WorldWideScience

Sample records for pikeminnow management program

  1. Report on the Predation Index, Predator Control Fisheries, and Program Evaluation for the Columbia River Basin Experimental Northern Pikeminnow Management Program, 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell [Pacific States Marine Fisheries Commission].

    2009-09-10

    This report presents results for year seventeen in the basin-wide Experimental Northern Pikeminnow Management Program to harvest northern pikeminnow1 (Ptychocheilus oregonensis) in the Columbia and Snake Rivers. This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991 - a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and dam-angling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional

  2. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Glaser, Bryce G.; Amren, Jennifer

    2003-03-01

    This report presents results for year ten in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  3. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2004-01-01

    This report presents results for year twelve in a basin-wide program to harvest northern pikeminnow1 (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  4. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2003-03-01

    This report presents results for year eleven in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible.

  5. Development of a System-wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Young, Franklin R.; Wachtel, Mark L.; Petersen, Marc R.

    2003-03-01

    We are reporting on the progress of the Northern Pikeminnow Sport-Reward Fishery (NPSRF) in the lower Columbia and Snake rivers for 1998. The objectives of this project were to (1) implement a sport fishery that rewards anglers who harvest northern pikeminnow Ptychocheilus oregonensis {ge}279 mm (11 inches) total length, (2) collect catch data on selected fish species caught by fishery participants while targeting northern pikeminnow, (3) monitor and report incidental catch of sensitive salmonid species by anglers targeting northern pikeminnow and, (4) collect, monitor and report data on angler participation, catch and catch per angler day of northern pikeminnow during the season. A total of 108,903 northern pikeminnow {ge}279 mm were harvested during the 1998 season and 21,959 angler days were spent harvesting these fish. Harvest was below the seven year average of 150,874 and participation was well below the seven-year average of 51,013 angler days. Catch per angler day for all anglers during the season was 4.96 and exceeded the seven-year average of 2.96 northern pikeminnow per angler day. Peamouth Mylocheilus caurinus, and white sturgeon Acipencer transmontanus, were the other species most often harvested by returning NPSRF anglers targeting northern pikeminnow. Harvest of salmonids Oncorhynchus spp. by NPSRF anglers targeting northern pikeminnow remained below limits established by the National Marine Fisheries Service (NMFS).

  6. Diel and seasonal movements by adult Sacramento pikeminnow (Ptychocheilus grandis) in the Eel River, northwestern California

    Science.gov (United States)

    Bret C. Harvey; Rodney J. Nakamoto

    1999-01-01

    Abstract - In late summer and fall, radio-tagged adult Sacramento pike-minnow (Ptychocheilus grandis) at three sites in the Eel River of northwestern California moved more at night than during the day. Fish moved up to 535 m at night and returned to their original positions the following morning. Adult Sacramento pikeminnow at all sites occupied only pools during the...

  7. Compensatory Feeding Following a Predator Removal Program : Detection and Mechanisms, 1982-1996 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, James H.

    2002-02-28

    Predator removal is one of the oldest management tools in existence, with evidence that ancient Greeks used a bounty reward for wolves over 3,000 years ago (Anonymous 1964). Efforts to control predators on fish have been documented in scientific journals for at least 60 years (Eschmeyer 1937; Lagler 1939; Foerster and Ricker 1941; Smith and Swingle 1941; Jeppson and Platts 1959), and has likely been attempted for much longer. Complete eradication of a target species from a body of water has rarely been the objective of predator removal programs, which instead have attempted to eliminate predators from specific areas, to reduce the density or standing stock of predators, or to kill the largest individuals in the population (Meronek et al. 1996). In evaluating management programs that remove only part of a predator population, the compensatory response(s) of the remaining predators must be considered. Some potential compensatory responses by remaining individuals include increased reproductive output, increased growth rate, or increased consumption of certain prey species (Jude et al. 1987). If compensation by predators that remain in the system following a removal effort occurs, it may reduce the effectiveness of the predator control program. Northern pike-minnow Ptychocheilus oregonensis (formerly called northern squawfish) consume juvenile salmon in rivers, lakes, and reservoirs in British Columbia, Washington, Idaho, Oregon, and California. Northern pikeminnow have been estimated to consume about 11% of all juvenile salmon that migrate through John Day Reservoir on the Columbia River (Rieman et al. 1991). Modeling studies suggested that removal of 20% of the northern pikeminnow population in John Day Reservoir would result in a 50% decrease in predation-related mortality of juvenile salmon migrating through this reach (Beamesderfer et al. 1991). Since the early 1940's, other programs have been implemented to remove northern pikeminnow, with hopes of

  8. Local-scale invasion pathways and small founder numbers in introduced Sacramento pikeminnow (Ptychocheilus grandis)

    Science.gov (United States)

    Andrew P. Kinziger; Rodney J. Nakamoto; Bret C. Harvey

    2014-01-01

    Given the general pattern of invasions with severe ecological consequences commonly resulting from multiple introductions of large numbers of individuals on the intercontinental scale, we explored an example of a highly successful, ecologically significant invader introduced over a short distance, possibly via minimal propagule pressure. The Sacramento pikeminnow (

  9. Tribal Waste Management Program

    Science.gov (United States)

    The EPA’s Tribal Waste Management Program encourages environmentally sound waste management practices that promote resource conservation through recycling, recovery, reduction, clean up, and elimination of waste.

  10. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  11. French plutonium management program

    International Nuclear Information System (INIS)

    Greneche, D.

    2002-01-01

    The French plutonium management program is summarized in this paper. The program considers nuclear generation as a major component of national electric power supply and includes the reprocessing of the spent fuel. (author)

  12. Unstable slope management program.

    Science.gov (United States)

    2009-08-01

    This Rapid Response Project gathered information on existing unstable slope management programs, with a : focus on asset management practices in the United States and overseas. On the basis of this study, the research : team summarized and recommende...

  13. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  14. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  15. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  16. Knowledge management program

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, T. [CANDU Owners' Group, Toronto, Ontario (Canada)

    2013-07-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  17. Knowledge management program

    International Nuclear Information System (INIS)

    Henderson, T.

    2013-01-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  18. Managing a Behavioral Management Program

    DEFF Research Database (Denmark)

    Schapiro, Steve; Lambeth, Susan P.

    2017-01-01

    The behavioral management of captive nonhuman primates (NHPs) can be significantly enhanced through synergistic relationships with noninvasive research projects. Many behavioral and cognitive research procedures are challenging and enriching (physically, cognitively, and/or socially......) for the animals (Hopper et al. 2016; Hopkins and Latzman 2017) without involving any invasive (surgical, biopsy, etc.) procedures. Noninvasive behavioral research programs present the primates with opportunities to choose to voluntarily participate (or not), providing them with greater control over...

  19. Program Management Tool

    Science.gov (United States)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  20. The standard for program management

    CERN Document Server

    2017-01-01

    The Standard for Program Management – Fourth Edition differs from prior editions by focusing on the principles of good program management. Program activities have been realigned to program lifecycle phases rather than topics, and the first section was expanded to address the key roles of program manager, program sponsor and program management office. It has also been updated to better align with PMI’s Governance of Portfolios, Programs, and Projects: A Practice Guide.

  1. Quality Management Program

    International Nuclear Information System (INIS)

    1991-10-01

    According to section 35.32, ''Quality Management Program,'' of 10 CFR Part 35, ''Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010

  2. NPS TINYSCOPE program management

    OpenAIRE

    Turner, Christopher Gordon.

    2010-01-01

    Approved for public release; distribution is unlimited This master's thesis introduces the program management and concept of operations of the TINYSCOPE Program. TINYSCOPE is a 6U CubeSat designed as a low-cost and easily replaceable imaging spacecraft that can produce tactically relevant imagery data. Tactical requirements in this context would emphasize "good enough" image resolution with a rapid-response tasking loop and high revisit rate. The TINYSCOPE project intends to demonstra...

  3. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  4. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  5. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T.G. [U.S. Environmental Protection Agency, NC (United States); Markin, S. [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S.V. [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1995-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  6. Russia air management program

    International Nuclear Information System (INIS)

    Pace, T.G.; Markin, S.; Kosenkova, S.V.

    1995-01-01

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  7. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T G [U.S. Environmental Protection Agency, NC (United States); Markin, S [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S V [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1996-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  8. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  9. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  10. Reservoir Engineering Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Howard, J.H.; Schwarz, W.J.

    1977-12-14

    The Reservoir Engineering Management Program being conducted at Lawrence Berkeley Laboratory includes two major tasks: 1) the continuation of support to geothermal reservoir engineering related work, started under the NSF-RANN program and transferred to ERDA at the time of its formation; 2) the development and subsequent implementation of a broad plan for support of research in topics related to the exploitation of geothermal reservoirs. This plan is now known as the GREMP plan. Both the NSF-RANN legacies and GREMP are in direct support of the DOE/DGE mission in general and the goals of the Resource and Technology/Resource Exploitation and Assessment Branch in particular. These goals are to determine the magnitude and distribution of geothermal resources and reduce risk in their exploitation through improved understanding of generically different reservoir types. These goals are to be accomplished by: 1) the creation of a large data base about geothermal reservoirs, 2) improved tools and methods for gathering data on geothermal reservoirs, and 3) modeling of reservoirs and utilization options. The NSF legacies are more research and training oriented, and the GREMP is geared primarily to the practical development of the geothermal reservoirs. 2 tabs., 3 figs.

  11. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  12. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    Energy Technology Data Exchange (ETDEWEB)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  13. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    Energy Technology Data Exchange (ETDEWEB)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  14. Strategic management of population programs

    OpenAIRE

    Bernhart, Michael H.

    1992-01-01

    Formal strategic planning and management appear to contribute to organizational effectiveness. The author surveys the literature on strategic management in private/for-profit organizations and applies lessons from that literature to population programs. Few would argue that population programs would not benefit from strategic planning and management, but it would be inadvisable to initiate the process when the organization is faced with a short-term crisis; during or immediately before a chan...

  15. 14 CFR 91.1017 - Amending program manager's management specifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Amending program manager's management... Ownership Operations Program Management § 91.1017 Amending program manager's management specifications. (a... specifications; or (2) The program manager applies for the amendment of any management specifications, and the...

  16. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  17. Predation by Northern Pikeminnow and tiger muskellunge on juvenile salmonids in a high–head reservoir: Implications for anadromous fish reintroductions

    Science.gov (United States)

    Sorel, Mark H.; Hansen, Adam G.; Connelly, Kristin A.; Wilson, Andrew C.; Lowery, Erin D.; Beauchamp, David A.

    2016-01-01

    The feasibility of reintroducing anadromous salmonids into reservoirs above high-head dams is affected by the suitability of the reservoir habitat for rearing and the interactions of the resident fish with introduced fish. We evaluated the predation risk to anadromous salmonids considered for reintroduction in Merwin Reservoir on the North Fork Lewis River in Washington State for two reservoir use-scenarios: year-round rearing and smolt migration. We characterized the role of the primary predators, Northern Pikeminnow Ptychocheilus oregonensis and tiger muskellunge (Northern Pike Esox lucius × Muskellunge E. masquinongy), by using stable isotopes and stomach content analysis, quantified seasonal, per capita predation using bioenergetics modeling, and evaluated the size and age structures of the populations. We then combined these inputs to estimate predation rates of size-structured population units. Northern Pikeminnow of FL ≥ 300 mm were highly cannibalistic and exhibited modest, seasonal, per capita predation on salmonids, but they were disproportionately much less abundant than smaller, less piscivorous, conspecifics. The annual predation on kokanee Oncorhynchus nerka (in biomass) by a size-structured unit of 1,000 Northern Pikeminnow having a FL ≥ 300 mm was analogous to 16,000–40,000 age-0 spring Chinook Salmon O. tshawytscha rearing year-round, or 400–1,000 age-1 smolts migrating April–June. The per capita consumption of salmonids by Northern Pikeminnow having a FL ≥ 200 mm was relatively low, due in large part to spatial segregation during the summer and the skewed size distribution of the predator population. Tiger muskellunge fed heavily on Northern Pikeminnow, other nonsalmonids, and minimally on salmonids. In addition to cannibalism within the Northern Pikeminnow population, predation by tiger muskellunge likely contributed to the low recruitment of larger (more piscivorous) Northern Pikeminnow, thereby decreasing the risk of predation to

  18. Environmental Management Science Program Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  19. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  20. Transit management certificate program.

    Science.gov (United States)

    2012-07-01

    TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...

  1. Federal Energy Management Program Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-05

    Brochure offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  2. Asset management program

    International Nuclear Information System (INIS)

    Wison, P.; Newman, G.

    2013-01-01

    In order to understand our assets we have been assessing the condition of the units in our nuclear power plants developing asset life management options on a component by component basis. We have concluded that with the right work and planning we will be able to manage the units in a way that balances capacity requirements over the long term and at the same time manage the demand on critical resources. Major component replacement outages include Installing/removing bulkheads, pressure tube and calandria tube replacement, feeder replacement, steam generator replacement, supporting facilities and infrastructure, reactor inspections and maintenance including tooling enhancements, additional non reactor systems inspection & testing and continued research and analysis. These plans will have to take into account cost, resource and capacity requirements.

  3. NPP Krsko Aging Management Program

    International Nuclear Information System (INIS)

    Glaser, B.; Spiler, J.

    2002-01-01

    As a part of Periodic Safety Review Program (PSR) NEK will review and perform some activities related to Equipment Qualification (EQ) and Aging Management Program (AMP). (EQ) and AMP are safety factors, which need to be assessed during PSR. The goal of PSR and AMP is to determine aging effects and give the conclusion whether the plant has been managed to control aging related degradations and that safety margins are maintained. The parallel goal is also to establish AMP for future plant operation and provide basis for possible Life Extension Program. NEK will develop NEK Aging and Life Cycle Management Program, similar by format and content to one determined by License Renewal program. The bases are in 10CFR54, and NEI 95-10 Industry Guidelines for 10 CFR 54 implementation. The process of establishment the AMP is to be done in two steps. The first step is dealing with SSC's (Systems Structures and Components) scoping and screening and identification of TLAA's (Time Limited Aging Analyses). That means, that a database of all SSC's and TLAA's will be created and then evaluated within AMP program. Based on the scope in first phase an evaluation will be performed in step two. NEK will maintain AMP program as a living program that may be also used for Life Extension and Life Cycle Management. This paper will present and describe AMP, scoping and screening process and the results achieved through the first phase of the project.(author)

  4. ERDA waste management program

    International Nuclear Information System (INIS)

    Kuhlman, C.W.

    1976-01-01

    The ERDA commercial waste program is summarized. It consists of three parts: terminal storage, processing, and preparation of the Generic Environmental Impact Statement. Emplacement in geologic formations is the best disposal method for high-level waste; migration would be essentially zero, as it was in the Oklo event. Solidification processes are needed. Relations with the states, etc. are touched upon

  5. Aircrew team management program

    Science.gov (United States)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  6. A Program Management Framework for Facilities Managers

    Science.gov (United States)

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  7. Establishments of scientific radiation protection management program

    International Nuclear Information System (INIS)

    Pan Ziqiang

    1988-01-01

    Some aspects for establishing the radiation protection management program have been discussed. Radiation protection management program includes: definite aims of management, complete data register, strict supervision system, and scientific management methodology

  8. Multidisciplinary pain management programs.

    OpenAIRE

    Kaiser, Ulrike; Arnold, Bernhard; Pfingsten, Michael; Nagel, Bernd; Lutz, Johannes; Sabatowski, Rainer

    2013-01-01

    Ulrike Kaiser,1 Bernhard Arnold,2 Michael Pfingsten,3 Bernd Nagel,4 Johannes Lutz,5 Rainer Sabatowski1,61Comprehensive Pain Center, University Hospital “Carl Gustav Carus”, Dresden, 2Department of Pain Management, Klinikum Dachau, Dachau, 3Pain Clinic, University Medicine, University of Göttingen, 4Day Care Unit, DRK Pain Center, Mainz, 5Interdisciplinary Pain Center, Zentralklinik Bad Berka, Bad Berka, 6Department of Anesthesiology and Intensive Care, University ...

  9. Multidisciplinary pain management programs

    Directory of Open Access Journals (Sweden)

    Kaiser U

    2013-05-01

    Full Text Available Ulrike Kaiser,1 Bernhard Arnold,2 Michael Pfingsten,3 Bernd Nagel,4 Johannes Lutz,5 Rainer Sabatowski1,61Comprehensive Pain Center, University Hospital “Carl Gustav Carus”, Dresden, 2Department of Pain Management, Klinikum Dachau, Dachau, 3Pain Clinic, University Medicine, University of Göttingen, 4Day Care Unit, DRK Pain Center, Mainz, 5Interdisciplinary Pain Center, Zentralklinik Bad Berka, Bad Berka, 6Department of Anesthesiology and Intensive Care, University Hospital “Carl Gustav Carus”, Dresden, Germany

  10. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  11. Ageing Management Program Database

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Zabric, I.; Savli, S.

    2008-01-01

    The aspects of plant ageing management (AM) gained increasing attention over the last ten years. Numerous technical studies have been performed to study the impact of ageing mechanisms on the safe and reliable operation of nuclear power plants. National research activities have been initiated or are in progress to provide the technical basis for decision making processes. The long-term operation of nuclear power plants is influenced by economic considerations, the socio-economic environment including public acceptance, developments in research and the regulatory framework, the availability of technical infrastructure to maintain and service the systems, structures and components as well as qualified personnel. Besides national activities there are a number of international activities in particular under the umbrella of the IAEA, the OECD and the EU. The paper discusses the process, procedure and database developed for Slovenian Nuclear Safety Administration (SNSA) surveillance of ageing process of Nuclear power Plant Krsko.(author)

  12. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  13. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  14. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  15. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  16. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  17. Space program management methods and tools

    CERN Document Server

    Spagnulo, Marcello; Balduccini, Mauro; Nasini, Federico

    2013-01-01

    Beginning with the basic elements that differentiate space programs from other management challenges, Space Program Management explains through theory and example of real programs from around the world, the philosophical and technical tools needed to successfully manage large, technically complex space programs both in the government and commercial environment. Chapters address both systems and configuration management, the management of risk, estimation, measurement and control of both funding and the program schedule, and the structure of the aerospace industry worldwide.

  18. Managing a mixed waste program

    International Nuclear Information System (INIS)

    Koch, J.D.

    1994-01-01

    IT Corporation operates an analytical laboratory in St. Louis capable of analyzing environmental samples that are contaminated with both chemical and radioactive materials. Wastes generated during these analyses are hazardous in nature; some are listed wastes others exhibit characteristic hazards. When the original samples contain significant quantities of radioactive material, the waste must be treated as a mixed waste. A plan was written to document the waste management program describing the management of hazardous, radioactive and mixed wastes. This presentation summarizes the methods employed by the St. Louis facility to reduce personnel exposures to the hazardous materials, minimize the volume of mixed waste and treat the materials prior to disposal. The procedures that are used and the effectiveness of each procedure will also be discussed. Some of the lessons that have been learned while dealing with mixed wastes will be presented as well as the solutions that were applied. This program has been effective in reducing the volume of mixed waste that is generated. The management program also serves as a method to manage the costs of the waste disposal program by effectively segregating the different wastes that are generated

  19. Indoor Air Quality Management Program.

    Science.gov (United States)

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  20. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  1. Sport Management Graduate Programs: Characteristics of Effectiveness.

    Science.gov (United States)

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  2. Home audit program: management manual

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  3. 76 FR 39857 - Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under...

    Science.gov (United States)

    2011-07-07

    ... DEPARTMENT OF COMMERCE National Oceanic Atmospheric Administration Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under the Coastal Zone Management Act (CZMA) AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Ocean Service (NOS...

  4. 76 FR 74842 - RTCA Program Management Committee

    Science.gov (United States)

    2011-12-01

    ... Minimum Aviation System Performance Standards (MASPS) for Advanced VHF Digital Data Communications... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration RTCA Program Management Committee... RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public...

  5. Establishing a total information management program

    International Nuclear Information System (INIS)

    Hegstrom, K.L.; Fisher, J.

    1982-01-01

    A total information management program manages documents for easy access and identifies data elements commonly found in all documents. The program thus links disparate documents by identifying information they share in common

  6. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  7. 10 CFR 800.002 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE General § 800.002 Program management. Program management responsibility for...

  8. 30 CFR 401.12 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal year's...

  9. 20 CFR 638.800 - Program management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures sufficient...

  10. 30 CFR 402.13 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 402.13 Section 402.13... WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or...

  11. 14 CFR 1214.1706 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  12. Potential transportation demand management programs and measures

    Energy Technology Data Exchange (ETDEWEB)

    Litman, T. [Victoria Transport Policy Institute, Victoria, BC (Canada)

    1997-02-07

    The advantages of transportation demand management (TDM) programs were discussed. TDM includes several policies, programs and measures designed to change travel patterns. TDM programs include commute trip reductions, pricing policies, land use management strategies, and programs to support alternative modes of transportation such as public transit, carpooling, bicycling, walking and telecommuting. TDM programs are designed to reduce traffic congestion and air pollution. Some other TDM programs and measures include: enabling programs, alternative mode encouragement, driving disincentives, parking programs, marginalizing user costs, reducing automobile ownership, and land use management.

  13. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  14. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  15. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  16. University Program Management Information System

    Science.gov (United States)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  17. 40 CFR 130.11 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...

  18. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  19. AECL's mixed waste management program

    International Nuclear Information System (INIS)

    Peori, R.; Hulley, V.

    2006-01-01

    Every nuclear facility has it, they wish that they didn't but they have generated and do possess m ixed waste , and until now there has been no permanent disposition option; it has been for the most been simply maintained in interim storage. The nuclear industry has been responsibly developing permanent solutions for solid radioactive waste for over fifty years and for non-radioactive, chemically hazardous waste, for the last twenty years. Mixed waste (radioactive and chemically hazardous waste) however, because of its special, duo-hazard nature, has been a continuing challenge. The Hazardous Waste and Segregation Program (HW and SP) at AECL's CRL has, over the past ten years, been developing solutions to deal with their own in-house mixed waste and, as a result, have developed solutions that they would like to share with other generators within the nuclear industry. The main aim of this paper is to document and describe the early development of the solutions for both aqueous and organic liquid wastes and to advertise to other generators of this waste type how these solutions can be implemented to solve their mixed waste problems. Atomic Energy of Canada Limited (AECL) and in particular, CRL has been satisfactorily disposing of mixed waste for the last seven years. CRL has developed a program that not only disposes of mixed waste, but offers a full service mixed waste management program to customers within Canada (that could eventually include U.S. sites as well) that has developed the experience and expertise to evaluate and optimize current practices, dispose of legacy inventories, and set up an efficient segregation system to reduce and effectively manage, both the volumes and expense of, the ongoing generation of mixed waste for all generators of mixed waste. (author)

  20. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  1. Radioactive Waste Management Program Activities in Croatia

    International Nuclear Information System (INIS)

    Matanic, R.

    2000-01-01

    The concept of radioactive waste management in Croatia comprises three major areas: management of low and intermediate level radioactive waste (LILRW), spent fuel management and decommissioning. All the work regarding radioactive waste management program is coordinated by Hazardous Waste Management Agency (APO) and Croatian Power Utility (HEP) in cooperation with other relevant institutions. Since the majority of work has been done in developing low and intermediate level radioactive waste management program, the paper will focus on this part of radioactive waste management, mainly on issues of site selection and characterization, repository design, safety assessment and public acceptance. A short description of national radioactive waste management infrastructure will also be presented. (author)

  2. Disease management: findings from leading state programs.

    Science.gov (United States)

    Wheatley, Ben

    2002-12-01

    Disease management programs are designed to contain costs by improving health among the chronically ill. More than 20 states are now engaged in developing and implementing Medicaid disease management programs for their primary care case management and fee-for-service populations.

  3. Evaluating and Selecting Sport Management Undergraduate Programs.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  4. NASA and the Federal Management Intern Program.

    Science.gov (United States)

    Pound, Jack K.; Slack, Vivian M.

    A review of NASA Federal Management Intern (MI) programs indicates potential for identification, attraction, and early development of successful administrative management employees, but suggests that successful development of managers is a function of the long-term care with which an agency pursues MI programs. A recent study of separations in…

  5. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  6. Intelligence Community Programs, Management, and Enduring Issues

    Science.gov (United States)

    2016-11-08

    books, journal papers, conference presentations, working papers, and other electronic and print publications. Intelligence Community Programs... Intelligence Community Programs, Management, and Enduring Issues Anne Daugherty Miles Analyst in Intelligence and National Security Policy...

  7. Global pest management program wins international award

    OpenAIRE

    Rich, Miriam Sommers

    2009-01-01

    An agricultural research program managed at Virginia Tech has won an international award for its work with pest-management practices that show economic benefits with minimal impact on health and the environment.

  8. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  9. Tapping into the Forest Management Assistance Programs

    Science.gov (United States)

    John L. Greene; Terry K. Haines

    1998-01-01

    Use of federal and state forest management assistance programs can enable nonindustial private forest owners to reduce their management expenses and practice better stewardship. This paper summarizes six federal and twelve state assistance programs available to owners in the North Central states. It also describes how to calculate the amount of a government...

  10. Developing Program Management Leadership for Acquisition Reform

    Science.gov (United States)

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  11. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    1975-08-01

    The report describes the wide-ranging program of engineering developments and applications to provide the Canadian nuclear industry with the knowledge and expertise it needs to conduct its waste management program. The need for interim dry storage of spent fuel, and the storage and ultimate disposal of waste from fuel reprocessing are examined. The role of geologic storage in AECL's current waste management program is also considered. (R.A.)

  12. Benefits of a formal waste management program

    International Nuclear Information System (INIS)

    Wolfe, R.A.

    1974-01-01

    The proper management of waste is of vital importance in the conservation of our environment. Mound Laboratory, which is operated by Monsanto Research Corporation for the U. S. Atomic Energy Commission, has embarked upon a waste management program designed to assure that the generation, processing, storage, and disposal of waste is conducted in such a manner as to have a minimum impact on the environment. The organizational approach taken toward waste management is discussed and some of the benefits of the waste management program at Mound Laboratory are described. Ithas been shown that the utilization of proper waste management techniques can have economic, as well as environmental protection, benefits. (U.S.)

  13. Comprehensive quality management program for radiation oncology

    International Nuclear Information System (INIS)

    Dawson, J.; Roy, T.; Abrath, F.; Wu, T.; Gu, J.; McDonald, R.; Kim, H.; Haenchen, M.

    1994-01-01

    A quality management program for both external beam irradiation (electron and photon modes) and brachytherapy (high dose rate (HDR) and low dose rate (LDR) has been developed. The program follows current USA federal regulations for therapeutic administration of by-product materials. After implementation of the program, 54 HDR patients, 36 LDR brachytherapy patients and 311 external beam patients (including 30 stereotactic radiosurgery cases) were treated. The results of this program are presented

  14. Compromise Programming in forest management

    Science.gov (United States)

    Boris A. Poff; Aregai Tecle; Daniel G. Neary; Brian Geils

    2010-01-01

    Multi-objective decision-making (MODM) is an appropriate approach for evaluating a forest management scenario involving multiple interests. Today's land managers must accommodate commercial as well as non-commercial objectives that may be expressed quantitatively and/or qualitatively, and respond to social, political, economic and cultural changes. The spatial and...

  15. Program Manager’s Handbook

    Science.gov (United States)

    1989-03-01

    risk as early as cess control and process management are prin- possible and before Milestone II. Risk management ciples of the Deming philosophy for...operational concept dXcumcr t and software technical art form. The software development pro- development specifications. 4.16a Figure 1. LIFE CICLE

  16. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  17. Management practices in substance abuse treatment programs.

    Science.gov (United States)

    McConnell, K John; Hoffman, Kim A; Quanbeck, Andrew; McCarty, Dennis

    2009-07-01

    Efforts to understand how to improve the delivery of substance abuse treatment have led to a recent call for studies on the "business of addiction treatment." This study adapts an innovative survey tool to collect baseline management practice data from 147 addiction treatment programs enrolled in the Network for the Improvement of Addiction Treatment 200 project. Measures of "good" management practice were strongly associated with days to treatment admission. Management practice scores were weakly associated with revenues per employee but were not correlated with operating margins. Better management practices were more prevalent among programs with a higher number of competitors in their catchment area.

  18. Croatian radioactive waste management program: Current status

    International Nuclear Information System (INIS)

    Matanic, R.; Lebegner, J.

    2001-01-01

    Croatia has a responsibility to develop a radioactive waste management program partly due to co-ownership of Krsko nuclear power plant (Slovenia) and partly because of its own medical and industrial radioactive waste. The total amount of generated radioactive waste in Croatia is stored in temporary storages located at two national research institutes, while radioactive waste from Krsko remains in temporary storage on site. National power utility Hrvatska Elektroprivreda (HEP) and Hazardous Waste Management Agency (APO) coordinate the work regarding decommissioning, spent fuel management and low and intermediate level radioactive waste (LILRW) management in Croatia. Since the majority of work has been done in developing the LILRW management program, the paper focuses on this part of radioactive waste management. Issues of site selection, repository design, safety assessment and public acceptance are being discussed. A short description of the national radioactive waste management infrastructure has also been presented. (author)

  19. Program summary. Nuclear waste management and fuel cycle programs

    International Nuclear Information System (INIS)

    1982-07-01

    This Program Summary Document describes the US Department of Energy (DOE) Nuclear Waste Management and Fuel Cycle Programs. Particular emphasis is given to near-term, specifically Fiscal Year (FY) 1982, activities. The overall objective of these programs will be achieved by the demonstration of: (1) safe radioactive waste management practices for storage and disposal of high-level waste and (2) advanced technologies necessary to close the nuclear fuel cycle on a schedule which would assure a healthy future for the development of nuclear power in this country

  20. Low-level waste management program: technical program overview

    International Nuclear Information System (INIS)

    Lowrie, R.S.

    1981-01-01

    The mission of the technical program is to develop the technology component of the Department of Energy's Low-Level Waste Management Program and to manage research and development, demonstration, and documentation of the technical aspects of the program. Some of the major technology objectives are: develop and demonstrate techniques for waste generation reduction; develop and demonstrate waste treatment, handling and packaging techniques; develop and demonstrate the technology for greater confinement; and develop the technology for remedial action at existing sites. In addition there is the technology transfer objective which is to compile and issue a handbook documenting the technology for each of the above technology objectives

  1. Metra operations management development program : 2010 - 2015.

    Science.gov (United States)

    2016-11-04

    On behalf of the Urban Transportation Center, the University of Illinois (UIC) Great Cities Institute (GCI) provided curriculum development and training services to Metra for a workforce education program targeted to new and experienced managers. Met...

  2. Data warehousing in disease management programs.

    Science.gov (United States)

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  3. Maintenance engineering of lifetime management programs

    International Nuclear Information System (INIS)

    Hervia Ruperez, F.

    1997-01-01

    The complexity of nuclear power plants obliges to stablish the adecuated management of its lifetime. This article describes the methodologies and the improvement the evaluation of lifetime programs and specially in Garona and Vandellos II Nuclear Power Plants. (Author)

  4. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  5. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  6. Economic value evaluation in disease management programs.

    Science.gov (United States)

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  7. One System for Blood Program Information Management

    Science.gov (United States)

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  8. Environmental Management Science Program Workshop. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  9. Computer-Aided Corrosion Program Management

    Science.gov (United States)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  10. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  11. Cryogenic fluid management program flight concept definition

    Science.gov (United States)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  12. UNBC: Outdoor Recreation and Tourism Management Program

    Science.gov (United States)

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  13. The Columbia University Management Program.

    Science.gov (United States)

    Yavarkovsky, Jerome; Haas, Warren J.

    In 1971, a management consulting firm undertook a case study of the Columbia University libraries to improve library performance by reviewing and strengthening the organization and recasting staff composition and deployment patterns. To implement the study's recommendations, an administrative structure was proposed which would emphasize functional…

  14. Marketing the Masters of Executive Management program

    OpenAIRE

    Barrera, Mark A.; Karriker, Timothy W.

    2007-01-01

    MBA Professional Report The purpose of this MBA project was to review the current Masters of Executive Management education curriculum at NPS. An internal analysis of the current program was conducted to fully understand the strategic goals of the program and the existing curriculum. An environmental scan of current and potential military customers was conducted to assess requirements for junior executive education and determine whether the MEM program corresponds with these requiremen...

  15. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  16. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  17. Exploring the Application of Optical Remote Sensing as a Method to Estimate the Depth of Backwater Nursery Habitats of the Colorado Pikeminnow

    Energy Technology Data Exchange (ETDEWEB)

    Hamada, Yuki [Argonne National Lab. (ANL), Argonne, IL (United States); LaGory, Kirk E. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-02-01

    Low-velocity channel-margin habitats serve as important nursery habitats for the endangered Colorado pikeminnow (Ptychocheilus lucius) in the middle Green River between Jensen and Ouray, Utah. These habitats, known as backwaters, are associated with emergent sand bars, and are shaped and reformed annually by peak flows. A recent synthesis of information on backwater characteristics and the factors that influence inter-annual variability in those backwaters (Grippo et al. 2015) evaluated detailed survey information collected annually since 2003 on a relatively small sample of backwaters, as well as reach-wide evaluations of backwater surface area from aerial and satellite imagery. An approach is needed to bridge the gap between these detailed surveys, which estimate surface area, volume, and depth, and the reach-wide assessment of surface area to enable an assessment of the amount of habitat that meets the minimum depth requirements for suitable habitat.

  18. DOE Low-Level Waste Management Program

    International Nuclear Information System (INIS)

    Mezga, L.J.

    1983-01-01

    The Oak Ridge National Laboratory (ORNL) in its role as associate lead contractor of the DOE LLWMP has responsibility for the management of program-funded technology development activities. In this role with general guidance provided by DOE and the lead contractor (EG and G Idaho), the ORNL program office is charged with the responsibility to (1) develop program plans for the major technology areas, (2) recommend allocations for the program resources, (3) review the technology development tasks to ensure that program objectives are being met, and (4) to assist the lead contractor in coordinating the DOE LLWMP with other on-going US and foreign waste technology programs. Although the ORNL office generally assists the lead laboratory in management of the total program, our emphasis is on management of R and D for development of basic technology and to assess concepts for alternative systems of processing and disposal of LLW. Technical progress for each of the tasks of this program for FY 1982 is summarized

  19. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  20. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Rummery, T.E.; Rosinger, E.L.J.

    1983-05-01

    The Canadian Nuclear Fuel Waste Management Program is now well established. This report outlines the generic research and technological development underway in this program to assess the concept of immobilization and subsequent disposal of nuclear fuel waste deep in a stable plutonic rock in the Canadian Shield. The program participants, funding, schedule and associated external review processes are briefly outlined. The major scientific and engineering components of the program, namely, immobilization studies, geoscience research and environmental and safety assessment, are described in more detail

  1. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Rummery, T.E.; Rosinger, E.L.J.

    1984-12-01

    The Canadian Nuclear Fuel Waste Management Program is in the fourth year of a ten-year generic research and development phase. The objective of this phase of the program is to assess the basic safety and environmental aspects of the concept of isolating immobilized fuel waste by deep underground disposal in plutonic rock. The major scientific and engineering components of the program, namely immobilization studies, geoscience research, and environmental and safety assessment, are described. Program funding, scheduling and associated external review processes are briefly outlined

  2. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dixon, R.S.

    1984-12-01

    The Canadian Nuclear Fuel Waste Management Program involves research into the storage and transportation of used nuclear fuel, immobilization of fuel waste, and deep geological disposal of the immobilized waste. The program is now in the fourth year of a ten-year generic research and development phase. The objective of this phase of the program is to assess the safety and environmental aspects of the deep underground disposal of immobilized fuel waste in plutonic rock. The objectives of the research for each component of the program and the progress made to the end of 1983 are described in this report

  3. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  4. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Science.gov (United States)

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  5. Transuranic waste management program waste form development

    International Nuclear Information System (INIS)

    Bennett, W.S.; Crisler, L.R.

    1981-01-01

    To ensure that all technology necessary for long term management of transuranic (TRU) wastes is available, the Department of Energy has established the Transuranic Waste Management Program. A principal focus of the program is development of waste forms that can accommodate the very diverse TRU waste inventory and meet geologic isolation criteria. The TRU Program is following two approaches. First, decontamination processes are being developed to allow removal of sufficient surface contamination to permit management of some of the waste as low level waste. The other approach is to develop processes which will allow immobilization by encapsulation of the solids or incorporate head end processes which will make the solids compatible with more typical waste form processes. The assessment of available data indicates that dewatered concretes, synthetic basalts, and borosilicate glass waste forms appear to be viable candidates for immobilization of large fractions of the TRU waste inventory in a geologic repository

  6. The Marshall Islands Data Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  7. The Marshall Islands Data Management Program

    International Nuclear Information System (INIS)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project

  8. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  9. Hanford Site grundwater protection management program

    International Nuclear Information System (INIS)

    1989-10-01

    Groundwater protection has emerged over the past few years as a national priority that has been promulgated in a variety of environmental regulations at both the state and federal level. In order to effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy (DOE) requires all DOE facilities to prepare separate groundwater protection program descriptions and plans (groundwater activities were formerly included as a subpart of environmental protection programs). This document is for the Hanford Site located in the state of Washington. The DOE Order specifies that the groundwater protection management program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. 14 refs., 19 figs., 2 tabs

  10. Pediatric CT quality management and improvement program

    Energy Technology Data Exchange (ETDEWEB)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik [Stanford University School of Medicine, Department of Radiology, Stanford, CA (United States); Molvin, Lior Z. [Stanford Hospital and Clinics, Stanford, CA (United States); Wang, Jia [Stanford University, Environmental Health and Safety, Stanford, CA (United States)

    2014-10-15

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  11. Pediatric CT quality management and improvement program

    International Nuclear Information System (INIS)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik; Molvin, Lior Z.; Wang, Jia

    2014-01-01

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  12. Plant lifetime management and research program

    International Nuclear Information System (INIS)

    Sakai, K.; Nagayama, M.

    1993-01-01

    The importance of nuclear power generation has been increasing in Japan. Because the lower generation cost and more stable fuel supply, in comparison with the case of fossil plants, are beneficial to Japan which has scarce natural resources. In addition, nuclear power generation is expected to help reduce carbon dioxide emission which causes global warming. In these circumstances, the safe and stable operations of nuclear power plants are of prime importance, and the frequency of unscheduled shutdown has been kept low in Japan as a result of thorough periodic inspections supported by aging management. This paper covers the development process of the aging management program and related research programs in The Kansai Electric Power Co., Inc. (KEPCO). KEPCO runs 11 nuclear power units (PWR). A Table shows the commencement date of commercial operation and operating hours for each unit. The early plants, such as Mihama-2 Unit, have been operated for more than 100,000 hours and are in the phase of aging management. Accordingly, we have been conducting aging management programs since 1987. in order to identify age-related degradation and work out countermeasures.The aging management programs have ensured safe and stable operation of nuclear power plants. Each result of the lifetime assessment has provided the information which helps establishing maintenance programs. For example, the result of the lifetime assessment has been reflected to the intervals of overhaulings and inspections, and the replacement timing of some components. In the future activities of aging management should be revised and should focus lifetime assessment on components which provoke difficulties in inspections because of high radiation exposure or high inspection cost

  13. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  14. Abstracts: NRC Waste Management Program reports

    Energy Technology Data Exchange (ETDEWEB)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers.

  15. Parents are Teachers: A Child Management Program.

    Science.gov (United States)

    Becker, Wesley C.

    This manual is designed to help parents apply reinforcement theory in managing their children. The program explains how parents can systematically use consequences to teach children in positive ways. Units include: When to Reinforce; How to Reinforce; Reinforcement and Punishment in Everyday Life; and Why Parents (and Teachers) Goof; the Criticism…

  16. Abstracts: NRC Waste Management Program reports

    International Nuclear Information System (INIS)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers

  17. The Canadian fuel waste management program

    International Nuclear Information System (INIS)

    McConnell, D.B.

    1986-04-01

    This report is the sixth in the series of annual reports on the research and development program for the safe management and disposal of Canada's nuclear fuel waste. The report summarizes progress in 1984 for the following activities: storage and transportation of used fuel, immobilization of nuclear fuel waste, geotechnical research, environmental research, and environmental and safety assessment. 186 refs

  18. Cash Management Program Reaps Financial Rewards.

    Science.gov (United States)

    Saylor, Joan Nesenkar

    1984-01-01

    Basic components of a New Jersey district's profitable cash management program include consolidating funds using a negotiated bank agreement, a short term investment policy, accurate flowcharts for precise planning, and revenue and expenditure analysis. Data collection and analysis and the alternative of using a bank service agreement are…

  19. Sandia National Laboratories, California Waste Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  20. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  1. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to...

  2. The Environmental Assessment and Management (TEAM) Guide: New Mexico Supplement

    Science.gov (United States)

    2010-03-01

    dace, Phoxinus erythrogaster (j) Colorado pikeminnow, Ptychocheilus lucius (k) loach minnow, Tiaroga cobitis 5-13 Natural Resources Management...writing by the Department, off-site at a readily available location. ST.4.38.NM. Corrective actions must be ta ken u pon a release involving a...cause a public nuisance or threat to human health, safety and welfare, or the environment. Verify th at when c ontaminated s oil is ta ken o ff s ite

  3. 20 CFR 632.76 - Program management systems.

    Science.gov (United States)

    2010-04-01

    ... management and participant tracking systems in accordance with § 632.32 and § 632.77. The principal... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program...

  4. Research waste management program - An action proposal

    International Nuclear Information System (INIS)

    Costa Ramos, A.; Esposito, I.

    1997-01-01

    The Brazilian Nuclear Energy Commission planned prepared and established a Research Waste Management Program, started in 1996, in order to map, to analyze and to solve the common problems in the research field. The specific study done included a large number of academic institutions. The procedures, results and operational methodology used by the Team linked to the Program, in one of the research institutions studied where corrective actions were implemented to avoid unnecessary dose to the public, will be discussed in this article. (author)

  5. 76 FR 34541 - Child and Adult Care Food Program Improving Management and Program Integrity

    Science.gov (United States)

    2011-06-13

    ... 7 CFR Parts 210, 215, 220 et al. Child and Adult Care Food Program Improving Management and Program..., 220, 225, and 226 RIN 0584-AC24 Child and Adult Care Food Program Improving Management and Program... management and integrity in the Child and Adult Care Food Program (CACFP), at 67 FR 43447 (June 27, 2002) and...

  6. Health risk assessment for program managers

    International Nuclear Information System (INIS)

    Jump, R.A.; Williamson, D.S.

    1994-01-01

    This paper presents the findings of a sensitivity analysis into the independent variables that determine the levels of health risks posed by buried plutonium and americium at a typical contaminated site in an arid region. Environmental Restoration Program Managers often must make decisions concerning cleanup levels, remediation alternatives, schedules, cost estimates, etc. based upon extraordinarily safe assumptions about risk assessment calculation inputs. This study reveals to the Program Manager which variables are major drivers to the calculated levels of risk posed by transuranic radionuclides and which ones have second order effects or less. The findings of this study should indicate which inputs should be the focus of attention during negotiations with regulators and of further empirical investigation

  7. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dixon, R.S.; Rosinger, E.L.J.

    1984-04-01

    This report, the fifth of a series of annual reports, reviews the progress that has been made in the research and development program for the safe management and disposal of Canada's nuclear fuel waste. The report summarizes activities over the past year in the following areas: public interaction; used fuel storage and transportation; immobilization of used fuel and fuel recycle waste; geoscience research related to deep underground disposal; environmental research; and environmental and safety assessment

  8. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    The objectives of the Canadian radioactive waste management program are described. Recycling actinides through reactors is being studied. Low and medium level waste treatments such as reverse osmosis concentration, immobilization in bitumen and plastics, and incineration are under study. Spent fuel can be stored dry in concrete canisters above ground and ultimate storage of wastes in salt deposits or hard rock is appropriate to Canadian conditions. (E.C.B.)

  9. 1998 Environmental Management Science Program Annual Report

    International Nuclear Information System (INIS)

    1999-01-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders

  10. Transuranic waste management program and facilities

    International Nuclear Information System (INIS)

    Clements, T.L. Jr.; Cook, L.A.; Stallman, R.M.; Hunter, E.K.

    1986-01-01

    Since 1954, defense-generated transuranic (TRU) waste has been received at the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). Prior to 1970, approximately 2.2 million cubic feet of transuranic waste were buried in shallow-land trenches and pits at the RWMC. Since 1970, an additional 2.1 million cubic feet of waste have been retrievably stored in aboveground engineered confinement. A major objective of the Department of Energy (DOE) Nuclear Waste Management Program is the proper management of defense-generated transuranic waste. Strategies have been developed for managing INEL stored and buried transuranic waste. These strategies have been incorporated in the Defense Waste Management Plan and are currently being implemented with logistical coordination of transportation systems and schedules for the Waste Isolation Pilot Plant (WIPP). The Stored Waste Examination Pilot Plant (SWEPP) is providing nondestructive examination and assay of retrievably stored, contact-handled TRU waste. Construction of the Process Experimental Pilot Plant (PREPP) was recently completed, and PREPP is currently undergoing system checkout. The PRFPP will provide processing capabilities for contact-handled waste not meeting WIPP-Waste Acceptance Criteria (WAC). In addition, ongoing studies and technology development efforts for managing the TRU waste such as remote-handled and buried TRU waste, are being conducted

  11. Transuranic Waste Management Program and Facilities

    International Nuclear Information System (INIS)

    Clements, T.L. Jr.; Cook, L.A.; Stallman, R.M.; Hunter, E.K.

    1986-02-01

    Since 1954, defense-generated transuranic (TRU) waste has been received at the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). Prior to 1970, approximately 2.2 million cubic feet of transuranic waste were buried in shallow-land trenches and pits at the RWMC. Since 1970, an additional 2.1 million cubic feet of waste have been retrievably stored in aboveground engineered confinement. A major objective of the Department of Energy (DOE) Nuclear Waste Management Program is the proper management of defense-generated transuranic waste. Strategies have been developed for managing INEL stored and buried transuranic waste. These strategies have been incorporated in the Defense Waste Management Plan and are currently being implemented with logistical coordination of transportation systems and schedules for the Waste Isolation Pilot Plant (WIPP). The Stored Waste Examination Pilot Plant (SWEPP) is providing nondestructive examination and assay of retrievably stored, contact-handled TRU waste. Construction of the Process Experimental Pilot Plant (PREPP) was recently completed, and PREPP is currently undergoing system checkout. The PREPP will provide processing capabilities for contact-handled waste not meeting WIPP-Waste Acceptance Criteria (WAC). In addition, ongoing studies and technology development efforts for managing the TRU waste such as remote-handled and buried TRU waste, are being conducted

  12. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  13. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  14. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  15. University Program Management Information System: NASA's University Program Active Projects

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  16. Program Management Challenges in a Joint Service Environment

    National Research Council Canada - National Science Library

    Taneyhill, Dorothy E

    2007-01-01

    ... or modifications of the same design. The Interim Defense Acquisition Guidebook defines a Joint Program Management Office as any defense acquisition system, subsystem, component, or technology program that involves formal management...

  17. NASA University Program Management Information System

    Science.gov (United States)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  18. Using information management to implement a clinical resource management program.

    Science.gov (United States)

    Rosenstein, A H

    1997-12-01

    This article provides a consultant's account of a 250-bed community hospital's experience in implementing the Clinical Resource Management (CRM) program, a four-stage process of using information to identify opportunities for improvement, developing an effective resource management team, implementing process improvement activities, and measuring the impact on outcomes of care. CASE STUDY EXAMPLE--CONGESTIVE HEART FAILURE: The chair of the departments of internal medicine and family practice selected congestive heart failure for in-depth study. A task force focused on treatment and patient disposition in the emergency room (ER), where most of the nonelective admissions originated. A set of standardized ER orders was developed that emphasized rapid and effective diuresis through the initiation of a progressive diuretic dosing schedule directly linked to patient response. Factors critical to the success of the CRM program included allocating adequate time to promote and sell the value and importance of the program, as well as securing the support of both information systems and physicians. The main barriers to success involved limitations in the information system infrastructure and delays attributable to committee review. Short-term results from the CRM program were encouraging, with average lengths of stay reduced by 0.5 days and average costs of care reduced by 12% for the ten diagnoses studied with no adverse results. Nonstudy diagnoses showed no notable improvement. Recognizing the growing importance of information management not only for clinical decision support but for accommodating all the necessary internal and external reporting requirements will require a significant commitment and investment in technology and personnel resources.

  19. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    the Integrated Management System. CM ensures that during the entire operational life of the plant the following requirements are met: · The basic design requirements of the plant are established, documented and maintained; · The physical structures, systems and components (SSCs) of the plant are in conformity with the design requirements; · The physical and functional characteristics of the plant are correctly incorporated in the operational and maintenance documentation, as well as in the documents for testing and training; · The changes in the design documentation are incorporated in the physical configuration and · the operative documentation; · The changes in the design are minimized by management process for review according to approved criteria. The purpose of this report is to try to clarify the place of configuration management program within the Integrated Management System of Kozloduy NPP and to present the computerized information system for organization of the operational activities (IS OOA) as a tool for effective management of the facility. (authors)

  20. NASA University Program Management Information System

    Science.gov (United States)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  1. A generic hazardous waste management training program

    International Nuclear Information System (INIS)

    Carter, R.J.; Karnofsky, B.

    1988-01-01

    The main purpose of this training program element is to familiarize personnel involved in hazardous waste management with the goals of RCRA and how they are to be achieved. These goals include: to protect health and the environment; to conserve valuable material and energy resources; to prohibit future open dumping on the land; to assure that hazardous waste management practices are conducted in a manner which protects human health and the environment; to insure that hazardous waste is properly managed thereby reducing the need for corrective actions in the future; to establish a national policy to reduce or eliminate the generation of hazardous waste, wherever feasible. Another objective of this progam element is to present a brief overview of the RCRA regulations and how they are implemented/enforced by the Environmental Protection Agency (EPA) and each of the fifty states. This element also discusses where the RCRA regulations are published and how they are updated. In addition it details who is responsible for compliance with the regulations. Finally, this part of the training program provides an overview of the activities and materials that are regulated. 1 ref

  2. Emergency management: Concepts and strategies for effective programs

    OpenAIRE

    Lucus, Valerie

    2007-01-01

    Review of Emergency Management: Concepts and Strategies for Effective Programs By Lucien G. Canton, CEM. By taking a different perspective on local government emergency management programs, this book presents the vision for a very different model--one that includes an independent emergency manager leading an enterprise-wide program focused on strategies that promote disaster resilient communities.

  3. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  4. 76 FR 42536 - Real-Time System Management Information Program

    Science.gov (United States)

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  5. 75 FR 68418 - Real-Time System Management Information Program

    Science.gov (United States)

    2010-11-08

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...) to establish a Real-Time System Management Information Program that provides, in all States, the... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  6. Research of the Rio Grande Ecosystem Management Program

    Science.gov (United States)

    Deborah M. Finch

    2000-01-01

    This paper describes the mission, objectives, and preliminary results of the Middle Rio Grande Ecosystem Management Research Program managed at the Rocky Mountain Research Station's Albuquerque laboratory. This program was initiated in 1994 to address growing pressures to effectively manage the limited resources of the middle Rio Grande Basin. The program is...

  7. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  8. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  9. 77 FR 8219 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... ICMP constitutes an approvable program and that requirements of the Coastal Zone Management Act (CZMA..., submitted a coastal management program to NOAA for approval under the Coastal Zone Management Act (CZMA), 16...

  10. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-09-15

    ... DEPARTMENT OF COMMERCE National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and...: Illinois has submitted a coastal management program to NOAA for approval under the Coastal Zone Management...

  11. Configuration Management for eXtreme Programming

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred; Ekman, T.

    2003-01-01

    Extreme programming (XP) is a software development method that prescribes the use of 12 different practices. Four of these practices (collective code ownership, continuous integration, small releases and refactoring) can indeed be given good support by the use of simple configuration management (CM......) techniques. We report on our experience in providing many groups of novice developers with CM education, processes and tools to support the four CM-related XP practices in their projects. True to the spirit of XP both education and processes are very lightweight and we found that it was sufficient to focus...

  12. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  13. AECL's waste management and decommissioning program

    International Nuclear Information System (INIS)

    Kupferschmidt, W.C.H.

    2006-01-01

    Full text: Canada has developed significant expertise in radioactive waste management since the mid 1940s, when the Canadian nuclear program commenced activities at Chalk River Laboratories (CRL). Atomic Energy of Canada Limited (AECL), created as a Federal Crown Corporation in 1952, continues to manage wastes from these early days, as well as other radioactive wastes produced by Canadian hospitals, universities, industry, and operational wastes from AECL's current programs. AECL is also carrying out decommissioning of nuclear facilities and installations in Canada, predominantly at its own sites in Ontario (CRL, and the Douglas Point and Nuclear Power Demonstration prototype reactors), Manitoba (Whiteshell Laboratories) and Quebec (Gentilly-1 prototype reactor). At the CRL site, several major waste management enabling facilities are being developed to facilitate both the near- and long-term management of radioactive wastes. For example, the Liquid Waste Transfer and Storage Project is underway to recover and process highly radioactive liquid wastes, currently stored in underground tanks that, in some cases, date back to the initial operations of the site. This project will stabilize the wastes and place them in modern, monitored storage for subsequent solidification and disposal. Another initiative, the Fuel Packaging and Storage Project, has been initiated to recover and condition degraded used fuel that is currently stored in below-ground standpipes. The fuel will be then be stored in new facilities based on an adaptation of AECL's proven MACSTOR TM * dry storage system, originally designed for intermediate-term above-ground storage of used CANDU fuel bundles. Other commercial-based development work is underway to improve the storage density of the MACSTOR TM design, and to extend its application to interim storage of used LWR fuels as well as to the storage of intermediate-level radioactive waste arising from upcoming reactor refurbishment activities in Canada

  14. Basic elements of a risk management program

    International Nuclear Information System (INIS)

    Ericson, D.M. Jr.; Varnado, G.B.

    1991-01-01

    The modern industrial manger faces the challenge of safely and efficiently operating increasingly complex, sophisticated, and expensive plants in an atmosphere of reduced resources and increased competition, and frequently with heightened political and public oversight. These political and public concerns have become especially significant where the Federal Government regulates and/or funds programs that have a significant potential for adverse public safety or environmental impacts. Under these circumstances, a major accident or environmental insult could translate into major programmatic delay, redirection, or even plant closing. After-the-fact (reactive) resolution of safety and/or environment problems is both costly and time-consuming process. Therefore, it is prudent for managers at all levels to initiate aggressive proactive efforts to identify and control the risks (hazards) associated with their programs. Unfortunately, risk is not a concept with a single, universally accepted definition. It is most often represented as the product of the probability of occurrence of undesired events and the resultant consequences of those events. The consequences of concern may include: loss of human health, reduction in life expectancy, or loss of life; material or financial losses; environmental damage; or even societal disturbances. This paper discusses risk management and systems safety interest in which has intensified over the post decade principally because of public perceptions of the risks associated with nuclear power and the disposal of hazardous chemical wastes

  15. Evaluation of demand-side management programs

    International Nuclear Information System (INIS)

    Kolbe, A.L.; O'Loughlin, M.P.

    1990-01-01

    Over the past few years, the attention accorded to demand-side management (DSM) measures has called into question the traditional cost minimization approach for evaluating such programs. Two broad approaches to DSM seem to be generally used: one examining the problem from multiple perspectives and the other including various practical methods used in-house by utility planners. Whatever the standard used to evaluate DSM, there remains at least one problem which cannot be quantified. The customers who participate in a DSM program cannot only take into account the effects of DSM on their electricity bills; their comfort can also be affected. This lowering of comfort constitutes a legitimate cost which can explain why some apparently sensible DSM measures are not adopted. A method is proposed to incorporate this cost. It establishes a way to evaluate DSM program tradeoffs that, from the perspective of standard economic theory, maximizes social welfare; explains why at least one of the perspectives in the multiple perspective approach needs to be modified to incorporate all customer costs; and outlines how the proposed standard can be implemented. 8 refs

  16. Regulatory Aspect of an Ageing Management Program

    International Nuclear Information System (INIS)

    Basic, I.; Zabric, I.; Savli, S.

    2006-01-01

    The aspects of plant ageing management (AM) gained increasing attention over the last ten years. Numerous technical studies have been performed to study the impact of ageing mechanisms on the safe and reliable operation of nuclear power plants. National research activities have been initiated or are in progress to provide the technical basis for decision making processes. The long-term operation of nuclear power plants is influenced by economic considerations, the socio-economic environment including public acceptance, developments in research and the regulatory framework, the availability of technical infrastructure to maintain and service the systems, structures and components as well as qualified personnel. Besides national activities there are a number of international activities in particular under the umbrella of the IAEA, the OECD and the EU. The paper will provide the summary on Nuclear Plant Life Management (PLIM) (or Ageing Management Program (AMP)) and Plant Life Extension (PLEX) development in USA and European countries. Also, insights from such effort currently performing in Slovenia will be discussed.(author)

  17. Enrollment of SME Managers to Growth-oriented Training Programs

    DEFF Research Database (Denmark)

    Bager, Torben; Jensen, Kent Wickstrøm; Schou Nielsen, Pia

    2015-01-01

    Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth-intention......Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth...... has from 2012 to 2015 trained about 700 SME managers. Data are currently available for 366 of these participants. This evidence is compared with survey results from a randomly selected control group of 292 growth oriented SME managers in the same firm-size group. The data were analyzed through...... of the program. Originality/value The paper is the first systematic study of the importance of who enrolls in training programs for SME managers....

  18. Development and Implementation of a Program Management Maturity Model

    Energy Technology Data Exchange (ETDEWEB)

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  19. Nuclear Waste Management Program summary document, FY 1981

    International Nuclear Information System (INIS)

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel

  20. Nuclear Waste Management Program summary document, FY 1981

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  1. SELF MANAGEMENT PROGRAM MENINGKATKAN KOPING, NIAT DAN KEPATUHAN BEROBAT PASIEN PJK SETELAH PEMBERIAN SELF MANAGEMENT PROGRAM

    Directory of Open Access Journals (Sweden)

    Hanim mufarokhah mufarokhah

    2016-04-01

    Full Text Available Introduction: Management coronary artery disease required lifelong treatment. The successful management of CHD requires efective coping, intention and medication adherence of CHD’s patients. This study aimed to explain the changes of coping, intention, and medication adherence in patients with CHD after giving self management programme in RSUD Jombang based on Theory Planned Behavior.Method: This study used a quasy experimental pretest-posttest control group design and 28 respondens selected by consecutive sampling. Independent variable was self management programme while dependent variables were coping, intention, medication adherence. Data were collected by using questonnaires measuring coping level, intention and medication adherence. The statistical test used was Mann Whitney, Wilcoxone Signed Rank and t-Test. Result: The result showed that 1 self management programme improve the level of coping in patients with CHD (p < 0,001, 2 self management programme improve the level of intention in patients with CHD (p < 0,001, 3 self management programme improve the level of medication adherence in patients with CHD (p < 0,001. Discussion: To change a behavior requires improvement of coping and intentions. This is in according to the Theory of Planned Behavior that behavior change is influenced by the attitude toward the behavior, subjective norm, perceived behavioral control and intention. Keywords: self management program, coping, intention, medication adherence, coronary heart disease

  2. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  3. 76 FR 47296 - Transit Asset Management (TAM) Pilot Program Funds

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Transit Asset Management (TAM) Pilot... supplemented by Bus Discretionary funds in support of the Transit Asset Management (TAM) Pilot Program, which was announced in the TAM Program Notice of Funding Availability on November 19, 2010. The TAM program...

  4. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  5. Sandia National Laboratories, California Environmental Management System program manual

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  6. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    Science.gov (United States)

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  7. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  8. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  9. 78 FR 43962 - Meeting: RTCA Program Management Committee

    Science.gov (United States)

    2013-07-22

    ... Washington, DC, on June 28, 2013. Paige Williams, Management Analyst, NextGen, Business Operations Group... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Meeting: RTCA Program Management...: Notice of RTCA Program Management Committee Meeting. SUMMARY: The FAA is issuing this notice to advise...

  10. 18 CFR 357.5 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management...: CARRIERS SUBJECT TO PART I OF THE INTERSTATE COMMERCE ACT § 357.5 Cash management programs. Oil pipeline... and § 357.2 of this title that participate in cash management programs must file these agreements with...

  11. 18 CFR 260.400 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management... Cash management programs. Natural gas companies subject to the provisions of the Commission's Uniform... management programs must file these agreements with the Commission. The documentation establishing the cash...

  12. 18 CFR 141.500 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management... OF 1978 STATEMENTS AND REPORTS (SCHEDULES) § 141.500 Cash management programs. Public utilities and... and § 141.1 or § 141.2 of this title that participate in cash management programs must file these...

  13. Managing PBL difficulties in an industrial engineering and management program

    Directory of Open Access Journals (Sweden)

    Anabela Alves

    2016-08-01

    Full Text Available Purpose: Project-Based Learning (PBL is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM, at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning

  14. Managing PBL difficulties in an industrial engineering and management program

    International Nuclear Information System (INIS)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-01-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  15. Managing PBL difficulties in an industrial engineering and management program

    Energy Technology Data Exchange (ETDEWEB)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-07-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  16. A quality management program in intravascular brachytherapy

    International Nuclear Information System (INIS)

    Chakri, Abderrahim; Thomadsen, Bruce

    2002-01-01

    While simple, intravascular brachytherapy (IVB) presents a considerable potential for harm to the patient. The medical physicist maintains the responsibility to minimize the likelihood of operational problems or dosimetric errors. The principals for safe operation remain the same as with any radiotherapy treatment: to deliver the correct dose, to the correct location, safety. To develop an effective and comprehensive quality management (QM) program for IVB, a physicist should utilize proven risk assessment techniques rather than simply thinking of things to check, and follow guidances such as ISO9001:2000. The proposed QM program includes the following: Procedures designed to assure the safety of the patient: Identification of the patient; tests of the integrity and patency for the delivery catheter, operation of the source train, and patency of the catheter in the treatment position; a check for recovery preparations; and verification of source recovery. Procedures to assure positional accuracy of the treatment: Verification of the positioning the catheter in the artery and of the sources in the catheter. Procedures to assure dosimetry accuracy: Acceptance testing of the device, including verification of the source strength and uniformity, and of the treatment duration tables; verification of the treatment prescription and duration for each patient; and control measures that minimize the likelihood of errors removing the source at the correct time

  17. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  18. Thinned pipe management program of Korean NPPs

    International Nuclear Information System (INIS)

    Lee, S.H.; Kim, T.R.; Jeon, S.C.; Hwang, K.M.

    2003-01-01

    Wall thinning of carbon steel pipe components due to Flow-Accelerated Corrosion (FAC) is one of the most serious threats to the integrity of steam cycle systems in Nuclear Power Plants (NPP). If the thickness of a pipe component is reduced below the critical level, it cannot sustain stress and consequently results in leakage or rupture. In order to minimize the possibility of excessive wall thinning, Thinned Pipe Management Program (TPMP) has been set up and being implemented to all Korean NPPs. Important elements of the TPMP include the prediction of the FAC rate for each component based on model analysis, prioritization of pipe components for inspection, thickness measurement, calculation of wear and wear rate for each component. Additionally, decision making associated with replacement or continuous service for thinned pipe components and establishment of long-term strategic management plan based on diagnosis of plant condition regarding overall wall thinning also are essential part of the TPMP. From pre-service inspection data, it has been found that initial thickness is varies, which influences wear and wear rate calculations. (author)

  19. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  20. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  1. Capital Construction Fund Program :: Office of Management and Budget

    Science.gov (United States)

    Leaders Budget Policy Work for NOAA Fisheries Contact Us Programs Sustainable Fisheries Protected Regional Fishery Management Councils Congress Activities Budget Testimony Educators and Students Education Budget Home Appeals Division Budget FOIA Financial Services Saltonstall-Kennedy Grant Program Fisheries

  2. Evaluating forest management policies by parametric linear programing

    Science.gov (United States)

    Daniel I. Navon; Richard J. McConnen

    1967-01-01

    An analytical and simulation technique, parametric linear programing explores alternative conditions and devises an optimal management plan for each condition. Its application in solving policy-decision problems in the management of forest lands is illustrated in an example.

  3. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  4. Learning to Manage: A Program Just for Directors.

    Science.gov (United States)

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  5. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  6. Child Protection Program Implementations in Sport Management

    Directory of Open Access Journals (Sweden)

    Özgün PARASIZ

    2015-07-01

    Full Text Available The protection and provision of the welfare of children who are in a vulnerable condition to all kinds of risk in the modern world in every field they actively take part in is acknowledged as one of the most important social responsibilites of states in this day and age. In the fight against this problem, especially developed countries promote chi ld protection policies and implement them in every sport field children take active part in. The aim of this study is to examine in which dimensions child protection system, defined as the provision of the child’s safety in all aspects including physical, social, emotional, economic, cultural, ethnic, moral, religious and political on a legal basis and in practice, is implemented within the sport systems of England and to identify the policies of sports organizations. In the study, scanning method based o n the literature was used. Research data was obtained by examining the related sources on the subject in various international libraries, journals, books and sports organizations. According to the information obtained in the study, child protection progra ms were identified to be a legal obligation for independent sports organizations responsible for the management of the sport (such as Federations, Olympic committees, sport clubs. The fundamental purpose of child protection programs is to diminish the ris k of all kinds of (sexual, physical and emotional child abuse. Sports organization establish child protection systems within their governing structure and work in coordination with the related units of clubs, federations and central administrations. Moreo ver, by providing special trainings to administrators and coaches, the stipulation of obtaining a special document for coaches who shall work with sportsmen under the age of 18 has been laid down. Special regulations and educational programs for sport fede rations have been prepared intended for the functioning of child protection system in

  7. Disease management programs: barriers and benefits.

    Science.gov (United States)

    Magnezi, Racheli; Kaufman, Galit; Ziv, Arnona; Kalter-Leibovici, Ofra; Reuveni, Haim

    2013-04-01

    The healthcare system in Israel faces difficulties similar to those of most industrialized countries, including limited resources, a growing chronically ill population, and demand for high quality care. Disease management programs (DMPs) for patients with a chronic illness aim to alleviate some of these problems, primarily by improving patient self-management skills and quality of care. This study surveyed the opinions of senior healthcare administrators regarding barriers, benefits, and support for implementing DMPs. Cross-sectional survey. A 21-item questionnaire was self-completed by 87 of 105 (83%) healthcare administrators included in the study. Participants were 65.5% male and 47% physicians, 25.3% nurses, 17.3% administrators, and 10.3% other healthcare professionals. The main perceived benefit of DMPs among all respondents was improving quality of care. Other benefits noted were better contact with patients (81.6%) and better compliance with treatment (75.9%). Efficient long-term utilization of system resources was perceived as a benefit by only 58.6%. The main perceived barriers to implementing DMPs were lack of budgetary resources (69%) and increased time required versus financial compensation received (63.2%). The benefits of DMPs were patient oriented; barriers were perceived as financial and limiting professional autonomy. Information regarding long-term benefits (better patient outcomes) that ultimately provide better value for the system versus short-term barriers (increased costs and expenditures of time without compensation) might encourage the implementation of DMPs in countries faced with a growing population of patients with at least 1 chronic illness.

  8. Environmental Assessment : Squawfish Management Program : Final.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  9. Disease management programs for CKD patients: the potential and pitfalls.

    Science.gov (United States)

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  10. Federal Energy Efficiency through Utility Partnerships: Federal Energy Management Program (FEMP) Program Overview Fact Sheet

    International Nuclear Information System (INIS)

    Beattie, D.; Wolfson, M.

    2001-01-01

    This Utility Program Overview describes how the Federal Energy Management Program (FEMP) utility program assists Federal energy managers. The document identifies both a utility financing mechanism and FEMP technical assistance available to support agencies' implementation of energy and water efficiency methods and renewable energy projects

  11. Export Management Specialist. A Training Program. Instructor's Edition.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This publication provides instructors with materials for an export management specialist (EMS) training program. The objective of the training program is to assist companies in reaching their export goals by educating current and potential managers about the basics of exporting. It provides a foundation for considering international trade and for…

  12. NASA and FAA Programs in Air Traffic Management

    Science.gov (United States)

    Condon, Gregory W.

    1995-01-01

    This presentation will present an overview of NASA and joint NASA/FAA R&D programs related to Air Traffic Management. In addition it will address the plans for the new Advanced Air Transportation Technologies program, which will investigate methods for achieving the airline industries needs for increased flexibility in the nation's air traffic management system.

  13. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  14. Sandia National Laboratories, California Chemical Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  15. Children's Fitness. Managing a Running Program.

    Science.gov (United States)

    Hinkle, J. Scott; Tuckman, Bruce W.

    1987-01-01

    A running program to increase the cardiovascular fitness levels of fourth-, fifth-, and sixth-grade children is described. Discussed are the running environment, implementation of a running program, feedback, and reinforcement. (MT)

  16. Financial Management: Emergency Steel Loan Guarantee Program

    National Research Council Canada - National Science Library

    2001-01-01

    In a February 1, 2001 letter, you expressed concerns about repayments of federally guaranteed loans by borrowers under the Emergency Steel Loan Guarantee Program and the effect of the program on the U.S. steel industry...

  17. Program Management Officer | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... Reviews project and program material and prepares synthesis documents of results, decisions, and directions for team discussion; Researches specific topics of interest to the program to enrich the knowledge of team ...

  18. Radiological control technician: Training program management manual

    International Nuclear Information System (INIS)

    1992-10-01

    This manual defines and describes the DOE Radiological Control Technician Core Training Program qualification and training process, material development requirements, standards and policies, and administration. The manual applies to Radiological Control Technician Training Programs at all DOE contractor sites

  19. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  20. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  1. Managing Student Affairs Programs: Methods, Models, Muddles.

    Science.gov (United States)

    Deegan, William L.

    Management processes and problems are examined in a variety of student affairs contexts. This book (1) proposes a theoretical framework for the analysis of management functions in colleges and universities, (2) studies the practice of management in several different student affairs contexts to uncover current practices, issues, problems, and…

  2. Gravel roads management : volume 3, gravel roads management : programming guide.

    Science.gov (United States)

    2010-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  3. Assurance management program for the 30 Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  4. PROGER - Management program for radioactive wastes in research institutions

    International Nuclear Information System (INIS)

    Ferreira, Rubemar S.; Costa, Maria Regina Ferro; Ramos Junior, Anthenor C.; Esposito, Irapoan; Vaz, Solange dos Reis e; Pontedeiro, Elizabeth May; Gomes, Carlos de Almeida

    1997-01-01

    This article demonstrates the feasibility of a program, denominated PROGER, and aimed at the improvement of radioactive waste management activities in research institutions in Brazil. This program involves implementation, correction and updating of waste management techniques in those institutions that already possess a waste management system or its full set-up for the institutions where it is non-existent. Partial results are presented, concerning characteristics and quantities of wastes, and the methodology utilized by PROGER discussed

  5. Modified benchmarking study of program management within a matrix structure

    OpenAIRE

    Fuller, Robin S.

    1996-01-01

    This thesis sought to identify several organizations representing both the government and commercial industry that were successful in implementing program management within a matrix structure to isolate best-practices that lead to superior performance. Research data were gathered from current and former program managers from these organizations. These managers were queried about their experiences with the matrix structure: the matrix implementation process, benefits, pitfalls, and lessons lea...

  6. [The German program for disease management guidelines--implementation with pathways and quality management].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  7. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Science.gov (United States)

    2010-05-28

    ... DEPARTMENT OF THE TREASURY Terrorism Risk Insurance Program; Litigation Management Submissions... U.S.C. 3506(c)(2)(A)). Currently, the Terrorism Risk Insurance Program Office is seeking comments... or by mail (if hard copy, preferably an original and two copies) to: Terrorism Risk Insurance Program...

  8. Timber management planning with timber ram and goal programming

    Science.gov (United States)

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  9. Effects of a pain program on nurses' pharmacological pain management

    NARCIS (Netherlands)

    Francke, AL; Dingemans, WA; Borg, PAJ; Luiken, JB; Grypdonck, M; Abu-Saad, HH

    1999-01-01

    Surgical nurses from five Dutch general hospitals participated in a continuing education program on pain assessment and management. Effects of the program were measured in a pretest-post-test control group design, in which nursing wards were randomly allocated to the experimental condition (program)

  10. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  11. 76 FR 80342 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-12-23

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... program under the Coastal Zone Management Act (CZMA), as amended at 16 U.S.C. 1451-1466, and the...). SUPPLEMENTARY INFORMATION: The Coastal Zone Management Act authorizes the Secretary of Commerce (Secretary) to...

  12. Anger Management Program Participants Gain Behavioral Changes in Interpersonal Relationships

    Science.gov (United States)

    Pish, Suzanne; Clark-Jones, Teresa; Eschbach, Cheryl; Tiret, Holly

    2016-01-01

    RELAX: Alternatives to Anger is an educational anger management program that helps adults understand and manage anger, develop communication skills, manage stress, and make positive behavioral changes in their interpersonal relationships. A sample of 1,168 evaluation surveys were collected from RELAX: Alternatives to Anger participants over 3…

  13. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  14. Waste management program at Atomic Energy of Canada Limited

    Energy Technology Data Exchange (ETDEWEB)

    Wong, P.C.F.; Chan, N.; Hawrelluk, K. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2011-07-01

    The Atomic Energy of Canada Limited (AECL) Waste Management Program establishes requirements for waste management activities at AECL sites in Canada. It ensures that activities involving planning for, handling, processing, transporting, storage and long-term management of wastes are performed in a manner that protects the workers, the public, and the environment, and are in compliance with applicable regulatory and licence requirements. The program translates applicable legal requirements into program requirements appropriate for AECL, and assists AECL management in implementing those requirements. The Waste Management Program was formally established at AECL in 2007 as one of the nuclear programs. The activities conducted in the first two years (2007 - 09) were mainly focused on program development. Currently the program is executing the waste management improvement initiatives based on the Waste Management Program Improvement Plan. During the program implementation, close collaboration between the Waste Management Program and other departments resulted in improved waste management performance at Chalk River Laboratories (CRL). This included increased segregation of the waste at the source, reduction in waste generation, improved labeling and identification of waste packages, improved recyclables collection and initiating recycling of selected hazardous wastes. In accordance with pollution prevention, the quantities and degree of hazard of wastes requiring long-term management shall be minimized, following the principles of Prevent, Reduce, Reuse, and Recycle. The annual volume of solid waste generated is one of the key indicators for waste management performance. AECL has been successful in reduction of operational waste and diversion of materials for recycling at CRL. From 2007 to 2010, the annual volume of solid waste, including inactive and radioactive wastes, generated from routine operations at CRL decreased by 26%, and the annual amount of recyclables sent

  15. Waste management program at Atomic Energy of Canada Limited

    International Nuclear Information System (INIS)

    Wong, P.C.F.; Chan, N.; Hawrelluk, K.

    2011-01-01

    The Atomic Energy of Canada Limited (AECL) Waste Management Program establishes requirements for waste management activities at AECL sites in Canada. It ensures that activities involving planning for, handling, processing, transporting, storage and long-term management of wastes are performed in a manner that protects the workers, the public, and the environment, and are in compliance with applicable regulatory and licence requirements. The program translates applicable legal requirements into program requirements appropriate for AECL, and assists AECL management in implementing those requirements. The Waste Management Program was formally established at AECL in 2007 as one of the nuclear programs. The activities conducted in the first two years (2007 - 09) were mainly focused on program development. Currently the program is executing the waste management improvement initiatives based on the Waste Management Program Improvement Plan. During the program implementation, close collaboration between the Waste Management Program and other departments resulted in improved waste management performance at Chalk River Laboratories (CRL). This included increased segregation of the waste at the source, reduction in waste generation, improved labeling and identification of waste packages, improved recyclables collection and initiating recycling of selected hazardous wastes. In accordance with pollution prevention, the quantities and degree of hazard of wastes requiring long-term management shall be minimized, following the principles of Prevent, Reduce, Reuse, and Recycle. The annual volume of solid waste generated is one of the key indicators for waste management performance. AECL has been successful in reduction of operational waste and diversion of materials for recycling at CRL. From 2007 to 2010, the annual volume of solid waste, including inactive and radioactive wastes, generated from routine operations at CRL decreased by 26%, and the annual amount of recyclables sent

  16. NEPTUNE Helping Program Managers Understand Their Program Customers

    National Research Council Canada - National Science Library

    Uriell, Zannette

    2004-01-01

    .... This annotated brief outlines some of these studies and discusses in greater detail a recent project that assessed a number of dissimilar programs, leading to the creation of the NEPTUNE System...

  17. Acquisition: Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs

    National Research Council Canada - National Science Library

    2004-01-01

    ... deviations in cost, schedule, and performance requirements in acquisition program baselines for Acquisition Category II and III programs and in identifying whether program managers are reporting...

  18. Management of nonregulatory driven program risks

    International Nuclear Information System (INIS)

    Nielsen, R.R.; Hutterman, L.L.

    1995-01-01

    Evaluation of program risk is a significant part of any environmental restoration (ER) activity. While significant efforts have been made to assess risk to human health and the environment, program risks outside of CERCLA are handled on a fire drill basis. This paper explains a process that looks at program risk, directs mitigation efforts in the most useful path, and focuses corrective actions to obtain the most benefits from the resources used

  19. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  20. Training Programs for Managing Well-being in Companies

    Directory of Open Access Journals (Sweden)

    Treven Sonja

    2015-08-01

    Full Text Available This paper discussed the significance of well-being (WB and well-being management (WBM. As successful WBM requires the implementation of different training programs, such programs are presented in detail. The cause–effect relationship between training and individual/organizational performance is researched as well. The aim of the research to support this article was to present WBM, its training programs, as well as the determination of WBM activities concerning the mentioned programs implemented in Slovenian organizations.

  1. Pooled inventory management: a unique cost-sharing program

    International Nuclear Information System (INIS)

    Bromenschenkel, K.E.

    1984-01-01

    A totally fresh approach to stocking an inventory of costly, long-lead-time nuclear plant equipment became a reality in January, 1981, after three years of effort to form the program. The program, known as Pooled Inventory Management (PIM), is now procuring the first equipment to be stocked in its inventory. This report describes the formation of PIM, how the program works, PIM accomplishments, equipment included in PIM stockpiles, and economics, implementation, and future plans of the program

  2. Educational support programs: Office of Civilian Radioactive Waste Management

    International Nuclear Information System (INIS)

    Williamson, R.C.

    1989-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) currently sponsors two educationally related programs: the Radioactive Waste Management Fellowship Program and the Radioactive Waste Management Research Program for Historically Black Colleges and Universities (HBCU). The graduate fellowship program was implemented in 1985 to meet the US Department of Energy's (DOE's) expected manpower needs for trained scientists and engineers to assist in carrying out the activities of the Nuclear Waste Policy Act. It is recognized that a shortage of master's and doctoral level scientists and engineers in disciplines supportive of the nation's high-level radioactive waste management (RWM) program may impede the DOE's ability to properly carry out its mission under the act. The fellowship program encourages talented undergraduate students to enter graduate programs designed to educate and train them in fields directly related to RWM. The program supports graduate students in various disciplines, including nuclear science and engineering, health physics, and certain area of geology and chemical engineering. It also encourages universities to support and improve research activities and academic programs related to the management of spent nuclear fuel and high-level radioactive waste

  3. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  4. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  5. National Syrian Program for Radioactive Waste Management

    International Nuclear Information System (INIS)

    Othman, I.; Takriti, S.

    2009-06-01

    A national plan for radioactive waste management has been presented. It includes identifying, transport, recording, classifying, processing and disposal. It is an important reference for radioactive waste management for those dealing with radioactive waste, and presents a complete protection to environemnt and people. (author)

  6. TRU Waste Management Program. Cost/schedule optimization analysis

    International Nuclear Information System (INIS)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions

  7. Waste Management Program. Technical progress report, October-December 1982

    International Nuclear Information System (INIS)

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities

  8. Philosophy and overview of the INEL waste management program

    International Nuclear Information System (INIS)

    Gertz, C.P.; Whitsett, J.B.; Hamric, J.P.

    1986-01-01

    The INEL philosophy of ''get the job done; do it right--the first time'' is described as it applies to all phases of waste management activities. In addition, an overview of INEL's waste management programs and projects--low-level waste management operations and technology development; transuranic waste management operations and technology development; high-level waste management operations and technology development; spent fuel storage operations and equipment/technology development; transportation operations, technology development, and prototype cask procurements--are discussed. Emphasis is placed on the application of the INEL philosophy to the successful initiation and continuation of INEL waste management activities

  9. Management and Fragmentation of a Network Program

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg

    This paper contains an analysis of the role of identity in interorganizational collaboration. The case is a network program that involved three parties: eight companies, one consulting institution and a research institution. The purpose of the network program was to develop and test concepts...... and methods within organizational learning and it was supported by the Danish government. The three parties had different roles in the program. The eight companies all participated as experiments for organizational learning. Consultants from the consulting institution acted as consultants on the eight...

  10. Hanford Site Groundwater Protection Management Program: Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site

  11. Defense Leadership and Management Program (DLAMP)

    National Research Council Canada - National Science Library

    Ramp, S

    1997-01-01

    This Directive, under Chapters 23, 33, 41, and 71 of title 5, United States Code, establishes policy and assigns responsibilities for a program of civilian leader training, education, and development...

  12. Best Management Practices, Policies and Programs

    Science.gov (United States)

    The National Great Practice Compendium highlights outstanding activities, technologies, and programs that prevent trash from entering the aquatic environment and/or that reduce the overall volume of trash that is generated.

  13. Program Management Officer -Think Tank Initiative | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... minutes and meeting reports of a technical nature to ensure discussions and decisions are well documented ... the Centre; Reviews project and program material and prepares synthesis documents of results, decisions, ...

  14. Information Management and Employee Assistance Program Imperatives.

    Science.gov (United States)

    Bickerton, Richard

    1987-01-01

    The ALMACA Clearinghouse for Employee Assistance Program (EAP) Information collects and disseminates EAP-specific data to provide subscribers with information to maintain their own competence and to improve upon the understanding and use of EAP practices and procedures. (JOW)

  15. DOE waste management program-current and future

    International Nuclear Information System (INIS)

    Coleman, J.A.

    1993-01-01

    The back end of the nuclear fuel cycle, as well as many operations in the Department of Energy, involves management of radioactive and hazardous waste and spent nuclear fuel. Described herein is the current and anticipated Department's Waste Management Program and general information about the Program for managing and disposing of waste that will illustrate the importance of air cleaning and treatment in assuring protection of the public and our environment. The structure and responsibilities of the Office of Environmental Restoration and Waste Management (EM) are described. The categories of waste managed by the Office of Waste Management (OWM) are defined. The problems of waste management, waste minimization, and waste treatment, storage, and disposal are discussed. 4 figs

  16. 78 FR 24212 - Tribal Management Grant Program

    Science.gov (United States)

    2013-04-24

    ... eligible to receive this grant only if it is incorporated for the primary purpose of improving AI/AN health... that will impact their management capability or prepare them for future improvements to their...

  17. DoD Records Management Program

    National Research Council Canada - National Science Library

    Arnason, C

    1997-01-01

    ... title 36, Code of Federal Regulations, Chapter XII, 'National Archives and Records Administration,' Subchapter B, 'Records Management,' under the Assistant Secretary of Defense for Command, Control, Communications and Intelligence (ASD(C3I...

  18. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  19. Program Director Participation in a Leadership and Management Skills Fellowship and Characteristics of Program Quality.

    Science.gov (United States)

    Carek, Peter J; Mims, Lisa D; Conry, Colleen M; Maxwell, Lisa; Greenwood, Vicki; Pugno, Perry A

    2015-01-01

    The association between a residency program director completing a leadership and management skills fellowship and characteristics of quality and innovation of his/her residency program has not been studied. Therefore, the aim of this study is to examine the association between a residency program director's completion of a specific fellowship addressing these skills (National Institute for Program Director Development or NIPDD) and characteristics of quality and innovation of the program they direct. Using information from the American Academy of Family Physicians (AAFP), National Resident Matching Program (NRMP) and FREIDA® program characteristics were obtained. Descriptive statistics were used to summarize the data. The relationship between programs with a NIPDD graduate as director and program quality measures and indicators of innovation was analyzed using both chi square and logistic regression. Initial analyses showed significant associations between the NIPDD graduate status of a program director and regional location, mean years of program director tenure, and the program's 5-year aggregate ABFM board pass rate from 2007--2011. After grouping the programs into tertiles, the regression model showed significant positive associations with programs offering international experiences and being a NIPDD graduate. Program director participation in a fellowship addressing leadership and management skills (ie, NIPDD) was found to be associated with higher pass rates of new graduates on a Board certification examination and predictive of programs being in the upper tertile of programs in terms of Board pass rates.

  20. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  1. 77 FR 55895 - Meeting: RTCA Program Management Committee (PMC)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Meeting: RTCA Program Management Committee (PMC) AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT...--Concept of Use for Aeronautical Information Services (AIS) and Meteorological (MET) Data Link Services...

  2. Managing Complex Programs in a Post-LSI Environment

    National Research Council Canada - National Science Library

    Mockensturm, Jeffery J

    2008-01-01

    .... External forces played a major role in the evolution of these practices: A defense procurement holiday throughout the 1990s significantly reduced defense procurement spending and commensurate programs to manage...

  3. Comparison of DOE and NIRMA approaches to configuration management programs

    International Nuclear Information System (INIS)

    Yang, E.Y.; Kulzick, K.C.

    1995-01-01

    One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility's design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configuration management program as outlined in the U.S. Department of Energy's (DOE's) DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Program,close quotes with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, open-quotes Position Paper on Configuration Managementclose quotes 2. PP03-1992, open-quotes Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facilityclose quotes 3. PP04-1994 open-quotes Position Paper for Configuration Management Information Systems.close quotes

  4. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  5. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  6. Radioactive Waste Management Fellowship Program: Summary of program activities for calendar year 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This document describes a graduate fellowship program designed to guide future scientists and engineers toward a career in high level radioactive waste management. Oak Ridge Associated Universities administers this program on behalf of 17 participating universities. The report summarizes the background and qualifications of the last year's applicants and awardees and provides examples of the distributed literature describing the program. 8 figs

  7. Cost benefit analysis of the demand side management programs

    International Nuclear Information System (INIS)

    Schechtman, R.; Baum, M.

    1989-01-01

    The several cost and benefit components of the demand side management programs for the society groups, including the concessionaire, consumers and society as a whole are studied. The rule evaluations of management programs by demand side, used by North American concessionaire are also discussed. Finally, the numerical examples, that consolidating the concepts and rules evaluation are presented. (C.G.C.). 5 refs, 1 fig, 3 tabs

  8. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  9. Major Management Challenges and Program Risks: Small Business Administration

    Science.gov (United States)

    2001-01-01

    2001 Major Management Challenges and Program Risks Small Business AdministrationGAO-01-260 Form SF298 Citation Data Report Date ("DD MON YYYY...34) 00JAN2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Small Business ...Administration (SBA) as it seeks to aid, counsel, assist, and protect the interests of the nations small businesses and help businesses and families

  10. Implementing a risk management program at Falconbridge

    International Nuclear Information System (INIS)

    Blechta, G.

    2003-01-01

    A corporate overview of Falconbridge was presented. Falconbridge, founded in 1928 is a leading producer of nickel, copper, cobalt and platinum group metals at low cost. A map displaying its worldwide locations was shown. In Canada, Falconbridge operates in Ontario and Nunavik Territory. The experience in Norway was briefly described, touching on market volatility, market intelligence, portfolio management, and risk management guidelines. The author then explained the purpose of the Energy Project Team, which was responsible for preparing for deregulation, developing strategies for purchasing energy, and minimizing the cost of purchased energy in a competitive market. The plan was described, and the emphasis placed on the core Ontario team. Communication played a large part. The management system functions were reviewed, and analysis provided. The financial integration model was presented. Risk management was dealt with, followed by market intelligence and operational hedge. Division impact was discussed. The major Falconbridge issues were: budget exposure to electricity price variability, how much fixed-price power supply and how long should the contracts be, regulatory structure, market purchase timing, and adhere to corporate risk management policy. The procurement process was described. The author concluded that the product must be kept simple and the number of products limited. A realistic schedule must by adhered to, and a short bidding period of four hours proved ideal. Supplier relationship must be consumer driven. The importance of communication plan was emphasized. Getting pre-approval to make the deal is important. tabs., figs

  11. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  12. Fleet wide motor asset management program

    International Nuclear Information System (INIS)

    Rosemeier, R.G.; Moxie, J.J.; Mendez, W.E.

    2011-01-01

    The Institute of Nuclear Power Operations (INPO) performed several studies concerning the effects of motor failures on US power production. Problems with aging and the lack of preventative maintenance were noted as major contributors to this production loss. Westinghouse has developed, and successfully utilized, a computer program to assist plants in the decision making process for maximizing the operational availability of their motor fleet. The program considers motors of a fleet as a single, critical to production asset, and aids the operator in decisions regarding the following: 1.) Purchase of spares. 2.) Rewind and refurbishment prioritization. 3.) Long-term budget forecasting. (author)

  13. NOSC Program Managers Handbook. Revision 1

    Science.gov (United States)

    1988-02-01

    or creating the appearance of -Using government position for private gain -Giving preferential treatment to persons or organizations -Impeding...8217.3. us d a A c f z Z 3 Zus. W-C 0 0 Z 0~c C. 2 U ca6 4 lie4 Zfe x 0- e, N W w- -3W "Z I N, WISP . -.. -W 23 -0 01 S. 0 X 2 -CNLIZ p4 p4 A-0 .30 -- c...engineering art and a management discipline. This module for project managers is a concise treatment , which only touches on the key topics and issues, of

  14. Strategies in disability management. Corporate disability management programs implemented at the work site.

    Science.gov (United States)

    Kalina, C M

    1999-10-30

    Managers are challenged to demonstrate all programs as economically essential to the business, generating an appreciable return on investment. Further challenge exists to blend and integrate clinical and business objectives in program development. Disability management programs must be viewed as economically essential to the financial success of the business to assure management support for clinical interventions and return-to-work strategies essential for a successful program. This paper discusses a disability management program integrating clinical and business goals and objectives in return-to-work strategies to effect positive clinical, social-cultural, and business results. Clinical, educational, social, and economic challenges in the development, implementation, and continued management of a disability program at a large corporation with multiple global work sites are defined. Continued discussion addresses the effective clinical interventions and educational strategies utilized successfully within the workplace environment in response to each defined challenge. A multiple disciplinary team approach, clinical and business outcome measures, and quality assurance indicators are discussed as major program components. This article discusses a successful program approach focusing on business process and methodology. These parameters are used to link resources to strategy, developing a product for implementing and managing a program demonstrating economic value added through effective clinical medical case management.

  15. 75 FR 60398 - California: Proposed Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-09-30

    ...: Proposed Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... its hazardous waste management program by November 1, 2010. ADDRESSES: Submit your comments... waste management program. EPA continues to have independent enforcement authority under RCRA sections...

  16. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  17. UMTRA Project Administrative Files Collection Records Management Program

    International Nuclear Information System (INIS)

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program

  18. Managing an "Organistically-Oriented" School Intervention Program.

    Science.gov (United States)

    Barrilleaux, Louis E.; Schermerhorn, John R., Jr.

    An "organic" relationship between change agents and clients is a well-popularized goal in recent literature on planned change and organization development. There is, however, a dearth of literature on how to manage change programs under parameters set by this organic value. This paper examines one school organization development program for the…

  19. A Perspective on a Management Information Systems (MIS) Program Review

    Science.gov (United States)

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  20. Resource values in analyzing fire management programs for economic efficiency

    Science.gov (United States)

    Irene A. Althaus; Thomas J. Mills

    1982-01-01

    In analyzing fire management programs for their economic efficiency, it is necessary to assign monetary values to the changes in resource outputs caused by, fire. The derivation of resource values is complicated by imperfect or nonexistent commercial market structures. The valuation concept recommended for fire program analyses is willingness-to-pay because it permits...

  1. Risk Management and Litigation Avoidance in Outdoor Recreation Programming.

    Science.gov (United States)

    Hanna, Glenda

    This paper reviews aspects of Canadian and U.S. law related to liability and negligence of outdoor programs and suggests strategies for risk management. To prove negligence, an individual injured in an outdoor program must prove that the outdoor leader had a duty of care to the participant, standards of care were breached, actual injury was…

  2. Strategic Human Resources Management of Employer Cooperative Education Programs.

    Science.gov (United States)

    Nielsen, Richard P.; Porter, Ralph C.

    1982-01-01

    This article discusses effective strategic planning and management of employer cooperative education programs. It examines types of planning, the need for such programs, and implementation strategies. Several case studies are considered: Dayton-Hudson, IBM, AT&T, Delta Airlines, and Rockwell International. (CT)

  3. An Evaluation of CHAMPS: A Classroom Management Program

    Science.gov (United States)

    Minnear, Holly J.

    2015-01-01

    This dissertation was designed to examine the impact of Conversation, Help, Activity, Movement, Participation, Success (CHAMPS), a classroom management program in elementary schools in a district in North Carolina. The participants included principals and teachers who attended a 2-day training course and implemented the CHAMPS program at their…

  4. Developing fire management mixes for fire program planning

    Science.gov (United States)

    Armando González-Cabán; Patricia B. Shinkle; Thomas J. Mills

    1986-01-01

    Evaluating economic efficiency of fire management program options requires information on the firefighting inputs, such as vehicles and crews, that would be needed to execute the program option selected. An algorithm was developed to translate automatically dollars allocated to type of firefighting inputs to numbers of units, using a set of weights for a specific fire...

  5. Directory of Instructional Programs in Supervision and Management Training.

    Science.gov (United States)

    Civil Service Commission, Washington, DC. Training Assistance Div.

    This directory, which is designed for the use of training officers in the Washington, D.C. area in prescribing learning programs to meet employee training needs, describes available group and self instructional programs used for the training of supervisors and managers. Each of the 21 courses listed contains the pertinent information necessary to…

  6. Core TuLiP - Logic Programming for Trust Management

    NARCIS (Netherlands)

    Czenko, M.R.; Etalle, Sandro; Dahl, V.; Niemelä, I.

    2007-01-01

    We propose CoreTuLiP - the core of a trust management language based on Logic Programming. CoreTuLiP is based on a subset of moded logic programming, but enjoys the features of TM languages such as RT; in particular clauses are issued by different authorities and stored in a distributed manner. We

  7. Outcomes Assessment in Accredited Health Information Management Programs

    Science.gov (United States)

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  8. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia

  9. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has

  10. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories

  11. Waste Management Program: Technical progress report, July-December 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 13 refs., 20 figs., 16 tabs

  12. Small Business Management Volume III: Curriculum. An Adult Education Program.

    Science.gov (United States)

    Persons, Edgar A.; Swanson, Gordon I.

    The small business management adult education program outlined in this curriculum guide is designed to help small business entrepreneurs solve their business management problems and attain the goals they have established for their businesses and their families. (An instructor's manual and practice problems are in separate volumes.) The 3-year…

  13. Sustainable Supply Chain Management Programs in the 21st Century

    Science.gov (United States)

    Neureuther, Brian D.; O'Neill, Kevin

    2011-01-01

    One of the most difficult challenges for an undergraduate supply chain management program at smaller universities is to create an environment of sustainability. Supply chain management is not at the tip of tongue for many graduating high school students and few undergraduate curriculums require a course in the content area. This research addresses…

  14. Waste Management Program: Technical progress report, January-June 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 35 refs., 12 figs., 8 tabs

  15. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  16. The Westinghouse Waste Isolation Division Management and Supervisor Training Program

    International Nuclear Information System (INIS)

    Gilbreath, B.

    1992-01-01

    The Westinghouse Waste Isolation Division (WID) is the management and operating contractor (MOC) for the Department of Energy's (DOE's) Waste Isolation Plant (WIPP). Managers and supervisors at DOE facilities such as the WIPP are required to complete extensive training. To meet this requirement, WID created a self-paced, self-study program known as Management and Supervisor Training (MAST). All WID managers and supervisors are required to earn certification through the MAST program. Selected employees are permitted to participate in MAST with prior approval from their manager and the Human Resources Manager. Initial MAST certification requires the completion of 31 modules. MAST participants check out modules and read them when convenient. When they are prepared, participants take module examinations. To receive credit for a given module, participants must score at least 80 percent on the examination. Lessons learned from the development, implementation, and administration are presented in this paper

  17. DOE reassesses civilian radioactive waste management program

    International Nuclear Information System (INIS)

    Yates, M.

    1990-01-01

    This article reports on the announcement by the Department of Energy (DOE) that the opening of a high-level radioactive nuclear waste repository site will be delayed for seven years. The article discusses DOE's reassessment plan, the restructuring of the Office of Civilian Radioactive Waste Management, site access and evaluation, the Monitored Retrievable Storage Commission proposal, and the industry's response

  18. Land Use Management for Solid Waste Programs

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  19. School District Cash Management. Program Audit.

    Science.gov (United States)

    New York State Legislative Commission on Expenditure Review, Albany.

    New York State law permits school districts to invest cash not immediately needed for district operation and also specifies the kinds of investments that may be made in order to ensure the safety and liquidity of public funds. This audit examines cash management and investment practices in New York state's financially independent school districts.…

  20. French programs for advanced waste management options

    Energy Technology Data Exchange (ETDEWEB)

    Salvatores, M [CEA-DRN (France); Schapira, J P [CNRS-IN2P3 (France); Mouney, H [EDF-DE (France)

    1997-11-01

    Several organisms (CEA, CNRS, EdF, etc.) are cooperating in France on Accelerator-Driven Systems (ADS). The major motivation is the investigation of innovative options for the radioactive waste management. The paper describes the ongoing activities and future directions of this cooperative effort in the field of ADS. 11 refs, 3 figs.

  1. Disease Management, Case Management, Care Management, and Care Coordination: A Framework and a Brief Manual for Care Programs and Staff.

    Science.gov (United States)

    Ahmed, Osman I

    2016-01-01

    With the changing landscape of health care delivery in the United States since the passage of the Patient Protection and Affordable Care Act in 2010, health care organizations have struggled to keep pace with the evolving paradigm, particularly as it pertains to population health management. New nomenclature emerged to describe components of the new environment, and familiar words were put to use in an entirely different context. This article proposes a working framework for activities performed in case management, disease management, care management, and care coordination. The author offers standard working definitions for some of the most frequently used words in the health care industry with the goal of increasing consistency for their use, especially in the backdrop of the Centers for Medicaid & Medicare Services offering a "chronic case management fee" to primary care providers for managing the sickest, high-cost Medicare patients. Health care organizations performing case management, care management, disease management, and care coordination. Road map for consistency among users, in reporting, comparison, and for success of care management/coordination programs. This article offers a working framework for disease managers, case and care managers, and care coordinators. It suggests standard definitions to use for disease management, case management, care management, and care coordination. Moreover, the use of clear terminology will facilitate comparing, contrasting, and evaluating all care programs and increase consistency. The article can improve understanding of care program components and success factors, estimate program value and effectiveness, heighten awareness of consumer engagement tools, recognize current state and challenges for care programs, understand the role of health information technology solutions in care programs, and use information and knowledge gained to assess and improve care programs to design the "next generation" of programs.

  2. Status of the Canadian Nuclear Fuel Waste Management Program

    International Nuclear Information System (INIS)

    Lyon, R.B.

    1985-10-01

    The Canadian Nuclear Fuel Waste Management Program is in the fifth year of a ten-year generic research and development phase. The major objective of this phase of the program is to assess the basic safety and environmental aspects of the concept of isolating immobilized fuel waste by deep underground disposal in plutonic rock. The major scientific and engineering components of the program, namely immobilization studies, geoscience research, and environmental and safety assessment, are well established

  3. Management. Program CIP: Business Management: 52.0204

    Science.gov (United States)

    Murdock, Ashleigh Barbee, Ed.

    2008-01-01

    Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  4. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  5. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs

    International Nuclear Information System (INIS)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs. The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User's Manual, provides detailed instruction on use of the software

  6. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  7. Waste Management Program. Technical progress report, July-December, 1984

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement

  8. Waste Management Program. Technical progress report, Aporil-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  9. First German disease management program for breast cancer.

    Science.gov (United States)

    Rupprecht, Christoph

    2005-01-01

    The first disease management program contract for breast cancer in Germany was signed in 2002 between the Association of Regional of Physicians in North-Rhine and the statutory health insurance companies in Rhineland. At the heart of this unique breast cancer disease management program is a patient-centered network of health care professionals. The program's main objectives are: (1) to improve the quality of treatment and post-operative care for breast cancer patients, (2) to provide timely information and consultation empowering the patient to participate in decisionmaking, (3) to improve the interface between inpatient and outpatient care, and (4) to increase the number of breast-conserving surgeries.

  10. Benchmarking processes for managing large international space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.; Duke, Michael B.

    1993-01-01

    The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

  11. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dormuth, K.W.; Nuttall, K.

    1987-01-01

    Canada has established an extensive research program to develop and demonstrate the technology for safely disposing of nuclear fuel waste from Canadian nuclear electric generating stations. The program focuses on the concept of disposal deep in plutonic rock, which is abundant in the province of Ontario, Canada's major producer of nuclear electricity. Research is carried out at field research areas in the Canadian Precambrian Shield, and in government and university laboratories. The schedule calls for a document assessing the disposal concept to be submitted to regulatory and environmental agencies in late 1988. This document will form the basis for a review of the concept by these agencies and by the public. No site selection will be carried out before this review is completed. 10 refs.; 2 figs

  12. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 13 MAY 2015 2...Threat to our National Economy DOD Cybersecurity Gaps Could Be Canary in Federal Acquisition Coal Mine Intangible Assets Create Vulnerabilities...operational approach integrates with current or planned CONOPS, BCP, information architecture, programs or initiatives Development  Approach to

  13. Status of ageing management program for HANARO

    International Nuclear Information System (INIS)

    Kim, Sang-Jin; Shin, Jin-Won; Kim, Hyung-Kyoo; Jung, Hoan-Sung

    2012-01-01

    HANARO is a 30 MW open pool type research reactor which has been operated for 16 years since its initial criticality in February 1995. It has been used for nuclear material testing, radioisotope production, neutron transmutation doping, nuclear activation analysis, and neutron scattering experiments. Recently, new facilities such as FTL (Fuel Transfer Loop) and CNS (Cold Neutron Source) were installed in the reactor. HANARO was originally designed to operate for at least 20 years under full power operating condition, but the actual life time is expected to be much more than the design lifetime by supporting with a safety reassessment based on realistic data and maintenance activities for an ageing management. The conducted inspections, maintenance activities, and the future plan of the ageing management for HANARO are presented in this paper. (author)

  14. Asset liability management using stochastic programming

    OpenAIRE

    Pirbhai, M; Mitra, G; Kyriakis, T

    2003-01-01

    This chapter sets out to explain an important financial planning model called asset liability management (ALM); in particular, it discusses why in practice, optimum planning models are used. The ability to build an integrated approach that combines liability models with that of asset allocation decisions has proved to be desirable and more efficient in that it can lead to better ALM decisions. The role of uncertainty and quantification of risk in these planning models is con...

  15. Buildings energy management program workshop design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    This document describes activities undertaken by Honeywell's Energy Resources Center for design and development of the format, content, and materials that were used in conducting 129 one-day energy management workshops for specific commercial business audiences. The Building Energy Management Workshop Program was part of a National Workshop Program that was intended to increase awareness of energy-related issues and to encourage energy-conservation actions on the part of commercial and industrial sectors. The total effort included executive conferences for chief executive officers and other senior management personnel; industrial energy-conservation workshops directed at plant management and engineering personnel; vanpooling workshops designed to inform and encourage business in implementing a vanpooling program for employees; and the building energy-management workshops specifically developed for managers, owners, and operators of office and retail facilities, restaurants, and supermarkets. The total program spanned nearly two years and reached approximately 2,500 participants from all parts of the U.S. A detailed followup evaluation is still being conducted to determine the impact of this program in terms of conservation action undertaken by workshop participants.

  16. Practical examples of how knowledge management is addressed in Point Lepreau heat transport ageing management programs

    International Nuclear Information System (INIS)

    Slade, J.; Gendron, T.; Greenlaw, G.

    2009-01-01

    In the mid-1990s, New Brunswick Power Nuclear implemented a Management System Process Model at the Point Lepreau Generating Station that provides the basic elements of a knowledge management program. As noted by the IAEA, the challenge facing the nuclear industry now is to make improvements in knowledge management in areas that are more difficult to implement. Two of these areas are: increasing the value of existing knowledge, and converting tacit knowledge to explicit knowledge (knowledge acquisition). This paper describes some practical examples of knowledge management improvements in the Point Lepreau heat transport system ageing management program. (author)

  17. EPRI'S low-level waste management R ampersand D program

    International Nuclear Information System (INIS)

    Hornibrook, C.

    1997-01-01

    The immediate challenges facing every organization today are to improve its productivity and increase customer satisfaction. The Electric Power Research Institute (EPRI) responded to this challenge by broadening the scope of its low-level waste (LLW) management program. EPRI offered utilities on-site assistance in evaluating and optimizing their liquid- and solid-waste management programs. The goal is to identify open-quotes cheaper, better, and easierclose quotes solutions, which are documented in a series of reports. These provide step-by-step evaluation processes and straightforward implementation methods. Utility professionals are provided with the necessary technical information and justification for informed waste management decisions. The resulting average annual savings is consistently in excess of $700,000 per facility. The program continues to grow and serves as a model for a number of existing and emerging EPRI programs

  18. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Science.gov (United States)

    2010-04-01

    ... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge... 25 Indians 1 2010-04-01 2010-04-01 false Are management systems required for the IRR Program? 170... Program Reviews and Management Systems § 170.502 Are management systems required for the IRR Program? (a...

  19. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  20. Commentary on the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Sheng, G.; Shemilt, L.W.

    1981-01-01

    A summary of the first formal review of the Technical Advisory Committee (TAC) to Atomic Energy of Canada Limited on the Nuclear Fuel Waste Management Program is presented. The Program is described briefly and the composition and role of TAC in relation to the Program is outlined. Salient points and major recommendations are presented from the First Annual Report of TAC in which geoscience aspects of the Program were emphasized. It is the view of the Committee that overall, the whole Waste Management Program is well conceived, that there are many impressive accomplishments of high quality, that detailed research objectives are becoming more clearly delineated, that there is growing clarification as to the most critical areas in which research needs to be accomplished and that the increasing participation by university and industry scientists and engineers is reassuring

  1. [The German program for disease management guidelines. Results and perspectives].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina

    2007-05-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) is a joint initiative of the German Medical Association (umbrella organization of the German Chambers of Physicians), the Association of the Scientific Medical Societies (AWMF), and of the National Association of Statutory Health Insurance Physicians (NASHIP). The program aims at developing, implementing and continuously updating best-practice recommendations for countrywide and regional disease management programs in Germany. Since 2003 twelve national guidelines (topics: asthma, chronic obstructive pulmonary disease, HI (Chronic heart failure), CVD (Chronic coronary heart disease) back pain, depression, several aspects of diabetes) have been produced by use of a standardized procedure in accordance with internationally consented methodologies. For countrywide dissemination and implementation the program uses a wide range of specialist journals, continuous medical education and quality management programs. So far, 36 out of 150 national scientific medical associations, four allied health profession organizations, and twelve national consumer organizations have been participating in the DM-CPG Program. Studies to evaluate the program's effects on health-care providers' behavior and patients' outcomes are under way.

  2. Management program on radioactive wastes in research

    International Nuclear Information System (INIS)

    Xavier, Ana Maria; Wieland, Patricia; Heilbron Filho, Paulo Fernando L.; Ferreira, Rubemar de Souza

    1998-01-01

    This document has the objective to orient and advise the researchers to practice a safety management of radioactive wastes in each research laboratory, based upon the technical norms of the Brazilian Nuclear Energy Commission and the recommendations of the International Atomic Energy Agency. Additionally, basic information on the main radioisotopes used in research are presented, including the processes used for production of radioisotopes, methods for radiation detection, range of alpha and beta particles, background radiation, as well as principles on radioprotection and biological effects of radiation

  3. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  4. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-06-01

    The Pacific Northwest Laboratory (PNL) is a US Department of Energy (DOE) multi-program national laboratory. PNL develops waste management processes and techniques as well as providing management services for characterization and remediation of radioactive and/or hazardous waste sites for the DOE. This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for ''error-free'' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. 6 refs

  5. BNFL nuclear decommissioning liabilities management program

    International Nuclear Information System (INIS)

    Colquhoun, A.P.

    1995-01-01

    The objective of this paper is to describe BNFL's policy and strategy for decommissioning and also to summarize the overall scope of nuclear liabilities in the wider field of waste retrieval and storage, as well as the dismantling and demolition aspects of decommissioning. BNFL's recently established organisational arrangements for discharging all types of these liabilities are explained, together with a review of practical progress in dealing with them. Organisational changes in recent years have amalgamated decommissioning work with operations covering waste storage and retrieval operations. A strategy of minimising residual activity in shutdown plants is pursued, followed by dismantling and demolition on appropriate time scales to minimise risk and cost. Since April 1995, a new BNFL subsidiary, Nuclear Liabilities Management Company Limited has taken responsibility for discharge of BNFL's Waste Retrieval and Decommissioning liabilities on all BNFL sites. NLM has the objectives of optimal and lowest cost management of liabilities and much clearer segregation of physical operations from project specification and planning. The Ministry of Defense (MoD) policy, strategy, work programmes and progress for the Atomic Weapons Establishment (AWE) are also outlined. MoD/AEA has established an equivalent strategy for dealing with its liabilities. (J.S.). 5 refs., 2 figs., 4 appends

  6. Building effective cybersecurity programs a security manager's handbook

    CERN Document Server

    Schreider, Tari

    2017-01-01

    You know by now that your company could not survive without the Internet. Not in today's market. You are either part of the digital economy or reliant upon it. With critical information assets at risk, your company requires a state-of-the-art cybersecurity program. But how do you achieve the best possible program? Tari Schreider, in Building Effective Cybersecurity Programs: A Security Manager's Handbook, lays out the step-by-step roadmap to follow as you build or enhance your cybersecurity program.

  7. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    This report presents a Campbell systematic review on the effectiveness of workplace disability management programs (WPDM programs) promoting return to work (RTW), as implemented and practised by employers. The objectives of this review were to assess the effects of WPDM programs, to examine...... non-randomized studies (NRS) and eleven single group ‘before and after’ studies (B & A)), including data from eleven different WPDM programs, met the inclusion criteria. There were insufficient data on the characteristics of the sample and the effect sizes were uncertain. There is a lack of evidence...

  8. Program Management Approach to the Territorial Development of Small Business

    Directory of Open Access Journals (Sweden)

    Natalia Aleksandrovna Knysh

    2016-06-01

    Full Text Available This article presents the results of the research of the application on a state level of the program management approach to the territorial development of small business. Studying the main mechanism of the state policy implementation in the sphere of small business on a regional level, the authors have revealed the necessity to take into account the territorial specificity while the government programs of small business development are being formed. The analysis of the national practice of utilizing the program management mechanism in the regional system of the government support of small entrepreneurship was conducted on the example of Omsk region. The results of the analysis have shown the inefficiency of the current support system for small business and have determined the need to create an integrated model of territorial programming, which would not only contribute to the qualitative development of small business, but also provide the functioning efficiency of program management mechanism. As a result, the authors have created the two-level model of the programming of the territorial development of small business, which allows to satisfy purposefully the needs of entrepreneurship taking into account the specificity of the internal and external environment of the region. The first level of the model is methodological one and it is based on the marketing approach (the concepts of place marketing and relationship marketing to the operation of the program management mechanism. The second level of the model is methodical one. It offers the combination of the flexible methods of management of programming procedure (benchmarking, foresight, crowdsourcing and outsourcing. The given model raises the efficiency of the management decisions of the state structures in the sphere of small business. Therefore, it is interesting for the government authorities, which are responsible for the regional and municipal support programs of small business, as well

  9. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  10. ERDA's long-term waste management goals and programs

    International Nuclear Information System (INIS)

    Perge, A.F.; Trice, V.G. Jr.; Walton, R.D. Jr.

    1976-01-01

    This paper presents an overview of the ERDA's major program for the long-term waste management of radioactive waste and provides a perspective for symposium participants with regard to the interrelationship of specific components of the program that are discussed in detail in other ERDA-sponsored papers. Needs, goals, and plans are reviewed for ERDA's management of the commercially generated wastes which are expected to be delivered to ERDA in accordance with Federal regulations. At present, ERDA responsibilities include long-term management of commercial-level wastes. Possible future regulations may give ERDA responsibility for the long-term management of commercial low-level solid wastes contaminated with transuranic nuclides. Primary planning goals and programs for the development of terminal storage facilities and waste processing technology to produce acceptable waste forms for long-term management are reviewed for each of the waste types identified above. The status of development programs for the long-term management of airborne radionuclides, which may be required at some time in the future, is also reviewed. (author)

  11. Management characteristics of successful public health programs: "Avahan" HIV prevention program in India.

    Science.gov (United States)

    Mabuchi, Shunsuke; Singh, Suneeta; Bishnu, Rituparna; Bennett, Sara

    2013-01-01

    This paper analyzes Avahan, an HIV prevention program in India, that achieved very rapid scale-up. The paper aims to (i) define the distinctive features of the management of Avahan, (ii) examine how the distinctive features relate to key constructs in management frameworks and (iii) investigate how the management approaches of Avahan contributed to the program's ability to scale-up rapidly while maintaining service quality. The Delphi method was used to identify the distinctive features of Avahan. Through three rounds of questions, 38 participants closely associated with Avahan were asked to identify and develop consensus on its distinctive features. These features were then mapped against the Baldrige Health Care Criteria for Performance Excellence to investigate how they related to important dimensions of management. A total of 17 distinctive features of Avahan were identified. These distinctive features emphasized the importance of data use and performance monitoring at all levels, especially combined with a flexible management style that facilitated local responsiveness to community, innovation and learning. The distinctive features comprehensively addressed the criteria for management excellence in the Baldridge framework. In the case of Avahan, the rigorous application of known management techniques to public health programs appears to have been an important factor in the successful scale-up of the program. Also, the Baldrige criteria seem applicable to health programs in low-income and middle-income countries; further applications would help test their robustness and utility in such contexts. Copyright © 2012 John Wiley & Sons, Ltd.

  12. NEPO cable system aging management programs

    International Nuclear Information System (INIS)

    Toman, G.

    2002-01-01

    Full text: Cable polymer aging and condition monitoring is being studied in detail under the Nuclear Energy Plant Optimization Program (NEPO) that is co-sponsored by the U.S. Department of Energy and EPRI. Significant advances in modeling of polymer aging and condition monitoring have occurred and continue to be developed. The activities include: Analysis of the linearity of the Arrhenius model to room temperature; Development of a wear-out technique for determining remaining life of cable polymers; Determination of the aging fragility point for composite EPR/CSPE insulation with respect to LOCA function; Development of visual/tactile training aids for cable assessment; Development of a totally new nuclear magnetic resonance condition monitoring technique; Assessment of existing techniques with regard to repeatability, accuracy and ease of use. Through use of highly precise oxygen consumption experiments, the linearity of the Arrhenius model is being evaluated. In these experiments, polymer is placed in vials with a known amount of oxygen and aged at much lower temperatures than is possible with standard accelerated aging techniques. aging results are possible at room temperature. The technique is being applied to commonly used insulation and jacket polymers. The wear-out technique allows highly non-linear aging behavior to be made linear. The wearout point of a polymer is determined through high-rate aging and use of a condition monitoring technique to establish the end point. Then, micro-samples of cable that have been naturally aged are subjected to high rate aging to the same end point. The ratio of the remaining high rate aging period to the total high rate aging time provides a linear indication of the remaining service time. Initial screening of nuclear plant cable systems can use visual/tactile techniques to identify cable that has aged significantly. Training aids have been developed by developing sets of specimens with accelerated aging ranging from none

  13. Radwastes management program of the IEN

    International Nuclear Information System (INIS)

    Peres, S.S.; Godoy, J.M.O

    2000-01-01

    Low level radioactive wastes are produced during the operation of the radioactive and nuclear installations of the Nuclear Engineering Institute (Instituto de Engenharia Nuclear, IEN) situated in Rio de Janeiro City, Brazil. These wastes can be generated during the operation and maintenance of the CV-28 Cyclotron, the radioisotopes production, the research activities using natural thorium and uranium in chemical laboratories and, eventually, during the operation Argonauta Reactor. In accordance to the methodology of the radwastes management adopted in the IEN, the wastes are segregated and treated depending on theirs physical, chemical, biological and radiological properties. The wastes with important levels of activity are separate and collected in special containers. Wastes containing short-lived radionuclides are also separated and left away for decaying. Solid wastes are constituted of materials used in laboratories, such as papers, rubber gloves, plastics, over shoes, broken glassware, metal pieces, etc. These wastes are classified as compressible, combustible, non-compressible and non- combustible. The solid wastes are collected in suitable containers placed throughout the working area. Basically, the treatment methods used for these wastes are activity decay, decontamination and compaction. Liquid wastes are generated in small volumes and, generally, containing little quantities of radionuclides. These wastes are classified as aqueous and non-aqueous, acid, alkaline. The diluted aqueous wastes produced in hot laboratories are collected in liquid effluent collection stations for analysis by gamma spectrometry. If the activity concentration is smaller than the established limits in waste management national standards, they are discharge inside of the local sanitary sewer system. Otherwise, these wastes are retained for treatment. The treatment methods used for liquid wastes are activity decay, chemical precipitation, ion exchange and immobilization in inert

  14. [Extraction of management information from the national quality assurance program].

    Science.gov (United States)

    Stausberg, Jürgen; Bartels, Claus; Bobrowski, Christoph

    2007-07-15

    Starting with clinically motivated projects, the national quality assurance program has established a legislative obligatory framework. Annual feedback of results is an important means of quality control. The annual reports cover quality-related information with high granularity. A synopsis for corporate management is missing, however. Therefore, the results of the University Clinics in Greifswald, Germany, have been analyzed and aggregated to support hospital management. Strengths were identified by the ranking of results within the state for each quality indicator, weaknesses by the comparison with national reference values. The assessment was aggregated per clinical discipline and per category (indication, process, and outcome). A composition of quality indicators was claimed multiple times. A coherent concept is still missing. The method presented establishes a plausible summary of strengths and weaknesses of a hospital from the point of view of the national quality assurance program. Nevertheless, further adaptation of the program is needed to better assist corporate management.

  15. Integrated Risk and Knowledge Management Program -- IRKM-P

    Science.gov (United States)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  16. Subjective Experiences of Clients in a Voluntary Money Management Program.

    Science.gov (United States)

    Serowik, Kristin L; Bellamy, Chyrell D; Rowe, Michael; Rosen, Marc I

    2013-01-01

    A large proportion of people diagnosed with mental illnesses have difficulty managing their money, and therefore many psychiatric treatments involve providing money management assistance. However, little is known about the subjective experience of having a money manager, and extant literature is restricted to people forced to work with a representative payee or conservator. In this study, fifteen people were interviewed about their experience receiving a voluntary money management intervention designed to minimize substance use. Clients emphasized the importance of trusting the money manager, financial mindfulness (an enhanced awareness of the financial transactions in clients' day-to-day lives), agency over their own affairs, and addiction. In contrast to evaluations of people assigned representative payees and/or conservators, there was little mention of feeling coerced. These findings suggest that money management programs can address client concerns by building trust, relating budgeting to clients' day-to-day lives, and encouraging clients' control over their own affairs.

  17. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  18. Development of a chronic care ostomy self-management program.

    Science.gov (United States)

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C; Wendel, Christopher S; Krouse, Robert

    2013-03-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long-term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self-Management Program, which was informed by (1) evidence on published quality-of-life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self-Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies.

  19. Development of a Chronic Care Ostomy Self Management Program

    Science.gov (United States)

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C.; Wendel, Christopher S.; Krouse, Robert

    2012-01-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self Management Program, which was informed by (1) evidence on published quality of life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies. PMID:23104143

  20. Sustainability Management Program for Industries- A Case Study

    Directory of Open Access Journals (Sweden)

    Long Su Weng Alwin

    2017-01-01

    Full Text Available This research studied the effectiveness of Sustainability Management Program in improving production efficiency of the manufacturing site with verified result using the regression analysis. For this study, a dairy manufacturing industry located in Malaysia was selected and major energy consuming equipment in the industryplant were identified. Sustainability Management Program (SMP was carried out for three years and energy consumption and product has improved regression coefficients of 0.625 in 2013, 0.826 in 2014, and 0.878 in 2015 as the manufacturing site becomes more energy efficient. This suggests that the energy management should be carried out in a continuous manner with energy management team responsible for energy saving practices.

  1. Enhancing materials management programs in nuclear power plants

    International Nuclear Information System (INIS)

    Hassaballa, M.M.; Malak, S.M.

    1992-01-01

    Materials management programs for the nuclear utilities in the United States are continually being affected, concurrent with the gradual disappearance of qualified component and replacement parts vendors by regulatory concerns about procurement and materials management. In addition, current economic and competitive pressures are forcing utilities to seek avenues for reducing procurement costs for safety-related items. In response to these concerns, initiatives have been undertaken and engineering guidelines have been developed by the nuclear power industry-sponsored organizations, such as the Electric Power Research Institute and the Nuclear Management Resources Council. It is our experience that successful materials management programs require a multitude of engineering disciplines and experience and are composed of three major elements: strategic procurement plan, parts classification and procurement data base, and enhancement tools. This paper provides a brief description of each of the three elements

  2. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    Return-to-work (RTW) following work related injuries or illnesses is receiving continued attention from a wide spectrum of research fields and is an important topic for many policy- and decision-makers. In particular long-term sickness absence is a challenge associated with a series of negative...... is still needed. This review will evaluate the effect of workplace disability management programs promoting RTW - i.e. report on the evidence and describes and combine results from individual studies on workplace disability management programs and explain possible variations in practice....

  3. Small Water System Management Program: 100 K Area

    International Nuclear Information System (INIS)

    Hunacek, G.S. Jr.

    1995-01-01

    Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site's 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410

  4. Figures of merit for measuring aging management program effectiveness

    International Nuclear Information System (INIS)

    Knudson, R.; Sciacca, F.; Walsh, R.; Zigler, G.

    1991-01-01

    One of the requirements for nuclear plant license renewal may be the establishment and demonstration of an effective aging management program. An analysis of both qualitative and quantitative information will be required to define the contents of this aging management program. The authors propose two quantitative figures of merit, Mean Event Detection Frequency and Mean Renewal Rate, that can be used to compare the effectiveness of various inspection, surveillance, test, and monitoring (ISTM) activities for aging mitigation. An example showing the relative effectiveness of an enhanced Loose Parts Monitoring System with current ISTM activities for steam generators and reactor internals is provided. (author)

  5. Underlying chemistry research for the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Torgerson, D.F.; Sagert, N.H.; Shoesmith, D.W.; Taylor, P.

    1984-04-01

    This document reviews the underlying chemistry research part of the Canadian Nuclear Fuel Waste Management Program, carried out in the Research Chemistry Branch. This research is concerned with developing the basic chemical knowledge and under-standing required in other parts of the Program. There are four areas of underlying research: Waste Form Chemistry, Solute and Solution Chemistry, Rock-Water-Waste Interactions, and Abatement and Monitoring of Gas-Phase Radionuclides

  6. File Managing and Program Execution in Web Operating Systems

    OpenAIRE

    Bravetti, Mario

    2010-01-01

    Web Operating Systems can be seen as an extension of traditional Operating Systems where the addresses used to manage files and execute programs (via the basic load/execution mechanism) are extended from local filesystem path-names to URLs. A first consequence is that, similarly as in traditional web technologies, executing a program at a given URL, can be done in two modalities: either the execution is performed client-side at the invoking machine (and relative URL addressing in the executed...

  7. An Improved Dynamic Programming Decomposition Approach for Network Revenue Management

    OpenAIRE

    Dan Zhang

    2011-01-01

    We consider a nonlinear nonseparable functional approximation to the value function of a dynamic programming formulation for the network revenue management (RM) problem with customer choice. We propose a simultaneous dynamic programming approach to solve the resulting problem, which is a nonlinear optimization problem with nonlinear constraints. We show that our approximation leads to a tighter upper bound on optimal expected revenue than some known bounds in the literature. Our approach can ...

  8. A Study of Program Manager Effectiveness and Risk Taking Propensity

    Science.gov (United States)

    1988-09-01

    Kelly Sherwin, my section leader , has been a great source of leadership and inspiration . Next, I would like to thank Lieutenant Colonel Fred Westfall...managers peiZ.rm ten basic tasks which can be broken into three categories. The categories and tasks are: Interpersonal Roles 1. Figurehead 2. Leader 3...17:59). When-a program manager is successful, he is not necessarily effective (10:10). Luthans studied this phenomenon by examining the managerial

  9. Ciclon: A neutronic fuel management program for PWR's consecutive cycles

    International Nuclear Information System (INIS)

    Aragones, J.M.

    1977-01-01

    The program description and user's manual of a new computer code is given. Ciclon performs the neutronic calculation of consecutive reload cycles for PWR's fuel management optimization. Fuel characteristics and burnup data, region or batch sizes, loading schemes and state of previously irradiated fuel are input to the code. Cycle lengths or feed enrichments and burnup sharing for each region or batch are calculate using different core neutronic models and printed or punched in standard fuel management format. (author) [es

  10. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...) and in private industry. Currently-reported earned value data contains invaluable planning and budget information with proven techniques for program management, however, shortcomings of the system are its emphasis...

  11. Review of the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Hatcher, S.R.

    1980-06-01

    Progress over the previous year in the nuclear fuel waste management program is reviewed. Universities, industry and consultants have become increasingly involved, and the work is being overseen by a Technical Advisory Committee. The program has also been investigated by Ontario's Porter Commission and Select Committe on Ontario Hydro Affairs. A public information program has been extended to cover most of the Canadian Shield region of Ontario. Ontario Hydro is studying spent fuel storage and transportation, while AECL is covering immobilization of spent fuel or processing wastes, geotechnical and geochemical research in the laboratory and in the field, design of disposal facilities, and environmental and safety assessments. (L.L.)

  12. A classification of components of workplace disability management programs

    DEFF Research Database (Denmark)

    Gensby, U; Labriola, Merete; Irvin, E

    2014-01-01

    Purpose: This paper presents results from a Campbell systematic review on the nature and effectiveness of workplace disability management programs (WPDM) promoting return to work (RTW), as implemented and practiced by employers. A classification of WPDM program components, based on the review...... were conducted in pairs of reviewers. Studies were clustered around various dimensions of the design and context of programs. Results: 16,932 records were identified by the initial search. 599 papers were assessed for relevance. Thirteen studies met inclusion criteria. Twelve peer reviewed articles...

  13. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    International Nuclear Information System (INIS)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants

  14. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  15. Economic effectiveness of disease management programs: a meta-analysis.

    Science.gov (United States)

    Krause, David S

    2005-04-01

    The economic effectiveness of disease management programs, which are designed to improve the clinical and economic outcomes for chronically ill individuals, has been evaluated extensively. A literature search was performed with MEDLINE and other published sources for the period covering January 1995 to September 2003. The search was limited to empirical articles that measured the direct economic outcomes for asthma, diabetes, and heart disease management programs. Of the 360 articles and presentations evaluated, only 67 met the selection criteria for meta-analysis, which included 32,041 subjects. Although some studies contained multiple measurements of direct economic outcomes, only one average effect size per study was included in the meta-analysis. Based on the studies included in the research, a meta-analysis provided a statistically significant answer to the question of whether disease management programs are economically effective. The magnitude of the observed average effect size for equally weighted studies was 0.311 (95% CI = 0.272-0.350). Statistically significant differences of effect sizes by study design, disease type and intensity of disease management program interventions were not found after a moderating variable, disease severity, was taken into consideration. The results suggest that disease management programs are more effective economically with severely ill enrollees and that chronic disease program interventions are most effective when coordinated with the overall level of disease severity. The findings can be generalized, which may assist health care policy makers and practitioners in addressing the issue of providing economically effective care for the growing number of individuals with chronic illness.

  16. Severe accident management program at Cofrentes Nuclear Power Plant

    International Nuclear Information System (INIS)

    Borondo, L.; Serrano, C.; Fiol, M.J.; Sanchez, A.

    2000-01-01

    Cofrentes Nuclear Power Plant (GE BWR/6) has implemented its specific Severe Accident Management Program within this year 2000. New organization and guides have been developed to successfully undertake the management of a severe accident. In particular, the Technical Support Center will count on a new ''Severe Accident Management Team'' (SAMT) which will be in charge of the Severe Accident Guides (SAG) when Control Room Crew reaches the Emergency Operation Procedures (EOP) step that requires containment flooding. Specific tools and training have also been developed to help the SAMT to mitigate the accident. (author)

  17. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-01-01

    This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for 'error-free' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. (orig.)

  18. Adaptation of an asthma management program to a small clinic.

    Science.gov (United States)

    Kwong, Kenny Yat-Choi; Redjal, Nasser; Scott, Lyne; Li, Marilyn; Thobani, Salima; Yang, Brian

    2017-07-01

    Asthma management programs, such as the Breathmobile program, have been extremely effective in reducing asthma morbidity and increasing disease control; however, their high start-up costs may preclude their implementation in smaller health systems. In this study, we extended validated asthma disease management principles from the Breathmobile program to a smaller clinic system utilizing existing resources and compared clinical outcomes. Cox-regression analyses were conducted to determine the cumulative probability that a new patient entering the program would achieve improved clinical control of asthma with each subsequent visit to the program. A weekly asthma disease management clinic was initiated in an existing multi-specialty pediatric clinic in collaboration with the Breathmobile program. Existing nursing staff was utilized in conjunction with an asthma specialist provider. Patients were referred from a regional healthcare maintenance organization and patients were evaluated and treated every 2 months. Reduction in emergency department (ED) visits and hospitalizations, and improvements in asthma control were assessed at the end of 1 year. A total of 116 patients were enrolled over a period of 1 year. Mean patient age was 6.4 years at the time of their first visit. Patient ethnicity was self-described predominantly as Hispanic or African American. Initial asthma severity for most patients, classified in accordance with national guidelines, was "moderate persistent." After 1 year of enrollment, there was a 69% and 92% reduction in ED/urgent care visits and hospitalizations, respectively, compared with the year before enrollment. Up to 70% of patients achieved asthma control by the third visit. Thirty-six different patients were seen during 1 year for a total of $15,938.70 in contracted reimbursements. A large-scale successful asthma management program can be adapted to a stationary clinic system and achieve comparable results.

  19. 77 FR 47302 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-08-08

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... EPA proposed to authorize South Dakota's State Hazardous waste management Program revisions published... to the hazardous waste program revisions submitted by South Dakota. The Agency published a Proposed...

  20. Overview of the NRC nuclear waste management program

    International Nuclear Information System (INIS)

    Malaro, J.C.

    1976-01-01

    The NRC has firmly established waste management as a high-priority effort and has made the commitment to act rapidly and methodically to establish a sound regulatory base for licensing waste management activities. We believe the priorities for NRC work in waste management are consistent with the needs of the overall national waste management program. Present licensing procedures and criteria are adequate for the short term, and priority attention is being given to the longer term, when the quantities of waste to be managed will be greater and licensing demands will increase. Recognizing that its decision will affect industry, other governmental jurisdictions, private interest groups, and the public at large, NRC has encouraged and will continue to encourage their participation in planning our program. We also recognize that the problems of nuclear waste management are international in scope. Many waste management problems (e.g., potential for contamination of oceans and atmosphere, need for isolation of some wastes for longer periods than governments and political boundaries have remained stable in the past), require a set of internationally acceptable and accepted solutions. The wastes from the U.S. nuclear industry will account for only about one third of the nuclear waste generated in the world. Therefore, we propose to cooperate and where appropriate take the lead in establishing acceptable worldwide policies, standards and procedures for handling nuclear wastes

  1. 77 FR 59758 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection..., (RCRA), allows the Environmental Protection Agency (EPA) to authorize State hazardous waste management... codification of the authorized Idaho hazardous waste management program and incorporates by reference...

  2. 75 FR 76633 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... its federally authorized RCRA Hazardous Waste Management Program. These authorized changes included... with Conditionally Exempt Small Quality Generators (CESQG) waste is subject to RCRA used oil management...

  3. 76 FR 18220 - Labor-Management Cooperation Grant Program Information Collection Request

    Science.gov (United States)

    2011-04-01

    ... FEDERAL MEDIATION AND CONCILIATION SERVICE Labor-Management Cooperation Grant Program Information... submission of the following public information collection request (ICR) to the Office of Management and...-13). This information collection, ``Labor-Management Cooperation Grant Program Information Collection...

  4. The analysis of the program to develop the Nuclear Waste Management System: Allocated requirements for the Office of Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Woods, T.W.

    1991-09-01

    This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)

  5. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Science.gov (United States)

    2010-10-01

    ... PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement Requirements § 423.153 Drug utilization... 42 Public Health 3 2010-10-01 2010-10-01 false Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). 423.153 Section 423.153 Public Health CENTERS FOR MEDICARE...

  6. National Low-Level Waste Management Program Radionuclide Report Series

    International Nuclear Information System (INIS)

    Rudin, M.J.; Stanton, C.; Patterson, R.G.; Garcia, R.S.

    1992-02-01

    This report, Volume 2 of the National Low-Level Radioactive Waste Management Program Radionuclide Report Series, discusses radiological and chemical characteristics of technetium-99. This report also includes discussions about waste streams in which technetium-99 can be found, waste forms that contain technetium-99, and technetium-99's behavior in the environment and in the human body

  7. Emergency Management Operations Process Mapping: Public Safety Technical Program Study

    Science.gov (United States)

    2011-02-01

    services Operational Activity Collect and Manage Cash Donations Once activated, refer cash donations to appropriate voluntary organizations...recovery operations. Operational Activity Conduct Euthanasia /Disposal Provide humane methods to euthanize affected animals to stop the spread of the...issue stop movement orders, and initiate animal vaccination and treatment programs, euthanasia efforts, or other protective measures designed to control

  8. Operations Management in the Design and Execution of MBA Programs

    Science.gov (United States)

    Busing, Michael E.; Palocsay, Susan W.

    2016-01-01

    Master of business administration (MBA) programs are under intense pressure to improve efficiencies, lower tuition, and offer refreshed curriculum that is of high quality and regarded as relevant by the marketplace. In light of this environment, the authors propose a conceptual framework for effectively employing operations management (OM)…

  9. Thailand's National Nutritional Program : Lessons in Management and Capacity Development

    OpenAIRE

    Heaver, Richard; Kachondam, Yongyout

    2002-01-01

    Thailand's community nutrition program has been the most successful in Asia. This paper looks at what made it work from a management and capacity development point of view. Key lessons are identified in the following areas: Building a strong consensus at national and local levels about the importance of nutrition as an investment in the country's future, rather than as a welfare expenditur...

  10. National Low-Level Waste Management Program Radionuclide Report Series

    International Nuclear Information System (INIS)

    Rudin, M.J.; Garcia, R.S.

    1992-02-01

    This report, Volume 3 of the National Low-Level Radioactive Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of carbon-14. The report also discusses waste streams that contain carbon-14, waste forms that contain carbon-14, and carbon-14 behavior in the environment and in the human body

  11. Individual Stress Management Coursework in Canadian Teacher Preparation Programs

    Science.gov (United States)

    Harris, Gregory E.

    2011-01-01

    Teacher stress is a significant issue facing the teaching profession. The current paper explores individual stress management as a viable option to address stress in this profession. Specifically, Canadian teacher education programs are examined to identify the prevalence of pre-service teacher education courses focused on individual stress…

  12. Program Management Educational Needs of Idaho Business and Marketing Teachers

    Science.gov (United States)

    Kitchel, Allen; Cannon, John; Duncan, Dennis

    2009-01-01

    The purpose of this study was to determine the perceived program management professional development needs of Idaho secondary business/marketing teachers (N = 233) in order to guide pre-service curriculum development and in-service training activities. Sixty-two percent (n = 146) of the 233 teachers completed a modified version of Joerger's (2002)…

  13. Assessment of the Business Administration and Business Management Programs.

    Science.gov (United States)

    Forestieri, Kathleen; Karlen, Janice; Coiro, Robert; Gabriel, Theodore; Leff, Elaine; Silverman, Barry; Wertheimer, David

    This document presents City University of New York LaGuardia Community College's Department of Accounting and Managerial Studies assessment of its business and administration and business management programs report, and includes the following items: (1) a description of the mission and goals of the Department of Accounting and Managerial Studies;…

  14. Implications of DOD Funds Execution Policy for Acquisition Program Management

    Science.gov (United States)

    2014-08-01

    package, the Automated Cost Estimating Integrated Tools ( ACEIT ). Using development cost estimation modeling techniques, the team also estimates...using Automated Cost Estimating Integrated Tool ( ACEIT )  An SQL database, known as the Program Financial Management System, currently used by the AH... ACEIT Automated Cost Estimating Integrated Tools AFOTEC Air Force Operational Test and Evaluation Center AFSOC Air Force Special Operations Command

  15. Risk Management: Earning Recognition with an Automated Safety Program

    Science.gov (United States)

    Lansberry, Linden; Strasburger, Tom

    2012-01-01

    Risk management is a huge task that requires diligent oversight to avoid penalties, fines, or lawsuits. Add in the burden of limited resources that schools face today, and the challenge of meeting the required training, reporting, compliance, and other administrative issues associated with a safety program is almost insurmountable. Despite an…

  16. Shuttle Program Information Management System (SPIMS) data base

    Science.gov (United States)

    1983-01-01

    The Shuttle Program Information Management System (SPIMS) is a computerized data base operations system. The central computer is the CDC 170-730 located at Johnson Space Center (JSC), Houston, Texas. There are several applications which have been developed and supported by SPIMS. A brief description is given.

  17. Development of a Standardized Job Description for Healthcare Managers of Metabolic Syndrome Management Programs in Korean Community Health Centers

    Directory of Open Access Journals (Sweden)

    Youngjin Lee, RN, PhD

    2014-03-01

    Conclusion: A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs.

  18. A Review of Ocean Management and Integrated Resource Management Programs from Around the World

    OpenAIRE

    , Seaplan

    2018-01-01

    This draft report is one of several prepared under contract to the Massachusetts Ocean Partnership (MOP) to support the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) in its development of the integrated coastal ocean management plan mandated by the Massachusetts Oceans Act of 2008. The purpose of this report was to inventory and review ocean management and integrated resource management programs from around the world, including the United States, Europe, Australia...

  19. Sandia National Laboratories California Waste Management Program Annual Report April 2011

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2011-04-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  20. The INEL approach: Environmental Restoration Program management and implementation methodology

    International Nuclear Information System (INIS)

    1996-01-01

    The overall objectives of the INEL Environmental Restoration (ER) Program management approach are to facilitate meeting mission needs through the successful implementation of a sound, and effective project management philosophy. This paper outlines the steps taken to develop the ER program, and explains further the implementing tools and processes used to achieve what can be viewed as fundamental to a successful program. The various examples provided will demonstrate how the strategies for implementing these operating philosophies are actually present and at work throughout the program, in spite of budget drills and organizational changes within DOE and the implementing contractor. A few of the challenges and successes of the INEL Environmental Restoration Program have included: a) completion of all enforceable milestones to date, b) acceleration of enforceable milestones, c) managing funds to reduce uncosted obligations at year end by utilizing greater than 99% of FY-95 budget, d) an exemplary safety record, e) developing a strategy for partial Delisting of the INEL by the year 2000, f) actively dealing with Natural Resource Damages Assessment issues, g) the achievement of significant project cost reductions, h) and implementation of a partnering charter and application of front end quality principles

  1. Effectiveness of a Dental Students Stress Management Program

    Directory of Open Access Journals (Sweden)

    Abdullah M. Alzahem

    2015-12-01

    Full Text Available The dental education stress effects and sources were explored thoroughly in the literature, but the effectiveness of stress management programs received less attention. This study introduced a new stress management program, named Dental Education Stress Management (DESM program. It showed its effectiveness in a quasi-experimental pretest-posttest-follow-up-control group design. The new program was based on the principle of psychoeducation and consisted of three 90-min sessions, to teach dental students how to better deal with their stress symptoms and to reduce their general stress level. Two instruments were used to assess the level of stress of the dental students, namely the Dental Environment Stress questionnaire (DES, and the Psychological Stress Measure (PSM-9. Results show that the DESM program has the desired effect of decreasing the stress levels of its participants, and these effects lasted for at least two weeks. Because of several methodological limitations of the study more research is needed to draw more generalizable conclusions.

  2. [Educative programs based on self-management: an integrative review].

    Science.gov (United States)

    Nascimento, Luciana da Silva; de Gutierrez, Maria Gaby Rivero; De Domenico, Edvane Birelo Lopes

    2010-06-01

    The objective was to identify definitions and/or explanations of the term self-management in educative programs that aim its development. The authors also aimed to describe the educative plans and results of the educative programs analyzed. As a methodology we used integrative review, with 15 published articles (2002 the 2007). The inclusion criteria was: the occurrence of the term self-management; the existence of an educative program for the development of self-management; to be related to the area of the health of the adult. Self-management means the improvement or acquisition of abilities to solve problems in biological, social and affective scopes. The review pointed to different educational methodologies. However, it also showed the predominance of traditional methods, with conceptual contents and of physiopathological nature. The learning was evaluated as favorable, with warns in relation to the application in different populations and contexts and to the increase of costs of the educative intervention. It was concluded that research has evidenced the importance of the education for self-management, but lacked in strength for not relating the biopsychosocial demands of the chronic patient and for not describing in detail the teaching and evaluation methodologies employed.

  3. A systematic review of the effectiveness of stroke self-management programs for improving function and participation outcomes: self-management programs for stroke survivors

    NARCIS (Netherlands)

    Warner, G.; Packer, T.L.; Villeneuve, M.; Audulv, A.; Versnel, J.

    2015-01-01

    PURPOSE: A systematic review of stroke self-management programs was conducted to: (i) identify how many and what self-management support strategies were included in stroke self-management interventions and (ii) describe whether self-management programs effectively improved outcomes, focusing

  4. Nuclear Regulatory Commission low-level radioactive waste management program

    International Nuclear Information System (INIS)

    1977-09-01

    It is believed that the priorities of NRC work in low-level waste management as described in this action plan are consistent with the needs of the overall national waste management program. Present licensing procedures and criteria are adequate for the short term, and priority attention is being given to the longer term, when the quantities of waste to be managed will be greater and licensing demand will increase. The plan makes use of expertise within NRC to achieve early results and is coordinated with other Federal agencies having related responsibilities. Since NRC decisions will affect industry, other governmental jurisdictions, private interest groups, and the public at large, procedures were developed to involve them in planning the program

  5. Program integration on the Civilian Radioactive Waste Management System

    International Nuclear Information System (INIS)

    Trebules, V.B.

    1995-01-01

    The recent development and implementation of a revised Program Approach for the Civilian Radioactive Waste Management System (CRWMS) was accomplished in response to significant changes in the environment in which the program was being executed. The lack of an interim storage site, growing costs and schedule delays to accomplish the full Yucca Mountain site characterization plan, and the development and incorporation of a multi-purpose (storage, transport, and disposal) canister (MPC) into the CRWMS required a reexamination of Program plans and priorities. Dr. Daniel A. Dreyfus, the Director of the Office of Civilian Radioactive Waste Management (OCRWM), established top-level schedule, targets and cost goals and commissioned a Program-wide task force of DOE and contractor personnel to identify and evaluate alternatives to meet them. The evaluation of the suitability of Yucca Mountain site by 1998 and the repository license application data of 2001 were maintained and a target date of January 1998 for MPC availability was established. An increased multi-year funding profile was baselined and agreed to by Congress. A $1.3 billion reduction in Yucca Mountain site characterization costs was mandated to hold the cost to $5 billion. The replanning process superseded all previous budget allocations and focused on program requirements and their relative priorities within the cost profiles. This paper discusses the process for defining alternative scenarios to achieve the top-level program goals in an integrated fashion

  6. Geriatric hip fracture management: keys to providing a successful program.

    Science.gov (United States)

    Basu, N; Natour, M; Mounasamy, V; Kates, S L

    2016-10-01

    Hip fractures are a common event in older adults and are associated with significant morbidity, mortality and costs. This review examines the necessary elements required to implement a successful geriatric fracture program and identifies some of the barriers faced when implementing a successful program. The Geriatric Fracture Center (GFC) is a treatment model that standardizes the approach to the geriatric fracture patient. It is based on five principles: surgical fracture management; early operative intervention; medical co-management with geriatricians; patient-centered, standard order sets to employ best practices; and early discharge planning with a focus on early functional rehabilitation. Implementing a geriatric fracture program begins with an assessment of the hospital's data on hip fractures and standard care metrics such as length of stay, complications, time to surgery, readmission rates and costs. Business planning is essential along with the medical planning process. To successfully develop and implement such a program, strong physician leadership is necessary to articulate both a short- and long-term plan for implementation. Good communication is essential-those organizing a geriatric fracture program must be able to implement standardized plans of care working with all members of the healthcare team and must also be able to foster relationships both within the hospital and with other institutions in the community. Finally, a program of continual quality improvement must be undertaken to ensure that performance outcomes are improving patient care.

  7. Creating a foundation for a synergistic approach to program management

    Science.gov (United States)

    Knoll, Karyn T.

    1992-01-01

    In order to accelerate the movement of humans into space within reasonable budgetary constraints, NASA must develop an organizational structure that will allow the agency to efficiently use all the resources it has available for the development of any program the nation decides to undertake. This work considers the entire set of tasks involved in the successful development of any program. Areas that hold the greatest promise of accelerating programmatic development and/or increasing the efficiency of the use of available resources by being dealt with in a centralized manner rather than being handled by each program individually are identified. Using this information, an agency organizational structure is developed that will allow NASA to promote interprogram synergisms. In order for NASA to efficiently manage its programs in a manner that will allow programs to benefit from one another and thereby accelerate the movement of humans into space, several steps must be taken. First, NASA must develop an organizational structure that will allow potential interprogram synergisms to be identified and promoted. Key features of the organizational structure are recommended in this paper. Second, NASA must begin to develop the requirements for a program in a manner that will promote overall space program goals rather than achieving only the goals that apply to the program for which the requirements are being developed. Finally, NASA must consider organizing the agency around the functions required to support NASA's goals and objectives rather than around geographic locations.

  8. Chronic kidney disease management program in Shahreza, Iran.

    Science.gov (United States)

    Barahimi, Hamid; Aghighi, Mohammad; Aghayani, Katayon; Rahimi Foroushani, Abbas

    2014-11-01

    Chronic kidney disease (CKD) is a public health problem that needs an integrated program to be detected, monitored, and controlled. This study reports the results of a CKD program designed and implemented in Shahreza, Iran. After initial evaluation of CKD in Shahreza, a CKD management program was developed in the Ministry of Health and the pilot project was started in February 2011 in Shahreza rural areas. The patients at risk, including those with diabetes mellitus and hypertension, were tested with serum creatinine and urine albumin-creatinine ratio. The CKD management program included training, screening, monitoring, and controlling of weight, hypertension, diabetes mellitus, lipids, and vitamin D. This pilot program was organized in the rural population aged over 30 years who were suffering from hypertension, diabetes mellitus, or both, and resulted in the discovery of cases in various stages of CKD. The prevalence of CKD in this high-risk group was 21.5%. Persistent albuminuria and a glomerular filtration rate less than 60 mL/min/1.73 m(2) were 13% and 11%, respectively. The rate of CKD stages 1, 2, 3a, 3b, 4, and 5 were 2.75%, 6.82%, 10.08%, 0.92%, 0.31%, and 0.17% respectively. After 1 year of the program implemented, incidence rate of CKD was 24% and improvement rate was 21%. In diabetic patients, the mean of hemoglobin A1c decreased from 8.5 ± 1.9% to 7.5% ± 1.8%. Integration of CKD programs in primary health care is possible and results in improvement in management of CKD patients.

  9. Trigeminal neuralgia--a coherent cross-specialty management program.

    Science.gov (United States)

    Heinskou, Tone; Maarbjerg, Stine; Rochat, Per; Wolfram, Frauke; Jensen, Rigmor Højland; Bendtsen, Lars

    2015-01-01

    Optimal management of patients with classical trigeminal neuralgia (TN) requires specific treatment programs and close collaboration between medical, radiological and surgical specialties. Organization of such treatment programs has never been described before. With this paper we aim to describe the implementation and feasibility of an accelerated cross-speciality management program, to describe the collaboration between the involved specialties and to report the patient flow during the first 2 years after implementation. Finally, we aim to stimulate discussions about optimal management of TN. Based on collaboration between neurologists, neuroradiologists and neurosurgeons a standardized program for TN was implemented in May 2012 at the Danish Headache Center (DHC). First out-patient visit and subsequent 3.0 Tesla MRI scan was booked in an accelerated manner. The MRI scan was performed according to a special TN protocol developed for this program. Patients initially referred to neurosurgery were re-directed to DHC for pre-surgical evaluation of diagnosis and optimization of medical treatment. Follow-up was 2 years with fixed visits where medical treatment and indication for neurosurgery was continuously evaluated. Scientific data was collected in a structured and prospective manner. From May 2012 to April 2014, 130 patients entered the accelerated program. Waiting time for the first out-patient visit was 42 days. Ninety-four percent of the patients had a MRI performed according to the special protocol after a mean of 37 days. Within 2 years follow-up 35% of the patients were referred to neurosurgery after a median time of 65 days. Five scientific papers describing demographics, clinical characteristics and neuroanatomical abnormalities were published. The described cross-speciality management program proved to be feasible and to have acceptable waiting times for referral and highly specialized work-up of TN patients in a public tertiary referral centre for headache

  10. Quality Assurance Plan for Transportation Management Division Transportation Training Programs

    International Nuclear Information System (INIS)

    1994-10-01

    The U.S. Department of Transportation (DOT) implemented new rules requiring minimum levels of training for certain key individuals who handle, package, transport, or otherwise prepare hazardous materials for transportation. In response to these rules, the U.S. Department of Energy (DOE), Transportation Management Division (TMD), has developed a transportation safety training program. This program supplies designed instructional methodology and course materials to provide basic levels of DOT training to personnel for whom training has become mandatory. In addition, this program provides advanced hazardous waste and radioactive material packaging and transportation training to help personnel achieve proficiency and/or certification as hazardous waste and radioactive material shippers. This training program does not include site-specific or task-specific training beyond DOT requirements

  11. Best Practices in Academic Management. Study Programs Classification Model

    Directory of Open Access Journals (Sweden)

    Ofelia Ema Aleca

    2016-05-01

    Full Text Available This article proposes and tests a set of performance indicators for the assessment of Bachelor and Master studies, from two perspectives: the study programs and the disciplines. The academic performance at the level of a study program shall be calculated based on success and efficiency rates, and at discipline level, on the basis of rates of efficiency, success and absenteeism. This research proposes a model of classification of the study programs within a Bachelor and Master cycle based on the education performance and efficiency. What recommends this model as a best practice model in academic management is the possibility of grouping a study program or a discipline in a particular category of efficiency

  12. Risk management program for the 283-W water treatment facility

    International Nuclear Information System (INIS)

    Green, W.E.

    1999-01-01

    This Risk Management (RM) Program covers the 283-W Water Treatment Facility (283W Facility), located in the 200 West Area of the Hanford Site. A RM Program is necessary for this facility because it stores chlorine, a listed substance, in excess of or has the potential to exceed the threshold quantities defined in Title 40 of the Code of Federal Regulations (CFR) Part 68 (EPA, 1998). The RM Program contains data that will be used to prepare a RM Plan, which is required by 40 CFR 68. The RM Plan is a summary of the RM Program information, contained within this document, and will be submitted to the U.S. Environmental Protection Agency (EPA) ultimately for distribution to the public. The RM Plan will be prepared and submitted separately from this document

  13. Office of Nuclear Energy Knowledge Management Program Situational Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    Knowledge management (KM) has been a high priority for the Department of Energy (DOE) Office of Nuclear Energy (NE) for the past several years. NE Programs are moving toward well-established knowledge management practices and a formal knowledge management program has been established. Knowledge management is being practiced to some level within each of the NE programs. Although it continues to evolve as NE programs evolve, a formal strategic plan that guides the implementation of KM has been developed. Despite the acceptance of KM within DOE NE, more work is necessary before the NE KM program can be considered fully successful. Per Dr. David J. Skyrme[1], an organization typically moves through the following evolutionary phases: (1) Ad-hoc - KM is being practiced to some level in some parts of the organization; (2) Formal - KM is established as a formal project or program; (3) Expanding - the use of KM as a discipline grows in practice across different parts of the organization; (4) Cohesive - there is a degree of coordination of KM; (5) Integrated - there are formal standards and approaches that give every individual access to most organizational knowledge through common interfaces; and (6) Embedded - KM is part-and-parcel of everyday tasks; it blends seamlessly into the background. According to the evolutionary phases, the NE KM program is operating at the two lower levels, Ad-hoc and Formal. Although KM is being practiced to some level, it is not being practiced in a consistent manner across the NE programs. To be fully successful, more emphasis must be placed on establishing KM standards and processes for collecting, organizing, sharing and accessing NE knowledge. Existing knowledge needs to be prioritized and gathered on a routine basis, its existence formally recorded in a knowledge inventory. Governance to ensure the quality of the knowledge being used must also be considered. For easy retrieval, knowledge must be organized according to a taxonomy that

  14. Learning on human resources management in the radiology residency program

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Aparecido Ferreira de; Lederman, Henrique Manoel; Batista, Nildo Alves, E-mail: aparecidoliveira@ig.com.br [Universidade Federal de Sao Paulo (EPM/UNIFESP), Sao Paulo, SP (Brazil). Escola Paulista de Medicina

    2014-03-15

    Objective: to investigate the process of learning on human resource management in the radiology residency program at Escola Paulista de Medicina - Universidade Federal de Sao Paulo, aiming at improving radiologists' education. Materials and methods: exploratory study with a quantitative and qualitative approach developed with the faculty staff, preceptors and residents of the program, utilizing a Likert questionnaire (46), taped interviews (18), and categorization based on thematic analysis. Results: According to 71% of the participants, residents have clarity about their role in the development of their activities, and 48% said that residents have no opportunity to learn how to manage their work in a multidisciplinary team. Conclusion: Isolation at medical records room, little interactivity between sectors with diversified and fixed activities, absence of a previous culture and lack of a training program on human resources management may interfere in the development of skills for the residents' practice. There is a need to review objectives of the medical residency in the field of radiology, incorporating, whenever possible, the commitment to the training of skills related to human resources management thus widening the scope of abilities of the future radiologists. (author)

  15. Learning on human resources management in the radiology residency program

    International Nuclear Information System (INIS)

    Oliveira, Aparecido Ferreira de; Lederman, Henrique Manoel; Batista, Nildo Alves

    2014-01-01

    Objective: to investigate the process of learning on human resource management in the radiology residency program at Escola Paulista de Medicina - Universidade Federal de Sao Paulo, aiming at improving radiologists' education. Materials and methods: exploratory study with a quantitative and qualitative approach developed with the faculty staff, preceptors and residents of the program, utilizing a Likert questionnaire (46), taped interviews (18), and categorization based on thematic analysis. Results: According to 71% of the participants, residents have clarity about their role in the development of their activities, and 48% said that residents have no opportunity to learn how to manage their work in a multidisciplinary team. Conclusion: Isolation at medical records room, little interactivity between sectors with diversified and fixed activities, absence of a previous culture and lack of a training program on human resources management may interfere in the development of skills for the residents' practice. There is a need to review objectives of the medical residency in the field of radiology, incorporating, whenever possible, the commitment to the training of skills related to human resources management thus widening the scope of abilities of the future radiologists. (author)

  16. Office of Civilian Radioactive Waste Management ensuring quality assurance in the waste management program

    International Nuclear Information System (INIS)

    Kehew, W.J.; Barrett, L.H.

    1991-01-01

    This paper focuses on the Quality Assurance (QA) program of the U.S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM). It describes the objectives and philosophy of quality assurance and the plans and activities that OCRWM is undertaking to implement a fully qualified QA program prior to beginning new site characterization activities in Nevada. This paper outlines OCRWM's plan to implement and use a well-designed and effective QA program throughout all elements of the program. (author) 1 fig., 5 refs

  17. Managing the environmental impacts of utility lighting retrofits programs

    International Nuclear Information System (INIS)

    Cress, K.

    1993-01-01

    One of the most popular demand-side management (DSM) programs currently being sponsored by electric utilities is the removal of old fluorescent light ballasts and replacing them with more efficient models. This type of program, however, can produce a substantial waste stream of the old ballasts, many of which contain Polychlorinated Biphenyl(s) (PCBs), a regulated hazardous substance. The proper disposal of spent light ballasts should be an integral component of DSM programs. This paper will discuss the experience that New England Electric System (NEES) 1 has had with disposing of spent light ballasts resulting from the implementation of our Small Commercial ampersand Industrial Program (a direct install lighting program which provides for the installation of energy efficient lighting measures which include fluorescent fixtures, ballasts and lamps, specular reflectors, compact fluorescent systems, high intensity discharge fixtures, and occupancy sensors. This innovative program is one of the largest in the country and has achieved over 6,000 installations). In this paper, we will review why PCBs are classified as hazardous substances and what effect State and Federal regulations have on the transportation and disposal of ballasts that contain PCBs. Second, we will explain our ballast disposal process which includes collecting, processing, storing, shipping and ultimate disposal. Third, we will discuss our experiences with two different methods of disposal - incineration and recycling. And last we will report on program results

  18. An integrated approach to fire penetration seal program management

    International Nuclear Information System (INIS)

    Rispoli, R.D.

    1996-01-01

    This paper discusses the utilization of a P.C. based program to facilitate the management of Entergy Operations Arkansas Nuclear One (ANO) fire barrier penetration seal program. The computer program was developed as part of a streamlining process to consolidate all aspects of the ANO Penetration Seal Program under one system. The program tracks historical information related to each seal such as maintenance activities, design modifications and evaluations. The program is integrated with approved penetration seal design details which have been substantiated by full scale fire tests. This control feature is intended to prevent the inadvertent utilization of an unacceptable penetration detail in a field application which may exceed the parameters tested. The system is also capable of controlling the scope of the periodic surveillance of penetration seals by randomly selecting the inspection population and generating associated inspection forms. Inputs to the data base are required throughout the modification and maintenance process to ensure configuration control and maintain accurate data base information. These inputs are verified and procedurally controlled by Fire Protection Engineering (FPE) personnel. The implementation of this system has resulted in significant cost savings and has minimized the allocation of resources necessary to ensure long term program viability

  19. The assurance management program for the Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Inertial Confinement Fusion (ICF) approach is explained in general terms. The laser ICF and magnetic fusion facilities are significantly different in that the laser system is used solely as a highly reliable energy source for performing plasma physics experiments related to fusion target development; by contrast, magnetic fusion facilities are themselves the experiments. The Nova project consists of a 10-beam, 74 cm aperture neodymium-glass laser experimental facility which is being constructed by the Lawrence Livermore National Laboratory (LLNL) for the U.S. Department of Energy. Nova has a total estimated cost of $176M and will become operational in the Fall of 1984. The Nova laser will be used as the high energy driver for studying the regime of ignition for ICF. The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  20. Modelling the work flow of a nuclear waste management program

    Energy Technology Data Exchange (ETDEWEB)

    Hoeyer Mortensen, K. [Aarhus Univ., Computer Science Dept. (Denmark); Pinci, V. [Meta Software Corporation, Cambridge, MA (United States)

    1997-03-01

    In this paper we describe a modelling project to improve a nuclear waste management program in charge of the creation of a new system for the permanent disposal of nuclear waste. SADT (Structural Analysis and Design Technique) is used in order to provide a work-flow description of the functions to be performed by the waste management program. This description is then translated into a number of Coloured Petri Nets (CPN or CP-nets) corresponding to different program functions where additional behavioural inscriptions provide basis for simulation. Each of these CP-nets is simulated to produce timed event charts that are useful for understanding the behaviour of the program functions under different scenarios. Then all the CPN models are linked together to form a single stand-alone application that is useful for validating the interaction and cooperation between the different program functions. A technique for linking executable CPN models is developed for supporting large modelling projects and parallel development of independent CPN models. (au) 11 refs.

  1. Modelling the work flow of a nuclear waste management program

    International Nuclear Information System (INIS)

    Hoeyer Mortensen, K.; Pinci, V.

    1997-03-01

    In this paper we describe a modelling project to improve a nuclear waste management program in charge of the creation of a new system for the permanent disposal of nuclear waste. SADT (Structural Analysis and Design Technique) is used in order to provide a work-flow description of the functions to be performed by the waste management program. This description is then translated into a number of Coloured Petri Nets (CPN or CP-nets) corresponding to different program functions where additional behavioural inscriptions provide basis for simulation. Each of these CP-nets is simulated to produce timed event charts that are useful for understanding the behaviour of the program functions under different scenarios. Then all the CPN models are linked together to form a single stand-alone application that is useful for validating the interaction and cooperation between the different program functions. A technique for linking executable CPN models is developed for supporting large modelling projects and parallel development of independent CPN models. (au) 11 refs

  2. 75 FR 45489 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-03

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management Programs'' to...

  3. 76 FR 16000 - Voluntary Protection Programs Information; Extension of the Office of Management and Budget's...

    Science.gov (United States)

    2011-03-22

    ... management programs including how the programs successfully address management leadership and employee...] Voluntary Protection Programs Information; Extension of the Office of Management and Budget's (OMB's... concerning its proposal to extend the Office of Management and Budget's (OMB's) approval of the information...

  4. 41 CFR 301-73.1 - What does the Federal travel management program include?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What does the Federal travel management program include? 301-73.1 Section 301-73.1 Public Contracts and Property Management... PROGRAMS General Rules § 301-73.1 What does the Federal travel management program include? The Federal...

  5. 41 CFR 102-194.5 - What is the Standard and Optional Forms Management Program?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the Standard and Optional Forms Management Program? 102-194.5 Section 102-194.5 Public Contracts and Property Management... PROGRAMS 194-STANDARD AND OPTIONAL FORMS MANAGEMENT PROGRAM § 102-194.5 What is the Standard and Optional...

  6. 2 CFR 215.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Purpose of financial and program management... Financial and Program Management § 215.20 Purpose of financial and program management. Sections 215.21 through 215.28 prescribe standards for financial management systems, methods for making payments and rules...

  7. 34 CFR 74.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Purpose of financial and program management. 74.20... Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments...

  8. 22 CFR 518.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods for...

  9. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  10. Portfolio management of hydropower producer via stochastic programming

    International Nuclear Information System (INIS)

    Liu, Hongling; Jiang, Chuanwen; Zhang, Yan

    2009-01-01

    This paper presents a stochastic linear programming framework for the hydropower portfolio management problem with uncertainty in market prices and inflows on medium term. The uncertainty is modeled as a scenario tree using the Monte Carlo simulation method, and the objective is to maximize the expected revenue over the entire scenario tree. The portfolio decisions of the stochastic model are formulated as a tradeoff involving different scenarios. Numerical results illustrate the impact of uncertainty on the portfolio management decisions, and indicate the significant value of stochastic solution. (author)

  11. Implementation analysis of lean enablers for managing engineering programs

    DEFF Research Database (Denmark)

    von Arnim, Joachim; Oehmen, Josef; Rebentisch, Eric

    2014-01-01

    This paper presents research to improve the applicability of the Lean Enablers and consists of two parts. The first is a case study of a very successful project management maturity improvement initiative at Siemens Industry Sector’s Industry Automation division in the US. It views the initiative...... from the perspective of the Lean Enablers [Oehmen 2012] and is based on information from [Sopko 2012a], [Sopko 2012b], [Sopko 2010], [Sopko 2009], interviews, internal documentation, and the used MSP program management methodology [UK 2011]. The analysis of Lean Enablers incorporated in the MSP...

  12. Sandia National Laboratories, California Waste Management Program annual report : February 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2009-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System rogram Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  13. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  14. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  15. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  16. In-core fuel management programs for nuclear power reactors

    International Nuclear Information System (INIS)

    1984-10-01

    In response to the interest shown by Member States, the IAEA organized a co-ordinated research programme to develop and make available in the open domain a set of programs to perform in-core fuel management calculations. This report summarizes the work performed in the context of the CRP. As a result of this programme, complete in-core fuel management packages for three types of reactors, namely PWR's, BWR's and PHWR are now available from the NEA Data Bank. For some reactor types, these program packages are available with three levels of sophistication ranging from simple methods for educational purposes to more comprehensive methods that can be used for reactor design and operation. In addition some operating data have been compiled to allow code validation. (author)

  17. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  18. The Glen Canyon Dam Adaptive Management Program: An experiment in science-based resource management

    Science.gov (United States)

    kaplinski, m

    2001-12-01

    In 1996, Glen Canyon Dam Adaptive Management (GCDAMP) program was established to provide input on Glen Canyon Dam operations and their affect on the Colorado Ecosystem in Grand Canyon. The GCDAMP is a bold experiment in federal resource management that features a governing partnership with all relevant stakeholders sitting at the same table. It is a complicated, difficult process where stakeholder-derived management actions must balance resource protection with water and power delivery compacts, the Endangered Species Act, the National Historical Preservation Act, the Grand Canyon Protection Act, National Park Service Policy, and other stakeholder concerns. The program consists of four entities: the Adaptive Management Workgroup (AMWG), the Technical Workgroup (TWG), the Grand Canyon Monitoring and Research Center (GCMRC), and independent review panels. The AMWG and TWG are federal advisory committees that consists of federal and state resource managers, Native American tribes, power, environmental and recreation interests. The AMWG is develops, evaluates and recommends alternative dam operations to the Secretary. The TWG translates AMWG policy and goals into management objectives and information needs, provides questions that serve as the basis for long-term monitoring and research activities, interprets research results from the GCMRC, and prepares reports as required for the AMWG. The GCMRC is an independent science center that is responsible for all GCDAMP monitoring and research activities. The GCMRC utilizes proposal requests with external peer review and an in-house staff that directs and synthesizes monitoring and research results. The GCMRC meets regularly with the TWG and AMWG and provides scientific information on the consequences of GCDAMP actions. Independent review panels consist of external peer review panels that provide reviews of scientific activities and the program in general, technical advice to the GCMRC, TWG and AMWG, and play a critical

  19. Sandia National Laboratories, California Hazardous Materials Management Program annual report : February 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2009-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental anagement ystem Program Manual. This program annual report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  20. GESAT: System for management and evaluation of training programs

    International Nuclear Information System (INIS)

    Arjona, O.; Venegas, M.; Rodriguez, L.; Lopez, M.

    1997-01-01

    This paper describe the criteria considered to design the GESAT system, the elements considered to select the relational model, selection of the database language and the main features and possibilities of this system. GESAT allow the management of training programs based on the Systematic Approach to Training. Include the information related with all SAT phases, the results of the job analysis, training plans design, development of materials, training implementation, and the subsequent evaluation

  1. International Border Management Systems (IBMS) Program : visions and strategies.

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, Michael; Mohagheghi, Amir Hossein

    2011-02-01

    Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

  2. Summary of national and international radioactive waste management programs

    International Nuclear Information System (INIS)

    Harmon, K.M.

    1979-03-01

    This report summarizes information collected on the status of fuel cycle and waste management programs in Argentina, Australia, Austria, Belgium, Brazil, Canada, China, Denmark, Finland, France, Democratic Republic of Germany, Federal Republic of Germany, India, Iran, Italy, Japan, Mexico, the Netherlands, Pakistan, Spain, Sweden, Switzerland, United Kingdom, United States, and USSR. This compilation attempts to provide current information as of the end of January 1979

  3. Tank waste remediation system nuclear criticality safety program management review

    International Nuclear Information System (INIS)

    BRADY RAAP, M.C.

    1999-01-01

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999

  4. Fuel cycle and waste management demonstration in the IFR Program

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Benedict, R.W.; Laidler, J.J.; Battles, J.E.; Miller, W.E.

    1992-01-01

    Argonne's National Laboratory's Integral Fast Reactor (IFR) is the main element in the US advanced reactor development program. A unique fuel cycle and waste process technology is being developed for the IFR. Demonstration of this technology at engineering scale will begin within the next year at the EBR-II test facility complex in Idaho. This paper describes the facility being readied for this demonstration, the process to be employed, the equipment being built, and the waste management approach

  5. Assess program: Interactive data management systems for airborne research

    Science.gov (United States)

    Munoz, R. M.; Reller, J. O., Jr.

    1974-01-01

    Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

  6. Neuro-linguistic programming as a communication tool for management

    OpenAIRE

    2014-01-01

    M.Com. (Business Management) The outcome of the study was to explore the use of neuro linguistic programming as a communication tool that enhances communication in the workplace, and the results revealed that NLP business communications differ from the usual workplace communications. They involve communications that identify explicit and achievable outcomes, use sensory awareness to notice responses and flexibly alter behaviour to achieve outcomes. Participants were noticing and discoverin...

  7. Risk Management for Study Abroad Programs: Issues and Resources to Inform Program Development, Administration, and Training

    Science.gov (United States)

    Rhodes, Gary

    2014-01-01

    This chapter provides a practical background to the health and safety risks and challenges for U.S. colleges and universities and other program providers. Potential risks, field-based guidelines, good practices, and resources to support the management of risks by study abroad offices will be covered.

  8. Effects of a cognitive-behavioral pain-management program.

    Science.gov (United States)

    Johansson, C; Dahl, J; Jannert, M; Melin, L; Andersson, G

    1998-10-01

    A cognitive behavioral multidisciplinary pain management program was evaluated in two separate outcome studies; one controlled study (study I) and one study conducted on a consecutive sample with a long-term follow-up (study II). The 4-week inpatient treatment program included education sessions, goal setting, graded activity training, pacing, applied relaxation, cognitive techniques, social skills training, drug reduction methods, contingency management of pain behaviors, and planning of work return. The outcome of study I showed significant between-group differences in favor of the treatment group on measures of occupational training at 1-month follow-up, activity level in the sparetime at post-treatment and at follow-up, and decreased catastrophizing and pain behaviors at post-treatment. In study II significant improvements over time were found on measures of sick leave, pain intensity, pain interference, life control, affective distress, activity level in the sparetime, physical fitness and use of analgetics at 2-month follow-up and at 1-year follow-up. The results of the two outcome studies reported show that cognitive behavioral multidisciplinary pain management programs can successfully be applied to Swedish musculoskeletal pain patients.

  9. Line Program Environmental Management Audit: Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the results of the Line Program Environmental Management Audit completed for the Formerly Utilized Sites Remedial Action Program (FUSRAP). During this Audit, activities and records were reviewed and personnel interviewed at Oak Ridge, Tennessee. Additionally, since FUSRAP falls under the responsibility of the Office of the Assistant Secretary for Environmental Restoration and Waste Management, selected individuals from this office were interviewed in Washington, DC and Germantown, Maryland. The onsite portion of the FUSRAP Audit was conducted from March 16 through 27, 1992, by the US Department of Energy's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety and Health (EH-1). The scope of the FUSRAP Line Program Environmental Management Audit was comprehensive and included all areas of environmental management with the exception of the National Environmental Policy Act (NEPA). Since the subject of compliance with and implementation of the requirements of NEPA is the responsibility of the DOE Headquarters Office of NEPA Oversight, management issues pertaining to NEPA were not investigated as part of this Audit

  10. Blazing the energy trail: The Municipal Energy Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Urban Consortium Energy Task Force pioneers energy and environmental solutions for US cities and counties. When local officials participate in the task force, they open the door to many resources for their communities. The US is entering a period of renewed interest in energy management. Improvements in municipal energy management allow communities to free up energy operating funds to meet other needs. These improvements can even keep energy dollars in the community through the purchase of services and products used to save energy. With this idea in mind, the US Department of Energy Municipal Energy Management Program has funded more than 250 projects that demonstrate innovative energy technologies and management tools in cities and counties through the Urban Consortium Energy Task Force (UCETF). UCETF helps the US Department of Energy foster municipal energy management through networks with cities and urbanized counties and through links with three national associations of local governments. UCETF provides funding for projects that demonstrate innovative and realistic technologies, strategies, and methods that help urban America become more energy efficient and environmentally responsible. The task force provides technical support to local jurisdictions selected for projects. UCETF also shares information about successful energy management projects with cities and counties throughout the country via technical reports and project papers. The descriptions included here capsulize a sample of UCETF`s demonstration projects around the country.

  11. Professional Preparation in Athletic Administration and Sport Management: Undergraduate and Graduate Programs in Canada.

    Science.gov (United States)

    Parkhouse, Bonnie L.; Stoy, Christopher J.

    1979-01-01

    Programs in athletic administration and sport management offered by four Canadian institutions are briefly outlined with information including availability of financial aid, degree requirements, and program description. (JMF)

  12. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    Science.gov (United States)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  13. [Disease management programs: Difficulties in the analysis of benefit].

    Science.gov (United States)

    Linder, Roland; Horenkamp-Sonntag, D; Bestmann, B; Battmer, U; Heilmann, T; Verheyen, F

    2015-04-01

    After an introduction to the theme with an overview of the implementation of the Disease Management Programs (DMP), accompanying documentation, present utilization and costs of the programs, the present article is primarily devoted to the issue of the analysis of the benefits of DMP. Following an assessment of the legally specified evaluation requirements, in the absence of a prospective, randomized, controlled trial (RCT), the results of three studies are first summarized, which, with the application of propensity score matching, utilize the routine data of the statutory health insurance schemes to form a control group. The overview concludes with a look at the planned changes in evaluation and the intended expansion of the DMP to programs for other chronic illnesses.

  14. MORT: a safety management program developed for ERDA

    International Nuclear Information System (INIS)

    1977-03-01

    ERDA's System Safety Development Center (SSDC) is located at the Idaho National Engineering Laboratory under the EG and G Idaho, Inc., contract administered by the Idaho Operations Office. The SSDC performs a variety of tasks for ERDA's Division of Safety, Standards, and Compliance, for the purpose of improvement and application of safety program elements. Primary among these tasks are development and demonstration of new methodologies, training, consultation, and technical writing. This information package (ERDA 77-38) is an example of the later task, aimed at communicating to a general audience the nature and purpose of major features of the Management Oversight and Risk Tree (MORT) program. The SSDC also originates a guideline series of monographs (the ERDA 76-45 series) for individuals who desire more specific explanations of the MORT program

  15. Trigeminal neuralgia – a coherent cross-specialty management program

    DEFF Research Database (Denmark)

    Heinskou, Tone; Maarbjerg, Stine; Rochat, Per Bjørnstad

    2015-01-01

    of TN. METHODS: Based on collaboration between neurologists, neuroradiologists and neurosurgeons a standardized program for TN was implemented in May 2012 at the Danish Headache Center (DHC). First out-patient visit and subsequent 3.0 Tesla MRI scan was booked in an accelerated manner. The MRI scan...... for neurosurgery was continuously evaluated. Scientific data was collected in a structured and prospective manner. RESULTS: From May 2012 to April 2014, 130 patients entered the accelerated program. Waiting time for the first out-patient visit was 42 days. Ninety-four percent of the patients had a MRI performed......: The described cross-speciality management program proved to be feasible and to have acceptable waiting times for referral and highly specialized work-up of TN patients in a public tertiary referral centre for headache and facial pain. Early high quality MRI ensured correct diagnosis and that the neurosurgeons...

  16. 75 FR 50932 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-08-18

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...-1990. FOR FURTHER INFORMATION CONTACT: Robin Biscaia, RCRA Waste Management Section, Office of Site... final [[Page 50933

  17. Transportation risk management : international practices for program development and project delivery.

    Science.gov (United States)

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  18. Practical standard for nuclear power plant life management programs: 2007

    International Nuclear Information System (INIS)

    2006-03-01

    The standard specifies the method of implementing nuclear power plant life management programs. The plant life management programs evaluate the integrity of the plant structures, systems and components, assessing if appropriate measures are taken against existing aging phenomena, if there are possibilities of occurrence and development of aging phenomena and if a sufficient level of margin is maintained to assure the integrity throughout the future operating period. The programs also assess the validity of the current maintenance activities, such as trend monitoring, walkdowns, periodic tests and inspections, repair and replacement work for the purpose of preventive maintenance, and utilization of lessons learned from past trouble experience, in order to newly identify maintenance measures. The technical evaluation on aging phenomena is conducted to establish the 10 year maintenance program for nuclear power plants until the plant reaches 30 years of service. The standard was established and issued by the Atomic Energy Society of Japan (AESJ) through the discussion of experts in the associated fields. (T. Tanaka)

  19. A concept for performance management for Federal science programs

    Science.gov (United States)

    Whalen, Kevin G.

    2017-11-06

    The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.

  20. The research program coordinator: an example of effective management.

    Science.gov (United States)

    Merry, Lisa; Gagnon, Anita J; Thomas, Julia

    2010-01-01

    Careers in clinical research management are increasingly common. Despite nurses' important role in clinical research, their status as research professionals is underrecognized. In this article, we describe the role of a "program coordinator" (PC) in the context of a complex research program on migration and reproductive health. The PC role expands beyond the usual role of a research coordinator because he or she is involved in all aspects of the program of research and his or her responsibilities include research, education, clinical, and administration components. He or she ensures optimal organization and continuity across several studies and ensures ethical and scientific standards are applied for each individual study. His or her clinical knowledge assures data are accurate and subjects are safe. In addition, he or she assists with applying for funding, the maintenance of research partnerships, and dissemination of research findings; he or she supports students' learning and completes all regulatory aspects related to the program of research. Key to the PC role is relationship building and the application of Good Clinical Practice principles. The advanced role of a PC also warrants opportunities for professional development and a competitive salary. A PC is an effective approach for research management and a natural role for professional nurse. Copyright 2010 Elsevier Inc. All rights reserved.

  1. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    International Nuclear Information System (INIS)

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-01-01

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials

  2. Nevada Risk Assessment/Management Program scientific peer review

    International Nuclear Information System (INIS)

    Bentz, E.J. Jr.; Bentz, C.B.; O'Hora, T.D.; Chen, S.Y.

    1997-01-01

    The 1,350 square-mile Nevada Test Site and additional sites in Nevada served as the continental sites for US nuclear weapons testing from 1951 to 1992. The Nevada Risk Assessment/Management Program (NRAMP) is a currently on-going effort of the Harry Reid Center for Environmental Studies at the University of Nevada, Las Vegas (UNLV) and the firm of E. J. Bentz and Associates, Inc., in cooperation with the US Department of Energy (DOE) Environmental Management Program. Argonne National Laboratory is one of several public and private organizations supporting personnel appointed by the NRAMP to the NRAMP Scientific Peer Review Panel. The NRAMP is part of a national effort by the DOE to develop new sources of information and approaches to risk assessment, risk management, risk communication, and public outreach relevant to the ecological and human health effects of radioactive and hazardous materials management and site remediation activities. This paper describes the development, conduct, and current results of the scientific peer review process which supports the goals of the NRAMP

  3. Fisheries and Oceans Canada - habitat management program in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    On May 5, 2011, the Ontario Waterpower Association hosted the emergent hydro workshop in Peterborough. In the course of the workshop, Fisheries and Oceans Canada presented the habitat management program in Ontario. Fisheries and Oceans Canada explained that their role is to protect water resources. The Fisheries Act was passed to manage fisheries and fish habitats in Canada and to protect them from harmful alteration, disruption or destruction. The policy for the management of fish was written to interpret the Fisheries Act and enhance the productive capacity of fish habitats. In addition, two other Acts were passed, the Species at Risk Act and the Canadian Environmental Assessment Act, designed to protect species from extinction and improve coordination of, and public access to EA information. This presentation highlighted the different existing policies aimed at protecting fisheries and fish habitats in Canada.

  4. Implementation of a management applied program for solid radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y. H.; Kim, T. K.; Kang, I. S.; Cho, H. S.; Son, J. S. [KAERI, Taejon (Korea, Republic of)

    2004-07-01

    Solid radioactive wastes are generated from the Post-irradiated Fuel Examination Facility, the Irradiated Material Examination Facility, the Research Reactor, and the laboratories at KAERI. A data collection of a solid radioactive waste treatment process of a research organization became necessary while developing the RAWMIS(Radioactive Waste Management Integration System) which it can generate personal history management for efficient management of a waste, documents, all kinds of statistics. This paper introduces an input and output application program design to do to database with data in the results and a stream process of a treatment that analyzed the waste occurrence present situation and data by treatment process. Data on the actual treatment process that is not limited experiment improve by a document, human traces, saving of material resources and improve with efficiency of tracking about a radioactive waste and a process and give help to radioactive waste material balance and inventory study.

  5. INEEL Cultural Resource Management Program Annual Report - 2004

    Energy Technology Data Exchange (ETDEWEB)

    Clayton F. Marler

    2005-01-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.

  6. INEEL Cultural Resource Management Program Annual Report - 2004

    International Nuclear Information System (INIS)

    Clayton F. Marler

    2005-01-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site

  7. Software requirements specification for the program analysis and control system risk management module

    International Nuclear Information System (INIS)

    SCHAEFER, J.C.

    1999-01-01

    TWR Program Analysis and Control System Risk Module is used to facilitate specific data processes surrounding the Risk Management program of the Tank Waste Retrieval environment. This document contains the Risk Management system requirements of the database system

  8. 75 FR 54591 - Notice of Agricultural Management Assistance Organic Certification Cost-Share Program

    Science.gov (United States)

    2010-09-08

    ...] Notice of Agricultural Management Assistance Organic Certification Cost-Share Program AGENCY... Agricultural Management Assistance Organic Certification Cost-Share Program. SUMMARY: This Notice invites the... Agreement with the Agricultural Marketing Service (AMS) for the Allocation of Organic Certification Cost...

  9. 77 FR 65351 - Missouri: Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-26

    ...: Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental Protection Agency (EPA... Jackson-Johnson, Environmental Protection Agency, Waste Enforcement & Materials Management Branch, 11201... its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA proposes to...

  10. The US Global Change Data and Information Management Program Plan

    International Nuclear Information System (INIS)

    1992-01-01

    The US Global Change Research Program (USGCRP) requires massive quantities of highly diverse data and information to improve our understanding of global change processes. The Committee on Earth and Environmental Sciences (CEES) comprises Federal agencies that need to provide reliable data and information for this purpose from existing programs and archives and from new activities designed to improve upon the data and information. This US Global Change Data and Information Management Program Plan commits the participating Federal agencies to work with each other, with academia, and with the international community to make it as easy as possible for researchers and others to access and use global change data and information. Toward this end, the agencies are organizing a Global Change Data and Information System (GCDIS), which takes advantage of the mission resources and responsibilities of each agency. Sources for global change data and information are national and international agency programs, including those focused on the USGCRP, such as NASA's Earth Observing System [EOS] and other agency global change initiatives and those contributing to the USGCRP from other agency programs not focused on global change. Data and information include raw data from observation systems, value-added data from data assembly activities, and derived data and information from models and other investigations. Additional data and information are identified from appropriate sources including academia and the international community

  11. SRS ES ampersand H standards compliance program management plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan

  12. Economic profitability analysis of demand side management program

    International Nuclear Information System (INIS)

    Sheen, J.N.

    2005-01-01

    This study considers both the internal and external costs of the utility in deriving the avoided capacity cost (ACC) and avoided operating cost (AOC) induced in an electric utility caused by the implementation of a demand side management program (DSM). In calculating the ACC, a multiple objective linear programming model is developed. Meanwhile, the AOC is calculated by considering the differences between the total and specific time period energy consumption ratios before and after the implementation of the DSM program. This study also develops an economic analysis method using Net Present Value and Pay Back Year models to assess the economic profitability of implementing a DSM program from a participant's point of view. The design and construction of a partial load leveling eutectic salt Cooling Energy Storage (CES) air conditioning system in a target office building in Kaohsiung, Taiwan, is discussed in order to simulate the cost benefit of the CES system from the perspective of the utility and from that of the participant. The results confirm the effectiveness of the developed models in simulating the economic benefits of implementing a DSM program from the perspectives of both the utility and the participant

  13. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  14. Program for accident and incident management support, AIMS

    International Nuclear Information System (INIS)

    Putra, M.A.

    1993-12-01

    A prototype of an advisory computer program is presented which could be used in monitoring and analyzing an ongoing incident in a nuclear power plant. The advisory computer program, called the Accident and Incident Management Support (AIMS), focuses on processing a set of data that is to be transmitted from a nuclear power plant to a national or regional emergency center during an incident. The AIMS program will assess the reactor conditions by processing the measured plant parameters. The applied model of the power plant contains a level of complexity that is comparable with the simplified plant model that the power plant operator uses. A standardized decay heat function and a steam water property library is used in the integral balance equations for mass and energy. A simulation of the station blackout accident of the Borssele plant is used to test the program. The program predicts successively: (1) the time of dryout of the steam generators, (2) the time of saturation of the primary system, and (3) the onset of core uncovery. The coolant system with the actual water levels will be displayed on the screen. (orig./HP)

  15. A lifecycle management program for NPP turbine balance of plant

    International Nuclear Information System (INIS)

    Manabe, Jun; Yamakami, Katsuhiko; Hiraoka, Satoshi; Kawai, Toshinari

    2009-01-01

    A lifecycle management program, for turbine balance of plant of light water reactor units which had been operated for more than 20 years but still having a long intended residual life time, was proposed and implemented from the view point of system and equipment supplier. Here would be introduced the program executed for several utilities. The program consists of unit surveillance analyzing both operation and inspection data, degradation assessment for the equipment and prospecting for the future by planning the proper measures for the issues based on both technology and economy. The program is introduced exampling the generating power affected by main steam pressure reduction derived from the scale adhesion and degradation of equipment. Multidisciplinary optimum design for the replacement of the feedwater heaters, one of the items of the planning, is introduced. Additionally would be introduced the new concept maintenance support program, mainly applied to the units already replaced their principal machines and auxiliaries, configured with both the condition based maintenance system monitoring the trend of parameters of a component and the diagnosis of malfunctions ascertaining the equipment by analyzing and synthesizing operation parameters. (author)

  16. Evaluating disease management program effectiveness: an introduction to survival analysis.

    Science.gov (United States)

    Linden, Ariel; Adams, John L; Roberts, Nancy

    2004-01-01

    Currently, the most widely used method in the disease management industry for evaluating program effectiveness is the "total population approach." This model is a pretest-posttest design, with the most basic limitation being that without a control group, there may be sources of bias and/or competing extraneous confounding factors that offer plausible rationale explaining the change from baseline. Survival analysis allows for the inclusion of data from censored cases, those subjects who either "survived" the program without experiencing the event (e.g., achievement of target clinical levels, hospitalization) or left the program prematurely, due to disenrollement from the health plan or program, or were lost to follow-up. Additionally, independent variables may be included in the model to help explain the variability in the outcome measure. In order to maximize the potential of this statistical method, validity of the model and research design must be assured. This paper reviews survival analysis as an alternative, and more appropriate, approach to evaluating DM program effectiveness than the current total population approach.

  17. Syracuse/NASA program: A historical critique: Multidisciplinary studies in management and development programs in the public sector

    Science.gov (United States)

    Barzelay, M. E.

    1974-01-01

    A historical critique is presented of the Syracuse/NASA program on management and development programs. Brief summaries are included of each of the major projects undertaken, including identification of the principal investigators and the university departments and disciplines involved.

  18. Program Manager: Journal of the Defense Systems Management College. Volume 23, Number 1, January-February 1994

    Science.gov (United States)

    1994-02-01

    Jones, Jr. PROGRAM MANAGER Managing Editor Esther M. Farria Art Director Greg Caruth Typography and Design Paula Croisetlere Program Manager (ISSN 0199...Company bombers to implement the strategic organization - President Clayton 1. Brukner commu- bombing doctrine. This would take all brand -new cre

  19. National Waste Terminal Storage Program Information Management Plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan is needed for the processing of the large amount of documentation that will accumulate in the National Waste Terminal Storage program over the next decade. The plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to external documentation from OWI organizations

  20. National waste terminal storage program: configuration management plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the Configuration Management Plan is to describe the Office of Waste Isolation's approach for the systematic identification, change control, status accounting, and auditing of: documents defining the NWTS Program and the plans for attaining the defined objectives; physical and functional characteristics of each storage site, facility, systems and equipment; and associated costs and schedules

  1. Beneficial role of conflict in radioactive waste management programs

    International Nuclear Information System (INIS)

    Payne, B.A.; Williams, R.G.

    1985-01-01

    Of the technical, political, and social problems associated with radioactive waste management, least is known about the latter two. Lay persons tend to generalize negative attitudes about other nuclear activity to radioactive waste management. Thus, conflict appears inevitable between the general public, citizen action groups, and decision-makers on radioactive waste management. The basis of conflict, we believe, can be found in the value orientation of certain groups and in differing perceptions of risk. Research on similar controversial issues reveals that conflict may be beneficial in the long run by contributing to the public's participation level and understanding of the issues, and to the decision-makers' appreciation of the lay perspective. The paper is in three parts. First, we review the sources of conflict over radioactive waste management issues. The negative attitudes and fears of the public toward different types of projects involving radioactivity, value conflicts, and differential perceptions of risk are cited as sources. Next we discuss the consequences of conflict in terms of sociological theory. Finally, we discuss how conflict can be directed and managed to produce an informed decision-making process. When the public is sensitized to an issue, when prevailing attitudes on the issue are negative, and when perceived risks are high - all of which are characteristic of waste management issues - specific steps should be taken to establish a legitimate process of communication and interaction between the public and the sponsor agency. When conflict is recognized as inevitable, the goal of a communications program is no longer to avoid it. It is to use the increased awareness to increase knowledge about waste management issues and public participation in decisions so that the final solution is acceptable at some level to all parties

  2. TU-AB-BRD-04: Development of Quality Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Thomadsen, B. [University of Wisconsin (United States)

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to

  3. TU-AB-BRD-04: Development of Quality Management Program

    International Nuclear Information System (INIS)

    Thomadsen, B.

    2015-01-01

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to

  4. Adaptive Management for Decision Making at the Program and Project Levels of the Missouri River Recovery Program

    Energy Technology Data Exchange (ETDEWEB)

    Thom, Ronald M.; Anderson, Michael G.; Tyre, Drew; Fleming, Craig A.

    2009-02-28

    The paper, “Adaptive Management: Background for Stakeholders in the Missouri River Recovery Program,” introduced the concept of adaptive management (AM), its principles and how they relate to one-another, how AM is applied, and challenges for its implementation. This companion paper describes how the AM principles were applied to specific management actions within the Missouri River Recovery Program to facilitate understanding, decision-making, and stakeholder engagement. For context, we begin with a brief synopsis of the Missouri River Recovery Program (MRRP) and the strategy for implementing adaptive management (AM) within the program; we finish with an example of AM in action within Phase I of the MRPP.

  5. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  6. Organizational attributes of practices successful at a disease management program.

    Science.gov (United States)

    Cloutier, Michelle M; Wakefield, Dorothy B; Tsimikas, John; Hall, Charles B; Tennen, Howard; Brazil, Kevin

    2009-02-01

    To assess the contribution of organizational factors to implementation of 3 asthma quality measures: enrollment in a disease management program, development of a written treatment plan, and prescription of severity-appropriate anti-inflammatory therapy. A total of 138 pediatric clinicians and 247 office staff in 13 urban clinics and 23 nonurban private practices completed questionnaires about their practice's organizational characteristics (eg, leadership, communication, perceived effectiveness, job satisfaction). 94% of the clinicians and 92% of the office staff completed questionnaires. When adjusted for confounders, greater practice activity and perceived effectiveness in meeting family needs were associated with higher rates of enrollment in the Easy Breathing program, whereas higher scores for 3 organizational characteristics--communication timeliness, decision authority, and job satisfaction--were associated with both higher enrollment and a greater number of written treatment plans. None of the organizational characteristics was associated with greater use of anti-inflammatory therapy. Three organizational characteristics predicted 2 quality asthma measures: use of a disease management program and creation of a written asthma treatment plan. If these organizational characteristics were amenable to change, then our findings could help focus interventions in areas of effective and acceptable organizational change.

  7. Framework for assessing causality in disease management programs: principles.

    Science.gov (United States)

    Wilson, Thomas; MacDowell, Martin

    2003-01-01

    To credibly state that a disease management (DM) program "caused" a specific outcome it is required that metrics observed in the DM population be compared with metrics that would have been expected in the absence of a DM intervention. That requirement can be very difficult to achieve, and epidemiologists and others have developed guiding principles of causality by which credible estimates of DM impact can be made. This paper introduces those key principles. First, DM program metrics must be compared with metrics from a "reference population." This population should be "equivalent" to the DM intervention population on all factors that could independently impact the outcome. In addition, the metrics used in both groups should use the same defining criteria (ie, they must be "comparable" to each other). The degree to which these populations fulfill the "equivalent" assumption and metrics fulfill the "comparability" assumption should be stated. Second, when "equivalence" or "comparability" is not achieved, the DM managers should acknowledge this fact and, where possible, "control" for those factors that may impact the outcome(s). Finally, it is highly unlikely that one study will provide definitive proof of any specific DM program value for all time; thus, we strongly recommend that studies be ongoing, at multiple points in time, and at multiple sites, and, when observational study designs are employed, that more than one type of study design be utilized. Methodologically sophisticated studies that follow these "principles of causality" will greatly enhance the reputation of the important and growing efforts in DM.

  8. 78 FR 32161 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2013-05-29

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... waste management program. We authorized the following revisions: Oklahoma received authorization for... authorization of its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management...

  9. 76 FR 62303 - California: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-10-07

    ... State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION... the revisions to California's hazardous waste management program shall be effective at 1 p.m. on... implement the RCRA hazardous waste management program. EPA granted authorization for changes to California's...

  10. 75 FR 76691 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... to the State of Oregon's federally authorized RCRA hazardous waste management program. On January 7... changes the State of Oregon made to its federally authorized RCRA Hazardous Waste Management Program...

  11. 77 FR 46964 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-08-07

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. The EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  12. 75 FR 918 - Oregon: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-01-07

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... hazardous waste management program under the Resource Conservation and Recovery Act, as amended (RCRA). On... has decided that the revisions to the Oregon hazardous waste management program satisfy all of the...

  13. 77 FR 29231 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-05-17

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. The EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  14. 76 FR 26616 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection Agency (EPA... (RCRA) allows EPA to authorize States to operate their hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  15. 77 FR 61326 - Indiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-10-09

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... RCRA hazardous waste management program. We granted authorization for changes to their program on... 202. Hazardous Waste Management July 30, 2003; 68 329 IAC 3.1-6-2(16); System; Identification and FR...

  16. 76 FR 37021 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-06-24

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... implement its base Hazardous Waste Management Program. We granted authorization for changes to their program... opportunity to apply for final authorization to operate all aspects of their hazardous waste management...

  17. Integrated Pest Management: A Curriculum for Early Care and Education Programs

    Science.gov (United States)

    California Childcare Health Program, 2011

    2011-01-01

    This "Integrated Pest Management Toolkit for Early Care and Education Programs" presents practical information about using integrated pest management (IPM) to prevent and manage pest problems in early care and education programs. This curriculum will help people in early care and education programs learn how to keep pests out of early…

  18. 20 CFR 435.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Purpose of financial and program management... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.20 Purpose of financial and program management. Sections 435.21 through 435.28 prescribe standards for...

  19. 24 CFR 84.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-04-01

    ... and Program Management § 84.20 Purpose of financial and program management. Sections 84.21 through 84.28 prescribe standards for financial management systems, methods for making payments and rules for... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Purpose of financial and program...

  20. 45 CFR 2543.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Purpose of financial and program management. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards for...

  1. 30 CFR 256.20 - Consideration of coastal zone management program.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Consideration of coastal zone management....20 Consideration of coastal zone management program. In the development of the leasing program, consideration shall be given to the coastal zone management program being developed or administered by an...

  2. 77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...

  3. Configuration Management Program Application at KNPP Units 5 and 6 Modernization Program

    International Nuclear Information System (INIS)

    Manchev, B.; Yordanova, V.; Nenkova, B.

    2006-01-01

    The need for Configuration Management Program development, became very clear after the initiation of the Modernization Program for Units 5and6, because KNPP personnel needed a good and safe way to control the huge amount of data which were transferred into two directions - input data (design and operational documents from KNPP to Contractors) and the design, vendor, procurement, etc. documents (from Contractors to KNPP). Moreover, most of the measures are in fact design changes and it appeared to be extremely important to track these design changes and their reflection into design and operational documents. It is even more important to obtain a successful transfer of all this information to the operating organization (EP-2) after the completion. The proposal for development of Configuration Management (CM) Program for KNPP Units 5and6 Modernization program was divided into three phases: 1. Information Control (Document Control and Records Management) 2.Technical Decision System (Change Control) 3. Master Equipment List (MEL), (as part of the Design requirements element) Information Control Element was chosen to be developed first. Implementation of Information Control element comprised of: Review and assessment of existing situation (procedures for document control and records Management), Development of new/revision of existing procedure for Document Control and Records Management, Development of SmartDoc software application in support of document control and records management and for measure documentation tracking (with its specifics), Data entry for MP5and6 measures, Implementation at EP-2 (with successful data migration from the existing databases). The SmartDoc development was completed at the end of 2002 and after a testing period it was implemented at Modernization and Investment Department first. Then the data for documents were transferred from the existing databases at EP-2 and the system was implemented at EP-2 and other KNPP facilities. Development

  4. Environmental Management 1995: Progress and plans of the Environmental Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  5. Application of plant life management program and experience at NRU

    International Nuclear Information System (INIS)

    Nickerson, J.; Dam, R.; Arnold, J.; See Hoye, D.

    2004-01-01

    The National Research Universal (NRU) reactor has seen extensive and excellent service since going into operation in 1957. During that time, significant investments in upgrading and improving the facility have been implemented. Recently, as part of the NRU Licenseability Extension (LE) program, AECL has developed a Plant Life Management (PLiM) program to support planned operation to at least 2012. The objective of the PLiM program is to systematically assess the various aging related degradation mechanisms in order to evaluate both current condition and the potential for further extending service life. Another objective is to identify the associated maintenance, surveillance and inspection strategy for service life extension of important Structures, Systems, and Components (SSCs). The strategy uses approaches that build on AECL's PLiM/PLEx experience at CANDU plants, but also utilizes previous Age Management and refurbishment work performed at NRU. The program is multi-faceted, systematic and integrated, and involves the facility operations organization in the assessment process. The PLiM program has used a number of pilot studies in the initial stages to test out PLiM procedures, gain experience with the various aging assessment techniques and enhance effectiveness of interfaces between the aging assessment team and the facility staff. The aging assessment process begins with the screening and prioritization of the facility SSCs. Selection of the appropriate assessment technique is based on priority and component type. Life and condition assessment techniques used at other plants have been adapted to NRU and performed on important components and structures. For important systems, a combination of condition assessment and systematic maintenance assessment techniques are being used. Detailed PLiM procedures have been developed and are in trial use in pilot studies. These procedures are currently being updated with the experience gained during the pilot studies. In

  6. An Analysis of Earned Value Management Implementation Within the F-22 System Program Office's Software Development

    National Research Council Canada - National Science Library

    Dibert, John C; Velez, John C

    2006-01-01

    .... Acquisition Category ID programs like the US Air Force F-22 fighter program use EVM to manage their software development efforts, but has the program's implementation of EVM followed the industry...

  7. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  8. Chemistry research for the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Vikis, A.C.; Garisto, F.; Lemire, R.J.; Paquette, J.; Sagert, N.H.; Saluja, P.P.S.; Sunder, S.; Taylor, P.

    1988-01-01

    This publication reviews chemical research in support of the Canadian Nuclear Fuel Waste Management Program. The overall objective of this research is to develop the fundamental understanding required to demonstrate the suitability of waste immobilization media and processes, and to develop the chemical information required to predict the long-term behaviour of radionuclides in the geosphere after the waste form and the various engineered barriers containing it have failed. Key studies towards the above objective include experimental and theoretical studies of uranium dioxide oxidation/dissolution; compilation of thermodynamic databases and an experimental program to determine unavailable thermodynamic data; studies of hydrothermal alteration of minerals and radionuclide interactions with such minerals; and a study examining actinide colloid formation, as well as sorption of actinides on groundwater colloids

  9. Oil spill research program, U. S. Minerals Management Service

    International Nuclear Information System (INIS)

    LaBelle, R. P.; Mullin, J. V.; White, A. C.

    1997-01-01

    The oil spill prevention and response research program of the U.S. Minerals Management Service was described including its goals and objectives, some recently funded projects, and future research directions. As it is now the trend in most research organizations, a large part of the program is carried out in cooperation with other major research centers to leverage funds and to maximize study results. For example, joint research with Environment Canada focuses on the physical and chemical properties of dispersants, remote sensing and mapping oil slicks and shoreline cleanup strategies. Similarly, cooperative projects are underway with the National Institute of Standards and Technology in assessing the capabilities of in-situ burning as an oil spill response tool. Research capabilities of OHMSETT - The National Oil Spill Response Test Facility were also reviewed. A series of tables listed titles of research projects completed during 1995-1996. 5 tabs.,

  10. The Savannah River Site Waste Inventory Management Program

    International Nuclear Information System (INIS)

    Griffith, J.M.; Holmes, B.R.

    1995-01-01

    Each hazardous and radioactive waste generator that delivers waste to Savannah River Site (SRS) treatment, storage and disposal (TSD) facilities is required to implement a waste certification plan. The waste certification process ensures that waste has been properly identified, characterized, segregated, packaged, and shipped according to the receiving facilities waste acceptance criteria. In order to comply with the rigid acceptance criteria, the Reactor Division developed and implemented the Waste Inventory Management Program (WIMP) to track the generation and disposal of low level radioactive waste. The WIMP system is a relational database with integrated barcode technology designed to track the inventory radioactive waste. During the development of the WIMP several waste minimization tools were incorporated into the design of the program. The inclusion of waste minimization tools as part of the WIMP has resulted in a 40% increase in the amount of waste designated as compactible and an overall volume reduction of 5,000 cu-ft

  11. Geoscience research for the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Whitaker, S.H.

    1987-01-01

    The Canadian Nuclear Fuel Waste Management Program is assessing the concept of deep disposal of nuclear fuel waste in plutonic rock. As part of that assessment, a broad program of geoscience and geotechnical work has been undertaken to develop methods for characterizing sites, incorporating geotechnical data into disposal facility design, and incorporating geotechnical data into environmental and safety assessment of the disposal system. General field investigations are conducted throughout the Precambrian Shield, subsurface investigations are conducted at designated field research areas, and in situ rock mass experiments are being conducted in an Underground Research Laboratory. Samples from the field research areas and elsewhere are subjected to a wide range of tests and experiments in the laboratory to develop an understanding of the physical and chemical processes involved in ground-water-rock-waste interactions. Mathematical models to simulate these processes are developed, verified and validated. 114 refs.; 13 figs

  12. 75 FR 45583 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-03

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... authorized hazardous waste program which is set forth in the regulations entitled ``Approved State Hazardous Waste Management Programs'', New York's authorized hazardous waste program. EPA will incorporate by...

  13. 77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... Federal Register, the EPA is codifying and incorporating by reference the State's hazardous waste program...

  14. 76 FR 6594 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S...

  15. 77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...

  16. Aquatic Plant Management Program current status and seasonal workplan

    Energy Technology Data Exchange (ETDEWEB)

    Burns, E.R.; Bates, A.L.; Webb, D.H.

    1993-07-01

    The objective of the TVA Aquatic Plant Management Program is to support in an environmentally and economically responsible manner, the balanced multiple uses of the water resource of the Tennessee Valley. This is accomplished by following an integrated approach to prevent introduction and spread of noxious species, documenting occurrence and spread of existing species, and suppressing or eliminating problems in designated high use areas. It is not the TVA objective, nor is it biologically feasible and prudent to eliminate all aquatic vegetation. Aerial photography, helicopter reconnaissance, and field surveys are used to assess distributions and abundance of various aquatic macrophytes. Water level fluctuations are supplemented by herbicide applications to control undesirable vegetation. Investigations are conducted to evaluate water level fluctuation schemes, as well as biological, mechanical, and alternative chemical control techniques which offer potential for more environmentally compatible and cost-effective management operations.

  17. Associative programming language and virtual associative access manager

    Science.gov (United States)

    Price, C.

    1978-01-01

    APL provides convenient associative data manipulation functions in a high level language. Six statements were added to PL/1 via a preprocessor: CREATE, INSERT, FIND, FOR EACH, REMOVE, and DELETE. They allow complete control of all data base operations. During execution, data base management programs perform the functions required to support the APL language. VAAM is the data base management system designed to support the APL language. APL/VAAM is used by CADANCE, an interactive graphic computer system. VAAM is designed to support heavily referenced files. Virtual memory files, which utilize the paging mechanism of the operating system, are used. VAAM supports a full network data structure. The two basic blocks in a VAAM file are entities and sets. Entities are the basic information element and correspond to PL/1 based structures defined by the user. Sets contain the relationship information and are implemented as arrays.

  18. The driving elements of an integrated configuration management program

    International Nuclear Information System (INIS)

    Zaalouk, M.G.

    1990-01-01

    The need for an effective long term Plant Configuration Management Program (CMP) has been demonstrated in response to Plant Design Modification and Plant Life Extension activities. Having particular need are those Utilities operating early vintage nuclear plants, where numerous modifications have been made without the benefit of an accurate, complete, properly maintained and controlled Design Basis. This paper presents a model for a long term, cost effective CMP which is based on and driven by the development, maintenance and control of accurate plant Design Basis Information. The model also provides a systematic approach for devising and implementing an integrated Plant CMP based on the essential attributes of the Plant Configuration Management, including Design Basis

  19. Introducing Knowledge Management in Study Program of Nuclear Engineering

    International Nuclear Information System (INIS)

    Pleslic, S.

    2012-01-01

    to introduce concept of knowledge management in study program of nuclear engineering to prepare future nuclear professionals on adequate actions.(author).

  20. Who should pay for demand-side management programs?

    International Nuclear Information System (INIS)

    Flaim, T.

    1992-01-01

    Traditional utility resource planning involves taking the load forecast as a given and then determining the additional supply resources expected to serve that load at minimum cost and optimal levels of reliability. With integrated planning, the goal is still to balance supply and demand, but in a way that is most cost effective given all possible ways to serve customers' energy service needs. The new element in integrated resource planning is demand side management (DSM) or activities aimed at altering the quantity of energy customers use and/or the timing of their consumption. This paper discusses how DSM works to accomplish energy conservation and how it affects the rate structure. It also goes on to discuss how a utility can optimize the participation in a conservation program so that no particular group might have to carry the brunt of a rate increase. These suggestions include aligning rates to accurately reflect marginal costs; require participating customers to pay as many program costs as are possible; where participating customers can't pay full cost of a program, restrict costs to those groups who are eligible to participate; and offer a 'reverse shared-savings' program to the largest customers. The paper goes on to discuss electric-to-gas fuel switching and what customers should carry the cost burden for this type of switching