards applicable to each quality level. Observations made during the review of the WIPP SAR are noted in the text of this reoport. The conclusions reached by this review are: WIPP classification methodology is comparable to corresponding nuclear power procedures. The classification levels assigned to WIPP systems are qualitatively the same as those assigned to nuclear power plant systems

  7. Existing conditions socioeconomic portion. Waste isolation pilot plant environmental impact report, chapter 2, sections 2. 2, 2. 3

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    The population characteristics and the economic setting of Eddy and Lea Counties, New Mexico, are reviewed as related to site selection for a radioactive waste isolation pilot plant. Sections are included on population distribution, basic industries, trade and services, financial resources, personal income, tourism, labor force, employment, land use, water systems, utilities, transportation, and local government. (JRD)

  8. Existing conditions socioeconomic portion. Waste isolation pilot plant environmental impact report, chapter 2, sections 2.2, 2.3

    International Nuclear Information System (INIS)

    1978-07-01

    The population characteristics and the economic setting of Eddy and Lea Counties, New Mexico, are reviewed as related to site selection for a radioactive waste isolation pilot plant. Sections are included on population distribution, basic industries, trade and services, financial resources, personal income, tourism, labor force, employment, land use, water systems, utilities, transportation, and local government

  9. Pilot plant for the radioactive decontamination of spent oils; Planta piloto para la descontaminacion radiactiva de aceites gastados

    Energy Technology Data Exchange (ETDEWEB)

    Flores E, R.M.; Ortiz O, H.V.; Cisneros L, L.; Lopez G, R. [Instituto Nacional de Investigaciones Nucleares, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    2002-07-01

    In this work the operation parameters obtained in the laboratory of oil storage are presented, as well as the operations which shape the pilot plant, the design criteria and the basic design of the core equipment of the developed process. Finally, the comparative results obtained the decontamination process of oil are given as well as laboratory scale. (Author)

  10. Preoperational checkout of the remote-handled transuranic waste handling at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1987-09-01

    This plan describes the preoperational checkout for handling Remote-Handled Transuranic (RH-TRU) Wastes from their receipt at the Waste Isolation Pilot Plant (WIPP) to their emplacement underground. This plan identifies the handling operations to be performed, personnel groups responsible for executing these operations, and required equipment items. In addition, this plan describes the quality assurance that will be exercised throughout the checkout, and finally, it establishes criteria by which to measure the success of the checkout. 7 refs., 5 figs

  11. A mixed method pilot study: the researchers' experiences.

    Science.gov (United States)

    Secomb, Jacinta M; Smith, Colleen

    2011-08-01

    This paper reports on the outcomes of a small well designed pilot study. Pilot studies often disseminate limited or statistically meaningless results without adding to the body knowledge on the comparative research benefits. The design a pre-test post-test group parallel randomised control trial and inductive content analysis of focus group transcripts was tested specifically to increase outcomes in a proposed larger study. Strategies are now in place to overcome operational barriers and recruitment difficulties. Links between the qualitative and quantitative arms of the proposed larger study have been made; it is anticipated that this will add depth to the final report. More extensive reporting on the outcomes of pilot studies would assist researchers and increase the body of knowledge in this area.

  12. FY 1992 report on the results of the development of an entrained bed coal gasification power plant. Part 1. Element study/Technical survey; 1992 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Youso kenkyu hen, gijutsu chosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, element study of a 200 t/d entrained bed coal gasification pilot plant was made, and the FY 1992 results were summarized. In the gasification test using a 2 t/d furnace equipment, study was made of the extraction of subjects on the operation, performance of gasification, slagging characteristics and characteristics of flux addition. In the study of slag utilization technology, chemical analysis, test on fine aggregate and test on fine particle were carried out to study applicability of the slag discharged from the entrained bed coal gasification power plant to various materials. In the study of a large gas turbine combustor for the demonstrative machine, the demonstrative machine use large gas turbine combustor testing equipment was installed at actual pressure/actual size combustion testing facilities in the pilot plant and further the test use combustor was integrated into them. By using them, the real gas combustion test was made using the adjusted coal for evaluation of combustion performance of the test use combustor. In the simulation study of the total pilot plant system, the comparative study was made between the data on the test using the actual machine and the results of the simulation. (NEDO)

  13. Modification of the ventilation system at Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Sethi, S.C.

    1987-01-01

    The WIPP (Waste Isolation Pilot Plant) Project near Carlsbad, New Mexico, is a research and development project sponsored by the US Department of Energy, designed to demonstrate the safe disposal of radioactive waste. A mine (repository) is being developed 2,150 feet below the surface in a thick salt bed, which will serve as the disposal medium. The underground ventilation system for the WIPP project was originally designed based on a fixed project scope. The design criteria and ventilation requirements were developed for the performance of various activities as then envisioned towards the achievement of this goal. However, in light of new information and actual site-specific experience at WIPP leading to a clearer definition of the scope-related programs and activities, it was realized that the existing ventilation system may need to be modified

  14. Execution of pilot tests for an uranium in situ leaching project

    International Nuclear Information System (INIS)

    Koch, H.J.

    1983-01-01

    Urangesellschaft is presently evaluating the technical and economic feasibility of an in situ leaching (ISL) project in Wyoming/USA. This report describes the basic technical principles for ISL-uranium projects and gives the reasons for conducting pilot tests prior to the construction of a commercial plant. It further describes the licensing requirements for an ISL-pilot plant and evaluates the results of the pilot tests. (orig.) [de

  15. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    Science.gov (United States)

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  16. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2008-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  17. DOLOMITE DESULFURIZATION BEHAVIOR IN A BUBBLING FLUIDIZED BED PILOT PLANT FOR HIGH ASH COAL

    Directory of Open Access Journals (Sweden)

    G. M. F. Gomes

    Full Text Available Abstract Although fluidized bed in situ desulphurization from coal combustion has been widely studied, there are aspects that remain under investigation. Additionally, few publications address Brazilian coal desulphurization via fluidized beds. This study used a 250 kWth bubbling fluidized bed pilot plant to analyze different aspects of the dolomite desulphurization of two Brazilian coals. Superficial velocities of 0.38 and 0.46 m/s, flue gas recycling, Ca/S molar ratios and elutriation were assessed. Results confirmed the influence of the Ca/S molar ratio and superficial velocity - SO2 conversion up to 60.5% was achieved for one coal type, and 70.9% was achieved for the other type. A recycling ratio of 54.6% could increase SO2 conversion up to 86.1%. Elutriation and collection of ashes and Ca-containing products did not present the same behavior because a lower wt. % of CaO was collected by the gas controlled mechanism compared to the ash.

  18. Effect of ZSM-5 on the production of reformulated gasoline. Comparison between FCC pilot plant and commercial results

    International Nuclear Information System (INIS)

    Lappas, A.A.; Iatridis, D.; Vasalos, I.A.; Phyxogios, G.

    1999-01-01

    One of the more interesting ways for production of light olefins and for minimization of Gasoline olefins is the use of catalytic additives in the FCC (fluid catalytic cracking) inventory. The most widely used additive for the FCC process is the ZSM-5 which is a shape selective zeolite. When this additive is added to FCC units, it boosts the yields of LPG's olefins at the expense of gasoline, while increasing gasoline RON. The addition of ZSM-5 offers a great flexibility to a refinery since, in a relatively simple and cheap way, it can increase the RON and produces higher yields of light olefins. For all the above reasons the last years more studies are carried out in order to investigate the effect of this additive. In study presented in this paper, main emphasis was given, for the investigation of the effect of ZSM- 5 addition on FCC product distribution and especially on gasoline olefins. Moreover, in the previous literature works the ZSM-5 influences were examined using mainly fixed bed reactors. In the present study the investigation was carried out in a FCC pilot plant. The additive was also added in a commercial FCC unit of a Greek refinery (Hellenic Aspropyrgos Refinery - HAR) and thus comparison results of commercial and pilot plant test are also presented. The above study is part of a research collaboration which exists the last 10 years between the laboratory of Environmental Fuels and hydrocarbons of Chemical Process Engineering Research Institute (LEFH/CPERI) and the main Greek refineries (HEL.PETROLEUM, Motor Oil Hellas Refinery). The target of this research collaboration is i) the development of technology for the production of reformulated fuels and hydrocarbons and ii) to assist the Greek refineries to face the new regulations for environmental friendly fuels

  19. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant (Mechanical fabrication)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper prepared plans of the mechanical equipment in the detailed design of a pilot plant in the joint research project on the environmental protection technology for highly efficient mineral resource extraction and treatment. (NEDO)

  20. Tracking and quantification of nitrifying bacteria in biofilm and mixed liquor of a partial nitrification MBBR pilot plant using fluorescence in situ hybridization

    International Nuclear Information System (INIS)

    Abzazou, Tarik; Araujo, Rosa M.; Auset, María; Salvadó, Humbert

    2016-01-01

    A moving bead biofilm reactor (MBBR) pilot plant was implemented as a partial nitrification process for pre-treatment of ammonium-rich liquors (676 ± 195 mg L"−"1), and studied for 479 days under variations in hydraulic retention time. The main purpose of this work, was the study of dynamics abundance of total bacteria and single-cells nitrifying bacteria belonging to ammonia-oxidizing bacteria (AOB) and nitrite-oxidizing bacteria (NOB) in biofilms and mixed liquor of the plant. The microbial monitoring was successfully achieved using fluorescence in situ hybridization combined with flocs disaggregation protocol as a useful microbial monitoring tool. A partial nitrification process with a N-NH_4"+ removal rate of about 38.6 ± 14.8% was successfully achieved at 211 days after start-up, with a clear dominance of AOB, which accounted for 11.3 ± 17.0% of total bacterial cells compared with only 2.1 ± 4.0% of NOB. The effluent obtained was subsequently supplied to an Anammox reactor for complete ammonium treatment. - Highlights: • Partial nitrification process in a MBBR fed with ammonium-rich liquor was achieved. • The operational key parameters were the HRT and temperature. • DAPI and FISH were useful to monitoring microbial composition of MBBR pilot plant. • The AOB were the dominant nitrifying bacteria, presenting 11.3% of total bacteria. • A significant correlation (R = 0.68) between AOB and ammonia removal was found.

  1. Tracking and quantification of nitrifying bacteria in biofilm and mixed liquor of a partial nitrification MBBR pilot plant using fluorescence in situ hybridization

    Energy Technology Data Exchange (ETDEWEB)

    Abzazou, Tarik, E-mail: tabzazou@ub.edu [Department of Microbiology, Faculty of Biology, University of Barcelona, Av. Diagonal 643, 08028 Barcelona (Spain); Araujo, Rosa M., E-mail: raraujo@ub.edu [Department of Microbiology, Faculty of Biology, University of Barcelona, Av. Diagonal 643, 08028 Barcelona (Spain); Auset, María, E-mail: maria.auset.vallejo@acciona.com [ACCIONA AGUA, S.A., Av de les Garrigues 22, El Prat de Llobregat, 08820 Barcelona (Spain); Salvadó, Humbert, E-mail: hsalvado@ub.edu [Department of Animal Biology, Faculty of Biology, University of Barcelona, Av. Diagonal 643, 08028 Barcelona (Spain)

    2016-01-15

    A moving bead biofilm reactor (MBBR) pilot plant was implemented as a partial nitrification process for pre-treatment of ammonium-rich liquors (676 ± 195 mg L{sup −1}), and studied for 479 days under variations in hydraulic retention time. The main purpose of this work, was the study of dynamics abundance of total bacteria and single-cells nitrifying bacteria belonging to ammonia-oxidizing bacteria (AOB) and nitrite-oxidizing bacteria (NOB) in biofilms and mixed liquor of the plant. The microbial monitoring was successfully achieved using fluorescence in situ hybridization combined with flocs disaggregation protocol as a useful microbial monitoring tool. A partial nitrification process with a N-NH{sub 4}{sup +} removal rate of about 38.6 ± 14.8% was successfully achieved at 211 days after start-up, with a clear dominance of AOB, which accounted for 11.3 ± 17.0% of total bacterial cells compared with only 2.1 ± 4.0% of NOB. The effluent obtained was subsequently supplied to an Anammox reactor for complete ammonium treatment. - Highlights: • Partial nitrification process in a MBBR fed with ammonium-rich liquor was achieved. • The operational key parameters were the HRT and temperature. • DAPI and FISH were useful to monitoring microbial composition of MBBR pilot plant. • The AOB were the dominant nitrifying bacteria, presenting 11.3% of total bacteria. • A significant correlation (R = 0.68) between AOB and ammonia removal was found.

  2. Pilot test of flue gas treatment by electron beam

    International Nuclear Information System (INIS)

    Tokunaga, Okihiro

    1995-01-01

    The development of the technology of the desulfurization and denitration for flue gas by using electron beam was started in Japan in 1970s, and since then, the development research for putting it to practical use and the basic research on the subjects which must be resolved for promoting the practical use have been advanced. Based on these results, the verifying test using a pilot scale plant was carried out from 1991 to 1994 for the treatment of coal-burning flue gas, municipal waste-burning flue gas and highway tunnel exhaust gas. The operation of the pilot plant was already finished, and the conceptual design of a practical scale plant based on the results and the assessment of the economical efficiency were performed. As for the coal-burning flue gas treatment by using electron beam, the basic test, the pilot test and the conceptual design of a practical scale plant and the assessment of the economical efficiency are reported. As for the municipal waste-burning flue gas treatment by using electron beam, the basic test and the pilot test are reported. Also the pilot test on the denitration of exhaust gas in highway tunnels in reported. In Poland, the pilot test on the treatment of flue gas in coal-burning thermal power stations is carried out. In Germany, the technical development for cleaning the air contaminated by volatile organic compounds by electron beam irradiation is advanced. (K.I.)

  3. The Purlex process - a description of the pilot plant leading to the use of the process in South Africa

    International Nuclear Information System (INIS)

    Tunley, T.H.; Faure, A.

    1969-01-01

    This report briefly describes the pilot plant and highlights the important findings of the testwork. Particular attention is paid to the problems which arose during the two-year period of operation and the steps taken to solve these problems. Average values are given for the important parameters for the various test periods

  4. Results of exploitation of a pilot-plant installation for bituminization of radioactive sludges

    International Nuclear Information System (INIS)

    Golinski, M.; Ksiazak, Z.; Surala, J.; Dziubecki, R.

    1974-01-01

    Results are discussed of exploitation of a pilot-plant installation for bituminization of radioactive sludges of an efficiency of 25 l/h. In a time period of 20 month 120 cycles were carried out in which 60 m 3 of 2-4% sludges from treatment of low-level waste by the phosphate-ferrocyanide method were solidified. The P-60 asphalt was used for bituminization. The bituminization products contained 5-13.5% of mineral substances. Their activity was in the range 5 x 10 -4 - 5 x 10 -3 μCi/g for alpha emitters and 1.2 - 3.8 x 10 -2 μCi/g for beta emitters. (author)

  5. Mechanical compaction of Waste Isolation Pilot Plant simulated waste

    International Nuclear Information System (INIS)

    Butcher, B.M.; Thompson, T.W.; VanBuskirk, R.G.; Patti, N.C.

    1991-06-01

    The investigation described in this report acquired experimental information about how materials simulating transuranic (TRU) waste compact under axial compressive stress, and used these data to define a model for use in the Waste Isolation Pilot Plant (WIPP) disposal room analyses. The first step was to determine compaction curves for various simultant materials characteristic of TRU waste. Stress-volume compaction curves for various combinations of these materials were than derived to represent the combustible, metallic, and sludge waste categories. Prediction of compaction response in this manner is considered essential for the WIPP program because of the difficulties inherent in working with real (radioactive) waste. Next, full-sized 55-gallon drums of simulated combustible, metallic, and sludge waste were axially compacted. These results provided data that can be directly applied to room consolidation and data for comparison with the predictions obtained in Part 1 of the investigation. Compaction curves, which represent the combustible, metallic, and sludge waste categories, were determined, and a curve for the averaged waste inventory of the entire repository was derived. 9 refs., 31 figs., 12 tabs

  6. The waste isolation pilot plant project: a changing paradigm

    International Nuclear Information System (INIS)

    Sheppard, L.E.; McFadden, M.H.

    1996-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) repository that has been developed to demonstrate the safe and permanent isolation of transuranic radioactive wastes in a deep geologic site. It is located in 650 m below the surface in a bedded salt formation, and is designed to hold approximately 175,500 cubic meters of waste. Compliance with the regulations has become the principal focus for the Project. The scientific baseline is an important and integral part of the CCA, as it provides the foundation for conducting total system performance assessment calculations for comparison with applicable standards. The activities required to support the scientific baseline are being pursued in parallel to minimize the time required to collect, analyze, interpret and fully incorporate the results into the CCA. The DOE has shifted its approach to demonstrating compliance with the applicable regulations from a paradigm of a series of broad investigations to a new paradigm of highly focused activities conducted in parallel. The success of this approach will be assessed by the EPA when the application is critically reviewed

  7. Resource conversation and recovery act draft hazardous waste facility permit: Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    1993-08-01

    Volume II contains attachments for Module II and Module III. Attachments for Module II are: part A permit application; examples of acceptable documentation; Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program; inspection schedule and monitoring schedule; inspection log forms; personnel training course outlines; hazardous waste job position training requirements; contingency plan; closure plan; and procedures for establishing background for the underground units. One attachment, facility process information, is included for Module III. Remaining attachments for this module are in Volume III

  8. Solar Pilot Plant, Phase I. Preliminary design report. Volume II. System description and system analysis. CDRL item 2

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-05-01

    Honeywell conducted a parametric analysis of the 10-MW(e) solar pilot plant requirements and expected performance and established an optimum system design. The main analytical simulation tools were the optical (ray trace) and the dynamic simulation models. These are described in detail in Books 2 and 3 of this volume under separate cover. In making design decisions, available performance and cost data were used to provide a design reflecting the overall requirements and economics of a commercial-scale plant. This volume contains a description of this analysis/design process and resultant system/subsystem design and performance.

  9. Waste Isolation Pilot Plant Title I operator dose calculations. Final report, LATA report No. 90

    International Nuclear Information System (INIS)

    Hughes, P.S.; Rigdon, L.D.

    1980-02-01

    The radiation exposure dose was estimated for the Waste Isolation Pilot Plant (WIPP) operating personnel who do the unloading and transporting of the transuranic contact-handled waste. Estimates of the radiation source terms for typical TRU contact-handled waste were based on known composition and properties of the waste. The operations sequence for waste movement and storage in the repository was based upon the WIPP Title I data package. Previous calculations had been based on Conceptual Design Report data. A time and motion sequence was developed for personnel performing the waste handling operations both above and below ground. Radiation exposure calculations were then performed in several fixed geometries and folded with the time and motion studies for individual workers in order to determine worker exposure on an annual basis

  10. Hanford site as it relates to an alternative site for the Waste Isolation Pilot Plant: an environmental description

    Energy Technology Data Exchange (ETDEWEB)

    Fecht, K.R. (ed.)

    1978-12-01

    The use of basalt at Hanford as an alternative for the Waste Isolation Pilot Plant (WIPP) would require that the present Basalt Waste Isolation Program (BWIP) at Hanford be expanded to incorporate the planned WIPP functions, namely the permanent storage of transuranic (TRU) wastes. This report discusses: program costs, demography, ecology, climatology, physiography, hydrology, geology, seismology, and historical and archeological sites. (DLC)

  11. Hanford site as it relates to an alternative site for the Waste Isolation Pilot Plant: an environmental description

    International Nuclear Information System (INIS)

    Fecht, K.R.

    1978-12-01

    The use of basalt at Hanford as an alternative for the Waste Isolation Pilot Plant (WIPP) would require that the present Basalt Waste Isolation Program (BWIP) at Hanford be expanded to incorporate the planned WIPP functions, namely the permanent storage of transuranic (TRU) wastes. This report discusses: program costs, demography, ecology, climatology, physiography, hydrology, geology, seismology, and historical and archeological sites

  12. Waste Isolation Pilot Plant site environmental report for calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

  13. Waste Isolation Pilot Plant site environmental report for calendar year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site

  14. Waste Isolation Pilot Plant annual site environmental report for calendar year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) defined a comprehensive set of parameters which are monitored to detect potential environmental impacts and establish baselines for future environmental evaluations. Surface water and groundwater, air, soil, and biotics are monitored for radioactivity levels. Nonradiological environmental monitoring activities include air, water quality, soil properties, meteorological measurements and determination of the status of the local biological community. Ecological studies focus on the immediate area surrounding the WIPP site with emphasis on the salt storage pile. The baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in its preoperational phase (i.e., no waste has been received) certain operational requirements of DOE Orders 5400.1, 5400.5, and the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T) are not relevant. Therefore, this report does not discuss items such as radionuclide emissions and effluents and subsequent doses to the public.

  15. Waste Isolation Pilot Plant annual site environmental report for calendar year 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) defined a comprehensive set of parameters which are monitored to detect potential environmental impacts and establish baselines for future environmental evaluations. Surface water and groundwater, air, soil, and biotics are monitored for radioactivity levels. Nonradiological environmental monitoring activities include air, water quality, soil properties, meteorological measurements and determination of the status of the local biological community. Ecological studies focus on the immediate area surrounding the WIPP site with emphasis on the salt storage pile. The baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in its preoperational phase (i.e., no waste has been received) certain operational requirements of DOE Orders 5400.1, 5400.5, and the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T) are not relevant. Therefore, this report does not discuss items such as radionuclide emissions and effluents and subsequent doses to the public

  16. Properties and Performance of SOFCs Produced on a Pre-Pilot Plant Scale

    DEFF Research Database (Denmark)

    Hagen, Anke; Menon, Mohan; Barfod, Rasmus

    2006-01-01

    specific cell resistance at 850 °C was found to be 0.24 Ω cm2 with a standard deviation of 0.05 Ω cm2. The variation in performance between the cells can be largely attributed to variations in the cathode performance. Experimental evidence will be presented on full 4 × 4 cm2 cells, symmetric cells with two......In the present paper, anode supported solid oxide fuel cells (SOFCs), produced on a pre-pilot plant scale in ten batches of ∼100 cells, are characterised with respect to performance. The main purpose was to evaluate the reproducibility of the scaled-up process. Based on 20 tests, the average area...

  17. WIPP [Waste Isolation Pilot Plant] intermediate scale borehole test: A pretest analysis

    International Nuclear Information System (INIS)

    Argueello, J.G.

    1991-01-01

    A three-dimensional finite element structural analysis of the Intermediate Scale Borehole Test at the Waste Isolation Pilot Plant (WIPP) has been performed. The analysis provides insight into how a relatively new excavation in a creeping medium responds when introduced into an existing pillar which has been undergoing stress redistribution for 5.7 years. The stress field of the volume of material in the immediate vicinity of the borehole changes significantly when the hole is drilled. Closure of the hole is predicted to be larger in the vertical direction than in the horizontal direction, leading to an ovaling of the hole. The relatively high stresses near the hole persist even at the end of the simulation, 2 years after the hole is drilled. 12 ref., 10 figs

  18. Geomechanical monitoring system at the Waste Isolation Pilot Plant, Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    Francke, J.L.; Cook, R.F.; Carrasco, R.C.

    1993-01-01

    This paper describes in detail the geomechanical instrumentation system and the data base that has been established from the geomechanical monitoring program. In addition, it describes the quality assurance and control measures that are in place to ensure that the data from the underground is accurate, traceable, and defensible. The system is installed at the Waste Isolation Pilot Plant in Carlsbad, New Mexico. This facility is being developed for the disposal of transuranic nuclear wastes in underground excavations in salt 2150 feet below the surface. The purpose of the instrumentation system is to monitor the deformations and stress changes that are occurring in the rock with time. This information is needed to routinely assess conditions in the facility and to ensure that safe operating conditions are maintained

  19. Environmental Impact Statement: Waste Isolation Pilot Plant (WIPP): Executive summary

    International Nuclear Information System (INIS)

    1980-10-01

    The purpose of this document is to provide a summary of the environmental impact statement for the Waste Isolation Pilot Plant (WIPP) project. The Draft Environmental Impact Statement for the WIPP was published by the US Department of Energy (DOE) in April 1979. This document was reviewed and commented on by members of the general public, private organizations, and governmental agencies. The Final Environmental Impact Statement was subsequently published in October, 1980. This summary is designed to assist decision-maker and interested individuals in reviewing the material presented in the environmental impact statement for the WIPP project. To make this material widely available, this summary is published in both Spanish and English. Additional, more detailed information concerning the environmental and safety consequences of the WIPP project is available in the Final Environmental Impact Statement. Written comments and public hearing comments on the Draft Environmental Impact Statement are available for review. 27 refs., 4 figs., 7 tabs

  20. WIPP [Waste Isolation Pilot Plant] test phase plan: Performance assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs

  1. The 1996 performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Anderson, D.R.; Jow, H.N.; Marietta, M.G.; Chu, M.S.Y.; Shephard, L.E.; Helton, J.C.; Basabilvazo, G.

    1998-01-01

    The Waste Isolation Pilot Plant (WIPP) is under development by the US Department of Energy (DOE) for the geologic disposal of transuranic (TRU) waste that has been generated at government defense installations in the United States. The WIPP is located in an area of low population density in southeastern New Mexico. Waste disposal will take place in excavated chambers in a bedded salt formation approximately 655 m below the land surface. This presentation describes a performance assessment (PA) carried out at Sandia National Laboratories (SNL) to support the Compliance Certification Application (CCA) made by the DOE to the US Environmental Protection Agency (EPA) in October, 1996, for the certification of the WIPP for the disposal of TRU waste. Based on the CCA supported by the PA described in this presentation, the EPA has issued a preliminary decision to certify the WIPP for the disposal of TRU waste. At present (April 1998), it appears likely that the WIPP will be in operation by the end of 1998

  2. Radiological control in a mine with a naturally occurring radioactive material - NORM: II assessment of external exposition in a pilot plant

    International Nuclear Information System (INIS)

    Pereira, W.S.; Py Junior, D.A.; Silva, A.C.A.; Garcia Filho, O.

    2013-01-01

    In the year of 2009, a pilot plant for uranium extraction from a phosphate mine to be installed at Santa Quiteria city, Ceara state, Brazil was carried out at the Ore Treatment Unit (OTU). During the operation of the pilot plant, the monitoring of external exposure in the area used by the pilot plant was conducted. 157 measurements were taken saving the data of the exposure rate and converting them to external dose. The background (BG) of the area was measured before the beginning of the operation and was estimated as 0.340 μSv h -1 ; only two measurements, out of the 157, were below the BG. The dose rates varied from 0.304 μSv h -1 to 0.814 μSv h -1 , with an average equal to 0.544 μSv h -1 . When the results were compared to the derived limit for member of the public, which is equal to μSv h -1 , approximately 38 % of the results were below this limit. Approximately 50 % of the results were below 0.554 μSv h -1 and approximately 95 % of the results were below 0.754 μSv h -1 . By this criterion only, the area must be considered as a supervised area. In order to classify the area in definitive, the internal exposure must also be evaluated. In this installation significant internal doses are not to be expected, considering that most part of the process is conducted by a wet route, without dust or aerosol generation, that when inhaled should create internal doses. (author)

  3. The incidence of venous thromboembolism in commercial airline pilots: a cohort study of 2630 pilots.

    Science.gov (United States)

    Kuipers, S; Venemans-Jellema, A; Cannegieter, S C; van Haften, M; Middeldorp, S; Büller, H R; Rosendaal, F R

    2014-08-01

    Airline pilots may be at increased risk of venous thromboembolism (VTE) because air travel has recently been established as a risk factor for VTE. The aim of this study was to assess the risk of VTE in a cohort of Dutch airline pilots. Airline pilots who had been active members of the Dutch aviation society (VNV) were questioned for the occurrence of VTE, presence of risk factors for VTE and number of flight hours per year and rank. Incidence rates among pilots were compared with those of the general Dutch population and with a population of frequently flying employees of multinational organizations. A total of 2630 male pilots were followed-up for a total of 20420 person-years (py). Six venous thromboses were reported, yielding an incidence rate of 0.3 per 1000 py. The standardized morbidity ratio, comparing these pilots with the general Dutch population adjusted for age, was 0.8. Compared with the international employee cohort, the standardized morbidity ratio was 0.7 when all employees were included and 0.6 when only the frequently travelling employees were included. The incidence rate did not increase with number of flight hours per year and did not clearly vary by rank. We conclude that the risk of VTE is not increased amongst airline pilots. © 2014 International Society on Thrombosis and Haemostasis.

  4. Pilot plant development for adsorptive krypton separation from dissolver off-gas

    International Nuclear Information System (INIS)

    Ringel, H.; Printz, R.

    1987-01-01

    In view of hot cell application a separation process was investigated for the retention of Kr-85 from gaseous effluents. In the flow sheet only adsorption beds are applied. The most efficient process scheme is adsorption of the noble gas on activated charcoal and thereafter separation of the coadsorbed gas species like N 2 , O 2 , Xe and CO 2 from the krypton by gas chromatography. Adsorption is at normal pressure and low temperatures of up to -160 0 C, whereas desorption is at elevated temperatures and under helium purge. Influences on the process operation like off-gas composition, adsorption temperatures and adsorbent are experimentally investigated, as well as the behavior of trace impurities in the adsorption columns. On the basis of pilot plant operation the main components for a full scale facility are being designed

  5. Recent Pilot Plant Experience on Alkaline Leaching of Low Grade Uranium Ore in India

    Energy Technology Data Exchange (ETDEWEB)

    Suri, A. K; Ghosh, S. K.; Padmanabhan, N. P.H., [Bhabha Atomic Research Centre, Mumbai (India)

    2014-05-15

    Uranium deposits in India are low grade and are relatively smaller in extent as compared to present worldwide commercial practice. So far, the vein type deposits of Singhbhum Thrust Belt (STB) are being exploited for meeting the Indian requirements of uranium. The deposits are currently processed by acid leaching in the mills located at Jaduguda and Turamdih near Jamshedpur in Jharkhand State of India. The deposits at Jaduguda and Narwapahar are being mined by underground mining and are processed in Jaduguda mill using airagitated Pachucas. The deposits at Banduhurang and Turamdih are being mined by open cast and underground mining respectively and are processed at Turamdih by acid leaching in mechanically agitated reactors. The occurrences of uranium in North East and Northern part of Kadapa basin are relatively moderate in size and are expected to be processed in the near future by acid leaching. Uranium is also found to occur near Tummalapalle in granitic and limestone host rocks in Southern part of Kadapa basin (Andhra Pradesh) and in Gogi in Bhima basin (Karnataka). The deposit in Tummalapalle is relatively lower in grade (≈ 0.042% U{sub 3}O{sub 8}) but is a reasonably large reserve, whereas that in Gogi is rich in uranium content (≈0.18% U{sub 3}O{sub 8}) but is relatively small reserve. Laboratory tests based on alkaline leaching have been carried out on both types of deposits. Studies for Tummalapalle deposits have been extended to pilot plant level and a complete flow sheet has been established with the regeneration and recirculation of lixiviants and recovery of sodium sulphate as a by-product. The process involves alkaline leaching under oxygen pressure in batch type and/or continuous leach reactor using sodium carbonate/bicarbonate as a leaching media and uranium is recovered as sodium diuranate. Based on the techno-economic evaluation of the process, an industrial scale mill (3 000 tonnes ore/day) is being set up at Tummalapalle in Andhra Pradesh

  6. Experience with a pilot plant for the irradiation of sewage sludge

    International Nuclear Information System (INIS)

    Wizigmann, I.

    1976-01-01

    Reduction of viable micro-organisms could be achieved by irradiation of sewage sludge in a pilot plant ( 60 Co gamma-radiation 300 krad, 300 min.). The reduction amounted to an average of 2 log with Enterococces and total bacterial count and to 5 log with Enterobacteriaceae. Out of 23 sludge batches from digestor II, 21 were free of Salmonella after irradiation. Of 7 sludge batches from digestor I with a higher level of Enterobacteriaceae and Salmonellae, 5 batches still contained Salmonella after treatment. By making some alterations in the pipe system and reloading further cobalt 60-sources, the duration of irradiation could be reduced to 65 min. while maintaining the dose level of 300 krad. Employing this altered procedure, 16 batches from digestor II and 4 from digestor I were irradiated to date. Only in one of 60 samples were Salmonellae detectable. The hygienic effects of the irradiation plant were confirmed by means of model experiment with pure bacterial cultures. Microorganisms of different species as well as strains of the same species differ in their radiosensitivity. Parasitological experiments were conducted with Ascaris suum ova. No embryonation was noted after radiation treatment at a dose of 300 krad. (orig./HK) [de

  7. Decommissioning of uranium pilot plants at IPEN-CNEN/SP: Facilities dismantling, decontamination and reuse as new laboratories for strategic programs

    International Nuclear Information System (INIS)

    Oliveira Lainetti, P.; Freitas, A.; Cotrim, M.; Pires, M.

    2014-01-01

    Radical changes of the Brazilian nuclear policy, in the beginning of 1990s, determined the interruption of most nuclear fuel cycle activities and the facilities shutdown at IPEN. Those facilities had already played their roles of technological development and personnel's training, with transfer of the technology for institutions entrusted of the ''scale up'' of the units. Most of the pilot plants interrupted the activities more than ten years ago, due to the lack of resources for the continuity of the research. The appropriate facilities maintenance had been also harmed by the lack of resources, with evident signs of deterioration in structures and equipment. The existence of those facilities also implicated in the need of constant surveillance, representing additional obligations, costs and problems. It should be emphasized that one of the most concerning aspects, with relationship to the future of the facilities and the postponement of the dismantling, was the loss of the experience accumulated by the personnel that set up and operated the referred units. Besides the mentioned aspects, other reasons to promote the dismantling of the IPEN´s Nuclear Fuel Cycle Pilot Plants elapsed mainly from the need of physical space for new activities, since the R in the nuclear fuel cycle area were interrupted. In the last decade IPEN has changed its “nuclear profile” to a “comprehensive and multidisciplinary profile”. During this period, IPEN has been restructured in 13 Research Centers. With the end of most nuclear fuel cycle activities, the former facilities were distributed in four different centers: Environmental and Chemical Technology Center; Fuel Cell Center; Materials Science and Engineering Center; Nuclear Fuel Center. Each center has adopted a different strategy and priority to face the R problem and to reintegrate the areas. The resources available depend on the specific program developed in each area (resources available from other sources, not only CNEN

  8. Variable-density ground-water flow and paleohydrology in the Waste Isolation Pilot Plant (WIPP) region, southeastern New Mexico

    International Nuclear Information System (INIS)

    Davies, P.B.

    1989-01-01

    Variable-density groundwater flow was studied near the Waste Isolation Pilot Plant in southeastern New Mexico. An analysis of the relative magnitude of pressure-related and density-related flow-driving forces indicates that density-related gravity effects are not significant at the plant and to the west but are significant in areas to the north, northeast, and south. A regional-scale model of variable-density groundwater flow in the Culebra Dolomite member of the Rustler Formation indicates that the flow velocities are relatively rapid west of the site and extremely slow east and northeast of the site. In the transition zone between those two extremes, which includes the plant, velocities are highly variable. Sensitivity simulations indicates that the central and western parts of the region, including the plant, are fairly well isolated from the eastern and northeastern boundaries. Vertical-flux simulations indicate that as much as 25% of total inflow to the Culebra could be entering as vertical flow, with most of this flow occurring west of the plant. A simple cross-sectional model was developed to examine the flow system as it drains through time following recharge during a past glacial pluvial. This model indicates that the system as a whole drains very slowly and that it apparently could have sustained flow from purely transient drainage following recharge of the system during the Pleistocene

  9. Experimental Studies of Laser-Induced Fluorescence Spectra of Plants Immunity to the Kind of Ground

    Directory of Open Access Journals (Sweden)

    Yu. V. Fedotov

    2015-01-01

    Full Text Available Various external factors (pollutants available in the soil, a lack or insufficient amount of water and nutrients, etc. lead to stressful conditions of plants and impossibility of their normal development. At the early stages it is difficult to identify visually the stressful situations of plants. Therefore development of methods and devices to detect stressful states is important.A method of the laser-induced fluorescence is one of perspective methods for detection of stressful conditions of plants.In spite of quite a great number of work presenting results of the pilot studies of fluorescence spectra of vegetation, there are some important issues, which are unclear.The paper gives results of pilot studies of stability of a spectrum form of the laser-induced fluorescence of plants for different types of soil at the wavelength of excitation fluorescence of 532 nm.Results of processing fluorescence spectra of plants show:- fluorescence spectra of plants grown up under similar conditions have good repeatability of a spectra form for different samples of plants and different measurement time for each type of studied soil. The ratio value R of the fluorescence intensity at the wavelength of 685 nm to the fluorescence intensity at the wavelength of 740 nm has high stability. The standard deviation in sampling of the ratio R of different samples of a plant for one type of soil (for width of spectral ranges of recording fluorescent radiation of 10 nm lies in the range ~ 0.055 - ~ 0.12;- a difference in plant fluorescence spectra between themselves for different types of soil has the same order as a difference in fluorescence spectra of different samples of a plant for one type of soil. Difference in average value of the ratio R for different types of soil lies in the range ~ 0.01 - ~ 0.15.Thus, the value of the ratio R is steady against a type of soil and can be used to control a condition of plants.

  10. WIPP conceptual design report. Addendum F. HVAC systems energy analysis for Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1977-04-01

    This report presents the results of a technical and economic analysis of alternative methods of meeting the heating, ventilating, and air conditioning requirements of the Waste Isolation Pilot Plant (WIPP) facilities proposed to be constructed in southeastern New Mexico. This report analyzes a total of ten WIPP structures to determine the most energy and economic efficient means of providing heating, ventilating, and air conditioning services. Additional analyses were performed to determine the merits of centralized versus dispersed refrigeration and heating facilities, and of performing supplemental domestic hot water heating with solar panels

  11. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services

    2006-10-12

    This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, "Environmental Standards for Management and Storage"; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] §7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. §§6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. §§300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. §§2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

  12. Groundwater monitoring at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Kehrman, R.; Broberg, K.; Tatro, G.; Richardson, R.; Dasczcyszak, W.

    1990-01-01

    This paper discusses the Groundwater Monitoring Program (GPM) being conducted at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The Regulatory and Environmental Programs (REP) section of the Environment, Safety and Health department (ES ampersand H) is responsible for conducting environmental monitoring at the WIPP. Groundwater monitoring is one of the ongoing environmental activities currently taking place. The REP section includes water quality sampling and water level monitoring. The WIPP Project is a research and develop facility designed to demonstrate the safe disposal of defense-generated waste in a geologic repository. Water quality sampling for physical, chemical, and radiological parameters has been an ongoing activity at the WIPP site for the past six years, and will continue through the life of the project. The water quality of a well is sampled while the well is continuously pumped. Serial samples of the pumped water are collected and tested for pH, Eh, temperature, specific gravity, specific conductivity, alkalinity, chlorides, divalent cations, ferrous iron, and total iron. Stabilization of serial sampling parameters determined if a representative sample is being obtained, Representative samples are sent to contract laboratories and analyzed for general chemistry, major cations and anions, and radionuclides. 13 refs., 4 figs., 1 tab

  13. Receiver subsystem analysis report (RADL Item 4-1). The 10-MWe solar thermal central-receiver pilot plant: Solar-facilities design integration

    Science.gov (United States)

    1982-04-01

    The results of thermal hydraulic, design for the stress analyses which are required to demonstrate that the receiver design for the Barstow Solar Pilot Plant satisfies the general design and performance requirements during the plant's design life are presented. Recommendations are made for receiver operation. The analyses are limited to receiver subsystem major structural parts (primary tower, receiver unit core support structure), pressure parts (absorber panels, feedwater, condensate and steam piping/components, flash tank, and steam mainfold) and shielding.

  14. Geologic mapping of the air intake shaft at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Holt, R.M.; Powers, D.W.

    1990-12-01

    The air intake shaft (AS) was geologically mapped from the surface to the Waste Isolation Pilot Plant (WIPP) facility horizon. The entire shaft section including the Mescalero Caliche, Gatuna Formation, Santa Rosa Formation, Dewey Lake Redbeds, Rustler Formation, and Salado Formation was geologically described. The air intake shaft (AS) at the Waste Isolation Pilot Plant (WIPP) site was constructed to provide a pathway for fresh air into the underground repository and maintain the desired pressure balances for proper underground ventilation. It was up-reamed to minimize construction-related damage to the wall rock. The upper portion of the shaft was lined with slip-formed concrete, while the lower part of the shaft, from approximately 903 ft below top of concrete at the surface, was unlined. As part of WIPP site characterization activities, the AS was geologically mapped. The shaft construction method, up-reaming, created a nearly ideal surface for geologic description. Small-scale textures usually best seen on slabbed core were easily distinguished on the shaft wall, while larger scale textures not generally revealed in core were well displayed. During the mapping, newly recognized textures were interpreted in order to refine depositional and post-depositional models of the units mapped. The objectives of the geologic mapping were to: (1) provide confirmation and documentation of strata overlying the WIPP facility horizon; (2) provide detailed information of the geologic conditions in strata critical to repository sealing and operations; (3) provide technical basis for field adjustments and modification of key and aquifer seal design, based upon the observed geology; (4) provide geological data for the selection of instrument borehole locations; (5) and characterize the geology at geomechanical instrument locations to assist in data interpretation. 40 refs., 27 figs., 1 tab

  15. Prospective trial of an herbal formula BYSH and Saw palmetto in patients with hormonal refractory prostate cancer: a pilot study.

    Science.gov (United States)

    Ng, Anthony C-F; Cheng, K-F; Leung, P-C

    2014-01-01

    BYSH, a herbal formula, was evaluated for efficacy and safety in a pilot study for patients with advanced hormone refractory prostate cancer (HRPC). The pilot study was designed as a single-center open-label trial. Patients with HRPC were treated with BYSH for 24 weeks. The primary end point was the changes in serum prostate-specific antigen (PSA) level. Safety parameters such as liver and renal functions were monitored during the study period. Ten patients were eligible for the study. Most of them had stable PSA levels while taking BYSH. However, at the end of the BYSH treatment, the level of PSA increased. The median survival from diagnosis of HRPC was 16.4 months. Liver and renal functions remained normal. BYSH was well tolerated and no patient reported adverse events during the study period. Although it is inappropriate to make a conclusion based on the pilot study results, the trend of improvement is obvious. Further investigations should be conducted to demonstrate its clinical benefits. We have also briefly reviewed some plant products which are patented and also available in market.

  16. Waste Isolation Pilot Plant Salt Decontamination Testing

    Energy Technology Data Exchange (ETDEWEB)

    Rick Demmer; Stephen Reese

    2014-09-01

    On February 14, 2014, americium and plutonium contamination was released in the Waste Isolation Pilot Plant (WIPP) salt caverns. At the request of WIPP’s operations contractor, Idaho National Laboratory (INL) personnel developed several methods of decontaminating WIPP salt, using surrogate contaminants and also americium (241Am). The effectiveness of the methods is evaluated qualitatively, and to the extent possible, quantitatively. One of the requirements of this effort was delivering initial results and recommendations within a few weeks. That requirement, in combination with the limited scope of the project, made in-depth analysis impractical in some instances. Of the methods tested (dry brushing, vacuum cleaning, water washing, strippable coatings, and mechanical grinding), the most practical seems to be water washing. Effectiveness is very high, and it is very easy and rapid to deploy. The amount of wastewater produced (2 L/m2) would be substantial and may not be easy to manage, but the method is the clear winner from a usability perspective. Removable surface contamination levels (smear results) from the strippable coating and water washing coupons found no residual removable contamination. Thus, whatever is left is likely adhered to (or trapped within) the salt. The other option that shows promise is the use of a fixative barrier. Bartlett Nuclear, Inc.’s Polymeric Barrier System (PBS) proved the most durable of the coatings tested. The coatings were not tested for contaminant entrapment, only for coating integrity and durability.

  17. Pilot plant experiments for the sprout inhibition of onions by ionizing radiation

    International Nuclear Information System (INIS)

    Kalman, B.; Kiss, I.; Farkas, J.

    1978-01-01

    Experiments have been carried out with varieties grown from seed and sown onions, the former playing a decisive role in the onion production in Hungary. The results of pilot plant experiments proved the favourable and at the same time loss-decreasing effect of irradiation. During drying of onions treated and stored on large scale the yield-increasing effect of irradiation has been proved. In case of varieties grown from sown onions the saving of raw materials was almost 24 and 7%, respectively. In case of varieties grown from seed onions the yield-increase due to irradiation could not be observed each year. The decisive advantage of radiation treatment is direct yield-increase. However, the investigations of dried onions proved that the characteristics of the still not visible sprouts were affected favourably by irradiation, too. The consumer response to the irradiated onions has been favourable for several years. Though the consumers had a free choice, they distinctly insisted on buying irradiated onions on the basis of their favourable experience in using such onions. In order to utilize the results, an equipment has been designed for the economic operation of the onion-irradiating plants. (P.J.)

  18. The effect of stratigraphic dip on brine inflow and gas migration at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Webb, S.W.; Larson, K.W.

    1996-02-01

    The natural dip of the Salado Formation at the Waste Isolation Pilot Plant (WIPP), although regionally only about 111, has the potential to affect brine inflow and gas-migration distances due to buoyancy forces. Current models, including those in WIPP Performance Assessment calculations, assume a perfectly horizontal repository and stratigraphy. With the addition of buoyancy forces due to the dip, brine and gas flow patterns can be affected. Brine inflow may increase due to countercurrent flow, and gas may preferentially migrate up dip. This scoping study has used analytical and numerical modeling to evaluate the impact of the dip on brine inflow and gas-migration distances at the WIPP in one, two, and three dimensions. Sensitivities to interbed permeabilities, two-phase curves, gas-generation rates, and interbed fracturing were studied

  19. The effect of stratigraphic dip on brine inflow and gas migration at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Webb, S.W. [Sandia National Labs., Albuquerque, NM (United States); Larson, K.W. [INTERA, Inc., Albuquerque, NM (United States)

    1996-02-01

    The natural dip of the Salado Formation at the Waste Isolation Pilot Plant (WIPP), although regionally only about 111, has the potential to affect brine inflow and gas-migration distances due to buoyancy forces. Current models, including those in WIPP Performance Assessment calculations, assume a perfectly horizontal repository and stratigraphy. With the addition of buoyancy forces due to the dip, brine and gas flow patterns can be affected. Brine inflow may increase due to countercurrent flow, and gas may preferentially migrate up dip. This scoping study has used analytical and numerical modeling to evaluate the impact of the dip on brine inflow and gas-migration distances at the WIPP in one, two, and three dimensions. Sensitivities to interbed permeabilities, two-phase curves, gas-generation rates, and interbed fracturing were studied.

  20. Experience with a pilot plant for the irradiation of sewage sludge; bacteriological and parasitological studies after irradiation

    International Nuclear Information System (INIS)

    Wizigmann, I.

    1976-01-01

    Reduction of viable micro-organisms could be achieved by irradiation of sewage sludge in a pilot plant ( 60 Co gamma-radiation 300 krad, 300 min.). The reduction amounted to an average of 2 log with Enterococces and total bacterial count and to 5 log with Enterobacteriaceae. Out of 23 sludge batches from digestor II, 21 were free of Salmonella after irradiation. Of 7 sludge batches from digester I with higher level of Enterobacteriaceae and Salmonellae 5 batches still contained Salmonella after treatment. By making some alterations in the pipe system and reloading futher Cobalt 60-sources the duration of irradiation could be reduced to 65 min. while maintaining the dose level of 300 krad. Employing this altered procedure 16 batches from digestor II and 4 from digestor I were irradiated to date. Only in one of 60 samples was Salmonella detectable. The hygenic effects of the irradiation unit were confirmed by means of a model experiment with bacterial pure cultures. Microorganisms of different species as well as strains of the same species differ in their radiation-sensitivity. Parasitological experiments were conducted with Ascaris suum ova. No embryonation was noted after radiation treatment at a dose of 300 krad. (author)

  1. The creation of a uranium oxide industry, from the laboratory stage to a pilot plant (1961)

    International Nuclear Information System (INIS)

    Caillat, R.; Delange, M.; Sauteron, J.

    1961-01-01

    The qualities of uranium oxide, in particular its good in-pile characteristics and its resistance to corrosion by the usual heat-exchange fluids, have led to this material being chose at the present time as a nuclear fuel in many power reactors, either planned or under construction. A great effort has been made these last few years in France in studying processes for transforming powdered uranium oxide into a dense material with satisfactory behaviour in a neutron flux. The laboratories at Saclay have studied the physico-chemical features of the phenomena accompanying the calcination of uranium peroxide or ammonium uranate to give uranium trioxide, and the subsequent reduction of the latter to dioxide as well as the sintering of the powders obtained. This work has made it possible on one hand to prepare powder of known specific surface area, and on the other to show the overriding influence of this factor, all other things being equal, on the behaviour of powders during sintering in a hydrogen atmosphere. The work has led to defining two methods for sintering stoichiometric uranium oxide of high density. The technological study of the preparation of the powder and its industrial production are carried out at the plant of Le Bouchet which produces at the moment powders of known characteristics suitable for sintering in hydrogen at 1650 deg. C without prior grinding. The industrial sintering is carried out by the Compagnie industrielle des Combustibles Atomiques Frittes who has set up a pilot plant having a capacity of 25 metric tons/year, for the Commissariat l'Energie Atomique and has been operating this plant since May 1958. This plant is presented by a film entitled 'uranium oxide'. (author) [fr

  2. The design of a modular pilot plant based on the adsorber loop concept

    International Nuclear Information System (INIS)

    Koske, P.H.; Ohlrogge, K.

    1984-01-01

    The main design criteria for a pilot plant producing about 100 t uranium per year from seawater are discussed. The application of the adsorber loop concept for the contact between seawater and the adsorber granulate enables the employment of considerably higher seawater velocities in the adsorber bed in comparison with a fluidized bed thus reducing the necessary bed area. The seawater flow is accomplished by active pumping and the plant is supposed to be operating far from shores on high seas in tropical or subtropical waters. For this range of operation an ordinary ships hull is preferred for the basic structure to some new more sophisticated but unproven design. Depending on the effective flow rate in the adsorption units one or a few ships with standard dimensions (i.e. large container ships of about 50000 BRT; 290 m length; 40 m width) are able to produce the intended amount of 100 tU per year. Besides some information on the theoretical background the essential engineering considerations are presented. (author)

  3. Sunshine Program for fiscal 1979. Designs and drawings for tower concentration type solar thermal electric power generation pilot plant construction (Volume 1 of 2); 1979 nendo taiyonetsu hatsuden (tower shuko hoshiki) pilot plant no seisaku sekkei. Sekkei tosho (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    The pilot plant outputs 1000kWe. Under an automated operation program, 2 operators per shift take care of the whole plant (with one operator on patrol). Daily startup and stop is automatic in principle. The system stops its operation in principle when the computer is down, with accessories to be manually stopped. Warnings are dealt with all by the computer. A safety sequence is organized independent from the computer. The operators interfere with the system for the manipulation of subsystems and adjustment functions. With the plant in normal operation, the computer system logs data, monitors warnings, and the plant is under control of an analog control unit. For the activation of the automatic startup/stop function, the operators have to choose a mode of operation. The above-named document covers, furthermore, the data processing function of the automatic operating system, automatic startup/stop program, hardware, automatic startup/stop table, and a general flow chart describing the automatic startup/stop train. (NEDO)

  4. Managing ethical issues in sexual violence research using a pilot study

    Directory of Open Access Journals (Sweden)

    S.E. Duma

    2009-09-01

    Full Text Available Conducting research in the area of sexual violence has complex ethical and practical challenges for the researcher. Managing ethical issues in sexual violence is important and can be achieved through the use of pilot studies. The primary purpose of the pilot study was to identify and manage potential ethical and practical problems that could jeopardise the main study or violate the ethical and human rights of participants in the main study on women’s journey of recovery from sexual assault. The secondary purpose was to collect preliminary data in order to determine the human, financial and time resources needed for a planned study. The methods and processes used in conducting the pilot study in the study on women’s journey of recovery are discussed according to each of the objectives of the pilot study, methods used to achieve the objective, observations or findings made during the pilot study, and implications for the main study. This article aims to demonstrate how a pilot study was used to manage identified potential ethical and practical research issues during the recruitment of participants and data collection for the research that was conducted by the first author to investigate women’s journey of recovery from sexual assault trauma within the first week following sexual assault.

  5. Liverpool Telecare Pilot: case studies

    Directory of Open Access Journals (Sweden)

    Nigel Barnes

    2006-09-01

    Full Text Available Telecare services use information and communications technology (ICT to support the provision of care to people in their own homes. This paper describes a pilot telecare service employed by Liverpool (UK City Council to support a sample of their frail and elderly social services users. The pilot has been running for over two years and has been deployed for 21 individuals in Liverpool. In this paper we present the pilot system and provide real example cases which help to illustrate the benefits of such a system.

  6. Mechanical and Instrumental Experiences from the Erection, Commissioning, and Operation of a Small Pilot Plant for Development Work on Aqueous Reprocessing of Nuclear Fuels

    International Nuclear Information System (INIS)

    Joensson, K.

    1965-05-01

    A radio chemical pilot plant for the reprocessing of irradiated nuclear fuels has been built by AB Atomenergi at Kjeller in Norway. In the report a short description of the main equipment is given as well as of the procedure during the erection of the plant. Finally the results and experiences from the cold tests, tracer tests and active runs are indicated

  7. Mechanical and Instrumental Experiences from the Erection, Commissioning, and Operation of a Small Pilot Plant for Development Work on Aqueous Reprocessing of Nuclear Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Joensson, K

    1965-05-15

    A radio chemical pilot plant for the reprocessing of irradiated nuclear fuels has been built by AB Atomenergi at Kjeller in Norway. In the report a short description of the main equipment is given as well as of the procedure during the erection of the plant. Finally the results and experiences from the cold tests, tracer tests and active runs are indicated.

  8. Pilot Control of Viscous Bulking in the Activated Sludge Treatment of Industrial Effluent from Soft Drink Plants

    Directory of Open Access Journals (Sweden)

    Mohammad Mehdi Esfahani

    2007-06-01

    Full Text Available Viscous bulking is a typical problem arising in activated sludge facilities treating effluent from soft drink plants. The drawbacks associated with this phenomenon include increased effluent organic loading and undesirable sludge settlement. In order to investigate this phenomenon, a soft drink factory was selected as a pilot plant for a case study (where metal tanks were used as a biological selector, an aeration basin, and a clarifier. The study shows that the major causes of viscous bulking are high organic loading and undesirable ratio of monovalent to divalent cations. In the biological selector (with a retention time of 20 hours, while the organic load in the influent to the aeration basin decreased by about 50%, with an impact on reduced viscous bulking, pH value decreased from 12 to 6.5 due to fatty acids production. Adjustment of Na/Ca ratio improved bacterial surface hydrophobicity and prevented degradation of biological flocs. This resulted in improved sludge settleability. Application of this method improved sludge settling, made flocs stronger, and reduced effluent organic load (COD to less than 150 mg/l, indicating stability of the system.

  9. Waste Isolation Pilot Plant RH TRU waste preoperational checkout: Final report

    International Nuclear Information System (INIS)

    1988-06-01

    This report documents the results of the Waste Isolation Pilot Plant (WIPP) Remote-Handled Transuranic (RH TRU) Waste Preoperational Checkout. The primary objective of this checkout was to demonstrate the process of handling RH TRU waste packages, from receipt through emplacement underground, using equipment, personnel, procedures, and methods to be used with actual waste packages. A further objective was to measure operational time lines to provide bases for confirming the WIPP design through put capability and for projecting operator radiation doses. Successful completion of this checkout is a prerequisite to the receipt of actual RH TRU waste. This checkout was witnessed in part by members of the Environmental Evaluation Group (EEG) of the state of New Mexico. Further, this report satisfies a key milestone contained in the Agreement for Consultation and Cooperation with the state of New Mexico. 4 refs., 26 figs., 4 tabs

  10. The waste isolation pilot plant: A new regulatory environment

    International Nuclear Information System (INIS)

    Frei, M.W.; Schneider, S.P.; Saris, E.C.; Austin, P.W.

    1993-01-01

    The US Department of Energy (DOE) is ready to embark on a multiyear test program, using radioactive waste, at the Waste Isolation Pilot Plant (WIPP). The WIPP is a deep geologic repository, constructed in ancient salt beds in southeastern New Mexico. It was authorized by Congress in 1979 as a research and development facility to demonstrate safe disposal of the nation's defense transuranic (TRU) waste. Nonradioactive testing in the repository has been under way for several years. The DOE is now ready to begin underground experiments at WIPP with small amounts of TRU waste. Radioactive waste testing in an actual repository environment will reduce uncertainties associated with predictions of long-term repository performance. However, the authority for DOE to begin this new phase of the test program no longer resides within the department. The WIPP is now subject to a new level of regulatory oversight by the Environmental Protection Agency (EPA) and other federal agencies, as set forth by Public Law 102-579, the WIPP Land Withdrawal Act, signed by the President on October 30, 1992. This paper discusses the act's new regulatory requirements for WIPP

  11. Radiological control in a mine with a naturally occurring radioactive material - NORM: II assessment of external exposition in a pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, W.S.; Py Junior, D.A.; Silva, A.C.A.; Garcia Filho, O., E-mail: pereiraws@gmail.com [Industrias Nucleares do Brasil (INB), Pocos de Caldas, MG (Brazil). Unidade de Tratamento de Minerio. Grupo Multidisciplinar de Radioprotecao; Kelecom, A., E-mail: akelecom@id.uff.br [Universidade Federal Fluminense (LARARA-PLS/GETA/UFF), Niteroi, RJ (Brazil). Laboratorio de Radiobiologia e Radiometria Pedro Lopes dos Santos. Grupo de Estudos em Temas Ambientais; Pereira, J.R.S., E-mail: pereirarsj@gmail.com [Universidade Federal de Alfenas (UNIFAL), Pocos de Caldas, MG (Brazil)

    2013-07-01

    In the year of 2009, a pilot plant for uranium extraction from a phosphate mine to be installed at Santa Quiteria city, Ceara state, Brazil was carried out at the Ore Treatment Unit (OTU). During the operation of the pilot plant, the monitoring of external exposure in the area used by the pilot plant was conducted. 157 measurements were taken saving the data of the exposure rate and converting them to external dose. The background (BG) of the area was measured before the beginning of the operation and was estimated as 0.340 μSv h{sup -1}; only two measurements, out of the 157, were below the BG. The dose rates varied from 0.304 μSv h{sup -1} to 0.814 μSv h{sup -1}, with an average equal to 0.544 μSv h{sup -1}. When the results were compared to the derived limit for member of the public, which is equal to μSv h{sup -1}, approximately 38 % of the results were below this limit. Approximately 50 % of the results were below 0.554 μSv h{sup -1} and approximately 95 % of the results were below 0.754 μSv h{sup -1}. By this criterion only, the area must be considered as a supervised area. In order to classify the area in definitive, the internal exposure must also be evaluated. In this installation significant internal doses are not to be expected, considering that most part of the process is conducted by a wet route, without dust or aerosol generation, that when inhaled should create internal doses. (author)

  12. Ecotoxicity assessment of artificial groundwater recharge with reclaimed water: a pilot-scale study.

    Science.gov (United States)

    Zhang, Xue; Zhao, Xuan

    2013-11-01

    A demonstration of artificial groundwater recharge with tertiary effluent was evaluated using a set of bioassays (acute toxicity to Daphnia, genotoxicity, estrogenic and antiestrogenic toxicity). Around 95 % genotoxicity and 53 % antiestrogenicity were removed from the feed water by ozonation, whereas significant reduction of acute toxicity to Daphnia magna was achieved during a 3 days vadose soil treatment. The toxicity was further removed to the same level as the local groundwater during a 20 days aquifer soil treatment. The pilot study has shown that ozonation and soil treatments can improve the quality of municipal wastewater treatment plant effluents for possible groundwater recharge purposes.

  13. Report on the achievements in the projects subsidized by the Sunshine Project in fiscal 1981. Data 2. Development of a coal liquefaction technology - development of a solvent extraction and liquefaction technology - 'development of a brown coal based solvent extraction plant' (Development of a 50-t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 2). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Developmental researches were carried out on a liquefaction plant for the Victoria brown coal produced in Australia (a 50-t/d pilot plant). In fiscal 1981, detailed design was performed on the primary hydrogenation system by using the process conception and the design data obtained in the element studies. Part of the devices was procured, and the site construction was begun. The present data is a collection of drawings in relation with the machine design, such as the piping specifications, standard piping drawings, piping design procedures, piping drawings, pipe lists, and device inspection specifications. In relation with the instrumentation design, the instrumentation engineering specifications and meter lists. (NEDO)

  14. The ten stages pilot plant: its utilization in the research of the dynamic behavior and regullating process of a jet nozzle cascade for uranium enrichment

    International Nuclear Information System (INIS)

    Yadoya, R.; Camara, A.S.; Consiglio, R.V.; Bley, P.; Hein, H.; Linder, G.

    1986-01-01

    A ten stage pilot plant to study experimentally dynamic behavior of a uranium enrichment plant based on separation nozzle process was developed and constructed at Karlsruhe Nuclear Research Center. This installation was transfered to the Development Center of Nuclear Technology (CDTN) of Nuclebras in Belo Horizonte, Brazil. The separation elements installed have a new design with higher efficiency, Known as double-deflections system. The power plant has been used to improve the control method and to prove the stability of separation nozzle cascade under pertubations produced artificially. The stabilization process of UF 6 quantity in cascade by UF 6 inventory regulation at bottom stage will have practication in the First Cascade, in Rezende, RJ, Brazil and may be uded i emonstration plant. The experimental results have shown to be comparable with those obtained by computer simulation. (Author) [pt

  15. Carbon dioxide cleaning pilot project

    International Nuclear Information System (INIS)

    Knight, L.; Blackman, T.E.

    1994-01-01

    In 1989, radioactive-contaminated metal at the Rocky Flats Plant (RFP) was cleaned using a solvent paint stripper (Methylene chloride). One-third of the radioactive material was able to be recycled; two-thirds went to the scrap pile as low-level mixed waste. In addition, waste solvent solutions also required disposal. Not only was this an inefficient process, it was later prohibited by the Resource Conservation and Recovery Act (RCRA), 40 CFR 268. A better way of doing business was needed. In the search for a solution to this situation, it was decided to study the advantages of using a new technology - pelletized carbon dioxide cleaning. A proof of principle demonstration occurred in December 1990 to test whether such a system could clean radioactive-contaminated metal. The proof of principle demonstration was expanded in June 1992 with a pilot project. The purpose of the pilot project was three fold: (1) to clean metal so that it can satisfy free release criteria for residual radioactive contamination at the Rocky Flats Plant (RFP); (2) to compare two different carbon dioxide cleaning systems; and (3) to determine the cost-effectiveness of decontamination process in a production situation and compare the cost of shipping the metal off site for waste disposal. The pilot project was completed in August 1993. The results of the pilot project were: (1) 90% of those items which were decontaminated, successfully met the free release criteria , (2) the Alpheus Model 250 was selected to be used on plantsite and (3) the break even cost of decontaminating the metal vs shipping the contaminated material offsite for disposal was a cleaning rate of 90 pounds per hour, which was easily achieved

  16. Marine biomass power plant using methane fermentation

    Energy Technology Data Exchange (ETDEWEB)

    Matsui, T.; Saito, H.; Amano, T.; Sugawara, H.; Seki, T.; Abe, T. [Technology Research Inst., Tokyo Gas Co. Ltd., Tokyo (Japan)

    2004-07-01

    This study presented an effective way to produce biogas from the large quantities of seaweed waste in Japan. A large-scale marine biomass pilot plant was built to produce biogas from marine biomass. Methane fermentation was the process used to produce biogas from Laminaria sp. The maximum treating capacity of the pilot plant is 1 ton of seaweed per day. The pilot plant includes a pretreatment facility, fermentation, biogas storage and power generation. The maximum methane yield from the biomass plant is 22 cubic ton-seaweed. The purified biogas has generated 10 kW of electricity and 23 kW of heat. The biogas was also mixed with natural gas for use in a gas engine generator. The engine operation remained stable despite changes in quantity and composition of the collected biogas caused by changes with the source of biomass and sea conditions. The thermal efficiency of the gas engine running on mixed biogas and natural gas was more than 10 per cent higher than an engine running on biogas fuel alone. 4 refs., 2 tabs., 3 figs.

  17. Pilot non dialysis chronic renal insufficiency study (P-ND-CRIS): a pilot study of an open prospective hospital-based French cohort.

    Science.gov (United States)

    Massol, Jacques; Janin, Gérard; Bachot, Camille; Gousset, Christophe; Deville, Geoffroy Sainte-Claire; Chalopin, Jean-Marc

    2017-02-01

    Before establishing a prospective cohort, an initial pilot study is recommended. However, there are no precise guidelines on this subject. This paper reports the findings of a French regional pilot study carried out in three nephrology departments, before realizing a major prospective Non Dialysis Chronic Renal Insufficiency study (ND-CRIS). We carried out an internal pilot study. The objectives of this pilot study were to validate the feasibility (regulatory approval, providing patients with information, availability of variables, refusal rate of eligible patients) and quality criteria (missing data, rate of patients lost to follow-up, characteristics of the patients included and non-included eligible patients, quality control of the data gathered) and estimate the human resources necessary (number of clinical research associates required). The authorizations obtained (CCTIRS - CNIL) and the contracts signed with hospitals have fulfilled the regulatory requirements. After validating the information on the study provided to patients, 1849 of them were included in three centres (university hospital, intercommunal hospital, town hospital) between April 2012 and September 2015. The low refusal rate (51 patients) and the characteristics of non-included patients have confirmed the benefit for patients of participating in the study and provide evidence of the feasibility and representativeness of the population studied. The lack of missing data on the variables studied, the quality of the data analyzed and the low number of patients lost to follow-up are evidence of the quality of the study. By taking into account the time spent by CRAs to enter data and to travel, as well as the annual patient numbers in each hospital, we estimate that five CRAs will be required in total. With no specific guidelines on how to realize a pilot study before implementing a major prospective cohort, we considered it pertinent to report our experience of P-ND-CRIS. This experience confirms

  18. Pilot-plant cultivation of Streptomyces griseus producing homologues of nonactin by precursor-directed biosynthesis and their identification by LC/MS-ESI

    Czech Academy of Sciences Publication Activity Database

    Řezanka, Tomáš; Prell, Aleš; Spížek, Jaroslav; Sigler, Karel

    2010-01-01

    Roč. 63, č. 8 (2010), s. 524-529 ISSN 0021-8820 R&D Projects: GA MŠk 1M06011 Institutional research plan: CEZ:AV0Z50200510 Keywords : liquid chromatography/MS-ESI * pilot-plant cultivation * precursor-directed biosynthesis Subject RIV: EE - Microbiology, Virology Impact factor: 1.628, year: 2010

  19. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Photographs and drawings were edited into a book in relation with a joint project for environment preservation technologies in high-efficiency extraction and treatment of mineral resources, and detail design for a pilot plant. The book classified the related devices into fabricated devices, purchased devices and electrical devices, and contains detailed drawings and photographs thereof. (NEDO)

  20. The starting up of a pilot plant for radioactive incinerator ash conditioning - results of two embedding campaigns

    International Nuclear Information System (INIS)

    Kertesz, C.J.; Chenavas, P.R.; Naud, G.M.

    1990-01-01

    A new pilot plant called 'PICC' designed for radioactive incinerator ash conditioning, by embedding in several matrices, was launched at the Nuclear Research Centre in Cadarache - France - in the middle of 1988. This polyvalent facility can work with the three following embedding products = cement, thermosetting epoxide resin and an epoxide-cement compound. The capacity per day of the plant is two 100 or 200 I drums of solidified ash form. Two embedding campaigns have been carried out on inactive ashes: the first is a cementation campaign, done on phosphated ash coming from incineration of spent tributylphosphate. The second is a polymer cement campaign done on simulated alpha ash coming from technological wastes. Description of the PICC and data on these two campaigns are given