WorldWideScience

Sample records for permits appendices include

  1. Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) thelack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

  2. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-18

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical & Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties.

  3. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    International Nuclear Information System (INIS)

    1993-12-01

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment

  4. Special Education Finance in California. Technical Appendices

    Science.gov (United States)

    Hill, Laura; Warren, Paul; Murphy, Patrick; Ugo, Iwunze; Pathak, Aditi

    2016-01-01

    This document presents the technical appendices that accompany the full report, "Special Education Finance in California." The appendices include: (1) Problems with AB 602 and Other State Funding Programs for Special Education; (2) Additional Figures for Analysis of Distribution of Students with Disabilities; (3) Using Supplemental and…

  5. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 6, Chapter D, Appendices D4--D13: Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    This report (Vol. 6) for the WIPP facility contains appendices on the following information: Site characterization; general geology; ecological monitoring; and chemical compatibility of waste forms and container materials.

  6. Appendiceal Diverticulitis Clinically Masquerading as an Appendiceal Carcinoma

    Directory of Open Access Journals (Sweden)

    Tadashi Terada

    2014-01-01

    Full Text Available Appendiceal diverticulosis is a rare condition. Herein reported is a case of appendiceal diverticulosis and diverticulitis clinically masquerading as appendiceal carcinoma. A 62-year-old woman presented with abdominal pain. US and CT showed a tumor measuring 5 × 4 × 4 cm in vermiform appendix. Colon endoscopy showed mucosal elevation and irregularity in the orifice of vermiform appendix. A biopsy of the appendiceal mucosa showed no significant changes. Clinical diagnosis was appendiceal carcinoma and wide excision of terminal ileum, appendix, cecum, and ascending colon was performed. Grossly, the appendix showed a tumor measuring 5 × 3 × 4 cm. The appendiceal lumen was opened, and the appendiceal mucosa was elevated and irregular. The periappendiceal tissue showed thickening. Microscopically, the lesion was multiple appendiceal diverticula. The diverticula were penetrating the muscle layer. The mucosa showed erosions in places. Much fibrosis, abscess formations, and lymphocytic infiltration were seen in the subserosa. Abscesses were also seen in the diverticular lumens. Some diverticula penetrated into the subserosa. The pathologic diagnosis was appendiceal diverticulitis. When they encounter an appendiceal mass, clinicians should consider appendiceal diverticulitis as a differential diagnosis.

  7. Radiographic features of appendiceal colic in children

    International Nuclear Information System (INIS)

    Schisgall, R.M.

    1986-01-01

    The concept of appendiceal colic was introduced in 1980 to explain the common problem of recurrent crampy abdominal pain (RAP) in children. Children with appendiceal colic often have inspissated casts of stool as foreign bodies of the appendix. The radiographic findings of 115 children operated upon for appendiceal colic have been reviewed. The radiographic features of this syndrom have included: filling defects of the appendix (83% incidence of inspissated casts of stool within the appendix); partial filling of the appendix (44% incidence of fecal casts); retained barium behind 72 h (92% incidence of fecal casts blocking egress of barium); non-visualization of the appendix (42% incidence of fecal casts); and distention of the appendix (100% incidence of fecal casts). The correlation of radiographic and operative findings will be presented. A rational approach to the radiographic workup of a child with RAP will be presented. (orig.)

  8. 1986 resource strategy technical appendices. Volume 2

    International Nuclear Information System (INIS)

    1986-01-01

    The following appendices are included: Decision Analysis Model Documentation; WNP-1 and WNP-3 Preservation Cost Analysis; Regional Costs vs. Net Benefits; Supplemental Conservation Results; National Science Foundation (NSF) Definition of Research and Development; Research and Development: ''Short-Term'' Need and ''Long-Term'' Capability Building; and Value of Energy

  9. Jabiluka project - Draft Environmental Impact Statement. Appendices

    International Nuclear Information System (INIS)

    1996-01-01

    The Appendices provide various technical data in support of studies presented in the Main Report, including the guidelines for an EIS at Jabiluka, environmental requirements, waste management plan, water management system criteria, water quality data, transport licensing and security procedures, rehabilitation plus specialist studies into ore characteristics, noise issues and haulage risk assessment. Copyright (1996) Energy Resources of Australia Limited

  10. Evaluation, engineering and development of advanced cyclone processes. Final separating media evaluation and test report (FSMER). Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This report consists of appendices pertaining to the separating media evaluation (calcium nitrate solution) and testing for an advanced cyclone process. Appendices include: materials safety data, aqueous medium regeneration, pH control strategy, and other notes and data.

  11. Uranium milling: Draft generic environmental impact statement: Volume 2, Appendices

    International Nuclear Information System (INIS)

    1979-04-01

    This volume contains appendices supporting the discussions in Volume 1. In some cases, the appendices expound upon arguments developed in the main document; in other cases, supplementary material considered to be relevant but not presented in Volume 1 is included. A third category encompasses reprinting of pertinent documents felt to be necessary for a comprehensive presentation of the current situation, e.g., Public Law 95-604

  12. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  13. CT features of appendiceal mucocele

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Won Jong; Byun, Jae Young; Jung, Jung Im; Lee, Hae Gyu; Park, Young Ha; Shin, Kyung Sub [Catholic University Medical College, Seoul (Korea, Republic of)

    1995-10-15

    To evaluate the usefulness of CT features of appendiceal mucocele in the diagnosis and evaluation of complications. We retrospectively reviewed CT findings and compared with operative findings in 7 cases of pathologically proven appendiceal mucocele. CT findings such as location and extent of the lesion, tissue density, thickness or calcification of the wall, presence of adjacent inflammatory infiltration, and visualization of normal vermiform appendix were analyzed. Appendiceal mucocele was found as homogeneous low density cystic mass adjacent to the cecum, which has no surrounding inflammatory infiltration except in one case of perforation and one case of intussusception. Mean CT number measured in 4 cases was 21 Hounsfield unit. Thin curvilinear calcifications were noted along the cystic wall in 2 cases. Normal vermiform appendix couldn't be demonstrated in all cases. Appendiceal mucocele is characterized by homogeneously low density and thin walled cystic tumor adjacent to cecum without surrounding inflammatory infiltration, and absence of normal vermiform appendix on CT. Therefore, CT is valuable in preventing operative complications of appendiceal mucocele.

  14. Determination on Whether Specialty Minerals Inc. Must be Included in the Simpson Paper Company Shasta Mill Application for a Title V Operating Permit as a Support Facility.

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  16. Mars power system concept definition study. Volume 2: Appendices

    Science.gov (United States)

    Littman, Franklin D.

    1994-01-01

    This report documents the work performed by Rockwell International's Rocketdyne Division on NASA Contract No. NAS3-25808 (Task Order No. 16) entitled 'Mars Power System Definition Study'. This work was performed for NASA's Lewis Research Center (LeRC). The report is divided into two volumes as follows: Volume 1 - Study Results; and Volume 2 - Appendices. The results of the power system characterization studies, operations studies, and technology evaluations are summarized in Volume 1. The appendices include complete, standalone technology development plans for each candidate power system that was investigated.

  17. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  18. Acute abdominal pain presenting as a rare appendiceal duplication: a case report

    Directory of Open Access Journals (Sweden)

    Mahmood Ali

    2012-03-01

    Full Text Available Abstract Introduction Appendiceal duplication is a rare anomaly that can manifest as right lower quadrant pain. There are several variations described for this condition. We recommend aggressive operative management should this anatomical variation present in the presence of acute appendicitis. Case presentation We report the case of a 15-year-old African American girl who presented to our hospital with right lower quadrant pain and was subsequently found to have appendiceal duplication. Conclusion There are two categorical systems that have described and stratified appendiceal duplication. Both classification systems have been outlined and referenced in this case report. A computed tomography scan has been included to provide a visual aid to help identify true vermiform appendiceal duplication. The presence of this anatomical abnormality is not a reason for surgical intervention; however, should this be found in the setting of acute appendicitis, aggressive resection of both appendices is mandatory.

  19. Refinery siting workbook: appendices C to O

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Applicable laws and permits available for the selection and building of petroleum refineries are enclosed. A glossary of pertinent terms is also included. References related to the National Environmental Policy Act, the Clean Air Act, the Federal Water Pollution Control Act, Resource Conservation and Recovery Act, Toxic Substance Control Act, and Wetlands and Coastal Zone are included. Permit information is also presented. (DC)

  20. Assessment of accident risks in the CRBRP. Volume 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-03-01

    Appendices to Volume I include core-related accident-sequence definition, CRBRP risk-assessment sequence-probability determinations, failure-probability data, accident scenario evaluation, radioactive material release analysis, ex-core accident analysis, safety philosophy and design features, calculation of reactor accident consequences, sensitivity study, and risk from fires.

  1. An Evaluation of Project Learning Tree in British Columbia. Appendices.

    Science.gov (United States)

    Conry, Robert F.; And Others

    The volume contains seven appendices (A-G) which accompany the first volume. Appendix A provides a list of project personnel and of teachers who participated in the unit development workshop. Appendix B, composed of six sections, includes the unit lesson plans and teachers' guides used in the field study for grades 3, 5, and 7. The grade materials…

  2. Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS

  3. Funding California Schools: The Revenue Limit System. Technical Appendices

    Science.gov (United States)

    Weston, Margaret

    2010-01-01

    This document presents the technical appendices accompanying the report, "Funding California Schools: The Revenue Limit System." Included are: (1) Revenue Limit Calculation and Decomposition; (2) Data and Methods; and (3) Base Funding Alternative Simulation Results. (Contains 5 tables and 26 footnotes.) [For the main report,…

  4. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  5. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  6. Treatment of appendiceal mass

    DEFF Research Database (Denmark)

    Olsen, Jesper; Skovdal, Jan; Qvist, Niels

    2014-01-01

    -abdominal abscesses and abscesses of any cause other than appendicitis were excluded as were also studies only describing recurrent appendicitis and/or interval appendectomy. Sub-analyses were performed in children, adults, and in mixed populations. RESULTS: A total of 48 studies were found eligible; they included...

  7. Benefit-Cost Analysis of Integrated Paratransit Systems : Volume 6. Technical Appendices.

    Science.gov (United States)

    1979-09-01

    This last volume, includes five technical appendices which document the methodologies used in the benefit-cost analysis. They are the following: Scenario analysis methodology; Impact estimation; Example of impact estimation; Sensitivity analysis; Agg...

  8. Focus on Mentee-Mentor Relationships: The 10th Grade Implementation of iMentor's College Ready Program. Technical Appendices

    Science.gov (United States)

    Merrill, Lisa; Kang, David; Siman, Nina; Soltani, Jasmine

    2016-01-01

    This document presents the technical appendices that accompany the full report entitled:"Focus on Mentee-Mentor Relationships: The 10th Grade Implementation of iMentor's College Ready Program." The appendices include: (1) Mentor Survey Construct Items; (2) Qualative Data Collection and Analysis Methods; and (3) Methods for Estimating the…

  9. Sonographic study about differential diagnosis between acute appendicitis and non-appendicitis in appendices of borderline diameter

    International Nuclear Information System (INIS)

    Chung, Hwan Hoon; Kim, Yun Hwan; Kim, Hong Won; Park, Seung Cheol; Lee, Eun Jeong; Chung, Kyoo Byung; Suh, Won Hyuck

    2000-01-01

    To find out the sonographic criteria which can be effectively used to differentiate acute appendicitis from non-appendicitis in patients with appendices with borderline diameter(5-8 mm). Sixteen patients diagnosed as acute appendicitis, another 16 patients diagnosed as non-appendicitis were included in this study. They complained of RLQ pain and their appendices measured 5-8 mm in diameter on sonogram. Features such as appendiceal wall thickness, presence or absence of air in appendiceal lumen, movability of tip of the appendix, compressibility of the appendix were evaluated on gray-scale sonogram and thereafter, presence or absence of color flow in the wall of the appendix was evaluated on color Doppler sonogram. Thickness of appendiceal wall is 2.98 ± 0.77 mm in acute appendicitis group and 1.73 ± 0.44 mm in non-appendicitis group (p<0.05). When 2.5 mm thickness of appendiceal wall is applied for diagnosis of acute appendicitis, sensitivity is 81.3%, specificity is 87.5% and accuracy is 84.4%. With absence of air in appendiceal lumen, sensitivity is 93.8%, specificity is 68.8% and accuracy is 81.3%. With absence of movability of appendiceal tip, sensitivity is 87.5%, specificity is 50% and accuracy is 68.8%. With absence of compressibility of the appendix, sensitivity is 100%, specificity is 31.3% and accuracy is 65.6%. With color flow in appendiceal wall, sensitivity is 81.3%, specificity is 62.5% and accuracy is 71.9%. The above mentioned criteria show statistically significant difference between acute appendicitis and non-appendicitis groups (p<0.05). When the diameter of the appendix measures 5-8 mm on sonogram, evaluation of thickness of appendiceal wall, air in appendiceal lumen, movability of tip, compressibility and color flow in the wall will be helpful to diagnose the acute appendicitis with confidence.

  10. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  11. Chronic appendicitis and complete appendiceal invagination: UC, CT and MRI findings

    International Nuclear Information System (INIS)

    Diaz, Gabriel; Seehaus, Alberto; Ocantos, Jorge; Diaz, Claudia; Coccaro, Nicolas; Piccioni, Hector

    2003-01-01

    The appendiceal intussusception is a rare entity. Usually there is a predisposing factor such as a tumor, mucocele, etc. We report the case of a 61 years old female patient, with recurrent abdominal pain, localized in the right lower quadrant. We performed different diagnostic imaging exams including: double-contrast barium enema, enteroclysis, ultrasonography, computed tomography and magnetic resonance. After endoscopy a surgical procedure removed the appendix. The pathological anatomy confirmed the diagnosis of an appendiceal intussusception, complicated with a chronic inflammatory process. Appendiceal intussusception and chronic appendicitis are infrequent; it is even more uncommon the association of both entities. In addition, it was not found a predisposing cause to intussusception. For the reasons described above, we conclude that this case is an unusual presentation of appendiceal intussusception, not previously reported. (author)

  12. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    This report is part of a dangerous waste permit application for the storage of wastes from the Purex process at Hanford. Appendices are presented on the following: construction drawings; HSW-5638, specifications for disposal facility for failed equipment, Project CA-1513-A; HWS-8262, specification for Purex equipment disposal, Project CGC 964; storage tunnel checklist; classification of residual tank heels in Purex storage tunnels; emergency plan for Purex facility; training course descriptions; and the Purex storage tunnels engineering study

  13. Final report from VFL Technologies for the pilot-scale thermal treatment of Lower East Fork Poplar Creek floodplain soils. LEFPC appendices. Volume 6. Appendix VI-X

    International Nuclear Information System (INIS)

    1994-09-01

    This final report from VFL Technologies for the pilot-scale thermal treatment of lower East Fork Poplar Creek floodplain soils dated September 1994 contains LEFPC Appendices, Volume 6, Appendix VI - X. These appendices cover the following areas: chain of custody, miscellaneous process calculations (residence time and orifice plate calculations), waste management (mercury and radiation confirmatory testing before and after final verification run), health and safety (training, respirator fit test and radiation work permits), and transportation (soil receipt documentation)

  14. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  15. Geothermal resource assessment for the state of Texas: status of progress, November 1980. Final report. Appendices A through D

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, C.M. Jr.; Caran, S.C.; Gever, C.; Henry, C.D.; Macpherson, G.L.; McBride, M.W.

    1982-03-01

    These appendices include: a folio of county maps showing locations of well data across the state; a computerized tabulation of the wells depicted; an explanation of the computer coding procedures; and a selected bibliography on heat flow and geothermics. (MHR)

  16. Appendiceal Adenocarcinoma Presenting as a Rectal Polyp

    Directory of Open Access Journals (Sweden)

    Erin Fitzgerald

    2016-02-01

    Full Text Available Appendiceal adenocarcinoma typically presents as an incidentally noted appendiceal mass, or with symptoms of right lower quadrant pain that can mimic appendicitis, but local involvement of adjacent organs is uncommon, particularly as the presenting sign. We report on a case of a primary appendiceal cancer initially diagnosed as a rectal polyp based on its appearance in the rectal lumen. The management of the patient was in keeping with standard practice for a rectal polyp, and the diagnosis of appendiceal adenocarcinoma was made intraoperatively. The operative strategy had to be adjusted due to this unexpected finding. Although there are published cases of appendiceal adenocarcinoma inducing intussusception and thus mimicking a cecal polyp, there are no reports in the literature describing invasion of the appendix through the rectal wall and thus mimicking a rectal polyp. The patient is a 75-year-old female who presented with spontaneous hematochezia and, on colonoscopy, was noted to have a rectal polyp that appeared to be located within a diverticulum. When endoscopic mucosal resection was not successful, she was referred to colorectal surgery for a low anterior resection. Preoperative imaging was notable for an enlarged appendix adjacent to the rectum. Intraoperatively, the appendix was found to be densely adherent to the right lateral rectal wall. An en bloc resection of the distal sigmoid colon, proximal rectum and appendix was performed, with pathology demonstrating appendiceal adenocarcinoma that invaded through the rectal wall. The prognosis in this type of malignancy weighs heavily on whether or not perforation and spread throughout the peritoneal cavity have occurred. In this unusual presentation, an en bloc resection is required for a complete resection and to minimize the risk of peritoneal spread. Unusual appearing polyps do not always originate from the bowel wall. Abnormal radiographic findings adjacent to an area of

  17. Hyperbilirubinemia as a predictor for appendiceal perforation

    DEFF Research Database (Denmark)

    Burcharth, J; Pommergaard, H C; Rosenberg, J

    2013-01-01

    Delayed or wrong diagnosis in patients with appendicitis can result in perforation and consequently increased morbidity and mortality. Serum bilirubin may be a useful marker for appendiceal perforation. The purpose of this systematic review was to evaluate studies investigating elevated serum...

  18. Appendiceal hemorrhage – An uncommon cause of lower gastrointestinal bleeding

    Directory of Open Access Journals (Sweden)

    Ching-Chung Chiang

    2011-06-01

    Full Text Available Lower gastrointestinal bleeding is a common disease among elderly patients. The common sources of lower gastrointestinal bleeding include vascular disease, Crohn’s disease, neoplasms, inflammatory bowel disease, hemorrhoids, and ischemic colitis. Lower gastrointestinal bleeding arising from the appendix is an extremely rare condition. We report a case of appendiceal hemorrhage in a young male. Diagnosis was made by multidetector computerized tomography during survey for hematochezia. The patient recovered well after appendectomy. The histological finding revealed focal erosion of appendix mucosa with bleeding.

  19. Worldwide status of energy standards for buildings: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Janda, K.B.; Busch, J.F.

    1993-02-01

    This informal survey was designed to gain information about the worldwide status of energy efficiency standards for buildings, particularly non-residential buildings such as offices, schools, and hotels. The project has three goals: 1. To understand and learn from the experience of countries with existing building energy standards; 2. To locate areas where these lessons might be applied and energy standards might be effectively proposed and developed; and 3. To share the information gathered with all participating countries. These appendices include the survey cover letter, the survey, and the details of selected energy standards in 35 countries, thus providing supporting material for the authors` article of the same title.

  20. Appendiceal diameter: CT versus sonographic measurements

    Energy Technology Data Exchange (ETDEWEB)

    Orscheln, Emily S. [University of Cincinnati Medical Center, Department of Radiology, Cincinnati, OH (United States); Trout, Andrew T. [Cincinnati Children' s Hospital Medical Center, Department of Radiology, Cincinnati, OH (United States)

    2016-03-15

    Ultrasound and CT are the dominant imaging modalities for assessment of suspected pediatric appendicitis, and the most commonly applied diagnostic criterion for both modalities is appendiceal diameter. The classically described cut-off diameter for the diagnosis of appendicitis is 6 mm when using either imaging modality. To demonstrate the fallacy of using the same cut-off diameter for both CT and US in the diagnosis of appendicitis. We conducted a retrospective review of patients younger than 18 years who underwent both US and CT of the appendix within 24 h. The shortest transverse dimension of the appendix was measured at the level of the proximal, mid and distal appendix on US and CT images. We compared mean absolute difference in appendiceal diameter between US and CT, using the paired t-test. We reviewed exams of 155 children (58.7% female) with a mean age of 11.3 ± 4.2 years; 38 of the children (24.5%) were diagnosed with appendicitis. The average time interval between US and CT was 7.0 ± 5.4 h. Mean appendiceal diameter measured by CT was significantly larger than that measured by US in cases without appendicitis (5.3 ± 1.0 mm vs. 4.7 ± 1.1 mm, P < 0.0001) and in cases with appendicitis (8.3 ± 2.2 mm vs. 7.0 ± 2.0 mm, P < 0.0001). Mean absolute diameter difference at any location along the appendix was 1.3-1.4 mm in normal appendices and 2 mm in cases of appendicitis. Measured appendiceal diameter differs between US and CT by 1-2 mm, calling into question use of the same diameter cut-off (6 mm) for both modalities for the diagnosis of appendicitis. (orig.)

  1. Appendiceal diameter: CT versus sonographic measurements

    International Nuclear Information System (INIS)

    Orscheln, Emily S.; Trout, Andrew T.

    2016-01-01

    Ultrasound and CT are the dominant imaging modalities for assessment of suspected pediatric appendicitis, and the most commonly applied diagnostic criterion for both modalities is appendiceal diameter. The classically described cut-off diameter for the diagnosis of appendicitis is 6 mm when using either imaging modality. To demonstrate the fallacy of using the same cut-off diameter for both CT and US in the diagnosis of appendicitis. We conducted a retrospective review of patients younger than 18 years who underwent both US and CT of the appendix within 24 h. The shortest transverse dimension of the appendix was measured at the level of the proximal, mid and distal appendix on US and CT images. We compared mean absolute difference in appendiceal diameter between US and CT, using the paired t-test. We reviewed exams of 155 children (58.7% female) with a mean age of 11.3 ± 4.2 years; 38 of the children (24.5%) were diagnosed with appendicitis. The average time interval between US and CT was 7.0 ± 5.4 h. Mean appendiceal diameter measured by CT was significantly larger than that measured by US in cases without appendicitis (5.3 ± 1.0 mm vs. 4.7 ± 1.1 mm, P < 0.0001) and in cases with appendicitis (8.3 ± 2.2 mm vs. 7.0 ± 2.0 mm, P < 0.0001). Mean absolute diameter difference at any location along the appendix was 1.3-1.4 mm in normal appendices and 2 mm in cases of appendicitis. Measured appendiceal diameter differs between US and CT by 1-2 mm, calling into question use of the same diameter cut-off (6 mm) for both modalities for the diagnosis of appendicitis. (orig.)

  2. 2004 Power marketing program final EIS - final environmental impact statement. Volume 2 - appendices

    International Nuclear Information System (INIS)

    1997-02-01

    This volume contains appendices to the Final Environmental Impact Statement (FEIS) for the Power Marketing Program proposal of the Western Area Power Administration. The FEIS identified peaking power scheduling as the environmentally preferred alternative, and presented the analysis of alternatives and environmental impacts. Sixteen appendices to the FEIS are included in this document. The appendices are: Statutory and Legal Framework; Sierra Nevada Region Customer Groups and Economic Regions; Renewable Technology Cost Information Matrix; Hydrological Assumptions; Recreation Resources; Archaeological and Historical Resources; Incremental Power Resources; Air Quality Regulatory Structure; Energy Generation; Stage Contents Relationships for Regulating Reservoirs; Power Costs; Socioeconomic Impacts; Projected Air Resource Impacts; Land use, Water Quality, and Solid Waste Impact Factors; Draft Environmental Impact Statement Comments and Responses, and Contractor Disclosure Statements. 21 figs., 24 tabs

  3. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 7: Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards.

  4. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  5. A Curriculum Activities Guide to Water Pollution and Environmental Studies, Volume II - Appendices.

    Science.gov (United States)

    Hershey, John T., Ed.; And Others

    This publication, Volume II of a two volume set of water pollution studies, contains seven appendices which support the studies. Appendix 1, Water Quality Parameters, consolidates the technical aspects of water quality including chemical, biological, computer program, and equipment information. Appendix 2, Implementation, outlines techniques…

  6. Case-study application of venture analysis: the integrated energy utility. Volume 3. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Fein, E; Gordon, T J; King, R; Kropp, F G; Shuchman, H L; Stover, J; Hausz, W; Meyer, C

    1978-11-01

    The appendices for a case-study application of venture analysis for an integrated energy utility for commercialization are presented. The following are included and discussed: utility interviews; net social benefits - quantitative calculations; the financial analysis model; market penetration decision model; international district heating systems; political and regulatory environment; institutional impacts.

  7. Injection of radioactive waste by hydraulic fracturing at West Valley, New York. Volume 3. Appendices

    International Nuclear Information System (INIS)

    1978-05-01

    Ten appendices are included: log data, elastic constants for transversely isotropic elastic media by ultrasonic velocity measurement, fracture toughness anisotropy of West Valley shale, in-situ stress measurement techniques, stress measurement data, hydraulic fracturing measurements, enhancement of horizontal crack initiation by jetting, finite element programs for analysis of crack propagation and for groundwater flow analysis, and well data

  8. Report of the Bulletins and Orders Task Force. Volume II. Appendices

    International Nuclear Information System (INIS)

    1980-01-01

    Appendices include: Office of Inspection and Enforcement bulletins; NRR status report on feedwater transients in BWR plants; orders on Babcock and Wilcox Company plants; letters lifting orders; letters issuing auxiliary feedwater system requirements; letter to licensees of all operating reactors, dated October 30, 1979 concerning short-term lessons learned requirements; and letters approving guidelines for preparation of small-break LOCA operating procedures

  9. Preliminary conceptual design study of the RIGGATRON approach to fusion power. Appendices P--T

    International Nuclear Information System (INIS)

    1978-01-01

    The following appendices are included: (1) background information on high strength materials; (2) parametric systems analysis and economic studies; (3) RIGGATRON plants for materials irradiation testing; (4) RIGGATRON recycling model and cost; and (5) impact analysis of the commerical application of RIGGATRON fusion power concept

  10. Generic environmental impact statement on handling and storage of spent light water power reactor fuel. Appendices

    International Nuclear Information System (INIS)

    1978-03-01

    Detailed appendices are included with the following titles: light water reactor fuel cycle, present practice, model 1000MW(e) coal-fired power plant, increasing fuel storage capacity, spent fuel transshipment, spent fuel generation and storage data (1976-2000), characteristics of nuclear fuel, and ''away-from-reactor'' storage concept

  11. Refinery siting workbook: appendices A and B

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The objective of this effort is to develop and provide basic refinery-related information for use by state and local government officials as a basis for establishing responsible refinery siting requirements and policies consistent with the federal clean air and water standards and socio-economic concerns. The report will be organized into two volumes. The main text comprises the basic topics of physical concerns, regulatory requirements, and permitting activities, while the second volume includes the detailed appendix materials such as the applicable laws, and the necessary permits, as available and a glossary of pertinent terms. As a means to this objective, three refinery sizes, 200,000, 100,000 and 30,000 barrels per day crude charge will be discussed in technical terms. Process unit configuration will be presented which will maximize either gasoline or heating oil production with either sweet or sour crude oil feedstocks. The major issues affecting the socio-economic impact of siting the refinery in a given locale will be presented. These data will review the factors affecting the human environment and the issues that must be addressed to assess the impact that a refinery will have on a community. The key federal registrations which impact upon a refinery siting decision shall be reviewed. Summaries of these regulations and a simplified decision diagram for the air and water acts shall be presented to assist both government and refinery officials in understanding the scope of regulatory impact. All pertinent procedures required for refinery permitting shall be reviewed under the generalized headings of air, water, health and safety, land use, and miscellaneous permits. This categorization at the federal, state and local levels of government shall be used as a basis for establishing degrees of emphasis.

  12. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices B through K

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US. Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices B--K of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  13. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices L through P

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices L-P of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  14. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  15. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  16. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 2. Appendices. [Appendices only

    Energy Technology Data Exchange (ETDEWEB)

    Liverman, James L.

    1977-09-01

    Volume 2 is comprised of appendices: Portsmouth Gaseous Diffusion Plant Existing Facilities; Ecology; Civic Involvement; Social Analysis; Population Projections; Toxicity of Air Pollutants to Biota at Portsmouth Gaseous Diffusion Plant; and Assessment of Noise Effects of an Add-On to the Portsmouth Gaseous Diffusion Plant. (LK)

  17. Tiger Team Assessment of the Savannah River Site: Appendices

    International Nuclear Information System (INIS)

    1990-06-01

    This draft document contains findings identified during the Tiger Team Compliance Assessment of the US Department of Energy Savannah River Site (SRS), located in three countries (Aiken, Barnwell and Allendale), South Carolina. The Assessment was directed by the Department's Office of the Assistant Secretary for Environment, Safety, and Health (ES ampersand H) and was conducted from January 29 to March 23, 1990. The Savannah River Site Tiger Team Compliance Assessment was broad in scope covering the Environment, Safety and Health, and Management areas and was designed to determine the site's compliance with applicable Federal (including DOE), state, and local regulations and requirements. The scope of the Environmental assessment was sitewide while the Safety and Health assessments included site operating facilities (except reactors), and the sitewide elements of Aviation Safety, Emergency Preparedness, Medical Services, and Packaging and Transportation. This report contains the appendices to the assessment

  18. Single-incision laparoscopic cecectomy for low-grade appendiceal mucinous neoplasm after laparoscopic rectectomy

    Science.gov (United States)

    Fujino, Shiki; Miyoshi, Norikatsu; Noura, Shingo; Shingai, Tatsushi; Tomita, Yasuhiko; Ohue, Masayuki; Yano, Masahiko

    2014-01-01

    In this case report, we discuss single-incision laparoscopic cecectomy for low-grade appendiceal neoplasm after laparoscopic anterior resection for rectal cancer. The optimal surgical therapy for low-grade appendiceal neoplasm is controversial; currently, the options include appendectomy, cecectomy, right hemicolectomy, and open or laparoscopic surgery. Due to the risk of pseudomyxoma peritonei, complete resection without rupture is necessary. We have encountered 5 cases of low-grade appendiceal neoplasm and all 5 patients had no lymph node metastasis. We chose the appendectomy or cecectomy without lymph node dissection if preoperative imaging studies did not suspect malignancy. In the present case, we performed cecectomy without lymph node dissection by single-incision laparoscopic surgery (SILS), which is reported to be a reduced port surgery associated with decreased invasiveness and patient stress compared with conventional laparoscopic surgery. We are confident that SILS is a feasible alternative to traditional surgical procedures for borderline tumors, such as low-grade appendiceal neoplasms. PMID:24868331

  19. Local Agenda 21 in Apeldoorn, Netherlands. Appendices

    International Nuclear Information System (INIS)

    Dullens, M.; Schouw, J.C.; Straatman, T.G.

    1999-08-01

    The (im)possibilities of concrete projects to start Local Agenda 21 activities in Apeldoorn, Netherlands, are discussed. Attention is paid to options with respect to transportation, energy conservation, water use, soil pollution, waste management, and nature. Local Agenda 21 is a program by means of which local governments can contribute to sustainable targets as formulated during the 1992 conference Agenda 21 of the United Nations (UN). The appendices contain background information (reports of meetings, elaboration of ecological subjects in relation with socio-economic subjects, and a table with all the recommendations) and are published in this report. The main report is a separate publication

  20. Appendiceal diverticulum associated with chronic appendicitis

    OpenAIRE

    Zubieta-O’Farrill, Gregorio; Guerra-Mora, José Raúl; Gudiño-Chávez, Andrés; Gonzalez-Alvarado, Carlos; Cornejo-López, Gilberto Bernabe; Villanueva-Sáenz, Eduardo

    2014-01-01

    INTRODUCTION: Appendiceal diverticulosis is a rare entity, with a global incidence between 0.004% and 2.1% of all appendectomies. It has been related with an elevated risk of perforation in comparison to acute appendicitis, as well as an increased risk for synchronic appendicular cancer in 48% of the cases, and colonic cancer in 43%. The incidence of chronic appendicitis has been reported in 1.5% of all appendicitis cases. PRESENTATION OF CASE: We present a 73-year-old female, with no rele...

  1. Immunohistochemistry - Microarray Analysis of Patients with Peritoneal Metastases of Appendiceal or Colorectal Origin

    Directory of Open Access Journals (Sweden)

    Danielle E Green

    2015-01-01

    Full Text Available BackgroundThe value of immunohistochemistry (IHC-microarray analysis of pathological specimens in the management of patients is controversial although preliminary data suggests potential benefit. We describe the characteristics of patients undergoing a commercially available IHC-microarray method in patients with peritoneal metastases (PM and the feasibility of this technique in this population.MethodsWe retrospectively analyzed consecutive patients with pathologically confirmed PM from appendiceal or colorectal primary who underwent Caris Molecular IntelligenceTM testing. IHC, microarray, FISH and mutational analysis were included and stratified by PCI score, histology and treatment characteristics. Statistical analysis was performed using non-parametric tests.ResultsOur study included 5 patients with appendiceal and 11 with colorectal PM. The median age of patients was 51 (IQR 39-65 years, with 11(68% female. The median PCI score of the patients was 17(IQR 10-25. Hyperthermic intra-peritoneal chemoperfusion (HIPEC was performed in 4 (80% patients with appendiceal primary tumors and 4 (36% with colorectal primary. KRAS mutations were encountered in 40% of appendiceal vs. 30% colorectal tumors, while BRAF mutations were seen in 40% of colorectal PM and none of the patients with appendiceal PM (p=0.06. IHC biomarker expression was not significantly different between the two primaries. Sufficient tumor for microarray analysis was found in 44% (n=7 patients, which was not associated with previous use of chemotherapy (p>0.20 for 5-FU/LV, Irinotecan and Oxaliplatin.ConclusionsIn a small sample of patients with peritoneal metastases, the feasibility and results of IHC-microarray staining based on a commercially available test is reported. The apparent high incidence of the BRAF mutation in patients with PM may potentially offer opportunities for novel therapeutics and suggest that IHC-microarray is a method that can be used in this population.

  2. Market analysis of shale oil co-products. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-01

    Data are presented in these appendices on the marketing and economic potential for soda ash, aluminia, and nahcolite as by-products of shale oil production. Appendices 1 and 2 contain data on the estimated capital and operating cost of an oil shales/mineral co-products recovery facility. Appendix 3 contains the marketing research data.

  3. 12 CFR Appendices F-I to Part 41 - [Reserved

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false [Reserved] F Appendices F-I to Part 41 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY FAIR CREDIT REPORTING Appendices F-I to Part 41[Reserved] ...

  4. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  5. WECC Variable Generation Planning Reference Book: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-13

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

  6. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  7. Analysis of potential combustion source impacts on acid deposition using an independently derived inventory. Volume II, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1983-12-01

    This document contains 2 appendices. The first documents the methodologies used to calculate production, unit energy consumption, fuel type and emission estimates for 16 industries and 35 types of facilities utilizing direct-fired industrial combustion processes, located in 26 states (and the District of Columbia) east of the Mississippi River. As discussed in the text of this report, a U.S. total of 16 industries and 45 types of facilities utilizing direct-fired combustion processes were identified by an elimination type method that was developed based on evaluation of fuel use in industrial SIC codes 20-39 to identify pollutant sources contributing to acid rain. The final population included only plants that have direct-fired fuel consumption greater than or equal to 100 x 10/sup 9/ Btu/yr of equivalent energy consumption. The goal for this analysis was to provide at least a 1980 base year for the data. This was achieved for all of the industries and in fact, 1981 data were used for a number of the industries evaluated. The second contains an analysis of all consumption of major fossil fuels to: (1) identify all fuel usage categories, and (2) identify the kinds of combustion equipment used within each category. This analysis provides a frame of reference for the balance of the study and permits using an energy accounting methodology to quantify the degree to which the inventoried sources in individual consuming sectors are complete and representative of the total population for the sector.

  8. [Acute abdomen secondary to appendiceal intussusception].

    Science.gov (United States)

    Betancourth-Alvarenga, J E; Vázquez-Rueda, F; Murcia-Pascual, F J; Ayala-Montoro, J

    2015-01-01

    Appendiceal intussusception is a rare condition that can occur at any age. Only a few cases have been reported, and most are found during surgery. The therapeutic approach is usually surgical, ranging from an appendectomy to a hemicolectomy, primarily for biopsy and to rule out possible malignancy. Three cases of children under 14 years who underwent surgery for acute abdominal pain located in the right iliac fossa are presented; one with preoperative diagnosis by ultrasound, and the other two with positive intraoperative findings of intussusception of the cecal appendix, with acute appendicitis being histologically confirmed. Copyright © 2013 Asociación Española de Pediatría. Published by Elsevier Espana. All rights reserved.

  9. Magnetic Fusion Energy Program. Volume I. Introduction, technical summaries, list of publications, etc., Appendices A-K. Annual report

    International Nuclear Information System (INIS)

    Aamodt, R.E.; Byrne, R.N.; Catto, P.J.

    1979-12-01

    An abstract was prepared for the progress summary on transport theory for open and closed magnetic configurations. Seven abstracts were prepared for included appendices of more detailed work on individual devices. Also included is a list of publications, technical presentations, and DOE program contributions

  10. INEL environmental characterization report. Volume III. Appendices E-H

    International Nuclear Information System (INIS)

    1984-09-01

    This volume contains the following appendices: (1) INEL subsurface hydrology; (2) cultural resources assessment of two study areas on the INEL; (3) description of INEL facilities; and (4) effluent measurements and environmental monitoring programs

  11. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  12. Computed tomography of appendiceal mucocele and peritoneal pseudomyxoma

    International Nuclear Information System (INIS)

    Lund, G.; Lien, H.H.

    1982-01-01

    Peritoneal pseudomyxoma is a colloidal growth, which develops on the peritoneum, often secondary to an ovarian tumor or mucocele of the appendix. The conventional radiographic findings of appendiceal mucocele were described by Akerlund, and the CT-pseudomyxoma have been reported by Seshul and Coulam. The present case illustrates the CT-findings of an appendiceal mucocele as well as the complicating peritoneal pseudomyxoma. (orig.)

  13. Appendiceal pathology at the time of oophorectomy for ovarian neoplasms.

    Science.gov (United States)

    Timofeev, Julia; Galgano, Mary T; Stoler, Mark H; Lachance, Jason A; Modesitt, Susan C; Jazaeri, Amir A

    2010-12-01

    To investigate the prevalence of appendiceal pathology in women undergoing surgery for a suspected ovarian neoplasm and the predictive value of intraoperative findings to determine the need for appendectomy at the time of surgery. Retrospective analysis of patients who underwent oophorectomy and appendectomy during the same surgical procedures at the University of Virginia Health System from 1992 to 2007. Observations were stratified based on the nature (benign, borderline, or malignant) and histology (serous compared with mucinous) of the ovarian neoplasm, frozen compared with final pathological diagnosis, and the gross appearance of the appendix. Among the 191 patients identified, frozen section was consistent with seven mucinous and 35 serous carcinomas, 16 serous and 33 mucinous borderline tumors, 71 mucinous and serous cystadenomas, and 29 cases of suspected metastatic tumor from a gastrointestinal primary. The highest rates of coexisting appendiceal pathology were associated with serous ovarian cancers (94.4% of grossly abnormal and 35.3% of normal appendices) and ovarian tumors suspected to be of primary gastrointestinal origin (83.3% grossly abnormal and 60.0% normal appendices harbored coexisting mucinous neoplasms). Linear regression analysis revealed that appearance of the appendix and frozen section diagnosis of the ovarian pathology were statistically significant predictors of coexisting appendiceal pathology, but the latter was more important. The prevalence of coexisting, clinically significant appendiceal pathology is low with a frozen section diagnosis of serous or mucinous cystadenoma. Appendectomy is recommended when frozen section diagnosis is mucinous or serous ovarian carcinoma, borderline tumor or metastatic carcinoma of suspected gastrointestinal origin.

  14. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  15. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  16. Geothermal resource assessment for the state of Texas: status of progress, November 1980. Final report. Appendices E through H

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, C.M. Jr.; Caran, S.C.; Gever, C.; Henry, C.D.; Macpherson, G.L.; McBride, M.W.

    1982-03-01

    These appendices include: a folio of maps showing lineaments perceived across the state; an index and critique of the Landsat images used in perceiving the lineaments; a selected bibliography on lineaments; and a discussion of area-specific assessments of geothermal resources near military bases in Bexar, Travis, and Val Verde Counties. (MHR)

  17. Appendiceal immunoglobulin G4-related disease mimicking appendiceal tumor or appendicitis: A case report

    International Nuclear Information System (INIS)

    Kim, Hyun Soo; Kang, Won Kyung; Chung, Dong Jin

    2016-01-01

    Immunoglobulin G4 (IgG4)-related disease is an autoimmune disease that forms tumorous lesions. Several cases involving various organs are reported, however, IgG4-related disease involving appendix has not been reported yet. In this report, we presented a case of IgG4-related disease of appendix, which raised a suspicion of appendiceal tumor or usual appendicitis and, therefore, led to unnecessary surgical resection. IgG4-related disease should be considered in the differential diagnosis for a mass-like swelling of the appendix, in order to avoid unnecessary surgery

  18. Appendiceal immunoglobulin G4-related disease mimicking appendiceal tumor or appendicitis: A case report

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyun Soo; Kang, Won Kyung; Chung, Dong Jin [Yeouido St. Mary' s Hospital, The Catholic University of Korea, Seoul (Korea, Republic of)

    2016-02-15

    Immunoglobulin G4 (IgG4)-related disease is an autoimmune disease that forms tumorous lesions. Several cases involving various organs are reported, however, IgG4-related disease involving appendix has not been reported yet. In this report, we presented a case of IgG4-related disease of appendix, which raised a suspicion of appendiceal tumor or usual appendicitis and, therefore, led to unnecessary surgical resection. IgG4-related disease should be considered in the differential diagnosis for a mass-like swelling of the appendix, in order to avoid unnecessary surgery.

  19. Appendiceal Abscesses Reduced in Size by Drainage of Pus from the Appendiceal Orifice during Colonoscopy: A Report of Three Cases

    Directory of Open Access Journals (Sweden)

    Shinjiro Kobayashi

    2014-11-01

    Full Text Available Interval appendectomy (IA for appendiceal abscesses is useful for avoiding extended surgery and preventing postoperative complications. However, IA has problems in that it takes time before an abscess is reduced in size in some cases and in that elective surgery may result in a delay in treatment in patients with a malignant tumor of the appendix. In order to rule out malignancy, we performed colonoscopy on three patients with an appendiceal abscess that did not decrease in size 5 or more days after IA. After malignancy had been ruled out by examination of the area of the appendiceal orifice, the appendiceal orifice was compressed with a colonoscope, and a catheter was inserted through the orifice. Then, drainage of pus was observed from the appendiceal orifice into the cecal lumen. Computed tomography performed 3 days after colonoscopy revealed a marked reduction in abscess size in all patients. No endoscopy-related complication was noted. Colonoscopy in patients with an appendiceal abscess may not only differentiate malignant tumors, but also accelerate reduction in abscess size.

  20. Remedial actions at the former Vanadium Corporation of America uranium mill site, Durango, La Plata County, Colorado. Volume II. Appendices. Final Environmental Impact Statement

    International Nuclear Information System (INIS)

    1985-10-01

    Volume 2 contains the following: addendums to Appendices A - Conceptual Designs and Engineering Evaluations for Remedial Action Alternative 3b, D - Meteorological and Air-Quality Information, F - Water Resources Information, H - Radiological Information, I - Information on Populations, Socioeconomics, and Land Use; Appendix K - List of Agencies, Organizations, and Persons Receiving Copies of this Statement; Appendix L - Wildlife Mitigation Plan; Appendix M - Seismic Evaluation; Appendix N - Tourism Evaluation; and Appendix O - Permits, Licenses, and Approvals

  1. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  2. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  3. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  4. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  5. Bladder metastases of appendiceal mucinous adenocarcinoma: a case presentation

    Directory of Open Access Journals (Sweden)

    Giusti Guido

    2010-02-01

    Full Text Available Abstract Background Appendiceal adenocarcinoma is rare with a frequency of 0.08% of all surgically removed appendices. Few cases of appendiceal carcinoma infiltrating the bladder wall for spatial contiguity have been documented. Case Presentation A case is reported of a 45-years old woman with mucinous cystadenocarcinoma of the appendix with bladder metastasis. Although ultrasonography and voided urinary cytology were negative, abdomen computed tomography (CT scan and cystoscopy and subsequent pathological examination revealed a mass exclusively located in the anterior wall of the bladder. Histopathology of the transurethral bladder resection revealed a bladder adenocarcinoma [6 cm (at the maximum diameter × 2,5 cm; approximate weight: 10 gr] with focal mucinous aspects penetrating the muscle and perivisceral fat. Laparotomy evidenced the presence of a solid mass of the appendix (2,5 cm × 3 cm × 2 cm extending to the loco-regional lymph nodes. Appendectomy and right hemicolectomy, linfoadenectomy and partial cystectomy were performed. The subsequent pathological examination revealed a mucinous cystadenocarcinoma of the appendix with metastatic cells colonising the anterior bladder wall and several colic lymph nodes. Conclusions The rarity of the appendiceal carcinoma invading the urinary bladder and its usual involvement of nearest organs and the posterior bladder wall, led us to describe this case which demonstrates the ability of the appendiceal cancer to metastasize different regions of urinary bladder.

  6. Bladder metastases of appendiceal mucinous adenocarcinoma: a case presentation

    International Nuclear Information System (INIS)

    Taverna, Gianluigi; Graziotti, Pierpaolo; Corinti, Matteo; Colombo, Piergiuseppe; Grizzi, Fabio; Severo, Mauro; Piccinelli, Alessando; Giusti, Guido; Benetti, Alessio; Zucali, Paolo A

    2010-01-01

    Appendiceal adenocarcinoma is rare with a frequency of 0.08% of all surgically removed appendices. Few cases of appendiceal carcinoma infiltrating the bladder wall for spatial contiguity have been documented. A case is reported of a 45-years old woman with mucinous cystadenocarcinoma of the appendix with bladder metastasis. Although ultrasonography and voided urinary cytology were negative, abdomen computed tomography (CT) scan and cystoscopy and subsequent pathological examination revealed a mass exclusively located in the anterior wall of the bladder. Histopathology of the transurethral bladder resection revealed a bladder adenocarcinoma [6 cm (at the maximum diameter) × 2,5 cm; approximate weight: 10 gr] with focal mucinous aspects penetrating the muscle and perivisceral fat. Laparotomy evidenced the presence of a solid mass of the appendix (2,5 cm × 3 cm × 2 cm) extending to the loco-regional lymph nodes. Appendectomy and right hemicolectomy, linfoadenectomy and partial cystectomy were performed. The subsequent pathological examination revealed a mucinous cystadenocarcinoma of the appendix with metastatic cells colonising the anterior bladder wall and several colic lymph nodes. The rarity of the appendiceal carcinoma invading the urinary bladder and its usual involvement of nearest organs and the posterior bladder wall, led us to describe this case which demonstrates the ability of the appendiceal cancer to metastasize different regions of urinary bladder

  7. Evaluation of severe accident risks, Grand Gulf, Unit 1: Appendices

    International Nuclear Information System (INIS)

    Brown, T.D.; Breeding, R.J.; Jow, H.N.; Higgins, S.J.; Shiver, A.W.; Helton, J.C.; Amos, C.N.

    1990-12-01

    In support of the Nuclear Regulatory Commission's (NRC's) assessment of the risk from severe accidents at commercial nuclear power plants in the US report in NUREG-1150, the Severe Accident Risk Reduction Program (SARRP) has completed a revised calculation of the risk to the general public from severe accidents at the Grand Gulf Nuclear Station, Unit 1. This power plant, located in Port Gibson, Mississippi, is operated by the System Energy Resources, Inc. (SERI). The emphasis in this risk analysis was not on determining a ''so-called'' point estimate of risk. Rather, it was to determine the distribution of risk, and to discover the uncertainties that account for the breadth of this distribution. Off-site risk initiated by events internal to the power plant was assessed. This document provides Appendices A through E for this report. Topics included are, respectively: supporting information for the accident progression analysis; supporting information for the source term analysis; supporting information for the consequence analysis; risk results; and sampling information

  8. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  9. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  10. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  11. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  12. Remote-handled transuranic system assessment appendices. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives.

  13. Transmission System Vegetation Management Program. Draft Environmental Impact Statement - Appendices

    International Nuclear Information System (INIS)

    1999-01-01

    The appendices covered in this Draft Environmental Impact Statement are: Appendix A--Public involvement; Appendix B--Biological weed control agents; Appendix C--BPA herbicide licensing plan; Appendix D--Sample educational information; Appendix E--Clearance criteria; Appendix F--USFS mitigation measures and background; Appendix G--BLM mitigation measures and background and Appendix H--Pesticide fact sheets

  14. Appendices for: Improper Signaling in Two-Path Relay Channels

    KAUST Repository

    Gaafar, Mohamed

    2016-12-01

    This document contains the appendices for the work in “Improper Signaling in Two-Path Relay Channels,” which is submitted to 2017 IEEE International Conference on Communications (ICC) Workshop on Full-Duplex Communications for Future Wireless Networks, Paris, France.

  15. Appendiceal Endometriosis: A case Report and Literature Review ...

    African Journals Online (AJOL)

    Appendiceal endometriosis is a very rare and usually asymptomatic condiction, but can result in severe complications such as intestinal perforation, massive gastrointestinal bleeding or intussusception. We report a case of endometriosis of the appendix presenting as acute appendicitis. The patient was a 36 year old ...

  16. Cerebral Metastasis from a Previously Undiagnosed Appendiceal Adenocarcinoma

    Directory of Open Access Journals (Sweden)

    Antonio Biroli

    2012-01-01

    Full Text Available Brain metastases arise in 10%–40% of all cancer patients. Up to one third of the patients do not have previous cancer history. We report a case of a 67-years-old male patient who presented with confusion, tremor, and apraxia. A brain MRI revealed an isolated right temporal lobe lesion. A thorax-abdomen-pelvis CT scan showed no primary lesion. The patient underwent a craniotomy with gross-total resection. Histopathology revealed an intestinal-type adenocarcinoma. A colonoscopy found no primary lesion, but a PET-CT scan showed elevated FDG uptake in the appendiceal nodule. A right hemicolectomy was performed, and the specimen showed a moderately differentiated mucinous appendiceal adenocarcinoma. Whole brain radiotherapy was administrated. A subsequent thorax-abdomen CT scan revealed multiple lung and hepatic metastasis. Seven months later, the patient died of disease progression. In cases of undiagnosed primary lesions, patients present in better general condition, but overall survival does not change. Eventual identification of the primary tumor does not affect survival. PET/CT might be a helpful tool in detecting lesions of the appendiceal region. To the best of our knowledge, such a case was never reported in the literature, and an appendiceal malignancy should be suspected in patients with brain metastasis from an undiagnosed primary tumor.

  17. Theoretical studies of fusion physics. Volume II. Appendices. Final report

    International Nuclear Information System (INIS)

    1983-01-01

    The following appendices are given: (1) absorption of waves near the cyclotron frequency by relativistic electrons in EBT, (2) power balance in a stable, adiabatic hot electron annulus, (3) whistler instability in a relativistic electron annulus, and (4) adiabatic limit on electron temperature in the EBT annulus

  18. Appendices for: Improper Signaling in Two-Path Relay Channels

    KAUST Repository

    Gaafar, Mohamed; Amin, Osama; Schaefer, Rafael F.; Alouini, Mohamed-Slim

    2016-01-01

    This document contains the appendices for the work in “Improper Signaling in Two-Path Relay Channels,” which is submitted to 2017 IEEE International Conference on Communications (ICC) Workshop on Full-Duplex Communications for Future Wireless Networks, Paris, France.

  19. The environmental energy sector programme. Poland: Appendices to feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The appendices contain Energy Law, Act of 10 April 1997 and also more specific details from the feasibility study for the procurement of a financial solution to the modernisation of the combined heat and power plant in the city of Zielona Gora, Poland. (EHS)

  20. Large scale solar district heating. Evaluation, modelling and designing - Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Heller, A.

    2000-07-01

    The appendices present the following: A) Cad-drawing of the Marstal CSHP design. B) Key values - large-scale solar heating in Denmark. C) Monitoring - a system description. D) WMO-classification of pyranometers (solarimeters). E) The computer simulation model in TRNSYS. F) Selected papers from the author. (EHS)

  1. Remote-handled transuranic system assessment appendices. Volume 2

    International Nuclear Information System (INIS)

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives

  2. Inflammatory markers in blood and serum tumor markers predict survival in patients with epithelial appendiceal neoplasms undergoing surgical cytoreduction and intraperitoneal chemotherapy.

    Science.gov (United States)

    Chua, Terence C; Chong, Chanel H; Liauw, Winston; Zhao, Jing; Morris, David L

    2012-08-01

    The study examines the role inflammatory and tumor markers as biomarkers to preoperatively predict outcome in patients with epithelial appendiceal neoplasm undergoing cytoreduction and intraperitoneal chemotherapy. Associations between baseline variables, tumor markers [CEA (carcinoembyronic antigen], CA125, CA199), inflammatory markers including neutrophils-lymphocyte ratio (NLR), platelet-lymphocyte ratio (PLR), and C-reactive protein (CRP) with progression-free survival (PFS) and overall survival (OS) were examined in patients undergoing surgical cytoreduction and intraperitoneal chemotherapy for epithelial appendiceal neoplasm. A total of 174 patients with epithelial appendiceal neoplasm (low-grade pseudomyxoma, n = 117; appendiceal cancer, n = 57) underwent cytoreduction. On univariate analysis, all 3 inflammatory and tumor markers predicted for both PFS and OS, respectively; NLR ≤ 2.6 (P = 0.01, P = 0.002), PLR ≤ 166 (P = 0.006, P = 0.016), CRP ≤ 12.5 (P = 0.001, P = 0.008), CEA (P 37 (P = 0.003), and a CRP > 12.5 (P = 0.013). A higher peritoneal cancer index (PCI > 24) was associated with elevation in CEA > 12, CA125 > 39, CA199 > 37, PLR > 166 and CRP > 12. The tumor histologic subtype was associated with CA 199 levels. The results from this investigation suggest that preoperative inflammatory markers in blood and serologic tumor markers may predict outcomes and are associated with tumor biology in patients with epithelial appendiceal neoplasm undergoing cytoreduction and intraperitoneal chemotherapy treatment.

  3. Energy conservation in existing office buildings. Appendices to report, Phase I, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-01

    A blank form of Questionnaire No. 1 is first presented, followed by data compiled from that questionnaire. Then data are presented on the analyses of the 436 buildings, statistical validation for selection of the 44 building sample, and some examples of the matching buildings for the 44 building sample. Questionnaire No. 2 is then given, followed by additional data collected from the study concerning energy consumption and building characteristics. To complete the appendices, a simulation of a typical building and a hypothetical building is included. (MCW)

  4. Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Appendices

    International Nuclear Information System (INIS)

    Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

    1982-03-01

    Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and EMTOMB (entombment). The study results are presented in two volumes. Volume 2 (Appendices) contains the detailed data that support the results given in Volume 1, including unit-component data

  5. Research reactor core conversion guidebook. V.2: Analysis (Appendices A-F)

    International Nuclear Information System (INIS)

    1992-04-01

    Volume 2 consists of detailed Appendices, covering safety analyses for generic 10 MW reactor, safety analysis - probabilistic methods, methods for preventing LOCA, radiological consequence analyses, examples of safety report amendments and safety specifications. Included in Volume 2 are example analyses for cores with with highly enriched uranium and low enriched uranium fuels showing differences that can be expected in the safety parameters and radiological consequences of postulated accidents. There are seven examples of licensing documents related to core conversion and two examples of methods for determining power limits for safety specifications in the document. Refs, figs, bibliographies and tabs

  6. Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

    1982-03-01

    Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and EMTOMB (entombment). The study results are presented in two volumes. Volume 2 (Appendices) contains the detailed data that support the results given in Volume 1, including unit-component data.

  7. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  8. Predictors of appendiceal perforation in an equal access system.

    Science.gov (United States)

    Walker, Avery; Hatch, Quinton; Drake, Thurston; Nelson, Daniel W; Fitzpatrick, Emilie; Bingham, Jason; Black, George; Maykel, Justin A; Steele, Scott R

    2014-07-01

    Discrepancies in socioeconomic factors have been associated with higher rates of perforated appendicitis. As an equal-access health care system theoretically removes these barriers, we aimed to determine if remaining differences in demographics, education, and pay result in disparate outcomes in the rate of perforated appendicitis. All patients undergoing appendectomy for acute appendicitis (November 2004-October 2009) at a tertiary care equal access institution were categorized by demographics and perioperative data. Rank of the sponsor was used as a surrogate for economic status. A multivariate logistic regression model was performed to determine patient and clinical characteristics associated with perforated appendicitis. A total of 680 patients (mean age 30±16 y; 37% female) were included. The majority were Caucasian (56.4% [n=384]; African Americans 5.6% [n=38]; Asians 1.9% [n=13]; and other 48.9% [n=245]) and enlisted (87.2%). Overall, 6.4% presented with perforation, with rates of 6.6%, 5.8%, and 6.7% (P=0.96) for officers, enlisted soldiers, and contractors, respectively. There was no difference in perforation when stratified by junior or senior status for either officers or enlisted (9.3% junior versus 4.40% senior officers, P=0.273; 6.60% junior versus 5.50% senior enlisted, P=0.369). On multivariate analysis, parameters such as leukocytosis and temperature, as well as race and rank were not associated with perforation (P=0.7). Only age had a correlation, with individuals aged 66-75 y having higher perforation rates (odds ratio, 1.04; 95% confidence interval, 1.02-1.05; P<0.001). In an equal-access health care system, older age, not socioeconomic factors, correlated with increased appendiceal perforation rates. Published by Elsevier Inc.

  9. Alternative fuels for vehicles fleet demonstration program. Final report, volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Alternative Fuels for Vehicles Fleet Demonstration Program (AFV-FDP) was a multiyear effort to collect technical data for use in determining the costs and benefits of alternative-fuel vehicles (AFVs) in typical applications in New York State. This report, Volume 2, includes 13 appendices to Volume 1 that expand upon issues raised therein. Volume 1 provides: (1) Information about the purpose and scope of the AFV-FDP; (2) A summary of AFV-FDP findings organized on the basis of vehicle type and fuel type; (3) A short review of the status of AFV technology development, including examples of companies in the State that are active in developing AFVs and AFV components; and (4) A brief overview of the status of AFV deployment in the State. Volume 3 provides expanded reporting of AFV-FDP technical details, including the complete texts of the brochure Garage Guidelines for Alternative Fuels and the technical report Fleet Experience Survey Report, plus an extensive glossary of AFV terminology. The appendices cover a wide range of issues including: emissions regulations in New York State; production and health effects of ozone; vehicle emissions and control systems; emissions from heavy-duty engines; reformulated gasoline; greenhouse gases; production and characteristics of alternative fuels; the Energy Policy Act of 1992; the Clean Fuel Fleet Program; garage design guidelines for alternative fuels; surveys of fleet managers using alternative fuels; taxes on conventional and alternative fuels; and zero-emission vehicle technology.

  10. Potential actionable targets in appendiceal cancer detected by immunohistochemistry, fluorescent in situ hybridization, and mutational analysis

    Science.gov (United States)

    Millis, Sherri Z.; Kimbrough, Jeffery; Doll, Nancy; Von Hoff, Daniel; Ramanathan, Ramesh K.

    2017-01-01

    Background Appendiceal cancers are rare and consist of carcinoid, mucocele, pseudomyxoma peritonei (PMP), goblet cell carcinoma, lymphoma, and adenocarcinoma histologies. Current treatment involves surgical resection or debulking, but no standard exists for adjuvant chemotherapy or treatment for metastatic disease. Methods Samples were identified from approximately 60,000 global tumors analyzed at a referral molecular profiling CLIA-certified laboratory. A total of 588 samples with appendix primary tumor sites were identified (male/female ratio of 2:3; mean age =55). Sixty-two percent of samples were adenocarcinomas (used for analysis); the rest consisted of 9% goblet cell, 15% mucinous; 6% pseudomyxoma, and less than 5% carcinoids and 2% neuroendocrine. Tests included sequencing [Sanger, next generation sequencing (NGS)], protein expression/immunohistochemistry (IHC), and gene amplification [fluorescent in situ hybridization (FISH) or CISH]. Results Profiling across all appendiceal cancer histological subtypes for IHC revealed: 97% BRCP, 81% MRP1, 81% COX-2, 71% MGMT, 56% TOPO1, 5% PTEN, 52% EGFR, 40% ERCC1, 38% SPARC, 35% PDGFR, 35% TOPO2A, 25% RRM1, 21% TS, 16% cKIT, and 12% for TLE3. NGS revealed mutations in the following genes: 50.4% KRAS, 21.9% P53, 17.6% GNAS, 16.5% SMAD4, 10% APC, 7.5% ATM, 5.5% PIK3CA, 5.0% FBXW7, and 1.8% BRAF. Conclusions Appendiceal cancers show considerable heterogeneity with high levels of drug resistance proteins (BCRP and MRP1), which highlight the difficulty in treating these tumors and suggest an individualized approach to treatment. The incidence of low TS (79%) could be used as a backbone of therapy (using inhibitors such as 5FU/capecitabine or newer agents). Therapeutic options includeTOPO1 inhibitors (irinotecan/topotecan), EGFR inhibitors (erlotinib, cetuximab), PDGFR antagonists (regorafenib, axitinib), MGMT (temozolomide). Clinical trials targeting pathways involving KRAS, p53, GNAS, SMAD4, APC, ATM, PIK3CA, FBXW7, and

  11. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  12. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 5. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-01

    Volume V of the five-volume report consists of appendices, which provide supplementary information, with emphasis on characteristics of geologic formations that might be used for final storage or disposal. Appendix titles are: selected glossary; conversion factors; geologic isolation, including, (a) site selection factors for repositories of wastes in geologic media, (b) rock types--geologic occurrence, (c) glossary of geohydrologic terms, and (d) 217 references; the ocean floor; and, government regulations pertaining to the management of radioactive materials. (JGB)

  13. Report to Congress on the feasibility of establishing a heating oil component to the Strategic Petroleum Reserve. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    Nine appendices to the main report are included in this volume. They are: Northeastern US distillate supply systems; New England fuel oil storage capacities and inventories; Characteristics of the northeast natural gas market; Documentation of statistical models and calculation of benefits; Regional product reserve study; Other countries` experience with refined product storage; Global refining supply demand appraisal; Summary of federal authorities relevant to the establishment of petroleum product reserves; Product stability and turnover requirements.

  14. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 5. Appendices

    International Nuclear Information System (INIS)

    1976-05-01

    Volume V of the five-volume report consists of appendices, which provide supplementary information, with emphasis on characteristics of geologic formations that might be used for final storage or disposal. Appendix titles are: selected glossary; conversion factors; geologic isolation, including, (a) site selection factors for repositories of wastes in geologic media, (b) rock types--geologic occurrence, (c) glossary of geohydrologic terms, and (d) 217 references; the ocean floor; and, government regulations pertaining to the management of radioactive materials

  15. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  16. Residential photovoltaic module and array requirement study. Low-Cost Solar Array Project engineering area. Final report appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    This volume contains the appendices to a study to identify design requirements for photovoltaic modules and arrays used in residential applications. Appendices include: (1) codes, standards, and manuals of accepted practice-definition and importance; (2) regional code variations-impact; (3) model and city codes-review; (4) National Electric Code (NEC)-review; (5) types of standards-definition and importance; (6) federal standards-review; (7) standards review method; (8) manuals of accepted practice; (9) codes and referenced standards-summary; (10) public safety testing laboratories; (11) insurance review; (12) studies approach; (13) mounting configurations; (14) module/panel size and shape cost analysis; (15) grounding, wiring, terminal and voltage studies; (16) array installation cost summary; (17) photovoltaic shingle/module comparison; (18) retrofit application; (19) residential photovoltaic module performance criteria; (20) critique of JPL's solar cell module design and test specifications for residential applications; and (21) CSI format specification. (WHK)

  17. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  18. Analysis of some nuclear waste management options. Volume II. Appendices

    International Nuclear Information System (INIS)

    Berman, L.E.; Ensminger, D.A.; Giuffre, M.S.; Koplik, C.M.; Oston, S.G.; Pollak, G.D.; Ross, B.I.

    1978-01-01

    This report describes risk analyses performed on that portion of a nuclear fuel cycle which begins following solidification of high-level waste. Risks associated with handling, interim storage and transportation of the waste are assessed, as well as the long term implications of disposal in deep mined cavities. The risk is expressed in terms of expected dose to the general population and peak dose to individuals in the population. This volume consists of appendices which provide technical details of the work performed

  19. Analysis of some nuclear waste management options. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Berman, L.E.; Ensminger, D.A.; Giuffre, M.S.; Koplik, C.M.; Oston, S.G.; Pollak, G.D.; Ross, B.I.

    1978-10-10

    This report describes risk analyses performed on that portion of a nuclear fuel cycle which begins following solidification of high-level waste. Risks associated with handling, interim storage and transportation of the waste are assessed, as well as the long term implications of disposal in deep mined cavities. The risk is expressed in terms of expected dose to the general population and peak dose to individuals in the population. This volume consists of appendices which provide technical details of the work performed.

  20. INEL environmental characterization report. Volume II. Appendices A-D

    International Nuclear Information System (INIS)

    1984-09-01

    This volume contains appendices: (1) a socioeconomic data base for southeastern Idaho; (2) an ecological characterization of the INEL; (3) site-specific climatology summary, NPR primary and alternate sites; (4) NPR site borehole completion; (5) an investigation of the principal lineament at the INEL; (6) an investigation of Clay Butte, Idaho; (7) Arco and Howe fault study; (8) seismology of the INEL; (9) geologic map of the INEL; and (1) geologic ages of the INEL

  1. Appendiceal Mucocele in an Elderly Patient: How Much Surgery

    Directory of Open Access Journals (Sweden)

    C. Kim-Fuchs

    2011-09-01

    Full Text Available Appendiceal mucoceles are rare cystic lesions with an incidence of 0.3–0.7% of all appendectomies. They are divided into four subgroups according to their histology. Even though the symptoms may vary – depending on the level of complication – from right lower quadrant pain, signs of intussusception, gastrointestinal bleeding to an acute abdomen with sepsis, most mucoceles are asymptomatic and found incidentally. We present the case of a 70-year-old patient with an incidentally found appendiceal mucocele. He was seen at the hospital for backache. The CT scan showed a vertebral fracture and a 7-cm appendiceal mass. A preoperative colonoscopy displayed several synchronous adenomas in the transverse and left colon with high-grade dysplasia. In order to lower the cancer risk of this patient, we performed a subtotal colectomy. The appendiceal mass showed no histopathological evidence of malignancy and no sign of perforation. The follow-up was therefore limited to 2 months. In this case, appendectomy would have been sufficient to treat the mucocele alone. The synchronous high-grade dysplastic adenomas were detected in the preoperative colonoscopy and determined the therapeutic approach. Generally, in the presence of positive lymph nodes, a right colectomy is the treatment of choice. In the histological presence of mucinous peritoneal carcinomatosis, cytoreductive surgery with hyperthermic intraperitoneal chemotherapy is indicated. In conclusion, mucoceles of the appendix are detected with high sensitivity by CT scan. If there is no evidence of synchronous tumor preoperatively and no peritoneal spillage, invasion or positive sentinel lymph nodes during surgery, a mucocele is adequately treated by appendectomy.

  2. Data package for the Low-Level Waste Disposal Development and Demonstration Program environmental impact statement: Volume 2, Appendices E-O

    Energy Technology Data Exchange (ETDEWEB)

    Ketelle, R.H.

    1988-09-01

    This volume contains 11 appendices to the main document in Volume 1. Topics in Volume 2 include hydrologic data for a proposed solid waste storage area, soil characterizations, well logs, surface water discharge data, water quality data, atmospheric precipitation and stream flow, a small mammal survey, and general ecological information. (TEM)

  3. Low-grade appendiceal mucinous neoplasm mimicking an adnexal mass.

    Science.gov (United States)

    Cristian, Daniel Alin; Grama, Florin Andrei; Becheanu, Gabriel; Pop, Anamaria; Popa, Ileana; Şurlin, Valeriu; Stănilescu, Sorin; Bratu, Ana Magdalena; Burcoş, Traean

    2015-01-01

    We present a rare case of malignant epithelial neoplasm of the appendix, an uncommon disorder encountered in clinical practice, which poses a variety of diagnostic and therapeutic challenges. We report a particular case in which the appendix was abnormally located in the pelvis, mimicking an adnexal mass. Therefore, it was difficult to make the preoperative diagnosis on clinical examination, imaging studies and laboratory tests and we discovered the lesion during the diagnostic laparoscopy. No lymphadenopathy or mucinous ascites were found. The case was completely handled via the laparoscopic approach keeping the appendix intact during the operation. The frozen section, the detailed histopathology overview as well as multiple immunostaining with a complex panel of markers report diagnosed a low-grade appendiceal mucinous neoplasm (LAMN) with no invasion of the wall. No adjuvant therapy was considered needed. At a one-year follow-up oncological assessment, the patient was free of disease. In women with cystic mass in the right iliac fossa an appendiceal mucocele should be considered in the differential diagnosis. Laparoscopic appendectomy can represent an adequate operation for the appendiceal mucinous neoplasm if the histological report is clear and surgical precautionary measures are taken.

  4. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  5. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  6. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  7. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  8. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  9. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  10. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  11. Tradeable emission permits regulations in the presence of imperfectly competitive product markets. Welfare implications

    International Nuclear Information System (INIS)

    Sartzetakis, E.S.

    1997-01-01

    In the present paper, we analyse the interaction of a competitive market for emission permits with an oligopolistic product market. It is well known that a competitive permits market achieves the cost minimizing distribution of abatement effort among the polluting firms for a given reduction in emissions. However, when the product market is oligopolistic, it may redistribute production inefficiently among firms. It has been suggested that this inefficiency can outweigh the gains obtained from using emission permits instead of command and control. Although this argument is clearly correct under full information, it is shown in the present paper that it reverses under incomplete information. In particular, it is shown that when tradeable emission permits are specified according to the standard textbook example, they yield higher social welfare than the command and control regulation. 1 fig., 2 appendices, 11 refs

  12. Review of energy policy. Vol. 1. A discussion paper; Vol. 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Following the accident at the Chernobyl reactor in April 1986, the 1986 Annual Delegate Conference of the Institution of Professional Civil Servants set up a Working Party to review the Institution's energy policy, including safety and environmental factors. The review is presented in two volumes as the basis for discussion by the members. Volume I is the main report. Section A, the introduction, includes a summary of the detailed conclusions and recommendations of the Working Party. Section B (chapters 4-12) concerns all aspects of nuclear power including fuel reprocessing and waste management. Section C (chapters 13-16) considers the alternatives to nuclear power and Section D (chapters 17-24) looks at the economic and social aspects of energy policy. The appendices, which contain the detailed technical and source information used by the Working Party in reaching its conclusions, are printed separately in Volume II.

  13. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  14. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  15. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 2, contains Appendices B1, C1, and C2. These appendices describe the surface hydrology of the area, provide a description of the physical and chemical characteristics of wastes to be placed in WIPP, and outline a waste analysis plan which gives an overview of the total waste inventory planned for WIPP. 34 refs., 107 figs., 27 tabs

  16. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 4, contains Appendices C3, C4, and D1--D10. These appendices cover information on environmental impacts, site characterization, geology and hydrology of the area, monitoring of the environment, compatibility of waste forms and containers, and removal of volatile organic compounds (VOC)

  17. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 5, contains Appendices E1, H1, I1--3, K1, K2, and L1. These appendices cover a RCRA ground water monitoring waiver, a list of job titles, the operational closure plan, the waste retrieval plan for wastes placed during the test phase, and listings of agreements between WIPP, DOE, and various state and federal agencies. 91 refs., 21 figs., 3 tabs

  18. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  19. Aircraft Fire Sentry. Volume 2. Appendices

    Science.gov (United States)

    1993-01-01

    including New Mexico Engineering Research Institute (NMERI), National Institute of Standards and Technology (NIST), Wright-Patterson AFB, and AFESC at...Installation Remove the mounting bracket from the smoke alarm by depresing the release tab marked "PRESS" (see Figure 1. pg. 5). Pivot the bracket awey from and

  20. Survey of strong motion earthquake effects on thermal power plants in California with emphasis on piping systems. Volume 2, Appendices

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-11-01

    Volume 2 of the ''Survey of Strong Motion Earthquake Effects on Thermal Power Plants in California with Emphasis on Piping Systems'' contains Appendices which detail the detail design and seismic response of several power plants subjected to strong motion earthquakes. The particular plants considered include the Ormond Beach, Long Beach and Seal Beach, Burbank, El Centro, Glendale, Humboldt Bay, Kem Valley, Pasadena and Valley power plants. Included is a typical power plant piping specification and photographs of typical power plant piping specification and photographs of typical piping and support installations for the plants surveyed. Detailed piping support spacing data are also included

  1. DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    This volume contains the appendices that provide additional environment, safety, and health (ES and H) information to complement Volume 1 of this Standard. Appendix A provides a set of candidate DOE ES and H directives and external regulations, organized by hazard types that may be used to identify potentially applicable directives to a specific facility disposition activity. Appendix B offers examples and lessons learned that illustrate implementation of ES and H approaches discussed in Section 3 of Volume 1. Appendix C contains ISMS performance expectations to guide a project team in developing and implementing an effective ISMS and in developing specific performance criteria for use in facility disposition. Appendix D provides guidance for identifying potential Applicable or Relevant and Appropriate Requirements (ARARs) when decommissioning facilities fall under the Comprehensive Environmental Response, Compensation, Liability Act (CERCLA) process. Appendix E discusses ES and H considerations for dispositioning facilities by privatization. Appendix F is an overview of the WSS process. Appendix G provides a copy of two DOE Office of Nuclear Safety Policy and Standards memoranda that form the bases for some of the guidance discussed within the Standard. Appendix H gives information on available hazard analysis techniques and references. Appendix I provides a supplemental discussion to Sections 3.3.4, Hazard Baseline Documentation, and 3.3.6, Environmental Permits. Appendix J presents a sample readiness evaluation checklist.

  2. DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1998-05-01

    This volume contains the appendices that provide additional environment, safety, and health (ES and H) information to complement Volume 1 of this Standard. Appendix A provides a set of candidate DOE ES and H directives and external regulations, organized by hazard types that may be used to identify potentially applicable directives to a specific facility disposition activity. Appendix B offers examples and lessons learned that illustrate implementation of ES and H approaches discussed in Section 3 of Volume 1. Appendix C contains ISMS performance expectations to guide a project team in developing and implementing an effective ISMS and in developing specific performance criteria for use in facility disposition. Appendix D provides guidance for identifying potential Applicable or Relevant and Appropriate Requirements (ARARs) when decommissioning facilities fall under the Comprehensive Environmental Response, Compensation, Liability Act (CERCLA) process. Appendix E discusses ES and H considerations for dispositioning facilities by privatization. Appendix F is an overview of the WSS process. Appendix G provides a copy of two DOE Office of Nuclear Safety Policy and Standards memoranda that form the bases for some of the guidance discussed within the Standard. Appendix H gives information on available hazard analysis techniques and references. Appendix I provides a supplemental discussion to Sections 3.3.4, Hazard Baseline Documentation, and 3.3.6, Environmental Permits. Appendix J presents a sample readiness evaluation checklist

  3. C-reactive Protein may Predict the Recurrence of Appendicitis in Children Formerly with Appendiceal Mass after Successful Non-operative Treatment.

    Science.gov (United States)

    Chang, Yi-Jung; Chao, Hsun-Chin; Chen, Chyi-Liang; Chen, Shin-Yann; Yan, Dah-Chin; Tsai, Ming-Han

    2017-08-01

    This study identified factors associated with the recurrence of appendicitis in children with appendiceal masses after successful nonsurgical treatment. In this retrospective study, children who were diagnosed as having appendiceal masses after undergoing conservative treatment between 2000 and 2014 were enrolled and the medical records of those who did not undergo an interval appendectomy were reviewed. The clinical features and outcomes of patients with and those without recurrent appendicitis were compared. Regression analysis was used to identify risk factors of appendicitis recurrence. Seventy patients were included and successfully discharged after receiving nonsurgical treatment for appendiceal masses. Of the patients, 35 (50.0%) developed recurrent appendicitis and 85.7% (30/35) recurrences developed within 3 months. Multivariate analyses showed that patients with a higher serum C-reactive protein (CRP) level and peritonitis more frequently developed recurrence. The appendicitis recurrence rate was significantly higher in the patients with CRP levels of ≥103 mg/L with an odds ratio of 16.9 or in those with peritonitis with an odds ratio of 4.9. Children with appendiceal masses who develop peritonitis or have CRP levels of ≥103 mg/L have a higher recurrence rate of appendicitis and should undergo an interval appendectomy. Copyright © 2017. Published by Elsevier B.V.

  4. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  5. International photovoltaic program. Volume 2: Appendices

    Science.gov (United States)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-01-01

    The results of analyses conducted in preparation of an international photovoltaic marketing plan are summarized. Included are compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about the how US government actions could affect this market;international financing issues; and information on issues affecting foreign policy and developing countries.

  6. Appendiceal and ovarian Burkitt's lymphoma presenting as acute appendicitis

    Directory of Open Access Journals (Sweden)

    Donovan Hui

    2018-05-01

    Full Text Available Burkitt's lymphoma is an extremely aggressive B-cell non-Hodgkin lymphoma. Patients with the sporadic form of Burkitt's lymphoma typically present with a rapidly growing abdominal mass, pain and distension. Involvement of either the appendix and/or ovaries in females is a rare manifestation of the disease. We present an unusual case of a 13 year old girl with appendiceal and ovarian Burkitt's lymphoma presenting with signs of acute appendicitis. This case demonstrates the potential for secondary involvement of the appendix and/or ovaries from Burkitt's lymphoma as well as the importance of the histopathology. Keywords: Appendicitis, Appendix, Burkitt's lymphoma, Lymphoma, Ovarian tumor

  7. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  8. Significance of appendiceal thickening in association with typhlitis in pediatric oncology patients

    International Nuclear Information System (INIS)

    McCarville, M.B.; Thompson, J.; Adelman, C.S.; Lee, M.O.; Li, C.; Alsammarae, D.; Rao, B.N.; May, M.V.; Jones, S.C.; Sandlund, J.T.

    2004-01-01

    Background: The management of pediatric oncology patients with imaging evidence of appendiceal thickening is complex because they are generally poor surgical candidates and often have confounding clinical findings. Objective: We sought to determine the significance of appendiceal thickening in pediatric oncology patients who also had typhlitis. Specifically, we evaluated the impact of this finding on the duration of typhlitis, its clinical management, and outcome. Materials and methods: From a previous review of the management of typhlitis in 90 children with cancer at our institution, we identified 4 with imaging evidence of appendiceal thickening. We compared colonic wall measurements, duration of typhlitis symptoms, management, and outcome of patients with appendiceal thickening and typhlitis to patients with typhlitis alone. Results: There was no significant difference in duration of typhlitis symptoms between patients with typhlitis only (15.6 ± 1.2 days) and those with typhlitis and appendiceal thickening (14.5 ± 5.8 days; P = 0.9). Two patients with appendiceal thickening required surgical treatment for ischemic bowel, and two were treated medically. Only one patient in the typhlitis without appendiceal thickening group required surgical intervention. There were no deaths in children with appendiceal thickening; two patients died of complications of typhlitis alone. (orig.)

  9. Research reactor core conversion guidebook. V. 4: Fuels (Appendices I-K)

    International Nuclear Information System (INIS)

    1992-04-01

    Volume 4 consists of detailed Appendices I-K, which contain useful information on the properties, irradiation testing, and specifications and inspection procedures for fuels with reduced uranium enrichments. Summaries of these appendices can be found in Chapters 9-11 of Volume 1 of this guidebook. Refs, figs, tabs and samples

  10. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  11. US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Black, S.C.; Glines, W.M.; Townsend, Y.E.

    1994-09-01

    This report is comprised of appendices which support monitoring and surveillance on and around the Nevada Test Site (NTS) during 1993. Appendix A contains onsite Pu-238, gross beta, and gamma-emitting radionuclides in air. Appendix B contains onsite tritium in air. Appendix C contains onsite Pu-238, Sr-90, gross alpha and beta, gamma-emitting radionuclides, Ra-226, Ra-228 and tritium in water. A summary of 1993 results of offsite radiological monitoring is included in Appendix D. Appendix E contains radioactive noble gases in air onsite. Appendix F contains onsite thermoluminescent dosimeter data. Historical trends in onsite thermoluminescent dosimeter data are contained in Appendix G. Appendix H summarizes 1993 compliance at the DOE/NV NTS and non-NTS facilities. Appendix I summarizes the 1993 results of non radiological monitoring.

  12. Measurement of Lake Roosevelt biota in relation to reservoir operations. Appendices 1991

    International Nuclear Information System (INIS)

    Griffith, J.R.; McDowell, A.C.; Scholz, A.T.

    1991-01-01

    This report consists of appendices A-F containing the biological data which were collected from Lake Roosevelt, Washington. The data are to be used in the design of a computer model that would predict biological responses of reservoir operations as part of the System Operation Review program. Major components of the model included: Quantification of impacts to phytoplankton, zooplanktons, benthic invertebrates, and fish caused by reservoir drawdowns and low water retention times; quantification of number, distribution, and use of fish food organisms in the reservoir by season; determination of seasonal growth of fish species as related to reservoir operations, prey abundance and utilization; and quantification of entrainment levels of zooplankton and fish as related to reservoir operations and water retention times

  13. Severe accident risks: An assessment for five US nuclear power plants: Appendices A, B, and C

    International Nuclear Information System (INIS)

    1990-12-01

    This report summarizes an assessment of the risks from severe accidents in five commercial nuclear power plants in the United States. These risks are measured in a number of ways, including: the estimated frequencies of core damage accidents from internally initiated accidents and externally initiated accidents for two or the plants; the performance of containment structures under severe accident loadings; the potential magnitude of radionuclide release and offsite consequences of such accidents; and the overall risk (the product of accident frequencies and consequences). Supporting this summary report are a large number of reports written under contract to NRC that provide the detailed discussion of the methods used and results obtained in these risk studies. Volume 2 of this report contains three appendices, providing greater detail on the methods used, an example risk calculation, and more detailed discussion of particular technical issues found important in the risk studies

  14. US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 2: Appendices

    International Nuclear Information System (INIS)

    Black, S.C.; Glines, W.M.; Townsend, Y.E.

    1994-09-01

    This report is comprised of appendices which support monitoring and surveillance on and around the Nevada Test Site (NTS) during 1993. Appendix A contains onsite Pu-238, gross beta, and gamma-emitting radionuclides in air. Appendix B contains onsite tritium in air. Appendix C contains onsite Pu-238, Sr-90, gross alpha and beta, gamma-emitting radionuclides, Ra-226, Ra-228 and tritium in water. A summary of 1993 results of offsite radiological monitoring is included in Appendix D. Appendix E contains radioactive noble gases in air onsite. Appendix F contains onsite thermoluminescent dosimeter data. Historical trends in onsite thermoluminescent dosimeter data are contained in Appendix G. Appendix H summarizes 1993 compliance at the DOE/NV NTS and non-NTS facilities. Appendix I summarizes the 1993 results of non radiological monitoring

  15. Safety analysis report for the use of hazardous production materials in photovoltaic applications at the National Renewable Energy Laboratory. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Crandall, R.S.; Nelson, B.P.; Moskowitz, P.D.; Fthenakis, V.M.

    1992-07-01

    To ensure the continued safety of SERI`s employees, the community, and the environment, NREL commissioned an internal audit of its photovoltaic operations that used hazardous production materials (HPMS). As a result of this audit, NREL management voluntarily suspended all operations using toxic and/or pyrophoric gases. This suspension affected seven laboratories and ten individual deposition systems. These activities are located in Building 16, which has a permitted occupancy of Group B, Division 2 (B-2). NREL management decided to do the following. (1) Exclude from this SAR all operations which conformed, or could easily be made to conform, to B-2 Occupancy requirements. (2) Include in this SAR all operations that could be made to conform to B-2 Occupancy requirements with special administrative and engineering controls. (3) Move all operations that could not practically be made to conform to B-2 occupancy requirements to alternate locations. In addition to the layered set of administrative and engineering controls set forth in this SAR, a semiquantitative risk analysis was performed on 30 various accident scenarios. Twelve presented only routine risks, while 18 presented low risks. Considering the demonstrated safe operating history of NREL in general and these systems specifically, the nature of the risks identified, and the layered set of administrative and engineering controls, it is clear that this facility falls within the DOE Low Hazard Class. Each operation can restart only after it has passed an Operational Readiness Review, comparing it to the requirements of this SAR, while subsequent safety inspections will ensure future compliance. This document contains the appendices to the NREL safety analysis report.

  16. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  17. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  19. NEW CLASSIFICATION AND DIAGNOSIS OF APPENDICEAL CARCINOID TUMORS

    Directory of Open Access Journals (Sweden)

    Vuka Katić

    2012-03-01

    Full Text Available Carcinoid tumours are rare lesions that belong to the APUDoma category having the capacity of Amine Precursor Uptake and Decarboxylase. Gastrointestinal system comprises 90% of all carcinoids in the body and they are the most common type of primary malignant lesions of the appendix. New WHO classification of gastrointestinal carcinoids, diagnostic dilemmas of some carcinoid variants and, sometimes unpredictable prognosis are the reasons for the following study: clinical, macro- and microscopical as well as cytochemical and immunocytochemical examination of the vermiform appendix carcinoids, surgically removed from 16 patients. The appendectomy was induced by acute appendicitis or tumorous mass, without carcinoid syndrome. After two-day fixation in 10% formaldehyde, routinelly processed and embedded in paraffin, laboratory sections were stained with H&E, Fontana-Masson’s, Grimelius’, FIF and ABPAS methods. ABC method has been used for immunohistochemical examination. The antibodies for Chromogranin A, NSE, Synaptophysin, Cytokeratin 7, S-100 protein, Ki67 and CEA (primary antibodies and ABC (secondary antibody (Dako Kopenhagen were tested. The patients had no carcinoid syndrome. The most frequent was classic appendiceal carcinoid, well differentiated - NETG1 (8 cases, without metastases; goblet cell carcinoids were rare (3 cases, one case with liver metastases. The second case of goblet cell carcinoid was associated with cystadenoma papillare mucinosum, complicated by pseudomixoma peritonei and the third case was limited only to appendiceal wall. The patient with liver metastases died five months after appendectomy. The patient with goblet cell carcinoid associated with papillary mucinous cystadenoma and complicated by pseudomixoma peritonei had re-operation with both partial cecal and right ovarial resection, associated with washing the peritoneal cavity. The patient was feeling well during six years from the second operation. Based on our

  20. Risk-informed appendices G and E for section XI of the ASME Boiler and Pressure Vessel Code

    International Nuclear Information System (INIS)

    Carter, B; Spanner, J.; Server, W.; Gamble, R.; Bishop, B.; Palm, N.; Heinecke, C.

    2011-01-01

    Full text of publication follows: The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, contains two appendices (G and E) related to reactor pressure boundary integrity. Appendix G provides procedures for defining Service Level A and B pressure temperature limits for ferritic components in the reactor coolant pressure boundary. Recently, an alternative risk informed methodology has been developed for ASME Section XI, Appendix G. The alternative methodology provides simple procedures to define risk informed pressure temperature limits for Service Level A and B events, including leak testing and reactor start up and shut down for both pressurized water reactors (PWRs) and boiling water reactors (BWRs). Risk informed pressure temperature limits provide more operational flexibility, particularly for reactor pressure vessels (RPV) with relatively high irradiation levels and radiation sensitive materials. Appendix E of Section XI provides a methodology for assessing conditions when the Appendix G limits are exceeded. A similar risk informed methodology is being considered for Appendix E. The probabilistic fracture mechanics evaluations used to develop the risk informed relationships included appropriate material properties for the range of RPV materials in operating plants in the United States and operating history and system operational constraints in both BWRs and PWRs. The analysis results were used to define pressure temperature relationships that provide an acceptable level of risk, consistent with safety goals defined by the U.S. Nuclear Regulatory Commission. The alternative methodologies for Appendices G and E will provide greater operational flexibility, especially for Service Level A and B events that may adversely affect efficient and safe plant operation, such as low temperature over pressurization for PWRs and BWR leak testing. Overall, application of the risk informed appendices can result in increased plant

  1. Crew Exploration Vehicle (CEV) (Orion) Occupant Protection. Part 1; Appendices

    Science.gov (United States)

    Currie-Gregg, Nancy J.; Gernhardt, Michael L.; Lawrence, Charles; Somers, Jeffrey T.

    2016-01-01

    Dr. Nancy J. Currie, of the NASA Engineering and Safety Center (NESC), Chief Engineer at Johnson Space Center (JSC), requested an assessment of the Crew Exploration Vehicle (CEV) occupant protection as a result of issues identified by the Constellation Program and Orion Project. The NESC, in collaboration with the Human Research Program (HRP), investigated new methods associated with occupant protection for the Crew Exploration Vehicle (CEV), known as Orion. The primary objective of this assessment was to investigate new methods associated with occupant protection for the CEV, known as Orion, that would ensure the design provided minimal risk to the crew during nominal and contingency landings in an acceptable set of environmental and spacecraft failure conditions. This documents contains the appendices to the NESC assessment report. NASA/TM-2013-217380, Application of the Brinkley Dynamic Response Criterion to Spacecraft Transient Dynamic Events supersedes this document.

  2. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  3. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  4. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  5. Hanford Site Air Operating Permit Application Supplemental Information [Sec 1 Thru 5] Vol 1 Thru 3 Appendices A Thru C

    Energy Technology Data Exchange (ETDEWEB)

    CURN, B.L.

    2000-05-01

    This report documents radionuclide air emissions from the Hanford Site in 1998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H: ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246247, Radiation Protection - Air Emissions. The federal regulations in 40 CFR 61, Subpart H, require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1998 from Hanford Site point sources was 1.3 E-02 mrem (1.3 E-04 mSv). which is 0.13 percent of the federal standard. Chapter 246-247 of the Washington Administrative Code (WAC) requires the reporting of radionuclide emissions from all Department of Energy Hanford Site sources. The state has adopted into these regulations the 40 CFR 61 standard of 10 mrem/yr EDE. The EDE to the MEI attributable to diffuse and fugitive radionuclide air emissions from the Hanford Site in 1998 was 2.5 E-02 mrem (2.S E-04 mSv). This dose added to the dose from point sources gives a total for all sources of 3.8 E-02 mrem/yr (3.8 E-04 mSv) EDE. which is 0.38 percent of the 10 mrem/yr standard. An unplanned release on August 26, 1998, in the 300 Area of the Hanford Site resulted in a potential dose of 4.1 E-02 mrem to a hypothetical individual at the nearest point of public access to that area. This hypothetical individual was not the MEI since the wind direction on the day of the release was away from the MEI residence. The potential dose from the unplanned event was similar in magnitude to that from routine releases during 1998. Were the release from this unplanned event combined with routine releases, the total dose would be less than 1 percent of the 10 mrem/yr standard.

  6. Fuel Rod Consolidation Project: Phase 2, Final report: Volume 2, Appendices

    International Nuclear Information System (INIS)

    1987-01-01

    This document, Volume 2, provides the appendices to Volume 1 of the Fuel Rod Consolidation Project. It provides information on the following: References; Trade-off Studies; Instrument List; RAM Data; Fabrication Specifications; Software Specifications; and Design Requirements

  7. Shipping container response to severe highway and railway accident conditions: Appendices

    International Nuclear Information System (INIS)

    Fischer, L.E.; Chou, C.K.; Gerhard, M.A.; Kimura, C.Y.; Martin, R.W.; Mensing, R.W.; Mount, M.E.; Witte, M.C.

    1987-02-01

    Volume 2 contains the following appendices: Severe accident data; truck accident data; railroad accident data; highway survey data and bridge column properties; structural analysis; thermal analysis; probability estimation techniques; and benchmarking for computer codes used in impact analysis. (LN)

  8. RF model of the distribution system as a communication channel, phase 2. Volume 3: Appendices

    Science.gov (United States)

    Rustay, R. C.; Gajjar, J. T.; Rankin, R. W.; Wentz, R. C.; Wooding, R.

    1982-01-01

    Program documentation concerning the design, implementation, and verification of a computerized model for predicting the steady-state sinusoidal response of radial configured distribution feeders is presented in these appendices.

  9. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  10. Component Fragility Research Program: Phase 1, Demonstration tests: Volume 2, Appendices

    International Nuclear Information System (INIS)

    Holman, G.S.; Chou, C.K.; Shipway, G.D.; Glozman, V.

    1987-08-01

    Appendices are presented which contain information concerning: details of controller and relay installation; resonance search transmissibility plots; time-history data from runs 17, 31, 46, and 56; and response spectra from runs 17, 31, 46, and 56

  11. Low-Grade Appendiceal Mucinous Neoplasm Involving the Endometrium and Presenting with Mucinous Vaginal Discharge.

    Science.gov (United States)

    Vavinskaya, Vera; Baumgartner, Joel M; Ko, Albert; Saenz, Cheryl C; Valasek, Mark A

    2016-01-01

    Primary appendiceal mucinous lesions are uncommon and represent a spectrum from nonneoplastic mucous retention cysts to invasive adenocarcinoma. Low-grade appendiceal mucinous neoplasms (LAMNs) represent an intermediate category on this spectrum and can be classified according to whether or not they are confined to the appendix. Although LAMNs are frequently confined to the appendix, they can also spread to the peritoneum and clinically progress as pseudomyxoma peritonei (i.e., mucinous ascites). Thus, the appropriate classification of appendiceal primary neoplasia is essential for prognosis and influences clinical management. In addition, the precise classification, management, and clinical outcome of patients with disseminated peritoneal disease remain controversial. Here, we report an unusual case of LAMN with pseudomyxoma peritonei that initially presented with mucinous and bloody vaginal discharge. Pathological evaluation revealed low-grade appendiceal mucinous neoplasm with secondary involvement of the peritoneum, ovaries, and endometrial surface. Therefore, LAMN should be considered in the differential diagnosis of mucinous vaginal discharge.

  12. Low-Grade Appendiceal Mucinous Neoplasm Involving the Endometrium and Presenting with Mucinous Vaginal Discharge

    Directory of Open Access Journals (Sweden)

    Vera Vavinskaya

    2016-01-01

    Full Text Available Primary appendiceal mucinous lesions are uncommon and represent a spectrum from nonneoplastic mucous retention cysts to invasive adenocarcinoma. Low-grade appendiceal mucinous neoplasms (LAMNs represent an intermediate category on this spectrum and can be classified according to whether or not they are confined to the appendix. Although LAMNs are frequently confined to the appendix, they can also spread to the peritoneum and clinically progress as pseudomyxoma peritonei (i.e., mucinous ascites. Thus, the appropriate classification of appendiceal primary neoplasia is essential for prognosis and influences clinical management. In addition, the precise classification, management, and clinical outcome of patients with disseminated peritoneal disease remain controversial. Here, we report an unusual case of LAMN with pseudomyxoma peritonei that initially presented with mucinous and bloody vaginal discharge. Pathological evaluation revealed low-grade appendiceal mucinous neoplasm with secondary involvement of the peritoneum, ovaries, and endometrial surface. Therefore, LAMN should be considered in the differential diagnosis of mucinous vaginal discharge.

  13. Socioeconomic effects of the DOE Gas Centrifuge Enrichment Plant. Volume 2: appendices

    International Nuclear Information System (INIS)

    1979-01-01

    Volume 2 contains 18 appendices: schools; fire protection; law enforcement; water and sewer systems; solid waste; health care; transportation; recreation; labor force; economic effects; finance; school finance; bibliography; contacts; project methodology; service impacts; reference tables; and response to comments

  14. A tale of two appendices – an unexpected finding | Heetun | South ...

    African Journals Online (AJOL)

    Abstract. Anomalies of the appendix are uncommon and are usually discovered incidentally during surgery for appendicitis. We present a rare case of appendiceal duplication, which can have serious consequences if overlooked during an operation.

  15. Economic evaluation of the annual cycle energy system (ACES). Final report. Volume III, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    This volume consists of seven appendices related to ACES, the first three of which are concerned with computer programs. The appendices are entitled: (A) ACESIM: Residential Program Listing; (B) Typical Inputs and Outputs of ACESIM; (C) CACESS: Commercial Building Program Listing; (D) Typical Weather-Year Selection Requirements; (E) Building Characteristics; (F) List of Major Variables Used in the Computer Programs; and (G) Bibliography. 79 references.

  16. Low-Grade Appendiceal Mucinous Neoplasm Involving the Endometrium and Presenting with Mucinous Vaginal Discharge

    OpenAIRE

    Vavinskaya, Vera; Baumgartner, Joel M.; Ko, Albert; Saenz, Cheryl C.; Valasek, Mark A.

    2016-01-01

    Primary appendiceal mucinous lesions are uncommon and represent a spectrum from nonneoplastic mucous retention cysts to invasive adenocarcinoma. Low-grade appendiceal mucinous neoplasms (LAMNs) represent an intermediate category on this spectrum and can be classified according to whether or not they are confined to the appendix. Although LAMNs are frequently confined to the appendix, they can also spread to the peritoneum and clinically progress as pseudomyxoma peritonei (i.e., mucinous ascit...

  17. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  18. Mesh Inguinal Hernia Repair and Appendectomy in the Treatment of Amyand’s Hernia with Non-Inflamed Appendices

    Directory of Open Access Journals (Sweden)

    Emin Kose

    2017-01-01

    Full Text Available Amyand’s hernia is defined as protrusion of the vermiform appendix in an inguinal hernia sac. It is a rare entity with variable clinical presentation from normal vermiform appendix to abscess formation due to perforation of acute appendicitis. Although surgical treatment includes appendectomy and hernia repair, appendectomy in the absence of an inflamed appendix and use of a mesh in cases of appendectomy remain to be controversial. The aim of this study was to review the experience of mesh inguinal hernia repair plus appendectomy performed for Amyand’s hernia with noninflamed appendices. There were five male patients with a mean age of 42.4 ± 16.1 years in this retrospective study in which Amyand’s hernia was treated with mesh inguinal hernia repair plus appendectomy for noninflamed appendices. Patients with acute appendicitis and perforated vermiform appendix were excluded. There were four right sided and one bilateral inguinal hernia. Postoperative courses were uneventful. During the follow-up period (14.0 ± 7.7 months, there was no inguinal hernia recurrence. Mesh inguinal hernia repair with appendectomy can be performed for Amyand’s hernia in the absence of acute appendicitis. However, presence of fibrous connections between the vermiform appendix and the surrounding hernia sac may be regarded as a parameter to perform appendectomy.

  19. Subseabed disposal program annual report, January-December 1979. Volume II. Appendices (principal investigator progress reports). Part 1 of 2

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-04-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-O; Part 2 contains Appendices P-FF. Separate abstracts have been prepared of each Appendix for inclusion in the Energy Data Base

  20. Subseabed disposal program annual report, January-December 1980. Volume II. Appendices (principal investigator progress reports). Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Hinga, K.R. (ed.)

    1981-07-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-Q; Part 2 contains Appendices R-MM. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base.

  1. Subseabed disposal program annual report, January-December 1980. Volume II. Appendices (principal investigator progress reports). Part 1

    International Nuclear Information System (INIS)

    Hinga, K.R.

    1981-07-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-Q; Part 2 contains Appendices R-MM. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base

  2. Subseabed disposal program annual report, January-December 1979. Volume II. Appendices (principal investigator progress reports). Part 2 of 2

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-04-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume II, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-O; Part 2 contains Appendices P-FF. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base

  3. Safe Operation of Nuclear Power Plants. Code of Practice and Technical Appendices

    International Nuclear Information System (INIS)

    1969-01-01

    This book is in two parts. The first is a Code of Practice for the Safe Operation of Nuclear Power Plants and the second part is a compilation of technical appendices. Its object is to give information and illustrative examples that would be helpful in implementing the Code of Practice. This second part, although published under the same cover, is not part of the Code. Safe operation of a nuclear power plant postulates suitable siting and proper design, construction and management of the plant. Under the present Code of Practice for the Safe Operation of Nuclear Power Plants, those intending to operate the plant are recommended to prepare documentation which would deal with its operation and include safety analyses. The documentation in question would be reviewed by a regulatory body independent of the operating organization; operation would be authorized on the understanding that it would comply with limits and conditions designed to ensure safety. The Code may be subject to revision in the light of experience. The Appendices provide additional information together with some examples relating to certain topics dealt with in the Code; it must be emphasized that they are included as examples for information only and are not part of any recommendation. Purpose and scope: The recommendations in the Code are designed to protect the general public and the operating personnel from radiation hazards, and the Code forms part of the Agency's Safety Standards. The Code, which should be used in conjunction with the Agency's other Safety Standards, provides guidance and information to persons and authorities responsible for the operation of stationary nuclear power plants whose main function is the generation of thermal, mechanical or electrical power; it is not intended to apply to reactors used solely for experimental or research purposes. It sets forth minimum requirements which, it is believed, in the light of experience, must be met in order to achieve safe operation of a

  4. Ocean Thermal Energy Conversion (OTEC) Programmatic Environmental Analysis--Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Authors, Various

    1980-01-01

    The programmatic environmental analysis is an initial assessment of Ocean Thermal Energy Conversion (OTEC) technology considering development, demonstration and commercialization. It is concluded that the OTEC development program should continue because the development, demonstration, and commercialization on a single-plant deployment basis should not present significant environmental impacts. However, several areas within the OTEC program require further investigation in order to assess the potential for environmental impacts from OTEC operation, particularly in large-scale deployments and in defining alternatives to closed-cycle biofouling control: (1) Larger-scale deployments of OTEC clusters or parks require further investigations in order to assess optimal platform siting distances necessary to minimize adverse environmental impacts. (2) The deployment and operation of the preoperational platform (OTEC-1) and future demonstration platforms must be carefully monitored to refine environmental assessment predictions, and to provide design modifications which may mitigate or reduce environmental impacts for larger-scale operations. These platforms will provide a valuable opportunity to fully evaluate the intake and discharge configurations, biofouling control methods, and both short-term and long-term environmental effects associated with platform operations. (3) Successful development of OTEC technology to use the maximal resource capabilities and to minimize environmental effects will require a concerted environmental management program, encompassing many different disciplines and environmental specialties. This volume contains these appendices: Appendix A -- Deployment Scenario; Appendix B -- OTEC Regional Characterization; and Appendix C -- Impact and Related Calculations.

  5. Ocean thermal energy conversion (OTEC) power system development. Preliminary design report, Appendices, Part 1 (Final)

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-04

    The objective of this project is the development of a preliminary design for a full-sized, closed cycle, ammonia power system module for the 100 MWe OTEC demonstration plant. In turn, this demonstration plant is to demonstrate, by 1984, the operation and performance of an Ocean Thermal Power Plant having sufficiently advanced heat exchanger design to project economic viability for commercial utilization in the late 1980's and beyond. Included in this power system development are the preliminary designs for a proof-of-concept pilot plant and test article heat exchangers which are scaled in such a manner as to support a logically sequential, relatively low-cost development of the full-scale power system module. The conceptual designs are presented for the demonstration plant power module, the proof-of-concept pilot plant, and for a pair of test article heat exchangers. Costs associated with the design, development, fabrication, checkout, delivery, installation, and operation are included. The accompanying design and producibilty studies on the full-scale power system module project the performance/economics for the commercial plant. This section of the report contains appendices on the developed computer models, water system dynamic studies, miscellaneous performance analysis, materials and processes, detailed equipment lists, turbine design studies, tube cleaner design, ammonia leak detection, and heat exchanger design supporting data. (WHK)

  6. Molecular profiling of appendiceal epithelial tumors using massively parallel sequencing to identify somatic mutations.

    Science.gov (United States)

    Liu, Xiaoying; Mody, Kabir; de Abreu, Francine B; Pipas, J Marc; Peterson, Jason D; Gallagher, Torrey L; Suriawinata, Arief A; Ripple, Gregory H; Hourdequin, Kathryn C; Smith, Kerrington D; Barth, Richard J; Colacchio, Thomas A; Tsapakos, Michael J; Zaki, Bassem I; Gardner, Timothy B; Gordon, Stuart R; Amos, Christopher I; Wells, Wendy A; Tsongalis, Gregory J

    2014-07-01

    Some epithelial neoplasms of the appendix, including low-grade appendiceal mucinous neoplasm and adenocarcinoma, can result in pseudomyxoma peritonei (PMP). Little is known about the mutational spectra of these tumor types and whether mutations may be of clinical significance with respect to therapeutic selection. In this study, we identified somatic mutations using the Ion Torrent AmpliSeq Cancer Hotspot Panel v2. Specimens consisted of 3 nonneoplastic retention cysts/mucocele, 15 low-grade mucinous neoplasms (LAMNs), 8 low-grade/well-differentiated mucinous adenocarcinomas with pseudomyxoma peritonei, and 12 adenocarcinomas with/without goblet cell/signet ring cell features. Barcoded libraries were prepared from up to 10 ng of extracted DNA and multiplexed on single 318 chips for sequencing. Data analysis was performed using Golden Helix SVS. Variants that remained after the analysis pipeline were individually interrogated using the Integrative Genomics Viewer. A single Janus kinase 3 (JAK3) mutation was detected in the mucocele group. Eight mutations were identified in the V-Ki-ras2 Kirsten rat sarcoma viral oncogene homolog (KRAS) and GNAS complex locus (GNAS) genes among LAMN samples. Additional gene mutations were identified in the AKT1 (v-akt murine thymoma viral oncogene homolog 1), APC (adenomatous polyposis coli), JAK3, MET (met proto-oncogene), phosphatidylinositol-4,5-bisphosphate 3-kinase (PIK3CA), RB1 (retinoblastoma 1), STK11 (serine/threonine kinase 11), and tumor protein p53 (TP53) genes. Among the PMPs, 6 mutations were detected in the KRAS gene and also in the GNAS, TP53, and RB1 genes. Appendiceal cancers showed mutations in the APC, ATM (ataxia telangiectasia mutated), KRAS, IDH1 [isocitrate dehydrogenase 1 (NADP+)], NRAS [neuroblastoma RAS viral (v-ras) oncogene homolog], PIK3CA, SMAD4 (SMAD family member 4), and TP53 genes. Our results suggest molecular heterogeneity among epithelial tumors of the appendix. Next generation sequencing efforts

  7. Normal patterns of 18F-FDG appendiceal uptake in children

    Energy Technology Data Exchange (ETDEWEB)

    Reavey, Hamilton E. [Emory University, Department of Radiology and Imaging Sciences, Division of Nuclear Medicine Molecular Imaging, Atlanta, GA (United States); Alazraki, Adina L.; Simoneaux, Stephen F. [Emory University, Department of Radiology and Imaging Sciences, Division of Pediatric Imaging, Children' s Healthcare of Atlanta at Egleston, Atlanta, GA (United States)

    2014-04-15

    Prior to interpreting PET/CT, it is crucial to understand the normal biodistribution of fluorodeoxyglucose (FDG). It is also important to realize that the normal biodistribution can vary between adults and children. Although many studies have defined normal patterns of pediatric FDG uptake in structures like the thymus, brown fat and bone marrow, patterns of normal pediatric bowel activity, specifically uptake within the appendix, have not been well described. Active lymphoid tissue has increased FDG uptake when compared with inactive tissue. Since children have more active lymphoid tissue than adults, and because the appendix contains aggregated lymphoid tissue, we postulated that appendiceal uptake may be increased in pediatric patients. To define the normal level of appendiceal FDG activity in children by evaluating a series of consecutive FDG PET/CT scans performed for other indications. After obtaining IRB approval, we retrospectively reviewed 128 consecutive whole-body pediatric FDG PET/CT examinations obtained for a variety of clinical indications. CT scans on which the appendix could not be visualized were excluded from analysis. CT scans on which the appendix could be visualized were evaluated for underlying appendiceal pathology. Studies with appendiceal or periappendiceal pathology by CT criteria were excluded. A region of interest (ROI) was placed over a portion of each appendix and appendiceal maximum standardized uptake value (SUVmax) was calculated. If an adjacent loop of bowel activity interfered with accurate measurements of the appendix SUVmax, the scan was excluded from the analysis. A chart review was performed on patients with elevated appendiceal SUVmax values to ensure that the patients did not have clinical symptomatology suggestive of acute appendicitis. When the appendix or a portion of the appendix could be visualized and accurately measured, the SUVmax was determined. SUVmax of the appendix was compared to the SUVmax of normal liver and

  8. MELSAR: a mesoscale air quality model for complex terrain. Volume 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K.J.; Whiteman, C.D.

    1985-04-01

    This final report is submitted as part of the Green River Ambient Model Assessment (GRAMA) project conducted at the US Department of Energy's Pacific Northwest Laboratory for the US Environmental Protection Agency. The GRAMA Program has, as its ultimate goal, the development of validated air quality models that can be applied to the complex terrain of the Green River Formation of western Colorado, eastern Utah and southern Wyoming. The Green River Formation is a geologic formation containing large reserves of oil shale, coal, and other natural resources. Development of these resources may lead to a degradation of the air quality of the region. Air quality models are needed immediately for planning and regulatory purposes to assess the magnitude of these regional impacts. This report documents one of the models being developed for this purpose within GRAMA - specifically a model to predict short averaging time (less than or equal to 24 h) pollutant concentrations resulting from the mesoscale transport of pollutant releases from multiple sources. MELSAR has not undergone any rigorous operational testing, sensitivity analyses, or validation studies. Testing and evaluation of the model are needed to gain a measure of confidence in the model's performance. This report consists of two volumes. This volume contains the Appendices, which include listings of the FORTRAN code and Volume 1 contains the model overview, technical description, and user's guide. 13 figs., 10 tabs.

  9. Probabilistic accident consequence uncertainty analysis -- Early health effects uncertainty assessment. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Haskin, F.E. [Univ. of New Mexico, Albuquerque, NM (United States); Harper, F.T. [Sandia National Labs., Albuquerque, NM (United States); Goossens, L.H.J.; Kraan, B.C.P. [Delft Univ. of Technology (Netherlands)

    1997-12-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, was completed in 1990. These codes estimate the consequence from the accidental releases of radiological material from hypothesized accidents at nuclear installations. In 1991, the US Nuclear Regulatory Commission and the Commission of the European Communities began cosponsoring a joint uncertainty analysis of the two codes. The ultimate objective of this joint effort was to systematically develop credible and traceable uncertainty distributions for the respective code input variables. A formal expert judgment elicitation and evaluation process was identified as the best technology available for developing a library of uncertainty distributions for these consequence parameters. This report focuses on the results of the study to develop distribution for variables related to the MACCS and COSYMA early health effects models. This volume contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures, (3) the rationales and results for the panel on early health effects, (4) short biographies of the experts, and (5) the aggregated results of their responses.

  10. Probabilistic accident consequence uncertainty analysis -- Late health effects uncertain assessment. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Little, M.P.; Muirhead, C.R. [National Radiological Protection Board (United Kingdom); Goossens, L.H.J.; Kraan, B.C.P.; Cooke, R.M. [Delft Univ. of Technology (Netherlands); Harper, F.T. [Sandia National Labs., Albuquerque, NM (United States); Hora, S.C. [Univ. of Hawaii, Hilo, HI (United States)

    1997-12-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, was completed in 1990. These codes estimate the consequence from the accidental releases of radiological material from hypothesized accidents at nuclear installations. In 1991, the US Nuclear Regulatory Commission and the Commission of the European Communities began cosponsoring a joint uncertainty analysis of the two codes. The ultimate objective of this joint effort was to systematically develop credible and traceable uncertainty distributions for the respective code input variables. A formal expert judgment elicitation and evaluation process was identified as the best technology available for developing a library of uncertainty distributions for these consequence parameters. This report focuses on the results of the study to develop distribution for variables related to the MACCS and COSYMA late health effects models. This volume contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures, (3) the rationales and results for the expert panel on late health effects, (4) short biographies of the experts, and (5) the aggregated results of their responses.

  11. Probabilistic accident consequence uncertainty analysis -- Uncertainty assessment for deposited material and external doses. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Goossens, L.H.J.; Kraan, B.C.P.; Cooke, R.M. [Delft Univ. of Technology (Netherlands); Boardman, J. [AEA Technology (United Kingdom); Jones, J.A. [National Radiological Protection Board (United Kingdom); Harper, F.T.; Young, M.L. [Sandia National Labs., Albuquerque, NM (United States); Hora, S.C. [Univ. of Hawaii, Hilo, HI (United States)

    1997-12-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, was completed in 1990. These codes estimate the consequence from the accidental releases of radiological material from hypothesized accidents at nuclear installations. In 1991, the US Nuclear Regulatory Commission and the Commission of the European Communities began cosponsoring a joint uncertainty analysis of the two codes. The ultimate objective of this joint effort was to systematically develop credible and traceable uncertainty distributions for the respective code input variables. A formal expert judgment elicitation and evaluation process was identified as the best technology available for developing a library of uncertainty distributions for these consequence parameters. This report focuses on the results of the study to develop distribution for variables related to the MACCS and COSYMA deposited material and external dose models. This volume contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures, (3) the rationales and results for the panel on deposited material and external doses, (4) short biographies of the experts, and (5) the aggregated results of their responses.

  12. Probabilistic accident consequence uncertainty analysis -- Uncertainty assessment for internal dosimetry. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Goossens, L.H.J.; Kraan, B.C.P.; Cooke, R.M. [Delft Univ. of Technology (Netherlands); Harrison, J.D. [National Radiological Protection Board (United Kingdom); Harper, F.T. [Sandia National Labs., Albuquerque, NM (United States); Hora, S.C. [Univ. of Hawaii, Hilo, HI (United States)

    1998-04-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, was completed in 1990. These codes estimate the consequence from the accidental releases of radiological material from hypothesized accidents at nuclear installations. In 1991, the US Nuclear Regulatory Commission and the Commission of the European Communities began cosponsoring a joint uncertainty analysis of the two codes. The ultimate objective of this joint effort was to systematically develop credible and traceable uncertainty distributions for the respective code input variables. A formal expert judgment elicitation and evaluation process was identified as the best technology available for developing a library of uncertainty distributions for these consequence parameters. This report focuses on the results of the study to develop distribution for variables related to the MACCS and COSYMA internal dosimetry models. This volume contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures, (3) the rationales and results for the panel on internal dosimetry, (4) short biographies of the experts, and (5) the aggregated results of their responses.

  13. Report on demonstrative research on photovoltaic power generation system in Myanmar. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of installation and demonstrative operation in Myanmar of a power generation system combining a small-scale photovoltaic power generation system, a wind power generation system, and a diesel generator, research and development is being made under a six year plan starting in 1999 and ending in 2004. This paper compiles the appendices related thereto. Collected for the climatic observation are the insolation data and wind velocity data in Chaungthar, and the insolation graph in both of Chaungthar and Lethokekone. Furthermore, materials for selection and decision on the installation location, and design materials for a hybrid power generation system were collected. Collected for procurement, construction, and installation of devices and facilities include test data for the diesel generator, drawings for the power generation control panel, test operation report, bill of lading for the diesel generator, a completion certificate of the diesel generator building, photographs of the building, a certificate of completion of installation of the diesel generator, photographs taken during the installation work, a certificate of completion of power transmission cable installation, photographs of the installation works, and the operation manual for the diesel engine. (NEDO)

  14. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  15. The environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Volume 1, Appendices A-F

    International Nuclear Information System (INIS)

    1996-01-01

    This volume contains appendices to the named document. The Appendices are entitled (A) Description of Projects and Activities, (2) Federal Register Notice, (C) Relevant Regulatory Requirements, (D) Distribution Lists, (E) Impact Assessment Methods, and (F) Project-Specific Environmental Analysis

  16. N+3 Aircraft Concept Designs and Trade Studies. Volume 2; Appendices-Design Methodologies for Aerodynamics, Structures, Weight, and Thermodynamic Cycles

    Science.gov (United States)

    Greitzer, E. M.; Bonnefoy, P. A.; delaRosaBlanco, E.; Dorbian, C. S.; Drela, M.; Hall, D. K.; Hansman, R. J.; Hileman, J. I.; Liebeck, R. H.; Lovegren, J.; hide

    2010-01-01

    Appendices A to F present the theory behind the TASOPT methodology and code. Appendix A describes the bulk of the formulation, while Appendices B to F develop the major sub-models for the engine, fuselage drag, BLI accounting, etc.

  17. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  18. The safety of Ontario's nuclear power reactors. A scientific and technical review. Vol. 2: Appendices

    International Nuclear Information System (INIS)

    Hare, F.K.

    1988-01-01

    These appendices contain seven detailed elaborations of matters covered more superficially in the Technical Report. They have been written by well-known authorities, or by the professional staff of the Review. They are essential supplements to the condensed material of the Technical Report. Several of the appendices contain detailed recommendations. Some of these have been incorporated into the Review's overall conclusions and recommendations. Others stand alone, as the opinions of the appendices' authors. I am in broad agreement with most of them, but have preferred to leave them within the authors' material. I hope that they will be given detailed study by appropriate bodies, especially Ontario Hydro and the Atomic Energy Control Board

  19. A Case of Appendiceal Adenocarcinoma with Clinical Benefit from FOLFOX and Bevacizumab

    Directory of Open Access Journals (Sweden)

    Erin D. Powell

    2009-07-01

    Full Text Available A 44-year-old woman presented with lower abdominal pain and bilateral ovarian masses on ultrasound. Exploratory laparotomy revealed extensive peritoneal and intra-abdominal disease and an abnormal appendix. Bilateral salpingo-oophorectomy, infracolic omentectomy, ileocolic resection and primary anastomosis were performed. Final pathology revealed a primary appendiceal adenocarcinoma, poorly differentiated, of signet ring cell type. CT scan postoperatively revealed gross residual disease. The patient was treated with FOLFOX chemotherapy combined with bevacizumab. Repeat CT scan showed a decrease in residual disease and the patient clinically improved. After her treatment has been continued for 13 months, she remains clinically well and her CT scan shows sustained disease stability. Disseminated appendiceal carcinoma is generally considered to be refractory to 5-FU-based chemotherapy and, to our knowledge, this is the first reported case of a patient with appendiceal adenocarcinoma demonstrating clinical benefit and sustained stability of disease with combination chemotherapy plus bevacizumab.

  20. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  1. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  2. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted...

  3. 78 FR 76171 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-12-16

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and...: Geoffrey Ridder; Utopia, TX; PRT-00030B The applicant requests a permit to export the sport-hunted trophy... period. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  4. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  5. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  6. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  7. State of the Art Report on Fracture Mechanics (Fracture in the Creep Range). Volume 3: Appendices H - M

    International Nuclear Information System (INIS)

    Ellison, E.G.; Musicco, G.G.; Pineau, A.

    1988-01-01

    A CEC State of the Art Report on Fracture Mechanics for Fast Breeder Reactors (Fracture below the Creep Range) has recently been published by Bhandari and coworkers (1984). There has also been a compilation of Creep Crack Growth Data from Germany, France and the U.K. for 304 and 316 stainles steel by Lloyd et al (1984). The present Report provides considerably more data and analytical techniques taken from Worldwide sources on creep crack initiation and propagation. Since the subject is moving quickly there is an emphasis on the most recent work; indeed research studies as yet unpublished are also included. The total Report is in 3 volumes. Volume 3 contains the most important and up-to-date information in some detail in Appendices H to M; this provides a sound base for the Report and for future workers

  8. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 2, Book 2. Appendices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    The appendices include: (A) design data sheets and P and I drawing for 100-MWe commercial plant design, for all-sodium storage concept; (B) design data sheets and P and I drawing for 100-MWe commercial plant design, for air-rock bed storage concept; (C) electric power generating water-steam system P and I drawing and equipment list, 100-MWe commercial plant design; (D) design data sheets and P and I drawing for 281-MWe commercial plant design; (E) steam generator system conceptual design; (F) heat losses from solar receiver surface; (G) heat transfer and pressure drop for rock bed thermal storage; (H) a comparison of alternative ways of recovering the hydraulic head from the advanced solar receiver tower; (I) central receiver tower study; (J) a comparison of mechanical and electromagnetic sodium pumps; (K) pipe routing study of sodium downcomer; and (L) sodium-cooled advanced central receiver system simulation model. (WHK)

  9. State of the Art Report on Fracture Mechanics (Fracture in the Creep Range). Volume 2: Appendices A - G

    International Nuclear Information System (INIS)

    Ellison, E.G.; Musicco, G.G.; Pineau, A.

    1988-01-01

    A CEC State of the Art Report on Fracture Mechanics for Fast Breeder Reactors (Fracture below the Creep Range) has recently been published by Bhandari and coworkers (1984). There has also been a compilation of Creep Crack Growth Data from Germany, France and the U.K. for 304 and 316 stainles steel by Lloyd et al (1984). The present Report provides considerably more data and analytical techniques taken from Worldwide sources on creep crack initiation and propagation. Since the subject is moving quickly there is an emphasis on the most recent work; indeed research studies as yet unpublished are also included. The total Report is in 3 volumes. Volume 2 contains the most important and up-to-date information in some detail in Appendices A to G; this provides a sound base for the Report and for future workers

  10. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  11. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  12. PSD permit compliance strategies

    International Nuclear Information System (INIS)

    Cassada, J.; Astruc, S.

    1993-01-01

    Old Dominion is a not-for-profit generation and transmission cooperative owned by and serving twelve member electric distribution cooperatives in Virginia, Maryland and Delaware. These member cooperatives purchase from Old Dominion all the electric power they supply to over 345,000 member consumers. In 1988, Old Dominion evaluated its long term power needs, and the fact that 300 Megawatts (MW) of base power would have to be replaced by the end of 1994. A power supply alternative study was conducted, and concluded that the interests of the cooperative members would best be served through the construction of a conventional pulverized coal-fired generating units. After comprehensive evaluation and negotiations, Old Dominion signed a contract in April, 1989 with the Consortium of Combustion Engineering, H. B. Zachry, Black ampersand Veatch and Westinghouse for the turnkey construction of a 393 MW coal-fired facility. The contract included an option to build a second twin unit. This option was exercised in August, 1989, when Virginia Power joined Old Dominion as 50% partners in the Clover Project. The partnership agreement stipulates that Old Dominion is responsible for the licensing and construction of the plant and Virginia Power will be responsible for operations

  13. Waste Isolation Pilot Plant disposal phase final supplemental environmental impact statement. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of the Waste Isolation Pilot Plant Disposal Final Supplemental Environmental Impact Statement (SEIS-II) is to provide information on environmental impacts regarding the Department of Energy's (DOE) proposed disposal operations at WIPP. The Proposed Action describes the treatment and disposal of the Basic inventory of TRU waste over a 35-year period. The Action Alternatives proposed the treatment of the Basic Inventory and an Additional Inventory as well as the transportation of the treated waste to WIPP for disposal over a 150- to 190-year period. The three Action Alternatives include the treatment of TRU waste at consolidation sites to meet WIPP planning-basic Waste Acceptance Criteria, the thermal treatment of TRU waste to meet Land Disposal Restrictions, and the treatment of TRU waste by a shred and grout process. SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated impacts include those to the general environment and to human health. Additional issues associated with the implementation of the alternatives are discussed to provide further understanding of the decisions to be reached and to provide the opportunity for public input on improving DOE's Environmental Management Program. This volume contains the following appendices: Waste inventory; Summary of the waste management programmatic environmental impact statement and its use in determining human health impacts at treatment sites; Air quality; Life-cycle costs and economic impacts; Transportation; Human health; Facility accidents; Long-term consequence analysis for proposed action and action alternatives; Long-term consequence analysis for no action alternative 2; and Updated estimates of the DOE's transuranic waste volumes

  14. Combined cycle solar central receiver hybrid power system study. Volume III. Appendices. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-11-01

    A design study for a 100 MW gas turbine/steam turbine combined cycle solar/fossil-fuel hybrid power plant is presented. This volume contains the appendices: (a) preconceptual design data; (b) market potential analysis methodology; (c) parametric analysis methodology; (d) EPGS systems description; (e) commercial-scale solar hybrid power system assessment; and (f) conceptual design data lists. (WHK)

  15. Developing maintainability for tokamak fusion power systems. Phase I report. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Zahn, H.S.

    1977-10-01

    This volume contains the following appendices: (1) baseline large module time estimates, (2) baseline intermediate module time estimates, (3) baseline small module time estimates, (4) alternate concept estimates, (5) maintenance equipment concepts, (6) additional reactor design definition, and (7) TOCOMO supplements. (MOW)

  16. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1977-09-01

    Volume 2 is comprised of appendices: Portsmouth Gaseous Diffusion Plant Existing Facilities; Ecology; Civic Involvement; Social Analysis; Population Projections; Toxicity of Air Pollutants to Biota at Portsmouth Gaseous Diffusion Plant; and Assessment of Noise Effects of an Add-On to the Portsmouth Gaseous Diffusion Plant

  17. The environmental survey manual: Appendices E, F, G, H, I, J, and K

    International Nuclear Information System (INIS)

    1987-08-01

    Appendices E, F, G, H, I, J and K of the Environmental Survey Manual address the following topics: Field Sampling Protocols and Guidance; Guidelines for Preparation of Quality Assurance Plans; Decontamination Guidance; Data Management and Analysis; Sample and Document Management; Health and Safety Guidance for Sampling and Analysis Teams; Documents for Sampling and Analysis Program

  18. [Appendiceal abscess in the third gestational trimester of pregnancy, complications pre and postoperatively].

    Science.gov (United States)

    Cyrkowicz, A; Cibor, Z; Słowińska-Zabówka, M; Kisiel, W; Oleksy, P; Orczyk, K; Bajorek, M; Kwiek, G

    1996-01-01

    Delayed surgical intervention connected with misdiagnosis of preterm labour and urinary tract infection caused in gravida 3 in 34th gestational week appendiceal abscess, septic shock, stillbirth by cesarean section, necessity of hysterectomy, recidivism of multi peritoneal and pleural abscesses. Although the patient was rescued the retrospective pro memoria considerations of our procedure are regarded.

  19. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  20. Design tradeoff studies and sensitivity analysis. Appendices B1-B4. [HYBRID

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-25

    These four appendices to the report on the Near-Term Hybrid Vehicle (NTHV) report contain information on: HYBRID computer program documentation; material substitution study for advanced hybrid vehicles; NTHV market potential; battery compartment weight distribution; and vehicle handling dynamics. (LCL)

  1. The backfilling and sealing of radioactive waste repositories. V. 2. Figure - Tables - Appendices

    International Nuclear Information System (INIS)

    1984-01-01

    The two volumes of this report present a review study about backfilling and sealing of radioactive waste repositories in granites, argillaceous and salt formations. Volume 2 contains all the figures, table and appendices A detailed account of candidate backfill materials is given in a standardized format

  2. Developing maintainability for tokamak fusion power systems. Phase I report. Volume II. Appendices

    International Nuclear Information System (INIS)

    Zahn, H.S.

    1977-10-01

    This volume contains the following appendices: (1) baseline large module time estimates, (2) baseline intermediate module time estimates, (3) baseline small module time estimates, (4) alternate concept estimates, (5) maintenance equipment concepts, (6) additional reactor design definition, and (7) TOCOMO supplements

  3. 76 FR 64112 - Privacy Act of 1974; Privacy Act System of Records Appendices

    Science.gov (United States)

    2011-10-17

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice (11-091)] Privacy Act of 1974; Privacy Act...: Revisions of NASA Appendices to Privacy Act System of Records. SUMMARY: Notice is hereby given that NASA is... Privacy Act of 1974. This notice publishes those amendments as set forth below under the caption...

  4. Technology, safety, and costs of decommissioning a reference pressurized water reactor power station. Appendices

    International Nuclear Information System (INIS)

    Smith, R.I.; Konzek, G.J.; Kennedy, W.E. Jr.

    1978-05-01

    Detailed appendices are presented under the following headings: reference PWR facility description, reference PWR site description, estimates of residual radioactivity, alternative methods for financing decommissioning, radiation dose methodology, generic decommissioning activities, intermediate dismantlement activities, safe storage and deferred dismantlement activities, compilation of unit cost factors, and safety assessment details

  5. Draft Programmatic Environmental Impact Statement for alternative strategies for the long-term management and use of depleted uranium hexafluoride. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1997-12-01

    This PEIS assesses the potential impacts of alternative management of alternative management strategies for depleted uranium hexafluoride (UF 6 ) currently stored at three DOE sites: Paducah site near Paducah, Kentucky; Portsmouth site near Portsmouth, Ohio; and K-25 site on the Oak Ridge Reservation, Oak Ridge, Tennessee. The alternatives analyzed in the PEIS include no action, long-term storage as UF 6 , long-term storage as uranium oxide, use as uranium oxide, use as uranium metal, and disposal. The preferred alternative for the long-term management of depleted UF 6 is to use the entire inventory of material. This volume contains the appendices to volume I

  6. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  7. Extra-appendiceal findings in pediatric abdominal CT for suspected appendicitis

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, Mark; Delgado, Jorge; Mahboubi, Soroosh [The Children' s Hospital of Philadelphia, Department of Radiology, Philadelphia, PA (United States)

    2014-07-15

    Much has been written regarding the incidence, types, importance and management of abdominal CT incidental findings in adults, but there is a paucity of literature on incidental findings in children. We sought to determine the prevalence and characteristics of extra-appendiceal and incidental findings in pediatric abdominal CT performed for suspected appendicitis. A retrospective review was performed of abdominal CT for suspected appendicitis in a pediatric emergency department from July 2010 to June 2012. Extra-appendiceal findings were recorded. Any subsequent imaging was noted. Extra-appendiceal findings were divided into incidental findings of doubtful clinical significance, alternative diagnostic findings potentially providing a diagnosis other than appendicitis explaining the symptoms, and incidental findings that were abnormalities requiring clinical correlation and sometimes requiring further evaluation but not likely related to the patient symptoms. One hundred sixty-five children had abdominal CT for suspected appendicitis. Seventy-seven extra-appendiceal findings were found in 57 (34.5%) patients. Most findings (64 of 77) were discovered in children who did not have appendicitis. Forty-one of these findings (53%) could potentially help explain the patient's symptoms, while 30 of the findings (39%) were abnormalities that were unlikely to be related to the symptoms but required clinical correlation and sometimes further work-up. Six of the findings (8%) had doubtful or no clinical significance. Extra-appendiceal findings are common in children who undergo abdominal CT in the setting of suspected appendicitis. A significant percentage of these patients have findings that help explain their symptoms. Knowledge of the types and prevalence of these findings may help radiologists in the planning and interpretation of CT examinations in this patient population. (orig.)

  8. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  9. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  10. 77 FR 49453 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-16

    ... citations to, and analyses of, the applicable laws and regulations. We will not consider or include in our... period. Applicant: Alexandria Rosati, Cambridge, MA; PRT-72061A The applicant requests a permit to...

  11. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  12. 76 FR 27660 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-05-12

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... applicant requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus...

  13. 76 FR 20705 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2011-04-13

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  14. 78 FR 59052 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-09-25

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  15. 78 FR 45954 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-07-30

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  16. 76 FR 52965 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-24

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  17. 75 FR 63196 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-14

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  18. 75 FR 76022 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-07

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... public display. Multiple Applicants The following applicants each request a permit to import the sport...

  19. 76 FR 39432 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-07-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants (New Applications) The following applicants each request a permit to import the sport...

  20. 78 FR 112 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-02

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  1. 78 FR 62647 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-10-22

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  2. 77 FR 72882 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-12-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  3. 75 FR 41235 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-15

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... the species. Multiple Applicants The following applicants each request a permit to import the sport...

  4. 78 FR 21627 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-04-11

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... Tapiridae Applicant: Michael Tomb, Jackson, LA; PRT-01602B The applicant requests a permit to import a sport...

  5. 75 FR 44986 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  6. 76 FR 51051 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-17

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  7. 76 FR 32223 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-06-03

    ... studies; and (2) Those that include citations to, and analyses of, the applicable laws and regulations. We... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  8. 76 FR 80384 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-12-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  9. 76 FR 60862 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... The following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  10. 76 FR 72434 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  11. 76 FR 65207 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-10-20

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  12. 76 FR 71069 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-16

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  13. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  14. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  15. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  16. Foothills Parkway Section 8B Final Environmental Report, Volume 2, Appendices A-C

    Energy Technology Data Exchange (ETDEWEB)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NW, GSMNP, and ORNL staff interacted with Federal Highway Administration staff to develop a conceptual design plan for Section 8B with the intent of protecting critical resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this EN there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constricting Section 8B with an interchange at SR 416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER, which consists of Appendices A, B, and C, assesses the potential geologic impacts of the proposed Section 8B construction, presents the results of the Section 8B soil survey, and describes the water quality studies and analyses performed for the ER. The following summary sections provide information for geology, soils, and water quality.

  17. In situ radionuclide migration studies in a shallow sand aquifer. Part. 1. Part. 2: appendices

    International Nuclear Information System (INIS)

    Williams, G.M.; Alexander, L.S.; Hitchman, S.P.; Hooker, P.J.; Noy, D.J.; Ross, C.A.M.; Stuart, A.; West, J.M.

    1986-01-01

    As a result of a study of the geology of the British Nuclear Fuels premises at Drigg, Cumbria, the British Geological Survey identified a shallow glacial sand deposit approximately 1.5m thick, interbedded between two clay horizons. An array of boreholes has been constructed in this sand in order to study the migration of radionuclides introduced into the formation under controlled conditions of groundwater flow. Conservative tracers used in the field test include chloride (as NaCl) and iodine-131 (as NaI). Strontium-85 (as the chloride) has been used as a chemically reactive tracer in conjunction with 131 I. The principal research objectives of the programme are as follows: (1) To undertake laboratory batch sorption experiments using core material from the field site in order to choose those nuclides of radiological interest that would migrate sufficiently quickly for their behaviour to be studied in a field experiment within a reasonable time period. (2) To identify and quantify the mechanisms for nuclide/sediment interaction by determination of the geochemical distribution of 85 Sr in contaminated cores using a sequential leaching procedure. (3) To obtain appropriate data on the hydraulic characteristics of the sand formation in order to construct a mathematical model to describe groundwater flow and reactive mass transport. Part 2 of this report contains the following appendices: (1) Calculation of sorption parameters. (2) A low-cost manifold system for use with multi-level samplers. (3) Radioactivity curves for 131 I and 85 Sr. (4) Results of particle size analysis for sand aquifers

  18. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  19. Laboratory Evaluation of In Situ Chemical Oxidation for Groundwater Remediation, Test Area North, Operable Unit 1-07B, Idaho National Engineering and Environmental Laboratory, Volume Two, Appendices C, D, and E

    Energy Technology Data Exchange (ETDEWEB)

    Cline, S.R.; Denton, D.L.; Giaquinto, J.M.; McCracken, M.K.; Starr, R.C.

    1999-04-01

    These appendices support the results and discussion of the laboratory work performed to evaluate the feasibility of in situ chemical oxidation for Idaho National Environmental and Engineering Laboratory's (INEEL) Test Area North (TAN) which is contained in ORNL/TM-1371 l/Vol. This volume contains Appendices C-E. Appendix C is a compilation of all recorded data and mathematical calculations made to interpret the data. For the Task 3 and Task 4 work, the spreadsheet column definitions are included immediately before the actual spreadsheet pages and are listed as ''Sample Calculations/Column Definitions'' in the table of contents. Appendix D includes the chronological order in which the experiments were conducted and the final project costs through October 1998. Appendix E is a compilation of the monthly progress reports submitted to INEEL during the course of the project.

  20. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  1. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  2. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  3. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  4. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  5. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  6. Analysis and evaluation of GAVE chains. Part 3 of 3. Appendices; Analyse en evaluatie van GAVE-ketens. Deel 3 van 3. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bosma, W.J.P. [Arthur D. Little International, Rotterdam (Netherlands)

    1999-12-01

    The final report (part 2) contains the detailed findings of the analysis, evaluation, and integration of Novem GAVE options and aims at the reader who is interested in the detailed findings, as well as an overview of the results. For readers who are mainly interested in the high-level results, and are comfortable with Dutch, there is a short text summary of our results, entitled 'Analyse en evaluatie van GAVE-ketens, management summary' (part 1). These appendices is for readers who are interested in the underlying data and detailed assumptions. 70 refs.

  7. Assessment of LWR spent fuel disposal options. Volume 3. Study bases and system design considerations (Appendices). Technical report

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    Volume 3 (Appendices) provides a tabulation of the bases and assumptions used in the study as well as preconceptual design description and cost estimates of the facilities and transportation systems necessary to implement the various study cases.

  8. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter 7 of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi (Estonia) present technical data on production units, also with regard to new facilities. (ARW)

  9. Assessment of LWR spent fuel disposal options. Volume 3. Study bases and system design considerations (Appendices). Technical report

    International Nuclear Information System (INIS)

    1979-07-01

    Volume 3 (Appendices) provides a tabulation of the bases and assumptions used in the study as well as preconceptual design description and cost estimates of the facilities and transportation systems necessary to implement the various study cases

  10. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  11. Usefulness of measurement of the outer appendiceal diameter on abdominal computer tomography in the diagnosis of acute appendicitis

    International Nuclear Information System (INIS)

    Chisuwa, Hisanao; Tauchi, Katsunori; Mori, Shusuke; Kishimoto, Hirofumi; Koike, Hideo; Higuchi, Kayoko; Ohmori, Toshihiro; Miyazawa, Masahisa

    2008-01-01

    The purpose of this study was to evaluate the accuracy of our computer tomography (CT)-based protocol and the usefulness of measurement of the outer appendiceal diameter on CT in the diagnosis of acute appendicitis. Two-hundred thirty-nine consecutive patients with clinical diagnoses of acute appendicitis during the period from January 2002 to Jun 2004 were evaluated. The CT criterion of acute appendicitis was the outer appendiceal diameter of 6 mm or more, and/or other associated inflammatory changes. The histological criterion of acute appendicitis was the presentation of polymorphic granulocytes throughout the appendiceal wall. Of 239 patients, 235 underwent CT examination. Among 222 patients with appendectomy, 205 had histologically proven acute appendicitis. Of 200 patients who had the outer appendiceal diameter of 6 mm or more on CT, 193 had histologically proven acute appendicitis. The positive predictive value for diagnosing acute appendicitis was 92.3% in the surgery group, and 96.5% in the group that the outer appendiceal diameter was 6 mm or more on CT. The recurrence rate of acute appendicitis diagnosed by CT following conservative therapy was 35.3%, and was high (50%) in the group with the appendiceal diameter of at least 10 mm. CT is useful in the diagnosis for acute appendicitis. (author)

  12. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  13. Recommendations for a Department of Energy Nuclear Energy R and D Agenda Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The current US nuclear energy policy is primarily formulated as part of the nation`s overall energy policy. In addition, nuclear energy policy is impacted by other US policies, such as those for defense and environment, and by international obligations through their effects on nuclear weapons dismantlement and stewardship, continued reliance on space and naval nuclear power sources, defense waste cleanup, and on nuclear nonproliferation. This volume is composed of the following appendices: Appendix 1--Objectives of the Federal Government Nuclear Energy Related Policies and Research and Development Programs; Appendix 2--Nuclear Energy and Related R and D in the US; Appendix 3--Summary of Issues That Drive Nuclear Energy Research and Development; Appendix 4: Options for Policy and Research and Development; Appendix 5--Pros and Cons of Objectives and Options; and Appendices 6--Recommendations.

  14. Recommendations for a Department of Energy Nuclear Energy R and D Agenda Volume 2 Appendices

    International Nuclear Information System (INIS)

    1997-01-01

    The current US nuclear energy policy is primarily formulated as part of the nation's overall energy policy. In addition, nuclear energy policy is impacted by other US policies, such as those for defense and environment, and by international obligations through their effects on nuclear weapons dismantlement and stewardship, continued reliance on space and naval nuclear power sources, defense waste cleanup, and on nuclear nonproliferation. This volume is composed of the following appendices: Appendix 1--Objectives of the Federal Government Nuclear Energy Related Policies and Research and Development Programs; Appendix 2--Nuclear Energy and Related R and D in the US; Appendix 3--Summary of Issues That Drive Nuclear Energy Research and Development; Appendix 4: Options for Policy and Research and Development; Appendix 5--Pros and Cons of Objectives and Options; and Appendices 6--Recommendations

  15. Appendicitis complicated by appendiceal metastasis via peritoneal dissemination from lung cancer.

    Science.gov (United States)

    Shiota, Naoki; Furonaka, Makoto; Kikutani, Kazuya; Haji, Keiko; Fujisaki, Seiji; Nishida, Toshihiro

    2016-07-01

    Peritoneal disseminations from lung cancer are difficult to detect during the patient's clinical course. Therefore, complications of this condition are unclear. We report a case in which peritoneal dissemination from lung cancer complicated appendicitis. A 74-year-old man with lung cancer who was receiving maintenance therapy presented at our hospital because of abdominal pain. It was the seventh day after the 14th cycle of maintenance therapy with bevacizumab. He was diagnosed with acute appendicitis. The resected appendix showed acute appendicitis complicated by appendiceal metastasis from lung cancer. Adenocarcinoma was observed predominantly in the serous membrane from the neck to the tail of the appendix. The distribution of the adenocarcinoma was diffuse. Peritoneal dissemination was considered the route of metastasis. He was admitted to the palliative care unit 10 months after appendectomy. Appendiceal metastasis via peritoneal dissemination from lung cancer complicated appendicitis in our patient who had been receiving bevacizumab.

  16. Advisory Committee on human radiation experiments. Supplemental Volume 2a, Sources and documentation appendices. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    This large document provides a catalog of the location of large numbers of reports pertaining to the charge of the Presidential Advisory Committee on Human Radiation Research and is arranged as a series of appendices. Titles of the appendices are Appendix A- Records at the Washington National Records Center Reviewed in Whole or Part by DoD Personnel or Advisory Committee Staff; Appendix B- Brief Descriptions of Records Accessions in the Advisory Committee on Human Radiation Experiments (ACHRE) Research Document Collection; Appendix C- Bibliography of Secondary Sources Used by ACHRE; Appendix D- Brief Descriptions of Human Radiation Experiments Identified by ACHRE, and Indexes; Appendix E- Documents Cited in the ACHRE Final Report and other Separately Described Materials from the ACHRE Document Collection; Appendix F- Schedule of Advisory Committee Meetings and Meeting Documentation; and Appendix G- Technology Note

  17. Advisory Committee on human radiation experiments. Supplemental Volume 2a, Sources and documentation appendices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    This large document provides a catalog of the location of large numbers of reports pertaining to the charge of the Presidential Advisory Committee on Human Radiation Research and is arranged as a series of appendices. Titles of the appendices are Appendix A- Records at the Washington National Records Center Reviewed in Whole or Part by DoD Personnel or Advisory Committee Staff; Appendix B- Brief Descriptions of Records Accessions in the Advisory Committee on Human Radiation Experiments (ACHRE) Research Document Collection; Appendix C- Bibliography of Secondary Sources Used by ACHRE; Appendix D- Brief Descriptions of Human Radiation Experiments Identified by ACHRE, and Indexes; Appendix E- Documents Cited in the ACHRE Final Report and other Separately Described Materials from the ACHRE Document Collection; Appendix F- Schedule of Advisory Committee Meetings and Meeting Documentation; and Appendix G- Technology Note.

  18. PSD Permit for the Marblehead Lime Company

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. Honda Permits to Install 1 Year Aggregation

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. Radiological performance assessment for the E-Area Vaults Disposal Facility. Appendices A through M

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.

    1994-04-15

    These document contains appendices A-M for the performance assessment. They are A: details of models and assumptions, B: computer codes, C: data tabulation, D: geochemical interactions, E: hydrogeology of the Savannah River Site, F: software QA plans, G: completeness review guide, H: performance assessment peer review panel recommendations, I: suspect soil performance analysis, J: sensitivity/uncertainty analysis, K: vault degradation study, L: description of naval reactor waste disposal, M: porflow input file. (GHH)

  1. Technology, safety and costs of decommissioning a reference boiling water reactor power station. Appendices. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Oak, H.D.; Holter, G.M.; Kennedy, W.E. Jr.; Konzek, G.J.

    1980-06-01

    Appendices are presented concerning the evaluations of decommissioning financing alternatives; reference site description; reference BWR facility description; radiation dose rate and concrete surface contamination data; radionuclide inventories; public radiation dose models and calculated maximum annual doses; decommissioning methods; generic decommissioning information; immediate dismantlement details; passive safe storage, continuing care, and deferred dismantlement details; entombment details; demolition and site restoration details; cost estimating bases; public radiological safety assessment details; and details of alternate study bases.

  2. Review of technology for Arctic offshore oil and gas recovery. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Sackinger, W. M.

    1980-06-06

    This volume contains appendices of the following: US Geological Survey Arctic operating orders, 1979; Det Noske Vertas', rules for the design, construction and inspection of offshore technology, 1977; Alaska Oil and Gas Association, industry research projects, March 1980; Arctic Petroleum Operator's Association, industry research projects, January 1980; selected additional Arctic offshore bibliography on sea ice, icebreakers, Arctic seafloor conditions, ice-structures, frost heave and structure icing.

  3. Technology, safety, and costs of decommissioning reference light-water reactors following postulated accidents. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, E S; Holter, G M

    1982-11-01

    Appendices contain information concerning the reference site description; reference PWR facility description; details of reference accident scenarios and resultant contamination levels; generic cleanup and decommissioning information; details of activities and manpower requirements for accident cleanup at a reference PWR; activities and manpower requirements for decommissioning at a reference PWR; costs of decommissioning at a reference PWR; cost estimating bases; safety assessment details; and details of post-accident cleanup and decommissioning at a reference BWR.

  4. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 2. Appendices

    International Nuclear Information System (INIS)

    1998-07-01

    The appendices contains additional relevant information on: Environment Australia EIS Guidelines, composition of the Study Team, Consultation Activities and Resuits, Relevant Legislation and Regulatory Requirements, Exampies of Multi-Purpose Research Reactors, Impacts of Radioactive Emissions and Wastes Generated at Lucas Heights Science and Technology Centre, Technical Analysis of the Reference Accident, Flora and Fauna Species Lists, Summary of Environmental Commitments and an Outline of the Construction Environmental Management Plan Construction Environmental Management Plan

  5. Biomass, the green motor in transition. State-of-the-art after the second phase. Appendices

    International Nuclear Information System (INIS)

    Gigler, J.

    2004-01-01

    The project Transition Biomass is part of the transition towards a sustainable energy economy in the Netherlands, initiated by the Ministry of Economic Affairs. The aim of the project is to start a societal process of changes to realize a large-scale and sustainable use of biomass for the production of energy, transportation fuels and products. In the main report an overview is given of the results in 2003. This report comprises the appendices [nl

  6. Membranous appendices of spherosomes (oleosomes) : Possible role in fat utilization in germinating oil seeds.

    Science.gov (United States)

    Wanner, G; Theimer, R R

    1978-01-01

    Spherosomes (oleosomes) of cotyledons of rape (Brassica napus L.), sunflower (Helianthus annuus L.), and watermelon (Citrullus vulgaris, Schrad.) seedlings are delimited by a "half unit membrane" that appears to be continuous with each of the osmiophilic layers of a tripartite unit membrane forming a handlelike appendix of the spherosomes. Prior to any noticeable utilization of the spherosomal storage fat, ribosomes were found to be attached to these "handles". At later stages appendices of the spherosomes are smooth, showing a diameter of about 22 nm that greatly exceeds the thickness of any other unit membrane profiles identical in structure and diameter osomes appears to be continuous with the thick lipid layer of the handles. In intermediate stages of fat depletion the spherosomal bodies become invaginated with cytoplasmic material. Finally vesicles with cytoplasmic contents surrounded by a membrane with a typically thick lipid layer are left in the cells. Membrane profiles indentical in structure and diameter to the spherosomal appendices were also present in electron micrographs of the lipolytic membrane fraction recovered from sucrose density gradients after centrifugation of a microsomal cell fraction. The ultrastructural observations are taken for evidence that the spherosomal appendices represent the lipase-carrying membranes isolated previously (Theimer and Rosnitschek, 1978). A novel hypothesis for development and utilization of fat-storing spherosomes is also proposed.

  7. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report (Vol. 6) for the WIPP facility contains appendices on the following information: Site characterization; general geology; ecological monitoring; and chemical compatibility of waste forms and container materials

  8. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  9. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  10. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  11. Foothills Parkway Section 8B Final Environmental Report, Volume 4, Appendices E-I

    Energy Technology Data Exchange (ETDEWEB)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NPS, GSMNP, and ORNL staff interacted with Federal Highway Administration staff to develop a conceptual design plan for Section 8B with the intent of protecting critical, resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this ER, there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constructing Section 8B with an interchange at SR 416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER consists of Appendices E through I (all ecological survey reports), which are summarized individually in the sections that follow. The following conclusions result from the completion of these surveys and the ER impact analysis: (1) Forest clearing should be limited as much as possible; (2) Disturbed areas should be replanted with native trees; (3) Drainages should be bridged rather than leveled with cut and fill; (4) For areas of steep slopes and potential erosion

  12. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  13. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  14. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  15. Intra-appendiceal air at CT: Is it a seful or a onfusing sign for the diagnosis of acute appendicitis?

    International Nuclear Information System (INIS)

    Hong, Hye Suk; Cho, Hyun Suk; Woo, Ji Young; Lee, Yul; Yang, Ik; Hwang, Ji Young; Kim, Han Myun; Kim, Jeong Won

    2016-01-01

    To investigate the significance of intra-appendiceal air at CT for the evaluation of appendicitis. We retrospectively analyzed 458 patients (216 men, 242 women; age range, 18-91 years) who underwent CT for suspected appendicitis. Two independent readers reviewed the CT. Prevalence, amount, and appearance of intra-appendiceal air were assessed and compared between the patients with and without appendicitis. Performance of CT diagnosis was evaluated in two reading strategies: once ignoring appendiceal air (strategy 1), and the other time considering presence of appendiceal air as indicative of no appendicitis in otherwise indeterminate cases (strategy 2), using receiver operating characteristic (ROC) analysis. Of the 458 patients, 102 had confirmed appendicitis. The prevalence of intra-appendiceal air was significantly different between patients with (13.2%) and without (79.8%) appendicitis (p < 0.001). The amount of appendiceal air was significantly lesser in patients having appendicitis as compared with the normal group, for both reader 1 (p = 0.011) and reader 2 (p = 0.002). Stool-like appearance and air-fluid levels were more common in the appendicitis group than in the normal appendix for both readers (p < 0.05). Areas under the ROC curves were not significantly different between strategies 1 and 2 in reader 1 (0.971 vs. 0.985, respectively; p = 0.056), but showed a small difference in reader 2 (0.969 vs. 0.986, respectively; p = 0.042). Although significant differences were seen in the prevalence, amount, and appearance of intra-appendiceal air between patients with and without appendicitis, it has a limited incremental value for the diagnosis of acute appendicitis

  16. Intra-appendiceal air at CT: Is it a seful or a onfusing sign for the diagnosis of acute appendicitis?

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Hye Suk; Cho, Hyun Suk; Woo, Ji Young; Lee, Yul; Yang, Ik; Hwang, Ji Young; Kim, Han Myun; Kim, Jeong Won [Kangnam Sacred Heart Hospital, Hallym University College of Medicine, Seoul (Korea, Republic of)

    2016-02-15

    To investigate the significance of intra-appendiceal air at CT for the evaluation of appendicitis. We retrospectively analyzed 458 patients (216 men, 242 women; age range, 18-91 years) who underwent CT for suspected appendicitis. Two independent readers reviewed the CT. Prevalence, amount, and appearance of intra-appendiceal air were assessed and compared between the patients with and without appendicitis. Performance of CT diagnosis was evaluated in two reading strategies: once ignoring appendiceal air (strategy 1), and the other time considering presence of appendiceal air as indicative of no appendicitis in otherwise indeterminate cases (strategy 2), using receiver operating characteristic (ROC) analysis. Of the 458 patients, 102 had confirmed appendicitis. The prevalence of intra-appendiceal air was significantly different between patients with (13.2%) and without (79.8%) appendicitis (p < 0.001). The amount of appendiceal air was significantly lesser in patients having appendicitis as compared with the normal group, for both reader 1 (p = 0.011) and reader 2 (p = 0.002). Stool-like appearance and air-fluid levels were more common in the appendicitis group than in the normal appendix for both readers (p < 0.05). Areas under the ROC curves were not significantly different between strategies 1 and 2 in reader 1 (0.971 vs. 0.985, respectively; p = 0.056), but showed a small difference in reader 2 (0.969 vs. 0.986, respectively; p = 0.042). Although significant differences were seen in the prevalence, amount, and appearance of intra-appendiceal air between patients with and without appendicitis, it has a limited incremental value for the diagnosis of acute appendicitis.

  17. Photovoltaic venture analysis. Final report. Volume III. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Posner, D.; Schiffel, D.; Doane, J.; Bishop, C.

    1978-07-01

    This appendix contains a brief summary of a detailed description of alternative future energy scenarios which provide an overall backdrop for the photovoltaic venture analysis. Also included is a summary of a photovoltaic market/demand workshop, a summary of a photovoltaic supply workshop which used cross-impact analysis, and a report on photovoltaic array and system prices in 1982 and 1986. The results of a sectorial demand analysis for photovoltaic power systems used in the residential sector (single family homes), the service, commercial, and institutional sector (schools), and in the central power sector are presented. An analysis of photovoltaics in the electric utility market is given, and a report on the industrialization of photovoltaic systems is included. A DOE information memorandum regarding ''A Strategy for a Multi-Year Procurement Initiative on Photovoltaics (ACTS No. ET-002)'' is also included. (WHK)

  18. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  19. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  20. 45 CFR 671.6 - Applications for permits.

    Science.gov (United States)

    2010-10-01

    ... such releases; arrangements for waste management, including, without limitation, plans for waste...) The desired effective date and duration of the permit; and (5) The following certification: “I certify... (including duration). The notice shall invite the submission by interested parties, the Environmental...

  1. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  2. Intra-Appendiceal Air at CT: Is It a Useful or a Confusing Sign for the Diagnosis of Acute Appendicitis?

    Science.gov (United States)

    Cho, Hyun Suk; Woo, Ji Young; Lee, Yul; Yang, Ik; Hwang, Ji-Young; Kim, Han Myun; Kim, Jeong Won

    2016-01-01

    Objective To investigate the significance of intra-appendiceal air at CT for the evaluation of appendicitis. Materials and Methods We retrospectively analyzed 458 patients (216 men, 242 women; age range, 18-91 years) who underwent CT for suspected appendicitis. Two independent readers reviewed the CT. Prevalence, amount, and appearance of intra-appendiceal air were assessed and compared between the patients with and without appendicitis. Performance of CT diagnosis was evaluated in two reading strategies: once ignoring appendiceal air (strategy 1), and the other time considering presence of appendiceal air as indicative of no appendicitis in otherwise indeterminate cases (strategy 2), using receiver operating characteristic (ROC) analysis. Results Of the 458 patients, 102 had confirmed appendicitis. The prevalence of intra-appendiceal air was significantly different between patients with (13.2%) and without (79.8%) appendicitis (p appendicitis as compared with the normal group, for both reader 1 (p = 0.011) and reader 2 (p = 0.002). Stool-like appearance and air-fluid levels were more common in the appendicitis group than in the normal appendix for both readers (p appendicitis, it has a limited incremental value for the diagnosis of acute appendicitis. PMID:26798214

  3. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  4. Treatment of appendiceal mass– a qualitative systematic review

    DEFF Research Database (Denmark)

    Olsen, Jesper Arnold; Skovdal, Jan; Qvist, Niels

    2014-01-01

    -abdominal abscesses and abscesses of any cause other than appendicitis were excluded as were also studies only describing recurrent appendicitis and/or interval appendectomy. Sub-analyses were performed in children, adults, and in mixed populations. RESULTS: A total of 48 studies were found eligible; they included...

  5. The METAL System. Volume I and Volume II. Appendices.

    Science.gov (United States)

    1981-01-01

    Chapter VI, can be performed by a monolingual person with very little training. In addition, the use of one of the more sophisticated text editing...paradigmatic or stylistic manipu- lation. Usually the form most likely to be included in a dictionary is selected, such as nominative singular for nouns...34, "low", "better", "most") OTR = other ("left") Participial adjectives which occur in the reference dictionary will be coded on the assumption that they

  6. Barnwell Nuclear Fuels Plant applicability study. Volume III. Appendices

    International Nuclear Information System (INIS)

    1978-03-01

    Volume III suppliees supporting information to assist Congress in making a decision on the optimum utilization of the Barnwell Nuclear Fuels Plant. Included are applicable fuel cycle policies; properties of reference fuels; description and evaluation of alternative operational (flue cycle) modes; description and evaluation of safeguards systems and techniques; description and evaluation of spiking technology; waste and waste solidification evaluation; and Department of Energy programs relating to nonproliferation

  7. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  8. Fort Drum Preliminary Fiscal Impact Analysis: Technical Appendices,

    Science.gov (United States)

    1986-01-01

    the Capital Expenditure table are those normally included in "equipment and capital outlay" by the New York State Department of Audit and Control...19 . - - C a a * -~- -- - - e a aa - - -- - C a c z - =----- -- a X- - - - Z.-.- -- -- - - a - - - I . Ch ... .aCa aC... - "-a C " fl C ana~ acca ...a - I m a - * Sa a - - S a -* ma m aaamn n * a -- a a a * a a C~0aaa~ aCCa -----------,a a 0~ an a a - - - - ma a a . - a * - aa a a a S a - a

  9. HIBAL Program. Preliminary Warhead-Design. Volume II. Appendices.

    Science.gov (United States)

    1980-09-15

    Mild Steel (iAi i018). ............. 11-2 B. SAE 4130 .. .. .. .... ...... ....... 11-3 C. SAE 4140 ......... .... .... ......... 11-3 D, SAE 4340...11-7 - Test Data for SAE 4140 Steel Frag- ments ...... ................ 11-14 Figure II-7A - 4142 ... .............. 11-15 Figure 11-8 - Test Data...included the following types of steel: SAE 1018, 4130, 4140 and 4340; 5-317 and 5-876 Carpenter tool steel; Anico HY-80 and SSS-100 steel; AISI-S7

  10. Speech Signal Processing Research. Appendices 1 thru 9

    Science.gov (United States)

    1975-12-01

    has been included in the block diagram to show the primary source of control and to emphasize the fact that the internal structure of the MP-32A is...displays the message: PASSWORD? The user must then respond with the correct password and a carriage return. Before performing cue actual deletion...MD DP’/DPR.ACL+l/ ACR 0,(MDw.) used In function defined. MA This option is used to retrive mem- ory data for which a read memory cycle was

  11. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The appendices contains additional relevant information on: Environment Australia EIS Guidelines, composition of the Study Team, Consultation Activities and Resuits, Relevant Legislation and Regulatory Requirements, Exampies of Multi-Purpose Research Reactors, Impacts of Radioactive Emissions and Wastes Generated at Lucas Heights Science and Technology Centre, Technical Analysis of the Reference Accident, Flora and Fauna Species Lists, Summary of Environmental Commitments and an Outline of the Construction Environmental Management Plan Construction Environmental Management Plan figs., ills., refs. Prepared for Australian Nuclear Science and Technology Organisation (ANSTO)

  12. Technology, Safety and Costs of Decommissioning a Reference Low-Level Waste Burial Ground. Appendices

    International Nuclear Information System (INIS)

    None

    1980-01-01

    Safety and cost information are developed for the conceptual decommissioning of commercial low-level waste (LLW) burial grounds. Two generic burial grounds, one located on an arid western site and the other located on a humid eastern site, are used as reference facilities for the study. The two burial grounds are assumed to have the same site capacity for waste, the same radioactive waste inventory, and similar trench characteristics and operating procedures. The climate, geology. and hydrology of the two sites are chosen to be typical of real western and eastern sites. Volume 2 (Appendices) contains the detailed analyses and data needed to support the results given in Volume 1.

  13. Methodologies for Verification and Validation of Space Launch System (SLS) Structural Dynamic Models: Appendices

    Science.gov (United States)

    Coppolino, Robert N.

    2018-01-01

    Verification and validation (V&V) is a highly challenging undertaking for SLS structural dynamics models due to the magnitude and complexity of SLS subassemblies and subassemblies. Responses to challenges associated with V&V of Space Launch System (SLS) structural dynamics models are presented in Volume I of this paper. Four methodologies addressing specific requirements for V&V are discussed. (1) Residual Mode Augmentation (RMA). (2) Modified Guyan Reduction (MGR) and Harmonic Reduction (HR, introduced in 1976). (3) Mode Consolidation (MC). Finally, (4) Experimental Mode Verification (EMV). This document contains the appendices to Volume I.

  14. The safety culture of the nuclear plants of Sydkraft. Appendices 5-7

    International Nuclear Information System (INIS)

    Edmondson, B.; Firing, J.A.; Nordland, O.S.; Ottne, E.

    1994-01-01

    This separate volume of appendices contains three contributions: ''Safety in Nuclear Electric'' by Bryan Edmondson, which reviews the legislation for nuclear safety in Britain, reproduces the Health and Policy Statement by Nuclear Electric, and describes the management of health and safety in the company. ''Safety in Norwegian off-shore industry'' by Joergen A. Firing, describing the safety practices of the Statoil Group and reproducing the relevant Norwegian law. ''The safety management in SAS Airline. The safety and quality in airline industries'' by O.S. Nordland and E. Ottne describing safety organization, internal control systems, and education and training in SAS

  15. Technical area status report for chemical/physical treatment. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Brown, C.H. Jr. [Oak Ridge National Lab., TN (United States); Schwinkendorf, W.E. [BDM Federal, Inc., Arlington, VA (United States)

    1993-08-01

    These Appendices describe various technologies that may be applicable to the Mixed Waste Treatment Plant (MWTP) Chemical/Physical Treatment System (CPTS). These technologies were identified by the CPTS Technical Support Group (TSG) as potentially applicable to a variety of separation, volume reduction, and decontamination requirements. The purpose was to identify all available and developing technologies, and their characteristics, for subsequent evaluation for specific requirements identified for the CPTS. However, the technologies described herein are not necessarily all inclusive, nor are they necessarily all applicable.

  16. Evaluation of Agency Non-Code Layered Pressure Vessels (LPVs) . Volume 2; Appendices

    Science.gov (United States)

    Prosser, William H.

    2014-01-01

    In coordination with the Office of Safety and Mission Assurance and the respective Center Pressure System Managers (PSMs), the NASA Engineering and Safety Center (NESC) was requested to formulate a consensus draft proposal for the development of additional testing and analysis methods to establish the technical validity, and any limitation thereof, for the continued safe operation of facility non-code layered pressure vessels. The PSMs from each NASA Center were asked to participate as part of the assessment team by providing, collecting, and reviewing data regarding current operations of these vessels. This document contains the appendices to the main report.

  17. Report to Congress on Server and Data Center Energy Efficiency: Public Law 109-431: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Alliance to Save Energy; ICF Incorporated; ERG Incorporated; U.S. Environmental Protection Agency; Brown, Richard E; Brown, Richard; Masanet, Eric; Nordman, Bruce; Tschudi, Bill; Shehabi, Arman; Stanley, John; Koomey, Jonathan; Sartor, Dale; Chan, Peter; Loper, Joe; Capana, Steve; Hedman, Bruce; Duff, Rebecca; Haines, Evan; Sass, Danielle; Fanara, Andrew

    2007-08-02

    This report is the appendices to a companion report, prepared in response to the request from Congress stated in Public Law 109-431 (H.R. 5646),"An Act to Study and Promote the Use of Energy Efficient Computer Servers in the United States." This report assesses current trends in energy use and energy costs of data centers and servers in the U.S. (especially Federal government facilities) and outlines existing and emerging opportunities for improved energy efficiency. It also makes recommendations for pursuing these energy-efficiency opportunities broadly across the country through the use of information and incentive-based programs.

  18. Local Agenda 21 in Apeldoorn, Netherlands. Appendices; Lokale Agenda 21 in Apeldoorn. Bijlagenrapport

    Energy Technology Data Exchange (ETDEWEB)

    Dullens, M.; Schouw, J.C.; Straatman, T.G.

    1999-08-01

    The (im)possibilities of concrete projects to start Local Agenda 21 activities in Apeldoorn, Netherlands, are discussed. Attention is paid to options with respect to transportation, energy conservation, water use, soil pollution, waste management, and nature. Local Agenda 21 is a program by means of which local governments can contribute to sustainable targets as formulated during the 1992 conference Agenda 21 of the United Nations (UN). The appendices contain background information (reports of meetings, elaboration of ecological subjects in relation with socio-economic subjects, and a table with all the recommendations) and are published in this report. The main report is a separate publication.

  19. [Expression of receptors of estrogens and androgens in the testicular appendices].

    Science.gov (United States)

    Paredes Esteban, R M; Luque Barona, R J; Velasco Sánchez, B; Rodríguez Vargas, J; Lorite, A; García Ruiz, M

    2008-07-01

    The appendices or hidátides of the testicle are structures that are considered an embryonic rest. In testicular hidátide estrogen receivers have been demonstrated but in the epididimys the results vary. Has been theorized that the elevation of the estrogen levels in the puberty can produce an inflammation and torsion of hidátide, nevertheless, in the epididimys in which the estrogen expression is not clear (and also they are twisted) the theory is put in doubt. This controversy takes us to the accomplishment of this work. A prospective study is made in 20 testicular appendices, of which 7 from the epididimys are extirpated of patients to whom an escrotal exploration is made in the development of surgery of processes of the inguino-escrotal channel (hidroceles, hernias). Optical microscopy and inmunohistoquímical study are analyzed by means of using prediluted monoclonales antibodies, for receivers of estrogens, androgens and proliferative index. The results were proceed and analyzed by means of SPSS statistical program. All hidátides, testicular and from the epididimarys expressed receivers for estrogens without significant difference among them, not existing differences as far as the location of receiving sayings within the three compartments of hidátide. The number of estrogen receivers was in relation to the age of the patient. Only hidátides from the epididimys fundamentally expressed receivers of located androgens and at level of ductus. We have not found significant relation between the proliferative index and the expression of estrogen receivers. The proliferative index was more elevated at level of ductus. 1) As much the testicular appendices as those from the epididimays expressed receivers of estrogens at level of the three compartments. It makes think about a same embryonic origin, although only the epididimal ones expressed androgen receivers. 2) the observation of estrogen receivers in both types of hidátides, as well as the relation of the

  20. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  1. Report on corrections and future considerations for Appendices II–VIII of the International Code of Nomenclature for Algae, Fungi, and Plants

    Science.gov (United States)

    For the first time, the main text and Appendices II–VIII of the International Code of Nomenclature were separately published following decisions of the Melbourne Nomenclature Section, which contributed to subsequent development of an online resource capable of producing the Appendices in real time. ...

  2. Multiple caeco-appendiceal fistulas and diverticulosis: a newly defined congenital anomaly of the appendix-report of the first case.

    Science.gov (United States)

    Yucel, Ahmet Fikret; Pergel, Ahmet; Kocakusak, Ahmet; Aydin, Ibrahim; Bagci, Pelin; Sahin, Dursun Ali

    2011-11-01

    Congenital anomalies of the appendix are extremely rare. They are usually found incidentally during operations other than appendectomies. Congenital appendix diverticula are even less frequent. Congenital caeco-appendiceal fistulae have not been reported until today. Herein, we present real diverticula of the appendix with multiple caeco-appendiceal fistulae which, to our knowledge, is the first in the literature.

  3. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  4. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  5. Verification and validation guidelines for high integrity systems: Appendices A--D, Volume 2

    International Nuclear Information System (INIS)

    Hecht, H.; Hecht, M.; Dinsmore, G.; Hecht, S.; Tang, D.

    1995-03-01

    The following material is furnished as an experimental guide for the use of risk based classification for nuclear plant protection systems. As shown in Sections 2 and 3 of this report, safety classifications for the nuclear field are application based (using the function served as the primary criterion), whereas those in use by the process industry and the military are risk based. There are obvious obstacles to the use of risk based classifications (and the associated integrity levels) for nuclear power plants, yet there are also many potential benefits, including: it considers all capabilities provided for dealing with a specific hazard, thus assigning a lower risk where multiple protection is provided (either at the same or at lower layers); this permits the plant management to perform trade-offs between systems that meet the highest qualification levels or multiple diverse systems at lower qualification levels; it motivates the use (and therefore also the development) of protection systems with demonstrated low failure probability; and it may permit lower cost process industry equipment of an established integrity level to be used in nuclear applications (subject to verification of the integrity level and regulatory approval). The totality of these benefits may reduce the cost of digital protection systems significantly an motivate utilities to much more rapid upgrading of the capabilities than is currently the case. Therefore the outline of a risk based classification is presented here, to serve as a starting point for further investigation and possible trial application

  6. Appendiceal Mucocele Detected under Treatment of Ulcerative Colitis

    Directory of Open Access Journals (Sweden)

    Rohta Noaki

    2009-11-01

    Full Text Available A 33-year-old female patient with ulcerative colitis was referred to our outpatient clinic in January 2008 with right lower abdominal pain without bloody diarrhea. Colonoscopy found mild proctosigmoiditis and a submucoal tumor with a maximal diameter of 5 cm in the cecum. Computed tomography revealed a large, hypodense, cystic cylindrical structure extending to the pelvic space. For severe pain, she underwent partial resection of the cecum including the tumor in March 2008. Intraoperatively, the vermiform appendix was swollen like a sausage and compressing the cecum, which accounted for what appeared to be a submucosal tumor like a volcano by endoscopy. Lymphadenectomy was not performed because malignancy was not suspected. In the surgical specimen, the vermiform appendix was spindle-shaped and contained a large quantity of viscous liquid. Postoperative pathological diagnosis was mucinous cystadenoma, and no cancer cells were present in the viscous liquid within the vermiform appendix. The patient left the hospital 7 days postoperatively, and her colitis remains in remission without any complications.

  7. Development of a dynamic model to evaluate economic recovery following a nuclear attack. Volume 2. Model equations (appendices C and D). Final report

    International Nuclear Information System (INIS)

    Peterson, D.W.; Silverman, W.S.; Weil, H.B.; Willard, S.

    1980-11-01

    A highly-robust, dynamic simulation model of the US economy has been constructed to evaluate the likely economic response after various nuclear attacks or other severe disruptions, under various policies and assumptions. The model consists of a large system of nonlinear, recursive, time-difference equations. The solution-interval of the model is adjustable, with a maximum value of three weeks. The model represents the economy in thirteen sectors. Each sector contains a detailed representation of production, distribution, supply constraints, finance, employment, pricing, and wages. Also included are a full input-output representation of the interconnections among the sectors, and the psychological responses of corporate planners, consumers, and the labor force. The model's equations are formulated to remain consistent and realistic for all values of the variables, including the most extreme conditions. Therefore, the model can realistically simulate any degree or time sequence of nuclear attacks, pre-attack surges, mobilization, or policy shifts. Simulation experiments with the model suggest that the economy is highly vulnerable to nuclear attack, and that recovery requires extensive preparation, including psychological readiness, technology maintenance, special financial policies, and (if possible) maintenance of foreign trade. Civil defense policies must be adaptive (contingent on the nature of the damage) and must strive for balance among sectors, rather than maximum survival. The simulation model itself consists of an interrelated set of mathematical equations, written in the computer language DYNAMO. Two appendices to the report are presented in this volume. Appendix C gives a brief introduction to the conventions and notations of the DYNAMO language. The equations, definitions, and variables of the model are listed in Appendix D. For the convenience of the reader, these two appendices are bound separately

  8. Primary appendiceal lymphoma presenting as suspected perforated acute appendicitis: clinical, sonography and CT findings with pathologic correlation.

    Science.gov (United States)

    Guo, Jingjing; Wu, Gang; Chen, Xiaojun; Li, Xiaodong

    2014-01-01

    The gastrointestinal tract is the most common site for extranodal involvement by non-Hodgkin's lymphoma. However, primary appendiceal lymphomas presenting as perforated acute appendicitis are very rare: they occur in only 0.015% of all gastrointestinal lymphoma cases. The management of this condition is still controversial, and a multimodality approach (e.g., surgery, radiation therapy, and chemotherapy) is the optimal treatment. In these cases, appendiceal non-Hodgkin's lymphomas typically manifest with acute symptoms in patients with no prior lymphoma history. Additionally, we treated our patient with a right hemicolectomy and postoperative multiagent chemotherapy.

  9. Joint Peru/United States report on Peru/United States cooperative energy assessment. Volume 1. Executive summary, main report and appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-01

    In 1978, the US and Peru conducted a comprehensive assessment of Peru's energy resources, needs, and uses and developed several alternative energy strategies that utilize the available resources to meet their energy requirements. This Volume I reports the findings of the assessment and contains the executive summary, the main report, and five appendices of information that support the integrated energy supply and demand analysis. The following chapters are included: The Energy Situation in Peru (economic context and background, energy resources and production, energy consumption patterns); Reference Supply and Demand Projection (approach, procedures, and assumptions; economic projections; energy demand and supply projections; supply/demand integration; uncertainties); and The Development of Strategies and Options (the analysis of options; strategies; increased use of renewables, hydropower, coal; increased energy efficiency; and financial analysis of strategies).

  10. Final programmatic environmental impact statement for alternative strategies for the long-term management and use of depleted uranium hexafluoride. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1999-04-01

    This PEIS assesses the potential impacts of alternative management strategies for depleted uranium hexafluoride (UF 6 ) currently stored at three DOE sites: Paducah site near Paducah, Kentucky, Portsmouth site near Portsmouth, Ohio; and K-25 site on the Oak Ridge Reservation, Oak Ridge, Tennessee. The alternatives analyzed in the PEIS include no action, long-term storage as UF 6 , long-term storage as uranium oxide, use as uranium oxide, use as uranium metal, and disposal. DOE's preferred alternative is to begin conversion of the depleted UF 6 inventory as soon as possible, either to uranium oxide, uranium metal, or a combination of both, while allowing for use of as much of this inventory as possible. This volume contains Appendices A--O

  11. Crew Exploration Vehicle (CEV) (Orion) Occupant Protection. [Appendices Part 2

    Science.gov (United States)

    Currie-Gregg, Nancy J.; Gernhardt, Michael L.; Lawrence, Charles; Somers, Jeffrey T.

    2016-01-01

    The purpose of this study was to determine the similarity between the response of the THUMS model and the Hybrid III Anthropometric Test Device (ATD) given existing Wright-Patterson (WP) sled tests. There were four tests selected for this comparison with frontal, spinal, rear, and lateral loading. The THUMS was placed in a sled configuration that replicated the WP configuration and the recorded seat acceleration for each test was applied to model seat. Once the modeling simulations were complete, they were compared to the WP results using two methods. The first was a visual inspection of the sled test videos compared to the THUMS d3plot files. This comparison resulted in an assessment of the overall kinematics of the two results. The other comparison was a comparison of the plotted data recorded for both tests. The metrics selected for comparison were seat acceleration, belt forces, head acceleration and chest acceleration. These metrics were recorded in all WP tests and were outputs of the THUMS model. Once the comparison of the THUMS to the WP tests was complete, the THUMS model output was also examined for possible injuries in these scenarios. These outputs included metrics for injury risk to the head, neck, thorax, lumbar spine and lower extremities. The metrics to evaluate head response were peak head acceleration, HIC15, and HIC36. For the neck, N (sub ij) was calculated. The thorax response was evaluated with peak chest acceleration, the Combined Thoracic Index (CTI), sternal deflection, chest deflection, and chest acceleration- 3 ms clip. The lumbar spine response was evaluated with lumbar spine force. Finally the lower extremity response was evaluated by femur and tibia force. The results of the simulation comparisons indicate the THUMS model had a similar response to the Hybrid III dummy given the same input. The primary difference seen between the two was a more flexible response of the THUMS compared to the Hybrid III. This flexibility was most

  12. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS : Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described. The document concludes with an evaluation of the potential effects that could result from implementing proposed actions. The conclusions are based on evaluation of existing data, utilization of numerical models, and application of logical inference. This volume contains the appendices.

  13. Advanced Neutron Source enrichment study. Volume 2: Appendices -- Final report, Revision 12/94

    International Nuclear Information System (INIS)

    Bari, R.A.; Ludewig, H.; Weeks, J.

    1994-01-01

    A study has been performed of the impact on performance of using low enriched uranium (20% 235 U) or medium enriched uranium (35% 235 U) as an alternative fuel for the Advanced Neutron Source, which is currently designed to use uranium enriched to 93% 235 U. Higher fuel densities and larger volume cores were evaluated at the lower enrichments in terms of impact on neutron flux, safety, safeguards, technical feasibility, and cost. The feasibility of fabricating uranium silicide fuel at increasing material density was specifically addressed by a panel of international experts on research reactor fuels. The most viable alternative designs for the reactor at lower enrichments were identified and discussed. Several sensitivity analyses were performed to gain an understanding of the performance of the reactor at parametric values of power, fuel density, core volume, and enrichment that were interpolations between the boundary values imposed on the study or extrapolations from known technology. Volume 2 of this report contains 26 appendices containing results, meeting minutes, and fuel panel presentations. There are 26 appendices in this volume

  14. Appendiceal-sigmoid fistula presenting in a man with ulcerative colitis: a case report

    Directory of Open Access Journals (Sweden)

    Minutolo Vincenzo

    2010-07-01

    Full Text Available Abstract Introduction Ulcerative colitis is a chronic disease characterized by diffuse mucosal inflammation limited to the colon. It mostly affects young adults, yet a large number of middle-aged and older patients with ulcerative colitis have also been reported. Case presentation A 58-year-old Caucasian man presented to our hospital in August 2006 with continuous and diffuse abdominal pain, meteorism, fever and bloody diarrhea. He had a two-year history of ulcerative colitis. Our patient was treated with intravenous medical therapy. As his condition worsened, he underwent surgery. An explorative laparotomy revealed that the entire colon was distended and pus was found around an appendiceal-sigmoid fistula. Conclusions Therapy for ulcerative colitis is a rapidly evolving field, with many new biological agents under investigation that are likely to change therapeutic strategies radically in the next decade. Indications for surgery are intractability (49%, stricture, dysplasia, toxic colitis, hemorrhage and perforation. To the best of our knowledge, this is the first case of an appendiceal-sigmoid fistula in a patient affected by ulcerative colitis reported in the literature. Fistulae between the appendix and the sigmoid tract are rarely reported in cases of diverticular disease and appendicitis.

  15. 1992 Columbia River salmon flow measures Options Analysis/EIS: Appendices

    International Nuclear Information System (INIS)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described. The document concludes with an evaluation of the potential effects that could result from implementing proposed actions. The conclusions are based on evaluation of existing data, utilization of numerical models, and application of logical inference. This volume contains the appendices

  16. Risk of appendiceal endometriosis among women with deep-infiltrating endometriosis.

    Science.gov (United States)

    Moulder, Janelle K; Siedhoff, Matthew T; Melvin, Kathryn L; Jarvis, Elizabeth G; Hobbs, Kumari A; Garrett, Joanne

    2017-11-01

    To determine whether deep-infiltrating endometriosis (DE) carries an increased risk of appendiceal endometriosis (AppE) as compared with superficial endometriosis or no endometriosis. In a retrospective study, data were obtained by chart review of an internal database for women who underwent coincidental appendectomy during benign gynecologic surgery between July 2009 and February 2014 at a tertiary referral center in the USA. Univariate, bivariate, and regression analyses were performed. The primary exposure was surgically documented endometriosis (DE, superficial, or no endometriosis). The primary outcome was AppE. Endometriosis was diagnosed for 151 (38.2%) of 395 women; 82 (54.3%) had DE. The prevalence of AppE was 13.2% (52/395) overall; 8 (11.6%) of 69 women with superficial endometriosis and 32 (39.0%) of 82 with DE were affected. Frequency of AppE was increased among women with DE, abnormal appendix appearance, and surgical indication (all Pendometriosis, controlling for appendiceal appearance and surgical indication, and a 2.7-fold (95% CI 1.2-6.2) higher risk of AppE compared with those with superficial endometriosis. Women with DE have increased risk of AppE. Coincidental appendectomy should form part of complete endometriosis excision for these patients. © 2017 International Federation of Gynecology and Obstetrics.

  17. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  18. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ... a Federal permit is issued that allows such activities. The ESA law requires that we invite public... laws and regulations. We will not consider or include in our administrative record comments we receive....) held in zoos in the United States to the Department of Anthropology, University of Cambridge, Cambridge...

  19. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  20. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  1. 43 CFR 13.2 - Application for permit.

    Science.gov (United States)

    2010-10-01

    ..., Education, and Welfare under the Randolph-Sheppard Vending Stand Act may apply for permits to establish and maintain vending facilities, including both vending stands and machines, to be operated by blind persons... Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND...

  2. 76 FR 14650 - Endangered Species; Permit No. 13330-01

    Science.gov (United States)

    2011-03-17

    ... Atmospheric Administration (NOAA), Commerce. ACTION: Notice; receipt of modification request. SUMMARY: Notice is hereby given the following applicant has applied in due form for a modification to a permit... Smart Position Only Transmitting (SPOT) tags. Sampling also includes a small genetic tissue fin clip and...

  3. 50 CFR 622.4 - Permits and fees.

    Science.gov (United States)

    2010-10-01

    ... organization. (C) Information concerning vessels, harvesting gear/methods, or fishing areas, as specified on... inspection; (3) Discusses possible hazards to safe navigation or hindrance to vessel traffic, traditional... upon the permitted vessel and/or captain, as appropriate, being included in an active survey frame for...

  4. 78 FR 4162 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-18

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and..., Greer, SC; PRT-89822A The applicant requests a permit to import a sport-hunted trophy of two male... import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive...

  5. 75 FR 52971 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-08-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a... applicant requests a permit to re-export a sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  6. The American experience of negotiable permits to combat air pollution

    International Nuclear Information System (INIS)

    Gros, Ch.

    2001-01-01

    Negotiable permits have been used in various fields, but the system in which they have seen greatest use is undoubtedly the American system of negotiable permits to fight acid rain. Since the 1970's, the United States have introduced elements of flexibility into their policy for fighting atmospheric pollution. These elements have included the family of negotiable permits. However, it was only in 1990 during the vote to amend the law on air cleanliness that a genuine market for the rights to emit SO 2 was set up (taking effect on january 1. 1995). This article analyses this context in order to understand why and how such an instrument has been introduced, and goes on to present the results. (author)

  7. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  8. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  9. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  10. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  11. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  12. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  13. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  14. Australian mineral industry annual review 1977 (including information to June 1978)

    Energy Technology Data Exchange (ETDEWEB)

    Ward, J

    1979-01-01

    This article records growth of the Australian mineral industry and reports production, consumption, treatment, trade, prices, new developments, exploration, and resources for all mineral commodities including fuels. Equivalent development abroad is summarized. Appendices include principal mineral producers, associations, etc. and royalties. Black coal is described under the headings: production, ex-mine value of output, employment, wages and salaries, production per manshift, interstate trade, port facilities, consumption, stock, prices, new developments, exploration, resources, world review, and coke. There are numerous tables of data and a flow chart of the Australian black coal industry, 1977. Brown coal includes production, consumption, new developments, exploration, resources, and world review.

  15. Appendices section

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2018-04-01

    The last chapter presents some papers related to the subject of the book. They are: 1) Some practical samples of defence in depth analysis for category IV gamma irradiators and 2) Interaction of both gamma radiation and X-rays with matter. A Sample of a manual and of a checklist for weekly maintenance; Sample of a manual and of checklist for monthly maintenance; Sample of a manual and of a checklist for quarterly, semiannual and yearly maintenance; Spreadsheet for a shield survey of a JS 8900 irradiator made by MDS Nordion (Canada); Sample of a water monitoring spreadsheet and two more papers: 1) A commercial game redesigned to aid in the teaching of radioprotection and 2) Recollecting concepts of radioprotection by applying a redesigned commercial game.

  16. Appendices section

    International Nuclear Information System (INIS)

    2018-01-01

    The last chapter presents some papers related to the subject of the book. They are: 1) Some practical samples of defence in depth analysis for category IV gamma irradiators and 2) Interaction of both gamma radiation and X-rays with matter. A Sample of a manual and of a checklist for weekly maintenance; Sample of a manual and of checklist for monthly maintenance; Sample of a manual and of a checklist for quarterly, semiannual and yearly maintenance; Spreadsheet for a shield survey of a JS 8900 irradiator made by MDS Nordion (Canada); Sample of a water monitoring spreadsheet and two more papers: 1) A commercial game redesigned to aid in the teaching of radioprotection and 2) Recollecting concepts of radioprotection by applying a redesigned commercial game

  17. Characterization of Class A low-level radioactive waste 1986--1990. Volume 7: Appendices K--P

    Energy Technology Data Exchange (ETDEWEB)

    Dehmel, J.C.; Loomis, D.; Mauro, J. [S. Cohen & Associates, Inc., McLean, VA (United States); Kaplan, M. [Eastern Research Group, Inc., Lexington, MA (United States)

    1994-01-01

    Under contract to the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, the firms of S. Cohen & Associates, Inc. (SC&A) and Eastern Research Group (ERG) have compiled a report that describes the physical, chemical, and radiological properties of Class-A low-level radioactive waste. The report also presents information characterizing various methods and facilities used to treat and dispose non-radioactive waste. A database management program was developed for use in accessing, sorting, analyzing, and displaying the electronic data provided by EG&G. The program was used to present and aggregate data characterizing the radiological, physical, and chemical properties of the waste from descriptions contained in shipping manifests. The data thus retrieved are summarized in tables, histograms, and cumulative distribution curves presenting radionuclide concentration distributions in Class-A waste as a function of waste streams, by category of waste generators, and regions of the United States. The report also provides information characterizing methods and facilities used to treat and dispose non-radioactive waste, including industrial, municipal, and hazardous waste regulated under Subparts C and D of the Resource Conservation and Recovery Act (RCRA). The information includes a list of disposal options, the geographical locations of the processing and disposal facilities, and a description of the characteristics of such processing and disposal facilities. Volume 1 contains the Executive Summary, Volume 2 presents the Class-A waste database, Volume 3 presents the information characterizing non-radioactive waste management practices and facilities, and Volumes 4 through 7 contain Appendices A through P with supporting information.

  18. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  19. New York City School Survey 2008-2010: Assessing the Reliability and Validity of a Progress Report Measure. Technical Appendices

    Science.gov (United States)

    Nathanson, Lori; Cole, Rachel; Kemple, James J.; Lent, Jessica; McCormick, Meghan; Segeritz, Micha

    2013-01-01

    The Research Alliance for New York City Schools examined Department of Education (DOE) School Survey data from 2008-2010 to better understand the richness and complexities of the information elicited by the Survey from parents, students, and teachers. This document provides the appendices to the technical report "New York City School Survey…

  20. Siting, design and cost of shallow land burial facilities in Northern New England. Volume 2. Appendices A-G

    International Nuclear Information System (INIS)

    1985-05-01

    Volume 2 comprises the following Appendices: Existing Environmental Data Base in Maine; Wetland Definition and Classification; Marine Clay; Screening Study; Basal Till Screening Study; Engineering Design Specifications and Costing; New York State Low-Level Radioactive Waste Management; and Maine Yankee's Cost of Low-Level Waste Disposal - 1973-1983

  1. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  2. Studies and analyses of the management of scientific research and development, including implementation and application at NASA centers

    Science.gov (United States)

    Rubenstein, A. H.

    1975-01-01

    Summary results obtained through the Program of Research on the Management of Research and Development (POMRAD) were presented. The nature of the overall program and the specific projects undertaken were described. Statistical data is also given concerning the papers, publications, people, and major program areas associated with the program. The actual list of papers, names of doctoral and masters theses, and other details of the program are included as appendices.

  3. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  4. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  5. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  6. Electric and Magnetic Fields (EMF) RAPID Program Engineering Project 8: FINAL REPORT, Evaluation of Field Reduction Technologies, Volume 1 (Report) and Volume 2 (Appendices)

    Energy Technology Data Exchange (ETDEWEB)

    Commonwealth Associates, Inc.; IIT Research Institute

    1997-08-01

    This draft report consists of two volumes. Volume 1, the main body, contains an introducto~ sectionj an overview of magnetic fields sectio~ and field reduction technology evaluation section. Magnetic field reduction methods are evalpated for transmission lines, distribution Iines,sulxtations, building wiring applkmd machinery, and transportation systems. The evaluation considers effectiveness, co% and other ftiors. Volume 2 contains five appendices, Append~ A presents magnetic field shielding information. Appendices B and C present design assumptions and magnetic field plots for transmission and distribution lines, respectively. Appendices D and E present cost estimate details for transmission and distribution limes, respectively.

  7. Research reactor core conversion guidebook. V. 3: Analytical verification (Appendices G and H)

    International Nuclear Information System (INIS)

    1992-04-01

    Volume 3 consists of Appendix G which contains detailed results of a safety-related benchmark problem for an idealized reactor and Appendix H which contains detailed comparisons of calculated and measured data for actual cores with moderately enriched uranium and low enriched uranium fuels. The results of the benchmark calculations in Appendix G are summarized in Chapter 7 of Volume 1 and the results of the comparisons between calculations and measurements are summarized in Chapter 8 of Volume 1. Both the approaches described in these appendices are very useful in ensuring that the calculational methods employed in the preparation of a Safety Report are accurate. As a first step, it is recommended that reactor operators/physicists use their own methods and codes to first calculate the benchmark problem, and then compare the results of calculations with measurements in their own reactor or in one of the reactors for which measured data is available in Appendix H. (author). Refs, figs and tabs

  8. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Second Results Report and Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Chandler, K.

    2011-10-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This is the second results report for the AT fuel cell bus since it was placed in service, and it focuses on the newest data analysis and lessons learned since the previous report. The appendices, referenced in the main report, provide the full background for the evaluation. They will be updated as new information is collected but will contain the original background material from the first report.

  9. Waste-Management Education and Research Consortium (WERC) annual progress report, 1992--1993. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-15

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineeringat New Mexico State University; Appendix D - Non-degree Certificate program; Appendix E - Curriculum for Associate Degree Program in Radioactive & Hazardous Waste Materials; Appendix F - Curriculum for NCC Program in Earth & Environmental Sciences; Appendix G - Brochure of 1992 Teleconference Series; Appendix H - Sites for Hazardous/Radioactive Waste Management Series; Appendix I - WERC Interactive Television Courses; Appendix J - WERC Research Seminar Series Brochures; Appendix K - Summary of Technology Development of the Third Year; Appendix L - List of Major Publications Resulting From WERC; Appendix M - Types of Equipment at WERC Laboratories; and Appendix N - WERC Newsletter Examples.

  10. US Fish and Wildlife Service biomonitoring operations manual, Appendices A--K

    Energy Technology Data Exchange (ETDEWEB)

    Gianotto, D.F.; Rope, R.C.; Mondecar, M.; Breckenridge, R.P.; Wiersma, G.B.; Staley, C.S.; Moser, R.S.; Sherwood, R.; Brown, K.W.

    1993-04-01

    Volume 2 contains Appendices and Summary Sheets for the following areas: A-Legislative Background and Key to Relevant Legislation, B- Biomonitoring Operations Workbook, C-Air Monitoring, D-Introduction to the Flora and Fauna for Biomonitoring, E-Decontamination Guidance Reference Field Methods, F-Documentation Guidance, Sample Handling, and Quality Assurance/Quality Control Standard Operating Procedures, G-Field Instrument Measurements Reference Field Methods, H-Ground Water Sampling Reference Field Methods, I-Sediment Sampling Reference Field Methods, J-Soil Sampling Reference Field Methods, K-Surface Water Reference Field Methods. Appendix B explains how to set up strategy to enter information on the ``disk workbook``. Appendix B is enhanced by DE97006389, an on-line workbook for users to be able to make revisions to their own biomonitoring data.

  11. Ileocecal Burkitt's Lymphoma Presenting as Ileocolic Intussusception With Appendiceal Invagination and Acute Appendicitis

    Directory of Open Access Journals (Sweden)

    Sheng-Mine Wang

    2010-06-01

    Full Text Available Intussusception is a common cause of abdominal pain in children. Although most cases are idiopathic, about 10% of cases have a pathologic lead point. Burkitt's lymphoma is not a common etiology. Burkitt's lymphoma might present primarily as intussusception in children but has rarely been associated with appendicitis. We report a case in which a 10-year-old obese boy who initially presented with acute appendicitis due to ileocolic intussusception with appendiceal invagination. He underwent one-trocar laparoscopy and antibiotic treatment. The symptoms recurred 10 days after discharge. Colonoscopy disclosed ileocecal Burkitt's lymphoma as the pathological lead point. This case emphasizes the importance of the age of the patient and the anatomic location of the intussusception related to possible etiology, and hence the most appropriate surgical procedure.

  12. Acute appendiceal abscess and atraumatic splenic rupture: A case of dual pathology.

    Science.gov (United States)

    Ananthavarathan, Piriyankan; Patel, Kamlesh; Doran, Catherine; Suggett, Nigel

    2016-01-01

    Atraumatic splenic rupture is a rare surgical emergency that is often attributed to neoplastic or infectious causes. Rarely, it has been identified to also occur in the setting of an acute severe sepsis and in cases of pelvic or splenic abscess formation post-appendicectomy. However, to our knowledge, the co-presentation of acute appendiceal abscess and splenic rupture has not been previously described. We present the case of a 67-year old male with decompensating haemorrhagic shock secondary to atraumatic splenic rupture on a background of an inadequately treated complicated appendicitis originally managed as diverticulitis with antibiotics in the community. Intra-operatively, in addition to a de-gloved, ruptured spleen; an acutely inflamed appendiceal abscess was also identified. A concomitant splenectomy, washout and appendicectomy and was therefore performed. Histopathological examination revealed a normal spleen with a stripped capsular layer. Mucosal ulceration, transmural inflammation and serositis of the appendix appeared to be consistent with acute appendicitis. Our case demonstrates how inadequately treated sepsis may predispose to an acute presentation of splenic rupture with associated haemorrhagic shock; which may initially be interpreted as septic shock. However, we demonstrate how insults such as sepsis and haemorrhagic shock may co-exist warranting careful consideration of possible dual pathologies in complex presentations which may be life-threatening. While the causal relationship between acute appendicitis and atraumatic spontaneous splenic rupture remains unclear, our case considers and highlights the importance of considering dual pathology in patients presenting in the acute setting. Copyright © 2016. Published by Elsevier Ltd.

  13. Rate of Appendiceal Metastasis with Non-Serous Epithelial Ovarian Cancer in Manitoba.

    Science.gov (United States)

    Altman, Alon D; Lefas, Georgia; Power, Laura; Lambert, Pascal; Lotocki, Robert; Dean, Erin; Nachtigal, Mark W

    2018-02-01

    This study sought to evaluate the rate of appendiceal involvement in non-serous mucinous and endometrioid-associated epithelial ovarian cancers. The Manitoba Cancer Registry and CancerCare database were used to find all women with non-serous epithelial ovarian, fallopian tube, or primary peritoneal cancer between 1995 and 2011. All patients with an appendectomy were then identified, and their final pathology findings were reviewed. Women who did not receive treatment or lacked follow-up were excluded. We identified 338 patients from 1995-2011 with no prior appendectomy. Of these, 16.6% received an appendectomy, and 22.8% were clinically evaluated. Most cases within this cohort were mucinous (62%) and stage 1 (63%). Four appendiceal metastases were identified (7.2%), and one half appeared clinically normal at the time of surgery (3.6%). Within the mucinous histologic type, 32.7% of patients received an appendectomy, with a metastatic rate of 5.7%. Of the 127 endometrioid cases, only 10 patients received an appendectomy, and 2 were found to have metastases. No metastases were found in the 85 patients in the clear cell cohort, only 5 of whom received an appendectomy. Routine appendectomy or clinical assessment of the appendix is valuable for all non-serous ovarian cancers. The rate of involvement for endometriosis-associated ovarian cancers may be significantly higher than expected, and further studies need to be conducted. Copyright © 2018 Society of Obstetricians and Gynaecologists of Canada. Published by Elsevier Inc. All rights reserved.

  14. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  15. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  16. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  17. 32 CFR 935.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ... shall be issued under other authority that is inconsistent with this part. The Commander may issue.... (b) To the extent it is not inconsistent with this part, any permit or registration issued pursuant...

  18. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  19. 50 CFR 660.707 - Permits.

    Science.gov (United States)

    2010-10-01

    ... or downloaded from the Southwest Region home page (http://swr.nmfs.noaa.gov/permits.htm) to apply for... the vessel is fishing for, taking, retaining, possessing, or landing HMS shoreward of the outer...

  20. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... the logistical and cost concerns regarding the ability of the railroad industry to comply with the... incorporating the applicable GRL Special Permits into the HMR (and FRA's subsequent approval notice) those...

  1. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  2. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  3. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  4. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  5. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  6. 75 FR 47825 - Emergency Exemption; Issuance of Emergency Permit to Rehabilitate Sea Turtles Affected by the...

    Science.gov (United States)

    2010-08-09

    ...] Emergency Exemption; Issuance of Emergency Permit to Rehabilitate Sea Turtles Affected by the Deepwater... threaten the Gulf of Mexico environment and its inhabitants, including five sea turtle species. We, the U.S...) permit, to aid sea turtles affected by the oil spill. ADDRESSES: Documents and other information...

  7. 77 FR 46514 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-03

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... a permit to export the sport-hunted trophy of one male Addax (Addax nasomaculatus) culled from a... permit to export the sport-hunted trophy of one male Addax (Addax nasomaculatus) culled from a captive...

  8. 77 FR 22604 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-04-16

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... zoological exhibition. Multiple Applicants The following applicants each request a permit to import the sport... requesting no changes to his permit but an extension of time to allow him to complete a study to archive and...

  9. 40 CFR 60.4122 - Information requirements for Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Information requirements for Hg budget... requirements for Hg budget permit applications. A complete Hg Budget permit application shall include the following elements concerning the Hg Budget source for which the application is submitted, in a format...

  10. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Science.gov (United States)

    2012-02-29

    ..., pollution prevention, water quality-based requirements, inspections, corrective action, and permit... industry on December 1, 2009. The permit also includes new water quality-based requirements for... Mexico, Indian Country Lands, Puerto Rico, Washington, DC, and U.S. territories and protectorates. DATES...

  11. New seismograph includes filters

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-02

    The new Nimbus ES-1210 multichannel signal enhancement seismograph from EG and G geometrics has recently been redesigned to include multimode signal fillers on each amplifier. The ES-1210F is a shallow exploration seismograph for near subsurface exploration such as in depth-to-bedrock, geological hazard location, mineral exploration, and landslide investigations.

  12. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A

    International Nuclear Information System (INIS)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-01-01

    This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest

  13. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A

    Energy Technology Data Exchange (ETDEWEB)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-07-01

    This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from

  14. Analytic device including nanostructures

    KAUST Repository

    Di Fabrizio, Enzo M.; Fratalocchi, Andrea; Totero Gongora, Juan Sebastian; Coluccio, Maria Laura; Candeloro, Patrizio; Cuda, Gianni

    2015-01-01

    A device for detecting an analyte in a sample comprising: an array including a plurality of pixels, each pixel including a nanochain comprising: a first nanostructure, a second nanostructure, and a third nanostructure, wherein size of the first nanostructure is larger than that of the second nanostructure, and size of the second nanostructure is larger than that of the third nanostructure, and wherein the first nanostructure, the second nanostructure, and the third nanostructure are positioned on a substrate such that when the nanochain is excited by an energy, an optical field between the second nanostructure and the third nanostructure is stronger than an optical field between the first nanostructure and the second nanostructure, wherein the array is configured to receive a sample; and a detector arranged to collect spectral data from a plurality of pixels of the array.

  15. Saskatchewan resources. [including uranium

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The production of chemicals and minerals for the chemical industry in Saskatchewan are featured, with some discussion of resource taxation. The commodities mentioned include potash, fatty amines, uranium, heavy oil, sodium sulfate, chlorine, sodium hydroxide, sodium chlorate and bentonite. Following the successful outcome of the Cluff Lake inquiry, the uranium industry is booming. Some developments and production figures for Gulf Minerals, Amok, Cenex and Eldorado are mentioned.

  16. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  17. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  18. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  19. The development of coal-based technologies for Department of Defense facilities. Volume 2, Appendices. Semiannual technical progress report, September 28, 1994--March 27, 1995

    International Nuclear Information System (INIS)

    Miller, B.G.; Bartley, D.A.; Hatcher, P.

    1996-01-01

    This semiannual progress report contains the following appendices: description of the 1,000 lb steam/h watertube research boiler; the Pennsylvania CGE model; Phase II, subtask 3.9 coal market analysis; the CGE model; and sector definition

  20. Probabilistic production simulation including CHP plants

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, H.V.; Palsson, H.; Ravn, H.F.

    1997-04-01

    A probabilistic production simulation method is presented for an energy system containing combined heat and power plants. The method permits incorporation of stochastic failures (forced outages) of the plants and is well suited for analysis of the dimensioning of the system, that is, for finding the appropriate types and capacities of production plants in relation to expansion planning. The method is in the tradition of similar approaches for the analysis of power systems, based on the load duration curve. The present method extends on this by considering a two-dimensional load duration curve where the two dimensions represent heat and power. The method permits the analysis of a combined heat and power system which includes all the basic relevant types of plants, viz., condensing plants, back pressure plants, extraction plants and heat plants. The focus of the method is on the situation where the heat side has priority. This implies that on the power side there may be imbalances between demand and production. The method permits quantification of the expected power overflow, the expected unserviced power demand, and the expected unserviced heat demand. It is shown that a discretization method as well as double Fourier series may be applied in algorithms based on the method. (au) 1 tab., 28 ills., 21 refs.

  1. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  2. Being Included and Excluded

    DEFF Research Database (Denmark)

    Korzenevica, Marina

    2016-01-01

    Following the civil war of 1996–2006, there was a dramatic increase in the labor mobility of young men and the inclusion of young women in formal education, which led to the transformation of the political landscape of rural Nepal. Mobility and schooling represent a level of prestige that rural...... politics. It analyzes how formal education and mobility either challenge or reinforce traditional gendered norms which dictate a lowly position for young married women in the household and their absence from community politics. The article concludes that women are simultaneously excluded and included from...... community politics. On the one hand, their mobility and decision-making powers decrease with the increase in the labor mobility of men and their newly gained education is politically devalued when compared to the informal education that men gain through mobility, but on the other hand, schooling strengthens...

  3. Challenges to IPPC-B permitting at LGU in Macedonia

    International Nuclear Information System (INIS)

    Nikolov, Marjan

    2006-01-01

    The debate will soon turn to discussion of the arrangements between the environmental protection administration (both central and local), the LGU and ZELS and businesses in order to implement the Law on environment. Of special importance will be development of environment for IPPC-B permitting at the LGU including all stakeholders. The Ministry of Environment and Physical Planning-MEPP must clarify the interface between the responsibilities of the Environmental Protection Administration and those of the LGU.

  4. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  5. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  6. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  7. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  8. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  9. Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, Sharon; Previsic, Mirko; Nelson, Peter; Woo, Sheri

    2010-06-17

    Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal

  10. GPU v. B and W lawsuit review and its effect on TMI-1 (Docket 50-289). Volume 2. Appendices

    International Nuclear Information System (INIS)

    1983-09-01

    Volume II of the GPU v. B and W lawsuit review contains four appendices supporting the review of the GPU v. B and W lawsuit discussed in Volume I of this report. As outlined in the Background section of Volume I under (3) Review Method Utilized by the Staff, the GPU v. B and W lawsuit review was partitioned into 10 categories. The 154 certification items and the 19 long-term actions (hearing items or restart issues) resulting from Commission Orders and the hearing process were each placed in one or more of the 10 categories. These appendices contain the hearing items by category; lawsuit record by category; category location matrix for lawsuit record; and uncategorized lawsuit record

  11. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  12. Comment Hobbes tente de rendre son matérialisme acceptable dans les appendices du Léviathan

    Directory of Open Access Journals (Sweden)

    Anne Staquet

    2011-11-01

    Full Text Available Le Léviathan de Hobbes [1651] a subi de nombreuses attaques, au point qu’il est jugé responsable de la grande peste de 1665 et de l’incendie de Londres l’année suivante et que le parlement ouvre une procédure contre l’ouvrage. Aussi, lorsqu’en 1666, Thomas Hobbes veut publier la traduction latine de ce livre, il y adjoint trois appendices. La version latine de l’œuvre est généralement jugée plus acceptable que le texte originaire anglais. En étudiant la manière dont Hobbes traite de son matérialisme dans ces appendices, je tente de montrer que les addenda latins ne constituent en aucune manière un retour en arrière du texte, mais que le philosophe enrobe simplement davantage des propos que, par ailleurs, il rend plus radicaux.Hobbes’s Leviathan [1651] has been critiqued so much that it was held responsible for the Great Plague of 1665 and the Fire of London during the following year, resulting in the Parliament instituting proceedings against the book. Therefore, when in 1666 Thomas Hobbes wanted to publish a Latin translation of this book, he added three appendices. Generally, the Latin version of the work is considered more acceptable than the English original text. By studying how Hobbes deals with his materialism in these appendices, I try to show that the Latin additions are in no way a reversal of the text, but that the philosopher simply veiled more propositions, while at the same time making them more radical.

  13. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  14. Final Generic Environmental Impact Statement. Handling and storage of spent light water power reactor fuel. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1979-08-01

    This volume contains the following appendices: LWR fuel cycle, handling and storage of spent fuel, termination case considerations (use of coal-fired power plants to replace nuclear plants), increasing fuel storage capacity, spent fuel transshipment, spent fuel generation and storage data, characteristics of nuclear fuel, away-from-reactor storage concept, spent fuel storage requirements for higher projected nuclear generating capacity, and physical protection requirements and hypothetical sabotage events in a spent fuel storage facility

  15. BPA/Lower Valley transmission project. Final environmental impact statement. Appendices A, B, D, E, G-N

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendices A, B, D, E, G--N

  16. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  17. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  18. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  19. Automatic Traffic Advisory and Resolution Service (ATARS) Algorithms Including Resolution-Advisory-Register Logic. Volume 2. Sections 12 through 19. Appendices,

    Science.gov (United States)

    1981-06-01

    resolution advisory data set; ZZITIP (all. resolution advisory data sets processed); ZIP (TRADS.IEI? 12 ST292) UI!j (VMD(TRADS.INDZI3) 9T ISEP -2) 111TRIDS.FE...PROCES featurePSBPGESP2; ZL. (NIXSEPS. NAMKSPO, SMPS, SZP20); ISEPS =0; RAISMP 0; LOOP; Get the next BADS; rYITI’ (all RIDS processed); U...THIDS.PEATBITS(l) 12 ST202) In~ (TRADS..PUJTBITS(2) X2 $TRE) J (TRADS.MTITS(3) f& STU)) :MLV I (TRIDS.SIYGLE .1 SU) THlEY ISEPS = NIQIAIS!PS.PSZP2 (TRIOS

  20. MOS modeling hierarchy including radiation effects

    International Nuclear Information System (INIS)

    Alexander, D.R.; Turfler, R.M.

    1975-01-01

    A hierarchy of modeling procedures has been developed for MOS transistors, circuit blocks, and integrated circuits which include the effects of total dose radiation and photocurrent response. The models were developed for use with the SCEPTRE circuit analysis program, but the techniques are suitable for other modern computer aided analysis programs. The modeling hierarchy permits the designer or analyst to select the level of modeling complexity consistent with circuit size, parametric information, and accuracy requirements. Improvements have been made in the implementation of important second order effects in the transistor MOS model, in the definition of MOS building block models, and in the development of composite terminal models for MOS integrated circuits

  1. 616 Nonradioactive Dangerous Waste Storage Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this storage unit, including the Part A included with this document, is provided at the beginning of the Part A Section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings. The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application (Revision 0) was submitted to the Washington State Department of Ecology and the US Environmental Protection Agency on July 31, 1989. Revision 1, addressing Washington State Department of Ecology review comments made on Revision 0 dated November 21, 1989, and March 23, 1990, was submitted on June 22, 1990. This submittal, Revision 2, addresses Washington State Department of Ecology review comments made on Revision 1, dated June 22, 1990, August 30, 1990, December 18, 1990, and July 8, 1991

  2. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  3. Can a carbon permit system reduce Spanish unemployment?

    International Nuclear Information System (INIS)

    Faehn, Taran; Gomez-Plana, Antonio G.; Kverndokk, Snorre

    2009-01-01

    This paper analyses the impact of carbon policy on unemployment in Spain and whether recycling the public revenues earned from permit auctions can alleviate this problem. While Spain's deviation from the European Union's intermediate emission goals is more serious than most other member countries' unemployment in Spain is also well above average for the European Union. We use a computable general equilibrium model that includes unemployment in the markets for unskilled and skilled labour. We find that introducing carbon permits does not aggravate Spanish unemployment. In fact, if supplied with revenue recycling schemes, unemployment rates may actually fall. Contrary to other European studies, we find that the best option is to reduce payroll taxes on relatively skilled types of labour. This reform is successful in both increasing labour demand and dampening the supply response to rising wages. However, while all of the recycling schemes generate dividends in terms of aggregate welfare, none entirely offsets the abatement costs. (author)

  4. 77 FR 47380 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges From...

    Science.gov (United States)

    2012-08-08

    ... test fluids, sanitary waste, domestic waste and miscellaneous discharges is authorized. More stringent... permit. Major changes also include definition of ``operator'', acute toxicity test for produced water, spill prevention best management practices, and electronic reporting requirements. To obtain discharge...

  5. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  6. Hanford facility dangerous waste permit application, 616 Nonradioactive Dangerous Waste Storage Facility. Revision 2A

    International Nuclear Information System (INIS)

    Bowman, R.C.

    1994-04-01

    This permit application for the 616 Nonradioactive Dangerous Waste Storage Facility consists for 15 chapters. Topics of discussion include the following: facility description and general provisions; waste characteristics; process information; personnel training; reporting and record keeping; and certification

  7. 76 FR 10623 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-02-25

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  8. 77 FR 58405 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-20

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... species. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  9. 76 FR 30386 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-05-25

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Applicant: Mary Hunt, Edmore, MI; PRT-42976A The applicant requests a permit to import a sport-hunted trophy...

  10. 77 FR 12870 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-02

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... propagation. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  11. 75 FR 62139 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-07

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  12. 76 FR 48880 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-09

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  13. 78 FR 37562 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2013-06-21

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  14. 26 CFR 1.401(l)-5 - Overall permitted disparity limits.

    Science.gov (United States)

    2010-04-01

    ... permitted disparity limits. (a) Introduction—(1) In general. The maximum excess allowance and maximum offset... Commissioner considers appropriate. Additional rules may include (without being limited to) rules for computing...

  15. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  16. Backfilling and sealing of tunnels, shafts and boreholes. Volume 2: Appendices

    International Nuclear Information System (INIS)

    Studer, J.; Ammann, W.; Meier, P.; Mueller, Ch.; Glauser, E.

    1984-12-01

    The present report is a synthesis of the state of knowledge regarding backfilling and sealing of nuclear waste repositories. It is based on an evaluation of both the general and special publications concerning this problem (articles in scientific journals, research reports, conference papers and textbooks) and represents the state of knowledge up to summer 1984. In addition, it contains an outlook on the continuing work. This will serve to broaden the scientific base and to achieve the technical as well as economical optimization. The report consists of two volumes: Volume 1 Main Part, Volume 2 Appendices. Starting with the functions of backfilling and sealing in the safety concept assessment criteria and from these, taking into consideration the given conditions in the project 'Gewaehr 1985' ('Guarantee'), the requirements for the backfilling and sealing materials are formulated. The properties of several materials under consideration are discussed in the Appendix together with a detailed description of the most important of these materials. The reasons are given for the choice of the proposed materials for the project 'Gewaehr 1985'. Alternative backfilling and sealing concepts for repositories Type B and Type C are presented and reasons are given for the selected variants for the project 'Gewaehr 1985'. Chapter 10 represents a review of the report. This report is intended as a reference work for the corresponding chapters in the NGB reports (cf. /NGB 85-03, 1985/, /NGB 85-06, 1985/). (author)

  17. Analysis of core damage frequency: Peach Bottom, Unit 2 internal events appendices

    International Nuclear Information System (INIS)

    Kolaczkowski, A.M.; Cramond, W.R.; Sype, T.T.; Maloney, K.J.; Wheeler, T.A.; Daniel, S.L.

    1989-08-01

    This document contains the appendices for the accident sequence analysis of internally initiated events for the Peach Bottom, Unit 2 Nuclear Power Plant. This is one of the five plant analyses conducted as part of the NUREG-1150 effort for the Nuclear Regulatory Commission. The work performed and described here is an extensive reanalysis of that published in October 1986 as NUREG/CR-4550, Volume 4. It addresses comments from numerous reviewers and significant changes to the plant systems and procedures made since the first report. The uncertainty analysis and presentation of results are also much improved, and considerable effort was expended on an improved analysis of loss of offsite power. The content and detail of this report is directed toward PRA practitioners who need to know how the work was done and the details for use in further studies. The mean core damage frequency is 4.5E-6 with 5% and 95% uncertainty bounds of 3.5E-7 and 1.3E-5, respectively. Station blackout type accidents (loss of all ac power) contributed about 46% of the core damage frequency with Anticipated Transient Without Scram (ATWS) accidents contributing another 42%. The numerical results are driven by loss of offsite power, transients with the power conversion system initially available operator errors, and mechanical failure to scram. 13 refs., 345 figs., 171 tabs

  18. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives. (DMC)

  19. Analysis of core damage frequency, Surry, Unit 1 internal events appendices

    International Nuclear Information System (INIS)

    Bertucio, R.C.; Julius, J.A.; Cramond, W.R.

    1990-04-01

    This document contains the appendices for the accident sequence analyses of internally initiated events for the Surry Nuclear Station, Unit 1. This is one of the five plant analyses conducted as part of the NUREG-1150 effort by the Nuclear Regulatory Commission. NUREG-1150 documents the risk of a selected group of nuclear power plants. The work performed is an extensive reanalysis of that published in November 1986 as NUREG/CR-4450, Volume 3. It addresses comments from numerous reviewers and significant changes to the plant systems and procedures made since the first report. The uncertainty analysis and presentation of results are also much improved. The context and detail of this report are directed toward PRA practitioners who need to know how the work was performed and the details for use in further studies. The mean core damage frequency at Surry was calculated to be 4.0E-5 per year, with a 95% upper bound of 1.3E-4 and 5% lower bound of 6.8E-6 per year. Station blackout type accidents (loss of all AC power) were the largest contributors to the core damage frequency, accounting for approximately 68% of the total. The next type of dominant contributors were Loss of Coolant Accidents (LOCAs). These sequences account for 15% of core damage frequency. No other type of sequence accounts for more than 10% of core damage frequency

  20. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives

  1. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  2. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  3. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ...-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to take (capture...-listed Drosophila species on the island of Kauai in the State of Hawaii for the purpose of enhancing its... in the State of Hawaii: Astelia waialealae (painiu), Canavalia napaliensis (awikiwiki), Chamaesyce...

  4. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  5. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit. (a) An elephant, hippopotamus, rhinoceros, or tapir shall not be imported into the United States... export an elephant, hippopotamus, rhinoceros, or tapir to the United States; (2) The name and address of...

  6. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  7. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    ... an amount qualifying as hazardous material. (modes 1, 2, 3, 4) 15860-N......... Apple Inc. 49 CFR To... strength stiffness. 13581-M......... Bengal Products 49 CFR To modify the Inc. Baton 173.306(a)(3). special............ Carleton 49 CFR 173.302a To modify the Technologies special permit to Inc. (Former change a drawing Grantee...

  8. 50 CFR 648.4 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... carrying passengers for hire. (8) Atlantic bluefish vessels. (i) Commercial. Any vessel of the United... lands Atlantic bluefish in or from the EEZ in excess of the recreational possession limit specified at § 648.164 must have been issued and carry on board a valid commercial bluefish vessel permit. (ii) Party...

  9. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  10. 224-T Transuranic Waste Storage and Assay Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-01-01

    Westinghouse Hanford Company is a major contractor to the US Department of Energy Richland Field Office and serves as cooperator of the 224-T Transuranic Waste Storage and Assay Facility, the storage unit addressed in this permit application. At the time of submission of this portion of the Hanford Facility. Dangerous Waste Permit Application covering the 224-T Transuranic Waste Storage and Assay Facility, many issues identified in comments to the draft Hanford Facility Dangerous Waste Permit remain unresolved. This permit application reflects the positions taken by the US Department of Energy, Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application (Revision 0) consists of both a Part A and Part B permit application. An explanation of the Part A revisions associated with this unit, including the Part A revision currently in effect, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application contains information current as of March 1, 1992

  11. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  12. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  13. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  14. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  15. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  16. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 2 of 2: Appendices

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level. This report contains appendices A and B. Appendix A contains notices of preparation/notices of intent and EIR/EIS scoping comments. Appendix B contains GeothermEx, Inc., analysis of Geothermal Reservoir Effects and Induced Seismicity

  17. Robust, accurate, and non-contacting vibration measurement systems: Supplemental appendices presenting comparison measurements of the robust laser interferometer and typical accelerometer systems. Volume 2

    International Nuclear Information System (INIS)

    Goodenow, T.C.; Shipman, R.L.; Holland, H.M.

    1995-06-01

    Epoch Engineering, Incorporated (EEI) has completed a series of vibration measurements comparing their newly-developed Robust Laser Interferometer (RLI) with accelerometer-based instrumentation systems. EEI has successfully demonstrated, on several pieces of commonplace machinery, that non-contact, line-of-sight measurements are practical and yield results equal to or, in some cases, better than customary field implementations of accelerometers. The demonstration included analysis and comparison of such phenomena as nonlinearity, transverse sensitivity, harmonics, and signal-to-noise ratio. Fast Fourier Transformations were performed on the accelerometer and the laser system outputs to provide a comparison basis. The RLI was demonstrated, within the limits o the task, to be a viable, line-of-sight, non-contact alternative to accelerometer systems. Several different kinds of machinery were instrumented and. compared, including a small pump, a gear-driven cement mixer, a rotor kit, and two small fans. Known machinery vibration sources were verified and RLI system output file formats were verified to be compatible with commercial computer programs used for vibration monitoring and trend analysis. The RLI was also observed to be less subject to electromagnetic interference (EMI) and more capable at very low frequencies. This document, Volume 2, provides the appendices to this report

  18. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume contains appendices for the following: Rocky Flats Plant and Idaho National Engineering Laboratory waste process information; TRUPACT-II content codes (TRUCON); TRUPACT-II chemical list; chemical compatibility analysis for Rocky Flats Plant waste forms; chemical compatibility analysis for waste forms across all sites; TRU mixed waste characterization database; hazardous constituents of Rocky Flats Transuranic waste; summary of waste components in TRU waste sampling program at INEL; TRU waste sampling program; and waste analysis data

  19. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  20. Allocation of carbon permits within a country. A general equilibrium analysis of the United Kingdom

    International Nuclear Information System (INIS)

    Edwards, T.H.; Hutton, J.P.

    2001-01-01

    The Kyoto agreement includes international trade in carbon permits from 2008. We have used a CGE model to evaluate methods of allocating permits within the UK. Auctioning is broadly similar to a carbon tax, with revenues recycled to reduce other distortions. 'Grandfathering' some permits free to large firms would mean a loss of recycling and, possibly, give windfall profits to foreigners. Alternatively, regularly revised allocation, using 'best practice' estimates, would be similar to recycling revenue as an output subsidy. Such a system could allow much of the potential 'double dividend' to be realised, though an auction system might still be preferable

  1. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  2. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  3. Probabilistic accident consequence uncertainty analysis: Dispersion and deposition uncertainty assessment, appendices A and B

    International Nuclear Information System (INIS)

    Harper, F.T.; Young, M.L.; Miller, L.A.; Hora, S.C.; Lui, C.H.; Goossens, L.H.J.; Cooke, R.M.; Paesler-Sauer, J.; Helton, J.C.

    1995-01-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, completed in 1990, estimate the risks presented by nuclear installations based on postulated frequencies and magnitudes of potential accidents. In 1991, the US Nuclear Regulatory Commission (NRC) and the Commission of the European Communities (CEC) began a joint uncertainty analysis of the two codes. The objective was to develop credible and traceable uncertainty distributions for the input variables of the codes. Expert elicitation, developed independently, was identified as the best technology available for developing a library of uncertainty distributions for the selected consequence parameters. The study was formulated jointly and was limited to the current code models and to physical quantities that could be measured in experiments. To validate the distributions generated for the wet deposition input variables, samples were taken from these distributions and propagated through the wet deposition code model along with the Gaussian plume model (GPM) implemented in the MACCS and COSYMA codes. Resulting distributions closely replicated the aggregated elicited wet deposition distributions. Project teams from the NRC and CEC cooperated successfully to develop and implement a unified process for the elaboration of uncertainty distributions on consequence code input parameters. Formal expert judgment elicitation proved valuable for synthesizing the best available information. Distributions on measurable atmospheric dispersion and deposition parameters were successfully elicited from experts involved in the many phenomenological areas of consequence analysis. This volume is the second of a three-volume document describing the project and contains two appendices describing the rationales for the dispersion and deposition data along with short biographies of the 16 experts who participated in the project

  4. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Brown, J. [National Radiological Protection Board (United Kingdom); Goossens, L.H.J.; Kraan, B.C.P. [Delft Univ. of Technology (Netherlands)] [and others

    1997-06-01

    This volume is the second of a two-volume document that summarizes a joint project by the US Nuclear Regulatory and the Commission of European Communities to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This two-volume report, which examines mechanisms and uncertainties of transfer through the food chain, is the first in a series of five such reports. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain transfer that affect calculations of offsite radiological consequences. Seven of the experts reported on transfer into the food chain through soil and plants, nine reported on transfer via food products from animals, and two reported on both. The expert judgment elicitation procedure and its outcomes are described in these volumes. This volume contains seven appendices. Appendix A presents a brief discussion of the MAACS and COSYMA model codes. Appendix B is the structure document and elicitation questionnaire for the expert panel on soils and plants. Appendix C presents the rationales and responses of each of the members of the soils and plants expert panel. Appendix D is the structure document and elicitation questionnaire for the expert panel on animal transfer. The rationales and responses of each of the experts on animal transfer are given in Appendix E. Brief biographies of the food chain expert panel members are provided in Appendix F. Aggregated results of expert responses are presented in graph format in Appendix G.

  5. Probabilistic accident consequence uncertainty analysis: Dispersion and deposition uncertainty assessment, appendices A and B

    Energy Technology Data Exchange (ETDEWEB)

    Harper, F.T.; Young, M.L.; Miller, L.A. [Sandia National Labs., Albuquerque, NM (United States); Hora, S.C. [Univ. of Hawaii, Hilo, HI (United States); Lui, C.H. [Nuclear Regulatory Commission, Washington, DC (United States); Goossens, L.H.J.; Cooke, R.M. [Delft Univ. of Technology (Netherlands); Paesler-Sauer, J. [Research Center, Karlsruhe (Germany); Helton, J.C. [and others

    1995-01-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, completed in 1990, estimate the risks presented by nuclear installations based on postulated frequencies and magnitudes of potential accidents. In 1991, the US Nuclear Regulatory Commission (NRC) and the Commission of the European Communities (CEC) began a joint uncertainty analysis of the two codes. The objective was to develop credible and traceable uncertainty distributions for the input variables of the codes. Expert elicitation, developed independently, was identified as the best technology available for developing a library of uncertainty distributions for the selected consequence parameters. The study was formulated jointly and was limited to the current code models and to physical quantities that could be measured in experiments. To validate the distributions generated for the wet deposition input variables, samples were taken from these distributions and propagated through the wet deposition code model along with the Gaussian plume model (GPM) implemented in the MACCS and COSYMA codes. Resulting distributions closely replicated the aggregated elicited wet deposition distributions. Project teams from the NRC and CEC cooperated successfully to develop and implement a unified process for the elaboration of uncertainty distributions on consequence code input parameters. Formal expert judgment elicitation proved valuable for synthesizing the best available information. Distributions on measurable atmospheric dispersion and deposition parameters were successfully elicited from experts involved in the many phenomenological areas of consequence analysis. This volume is the second of a three-volume document describing the project and contains two appendices describing the rationales for the dispersion and deposition data along with short biographies of the 16 experts who participated in the project.

  6. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 2: Appendices

    International Nuclear Information System (INIS)

    Brown, J.; Goossens, L.H.J.; Kraan, B.C.P.

    1997-06-01

    This volume is the second of a two-volume document that summarizes a joint project by the US Nuclear Regulatory and the Commission of European Communities to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This two-volume report, which examines mechanisms and uncertainties of transfer through the food chain, is the first in a series of five such reports. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain transfer that affect calculations of offsite radiological consequences. Seven of the experts reported on transfer into the food chain through soil and plants, nine reported on transfer via food products from animals, and two reported on both. The expert judgment elicitation procedure and its outcomes are described in these volumes. This volume contains seven appendices. Appendix A presents a brief discussion of the MAACS and COSYMA model codes. Appendix B is the structure document and elicitation questionnaire for the expert panel on soils and plants. Appendix C presents the rationales and responses of each of the members of the soils and plants expert panel. Appendix D is the structure document and elicitation questionnaire for the expert panel on animal transfer. The rationales and responses of each of the experts on animal transfer are given in Appendix E. Brief biographies of the food chain expert panel members are provided in Appendix F. Aggregated results of expert responses are presented in graph format in Appendix G

  7. Final safety evaluation report related to the certification of the System 80{sup +} design (Docket No. 52-002). Volume 2, Chapters 15--22 and appendices

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the system 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR {section} 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of ABB-CE`s System 80 design from which it evolved. Unique features of the System 80+ design include: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE`s application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 2, contains Chapters 15 through 22 and Appendices A through E.

  8. Interim report on task 1.2: near equilibrium processing requirements part 2 of 2 appendices to Lawrence Livermore National Laboratory for contract b345772

    International Nuclear Information System (INIS)

    Stewart, M W A; Vance, E R; Day, R A; Brownscombe, A

    1999-01-01

    Ten appendices are included: Appendix A - Copies of fabrication work instructions, consisting mostly of micrographs; Appendix B - X-ray diffraction results of the samples from task 2, which contains a list of the raw data files; Appendix C - Scanning electron micrographs and energy dispersive x-ray spectrometry results for samples of composition B1-2 - Th/U-doped baseline ceramic; Appendix D - Scanning electron micrographs and energy dispersive x-ray spectrometry results for samples of composition B1-4 - TH/U-doped baseline + impurities ceramic; Appendix E - Scanning electron micrographs and energy dispersive x-ray spectrometry results for samples of composition B1-10 - Th/U-doped zirconolite-rich ceramic; Appendix F - Scanning electron micrographs and energy dispersive x-ray spectrometry results for samples of composition B1-12 - Th/U-doped brannerite-rich ceramic; Appendix G - Scanning electron micrographs and energy dispersive x-ray spectrometry results for samples of composition B1-14 - Th/U-doped, nominally ∼ 10 % perovskite ceramic; Appendix H - Scanning eleCtron micrographs and energy dispersive x-ray spectrometry results for samples of composition B1-16 - Th/U-doped, nominally ∼ 10 % phosphate ceramic; Appendix I - Scanning electron micrographs and energy dispersive x-ray spectrometry results for the plutonium-doped samples; and Appendix J - Scanning electron micrographs and energy dispersive x-ray spectrometry results of samples sintered in 3.7 % hydrogen in argon

  9. Final safety evaluation report related to the certification of the System 80+ design (Docket No. 52-002). Volume 2, Chapters 15--22 and appendices

    International Nuclear Information System (INIS)

    1994-08-01

    This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the system 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR section 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of ABB-CE's System 80 design from which it evolved. Unique features of the System 80+ design include: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE's application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 2, contains Chapters 15 through 22 and Appendices A through E

  10. City of Richland 300 Area industrial wastewater permit application

    International Nuclear Information System (INIS)

    1995-05-01

    Battelle-Pacific Northwest Labs and Westinghouse Hanford Co. are responsible for operating most of the facilities within the 300 Area; other contractors are also involved. The document gives briefly water/wastewater data: water sources, water usage, water discharge/loss, NPDES permit status, plant sewer outlets size and flow, etc. The document also includes the following attachments: 300 Area building list, Oct. 1993-Oct. 1994 300 Area water balance, waste shipments for CY 1994, complete chemical listing, sanitary sewer sampling results (12/19/94, 1/18/95, 1/15/95), and priority pollutant listings

  11. USDA Forest Service, Rocky Mountain Region PSD Permit Completeness Determination

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  13. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  14. CT and MR imaging findings of appendiceal and hepatic mucormycosis in a patient with acute T-lymphoblastic leukemia

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seo Youn; Lee, Min Hee; Lee, Hae Kyung; Yi, Boem Ha; Chin, Su Sie; Park, Seong Kyu; Chung, Jun Chul [Soonchunhyang University Bucheon Hospital, Bucheon (Korea, Republic of)

    2015-11-15

    Fungal infections occur in severely immunocompromised patients having profound and prolonged neutropenia. Here, we report a case of a 41-year-old female who, at the conclusion of induction chemotherapy for acute T-lymphoblastic leukemia, developed angioinvasive mucormycosis involving the appendix and liver, which presented as abdominal pain. This case is the first to provide detailed computed tomography and magnetic resonance imaging findings of angioinvasive appendiceal and hepatic mucormycosis. The implications of these findings as well as the diagnosis and management of mucormycosis, is further discussed.

  15. CT and MR imaging findings of appendiceal and hepatic mucormycosis in a patient with acute T-lymphoblastic leukemia

    International Nuclear Information System (INIS)

    Choi, Seo Youn; Lee, Min Hee; Lee, Hae Kyung; Yi, Boem Ha; Chin, Su Sie; Park, Seong Kyu; Chung, Jun Chul

    2015-01-01

    Fungal infections occur in severely immunocompromised patients having profound and prolonged neutropenia. Here, we report a case of a 41-year-old female who, at the conclusion of induction chemotherapy for acute T-lymphoblastic leukemia, developed angioinvasive mucormycosis involving the appendix and liver, which presented as abdominal pain. This case is the first to provide detailed computed tomography and magnetic resonance imaging findings of angioinvasive appendiceal and hepatic mucormycosis. The implications of these findings as well as the diagnosis and management of mucormycosis, is further discussed

  16. Empirical Model Development for Predicting Shock Response on Composite Materials Subjected to Pyroshock Loading. Volume 2, Part 1; Appendices

    Science.gov (United States)

    Gentz, Steven J.; Ordway, David O.; Parsons, David S.; Garrison, Craig M.; Rodgers, C. Steven; Collins, Brian W.

    2015-01-01

    The NASA Engineering and Safety Center (NESC) received a request to develop an analysis model based on both frequency response and wave propagation analyses for predicting shock response spectrum (SRS) on composite materials subjected to pyroshock loading. The model would account for near-field environment (approximately 9 inches from the source) dominated by direct wave propagation, mid-field environment (approximately 2 feet from the source) characterized by wave propagation and structural resonances, and far-field environment dominated by lower frequency bending waves in the structure. This document contains appendices to the Volume I report.

  17. Solar central receiver hybrid power system, Phase I. Volume 3. Appendices. Final technical report, October 1978-August 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    A design study for a central receiver/fossil fuel hybrid power system using molten salts for heat transfer and heat storage is presented. This volume contains the appendices: (A) parametric salt piping data; (B) sample heat exchanger calculations; (C) salt chemistry and salt/materials compatibility evaluation; (D) heliostat field coordinates; (E) data lists; (F) STEAEC program input data; (G) hybrid receiver design drawings; (H) hybrid receiver absorber tube thermal math model; (I) piping stress analysis; (J) 100-MWe 18-hour storage solar central receiver hybrid power system capital cost worksheets; and (K) 500-MWe 18-hour solar central receiver hybrid power system cost breakdown. (WHK)

  18. The potential for using disused coastal mineshafts to exploit wave energy : Vol. 1: Main report; Vol. 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Scholes, H.; Millar, D.L.; Eyre, J.M.; Dibley, R.; Davey, G.; Haywood, M.

    2004-07-01

    This report summarises the findings of a project investigating the potential use of abandoned mine shafts in Cornwall as oscillating water column wave power generation devices, and assesses the Waveshaft concept in phase 1 prior to further examination of selected sites in phase 2. Details are given of the criteria for the mine shafts, identification of candidate shafts, remediation/enhancement requirements, and wave climate along with power conversion issues, overall estimated waveshaft resource in Cornwall, environmental impacts and legal protection, and an economic appraisal. Inspection and safety protocols, mine location maps, and wave power data are presented in appendices.

  19. Territorial Climate-Energy Plan - Le Mans region. Complete file + synthesis + Action sheets + Actor file + Appendices + Territory file

    International Nuclear Information System (INIS)

    Boulard, Jean-Claude

    2014-07-01

    A first document presents the meaning, objectives and implementation of the Territorial Climate Energy Plan (PCET) for Le Mans region, and then its five main steps: definition, diagnosis, actors, roadmap, assessment. A synthetic version is provided. Twenty action sheets are proposed, first in synthetic and general way, and then in terms of projects. These actions deal with transport and mobility, with building and development, with agriculture, forest and nature, with consumption and wastes, and with the mobilisation of actors. A document proposes sheets which describe good practices performed by Le Mans region 'syndicat mixte', by the city of Le Mans and its metropolitan body. Appendices contain some organisational information

  20. Interim performance criteria for photovoltaic energy systems. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  1. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  2. Tradable permit allocations and sequential choice

    Energy Technology Data Exchange (ETDEWEB)

    MacKenzie, Ian A. [Centre for Economic Research, ETH Zuerich, Zurichbergstrasse 18, 8092 Zuerich (Switzerland)

    2011-01-15

    This paper investigates initial allocation choices in an international tradable pollution permit market. For two sovereign governments, we compare allocation choices that are either simultaneously or sequentially announced. We show sequential allocation announcements result in higher (lower) aggregate emissions when announcements are strategic substitutes (complements). Whether allocation announcements are strategic substitutes or complements depends on the relationship between the follower's damage function and governments' abatement costs. When the marginal damage function is relatively steep (flat), allocation announcements are strategic substitutes (complements). For quadratic abatement costs and damages, sequential announcements provide a higher level of aggregate emissions. (author)

  3. AMS at the ANU including biomedical applications

    Energy Technology Data Exchange (ETDEWEB)

    Fifield, L K; Allan, G L; Cresswell, R G; Ophel, T R [Australian National Univ., Canberra, ACT (Australia); King, S J; Day, J P [Manchester Univ. (United Kingdom). Dept. of Chemistry

    1994-12-31

    An extensive accelerator mass spectrometry program has been conducted on the 14UD accelerator at the Australian National University since 1986. In the two years since the previous conference, the research program has expanded significantly to include biomedical applications of {sup 26}Al and studies of landform evolution using isotopes produced in situ in surface rocks by cosmic ray bombardment. The system is now used for the measurement of {sup 10}Be, {sup 14}C, {sup 26}Al, {sup 36}Cl, {sup 59}Ni and {sup 129}I, and research is being undertaken in hydrology, environmental geochemistry, archaeology and biomedicine. On the technical side, a new test system has permitted the successful off-line development of a high-intensity ion source. A new injection line to the 14UD has been established and the new source is now in position and providing beams to the accelerator. 4 refs.

  4. AMS at the ANU including biomedical applications

    Energy Technology Data Exchange (ETDEWEB)

    Fifield, L.K.; Allan, G.L.; Cresswell, R.G.; Ophel, T.R. [Australian National Univ., Canberra, ACT (Australia); King, S.J.; Day, J.P. [Manchester Univ. (United Kingdom). Dept. of Chemistry

    1993-12-31

    An extensive accelerator mass spectrometry program has been conducted on the 14UD accelerator at the Australian National University since 1986. In the two years since the previous conference, the research program has expanded significantly to include biomedical applications of {sup 26}Al and studies of landform evolution using isotopes produced in situ in surface rocks by cosmic ray bombardment. The system is now used for the measurement of {sup 10}Be, {sup 14}C, {sup 26}Al, {sup 36}Cl, {sup 59}Ni and {sup 129}I, and research is being undertaken in hydrology, environmental geochemistry, archaeology and biomedicine. On the technical side, a new test system has permitted the successful off-line development of a high-intensity ion source. A new injection line to the 14UD has been established and the new source is now in position and providing beams to the accelerator. 4 refs.

  5. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2005 and... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871...

  6. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  7. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  8. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... purpose of enhancing the species' survival. Permit No. TE-99477A Applicant: Benjamin S. Wallace, Fairfield...-99473A Applicant: Joseph D. Henry, San Diego, California The applicant requests a permit to take (capture...

  9. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...: EA Engineering, Science, and Technology, Lewisville, Texas. Applicant requests a new permit for... atricapilla) within Texas. Permit TE-37047A Applicant: Sea World Parks and Entertainment, San Antonio, Texas...

  10. 76 FR 35235 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-06-16

    ... chub (Gila intermedia), Gila topminnow (Poeciliopsis occidentalis occidentalis), humpback chub (Gila... intermedia) within Arizona. Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant...), and Gila chub (Gila intermedia) within Arizona. Permit TE-118414 Applicant: Cherokee Nation, Tahlequah...

  11. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  12. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  13. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  14. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

  15. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  16. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  17. Are LMFBR permits unconstitutional. [German Feferal Republic

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, H; Ziegler, E

    1977-12-01

    The August 18, 1977 decision by the Muenster Higher Administrative Court to have the Federal Constitutional Court investigate the constitutionality of permits granted for fast breeder power plants has aroused much attention, both in the FRG and in other countries. This is the first time that the German Atomic Energy Act is being questioned with respect to the separation of powers between legislative and executive authorities and also with respect to the principle of a constitutional state. As a result of their analysis of the first information available about the court decision the authors have some doubts as to whether the views held by the court about the consequences of the development of fast breeder reactors and of the permit granted for the SNR 300 demonstration nuclear power station are essentially correct. In view of the wording of and the official comments on the incriminated Section 7 of the Atomic Energy Act and the large number of subsequent leading decisions by the Federal Diet about fast breeder reactors also the concern about the constitutionality of that reactor line appears to be unfounded.

  18. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  19. NASAwide electronic publishing system-prototype STI electronic document distribution: Stage-4 evaluation report. Part 2; Appendices

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  20. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...