WorldWideScience

Sample records for phase planning today

  1. Strategic planning: today's hot buttons.

    Science.gov (United States)

    Bohlmann, R C

    1998-01-01

    The first generation of mergers and managed care hasn't slowed down group practices' need for strategic planning. Even groups that already went through one merger are asking about new mergers or ownership possibilities, the future of managed care, performance standards and physician unhappiness. Strategic planning, including consideration of bench-marking, production of ancillary services and physician involvement, can help. Even if only a short, general look at the future, strategic planning shows the proactive leadership needed in today's environment.

  2. Strategic Planning and Doctor Of Nursing Practice Education: Developing Today's and Tomorrow's Leaders.

    Science.gov (United States)

    Falk, Nancy L; Garrison, Kenneth F; Brown, Mary-Michael; Pintz, Christine; Bocchino, Joseph

    2015-01-01

    Strategic planning and thinking skills are essential for today's nurse leaders. Doctor of nursing practice (DNP) programs provide an opportunity for developing effective nurse strategists. A well-designed strategy course can stimulate intellectual growth at all levels of Bloom's Taxonomy. Discussion forums in online education provide new opportunities for rich interaction among peers en route to development of well-informed strategic plans. An interprofessional perspective adds a rich and vital aspect to doctoral nursing education and it serves to inform strategic plan development. A roadmap for teaching strategic planning to current and future nursing leaders will guide the integration of essential content into DNP programs.

  3. Phase-based Planning for Railway Infrastructure Projects

    DEFF Research Database (Denmark)

    Li, Rui

    2017-01-01

    is important in terms of economy and rail operations. This study presents two types of Phase-based Decision Support System (PDSS), i.e. Functional Phase-Based Planning Approach (F-PBPA) and Process-Oriented Phase-Based Planning Approach (PO-PBPA). They are used for decision support for the planning...... of the railway infrastructure maintenance activities at the strategic planning level. The objective is to achieve better economy, as well as improve cost efficiency. F-PBPA consists of ve main phases: Data Collection, Technical Optimization (TeO), Economic Optimization (EcO), Constrained Optimization (Co...... the costs. Finally, constrained optimization (CoO) includes additional constraints and it allows the railway expert to adjust input parameters, thereby to obtain alternative maintenance plans. PO-PBPA contains another systematic phase based process. With a focus on Life Cycle Cost (LCC), PO-PBPA can guide...

  4. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  5. TWRS Privatization Phase 1 Master Site Plan

    International Nuclear Information System (INIS)

    PARAZIN, R.J.

    1999-01-01

    The U.S. Department of Energy (DOE) has chosen to accomplish the Tank Waste Remediation System disposal mission via privatization. The disposal mission has been divided into two privatization phases. Phase I, a 'proof of concept' phase, will establish and demonstrate the technical, commercial, and procurement capabilities necessary far privatization to proceed. Once established, privatization will be expanded in the form of a second phase (Phase II) to dispose of the remainder of the tank waste. In conjunction with preparation of the Tank Waste Remediation System (TWRS) Privatization Request for Proposals (RFP)(RL, 1996), a location was selected for the Phase I demonstration facilities (Shord, 1996). The location selected was the area previously developed and characterized for the Grout Disposal Site, adjoining the 200 East Area. The site is of sufficient size for a Private Contractor (PC) to carry out pretreatment, immobilization, and vitrification operations and possesses the required characteristics (e.g., close to feed tanks) to best facilitate the Phase I operations. This overall long-range Master Site Plan (MSP) has been developed to establish a ''baseline'' for the (TWRS) Privatization Phase I (TPPI) PC Site. The MSP depicts the planned layout for the PC Site along with various interfaces between the site and other Hanford utilities and functions. The complete integration of TPPl MSP with overall Hanford Site planning process will assist in establishing the PC site and the necessary priorities to meet the Hanford cleanup mission. The MSP has been developed systematically into a comprehensive, safe, flexible, logical and cost-effective plan. The general philosophy behind the preparation of a MSP for the TPPl program is that it will serve as a single source documentation of the planning for the development of the TPPl complex. The effort will plan temporary and permanent land use, utilities, and traffic flow for the overall program. It will identify needs

  6. 42 CFR 137.20 - What is required during the planning phase?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What is required during the planning phase? 137.20... Participation in Self-Governance Planning Phase § 137.20 What is required during the planning phase? The planning phase must be conducted to the satisfaction of the Indian Tribe and must include: (a) legal and...

  7. Nexus: Planning Tomorrow, Today

    Science.gov (United States)

    Jaap, John; Meyer, Patrick

    2005-01-01

    To prepare for future human space flight programs, the Mission Operations Laboratory (MOL) at the Marshall Space Flight Center (MSFC) has been investigating new planning and scheduling paradigms. To support and prove this investigation, MOL technologists have developed a working prototype of a scheduling system to support the new paradigms. The new planning and scheduling system is called Nexus and has a web site at http://nexus.nasa.gov/. Nexus is based on a comprehensive modeling schema to capture all scheduling requirements typical to human space missions, an incremental scheduling engine tailored to the modeling schema, and remote access (including Personal Data Assistant (PDA) access) to the scheduling system. This paper describes the proposed paradigm shift and the enabling software. It also describes a typical Nexus demonstration which emphasizes how it works, how it enables the paradigm shift, and possible applications. Demonstrations include access to the full functionally of Nexus from a personal computer and access to limited functionally via a PDA. An appendix includes a description and screen shots of the demonstrations.

  8. Phase Planning for Overall Copper-Fiber Switch-over

    DEFF Research Database (Denmark)

    Gutierrez Lopez, Jose Manuel; Jensen, Michael; Andreasen, Morten Henius

    2013-01-01

    This paper introduces a phase planning concept to the imminent copper-fiber switch-over action. Traditional copper loops are to be replaced by modern fiber lines in order to keep up with the current evolution of data communications. This work proposes two novel approaches of how to schedule...... this transition by systematically selecting the most attractive areas, in terms of economic efficiency, to be upgraded first. These are alternatively based on 1) distance to the access point and 2)population density, and the overall plan is divided into three phases. In both cases the final network solution...... is the same, but the different prioritization on what areas to upgrade first implies a different distribution of the investment over the deployment period. Two case studies using real geographical data in Denmark show these differences, and the results suggest that planning the phases based on population...

  9. TWRS phase I privatization site environmental baseline and characterization plan

    International Nuclear Information System (INIS)

    Shade, J.W.

    1997-01-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan

  10. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria

  11. Transuranic (TRU) Waste Phase I Retrieval Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    1999-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A', the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-I13 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval scenario similar to those used for TRU drum retrieval at LANL and SRS. Phase I retrieval consists of the activities associated with the assessment of approximately 10,000 55-gallon drums of suspect TRU-waste in burial ground 218-W-4C and the retrieval of those drums verified to contain TRU waste. Four of the trenches in 218-W-4C (Trenches 1,4,20, and 29) are prime candidates for Phase I retrieval because they contain large numbers of suspect TRU drums, stacked from 2 to 5 drums high, on an asphalt pad. In fact, three of the trenches (Trenches 1,20, and 29) contain waste that has not been covered with soil, and about 1500 drums can be retrieved without excavation. The other three trenches in 218-W-4C (Trenches 7, 19, and 24) are not candidates for Phase I retrieval because they contain significant numbers of boxes. Drums will be retrieved from the four candidate trenches, checked for structural integrity, overpacked, if necessary, and assayed at the burial

  12. Transuranic (TRU) Waste Phase I Retrieval Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    2000-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval scenario similar to those used for TRU drum retrieval at LANL and SRS. Phase I retrieval consists of the activities associated with the assessment of approximately 10,000 55-gallon drums of suspect TRU-waste in burial ground 218-W-4C and the retrieval of those drums verified to contain TRU waste. Four of the trenches in 218-W-4C (Trenches 1, 4, 20, and 29) are prime candidates for Phase I retrieval because they contain large numbers of suspect TRU drums, stacked from 2 to 5 drums high, on an asphalt pad. In fact, three of the trenches (Trenches 1 , 20, and 29) contain waste that has not been covered with soil, and about 1500 drums can be retrieved without excavation. The other three trenches in 218-W-4C (Trenches 7, 19, and 24) are not candidates for Phase I retrieval because they contain significant numbers of boxes. Drums will be retrieved from the four candidate trenches, checked for structural integrity, overpacked, if necessary, and assayed at the burial

  13. 105-N Basin sediment disposition phase-one sampling and analysis plan

    International Nuclear Information System (INIS)

    1997-01-01

    The sampling and analysis plan (SAP) for Phase 1 of the 105-N Basin sediment disposition project defines the sampling and analytical activities that will be performed for the engineering assessment phase (phase 1) of the project. A separate SAP defines the sampling and analytical activities that will be performed for the characterization phase (Phase 2) of the 105-N sediment disposition project. The Phase-1 SAP is presented in the introduction (Section 1.0), in the field sampling plan (FSP) (Section 2.0), and in the quality assurance project plan (QAPjP) (Section 3.0). The FSP defines the sampling and analytical methodologies to be performed. The QAPjP provides information on the quality assurance/quality control (QA/QC) parameters related to the sampling and analytical methodologies. This SAP defines the strategy and the methods that will be used to sample and analyze the sediment on the floor of the 105-N Basin. The resulting data will be used to develop and evaluate engineering designs for collecting and removing sediment from the basin

  14. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  15. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria

  16. Framework for Railway Phase-based Planning

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Nielsen, Otto Anker

    spending) to evaluate the project alternatives. The comparison result can identify the most cost-efficient solution in a long run and therefore reduce the overall costs. This article defines a phase-based framework to guide the railway maintenance and renewal project planning at strategic level....... The framework evaluates the project options from a larger LCC scope: The costs from train operation companies and passengers, together with the maintenance and renewal costs from Infrastructure Managers are included in the calculation. The framework simplifies the planning processes and the LCC calculation...... and compared. A case study is introduced in the article to demonstrate how the framework works to compare timber sleepers and concrete sleepers from strategic planning level. Two Life Cycle Cost oriented policies are discussed to illustrate: high quality track is necessity to improve the cost efficiency...

  17. Disposal phase experimental program plan

    International Nuclear Information System (INIS)

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes

  18. Science and Math Lesson Plans to Meet the Ohio Revised Science Standards and the Next Generation of Standards for Today; Technology (Excel

    Directory of Open Access Journals (Sweden)

    Suzanne Lunsford

    2015-02-01

    Full Text Available Pre-service teachers (K-12 developed and taught lesson plans that met the state and national science and technology standards by integrating Excel and PowerPoint into their lesson. A sample of 74 pre-service teachers in our science education program were required to integrate technology (Excel as they developed science and math lesson plans with graphing as a requirement. These students took pre-test and post-test (n=74 to determine their understanding of Excel in relation to the need of current technology for todays' science classroom. The test results showed that students obtained content gains in Excel graphing in all the inquiry-based lab experiments. They also gained experience in developing math skills, inquiry-based science lesson plans, and communication and presentation skills.

  19. Transuranic (TRU) Waste Phase I Retrieval Plan

    CERN Document Server

    McDonald, K M

    2000-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval ...

  20. Engineering Environment for Production System Planning in Small and Medium Enterprises

    OpenAIRE

    Goerzig, David; Lucke, Dominik; Lenz, Juergen; Denner, Timo; Lickefett, Michael; Bauernhansl, Thomas

    2015-01-01

    Today, factories have to be adapted permanently in order to follow the developments towards fast changing customer demands and faster life cycles of products. Key aspects to cope with these developments are the reduction of the unit costs and the planning duration as well as the improvement of the planning quality. In order to overcome these challenges, digital tools can support all phases of factory and process planning. Most of them provide a wide range of functionalities, which require a l...

  1. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  2. Test phase plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) has prepared this Test Phase Plan for the Waste Isolation Pilot Plant to satisfy the requirements of Public Law 102-579, the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA). The Act provides seven months after its enactment for the DOE to submit this Plan to the Environmental Protection Agency (EPA) for review. A potential geologic repository for transuranic wastes, including transuranic mixed wastes, generated in national-defense activities, the WIPP is being constructed in southeastern New Mexico. Because these wastes remain radioactive and chemically hazardous for a very long time, the WIPP must provide safe disposal for thousands of years. The DOE is developing the facility in phases. Surface facilities for receiving waste have been built and considerable underground excavations (2150 feet below the surface) that are appropriate for in-situ testing, have been completed. Additional excavations will be completed when they are required for waste disposal. The next step is to conduct a test phase. The purpose of the test phase is to develop pertinent information and assess whether the disposal of transuranic waste and transuranic mixed waste in the planned WIPP repository can be conducted in compliance with the environmental standards for disposal and with the Solid Waste Disposal Act (SWDA) (as amended by RCRA, 42 USC. 6901 et. seq.). The test phase includes laboratory experiments and underground tests using contact-handled transuranic waste. Waste-related tests at WIPP will be limited to contact-handled transuranic and simulated wastes since the LWA prohibits the transport to or emplacement of remote-handled transuranic waste at WIPP during the test phase

  3. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  4. 78 FR 5165 - First Phase of the Forest Planning Process for the Bio-Region

    Science.gov (United States)

    2013-01-24

    ... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio... initiating the first phase of the forest planning process for the Bio-Region. SUMMARY: Come gather 'round... phase of the Bio-Regional Assessment has begun. DATES: The Bio-Regional Assessment Report will be...

  5. Phase Transitions in Planning Problems: Design and Analysis of Parameterized Families of Hard Planning Problems

    Science.gov (United States)

    Hen, Itay; Rieffel, Eleanor G.; Do, Minh; Venturelli, Davide

    2014-01-01

    There are two common ways to evaluate algorithms: performance on benchmark problems derived from real applications and analysis of performance on parametrized families of problems. The two approaches complement each other, each having its advantages and disadvantages. The planning community has concentrated on the first approach, with few ways of generating parametrized families of hard problems known prior to this work. Our group's main interest is in comparing approaches to solving planning problems using a novel type of computational device - a quantum annealer - to existing state-of-the-art planning algorithms. Because only small-scale quantum annealers are available, we must compare on small problem sizes. Small problems are primarily useful for comparison only if they are instances of parametrized families of problems for which scaling analysis can be done. In this technical report, we discuss our approach to the generation of hard planning problems from classes of well-studied NP-complete problems that map naturally to planning problems or to aspects of planning problems that many practical planning problems share. These problem classes exhibit a phase transition between easy-to-solve and easy-to-show-unsolvable planning problems. The parametrized families of hard planning problems lie at the phase transition. The exponential scaling of hardness with problem size is apparent in these families even at very small problem sizes, thus enabling us to characterize even very small problems as hard. The families we developed will prove generally useful to the planning community in analyzing the performance of planning algorithms, providing a complementary approach to existing evaluation methods. We illustrate the hardness of these problems and their scaling with results on four state-of-the-art planners, observing significant differences between these planners on these problem families. Finally, we describe two general, and quite different, mappings of planning

  6. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  7. Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled

  8. Gallium-cladding compatibility testing plan. Phases 1 and 2: Test plan for gallium corrosion tests. Revision 2

    International Nuclear Information System (INIS)

    Wilson, D.F.; Morris, R.N.

    1998-05-01

    This test plan is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water-Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. The plan summarizes and updates the projected Phases 1 and 2 Gallium-Cladding compatibility corrosion testing and the following post-test examination. This work will characterize the reactions and changes, if any, in mechanical properties that occur between Zircaloy clad and gallium or gallium oxide in the temperature range 30--700 C

  9. Women in engineering conference: capitalizing on today`s challenges

    Energy Technology Data Exchange (ETDEWEB)

    Metz, S.S.; Martins, S.M. [eds.

    1996-06-01

    This document contains the conference proceedings of the Women in Engineering Conference: Capitalizing on Today`s Challenges, held June 1-4, 1996 in Denver, Colorado. Topics included engineering and science education, career paths, workplace issues, and affirmative action.

  10. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  11. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP's disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II

  12. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  13. Horonobe underground research laboratory project. The plan for the in-situ experiments in Phase 2 and Phase 3 in/around URL

    International Nuclear Information System (INIS)

    Matsui, Hiroya

    2005-09-01

    This report describes for preliminary research plan in Phase 2 and Phase 3 taken into consideration of expected geological environment at location of URL based on the results of the investigations until FY 2003/2004. Duration of construction phase and total cost are considered as important factors for planning as well. The below items are planned for in-situ experiments in Phase 2 and Phase 3 in/around URL are planning. Phase 2. (In-situ experiments for understanding of geological environment) Geological survey at tunnel. Inflow measurement in shafts. Water pressure monitoring and groundwater sampling around shafts during excavation of URL. Investigation for EDZ around shafts. Stress measurement on support. Detail investigations for geological environment around drifts. Excavation disturbance experiment in a drift. Investigation for desaturation zone and REDOX condition around drifts. (Engineered barrier system) In-situ experiment on low-alkali concrete. In-situ experiment for gas migration in engineering barrier system. Phase 3. (In-situ experiments for understanding of geological environment) EDZ experiment for stress interference. Investigation of long-term behavior of EDZ around drifts. Detail investigation on fault/fault zone. Monitoring for the change of geological environment at earthquake. Backfill test in boreholes. (Engineered barrier system) T-H-M-C experiment. In-situ experiment for corrosion of overpack. Investigation of the influence of a concrete to engineering barrier system and geological environment. In-situ experiment for interference between backfill material and geological environment. Backfill test in a drift. (Safety assessment) Tracer tests in engineering barrier system, natural barrier and fault/fault zone. (author)

  14. 25 CFR 1000.50 - What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase requirements? 1000.50 Section 1000.50 Indians OFFICE OF THE...) Planning and Negotiation Grants Advance Planning Grant Funding § 1000.50 What must a Tribe/Consortium...

  15. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  16. 78 FR 8104 - First Phase of the Forest Planning Process for the Bio-Region; Correction

    Science.gov (United States)

    2013-02-05

    ... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio-Region; Correction AGENCY: USDA, Forest Service. ACTION: Notice; correction. SUMMARY: The Department of... rule entitled First Phase of the Forest Planning Process for the Bio-Region. The document contained...

  17. Nuclear-piping-repair planning today needs skill, organization

    International Nuclear Information System (INIS)

    O'Keefe, W.

    1986-01-01

    Nuclear power plant piping continues to experience failures and imminent threat of failure, despite a high level of care in design, analysis, fabrication, or installation. Continual inspection and surveillance and letter-by-letter following of procedures are not completely effective remedies, either. Both short-time-frame accidents and slowly progressing insidious complaints have caused loss of capacity, availability, and even confidence that the unit will work at close-to-expected performance. The fixes for nuclear-piping complaints cover a wide span, from mere carrying out of well-known repair procedures on either small scale or large, all the way to highly engineered solutions to a problem, with months of study and analysis followed by weighing of alternative methods. With some of the problems, little special planning is necessary. The repair is understood, and the time it needs is well within the envelope of a scheduled outage. Radiation exposure of personnel will not exceed expected moderate limits. And if the repair is a repeat performance of a recent similar one, little can go wrong. The planning for many other repairs, however, is so essential that even a minor failing in it will bring a debacle, with over-run, losses in revenue, and senseless expenditure of man-rems. Look at two types of planning for nuclear piping repair, as revealed at a recent American Welding Society conference on maintenance welding in nuclear power plants

  18. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  19. Space Weather Action Plan Solar Radio Burst Phase 1 Benchmarks and the Steps to Phase 2

    Science.gov (United States)

    Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Love, J. J.; Pierson, J.

    2017-12-01

    Solar radio bursts, when at the right frequency and when strong enough, can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The benchmark team has developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks, the basis used to derive them, and the limitations of that work. We will also discuss the work that needs to be done to complete the phase 2 benchmarks.

  20. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Science.gov (United States)

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  1. A strategic plan for the second phase (2013-2015) of the Korea biobank project.

    Science.gov (United States)

    Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee

    2013-04-01

    The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the

  2. Planning documents: a business planning strategy.

    Science.gov (United States)

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  3. Test Plan: Phase 1, Hanford LLW melter tests, GTS Duratek, Inc

    International Nuclear Information System (INIS)

    Eaton, W.C.

    1995-01-01

    This document provides a test plan for the conduct of vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384215] is GTS Duratek, Inc., Columbia, Maryland. The GTS Duratek project manager for this work is J. Ruller. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a DuraMelter trademark vitrification system

  4. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...

  5. A Robust Flare Planning Logic for Unmanned Aerial Vehicle Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Aurora Flight Sciences proposes to develop a flare planning methodology that would provide aircraft guidance during this critical phase of flight. The algorithms...

  6. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  7. Natural family planning in today's world.

    Science.gov (United States)

    1990-07-01

    Diminished involvement on the part of the major pharmaceutical firms in contraceptive research calls for renewed attention to the potential of natural methods of family planning. At present, these methods can demand a period of sexual abstinence as long as 17 days/month to be effective; however, Carl Djerassi has asserted that this period can be reduced by more than 50% with improved measurement of biochemical changes. Rising levels of estrogens and saliva or urine might be used in place of luteinizing hormone to predict ovulation. Similarly, increasing levels of progesterone early postovulation and the second rise in estrogens could serve as markers that there is no longer a risk of conception. Progesterone levels could be assayed in urine through use of monoclonal antibodies. Also needed are nonhormonal biochemical indicators of ovarian function. Ultimately, increases in knowledge of ovarian follicular physiology is likely to lead to more reliable markers of ovulation that estradiol. The need will remain, however, to monitor several days during each menstrual cycle given fluctuations from cycle to cycle in the same individual. The phenomenon of vast numbers of women in developing countries who are postponing childbearing until their latest late 30s is a further impetus for more serious consideration of natural alternatives to be hormonal fertility control.

  8. A Robust Flare Planning Logic for Unmanned Aerial Vehicle Applications, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Aurora Flight Sciences proposes to develop a flare planning logic that would provide aircraft guidance during this critical phase of flight. The algorithms that...

  9. The Ernst & Young Business Plan Guide

    CERN Document Server

    Ford, Brian R; Pruitt, Patrick T; Young, Ernst

    2010-01-01

    In today's competitive business environment, a well thought out business plan is more important than ever before. Not only can it assist you in raising the money needed to start or expand a business-by attracting the interest of potential investors-but it can also help you keep tabs on your progress once the business is up and running.Completely revised and updated to reflect today's dynamic business environment, The Ernst & Young Business Plan Guide, Third Edition leads you carefully through every aspect involved in researching, writing, and presenting a winning business plan. Illustrating ea

  10. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  11. Initial research on planning and design of today's Buddhist temple

    Institute of Scientific and Technical Information of China (English)

    Xinjian LI; Guangya ZHU

    2008-01-01

    Starting from the reconstruction planning for the Chongyuan Temple in Suzhou Industrial Park, the planners explored the elements of contemporary Buddhism architecture planning and design in terms of the social multi-requirement, environmental utilization fitted for a given time and place, appropriate temple pat-tern on specification and institution, functional division for harmonic relationship between monks and laymen, etc. For realization of historic mission: carrying forward the cultural tradition and constructing harmonic society, this paper proposes some principles of creation, which have historical evidence and are keeping pace with the times.

  12. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  13. Test Plan: Phase 1 demonstration of 3-phase electric arc melting furnace technology for vitrifying high-sodium content low-level radioactive liquid wastes

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, W.C. [ed.

    1995-05-31

    This document provides a test plan for the conduct of electric arc vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384216] is the US Bureau of Mines, Department of the Interior, Albany Research Center, Albany, Oregon. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes feed preparation activities and melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a 3-phase electric arc (carbon electrode) furnace.

  14. Test Plan: Phase 1 demonstration of 3-phase electric arc melting furnace technology for vitrifying high-sodium content low-level radioactive liquid wastes

    International Nuclear Information System (INIS)

    Eaton, W.C.

    1995-01-01

    This document provides a test plan for the conduct of electric arc vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384216] is the US Bureau of Mines, Department of the Interior, Albany Research Center, Albany, Oregon. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes feed preparation activities and melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a 3-phase electric arc (carbon electrode) furnace

  15. Ozone-depleting-substance control and phase-out plan

    International Nuclear Information System (INIS)

    Nickels, J.M.; Brown, M.J.

    1994-07-01

    Title VI of the Federal Clean Air Act Amendments of 1990 requires regulation of the use and disposal of ozone-depleting substances (ODSs) (e.g., Halon, Freon). Several important federal regulations have been promulgated that affect the use of such substances at the Hanford Site. On April 23, 1993, Executive Order (EO) 12843, Procurement Requirements and Policies for Federal Agencies for Ozone-Depleting Substances (EPA 1993) was issued for Federal facilities to conform to the new US Environmental Protection Agency (EPA) regulations implementing the Clean Air Act of 1963 (CAA), Section 613, as amended. To implement the requirements of Title VI the US Department of Energy, Richland Operations Office (RL), issued a directive to the Hanford Site contractors on May 25, 1994 (Wisness 1994). The directive assigns Westinghouse Hanford Company (WHC) the lead in coordinating the development of a sitewide comprehensive implementation plan to be drafted by July 29, 1994 and completed by September 30, 1994. The implementation plan will address several areas where immediate compliance action is required. It will identify all current uses of ODSs and inventories, document the remaining useful life of equipment that contains ODS chemicals, provide a phase-out schedule, and provide a strategy that will be implemented consistently by all the Hanford Site contractors. This plan also addresses the critical and required elements of Federal regulations, the EO, and US Department of Energy (DOE) guidance. This plan is intended to establish a sitewide management system to address the clean air requirements

  16. Transmission Network Expansion Planning Considering Phase-Shifter Transformers

    Directory of Open Access Journals (Sweden)

    Celso T. Miasaki

    2012-01-01

    Full Text Available This paper presents a novel mathematical model for the transmission network expansion planning problem. Main idea is to consider phase-shifter (PS transformers as a new element of the transmission system expansion together with other traditional components such as transmission lines and conventional transformers. In this way, PS are added in order to redistribute active power flows in the system and, consequently, to diminish the total investment costs due to new transmission lines. Proposed mathematical model presents the structure of a mixed-integer nonlinear programming (MINLP problem and is based on the standard DC model. In this paper, there is also applied a specialized genetic algorithm aimed at optimizing the allocation of candidate components in the network. Results obtained from computational simulations carried out with IEEE-24 bus system show an outstanding performance of the proposed methodology and model, indicating the technical viability of using these nonconventional devices during the planning process.

  17. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  18. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  19. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  20. Academic librarianship today

    CERN Document Server

    2017-01-01

    Intended for use by both librarians and students in LIS programs, Academic Librarianship Today is the most current, comprehensive overview of the field available today. Key features include: Each chapter was commissioned specifically for this new book, and the authors are highly regarded academic librarians or library school faculty— or both Cutting-edge topics such as open access, copyright, digital curation and preservation, emerging technologies, new roles for academic librarians, cooperative collection development and resource sharing, and patron-driven acquisitions are explored in depth Each chapter ends with thought-provoking questions for discussion and carefully constructed assignments that faculty can assign or adapt for their courses The book begins with Gilman’s introduction, an overview that briefly synthesizes the contents of the contributors’ chapters by highlighting major themes. The main part of the book is organized into three parts: The Academic Library Landscape Today, ...

  1. Energy supply today and tomorrow, national and global

    International Nuclear Information System (INIS)

    Ott, G.

    2003-01-01

    A status report about 'Energy Supply Today and Tomorrow, National and Global' focuses mainly on global aspects. Today's world energy consumption is dominated by more than 80% of fossil sources of energy followed by so-called non-commercial energies, such as wood and plant and animal wastes, contributing 10%; nuclear power, 7%; and hydroelectric power, 2%. The development of energy consumption until the middle of this century will continue to be driven by the further growth of the world population, and by the need to meet the rising demand for energy in the developing countries. Because of their availability and flexible uses, oil, natural gas, and coal as fossil sources of energy will continue to meet a considerable share of the requirement. The use of nuclear power, a source meeting all criteria, such as safety, waste management, and competitiveness, is both justifiable and desirable. Restrictive decisions about nuclear power taken today must not impair the freedom of choice of future generations. Using renewable energies is just as desirable as increasing energy efficiency; however, the technical and physical potentials available for this purpose should not be overrated. This makes it imperative to protect the supply of energy 'in this difficult interim phase' with all the options available, and to open up prospects for the future, also by conducting the appropriate energy and environmental research. The balance between continuity of supply, environmental compatibility, and competitiveness must be taken into account in this effort. In the second half of the 21 st century, it is possible that energy consumption will stabilize when the world's population ceases to grow. New technologies, some of which may not even be known today or may still be under development, could then pave the way for an energy supply system which, in toto, would be less of a burden on the environment. (orig.)

  2. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  3. Hepatic arterial phase and portal venous phase computed tomography for dose calculation of stereotactic body radiation therapy plans in liver cancer: a dosimetric comparison study

    International Nuclear Information System (INIS)

    Xiao, Jianghong; Li, Yan; Jiang, Qingfeng; Sun, Lan; Henderson Jr, Fraser; Wang, Yongsheng; Jiang, Xiaoqin; Li, Guangjun; Chen, Nianyong

    2013-01-01

    To investigate the effect of computed tomography (CT) using hepatic arterial phase (HAP) and portal venous phase (PVP) contrast on dose calculation of stereotactic body radiation therapy (SBRT) for liver cancer. Twenty-one patients with liver cancer were studied. HAP, PVP and non-enhanced CTs were performed on subjects scanned in identical positions under active breathing control (ABC). SBRT plans were generated using seven-field three-dimensional conformal radiotherapy (7 F-3D-CRT), seven-field intensity-modulated radiotherapy (7 F-IMRT) and single-arc volumetric modulated arc therapy (VMAT) based on the PVP CT. Plans were copied to the HAP and non-enhanced CTs. Radiation doses calculated from the three phases of CTs were compared with respect to the planning target volume (PTV) and the organs at risk (OAR) using the Friedman test and the Wilcoxon signed ranks test. SBRT plans calculated from either PVP or HAP CT, including 3D-CRT, IMRT and VMAT plans, demonstrated significantly lower (p <0.05) minimum absorbed doses covering 98%, 95%, 50% and 2% of PTV (D98%, D95%, D50% and D2%) than those calculated from non-enhanced CT. The mean differences between PVP or HAP CT and non-enhanced CT were less than 2% and 1% respectively. All mean dose differences between the three phases of CTs for OARs were less than 2%. Our data indicate that though the differences in dose calculation between contrast phases are not clinically relevant, dose underestimation (IE, delivery of higher-than-intended doses) resulting from CT using PVP contrast is larger than that resulting from CT using HAP contrast when compared against doses based upon non-contrast CT in SBRT treatment of liver cancer using VMAT, IMRT or 3D-CRT

  4. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  5. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    International Nuclear Information System (INIS)

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts

  6. Final Report for Phase II Study: Prototyping the Sketch Planning Visualization Tool for Non-Motorized Travel

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Ho-Ling [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Daniel W [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Reuscher, Tim [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chin, Shih-Miao [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Taylor, Rob D [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2014-02-01

    To further examine how factors such as those identified from the Phase I NMT study, and the modeling framework developed under that effort could be applied to local/regional level planning activities, FHWA decided to pursue a Phase II study. It was determined that a small geographic area with more detailed local data would be necessary. Although Washington D.C. was not one of the 2009 NHTS add-ons, it did conduct a household travel survey of 11,000 households in 2007-2008. The National Capital Region Transportation Planning Board at the Metropolitan Washington Council of Governments (MWCOG) conducted the household travel survey. The data coverage under the MWCOG survey is much higher than that of the NHTS. As a part of the Phase II study, a prototype of a Geographic Information System (GIS)-based sketch planning visualization tool was also to be developed. The intent was to use a neighborhood in the Washington D.C. region as a case study for this prototype application.

  7. House of tomorrow today

    NARCIS (Netherlands)

    Lichtenberg, J.J.N.; Ham, M.; Hensen, J.L.M.

    2011-01-01

    The House of Tomorrow Today is a project focussing on a healthy, energy producing dwelling to be realized with today¿s proven technology. The project aims at an energy plus level based on the principles as formulated in SmartBuilding (Slimbouwen) [1] ActiveHouse [2] and HoTT [3] It can be seen as

  8. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  9. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  10. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  11. Einstein today

    International Nuclear Information System (INIS)

    Aspect, A.; Grangier, Ph.; Bouchet, F.R.; Brunet, E.; Derrida, B.; Cohen-Tannoudji, C.; Dalibard, J.; Laloe, F.; Damour, Th.; Darrigol, O.; Pocholle, J.P.

    2005-01-01

    The most important contributions of Einstein involve 5 fields of physics : the existence of quanta (light quanta, stimulated radiation emission and Bose-Einstein condensation), relativity, fluctuations (Brownian motion and thermodynamical fluctuations), the basis of quantum physics and cosmology (cosmological constant and the expansion of the universe). Diverse and renowned physicists have appreciated the development of modern physics from Einstein's ideas to the knowledge of today. This book is a collective book that gathers their work under 7 chapters: 1) 1905, a new beginning; 2) from the Einstein, Podolsky and Rosen's article to quantum information (cryptography and quantum computers); 3) the Bose-Einstein condensation in gases; 4) from stimulated emission to the today's lasers; 5) Brownian motion and the fluctuation-dissipation theory; 6) general relativity; and 7) cosmology. (A.C.)

  12. Information services today an introduction

    CERN Document Server

    Hirsh, Sandra

    2015-01-01

    This essential overview of what it means to be a library and information professional today provides a broad overview of the transformation of libraries as information organizations, why these organizations are more important today than ever before, the technological influence on how we provide information resources and services in today's digital and global environment, and the various career opportunities available for information professionals. The book begins with a historical overview of libraries and their transformation as information and technology

  13. Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation

    International Nuclear Information System (INIS)

    1994-03-01

    This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU

  14. Kilowatt isotope power system, Phase II Plan. Volume IV. Teledyne FSCD vs GDS

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-15

    This Volume contains Teledyne's input to the Kilowatt Isotope Power System Phase II Plan. Included is a description of the Flight System Heat Generation System, Flight System Radiator, Thermal Insulation Stability, GDS Heat Generation System and GDS Radiator.

  15. How Does This All End? Campaign Planning, Phase Transitions, and Conflict Termination in Iraq

    National Research Council Canada - National Science Library

    Goss, Thomas

    2008-01-01

    .... The political issue of how OIF ends is inherently wrapped up in the military issues of campaign planning, desired end-states, centers of gravity, and operational phase transitions in the Iraqi War...

  16. The Evolution of Phase Zero Shaping and Interagency Integration in Combatant Commander Campaign Planning

    National Research Council Canada - National Science Library

    Chatham, Anthony P

    2007-01-01

    Shaping is an evolving concept. Although it has been added to campaign planning as described in the campaign phasing model, the doctrine fails to adequately define shaping as a distinct category of activities...

  17. Righting Your Future: LRE Lesson Plans for Today and Tomorrow.

    Science.gov (United States)

    CRADLE: Center for Research and Development in Law-Related Education, Winston-Salem, NC.

    A compilation of more than 50 lesson plans on law related education, these materials were written by middle school and high school teachers from around the United States. The lessons cover a broad range of topics including "DNA Fingerprints and the Constitutional Right to Privacy"; "Censorship and Book Banning in Public Schools"; "The Death…

  18. Horonobe Underground Research Laboratory Project. Plans for surface-based investigations. Phase 1

    International Nuclear Information System (INIS)

    Goto, Junichi; Hama, Katsuhiro

    2003-10-01

    The Horonobe Underground Research Laboratory Project is an investigation project which is planned over 20 years. The investigations are conducted in the three phases: investigations from surface (Phase 1), investigations during construction of the underground facility (Phase 2) and investigations using the facility (Phase 3). Taking into account the results from 'H12: Project of Establish the Scientific and Technical Basis for HLW Disposal in Japan - Second Progress Report on Research and Development for the Geological Disposal of HLW in Japan-' (JNC, 2000), research and development goals for the Horonobe URL project were re-defined as follows; a) Development of investigation technologies for the geological environment, b) Development of monitoring technologies for the geological environment, c) Study on the long-term stability of the geological environment, d) Development of the basis for engineering technologies in deep underground, e) Verification of technologies for engineered barriers, f) Development of detailed designing technologies of the repositories, and g) Improvement of safety assessment methodologies. Investigations for the goals a) to d) and e) to g) are conducted in the 'Geoscientific Research' and 'Research and Development on Geological Disposal', respectively. In Phase 1, a 'laboratory construction area' of a few kilometers square is selected based on the results from early stage investigations. Subsequent investigations are concentrated in the selected area and its periphery. Acquisition of data by surface-based investigations, modeling of the geological environment and predictions of changes in the geological environment caused by the construction of the underground facility, are conducted in a) Development of investigation technologies for the geological environment. Development and installation of monitoring equipments and data acquisition prior to the construction of the underground facility fall under b) Development of monitoring technologies

  19. Fermilab Today

    Science.gov (United States)

    registration due today Women's Initiative: "Guiltless: Work/Life Balance" - Aug. 13 Nominations for ; -Leah Hesla In Brief Women's Initiative presents 'Guiltless: Work-Life Balance' - Thursday in One West Cowperthwaite-O'Hagan present "Guiltless: Work-Life Balance" on Thursday, Aug. 13, at 3 p.m. in One

  20. Horonobe Underground Research Laboratory project. Plans of investigations during shaft and drift excavation (Construction of underground facilities: Phase II)

    International Nuclear Information System (INIS)

    2005-06-01

    Horonobe Underground Research Laboratory Project is planned for over 20 years to establish the scientific and technical basis for the underground disposal of high-level radioactive wastes in Japan. The investigations are conducted by JNC in three phases, from the surface (Phase I), during the construction of the underground facilities (Phase II), and using the facilities (Phase III). This report concerns the investigation plans for Phase II. During excavation of shafts and drifts, detailed geological and borehole investigation will be conducted and the geological model constructed in Phase I is evaluated and revised by newly acquired data of geophysical and geological environment. Detailed in-situ experiments, as well as the effects of shaft excavation, are also done to study long-term changes, rock properties, groundwater flow and chemistry to ensure the reliability of repository technology and establish safety assessment methodology. (S. Ohno)

  1. Gallium-cladding compatibility testing plan: Phase 3: Test plan for centrally heated surrogate rodlet test. Revision 2

    International Nuclear Information System (INIS)

    Morris, R.N.; Baldwin, C.A.; Wilson, D.F.

    1998-07-01

    The Fissile Materials Disposition Program (FMDP) is investigating the use of weapons grade plutonium in mixed oxide (MOX) fuel for light-water reactors (LWR). Commercial MOX fuel has been successfully used in overseas reactors for many years; however, weapons derived fuel may differ from the previous commercial fuels because of small amounts of gallium impurities. A concern presently exists that the gallium may migrate out of the fuel, react with and weaken the clad, and thereby promote loss of fuel pin integrity. Phases 1 and 2 of the gallium task are presently underway to investigate the types of reactions that occur between gallium and clad materials. This is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. This Plan summarizes the projected Phase 3 Gallium-Cladding compatibility heating test and the follow-on post test examination (PTE). This work will be performed using centrally-heated surrogate pellets, to avoid unnecessary complexities and costs associated with working with plutonium and an irradiation environment. Two sets of rodlets containing pellets prepared by two different methods will be heated. Both sets will have an initial bulk gallium content of approximately 10 ppm. The major emphasis of the PTE task will be to examine the material interactions, particularly indications of gallium transport from the pellets to the clad

  2. The transition of new technology to solve today`s problems

    Energy Technology Data Exchange (ETDEWEB)

    Kamin, R.A. [Naval Air Warfare Center, Trenton, NJ (United States); Martin, C.J.; Turner, L.M. [Defense Fuel Supply Center, Alexandria, VA (United States)

    1995-05-01

    Extensive research has been conducted in the development of methods to predict the degradation of F-44 in storage. The Low Pressure Reactor (LPR) has greatly enhanced the stability prediction capabilities necessary to make informed decisions concerning aviation fuel in storage. This technique has in the past been primarily used for research purposes. The Naval Air Warfare Center, Aircraft Division, Trenton, NJ, has used this technique successfully to assist the Defense Fuel Supply Center, Cameron Station, Alexandria, VA, in stability assessments of F-44. The High Performance Liquid Chromatography/Electrochemical Detector (HPLC/EC) antioxidant determination technique has also aided in making stability predictions by establishing the amount of inhibitor currently in the product. This paper will address two case studies in which the above new technology was used to insure the rapid detection and diagnosis of today`s field and logistic problems.

  3. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  4. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  5. Tough Times: Strategic Planning as a War Canoe

    Science.gov (United States)

    Seymour, Daniel

    2011-01-01

    In this article, the author discusses how to make strategic planning a more valuable tool for higher education in today's tough times. Strategic planning is really the answer to five straightforward questions. The first three represent the plan itself, while the last two are what makes the plan vital and dynamic: (1) Why do we exist?; (2) What do…

  6. Conceptual plan: Two-Phase Flow Laboratory Program for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Howarth, S.M.

    1993-07-01

    The Salado Two-Phase Flow Laboratory Program was established to address concerns regarding two-phase flow properties and to provide WIPP-specific, geologically consistent experimental data to develop more appropriate correlations for Salado rock to replace those currently used in Performance Assessment models. Researchers in Sandia's Fluid Flow and Transport Department originally identified and emphasized the need for laboratory measurements of Salado threshold pressure and relative permeability. The program expanded to include the measurement of capillary pressure, rock compressibility, porosity, and intrinsic permeability and the assessment of core damage. Sensitivity analyses identified the anhydrite interbed layers as the most likely path for the dissipation of waste-generated gas from waste-storage rooms because of their relatively high permeability. Due to this the program will initially focus on the anhydrite interbed material. The program may expand to include similar rock and flow measurements on other WIPP materials including impure halite, pure halite, and backfill and seal materials. This conceptual plan presents the scope, objectives, and historical documentation of the development of the Salado Two-Phase Flow Program through January 1993. Potential laboratory techniques for assessing core damage and measuring porosity, rock compressibility, capillary and threshold pressure, permeability as a function of stress, and relative permeability are discussed. Details of actual test designs, test procedures, and data analysis are not included in this report, but will be included in the Salado Two-Phase Flow Laboratory Program Test Plan pending the results of experimental and other scoping activities in FY93

  7. Gas development plan - Lithuania

    International Nuclear Information System (INIS)

    1993-10-01

    A detailed description of the plan for the development of gas utilization in Lithuania is presented. The plan is subdivided under the headings of gas supply, gas demand, gas transmission and distribution, economy and the organization of the gas sector in the country. The first phase of the project has been undertaken by a Danish firm in cooperation with the Lithuanian firm Lietuvos Dujos. The first aim was to clarify the problems that will arise in connection with this joint venture on developing the use of gas in Lithuania, focusing on existing gas supply and market conditions, the current flow control and metering and economic constraints. The organization of the gas sector in the country as it stands today is described and possible models for its future organization are discussed in addition to a strategy of implementation. Possible development trends are outlined and maximum/minimum demand scenarios are suggested. Subjects and areas related to the gas sector in Lithuania are identified for further investigation in the next phase. It is stated that Lithuania is at present undergoing a fast transformation towards a market economy and that the transfer of foreign currency has been liberalized. Only the pipeline from Minsk to Vilnius is open at present and provides the total supply of natural gas to Lithuania and Kalingrad, controlled by the Russian gas company, Lentransgas, on the basis of a gas purchase agreement regulated on a yearly basis. Other possible supply sources are the Danish part of the North Sea and the Norwegian offshore fields. (AB)

  8. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  9. Towards More Nuanced Classification of NGOs and Their Services to Improve Integrated Planning across Disaster Phases

    Directory of Open Access Journals (Sweden)

    Vivian L. Towe

    2017-11-01

    Full Text Available Nongovernmental organizations (NGOs are being integrated into U.S. strategies to expand the services that are available during health security threats like disasters. Identifying better ways to classify NGOs and their services could optimize disaster planning. We surveyed NGOs about the types of services they provided during different disaster phases. Survey responses were used to categorize NGO services as core—critical to fulfilling their organizational mission—or adaptive—services implemented during a disaster based on community need. We also classified NGOs as being core or adaptive types of organizations by calculating the percentage of each NGO’s services classified as core. Service types classified as core were mainly social services, while adaptive service types were those typically relied upon during disasters (e.g., warehousing, food services, etc.. In total, 120 NGOs were classified as core organizations, meaning they mainly provided the same services across disaster phases, while 100 NGOs were adaptive organizations, meaning their services changed. Adaptive NGOs were eight times more likely to report routinely participating in disaster planning as compared to core NGOs. One reason for this association may be that adaptive NGOs are more aware of the changing needs in their communities across disaster phases because of their involvement in disaster planning.

  10. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    Science.gov (United States)

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  11. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  12. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  13. TWRS privatization: Phase I monitoring well engineering study and decommissioning plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, B.A.

    1996-09-11

    This engineering study evaluates all well owners and users, the status or intended use of each well, regulatory programs, and any future well needs or special purpose use for wells within the TWRS Privatization Phase I demonstration area. Based on the evaluation, the study recommends retaining 11 of the 21 total wells within the demonstration area and decommissioning four wells prior to construction activities per the Well Decommissioning Plan (WHC-SD-EN-AP-161, Rev. 0, Appendix I). Six wells were previously decommissioned.

  14. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  15. Opinions of forest administration chief officers in Artvin Regional Directorate of Forestry about preparation and application phases of forest management plans

    Directory of Open Access Journals (Sweden)

    Rahmi Yılma

    2016-10-01

    Full Text Available In this study, based on the example of Artvin Regional Directorate of Forestry, it is aimed to display the viewpoints of forest administration chief officers as regards planning who are the basic elements of interest groups and who implement plans, determine their opinions about the problems they encounter during preparation and application phases of plans, and develop solution proposals. Within this study a survey was performed with 31 forest administration chief officers in Artvin Regional Directorate of Forestry. According to the survey results, at planning phase it has been seen that participatory processes are put into force, certain criteria and indicators are adopted in differentiating between forest functions at inventory stage, which were also taken into consideration during planning, and in particularly stand parameters were determined accurately. Also during planning phase, it is believed that, endemic, rare and endangered targeted plant and wild animal species are evaluated, whereas non-wood forest types suffer from a lack of evaluation. In addition, it was concluded that lack or insufficiency of silviculture plans, the size of forest administration chiefdom and relations problems between forest administration and local people were being experienced. By integrating other interest groups to planning process, widening the scope of the sudty and realizing similar studies in different regional directorates of forestry, we can determine common points and differences and by this way new strategies can be developed.

  16. Acute social stress before the planning phase improves memory performance in a complex real life-related prospective memory task.

    Science.gov (United States)

    Glienke, Katharina; Piefke, Martina

    2016-09-01

    Successful execution of intentions, but also the failure to recall are common phenomena in everyday life. The planning, retention, and realization of intentions are often framed as the scientific concept of prospective memory. The current study aimed to examine the influence of acute stress on key dimensions of complex "real life" prospective memory. To this end, we applied a prospective memory task that involved the planning, retention, and performance of intentions during a fictional holiday week. Forty healthy males participated in the study. Half of the subjects were stressed with the Socially Evaluated Cold Pressor Test (SECPT) before the planning of intentions, and the other half of the participants underwent a control procedure at the same time. Salivary cortisol was used to measure the effectiveness of the SECPT stress induction. Stressed participants did not differ from controls in planning accuracy. However, when we compared stressed participants with controls during prospective memory retrieval, we found statistically significant differences in PM across the performance phase. Participants treated with the SECPT procedure before the planning phase showed improved prospective memory retrieval over time, while performance of controls declined. Particularly, there was a significant difference between the stress and control group for the last two days of the holiday week. Interestingly, control participants showed significantly better performance for early than later learned items, which could be an indicator of a primacy effect. This differential effect of stress on performance was also found in time- and event-dependent prospective memory. Our results demonstrate for the first time, that acute stress induced before the planning phase may improve prospective memory over the time course of the performance phase in time- and event-dependent prospective memory. Our data thus indicate that prospective memory can be enhanced by acute stress. Copyright © 2016

  17. Neutrinos today

    International Nuclear Information System (INIS)

    Pontecorvo, B.; Bilen'kij, S.

    1987-01-01

    After the famous 1983 discovery of intermediate W, Z 0 bosons it may be stated with certainty that W, Z 0 are entirely responsible for the production of neutrinos and for their interactions. Neutrino physics notions are presented from this point of view in the first four introductory, quite elementary, paragraphs of the paper. The following seven paragraphs are more sophisticated. They are devoted to the neutrino mass and neutrino mixing question, which is the most actual problem in today neutrino physics. Vacuum neutrino oscillations, matter neutrino oscillations and netrinoless double-decay are considered. Solar neutrino physics is discussed in some detail from the point of view of vacuum and matter neutrino oscillations. The role played by neutrinos in the Universe is briefly considered. In the last paragraph there discussed the probable observation by different groups of neutrinos connected with the Supernova 1987 A: the first observation of gravitational star collapse (at least the general rehearsal of such observation) opens up a new era in astronomy of today exerimental physics and astrophysics is presented at the end of the paper in the form of a Table

  18. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  19. Church and art: from the second Vatican Council to today

    Directory of Open Access Journals (Sweden)

    Mauro Mantovani

    2014-12-01

    Full Text Available This text deals with the relationship between the Catholic Church and art from the Second Vatican Council to today. For this reason it considers some of the most important interventions about art by recent popes (Montini - Paul VI; Wojtyła - John Paul II; Ratzinger - Benedict XVI, Bergoglio - Francis also mentioning some activities that the Holy See is currently promoting. These pages are intended to offer a contribution, mainly theoretical, for those who are working in the field of the planning and promotion of artistic and cultural events, especially if these events are related to religious heritage.

  20. FROM PAST TILL TODAY AZERBAIJANIAN MUSIC

    Directory of Open Access Journals (Sweden)

    Hatira Ahmedli CAFER

    2015-09-01

    Full Text Available Ancient Azerbaijanian music was found after archelogical excavations. In the first literature The Book of Dede Korkut, then in Nizami's and Fuzuli's literal works a vast of information could be found about the Medieval Age music. The first phase of Azerbaijanian musical history contains arts of bards, laters phases contains classical modes. The researches of Azerbaijanian modes extend to the Medieval Age. The expand of 19th century European music affected Azerbaijanian culture, too. The early years of 20th century is reckoned as a new rising period in Azerbaijanin music. Uzeyir Hacibeyov composed Leyli and Majnun in that period which was the first opera of the East. Meanwhile, several musical high schools, conservatories, symphony orchestras, national instrumental orchestras, and theatres were established. The smphonic music which was established in 1920's had a major development in between 1940 and 1960. In between 1960 and 1980, younger generation, too, participated in artistic activities, alongside the older generation. In 1988-1994 Armenians invaded Karabagh and commited several genocides which some of the most known are called 20 January and Khojaly genocides. In that period, Azerbaijanian composes divided into three stages as 20 January, Karabagh, and Khojaly. Today, Azerbaijanian music is well known all over the world, while being played in lots of festivals in the whole world.

  1. The third stage of hospital long-range planning: the marketing approach.

    Science.gov (United States)

    Rynne, T J

    1980-01-01

    Today most hospital administrators are convinced they should implement long-range planning. The marketing approach to long-range planning is an effective strategy that is consumer oriented. It starts the planning process with the consumer, letting the consumer's needs and wants guide the organization's planning.

  2. Action plan to counteract soil acidification and to promote sustainable use of forest land

    International Nuclear Information System (INIS)

    2002-04-01

    -year phase of research and method development is both essential and sufficient for obtaining robust criteria for selection of suitable or unsuitable areas, and tools for planning and coordination, e.g., with liming of surface waters. Further, the Board proposes that research and method development into adaptation of silviculture in areas suffering from acidification are initiated and that recommendations are elaborated during this 3-year preparatory phase. The subsequent operative part of the countermeasures, when most of the practical spreading will occur is estimated to take about 10 years. The cost of the 3-year preparatory phase is estimated to be 90 million SEK, plus the cost of the operative phase, which is between 430 and 750 million SEK for the entire 10-year period. The Board of Forestry proposes that the state is responsible for these costs. The lakes and waterways liming programme costs about 210 million SEK annually and today is financed to about 93% by the state and otherwise mainly by individual municipalities. The action plan also aims to improve the conditions for sustainable utilisation of forest land in connection with removal of forest biofuel. The National Board of Forestry is positive to the use of biofuel but considers that measures in the form of follow-ups and extension should be introduced in order to speed up and stimulate the development with regard to nutrient compensation for biomass removal, including whole tree harvest. The cost of the actual nutrient compensation is expected, as formerly, to be dealt with by the actors on the market without financial assistance from the state. On the other hand, the National Board of Forestry proposes that the follow-up and extension inputs are started within the framework of the action plan and thereby obtain state financing. The action plan contributes directly to fulfilment of the national environmental goals 'Only natural acidification', 'Living lakes and waterways' and 'Living forests'. The plan also

  3. Phase estimation in optical interferometry

    CERN Document Server

    Rastogi, Pramod

    2014-01-01

    Phase Estimation in Optical Interferometry covers the essentials of phase-stepping algorithms used in interferometry and pseudointerferometric techniques. It presents the basic concepts and mathematics needed for understanding the phase estimation methods in use today. The first four chapters focus on phase retrieval from image transforms using a single frame. The next several chapters examine the local environment of a fringe pattern, give a broad picture of the phase estimation approach based on local polynomial phase modeling, cover temporal high-resolution phase evaluation methods, and pre

  4. Connected minds technology and today's learners

    CERN Document Server

    Pedrò, Francesc

    2012-01-01

    In all OECD countries, digital media and connectedness are integral to the lives of todays learners. It is often claimed that these learners are ""new millennium learners"", or ""digital natives"", who have different expectations about education. This book contributes to the debate about the effects of technology attachment and connectedness on todays learners, and their expectations about teaching. The book sets out to answer the following questions: Can the claim that todays students are ""new millenium learners"" or ""digital natives be sustained empirically? Is there consistent research evidence demonstrating the effects of technology on cognitive development, social values, and learning expectations? What are the implications for educational policy and practice?

  5. 105-F and DR Phase 1 Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    Curry, L.R.

    1998-06-01

    This SAP presents the rationale and strategy for characterization of specific rooms within the 105-F and 105-DR reactor buildings. Figures 1-1 and 1-2 identify the rooms that are the subject of this SAP. These rooms are to be decontaminated and demolished as an initial step (Phase 1 ) in the Interim Safe Storage process for these reactors. Section 1.0 presents the background and sites history for the reactor buildings and summarizes the data quality objective process, which provides the logical basis for this SAP. Preliminary surveys indicate that little radiochemical contamination is present. Section 2.0 presents the quality assurance project plan, which includes a project management structure, sampling methods and quality control, and oversight of the sampling process. Section 2.2.1 summarizes the sampling methods, reflecting the radiological and chemical sampling designs presented in Tables 1-17 and 1-18. Section 3.0 presents the Field Sampling Plan for Phase 1. The sampling design is broken into two stages. Stage 1 will verify the list of radioactive constituents of concern and generate the isotopic distribution. The objectives of Stage 2 are to estimate the radionuclide inventories of room debris, quantify chemical contamination, and survey room contents for potential salvage or recycle. Table 3-1 presents the sampling activities to be performed in Stage 1. Tables 1-17 and 1-18 identify samples to be collected in Stage 2. Stage 2 will consist primarily of survey data collection, with fixed laboratory samples to be collected in areas showing visible stains. Quality control sampling requirements are presented in Table 3-2

  6. German risk study, phase (DRS-B)

    International Nuclear Information System (INIS)

    Werner, W.

    1992-01-01

    The first risk investigations were primarily intended to estimate the risk of accidents in nuclear power plants and to compare it with other natural risk and civilization risks. The American reactor safety study WASH 1400 and the German risk study phase A (DRS-A) gave a detailed analyses of the offsite consequences of accidents, especially the magnitude and frequency of health damage for the population. Risk investigations today are primarily used to examine the design of safety systems and to further develop the entire safety concept. Safety investigations have shown that nuclear power plants still possess safety reserves if safety systems do not operate as planned. These safety reserves can be exploited in the sense of a further development of safety by plant internal emergency measures. One purpose of risk analyses is to identify such measures and to evaluate their feasibility and effectiveness. The most important goals of the investigations in DRS-B were: Identification of vulnerabilities and possible safety improvements; determination of safety reserves during accident sequences exceeding the design limits; evaluation of plant internal emergency measures. Thus, goals in phase B compared with phase A have changed from investigations of the magnitude of damage to detailed analysis of the plant systems response under accident conditions. The magnitude of possible fission product releases is also determined in phase B. However, no new accident consequence calculations are performed. Figs and tabs

  7. Mathematics Teaching Today

    Science.gov (United States)

    Martin, Tami S.; Speer, William R.

    2009-01-01

    This article describes features, consistent messages, and new components of "Mathematics Teaching Today: Improving Practice, Improving Student Learning" (NCTM 2007), an updated edition of "Professional Standards for Teaching Mathematics" (NCTM 1991). The new book describes aspects of high-quality mathematics teaching; offers a model for observing,…

  8. Efficiency of two-phase methods with focus on a planned population-based case-control study on air pollution and stroke

    Directory of Open Access Journals (Sweden)

    Strömberg Ulf

    2007-11-01

    Full Text Available Abstract Background We plan to conduct a case-control study to investigate whether exposure to nitrogen dioxide (NO2 increases the risk of stroke. In case-control studies, selective participation can lead to bias and loss of efficiency. A two-phase design can reduce bias and improve efficiency by combining information on the non-participating subjects with information from the participating subjects. In our planned study, we will have access to individual disease status and data on NO2 exposure on group (area level for a large population sample of Scania, southern Sweden. A smaller sub-sample will be selected to the second phase for individual-level assessment on exposure and covariables. In this paper, we simulate a case-control study based on our planned study. We develop a two-phase method for this study and compare the performance of our method with the performance of other two-phase methods. Methods A two-phase case-control study was simulated with a varying number of first- and second-phase subjects. Estimation methods: Method 1: Effect estimation with second-phase data only. Method 2: Effect estimation by adjusting the first-phase estimate with the difference between the adjusted and unadjusted second-phase estimate. The first-phase estimate is based on individual disease status and residential address for all study subjects that are linked to register data on NO2-exposure for each geographical area. Method 3: Effect estimation by using the expectation-maximization (EM algorithm without taking area-level register data on exposure into account. Method 4: Effect estimation by using the EM algorithm and incorporating group-level register data on NO2-exposure. Results The simulated scenarios were such that, unbiased or marginally biased ( Conclusion In the setting described here, method 4 had the best performance in order to improve efficiency, while adjusting for varying participation rates across areas.

  9. Succession planning : phase II.

    Science.gov (United States)

    2008-06-01

    Succession planning is an organizational investment in the future. Institutional : knowledge is a critical ingredient in the culture of an organization, and its intangible : value becomes significant when an organization is faced with the need to pas...

  10. Preface: Catalysis Today

    DEFF Research Database (Denmark)

    Li, Yongdan

    2016-01-01

    This special issue of Catalysis Today with the theme “Sustain-able Energy” results from a great success of the session “Catalytic Technologies Accelerating the Establishment of Sustainable and Clean Energy”, one of the two sessions of the 1st International Symposium on Catalytic Science and Techn...

  11. Educational Entrepreneurship Today

    Science.gov (United States)

    Hess, Frederick M., Ed.; McShane, Michael Q., Ed.

    2016-01-01

    In "Educational Entrepreneurship Today", Frederick M. Hess and Michael Q. McShane assemble a diverse lineup of high-profile contributors to examine the contexts in which new initiatives in education are taking shape. They inquire into the impact of entrepreneurship on the larger field--including the development and deployment of new…

  12. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan

    International Nuclear Information System (INIS)

    G. L. Schwendiman

    2006-01-01

    This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition

  13. Planning for Office Automation.

    Science.gov (United States)

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  14. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  15. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    International Nuclear Information System (INIS)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  16. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  17. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  18. Perfectionism in students and positive career planning attitudes

    OpenAIRE

    Stoeber, Joachim; Mutinelli, Sofia; Corr, Philip J.

    2016-01-01

    In today's uncertain job market, university students who show positive attitudes in their career planning have an advantage. Yet, we know little what personality characteristics are associated with individual differences in career planning attitudes. The present study examined 177 university students to investigate whether perfectionism (self-oriented, other-oriented, and socially prescribed) predicted students' positive career planning attitudes (career adaptability, career optimism, and per...

  19. Telecommunications network modelling, planning and design

    CERN Document Server

    Evans, Sharon

    2003-01-01

    Telecommunication Network Modelling, Planning and Design addresses sophisticated modelling techniques from the perspective of the communications industry and covers some of the major issues facing telecommunications network engineers and managers today. Topics covered include network planning for transmission systems, modelling of SDH transport network structures and telecommunications network design and performance modelling, as well as network costs and ROI modelling and QoS in 3G networks.

  20. Business plan competition

    CERN Multimedia

    2007-01-01

    "Venture – Companies for tomorrow" is a business plan competition, which supports students and other junior entrepreneurs in developing their business plans. The sixth edition of the competition is now taking place. Venture 2008 highlights: - prize money totalling CHF 150’000; - possibility to optimize business ideas and business plans with the help of experienced coaches: around 200 coaches are available, with a wide range of backgrounds, entrepreneurs as well as venture capitalists; -\tpossibility to present business ideas and business plans to potential investors ("Investor Days" - 17 January and 7 May); - active involvement in the start-up community; -\tcontribution to potential independence. The competition consists of two phases: Phase I, Business idea, Deadline for submission of business idea: 5 December 2007 (online at http://www.venture.ch). Award Ceremony: 17 January 2008 Phase II, Business plan Deadline for submission of business plan: 2 April 2008 (online at...

  1. COGEMA: yesterday, today, tomorrow

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    CEA's 100%-owned subsidiary Cogema was set up in July 1966. 1979 was satisfactory and 1980 looks promising. Cogema is involved in all the phases of the nuclear fuel cycle except for the manufacture of the fuel itself, a gap that it is planning to fill. Cogema's discovery of the Coutras deposit in the Gironde is 'the good news' of the year. Work on the Eurodif uranium enrichment plant at Tricastin is almost finished and by the end of 1981 it will be operating at its full capacity of 10,8 million SWU. On the processing side, work on expanding existing facilities has begun (UP2 800 and UP3). In 1985 La Hague's foreign clients UP2 will process 1,200 tons and UP3 6000 tons [fr

  2. Analyzing an Integrated Planning Approach Among Planning Scale and Sector a Case Study of Malang City's Vision as the City of Education

    OpenAIRE

    Amirudin, Akhmad; Fefta Wijaya, Andy; Yossomsakdi, Samrit

    2014-01-01

    Integrated planning is more needed by government today because of the complexity of problems and limited resources. Integrated planning can undertake the problems by giving comprehensive solution and provide how much resources are needed to reach the goal. Integrated planning approach is implied to provide better tools to guide actions towards the development of cities, improvement of human conditions, and ultimately a better urbanism. So the research focused on integrated planning in Malang ...

  3. ICT Strategic Planning for Mazandaran Province

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Shojaie

    2012-02-01

    Full Text Available Today, regarding rapid changes in the environment, any organization, institution or country that overlooks its capabilities, strengths and weaknesses, will face real challenges. Strategic planning in organizations is a common response to these challenges which also facilitate achieving goals in an organization. Today, the importance of ICT is increased, which necessitates ICT strategic planning to use ICT in organizations. So, this study aimed to propose ICT strategic plans for Mazandaran province. For this end, at first using stakeholders' viewpoints, the vision, mission and goals are provided. Then, Internal & External Matrix was suggested and identified factors were ranked using Analytic Network Processing (ANP. Then, concerning strengths, weaknesses, opportunities, threats, and using SWOT analysis, ICT strategies were provided. Finally, using QSPM matrix, the strategies were ranked. Regarding this ranking, dedicated budget to ICT in governmental organizations, using integration architecture, developing organizational and inter-organizational information systems, developing mechanisms to absorb national and local financial resources for extending ICT infrastructures and finally concerning ICT trainings for managers and people, were in the top of the list.

  4. An overview of trends in distribution network planning: A movement towards smart planning

    DEFF Research Database (Denmark)

    You, Shi; Bindner, Henrik W.; Hu, Junjie

    2014-01-01

    Distribution network planning, historically known as a ‘predict and provide’ process, seeks to determine a set of optimal network solutions for supplying electric demands spatially distributed over a geographic area. Today, the rapid development and deployment of distributed generation and smart...... grid products (e.g., control, communication, and new economic measures) call for urgent improvements in distribution network planning to allow the utilities to proactively modernize their existing distribution grids. This paper reviews the current practices in this area and the emerging trends towards...

  5. Approval plans issues and innovations

    CERN Document Server

    Katz, Linda S

    2013-01-01

    How can you, as an acquisition librarians, keep current on the output of hundreds of publishers? The answer, of course, is that you cannot. For over 30 years, approval plans have been used by librarians to acquire current titles, save staff time, and build core collections. Even today, these reasons seem appropriate, as libraries try to maintain up-to-date collections and control personnel and operating budgets. However, as shown in Approval Plans: Issues and Innovations, the use of approval plans is not so simple and straightforward; their use is subject to complex procedures and policies--an

  6. Social Foundation of Scenario Planning

    DEFF Research Database (Denmark)

    Rowland, Nicholas James; Spaniol, Matthew Jon

    2017-01-01

    In this article, the authors establish that models of scenario planning typically involve a series of phases, stages, or steps that imply a sequenced (i.e., linear or chronological) process. Recursive models, in contrast, allow phases to repeat, thus, incorporating iteration. The authors acknowle......In this article, the authors establish that models of scenario planning typically involve a series of phases, stages, or steps that imply a sequenced (i.e., linear or chronological) process. Recursive models, in contrast, allow phases to repeat, thus, incorporating iteration. The authors...... from science and technology studies (STS) on knowledge production, the authors explain transition from one phase to the next and iteration between and within phases based on social negotiation. To this end, the authors examine the interplay between the “scenario development” phase and the “scenario use......” phase of a planning process with a non-governmental organization in Denmark. The upshot for facilitators is practical insight into how transition between phases and phase iteration in scenario planning can be identified, leveraged, and, thus, managed. The upshot for scholars is a related insight...

  7. First phase plan for experimental study of heavy-ion inertial fusion accelerator

    International Nuclear Information System (INIS)

    Hattori, Toshiyuki; Okamura, Masahiro; Oguri, Yoshiyuki; Aida, Toshihiro; Takeuchi, Kouichi; Sasa, Kimikazu; Itoh, Takashi; Okada, Masashi; Takahashi, Yousuke; Ishii, Yasuyuki.

    1993-01-01

    We propose the basic experiment plan of driver for heavy-ion inertial fusion by heavy-ion linac [1-3] system and the heavy-ion cooler synchrotron. As the first phase of planning, we will improve old heavy-ion accelerator system that accelerate small intensity around Cl ion with charge to mass ratio of 1/4 up to 2.4 MeV/amu. The injector of the system will exchange from the 1.6 MV Peletron Tandem accelerator to an RFQ type linac with an ECR heavy-ion source. According to building up the power sources of RF and focusing magnet, then it is able to accelerate intense around Xe ion with charge to mass ratio of 1/6 up to 2.4 MeV/amu. At the next stage of it, we will construct a heavy-ion cooler synchrotron having magneticrigidity of 3 or 6 Tm and begin to study about HIF driver. (author)

  8. Challenges Facing Early Phase Trials Sponsored by the National Cancer Institute: An Analysis of Corrective Action Plans to Improve Accrual.

    Science.gov (United States)

    Massett, Holly A; Mishkin, Grace; Rubinstein, Larry; Ivy, S Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A; Abrams, Jeffrey S

    2016-11-15

    Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAP) received for slow-accruing phase I and II trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for phase I trials and 66 for phase II trials. Primary reasons cited for slow accrual were safety/toxicity (phase I: 48%), design/protocol concerns (phase I: 42%, phase II: 33%), and eligibility criteria (phase I: 41%, phase II: 35%). The most commonly proposed corrective actions were adding institutions (phase I: 43%, phase II: 85%) and amending the trial to change eligibility or design (phase I: 55%, phase II: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (phase I = 48; phase II = 46). Of these, 67% of phase I and 70% of phase II trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial life cycles, but it may be more beneficial to invest in earlier accrual planning. Clin Cancer Res; 22(22); 5408-16. ©2016 AACRSee related commentary by Mileham and Kim, p. 5397. ©2016 American Association for Cancer Research.

  9. Film Presentation: Projekt Zukunft/Tomorrow Today

    CERN Multimedia

    Carolyn Lee

    2010-01-01

    Projekt Zukunft/Tomorrow Today, by Deutsche Welle (2009)   Deutsche Welle TV’s weekly science journal explores the LHC at CERN with host Ingolf Baur. Please note that we will show both the German and English versions of this broadcast. Each episode is about 27 minutes long. Projekt Zukunft/Tomorrow Today will be presented on Friday, 29 October from 13:00 to 14:00 in the Main Auditorium Language: German version followed by the English version      

  10. Sampling and analysis plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. This project directly supports Alternative 5 of the base action in the BCV Feasibility Study, and indirectly supports other alternatives through proof of concept. In that role, the ultimate goal is to install a treatment system that will remove uranium and nitrate from groundwater before it reaches Bear Creek. A secondary goal is the concurrent removal of technetium and several metals that impact ecological risk. This project is intended to produce hydraulic and treatment performance data required to design the treatment system to reach those goals. This project will also generate information that can be applied at other facilities within the Oak Ridge Reservation. This report is the sampling and analysis plan (SAP) for the field work component of Phase II of the BCV Treatability Study. Field work for this phase of the BCV Treatability Study consists of media testing. In-field continuous flow tests will be conducted over an extended time period (5 weeks) to generate data on long-term treatment effects on potential treatment media including sorbents and zero valent iron, over 28 weeks for constructed wetlands treatment, and over 24 weeks for algal mats treatment. The SAP addresses environmental sampling at the S-3 Site at the Oak Ridge Y-12 Plant. Samples will be taken from groundwater, effluent from test columns, effluent from an algal mat reactor, and effluent from a pilot-scale wetlands. This plan will be implemented as part of the BCV Phase II Treatability Study Best Management Practices Plan and in conjunction with the BCV Phase II Treatability Study Health and Safety Plan and the BCV Phase II Treatability Study Waste Management Plan

  11. Women in Energy: Rinku Gupta - Argonne Today

    Science.gov (United States)

    -performance clusters and supercomputers. What is the best part of your job? The best part is working with Argonne Today Argonne Today Mission People Work/Life Connections Focal Point Women in Energy: Rinku Gupta Home People Women in Energy: Rinku Gupta Women in Energy: Rinku Gupta Apr 1, 2016 | Posted by Argonne

  12. Nuclear energy today

    International Nuclear Information System (INIS)

    2003-01-01

    Energy is the power of the world's economies, whose appetite for this commodity is increasing as the leading economies expand and developing economies grow. How to provide the energy demanded while protecting our environment and conserving natural resources is a vital question facing us today. Many parts of our society are debating how to power the future and whether nuclear energy should play a role. Nuclear energy is a complex technology with serious issues and a controversial past. Yet it also has the potential to provide considerable benefits. In pondering the future of this imposing technology, people want to know. - How safe is nuclear energy? - Is nuclear energy economically competitive? - What role can nuclear energy play in meeting greenhouse gas reduction targets? - What can be done with the radioactive waste it generates? - Does its use increase the risk of proliferation of nuclear weapons? - Are there sufficient and secure resources to permit its prolonged exploitation? - Can tomorrow's nuclear energy be better than today's? This publication provides authoritative and factual replies to these questions. Written primarily to inform policy makers, it will also serve interested members of the public, academics, journalists and industry leaders. (author)

  13. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to

  14. Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)

    International Nuclear Information System (INIS)

    Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

    1982-01-01

    The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public

  15. Phase III (full scale) agitated mixing test plan

    International Nuclear Information System (INIS)

    Ruff, D.T.

    1994-01-01

    Waste Receiving and Processing Facility Module 2A (WRAP 2A) is the proposed second module of the WRAP facility. This facility will provide the required treatment for contact Handled (CH) Low Level (LL) Mixed Waste (MW) to allow its permanent disposal. Solidification of a portion of this waste using a cement based grout has been selected in order to reduce the toxicity and mobility of the waste in the disposal site. Mixing of the waste with the cement paste and material handling constraints/requirements associated with the mixed material is, therefore, a key process in the overall treatment strategy. This test plan addresses Phase 3, Full Scale Testing. The objectives of these tests are to determine if there are scale-up issues associated with the mixing results obtained in Phase 1 and 2 mixing tests, verify the workability of mixtures resulting from previous formulation development efforts (Waste Immobilization Development [WID]), and provide a baseline for WRAP 2A mixing equipment design. To this end, the following objectives are of particular interest: determine geometric influence of mixing blade at full scale (i.e., size, type, and location: height/offset); determine if similar results in terms of mixing effectiveness and product quality are achievable at this scale; determine if vibration is as effective at this larger scale in fluidizing the mixture and aiding in cleaning the vessel; determine if baffles or sweeping blades are needed to aid in mixing at the larger size and for cleaning the vessel; and determine quality of the poured monolithic product and investigate exotherm and filling influences at this larger size

  16. Elective course planning

    DEFF Research Database (Denmark)

    Kristiansen, Simon; Sørensen, Matias; Stidsen, Thomas Riis

    2011-01-01

    Efficient planning increasingly becomes an indispensable tool for management of both companies and public organizations. This is also the case for high school management in Denmark, because the growing individual freedom of the students to choose courses makes planning much more complex. Due...... to reforms, elective courses are today an important part of the curriculum, and elective courses are a good way to make high school education more attractive for the students. In this article, the problem of planning the elective courses is modeled using integer programming and three different solution...... for the Elective Course Planning Problem has been described in the literature before. The proposed algorithms are tested on data sets from 98 of the 150 high schools in Denmark. The tests show that for the majority of the problems, the optimal solution can be obtained within the one hour time bound. Furthermore...

  17. Quality of Context Enhancements and Cost Effective Radio over Fiber Network Planning

    DEFF Research Database (Denmark)

    Shawky, Ahmed Sherif Mahmoud

    In Communication networks today there is an endless quest for increased capacity and improved quality. With wireless systems being now popular worldwide for allowing users and devices to communicate and share information with each other irrespective of their location, the development of sustainable...... into dynamic context information reliability by developing models and online algorithms that ensure increased reliability for context information exchange. Eventually, the PhD looks into improving network planning by implementing an automated network planning model that takes advantage of both Radio over Fiber...... services. The increased number of mobile users puts a demand on today's networks in terms of application sensitivity, mobility and reliability. Mobile operators are offering various context-aware services and applications to the user. Today, mobile users are demanding access to dynamic context information...

  18. 200-ZP-1 phase II and III IRM groundwater pump and treat site safety plan

    International Nuclear Information System (INIS)

    St. John, C.H.

    1996-07-01

    This safety plan covers operations, maintenance, and support activities related to the 200-ZP-1 Phase II and III Ground Water Pump- and-Treat Facility. The purpose of the facility is to extract carbon tetrachloride contaminated groundwater underlying the ZP-1 Operable Unit; separate the contaminant from the groundwater; and reintroduce the treated water to the aquifer. An air stripping methodology is employed to convert volatile organics to a vapor phase for absorption onto granular activated carbon. The automated process incorporates a variety of process and safety features that shut down the process system in the event that process or safety parameters are exceeded or compromised

  19. Analysis of national allocation plans for the EU ETS

    Energy Technology Data Exchange (ETDEWEB)

    Zetterberg, Lars; Nilsson, Kristina; Aahman, Markus; Kumlin, Anna-Sofia; Birgersdotter, Lena

    2004-08-01

    The EU ETS is a Community-wide scheme established by Directive 2003/87/EC for trading allowances to cover the emissions of greenhouse gases from permitted installations. The first phase of the EU ETS runs from 1 January 2005 to 31 December 2007. Each Member State must develop a National Allocation Plan for the first phase stating: the total quantity of allowances that the Member State intends to issue during that phase; and how it proposes to distribute those allowances among the installations which are subject to the scheme In this paper twelve of the national allocation plans have been analysed and compared to the criteria stated in the EU Directive. The twelve allocation plans analysed are: the Austrian, the Danish, the Finnish, the German, the Irish, the Lithuanian, the Luxembourg, the Dutch, the Swedish, the British and the draft Flemish (Belgium) and Portuguese. Generally most countries have allocated generously to the trading sector. The allocation has often been based on future needs. For most sectors the allocation is higher than current emissions. Many countries will have to make large reductions in the non-trading sector and/or buy credits through JI- and CDM-projects in order to fulfil their commitment according to the EU burden sharing agreement of the Kyoto Protocol. In many of the allocation plans the emission reducing measures in the non-trading sector is poorly described and the credibility of the measures are hard to determine. Two sectors have been analysed in more detail, the energy and the mineral oil refining sectors. Figures presenting allocation vs. current emissions for those sectors are given for those countries where data was available in the allocation plan. The energy sector has been considered to have the best possibilities to pass on costs for the allowances to the consumers and hence the allocation to this sector is often more restricted than the allocation to other sectors. The mineral oil refining sector is more exposed to

  20. Building Tomorrow's Business Today

    Science.gov (United States)

    Ryan, Jim

    2010-01-01

    Modern automobile maintenance, like most skilled-trades jobs, is more than simple nuts and bolts. Today, skilled-trades jobs might mean hydraulics, computerized monitoring equipment, electronic blueprints, even lasers. As chief executive officer of Grainger, a business-to-business maintenance, repair, and operating supplies company that…

  1. Bricolage Planning: Understanding Planning in a Fragmented City

    OpenAIRE

    Jihad, Farah; Jacques, Teller

    2012-01-01

    Planning today is a field in reconstruction where new ways of thinking and making the city are experienced. It is trying to deal with the increasing fragmentation of space and society that is challenging its efficacy - even its relevance. In this chapter, by relying on Actor-Network Theory's concepts and case studies of Beirut's suburbs, we observe and analyze new practices, tools and efforts made to charter new ways for gathering resources and organizing collective action. In these case stud...

  2. Personal strategic planning

    Directory of Open Access Journals (Sweden)

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  3. Purex process extraction cycles: a potential for progress today

    Energy Technology Data Exchange (ETDEWEB)

    Boullis, B.; Germain, M.; Goumondy, J.P.; Rouyer, H.

    1994-12-31

    The Purex process very quickly and very widely supplanted the other concepts considered for nuclear fuel reprocessing after the presentation made at the Geneva Conference in 1955. The selectivity and radiolytic stability of tributylphosphate (T.B.P) clearly appeared to augur an extremely attractive process for completing the separation of valuable elements in the irradiated fuel. The concept has confirmed its validity, and subsequently its ability to adapt to changing requirements or constraints. Its industrial viability is in fact unquestioned today: Purex process is the basis of all the reprocessing plants in operation or planned throughout the world, and recent commissioning of the UP3 plant in France, in remarkable conditions, attests to such a level of maturity that one is tempted to ask the question: ``What remains to be proved, discovered or improved in the core of the Purex process?``. (authors). 7 refs., 4 tabs.

  4. Purex process extraction cycles: a potential for progress today

    International Nuclear Information System (INIS)

    Boullis, B.; Germain, M.; Goumondy, J.P.; Rouyer, H.

    1994-01-01

    The Purex process very quickly and very widely supplanted the other concepts considered for nuclear fuel reprocessing after the presentation made at the Geneva Conference in 1955. The selectivity and radiolytic stability of tributylphosphate (T.B.P) clearly appeared to augur an extremely attractive process for completing the separation of valuable elements in the irradiated fuel. The concept has confirmed its validity, and subsequently its ability to adapt to changing requirements or constraints. Its industrial viability is in fact unquestioned today: Purex process is the basis of all the reprocessing plants in operation or planned throughout the world, and recent commissioning of the UP3 plant in France, in remarkable conditions, attests to such a level of maturity that one is tempted to ask the question: ''What remains to be proved, discovered or improved in the core of the Purex process?''. (authors). 7 refs., 4 tabs

  5. How Small Businesses Market Their Products during the Different Phases of the Product Life Cycle: The Case of Swedish Ice Cream Manufacturers

    OpenAIRE

    Annika Hallberg; Susana Friberg; Paulina Myhrman

    2014-01-01

    The Swedish ice cream market of today is dominated by a few major market leaders, which makes it a challenge for small firms to make themselves visible and survive on a long-term basis. The aim of this article is to investigate and understand how small firms in the ice cream business market their products, based on the marketing mix and the portfolio matrix, during the different phases of the product life cycle. The combination of the two models for strategic planning enables t...

  6. Packaging Printing Today

    OpenAIRE

    Stanislav Bolanča; Igor Majnarić; Kristijan Golubović

    2015-01-01

    Printing packaging covers today about 50% of all the printing products. Among the printing products there are printing on labels, printing on flexible packaging, printing on folding boxes, printing on the boxes of corrugated board, printing on glass packaging, synthetic and metal ones. The mentioned packaging are printed in flexo printing technique, offset printing technique, intaglio halftone process, silk – screen printing, ink ball printing, digital printing and hybrid printing process. T...

  7. "UK today" Tallinnas / Tuuli Oder

    Index Scriptorium Estoniae

    Oder, Tuuli, 1958-

    2001-01-01

    Vabariikliku inglise keele olümpiaadi raames toimus Tallinnas viktoriini "UK today" lõppvoor. Osalesid 22 kooli kaheliikmelised võistkonnad. Viktoriini tulemused koolide lõikes ja küsimused õigete vastustega

  8. The Prospects of Radical Change Today

    Directory of Open Access Journals (Sweden)

    Slavoj Žižek

    2018-05-01

    Full Text Available In this contribution, Slavoj Žižek takes the occasion of Marx’s bicentenary for reflecting on the prospects of radical change today. First, it is shown that under Stalinism, Lenin’s works were quoted out of context in an arbitrary way in order to legitimise arbitrary political measures. Marxism thereby became an ideology that justified brutal subjective interventions. Second, this contribution poses the question of the revolutionary subject and democracy today. It stresses the role of both contingency and strategy in revolutions. In political assemblages taking place on public squares, the inert mass of ordinary people is transubstantiated into a politically engaged united force. The basic political problem today is how to best reconfigure democracy. Third, this contribution analyses the “interesting times” we live in. These are times that feature multiple crises, right-wing populism à la Donald Trump and Marine Le Pen, the lower classes’ opposition to immigration, and the refugee crisis. Questions about human rights and their violation and about radical change need to be asked in this context.

  9. Radiochemistry - today

    International Nuclear Information System (INIS)

    Drawe, H.

    1980-01-01

    After a longer starting period many radiation techniques have prevailed practically. Today radiation processes are usual components of chemistry, biology, medicine, and technologies in the most common sense. This paper deals with the latest state of radiation chemistry, whereas the possible practical applications are in the foreground of discussion as to reach mainly practicians in laboratory and industry. But also physicians, pharmacists and chemical engineers should be informed about the possibilities of application of high energyy radiation. Because radiation chemistry has also enriched works of related subjects, for example physical, organic and inorganic chemistry, this paper will also be of interest for experts of these disciplines. (orig.) [de

  10. Operating the Advanced Test Reactor in today's economic and regulatory environment

    International Nuclear Information System (INIS)

    Furstenau, R.V.; Patrick, M.E.; Mecham, D.C.

    1999-01-01

    The Advanced Test Reactor (ATR), located at the Idaho National Engineering and Environmental Laboratory, is the US Department of Energy's largest and most versatile test reactor. Base programs at ATR are planned well into the 21st century. The ATR and support facilities along with an overview of current programs will be reviewed, but the main focus of the presentation will be on the impact that today's economic and regulatory concerns have had on the operation of this test reactor. Today's economic and regulatory concerns have demanded more work be completed at lower cost while increasing the margin of safety. By the beginning of the 1990 s, federal budgets for research generally and particularly for nuclear research had decreased dramatically. Many national needs continued to require testing in the ATR; but demanded lower cost, increased efficiency, improved performance, and an increased margin of safety. At the same time budgets were decreasing, there was an increase in regulatory compliance activity. The new standards imposed higher margins of safety. The new era of greater openness and higher safety standards complemented research demands to work safer, smarter and more efficiently. Several changes were made at the ATR to meet the demands of the sponsors and public. Such changes included some workforce reductions, securing additional program sponsors, upgrading some facilities, dismantling other facilities, and implementing new safety programs. (author)

  11. Health Plans Can't Ignore The Customer Experience Any Longer.

    Science.gov (United States)

    Swanson, Erik

    2017-10-01

    With regulations limiting differentiation between products, health plans must rethink consumer experience to meet expectations of today's consumers, who seek convenience, quality, and speed from their health care organizations. Many plans understand they need to connect more effectively with their end customers, but technological, cultural, and other obstacles are in the way.

  12. TH-CD-202-08: Feasibility Study of Planning Phase Optimization Using Patient Geometry-Driven Information for Better Dose Sparing of Organ at Risks

    Energy Technology Data Exchange (ETDEWEB)

    Kang, S; Kim, D; Kim, T; Park, S; Shin, D; Kim, K; Cho, M; Suh, T [Department of Biomedical Engineering and Research Institute of Biomedical Engineering, College of Medicine, The Catholic University of Korea, Seoul (Korea, Republic of); Kim, S [Virginia Commonwealth University, Richmond, VA (United States)

    2016-06-15

    Purpose: To propose a simple and effective cost value function to search optimal planning phase (gating window) and demonstrated its feasibility for respiratory correlated radiation therapy. Methods: We acquired 4DCT of 10 phases for 10 lung patients who have tumor located near OARs such as esophagus, heart, and spinal cord (i.e., central lung cancer patients). A simplified mathematical optimization function was established by using overlap volume histogram (OVH) between the target and organ at risk (OAR) at each phase and the tolerance dose of selected OARs to achieve surrounding OARs dose-sparing. For all patients and all phases, delineation of the target volume and selected OARs (esophagus, heart, and spinal cord) was performed (by one observer to avoid inter-observer variation), then cost values were calculated for all phases. After the breathing phases were ranked according to cost value function, the relationship between score and dose distribution at highest and lowest cost value phases were evaluated by comparing the mean/max dose. Results: A simplified mathematical cost value function showed noticeable difference from phase to phase, implying it is possible to find optimal phases for gating window. The lowest cost value which may result in lower mean/max dose to OARs was distributed at various phases for all patients. The mean doses of the OARs significantly decreased about 10% with statistical significance for all 3 OARs at the phase with the lowest cost value. Also, the max doses of the OARs were decreased about 2∼5% at the phase with the lowest cost value compared to the phase with the highest cost value. Conclusion: It is demonstrated that optimal phases (in dose distribution perspective) for gating window could exist differently through each patient and the proposed cost value function can be a useful tool for determining such phases without performing dose optimization calculations. This research was supported by the Mid-career Researcher Program

  13. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  14. BUSINESS PLANS INFORMED BY DESIGN

    DEFF Research Database (Denmark)

    Petersen, Sørren Ingomar; Heebøll, John

    2011-01-01

    Today the value created by applying design at a business model and innovation level as opposed to a design and process level is marginal. Interviews with product developers from academia and industry suggest this is due to a lack of design perspective when formulating and evaluating business plans...... types. These were the design of products based on sustainable and on disruptive technologies. In conclusion, we recommend a procedure to align and translate business plan content into inspirational design briefs for enhancing design concept synthesis performance........ To remedy this, we propose including Design Quality Criteria drivers in the formulation of business plans. While auditing entrepreneurial business plans and design briefs content gaps were revealed between them. Strategy and context differences as well as a negative correlation between investors’ business...

  15. Financial Management in Children: Today Need, Tomorrow Necessity

    Directory of Open Access Journals (Sweden)

    Tooraj Sadeghi

    2015-05-01

    Full Text Available Nearly 80% of young people today will never be able to retire. Why? Because they lack the personal finance training that leads to long-term planning and future security. Connecting the dots between kids and money management skills prepares them for the financial realities the world will face over the next century. Pocket money is one of the first ways for children to learn the basics of managing money – a skill they’ll definitely need for life – and it makes children feel independent. Whether to give pocket money, and at what age, and how much to give are issues that often concern parents. There are many ways to handle this. To a large extent it depends on family values, practices and finances. The main reason for giving children pocket money is to help children learn to be able to manage money while they are still young and parents can guide them. It also may help children to feel that they are important members of the family, because they are given part of the family's spending money.

  16. The Alchemist of Today

    Science.gov (United States)

    Serret, Natasha

    2010-01-01

    Traditionally, alchemy has involved the power of transmuting base metals such as lead into gold or producing the "elixir of life" for those wealthy people who wanted to live forever. But what of today's developments? One hundred years ago, even breaking the four-minute mile would have been deemed "magic," which is what the alchemists of the past…

  17. Requirements, guidance and logic in planning environmental investigations: Approval versus implementation

    International Nuclear Information System (INIS)

    Brice, D.A.; Meredith, D.V.; Harris, M.Q.

    1993-01-01

    In today's litigious society, it is important for both private parties and government to plan and conduct environmental investigations in a scientifically sound manner, documenting the purpose, methods, and results in a consistent fashion throughout the exercise. Planning documents are prepared during the initial phases of environmental investigations. Project objectives, including data quality requirements, specific work to be conducted to fulfill data needs, and operating procedures are specified. Regulatory agency approval of these documents is often required prior to plan implementation. These approvals are necessary and appropriate to fulfilling the agency's mandated role. Many guidance documents prepared by regulatory agencies suggest the content and format of various scoping documents. These guidances help standardize thought processes and considerations in planning, and provide a template to ensure that both the plan and the proposed work will fulfill regulatory requirements. This work describes the preparation and use of guidance documents for planning environmental studies. The goals and some of the pitfalls of such documents are discussed. Guidance should include the following elements: the purpose of the guidance and a description of where it applies; the type of items to be addressed in planning; identification of requirements are applicable to all projects for which the guidance is intended; identification of requirements only applicable in certain situations; a description of items to facilitate planning; a suggested format for fulfilling requirements; example applications of the guidance. Disagreements arise between planners and reviewers/approvers when elements of guidance are used as leverage to require work not directly related to project objectives. Guidance may be inappropriately used as a milestone by which site-specific plans are judged. Regulatory agency review and approval may be regarded as a primary objective of the plan

  18. Planning and reporting of Russian transmutation research projects within ISTC. Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Conde, H. [Uppsala Univ. (Sweden). Dept. of Neutron Research; Gudowski, W. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Reactor and Neutron Physics; Liljenzin, J.O. [Chalmers Univ. of Technology, Goeteborg (Sweden). Dept. of Nuclear Chemistry; Mileikovsky, C. [Pully (Switzerland)

    1998-11-01

    The present report about phase 2 of the SKI project on Planning and Reporting of Russian Transmutation Research Projects within ISTC is an update of the information given in the SKI report no 97:15 (Feb 1997) about phase 1 of the same project. The background information is partly repeated in the present report to avoid that the reader has to go back to the report of Phase 1 for information about the basis for the project. USA, EU, Japan, Republic of Korea and Norway are at present supporting the International Scientific and Technical Center (ISTC) in Moscow. The Centre gives funds to research projects of civilian interest to former nuclear weapon laboratories to counteract the risk of nuclear weapon proliferation by the emigration of former USSR technical and scientific experts to `border countries` which are aiming towards the development of nuclear weapons. Before Sweden and Finland entered the EU, both countries gave national support to ISTC, in the case of Sweden 4 MUSD. Some of the projects which were funded by the Swedish national support to ISTC are still in progress. Nuclear technical concepts (i.e. Accelerator Transmutation of Nuclear Waste, ATW) have been proposed to incinerate and transmute long-lived radioactive nuclear waste to relax the time needed to store the waste in a geological repository. The named Russian experts are knowledgeable and well equipped of doing research in the different technical fields of relevance for the transmutation concepts. Thus, a number of ISTC projects have been initiated, and further ones have been proposed, to investigate different technical aspects of ATW with a result that a fair number of former weapon specialists have converted from military to peaceful civilian research. A similar centre STCU (The Scientific and Technical Centre of the Ukraine) has been set up in Kiev. Sweden has been active in promoting this Centre, which is supported by USA, Japan, Canada and recently also by EU. The present report describes the

  19. Planning and reporting of Russian transmutation research projects within ISTC. Phase 2

    International Nuclear Information System (INIS)

    Conde, H.

    1998-11-01

    The present report about phase 2 of the SKI project on Planning and Reporting of Russian Transmutation Research Projects within ISTC is an update of the information given in the SKI report no 97:15 (Feb 1997) about phase 1 of the same project. The background information is partly repeated in the present report to avoid that the reader has to go back to the report of Phase 1 for information about the basis for the project. USA, EU, Japan, Republic of Korea and Norway are at present supporting the International Scientific and Technical Center (ISTC) in Moscow. The Centre gives funds to research projects of civilian interest to former nuclear weapon laboratories to counteract the risk of nuclear weapon proliferation by the emigration of former USSR technical and scientific experts to 'border countries' which are aiming towards the development of nuclear weapons. Before Sweden and Finland entered the EU, both countries gave national support to ISTC, in the case of Sweden 4 MUSD. Some of the projects which were funded by the Swedish national support to ISTC are still in progress. Nuclear technical concepts (i.e. Accelerator Transmutation of Nuclear Waste, ATW) have been proposed to incinerate and transmute long-lived radioactive nuclear waste to relax the time needed to store the waste in a geological repository. The named Russian experts are knowledgeable and well equipped of doing research in the different technical fields of relevance for the transmutation concepts. Thus, a number of ISTC projects have been initiated, and further ones have been proposed, to investigate different technical aspects of ATW with a result that a fair number of former weapon specialists have converted from military to peaceful civilian research. A similar centre STCU (The Scientific and Technical Centre of the Ukraine) has been set up in Kiev. Sweden has been active in promoting this Centre, which is supported by USA, Japan, Canada and recently also by EU. The present report describes the

  20. Slovenian spatial planning system: Key changes of past decade

    Directory of Open Access Journals (Sweden)

    Lavrenčić Valentina

    2002-01-01

    Full Text Available Spatial planning has a long tradition in Slovenia. It was always a part of the integrated planning process, first institutionalized in 1968. The planning system was quite unique, combining economic, social, and spatial aspects in one, a so called long-term and medium-term social plan. At the national level its spatial part consisted of the national spatial plan, the defining concept for settlement management and growth, public service delivery, use of space and landscape transformation, protection of the environment, and guidelines for conflict management. Today, this form of planning is substituted by the national strategies and programs of each sector.

  1. Planning Strategies in an Age of Active Citizenship : A Post-structuralist Agenda for Self-organization in Spatial Planning

    NARCIS (Netherlands)

    Boonstra, B.

    2015-01-01

    Civic initiatives in spatial development are on the rise. Whereas for a long time they were just a fringe movement, sometimes even a stand in the way of planned urban development, civic initiatives today are increasingly seen as valuable strategies for urban development. So far, however, when

  2. From Fayol's Mechanistic to Today's Organic Functions of Management

    Science.gov (United States)

    McNamara, Daniel E.

    2009-01-01

    This paper reviews Fayol's original five managerial functions, demonstrates that they are still being taught in today's management courses, and offers a new set of organic management functions more applicable to today's turbulent business environment.

  3. Putting PhDs to work: career planning for today's scientist.

    Science.gov (United States)

    Hobin, Jennifer A; Clifford, Philip S; Dunn, Ben M; Rich, Susan; Justement, Louis B

    2014-01-01

    Individual development plans (IDPs) have been promoted nationally as a tool to help research trainees explore career opportunities and set career goals. Despite the interest in IDPs from a policy perspective, there is little information about how they have been used. The authors examined IDP awareness and use, the benefits of creating an IDP, and ways to facilitate its use by administering a survey to current or former postdoctoral researchers via the National Postdoctoral Association (NPA) and University of Alabama at Birmingham email lists; individuals belonging to Federation of American Societies for Experimental Biology member societies who mentored postdocs; and postdoctoral administrators at member institutions of the Association of American Medical Colleges and the NPA. Although most postdoctoral administrators (>80%) were familiar with IDPs, less than 50% of postdocs and only 20% of mentors were aware of IDPs. For those postdocs and mentors who reported creating an IDP, the process helped postdocs to identify the skills and abilities necessary for career success and facilitated communication between postdocs and their mentors. Despite the fact that creating an IDP benefits postdocs and mentors, IDP use will likely remain low unless institutions and research mentors encourage trainees to engage in this process.

  4. Village family planning volunteers in Indonesia: their role in the family planning programme.

    Science.gov (United States)

    Utomo, Iwu Dwisetyani; Arsyad, Syahmida S; Hasmi, Eddy Nurul

    2006-05-01

    Family planning was once a sensitive issue in Indonesia, but today it is considered essential. This paper reports on a study in 1997-98 of the role of village family planning volunteers and the cadres who worked under them in West Java, Central Java and DI Yogyakarta, in implementing the national family planning programme in Indonesia. A total of 108 village family planning volunteers, 108 family planning cadres, 108 local leaders and 324 couples eligible for family planning from 36 villages in the three provinces were interviewed. The volunteers and cadres have made a significant contribution to the implementation of the family planning programme. They promote family planning, organise meetings, provide information, organise income-generation activities, give savings and credit assistance, collect and report data and deliver other family welfare services. Teachers, wives of government officials and others recognised by the community as better off in terms of education and living conditions were most often identified to become family planning volunteers. Because they are women and because they are the most distant arm of the programme, their work is taken for granted. As their activities are directed towards women, especially in women's traditional roles, the programme tends to entrench the existing gender gap in responsibility for family planning and family welfare.

  5. Speckle metrology in the nanoworld, as it is perceived today, and how it may affect industry

    Science.gov (United States)

    Pryputniewicz, Ryszard J.

    2010-09-01

    My memory goes back to my early collage studies that were almost entirely on the scale of "macroworld", as we practiced/perceived it some four decades ago. Since that time things have changed a lot constantly decreasing the scales of interest, at times at rather rapid pace, with monumental advances leading to the scales we work with today and plan for tomorrow. During that change/transition there were "meso" and "micro" developments characterized by changes in scales/sizes of things of interest. Today's scale of interest is "nano" and we are already not only working with "picotechnology", but are even reaching beyond while constantly "planning and projecting" the scales/worlds of the future. Advancement of any technology, especially new emerging ones as we witness/experience them today, is facilitated by the use of all available solution strategies. One of the emerging strategies that affect almost anything currently being developed and/or used, in the today's nanoworld, is based on recent advances of microelectromechanical systems (MEMS). Today MEMS affect almost everything we do from household appliances, via cars we drive and planes that whisk us from continent to continent, to spaceships used for search of/and exploration of other worlds. The modern microsensors are also used to explore for and produce petroleum products that are used in multitude of today's applications. To facilitate these advances a great majority of MEMS is used in the form of sensors. However development of MEMS in general and sensors in particular poses one of the greatest challenges in today's experimental mechanics. Among MEMS, the greatest contemporary interest is in the area of inertial sensors because they have numerous uses ranging from everyday applications to highly specialized ones, including many industrial platforms. As such they have tremendous potential to affect future of humanity. However, advances in MEMS, such as pressure and temperature sensors as well as gyroscopes and

  6. The Student Plan

    DEFF Research Database (Denmark)

    Krejsler, John B.

    2009-01-01

    that must reconcile the challenges of student diversity, differentiated teaching, the documentation of achievement and so forth. Social technologies reduce complexity by coding procedures, thus signalling what is expected in terms of learning activities, and by coding subject positions, thereby guiding...... teachers and students in terms of the roles they may position themselves in. Some of the most prevalent social technologies adopted by schools today include project work, logbooks, social contracts, interactive testing, and student and personal action plans....

  7. Participatory management in today's health care setting

    International Nuclear Information System (INIS)

    Burnham, B.A.

    1987-01-01

    As the health care revolution progresses, so must the management styles of today's leaders. The authors must ask ourselves if we are managing tomorrow's work force or the work force of the past. Participatory management may better meet the needs of today's work force. This paper identifies the reasons participatory management is a more effective management style, the methods used to implement a participatory management program, its benefits (such as higher productivity and more efficient, effective implementation and acceptance of change), and the difficulties experienced

  8. Operation Chromite: Amphibious Planning

    OpenAIRE

    2005-01-01

    tut present Tutorial Presentation Interactive Media Element This interactive tutorial covers the Inchon landing case study that provides several good examples of the types of decisions made during the amphibious planning process, and how they compare to the current matrix of the ten primary decisions for amphibious operation required today by joint doctrine. Operation Chromite is used as an example. 8808A Warfighting from the Sea: Amphibious Operations

  9. Test Room Stability Plan

    International Nuclear Information System (INIS)

    1993-01-01

    This plan documents the combination of designs, installations, programs, and activities that ensures that the underground excavations at the Waste Isolation Pilot Plant (WIPP), in which transuranic (TRU) waste may be emplaced during the Test Phase, will remain sufficiently stable and safe during that time. The current ground support systems installed at the WIPP are the result of over ten years of data collection from hundreds of geomechanical instruments and thousands of hours of direct observation of the changing conditions of the openings. In addition, some of the world's most respected experts on salt rock mechanics have provided input in the design process and concurrence on the suitability of the final design. The general mine rockbolt pattern and the ground support system for the test rooms are designed to specifically address the fracture and deformation geometries observed today at the WIPP. After an introductory chapter, this plan describes the general underground design, then proceeds to an account of general ground support performance, and finally focuses on the details of the special test room ground support systems. One such system already installed in Room 1, Panel 1, is described in comprehensive detail. Other test rooms in Panel 1, whether full-size or smaller, will be equipped with systems that ensure stability to the same or equivalent extent. They will benefit from the experience gained in the first test room, which in turn benefitted from the data and knowledge accumulated during previous stages (e.g., the Site and Preliminary Design Validation program) of the project

  10. Plans for the next phase of CORDEX activities

    Science.gov (United States)

    Giorgi, Filippo; Gutowski, William

    2016-04-01

    Ensembles of Regional Climate Model (RCM) projections have been completed under the protocol of the first phase of the COordinated Regional Downscaling EXperiment (CORDEX, Giorgi et al. 2009) over most CORDEX domains. As a result of these activities a number of scientific issues have emerged, which provide the basis for discussion of the next phase of the CORDEX program. Among such issues are a clearer identification and quantification of the added value of the use of RCMs, the development and use of a new generation of very high resolution (Regional Earth System Models (RESMs), a more detailed and process-based analysis of RCM simulations, the effects of regional forcings (e.g. land use change and aerosols) and a better integration of empirical/statistical downscaling within the CORDEX framework. A large inhomogeneity was also noted across different CORDEX regional efforts, with some domains (e.g. EURO-CORDEX, AFRICA-CORDEX and MED-CORDEX) being covered by large ensembles and others by much more sparse experiment matrices. This has limited the use of CORDEX results in international programs such as the Intergovernmental Panel on Climate Change (IPCC). Two avenues are being discussed in order to address these issues. The first is to produce a homogeneous set of higher resolution projections (10-20 km) across all or most CORDEX domains using a core set of RCMs downscaling a core set of GCMs. The second is to develop and implement a set of "Flagship Pilot Studies (FPSs)" over sub-regions of interest aimed at addressing specific scientific questions (e.g. added value and convection-permitting simulations, intercomparison of different downscaling approaches, land-use and aerosol effects). In this presentation we will describe the status of the discussion and plans for these new CORDEX initiatives, which will be likely finalized at the upcoming third Pan-CORDEX conference (ICRC-CORDEX 2016) to be held in Stockholm on 17-10 May, 2016. Giorgi F, Jones C, Asrar G, 2009

  11. WIPP [Waste Isolation Pilot Plant] test phase plan: Performance assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs

  12. The communicative ideology in spatial planning : some critical reflections based on the Dutch experience

    NARCIS (Netherlands)

    Voogd, H; Woltjer, J

    1999-01-01

    Communicative, or collaborative, planning has received a lot of attention recently. Many planners today agree that planning should be a process of facilitating community collaboration for consensus-building. As a consequence, it seems that communicative rationality is becoming more important in

  13. The communicative ideology in spatial planning: some critical reflections based on the Dutch experience

    NARCIS (Netherlands)

    Voogd, H.; Woltjer, J.

    1999-01-01

    Communicative, or collaborative, planning has received a lot of attention recently. Many planners today agree that planning should be a process of facilitating community collaboration for consensus-building. As a consequence, it seems that communicative rationality is becoming more important in

  14. Family-Centered Early Intervention Visual Impairment Services through Matrix Session Planning

    Science.gov (United States)

    Ely, Mindy S.; Gullifor, Kateri; Hollinshead, Tara

    2017-01-01

    Early intervention visual impairment services are built on a model that values family. Matrix session planning pulls together parent priorities, family routines, and identified strategies in a way that helps families and early intervention professionals outline a plan that can both highlight long-term goals and focus on what can be done today.…

  15. Nuclear technology today and tomorrow

    International Nuclear Information System (INIS)

    Lombardi, C.

    2007-01-01

    Nuclear power has returned today to contain the energy problem. It is useful to make a summary of its characteristics and its evolution over the past 50 years and its prospects. The Italy can rely on their way by revitalizing its potential not fully disappeared [it

  16. Nationwide Plan Review Phase 1 Report

    National Research Council Canada - National Science Library

    2006-01-01

    ...] and the Secretary of Homeland Security, in coordination with Gulf Coast States and contiguous States, shall jointly review and assess Federal and State evacuation plans for catastrophic hurricanes...

  17. A control strategy for induction motors fed from single phase supply

    DEFF Research Database (Denmark)

    Søndergård, Lars Møller

    1993-01-01

    It is often required that a three-phased asynchronous motor can run at variable speed, which makes it necessary to use a three-phase inverter driven from a DC-source. Today, most inverters are driven from the network using a simple diode bridge and an electrolytic capacitor. The problem with the ......It is often required that a three-phased asynchronous motor can run at variable speed, which makes it necessary to use a three-phase inverter driven from a DC-source. Today, most inverters are driven from the network using a simple diode bridge and an electrolytic capacitor. The problem...... with the simple diode bridge and the electrolytic capacitor is that current is only drawn for short periods, which gives rise to harmonic currents in the network. For small drive systems (motor+inverter), i.e. less than 1.5 kW, a single phase network outlet is often used. The author describes a method whereby...

  18. Nationwide Plan Review Phase 2 Report

    National Research Council Canada - National Science Library

    2006-01-01

    .... These events tested the Nation's ability to respond to catastrophic events and demonstrated the importance of ensuring the effectiveness of Federal, State, and local plans and the ability to quickly...

  19. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Energy Systems to prepare a Phase II Sampling Plan to describe the field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of the Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to the applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures

  20. Cognitive Biases and Structural Failures in United States Foreign Policy: Explaining Decision-Making Dissonance in Phase IV Policy and Plans for Iraq

    National Research Council Canada - National Science Library

    Hafner, Ferinand

    2007-01-01

    .... This thesis applies four decision-making perspectives the rational actor, organizational process, bureaucratic politics, and individual level approaches to the Phase IV planning process to analyze...

  1. School Counseling in China Today

    Science.gov (United States)

    Thomason, Timothy C.; Qiong, Xiao

    2008-01-01

    This article provides a brief overview of the development of psychological thinking in China and social influences on the practice of school counseling today. Common problems of students are described, including anxiety due to pressure to perform well on exams, loneliness and social discomfort, and video game addiction. Counseling approaches used…

  2. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  3. Supply chain planning classification

    Science.gov (United States)

    Hvolby, Hans-Henrik; Trienekens, Jacques; Bonde, Hans

    2001-10-01

    Industry experience a need to shift in focus from internal production planning towards planning in the supply network. In this respect customer oriented thinking becomes almost a common good amongst companies in the supply network. An increase in the use of information technology is needed to enable companies to better tune their production planning with customers and suppliers. Information technology opportunities and supply chain planning systems facilitate companies to monitor and control their supplier network. In spite if these developments, most links in today's supply chains make individual plans, because the real demand information is not available throughout the chain. The current systems and processes of the supply chains are not designed to meet the requirements now placed upon them. For long term relationships with suppliers and customers, an integrated decision-making process is needed in order to obtain a satisfactory result for all parties. Especially when customized production and short lead-time is in focus. An effective value chain makes inventory available and visible among the value chain members, minimizes response time and optimizes total inventory value held throughout the chain. In this paper a supply chain planning classification grid is presented based current manufacturing classifications and supply chain planning initiatives.

  4. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  5. The planning cycle.

    Science.gov (United States)

    Johnson, William

    2005-01-01

    Information technology planning can be described as a continuous cyclical process composed of three phases whose primary purpose is optimum allocation of scarce resources. In the assessment phase, planners assess user needs, environmental factors, business objectives, and IT infrastructure needs to develop IT projects that address needs in each of these areas. A major goal of this phase is to develop a broad IT inventory. The prioritization phase seeks to ensure optimum allocation of scarce resources by prioritizing ITprojects based on: Costs--total life cycle costs. Benefits--both quantitative and non-quantitative, including support for the organization's strategic business objectives. Risks--subjective assessments of technological and non-technological risks. Implementation requirements--time and personnel requirements to implement the system. The scheduling phase incorporates sequencing considerations, personnel availability, and budgetary constraints to produce an IT plan in which project priorities are adjusted to meet organizational realities.

  6. Einstein today; Einstein aujourd'hui

    Energy Technology Data Exchange (ETDEWEB)

    Aspect, A.; Grangier, Ph. [Centre National de la Recherche Scientifique (CNRS), Lab. Charles Fabry de l' Institut d' Optique a Orsay, 91 - Orsay (France); Bouchet, F.R. [Institut d' Astrophysique de Paris, CNRS, 75 - Paris (France); Brunet, E.; Derrida, B. [Universite Pierre et Marie Curie, Ecole Normale Superieure, 75 - Paris (France); Cohen-Tannoudji, C. [Academie des Sciences, 75 - Paris (France); Dalibard, J.; Laloe, F. [Laboratoire Kastler Brossel. UMR 8552 (ENS, UPMC, CNRS), 75 - Paris (France); Damour, Th. [Institut des Hautes Etudes Scientifiques, 91 - Bures sur Yvette (France); Darrigol, O. [Centre National de la Recherche Scientifique (CNRS), Groupe Histoire des Sciences Rehseis, 75 - Paris (France); Pocholle, J.P. [Thales Research et Technology France, 91 - Palaiseau (France)

    2005-07-01

    The most important contributions of Einstein involve 5 fields of physics : the existence of quanta (light quanta, stimulated radiation emission and Bose-Einstein condensation), relativity, fluctuations (Brownian motion and thermodynamical fluctuations), the basis of quantum physics and cosmology (cosmological constant and the expansion of the universe). Diverse and renowned physicists have appreciated the development of modern physics from Einstein's ideas to the knowledge of today. This book is a collective book that gathers their work under 7 chapters: 1) 1905, a new beginning; 2) from the Einstein, Podolsky and Rosen's article to quantum information (cryptography and quantum computers); 3) the Bose-Einstein condensation in gases; 4) from stimulated emission to the today's lasers; 5) Brownian motion and the fluctuation-dissipation theory; 6) general relativity; and 7) cosmology. (A.C.)

  7. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  8. Review of Huebert’s Libertarianism Today

    OpenAIRE

    Walter E. Block

    2010-01-01

    Libertarianism Today, by Jacob Huebert (Santa Barbara, CA: Praeger, 2010), is an excellent introduction to libertarianism. In contrast to many other recent books about libertarianism, a consistent non-compromising libertarianism is defended throughout this book.

  9. Using Iterative Plan-Do-Study-Act Cycles to Improve Teaching Pedagogy.

    Science.gov (United States)

    Murray, Elizabeth J

    2018-01-15

    Most students entering nursing programs today are members of Generation Y or the Millennial generation, and they learn differently than previous generations. Nurse educators must consider implementing innovative teaching strategies that appeal to the newest generation of learners. The Plan-Do-Study-Act cycle is a framework that can be helpful when planning, assessing, and continually improving teaching pedagogy. This article describes the use of iterative Plan-Do-Study-Act cycles to implement a change in teaching pedagogy.

  10. Groundwater movements around a repository. Phase 1, State of the art and detailed study plan

    International Nuclear Information System (INIS)

    Lindblom, U.

    1977-02-01

    The report was prepared as the first phase of a study of the groundwater movements around a repository for spent nuclear fuel in the precambrian bedrock of Sweden. The objectives of these studies are to provide a state of the art review of groundwater slow in the region of a repository in granitic rock, in order to provide a basis for long term containment assessments and to prepare a detailed study plan for the continuation of the project. The different processes affecting the groundwater situation for containment are given. A state of the art review of the fluid flow, geochemical, heat transfer and rock mechanics processes as they relate to containment is presented. A detailed study plan to provide a comprehensive assessment of the hydrogeological regime around the repository during its lifetime is also presented. The groundwater flow fields will provide a basis for subsequent long term containment studies. (L.B.)

  11. A fast 4D IMRT/VMAT planning method based on segment aperture morphing.

    Science.gov (United States)

    Klawikowski, Slade; Tai, An; Ates, Ozgur; Ahunbay, Ergun; Li, X Allen

    2018-04-01

    Four-dimensional volumetric modulated arc therapy (4D VMAT) and four-dimensional intensity-modulated radiotherapy (4D IMRT) are developing radiation therapy treatment strategies designed to maximize dose conformality, minimize normal tissue dose, and deliver the treatment as efficiently as possible. The patient's entire breathing cycle is captured through 4D imaging modalities and then separated into individual breathing phases for planning purposes. Optimizing multiphase VMAT and IMRT plans is computationally demanding and currently impractical for clinical application. The purpose of this study is to assess a new planning process decreasing the upfront computational time required to optimize multiphased treatment plans while maintaining good plan quality. Optimized VMAT and IMRT plans were created on the end-of-exhale (EOE) breathing phase of 10-phase 4D CT scans with planning tumor volume (PTV)-based targets. These single-phase optimized plans are analogous to single-phase gated treatment plans. The simulated tracked plans were created by deformably registering EOE contours to the remaining breathing phases, recalculating the optimized EOE plan onto the other individual phases and realigning the MLC's relative positions to the PTV border in each of the individual breathing phases using a segment aperture morphing (SAM) algorithm. Doses for each of the 10 phases were calculated with the treatment planning system and deformably transferred back onto the EOE phase and averaged with equal weighting simulating the actual delivered dose a patient would potentially receive in a tracked treatment plan. Plan DVH quality for the 10-phase 4D SAM plans were comparable with the individual EOE optimized treatment plans for the PTV structures as well as the organ at risk structures. SAM-based algorithms out performed simpler isocenter-shifted only approaches. SAM-based 4D planning greatly reduced plan computation time vs individually optimizing all 10 phases. In addition

  12. Challenging today's nuclear industry to be competitive in a changing tomorrow

    International Nuclear Information System (INIS)

    Plug, B.

    1996-01-01

    As the millennium approaches, the future of the nuclear power generation appears desolate. Today's nuclear executives are facing challenges resulting from worldwide change and have forced utilities to reevaluate their corporation's future directions. The nuclear industry must be competitive more than ever to address today's rapid changing marketplace and pressures exerted from: regulatory reformation; increased competition; changes in technology; customer evolution; and globalization. These factors have compelled nuclear executives to address questions such as: What impact will these changes have on today's marketplace, and on my corporation? What will characterize tomorrow's successful nuclear facility? How can today's nuclear corporation compete in tomorrow's marketplace? Will my corporation survive? (author)

  13. Creating Space Force Structure Through Strategic Planning: The Air Force Reserve Visioning Process

    National Research Council Canada - National Science Library

    Shaw, Robert

    1999-01-01

    This research paper will assess the challenges and potential inadequacies of today's military leaders in understanding the importance of coupling strategic visioning and strategic planning processes...

  14. Aerocapacitor commercialization plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  15. Flight planning and flexible use of airspace in Free route airspace area

    Directory of Open Access Journals (Sweden)

    Martin Kodera

    2014-01-01

    Full Text Available The paper summarizes changes in the flight planning caused by the introduction of Free Route Airspace Project and suggests possible measures needed to be adopted across the whole system in order to ensure military and civilian aircraft remain segregated in a way that is today ensured by the system of conditional routes. The paper suggests a possible solution in flight planning using existing flight planning tools provided by the CFMU.

  16. Wind Power Today: Wind Energy Program Highlights 2001

    Energy Technology Data Exchange (ETDEWEB)

    2002-05-01

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program accomplishments for the previous year. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry. This 2001 edition of Wind Power Today also includes discussions about wind industry growth in 2001, how DOE is taking advantage of low wind speed regions through advancing technology, and distributed applications for small wind turbines.

  17. Psychoanalysis today

    Science.gov (United States)

    FONAGY, PETER

    2003-01-01

    The paper discusses the precarious position of psychoanalysis, a therapeutic approach which historically has defined itself by freedom from constraint and counted treatment length not in terms of number of sessions but in terms of years, in today's era of empirically validated treatments and brief structured interventions. The evidence that exists for the effectiveness of psychoanalysis as a treatment for psychological disorder is reviewed. The evidence base is significant and growing, but less than might meet criteria for an empirically based therapy. The author goes on to argue that the absence of evidence may be symptomatic of the epistemic difficulties that psychoanalysis faces in the context of 21st century psychiatry, and examines some of the philosophical problems faced by psychoanalysis as a model of the mind. Finally some changes necessary in order to ensure a future for psychoanalysis and psychoanalytic therapies within psychiatry are suggested. PMID:16946899

  18. After the Resistance: The Alamo Today

    Centers for Disease Control (CDC) Podcasts

    2014-09-23

    Byron Breedlove reads his essay After the Resistance: The Alamo Today about the Alamo and emerging disease resistance.  Created: 9/23/2014 by National Center for Emerging and Zoonotic Infectious Diseases (NCEZID).   Date Released: 10/20/2014.

  19. Start-Up Mega Planning--A Case History

    Science.gov (United States)

    Forbes, Ronald; Forbes, Dylan; Hoskins, Peter

    2005-01-01

    Social Responsibility is becoming a key issue for organizations today. They talk about it and they make social contributions, but how do we know if anything is being achieved? A framework is required and has existed at least since 1992. Roger Kaufman's Mega Planning has slowly gathered momentum in organizations worldwide. For a faster take-up we…

  20. Public interface and waste management planning: An approach for integrating community involvement in waste strategies

    International Nuclear Information System (INIS)

    Xiques, P.J.

    1988-01-01

    Public involvement and information programs have bridged a communication abyss and allowed waste management policy-makers to understand legitimate public concerns. The perception often held by waste generators that technical concerns had greater validity than institutional issues is being altered as managers realize that information failures can halt a program as abruptly as technical ones. The role and level of involvement of the public in establishing waste management policies has changed dramatically over the past decade. Once the domain only of the generators and regulators, effective waste management strategy development must now make early provisions for public and local government involvement. By allowing public decision makers to participate in the initial planning process and maintain involvement throughout the implementation, many institutional barriers can be avoided. In today's climate, such barriers may represent direct costs, such as litigation, or indirect costs, such as delay, deferral, or duplication of work. Government programs have historically enjoyed a degree of insulation from public involvement factors on the basis of national security, defense, or the greater public good. However, such programs are no longer sacrosanct. Today, the cost of cleaning up past environmental impact can leave little or no money to meet present program objectives. Thus failure to get a public consensus before beginning remedial action can have a major impact on the allocation of scarce resources. Specific approaches to integrating the public into the planning phase of waste management will be addressed, including audience identification, issue analysis and tracking, prioritization of concerns, and information tool development

  1. E-learning. Today and tomorrow

    International Nuclear Information System (INIS)

    Gelbke, Silvana

    2010-01-01

    Today, new technologies revolutionize the way of handling information, exchanging knowledge and learning. The definition of the term ''e-learning'' mostly comprehends teaching and learning using a range of electronic media (Internet, CD-ROMs). However, further differentiation is necessary to describe the entire spectrum of methods included in this term. These different approaches are reflected in their implementation by the companies presented. (orig.)

  2. 29 CFR 2509.78-1 - Interpretive bulletin relating to payments by certain employee welfare benefit plans.

    Science.gov (United States)

    2010-07-01

    ... employee welfare benefit plans. 2509.78-1 Section 2509.78-1 Labor Regulations Relating to Labor (Continued) EMPLOYEE BENEFITS SECURITY ADMINISTRATION, DEPARTMENT OF LABOR GENERAL INTERPRETIVE BULLETINS RELATING TO... payments by certain employee welfare benefit plans. The Department of Labor today announced its...

  3. Critical path method as the criterion for optimization of business planning process

    OpenAIRE

    Butsenko Elena V.

    2016-01-01

    In today's economy the task of improving business planning is considered a necessary component of any enterprise management process and is precisely the solution drawn from that task which determines the financial policy and economic structure. The development of technologies based on the optimization of business planning is a very urgent scientific challenge. In this paper we propose to use the methods of network planning and management as a tool for economic and mathematical modeling to...

  4. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  5. The Role of Inflation-Indexed Bond in Optimal Management of Defined Contribution Pension Plan During the Decumulation Phase

    Directory of Open Access Journals (Sweden)

    Xiaoyi Zhang

    2018-03-01

    Full Text Available This paper investigates the optimal investment strategy for a defined contribution (DC pension plan during the decumulation phase which is risk-averse and pays close attention to inflation risk. The plan aims to maximize the expected constant relative risk aversion (CRRA utility from the terminal real wealth by investing the fund in a financial market consisting of an inflation-indexed bond, an ordinary zero coupon bond and a risk-free asset. We derive the optimal investment strategy in closed-form using the dynamic programming approach by solving the related Hamilton-Jacobi-Bellman (HJB equation. The results reveal that, with any level of the parameters, an inflation-indexed bond has significant advantage to hedge inflation risk.

  6. Nurses using futuristic technology in today's healthcare setting.

    Science.gov (United States)

    Wolf, Debra M; Kapadia, Amar; Kintzel, Jessie; Anton, Bonnie B

    2009-01-01

    Human computer interaction (HCI) equates nurses using voice assisted technology within a clinical setting to document patient care real time, retrieve patient information from care plans, and complete routine tasks. This is a reality currently utilized by clinicians today in acute and long term care settings. Voice assisted documentation provides hands & eyes free accurate documentation while enabling effective communication and task management. The speech technology increases the accuracy of documentation, while interfacing directly into the electronic health record (EHR). Using technology consisting of a light weight headset and small fist size wireless computer, verbal responses to easy to follow cues are converted into a database systems allowing staff to obtain individualized care status reports on demand. To further assist staff in their daily process, this innovative technology allows staff to send and receive pages as needed. This paper will discuss how leading edge and award winning technology is being integrated within the United States. Collaborative efforts between clinicians and analyst will be discussed reflecting the interactive design and build functionality. Features such as the system's voice responses and directed cues will be shared and how easily data can be documented, viewed and retrieved. Outcome data will be presented on how the technology impacted organization's quality outcomes, financial reimbursement, and employee's level of satisfaction.

  7. Time orientation, planning horizons and responsibility into the future

    International Nuclear Information System (INIS)

    Svenson, O.; Nilsson, G.

    1988-01-01

    Subjects of four categories (social science students, engineering students, retired people and nuclear waste experts) were asked about past events, planning, risks and future time with emphasis on energy related issues and in particular questions concerning spent nuclear waste. Among, the results reported it was found that events in the past were located more or less correctly and that events further back systematically too close to the present. Today's responsibility into the future was judged to cover 3 to 6 generations ahead and an adequate planning horizon for a local community to be on the average 11 to 14 years. Adequate planning horizons for the handling of spent nuclear fuel were judged to be from 100 to 500 years. The responsibility for effects of today's decisions was judged to be from about 100 to 300 years into the future for environmental pollution and from about 50 to 600 years for nuclear waste. However, non-negliqable proportions of the subjects choose a more moral standpoint and gave answers indicating that responsibility had to be unlimited. Some sex differences were found and an interaction with age offered as a hypothesis to be investigated in the future. Interrelations between clusters of questions revealed some links from past time and planning to judgements of environmental and nuclear power related risks. (orig.)

  8. Energy secretary Spencer Abraham announces department of energy 20-year science facility plan

    CERN Multimedia

    2003-01-01

    "In a speech at the National Press Club today, U.S. Energy Secretary Spencer Abraham outlined the Department of Energy's Office of Science 20-year science facility plan, a roadmap for future scientific facilities to support the department's basic science and research missions. The plan prioritizes new, major scientific facilities and upgrades to current facilities" (1 page).

  9. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 2, Technical report

    Energy Technology Data Exchange (ETDEWEB)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-08-01

    This is the second volume of the Phase 1 report and discusses the 10 tasks performed in Phase 1. The objective of this research is to develop a methodology for setting energy design targets to provide voluntary guidelines for the buildings industry. The whole-building energy targets project is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to encourage the construction of energy-efficient buildings by informing designers and owners about cost-effective goals for energy use in new commercial buildings. The outcome of this research will be a flexible methodology for setting such targets. The tasks are listed and discussed in this report as follows: Task 1 - Develop Detailed Project Goals and Objectives; Task 2 - Establish Buildings-Industry Liaison; Task 3 - Develop Approaches to the Energy Targets Model, Building Operations, and Climate; Task 4 - Develop an Approach for Treating Economic Considerations; Task 5 - Develop an Approach for Treating Energy Sources; Task 6 - Collect Energy-Use Data; Task 7 - Survey Energy Expert Opinion; Task 8 - Evaluation Procedure Specification and Integration; Task 9 - Phase 1 Report Development; and Task 10 - Phase 1 Review Planning.

  10. Envolving the Operations of the TerraSAR-X/TanDEM-X Mission Planning System during the TanDEM-X Science Phase

    OpenAIRE

    Stathopoulos, Fotios; Guillermin, Guillaume; Garcia Acero, Carlos; Reich, Karin; Mrowka, Falk

    2016-01-01

    After the successful Global Coverage of the Digital Elevation Model, the TanDEM-X Science phase was initiated in September of 2014, dedicated to the demonstration of innovative techniques and experiments. The TanDEM-X Science phase had a large impact on the TerraSAR-X/TanDEM-X Mission Planning System. The two main challenges were the formation flying changes and the activation of a new acquisition mode, the so called Dual Receive Antenna (DRA) acquisition mode. This paper describes all action...

  11. UK pulls out of plans for ILC

    CERN Multimedia

    Durrani, Matin

    2007-01-01

    "A funding crisis at one of the UK's leading research councils has forced the country to pull out of plans for the International Linear Collider (ILC). The science and Technology Facilities Council (STFC) says in a report published today that it does not see "a practicable path towards the realization of this facility as currently conceived on a reasonable timescale". (1 page)

  12. The National Educational Technology Plan Doesn't Live up to Its Call for Revolutionary Transformation

    Science.gov (United States)

    Rose, Raymond M.

    2011-01-01

    The National Educational Technology Plan (NETP) calls for the revolutionary transformation of the American educational system. The plan correctly points to the decisions of the late 1800s that still direct educational policy today, and correctly calls the school change efforts evolutionary tinkering. The author, a pioneer in online education…

  13. Environmental mining plan of the construction materials industry in Cartagena, Phase 1 Diagnostic. Vol.1 and Vol.2(Annex)

    International Nuclear Information System (INIS)

    Castiblanco, Carmen Rosa; Franco Serna, Jose Vicente; Nino, Jaime

    1996-01-01

    INGEOMINAS carried out this project in the cities of Cartagena, Bucaramanga, Cali and Bogota, in two phases: Phase 1 (Diagnostic) and Phase II (Formulation of Handling Plan). The phase 1 that here is described, it upgrades the knowledge of the extractive industry of the construction materials for the city of Cartagena, through bibliographical revision and field work, carried out in 50 quarries that supply from these materials to the city. This study, besides the economic and legal handling, identifies technical aspects related with the geology, the mining and the environmental situation. In accordance with their likeness, geologic, morphological and of exploitation (extraction methods and mining development), the quarries met in five groups: Exploitations on calcareous deposits of the La Popa Formation, exploitations on clay deposits of the La Popa Formation, exploitations on detritus deposits of half grain to thick (La Popa-Arenosa Formation; Pendales Conglomerate and Rotinet Formation) and exploitation of calcareous of the Arroyo de Piedra Formation. The extraction of these materials is characterized by its low degree of development technician, lack of planning mining, lack of appropriate infrastructure that allows a better development of the sector, is also evident the control lack on the part of the entities in charge of the handling of this industry. These factors added to a demand every time in increase of these materials, they have taken to a progressive deterioration in the landscape, increase of the noise and particles in the air and in the waters. The low control in this activity has generated the proliferation of informal exploitations that they find in this activity a way of subsistence

  14. Mechanical vapor compression refrigeration for low temperature industrial applications today

    International Nuclear Information System (INIS)

    Ferguson, J.E.

    1987-01-01

    If the super conductor industry settles out at a temperature of -100 0 F or above, mechanical refrigeration will be vying for the cooling business. Today there very definitely is a break point in the application of equipment at approximately -120 0 F or 189 0 K. Other technologies are generally utilized below this level. However, with market potential comes invention and breakthroughs in refrigeration can also occur. Today standard refrigeration systems are cost effective, reliable and produced in the millions for high temperature applications of +10 0 F to +40 0 F evaporator temperature. Lower temperatures require additional hardware, consume additional power and are produced today in limited quantities for special applications

  15. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  16. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  17. A Strategic Planning for a College Student-Segment Shopping Mall

    OpenAIRE

    Astri Anindya Sari; Hanson Endra Kusuma; Baskoro Tedjo

    2011-01-01

    In the midst of shopping mall development today, an understanding of consumer behaviors and preferences is absolutely a must if we want to plan successfuly a shopping mall. This knowledge will provide input for strategic planning so that the concept offered for shopping mall development will meet the consumers’ demand and may win the market competition. This study explores the preferences of students in Bandung as one of the potential market segments of the shopping mall. Qualitative study w...

  18. Wood biomass gasification in the world today

    International Nuclear Information System (INIS)

    Nikolikj, Ognjen; Perishikj, Radovan; Mikulikj, Jurica

    1999-01-01

    Today gasification technology of different kinds represents a more and more interesting option of the production of energy forms. The article describes a biomass gasification plant (waste wood) Sydkraft, Vernamo from Sweden. (Author)

  19. Planning for a Better Future: California 2025. 2011 Update

    Science.gov (United States)

    Public Policy Institute of California, 2011

    2011-01-01

    California's current economic and fiscal realities make nonpartisan, objective information on the state's future challenges all the more critical. Understandably, the search is on for immediate solutions to the unprecedented crises people face today. But if the present crises make policymakers shelve long-term planning, the result may be an even…

  20. Land Use Planning and the Consequences of Smart Growth

    Directory of Open Access Journals (Sweden)

    Bob Jentsch

    2006-11-01

    Full Text Available Smart Growth is a current buzzword which implies that all growth is good if it is planned. But urban planning usually fails because it concentrates on each city as the center of its own universe, starting with a downtown and working out. This is unrealistic but common, really a misapplication of the concentric zone theory of the early industrial city to the modern world. The author began his career as a planner with the Pruitt-Igoe project in St. Lewis and uses that as one example of why planning failed then as it continues to do so today. (A video file is included.

  1. Capacity building for sustainable development. One of the five key areas to sustainable development where progress is possible with the resources and technologies at our disposal today

    International Nuclear Information System (INIS)

    2002-01-01

    Today, approximately one third of the world's population lack access to modern energy services. Poverty eradication and sustainable development will require not just access, but also clean and affordable energy services. Expanding access to such services requires careful planning. The International Atomic Energy Agency (IAEA) helps developing countries and economies in transition build their energy planning capabilities with respect to all three pillars of sustainable development - economic, environmental, and social. The Agency develops and transfers planning models tailored to their special circumstances. It transfers the latest data on technologies, resources, and economics. It trains local experts. It jointly analyzes national options and interprets results. And the IAEA helps establish the continuing local planning expertise needed to independently chart national paths to sustainable development

  2. College Savings Plans, Financial Aid, and Tax Strategy

    Science.gov (United States)

    Whiteside, Richard; Mentz, George S.

    2004-01-01

    A college degree is one of the most expensive purchases an American family can make. While today's costs are higher than ever before, parents have many more options whose sheer number and complexity have given rise to a whole new field-financial planning for college. This article, which is based on materials created for the enrollment management…

  3. Groundwater quality assessment plan for the 1324-N/NA Site: Phase 1 (first determination)

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1998-05-01

    The 1324-N Surface Impoundment and 1324-NA Percolation Pond (1324-N/NA Site) are treatment/storage/disposal sites regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). They are located in the 100-N Area of the Hanford Site, and were used to treat and dispose of corrosive waste from a water treatment plant. Groundwater monitoring under an interim-status detection program compared indicator parameters from downgradient wells to background values established from an upgradient well. One of the indicator parameters, total organic carbon (TOC), exceeded its background value in one downgradient well, triggering an upgrade from a detection program to an assessment program. This plan presents the first phase of the assessment program

  4. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  5. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  6. 25 CFR 1000.19 - What is done during the “planning phase”?

    Science.gov (United States)

    2010-04-01

    ....19 What is done during the “planning phase”? The Act requires that all Tribes/Consortia seeking to participate in Tribal self-governance complete a planning phase. During the planning phase, the Tribe... 25 Indians 2 2010-04-01 2010-04-01 false What is done during the âplanning phaseâ? 1000.19 Section...

  7. Today's markets for superconductivity

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    The worldwide market for superconductive products may exceed $1 billion in 1987. These products are expanding the frontiers of science, revolutionizing the art of medical diagnosis, and developing the energy technology of the future. In general, today's customers for superconductive equipment want the highest possible performance, almost regardless of cost. The products operate within a few degrees of absolute zero, and virtually all are fabricated from niobium or niobium alloys-so far the high-temperature superconductors discovered in 1986 and 1987 have had no impact on these markets. The industry shows potential and profound societal impact, even without the new materials

  8. Strategic Planning towards a World-Class University

    Science.gov (United States)

    Usoh, E. J.; Ratu, D.; Manongko, A.; Taroreh, J.; Preston, G.

    2018-02-01

    Strategic planning with a focus on world-class university status is an option that cannot be avoided by universities today to survive and succeed in competition as a provider of higher education. The objective of this research is to obtain exploratory research results on the strategic plans of universities that are prepared to generate world-class university status. This research utilised exploratory qualitative research method and data was collected by in-depth interviews method. Interview transcripts were analyzed by using thematic content analysis through NVivo software analysis and manual systems. The main finding of interview shows that most interviewees agreed that UNIMA has been engaged in strategic planning. Contribution from faculties and schools are acknowledged and inform the planning process. However, a new model of strategic planning should be adopted by UNIMA due to the shift towards a “corporate university”. The finding results from documents, literature review and interview were the addition of world-class university characteristics and features to current strategic planning of UNIMA and how to upgrade by considering to use the characteristics and features towards world-class university.

  9. Identity and Diversity in Today's World

    Science.gov (United States)

    Gee, James Paul

    2017-01-01

    This paper develops a thesis about identity and diversity. I first look at activity-based identities, identities like being a gardener, birder, citizen scientist or fan-fiction writer. These are freely chosen identities and they are proliferating at a great rate today thanks to participatory culture, the Maker Movement and digital and social…

  10. We, John Dewey's Audience of Today

    Science.gov (United States)

    da Cunha, Marcus Vinicius

    2016-01-01

    This article suggests that John Dewey's "Democracy and Education" does not describe education in an existing society, but it conveys a utopia, in the sense coined by Mannheim: utopian thought aims at instigating actions towards the transformation of reality, intending to attain a better world in the future. Today's readers of Dewey (his…

  11. Primary School Leadership Today and Tomorrow

    Science.gov (United States)

    Southworth, Geoff

    2008-01-01

    The article provides a retrospective and prospective view of primary school leadership. It begins with an analytic description of primary school leadership in the recent past. The second part looks at school leadership today, identifies contemporary issues and examines role continuities and changes. The third part looks at what the future might…

  12. Waste retrieval sluicing system vapor sampling and analysis plan for evaluation of organic emissions, process test phase III

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained to address vapor issues related to the sluicing of tank 241-C-106. Sampling will be performed in accordance with Waste Retrieval Sluicing System Emissions Collection Phase III (Jones 1999) and Process Test Plan Phase III, Waste Retrieval Sluicing System Emissions Collection (Powers 1999). Analytical requirements include those specified in Request for Ecology Concurrence on Draft Strategy/Path Forward to Address Concerns Regarding Organic Emissions from C-106 Sluicing Activities (Peterson 1998). The Waste Retrieval Sluicing System was installed to retrieve and transfer high-heat sludge from tank 241-C-106 to tank 241-AY-102, which is designed for high-heat waste storage. During initial sluicing of tank 241-C-106 in November 1998, operations were halted due to detection of unexpected high volatile organic compounds in emissions that exceeded regulatory permit limits. Several workers also reported smelling sharp odors and throat irritation. Vapor grab samples from the 296-C-006 ventilation system were taken as soon as possible after detection; the analyses indicated that volatile and semi-volatile organic compounds were present. In December 1998, a process test (phase I) was conducted in which the pumps in tanks 241-C-106 and 241-AY-102 were operated and vapor samples obtained to determine constituents that may be present during active sluicing of tank 241-C-106. The process test was suspended when a jumper leak was detected. On March 7, 1999, phase I1 of the process test was performed; the sluicing system was operated for approximately 7 hours and was ended using the controlled shutdown method when the allowable amount of solids were transferred to 241-AY-102. The phase II test was successful, however, further testing is required to obtain vapor samples at higher emission levels

  13. The evolving DOT enterprise : today toward tomorrow.

    Science.gov (United States)

    2013-04-01

    Departments of transportation (DOTs) today are being shaped by a wide range of : factors some of which are directly managed and controlled within the transportation : industry while others are external factors shaping the demand for transportatio...

  14. Provincial land use planning in British Columbia

    International Nuclear Information System (INIS)

    Mitchell, W.

    1998-01-01

    The efforts being made to include Aboriginal communities in land use planning in British Columbia are discussed. British Columbia is in the midst of historic changes with respect to land and resource allocation, use and management. Historic trends in land use allocation and management are contrasted with land use planning and resource management of today. The impact of provincial government moves to double park space within the province, and the Protected Areas Strategy initiative will have on the natural gas and petroleum industry is discussed. New efforts being made to include First Nations directly in land use planning discussions in ways that do not prejudice treaty negotiations, are reviewed. Creation of a new Oil and Gas Commission in the Fort St. John area, is cited as the most recent example of the interconnections between First Nations communities and other public and industry stakeholders in land use planning in the province

  15. Cosmological phase transitions

    International Nuclear Information System (INIS)

    Kolb, E.W.

    1987-01-01

    If the universe stated from conditions of high temperature and density, there should have been a series of phase transitions associated with spontaneous symmetry breaking. The cosmological phase transitions could have observable consequences in the present Universe. Some of the consequences including the formation of topological defects and cosmological inflation are reviewed here. One of the most important tools in building particle physics models is the use of spontaneous symmetry breaking (SSB). The proposal that there are underlying symmetries of nature that are not manifest in the vacuum is a crucial link in the unification of forces. Of particular interest for cosmology is the expectation that are the high temperatures of the big bang symmetries broken today will be restored, and that there are phase transitions to the broken state. The possibility that topological defects will be produced in the transition is the subject of this section. The possibility that the Universe will undergo inflation in a phase transition will be the subject of the next section. Before discussing the creation of topological defects in the phase transition, some general aspects of high-temperature restoration of symmetry and the development of the phase transition will be reviewed. 29 references, 1 figure, 1 table

  16. Corrosion issues in nuclear industry today

    International Nuclear Information System (INIS)

    Cattant, F.; Crusset, D.; Feron, D.

    2008-01-01

    In the context of global warming, nuclear energy is a carbon-free source of power and so is a meaningful option for energy production without CO 2 emissions. Currently, there are more than 440 commercial nuclear reactors, accounting for about 15% of electric power generation in the world, and there has not been a major accident in over 20 years. The world's fleet of nuclear power plants is, on average, more than 20 years old. Even though the design life of a nuclear power plant is typically 30 or 40 years, it is quite feasible that many nuclear power plants will be able to operate for longer than this. The re-emergence of nuclear power today is founded on the present generation of nuclear reactors meeting the demands of extended service life, ensuring the cost competitiveness of nuclear power and matching enhanced safety requirements. Nuclear power plant engineers should be able to demonstrate such integrity and reliability of their system materials and components as to enable nuclear power plants to operate beyond their initial design life. Effective waste management is another challenge for sustainable nuclear energy today; more precisely, a solution is needed for the management of high-level and long-lived intermediate-level radioactive waste over the very long term. Most nuclear countries are currently gathering the data needed to assess the feasibility of a deep geological waste repository, including the prediction of the behaviour of materials over several thousands of years. The extended service life of nuclear power plants and the need for permanent disposal for nuclear waste are today's key issues in the nuclear industry. We focus here on the major role that corrosion plays in these two factors, and on the French approaches to these two issues. (authors)

  17. Using Today's Headlines for Teaching Gerontology

    Science.gov (United States)

    Haber, David

    2008-01-01

    It is a challenge to attract undergraduate students into the gerontology field. Many do not believe the aging field is exciting and at the cutting edge. Students, however, can be convinced of the timeliness, relevance, and excitement of the field by, literally, bringing up today's headlines in class. The author collected over 250 articles during…

  18. The Geriatric Child in Today's Culture.

    Science.gov (United States)

    Lamson, Frank E.

    This paper develops the premise that there is today a new "child" in our culture developed in response to expectations of daily functioning, family relationships, societal status, economic level, medical illness, emotional needs, and financial management. This new "child" is a person who has usually passed the age of 65, and has found that the…

  19. Southern forests: Yesterday, today, and tomorrow

    Science.gov (United States)

    R. Neil Sampson

    2004-01-01

    In the 20th century, southern forests changed dramatically. Those changes pale, however, when compared to what happened to the people of the region. In addition to growing over fourfold in numbers, the South's population has urbanized, globalized, and intellectualized in 100 years. Rural and isolated in the 19th century, they are today urban and cosmopolitan. One...

  20. Applying Servant Leadership in Today's Schools

    Science.gov (United States)

    Culver, Mary K.

    2009-01-01

    This book illustrates how the ideal of servant leadership can be applied in your school today. With real-life scenarios, discussions, and self assessments, this book gives practical suggestions to help you develop into a caring and effective servant leader. There are 52 scenarios in this book, focusing on situations as varied as: (1) Dealing with…

  1. The clinician's guide to composing effective business plans.

    Science.gov (United States)

    Ettinger, Alan B; Blondell, Catherine

    2011-01-01

    In today's challenging healthcare environment, clinicians need to understand the fundamentals of financial analysis, which are the underpinnings of their clinical programs, especially when seeking administrative support for new initiatives. The business plan for new clinical program initiatives is composed of diverse elements such as the mission statement, market and competitive analyses, operations plan, and financial analysis. Armed with a basic knowledge of financial analysis of clinical programs, as well as forward-looking analysis of an initiative's added value, the healthcare provider can work much more effectively with administration in developing or creating new healthcare program initiatives.

  2. planning for the automation of the university of dar es salaam library

    African Journals Online (AJOL)

    The paper examines the planning process for the automation of the University of Dar es Salaam Library. The planning phases described include the preparation phase, planning for implementation and database construction. The major issues during the preparation phase are the discussion on the context of automation, ...

  3. Planning of spatial development of tourism based on the example of spatial plan of Subotica municipality

    Directory of Open Access Journals (Sweden)

    Šećerov Velimir

    2008-01-01

    Full Text Available Planning of tourism development and its spatial disposition in Europe and world today are an important segment of the overall economic development. Having in mind its important economic and social functions, as well as its capability to intensify its other economic branches (agricultural and economic potentials, services of various types, transport and other in a certain territory, it is necessary to realize a precise valorization of tourist values in the spatial plan of municipality and to conclude at what point and at which places the tourism can represent on of development components of the entire economy of the territory to be planed. The example of the spatial plan of Subotica and main guidelines, concept and planning priorities which can be expected in the forthcoming period are presented in this paper. It is without any doubt that the municipality of Subotica with its geostrategic position, the proximity of the EU and important natural and cultural tourist potentials is a suitable space for application of contemporary principles of the tourism development planning and their correlation with other segments of integral development for the whole municipality.

  4. Wind power today: 1999 Wind Energy program highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, Pat

    2000-04-06

    Wind Power Today is an annual publication that provides an overview for the Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy for the 21st century. Content objectives include: Educate readers about the advantages and potential for widespread deployment of wind energy; explain DOE wind energy program objectives and goals; describe program accomplishments in research and application; examine the barriers to widespread deployment; describe benefits of continued research and development; facilitate technology transfer; attract cooperative wind energy projects with industry.

  5. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Science.gov (United States)

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  6. Man and electrotechnics today

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-01

    Man and electrotechnique today - this topic was discussed by experts of the VDE (Society of German Electrotechnicians) during a podium discussion directed by the TV-journalist Ruediger Proske. The discussion was centred on the popular questions of energy supply, electronics and the technical communication systems. What are the technologies' influences on our society, how can the social results for the places of employment be estimated and what role is played here by the technicians, the industry and by economy. In the debate which was partly very heated the members showed their anxiety of the negative attitude which society has been developing towards technique to cause big problems for the future.

  7. UPVG phase 2 report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Utility PhotoVoltaic Group (UPVG), supported by member dues and a grant from the US Department of Energy, has as its mission the acceleration of the use of cost-effective small-scale and emerging large-scale applications of photovoltaics for the benefit of electric utilities and their customers. Formed in October, 1992, with the support of the American Public Power Association, Edison Electric Institute, and the National Rural Electric Cooperative Association, the UPVG currently has 90 members from all sectors of the electric utility industry. The UPVG`s efforts as conceived were divided into four phases: Phase 0--program plan; Phase 1--organization and strategy development; Phase 2--creating market assurance; and Phase 3--higher volume purchases. The Phase 0 effort developed the program plan and was completed early in 1993. The Phase 1 goal was to develop the necessary background information and analysis to lead to a decision as to which strategies could be undertaken by utilities to promote greater understanding of PV markets and achieve increased volumes of PV purchases. This report provides the details of the UPVG`s Phase 2 efforts to initiate TEAM-UP, its multiyear, 50-MW hardware initiative.

  8. UPVG phase 2 report

    International Nuclear Information System (INIS)

    1995-08-01

    The Utility PhotoVoltaic Group (UPVG), supported by member dues and a grant from the US Department of Energy, has as its mission the acceleration of the use of cost-effective small-scale and emerging large-scale applications of photovoltaics for the benefit of electric utilities and their customers. Formed in October, 1992, with the support of the American Public Power Association, Edison Electric Institute, and the National Rural Electric Cooperative Association, the UPVG currently has 90 members from all sectors of the electric utility industry. The UPVG's efforts as conceived were divided into four phases: Phase 0--program plan; Phase 1--organization and strategy development; Phase 2--creating market assurance; and Phase 3--higher volume purchases. The Phase 0 effort developed the program plan and was completed early in 1993. The Phase 1 goal was to develop the necessary background information and analysis to lead to a decision as to which strategies could be undertaken by utilities to promote greater understanding of PV markets and achieve increased volumes of PV purchases. This report provides the details of the UPVG's Phase 2 efforts to initiate TEAM-UP, its multiyear, 50-MW hardware initiative

  9. Yesterday's, today's and tomorrow's nuclear tests of India and Pakistan

    International Nuclear Information System (INIS)

    Duval, M.; Le Guelte, G.

    1998-01-01

    This paper presents the historical aspects that led India and Pakistan to develop nuclear weapons and to perform nuclear weapon tests: weapons acquisition: today's military capacity, help from foreign countries; motivations: nuclear programs, geo-political aspects; results and potentialities; consequences for the non-proliferation systems and for the cut-off convention and test-ban treaties; and the geo-strategic consequences of todays's military nuclear capacity of India and Pakistan. (J.S.)

  10. Leadership and the Millennials: Transforming Today's Technological Teens into Tomorrow's Leaders

    Science.gov (United States)

    Wisniewski, Mary Ann

    2010-01-01

    Although older and younger generations unfailingly tend to disagree on values and are inclined to perceive one another with a degree of skepticism and disapproval, it is an unmistakable reality that because of technology today's youth are approaching life differently than previous generations. It is also clear that today's Millennials are…

  11. Route planning with transportation network maps: an eye-tracking study.

    Science.gov (United States)

    Grison, Elise; Gyselinck, Valérie; Burkhardt, Jean-Marie; Wiener, Jan Malte

    2017-09-01

    Planning routes using transportation network maps is a common task that has received little attention in the literature. Here, we present a novel eye-tracking paradigm to investigate psychological processes and mechanisms involved in such a route planning. In the experiment, participants were first presented with an origin and destination pair before we presented them with fictitious public transportation maps. Their task was to find the connecting route that required the minimum number of transfers. Based on participants' gaze behaviour, each trial was split into two phases: (1) the search for origin and destination phase, i.e., the initial phase of the trial until participants gazed at both origin and destination at least once and (2) the route planning and selection phase. Comparisons of other eye-tracking measures between these phases and the time to complete them, which depended on the complexity of the planning task, suggest that these two phases are indeed distinct and supported by different cognitive processes. For example, participants spent more time attending the centre of the map during the initial search phase, before directing their attention to connecting stations, where transitions between lines were possible. Our results provide novel insights into the psychological processes involved in route planning from maps. The findings are discussed in relation to the current theories of route planning.

  12. Michigan dioxin exposure study: planning phase and protocol development

    Energy Technology Data Exchange (ETDEWEB)

    Adriaens, P. [Univ. of Michigan, Coll. of Engineering, Ann Arbor (United States); Garabrant, D.; Franzblau, A. [Univ. of Michigan, School for Public Health, Ann Arbor (United States); Gillespie, B. [Univ. of Michigan, Center for Statistics, Ann Arbor (United States); Lepowski, J. [Univ. of Michigan, Inst. for Social Research, Ann Arbor (United States)

    2004-09-15

    The University of Michigan has been commissioned to conduct one of the largest environmental epidemiology studies (700 residents) of dioxin exposure among the population of Michigan to describe the pattern of serum dioxin levels among adults and to understand the factors that explain variation in serum dioxin levels. The study is being undertaken (2004-2006) in response to concerns among the population of Midland and Saginaw Counties that dioxins from the Dow Chemical Company facilities in Midland have resulted in contamination of areas of the City of Midland and have contaminated the sediments in the Tittabawassee River flood plain. There is concern that body burdens of dioxins are elevated because of environmental contamination. The appropriate way to respond to these concerns is to measure the serum dioxin levels in a probability sample of the population in the region and to estimate each individual's past exposure to various factors that are believed to contribute to the body burden of dioxins. By measuring factors that reflect potential exposure to dioxins through air, water, soil, food intake, occupations, and various recreational activities, we can identify the factors that correlate with (and explain variation in) serum dioxin levels. The central goal of the study is to determine which factors explain variation in serum dioxin levels, and to quantify how much variation each factor explains. This paper provides information on the planning phase, study scope and objectives.

  13. The energy of today and tomorrow

    International Nuclear Information System (INIS)

    Bauquis, E.; Bauquis, P.R.

    2007-01-01

    The authors present a today state of the art concerning the energy domain in the world, offering perspectives on what could be the tomorrow world in matter of energy. They define fundamental notions, the different sources of energy and their price, the energy policies of the different countries and the problem of the consumption impact on the environment. (A.L.B.)

  14. Retail Tactical Planning: An Aligned Process?

    OpenAIRE

    Dreyer , Heidi; Dukovska-Popovska , Iskra; Kiil , Kasper; Kaipia , Riikka

    2016-01-01

    Part 9: Quality in Production Management; International audience; This paper addresses tactical planning in retailing through a case study approach in one grocery retailing company. The issues are how tactical planning is conducted and how the different plans are connected. The study complements earlier retail planning studies by showing the sequence of planning phases and by studying the fragmented plans as a process. The master category planning is important and sets borders for the other p...

  15. Sustainability in urban transport plans. Case study: Monorail in a hillside area in Medellin

    Energy Technology Data Exchange (ETDEWEB)

    Pineda Jaramillo, J.D.

    2016-07-01

    One of the most important concepts today is the incorporation of sustainability in urban transport plans. This paper presents the importance that sustainable urban transport plans must have on mobility policy in cities. It also shows the factors that make a transportation mode like urban railway be sustainable. Finally, the Monorail project in the Metropolitan Green Belt (Medellín-Colombia) is presented, showing its implication on the mobility in this low-income region and its integration with urban and regional plans. (Author)

  16. The Genetic Code: Yesterday, Today and Tomorrow

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 17; Issue 12. The Genetic Code: Yesterday, Today and Tomorrow. Jiqiang Ling Dieter Söll. General Article Volume 17 Issue 12 December 2012 pp 1136-1142. Fulltext. Click here to view fulltext PDF. Permanent link:

  17. Setup planning for machining

    CERN Document Server

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  18. Wind Power Today: 2000 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, W.

    2001-05-08

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry.

  19. Gilson, Krapiec and Christian Philosophy Today

    Directory of Open Access Journals (Sweden)

    Pawel Tarasiewicz

    2015-12-01

    Full Text Available The author undertakes an attempt to answer the following question: is Christian philosophy possible today? The question seems to be of great importance due to the fact that what Christians who try to do philosophy usually encounter is bitter criticism which comes to them from two sides at once: that of academy and that of the Church. In short, for academy their philosophy is too Christian, and for the Church it is too academic. Being indebted to the insights of Étienne Gilson and Mieczyslaw A. Krapiec (the original Polish spelling: Mieczysław Albert Krąpiec, pronounced: myechisuaf albert krompyetz, the author comes to the conclusion thatChristian philosophy is possible today only if: 1 it isnot identified with the art of persuasion, as its final end lies in gaining understanding rather than being convincing, 2 itis the work of a Christian, and 3 it has thereal world as its object and metaphysics as its method. ForChristian philosophy—which in essence consists indoing philosophy by Christians in order to get morerational understanding of their religious faith—shouldbe identified with theperfection of the intellect achieved by practicingthe classical philosophy of being.

  20. PLANNING INTELLIGENCE ACTIVITIES IN A DYNAMIC SECURITY ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Anca Pavel

    2016-10-01

    Full Text Available The hypothesis introduced by this article is that, in order to perform intelligence missions and to obtain valuable intelligence for the consumers it is necessary to implement processes and tools to support planning activities. Today's challenges consist rather in the ability of intelligence organizations to identify and initiate new connections, processes and communication flows with other partners operating in the security environment than to plan in their own name secret operations. From this point of view, planning activities should focus on new procedures, at a much more extensive level in order to align institutional efforts beyond the boundaries of their own organization and the national community of information. Also, in order to coordinate intelligence activities, strategic planning must be anchored into a complex analysis of the potential impact of existing and possible future global phenomena that shape the security environment and thus identify better ways of improving results.

  1. Best management practices plan for Phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and groundwater contamination and develop remedies to protect human health and the environment. The western end of the site is known to have a former nitric acid disposal pit that has been remediated and capped. Remedial investigation data indicate this pit was a source of nitrate, uranium, technetium, and other metals contamination in groundwater. The downgradient receptor of this contamination includes Bear Creek and its tributaries. A feasibility study is underway to develop a remedy to prevent further contaminant migration to this receptor. To support the feasibility study, a treatability study is being completed to examine groundwater treatment at the S-3 site. This document serves as the top level command medium for Phase II and as such will be the primary resource for management and implementation of field activities. Many of the details and standard operating procedures referred within this document can be found in other Lockheed Martin Energy Systems (Energy Systems) documents. Several supporting documents specific to this project are also cited. These include the Sampling and Analysis Plan (SAP), the Health and Safety Plan (HASP), and the Waste Management Plan (WMP). Section 1 describes the results of Phase I efforts. Section 2 describes the objectives of Phase II. Section 3 provides details of field testing. Section 4 addresses the HASP. Section 5 describes the SAP. Section 6 introduces the WMP. Environmental compliance issues are discussed in Section 7, and sediment and erosion control is addressed in Section 8. Information about the project team is provided in Section 9

  2. Learning strategies in the planning and evaluation phase of image production

    International Nuclear Information System (INIS)

    Larsson, W.; Aspelin, P.; Lundberg, N.

    2013-01-01

    This paper identifies, describes and analyses radiographers' learning strategies in practice. These strategies are particularly important in the light of the great changes in radiology departments and the role of radiographers during the past two decades. With increased responsibility for quality assurance and diagnostic work, radiographers need to develop specific skills over time, which requires learning strategies in practice. The aim of this study is to identify, describe and analyze the learning strategies of novice and experienced radiographers in the planning and evaluation phase of image production. This study found that novice radiographers; use memorization combined with logical reasoning, apply focused observation, selective reading and information-seeking, communicate through: active and attentive listening, asking questions, receiving feedback, discussing problems and speak out loud. Experienced radiographers; use memorization in combination with logical reasoning and predicting, observe discriminating, read selectively, validate information and perform information-seeking. They communicate through: listening analyzing and demanding way, answering questions and providing feed-back and discussing problems. This study concludes that the difference between the learning strategies of novice and experienced radiographers is in the way they apply the strategies rather than the strategies themselves

  3. The AFIT of Today is the Air Force of Tomorrow

    Science.gov (United States)

    2012-05-11

    marketing 5/11/2012 9 The AFIT of today is the Air Force of tomorrow. 1 Air University: The Intellectual and Leadership Center of the Air Force Aim High...Center of the Air Force Aim High…Fly - Fight - Win The AFIT of Today is the Air Force of Tomorrow. LS Accomplishments • Initiated market -based, fee-for...USAFA Swarming Formation Flying Sponsor: SMC Space Traffic Control Iridium and Globalstar Modems Sponsor: AFRL/RV; SMC/ STP CubeSat Plume Detector

  4. Quantum phase transitions

    International Nuclear Information System (INIS)

    Sachdev, S.

    1999-01-01

    Phase transitions are normally associated with changes of temperature but a new type of transition - caused by quantum fluctuations near absolute zero - is possible, and can tell us more about the properties of a wide range of systems in condensed-matter physics. Nature abounds with phase transitions. The boiling and freezing of water are everyday examples of phase transitions, as are more exotic processes such as superconductivity and superfluidity. The universe itself is thought to have passed through several phase transitions as the high-temperature plasma formed by the big bang cooled to form the world as we know it today. Phase transitions are traditionally classified as first or second order. In first-order transitions the two phases co-exist at the transition temperature - e.g. ice and water at 0 deg., or water and steam at 100 deg. In second-order transitions the two phases do not co-exist. In the last decade, attention has focused on phase transitions that are qualitatively different from the examples noted above: these are quantum phase transitions and they occur only at the absolute zero of temperature. The transition takes place at the ''quantum critical'' value of some other parameter such as pressure, composition or magnetic field strength. A quantum phase transition takes place when co-operative ordering of the system disappears, but this loss of order is driven solely by the quantum fluctuations demanded by Heisenberg's uncertainty principle. The physical properties of these quantum fluctuations are quite distinct from those of the thermal fluctuations responsible for traditional, finite-temperature phase transitions. In particular, the quantum system is described by a complex-valued wavefunction, and the dynamics of its phase near the quantum critical point requires novel theories that have no analogue in the traditional framework of phase transitions. In this article the author describes the history of quantum phase transitions. (UK)

  5. Man and electrotechnics today

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Man and electrotechnique today - this topic was discussed by experts of the VDE (Society of German Electrotechnicians) during a podium discussion directed by the TV-journalist Ruediger Proske. The discussion was centred on the popular questions of energy supply, electronics and the technical communication systems. What are the technologies' influences on our society, how can the social results for the places of employment be estimated and what role is played here by the technicians, the industry and by economy. In the debate which was partly very heated the members showed their anxiety of the negative attitude which society has been developing towards technique to cause big problems for the future. (orig.) [de

  6. Lecture programme The reality of science today

    CERN Multimedia

    2007-01-01

    What are the new challenges and realities facing scientific research? What is its place in society today? To answer these questions, the History and Philosophy of Sciences Unit of Geneva University, in collaboration with ASPERA, the European network for astroparticle physics research, has organised a programme of lectures entitled La réalité de la science d’aujourd’hui, enjeux et défis de la diversité. This series of lectures will provide researchers and members of the public with a snapshot of the state of science today from the perspective of laboratories and institutes, and on subjects such as funding policy and technological and legal impact. The first lecture will be given by science historian Dominique Pestre (EHESS & Centre Koyré, Paris), renowned for his contributions to the analysis of science past and present, and notably one of the authors of the work "History of CERN". He will discuss the modern methods of producing scientific knowledge which have been develop...

  7. The ASME Code today -- Challenges, threats, opportunities

    International Nuclear Information System (INIS)

    Canonico, D.A.

    1995-01-01

    Since its modest beginning as a single volume in 1914 the ASME Code, or some of its parts, is recognized today in 48 of the United States and all providence's of Canada. The ASME Code today is composed of 25 books including two Code Case books. These books cover the new construction of boilers and pressure vessels and the new construction and In-Service-Inspection of Nuclear Power Plant components. The ASME accredits all manufacturers of boilers and pressure vessels built to the ASME Code. There are approximately 7650 symbol stamps issued throughout the world. Over 23% of the symbol stamps have been issued outside the USA and Canada. The challenge to the ASME Code is to be accepted as the world standard for pressure boundary components. There are activities underway to achieve that goal. The ASME Code is being revised to make it a more friendly document to entities outside of North America. To achieve that end there are specific tasks underway which are described here

  8. Announcing the Sociation Today Urban Sociology and Reprint Collection Series

    Directory of Open Access Journals (Sweden)

    George H. Conklin

    2007-11-01

    Full Text Available "Sociation Today" is happy to announce the Urban Sociology Reprint Series. Other reprints will be focused on DuBois and his work available on-line, while the Max Weber video now has its own page. Articles printed in the current and past issues of Sociation Today have been gathered together in one place so they can be viewed conviently. The MENU link to the left will direct you to the proper place, as will the link above (for the urban reprints. The files will enable you to see the articles on a specific topic in one place, and also will enable the professor to assign the articles easily in classes. As an open access journal, Sociation Today's goal remains to provide scholars, the public and students with refereed articles exploring the nature of society and its interactions at no charge, unlike traditional journals and JSTOR.

  9. An intelligent spatial land use planning support system using socially rational agents

    NARCIS (Netherlands)

    Ghavami, S.M.; Taleai, M.; Arentze, T.A.

    2017-01-01

    This research presents an intelligent planning support system based on multi-agent systems for spatial urban land use planning. The proposed system consists of two main phases: a pre-negotiation phase and an automated negotiation phase. The pre-negotiation phase involves interaction between human

  10. The approach to regional planning in Natal

    Directory of Open Access Journals (Sweden)

    E. Thorrington-Smith

    1965-03-01

    Full Text Available Limitations on the development of regional planning in the Republic are no longer due to lack of public interest or the availability of funds, but rather to a tragic shortage of men and women trained to undertake the work. While being conscious and most appreciative of the great honour and kindness extended to me by the University of Potchefstroom in inviting me to address so distinguished a company today, may I also say what a great pleasure it is to be present at the inauguration of an Institute for Regional Planning which will have as one of its main objects, the training of regional planners to help meet South Africa’s needs.

  11. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  12. Treatment of Solar Generation in Electric Utility Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  13. Achieving Aeronautics Leadership: Aeronautics Strategic Enterprise Plan

    Science.gov (United States)

    1995-01-01

    Today, more than ever, aggressive leadership is required to ensure that our national investments in aeronautical research, technology, and facilities are shaped into a coordinated, and high-impact, strategy. Under the auspices of the National Science and Technology Council, and in conjunction with the domestic industry, universities, the Department of Defense, and the Federal Aviation Administration - our partners in aeronautics - we propose to provide that leadership, and this document is our plan.

  14. Palestinian-Israeli Scenario Planning - Phase II | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    As currently foreseen, neither the two-state nor the one-state solution offers much hope of resolving the Israeli-Palestinian conflict. The Scenario Planning Program of the Strategic Assessments Initiative (SAI) aims to launch a deeper examination of what a sustainable solution requires by shifting the debate from the ...

  15. Pregnancy outcomes in youth with type 2 diabetes: The TODAY Study experience

    Science.gov (United States)

    We evaluated pregnancy outcomes, maternal and fetal/neonatal, during the Treatment Options for type 2 Diabetes in Adolescents and Youth (TODAY) study. The TODAY study was a randomized controlled trial comparing three treatment options for youth with type 2 diabetes. Informed consent included the req...

  16. Waste Isolation Pilot Plant Strategic Plan

    International Nuclear Information System (INIS)

    1993-03-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Strategic Plan is to provide decision makers, project participants, and the public with a high-level overview of the objectives, issues, and strategiesthat impact a decision on the suitability of WIPP as a permanent, safe disposal facility for transuranic (TRU) waste that has resulted from defense activities. This document is a component of an integrated planning process and is a key management tool that is coordinated and consistent with the Secretary's Disposal Decision Plan and the Environmental Restoration and Waste Management (EM) Five-Year Plan. This documentsupports other US Department of Energy (DOE) planning efforts, including the TRU Waste Program. The WIPP Strategic Plan addresses the WIPP Program Test Phase, Disposal Decision, Disposal Phase, and Decommissioning Phase (decontamination and decommissioning). It describes the actions and activities that the DOE will conduct to ensure that WIPP will comply with applicable, relevant, and appropriate requirements of the US Environmental Protection Agency (EPA), State of New Mexico, and other applicable federal and state regulations. It also includes the key assumptions under which the strategy was developed. A comprehensive discussion of the multitude of activities involved in the WIPP Program cannot be adequately presented in this document. The specific details of these activities are presented in other, more detailed WIPP planningdocuments

  17. Multi-criteria Generation-Expansion Planning with Carbon dioxide emissions and Nuclear Safety considerations

    International Nuclear Information System (INIS)

    Lee, Hun Gyu; Kim, Young Chang

    2010-01-01

    A multiple criteria decision making (MCDM) method is developed to aid decision makers in Generation Expansion planning and management. Traditionally, the prime objective of an electric utility's generation-expansion planning has been to determine the minimum cost supply plans that meet expected demands over a planning horizon (typically 10 to 30 years). Today, however, the nature of decision environments has changed substantially. Increased policy attention is given to solve the multiple tradeoff function including environmental and social factors as well as economic one related to nuclear power expansion. In order to deal with this MCDM problem, the Analytic Hierarchy Process (AHP) Model is applied

  18. Energy for tomorrow - planning of today

    International Nuclear Information System (INIS)

    Goergmaier, D.; Scholz, L.; Bayer, A.; Schmidtner, F.X.; Gottschlich, H.; Reiter, K.; Birkhofer, A.; Mansfeld, G.; Hofrichter, E.; Renn, O.

    1978-01-01

    The present book, which has many maps and coloured illustrations, shows the many facets of the Federal Republic of Germany and EC energy policy. Apart from the fundamental problem of economic growth and future energy demand, present alternatives to nuclear power are presented and the limitations of primary energy carriers are pointed out. A team of twelve authors from science research, industry, and administrative authorities introduces the reader to all problems of nuclear power, from the basics of reactor functioning to reactor types, siting, and reactor technology. Problems of environmental protection (immission protection, avoiding water pollution and heat-up, local climate, etc.) are discussed in detail in the context of power generation from coal and nuclear energy. (orig./UA) [de

  19. LANDSCAPE PLANNING IN UKRAINE: THE FIRST LANDSCAPE-PLANNING PROGRAM

    Directory of Open Access Journals (Sweden)

    Leonid Rudenko

    2013-01-01

    Full Text Available The paper presents the results of the first, in Ukraine; project on landscape planning widely accepted in European countries. Under the project implemented in 2010–2013, a landscape-planning program has been developed for the Cherkassy oblast. This is the first document of this kind in Ukraine. The program is mainly based on the experience of the German and Russian schools of landscape planning and on research and assessment conducted by the authors, which allowed identifying approaches to landscape planning, principles of the national policy, and characteristics and potential of environmentally friendly planning in Ukraine. The paper discusses the main phases of the work on the development of the landscape program for the oblast. It also identifies the main stages and key concepts and principles of landscape planning. The paper presents the results of integrated research on the identification and classification of conflicts in land use and the integral concept of the developmental goals for the oblast. The results can be the foundation for adopting management decisions and development of action plans for the lower hierarchal branches.

  20. Phases of QCD: Summary of the Rutgers Long Range Plan Town Meeting, January 12-14, 2007

    International Nuclear Information System (INIS)

    Jacobs, Peter; Kharzeev, Dmitri; Muller, Berndt; Nagle, Jamie; Rajagopal, Krishna; Vigdor, Steve

    2007-01-01

    This White Paper summarizes the outcome of the Town Meeting on Phases of QCD that took place January 12-14, 2007 at Rutgers University, as part of the NSAC 2007 Long Range Planning process. The meeting was held in conjunction with the Town Meeting on Hadron Structure, including a full day of joint plenary sessions of the two meetings. Appendix A.1 contains the meeting agenda. This Executive Summary presents the prioritized recommendations that were determined at the meeting. Subsequent chapters present the essential background to the recommendations. While this White Paper is not a scholarly article and contains few references, it is intended to provide the non-expert reader

  1. Phases of QCD: Summary of the Rutgers Long Range Plan Town Meeting, January 12-14, 2007

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, Peter; Kharzeev, Dmitri; Muller, Berndt; Nagle, Jamie; Rajagopal, Krishna; Vigdor, Steve

    2007-05-14

    This White Paper summarizes the outcome of the Town Meeting on Phases of QCD that took place January 12-14, 2007 at Rutgers University, as part of the NSAC 2007 Long Range Planning process. The meeting was held in conjunction with the Town Meeting on Hadron Structure, including a full day of joint plenary sessions of the two meetings. Appendix A.1 contains the meeting agenda. This Executive Summary presents the prioritized recommendations that were determined at the meeting. Subsequent chapters present the essential background to the recommendations. While this White Paper is not a scholarly article and contains few references, it is intended to provide the non-expert reader

  2. Alternative motor fuels today and tomorrow

    International Nuclear Information System (INIS)

    Bensaid, B.

    2004-01-01

    Today, petroleum products account for 97% of the energy consumed in road transport. The purpose of replacing these products with alternative energies is to reduce oil dependence as well as greenhouse gas emissions. The high price of oil has promoted the use of 'conventional' alternative motor fuels (biofuels, LPG, NGV) and also renewed interest in syn-fuels (GTL, CTL, BTL) that have already given rise to industrial and pilot projects. (author)

  3. Europa Heute: Filmbegleitheft (Europe Today: Film Manual).

    Science.gov (United States)

    Freudenstein, Reinhold; And Others

    This teacher's guide to the German promotional film "Europe Today", suitable for use in advanced courses, concentrates on linguistic preparation required for full appreciation. The film focuses on the role of European countries as participating members of the Common Market. The manual includes information on the German film industry, a…

  4. EMI Registry Development Plan

    CERN Document Server

    Memon, S.; Szigeti, G.; Field, L.

    2012-01-01

    This documents describes the overall development plan of the EMI Registry product, the plan focuses on the realisation of the EMI Registry specification as defined in the document. It is understood that during the course of the development phase the specification will likely evolve and the changes will be fed into the specification document.

  5. Project summary plan for HTGR recycle reference facility

    International Nuclear Information System (INIS)

    Baxter, B.J.

    1979-11-01

    A summary plan is introduced for completing conceptual definition of an HTGR Recycle Reference Facility (HRRF). The plan describes a generic project management concept, often referred to as the requirements approach to systems engineering. The plan begins with reference flow sheets and provides for the progressive evolution of HRRF requirements and definition through feasibility, preconceptual, and conceptual phases. The plan lays end-to-end all the important activities and elements to be treated during each phase of design. Identified activities and elements are further supported by technical guideline documents, which describe methodology, needed terminology, and where relevant a worked example

  6. SU-B-BRA-00: The Medical Physicist Value Proposition for Tomorrow and Today

    International Nuclear Information System (INIS)

    Sherouse, G.

    2016-01-01

    In the current rapidly changing Healthcare environment, many groups are competing for limited resources. How can medical physicists position themselves to be a relevant stakeholder in the discussion of how those resources are allocated Our value goes beyond what can be shown in a business plan and is heavily involved with safety and quality. Three areas will be explored: What is our value? Who needs to receive that message? How do we communicate that message? To help frame the discussion in terms of how other stakeholders may view the value of medical physicists, a physician and an administrator will present their perspective. Lastly, a multidisciplinary panel will present real life examples of strategies that can be utilized today to establish the value of medical physicists. The presentation of these examples will lead into an interactive question and answer time. V. Willcut, I work for Elekta. There was no research associated with this talk.

  7. SU-B-BRA-02: The Medical Physics Value Proposition for Tomorrow and Today

    Energy Technology Data Exchange (ETDEWEB)

    White, G. [Colorado Associates in Medical Physics (United States)

    2016-06-15

    In the current rapidly changing Healthcare environment, many groups are competing for limited resources. How can medical physicists position themselves to be a relevant stakeholder in the discussion of how those resources are allocated Our value goes beyond what can be shown in a business plan and is heavily involved with safety and quality. Three areas will be explored: What is our value? Who needs to receive that message? How do we communicate that message? To help frame the discussion in terms of how other stakeholders may view the value of medical physicists, a physician and an administrator will present their perspective. Lastly, a multidisciplinary panel will present real life examples of strategies that can be utilized today to establish the value of medical physicists. The presentation of these examples will lead into an interactive question and answer time. V. Willcut, I work for Elekta. There was no research associated with this talk.

  8. SU-B-BRA-00: The Medical Physicist Value Proposition for Tomorrow and Today

    Energy Technology Data Exchange (ETDEWEB)

    Sherouse, G. [Landauer Medical Physics, Glenwood, IL (United States)

    2016-06-15

    In the current rapidly changing Healthcare environment, many groups are competing for limited resources. How can medical physicists position themselves to be a relevant stakeholder in the discussion of how those resources are allocated Our value goes beyond what can be shown in a business plan and is heavily involved with safety and quality. Three areas will be explored: What is our value? Who needs to receive that message? How do we communicate that message? To help frame the discussion in terms of how other stakeholders may view the value of medical physicists, a physician and an administrator will present their perspective. Lastly, a multidisciplinary panel will present real life examples of strategies that can be utilized today to establish the value of medical physicists. The presentation of these examples will lead into an interactive question and answer time. V. Willcut, I work for Elekta. There was no research associated with this talk.

  9. A distributed planning concept for Space Station payload operations

    Science.gov (United States)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  10. Ontological Models to Support Planning Operations, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  11. Ontological Models to Support Planning Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  12. Organization and planning of conferences

    International Nuclear Information System (INIS)

    Hudson, S.R.

    1976-05-01

    The author uses as an example of conference planning The First International Topical Conference on Electron Beam Research and Technology which was held in Albuquerque, New Mexico, November 3-6, 1975. Guidelines are given through all phases of planning up to and during the meeting

  13. Decommissioning plan and current status of JRR-2

    International Nuclear Information System (INIS)

    Kishimoto, Katsumi; Banba, Masao; Arigane, Kenji

    1999-01-01

    Japan Research Reactor No.2 (JRR-2), heavy water moderated and cooled tank type research reactor with maximum thermal power of 10 MW, was used over 36 years, and was permanently shut down in December, 1996. Afterward, dismantling report was submitted to the STA, and dismantling was begun in 1997. Decommissioning of JRR-2 is planned in 11 years, and the program are divided into 4 phases. Phase l had already been ended, phase 2 is being executed at present. Reactor body will be removed in phase 4 by one piece removal or caisson techniques. On reactor building, it is planned to use effectively as a hot experimental facilities after decommissioning ends. For ensuring safety under decommissioning, detailed examination on work method, exposure and radioactive waste quantities is executed on each dismantling in advance. On exposure of worker in phase 1, it was achieved to control lower than the estimate. How to treat tritium contamination also becomes an important problem to achieve ensuring safety. On heavy water, transportation to foreign country is planned in phase 2. On primary cooling system and reactor building concrete, various investigation and examination is being advanced aiming at phase 3 and 4. (author)

  14. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    Science.gov (United States)

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  15. Language Planning and the British Empire: Comparing Pakistan, Malaysia, and Kenya.

    Science.gov (United States)

    Powell, Richard

    2002-01-01

    Provides historical context for discussions of language planning in postcolonial societies by focusing on policies that have influenced language in three former British colonies. Suggests British colonialism, along with the emergence of America in the 20th century, is the main reason for the global role played by English today and an indispensable…

  16. The U.S. Constitution in Today's World.

    Science.gov (United States)

    Patrick, John J.

    A comparative study of constitutions and governments in world history is a key to deeper understanding of the U.S. Constitution. While many countries have constitutions, the United States is among a minority of nations in today's world that has a constitutional government. Many nations' constitutions truly guarantee few protections of individual…

  17. Organization management today: setting the human resource ...

    African Journals Online (AJOL)

    The paper's discussion focuses on the way the world we live in is being transformed under our own very eyes by factors and forces which are so compelling and overwhelming, in their ramifications. The environment in which business and management are carried on today is becoming more and more complex by the day.

  18. Secondary School Administration in Anambra State Today ...

    African Journals Online (AJOL)

    The study, a descriptive survey research design was used to identify the challenges that impede secondary school administration today in Anambra State. The population of the study was all the 259 public secondary school principals in the state. Two research questions and two null hypotheses guided the study. A 20-item ...

  19. Plan for gas overcrowding; Development in last decade

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    The plan for gas overcrowding, is one of the most important determinations of energy politics in last decade. It is an integral plan of consumption of combustible gas; that is to say, cover the natural gas and the liquefied gas of petroleum. In this article, the UPME wants to show the results of the implementation of this measure. The analysis shows, in the first place the impact achieved in the diversification of the energetic basket, with the penetration of the combustible gas. Facts and indicators of development of the plan are given that include an evaluation of the direct financial benefit that receive the homes, when using a more economic fuel. On the other hand, it puts on of present the government effort carried out through ECOPETROL and that of some private agents to start the plan. Finally, the investments made until today and the problems of low use of some nets of transport, related with the development of the market

  20. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  1. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-10-12

    . This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by

  2. Transuranic waste: long-term planning

    International Nuclear Information System (INIS)

    Young, K.C.

    1985-07-01

    Societal concerns for the safe handling and disposal of toxic waste are behind many of the regulations and the control measures in effect today. Transuranic waste, a specific category of toxic (radioactive) waste, serves as a good example of how regulations and controls impact changes in waste processing - and vice versa. As problems would arise with waste processing, changes would be instituted. These changes improved techniques for handling and disposal of transuranic waste, reduced the risk of breached containment, and were usually linked with regulatory changes. Today, however, we face a greater public awareness of and concern for toxic waste control; thus, we must anticipate potential problems and work on resolving them before they can become real problems. System safety analyses are valuable aids in long-term planning for operations involving transuranic as well as other toxic materials. Examples of specific system safety analytical methods demonstrate how problems can be anticipated and resolution initiated in a timely manner having minimal impacts upon allocation of resource and operational goals. 7 refs., 1 fig

  3. Promotional Strategy Planning for DOCI RAMEN

    OpenAIRE

    Putri, Nissa Pratama; Syarief, Achmad

    2013-01-01

    The culinary world today is growing rapidly along with the progress of time. Doci Ramen is one of the businesses that operate in middle 2012. On the other hand, the promising oppurtunity creates a whole different level of competition in this market. With so many competitors offering similar products, Doci Ramen has to come up with an execellent business plan to survive the harsh rivalry. So far, doci rame has not reached its target and still pretty unheard of the study was conducted on Doci R...

  4. Web publishing today and tomorrow

    CERN Document Server

    Lie, Hakon W

    1999-01-01

    The three lectures will give participants the grand tour of the Web as we know it today, as well as peeks into the past and the future. Many three-letter acronyms will be expanded, and an overview will be provided to see how the various specifications work together. Web publishing is the common theme throughout the lectures and in the second lecture, special emphasis will be given to data formats for publishing, including HTML, XML, MathML and SMIL. In the last lectures, automatic document manipulation and presentation will be discussed, including CSS, DOM and XTL.

  5. Vaccination ecosystem health check: achieving impact today and sustainability for tomorrow.

    Science.gov (United States)

    Saadatian-Elahi, Mitra; Bloom, David; Plotkin, Stanley; Picot, Valentina; Louis, Jacques; Watson, Michael

    2017-01-01

    Vaccination is a complex ecosystem with several components that interact with one another and with the environment. Today's vaccine ecosystem is defined by the pursuit of polio eradication, the drive to get as many of the new vaccines to as many people as possible and the research and development against immunologically challenging diseases. Despite these successes, vaccine ecosystem is facing keys issues with regard to supply/distribution and cost/profitability asymmetry that risk slowing its global growth. The conference "Vaccination ecosystem health check: achieving impact today and sustainability for tomorrow" held in Annecy-France (January 19-21, 2015) took stock of the health of today's vaccination ecosystem and its ability to reliably and sustainably supply high-quality vaccines while investing in tomorrow's needed innovation. Small and decreasing numbers of suppliers/manufacturing facilities; paucity of research-driven companies; regulatory pressures; market uncertainties; political prioritization; anti-vaccine movements/complacency; and technological and programmatic issues were acknowledged as the major challenges that could weaken today's vaccination ecosystem. The expert panel discussed also drivers and barriers to a sustainable vaccination ecosystem; the metrics of a vaccination ecosystem; and what should be added, removed, increased, or reduced to maintain the health of the vaccination ecosystem.

  6. Adaptive/Nonadaptive Proton Radiation Planning and Outcomes in a Phase II Trial for Locally Advanced Non-small Cell Lung Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Koay, Eugene J.; Lege, David [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Mohan, Radhe [Department of Radiation Physics, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Komaki, Ritsuko; Cox, James D. [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Chang, Joe Y., E-mail: jychang@mdanderson.org [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)

    2012-12-01

    Purpose: To analyze dosimetric variables and outcomes after adaptive replanning of radiation therapy during concurrent high-dose protons and chemotherapy for locally advanced non-small cell lung cancer (NSCLC). Methods and Materials: Nine of 44 patients with stage III NSCLC in a prospective phase II trial of concurrent paclitaxel/carboplatin with proton radiation [74 Gy(RBE) in 37 fractions] had modifications to their original treatment plans after re-evaluation revealed changes that would compromise coverage of the target volume or violate dose constraints; plans for the other 35 patients were not changed. We compared patients with adaptive plans with those with nonadaptive plans in terms of dosimetry and outcomes. Results: At a median follow-up of 21.2 months (median overall survival, 29.6 months), no differences were found in local, regional, or distant failure or overall survival between groups. Adaptive planning was used more often for large tumors that shrank to a greater extent (median, 107.1 cm{sup 3} adaptive and 86.4 cm{sup 3} nonadaptive; median changes in volume, 25.3% adaptive and 1.2% nonadaptive; P<.01). The median number of fractions delivered using adaptive planning was 13 (range, 4-22). Adaptive planning generally improved sparing of the esophagus (median absolute decrease in V{sub 70}, 1.8%; range, 0%-22.9%) and spinal cord (median absolute change in maximum dose, 3.7 Gy; range, 0-13.8 Gy). Without adaptive replanning, target coverage would have been compromised in 2 cases (57% and 82% coverage without adaptation vs 100% for both with adaptation); neither patient experienced local failure. Radiation-related grade 3 toxicity rates were similar between groups. Conclusions: Adaptive planning can reduce normal tissue doses and prevent target misses, particularly for patients with large tumors that shrink substantially during therapy. Adaptive plans seem to have acceptable toxicity and achieve similar local, regional, and distant control and overall

  7. A key to success: optimizing the planning process

    Science.gov (United States)

    Turk, Huseyin; Karakaya, Kamil

    2014-05-01

    By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air

  8. 78 FR 49726 - International Framework for Nuclear Energy Cooperation Finance/Regulatory/Energy Planning...

    Science.gov (United States)

    2013-08-15

    ..., (2) government commitment and support, and (3) a sound business plan. This workshop will be designed... power purchase agreements, are playing today in the financing of nuclear power projects in emerging... opportunity to network, build relationships in the global civil nuclear sector and learn more about current...

  9. EURO - Before Yesterday, Yesterday, Today, Tomorrow...

    OpenAIRE

    Sylwia Pangsy-Kania

    2002-01-01

    The article was divided into four integrally connected parts concerning the EURO: before yesterday, yesterday, today and tomorrow. On the 1st January 2002 the common European currency became a fact. In eleven European countries there appeared jointly over 13 billion banknotes and 76 billion coins. The introduction of a common currency in the countries of the European Union is the greatest financial operation in world history with such a huge scale and degree of complication. Before yesterdayŠ...

  10. Basic simulation models of phase tracking devices using Matlab

    CERN Document Server

    Tranter, William

    2010-01-01

    The Phase-Locked Loop (PLL), and many of the devices used for frequency and phase tracking, carrier and symbol synchronization, demodulation, and frequency synthesis, are fundamental building blocks in today's complex communications systems. It is therefore essential for both students and practicing communications engineers interested in the design and implementation of modern communication systems to understand and have insight into the behavior of these important and ubiquitous devices. Since the PLL behaves as a nonlinear device (at least during acquisition), computer simulation can be used

  11. 20 strategies for marketing your managed care plan.

    Science.gov (United States)

    Firshein, J

    1996-01-01

    In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest.

  12. IAEA Board of Governors approves IAEA action plan to combat nuclear terrorism

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA Board of Governors today approved in principal an action plan designed to upgrade worldwide protection against acts of terrorism involving nuclear and other radioactive materials. In approving the plan, the Board has recognized that the first line of defense against nuclear terrorism is the strong physical protection of nuclear facilities and materials. 'National measures for protecting nuclear material and facilities are uneven in their substance and application,' the IAEA says. 'There is wide recognition that the international physical protection regime needs to be strengthened.'

  13. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  14. Energy financing in today's world - a banker's viewpoint

    International Nuclear Information System (INIS)

    Mackrell, Ian

    1991-01-01

    If the world runs on energy, the energy industry runs on finance. Supplying the industry's huge appetite for funds -on the scale and in the form required - has always posed a major challenge to the international banking community. But in some respects that challenge is greater today than it has ever been, not only because of the industry's escalating requirements but also because of the way bank's attitudes have been changing in the recent past. One reason for this is the rapidly evolving scene within the energy business in response to the harsher competitive conditions and the greater uncertainties of tomorrow. However, the other major factor is that banking itself has been undergoing significant change as a result of severe pressures and constraints, both internal and external. Some of the key global trends and issues affecting energy financing in today's world are considered here. (author)

  15. Energy financing in today's world - a banker's viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Mackrell, Ian [Barclays Bank plc, London (GB)

    1991-07-01

    If the world runs on energy, the energy industry runs on finance. Supplying the industry's huge appetite for funds -on the scale and in the form required - has always posed a major challenge to the international banking community. But in some respects that challenge is greater today than it has ever been, not only because of the industry's escalating requirements but also because of the way bank's attitudes have been changing in the recent past. One reason for this is the rapidly evolving scene within the energy business in response to the harsher competitive conditions and the greater uncertainties of tomorrow. However, the other major factor is that banking itself has been undergoing significant change as a result of severe pressures and constraints, both internal and external. Some of the key global trends and issues affecting energy financing in today's world are considered here. (author).

  16. Packaging Printing Today

    Directory of Open Access Journals (Sweden)

    Stanislav Bolanča

    2015-12-01

    Full Text Available Printing packaging covers today about 50% of all the printing products. Among the printing products there are printing on labels, printing on flexible packaging, printing on folding boxes, printing on the boxes of corrugated board, printing on glass packaging, synthetic and metal ones. The mentioned packaging are printed in flexo printing technique, offset printing technique, intaglio halftone process, silk – screen printing, ink ball printing, digital printing and hybrid printing process. The possibilities of particular printing techniques for optimal production of the determined packaging were studied in the paper. The problem was viewed from the technological and economical aspect. The possible printing quality and the time necessary for the printing realization were taken as key parameters. An important segment of the production and the way of life is alocation value and it had also found its place in this paper. The events in the field of packaging printing in the whole world were analyzed. The trends of technique developments and the printing technology for packaging printing in near future were also discussed.

  17. 1999 vadose zone monitoring plan and guidance for subsequent years

    International Nuclear Information System (INIS)

    Horton, D.G.; Reidel, S.P.; Last, G.V.

    1998-08-01

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive waste in the US. The majority of the liquid waste was disposed to the soil column where much of it remains today. This document provides the rationale and general framework for vadose zone monitoring at cribs, ditches, trenches and other disposal facilities to detect new sources of contamination and track the movement of existing contamination in the vadose zone for the protection of groundwater. The document provides guidance for subsequent site-specific vadose zone monitoring plans and includes a brief description of past vadose monitoring activities (Chapter 3); the results of the Data Quality Objective process used for this plan (Chapter 4); a prioritization of liquid waste disposal sites for vadose monitoring (Chapter 5 and Appendix B); a general Monitoring and Analysis Plan (Chapter 6); a general Quality Assurance Project Plan (Appendix A), and a description of vadose monitoring activities planned for FY 1999 (Appendix C)

  18. The Impact of Enterprise Resource Planning Systems on Small and Medium Enterprises

    Science.gov (United States)

    Buleje, Miguel A.

    2014-01-01

    Enterprise resource planning (ERP) systems are considered the price of entry in today's business environment, and the number of small and medium-sized enterprises (SME) retiring legacy systems in favor of ERP systems is increasing exponentially. However, there is a lack of knowledge and awareness of ERP systems and their potential benefit and…

  19. Planning for a sustainable Oslo: the challenge of turning urban theory into practice

    OpenAIRE

    Andersen, Bengt; Skrede, Joar

    2016-01-01

    Many cities today face challenges related to urban growth. This is also the case in Oslo, currently one of the fastest growing capitals in Europe. In order to prepare for the population growth, a new municipal master plan has been prepared. In this, sustainable development is a prominent concept, and the urban district is going to be densified as part of the strategy. This paper examines some obstacles of turning planning theory into practice. There is a lack of coherence between municipal...

  20. Who's my doctor today?

    Science.gov (United States)

    Cox, Ken

    2002-01-01

    Clinical practice is not always user-friendly. Specialisation fragments patient care across different investigations and modes of management. Increasing hospital throughput, especially by day surgery, diminishes the time available for students and other health professionals in the team to interact with the patient and verify the appropriateness of the care plan. Patients are at a serious disadvantage in ensuring that their concerns are understood, and in negotiation of which management plan would optimise the outcomes they seek.

  1. Important techniques in today's biomedical science research that ...

    African Journals Online (AJOL)

    The need for best evidence has driven researchers into multidisciplinary, collaborative approaches which have become mainstay in today's biomedical science. The multidisciplinary and collaborative approaches to research in research-intensive academic medical centres in the USA and in other countries of affluence has ...

  2. I Can Hardly Wait to See What I Am Going to Do Today: Lesson Planning Perspectives of Experienced Band Teachers

    Science.gov (United States)

    Shaw, Ryan D.

    2017-01-01

    The purpose of this study was to investigate the lesson planning practices of three experienced band teachers at the high school level. For the purposes of this study, experienced teachers were those with 25 or more years of teaching experience. Research questions were: (a) how do experienced high school band teachers plan for teaching, and (b)…

  3. SU-E-T-151: Breathing Synchronized Delivery (BSD) Planning for RapicArc Treatment

    International Nuclear Information System (INIS)

    Lu, W; Chen, M; Jiang, S

    2015-01-01

    Purpose: To propose a workflow for breathing synchronized delivery (BSD) planning for RapicArc treatment. Methods: The workflow includes three stages: screening/simulation, planning, and delivery. In the screening/simulation stage, a 4D CT with the corresponding breathing pattern is acquired for each of the selected patients, who are able to follow their own breathing pattern. In the planning stage, one breathing phase is chosen as the reference, and contours are delineated on the reference image. Deformation maps to other phases are performed along with contour propagation. Based on the control points of the initial 3D plan for the reference phase and the respiration trace, the correlation with respiration phases, the leaf sequence and gantry angles is determined. The beamlet matrices are calculated with the corresponding breathing phase and deformed to the reference phase. Using the 4D dose evaluation tool and the original 3D plan DVHs criteria, the leaf sequence is further optimized to meet the planning objectives and the machine constraints. In the delivery stage, the patients are instructed to follow the programmed breathing patterns of their own, and all other parts are the same as the conventional Rapid-Arc delivery. Results: Our plan analysis is based on comparison of the 3D plan with a static target (SD), 3D plan with motion delivery (MD), and the BSD plan. Cyclic motion of range 0 cm to 3 cm was simulated for phantoms and lung CT. The gain of the BSD plan over MD is significant and concordant for both simulation and lung 4DCT, indicating the benefits of 4D planning. Conclusion: Our study shows that the BSD plan can approach the SD plan quality. However, such BSD scheme relies on the patient being able to follow the same breathing curve that is used in the planning stage during radiation delivery. Funded by Varian Medical Systems

  4. Normal tissue sparing in a phase II trial on daily adaptive plan selection in radiotherapy for urinary bladder cancer.

    Science.gov (United States)

    Vestergaard, Anne; Muren, Ludvig P; Lindberg, Henriette; Jakobsen, Kirsten L; Petersen, Jørgen B B; Elstrøm, Ulrik V; Agerbæk, Mads; Høyer, Morten

    2014-08-01

    Background: Patients with urinary bladder cancer often display large changes in the shape and size of their bladder target during a course of radiotherapy (RT), making adaptive RT (ART) appealing for this tumour site. We are conducting a clinical phase II trial of daily plan selection-based ART for bladder cancer and here report dose-volume data from the first 20 patients treated in the trial. All patients received 60 Gy in 30 fractions to the bladder; in 13 of the patients the pelvic lymph nodes were simultaneously treated to 48 Gy. Daily patient set-up was by use of cone beam computed tomography (CBCT) guidance. The first 5 fractions were delivered with large, population-based (non-adaptive) margins. The bladder contours from the CBCTs acquired in the first 4 fractions were used to create a patient-specific library of three plans, corresponding to a small, medium and large size bladder. From fraction 6, daily online plan selection was performed, where the smallest plan covering the bladder was selected prior to each treatment delivery. A total of 600 treatment fractions in the 20 patients were evaluated. Small, medium and large size plans were used almost equally often, with an average of 10, 9 and 11 fractions, respectively. The median volume ratio of the course-averaged PTV (PTV-ART) relative to the non-adaptive PTV was 0.70 (range: 0.46-0.89). A linear regression analysis showed a 183 cm(3) (CI 143-223 cm(3)) reduction in PTV-ART compared to the non-adaptive PTV (R(2) = 0.94). Daily adaptive plan selection in RT of bladder cancer results in a considerable normal tissue sparing, of a magnitude that we expect will translate into a clinically significant reduction of the treatment-related morbidity.

  5. Quality assurance in the nuclear industry

    International Nuclear Information System (INIS)

    Knoedler, D.

    1978-01-01

    Quality assurance is the sum of all activities systematically planned, practiced, and controlled with the aim to assure the quality of deliveries and performances. This assurance today covers all phases of activities, from the planning (including a determination of the required and necessary quality characteristics) to the start-up of a plant. (orig./RW) [de

  6. Technical report writing today

    CERN Document Server

    Riordan, Daniel G

    2014-01-01

    "Technical Report Writing Today" provides thorough coverage of technical writing basics, techniques, and applications. Through a practical focus with varied examples and exercises, students internalize the skills necessary to produce clear and effective documents and reports. Project worksheets help students organize their thoughts and prepare for assignments, and focus boxes highlight key information and recent developments in technical communication. Extensive individual and collaborative exercises expose students to different kinds of technical writing problems and solutions. Annotated student examples - more than 100 in all - illustrate different writing styles and approaches to problems. Numerous short and long examples throughout the text demonstrate solutions for handling writing assignments in current career situations. The four-color artwork in the chapter on creating visuals keeps pace with contemporary workplace capabilities. The Tenth Edition offers the latest information on using electronic resum...

  7. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  8. Research and Science Today Supplement No. 3/2015

    Directory of Open Access Journals (Sweden)

    Adriana BUTCOVAN

    2015-07-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  9. Research and Science Today No. 2(4/2012

    Directory of Open Access Journals (Sweden)

    VĂIDEAN Amelia-Liana

    2012-11-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  10. Research and Science Today Supplement No. 1/2014

    Directory of Open Access Journals (Sweden)

    Elena-Steluţa DINU

    2014-07-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  11. Research and Science Today Supplement No. 2/2015

    Directory of Open Access Journals (Sweden)

    Tudor Cosmin CIOCAN

    2015-04-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  12. Research and Science Today Supplement No. 1/2016

    Directory of Open Access Journals (Sweden)

    Ana-Maria ADĂSCĂLIȚEI

    2016-08-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  13. Research and Science Today No. 2(2/2011

    Directory of Open Access Journals (Sweden)

    Adriana Rodica MUREŞAN

    2011-12-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  14. Research and Science Today Supplement No. 1/2015

    Directory of Open Access Journals (Sweden)

    Adrian Todor

    2015-01-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  15. Research and Science Today No. 1(1/2011

    Directory of Open Access Journals (Sweden)

    Alexandra DRĂGHICI

    2011-09-01

    Full Text Available RESEARCH AND SCIENCE TODAY is a biannual science journal established in 2011. The journal is an informational platform that publishes assessment articles and the results of various scientific research carried out by academics. We provide the authors with the opportunity to create and/or perfect their science writing skills. Thus, each issue of the journal (two per year and at least two supplements will contain professional articles from any academic field, authored by domestic and international academics. The goal of this journal is to pass on relevant information to undergraduate, graduate, and post-graduate students as well as to fellow academics and researchers; the topics covered are unlimited, considering its multi-disciplinary profile. Regarding the national and international visibility of Research and Science Today, it is indexed in over 30 international databases (IDB and is present in over 200 online libraries and catalogues; therefore, anybody can easily consult the articles featured in each issue by accessing the databases or simply the website.

  16. Phased Restoration Plan for Degraded Land in North Korea by the Clustered Distribution Pattern of Suitable Afforestation Plants

    Science.gov (United States)

    Lee, S. G.; Lee, W. K.; Choi, H. A.; Yoo, H.; Song, C.; Son, Y.; Cha, S.; Bae, S. W.

    2017-12-01

    Degraded forest of North Korea (DPRK; The Democratic People's Republic of Koprea) is not only confined itself, it could cause serious problem in Korean Peninsula. The importance of restoration for degraded land has increased to improve an healthy ecosystem and solve a shortage of food in North Korea lately. On the other hand, although effort of North Korea government, degraded problem have consistently got worse. There are two main reasons it does not show effectively. The most critical one is absence of technique and information to restore, they concentrate urgent problem which is related to a poor food supply. The other problem is that they demand an efficiency plan in a short period. In these aspect, this study aims selecting suitable tree by spatial characteristics and establishing phased restoration plan to support policy decision about a degraded land in North Korea. The suitable tree for restoration is taken from references which involve natural plant distribution of North and South Korea (ROK; Republic of Korea). Optimal environmental predicted map is deducted from accumulated data of plant physiology whose endemic environmental optimal range individually. It is integrated a map by order of priorities that first is suitable tree species according to the region, and second is clustering distribution rate in a same species. The two types of priority is applied to weighting method. The research result shows that 23 afforestation species fit to restore, and lager distributed plants agree with the major species in Korean Peninsula. The integrated map considers weight of priorities, and it appears that Picea jezoensis is matched the widest. The integrated map shows a view of suitable restoration according to the space, but this is finespun to utilize in a policy. Therefore It provides 3 step plan to support policy decision by Block Statistics, as 12.5km (long-term general plan), 5km (medium-term detailed plan), 1km (short-term implementation plan).

  17. Phase diagram of ammonium nitrate

    Energy Technology Data Exchange (ETDEWEB)

    Dunuwille, Mihindra; Yoo, Choong-Shik, E-mail: csyoo@wsu.edu [Department of Chemistry and Institute for Shock Physics, Washington State University, Pullman, Washington 99164 (United States)

    2013-12-07

    Ammonium Nitrate (AN) is a fertilizer, yet becomes an explosive upon a small addition of chemical impurities. The origin of enhanced chemical sensitivity in impure AN (or AN mixtures) is not well understood, posing significant safety issues in using AN even today. To remedy the situation, we have carried out an extensive study to investigate the phase stability of AN and its mixtures with hexane (ANFO–AN mixed with fuel oil) and Aluminum (Ammonal) at high pressures and temperatures, using diamond anvil cells (DAC) and micro-Raman spectroscopy. The results indicate that pure AN decomposes to N{sub 2}, N{sub 2}O, and H{sub 2}O at the onset of the melt, whereas the mixtures, ANFO and Ammonal, decompose at substantially lower temperatures. The present results also confirm the recently proposed phase IV-IV{sup ′} transition above 17 GPa and provide new constraints for the melting and phase diagram of AN to 40 GPa and 400°C.

  18. Phase diagram of ammonium nitrate

    International Nuclear Information System (INIS)

    Dunuwille, Mihindra; Yoo, Choong-Shik

    2013-01-01

    Ammonium Nitrate (AN) is a fertilizer, yet becomes an explosive upon a small addition of chemical impurities. The origin of enhanced chemical sensitivity in impure AN (or AN mixtures) is not well understood, posing significant safety issues in using AN even today. To remedy the situation, we have carried out an extensive study to investigate the phase stability of AN and its mixtures with hexane (ANFO–AN mixed with fuel oil) and Aluminum (Ammonal) at high pressures and temperatures, using diamond anvil cells (DAC) and micro-Raman spectroscopy. The results indicate that pure AN decomposes to N 2 , N 2 O, and H 2 O at the onset of the melt, whereas the mixtures, ANFO and Ammonal, decompose at substantially lower temperatures. The present results also confirm the recently proposed phase IV-IV ′ transition above 17 GPa and provide new constraints for the melting and phase diagram of AN to 40 GPa and 400°C

  19. CERN openlab enters fifth phase

    CERN Multimedia

    Andrew Purcell

    2015-01-01

    CERN openlab is a unique public-private partnership between CERN and leading ICT companies. At the start of this year, openlab officially entered its fifth phase, which will run until the end of 2017. For the first time in its history, it has extended beyond the CERN community to include other major European and international research laboratories.   Founded in 2001 to develop the innovative ICT systems needed to cope with the unprecedented computing challenges of the LHC, CERN openlab unites science and industry at the cutting edge of research and innovation. In a white paper published last year, CERN openlab set out the main ICT challenges it will tackle during its fifth phase, namely data acquisition, computing platforms, data storage architectures, computer management and provisioning, networks and connectivity, and data analytics. As it enters its fifth phase, CERN openlab is expanding to include other research laboratories. "Today, research centres in other disciplines are also st...

  20. Study on environmental friendly national park management plan: concentrated on the support plan for national park residents

    Energy Technology Data Exchange (ETDEWEB)

    Park, Yong Ha; Byun, Byoung Seol; Chung, Hoe Seong; Kim, Mi Sook; Kim, Jeong Won; Joo, Yong Joon [Korea Environment Institute, Seoul (Korea)

    1999-12-01

    National parks in Korea have been selected for preserving beautiful sceneries of nature or diversity of organisms. Today as the increase of population and industrialization has caused the increase of natural resource demand, it is difficult to preserve all ecosystems equally. Therefore the national park system has established to prevent the damage to an ecosystem or to preserve a region that can be damaged by selecting a valuable area. The objective of this study is to recommend an efficient support plan for national park residents, to induce their activities to be environmental friendly and to preserve an ecosystem in a national park. To achieve this, the similar systems, laws and cases in the advanced countries have compared and reviewed and a support plan for residents appropriate for Korean situation has discussed. 41 refs., 4 figs., 33 tabs.

  1. Family planning costs and benefits.

    Science.gov (United States)

    1989-01-01

    Government sponsored family planning programs have had major success in declining birth rates in Barbados, China, Cuba, Hong Kong, Indonesia, Korea, Mexico, Singapore, Sri Lanka, Taiwan, and Thailand. Non- government programs have had similar success in Brazil and Colombia. These programs have been estimated as preventing over 100 million births in China and 80 million in India. Research indicates that family planning programs can produce a 30-50% drop in fertility. Family planning information and some contraceptives can be best distributed through community organizations. Research also indicates male opposition has been a major factor in wider acceptance of family planning. Surveys indicate that 50% of the woman who want no additional children are not using any birth control. Many governments do not have the resource and money to implement programs. In the developing countries if those who were able to prevent the unwanted births had birth control, the population increases in those countries would have been 1.3% versus 2.2%. In earlier family planning programs foreign assistance paid over 80% of the cost, and national governments 20%; today this is reversed. The World Bank estimates that for major improvements in population growth and women's health, $7 billion will be needed yearly by the year 2000. The countries that have had the similar goals in development of human resources, social services, health, and education. They have attended to the status of women, female employment, and maternal and child health. Estimates are that 1.3 billion couples and individuals will need family planning services by the year 2000, and this will be a formidable task. This key elements of successful family planning programs are community participation, decentralization, and training.

  2. Producing a scale-invariant spectrum of perturbations in a Hagedorn phase of string cosmology.

    Science.gov (United States)

    Nayeri, Ali; Brandenberger, Robert H; Vafa, Cumrun

    2006-07-14

    We study the generation of cosmological perturbations during the Hagedorn phase of string gas cosmology. Using tools of string thermodynamics we provide indications that it may be possible to obtain a nearly scale-invariant spectrum of cosmological fluctuations on scales which are of cosmological interest today. In our cosmological scenario, the early Hagedorn phase of string gas cosmology goes over smoothly into the radiation-dominated phase of standard cosmology, without having a period of cosmological inflation.

  3. Climate change and landscape evolution in Provence-Alpes-Cote d'Azur. Volume 1 - Phase 1: identification of large landscape settings; Volume 2 - Phase 2: Hypotheses for climate change in the Provence-Alpes-Cote d'Azur region; Phase 3: Predictable effects of climate change on emblematic landscapes and action plan (technical sheets)

    International Nuclear Information System (INIS)

    2015-08-01

    The main objective of this study is to give an insight on possible effects climate change may have on landscapes of the Provence-Alpes-Cote d'Azur region on the medium and long term according to current hypotheses regarding global warming for Mediterranean regions. A first phase aimed at identifying the main landscape settings of the region. This comprised a definition of the notion of landscape, a discussion of landscape definitions with respect to a regional scale, a framework for the definition of the main landscape settings, an identification of these landscape settings and their characterisation according to a set of criteria and parameters. The second phase aimed at giving an overview of hypotheses regarding climate change. The authors discuss various issues and knowledge about the world climate, available climate models and their uncertainties, and climatic predictions for the region. The third phase aimed at assessing predictable effects of climate change on emblematic landscapes and at defining actions plans. The different components of these action plans are then discussed for the identified landscapes for which the landscape context and challenges are described, and potential actors are indicated. These different phases are first presented, and more detailed reports are provided for each of them, notably with detailed reports and sheets for each landscape setting

  4. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  5. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  6. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    Science.gov (United States)

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  7. Three-phase Resonant DC-link Converter

    OpenAIRE

    Munk-Nielsen, Stig

    1997-01-01

    The purpose of the project is to develop a three-phase resonant converter suitable for standard speed drives. The motivation for working with resonant converters is found in the problem of the standard converter type used today. In standard converter type Pulse Width Modulated-Voltage Source Inverter, PWM-VSI, the switches are subject to high current and voltage stress during switching, which causes losses. The fast switching of modern switches reduces switching losses. Unfortunately this pro...

  8. SAD phasing: History, current impact and future opportunities.

    Science.gov (United States)

    Rose, John P; Wang, Bi-Cheng

    2016-07-15

    Single wavelength anomalous diffraction (SAD) can trace its beginnings to the early 1950s. Researchers at the time recognized that SAD offers some unique features that might be advantageous for crystallographic phasing, despite the fact that at that time recording accurate SAD data was problematic. In this review we will follow the trail from those early days, highlighting key advances in the field and interpreting them in terms on how they stimulated continued phasing development that produced the theoretical foundation for the routine macromolecular structure determination by SAD today. The technological advances over the past three decades in both hardware and software, which played a significant role in making SAD phasing a 'first choice method', will also be described. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Environmental planning and management of urban natural landscapes

    Directory of Open Access Journals (Sweden)

    A.R. Sadeghi

    2016-07-01

    Full Text Available Advantages of urbanization such as access to clean water, health, and overall easier life in cities, as well as the disadvantages or its negative effects on environment cannot be ignored. Today, there are numerous environmental problems due to the reduction in ecologically valuable places within urban areas. Bringing nature to the cities appears to be essential to enhance urban environment and to reduce environmental problems in urban communities. In fact, issues resulting from the idea of "sustainability" as a policy-making goal require an integrated environmental policy-making approach. The innovations of new environmental policy-making require policy-making mechanisms that can deal with interdependent characteristics of environmental problems. To this end, new structures have emerged known as Environmental Planning and Management and Strategic Environmental planning and management. This analytical – descriptive article aims to re-examine the origins and concepts related to environmental planning using a field and desk study. With the introduction of urban natural landscape, Environmental planning considers such spaces within the city. In this regard, Khoshk River, Shiraz, Iran, as an urban natural landscape, was analyzed. Environmental planning-based polices were proposed to improve quality of the place under discussion.

  10. The people side of MRP (materiel requirements planning).

    Science.gov (United States)

    Lunn, T

    1994-05-01

    A montage of ideas and concepts have been successfully used to train and motivate people to use MRP II systems more effectively. This is important today because many companies are striving to achieve World Class Manufacturing status. Closed loop Materiel Requirements Planning (MRP) systems are an integral part of the process of continuous improvement. Successfully using a formal management planning system, such as MRP II, is a fundamental stepping stone on the path toward World Class Excellence. Included in this article are techniques that companies use to reduce lead time, simplify bills of materiel, and improve schedule adherence. These and other steps all depend on the people who use the system. The focus will be on how companies use the MRP tool more effectively.

  11. Some Distinctive Features of Jesuit Higher Education Today

    Science.gov (United States)

    Currie, Charles L.

    2010-01-01

    The nation's Catholic colleges and universities are recommitting themselves to making their founding visions come alive in increasingly effective and innovative ways. This article describes the Jesuit tradition of higher education, discussing its origins and how it is reflected in the reality and practice of Jesuit higher education today. This is…

  12. Entrepreneurialism for Canadian Principals: Yesterday, Today, and Tomorrow

    Science.gov (United States)

    Scott, Shelleyann; Webber, Charles F.

    2013-01-01

    This article explores the various elements of Canadian educational entrepreneurialism as manifested yesterday, today, and tomorrow and in relation to the social and political influences of the time. This discussion is informed by the findings of the International Study of the Preparation of Principals (ISPP) and represents an expansion of the…

  13. Phase II test plan for the evaluation of the performance of container filling systems

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples and will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolidwater and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999

  14. Knee arthrography today

    International Nuclear Information System (INIS)

    Otto, H.; Kallenberger, R.

    1987-01-01

    The role of knee arthrography today is demonstrated and technical problems are discussed. Among a lot of variants the position of the patient and the choice of contrast media play a great part concerning the result of the examination. Mild complications occur in 0.25% of the examinations, severe and live threatening complications are extremely rare. Diagnosis of meniscal lesions is most important for knee arthrography; arthroscopy and arthrography are complementary examinations and not mutually exclusive, they achieve combined an accuracy of 97-98%. In the same way arthrography is able to evaluate the condropathy of the femoro-tibial joint, whereas accuracy of arthroscopy in the diagnosis of patellar chondropathy is much higher. There is a great reliability of arthrography regarding the evaluation of lesions of the capsule, but accuracy in lesions of the cruciate ligaments is low. Arthrography is very suitable for evaluation of Baker-cysts, since indications for almost occuring internal derangement of the knee are even available. Knee arthrography is a complex and safe procedure with very less discomfort for the patient; it has a central position in the evaluation of lesions of the knee. (orig.) [de

  15. Framework for reports on urban energy planning in 6 case cities

    DEFF Research Database (Denmark)

    Fertner, Christian; Groth, Niels Boje; Große, Juliane

    a general model for energy efficiency and sustainable city planning. By connecting scientific excellence and innovative enterprises in the energy sector with ambitious and well-organized cities, the project aims to reduce energy use in Europe in the near future and will therefore be an important tool...... on the case study reports (D4.2). The wider target group are other PLEEC partners who are interested in WP4’s work as well as other professionals who would like to get inspiration how to conduct an analysis of energy issues in relation to spatial planning and urban form in medium-sized cities. Five main...... chapters are suggested to follow in all case study reports: • Overview of city (geography, socio-economic, history, …) • Historical urban development and spatial planning development • Evolution of national and local energy planning • Management of urban planning and energy today • Pilot projects / good...

  16. WE-B-304-03: Biological Treatment Planning

    International Nuclear Information System (INIS)

    Orton, C.

    2015-01-01

    The ultimate goal of radiotherapy treatment planning is to find a treatment that will yield a high tumor control probability (TCP) with an acceptable normal tissue complication probability (NTCP). Yet most treatment planning today is not based upon optimization of TCPs and NTCPs, but rather upon meeting physical dose and volume constraints defined by the planner. It has been suggested that treatment planning evaluation and optimization would be more effective if they were biologically and not dose/volume based, and this is the claim debated in this month’s Point/Counterpoint. After a brief overview of biologically and DVH based treatment planning by the Moderator Colin Orton, Joseph Deasy (for biological planning) and Charles Mayo (against biological planning) will begin the debate. Some of the arguments in support of biological planning include: this will result in more effective dose distributions for many patients DVH-based measures of plan quality are known to have little predictive value there is little evidence that either D95 or D98 of the PTV is a good predictor of tumor control sufficient validated outcome prediction models are now becoming available and should be used to drive planning and optimization Some of the arguments against biological planning include: several decades of experience with DVH-based planning should not be discarded we do not know enough about the reliability and errors associated with biological models the radiotherapy community in general has little direct experience with side by side comparisons of DVH vs biological metrics and outcomes it is unlikely that a clinician would accept extremely cold regions in a CTV or hot regions in a PTV, despite having acceptable TCP values Learning Objectives: To understand dose/volume based treatment planning and its potential limitations To understand biological metrics such as EUD, TCP, and NTCP To understand biologically based treatment planning and its potential limitations

  17. Global aromatics supply. Today and tomorrow

    Energy Technology Data Exchange (ETDEWEB)

    Bender, M. [BASF SE, Ludwigshafen (Germany)

    2013-11-01

    Aromatics are the essential building blocks for some of the largest petrochemical products in today's use. To the vast majority they are consumed to produce intermediates for polymer products and, hence, contribute to our modern lifestyle. Their growth rates are expected to be in line with GDP growth in future. This contrasts the significantly lower growth rates of the primary sources for aromatics - fuel processing and steam cracking of naphtha fractions. A supply gap can be expected to open up in future for which creative solutions will be required. (orig.)

  18. Collaborative Strategic Planning in Higher Education

    Science.gov (United States)

    Sanaghan, Patrick

    2009-01-01

    This book outlines a simple, five-phase collaborative approach to strategic planning that has worked effectively on many campuses. Specifically, Collaborative Strategic Planning (CSP) refers to the disciplined and thoughtful process of meaningfully engaging relevant stakeholders in creating a shared future vision and goals for their institution.…

  19. Immigrants as Refugees of the Global Economy: Learning to Teach (about) Today's Migrants

    Science.gov (United States)

    Reed, Judith

    2015-01-01

    The phenomenon of migration as it is known today must be understood in the larger context of the globalized economy and the "race to the bottom" that characterizes the multinational corporate relationship with the global South. A deeper understanding of the ways in which migration today is rooted in the machinations of the globalized…

  20. Aging of snubbers in nuclear service: Phase I study results and Phase II plans

    International Nuclear Information System (INIS)

    Goodman, R.L.; Bush, S.H.; Page, R.E.

    1988-01-01

    Two major research areas were investigated in the Phase I snubber aging studies. The first area involved a preliminary evaluation of the effects of various aging mechanisms on snubber operation; failure modes of mechanisms were identified and their contributions to aging degradation were assessed relative to other failure modes. The second area involved estimating the efficacy of existing tests and examinations that are intended to determine the effects of aging and degradation. Available data on snubber behavior and operating experience were reviewed, using licensee event reports and other historical data for the 10-year period from 1973 through 1983. Value-impact was considered in terms of (1) exposure of workers to radioactive environments for examination/testing and (2) the cost for expansion of the snubber testing program due to failed snubbers. Results from the Phase I studies identified the need to modify or improve examination and testing procedures to enhance snubber reliability. Based on the results of the Phase I snubber studies, the seals and fluids were identified as the two principal elements affected by aging degradation in hydraulic snubbers. Phase II work, which was initiated in FY 1987, will develop cooperative activities between PNL and operating utilities through the Snubber Utility Group (SNUG), who will work to establish a strong data and experience base for both hydraulic and mechanical snubbers based on actual operating and maintenance history at nuclear power plants. Application guidelines for snubbers will be recommended based on the study results

  1. Maintaining professionalism in today's business environment: ethical challenges for the pain medicine specialist.

    Science.gov (United States)

    Lebovits, Allen

    2012-09-01

    There are many external influences in today's market force that impair the relationship between the pain medicine specialist and the patient, and ultimately prevent optimal quality of care. This article explores the ethical challenges facing the pain medicine specialist in today's increasingly "business" environment and will offer solutions for maintaining the professionalism of pain medicine. Four commonly encountered bioethical principles in the practice of pain medicine are reviewed: beneficence, nonmaleficence, justice, and autonomy. The following ethical challenges of the pain medicine specialist are reviewed: practicing outside ones specialty area, practice characteristics, the consultant role, the economic lure of aggressive intervention, not evaluating for and treating comorbid psychopathology, reimbursement pressures, workers' compensation, and use of unproven methods. Solutions offered include collegial associations, social responsibility, legislative initiatives, pain education, interdisciplinary evaluation and treatment, improved relationships with third-party payers, reduced racial disparities, and ethics education. Ethics is the "roadmap" that enables the pain medicine specialist to navigate the increasingly murky waters of practicing pain management today by maintaining the professionalism necessary to combat today's "business" pressures. Wiley Periodicals, Inc.

  2. Generation Expansion Planning Considering Integrating Large-scale Wind Generation

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Østergaard, Jacob

    2013-01-01

    necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. A bi-level generation expansion planning approach considering large-scale wind generation was proposed in this paper. The first phase is investment decision, while the second phase is production...... optimization decision. A multi-objective PSO (MOPSO) algorithm was introduced to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of the proposed bi-level planning approach and the MOPSO...

  3. Russia Today : Ruslands internationale spreekbuis voor 'soft power'?

    NARCIS (Netherlands)

    Kraft van Ermel, Nicolaas

    2014-01-01

    The tense current relations between Russia, Ukraine and the West are characterised by a true media war. This media war is fought in the old as well as in the new media, for example on television. One of the players in this game is the Russian English language television station Russia Today (since

  4. Organizing a Ground Crew for Today's Helicopter Parents

    Science.gov (United States)

    Coburn, Karen Levin

    2006-01-01

    The relationship between college students and their parents is far closer than it was when most of today's educators were in school. Tapping into the upside and managing the potential drawbacks of highly involved parents is taking on great importance on an increasing number of campuses. Whether people call them "helicopter parents" or…

  5. Quality plan and configuration management in complex systems

    International Nuclear Information System (INIS)

    Gonzalez Junto, J.; Merchan Teyssiere

    1993-01-01

    Since the Second World War, the philosophy behind the quality systems of industries and service companies has evolved to embrace the whole life cycle of the product, system or service. In this evolution process, quality has become a strategic factor in the survival of entreprises. The first steps in trying to establish quality systems were taken for the armed forces, followed by space, aeronautical and nuclear projects, whose products were more and more complex and sophisticated. These systems were established by means of quality plans or programmes, and their basic objective was to guarantee a high safety level for the user and/or the general population. In later years, the main concern was to reach a determined quality level not only in one phase of the product life, but in the complete life cycle of the final product. Today a new goal is established and pursued: better quality of the product, service or system life cycle at a lower cost. Methods of improving the quality of systems and processes are the subject of numerous initiatives and studies, to better availability and maintainability of complex equipment or installations, with an extended useful life and greater requirements. Experience in the performance of complex projects shows that a higher quality may be obtained through designing a comprehensive quality plan which pays special attention to information management and modifications of the original design. Obtaining a high reliability level for an installation (equipment, systems, etc), increasing its availability and rationalizing its maintenance may be little less than fanciful without a deep knowledge of the installation, of its activities and its current status in day-to-day operation, which shows the importance of truthful information available to operators and corresponding exactly to their needs. In this frame of mind, a quality plan comprising a configuration management system of information and documents constitutes the basic support tool for

  6. Strategic Planning And Its Relationship With Business Performance Among Small And Medium Enterprises In South Africa

    OpenAIRE

    Maxwell Sandada; David Pooe; Manilall Dhurup

    2014-01-01

    Strategic planning is a business tool that small and medium businesses need in todays dynamic and highly competitive business environment. It has a potential to cushion these enterprises from such unpredictable harsh business conditions. The purpose of this paper was to establish the relationship between strategic planning practices and business performance among SMEs in the Gauteng province of South Africa. Data were analysed from 200 useable questionnaires that were distributed to SME owner...

  7. The Employment Equation: Why Our Young People Need More Maths for Today's Jobs

    Science.gov (United States)

    Hodgen, Jeremy; Marks, Rachel

    2013-01-01

    This report reviews over 50 research studies to consider the level and type of mathematical skills needed by employers in today's economy. It considers five key questions: (1) What mathematics (level and content) is required in the workplace today?; (2) How and why have the mathematical needs of the workplace changed over time?; (3) In what ways…

  8. Inverse planning IMRT

    International Nuclear Information System (INIS)

    Rosenwald, J.-C.

    2008-01-01

    The lecture addressed the following topics: Optimizing radiotherapy dose distribution; IMRT contributes to optimization of energy deposition; Inverse vs direct planning; Main steps of IMRT; Background of inverse planning; General principle of inverse planning; The 3 main components of IMRT inverse planning; The simplest cost function (deviation from prescribed dose); The driving variable : the beamlet intensity; Minimizing a 'cost function' (or 'objective function') - the walker (or skier) analogy; Application to IMRT optimization (the gradient method); The gradient method - discussion; The simulated annealing method; The optimization criteria - discussion; Hard and soft constraints; Dose volume constraints; Typical user interface for definition of optimization criteria; Biological constraints (Equivalent Uniform Dose); The result of the optimization process; Semi-automatic solutions for IMRT; Generalisation of the optimization problem; Driving and driven variables used in RT optimization; Towards multi-criteria optimization; and Conclusions for the optimization phase. (P.A.)

  9. State of Oregon 4th biennial energy plan

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    State law directs the Oregon Department of Energy (ODOE) to prepare an energy plan every two years. This is the Fourth Biennial Energy Plan. The Plan is a policy blueprint for how to best meet Oregon's future energy needs. It identifies the key energy issues facing the state and sets forth policies and actions to achieve our energy goals of reliable, least-cost, and environmentally safe supply. This book presents: Oregon's demand and supply picture today. The progress Oregon has made toward energy efficiency. Oregon's energy demand and supply outlook for the next 20 years. Estimates of cost-effective conservation and other resources that could contribute to the state's energy supply. The major energy-related health, safety, and environmental issues facing the state. A strategy to reduce greenhouse gas emissions 20 percent from 1988 levels by 2005. A two-year Action Plant that spells out ODOE's recommended actions for achieving Oregon's energy goals

  10. Production planning and control for semiconductor wafer fabrication facilities modeling, analysis, and systems

    CERN Document Server

    Mönch, Lars; Mason, Scott J

    2012-01-01

    Over the last fifty-plus years, the increased complexity and speed of integrated circuits have radically changed our world. Today, semiconductor manufacturing is perhaps the most important segment of the global manufacturing sector. As the semiconductor industry has become more competitive, improving planning and control has become a key factor for business success. This book is devoted to production planning and control problems in semiconductor wafer fabrication facilities. It is the first book that takes a comprehensive look at the role of modeling, analysis, and related information systems

  11. An integrated approach to hospital strategic planning, quality assurance, and continuous quality improvement.

    Science.gov (United States)

    Day, G; Gardner, S; Herba, C

    1995-01-01

    Like many other healthcare organizations today, the authors' facility, a 306-bed acute care community hospital in Michigan, strives to visualize and make a transition from traditional quality assurance to continuous quality improvement. The Juran Trilogy provided the insight that strategic planning, measurement, and continuous improvement must exist side by side. At the authors' facility, this realization resulted in the hospital quality plan, which treats each of these components as part of the foundation for quality. The authors explain this model and the reporting and communication mechanisms that support it.

  12. IN TODAY'S INFORMATION AGE ORGANISATIONS EXECUTIVE ASSISTANT PROFESSION

    Directory of Open Access Journals (Sweden)

    Bekir DEĞİRMENCİ

    2015-07-01

    Full Text Available It's as old as human history in the Executive Office and of the concept has caused the unborn. From the industrial revolution, they perform the organizational activities of all employees in the area are the name of the Office. Businesses are not just places that made production. Businesses also allows the production of all kinds of people have seen the need, the important strategic decisions, increase the quali ty of production and employees must work efficiently and effectively - conscious upon arrival places always have been offices. Marketing, management, human resources, accounting, as units have been operating in all offices within the organization. In today' s information age, information offices are produced, distributed to individuals and corporations concerned, but also has been the destruction of redundant information and important information later when needed has been used places. Today's globalization i s rapid change in knowledge and technology organizations in the management of business owners and managers will help many professions on WikiMapia. Office; Administrator, officer, Secretary, will serve the objectives of the business class ser vices help kin d of elements are needed. Businesses in maintaining vital activities, production and service provision of the activities of the Organization in ensuring an effective and efficient manner within the framework of the team spirit in the conduct of managers with the most important requirements for an Assistant Manager's position has been. Most modern - day organizations close to the administrator should be looking to key features of the Administrative Assistant; the Office of the administrator, who knows how t o keep a secret is not a characteristic of people who best represent the Bureau. When a business can stand in straight execution activities Administrative Assistant has important tasks to. Executive Assistants are indispensable ingredients of today's mode rn office.

  13. Managing the complexity and uncertainties of load, generation and markets in system development planning

    International Nuclear Information System (INIS)

    2008-01-01

    System planners face today unique challenges to accommodate the new uncertainties in markets, loads and generation and to develop system plans that balance reliability, economy and risk. The report summarizes a survey of the methods used worldwide. In addition, case examples are provided to illustrate in more detail these methods

  14. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  15. A Planning Guide for Instructional Networks, Part I.

    Science.gov (United States)

    Daly, Kevin F.

    1994-01-01

    Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)

  16. 3D and 4D Seismic Technics Today

    Directory of Open Access Journals (Sweden)

    Marcin Marian

    2004-09-01

    Full Text Available Years ago, exploration was done through surface observations and „divining rods“ – now, it is done by satellites, microprocessors, remote sensing, and supercomputers. In the 1970´ s, the exploration success rate was 14 percent, today, it is nearly 29 percent. Not so long ago, three – dimension (3D seismic diagnostic techniques helped recover 25-50 percent of the oil in place – now, 4D seismic helps recover up to 70 percent of the oil in place. 3D and 4D seismic and earth imaging systems also help in understanding the subsurface flow of other fluids, such as groundwater and pollutants.Seismic surveys – a technique in which sound waves are bounced off underground rock struktures to reveal possible oil and gas bearing formation – are now standard fare for the modern petroleum industry. But today’s seismic methods are best at locating „structural traps“ where faults or folds in the underground rock have created zones where oil can become trapped.

  17. The power of data: structural bioinformatics yesterday and today

    KAUST Repository

    Tramontano, Anna

    2016-01-01

    The protein structure database was established in 1971. At the time it contained seven structures, today there are more than 100,000. The improvement is not only a matter of quantity, but also of quality. Did we effectively exploit this information

  18. Planning for post disaster recovery: Lesson learnt from flood events in Kelantan Malaysia

    Science.gov (United States)

    Rani, Wan Nurul Mardiah Wan Mohd; Nifa, Faizatul Akmar Abdul; Ismail, Mohd Noorizhar; Khalid, Khairin Norhashidah

    2017-10-01

    As the frequency of disaster occurrence increases, the world cities today are getting more difficult in terms of the management of the event. One of the most discussed issues today is the management of the post-disaster recovery that involves several stages such as the planning, management of multiple stakeholders, restoration, reconstruction and delivery. It is important to note that input from related stakeholders is necessary to make the right decision during this most critical period. In the process of building back after a disaster, it is important to ensure the newly constructed infrastructures are built to be more resilient and able to withstand a certain level of disaster recurrence. Elements of disaster risk reduction should be incorporated in the planning, redesign, construction and the operation of the built environment. In Malaysia, the disaster management has been the responsibility of the Disaster Management and Relief Committee that consists of agencies at the central, state and local levels. This is to ensure that all aspects are being considered and to be more effective in managing the situation.

  19. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  20. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  1. Space Weather Action Plan Ionizing Radiation Benchmarks: Phase 1 update and plans for Phase 2

    Science.gov (United States)

    Talaat, E. R.; Kozyra, J.; Onsager, T. G.; Posner, A.; Allen, J. E., Jr.; Black, C.; Christian, E. R.; Copeland, K.; Fry, D. J.; Johnston, W. R.; Kanekal, S. G.; Mertens, C. J.; Minow, J. I.; Pierson, J.; Rutledge, R.; Semones, E.; Sibeck, D. G.; St Cyr, O. C.; Xapsos, M.

    2017-12-01

    Changes in the near-Earth radiation environment can affect satellite operations, astronauts in space, commercial space activities, and the radiation environment on aircraft at relevant latitudes or altitudes. Understanding the diverse effects of increased radiation is challenging, but producing ionizing radiation benchmarks will help address these effects. The following areas have been considered in addressing the near-Earth radiation environment: the Earth's trapped radiation belts, the galactic cosmic ray background, and solar energetic-particle events. The radiation benchmarks attempt to account for any change in the near-Earth radiation environment, which, under extreme cases, could present a significant risk to critical infrastructure operations or human health. The goal of these ionizing radiation benchmarks and associated confidence levels will define at least the radiation intensity as a function of time, particle type, and energy for an occurrence frequency of 1 in 100 years and an intensity level at the theoretical maximum for the event. In this paper, we present the benchmarks that address radiation levels at all applicable altitudes and latitudes in the near-Earth environment, the assumptions made and the associated uncertainties, and the next steps planned for updating the benchmarks.

  2. Effective Hull IMMR plan

    Energy Technology Data Exchange (ETDEWEB)

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  3. Planning protected areas network that are relevant today and under future climate change is possible: the case of Atlantic Forest endemic birds

    Directory of Open Access Journals (Sweden)

    Mariana M. Vale

    2018-05-01

    Full Text Available Background A key strategy in biodiversity conservation is the establishment of protected areas. In the future, however, the redistribution of species in response to ongoing climate change is likely to affect species’ representativeness in those areas. Here we quantify the effectiveness of planning protected areas network to represent 151 birds endemic to the Brazilian Atlantic Forest hotspot, under current and future climate change conditions for 2050. Methods We combined environmental niche modeling and systematic conservation planning using both a county and a regional level planning strategy. We recognized the conflict between biodiversity conservation and economic development, including socio-economic targets (as opposed to biological only and using planning units that are meaningful for policy-makers. Results We estimated an average contraction of 29,500 km2 in environmentally suitable areas for birds, representing 52% of currently suitable areas. Still, the most cost-effective solution represented almost all target species, requiring only ca. 10% of the Atlantic Forest counties to achieve that representativeness, independent of strategy. More than 50% of these counties were selected both in the current and future planned networks, representing >83% of the species. Discussion Our results indicate that: (i planning protected areas network currently can be useful to represent species under climate change; (ii the overlapped planning units in the best solution for both current and future conditions can be considered as “no regret” areas; (iii priority counties are spread throughout the biome, providing specific guidance wherever the possibility of creating protected area arises; and (iv decisions can occur at different administrative spheres (Federal, State or County as we found quite similar numerical solutions using either county or regional level strategies.

  4. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  5. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  6. Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2010-08-16

    former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides

  7. Filial obligations today : moral practice, perception and ethical theory

    NARCIS (Netherlands)

    Stuifbergen, M.C.

    2011-01-01

    This thesis is about the meaning of filial obligations in Dutch society today. The thesis consists of a general introduction, two quantitative sociological studies, two qualitative studies, an ethical analysis and a general discussion. In the introduction, the background for the research questions

  8. Measuring Business Process Learning with Enterprise Resource Planning Systems to Improve the Value of Education

    Science.gov (United States)

    Monk, Ellen F.; Lycett, Mark

    2016-01-01

    Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are being used in higher education as one way to teach business processes, essential knowledge for students competing in today's business environment. Past research attempting to measure…

  9. Can I solve my structure by SAD phasing? Planning an experiment, scaling data and evaluating the useful anomalous correlation and anomalous signal.

    Science.gov (United States)

    Terwilliger, Thomas C; Bunkóczi, Gábor; Hung, Li Wei; Zwart, Peter H; Smith, Janet L; Akey, David L; Adams, Paul D

    2016-03-01

    A key challenge in the SAD phasing method is solving a structure when the anomalous signal-to-noise ratio is low. Here, algorithms and tools for evaluating and optimizing the useful anomalous correlation and the anomalous signal in a SAD experiment are described. A simple theoretical framework [Terwilliger et al. (2016), Acta Cryst. D72, 346-358] is used to develop methods for planning a SAD experiment, scaling SAD data sets and estimating the useful anomalous correlation and anomalous signal in a SAD data set. The phenix.plan_sad_experiment tool uses a database of solved and unsolved SAD data sets and the expected characteristics of a SAD data set to estimate the probability that the anomalous substructure will be found in the SAD experiment and the expected map quality that would be obtained if the substructure were found. The phenix.scale_and_merge tool scales unmerged SAD data from one or more crystals using local scaling and optimizes the anomalous signal by identifying the systematic differences among data sets, and the phenix.anomalous_signal tool estimates the useful anomalous correlation and anomalous signal after collecting SAD data and estimates the probability that the data set can be solved and the likely figure of merit of phasing.

  10. Simulation For Synchronization Of A Micro-Grid With Three-Phase Systems

    OpenAIRE

    Mohammad Jafari Far

    2015-01-01

    Abstract today due to the high reliability of the micro-grids they have developed significantly. They have two states of operation the island state and connection to the main grid. Under certain circumstances the micro-grid is connected to or disconnected from the network. Synchronization of a micro-grid with the network must be done when its voltage is synchronized with the voltage in the main grid. Phase lock loops are responsible to identify the voltage phase of the micro-gird and the main...

  11. Application of virtual surgical planning with computer assisted design and manufacturing technology to cranio-maxillofacial surgery.

    Science.gov (United States)

    Zhao, Linping; Patel, Pravin K; Cohen, Mimis

    2012-07-01

    Computer aided design and manufacturing (CAD/CAM) technology today is the standard in manufacturing industry. The application of the CAD/CAM technology, together with the emerging 3D medical images based virtual surgical planning (VSP) technology, to craniomaxillofacial reconstruction has been gaining increasing attention to reconstructive surgeons. This article illustrates the components, system and clinical management of the VSP and CAD/CAM technology including: data acquisition, virtual surgical and treatment planning, individual implant design and fabrication, and outcome assessment. It focuses primarily on the technical aspects of the VSP and CAD/CAM system to improve the predictability of the planning and outcome.

  12. Large scale electronic structure calculations in the study of the condensed phase

    NARCIS (Netherlands)

    van Dam, H.J.J.; Guest, M.F.; Sherwood, P.; Thomas, J.M.H.; van Lenthe, J.H.; van Lingen, J.N.J.; Bailey, C.L.; Bush, I.J.

    2006-01-01

    We consider the role that large-scale electronic structure computations can now play in the modelling of the condensed phase. To structure our analysis, we consider four distict ways in which today's scientific targets can be re-scoped to take advantage of advances in computing resources: 1. time to

  13. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  14. Planning, Implementation and Optimization of Future space Missions using an Immersive Visualization Environement (IVE) Machine

    Science.gov (United States)

    Harris, E.

    Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars

  15. 'Action 2016': AREVA's strategic action plan

    International Nuclear Information System (INIS)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  16. 42 CFR 137.25 - Are planning and negotiation grants available?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Are planning and negotiation grants available? 137... for Participation in Self-Governance Planning Phase § 137.25 Are planning and negotiation grants... planning and negotiation grants available, an explanation of the application process for such grants, and...

  17. The uranium industry: long term planning for short term competition

    International Nuclear Information System (INIS)

    Vottero, X.

    2000-01-01

    Today, uranium producers face new challenges in terms of both production (new regulatory, environmental and social constraints) and market conditions (new sources of uranium supply, very low prices and tough competition). In such a context, long-term planning is not just a prerequisite to survive in the nuclear fuel cycle industry. In fact, it also contributes to sustaining nuclear electricity generation facing fierce competition from other energy sources in increasingly deregulated markets. (authors)

  18. Computer Literacy for Life Sciences: Helping the Digital-Era Biology Undergraduates Face Today's Research

    Science.gov (United States)

    Smolinski, Tomasz G.

    2010-01-01

    Computer literacy plays a critical role in today's life sciences research. Without the ability to use computers to efficiently manipulate and analyze large amounts of data resulting from biological experiments and simulations, many of the pressing questions in the life sciences could not be answered. Today's undergraduates, despite the ubiquity of…

  19. 78 FR 42051 - Proposed Revision of the Corporation for National and Community Service Strategic Plan; Request...

    Science.gov (United States)

    2013-07-15

    ... implementing its mission. We invite grantees, partners, future partners, and the public to submit written... and opportunity. Goal 3: Maximize the value we add to grantees, partners and participants. Goal 4... plan? What is less relevant in today's environment, allowing resources to be focused elsewhere? Dated...

  20. Critical Success Factors for the Implementation of PeopleSoft Enterprise Resource Planning in a Public Organization

    Science.gov (United States)

    Mukkamala, Hemanth K.

    2013-01-01

    Organizations of different sizes are changing their information technology (IT) strategies in order to achieve efficiency and effectiveness in today's global economy and to integrate their internal and external information by implementing PeopleSoft Enterprise Resource Planning (ERP) systems. The literature has case studies of successful and…

  1. Path Planning with a Lazy Significant Edge Algorithm (LSEA

    Directory of Open Access Journals (Sweden)

    Joseph Polden

    2013-04-01

    Full Text Available Probabilistic methods have been proven to be effective for robotic path planning in a geometrically complex environment. In this paper, we propose a novel approach, which utilizes a specialized roadmap expansion phase, to improve lazy probabilistic path planning. This expansion phase analyses roadmap connectivity information to bias sampling towards objects in the workspace that have not yet been navigated by the robot. A new method to reduce the number of samples required to navigate narrow passages is also proposed and tested. Experimental results show that the new algorithm is more efficient than the traditional path planning methodologies. It was able to generate solutions for a variety of path planning problems faster, using fewer samples to arrive at a valid solution.

  2. Quality improvement initiatives: the missed opportunity for health plans.

    Science.gov (United States)

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  3. Nuclear power plant Severe Accident Research Plan

    International Nuclear Information System (INIS)

    Larkins, J.T.; Cunningham, M.A.

    1983-01-01

    The Severe Accident Research Plan (SARP) will provide technical information necessary to support regulatory decisions in the severe accident area for existing or planned nuclear power plants, and covers research for the time period of January 1982 through January 1986. SARP will develop generic bases to determine how safe the plants are and where and how their level of safety ought to be improved. The analysis to address these issues will be performed using improved probabilistic risk assessment methodology, as benchmarked to more exact data and analysis. There are thirteen program elements in the plan and the work is phased in two parts, with the first phase being completed in early 1984, at which time an assessment will be made whether or not any major changes will be recommended to the Commission for operating plants to handle severe accidents. Additionally at this time, all of the thirteen program elements in Chapter 5 will be reviewed and assessed in terms of how much additional work is necessary and where major impacts in probabilistic risk assessment might be achieved. Confirmatory research will be carried out in phase II to provide additional assurance on the appropriateness of phase I decisions. Most of this work will be concluded by early 1986

  4. Telecommunications Network Plan

    International Nuclear Information System (INIS)

    1989-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affected by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM's information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program's Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs

  5. Today's threat and tomorrow's reaction

    International Nuclear Information System (INIS)

    Moore, L.R.

    2002-01-01

    Full text: The events of September 11 have only confirmed our past nightmares and warnings to industries, agencies, and governments. The threat of even more significant catastrophic attacks, using nuclear materials, was just as real ten years ago, as it is today. In many cases, our vulnerability remains the same as years ago. There is a dire need for all organizations to agree upon threats and vulnerabilities, and to implement appropriate protections, for nuclear materials or other 'means' to achieve an event of mass destruction. All appropriate organizations (industries, agencies, and governments) should be able to define, assess, and recognize international threats and vulnerabilities in the same manner. In complimentary fashion, the organizations should be able to implement safeguards against this consistent generic threat. On an international scale the same threats, and most vulnerabilities, pose high risks to all of these organizations and societies. Indeed, in today's world, the vulnerabilities of one nation may clearly pose great risk to another nation. Once threats and vulnerabilities are consistently recognized, we can begin to approach their mitigation in a more 'universal' fashion by the application of internationally recognized and accepted security measures. The path to recognition of these security measures will require agreement on many diverse issues. However, once there is general agreement, we can then proceed to the acquisition of diverse national and international resources with which to implement the security measures 'universally' to eliminate 'weak-links' in the chain of nuclear materials, on a truly international scale. I would like to discuss: developing a internationally acceptable 'generic' statement of threat, vulnerability assessment process, and security measure; proposing this international statement of threat, vulnerability assessment process, and appropriate security measures to organizations (industries, agencies, and governments

  6. "Children are from heaven" or how today children respect adults

    Directory of Open Access Journals (Sweden)

    Barbara Vogrinec

    2007-06-01

    Full Text Available The starting point of the text is a returning to the patriarchal, which is not simply the one that we are witnessing today, in the time of so-called postmodern, postpatriarchal society in its (until now last form. It is a matter of returning to rules, of which the basic premise is that adults are subjects (transcendences, freedoms, activities and children are subjects that are objects for adults (imanences, non-freedoms, pasivities, but which notwithstanding differ from the oldfashioned rules from the past. We attempted to explain this returning, following the example of rules offered by the book Children Are From Heaven – a selfhelp book, published at the end of the nineties of the 20th century, which immediately became the world's bestseller. In addition, our aim was to answer the following questions: What has happened with rules of civilization and good manners, regulating the relations between children and adults today? How have they changed and what has happened with children's or adults's relation to these rules or their performings? How has this relation changed? Considering the mentioned basic premise which implies that children respect adults, we also tried to answer the question: What has happened with the respect, or, how do children respect adults today? Disscussion is presented in the framework of lacanian psychoanalysis.

  7. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  8. The role of Einstein's general relativity theory in today's physics

    International Nuclear Information System (INIS)

    Bicak, J.

    The relationships are discussed of the general relativity theory to other fields of today's physics. Recent results are reported of studies into gravitational radiation, relativistic astrophysics, cosmology and the quantum theory. (Z.M.)

  9. Today's College Students: Going First Class on the Titanic.

    Science.gov (United States)

    Levine, Arthur

    1981-01-01

    There is a sense among today's students that they are passengers on a sinking ship, even though they are optimistic about their own futures. A new curriculum including interdisciplinary study, majors in problems rather than disciplines, career internships, and theses is proposed to counter student attitudes. (MSE)

  10. Chemistry Today and Tomorrow-The Central, Useful, and Creative ...

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 2; Issue 5. Chemistry Today and Tomorrow – The Central, Useful and Creative Science. Uday Maitra. Book Review Volume 2 ... Author Affiliations. Uday Maitra1. Department of Organic Chemistry, Indian Institute of Science, Bangalore 560 012, India.

  11. A Planning Framework for the Deployment of Innovative Information and Communication Technologies in Procurement

    Science.gov (United States)

    Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg

    The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.

  12. Using a Personal Development Plan for Different Purposes: Its Influence on Undertaking Learning Activities and Job Performance

    Science.gov (United States)

    Beausaert, Simon A. J.; Segers, Mien S. R.; Gijselaers, Wim H.

    2011-01-01

    Today, organizations are increasingly implementing assessment tools such as Personal Development Plans. Although the true power of the tool lies in supporting the employee's continuing professional development, organizations implement the tool for various different purposes, professional development purposes on the one hand and promotion/salary…

  13. Phases of QCD

    International Nuclear Information System (INIS)

    Roessner, Simon

    2009-01-01

    Quantum Chromodynamics (QCD) is the theory of the strong interaction within the Standard Model of elementary particles. Today's research in this area dedicates substantial resources to numeric solutions of the QCD field equations and experimental programs exploring the phases of QCD. This thesis proceeds along a complementary line - that of modelling QCD, with the aim of identifying its dominant degrees of freedom. This is possible by minimally coupling effective potentials for the Polyakov loop to Nambu-Jona-Lasinio models using temporal background fields to model chiral symmetry breaking respecting colour confinement. The fermion sign problem resulting from the minimal coupling is addressed in this work establishing a novel, systematically ordered approach. The modifications to the approximative order parameter of colour confinement, the Polyakov loop, are in direct connection with the fermion sign problem. Furthermore an effective coupling of quark densities of different flavours is induced. This mechanism, most likely also present in QCD, produces finite contributions to flavour off diagonal susceptibilities. Susceptibilities are amongst the most promising physical quantities for the experimental exploration of the phase transition at high temperatures and densities. (orig.)

  14. Strategic marketing planning in library

    Directory of Open Access Journals (Sweden)

    Karmen Štular-Sotošek

    2000-01-01

    Full Text Available The article is based on the idea that every library can design instruments for creating events and managing the important resources of today's world, especially to manage the changes. This process can only be successful if libraries use adequate marketing methods. Strategic marketing planning starts with the analysis of library's mission, its objectives, goals and corporate culture. By analysing the public environment, the competitive environment and the macro environment, libraries recognise their opportunities and threats. These analyses are the foundations for library definitions: What does the library represent?, What does it aspire to? Which goals does it want to reach? What kind of marketing strategy will it use for its target market?

  15. Planning tiger recovery: Understanding intraspecific variation for effective conservation

    OpenAIRE

    Wilting, Andreas; Courtiol, Alexandre; Christiansen, Per; Niedballa, J?rgen; Scharf, Anne K.; Orlando, Ludovic; Balkenhol, Niko; Hofer, Heribert; Kramer-Schadt, Stephanie; Fickel, J?rns; Kitchener, Andrew C.

    2015-01-01

    Although significantly more money is spent on the conservation of tigers than on any other threatened species, today only 3200 to 3600 tigers roam the forests of Asia, occupying only 7% of their historical range. Despite the global significance of and interest in tiger conservation, global approaches to plan tiger recovery are partly impeded by the lack of a consensus on the number of tiger subspecies or management units, because a comprehensive analysis of tiger variation is lacking. We anal...

  16. A plan for time-phased incorporation of automation and robotics on the US space station

    Science.gov (United States)

    Purves, R. B.; Lin, P. S.; Fisher, E. M., Jr.

    1988-01-01

    A plan for the incorporation of Automation and Robotics technology on the Space Station is presented. The time phased introduction of twenty two selected candidates is set forth in accordance with a technology development forecast. Twenty candidates were chosed primarily for their potential to relieve the crew of mundane or dangerous operations and maintenance burdens, thus freeing crew time for mission duties and enhancing safety. Two candidates were chosen based on a potential for increasing the productivity of laboratory experiments and thus directly enhancing the scientific value of the Space Station. A technology assessment for each candidate investigates present state of the art, development timelines including space qualification considerations, and potential for technology transfer to earth applications. Each candidate is evaluated using a crew workload model driven by crew size, number of pressurized U.S. modules and external payloads, which makes it possible to assess the impact of automation during a growth scenario. Costs for each increment of implementation are estimated and accumulated.

  17. Multipurpose exciter with low phase noise

    Science.gov (United States)

    Conroy, B.; Le, D.

    1989-01-01

    Results of an effort to develop a lower-cost exciter with high stability, low phase noise, and controllable phase and frequency for use in Deep Space Network and Goldstone Solar System Radar applications are discussed. Included is a discussion of the basic concept, test results, plans, and concerns.

  18. Grave New World? Workplace Skills for Today's College Graduates

    Science.gov (United States)

    Eisner, Susan

    2010-01-01

    Today's college graduates face an uncertain and demanding job market in which they are likely to encounter evolving skill needs, reduced hiring, and heightened competition from experienced laid off workers and globally available labor. These realities underscore the importance expressed by educators and practitioners of identifying attributes new…

  19. Perspectives on Gandhi’s Significance Today

    Directory of Open Access Journals (Sweden)

    Michael Simpson

    2016-12-01

    Full Text Available Gandhi’s example has inspired countless political struggles worldwide over the past century. We might then ask how his thought has been transferred and translated when taken out of the particular historical and geographic context in which he lived. How have Gandhi’s ideas been changed or altered when adopted in different contexts? Which aspects of Gandhi’s thinking remain most relevant to struggles for social and environmental justice today? These are just a few of the questions that were discussed at the “Perspectives on Gandhi’s Significance Workshop” hosted by Reed College in Portland Oregon (USA, on April 16th, 2016.

  20. Compact toroid development: activity plan for field reversed configurations

    International Nuclear Information System (INIS)

    1984-06-01

    This document contains the description, goals, status, plans, and approach for the investigation of the properties of a magnetic configuration for plasma confinement identified as the field reversed configuration (FRC). This component of the magnetic fusion development program has been characterized by its potential for physical compactness and a flexible range of output power. The included material represents the second phase of FRC program planning. The first was completed in February 1983, and was reported in DOE/ER-0160; Compact Toroid Development. This planning builds on that previous report and concentrates on the detailed plans for the next several years of the current DOE sponsored program. It has been deliberately restricted to the experimental and theoretical efforts possible within the present scale of effort. A third phase of this planning exercise will examine the subsequent effort and resources needed to achieve near term (1987 to 1990) FRC technical objectives

  1. "USA Today": Comparative Analysis with Two National and Two Los Angeles Daily Newspapers. Research Bulletin.

    Science.gov (United States)

    Ames, Steve; And Others

    Sections of the newspaper "USA Today" were compared with corresponding sections of four major newspapers--the "New York Times," the "Wall Street Journal," the "Los Angeles Herald Examiner," and the "Los Angeles Times"--to determine what editorial components made "USA Today" different and…

  2. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  3. Business planning for scientists and engineers

    Energy Technology Data Exchange (ETDEWEB)

    Servo, J.C.; Hauler, P.D.

    1992-03-01

    Business Planning for Scientists and Engineers is a combination text/workbook intended for use by individuals and firms having received Phase II SBIR funding (Small Business Innovation Research). It is used to best advantage in combination with other aspects of the Commercialization Assistance Project developed by Dawnbreaker for the US Department of Energy. Although there are many books on the market which indicate the desired contents of a business plan, there are none which clearly indicate how to find the needed information. This book focuses on the how of business planning: how to find the needed information; how to keep yourself honest about the market potential; how to develop the plan; how to sell and use the plan.

  4. Dance, Sexuality, and Education Today: Observations for Dance Educators

    Science.gov (United States)

    Risner, Doug S.

    2004-01-01

    This paper aims to provide a comprehensive discussion of sexuality and dance education from multiple perspectives including public schools (K-12), private studios, conservatories, and higher education. Among innumerable potential topics emanating from this review of sexuality and dance education in the 21st century, this article focuses on today's…

  5. Interfaith Education: A New Model for Today's Interfaith Families

    Science.gov (United States)

    Gordon, Sheila C.; Arenstein, Benjamin

    2017-01-01

    With societal changes rapidly transforming cultures that had been largely homogenous, today's multi-cultural--and in particular interfaith--families need new educational strategies to help them understand their cultural roots and identify and clarify what aspects of their heritages they wish to nurture and transmit to their children. This paper…

  6. Three-phase Resonant DC-link Converter

    DEFF Research Database (Denmark)

    Munk-Nielsen, Stig

    The purpose of the project is to develop a three-phase resonant converter suitable for standard speed drives. The motivation for working with resonant converters is found in the problem of the standard converter type used today. In standard converter type Pulse Width Modulated-Voltage Source...... Inverter, PWM-VSI, the switches are subject to high current and voltage stress during switching, which causes losses. The fast switching of modern switches reduces switching losses. Unfortunately this procedure increased dv/dt and the size of the input/output filters of the PWM-SVI must be increased...

  7. Nuclear emergency plans in France. Strengths and weaknesses. Report 2016

    International Nuclear Information System (INIS)

    Boilley, David; Josset, Mylene

    2016-01-01

    This report first presents nuclear emergency plans in France (specific intervention plans, action at the municipal level, creation of a national plan, planning of the post-accidental phase, integration of the international and cross-border dimension. Then, it analyses strengths and weaknesses of these plans. It outlines the necessity to take the most severe accident scenarios into account (issue of selection of reference accidents, necessity of reviewing emergency planning areas, and assessment of the number of inhabitants about French nuclear installations). It proposes a review of measures of protection of populations (information, sheltering, iodine-based prophylaxis, evacuation, food control and restrictions, protection of human resources, cross-border problems). It discusses how to put an end to the emergency situation, and the assessment and collaboration on emergency plans. The next part proposes an analysis of noticed strengths and weaknesses in some PPIs (specific intervention plans) in terms of text accessibility, of description of the site and of its environment, of intervention area, of operational measures, and of preparation to the post-accidental phase

  8. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  9. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  10. “Maternal Health and Family Planning Distance Education” experience among physicians: a three-phase study to determine the educational needs, develop education program, and evaluate efficacy of the education administered

    Science.gov (United States)

    Ciftci, Bestami; Uzel, Nesibe; Ozel, M Onur; Zergeroglu, Sema; Deger, Cetin; Turasan, S Sare; Karakoc, Ayse Gul; Ozbalci, Semra

    2016-01-01

    Aim This study aims to assess the educational needs of family practitioners and evaluate the efficacy of the ongoing “Maternal Health and Family Planning Distance Education” program conducted by the General Directorate of Health Research (SAGEM) of the Turkish Ministry of Health. Methods This study consisted of three phases. In the first phase, an online survey on maternal health and family planning educational needs was sent to 20,611 physicians via e-mail. Of the 20,611 physicians, 4,729 completed the survey. In the second phase, of the 1,061 physicians registered to the education program, 632 physicians with active participation were included. In the third phase, the preeducation expectations of 287 physicians and posteducation satisfaction of 54 physicians were analyzed with a questionnaire. Results The majority of the physicians were employed in a family health center (97.4%) and practicing for 16–20 years (23.2%) without any prior in-service training (60.9%). High-to-very high educational need was expressed by 56.4% of physicians for pregnancy, delivery, and puerperality. Topics that the physicians, including both those with ≥16 years in practice and without prior in-service training, expressed need for more detailed content were pregnancy, delivery, and puerperality (37.5%); emergency obstetric approach in the primary care setting (33.1%); and gynecological infectious diseases and treatment approach (32.4%). Following the education program, the participants’ expectations were fulfilled in terms of refreshing their knowledge, particularly in the field of Maternal Health and Family Planning (87.1% and 75.9%) and the percentage of participants who expressed that they had sufficient high level knowledge increased from 55% to 68.5%. Conclusion The education on Maternal Health and Family Planning refreshed the knowledge of participants and highly met the preeducation expectations. Determining the educational needs and expectations of the target

  11. Disentangling self-management goal setting and action planning: A scoping review.

    Directory of Open Access Journals (Sweden)

    Stephanie Anna Lenzen

    Full Text Available The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used.A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used.Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up. Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67% did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60% focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47% reported a theoretical framework.The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might

  12. The University as an Institution Today: Topics for Reflection | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Today, in both the developing and industrialized worlds, the vital role of higher ... However, as the end of the second millennium draws near, we must reflect upon the ... Its philosophy, missions, functions, objectives, structures, and service to ...

  13. Los Angeles International Airport Runway Incursion Studies: Phase III--Center-Taxiway Simulation

    Science.gov (United States)

    Madson, Michael D.

    2004-01-01

    Phase III of the Los Angeles International Airport Runway Incursion Studies was conducted, under an agreement with HNTB Corporation, at the NASA Ames FutureFlight Central (FFC) facility in June 2003. The objective of the study was the evaluation of a new center-taxiway concept at LAX. This study is an extension of the Phase I and Phase II studies previously conducted at FFC. This report presents results from Phase III of the study, in which a center-taxiway concept between runways 25L and 25R was simulated and evaluated. Phase III data were compared objectively against the Baseline data. Subjective evaluations by participating LAX controllers were obtained with regard to workload, efficiency, and safety criteria. To facilitate a valid comparison between Baseline and Phase III data, the same scenarios were used for Phase III that were tested during Phases I and II. This required briefing participating controllers on differences in airport and airline operations between 2001 and today.

  14. Integrated account of method, site selection and programme prior to the site investigation phase[Planning for a Swedish repository for spent nuclear fuels

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    In order to dispose of the spent nuclear fuel in a safe manner, SKB plans to site a deep repository and an encapsulation plant with associated canister fabrication and transportation system. After an integrated evaluation of feasibility studies and other material, SKB will proceed with investigations of the rock and studies regarding establishment of the deep disposal system in the municipality of Oskarshamn or in Northern Uppland. The plans also include further study of the prospects for a deep repository in the municipality of Nykoeping. In the municipality of Oskarshamn, SKB plans further studies of a siting of the deep repository at Simpevarp. There SKB wants to initiate site investigations with test drilling. For the encapsulation plant, SKB wants to continue studying a siting at CLAB. In Northern Uppland, SKB plans to study two siting alternatives for the deep repository. One is Forsmark in the municipality of Oesthammar, where SKB wants to initiate a site investigation with test drilling. The other is Tierp north of Skutskaer, where SKB intends to start test drilling in an area north of Tierp. First, however, a suitable drilling area with possible transport solutions needs to be defined. This alternative requires the participation of the municipalities of both Tierp and Aelvkarleby. A siting of the encapsulation plant in Northern Uppland will also be studied. For the municipality of Nykoeping, SKB plans to conduct a new safety assessment for the Fjaellveden area, based on data from previous investigations as well as additional studies of how a deep repository could be arranged. SKB will thereby gather data from yet another geographic and geological region beyond those that are prioritized. No test drilling is planned in Nykoeping. The goal of the site investigation phase is to obtain all permits needed to build the planned facilities. It will take an estimated 7 - 8 years to assemble the requisite supporting material, carry out consultations, compile siting

  15. Adaptive Intelligence Planning: The Combatant Command J2 Fulcrum for Leveraging National Intelligence Support and Resources Today and Tomorrow

    National Research Council Canada - National Science Library

    Current, Michael L

    2007-01-01

    ...) requirements in their Operation Plans (OPLAN). Given the amount of attention on viewed disconnects between the IC and the warfighter, it may come as a surprise that some GCC/FCCs remain reluctant to invest time and attention to AIP...

  16. Simulation For Synchronization Of A Micro-Grid With Three-Phase Systems

    Directory of Open Access Journals (Sweden)

    Mohammad Jafari Far

    2015-08-01

    Full Text Available Abstract today due to the high reliability of the micro-grids they have developed significantly. They have two states of operation the island state and connection to the main grid. Under certain circumstances the micro-grid is connected to or disconnected from the network. Synchronization of a micro-grid with the network must be done when its voltage is synchronized with the voltage in the main grid. Phase lock loops are responsible to identify the voltage phase of the micro-gird and the main grid and when these two voltages are in the same phase they connect the micro-grid to the main grid. In this research the connection of a micro-grid to the main grid in the two phases of synchronous and asynchronous voltage is simulated and investigated.

  17. Voces (Voices): A Profile of Today's Latino College Students

    Science.gov (United States)

    Santiago, Deborah A.

    2007-01-01

    Latinos are the youngest and fastest growing ethnic group in the United States. It is imperative that institutional leaders and decision makers have a better understanding of Latino students today in order to shape the policies and practices to serve college students in the future. Currently, disparate statistics about Latino students in higher…

  18. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  19. [The practicum in physiology: from Laufberger to today].

    Science.gov (United States)

    Kuthan, V; Sedlácek, J; Trojan, S

    1990-09-21

    An outline of Prof. Laufberger's concept of practical exercises in physiology, proposed just after the Second World War, is given. Especially, his new pedagogical approach is emphasized, here. Further, the development of the organization of practical courses in the Institute of Physiology in Prague is described: e.g. the modernization of the methods used, and of the educational process in early 70 s'. Today, the importance of biocybernetics is growing.

  20. Nature and history today: the ecological crisis

    Directory of Open Access Journals (Sweden)

    Luciano ESPINOSA RUBIO

    2012-02-01

    Full Text Available Today, the Nature-History relations are the ecological ones: we are living in a global eco-bio-techno-noos-sphere and that means that ecological crisis is a crisis of civilization too. Above all, the climate change and its social and political consequences will have a great impact in our lives, and we must respond without losing our rights. In the intellectual way, we need new narrations in order to affront the situation and perhaps the theory of the lesser evil is one of the better answers that we can find.

  1. Ideologies in the Swedish health sector today

    DEFF Research Database (Denmark)

    Diderichsen, Finn

    1982-01-01

    Sweden has a long tradition of social democracy and corporate cooperation. Social problems are treated as technological questions that always should be solved through rational and neutral means. Today Sweden faces a crisis of economy as well as a crisis of medicine. In the spirit of consensus, th...... system of primary care and prevention. However, in the context of the current economic crisis, the struggle against health hazards and cuts in public spending has intensified and the gap between the ideology of technological rationalism and reality has widened....

  2. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-08-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Martin Marietta Energy Systems, Inc. to prepare a Phase H Sampling Plan to describe field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures. To address deficiencies noted by the regulators, the following activities will be conducted: Background surface soil and surface water/sediment samples will be collected based on statistical considerations for comparison to site data. Existing and new data to be collected will be used to support a human health risk assessment that includes the future homesteader scenario. Biological surveys, samples, and measurements will be collected/conducted to augment existing data and support an ecological risk assessment. Another round of groundwater sampling will be conducted, including on-site wells and the wells on Chestnut Ridge downgradient of the Security Pits. Borings will be completed in the FCAP to collect samples from below the surface depth to describe the chemical characteristics and volume of the ash. The volume of ash associated with sluice channel on Chestnut Ridge will be determined. Soil samples will be corrected below the coal ash in the FCAP and adjacent to sluice channel to evaluate soil contamination and migration of contaminants

  3. CONCEPTUAL CLARIFICATION OF PLANNING AND STRATEGIC THINKING IN HUMAN RESOURCE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Matei ȘTEFAN

    2013-10-01

    Full Text Available Many of the concepts and techniques for strategic management have been developed and successfully applied within many companies. As managers are trying to manage better and to face the changes in economical climate, a company develops over four phases of strategic actions and management. These phases consist of basic financial planning, prognosis-based planning, external environment oriented planning and strategic management. Moreover, strategic management consists of four basic elements which ensure a structured format for examination of company strategies: scanning the business environment, strategy formulation, strategy implementation, evaluation and control.

  4. How Danish communal heat planning empowers municipalities and benefits individual consumers

    International Nuclear Information System (INIS)

    Chittum, Anna; Østergaard, Poul Alberg

    2014-01-01

    Danish municipal heat planning empowers municipalities to implement locally appropriate energy solutions that are the best fit for the locality as a whole and the individual consumers served. Supportive policies and actions at the national and local levels have encouraged heat planning that confers significant autonomy to local governments. By examining how power is distributed and shared by different levels of governments in the planning process, this paper investigates how comprehensive energy planning in Denmark has supported the development of highly cost-effective district heating systems. Lessons from the Danish approach to heat planning are considered for their relevance to the United States, where significant technical district heating potential exists, yet remains well outside the typical energy policy discussions. While the specific Danish political context may not be transferable to other locations, the practical aspects of power sharing, socio-economic cost–benefit analyses, and communal decision-making may inform approaches to local heat planning around the world. - Highlights: • Danish district heating has cost-effectively reduced the country's emissions. • Danish heat planning has been critical to the district heating sector's success. • Danish heat planning confers substantial power to municipalities. • Empowering cities offers significant benefits to cities and consumers. • Danish planning practices can be implemented today in the U.S. and other locations

  5. What Do Young People Today Really Think about Jesus?

    Science.gov (United States)

    Walshe, Karen

    2005-01-01

    This article presents the key findings of a recent study investigating young people's knowledge and understanding of Jesus and demonstrates how young people today appear to be experiencing the same difficulties when engaging with the figure of Jesus in the religious education classroom as they did almost 40 years ago. It concludes by suggesting…

  6. Education of Women in Today's World: Implications for Counsellors ...

    African Journals Online (AJOL)

    The result for research questions two revealed that all the items listed were accepted as problems of women in education sector. The third research question also revealed that all the items listed were accepted as things which education has done in the lives of women in Today's World, implications for Counsellors were also ...

  7. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2014-11-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  8. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2016-01-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  9. Contextualization of Brazilian energy policy: SALTE Plan to Brasil para todos plan; Contextualizacao da politica energetica brasileira: do Plano SALTE ao Plano Brasil para Todos

    Energy Technology Data Exchange (ETDEWEB)

    Longo, Riolando; Bermann, Celio [Universidade de Sao Paulo (IEE/USP), SP (Brazil). Inst. de Eletrotecnica e Energia. Programa de Pos-graduacao em Energia

    2010-07-01

    Brazil has accumulated a significant experience in governmental planning from 1940 onwards. Since the first attempts after the Second World War, the country has tried to create and implement several governmental plans, starting with the SALTE (In Portuguese SALTE is the acronym of Health, Food, Transport and Energy) Plan in 1947 and continuing with various other plans until current days. Throughout the last six decades, Brazil has undertaken diverse attempts to plan and better organize the process of national economic development. This work presents a historical evaluation of the public politics implemented in the sectors - Energy and Industrial - to verify the existence of a correlation and dependence between them, from the second half of the twentieth century until today. Brazil has become more mature from the industrial point of view and has managed to progress in technology throughout these plans. However, despite some isolated sector progress, Brazilian society has remained imbalanced and the lower-class continued to suffer from inequality in education, health and living standards. Due to political changes, the evolution of energy demand and industrial consumption expansion, this study analyses in the period mentioned above, the historical behavior; the economic, industrial and energy trends of the country. (author)

  10. Upgrade plans for hadron calorimeter in the CMS detector

    International Nuclear Information System (INIS)

    Dugad, Shashikant R.

    2010-01-01

    The Large Hadron Collider (LHC) is expected to undergo upgrades in two phases in next decade. Luminosity at the completion of the second phase is expected to increase by an order of magnitude to 10 35 /cm 2 s. The upgrade of the CMS Hadron Calorimeter (HCAL) is being planned to sustain an increased dose of radiation and challenges arising from occupancy rate due to higher luminosity. Replacement of existing photo readout device by silicon photomultipliers is being planned for the HCAL. Detailed studies performed on this device are presented. Plans on the upgrade of the front-end electronics, DAQ, trigger, and the active elements in some part of the detector will be discussed in detail.

  11. Integration and test planning patterns in different organizations

    NARCIS (Netherlands)

    Jong, de I.S.M.; Boumen, R.; Mortel - Fronczak, van de J.M.; Rooda, J.E.; Tretmans, J.

    2007-01-01

    Planning an integration and test phase is often done by experts in the visited organizations. These experts have a thorough knowledge about the system, integration and testing and the business drivers of an organization. An integration and test plan developedfor an airplane is different than the

  12. Simultaneous optimization of sequential IMRT plans

    International Nuclear Information System (INIS)

    Popple, Richard A.; Prellop, Perri B.; Spencer, Sharon A.; Santos, Jennifer F. de los; Duan, Jun; Fiveash, John B.; Brezovich, Ivan A.

    2005-01-01

    Radiotherapy often comprises two phases, in which irradiation of a volume at risk for microscopic disease is followed by a sequential dose escalation to a smaller volume either at a higher risk for microscopic disease or containing only gross disease. This technique is difficult to implement with intensity modulated radiotherapy, as the tolerance doses of critical structures must be respected over the sum of the two plans. Techniques that include an integrated boost have been proposed to address this problem. However, clinical experience with such techniques is limited, and many clinicians are uncomfortable prescribing nonconventional fractionation schemes. To solve this problem, we developed an optimization technique that simultaneously generates sequential initial and boost IMRT plans. We have developed an optimization tool that uses a commercial treatment planning system (TPS) and a high level programming language for technical computing. The tool uses the TPS to calculate the dose deposition coefficients (DDCs) for optimization. The DDCs were imported into external software and the treatment ports duplicated to create the boost plan. The initial, boost, and tolerance doses were specified and used to construct cost functions. The initial and boost plans were optimized simultaneously using a gradient search technique. Following optimization, the fluence maps were exported to the TPS for dose calculation. Seven patients treated using sequential techniques were selected from our clinical database. The initial and boost plans used to treat these patients were developed independently of each other by dividing the tolerance doses proportionally between the initial and boost plans and then iteratively optimizing the plans until a summation that met the treatment goals was obtained. We used the simultaneous optimization technique to generate plans that met the original planning goals. The coverage of the initial and boost target volumes in the simultaneously optimized

  13. New problem with sales, inventories, and operations planning in a supply chain environment

    Science.gov (United States)

    Thomas, Andre; Lamouri, Samir

    2000-10-01

    The highest level of planning and control system is necessary, because production and logistics systems are not so flexible to follow, from day to day, sales evolutions. The companies are therefore held to standardize the good practices concerning the elaboration of their Sales, Inventories and Operations Planning (SIOP). The SIOP makes it possible to implement the strategic objectives defined by Top Management at the time of the Business Plan. It is the link between sales and manufacturing planning. The objectives of each of those depend on the specificity of their trade: the Sales Department will go for a maximum sales whereas Production will endeavor to keep industrial cost prices as low as possible while the Finance Department will try to optimize the use of available funds. There are several tools for this optimization: Graphical method and linear programming. Today, the economic context requires robust optimization.

  14. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    International Nuclear Information System (INIS)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Health Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ''shall'' is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project

  15. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    Energy Technology Data Exchange (ETDEWEB)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Health Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

  16. The Pauli-Jung conjecture and its impact today

    CERN Document Server

    Fuchs, Christopher A

    2014-01-01

    Related to the key areas of Pauli''s and Jung''s joint interests, the book covers overlapping issues from the perspectives of physics, philosophy, and psychology. Of primary significance are epistemological questions connected to issues such as realism, measurement, observation, consciousness, and the unconscious. The contributions assess the extensive material that we have about Pauli''s and Jung''s ideas today, with particular respect to concrete research questions and projects based on and re...

  17. Towards a framework for geospatial tangible user interfaces in collaborative urban planning

    Science.gov (United States)

    Maquil, Valérie; Leopold, Ulrich; De Sousa, Luís Moreira; Schwartz, Lou; Tobias, Eric

    2018-03-01

    The increasing complexity of urban planning projects today requires new approaches to better integrate stakeholders with different professional backgrounds throughout a city. Traditional tools used in urban planning are designed for experts and offer little opportunity for participation and collaborative design. This paper introduces the concept of geospatial tangible user interfaces (GTUI) and reports on the design and implementation as well as the usability of such a GTUI to support stakeholder participation in collaborative urban planning. The proposed system uses physical objects to interact with large digital maps and geospatial data projected onto a tabletop. It is implemented using a PostGIS database, a web map server providing OGC web services, the computer vision framework reacTIVision, a Java-based TUIO client, and GeoTools. We describe how a GTUI has be instantiated and evaluated within the scope of two case studies related to real world collaborative urban planning scenarios. Our results confirm the feasibility of our proposed GTUI solutions to (a) instantiate different urban planning scenarios, (b) support collaboration, and (c) ensure an acceptable usability.

  18. Towards a framework for geospatial tangible user interfaces in collaborative urban planning

    Science.gov (United States)

    Maquil, Valérie; Leopold, Ulrich; De Sousa, Luís Moreira; Schwartz, Lou; Tobias, Eric

    2018-04-01

    The increasing complexity of urban planning projects today requires new approaches to better integrate stakeholders with different professional backgrounds throughout a city. Traditional tools used in urban planning are designed for experts and offer little opportunity for participation and collaborative design. This paper introduces the concept of geospatial tangible user interfaces (GTUI) and reports on the design and implementation as well as the usability of such a GTUI to support stakeholder participation in collaborative urban planning. The proposed system uses physical objects to interact with large digital maps and geospatial data projected onto a tabletop. It is implemented using a PostGIS database, a web map server providing OGC web services, the computer vision framework reacTIVision, a Java-based TUIO client, and GeoTools. We describe how a GTUI has be instantiated and evaluated within the scope of two case studies related to real world collaborative urban planning scenarios. Our results confirm the feasibility of our proposed GTUI solutions to (a) instantiate different urban planning scenarios, (b) support collaboration, and (c) ensure an acceptable usability.

  19. Surrounded by Water: Talking to Learn in Today's Classrooms

    Science.gov (United States)

    Ernst-Slavit, Gisela; Wenger, Kerri J.

    2016-01-01

    The authors explore the importance of talk and interaction for learning, particularly in relation to new K-12 standards and the prominent role of academic language in today's educational contexts. The article concludes with a detailed example of a Grade 6 teacher's use of content and language objectives to address the needs and strengths of all…

  20. National Guard > About the Guard > Today in Guard History

    Science.gov (United States)

    National Guard About Us By the Numbers Contact Us FAQ Federal Mission History Join Us Leaders Director of Program Training & Technology Battle Lab (T3BL) Civil Support Simulation Exercises Regional Training March Today in Guard History Leadership CNGB VCNGB SEA DANG DARNG Joint Staff J-1 J-2 J-3 J-4 J-5 J-6 J

  1. Approaches to the Study of Pragmatism in Today's China

    Science.gov (United States)

    Chengbing, Wang

    2017-01-01

    To explore the key approaches to pragmatism is not only a logical requirement of the development of pragmatism itself, but also necessary for Chinese pragmatism to progress. There are three major necessary and feasible approaches to the study of pragmatism, which will play a very important role in the development of Pragmatism in today's China:…

  2. SU-F-J-99: Dose Accumulation and Evaluation in Lung SBRT Among All Phases of Respiration

    Energy Technology Data Exchange (ETDEWEB)

    Azcona, JD; Barbes, B; Aristu, J; Moreno, M; Zubiria, A [Clinica Universidad de Navarra, Pamplona (Spain); Burguete, J [Universidad de Navarra, Pamplona, Navarra (Spain); Arce, P; Lagares, JI [Centro de Investigaciones Energeticas, Medioambientales, y Tecnologicas, Madrid (Spain)

    2016-06-15

    Purpose: To calculate the total planning dose on lung tumors (GTV) by accumulating the dose received in all respiration phases. Methods: A patient 4D planning CT (phase-binned, from a Siemens Somatom CT) was used to locate the GTV of a lung tumor in all respiratory phases with Pinnacle (v9.10). GTV contours defined in all phases were projected to the reference phase, where the ITV was defined. Centroids were calculated for all the GTV projections. No deformation or rotation was taken into account. The only GTV contour as defined in the reference phase was voxelized to track each voxel individually. We accumulated the absorbed dose in different phases on each voxel. A 3DCRT and a VMAT plan were designed on the reference phase fulfilling the ITV dosimetric requirements, using the 10MV FFF photon model from an Elekta Versa linac. ITV-to-PTV margins were set to 5mm. In-house developed MATLAB code was used for tumor voxeling and dose accumulation, assuming that the dose distribution planned in the reference phase behaved as a “dose-cloud” during patient breathing. Results: We tested the method on a patient 4DCT set of images exhibiting limited tumor motion (<5mm). For the 3DCRT plan, D95 was calculated for the GTV with motion and for the ITV, showing an agreement of 0.04%. For the VMAT plan, we calculated the D95 for every phase as if the GTV in that phase had received the whole treatment. Differences in D95 for all phases are within 1%, and estimate the potential interplay effect during delivery. Conclusion: A method for dose accumulation and assessment was developed that can compare GTV motion with ITV dosage, and estimate the potential interplay effect for VMAT plans. Work in progress includes the incorporation of deformable image registration and 4D CBCT dose calculation for dose reconstruction and assessment during treatment.

  3. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    Science.gov (United States)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  4. STRATEGIC PLANNING AS A SUPPORTING TOOL TO DETERMINE MILITARY CAPABILITIES

    Directory of Open Access Journals (Sweden)

    DAVID VILLACIS PAZOS

    2017-09-01

    Full Text Available Planning by scenarios, also called prospective, is of great value in high turbulent and volatile environments, as is today, because it permits to visualize the future from a spectrum of possibilities. That visualization is strategic information that provides a competitive edge and facilitates the identification of possible threats in each scenario and in front of those threats determines the required capacities needed. Therefore, prospective planning is an indispensable tool for decision making and determining military capacities. The scenario spectrum could consider an infinite number; however, for a strategic analysis it is basic to visualize at least three options: an optimist, a pessimist, and a tendency. To determine the military capacities, it is a required minimum to consider the traditional and non-traditional threats, as well as “foreseeable” and “feasible” capacities. The present article provides a global vision of prospective planning and its relationship with determining military capacities.

  5. Modeling of diffusional phase transformation in multi-component systems with stoichiometric phases

    Czech Academy of Sciences Publication Activity Database

    Svoboda, Jiří; Fischer, F. D.; Abart, R.

    2010-01-01

    Roč. 58, č. 8 (2010), s. 2905-2911 ISSN 1359-6454 R&D Projects: GA MŠk(CZ) OC10029 Institutional research plan: CEZ:AV0Z20410507 Keywords : Interdiffusion * Intermetallics * Phase transformation kinetics Subject RIV: BJ - Thermodynamics Impact factor: 3.781, year: 2010

  6. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process

  7. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  8. 41 CFR 101-26.506 - Interior planning and design services.

    Science.gov (United States)

    2010-07-01

    ... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...

  9. OSUL2013: Fostering Organizational Change through a Grassroots Planning Process

    Science.gov (United States)

    Schlosser, Melanie

    2011-01-01

    This paper provides background on planning and organizational culture change in libraries and describes a grassroots planning process taking place at the Ohio State University Libraries. Now in its third phase, the process aims to create a long-term plan for the organization while fostering a more collaborative, innovative culture.

  10. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  11. Canada's green plan: Summary. Le plan vert du Canada: Resume

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    A summary is presented of Canada's Green Plan, a comprehensive action plan to ensure a healthy environment for the future. The plan defines targets and schedules which will drive federal environmental initiatives, and incorporates concepts of sustainable development. Elements of the plan include initiatives to combat and prevent water pollution; control ocean dumping; control smog-causing emissions; provide tighter air pollution standards; provide for sound waste management according to the principles of reduce, reuse, recycle, and recover; assess and control chemical wastes; sustain Canadian forests and maintain their diversity while shifting forest management from sustained yield to sustainable development; maintain and enhance environmental sustainability in the agro-food sector and the fishery sector; preserve and protect national parks and wildlife; and preserve and enhance the integrity, health, biodiversity and productivity of Arctic ecosystems. With respect to global-scale problems, measures will be taken to stabilize greenhouse gas emissions, limit acid rain-related emissions, and phase out the use of ozone-depleting substances. The plan also intends to improve Canada's capability to respond to environmental emergencies, improve environmental decision-making by strengthening and building of partnerships, promote environmental science research and development, and make effective and balanced use of enviromental laws, with market-based approaches for environmental protection.

  12. 25 CFR 1000.20 - What is required in a planning report?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What is required in a planning report? 1000.20 Section....20 What is required in a planning report? As evidence that the Tribe/Consortium has completed the planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a...

  13. Comics: a medium for today's development messages.

    Science.gov (United States)

    Opilas, E A

    1978-03-01

    Filipino illustrated magazines, or the comics, may yet prove to be the most effective media, if not the most effective, for spreading the country's development messages. Long criticized by intellectuals and the social elite, the comics have been grossly underrated in their potential to inform, persuade, and even influence the life-style of the people. The government's Commission on Population (Popcom) has developed an information-education-communication program using the comics, among other media, to disseminate stories on family planning, responsible parenthood, and related topics. Its best quality is popular appeal, and for publishers and distribution outlets, the comics provide good business. A review of these materials shows that their themes reflect the following topics or issues: 1) population trends and consequences; 2) socioeconomic benefits of family planning; 3) customs which influence family planning; 4) family planning concepts; 5) family planning methods; 6) human sexuality and reproduction; 7) the husband-wife relationship; 8) guides for family planning motivation or communication; and 9) guides for teaching family planning. The materials were developed with 4 qualities in mind so as to attract audience or reader interest: simplicity, familiarity, realism, and attractiveness of materials. The consensus is that in the comics, population and development agencies may have found a "secret weapon" in getting these messages across, and that this new-found use for the illustrated magazines may be giving them a new respectability without in any way diminishing their popular appeal.

  14. Constructing a modern cytology laboratory: A toolkit for planning and design.

    Science.gov (United States)

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction

  15. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  16. A Study of End Users' Perceived Usefulness of and Satisfaction with Enterprise Resource Planning Systems in Higher Education

    Science.gov (United States)

    Su, Shau E. Eve

    2012-01-01

    Enterprise resource planning (ERP) systems have become necessities in today's educational arena and are used extensively to improve office productivity and institutional efficacy. As the implementation of ERP systems usually is costly and time-consuming, it is imperative for administrators to understand how end users adopt the introduced…

  17. A Strategic Planning Process Model for Distance Education

    Science.gov (United States)

    Pisel, Kenneth P.

    2008-01-01

    As more institutions seek to implement or expand distance learning programs, it becomes critical to integrate distance learning programs into broader strategic visions and plans. Using the informed opinion from a panel of peer-nominated experts via iterative Delphi questionnaires, a 10-phased strategic planning process model for distance education…

  18. Poverty in Capitalism. Why is it Persisting Today?

    Directory of Open Access Journals (Sweden)

    Víctor Manuel Isidro Luna

    2013-11-01

    Full Text Available The purpose of this paper is to provide elements to reflect on the way poverty is nowadays conceptualized and on its causing factors. This paper discusses that a classic-neoclassical frame of reference cannot explain the persistence or increase of poverty in today's developed countries. This article suggests that through a Marxist historic-descriptive and theoretical-logical method it may be possible to gain understanding about poverty in capitalism and its current evolution.

  19. Medium Term Economic Effects of Peak Oil Today

    OpenAIRE

    Dr. Ulrike Lehr; Dr. Christian Lutz; Kirsten Wiebe

    2011-01-01

    The paper at hand presents results of a model-based scenario analysis on the economic implications in the next decade of an oil peak today and significantly decreasing oil production in the coming years. For that the extraction paths of oil and other fossil fuels given in LBST (2010) are implemented in the global macroeconomic model GINFORS. Additionally, the scenarios incorporate different technological potentials for energy efficiency and renewable energy, which cannot be forecast using eco...

  20. Simulating the Phases of the Moon Shortly after Its Formation

    Science.gov (United States)

    Noordeh, Emil; Hall, Patrick; Cuk, Matija

    2014-01-01

    The leading theory for the origin of the Moon is the giant impact hypothesis, in which the Moon was formed out of the debris left over from the collision of a Mars sized body with the Earth. Soon after its formation, the orbit of the Moon may have been very different than it is today. We have simulated the phases of the Moon in a model for its…

  1. Phases of QCD

    Energy Technology Data Exchange (ETDEWEB)

    Roessner, Simon

    2009-04-09

    Quantum Chromodynamics (QCD) is the theory of the strong interaction within the Standard Model of elementary particles. Today's research in this area dedicates substantial resources to numeric solutions of the QCD field equations and experimental programs exploring the phases of QCD. This thesis proceeds along a complementary line - that of modelling QCD, with the aim of identifying its dominant degrees of freedom. This is possible by minimally coupling effective potentials for the Polyakov loop to Nambu-Jona-Lasinio models using temporal background fields to model chiral symmetry breaking respecting colour confinement. The fermion sign problem resulting from the minimal coupling is addressed in this work establishing a novel, systematically ordered approach. The modifications to the approximative order parameter of colour confinement, the Polyakov loop, are in direct connection with the fermion sign problem. Furthermore an effective coupling of quark densities of different flavours is induced. This mechanism, most likely also present in QCD, produces finite contributions to flavour off diagonal susceptibilities. Susceptibilities are amongst the most promising physical quantities for the experimental exploration of the phase transition at high temperatures and densities. (orig.)

  2. Visions of Students Today: A Message from the Editors

    Science.gov (United States)

    Wentzell, G. W.; Richlin, L.; Cox. M. D.

    2012-01-01

    In Michael Wesch's (2007) now widely seen video "A Vision of Students Today" (http://www.youtube.com/watch?v=dGCJ46vyR9o), a camera pans across a large, traditional classroom where college students hold up messages about themselves as members of the current generation of learners, who have been dubbed Millennials (Howe & Strauss, 2000). The video…

  3. Acoustics of ancient Greek and Roman theaters in use today

    DEFF Research Database (Denmark)

    Gade, Anders Christian; Angelakis, Konstantinos

    2006-01-01

    In the Mediteranan area a large number of open, ancient Greek and Roman theatres are still today facing a busy schedule of performances including both classical and contemporary works of dance, drama, concerts, and opera. During the EU funded ``Erato'' project and a subsequent master thesis project...

  4. Teaching the Interrelationships among Costs, Expense, and Liability of a Defined Benefit Pension Plan

    Science.gov (United States)

    Wilson, Arlette C.; Godwin, Norman H.

    2008-01-01

    The Financial Accounting Standards Board (FASB) recently issued Statement of Financial Accounting Standards No. 158 "Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans" (SFAS #158). Their intent is to comprehensively reconsider the accounting for postretirement benefit plans in phases. The first phase was to provide…

  5. GRIST-2 preliminary test plan and requirements for fuel fabrication and preirradiation

    International Nuclear Information System (INIS)

    Tang, I.M.; Harmon, D.P.; Torri, A.

    1978-12-01

    The preliminary version of the GRIST-2 test plan has been developed for the planned initial 5 years (1984 to 1989) of TREAT-Upgrade in-pile tests. These tests will be employed to study the phenomenology and integral behavior of GCFR core disruptive accidents (CDAs) and to support the Final Safety Analysis Report (FSAR) CDA analyses for the demonstration plant licensing. The preliminary test plan is outlined. Test Phases I and II are for the fresh fuel (preconditioned or not) CDA behavior at the beginning-of-life (BOL) reactor state. Phase III is for the reactor state that contains irradiated fuel with a saturated content of helium and fission gas. Phase IV is for larger bundle tests and scaling effects

  6. Developing and executing a strategic plan.

    Science.gov (United States)

    Morley, Glenn

    2010-02-01

    Because of the historic economic crisis, the past 18 months--2008 and the first half of 2009--have been challenging for many plastic surgery practices. Prior to the economic crisis in 2008, many practices enjoyed success with little synchronization between financial and productivity results, practice goals, and strategic planning. Now, suddenly, there is a great deal of interest in the alignment of budgets and financial reporting, marketing return on investment (ROI), staff accountability, and overhead management. The process of developing a business plan can serve to bring clarity and objectivity to the assessment of practice goals and market dynamics. The business planning process also provides assurance of more efficient use of the practice's human and capital resources. Ultimately, the process will bring order, discipline, and focus to practice stakeholders, thus increasing the likelihood of meeting or exceeding practice goals. The process: (1) defining the mission of the practice; (2) completing a competitive analysis for your market; (3) completing an assessment of your current environment; (4) completing an assessment of the financial health of your practice; (5) preparation of a SWOT (strengths, weakness, opportunity, threat) analysis; and (6) a translation of your mission statement into specific long-term goals and short-term performance objectives. The outcome of completing these tasks should be an actionable plan that will serve as a guide or road map for the practice. A well-articulated plan will solidify staff confidence, continue the advancement of a strong business foundation, and provide clear navigation through this new economic landscape in a way that preserves your ability to provide the care you have devoted yourselves to deliver. Today's needs, and yesterday's lessons, dictate that a well-documented strategic action plan be undertaken. Thieme Medical Publishers.

  7. The Situation Analysis Study of the family planning program in Kenya.

    Science.gov (United States)

    Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A

    1991-01-01

    A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.

  8. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  9. The Coolness of Capitalism Today

    Directory of Open Access Journals (Sweden)

    Jim McGuigan

    2012-05-01

    Full Text Available This paper is about the reconciliation of cultural analysis with political economy in Marxist-inspired research on communications. It traces how these two traditions became separated with the development of a one-dimensional and consumerist cultural studies, on the one-hand, and a more classically Marxist political economy of communications, on the other hand, that was accused of holding a simplistic and erroneous concept of ideology. The paper defends a conception of ideology as distorted communication motivated by unequal power relations and sketches a multidimensional mode of cultural analysis that takes account of the moments of production, consumption and textual meaning in the circulation of communications and culture. In accordance with this framework of analysis, the cool-capitalism thesis is outlined and illustrated with reference to Apple, the ‘cool’ corporation. And, the all-purpose mobile communication device is selected as a key and urgent focus of attention for research on commodity fetishism and labour exploitation on a global scale today.

  10. Gas market is today strategical

    International Nuclear Information System (INIS)

    Darricarrere, Y.L.

    2006-01-01

    The energy market, and in particular the gas market, is today seething with excitement. In France, in Europe and in the rest of the world, the energy stakes are in the center of preoccupations. This article is an interview of Y.L. Darricarrere, general director of the gas and electricity division of Total group, who explains his opinions about the opening of European and French energy markets, presents the ambitions of Total group on these markets, and comments some recent events of the European energy scene: concentration between gas and electric utilities, the Suez and Gaz de France (GdF) project of merger, the risks linked with the coming in of national companies from producing countries, like Gazprom and Sonatrach, on the European market, the restriction of access of foreign companies to hydrocarbon reserves in Russia and Latin America (come back of the 'energy nationalism'), Total's policy for anticipating the increase of the world energy demand and the depletion of fossil fuel reserves. (J.S.)

  11. Coho Salmon Master Plan, Clearwater River Basin.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe; FishPro

    2004-10-01

    uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation

  12. Choosing conditions of liquid-phase epitaxy of Insub(1-x)Gasub(x)P solid solutions by statistical methods of experiment planning

    International Nuclear Information System (INIS)

    Batyrev, N.I.; Vigdorovich, V.N.; Selin, A.A.

    1978-01-01

    Insub(1-x)Gasub(x)P(x approximately 0.7) solid solution layers obtained with the help of the phase diagram of the In-InP-GaP system have been studied using statistical methods of experiment planning. The liquidus, baric and solidus surfaces have been plotted for the In-InP-GaP ternary system (In content from 85 to 100 mol.%). Analysis of the results obtained makes it possible to determine the optimum compositions of the melt (x=0.67-0.74) and building-up temperatures (800-850 deg) to obtain epitaxyal Insub(1-x)Gasub(x)P layers

  13. What criteria should now be applied in energy resource planning

    International Nuclear Information System (INIS)

    Puechl, K.H.

    1976-01-01

    Twenty years ago decisions on nuclear power were made on purely economic grounds. Little attention was given to public acceptability, broad-scope cost/benefit analysis, environmental impacts, or conservation of resources. In the light of the significantly different situation that exists today, were the proper decisions made, and what should now be the basis for proper comparable analysis. Acknowledging that energy resource planning is extremely complex, a logical approach is suggested that provides a more meaningful basis for public choice and decision-making. (author)

  14. Doublet III: status and future plans

    International Nuclear Information System (INIS)

    Rawls, J.M.

    1980-04-01

    A synopsis is presented of the experimental results from the ohmic heating phase of Doublet III, with emphasis on the production of good target plasmas for the upcoming neutral beam injection phase. The program plan for the device over the life of the US-Japan cooperative program is discussed, as is the status of the preliminary investigation into replacing the present vacuum vessel by one better suited for ETF simulation

  15. Moments for Movement: Photostories from the 1980s Resonate Today

    Science.gov (United States)

    Barndt, Deborah; Erickson, Kris

    2017-01-01

    This chapter offers an intergenerational reflection on the production of photostories in the Toronto-based Moment Project of the 1980s, considering how its features of co-creation, creative forms, and critical social content could be reinvented with the new digital media forms integral to today's social movements.

  16. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for ∼4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures

  17. From resilience thinking to Resilience Planning: Lessons from practice.

    Science.gov (United States)

    Sellberg, M M; Ryan, P; Borgström, S T; Norström, A V; Peterson, G D

    2018-07-01

    Resilience thinking has frequently been proposed as an alternative to conventional natural resource management, but there are few studies of its applications in real-world settings. To address this gap, we synthesized experiences from practitioners that have applied a resilience thinking approach to strategic planning, called Resilience Planning, in regional natural resource management organizations in Australia. This case represents one of the most extensive and long-term applications of resilience thinking in the world today. We conducted semi-structured interviews with Resilience Planning practitioners from nine organizations and reviewed strategic planning documents to investigate: 1) the key contributions of the approach to their existing strategic planning, and 2) what enabled and hindered the practitioners in applying and embedding the new approach in their organizations. Our results reveal that Resilience Planning contributed to developing a social-ecological systems perspective, more adaptive and collaborative approaches to planning, and that it clarified management goals of desirable resource conditions. Applying Resilience Planning required translating resilience thinking to practice in each unique circumstance, while simultaneously creating support among staff, and engaging external actors. Embedding Resilience Planning within organizations implied starting and maintaining longer-term change processes that required sustained multi-level organizational support. We conclude by identifying four lessons for successfully applying and embedding resilience practice in an organization: 1) to connect internal "entrepreneurs" to "interpreters" and "networkers" who work across organizations, 2) to assess the opportunity context for resilience practice, 3) to ensure that resilience practice is a learning process that engages internal and external actors, and 4) to develop reflective strategies for managing complexity and uncertainty. Copyright © 2018 The Authors

  18. Master plan for remediation of the Sillamaee tailings pond and technical design project

    International Nuclear Information System (INIS)

    Kaasik, T.

    2000-01-01

    Remediation of the Sillamaee radioactive tailings pond is a priority in the Estonian National Environmental Plan. The Sillamaee plant has processed metal ores by hydrometallurgical methods since 1946. Processing continued until 1990, but in the 1970s, production of rare earths and rare metals was introduced and continues today at a smaller scale. The tailings pond contains residues from these operations. The environmental problems associated with the tailings pond are the stability of the dam and the release of contaminants. In order to deal with these two issues effectively, a master plan was drawn up. The master plan covers the period from 1997 to 2008 and was compiled with the cooperation of the Silmet Group and the Sillamaee International Expert Reference Group (SIERG). The master plan sets up a systematic approach for the overall tailings pond remediation, including drying its interior, reshaping and covering the surface, minimizing water flow through the tailings, and ensuring long-term dam stability

  19. Maximizing value for planned maintenance and turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Crager, John [Asset Performance Canada, ULC (Canada)

    2011-07-01

    In this presentation, Asset Performance Canada elaborates on turnaround management, and provides insight into managing strategies and risks associated with turnaround processes. Value is created fast as turnarounds progress from the strategy and scope definition phases towards the planning and execution phases. Turnarounds employ best practice solutions through common processes proven effective by data, research, and experience, ensuring consistent value creation, performance tracking, and shared lesson-learning. Adherence to the turnaround work process by carefully selected planning team members with clearly defined responsibilities and expectations, as well as an effective process for scope collection and management, are crucial to turnaround success. Further to this, a formal risk management process, employing automated risk tracking software and a safety management plan for assessing risks and their severity is also invaluable in avoiding any additional costs and schedule delays. Finally, assessment of team readiness and alignment through use of the turnaround readiness index, and rapid management of discovery work, can aid in contingency management.

  20. Solar central receiver hybrid power system. Phase I study

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    A management plan is presented for implementation during the Solar Central Receiver Hybrid Power System - Phase I study project. The project plan and the management controls that will be used to assure technically adequate, timely and cost effective performance of the work required to prepare the designated end products are described. Bechtel in-house controls and those to be used in directing the subcontractors are described. Phase I of the project consists of tradeoff studies, parametric analyses, and engineering studies leading to conceptual definition and evaluation of a commercial hybrid power system that has the potential for supplying economically competitive electric power to a utility grid in the 1985-1990 time frame. The scope also includes the preparation of a development plan for the resolution of technical uncertainties and the preparation of plans and a proposal for Phase II of the program. The technical approach will be based on a central receiver solar energy collection scheme which supplies thermal energy to a combined cycle, generating system, consisting of a gas turbine cycle combined with a steam bottoming cycle by means of a heat recovery steam generator.