WorldWideScience

Sample records for periodic train scheduling

  1. Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2015-01-01

    Full Text Available For providing passengers with periodic operation trains and making trains’ time distribution better fit that of passengers, the multiperiod mixed train schedule is first proposed in this paper. It makes each type of train having same origin, destination, route, and stop stations operate based on a periodic basis and allows different types of train to have various operation periods. Then a model of optimizing multiperiod mixed train schedule is built to minimize passengers generalized travel costs with the constraints of trains of same type operating periodically, safe interval requirements of trains’ departure, and arrival times, and so forth. And its heuristic algorithm is designed to optimize the multiperiod mixed train schedule beginning with generating an initial solution by scheduling all types of train type by type and then repeatedly improving their periodic schedules until the objective value cannot be reduced or the iteration number reaches its maximum. Finally, example results illustrate that the proposed model and algorithm can effectively gain a better multiperiod mixed train schedule. However, its passengers deferred times and advanced times are a little higher than these of an aperiodic train schedule.

  2. Scheduling Additional Train Unit Services on Rail Transit Lines

    OpenAIRE

    Zhibin Jiang; Yuyan Tan; Özgür Yalçınkaya

    2014-01-01

    This paper deals with the problem of scheduling additional train unit (TU) services in a double parallel rail transit line, and a mixed integer programming (MIP) model is formulated for integration strategies of new trains connected by TUs with the objective of obtaining higher frequencies in some special sections and special time periods due to mass passenger volumes. We took timetable scheduling and TUs scheduling as an integrated optimization model with two objectives: minimizing travel ti...

  3. Using Multiple Schedules during Functional Communication Training to Promote Rapid Transfer of Treatment Effects

    Science.gov (United States)

    Fisher, Wayne W.; Greer, Brian D.; Fuhrman, Ashley M.; Querim, Angie C.

    2015-01-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and…

  4. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  5. Basic Features of Customer Satisfaction with Train Schedules

    Science.gov (United States)

    Murakoshi, Akiko; Kunimatsu, Taketoshi; Saito, Ayano

    This paper aims to reveal the fundamental features of customer satisfaction with train schedules, which is one of the most basic services provided by a railway company. A customer satisfaction survey of passengers who frequently utilize three lines in the metropolitan area was conducted; we obtained the following findings: (a) out of nine factors to evaluate a train schedule from a passenger's viewpoint, the four most important ones are the frequency of trains running, punctuality, congestion rate, and time distance; (b) the ride-frequency influences the degree of satisfaction with train schedules in a particular line; and (c) it is important to set a numeric goal for the level of customer satisfaction by grasping the relationship between the transport service and a passenger's satisfaction with that service. The difference between customer satisfaction and passenger disutility is also discussed. The findings are expected to help conduct customer satisfaction surveys and also to form the basis for establishing a method by which to evaluate a train schedule from passengers' satisfaction ratings.

  6. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  7. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    Science.gov (United States)

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  8. Optimal trajectory planning and train scheduling for urban rail transit systems

    CERN Document Server

    Wang, Yihui; van den Boom, Ton; De Schutter, Bart

    2016-01-01

    This book contributes to making urban rail transport fast, punctual and energy-efficient –significant factors in the importance of public transportation systems to economic, environmental and social requirements at both municipal and national levels. It proposes new methods for shortening passenger travel times and for reducing energy consumption, addressing two major topics: (1) train trajectory planning: the authors derive a nonlinear model for the operation of trains and present several approaches for calculating optimal and energy-efficient trajectories within a given schedule; and (2) train scheduling: the authors develop a train scheduling model for urban rail systems and optimization approaches with which to balance total passenger travel time with energy efficiency and other costs to the operator. Mixed-integer linear programming and pseudospectral methods are among the new methods proposed for single- and multi-train systems for the solution of the nonlinear trajectory planning problem which involv...

  9. Multiresource allocation and scheduling for periodic soft real-time applications

    Science.gov (United States)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  10. Safety Training: scheduled sessions in April

    CERN Multimedia

    DGS Unit

    2011-01-01

    The following training courses are scheduled in April. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Biocell Training 26-APR-11 (08.30 – 10.00) in French 26-APR-11 (10.30 – 12.00) in French Conduite de plates-formes élévatrices mobiles de personnel (PEMP) 28-APR-11 to 29-APR-11 (08.00 – 17.30) in French* Sécurité chimique – Introduction 29-APR-11 (09.00 – 11.30) in French (*) session in French with the possibility of receiving the documentation in English   By Isabelle Cusato (H...

  11. Periodic Heterogeneous Vehicle Routing Problem With Driver Scheduling

    Science.gov (United States)

    Mardiana Panggabean, Ellis; Mawengkang, Herman; Azis, Zainal; Filia Sari, Rina

    2018-01-01

    The paper develops a model for the optimal management of logistic delivery of a given commodity. The company has different type of vehicles with different capacity to deliver the commodity for customers. The problem is then called Periodic Heterogeneous Vehicle Routing Problem (PHVRP). The goal is to schedule the deliveries according to feasible combinations of delivery days and to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the sum of the costs of all routes over the planning horizon. We propose a combined approach of heuristic algorithm and exact method to solve the problem.

  12. Optimizing Intermodal Train Schedules with a Design Balanced Network Design Model

    DEFF Research Database (Denmark)

    Pedersen, Michael Berliner; Crainic, Teodor Gabriel

    We present a modeling approach for optimizing intermodal trains schedules based on an infrastructure divided into time-dependent train paths. The formulation can be generalized to a capacitated multi commodity network design model with additional design balance constraints. We present a Tabu Search...

  13. Combinations of response-reinforcer relations in periodic and aperiodic schedules.

    Science.gov (United States)

    Kuroda, Toshikazu; Cançado, Carlos R X; Lattal, Kennon A; Elcoro, Mirari; Dickson, Chata A; Cook, James E

    2013-03-01

    Key pecking of 4 pigeons was studied under a two-component multiple schedule in which food deliveries were arranged according to a fixed and a variable interfood interval. The percentage of response-dependent food in each component was varied, first in ascending (0, 10, 30, 70 and 100%) and then in descending orders, in successive conditions. The change in response rates was positively related to the percentage of response-dependent food in each schedule component. Across conditions, positively accelerated and linear patterns of responding occurred consistently in the fixed and variable components, respectively. These results suggest that the response-food dependency determines response rates in periodic and aperiodic schedules, and that the temporal distribution of food determines response patterns independently of the response-food dependency. Running rates, but not postfood pauses, also were positively related to the percentage of dependent food in each condition, in both fixed and variable components. Thus, the relation between overall response rate and the percentage of dependent food was mediated by responding that occurred after postfood pausing. The findings together extend previous studies wherein the dependency was either always present or absent, and increase the generality of the effects of variations in the response-food dependency from aperiodic to periodic schedules. © Society for the Experimental Analysis of Behavior.

  14. Safety Training: scheduled sessions in March

    CERN Multimedia

    DGS Unit

    2011-01-01

    The following training courses are scheduled in March. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Biocell Training 08-MAR-11 (08.30 – 10.00) in English 08-MAR-11 (10.30 – 12.00) in French 15-MAR-11 (08.30 – 10.00) in French 15-MAR-11 (10.30 – 12.00) in French 17-MAR-11 (08.30 – 10.00) in English 17-MAR-11 (10.30 – 12.00) in English 22-MAR-11 (08.30 – 10.00) in French 22-MAR-11 (10.30 – 12.00) in French 24-MAR-11 (08.30 – 10.00) in French 24-MAR-11 (10.30 – 12.00) in French 29-MAR...

  15. Safety Training: scheduled sessions in May

    CERN Multimedia

    Isabelle Cusato (HSE Unit)

    2011-01-01

    The following training courses are scheduled in March. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year.   Biocell Training 10-MAY-11 (08.30 – 10.00) in French 10-MAY-11 (10.30 – 12.00) in French 12-MAY-11 (08.30 – 10.00) in English 12-MAY-11 (10.30 – 12.00) in English 19-MAY-11 (08.30 – 10.00) in French 19-MAY-11 (10.30 – 12.00) in French 24-MAY-11 (08.30 – 10.00) in English 24-MAY-11 (10.30 – 12.00) in English   Champs Magnétiques 13-MAY-11 (09.30 – 11.30) in French...

  16. Auditory Training for Adults Who Have Hearing Loss: A Comparison of Spaced Versus Massed Practice Schedules.

    Science.gov (United States)

    Tye-Murray, Nancy; Spehar, Brent; Barcroft, Joe; Sommers, Mitchell

    2017-08-16

    The spacing effect in human memory research refers to situations in which people learn items better when they study items in spaced intervals rather than massed intervals. This investigation was conducted to compare the efficacy of meaning-oriented auditory training when administered with a spaced versus massed practice schedule. Forty-seven adult hearing aid users received 16 hr of auditory training. Participants in a spaced group (mean age = 64.6 years, SD = 14.7) trained twice per week, and participants in a massed group (mean age = 69.6 years, SD = 17.5) trained for 5 consecutive days each week. Participants completed speech perception tests before training, immediately following training, and then 3 months later. In line with transfer appropriate processing theory, tests assessed both trained tasks and an untrained task. Auditory training improved the speech recognition performance of participants in both groups. Benefits were maintained for 3 months. No effect of practice schedule was found on overall benefits achieved, on retention of benefits, nor on generalizability of benefits to nontrained tasks. The lack of spacing effect in otherwise effective auditory training suggests that perceptual learning may be subject to different influences than are other types of learning, such as vocabulary learning. Hence, clinicians might have latitude in recommending training schedules to accommodate patients' schedules.

  17. Susceptibility of optimal train schedules to stochastic disturbances of process times

    DEFF Research Database (Denmark)

    Larsen, Rune; Pranzo, Marco; D’Ariano, Andrea

    2013-01-01

    study, an advanced branch and bound algorithm, on average, outperforms a First In First Out scheduling rule both in deterministic and stochastic traffic scenarios. However, the characteristic of the stochastic processes and the way a stochastic instance is handled turn out to have a serious impact...... and dwell times). In fact, the objective of railway traffic management is to reduce delay propagation and to increase disturbance robustness of train schedules at a network scale. We present a quantitative study of traffic disturbances and their effects on the schedules computed by simple and advanced...

  18. On utilization bounds for a periodic resource under rate monotonic scheduling

    NARCIS (Netherlands)

    Renssen, van A.M.; Geuns, S.J.; Hausmans, J.P.H.M.; Poncin, W.; Bril, R.J.

    2009-01-01

    This paper revisits utilization bounds for a periodic resource under the rate monotonic (RM) scheduling algorithm. We show that the existing utilization bound, as presented in [8, 9], is optimistic. We subsequently show that by viewing the unavailability of the periodic resource as a deferrable

  19. Collaborative Optimization of Stop Schedule Plan and Ticket Allotment for the Intercity Train

    Directory of Open Access Journals (Sweden)

    Xichun Chen

    2016-01-01

    Full Text Available As regards the ticket allotment issue of the intercity passenger corridor designed for different train grades, the matching relationship between the ticket allotment and the passenger flow demand is studied. The passenger flow conversion equation which is based on the collaborative optimization of the intercity train stop schedule plan and ticket allotment is established. Then the mathematical model aiming at the maximum revenue of intercity train system and the highest satisfaction from the passengers is established. The particle swarm harmony search algorithm is designed to solve the model. The example verifies the effectiveness of the model and algorithm, which indicates that, through the collaborative optimization of the stop schedule plan and ticket allotment for different grades intercity trains, the sectional utilization rate of the train can be improved; meanwhile, the optimum matching between the intercity train revenue and the passenger satisfaction can be realized.

  20. Schedule and complex motion of shuttle bus induced by periodic inflow of passengers

    International Nuclear Information System (INIS)

    Nagatani, Takashi; Naito, Yuichi

    2011-01-01

    We have studied the dynamic behavior of a bus in the shuttle bus transportation with a periodic inflow. A bus schedule is closely related to the dynamics. We present the modified circle map model for the dynamics of the shuttle bus. The motion of the shuttle bus depends on the loading parameter and the inflow period. The shuttle bus displays the periodic, quasi-periodic, and chaotic motions with varying both loading parameter and inflow rate. -- Highlights: → We studied the dynamic behavior of a bus in the shuttle bus transportation. → We presented the modified circle map model for the bus schedule. → We clarified the dependence of the tour time on both loading parameter and inflow period.

  1. Train Stop Scheduling in a High-Speed Rail Network by Utilizing a Two-Stage Approach

    Directory of Open Access Journals (Sweden)

    Huiling Fu

    2012-01-01

    Full Text Available Among the most commonly used methods of scheduling train stops are practical experience and various “one-step” optimal models. These methods face problems of direct transferability and computational complexity when considering a large-scale high-speed rail (HSR network such as the one in China. This paper introduces a two-stage approach for train stop scheduling with a goal of efficiently organizing passenger traffic into a rational train stop pattern combination while retaining features of regularity, connectivity, and rapidity (RCR. Based on a three-level station classification definition, a mixed integer programming model and a train operating tactics descriptive model along with the computing algorithm are developed and presented for the two stages. A real-world numerical example is presented using the Chinese HSR network as the setting. The performance of the train stop schedule and the applicability of the proposed approach are evaluated from the perspective of maintaining RCR.

  2. Evaluation of different time schedules in training with the Da Vinci simulator.

    Science.gov (United States)

    Güldner, C; Orth, A; Dworschak, P; Diogo, I; Mandapathil, M; Teymoortash, A; Walliczek-Dworschak, U

    2017-10-01

    This prospective study analyzed the effect of different time schedules in training on the main performance outcomes: overall score, time to complete, and economy of motion. The study was performed on the da Vinci Skills Simulator from December 2014 to April 2016. Forty robotic novices were randomized into two groups of 20 participants, which trained in the same three exercises but with different intervals between their training sessions. Each group performed training in Peg Board 1 in their first week, Match Board 2 in their second week, and Ring and Rail 2 in their third week. On their last day, Needle Targeting and Energy Dissection 2, for which no previous training had been received, were performed. Regarding the different training intervals, group 1 trained each exercise six times in a row once a week. Group 2 performed their training once a day for 5 days. Technical performance parameters were recorded by the Mimics simulator software for further analysis. In addition, the participants were asked to fill out a questionnaire concerning the robotics training. Group 2 performed significantly better compared to group 1 in the main metrics in the more advanced exercises. For the easier exercises, the training frequency did not lead to significant differences in performance outcome. A significant skills gain was seen between the first and last training sessions for all exercises in both groups. Performance in the final exercise NT was significantly better in group 2 than group 1. Regarding ED 2, no difference was found between the two groups. As the training of group 2 led to significantly better outcomes, we suggest that, especially for advanced exercises, it seems to be more favorable to perform training every day for a short period than to train once a week six times in a row.

  3. Comparison of Periodized and Non-Periodized Resistance Training on Maximal Strength: A Meta-Analysis.

    Science.gov (United States)

    Williams, Tyler D; Tolusso, Danilo V; Fedewa, Michael V; Esco, Michael R

    2017-10-01

    Periodization is a logical method of organizing training into sequential phases and cyclical time periods in order to increase the potential for achieving specific performance goals while minimizing the potential for overtraining. Periodized resistance training plans are proposed to be superior to non-periodized training plans for enhancing maximal strength. The primary aim of this study was to examine the previous literature comparing periodized resistance training plans to non-periodized resistance training plans and determine a quantitative estimate of effect on maximal strength. All studies included in the meta-analysis met the following inclusion criteria: (1) peer-reviewed publication; (2) published in English; (3) comparison of a periodized resistance training group to a non-periodized resistance training group; (4) maximal strength measured by 1-repetition maximum (1RM) squat, bench press, or leg press. Data were extracted and independently coded by two authors. Random-effects models were used to aggregate a mean effect size (ES), 95% confidence intervals (CIs) and potential moderators. The cumulative results of 81 effects gathered from 18 studies published between 1988 and 2015 indicated that the magnitude of improvement in 1RM following periodized resistance training was greater than non-periodized resistance training (ES = 0.43, 95% CI 0.27-0.58; P training status (β = -0.59; P = 0.0305), study length (β = 0.03; P = 0.0067), and training frequency (β = 0.46; P = 0.0123) were associated with a change in 1RM. These results indicate that undulating programs were more favorable for strength gains. Improvements in 1RM were greater among untrained participants. Additionally, higher training frequency and longer study length were associated with larger improvements in 1RM. These results suggest that periodized resistance training plans have a moderate effect on 1RM compared to non-periodized training plans. Variation in training stimuli

  4. No exacerbation of knee joint pain and effusion following preoperative progressive resistance training in patients scheduled for total knee arthroplasty

    DEFF Research Database (Denmark)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas

    2017-01-01

    BACKGROUND: Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. OBJECTIVE: To examine if preoperative PRT initiated 5 weeks prior to TKA would 1......) exacerbate pain and knee effusion, 2) allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. DESIGN: Secondary analyses from a randomized controlled trial. SETTING: University Hospital and a Regional Hospital. PATIENTS: Thirty patients...... OUTCOME MEASURES: Before and after each training session, knee joint pain rated on an 11-point scale, effusion assessed by measuring the knee joint circumference, and training load were recorded. The first and last training session were initiated by 1RM testing of unilateral leg press, knee extension...

  5. Integrating rolling stock scheduling with train unit shunting

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Lusby, Richard Martin

    2017-01-01

    In this paper, we consider integrating two important railway optimization problems, in particular the Rolling Stock Scheduling Problem and the Train Unit Shunting Problem. We present two similar branch-and-cut based approaches to solve this integrated problem and, in addition, provide a comparison......, sequential approach ends in infeasibility. Furthermore, for the considered instances, solutions are typically found within a few minutes, indicating the applicability of the methodology to short-term planning....

  6. High-Speed Train Stop-Schedule Optimization Based on Passenger Travel Convenience

    OpenAIRE

    Dingjun Chen; Shaoquan Ni; Chang’an Xu; Hongxia Lv; Simin Wang

    2016-01-01

    The stop-schedules for passenger trains are important to the operation planning of high-speed trains, and they decide the quality of passenger service and the transportation efficiency. This paper analyzes the specific manifestation of passenger travel convenience and proposes the concepts of interstation accessibility and degree of accessibility. In consideration of both the economic benefits of railway corporations and the travel convenience of passengers, a multitarget optimization model i...

  7. MOV reliability evaluation and periodic verification scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  8. MOV reliability evaluation and periodic verification scheduling

    International Nuclear Information System (INIS)

    Bunte, B.D.

    1996-01-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs

  9. A duty-period-based formulation of the airline crew scheduling problem

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, K.

    1994-12-31

    We present a new formulation of the airline crew scheduling problem that explicitly considers the duty periods. We suggest an algorithm for solving the formulation by a column generation approach with branch-and-bound. Computational results are reported for a number of test problems.

  10. Schedule and complex motion of shuttle bus induced by periodic inflow of passengers

    Science.gov (United States)

    Nagatani, Takashi; Naito, Yuichi

    2011-09-01

    We have studied the dynamic behavior of a bus in the shuttle bus transportation with a periodic inflow. A bus schedule is closely related to the dynamics. We present the modified circle map model for the dynamics of the shuttle bus. The motion of the shuttle bus depends on the loading parameter and the inflow period. The shuttle bus displays the periodic, quasi-periodic, and chaotic motions with varying both loading parameter and inflow rate.

  11. Safety Training: scheduled sessions in September and October 2011

    CERN Multimedia

    2011-01-01

    The following training courses are scheduled in September – October. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Alphabetical order (original course titles are maintained) Conduite de chariots élévateurs 17-OCT-11 to 18-OCT-11, 8.00 – 17.30, in French * Ergonomics - Applying ergonomic principles in the workplace 15-SEP-11, 9.00 – 12.30, in French 15-SEP-11, 14.00 – 17.30, in English Habilitation électrique : Personnel électricien effectuant des opérations du domaine de tension BTA...

  12. Safety Training: scheduled sessions in September and October 2011

    CERN Multimedia

    DGS Unit

    2011-01-01

    The following training courses are scheduled in September – October. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Alphabetical order (original course titles are maintained) Chemical Safety – Introduction 11-OCT-11, 9.00 – 11.30, in English Conduite de chariots élévateurs 17-OCT-11 to 18-OCT-11, 8.00 – 17.30, in French * Ergonomics - Applying ergonomic principles in the workplace 15-SEP-11, 9.00 – 12.30, in French 15-SEP-11, 14.00 – 17.30, in English Habilitation électrique : Personne...

  13. Work Scheduling by Use of Worker Model in Consideration of Learning by On-The-Job Training

    Science.gov (United States)

    Tateno, Toshitake; Shimizu, Keiko

    This paper deals with a method of scheduling manual work in consideration of learning by on-the-job training (OJT). In skilled work such as maintenance of trains and airplanes, workers must learn many tasks by OJT. While the work processing time of novice workers is longer than that of experts, the time will be reduced with repeated OJT. Therefore, OJT is important for maintaining the skill level and the long-term work efficiency of an organization. In order to devise a schedule considering OJT, the scheduler must incorporate a management function of workers to trace dynamically changing work experience. In this paper, after the relationship between scheduling problems and worker management problems is defined, a simulation method, in which a worker model and an agent-based mechanism are utilized, is proposed to derive the optimal OJT strategy toward high long-term performance. Finally, we present some case studies showing the effectiveness of OJT planning based on the simulation.

  14. JIT single machine scheduling problem with periodic preventive maintenance

    Science.gov (United States)

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-09-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.

  15. No Exacerbation of Knee Joint Pain and Effusion Following Preoperative Progressive Resistance Training in Patients Scheduled for Total Knee Arthroplasty: Secondary Analyses From a Randomized Controlled Trial.

    Science.gov (United States)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas; Søballe, Kjeld; Mechlenburg, Inger

    2017-11-09

    Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. To examine whether preoperative PRT initiated 5 weeks prior to TKA would exacerbate pain and knee effusion, and would allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. Secondary analyses from a randomized controlled trial. University Hospital and a Regional Hospital. A total of 30 patients who were scheduled for TKA due to osteoarthritis and assigned as the intervention group. Patients underwent unilateral PRT (3 sessions per week). Exercise loading was 12 repetitions maximum (RM) with progression toward 8 RM. The training program consisted of 6 exercises performed unilaterally. Before and after each training session, knee joint pain was rated on an 11-point scale, effusion was assessed by measuring the knee joint circumference, and training load was recorded. The first and last training sessions were initiated by 1 RM testing of unilateral leg press, unilateral knee extension, and unilateral knee flexion. The median pain change score from before to after each training session was 0 at all training sessions. The average increase in knee joint effusion across the 12 training sessions was a mean 0.16 cm ± 0.23 cm. No consistent increase in knee joint effusion after training sessions during the training period was found (P = .21). Training load generally increased, and maximal muscle strength improved as follows: unilateral leg press: 18% ± 30% (P = .03); unilateral knee extension: 81% ± 156% (P knee flexion: 53% ± 57% (P knee joint pain and effusion, despite a substantial progression in loading and increased muscle strength. Concerns for side effects such as pain and effusion after PRT seem unfounded. To be determined. Copyright © 2017. Published by Elsevier Inc.

  16. Schedules for home visits in the early postpartum period.

    Science.gov (United States)

    Yonemoto, Naohiro; Dowswell, Therese; Nagai, Shuko; Mori, Rintaro

    2017-08-02

    Maternal complications including psychological and mental health problems and neonatal morbidity have been commonly observed in the postpartum period. Home visits by health professionals or lay supporters in the weeks following the birth may prevent health problems from becoming chronic with long-term effects on women, their babies, and their families. To assess outcomes for women and babies of different home-visiting schedules during the early postpartum period. The review focuses on the frequency of home visits, the duration (when visits ended) and intensity, and on different types of home-visiting interventions. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (28 January 2013) and reference lists of retrieved articles. Randomised controlled trials (RCTs) (including cluster-RCTs) comparing different types of home-visiting interventions enrolling participants in the early postpartum period (up to 42 days after birth). We excluded studies in which women were enrolled and received an intervention during the antenatal period (even if the intervention continued into the postnatal period) and studies recruiting only women from specific high-risk groups. (e.g. women with alcohol or drug problems). Study eligibility was assessed by at least two review authors. Data extraction and assessment of risk of bias were carried out independently by at least two review authors. Data were entered into Review Manager software. We included data from 12 randomised trials with data for more than 11,000 women. The trials were carried out in countries across the world, and in both high- and low-resource settings. In low-resource settings women receiving usual care may have received no additional postnatal care after early hospital discharge.The interventions and control conditions varied considerably across studies with trials focusing on three broad types of comparisons: schedules involving more versus fewer postnatal home visits (five studies), schedules

  17. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    Science.gov (United States)

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  18. The impact of training schedules on the sleep and fatigue of elite athletes.

    Science.gov (United States)

    Sargent, Charli; Lastella, Michele; Halson, Shona L; Roach, Gregory D

    2014-12-01

    In any sport, successful performance requires a planned approach to training and recovery. While sleep is recognized as an essential component of this approach, the amount and quality of sleep routinely obtained by elite athletes has not been systematically evaluated. Data were collected from 70 nationally ranked athletes from seven different sports. Athletes wore wrist activity monitors and completed self-report sleep/training diaries for 2 weeks during normal training. The athletes also recorded their fatigue level prior to each training session using a 7-point scale. On average, the athletes spent 08:18 ± 01:12 h in bed, fell asleep at 23:06 ± 01:12 h, woke at 6:48 ± 01:30 h and obtained 06:30 ± 01:24 h of sleep per night. There was a marked difference in the athletes' sleep/wake behaviour on training days and rest days. Linear mixed model analyses revealed that on nights prior to training days, time spent in bed was significantly shorter (p = 0.001), sleep onset and offset times were significantly earlier (p sleep obtained was significantly less (p = 0.001), than on nights prior to rest days. Moreover, there was a significant effect of sleep duration on pre-training fatigue levels (p ≤ 0.01). Specifically, shorter sleep durations were associated with higher levels of pre-training fatigue. Taken together, these findings suggest that the amount of sleep an elite athlete obtains is dictated by their training schedule. In particular, early morning starts reduce sleep duration and increase pre-training fatigue levels. When designing schedules, coaches should be aware of the implications of the timing of training sessions for sleep and fatigue. In cases where early morning starts are unavoidable, countermeasures for minimizing sleep loss - such as strategic napping during the day and correct sleep hygiene practices at night - should be considered.

  19. Static Scheduling of Periodic Hardware Tasks with Precedence and Deadline Constraints on Reconfigurable Hardware Devices

    Directory of Open Access Journals (Sweden)

    Ikbel Belaid

    2011-01-01

    Full Text Available Task graph scheduling for reconfigurable hardware devices can be defined as finding a schedule for a set of periodic tasks with precedence, dependence, and deadline constraints as well as their optimal allocations on the available heterogeneous hardware resources. This paper proposes a new methodology comprising three main stages. Using these three main stages, dynamic partial reconfiguration and mixed integer programming, pipelined scheduling and efficient placement are achieved and enable parallel computing of the task graph on the reconfigurable devices by optimizing placement/scheduling quality. Experiments on an application of heterogeneous hardware tasks demonstrate an improvement of resource utilization of 12.45% of the available reconfigurable resources corresponding to a resource gain of 17.3% compared to a static design. The configuration overhead is reduced to 2% of the total running time. Due to pipelined scheduling, the task graph spanning is minimized by 4% compared to sequential execution of the graph.

  20. Effect of runway training on rat brain tyrosine hydroxylase: differential effect of continuous and partial reinforcement schedules.

    Science.gov (United States)

    Boarder, M R; Feldon, J; Gray, J A; Fillenz, M

    1979-12-01

    Previous experiments have implicated ascending noradrenergic systems in the development of the behavioural responses to different patterns of reward. In this report food deprived male Sprague--Dawley rats were trained to run a straight alley for good reward on a continuous reinforcement (CRF) or a partial reinforcement (PRF) schedule. Tyrosine hydroxylase measured in a partially solubilized preparation from hippocampus and hypothalamus at the end of acquisition was not different from controls, indicating that enzyme induction does not occur during either training schedules. However, hippocampal synaptosomal tyrosine hydroxylation rates from the CRF group was significantly higher than from either the PRF group or the handled controls. This indicates that at the end of the acquisition schedule the noradrenergic projection to hippocampus was more active in the CRF group than with the PRF group or the handled control.

  1. MODELLING TEMPORAL SCHEDULE OF URBAN TRAINS USING AGENT-BASED SIMULATION AND NSGA2-BASED MULTIOBJECTIVE OPTIMIZATION APPROACHES

    Directory of Open Access Journals (Sweden)

    M. Sahelgozin

    2015-12-01

    Full Text Available Increasing distances between locations of residence and services leads to a large number of daily commutes in urban areas. Developing subway systems has been taken into consideration of transportation managers as a response to this huge amount of travel demands. In developments of subway infrastructures, representing a temporal schedule for trains is an important task; because an appropriately designed timetable decreases Total passenger travel times, Total Operation Costs and Energy Consumption of trains. Since these variables are not positively correlated, subway scheduling is considered as a multi-criteria optimization problem. Therefore, proposing a proper solution for subway scheduling has been always a controversial issue. On the other hand, research on a phenomenon requires a summarized representation of the real world that is known as Model. In this study, it is attempted to model temporal schedule of urban trains that can be applied in Multi-Criteria Subway Schedule Optimization (MCSSO problems. At first, a conceptual framework is represented for MCSSO. Then, an agent-based simulation environment is implemented to perform Sensitivity Analysis (SA that is used to extract the interrelations between the framework components. These interrelations is then taken into account in order to construct the proposed model. In order to evaluate performance of the model in MCSSO problems, Tehran subway line no. 1 is considered as the case study. Results of the study show that the model was able to generate an acceptable distribution of Pareto-optimal solutions which are applicable in the real situations while solving a MCSSO is the goal. Also, the accuracy of the model in representing the operation of subway systems was significant.

  2. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  3. Sensitive periods in human development: evidence from musical training.

    Science.gov (United States)

    Penhune, Virginia B

    2011-10-01

    One of the primary goals of cognitive neuroscience is to understand the interaction between genes, development and specific experience. A particularly fascinating example of this interaction is a sensitive period - a time during development when experience has a differential effect on behavior and the brain. Behavioral and brain imaging studies in musicians have provided suggestive evidence for a possible sensitive period for musical training; showing that musicians who began training early show better task performance and greater changes in auditory and motor regions of the brain. However, these studies have not controlled for likely differences between early- (ET) and late-trained (LT) musicians in the number of years of musical experience. This review presents behavioral work from our laboratory comparing the performance of ET (before age seven) and LT musicians who were matched for years of experience on the ability to tap in synchrony with auditory and visual rhythms. The results demonstrate the existence of a possible sensitive period for musical training that has its greatest impact on measures of sensorimotor integration. Work on motor learning in children and how this might relate to the observed sensitive period effect is also reviewed. These studies are described in the context of what is currently known about sensitive periods in animals and humans; drawing on evidence from anatomy and physiology, studies of deafness, as well as structural and functional neuroimaging studies in trained musicians. The possible mechanisms underlying sensitive periods for musical training are discussed based on current theories describing the influence of both low-level features of sensory experience and higher-level cognitive processing. Copyright © 2011 Elsevier Srl. All rights reserved.

  4. Monitoring Training Loads in Professional Basketball Players Engaged in a Periodized Training Program.

    Science.gov (United States)

    Aoki, Marcelo S; Ronda, Lorena T; Marcelino, Pablo R; Drago, Gustavo; Carling, Chris; Bradley, Paul S; Moreira, Alexandre

    2017-02-01

    Aoki, MS, Ronda, LT, Marcelino, PR, Drago, G, Carling, C, Bradley, PS, and Moreira, A. Monitoring training loads in professional basketball players engaged in a periodized training program. J Strength Cond Res 31(2): 348-358, 2017-The aim of this study was to investigate the dynamics of external training load (eTL) and internal training load (iTL) during seasonal periods, and examine the effect of a periodized training program on physical performance in professional basketball players. Repeated measures for 9 players (28 ± 6 years; 199 ± 8 cm; 101 ± 12 kg) were collected from 45 training sessions, over a 6-week preseason phase and a 5-week in-season phase. Physical tests were conducted at baseline (T1), week 4 (T2), and week 9 (T3). Differences in means are presented as % ± confident limits. A very likely difference was observed during in-season compared with preseason for the eTL variables (measured by multivariable monitoring device), mechanical load (13.5 ± 8.8) and peak acceleration (11.0 ± 11.2), respectively. Regarding iTL responses, a very large decrement in TRIMP (most likely difference, -20.6 ± 3.8) and in session rating of perceived exertion training load (very likely difference, -14.2 ± 9.0) was detected from preseason to in-season. Physical performance improved from T1 to T3 for Yo-Yo intermittent recovery test 1 (62.2 ± 34.3, effect size [ES] > 1.2); countermovement jump (8.8 ± 6.1, ES > 0.6); and squat jump (14.8 ± 10.2, ES > 0.8). Heart rate (HR; %HRpeak) exercise responses during a submaximal running test decreased from T1 to T3 (3.2 ± 4.3, ES 1.2). These results provide valuable information to coaches about training loads and physical performance across different seasonal periods. The data demonstrate that both eTL and iTL measures should be monitored in association with physical tests, to provide a comprehensive understanding of the training process.

  5. An effective repetitive training schedule to achieve skill proficiency using a novel robotic virtual reality simulator.

    Science.gov (United States)

    Kang, Sung Gu; Ryu, Byung Ju; Yang, Kyung Sook; Ko, Young Hwii; Cho, Seok; Kang, Seok Ho; Patel, Vipul R; Cheon, Jun

    2015-01-01

    A robotic virtual reality simulator (Mimic dV-Trainer) can be a useful training method for the da Vinci surgical system. Herein, we investigate several repetitive training schedules and determine which is the most effective. A total of 30 medical students were enrolled and were divided into 3 groups according to the training schedule. Group 1 performed the task 1 hour daily for 4 consecutive days, group II performed the task on once per week for 1 hour for 4 consecutive weeks, and group III performed the task for 4 consecutive hours in 1 day. The effects of training were investigated by analyzing the number of repetitions and the time required to complete the "Tube 2" simulation task when the learning curve plateau was reached. The point at which participants reached a stable score was evaluated using the cumulative sum control graph. The average time to complete the task at the learning curve plateau was 150.3 seconds in group I, 171.9 seconds in group II, and 188.5 seconds in group III. The number of task repetitions required to reach the learning curve plateau was 45 repetitions in group I, 36 repetitions in group II, and 39 repetitions in group III. Therefore, there was continuous improvement in the time required to perform the task after 40 repetitions in group I only. There was a significant correlation between improvement in each trial interval and attempt, and the correlation coefficient (0.924) in group I was higher than that in group II (0.899) and group III (0.838). Daily 1-hour practice sessions performed for 4 consecutive days resulted in the best final score, continuous score improvement, and effective training while minimizing fatigue. This repetition schedule can be used for effectively training novices in future. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  6. Evaluation of interactive computerized training to teach parents to implement photographic activity schedules with children with autism spectrum disorder.

    Science.gov (United States)

    Gerencser, Kristina R; Higbee, Thomas S; Akers, Jessica S; Contreras, Bethany P

    2017-07-01

    Training parents of children with autism spectrum disorder can be a challenge due to limited resources, time, and money. Interactive computerized training (ICT)-a self-paced program that incorporates instructions, videos, and interactive questions-is one method professionals can use to disseminate trainings to broader populations. This study extends previous research on ICT by assessing the effect of ICT to teach three parents how to implement a photographic activity schedule using a systematic prompting procedure with their child. Following ICT, all parents increased their fidelity to implementation of an activity schedule during role-play sessions with an adult. Fidelity remained high during implementation with their child and maintained during a 2-week follow-up. © 2017 Society for the Experimental Analysis of Behavior.

  7. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled

    CERN Multimedia

    2006-01-01

    Course Sessions (October 2006-March 2007) The Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the PERL, C++, OO and Java course series there are some places available on the following course sessions, currently scheduled until March 2007: Object-Oriented Analysis and Design using UML: 17-19 October 2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 19-20 October 2006 (2 days) JAVA - Level 1: 30 October -1 November 2006 (3 days) PERL 5 - Advanced Aspects: 2 November 2006 (1 day) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16 November 2006 (3 days) JAVA - Level 2: 4-7 December 2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15 December 2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 18-20 December 2006 (3 days) C++ for Particle Physicists:...

  8. Integrated Optimization of Service-Oriented Train Plan and Schedule on Intercity Rail Network with Varying Demand

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2015-01-01

    Full Text Available For a better service level of a train operating plan, we propose an integrated optimization method of train planning and train scheduling, which generally are optimized, respectively. Based on the cost analysis of both passengers travelling and enterprises operation, and the constraint analysis of trains operation, we construct a multiobjective function and build an integrated optimization model with the aim of reducing both passenger travel costs and enterprise operating costs. Then, a solving algorithm is established based on the simulated annealing algorithm. Finally, using as an example the Changzhutan intercity rail network, as an example we analyze the optimized results and the influence of the model parameters on the results.

  9. Workforce scheduling: A new model incorporating human factors

    Directory of Open Access Journals (Sweden)

    Mohammed Othman

    2012-12-01

    Full Text Available Purpose: The majority of a company’s improvement comes when the right workers with the right skills, behaviors and capacities are deployed appropriately throughout a company. This paper considers a workforce scheduling model including human aspects such as skills, training, workers’ personalities, workers’ breaks and workers’ fatigue and recovery levels. This model helps to minimize the hiring, firing, training and overtime costs, minimize the number of fired workers with high performance, minimize the break time and minimize the average worker’s fatigue level.Design/methodology/approach: To achieve this objective, a multi objective mixed integer programming model is developed to determine the amount of hiring, firing, training and overtime for each worker type.Findings: The results indicate that the worker differences should be considered in workforce scheduling to generate realistic plans with minimum costs. This paper also investigates the effects of human fatigue and recovery on the performance of the production systems.Research limitations/implications: In this research, there are some assumptions that might affect the accuracy of the model such as the assumption of certainty of the demand in each period, and the linearity function of Fatigue accumulation and recovery curves. These assumptions can be relaxed in future work.Originality/value: In this research, a new model for integrating workers’ differences with workforce scheduling is proposed. To the authors' knowledge, it is the first time to study the effects of different important human factors such as human personality, skills and fatigue and recovery in the workforce scheduling process. This research shows that considering both technical and human factors together can reduce the costs in manufacturing systems and ensure the safety of the workers.

  10. Elevated Serum Hepcidin Levels during an Intensified Training Period in Well-Trained Female Long-Distance Runners

    Directory of Open Access Journals (Sweden)

    Aya Ishibashi

    2017-03-01

    Full Text Available Iron is essential for providing oxygen to working muscles during exercise, and iron deficiency leads to decreased exercise capacity during endurance events. However, the mechanism of iron deficiency among endurance athletes remains unclear. In this study, we compared iron status between two periods involving different training regimens. Sixteen female long-distance runners participated. Over a seven-month period, fasting blood samples were collected during their regular training period (LOW; middle of February and during an intensified training period (INT; late of August to determine blood hematological, iron, and inflammatory parameters. Three-day food diaries were also assessed. Body weight and lean body mass did not differ significantly between LOW and INT, while body fat and body fat percentage were significantly lower in INT (p < 0.05. Blood hemoglobin, serum ferritin, total protein, and iron levels, total iron-binding capacity, and transferrin saturation did not differ significantly between the two periods. Serum hepcidin levels were significantly higher during INT than LOW (p < 0.05. Carbohydrate and iron intakes from the daily diet were significantly higher during INT than LOW (p < 0.05. In conclusion, an elevated hepcidin level was observed during an intensified training period in long-distance runners, despite an apparently adequate daily intake of iron.

  11. On the optimal scheduling of periodic tests and maintenance for reliable redundant components

    International Nuclear Information System (INIS)

    Courtois, Pierre-Jacques; Delsarte, Philippe

    2006-01-01

    Periodically, some m of the n redundant components of a dependable system may have to be taken out of service for inspection, testing or preventive maintenance. The system is then constrained to operate with lower (n-m) redundancy and thus with less reliability during these periods. However, more frequent periodic inspections decrease the probability that a component fail undetected in the time interval between successive inspections. An optimal time schedule of periodic preventive operations arises from these two conflicting factors, balancing the loss of redundancy during inspections against the reliability benefits of more frequent inspections. Considering no other factor than this decreased redundancy at inspection time, this paper demonstrates the existence of an optimal interval between inspections, which maximizes the mean time between system failures. By suitable transformations and variable identifications, an analytic closed form expression of the optimum is obtained for the general (m, n) case. The optimum is shown to be unique within the ranges of parameter values valid in practice; its expression is easy to evaluate and shown to be useful to analyze and understand the influence of these parameters. Inspections are assumed to be perfect, i.e. they cause no component failure by themselves and leave no failure undetected. In this sense, the optimum determines a lowest bound for the system failure rate that can be achieved by a system of n-redundant components, m of which require for inspection or maintenance recurrent periods of unavailability of length t. The model and its general closed form solution are believed to be new . Previous work had computed optimal values for an estimation of a time average of system unavailability, but by numerical procedures only and with different numerical approximations, other objectives and model assumptions (one component only inspected at a time), and taking into account failures caused by testing itself, repair and

  12. Elevated Serum Hepcidin Levels during an Intensified Training Period in Well-Trained Female Long-Distance Runners.

    Science.gov (United States)

    Ishibashi, Aya; Maeda, Naho; Sumi, Daichi; Goto, Kazushige

    2017-03-14

    Iron is essential for providing oxygen to working muscles during exercise, and iron deficiency leads to decreased exercise capacity during endurance events. However, the mechanism of iron deficiency among endurance athletes remains unclear. In this study, we compared iron status between two periods involving different training regimens. Sixteen female long-distance runners participated. Over a seven-month period, fasting blood samples were collected during their regular training period (LOW; middle of February) and during an intensified training period (INT; late of August) to determine blood hematological, iron, and inflammatory parameters. Three-day food diaries were also assessed. Body weight and lean body mass did not differ significantly between LOW and INT, while body fat and body fat percentage were significantly lower in INT ( p daily diet were significantly higher during INT than LOW ( p daily intake of iron.

  13. Locomotive Schedule Optimization for Da-qin Heavy Haul Railway

    Directory of Open Access Journals (Sweden)

    Ruiye Su

    2015-01-01

    Full Text Available The main difference between locomotive schedule of heavy haul railways and that of regular rail transportation is the number of locomotives utilized for one train. One heavy-loaded train usually has more than one locomotive, but a regular train only has one. This paper develops an optimization model for the multilocomotive scheduling problem (MLSP through analyzing the current locomotive schedule of Da-qin Railway. The objective function of our paper is to minimize the total number of utilized locomotives. The MLSP is nondeterministic polynomial (NP hard. Therefore, we convert the multilocomotive traction problem into a single-locomotive traction problem. Then, the single-locomotive traction problem (SLTP can be converted into an assignment problem. The Hungarian algorithm is applied to solve the model and obtain the optimal locomotive schedule. We use the variance of detention time of locomotives at stations to evaluate the stability of locomotive schedule. In order to evaluate the effectiveness of the proposed optimization model, case studies for 20 kt and 30 kt heavy-loaded combined trains on Da-qin Railway are both conducted. Compared to the current schedules, the optimal schedules from the proposed models can save 62 and 47 locomotives for 20 kt and 30 kt heavy-loaded combined trains, respectively. Therefore, the effectiveness of the proposed model and its solution algorithm are both valid.

  14. Specific features of elite bodybuilders’ training process in competition period

    Directory of Open Access Journals (Sweden)

    A.A. Tihorsky

    2016-12-01

    Full Text Available Purpose: To substantiate methodic of training process construction for elite bodybuilders in competition period with usage of different training methods. Material: elite bodybuilders - members of combined team of Ukraine (n=16 participated in the research. Results: we presented comparative characteristic of the most often used bodybuilding training methodic. Besides, optimal training methodic in competition period was worked out and substantiated. Such methodic permits to improve body proportions at the account of fat layer reduction. By the data of Harvard step-test the sportsmen improved organism’s functional potentials by 6%. Conclusions: the offered methodic noticeably reduces probability of functional unfavorable states (over-training, overloading, traumas. The methodic permits to achieve the required sport form without over-tension adaptation-compensatory mechanisms and acquire maximal muscular relief; improve proportions with minimal losses of muscles’ volume.

  15. High-intensity preoperative training improves physical and functional recovery in the early post-operative periods after total knee arthroplasty

    DEFF Research Database (Denmark)

    Calatayud, Joaquin; Casaña, Jose; Ezzatvar, Yasmin

    2017-01-01

    the preoperative period reduces pain and improves lower limb muscle strength, ROM and functional task performance before surgery, resulting in a reduced length of stay at the hospital and a faster physical and functional recovery after TKA. The present training programme can be used by specialists to speed up......-four subjects (7 men, 37 women) scheduled for unilateral TKA for osteoarthritis (OA) during 2014 participated in this randomized controlled trial. Western Ontario and McMaster Universities Osteoarthritis Index (WOMAC), the Physical Functioning Scale of the Short Form-36 questionnaire (SF-36), a 10-cm visual...... analogue scale (VAS), isometric knee flexion, isometric knee extension, isometric hip abduction, active knee range of motion and functional tasks (Timed Up and Go test and Stair ascent-descent test) were assessed at 8 weeks before surgery (T1), after 8 weeks of training (T2), 1 month after TKA (T3...

  16. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  17. Elastic Bands as a Component of Periodized Resistance Training.

    Science.gov (United States)

    Joy, Jordan M; Lowery, Ryan P; Oliveira de Souza, Eduardo; Wilson, Jacob M

    2016-08-01

    Joy, JM, Lowery, RP, Oliveira de Souza, E, and Wilson, JM. Elastic bands as a component of periodized resistance training. J Strength Cond Res 30(8): 2100-2106, 2016-Variable resistance training (VRT) has recently become a component of strength and conditioning programs. Prior research has demonstrated increases in power and/or strength using low loads of variable resistance. However, no study has examined using high loads of variable resistance as a part of a periodized training protocol to examine VRT within the context of a periodized training program and to examine a greater load of variable resistance than has been examined in prior research. Fourteen National Collegiate Athletic Association division II male basketball players were recruited for this study. Athletes were divided equally into either a variable resistance or control group. The variable resistance group added 30% of their 1 repetition maximum (1RM) as band tension to their prescribed weight 1 session per week. Rate of power development (RPD), peak power, strength, body composition, and vertical jump height were measured pretreatment and posttreatment. No baseline differences were observed between groups for any measurement of strength, power, or body composition. A significant group by time interaction was observed for RPD, in which RPD was greater in VRT posttraining than in the control group. Significant time effects were observed for all other variables including squat 1RM, bench press 1RM, deadlift 1RM, clean 3RM, vertical jump, and lean mass. Although there were no significant group ×-time interactions, the VRT group's percent changes and effect sizes indicate a larger treatment effect in the squat and bench press 1RM values and the vertical jump performed on the force plate and vertec. These results suggest that when using variable resistance as a component of a periodized training program, power and strength can be enhanced. Therefore, athletes who add variable resistance to 1 training

  18. Impact of Train Schedule on Pedestrian Movement on Stairway at Suburban Rail Transit Station in Mumbai, India

    Directory of Open Access Journals (Sweden)

    Shah Jiten

    2015-01-01

    Full Text Available Pedestrian flow takes place in confined environment on stairways under the influence of composition, direction of movement, and schedule of trains. During peak-period, alighting and boarding rate is quite high resulting in very high pedestrian movement from one platform to the other to catch the next train at interchange stations. The transfer of passengers from railway platforms through common undivided stairways becomes difficult, uncomfortable, and unsafe at times when pedestrian flow reaches the capacity level. Understanding of criteria defining quality of flow that affect the effectiveness of facilities like stairways in handling the pedestrian traffic is vital for planning and designing of such facilities to ensure the desired level of service as well as safety in case of emergency. The present paper is based on the study of pedestrian movement on stairways at busy suburban rail transit interchange station at Dadar in Mumbai, India. Pedestrian movements are captured through videography at two stairways and the effect of bidirectional movement on average walking speed is analyzed. The ascending flow in small proportion is found to be more influential in causing speed reduction on undivided stairways. The outcome of the study is useful for capacity and level of service analysis while planning and designing the transit station stairways.

  19. The influence of different training schedules on the learning of psychomotor skills for endoscopic surgery.

    Science.gov (United States)

    Verdaasdonk, E G G; Stassen, L P S; van Wijk, R P J; Dankelman, J

    2007-02-01

    Psychomotor skills for endoscopic surgery can be trained with virtual reality simulators. Distributed training is more effective than massed training, but it is unclear whether distributed training over several days is more effective than distributed training within 1 day. This study aimed to determine which of these two options is the most effective for training endoscopic psychomotor skills. Students with no endoscopic experience were randomly assigned either to distributed training on 3 consecutive days (group A, n = 10) or distributed training within 1 day (group B, n = 10). For this study the SIMENDO virtual reality simulator for endoscopic skills was used. The training involved 12 repetitions of three different exercises (drop balls, needle manipulation, 30 degree endoscope) in differently distributed training schedules. All the participants performed a posttraining test (posttest) for the trained tasks 7 days after the training. The parameters measured were time, nontarget environment collisions, and instrument path length. There were no significant differences between the groups in the first training session for all the parameters. In the posttest, group A (training over several days) performed 18.7% faster than group B (training on 1 day) (p = 0.013). The collision and path length scores for group A did not differ significantly from the scores for group B. The distributed group trained over several days was faster, with the same number of errors and the same instrument path length used. Psychomotor skill training for endoscopic surgery distributed over several days is superior to training on 1 day.

  20. Construction training process of highly skilled players in mini-football for competition period

    Directory of Open Access Journals (Sweden)

    Stasiuk I.I.

    2013-08-01

    Full Text Available Analyzed the structure and content of the competition period in mini-football. It was determined that the structure of the competition period consists of 4 competitive mesocycles. In each mesocycle includes various types of micro-cycles (competitive, cross-game and rehabilitation. Reflects the ratio of specific and non-specific (general preparations means training work. So in the competitive period for competitive mesocycles general preparations exercises ranged from 38.3 to 42.4%, special-preparation - from 29.9 to 32.6%, competitive - from 20.9 to 23.3%. The intensity of the training load in intergame microcycles less than competitive. This corresponds to the strategy of building the training process in the competitive period. During the competition period the ratio of the training load was: aerobic focus - 49.2%, mixed - 46.1%, anaerobic alactate - 2.4%, anaerobic glycolytic - 2.3%. Defines the scope and focus of the training load: longer the aerobic work, then - mixed, anaerobic- alactate and anaerobic-glycolytic. The comparative characteristics of the intensity of the training load in competitive and intergame microcycles.

  1. Case study: Nutrition and training periodization in three elite marathon runners.

    Science.gov (United States)

    Stellingwerf, Trent

    2012-10-01

    Laboratory-based studies demonstrate that fueling (carbohydrate; CHO) and fluid strategies can enhance training adaptations and race-day performance in endurance athletes. Thus, the aim of this case study was to characterize several periodized training and nutrition approaches leading to individualized race-day fluid and fueling plans for 3 elite male marathoners. The athletes kept detailed training logs on training volume, pace, and subjective ratings of perceived exertion (RPE) for each training session over 16 wk before race day. Training impulse/load calculations (TRIMP; min × RPE = load [arbitrary units; AU]) and 2 central nutritional techniques were implemented: periodic low-CHO-availability training and individualized CHO- and fluid-intake assessments. Athletes averaged ~13 training sessions per week for a total average training volume of 182 km/wk and peak volume of 231 km/wk. Weekly TRIMP peaked at 4,437 AU (Wk 9), with a low of 1,887 AU (Wk 16) and an average of 3,082 ± 646 AU. Of the 606 total training sessions, ~74%, 11%, and 15% were completed at an intensity in Zone 1 (very easy to somewhat hard), Zone 2 (at lactate threshold) and Zone 3 (very hard to maximal), respectively. There were 2.5 ± 2.3 low-CHO-availability training bouts per week. On race day athletes consumed 61 ± 15 g CHO in 604 ± 156 ml/hr (10.1% ± 0.3% CHO solution) in the following format: ~15 g CHO in ~150 ml every ~15 min of racing. Their resultant marathon times were 2:11:23, 2:12:39 (both personal bests), and 2:16:17 (a marathon debut). Taken together, these periodized training and nutrition approaches were successfully applied to elite marathoners in training and competition.

  2. Crew Scheduling Considering both Crew Duty Time Difference and Cost on Urban Rail System

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2016-11-01

    Full Text Available Urban rail crew scheduling problem is to allocate train services to crews based on a given train timetable while satisfying all the operational and contractual requirements. In this paper, we present a new mathematical programming model with the aim of minimizing both the related costs of crew duty and the variance of duty time spreads. In addition to iincorporating the commonly encountered crew scheduling constraints, it also takes into consideration the constraint of arranging crews having a meal in the specific meal period of one day rather than after a minimum continual service time. The proposed model is solved by an ant colony algorithm which is built based on the construction of ant travel network and the design of ant travel path choosing strategy. The performances of the model and the algorithm are evaluated by conducting case study on Changsha urban rail. The results indicate that the proposed method can obtain a satisfactory crew schedule for urban rails with a relatively small computational time.

  3. Self-education activities features of primary school teachers in the period between training courses.

    Directory of Open Access Journals (Sweden)

    Nalyvaiko G.V.

    2011-08-01

    Full Text Available The article describes self-education activities features of primary school teachers in the period between training courses. The basic conditions and areas of self-education activities features of primary school teachers in the period between training courses is singled out. The interpretations of the self-education definition are considered. The primary school teachers' self-education activities components are carried out. The period between training courses in training primary school teachers is defined.

  4. CERN Technical Training 2006: Office Software Curriculum Scheduled Course Sessions (October-December 2006)

    CERN Multimedia

    2006-01-01

    The Office Software Curriculum of the CERN Technical Training Programme currently offers comprehensive training in Microsoft Office (Word, Excel, Powerpoint, Access, Outlook), MS Project, Frontpage, Dreamweaver, Indesign, LaTeX, and CERN EDMS. There are some places available on the following Microsoft Office 2003 course sessions, currently scheduled until December 2007: EXCEL 2003 - niveau 2 : ECDL - 16-17 October (2 days, session in French) WORD 2003 (Short Course II) - HowTo... Mail merge - 2 November (morning, bilingual session) WORD 2003 (Short Course IV) - HowTo... Work with master document - 2 November (afternoon, bilingual session) OUTLOOK 2003 (Short Course III) - Meetings and Delegation - 3 November (morning, bilingual session) EXCEL 2003 (Short Course IV) - HowTo... Link cells, worksheets and workbooks - 3 November (afternoon, bilingual session) EXCEL 2003 - Level 1: ECDL - 13-14 November (2 days, session in English) ACCESS 2003 - Level 2: ECDL - 5-6 December (2 days, session in English) The abo...

  5. How shift scheduling practices contribute to fatigue amongst freight rail operating employees: Findings from Canadian accident investigations.

    Science.gov (United States)

    Rudin-Brown, Christina M; Harris, Sarah; Rosberg, Ari

    2018-02-01

    Canada's freight rail system moves 70% of the country's surface goods and almost half of all exports (RAC, 2016). These include dangerous goods. Anonymous survey of freight rail operating employees conducted by the Teamsters Canada Rail Conference (TCRC, 2014) revealed that many do not report getting enough sleep because of their work schedules, and that fatigue may be affecting their performance at work. Besides general impairments in attention and cognitive functioning, fatigue in railway operating employees slows reaction time to safety alarms and impairs conformance to train operating requirements. Shift scheduling practices can contribute to sleep-related fatigue by restricting sleep opportunities, requiring extended periods of wakefulness and by disrupting daily (circadian) rhythms. The primary goal of accident investigation is to identify causal and contributing factors so that similar occurrences can be prevented. A database search of Transportation Safety Board (TSB) rail investigation reports published in the 21-year period from 1995 to 2015 identified 18 that cited sleep-related fatigue of freight rail operating employees as a causal, contributing, or risk finding. This number represents about 20% of TSB rail investigations from the same period in which a human factors aspect of freight train activities was a primary cause. Exploration of accident themes suggests that management of fatigue and shift scheduling in the freight rail industry is a complex issue that is often not conducive to employee circadian rhythms and sleep requirements. It also suggests that current shift scheduling and fatigue management practices may be insufficient to mitigate the associated safety risk. Railway fatigue management systems that are based on the principles of modern sleep science are needed to improve scheduling practices and mitigate the ongoing safety risk. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  6. Peculiarities of perfection of training process of the qualified bodybuilder in the competitive period

    Directory of Open Access Journals (Sweden)

    V.Yu. Dzhym

    2015-02-01

    Full Text Available Purpose: study methods of improving the training process of skilled bodybuilders in the competitive period. Material : The study involved 18 athletes aged 18-25 years old. The experiment was conducted for 8 weeks. Used two variants of training techniques: large percentage weights; with smooth dynamics with emphasis on static load muscles. Efficacy was evaluated using the preparation method of expert evaluations. The method involved the use of information on the implementation of directives coach dynamics of power and endurance performance, subjective indicators (health, mood, desire to train. Results : comparative characteristic of the most commonly used methods of training process in bodybuilding. Developed and justified best practices, depending on the initial form of the athlete at the beginning of the competition period of training. Shows the dependence of changes in body weight of the athlete training. Conclusions : the proposed best practices, depending on the microcycle training in the competitive period (precompetitive and competitive mesocycles.

  7. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled Course Sessions (October-December 2006)

    CERN Multimedia

    2006-01-01

    he Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the PERL, C++, OO and Java course series there are some places available on the following course sessions, scheduled until the end of this year: Object-Oriented Analysis and Design using UML: 17-19 October 2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 19-20 October 2006 (2 days) JAVA - Level 1: 30 Oct. -1 Nov. 2006 (3 days) PERL 5 - Advanced Aspects: 2 November 2006 (1 day) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16 November 2006 (3 days) JAVA - Level 2: 4-7 December 2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15 December 2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans : 18.20 December 2006 (3 days) All the above sessions will be given in English, at the CERN Training Centre....

  8. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  9. An Integrated, Multifactorial Approach to Periodization for Optimal Performance in Individual and Team Sports.

    Science.gov (United States)

    Mujika, Iñigo; Halson, Shona; Burke, Louise M; Balagué, Gloria; Farrow, Damian

    2018-05-01

    Sports periodization has traditionally focused on the exercise aspect of athletic preparation, while neglecting the integration of other elements that can impact an athlete's readiness for peak competition performances. Integrated periodization allows the coordinated inclusion of multiple training components best suited for a given training phase into an athlete's program. The aim of this article is to review the available evidence underpinning integrated periodization, focusing on exercise training, recovery, nutrition, psychological skills, and skill acquisition as key factors by which athletic preparation can be periodized. The periodization of heat and altitude adaptation, body composition, and physical therapy is also considered. Despite recent criticism, various methods of exercise training periodization can contribute to performance enhancement in a variety of elite individual and team sports, such as soccer. In the latter, both physical and strategic periodization are useful tools for managing the heavy travel schedule, fatigue, and injuries that occur throughout a competitive season. Recovery interventions should be periodized (ie, withheld or emphasized) to influence acute and chronic training adaptation and performance. Nutrient intake and timing in relation to exercise and as part of the periodization of an athlete's training and competition calendar can also promote physiological adaptations and performance capacity. Psychological skills are a central component of athletic performance, and their periodization should cater to each athlete's individual needs and the needs of the team. Skill acquisition can also be integrated into an athlete's periodized training program to make a significant contribution to competition performance.

  10. Progressive-overload whole-body vibration training as part of periodized, off-season strength training in trained women athletes.

    Science.gov (United States)

    Jones, Margaret T

    2014-09-01

    The purpose was to examine the effects of progressive-overload, whole-body vibration (WBV) training on strength and power as part of a 15-week periodized, strength training (ST) program. Eighteen collegiate women athletes with ≥1 year of ST and no prior WBV training participated in the crossover design. Random assignment to 1 of the 2 groups followed pretests of seated medicine ball throw (SMBT), single-leg hop for distance (LSLH, RSLH), countermovement jump (CMJ), 3 repetition maximum (3RM) front squat (FS), pull-up (PU), and 3RM bench press (BP). Whole-body vibration was two 3-week phases of dynamic and static hold body weight exercises administered 2 d·wk in ST sessions throughout the 15-week off-season program. Total WBV exposure was 6 minutes broken into 30-second bouts with 60-second rest (1:2 work-to-relief ratio). Exercises, frequency, and amplitude progressed in intensity from the first 3-week WBV training to the second 3-week phase. Repeated-measures analysis of variances were used to analyze the SMBT, CMJ, LSLH, RSLH, FS, PU, and BP tests. Alpha level was p ≤ 0.05. Front squat, LSLH, and RSLH increased (p = 0.001) from pre- to posttest; FS increased from mid- to posttest. Pull-up increased (p = 0.008) from pre- to posttest. Seated medicine ball throw and BP showed a trend of increased performance from pre- to posttest (p = 0.11). Two 3-week phases of periodized, progressive-overload WBV + ST training elicited gains in strength and power during a 15-week off-season program. Greatest improvements in performance tests occurred in the initial WBV phase. Implementing WBV in conjunction with ST appears to be more effective in the early phases of training.

  11. Sprint Running Performance and Technique Changes in Athletes During Periodized Training: An Elite Training Group Case Study.

    Science.gov (United States)

    Bezodis, Ian N; Kerwin, David G; Cooper, Stephen-Mark; Salo, Aki I T

    2017-11-15

    To understand how training periodization influences sprint performance and key step characteristics over an extended training period in an elite sprint training group. Four sprinters were studied during five months of training. Step velocities, step lengths and step frequencies were measured from video of the maximum velocity phase of training sprints. Bootstrapped mean values were calculated for each athlete for each session and 139 within-athlete, between-session comparisons were made with a repeated measures ANOVA. As training progressed, a link in the changes in velocity and step frequency was maintained. There were 71 between-session comparisons with a change in step velocity yielding at least a large effect size (>1.2), of which 73% had a correspondingly large change in step frequency in the same direction. Within-athlete mean session step length remained relatively constant throughout. Reductions in step velocity and frequency occurred during training phases of high volume lifting and running, with subsequent increases in step velocity and frequency happening during phases of low volume lifting and high intensity sprint work. The importance of step frequency over step length to the changes in performance within a training year was clearly evident for the sprinters studied. Understanding the magnitudes and timings of these changes in relation to the training program is important for coaches and athletes. The underpinning neuro-muscular mechanisms require further investigation, but are likely explained by an increase in force producing capability followed by an increase in the ability to produce that force rapidly.

  12. In-season training periodization of professional soccer players

    Directory of Open Access Journals (Sweden)

    A Los Arcos

    2017-04-01

    Full Text Available The aim of this study was to quantify the seasonal perceived respiratory and muscular training loads (i.e., sRPEres-TL and sRPEmus-TL completed by elite-oriented young professional soccer players. Twentyfour players (20.3 ± 2.0 years belonging to the same reserve team of a Spanish La Liga club participated in this study. Only the players that were available to train for a whole week with the team and also to play the weekly game were considered: Starters, players that participated in the match for at least 45 min and Non- Starters, players that did not participate or played less than 45 minutes in the match. The competitive period was analysed after the division into 5x6-8 week blocks and 35x1 week microcycles. Data were also analysed with respect to number of days before the immediate match. Weekly TL variation across the in-season blocks was trivial-small for both groups except between Block 2 and Block 3 (ES= moderate. Substantial TL differences (ES= small–very likely were found between training days, the TL pattern being a progressive increase up to MD-3 followed by a decrease until MD-1. Except for the match, sRPEres-/sRPEmus-TL was very similar between Starters and Non-Starters. In summary, perceived TL across the season displayed limited variation. Coaches periodized training contents to attain the highest weekly TL 72 hours before the match to progressively unload the players between MD-3 and the match day. The data revealed that the TL arising from the weekly game was solely responsible for the observed higher weekly TL of Starters in comparison with Non-Starters.

  13. Repetition Performance And Blood Lactate Responses Adopting Different Recovery Periods Between Training Sessions In Trained Men.

    Science.gov (United States)

    Miranda, Humberto; de Freitas Maia, Marianna; Paz, Gabriel Andrade; de Souza, João A A A; Simão, Roberto; de Araújo Farias, Déborah; Willardson, Jeffrey M

    2017-02-08

    The purpose of this study was to examine the effect of different recovery periods (24h, 48h, and 72h) between repeated resistance training (RT) sessions for the upper body muscles on repetition performance and blood lactate responses in trained men. Sixteen recreationally trained men (age: 26.1 ± 3.1 years; height: 179 ± 4.5 cm; body mass: 82.6 ± 4.0 kg, 4.5 ± 2.2 years of RT experience) participated in this study. Eight-repetition maximum (8-RM) loads were determined for the bench press (BP), 30° incline bench press (BP30), and 45° incline bench press (BP45) exercises. To assess the effects of different recovery periods between repeated training sessions, three protocols were performed in randomized order, including: 24 hours (P24); 48 hours (P48); and 72 hours (P72). Each RT session consisted of performing four repetition maximum sets of BP, BP30, and BP45 with 8-RM loads and 2-minute rest intervals between sets. Blood lactate levels were measured pre-session (PRE), immediately post-session (POST), 3 minutes post-session (P3), and 5 minutes post-session (P5). For the P24 protocol, significant decreases in repetition performance were found between sessions for the BP, BP30, and BP45 exercises, respectively. When considering session 2 only, the total work (repetition x sets) was significantly higher in P48 and P72 versus P24 for the BP30 and BP45 exercises. Blood lactate levels (i.e. POST, P3, and P5) significantly increased for session 2 under the P24 compared to the P48 and P72 protocols, respectively. Therefore, coaches and practitioners who need to accomplish a higher training volume for the upper body muscles should adopt recovery periods longer than 24 hours between sessions that train the same or similar muscle groups.

  14. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    2014-01-01

    significant practical implications, is the minimization of the TDM schedule period by over-provisioning bandwidth to connections with the smallest bandwidth requirements. Our results show that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different...... applications from the MCSL NOC benchmark suite. In the special case of all-to-all communication with equal bandwidths on all communication channels, we obtain schedules with a shorter period than reported in previous work....

  15. Monitoring training load, recovery-stress state, immune-endocrine responses, and physical performance in elite female basketball players during a periodized training program.

    Science.gov (United States)

    Nunes, João A; Moreira, Alexandre; Crewther, Blair T; Nosaka, Ken; Viveiros, Luis; Aoki, Marcelo S

    2014-10-01

    This study investigated the effect of a periodized training program on internal training load (ITL), recovery-stress state, immune-endocrine responses, and physical performance in 19 elite female basketball players. The participants were monitored across a 12-week period before an international championship, which included 2 overloading and tapering phases. The first overloading phase (fourth to sixth week) was followed by a 1-week tapering, and the second overloading phase (eighth to 10th week) was followed by a 2-week tapering. ITL (session rating of perceived exertion method) and recovery-stress state (RESTQ-76 Sport questionnaire) were assessed weekly and bi-weekly, respectively. Pretraining and posttraining assessments included measures of salivary IgA, testosterone and cortisol concentrations, strength, jumping power, running endurance, and agility. Internal training load increased across all weeks from 2 to 11 (p ≤ 0.05). After the first tapering period (week 7), a further increase in ITL was observed during the second overloading phase (p ≤ 0.05). After the second tapering period, a decrease in ITL was detected (p ≤ 0.05). A disturbance in athlete stress-recovery state was noted during the second overloading period (p ≤ 0.05), before returning to baseline level in end of the second tapering period. The training program led to significant improvements in the physical performance parameters evaluated. The salivary measures did not change despite the fluctuations in ITL. In conclusion, a periodized training program evoked changes in ITL in elite female basketball players, which appeared to influence their recovery-stress state. The training plan was effective in preparing participants for competition, as indicated by improvements in recovery-stress state and physical performance after tapering.

  16. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  17. SOME BIOCHEMICAL BLOOD CONSTANTS EVOLUTION IN REPORT TO THE TRAINING SCHEDULE STAGE IN SPORT HORSES

    Directory of Open Access Journals (Sweden)

    FLAVIA BOCHIS

    2008-10-01

    Full Text Available To determine whether a clinical examination was adequate to assess the fitness of horses in a fence course riding, and to characterize the relationship between a clinical assessment of the horse's fitness, training schedule stage and its blood biochemistry, 22 horses were monitored before (S1, during training, immediately after warming-up (S2 and after an E level fence obstacle course ride (S3. The blood samples were taken from the jugular vein in the above three mentioned phases, for the determination of total protein (g/dl, nitrogen (mg/dl, glucose (mg/dl, lactic acid (nmol/l, calcium (mg/dl, cholesterol (mg/dl and phosphorus (mg/dl. The intend of the paper is to present the obtained results as a reference study for the appropriate use by clinicians, sport horses owners and trainers in view to have a solid base in evaluation, for the adequate protection of health and welfare of the jumper horses competitors.

  18. Medicare program; payment policies under the physician fee schedule, five-year review of work relative value units, clinical laboratory fee schedule: signature on requisition, and other revisions to part B for CY 2012. Final rule with comment period.

    Science.gov (United States)

    2011-11-28

    This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.

  19. Determining the effect of periodic training on the basic psychomotor skills of nursing students.

    Science.gov (United States)

    Öztürk, Deniz; Çalışkan, Nurcan; Baykara, Zehra Gocmen; Karadağ, Ayise; Karabulut, Hatice

    2015-02-01

    Basic psychomotor skill training starts in the first year in nursing education. The psychomotor skills taught in the first year of nursing training constitute a foundation for all professional practices. Conducting periodic training for skills with which students are deficient can support mastery learning. The study was conducted as an interventional study for determining the effect of periodic training on the basic psychomotor skills learned in the Fundamentals of Nursing course. The sample consisted of 70 students attending the Fundamentals of Nursing course at nursing students in a university in Ankara, over 4 years between 2010 and 2013. The study was conducted as an interventional study for a period of 4 years. The data were collected through a questionnaire that was applied 4 times at the end of each academic year. According to the results of the forms evaluated at the end of each year, 4 additional laboratory activities were conducted addressing the deficient psychomotor skills of students at the beginning of the new academic semester in the 2nd and 3rd years. In the 4th-year clinic practice, courses were arranged to practice still deficient psychomotor skills. It was determined that students practiced nearly all of the basic psychomotor skills during clinical practice and that the practices with which they felt themselves to be inadequate gradually decreased following periodic training; this decrease was significant (ppsychomotor skills of nursing students was effective. We recommend that students' psychomotor skills be evaluated periodically and repetitive training based on the results of this evaluation be provided throughout the undergraduate nursing education process. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Experimental and numerical investigations of temporally and spatially periodic modulated wave trains

    Science.gov (United States)

    Houtani, H.; Waseda, T.; Tanizawa, K.

    2018-03-01

    A number of studies on steep nonlinear waves were conducted experimentally with the temporally periodic and spatially evolving (TPSE) wave trains and numerically with the spatially periodic and temporally evolving (SPTE) ones. The present study revealed that, in the vicinity of their maximum crest height, the wave profiles of TPSE and SPTE modulated wave trains resemble each other. From the investigation of the Akhmediev-breather solution of the nonlinear Schrödinger equation (NLSE), it is revealed that the dispersion relation deviated from the quadratic dependence of frequency on wavenumber and became linearly dependent instead. Accordingly, the wave profiles of TPSE and SPTE breathers agree. The range of this agreement is within the order of one wave group of the maximum crest height and persists during the long-term evolution. The findings extend well beyond the NLSE regime and can be applied to modulated wave trains that are highly nonlinear and broad-banded. This was demonstrated from the numerical wave tank simulations with a fully nonlinear potential flow solver based on the boundary element method, in combination with the nonlinear wave generation method based on the prior simulation with the higher-order spectral model. The numerical wave tank results were confirmed experimentally in a physical wave tank. The findings of this study unravel the fundamental nature of the nonlinear wave evolution. The deviation of the dispersion relation of the modulated wave trains occurs because of the nonlinear phase variation due to quasi-resonant interaction, and consequently, the wave geometry of temporally and spatially periodic modulated wave trains coincides.

  1. DLTAP: A Network-efficient Scheduling Method for Distributed Deep Learning Workload in Containerized Cluster Environment

    Directory of Open Access Journals (Sweden)

    Qiao Wei

    2017-01-01

    Full Text Available Deep neural networks (DNNs have recently yielded strong results on a range of applications. Training these DNNs using a cluster of commodity machines is a promising approach since training is time consuming and compute-intensive. Furthermore, putting DNN tasks into containers of clusters would enable broader and easier deployment of DNN-based algorithms. Toward this end, this paper addresses the problem of scheduling DNN tasks in the containerized cluster environment. Efficiently scheduling data-parallel computation jobs like DNN over containerized clusters is critical for job performance, system throughput, and resource utilization. It becomes even more challenging with the complex workloads. We propose a scheduling method called Deep Learning Task Allocation Priority (DLTAP which performs scheduling decisions in a distributed manner, and each of scheduling decisions takes aggregation degree of parameter sever task and worker task into account, in particularly, to reduce cross-node network transmission traffic and, correspondingly, decrease the DNN training time. We evaluate the DLTAP scheduling method using a state-of-the-art distributed DNN training framework on 3 benchmarks. The results show that the proposed method can averagely reduce 12% cross-node network traffic, and decrease the DNN training time even with the cluster of low-end servers.

  2. The effects of plyometric training followed by detraining and reduced training periods on explosive strength in adolescent male basketball players.

    Science.gov (United States)

    Santos, Eduardo J A M; Janeira, Manuel A A S

    2011-02-01

    The aims of this study were to determine the effects of (a) plyometric training on explosive strength indicators in adolescent male basketball players and (b) detraining and reduced training on previously achieved explosive strength gains. Two groups were formed: an experimental and a control group. The former was submitted to a 10-week in-season plyometric training program, twice weekly, along with regular basketball practice. Simultaneously, the control group participated in regular basketball practice only. At the end of this period, the experimental group was subdivided into 2 groups: a reduced training group and a detraining group. All participants were assessed on squat jump, countermovement jump, Abalakov test, depth jump, mechanical power, and medicine ball throw at the beginning and at the end of the 10-week in-season plyometric training and on weeks 4, 8, 12, and 16 of the in-season detraining and reduced training periods. In the first phase of the study, the experimental group significantly increased all the assessed indicators (p training showed positive effects on upper- and lower-body explosive strength in adolescent male basketball players. Moreover, we can state that both detraining and a reduced training program indistinctly contribute to maintenance of strength levels. These results highlight the unique power that basketball-specific training seems to have on the sustainability and maintenance of sport performance.

  3. Self-certification and employee training of mail-order distributors of scheduled listed chemical products. Interim final rule with request for comment.

    Science.gov (United States)

    2011-04-13

    On October 12, 2010, the President signed the Combat Methamphetamine Enhancement Act of 2010 (MEA). It establishes new requirements for mail-order distributors of scheduled listed chemical products. Mail-order distributors must now self-certify to DEA in order to sell scheduled listed chemical products at retail. Sales at retail are those sales intended for personal use; mail-order distributors that sell scheduled listed chemical products not intended for personal use, e.g., sale to a university, are not affected by the new law. This self-certification must include a statement that the mail-order distributor understands each of the requirements that apply under part 1314 and agrees to comply with these requirements. Additionally, mail-order distributors are now required to train their employees prior to self certification. DEA is promulgating this rule to incorporate the statutory provisions and make its regulations consistent with the new requirements and other existing regulations related to self-certification.

  4. Direct block scheduling technology: Analysis of Avidity

    Directory of Open Access Journals (Sweden)

    Felipe Ribeiro Souza

    Full Text Available Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.

  5. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled Course Sessions (October 2006-March 2007)

    CERN Multimedia

    2006-01-01

    The Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the Oracle, C++, OO and Java course series there are some places available on the following course sessions, currently scheduled until March 2007: Object-Oriented Analysis and Design using UML: 17-19 October 2006 (3 days) JAVA - Level 1: 30 October - 1 November 2006 (3 days) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16 November 2006 (3 days) Oracle Database Server Administration: 23-29 November 2007 (5 days) JAVA - Level 2: 4-7 December 2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15 December 2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 18-20 December 2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 15-16 January 2007 (2 days) C++ Programming Part 3 - Templates and the STL (St...

  6. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled Course Sessions (August-December 2006)

    CERN Multimedia

    2006-01-01

    The Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the PERL, C++, OO and Java course series there are some places available on the following course sessions, scheduled until the end of this year: PERL 5 - Introduction: 31.8-1.9.2006 (2 days) C++ for Particle Physicists: 16-20.10.2006 (6 half days, the popular course given by Paul Kunz) Object-Oriented Analysis and Design using UML: 17-19.10.2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 19-20.10.2006 (2 days) JAVA - Level 1: 30.10-1.11.2006 (3 days) PERL 5 - Advanced Aspects: 2.11.2006 (1 day) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16.11.2006 (3 days) JAVA - Level 2: 4-7.12.2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15.12.2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBea...

  7. Strong Relaxations for the Train Timetabling Problem Using Connected Configurations

    OpenAIRE

    Fischer, Frank; Schlechte, Thomas

    2017-01-01

    The task of the train timetabling problem or track allocation problem is to find conflict free schedules for a set of trains with predefined routes in a railway network. Especially for non-periodic instances models based on time expanded networks are often used. Unfortunately, the linear programming relaxation of these models is often extremely weak because these models do not describe combinatorial relations like overtaking possibilities very well. In this paper we extend the model by so cal...

  8. Comparison of Powerlifting Performance in Trained Men Using Traditional and Flexible Daily Undulating Periodization.

    Science.gov (United States)

    Colquhoun, Ryan J; Gai, Christopher M; Walters, Jeoffrey; Brannon, Andrew R; Kilpatrick, Marcus W; DʼAgostino, Dominic P; Campbell, Bill I

    2017-02-01

    Colquhoun, RJ, Gai, CM, Walters, J, Brannon, AR, Kilpatrick, MW, D'Agostino, DP, and Campbell, WI. Comparison of powerlifting performance in trained men using traditional and flexible daily undulating periodization. J Strength Cond Res 31(2): 283-291, 2017-Daily undulating periodization (DUP) is a growing trend, both in practice and in the scientific literature. A new form of DUP, flexible daily undulating periodization (FDUP), allows for athletes to have some autonomy by choosing the order of their training. The purpose of this study was to compare an FDUP model to a traditional model of DUP on powerlifting performance in resistance-trained men. Twenty-five resistance-trained men were randomly assigned to one of 2 groups: FDUP (N = 14) or DUP (N = 11). All participants possessed a minimum of 6 months of resistance training experience and were required to squat, bench press, and deadlift 125, 100, and 150% of their body mass, respectively. Dependent variables assessed at baseline and after the 9-week training program included bench press 1 repetition maximum (1RM), squat 1RM, deadlift 1RM, powerlifting total, Wilks Coefficient, fat mass, and fat-free mass (FFM). Dependent variables assessed during each individual training session were motivation to train, Session Rating of Perceived Exertion (Session RPE), and satisfaction with training session. After the 9-week training program, no significant differences in intensity or volume were found between groups. Both groups significantly improved bench press 1RM (FDUP: +6.5 kg; DUP: +8.8 kg), squat 1RM (FDUP: +15.6 kg; DUP: +18.0 kg), deadlift 1RM (FDUP: +14.8 kg; DUP: +13.6 kg), powerlifting total (FDUP: +36.8 kg; DUP: +40.4 kg), and Wilks Coefficient (FDUP: +24.8; DUP: +26.0) over the course of study (p = <0.001 for each variable). There was also a significant increase in FFM (FDUP: +0.8 kg; DUP: +0.8 kg) for both groups (p = 0.003). There were no differences in motivation to train, session RPE, or satisfaction with

  9. Solving cyclical nurse scheduling problem using preemptive goal programming

    Science.gov (United States)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  10. The Preparation Period in Basketball: Training Load and Neuromuscular Adaptations.

    Science.gov (United States)

    Ferioli, Davide; Bosio, Andrea; Bilsborough, Johann C; Torre, Antonio La; Tornaghi, Michele; Rampinini, Ermanno

    2018-01-18

    To investigate the 1) effect of the preparation period on the neuromuscular characteristics of 12 professional (PRO) and 16 semi-professional (SEMI-PRO) basketball players; 2) relationships between training load indices and changes in neuromuscular physical performance. Prior to and following the preparation period, players underwent a counter-movement jump (CMJ) test, followed by a repeated change of direction (COD) test consisting of 4 levels with increasing intensities. The peripheral neuromuscular functions of the knee extensors (peak torque, PT) were measured using electrical stimulations after each level (PT1, PT2, PT3 and PT4). Furthermore, PT Max (the highest value of PT) and PT Dec (PT decrement from PT Max to PT4) were calculated. Trivial-to-small (effect size, ES: -0.17 to 0.46) improvements were found in CMJ variables, regardless of the competitive levels. After the preparation period, peripheral fatigue induced by a COD test was similarly reduced in both PRO (PT Dec: from 27.8±21.3% to 11.4±13.7%, ES±90%CI= -0.71±0.30) and SEMI-PRO (PT Dec: from 26.1±21.9% to 10.2±8.2%, ES±90%CI= -0.69±0.32). Moderate-to-large relationships were found between session rating of perceived exertion training load and changes in PPO measured during the CMJs (r s ±90%CI: PPOabs, -0.46±0.26; PPOrel, -0.53±0.23) and in some PTs measured during the COD test (PT1, -0.45±0.26; PT2, -0.44±0.26; PT3, -0.40±0.27 and PT Max, -0.38±0.28). Preparation period induced minimal changes in the CMJ, while the ability to sustain repeated COD efforts was improved. Reaching high session rating of perceived exertion training loads might partially and negatively affect the ability to produce strength and power.

  11. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  12. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  13. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  14. Influence of the freight transnational rail liner service on the train scheduling in case of major corridors

    Directory of Open Access Journals (Sweden)

    Mihaela POPA

    2013-01-01

    Full Text Available In this paper we discuss several consequences of the freight transnational rail liner service on the rail corridor capacity. The Northern part of the IVth TEN-T corridor on Romanian territory has specific feature related to the passenger flows connecting important Romanian demographic and economic clusters, on one side, and on the other side, to its diagonal crossing aspect, from the Western border to the Constanta port, connecting the Central Europe countries to the Black Sea regions, which means that there are a lot of expectation in terms of this corridor rail capacity: this corridor will, be for a long time further, the single and first completed continuous upgraded and modernised rail corridor. Its utilization will necessarily be heterogeneously planned (meaning for passengers rapid trains and freight rapid trains, from domestic/internal market, but especially for external market of Romania. In this paper, we consider a simple mathematical model for the calculus of capacity in two different cases: for a homogeneous utilization, meaning that all trains have the same running speeds and for heterogeneous utilization, when the passenger trains have the higher speed and hence, the higher priority over the freight trains, even if some of them are freight transnational liner service. Special feature of liner rail service has to be considered (fixed schedule, no stops for passenger train advance. We draw several useful possible solutions to be considered in order to preserve the active corridor capacity, and to assure a smooth flow for the transnational liner services, which ultimately will enhance the rail attractiveness.

  15. Solving Large Scale Crew Scheduling Problems in Practice

    NARCIS (Netherlands)

    E.J.W. Abbink (Erwin); L. Albino; T.A.B. Dollevoet (Twan); D. Huisman (Dennis); J. Roussado; R.L. Saldanha

    2010-01-01

    textabstractThis paper deals with large-scale crew scheduling problems arising at the Dutch railway operator, Netherlands Railways (NS). NS operates about 30,000 trains a week. All these trains need a driver and a certain number of guards. Some labor rules restrict the duties of a certain crew base

  16. Multimodal processes scheduling in mesh-like network environment

    Directory of Open Access Journals (Sweden)

    Bocewicz Grzegorz

    2015-06-01

    Full Text Available Multimodal processes planning and scheduling play a pivotal role in many different domains including city networks, multimodal transportation systems, computer and telecommunication networks and so on. Multimodal process can be seen as a process partially processed by locally executed cyclic processes. In that context the concept of a Mesh-like Multimodal Transportation Network (MMTN in which several isomorphic subnetworks interact each other via distinguished subsets of common shared intermodal transport interchange facilities (such as a railway station, bus station or bus/tram stop as to provide a variety of demand-responsive passenger transportation services is examined. Consider a mesh-like layout of a passengers transport network equipped with different lines including buses, trams, metro, trains etc. where passenger flows are treated as multimodal processes. The goal is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multimodal transportation processes scheduling encompassing passenger flow itineraries. Then, the main objective is to provide conditions guaranteeing solvability of particular transport lines scheduling, i.e. guaranteeing the right match-up of local cyclic acting bus, tram, metro and train schedules to a given passengers flow itineraries.

  17. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPP's. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under the direct supervision of the trainer within 4 to 10 weeks after the successful completion of both written and oral of examinations. Last year the committee held ten sessions for the oral theoretical examination. The number of licenses issued in 2001 and the total number of valid licenses is given. Conclusions from inspections and tests as well as results from operation and start up of nuclear units confirm that in this area a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for UJD staff for 2001. This training composed of specialised qualification study, functional study, as well as study aimed at maintaining qualification (continual and periodical exercise). Training courses organised by the Government Office of Slovakia and the IAEA were also of a significant benefit and UJD staff participated on foreign training courses, seminars and conferences, focusing on maintaining and improvement of professional skills

  18. Using the principles of circadian physiology enhances shift schedule design

    International Nuclear Information System (INIS)

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance and alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced

  19. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  20. The Synthesis of a Hardware Scheduler for Non-Manifest Loops

    NARCIS (Netherlands)

    Mansour, O.; Molenkamp, Egbert; Krol, Th.

    This paper addresses the hardware implementation of a dynamic scheduler for non-manifest data dependent periodic loops. Static scheduling techniques which are known to give near optimal scheduling-solutions for manifest loops, fail at scheduling non-manifest loops, since they lack the run time

  1. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  2. HIT maintains performance during the transition period and improves next season performance in well-trained cyclists.

    Science.gov (United States)

    Rønnestad, Bent R; Askestad, Arild; Hansen, Joar

    2014-09-01

    To investigate the effects of combining low-intensity endurance training (LIT) with one high-intensity endurance training (HIT) session every 7-10 days (EXP, n = 7) vs. traditional approach focusing on LIT (TRAD, n = 6) during the transition period. The effects of different training strategies during the transition period were investigated after the transition period and at the beginning of the subsequent competition season. Well-trained cyclists were tested after the competition season, after an 8-week transition period, and after a 16-week preparatory period, before the subsequent competition season. The only difference between groups was a larger time with HIT during the transition phase in EXP. It was very likely that EXP had a larger impact on power output at 4 mmol L(-1) [la(-)] after both the transition period and after the preparatory period than TRAD [between-group change (90% CI): 10.6% (8.2%) and 12.9% (11.9%), respectively]. It was very likely that EXP had a larger impact on mean power output in the 40-min all-out trial after the transition period than TRAD [between-group change 12.4% (7.6%)]. EXP was also likely to have a larger improvement in the 40-min trial performance from pre-test to after the preparatory period than TRAD [between-group change 6.0% (6.6%)]. The present findings suggest that HIT sessions should be incorporated during the transition phase to avoid reduction in fitness and performance level and thereby increase the likelihood of improved performance from the end of one season to the beginning of the subsequent season.

  3. Field training

    International Nuclear Information System (INIS)

    Mumford, G.E.; Hadaway, E.H.

    1991-01-01

    Individualized, personal training can be used to increase an employee's awareness of the HSE program. Such training can stimulate personal commitment and provide personal skills that can be utilized for the benefit of the overall HSE effort. But, providing such training within our industry can be a difficult task due to the scheduling, travel arrangements, and cost associated with bringing employees from isolated, remote locations to centrally located training facilities. One method of overcoming these obstacles involves the use of field instructors to provide the training at the many, and varied number of individuals can be reached with minimal disruption to their work scheduling or to their time off. In fact, this type of on-site training is already used by some oil companies and drilling contractors with encouraging results. This paper describes one drilling contractor's experiences with such a training program. The results after eight years how that this program not only can provide and efficient, economical means of employee training, but also can have a direct application to employee motivation regarding a company's HSE effort

  4. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  5. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  6. [Impact of the Core Training Law on preventive medicine and public health training and other common medical specialties].

    Science.gov (United States)

    Latasa, Pello; Gil-Borrelli, Christian; Aguilera, José Antonio; Reques, Laura; Barreales, Saúl; Ojeda, Elena; Alemán, Guadalupe; Iniesta, Carlos; Gullón, Pedro

    2016-01-01

    The purpose of the Core Training Law (CTL) is to amend specialised medical training to include 24 months of common training. The aim of this study is to assess its potential impact on the Preventive Medicine and Public Health (PM&PH) training programme and other medical specialties. The programmes of the 21 common medical specialties were analysed and the recommended training periods for each specialty collected, before the information was agreed upon by three observers. The training impact was calculated as the percentage of months that should be amended per specialty to adapt to the common training schedule. The Preventive Medicine and Public Health training programme is the specialty most affected by the Core Training Law (100%, 24 months). Intensive medicine (0%, 0 months) and medical oncology (17%, 4 months) is the least affected. The CTL affects the common medical specialties in different ways and requires a complete reorganisation of the activities and competencies of PM&PH professionals. Copyright © 2016 SESPAS. Published by Elsevier Espana. All rights reserved.

  7. Training and qualification of inspectors

    International Nuclear Information System (INIS)

    Aro, I.; Anderson, R.; Ericsson, P.O.; Lee, I.

    1993-01-01

    A total of four workshop breakout sessions were conducted on this subject: one double session and three single sessions. The following discussion describes common points and difference among the countries in the areas of inspector training and qualifications. In most countries there are resident or non-resident site-specific inspectors who have general plant supervision duties. In addition, there are specialized inspectors who visit NPP when requested or according to the scheduled inspection program. Most countries try to recruit experienced personnel. Many countries prefer to have candidates who have extensive plant experience. Some countries do not recruit inspectors from utilities because of potential conflict of interest or credibility reasons. In many countries, the typical training time to become an independent inspector is one year. In some countries an inspector is formally certified after their training period and completion of an examination

  8. Erratum to ''Johnson's algorithm : A key to solve optimally or approximately flowshop scheduling problems with unavailability periods'' [International Journal of Production Economics 121 (2009) 81-87

    OpenAIRE

    Rapine , Christophe

    2013-01-01

    International audience; In Allaoui H., Artiba A, ''Johnson's algorithm : A key to solve optimally or approximately flowshop scheduling problems with unavailability periods'' [International Journal of Production Economics 121 (2009)] the authors propose optimality conditions for the Johnson sequence in presence of one unavailability period on the first machine and pretend for a performance guarantee of 2 when several unavailability periods may occur. We establish in this note that these condit...

  9. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  10. The influence of training on the attentional blink and psychological refractory period.

    Science.gov (United States)

    Garner, K G; Tombu, M N; Dux, P E

    2014-05-01

    A growing body of research suggests that dual-task interference in sensory consolidation (e.g., the attentional blink, AB) and response selection (e.g., the psychological refractory period, PRP) stems from a common central bottleneck of information processing. With regard to response selection, it is well known that training reduces dual-task interference. We tested whether training that is known to be effective for response selection can also reduce dual-task interference in sensory consolidation. Over two experiments, performance on a PRP paradigm (Exp. 1) and on AB paradigms (differing in their stimuli and task demands, Exps. 1 and 2) was examined after participants had completed a relevant training regimen (T1 practice for both paradigms), an irrelevant training regimen (comparable sensorimotor training, not related to T1 for both tasks), a visual-search training regimen (Exp. 2 only), or after participants had been allocated to a no-training control group. Training that had shown to be effective for reducing dual-task interference in response selection was also found to be effective for reducing interference in sensory consolidation. In addition, we found some evidence that training benefits transferred to the sensory consolidation of untrained stimuli. Collectively, these findings show that training benefits can transfer across cognitive operations that draw on the central bottleneck in information processing. These findings have implications for theories of the AB and for the design of cognitive-training regimens that aim to produce transferable training benefits.

  11. Training community mental health staff in Guangzhou, China: evaluation of the effect of a new training model.

    Science.gov (United States)

    Li, Jie; Li, Juan; Thornicroft, Graham; Yang, Hui; Chen, Wen; Huang, Yuanguang

    2015-10-26

    Increasing numbers of people with mental disorders receive services at primary care in China. The aims of this study are to evaluate impact of a new training course and supervision for community mental health staff to enhance their levels of mental health knowledge and to reduce their stigmatization toward people with mental illness. A total of 77 community mental health staff from eight regions in Guangzhou in China were recruited for the study.4 regions were randomly allocated to the new training model group, and 4 to the old training model group. Levels of mental health knowledge were measured by purpose-made assessment schedule and by the Mental Health Knowledge Schedule (MAKS). Stigma was evaluated by the Mental Illness: Clinicians' Attitudes Scale (MICA) and the Reported and Intended Behavior Scale (RIBS). Evaluation questionnaires were given at the beginning of course, at the end, and at 6 month and at 12 month follow-up. After the training period, the 6-month, and the 12-month, knowledge scores of the intervention group were higher than the control group. At 6-month and 12-month follow-up, means scores of MAKS of the intervention group increased more than the control group (both p training, at 6-months, and at 12-months, mean scores of RIBS of the intervention group increased more than the control (p training course and supervision, the new course improved community mental health staff knowledge of mental disorders, improving their attitudes toward people with mental disorder, and increasing their willingness to have contact with people with mental disorder.

  12. Effects of Two Different Training Periodization Models on Physical and Physiological Aspects of Elite Female Team Handball Players.

    Science.gov (United States)

    Manchado, Carmen; Cortell-Tormo, Juan M; Tortosa-Martínez, Juan

    2018-01-01

    Manchado, C, Cortell-Tormo, JM, and Tortosa-Martínez, J. Effects of two different training periodization models on physical and physiological aspects of elite female team handball players. J Strength Cond Res 32(1): 280-287, 2018-The aim of this study was to compare training-induced changes in selected physiological and physical team handball performance factors after 2 training periodization models: traditional periodization (TP) vs. block periodization (BP). Eleven female team handball players who played over 2 consecutive seasons for a Spanish first league team were assessed twice per season during a training cycle. On each occasion, participants completed anthropometric, maximal strength, and lower-body power assessments. In addition, incremental tests to determine maximum oxygen uptake (V[Combining Dot Above]O2max), sprint- and sport-specific throwing velocity tests were performed. Block periodization group experienced significantly greater improvements than TP on squat jump (5.97%; p handball performance factors in high level female handball players.

  13. 49 CFR 1220.6 - Schedule of records and periods of retention.

    Science.gov (United States)

    2010-10-01

    ... listed below shall be retained as determined by the management of each company. Schedule of Records and..., Stockholders and other corporate meetings Do. 3. Titles, franchises and authorities: (a) Certificates of public... agreements: (a) Service contracts, such as for operational management, accounting, financial or legal...

  14. Effects of combined linear and nonlinear periodic training on physical fitness and competition times in finswimmers.

    Science.gov (United States)

    Yu, Kyung-Hun; Suk, Min-Hwa; Kang, Shin-Woo; Shin, Yun-A

    2014-10-01

    The purpose of this study was to investigate the effect of combined linear and nonlinear periodic training on physical fitness and competition times in finswimmers. The linear resistance training model (6 days/week) and nonlinear underwater training (4 days/week) were applied to 12 finswimmers (age, 16.08± 1.44 yr; career, 3.78± 1.90 yr) for 12 weeks. Body composition measures included weight, body mass index (BMI), percent fat, and fat-free mass. Physical fitness measures included trunk flexion forward, trunk extension backward, sargent jump, 1-repetition-maximum (1 RM) squat, 1 RM dead lift, knee extension, knee flexion, trunk extension, trunk flexion, and competition times. Body composition and physical fitness were improved after the 12-week periodic training program. Weight, BMI, and percent fat were significantly decreased, and trunk flexion forward, trunk extension backward, sargent jump, 1 RM squat, 1 RM dead lift, and knee extension (right) were significantly increased. The 50- and 100-m times significantly decreased in all 12 athletes. After 12 weeks of training, all finswimmers who participated in this study improved their times in a public competition. These data indicate that combined linear and nonlinear periodic training enhanced the physical fitness and competition times in finswimmers.

  15. On the question of periodization training content and Paralympic athletes with disorders of the musculoskeletal system in the light of the general theory of sports training

    Directory of Open Access Journals (Sweden)

    V.N. Derkach

    2014-05-01

    Full Text Available Purpose : To determine theoretically similar trends and differences in the periods of sports training athletes and Paralympic athletes with similar qualifications, without disabilities. Material : analyzed more than 80 references. Results : at present insufficiently developed periodization sports training many years to prepare athletes with disorders of the musculoskeletal system. Also - at the stage of maximum realization of individual empowerment athletes. This applies to the immediate preparation for the main competition. In the first case, periodization can be carried out on the basis of the classical theory. Also on stage, maximizing the individual capabilities. Need to adapt this theory to career achievements of athletes. Also, you must consider the disease. Conclusions : The main factors set differences training tools Paralympic athletes and physically healthy: increased attention to the psychological preparation for the Paralympics, inclusive education and sports training individualization programs already in the first stage of their training.

  16. Operations Research for Freight Train Routing and Scheduling

    DEFF Research Database (Denmark)

    Harrod, Steven; Gorman, Michael F.

    2011-01-01

    This article describes the service design activities that plan and implement the rail freight operating plan. Elements of strategic service design include the setting of train frequency, the routing of cars among trains, and the consolidation of cars, called blocking. At the operational level......, trains are dispatched either according to train paths configured in advance, called timetables, or according to priority rules. We describe the North American and European practice along with selected modeling and problem solving methodologies appropriate for each of the operating conditions described...

  17. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  18. Treadmill training with partial body weight support compared with conventional gait training for low-functioning children and adolescents with nonspastic cerebral palsy: a two-period crossover study.

    Science.gov (United States)

    Su, Ivan Y W; Chung, Kenny K Y; Chow, Daniel H K

    2013-12-01

    Partial body weight-supported treadmill training has been shown to be effective in gait training for patients with neurological disorders such as spinal cord injuries and stroke. Recent applications on children with cerebral palsy were reported, mostly on spastic cerebral palsy with single subject design. There is lack of evidence on the effectiveness of such training for nonspastic cerebral palsy, particularly those who are low functioning with limited intellectual capacity. This study evaluated the effectiveness of partial body weight-supported treadmill training for improving gross motor skills among these clients. A two-period randomized crossover design with repeated measures. A crossover design following an A-B versus a B-A pattern was adopted. The two training periods consisted of 12-week partial body weight-supported treadmill training (Training A) and 12-week conventional gait training (Training B) with a 10-week washout in between. Ten school-age participants with nonspastic cerebral palsy and severe mental retardation were recruited. The Gross Motor Function Measure-66 was administered immediately before and after each training period. Significant improvements in dimensions D and E of the Gross Motor Function Measure-66 and the Gross Motor Ability Estimator were obtained. Our findings revealed that the partial body weight-supported treadmill training was effective in improving gross motor skills for low-functioning children and adolescents with nonspastic cerebral palsy. .

  19. Management Training in Retailing.

    Science.gov (United States)

    Veness, C. Rosina

    Intended for prospective members of the new Distributive Industrial Training Board in Great Britain, this training guide concentrates on managerial functions in retailing; the selection of trainees; the planning of in-company and external training programs; scheduling and continuity of training; roles of training personnel; and the use of various…

  20. The Effectiveness of Life Skills Training on Enhancement of Self-Esteem and Marital Satisfaction among Addicts in Treatment Period

    Directory of Open Access Journals (Sweden)

    R Nooripour

    2014-11-01

    Full Text Available Objective: This study has been done to determine the impact of life skills training on enhancement of self-esteem and marital satisfaction among addicts in treatment period. Method: The research design was semi experimental pretest-posttest with witness group. For each group 12men addicts in treatment period in Qazvin city were selected by available sampling. Rosenberg self-esteem and Enrich marital satisfaction questionnaires were administered among selected samples. Training workshop was conducted on role playing, questioning and answering which was taught by psychology professors in experimental group. Results: Results showed life skills training improved self-esteem and marital satisfaction of addicts in treatment period. Conclusion: Life skills training have a positive impact on self-esteem and marital satisfaction of individuals especially on addicts in treatment period, also life skills training in the field of smoking prevention enhances individuals’ skills (such as self-esteem, marital satisfaction, etc…. Life skills training empower person to actualize his knowledge, attitudes and values, and enable him to have motivation for healthy behavior which this will have significant impact on his relationship with his wife.

  1. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  2. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  3. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  4. Criteria and procedures for validating biomathematical models of human performance and fatigue : procedures for analysis of work schedules.

    Science.gov (United States)

    2013-01-01

    Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...

  5. Real-time Energy Resource Scheduling considering a Real Portuguese Scenario

    DEFF Research Database (Denmark)

    Silva, Marco; Sousa, Tiago; Morais, Hugo

    2014-01-01

    The development in power systems and the introduction of decentralized gen eration and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which...... scheduling in smart grids, considering day - ahead, hour - ahead and real - time scheduling. The case study considers a 33 - bus distribution network with high penetration of distributed energy resources . The wind generation profile is base d o n a rea l Portuguese wind farm . Four scenarios are presented...... taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour - ahead and real - time scheduling...

  6. Gain and exposure scheduling to compensate for photorefractive neural-network weight decay

    Science.gov (United States)

    Goldstein, Adam A.; Petrisor, Gregory C.; Jenkins, B. Keith

    1995-03-01

    A gain and exposure schedule that theoretically eliminates the effect of photorefractive weight decay for the general class of outer-product neural-network learning algorithms (e.g., backpropagation, Widrow-Hoff, perceptron) is presented. This schedule compensates for photorefractive diffraction-efficiency decay by iteratively increasing the spatial-light-modulator transfer function gain and decreasing the weight-update exposure time. Simulation results for the scheduling procedure, as applied to backpropagation learning for the exclusive-OR problem, show improved learning performance compared with results for networks trained without scheduling.

  7. Scheduling freight trains in rail-rail transshipment yards

    OpenAIRE

    Nils Boysen; Erwin Pesch

    2008-01-01

    Transshipment yards, where gantry cranes allow for an effcient transshipment of containers between different freight trains, are important entities in modern railway systems and facilitate the general shift from point-to-point transport to hub-and-spoke railway systems. Modern rail-rail transshipment yards accelerate container handling, so that multiple smaller trains with equal destination can be consolidated to a reduced number of trains without jeopardizing on time deliveries. An important...

  8. The relationship between the age of onset of musical training and rhythm synchronization performance: validation of sensitive period effects.

    Science.gov (United States)

    Bailey, Jennifer A; Penhune, Virginia B

    2013-01-01

    A sensitive period associated with musical training has been proposed, suggesting the influence of musical training on the brain and behavior is strongest during the early years of childhood. Experiments from our laboratory have directly tested the sensitive period hypothesis for musical training by comparing musicians who began their training prior to age seven with those who began their training after age seven, while matching the two groups in terms of musical experience (Watanabe et al., 2007; Bailey and Penhune, 2010, 2012). Using this matching paradigm, the early-trained groups have demonstrated enhanced sensorimotor synchronization skills and associated differences in brain structure (Bailey et al., 2013; Steele et al., 2013). The current study takes a different approach to investigating the sensitive period hypothesis for musical training by examining a single large group of unmatched musicians (N = 77) and exploring the relationship between age of onset of musical training as a continuous variable and performance on the Rhythm Synchronization Task (RST), a previously used auditory-motor RST. Interestingly, age of onset was correlated with task performance for those who began training earlier, however, no such relationship was observed among those who began training in their later childhood years. In addition, years of formal training showed a similar pattern. However, individual working memory scores were predictive of task performance, regardless of age of onset of musical training. Overall, these results support the sensitive period hypothesis for musical training and suggest a non-linear relationship between age of onset of musical training and auditory-motor rhythm synchronization abilities, such that a relationship exists early in childhood but then plateaus later on in development, similar to maturational growth trajectories of brain regions implicated in playing music.

  9. The relationship between the age of onset of musical training and rhythm synchronization performance: Validation of sensitive period effects

    Directory of Open Access Journals (Sweden)

    Jennifer Anne Bailey

    2013-11-01

    Full Text Available A sensitive period associated with musical training has been proposed, suggesting the influence of musical training on the brain and behaviour is strongest during the early childhood years. Experiments from our laboratory have directly tested the sensitive period hypothesis for musical training by comparing musicians who began their training before age seven with those who began their training after age seven, while matching the two groups in terms of musical experience (Bailey & Penhune, 2010; 2012; Watanabe, Savion-Lemieux, & Penhune, 2007. Using this matching paradigm, the early-trained groups have demonstrated enhanced sensorimotor synchronization skills and associated differences in brain structure (Bailey, Zatorre, & Penhune, under review; Steele, Bailey, Zatorre, & Penhune, 2013. The current study takes a different approach to investigating the sensitive period hypothesis for musical training by examining a single large group of unmatched musicians (N=77 and exploring the relationship between age of onset of musical training as a continuous variable and performance on the Rhythm Synchronization Task (RST, a previously used auditory-motor rhythm synchronization task. Interestingly, age of onset was correlated with task performance for those who began training earlier; however, no such relationship was observed among those who began training in their later childhood years. In addition, years of formal training showed a similar pattern. However, individual working memory scores were predictive of task performance, regardless of age of onset of musical training. Overall, these results support the sensitive period hypothesis for musical training and suggest a non-linear relationship between age of onset of musical training and auditory-motor rhythm synchronization abilities, such that a relationship exists early in childhood but then plateaus later on in development, similar to maturational growth trajectories of brain regions implicated in

  10. Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

    Directory of Open Access Journals (Sweden)

    Chun-Cheng Lin

    2014-01-01

    Full Text Available When it comes to nurse shift schedules, it is found that the nursing staff have diverse preferences about shift rotations and days-off. The previous studies only focused on the most preferred work shift and the number of satisfactory days-off of the schedule at the current schedule period but had few discussions on the previous schedule periods and other preference levels for shifts and days-off, which may affect fairness of shift schedules. As a result, this paper proposes a nurse scheduling model based upon integer programming that takes into account constraints of the schedule, different preference ranks towards each shift, and the historical data of previous schedule periods to maximize the satisfaction of all the nursing staff's preferences about the shift schedule. The main contribution of the proposed model is that we consider that the nursing staff’s satisfaction level is affected by multiple preference ranks and their priority ordering to be scheduled, so that the quality of the generated shift schedule is more reasonable. Numerical results show that the planned shifts and days-off are fair and successfully meet the preferences of all the nursing staff.

  11. Effects of Added Resistance Training on Physical Fitness, Body Composition, and Serum Hormone Concentrations During Eight Weeks of Special Military Training Period.

    Science.gov (United States)

    Vaara, Jani P; Kokko, Juha; Isoranta, Manne; Kyröläinen, Heikki

    2015-11-01

    A high volume of military training has been shown to compromise muscle strength development. We examined effects of added low-volume resistance training during special military training (ST) period, which took place after basic training period. Male conscripts (n = 25) were assigned to standardized ST with added resistance training group (TG, n = 13) and group with standardized ST only (control) (CG, n = 12). Standardized ST with added resistance training group performed 2 resistance training sessions per week for 8 weeks: hypertrophic strength (weeks 1-3), maximal strength (weeks 4-6) and power training (weeks 7-8). Maximal strength tests, load carriage performance (3.2 km, 27 kg), and hormone concentrations were measured before and after ST (mean ± SD). Both groups improved similarly in their load carriage performance time (TG: 1,162 ± 116 seconds vs. 1,047 ± 81 seconds; CG: 1,142 ± 95 seconds vs. 1,035 ± 81 seconds) (p < 0.001) but decreased maximal strength of the lower extremities (TG: 5,250 ± 1,110 N vs. 4,290 ± 720 N; CG: 5,170 ± 1,050 N vs. 4,330 ± 1,230 N) and back muscles (TG: 4,290 ± 990 N vs. 3,570 ± 48 N; CG: 3,920 ± 72 N vs. 3,410 ± 53 N) (p ≤ 0.05). Maximal strength of the upper extremities improved in CG (1,040 ± 200 N vs. 1,140 ± 200 N) (p ≤ 0.05) but not in TG. Maximal strength of the abdominal muscles improved in TG (3,260 ± 510 N vs. 3,740 ± 75 N) (p ≤ 0.05) but not in CG. Testosterone concentration increased in CG (15.2 ± 3.6 nmol·L⁻¹ vs. 21.6 ± 5.0 nmol·L⁻¹) (p < 0.01) but not in TG (18.6 ± 4.3 nmol·L⁻¹ vs. 19.5 ± 9.4 nmol·L⁻¹). In conclusion, interference with strength gains might be related to the high volume of aerobic activities and too low volume of resistance training during ST. To develop strength characteristics, careful periodization and individualization should be adopted in ST.

  12. A Comparison of Escalating versus Fixed Reinforcement Schedules on Undergraduate Quiz Taking

    Science.gov (United States)

    Mahoney, Amanda

    2017-01-01

    Drug abstinence studies indicate that escalating reinforcement schedules maintain abstinence for longer periods than fixed reinforcement schedules. The current study evaluated whether escalating reinforcement schedules would maintain more quiz taking than fixed reinforcement schedules. During baseline and for the control group, bonus points were…

  13. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  14. Speed Synchronization Control of Integrated Motor–Transmission Powertrain over CAN through Active Period-Scheduling Approach

    Directory of Open Access Journals (Sweden)

    Wanke Cao

    2017-11-01

    Full Text Available This paper deals with the speed synchronization control of integrated motor–transmission (IMT powertrain systems in pure electric vehicles (EVs over a controller area network (CAN subject to both network-induced delays and network congestion. A CAN has advantages over point-to-point communication; however, it imposes network-induced delays and network congestion into the control system, which can deteriorate the shifting quality and make system integration difficult. This paper presents a co-design scheme combining active period scheduling and discrete-time slip mode control (SMC to deal with both network-induced delays and network congestion of the CAN, which improves the speed synchronization control for high shifting quality and prevents network congestion for the system’s integration. The results of simulations and hardware-in-loop experiments show the effectiveness of the proposed scheme, which can ensure satisfactory speed synchronization performance while significantly reducing the network’s utilization.

  15. Improving the training process of highly skilled bodybuilders in the preparatory period, general preparatory phase

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskyy

    2015-10-01

    Full Text Available Purpose: to improve the method of training highly skilled bodybuilders. Material and Methods: the study involved eight highly skilled athletes, members of the team of Ukraine on bodybuilding. Results: comparative characteristics of the most commonly used methods of training process in bodybuilding. Developed and substantiated the optimal method of training highly skilled bodybuilders during the general preparatory phase of the preparatory period, which can increase body weight through muscle athletes component. Conclusions: dynamic load factor to raise the intensity of training loads allows orientation help to increase volumes shoulder muscles

  16. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  17. Improving the training process of skilled bodybuilders in specially-preparatory phase of the preparatory period

    Directory of Open Access Journals (Sweden)

    Viktor Dzhym

    2014-12-01

    Full Text Available Purpose: to study methods of improving the training process of skilled bodybuilders in a specially-preparatory phase of the preparatory period. Materials and Methods: the study involved 18 skilled bodybuilders are included in the team of the Kharkiv region of bodybuilding. Results: a comparative characteristic of the most commonly used methods of training process in bodybuilding. Developed and justified the optimal technique for skilled bodybuilders, depending on the initial form of the athlete at the beginning of a specially-preparatory phase of training. Shows the dependence of changes in body weight bodybuilder from the training process. Conclusions: on the basis of the research the author proposes an optimal method of training depending on the training microcycle in the run specially-preparatory stage.

  18. Computation and evaluation of scheduled waiting time for railway networks

    DEFF Research Database (Denmark)

    Landex, Alex

    2010-01-01

    Timetables are affected by scheduled waiting time (SWT) that prolongs the travel times for trains and thereby passengers. SWT occurs when a train hinders another train to run with the wanted speed. The SWT affects both the trains and the passengers in the trains. The passengers may be further...... affected due to longer transfer times to other trains. SWT can be estimated analytically for a given timetable or by simulation of timetables and/or plans of operation. The simulation of SWT has the benefit that it is possible to examine the entire network. This makes it possible to improve the future...

  19. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  20. Improving the training process of highly skilled bodybuilders in the preparatory period, general preparatory phase

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskyy

    2015-08-01

    Full Text Available Purpose: to improve the method of training highly skilled bodybuilders during the general preparatory phase. Material and Methods: the study involved eight highly skilled athletes, members of the team of Ukraine on bodybuilding. Results: comparative characteristics of the most commonly used methods of training process in bodybuilding. Developed and substantiated the optimal method of training highly skilled bodybuilders during the general preparatory phase of the preparatory period, which can increase body weight through muscle athletes component. Conclusions: based on studies, recommended the optimum method of training highly skilled bodybuilders depending on mezotsykles and microcycles general preparatory phase

  1. Hierarchical Scheduling Framework Based on Compositional Analysis Using Uppaal

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    This paper introduces a reconfigurable compositional scheduling framework, in which the hierarchical structure, the scheduling policies, the concrete task behavior and the shared resources can all be reconfigured. The behavior of each periodic preemptive task is given as a list of timed actions, ...

  2. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  3. Effect of tapering after a period of high-volume sprint interval training on running performance and muscular adaptations in moderately trained runners

    DEFF Research Database (Denmark)

    Skovgaard, Casper; Almquist, Nicki Winfield; Kvorning, Thue

    2018-01-01

    The effect of tapering following a period of high-volume sprint interval training (SIT) and a basic volume of aerobic training on performance and muscle adaptations in moderately trained runners was examined. Eleven (8 males, 3 females) runners (maximum oxygen uptake (VO2-max): 56.8±2.9 mL·min(-1...... running test at 90% of vVO2-max to exhaustion (RRT). In addition, a biopsy from m. vastus lateralis was obtained at rest. Performance during RRT was better (P... at 60% of vVO2-max was lower (P

  4. DLTAP: A Network-efficient Scheduling Method for Distributed Deep Learning Workload in Containerized Cluster Environment

    OpenAIRE

    Qiao Wei; Li Ying; Wu Zhong-Hai

    2017-01-01

    Deep neural networks (DNNs) have recently yielded strong results on a range of applications. Training these DNNs using a cluster of commodity machines is a promising approach since training is time consuming and compute-intensive. Furthermore, putting DNN tasks into containers of clusters would enable broader and easier deployment of DNN-based algorithms. Toward this end, this paper addresses the problem of scheduling DNN tasks in the containerized cluster environment. Efficiently scheduling ...

  5. Successful Implementation of Six Sigma to Schedule Student Staffing for Circulation Service Desks

    Science.gov (United States)

    Jankowski, Janiece

    2013-01-01

    In fall of 2011 the University at Buffalo Libraries circulation department undertook Six Sigma training for the purpose of overhauling its student scheduling process. The department was able to mitigate significant staffing budgetary reductions and resource reallocations and to overcome the unique challenges of scheduling student labor for a…

  6. Optimizing Training Event Schedules at Naval Air Station Fallon

    Science.gov (United States)

    2018-03-01

    Time VBA Visual Basic for Applications WTI Weapons and Tactics Instructor xiii THIS PAGE INTENTIONALLY LEFT BLANK xiv Executive Summary Naval Air...emitter inventory for each site. Constraint (3.6) ensures scheduled flight events have access to an emitter, at the proper location, required for the...flight event requests and their respective requirements into a specificmacro-enabled excel worksheet (Microsoftl, 2017). A series of VBA ( VBA , 2017

  7. Robust Aircraft Squadron Scheduling in the Face of Absenteeism

    National Research Council Canada - National Science Library

    Gokcen, Osman B

    2008-01-01

    Air Force fighter aircraft squadrons the world over share a unique problem. Each requires complex training schedules coupling aircraft to pilots, the duo to missions and airspaces, and then the entire combination to a feasible time slot...

  8. Fatigue Risk Management: The Impact of Anesthesiology Residents' Work Schedules on Job Performance and a Review of Potential Countermeasures.

    Science.gov (United States)

    Wong, Lily R; Flynn-Evans, Erin; Ruskin, Keith J

    2018-04-01

    Long duty periods and overnight call shifts impair physicians' performance on measures of vigilance, psychomotor functioning, alertness, and mood. Anesthesiology residents typically work between 64 and 70 hours per week and are often required to work 24 hours or overnight shifts, sometimes taking call every third night. Mitigating the effects of sleep loss, circadian misalignment, and sleep inertia requires an understanding of the relationship among work schedules, fatigue, and job performance. This article reviews the current Accreditation Council for Graduate Medical Education guidelines for resident duty hours, examines how anesthesiologists' work schedules can affect job performance, and discusses the ramifications of overnight and prolonged duty hours on patient safety and resident well-being. We then propose countermeasures that have been implemented to mitigate the effects of fatigue and describe how training programs or practice groups who must work overnight can adapt these strategies for use in a hospital setting. Countermeasures include the use of scheduling interventions, strategic naps, microbreaks, caffeine use during overnight and extended shifts, and the use of bright lights in the clinical setting when possible or personal blue light devices when the room lights must be turned off. Although this review focuses primarily on anesthesiology residents in training, many of the mitigation strategies described here can be used effectively by physicians in practice.

  9. 5 CFR 724.203 - Training obligations.

    Science.gov (United States)

    2010-01-01

    ...) Each agency must develop a written plan to train all of its employees (including supervisors and... materials and method of its training plan. Each agency training plan shall describe: (1) The instructional materials and method of the training, (2) The training schedule, and (3) The means of documenting completion...

  10. A survey for the evaluation of the training period of cardiology specialists in Turkey.

    Science.gov (United States)

    Yıldız, Bekir Serhat; Alkan, Mustafa Beyazıt; Güngör, Hasan; Gül, Ilker; Bilgin, Murat; Akın, Mustafa; Nalbantgil, Sanem; Zoghi, Mehdi

    2011-12-01

    To evaluate postgraduate training period, social life and problems of cardiology residents in Turkey by using a questionnaire form and to compare with the core curriculum of European Society of Cardiology for general cardiology. Overall, 529 residents of cardiology ages in range of 24-35 years (mean age: 26.5±2.0 years, 81.4% male) participated as volunteers in this cross-sectional survey study. An 86-item questionnaire form was used to evaluate the education process, capacity of knowledge and skill and social effectiveness level of participants. The questionnaire were composed both closed- and open-ended questions. The questionnaire form was filled in with the face-to-face communication method. The data of survey were compared with the core curriculum of European Society of Cardiology for general cardiology training period. Chi-square or Fischer exact test was used for statistical analysis. The participants were working in various university hospitals (70.3%) and training-research (state) hospitals in 31 different provinces in Turkey (40.8% in Marmara region). They visited 40±10 outpatients and 10±5 hospitalized pts daily in the clinics. The 3-5 residents worked at the clinic on night shifts and mostly (89%) 8 or more night shifts per month were held in their first training years. During first three-years of training 76% of residents have performed echocardiography, 40.8%-transesophageal echocardiography and 10% - intraoperative echocardiography. The 84.3% of them evaluated exercise tests, 76.4%-Holter electrocardiography and 53.3%-tilt-table tests. The rate of residents working in coronary angiography laboratories was 54.3%. The 53.7% of residents performed coronary angiography and 64%-only in the 4th year of their training. The number of coronary angiography performance was under expected when compared with European Society of Cardiology curriculum. The 18.5% of residents were participated as assistant researcher in an international multi-center study and

  11. Effects of Pre - Season Short - Term Daily Undulating Periodized Training on Muscle Strength and Sprint Performance of Under - 20 Soccer Players

    Directory of Open Access Journals (Sweden)

    Charles Ricardo L OPES

    2015-06-01

    Full Text Available The aim of this study was to evaluate the effects of daily undulating training periodization designed for maximal lower limb muscle strength and sprint performance in under - 20 soccer players. Twenty - four male athletes (age = 19.1 ± 1.2 yr; mass = 71.1 ± 6. 8 kg; height = 178.0 ± 0.1 cm participated in four weeks of a daily undulating periodized (DUP training soccer program. During the pre - and post - training periods the subjects performed a one repetition maximum (1 RM half back squat test and a 15 - meter s print. Significant training - induced changes were observed in sprint times (pre = 2.38 ± 0.01 s; post = 2.31 ± 0.02 s and 1 RM tests (pre = 107.0 ± 2.0 kg; post = 128.0 ± 2.2 kg. These results indicate that a DUP program is efficient in promoting positive neuromuscular adaptations in soccer players, even with a short - term preseason training period.

  12. Training in the Public Sector in a Period of Austerity: The Case of the UK

    Science.gov (United States)

    Jewson, Nick; Felstead, Alan; Green, Francis

    2015-01-01

    This article examines what has happened to training in public sector organisations in the UK in a period of austerity. It draws on individual-level data collected over the period 2000-2012 and establishment-level data collected from employer surveys carried out between 2005 and 2012. To understand these data further, 75 qualitative interviews with…

  13. The Effects of the Training in the Preparation Period on the Repetitive Strength Transformation with Cadet Level Football Players

    Directory of Open Access Journals (Sweden)

    Jovan Gardašević

    2016-06-01

    Full Text Available The main aim of the research was to identify a level of quantitative changes of the repetitive strength with fifteen years old football players under the influence of the programmed football training of a six weeks preparation period. The training programme covered forty-four training units. The research was made on a sample of 120 cadet level football players. To estimate the repetitive strength three tests have been used: Lying-sed for 30 seconds, Push-ups and Lifting upper body while lying on stomach. In the area of comparative statistics, we used discriminant parametric procedure t-test for big paired samples. It can be concluded that there are statistically significant differences in all three variables to estimate the repetitive strength. This confirmed the hypothesis that the expected significant positive quantitative changes of basic-motor abilities influenced by the proposed model of training in preparation period with fifteen years old football players. The authors were guided by the fact that this kind of training program in preparation period is very effective in terms of raising the repetitive strength level with fifteen years old. The obtained results can be directed towards innovation plans and programs in the preparation period, and the adaptation of the same needs of the respective population.

  14. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  15. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  16. Academic Training: Real Time Process Control - Lecture series

    CERN Multimedia

    Françoise Benz

    2004-01-01

    ACADEMIC TRAINING LECTURE REGULAR PROGRAMME 7, 8 and 9 June From 11:00 hrs to 12:00 hrs - Main Auditorium bldg. 500 Real Time Process Control T. Riesco / CERN-TS What exactly is meant by Real-time? There are several definitions of real-time, most of them contradictory. Unfortunately the topic is controversial, and there does not seem to be 100% agreement over the terminology. Real-time applications are becoming increasingly important in our daily lives and can be found in diverse environments such as the automatic braking system on an automobile, a lottery ticket system, or robotic environmental samplers on a space station. These lectures will introduce concepts and theory like basic concepts timing constraints, task scheduling, periodic server mechanisms, hard and soft real-time.ENSEIGNEMENT ACADEMIQUE ACADEMIC TRAINING Françoise Benz 73127 academic.training@cern.ch

  17. Optimal Intermittent Dose Schedules for Chemotherapy Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nadia ALAM

    2013-08-01

    Full Text Available In this paper, a design method for optimal cancer chemotherapy schedules via genetic algorithm (GA is presented. The design targets the key objective of chemotherapy to minimize the size of cancer tumor after a predefined time with keeping toxic side effects in limit. This is a difficult target to achieve using conventional clinical methods due to poor therapeutic indices of existing anti-cancer drugs. Moreover, there are clinical limitations in treatment administration to maintain continuous treatment. Besides, carefully decided rest periods are recommended to for patient’s comfort. Three intermittent drug scheduling schemes are presented in this paper where GA is used to optimize the dose quantities and timings by satisfying several treatment constraints. All three schemes are found to be effective in total elimination of cancer tumor after an agreed treatment length. The number of cancer cells is found zero at the end of the treatment for all three cases with tolerable toxicity. Finally, two of the schemes, “Fixed interval variable dose (FIVD and “Periodic dose” that are periodic in characteristic have been emphasized due to their additional simplicity in administration along with friendliness to patients. responses to the designed treatment schedules. Therefore the proposed design method is capable of planning effective, simple, patient friendly and acceptable chemotherapy schedules.

  18. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  19. The effect of a professional cricket match schedule on selected ...

    African Journals Online (AJOL)

    Enrique

    becoming more frequent and training schedules increasingly intense. In addition to ... marathon runners reported increased URTS in faster run- ners,23 a more ..... competitive versus recreational sports in cross-country skiing. Int J Sports.

  20. Effect of a Periodized Power Training Program on the Functional Performances and Contractile Properties of the Quadriceps in Sprinters

    Science.gov (United States)

    Kamandulis, Sigitas; Skurvydas, Albertas; Brazaitis, Marius; Stanislovaitis, Aleksas; Duchateau, Jacques; Stanislovaitiene, Jurate

    2012-01-01

    Our purpose was to compare the effect of a periodized preparation consisting of power endurance training and high-intensity power training on the contractile properties of the quadriceps muscle and functional performances in well trained male sprinters (n = 7). After 4 weeks of high-intensity power training, 60-m sprint running time improved by an…

  1. Duality-based algorithms for scheduling on unrelated parallel machines

    NARCIS (Netherlands)

    van de Velde, S.L.; van de Velde, S.L.

    1993-01-01

    We consider the following parallel machine scheduling problem. Each of n independent jobs has to be scheduled on one of m unrelated parallel machines. The processing of job J[sub l] on machine Mi requires an uninterrupted period of positive length p[sub lj]. The objective is to find an assignment of

  2. Different Training Loads Partially Influence Physiological Responses to the Preparation Period in Basketball.

    Science.gov (United States)

    Ferioli, Davide; Bosio, Andrea; La Torre, Antonio; Carlomagno, Domenico; Connolly, Darragh R; Rampinini, Ermanno

    2018-03-01

    Ferioli, D, Bosio, A, La Torre, A, Carlomagno, D, Connolly, DR, and Rampinini, E. Different training loads partially influence physiological responses to preparation period in basketball. J Strength Cond Res 32(3): 790-797, 2018-The aim of this study was to compare the session rating of perceived exertion training load (sRPE-TL), training volume (TV), and the changes in physical fitness between professional (n = 14) and semiprofessional (n = 18) basketball players during the preparation period. Furthermore, relationships between sRPE-TL and TV with changes in physical fitness level were investigated. The players performed the Yo-Yo intermittent recovery test-level 1 (Yo-Yo IR1) before and after the preparation period. In addition, physiological responses to a standardized 6-minute continuous running test (Mognoni's test) and to a standardized 5-minute high-intensity intermittent running test (HIT) were measured. Session rating of perceived exertion-TL and TV were greater for professional (5,241 ± 1787 AU; 914 ± 122 minutes) compared with semiprofessional players (2,408 ± 487 AU; 583 ± 65 minutes). Despite these differences, Yo-Yo IR1 performance improvements (∼30%) and physiological adaptations to the Mognoni's test were similar between the 2 groups. Furthermore, physiological adaptations to HIT were slightly greater for professional compared with semiprofessional players; however, the magnitude of these effects was only small/moderate. No clear relationships were found between sRPE-TL and changes in Yo-Yo IR1 performance and Mognoni's test (rs ± 90% confidence interval [CI]: Yo-Yo IR1, 0.18 ± 0.30; Mognoni's test, -0.14 ± 0.29). Only moderate relationships were found between sRPE-TL and changes in HIT (rs ± 90% CI: [La], -0.48 ± 0.23; [H], -0.42 ± 0.25). These results raise doubts on the effectiveness of using high sRPE-TL and TV during the preparation period to improve the physical fitness level of players. The Yo-Yo IR1 seems to be sensitive to

  3. The spirit of St. Lucie: nuclear plant built on schedule

    International Nuclear Information System (INIS)

    Derrickson, W.B.

    1984-01-01

    Florida Power and Light Company currently has four nuclear units in operation with St. Lucie Unit 2 being the last to receive an operating license in June, 1983. It's sister Unit 1 received its license in 1976 and has, through 1982, compiled one of the best operating records in the United States. The full power license for St. Lucie Unit 2 was received from the Nuclear Regulatory Commission (NRC) on June 10, 1983, just six years after construction began. The industry average for construction of nuclear plants in this time period is about 10 years. The success of the St. Lucie Unit 2 project can be at least in part attributed to planning the work, accurate and timely reporting of results via valid indicators, well trained and skilled personnel, and most of all, teamwork. During the course of the project the plant was constantly on or near schedule and always ahead of industry averages. This was done despite issuance of numerous regulations by the NRC (TMI), a 1979 hurricane which did considerable damage to the Reactor Auxiliary Building, labor problems, and an NRC schedule review team that determined the best that could be done was to complete the plant a year later. The final price tag is about $1.42 billion, including ''allowance for funds used during construction''. In operation to date the post core loading test program has been completed in less than two months, enabling the plant to be put into commercial operation only two months after its original scheduled date of May 28, 1983exclamation

  4. Evaluation of distributed practice schedules on retention of a newly acquired surgical skill: a randomized trial.

    Science.gov (United States)

    Mitchell, Erica L; Lee, Dae Y; Sevdalis, Nick; Partsafas, Aaron W; Landry, Gregory J; Liem, Timothy K; Moneta, Gregory L

    2011-01-01

    practice influences new skill acquisition. The aim of this study was to prospectively investigate the impact of practice distribution (weekly vs monthly) on complex motor skill (end-side vascular anastomosis) acquisition and 4-month retention. twenty-four surgical interns were randomly assigned to weekly training for 4 weeks or monthly training for 4 months, with equal total training times. Performance was assessed before training, immediately after training, after the completion of distributed training, and 4 months later. there was no statistical difference in surgical skill acquisition and retention between the weekly and monthly scheduled groups, as measured by procedural checklist scores, global rating scores of operative performance, final product analysis, and overall performance or assessment of operative "competence." distributed practice results in improvement and retention of a newly acquired surgical skill independent of weekly or monthly practice schedules. Flexibility in a surgical skills laboratory curriculum is possible without adversely affecting training. 2011 Elsevier Inc. All rights reserved.

  5. A study of the distribution of color Doppler flows in the superficial digital flexor tendon of young Thoroughbreds during their training periods.

    Science.gov (United States)

    Hatazoe, Takashi; Endo, Yoshiro; Iwamoto, Yohei; Korosue, Kenji; Kuroda, Taisuke; Inoue, Saemi; Murata, Daiki; Hobo, Seiji; Misumi, Kazuhiro

    2015-01-01

    Aim of this study was to evaluate the relationships of exercise and tendon injury with Doppler flows appearing in the superficial digital flexor tendon (SDFT) of young Thoroughbreds during training periods. The forelimb SDFTs of 24 one- to two-year-old Thoroughbreds clinically free of any orthopaedic disorders were evaluated using grey-scale (GS) and color Doppler (CD) images during two training periods between December 2013 to April 2015. Twelve horses per year were examined in December, February, and April in training periods that began in September and ended in April. The SDFT was evaluated in 3 longitudinal images of equal lengths (labelled 1, 2, 3 in order from proximal to distal), and 6 transversal images separated by equal lengths (labelled 1A, 1B, 2A, 2B, 3A and 3B in order from proximal to distal) of the metacarpus using both GS and CD. The running (canter and gallop) distance for 1 month before the date of the ultrasonographic examinations was increased in December, February, and April in both of the two training periods. CD flows defined as rhythmically blinking or pulsatory colored signals were found in 56 of 864 (6.4%) transversal CD images, in 28, 12, 13, and 3 images of 1A, 1B, 2A and 2B, respectively, and in 7, 14, and 35 images captured in December, February, and April, respectively. There were no longitudinal or transversal GS images indicating injury in the SDFTs in either of the two training periods. The increase of CD flows in the proximal regions of the SDFT are possibly related to the increase of the running distance during the training periods of the one- to two-year-old Thoroughbreds. Because no injury was diagnosed in the SDFTs by GS images during the training periods, the increase of CD flows in the proximal parts of SDFT is not necessarily predictive of tendon injury in the near future during the training period of young Thoroughbreds.

  6. Evaluating the marginal utility principle for long-term hydropower scheduling

    International Nuclear Information System (INIS)

    Zhao, Tongtiegang; Zhao, Jianshi; Liu, Pan; Lei, Xiaohui

    2015-01-01

    Highlights: • Analysis of one-, two- and multi-period hydropower scheduling. • Derivation of marginal cost and marginal return of carry-over storage. • Evaluation of the marginal utility principle in a case study of the Three Gorges Reservoir. - Abstract: The conversion of the potential energy of dammed water into hydropower depends on both reservoir storage and release, which are the major difficulties in hydropower reservoir operation. This study evaluates the marginal utility principle, which determines the optimal carry-over storage between periods, for long-term hydropower scheduling. Increasing marginal cost and decreasing marginal return are two important characteristics that determine the marginal utility principle in water supply. However, the notion of decreasing marginal return is inapplicable in hydropower scheduling. Instead, the carry-over storage from one period has an increasing marginal contribution to the power generation in the next period. Although carry-over storage incurs an increasing marginal cost to the power generation in the current period, the marginal return is higher than the marginal cost. The marginal return from the carry-over storage further increases in the multi-period case. These findings suggest saving as much carry-over storage as possible, which is bounded by the operational constraints of storage capacity, environmental flow, and installed capacity in actual hydropower scheduling. The marginal utility principle is evaluated for a case study of the Three Gorges Reservoir, and the effects of the constraints are discussed. Results confirm the theoretical findings and show that the marginal return from carry-over storage is larger than the marginal cost. The operational constraints help determine the optimal carry-over storage.

  7. E-learning : a high-tech solution to industry training challenges

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2007-09-15

    A web-based e-learning system used to train oilsands upgrading employees was discussed in this article. While the majority of the upgrader's staff had previously worked in the oil and gas industry, many did not have adequate control system training. Use of the system avoided the need for upgrader downtime due to staff shortages during training periods, and avoided the need for on-site instructor-led classes. Savings of over $90,000 were made on a single training course by using the web-based system. A learning content management system (LCMS) was used to develop and customize learning modules so that the software could be customized for use at different facilities. Use of the e-learning system allows staff to mesh training time with regular work schedules and can save companies thousands of hours in training time. Information on the training modules is referenced in a database so that staff members can address new or additional systems, equipment, or technologies. It was concluded that a growing number of companies are using web-based learning systems. 2 figs.

  8. Inception report: Training and technology transfer feasibility study for Tenaga Nasional Berhad. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-29

    The study, conducted by General Physics Corporation, was funded by the U.S. Trade and Development Agency. The report recommends strategies and specific actions for Tenaga Nasional Berhad`s training and technology transfer needs. The study covers the assessments made by teams of generation, transmission, distribution, management engineers and training specialists over a 4-month period. The Inception Report is divided into the following sections: (1) Project Objectives; (2) General Physics Background; (3) Project Description; (4) Project Organization; (5) Detailed Scope of Work; (6) Project Schedule; (Appendix A) Personnel Resumes; (Appendix B) General Physics Brochures.

  9. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different applications from the MCSL NOC benchmark suite. We observe that the metaheuristics perform better than the greedy solution. In the special case of all-to-all communication with equal bandwidths...

  10. Launch team training system

    Science.gov (United States)

    Webb, J. T.

    1988-01-01

    A new approach to the training, certification, recertification, and proficiency maintenance of the Shuttle launch team is proposed. Previous training approaches are first reviewed. Short term program goals include expanding current training methods, improving the existing simulation capability, and scheduling training exercises with the same priority as hardware tests. Long-term goals include developing user requirements which would take advantage of state-of-the-art tools and techniques. Training requirements for the different groups of people to be trained are identified, and future goals are outlined.

  11. Verification of reliability and validity of a Japanese version of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Suzuki, Eiko; Kanoya, Yuka; Katsuki, Takeshi; Sato, Chifumi

    2007-07-01

    To verify the reliability and validity of a Japanese version of the Rathus Assertiveness Schedule in novice nurses to contribute to nursing management. An adequate scale is needed to measure the assertiveness and the effect of assertion training for Japanese nurses and to compare them with those in other countries. Rathus Assertiveness Schedule was adapted to Japanese with back-translation and its validity was examined in 989 novice nurses. The Japanese version showed a high coefficient of reliability in a split-half reliability test (r=0.76; PAssertiveness Schedule. The Japanese version of Rathus Assertiveness Schedule was verified.

  12. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  13. Prioritizing sleep for healthy work schedules

    Science.gov (United States)

    2012-01-01

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules. PMID:22738292

  14. Prioritizing sleep for healthy work schedules

    Directory of Open Access Journals (Sweden)

    Takahashi Masaya

    2012-03-01

    Full Text Available Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work. Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  15. Prioritizing sleep for healthy work schedules.

    Science.gov (United States)

    Takahashi, Masaya

    2012-03-13

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  16. Establishing contract periods

    International Nuclear Information System (INIS)

    Huffman, F.C.

    1978-01-01

    The lead time for executing the Adjustable Fixed-Commitment (AFC) contract and exceptions which may be considered are discussed. The initial delivery period is also discussed. Delays, deferrals, and schedule adjustment charges are finally considered

  17. Training for hazardous waste workers

    Energy Technology Data Exchange (ETDEWEB)

    Favel, K.

    1990-10-26

    This implementation plan describes the system and provides the information and schedules that are necessary to comply with the Department of Energy (DOE) Albuquerque Operations Office (AL) Memorandum, Reference EPD dated September 11, 1990, Training for Hazardous Waste Workers. The memo establishes the need for identifying employees requiring environmental training, ensuring that the training is received, and meeting documentation and recordkeeping requirements for the training.

  18. Effects of resistance training periodization on performance and salivary immune-endocrine responses of elite female basketball players.

    Science.gov (United States)

    Nunes, J A; Crewther, B T; Viveiros, L; De Rose, D; Aoki, M S

    2011-12-01

    The aim of this paper was to examine the effects of resistance training periodization on the performance and salivary hormone-immune responses of elite female basketball players. Twelve female athletes were monitored across a 50 day period of resistance training that emphasized strength, endurance and power. One repetition maximum (1RM) strength, maximal repetitions at 50% 1RM and vertical jump performance was assessed pre- and post-training. Saliva samples were also collected at 0700, 0930, 1100 and 1730 hours and analyzed for testosterone (T), cortisol (C) and immunoglobulin A (IgA). Improvements in 1RM strength, maximal repetitions and vertical jump performance were identified post-training (PTraining had no effect on salivary T and C concentrations, but the T:C ratio increased at 0730 hours (Ptraining) in strength and T concentrations were positively correlated at 0730 hours (Ptraining increased muscle performance in elite female basketball players, but only minor changes in the salivary T:C ratio and IgA were noted. Correlational analysis identified a possible role for early morning changes in T as a regulator of individual strength changes.

  19. Comparison of between-training-sessions recovery strategies for world-class BMX pilots.

    Science.gov (United States)

    Marquet, Laurie-Anne; Hausswirth, Christophe; Hays, Arnaud; Vettoretti, Fabrice; Brisswalter, Jeanick

    2015-03-01

    To assess the impact of between-training-sessions recovery strategies (passive [PAS], active [ACT], cold-water immersion [CWI], and ingestion of a recovery drink [NUTR]) on maximal cycling performance, perceptions of delayed-onset muscle soreness (DOMS), and fatigue in world-class BMX riders. Eleven elite BMX athletes, members of the French national team (top country in the 2011 international ranking, 4 medals at the 2012 World Championships, top European country), participated in the study, which involved standardized training periods. Athletes performed 3 maximal-sprint power tests: the first day of the week before the training session and before and after training on the third day of the week (D3). The recovery strategy was randomly assigned to each participant on day 2 immediately after the last training period of the day. Perceptions of DOMS and general fatigue were recorded on D3. After training on D3, the decrease in maximal-sprint power (Pmax) was significantly greater for PAS than with CWI (P=.02) and NUTR (P=.018). Similar results were found with ACT (vs CWI P=.044, and vs NUTR P=.042). Self-reported DOMS and fatigue were significantly greater after PAS than after other strategies. For elite BMX riders, between training days, nutritional and/or CWI recovery strategies appear to be best for reducing muscle fatigue and increasing the capacity to withstand the training schedule.

  20. 28 CFR 345.83 - Job safety training.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  1. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  2. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  3. Medicare program; revisions to payment policies under the Physician Fee Schedule, Clinical Laboratory Fee Schedule, access to identifiable data for the Center for Medicare and Medicaid Innovation Models & other revisions to Part B for CY 2015. Final rule with comment period.

    Science.gov (United States)

    2014-11-13

    This major final rule with comment period addresses changes to the physician fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. See the Table of Contents for a listing of the specific issues addressed in this rule.

  4. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  5. Hybrid and dependent task scheduling algorithm for on-board system software

    Institute of Scientific and Technical Information of China (English)

    魏振华; 洪炳熔; 乔永强; 蔡则苏; 彭俊杰

    2003-01-01

    In order to solve the hybrid and dependent task scheduling and critical source allocation problems, atask scheduling algorithm has been developed by first presenting the tasks, and then describing the hybrid anddependent scheduling algorithm and deriving the predictable schedulability condition. The performance of thisagorithm was evaluated through simulation, and it is concluded from the evaluation results that the hybrid taskscheduling subalgorithm based on the comparison factor can be used to solve the problem of aperiodic task beingblocked by periodic task in the traditional operating system for a very long time, which results in poor schedu-ling predictability; and the resource allocation subalgorithm based on schedulability analysis can be used tosolve the problems of critical section conflict, ceiling blocking and priority inversion; and the scheduling algo-rithm is nearest optimal when the abortable critical section is 0.6.

  6. 20 CFR 628.420 - Job training plan.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  7. Performance Analysis of Stop-Skipping Scheduling Plans in Rail Transit under Time-Dependent Demand.

    Science.gov (United States)

    Cao, Zhichao; Yuan, Zhenzhou; Zhang, Silin

    2016-07-13

    Stop-skipping is a key method for alleviating congestion in rail transit, where schedules are sometimes difficult to implement. Several mechanisms have been proposed and analyzed in the literature, but very few performance comparisons are available. This study formulated train choice behavior estimation into the model considering passengers' perception. If a passenger's train path can be identified, this information would be useful for improving the stop-skipping schedule service. Multi-performance is a key characteristic of our proposed five stop-skipping schedules, but quantified analysis can be used to illustrate the different effects of well-known deterministic and stochastic forms. Problems in the novel category of forms were justified in the context of a single line rather than transit network. We analyzed four deterministic forms based on the well-known A/B stop-skipping operating strategy. A stochastic form was innovatively modeled as a binary integer programming problem. We present a performance analysis of our proposed model to demonstrate that stop-skipping can feasibly be used to improve the service of passengers and enhance the elasticity of train operations under demand variations along with an explicit parametric discussion.

  8. Performance Analysis of Stop-Skipping Scheduling Plans in Rail Transit under Time-Dependent Demand

    Directory of Open Access Journals (Sweden)

    Zhichao Cao

    2016-07-01

    Full Text Available Stop-skipping is a key method for alleviating congestion in rail transit, where schedules are sometimes difficult to implement. Several mechanisms have been proposed and analyzed in the literature, but very few performance comparisons are available. This study formulated train choice behavior estimation into the model considering passengers’ perception. If a passenger’s train path can be identified, this information would be useful for improving the stop-skipping schedule service. Multi-performance is a key characteristic of our proposed five stop-skipping schedules, but quantified analysis can be used to illustrate the different effects of well-known deterministic and stochastic forms. Problems in the novel category of forms were justified in the context of a single line rather than transit network. We analyzed four deterministic forms based on the well-known A/B stop-skipping operating strategy. A stochastic form was innovatively modeled as a binary integer programming problem. We present a performance analysis of our proposed model to demonstrate that stop-skipping can feasibly be used to improve the service of passengers and enhance the elasticity of train operations under demand variations along with an explicit parametric discussion.

  9. The effect of repeated periods of speed endurance training on performance, running economy and muscle adaptations

    DEFF Research Database (Denmark)

    Skovgaard, Casper; Almquist, Nicki Winfield; Bangsbo, Jens

    2018-01-01

    sessions during two 40-day periods (P1 and P2) separated by ~80 days of habitual training. Before and after both P1 and P2, subjects completed an incremental test to exhaustion to determine VO2 -max and a repeated running test at 90% vVO2 -max to exhaustion (RRT) to determine short-term endurance capacity......, with no change in P1. No changes in muscle expression of Na(+) ,K(+) -ATPase α1, α2 and β1, NHE1, SERCA1 and SERCA2, actin and CamKII were found during neither P1 nor P2. Thus, the present study demonstrates that a second period of intense training leads to improved short-term performance and further improved RE...

  10. Scheduled meals and scheduled palatable snacks synchronize circadian rhythms: consequences for ingestive behavior.

    Science.gov (United States)

    Escobar, Carolina; Salgado, Roberto; Rodriguez, Katia; Blancas Vázquez, Aurea Susana; Angeles-Castellanos, Manuel; Buijs, Ruud M

    2011-09-26

    Food is a potent time signal for the circadian system and has shown to entrain and override temporal signals transmitted by the biological clock, the suprachiasmatic nucleus, which adjusts mainly to the daily light/dark (LD) alternation. Organisms mostly ingest food in their active period and this permits a correct coordination between the LD and the food elicited time signals with the circadian system. Under conditions when feeding opportunities are shifted to the usual resting/sleep phase, the potent entraining force of food, shifts circadian fluctuations in several tissues, organs, and brain structures toward meal time, resulting a desynchrony within the body and between the organism and the external LD cycle. The daily scheduled access to a palatable snack exerts similar changes specifically to brain areas involved in motivation and reward responses. This review describes the phenomenology of food entrainment and entrainment by a palatable snack. It suggests how scheduled feeding can lead to food addiction and how shifted feeding schedules toward the sleep phase can result in altered ingestive behavior, obesity and disturbed metabolic responses. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  12. Scheduling strategies for cycle scavenging in multicluster grid systems

    NARCIS (Netherlands)

    Sonmez, O.O.; Grundeken, B.; Mohamed, H.H.; Iosup, A.; Epema, D.H.J.

    2009-01-01

    The use of today's multicluster grids exhibits periods of submission bursts with periods of normal use and even of idleness. To avoid resource contention, many users employ observational scheduling, that is, they postpone the submission of relatively low-priority jobs until a cluster becomes

  13. A hybrid online scheduling mechanism with revision and progressive techniques for autonomous Earth observation satellite

    Science.gov (United States)

    Li, Guoliang; Xing, Lining; Chen, Yingwu

    2017-11-01

    The autonomicity of self-scheduling on Earth observation satellite and the increasing scale of satellite network attract much attention from researchers in the last decades. In reality, the limited onboard computational resource presents challenge for the online scheduling algorithm. This study considered online scheduling problem for a single autonomous Earth observation satellite within satellite network environment. It especially addressed that the urgent tasks arrive stochastically during the scheduling horizon. We described the problem and proposed a hybrid online scheduling mechanism with revision and progressive techniques to solve this problem. The mechanism includes two decision policies, a when-to-schedule policy combining periodic scheduling and critical cumulative number-based event-driven rescheduling, and a how-to-schedule policy combining progressive and revision approaches to accommodate two categories of task: normal tasks and urgent tasks. Thus, we developed two heuristic (re)scheduling algorithms and compared them with other generally used techniques. Computational experiments indicated that the into-scheduling percentage of urgent tasks in the proposed mechanism is much higher than that in periodic scheduling mechanism, and the specific performance is highly dependent on some mechanism-relevant and task-relevant factors. For the online scheduling, the modified weighted shortest imaging time first and dynamic profit system benefit heuristics outperformed the others on total profit and the percentage of successfully scheduled urgent tasks.

  14. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    month; the necessary rate of a month; the quantities to be completed before half period of the project; the quantities to be achieved before the cold function test. Due to a lot of documents and equipment in LANP, it is impossible to present their supply dates one by one in the level 2 project schedule. The rules, in reference to the corresponding construction starting dates, were given to define the supply dates. The good practices of construction schedule control are presented, including draft of a construction program, performance evaluation, specific coordination meeting and Work Load Point application. The schedule control culture is described, that is one core, two criteria, three control mechanisms, four resources to be secured. (author)

  15. Effect of Myostatin SNP on muscle fiber properties in male Thoroughbred horses during training period.

    Science.gov (United States)

    Miyata, Hirofumi; Itoh, Rika; Sato, Fumio; Takebe, Naoya; Hada, Tetsuro; Tozaki, Teruaki

    2017-10-20

    Variants of the Myostatin gene have been shown to have an influence on muscle hypertrophy phenotypes in a wide range of mammalian species. Recently, a Thoroughbred horse with a C-Allele at the g.66493737C/T single-nucleotide polymorphism (SNP) has been reported to be suited to short-distance racing. In this study, we examined the effect of the Myostatin SNP on muscle fiber properties in young Thoroughbred horses during a training period. To investigate the effect of the Myostatin SNP on muscle fiber before training, several mRNA expressions were relatively quantified in biopsy samples from the middle gluteal muscle of 27 untrained male Thoroughbred horses (1.5 years old) using real-time RT-PCR analysis. The remaining muscle samples were used for immunohistochemical analysis to determine the population and area of each fiber type. All measurements were revaluated in biopsy samples of the same horses after a 5-month period of conventional training. Although the expressions of Myostatin mRNA decreased in all SNP genotypes, a significant decrease was found in only the C/C genotype after training. While, expression of VEGFa, PGC1α, and SDHa mRNAs, which relate to the biogenesis of mitochondria and capillaries, was significantly higher (54-82%) in the T/T than the C/C genotypes after training. It is suggested that hypertrophy of muscle fiber is directly associated with a decrease in Myostatin mRNA expression in the C/C genotype, and that increased expressions of VEGFa, PGC1α, and SDHa in the T/T genotype might be indirectly caused by the Myostatin SNP.

  16. 76 FR 71079 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-11-16

    ... including documentation on ethics training and guidance received by staff. 25. Social Security... year Federal agencies create billions of records on paper, film, magnetic tape, and other media. To... include records proposed as permanent. The schedules listed in this notice are media neutral unless...

  17. Efficiency of the technique of the training process of highly skilled bodybuilders of the mesomorphic type of constitution in the competitive period

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskіy

    2016-10-01

    Full Text Available Purpose: foundation of efficiency of the technique of the training process of highly skilled bodybuilders in the competitive period. Material & Methods: 16 highly skilled bodybuilders of 22–30 years old participated in the research, the average body weight of sportsmen makes 872 – 1022 kg, which are included in the structure of the national team of Ukraine on bodybuilding. Methods: method of the theoretical analysis and generalization of literature, pedagogical observation, pedagogical experiment, method of mathematical statistics. Results: the comparative characteristic of the most often used techniques of the training process in bodybuilding is provided. The effective technique for highly skilled bodybuilders of the mesomorphic type of constitution, depending on the initial uniform of a sportsman at the beginning of the competitive period of training is developed and proved. Dependence of change of body weight of a bodybuilder on the training process is directed. Conclusions: on the effective training method, depending on microcycle of trainings in the competitive period precompetitive and competitive mesocycles (selection and main competitions, is offered the basis of the conducted research.

  18. A seven day running training period increases basal urinary hepcidin levels as compared to cycling

    NARCIS (Netherlands)

    Sim, M.; Dawson, B.; Landers, G.J.; Swinkels, D.W.; Tjalsma, H.; Wiegerinck, E.T.G.; Trinder, D.; Peeling, P.

    2014-01-01

    BACKGROUND: This investigation compared the effects of an extended period of weight-bearing (running) vs. non-weight-bearing (cycling) exercise on hepcidin production and its implications for iron status. METHODS: Ten active males performed two separate exercise training blocks with either running

  19. Using Scheduled Ordering to Improve the Performance of Distribution Supply Chains

    OpenAIRE

    Lucy Gongtao Chen; Srinagesh Gavirneni

    2010-01-01

    We study a supply chain with one supplier and many retailers that face exogenous end-customer demands. The supplier and the retailers all try to minimize their own inventory-related costs. In contrast to the retailers' newsvendor-type ordering behavior (under which retailers may place orders freely in every period), we propose two scheduled ordering policies: the scheduled balanced ordering policy (SBOP) and the scheduled synchronized ordering policy (SSOP). Under both the SBOP and SSOP, reta...

  20. QoS Differentiated and Fair Packet Scheduling in Broadband Wireless Access Networks

    Directory of Open Access Journals (Sweden)

    Zhang Yan

    2009-01-01

    Full Text Available This paper studies the packet scheduling problem in Broadband Wireless Access (BWA networks. The key difficulties of the BWA scheduling problem lie in the high variability of wireless channel capacity and the unknown model of packet arrival process. It is difficult for traditional heuristic scheduling algorithms to handle the situation and guarantee satisfying performance in BWA networks. In this paper, we introduce learning-based approach for a better solution. Specifically, we formulate the packet scheduling problem as an average cost Semi-Markov Decision Process (SMDP. Then, we solve the SMDP by using reinforcement learning. A feature-based linear approximation and the Temporal-Difference learning technique are employed to produce a near optimal solution of the corresponding SMDP problem. The proposed algorithm, called Reinforcement Learning Scheduling (RLS, has in-built capability of self-training. It is able to adaptively and timely regulate its scheduling policy according to the instantaneous network conditions. Simulation results indicate that RLS outperforms two classical scheduling algorithms and simultaneously considers: (i effective QoS differentiation, (ii high bandwidth utilization, and (iii both short-term and long-term fairness.

  1. The scheduling of repeat cesarean section operations: prospective management protocol experience.

    Science.gov (United States)

    Read, J A

    1985-03-01

    There are benefits to patients and a busy obstetric service if repeat cesarean section operations are performed on a scheduled basis. Optimum management avoids prematurity and reduces the need for amniocentesis. Over a period of 20 months repeat cesarean sections were performed at Tripler Army Medical Center while a protocol with the following elements was used: (1) known last menstrual period; (2) landmarks: positive urine human chorionic gonadotropin test by 6 weeks, Doppler fetal heart tone by 12 weeks, date determination by examination before 10 weeks, fetoscope fetal heart tone by 20 weeks, and date determination by size before 30 weeks; (3) date determination by midtrimester sonogram(s); (4) normal third-trimester glucose screening; (5) biparietal diameter of 9.2 or 9.5 cm before scheduling. With two or more clinical landmarks and one date by sonogram or one landmark and date by two sonograms, elective repeat cesarean section was scheduled at 39 weeks if the biparietal diameter was greater than or equal to 9.2 cm (127). If dates by sonogram were less than dates by last menstrual period but greater than 1 week or if last menstrual period was unknown, dates by sonogram and landmarks corresponding to dates by sonogram were used to electively schedule, with biparietal diameters of 9.2 or 9.5 cm respectively required (28). If protocol criteria were not met or earlier delivery was indicated (e.g., vertical scar or diabetes), amniocentesis was performed (42), except when not possible, advisable, or refused when patients either elected labor (20) or were scheduled if three or more criteria for 40+ weeks were met (18). Of 225 patients (70.5%) scheduled by protocol (173), amniocentesis (34), or medical indication (18), 188 (58.9%) were delivered without labor. In the 147 patients (46.1%) delivered electively by protocol without labor or amniocentesis, there were no cases of respiratory distress syndrome and the mean birth weight was 3517 gm. With early care and better

  2. An Automatic Course Scheduling Approach Using Instructors' Preferences

    Directory of Open Access Journals (Sweden)

    Hossam Faris

    2012-03-01

    Full Text Available University Courses Timetabling problem has been extensively researched in the last decade. Therefore, numerous approaches were proposed to solve UCT problem. This paper proposes a new approach to process a sequence of meetings between instructors, rooms, and students in predefined periods of time with satisfying a set of constraints divided in variety of types. In addition, this paper proposes new representation for courses timetabling and conflict-free for each time slot by mining instructor preferences from previous schedules to avoid undesirable times for instructors. Experiments on different real data showed the approach achieved increased satisfaction degree for each instructor and gives feasible schedule with satisfying all hard constraints in construction operation. The generated schedules have high satisfaction degrees comparing with schedules created manually. The research conducts experiments on collected data gathered from the computer science department and other related departments in Jordan University of Science and Technology- Jordan.

  3. The effect of repeated periods of speed endurance training on performance, running economy, and muscle adaptations.

    Science.gov (United States)

    Skovgaard, C; Almquist, N W; Bangsbo, J

    2018-02-01

    The effect of repeated intense training interventions was investigated in eight trained male runners (maximum oxygen uptake [VO 2 -max]: 59.3±3.2 mL/kg/min, mean±SD) who performed 10 speed endurance training (SET; repeated 30-seconds "all-out" bouts) and 10 aerobic moderate-intensity training sessions during two 40-day periods (P1 and P2) separated by ~80 days of habitual training. Before and after both P1 and P2, subjects completed an incremental test to exhaustion to determine VO 2 -max and a repeated running test at 90% vVO 2 -max to exhaustion (RRT) to determine short-term endurance capacity. In addition, running economy (RE) was measured at 60% vVO 2 -max (11.9±0.5 km/h) and v10-km (14.3±0.9 km/h), a 10-km track-running test was performed, and a biopsy from m. vastus lateralis was collected. 10-km performance and VO 2 -max (mL/min) were the same prior to P1 and P2, whereas RE was better (P<.05) before P2 than before P1. During P1 and P2, 10-km performance (2.9% and 2.3%), VO 2 -max (2.1% and 2.6%), and RE (1.9% and 1.8% at 60% vVO 2 -max; 1.6% and 2.0% at v10-km) improved (P<.05) to the same extent, respectively. Performance in RRT was 20% better (P<.05) after compared to before P2, with no change in P1. No changes in muscle expression of Na + ,K + -ATPase α1, α2 and β1, NHE1, SERCA1 and SERCA2, actin, and CaMKII were found during neither P1 nor P2. Thus, the present study demonstrates that a second period of intense training leads to improved short-term performance and further improved RE, whereas 10-km performance and VO 2 -max improve to the same extent as during the first period. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  4. 77 FR 70835 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-11-27

    ... what happens to records when no longer needed for current Government business. They authorize the... them to conduct its business. Some schedules are comprehensive and cover all the records of an agency...-0478-2012-0002, 2 items, 2 temporary items). Training manuals, syllabi, textbooks, and other materials...

  5. A basic period approach to the economic lot scheduling problem with shelf life considerations

    NARCIS (Netherlands)

    Soman, C.A.; van Donk, D.P.; Gaalman, G.J.C.

    2004-01-01

    Almost all the research on the economic lot scheduling problem (ELSP) considering limited shelf life of products has assumed a common cycle approach and an unrealistic assumption of possibility of deliberately reducing the production rate. In many cases, like in food processing industry where

  6. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach

    Science.gov (United States)

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  7. STS-71 astronauts training in Russia

    Science.gov (United States)

    1994-01-01

    Astronauts Norman E. Thagard and Bonnie J. Dunbar in cosmonaut space suits in the Training Simulator Facility at the Gagarin Cosmonaut Training Center (Star City), near Moscow, Russia. In March 1995, astronaut Thagard is scheduled to be launched in a Russ

  8. 75 FR 28071 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-05-19

    ... authorized for disposal or reduce the retention period of records already authorized for disposal. NARA... this accumulation, agency records managers prepare schedules proposing retention periods for records... information concerning evaluations of enlisted personnel. Included are job ratings as well as information...

  9. 77 FR 37443 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-06-21

    ... an electronic information system used to track review action assignments and customer satisfaction... disposal or reduce the retention period of records already authorized for disposal. NARA invites public... accumulation, agency records managers prepare schedules proposing retention periods for records and submit...

  10. Automation of controller's management by train work on the byelorussian ferrous road

    Directory of Open Access Journals (Sweden)

    A.A. Erofeev

    2012-04-01

    Full Text Available The description of the automated system of working out of the look-ahead train schedule is resulted. Appointment, structure and system structure are considered. Requirements to the entrance information are established. Procedures of automatic construction and dispatching updatings of the look-ahead train schedule are regulated

  11. Bilevel Fuzzy Chance Constrained Hospital Outpatient Appointment Scheduling Model

    Directory of Open Access Journals (Sweden)

    Xiaoyang Zhou

    2016-01-01

    Full Text Available Hospital outpatient departments operate by selling fixed period appointments for different treatments. The challenge being faced is to improve profit by determining the mix of full time and part time doctors and allocating appointments (which involves scheduling a combination of doctors, patients, and treatments to a time period in a department optimally. In this paper, a bilevel fuzzy chance constrained model is developed to solve the hospital outpatient appointment scheduling problem based on revenue management. In the model, the hospital, the leader in the hierarchy, decides the mix of the hired full time and part time doctors to maximize the total profit; each department, the follower in the hierarchy, makes the decision of the appointment scheduling to maximize its own profit while simultaneously minimizing surplus capacity. Doctor wage and demand are considered as fuzzy variables to better describe the real-life situation. Then we use chance operator to handle the model with fuzzy parameters and equivalently transform the appointment scheduling model into a crisp model. Moreover, interactive algorithm based on satisfaction is employed to convert the bilevel programming into a single level programming, in order to make it solvable. Finally, the numerical experiments were executed to demonstrate the efficiency and effectiveness of the proposed approaches.

  12. Periods found in heat measurements obtained by calorimetry

    International Nuclear Information System (INIS)

    Jordan, K.C.

    1984-01-01

    During a span of 640 days, a periodicity of 1.5158 +- 0.0008 days was discovered in successive heater equilibria on Calorimeter No. 127. Measurements were taken at 12-h intervals, with occasional changes of exactly 3 or 6 h in the schedule of measurements. This schedule eliminated all other possible periods except a period of 0.150156 days. Periods of 1.519125 and 1.511283 days were discovered in data on the excess length of day as obtained by the US Naval Observatory over a period of 24 y. These two periods could equally well represent periods of 0.150189 and 0.150112 days, since measurements were obtained only once every 24 h. It is suggested that periods observed in sensitive calorimeters and in length of day data may be related. 1 reference, 6 figures, 5 tables

  13. Chapter 5: Training

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2018-04-01

    The chapter 5 presents the 1) initial training; 2) periodic training, which includes: a) periodic training for employees at lower levels of the hierarchy than that of the operator; b) period training for operators; 3) operator training; 4) record of training; 5) safety culture.

  14. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  15. Positive performance and health effects of a football training program over 12 weeks can be maintained over a 1-year period with reduced training frequency

    DEFF Research Database (Denmark)

    Randers, Morten Bredsgaard; Nielsen, Jens Jung; Krustrup, Birgitte Rejkjær

    2010-01-01

    We examined whether improvements in the performance and health profile of an intensive 12-week football intervention could be maintained with a reduced training frequency. Seventeen healthy untrained males completed the study. Ten subjects trained 2.4 times/week for 12 weeks and another 52 weeks ...... unaltered for CG. In conclusion, positive adaptations in cardiovascular fitness obtained over 12 weeks of regular recreational football training can be maintained over a 1-year period with a reduced training frequency, with further development in musculo-skeletal fitness.......We examined whether improvements in the performance and health profile of an intensive 12-week football intervention could be maintained with a reduced training frequency. Seventeen healthy untrained males completed the study. Ten subjects trained 2.4 times/week for 12 weeks and another 52 weeks...... (P12 weeks. After 64 weeks, quadriceps muscle mass (11%), mean fiber area (10%) and citrate synthase activity (18%) were higher (P

  16. Change in maximal fat oxidation in response to different regimes of periodized high-intensity interval training (HIIT).

    Science.gov (United States)

    Astorino, Todd A; Edmunds, Ross M; Clark, Amy; Gallant, Rachael; King, Leesa; Ordille, Gina M; Heath, Brendyn; Montell, Matthew; Bandong, Jason

    2017-04-01

    Increased capacity for fat oxidation (FatOx) is demonstrated in response to chronic endurance training as well as high-intensity interval training (HIIT). This study examined changes in maximal fat oxidation (MFO) in response to 20 sessions of periodized HIIT in an attempt to identify if various regimes of HIIT similarly augment capacity for FatOx. Thirty-nine habitually active men and women (mean age and VO 2 max = 22.5 ± 4.4 year and 40.0 ± 5.6 mL/kg/min) completed training and 32 men and women with similar physical activity and fitness level served as non-exercising controls (CON). Training consisted of ten sessions of progressive low-volume HIIT on the cycle ergometer after which participants completed an additional ten sessions of sprint interval training (SIT), high-volume HIIT, or periodized HIIT, whose assignment was randomized. Before and throughout training, MFO, FatOx, and carbohydrate oxidation (CHOOx) were assessed during progressive cycling to exhaustion. Compared to CON, there was no effect of HIIT on MFO (p = 0.11). Small increases (p = 0.03) in FatOx were evident in response to HIIT leading to an additional 4.3 g of fat oxidized, although this value may not be clinically meaningful. Our results refute the widely reported increases in capacity for FatOx demonstrated with HIIT, which is likely due to marked day-to-day variability in determinations of MFO and exercise fat oxidation as well as the heterogeneity of our sample.

  17. Efficient scheduling request algorithm for opportunistic wireless access

    KAUST Repository

    Nam, Haewoon

    2011-08-01

    An efficient scheduling request algorithm for opportunistic wireless access based on user grouping is proposed in this paper. Similar to the well-known opportunistic splitting algorithm, the proposed algorithm initially adjusts (or lowers) the threshold during a guard period if no user sends a scheduling request. However, if multiple users make requests simultaneously and therefore a collision occurs, the proposed algorithm no longer updates the threshold but narrows down the user search space by splitting the users into multiple groups iteratively, whereas the opportunistic splitting algorithm keeps adjusting the threshold until a single user is found. Since the threshold is only updated when no user sends a request, it is shown that the proposed algorithm significantly alleviates the burden of the signaling for the threshold distribution to the users by the scheduler. More importantly, the proposed algorithm requires a less number of mini-slots to make a user selection given a certain scheduling outage probability. © 2011 IEEE.

  18. Video game training and the reward system.

    Science.gov (United States)

    Lorenz, Robert C; Gleich, Tobias; Gallinat, Jürgen; Kühn, Simone

    2015-01-01

    Video games contain elaborate reinforcement and reward schedules that have the potential to maximize motivation. Neuroimaging studies suggest that video games might have an influence on the reward system. However, it is not clear whether reward-related properties represent a precondition, which biases an individual toward playing video games, or if these changes are the result of playing video games. Therefore, we conducted a longitudinal study to explore reward-related functional predictors in relation to video gaming experience as well as functional changes in the brain in response to video game training. Fifty healthy participants were randomly assigned to a video game training (TG) or control group (CG). Before and after training/control period, functional magnetic resonance imaging (fMRI) was conducted using a non-video game related reward task. At pretest, both groups showed strongest activation in ventral striatum (VS) during reward anticipation. At posttest, the TG showed very similar VS activity compared to pretest. In the CG, the VS activity was significantly attenuated. This longitudinal study revealed that video game training may preserve reward responsiveness in the VS in a retest situation over time. We suggest that video games are able to keep striatal responses to reward flexible, a mechanism which might be of critical value for applications such as therapeutic cognitive training.

  19. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  20. The Hinton train disaster.

    Science.gov (United States)

    Smiley, A M

    1990-10-01

    In February of 1986 a head-on collision occurred between a freight train and a passenger train in western Canada killing 23 people and causing over $30 million of damage. A Commission of Inquiry appointed by the Canadian government concluded that human error was the major reason for the collision. This report discusses the factors contributing to the human error: mainly poor work-rest schedules, the monotonous nature of the train driving task, insufficient information about train movements, and the inadequate backup systems in case of human error.

  1. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  2. A Hyper-Heuristic Ensemble Method for Static Job-Shop Scheduling.

    Science.gov (United States)

    Hart, Emma; Sim, Kevin

    2016-01-01

    We describe a new hyper-heuristic method NELLI-GP for solving job-shop scheduling problems (JSSP) that evolves an ensemble of heuristics. The ensemble adopts a divide-and-conquer approach in which each heuristic solves a unique subset of the instance set considered. NELLI-GP extends an existing ensemble method called NELLI by introducing a novel heuristic generator that evolves heuristics composed of linear sequences of dispatching rules: each rule is represented using a tree structure and is itself evolved. Following a training period, the ensemble is shown to outperform both existing dispatching rules and a standard genetic programming algorithm on a large set of new test instances. In addition, it obtains superior results on a set of 210 benchmark problems from the literature when compared to two state-of-the-art hyper-heuristic approaches. Further analysis of the relationship between heuristics in the evolved ensemble and the instances each solves provides new insights into features that might describe similar instances.

  3. Astronaut Neil Armstrong participates in simulation training

    Science.gov (United States)

    1969-01-01

    Astronaut Neil A. Armstrong, Apollo 11 commander, participates in simulation training in preparation for the scheduled lunar landing mission. He is in the Apollo Lunar Module Mission SImulator in the Kennedy Space Center's Flight Crew Training Building.

  4. Virtual reality simulation for the operating room: proficiency-based training as a paradigm shift in surgical skills training.

    Science.gov (United States)

    Gallagher, Anthony G; Ritter, E Matt; Champion, Howard; Higgins, Gerald; Fried, Marvin P; Moses, Gerald; Smith, C Daniel; Satava, Richard M

    2005-02-01

    To inform surgeons about the practical issues to be considered for successful integration of virtual reality simulation into a surgical training program. The learning and practice of minimally invasive surgery (MIS) makes unique demands on surgical training programs. A decade ago Satava proposed virtual reality (VR) surgical simulation as a solution for this problem. Only recently have robust scientific studies supported that vision A review of the surgical education, human-factor, and psychology literature to identify important factors which will impinge on the successful integration of VR training into a surgical training program. VR is more likely to be successful if it is systematically integrated into a well-thought-out education and training program which objectively assesses technical skills improvement proximate to the learning experience. Validated performance metrics should be relevant to the surgical task being trained but in general will require trainees to reach an objectively determined proficiency criterion, based on tightly defined metrics and perform at this level consistently. VR training is more likely to be successful if the training schedule takes place on an interval basis rather than massed into a short period of extensive practice. High-fidelity VR simulations will confer the greatest skills transfer to the in vivo surgical situation, but less expensive VR trainers will also lead to considerably improved skills generalizations. VR for improved performance of MIS is now a reality. However, VR is only a training tool that must be thoughtfully introduced into a surgical training curriculum for it to successfully improve surgical technical skills.

  5. Features of the training process of handball players of higher qualification between rounds in the competitive period

    Directory of Open Access Journals (Sweden)

    V.A. Tyshchenko

    2015-01-01

    Full Text Available Purpose : the technology of preparation of athletes in accordance with the requirements of the system approach. Team management methodology disclosed in terms of the training process in the competitive period between rounds of the regular championship of Ukraine. Material : the experiment involved 85 athletes aged 18-32 years. Results : The recommended during pilot training to perform technical and tactical actions in lockstep future games. Testing and modeling training - at a more complete simulation of conditions of competition. Shock training to perform with significant excess volume and intensity. Shock-modeling training - close to a match where the simulated conditions and confounding factor. The most efficient and effective indicators to consider: the number of substitutions in one match - 8-12 times; residence time player on the court - 12-15 minutes; preferred time of travel players during replacement - 3-5 minutes; heart rate after a rest - 100-120 beats per minute. Conclusions : The developed model microcycle training process handball players between rounds of the Championship of Ukraine.

  6. The personalized sport trainning in its periods

    Directory of Open Access Journals (Sweden)

    Vladimir Medina Vaillant

    2014-12-01

    Full Text Available The sport training is a process that, by means of the physical exercise, tends to reach a more or less high level according to the proposed objectives, causing a modification of the physical, motor, cognitive and affective state on the athletes with the aim to obtain competitive results. It can also be defined as the main form of putting into practice the sportsman's preparation, being the most important features the fact that it represents an organized didactic process which is characterized by the rigorous use of all teaching, education and selfeducacion process factors, as well as a methodological system of the physical exercises that constitutes the base of the sport training with the purpose of achieving the biggest effect in the development, whenever it is possible to direct the process of sport improvement fully. The personality is a concrete person in all his/her social and psychological particularities diversity; it is the subject of the social activity and of the social relationships. One of the most characteristic aspects in the human personality is his/her individuality, understanding it as a group, only in his/her gender, with psychological particularities that makes each individual different from the other ones, in relation with the character, the temperament, the peculiarities to reflect the psychic processes, the group of feelings and reasons for the activity. The understanding and the consideration of the individual particularities have a great importance in the sportsman's practical life during the training. Starting from the inadequacies detected in the trainings and competitions connected with the athletes’ preparation, assimilation and application of the received knowledge, we propose the present material about personalized training, like tool for trainers´ development in order to achieve the sportsman's more complete preparation, taking into account the contemporary training direction. There were used investigative

  7. An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility

    Directory of Open Access Journals (Sweden)

    Lianfei Yu

    2017-01-01

    Full Text Available Efficient scheduling for the supporting operations of aircrafts in flight deck is critical to the aircraft carrier, and even several seconds’ improvement may lead to totally converse outcome of a battle. In the paper, we ameliorate the supporting operations of carrier-based aircrafts and investigate three simultaneous operation relationships during the supporting process, including precedence constraints, parallel operations, and sequence flexibility. Furthermore, multifunctional aircrafts have to take off synergistically and participate in a combat cooperatively. However, their takeoff order must be restrictively prioritized during the scheduling period accorded by certain operational regulations. To efficiently prioritize the takeoff order while minimizing the total time budget on the whole takeoff duration, we propose a novel mixed integer liner programming formulation (MILP for the flight deck scheduling problem. Motivated by the hardness of MILP, we design an improved differential evolution algorithm combined with typical local search strategies to improve computational efficiency. We numerically compare the performance of our algorithm with the classical genetic algorithm and normal differential evolution algorithm and the results show that our algorithm obtains better scheduling schemes that can meet both the operational relations and the takeoff priority requirements.

  8. [Different strength intermittent treadmill training of growth period rats and related bone metabolism of the hormone influence].

    Science.gov (United States)

    Xie, Shun-cheng; Ma, Xue-jun; Guo, Cheng-ji; Liu, Hong-zhen

    2012-05-01

    To explore the influence of different strength intermittent treadmill training of growth period rats on the bone metabolism, so as to provide the training intensity of teenagers to set theory support. Select 70 male four weeks Wistar rats according to body weight randomly divided into seven groups (n = 10): the control group and the exercise group. According to the VO2max the exercise group was divided into 6 groups: 65%, 70%, 75%, 80%, 85% and 90% group. Nine weeks treadmill training, training six days a week, each group of training three times, each time not less than 10min, the interval was 30 min. The last movement after 24 h, took the femur and blood to measured the bone mineral density (BMD), bone mass (BMC) and alkaline phosphatase (AKP), resist tartaric acid acidic phosphatase (Str-ACP). 1. The femoral BMD (0.1393 +/- 0.0031), BMC (0.4525 +/- 0.0335) of 70% group were significantly higher than those in the control group (BMD: 0.1200 +/- 0.0095, BMC: 0.3238 +/- 0.0485) and the other sports group (65% BMD:0.1339 +/- 0.0062, BMC: 0.4058 +/- 0.0492, 75% BMD: 0.1296 +/- 0.0015, BMC: 0.3869 +/- 0.0254, 80% BMD: 0.1223 +/- 0.0082, BMC: 0.3454 +/- 0.0483, 85% BMD: 0.1250 +/- 0.0044, BMC: 0.3731 +/- 0.0381, 90% BMD: 0.1171 +/- 0.0047, BMC: 0.3051 +/- 0.0286) (P growth period rat bone mass and bone mineral density to increase obviously.

  9. 76 FR 20518 - Self-Certification and Employee Training of Mail-Order Distributors of Scheduled Listed Chemical...

    Science.gov (United States)

    2011-04-13

    ... regulated sellers--i.e., retail stores and mobile retail vendors--of scheduled listed chemical products. To... scheduled listed chemical products at retail. Sales at retail are those sales intended for personal use... available for public inspection online at http://www.regulations.gov and in the Drug Enforcement...

  10. Using Activity Schedules to Increase On-Task Behavior in Children at Risk for Attention-Deficit/Hyperactivity Disorder

    Science.gov (United States)

    Cirelli, Christe A.; Sidener, Tina M.; Reeve, Kenneth F.; Reeve, Sharon A.

    2016-01-01

    The effects of activity schedules on on-task and on-schedule behavior were assessed with two boys at risk for attention-deficit/hyperactivity disorder (ADHD) and referred by their public school teachers as having difficulty during independent work time. On-task behavior increased for both participants after two training sessions. Teachers, peers,…

  11. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  12. Interruption of scheduled, automatic feeding and reduction of excess energy intake in toddlers.

    Science.gov (United States)

    Ciampolini, Mario; Brenna, J Thomas; Giannellini, Valerio; Bini, Stefania

    2013-01-01

    Childhood obesity due to the consumption of excess calories is a severe problem in developed countries. In a previous investigation on toddlers, hospital laboratory measurements showed an association of food-demand behavior with constant lower blood glucose before meals than for scheduled meals. We hypothesize that maternal scheduling of meals for toddlers results in excess energy intake compared to feeding only on demand (previously "on request"). We tested the cross-sectional null hypothesis of no difference in energy intake between scheduled (automatic) and demanded meals (administered after evaluation) in 24 mother-toddler (21 months old at entry) pairs with chronic, nonspecific diarrhea presenting at a clinic. We tested the same hypothesis in a subset of 14 toddlers by measuring the resting (sleeping) metabolic rate 4 hours after lunch, as well as the total daily energy expenditure (TEE) in 10 toddlers. We trained mothers to recognize meal demands (as in the previous investigation) and to provide food in response, but required no blood glucose measurements before meals. Energy intake was assessed by a 10-day food diary, resting metabolic rate (RMR) by respiratory analyses (indirect calorimetry) in 14 toddlers, and TEE by doubly labeled water in 10 toddlers. Their blood parameters, anthropometry, and number of days with diarrhea were assessed before training and 50 days after training. RMR decreased from 58.6 ± 7.8 to 49.0 ± 9.1 kcal/kg/d (P kcal/kg/d (P kcal/kg/d (P < 0.001). The height Z-score increased significantly, while weight growth was normal. Toddlers entering the study over the median RMR decreased their RMR significantly more than those below the median RMR (P < 0.01). Scheduled meal suspension induces meal demand frequency to increase. Demanded meals are associated with significantly lower energy intake, RMR, and TEE than scheduled meals. Feeding on demand may be an effective skill in a strategy for reducing excess energy intake in the long term

  13. Digestive oncologist in the gastroenterology training curriculum

    Science.gov (United States)

    Mulder, Chris Jacob Johan; Peeters, Marc; Cats, Annemieke; Dahele, Anna; Droste, Jochim Terhaar sive

    2011-01-01

    Until the late 1980s, gastroenterology (GE) was considered a subspecialty of Internal Medicine. Today, GE also incorporates Hepatology. However, Digestive Oncology training is poorly defined in the Hepatogastroenterology (HGE)-curriculum. Therefore, a Digestive Oncology curriculum should be developed and this document might be a starting point for such a curriculum. HGE-specialists are increasingly resisting the paradigm in which they play only a diagnostic and technical role in the management of digestive tumors. We suggest minimum end-points in the standard HGE-curriculum for oncology, and recommend a focus year in the Netherlands for Digestive Oncology in the HGE-curriculum. To produce well-trained digestive oncologists, an advanced Digestive Oncology training program with specific qualifications in Digestive Oncology (2 years) has been developed. The schedule in Belgium includes a period of at least 6 mo to be spent in a medical oncology department. The goal of these programs remains the production of well-trained digestive oncologists. HGE specialists are part of the multidisciplinary oncological teams, and some have been administering chemotherapy in their countries for years. In this article, we provide a road map for the organization of a proper training in Digestive Oncology. We hope that the World Gastroenterology Organisation and other (inter)national societies will support the necessary certifications for this specific training in the HGE-curriculum. PMID:21556128

  14. Effects of active and passive training apparatus combined with rehabilitation training on lower limb function of stroke patients during recovery period

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    BACKGROUND: Stroke patients always spontaneously do some learning and training of motor functions;however, learning and training are not prompt and right, while patients do not have enough activity amounts.Active and passive motor training apparatus is aimed directly at lower limb training so as to stimulate nerve function through stimulating muscular movement. Based on motor mileage, motor time, various power supplies and velocity of active and passive training apparatus, we can understand the training condition and adjust training program.OBJECTIVE: To observe the effects of grade-III rehabilitation training combining with active and passive training apparatus on lower limb function, muscle strength and activity of daily living (ADL) in stroke patients during recovery period.DESIGN: Contrast observation.SETTING: Department of Rehabilitation, Jilin Academic Institute of Traditional Chinese Medicine.PARTICIPANTS: A total of 80 patients with stroke-induced hemiplegia after stabilizing vital signs for 2 weeks were selected from Department of Rehabilitation, Jilin Academic Institute of Traditional Chinese Medicine from January to June 2007. There were 47 males and 33 females, and their ages ranged from 41 to 75 years. All patients met the diagnostic criteria of the Fourth National Cerebrovascular Disease Academic Meeting in 1995 and were diagnosed as cerebral hemorrhage or cerebral infarction through CT or MRI examinations in clinic. Patients and their parents provided the confirmed consent. Based on therapeutic orders of hospitalization, patients were randomly divided into treatment group and control group with 40 patients in each group.METHODS: Patients in the control group received physical therapy and occupational therapy combining with rehabilitative treatment based on grade-Ⅲ rehabilitative treatment program, which was set by the National Cerebrovascular Disease Topic Group. In addition, patients in the treatment group were trained with active and passive

  15. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  16. A new approach for solving capacitated lot sizing and scheduling problem with sequence and period-dependent setup costs

    Directory of Open Access Journals (Sweden)

    Imen Chaieb Memmi

    2013-09-01

    Full Text Available Purpose: We aim to examine the capacitated multi-item lot sizing problem which is a typical example of a large bucket model, where many different items can be produced on the same machine in one time period. We propose a new approach to determine the production sequence and lot sizes that minimize the sum of start up and setup costs, inventory and production costs over all periods.Design/methodology/approach: The approach is composed of three steps. First, we compute a lower bound on total cost. Then we propose a three sub-steps iteration procedure. We solve optimally the lot sizing problem without considering products sequencing and their cost. Then, we determine products quantities to produce each period while minimizing the storage and variable production costs. Given the products to manufacture each period, we determine its correspondent optimal products sequencing, by using a Branch and Bound algorithm. Given the sequences of products within each period, we evaluate the total start up and setup cost. We compare then the total cost obtained to the lower bound of the total cost. If this value riches a prefixed value, we stop. Otherwise, we modify the results of lot sizing problem.Findings and Originality/value: We show using an illustrative example, that the difference between the total cost and its lower bound is only 10%. This gap depends on the significance of the inventory and production costs and the machine’s capacity. Comparing the approach we develop with a traditional one, we show that we manage to reduce the total cost by 30%.Research limitations/implications: Our model fits better to real-world situations where production systems run continuously. This model is applied for limited number of part types and periods.Practical implications: Our approach determines the products to manufacture each time period, their economic amounts, and their scheduling within each period. This outcome should help decision makers bearing expensive

  17. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  18. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  19. Soliton Trains Induced by Adaptive Shaping with Periodic Traps in Four-Level Ultracold Atom Systems

    International Nuclear Information System (INIS)

    Djouom Tchenkoue, M. L.; Welakuh Mbangheku, D.; Dikandé, Alain M.

    2017-01-01

    It is well known that an optical trap can be imprinted by a light field in an ultracold-atom system embedded in an optical cavity, and driven by three different coherent fields. Of the three fields coexisting in the optical cavity there is an intense control field that induces a giant Kerr nonlinearity via electromagnetically-induced transparency, and another field that creates a periodic optical grating of strength proportional to the square of the associated Rabi frequency. In this work elliptic-soliton solutions to the nonlinear equation governing the propagation of the probe field are considered, with emphasis on the possible generation of optical soliton trains forming a discrete spectrum with well defined quantum numbers. The problem is treated assuming two distinct types of periodic optical gratings and taking into account the negative and positive signs of detunings (detuning above or below resonance). Results predict that the competition between the self-phase and cross-phase modulation nonlinearities gives rise to a rich family of temporal soliton train modes characterized by distinct quantum numbers. (paper)

  20. Soliton Trains Induced by Adaptive Shaping with Periodic Traps in Four-Level Ultracold Atom Systems

    Science.gov (United States)

    Djouom Tchenkoue, M. L.; Welakuh Mbangheku, D.; Dikandé, Alain M.

    2017-06-01

    It is well known that an optical trap can be imprinted by a light field in an ultracold-atom system embedded in an optical cavity, and driven by three different coherent fields. Of the three fields coexisting in the optical cavity there is an intense control field that induces a giant Kerr nonlinearity via electromagnetically-induced transparency, and another field that creates a periodic optical grating of strength proportional to the square of the associated Rabi frequency. In this work elliptic-soliton solutions to the nonlinear equation governing the propagation of the probe field are considered, with emphasis on the possible generation of optical soliton trains forming a discrete spectrum with well defined quantum numbers. The problem is treated assuming two distinct types of periodic optical gratings and taking into account the negative and positive signs of detunings (detuning above or below resonance). Results predict that the competition between the self-phase and cross-phase modulation nonlinearities gives rise to a rich family of temporal soliton train modes characterized by distinct quantum numbers.

  1. 49 CFR 236.588 - Periodic test.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Periodic test. 236.588 Section 236.588..., Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.588 Periodic test. Except as provided in § 236.586, periodic test of the automatic train stop, train control, or cab signal apparatus...

  2. [Job status after the resident training period in Spain. Analysis of a national survey.

    Science.gov (United States)

    García Sanz, Miguel; Rodríguez Socarrás, Moises; Tortolero Blanco, Leonardo; Pesquera-Ortega, Laura; Colombo, Juan; Gómez Rivas, Juan

    2018-01-01

    Since the establishment of specialization of medicine through the residency system, Spanish health care has sought to maintain a balance between established needs and trained professionals, with the aim of avoiding the deficit or excess of health specialists with its consequences. The objective of the present review is to know the working conditions of urologist specialists at the end of the residency training period. The results of a survey for urologist who completed their residency contract from 2012 to 2016 are presented, assessing working status, academic and working data during the first months after the completion of specialized training. A total of 42 surveys were collected. All respondents had a working contract within 6 months of completing their training. 71% had a temporary contract, most with duration of less than one year. There are more contract numbers in the public health system, although they increase progressively in the private sector. More than half of the respondents were satisfied with their work situation. The work insertion of the recently specialized urologists is high, reaching 100% within 6 months of finishing their specialization. Labor quality issues are not so positive, observing great working instability associated to a high proportion of temporary contracts lower than 6 months.

  3. Application of coupled symbolic and numeric processing to an advanced scheduling system for plant construction

    International Nuclear Information System (INIS)

    Kobayashi, Yasuhiro; Takamoto, Masanori; Nonaka, Hisanori; Yamada, Naoyuki

    1994-01-01

    A scheduling system has been developed by integrating symbolic processing functions for constraint handling and modification guidance, with numeric processing functions for schedule optimization and evaluation. The system is composed of an automatic schedule generation module, interactive schedule revision module and schedule evaluation module. The goal of the problem solving is the flattening of the daily resources requirement throughout the scheduling period. The automatic schedule generation module optimizes the initial schedule according to the formulatable portion of requirement description specified in a predicate-like language. A planning engineer refines the near-goal schedule through a knowledge-based interactive optimization process to obtain the goal schedule which fully covers the requirement description, with the interactive schedule revision module and schedule evaluation module. A scheduling system has been implemented on the basis of the proposed problem solving framework and experimentally applied to real-world sized scheduling problems for plant construction. With a result of the overall plant construction scheduling, a section schedule optimization process is described with the emphasis on the symbolic processing functions. (author)

  4. Challenges encountered during an accelerated cogeneration plant construction and commissioning schedule

    International Nuclear Information System (INIS)

    Good, R.L.; Cox, T.P.; Vallejo, J.M.

    1988-01-01

    A decision was made in 1986 to proceed with a 110 magawatt grassroots cogeneration plant to supply the steam and electrical requirements of a large, integrated petrochemical manufacturing facility. Though some preliminary engineering had been done and long delivery equipment purchase orders had been let in the summer of 1986, detailed engineering did not commence until late October and construction until mid-December, 1986. Federal income tax consideration required that the project be in service prior to the end of 1987. This eleven month construction, commissioning, and start up schedule was achieved with 100 per cent operation occurring on December 22, 1987. Numerous challenges were met by the lean Project Team during this accelerated schedule. This paper discusses the development of: Project Team Staffing, Operator and Maintenance Staffing and Training, Commissioning Schedules and Staffing, solutions to Significant Technical Problems

  5. ENHANCED HYBRID PSO – ACO ALGORITHM FOR GRID SCHEDULING

    Directory of Open Access Journals (Sweden)

    P. Mathiyalagan

    2010-07-01

    Full Text Available Grid computing is a high performance computing environment to solve larger scale computational demands. Grid computing contains resource management, task scheduling, security problems, information management and so on. Task scheduling is a fundamental issue in achieving high performance in grid computing systems. A computational GRID is typically heterogeneous in the sense that it combines clusters of varying sizes, and different clusters typically contains processing elements with different level of performance. In this, heuristic approaches based on particle swarm optimization and ant colony optimization algorithms are adopted for solving task scheduling problems in grid environment. Particle Swarm Optimization (PSO is one of the latest evolutionary optimization techniques by nature. It has the better ability of global searching and has been successfully applied to many areas such as, neural network training etc. Due to the linear decreasing of inertia weight in PSO the convergence rate becomes faster, which leads to the minimal makespan time when used for scheduling. To make the convergence rate faster, the PSO algorithm is improved by modifying the inertia parameter, such that it produces better performance and gives an optimized result. The ACO algorithm is improved by modifying the pheromone updating rule. ACO algorithm is hybridized with PSO algorithm for efficient result and better convergence in PSO algorithm.

  6. Heuristic approach to train rescheduling

    Directory of Open Access Journals (Sweden)

    Mladenović Snežana

    2007-01-01

    Full Text Available Starting from the defined network topology and the timetable assigned beforehand, the paper considers a train rescheduling in respond to disturbances that have occurred. Assuming that the train trips are jobs, which require the elements of infrastructure - resources, it was done by the mapping of the initial problem into a special case of job shop scheduling problem. In order to solve the given problem, a constraint programming approach has been used. A support to fast finding "enough good" schedules is offered by original separation, bound and search heuristic algorithms. In addition, to improve the time performance, instead of the actual objective function with a large domain, a surrogate objective function is used with a smaller domain, if there is such. .

  7. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    Science.gov (United States)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  8. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  9. Investigations of timing during the schedule and reinforcement intervals with wheel-running reinforcement.

    Science.gov (United States)

    Belke, Terry W; Christie-Fougere, Melissa M

    2006-11-01

    Across two experiments, a peak procedure was used to assess the timing of the onset and offset of an opportunity to run as a reinforcer. The first experiment investigated the effect of reinforcer duration on temporal discrimination of the onset of the reinforcement interval. Three male Wistar rats were exposed to fixed-interval (FI) 30-s schedules of wheel-running reinforcement and the duration of the opportunity to run was varied across values of 15, 30, and 60s. Each session consisted of 50 reinforcers and 10 probe trials. Results showed that as reinforcer duration increased, the percentage of postreinforcement pauses longer than the 30-s schedule interval increased. On probe trials, peak response rates occurred near the time of reinforcer delivery and peak times varied with reinforcer duration. In a second experiment, seven female Long-Evans rats were exposed to FI 30-s schedules leading to 30-s opportunities to run. Timing of the onset and offset of the reinforcement period was assessed by probe trials during the schedule interval and during the reinforcement interval in separate conditions. The results provided evidence of timing of the onset, but not the offset of the wheel-running reinforcement period. Further research is required to assess if timing occurs during a wheel-running reinforcement period.

  10. Video Game Training and the Reward System

    Directory of Open Access Journals (Sweden)

    Robert C. Lorenz

    2015-02-01

    Full Text Available Video games contain elaborate reinforcement and reward schedules that have the potential to maximize motivation. Neuroimaging studies suggest that video games might have an influence on the reward system. However, it is not clear whether reward-related properties represent a precondition, which biases an individual towards playing video games, or if these changes are the result of playing video games. Therefore, we conducted a longitudinal study to explore reward-related functional predictors in relation to video gaming experience as well as functional changes in the brain in response to video game training.Fifty healthy participants were randomly assigned to a video game training (TG or control group (CG. Before and after training/control period, functional magnetic resonance imaging (fMRI was conducted using a non-video game related reward task.At pretest, both groups showed strongest activation in ventral striatum (VS during reward anticipation. At posttest, the TG showed very similar VS activity compared to pretest. In the CG, the VS activity was significantly attenuated.This longitudinal study revealed that video game training may preserve reward responsiveness in the ventral striatum in a retest situation over time. We suggest that video games are able to keep striatal responses to reward flexible, a mechanism which might be of critical value for applications such as therapeutic cognitive training.

  11. Video game training and the reward system

    Science.gov (United States)

    Lorenz, Robert C.; Gleich, Tobias; Gallinat, Jürgen; Kühn, Simone

    2015-01-01

    Video games contain elaborate reinforcement and reward schedules that have the potential to maximize motivation. Neuroimaging studies suggest that video games might have an influence on the reward system. However, it is not clear whether reward-related properties represent a precondition, which biases an individual toward playing video games, or if these changes are the result of playing video games. Therefore, we conducted a longitudinal study to explore reward-related functional predictors in relation to video gaming experience as well as functional changes in the brain in response to video game training. Fifty healthy participants were randomly assigned to a video game training (TG) or control group (CG). Before and after training/control period, functional magnetic resonance imaging (fMRI) was conducted using a non-video game related reward task. At pretest, both groups showed strongest activation in ventral striatum (VS) during reward anticipation. At posttest, the TG showed very similar VS activity compared to pretest. In the CG, the VS activity was significantly attenuated. This longitudinal study revealed that video game training may preserve reward responsiveness in the VS in a retest situation over time. We suggest that video games are able to keep striatal responses to reward flexible, a mechanism which might be of critical value for applications such as therapeutic cognitive training. PMID:25698962

  12. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  13. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  14. The Importance of Muscular Strength: Training Considerations.

    Science.gov (United States)

    Suchomel, Timothy J; Nimphius, Sophia; Bellon, Christopher R; Stone, Michael H

    2018-04-01

    This review covers underlying physiological characteristics and training considerations that may affect muscular strength including improving maximal force expression and time-limited force expression. Strength is underpinned by a combination of morphological and neural factors including muscle cross-sectional area and architecture, musculotendinous stiffness, motor unit recruitment, rate coding, motor unit synchronization, and neuromuscular inhibition. Although single- and multi-targeted block periodization models may produce the greatest strength-power benefits, concepts within each model must be considered within the limitations of the sport, athletes, and schedules. Bilateral training, eccentric training and accentuated eccentric loading, and variable resistance training may produce the greatest comprehensive strength adaptations. Bodyweight exercise, isolation exercises, plyometric exercise, unilateral exercise, and kettlebell training may be limited in their potential to improve maximal strength but are still relevant to strength development by challenging time-limited force expression and differentially challenging motor demands. Training to failure may not be necessary to improve maximum muscular strength and is likely not necessary for maximum gains in strength. Indeed, programming that combines heavy and light loads may improve strength and underpin other strength-power characteristics. Multiple sets appear to produce superior training benefits compared to single sets; however, an athlete's training status and the dose-response relationship must be considered. While 2- to 5-min interset rest intervals may produce the greatest strength-power benefits, rest interval length may vary based an athlete's training age, fiber type, and genetics. Weaker athletes should focus on developing strength before emphasizing power-type training. Stronger athletes may begin to emphasize power-type training while maintaining/improving their strength. Future research should

  15. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  16. Accommodating adolescent sleep-wake patterns: the effects of shifting the timing of sleep on training effectiveness.

    Science.gov (United States)

    Miller, Nita Lewis; Tvaryanas, Anthony P; Shattuck, Lawrence G

    2012-08-01

    This study evaluated the effect of accommodating adolescent sleep-wake patterns by altering the timing of the major sleep period of US Army recruits. The quasi-experimental study compared recruits assigned to one of two training companies: one with a customary sleep regimen (20:30 to 04:30) while the other employed a phase-delayed sleep regimen (23:00 to 07:00), the latter aligning better with biologically driven sleep-wake patterns of adolescents. The study was conducted during Basic Combat Training (BCT) at Fort Leonard Wood, Missouri. TRAINEES: The study included 392 trainees: 209 received the intervention, while 183 composed the Comparison group. Demographic and psychophysiological measures were collected on all trainees. Weekly assessments of subjective fatigue and mood, periodic physical fitness, marksmanship scores, and attrition rates from BCT were studied. Actigraphy was collected on approximately 24% of trainees. Based on actigraphy, trainees on the phase-delayed sleep schedule obtained 31 m more sleep/night than trainees on the customary sleep schedule. The Intervention group reported less total mood disturbance relative to baseline. Improvements in marksmanship correlated positively with average nightly sleep during the preceding week when basic marksmanship skills were taught. No differences were seen in physical fitness or attrition rates. In contrast to the Intervention group, the Comparison group was 2.3 times more likely to experience occupationally significant fatigue and 5.5 times more likely to report poor sleep quality. Accommodating adolescent sleep patterns significantly improves mental health and performance in the training environment.

  17. An interpretation of schedule 1 of the Radioactive Substances Act 1993 and related issues

    International Nuclear Information System (INIS)

    Hill, M.; Wakerley, M.W.

    2000-09-01

    Schedule 1 of the UK's Radioactive Substances Act 1993 was originally Schedule 3 of the 1960 Act of the same name. It is possible that different methods are currently being employed to interpret how Schedule 1 should be used. This report provides an interpretation and guidance on this and related issues. It is primarily for technical specialists already familiar with the workings of the Act. This report covers the period 1999/2000

  18. ANALYSIS OF TRAIN SHEET IN THE INFORMATION SYSTEM OF JSC «UKRZALIZNYTSIA»: PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    S. M. Ovcharenko

    2016-04-01

    Full Text Available Purpose. The system of train sheet analysis (TSA in the information system of JSC «Ukrzaliznytsia» provides work with passenger and suburban trains and has considerable potential. Therefore it is necessary to establish the prospects of development of the system. Methodology. Departments’ setup and the train delay causes should be carried out at every station and span, where such delays took place. This requires the fixation of condition deviations of infrastructure from normal and other adverse factors. In the sector of freight transportations the train schedule analysis is insufficient, since this analysis does not account for deviations from the terms of delivery. Therefore it also is necessary to analyze the delivery graphs. The basis for monitoring the cargo delivery is the method of control time points (CTP of technological operations performed with cargo at railway stations. On the basis of CTP to assess the quality of the transport process one should calculate the values of the analysis of cargo delivery schedule (performance level of the cargo delivery schedule, the coefficient of ahead of schedule/delay delivery. Findings. The article proposes to develop the system TSA using the input and display of the train delay causes on-line by transportation service employees, expansion of statistical databases and processing of the input delay causes during its calculation train sheet analysis of freight trains and quality assessment of the delivery schedule fulfillment. It is also appropriate before the new operator companies had appeared to make changes in the instructions TSCHU-TSD-0002 on the list of departments, which include delayed trains, by adding «the department» «The fault of operator companies» and corresponding causes of delays. Originality. The scheme of automated TSA in the information system of JSC «Ukrzaliznytsia» was improved. The author proposes to determine the cargo delivery quality on the certain polygon using the

  19. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  20. Techniques for establishing schedules with wheel running as reinforcement in rats.

    Science.gov (United States)

    Iversen, I H

    1993-07-01

    In three experiments, access to wheel running was contingent on lever pressing. In each experiment, the duration of access to running was reduced gradually to 4, 5, or 6 s, and the schedule parameters were expanded gradually. The sessions lasted 2 hr. In Experiment 1, a fixed-ratio 20 schedule controlled a typical break-and-run pattern of lever pressing that was maintained throughout the session for 3 rats. In Experiment 2, a fixed-interval schedule of 6 min maintained lever pressing throughout the session for 3 rats, and for 1 rat, the rate of lever pressing was positively accelerated between reinforcements. In Experiment 3, a variable-ratio schedule of 20 or 35 was in effect and maintained lever pressing at a very stable pace throughout the session for 2 of 3 rats; for 1 rat, lever pressing was maintained at an irregular rate. When the session duration was extended to successive 24-hr periods, with food and water accessible in Experiment 3, lever pressing settled into a periodic pattern occurring at a high rate at approximately the same time each day. In each experiment, the rats that developed the highest local rates of running during wheel access also maintained the most stable and highest rates of lever pressing.

  1. Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.

    Science.gov (United States)

    Westgard, James O; Bayat, Hassan; Westgard, Sten A

    2018-02-01

    To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.

  2. Using Improved Ant Colony Algorithm to Investigate EMU Circulation Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yu Zhou

    2014-01-01

    Full Text Available High-speed railway is one of the most important ways to solve the long-standing travel difficulty problem in China. However, due to the high acquisition and maintenance cost, it is impossible for decision-making departments to purchase enough EMUs to satisfy the explosive travel demand. Therefore, there is an urgent need to study how to utilize EMU more efficiently and reduce costs in the case of completing a given task in train diagram. In this paper, an EMU circulation scheduling model is built based on train diagram constraints, maintenance constraints, and so forth; in the model solving process, an improved ACA algorithm has been designed. A case study is conducted to verify the feasibility of the model. Moreover, contrast tests have been carried out to compare the efficiency between the improved ACA and the traditional approaches. The results reveal that improved ACA method can solve the model with less time and the quality of each representative index is much better, which means that efficiency of the improved ACA method is higher and better scheduling scheme can be obtained.

  3. Energy Assurance Technical Training and Awareness Program/Energy Infrastructure Training and Analysis Center

    Energy Technology Data Exchange (ETDEWEB)

    Barbara McCabe

    2005-11-15

    This report covers the work completed during Year One (Year One has a 16 month project period) of a five- year Cooperative Agreement (DE-FC26-03NT41895) between the International Union of Operating Engineers (IUOE) National Hazmat Program (OENHP) and the U. S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). This final technical report is being submitted, as required by the Cooperative Agreement, within 90 (calendar) days after the project period ends (December 31, 2004). The resources allocated to Year One of the Cooperative Agreement were adequate for the completion of the required deliverables. All deliverables have been completed and sent to AAD Document Control as directed in the cooperative agreement. The allocation for Year One required 20-25 trainers to be trained in each of five Train-the-Trainer courses and a total of 6,000 workers trained throughout the country. Through cost savings employed for the scheduling and conduct of Train-the-Trainer, instructor refreshers, and direct training classes, 3171 workers have been trained to date. This total incorporates 159 trainers and members from management, local, county, state and federal organizations identified in the Strategic Plan. The largest percentage of personnel trained is heavy equipment operators, and building engineers, which is the largest targeted population identified under this cooperative agreement. The OENHP, using existing curriculum as appropriate, has modified and developed new training modules that have been used to establish four different levels of training courses. The four courses are: (1) EA 500 Energy Assurance Train-the-Trainer, (2) EA 400 Energy Assurance Instructor Refresher, (3) EA 300 Energy Assurance, and (4) EA 100 Energy Assurance Awareness. Training modules cover topics, such as, but not limited to, facility vulnerability and vulnerability assessment, physical security- heating, ventilation, air conditioning, terrorism awareness, weapons of mass

  4. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  5. 18 CFR 154.313 - Schedules for minor rate changes.

    Science.gov (United States)

    2010-04-01

    ... of the End of the Test Period. (7) Schedule E. Working Capital. Show the various components provided.... Depreciation, Depletion, Amortization and Negative Salvage Expenses. Show, separately, the gas plant depreciation, depletion, amortization, and negative salvage expenses by functional classifications. For each...

  6. The Train Driver Recovery Problem - a Set Partitioning Based Model and Solution Method

    DEFF Research Database (Denmark)

    Rezanova, Natalia Jurjevna; Ryan, David

    The need to recover a train driver schedule occurs during major disruptions in the daily railway operations. Using data from the train driver schedule of the Danish passenger railway operator DSB S-tog A/S, a solution method to the Train Driver Recovery Problem (TDRP) is developed. The TDRP...... the depth-first search of the Branch & Bound tree. Preliminarily results are encouraging, showing that nearly all tested real-life instances produce integer solutions to the LP relaxation and solutions are found within a few seconds....

  7. Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan

    National Research Council Canada - National Science Library

    York, Michael A

    2008-01-01

    .... This capability is developed through the Fleet Readiness Training Plan (FRTP) where the Navy's carriers are scheduled in staggered 32-month cycles consisting of four phases of progressive readiness levels...

  8. Freight railway operator timetabling and engine scheduling

    DEFF Research Database (Denmark)

    Bach, Lukas; Gendreau, M.; Wøhlk, Sanne

    2015-01-01

    In this paper we consider timetable design at a European freight railway operator. The timetable is designed by choosing the time of service for customer unit train demands among a set of discrete points. These discrete points are all found within the a time-window. The objective of the model...... is to minimize cost while adhering to constraints regarding infrastructure usage, demand coverage, and engine availability. The model is solved by a column generation scheme where feasible engine schedules are designed in a label setting algorithm with time-dependent cost and service times....

  9. Case study: Accelerated schedule for MULTI LIMS installation

    International Nuclear Information System (INIS)

    Ibsen, T.G.

    1994-05-01

    This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff

  10. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  11. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  12. Effect of A 16 Week Combined Strength and Plyometric Training Program Followed by A Detraining Period on Athletic Performance in Pubertal Volleyball Players.

    Science.gov (United States)

    Fathi, Abed; Hammami, Raouf; Moran, Jason; Borji, Rihab; Sahli, Sonia; Rebai, Haithem

    2018-02-01

    The purpose of this study was to determine the effects of 16 weeks of combined strength and plyometric training or plyometric training alone, and how a detraining program can modify adaptations in response to the training stimulus. Sixty male volleyball players (circa PHV:-1 to +1 years from PHV) were assigned to a Combined Training group (CTG) (n=20), a Plyometric Training group (PTG) (n=20) or a control group (CG) (n=20). The experimental groups (CTG and PTG) participated in training twice weekly for 16 weeks. Thigh muscle volume, body fat, flexibility, sprint, jump height and medicine ball throw were measured at pre-training, post-training and detraining. Respectively, the CTG and PTG showed increases in thigh muscle volume (Effect size: 0.71 and 0.42), and decreases in body fat (-0.42 and -0.34) as well as improvements in 5 m sprint (-0.69 and -0.46) 10 m sprint (-0.31 and -0.3), lower body muscle power (0.44 and 0.36) and upper body muscle power (1.32 and 0.7). After the detraining period, all groups maintained previously attained muscle power (6.79% to 9.87%; pplyometric training provided better improvements than plyometric training only. The combination of strength and plyometric training is a time-effective training modality that confers improvements in physical performance measures, muscle size and body fat. A temporary period of detraining may not undermine performance gains in pubertal volleyball players.

  13. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  14. Train shunting at a workshop area

    DEFF Research Database (Denmark)

    Jacobsen, Per Munk; Pisinger, David

    2011-01-01

    We consider the problem of planning the shunting of train units at a railway workshop area. Before and after the maintenance check, a train unit is parked at a depository track. The problem is to schedule the trains to workshops and depot tracks in order to complete the repairs as soon as possibl....... It turns out, that both GLS and SA find within a few minutes solutions that are a few percent from the best MIP solution found....

  15. Comparison of genetic algorithm and harmony search for generator maintenance scheduling

    International Nuclear Information System (INIS)

    Khan, L.; Mumtaz, S.; Khattak, A.

    2012-01-01

    GMS (Generator Maintenance Scheduling) ranks very high in decision making of power generation management. Generators maintenance schedule decides the time period of maintenance tasks and a reliable reserve margin is also maintained during this time period. In this paper, a comparison of GA (Genetic Algorithm) and US (Harmony Search) algorithm is presented to solve generators maintenance scheduling problem for WAPDA (Water And Power Development Authority) Pakistan. GA is a search procedure, which is used in search problems to compute exact and optimized solution. GA is considered as global search heuristic technique. HS algorithm is quite efficient, because the convergence rate of this algorithm is very fast. HS algorithm is based on the concept of music improvisation process of searching for a perfect state of harmony. The two algorithms generate feasible and optimal solutions and overcome the limitations of the conventional methods including extensive computational effort, which increases exponentially as the size of the problem increases. The proposed methods are tested, validated and compared on the WAPDA electric system. (author)

  16. Taking the lag out of jet lag through model-based schedule design.

    Science.gov (United States)

    Dean, Dennis A; Forger, Daniel B; Klerman, Elizabeth B

    2009-06-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  17. Relationships between Classroom Schedule Types and Performance on the Algebra I Criterion-Referenced Test

    Science.gov (United States)

    Murray, Gregory V.; Moyer-Packenham, Patricia S.

    2014-01-01

    One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…

  18. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    Science.gov (United States)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  19. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  20. An evaluation of multiple-schedule variations to reduce high-rate requests in the picture exchange communication system.

    Science.gov (United States)

    Landa, Robin; Hanley, Gregory P

    2016-06-01

    Using procedures similar to those of Tiger, Hanley, and Heal (2006), we compared two multiple-schedule variations (S+/S- and S+ only) to treat high-rate requests for edible items in the Picture Exchange Communication System (PECS). Two individuals with autism participated, after they showed persistent requests for edible items after PECS training. Stimulus control was achieved only with the multiple schedule that involved presentation of a discriminative stimulus during reinforcement components and its removal during extinction components (S+ only). Discriminated requests were maintained for the 1 participant who experienced schedule thinning. © 2016 Society for the Experimental Analysis of Behavior.

  1. Simulated Stochastic Approximation Annealing for Global Optimization With a Square-Root Cooling Schedule

    KAUST Repository

    Liang, Faming

    2014-04-03

    Simulated annealing has been widely used in the solution of optimization problems. As known by many researchers, the global optima cannot be guaranteed to be located by simulated annealing unless a logarithmic cooling schedule is used. However, the logarithmic cooling schedule is so slow that no one can afford to use this much CPU time. This article proposes a new stochastic optimization algorithm, the so-called simulated stochastic approximation annealing algorithm, which is a combination of simulated annealing and the stochastic approximation Monte Carlo algorithm. Under the framework of stochastic approximation, it is shown that the new algorithm can work with a cooling schedule in which the temperature can decrease much faster than in the logarithmic cooling schedule, for example, a square-root cooling schedule, while guaranteeing the global optima to be reached when the temperature tends to zero. The new algorithm has been tested on a few benchmark optimization problems, including feed-forward neural network training and protein-folding. The numerical results indicate that the new algorithm can significantly outperform simulated annealing and other competitors. Supplementary materials for this article are available online.

  2. ATD-2 Surface Scheduling and Metering Concept

    Science.gov (United States)

    Coppenbarger, Richard A.; Jung, Yoon Chul; Capps, Richard Alan; Engelland, Shawn A.

    2017-01-01

    This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

  3. Training at Electricite de France

    International Nuclear Information System (INIS)

    Rippon, S.

    1985-01-01

    With 41 nuclear power units operating and another 21 units under construction, France is serious about improving personnel training for the 3000 new employees each year. Electricite de France (EdF) takes a paternalistic approach to personnel training and to recruitment and advancement from within the organization. Courses in the training program range from one day to one year in length, and may take place either on or off the site. The author describes the training centers and schedule, but emphasizes the training is an ongoing process. Most instructors come from operating power stations. The courses use simulators to train operators in the use of fault analysis during an emergency. Computer-aided teaching systems are also widely used. 1 figure

  4. Different MK-801 administration schedules induce mild to severe learning impairments in an operant conditioning task: role of buspirone and risperidone in ameliorating these cognitive deficits.

    Science.gov (United States)

    Rapanelli, Maximiliano; Frick, Luciana Romina; Bernardez-Vidal, Micaela; Zanutto, Bonifacio Silvano

    2013-11-15

    Blockade of N-methyl-d-aspartate receptor (NMDA) by the noncompetitive NMDA receptor (NMDAR) antagonist MK-801 produces behavioral abnormalities and alterations in prefrontal cortex (PFC) functioning. Due to the critical role of the PFC in operant conditioning task learning, we evaluated the effects of acute, repeated postnatal injections of MK-801 (0.1mg/kg) on learning performance. We injected Long-Evans rats i.p. with MK-801 (0.1mg/kg) using three different administration schedules: injection 40 min before beginning the task (during) (n=12); injection twice daily for six consecutive days prior to beginning the experimental procedures (prior) (n=12); or twice daily subcutaneous injections from postnatal day 7 to 11 (postnatal) (n=12). Next, we orally administered risperidone (serotonin receptor 2A and dopamine receptor 2 antagonist, 1mg/kg) or buspirone (serotonin receptor 1A partial agonist, 10mg/kg) to animals treated with the MK-801 schedule described above. The postnatal and prior administration schedules produced severe learning deficits, whereas injection of MK-801 just before training sessions had only mild effects on acquisition of an operant conditioning. Risperidone was able to reverse the detrimental effect of MK-801 in the animals that were treated with MK-801 during and prior training sessions. In contrast, buspirone was only effective at mitigating the cognitive deficits induced by MK-801 when administered during the training procedures. The data demonstrates that NMDA antagonism disrupts basic mechanisms of learning in a simple PFC-mediated operant conditioning task, and that buspirone and risperidone failed to attenuate the learning deficits when NMDA neurotransmission was blocked in the early stages of the postnatal period. Copyright © 2013 Elsevier B.V. All rights reserved.

  5. 5 CFR 610.121 - Establishment of work schedules.

    Science.gov (United States)

    2010-01-01

    ... out its functions or that costs would be substantially increased, he or she shall provide that— (1) Assignments to tours of duty are scheduled in advance of the administrative workweek over periods of not less... employee's actual work requirements. (2) When the head of an agency knows in advance of an administrative...

  6. Sleep inertia during a simulated 6-h on/6-h off fixed split duty schedule.

    Science.gov (United States)

    Hilditch, Cassie J; Short, Michelle; Van Dongen, Hans P A; Centofanti, Stephanie A; Dorrian, Jillian; Kohler, Mark; Banks, Siobhan

    Sleep inertia is a safety concern for shift workers returning to work soon after waking up. Split duty schedules offer an alternative to longer shift periods, but introduce additional wake-ups and may therefore increase risk of sleep inertia. This study investigated sleep inertia across a split duty schedule. Sixteen participants (age range 21-36 years; 10 females) participated in a 9-day laboratory study with two baseline nights (10 h time in bed, [TIB]), four 24-h periods of a 6-h on/6-h off split duty schedule (5-h TIB in off period; 10-h TIB per 24 h) and two recovery nights. Two complementary rosters were evaluated, with the timing of sleep and wake alternating between the two rosters (2 am/2 pm wake-up roster versus 8 am/8 pm wake-up roster). At 2, 17, 32 and 47 min after scheduled awakening, participants completed an 8-min inertia test bout, which included a 3-min psychomotor vigilance test (PVT-B), a 3-min Digit-Symbol Substitution Task (DSST), the Karolinska Sleepiness Scale (KSS), and the Samn-Perelli Fatigue Scale (SP-Fatigue). Further testing occurred every 2 h during scheduled wakefulness. Performance was consistently degraded and subjective sleepiness/fatigue was consistently increased during the inertia testing period as compared to other testing times. Morning wake-ups (2 am and 8 am) were associated with higher levels of sleep inertia than later wake-ups (2 pm and 8 pm). These results suggest that split duty workers should recognise the potential for sleep inertia after waking, especially during the morning hours.

  7. Training Modalities to Increase Sensorimotor Adaptability

    Science.gov (United States)

    Bloomberg, J. J.; Mulavara, A. P.; Peters, B. T.; Brady, R.; Audas, C.; Cohen, H. S.

    2009-01-01

    During the acute phase of adaptation to novel gravitational environments, sensorimotor disturbances have the potential to disrupt the ability of astronauts to perform required mission tasks. The goal of our current series of studies is develop a sensorimotor adaptability (SA) training program designed to facilitate recovery of functional capabilities when astronauts transition to different gravitational environments. The project has conducted a series of studies investigating the efficacy of treadmill training combined with a variety of sensory challenges (incongruent visual input, support surface instability) designed to increase adaptability. SA training using a treadmill combined with exposure to altered visual input was effective in producing increased adaptability in a more complex over-ground ambulatory task on an obstacle course. This confirms that for a complex task like walking, treadmill training contains enough of the critical features of overground walking to be an effective training modality. SA training can be optimized by using a periodized training schedule. Test sessions that each contain short-duration exposures to multiple perturbation stimuli allows subjects to acquire a greater ability to rapidly reorganize appropriate response strategies when encountering a novel sensory environment. Using a treadmill mounted on top of a six degree-of-freedom motion base platform we investigated locomotor training responses produced by subjects introduced to a dynamic walking surface combined with alterations in visual flow. Subjects who received this training had improved locomotor performance and faster reaction times when exposed to the novel sensory stimuli compared to control subjects. Results also demonstrate that individual sensory biases (i.e. increased visual dependency) can predict adaptive responses to novel sensory environments suggesting that individual training prescription can be developed to enhance adaptability. These data indicate that SA

  8. Perception of Music and Speech in Adolescents with Cochlear Implants – A Pilot Study on Effects of Intensive Musical Ear Training

    DEFF Research Database (Denmark)

    Petersen, Bjørn; Sørensen, Stine Derdau; Pedersen, Ellen Raben

    measures of rehabilitation are important throughout adolescence. Music training may provide a beneficial method of strengthening not only music perception, but also linguistic skills, particularly prosody. The purpose of this study was to examine perception of music and speech and music engagement...... of adolescent CI users and the potential effects of an intensive musical ear training program. METHODS Eleven adolescent CI users participated in a short intensive training program involving music making activities and computer based listening exercises. Ten NH agemates formed a reference group, who followed...... their standard school schedule and received no music training. Before and after the intervention period, both groups completed a set of tests for perception of music, speech and emotional prosody. In addition, the participants filled out a questionnaire which examined music listening habits and enjoyment...

  9. An intensive combined training program modulates physical, physiological, biomotoric, and technical parameters in women basketball players.

    Science.gov (United States)

    Kilinç, Fatih

    2008-11-01

    The purpose of this study was the investigation of the effects of an intensive combined training program based on the pretest scores of a university women's basketball team on their physical, physiological, biomotoric, and technical features. Twenty-four university volunteers were equally divided into two groups: an experiment group (intensive combined training group) and a control (technical training) group. The 10-week intensive combined training program was performed on the experiment group according to their pretest outcomes. Before and at the end of each period of training, which was scheduled four times a week, the physical, physiological, biomotoric, and technical performance of each subject were determined. With respect to the pre- and posttest measurements, the basketball group showed significant differences (p training program performed on university women basketball players had a significant effect on improving their physical, physiological, biomotoric, and technical features. It proved to be highly recommendable for female basketball players who are preparing for short-term tournaments; the basketball group in this study won a championship.

  10. Effects of stress and corticosterone in two post-training periods, on spatial memory consolidation in adult male Wistar rats.

    Directory of Open Access Journals (Sweden)

    Jeimmy Marcela Cerón

    2015-04-01

    Full Text Available Memory consolidation is the process of gradual stabilization of long-term memory after learning (Alberini & Taubenfeld, 2008. This process involves the activation of intracellular signaling cascades that lead to the reorganization of synaptic proteins. Activation of these signaling pathways can regulate gene expression and protein synthesis (Brivanlou & Darnell, 2002. It is considered that the new proteins synthesized after learning are responsible for the changes in the neural architecture associated with memory consolidation (Mileusnic, 2004. In this sense, it has been shown that consolidation may be interrupted by inhibiting protein synthesis, leading to forgetfulness of the experience (Meeter & Murre, 2004. Although the dominant hypothesis is that memory consolidation requires a single molecular cascade, it has been suggested that multiple sets of synaptic modifications are required to reinforce changes after memory acquisition (Wittenber & Tsien, 2002. Consistently, recent studies have shown that protein synthesis associated with memory consolidation occurs in at least two post-training periods: immediately and 3-6 hours after training (Igaz et al., 2002; Bekinschtein et al., 2007. These memory consolidation periods share some molecular phenomena; however, each period is also associated with events that are different from the other (Igaz et al., 2002. To date, there is a substantial amount of evidence showing that stressful events may facilitate neuronal function and cognition. The term "stress" usually refers to a nonspecific response of the body to stimuli that threaten the physiological/psychological homeostasis (Selye, 1976; Chrousos et al., 1988. The stress response is associated with the activation of two physiological systems: the hypothalamic-pituitary-adrenal (HPA axis and the sympathetic adrenomedullary (SAM. Glucocorticoids (cortisol in humans and corticosterone in rodents are steroid hormones secreted by the adrenal glands as a

  11. Checklist for Staff Technology Training.

    Science.gov (United States)

    Anderson, Mary Alice

    1997-01-01

    Presents a planning checklist for staff technology training. Includes forming a committee and developing proposals, contacting pertinent people, handling publicity, sending invitations, distributing schedules/registration information, arranging for equipment, purchasing prizes, conducting preliminary checks on equipment and software, ordering…

  12. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  13. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  14. Taking the lag out of jet lag through model-based schedule design.

    Directory of Open Access Journals (Sweden)

    Dennis A Dean

    2009-06-01

    Full Text Available Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  15. 21 CFR 1314.35 - Training of sales personnel.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Training of sales personnel. 1314.35 Section 1314.35 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL PRODUCTS Sales by Regulated Sellers § 1314.35 Training of sales personnel. Each regulated...

  16. THE EFFECTS OF INCOME, GENDER, AGE, EDUCATION, WORKING PERIOD, INSURANCE, TRAINING, AND WORKER STATUS ON OUTSOURCED AND WORKERS PERFORMANCE IN SOUTH SUMATERA IN MANUFACTURING COMPANIES

    Directory of Open Access Journals (Sweden)

    Ratna Juwita

    2017-06-01

    Full Text Available This research investigated the effects of income, gender, age, education, working period, insurance, training and workers’ status (outsourcing or permanent on performance. The result showed that gender, education, insurance, training and status had positive and significant effect on performace. Income had significant and negative effect on performance, the increased income would decrease performance. Age had positive but not significant effect, the increased age would decrease performance. Working period had negative but not significsnt effect on performance, the short working period would decrease performance.

  17. An on-line modified least-mean-square algorithm for training neurofuzzy controllers.

    Science.gov (United States)

    Tan, Woei Wan

    2007-04-01

    The problem hindering the use of data-driven modelling methods for training controllers on-line is the lack of control over the amount by which the plant is excited. As the operating schedule determines the information available on-line, the knowledge of the process may degrade if the setpoint remains constant for an extended period. This paper proposes an identification algorithm that alleviates "learning interference" by incorporating fuzzy theory into the normalized least-mean-square update rule. The ability of the proposed methodology to achieve faster learning is examined by employing the algorithm to train a neurofuzzy feedforward controller for controlling a liquid level process. Since the proposed identification strategy has similarities with the normalized least-mean-square update rule and the recursive least-square estimator, the on-line learning rates of these algorithms are also compared.

  18. Controlled Manipulation with a Bose–Einstein Condensates N-Soliton Train under the Influence of Harmonic and Tilted Periodic Potentials

    International Nuclear Information System (INIS)

    Feng-De, Zong; Jie-Fang, Zhang

    2008-01-01

    A model of the perturbed complex Toda chain (PCTC) to describe the dynamics of a Bose–Einstein condensate (BEC) N-soliton train trapped in an applied combined external potential consisting of both a weak harmonic and tilted periodic component is first developed. Using the developed theory, the BEC N-soliton train dynamics is shown to be well approximated by 4N coupled nonlinear differential equations, which describe the fundamental interactions in the system arising from the interplay of amplitude, velocity, centre-of-mass position, and phase. The simplified analytic theory allows for an efficient and convenient method for characterizing the BEC N-soliton train behaviour. It further gives the critical values of the strength of the potential for which one or more localized states can be extracted from a soliton train and demonstrates that the BEC N-soliton train can move selectively from one lattice site to another by simply manipulating the strength of the potential. (general)

  19. Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.

    Science.gov (United States)

    Pérez-Padilla, Angeles; Pellón, Ricardo

    2003-05-01

    d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.

  20. Adapting immunisation schedules for children undergoing chemotherapy.

    Science.gov (United States)

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  1. Prioritizing sleep for healthy work schedules

    OpenAIRE

    Takahashi Masaya

    2012-01-01

    Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amoun...

  2. Perception of Music and Speech in Adolescents with Cochlear Implants – A Pilot Study on Effects of Intensive Musical Ear Training

    DEFF Research Database (Denmark)

    Petersen, Bjørn; Sørensen, Stine Derdau; Pedersen, Ellen Raben

    their standard school schedule and received no music training. Before and after the intervention period, both groups completed a set of tests for perception of music, speech and emotional prosody. In addition, the participants filled out a questionnaire which examined music listening habits and enjoyment....... RESULTS CI users significantly improved their overall music perception and discrimination of melodic contour and rhythm in particular. No effect of the music training was found on discrimination of emotional prosody or speech. The CI users described levels of music engagement and enjoyment that were...... combined with their positive feedback suggests that music training could form part of future rehabilitation programs as a strong, motivational and beneficial method of improving auditory skills in adolescent CI users....

  3. Shift scheduling limits for the nuclear industry NRC policy and recommendations

    International Nuclear Information System (INIS)

    Koontz, J.; Morisseau, D.; Lewis, P.

    1985-01-01

    A study on shift scheduling and use of overtime and their effects on human performance in nuclear and non-nuclear industries was conducted. An analysis of the literature, current practices, and federal policy on shift scheduling resulted in human factors recommendations for limiting hours of work in the nuclear industry for nuclear power plant personnel conducting safety related functions. Recommended limits on total hours of work were developed by a panel of experts for both 8-hour and 12-hour daily shift schedules for weekly, biweekly, monthly, and annual work periods. The study results are particularly applicable to control room operators but should also be considered for other personnel where performance degradation due to fatigue could directly affect safe plant operations

  4. Using Variable Interval Reinforcement Schedules to Support Students in the Classroom: An Introduction with Illustrative Examples

    Science.gov (United States)

    Hulac, David; Benson, Nicholas; Nesmith, Matthew C.; Wollersheim Shervey, Sarah

    2016-01-01

    When behaviors are reinforced with a variable interval reinforcement schedule, reinforcement is available only after an unknown period of time. These types of reinforcement schedules are most useful for reinforcing slow and steady responding and for differentially reinforcing behaviors that are incompatible with some problematic behaviors. This…

  5. Sistemas de tutoramento e épocas de transplante de physalis Periods replanting and training systems of cape-gooseberry

    Directory of Open Access Journals (Sweden)

    Cláudia Simone Madruga Lima

    2010-12-01

    Full Text Available A physalis (Physalis peruviana é uma pequena fruta com grandes potencialidades, que, associadas ao seu ciclo curto e às propriedades nutracêuticas, apresenta possibilidade de alto retorno econômico. O objetivo deste trabalho foi avaliar o sistema de tutoramento e a época de transplante mais adequados para o crescimento e a produção de frutos de P. peruviana nas condições edafoclimáticas do sul do Rio Grande do Sul. O trabalho foi desenvolvido em Pelotas, RS, na safra de 2007/2008. O transplante de mudas de physalis foi realizado em duas épocas (época 1, 21/11/2007 e época 2 15/01/2008, sendo as plantas tutoradas em quatro sistemas de condução (sistema "V" invertido, sistema triangular, sistema vertical com bambu e sistema vertical com fitilho, semelhantes aos utilizados na cultura do tomateiro. O delineamento experimental adotado foi de blocos casualizados, com três repetições, sendo cada um representado por dez plantas. Os tratamentos formaram um fatorial 2x4 (épocas de transplante x sistemas de tutoramento. As variáveis analisadas foram: incremento do comprimento e da área da seção do ramo principal, área da seção do ramo principal, produtividade e eficiência produtiva. Foi evidenciado que a primeira época de transplante associada aos sistemas de tutoramento "V" invertido e triangular proporciona melhor desempenho agronômico das plantas de physalis.The cape-gooseberry (Physalis peruviana is a small fruit with great potentialities that whether associated to its short cycle and nutraceutical properties it shows high economical return. The work aimed to evaluate the best training system and replant period to plant growth, production and fruit quality of P. peruviana under edaphoclimatic at conditions of southern Rio Grande do Sul. The trial was carried out in Pelotas, RS, in 2007/2008 crop. Transplanting seedlings cape-gooseberry was conducted in two seasons Plant replanting was done in two periods (period 1, 21

  6. Training of radwaste management specialists

    International Nuclear Information System (INIS)

    Lifanova, S.D.

    2010-01-01

    Highly professional and knowledgeable employees for chemical, and especially radiochemical, technology companies are very much sought after these days. Taking into account the advancement of nuclear power and the associated expansion of radioactive waste management facilities, the demand for staff that possesses all the necessary knowledge is set to increase multi-tenfold. In such circumstances, training of personnel is becoming a key element of the human resource management process. The author says that training of personnel at SUE SIA Radon Moscow is conducted in accordance with the Program of Training, Advanced Training and Personnel Qualification, which prescribes areas of training, categories of trainees, approximate number of trainees for each area, schedule and budget of training sessions. The cooperation of SUE SIA Radon Moscow with higher-education institutions in the field of young specialists training and advanced training of managerial, technical and administrative staff is reported [ru

  7. Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance

    OpenAIRE

    Rustogi, Kabir; Strusevich, Vitaly A.

    2015-01-01

    We study single machine scheduling problems with linear time-dependent deterioration effects and maintenance activities. Maintenance periods (MPs) are included into the schedule, so that the machine, that gets worse during the processing, can be restored to a better state. We deal with a job-independent version of the deterioration effects, that is, all jobs share a common deterioration rate. However, we introduce a novel extension to such models and allow the deterioration rates to change af...

  8. Iterative group splitting algorithm for opportunistic scheduling systems

    KAUST Repository

    Nam, Haewoon

    2014-05-01

    An efficient feedback algorithm for opportunistic scheduling systems based on iterative group splitting is proposed in this paper. Similar to the opportunistic splitting algorithm, the proposed algorithm adjusts (or lowers) the feedback threshold during a guard period if no user sends a feedback. However, when a feedback collision occurs at any point of time, the proposed algorithm no longer updates the threshold but narrows down the user search space by dividing the users into multiple groups iteratively, whereas the opportunistic splitting algorithm keeps adjusting the threshold until a single user is found. Since the threshold is only updated when no user sends a feedback, it is shown that the proposed algorithm significantly alleviates the signaling overhead for the threshold distribution to the users by the scheduler. More importantly, the proposed algorithm requires a less number of mini-slots than the opportunistic splitting algorithm to make a user selection with a given level of scheduling outage probability or provides a higher ergodic capacity given a certain number of mini-slots. © 2013 IEEE.

  9. Training and information

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Training and Information Division provides centralized direction and coordination for the training and information activities of the Center for Energy and Environment Research (formerly Puerto Rico Nuclear Center). The Division Head serves as Educational Officer, Technical Information Officer, and Public Information Officer. Training responsibilities include registering students; maintaining centralized records on training activities; preparing reports for ERDA; scheduling the utilization of training facilities; providing audiovisual equipment; assisting in the preparation of courses, seminars, symposia, and meetings; administering fellowship programs; and providing personal assistance to students in matters such as housing and immigration. The Division Head represents the Director on the Admissions Committee. Information responsibilities include preparation of manuscripts for ERDA patent clearance and publication release, maintenance of central files on all manuscripts and publications, preparation of the Annual Report, providing editorial and translation assistance, operation of a Technical Reading Room, operation of an ERDA Film Library, operation of a Reproduction Shop, providing copying services, and assisting visitors

  10. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  11. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  12. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  13. Balance Training Enhances Motor Coordination During a Perturbed Sidestep Cutting Task.

    Science.gov (United States)

    Oliveira, Anderson Souza; Silva, Priscila Brito; Lund, Morten Enemark; Farina, Dario; Kersting, Uwe Gustav

    2017-11-01

    Study Design Controlled laboratory study. Background Balance training may improve motor coordination. However, little is known about the changes in motor coordination during unexpected perturbations to postural control following balance training. Objectives To study the effects of balance training on motor coordination and knee mechanics during perturbed sidestep cutting maneuvers in healthy adults. Methods Twenty-six healthy men were randomly assigned to a training group or a control group. Before balance training, subjects performed unperturbed, 90° sidestep cutting maneuvers and 1 unexpected perturbed cut (10-cm translation of a movable platform). Participants in the training group participated in a 6-week balance training program, while those in the control group followed their regular activity schedule. Both groups were retested after a 6-week period. Surface electromyography was recorded from 16 muscles of the supporting limb and trunk, as well as kinematics and ground reaction forces. Motor modules were extracted from electromyography by nonnegative matrix factorization. External knee abduction moments were calculated using inverse dynamics equations. Results Balance training reduced the external knee abduction moment (33% ± 25%, PBalance training also increased burst duration for the motor module related to landing early in the perturbation phase (23% ± 11%, PBalance training resulted in altered motor coordination and a reduction in knee abduction moment during an unexpected perturbation. The previously reported reduction in injury incidence following balance training may be linked to changes in dynamic postural stability and modular neuromuscular control. J Orthop Sports Phys Ther 2017;47(11):853-862. Epub 23 Sep 2017. doi:10.2519/jospt.2017.6980.

  14. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  15. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  16. A short period of high-intensity interval training improves skeletal muscle mitochondrial function and pulmonary oxygen uptake kinetics

    DEFF Research Database (Denmark)

    Christensen, Peter Møller; Jacobs, Robert A; Bonne, Thomas Christian

    2016-01-01

    The aim of the present study was to examine whether improvements in pulmonary V̇O2 kinetics following a short period of high-intensity training (HIT) would be associated with improved skeletal muscle mitochondrial function. Ten untrained male volunteers (age: 26 ± 2; mean ± SD) performed six HIT...

  17. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  18. Training Accreditation Program

    International Nuclear Information System (INIS)

    1989-01-01

    The cornerstone of safe operation of Department of Energy (DOE) nuclear facilities is personnel performing the day-to-day functions which accomplish the facility mission. Training that is conducted efficiently and effectively and is directly related to the needs of the job (i.e. performance-based training) is fundamental to safe operation. Responsibility for the safe operation of these facilities is a line management function. Therefore, achieving performance-based training requires commitment from the organization for which training is provided. This commitment includes making subject matter experts available for participation in and review of the products of the performance-based training process. It also includes budgeting and scheduling the time required for both initial and continuing training. This commitment must be made by corporate and facility senior management from the beginning. Management must get involved at the start to ensure that they are not only cognizant of ongoing activities, but are also involved to the degree necessary to thoroughly understand the process. Policies implemented and support demonstrated by senior management provide the driving force to ensure that training programs receive the attention that is imperative if facility training programs are to be successful

  19. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  20. Preliminary power train design for a state-of-the-art electric vehicle

    Science.gov (United States)

    Ross, J. A.; Wooldridge, G. A.

    1978-01-01

    The state-of-the-art (SOTA) of electric vehicles built since 1965 was reviewed to establish a base for the preliminary design of a power train for a SOTA electric vehicle. The performance of existing electric vehicles were evaluated to establish preliminary specifications for a power train design using state-of-the-art technology and commercially available components. Power train components were evaluated and selected using a computer simulation of the SAE J227a Schedule D driving cycle. Predicted range was determined for a number of motor and controller combinations in conjunction with the mechanical elements of power trains and a battery pack of sixteen lead-acid batteries - 471.7 kg at 0.093 MJ/Kg (1040 lbs. at 11.7 Whr/lb). On the basis of maximum range and overall system efficiency using the Schedule D cycle, an induction motor and 3 phase inverter/controller was selected as the optimum combination when used with a two-speed transaxle and steel belted radial tires. The predicted Schedule D range is 90.4 km (56.2 mi). Four near term improvements to the SOTA were identified, evaluated, and predicted to increase range approximately 7%.

  1. On Several Fundamental Problems of Optimization, Estimation, and Scheduling in Wireless Communications

    Science.gov (United States)

    Gao, Qian

    For both the conventional radio frequency and the comparably recent optical wireless communication systems, extensive effort from the academia had been made in improving the network spectrum efficiency and/or reducing the error rate. To achieve these goals, many fundamental challenges such as power efficient constellation design, nonlinear distortion mitigation, channel training design, network scheduling and etc. need to be properly addressed. In this dissertation, novel schemes are proposed accordingly to deal with specific problems falling in category of these challenges. Rigorous proofs and analyses are provided for each of our work to make a fair comparison with the corresponding peer works to clearly demonstrate the advantages. The first part of this dissertation considers a multi-carrier optical wireless system employing intensity modulation (IM) and direct detection (DD). A block-wise constellation design is presented, which treats the DC-bias that conventionally used solely for biasing purpose as an information basis. Our scheme, we term it MSM-JDCM, takes advantage of the compactness of sphere packing in a higher dimensional space, and in turn power efficient constellations are obtained by solving an advanced convex optimization problem. Besides the significant power gains, the MSM-JDCM has many other merits such as being capable of mitigating nonlinear distortion by including a peak-to-power ratio (PAPR) constraint, minimizing inter-symbol-interference (ISI) caused by frequency-selective fading with a novel precoder designed and embedded, and further reducing the bit-error-rate (BER) by combining with an optimized labeling scheme. The second part addresses several optimization problems in a multi-color visible light communication system, including power efficient constellation design, joint pre-equalizer and constellation design, and modeling of different structured channels with cross-talks. Our novel constellation design scheme, termed CSK-Advanced, is

  2. Self-Rescue Mask Training

    CERN Multimedia

    2013-01-01

    Nine new self-rescue mask instructors have been trained since early 2013, which provides CERN with a total of 26 self-rescue mask instructors to date. This will allow us to meet the increasing training needs caused by the Long Shut Down LS1.   The self-rescue mask instructors have trained 1650 persons in 2012 and about 500 persons since the beginning of the year on how to wear the masks properly. We thank all the instructors and all the persons that made this training possible. Please remember that the self-rescue masks training sessions are scheduled as follows: Basic course: Tuesday and Thursday mornings (2 sessions – 8.30 AM and 10.30 AM), duration:  1.30 hour, in French and English – registration via CERN online training catalogue – Course code 077Y00. Refresher training : Monday mornings (2 sessions – 8.30 AM and 10.30 AM), duration: 1.30 hour , in French and English – registration via CERN online training catalogue &...

  3. Managing the training process: contracting for training services

    International Nuclear Information System (INIS)

    Carlson, E.R.

    1985-01-01

    The need for using consultants and contracting for training services should be based on one or more of these three major reasons: the need to expand capability on a crash basis, the need for specialized expertise, and the need for objectivity, and independence. When the need for using a consultant exists, the training manager must first define the scope of work or services the consultant is to provide and how the consultant will interface with the training staff. The next step will be to develop a Request for Proposal which involves management, training staff, and contract services organizations. The critical parts of an RFP are scope and schedule. Consideration would be given to determining which consultant organizations should receive the RFP, and specifying who is on the bidders list. The third step will consist of evaluating the proposals and awarding the work. This step needs to be objective, defendable, and repeatable. The final phase will be the performance of the work. The activities included are project initiation, monitoring contractor performance, and formal conclusion

  4. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  5. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  6. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  7. Travel time and concurrent-schedule choice: retrospective versus prospective control.

    OpenAIRE

    Davison, M; Elliffe, D

    2000-01-01

    Six pigeons were trained on concurrent variable-interval schedules in which two different travel times between alternatives, 4.5 and 0.5 s, were randomly arranged. In Part 1, the next travel time was signaled while the subjects were responding on each alternative. Generalized matching analyses of performance in the presence of the two travel-time signals showed significantly higher response and time sensitivity when the longer travel time was signaled compared to when the shorter time was sig...

  8. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  9. Extending an open-source real-time operating system with hierarchical scheduling

    NARCIS (Netherlands)

    Holenderski, M.J.; Cools, W.A.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) have been devised to support the integration of independently developed and analyzed subsystems. This paper presents an efficient, modular and extendible design for enhancing a real-time operating system with periodic tasks, two-level fixed-priority HSF

  10. Comparison of Different Approaches to the Cutting Plan Scheduling

    Directory of Open Access Journals (Sweden)

    Peter Bober

    2011-10-01

    Full Text Available Allocation of specific cutting plans and their scheduling to individual cutting machines presents a combinatorial optimization problem. In this respect, various approaches and methods are used to arrive to a viable solution. The paper reports three approaches represented by three discreet optimization methods. The first one is back-tracing algorithm and serves as a reference to verify functionality of the other two ones. The second method is optimization using genetic algorithms, and the third one presents heuristic approach to optimization based on anticipated properties of an optimal solution. Research results indicate that genetic algorithms are demanding to calculate though not dependant on the selected objective function. Heuristic algorithm is fast but dependant upon anticipated properties of the optimal solution. Hence, at change of the objective function it has to be changed. When the scheduling by genetic algorithms is solvable in a sufficiently short period of time, it is more appropriate from the practical point than the heuristic algorithm. The back-tracing algorithm usually does not provide a result in a feasible period of time.

  11. Self-Directed Learning and the Millennial Athletic Training Student

    Science.gov (United States)

    Hughes, Brian J.; Berry, David C.

    2011-01-01

    Athletic training educators (ATEs) have a responsibility to remain aware of the current student population, particularly how they learn and give meaning to what they have learned. Just as clinical athletic trainers (ATs) must adapt to ever changing work schedules and demands, so too must athletic training educators. In addition to adapting to…

  12. Family medicine residency training and burnout: a qualitative study

    Directory of Open Access Journals (Sweden)

    Kimberly Rutherford

    2014-12-01

    Conclusions: The high level of burnout in family medicine residents in BC is a multifactorial and complex phenomenon. Training programs and faculty should be aware of burnout risk factors and strive to implement changes to reduce burnout, including allowing residents increased control over scheduling, access to counseling services and training for resident mentors.

  13. Blood lactate recovery measurements, training, and performance during a 23-week period of competitive swimming.

    Science.gov (United States)

    Pelayo, P; Mujika, I; Sidney, M; Chatard, J C

    1996-01-01

    The purpose of this study was to relate measurements of blood lactate concentration, performance during a maximal anaerobic lactic test (MANLT) and training loads during a 23-week swimming season. Six elite 200-m freestyle male swimmers [mean age 19.5 (SD 1.6) years, height 184 (SD 5) cm and body mass 77.7 (SD 9.0) kg], participated in the study. The MANLT consisted of four all-out 50-m swims interspersed with 10-s recovery periods. Blood lactate concentrations were determined at 3 and 12-min post-exercise and were performed on weeks 2,6,10,14,18 and 21. Swimmers participated in 200-m freestyle competitions on weeks 1,7,13 and 23 (national championships). During weeks 1-10, training mostly involved aerobic exercise, while during weeks, 11-23, it involved anaerobic exercise. At 3-min and 12-min post-MANLT lactate concentrations varied throughout the season [range from 14.9 (SD 1.2) to 18.7 (SD 1.0) mmol.l-1] but demonstrated non-systematic variations. In contrast, the percentage of mean blood lactate decrease (% [La-]recovery) between min 3 and min 12 of the passive recovery post-MANLT increased from week 2 to 10 with aerobic training and decreased from week 10 to 21 with anaerobic training. The MANLT performance improved continuously throughout the season, while competition performance improved during the first three competitions but declined in the final championships, coinciding with the lowest % [La-]recovery and signs of overtraining, such as bad temper and increased sleeping heart rate. The results of this study indicated that % [La-]recovery could be an efficient marker for monitoring the impact of aerobic and anaerobic training and avoiding overtraining in elite 200-m swimmers.

  14. Economics of MRI Operations After Implementation of Interpersonal Skills Training.

    Science.gov (United States)

    Ladapo, Joseph A; Spritzer, Charles E; Nguyen, Xuan V; Pool, Judy; Lang, Elvira

    2018-03-09

    Examine the cost of MRI operations before and after implementation of interpersonal skills training to reduce unanticipated patient-related events in an academic medical center. Teams at four MRI sites (two hospital-based, two freestanding) were trained in evidence-based communication skills in February to April 2015. Training was designed to enable staff members to help patients mobilize their innate coping skills in response to any distress they experienced during their MRI visit. Data were collected before training and afterward from January to June 2016. Staff reported the incidence of disruptive motion, sedation use, MRI delays, incomplete examinations, and no-shows. Cost and revenue associated with MRI operations and staff and physician costs were estimated using Medicare and private insurance rates and data from the US Bureau of Labor Statistics. The study included 12,930 outpatient MRI visits. From baseline to follow-up, average monthly patient volume increased from 1,105 to 1,463 at hospital MRI sites and from 245 to 313 at freestanding MRI sites. Patient factors necessitating sedation or interfering with image progression or quality decreased from 9.0% to 5.5% at hospital sites and from 3.1% to 1.2% at freestanding sites. These changes translated into a reduction in operational costs of $4,600 per 1,000 scheduled patients and an increase in profit of $8,370 per 1,000 scheduled patients in hospital MRI sites, and a corresponding increase in operational costs of $1,570 per 1,000 scheduled-patients and an increase in profit of $12,800 per 1,000 scheduled patients in freestanding MRI sites. We found significant improvements in MRI operational efficiency after interpersonal skills team training, which were associated with reductions in costs and growth in revenue. Copyright © 2018 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  15. Declarative Modeling for Production Order Portfolio Scheduling

    Directory of Open Access Journals (Sweden)

    Banaszak Zbigniew

    2014-12-01

    Full Text Available A declarative framework enabling to determine conditions as well as to develop decision-making software supporting small- and medium-sized enterprises aimed at unique, multi-project-like and mass customized oriented production is discussed. A set of unique production orders grouped into portfolio orders is considered. Operations executed along different production orders share available resources following a mutual exclusion protocol. A unique product or production batch is completed while following a given activity’s network order. The problem concerns scheduling a newly inserted project portfolio subject to constraints imposed by a multi-project environment The answers sought are: Can a given project portfolio specified by its cost and completion time be completed within the assumed time period in a manufacturing system in hand? Which manufacturing system capability guarantees the completion of a given project portfolio ordered under assumed cost and time constraints? The considered problems regard finding a computationally effective approach aimed at simultaneous routing and allocation as well as batching and scheduling of a newly ordered project portfolio subject to constraints imposed by a multi-project environment. The main objective is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multi-project-like and mass customized oriented production scheduling. Multiple illustrative examples are discussed.

  16. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  17. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  18. Influence of intravenous self-administered psychomotor stimulants on performance of rhesus monkeys in a multiple schedule paradigm.

    Science.gov (United States)

    Hoffmeister, F

    1980-01-01

    Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.

  19. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  20. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  1. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  2. Interruption of scheduled, automatic feeding and reduction of excess energy intake in toddlers

    Directory of Open Access Journals (Sweden)

    Ciampolini M

    2013-01-01

    Full Text Available Mario Ciampolini,1 J Thomas Brenna,2 Valerio Giannellini,3 Stefania Bini11Preventive Gastroenterology Unit, Department of Paediatrics, Università di Firenze, Florence, Italy; 2Division of Nutritional Sciences, Cornell University, Ithaca, NY, USA; 3Department of Pharmaceutical Sciences, Università di Firenze, Florence, ItalyBackground: Childhood obesity due to the consumption of excess calories is a severe problem in developed countries. In a previous investigation on toddlers, hospital laboratory measurements showed an association of food-demand behavior with constant lower blood glucose before meals than for scheduled meals. We hypothesize that maternal scheduling of meals for toddlers results in excess energy intake compared to feeding only on demand (previously “on request”.Objective: We tested the cross-sectional null hypothesis of no difference in energy intake between scheduled (automatic and demanded meals (administered after evaluation in 24 mother–toddler (21 months old at entry pairs with chronic, nonspecific diarrhea presenting at a clinic. We tested the same hypothesis in a subset of 14 toddlers by measuring the resting (sleeping metabolic rate 4 hours after lunch, as well as the total daily energy expenditure (TEE in 10 toddlers.Methods: We trained mothers to recognize meal demands (as in the previous investigation and to provide food in response, but required no blood glucose measurements before meals. Energy intake was assessed by a 10-day food diary, resting metabolic rate (RMR by respiratory analyses (indirect calorimetry in 14 toddlers, and TEE by doubly labeled water in 10 toddlers. Their blood parameters, anthropometry, and number of days with diarrhea were assessed before training and 50 days after training.Results: RMR decreased from 58.6 ± 7.8 to 49.0 ± 9.1 kcal/kg/d (P < 0.001 and TEE decreased from 80.1 ± 6.9 to 67.8 ± 10.0 kcal/kg/d (P < 0.001. Energy intake decreased from 85.7 ± 15.3 to 70.3 ± 15.8 kcal

  3. Injuries in women associated with a periodized strength training and running program.

    Science.gov (United States)

    Reynolds, K L; Harman, E A; Worsham, R E; Sykes, M B; Frykman, P N; Backus, V L

    2001-02-01

    Forty-five women participated in a 24-week physical training program designed to improve lifting, load carriage, and running performance. Activities included weightlifting, running, backpacking, lift and carry drills, and sprint running. Physicians documented by passive surveillance all training-related injuries. Thirty-two women successfully completed training program. Twenty-two women (48.9%) suffered least 1 injury during training, but only 2 women had to drop out of the study because of injuries. The rate of injury associated with lost training time was 2.8 injuries per 1,000 training hours of exposure. Total clinic visits and days lost from training were 89 and 69, respectively. Most injuries were the overuse type involving the lower back, knees, and feet. Weightlifting accounted for a majority of the lost training days. A combined strength training and running program resulted in significant performance gains in women. Only 2 out of 45 participants left the training program cause of injuries.

  4. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  5. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  6. Long range planning, scheduling and budgeting for the environmental compliance program at the Rocky Flats Plant

    International Nuclear Information System (INIS)

    McKinley, K.B.; Nielsen, T.H.

    1989-01-01

    This paper reports how the Rocky Flats RCRA/CERCLA group at the Rocky Flats Plant in Golden, Colorado is developing a computerized schedule and budget management system. The system will aggregate schedule, budgets, and regulatory commitments provided by RCRA/CERCLA program managers. The system will provide tabular and graphical representations of the schedule and budget information at various levels of detail. The system will perform a variety of analyses on the schedule and budget. The RCRA/CERCLA group will use the results to develop realistic compliance schedules and the budgets necessary to meet them. Presentation of the schedules and budgets in a consistent graphical and tabular form will give a good appreciation of the remediation costs as understood by the RCRA/CERCLA group. The system will then be used to test resource availability and remediation period scenarios, differing from the optimal combination as determined by the RCRA/CERCLA group

  7. Engine Torque Control of Spark Ignition Engine using Fuzzy Gain Scheduling

    OpenAIRE

    Aris Triwiyatno

    2012-01-01

    In the spark ignition engine system, driver convenience is very dependent on satisfying engine torque appropriate with the throttle position given by the driver. Unfortunately, sometimes the fulfillment of engine torque is not in line with fuel saving efforts. This requires the development of high performance and robust power train controllers. One way to potentially meet these performance requirements is to introduce a method of controlling engine torque using fuzzy gain scheduling. By using...

  8. HOROPLAN: computer-assisted nurse scheduling using constraint-based programming.

    Science.gov (United States)

    Darmoni, S J; Fajner, A; Mahé, N; Leforestier, A; Vondracek, M; Stelian, O; Baldenweck, M

    1995-01-01

    Nurse scheduling is a difficult and time consuming task. The schedule has to determine the day to day shift assignments of each nurse for a specified period of time in a way that satisfies the given requirements as much as possible, taking into account the wishes of nurses as closely as possible. This paper presents a constraint-based, artificial intelligence approach by describing a prototype implementation developed with the Charme language and the first results of its use in the Rouen University Hospital. Horoplan implements a non-cyclical constraint-based scheduling, using some heuristics. Four levels of constraints were defined to give a maximum of flexibility: French level (e.g. number of worked hours in a year), hospital level (e.g. specific day-off), department level (e.g. specific shift) and care unit level (e.g. specific pattern for week-ends). Some constraints must always be verified and can not be overruled and some constraints can be overruled at a certain cost. Rescheduling is possible at any time specially in case of an unscheduled absence.

  9. Upcoming training sessions (up to end October) - Places available

    CERN Multimedia

    2016-01-01

    Please find below a list of training sessions scheduled to take place up to the end of October with places available.   Safety and Language courses are not included here, you will find an up-to-date list in the Training Catalogue. If you need a course which is not featured  in the catalogue, please contact one of the following: your supervisor, your Departmental Training Officer or the relevant learning specialist.  

  10. Intelligent Scheduling of a Grid-Connected Heat Pump in a Danish Detached House

    DEFF Research Database (Denmark)

    Gianniou, Panagiota; Foteinaki, Kyriaki; Heller, Alfred

    This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation of ...... thermal comfort conditions. The proposed methodology bridges dynamic building modelling with optimization of real-time operation of HVAC systems offering a detailed model for building physics, especially regarding thermal mass and a stochastic price-based control....... of the system is based on a price-signal considering a three-day period for different weather cases. The results show that the optimal scheduling of the system is successful in terms of reducing the peak load during times when electricity prices are high, thus achieving cost savings as well as maintaining good......This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation...

  11. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  12. Computer Graphics Orientation and Training in a Corporate/Production Environment.

    Science.gov (United States)

    McDevitt, Marsha Jean

    This master's thesis provides an overview of a computer graphics production environment and proposes a realistic approach to orientation and on-going training for employees working within a fast-paced production schedule. Problems involved in meeting the training needs of employees are briefly discussed in the first chapter, while the second…

  13. Improvement of the training process of qualified female athletes engaged in bodybuilding in the general preparatory stage of the preparatory period, taking into account the biological cycle

    Directory of Open Access Journals (Sweden)

    Viacheslav Mulyk

    2017-06-01

    Full Text Available Purpose: substantiation of the methodology of the training process of qualified female athletes engaged in bodybuilding in the general preparatory stage of the preparatory period, taking into account the biological cycle. Material & Methods: in the study participated 18 qualified female athletes engaged in bodybuilding, included in the Kharkov region team of bodybuilding. Results: comparative characteristic of the most frequently used methodology of the training process in bodybuilding are shows. An optimal methodology for qualified female athletes engaged in bodybuilding has been developed and justified, depending on the initial form of the athlete at the beginning of the general preparatory stage of the training. The dependence of the change in the body weight of female athletes from the training process is shows. Conclusion: on the basis of the study, the author suggests an optimal training methodology depending on the mesocycle of training in the preparatory period in the general preparatory stage.

  14. MODALITIES OF TRAINING PARAMETER ALTERNATION IN NOWADAYS STRENGTH TRAINING PRACTICE

    Directory of Open Access Journals (Sweden)

    RANISAVLJEV IGOR

    2010-12-01

    Full Text Available Large number of variables could be alternated during the process of planning and programming in sports training. Superior training results in majority of sports are achieved by optimally manipulating training parameters in appropriate sequences and combinations. Additionally, in some sports they might be the result of appropriate periodization pattern. Today's tendency in strength training practice is training movements instead of training muscles. Exercise classification according to the dominant movement types, allows creating new modalities in training alternation. Additional variations in volume, intensity, rest brakes, repetition velocity andinter-repetition rest can be the important part of functional strength training program. Alternation and combination of different training parameters makes appropriate training stimulus for strength increase in the most of nowadays sports. Optimal alternation of basic training parameters should be the first part in the processof planning and programming. As a result, majority of athletes might not need advanced periodization patterns for optimal improvement in muscle strength and power

  15. Nurse Scheduling by Cooperative GA with Effective Mutation Operator

    Science.gov (United States)

    Ohki, Makoto

    In this paper, we propose an effective mutation operators for Cooperative Genetic Algorithm (CGA) to be applied to a practical Nurse Scheduling Problem (NSP). The nurse scheduling is a very difficult task, because NSP is a complex combinatorial optimizing problem for which many requirements must be considered. In real hospitals, the schedule changes frequently. The changes of the shift schedule yields various problems, for example, a fall in the nursing level. We describe a technique of the reoptimization of the nurse schedule in response to a change. The conventional CGA is superior in ability for local search by means of its crossover operator, but often stagnates at the unfavorable situation because it is inferior to ability for global search. When the optimization stagnates for long generation cycle, a searching point, population in this case, would be caught in a wide local minimum area. To escape such local minimum area, small change in a population should be required. Based on such consideration, we propose a mutation operator activated depending on the optimization speed. When the optimization stagnates, in other words, when the optimization speed decreases, the mutation yields small changes in the population. Then the population is able to escape from a local minimum area by means of the mutation. However, this mutation operator requires two well-defined parameters. This means that user have to consider the value of these parameters carefully. To solve this problem, we propose a periodic mutation operator which has only one parameter to define itself. This simplified mutation operator is effective over a wide range of the parameter value.

  16. Turning inspection regulations into training tools

    International Nuclear Information System (INIS)

    Finley, D.; Wheatcraft, D.

    1996-01-01

    In response to suggestions from internal and State of California auditors, the Hazardous Waste Management Division (HWM) at Lawrence Livermore National Laboratory prepared an Inspection Schedule and Guidance Document that summarizes the Laboratory's inspection schedule and procedures for waste treatment, storage, and disposal facilities (TSDFs). Because it explains and comments in detail on the inspection schedule, forms, and procedures, this document is a centralized reference for HWM managers and personnel performing TSDF inspections at the Laboratory. It is also a training tool for experienced and new inspectors, standardizing the inspections of personnel with experience and explaining to novices what to look for and why. This poster presentation traces the team effort that created this document and provides specific examples of how the document was developed and how it is used

  17. Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics

    OpenAIRE

    Pérez González, Paz; Framiñán Torres, José Manuel

    2009-01-01

    In this paper, we address the problem of scheduling a set of jobs in a flowshop with makespan objective. In contrast to the usual assumption of machine availability presented in most research, we consider that machines may not be available at the beginning of the planning period, due to processing of previously scheduled jobs. We first formulate the problem, analyse the structure of solutions depending on a number of factors (such as machines, jobs, structure of the processing times, availabi...

  18. Game Schedules and Rate of Concussions in the National Football League.

    Science.gov (United States)

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  19. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  20. Effectiveness and efficiency of training in digital healthcare packages: training doctors to use digital medical record keeping software.

    Science.gov (United States)

    Benwell, Nicola; Hird, Kathryn; Thomas, Nicholas; Furness, Erin; Fear, Mark; Sweetman, Greg

    2017-10-01

    costly and there is little other than anecdotal evidence that currently supports its efficacy in the workplace. What does the paper add? Assessment of accuracy when using the BOSSnet system over time revealed that daily use rather than formalised training appeared to have the most impact on performance. Formalised training was rated poorly, and this appeared to correlate with time between training and use. The present study suggests that formalised training, if required, should be delivered close in time to actual use of the system to benefit end-users. The study also shows that daily experience is more effective than formalised training to improve accuracy. What are the implications for practitioners? Formalised training for ICT needs to be scheduled in close proximity to end-user use of the ICT. Current scheduling may be beneficial for ease of delivery, but unless it is delivered at a suitable time the benefits are minimal. Formalised training programs may not be critical for all staff and all staff improve with contextualised experience given time. Training may be better suited to optional rather than compulsory delivery programs with ongoing delivery to suit user schedules.

  1. Variable training does not lead to better motor learning compared to repetitive training in children with and without DCD when exposed to active video games.

    Science.gov (United States)

    Bonney, Emmanuel; Jelsma, Dorothee; Ferguson, Gillian; Smits-Engelsman, Bouwien

    2017-03-01

    Little is known about the influence of practice schedules on motor learning and skills transfer in children with and without developmental coordination disorder (DCD). Understanding how practice schedules affect motor learning is necessary for motor skills development and rehabilitation. The study investigated whether active video games (exergames) training delivered under variable practice led to better learning and transfer than repetitive practice. 111 children aged 6-10 years (M=8.0, SD=1.0) with no active exergaming experience were randomized to receive exergames training delivered under variable (Variable Game Group (VGG), n=56) or repetitive practice schedule (Repetitive Game Group (RGG), n=55). Half the participants were identified as DCD using the DSM-5 criteria, while the rest were typically developing (TD), age-matched children. Both groups participated in two 20min sessions per week for 5 weeks. Both participant groups (TD and DCD) improved equally well on game performance. There was no significant difference in positive transfer to balance tasks between practice schedules (Repetitive and Variable) and participant groups (TD and DCD). Children with and without DCD learn balance skills quite well when exposed to exergames. Gains in learning and transfer are similar regardless of the form of practice schedule employed. This is the first paper to compare the effect of practice schedules on learning in children with DCD and those with typical development. No differences in motor learning were found between repetitive and variable practice schedules. When children with and without DCD spend the same amount of time on exergames, they do not show any differences in acquisition of motor skills. Transfer of motor skills is similar in children with and without DCD regardless of differences in practice schedules. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Aircraft emission inventories for scheduled air traffic for the 1976-92 time period. Historical trends

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S L; Henderson, S C; Tritz, T G [Boeing Co., Seattle, WA (United States)

    1998-12-31

    Emission inventories of fuel burned, NO{sub x}, CO, and hydrocarbons have been calculated for scheduled air traffic in 1976, 1984, 1990 and 1992 on a 1 deg latitude x 1 deg longitude x 1 km pressure altitude grid. Using this database, the seasonal variation and historical trends in aircraft emissions have been calculated for selected geographical regions (e.g., North Atlantic, Europe, North America, North Pacific). The trend in emissions is a combination of the effects of passenger demand growth, improved aircraft efficiency, changes in combustor characteristics, and aircraft size. (author) 8 refs.

  3. Aircraft emission inventories for scheduled air traffic for the 1976-92 time period. Historical trends

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S.L.; Henderson, S.C.; Tritz, T.G. [Boeing Co., Seattle, WA (United States)

    1997-12-31

    Emission inventories of fuel burned, NO{sub x}, CO, and hydrocarbons have been calculated for scheduled air traffic in 1976, 1984, 1990 and 1992 on a 1 deg latitude x 1 deg longitude x 1 km pressure altitude grid. Using this database, the seasonal variation and historical trends in aircraft emissions have been calculated for selected geographical regions (e.g., North Atlantic, Europe, North America, North Pacific). The trend in emissions is a combination of the effects of passenger demand growth, improved aircraft efficiency, changes in combustor characteristics, and aircraft size. (author) 8 refs.

  4. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  5. Comparing fixed-amount and progressive-amount DRO Schedules for tic suppression in youth with chronic tic disorders.

    Science.gov (United States)

    Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W

    2017-01-01

    Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.

  6. An Evaluation of Photographic Activity Schedules to Increase Independent Playground Skills in Young Children with Autism

    Science.gov (United States)

    Akers, Jessica S.; Higbee, Thomas S.; Pollard, Joy S.; Pellegrino, Azure J.; Gerencser, Kristina R.

    2016-01-01

    We used photographic activity schedules to increase the number of play activities completed by children with autism during unstructured time on the playground. All 3 participants engaged in more playground activities during and after training, and they continued to complete activities when novel photographs were introduced.

  7. Approaches to training in companies

    Directory of Open Access Journals (Sweden)

    Magnoler Patrizia

    2016-12-01

    Full Text Available The need to address generational change and the challenges of a global market in terms of maintaining productivity require small and medium enterprises, mainly of an artisanal nature, to rethink training. The challenges mainly concern production capacity, which is increasingly problematic given that demand does not allow for long-term schedules and enhancement of human resources. There are many tensions and just as many needs for improvement, and training is therefore the space in which to collect and rework in order to restore a new perspective of sustainable and quality change.

  8. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  9. Comprehensive Approach Training Toolkit: Training Needs Analysis

    Science.gov (United States)

    2013-03-01

    general. t necessarily lea to act). Very litt Yoruba . entations liarization (FAM ology Integratio es. Content is p given cultural g nd pertinent lan...and focus-g training the C cially other g ncrease its th ng with CA c cation and re e cultural aw needs to con ; and g) traini g schedules a s are...milita tifs, de cultur olton, Febbra t, 2013; Thom es FC dans l’ la formation borer une boî alisée chez n ons se sont d ir compte dan é à clarifier l

  10. A review of metaheuristic scheduling techniques in cloud computing

    Directory of Open Access Journals (Sweden)

    Mala Kalra

    2015-11-01

    Full Text Available Cloud computing has become a buzzword in the area of high performance distributed computing as it provides on-demand access to shared pool of resources over Internet in a self-service, dynamically scalable and metered manner. Cloud computing is still in its infancy, so to reap its full benefits, much research is required across a broad array of topics. One of the important research issues which need to be focused for its efficient performance is scheduling. The goal of scheduling is to map tasks to appropriate resources that optimize one or more objectives. Scheduling in cloud computing belongs to a category of problems known as NP-hard problem due to large solution space and thus it takes a long time to find an optimal solution. There are no algorithms which may produce optimal solution within polynomial time to solve these problems. In cloud environment, it is preferable to find suboptimal solution, but in short period of time. Metaheuristic based techniques have been proved to achieve near optimal solutions within reasonable time for such problems. In this paper, we provide an extensive survey and comparative analysis of various scheduling algorithms for cloud and grid environments based on three popular metaheuristic techniques: Ant Colony Optimization (ACO, Genetic Algorithm (GA and Particle Swarm Optimization (PSO, and two novel techniques: League Championship Algorithm (LCA and BAT algorithm.

  11. Periodization Theory: Confronting an Inconvenient Truth.

    Science.gov (United States)

    Kiely, John

    2018-04-01

    Periodization theory has, over the past seven decades, emerged as the preeminent training planning paradigm. The philosophical underpinnings of periodization theory can be traced back to the integration of diverse shaping influences, whereby coaching beliefs and traditions were blended with historically available scientific insights and contextualized against pervading social planning models. Since then, many dimensions of elite preparation have evolved significantly, as driven by a combination of coaching innovations and science-led advances in training theory, techniques, and technologies. These advances have been incorporated into the fabric of the pre-existing periodization planning framework, yet the philosophical assumptions underpinning periodization remain largely unchallenged and unchanged. One particularly influential academic sphere of study, the science of stress, particularly the work of Hans Selye, is repeatedly cited by theorists as a central pillar upon which periodization theory is founded. A fundamental assumption emanating from the early stress research is that physical stress is primarily a biologically mediated phenomenon: a presumption translated to athletic performance contexts as evidence that mechanical training stress directly regulates the magnitude of subsequent 'fitness' adaptations. Interestingly, however, since periodization theory first emerged, the science of stress has evolved extensively from its historical roots. This raises a fundamental question: if the original scientific platform upon which periodization theory was founded has disintegrated, should we critically re-evaluate conventional perspectives through an updated conceptual lens? Realigning periodization philosophy with contemporary stress theory thus presents us with an opportunity to recalibrate training planning models with both contemporary scientific insight and progressive coaching practice.

  12. Timing analysis for embedded systems using non-preemptive EDF scheduling under bounded error arrivals

    Directory of Open Access Journals (Sweden)

    Michael Short

    2017-07-01

    Full Text Available Embedded systems consist of one or more processing units which are completely encapsulated by the devices under their control, and they often have stringent timing constraints associated with their functional specification. Previous research has considered the performance of different types of task scheduling algorithm and developed associated timing analysis techniques for such systems. Although preemptive scheduling techniques have traditionally been favored, rapid increases in processor speeds combined with improved insights into the behavior of non-preemptive scheduling techniques have seen an increased interest in their use for real-time applications such as multimedia, automation and control. However when non-preemptive scheduling techniques are employed there is a potential lack of error confinement should any timing errors occur in individual software tasks. In this paper, the focus is upon adding fault tolerance in systems using non-preemptive deadline-driven scheduling. Schedulability conditions are derived for fault-tolerant periodic and sporadic task sets experiencing bounded error arrivals under non-preemptive deadline scheduling. A timing analysis algorithm is presented based upon these conditions and its run-time properties are studied. Computational experiments show it to be highly efficient in terms of run-time complexity and competitive ratio when compared to previous approaches.

  13. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  14. Intensified training increases salivary free light chains in trained cyclists: Indication that training volume increases oral inflammation.

    Science.gov (United States)

    Heaney, Jennifer L J; Killer, Sophie C; Svendsen, Ida S; Gleeson, Michael; Campbell, John P

    2018-05-01

    Periods of short-term intensified training (IT) are often used by athletes during training cycles over the season and undergoing phases of increased physical stress may impact upon the immune system. This study investigated the effects of a period of IT on free light chains (FLCs) in saliva - an emerging immune biomarker of oral inflammation - and matched serum samples in well-trained athletes. It also examined if IT influences basal FLC levels and FLC flux during acute exercise. Highly trained male cyclists (n = 10) underwent a 9-day period of IT; before and after IT participants performed a 1 h time trial (TT) on a cycle ergometer, with blood and saliva samples collected pre- and post-exercise. FLCs were assessed in serum and saliva, and IgG, IgA, IgM and creatinine were also measured in serum. Weekly training volume increased by 143% (95% CI 114-172%), p training. Following IT, the cyclists demonstrated higher salivary FLC levels. Both salivary lambda FLC concentrations (p training, and we show for the first time that FLCs may have utility as a marker of exercise stress and oral health status. Copyright © 2018 Elsevier Inc. All rights reserved.

  15. Simulation-Based Dynamic Passenger Flow Assignment Modelling for a Schedule-Based Transit Network

    Directory of Open Access Journals (Sweden)

    Xiangming Yao

    2017-01-01

    Full Text Available The online operation management and the offline policy evaluation in complex transit networks require an effective dynamic traffic assignment (DTA method that can capture the temporal-spatial nature of traffic flows. The objective of this work is to propose a simulation-based dynamic passenger assignment framework and models for such applications in the context of schedule-based rail transit systems. In the simulation framework, travellers are regarded as individual agents who are able to obtain complete information on the current traffic conditions. A combined route selection model integrated with pretrip route selection and entrip route switch is established for achieving the dynamic network flow equilibrium status. The train agent is operated strictly with the timetable and its capacity limitation is considered. A continuous time-driven simulator based on the proposed framework and models is developed, whose performance is illustrated through a large-scale network of Beijing subway. The results indicate that more than 0.8 million individual passengers and thousands of trains can be simulated simultaneously at a speed ten times faster than real time. This study provides an efficient approach to analyze the dynamic demand-supply relationship for large schedule-based transit networks.

  16. The effect of ratio and interval training on Pavlovian-instrumental transfer in mice.

    Directory of Open Access Journals (Sweden)

    Brian J Wiltgen

    Full Text Available Conditional stimuli (CS that are paired with reward can be used to motivate instrumental responses. This process is called Pavlovian-instrumental transfer (PIT. A recent study in rats suggested that habitual responses are particularly sensitive to the motivational effects of reward cues. The current experiments examined this idea using ratio and interval training in mice. Two groups of animals were trained to lever press for food pellets that were delivered on random ratio or random interval schedules. Devaluation tests revealed that interval training led to habitual responding while ratio training produced goal-directed actions. The presentation of CSs paired with reward led to positive transfer in both groups, however, the size of this effect was much larger in mice that were trained on interval schedules. This result suggests that habitual responses are more sensitive to the motivational influence of reward cues than goal-directed actions. The implications for neurobiological models of motivation and drug seeking behaviors are discussed.

  17. Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals

    Directory of Open Access Journals (Sweden)

    Peng Guo

    2013-04-01

    Full Text Available Railway container terminals, where gantry cranes are responsible for loading and unloading containers between freight trains and yards, are important hubs of hinterland logistics transportation. Terminal managers confront the challenge in improving the efficiency of their service. As the most expensive equipment in a terminal, the operational performance of gantry cranes is a crucial factor. In this paper, the gantry crane scheduling problem of railway container terminals is investigated. A mixed integer programming model which considers the effect of dwelling position dependent processing times is formulated. In addition, the safety distances, the travel times and the non-crossing requirement of cranes are incorporated in the mathematical model. A novel discrete artificial bee colony algorithm is presented to solve the intractable scheduling problem. Computational experiments are conducted to evaluate the proposed algorithm on some randomly constructed instances based on typical terminal operational data. Experimental results show that the proposed approach can obtain near optimal solutions for the investigated problem in a reasonable computational time.

  18. Is modified brief assertiveness training for nurses effective? A single-group study with long-term follow-up.

    Science.gov (United States)

    Yoshinaga, Naoki; Nakamura, Yohei; Tanoue, Hiroki; MacLiam, Fionnula; Aoishi, Keiko; Shiraishi, Yuko

    2018-01-01

    To evaluate the long-term effectiveness of modified brief assertiveness training (with cognitive techniques) for nurses. Most assertiveness training takes a long time to conduct; thus, briefer training is required for universal on-the-job training in the workplace. In this single-group study, nurses received two 90-min training sessions with a 1-month interval between sessions. The degree of assertiveness was assessed by using the Rathus Assertiveness Schedule as the primary outcome, at four time points: pre- and post-training, 3-month follow-up and 6-month follow-up. A total of 33 nurses received the training, and the mean Rathus Assertiveness Schedule score improved from -14.2 (SD = 16.5) pre-training to -10.5 (SD = 18.0) post-training (p open environment for communication leads to improved job satisfaction, improved nursing care and increased patient safety. © 2017 The Authors. Journal of Nursing Management Published by John Wiley & Sons Ltd.

  19. Functional changes in the reward circuit in response to gaming-related cues after training with a commercial video game.

    Science.gov (United States)

    Gleich, Tobias; Lorenz, Robert C; Gallinat, Jürgen; Kühn, Simone

    2017-05-15

    In the present longitudinal study, we aimed to investigate video game training associated neuronal changes in reward processing using functional magnetic resonance imaging (fMRI). We recruited 48 healthy young participants which were assigned to one of 2 groups: A group in which participants were instructed to play a commercial video game ("Super Mario 64 DS") on a portable Nintendo DS handheld console at least 30minutes a day over a period of two months (video gaming group; VG) or to a matched passive control group (CG). Before and after the training phase, in both groups, fMRI imaging was conducted during passively viewing reward and punishment-related videos sequences recorded from the trained video game. The results show that video game training may lead to reward related decrease in neuronal activation in the dorsolateral prefrontal cortex (DLPFC) and increase in the hippocampus. Additionally, the decrease in DLPFC activation was associated with gaming related parameters experienced during playing. Specifically, we found that in the VG, gaming related parameters like performance, experienced fun and frustration (assessed during the training period) were correlated to decrease in reward related DLPFC activity. Thus, neuronal changes in terms of video game training seem to be highly related to the appetitive character and reinforcement schedule of the game. Those neuronal changes may also be related to the often reported video game associated improvements in cognitive functions. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. A real-time Excel-based scheduling solution for nursing staff reallocation.

    Science.gov (United States)

    Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna

    2016-09-30

    Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.

  1. Resource planning and scheduling of payload for satellite with particle swarm optimization

    Science.gov (United States)

    Li, Jian; Wang, Cheng

    2007-11-01

    The resource planning and scheduling technology of payload is a key technology to realize an automated control for earth observing satellite with limited resources on satellite, which is implemented to arrange the works states of various payloads to carry out missions by optimizing the scheme of the resources. The scheduling task is a difficult constraint optimization problem with various and mutative requests and constraints. Based on the analysis of the satellite's functions and the payload's resource constraints, a proactive planning and scheduling strategy based on the availability of consumable and replenishable resources in time-order is introduced along with dividing the planning and scheduling period to several pieces. A particle swarm optimization algorithm is proposed to address the problem with an adaptive mutation operator selection, where the swarm is divided into groups with different probabilities to employ various mutation operators viz., differential evolution, Gaussian and random mutation operators. The probabilities are adjusted adaptively by comparing the effectiveness of the groups to select a proper operator. The simulation results have shown the feasibility and effectiveness of the method.

  2. T-L Plane Abstraction-Based Energy-Efficient Real-Time Scheduling for Multi-Core Wireless Sensors

    Directory of Open Access Journals (Sweden)

    Youngmin Kim

    2016-07-01

    Full Text Available Energy efficiency is considered as a critical requirement for wireless sensor networks. As more wireless sensor nodes are equipped with multi-cores, there are emerging needs for energy-efficient real-time scheduling algorithms. The T-L plane-based scheme is known to be an optimal global scheduling technique for periodic real-time tasks on multi-cores. Unfortunately, there has been a scarcity of studies on extending T-L plane-based scheduling algorithms to exploit energy-saving techniques. In this paper, we propose a new T-L plane-based algorithm enabling energy-efficient real-time scheduling on multi-core sensor nodes with dynamic power management (DPM. Our approach addresses the overhead of processor mode transitions and reduces fragmentations of the idle time, which are inherent in T-L plane-based algorithms. Our experimental results show the effectiveness of the proposed algorithm compared to other energy-aware scheduling methods on T-L plane abstraction.

  3. Optimal joint scheduling of electrical and thermal appliances in a smart home environment

    International Nuclear Information System (INIS)

    Shirazi, Elham; Zakariazadeh, Alireza; Jadid, Shahram

    2015-01-01

    Highlights: • Thermal appliances are scheduled based on desired temperature and energy prices. • A discomfort index has been introduced within the home energy scheduling model. • Appliances are scheduled based on activity probability and desired options. • Starting probability depends on the social random factor and consumption behavior. - Abstract: With the development of home area network, residents have the opportunity to schedule their power usage in the home by themselves aiming at reducing electricity expenses. Moreover, as renewable energy sources are deployed in home, a home energy management system needs to consider both energy consumption and generation simultaneously to minimize the energy cost. In this paper, a smart home energy management model has been presented in which electrical and thermal appliances are jointly scheduled. The proposed method aims at minimizing the electricity cost of a residential customer by scheduling various type of appliances considering the residents consumption behavior, seasonal probability, social random factor, discomfort index and appliances starting probability functions. In this model, the home central controller receives the electricity price information, environmental factors data as well as the resident desired options in order to optimally schedule appliances including electrical and thermal. The scheduling approach is tested on a typical home including variety of home appliances, a small wind turbine, photovoltaic panel, combined heat and power unit, boiler and electrical and thermal storages over a 24-h period. The results show that the scheduling of different appliances can be reached simultaneously by using the proposed formulation. Moreover, simulation results evidenced that the proposed home energy management model exhibits a lower cost and, therefore, is more economical.

  4. Differential effects of massed and spaced training on place and response learning: A memory systems perspective.

    Science.gov (United States)

    Wingard, Jeffrey C; Goodman, Jarid; Leong, Kah-Chung; Packard, Mark G

    2015-09-01

    Studies employing brain lesion or intracerebral drug infusions in rats have demonstrated a double dissociation between the roles of the hippocampus and dorsolateral striatum in place and response learning. The hippocampus mediates a rapid cognitive learning process underlying place learning, whereas the dorsolateral striatum mediates a relatively slower learning process in which stimulus-response habits underlying response learning are acquired in an incremental fashion. One potential implication of these findings is that hippocampus-dependent learning may benefit from a relative massing of training trials, whereas dorsal striatum-dependent learning may benefit from a relative distribution of training trials. In order to examine this hypothesis, the present study compared the effects of massed (30s inter-trial interval; ITI) or spaced (30min ITI) training on acquisition of a hippocampus-dependent place learning task, and a dorsolateral striatum-dependent response task in a plus-maze. In the place task rats swam from varying start points (N or S) to a hidden escape platform located in a consistent spatial location (W). In the response task rats swam from varying start points (N or S) to a hidden escape platform located in the maze arm consistent with a body-turn response (left). In the place task, rats trained with the massed trial schedule acquired the task quicker than rats trained with the spaced trial schedule. In the response task, rats trained with the spaced trial schedule acquired the task quicker than rats trained with the massed trial schedule. The double dissociation observed suggests that the reinforcement parameters most conducive to effective learning in hippocampus-dependent and dorsolateral striatum-dependent learning may have differential temporal characteristics. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  6. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  7. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  8. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  9. Economic appraisal of deployment schedules for high-level radioactive waste repositories

    International Nuclear Information System (INIS)

    Hoai Linh Doan, Phuong; Duquesnoy, T.; Devezeaux de Lavergne, J.G.

    2017-01-01

    The deep geological repository (DGR) is considered as the definitive management solution for high-level radioactive waste (HLW). Countries defined different DGR implementation schedules, depending on their national context and political choices. We raise the question of the economic grounds of such political decisions by providing an economic analysis of different DGR schedules. We investigate the optimal timing for DGR commissioning based on available Nuclear Energy Agency (NEA) data (2013). Two scenarios are considered: -1) rescheduling the deployment of a DGR with the same initial operational period, and -2) rescheduling the deployment of a DGR with a shorter operational period, i.e. initial closure date. Given the long timescales of such projects, we also take into account the discounting effect. The first finding is that it appears more economically favorable to extend the interim storage than to dispose of the HLW immediately. Countries which chose 'immediate' disposal are willing to accept higher costs to quickly solve the problem. Another interesting result is that there is an optimal solution with respect to the length of DGR operational period and the waste flow for disposal. Based on data provided by the Organisation for Economic Cooperation and Development (OECD)/Nuclear Energy Agency (NEA), we find an optimal operating period of about 15 years with a flow of 2000 tHM/year. (authors)

  10. Economic appraisal of deployment schedules for high-level radioactive waste repositories

    Directory of Open Access Journals (Sweden)

    Doan Phuong Hoai Linh

    2017-01-01

    Full Text Available The deep geological repository (DGR is considered as the definitive management solution for high-level waste (HLW. Countries defined different DGR implementation schedules, depending on their national context and political choices. We raise the question of the economic grounds of such political decisions by providing an economic analysis of different DGR schedules. We investigate the optimal timing for DGR commissioning based on available Nuclear Energy Agency (NEA data (2013. Two scenarios are considered: (1 rescheduling the deployment of a DGR with the same initial operational period, and (2 rescheduling the deployment of a DGR with a shorter operational period, i.e. initial closure date. Given the long timescales of such projects, we also take into account the discounting effect. The first finding is that it appears more economically favorable to extend the interim storage than to dispose of the HLW immediately. Countries which chose “immediate” disposal are willing to accept higher costs to quickly solve the problem. Another interesting result is that there is an optimal solution with respect to the length of DGR operational period and the waste flow for disposal. Based on data provided by the Organisation for Economic Cooperation and Development (OECD/Nuclear Energy Agency (NEA, we find an optimal operating period of about 15 years with a flow of 2000 tHM/year.

  11. Effect of sprint training: training once daily versus twice every second day.

    Science.gov (United States)

    Ijichi, Toshiaki; Hasegawa, Yuta; Morishima, Takuma; Kurihara, Toshiyuki; Hamaoka, Takafumi; Goto, Kazushige

    2015-01-01

    This study compared training adaptations between once daily (SINGLE) and twice every second day (REPEATED) sprint training, with same number of training sessions. Twenty physically active males (20.9 ± 1.3 yr) were assigned randomly to the SINGLE (n = 10) or REPEATED (n = 10) group. The SINGLE group trained once per day (5 days per week) for 4 weeks (20 sessions in total). The REPEATED group conducted two consecutive training sessions on the same day, separated by a rest period of 1 h (2-3 days per week) for 4 weeks (20 sessions in total). Each training session consisted of three consecutive 30-s maximal pedalling sets with a 10-min rest between sets. Before and after the training period, the power output during two bouts of 30-s maximal pedalling, exercise duration during submaximal pedalling and resting muscle phosphocreatine (PCr) levels were evaluated. Both groups showed significant increases in peak and mean power output during the two 30-s bouts of maximal pedalling after the training period (P every second day improved OBLA during endurance exercise more than the same training once daily.

  12. Infant Sign Training and Functional Analysis

    Science.gov (United States)

    Normand, Matthew P.; Machado, Mychal A.; Hustyi, Kristin M.; Morley, Allison J.

    2011-01-01

    We taught manual signs to typically developing infants using a reversal design and caregiver-nominated stimuli. We delivered the stimuli on a time-based schedule during baseline. During the intervention, we used progressive prompting and reinforcement, described by Thompson et al. (2004, 2007), to establish mands. Following sign training, we…

  13. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  14. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  15. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  16. Upper respiratory tract infection and mucosal immunity in young ice hockey players during the pre-tournament training period.

    Science.gov (United States)

    Orysiak, Joanna; Witek, Konrad; Malczewska-Lenczowska, Jadwiga; Zembron-Lacny, Agnieszka; Pokrywka, Andrzej; Sitkowski, Dariusz

    2018-02-27

    The aim of this study was to determine the effects of 17 days of training during preparation for the Ice Hockey Under 18 World Championship of the Polish ice hockey national team on the mucosal immune function and monitor upper respiratory tract infection (URTI) incidence before, during and after the competition. Twelve male ice hockey players (age 17.7±0.5 years) were recruited for this study. The first saliva/blood collection took place at the beginning of the training camp (without training at the training camp), the second one was conducted on the 9th day of the training camp immediately after the intensification of training, and the third collection was carried out on the 13th day of training (4 days before leaving for the World Championship) in the tapering phase. To assess the mucosal immune function, concentrations of secretory immunoglobulin A (sIgA), sIgA1, and sIgA2 were analyzed in saliva. Cortisol concentration and creatine kinase activity were determined in blood, as indicators of stress and muscle damage, respectively. The Wisconsin Upper Respiratory Symptom Survey-21 questionnaire was used to assess URTI symptoms. A significant increase in the sIgA1 and sIgA2 concentrations was observed in the third collection compared with the second time point (114.45±33.00 vs 77.49±27.29 and 88.97±25.33 vs 71.65±32.44 U, respectively). There were no statistically significant correlations between the URTI incidence and saliva variables. In conclusion, the tapering period positively affects the mucosal immune function, especially sIgA1 and sIgA2 concentrations, with no significant change in frequency of URTI in young ice hockey players.

  17. A three-week traditional altitude training increases hemoglobin mass and red cell volume in elite biathlon athletes.

    Science.gov (United States)

    Heinicke, K; Heinicke, I; Schmidt, W; Wolfarth, B

    2005-06-01

    It is well known that altitude training stimulates erythropoiesis, but only few data are available concerning the direct altitude effect on red blood cell volume (RCV) in world class endurance athletes during exposure to continued hypoxia. The purpose of this study was to evaluate the impact of three weeks of traditional altitude training at 2050 m on total hemoglobin mass (tHb), RCV and erythropoietic activity in highly-trained endurance athletes. Total hemoglobin mass, RCV, plasma volume (PV), and blood volume (BV) from 6 males and 4 females, all members of a world class biathlon team, were determined on days 1 and 20 during their stay at altitude as well as 16 days after returning to sea-level conditions (800 m, only males) by using the CO-rebreathing method. In males tHb (14.0 +/- 0.2 to 15.3 +/- 1.0 g/kg, p altitude and returned to near sea-level values 16 days after descent. Similarly in females, tHb (13.0 +/- 1.0 to 14.2 +/- 1.3 g/kg, p altitude training period, whereas PV was not altered. In male athletes, plasma erythropoietin concentration increased up to day 4 at altitude (11.8 +/- 5.0 to 20.8 +/- 6.0 mU/ml, p altitude training period, both parameters indicating enhanced erythropoietic activity. In conclusion, we show for the first time that a three-week traditional altitude training increases erythropoietic activity even in world class endurance athletes leading to elevated tHb and RCV. Considering the relatively fast return of tHb and RCV to sea-level values after hypoxic exposure, our data suggest to precisely schedule training at altitude and competition at sea level.

  18. Periodical Cicada--Brood V (Pest Alert)

    Science.gov (United States)

    USDA Forest Service

    1999-01-01

    Three separate species of periodical cicadas, Magicicada septendecim (L.), M. cassini (Fisher), and M. septendecula (Alexander and Moore), will appear this spring over large portions of Ohio and West Virginia during the scheduled Brood V emergence. This brood is the largest that occurs in either state and was last seen in 1982. It will also emerge in the southwest...

  19. Next Generation CANDU: Conceptual Design for a Short Construction Schedule

    International Nuclear Information System (INIS)

    Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville

    2002-01-01

    Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

  20. An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems

    Science.gov (United States)

    Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk

    2013-01-01

    The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices. PMID:23271602

  1. An on-time power-aware scheduling scheme for medical sensor SoC-based WBAN systems.

    Science.gov (United States)

    Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk

    2012-12-27

    The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network-a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.

  2. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  3. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  4. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  5. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  6. Further Examination of the Reliability of the Modified Rathus Assertiveness Schedule.

    Science.gov (United States)

    Del Greco, Linda; And Others

    1986-01-01

    Examined the reliability of the 30-item Modified Rathus Assertiveness Schedule (MRAS) using the test-retest method over a three-week period. The MRAS yielded correlations of .74 using the Pearson product and Spearman Brown correlation coefficient. Correlations for males yielded .77 and .72. For females correlations for both tests were .72.…

  7. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  8. Simulation team training for improved teamwork in an intensive care unit.

    Science.gov (United States)

    Sandahl, Christer; Gustafsson, Helena; Wallin, Carl-Johan; Meurling, Lisbet; Øvretveit, John; Brommels, Mats; Hansson, Johan

    2013-01-01

    This study aims to describe implementation of simulator-based medical team training and the effect of this programme on inter-professional working in an intensive care unit (ICU). Over a period of two years, 90 percent (n = 152) of the staff of the general ICU at Karolinska University Hospital, Huddinge, Sweden, received inter-professional team training in a fully equipped patient room in their own workplace. A case study method was used to describe and explain the planning, formation, and results of the training programme. In interviews, the participants reported that the training had increased their awareness of the importance of effective communication for patient safety. The intervention had even had an indirect impact by creating a need to talk, not only about how to communicate efficaciously, but also concerning difficult care situations in general. This, in turn, had led to regular reflection meetings for nurses held three times a week. Examples of better communication in acute situations were also reported. However, the findings indicate that the observed improvements will not last, unless organisational features such as staffing rotas and scheduling of rounds and meetings can be changed to enable use of the learned behaviours in everyday work. Other threats to sustainability include shortage of staff, overtime for staff, demands for hospital beds, budget cuts, and poor staff communication due to separate meetings for nurses and physicians. The present results broaden our understanding of how to create and sustain an organizational system that supports medical team training.

  9. Effects of U.S. Navy Diver Training on Physiological Parameters, Time of Useful Consciousness and Cognitive Performance During Periods of Normobaric Hypoxia

    Science.gov (United States)

    2014-04-01

    TRAINING ON PHYSIOLOGICAL PARAMETERS, TIME OF USEFULL CONSCIOUSNESS, AND COGNITIVE PERFORMANCE DURING PERIODS OF NORMOBARIC HYPOXIA...Sato, Y. Watanabe, "Time of Usefull Consciousness Determination in Aircrew Members with Rerference to Prior Altitude Chamber Experience and Age

  10. EFFECTIVENESS OF SCHEDULED AMBULATION ON EARLY POSTOPERATIVE OUTCOME AMONG PATIENTS WHO HAVE UNDERGONE ABDOMINAL HYSTERECTOMY

    Directory of Open Access Journals (Sweden)

    Rinku Girija

    2017-01-01

    Full Text Available BACKGROUND Abdominal hysterectomy is one of the most frequently performed surgical procedures in women. The non-ambulatory postoperative period is a high risk period for the development of various complications like wound infection, venous stasis, lower respiratory infection, secondary haemorrhage, deep vein thrombosis, pulmonary embolism, paralytic ileus etc. Prolonged surgery, delayed ambulation and not feeding the patient within 48 hours of surgery are often associated with post-operative morbidity and mortality. This study aims to assess the effectiveness of Scheduled Ambulation on early post-operative outcome among patients undergone abdominal hysterectomy by introduction of Scheduled Ambulation from second day of surgery. MATERIALS AND METHODS Method used is quantitative and quasi experimental post-test control method. Scheduled ambulation technique and pattern were taught pre operatively to 35 patients consecutively selected from general and post-operative ward who formed the experimental group. They were given scheduled ambulation from second to fifth post-operative days and results analysed. Another 35 patients taken as control were given the routine post-operative care. Data Analysis- was performed using SPSS version 17.0. Between group comparisons, quantitative variables analysed by Chisquare test p value >0, 05 considered significant. RESULTS The indication of hysterectomy was fibroid uterus in 80% of the control group and 88, 6% of the experimental group. 51.4% of the hysterectomies were encountered in the age group 40-49 years. There was a statistically significant reduction in the severity of pain, fatigue, postural hypotension and risk for developing Deep vein thrombosis in the experimental group on practicing Scheduled Ambulation from second to fifth post-operative days. CONCLUSION Scheduled ambulation helped the abdominal hysterectomy patients to recover from fatigue, pain, postural hypotension and risk for Deep vein thrombosis

  11. Modulation of whistle production related to training sessions in bottlenose dolphins (Tursiops truncatus) under human care.

    Science.gov (United States)

    Lopez Marulanda, Juliana; Adam, Olivier; Delfour, Fabienne

    2016-11-01

    Bottlenose dolphins are highly social cetaceans with an extensive sound production including clicks, burst-pulsed sounds, and whistles. Some whistles, known as signature whistles, are individually specific. These acoustic signatures are commonly described as being emitted in contexts of stress during forced isolation and as group cohesion calls. Interactions between humans and captive dolphins is largely based on positive reinforcement conditioning within several training/feeding sessions per day. Vocal behavior of dolphins during these interactions might vary. To investigate this, we recorded 10 bottlenose dolphins of Parc Asterix dolphinarium (France) before, during and after 10 training sessions for a total duration of 7 hr and 32 min. We detected 3,272 whistles with 2,884 presenting a quality good enough to be categorized. We created a catalog of whistle types by visual categorization verified by five naive judges (Fleiss' Kappa Test). We then applied the SIGID method to identify the signatures whistles present in our recordings. We found 279 whistles belonging to one of the four identified signature whistle types. The remaining 2,605 were classified as non-signature whistles. The non-signature whistles emission rate was higher during and after the training sessions than before. Emission rate of three signature whistles types significantly increased afterwards as compared to before the training sessions. We suggest that dolphins use their signature whistles when they return to their intraspecific social interactions succeeding scheduled and human-organized training sessions. More observations are needed to make conclusions about the function of signature whistles in relation to training sessions. Zoo Biol. 35:495-504, 2016. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  12. ComprehensiveBench: a Benchmark for the Extensive Evaluation of Global Scheduling Algorithms

    Science.gov (United States)

    Pilla, Laércio L.; Bozzetti, Tiago C.; Castro, Márcio; Navaux, Philippe O. A.; Méhaut, Jean-François

    2015-10-01

    Parallel applications that present tasks with imbalanced loads or complex communication behavior usually do not exploit the underlying resources of parallel platforms to their full potential. In order to mitigate this issue, global scheduling algorithms are employed. As finding the optimal task distribution is an NP-Hard problem, identifying the most suitable algorithm for a specific scenario and comparing algorithms are not trivial tasks. In this context, this paper presents ComprehensiveBench, a benchmark for global scheduling algorithms that enables the variation of a vast range of parameters that affect performance. ComprehensiveBench can be used to assist in the development and evaluation of new scheduling algorithms, to help choose a specific algorithm for an arbitrary application, to emulate other applications, and to enable statistical tests. We illustrate its use in this paper with an evaluation of Charm++ periodic load balancers that stresses their characteristics.

  13. Multiple R&D projects scheduling optimization with improved particle swarm algorithm.

    Science.gov (United States)

    Liu, Mengqi; Shan, Miyuan; Wu, Juan

    2014-01-01

    For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.

  14. The Mucosal Immune Function Is Not Compromised during a Period of High-Intensity Interval Training. Is It Time to Reconsider an Old Assumption?

    Science.gov (United States)

    Born, Dennis-Peter; Zinner, Christoph; Sperlich, Billy

    2017-01-01

    Purpose: The aim of the study was to evaluate the mucosal immune function and circadian variation of salivary cortisol, Immunoglobin-A (sIgA) secretion rate and mood during a period of high-intensity interval training (HIIT) compared to long-slow distance training (LSD). Methods: Recreational male runners (n = 28) completed nine sessions of either HIIT or LSD within 3 weeks. The HIIT involved 4 × 4 min of running at 90–95% of maximum heart rate interspersed with 3 min of active recovery while the LSD comprised of continuous running at 70–75% of maximum heart rate for 60–80 min. The psycho-immunological stress-response was investigated with a full daily profile of salivary cortisol and immunoglobin-A (sIgA) secretion rate along with the mood state on a baseline day, the first and last day of training and at follow-up 4 days after the last day of training. Before and after the training period, each athlete's running performance and peak oxygen uptake (V·O2peak) was determined with an incremental exercise test. Results: The HIIT resulted in a longer time-to-exhaustion (P = 0.02) and increased V·O2peak compared to LSD (P = 0.01). The circadian variation of sIgA secretion rate showed highest values in the morning immediately after waking up followed by a decrease throughout the day in both groups (P HIIT, the wake-up response of sIgA secretion rate was higher on the last day of training (P HIIT and LSD (P HIIT indicates no compromised mucosal immune function compared to LSD and shows the functional adaptation of the mucosal immune system in response to the increased stress and training load of nine sessions of HIIT. PMID:28744226

  15. Multi-objective scheduling of electric vehicles in smart distribution system

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economic operational scheduling of electric vehicles. • The Vehicle to Grid capability and the actual patterns of drivers are considered. • A novel conceptual model for an electric vehicle management system is proposed. - Abstract: When preparing for the widespread adoption of Electric Vehicles (EVs), an important issue is to use a proper EVs’ charging/discharging scheduling model that is able to simultaneously consider economic and environmental goals as well as technical constraints of distribution networks. This paper proposes a multi-objective operational scheduling method for charging/discharging of EVs in a smart distribution system. The proposed multi-objective framework, based on augmented ε-constraint method, aims at minimizing the total operational costs and emissions. The Vehicle to Grid (V2G) capability as well as the actual patterns of drivers are considered in order to generate the Pareto-optimal solutions. The Benders decomposition technique is used in order to solve the proposed optimization model and to convert the large scale mixed integer nonlinear problem into mixed-integer linear programming and nonlinear programming problems. The effectiveness of the proposed resources scheduling approach is tested on a 33-bus distribution test system over a 24-h period. The results show that the proposed EVs’ charging/discharging method can reduce both of operation cost and air pollutant emissions

  16. Multi-objective demand side scheduling considering the operational safety of appliances

    International Nuclear Information System (INIS)

    Du, Y.F.; Jiang, L.; Li, Y.Z.; Counsell, J.; Smith, J.S.

    2016-01-01

    Highlights: • Operational safety of appliances is introduced in multi-objective scheduling. • Relationships between operational safety and other objectives are investigated. • Adopted Pareto approach is compared with Weigh and Constraint approaches. • Decision making of Pareto approach is proposed for final appliances’ scheduling. - Abstract: The safe operation of appliances is of great concern to users. The safety risk increases when the appliances are in operation during periods when users are not at home or when they are asleep. In this paper, multi-objective demand side scheduling is investigated with consideration to the appliances’ operational safety together with the electricity cost and the operational delay. The formulation of appliances’ operational safety is proposed based on users’ at-home status and awake status. Then the relationships between the operational safety and the other two objectives are investigated through the approach of finding the Pareto-optimal front. Moreover, this approach is compared with the Weigh and Constraint approaches. As the Pareto-optimal front consists of a set of optimal solutions, this paper proposes a method to make the final scheduling decision based on the relationships among the multiple objectives. Simulation results demonstrate that the operational safety is improved with the sacrifice of the electricity cost and the operational delay, and that the approach of finding the Pareto-optimal front is effective in presenting comprehensive optimal solutions of the multi-objective demand side scheduling.

  17. Physician satisfaction with a multi-platform digital scheduling system.

    Directory of Open Access Journals (Sweden)

    Rodrigo Octávio Deliberato

    Full Text Available Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation.Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after.51 (77% of the physicians answered the baseline survey. Of those, 32 (63% were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70% of the responders were using more than one method to carry out shift exchanges and only 20 (40% were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73% physicians. Forty-eight (98% of them found the mobile application easy or very easy to install and 47 (96% did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001. The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001.Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  18. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs.

  19. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs

  20. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  1. Effects of in-season short-term aerobic and high-intensity interval training program on repeated sprint ability and jump performance in handball players.

    Science.gov (United States)

    Hermassi, Souhail; Ingebrigtsen, Jørgen; Schwesig, René; Fieseler, Georg; Delank, Karl-Stefan; Chamari, Karim; Shephard, Roy J; Chelly, Mohamed-Souhaiel

    2018-01-01

    This study examined the effects of a 7-week in-season aerobic and high-intensity interval-training program on performance tests linked to successful handball play (e.g., repeated sprint and jumping ability). Thirty participants (age 17.0±1.2 years, body mass 81.1±3.4 kg, height 1.82±0.07 m) performed a Yo-Yo Intermittent Recovery Test level 1 (Yo-Yo IR1), a squat (SJ) and a Countermovement Jump Test (CMJ), as well as a repeated Sprint Ability Test (RSA). From this, maximal aerobic speed (MAS, reached at the end of the Yo-Yo IR1), jumping ability, best time in a single sprint trial (RSAbest), total time (RSATT) and the performance decrement (RSAdec) during all sprints were calculated. Later, subjects were randomly assigned to a control group (CG; N.=15) performing their normal training schedule (5 weekly sessions of ~90 minutes of handball training) or an experimental group (EG; N.=15). The EG performed two 30 min sessions per week of high-intensity aerobic exercises at 100-130% of MAS in addition to their normal training schedule. A significant improvement in MAS (d=4.1), RSAbest (d=1.9), RSATT (d=1.5) and RSAdec (d=2.3) after the training period was demonstrated. Also, significant interaction effects (time x group) were found for all parameters as the EG significantly improved performances in all tests after training. The greatest interaction effects were observed in MAS (η2=0.811) and CMJ (η2=0.759). No relevant changes in test performances were found in the CG (mean d=-0.02). These results indicate that individually speed-controlled aerobic and interval training is effective for improving specific handball performance.

  2. Radiation safety training for accelerator facilities

    International Nuclear Information System (INIS)

    Trinoskey, P.A.

    1997-02-01

    In November 1992, a working group was formed within the U.S. Department of Energy's (DOE's) accelerator facilities to develop a generic safety training program to meet the basic requirements for individuals working in accelerator facilities. This training, by necessity, includes sections for inserting facility-specific information. The resulting course materials were issued by DOE as a handbook under its technical standards in 1996. Because experimenters may be at a facility for only a short time and often at odd times during the day, the working group felt that computer-based training would be useful. To that end, Lawrence Livermore National Laboratory (LLNL) and Argonne National Laboratory (ANL) together have developed a computer-based safety training program for accelerator facilities. This interactive course not only enables trainees to receive facility- specific information, but time the training to their schedule and tailor it to their level of expertise

  3. Importance of Performing Experience in Strength Training Periodization

    Directory of Open Access Journals (Sweden)

    Novosád Adrián

    2017-05-01

    Full Text Available Proper mastering of a training means seems to be an important determinant of the quality of strength training. Aim of the paper is to examine the differences in strength in relation to squat-performing experience and to offer a way of improving performance by means of increasing the quality of squat technique. Methods 1. Subjects were divided into two groups according to their previous experience with performing squat: a group of inexperienced (n = 9; age: 21.1 years ± 2.37; height: 179.2 cm ± 8.18; weight: 70.0 kg ± 7.38 and experienced (n = 9; age: 24.0 years ± 1.07; height: 182.1 cm ± 4.14; weight: 81.2 kg ± 4.29. We carried out a test of maximal isometric strength in deep squat (ISOmax50° and a modified diagnostic set (Fitro Force Plate which consisted of repetitions of heel raised deep squats with a gradually increasing external loading (FmaxBW+(0-100%. Posture and the body segments of the participants were not corrected during these tests. Mann-Whitney U test (α=0.05 was used to evaluate the data obtained. Results 1. After comparing the differences in the maximal value of force curve in dynamic muscular mode (FmaxBW+(0-100% and the maximal isometric force in deep squat (ISOmax50° between the groups we found significantly bigger differences in the group of experienced when the resistance represented +75 % (Δ 279.0 N and +100 % of body weight (Δ 332.2 N. Methods 2. Eleven inexperienced subjects (age: 22.1 years ± 1.52; weight: 78.2 kg ± 2.84 completed a short term experiment (with 4 training sessions in weeklong microcycle. The purpose was to practise deep squat without any content of targeted strength development.

  4. Integer programming of cement distribution by train

    Science.gov (United States)

    Indarsih

    2018-01-01

    Cement industry in Central Java distributes cement by train to meet daily demand in Yogyakarta and Central Java area. There are five destination stations. For each destination station, there is a warehouse to load cements. Decision maker of cement industry have a plan to redesign the infrastructure and transportation system. The aim is to determine how many locomotives, train wagons, and containers and how to arrange train schedules with subject to the delivery time. For this purposes, we consider an integer programming to minimize the total of operational cost. Further, we will discuss a case study and the solution the problem can be calculated by LINGO software.

  5. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    Science.gov (United States)

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.

  6. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  7. Job training planning and design for process plant operators

    International Nuclear Information System (INIS)

    Wirstad, J.

    1983-01-01

    A method is presented by which process plant operators for nuclear power plants are trained in Sweden. It works by a top-down method of systems analysis which can be integrated into the analysis, specification, and design of the process automation system. The training methods can also be adapted to existing automation systems and operating schedules. The author's method is based on the principle that training programs should be based on job requirements, e.g. operator tasks in common, less frequent, and rare operating conditions. Procedures have been tested for the following steps: Job analysis, analysis of knowledge and experience required, analysis of operator training requirements, set-up and organisation of the training programme, achievement control, evaluation of the training programme. (orig./HP) [de

  8. Job training planning and design for process plant operators

    Energy Technology Data Exchange (ETDEWEB)

    Wirstad, J.

    1983-01-01

    A method is presented by which process plant operators for nuclear power plants are trained in Sweden. It works by a top-down method of systems analysis which can be integrated into the analysis, specification, and design of the process automation system. The training methods can also be adapted to existing automation systems and operating schedules. The author's method is based on the principle that training programs should be based on job requirements, e.g. operator tasks in common, less frequent, and rare operating conditions. Procedures have been tested for the following steps: Job analysis, analysis of knowledge and experience required, analysis of operator training requirements, set-up and organisation of the training programme, achievement control, evaluation of the training programme.

  9. Basic Botany On-Line: A Training Tool for the Master Gardener Program.

    Science.gov (United States)

    VanDerZanden, Ann Marie; Rost, Bob; Eckel, Rick

    2002-01-01

    A noncredit, online training module on botany was offered to participants in the Oregon Master Gardener program. The 48 participants felt the module was a useful training tool. They also noted that the convenience of completing the material at their own pace and during a time that fit into their schedule. (SK)

  10. The ACR: Advanced design features for a short construction schedule

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.

    2003-01-01

    Building on the successful CANDU construction at Qinshan, the ACR-700 is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. A project schedule of 48 months has been developed for the nth ACR unit with a 36 months construction period from First Concrete to Fuel Load. This paper describes some of the advanced design features implemented in the reactor building design in order to achieve this short construction period. These features include large volume concrete pours, prefabricated rebar, composite structures, prefabricated permanent formwork and significant modularization and prefabrication

  11. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  12. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  13. Exact Methods for Solving the Train Departure Matching Problem

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Bull, Simon Henry

    In this paper we consider the train departure matching problem which is an important subproblem of the Rolling Stock Unit Management on Railway Sites problem introduced in the ROADEF/EURO Challenge 2014. The subproblem entails matching arriving train units to scheduled departing trains at a railway...... site while respecting multiple physical and operational constraints. In this paper we formally define that subproblem, prove its NP- hardness, and present two exact method approaches for solving the problem. First, we present a compact Mixed Integer Program formulation which we solve using a MIP solver...

  14. Sustained effect of resistance training on blood pressure and hand grip strength following a detraining period in elderly hypertensive women: a pilot study

    Directory of Open Access Journals (Sweden)

    Nascimento D da C

    2014-01-01

    Full Text Available Dahan da Cunha Nascimento,1,5,8 Ramires Alsamir Tibana,1,8 Franklin M Benik,2 Keila Elizabeth Fontana,3 Frederico Ribeiro Neto,8 Frederico Santos de Santana,5,8 Leopoldo Santos-Neto,4 Renato André Sousa Silva,1,5,6 Alessandro Oliveira Silva,1,7 Darlan Lopes Farias,1,7 Sandor Balsamo,4,5,8 Jonato Prestes1 1Postgraduate Program in Physical Education, Catholic University of Brasilia, Brasilia, Brazil; 2Department of Kinesiology and Sports Studies Graduate Program, Eastern Illinois University, Charleston, IL, USA; 3Faculty of Physical Education, University of Brasilia, Brasilia, Brazil; 4Graduate Program in Medical Sciences of the University of Brasilia, School of Medicine and Rheumatology Service, University Hospital of Brasilia (HUB, Brasilia, Brazil; 5Department of Physical Education, University Center Euro American University Center, Brasilia, Brazil; 6Center of Excellence in Medicine of Exercise (CEMEx, Brasilia, Brazil; 7Center University of Brasilia (UNICEUB, Brasilia, Brazil; 8Strength Training and Health Research Group (GEPEEFS, Brasilia, Brazil Introduction: Hypertension is the most prevalent modifiable risk factor with a high prevalence among older adults. Exercise is a nonpharmacological treatment shown to benefit all patients with hypertension. Objective: This study examined the effects of a 14-week moderate intensity resistance training program (RT on the maintenance of blood pressure and hand grip strength during an extended detraining period in elderly hypertensive women. Methods: Twelve hypertensive sedentary elderly women completed 14 weeks of whole body RT at a moderate perceived exertion following a detraining period of 14 weeks. Results: Following the training period, participants demonstrated an increase in absolute hand grip strength (P=0.001, relative hand grip strength (P=0.032 and a decrease of systolic (P=0.001, diastolic (P=0.008, and mean blood pressure (P=0.002 when compared to pre-exercise values. In addition, these

  15. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  16. Influencing Trust for Human-Automation Collaborative Scheduling of Multiple Unmanned Vehicles.

    Science.gov (United States)

    Clare, Andrew S; Cummings, Mary L; Repenning, Nelson P

    2015-11-01

    We examined the impact of priming on operator trust and system performance when supervising a decentralized network of heterogeneous unmanned vehicles (UVs). Advances in autonomy have enabled a future vision of single-operator control of multiple heterogeneous UVs. Real-time scheduling for multiple UVs in uncertain environments requires the computational ability of optimization algorithms combined with the judgment and adaptability of human supervisors. Because of system and environmental uncertainty, appropriate operator trust will be instrumental to maintain high system performance and prevent cognitive overload. Three groups of operators experienced different levels of trust priming prior to conducting simulated missions in an existing, multiple-UV simulation environment. Participants who play computer and video games frequently were found to have a higher propensity to overtrust automation. By priming gamers to lower their initial trust to a more appropriate level, system performance was improved by 10% as compared to gamers who were primed to have higher trust in the automation. Priming was successful at adjusting the operator's initial and dynamic trust in the automated scheduling algorithm, which had a substantial impact on system performance. These results have important implications for personnel selection and training for futuristic multi-UV systems under human supervision. Although gamers may bring valuable skills, they may also be potentially prone to automation bias. Priming during training and regular priming throughout missions may be one potential method for overcoming this propensity to overtrust automation. © 2015, Human Factors and Ergonomics Society.

  17. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  18. Discontinuous Schedule of Bevacizumab in Colorectal Cancer Induces Accelerated Tumor Growth and Phenotypic Changes

    Directory of Open Access Journals (Sweden)

    Selma Becherirat

    2018-04-01

    Full Text Available Antiangiogenics administration in colorectal cancer patients seemed promising therapeutic approach. Inspite of early encouraging results, it however gave only modest clinical benefits. When AAG was administered with discontinuous schedule, the disease showed acceleration in certain cases. Though resistance to AAG has been extensively studied, it is not documented for discontinuous schedules. To simulate clinical situations, we subjected a patient-derived CRC subcutaneous xenograft in mice to three different protocols: 1 AAG (bevacizumab treatment for 30 days (group A (group B was the control, 2 bevacizumab treatment for 50 days (group C and bevacizumab for 30 days and 20 without treatment (group D, and 3 bevacizumab treatment for 70 days (group E and 70 days treatment with a drug-break period between day 30 and 50 (group F. The tumor growth was monitored, and at sacrifice, the vascularity of tumors was measured and the proangiogenic factors quantified. Tumor phenotype was studied by quantifying cancer stem cells. Interrupting bevacizumab during treatment accelerated tumor growth and revascularization. A significant increase of proangiogenic factors was observed when therapy was stopped. On withdrawal of bevacizumab, as also after the drug-break period, the plasmatic VEGF increased significantly. Similarly, a notable increase of CSCs after the withdrawal and drug-break period of bevacizumab was observed (P<.01. The present study indicates that bevacizumab treatment needs to be maintained because discontinuous schedules tend to trigger tumor regrowth, and increase tumor resistance and CSC heterogeneity.

  19. The Use of Player-centered Positive Reinforcement to Schedule In-game Rewards Increases Enjoyment and Performance in a Serious Game

    Directory of Open Access Journals (Sweden)

    Aniket Nagle

    2014-10-01

    Full Text Available Among the methods used to increase enjoyment and performance in serious games, reward schedules, i.e., determining when in-game rewards should be given, have not been sufficiently explored. In the present study, we designed a simple memory training serious game and compared two methods of scheduling rewards, both based on the paradigm of positive reinforcement: fixed ratio schedule, in which rewards were given after a fixed number of correct responses, and variable ratio schedule, in which rewards were given after an unpredictable number of correct responses. To account for the variability in player preference for rewards, a player-centered sub-mode was included in both schedules by adjusting the schedule ratio according to player preference for rewards. The effectiveness of this approach was tested by comparing it against two more sub-modes: one which used a predetermined ratio, and another which set the ratio to the opposite of player preference. The game was put online and tested with 210 participants. Enjoyment, performance, duration of gameplay, and likelihood to play again were significantly higher in the player-centered sub-mode than the other sub-modes. On average, the variable-ratio schedule was better in the outcome measures than the fixed-ratio schedule. The results highlight the importance of in-game rewards, and indicate that giving rewards according to a player-centered variable-ratio schedule has the potential to make serious games more effective.

  20. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  1. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  2. 18 CFR 225.3 - Schedule of records and periods of retention.

    Science.gov (United States)

    2010-04-01

    .... Accountants' and auditors' reports. Information Technology Management 5. Automatic data processing records.... 33. Revenue summaries. Tax 34. Tax records. Treasury 35. Statements of funds and deposits. 36... periods as contracts to which they relate. 4. Accountants' and auditors' reports: (a) Reports of...

  3. k-Shortest routing of trains on shunting yards

    NARCIS (Netherlands)

    Riezebos, Jan; van Wezel, Wout

    2009-01-01

    We consider the problem of designing algorithmic support for k-best routing decisions in train shunting scheduling. A study at the Netherlands Railways revealed that planners like to interact with the solution process of finding suitable routes. Two types of interaction were required: the

  4. Review of energy-efficient train control and timetabling

    NARCIS (Netherlands)

    Scheepmaker, G.M.; Goverde, R.M.P.; Kroon, LG

    2016-01-01

    The energy consumption of trains is highly efficient due to the low friction between steel wheels and rails, although the efficiency is also influenced largely by the driving strategy applied and the scheduled running times in the timetable. Optimal energy-efficient driving strategies can reduce

  5. Training and the European Working Time Directive: a 7 year review of paediatric anaesthetic trainee caseload data.

    Science.gov (United States)

    Fernandez, E; Williams, D G

    2009-10-01

    The implementation of the European Working Time Directive (WTD) has reduced the hours worked by trainees in the UK to a maximum of 56 h per week. With a further and final reduction to 48 h per week scheduled for August 2009, there is concern amongst doctors about the impact on training and on patient care. Paediatric anaesthesia is one of the specialist areas of anaesthesia for which the Royal College of Anaesthetists (RCoA) recommends a minimum caseload during the period of advanced training. We conducted a retrospective analysis of theatre logbook data from 62 Specialist Registrars (SpRs) who had completed a 12 month period of advanced training in paediatric anaesthesia in our institution between 2000 and 2007. After the implementation of the WTD 56 h week in 2004, the mean total number of cases performed by SpRs per year decreased from 441 to 336, a 24% reduction. We found a statistically significant reduction across all age groups with the largest reduction in the under 1 month of age group. The post-WTD group did not meet the RCoA recommended total minimum caseload or the minimum number of cases of <1 yr of age. Since the implementation of the WTD, there has been a significant reduction in the number of cases performed by SpRs in paediatric anaesthesia and they are no longer achieving the RCoA recommended minimum numbers for advanced training.

  6. An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems

    Directory of Open Access Journals (Sweden)

    Jung-Guk Kim

    2012-12-01

    Full Text Available The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD, which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time and the power consumption optimization. The scheduler was embedded into a system on chip (SoC developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.

  7. 78 FR 58342 - Proposed Fee Schedule for Commercial Filming and Still Photography Permits

    Science.gov (United States)

    2013-09-23

    ... for Commercial Filming and Still Photography Permits AGENCY: Office of the Secretary, Bureau of Land... still photography conducted on public lands under their jurisdiction. The additional comment period is... proposed location fee schedule to establish land-use fees for commercial filming and still photography that...

  8. The effects of intensified training on resting metabolic rate (RMR), body composition and performance in trained cyclists

    Science.gov (United States)

    Lundy, Bronwen; Rogers, Margot A.; Welvaert, Marijke; Halson, Shona; McKune, Andrew

    2018-01-01

    Background Recent research has demonstrated decreases in resting metabolic rate (RMR), body composition and performance following a period of intensified training in elite athletes, however the underlying mechanisms of change remain unclear. Therefore, the aim of the present study was to investigate how an intensified training period, designed to elicit overreaching, affects RMR, body composition, and performance in trained endurance athletes, and to elucidate underlying mechanisms. Method Thirteen (n = 13) trained male cyclists completed a six-week training program consisting of a “Baseline” week (100% of regular training load), a “Build” week (~120% of Baseline load), two “Loading” weeks (~140, 150% of Baseline load, respectively) and two “Recovery” weeks (~80% of Baseline load). Training comprised of a combination of laboratory based interval sessions and on-road cycling. RMR, body composition, energy intake, appetite, heart rate variability (HRV), cycling performance, biochemical markers and mood responses were assessed at multiple time points throughout the six-week period. Data were analysed using a linear mixed modeling approach. Results The intensified training period elicited significant decreases in RMR (F(5,123.36) = 12.0947, p = HRV (F(2,22.608) = 6.5212, p = 0.005); all of which improved following a period of recovery. A state of overreaching was induced, as identified by a reduction in anaerobic performance (F(5,121.87) = 8.2622, p = HRV during intensified training periods may alleviate fatigue and attenuate the observed decrease in RMR, providing more optimal conditions for a positive training adaptation. PMID:29444097

  9. IAEA training course series TCS-37 clinical training of medical physicists specializing in radiation oncology

    International Nuclear Information System (INIS)

    Inamura, Kiyonari

    2015-01-01

    Training program IAEA TCS-37 (Training course series No.37) 'Clinical Training Specializing in Radiation Oncology (2009)' was fixed to practical training syllabus at faculty and graduate course of medical physics of a university. TCS-47 for diagnostic radiology (2010) and TCS-50 for nuclear medicine (2011) were also involved in the syllabus. These training courses had been developed by IAEA RCA RAS6038 project since 2002. In this paper, first, comparison with other training programs in the world was made in terms of (1) Degree of extent of subject or field, (2) Concreteness or specificity, (3) Degree of completion, (4) Method of certification and (5) Practicability. IAEA TCS series got the most points among ten programs such as EMERALD/EMIT, AAPM rpt. No.90 and CAMPEP accredited programs. Second, TCS-37, TCS-47 and TCS-50 were broken down to 6, 5 and 6 subjects of training course respectively. Third, each subject was further broken down to 15 times of training schedule where every time was composed by 3 hours of training. Totally 45 hours of a subject were assigned to one semester for getting one unit of credit. Seventeen units should be credited up to three years in graduate course to finish the whole program. (author)

  10. Study of junior weight lifters’ special fitness with different methods of speed-power training in preparatory period of general preparatory stage

    Directory of Open Access Journals (Sweden)

    O. B. Piven

    2015-09-01

    Full Text Available Purpose: studying of junior weight lifters’ special fitness in preparatory period of general preparatory stage. Material: 30 junior weight lifters of 12 - 14 years’ old age were involved in experiment (2 nd and 3 rd sport grades. Results: optimal indicators of training by shock method have been determined for sportsmen of experimental group. Scope of loads was: squats with barbell on shoulders - lifting 779 times (90 tons; 310 jumps in depth and jumps out. Power indicators in total of combined exercises have increased by 16.5 kg. In control group other methodic was used. In control group scope of loads was: lifting of barbell - 910 times (111 tons. Power indicators in total of combined exercises have increased by 7.2 kg. Conclusions: the following regiment of training is recommended: first 3 weeks - jumps. Dozing and load scopes shall be as follows: first two trainings - two attempts (10 times each with height of 0.5 m; third training - 3 attempts (10 times each with height of 0.5 m; forth training - 4 attempts (10 times each with height of 0.7 m. Jumps in depth shall be used 3 times weekly.

  11. Scheduling home appliances for energy efficient buildings

    DEFF Research Database (Denmark)

    Rossello Busquet, Ana; Kardaras, Georgios; Iversen, Villy Bæk

    2010-01-01

    The number of appliances found in users’ homes is increasing together with electricity consumption of users’ residences. In addition, there is a tendency to consume during the same period leading to demand peaks. During these periods, electricity providers are forced to develop costly methods...... to generate enough power to meet consumers’ requirements. In addition, high demand peaks can lead to electricity shortages or even blackouts in certain areas. In order to avoid demand peaks, users’ appliances should consume electricity in a more distributed way. A new methodology to schedule the usage of home...... appliances is proposed and analyzed. The main concept behind this approach is the aggregation of home appliances into priority classes and the definition of a maximum power consumption threshold, which is not allowed to be exceeded during peak hours. The scenario simulated describes a modern household, where...

  12. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  13. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  14. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  15. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  16. Revision of nuclear power plants safety systems' routine testing assigned periodicity during the design extension period

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kozlov, Yi.L.; Chulkyin, O.O.

    2017-01-01

    When nuclear power plants safety systems thermal equipment operation extending, a necessary requirement shall rely on revising the scheduled equipment tests frequency to optimize those tests schedule taking into account the equipment remained lifespan. On the one hand, there exists a need for tests frequency increase to detect ''hidden'' failures, and on the another, frequent tests cause a premature wear of the equipment. Proposed is an original method for optimizing the frequency of NPPs safety systems thermal engineering equipment testing. Essential in the proposed method is the optimization criterion chosen: index of security system failure probability non-exceedance during the beyond-design operating period as referred to the failure probability expected considering the equipment residual resource during the design operating period. The developed method implementation when applied to NPPs safety systems operated beyond the design service life at nuclear power plants with WWER-1000 series reactors, allowed to establish that the optimal tests frequency makes half the designed one when the equipment service life is extended by five years and three times less that the designed frequency when subject lifespan extended by 10 years.

  17. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  18. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  19. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  20. Train operation in emergencies

    CERN Document Server

    Jia, Limin; Qin, Yong

    2017-01-01

    This book presents the latest findings on train operation theories and methods in the context of emergencies. It examines and assesses a range of aspects—including the definition of a railway emergency, transport organization modes in emergencies, calculating railway transport capacity in emergencies, line planning in emergencies, train re-pathing in emergencies and train re-scheduling in emergencies—that are urgently needed in the railway transportation field, which faces the serious challenge of dealing with emergencies worldwide. The book highlights the latest research results in an integrated and systematic way, and the methodology presented is oriented on real-world problems, allowing it to be used not only directly in railway operational management, but also as the point of departure for further applications or theoretical research. As such, the book will be of considerable interest to graduate students and researchers in the field of traffic and transportation engineering.>.

  1. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  2. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  3. Effect of reinforcer magnitude on performance maintained by progressive-ratio schedules.

    Science.gov (United States)

    Rickard, J F; Body, S; Zhang, Z; Bradshaw, C M; Szabadi, E

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6-300 microl. Overall response rates in successive ratios conformed to a bitonic equation derived from Killeen's (1994) Mathematical Principles of Reinforcement. The "specific activation" parameter, a, which is presumed to reflect the incentive value of the reinforcer, was a monotonically increasing function of reinforcer volume; the "response time" parameter, delta, which defines the minimum response time, increased as a function of reinforcer volume; the "currency" parameter, beta, which is presumed to reflect the coupling of responses to the reinforcer, declined as a function of volume. Running response rate (response rate calculated after exclusion of the postreinforcement pause) decayed monotonically as a function of ratio size; the index of curvature of this function increased as a function of reinforcer volume. Postreinforcement pause increased as a function of ratio size. Estimates of a derived from overall response rates and postreinforcement pauses showed a modest positive correlation across conditions and between animals. Implications of the results for the quantification of reinforcer value and for the use of progressive-ratio schedules in behavioral neuroscience are discussed.

  4. CERN Technical Training Programme: Learning for the LHC!

    CERN Multimedia

    2003-01-01

    In collaboration with AS and AC divisions, the Technical Training Programme is launching EVM Hands-on Tutorials specifically designed for those people involved in the current EVM for LHC exercise. The goal of the EVM Hands-on Training Sessions is to provide insight in Earned Value Management as implemented at CERN. Following this course will enable you to understand the EVM methodology, the tools used at CERN, the procedures used for the data-collection and data-reporting and assist you in analysing cost & schedule variances. The course is an intensive 2-hour 'hands-on' training session. If you are interested in this course, please discuss with your supervisor or your DTO. More information and online registration by EDH are available from the Technical Training web pages: http://www.cern.ch/TechnicalTraining/

  5. CERN Technical Training Programme: Learning for the LHC !

    CERN Multimedia

    2003-01-01

    In collaboration with AS and AC divisions, the Technical Training Programme is launching EVM Hands-on Tutorials specifically designed for those people involved in the current EVM for LHC exercise. The goal of the EVM Hands-on Training Sessions is to provide insight in Earned Value Management as implemented at CERN. Following this course will enable you to understand the EVM methodology, the tools used at CERN, the procedures used for the data-collection and data-reporting and assist you in analysing cost & schedule variances. The course is an intensive 2-hour 'hands-on' training session. If you are interested in this course, please discuss with your supervisor or your DTO. More information and online registration by EDH are available from the Technical Training web pages: http://www.cern.ch/TechnicalTraining/

  6. Optimization methods for the Train Unit Shunting Problem

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Lusby, Richard Martin; Wagenaar, Joris Camiel

    2017-01-01

    We consider the Train Unit Shunting Problem, an important planning problem for passenger railway operators. This problem entails assigning train units from shunting yards to scheduled train services in such a way that the resulting operations are without conflicts. The problem arises at every...... shunting yard in the railway network and involves matching train units to arriving and departing train services as well as assigning the selected matchings to appropriate shunting yard tracks. We present an extensive comparison benchmark of multiple solution approaches for this problem, some of which...... are novel. In particular, we develop a constraint programming formulation, a column generation approach, and a randomized greedy heuristic. We compare and benchmark these approaches with two existing methods, a mixed integer linear program and a two-stage heuristic. The benchmark contains multiple real...

  7. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  8. An Extended Genetic Algorithm for Distributed Integration of Fuzzy Process Planning and Scheduling

    Directory of Open Access Journals (Sweden)

    Shuai Zhang

    2016-01-01

    Full Text Available The distributed integration of process planning and scheduling (DIPPS aims to simultaneously arrange the two most important manufacturing stages, process planning and scheduling, in a distributed manufacturing environment. Meanwhile, considering its advantage corresponding to actual situation, the triangle fuzzy number (TFN is adopted in DIPPS to represent the machine processing and transportation time. In order to solve this problem and obtain the optimal or near-optimal solution, an extended genetic algorithm (EGA with innovative three-class encoding method, improved crossover, and mutation strategies is proposed. Furthermore, a local enhancement strategy featuring machine replacement and order exchange is also added to strengthen the local search capability on the basic process of genetic algorithm. Through the verification of experiment, EGA achieves satisfactory results all in a very short period of time and demonstrates its powerful performance in dealing with the distributed integration of fuzzy process planning and scheduling (DIFPPS.

  9. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  10. Training programming: revisiting terminology

    Directory of Open Access Journals (Sweden)

    Mário C. Marques

    2017-11-01

    Full Text Available Does the way the literature presents the classic periodization or programming make sense? In our opinion, the answer is clearly no. To get started, periodization and programming are terms used interchangeably (as synonyms in scientific literature when they actually have different meanings. Thus, to periodize is to set periods for a process (e.g., to a season or the sports life, whereas programming is defined as to devise and order the necessary actions to carry out a project. Accordingly, coaches and physical conditioning professionals should divide or periodize the season in different cycles and then, within each cycle, programming the training sessions. The periodization should not only help to structure the training process, but also to express the goals to achieve, to control the training process evolution and allow a great execution of the action plan. When designing a plan, we simply organize all the “ingredients” that should be part of the work/training design in a concrete and detailed way. From a scientific point of view, the programming is nothing more than an adequate interpretation of the training biological laws (Tschione, 1992; Latonov, 1997, Issurin, 2008 and must have the performance improvement as the major reference criteria (Issurin 2010. In practice, during the last decades, we have followed a set of instructions mainly based on experienced coaches (Matveyev, 1981, Bompa, 1994, Zatsiorsky, 1995 who have obtained relevant results. As a consequence, it is very difficult to accept another solid scientific based vision or proposal since the accumulation of systematic experiences has led to the construction of a theoretical model, even though there are no scientific evidences. The multiplication and implementation of the traditional programming models (Matveyev, 1981, Bompa, 1994 have guided us to a set of erroneous terms, among which we highlight the “micro”, the “meso” and the “macro” cycles, that were never

  11. THE EFFECTS OF INCOME, GENDER, AGE, EDUCATION, WORKING PERIOD, INSURANCE, TRAINING, AND WORKER STATUS ON OUTSOURCED AND WORKERS PERFORMANCE IN SOUTH SUMATERA IN MANUFACTURING COMPANIES

    OpenAIRE

    Ratna Juwita; Nurlina Tarmizi; Didik Susetyo; Bambang Bemby Soebyakto

    2017-01-01

    This research investigated the effects of income, gender, age, education, working period, insurance, training and workers’ status (outsourcing or permanent) on performance. The result showed that gender, education, insurance, training and status had positive and significant effect on performace. Income had significant and negative effect on performance, the increased income would decrease performance. Age had positive but not significant effect, the increased age would decrease...

  12. Quality assurance in postgraduate pathology training the Dutch way: regular assessment, monitoring of training programs but no end of training examination.

    Science.gov (United States)

    van der Valk, Paul

    2016-01-01

    It might seem self-evident that in the transition from a supervised trainee to an independent professional who is no longer supervised, formal assessment of whether the trainee knows his/her trade well enough to function independently is necessary. This would then constitute an end of training examination. Such examinations are practiced in several countries but a rather heterogeneous situation exists in the EU countries. In the Netherlands, the training program is not concluded by a summative examination and reasons behind this situation are discussed. Quality assurance of postgraduate medical training in the Netherlands has been developed along two tracks: (1) not a single testing moment but continuous evaluation of the performance of the trainee in 'real time' situations and (2) monitoring of the quality of the offered training program through regular site-visits. Regular (monthly and/or yearly) evaluations should be part of every self-respecting training program. In the Netherlands, these evaluations are formative only: their intention is to provide the trainee a tool by which he or she can see whether they are on track with their training schedule. In the system in the Netherlands, regular site-visits to training programs constitute a crucial element of quality assurance of postgraduate training. During the site-visit, the position and perceptions of the trainee are key elements. The perception by the trainee of the training program, the institution (or department) offering the training program, and the professionals involved in the training program is explicitly solicited and systematically assessed. With this two-tiered approach high-quality postgraduate training is assured without the need for an end of training examination.

  13. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  14. Load training athletes specializing in race to 100 meter hurdles in its annual training cycle

    Directory of Open Access Journals (Sweden)

    Radosław Muszkieta

    2016-10-01

    Full Text Available The aim of the study was to provide an annual macrocycle preparation of athletes specializing in the 100 meters hurdles. A detailed discussion of the structure and analyze loads in individual periods of the annual training cycle. And the analysis and discussion of the variables of training athletes Marlene Morton, who allowed her to win the bronze medal Polish Youth Championships in Bialystok. The study was conducted based on a detailed analysis of the training diary kept by the athlete, the coach and the daily interview with the coach conducting Arthur Kohutek. They were presented various training periods and analyzed periods and sub-periods. In the summary they presented the conclusions that can be helpful when planning the burden for athletes who specialize in racing gossip.

  15. Formulation for less master production schedule instability under rolling horizon

    OpenAIRE

    Herrera , Carlos; Thomas , André

    2009-01-01

    International audience; In Manufacturing Planning and Control Systems, the Master Production Schedule (MPS) makes a link between tactical and operational levels, taking into account information provided by end items, demand forecast as well as Sales and Operations Planning (S&OP) suggestions. Therefore, MPS plays an important role to maintain an adequate customers service level and an efficient production system. In a rolling planning horizon, MPS is periodically computed over whole operation...

  16. Economic-environmental energy and reserve scheduling of smart distribution systems: A multiobjective mathematical programming approach

    International Nuclear Information System (INIS)

    Zakariazadeh, Alireza; Jadid, Shahram; Siano, Pierluigi

    2014-01-01

    Highlights: • Environmental/economical scheduling of energy and reserve. • Simultaneous participation of loads in both energy and reserve scheduling. • Aggregate wind generation and demand uncertainties in a stochastic model. • Stochastic scheduling of energy and reserve in a distribution system. • Demand response providers’ participation in energy and reserve scheduling. - Abstract: In this paper a stochastic multi-objective economical/environmental operational scheduling method is proposed to schedule energy and reserve in a smart distribution system with high penetration of wind generation. The proposed multi-objective framework, based on augmented ε-constraint method, is used to minimize the total operational costs and emissions and to generate Pareto-optimal solutions for the energy and reserve scheduling problem. Moreover, fuzzy decision making process is employed to extract one of the Pareto-optimal solutions as the best compromise non-dominated solution. The wind power and demand forecast errors are considered in this approach and the reserve can be furnished by the main grid as well as distributed generators and responsive loads. The consumers participate in both energy and reserve markets using various demand response programs. In order to facilitate small and medium loads participation in demand response programs, a Demand Response Provider (DRP) aggregates offers for load reduction. In order to solve the proposed optimization model, the Benders decomposition technique is used to convert the large scale mixed integer non-linear problem into mixed-integer linear programming and non-linear programming problems. The effectiveness of the proposed scheduling approach is verified on a 41-bus distribution test system over a 24-h period

  17. Investigating the Effect of Voltage-Switching on Low-Energy Task Scheduling in Hard Real-Time Systems

    National Research Council Canada - National Science Library

    Swaminathan, Vishnu; Chakrabarty, Krishnendu

    2005-01-01

    We investigate the effect of voltage-switching on task execution times and energy consumption for dual-speed hard real-time systems, and present a new approach for scheduling workloads containing periodic tasks...

  18. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  19. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  20. CERN Technical Training 2007: IT3T - IT Technical Training Tutorials (Autumn 2007)

    CERN Multimedia

    2007-01-01

    CERN Technical Training and the Internet Services group of the IT department (IT/IS) are jointly organizing a series of free tutorials, addressing some topics of common interest: the IT Technical Training Tutorials (IT3T). The first IT3T series will be offered in October 2007, in French, with the following schedule: IT3T/2007/1 "Introduction to Collaboration Workspaces using SharePoint", October 23rd , 14:30-16:00, Alexandre Lossent IT3T/2007/2 "What is new in Office 2007", October 25th, 14:30-15:30, Emmanuel Ormancey IT3T/2007/3 "Working with Windows Vista at CERN", October 30th, 14:30-15:30, Michal Kwiatek IT3T/2007/4 "Read your mail and more with Outlook 2007", November 1st, 14:30-15:30, Sebastien Dellabella All IT Technical Training Tutorials will take place in the Training Centre Auditorium (building 593, room 11), at 14h30. The tutorials are free of charge, but separate registration to each is required. Participation to any of the tutorials is open: attendance to any ...

  1. Design and Evaluation of the Terminal Area Precision Scheduling and Spacing System

    Science.gov (United States)

    Swenson, Harry N.; Thipphavong, Jane; Sadovsky, Alex; Chen, Liang; Sullivan, Chris; Martin, Lynne

    2011-01-01

    This paper describes the design, development and results from a high fidelity human-in-the-loop simulation of an integrated set of trajectory-based automation tools providing precision scheduling, sequencing and controller merging and spacing functions. These integrated functions are combined into a system called the Terminal Area Precision Scheduling and Spacing (TAPSS) system. It is a strategic and tactical planning tool that provides Traffic Management Coordinators, En Route and Terminal Radar Approach Control air traffic controllers the ability to efficiently optimize the arrival capacity of a demand-impacted airport while simultaneously enabling fuel-efficient descent procedures. The TAPSS system consists of four-dimensional trajectory prediction, arrival runway balancing, aircraft separation constraint-based scheduling, traffic flow visualization and trajectory-based advisories to assist controllers in efficient metering, sequencing and spacing. The TAPSS system was evaluated and compared to today's ATC operation through extensive series of human-in-the-loop simulations for arrival flows into the Los Angeles International Airport. The test conditions included the variation of aircraft demand from a baseline of today's capacity constrained periods through 5%, 10% and 20% increases. Performance data were collected for engineering and human factor analysis and compared with similar operations both with and without the TAPSS system. The engineering data indicate operations with the TAPSS show up to a 10% increase in airport throughput during capacity constrained periods while maintaining fuel-efficient aircraft descent profiles from cruise to landing.

  2. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  3. Astronaut Scott Parazynski during egress training

    Science.gov (United States)

    1994-01-01

    Astronaut Scott E. Parazynski looks at fellow STS-66 mission specialist Joseph R. Tanner, (foreground) during a rehearsal of procedures to be followed during the launch and entry phases of their scheduled November 1994 flight. This rehearsal, held in the crew compartment trainer (CCT) of JSC's Shuttle mockup and integration laboratory, was followed by a training session on emergency egress procedures.

  4. Cleaning Schedule Operations in Heat Exchanger Networks

    Directory of Open Access Journals (Sweden)

    Huda Hairul

    2018-01-01

    Full Text Available Heat exchanger networks have been known to be the essential parts in the chemical industries. Unfortunately, since the performance of heat exchanger can be decreasing in transferring the heat from hot stream into cold stream due to fouling, then cleaning the heat exchanger is needed to restore its initial performance periodically. A process of heating crude oil in a refinery plant was used as a case study. As many as eleven heat exchangers were used to heat crude oil before it was heated by a furnace to the temperature required to the crude unit distillation column. The purpose of this study is to determine the cleaning schedule of heat exchanger on the heat exchanger networks due to the decrease of the overall heat transfer coefficient by various percentage of the design value. A close study on the process of heat exchanger cleaning schedule in heat exchanger networks using the method of decreasing overall heat transfer coefficient as target. The result showed that the higher the fouling value the more often the heat exchanger is cleaned because the overall heat transfer coefficient decreases quickly.

  5. An Improved Walk Model for Train Movement on Railway Network

    International Nuclear Information System (INIS)

    Li Keping; Mao Bohua; Gao Ziyou

    2009-01-01

    In this paper, we propose an improved walk model for simulating the train movement on railway network. In the proposed method, walkers represent trains. The improved walk model is a kind of the network-based simulation analysis model. Using some management rules for walker movement, walker can dynamically determine its departure and arrival times at stations. In order to test the proposed method, we simulate the train movement on a part of railway network. The numerical simulation and analytical results demonstrate that the improved model is an effective tool for simulating the train movement on railway network. Moreover, it can well capture the characteristic behaviors of train scheduling in railway traffic. (general)

  6. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  7. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  8. An Agent-Based Solution Framework for Inter-Block Yard Crane Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Omor Sharif

    2012-06-01

    Full Text Available The efficiency of yard operations is critical to the overall productivity of a container terminal because the yard serves as the interface between the landside and waterside operations. Most container terminals use yard cranes to transfer containers between the yard and trucks (both external and internal. To facilitate vessel operations, an efficient work schedule for the yard cranes is necessary given varying work volumes among yard blocks with different planning periods. This paper investigated an agent-based approach to assign and relocate yard cranes among yard blocks based on the forecasted work volumes. The goal of our study is to reduce the work volume that remains incomplete at the end of a planning period. We offered several preference functions for yard cranes and blocks which are modeled as agents. These preference functions are designed to find effective schedules for yard cranes. In addition, we examined various rules for the initial assignment of yard cranes to blocks. Our analysis demonstrated that our model can effectively and efficiently reduce the percentage of incomplete work volume for any real-world sized problem.

  9. "The stone which the builders rejected...": Delay of reinforcement and response rate on fixed-interval and related schedules.

    Science.gov (United States)

    Wearden, J H; Lejeune, Helga

    2006-02-28

    The article deals with response rates (mainly running and peak or terminal rates) on simple and on some mixed-FI schedules and explores the idea that these rates are determined by the average delay of reinforcement for responses occurring during the response periods that the schedules generate. The effects of reinforcement delay are assumed to be mediated by a hyperbolic delay of reinforcement gradient. The account predicts that (a) running rates on simple FI schedules should increase with increasing rate of reinforcement, in a manner close to that required by Herrnstein's equation, (b) improving temporal control during acquisition should be associated with increasing running rates, (c) two-valued mixed-FI schedules with equiprobable components should produce complex results, with peak rates sometimes being higher on the longer component schedule, and (d) that effects of reinforcement probability on mixed-FI should affect the response rate at the time of the shorter component only. All these predictions were confirmed by data, although effects in some experiments remain outside the scope of the model. In general, delay of reinforcement as a determinant of response rate on FI and related schedules (rather than temporal control on such schedules) seems a useful starting point for a more thorough analysis of some neglected questions about performance on FI and related schedules.

  10. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  11. APOLLO 17 PRELAUNCH ASTRONAUT TRAINING

    Science.gov (United States)

    1972-01-01

    Apollo Command Module Pilot Evans, left, and Mission Commander Cernan, right, discuss their flight plans as each prepares to fly a T-38 jet aircraft at Patrick Air Force Base just south of the Spaceport. Astronauts Cernan and Evans flew the T-38 aircraft today on training flights over the Kennedy Space Center area to practice flying skills in preparation for upcoming launch to the Moon scheduled 12/06/72.

  12. A manpower scheduling heuristic for aircraft maintenance application

    Science.gov (United States)

    Sze, San-Nah; Sze, Jeeu-Fong; Chiew, Kang-Leng

    2012-09-01

    This research studies a manpower scheduling for aircraft maintenance, focusing on in-flight food loading operation. A group of loading teams with flexible shifts is required to deliver and upload packaged meals from the ground kitchen to aircrafts in multiple trips. All aircrafts must be served within predefined time windows. The scheduling process takes into account of various constraints such as meal break allocation, multi-trip traveling and food exposure time limit. Considering the aircrafts movement and predefined maximum working hours for each loading team, the main objective of this study is to form an efficient roster by assigning a minimum number of loading teams to the aircrafts. We proposed an insertion based heuristic to generate the solutions in a short period of time for large instances. This proposed algorithm is implemented in various stages for constructing trips due to the presence of numerous constraints. The robustness and efficiency of the algorithm is demonstrated in computational results. The results show that the insertion heuristic more efficiently outperforms the company's current practice.

  13. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  14. Sprint vs. intermittent training in young female basketball players.

    Science.gov (United States)

    Attene, G; Pizzolato, F; Calcagno, G; Ibba, G; Pinna, M; Salernitano, G; Padulo, J

    2014-04-01

    This study aimed at comparing the effects of intermittent and repeated sprint ability training on physiological variables. Sixteen young female basketball players were randomly allocated to intermittent training (IT=8) or repeated sprint ability training (RST=8) groups. The following outcomes were measured at baseline and after 6 weeks of training: Yo-Yo intermittent recovery (Yo-Yo) and repeated sprint ability (RSA) tests. For all the variables investigated the effect of training type showed a different trend respect at current knowledge. In the RSA, best time (BT) was a significant main effect of training time (pre- vs. post-) (Ptraining type/time (P=0.03). The RST showed a decrease in BT of 3.1% (P=0.005) while the IT showed a decrease of 6.2% (Ptraining methods used in this study can be an effective training strategy for inducing anaerobic and basketball-specific training schedules. Besides, even when IT training is not done at very high speed, it can increase the maximum speed of the RSA.

  15. Intense Training as a Means to Improve Running Performance in Trained Runners and the Adaptation of Muscle Tissue

    DEFF Research Database (Denmark)

    Skovgaard, Casper

    compositions of intense training on performance, movement economy and muscular adaptations. The findings from the present PhD study suggest that performing intense training, in the form of speed endurance training (SET), for a relatively short period improves short and long-term performance. Both a prolonged...... period of SET as well as a period with increased frequency of SET improves short-term performance further, but a prolonged period does not extrapolate to further improved long-term performance not even if SET frequency is doubled. Short-term performance was better after 16 days of reduced training volume...... the period of increased frequency of SET, the value of combining an overload phase with tapering to improve 10-km performance is low. In line with the literature on "muscle memory", performing a second intervention of SET and a basic volume of aerobic training might have a greater impact on short-term...

  16. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  17. Case scheduling preferences of one Surgeon's cataract surgery patients.

    Science.gov (United States)

    Dexter, Franklin; Birchansky, Lee; Bernstein, James M; Wachtel, Ruth E

    2009-02-01

    The increase in the number of operating rooms nationwide in the United States may reflect preferences of patients for scheduling of outpatient surgery. Yet, little is known of the importance that patients place on scheduling convenience and flexibility. Fifty cataract surgery patients seen by a surgeon at his main office during a 6-mo period responded to a marketing survey. All the patients had Medicare insurance and supplemental insurance permitting surgery at any facility. A telephone questionnaire included four vignettes describing different choices in the scheduling of cataract surgery. Respondents were asked how far they would be willing to travel for one option instead of another. For example, "Your surgery will be on Thursday in three weeks at 2 pm. You can drink water until 9 am. You arrive at 10 am, because your surgery might start early. If you travel farther, you would arrive at 8 am for 9 am surgery." The median (50th percentile) additional travel time was 60 min (lower 95% confidence bound >or=52 min) for each of four options: to receive care on a day chosen by the patient instead of assigned by the physician, to receive care at a single site instead of both the surgeon's office and a surgery center at a different location, to combine the examination and the surgery into a single visit instead of two visits, and to have surgery in the morning instead of the afternoon. The patients of this ophthalmologist placed a high value on convenience and flexibility in scheduling their surgery. In general, this would be achievable only if many operating rooms were available each morning.

  18. 48 CFR 2803.104-70 - Ethics program training requirements.

    Science.gov (United States)

    2010-10-01

    ... contracting officers and procurement officials. The Ethics Official should be contacted directly to schedule... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Ethics program training... General IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 2803.104-70 Ethics...

  19. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  20. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....