WorldWideScience

Sample records for permitting conditions imposed

  1. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  2. Effects of the imposed pressure differential conditions on duoplasmatron performance

    International Nuclear Information System (INIS)

    Oztarhan, A.

    1988-01-01

    The duoplasmatron plasma source (D.P.T.) was modified to allow access to the arc discharge (to measure the discharge properties) and to vary independently the pressures in different volumes of the arc with the aim of seeing if this freedom would help in optimising the output. The duoplasmatron plasma source was operated under normal running condition (N.R.C.), positive imposed pressure differential condition (P.I.P.D.C.) and negative imposed pressure differential condition (N.I.P.D.C.) and the corresponding properties of the plasma output were measured. Running the duoplasmatron under P.I.P.D. condition did not seem to improve the output as compared to that under N.R.C. However, running the duoplasmatron under N.I.P.D. condition seemed to be advantageous as the output increased by about 30%. It was observed that the back pressure was critical in maintaining the arc and the gap pressure could be lowered much below the normal minimum (while the arc was on) if back pressure was kept above a critical value. The results showed that the effects of varying the dimensions of the intermediate electrode nozzle on the output could be understood in terms of the effect of changes in these dimensions on the relative pressures. An empirical expression for the effect of the pressure ratio was developed from the observations and compared with the experimental results. The reasons for various results can be related to the plasma emission mechanism. (author). 8 refs, 6 figs, 1 tab

  3. HANDBOOK: GUIDANCE ON SETTING PERMIT CONDITIONS AND REPORTING TRIAL BURN RESULTS

    Science.gov (United States)

    This Handbook provides guidance for establishing operational conditions for incinerators. he document provides a means for state and local agencies to achieve a level of consistency in setting permit conditions that will result in establishment of more uniform permit conditions n...

  4. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  5. 7 CFR 330.203 - Action on applications for permits to move plant pests; form of and conditions in permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Action on applications for permits to move plant pests... PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.203 Action on applications for permits to move plant pests; form of and conditions in...

  6. 50 CFR 665.249 - Lobster size and condition restrictions in Permit Area 2.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Lobster size and condition restrictions in... WESTERN PACIFIC Hawaii Fisheries § 665.249 Lobster size and condition restrictions in Permit Area 2. (a) Only spiny lobsters with a carapace length of 8.26 cm or greater may be retained (see Figure 1 to this...

  7. Evaluation of the conditions imposed by the fracture surface geometry on water seepage through fractured porous media

    International Nuclear Information System (INIS)

    Fuentes, Nestor O.; Faybishenko, B.

    2003-01-01

    In order to determine the geometric patterns of the fracture surfaces that imposes conditions on the fluid flow through fractured porous media, a series a fracture models have been analyzed using the RIMAPS technique and the variogram method. Results confirm that the main paths followed by the fluid channels are determined by the surface topography and remain constant during water seepage evolution. Characteristics scale lengths of both situations: fracture surface and the flow of water, are also found. There exists a relationship between the scale lengths corresponding to each situation. (author)

  8. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  9. Experimental investigation of exercise-related hedonic responses to preferred and imposed media content.

    Science.gov (United States)

    Frith, Emily; Loprinzi, Paul D

    2018-01-01

    Background: We evaluated the differential influence of preferred versus imposed media selections on distinct hedonic responses to an acute bout of treadmill walking. Methods: Twenty university students were recruited for this [160 person-visit] laboratory experiment, which employed a within-subject, counter-balanced design. Participants were exposed to 8 experimental conditions, including (1) Exercise Only, (2) Texting Only, (3) Preferred Phone Call, (4) Imposed Phone Call, (5) Preferred Music Playlist, (6) Imposed Music Playlist, (7)Preferred Video and (8) Imposed Video. During each visit (except Texting Only), participants completed a 10-minute bout of walking on the treadmill at a self-selected pace. Walking speed was identical for all experimental conditions. Before, at the midpoint of exercise, and post-exercise, participants completed the Feeling Scale (FS) and the Felt Arousal Scale (FAS) to measure acute hedonic response. The Affective Circumplex Scale was administered pre-exercise and post-exercise. Results: Significant pre-post change scores were observed for happy (Imposed Call: P=0.05;Preferred Music: P=0.02; Imposed Video: P=0.03), excited (Exercise Only: P=0.001; PreferredVideo: P=0.01; Imposed Video: P=0.03), sad (Preferred Music: P=0.05), anxious (ExerciseOnly: P=0.05; Preferred Video: P=0.01), and fatigue (Exercise Only: P=0.03; Imposed Video:P=0.002). For the FS all change scores were statistically significant from pre-to-mid and pre-topost (Pmedia platforms substantively influences hedonic responses to exercise. Implications of these findings are discussed.

  10. Wind turbine blade vibration at standstill conditions — the effect of imposing lag on the aerodynamic response of an elastically mounted airfoil

    DEFF Research Database (Denmark)

    Skrzypinski, Witold Robert; Gaunaa, Mac

    2015-01-01

    The present study investigated physical phenomena related to stall-induced vibrations potentially existing on wind turbine blades at standstill conditions. The study considered two-dimensional airfoil sections while it omitted three-dimensional effects. In the study, a new engineering-type...... computational model for the aeroelastic response of an elastically mounted airfoil was used to investigate the influence of temporal lag in the aerodynamic response on the aeroelastic stability in deep stall. The study indicated that even a relatively low lag significantly increases the damping of the model....... A comparison between the results from a model with lag imposed on all force components with the results from a model with lag imposed exclusively on the lift showed only marginal difference between the damping in the two cases. A parameter study involving positions of the elastic hinge point and the center...

  11. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  12. 78 FR 64905 - Carriage of Conditionally Permitted Shale Gas Extraction Waste Water in Bulk

    Science.gov (United States)

    2013-10-30

    ...-ZA31 Carriage of Conditionally Permitted Shale Gas Extraction Waste Water in Bulk AGENCY: Coast Guard... availability of a proposed policy letter concerning the carriage of shale gas extraction waste water in bulk... transport shale gas extraction waste water in bulk. The policy letter also defines the information the Coast...

  13. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  14. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  15. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  16. 32 CFR 767.7 - Conditions of permits.

    Science.gov (United States)

    2010-07-01

    ... GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE JURISDICATION OF THE... to submit to NHC a working and diving log listing days spent in field research, activities pursued... protect all sensitive information regarding the location and character of the wreck site that could...

  17. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  18. Tradeable CO2 emission permits for cost-effective control of global warming

    International Nuclear Information System (INIS)

    Kosobud, R.F.; South, D.W.; Daly, T.A.; Quinn, K.G.

    1991-01-01

    Many current global warming mitigation policy proposals call for large, near-term reductions in CO 2 emissions, thereby entailing high initial carbon emission tax rates or permit prices. This paper claims that these high initial tax rates or permit prices are not cost-effective in achieving the desired degree of climate change control. A cost-effective permit system is proposed and described that, under certain assumptions, would allow markets to optimally lead permit prices along a gradually increasing trajectory over tie. This price path presents the Hotelling result and would ease the abrupt, inefficient, and costly adjustments imposed on the fossil fuel and other industries in current proposals. This finding is demonstrated using the Argonne Model, a linear programming energy- environmental-economic model that allows for intertemporal optimization of consumer energy well-being. 12 refs., 3 figs., 1 tab

  19. Imposing resolved turbulence in CFD simulations

    DEFF Research Database (Denmark)

    Gilling, L.; Sørensen, Niels N.

    2011-01-01

    In large‐eddy simulations, the inflow velocity field should contain resolved turbulence. This paper describes and analyzes two methods for imposing resolved turbulence in the interior of the domain in Computational Fluid Dynamics simulations. The intended application of the methods is to impose...

  20. Arc Motion in an Obliquely Imposed Alternating Magnetic Field

    International Nuclear Information System (INIS)

    Akiho, R; Takeda, K; Sugimoto, M

    2012-01-01

    The arc motion is theoretically investigated under an alternating magnetic field imposed obliquely to the arc. The arc is known to oscillate on a 2-D plane when the alternating magnetic field is imposed perpendicularly to the arc. If the alternating magnetic field is imposed obliquely to the arc, then it is expected that the arc oscillates not on the 2-D plane but in a 3-D space. For this study, 3-D simulation was performed on the motion of the plasma gas under an alternating magnetic field crossing obliquely to the arc. It was also assumed that a stream line of the plasma gas represented the arc profile. The momentum equation for the plasma gas was solved together with the continuity equation. Governing parameters for the gas motion are θ (crossing angle), v 0 (initial velocity of the plasma gas), and λ. Parameter λ is defined as λ = (I a B 0 )/Q 0 . Numerical results are reported under different operating conditions such as magnetic flux densities and the angles between the arc and the magnetic flux. If the crossing angle is larger than 4/π, the arc might be extinguished because of the drastic increase of the arc length.

  1. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  2. Remark on Trautman's Radiation Condition

    International Nuclear Information System (INIS)

    Walker, M.

    1979-01-01

    The confusion about the boundary conditions for radiating systems formulated by Trautman are discussed. The confusion has mainly to do with where in space-time the conditions are to be imposed but also with what is it that the conditions are intended to guarantee. Imposing Trautman's conditions near future null infinity allows the existence of outgoing radiation; in order to exclude incoming radiation, they must be imposed near (or at) past null infinity. Since receding to infinity in spacelike directions means that one crosses all radiation, whether in- or outgoing, it makes no sense to impose the conditions at spatial infinity. If one were to impose fall-off of the electromagnetic field in flat space-time of 1/n at spatial infinity, then the field would contain finite energy. (Auth.)

  3. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  4. Self-Imposed Creativity Constraints

    DEFF Research Database (Denmark)

    Biskjaer, Michael Mose

    2013-01-01

    Abstract This dissertation epitomizes three years of research guided by the research question: how can we conceptualize creative self-binding as a resource in art and design processes? Concretely, the dissertation seeks to offer insight into the puzzling observation that highly skilled creative...... practitioners sometimes freely and intentionally impose rigid rules, peculiar principles, and other kinds of creative obstructions on themselves as a means to spur momentum in the process and reach a distinctly original outcome. To investigate this the dissertation is composed of four papers (Part II) framed...... of analysis. Informed by the insight that constraints both enable and restrain creative agency, the dissertation’s main contention is that creative self- binding may profitably be conceptualized as the exercise of self-imposed creativity constraints. Thus, the dissertation marks an analytical move from vague...

  5. 21 CFR 530.20 - Conditions for permitted extralabel animal and human drug use in food-producing animals.

    Science.gov (United States)

    2010-04-01

    ... consumption: (1) Such use must be accomplished in accordance with an appropriate medical rationale; and (2) If... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Conditions for permitted extralabel animal and human drug use in food-producing animals. 530.20 Section 530.20 Food and Drugs FOOD AND DRUG...

  6. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  7. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  8. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  9. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    International Nuclear Information System (INIS)

    Rehdanz, Katrin; Tol, Richard S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission reduction target and export more permits. This in turn would not only reduce the costs for both countries as less emissions have to be reduced, but it also lowers the environmental benefits of the importing country. One price instrument (tariff) and two quantity instruments (discount, quota) to prevent the exporting country from issuing more permits are examined. Each instrument restricts trade and alters the terms of trade for the two countries. The importing country (and regulator) prefers an import tariff and an import quota to a carbon discount. If the exporting country releases additional permits, the importing country should not try to keep total emissions constant, as that would be ineffective and maybe even counterproductive. Instead, the importing country should aim to keep the total import constant; this would impose costs on the exporting country that are independent of the policy instrument; an import quota would be the cheapest option for the importing country. An import quota would also stress the idea of supplementary of the flexible mechanism as it increases the share of emissions reduced domestically. Compliance and liability issues constrain the market further. However, both the importing and the exporting country would prefer that the permit seller is liable in case of non-compliance, as sellers' liability would less constrain the market

  10. 40 CFR 52.2184 - Operating permits for minor sources.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52... permits for minor sources. Emission limitations and related provisions established in South Dakota minor... right to deem permit conditions not federally enforceable. Such a determination will be made according...

  11. Legal theology in imposed constitutionalism

    DEFF Research Database (Denmark)

    Abat Ninet, Antoni

    2018-01-01

    The focus of this paper is the question of legitimacy, and how can we consider legitimate an imposed constitution and the subsequent constitutional principles, practices and values that go hand-in-hand with the legal and political acculturation. Constitutional texts around the world are good...

  12. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  13. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  14. 42 CFR 488.430 - Civil money penalties: Basis for imposing penalty.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Civil money penalties: Basis for imposing penalty... PROCEDURES Enforcement of Compliance for Long-Term Care Facilities with Deficiencies § 488.430 Civil money penalties: Basis for imposing penalty. (a) CMS or the State may impose a civil money penalty for either the...

  15. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  16. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  17. 42 CFR 460.40 - Violations for which CMS may impose sanctions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Violations for which CMS may impose sanctions. 460... for which CMS may impose sanctions. In addition to other remedies authorized by law, CMS may impose any of the sanctions specified in §§ 460.42 and 460.46 if CMS determines that a PACE organization...

  18. Are the force characteristics of synchronous handcycling affected by speed and the method to impose power?

    NARCIS (Netherlands)

    Arnet, U.; van Drongelen, S.V.; van der Woude, L.H.V.; Veeger, H.E.J.

    2012-01-01

    Objective: To investigate the influence of exercise conditions (speed and method to impose power) on the applied force, force effectiveness and distribution of work during handcycling. Method: Ten able-bodied men performed handcycling on a treadmill. To test the effect of speed, subjects propelled

  19. Are the force characteristics of synchronous handcycling affected by speed and the method to impose power?

    NARCIS (Netherlands)

    Arnet, Ursina; van Drongelen, Stefan; Veeger, DirkJan H. E. J.; van der Woude, Lucas H. V.

    Objective: To investigate the influence of exercise conditions (speed and method to impose power) on the applied force, force effectiveness and distribution of work during handcycling. Method: Ten able-bodied men performed handcycling on a treadmill. To test the effect of speed, subjects propelled

  20. Jump conditions in transonic equilibria

    International Nuclear Information System (INIS)

    Guazzotto, L.; Betti, R.; Jardin, S. C.

    2013-01-01

    In the present paper, the numerical calculation of transonic equilibria, first introduced with the FLOW code in Guazzotto et al.[Phys. Plasmas 11, 604 (2004)], is critically reviewed. In particular, the necessity and effect of imposing explicit jump conditions at the transonic discontinuity are investigated. It is found that “standard” (low-β, large aspect ratio) transonic equilibria satisfy the correct jump condition with very good approximation even if the jump condition is not explicitly imposed. On the other hand, it is also found that high-β, low aspect ratio equilibria require the correct jump condition to be explicitly imposed. Various numerical approaches are described to modify FLOW to include the jump condition. It is proved that the new methods converge to the correct solution even in extreme cases of very large β, while they agree with the results obtained with the old implementation of FLOW in lower-β equilibria.

  1. ACID SPLASH: QISAS PUNISHMENT TO BE IMPOSED AGAINST THE OFFENDER

    Directory of Open Access Journals (Sweden)

    Mohammed Farid Huzaimi

    2013-02-01

    Full Text Available In Islamic countries, there are cases where a court has given punishment to an acid splasher to be punished by acid as well. In 2004, an Iranian woman was blinded with acid by her suitor for turning down his marriage proposal. Four years later, the Iranian court sentenced the offender to be blinded in both eyes for taking away the woman’s sight under the retribution principle permitted under Iran’s Islamic law. This case’s decision has regularly been objected as the punishment seems inhuman. This paper will discuss in detail the nature of the offence and the punishment imposed in Islamic perspective. Terdapat beberapa kasus di negara-negara Islam di mana pengadilan memberikan hukuman pembalasan terhadap terdakwa yang menyiram cairan asam ke tubuh orang lain. Pada tahun 2004, seorang perempuan Iran dibutakan dengan asam oleh peminangnya setelah si perempuan menolak lamaran pria tersebut. Empat tahun setelahnya, pengadilan di Iran memutuskan untuk menghukum pria tersebut dengan hukuman yang sama, yaitu dibutakan dengan asam. Hukuman ini dijatuhkan dengan dasar asas retribusi menurut hukum Islam di Iran. Putusan hakim dalam kasus ini telah menuai kritik karena hukuman tersebut dianggap tidak berperikemanusiaan. Artikel ini akan membahas lebih dalam tentang perbuatan menyiram cairan asam dan hukuman pembalasan menurut perspektif Islam.

  2. Game theoretic analysis for carbon emission permits trading among multiple world regions with an optimizing global energy model; Saitekikagata sekai energy model ni motozuku tachiikikan CO2 haishutsu kyokasho torihiki no game ronteki bunseki

    Energy Technology Data Exchange (ETDEWEB)

    Akimoto, K.; Matsunaga, A.; Fujii, Y. [Yokohama National University, Yokohama (Japan); Yamaji, K. [The University of Tokyo, Tokyo (Japan)

    1998-10-01

    Carbon emissions which would cause global warming were agreed to be constrained at COP3 in Kyoto. In addition, carton emission permits trading was also approved to be introduced. The emission permits trading is expected to achieve efficient carbon emission reduction, equalizing the marginal costs of the emission reduction for the participating countries. In other words, the permits trading allows participants to reduce emissions where it is least expensive to do so. However, the inadequate introduction of the trading systems may impose unfairly greater burden on some countries, and therefore careful evaluation of the system would be indispensable for its implementation. In this paper, we attempt to analyze the emission permits trading. using the theory of cooperative games with a global energy model of optimization type. We assumed that seven world regions as players participate the permits trading system under the condition of the emission reduction target presented at COP3 and so on, and show the nucleolus of the grand coalition games, and the computational results of primary energy supplies and CO2 shadow prices. The insights of this research indicate that in order to stabilize the grand coalition, a noticeable amount of additional transfer of money would be needed besides the payments associated with the emission permits trading. 10 refs., 7 figs., 5 tabs.

  3. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  4. A critical role of lateral hypothalamus in context-induced relapse to alcohol seeking after punishment-imposed abstinence.

    Science.gov (United States)

    Marchant, Nathan J; Rabei, Rana; Kaganovsky, Konstantin; Caprioli, Daniele; Bossert, Jennifer M; Bonci, Antonello; Shaham, Yavin

    2014-05-28

    In human alcoholics, abstinence is often self-imposed, despite alcohol availability, because of the negative consequences of excessive use. During abstinence, relapse is often triggered by exposure to contexts associated with alcohol use. We recently developed a rat model that captures some features of this human condition: exposure to the alcohol self-administration environment (context A), after punishment-imposed suppression of alcohol self-administration in a different environment (context B), provoked renewal of alcohol seeking in alcohol-preferring P rats. The mechanisms underlying context-induced renewal of alcohol seeking after punishment-imposed abstinence are unknown. Here, we studied the role of the lateral hypothalamus (LH) and its forebrain projections in this effect. We first determined the effect of context-induced renewal of alcohol seeking on Fos (a neuronal activity marker) expression in LH. We next determined the effect of LH reversible inactivation by GABAA + GABAB receptor agonists (muscimol + baclofen) on this effect. Finally, we determined neuronal activation in brain areas projecting to LH during context-induced renewal tests by measuring double labeling of the retrograde tracer cholera toxin subunit B (CTb; injected in LH) with Fos. Context-induced renewal of alcohol seeking after punishment-imposed abstinence was associated with increased Fos expression in LH. Additionally, renewal was blocked by muscimol + baclofen injections into LH. Finally, double-labeling analysis of CTb + Fos showed that context-induced renewal of alcohol seeking after punishment-imposed abstinence was associated with selective activation of accumbens shell neurons projecting to LH. The results demonstrate an important role of LH in renewal of alcohol seeking after punishment-imposed abstinence and suggest a role of accumbens shell projections to LH in this form of relapse. Copyright © 2014 the authors 0270-6474/14/347447-11$15.00/0.

  5. Permitted and forbidden sets in symmetric threshold-linear networks.

    Science.gov (United States)

    Hahnloser, Richard H R; Seung, H Sebastian; Slotine, Jean-Jacques

    2003-03-01

    The richness and complexity of recurrent cortical circuits is an inexhaustible source of inspiration for thinking about high-level biological computation. In past theoretical studies, constraints on the synaptic connection patterns of threshold-linear networks were found that guaranteed bounded network dynamics, convergence to attractive fixed points, and multistability, all fundamental aspects of cortical information processing. However, these conditions were only sufficient, and it remained unclear which were the minimal (necessary) conditions for convergence and multistability. We show that symmetric threshold-linear networks converge to a set of attractive fixed points if and only if the network matrix is copositive. Furthermore, the set of attractive fixed points is nonconnected (the network is multiattractive) if and only if the network matrix is not positive semidefinite. There are permitted sets of neurons that can be coactive at a stable steady state and forbidden sets that cannot. Permitted sets are clustered in the sense that subsets of permitted sets are permitted and supersets of forbidden sets are forbidden. By viewing permitted sets as memories stored in the synaptic connections, we provide a formulation of long-term memory that is more general than the traditional perspective of fixed-point attractor networks. There is a close correspondence between threshold-linear networks and networks defined by the generalized Lotka-Volterra equations.

  6. 9 CFR 82.24 - Other interstate movements and special permits.

    Science.gov (United States)

    2010-01-01

    ... issued, and the special conditions under which the interstate movement, or cleaning and disinfection, may...; and (iv) The reason for the interstate movement. (2) For cleaning and disinfection, the special permit... prescribed by this subpart. A special permit is required for the disinfection of vehicles, premises, cages...

  7. Cyber security issues imposed on nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Do-Yeon

    2014-01-01

    Highlights: • Provide history of cyber attacks targeting at nuclear facilities. • Provide cyber security issues imposed on nuclear power plants. • Provide possible countermeasures for protecting nuclear power plants. - Abstract: With the introduction of new technology based on the increasing digitalization of control systems, the potential of cyber attacks has escalated into a serious threat for nuclear facilities, resulting in the advent of the Stuxnet. In this regard, the nuclear industry needs to consider several cyber security issues imposed on nuclear power plants, including regulatory guidelines and standards for cyber security, the possibility of Stuxnet-inherited malware attacks in the future, and countermeasures for protecting nuclear power plants against possible cyber attacks

  8. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  9. Resource Conservation and Recovery Act permit modifications and the functional equivalency demonstration: a case study

    International Nuclear Information System (INIS)

    Elsberry, K.; Garcia, P.; Carnes, R.; Kinker, J.; Loehr, C.; Lyon, W.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements that specific components and equipment be used. Consequently, changing these items, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are ''functionally equivalent.'' The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. In performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent. In this case, the key performance data included gas residence time and distribution of flow over the activated carbon. Because both units were custom designed and fabricated, a simple comparison of manufacturers' specifications was impossible. Therefore, numerical simulation of each unit design was performed using the TEMPEST thermal-hydraulic computer code to model isothermal hydrodynamic performance under steady-state conditions. The results of residence time calculations from the model were coupled with flow proportion and sampled using a Monte Carlo-style simulation to derive distributions that describe the predicted residence times

  10. DOCUMENT IMAGE REGISTRATION FOR IMPOSED LAYER EXTRACTION

    Directory of Open Access Journals (Sweden)

    Surabhi Narayan

    2017-02-01

    Full Text Available Extraction of filled-in information from document images in the presence of template poses challenges due to geometrical distortion. Filled-in document image consists of null background, general information foreground and vital information imposed layer. Template document image consists of null background and general information foreground layer. In this paper a novel document image registration technique has been proposed to extract imposed layer from input document image. A convex polygon is constructed around the content of the input and the template image using convex hull. The vertices of the convex polygons of input and template are paired based on minimum Euclidean distance. Each vertex of the input convex polygon is subjected to transformation for the permutable combinations of rotation and scaling. Translation is handled by tight crop. For every transformation of the input vertices, Minimum Hausdorff distance (MHD is computed. Minimum Hausdorff distance identifies the rotation and scaling values by which the input image should be transformed to align it to the template. Since transformation is an estimation process, the components in the input image do not overlay exactly on the components in the template, therefore connected component technique is applied to extract contour boxes at word level to identify partially overlapping components. Geometrical features such as density, area and degree of overlapping are extracted and compared between partially overlapping components to identify and eliminate components common to input image and template image. The residue constitutes imposed layer. Experimental results indicate the efficacy of the proposed model with computational complexity. Experiment has been conducted on variety of filled-in forms, applications and bank cheques. Data sets have been generated as test sets for comparative analysis.

  11. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Deshaye, Joyce; Bloomquist, R. Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  12. Economic Impact of Imposing Excise Tax on Plastic Bottles of Drinks

    Directory of Open Access Journals (Sweden)

    Eugenia Mardanugraha

    2018-03-01

    Full Text Available This research simulates the effect of imposing excise tax on plastic container of drinks towards economic performance of beverage industry in Indonesia and governmentâ˘A ´Zs tax revenue. The results showed that by imposing excise tax on plastic cups and plastic bottles the government would lose tax revenue from value added tax (PPN and corporate income tax (PPh badan more than they gain additional revenue from excise tax. Hence, imposing excise tax on drink containers should serve a clear purpose and an undeniable reason. This paper recommends the government to develop proper excise infrastructure to extend the goods or services to be taxed. This paper also recommends the required stages for extending the excise tax.

  13. Body size, swimming speed, or thermal sensitivity? Predator-imposed selection on amphibian larvae.

    Science.gov (United States)

    Gvoždík, Lumír; Smolinský, Radovan

    2015-11-02

    Many animals rely on their escape performance during predator encounters. Because of its dependence on body size and temperature, escape velocity is fully characterized by three measures, absolute value, size-corrected value, and its response to temperature (thermal sensitivity). The primary target of the selection imposed by predators is poorly understood. We examined predator (dragonfly larva)-imposed selection on prey (newt larvae) body size and characteristics of escape velocity using replicated and controlled predation experiments under seminatural conditions. Specifically, because these species experience a wide range of temperatures throughout their larval phases, we predict that larvae achieving high swimming velocities across temperatures will have a selective advantage over more thermally sensitive individuals. Nonzero selection differentials indicated that predators selected for prey body size and both absolute and size-corrected maximum swimming velocity. Comparison of selection differentials with control confirmed selection only on body size, i.e., dragonfly larvae preferably preyed on small newt larvae. Maximum swimming velocity and its thermal sensitivity showed low group repeatability, which contributed to non-detectable selection on both characteristics of escape performance. In the newt-dragonfly larvae interaction, body size plays a more important role than maximum values and thermal sensitivity of swimming velocity during predator escape. This corroborates the general importance of body size in predator-prey interactions. The absence of an appropriate control in predation experiments may lead to potentially misleading conclusions about the primary target of predator-imposed selection. Insights from predation experiments contribute to our understanding of the link between performance and fitness, and further improve mechanistic models of predator-prey interactions and food web dynamics.

  14. Imposed Hispanicity: How the Imposition of Racialized and Gendered Identities in Texas Affects Mexican Women in Romantic Relationships with White Men

    Directory of Open Access Journals (Sweden)

    Jennifer C. Guillén

    2015-11-01

    Full Text Available Intimate, romantic spaces are important sites for the examination of self-identification and perceived identification, especially with regard to gender and racial power. In this article I examine how white men in romantic relationships or marriages with Mexican women and residing in Texas, impose “Hispanic” as a racial identity as a discursive tactic that reinforces the hegemonic power of being white and being a man in order to define the situation, impose ideals that distance Mexican partners from being “too ethnic” or “threatening” in order to achieve closer proximity to “honorary whiteness” and acceptability of racial others, and creates a romantic space that is coercive instead of loving and safe. This study thus finds that white men used their hegemony to not only employ imposed Hispanicity, which I define as an institutionally created but culturally and institutionally imposed label, and an action based on the use of direct and indirect coercion and force by others, in this case, white romantic partners, for the purpose of establishing power and determining the situation in which racial definitions are made. Therefore, “Hispanic” becomes an identity that is chosen by others and while participants of Mexican descent do employ agency, the socially imposed conditions and expectations associated with “Hispanic” serve to police the identities, bodies, lives, and actions of people of Latin American descent.

  15. Imposed currents in galvanic cells

    International Nuclear Information System (INIS)

    Biesheuvel, P.M.; Soestbergen, M. van; Bazant, M.Z.

    2009-01-01

    We analyze the steady-state behavior of a general mathematical model for reversible galvanic cells, such as redox flow cells, reversible solid oxide fuel cells, and rechargeable batteries. We consider not only operation in the galvanic discharging mode, spontaneously generating a positive current against an external load, but also operation in two modes which require a net input of electrical energy: (i) the electrolytic charging mode, where a negative current is imposed to generate a voltage exceeding the open-circuit voltage, and (ii) the 'super-galvanic' discharging mode, where a positive current exceeding the short-circuit current is imposed to generate a negative voltage. Analysis of the various (dis-)charging modes of galvanic cells is important to predict the efficiency of electrical to chemical energy conversion and to provide sensitive tests for experimental validation of fuel cell models. In the model, we consider effects of diffuse charge on electrochemical charge-transfer rates by combining a generalized Frumkin-Butler-Volmer equation for reaction kinetics across the compact Stern layer with the full Poisson-Nernst-Planck transport theory, without assuming local electroneutrality. Since this approach is rare in the literature, we provide a brief historical review. To illustrate the general theory, we present results for a monovalent binary electrolyte, consisting of cations, which react at the electrodes, and non-reactive anions, which are either fixed in space (as in a solid electrolyte) or are mobile (as in a liquid electrolyte). The full model is solved numerically and compared to analytical results in the limit of thin diffuse layers, relative to the membrane thickness. The spatial profiles of the ion concentrations and electrostatic potential reveal a complex dependence on the kinetic parameters and the imposed current, in which the diffuse charge at each electrode and the total membrane charge can have either sign, contrary perhaps to intuition

  16. 9 CFR 72.13 - Permitted dips and procedures.

    Science.gov (United States)

    2010-01-01

    ... proprietary brands of permitted dips—as well the use of compressed air, vat management techniques, and other... maintained and that under actual field conditions the dipping of cattle with a solution of definite strength...

  17. 42 CFR 422.758 - Collection of civil money penalties imposed by CMS.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Collection of civil money penalties imposed by CMS... § 422.758 Collection of civil money penalties imposed by CMS. (a) When an MA organization does not request a hearing, CMS initiates collection of the civil money penalty following the expiration of the...

  18. 42 CFR 423.758 - Collection of civil money penalties imposed by CMS.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Collection of civil money penalties imposed by CMS... Intermediate Sanctions § 423.758 Collection of civil money penalties imposed by CMS. (a) When a Part D plan sponsor does not request a hearing CMS initiates collection of the civil money penalty following the...

  19. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  20. 78 FR 42540 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-07-16

    ... to the disadvantage of the listed species, and that the terms and conditions of the permit were... UNIVERSITY 207948 3/4/2013 12/31/2017 WESTERN ECOSYSTEMS TECHNOLOGY, INC 050706 10/1/2012 12/31/2015 WESTERN...

  1. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  2. 42 CFR 423.756 - Procedures for imposing intermediate sanctions and civil money penalties.

    Science.gov (United States)

    2010-10-01

    ... BENEFIT Intermediate Sanctions § 423.756 Procedures for imposing intermediate sanctions and civil money... civil money penalties. 423.756 Section 423.756 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... sanctions have been imposed, CMS may require a Part D plan sponsor to market or to accept enrollments or...

  3. Militarised violence in the service of state-imposed emergencies over Palestine and Kenya

    Directory of Open Access Journals (Sweden)

    Annie Pfingst

    2015-02-01

    Full Text Available States of Emergency are declared against the disorder-ing of state sovereign power by acts of resistance, rebellion and revolt and are characterised by the technologies of control, containment and punishment. Through spatial, archival and visual encounters with emergency landscapes and the geographies of resistance, the essay considers the historic and contemporary operations, provisions, regulations and practices authorised under state-imposed emergencies. It does so in order firstly, to bring attention to the practices authorised through state-imposed emergencies and the currency and saliency of their ongoing effects, and secondly to re-frame the militarised violence of settlement/occupation as an integral part of state-imposed emergencies in which all that is necessary will be done to protect the sovereign state from the resistance of the colonised/occupied and to effect a return to ‘order’.     Through encounters with the archival record, and the architectures, remnants and territorial arrangements found in post-colonial Kenya and across the multiple geographies of Palestine, the essay draws out seven clusters of state imposed emergency practices and effects. The work grapples with a number of questions: what is it that a declared state of emergency performs for the state? Does a state of emergency enable particular forms of militarised violence? Are there common practices to be found across different modes of state-imposed emergencies? What is the genealogy to the states of emergency across Palestine and Kenya? Does our excavation of the practices of state-imposed emergency shed light on the ways we apprehend state violence in colonial, post-colonial and neo-colonial geographies?

  4. A simple method to impose rotations and concentrated moments on ANC beams

    International Nuclear Information System (INIS)

    Romero, Ignacio; Arribas, Juan J.

    2009-01-01

    Recently introduced ANC beam elements furnish a simple formulation that allows to solve nonlinear problems of beams, including those with large displacements and strains, as well as complex nonlinear (inelastic) materials. The success and simplicity of these finite elements is mainly due to the fact that the only nodal degrees of freedom that they employ are displacements, and rotations are thus completely avoided. This in turn makes it very difficult to apply concentrated moments or to impose rotations at specific nodes of a finite element mesh. In this article, we present a simple enhancement to this beam formulation that allows to apply these two types of boundary conditions in a simple manner, making ANC beam elements more versatile for both multibody and structural applications

  5. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  6. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  7. Achieving Chemical Equilibrium: The Role of Imposed Conditions in the Ammonia Formation Reaction

    Science.gov (United States)

    Tellinghuisen, Joel

    2006-01-01

    Under conditions of constant temperature T and pressure P, chemical equilibrium occurs in a closed system (fixed mass) when the Gibbs free energy G of the reaction mixture is minimized. However, when chemical reactions occur under other conditions, other thermodynamic functions are minimized or maximized. For processes at constant T and volume V,…

  8. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  9. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  10. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  11. HANFORD SITE AIR OPERATING PERMIT SEMIANNUAL REPORT FOR THE PERIOD 07/01/2004 THRU 12/31/2004

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2005-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and September 15th each year, which are certified for truth, accuracy, and completeness by a Responsible Official. This semiannual report contains information from July 1, 2004 through December 31, 2004. Copies of semiannual reports are transmitted to the Washington State Department of Ecology (Ecology). the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the US Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, as amended in August 2002 and December 2002, identifies the following. (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5. ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period. (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2. 1.3, and 2.1, each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. Data derived from that monitoring will be reported in the Annual National Emission Standards for Hazardous Air Pollutants (NESHAP) Report (AOP, ''Standard Terms and Conditions'', Section 4.3.1). AOP requirement is for annual monitoring (e.g., four 1 week samples

  12. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  13. Creep and Environmental Durability of EBC/CMCs Under Imposed Thermal Gradient Conditions

    Science.gov (United States)

    Appleby, Matthew; Morscher, Gregory N.; Zhu, Dongming

    2013-01-01

    Interest in SiC fiber-reinforced SiC ceramic matrix composite (CMC) environmental barrier coating (EBC) systems for use in high temperature structural applications has prompted the need for characterization of material strength and creep performance under complex aerospace turbine engine environments. Stress-rupture tests have been performed on SiC/SiC composites systems, with varying fiber types and coating schemes to demonstrate material behavior under isothermal conditions. Further testing was conducted under exposure to thermal stress gradients to determine the effect on creep resistance and material durability. In order to understand the associated damage mechanisms, emphasis is placed on experimental techniques as well as implementation of non-destructive evaluation; including electrical resistivity monitoring. The influence of environmental and loading conditions on life-limiting material properties is shown.

  14. 40 CFR 147.2925 - Standard permit conditions.

    Science.gov (United States)

    2010-07-01

    ... measurement; (ii) Individual(s) who preformed the measurements; (iii) Date(s) analyses were performed; (iv) Individual(s) who performed the analyses; (v) Analytical techniques or methods used, including quality... conditions. Proper operation and maintenance also includes adequate operator staffing and training, adequate...

  15. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  16. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  17. 42 CFR 423.760 - Determinations regarding the amount of civil money penalties and assessment imposed by CMS.

    Science.gov (United States)

    2010-10-01

    ... penalties and assessment imposed by CMS. 423.760 Section 423.760 Public Health CENTERS FOR MEDICARE... penalties and assessment imposed by CMS. (a) Determining the appropriate amount of any penalty. In determining the amount of penalty imposed under 423.752(c)(1), CMS will consider as appropriate: (1) The...

  18. Alignment to natural and imposed mismatches between the senses

    NARCIS (Netherlands)

    van der Kooij, K.; Brenner, E.; van Beers, R.J.; Schot, W.D.; Smeets, J.B.J.

    2013-01-01

    Does the nervous system continuously realign the senses so that objects are seen and felt in the same place? Conflicting answers to this question have been given. Research imposing a sensory mismatch has provided evidence that the nervous system realigns the senses to reduce the mismatch. Other

  19. A Numerical Handling of the Boundary Conditions Imposed by the Skull on an Inhomogeneous Diffusion-Reaction Model of Glioblastoma Invasion Into the Brain: Clinical Validation Aspects

    Directory of Open Access Journals (Sweden)

    Georgios S Stamatakos

    2017-01-01

    Full Text Available A novel explicit triscale reaction-diffusion numerical model of glioblastoma multiforme tumor growth is presented. The model incorporates the handling of Neumann boundary conditions imposed by the cranium and takes into account both the inhomogeneous nature of human brain and the complexity of the skull geometry. The finite-difference time-domain method is adopted. To demonstrate the workflow of a possible clinical validation procedure, a clinical case/scenario is addressed. A good agreement of the in silico calculated value of the doubling time (ie, the time for tumor volume to double with the value of the same quantity based on tomographic imaging data has been observed. A theoretical exploration suggests that a rough but still quite informative value of the doubling time may be calculated based on a homogeneous brain model. The model could serve as the main component of a continuous mathematics-based glioblastoma oncosimulator aiming at supporting the clinician in the optimal patient-individualized design of treatment using the patient’s multiscale data and experimenting in silico (ie, on the computer.

  20. 42 CFR 422.760 - Determinations regarding the amount of civil money penalties and assessment imposed by CMS.

    Science.gov (United States)

    2010-10-01

    ... penalties and assessment imposed by CMS. 422.760 Section 422.760 Public Health CENTERS FOR MEDICARE... assessment imposed by CMS. (a) Determining the appropriate amount of any penalty. In determining the amount of penalty imposed under 422.752(c)(1), CMS will consider as appropriate: (1) The nature of the...

  1. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  2. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  3. Making Conditional Cash Transfer Programs More Efficient : Designing for Maximum Effect of the Conditionality

    OpenAIRE

    de Janvry, Alain; Sadoulet, Elisabeth

    2006-01-01

    Conditional cash transfer programs are now used extensively to encourage poor parents to increase investments in their children's human capital. These programs can be large and expensive, motivating a quest for greater efficiency through increased impact of the programs' imposed conditions on human capital formation. This requires designing the programs' targeting and calibration rules spe...

  4. Constraints on effective interactions imposed by antisymmetry and charge independence

    Energy Technology Data Exchange (ETDEWEB)

    Stringari, S [Trento Univ. (Italy). Dipartimento di Matematica e Fisica; Brink, D M [Oxford Univ. (UK). Dept. of Theoretical Physics

    1978-07-24

    Restrictions on the form of the energy functional following antisymmetry and charge independence have been investigated for a Hartree-Fock theory based on effective interactions. These restrictions impose severe constraints on density dependent effective interactions.

  5. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  6. 7 CFR 301.86-5 - Issuance and cancellation of certificates and limited permits.

    Science.gov (United States)

    2010-01-01

    ... prohibited from being moved interstate from the quarantined area. (ii) Nursery stock of other host crops. An... article must be moved in compliance with any additional emergency conditions the Administrator may impose... any plant, plant pest, plant product, article, or means of conveyance that is moving, or has moved...

  7. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  8. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  9. Influence of model boundary conditions on blood flow patterns in a patient specific stenotic right coronary artery.

    Science.gov (United States)

    Liu, Biyue; Zheng, Jie; Bach, Richard; Tang, Dalin

    2015-01-01

    In literature, the effect of the inflow boundary condition was investigated by examining the impact of the waveform and the shape of the spatial profile of the inlet velocity on the cardiac hemodynamics. However, not much work has been reported on comparing the effect of the different combinations of the inlet/outlet boundary conditions on the quantification of the pressure field and flow distribution patterns in stenotic right coronary arteries. Non-Newtonian models were used to simulate blood flow in a patient-specific stenotic right coronary artery and investigate the influence of different boundary conditions on the phasic variation and the spatial distribution patterns of blood flow. The 3D geometry of a diseased artery segment was reconstructed from a series of IVUS slices. Five different combinations of the inlet and the outlet boundary conditions were tested and compared. The temporal distribution patterns and the magnitudes of the velocity, the wall shear stress (WSS), the pressure, the pressure drop (PD), and the spatial gradient of wall pressure (WPG) were different when boundary conditions were imposed using different pressure/velocity combinations at inlet/outlet. The maximum velocity magnitude in a cardiac cycle at the center of the inlet from models with imposed inlet pressure conditions was about 29% lower than that from models using fully developed inlet velocity data. Due to the fact that models with imposed pressure conditions led to blunt velocity profile, the maximum wall shear stress at inlet in a cardiac cycle from models with imposed inlet pressure conditions was about 29% higher than that from models with imposed inlet velocity boundary conditions. When the inlet boundary was imposed by a velocity waveform, the models with different outlet boundary conditions resulted in different temporal distribution patterns and magnitudes of the phasic variation of pressure. On the other hand, the type of different boundary conditions imposed at the

  10. Effects of imposed monitoring and blunting strategies on emotional reactivity

    NARCIS (Netherlands)

    Muris, Peter; Jong, de Peter; Merckelbach, Harald; van Zuuren, Florence J.

    1994-01-01

    The present study examined the effects of imposed monitoring and blunting coping strategies on emotional reactivity in 40 subjects who prepared themselves for upcoming neutral and aversive slides. Besides subjective indices, electrodermal measures and eye blink startle responses were used to

  11. Distortions Imposed By Inflation on Historical-Cost Depreciation

    OpenAIRE

    Bravo-Ureta, Boris E.

    1983-01-01

    The use of historical-cost depreciation in periods of persistent inflation decreases the present value of depreciation deductions, thus understating the true economic cost of capital and increasing the real after-tax rate of return required by potential investors. Efforts to correct these problems by adopting depreciation methods that allow for artificially short recovery periods or accelerated rates do not provide an adequate solution. Distortions imposed by inflation on historical-cost depr...

  12. HANFORD SITE AIR OPERATING PERMIT SEMIANNUAL REPORT FOR THE PERIOD 07/01/2004 THRU 12/31/2004

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2005-01-19

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and September 15th each year, which are certified for truth, accuracy, and completeness by a Responsible Official. This semiannual report contains information from July 1, 2004 through December 31, 2004. Copies of semiannual reports are transmitted to the Washington State Department of Ecology (Ecology). the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the US Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, as amended in August 2002 and December 2002, identifies the following. (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5. ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period. (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2. 1.3, and 2.1, each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. Data derived from that monitoring will be reported in the Annual National Emission Standards for Hazardous Air Pollutants (NESHAP) Report (AOP, ''Standard Terms and Conditions

  13. Tributes imposed on tourists as a new-old source of local governments income

    Directory of Open Access Journals (Sweden)

    Marcin BURZEC

    2014-12-01

    Full Text Available The growth in a number of tourists and, consequently, a larger income obtained from tourism by the state led to the situation when the previously marginalized tributes imposed on tourists by local governments have assumed greater significance. Additional revenues to local units’ budgets, gained from the above-mentioned tributes, are often allotted for better infrastructure and tourist promotion, thereby contributing to the increased tourist competitiveness. The present paper discusses the construction of levies imposed on tourists by local governments in various European states. Besides, the issues of how local governments can influence the construction of the tax within the frames of the granted tax autonomy are examined. Due to the fact that in many European countries burdens imposed on tourists by local units can be called taxes, fees or other levies, the term „tribute”, as a broader one including all statutory charges, is intentionally used in the present paper.

  14. INVESTIGATION OF MATERIAL RESISTANCE TO PLASTIC DEFORMATION AT PROCESSING METALS BY PRESSURE WITH IMPOSING ULTRASONIC OSCILLATIONS

    Directory of Open Access Journals (Sweden)

    V. V. Klubovich

    2007-01-01

    Full Text Available The paper contains substantiation for application of experimental technique in order to investigate material resistance to plastic deformation at processing metals by pressure with imposing ultrasonic oscillations while proceeding from laws of similarity. It is shown that at modeling any metal processing by pressure with imposing ultrasonic oscillations it is possible to consider that actual elastic and plastic metal properties remain constant during processing under ultrasound action. The second aspect that requires a special attention at modeling is pulse or vibration-shock deformation at processing metals by pressure with imposing ultrasonic oscillations.

  15. Identification during imposed change: the roles of personal values, type of change, and anxiety.

    Science.gov (United States)

    Sverdlik, Noga; Oreg, Shaul

    2015-06-01

    Using a person-situation perspective, we explain what happens to individuals' identification with a collective in the context of a change. We propose that given the anxiety that often emerges during change, individuals' personal values (conservation and openness to change) interact with type of change (imposed vs. voluntary) in predicting identification following change. In a pilot, longitudinal field study (N = 61, 67% female) of an imposed university campus relocation, we measured employees' values and identification with the university before and several months after the relocation. In two lab experiments (Study 1: N = 104, 91.3% female; Study 2: N = 113, 75.2% female), we manipulated a change to be either imposed or voluntary and compared the relationships between values and identification across types of change. In Study 2, we also measured anxiety from the change. When change was imposed (all three studies), but not when voluntary (Studies 1 and 2), individuals' conservation was positively, and openness negatively, related to individuals' post-change identification. The effects emerged only for individuals who experienced change-related anxiety (Study 2). Our findings demonstrate that individuals' identification with a changing collective depends on the amount of anxiety change elicits and on the particular combination of their values and type of change. © 2014 Wiley Periodicals, Inc.

  16. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  17. Reaction kinetics of hydrazine neutralization in steam generator wet lay-up solution: Identifying optimal degradation conditions

    International Nuclear Information System (INIS)

    Schildermans, Kim; Lecocq, Raphael; Girasa, Emmanuel

    2012-09-01

    During a nuclear power plant outage, hydrazine is used as an oxygen scavenger in the steam generator lay-up solution. However, due to the carcinogenic effects of hydrazine, more stringent discharge limits are or will be imposed in the environmental permits. Hydrazine discharge could even be prohibited. Consequently, hydrazine alternatives or hydrazine degradation before discharge is needed. This paper presents the laboratory tests performed to characterize the reaction kinetics of hydrazine neutralization using bleach or hydrogen peroxide, catalyzed with either copper sulfate (CuSO 4 ) or potassium permanganate (KMnO 4 ). The tests are performed on two standard steam generator lay-up solutions based on different pH control agents: ammonia or ethanolamine. Different neutralization conditions are tested by varying temperature, oxidant addition, and catalyst concentration, among others, in order to identify the optimal parameters for hydrazine neutralization in a steam generator wet lay-up solution. (authors)

  18. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  19. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  20. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  1. Repulsive Casimir force from fractional Neumann boundary conditions

    International Nuclear Information System (INIS)

    Lim, S.C.; Teo, L.P.

    2009-01-01

    This Letter studies the finite temperature Casimir force acting on a rectangular piston associated with a massless fractional Klein-Gordon field at finite temperature. Dirichlet boundary conditions are imposed on the walls of a d-dimensional rectangular cavity, and a fractional Neumann condition is imposed on the piston that moves freely inside the cavity. The fractional Neumann condition gives an interpolation between the Dirichlet and Neumann conditions, where the Casimir force is known to be always attractive and always repulsive respectively. For the fractional Neumann boundary condition, the attractive or repulsive nature of the Casimir force is governed by the fractional order which takes values from zero (Dirichlet) to one (Neumann). When the fractional order is larger than 1/2, the Casimir force is always repulsive. For some fractional orders that are less than but close to 1/2, it is shown that the Casimir force can be either attractive or repulsive depending on the aspect ratio of the cavity and the temperature.

  2. Hanford Site Air Operating Permit Semiannual Report for the period July 21 2001 Thru December 31 2001

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2002-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and August 15th each year, which are certified for truth and accuracy by a Responsible Official. This first semiannual report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the March 15th semiannual report will contain information for the period from July 1 through December 31. The semiannual report submitted by August 15th will contain information for the period from January 1 through June 30. Copies of the semiannual reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, identifies the following: (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5, ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring that were submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2, 1.3 and 2.1. each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. The data derived from that monitoring will be reported

  3. Hanford Site Air Operating Permit Semiannual Report for the period July 21 2001 Thru December 31 2001

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2002-02-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and August 15th each year, which are certified for truth and accuracy by a Responsible Official. This first semiannual report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the March 15th semiannual report will contain information for the period from July 1 through December 31. The semiannual report submitted by August 15th will contain information for the period from January 1 through June 30. Copies of the semiannual reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, identifies the following: (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5, ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring that were submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2, 1.3 and 2.1. each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting

  4. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  5. 77 FR 31302 - Review of Federal Permit Conditions

    Science.gov (United States)

    2012-05-25

    .... Intention To Work With Other Agencies It is the Federal Coordinator's intention to work closely with other... conditions early and either avoid a formal review process or conclude it expeditiously. B. Definitions (1..., right-of-way or other authorization. It was the Office of the Federal Coordinator's intention to include...

  6. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  7. 36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...

  8. Cracking in reinforced concrete structures due to imposed deformations

    Energy Technology Data Exchange (ETDEWEB)

    Nagy, A.

    1997-04-01

    This thesis is concerned with modeling of the cracking process in reinforced concrete due to imposed deformations. Cracking is investigated both at early ages, during hydration, and at mature age when the final properties of the concrete are reached. One of the most important material characteristics of the concrete at early ages, the Young`s modulus is determined by means of a dynamic method called the resonance frequency method. 40 refs

  9. Imposing limits on autonomous systems.

    Science.gov (United States)

    Hancock, P A

    2017-02-01

    Our present era is witnessing the genesis of a sea-change in the way that advanced technologies operate. Amongst this burgeoning wave of untrammelled automation there is now beginning to arise a cadre of ever-more independent, autonomous systems. The degree of interaction between these latter systems with any form of human controller is becoming progressively more diminished and remote; and this perhaps necessarily so. Here, I advocate for human-centred and human favouring constraints to be designed, programmed, promulgated and imposed upon these nascent forms of independent entity. I am not sanguine about the collective response of modern society to this call. Nevertheless, the warning must be voiced and the issue debated, especially among those who most look to mediate between people and technology. Practitioner Summary: Practitioners are witnessing the penetration of progressively more independent technical orthotics into virtually all systems' operations. This work enjoins them to advocate for sentient, rational and mindful human-centred approaches towards such innovations. Practitioners need to place user-centred concerns above either the technical or the financial imperatives which motivate this line of progress.

  10. 28 CFR 522.13 - Relationship between existing civil contempt commitment orders and new criminal sentences imposed...

    Science.gov (United States)

    2010-07-01

    ... contempt commitment orders and new criminal sentences imposed under the U.S. or D.C. Code. 522.13 Section..., CLASSIFICATION, AND TRANSFER ADMISSION TO INSTITUTION Civil Contempt of Court Commitments § 522.13 Relationship between existing civil contempt commitment orders and new criminal sentences imposed under the U.S. or D.C...

  11. Pure culture response of ectomycorrhizal fungi to imposed water stress

    Science.gov (United States)

    Mark D. Coleman; Caroline S. Bledsoe; William Lopushinsky

    1989-01-01

    The ability of ectomycorrhizal fungal isolates to tolerate imposed water stress in pure culture was examined in 55 isolates of 18 species. Water potential treatments, adjusted with polyethylene glycol, were applied to Petri dish units. These units allowed colony diameter measurements of fungi grown on liquid media. Delayed growth initiation and inhibition of growth...

  12. G.M. counter and pre-determined dead time; Compteur G.M. et temps mort impose

    Energy Technology Data Exchange (ETDEWEB)

    Lamotte, R; Le Baud, P [Commissariat a l' Energie Atomique, Saclay (France).Centre d' Etudes Nucleaires

    1959-07-01

    This paper is divided into two main parts. - The first section recalls the principle on which a G.M. counter works, and examines the factors which lead to inaccuracies in counting. The concept of dead time, although simple risen associated with the counter alone, becomes complicated as soon as an electronic dead time is introduced to meet the demands of a measurement or an experiment. The resulting dead time, due to the coexistence of these dead times created by a single motivating factor, shows up as a function of certain laws of probability. From the analysis of the various cases of possible combinations, the conditions which must be fulfilled by a system with pre-determined dead time may be determined. This leads to a method for measuring the dead time of a G.M. counter, and the possibility of studying the latter under the utilisation conditions foreseen. - In the second part the principle, construction and characteristics of two systems with pre-determined dead time are discussed. To conclude, a comparison of several experimental results justifies an extension of the possibilities of a G.M. counter used in conjunction with such a system. (author) [French] Deux parties essentielles scindent cet expose. - La premiere partie rappelle le principe de fonctionnement d'un compteur G.M. et examine les facteurs d'imprecisions affectant les comptages. La notion de temps mort, simple quand elle est associee au compteur seul, se complique des qu'intervient un temps mort electronique introduit pour les besoins d'une mesure ou d'une experience. Le temps mort resultant, du a la coexistence de ces temps morts engendres par une meme cause, se manifeste en fonction de certaines lois de probabilites. L'analyse des differents cas de combinaisons possibles permet de preciser les imperatifs auxquels doit repondre un systeme a temps mort impose. Il en decoule une methode de mesure du temps mort d'un compteur G.M. et la possibilite d'etudier celui-ci dans les conditions d

  13. Self-imposed length limits in recreational fisheries

    Science.gov (United States)

    Chizinski, Christopher J.; Martin, Dustin R.; Hurley, Keith L.; Pope, Kevin L.

    2014-01-01

    A primary motivating factor on the decision to harvest a fish among consumptive-orientated anglers is the size of the fish. There is likely a cost-benefit trade-off for harvest of individual fish that is size and species dependent, which should produce a logistic-type response of fish fate (release or harvest) as a function of fish size and species. We define the self-imposed length limit as the length at which a captured fish had a 50% probability of being harvested, which was selected because it marks the length of the fish where the probability of harvest becomes greater than the probability of release. We assessed the influences of fish size, catch per unit effort, size distribution of caught fish, and creel limit on the self-imposed length limits for bluegill Lepomis macrochirus, channel catfish Ictalurus punctatus, black crappie Pomoxis nigromaculatus and white crappie Pomoxis annularis combined, white bass Morone chrysops, and yellow perch Perca flavescens at six lakes in Nebraska, USA. As we predicted, the probability of harvest increased with increasing size for all species harvested, which supported the concept of a size-dependent trade-off in costs and benefits of harvesting individual fish. It was also clear that probability of harvest was not simply defined by fish length, but rather was likely influenced to various degrees by interactions between species, catch rate, size distribution, creel-limit regulation and fish size. A greater understanding of harvest decisions within the context of perceived likelihood that a creel limit will be realized by a given angler party, which is a function of fish availability, harvest regulation and angler skill and orientation, is needed to predict the influence that anglers have on fish communities and to allow managers to sustainable manage exploited fish populations in recreational fisheries.

  14. 25 CFR 170.916 - May tribes impose taxes or fees on those performing IRR Program services?

    Science.gov (United States)

    2010-04-01

    ... Indian Preference § 170.916 May tribes impose taxes or fees on those performing IRR Program services? Yes... 25 Indians 1 2010-04-01 2010-04-01 false May tribes impose taxes or fees on those performing IRR Program services? 170.916 Section 170.916 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  15. Self-interest without selfishness: the hedonic benefit of imposed self-interest.

    Science.gov (United States)

    Berman, Jonathan Z; Small, Deborah A

    2012-10-01

    Despite commonsense appeal, the link between self-interest and happiness remains elusive. One reason why individuals may not feel satisfied with self-interest is that they feel uneasy about sacrificing the needs of others for their own gain. We propose that externally imposing self-interest allows individuals to enjoy self-benefiting outcomes that are untainted by self-reproach for failing to help others. Study 1 demonstrated that an imposed self-interested option (a reward) leads to greater happiness than does choosing between a self-interested option and a prosocial option (a charity donation). Study 2 demonstrated that this effect is not driven by choice in general; rather, it is the specific trade-off between benefiting the self and benefiting others that inhibits happiness gained from self-interest. We theorize that the agency inherent in choice reduces the hedonic value of self-interest. Results of Study 3 find support for this mechanism.

  16. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  17. 24 CFR 266.120 - Actions for which sanctions may be imposed.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Housing Finance Agency Requirements § 266.120 Actions for which sanctions may be imposed. Results of... provisions with respect to individual projects; (12) Maintain a default ratio acceptable to HUD relative to...

  18. 30 CFR 773.19 - Permit issuance and right of renewal.

    Science.gov (United States)

    2010-07-01

    ... each party to an informal conference. (2) The local governmental officials in the local political subdivision in which the land to be affected is located within 10 days after the issuance of a permit... economic loss to the permittee; or (ii) There are conditions beyond the control and without the fault or...

  19. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  20. Is imposing risk awareness cultural imperialism?

    Science.gov (United States)

    Førde, O H

    1998-11-01

    Epidemiology is the main supplier of "bases of action" for preventive medicine and health promotion. Epidemiology and epidemiologists therefore have a responsibility not only for the quality and soundness of the risk estimates they deliver and for the way they are interpreted and used, but also for their consequences. In the industrialised world, the value of, and fascination with health is greater than ever, and the revelation from epidemiological research of new hazards and risks, conveyed to the public by the media, has become almost an every-day phenomenon. This "risk epidemic" in the modern media is paralleled in professional medical journals. It is in general endorsed by health promoters as a necessary foundation for increased health awareness and a desirable impetus for people to take responsibility for their own health through behavioural changes. Epidemiologists and health promoters, however, have in general not taken the possible side effects of increased risk awareness seriously enough. By increasing anxiety regarding disease, accidents and other adverse events, the risk epidemic enhances both health care dependence and health care consumption. More profoundly, and perhaps even more seriously, it changes the way people think about health, disease and death--and ultimately and at least potentially, their perspective on life more generally. The message from the odds ratios from epidemiological research advocates a rationalistic, individualistic, prospective life perspective where maximising control and minimising uncertainty is seen as a superior goal. The inconsistency between applying an expanded health concept, comprising elements of coping, self-realisation and psycho-physical functioning, and imposing intolerance to risk and uncertainty, is regularly overlooked. Acceptance and tolerance of risk and uncertainty, which are inherent elements of human life, is a prerequisite for coping and self-realisation. A further shift away from traditional working

  1. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  2. 10 CFR 725.23 - Terms and conditions of access.

    Science.gov (United States)

    2010-01-01

    ... warranty or other representation, expressed or implied, (1) with respect to the accuracy, completeness or... 10 Energy 4 2010-01-01 2010-01-01 false Terms and conditions of access. 725.23 Section 725.23 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.23 Terms and conditions...

  3. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  4. Compositeness condition in the renormalization group equation

    International Nuclear Information System (INIS)

    Bando, Masako; Kugo, Taichiro; Maekawa, Nobuhiro; Sasakura, Naoki; Watabiki, Yoshiyuki; Suehiro, Kazuhiko

    1990-01-01

    The problems in imposing compositeness conditions as boundary conditions in renormalization group equations are discussed. It is pointed out that one has to use the renormalization group equation directly in cutoff theory. In some cases, however, it can be approximated by the renormalization group equation in continuum theory if the mass dependent renormalization scheme is adopted. (orig.)

  5. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  6. Arthropod Borne Diseases in Imposed War during 1980-88

    Directory of Open Access Journals (Sweden)

    M Khoobdel

    2008-06-01

    Full Text Available Background: Personnel of military forces have close contact with natural habitat and usually encounter with bite of arthropods and prone to be infected with arthropod borne diseases. The imposed war against Iran was one of the most important and the longest war in the Middle East and even in the world and military people faced various diseases. The aim of this study was to review prevalence of arthropod borne diseases and to collect relevant information and valuable experiences during the imposed war.Methods: The present survey is a historical research and cross-sectional study, focused on arthropod fauna, situation of different arthropod borne diseases and also the ways which military personnel used to protect themselves against them. The information was adopted from valid military health files and also interviewing people who participated in the war.Results: Scabies, cutaneous leishmaniasis, sandfly fever and pediculosis were more prevalent among other arthropod -borne diseases in Iran-Iraq war. Measures to control arthropods and diseases at wartime mainly included: scheduled spraying of pesticides, leishmanization and treatment of patients.Conclusion: Although measures used during the war to control arthropods were proper, however, due to needs and importance of military forces to new equipment and technologies, it is recommended to use deltamethrin-impreg­nated bed net, permethrin treated military uniforms and various insect repellents in future.

  7. Arthropod Borne Diseases in Imposed War during 1980-88

    Directory of Open Access Journals (Sweden)

    M Khoobdel

    2008-08-01

    Full Text Available Background: Personnel of military forces have close contact with natural habitat and usually encounter with bite of arthropods and prone to be infected with arthropod borne diseases. The imposed war against Iran was one of the most important and the longest war in the Middle East and even in the world and military people faced various diseases. The aim of this study was to review prevalence of arthropod borne diseases and to collect relevant information and valuable experiences during the imposed war. Methods: The present survey is a historical research and cross-sectional study, focused on arthropod fauna, situation of different arthropod borne diseases and also the ways which military personnel used to protect themselves against them. The information was adopted from valid military health files and also interviewing people who participated in the war. Results: Scabies, cutaneous leishmaniasis, sandfly fever and pediculosis were more prevalent among other arthropod -borne diseases in Iran-Iraq war. Measures to control arthropods and diseases at wartime mainly included: scheduled spraying of pesticides, leishmanization and treatment of patients. Conclusion: Although measures used during the war to control arthropods were proper, however, due to needs and importance of military forces to new equipment and technologies, it is recommended to use deltamethrin-impreg­nated bed net, permethrin treated military uniforms and various insect repellents in future.

  8. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  9. 28 CFR 29.6 - Limited participation by states and localities permitted.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Limited participation by states and localities permitted. 29.6 Section 29.6 Judicial Administration DEPARTMENT OF JUSTICE MOTOR VEHICLE THEFT... locality need not authorize the stopping of motor vehicles under all sets of conditions specified under the...

  10. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  11. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  12. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  13. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  14. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  15. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  16. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  17. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  18. 40 CFR 122.41 - Conditions applicable to all permits (applicable to State programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... disposal in violation of this permit which has a reasonable likelihood of adversely affecting human health... noncompliance which may endanger health or the environment. Any information shall be provided orally within 24... not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable...

  19. Adolescent Drug Use and the Deterrent Effect of School-Imposed Penalties

    Science.gov (United States)

    Waddell, G. R.

    2012-01-01

    Estimates of the effect of school-imposed penalties for drug use on a student's consumption of marijuana are biased if both are determined by unobservable school or individual attributes. Reverse causality is also a potential challenge to retrieving estimates of the causal relationship, as the severity of school sanctions may simply reflect the…

  20. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  1. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  2. The Seated Inactivity Trial (SIT): Physical Activity and Dietary Outcomes Associated With 8 Weeks of Imposed Sedentary Time.

    Science.gov (United States)

    Cull, Brooke J; Haub, Mark D; Rosenkranz, Richard R; Lawler, Thomas; Rosenkranz, Sara K

    2016-03-01

    Sedentary time is an independent risk factor for chronic diseases and mortality. It is unknown whether active adults alter their dietary and/or physical activity behaviors in response to imposed sedentary time, possibly modifying risk. The aim of this study was to determine whether imposed sedentary time would alter typical behaviors of active adults. Sixteen physically active, young adults were randomized to the no-intervention control (CON, n = 8) group or the sedentary-intervention (SIT, n = 8) group. SIT participants attended monitored sedentary sessions (8 wk, 10 h/wk). Assessments including diet and physical activity occurred at baseline, week 4, and week 9. There were no differences (P > .05) between CON and SIT groups for step counts or time spent in sedentary, light, moderate, or vigorous physical activity when comparing a week during imposed sedentary time (week 4) to baseline and week 9. At week 4, caloric intake was not different from baseline (P > .05) in either group. Caloric intake decreased significantly (P > .05) in SIT from baseline to week 9. Active adults did not alter physical activity or dietary behaviors during the imposed sedentary intervention. However, SIT reduced caloric intake from baseline to week 9, indicating a possible compensatory response to imposed sitting in active adults.

  3. 14 CFR 375.19 - Nature of privilege conferred.

    Science.gov (United States)

    2010-01-01

    ... international undertakings of the United States in the Chicago Convention, in particular Article 5. That article... the right of the State where such embarkation or discharge takes place to impose such regulations... Department to permit such operations only where conditions of reciprocity and the interest of the public in...

  4. The influence of an interfacial heat release on nonlinear convective regimes under the action of an imposed temperature gradient

    Energy Technology Data Exchange (ETDEWEB)

    Simanovskii, Ilya B, E-mail: cesima@tx.technion.ac.il [Department of Mathematics, Technion—Israel Institute of Technology, 32000 Haifa (Israel)

    2016-12-15

    The influence of an interfacial heat release on nonlinear convective regimes, developed under the action of an imposed temperature gradient in the 47v2 silicone oil–water system, has been studied. Two types of boundary conditions—periodic boundary conditions and rigid heat-insulated lateral walls—have been considered. Transitions between the flows with different spatial structures have been investigated. It is shown that the presence of an interfacial heat release can change the sequence of bifurcations and can lead to the appearance of new oscillatory regimes. The period-three phase trajectory has been found. (paper)

  5. Environmental permits in Arab Gulf countries - local government perspective

    International Nuclear Information System (INIS)

    Kuczynski, L.

    2002-01-01

    The legacy of past environmentally careless oil and gas exploration practices is becoming more apparent as time goes by and our understanding of causes and results increase. In many petroleum producing countries and in Arab Gulf countries in particular, this understanding has resulted in greater social demand for environmental protection and responsible exploitation of limited resources. In response to this demand, governments of the Gulf Region are paying increasingly more attention to the responsible management of environmental impacts of new developments. As a result, most of them require developers to obtain environmental permits supported by a variety of environmental baseline studies, Environmental Impact Assessments and comprehensive Environmental Management Plans. These local environmental requirements are similar to those in North America and Europe, although there are some important differences on account of local environmental, historical and socioeconomic conditions. Developers, who choose to ignore them, often find their projects caught in a web of unfamiliar environmental regulations or administrative procedures that may cause costly and unnecessary delays. Based on the author's Canadian and Arab Gulf regulatory experience, this paper describes some common causes that may delay obtaining environmental permits or cause cancellation of a project, and provides ideas to assist companies in securing necessary permits and licenses. (author)

  6. Life history trade-offs imposed by dragline use in two money spiders.

    Science.gov (United States)

    Bonte, Dries; Verduyn, Lieselot; Braeckman, Bart P

    2016-01-01

    Trade-offs among life history traits are central to understanding the limits of adaptations to stress. In animals, virtually all decisions taken during life are expected to have downstream consequences. To what degree rare, but energy-demanding, decisions carry over to individual performance is rarely studied in arthropods. We used spiders as a model system to test how single investments in silk use - for dispersal or predator escape - affect individual performance. Silk produced for safe lines and as threads for ballooning is of the strongest kind and is energetically costly, especially when resources are limited. We induced dragline spinning in two species of money spider at similar quantities to that under natural conditions and tested trade-offs with lifespan and egg sac production under unlimited prey availability and a dietary restriction treatment. We demonstrate strong trade-offs between dragline spinning and survival and fecundity. Survival trade-offs were additive to those imposed by the dietary treatment, but a reduction in eggs produced after silk use was only prevalent under conditions where food was restricted during the spider's life. Because draglines are not recycled after their use for dispersal or predator escape, their spinning incurs substantial fitness costs in dispersal, especially in environments with prey limitation. Rare but energetically costly decisions related to dispersal or predator escape may thus carry over to adult performance and explain phenotypic heterogeneity in natural populations. © 2016. Published by The Company of Biologists Ltd.

  7. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  8. Comparison of Psychological and Physiological Responses to Imposed vs. Self-selected High-Intensity Interval Training.

    Science.gov (United States)

    Kellogg, Erin; Cantacessi, Cheyann; McNamer, Olivia; Holmes, Heather; von Bargen, Robert; Ramirez, Richard; Gallagher, Daren; Vargas, Stacy; Santia, Ben; Rodriguez, Karen; Astorino, Todd A

    2018-05-08

    Kellogg, E, Cantacessi, C, McNamer, O, Holmes, H, von Bargen, R, Ramirez, R, Gallagher, D, Vargas, S, Santia, B, Rodriguez, K, and Astorino, TA. Comparison of psychological and physiological responses to imposed vs. self-selected high-intensity interval training. J Strength Cond Res XX(X): 000-000, 2018-High-intensity interval training elicits similar physiological adaptations as moderate intensity continuous training (MICT). Some studies report greater enjoyment to a bout of high-intensity interval exercise (HIIE) vs. MICT, which is surprising considering that HIIE is more intense and typically imposed on the participant. This study compared physiological and perceptual responses between imposed and self-selected HIIE. Fourteen adults (age = 24 ± 3 years) unfamiliar with HIIE initially performed ramp exercise to exhaustion to measure maximal oxygen uptake (V[Combining Dot Above]O2max) followed by 2 subsequent sessions whose order was randomized. Imposed HIIE consisted of eight 60 seconds bouts at 80 percent peak power output (%PPO) separated by 60 seconds recovery at 10 %PPO. Self-selected HIIE (HIIESS) followed the same structure, but participants freely selected intensity in increments of 10 %PPO to achieve a rating of perceived exertion (RPE) ≥7. During exercise, heart rate, V[Combining Dot Above]O2, blood lactate concentration (BLa), affect (+5 to -5), and RPE were assessed. Physical Activity Enjoyment Scale was measured after exercise. Results showed higher V[Combining Dot Above]O2 (+10%, p = 0.013), BLa (p = 0.001), and RPE (p = 0.001) in HIIESS vs. HIIEIMP, and lower affect (p = 0.01), and enjoyment (87.6 ± 15.7 vs. 95.7 ± 11.7, p = 0.04). There was a significantly higher power output in self-selected vs. imposed HIIE (263.9 ± 81.4 W vs. 225.2 ± 59.6 W, p < 0.001). Data suggest that intensity mediates affective responses rather than the mode of HIIE performed by the participant.

  9. S-Denying of the Signature Conditions Expands General Relativity's Space

    Directory of Open Access Journals (Sweden)

    Rabounski D.

    2006-07-01

    Full Text Available We apply the S-denying procedure to signature conditions in a four-dimensional pseudo-Riemannian space — i. e. we change one (or even all of the conditions to be partially true and partially false. We obtain five kinds of expanded space-time for General Relativity. Kind I permits the space-time to be in collapse. Kind II permits the space-time to change its own signature. Kind III has peculiarities, linked to the third signature condition. Kind IV permits regions where the metric fully degenerates: there may be non-quantum teleportation, and a home for virtual photons. Kind V is common for kinds I, II, III, and IV.

  10. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  11. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  12. Steady state solution of the Fokker-Planck equation combined with unidirectional quasilinear diffusion under detailed balance conditions

    International Nuclear Information System (INIS)

    Hizanidis, K.

    1984-04-01

    The relativistic collisional Fokker-Planck equation combined with an externally imposed unidirectional quasilinear (rf) diffusion is solved for arbitrary values of rf diffusion coefficient under conditions of detailed balance of the staionary joint distribution involved. The detailed balance condition imposes a restriction on the functional form of the quasilinear diffusion coefficient which might be associated with the existence of a saturated spectrum of fluctuation in a quasilinearly rf-driven plasma

  13. 34 CFR 99.38 - What conditions apply to disclosure of information as permitted by State statute adopted after...

    Science.gov (United States)

    2010-07-01

    ... permitted by State statute adopted after November 19, 1974, concerning the juvenile justice system? 99.38 Section 99.38 Education Office of the Secretary, Department of Education FAMILY EDUCATIONAL RIGHTS AND PRIVACY May an Educational Agency or Institution Disclose Personally Identifiable Information From...

  14. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  15. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  16. Hanford facility dangerous waste permit application, general information portion. Revision 3

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy's contractors are identified as ''co-operators'' and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ''operator'' elsewhere in the application is not meant to conflict with the contractors' designation as co-operators but rather is based on the contractors' contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  17. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  18. On the path independence conditions for discrete-continuous demand

    DEFF Research Database (Denmark)

    Batley, Richard; Ibáñez Rivas, Juan Nicolás

    2013-01-01

    We consider the manner in which the well-established path independence conditions apply to Small and Rosen's (1981) problem of discrete-continuous demand, focussing especially upon the restricted case of discrete choice (probabilistic) demand. We note that the consumer surplus measure promoted...... by Small and Rosen, which is specific to the probabilistic demand, imposes path independence to price changes a priori. We find that path independence to income changes can further be imposed provided a numeraire good is available in the consumption set. We show that, for practical purposes, Mc...

  19. 13 CFR 127.700 - What penalties may be imposed under this part?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What penalties may be imposed under this part? 127.700 Section 127.700 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION WOMEN-OWNED SMALL BUSINESS FEDERAL CONTRACT ASSISTANCE PROCEDURES Penalties § 127.700 What penalties may...

  20. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  1. Hip fracture risk assessment: Artificial neural network outperforms conditional logistic regression in an age- and sex-matched case control study

    OpenAIRE

    Tseng, W-J; Hung, L-W; Shieh, J-S; Abbod, MF; Lin, J

    2013-01-01

    Copyright @ 2013 Tseng et al.; licensee BioMed Central Ltd. This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/2.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Background - Osteoporotic hip fractures with a significant morbidity and excess mortality among the elderly have imposed huge health and economic burdens o...

  2. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  3. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) section 270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below

  4. Einstein boundary conditions for the 3+1 Einstein equations

    International Nuclear Information System (INIS)

    Frittelli, Simonetta; Gomez, Roberto

    2003-01-01

    In the 3+1 framework of the Einstein equations for the case of a vanishing shift vector and arbitrary lapse, we calculate explicitly the four boundary equations arising from the vanishing of the projection of the Einstein tensor along the normal to the boundary surface of the initial-boundary value problem. Such conditions take the form of evolution equations along (as opposed to across) the boundary for certain components of the extrinsic curvature and for certain space derivatives of the three-metric. We argue that, in general, such boundary conditions do not follow necessarily from the evolution equations and the initial data, but need to be imposed on the boundary values of the fundamental variables. Using the Einstein-Christoffel formulation, which is strongly hyperbolic, we show how three of the boundary equations up to linear combinations should be used to prescribe the values of some incoming characteristic fields. Additionally, we show that the fourth one imposes conditions on some outgoing fields

  5. Dress-Related Responses to the Columbine Shootings: Other-Imposed and Self-Designed.

    Science.gov (United States)

    Ogle, Jennifer Paff; Eckman, Molly

    2002-01-01

    An inductive content analysis approach was used to examine 155 dress-related newspaper articles following the Columbine High School shootings in 1999. Analysis revealed two dress-related responses: (1) other-imposed regulation to protect students and deter them from expressing hatred and (2) self-designed acts of resistance for grieving. (Contains…

  6. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  7. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  8. Energy conditions in modified Gauss-Bonnet gravity

    International Nuclear Information System (INIS)

    Garcia, Nadiezhda Montelongo; Harko, Tiberiu; Lobo, Francisco S. N.; Mimoso, Jose P.

    2011-01-01

    In considering alternative higher-order gravity theories, one is liable to be motivated in pursuing models consistent and inspired by several candidates of a fundamental theory of quantum gravity. Indeed, motivations from string/M theory predict that scalar field couplings with the Gauss-Bonnet invariant, G, are important in the appearance of nonsingular early time cosmologies. In this work, we discuss the viability of an interesting alternative gravitational theory, namely, modified Gauss-Bonnet gravity or f(G) gravity. We consider specific realistic forms of f(G) analyzed in the literature that account for the late-time cosmic acceleration and that have been found to cure the finite-time future singularities present in the dark energy models. We present the general inequalities imposed by the energy conditions and use the recent estimated values of the Hubble, deceleration, jerk and snap parameters to examine the viability of the above-mentioned forms of f(G) imposed by the weak energy condition.

  9. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  10. Sample size re-assessment leading to a raised sample size does not inflate type I error rate under mild conditions.

    Science.gov (United States)

    Broberg, Per

    2013-07-19

    One major concern with adaptive designs, such as the sample size adjustable designs, has been the fear of inflating the type I error rate. In (Stat Med 23:1023-1038, 2004) it is however proven that when observations follow a normal distribution and the interim result show promise, meaning that the conditional power exceeds 50%, type I error rate is protected. This bound and the distributional assumptions may seem to impose undesirable restrictions on the use of these designs. In (Stat Med 30:3267-3284, 2011) the possibility of going below 50% is explored and a region that permits an increased sample size without inflation is defined in terms of the conditional power at the interim. A criterion which is implicit in (Stat Med 30:3267-3284, 2011) is derived by elementary methods and expressed in terms of the test statistic at the interim to simplify practical use. Mathematical and computational details concerning this criterion are exhibited. Under very general conditions the type I error rate is preserved under sample size adjustable schemes that permit a raise. The main result states that for normally distributed observations raising the sample size when the result looks promising, where the definition of promising depends on the amount of knowledge gathered so far, guarantees the protection of the type I error rate. Also, in the many situations where the test statistic approximately follows a normal law, the deviation from the main result remains negligible. This article provides details regarding the Weibull and binomial distributions and indicates how one may approach these distributions within the current setting. There is thus reason to consider such designs more often, since they offer a means of adjusting an important design feature at little or no cost in terms of error rate.

  11. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  12. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  13. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  14. 42 CFR 423.752 - Basis for imposing intermediate sanctions and civil money penalties.

    Science.gov (United States)

    2010-10-01

    ... money penalties. 423.752 Section 423.752 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... BENEFIT Intermediate Sanctions § 423.752 Basis for imposing intermediate sanctions and civil money.... (iii) Medical social work. (iv) Administrative services. (b) Suspension of enrollment and marketing. If...

  15. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  16. 76 FR 10213 - Special Conditions: Embraer Model EMB-135BJ (Legacy 650) Airplanes, Limit Engine Torque Loads for...

    Science.gov (United States)

    2011-02-24

    ... Torque Loads for Sudden Engine Stoppage AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final... torque load imposed by sudden engine-stoppage conditions. The applicable airworthiness regulations do not... incorporate novel or unusual design features involving engine size and the potential torque load imposed by...

  17. 17 CFR 270.6c-10 - Exemption for certain open-end management investment companies to impose deferred sales loads.

    Science.gov (United States)

    2010-04-01

    ... management investment companies to impose deferred sales loads. 270.6c-10 Section 270.6c-10 Commodity and... ACT OF 1940 § 270.6c-10 Exemption for certain open-end management investment companies to impose... purposes of this section: (1) Company means a registered open-end management investment company, other than...

  18. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  19. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  20. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  1. Tribal communities and coal in Northeast India: The politics of imposing and resisting mining bans

    International Nuclear Information System (INIS)

    McDuie-Ra, Duncan; Kikon, Dolly

    2016-01-01

    Bans on coal mining have been implemented in two tribal majority states in India's north-east frontier; Nagaland and Meghalaya. In Nagaland the state government imposed the ban in an attempt to capture control of coal extraction and trade, while in Meghalaya India's National Green Commission imposed the ban over concern for the environment and labour conditions. In both cases local communities have opposed the bans, and in some areas resumed mining under the authority of tribal councils and powerful civil society actors. In this paper we explore the politics of coal extraction that resulted in these bans and the response of communities and authorities. In doing so we made three main arguments that contribute to understanding of coal and communities in frontier regions where state control is partial and the legacy of armed conflict is powerful. First, in both locations the majority of the coal mining activity has been initiated and managed by members of tribal communities rather than profit-driven outsiders. Second, in contrast to other contexts in India (notably Orissa and Jharkhand) where large state or private enterprises seek to modify the law to enable coal extraction, in Nagaland and Meghalaya it has been communities that resent and challenge state and national laws being applied to their lands. Third, the right to extract coal is connected to the right of tribal communities to determine what happens on their lands. - Highlights: • Tribal communities initiate and manage coal mining in Nagaland and Meghalaya. • Laws banning coal extraction have been challenged and resisted by local communities. • The right to extract coal is tied to protecting tribal land rights. • Tribal autonomy in coal policy is progressive, yet enables capture by local elites. • Where there has been regulation of coal mining it has come from unexpected sources.

  2. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  3. 26 CFR 1.857-4 - Tax imposed by reason of the failure to meet certain source-of-income requirements.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Real Estate Investment Trusts § 1.857-4 Tax imposed by reason of the failure to meet certain source-of-income requirements. Section 857... 26 Internal Revenue 9 2010-04-01 2010-04-01 false Tax imposed by reason of the failure to meet...

  4. Damage Characterization of EBC-SiCSiC Ceramic Matrix Composites Under Imposed Thermal Gradient Testing

    Science.gov (United States)

    Appleby, Matthew P.; Morscher, Gregory N.; Zhu, Dongming

    2014-01-01

    Due to their high temperature capabilities, Ceramic Matrix Composite (CMC) components are being developed for use in hot-section aerospace engine applications. Harsh engine environments have led to the development of Environmental Barrier Coatings (EBCs) for silicon-based CMCs to further increase thermal and environmental capabilities. This study aims at understanding the damage mechanisms associated with these materials under simulated operating conditions. A high heat-flux laser testing rig capable of imposing large through-thickness thermal gradients by means of controlled laser beam heating and back-side air cooling is used. Tests are performed on uncoated composites, as well as CMC substrates that have been coated with state-of-the-art ceramic EBC systems. Results show that the use of the EBCs may help increase temperature capability and creep resistance by reducing the effects of stressed oxidation and environmental degradation. Also, the ability of electrical resistance (ER) and acoustic emission (AE) measurements to monitor material condition and damage state during high temperature testing is shown; suggesting their usefulness as a valuable health monitoring technique. Micromechanics models are used to describe the localized stress state of the composite system, which is utilized along with ER modeling concepts to develop an electromechanical model capable of characterizing material behavior.

  5. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... special permit Lincoln, NE. to authorize an alternative fire protection system. 11624-M Clean Harbors 49... Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special Permit Applications. SUMMARY: In accordance with the procedures...

  6. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  7. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  8. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  9. 9 CFR 95.12 - Bones, horns, and hoofs; importations permitted subject to restrictions.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Bones, horns, and hoofs; importations... ENTRY INTO THE UNITED STATES § 95.12 Bones, horns, and hoofs; importations permitted subject to restrictions. Bones, horns, and hoofs offered for importation which do not meet the conditions or requirements...

  10. Adaptation of the tourism in Romania to the new economic context imposed by the global economic crisis (in 2010

    Directory of Open Access Journals (Sweden)

    Silvia IFTIME

    2013-01-01

    Full Text Available The global economic crisis affected the tourist market from Romania since 2008. 2010 was for the Romanian tourism enterprises the year of successful attempts to respond to the economic and social stimuli imposed by the economic crisis. The way in which they managed to cope with the crisis shows that solutions are available to those who adapt to the conditions of fierce competition.The global economic crisis rippled its effects in all areas of activity, tourism included. Some field entrepreneurs consider that tourism will be the most affected sector of services by this crisis because the consumers will leave it at the bottom of the basket of consumption goods and services.

  11. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  12. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  13. Guidance for writing permits for the use or disposal of sewage sludge. Draft report

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Section 405(d) of the Clean Water Act (CWA) directs the U.S. Environmental Protection Agency (EPA) to develop regulations containing guidelines for the use and disposal of sewage sludge. On February 19th, 1993, EPA published final regulations at 40 Code of Federal Regulations (CFR) Part 503 as the culmination of a major effort to develop technical standards in response to Section 405(d). These regulations govern three sewage sludge use and disposal practices: land application, surface disposal, and incineration. A key element in EPA's implementation of the Part 503 regulations is educating Agency and State personnel about these new requirements. Although the regulations are generally directly enforceable against all persons involved in the use and disposal of sewage sludge, they will also be implemented through permits issued to treatment works treating domestic sewage as defined in 40 CFR 122.22. Thus, the primary focus of the manual is to assist permit writers in incorporating the Part 503 requirements into permits; it serves as an update to the Guidance for Writing Case-by-Case Permit Conditions for Municipal Sewage Sludge (PB91-145508/HDM).

  14. Can tutoring improve performance on a reasoning task under deadline conditions?

    Science.gov (United States)

    Osman, Magda

    2007-03-01

    The present study examined the effectiveness of a tutoring technique that has been used to identify and address participants' misunderstandings in Wason's selection task. In particular, the study investigated whether the technique would lead to improvements in performance when the task was presented in a deadline format (a condition in which time restrictions are imposed). In Experiment 1, the effects of tutoring on performance were compared in free time (conditions in which no time restrictions are imposed) and deadline task formats. In Experiment 2, improvements in performance were studied in deadline task formats, in which the tutoring and test phases were separated by an interval of 1 day. The results suggested that tutoring improved performance on the selection task under deadline and in free time conditions. Additionally, the study showed that participants made errors because they had misinterpreted the task. With tutoring, they were able to modify their initial misunderstandings.

  15. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    Energy Technology Data Exchange (ETDEWEB)

    Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  16. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  17. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  18. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  19. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  20. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  1. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  2. 42 CFR 422.756 - Procedures for imposing intermediate sanctions and civil money penalties.

    Science.gov (United States)

    2010-10-01

    ... civil money penalties. 422.756 Section 422.756 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... Sanctions § 422.756 Procedures for imposing intermediate sanctions and civil money penalties. (a) Notice of... money penalties—(1) CMS notice to OIG. If CMS determines that an MA organization has failed to comply...

  3. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  4. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  5. 50 CFR 22.23 - What are the requirements for permits to take depredating eagles and eagles that pose a risk to...

    Science.gov (United States)

    2010-10-01

    ... the following conditions: (1) Bald or golden eagles may be taken under permit by firearms, traps, or other suitable means except by poison or from aircraft; (2) The taking of eagles under permit may be... take bald or golden eagles unless the Director has determined that such taking is compatible with the...

  6. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  7. Age and sex differences in steadiness of elbow flexor muscles with imposed cognitive demand

    Science.gov (United States)

    Pereira, Hugo M.; Spears, Vincent C.; Schlinder-Delap, Bonnie; Yoon, Tejin; Nielson, Kristy A.; Hunter, Sandra K.

    2015-01-01

    Purpose These studies determined (1) age and sex-related differences in steadiness of isometric contractions when high cognitive demand was imposed across a range of forces with the elbow flexor muscles (study 1) and, (2) sex differences in steadiness among older adults when low cognitive demand was imposed (study 2). Methods 36 young adults (18–25 years; 18 women) and 30 older adults (60–82 years; 17 women) performed isometric contractions at 5%, 30% and 40% of maximum voluntary contraction (MVC). Study 1 involved a high-cognitive demand session (serial subtractions by 13 during the contraction) and a control session (no mental math). Study 2 (older adults only) involved a low-cognitive demand session (subtracting by 1s). Results Older individuals exhibited greater increases in force fluctuations (coefficient of variation of force, CV) with high cognitive demand than young adults, with the largest age difference at 5% MVC (P = 0.01). Older adults had greater agonist EMG activity with high-cognitive demand and women had greater coactivation than men (Pdemand for the older women but not for the older men (P = 0.03). Conclusion Older adults had reduced steadiness and increased muscle activation when high cognitive demand was imposed while low cognitive demand induced increased force fluctuations in older women but not older men. These findings have implications for daily and work-related tasks that involve cognitive demand performed simultaneously during submaximal isometric contractions in an aging workforce. PMID:25633070

  8. The role of energy conditions in f(R) cosmology

    Science.gov (United States)

    Capozziello, S.; Nojiri, S.; Odintsov, S. D.

    2018-06-01

    Energy conditions can play an important role in defining the cosmological evolution. Specifically acceleration/deceleration of cosmic fluid, as well as the emergence of Big Rip singularities, can be related to the constraints imposed by the energy conditions. Here we discuss this issue for f (R) gravity considering also conformal transformations. Cosmological solutions and equations of state can be classified according to energy conditions. The qualitative change of some energy conditions when transformation from the Jordan frame to the Einstein frame done is also observed.

  9. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  10. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  11. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...

  12. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  13. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  14. 42 CFR 422.752 - Basis for imposing intermediate sanctions and civil money penalties.

    Science.gov (United States)

    2010-10-01

    ... money penalties. 422.752 Section 422.752 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... Sanctions § 422.752 Basis for imposing intermediate sanctions and civil money penalties. (a) All... sanctions at 422.750(a)(1) and (a)(3). (c) Civil Money Penalties. (1) CMS. In addition to, or in place of...

  15. 28 CFR 522.12 - Relationship between existing criminal sentences imposed under the U.S. or D.C. Code and new...

    Science.gov (United States)

    2010-07-01

    ... sentences imposed under the U.S. or D.C. Code and new civil contempt commitment orders. 522.12 Section 522..., AND TRANSFER ADMISSION TO INSTITUTION Civil Contempt of Court Commitments § 522.12 Relationship between existing criminal sentences imposed under the U.S. or D.C. Code and new civil contempt commitment...

  16. Quantum “violation” of Dirichlet boundary condition

    Directory of Open Access Journals (Sweden)

    I.Y. Park

    2017-02-01

    Full Text Available Dirichlet boundary conditions have been widely used in general relativity. They seem at odds with the holographic property of gravity simply because a boundary configuration can be varying and dynamic instead of dying out as required by the conditions. In this work we report what should be a tension between the Dirichlet boundary conditions and quantum gravitational effects, and show that a quantum-corrected black hole solution of the 1PI action no longer obeys, in the naive manner one may expect, the Dirichlet boundary conditions imposed at the classical level. We attribute the ‘violation’ of the Dirichlet boundary conditions to a certain mechanism of the information storage on the boundary.

  17. Quantum “violation” of Dirichlet boundary condition

    Energy Technology Data Exchange (ETDEWEB)

    Park, I.Y., E-mail: inyongpark05@gmail.com

    2017-02-10

    Dirichlet boundary conditions have been widely used in general relativity. They seem at odds with the holographic property of gravity simply because a boundary configuration can be varying and dynamic instead of dying out as required by the conditions. In this work we report what should be a tension between the Dirichlet boundary conditions and quantum gravitational effects, and show that a quantum-corrected black hole solution of the 1PI action no longer obeys, in the naive manner one may expect, the Dirichlet boundary conditions imposed at the classical level. We attribute the ‘violation’ of the Dirichlet boundary conditions to a certain mechanism of the information storage on the boundary.

  18. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  19. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  20. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  1. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  2. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  3. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  4. 40 CFR 158.2174 - Experimental use permit microbial pesticides nontarget organisms and environmental fate data...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit microbial... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS... controls the target insect pest by a mechanism of infectivity; i.e., may create an epizootic condition in...

  5. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  6. CJEU rules on use of standards in imposing information duties on life insurance companies

    NARCIS (Netherlands)

    Mańko, R.

    2015-01-01

    The EU Directive applicable to life insurance sets out what kind of information insurance companies must give to policyholders. It also allows Member States to impose broader information duties, provided that the information is necessary for the policyholder to understand the contract. In its ruling

  7. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  8. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  9. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  10. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  11. OBTAINING A PERMIT-TO-FLY FOR A HALE-UAV IN BELGIUM

    Directory of Open Access Journals (Sweden)

    J. Everaerts

    2012-09-01

    aircraft would be separated from other air traffic by a "moving box" around it. By the end of August, a permit-to-fly was issued by Belgian CAA.The paper describes the application process, and highlights the issues that were raised by the ANSPs and Belgian CAA. This should be comparable to what authorities in other crowded places would impose, and hence be a good starting point for everyone trying to use UAVs for Earth Observation at altitudes above a few hundreds meters in most of the world.

  12. Relationships between climate at origin and seedling traits in eight Panafrican provenances of Vitellaria paradoxa C.F. Gaertn. under imposed drought stress

    DEFF Research Database (Denmark)

    Bayala, J.; Sanon, Z.; Bazié, P.

    2018-01-01

    The morphological responses of seedlings of eight African provenances of Vitellaria paradoxa (Shea tree or Karité) to imposed draught stress were compared under nursery experimental conditions. The potted seedlings were subjected to three different watering regimes (87 days after sowing): no water...... stress (100% of the field capacity, C), moderate water stress (75% of C) and severe water stress (50% of C). Before the application of the stress, we observed genotypical differences in the morphological variables at the scale of leaves and of above-ground parts. The six-month water stress affected...

  13. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  14. Enforcing the Courant-Friedrichs-Lewy condition in explicitly conservative local time stepping schemes

    Science.gov (United States)

    Gnedin, Nickolay Y.; Semenov, Vadim A.; Kravtsov, Andrey V.

    2018-04-01

    An optimally efficient explicit numerical scheme for solving fluid dynamics equations, or any other parabolic or hyperbolic system of partial differential equations, should allow local regions to advance in time with their own, locally constrained time steps. However, such a scheme can result in violation of the Courant-Friedrichs-Lewy (CFL) condition, which is manifestly non-local. Although the violations can be considered to be "weak" in a certain sense and the corresponding numerical solution may be stable, such calculation does not guarantee the correct propagation speed for arbitrary waves. We use an experimental fluid dynamics code that allows cubic "patches" of grid cells to step with independent, locally constrained time steps to demonstrate how the CFL condition can be enforced by imposing a constraint on the time steps of neighboring patches. We perform several numerical tests that illustrate errors introduced in the numerical solutions by weak CFL condition violations and show how strict enforcement of the CFL condition eliminates these errors. In all our tests the strict enforcement of the CFL condition does not impose a significant performance penalty.

  15. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  16. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  17. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  18. The salt tolerance of Quinoa measured under field conditions

    DEFF Research Database (Denmark)

    Razzaghi, Fatemeh; Ahmadi, Seyed Hamid; Jensen, Christian Richardt

    conditions. In this study the threshold electrical conductivity of soil saturation extract (ECe) and maximum ECe corresponding to no economic yield of quinoa (cv. Titicaca) were determined. The experimental factors were five levels of saline solution (0, 10, 20, 30 and 40 dS m-1) imposed during flowering...

  19. CERN CERTIFICATE REQUIRED FOR AN APPLICATION FOR A FRENCH RESIDENCE PERMIT ISSUED BY A PREFECTURE

    CERN Multimedia

    Relations with the Host States Service

    2001-01-01

    All non-French nationals who reside in France for more than three consecutive months or who, in the case of intermittent periods of residence, are effectively present in France for more than three months in any six-month period must obtain a residence or stay permit (titre de séjour). If members of the CERN personnel and members of their families fulfil those conditions inter alia, they normally receive a legitimation document, which is valid as a residence or stay permit, from the French Ministry of Foreign Affairs (Carte spéciale FI or AT, Carte d'assimilé à un membre de mission diplomatique). However, members of the personnel with permanent resident status (résident permanent) are not, by virtue of that status, entitled to a legitimation document and must obtain a residence permit issued by a Prefecture. For the latter purpose, with the agreement of the Prefecture de l'Ain, CERN (i.e. the Personnel Records Office, Human Resources Division, office 33/1-...

  20. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  1. 50 CFR 21.27 - Special purpose permits.

    Science.gov (United States)

    2010-10-01

    ... certification required by part 13 and makes a sufficient showing of benefit to the migratory bird resource..., salvage, otherwise acquire, transport, or possess migratory birds, their parts, nests, or eggs for any... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose...

  2. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  3. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  4. 40 CFR 74.10 - Roles-EPA and permitting authority.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Roles-EPA and permitting authority. 74... (CONTINUED) SULFUR DIOXIDE OPT-INS Permitting Procedures § 74.10 Roles—EPA and permitting authority. (a... end-of-year compliance, determining reduced utilization, approving thermal energy transfer and...

  5. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  6. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  7. 77 FR 55168 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Permits for Major...

    Science.gov (United States)

    2012-09-07

    ... Pollution Control Board or by the permittee. Actions to combine permit terms and conditions must include a... submitted by VADEQ for approval into the SIP were adopted by the State Air Pollution Control Board on June 8... prompt and appropriate measures to remedy the violations. Virginia's Voluntary Environmental Assessment...

  8. 29 CFR 2.12 - Audiovisual coverage permitted.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audiovisual coverage permitted. 2.12 Section 2.12 Labor Office of the Secretary of Labor GENERAL REGULATIONS Audiovisual Coverage of Administrative Hearings § 2.12 Audiovisual coverage permitted. The following are the types of hearings where the Department...

  9. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  10. 30 CFR 280.27 - When may MMS cancel my permit?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When may MMS cancel my permit? 280.27 Section... Part Interrupted Activities § 280.27 When may MMS cancel my permit? The RD may cancel a permit at any time. (a) If we cancel your permit, the RD will advise you by certified or registered mail 30 days...

  11. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  12. Development of stress boundary conditions in smoothed particle hydrodynamics (SPH) for the modeling of solids deformation

    Science.gov (United States)

    Douillet-Grellier, Thomas; Pramanik, Ranjan; Pan, Kai; Albaiz, Abdulaziz; Jones, Bruce D.; Williams, John R.

    2017-10-01

    This paper develops a method for imposing stress boundary conditions in smoothed particle hydrodynamics (SPH) with and without the need for dummy particles. SPH has been used for simulating phenomena in a number of fields, such as astrophysics and fluid mechanics. More recently, the method has gained traction as a technique for simulation of deformation and fracture in solids, where the meshless property of SPH can be leveraged to represent arbitrary crack paths. Despite this interest, application of boundary conditions within the SPH framework is typically limited to imposed velocity or displacement using fictitious dummy particles to compensate for the lack of particles beyond the boundary interface. While this is enough for a large variety of problems, especially in the case of fluid flow, for problems in solid mechanics there is a clear need to impose stresses upon boundaries. In addition to this, the use of dummy particles to impose a boundary condition is not always suitable or even feasibly, especially for those problems which include internal boundaries. In order to overcome these difficulties, this paper first presents an improved method for applying stress boundary conditions in SPH with dummy particles. This is then followed by a proposal of a formulation which does not require dummy particles. These techniques are then validated against analytical solutions to two common problems in rock mechanics, the Brazilian test and the penny-shaped crack problem both in 2D and 3D. This study highlights the fact that SPH offers a good level of accuracy to solve these problems and that results are reliable. This validation work serves as a foundation for addressing more complex problems involving plasticity and fracture propagation.

  13. 76 FR 74690 - Extension of Import Restrictions Imposed on Archaeological and Ethnological Material From Bolivia

    Science.gov (United States)

    2011-12-01

    ... and Ethnological Material From Bolivia AGENCY: U.S. Customs and Border Protection; Department of... archaeological and ethnological material from Bolivia. The restrictions, which were originally imposed by... archaeological and ethnological material from Bolivia to which the restrictions apply. DATES: Effective Date...

  14. Development of procedures for calculating stiffness and damping of elastomers in engineering applications, part 6

    Science.gov (United States)

    Rieger, A.; Burgess, G.; Zorzi, E.

    1980-01-01

    An elastomer damper was designed, tested, and compared with the performance of a hydraulic damper for a power transmission shaft. The six button Viton-70 damper was designed so that the elastomer damper or the hydraulic damper could be activated without upsetting the imbalance condition of the assembly. This permitted a direct comparison of damper effectiveness. The elastomer damper consistently performed better than the hydraulic mount and permitted stable operation of the power transmission shaft to speeds higher than obtained with the squeeze film damper. Tests were performed on shear specimens of Viton-79, Buna-N, EPDM, and Neoprene to determine performance limitations imposed by strain, temperature, and frequency. Frequencies of between 110 Hz and 1100 Hz were surveyed with imposed strains between 0.0005 and 0.08 at temperatures of 32 C, 66 C, and 80 C. A set of design curves was generated in a unified format for each of the elastomer materials.

  15. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  16. Simulation of flow and habitat conditions under ice, Cache la Poudre River - January 2006

    Science.gov (United States)

    Waddle, Terry

    2007-01-01

    The U.S. Forest Service authorizes the occupancy and use of Forest Service lands by various projects, including water storage facilities, under the Federal Land Policy and Management Act. Federal Land Policy and Management Act permits can be renewed at the end of their term. The U.S. Forest Service analyzes the environmental effects for the initial issuance or renewal of a permit and the terms and conditions (for example, mitigations plans) contained in the permit for the facilities. The U.S. Forest Service is preparing an environmental impact statement (EIS) to determine the conditions for the occupancy and use for Long Draw Reservoir on National Forest System administered lands. The scope of the EIS includes evaluating current operations and effects to fish habitat of an ongoing winter release of 0.283 m3 /s (10 ft3 /s) from headwater reservoirs as part of a previously issued permit. The field conditions observed during this study included this release.

  17. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  18. 33 CFR 325.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... process. Whenever the district engineer becomes aware of planning for work which may require a DA permit... in the basic timing sequence used by the Corps of Engineers in processing applications for DA permits.... Upon receipt of such request, the district engineer will assure the conduct of an orderly process which...

  19. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  20. Transition to magnetorotational turbulence in Taylor–Couette flow with imposed azimuthal magnetic field

    International Nuclear Information System (INIS)

    A Guseva; Avila, M; Willis, A P; Hollerbach, R

    2015-01-01

    The magnetorotational instability (MRI) is thought to be a powerful source of turbulence and momentum transport in astrophysical accretion discs, but obtaining observational evidence of its operation is challenging. Recently, laboratory experiments of Taylor–Couette flow with externally imposed axial and azimuthal magnetic fields have revealed the kinematic and dynamic properties of the MRI close to the instability onset. While good agreement was found with linear stability analyses, little is known about the transition to turbulence and transport properties of the MRI. We here report on a numerical investigation of the MRI with an imposed azimuthal magnetic field. We show that the laminar Taylor–Couette flow becomes unstable to a wave rotating in the azimuthal direction and standing in the axial direction via a supercritical Hopf bifurcation. Subsequently, the flow features a catastrophic transition to spatio-temporal defects which is mediated by a subcritical subharmonic Hopf bifurcation. Our results are in qualitative agreement with the PROMISE experiment and dramatically extend their realizable parameter range. We find that as the Reynolds number increases defects accumulate and grow into turbulence, yet the momentum transport scales weakly. (paper)

  1. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  2. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  3. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  4. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  5. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... purpose of enhancing the species' survival. Permit No. TE-99477A Applicant: Benjamin S. Wallace, Fairfield...-99473A Applicant: Joseph D. Henry, San Diego, California The applicant requests a permit to take (capture...

  6. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2005 and... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871...

  7. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  8. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  9. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  10. 43 CFR 13.4 - Terms of permit.

    Science.gov (United States)

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  11. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  12. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  13. 77 FR 33624 - Extension of Import Restrictions Imposed on Archaeological and Ethnological Materials From Peru

    Science.gov (United States)

    2012-06-07

    ... and Ethnological Materials From Peru AGENCY: U.S. Customs and Border Protection, Department of... archaeological and ethnological material from Peru. The restrictions, which were originally imposed by Treasury... with the Republic of Peru on June 9, 1997, concerning the imposition of import restrictions on pre...

  14. Fatigue and creep-fatigue strength of 304 steel under biaxial strain conditions

    International Nuclear Information System (INIS)

    Asayama, Tai; Aoto, Kazumi; Wada, Yusaku

    1990-01-01

    A series of fatigue and creep-fatigue tests were conducted with 304 stainless steel at 550degC under a variety of biaxial strain conditions. Fatigue life under nonproportional loading conditions showed a significant life reduction compared with that of proportional loading, and this life reduction was reasonably estimated by taking into account the strain paths along which the strain history is imposed. Furthermore, a marked life reduction was shown to occur under nonproportional loading by imposing a strain hold period at a peak tensile strain. This life reduction was evaluated by the linear damage rule. It was shown to be possible to estimate the fatigue damage and the creep damage under nonproportional loading by a linear damage rule by estimating a stress relaxation behavior by Mises-type equivalent stress or Huddleston-type equivalent stress. (author)

  15. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  16. 25 CFR 166.219 - How do I acquire a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire a permit through negotiation? 166.219 Section 166.219 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.219 How do I acquire a permit through negotiation? (a) Permits may be negotiated and granted by th...

  17. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  18. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  19. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  20. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  1. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  2. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  3. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  4. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  5. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  6. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  7. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  8. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  9. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  10. 78 FR 26384 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2013-05-06

    ... E. Freemont Lake Road, Pinedale, WY 82941 The applicant requests the renewal of an existing permit... the permit you are interested in by number (e.g., Permit No. TE-106387). Email: [email protected] . Please refer to the respective permit number (e.g., Permit No. TE-106387) in the subject line of the...

  11. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  12. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...... to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices isanalysed. To analyse the connection between CO_2 permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat...

  13. 78 FR 57410 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  14. Experimental verification of the imposing principle for maximum permissible levels of multicolor laser radiation

    Directory of Open Access Journals (Sweden)

    Ivashin V.A.

    2013-12-01

    Full Text Available Aims. The study presents the results of experimental research to verify the principle overlay for maximum permissible levels (MPL of multicolor laser radiation single exposure on eyes. This principle of the independence of the effects of radiation with each wavelength (the imposing principle, was founded and generalized to a wide range of exposure conditions. Experimental verification of this approach in relation to the impact of laser radiation on tissue fundus of an eye, as shows the analysis of the literature was not carried out. Material and methods. Was used in the experimental laser generating radiation with wavelengths: Л1 =0,532 microns, A2=0,556to 0,562 microns and A3=0,619to 0,621 urn. Experiments were carried out on eyes of rabbits with evenly pigmented eye bottom. Results. At comparison of results of processing of the experimental data with the calculated data it is shown that these levels are close by their parameters. Conclusions. For the first time in the Russian Federation had been performed experimental studies on the validity of multi-colored laser radiation on the organ of vision. In view of the objective coincidence of the experimental data with the calculated data, we can conclude that the mathematical formulas work.

  15. Effects of salt stress imposed during two growth phases on cauliflower production and quality.

    Science.gov (United States)

    Giuffrida, Francesco; Cassaniti, Carla; Malvuccio, Angelo; Leonardi, Cherubino

    2017-03-01

    Cultivation of cauliflower is diffused in Mediterranean areas where water salinity results in the need to identify alternative irrigation sources or management strategies. Using saline water during two growth phases (from transplanting to visible appearance of inflorescence or from appearance of inflorescence to head harvest), the present study aimed to identify the growth period that is more suitable for irrigation with low quality water in relation to cauliflower production and quality. Salinity affected cauliflower growth mainly when imposed in the first growth phase. The growth reduction depended mainly on ion-specific effects, although slight nutrient imbalances as a result of Na + and Cl - antagonisms were observed. The use of non-saline water in the first or second growth period reduced both the osmotic and toxic effects of salinity. When salinity was applied during inflorescence growth, yield was reduced because of a restriction of water accumulation in the head. The results of the present study demonstrate the possibility of producing marketable cauliflower heads under conditions of salinity by timing the application of the best quality water during the first growth phase to improve fruit quality and during the second phase to reduce the negative effects of salinity on yield. © 2016 Society of Chemical Industry. © 2016 Society of Chemical Industry.

  16. 42 CFR 23.34 - What other conditions are imposed?

    Science.gov (United States)

    2010-10-01

    ... during normal working hours to accounts, documents, and records for the purposes of audit or evaluation... repayment and allow the Secretary or his or her designee access, during normal working hours, to those... the accounting principles identified by the Secretary in the loan agreement. (g) The borrower must...

  17. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State issuance of Phase II permits. 72.73 Section 72.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.73 State issuance of Phase II permits...

  18. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  19. 26 CFR 1.6664-3 - Ordering rules for determining the total amount of penalties imposed.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Additions to the Tax, Additional... that the taxpayers made a timely estimated tax payment of $1,500 for 1989 which they failed to claim... imposed. (a) In general. This section provides rules for determining the order in which adjustments to a...

  20. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  1. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  2. Pleistocene corals of the Florida keys: Architects of imposing reefs - Why?

    Science.gov (United States)

    Lidz, B.H.

    2006-01-01

    Five asymmetrical, discontinuous, stratigraphically successive Pleistocene reef tracts rim the windward platform margin off the Florida Keys. Built of large head corals, the reefs are imposing in relief (???30 m high by 1 km wide), as measured from seismic profiles. Well dated to marine oxygen isotope substages 5c, 5b, and 5a, corals at depth are inferred to date to the Stage 6/5 transition. The size of these reefs attests to late Pleistocene conditions that repeatedly induced vigorous and sustained coral growth. In contrast, the setting today, linked to Florida Bay and the Gulf of Mexico, is generally deemed marginal for reef accretion. Incursion onto the reef tract of waters that contain seasonally inconsistent temperature, salinity, turbidity, and nutrient content impedes coral growth. Fluctuating sea level and consequent settings controlled deposition. The primary dynamic was position of eustatic zeniths relative to regional topographic elevations. Sea level during the past 150 ka reached a maximum of ???10.6 m higher than at present ???125 ka, which gave rise to an inland coral reef (Key Largo Limestone) and ooid complex (Miami Limestone) during isotope substage 5e. These formations now form the Florida Keys and a bedrock ridge beneath The Quicksands (Gulf of Mexico). High-precision radiometric ages and depths of dated corals indicate subsequent apices remained ???15 to 9 m, respectively, below present sea level. Those peaks provided accommodation space sufficient for vertical reef growth yet exposed a broad landmass landward of the reefs for >100 ka. With time, space, lack of bay waters, and protection from the Gulf of Mexico, corals thrived in clear oceanic waters of the Gulf Stream, the only waters to reach them.

  3. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  4. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  5. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...: EA Engineering, Science, and Technology, Lewisville, Texas. Applicant requests a new permit for... atricapilla) within Texas. Permit TE-37047A Applicant: Sea World Parks and Entertainment, San Antonio, Texas...

  6. 50 CFR 216.41 - Permits for scientific research and enhancement.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Permits for scientific research and... AND IMPORTING OF MARINE MAMMALS Special Exceptions § 216.41 Permits for scientific research and enhancement. In addition to the requirements under §§ 216.33 through 216.38, permits for scientific research...

  7. The Clean-Development Mechanism, stochastic permit prices and energy investments

    International Nuclear Information System (INIS)

    Hieronymi, Philipp; Schüller, David

    2015-01-01

    We analyze the impact on energy investments stemming from different emission permit classes, by considering permits that are allocated inside the European Emission Trading Scheme and secondary Certified Emission Reduction (sCER) permits originating from the Clean Development Mechanism. One price taking firm which is subject to emission regulation has the choice to invest in gas or wind power plant. The firm faces uncertainty regarding stochastically evolving permit prices, while it receives a premium on the electricity price for wind energy. As a first step, we determine the value of the option to invest into a gas power plant over time. Then, we calculate the investment probability of a gas power investment in a range of policy scenarios. We find that allowing the usage of sCER permits in the present policy framework has a positive impact on gas power investment. Decoupling the price processes has a similar effect. If the quota of sCER permits is doubled, the decrease in the investment probability for wind power is large. We carry out sensitivity tests for different parameter values, and find that investment behavior changes significantly with differing interest rates, the wind energy premium and volatility. - Highlights: • We model the impact of two CO 2 permit classes on energy investments. • We present a real-options framework accounting for uncertainty. • Clean Development Mechanism permits have a negative influence on investment into renewable energy. • Interest rate and volatility values have a strong impact on the results

  8. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: In accordance with the requirements of the...

  9. 19 CFR 12.99 - Procedures for permitted entry.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Procedures for permitted entry. 12.99 Section 12.99 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY SPECIAL CLASSES OF MERCHANDISE Switchblade Knives § 12.99 Procedures for permitted entry...

  10. 40 CFR 60.4121 - Submission of Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Submission of Hg budget permit... Times for Coal-Fired Electric Steam Generating Units Permits § 60.4121 Submission of Hg budget permit applications. (a) Duty to apply. The Hg designated representative of any Hg Budget source required to have a...

  11. The fermion boundary condition and the THETA-angle in QED2

    International Nuclear Information System (INIS)

    Hrasko, P.

    1983-09-01

    The order parameter of the Schwinger model is calculated in the Euclidean functional integral approach. It is shown that the symmetry breaking angle THETA is intimately connected to the boundary condition imposed on the fermions. The transition to the Euclidean description involves both imaginary time and imaginary THETA. (author)

  12. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  13. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  14. Pricing emission permits in the absence of abatement

    International Nuclear Information System (INIS)

    Hintermann, Beat

    2012-01-01

    If emissions are stochastic and firms are unable to control them through abatement, the cap in a permit market may be exceeded, or not be reached. I derive a binary options pricing formula that expresses the permit price as a function of the penalty for noncompliance and the probability of an exceeded cap under the assumption of no abatement. I apply my model to the EU ETS, where the rapid introduction of the market made it difficult for firms to adjust their production technology in time for the first phase. The model fits the data well, implying that the permit price may have been driven by firms hedging against stochastic emissions.

  15. Challenges Imposed by User's Mobility in Future HetNet: Offloading and Mobility Management

    OpenAIRE

    Mahbas, Ali

    2017-01-01

    The users' mobility imposes challenges to mobility management and, the offloading process, which hinder the conventional heterogeneous networks (HetNets) in meeting the huge data traffic requirements of the future. In this thesis, a trio-connectivity (TC), which includes a control-plane (C-plane), a user-plane (U-plane) and an indication-plane (I-plane), is proposed to tackle these challenges. Especially, the I-plane is created as an indicator to help the user equipment (UE) identify and...

  16. 76 FR 74070 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2011-11-30

    ... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Dated: November 21, 2011. Lynn M. Lewis...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  17. 78 FR 9415 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-02-08

    ...). Authority: The authority for this notice is the Endangered Species Act of 1973, as amended (16 U.S.C. 1531...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  18. 76 FR 39368 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-07-06

    ... promulgating migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or other...). Background In response to public interest in the use of trained raptors to haze (scare) depredating and other...

  19. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  20. 9 CFR 73.10 - Permitted dips; substances allowed.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Permitted dips; substances allowed. 73.10 Section 73.10 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT... flowers of sulphur or sulphur flour to 100 gallons of water; or a specifically permitted proprietary brand...

  1. 29 CFR 1910.146 - Permit-required confined spaces.

    Science.gov (United States)

    2010-07-01

    ... any failure of hazard control or monitoring equipment) or event internal or external to the permit... could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and... complying with the permit space requirements that apply to all employers, each contractor who is retained to...

  2. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  3. 32 CFR 935.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ... shall be issued under other authority that is inconsistent with this part. The Commander may issue.... (b) To the extent it is not inconsistent with this part, any permit or registration issued pursuant...

  4. 50 CFR 660.707 - Permits.

    Science.gov (United States)

    2010-10-01

    ... or downloaded from the Southwest Region home page (http://swr.nmfs.noaa.gov/permits.htm) to apply for... the vessel is fishing for, taking, retaining, possessing, or landing HMS shoreward of the outer...

  5. 40 CFR 96.85 - NOX Budget opt-in permit contents.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget opt-in permit contents. 96... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Individual Unit Opt-ins § 96.85 NOX Budget opt-in permit contents. (a) Each NOX Budget opt-in permit...

  6. 40 CFR 97.85 - NOX Budget opt-in permit contents.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget opt-in permit contents. 97... (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Individual Unit Opt-ins. § 97.85 NOX Budget opt-in permit contents. (a) Each NOX Budget opt-in permit will contain all elements...

  7. Requirements for permitting a mixed waste incinerator

    International Nuclear Information System (INIS)

    Trichon, M.; Feldman, J.; Serne, J.C.

    1990-01-01

    The consideration, design, selection and operation of any incinerator depends primarily on characteristic quality (ultimate and proximate analyses) and quantity to the waste to be incinerated. In the case of burning any combination of mixed hazardous, biomedical and radioactive low level waste, specific federal and generic state environmental regulatory requirements are outlined. Combustion chamber temperature and waste residence time requirements will provide the rest of the envelope for consideration. Performance requirements must be balanced between the effects of time and temperature on destruction of the organic waste and the vaporization and possible emission of the inorganic waste components (e.g., toxic metals, radioactive inorganics) as operating conditions and emission levels will be set in state and federal regulatory permits. To this end the complete characterization of the subject waste stream must be determined if an accurate assessment of incineration effectiveness and impact are to be performed

  8. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... modify the special permit Town, South Africa. 178.277(b)(1). to increase the water capacity from 17000... prevent leakage during transportation. (mode 1). 15667-N Volga Dnepr--UNIQUE AIR 49 CFR 172.101 Column To...). NEW SPECIAL PERMIT WITHDRAWN 15494-N Johnson Controls Battery 49 CFR 173.159 To authorize the Group...

  9. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  10. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  11. 46 CFR 78.40-10 - No smoking permitted.

    Science.gov (United States)

    2010-10-01

    ... § 78.40-10 No smoking permitted. (a) The master shall have appropriate “No Smoking” signs posted and shall take all necessary precautions to prevent smoking or carrying of lighted or smoldering cigars... 46 Shipping 3 2010-10-01 2010-10-01 false No smoking permitted. 78.40-10 Section 78.40-10 Shipping...

  12. Weyl consistency conditions in non-relativistic quantum field theory

    Energy Technology Data Exchange (ETDEWEB)

    Pal, Sridip; Grinstein, Benjamín [Department of Physics, University of California,San Diego, 9500 Gilman Drive, La Jolla, CA 92093 (United States)

    2016-12-05

    Weyl consistency conditions have been used in unitary relativistic quantum field theory to impose constraints on the renormalization group flow of certain quantities. We classify the Weyl anomalies and their renormalization scheme ambiguities for generic non-relativistic theories in 2+1 dimensions with anisotropic scaling exponent z=2; the extension to other values of z are discussed as well. We give the consistency conditions among these anomalies. As an application we find several candidates for a C-theorem. We comment on possible candidates for a C-theorem in higher dimensions.

  13. 42 CFR 411.12 - Charges imposed by an immediate relative or member of the beneficiary's household.

    Science.gov (United States)

    2010-10-01

    ...) Natural or adoptive parent, child, or sibling. (3) Stepparent, stepchild, stepbrother, or stepsister. (4... if the physician who ordered or supervised the services has an excluded relationship to the... provider or supplier if the owner has an excluded relationship to the beneficiary; and (ii) Charges imposed...

  14. System and method of vehicle operating condition management

    Science.gov (United States)

    Sujan, Vivek A.; Vajapeyazula, Phani; Follen, Kenneth; Wu, An; Moffett, Barty L.

    2015-10-20

    A vehicle operating condition profile can be determined over a given route while also considering imposed constraints such as deviation from time targets, deviation from maximum governed speed limits, etc. Given current vehicle speed, engine state and transmission state, the present disclosure optimally manages the engine map and transmission to provide a recommended vehicle operating condition that optimizes fuel consumption in transitioning from one vehicle state to a target state. Exemplary embodiments provide for offline and online optimizations relative to fuel consumption. The benefit is increased freight efficiency in transporting cargo from source to destination by minimizing fuel consumption and maintaining drivability.

  15. Energy conditions and stability in general relativity

    International Nuclear Information System (INIS)

    Hall, G.S.

    1982-01-01

    The dominant energy condition in general relativity theory, which says that every observer measures a nonnegative local energy density and a nonspacelike local energy flow, is examined in connection with the types of energy-momentum tensor it permits. The condition that the energy-momentum tensor be ''stable'' in obeying the dominant energy conditions is then defined in terms of a suitable topology on the set of energy-momentum tensors on space-time and the consequences are evaluated and discussed. (author)

  16. Modeling and Computation of Transboundary Industrial Pollution with Emission Permits Trading by Stochastic Differential Game.

    Science.gov (United States)

    Chang, Shuhua; Wang, Xinyu; Wang, Zheng

    2015-01-01

    Transboundary industrial pollution requires international actions to control its formation and effects. In this paper, we present a stochastic differential game to model the transboundary industrial pollution problems with emission permits trading. More generally, the process of emission permits price is assumed to be stochastic and to follow a geometric Brownian motion (GBM). We make use of stochastic optimal control theory to derive the system of Hamilton-Jacobi-Bellman (HJB) equations satisfied by the value functions for the cooperative and the noncooperative games, respectively, and then propose a so-called fitted finite volume method to solve it. The efficiency and the usefulness of this method are illustrated by the numerical experiments. The two regions' cooperative and noncooperative optimal emission paths, which maximize the regions' discounted streams of the net revenues, together with the value functions, are obtained. Additionally, we can also obtain the threshold conditions for the two regions to decide whether they cooperate or not in different cases. The effects of parameters in the established model on the results have been also examined. All the results demonstrate that the stochastic emission permits prices can motivate the players to make more flexible strategic decisions in the games.

  17. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  18. Quantifying the CO{sub 2} permit price sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Gruell, Georg; Kiesel, Ruediger [Duisburg-Essen Univ., Essen (Germany). Inst. of Energy Trading and Financial Services

    2012-06-15

    Equilibrium models have been widely used in the literature with the aim of showing theoretical properties of emissions trading schemes. This paper applies equilibrium models to empirically study permit prices and to quantify the permit price sensitivity. In particular, we demonstrate that emission trading schemes both with and without banking are inherently prone to price jumps. (orig.)

  19. 50 CFR 697.24 - Exempted waters for Maine State American lobster permits.

    Science.gov (United States)

    2010-10-01

    ... lobster permits. 697.24 Section 697.24 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... lobster permits. A person or vessel holding a valid permit or license issued by the State of Maine that lawfully permits that person to engage in commercial fishing for American lobster may, with the approval of...

  20. Market microstructure matters when imposing a Tobin tax—Evidence from the lab☆

    Science.gov (United States)

    Kirchler, Michael; Huber, Jürgen; Kleinlercher, Daniel

    2011-01-01

    Trading in FX markets is dominated by two microstructures: exchanges with market makers and OTC-markets without market makers. Using laboratory experiments we test whether the impact of a Tobin tax is different in these two market microstructures. We find that (i) in markets without market makers an unilaterally imposed Tobin tax (i.e. a tax haven exists) increases volatility. (ii) In contrast, in markets with market makers we observe a decrease in volatility in unilaterally taxed markets. (iii) An encompassing Tobin tax has no impact on volatility in either setting. Efficiency does not vary significantly across tax regimes. PMID:22210970

  1. Market microstructure matters when imposing a Tobin tax-Evidence from the lab.

    Science.gov (United States)

    Kirchler, Michael; Huber, Jürgen; Kleinlercher, Daniel

    2011-12-01

    TRADING IN FX MARKETS IS DOMINATED BY TWO MICROSTRUCTURES: exchanges with market makers and OTC-markets without market makers. Using laboratory experiments we test whether the impact of a Tobin tax is different in these two market microstructures. We find that (i) in markets without market makers an unilaterally imposed Tobin tax (i.e. a tax haven exists) increases volatility. (ii) In contrast, in markets with market makers we observe a decrease in volatility in unilaterally taxed markets. (iii) An encompassing Tobin tax has no impact on volatility in either setting. Efficiency does not vary significantly across tax regimes.

  2. A comparison of taxes and tradable permits in national climate policy

    Energy Technology Data Exchange (ETDEWEB)

    Holtsmark, Bjart J.

    1999-11-01

    This article discusses domestic climate policy design in a country that has made a binding commitment to the Kyoto Protocol but at the same time want to limit the number of industry shutdowns that follows from the policy. It is furthermore considered how public budget constraints might affect climate policies. The similarities between an optionally designed taxation regime and a domestic tradable permit regime that is integrated into the international permit market are brought into focus. The similarities presuppose a greenhouse gas tax that fluctuates in accordance with the international permit price. It is argued that climate policy can generate double dividends but that the allocation of free permits reduces these dividends. It is concluded that some organisations promotion of systems tradable permits with distribution of permits free of charge as an alternative to carbon taxes must be understood from their effect on income distribution. 17 refs

  3. Athletes' perceptions of anti-doping sanctions: the ban from sport versus social, financial and self-imposed sanctions

    DEFF Research Database (Denmark)

    Overbye, Marie Birch; Elbe, Anne-Marie; Knudsen, Mette Lykke

    2015-01-01

    Today the main doping deterrence strategy is to ban athletes from sport if caught. This study examines whether Danish elite athletes perceive the ban as a deterrent and how they evaluate social, self-imposed and financial sanctions compared with the ban. Questionnaires were emailed to elite...... athletes from 40 sports (N = 645; response rate, 43%). Results showed that 78% of athletes regarded the ban as a deterrent. Older male athletes, however, did so to a lesser degree. Seventy-seven per cent, regardless of gender, age, sport type and previous experience of doping testing, viewed social...... sanctions as a greater deterrent than the ban. Many also considered self-imposed sanctions (54%) and financial consequences (47%) a greater deterrent. Four per cent considered neither the ban nor the presented alternatives a deterrent. The findings indicate that the ban from sport deters doping...

  4. Issues in third party attacks on SMCRA permits. [USA - Indiana

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, G.D. Jr. (Ice Miller Donadio Ryan, Indianapolis, IN (USA))

    1990-01-01

    Legal issues which have occurred in third party attacks on SMCRA (Surface Mining Control and Reclamation Act) permit, mainly in Indiana, are discussed. Problems that can occur with the interrelationship of common law nuisance/injunction actions, the permit process, enforcement proceedings and collateral estoppel from administrative agency action, as well as finality issues in the permit process as related to other provisions of SMCRA. 37 refs.

  5. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  6. 76 FR 35235 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-06-16

    ... chub (Gila intermedia), Gila topminnow (Poeciliopsis occidentalis occidentalis), humpback chub (Gila... intermedia) within Arizona. Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant...), and Gila chub (Gila intermedia) within Arizona. Permit TE-118414 Applicant: Cherokee Nation, Tahlequah...

  7. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  8. Propulsion efficiency and imposed flow fields of a copepod jump

    DEFF Research Database (Denmark)

    Jiang, H.; Kiørboe, Thomas

    2011-01-01

    Pelagic copepods jump to relocate, to attack prey and to escape predators. However, there is a price to be paid for these jumps in terms of their energy costs and the hydrodynamic signals they generate to rheotactic predators. Using observed kinematics of various types of jumps, we computed...... the imposed flow fields and associated energetics of jumps by means of computational fluid dynamics simulations by modeling the copepod as a self-propelled body. The computational fluid dynamics simulation was validated by particle image velocimetry data. The flow field generated by a repositioning jump...... the flow structure. The flow field associated with an escape jump sequence also includes two dominant vortex structures: one leading wake vortex generated as a result of the first jump and one around the body, but between these two vortex structures is an elongated, long-lasting flow trail with flow...

  9. A critical role of nucleus accumbens dopamine D1-family receptors in renewal of alcohol seeking after punishment-imposed abstinence.

    Science.gov (United States)

    Marchant, Nathan J; Kaganovsky, Konstantin

    2015-06-01

    In humans, places or contexts previously associated with alcohol use often provoke relapse during abstinence. This phenomenon is modeled in laboratory animals using the ABA renewal procedure, in which extinction training in context (B) suppresses alcohol seeking, and renewal of this seeking occurs when the animal returns to the original training context (A). However, extinction training does not adequately capture the motivation for abstinence in human alcoholics who typically self-initiate abstinence in response to the negative consequences of excessive use. We recently developed a procedure to study renewal in laboratory rats after abstinence imposed by negative consequences (footshock punishment). The mechanisms of renewal of punished alcohol seeking are largely unknown. Here, we used the D1-family receptor antagonist SCH 23390 to examine the role of nucleus accumbens (NAc) shell and core dopamine in renewal of alcohol seeking after punishment-imposed abstinence. We trained alcohol-preferring "P rats" to self-administer 20% alcohol in Context A and subsequently suppressed alcohol taking via response-contingent footshock punishment in Context B. We tested the effects of systemic, NAc shell, or NAc core injections of SCH 23390 on renewal of alcohol seeking after punishment-imposed abstinence. We found that both systemic and NAc shell and core injections of SCH 23390 decreased renewal of punished alcohol seeking. Our results demonstrate a critical role of NAc dopamine in renewal of alcohol seeking after punishment-imposed abstinence. We discuss these results in reference to the brain mechanisms of renewal of alcohol seeking after extinction versus punishment. (c) 2015 APA, all rights reserved).

  10. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  11. 21 CFR 1312.13 - Issuance of import permit.

    Science.gov (United States)

    2010-04-01

    ... drug listed in Schedule III, IV, or V if he finds: (1) That the substance is crude opium, poppy straw... shall render it void and of no effect. Permits are not transferable. Each copy of the permit shall have... the Act (21 U.S.C. 952(a)(1) or (a)(2)(A)), the importation of approved narcotic raw material (opium...

  12. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  13. The European Union's potential for strategic emissions trading through permit sales contracts

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Hagem, Cathrine

    2011-01-01

    Strategic market behavior by permit sellers will harm the European Union (EU) as it is expected to become a large net buyer of permits in a follow-up agreement to the Kyoto Protocol. In this paper, we explore how the EU could benefit from making permit trade agreements with non-EU countries. These trade agreements involve permit sales requirement, complemented by a financial transfer from the EU to the other contract party. Such agreements would enable the EU to act strategically in the permit market on behalf of its member states, although each member state is assumed to behave as a price taker in the permit market. Using a stylized numerical simulation model, we show that an appropriately designed permit trade agreement between the EU and China could significantly cut the EU's total compliance cost. This result is robust for a wide range of parameterizations of the simulation model. (author)

  14. 表現犯罪処罰規定の違憲性について : 破防法のせん動罪を中心にして

    OpenAIRE

    上林, 邦充

    1997-01-01

    The penal regulations which impose legal controls and inflict punishments on speech and writing should be presumed unconstitutional. In order that the provisions on sedition of the Anti-Subversive ActivitiesAct may be taken constitutional, the following requirements should be satisfied. (1) It should not be permitted to punish the accused by reason of mere seditial action. (2) It should be recognized that the critical conditions of actual harm may come into being concretely.

  15. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  16. 75 FR 67765 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-11-03

    ... collect leaf tissue and seeds from the following endangered plants: South Texas ambrosia (Ambrosia... transportation, at the Miller Park Zoo. Permit TE-24625A Applicant: Wendy Leonard, San Antonio, Texas. Applicant...-cheeked warbler (Dendroica chrysoparia) and black-capped vireo (Vireo atricapilla) within Texas. Permit TE...

  17. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... and recovery purposes to conduct pollination on 36 individual adult Arizona hedgehog cactus.... Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant requests an amendment to a... Aquarium, Grapevine, Texas. Permit TE-92366A Applicant: Kimley-Horn and Associates, Inc., Dallas, Texas...

  18. 40 CFR 76.9 - Permit application and compliance plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Permit application and compliance plans. 76.9 Section 76.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.9 Permit application and...

  19. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  20. 25 CFR 166.223 - Can I use a permit as collateral for a loan?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can I use a permit as collateral for a loan? 166.223... PERMITS Permit Requirements Permit (leasehold) Mortgage § 166.223 Can I use a permit as collateral for a loan? We may approve a permit containing a provision that authorizes the permittee to encumber the...

  1. 25 CFR 161.301 - What will a grazing permit contain?

    Science.gov (United States)

    2010-04-01

    ... permits will contain the following provisions: (1) Name of permit holder; (2) Range management plan...) Animal identification requirements (i.e., brand, microchip, freeze brand, earmark, tattoo, etc.); (6...

  2. 77 FR 71033 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2012-11-28

    ... Lincoln, NE. permit to authorize an alternative fire protection system. 15461-M Kidde Products High 49 CFR... Systems Inc. 49 CFR 172.200, To reissue the special Plymouth, MI. 177.834. permit originally issued on an... Applications for Modification of Special Permit AGENCY: Office of Hazardous Materials Safety, Pipeline and...

  3. Theoretical requirements to tolerances to be imposed on fuel rod design parameters for RBEC-M lead-bismuth fast reactor

    International Nuclear Information System (INIS)

    Vasiliev, A.; Alekseev, P.; Mikityuk, K.; Fomichenko, P.; Shestopalov, A.

    2002-01-01

    Development of advanced reactors with innovative materials requires comprehensive analysis of fuel rod design parameters as well as tolerances to be imposed on these parameters. Currently, it is considered traditional to estimate uncertainties in core neutronics parameters on the basis of known tolerances imposed on fuel rod design parameters. However, requirements to some core neutronics parameters of advanced reactors can be first formulated and then taken into account, while developing the technologies for innovative fuel rod manufacturing, i.e. an 'inverse' problem can be solved. The aim of this problem is to find combinations of fuel rod design tolerances which provide that selected core neutronics parameters remain within specified deviations during base irradiation. (authors)

  4. Casimir pistons with general boundary conditions

    Directory of Open Access Journals (Sweden)

    Guglielmo Fucci

    2015-02-01

    Full Text Available In this work we analyze the Casimir energy and force for a scalar field endowed with general self-adjoint boundary conditions propagating in a higher dimensional piston configuration. The piston is constructed as a direct product I×N, with I=[0,L]⊂R and N a smooth, compact Riemannian manifold with or without boundary. The study of the Casimir energy and force for this configuration is performed by employing the spectral zeta function regularization technique. The obtained analytic results depend explicitly on the spectral zeta function associated with the manifold N and the parameters describing the general boundary conditions imposed. These results are then specialized to the case in which the manifold N is a d-dimensional sphere.

  5. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Science.gov (United States)

    2010-08-06

    ... Presidential Permit No. PP-22, as amended, to BC Hydro. The application requested that the Department of Energy... the transmission of electric energy between the United States and a foreign country is prohibited in... law pursuant to British Columbia's Clean Energy Act. Since restructuring of the electric power...

  6. Effects of the conditions imposed by the environment and by utilities on the design of process engineering plant

    Energy Technology Data Exchange (ETDEWEB)

    Bernecker, G

    1976-09-01

    Conditions of environment and utilities have a great influence on the investment and operation costs of process engineering plants. If these conditions are taken into consideration in preliminary process engineering, the considerable amount of time spent in planning subsequent modifications could be saved. This publication from the seminar held with the topic 'planning and construction of process engineering systems' by the VDI-Bildungswerk shows how to facilitate problems of waste products already 'in statu nascendi'. The second part which will be published in the next edition will summarize the possibilities and the determining restrictions in the use of the available media for heating and cooling. Both essays are extended presentations of a chapter from a book in preparation by the VDI with the same title as the seminar.

  7. Classical Conditioning with Pulsed Integrated Neural Networks: Circuits and System

    DEFF Research Database (Denmark)

    Lehmann, Torsten

    1998-01-01

    In this paper we investigate on-chip learning for pulsed, integrated neural networks. We discuss the implementational problems the technology imposes on learning systems and we find that abiologically inspired approach using simple circuit structures is most likely to bring success. We develop a ...... chip to solve simple classical conditioning tasks, thus verifying the design methodologies put forward in the paper....

  8. 40 CFR 96.24 - Effective date of initial NOX Budget permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Effective date of initial NOX Budget... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Permits § 96.24 Effective date of initial NOX Budget permit. The initial NOX Budget permit...

  9. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-10-12

    ... from Helianthus paradoxus (Pecos sunflower) from plants in Texas. Permit TE-829761 Applicant: Bureau of... for endangered plant species, and 50 CFR 17.72 for threatened plant species. Applications Available...: Texas A & M University, Galveston, Texas. Applicant requests a new permit for husbandry and holding of...

  10. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  11. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  12. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  13. Joint stiffness and running economy during imposed forefoot strike before and after a long run in rearfoot strike runners.

    Science.gov (United States)

    Melcher, Daniel A; Paquette, Max R; Schilling, Brian K; Bloomer, Richard J

    2017-12-01

    Research has focused on the effects of acute strike pattern modifications on lower extremity joint stiffness and running economy (RE). Strike pattern modifications on running biomechanics have mostly been studied while runners complete short running bouts. This study examined the effects of an imposed forefoot strike (FFS) on RE and ankle and knee joint stiffness before and after a long run in habitual rearfoot strike (RFS) runners. Joint kinetics and RE were collected before and after a long run. Sagittal joint kinetics were computed from kinematic and ground reaction force data that were collected during over-ground running trials in 13 male runners. RE was measured during treadmill running. Knee flexion range of motion, knee extensor moment and ankle joint stiffness were lower while plantarflexor moment and knee joint stiffness were greater during imposed FFS compared with RFS. The long run did not influence the difference in ankle and knee joint stiffness between strike patterns. Runners were more economical during RFS than imposed FFS and RE was not influenced by the long run. These findings suggest that using a FFS pattern towards the end of a long run may not be mechanically or metabolically beneficial for well-trained male RFS runners.

  14. 45 CFR 264.72 - What requirements are imposed on a State if it receives contingency funds?

    Science.gov (United States)

    2010-10-01

    ... receives contingency funds? 264.72 Section 264.72 Public Welfare Regulations Relating to Public Welfare... Contingency Fund? § 264.72 What requirements are imposed on a State if it receives contingency funds? (a)(1) A State must meet a Contingency Fund MOE level of 100 percent of historic State expenditures for FY 1994...

  15. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  16. 25 CFR 91.7 - Permits to occupy land for dwelling purposes.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Permits to occupy land for dwelling purposes. 91.7... INDIAN VILLAGES, OSAGE RESERVATION, OKLAHOMA § 91.7 Permits to occupy land for dwelling purposes. The issuance of permits for the use of land for dwelling purposes within any village reserve described in § 91...

  17. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  18. The significance of the pilot conditioning plant (PKA) for spent fuel management

    International Nuclear Information System (INIS)

    Willax, H.O.

    1996-01-01

    The pilot conditioning plant (PKA) is intended as a multi-purpose facility and thus may serve various purposes involved in the conditioning or disposal of spent fuel elements or radwaste. Its design as a pilot plant permits development and trial of various methods and processes for fuel element conditioning, as well as for radwaste conditioning. (orig./DG) [de

  19. 75 FR 52965 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-08-30

    ... appointment only, during normal business hours at the U.S. Fish and Wildlife Service, 500 Gold Ave., SW., Room... permit for research and recovery purposes to conduct presence/absence surveys for American burying beetle...., Round Rock, Texas. Applicant requests an amendment to a current permit for research and recovery...

  20. 48 CFR 52.247-2 - Permits, Authorities, or Franchises.

    Science.gov (United States)

    2010-10-01

    ... Franchises. 52.247-2 Section 52.247-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....247-2 Permits, Authorities, or Franchises. As prescribed in 47.207-1(a), insert the following clause: Permits, Authorities, or Franchises (JAN 1997) (a) The offeror does □, does not □, hold authorization from...

  1. 36 CFR 228.54 - Single entry sales or permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Single entry sales or permits... MINERALS Disposal of Mineral Materials General Provisions § 228.54 Single entry sales or permits. The... plan which describes operating procedures and reclamation measures, unless the requirement is waived by...

  2. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  3. 78 FR 14110 - Emergency Issuance of Endangered Species Permit

    Science.gov (United States)

    2013-03-04

    ... issued an endangered species permit to address emergency veterinary care for an injured green sea turtle...] Emergency Issuance of Endangered Species Permit AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered and threatened species under section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended...

  4. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  5. 25 CFR 900.46 - What requirements are imposed upon the Secretary for financial management by these standards?

    Science.gov (United States)

    2010-04-01

    ... financial management by these standards? 900.46 Section 900.46 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT... Management Systems Standards for Financial Management Systems § 900.46 What requirements are imposed upon the Secretary for financial management by these standards? The Secretary shall establish procedures, consistent...

  6. Physical renormalization condition for de Sitter QED

    Science.gov (United States)

    Hayashinaka, Takahiro; Xue, She-Sheng

    2018-05-01

    We considered a new renormalization condition for the vacuum expectation values of the scalar and spinor currents induced by a homogeneous and constant electric field background in de Sitter spacetime. Following a semiclassical argument, the condition named maximal subtraction imposes the exponential suppression on the massive charged particle limit of the renormalized currents. The maximal subtraction changes the behaviors of the induced currents previously obtained by the conventional minimal subtraction scheme. The maximal subtraction is favored for a couple of physically decent predictions including the identical asymptotic behavior of the scalar and spinor currents, the removal of the IR hyperconductivity from the scalar current, and the finite current for the massless fermion.

  7. Using tradeable permits to achieve sustainability in the world's large cities. Policy design issues and efficiency conditions for controlling vehicle emissions, congestion and urban decentralization with an application to Mexico City

    International Nuclear Information System (INIS)

    Goddard, H.C.

    1997-01-01

    Many large cities in the world have serious ground level ozone problems, largely the product of vehicular emissions and thus the argued unsustainability of current urban growth patterns is frequently blamed on unrestricted private vehicle use. This article reviews Mexico City's experience with vehicle use restrictions as an emissions control program and develops the conditions for optimal quantitative restrictions on vehicle use and for complementary abatement technologies. The stochastic nature of air pollution outcomes is modelled explicitly in both the static and dynamic formulations of the control problem, in which for the first time in the literature the use of tradeable vehicle use permits is proposed as a cost-effective complement to technological abatement for mobile emissions control. This control regime gives the authorities a broader and more flexible set of instruments with which to deal more effectively with vehicle emissions, and with seasonal and stochastic variation of air quality outcomes. The market in tradeable vehicle use permits would be very competitive with low transactions costs. This control policy would have very favorable impacts on air quality, vehicle congestion and on urban form and development. Given the general political resistance to environmental taxes, this program could constitute a workable and politically palatable set of policies for controlling greenhouse gas emissions from the transport sector. 7 figs., 1 appendix, 23 refs

  8. Innovative options for structuring oil and gas leases and exploration permits on Aboriginal lands

    International Nuclear Information System (INIS)

    Douglas, W.; Wells, M.

    1999-01-01

    Operations in the oil and gas industry that involve exploration and production on Aboriginal lands are definitely more complex than operations on provincial Crown lands and there is clearly a need to meet different objectives. There are many good reasons for a petroleum exploration company to make a risk investment on First Nation lands, and the governing legislation permits considerable latitude in the terms of exploration permits and production leases. Indian Oil and Gas Canada will have to approve any agreement negotiated with a First Nation, so they must be made part of the deal-making process. It is important to recognize the responsibility a company has as a partner of a First Nation to help them achieve the maximum benefits from this non-renewable resource. Aspects considered include: the participants and their needs; terms and conditions in oil and gas leases; innovative compensation models; marketing the royalty share; equity participation, and managing exploration and development risk

  9. ¿PERMITE SER FELIZ LA MORAL CRISTIANA?

    Directory of Open Access Journals (Sweden)

    Waldo Romo P

    2006-01-01

    Full Text Available La pregunta que encabeza el artículo ya es desafiante: "¿Permite ser feliz la moral cristiana?". Existe la posibilidad de responder negativamente. El autor, después de analizar algunos pensadores (Nietzsche, entre ellos que han negado a la moral cristiana la posibilidad de hacer feliz al ser humano, presenta las condiciones de posibilidad para que dicha moral se encauce a ser un camino de felicidad. Entre esas condiciones se destaca: el paso de una moral heterónama a una moral de autonomía teónoma, una moral centrada en la persona más que una moral centrada en la ley, una moral de discipulado que pone primero el amor y luego el cumplimiento normativo. Profundiza, al respecto, en el logion de Jesucristo: "El que me ama, cumple mis mandamientos". Esta enseñanza plantea el orden secuencial de toda moral cristiana: porque se ama a Jesús, se entiende el cumplimiento de las normas. Estas se transforman, entonces, en el "test" verificador del amor. De lo contrario, se permanece en un ritualismo normativo, que en defintiva hastía y no lleva a la felicidad. Por ello, el artículo profundiza en una moral de opción fundamental expresada en actitudes y actos morales coherentes con esa opción. Si las condiciones de posibilidad propuestas se llegan a dar, la interrogante que organiza el artículo tendrá una respuesta positivaThe question that heads this article is already challenging: "Does Christian morality permit one to be happy?" The possibility of responding negatively exists. The author, after analyzing the contributions of some thinkers (Nietszche among them who have denied the possibility that Christian morality could make human beings happy, presents the conditions that would orient said morality towards the possibility of becoming a path to happiness. Among those conditions, the author highlights: the passage from a "heteronomous" morality to a morality of "theonomous" autonomy, a morality centered on the person rather than a morality

  10. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  11. 224-T Transuranic Waste Storage and Assay Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-01-01

    Westinghouse Hanford Company is a major contractor to the US Department of Energy Richland Field Office and serves as cooperator of the 224-T Transuranic Waste Storage and Assay Facility, the storage unit addressed in this permit application. At the time of submission of this portion of the Hanford Facility. Dangerous Waste Permit Application covering the 224-T Transuranic Waste Storage and Assay Facility, many issues identified in comments to the draft Hanford Facility Dangerous Waste Permit remain unresolved. This permit application reflects the positions taken by the US Department of Energy, Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application (Revision 0) consists of both a Part A and Part B permit application. An explanation of the Part A revisions associated with this unit, including the Part A revision currently in effect, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application contains information current as of March 1, 1992

  12. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  13. Application of a tablet film coating model to define a process-imposed transition boundary for robust film coating.

    Science.gov (United States)

    van den Ban, Sander; Pitt, Kendal G; Whiteman, Marshall

    2018-02-01

    A scientific understanding of interaction of product, film coat, film coating process, and equipment is important to enable design and operation of industrial scale pharmaceutical film coating processes that are robust and provide the level of control required to consistently deliver quality film coated product. Thermodynamic film coating conditions provided in the tablet film coating process impact film coat formation and subsequent product quality. A thermodynamic film coating model was used to evaluate film coating process performance over a wide range of film coating equipment from pilot to industrial scale (2.5-400 kg). An approximate process-imposed transition boundary, from operating in a dry to a wet environment, was derived, for relative humidity and exhaust temperature, and used to understand the impact of the film coating process on product formulation and process control requirements. This approximate transition boundary may aid in an enhanced understanding of risk to product quality, application of modern Quality by Design (QbD) based product development, technology transfer and scale-up, and support the science-based justification of critical process parameters (CPPs).

  14. Modeling and Computation of Transboundary Industrial Pollution with Emission Permits Trading by Stochastic Differential Game.

    Directory of Open Access Journals (Sweden)

    Shuhua Chang

    Full Text Available Transboundary industrial pollution requires international actions to control its formation and effects. In this paper, we present a stochastic differential game to model the transboundary industrial pollution problems with emission permits trading. More generally, the process of emission permits price is assumed to be stochastic and to follow a geometric Brownian motion (GBM. We make use of stochastic optimal control theory to derive the system of Hamilton-Jacobi-Bellman (HJB equations satisfied by the value functions for the cooperative and the noncooperative games, respectively, and then propose a so-called fitted finite volume method to solve it. The efficiency and the usefulness of this method are illustrated by the numerical experiments. The two regions' cooperative and noncooperative optimal emission paths, which maximize the regions' discounted streams of the net revenues, together with the value functions, are obtained. Additionally, we can also obtain the threshold conditions for the two regions to decide whether they cooperate or not in different cases. The effects of parameters in the established model on the results have been also examined. All the results demonstrate that the stochastic emission permits prices can motivate the players to make more flexible strategic decisions in the games.

  15. Public opinion on imposing restrictions to people with an alcohol- or drug addiction : A cross-sectional survey

    NARCIS (Netherlands)

    van Boekel, L.C.; Brouwers, E.P.M.; van Weeghel, J.; Garretsen, H.F.L.

    2013-01-01

    Purpose Alcohol- and drug addiction tends to evoke disapproval and rejection among people. This study provides insight into the origin of people’s negative attitudes towards these people. Corrigan’s attribution model is used to examine intentions of the Dutch public to impose restrictions to people

  16. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  17. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  18. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  19. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  20. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  1. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  2. The Effect of Emission Permits and Pigouvian Taxes on Market Structure

    Energy Technology Data Exchange (ETDEWEB)

    Bunuel, M.

    2001-07-01

    Differently from Pigouvian taxes and direct regulation, tradable emission permits can decrease competition in a polluting industry under certain circumstances. Assume a potential entrant who can buy every permit. When permits are given free to current polluters, monopolization occurs if not every polluter foresees it. If foreseen, polluters want to free ride on the entrant's market power, but entry can still occur, although not with certainty. Considering a symmetric, mixed-strategy equilibrium with unconditional bids, the probability of entry decreases as the number of polluters increase. When permits are sold initially, monopolization occurs without more requirements than polluters being financially constrained. (Author)

  3. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  4. On the identification of fractionally cointegrated VAR models with the F(d) condition

    DEFF Research Database (Denmark)

    Santucci de Magistris, Paolo; Carlini, Federico

    for any choice of the lag-length when the true cointegration rank is known. The properties of these multiple non-identified models are studied and a necessary and sufficient condition for the identification of the fractional parameters of the system is provided. The condition is named F(d......). This is a generalization of the well-known I(1) condition to the fractional case. Imposing a proper restriction on the fractional integration parameter, d, is sufficient to guarantee identification of all model parameters and the validity of the F(d) condition. The paper also illustrates the indeterminacy between...

  5. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  6. Wilderness Management... A Computerized System for Summarizing Permit Information

    Science.gov (United States)

    Gary H. Elsner

    1972-01-01

    Permits were first needed for visits to wilderness areas in California during summer 1971. A computerized system for analyzing these permits and summarizing information from them has been developed. It produces four types of summary tables: point-of-origin of visitors; daily variation in total number of persons present; variations in group size; and variations in...

  7. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  8. Auctioning emission permits in a leader-follower setting

    OpenAIRE

    Alvarez, Francisco; André, Francisco J.

    2015-01-01

    We analise emission permit auctions under leader-follower competition when the leader bids strategically and the follower acts as price-taker both at the auction and the secondary market. We obtain linear equilibrium bidding strategies for both firms and a unique equilibrium of the auction, which is optimal ex-post for the leader. Under specific distributional assumptions we conclude that the auction always awards less permits to the leader than the cost-effective amount. Our central result i...

  9. Three-party quantum teleportation using thermal states in Heisenberg XX model with open boundary condition

    International Nuclear Information System (INIS)

    Bhan, Jaemi; Kwon, Younghun

    2007-01-01

    Recently Yeo showed that thermal states in Heisenberg XX model with periodic boundary condition could be used for three-party quantum teleportation. However it is hard to implement the periodic boundary condition in spin chain. So instead of imposing the periodic boundary condition, we consider open boundary condition in Heisenberg XX model and investigate the possibility of using thermal states in Heisenberg XX model with open boundary condition. Using this way, we find the best fidelity conditions to three known protocols in three-party quantum teleportation. It turns out that the best fidelity in every protocol would be 23

  10. New Fast Beam Conditions Monitoring (BCM1F) system for CMS

    Science.gov (United States)

    Zagozdzinska, A. A.; Bell, A. J.; Dabrowski, A. E.; Hempel, M.; Henschel, H. M.; Karacheban, O.; Przyborowski, D.; Leonard, J. L.; Penno, M.; Pozniak, K. T.; Miraglia, M.; Lange, W.; Lohmann, W.; Ryjov, V.; Lokhovitskiy, A.; Stickland, D.; Walsh, R.

    2016-01-01

    The CMS Beam Radiation Instrumentation and Luminosity (BRIL) project is composed of several systems providing the experiment protection from adverse beam conditions while also measuring the online luminosity and beam background. Although the readout bandwidth of the Fast Beam Conditions Monitoring system (BCM1F—one of the faster monitoring systems of the CMS BRIL), was sufficient for the initial LHC conditions, the foreseen enhancement of the beams parameters after the LHC Long Shutdown-1 (LS1) imposed the upgrade of the system. This paper presents the new BCM1F, which is designed to provide real-time fast diagnosis of beam conditions and instantaneous luminosity with readout able to resolve the 25 ns bunch structure.

  11. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  12. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  13. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  14. 12 CFR 19.135 - Applications for stay or review of disciplinary actions imposed by registered clearing agencies.

    Science.gov (United States)

    2010-01-01

    ... Involving the Federal Securities Laws § 19.135 Applications for stay or review of disciplinary actions... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Applications for stay or review of disciplinary actions imposed by registered clearing agencies. 19.135 Section 19.135 Banks and Banking COMPTROLLER OF...

  15. Using tradeable permits to achieve sustainability in the world`s large cities. Policy design issues and efficiency conditions for controlling vehicle emissions, congestion and urban decentralization with an application to Mexico City

    Energy Technology Data Exchange (ETDEWEB)

    Goddard, H.C. [Instituto Tecnologico Autonomo de Mexico, Mexico City (Mexico)

    1997-07-01

    Many large cities in the world have serious ground level ozone problems, largely the product of vehicular emissions and thus the argued unsustainability of current urban growth patterns is frequently blamed on unrestricted private vehicle use. This article reviews Mexico City`s experience with vehicle use restrictions as an emissions control program and develops the conditions for optimal quantitative restrictions on vehicle use and for complementary abatement technologies. The stochastic nature of air pollution outcomes is modelled explicitly in both the static and dynamic formulations of the control problem, in which for the first time in the literature the use of tradeable vehicle use permits is proposed as a cost-effective complement to technological abatement for mobile emissions control. This control regime gives the authorities a broader and more flexible set of instruments with which to deal more effectively with vehicle emissions, and with seasonal and stochastic variation of air quality outcomes. The market in tradeable vehicle use permits would be very competitive with low transactions costs. This control policy would have very favorable impacts on air quality, vehicle congestion and on urban form and development. Given the general political resistance to environmental taxes, this program could constitute a workable and politically palatable set of policies for controlling greenhouse gas emissions from the transport sector. 7 figs., 1 appendix, 23 refs.

  16. Gauge fixing conditions for the SU(3) gauge theory

    International Nuclear Information System (INIS)

    Ragiadakos, Ch.; Viswanathan, K.S.

    1979-01-01

    SU(3) gauge theory is quantized in the temporal gauge A 0 =0. Gauge fixing conditions are imposed completely on the electric field components, conjugate to the vector potential Ssub(i) that belongs to the subalgebra SO(3) of SU(3). The generating functional in terms of the independent variables is derived. It is ghost-free and may be regarded as a theory of (non-relativistic) spin-0, 1, 2, and 3 fields. (Auth.)

  17. Imposed Work of Breathing and Breathing Comfort of Nonintubated Volunteers Breathing with Three Portable Ventilators and a Critical Care Ventilator

    National Research Council Canada - National Science Library

    Austin, Paul

    2001-01-01

    .... The purpose of this study was to assess the imposed inspiratory work of breathing and breathing comfort of nonintubated healthy volunteers breathing spontaneously through three portable ventilators...

  18. Quasi-discrete particle motion in an externally imposed, ordered structure in a dusty plasma at high magnetic field

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Edward, E-mail: etjr@auburn.edu; Konopka, Uwe; Lynch, Brian; Adams, Stephen; LeBlanc, Spencer [Physics Department, Auburn University, Auburn, Alabama 36849 (United States); Merlino, Robert L. [Department of Physics and Astronomy, The University of Iowa, Iowa City, Iowa 52242 (United States); Rosenberg, Marlene [Department of Electrical and Computer Engineering, University of California, San Diego, La Jolla, California 92093 (United States)

    2015-11-15

    Dusty plasmas have been studied in argon, radio frequency (rf) glow discharge plasmas at magnetic fields up to 2.5 T where the electrons and ions are strongly magnetized. Plasmas are generated between two parallel plate electrodes where the lower, powered electrode is solid and the upper electrode supports a dual mesh consisting of #24 brass and #30 aluminum wire cloth. In this experiment, we study the formation of imposed ordered structures and particle dynamics as a function of magnetic field. Through observations of trapped particles and the quasi-discrete (i.e., “hopping”) motion of particles between the trapping locations, it is possible to make a preliminary estimate of the potential structure that confines the particles to a grid structure in the plasma. This information is used to gain insight into the formation of the imposed grid pattern of the dust particles in the plasma.

  19. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  20. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Science.gov (United States)

    2010-07-01

    ... application may be given in lieu of a new application, provided the scope of work does not change... MISCELLANEOUS RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  1. Vulnerability imposed by diet and brain trauma for anxiety-like phenotype: implications for post-traumatic stress disorders.

    Science.gov (United States)

    Tyagi, Ethika; Agrawal, Rahul; Zhuang, Yumei; Abad, Catalina; Waschek, James A; Gomez-Pinilla, Fernando

    2013-01-01

    Mild traumatic brain injury (mTBI, cerebral concussion) is a risk factor for the development of psychiatric illness such as posttraumatic stress disorder (PTSD). We sought to evaluate how omega-3 fatty acids during brain maturation can influence challenges incurred during adulthood (transitioning to unhealthy diet and mTBI) and predispose the brain to a PTSD-like pathobiology. Rats exposed to diets enriched or deficient in omega-3 fatty acids (n-3) during their brain maturation period, were transitioned to a western diet (WD) when becoming adult and then subjected to mTBI. TBI resulted in an increase in anxiety-like behavior and its molecular counterpart NPY1R, a hallmark of PTSD, but these effects were more pronounced in the animals exposed to n-3 deficient diet and switched to WD. The n-3 deficiency followed by WD disrupted BDNF signaling and the activation of elements of BDNF signaling pathway (TrkB, CaMKII, Akt and CREB) in frontal cortex. TBI worsened these effects and more prominently in combination with the n-3 deficiency condition. Moreover, the n-3 deficiency primed the immune system to the challenges imposed by the WD and brain trauma as evidenced by results showing that the WD or mTBI affected brain IL1β levels and peripheral Th17 and Treg subsets only in animals previously conditioned to the n-3 deficient diet. These results provide novel evidence for the capacity of maladaptive dietary habits to lower the threshold for neurological disorders in response to challenges.

  2. 76 FR 50246 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-08-12

    ... species in the wild. Permit Application Number: TE212427. Applicant: Ecology and Environment, Inc... wild. Permit Application Number: TE48835A. Applicant: Applied Science & Technology, Inc., Brighton, MI...

  3. The Redistributive Impact of Restrictive Measures on EU Members: Winners and Losers from Imposing Sanctions on Russia

    NARCIS (Netherlands)

    Giumelli, Francesco

    2017-01-01

    EU sanctions on Russia created concerns among its members. It is well known that sanctions impose a cost on their targets as well as on the senders, as lamented by European governments, but the costs of EU sanctions on its members have not been fully explored. This article intends to fill this gap

  4. 36 CFR 13.932 - How many permits will be issued each summer?

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Preserve Motor Vehicle Permits § 13.932 How many permits will be issued each summer? The superintendent is...

  5. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Operating Permit (Permit Number: V-UO-000979-2017.00), statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Andeavor Walker Hollow Compressor Station.

  6. 49 CFR 176.99 - Permit requirements for certain hazardous materials.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Permit requirements for certain hazardous materials. 176.99 Section 176.99 Transportation Other Regulations Relating to Transportation PIPELINE AND... CARRIAGE BY VESSEL Special Requirements for Barges § 176.99 Permit requirements for certain hazardous...

  7. 40 CFR 233.36 - Modification, suspension or revocation of permits.

    Science.gov (United States)

    2010-07-01

    ... has been submitted to the Director; (iv) Provide for minor modification of project plans that do not... appropriately regulated by individual permits; (4) Circumstances relating to the authorized activity have... cessation of any discharge controlled by the permit; (5) Any significant information relating to the...

  8. Alkylation of hydrothiophosphoryl compounds in conditions of interphase catalysis

    International Nuclear Information System (INIS)

    Aladzheva, I.M.; Odinets, I.L.; Petrovskij, P.V.; Mastryukova, T.A.; Kabachkin, M.I.

    1993-01-01

    A method of interphase catalysis permitted to develop a common method for synthesis of compounds with thiophosphoryl group. The effect of nature of hydrothiophosphoryl compound, alkylating agent, two-phase system and reaction conditions on alkylation product yields was investigated in detail

  9. Enforcing Transferable Permit Systems in the Presence of Market Power

    International Nuclear Information System (INIS)

    Chavez, C.A.; Stanlund, J.K.

    2003-01-01

    We derive an enforcement strategy for a transferable permit system in the presence of market power that achieves complete compliance in a cost-effective manner. We show that the presence of a firm with market influence makes designing an enforcement strategy more difficult than enforcing a perfectly competitive system. We also re-consider the suggestion that a firm with market influence should be allocated permits so that it chooses to not participate in the permit market. When enforcement and its costs are taken into account, that suggestion does not hold except in a very special case

  10. Examining the Functional Specification of Two-Parameter Model under Location and Scale Parameter Condition

    OpenAIRE

    Nakashima, Takahiro

    2006-01-01

    The functional specification of mean-standard deviation approach is examined under location and scale parameter condition. Firstly, the full set of restrictions imposed on the mean-standard deviation function under the location and scale parameter condition are made clear. Secondly, the examination based on the restrictions mentioned in the previous sentence derives the new properties of the mean-standard deviation function on the applicability of additive separability and the curvature of ex...

  11. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  12. 29 CFR 471.14 - What sanctions and penalties may be imposed for noncompliance, and what procedures will the...

    Science.gov (United States)

    2010-07-01

    ... LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement; Compliance Review... 29 Labor 2 2010-07-01 2010-07-01 false What sanctions and penalties may be imposed for...

  13. Working Conditions and Factory Survival: Evidence from Better Factories Cambodia

    OpenAIRE

    Robertson, Raymond; Brown, Drusilla; Dehejia, Rajeev

    2016-01-01

    A large and growing literature has identified several conditions, including exporting, that contribute to plant survival. A prevailing sentiment suggests that anti-sweatshop activity against plants in developing countries adds the risk of making survival more difficult by imposing external constraints that may interfere with optimizing behavior. Using a relatively new plant-level panel dataset from Cambodia, this paper applies survival analysis to estimate the relationship between changes in ...

  14. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  15. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments

  16. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments.

  17. 40 CFR 70.8 - Permit review by EPA and affected States.

    Science.gov (United States)

    2010-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements... PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.8 Permit review by EPA and affected States. (a...

  18. Market Power with Interdependent Demand. Sale of Emission Permits and Natural Gas from Russia

    International Nuclear Information System (INIS)

    Hagem, C.; Kallbekken, S.; Westskog, H.; Maestad, O.

    2006-01-01

    With implementation of the Kyoto Protocol, Russia will most likely be able to exert market power in the emission permit market. But, as Russia is also a big exporter of fossil fuels, the incentives to boost the permit price may be weak. However, a significant share of Russia's fossil fuel exports is natural gas. If a high permit price boosts the demand for natural gas through substitution from more polluting fuels and thus increase gas profits, this may increase the incentives to exert monopoly power in the permit market. Moreover, a large fossil fuel exporter may use its market position to influence the effective demand for permits. Hence, the relationship between permit income and fossil fuels exports runs in both directions. In this article, we explore the interdependence between the revenues from permit and fossil fuel exports both theoretically and numerically. A computable general equilibrium model suggests the fact that Russia as a big gas exporter has small effect on the incentives to exert monopoly power in the permit market. Moreover, Russia's monopoly power in the permit market has a small, but non-negligible impact on the optimal level of Russian gas exports. (author)

  19. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  20. 76 FR 8374 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N021; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  1. 76 FR 33334 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N112; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  2. 75 FR 52012 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N181; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  3. 75 FR 5101 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-02-01

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N010; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  4. 76 FR 18576 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N056; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  5. 76 FR 10063 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-23

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N026; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  6. 75 FR 27361 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N095; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  7. 78 FR 76171 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-12-16

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and...: Geoffrey Ridder; Utopia, TX; PRT-00030B The applicant requests a permit to export the sport-hunted trophy... period. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  8. 16 CFR 500.25 - Net quantity, average quantity, permitted variations.

    Science.gov (United States)

    2010-01-01

    ... good distribution practice and which unavoidably result in change of weight or mass or measure. (c... good packaging practice: Provided, that such variations shall not be permitted to such extent that the... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Net quantity, average quantity, permitted...

  9. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  10. Web-enabled work permit system for fast breeder test reactor

    International Nuclear Information System (INIS)

    Madurai Meenachi, N.; Vinolia, K.; Ramanathan, V.

    2003-01-01

    The objective of this project is to computerize and web-enable the Work Permit System for the Fast Breeder Test Reactor (FBTR) at IGCAR, Kalpakkam. The existing Work Permit System at FBTR was studied in detail. Since all the formalities were paper-based, the risk of human error in scrutinizing all permits before reactor start-up was high. Compilation of reports (daily, monthly, yearly etc.) was tedious. The work permit system was therefore automated in order to enable the operation group manage the maintenance work carried out in the plant systematically with entries. The entire project was classified into five permit modules -maintenance, transfer, return, cancellation and reissue. Each module takes care of the entry and maintenance of data in their respective fields in their respective tables. The user is also provided with an option to take a hard copy of the report of his/her choice. A client/server based system was designed to web-enable the entire project. The server program was designed using VB 6.0 as the front-end and MS Access database as the back end to store the data. The client software was developed using Active Server Pages and published using personal web server in the Intranet. A number of administrative tools have been incorporated in the software to ensure access security and integrity of the database. An online help feature with search facilities was added to the software. The work permit system software is now already being used at FBTR and has been deemed to be an invaluable aid in empowering the availability of the reactor and determining the performance history of the equipment. (author)

  11. 76 FR 3153 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-01-19

    ... enhancement of survival in the wild. Permit Application Number: TE106220. Applicant: Brianne L. Walters, Terre..., Terre Haute, IN. The applicant requests a renewal of his permit to take (capture and release) Indiana...

  12. 76 FR 454 - Hazardous Materials Transportation: Revisions of Special Permits Procedures

    Science.gov (United States)

    2011-01-05

    ... special permits. The HMR generally are performance-oriented regulations that provide the regulated... forbidden for transportation by aircraft except under a special permit (see Columns 9A and 9B in the table...

  13. 75 FR 45650 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N149; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of an application to...

  14. 75 FR 20621 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2009-N0054]; [30120-1113-0000-F6] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: We, the U.S. Fish and...

  15. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Bridges not requiring a USCG permit. 650.805 Section 650... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... permit is not required for bridge construction. This determination shall be made at an early stage of...

  16. 77 FR 74507 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-12-14

    ... not operate to the disadvantage of the endangered species, and (3) the granted permit would be.... Zoological Park. 2012. 82880A Big Game Studio 77 FR 54604; September 5, October 17, 2012. 2012. 83520A Donald...; fax (703) 358-2280. Brenda Tapia, Program Analyst/Data Administrator, Branch of Permits, Division of...

  17. 36 CFR 71.7 - Entrance fees for single-visit permits.

    Science.gov (United States)

    2010-07-01

    ... either Golden Eagle or Golden Age Passports. (1) The fee for a single-visit permit applicable to those.... “Accompanying,” for the purpose of this section, shall mean entering together with the permittee while being...-visit permit applicable to those persons entering by any means other than private, noncommercial vehicle...

  18. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted...

  19. 36 CFR 251.103 - Mediation of term grazing permit disputes.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Mediation of term grazing... Lands § 251.103 Mediation of term grazing permit disputes. (a) Decisions subject to mediation. In those States with Department of Agriculture certified mediation programs, any holder of a term grazing permit...

  20. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  1. Regulatory aspects of underground disposal of radioactive waste - Danish notes

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    In Denmark, provisions regulating nuclear installations (their licensing, and the disposal of radioactive waste amongst other matters) are contained in an Act of 12 May 1976. This act, however, will only come into force if Denmark decides to implement a nuclear power programme. Under the provisions of this Act, the Minister of the Environment is the licensing authority. He receives recommendations from various bodies, including the Inspectorate of Nuclear Installations, and may impose any conditions thought necessary. Three permits are required - site approval, construction permit, and operation permit - and applications must be accompanied by documentation relevant to environmental and nuclear safety and health aspects. Operation of a nuclear installation may be suspended in cases of urgency. As yet, no detailed safety regulations or guidelines on the disposal of nuclear waste have been issued, but a working party, established by the Environmental Protection Agency, is currently studying the problem. (NEA) [fr

  2. The disciplined healthcare professional: a qualitative interview study on the impact of the disciplinary process and imposed measures in the Netherlands.

    Science.gov (United States)

    Verhoef, Lise M; Weenink, Jan-Willem; Winters, Sjenny; Robben, Paul B M; Westert, Gert P; Kool, Rudolf B

    2015-11-25

    It is known that doctors who receive complaints may have feelings of anger, guilt, shame and depression, both in the short and in the long term. This might lead to functional impairment. Less is known about the impact of the disciplinary process and imposed measures. Previous studies of disciplinary proceedings have mainly focused on identifying characteristics of disciplined doctors and on sentencing policies. Therefore, the aim of this study is to explore what impact the disciplinary process and imposed measures have on healthcare professionals. Semistructured interview study, with purposive sampling and inductive qualitative content analysis. 16 healthcare professionals (9 medical specialists, 3 general practitioners, 2 physiotherapists and 2 psychologists) that were sanctioned by the disciplinary tribunal. The Netherlands. Professionals described feelings of misery and insecurity both during the process as in its aftermath. Furthermore, they reported to fear receiving new complaints and provide care more cautiously after the imposed measure. Factors that may enhance psychological and professional impact are the publication of measures online and in newspapers, media coverage, the feeling of treated as guilty before any verdict has been reached, and the long duration of the process. This study shows that the disciplinary process and imposed measures can have a profound psychological and professional impact on healthcare professionals. Although a disciplinary measure is meant to have a corrective effect, our results suggest that the impact that is experienced by professionals might hamper optimal rehabilitation afterwards. Therefore, organising emotional support should be considered during the disciplinary process and in the period after the verdict. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  3. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  4. A domain-decomposition method to implement electrostatic free boundary conditions in the radial direction for electric discharges

    Science.gov (United States)

    Malagón-Romero, A.; Luque, A.

    2018-04-01

    At high pressure electric discharges typically grow as thin, elongated filaments. In a numerical simulation this large aspect ratio should ideally translate into a narrow, cylindrical computational domain that envelops the discharge as closely as possible. However, the development of the discharge is driven by electrostatic interactions and, if the computational domain is not wide enough, the boundary conditions imposed to the electrostatic potential on the external boundary have a strong effect on the discharge. Most numerical codes circumvent this problem by either using a wide computational domain or by calculating the boundary conditions by integrating the Green's function of an infinite domain. Here we describe an accurate and efficient method to impose free boundary conditions in the radial direction for an elongated electric discharge. To facilitate the use of our method we provide a sample implementation. Finally, we apply the method to solve Poisson's equation in cylindrical coordinates with free boundary conditions in both radial and longitudinal directions. This case is of particular interest for the initial stages of discharges in long gaps or natural discharges in the atmosphere, where it is not practical to extend the simulation volume to be bounded by two electrodes.

  5. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Science.gov (United States)

    2012-04-23

    ... Objection to State Operating Permits for Consolidated Environmental Management, Inc.--Nucor Steel Louisiana... Management, Inc.--Nucor Steel Louisiana (``Nucor'') in Saint James Parish, Louisiana. Pursuant to sections... Environmental Management, Inc.--Nucor Steel Louisiana (``Nucor'') is available electronically at: http://www.epa...

  6. 78 FR 36819 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2013-06-19

    ... the special Centennial, CO. 172.301(c), 180.205(f) permit to authorize and (g), and ultrasonic... special Centennial, CO. 172.302a(b)(2), (4) permit to authorize and (5), 180.205(f) ultrasonic equipment...

  7. 25 CFR 166.220 - What are the basic steps for acquiring a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What are the basic steps for acquiring a permit through negotiation? 166.220 Section 166.220 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.220 What are the basic steps for acquiring a permit through negotiation? The...

  8. Reformulating classical and quantum mechanics in terms of a unified set of consistency conditions

    International Nuclear Information System (INIS)

    Bordley, R.F.

    1983-01-01

    This paper imposes consistency conditions on the path of a particle and shows that they imply Hamilton's principle in classical contexts and Schroedinger's equation in quantum mechanical contexts. Thus this paper provides a common, intuitive foundation for classical and quantum mechanics. It also provides a very new perspective on quantum mechanics. (author

  9. Improved Safety and Efficiency of Protected/Permitted Right-Turns in Oregon

    Science.gov (United States)

    2018-05-01

    This research aimed to develop an understanding of the safety and operational implications of using the flashing yellow arrow (FYA) in permitted and protected/permitted right turn (PPRT) operations to maximize safety and efficiency. This report inclu...

  10. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  11. On the initial conditions for a universe with variable G and c

    International Nuclear Information System (INIS)

    Gomide, F.M.; Uehara, M.

    1978-01-01

    Initial conditions are discussed for a closed universe with matter injection process and with time varying G and c. It is shown that the usual interpretation for the cosmic microwave background radiation can be accepted for this model universe, provided a certain initial condition is imposed on the Pryce-Hoyle field. The time varying c is responsible for two red-shift laws one for wave-length and the other for the frequency. If radiation temperature obeys the red-shift law for frequency, the primordial Planck spectrum can be reproduced along cosmic expansion [pt

  12. LcrQ and SycH function together at the Ysc type III secretion system in Yersinia pestis to impose a hierarchy of secretion.

    Science.gov (United States)

    Wulff-Strobel, Christine R; Williams, Andrew W; Straley, Susan C

    2002-01-01

    LcrQ is a regulatory protein unique to Yersinia. Previous study in Yersinia pseudotuberculosis and Yersinia enterocolitica prompted the model in which LcrQ negatively regulates the expression of a set of virulence proteins called Yops, and its secretion upon activation of the Yop secretion (Ysc) type III secretion system permits full induction of Yops expression. In this study, we tested the hypothesis that LcrQ's effects on Yops expression might be indirect. Excess LcrQ was found to exert an inhibitory effect specifically at the level of Yops secretion, independent of production, and a normal inner Ysc gate protein LcrG was required for this activity. However, overexpression of LcrQ did not prevent YopH secretion, suggesting that LcrQ's effects at the Ysc discriminate among the Yops. We tested this idea by determining the effects of deletion or overexpression of LcrQ, YopH and their common chaperone SycH on early Yop secretion through the Ysc. Together, our findings indicated that LcrQ is not a negative regulator directly, but it acts in partnership with SycH at the Ysc gate to control the entry of a set of Ysc secretion substrates. A hierarchy of YopH secretion before YopE appears to be imposed by SycH in conjunction with both LcrQ and YopH. LcrQ and SycH in addition influenced the deployment of LcrV, a component of the Yops delivery mechanism. Accordingly, LcrQ appears to be a central player in determining the substrate specificity of the Ysc.

  13. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  14. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  15. An outgoing energy flux boundary condition for finite difference ICRP antenna models

    International Nuclear Information System (INIS)

    Batchelor, D.B.; Carter, M.D.

    1992-11-01

    For antennas at the ion cyclotron range of frequencies (ICRF) modeling in vacuum can now be carried out to a high level of detail such that shaping of the current straps, isolating septa, and discrete Faraday shield structures can be included. An efficient approach would be to solve for the fields in the vacuum region near the antenna in three dimensions by finite methods and to match this solution at the plasma-vacuum interface to a solution obtained in the plasma region in one dimension by Fourier methods. This approach has been difficult to carry out because boundary conditions must be imposed at the edge of the finite difference grid on a point-by-point basis, whereas the condition for outgoing energy flux into the plasma is known only in terms of the Fourier transform of the plasma fields. A technique is presented by which a boundary condition can be imposed on the computational grid of a three-dimensional finite difference, or finite element, code by constraining the discrete Fourier transform of the fields at the boundary points to satisfy an outgoing energy flux condition appropriate for the plasma. The boundary condition at a specific grid point appears as a coupling to other grid points on the boundary, with weighting determined by a kemel calctdated from the plasma surface impedance matrix for the various plasma Fourier modes. This boundary condition has been implemented in a finite difference solution of a simple problem in two dimensions, which can also be solved directly by Fourier transformation. Results are presented, and it is shown that the proposed boundary condition does enforce outgoing energy flux and yields the same solution as is obtained by Fourier methods

  16. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    Science.gov (United States)

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  17. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  18. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  19. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  20. A Note on Market Power in an Emission Permits Market with Banking

    International Nuclear Information System (INIS)

    Liski, M.; Montero, J.P.

    2005-01-01

    In this paper, we investigate the effect of market power on equilibrium path of an emission permits market in which firms can bank current permits for use in later periods. In particular, we study the market equilibrium for a large (potentially dominant) firm and competitive fringe with rational expectations. We characterize the equilibrium solution for different permits allocations and discuss the large firms stock-holding constraints needed for credible market manipulation

  1. 12 CFR 226.6 - Account-opening disclosures.

    Science.gov (United States)

    2010-01-01

    ... SYSTEM TRUTH IN LENDING (REGULATION Z) Open-End Credit § 226.6 Account-opening disclosures. (a) Rules... for collection activity after default, attorney's fees whether or not automatically imposed, and post... post-judgment interest rates permitted by law. (C) Taxes imposed on the credit transaction by a state...

  2. Adler's Zero Condition and a Minimally Symmetric Higgs Boson.

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    Long ago Coleman, Callan, Wess and Zumino (CCWZ) constructed the nonlinear sigma model lagrangian based on a general coset G/H. I discuss how CCWZ lagrangian can be (re)derived using only IR data, by imposing Adler's zero condition in conjunction with the unbroken symmetry group H. Applying the technique to the case of composite Higgs models allows one to derive a universal lagrangian for all models where the Higgs arises as a pseudo-Nambu-Goldston boson, up to symmetry-breaking effects.

  3. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  4. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... the logistical and cost concerns regarding the ability of the railroad industry to comply with the... incorporating the applicable GRL Special Permits into the HMR (and FRA's subsequent approval notice) those...

  5. The effects of storage conditions on the viability of ...

    African Journals Online (AJOL)

    Long-terms recoverability of enteropathogens is necessary for future epidemiological studies to screen stool samples when conditions do not permit immediate processing. The aim of this study was to determine the viability and the recoverability of three enteropathogens bacteria (Yersinia enterocolitica, Vibrio cholerae O: 1 ...

  6. Implementation and Testing of Advanced Surface Boundary Conditions Over Complex Terrain in A Semi-idealized Model

    Science.gov (United States)

    Li, Y.; Epifanio, C.

    2017-12-01

    In numerical prediction models, the interaction between the Earth's surface and the atmosphere is typically accounted for in terms of surface layer parameterizations, whose main job is to specify turbulent fluxes of heat, moisture and momentum across the lower boundary of the model domain. In the case of a domain with complex geometry, implementing the flux conditions (particularly the tensor stress condition) at the boundary can be somewhat subtle, and there has been a notable history of confusion in the CFD community over how to formulate and impose such conditions generally. In the atmospheric case, modelers have largely been able to avoid these complications, at least until recently, by assuming that the terrain resolved at typical model resolutions is fairly gentle, in the sense of having relatively shallow slopes. This in turn allows the flux conditions to be imposed as if the lower boundary were essentially flat. Unfortunately, while this flat-boundary assumption is acceptable for coarse resolutions, as grids become more refined and the geometry of the resolved terrain becomes more complex, the appproach is less justified. With this in mind, the goal of our present study is to explore the implementation and usage of the full, unapproximated version of the turbulent flux/stress conditions in atmospheric models, thus taking full account of the complex geometry of the resolved terrain. We propose to implement the conditions using a semi-idealized model developed by Epifanio (2007), in which the discretized boundary conditions are reduced to a large, sparse-matrix problem. The emphasis will be on fluxes of momentum, as the tensor nature of this flux makes the associated stress condition more difficult to impose, although the flux conditions for heat and moisture will be considered as well. With the resulotion of 90 meters, some of the results show that the typical differences between flat-boundary cases and full/stress cases are on the order of 10%, with extreme

  7. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ...-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to take (capture...-listed Drosophila species on the island of Kauai in the State of Hawaii for the purpose of enhancing its... in the State of Hawaii: Astelia waialealae (painiu), Canavalia napaliensis (awikiwiki), Chamaesyce...

  8. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  9. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit. (a) An elephant, hippopotamus, rhinoceros, or tapir shall not be imported into the United States... export an elephant, hippopotamus, rhinoceros, or tapir to the United States; (2) The name and address of...

  10. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  11. The heterogeneity in financial and time burden of caregiving to children with chronic conditions.

    Science.gov (United States)

    Zan, Hua; Scharff, Robert L

    2015-03-01

    We examine the financial and time burdens associated with caring for children with chronic conditions, focusing on disparities across types of conditions. Using linked data from the 2003 to 2006 National Health Interview Survey and 2004-2008 Medical Expenditure Panel Survey, we created measures of financial burden (out-of-pocket healthcare costs, the ratio of out-of-pocket healthcare costs to family income, healthcare costs paid by insurance, and total healthcare costs) and time burden (missed school time due to illness or injury and the number of doctor visits) associated with 14 groups of children's chronic conditions. We used the two-part model to assess the effect of condition on financial burden and finite mixture/latent class model to analyze the time burden of caregiving. Controlling for the influences of other socio-demographic characteristics on caregiving burden, children with chronic conditions have higher financial and time burdens relative to caregiving burdens for healthy children. Levels of financial burden and burden sharing between families and insurance system also vary by type of condition. For example, children with pervasive developmental disorder or heart disease have a relatively low financial burden for families, while imposing a high cost on the insurance system. In contrast, vision difficulties are associated with a high financial burden for families relative to the costs borne by others. With respect to time burden, conditions such as cerebral palsy and heart disease impose a low time burden, while conditions such as pervasive developmental disorder are associated with a high time burden. This study demonstrates that differences exist in caregiving burden for children by type of chronic condition. Each condition has a unique profile of time and financial cost burden for families and the insurance system. These results have implications for policymakers and for families' savings and employment decisions.

  12. A conceptual analysis of the application of tradable permits to biodiversity conservation.

    Science.gov (United States)

    Wissel, Silvia; Wätzold, Frank

    2010-04-01

    Tradable permits have been applied in many areas of environmental policy and may be a response to increasing calls for flexible conservation instruments that successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing that habitat of at least the equivalent ecological value is restored elsewhere. The developer himself does not need to carry out the restoration, but may buy a permit from a third party, thus allowing a market to emerge. Nevertheless, the application of tradable permits to biodiversity conservation is a complex issue because destroyed and restored habitats are likely to differ. There may be various trade-offs between the ecological requirements that destroyed and restored habitats be as similar as possible, and the need for a certain level of market activity to have a functioning trading system. The success of tradable permits as an instrument for reconciling the conflicts between economic development and conservation depends on the existence of certain economic, institutional, and ecological preconditions, for example, a functioning institutional framework, sufficient expert knowledge, and adequate monitoring and enforcement mechanisms.

  13. A decision aid tool for equity issues analysis in emission permit allocations

    International Nuclear Information System (INIS)

    Vaillancourt, K.; Waaub, J.P.

    2004-01-01

    The general intention of global climate agreements is to stabilize greenhouse gases (GHG) concentrations in the atmosphere which contribute to climate change. Climate models indicate that the global average temperature will increase by about 1.4 to 5.8 degrees C by 2100 compared to the 1990 level. This study assumed the participation of all countries, including developing countries, to achieve a global GHG stabilization target. It examined international cooperation mechanisms such as permit trading to achieve global economic efficiency. The study proposed a decision aid tool that provides relevant information on various equitable permit allocation schemes. A dynamic multicriterion model was presented to share the global quantity of permits among 15 regions. Multiple definitions of equity were considered. A realistic simulation of the World-MARKAL energy model was conducted to demonstrate the potential application of the scheme in international negotiations. The goal was to propose a range of permit allocations for each country in order to restrict the number of possibilities and guide negotiations. A model of the global reduction scenario makes it possible to determine cost effective solutions and to calculate reduction costs. Equity issues related to permit allocations were also addressed along with permit allocations and net reduction costs for each region. 45 refs., 5 tabs., 2 figs., 1 appendix

  14. Allocation of emission permits with leakage through capital markets

    International Nuclear Information System (INIS)

    Maestad, Ottar

    2007-01-01

    This paper analyses how tradable emission permits should be allocated to firms when capital is internationally mobile. When international environmental problems are attempted solved through uncoordinated policies between countries, it might be desirable for the home country to issue free emission permits in proportion to the use of capital in order to prevent leakage through international capital movements. The desirability of free emission permits will however be reduced if capital also can be employed in a domestic non-polluting sector. In this case, it may even be optimal to tax the use of capital in the polluting sector. It is also shown that it is always optimal to subsidise the use of capital in the polluting sector if the use of labour is taxed at an optimal rate. Finally, leakage does not affect the optimal domestic emission limit as long as appropriate capital subsidies and labour taxes are implementeed. (author)

  15. Pollution permits allocation and imperfect competition; Allocation de permis de pollution et concurrence imparfaite

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, S.

    2004-12-15

    The aim of this thesis is to highlight the imperfections on the permits markets and to analyze their consequences on markets' efficiency. More precisely, we try to identify the implications of the initial allocation of permits when such imperfections are present. We try to draw some conclusions for the regulator concerning the different forms of the permits' allocation. After having described and compared these forms, we define in which circumstances the initial allocation matters in terms of efficiency. Then, we study different forms of imperfections. First, we take into account the information asymmetry between firms and the regulator and we define an optimal mechanism to sell pollution permits. Then, we analyze a market power on a differentiated pollution permits market. At last, we study the exclusionary manipulation of pollution permits market. (author)

  16. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  17. Effects of Experimentally Imposed Noise on Task Performance of Black Children Attending Day Care Centers Near Elevated Subway Trains.

    Science.gov (United States)

    Hambrick-Dixon, Priscilla Janet

    1986-01-01

    Investigates whether an experimentally imposed 80dB (A) noise affected psychomotor, serial memory words and pictures, incidental memory, visual recall, paired associates, perceptual learning, and coding performance of five-year-old Black children attending day care centers near and far from elevated subways. (HOD)

  18. 75 FR 9248 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2010-03-01

    ... Applications Permit Application Number: TE006012. Applicant: Steven Taylor, Center for Biodiversity, Illinois... State University, Springfield, Missouri. The applicant requests a permit renewal to take (capture and... Application Number: TE02560A. Applicant: Timothy C. Carter, Ball State University, Muncie, Indiana. The...

  19. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... such Presidential Permits: (1) ERA will determine whether an Environmental Impact Statement (EIS) or an...

  20. A Last Glacial Maximum world-ocean simulation at eddy-permitting resolution - Part 1: Experimental design and basic evaluation

    Science.gov (United States)

    Ballarotta, M.; Brodeau, L.; Brandefelt, J.; Lundberg, P.; Döös, K.

    2013-01-01

    Most state-of-the-art climate models include a coarsely resolved oceanic component, which has difficulties in capturing detailed dynamics, and therefore eddy-permitting/eddy-resolving simulations have been developed to reproduce the observed World Ocean. In this study, an eddy-permitting numerical experiment is conducted to simulate the global ocean state for a period of the Last Glacial Maximum (LGM, ~ 26 500 to 19 000 yr ago) and to investigate the improvements due to taking into account these higher spatial scales. The ocean general circulation model is forced by a 49-yr sample of LGM atmospheric fields constructed from a quasi-equilibrated climate-model simulation. The initial state and the bottom boundary condition conform to the Paleoclimate Modelling Intercomparison Project (PMIP) recommendations. Before evaluating the model efficiency in representing the paleo-proxy reconstruction of the surface state, the LGM experiment is in this first part of the investigation, compared with a present-day eddy-permitting hindcast simulation as well as with the available PMIP results. It is shown that the LGM eddy-permitting simulation is consistent with the quasi-equilibrated climate-model simulation, but large discrepancies are found with the PMIP model analyses, probably due to the different equilibration states. The strongest meridional gradients of the sea-surface temperature are located near 40° N and S, this due to particularly large North-Atlantic and Southern-Ocean sea-ice covers. These also modify the locations of the convection sites (where deep-water forms) and most of the LGM Conveyor Belt circulation consequently takes place in a thinner layer than today. Despite some discrepancies with other LGM simulations, a glacial state is captured and the eddy-permitting simulation undertaken here yielded a useful set of data for comparisons with paleo-proxy reconstructions.