WorldWideScience

Sample records for permit number nev

  1. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-16

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream; a description and quantity of each waste stream in tons and cubic feet received at the facility; the method of treatment, storage, and/or disposal for each waste stream; a description of the waste minimization efforts undertaken; a description of the changes in volume and toxicity of waste actually received; any unusual occurrences; and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  2. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, P. M.

    2013-02-21

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

  3. NEV Technology in China

    DEFF Research Database (Denmark)

    Liu, Yingqi; Kokko, Ari

    2012-01-01

    Purpose – The purpose of the paper is to identify the main determinants of the development of the neighbourhood electric vehicle (NEV) industry in China, including influences from private stakeholders as well as the government, and domestic as well as foreign interest groups. Particular emphasis...... – The findings are useful for understanding the development of the NEV industry in China. Originality/value – The current paper is the first application of the GIST (Governance of Innovation towards Sustainability Technology) framework to the case of the Chinese NEV industry....

  4. Guidelines for the Establishment of a Model Neighborhood Electric Vehicle (NEV) Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Roberta Brayer; Donald Karner; Kevin Morrow; James Francfort

    2006-06-01

    The U.S. Department of Energy’s Advanced Vehicle Testing Activity tests neighborhood electric vehicles (NEVs) in both track and fleet testing environments. NEVs, which are also known as low speed vehicles, are light-duty vehicles with top speeds of between 20 and 25 mph, and total gross vehicle weights of approximately 2,000 pounds or less. NEVs have been found to be very viable alternatives to internal combustion engine vehicles based on their low operating costs. However, special charging infrastructure is usually necessary for successful NEV fleet deployment. Maintenance requirements are also unique to NEVs, especially if flooded lead acid batteries are used as they have watering requirements that require training, personnel protection equipment, and adherence to maintenance schedules. This report provides guidelines for fleet managers to follow in order to successfully introduce and operate NEVs in fleet environments. This report is based on the NEV testing and operational experience of personnel from the Advanced Vehicle Testing Activity, Electric Transportation Applications, and the Idaho National Laboratory.

  5. The impact of government policy on preference for NEVs: The evidence from China

    International Nuclear Information System (INIS)

    Zhang, Xian; Wang, Ke; Hao, Yu; Fan, Jing-Li; Wei, Yi-Ming

    2013-01-01

    To reduce gasoline consumption and emissions, the Chinese government has introduced a series of preferential policies to encourage the purchase of new energy vehicles (NEVs). However, enthusiasm for the private purchase of NEVs appears to be very low. This timely paper addresses the need for an empirical study to explore this phenomenon by identifying purchase motivations of potential NEV consumers and examining the impact of government policies introduced to promote NEVs in China. A questionnaire survey was carried out. The acceptance of NEVs is measured in three different logistic models: the willingness of consumers to purchase NEVs, the purchasing time, and the acceptable price. The results showed that financial benefits, performance attributes, environmental awareness and psychological needs are the four most important factors influencing consumers’ acceptance of NEVs. Among these, performance attributes rather than financial benefits are the most important indicator. The moderating effect of government policies to relations between purchasing intention, time and price is not strong as respected while the policy implications are clear that the ‘public awareness of government policy’ functions as a moderator in the process of acceptance. These findings could give some hints to the government to make better NEV industry policy. - Highlights: • This paper timely studies the private purchasing behaviors of NEVs in China. • Purchase motivations of NEVs and the impact of government policies are examined. • Performance attribute is the most important indicator to acceptance of NEVs. • The moderating effect of government policies is not strong as respected

  6. Research on Technology Innovation of China's NEV Industry Based on Patent Analysis

    DEFF Research Database (Denmark)

    Wang, Jingyu; Liu, Yingqi; Kokko, Ari

    2016-01-01

    Purpose/Significance: The development of Chinas new energy vehicle(NEV) industry is concerned by both the government and enterprises. Method/Process: Based on the patent data, this paper conducts a deep analysis on the technology innovation of Chinas NEV industry from three perspectives- the year...... distribution of the patent, the distribution of the patent applicants and the distribution of patent technology area. Then, the paper makes further correlation analysis on the NEV industry chain and the patent data. Result/Conclusion: In general,the paper comprehensively reflects the whole picture of Chinas...... NEV industry technology innovation and gives some ideas for its further development....

  7. Resistivity and Seismic Surface Wave Tomography Results for the Nevşehir Kale Region: Cappadocia, Turkey

    Science.gov (United States)

    Coşkun, Nart; Çakır, Özcan; Erduran, Murat; Arif Kutlu, Yusuf

    2014-05-01

    The Nevşehir Kale region located in the middle of Cappadocia with approximately cone shape is investigated for existence of an underground city using the geophysical methods of electrical resistivity and seismic surface wave tomography together. Underground cities are generally known to exist in Cappadocia. The current study has obtained important clues that there may be another one under the Nevşehir Kale region. Two-dimensional resistivity and seismic profiles approximately 4-km long surrounding the Nevşehir Kale are measured to determine the distribution of electrical resistivities and seismic velocities under the profiles. Several high resistivity anomalies with a depth range 8-20 m are discovered to associate with a systematic void structure beneath the region. Because of the high resolution resistivity measurement system currently employed we were able to isolate the void structure from the embedding structure. Low seismic velocity zones associated with the high resistivity depths are also discovered. Using three-dimensional visualization techniques we show the extension of the void structure under the measured profiles.

  8. Lastevihkaja Daniil Harms ja puuslik Leonid Iljitš Brežnev / Vaapo Vaher

    Index Scriptorium Estoniae

    Vaher, Vaapo, 1945-

    2011-01-01

    Tutvustus: Harms, Daniil. Väljapudunevad vanaeided / tõlkinud Ilona Martson ja Rein Saluri. Tallinn : Tänapäev, 2011 ; Bourget, Paul. Õpilane / tõlkinud Kattri Ezzoubi. Tallinn : Eesti Raamat, 2011 ; Mletšin, Leonid. Brežnev. Tallinn : Varrak, 2011

  9. Assessment of geothermal energy potential by geophysical methods: Nevşehir Region, Central Anatolia

    Science.gov (United States)

    Kıyak, Alper; Karavul, Can; Gülen, Levent; Pekşen, Ertan; Kılıç, A. Rıza

    2015-03-01

    In this study, geothermal potential of the Nevşehir region (Central Anatolia) was assessed by using vertical electrical sounding (VES), self-potential (SP), magnetotelluric (MT), gravity and gravity 3D Euler deconvolution structure analysis methods. Extensive volcanic activity occurred in this region from Upper Miocene to Holocene time. Due to the young volcanic activity Nevşehir region can be viewed as a potential geothermal area. We collected data from 54 VES points along 5 profiles, from 28 MT measurement points along 2 profiles (at frequency range between 320 and 0.0001 Hz), and from 4 SP profiles (total 19 km long). The obtained results based on different geophysical methods are consistent with each other. Joint interpretation of all geological and geophysical data suggests that this region has geothermal potential and an exploration well validated this assessment beyond doubt.

  10. 33 CFR 162.220 - Hoover Dam, Lake Mead, and Lake Mohave (Colorado River), Ariz.-Nev.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Hoover Dam, Lake Mead, and Lake... REGULATIONS § 162.220 Hoover Dam, Lake Mead, and Lake Mohave (Colorado River), Ariz.-Nev. (a) Lake Mead and... the axis of Hoover Dam and that portion of Lake Mohave (Colorado River) extending 4,500 feet...

  11. Výhody a nevýhody motoru koncepce "Geared Turbofan"

    OpenAIRE

    Marko, Libor

    2012-01-01

    Práca popisuje historický vývoj turbodúchadlových motorov, ktorý súvisí zo zvyšovaním hodnoty obtokového pomeru. Obsahuje základné charakteristiky turbodúchadlových motorov a princíp práce komponentov motora. Súčasťou práce je popis výhod a nevýhod motora koncepcie Geared Turbofan v porovnaní s konvenčnými turbodúchadlovými motormi rovnakej triedy ťahu. The thesis describes the historical development of turbofan engines, which relates to the increase in amount of bypass ratio. It contains ...

  12. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  13. Knowledge Levels and Attitudes of People Living in the City Centre of Nevşehir on Organ Donation and Transplantation

    Science.gov (United States)

    Yazar, Mehmet Akif; Açıkgöz, Mehmet Barış

    2016-01-01

    Objective The purpose of this descriptive study was to determine the knowledge levels and attitudes of people living in Nevşehir on organ donation (OD) and transplantation. Methods Data were collected using a questionnaire administered to 414 people residing in Nevşehir between February and May 2016. The primary and secondary endpoints of the present study were to determine the attitudes and knowledge levels of participants on OD and transplantation, respectively. Results Four hundred and fourteen people between the ages 20 and 65 years participated. In total, 8.9% of the participants correctly answered the question ‘What is necessary for donating an organ?’ and 31.4% of them correctly answered the question ‘What is brain death?’ Moreover, 53.1% of the participants stated that they wanted to receive reliable information on OD from OD centres. There was a close relationship between high education level and the willingness to donate organs (pdonate organs: 22.9% of them explained that their decision was because of their religious beliefs and 19.6% stated that their families did not allow it. It was observed that people who accepted organs from others were more willing to donate organs to their relatives (p<0.05). Conclusion People living in Nevşehir do not have sufficient knowledge on OD; they had various concerns on the issue and wanted to receive information from OD centres. Exemplification and internalisation methods can be used in educational schedules to increase the OD. PMID:27909606

  14. MUSICAL TERMS IN DIVAN OF NEV'Î / NEV’Î DİVÂNI’NDA MÛSİKÎ TERİMLERİ

    Directory of Open Access Journals (Sweden)

    Mehmet Sait ÇALKA (M.A.H.

    2008-05-01

    Full Text Available Along with history, the music has taken an important place in Turkslife, as an expression of melancholy, happiness, heroism, exitement, and love.Music in Turks is old, as old as Turk history. Some history and musicscientists talk about 6000 years of Turkish Music History. Music took animportant place especially at the Ottoman Emperior Times. This situation ishappened at the times of II. Murat, II. Beyazıt, IV. Murat, II. Mustafa, III.Ahmet, III. Selim, II. Mahmut, due to their extra worth on music. Demand tomusic also effected the literature, and thus the divan poets used musicalterms in their performance.In our work, we are going to stress on 16th Century Divan PoetNev's musical components.

  15. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  16. Modeling the CO2 emissions and energy saved from new energy vehicles based on the logistic-curve

    International Nuclear Information System (INIS)

    Tang, Bao-jun; Wu, Xiao-feng; Zhang, Xian

    2013-01-01

    The Chinese government has outlined plans for developing new energy vehicles (NEVs) to achieve energy conservation and emission reduction. This paper used a logistic-curve to predict the market share of NEVs in the next decade, and then calculated the potential environment benefits of each and every car or the total according to the report of IPCC (2006). The results indicated that NEVs were of benefit in achieving above goals, particularly electric vehicles (EVs). However, they will have a limited impact in the short term. Finally, considering the empirical results and the Chinese reality, this paper proposed corresponding recommendations. - Highlights: ► This paper predicted the number of vehicles in China. ► This paper used a logistic-curve to predict the market share of NEVs. ► The potential environment benefits of every car or the total were calculated. ► China's NEVs would produce more CO 2 than those of other countries

  17. Nevşehir İli Patates Ekiliş Alanlarında Patates Siğil Hastalığı (Synchytrium Endobioticum)'na Karşı Çeşit Reaksiyonlarının Belirlenmesi

    OpenAIRE

    GÜNAÇTI, Hale; ERKILIÇ, Ali

    2014-01-01

    Potato wart disease is caused by the soil borne fungus Synchytrium endobioticum (Schilberszky) Percival belong to Chytridiomycetes class as an obligate fungus. In order to determine the varietal reactions against the pathogen, an experiment was conducted in Derinkuyu district in Nevşehir, in 2008. Thirty varieties including industrial and table ones, were used in the trial. The lowest disease intensity ratio (11.1%) was recorded on Jelly variety. In addition, 15 varieties showing much toleran...

  18. 78 FR 26384 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2013-05-06

    ... E. Freemont Lake Road, Pinedale, WY 82941 The applicant requests the renewal of an existing permit... the permit you are interested in by number (e.g., Permit No. TE-106387). Email: [email protected] . Please refer to the respective permit number (e.g., Permit No. TE-106387) in the subject line of the...

  19. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  20. Cumhuriyetin İlk Yıllarında Nevşehir’de Bankacılık Faaliyetleri; Nevşehir Bankası T.A.Ş ve Ürgüp Zürra ve Tüccar Bankası T.A.Ş Banking Activities In The Early Years Of The Republic Of Turkey In Nevşehir; Nevşehir Bank And Ürgüp Zürra And Tüccar Bank

    Directory of Open Access Journals (Sweden)

    Emin ÖZDEMİR

    2013-07-01

    ilk bankadır. 1856 yılında İngiliz sermayesi ile kurulan Osmanlı Bankasından sonra Mithat Paşa’nın kooperatifçilik denemesi olarak başlattığı tarımsal kredi veren sandık faaliyetleri, ilk devlet bankası olan Ziraat Bankası’nın kurulmasıyla neticelenir. Osmanlı Devleti’nde daha çok yabancı sermayenin kontrolünde olan bankacılık sektöründe II. Meşrutiyet döneminde değişim yaşanır. Bu dönemde İttihat Terakki Partisi’nin iktidara gelmesiyle Parti üzerinde etkili olan milliyetçi politikalar, ekonomik hayatta da tesirli olur. Milli bir ekonominin ancak milli sermayeye dayalı şirketlerle yürütülebileceğine inanan Parti yönetimi, bu amaca yönelik ülke genelinde yerel bankalar kurulmasında öncü olur. II. Meşrutiyet döneminde yerel bankacılık konusunda elde edilen tecrübeler Cumhuriyet dönemi ekonomik hayatına katkı sağlar. İzmir İktisat Kongresi’nde alınan kararlar doğrultusunda ekonomik kalkınmayı sağlamak için gerekli sermayeyi sağlayacak yerel bankalar kurulması kararlaştırılır. Bu meyanda Nevşehir’de Nevşehir Bankası TAŞ, Ürgüp’te ise Ürgüp Zürra Bankası TAŞ kurulur. Bölge halkına uygun krediler vermek amacıyla kurulan bu bankalar sayesinde halkın para ve sermaye piyasasına katılması ve tasarrufun artırılması da hedeflenir.

  1. Diatom community and palaeoenvironmental properties of Karacaören diatomite deposits (Nevşehir, Central Anatolia, Turkey)

    Science.gov (United States)

    Yıldız, Ayşegül; Gürel, Ali; Dursun, Yusuf Gökhan

    2017-10-01

    The diatom community and palaeoenvironmental properties of volcano genetic diatomite deposits that outcrop in the Karacaören (Nevşehir) area are described. Two stratigraphic sections were measured in the study area. One of these sections was measured in Quaternary lake units (K1), and the other in lacustrine sediments of the late Miocene-Pliocene Ürgüp Formation's Bayramhacılı Member (K2). According to stratigraphic and chemical characteristics of the sections, two distinct paleogeographic domains were determined in the study area. One of these, the shallow lacustrine to fluvial area (Quaternary) which is represented by an alternating sequence of diatomite, silt/mud, and tuffite. The other was the deeper lacustrine stage (late Miocene) which is represented by diatomites with some interbedded mud facies, chert and volcanics. From the diatomite samples of these sections, twenty-five species of 10 different diatom genera were identified. When evaluated together, the ecological properties and the distribution of numerical values of the determined diatom genera and species, showed that the study area's diatomite was generally deposited in shallow, high temperature, nutrient-rich water, where nitrogen and phosphorus were abundant and which was an alkaline (pH > 7) freshwater lake environment. Over time the pH value of the environment decreased (pH < 7), and the environment became acidic.

  2. 76 FR 50246 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-08-12

    ... species in the wild. Permit Application Number: TE212427. Applicant: Ecology and Environment, Inc... wild. Permit Application Number: TE48835A. Applicant: Applied Science & Technology, Inc., Brighton, MI...

  3. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2005 and... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871...

  4. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  5. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  6. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  7. 75 FR 9248 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2010-03-01

    ... Applications Permit Application Number: TE006012. Applicant: Steven Taylor, Center for Biodiversity, Illinois... State University, Springfield, Missouri. The applicant requests a permit renewal to take (capture and... Application Number: TE02560A. Applicant: Timothy C. Carter, Ball State University, Muncie, Indiana. The...

  8. Operating Efficiency Evaluation of China Listed Automotive Firms: 2012–2016

    Directory of Open Access Journals (Sweden)

    Huichen Jiang

    2018-01-01

    Full Text Available As one of the important pillar industries in China, the automotive industry (i.e., the traditional vehicle and the new energy vehicle (NEV sub-industries plays a significant role in the national economy and social development. In this paper, by using the fixed assets, intangible assets, the operating expenses, and the number of employee as inputs and the operating income as output, we conduct efficiency evaluations based on data envelopment analysis (DEA and Malmquist models, and measure the efficiency of listed automotive firms with the panel data of 77 listed A-share firms spanning from 2012 to 2016, statically and dynamically. The results show that the five-year average Malmquist indices of all the listed firms slightly decreased due to the decline of the technical change and the improvement of the efficiency change. We subdivide the automotive industry into the traditional vehicle and NEV industries, and find that the NEV industry performed better than the traditional one. We combine the industry development and efficiency evaluation, and believe that the NEV will be a new driving force of the economy.

  9. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  10. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  11. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Operating Permit (Permit Number: V-UO-000979-2017.00), statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Andeavor Walker Hollow Compressor Station.

  12. 76 FR 3153 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-01-19

    ... enhancement of survival in the wild. Permit Application Number: TE106220. Applicant: Brianne L. Walters, Terre..., Terre Haute, IN. The applicant requests a renewal of his permit to take (capture and release) Indiana...

  13. Wilderness Management... A Computerized System for Summarizing Permit Information

    Science.gov (United States)

    Gary H. Elsner

    1972-01-01

    Permits were first needed for visits to wilderness areas in California during summer 1971. A computerized system for analyzing these permits and summarizing information from them has been developed. It produces four types of summary tables: point-of-origin of visitors; daily variation in total number of persons present; variations in group size; and variations in...

  14. POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 110: AREA 3 WMD U-3AX/BL CRATER, NEVADA TEST SITE, NEVADA FOR THE PERIOD JULY 2004 - JUNE 2005

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2005-08-01

    This Post-Closure Inspection and Monitoring report provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 Waste Management Division (WMD) U-3ax/bl Crater. This report includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2004 through June 2005. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and use restriction warning signs was good. Settling was observed that exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (cm) (6 inches [in]) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection.

  15. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  16. Analysis of genetic code ambiguity arising from nematode-specific misacylated tRNAs.

    Directory of Open Access Journals (Sweden)

    Kiyofumi Hamashima

    Full Text Available The faithful translation of the genetic code requires the highly accurate aminoacylation of transfer RNAs (tRNAs. However, it has been shown that nematode-specific V-arm-containing tRNAs (nev-tRNAs are misacylated with leucine in vitro in a manner that transgresses the genetic code. nev-tRNA(Gly (CCC and nev-tRNA(Ile (UAU, which are the major nev-tRNA isotypes, could theoretically decode the glycine (GGG codon and isoleucine (AUA codon as leucine, causing GGG and AUA codon ambiguity in nematode cells. To test this hypothesis, we investigated the functionality of nev-tRNAs and their impact on the proteome of Caenorhabditis elegans. Analysis of the nucleotide sequences in the 3' end regions of the nev-tRNAs showed that they had matured correctly, with the addition of CCA, which is a crucial posttranscriptional modification required for tRNA aminoacylation. The nuclear export of nev-tRNAs was confirmed with an analysis of their subcellular localization. These results show that nev-tRNAs are processed to their mature forms like common tRNAs and are available for translation. However, a whole-cell proteome analysis found no detectable level of nev-tRNA-induced mistranslation in C. elegans cells, suggesting that the genetic code is not ambiguous, at least under normal growth conditions. Our findings indicate that the translational fidelity of the nematode genetic code is strictly maintained, contrary to our expectations, although deviant tRNAs with misacylation properties are highly conserved in the nematode genome.

  17. The Effect of Emission Permits and Pigouvian Taxes on Market Structure

    Energy Technology Data Exchange (ETDEWEB)

    Bunuel, M.

    2001-07-01

    Differently from Pigouvian taxes and direct regulation, tradable emission permits can decrease competition in a polluting industry under certain circumstances. Assume a potential entrant who can buy every permit. When permits are given free to current polluters, monopolization occurs if not every polluter foresees it. If foreseen, polluters want to free ride on the entrant's market power, but entry can still occur, although not with certainty. Considering a symmetric, mixed-strategy equilibrium with unconditional bids, the probability of entry decreases as the number of polluters increase. When permits are sold initially, monopolization occurs without more requirements than polluters being financially constrained. (Author)

  18. Field Operations Program Neighborhood Electric Vehicles - Fleet Survey

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward; Carroll, M.

    2001-07-01

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles(NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog- forming emissions annually.

  19. Field Operations Program - Neighborhood Electric Vehicle Fleet Use

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J. E.; Carroll, M. R.

    2001-07-02

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles (NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog-forming emissions annually.

  20. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014–September 2015), Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2016-03-01

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

  1. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014-September 2015), Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

  2. 75 FR 26268 - Agency Information Collection Activities: Permit To Transfer Containers to a Container Station

    Science.gov (United States)

    2010-05-11

    ... Activities: Permit To Transfer Containers to a Container Station AGENCY: U.S. Customs and Border Protection... information collection requirement concerning the: Permit to Transfer Containers to a Container Station. This... information collection: Title: Permit to Transfer Containers to a Container Station. OMB Number: 1651-0049...

  3. A comparison of taxes and tradable permits in national climate policy

    Energy Technology Data Exchange (ETDEWEB)

    Holtsmark, Bjart J.

    1999-11-01

    This article discusses domestic climate policy design in a country that has made a binding commitment to the Kyoto Protocol but at the same time want to limit the number of industry shutdowns that follows from the policy. It is furthermore considered how public budget constraints might affect climate policies. The similarities between an optionally designed taxation regime and a domestic tradable permit regime that is integrated into the international permit market are brought into focus. The similarities presuppose a greenhouse gas tax that fluctuates in accordance with the international permit price. It is argued that climate policy can generate double dividends but that the allocation of free permits reduces these dividends. It is concluded that some organisations promotion of systems tradable permits with distribution of permits free of charge as an alternative to carbon taxes must be understood from their effect on income distribution. 17 refs

  4. Hanford facility dangerous waste permit application, low-level burial grounds

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20)

  5. Hanford facility dangerous waste permit application, low-level burial grounds

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, R.H.

    1997-08-12

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  6. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  7. 78 FR 9067 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2013-02-07

    ... County, Alabama. Permit Application Number: TE-91366A Applicant: Dr. Paul Stewart, Troy, Alabama...: TE-91373A Applicant: Jonathan Miller, Troy, Alabama. Applicant requests authorization to take...

  8. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  9. Hanford Facility dangerous waste permit application, general information

    International Nuclear Information System (INIS)

    1993-05-01

    The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility

  10. Net energy value of maize ethanol as a response to different climate and soil conditions in the southeastern USA

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Tomas; Garcia y Garcia, Axel; Paz, Joel O.; Hoogenboom, Gerrit [Department of Biological and Agricultural Engineering, 1109 Experiment Street, The University of Georgia, Griffin, GA 30223 (United States); Jones, James W. [Department of Agricultural and Biological Engineering, Frazier Rogers Hall, University of Florida, Gainesville, FL 32611 (United States)

    2009-08-15

    A recent increase in the demand for bio-ethanol has sparked maize production in the USA and other countries across the world. The net energy value (NEV), i.e. the energy output in ethanol and co-products after accounting for energy input requirements in the production chain of ethanol, is a measure of its sustainability. Grain yield of maize, which varies substantially across different climate and soil conditions, greatly impacts the ethanol NEV. The objectives of this study were to determine i) the NEV of ethanol produced from maize grown in four production regions in the southeastern USA and, ii) the specific impact of local soil variability under the same climate conditions within the four regions on the NEV of maize-ethanol. Maize yield was simulated with the Cropping System Model (CSM)-CERES-Maize model for soil and weather conditions, and management practices representing Bulloch, Floyd, Laurens and Mitchell counties, Georgia, USA. The calculation of ethanol NEV took into account the energy inputs and outputs of the entire ethanol production chain, and was based on the crop simulations. There were statistically significant differences in ethanol NEV among the counties, and within counties due to local soil variability. Differences in ethanol NEV among counties were partially due to different transportation distances. Based on the results of this study, it was concluded that maize-ethanol NEV can be increased by accounting for the soil and climate factors in the feedstock production and by locating ethanol-processing facilities in regions with soil and climate conditions that are favorable for ethanol-maize production. (author)

  11. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  12. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  13. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  14. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  15. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  16. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  17. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    Energy Technology Data Exchange (ETDEWEB)

    Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  18. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  19. 77 FR 25717 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging

    Science.gov (United States)

    2012-05-01

    ...) General Permit (IDG-37-0000) to placer mining operations in Idaho for small suction dredges (intake nozzle... ENVIRONMENTAL PROTECTION AGENCY [FRL-9666-1] Proposed Issuance of a General NPDES Permit for Small... certifies ``will not, if promulgated, have a significant economic impact on a substantial number of small...

  20. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  1. NPDES Permit for Super Concrete Ready-Mix Corp. (Aggregate Industries)

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number DC0000175, Super Concrete Ready-Mix Corporation is authorized to discharge from a facility to receiving waters named unnamed tributary to Northwest Branch of the Anacostia River.

  2. 75 FR 19997 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2010-04-16

    ... Application Number: TE07361A. Applicant: Nicholas L. Owens, Chicago, Illinois. The applicant requests a permit... (Epioblasma brevidens), Oyster Mussel (E. capsaeformis), Tan riffleshell (E. florentina walkeri), Catspaw (E...

  3. 77 FR 65166 - Information Collection; Request for Comment; Visitor Permit and Visitor Registration Card

    Science.gov (United States)

    2012-10-25

    ..., number of dogs and number of pack and saddle stock (that is, the number of animals either carrying people... dogs, number of pack and saddle stock (that is, the number of animals either carrying people or their... people. The information collected from the Visitor's Permit (FS-2300-30) and Visitor Registration Card...

  4. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  5. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  6. NPDES Permit for Soap Creek Associates Wastewater Treatment Facility in Montana

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number MT-0023183, Soap Creek Associates, Inc. is authorized to discharge from its wastewater treatment facility located in West, Bighorn County, Montana, to Soap Creek.

  7. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  8. Interactive Data Framework and User Interface for Wisconsin’s Oversize-Overweight Vehicle Permits

    Directory of Open Access Journals (Sweden)

    Ahmed S. Shatnawi

    2018-06-01

    Full Text Available With continuing increases in the number of Oversize-Overweight (OSOW vehicle permits issued in recent years, the management and analysis of OSOW permit data is becoming more inefficient and time-consuming. Large quantities of archived OSOW permit data are held by Departments of Transportation (DOTs across the United States, and manual extraction and analysis of this data requires significant effort. In this paper, the authors present a new framework for analyzing Wisconsin’s historic OSOW permit program data. This framework provides an interactive, web-based interface to query the OSOW permit data, link OSOW records to geospatial data features, and dynamically visualize query results. The web-based interface offers scalability and broad accessibility to the data across different DOT divisions, and use cases. Furthermore, a user survey and heuristic evaluation of the interface demonstrate the project’s utility, and identify goals for future system development.

  9. 76 FR 4683 - Pesticide Experimental Use Permit; Receipt of Application; Comment Request

    Science.gov (United States)

    2011-01-26

    ... telephone number is (703) 305-5805. FOR FURTHER INFORMATION CONTACT: Mike Mendelsohn, Biopesticides and... permits. Dated: January 12, 2011. Keith A. Matthews, Acting Director, Biopesticides and Pollution...

  10. Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the ''Federal Facility Agreement and Consent Order'' of 1996. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site ''Resource Conservation and Recovery Act'' Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: Semiannual inspections of the site using inspection checklists; Photographic documentation; Field note documentation; and Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2006 to June 2007 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C

  11. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  12. 77 FR 2311 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2012-01-17

    ..., Logan, OH. The applicant requests a permit to take (capture and release) Indiana bats in the States of... Application Number: TE62334A. Applicant: Mark Hove, University of Minnesota, St. Paul, MN. The applicant...

  13. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  14. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  15. 78 FR 36725 - Numbering Policies for Modern Communications; IP-Enabled Services; Telephone Number Requirements...

    Science.gov (United States)

    2013-06-19

    ... help speed the delivery of innovative services to consumers and businesses, while preserving the... available for public inspection during regular business hours in the FCC Reference Information Center... already broken the historical tie between a number and a specific device. For example, Skype permits users...

  16. 30 CFR 843.13 - Suspension or revocation of permits: Pattern of violations.

    Science.gov (United States)

    2010-07-01

    ... order to a permittee requiring him or her to show cause why his or her permit and right to mine under... the circumstances, including: (i) The number of violations, cited on more than one occasion, of the... number of violations, cited on more than one occasion, of different requirements of the Act, this chapter...

  17. 77 FR 17494 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-26

    ... be conducted by the applicant over a 5-year period. Applicant: Feld Entertainment, Inc., Vienna, VA... import of any potential progeny born while overseas. The permit numbers and animals are: Tigers: Julie... sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive herd...

  18. 77 FR 25733 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2012-05-01

    .... ADDRESSES: Documents and other information submitted with the applications are available for review, subject... information from public review, we cannot guarantee that we will be able to do so. Permit Application Number..., capture, band, draw blood and conduct laparotomies on yellow-shouldered blackbirds (Agelaius xanthomus) in...

  19. A decision aid tool for equity issues analysis in emission permit allocations

    International Nuclear Information System (INIS)

    Vaillancourt, K.; Waaub, J.P.

    2004-01-01

    The general intention of global climate agreements is to stabilize greenhouse gases (GHG) concentrations in the atmosphere which contribute to climate change. Climate models indicate that the global average temperature will increase by about 1.4 to 5.8 degrees C by 2100 compared to the 1990 level. This study assumed the participation of all countries, including developing countries, to achieve a global GHG stabilization target. It examined international cooperation mechanisms such as permit trading to achieve global economic efficiency. The study proposed a decision aid tool that provides relevant information on various equitable permit allocation schemes. A dynamic multicriterion model was presented to share the global quantity of permits among 15 regions. Multiple definitions of equity were considered. A realistic simulation of the World-MARKAL energy model was conducted to demonstrate the potential application of the scheme in international negotiations. The goal was to propose a range of permit allocations for each country in order to restrict the number of possibilities and guide negotiations. A model of the global reduction scenario makes it possible to determine cost effective solutions and to calculate reduction costs. Equity issues related to permit allocations were also addressed along with permit allocations and net reduction costs for each region. 45 refs., 5 tabs., 2 figs., 1 appendix

  20. 77 FR 39984 - Information Collection; Recreation Administration Permit and Fee Envelope

    Science.gov (United States)

    2012-07-06

    ... cultural resources, provide for the health and safety of visitors, allocate capacity, and/or help cover the... their permit programs or disperse use, protect natural and cultural resources, provide for the health...), and the number in group. [[Page 39985

  1. NPDES Permit for Mesa Verde National Park Water Treatment Plant in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034462, the United States Department of the Interior, National Park Service is authorized to discharge from the Mesa Verde National Park water treatment plant, in Montezuma County, Colo.

  2. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  3. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  4. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  5. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  6. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  7. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  8. Web-enabled work permit system for fast breeder test reactor

    International Nuclear Information System (INIS)

    Madurai Meenachi, N.; Vinolia, K.; Ramanathan, V.

    2003-01-01

    The objective of this project is to computerize and web-enable the Work Permit System for the Fast Breeder Test Reactor (FBTR) at IGCAR, Kalpakkam. The existing Work Permit System at FBTR was studied in detail. Since all the formalities were paper-based, the risk of human error in scrutinizing all permits before reactor start-up was high. Compilation of reports (daily, monthly, yearly etc.) was tedious. The work permit system was therefore automated in order to enable the operation group manage the maintenance work carried out in the plant systematically with entries. The entire project was classified into five permit modules -maintenance, transfer, return, cancellation and reissue. Each module takes care of the entry and maintenance of data in their respective fields in their respective tables. The user is also provided with an option to take a hard copy of the report of his/her choice. A client/server based system was designed to web-enable the entire project. The server program was designed using VB 6.0 as the front-end and MS Access database as the back end to store the data. The client software was developed using Active Server Pages and published using personal web server in the Intranet. A number of administrative tools have been incorporated in the software to ensure access security and integrity of the database. An online help feature with search facilities was added to the software. The work permit system software is now already being used at FBTR and has been deemed to be an invaluable aid in empowering the availability of the reactor and determining the performance history of the equipment. (author)

  9. NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.

  10. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  11. NPDES Permit for Town of Lodge Grass Wastewater Treatment Facility in Montana

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System permit number MT0021890, the Town of Lodge Grass is authorized to discharge from from its wastewater treatment facility in Big Horn County to an unnamed slough to the Little Bighorn River.

  12. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  13. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  14. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  15. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  16. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  17. Are LMFBR permits unconstitutional. [German Feferal Republic

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, H; Ziegler, E

    1977-12-01

    The August 18, 1977 decision by the Muenster Higher Administrative Court to have the Federal Constitutional Court investigate the constitutionality of permits granted for fast breeder power plants has aroused much attention, both in the FRG and in other countries. This is the first time that the German Atomic Energy Act is being questioned with respect to the separation of powers between legislative and executive authorities and also with respect to the principle of a constitutional state. As a result of their analysis of the first information available about the court decision the authors have some doubts as to whether the views held by the court about the consequences of the development of fast breeder reactors and of the permit granted for the SNR 300 demonstration nuclear power station are essentially correct. In view of the wording of and the official comments on the incriminated Section 7 of the Atomic Energy Act and the large number of subsequent leading decisions by the Federal Diet about fast breeder reactors also the concern about the constitutionality of that reactor line appears to be unfounded.

  18. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  19. AUCTION MECHANISMS FOR IMPLEMENTING TRADABLE NETWORK PERMIT MARKETS

    Science.gov (United States)

    Wada, Kentaro; Akamatsu, Takashi

    This paper proposes a new auction mechanism for implementing the tradable network permit markets. Assuming that each user makes a trip from an origin to a destination along a path in a specific time period, we design an auction mechanism that enables each user to purchase a bundle of permits corresponding to a set of links in the user's preferred path. The objective of the proposed mechanism is to achieve a socially optimal state with minimal revelation of users' private information. In order to achieve this, the mechanism employs an evolutionary approach that has an auction phase and a path capacity adjustment phase, which are repeated on a day-to-day basis. We prove that the proposed mechanism has the following desirable properties: (1) truthful bidding is the dominant strategy for each user and (2) the proposed mechanism converges to an approximate socially optimal state in the sense that the achieved value of the social surplus reaches its maximum value when the number of users is large.

  20. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  1. Taxes, permits, and the diffusion of a new technology

    International Nuclear Information System (INIS)

    Coria, Jessica

    2009-01-01

    This study looks at the effects of the choice between taxes and permits on the pattern of adoption of a new (pollution) emissions abatement technology. It uses a dynamic setting, where the regulator observes the arrival and initial use of the technology and determines the optimal ex post amount of emissions before firms start to adopt the technology. In the model here, the adoption benefits and costs depend on the number of firms that are already using the technology. Thus, each firm decides the optimal date to adopt the technology, considering its benefits and costs, as well as the advantage they will gain over their rivals, producing a sequence of adoption that is ''diffused'' into the industry over time. With this framework, the study shows that when the output demand is elastic, auctioned permits induce an earlier diffusion than taxes. (author)

  2. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  3. Crop Management Effects on the Energy and Carbon Balances of Maize Stover-Based Ethanol Production

    Directory of Open Access Journals (Sweden)

    Prem Woli

    2014-12-01

    Full Text Available This study was conducted to identify the crop management options—the combinations of various cultivars, irrigation amounts, planting dates, and soils—that would maximize the energy sustainability and eco-friendliness of maize (Zea mays L. stover-based ethanol production systems in the Mississippi Delta. Stover yields simulated with CERES-Maize were used to compute net energy value (NEV and carbon credit balance (CCB, the indicators of sustainability and eco-friendliness of ethanol production, respectively, for various scenarios. As the results showed, deeper soils with higher water holding capacities had larger NEV and CCB values. Both NEV and CCB had sigmoid relationships with irrigation amount and planting date and could be maximized by planting the crop during the optimum planting window. Stover yield had positive effects on NEV and CCB, whereas travel distance had negative. The influence of stover yield was larger than that of travel distance, indicating that increasing feedstock yields should be emphasized over reducing travel distance. The NEV and CCB values indicated that stover-based ethanol production in the Mississippi Delta is sustainable and environmentally friendly. The study demonstrated that the energy sustainability and eco-friendliness of maize stover-based ethanol production could be increased with alternative crop management options.

  4. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  5. Interactions of a tradable green certificate market with a tradable permits market

    DEFF Research Database (Denmark)

    Morthorst, Poul Erik

    2001-01-01

    certificate market to promote the development of renewables. If these two instruments are brought into play at the same time, two separate markets with two individual targets will co-exist in a number of countries. With a focus on the green certificate market, this paper discusses how these two markets may...... to achieve this emission reduction. More policy instruments are on hand to pursue this objective. Frequently discussed currently is the establishing of a market for tradable permits for CO2-emissions to achieve emission reductions in the power industry. In parallel with this is the introduction of a green...... interact with each other in international trade. Three different cases are analysed: (1) A green certificate market without any tradable permits scheme, (2) a green certificate market in combination with a tradable permits scheme, based on grandfathering and, finally, (3) a green certificate market...

  6. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  7. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  8. NPDES Draft Permit for City of New Town Water Treatment Plant in North Dakota

    Science.gov (United States)

    Under National Pollutant Discharge Elimination System draft permit number ND0031151, The City of New Town Water Treatment Plant is authorized to discharge from its wastewater treatment facility in Mountrail County, North Dakota.

  9. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  10. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  11. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  12. Analysis of Quadratic Diophantine Equations with Fibonacci Number Solutions

    Science.gov (United States)

    Leyendekkers, J. V.; Shannon, A. G.

    2004-01-01

    An analysis is made of the role of Fibonacci numbers in some quadratic Diophantine equations. A general solution is obtained for finding factors in sums of Fibonacci numbers. Interpretation of the results is facilitated by the use of a modular ring which also permits extension of the analysis.

  13. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  14. Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the Federal Facility Agreement and Consent Order of 1996, as amended February 2008. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: (1) Semiannual inspections of the site using inspection checklists; (2) Photographic documentation; (3) Field note documentation; and (4) Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2007 to June 2008 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C

  15. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  16. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  17. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  18. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  19. 616 Nonradioactive Dangerous Waste Storage Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this storage unit, including the Part A included with this document, is provided at the beginning of the Part A Section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings. The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application (Revision 0) was submitted to the Washington State Department of Ecology and the US Environmental Protection Agency on July 31, 1989. Revision 1, addressing Washington State Department of Ecology review comments made on Revision 0 dated November 21, 1989, and March 23, 1990, was submitted on June 22, 1990. This submittal, Revision 2, addresses Washington State Department of Ecology review comments made on Revision 1, dated June 22, 1990, August 30, 1990, December 18, 1990, and July 8, 1991

  20. UCN gravity spectrometry using neutron interference filters for fundamental investigations in neutron optics

    CERN Document Server

    Bondarenko, I V; Cimmino, A; Geltenbort, P; Frank, A I; Hoghoj, P; Klein, A G; Masalovich, S V; Nosov, V G

    2000-01-01

    A Gravity Spectrometer for ultra-cold neutrons (UCN) using neutron interference filters has been designed and tested. An energy resolution of the order of 6.5 neV was obtained which is good enough for performing a number of neutron-optical experiments proposed in an earlier paper. Experimental tests of the UCN dispersion law are currently in progress.

  1. UCN gravity spectrometry using neutron interference filters for fundamental investigations in neutron optics

    International Nuclear Information System (INIS)

    Bondarenko, I.V.; Balashov, S.N.; Cimmino, A.; Geltenbort, P.; Frank, A.I.; Hoghoj, P.; Klein, A.G.; Masalovich, S.V.; Nosov, V.G.

    2000-01-01

    A Gravity Spectrometer for ultra-cold neutrons (UCN) using neutron interference filters has been designed and tested. An energy resolution of the order of 6.5 neV was obtained which is good enough for performing a number of neutron-optical experiments proposed in an earlier paper. Experimental tests of the UCN dispersion law are currently in progress

  2. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  3. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  4. Consumers’ evaluation of national new energy vehicle policy in China: An analysis based on a four paradigm model

    International Nuclear Information System (INIS)

    Li, Wenbo; Long, Ruyin; Chen, Hong

    2016-01-01

    The Chinese government has issued numerous policies to promote the development and adoption of new energy vehicles (NEVs) to address the problem of excessive energy consumption and environmental pollution. In this study we divided these policies into seven categories: macroscopic, demonstration, subsidization, preferential tax, technical support, industry management, and infrastructure. Since consumers’ opinions affect the policy choices of government, based on questionnaire data we use a four paradigm model to analyze the consumers’ evaluation of each policy in terms of perceptions of importance and satisfaction. The results show that macroscopic policies are perceived to be of high importance and satisfaction, whereas for industry management policies they are perceived to be of low importance and satisfaction. The importance perceptions of preferential tax and demonstration policies are low, whereas perceptions of their satisfaction are high. Perceptions of the importance of subsidization, technical support, and infrastructure policies are high, whereas perceptions of their satisfaction are low. We find that the subsidization, technical support, and infrastructure policies need urgent improvement. Finally, we put forward several suggestions to improve the current policies and increase the consumers’ intention to adopt NEVs. - Highlights: • This study divided Chinese NEV-related policies into seven types. • This study analyzed consumers’ evaluation of NEV-related policies. • Consumers’ evaluations about NEV-related policies were diverse. • Subsidization, technical support, and infrastructure policies need improvement.

  5. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  6. 40 CFR 22.2 - Use of number and gender.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Use of number and gender. 22.2 Section... PERMITS General § 22.2 Use of number and gender. As used in these Consolidated Rules of Practice, words in the singular also include the plural and words in the masculine gender also include the feminine, and...

  7. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  8. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  9. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  10. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  11. The quantum mechanical potential for the prime numbers

    International Nuclear Information System (INIS)

    Mussardo, G.

    1997-12-01

    A simple criterion is derived in order that a number sequence S n is a permitted spectrum of a quantized system. The sequence of the prime numbers fulfills the criterion and the corresponding one-dimensional quantum potential is explicitly computed in a semi-classical approximation. The existence of such a potential implies that the primality testing can in principle be resolved by the sole use of physical laws. (author)

  12. 76 FR 22444 - Privacy Act; System of Records: State-52, Parking Permit and Car Pool Records

    Science.gov (United States)

    2011-04-21

    ...; bureau; office telephone number and e-mail address; and type of parking permit and desired [[Page 22445... authentication and time out function. All Department of State employees and contractors with authorized access...

  13. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    The PUREX Storage Tunnels are a mixed waste storage unit consisting of two underground railroad tunnels: Tunnel Number 1 designated 218-E-14 and Tunnel Number 2 designated 218-E-15. The two tunnels are connected by rail to the PUREX Plant and combine to provide storage space for 48 railroad cars (railcars). The PUREX Storage Tunnels provide a long-term storage location for equipment removed from the PUREX Plant. Transfers into the PUREX Storage Tunnels are made on an as-needed basis. Radioactively contaminated equipment is loaded on railcars and remotely transferred by rail into the PUREX Storage Tunnels. Railcars act as both a transport means and a storage platform for equipment placed into the tunnels. This report consists of part A and part B. Part A reports on amounts and locations of the mixed water. Part B permit application consists of the following: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report

  14. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  15. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  16. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  17. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  18. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  19. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  20. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  1. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  2. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  3. 21 CFR 203.38 - Sample lot or control numbers; labeling of sample units.

    Science.gov (United States)

    2010-04-01

    ... numbers; labeling of sample units. (a) Lot or control number required on drug sample labeling and sample... identifying lot or control number that will permit the tracking of the distribution of each drug sample unit... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Sample lot or control numbers; labeling of sample...

  4. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... special permit Lincoln, NE. to authorize an alternative fire protection system. 11624-M Clean Harbors 49... Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special Permit Applications. SUMMARY: In accordance with the procedures...

  5. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  6. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  7. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  8. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  9. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  10. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  11. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  12. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  13. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  14. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  15. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  16. Life Cycle Assessment of Gasoline and Diesel Produced via Fast Pyrolysis and Hydroprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, D. D.

    2011-03-01

    In this work, a life cycle assessment (LCA) estimating greenhouse gas (GHG) emissions and net energy value (NEV) of the production of gasoline and diesel from forest residues via fast pyrolysis and hydroprocessing, from production of the feedstock to end use of the fuel in a vehicle, is performed. The fast pyrolysis and hydrotreating and hydrocracking processes are based on a Pacific Northwest National Laboratory (PNNL) design report. The LCA results show GHG emissions of 0.142 kg CO2-equiv. per km traveled and NEV of 1.00 MJ per km traveled for a process using grid electricity. Monte Carlo uncertainty analysis shows a range of results, with all values better than those of conventional gasoline in 2005. Results for GHG emissions and NEV of gasoline and diesel from pyrolysis are also reported on a per MJ fuel basis for comparison with ethanol produced via gasification. Although pyrolysis-derived gasoline and diesel have lower GHG emissions and higher NEV than conventional gasoline does in 2005, they underperform ethanol produced via gasification from the same feedstock. GHG emissions for pyrolysis could be lowered further if electricity and hydrogen are produced from biomass instead of from fossil sources.

  17. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  18. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  19. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  20. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  1. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  2. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  3. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  4. Soil and variety effects on energy use and carbon emissions associated with switchgrass-based ethanol production in Mississippi

    Energy Technology Data Exchange (ETDEWEB)

    Woli, Prem; Paz, Joel O.; Baldwin, Brian S.; Lang, David J.; Kiniry, James R.

    2012-06-29

    High biomass production potential, wide adaptability, low input requirement, and low environmental risk make switchgrass an economically and ecologically viable energy crop.The inherent variablity in switchgrass productivity due to variations in soil and variety could affect the sustainability and eco-friendliness of switchgrass-based ethanol production. This study examined the soil and variety effects on these variables. Three locations in Mississippi were selected based on latitude and potential acreage. Using ALMANAC, switchgrass biomass yields were simulated for several scenarios of soils and varities. The simulated yields were fed to IBSAL to compute energy use and CO2 emissions in various operations in the biomass supply From the energy and emissions values, the sustainability and eco-friendliness of ethanol production were determined using net energy value (NEV) and carbon credit balance (CCB) as indicators, respectively. Soil and variety effects on NEV and CCB were analyzed using the Kruskal-Wallis test. Results showed significant differences in NEV and CCB across soils and varieties. Both NEV and CCB increased in the direction of heavier to lighter soils and on the order of north-upland , south-upland, north-lowland, and south-lowland varieties. Only north-upland and south-lowland varieties were significantly significantly different because they were different in both cytotype and ecotype. Gaps between lowland and upland varieties were smaller in a dry year than in a wet year. The NEV and CCB increased in the direction of dry to wet year. From south to north, they decreased for lowland cytotypes but increased for upland cytotypes. Thus, the differences among varieties decreased northwards.

  5. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  6. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  7. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...

  8. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  9. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  10. FAA's Implementation of the Commercial Space Launch Amendments Act of 2004- The Experimental Permit

    Science.gov (United States)

    Repcheck, J. Randall

    2005-12-01

    A number of entrepreneurs are committed to the goal of developing and operating reusable launch vehicles for private human space travel. In order to promote this emerging industry, and to create a clear legal, regulatory, and safety regime, the United States (U.S.) Congress passed the Commercial Space Launch Amendments Act of 2004 (CSLAA). Signed on December 23, 2004 by U.S. President George W. Bush, the CSLAA makes the Federal Aviation Administration (FAA) responsible for regulating human spaceflight. The CSLAA, among other things, establishes an experimental permit regime for developmental reusable suborbital rockets. This paper describes the FAA's approach in developing guidelines for obtaining and maintaining an experimental permit, and describes the core safety elements of those guidelines.

  11. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  12. Annual Waste Minimization Summary Report for the National Nuclear Security Administration Nevada Site Office

    International Nuclear Information System (INIS)

    Alfred J. Karns

    2007-01-01

    This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U. S. Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during CY06. This report was developed in accordance with the requirements of the Nevada Test Site (NTS) Resource Conservation and Recovery Act (RCRA) Permit ((number s ign)NEV HW0021) and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the DOE, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by the NNSA/NSO and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by the NNSA/NSO

  13. Annual Waste Minimization Summary Report Calendar Year 2007

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year (CY) 2007. This report was developed in accordance with the requirements of the Nevada Test Site (NTS) Resource Conservation and Recovery Act (RCRA) Permit (number NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by the NNSA/NSO and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by the NNSA/NSO

  14. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  15. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  16. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  17. Family number non-conservation induced by the super-symmetric mixing of scalar leptons

    International Nuclear Information System (INIS)

    Levine, M.J.S.

    1987-01-01

    We examine a model of supersymmetry with soft breaking terms in the electroweak sector. Explicit mixing among the scalar leptons results in a number of effects, principally non-conservation of lepton family number. Comparison with experiment permits us to place constraints upon the model

  18. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  19. Numerical Investigation of the Primety of Real numbers

    DEFF Research Database (Denmark)

    Jensen, Kristoffer

    2011-01-01

    The Farey sequences can be used [1] to create the Eulers totient function φ(n), by identifying the fractions for number n that did not occur in all Farey sequences up to n-1. This function creates, when divided by n-1, what is here called the Primety measure, which is a measure of how close...... to being a prime number n is. P(n)=φ(n)/(n-1) has maximum 1 for all prime numbers and minimum that decreases non-uniformly with n. Thus P(n) is the Primety function, which permits to designate a value of Primety of a number n. If P(n)==1, then n is a prime. If P(n)

  20. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  1. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  2. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  3. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  4. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  5. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  6. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  7. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  8. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  9. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  10. 50 CFR 21.27 - Special purpose permits.

    Science.gov (United States)

    2010-10-01

    ... certification required by part 13 and makes a sufficient showing of benefit to the migratory bird resource..., salvage, otherwise acquire, transport, or possess migratory birds, their parts, nests, or eggs for any... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose...

  11. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  12. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  13. 40 CFR 74.10 - Roles-EPA and permitting authority.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Roles-EPA and permitting authority. 74... (CONTINUED) SULFUR DIOXIDE OPT-INS Permitting Procedures § 74.10 Roles—EPA and permitting authority. (a... end-of-year compliance, determining reduced utilization, approving thermal energy transfer and...

  14. 40 CFR 52.2184 - Operating permits for minor sources.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52... permits for minor sources. Emission limitations and related provisions established in South Dakota minor... right to deem permit conditions not federally enforceable. Such a determination will be made according...

  15. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  16. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  17. 78 FR 20316 - Final Issuance of General NPDES Permits (GP) for Small Suction Dredges in Idaho

    Science.gov (United States)

    2013-04-04

    ... System (NPDES) General Permit (IDG-37-0000) to placer mining operations in Idaho for small suction... Small Suction Dredges in Idaho AGENCY: Environmental Protection Agency, Region 10. ACTION: Final notice... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  18. 29 CFR 2.12 - Audiovisual coverage permitted.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audiovisual coverage permitted. 2.12 Section 2.12 Labor Office of the Secretary of Labor GENERAL REGULATIONS Audiovisual Coverage of Administrative Hearings § 2.12 Audiovisual coverage permitted. The following are the types of hearings where the Department...

  19. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  20. 30 CFR 280.27 - When may MMS cancel my permit?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When may MMS cancel my permit? 280.27 Section... Part Interrupted Activities § 280.27 When may MMS cancel my permit? The RD may cancel a permit at any time. (a) If we cancel your permit, the RD will advise you by certified or registered mail 30 days...

  1. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  2. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  3. 33 CFR 325.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... process. Whenever the district engineer becomes aware of planning for work which may require a DA permit... in the basic timing sequence used by the Corps of Engineers in processing applications for DA permits.... Upon receipt of such request, the district engineer will assure the conduct of an orderly process which...

  4. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  5. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  6. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  7. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  8. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  9. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    International Nuclear Information System (INIS)

    Coenenberg, J.G.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, 'operating' treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating

  10. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    Energy Technology Data Exchange (ETDEWEB)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating

  11. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... purpose of enhancing the species' survival. Permit No. TE-99477A Applicant: Benjamin S. Wallace, Fairfield...-99473A Applicant: Joseph D. Henry, San Diego, California The applicant requests a permit to take (capture...

  12. 7 CFR 330.203 - Action on applications for permits to move plant pests; form of and conditions in permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Action on applications for permits to move plant pests... PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.203 Action on applications for permits to move plant pests; form of and conditions in...

  13. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  14. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  15. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  16. 43 CFR 13.4 - Terms of permit.

    Science.gov (United States)

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  17. COMPARATIVE EXAMINATION OF TERMS OF TURKISH ARMY ORGANIZATION IN MUHÂKEMETÜ’L-LÜGATEYN MUHÂKEMETÜ’L-LÜGATEYN’DEKİ TÜRK ORDU TEŞKİLATINA AİT TERİMLERİN KARŞILAŞTIRMALI İNCELEMESİ

    Directory of Open Access Journals (Sweden)

    Oktay BERBER

    2010-07-01

    Full Text Available In his work called Muhâkemetü’l-Lügateyn prepared with the goal of proving the superiority of Turkish to Farsi, Ali Şîr Nevâyî has conveyed the language particularities of Turkish via showing evidences. Viewed from this angle, it’s a kind of grammer book, and another important aspect, contained valuable informations about Turkish culture. Because Nevâyî uses a lot of terms blended within the social, cultural, economic and political life of Turks while listing the evidences serving his purpose to edit this work. In our study, starting with these terms employed annotatively by Ali Şîr Nevâyî, eighteen concepts included within Turkish army organization and equivalents of these concepts in the antecedent and subsequent periods shall be included Ali Şîr Nevâyî, Türkçenin Farsçaya üstünlüğünü ispatlamak gayesiyle hazırladığı Muhâkemetü’l-Lügateyn adlı eserinde, Türkçeye ait dil hususiyetlerini deliller göstererek aktarmıştır. Bu açıdan bir çeşit dil bilgisi kitabı olarak önem arz eden eserin, bir başka önemli yanı, Türk kültürü hakkında değerli bilgileri içermesidir. Çünkü Nevâyî, eseri hazırlama amacına hizmet eden delilleri sıralarken, Türklerin sosyal, kültürel, ekonomik ve siyasal yaşantısı içerisinde harmanlanmış pek çok terimi kullanmıştır. Çalışmamızda Ali Şîr Nevâyî’nin açıklamalı olarak kullandığı bu terimlerden yola çıkarak, Türk ordu teşkilatı içerisinde yer alan on sekiz kavrama ve bu kavramların daha önceki ve sonraki dönemlerdeki karşılıklarına yer verilecektir.

  18. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  19. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  20. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  1. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  2. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  3. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  4. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  5. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  6. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  7. 25 CFR 166.219 - How do I acquire a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire a permit through negotiation? 166.219 Section 166.219 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.219 How do I acquire a permit through negotiation? (a) Permits may be negotiated and granted by th...

  8. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  9. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) section 270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below

  10. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  11. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  12. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  13. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  14. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  15. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  16. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  17. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  18. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  19. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  20. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  1. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  2. Multiple estimates of effective population size for monitoring a long-lived vertebrate: An application to Yellowstone grizzly bears

    Science.gov (United States)

    Kamath, Pauline L.; Haroldson, Mark A.; Luikart, Gordon; Paetkau, David; Whitman, Craig L.; van Manen, Frank T.

    2015-01-01

    Effective population size (Ne) is a key parameter for monitoring the genetic health of threatened populations because it reflects a population's evolutionary potential and risk of extinction due to genetic stochasticity. However, its application to wildlife monitoring has been limited because it is difficult to measure in natural populations. The isolated and well-studied population of grizzly bears (Ursus arctos) in the Greater Yellowstone Ecosystem provides a rare opportunity to examine the usefulness of different Ne estimators for monitoring. We genotyped 729 Yellowstone grizzly bears using 20 microsatellites and applied three single-sample estimators to examine contemporary trends in generation interval (GI), effective number of breeders (Nb) and Ne during 1982–2007. We also used multisample methods to estimate variance (NeV) and inbreeding Ne (NeI). Single-sample estimates revealed positive trajectories, with over a fourfold increase in Ne (≈100 to 450) and near doubling of the GI (≈8 to 14) from the 1980s to 2000s. NeV (240–319) and NeI (256) were comparable with the harmonic mean single-sample Ne (213) over the time period. Reanalysing historical data, we found NeV increased from ≈80 in the 1910s–1960s to ≈280 in the contemporary population. The estimated ratio of effective to total census size (Ne/Nc) was stable and high (0.42–0.66) compared to previous brown bear studies. These results support independent demographic evidence for Yellowstone grizzly bear population growth since the 1980s. They further demonstrate how genetic monitoring of Ne can complement demographic-based monitoring of Nc and vital rates, providing a valuable tool for wildlife managers.

  3. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  4. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...... to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices isanalysed. To analyse the connection between CO_2 permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat...

  5. 78 FR 57410 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  6. Automated flow cytometric analysis across large numbers of samples and cell types.

    Science.gov (United States)

    Chen, Xiaoyi; Hasan, Milena; Libri, Valentina; Urrutia, Alejandra; Beitz, Benoît; Rouilly, Vincent; Duffy, Darragh; Patin, Étienne; Chalmond, Bernard; Rogge, Lars; Quintana-Murci, Lluis; Albert, Matthew L; Schwikowski, Benno

    2015-04-01

    Multi-parametric flow cytometry is a key technology for characterization of immune cell phenotypes. However, robust high-dimensional post-analytic strategies for automated data analysis in large numbers of donors are still lacking. Here, we report a computational pipeline, called FlowGM, which minimizes operator input, is insensitive to compensation settings, and can be adapted to different analytic panels. A Gaussian Mixture Model (GMM)-based approach was utilized for initial clustering, with the number of clusters determined using Bayesian Information Criterion. Meta-clustering in a reference donor permitted automated identification of 24 cell types across four panels. Cluster labels were integrated into FCS files, thus permitting comparisons to manual gating. Cell numbers and coefficient of variation (CV) were similar between FlowGM and conventional gating for lymphocyte populations, but notably FlowGM provided improved discrimination of "hard-to-gate" monocyte and dendritic cell (DC) subsets. FlowGM thus provides rapid high-dimensional analysis of cell phenotypes and is amenable to cohort studies. Copyright © 2015. Published by Elsevier Inc.

  7. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State issuance of Phase II permits. 72.73 Section 72.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.73 State issuance of Phase II permits...

  8. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  9. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  10. AIR PERMIT COMPLIANCE FOR WASTE RETRIEVAL OEPRATIONS INVOLVING MULTI-UNIT EMISSIONS

    International Nuclear Information System (INIS)

    SIMMONS FM

    2007-01-01

    Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and .contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits

  11. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  12. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  13. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  14. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...: EA Engineering, Science, and Technology, Lewisville, Texas. Applicant requests a new permit for... atricapilla) within Texas. Permit TE-37047A Applicant: Sea World Parks and Entertainment, San Antonio, Texas...

  15. 50 CFR 216.41 - Permits for scientific research and enhancement.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Permits for scientific research and... AND IMPORTING OF MARINE MAMMALS Special Exceptions § 216.41 Permits for scientific research and enhancement. In addition to the requirements under §§ 216.33 through 216.38, permits for scientific research...

  16. The Clean-Development Mechanism, stochastic permit prices and energy investments

    International Nuclear Information System (INIS)

    Hieronymi, Philipp; Schüller, David

    2015-01-01

    We analyze the impact on energy investments stemming from different emission permit classes, by considering permits that are allocated inside the European Emission Trading Scheme and secondary Certified Emission Reduction (sCER) permits originating from the Clean Development Mechanism. One price taking firm which is subject to emission regulation has the choice to invest in gas or wind power plant. The firm faces uncertainty regarding stochastically evolving permit prices, while it receives a premium on the electricity price for wind energy. As a first step, we determine the value of the option to invest into a gas power plant over time. Then, we calculate the investment probability of a gas power investment in a range of policy scenarios. We find that allowing the usage of sCER permits in the present policy framework has a positive impact on gas power investment. Decoupling the price processes has a similar effect. If the quota of sCER permits is doubled, the decrease in the investment probability for wind power is large. We carry out sensitivity tests for different parameter values, and find that investment behavior changes significantly with differing interest rates, the wind energy premium and volatility. - Highlights: • We model the impact of two CO 2 permit classes on energy investments. • We present a real-options framework accounting for uncertainty. • Clean Development Mechanism permits have a negative influence on investment into renewable energy. • Interest rate and volatility values have a strong impact on the results

  17. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: In accordance with the requirements of the...

  18. 19 CFR 12.99 - Procedures for permitted entry.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Procedures for permitted entry. 12.99 Section 12.99 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY SPECIAL CLASSES OF MERCHANDISE Switchblade Knives § 12.99 Procedures for permitted entry...

  19. 40 CFR 60.4121 - Submission of Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Submission of Hg budget permit... Times for Coal-Fired Electric Steam Generating Units Permits § 60.4121 Submission of Hg budget permit applications. (a) Duty to apply. The Hg designated representative of any Hg Budget source required to have a...

  20. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  1. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  2. Pricing emission permits in the absence of abatement

    International Nuclear Information System (INIS)

    Hintermann, Beat

    2012-01-01

    If emissions are stochastic and firms are unable to control them through abatement, the cap in a permit market may be exceeded, or not be reached. I derive a binary options pricing formula that expresses the permit price as a function of the penalty for noncompliance and the probability of an exceeded cap under the assumption of no abatement. I apply my model to the EU ETS, where the rapid introduction of the market made it difficult for firms to adjust their production technology in time for the first phase. The model fits the data well, implying that the permit price may have been driven by firms hedging against stochastic emissions.

  3. 76 FR 74070 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2011-11-30

    ... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Dated: November 21, 2011. Lynn M. Lewis...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  4. 78 FR 9415 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-02-08

    ...). Authority: The authority for this notice is the Endangered Species Act of 1973, as amended (16 U.S.C. 1531...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  5. 76 FR 39368 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-07-06

    ... promulgating migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or other...). Background In response to public interest in the use of trained raptors to haze (scare) depredating and other...

  6. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  7. 9 CFR 73.10 - Permitted dips; substances allowed.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Permitted dips; substances allowed. 73.10 Section 73.10 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT... flowers of sulphur or sulphur flour to 100 gallons of water; or a specifically permitted proprietary brand...

  8. 29 CFR 1910.146 - Permit-required confined spaces.

    Science.gov (United States)

    2010-07-01

    ... any failure of hazard control or monitoring equipment) or event internal or external to the permit... could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and... complying with the permit space requirements that apply to all employers, each contractor who is retained to...

  9. 32 CFR 935.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ... shall be issued under other authority that is inconsistent with this part. The Commander may issue.... (b) To the extent it is not inconsistent with this part, any permit or registration issued pursuant...

  10. 50 CFR 660.707 - Permits.

    Science.gov (United States)

    2010-10-01

    ... or downloaded from the Southwest Region home page (http://swr.nmfs.noaa.gov/permits.htm) to apply for... the vessel is fishing for, taking, retaining, possessing, or landing HMS shoreward of the outer...

  11. 40 CFR 96.85 - NOX Budget opt-in permit contents.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget opt-in permit contents. 96... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Individual Unit Opt-ins § 96.85 NOX Budget opt-in permit contents. (a) Each NOX Budget opt-in permit...

  12. 40 CFR 97.85 - NOX Budget opt-in permit contents.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget opt-in permit contents. 97... (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Individual Unit Opt-ins. § 97.85 NOX Budget opt-in permit contents. (a) Each NOX Budget opt-in permit will contain all elements...

  13. Les nanovésicules extracellulaires sécrétées par les CSMs et les nanovésicules de synthèse issues d’agro-ressources : de leur caractérisation à leur utilisation en ingénierie tissulaire

    OpenAIRE

    Dostert , Gabriel

    2017-01-01

    Nanoscale extracellular vesicles (nEVs) derived from mesenchymal stem cells (MSCs) and synthetic nanovesicles are at the centre of many research studies for the development of new therapeutic strategies in regenerative medicine. A standardized method was used to isolate nEVs from conditioned media of CSMs and to characterize them. We focused on their size with a range of 30 to 150 nm and the presence of some of their membrane markers (CD9, CD63 and CD81). During this work, two isolation metho...

  14. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... modify the special permit Town, South Africa. 178.277(b)(1). to increase the water capacity from 17000... prevent leakage during transportation. (mode 1). 15667-N Volga Dnepr--UNIQUE AIR 49 CFR 172.101 Column To...). NEW SPECIAL PERMIT WITHDRAWN 15494-N Johnson Controls Battery 49 CFR 173.159 To authorize the Group...

  15. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  16. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  17. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  18. 46 CFR 78.40-10 - No smoking permitted.

    Science.gov (United States)

    2010-10-01

    ... § 78.40-10 No smoking permitted. (a) The master shall have appropriate “No Smoking” signs posted and shall take all necessary precautions to prevent smoking or carrying of lighted or smoldering cigars... 46 Shipping 3 2010-10-01 2010-10-01 false No smoking permitted. 78.40-10 Section 78.40-10 Shipping...

  19. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  20. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  1. Quantifying the CO{sub 2} permit price sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Gruell, Georg; Kiesel, Ruediger [Duisburg-Essen Univ., Essen (Germany). Inst. of Energy Trading and Financial Services

    2012-06-15

    Equilibrium models have been widely used in the literature with the aim of showing theoretical properties of emissions trading schemes. This paper applies equilibrium models to empirically study permit prices and to quantify the permit price sensitivity. In particular, we demonstrate that emission trading schemes both with and without banking are inherently prone to price jumps. (orig.)

  2. 50 CFR 697.24 - Exempted waters for Maine State American lobster permits.

    Science.gov (United States)

    2010-10-01

    ... lobster permits. 697.24 Section 697.24 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... lobster permits. A person or vessel holding a valid permit or license issued by the State of Maine that lawfully permits that person to engage in commercial fishing for American lobster may, with the approval of...

  3. Issues in third party attacks on SMCRA permits. [USA - Indiana

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, G.D. Jr. (Ice Miller Donadio Ryan, Indianapolis, IN (USA))

    1990-01-01

    Legal issues which have occurred in third party attacks on SMCRA (Surface Mining Control and Reclamation Act) permit, mainly in Indiana, are discussed. Problems that can occur with the interrelationship of common law nuisance/injunction actions, the permit process, enforcement proceedings and collateral estoppel from administrative agency action, as well as finality issues in the permit process as related to other provisions of SMCRA. 37 refs.

  4. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  5. 76 FR 35235 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-06-16

    ... chub (Gila intermedia), Gila topminnow (Poeciliopsis occidentalis occidentalis), humpback chub (Gila... intermedia) within Arizona. Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant...), and Gila chub (Gila intermedia) within Arizona. Permit TE-118414 Applicant: Cherokee Nation, Tahlequah...

  6. Diamondlike carbon can replace beryllium in physics with ultracold neutrons

    International Nuclear Information System (INIS)

    Atchison, F.; Blau, B.; Daum, M.; Fierlinger, P.; Foelske, A.; Geltenbort, P.; Gupta, M.; Henneck, R.; Heule, S.; Kasprzak, M.; Kuzniak, M.; Kirch, K.; Meier, M.; Pichlmaier, A.; Plonka, Ch.; Reiser, R.; Theiler, B.; Zimmer, O.; Zsigmond, G.

    2006-01-01

    To complete our study of ultracold neutron (UCN) storage-vessel coatings, we have measured the Fermi potential for neutrons on diamondlike carbon coatings produced by laser induced vacuum arc deposition. A sample with an sp 3 content of 0.45, measured using, for the first time, neutron transmission had a Fermi potential of (249+/-14)neV. A second sample with an sp 3 fraction of 0.67, measured using cold neutron reflectometry, gave (271+/-13)neV. These values complete the demonstration that there is a viable alternative to Be in UCN physics

  7. 21 CFR 1312.13 - Issuance of import permit.

    Science.gov (United States)

    2010-04-01

    ... drug listed in Schedule III, IV, or V if he finds: (1) That the substance is crude opium, poppy straw... shall render it void and of no effect. Permits are not transferable. Each copy of the permit shall have... the Act (21 U.S.C. 952(a)(1) or (a)(2)(A)), the importation of approved narcotic raw material (opium...

  8. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  9. The European Union's potential for strategic emissions trading through permit sales contracts

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Hagem, Cathrine

    2011-01-01

    Strategic market behavior by permit sellers will harm the European Union (EU) as it is expected to become a large net buyer of permits in a follow-up agreement to the Kyoto Protocol. In this paper, we explore how the EU could benefit from making permit trade agreements with non-EU countries. These trade agreements involve permit sales requirement, complemented by a financial transfer from the EU to the other contract party. Such agreements would enable the EU to act strategically in the permit market on behalf of its member states, although each member state is assumed to behave as a price taker in the permit market. Using a stylized numerical simulation model, we show that an appropriately designed permit trade agreement between the EU and China could significantly cut the EU's total compliance cost. This result is robust for a wide range of parameterizations of the simulation model. (author)

  10. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  11. 75 FR 67765 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-11-03

    ... collect leaf tissue and seeds from the following endangered plants: South Texas ambrosia (Ambrosia... transportation, at the Miller Park Zoo. Permit TE-24625A Applicant: Wendy Leonard, San Antonio, Texas. Applicant...-cheeked warbler (Dendroica chrysoparia) and black-capped vireo (Vireo atricapilla) within Texas. Permit TE...

  12. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... and recovery purposes to conduct pollination on 36 individual adult Arizona hedgehog cactus.... Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant requests an amendment to a... Aquarium, Grapevine, Texas. Permit TE-92366A Applicant: Kimley-Horn and Associates, Inc., Dallas, Texas...

  13. 40 CFR 76.9 - Permit application and compliance plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Permit application and compliance plans. 76.9 Section 76.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.9 Permit application and...

  14. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  15. 25 CFR 166.223 - Can I use a permit as collateral for a loan?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can I use a permit as collateral for a loan? 166.223... PERMITS Permit Requirements Permit (leasehold) Mortgage § 166.223 Can I use a permit as collateral for a loan? We may approve a permit containing a provision that authorizes the permittee to encumber the...

  16. 25 CFR 161.301 - What will a grazing permit contain?

    Science.gov (United States)

    2010-04-01

    ... permits will contain the following provisions: (1) Name of permit holder; (2) Range management plan...) Animal identification requirements (i.e., brand, microchip, freeze brand, earmark, tattoo, etc.); (6...

  17. 77 FR 71033 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2012-11-28

    ... Lincoln, NE. permit to authorize an alternative fire protection system. 15461-M Kidde Products High 49 CFR... Systems Inc. 49 CFR 172.200, To reissue the special Plymouth, MI. 177.834. permit originally issued on an... Applications for Modification of Special Permit AGENCY: Office of Hazardous Materials Safety, Pipeline and...

  18. Permitted and forbidden sets in symmetric threshold-linear networks.

    Science.gov (United States)

    Hahnloser, Richard H R; Seung, H Sebastian; Slotine, Jean-Jacques

    2003-03-01

    The richness and complexity of recurrent cortical circuits is an inexhaustible source of inspiration for thinking about high-level biological computation. In past theoretical studies, constraints on the synaptic connection patterns of threshold-linear networks were found that guaranteed bounded network dynamics, convergence to attractive fixed points, and multistability, all fundamental aspects of cortical information processing. However, these conditions were only sufficient, and it remained unclear which were the minimal (necessary) conditions for convergence and multistability. We show that symmetric threshold-linear networks converge to a set of attractive fixed points if and only if the network matrix is copositive. Furthermore, the set of attractive fixed points is nonconnected (the network is multiattractive) if and only if the network matrix is not positive semidefinite. There are permitted sets of neurons that can be coactive at a stable steady state and forbidden sets that cannot. Permitted sets are clustered in the sense that subsets of permitted sets are permitted and supersets of forbidden sets are forbidden. By viewing permitted sets as memories stored in the synaptic connections, we provide a formulation of long-term memory that is more general than the traditional perspective of fixed-point attractor networks. There is a close correspondence between threshold-linear networks and networks defined by the generalized Lotka-Volterra equations.

  19. Multiple estimates of effective population size for monitoring a long-lived vertebrate: an application to Yellowstone grizzly bears.

    Science.gov (United States)

    Kamath, Pauline L; Haroldson, Mark A; Luikart, Gordon; Paetkau, David; Whitman, Craig; van Manen, Frank T

    2015-11-01

    Effective population size (N(e)) is a key parameter for monitoring the genetic health of threatened populations because it reflects a population's evolutionary potential and risk of extinction due to genetic stochasticity. However, its application to wildlife monitoring has been limited because it is difficult to measure in natural populations. The isolated and well-studied population of grizzly bears (Ursus arctos) in the Greater Yellowstone Ecosystem provides a rare opportunity to examine the usefulness of different N(e) estimators for monitoring. We genotyped 729 Yellowstone grizzly bears using 20 microsatellites and applied three single-sample estimators to examine contemporary trends in generation interval (GI), effective number of breeders (N(b)) and N(e) during 1982-2007. We also used multisample methods to estimate variance (N(eV)) and inbreeding N(e) (N(eI)). Single-sample estimates revealed positive trajectories, with over a fourfold increase in N(e) (≈100 to 450) and near doubling of the GI (≈8 to 14) from the 1980s to 2000s. N(eV) (240-319) and N(eI) (256) were comparable with the harmonic mean single-sample N(e) (213) over the time period. Reanalysing historical data, we found N(eV) increased from ≈80 in the 1910s-1960s to ≈280 in the contemporary population. The estimated ratio of effective to total census size (N(e) /N(c)) was stable and high (0.42-0.66) compared to previous brown bear studies. These results support independent demographic evidence for Yellowstone grizzly bear population growth since the 1980s. They further demonstrate how genetic monitoring of N(e) can complement demographic-based monitoring of N(c) and vital rates, providing a valuable tool for wildlife managers. © 2015 John Wiley & Sons Ltd.

  20. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Science.gov (United States)

    2010-08-06

    ... Presidential Permit No. PP-22, as amended, to BC Hydro. The application requested that the Department of Energy... the transmission of electric energy between the United States and a foreign country is prohibited in... law pursuant to British Columbia's Clean Energy Act. Since restructuring of the electric power...

  1. 40 CFR 96.24 - Effective date of initial NOX Budget permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Effective date of initial NOX Budget... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Permits § 96.24 Effective date of initial NOX Budget permit. The initial NOX Budget permit...

  2. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-10-12

    ... from Helianthus paradoxus (Pecos sunflower) from plants in Texas. Permit TE-829761 Applicant: Bureau of... for endangered plant species, and 50 CFR 17.72 for threatened plant species. Applications Available...: Texas A & M University, Galveston, Texas. Applicant requests a new permit for husbandry and holding of...

  3. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  4. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  5. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  6. Permit issued for expansion of the Gronau uranium enrichment plant

    International Nuclear Information System (INIS)

    2005-01-01

    Over the next few years, the Gronau Uranium Enrichment Plant (UAG) will be able to raise its capacity in steps from 1 800 tonnes to 4 500 tonnes SWU per annum. This development in steps depends on the extent to which demand on the world market can be turned into contracts for Urenco. After a procedure taking more than six years to complete, Urenco Deutschland GmbH was issued the required permit by the North Rhine-Westphalian State Ministry for Transport, Energy, and Planning on February 14 this year. The permit was preceded by the drafting and examination of two safety reports of several hundred pages each, and of over 1 000 detailed documents. The application documents were examined by a large number of expert consultants and public authorities from all over Germany acting on behalf of the nuclear licensing authority. Urenco Ltd. sells enrichment services worldwide, at present holding a share of approx. 19% of the world market for uranium separative work. Although this world market is not going to grow for a foreseeable period of time, Urenco is expanding its capacities. This is based on the latest centrifuge technology characterized by extremely low power consumption and high availability. It replaces diffusion technology, which currently holds a share of approx. 40% of the world market. (orig.)

  7. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  8. 25 CFR 91.7 - Permits to occupy land for dwelling purposes.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Permits to occupy land for dwelling purposes. 91.7... INDIAN VILLAGES, OSAGE RESERVATION, OKLAHOMA § 91.7 Permits to occupy land for dwelling purposes. The issuance of permits for the use of land for dwelling purposes within any village reserve described in § 91...

  9. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  10. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  11. 75 FR 52965 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-08-30

    ... appointment only, during normal business hours at the U.S. Fish and Wildlife Service, 500 Gold Ave., SW., Room... permit for research and recovery purposes to conduct presence/absence surveys for American burying beetle...., Round Rock, Texas. Applicant requests an amendment to a current permit for research and recovery...

  12. 48 CFR 52.247-2 - Permits, Authorities, or Franchises.

    Science.gov (United States)

    2010-10-01

    ... Franchises. 52.247-2 Section 52.247-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....247-2 Permits, Authorities, or Franchises. As prescribed in 47.207-1(a), insert the following clause: Permits, Authorities, or Franchises (JAN 1997) (a) The offeror does □, does not □, hold authorization from...

  13. 36 CFR 228.54 - Single entry sales or permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Single entry sales or permits... MINERALS Disposal of Mineral Materials General Provisions § 228.54 Single entry sales or permits. The... plan which describes operating procedures and reclamation measures, unless the requirement is waived by...

  14. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  15. 78 FR 14110 - Emergency Issuance of Endangered Species Permit

    Science.gov (United States)

    2013-03-04

    ... issued an endangered species permit to address emergency veterinary care for an injured green sea turtle...] Emergency Issuance of Endangered Species Permit AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered and threatened species under section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended...

  16. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  17. Nuclear installations operated without the required permits: the policy pursued in the Netherlands

    International Nuclear Information System (INIS)

    Huygen, A.

    1994-01-01

    The authoress presents two topical cases from the Netherlands where two nuclear installations are allowed to continue operation by a joint decision of the government and the courts, although the legal operating permits have been declared void by a government senate. The legal basis constructed for this approach allowing plant operation to continue for a limited number of years is an explicit statement by the government to tolerate such procedure. The installations are the Bodeward nuclear power station with a BWR and the Almelo URENCO uranium enrichment facility. (orig./HSCH) [de

  18. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  19. 224-T Transuranic Waste Storage and Assay Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-01-01

    Westinghouse Hanford Company is a major contractor to the US Department of Energy Richland Field Office and serves as cooperator of the 224-T Transuranic Waste Storage and Assay Facility, the storage unit addressed in this permit application. At the time of submission of this portion of the Hanford Facility. Dangerous Waste Permit Application covering the 224-T Transuranic Waste Storage and Assay Facility, many issues identified in comments to the draft Hanford Facility Dangerous Waste Permit remain unresolved. This permit application reflects the positions taken by the US Department of Energy, Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application (Revision 0) consists of both a Part A and Part B permit application. An explanation of the Part A revisions associated with this unit, including the Part A revision currently in effect, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application contains information current as of March 1, 1992

  20. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  1. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  2. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  3. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  4. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  5. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  6. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  7. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  8. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  9. Auctioning emission permits in a leader-follower setting

    OpenAIRE

    Alvarez, Francisco; André, Francisco J.

    2015-01-01

    We analise emission permit auctions under leader-follower competition when the leader bids strategically and the follower acts as price-taker both at the auction and the secondary market. We obtain linear equilibrium bidding strategies for both firms and a unique equilibrium of the auction, which is optimal ex-post for the leader. Under specific distributional assumptions we conclude that the auction always awards less permits to the leader than the cost-effective amount. Our central result i...

  10. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  11. Nevşehir-Niğde Yöresinde Yetiştirilen Bazı Patates Çeşitlerinin Dondurulmuş Parmak Patatese İşlemeye Uygunluğu Üzerine Araştırma

    Directory of Open Access Journals (Sweden)

    Mustafa Didin

    2015-02-01

    Full Text Available Bölgede yetiştirilen patates çeşitlerinin dondurulmuş parmak patatese işlemeye uygunluğunun belirlenmesinin amaçlandığı bu araştırmada materyal olarak Agria, Emie, Fienna, Granula, Hermes, Lady Rosetta Panda, :0uinta, Russet Burbang, Satuma, Tomensa ve Wangog çeşitleri kullanılmıştır. Çeşitler Nevşehir ili ve ilçelerinde patates tarımı ile ilgili faaliyet gösteren değişik firmalardan temin edilmiştir. Araştırmada kullanılacak patatesler, yıkama işlemine tabi tutulduktan sonra 80 °C'deki % 10'luk NaOH çözeltisine 2 dakika süre de daldırarak kabukları soyulmuştur. Daha sonra %0.5'lik sitrik asit çözeltisinde bekletilerek kalıntı alkali giderilmiştir. Kabuk soyma işleminden sonra kesiti 9X9 mm olan şeritler halinde dilimlenen örnekler dondurulmuş parmak patatese işlenmiştir. Çalışmada doğrudan kızartma ve haşladıktan sonra kızartma olmak üzere 2 ayrı yöntem kullanılmıştır Doğrudan kızartmada dilim­lenmiş patateslerin yüzey suyunun giderilmesi sağlandıktan sonra 170 °C'de 2 dakika süre de ön kızartma işlemi uygulanmıştır.

  12. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  13. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  14. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  15. Hanford facility dangerous waste Part A, Form 3 and Part B permit application documentation, Central Waste Complex (WA7890008967)(TSD: TS-2-4)

    Energy Technology Data Exchange (ETDEWEB)

    Saueressig, D.G.

    1998-05-20

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998.

  16. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  17. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Science.gov (United States)

    2010-07-01

    ... application may be given in lieu of a new application, provided the scope of work does not change... MISCELLANEOUS RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  18. 36 CFR 13.932 - How many permits will be issued each summer?

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false How many permits will be issued each summer? 13.932 Section 13.932 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Preserve Motor Vehicle Permits § 13.932 How many permits will be issued each summer? The superintendent is...

  19. 49 CFR 176.99 - Permit requirements for certain hazardous materials.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Permit requirements for certain hazardous materials. 176.99 Section 176.99 Transportation Other Regulations Relating to Transportation PIPELINE AND... CARRIAGE BY VESSEL Special Requirements for Barges § 176.99 Permit requirements for certain hazardous...

  20. 40 CFR 233.36 - Modification, suspension or revocation of permits.

    Science.gov (United States)

    2010-07-01

    ... has been submitted to the Director; (iv) Provide for minor modification of project plans that do not... appropriately regulated by individual permits; (4) Circumstances relating to the authorized activity have... cessation of any discharge controlled by the permit; (5) Any significant information relating to the...

  1. Family number non-conservation induced by the supersymmetric mixing of scalar leptons

    International Nuclear Information System (INIS)

    Levine, M.J.S.

    1987-08-01

    The most egregious aspect of (N = 1) supersymmetric theories is that each particle state is accompanied by a 'super-partner', a state with identical quantum numbers save that it differs in spin by one half unit. For the leptons these are scalars and are called ''sleptons'', or scalar leptons. These consist of the charged sleptons (selectron, smuon, stau) and the scalar neutrinos ('sneutrinos'). We examine a model of supersymmetry with soft breaking terms in the electroweak sector. Explicit mixing among the scalar leptons results in a number of effects, principally non-conservation of lepton family number. Comparison with experiment permits us to place constraints upon the model. 49 refs., 12 figs

  2. Enforcing Transferable Permit Systems in the Presence of Market Power

    International Nuclear Information System (INIS)

    Chavez, C.A.; Stanlund, J.K.

    2003-01-01

    We derive an enforcement strategy for a transferable permit system in the presence of market power that achieves complete compliance in a cost-effective manner. We show that the presence of a firm with market influence makes designing an enforcement strategy more difficult than enforcing a perfectly competitive system. We also re-consider the suggestion that a firm with market influence should be allocated permits so that it chooses to not participate in the permit market. When enforcement and its costs are taken into account, that suggestion does not hold except in a very special case

  3. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  4. Hanford facility dangerous waste permit application, general information portion. Revision 3

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy's contractors are identified as ''co-operators'' and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ''operator'' elsewhere in the application is not meant to conflict with the contractors' designation as co-operators but rather is based on the contractors' contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  5. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  6. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  7. 9 CFR 82.24 - Other interstate movements and special permits.

    Science.gov (United States)

    2010-01-01

    ... issued, and the special conditions under which the interstate movement, or cleaning and disinfection, may...; and (iv) The reason for the interstate movement. (2) For cleaning and disinfection, the special permit... prescribed by this subpart. A special permit is required for the disinfection of vehicles, premises, cages...

  8. 40 CFR 70.8 - Permit review by EPA and affected States.

    Science.gov (United States)

    2010-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements... PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.8 Permit review by EPA and affected States. (a...

  9. Market Power with Interdependent Demand. Sale of Emission Permits and Natural Gas from Russia

    International Nuclear Information System (INIS)

    Hagem, C.; Kallbekken, S.; Westskog, H.; Maestad, O.

    2006-01-01

    With implementation of the Kyoto Protocol, Russia will most likely be able to exert market power in the emission permit market. But, as Russia is also a big exporter of fossil fuels, the incentives to boost the permit price may be weak. However, a significant share of Russia's fossil fuel exports is natural gas. If a high permit price boosts the demand for natural gas through substitution from more polluting fuels and thus increase gas profits, this may increase the incentives to exert monopoly power in the permit market. Moreover, a large fossil fuel exporter may use its market position to influence the effective demand for permits. Hence, the relationship between permit income and fossil fuels exports runs in both directions. In this article, we explore the interdependence between the revenues from permit and fossil fuel exports both theoretically and numerically. A computable general equilibrium model suggests the fact that Russia as a big gas exporter has small effect on the incentives to exert monopoly power in the permit market. Moreover, Russia's monopoly power in the permit market has a small, but non-negligible impact on the optimal level of Russian gas exports. (author)

  10. A public firm on a market for tradable emission permits. A case study for the Netherlands

    International Nuclear Information System (INIS)

    Koster, J.M.M.

    2001-01-01

    In chapters 2 and 3 a survey is given of the literature concerning imperfections in a market for tradable emission permits. Chapter 2 concentrates on profit maximizing firms functioning on unregulated output markets, while Chapter 3 focuses entirely on the inefficiencies arising from participation in the tradable permit scheme of firms that do not minimize their costs. From the survey of the literature in chapters 2 and 3, it appears that researchers have neglected environmental decision making in public firms of the type that have dominated the utility sectors in Europe during the twentieth century. Although their numbers have been reduced by the deregulation and privatization wave in the past two decades, the public firm has certainly not disappeared from the stage in Europe. In chapter 6 we shall fill this gap in the literature and develop a model of decision making in the public firm that can be applied to its decision on pollution abatement, in particular in case a scheme of tradable emission permits is the instrument of environmental policy. Electricity is one of the traditional utility sectors where the public firm was the dominant form of organization. In order to test the applicability of our public firm model we will use it to simulate the decisions of the Dutch electricity production sector in chapters 8 and 9. The chapters 4 and 5 prepare the ground by presenting the relevant facts about the economic regulation of the electricity sector and the relevant environmental policy. Chapter 4 gives a survey of the organization of production and distribution of electricity in the Netherlands during the period 1989-2001. Chapter 5 gives a sketch of air pollution control policy in the Netherlands in so far as it is relevant for the Dutch electricity sector and for the Dutch chemical industry. In chapter 6 we combine the knowledge of the previous chapters and present a model of a public firm which maximizes its utility from output, emission reduction and

  11. 76 FR 8374 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N021; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  12. 76 FR 33334 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N112; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  13. 75 FR 52012 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N181; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  14. 75 FR 5101 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-02-01

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N010; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  15. 76 FR 18576 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N056; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  16. 76 FR 10063 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-23

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N026; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  17. 75 FR 27361 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N095; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  18. 78 FR 76171 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-12-16

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and...: Geoffrey Ridder; Utopia, TX; PRT-00030B The applicant requests a permit to export the sport-hunted trophy... period. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  19. 16 CFR 500.25 - Net quantity, average quantity, permitted variations.

    Science.gov (United States)

    2010-01-01

    ... good distribution practice and which unavoidably result in change of weight or mass or measure. (c... good packaging practice: Provided, that such variations shall not be permitted to such extent that the... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Net quantity, average quantity, permitted...

  20. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  1. 76 FR 454 - Hazardous Materials Transportation: Revisions of Special Permits Procedures

    Science.gov (United States)

    2011-01-05

    ... special permits. The HMR generally are performance-oriented regulations that provide the regulated... forbidden for transportation by aircraft except under a special permit (see Columns 9A and 9B in the table...

  2. 75 FR 45650 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N149; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of an application to...

  3. 75 FR 20621 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2009-N0054]; [30120-1113-0000-F6] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: We, the U.S. Fish and...

  4. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Bridges not requiring a USCG permit. 650.805 Section 650... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... permit is not required for bridge construction. This determination shall be made at an early stage of...

  5. 77 FR 74507 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-12-14

    ... not operate to the disadvantage of the endangered species, and (3) the granted permit would be.... Zoological Park. 2012. 82880A Big Game Studio 77 FR 54604; September 5, October 17, 2012. 2012. 83520A Donald...; fax (703) 358-2280. Brenda Tapia, Program Analyst/Data Administrator, Branch of Permits, Division of...

  6. 36 CFR 71.7 - Entrance fees for single-visit permits.

    Science.gov (United States)

    2010-07-01

    ... either Golden Eagle or Golden Age Passports. (1) The fee for a single-visit permit applicable to those.... “Accompanying,” for the purpose of this section, shall mean entering together with the permittee while being...-visit permit applicable to those persons entering by any means other than private, noncommercial vehicle...

  7. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted...

  8. 36 CFR 251.103 - Mediation of term grazing permit disputes.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Mediation of term grazing... Lands § 251.103 Mediation of term grazing permit disputes. (a) Decisions subject to mediation. In those States with Department of Agriculture certified mediation programs, any holder of a term grazing permit...

  9. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Science.gov (United States)

    2012-04-23

    ... Objection to State Operating Permits for Consolidated Environmental Management, Inc.--Nucor Steel Louisiana... Management, Inc.--Nucor Steel Louisiana (``Nucor'') in Saint James Parish, Louisiana. Pursuant to sections... Environmental Management, Inc.--Nucor Steel Louisiana (``Nucor'') is available electronically at: http://www.epa...

  10. Number of outer electrons as descriptor for adsorption processes on transition metals and their oxides

    DEFF Research Database (Denmark)

    Calle-Vallejo, Federico; Inoglu, Nilay G.; Su, Hai-Yan

    2013-01-01

    The trends in adsorption energies of the intermediates of the oxygen reduction and evolution reactions on transition metals and their oxides are smoothly captured by the number of outer electrons. This unique descriptor permits the construction of predictive adsorption-energy grids and explains t...

  11. 78 FR 36819 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2013-06-19

    ... the special Centennial, CO. 172.301(c), 180.205(f) permit to authorize and (g), and ultrasonic... special Centennial, CO. 172.302a(b)(2), (4) permit to authorize and (5), 180.205(f) ultrasonic equipment...

  12. 25 CFR 166.220 - What are the basic steps for acquiring a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What are the basic steps for acquiring a permit through negotiation? 166.220 Section 166.220 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.220 What are the basic steps for acquiring a permit through negotiation? The...

  13. Improved Safety and Efficiency of Protected/Permitted Right-Turns in Oregon

    Science.gov (United States)

    2018-05-01

    This research aimed to develop an understanding of the safety and operational implications of using the flashing yellow arrow (FYA) in permitted and protected/permitted right turn (PPRT) operations to maximize safety and efficiency. This report inclu...

  14. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  15. Akademie čili nevěstinec

    Czech Academy of Sciences Publication Activity Database

    Cidlinská, Kateřina

    (2015) ISSN 0862-5921 Institutional support: RVO:68378025 Keywords : Library of the Czech Academy of Sciences * exhibition * nudes Subject RIV: AO - Sociology, Demography http://www.lidovky.cz/akademie-cili-nevestinec-08h-/kultura.aspx?c=A151106_165942_ln_kultura_ELE

  16. Jazyk a nevědomí

    Czech Academy of Sciences Publication Activity Database

    Krása, Jan

    2005-01-01

    Roč. 49, č. 4 (2005), s. 289-301 ISSN 0009-062X Institutional research plan: CEZ:AV0Z70250504 Keywords : inner speech * conscousness * unconscousness Subject RIV: AN - Psychology Impact factor: 0.241, year: 2005

  17. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  18. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  19. Family number non-conservation induced by the supersymmetric mixing of scalar leptons

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.J.S.

    1987-08-01

    The most egregious aspect of (N = 1) supersymmetric theories is that each particle state is accompanied by a 'super-partner', a state with identical quantum numbers save that it differs in spin by one half unit. For the leptons these are scalars and are called ''sleptons'', or scalar leptons. These consist of the charged sleptons (selectron, smuon, stau) and the scalar neutrinos ('sneutrinos'). We examine a model of supersymmetry with soft breaking terms in the electroweak sector. Explicit mixing among the scalar leptons results in a number of effects, principally non-conservation of lepton family number. Comparison with experiment permits us to place constraints upon the model. 49 refs., 12 figs.

  20. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    Science.gov (United States)

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  1. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  2. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  3. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  4. A Note on Market Power in an Emission Permits Market with Banking

    International Nuclear Information System (INIS)

    Liski, M.; Montero, J.P.

    2005-01-01

    In this paper, we investigate the effect of market power on equilibrium path of an emission permits market in which firms can bank current permits for use in later periods. In particular, we study the market equilibrium for a large (potentially dominant) firm and competitive fringe with rational expectations. We characterize the equilibrium solution for different permits allocations and discuss the large firms stock-holding constraints needed for credible market manipulation

  5. HANDBOOK: GUIDANCE ON SETTING PERMIT CONDITIONS AND REPORTING TRIAL BURN RESULTS

    Science.gov (United States)

    This Handbook provides guidance for establishing operational conditions for incinerators. he document provides a means for state and local agencies to achieve a level of consistency in setting permit conditions that will result in establishment of more uniform permit conditions n...

  6. Hanford facility dangerous waste Part A, Form 3, and Part B permit application documentation for the Central Waste Complex (WA7890008967) (TSD: TS-2-4)

    International Nuclear Information System (INIS)

    Saueressig, D.G.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998

  7. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  8. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... the logistical and cost concerns regarding the ability of the railroad industry to comply with the... incorporating the applicable GRL Special Permits into the HMR (and FRA's subsequent approval notice) those...

  9. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ...-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to take (capture...-listed Drosophila species on the island of Kauai in the State of Hawaii for the purpose of enhancing its... in the State of Hawaii: Astelia waialealae (painiu), Canavalia napaliensis (awikiwiki), Chamaesyce...

  10. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  11. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit. (a) An elephant, hippopotamus, rhinoceros, or tapir shall not be imported into the United States... export an elephant, hippopotamus, rhinoceros, or tapir to the United States; (2) The name and address of...

  12. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  13. A conceptual analysis of the application of tradable permits to biodiversity conservation.

    Science.gov (United States)

    Wissel, Silvia; Wätzold, Frank

    2010-04-01

    Tradable permits have been applied in many areas of environmental policy and may be a response to increasing calls for flexible conservation instruments that successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing that habitat of at least the equivalent ecological value is restored elsewhere. The developer himself does not need to carry out the restoration, but may buy a permit from a third party, thus allowing a market to emerge. Nevertheless, the application of tradable permits to biodiversity conservation is a complex issue because destroyed and restored habitats are likely to differ. There may be various trade-offs between the ecological requirements that destroyed and restored habitats be as similar as possible, and the need for a certain level of market activity to have a functioning trading system. The success of tradable permits as an instrument for reconciling the conflicts between economic development and conservation depends on the existence of certain economic, institutional, and ecological preconditions, for example, a functioning institutional framework, sufficient expert knowledge, and adequate monitoring and enforcement mechanisms.

  14. Allocation of emission permits with leakage through capital markets

    International Nuclear Information System (INIS)

    Maestad, Ottar

    2007-01-01

    This paper analyses how tradable emission permits should be allocated to firms when capital is internationally mobile. When international environmental problems are attempted solved through uncoordinated policies between countries, it might be desirable for the home country to issue free emission permits in proportion to the use of capital in order to prevent leakage through international capital movements. The desirability of free emission permits will however be reduced if capital also can be employed in a domestic non-polluting sector. In this case, it may even be optimal to tax the use of capital in the polluting sector. It is also shown that it is always optimal to subsidise the use of capital in the polluting sector if the use of labour is taxed at an optimal rate. Finally, leakage does not affect the optimal domestic emission limit as long as appropriate capital subsidies and labour taxes are implementeed. (author)

  15. Pollution permits allocation and imperfect competition; Allocation de permis de pollution et concurrence imparfaite

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, S.

    2004-12-15

    The aim of this thesis is to highlight the imperfections on the permits markets and to analyze their consequences on markets' efficiency. More precisely, we try to identify the implications of the initial allocation of permits when such imperfections are present. We try to draw some conclusions for the regulator concerning the different forms of the permits' allocation. After having described and compared these forms, we define in which circumstances the initial allocation matters in terms of efficiency. Then, we study different forms of imperfections. First, we take into account the information asymmetry between firms and the regulator and we define an optimal mechanism to sell pollution permits. Then, we analyze a market power on a differentiated pollution permits market. At last, we study the exclusionary manipulation of pollution permits market. (author)

  16. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  17. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... such Presidential Permits: (1) ERA will determine whether an Environmental Impact Statement (EIS) or an...

  18. Applying tradable permits to biodiversity conservation: A conceptual analysis of trading rules

    OpenAIRE

    Wissel, Silvia; Wätzold, Frank

    2008-01-01

    Tradable permits have already been applied in many areas of environmental policy and may be a possible response to increasing calls for flexible conservation instruments which are able to successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing th...

  19. Search for a perfect generator of random numbers

    International Nuclear Information System (INIS)

    Musyck, E.

    1977-01-01

    Theoretical tests have been carried out by COVEYOU and MAC PHERSON to verify the applications of the LEHMER algorithm. In a similar way, a theoretical method is proposed to evaluate in a rigorous way the random character of numbers generated by a shift register. This theory introduces the concept of ''degree of randomness'' of the elements, taken in a definite order, of a shift register. It permits making the judicious choice of the elements of the shift register which will produce the bits of the random numbers. On the other hand, a calculation method is developed in order to verify the primitive character of any shift register of high complexity. A new test, called ''slice test'', of empirical and theoretical use is also described; it constitutes a significant contribution to the understanding of certain properties of pseudo-random sequences. As a practical example, a random number generator structure formed with 32 bits, built out of a shift register with 61 elements and 60 modulo-2 adder circuits was made. The author is convinced that this generator can be considered to be practically perfect for all empirical applications of random numbers, particularly for the solution of Monte-Carlo problems. (author)

  20. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  1. 75 FR 19968 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2010-04-16

    ... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...

  2. The American experience of negotiable permits to combat air pollution

    International Nuclear Information System (INIS)

    Gros, Ch.

    2001-01-01

    Negotiable permits have been used in various fields, but the system in which they have seen greatest use is undoubtedly the American system of negotiable permits to fight acid rain. Since the 1970's, the United States have introduced elements of flexibility into their policy for fighting atmospheric pollution. These elements have included the family of negotiable permits. However, it was only in 1990 during the vote to amend the law on air cleanliness that a genuine market for the rights to emit SO 2 was set up (taking effect on january 1. 1995). This article analyses this context in order to understand why and how such an instrument has been introduced, and goes on to present the results. (author)

  3. 78 FR 5451 - Federal Acquisition Regulation; Submission for OMB Review; Permits, Authorities, or Franchises

    Science.gov (United States)

    2013-01-25

    ...; Submission for OMB Review; Permits, Authorities, or Franchises AGENCIES: Department of Defense (DOD), General... approved information collection requirement concerning permits, authorities, or franchises for regulated..., Permits, Authorities, or Franchises, by any of the following methods: Regulations.gov : http://www...

  4. Asymmetric learning by doing and dynamically efficient policy: implications for domestic and international emissions permit trading of allocating permits usefully

    International Nuclear Information System (INIS)

    Read, Peter

    2000-01-01

    Learning by doing leads to cost reductions as suppliers move down the 'experience curve'. This results in a beneficial supply side inter-temporal externality that, for dynamic efficiency, requires a higher incentive for abatement innovations than the penalty on emissions. This effect can be achieved by a dedicated emissions tax or by a proportionate abatement obligation or by allocating permits usefully. The latter arrangement is compatible with the effective cap on emissions that is secured by an emissions trading scheme. Each of the three possibilities results in a reduced loss of international competitivity in policy-committed regions, in less 'leakage, and in more technology transfer. Implications for trading in emissions permits and in project-related credits are discussed. (Author)

  5. 30 CFR 75.812 - Movement of high-voltage power centers and portable transformers; permit.

    Science.gov (United States)

    2010-07-01

    ... portable transformers; permit. 75.812 Section 75.812 Mineral Resources MINE SAFETY AND HEALTH... transformers; permit. [Statutory Provisions] Power centers and portable transformers shall be deenergized... than such centers or transformers is not available, the Secretary may permit such centers and...

  6. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  7. 50 CFR 648.4 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... carrying passengers for hire. (8) Atlantic bluefish vessels. (i) Commercial. Any vessel of the United... lands Atlantic bluefish in or from the EEZ in excess of the recreational possession limit specified at § 648.164 must have been issued and carry on board a valid commercial bluefish vessel permit. (ii) Party...

  8. 50 CFR 25.55 - Refuge admission permits.

    Science.gov (United States)

    2010-10-01

    ...-specific permits, at Fish and Wildlife Service Regional and Washington, DC Offices, and at other locations....55 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR... the holder on the front. ...

  9. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2012-09-25

    ... Objection to State Operating Permit for Cheyenne Light, Fuel & Power, Wygen II Power Plant AGENCY... to Cheyenne Light, Fuel & Power (CLF&P) for their Wygen II power plant (Wygen II). Pursuant to... final Order, the Petition, and other supporting information. You may view the hard copies Monday through...

  10. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  11. Lõhmuse tutvuskond toetab Eesti IT-sektorit / Viktoria Korpan

    Index Scriptorium Estoniae

    Korpan, Viktoria, 1976-

    1999-01-01

    Investeerimispank Lõhmus, Haavel & Viisemann (LHV) kavandab aktsiaemissiooni ASi New Economy Ventures (NEV) jaoks, et teha selle kaudu investeeringuid infotehnoloogiafirmadesse. Sama plaan on investeerimisfirmal Trigon Capital

  12. Market power in the market for greenhouse gas emission permits - the interplay with the fossil fuel markets

    International Nuclear Information System (INIS)

    Hagem, Cathrine; Maestad, Ottar

    2002-01-01

    Implementation of the Kyoto Protocol is likely to leave Russia and other Eastern European countries with market power in the market for emission permits. Ceteris paribus, this will raise the permit price above the competitive permit price. However, Russia is also a large exporter of fossil fuels. A high price on emission permits may lower the producer price on fossil fuels. Thus, if Russia co-ordinates its permit market and fossil fuel market policies, market power will not necessarily lead to a higher permit price. Fossil fuel producers may also exert market power in the permit market, provided they conceive the permit price to be influenced by their production volumes. If higher volumes drive up the permit price Russian fuel producers may become more aggressive relative to their competitors in the fuel markets. If the sale of fuels is co-ordinated with the sale of permits. The result is reversed if high fuel production drives the permit price down. (Author)

  13. Market power in the market for greenhouse gas emission permits - the interplay with the fossil fuel markets

    Energy Technology Data Exchange (ETDEWEB)

    Hagem, Cathrine; Maestad, Ottar

    2002-07-01

    Implementation of the Kyoto Protocol is likely to leave Russia and other Eastern European countries with market power in the market for emission permits. Ceteris paribus, this will raise the permit price above the competitive permit price. However, Russia is also a large exporter of fossil fuels. A high price on emission permits may lower the producer price on fossil fuels. Thus, if Russia co-ordinates its permit market and fossil fuel market policies, market power will not necessarily lead to a higher permit price. Fossil fuel producers may also exert market power in the permit market, provided they conceive the permit price to be influenced by their production volumes. If higher volumes drive up the permit price Russian fuel producers may become more aggressive relative to their competitors in the fuel markets. If the sale of fuels is co-ordinated with the sale of permits. The result is reversed if high fuel production drives the permit price down. (Author)

  14. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    International Nuclear Information System (INIS)

    Rehdanz, Katrin; Tol, Richard S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission reduction target and export more permits. This in turn would not only reduce the costs for both countries as less emissions have to be reduced, but it also lowers the environmental benefits of the importing country. One price instrument (tariff) and two quantity instruments (discount, quota) to prevent the exporting country from issuing more permits are examined. Each instrument restricts trade and alters the terms of trade for the two countries. The importing country (and regulator) prefers an import tariff and an import quota to a carbon discount. If the exporting country releases additional permits, the importing country should not try to keep total emissions constant, as that would be ineffective and maybe even counterproductive. Instead, the importing country should aim to keep the total import constant; this would impose costs on the exporting country that are independent of the policy instrument; an import quota would be the cheapest option for the importing country. An import quota would also stress the idea of supplementary of the flexible mechanism as it increases the share of emissions reduced domestically. Compliance and liability issues constrain the market further. However, both the importing and the exporting country would prefer that the permit seller is liable in case of non-compliance, as sellers' liability would less constrain the market

  15. 7 CFR 330.201 - Applications for permits to move plant pests.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Applications for permits to move plant pests. 330.201... HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.201 Applications for permits to...

  16. 36 CFR 222.3 - Issuance of grazing and livestock use permits.

    Science.gov (United States)

    2010-07-01

    ... livestock use permits. 222.3 Section 222.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE RANGE MANAGEMENT Grazing and Livestock Use on the National Forest System § 222.3 Issuance of grazing and livestock use permits. (a) Unless otherwise specified by the Chief, Forest Service, all...

  17. 40 CFR 60.4122 - Information requirements for Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Information requirements for Hg budget... requirements for Hg budget permit applications. A complete Hg Budget permit application shall include the following elements concerning the Hg Budget source for which the application is submitted, in a format...

  18. 78 FR 66683 - Fisheries in the Western Pacific; Special Coral Reef Ecosystem Fishing Permit

    Science.gov (United States)

    2013-11-06

    ... the Western Pacific; Special Coral Reef Ecosystem Fishing Permit AGENCY: National Marine Fisheries... special coral reef ecosystem fishing permit. SUMMARY: NMFS issued a Special Coral Reef Ecosystem Fishing Permit that authorizes Kampachi Farms, LLC, to culture and harvest a coral reef ecosystem management unit...

  19. 77 FR 49484 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-08-16

    ... the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit..., UT. Party to Special Permits Application 15537-P Austin Powder 4 10-31-2012 Company, Cleveland, OH...

  20. 50 CFR 222.305 - Rights of succession and transfer of permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Rights of succession and transfer of... THREATENED MARINE SPECIES General Permit Procedures § 222.305 Rights of succession and transfer of permits... business activities in connection with a business or commercial enterprise, which is then subject to any...

  1. 40 CFR 60.4120 - General Hg budget trading program permit requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false General Hg budget trading program... and Compliance Times for Coal-Fired Electric Steam Generating Units Permits § 60.4120 General Hg budget trading program permit requirements. (a) For each Hg Budget source required to have a title V...

  2. The efficiency and equity of marketable permits for CO2 emissions

    International Nuclear Information System (INIS)

    Rose, A.; Stevens, B.

    1993-01-01

    This paper examines the efficiency and equity implications of alternative assignments of marketable permits for carbon dioxide. A non-linear programming model is used to estimate the net welfare changes of permit allocations based on Sovereignty and Rawlsian equity criteria for 8 countries/regions covering the spectrum of economic development levels. The net welfare gains associated with an overall 20% reduction in CO 2 emissions are estimated to be nearly 20 billion dollars, an increase of several billion dollars over a system of inflexible emission quotas requiring 20% abatement in each country. Also, although the welfare changes implied by alternative permit assignments may vary greatly between countries before trading, the trading process significantly reduces the disparities. This result stems from the Coase Theorem, which implies a uniquely efficient outcome. That is, individual country abatement levels and, hence, costs, are the same under all permit assignments after trading, and net welfare for a given nation differs only by the amount of permit revenues/expenditures associated with the application of alternative equity criteria. Foremost among the paper's policy implications is that although equity criteria may differ significantly in principle, their welfare implications in practice may be very similar for various subsets of these criteria. This should reduce tensions at the bargaining table and facilitate the negotiation of greenhouse gas agreements. 52 refs., 3 figs., 8 tabs

  3. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    ... an amount qualifying as hazardous material. (modes 1, 2, 3, 4) 15860-N......... Apple Inc. 49 CFR To... strength stiffness. 13581-M......... Bengal Products 49 CFR To modify the Inc. Baton 173.306(a)(3). special............ Carleton 49 CFR 173.302a To modify the Technologies special permit to Inc. (Former change a drawing Grantee...

  4. 12 CFR 563.146 - Will the OTS permit my capital distribution?

    Science.gov (United States)

    2010-01-01

    ... under 12 U.S.C. 1831o(d)(1)(B). (b) Your proposed capital distribution raises safety or soundness... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Will the OTS permit my capital distribution... SAVINGS ASSOCIATIONS-OPERATIONS Capital Distributions § 563.146 Will the OTS permit my capital...

  5. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  6. The availability of smoking-permitted accommodations from Airbnb in 12 Canadian cities.

    Science.gov (United States)

    Kennedy, Ryan David; Douglas, Ornell; Stehouwer, Lindsay; Dawson, Jackie

    2018-01-01

    Airbnb is a web-based peer-to-peer (P2P) service that enables potential hosts and guests to broker accommodations in private homes as an alternative to traditional hotels. The hospitality sector has increasingly gone smoke-free over the last decade. This study identified the availability and cost of smoking-permitted accommodations identified on Airbnb. The study team searched for Airbnb accommodations in 12 Canadian cities across each of Canada's 10 provinces. Searches included availability for a single person for a private room, or double occupancy for an entire home/apartment; searches were for 1-night and 1-week stays. Cities across Canada, including Regina, Fredericton and Charlottetown, had no smoking-permitted accommodations available for the searches conducted. The proportion of private rooms available for one night that permitted smoking ranged from 2% in Calgary, 4% in Winnipeg and St. John's, 10% in Halifax and Victoria, 18% in Toronto, 45% in Vancouver and 69% in Montréal. The average cost for a private room for one night in Vancouver was $128, while the cost for a private room that permits smoking was $62; however, in other markets prices were more similar. Across Canada, there is a wide range of smoking-permitted accommodations available through Airbnb. In some markets, smoking-permitted accommodation may be significantly less expensive than smoke-free options. As hotel chains increasingly go smoke-free, it is possible that the marketplace will respond with offerings to fulfil consumer demand. As policy makers consider how to regulate P2P services like Airbnb, public health considerations should be included. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  7. 77 FR 55475 - Federal Acquisition Regulation; Information Collection; Permits, Authorities, or Franchises

    Science.gov (United States)

    2012-09-10

    ...; Information Collection; Permits, Authorities, or Franchises AGENCY: Department of Defense (DOD), General... approved information collection requirement concerning permits, authorities, or franchises for regulated..., Authorities, or Franchises, by any of the following methods: Regulations.gov : http://www.regulations.gov...

  8. Tradeable CO2 emission permits for cost-effective control of global warming

    International Nuclear Information System (INIS)

    Kosobud, R.F.; South, D.W.; Daly, T.A.; Quinn, K.G.

    1991-01-01

    Many current global warming mitigation policy proposals call for large, near-term reductions in CO 2 emissions, thereby entailing high initial carbon emission tax rates or permit prices. This paper claims that these high initial tax rates or permit prices are not cost-effective in achieving the desired degree of climate change control. A cost-effective permit system is proposed and described that, under certain assumptions, would allow markets to optimally lead permit prices along a gradually increasing trajectory over tie. This price path presents the Hotelling result and would ease the abrupt, inefficient, and costly adjustments imposed on the fossil fuel and other industries in current proposals. This finding is demonstrated using the Argonne Model, a linear programming energy- environmental-economic model that allows for intertemporal optimization of consumer energy well-being. 12 refs., 3 figs., 1 tab

  9. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  10. Relationship Between the Part 70 Operating Permit Program and Section 112(r)

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Incorporation of Startup, Shutdown, and Malfunction Plans into Source's Title V Permits

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. 40 CFR 96.83 - Applying for NOX Budget opt-in permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Applying for NOX Budget opt-in permit... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Individual Unit Opt-ins § 96.83 Applying for NOX Budget opt-in permit. (a) Applying for...

  13. Liquid effluent retention facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This appendix to the Liquid Effluent Retention Facility Dangerous Waste Permit Application contains pumps, piping, leak detection systems, geomembranes, leachate collection systems, earthworks and floating cover systems

  14. Complying with the Kyoto Protocol under uncertainty: Taxes or tradable permits?

    International Nuclear Information System (INIS)

    Quirion, Philippe

    2010-01-01

    The Kyoto Protocol allocates tradable emission allowances (AAUs) to developed countries, but they are free to choose a set of policy instruments to comply with these targets. We compare two different policy instruments: a tax and purely domestic tradable permits, for the European Union, the US and Japan. Information on abatement costs and international permit price is imperfect and stems from nine global economic models. For a country party to the Protocol, the benefit of emission reduction is that it can sell more or has to buy less AAUs. We show that in this context, permits entail a slightly lower expected cost than a tax for the US and Japan, whereas both instruments yield an almost equal outcome for Europe. Applying Weitzman's framework (Prices vs. quantities, RES, 1974) in this context, we show the importance of the positive correlation between costs and benefits: technology shocks that lead to low abatement costs in one country generally lead to low abatement costs in other countries too, thereby leading to a low international permit price in the true-up period.

  15. Transportation of Large Wind Components: A Permitting and Regulatory Review

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cook, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This report summarizes permitting and regulatory issues associated with transporting wind turbine blades, towers, and nacelles as well as large transformers (wind components). These wind components are commonly categorized as oversized and overweight (OSOW) and require specific permit approvals from state and local jurisdictions. The report was developed based on a Quadrennial Energy Review (QER) recommendation on logistical requirements for the transportation of 'oversized or high-consequence energy materials, equipment, and components.'

  16. State Waste Discharge Permit Application: Electric resistance tomography testing

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  17. State Waste Discharge Permit Application: Electric resistance tomography testing

    International Nuclear Information System (INIS)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks

  18. 75 FR 66123 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-10-27

    ... enhancing their survival. Permit No. TE-24582A Applicant: Russell C. Croel, Folsom, California. The..., Contra Costa, Fresno, Glenn, Kings, Merced, Placer, Sacramento, San Joaquin, Shasta, Solano, Stanislaus...

  19. 40 CFR 97.83 - Applying for NOX Budget opt-in permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Applying for NOX Budget opt-in permit... PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Individual Unit Opt-ins. § 97.83 Applying for NOX Budget opt-in permit. (a) Applying for initial NO X Budget opt...

  20. 75 FR 43898 - Hazardous Materials Transportation: Revisions of Special Permits Procedures

    Science.gov (United States)

    2010-07-27

    .... The HMR generally are performance-oriented regulations that provide the regulated community with a... aircraft except under a special permit (see Columns 9A and 9B in the table in 49 CFR 172.101), an applicant... forbidden for transportation by aircraft except under a special permit (see Columns 9A and 9B in the table...

  1. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  2. 45 CFR 671.6 - Applications for permits.

    Science.gov (United States)

    2010-10-01

    ... such releases; arrangements for waste management, including, without limitation, plans for waste...) The desired effective date and duration of the permit; and (5) The following certification: “I certify... (including duration). The notice shall invite the submission by interested parties, the Environmental...

  3. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received...

  4. 77 FR 38834 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-06-29

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received...

  5. 76 FR 80960 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2011-12-27

    ..., Kansas, Nebraska, and South Dakota, for the purpose of enhancing the species' survival. Permit... certain activities with endangered or threatened species. The Endangered Species Act of 1973, as amended (Act), prohibits activities with endangered and threatened species unless a Federal permit allows such...

  6. 75 FR 70254 - PSD and Title V Permitting Guidance for Greenhouse Gases

    Science.gov (United States)

    2010-11-17

    ... Guidance for Greenhouse Gases AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability..., ``PSD and Title V Permitting Guidance for Greenhouse Gases'' on its significant guidance Internet Web... guidance titled, ``PSD and Title V Permitting Guidance for Greenhouse Gases.'' This document has been...

  7. 78 FR 59728 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-27

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Foundation (NSF) is required to publish a notice of permit applications received to conduct activities...

  8. Lessons from Queensland's last-drinks legislation: The use of extended trading permits.

    Science.gov (United States)

    Zahnow, Renee; Miller, Peter; Coomber, Kerri; de Andrade, Dominique; Ferris, Jason

    2018-05-01

    The association between alcohol availability, alcohol consumption and, in turn, alcohol-related harms is well established. Policies to reduce alcohol-related harms focus on limiting accessibility through the regulation of the liquor industry, including trading hours. On 1 July 2016, the Queensland Government introduced legislation to reduce ordinary liquor trading hours, replacing 5 am closing times with 3 am cessation of liquor sales in designated entertainment precincts and 2 am cessation of sales across the rest of the state. However, the amendment was under-inclusive and did not apply to temporary extended trading permits, a provision of the Liquor Act 1992 allowing one-off variations in trading hours for special events. We use 24 months of data (1 January 2015 to 31 December 2016) from the Office of Liquor Gaming and Regulation to explore patterns of extended trading permit use across Queensland, pre- and post- 1 July 2016. We find that following the Amendment in 2016 there was also a distinct shift in the utilisation of temporary extended trading permits, with a 63% increase in approved permits between 2015 and 2016. Temporal clustering around key calendar events dissipated following 1 July 2016 with consistent concentration of permit utilisation over consecutive weeks. Using temporary extended trading permits venue owners avoided earlier closing times and continued to operate until 5 am. The findings provide lessons for future policy implementation by illustrating the capacity for under-inclusive legislation to result in the dilution of intended effects. © 2018 Australasian Professional Society on Alcohol and other Drugs.

  9. 40 CFR 158.210 - Experimental use permit data requirements for product chemistry.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit data requirements for product chemistry. 158.210 Section 158.210 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for product chemistry. All product chemistry data, as described in...

  10. 40 CFR 221.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... of the proposed dumping on the marine environment, navigation, living and non-living marine resource... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Applications for permits. 221.1 Section 221.1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING...

  11. 50 CFR 16.22 - Injurious wildlife permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Injurious wildlife permits. 16.22 Section 16.22 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND...

  12. 50 CFR 622.4 - Permits and fees.

    Science.gov (United States)

    2010-10-01

    ... organization. (C) Information concerning vessels, harvesting gear/methods, or fishing areas, as specified on... inspection; (3) Discusses possible hazards to safe navigation or hindrance to vessel traffic, traditional... upon the permitted vessel and/or captain, as appropriate, being included in an active survey frame for...

  13. 75 FR 30428 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-01

    ... (Oreonax flavicauda) from Peru for the purpose of enhancement of the species through scientific research... be conducted under the remainder of the 5-year period of the permit. Applicant: Natural History...

  14. Storm Water General Permit 1 for Industrial Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #1 for storm water discharges associated with industrial facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES) program.

  15. 75 FR 34766 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2007and.... Applicant: United States Department of Agriculture/Animal and Plant Health Inspection Service/Wildlife...

  16. 75 FR 41235 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-15

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... the species. Multiple Applicants The following applicants each request a permit to import the sport...

  17. 75 FR 19656 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-04-15

    ... agency decisions are: (1) Those supported by quantitative information or studies; and (2) Those that... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  18. 48 CFR 52.236-7 - Permits and Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws... negligence. The Contractor shall also be responsible for all materials delivered and work performed until...

  19. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  20. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  1. Determination of the minimum number of fuel elements of the RP-10 research reactor

    International Nuclear Information System (INIS)

    Languasco, J.

    1989-01-01

    The peruvian research reactor RP-10 is composed of a compound nucleus of boxes containing fuel plates which are cooled with light water in order to remove heat produced by fission of uranium atoms. However from a certainty viewpoint, it exists certain restrictions to design the cooling system. The most admissible caloric flux of 90.3 watts/cm 2 is deflux of 90.3 watts/cm 2 is determined on the basis of these thermic restrictions when cooling speed is 409 cm/sec permitting at least 24 fuel elements(boxes) within the nucleus. On the basis of restrictions of load loss in the nucleus, it would be permitted at least 18 fuel elements, but this quantity breaks thermic restrictions for this reason, 24 boxes in the nucleus will be the minimum number of elements

  2. 76 FR 36934 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-06-23

    ... Entertainment Inc., Vienna, VA; PRT-37444A The applicant requests a permit to import for the purpose of... tiger (Panthera tigris altaica), and 6 tigers (Panthera tigris). The captive-born animals are being... following applicants each request a permit to import the sport- hunted [[Page 36935

  3. 50 CFR 679.84 - Rockfish Program recordkeeping, permits, monitoring, and catch accounting.

    Science.gov (United States)

    2010-10-01

    ..., monitoring, and catch accounting. 679.84 Section 679.84 Wildlife and Fisheries FISHERY CONSERVATION AND..., permits, monitoring, and catch accounting. (a) Recordkeeping and reporting. See § 679.5(r). (b) Permits... cooperative or rockfish limited access fishery. The requirements under paragraphs (c)(1) through (9) of this...

  4. 77 FR 65875 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2012-10-31

    ... Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... modification to Arizona's municipal solid waste landfill (MSWLF) permit program to allow the State to issue... amending the municipal solid waste landfill criteria at 40 CFR 258.4 to allow for Research, Development...

  5. 40 CFR 158.270 - Experimental use permit data requirements for residue chemistry.

    Science.gov (United States)

    2010-07-01

    ... requirements for residue chemistry. 158.270 Section 158.270 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for residue chemistry. All residue chemistry data, as described in... section 408(r) is sought. Residue chemistry data are not required for an experimental use permit issued on...

  6. 75 FR 44986 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  7. 75 FR 14627 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-03-26

    ... Zoological, LLC, Greenwich, CT; PRT-01671A The applicant requests a permit to import a female cheetah (Acrinonyx jubatus) from DeWildt Cheetah Breeding Centre, South Africa where the individual cheetah was...

  8. 50 CFR 21.23 - Scientific collecting permits.

    Science.gov (United States)

    2010-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... possessed under authority of a scientific collecting permit must be donated and transferred to the public...

  9. 43 CFR 13.2 - Application for permit.

    Science.gov (United States)

    2010-10-01

    ..., Education, and Welfare under the Randolph-Sheppard Vending Stand Act may apply for permits to establish and maintain vending facilities, including both vending stands and machines, to be operated by blind persons... Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND...

  10. 32 CFR 767.7 - Conditions of permits.

    Science.gov (United States)

    2010-07-01

    ... GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE JURISDICATION OF THE... to submit to NHC a working and diving log listing days spent in field research, activities pursued... protect all sensitive information regarding the location and character of the wreck site that could...

  11. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  12. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  13. 76 FR 11803 - Collection of Information Under Review by Office of Management and Budget: OMB Control Numbers...

    Science.gov (United States)

    2011-03-03

    ... Review by Office of Management and Budget: OMB Control Numbers: 1625-0058, 1625-0072 and 1625-0092 AGENCY...), abstracted below, to the, Office of Management and Budget (OMB), Office of Information and Regulatory Affairs..., Application for Permit to Transport Municipal and Commercial Waste, 1625-0072, Waste Management Plans, Refuse...

  14. 30 CFR 773.23 - Suspension or rescission requirements for improvidently issued permits.

    Science.gov (United States)

    2010-07-01

    ... improvidently issued permits. 773.23 Section 773.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... jurisdiction over the violation; (2) You or your operator no longer own or control the relevant operation; (3...

  15. 7 CFR 319.24-1 - Applications for permits for importation of corn.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Applications for permits for importation of corn. 319... PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES Corn Diseases Regulations Governing Entry of Indian Corn Or Maize § 319.24-1 Applications for permits for importation of...

  16. 77 FR 46514 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-03

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... a permit to export the sport-hunted trophy of one male Addax (Addax nasomaculatus) culled from a... permit to export the sport-hunted trophy of one male Addax (Addax nasomaculatus) culled from a captive...

  17. 77 FR 43108 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-07-23

    ... agency decisions are: (1) Those supported by quantitative information or studies; and (2) Those that... Taxidermy, Brady, TX; PRT-75675A The applicant requests a permit to export the sport-hunted trophy/ trophies... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  18. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  19. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  20. AQUIS: A PC-based air quality and permit information system

    International Nuclear Information System (INIS)

    Smith, A.E.; Huber, C.C.; Tschanz, J.; Ryckman, J.S. Jr.

    1992-01-01

    The Air Quality Utility Information System (AQUIS) was developed to calculate and track emissions, permits, and related information. The system runs on IBM-compatible personal computers using dBASE IV. AQUIS tracks more than 900 data items distributed among various source categories and allows the user to enter specific information on permit control devices, stacks, and related regulatory requirements. The system is currently operating at seven US Air Force Materiel Command facilities, large industrial operations involved in the repair and maintenance of aircraft. Environmental management personnel are responsible for the compliance status of as many as l,000 sources at each facility. The usefulness of the system has been enhanced by providing a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing specified information. In addition to the standard six pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emission estimates. This capability will be useful in developing air toxics inventories and control plans

  1. The availability of smoking-permitted accommodations from Airbnb in 12 Canadian cities

    Science.gov (United States)

    Kennedy, Ryan David; Douglas, Ornell; Stehouwer, Lindsay; Dawson, Jackie

    2018-01-01

    Purpose Airbnb is a web-based peer-to-peer (P2P) service that enables potential hosts and guests to broker accommodations in private homes as an alternative to traditional hotels. The hospitality sector has increasingly gone smoke-free over the last decade. This study identified the availability and cost of smoking-permitted accommodations identified on Airbnb. Methods The study team searched for Airbnb accommodations in 12 Canadian cities across each of Canada’s 10 provinces. Searches included availability for a single person for a private room, or double occupancy for an entire home/apartment; searches were for 1-night and 1-week stays. Results Cities across Canada, including Regina, Fredericton and Charlottetown, had no smoking-permitted accommodations available for the searches conducted. The proportion of private rooms available for one night that permitted smoking ranged from 2% in Calgary, 4% in Winnipeg and St. John’s, 10% in Halifax and Victoria, 18% in Toronto, 45% in Vancouver and 69% in Montréal. The average cost for a private room for one night in Vancouver was $128, while the cost for a private room that permits smoking was $62; however, in other markets prices were more similar. Discussion Across Canada, there is a wide range of smoking-permitted accommodations available through Airbnb. In some markets, smoking-permitted accommodation may be significantly less expensive than smoke-free options. As hotel chains increasingly go smoke-free, it is possible that the marketplace will respond with offerings to fulfil consumer demand. As policy makers consider how to regulate P2P services like Airbnb, public health considerations should be included. PMID:28219974

  2. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. 9 CFR 72.13 - Permitted dips and procedures.

    Science.gov (United States)

    2010-01-01

    ... proprietary brands of permitted dips—as well the use of compressed air, vat management techniques, and other... maintained and that under actual field conditions the dipping of cattle with a solution of definite strength...

  4. 40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... ELIMINATION SYSTEM Permit Application and Special NPDES Program Requirements § 122.28 General permits... 40 Protection of Environment 21 2010-07-01 2010-07-01 false General permits (applicable to State NPDES programs, see § 123.25). 122.28 Section 122.28 Protection of Environment ENVIRONMENTAL PROTECTION...

  5. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  6. 23 CFR 750.105 - Signs that may be permitted in protected areas.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Signs that may be permitted in protected areas. 750.105... protected areas. (a) Erection or maintenance of the following signs may be permitted in protected areas... phenomena, historic sites, areas of natural scenic beauty or naturally suited for outdoor recreation and...

  7. 77 FR 22604 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-04-16

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... zoological exhibition. Multiple Applicants The following applicants each request a permit to import the sport... requesting no changes to his permit but an extension of time to allow him to complete a study to archive and...

  8. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  9. Inequalities for finite trigonometric sums. An interplay: with some series related to harmonic numbers

    Directory of Open Access Journals (Sweden)

    Omran Kouba

    2016-07-01

    Full Text Available Abstract An interplay between the sum of certain series related to harmonic numbers and certain finite trigonometric sums is investigated. This allows us to express the sum of these series in terms of the considered trigonometric sums, and permits us to find sharp inequalities bounding these trigonometric sums. In particular, this answers positively an open problem of Chen (Excursions in Classical Analysis, 2010.

  10. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  11. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    International Nuclear Information System (INIS)

    Leiby, P.; Rubin, J.

    2001-01-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs

  12. 18 CFR 415.32 - Permitted uses generally.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Permitted uses generally. 415.32 Section 415.32 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION... riding trails. (4) Uses such as lawns, gardens, parking areas and play areas. (b) Within the flood fringe...

  13. Periodic Monitoring in Title V Permits for Turbines Subject to NSPS Subpart GG

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. 78 FR 42540 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-07-16

    ... to the disadvantage of the listed species, and that the terms and conditions of the permit were... UNIVERSITY 207948 3/4/2013 12/31/2017 WESTERN ECOSYSTEMS TECHNOLOGY, INC 050706 10/1/2012 12/31/2015 WESTERN...

  15. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  16. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  17. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  18. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  19. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  20. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)