WorldWideScience

Sample records for permit sc1-890-008-989 effective

  1. F-Area Hazardous Waste Management Facility Semiannual Corrective Action Report, First and Second Quarter 1998, Volume I and II

    International Nuclear Information System (INIS)

    Chase, J.

    1998-01-01

    This report addresses groundwater quality and monitoring data during first and second quarter 1998 for the F-Area Hazardous Waste management Facility (HWMF). The report fulfills the semiannual reporting requirements of Module III, Section D, of the 1995 Resource Conservation and Recovery Act (RCRA) Renewal Permit (South Carolina Hazardous and Mixed Waste Permit SC1-890-008-989), effective October 5, 1995 (hereafter referred to as the RCRA permit), and Section C of the Underground Injection Control Permit Application hereafter referred to as the Section C of the Underground Injection Control Permit Application (hereafter referred to as the UIC permit). The HWMF is described in the Introduction to Module III, Section C, of the RCRA permit

  2. 1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)

    International Nuclear Information System (INIS)

    Chase, J.

    2000-01-01

    This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events

  3. M-Area hazardous waste management facility groundwater monitoring report -- first quarter 1994. Volume 1

    International Nuclear Information System (INIS)

    Evans, C.S.; Washburn, F.; Jordan, J.; Van Pelt, R.

    1994-05-01

    This report describes the groundwater monitoring and corrective action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during first quarter 1994 as required by South Carolina Hazardous Waste Permit SC1-890-008-989 and section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. During first quarter 1994, 42 point-of-compliance (POC) wells at the M-Area HWMF were sampled for drinking water parameters

  4. F-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993

    International Nuclear Information System (INIS)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the second half of 1993, notably aluminum, iodine-129, and zinc. The elevated constituents are found primarily in Aquifer Zone 2B 2 and Aquifer Zone 2B 1 wells. However, several Aquifer Unit 2A wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Water-level maps indicate that the groundwater flow rates and directions at the FASB have remained relatively constant since the basins ceased to be active in 1988

  5. H-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SC1-890-008-989. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning first quarter 1993, the HASB`s Groundwater Protection Standard (GWPS), established in Appendix 3D-A of the cited permit, became the standard for comparison. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constitutents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, technetium-99, and zinc) during the second half of 1993. Elevated constituents were found primarily in Aquifer Zone 2B{sub 2} and in the upper portion of Aquifer Zone 2B{sub 1}. However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone 2B{sub 1} and Aquifer Unit 2A. Isoconcentration/isoactivity maps include in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during the second half of 1993. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.

  6. H-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993

    International Nuclear Information System (INIS)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SC1-890-008-989. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning first quarter 1993, the HASB's Groundwater Protection Standard (GWPS), established in Appendix 3D-A of the cited permit, became the standard for comparison. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constitutents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, technetium-99, and zinc) during the second half of 1993. Elevated constituents were found primarily in Aquifer Zone 2B 2 and in the upper portion of Aquifer Zone 2B 1 . However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone 2B 1 and Aquifer Unit 2A. Isoconcentration/isoactivity maps include in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during the second half of 1993. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988

  7. Effect of zero discharge permits on oil and gas operations

    International Nuclear Information System (INIS)

    Higdon, G.D.

    1994-01-01

    This paper examines one of the more prominent effects of the Clean Water Act (CWA) upon oil and gas operations. To that end, the paper begins with a general discussion of the regulatory background and permitting framework which serves as the foundation for water pollution control. From this discussion, the paper will then move into a discussion of particular permit provisions which govern the discharge of wastes generated from oil and gas operations. Upon discussing these provisions, the paper will then discuss potential enforcement options available to the Environmental Protection Agency (EPA) to address violations of the regulations and permits it has issued to implement the CWA. In that regard, the paper will also discuss some recent enforcement theories advocated by the EPA which may have significant impacts upon oil and gas operators and the way in which they conduct their operations. In light of some of these recent enforcement activities, the paper will close with a discussion of the implications of the theories of liability espoused by EPA and steps which oil and gas operators may taking in response to the positions assumed by EPA

  8. 40 CFR 96.24 - Effective date of initial NOX Budget permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Effective date of initial NOX Budget... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Permits § 96.24 Effective date of initial NOX Budget permit. The initial NOX Budget permit...

  9. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  10. Tradeable CO2 emission permits for cost-effective control of global warming

    International Nuclear Information System (INIS)

    Kosobud, R.F.; South, D.W.; Daly, T.A.; Quinn, K.G.

    1991-01-01

    Many current global warming mitigation policy proposals call for large, near-term reductions in CO 2 emissions, thereby entailing high initial carbon emission tax rates or permit prices. This paper claims that these high initial tax rates or permit prices are not cost-effective in achieving the desired degree of climate change control. A cost-effective permit system is proposed and described that, under certain assumptions, would allow markets to optimally lead permit prices along a gradually increasing trajectory over tie. This price path presents the Hotelling result and would ease the abrupt, inefficient, and costly adjustments imposed on the fossil fuel and other industries in current proposals. This finding is demonstrated using the Argonne Model, a linear programming energy- environmental-economic model that allows for intertemporal optimization of consumer energy well-being. 12 refs., 3 figs., 1 tab

  11. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  12. The Effect of Emission Permits and Pigouvian Taxes on Market Structure

    Energy Technology Data Exchange (ETDEWEB)

    Bunuel, M.

    2001-07-01

    Differently from Pigouvian taxes and direct regulation, tradable emission permits can decrease competition in a polluting industry under certain circumstances. Assume a potential entrant who can buy every permit. When permits are given free to current polluters, monopolization occurs if not every polluter foresees it. If foreseen, polluters want to free ride on the entrant's market power, but entry can still occur, although not with certainty. Considering a symmetric, mixed-strategy equilibrium with unconditional bids, the probability of entry decreases as the number of polluters increase. When permits are sold initially, monopolization occurs without more requirements than polluters being financially constrained. (Author)

  13. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  14. Uncertainty from the choice of microphysics scheme in convection-permitting models significantly exceeds aerosol effects

    Directory of Open Access Journals (Sweden)

    B. White

    2017-10-01

    Full Text Available This study investigates the hydrometeor development and response to cloud droplet number concentration (CDNC perturbations in convection-permitting model configurations. We present results from a real-data simulation of deep convection in the Congo basin, an idealised supercell case, and a warm-rain large-eddy simulation (LES. In each case we compare two frequently used double-moment bulk microphysics schemes and investigate the response to CDNC perturbations. We find that the variability among the two schemes, including the response to aerosol, differs widely between these cases. In all cases, differences in the simulated cloud morphology and precipitation are found to be significantly greater between the microphysics schemes than due to CDNC perturbations within each scheme. Further, we show that the response of the hydrometeors to CDNC perturbations differs strongly not only between microphysics schemes, but the inter-scheme variability also differs between cases of convection. Sensitivity tests show that the representation of autoconversion is the dominant factor that drives differences in rain production between the microphysics schemes in the idealised precipitating shallow cumulus case and in a subregion of the Congo basin simulations dominated by liquid-phase processes. In this region, rain mass is also shown to be relatively insensitive to the radiative effects of an overlying layer of ice-phase cloud. The conversion of cloud ice to snow is the process responsible for differences in cold cloud bias between the schemes in the Congo. In the idealised supercell case, thermodynamic impacts on the storm system using different microphysics parameterisations can equal those due to aerosol effects. These results highlight the large uncertainty in cloud and precipitation responses to aerosol in convection-permitting simulations and have important implications not only for process studies of aerosol–convection interaction, but also for

  15. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  16. The clean development mechanism versus international permit trading: The effect on technological change

    International Nuclear Information System (INIS)

    Hagem, Cathrine

    2009-01-01

    The clean development mechanism of the Kyoto Protocol may induce technological change in developing countries. As an alternative to the clean development mechanism regime, developing countries may accept a (generous) cap on their own emissions, allow domestic producers to invest in new efficient technologies, and sell the excess emission permits on the international permit market. The purpose of this article is to show how the gains from investment, and hence the incentive to invest in new technology in developing countries, differ between the two alternative regimes. We show that the difference in the gains from investment depends on whether the producers in developing countries face competitive or noncompetitive output markets, whether the investment affects fixed or variable production costs, and whether producers can reduce emissions through means other than investing in new technology. (author)

  17. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  18. Swedish Industry and Kyoto. An Assessment of the Effects of the European CO2 Emission Permit Trading System

    International Nuclear Information System (INIS)

    Braennlund, Runar; Lundgren, Tommy

    2005-01-01

    We assess the effects on Swedish industry input and output demands of different climate policy scenarios connected to energy policy induced by the Kyoto protocol. A unique data set containing firm level data on outputs and inputs during the years 1991-2001 is used to estimate a factor demand model, which is then simulated for different policy scenarios. Sector specific estimation suggests that the proposed quadratic profit function specification exhibit properties and robustness that are consistent with economic theory; that is, all own-price elasticities are negative and all output elasticities are positive. Furthermore, the elasticities show that the input demands are, in most cases, relatively inelastic. Simulation of the model for 6 different policy scenarios reveal that the effects on Swedish base industry of a EU level permit trade system is dependent on (i) removal or no removal of current CO 2 tax, (ii) the established price of permits, and (iii) what will happen to the electricity price. Our analysis show that changes in electricity price may be more important than the price of permits for some sectors

  19. Silica-air photonic crystal fiber design that permits waveguiding by a true photonic bandgap effect

    DEFF Research Database (Denmark)

    Barkou, Stig Eigil; Broeng, Jes; Bjarklev, Anders Overgaard

    1999-01-01

    A theoretical investigation of a novel type of optical fiber is presented. The operation of the fiber relies entirely on wave guidance through the photonic bandgap effect and not on total internal reflection, thereby distinguishing that fiber from all other known fibers, including recently studied...... photonic crystal fibers. The novel fiber has a central low-index core region and a cladding consisting of a silica background material with air holes situated within a honeycomb lattice structure. We show the existence of photonic bandgaps for the silica–air cladding structure and demonstrate how light can...... be guided at the central low-index core region for a well-defined frequency that falls inside the photonic bandgap region of the cladding structure....

  20. Targeted genotyping-by-sequencing permits cost-effective identification and discrimination of pasture grass species and cultivars.

    Science.gov (United States)

    Pembleton, Luke W; Drayton, Michelle C; Bain, Melissa; Baillie, Rebecca C; Inch, Courtney; Spangenberg, German C; Wang, Junping; Forster, John W; Cogan, Noel O I

    2016-05-01

    A targeted amplicon-based genotyping-by-sequencing approach has permitted cost-effective and accurate discrimination between ryegrass species (perennial, Italian and inter-species hybrid), and identification of cultivars based on bulked samples. Perennial ryegrass and Italian ryegrass are the most important temperate forage species for global agriculture, and are represented in the commercial pasture seed market by numerous cultivars each composed of multiple highly heterozygous individuals. Previous studies have identified difficulties in the use of morphophysiological criteria to discriminate between these two closely related taxa. Recently, a highly multiplexed single nucleotide polymorphism (SNP)-based genotyping assay has been developed that permits accurate differentiation between both species and cultivars of ryegrasses at the genetic level. This assay has since been further developed into an amplicon-based genotyping-by-sequencing (GBS) approach implemented on a second-generation sequencing platform, allowing accelerated throughput and ca. sixfold reduction in cost. Using the GBS approach, 63 cultivars of perennial, Italian and interspecific hybrid ryegrasses, as well as intergeneric Festulolium hybrids, were genotyped. The genetic relationships between cultivars were interpreted in terms of known breeding histories and indistinct species boundaries within the Lolium genus, as well as suitability of current cultivar registration methodologies. An example of applicability to quality assurance and control (QA/QC) of seed purity is also described. Rapid, low-cost genotypic assays provide new opportunities for breeders to more fully explore genetic diversity within breeding programs, allowing the combination of novel unique genetic backgrounds. Such tools also offer the potential to more accurately define cultivar identities, allowing protection of varieties in the commercial market and supporting processes of cultivar accreditation and quality assurance.

  1. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  2. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  3. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  4. Assessing the surroundings for effects of ionising radiation on the granting of permits, DOVIS A. Emissions to air and water

    CERN Document Server

    Blaauboer, R O

    2002-01-01

    In the Netherlands, as in most other countries, one generally needs a permit to produce (including the manufacture, processing, control and storage), to apply or to dispose of radioactive materials, or to use equipment that produces ionising radiation. This permit must be in accordance with the Nuclear Energy Act. Limits that are set for radioactive material can be found in the Decree on radiation protection ('Besluit stralings-bescherming') which has been in force since March 1, 2002. Along with the application for a permit, calculation results have to be submitted on the radiation dose that members of the public receive as a consequence of (possible) emissions of radioactive material (into the atmosphere or surface water) or as a consequence of external irradiation. Fairly rough estimates, based on simple rules, will often be satisfactory. These rules can be found in an annex of a Ministerial Order on the assessment of consequences of ionising radiation (mr-AGIS). However, in some cases this will not be ade...

  5. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  6. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  7. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  8. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  9. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  10. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  11. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  12. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  13. The Effectiveness of Building Permit Regulation for Green Open Space at Housing Estates: Case Study of Kendal Regency, Central Java, Indonesia

    Science.gov (United States)

    Yulianti, Wiwik; Hadi, Sudharto P.

    2018-02-01

    Increasing demand for settlements steamed by population growth declines the quality of the environment specifically at urban area. The existing spatial planning could not able to prevent the change of land use for settlement and other infrastructures. The Act no. 26 of 2007 on spatial planning stipulates that green open space must reach 30% of the total area, consisting of 20% public open space and 10% private open space. The existing condition of urban area at Kendal Regency reach 245,6 million m2 with 88.145,5 m2 green open space or 0,036% out of total area. An effort to increase green open space in urban areas taken by the Government of Kendal Regency is by promulgating a local regulation stipulating that each housing developer request a building permit is obliged to provide a green open space at least 10 percent of the total housing area. This paper reviews the effectiveness of building permit regulation, the problems encountered and the concept proposed to make the local regulation work. The area of sample taken is three urban districts out of five urban districts, the resource persons chosen are those from relevant offices (Dinas) involved at the implementation of the local regulation. The data collection techniques employed are the Analytical Hierarchy Process (AHP), Geographic Information System (GIS) technology, social observation and informal interview. The data gathered will be analyzed quantitatively and qualitatively.

  14. The Effectiveness of Building Permit Regulation for Green Open Space at Housing Estates: Case Study of Kendal Regency, Central Java, Indonesia

    Directory of Open Access Journals (Sweden)

    Yulianti Wiwik

    2018-01-01

    Full Text Available Increasing demand for settlements steamed by population growth declines the quality of the environment specifically at urban area. The existing spatial planning could not able to prevent the change of land use for settlement and other infrastructures. The Act no. 26 of 2007 on spatial planning stipulates that green open space must reach 30% of the total area, consisting of 20% public open space and 10% private open space. The existing condition of urban area at Kendal Regency reach 245,6 million m2 with 88.145,5 m2 green open space or 0,036% out of total area. An effort to increase green open space in urban areas taken by the Government of Kendal Regency is by promulgating a local regulation stipulating that each housing developer request a building permit is obliged to provide a green open space at least 10 percent of the total housing area. This paper reviews the effectiveness of building permit regulation, the problems encountered and the concept proposed to make the local regulation work. The area of sample taken is three urban districts out of five urban districts, the resource persons chosen are those from relevant offices (Dinas involved at the implementation of the local regulation. The data collection techniques employed are the Analytical Hierarchy Process (AHP, Geographic Information System (GIS technology, social observation and informal interview. The data gathered will be analyzed quantitatively and qualitatively.

  15. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  16. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  17. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  18. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  19. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  20. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  1. Permitted water pollution discharges and population cancer and non-cancer mortality: toxicity weights and upstream discharge effects in US rural-urban areas.

    Science.gov (United States)

    Hendryx, Michael; Conley, Jamison; Fedorko, Evan; Luo, Juhua; Armistead, Matthew

    2012-04-02

    The study conducts statistical and spatial analyses to investigate amounts and types of permitted surface water pollution discharges in relation to population mortality rates for cancer and non-cancer causes nationwide and by urban-rural setting. Data from the Environmental Protection Agency's (EPA) Discharge Monitoring Report (DMR) were used to measure the location, type, and quantity of a selected set of 38 discharge chemicals for 10,395 facilities across the contiguous US. Exposures were refined by weighting amounts of chemical discharges by their estimated toxicity to human health, and by estimating the discharges that occur not only in a local county, but area-weighted discharges occurring upstream in the same watershed. Centers for Disease Control and Prevention (CDC) mortality files were used to measure age-adjusted population mortality rates for cancer, kidney disease, and total non-cancer causes. Analysis included multiple linear regressions to adjust for population health risk covariates. Spatial analyses were conducted by applying geographically weighted regression to examine the geographic relationships between releases and mortality. Greater non-carcinogenic chemical discharge quantities were associated with significantly higher non-cancer mortality rates, regardless of toxicity weighting or upstream discharge weighting. Cancer mortality was higher in association with carcinogenic discharges only after applying toxicity weights. Kidney disease mortality was related to higher non-carcinogenic discharges only when both applying toxicity weights and including upstream discharges. Effects for kidney mortality and total non-cancer mortality were stronger in rural areas than urban areas. Spatial results show correlations between non-carcinogenic discharges and cancer mortality for much of the contiguous United States, suggesting that chemicals not currently recognized as carcinogens may contribute to cancer mortality risk. The geographically weighted

  2. Permitted water pollution discharges and population cancer and non-cancer mortality: toxicity weights and upstream discharge effects in US rural-urban areas

    Directory of Open Access Journals (Sweden)

    Hendryx Michael

    2012-04-01

    Full Text Available Abstract Background The study conducts statistical and spatial analyses to investigate amounts and types of permitted surface water pollution discharges in relation to population mortality rates for cancer and non-cancer causes nationwide and by urban-rural setting. Data from the Environmental Protection Agency's (EPA Discharge Monitoring Report (DMR were used to measure the location, type, and quantity of a selected set of 38 discharge chemicals for 10,395 facilities across the contiguous US. Exposures were refined by weighting amounts of chemical discharges by their estimated toxicity to human health, and by estimating the discharges that occur not only in a local county, but area-weighted discharges occurring upstream in the same watershed. Centers for Disease Control and Prevention (CDC mortality files were used to measure age-adjusted population mortality rates for cancer, kidney disease, and total non-cancer causes. Analysis included multiple linear regressions to adjust for population health risk covariates. Spatial analyses were conducted by applying geographically weighted regression to examine the geographic relationships between releases and mortality. Results Greater non-carcinogenic chemical discharge quantities were associated with significantly higher non-cancer mortality rates, regardless of toxicity weighting or upstream discharge weighting. Cancer mortality was higher in association with carcinogenic discharges only after applying toxicity weights. Kidney disease mortality was related to higher non-carcinogenic discharges only when both applying toxicity weights and including upstream discharges. Effects for kidney mortality and total non-cancer mortality were stronger in rural areas than urban areas. Spatial results show correlations between non-carcinogenic discharges and cancer mortality for much of the contiguous United States, suggesting that chemicals not currently recognized as carcinogens may contribute to cancer

  3. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  4. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  5. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  6. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  7. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  8. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  9. Marginal cost curves for water footprint reduction in irrigated agriculture: guiding a cost-effective reduction of crop water consumption to a permit or benchmark level

    Directory of Open Access Journals (Sweden)

    A. D. Chukalla

    2017-07-01

    Full Text Available Reducing the water footprint (WF of the process of growing irrigated crops is an indispensable element in water management, particularly in water-scarce areas. To achieve this, information on marginal cost curves (MCCs that rank management packages according to their cost-effectiveness to reduce the WF need to support the decision making. MCCs enable the estimation of the cost associated with a certain WF reduction target, e.g. towards a given WF permit (expressed in m3  ha−1 per season or to a certain WF benchmark (expressed in m3  t−1 of crop. This paper aims to develop MCCs for WF reduction for a range of selected cases. AquaCrop, a soil-water-balance and crop-growth model, is used to estimate the effect of different management packages on evapotranspiration and crop yield and thus the WF of crop production. A management package is defined as a specific combination of management practices: irrigation technique (furrow, sprinkler, drip or subsurface drip; irrigation strategy (full or deficit irrigation; and mulching practice (no, organic or synthetic mulching. The annual average cost for each management package is estimated as the annualized capital cost plus the annual costs of maintenance and operations (i.e. costs of water, energy and labour. Different cases are considered, including three crops (maize, tomato and potato; four types of environment (humid in UK, sub-humid in Italy, semi-arid in Spain and arid in Israel; three hydrologic years (wet, normal and dry years and three soil types (loam, silty clay loam and sandy loam. For each crop, alternative WF reduction pathways were developed, after which the most cost-effective pathway was selected to develop the MCC for WF reduction. When aiming at WF reduction one can best improve the irrigation strategy first, next the mulching practice and finally the irrigation technique. Moving from a full to deficit irrigation strategy is found to be a no-regret measure: it reduces the WF

  10. Marginal cost curves for water footprint reduction in irrigated agriculture: guiding a cost-effective reduction of crop water consumption to a permit or benchmark level

    Science.gov (United States)

    Chukalla, Abebe D.; Krol, Maarten S.; Hoekstra, Arjen Y.

    2017-07-01

    Reducing the water footprint (WF) of the process of growing irrigated crops is an indispensable element in water management, particularly in water-scarce areas. To achieve this, information on marginal cost curves (MCCs) that rank management packages according to their cost-effectiveness to reduce the WF need to support the decision making. MCCs enable the estimation of the cost associated with a certain WF reduction target, e.g. towards a given WF permit (expressed in m3  ha-1 per season) or to a certain WF benchmark (expressed in m3  t-1 of crop). This paper aims to develop MCCs for WF reduction for a range of selected cases. AquaCrop, a soil-water-balance and crop-growth model, is used to estimate the effect of different management packages on evapotranspiration and crop yield and thus the WF of crop production. A management package is defined as a specific combination of management practices: irrigation technique (furrow, sprinkler, drip or subsurface drip); irrigation strategy (full or deficit irrigation); and mulching practice (no, organic or synthetic mulching). The annual average cost for each management package is estimated as the annualized capital cost plus the annual costs of maintenance and operations (i.e. costs of water, energy and labour). Different cases are considered, including three crops (maize, tomato and potato); four types of environment (humid in UK, sub-humid in Italy, semi-arid in Spain and arid in Israel); three hydrologic years (wet, normal and dry years) and three soil types (loam, silty clay loam and sandy loam). For each crop, alternative WF reduction pathways were developed, after which the most cost-effective pathway was selected to develop the MCC for WF reduction. When aiming at WF reduction one can best improve the irrigation strategy first, next the mulching practice and finally the irrigation technique. Moving from a full to deficit irrigation strategy is found to be a no-regret measure: it reduces the WF by reducing water

  11. Channel bed particle size distribution procedure used to evaluate watershed cumulative effects for range permit re-issuance on the Santa Fe National Forest

    Science.gov (United States)

    Bruce Sims; Jim Piatt; Lee Johnson; Carol Purchase; John Phillips

    1996-01-01

    Personnel on the Santa Fe National Forest used methodologies adapted from Bevenger and King (1995) to collect base line particle size data on streams within grazing allotments currently scheduled for permit reissuance. This information was used to determine the relative current health of the watersheds as well as being used in the development of potential alternatives...

  12. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  13. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  14. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  15. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  16. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  17. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  18. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  19. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  20. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  1. 21 CFR 1312.13 - Issuance of import permit.

    Science.gov (United States)

    2010-04-01

    ... drug listed in Schedule III, IV, or V if he finds: (1) That the substance is crude opium, poppy straw... shall render it void and of no effect. Permits are not transferable. Each copy of the permit shall have... the Act (21 U.S.C. 952(a)(1) or (a)(2)(A)), the importation of approved narcotic raw material (opium...

  2. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  3. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  4. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  5. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  6. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  7. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  8. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  9. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  10. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  11. Enforcing Transferable Permit Systems in the Presence of Market Power

    International Nuclear Information System (INIS)

    Chavez, C.A.; Stanlund, J.K.

    2003-01-01

    We derive an enforcement strategy for a transferable permit system in the presence of market power that achieves complete compliance in a cost-effective manner. We show that the presence of a firm with market influence makes designing an enforcement strategy more difficult than enforcing a perfectly competitive system. We also re-consider the suggestion that a firm with market influence should be allocated permits so that it chooses to not participate in the permit market. When enforcement and its costs are taken into account, that suggestion does not hold except in a very special case

  12. Auctioning emission permits in a leader-follower setting

    OpenAIRE

    Alvarez, Francisco; André, Francisco J.

    2015-01-01

    We analise emission permit auctions under leader-follower competition when the leader bids strategically and the follower acts as price-taker both at the auction and the secondary market. We obtain linear equilibrium bidding strategies for both firms and a unique equilibrium of the auction, which is optimal ex-post for the leader. Under specific distributional assumptions we conclude that the auction always awards less permits to the leader than the cost-effective amount. Our central result i...

  13. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  15. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  16. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  17. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  18. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  19. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  20. Marginal cost curves for water footprint reduction in irrigated agriculture : Guiding a cost-effective reduction of crop water consumption to a permit or benchmark level

    NARCIS (Netherlands)

    Chukalla, Abebe D.; Krol, Maarten S.; Hoekstra, Arjen Y.

    2017-01-01

    Reducing the water footprint (WF) of the process of growing irrigated crops is an indispensable element in water management, particularly in water-scarce areas. To achieve this, information on marginal cost curves (MCCs) that rank management packages according to their cost-effectiveness to reduce

  1. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  2. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  3. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  4. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  5. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  6. Requirements for permitting a mixed waste incinerator

    International Nuclear Information System (INIS)

    Trichon, M.; Feldman, J.; Serne, J.C.

    1990-01-01

    The consideration, design, selection and operation of any incinerator depends primarily on characteristic quality (ultimate and proximate analyses) and quantity to the waste to be incinerated. In the case of burning any combination of mixed hazardous, biomedical and radioactive low level waste, specific federal and generic state environmental regulatory requirements are outlined. Combustion chamber temperature and waste residence time requirements will provide the rest of the envelope for consideration. Performance requirements must be balanced between the effects of time and temperature on destruction of the organic waste and the vaporization and possible emission of the inorganic waste components (e.g., toxic metals, radioactive inorganics) as operating conditions and emission levels will be set in state and federal regulatory permits. To this end the complete characterization of the subject waste stream must be determined if an accurate assessment of incineration effectiveness and impact are to be performed

  7. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  8. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  9. The Quality Problems of Certified Product With "Production Permit":Social Effects and Solutions%"生产许可"认证产品质量问题衍生的社会影响与对策探讨

    Institute of Scientific and Technical Information of China (English)

    丁利强

    2017-01-01

    "生产许可"认证产品承载着百姓对政府公共权力的信任,倘若产品出现质量问题,将会衍生诸多的不良社会影响:削弱政府公信力,加剧社会焦虑感;挑战公民基本道德底线,冲击整个社会诚信体系;催生利己主义变相膨胀,扰乱社会公共秩序等,成为社会和谐发展的安全隐患.为此,应完善政府主导下的"多维联动"产品质量监管机制,以推动经营主体提升职业道德责任意识.%The certified product with "product permit" carries with people's trust on government's public power.If there are quality problems there would be may negative social effects,such as weakening the public trust,intensifying social anxiety,challenging people's basic moral line and breaking down the overall social honesty system,expanding egoism and disordering public order.This makes hidden trouble threatening society and harmonious development.It is suggested to promote the government-dominated "multi-dimension cooperation" to supervise product quality and to promote business people's professional ethics.

  10. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  11. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  12. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  13. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  14. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  15. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  16. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  17. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  18. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  19. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  20. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  1. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  2. The American experience of negotiable permits to combat air pollution

    International Nuclear Information System (INIS)

    Gros, Ch.

    2001-01-01

    Negotiable permits have been used in various fields, but the system in which they have seen greatest use is undoubtedly the American system of negotiable permits to fight acid rain. Since the 1970's, the United States have introduced elements of flexibility into their policy for fighting atmospheric pollution. These elements have included the family of negotiable permits. However, it was only in 1990 during the vote to amend the law on air cleanliness that a genuine market for the rights to emit SO 2 was set up (taking effect on january 1. 1995). This article analyses this context in order to understand why and how such an instrument has been introduced, and goes on to present the results. (author)

  3. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  4. 21 CFR 352.20 - Permitted combinations of active ingredients.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 352.20 Section 352.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... effective date was stayed until further notice. For the convenience of the user, the text is set forth as...

  5. 21 CFR 333.320 - Permitted combinations of active ingredients.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 333.320 Section 333.320 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... Note: At 75 FR 9776, Mar. 4, 2010, § 333.320 was revised, effective Mar. 4, 2011. For the convenience...

  6. 45 CFR 671.6 - Applications for permits.

    Science.gov (United States)

    2010-10-01

    ... such releases; arrangements for waste management, including, without limitation, plans for waste...) The desired effective date and duration of the permit; and (5) The following certification: “I certify... (including duration). The notice shall invite the submission by interested parties, the Environmental...

  7. A Note on Market Power in an Emission Permits Market with Banking

    International Nuclear Information System (INIS)

    Liski, M.; Montero, J.P.

    2005-01-01

    In this paper, we investigate the effect of market power on equilibrium path of an emission permits market in which firms can bank current permits for use in later periods. In particular, we study the market equilibrium for a large (potentially dominant) firm and competitive fringe with rational expectations. We characterize the equilibrium solution for different permits allocations and discuss the large firms stock-holding constraints needed for credible market manipulation

  8. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  9. 32 CFR 935.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ... shall be issued under other authority that is inconsistent with this part. The Commander may issue.... (b) To the extent it is not inconsistent with this part, any permit or registration issued pursuant...

  10. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  11. 50 CFR 660.707 - Permits.

    Science.gov (United States)

    2010-10-01

    ... or downloaded from the Southwest Region home page (http://swr.nmfs.noaa.gov/permits.htm) to apply for... the vessel is fishing for, taking, retaining, possessing, or landing HMS shoreward of the outer...

  12. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... the logistical and cost concerns regarding the ability of the railroad industry to comply with the... incorporating the applicable GRL Special Permits into the HMR (and FRA's subsequent approval notice) those...

  13. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  14. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  15. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  16. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  17. A comparison of taxes and tradable permits in national climate policy

    Energy Technology Data Exchange (ETDEWEB)

    Holtsmark, Bjart J.

    1999-11-01

    This article discusses domestic climate policy design in a country that has made a binding commitment to the Kyoto Protocol but at the same time want to limit the number of industry shutdowns that follows from the policy. It is furthermore considered how public budget constraints might affect climate policies. The similarities between an optionally designed taxation regime and a domestic tradable permit regime that is integrated into the international permit market are brought into focus. The similarities presuppose a greenhouse gas tax that fluctuates in accordance with the international permit price. It is argued that climate policy can generate double dividends but that the allocation of free permits reduces these dividends. It is concluded that some organisations promotion of systems tradable permits with distribution of permits free of charge as an alternative to carbon taxes must be understood from their effect on income distribution. 17 refs

  18. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  19. Market Power with Interdependent Demand. Sale of Emission Permits and Natural Gas from Russia

    International Nuclear Information System (INIS)

    Hagem, C.; Kallbekken, S.; Westskog, H.; Maestad, O.

    2006-01-01

    With implementation of the Kyoto Protocol, Russia will most likely be able to exert market power in the emission permit market. But, as Russia is also a big exporter of fossil fuels, the incentives to boost the permit price may be weak. However, a significant share of Russia's fossil fuel exports is natural gas. If a high permit price boosts the demand for natural gas through substitution from more polluting fuels and thus increase gas profits, this may increase the incentives to exert monopoly power in the permit market. Moreover, a large fossil fuel exporter may use its market position to influence the effective demand for permits. Hence, the relationship between permit income and fossil fuels exports runs in both directions. In this article, we explore the interdependence between the revenues from permit and fossil fuel exports both theoretically and numerically. A computable general equilibrium model suggests the fact that Russia as a big gas exporter has small effect on the incentives to exert monopoly power in the permit market. Moreover, Russia's monopoly power in the permit market has a small, but non-negligible impact on the optimal level of Russian gas exports. (author)

  20. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  1. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  2. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  3. Setting the global thermostat with an exhaustible tradeable permit system

    International Nuclear Information System (INIS)

    Kosobud, R.G.; Quinn, K.G.; Illinois Univ., Chicago, IL; South, D.W.; Daly, T.A.

    1993-01-01

    The global warming policy debate has centered largely on near-term objectives such as freezing 1990 CO 2 emissions without regard to long-run implications. A policy of freezing CO 2 emissions is shown to slow but not halt global warming, while requiring expensive near-term adjustments. If the long-run temperature change outcome of the freeze policy is set as the goal of a more graduated control policy, one which allows the market to determine annual emissions, a more cost-effective solution is obtained that reduces the negative adjustment effects on the energy and other affected industries. The most cost-effective emissions time path of a graduated control policy could be achieved by an evaporative marketable CO 2 emissions permit system. This paper provides a preliminary examination of an evaporative permit system used to achieve long-run stabilization of greenhouse-induced temperature change

  4. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  5. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  6. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  7. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  8. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  9. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  10. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  11. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  12. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  13. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  14. Asymmetric learning by doing and dynamically efficient policy: implications for domestic and international emissions permit trading of allocating permits usefully

    International Nuclear Information System (INIS)

    Read, Peter

    2000-01-01

    Learning by doing leads to cost reductions as suppliers move down the 'experience curve'. This results in a beneficial supply side inter-temporal externality that, for dynamic efficiency, requires a higher incentive for abatement innovations than the penalty on emissions. This effect can be achieved by a dedicated emissions tax or by a proportionate abatement obligation or by allocating permits usefully. The latter arrangement is compatible with the effective cap on emissions that is secured by an emissions trading scheme. Each of the three possibilities results in a reduced loss of international competitivity in policy-committed regions, in less 'leakage, and in more technology transfer. Implications for trading in emissions permits and in project-related credits are discussed. (Author)

  15. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  16. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  17. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ...-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to take (capture...-listed Drosophila species on the island of Kauai in the State of Hawaii for the purpose of enhancing its... in the State of Hawaii: Astelia waialealae (painiu), Canavalia napaliensis (awikiwiki), Chamaesyce...

  18. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  19. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit. (a) An elephant, hippopotamus, rhinoceros, or tapir shall not be imported into the United States... export an elephant, hippopotamus, rhinoceros, or tapir to the United States; (2) The name and address of...

  20. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  1. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    ... an amount qualifying as hazardous material. (modes 1, 2, 3, 4) 15860-N......... Apple Inc. 49 CFR To... strength stiffness. 13581-M......... Bengal Products 49 CFR To modify the Inc. Baton 173.306(a)(3). special............ Carleton 49 CFR 173.302a To modify the Technologies special permit to Inc. (Former change a drawing Grantee...

  2. 50 CFR 648.4 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... carrying passengers for hire. (8) Atlantic bluefish vessels. (i) Commercial. Any vessel of the United... lands Atlantic bluefish in or from the EEZ in excess of the recreational possession limit specified at § 648.164 must have been issued and carry on board a valid commercial bluefish vessel permit. (ii) Party...

  3. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  4. Taxes, permits, and the diffusion of a new technology

    International Nuclear Information System (INIS)

    Coria, Jessica

    2009-01-01

    This study looks at the effects of the choice between taxes and permits on the pattern of adoption of a new (pollution) emissions abatement technology. It uses a dynamic setting, where the regulator observes the arrival and initial use of the technology and determines the optimal ex post amount of emissions before firms start to adopt the technology. In the model here, the adoption benefits and costs depend on the number of firms that are already using the technology. Thus, each firm decides the optimal date to adopt the technology, considering its benefits and costs, as well as the advantage they will gain over their rivals, producing a sequence of adoption that is ''diffused'' into the industry over time. With this framework, the study shows that when the output demand is elastic, auctioned permits induce an earlier diffusion than taxes. (author)

  5. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  6. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  7. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  8. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  9. 224-T Transuranic Waste Storage and Assay Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-01-01

    Westinghouse Hanford Company is a major contractor to the US Department of Energy Richland Field Office and serves as cooperator of the 224-T Transuranic Waste Storage and Assay Facility, the storage unit addressed in this permit application. At the time of submission of this portion of the Hanford Facility. Dangerous Waste Permit Application covering the 224-T Transuranic Waste Storage and Assay Facility, many issues identified in comments to the draft Hanford Facility Dangerous Waste Permit remain unresolved. This permit application reflects the positions taken by the US Department of Energy, Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application (Revision 0) consists of both a Part A and Part B permit application. An explanation of the Part A revisions associated with this unit, including the Part A revision currently in effect, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application contains information current as of March 1, 1992

  10. The Clean-Development Mechanism, stochastic permit prices and energy investments

    International Nuclear Information System (INIS)

    Hieronymi, Philipp; Schüller, David

    2015-01-01

    We analyze the impact on energy investments stemming from different emission permit classes, by considering permits that are allocated inside the European Emission Trading Scheme and secondary Certified Emission Reduction (sCER) permits originating from the Clean Development Mechanism. One price taking firm which is subject to emission regulation has the choice to invest in gas or wind power plant. The firm faces uncertainty regarding stochastically evolving permit prices, while it receives a premium on the electricity price for wind energy. As a first step, we determine the value of the option to invest into a gas power plant over time. Then, we calculate the investment probability of a gas power investment in a range of policy scenarios. We find that allowing the usage of sCER permits in the present policy framework has a positive impact on gas power investment. Decoupling the price processes has a similar effect. If the quota of sCER permits is doubled, the decrease in the investment probability for wind power is large. We carry out sensitivity tests for different parameter values, and find that investment behavior changes significantly with differing interest rates, the wind energy premium and volatility. - Highlights: • We model the impact of two CO 2 permit classes on energy investments. • We present a real-options framework accounting for uncertainty. • Clean Development Mechanism permits have a negative influence on investment into renewable energy. • Interest rate and volatility values have a strong impact on the results

  11. Frictions in Project-Based Supply of Permits

    International Nuclear Information System (INIS)

    Liski, M.; Virrankoski, J.

    2004-01-01

    Emissions trading in climate change can entail large overall cost savings and transfers between developed and developing countries. However, the search for acceptable JI or CDM projects implies a deviation from the perfect market framework used in previous estimations. Our model combines the search market for projects with a frictionless permit market to quantify the supply-side frictions in the CO2 market. We also decompose the effects of frictions into the effects of search friction, bargaining, and bilateralism. A calibration using previous cost estimates of CO2 reductions illustrate changes in cost savings and allocative implications

  12. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  13. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    This report is part of a dangerous waste permit application for the storage of wastes from the Purex process at Hanford. Appendices are presented on the following: construction drawings; HSW-5638, specifications for disposal facility for failed equipment, Project CA-1513-A; HWS-8262, specification for Purex equipment disposal, Project CGC 964; storage tunnel checklist; classification of residual tank heels in Purex storage tunnels; emergency plan for Purex facility; training course descriptions; and the Purex storage tunnels engineering study

  14. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  15. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  16. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  17. Meeting NPDES permit limits for an effluent-dependent stream

    International Nuclear Information System (INIS)

    Payne, W.L.

    1998-01-01

    When the Savannah River Site in Aiken, South Carolina received a National Pollutant Discharge Elimination System permit containing very low copper and toxicity limits for an effluent-dependent stream, an innovative and cost-effective method to meet them was sought. The South Carolina Department of Health and Environmental Control mandated that compliance with the new limits be achieved within three years of the effective date of the permit. SRS personnel studied various regulatory options for complying with the new limits including Water Effect Ratio, use of a Metals Translator, blending with additional effluents, and outfall relocation. Regulatory options were determined to not be feasible because the receiving stream is effluent dependent. Treatment options were studied after it was determined that none of the regulatory pathways were viable. Corrosion inhibitors were evaluated on a full-scale basis with only limited benefits. Ion exchange was promising, but not cost effective for a high flow effluent with a very low concentration of copper. A treatment wetlands, not normally given consideration for the removal of metals, proved to be the most cost effective method studied and is currently under construction

  18. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  19. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  20. Run permit software for the proton storage ring

    International Nuclear Information System (INIS)

    Bair, S.S.

    1985-01-01

    The Run Permit system is intended to protect equipment from radiation effects caused by having beam enabled when required equipment is not operational. This system will not allow beam unless certain devices are ready and will drop beam if any of these devices become inoperative. A system to provide such protection might be implemented in hardware. However, because the several operating modes of the Proton Storage Ring/Weapons Neutron Research facility require certain devices to be in different states (depending on mode), a dynamic configuration capability is needed, that is, a software solution is more feasible

  1. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  2. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Science.gov (United States)

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  3. Tradable permit allocations and sequential choice

    Energy Technology Data Exchange (ETDEWEB)

    MacKenzie, Ian A. [Centre for Economic Research, ETH Zuerich, Zurichbergstrasse 18, 8092 Zuerich (Switzerland)

    2011-01-15

    This paper investigates initial allocation choices in an international tradable pollution permit market. For two sovereign governments, we compare allocation choices that are either simultaneously or sequentially announced. We show sequential allocation announcements result in higher (lower) aggregate emissions when announcements are strategic substitutes (complements). Whether allocation announcements are strategic substitutes or complements depends on the relationship between the follower's damage function and governments' abatement costs. When the marginal damage function is relatively steep (flat), allocation announcements are strategic substitutes (complements). For quadratic abatement costs and damages, sequential announcements provide a higher level of aggregate emissions. (author)

  4. PSD Permit for the Marblehead Lime Company

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. Honda Permits to Install 1 Year Aggregation

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2005 and... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871...

  7. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  8. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  9. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... purpose of enhancing the species' survival. Permit No. TE-99477A Applicant: Benjamin S. Wallace, Fairfield...-99473A Applicant: Joseph D. Henry, San Diego, California The applicant requests a permit to take (capture...

  10. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...: EA Engineering, Science, and Technology, Lewisville, Texas. Applicant requests a new permit for... atricapilla) within Texas. Permit TE-37047A Applicant: Sea World Parks and Entertainment, San Antonio, Texas...

  11. 76 FR 35235 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-06-16

    ... chub (Gila intermedia), Gila topminnow (Poeciliopsis occidentalis occidentalis), humpback chub (Gila... intermedia) within Arizona. Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant...), and Gila chub (Gila intermedia) within Arizona. Permit TE-118414 Applicant: Cherokee Nation, Tahlequah...

  12. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  13. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  14. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  15. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  16. Are LMFBR permits unconstitutional. [German Feferal Republic

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, H; Ziegler, E

    1977-12-01

    The August 18, 1977 decision by the Muenster Higher Administrative Court to have the Federal Constitutional Court investigate the constitutionality of permits granted for fast breeder power plants has aroused much attention, both in the FRG and in other countries. This is the first time that the German Atomic Energy Act is being questioned with respect to the separation of powers between legislative and executive authorities and also with respect to the principle of a constitutional state. As a result of their analysis of the first information available about the court decision the authors have some doubts as to whether the views held by the court about the consequences of the development of fast breeder reactors and of the permit granted for the SNR 300 demonstration nuclear power station are essentially correct. In view of the wording of and the official comments on the incriminated Section 7 of the Atomic Energy Act and the large number of subsequent leading decisions by the Federal Diet about fast breeder reactors also the concern about the constitutionality of that reactor line appears to be unfounded.

  17. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  18. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  19. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  20. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...

  1. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  2. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  3. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  4. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  5. 40 CFR 52.2184 - Operating permits for minor sources.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52... permits for minor sources. Emission limitations and related provisions established in South Dakota minor... right to deem permit conditions not federally enforceable. Such a determination will be made according...

  6. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  7. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  8. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  9. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  10. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... special permit Lincoln, NE. to authorize an alternative fire protection system. 11624-M Clean Harbors 49... Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special Permit Applications. SUMMARY: In accordance with the procedures...

  11. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  12. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  13. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  14. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  15. Joint Implementation, Clean Development Mechanism and Tradable Permits

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, L.; Rose Olsen, K.

    2000-06-01

    This report deals with international environmental instruments aimed at a cost-effective reduction of greenhouse gas emissions. More precisely the instruments mentioned in the Kyoto Protocol, namely Joint Implementation (JI), the Clean Development Mechanism (CDM) and Tradable Permits (TP). The report describes the background for the international co-operation on reducing the greenhouse gases and the background for the instruments. How the instruments work in theory and what the practical problems may be. What agents' incentives are when they engage in JI or CDM, and how the initiation of the instruments can be organised. The institutional frameworks for JI, CDM and TP are discussed. The report describes how the Kyoto instruments and the Kyoto commitments interact with other instruments and describe distributive effects between countries. It is analysed how the use of CDM may influence the developing countries incentives to participate in the coalition of committed countries. In the concluding chapter some recommendations on the use of JI, TP and CDM are given. The recommendations are a kind of dialog with especially the Norwegian and Swedish reports on tradable permits. Some of the issues described in this main report are analysed in separate working papers. The working papers are collected in an appendix to the main report. (au)

  16. Joint Implementation, Clean Development Mechanism and Tradable Permits

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, L; Rose Olsen, K

    2000-06-01

    This report deals with international environmental instruments aimed at a cost-effective reduction of greenhouse gas emissions. More precisely the instruments mentioned in the Kyoto Protocol, namely Joint Implementation (JI), the Clean Development Mechanism (CDM) and Tradable Permits (TP). The report describes the background for the international co-operation on reducing the greenhouse gases and the background for the instruments. How the instruments work in theory and what the practical problems may be. What agents' incentives are when they engage in JI or CDM, and how the initiation of the instruments can be organised. The institutional frameworks for JI, CDM and TP are discussed. The report describes how the Kyoto instruments and the Kyoto commitments interact with other instruments and describe distributive effects between countries. It is analysed how the use of CDM may influence the developing countries incentives to participate in the coalition of committed countries. In the concluding chapter some recommendations on the use of JI, TP and CDM are given. The recommendations are a kind of dialog with especially the Norwegian and Swedish reports on tradable permits. Some of the issues described in this main report are analysed in separate working papers. The working papers are collected in an appendix to the main report. (au)

  17. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Science.gov (United States)

    2010-08-06

    ... Presidential Permit No. PP-22, as amended, to BC Hydro. The application requested that the Department of Energy... the transmission of electric energy between the United States and a foreign country is prohibited in... law pursuant to British Columbia's Clean Energy Act. Since restructuring of the electric power...

  18. 50 CFR 22.26 - Permits for eagle take that is associated with, but not the purpose of, an activity.

    Science.gov (United States)

    2010-10-01

    ...) Other interests. (5) Any additional factors that may be relevant to our decision whether to issue the..., SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) EAGLE PERMITS... cumulative effects of other permitted take and other additional factors affecting eagle populations; (ii...

  19. 77 FR 8855 - Final Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction in...

    Science.gov (United States)

    2012-02-15

    ... determined that reissuance of this general permit is not likely to adversely affect Essential Fish Habitat... that issuance of the permit has no adverse effect to Essential Fish Habitat. Coastal Zone Management... initiated section 7 consultations in accordance with the Endangered Species Act with the U.S. Fish and...

  20. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  1. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  2. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  3. A decision aid tool for equity issues analysis in emission permit allocations

    International Nuclear Information System (INIS)

    Vaillancourt, K.; Waaub, J.P.

    2004-01-01

    The general intention of global climate agreements is to stabilize greenhouse gases (GHG) concentrations in the atmosphere which contribute to climate change. Climate models indicate that the global average temperature will increase by about 1.4 to 5.8 degrees C by 2100 compared to the 1990 level. This study assumed the participation of all countries, including developing countries, to achieve a global GHG stabilization target. It examined international cooperation mechanisms such as permit trading to achieve global economic efficiency. The study proposed a decision aid tool that provides relevant information on various equitable permit allocation schemes. A dynamic multicriterion model was presented to share the global quantity of permits among 15 regions. Multiple definitions of equity were considered. A realistic simulation of the World-MARKAL energy model was conducted to demonstrate the potential application of the scheme in international negotiations. The goal was to propose a range of permit allocations for each country in order to restrict the number of possibilities and guide negotiations. A model of the global reduction scenario makes it possible to determine cost effective solutions and to calculate reduction costs. Equity issues related to permit allocations were also addressed along with permit allocations and net reduction costs for each region. 45 refs., 5 tabs., 2 figs., 1 appendix

  4. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  5. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  6. Trading Hot-Air. The Influence of Permit Allocation Rules, Market Power and the US Withdrawal from the Kyoto Protocol

    International Nuclear Information System (INIS)

    Klepper, G.; Peterson, S.

    2005-01-01

    After the conferences in Bonn and Marrakech, it is likely that international emissions trading will be realized in the near future. Major influences on the permit market are the institutional detail, the participation structure and the treatment of hot-air. Different scenarios not only differ in their implications for the demand and supply of permits and thus the permit price, but also in their allocative effects. In this paper we discuss likely the institutional designs for permit allocation in the hot-air economies and the use of market power and quantify the resulting effects by using the computable general equilibrium model DART. It turns out that the amount of hot-air supplied will be small if hot-air economies cooperate in their decisions. Under welfare maximization, more hot-air is supplied than in the case where governments try to maximize revenues from permit sales

  7. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  8. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  9. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    The PUREX Storage Tunnels are a mixed waste storage unit consisting of two underground railroad tunnels: Tunnel Number 1 designated 218-E-14 and Tunnel Number 2 designated 218-E-15. The two tunnels are connected by rail to the PUREX Plant and combine to provide storage space for 48 railroad cars (railcars). The PUREX Storage Tunnels provide a long-term storage location for equipment removed from the PUREX Plant. Transfers into the PUREX Storage Tunnels are made on an as-needed basis. Radioactively contaminated equipment is loaded on railcars and remotely transferred by rail into the PUREX Storage Tunnels. Railcars act as both a transport means and a storage platform for equipment placed into the tunnels. This report consists of part A and part B. Part A reports on amounts and locations of the mixed water. Part B permit application consists of the following: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report

  10. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...... to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices isanalysed. To analyse the connection between CO_2 permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat...

  11. Issues in third party attacks on SMCRA permits. [USA - Indiana

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, G.D. Jr. (Ice Miller Donadio Ryan, Indianapolis, IN (USA))

    1990-01-01

    Legal issues which have occurred in third party attacks on SMCRA (Surface Mining Control and Reclamation Act) permit, mainly in Indiana, are discussed. Problems that can occur with the interrelationship of common law nuisance/injunction actions, the permit process, enforcement proceedings and collateral estoppel from administrative agency action, as well as finality issues in the permit process as related to other provisions of SMCRA. 37 refs.

  12. Liquid effluent retention facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This appendix to the Liquid Effluent Retention Facility Dangerous Waste Permit Application contains pumps, piping, leak detection systems, geomembranes, leachate collection systems, earthworks and floating cover systems

  13. Proposed Issuance of NPDES Permit for NTUA Kayenta WWTF

    Science.gov (United States)

    Public Notice of proposed Issuance of National Pollutant Discharge Elimination System Permit (NPDES No. NN0020281) for Navajo Tribal Utility Authority (“NTUA”) Kayenta Wastewater Treatment Facility.

  14. 75 FR 66123 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-10-27

    ... enhancing their survival. Permit No. TE-24582A Applicant: Russell C. Croel, Folsom, California. The..., Contra Costa, Fresno, Glenn, Kings, Merced, Placer, Sacramento, San Joaquin, Shasta, Solano, Stanislaus...

  15. 78 FR 9067 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2013-02-07

    ... County, Alabama. Permit Application Number: TE-91366A Applicant: Dr. Paul Stewart, Troy, Alabama...: TE-91373A Applicant: Jonathan Miller, Troy, Alabama. Applicant requests authorization to take...

  16. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  17. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  18. Major ion toxicity in effluents: A review with permitting recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Goodfellow, W.L.; Ausley, L.W.; Burton, D.T.; Denton, D.L.; Dorn, P.B.; Grothe, D.R.; Heber, M.A.; Norberg-King, T.J.; Rodgers, J.H. Jr.

    2000-01-01

    Effluent toxicity testing methods have been well defined, but for the most part, these methods do not attempt to segregate the effects of active ionic concentrations and ion imbalances upon test and species performances. The role of various total dissolved solids in effluents on regulatory compliance has emerged during the last few years and has caused confusion in technical assessment and in permitting and compliance issues. This paper assesses the issue of ionic strength and ion imbalance, provides a brief summary of applicable data, presents several case studies demonstrating successful tools to address toxicity resulting from salinity and ion imbalance, and provides recommendations for regulatory and compliance options to manage discharges with salinity/ion imbalance issues. Effluent toxicity resulting from inorganic ion imbalance and the ion concentration of the effluent is pervasive in permitted discharge from many industrial process and municipal discharges where process streams are concentrated, adjusted, or modified. This paper discusses procedures that use weight-of-evidence approaches to identify ion imbalance toxicity, including direct measurement, predictive toxicity models for freshwater, exchange resins, mock effluents, and ion imbalance toxicity with tolerant/susceptible test species. Cost-effective waste treatment control options for a facility whose effluent is toxic because of total dissolved solids (TDS) or because of specific ion(s) are scarce at best. Depending on the discharge situation, TDS toxicity may not be viewed with the same level of concern as other, more traditional, toxicants. These discharge situations often do not require the conservative safety factors required by other toxicants. Selection of the alternative regulatory solutions discussed in this paper may be beneficial, especially because they do not require potentially expensive or high-energy-using treatment options that may be ineffective control options. The information

  19. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  20. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  1. Quantifying the CO{sub 2} permit price sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Gruell, Georg; Kiesel, Ruediger [Duisburg-Essen Univ., Essen (Germany). Inst. of Energy Trading and Financial Services

    2012-06-15

    Equilibrium models have been widely used in the literature with the aim of showing theoretical properties of emissions trading schemes. This paper applies equilibrium models to empirically study permit prices and to quantify the permit price sensitivity. In particular, we demonstrate that emission trading schemes both with and without banking are inherently prone to price jumps. (orig.)

  2. 36 CFR 228.54 - Single entry sales or permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Single entry sales or permits... MINERALS Disposal of Mineral Materials General Provisions § 228.54 Single entry sales or permits. The... plan which describes operating procedures and reclamation measures, unless the requirement is waived by...

  3. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  4. 46 CFR 78.40-10 - No smoking permitted.

    Science.gov (United States)

    2010-10-01

    ... § 78.40-10 No smoking permitted. (a) The master shall have appropriate “No Smoking” signs posted and shall take all necessary precautions to prevent smoking or carrying of lighted or smoldering cigars... 46 Shipping 3 2010-10-01 2010-10-01 false No smoking permitted. 78.40-10 Section 78.40-10 Shipping...

  5. 77 FR 74507 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-12-14

    ... not operate to the disadvantage of the endangered species, and (3) the granted permit would be.... Zoological Park. 2012. 82880A Big Game Studio 77 FR 54604; September 5, October 17, 2012. 2012. 83520A Donald...; fax (703) 358-2280. Brenda Tapia, Program Analyst/Data Administrator, Branch of Permits, Division of...

  6. 76 FR 39368 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-07-06

    ... promulgating migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or other...). Background In response to public interest in the use of trained raptors to haze (scare) depredating and other...

  7. Wilderness Management... A Computerized System for Summarizing Permit Information

    Science.gov (United States)

    Gary H. Elsner

    1972-01-01

    Permits were first needed for visits to wilderness areas in California during summer 1971. A computerized system for analyzing these permits and summarizing information from them has been developed. It produces four types of summary tables: point-of-origin of visitors; daily variation in total number of persons present; variations in group size; and variations in...

  8. 19 CFR 12.99 - Procedures for permitted entry.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Procedures for permitted entry. 12.99 Section 12.99 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY SPECIAL CLASSES OF MERCHANDISE Switchblade Knives § 12.99 Procedures for permitted entry...

  9. 76 FR 74070 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2011-11-30

    ... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Dated: November 21, 2011. Lynn M. Lewis...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  10. 78 FR 9415 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-02-08

    ...). Authority: The authority for this notice is the Endangered Species Act of 1973, as amended (16 U.S.C. 1531...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  11. 78 FR 57410 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  12. 75 FR 45650 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N149; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of an application to...

  13. 76 FR 8374 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N021; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  14. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: In accordance with the requirements of the...

  15. 76 FR 33334 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N112; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  16. 75 FR 52012 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N181; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  17. 75 FR 5101 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-02-01

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N010; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  18. 76 FR 18576 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N056; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  19. 76 FR 10063 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-23

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N026; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  20. 75 FR 27361 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N095; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  1. 75 FR 20621 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2009-N0054]; [30120-1113-0000-F6] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: We, the U.S. Fish and...

  2. 43 CFR 13.4 - Terms of permit.

    Science.gov (United States)

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  3. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  4. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  5. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... modify the special permit Town, South Africa. 178.277(b)(1). to increase the water capacity from 17000... prevent leakage during transportation. (mode 1). 15667-N Volga Dnepr--UNIQUE AIR 49 CFR 172.101 Column To...). NEW SPECIAL PERMIT WITHDRAWN 15494-N Johnson Controls Battery 49 CFR 173.159 To authorize the Group...

  6. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  7. 48 CFR 52.247-2 - Permits, Authorities, or Franchises.

    Science.gov (United States)

    2010-10-01

    ... Franchises. 52.247-2 Section 52.247-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....247-2 Permits, Authorities, or Franchises. As prescribed in 47.207-1(a), insert the following clause: Permits, Authorities, or Franchises (JAN 1997) (a) The offeror does □, does not □, hold authorization from...

  8. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  9. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  10. 29 CFR 1910.146 - Permit-required confined spaces.

    Science.gov (United States)

    2010-07-01

    ... any failure of hazard control or monitoring equipment) or event internal or external to the permit... could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and... complying with the permit space requirements that apply to all employers, each contractor who is retained to...

  11. 75 FR 52965 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-08-30

    ... appointment only, during normal business hours at the U.S. Fish and Wildlife Service, 500 Gold Ave., SW., Room... permit for research and recovery purposes to conduct presence/absence surveys for American burying beetle...., Round Rock, Texas. Applicant requests an amendment to a current permit for research and recovery...

  12. 50 CFR 21.27 - Special purpose permits.

    Science.gov (United States)

    2010-10-01

    ... certification required by part 13 and makes a sufficient showing of benefit to the migratory bird resource..., salvage, otherwise acquire, transport, or possess migratory birds, their parts, nests, or eggs for any... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose...

  13. 9 CFR 73.10 - Permitted dips; substances allowed.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Permitted dips; substances allowed. 73.10 Section 73.10 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT... flowers of sulphur or sulphur flour to 100 gallons of water; or a specifically permitted proprietary brand...

  14. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted...

  15. 78 FR 76171 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-12-16

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and...: Geoffrey Ridder; Utopia, TX; PRT-00030B The applicant requests a permit to export the sport-hunted trophy... period. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  16. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  17. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  18. 29 CFR 2.12 - Audiovisual coverage permitted.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audiovisual coverage permitted. 2.12 Section 2.12 Labor Office of the Secretary of Labor GENERAL REGULATIONS Audiovisual Coverage of Administrative Hearings § 2.12 Audiovisual coverage permitted. The following are the types of hearings where the Department...

  19. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-10-12

    ... from Helianthus paradoxus (Pecos sunflower) from plants in Texas. Permit TE-829761 Applicant: Bureau of... for endangered plant species, and 50 CFR 17.72 for threatened plant species. Applications Available...: Texas A & M University, Galveston, Texas. Applicant requests a new permit for husbandry and holding of...

  20. 75 FR 67765 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-11-03

    ... collect leaf tissue and seeds from the following endangered plants: South Texas ambrosia (Ambrosia... transportation, at the Miller Park Zoo. Permit TE-24625A Applicant: Wendy Leonard, San Antonio, Texas. Applicant...-cheeked warbler (Dendroica chrysoparia) and black-capped vireo (Vireo atricapilla) within Texas. Permit TE...

  1. 78 FR 14110 - Emergency Issuance of Endangered Species Permit

    Science.gov (United States)

    2013-03-04

    ... issued an endangered species permit to address emergency veterinary care for an injured green sea turtle...] Emergency Issuance of Endangered Species Permit AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered and threatened species under section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended...

  2. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  3. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... and recovery purposes to conduct pollination on 36 individual adult Arizona hedgehog cactus.... Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant requests an amendment to a... Aquarium, Grapevine, Texas. Permit TE-92366A Applicant: Kimley-Horn and Associates, Inc., Dallas, Texas...

  4. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  5. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  6. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  7. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  8. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  9. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  10. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  11. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  12. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  13. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  14. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  15. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  16. 33 CFR 325.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... process. Whenever the district engineer becomes aware of planning for work which may require a DA permit... in the basic timing sequence used by the Corps of Engineers in processing applications for DA permits.... Upon receipt of such request, the district engineer will assure the conduct of an orderly process which...

  17. 40 CFR 76.9 - Permit application and compliance plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Permit application and compliance plans. 76.9 Section 76.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.9 Permit application and...

  18. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  19. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  20. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  1. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  2. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  3. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  4. 25 CFR 166.223 - Can I use a permit as collateral for a loan?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can I use a permit as collateral for a loan? 166.223... PERMITS Permit Requirements Permit (leasehold) Mortgage § 166.223 Can I use a permit as collateral for a loan? We may approve a permit containing a provision that authorizes the permittee to encumber the...

  5. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  6. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  7. 30 CFR 774.12 - Post-permit issuance information requirements for permittees.

    Science.gov (United States)

    2010-07-01

    ... for permittees. 774.12 Section 774.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... competent jurisdiction grants a stay of the cessation order and the stay remains in effect. (c) Within 60...

  8. 76 FR 39018 - Commercial Driver's License Testing and Commercial Learner's Permit Standards; Corrections

    Science.gov (United States)

    2011-07-05

    ... [Docket No. FMCSA-2007-27659] RIN 2126-AB02 Commercial Driver's License Testing and Commercial Learner's..., 2011, that will be effective on July 8, 2011. This final rule amends the commercial driver's license... to issue the commercial learner's permit (CLP). Since the final rule was published, FMCSA identified...

  9. 75 FR 67093 - Iceberg Water Deviating From Identity Standard; Temporary Permit for Market Testing

    Science.gov (United States)

    2010-11-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-P-0517... Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug Administration (FDA) is announcing that a... mass production problems, and assess commercial feasibility. DATES: This permit is effective for 15...

  10. 75 FR 62850 - Endangered and Threatened Wildlife and Plants; Permit; Habitat Conservation Plan for Operation...

    Science.gov (United States)

    2010-10-13

    ... management and predator control in the Hono o Na Pali Natural Area Reserve; (4) updating estimates of at-sea... location during the fourth and fifth year of the permit. The work that KIUC proposes to carry out is... effects that implementation of any reasonable alternatives could have on endangered and threatened species...

  11. 78 FR 12418 - Office of Hazardous Materials Safety Actions on Special Permit Applications

    Science.gov (United States)

    2013-02-22

    ... Permits. It should be noted that some of the sections cited were those in effect at the time certain... 133 172.200; Rotorcraft External 172.301(c); Load Operations, 175.75. attached to or suspended from an... Division 1.3 Fireworks within the State of Alaska where no other means of transportation is available...

  12. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    NARCIS (Netherlands)

    Kruitwagen, S.

    1996-01-01

    7.1 Introduction
    This study has examined the question of whether a system of tradeable emission permits can contribute to a cost-effective reduction of SO 2 emissions in Europe, taking into account

  13. 7 CFR 330.203 - Action on applications for permits to move plant pests; form of and conditions in permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Action on applications for permits to move plant pests... PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.203 Action on applications for permits to move plant pests; form of and conditions in...

  14. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  15. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  16. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  17. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  18. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  19. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  20. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  1. Pricing emission permits in the absence of abatement

    International Nuclear Information System (INIS)

    Hintermann, Beat

    2012-01-01

    If emissions are stochastic and firms are unable to control them through abatement, the cap in a permit market may be exceeded, or not be reached. I derive a binary options pricing formula that expresses the permit price as a function of the penalty for noncompliance and the probability of an exceeded cap under the assumption of no abatement. I apply my model to the EU ETS, where the rapid introduction of the market made it difficult for firms to adjust their production technology in time for the first phase. The model fits the data well, implying that the permit price may have been driven by firms hedging against stochastic emissions.

  2. Lessons from Queensland's last-drinks legislation: The use of extended trading permits.

    Science.gov (United States)

    Zahnow, Renee; Miller, Peter; Coomber, Kerri; de Andrade, Dominique; Ferris, Jason

    2018-05-01

    The association between alcohol availability, alcohol consumption and, in turn, alcohol-related harms is well established. Policies to reduce alcohol-related harms focus on limiting accessibility through the regulation of the liquor industry, including trading hours. On 1 July 2016, the Queensland Government introduced legislation to reduce ordinary liquor trading hours, replacing 5 am closing times with 3 am cessation of liquor sales in designated entertainment precincts and 2 am cessation of sales across the rest of the state. However, the amendment was under-inclusive and did not apply to temporary extended trading permits, a provision of the Liquor Act 1992 allowing one-off variations in trading hours for special events. We use 24 months of data (1 January 2015 to 31 December 2016) from the Office of Liquor Gaming and Regulation to explore patterns of extended trading permit use across Queensland, pre- and post- 1 July 2016. We find that following the Amendment in 2016 there was also a distinct shift in the utilisation of temporary extended trading permits, with a 63% increase in approved permits between 2015 and 2016. Temporal clustering around key calendar events dissipated following 1 July 2016 with consistent concentration of permit utilisation over consecutive weeks. Using temporary extended trading permits venue owners avoided earlier closing times and continued to operate until 5 am. The findings provide lessons for future policy implementation by illustrating the capacity for under-inclusive legislation to result in the dilution of intended effects. © 2018 Australasian Professional Society on Alcohol and other Drugs.

  3. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  4. Storm Water General Permit 3 for Rock and Asphalt

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #3 for storm water discharges associated with industrial activity for Asphalt Plants, Concrete Batch Plants, Rock Crushing Plants and Construction...

  5. 77 FR 49453 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-16

    ... citations to, and analyses of, the applicable laws and regulations. We will not consider or include in our... period. Applicant: Alexandria Rosati, Cambridge, MA; PRT-72061A The applicant requests a permit to...

  6. 75 FR 34766 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2007and.... Applicant: United States Department of Agriculture/Animal and Plant Health Inspection Service/Wildlife...

  7. 50 CFR 25.55 - Refuge admission permits.

    Science.gov (United States)

    2010-10-01

    ...-specific permits, at Fish and Wildlife Service Regional and Washington, DC Offices, and at other locations....55 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR... the holder on the front. ...

  8. Oversize/overweight vehicle unified permitting process (UPP) : phase I.

    Science.gov (United States)

    2017-08-01

    Multiple jurisdictions within Minnesota process oversize/overweight (OSOW) permits for the movement of freight on state roadways, county roads, and municipal and township streets. Movement of freight has increased in recent years to help support econ...

  9. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  10. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  11. 36 CFR 296.10 - Suspension and revocation of permits.

    Science.gov (United States)

    2010-07-01

    ... AGRICULTURE PROTECTION OF ARCHAEOLOGICAL RESOURCES: UNIFORM REGULATIONS § 296.10 Suspension and revocation of... correct the situation which led to suspension of the permit. (b) Suspension or revocation for management...

  12. 78 FR 75369 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-12-11

    ... into the wild in Oklahoma. Permit TE-833851 Applicant: City of Austin Watershed Protection Department... reddelli) Black-capped vireo (Vireo atricapilla) Bone Cave harvestman (Texella reyesi) Braken Bat Cave...

  13. Storm Water General Permit 1 for Industrial Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #1 for storm water discharges associated with industrial facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES) program.

  14. 48 CFR 52.236-7 - Permits and Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws... negligence. The Contractor shall also be responsible for all materials delivered and work performed until...

  15. NPDES Permit for Crow Nation Water Treatment Plants in Montana

    Science.gov (United States)

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  16. 75 FR 30428 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-01

    ... (Oreonax flavicauda) from Peru for the purpose of enhancement of the species through scientific research... be conducted under the remainder of the 5-year period of the permit. Applicant: Natural History...

  17. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  18. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  19. 77 FR 3493 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2012-01-24

    ..., Moseley, VA; PRT-57466A. The applicant requests a permit to import 6 female captive-born cheetahs (Acinonyx jubatus jubatus) from De Wildt Cheetah Breeding Centre, De Wildt, South Africa for the purpose of...

  20. 9 CFR 72.13 - Permitted dips and procedures.

    Science.gov (United States)

    2010-01-01

    ... proprietary brands of permitted dips—as well the use of compressed air, vat management techniques, and other... maintained and that under actual field conditions the dipping of cattle with a solution of definite strength...

  1. 76 FR 27660 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-05-12

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... applicant requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus...

  2. 76 FR 20705 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2011-04-13

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  3. 78 FR 59052 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-09-25

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  4. 78 FR 45954 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-07-30

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  5. 76 FR 52965 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-24

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  6. 75 FR 63196 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-14

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  7. 75 FR 76022 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-07

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... public display. Multiple Applicants The following applicants each request a permit to import the sport...

  8. 76 FR 39432 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-07-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants (New Applications) The following applicants each request a permit to import the sport...

  9. 78 FR 112 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-02

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  10. 78 FR 62647 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-10-22

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  11. 77 FR 72882 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-12-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  12. 75 FR 41235 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-15

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... the species. Multiple Applicants The following applicants each request a permit to import the sport...

  13. 78 FR 21627 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-04-11

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... Tapiridae Applicant: Michael Tomb, Jackson, LA; PRT-01602B The applicant requests a permit to import a sport...

  14. 75 FR 44986 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  15. 76 FR 51051 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-17

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  16. 76 FR 32223 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-06-03

    ... studies; and (2) Those that include citations to, and analyses of, the applicable laws and regulations. We... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  17. 76 FR 80384 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-12-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  18. 76 FR 60862 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... The following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  19. 75 FR 19656 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-04-15

    ... agency decisions are: (1) Those supported by quantitative information or studies; and (2) Those that... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  20. 76 FR 72434 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  1. 76 FR 65207 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-10-20

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  2. 76 FR 71069 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-16

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  3. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  4. 77 FR 7175 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2012-02-10

    ...: Wildlife World Zoo, Litchfield Park, Arizona. Applicant requests an amendment to a current permit for... following species within Texas: Bee Creek Cave harvestman (Texella reddelli) Bone Cave harvestman (Texella...

  5. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...

  6. 75 FR 14627 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-03-26

    ... Zoological, LLC, Greenwich, CT; PRT-01671A The applicant requests a permit to import a female cheetah (Acrinonyx jubatus) from DeWildt Cheetah Breeding Centre, South Africa where the individual cheetah was...

  7. 75 FR 53689 - Issuance of an Experimental Use Permit

    Science.gov (United States)

    2010-09-01

    ... INFORMATION CONTACT: Gina Casciano, Biopesticides and Pollution Prevention Division (7511P), Office of..., Experimental use permits. Dated: August 19, 2010. W. Michael McDavit, Acting Director, Biopesticides and...

  8. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  9. Transportation of Large Wind Components: A Permitting and Regulatory Review

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cook, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This report summarizes permitting and regulatory issues associated with transporting wind turbine blades, towers, and nacelles as well as large transformers (wind components). These wind components are commonly categorized as oversized and overweight (OSOW) and require specific permit approvals from state and local jurisdictions. The report was developed based on a Quadrennial Energy Review (QER) recommendation on logistical requirements for the transportation of 'oversized or high-consequence energy materials, equipment, and components.'

  10. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  11. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  12. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  13. Tradeable emission permit in Dutch acidification abatement policy

    Energy Technology Data Exchange (ETDEWEB)

    Ruyssenaars, P; Sliggers, J [Ministry of Environment (Netherlands)

    1996-12-31

    Target groups as well as the government are under the spell of economic instruments as part of environmental policy. Under this heading fall (regulatory) taxes and tradeable emission permits (VER). Of the two, VER, particularly, receive a lot of attention. From the target groups, because the flexibility of VER means working cost-effectively, which could lead to cost savings. From the government, because it can have more faith in the viability of emission ceilings, and has less need to pass detailed legislation. The latter conforms nicely to the philosophy `government at arm`s length`. The Ministry of Environment has had a study made on the feasibility of VER in the context of the acidification abatement policy in the Netherlands. The development and implementation of policy concerning acidification abatement is at an advanced stage, with deposition targets already set for 2000 and 2010 (2400 and 1400 acid equivalents/ha/year, respectively, averaged for afforested areas). From these, also emission reduction targets per target group are deduced, which can be used in a VER system. The main starting point of the study was to gain more insight into the practical aspects of VER. One important question is what form a VER system for the Netherlands should have to take. Also, an investigation was made into the activities which are necessary to introduce a VER system as well as the time, manpower and money these activities entail

  14. Tradeable emission permit in Dutch acidification abatement policy

    Energy Technology Data Exchange (ETDEWEB)

    Ruyssenaars, P.; Sliggers, J. [Ministry of Environment (Netherlands)

    1995-12-31

    Target groups as well as the government are under the spell of economic instruments as part of environmental policy. Under this heading fall (regulatory) taxes and tradeable emission permits (VER). Of the two, VER, particularly, receive a lot of attention. From the target groups, because the flexibility of VER means working cost-effectively, which could lead to cost savings. From the government, because it can have more faith in the viability of emission ceilings, and has less need to pass detailed legislation. The latter conforms nicely to the philosophy `government at arm`s length`. The Ministry of Environment has had a study made on the feasibility of VER in the context of the acidification abatement policy in the Netherlands. The development and implementation of policy concerning acidification abatement is at an advanced stage, with deposition targets already set for 2000 and 2010 (2400 and 1400 acid equivalents/ha/year, respectively, averaged for afforested areas). From these, also emission reduction targets per target group are deduced, which can be used in a VER system. The main starting point of the study was to gain more insight into the practical aspects of VER. One important question is what form a VER system for the Netherlands should have to take. Also, an investigation was made into the activities which are necessary to introduce a VER system as well as the time, manpower and money these activities entail

  15. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  16. 78 FR 26384 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2013-05-06

    ... E. Freemont Lake Road, Pinedale, WY 82941 The applicant requests the renewal of an existing permit... the permit you are interested in by number (e.g., Permit No. TE-106387). Email: [email protected] . Please refer to the respective permit number (e.g., Permit No. TE-106387) in the subject line of the...

  17. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) will provide permanent disposal for approximately 43 Mgal of radioactive liquid waste currently being stored in underground tanks on the Hanford Site. The first step in permanent disposal is accomplished by solidifying the low-level liquid waste with cementitious dry materials. The resulting grout is cast within underground vaults. This report on the GTF contains information on the following: Hanford Site Maps, road evaluation for the grout treatment facility, Department of Ecology certificate of non-designation for centralia fly ash, double-shell tank waste compositional modeling, laboratory analysis reports for double-shell tank waste, stored in tanks 241-AN-103, 241-AN-106, and 241-AW-101, grout vault heat transfer results for M-106 grout formulation, test results for extraction procedure toxicity testing, test results for toxicity testing of double-shell tank grout, pilot-scale grout production test with a simulated low-level waste, characterization of simulated low-level waste grout produced in a pilot-scale test, description of the procedure for sampling nonaging waste storage tanks, description of laboratory procedures, grout campaign waste composition verification, variability in properties of grouted phosphate/sulfate N-reactor waste, engineering drawings, description of operating procedures, equipment list--transportable grout equipment, grout treatment facility--tank integrity assessment plan, long-term effects of waste solutions on concrete and reinforcing steel, vendor information, grout disposal facilities construction quality assurance plan, and flexible membrane liner/waste compatibility test results

  18. Experimental absorbable stent permits airway remodeling.

    Science.gov (United States)

    Liu, Kuo-Sheng; Liu, Yun-Hen; Peng, Yi-Jie; Liu, Shih-Jung

    2011-02-01

    Despite metallic and silicone stents being effective in treating various airway lesions, many concerns still remain. A bioresorbable stent that scaffolds the airway lumen and dissolves after the remodeling process is completed has advantages over metallic and silicone stents. We designed and fabricated a new mesh-type bioresorbable stent with a backbone of polycaprolactone (PCL), and evaluated its safety and biocompatibility in a rabbit trachea model. The PCL stent was fabricated by a laboratory-made microinjection molding machine. In vitro mechanical strength of the PCL stents was tested and compared to that of commercial silicone stents. The bioresorbable stents were surgically implanted into the cervical trachea of New Zealand white rabbits (n=6). Animals received bronchoscopic examination at 1, 2, 4, 8, and 12 weeks after surgery. Histological examination was completed to evaluate the biocompatibility of the stents. No animals died during the period of study. Distal stent migration was noted in 1 rabbit. In-stent secretion accumulation was found in 2 rabbits. Histological examination showed intact ciliated epithelium and marked leukocyte infiltration in the submucosa of the stented area at 10 and 28 weeks. Stent degradation was minimal, and the mechanical strength was well preserved at the end of 33 weeks. These preliminary findings showed good safety and biocompatibility of the new PCL stent when used in the airway remodeling. PCL could be a promising bioresorbable material for stent design if prolonged degradation time is required. Copyright © 2011 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  19. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  20. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  1. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Operating Permit (Permit Number: V-UO-000979-2017.00), statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Andeavor Walker Hollow Compressor Station.

  2. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received...

  3. 77 FR 38834 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-06-29

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received...

  4. 78 FR 59728 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-27

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Foundation (NSF) is required to publish a notice of permit applications received to conduct activities...

  5. Permitted and forbidden sets in symmetric threshold-linear networks.

    Science.gov (United States)

    Hahnloser, Richard H R; Seung, H Sebastian; Slotine, Jean-Jacques

    2003-03-01

    The richness and complexity of recurrent cortical circuits is an inexhaustible source of inspiration for thinking about high-level biological computation. In past theoretical studies, constraints on the synaptic connection patterns of threshold-linear networks were found that guaranteed bounded network dynamics, convergence to attractive fixed points, and multistability, all fundamental aspects of cortical information processing. However, these conditions were only sufficient, and it remained unclear which were the minimal (necessary) conditions for convergence and multistability. We show that symmetric threshold-linear networks converge to a set of attractive fixed points if and only if the network matrix is copositive. Furthermore, the set of attractive fixed points is nonconnected (the network is multiattractive) if and only if the network matrix is not positive semidefinite. There are permitted sets of neurons that can be coactive at a stable steady state and forbidden sets that cannot. Permitted sets are clustered in the sense that subsets of permitted sets are permitted and supersets of forbidden sets are forbidden. By viewing permitted sets as memories stored in the synaptic connections, we provide a formulation of long-term memory that is more general than the traditional perspective of fixed-point attractor networks. There is a close correspondence between threshold-linear networks and networks defined by the generalized Lotka-Volterra equations.

  6. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  7. 25 CFR 166.219 - How do I acquire a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire a permit through negotiation? 166.219 Section 166.219 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.219 How do I acquire a permit through negotiation? (a) Permits may be negotiated and granted by th...

  8. Tradeable CO2 emission permits. A quantitative analysis of a TEP system between Annex I countries

    International Nuclear Information System (INIS)

    Koutstaal, P.R.; Kram, T.; Van Rooijen, S.N.M.

    1997-11-01

    Tradeable emission permits can be a cost-effective way to achieve emission reductions between countries or firms. In this study, the role of trading CO 2 emission permits between the Annex I countries of the FCCC is analysed. It is assumed that only countries are allowed to trade and that there is a perfect market without transaction costs and strategic behaviour. For several cases, the consequences for abatement costs, before and after trade, the volume of permits traded and emissions per capita are studied. Moreover, the gains from trade are determined. This study was undertaken before the Kyoto conference, therefore as a starting point for the different cases it was assumed that all countries should reduce their emissions with 10%. The cases studied are: a flat rate of 10% for each country; the differentiated EU distribution combined with a 10% reduction for the other OECD countries; and the so-called Triptych approach applied to all OECD countries. Two trading systems are considered, one covering only the OECD countries and one which also covers Middle and Eastern European countries (in a simplified way). Furthermore, two extreme cases are studied for the OECD trading scheme: equal costs (after trade) per unit of GNP and equal emission per capita (before trade). Tradeable emission permits will considerably reduce total costs compared with no trade by about 50%. The EU will considerably reduce total costs compared with no trade by about 50%. The EU will be a net exporter of permits in an OECD trading scheme (without Middle and Eastern Europe), mainly because the low costs possibilities for reduction of CO 2 emissions in Germany and the United Kingdom. 13 refs

  9. Heterogeneity of demand responses in modelling the distributional consequences of tradable carbon permits in the road transport sector

    International Nuclear Information System (INIS)

    Wadud, Zia; Noland, Robert B.; Graham, Daniel J.

    2007-01-01

    Personal road transport sector is one of the largest and fastest growing sources of CO 2 emissions. This paper investigates a tradable permit policy for mitigating carbon emissions from personal road transport and discusses various issues of permit allocation. As tradable permits will effectively raise the price of fuel, the policy has important distributional implications. The distribution of burden depends on permit allocation strategies and on the consumer response to an increase in price. The behavioural response may vary among different segments of the population depending on their travel needs, which in turn are contingent upon their income, location of residence and other factors. Consumer Expenditure Survey micro dataset from 1997 to 2002 has been used to econometrically model the possible variation of price elasticity for different socio-economic groups in the USA. Results indicate that the response of gasoline demand to a change in price does depend on income level or location of the household. Distributional impacts of the tradable permit policy are then evaluated using the micro dataset for year 2002. In this regard, different permit allocation schemes are considered in the analysis. Impacts on households owning a vehicle and households with no vehicles have been evaluated as well

  10. Allocation of emission permits with leakage through capital markets

    International Nuclear Information System (INIS)

    Maestad, Ottar

    2007-01-01

    This paper analyses how tradable emission permits should be allocated to firms when capital is internationally mobile. When international environmental problems are attempted solved through uncoordinated policies between countries, it might be desirable for the home country to issue free emission permits in proportion to the use of capital in order to prevent leakage through international capital movements. The desirability of free emission permits will however be reduced if capital also can be employed in a domestic non-polluting sector. In this case, it may even be optimal to tax the use of capital in the polluting sector. It is also shown that it is always optimal to subsidise the use of capital in the polluting sector if the use of labour is taxed at an optimal rate. Finally, leakage does not affect the optimal domestic emission limit as long as appropriate capital subsidies and labour taxes are implementeed. (author)

  11. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  12. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  13. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  14. 76 FR 50246 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-08-12

    ... species in the wild. Permit Application Number: TE212427. Applicant: Ecology and Environment, Inc... wild. Permit Application Number: TE48835A. Applicant: Applied Science & Technology, Inc., Brighton, MI...

  15. Emission Permits trade between the Nordic and Baltic Countries

    Energy Technology Data Exchange (ETDEWEB)

    Alm, Leif Kristian

    2000-05-01

    A bottom-up technology oriented model of the energy systems in the Nordic and Baltic countries have been constructed and used for analysing an optimal set of energy and emission trading within the region. The model used is MARKAL, which has been developed within the IEA-ETSAP. The analyses are based on national emission levels agreed on in the Kyoto protocol (and the following burden sharing negotiations within the European Union), and with an additional strengthening after 2010. Only energy related CO{sub 2} emissions are explicitly considered. Nuclear power in Sweden is assumed to be phased out. The results show that especially Norway and Sweden have large abatement costs when acting alone, whale the Baltic countries will probably not need to take domestic actions due to the Kyoto protocol if they act alone, as the restructuring of their economies in the beginning of the 1990ties cut emissions (and their economies) dramatically. It is shown that emission trading among the Nordic and Baltic countries can reduce abatement costs among the Nordic countries significantly, possibly down to a level equivalent to a world market (Annex I) permit price. Extending the Nordic common electricity market to Balticum will have minor influence on overall energy system costs. There is no pronounced direction for net electricity flow between the Nordic and Baltic countries. High marginal costs during peak hours in Balticum indicate that imports of Nordic hydro power during peak-hours could be a cost-effective option. This possibility could be implemented with a subsea AC/DC connection between Sweden and Latvia. It is politically viable to develop more hydropower in Norway, this country will be the major electricity exporter in the region, while Sweden will be the main importer. Changing scenario assumptions, i.e. no more Norwegian hydropower, but life extension of Swedish nuclear power, could change this picture. (author)

  16. 77 FR 6816 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-02-09

    ... notification covers activities to be conducted by the applicant over a 5-year period. Applicant: Bar H Bar Land...: Bar H Bar Land & Cattle Company, Houston, TX; PRT-63872A The applicant requests a permit authorizing... covers activities to be conducted by the applicant over a 5-year period. Applicant: Diamond J Game Ranch...

  17. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  18. 7 CFR 319.41-2 - Application for permits.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION... importation of any of the articles specified in § 319.41-1(b), shall first make application to the Plant Protection and Quarantine Programs for a permit, stating in the application the name and address of the...

  19. 7 CFR 319.55-2 - Application for permit.

    Science.gov (United States)

    2010-01-01

    ... rice hulls from any country, may be made to the Plant Protection and Quarantine Programs, indicating in... 7 Agriculture 5 2010-01-01 2010-01-01 false Application for permit. 319.55-2 Section 319.55-2 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION...

  20. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ... a Federal permit is issued that allows such activities. The ESA law requires that we invite public... laws and regulations. We will not consider or include in our administrative record comments we receive....) held in zoos in the United States to the Department of Anthropology, University of Cambridge, Cambridge...

  1. 75 FR 82409 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-30

    ... reissuance of their permit for scientific research with two captive-born giant pandas (Ailuropoda melanoleuca... provisions of the USFWS Giant Panda Policy. The proposed research will cover all aspects of behavior, reproductive physiology, genetics, nutrition, and animal health and is a continuation of activities currently...

  2. 19 CFR 12.7 - Permits required for importation.

    Science.gov (United States)

    2010-04-01

    ... Department of Health and Human Services under the said act require that each container of milk or cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  3. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  4. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  5. 77 FR 2037 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-01-13

    ... filmmaker hopes to document the behavior of marine animals in the presence of a gray whale carcass. Filming... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No. 17032 AGENCY: National Marine Fisheries Service (NMFS), National...

  6. 77 FR 24470 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-04-24

    ... behavior of marine animals in the presence of a gray whale carcass. Filming will occur between April and... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No. 17032 AGENCY: National Marine Fisheries Service (NMFS), National...

  7. 15 CFR 922.104 - Permit procedures and criteria.

    Science.gov (United States)

    2010-01-01

    ... management decisionmaking; (2) Intended to further the educational value of the Sanctuary and thereby enhance... RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Fagatele Bay National Marine Sanctuary... to which the conduct of any permitted activity may diminish or enhance the value of the Sanctuary as...

  8. 78 FR 42540 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-07-16

    ... to the disadvantage of the listed species, and that the terms and conditions of the permit were... UNIVERSITY 207948 3/4/2013 12/31/2017 WESTERN ECOSYSTEMS TECHNOLOGY, INC 050706 10/1/2012 12/31/2015 WESTERN...

  9. 75 FR 11193 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-03-10

    ...] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... employees and their designated agents to conduct enhancement of survival activities for a plant that was recently added to the List of Endangered and Threatened Plants (Phyllostegia hispida). The Endangered...

  10. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  11. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  12. 77 FR 298 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2012-01-04

    ... fruit bat (Pteropus rodricensis) Applicant: Disney's Animal Kingdom, Lake Buena Vista, FL; PRT-812907... applicant over a 5-year period. Applicant: Feld Entertainment Inc., Vienna, VA; PRT-702230 The applicant... Anderson, Hastings, NE; PRT-59366A The applicant requests a permit to import a sport-hunted trophy of one...

  13. 77 FR 17494 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-26

    ... be conducted by the applicant over a 5-year period. Applicant: Feld Entertainment, Inc., Vienna, VA... import of any potential progeny born while overseas. The permit numbers and animals are: Tigers: Julie... sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive herd...

  14. 76 FR 33337 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-06-08

    ...: Lasthenia conjugens (Contra Costa goldfields), Arabis mcdonaldiana (McDonald's rock-cress), Calystegia... of receipt of permit applications; request for comment. SUMMARY: We, the U.S. Fish and Wildlife... received on or before July 8, 2011. ADDRESSES: Written data or comments should be submitted to the U.S...

  15. 76 FR 39888 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-07-07

    ... (Sonoma alopecurus); Amsinckia grandiflora (large-flowered fiddleneck); Arabis mcdonaldiana (McDonald's... of receipt of permit applications; request for comment. SUMMARY: We, the U.S. Fish and Wildlife... received on or before August 8, 2011. ADDRESSES: Written data or comments should be submitted to the U.S...

  16. 18 CFR 415.32 - Permitted uses generally.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Permitted uses generally. 415.32 Section 415.32 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION... riding trails. (4) Uses such as lawns, gardens, parking areas and play areas. (b) Within the flood fringe...

  17. 76 FR 60933 - Antarctic Conservation Act Permit Applications

    Science.gov (United States)

    2011-09-30

    ... NATIONAL SCIENCE FOUNDATION Antarctic Conservation Act Permit Applications AGENCY: National... Conservation Act of 1978. DATES: Interested parties are invited to submit written data, comments, or views with... Regulation for conduct of a flight from South America, over the South Pole, landing at Teniente Marsh Base...

  18. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  19. 50 CFR 16.22 - Injurious wildlife permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Injurious wildlife permits. 16.22 Section 16.22 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND...

  20. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    International Nuclear Information System (INIS)

    Leiby, P.; Rubin, J.

    2001-01-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs

  1. Starlight excitation of permitted lines in the Orion Nebula

    International Nuclear Information System (INIS)

    Grandi, S.A.

    1975-01-01

    From an idealized model of the Orion Nebula and from an analysis of line ratios it is shown that direct starlight excitation of the permitted O I line dominates over recombination and Lyman line fluorescence. The line strengths predicted by this mechanism agree reasonably well with those observed in the Orion Nebula. The application of direct starlight excitation to other ions is also discussed

  2. 76 FR 15992 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-03-22

    ...-106816 Applicant: Douglas High School, Douglas, Arizona. Applicant requests a new permit for holding a... (Gila pupurea) at Douglas High School, to establish, reestablish, or augment populations consistent with... salamander (Eurycea sosorum), San Marco salamander (Eurycea nana), Texas blind salamander (Typhlomolge...

  3. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  4. 40 CFR 146.9 - Criteria for establishing permitting priorities.

    Science.gov (United States)

    2010-07-01

    ....9 Criteria for establishing permitting priorities. In determining priorities for setting times for... priorities. 146.9 Section 146.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... (a), (c), (g) or § 144.22(f), the Director shall base these priorities upon consideration of the...

  5. 78 FR 31973 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-05-28

    ... O'odham Nation, Sells, Arizona. Applicant requests an amendment to a current permit for research and... (Herpailurus yagouaroundi), and ocelot (Leopardus pardalis) within Pima County, Tohono O'odham Nation, Arizona... and Wildlife Service, P.O. Box 1306, Room 6034, Albuquerque, NM 87103 at 505-248-6920. Please refer to...

  6. 40 CFR 266.102 - Permit standards for burners.

    Science.gov (United States)

    2010-07-01

    ... or industrial furnace downstream of the combustion zone and prior to release of stack gases to the... MANAGEMENT FACILITIES Hazardous Waste Burned in Boilers and Industrial Furnaces § 266.102 Permit standards for burners. (a) Applicability—(1) General. Owners and operators of boilers and industrial furnaces...

  7. 50 CFR 21.23 - Scientific collecting permits.

    Science.gov (United States)

    2010-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... possessed under authority of a scientific collecting permit must be donated and transferred to the public...

  8. 50 CFR 21.12 - General exceptions to permit requirements.

    Science.gov (United States)

    2010-10-01

    ..., as amended (40 Stat. 755; 16 U.S.C. 703-(711), may, without a permit, take or otherwise acquire, hold in custody, transport, and dispose of migratory birds or their parts, nests, or eggs as necessary in performing their official duties. (b) Employees of certain public and private institutions: (b)(1) State game...

  9. 43 CFR 13.2 - Application for permit.

    Science.gov (United States)

    2010-10-01

    ..., Education, and Welfare under the Randolph-Sheppard Vending Stand Act may apply for permits to establish and maintain vending facilities, including both vending stands and machines, to be operated by blind persons... Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND...

  10. 76 FR 21423 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-04-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0063] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... application is for two 30-inch segments, segments 3 and 4, of the TPL 330 natural gas pipeline located in St...

  11. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  12. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0112] Pipeline Safety: Requests for Special Permit AGENCY: Pipeline and Hazardous Materials... BreitBurn Energy Company LP, two natural gas pipeline operators, seeking relief from compliance with...

  13. 78 FR 65429 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0041] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials...-0041 Williams Gas Pipeline 49 CFR 192.150........ To authorize the extension Company, LLC (WGP). of a...

  14. 76 FR 14650 - Endangered Species; Permit No. 13330-01

    Science.gov (United States)

    2011-03-17

    ... Atmospheric Administration (NOAA), Commerce. ACTION: Notice; receipt of modification request. SUMMARY: Notice is hereby given the following applicant has applied in due form for a modification to a permit... Smart Position Only Transmitting (SPOT) tags. Sampling also includes a small genetic tissue fin clip and...

  15. 77 FR 64121 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-10-18

    ... Management Authority, U.S. Fish and Wildlife Service, 4401 North Fairfax Drive, Room 212, Arlington, VA 22203... identifying information--may be made publicly available at any time. While you can ask us in your comment to... period to allow the public the opportunity to comment on a request for a permit to export the sport...

  16. 75 FR 38117 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-01

    ..., 2010. ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and Wildlife Service, 4401... available at any time. While you can ask us in your comment to withhold your personal identifying... Spidle, Bellville, TX; PRT-10399A The applicant requests a permit to import the sport-hunted trophy of...

  17. 75 FR 54909 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2010-09-09

    ... comments on or before October 12, 2010. ADDRESSES: Brenda Tapia, Division of Management Authority, U.S...--may be made publicly available at any time. While you can ask us in your comment to withhold your... applicant requests a permit to re-export the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  18. 50 CFR 622.4 - Permits and fees.

    Science.gov (United States)

    2010-10-01

    ... organization. (C) Information concerning vessels, harvesting gear/methods, or fishing areas, as specified on... inspection; (3) Discusses possible hazards to safe navigation or hindrance to vessel traffic, traditional... upon the permitted vessel and/or captain, as appropriate, being included in an active survey frame for...

  19. 75 FR 55848 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-09-14

    ... the special permit segment and to allow the public to review additional documents added to the docket... period of 30 days from the date of publication of this notice in relation to the Federal Register Notice... allows the public to enter comments on any Federal Register notice issued by any agency. Fax: 1-202-493...

  20. 78 FR 4162 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-18

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and..., Greer, SC; PRT-89822A The applicant requests a permit to import a sport-hunted trophy of two male... import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive...

  1. 75 FR 52971 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-08-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a... applicant requests a permit to re-export a sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  2. 40 CFR 144.41 - Minor modifications of permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Minor modifications of permits. 144.41 Section 144.41 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS... responsibility, coverage, and liability between the current and new permittees has been submitted to the Director...

  3. 40 CFR 122.63 - Minor modifications of permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Minor modifications of permits. 122.63..., coverage, and liability between the current and new permittees has been submitted to the Director. (e)(1...) Incorporate changes to the terms of a CAFO's nutrient management plan that have been revised in accordance...

  4. 40 CFR 258.4 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Research, development, and...) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS General § 258.4 Research, development, and... State may issue a research, development, and demonstration permit for a new MSWLF unit, existing MSWLF...

  5. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    NARCIS (Netherlands)

    Rehdanz, K.; Tol, R.S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission

  6. 30 CFR 773.6 - Public participation in permit processing.

    Science.gov (United States)

    2010-07-01

    ... consecutive weeks. A copy of the advertisement as it will appear in the newspaper shall be submitted to the regulatory authority. The advertisement shall contain, at a minimum, the following: (i) The name and business... permit under § 774.15, shall place an advertisement in a local newspaper of general circulation in the...

  7. Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-12-19

    Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit presentation from the WPTO FY14-FY16 Peer Review. The toolkit is aimed at regulatory agencies, consultants, project developers, the public, and any other party interested in learning more about the hydropower regulatory process.

  8. 75 FR 59711 - Audit Program for Texas Flexible Permit Holders

    Science.gov (United States)

    2010-09-28

    ... flexible permits. This Final Notice makes modifications to the Audit Program based on comments received... penalties resulting from noncompliance uncovered by the Audit. ADDRESSES: Docket: EPA has established a... INFORMATION CONTACT: To submit executed Audit Agreements or for more information on the Audit Program for...

  9. 77 FR 25733 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2012-05-01

    .... ADDRESSES: Documents and other information submitted with the applications are available for review, subject... information from public review, we cannot guarantee that we will be able to do so. Permit Application Number..., capture, band, draw blood and conduct laparotomies on yellow-shouldered blackbirds (Agelaius xanthomus) in...

  10. 77 FR 51042 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-08-23

    ... take (survey by pursuit) the Quino checkerspot butterfly (Euphydryas editha quino) in conjunction with... requests a permit to take (survey by pursuit) the Quino checkerspot butterfly (Euphydryas editha quino) in... Island bush-mallow) Monardella viminea (=M. linoides subsp. v.) (willowy monardella) Orcuttia californica...

  11. 40 CFR 221.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... of the proposed dumping on the marine environment, navigation, living and non-living marine resource... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Applications for permits. 221.1 Section 221.1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING...

  12. 77 FR 29450 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-05-17

    ............ Conference of 49 CFR To modify the Radiation 172.203(d); special permit add Control Part 172, 49 CFR Part 172..., KY. the list of regulations exempted in paragraph 4. 11406-M......... Conference of 49 CFR Part To... mode of Berlin 173.345; transportation Packaging 173.346; (cargo vessel.) (Former 173.359; Grantee All...

  13. 76 FR 27307 - Marine Mammals; Photography Permit Application No. 16360

    Science.gov (United States)

    2011-05-11

    ... Mammals; Photography Permit Application No. 16360 AGENCY: National Marine Fisheries Service (NMFS... commercial/educational photography of cetaceans off Hawaii. DATES: Written, telefaxed, or e-mail comments... CFR part 216). Section 104(c)(6) provides for photography for educational or commercial purposes...

  14. 77 FR 64843 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-10-23

    ... modify the Industrial 173.150(b); special permit to Products dba 173.222(c); authorize the Invensys 173... changed from package to packaging would allow the containers to be shipped back to the manufacturer for... Base, IL. 176.84(c)(2); ammunition on and 176.136. United States Navy Container Ships. (mode 3) DENIED...

  15. 76 FR 14985 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-03-18

    ... the applicant over a 5-year period. Applicant: Rosamond Gifford Zoo at Burnet Park, Syracuse, NY; PRT- 28295A The applicant requests a permit to re-import two captive born female Asian elephants (Elephas maximus) and one captive born male Asian elephant from African Lion Safari and Game Farm, Ontario, Canada...

  16. 78 FR 9725 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-02-11

    ...-66682A The applicant requests a permit to re-export a captive-born male Asian elephant (Elephas maximus... species (Mescocapromys species), African elephant (Loxodonta Africana), Asian elephant (Elephas maximus... covers activities to be conducted by the applicant over a 5-year period Applicant: Hawthorn Corporation...

  17. 75 FR 28650 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-21

    ... enhancement of the species. This notification covers activities to be conducted by the applicant over a 5-year... applicant requests permits to re-export (12311A) and re-import (128999) one male captive-born Asian elephant... education. This notification covers activities to be conducted by the applicant over a 3-year period...

  18. 78 FR 25296 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-04-30

    ... requests a permit to re-import one live Asian elephant (Elephas maximus) born in captivity from Calgary Zoo... applicant over a 5-year period. Families Bovidae Cebidae Camelidae Cathartidae Cercopithecidae Cervidae... notification covers activities to be conducted by the applicant over a 5-year period. Families Bovidae Canidae...

  19. 75 FR 75491 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-03

    ... Species Applicant: International Elephant Foundation, Fort Worth, TX; PRT- 15923A On October 25, 2010, we... applicant requests a permit to import biological specimens of Asian elephant (Elephus maximus) from wild... scientific research. This notification covers activities to be conducted by the applicant over a 5-year...

  20. 77 FR 26777 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-05-07

    ... not operate to the disadvantage of the endangered species, and (3) The granted permit would be..., 2012. 64654A Double Springs 77 FR 6816; March 14, 2012. Partnership Ltd. February 9, 2012. 64656A Double Springs 77 FR 6816; March 14, 2012. Partnership Ltd. February 9, 2012. 64723A Larry Friesenhahn...

  1. Chaparral Commerce Center Proposed Tribal Minor NSR Permit Application

    Science.gov (United States)

    Tribal Minor New Source Review (NSR) Permit application for the two emergency diesel-fired generators (1,500 kW each) to be installed at the Chaparral Commerce Center in the Salt River Pima-Maricopa Indian Community (SRPMIC) in Scottsdale, Arizona.

  2. 75 FR 34445 - Audit Program for Texas Flexible Permit Holders

    Science.gov (United States)

    2010-06-17

    ... flexible permit. The third-party auditor would identify for each emission unit regulated under the source's... Technology, State Implementation Plan citation). The auditor will also need to review and assess the adequacy... unit-specific emission limitations. Where deficiencies exist, the auditor will provide recommendations...

  3. 78 FR 30327 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2013-05-22

    .... Applicant Federal Register notice Permit issuance date Endangered Species 65816A Lewis Henderson........ 77... FR 24510; April 24, June 1, 2012. 2012. 69106A Lewis Henderson........ 77 FR 24510; April 24, June 1... 11, 2012. 2012. 213382 Virginia Safari Park & 77 FR 26779; May 7, July 21, 2012. Preservation Center...

  4. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  5. 32 CFR 767.7 - Conditions of permits.

    Science.gov (United States)

    2010-07-01

    ... GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE JURISDICATION OF THE... to submit to NHC a working and diving log listing days spent in field research, activities pursued... protect all sensitive information regarding the location and character of the wreck site that could...

  6. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  7. On the use of exchange rates as trading rules in a bilateral system of transferable discharge permits

    International Nuclear Information System (INIS)

    Rodriguez, F.

    2000-01-01

    The use of a system of transferable discharge permits to control the harmful effects of non-uniformly mixed pollutants requires the application of trading rules in order to prevent permit trading among sources from violating environmental standards. The elements and properties of bilateral trading rules can be analyzed more easily once formulated as exchange rates, which would convert, in a cost-effective way, the emission right potentially given up by the seller into an offsetting emission right acquired by the buyer. In this article, a new expression for such exchange rates is proposed and then analyzed to infer some unexplored properties of the system. 8 refs

  8. The use of permit markets for incorporating source location. The case of acid rain in Europe

    International Nuclear Information System (INIS)

    Steiner, U.; Tinggaard Svendsen, G.

    1997-01-01

    The paper shows that cost-effective involvement of the source location involves utmost difficulty in practice. Based on the RAINS model, it is recommended that source location should be ignored in a European market for SO 2 , as is the case in the US Acid Rain Program. The RAINS-model predicts a cost-saving of 37 percent but an average loss of 2 percent in ecological protection. To overcome this reduction in protection, we recommend that some of the large cost-savings should be reallocated in further overall reduction and that the countries suffering the most from introducing the permit-market should be compensated by receiving extra permits in the initial distribution. (au)

  9. Modeling and Computation of Transboundary Industrial Pollution with Emission Permits Trading by Stochastic Differential Game.

    Science.gov (United States)

    Chang, Shuhua; Wang, Xinyu; Wang, Zheng

    2015-01-01

    Transboundary industrial pollution requires international actions to control its formation and effects. In this paper, we present a stochastic differential game to model the transboundary industrial pollution problems with emission permits trading. More generally, the process of emission permits price is assumed to be stochastic and to follow a geometric Brownian motion (GBM). We make use of stochastic optimal control theory to derive the system of Hamilton-Jacobi-Bellman (HJB) equations satisfied by the value functions for the cooperative and the noncooperative games, respectively, and then propose a so-called fitted finite volume method to solve it. The efficiency and the usefulness of this method are illustrated by the numerical experiments. The two regions' cooperative and noncooperative optimal emission paths, which maximize the regions' discounted streams of the net revenues, together with the value functions, are obtained. Additionally, we can also obtain the threshold conditions for the two regions to decide whether they cooperate or not in different cases. The effects of parameters in the established model on the results have been also examined. All the results demonstrate that the stochastic emission permits prices can motivate the players to make more flexible strategic decisions in the games.

  10. Modeling and Computation of Transboundary Industrial Pollution with Emission Permits Trading by Stochastic Differential Game.

    Directory of Open Access Journals (Sweden)

    Shuhua Chang

    Full Text Available Transboundary industrial pollution requires international actions to control its formation and effects. In this paper, we present a stochastic differential game to model the transboundary industrial pollution problems with emission permits trading. More generally, the process of emission permits price is assumed to be stochastic and to follow a geometric Brownian motion (GBM. We make use of stochastic optimal control theory to derive the system of Hamilton-Jacobi-Bellman (HJB equations satisfied by the value functions for the cooperative and the noncooperative games, respectively, and then propose a so-called fitted finite volume method to solve it. The efficiency and the usefulness of this method are illustrated by the numerical experiments. The two regions' cooperative and noncooperative optimal emission paths, which maximize the regions' discounted streams of the net revenues, together with the value functions, are obtained. Additionally, we can also obtain the threshold conditions for the two regions to decide whether they cooperate or not in different cases. The effects of parameters in the established model on the results have been also examined. All the results demonstrate that the stochastic emission permits prices can motivate the players to make more flexible strategic decisions in the games.

  11. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  12. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    International Nuclear Information System (INIS)

    Rehdanz, Katrin; Tol, Richard S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission reduction target and export more permits. This in turn would not only reduce the costs for both countries as less emissions have to be reduced, but it also lowers the environmental benefits of the importing country. One price instrument (tariff) and two quantity instruments (discount, quota) to prevent the exporting country from issuing more permits are examined. Each instrument restricts trade and alters the terms of trade for the two countries. The importing country (and regulator) prefers an import tariff and an import quota to a carbon discount. If the exporting country releases additional permits, the importing country should not try to keep total emissions constant, as that would be ineffective and maybe even counterproductive. Instead, the importing country should aim to keep the total import constant; this would impose costs on the exporting country that are independent of the policy instrument; an import quota would be the cheapest option for the importing country. An import quota would also stress the idea of supplementary of the flexible mechanism as it increases the share of emissions reduced domestically. Compliance and liability issues constrain the market further. However, both the importing and the exporting country would prefer that the permit seller is liable in case of non-compliance, as sellers' liability would less constrain the market

  13. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  14. 30 CFR 280.27 - When may MMS cancel my permit?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When may MMS cancel my permit? 280.27 Section... Part Interrupted Activities § 280.27 When may MMS cancel my permit? The RD may cancel a permit at any time. (a) If we cancel your permit, the RD will advise you by certified or registered mail 30 days...

  15. 50 CFR 697.24 - Exempted waters for Maine State American lobster permits.

    Science.gov (United States)

    2010-10-01

    ... lobster permits. 697.24 Section 697.24 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... lobster permits. A person or vessel holding a valid permit or license issued by the State of Maine that lawfully permits that person to engage in commercial fishing for American lobster may, with the approval of...

  16. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2012-09-25

    ... Objection to State Operating Permit for Cheyenne Light, Fuel & Power, Wygen II Power Plant AGENCY... to Cheyenne Light, Fuel & Power (CLF&P) for their Wygen II power plant (Wygen II). Pursuant to... final Order, the Petition, and other supporting information. You may view the hard copies Monday through...

  17. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  18. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Science.gov (United States)

    2012-04-23

    ... Objection to State Operating Permits for Consolidated Environmental Management, Inc.--Nucor Steel Louisiana... Management, Inc.--Nucor Steel Louisiana (``Nucor'') in Saint James Parish, Louisiana. Pursuant to sections... Environmental Management, Inc.--Nucor Steel Louisiana (``Nucor'') is available electronically at: http://www.epa...

  19. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  20. 75 FR 19968 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2010-04-16

    ... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...

  1. 25 CFR 166.220 - What are the basic steps for acquiring a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What are the basic steps for acquiring a permit through negotiation? 166.220 Section 166.220 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.220 What are the basic steps for acquiring a permit through negotiation? The...

  2. Should the regulator allow citizens to participate in tradable permits markets?

    International Nuclear Information System (INIS)

    Rousse, Olivier

    2008-01-01

    Since the seminal paper written by Weitzman (1974), the 'prices vs. quantities' debate regarding choice of policy instrument under imperfect information and uncertainty has been an ongoing concern for economists, especially in the field of the environment. In this debate, several papers have recommended that the regulator allow pollution victims (citizens) to participate in tradable permits markets. According to this literature, when pollution victims purchase and withhold (i.e. destroy) emission rights from polluting firms, this means that the overall quota is not efficient and that welfare gains will be realised. In this paper, we present further theoretical results showing that citizen participation in tradable quotas markets may become welfare decreasing. Indeed, citizens can aggravate the first error made by the regulator if they are also under uncertainty about the marginal benefit curve or if they exhibit strong enough risk aversion. Therefore, we recommend that the regulator limit citizen participation to a certain percentage of permits. In doing so, we extend the 'prices versus quantities' debate to simultaneous uncertainty and risk aversion by showing that a marketable permits system offers the regulator an opportunity to control the negative effects of agents' (citizens' and firms') risk aversion on welfare. (author)

  3. CERN CERTIFICATE REQUIRED FOR AN APPLICATION FOR A FRENCH RESIDENCE PERMIT ISSUED BY A PREFECTURE

    CERN Multimedia

    Relations with the Host States Service

    2001-01-01

    All non-French nationals who reside in France for more than three consecutive months or who, in the case of intermittent periods of residence, are effectively present in France for more than three months in any six-month period must obtain a residence or stay permit (titre de séjour). If members of the CERN personnel and members of their families fulfil those conditions inter alia, they normally receive a legitimation document, which is valid as a residence or stay permit, from the French Ministry of Foreign Affairs (Carte spéciale FI or AT, Carte d'assimilé à un membre de mission diplomatique). However, members of the personnel with permanent resident status (résident permanent) are not, by virtue of that status, entitled to a legitimation document and must obtain a residence permit issued by a Prefecture. For the latter purpose, with the agreement of the Prefecture de l'Ain, CERN (i.e. the Personnel Records Office, Human Resources Division, office 33/1-...

  4. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  5. 75 FR 81139 - Migratory Bird Permits; States Delegated Falconry Permitting Authority; Technical Corrections to...

    Science.gov (United States)

    2010-12-27

    ... information in this text pertains to the possession of raptors by Apprentice Falconers, and we believe this... used to document take of raptors from the wild for use in falconry and to document transfers of raptors... impacts. Raptor populations. This rule will not change the effects of falconry on raptor populations. We...

  6. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  7. Can a carbon permit system reduce Spanish unemployment?

    International Nuclear Information System (INIS)

    Faehn, Taran; Gomez-Plana, Antonio G.; Kverndokk, Snorre

    2009-01-01

    This paper analyses the impact of carbon policy on unemployment in Spain and whether recycling the public revenues earned from permit auctions can alleviate this problem. While Spain's deviation from the European Union's intermediate emission goals is more serious than most other member countries' unemployment in Spain is also well above average for the European Union. We use a computable general equilibrium model that includes unemployment in the markets for unskilled and skilled labour. We find that introducing carbon permits does not aggravate Spanish unemployment. In fact, if supplied with revenue recycling schemes, unemployment rates may actually fall. Contrary to other European studies, we find that the best option is to reduce payroll taxes on relatively skilled types of labour. This reform is successful in both increasing labour demand and dampening the supply response to rising wages. However, while all of the recycling schemes generate dividends in terms of aggregate welfare, none entirely offsets the abatement costs. (author)

  8. Action for declaration of annulment of reactor construction permit dismissed

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The Higher Administrative Court of Rheinland Pfalz has confirmed two decisions by the Koblenz Administrative Court dismissing an actions to declare the annulment of the partial construction permit issued for the Muelheim-Kaerlich reactor. Appeal was not admitted. The plaintiffs, who are under age and were represented by their father, are permanently resident in Schleswig-Holstein, at about 470 km from the site and have a further residence in Mainz, about 60 km away from the site. They plead to have a legitimate interest in the declaration of nullity on the grounds of the uncertainty created in legal matters by the delivery of the permit and its being unconstitutional as well as for ideological and religious reasons. The ruling deals also with the importance of the distance from the site of a nuclear reactor, which is considered to be such as to exclude the 'necessary spatial relation'. (orig./HP) [de

  9. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  10. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  11. Challenges to IPPC-B permitting at LGU in Macedonia

    International Nuclear Information System (INIS)

    Nikolov, Marjan

    2006-01-01

    The debate will soon turn to discussion of the arrangements between the environmental protection administration (both central and local), the LGU and ZELS and businesses in order to implement the Law on environment. Of special importance will be development of environment for IPPC-B permitting at the LGU including all stakeholders. The Ministry of Environment and Physical Planning-MEPP must clarify the interface between the responsibilities of the Environmental Protection Administration and those of the LGU.

  12. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  13. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  14. 616 Nonradioactive Dangerous Waste Storage Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this storage unit, including the Part A included with this document, is provided at the beginning of the Part A Section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings. The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application (Revision 0) was submitted to the Washington State Department of Ecology and the US Environmental Protection Agency on July 31, 1989. Revision 1, addressing Washington State Department of Ecology review comments made on Revision 0 dated November 21, 1989, and March 23, 1990, was submitted on June 22, 1990. This submittal, Revision 2, addresses Washington State Department of Ecology review comments made on Revision 1, dated June 22, 1990, August 30, 1990, December 18, 1990, and July 8, 1991

  15. State Waste Discharge Permit Application: Electric resistance tomography testing

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  16. Environmental permits in Arab Gulf countries - local government perspective

    International Nuclear Information System (INIS)

    Kuczynski, L.

    2002-01-01

    The legacy of past environmentally careless oil and gas exploration practices is becoming more apparent as time goes by and our understanding of causes and results increase. In many petroleum producing countries and in Arab Gulf countries in particular, this understanding has resulted in greater social demand for environmental protection and responsible exploitation of limited resources. In response to this demand, governments of the Gulf Region are paying increasingly more attention to the responsible management of environmental impacts of new developments. As a result, most of them require developers to obtain environmental permits supported by a variety of environmental baseline studies, Environmental Impact Assessments and comprehensive Environmental Management Plans. These local environmental requirements are similar to those in North America and Europe, although there are some important differences on account of local environmental, historical and socioeconomic conditions. Developers, who choose to ignore them, often find their projects caught in a web of unfamiliar environmental regulations or administrative procedures that may cause costly and unnecessary delays. Based on the author's Canadian and Arab Gulf regulatory experience, this paper describes some common causes that may delay obtaining environmental permits or cause cancellation of a project, and provides ideas to assist companies in securing necessary permits and licenses. (author)

  17. State Waste Discharge Permit Application: Electric resistance tomography testing

    International Nuclear Information System (INIS)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks

  18. The impact of city-level permitting processes on residential photovoltaic installation prices and development times: An empirical analysis of solar systems in California cities

    International Nuclear Information System (INIS)

    Dong, Changgui; Wiser, Ryan

    2013-01-01

    With “soft” costs accounting for well over 50% of the installed price of residential photovoltaic (PV) systems in the United States, this study evaluates the effect of city-level permitting processes on the installed price of residential PV systems and on the time required to develop those systems. The study uses a unique dataset from the U.S. Department of Energy's Rooftop Solar Challenge Program, which includes city-level permitting process “scores,” plus data from the California Solar Initiative and the U.S. Census. Econometric methods are used to quantify the price and development-time effects of city-level permitting processes on more than 3000 PV installations across 44 California cities in 2011. Results suggest that cities with the most favorable permitting practices can reduce average residential PV prices by $0.27–$0.77/W (4–12% of median PV prices in California) compared with cities with the most onerous permitting practices, depending on the regression model used. Though the empirical models for development times are less robust, results suggest that the most streamlined permitting practices may shorten development times by around 24 days on average (25% of the median development time). These findings illustrate the potential price and development-time benefits of streamlining local permitting procedures for PV systems. - Highlights: • The study uses a unique dataset from the U.S. DOE's Rooftop Solar Challenge Program. • We quantify the price and development-time effects of city-level permitting processes. • Most favorable permitting practices can reduce average residential PV prices by $0.27–$0.77/W

  19. 77 FR 43281 - Notice of Issuance of Final Air Permits for BHP Billiton Petroleum, Inc., Murphy Exploration and...

    Science.gov (United States)

    2012-07-24

    ... Production Co., and Eni US Operating Co., Inc. AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... modification for Eni US Operating Company, Inc. (Eni) on May 8, 2012 that was effective on May 11, 2012. The... Mississippi River and 125 miles from the nearest Alabama and Florida coast. The Eni permit regulates air...

  20. 77 FR 3771 - Notice of Issuance of Final Outer Continental Shelf Air Permit for Shell Offshore, Inc.

    Science.gov (United States)

    2012-01-25

    ... locations within Shell's DeSoto Canyon and Lloyd Ridge lease locations on the OCS in the Gulf of Mexico... INFORMATION CONTACT: Lori Shepherd, Air Permits Section, Air Planning Branch, Air, Pesticides and Toxics... effective on December 30, 2011. Dated: January 12, 2012. Beverly H. Banister, Director, Air, Pesticides and...

  1. 76 FR 8997 - Notice of Decision To Issue Permits for the Importation of Fresh Strawberries From Jordan Into...

    Science.gov (United States)

    2011-02-16

    ...] Notice of Decision To Issue Permits for the Importation of Fresh Strawberries From Jordan Into the... continental United States of fresh strawberries from Jordan. Based on the findings of a pest risk analysis... strawberries from Jordan. DATES: Effective Date: February 16, 2011. FOR FURTHER INFORMATION CONTACT: Ms. Donna...

  2. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  3. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  4. Inertia system for permitting or preventing any movement between two components

    International Nuclear Information System (INIS)

    Pelat, Patrice; Le Pierres, Gildas.

    1977-01-01

    This impact jamming device allows relative movement between two parts with respect to each other so long as the relative acceleration remains under a given preset figure. On the other hand, it locks to stop this relative movement as soon as this acceleration exceeds this figure. Such a mechanism can be used, in particular, the holding the pipes in nuclear power stations so as to permit a slow movement of the pipes with respect to the structure, for example under the effect of expansion, but to check any relative movement in the event of significant acceleration, for example during an earthquake [fr

  5. Developing a methodology for real-time trading of water withdrawal and waste load discharge permits in rivers.

    Science.gov (United States)

    Soltani, Maryam; Kerachian, Reza

    2018-04-15

    In this paper, a new methodology is proposed for the real-time trading of water withdrawal and waste load discharge permits in agricultural areas along the rivers. Total Dissolved Solids (TDS) is chosen as an indicator of river water quality and the TDS load that agricultural water users discharge to the river are controlled by storing a part of return flows in some evaporation ponds. Available surface water withdrawal and waste load discharge permits are determined using a non-linear multi-objective optimization model. Total available permits are then fairly reallocated among agricultural water users, proportional to their arable lands. Water users can trade their water withdrawal and waste load discharge permits simultaneously, in a bilateral, step by step framework, which takes advantage of differences in their water use efficiencies and agricultural return flow rates. A trade that would take place at each time step results in either more benefit or less diverted return flow. The Nucleolus cooperative game is used to redistribute the benefits generated through trades in different time steps. The proposed methodology is applied to PayePol region in the Karkheh River catchment, southwest Iran. Predicting that 1922.7 Million Cubic Meters (MCM) of annual flow is available to agricultural lands at the beginning of the cultivation year, the real-time optimization model estimates the total annual benefit to reach 46.07 million US Dollars (USD), which requires 6.31 MCM of return flow to be diverted to the evaporation ponds. Fair reallocation of the permits, changes these values to 35.38 million USD and 13.69 MCM, respectively. Results illustrate the effectiveness of the proposed methodology in the real-time water and waste load allocation and simultaneous trading of permits. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. A Regional Multi-permit Market for Ecosystem Services

    Science.gov (United States)

    Bernknopf, R.; Amos, P.; Zhang, E.

    2014-12-01

    Regional cap and trade programs have been in operation since the 1970's to reduce environmental externalities (NOx and SOx emissions) and have been shown to be beneficial. Air quality and water quality limits are enforced through numerous Federal and State laws and regulations while local communities are seeking ways to protect regional green infrastructure and their ecosystems services. Why not combine them in a market approach to reduce many environmental externalities simultaneously? In a multi-permit market program reforestation (land offsets) as part of a nutrient or carbon sequestration trading program would provide a means to reduce agrochemical discharges into streams, rivers, and groundwater. Land conversions also improve the quality and quantity of other environmental externalities such as air pollution. Collocated nonmarket ecosystem services have societal benefits that can expand the crediting system into a multi-permit trading program. At a regional scale it is possible to combine regulation of water quality, air emissions and quality, and habitat conservation and restoration into one program. This research is about the economic feasibility of a Philadelphia regional multi-permit (cap and trade) program for ecosystem services. Instead of establishing individual markets for ecosystem services, the assumption of the spatial portfolio approach is that it is based on the interdependence of ecosystem functions so that market credits encompasses a range of ecosystem services. Using an existing example the components of the approach are described in terms of scenarios of land portfolios and the calculation of expected return on investment and risk. An experiment in the Schuylkill Watershed will be described for ecosystem services such as nutrients in water and populations of bird species along with Green House Gases. The Philadelphia regional market includes the urban - nonurban economic and environmental interactions and impacts.

  7. City of Richland 300 Area industrial wastewater permit application

    International Nuclear Information System (INIS)

    1995-05-01

    Battelle-Pacific Northwest Labs and Westinghouse Hanford Co. are responsible for operating most of the facilities within the 300 Area; other contractors are also involved. The document gives briefly water/wastewater data: water sources, water usage, water discharge/loss, NPDES permit status, plant sewer outlets size and flow, etc. The document also includes the following attachments: 300 Area building list, Oct. 1993-Oct. 1994 300 Area water balance, waste shipments for CY 1994, complete chemical listing, sanitary sewer sampling results (12/19/94, 1/18/95, 1/15/95), and priority pollutant listings

  8. USDA Forest Service, Rocky Mountain Region PSD Permit Completeness Determination

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Early Site Permit, The Assessment of a Site

    International Nuclear Information System (INIS)

    Copete, M.; Cervantes, E.; Sabate, R.

    2010-01-01

    The vast majority of today's power plants were licensed during the 60s, 70s and 80s. Commercial nuclear energy was new, and the regulatory process evolved along with the new industry. Plants were issued a construction permit based on a preliminary design. Safety issues were not fully resolved until the plant was essentially complete, which meant utilities had high risks of increasing costs and schedule as well as the public did not have access to the details of the design until construction was nearly complete. To address these issues, the U.S. Nuclear Regulatory Commission (NRC) in 1989 established a new licensing process: 10 CFR Part 52.

  10. Improved Safety and Efficiency of Protected/Permitted Right-Turns in Oregon

    Science.gov (United States)

    2018-05-01

    This research aimed to develop an understanding of the safety and operational implications of using the flashing yellow arrow (FYA) in permitted and protected/permitted right turn (PPRT) operations to maximize safety and efficiency. This report inclu...

  11. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    Science.gov (United States)

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  12. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  13. 76 FR 3153 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-01-19

    ... enhancement of survival in the wild. Permit Application Number: TE106220. Applicant: Brianne L. Walters, Terre..., Terre Haute, IN. The applicant requests a renewal of his permit to take (capture and release) Indiana...

  14. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  15. Wisconsin Public Service, Weston Generating Station; Petition to Object to Issuance of Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  16. 77 FR 55475 - Federal Acquisition Regulation; Information Collection; Permits, Authorities, or Franchises

    Science.gov (United States)

    2012-09-10

    ...; Information Collection; Permits, Authorities, or Franchises AGENCY: Department of Defense (DOD), General... approved information collection requirement concerning permits, authorities, or franchises for regulated..., Authorities, or Franchises, by any of the following methods: Regulations.gov : http://www.regulations.gov...

  17. 78 FR 277 - Section 610 Review of NPDES Permit Regulation and Effluent Limitations Guidelines Standards for...

    Science.gov (United States)

    2013-01-03

    ..., Section 610 Review of NPDES Permit Regulation and Effluent Limitations Guidelines Standards for..., FRL-9764-8] Section 610 Review of NPDES Permit Regulation and Effluent Limitations Guidelines Standards for Concentrated Animal Feeding Operations (CAFOs); Extension of Comment Period AGENCY...

  18. 25 CFR 161.301 - What will a grazing permit contain?

    Science.gov (United States)

    2010-04-01

    ... permits will contain the following provisions: (1) Name of permit holder; (2) Range management plan...) Animal identification requirements (i.e., brand, microchip, freeze brand, earmark, tattoo, etc.); (6...

  19. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  20. 40 CFR 70.8 - Permit review by EPA and affected States.

    Science.gov (United States)

    2010-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements... PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.8 Permit review by EPA and affected States. (a...