WorldWideScience

Sample records for periodic train scheduling

  1. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  2. Scheduling Additional Train Unit Services on Rail Transit Lines

    OpenAIRE

    Zhibin Jiang; Yuyan Tan; Özgür Yalçınkaya

    2014-01-01

    This paper deals with the problem of scheduling additional train unit (TU) services in a double parallel rail transit line, and a mixed integer programming (MIP) model is formulated for integration strategies of new trains connected by TUs with the objective of obtaining higher frequencies in some special sections and special time periods due to mass passenger volumes. We took timetable scheduling and TUs scheduling as an integrated optimization model with two objectives: minimizing travel ti...

  3. MOV reliability evaluation and periodic verification scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  4. MOV reliability evaluation and periodic verification scheduling

    International Nuclear Information System (INIS)

    Bunte, B.D.

    1996-01-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs

  5. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  6. Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2015-01-01

    Full Text Available For providing passengers with periodic operation trains and making trains’ time distribution better fit that of passengers, the multiperiod mixed train schedule is first proposed in this paper. It makes each type of train having same origin, destination, route, and stop stations operate based on a periodic basis and allows different types of train to have various operation periods. Then a model of optimizing multiperiod mixed train schedule is built to minimize passengers generalized travel costs with the constraints of trains of same type operating periodically, safe interval requirements of trains’ departure, and arrival times, and so forth. And its heuristic algorithm is designed to optimize the multiperiod mixed train schedule beginning with generating an initial solution by scheduling all types of train type by type and then repeatedly improving their periodic schedules until the objective value cannot be reduced or the iteration number reaches its maximum. Finally, example results illustrate that the proposed model and algorithm can effectively gain a better multiperiod mixed train schedule. However, its passengers deferred times and advanced times are a little higher than these of an aperiodic train schedule.

  7. Safety Training: scheduled sessions in March

    CERN Multimedia

    DGS Unit

    2011-01-01

    The following training courses are scheduled in March. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Biocell Training 08-MAR-11 (08.30 – 10.00) in English 08-MAR-11 (10.30 – 12.00) in French 15-MAR-11 (08.30 – 10.00) in French 15-MAR-11 (10.30 – 12.00) in French 17-MAR-11 (08.30 – 10.00) in English 17-MAR-11 (10.30 – 12.00) in English 22-MAR-11 (08.30 – 10.00) in French 22-MAR-11 (10.30 – 12.00) in French 24-MAR-11 (08.30 – 10.00) in French 24-MAR-11 (10.30 – 12.00) in French 29-MAR...

  8. Safety Training: scheduled sessions in May

    CERN Multimedia

    Isabelle Cusato (HSE Unit)

    2011-01-01

    The following training courses are scheduled in March. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year.   Biocell Training 10-MAY-11 (08.30 – 10.00) in French 10-MAY-11 (10.30 – 12.00) in French 12-MAY-11 (08.30 – 10.00) in English 12-MAY-11 (10.30 – 12.00) in English 19-MAY-11 (08.30 – 10.00) in French 19-MAY-11 (10.30 – 12.00) in French 24-MAY-11 (08.30 – 10.00) in English 24-MAY-11 (10.30 – 12.00) in English   Champs Magnétiques 13-MAY-11 (09.30 – 11.30) in French...

  9. Safety Training: scheduled sessions in April

    CERN Multimedia

    DGS Unit

    2011-01-01

    The following training courses are scheduled in April. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Biocell Training 26-APR-11 (08.30 – 10.00) in French 26-APR-11 (10.30 – 12.00) in French Conduite de plates-formes élévatrices mobiles de personnel (PEMP) 28-APR-11 to 29-APR-11 (08.00 – 17.30) in French* Sécurité chimique – Introduction 29-APR-11 (09.00 – 11.30) in French (*) session in French with the possibility of receiving the documentation in English   By Isabelle Cusato (H...

  10. Periodic Heterogeneous Vehicle Routing Problem With Driver Scheduling

    Science.gov (United States)

    Mardiana Panggabean, Ellis; Mawengkang, Herman; Azis, Zainal; Filia Sari, Rina

    2018-01-01

    The paper develops a model for the optimal management of logistic delivery of a given commodity. The company has different type of vehicles with different capacity to deliver the commodity for customers. The problem is then called Periodic Heterogeneous Vehicle Routing Problem (PHVRP). The goal is to schedule the deliveries according to feasible combinations of delivery days and to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the sum of the costs of all routes over the planning horizon. We propose a combined approach of heuristic algorithm and exact method to solve the problem.

  11. Using Multiple Schedules during Functional Communication Training to Promote Rapid Transfer of Treatment Effects

    Science.gov (United States)

    Fisher, Wayne W.; Greer, Brian D.; Fuhrman, Ashley M.; Querim, Angie C.

    2015-01-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and…

  12. JIT single machine scheduling problem with periodic preventive maintenance

    Science.gov (United States)

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-09-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.

  13. Schedules for home visits in the early postpartum period.

    Science.gov (United States)

    Yonemoto, Naohiro; Dowswell, Therese; Nagai, Shuko; Mori, Rintaro

    2017-08-02

    Maternal complications including psychological and mental health problems and neonatal morbidity have been commonly observed in the postpartum period. Home visits by health professionals or lay supporters in the weeks following the birth may prevent health problems from becoming chronic with long-term effects on women, their babies, and their families. To assess outcomes for women and babies of different home-visiting schedules during the early postpartum period. The review focuses on the frequency of home visits, the duration (when visits ended) and intensity, and on different types of home-visiting interventions. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (28 January 2013) and reference lists of retrieved articles. Randomised controlled trials (RCTs) (including cluster-RCTs) comparing different types of home-visiting interventions enrolling participants in the early postpartum period (up to 42 days after birth). We excluded studies in which women were enrolled and received an intervention during the antenatal period (even if the intervention continued into the postnatal period) and studies recruiting only women from specific high-risk groups. (e.g. women with alcohol or drug problems). Study eligibility was assessed by at least two review authors. Data extraction and assessment of risk of bias were carried out independently by at least two review authors. Data were entered into Review Manager software. We included data from 12 randomised trials with data for more than 11,000 women. The trials were carried out in countries across the world, and in both high- and low-resource settings. In low-resource settings women receiving usual care may have received no additional postnatal care after early hospital discharge.The interventions and control conditions varied considerably across studies with trials focusing on three broad types of comparisons: schedules involving more versus fewer postnatal home visits (five studies), schedules

  14. Basic Features of Customer Satisfaction with Train Schedules

    Science.gov (United States)

    Murakoshi, Akiko; Kunimatsu, Taketoshi; Saito, Ayano

    This paper aims to reveal the fundamental features of customer satisfaction with train schedules, which is one of the most basic services provided by a railway company. A customer satisfaction survey of passengers who frequently utilize three lines in the metropolitan area was conducted; we obtained the following findings: (a) out of nine factors to evaluate a train schedule from a passenger's viewpoint, the four most important ones are the frequency of trains running, punctuality, congestion rate, and time distance; (b) the ride-frequency influences the degree of satisfaction with train schedules in a particular line; and (c) it is important to set a numeric goal for the level of customer satisfaction by grasping the relationship between the transport service and a passenger's satisfaction with that service. The difference between customer satisfaction and passenger disutility is also discussed. The findings are expected to help conduct customer satisfaction surveys and also to form the basis for establishing a method by which to evaluate a train schedule from passengers' satisfaction ratings.

  15. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    Science.gov (United States)

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  16. Integrating rolling stock scheduling with train unit shunting

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Lusby, Richard Martin

    2017-01-01

    In this paper, we consider integrating two important railway optimization problems, in particular the Rolling Stock Scheduling Problem and the Train Unit Shunting Problem. We present two similar branch-and-cut based approaches to solve this integrated problem and, in addition, provide a comparison......, sequential approach ends in infeasibility. Furthermore, for the considered instances, solutions are typically found within a few minutes, indicating the applicability of the methodology to short-term planning....

  17. Multiresource allocation and scheduling for periodic soft real-time applications

    Science.gov (United States)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  18. Safety Training: scheduled sessions in September and October 2011

    CERN Multimedia

    2011-01-01

    The following training courses are scheduled in September – October. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Alphabetical order (original course titles are maintained) Conduite de chariots élévateurs 17-OCT-11 to 18-OCT-11, 8.00 – 17.30, in French * Ergonomics - Applying ergonomic principles in the workplace 15-SEP-11, 9.00 – 12.30, in French 15-SEP-11, 14.00 – 17.30, in English Habilitation électrique : Personnel électricien effectuant des opérations du domaine de tension BTA...

  19. Safety Training: scheduled sessions in September and October 2011

    CERN Multimedia

    DGS Unit

    2011-01-01

    The following training courses are scheduled in September – October. You can find the full Safety Training programme on the Safety Training online catalogue. If you are interested in attending any of the below courses, please talk to your supervisor, then apply electronically via EDH from the course description pages, by clicking on SIGN-UP. Registration for all courses is always open – sessions for the less-requested courses are organized on a demand-basis only. Depending on the demand, a session will be organised later in the year. Alphabetical order (original course titles are maintained) Chemical Safety – Introduction 11-OCT-11, 9.00 – 11.30, in English Conduite de chariots élévateurs 17-OCT-11 to 18-OCT-11, 8.00 – 17.30, in French * Ergonomics - Applying ergonomic principles in the workplace 15-SEP-11, 9.00 – 12.30, in French 15-SEP-11, 14.00 – 17.30, in English Habilitation électrique : Personne...

  20. Evaluation of different time schedules in training with the Da Vinci simulator.

    Science.gov (United States)

    Güldner, C; Orth, A; Dworschak, P; Diogo, I; Mandapathil, M; Teymoortash, A; Walliczek-Dworschak, U

    2017-10-01

    This prospective study analyzed the effect of different time schedules in training on the main performance outcomes: overall score, time to complete, and economy of motion. The study was performed on the da Vinci Skills Simulator from December 2014 to April 2016. Forty robotic novices were randomized into two groups of 20 participants, which trained in the same three exercises but with different intervals between their training sessions. Each group performed training in Peg Board 1 in their first week, Match Board 2 in their second week, and Ring and Rail 2 in their third week. On their last day, Needle Targeting and Energy Dissection 2, for which no previous training had been received, were performed. Regarding the different training intervals, group 1 trained each exercise six times in a row once a week. Group 2 performed their training once a day for 5 days. Technical performance parameters were recorded by the Mimics simulator software for further analysis. In addition, the participants were asked to fill out a questionnaire concerning the robotics training. Group 2 performed significantly better compared to group 1 in the main metrics in the more advanced exercises. For the easier exercises, the training frequency did not lead to significant differences in performance outcome. A significant skills gain was seen between the first and last training sessions for all exercises in both groups. Performance in the final exercise NT was significantly better in group 2 than group 1. Regarding ED 2, no difference was found between the two groups. As the training of group 2 led to significantly better outcomes, we suggest that, especially for advanced exercises, it seems to be more favorable to perform training every day for a short period than to train once a week six times in a row.

  1. Static Scheduling of Periodic Hardware Tasks with Precedence and Deadline Constraints on Reconfigurable Hardware Devices

    Directory of Open Access Journals (Sweden)

    Ikbel Belaid

    2011-01-01

    Full Text Available Task graph scheduling for reconfigurable hardware devices can be defined as finding a schedule for a set of periodic tasks with precedence, dependence, and deadline constraints as well as their optimal allocations on the available heterogeneous hardware resources. This paper proposes a new methodology comprising three main stages. Using these three main stages, dynamic partial reconfiguration and mixed integer programming, pipelined scheduling and efficient placement are achieved and enable parallel computing of the task graph on the reconfigurable devices by optimizing placement/scheduling quality. Experiments on an application of heterogeneous hardware tasks demonstrate an improvement of resource utilization of 12.45% of the available reconfigurable resources corresponding to a resource gain of 17.3% compared to a static design. The configuration overhead is reduced to 2% of the total running time. Due to pipelined scheduling, the task graph spanning is minimized by 4% compared to sequential execution of the graph.

  2. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled

    CERN Multimedia

    2006-01-01

    Course Sessions (October 2006-March 2007) The Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the PERL, C++, OO and Java course series there are some places available on the following course sessions, currently scheduled until March 2007: Object-Oriented Analysis and Design using UML: 17-19 October 2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 19-20 October 2006 (2 days) JAVA - Level 1: 30 October -1 November 2006 (3 days) PERL 5 - Advanced Aspects: 2 November 2006 (1 day) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16 November 2006 (3 days) JAVA - Level 2: 4-7 December 2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15 December 2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 18-20 December 2006 (3 days) C++ for Particle Physicists:...

  3. Schedule and complex motion of shuttle bus induced by periodic inflow of passengers

    Science.gov (United States)

    Nagatani, Takashi; Naito, Yuichi

    2011-09-01

    We have studied the dynamic behavior of a bus in the shuttle bus transportation with a periodic inflow. A bus schedule is closely related to the dynamics. We present the modified circle map model for the dynamics of the shuttle bus. The motion of the shuttle bus depends on the loading parameter and the inflow period. The shuttle bus displays the periodic, quasi-periodic, and chaotic motions with varying both loading parameter and inflow rate.

  4. On utilization bounds for a periodic resource under rate monotonic scheduling

    NARCIS (Netherlands)

    Renssen, van A.M.; Geuns, S.J.; Hausmans, J.P.H.M.; Poncin, W.; Bril, R.J.

    2009-01-01

    This paper revisits utilization bounds for a periodic resource under the rate monotonic (RM) scheduling algorithm. We show that the existing utilization bound, as presented in [8, 9], is optimistic. We subsequently show that by viewing the unavailability of the periodic resource as a deferrable

  5. Schedule and complex motion of shuttle bus induced by periodic inflow of passengers

    International Nuclear Information System (INIS)

    Nagatani, Takashi; Naito, Yuichi

    2011-01-01

    We have studied the dynamic behavior of a bus in the shuttle bus transportation with a periodic inflow. A bus schedule is closely related to the dynamics. We present the modified circle map model for the dynamics of the shuttle bus. The motion of the shuttle bus depends on the loading parameter and the inflow period. The shuttle bus displays the periodic, quasi-periodic, and chaotic motions with varying both loading parameter and inflow rate. -- Highlights: → We studied the dynamic behavior of a bus in the shuttle bus transportation. → We presented the modified circle map model for the bus schedule. → We clarified the dependence of the tour time on both loading parameter and inflow period.

  6. A duty-period-based formulation of the airline crew scheduling problem

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, K.

    1994-12-31

    We present a new formulation of the airline crew scheduling problem that explicitly considers the duty periods. We suggest an algorithm for solving the formulation by a column generation approach with branch-and-bound. Computational results are reported for a number of test problems.

  7. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    Science.gov (United States)

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  8. No exacerbation of knee joint pain and effusion following preoperative progressive resistance training in patients scheduled for total knee arthroplasty

    DEFF Research Database (Denmark)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas

    2017-01-01

    BACKGROUND: Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. OBJECTIVE: To examine if preoperative PRT initiated 5 weeks prior to TKA would 1......) exacerbate pain and knee effusion, 2) allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. DESIGN: Secondary analyses from a randomized controlled trial. SETTING: University Hospital and a Regional Hospital. PATIENTS: Thirty patients...... OUTCOME MEASURES: Before and after each training session, knee joint pain rated on an 11-point scale, effusion assessed by measuring the knee joint circumference, and training load were recorded. The first and last training session were initiated by 1RM testing of unilateral leg press, knee extension...

  9. Combinations of response-reinforcer relations in periodic and aperiodic schedules.

    Science.gov (United States)

    Kuroda, Toshikazu; Cançado, Carlos R X; Lattal, Kennon A; Elcoro, Mirari; Dickson, Chata A; Cook, James E

    2013-03-01

    Key pecking of 4 pigeons was studied under a two-component multiple schedule in which food deliveries were arranged according to a fixed and a variable interfood interval. The percentage of response-dependent food in each component was varied, first in ascending (0, 10, 30, 70 and 100%) and then in descending orders, in successive conditions. The change in response rates was positively related to the percentage of response-dependent food in each schedule component. Across conditions, positively accelerated and linear patterns of responding occurred consistently in the fixed and variable components, respectively. These results suggest that the response-food dependency determines response rates in periodic and aperiodic schedules, and that the temporal distribution of food determines response patterns independently of the response-food dependency. Running rates, but not postfood pauses, also were positively related to the percentage of dependent food in each condition, in both fixed and variable components. Thus, the relation between overall response rate and the percentage of dependent food was mediated by responding that occurred after postfood pausing. The findings together extend previous studies wherein the dependency was either always present or absent, and increase the generality of the effects of variations in the response-food dependency from aperiodic to periodic schedules. © Society for the Experimental Analysis of Behavior.

  10. Auditory Training for Adults Who Have Hearing Loss: A Comparison of Spaced Versus Massed Practice Schedules.

    Science.gov (United States)

    Tye-Murray, Nancy; Spehar, Brent; Barcroft, Joe; Sommers, Mitchell

    2017-08-16

    The spacing effect in human memory research refers to situations in which people learn items better when they study items in spaced intervals rather than massed intervals. This investigation was conducted to compare the efficacy of meaning-oriented auditory training when administered with a spaced versus massed practice schedule. Forty-seven adult hearing aid users received 16 hr of auditory training. Participants in a spaced group (mean age = 64.6 years, SD = 14.7) trained twice per week, and participants in a massed group (mean age = 69.6 years, SD = 17.5) trained for 5 consecutive days each week. Participants completed speech perception tests before training, immediately following training, and then 3 months later. In line with transfer appropriate processing theory, tests assessed both trained tasks and an untrained task. Auditory training improved the speech recognition performance of participants in both groups. Benefits were maintained for 3 months. No effect of practice schedule was found on overall benefits achieved, on retention of benefits, nor on generalizability of benefits to nontrained tasks. The lack of spacing effect in otherwise effective auditory training suggests that perceptual learning may be subject to different influences than are other types of learning, such as vocabulary learning. Hence, clinicians might have latitude in recommending training schedules to accommodate patients' schedules.

  11. The personalized sport trainning in its periods

    Directory of Open Access Journals (Sweden)

    Vladimir Medina Vaillant

    2014-12-01

    Full Text Available The sport training is a process that, by means of the physical exercise, tends to reach a more or less high level according to the proposed objectives, causing a modification of the physical, motor, cognitive and affective state on the athletes with the aim to obtain competitive results. It can also be defined as the main form of putting into practice the sportsman's preparation, being the most important features the fact that it represents an organized didactic process which is characterized by the rigorous use of all teaching, education and selfeducacion process factors, as well as a methodological system of the physical exercises that constitutes the base of the sport training with the purpose of achieving the biggest effect in the development, whenever it is possible to direct the process of sport improvement fully. The personality is a concrete person in all his/her social and psychological particularities diversity; it is the subject of the social activity and of the social relationships. One of the most characteristic aspects in the human personality is his/her individuality, understanding it as a group, only in his/her gender, with psychological particularities that makes each individual different from the other ones, in relation with the character, the temperament, the peculiarities to reflect the psychic processes, the group of feelings and reasons for the activity. The understanding and the consideration of the individual particularities have a great importance in the sportsman's practical life during the training. Starting from the inadequacies detected in the trainings and competitions connected with the athletes’ preparation, assimilation and application of the received knowledge, we propose the present material about personalized training, like tool for trainers´ development in order to achieve the sportsman's more complete preparation, taking into account the contemporary training direction. There were used investigative

  12. Optimal trajectory planning and train scheduling for urban rail transit systems

    CERN Document Server

    Wang, Yihui; van den Boom, Ton; De Schutter, Bart

    2016-01-01

    This book contributes to making urban rail transport fast, punctual and energy-efficient –significant factors in the importance of public transportation systems to economic, environmental and social requirements at both municipal and national levels. It proposes new methods for shortening passenger travel times and for reducing energy consumption, addressing two major topics: (1) train trajectory planning: the authors derive a nonlinear model for the operation of trains and present several approaches for calculating optimal and energy-efficient trajectories within a given schedule; and (2) train scheduling: the authors develop a train scheduling model for urban rail systems and optimization approaches with which to balance total passenger travel time with energy efficiency and other costs to the operator. Mixed-integer linear programming and pseudospectral methods are among the new methods proposed for single- and multi-train systems for the solution of the nonlinear trajectory planning problem which involv...

  13. Scheduling freight trains in rail-rail transshipment yards

    OpenAIRE

    Nils Boysen; Erwin Pesch

    2008-01-01

    Transshipment yards, where gantry cranes allow for an effcient transshipment of containers between different freight trains, are important entities in modern railway systems and facilitate the general shift from point-to-point transport to hub-and-spoke railway systems. Modern rail-rail transshipment yards accelerate container handling, so that multiple smaller trains with equal destination can be consolidated to a reduced number of trains without jeopardizing on time deliveries. An important...

  14. Operations Research for Freight Train Routing and Scheduling

    DEFF Research Database (Denmark)

    Harrod, Steven; Gorman, Michael F.

    2011-01-01

    This article describes the service design activities that plan and implement the rail freight operating plan. Elements of strategic service design include the setting of train frequency, the routing of cars among trains, and the consolidation of cars, called blocking. At the operational level......, trains are dispatched either according to train paths configured in advance, called timetables, or according to priority rules. We describe the North American and European practice along with selected modeling and problem solving methodologies appropriate for each of the operating conditions described...

  15. Optimizing Training Event Schedules at Naval Air Station Fallon

    Science.gov (United States)

    2018-03-01

    Time VBA Visual Basic for Applications WTI Weapons and Tactics Instructor xiii THIS PAGE INTENTIONALLY LEFT BLANK xiv Executive Summary Naval Air...emitter inventory for each site. Constraint (3.6) ensures scheduled flight events have access to an emitter, at the proper location, required for the...flight event requests and their respective requirements into a specificmacro-enabled excel worksheet (Microsoftl, 2017). A series of VBA ( VBA , 2017

  16. Optimizing Intermodal Train Schedules with a Design Balanced Network Design Model

    DEFF Research Database (Denmark)

    Pedersen, Michael Berliner; Crainic, Teodor Gabriel

    We present a modeling approach for optimizing intermodal trains schedules based on an infrastructure divided into time-dependent train paths. The formulation can be generalized to a capacitated multi commodity network design model with additional design balance constraints. We present a Tabu Search...

  17. Comparison of Periodized and Non-Periodized Resistance Training on Maximal Strength: A Meta-Analysis.

    Science.gov (United States)

    Williams, Tyler D; Tolusso, Danilo V; Fedewa, Michael V; Esco, Michael R

    2017-10-01

    Periodization is a logical method of organizing training into sequential phases and cyclical time periods in order to increase the potential for achieving specific performance goals while minimizing the potential for overtraining. Periodized resistance training plans are proposed to be superior to non-periodized training plans for enhancing maximal strength. The primary aim of this study was to examine the previous literature comparing periodized resistance training plans to non-periodized resistance training plans and determine a quantitative estimate of effect on maximal strength. All studies included in the meta-analysis met the following inclusion criteria: (1) peer-reviewed publication; (2) published in English; (3) comparison of a periodized resistance training group to a non-periodized resistance training group; (4) maximal strength measured by 1-repetition maximum (1RM) squat, bench press, or leg press. Data were extracted and independently coded by two authors. Random-effects models were used to aggregate a mean effect size (ES), 95% confidence intervals (CIs) and potential moderators. The cumulative results of 81 effects gathered from 18 studies published between 1988 and 2015 indicated that the magnitude of improvement in 1RM following periodized resistance training was greater than non-periodized resistance training (ES = 0.43, 95% CI 0.27-0.58; P training status (β = -0.59; P = 0.0305), study length (β = 0.03; P = 0.0067), and training frequency (β = 0.46; P = 0.0123) were associated with a change in 1RM. These results indicate that undulating programs were more favorable for strength gains. Improvements in 1RM were greater among untrained participants. Additionally, higher training frequency and longer study length were associated with larger improvements in 1RM. These results suggest that periodized resistance training plans have a moderate effect on 1RM compared to non-periodized training plans. Variation in training stimuli

  18. Collaborative Optimization of Stop Schedule Plan and Ticket Allotment for the Intercity Train

    Directory of Open Access Journals (Sweden)

    Xichun Chen

    2016-01-01

    Full Text Available As regards the ticket allotment issue of the intercity passenger corridor designed for different train grades, the matching relationship between the ticket allotment and the passenger flow demand is studied. The passenger flow conversion equation which is based on the collaborative optimization of the intercity train stop schedule plan and ticket allotment is established. Then the mathematical model aiming at the maximum revenue of intercity train system and the highest satisfaction from the passengers is established. The particle swarm harmony search algorithm is designed to solve the model. The example verifies the effectiveness of the model and algorithm, which indicates that, through the collaborative optimization of the stop schedule plan and ticket allotment for different grades intercity trains, the sectional utilization rate of the train can be improved; meanwhile, the optimum matching between the intercity train revenue and the passenger satisfaction can be realized.

  19. The influence of different training schedules on the learning of psychomotor skills for endoscopic surgery.

    Science.gov (United States)

    Verdaasdonk, E G G; Stassen, L P S; van Wijk, R P J; Dankelman, J

    2007-02-01

    Psychomotor skills for endoscopic surgery can be trained with virtual reality simulators. Distributed training is more effective than massed training, but it is unclear whether distributed training over several days is more effective than distributed training within 1 day. This study aimed to determine which of these two options is the most effective for training endoscopic psychomotor skills. Students with no endoscopic experience were randomly assigned either to distributed training on 3 consecutive days (group A, n = 10) or distributed training within 1 day (group B, n = 10). For this study the SIMENDO virtual reality simulator for endoscopic skills was used. The training involved 12 repetitions of three different exercises (drop balls, needle manipulation, 30 degree endoscope) in differently distributed training schedules. All the participants performed a posttraining test (posttest) for the trained tasks 7 days after the training. The parameters measured were time, nontarget environment collisions, and instrument path length. There were no significant differences between the groups in the first training session for all the parameters. In the posttest, group A (training over several days) performed 18.7% faster than group B (training on 1 day) (p = 0.013). The collision and path length scores for group A did not differ significantly from the scores for group B. The distributed group trained over several days was faster, with the same number of errors and the same instrument path length used. Psychomotor skill training for endoscopic surgery distributed over several days is superior to training on 1 day.

  20. Susceptibility of optimal train schedules to stochastic disturbances of process times

    DEFF Research Database (Denmark)

    Larsen, Rune; Pranzo, Marco; D’Ariano, Andrea

    2013-01-01

    study, an advanced branch and bound algorithm, on average, outperforms a First In First Out scheduling rule both in deterministic and stochastic traffic scenarios. However, the characteristic of the stochastic processes and the way a stochastic instance is handled turn out to have a serious impact...... and dwell times). In fact, the objective of railway traffic management is to reduce delay propagation and to increase disturbance robustness of train schedules at a network scale. We present a quantitative study of traffic disturbances and their effects on the schedules computed by simple and advanced...

  1. On the optimal scheduling of periodic tests and maintenance for reliable redundant components

    International Nuclear Information System (INIS)

    Courtois, Pierre-Jacques; Delsarte, Philippe

    2006-01-01

    Periodically, some m of the n redundant components of a dependable system may have to be taken out of service for inspection, testing or preventive maintenance. The system is then constrained to operate with lower (n-m) redundancy and thus with less reliability during these periods. However, more frequent periodic inspections decrease the probability that a component fail undetected in the time interval between successive inspections. An optimal time schedule of periodic preventive operations arises from these two conflicting factors, balancing the loss of redundancy during inspections against the reliability benefits of more frequent inspections. Considering no other factor than this decreased redundancy at inspection time, this paper demonstrates the existence of an optimal interval between inspections, which maximizes the mean time between system failures. By suitable transformations and variable identifications, an analytic closed form expression of the optimum is obtained for the general (m, n) case. The optimum is shown to be unique within the ranges of parameter values valid in practice; its expression is easy to evaluate and shown to be useful to analyze and understand the influence of these parameters. Inspections are assumed to be perfect, i.e. they cause no component failure by themselves and leave no failure undetected. In this sense, the optimum determines a lowest bound for the system failure rate that can be achieved by a system of n-redundant components, m of which require for inspection or maintenance recurrent periods of unavailability of length t. The model and its general closed form solution are believed to be new . Previous work had computed optimal values for an estimation of a time average of system unavailability, but by numerical procedures only and with different numerical approximations, other objectives and model assumptions (one component only inspected at a time), and taking into account failures caused by testing itself, repair and

  2. High-Speed Train Stop-Schedule Optimization Based on Passenger Travel Convenience

    OpenAIRE

    Dingjun Chen; Shaoquan Ni; Chang’an Xu; Hongxia Lv; Simin Wang

    2016-01-01

    The stop-schedules for passenger trains are important to the operation planning of high-speed trains, and they decide the quality of passenger service and the transportation efficiency. This paper analyzes the specific manifestation of passenger travel convenience and proposes the concepts of interstation accessibility and degree of accessibility. In consideration of both the economic benefits of railway corporations and the travel convenience of passengers, a multitarget optimization model i...

  3. Specific features of elite bodybuilders’ training process in competition period

    Directory of Open Access Journals (Sweden)

    A.A. Tihorsky

    2016-12-01

    Full Text Available Purpose: To substantiate methodic of training process construction for elite bodybuilders in competition period with usage of different training methods. Material: elite bodybuilders - members of combined team of Ukraine (n=16 participated in the research. Results: we presented comparative characteristic of the most often used bodybuilding training methodic. Besides, optimal training methodic in competition period was worked out and substantiated. Such methodic permits to improve body proportions at the account of fat layer reduction. By the data of Harvard step-test the sportsmen improved organism’s functional potentials by 6%. Conclusions: the offered methodic noticeably reduces probability of functional unfavorable states (over-training, overloading, traumas. The methodic permits to achieve the required sport form without over-tension adaptation-compensatory mechanisms and acquire maximal muscular relief; improve proportions with minimal losses of muscles’ volume.

  4. Sensitive periods in human development: evidence from musical training.

    Science.gov (United States)

    Penhune, Virginia B

    2011-10-01

    One of the primary goals of cognitive neuroscience is to understand the interaction between genes, development and specific experience. A particularly fascinating example of this interaction is a sensitive period - a time during development when experience has a differential effect on behavior and the brain. Behavioral and brain imaging studies in musicians have provided suggestive evidence for a possible sensitive period for musical training; showing that musicians who began training early show better task performance and greater changes in auditory and motor regions of the brain. However, these studies have not controlled for likely differences between early- (ET) and late-trained (LT) musicians in the number of years of musical experience. This review presents behavioral work from our laboratory comparing the performance of ET (before age seven) and LT musicians who were matched for years of experience on the ability to tap in synchrony with auditory and visual rhythms. The results demonstrate the existence of a possible sensitive period for musical training that has its greatest impact on measures of sensorimotor integration. Work on motor learning in children and how this might relate to the observed sensitive period effect is also reviewed. These studies are described in the context of what is currently known about sensitive periods in animals and humans; drawing on evidence from anatomy and physiology, studies of deafness, as well as structural and functional neuroimaging studies in trained musicians. The possible mechanisms underlying sensitive periods for musical training are discussed based on current theories describing the influence of both low-level features of sensory experience and higher-level cognitive processing. Copyright © 2011 Elsevier Srl. All rights reserved.

  5. Elastic Bands as a Component of Periodized Resistance Training.

    Science.gov (United States)

    Joy, Jordan M; Lowery, Ryan P; Oliveira de Souza, Eduardo; Wilson, Jacob M

    2016-08-01

    Joy, JM, Lowery, RP, Oliveira de Souza, E, and Wilson, JM. Elastic bands as a component of periodized resistance training. J Strength Cond Res 30(8): 2100-2106, 2016-Variable resistance training (VRT) has recently become a component of strength and conditioning programs. Prior research has demonstrated increases in power and/or strength using low loads of variable resistance. However, no study has examined using high loads of variable resistance as a part of a periodized training protocol to examine VRT within the context of a periodized training program and to examine a greater load of variable resistance than has been examined in prior research. Fourteen National Collegiate Athletic Association division II male basketball players were recruited for this study. Athletes were divided equally into either a variable resistance or control group. The variable resistance group added 30% of their 1 repetition maximum (1RM) as band tension to their prescribed weight 1 session per week. Rate of power development (RPD), peak power, strength, body composition, and vertical jump height were measured pretreatment and posttreatment. No baseline differences were observed between groups for any measurement of strength, power, or body composition. A significant group by time interaction was observed for RPD, in which RPD was greater in VRT posttraining than in the control group. Significant time effects were observed for all other variables including squat 1RM, bench press 1RM, deadlift 1RM, clean 3RM, vertical jump, and lean mass. Although there were no significant group ×-time interactions, the VRT group's percent changes and effect sizes indicate a larger treatment effect in the squat and bench press 1RM values and the vertical jump performed on the force plate and vertec. These results suggest that when using variable resistance as a component of a periodized training program, power and strength can be enhanced. Therefore, athletes who add variable resistance to 1 training

  6. An effective repetitive training schedule to achieve skill proficiency using a novel robotic virtual reality simulator.

    Science.gov (United States)

    Kang, Sung Gu; Ryu, Byung Ju; Yang, Kyung Sook; Ko, Young Hwii; Cho, Seok; Kang, Seok Ho; Patel, Vipul R; Cheon, Jun

    2015-01-01

    A robotic virtual reality simulator (Mimic dV-Trainer) can be a useful training method for the da Vinci surgical system. Herein, we investigate several repetitive training schedules and determine which is the most effective. A total of 30 medical students were enrolled and were divided into 3 groups according to the training schedule. Group 1 performed the task 1 hour daily for 4 consecutive days, group II performed the task on once per week for 1 hour for 4 consecutive weeks, and group III performed the task for 4 consecutive hours in 1 day. The effects of training were investigated by analyzing the number of repetitions and the time required to complete the "Tube 2" simulation task when the learning curve plateau was reached. The point at which participants reached a stable score was evaluated using the cumulative sum control graph. The average time to complete the task at the learning curve plateau was 150.3 seconds in group I, 171.9 seconds in group II, and 188.5 seconds in group III. The number of task repetitions required to reach the learning curve plateau was 45 repetitions in group I, 36 repetitions in group II, and 39 repetitions in group III. Therefore, there was continuous improvement in the time required to perform the task after 40 repetitions in group I only. There was a significant correlation between improvement in each trial interval and attempt, and the correlation coefficient (0.924) in group I was higher than that in group II (0.899) and group III (0.838). Daily 1-hour practice sessions performed for 4 consecutive days resulted in the best final score, continuous score improvement, and effective training while minimizing fatigue. This repetition schedule can be used for effectively training novices in future. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  7. No Exacerbation of Knee Joint Pain and Effusion Following Preoperative Progressive Resistance Training in Patients Scheduled for Total Knee Arthroplasty: Secondary Analyses From a Randomized Controlled Trial.

    Science.gov (United States)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas; Søballe, Kjeld; Mechlenburg, Inger

    2017-11-09

    Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. To examine whether preoperative PRT initiated 5 weeks prior to TKA would exacerbate pain and knee effusion, and would allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. Secondary analyses from a randomized controlled trial. University Hospital and a Regional Hospital. A total of 30 patients who were scheduled for TKA due to osteoarthritis and assigned as the intervention group. Patients underwent unilateral PRT (3 sessions per week). Exercise loading was 12 repetitions maximum (RM) with progression toward 8 RM. The training program consisted of 6 exercises performed unilaterally. Before and after each training session, knee joint pain was rated on an 11-point scale, effusion was assessed by measuring the knee joint circumference, and training load was recorded. The first and last training sessions were initiated by 1 RM testing of unilateral leg press, unilateral knee extension, and unilateral knee flexion. The median pain change score from before to after each training session was 0 at all training sessions. The average increase in knee joint effusion across the 12 training sessions was a mean 0.16 cm ± 0.23 cm. No consistent increase in knee joint effusion after training sessions during the training period was found (P = .21). Training load generally increased, and maximal muscle strength improved as follows: unilateral leg press: 18% ± 30% (P = .03); unilateral knee extension: 81% ± 156% (P knee flexion: 53% ± 57% (P knee joint pain and effusion, despite a substantial progression in loading and increased muscle strength. Concerns for side effects such as pain and effusion after PRT seem unfounded. To be determined. Copyright © 2017. Published by Elsevier Inc.

  8. The impact of training schedules on the sleep and fatigue of elite athletes.

    Science.gov (United States)

    Sargent, Charli; Lastella, Michele; Halson, Shona L; Roach, Gregory D

    2014-12-01

    In any sport, successful performance requires a planned approach to training and recovery. While sleep is recognized as an essential component of this approach, the amount and quality of sleep routinely obtained by elite athletes has not been systematically evaluated. Data were collected from 70 nationally ranked athletes from seven different sports. Athletes wore wrist activity monitors and completed self-report sleep/training diaries for 2 weeks during normal training. The athletes also recorded their fatigue level prior to each training session using a 7-point scale. On average, the athletes spent 08:18 ± 01:12 h in bed, fell asleep at 23:06 ± 01:12 h, woke at 6:48 ± 01:30 h and obtained 06:30 ± 01:24 h of sleep per night. There was a marked difference in the athletes' sleep/wake behaviour on training days and rest days. Linear mixed model analyses revealed that on nights prior to training days, time spent in bed was significantly shorter (p = 0.001), sleep onset and offset times were significantly earlier (p sleep obtained was significantly less (p = 0.001), than on nights prior to rest days. Moreover, there was a significant effect of sleep duration on pre-training fatigue levels (p ≤ 0.01). Specifically, shorter sleep durations were associated with higher levels of pre-training fatigue. Taken together, these findings suggest that the amount of sleep an elite athlete obtains is dictated by their training schedule. In particular, early morning starts reduce sleep duration and increase pre-training fatigue levels. When designing schedules, coaches should be aware of the implications of the timing of training sessions for sleep and fatigue. In cases where early morning starts are unavoidable, countermeasures for minimizing sleep loss - such as strategic napping during the day and correct sleep hygiene practices at night - should be considered.

  9. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach

    Science.gov (United States)

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  10. Train Stop Scheduling in a High-Speed Rail Network by Utilizing a Two-Stage Approach

    Directory of Open Access Journals (Sweden)

    Huiling Fu

    2012-01-01

    Full Text Available Among the most commonly used methods of scheduling train stops are practical experience and various “one-step” optimal models. These methods face problems of direct transferability and computational complexity when considering a large-scale high-speed rail (HSR network such as the one in China. This paper introduces a two-stage approach for train stop scheduling with a goal of efficiently organizing passenger traffic into a rational train stop pattern combination while retaining features of regularity, connectivity, and rapidity (RCR. Based on a three-level station classification definition, a mixed integer programming model and a train operating tactics descriptive model along with the computing algorithm are developed and presented for the two stages. A real-world numerical example is presented using the Chinese HSR network as the setting. The performance of the train stop schedule and the applicability of the proposed approach are evaluated from the perspective of maintaining RCR.

  11. A basic period approach to the economic lot scheduling problem with shelf life considerations

    NARCIS (Netherlands)

    Soman, C.A.; van Donk, D.P.; Gaalman, G.J.C.

    2004-01-01

    Almost all the research on the economic lot scheduling problem (ELSP) considering limited shelf life of products has assumed a common cycle approach and an unrealistic assumption of possibility of deliberately reducing the production rate. In many cases, like in food processing industry where

  12. 49 CFR 1220.6 - Schedule of records and periods of retention.

    Science.gov (United States)

    2010-10-01

    ... listed below shall be retained as determined by the management of each company. Schedule of Records and..., Stockholders and other corporate meetings Do. 3. Titles, franchises and authorities: (a) Certificates of public... agreements: (a) Service contracts, such as for operational management, accounting, financial or legal...

  13. In-season training periodization of professional soccer players

    Directory of Open Access Journals (Sweden)

    A Los Arcos

    2017-04-01

    Full Text Available The aim of this study was to quantify the seasonal perceived respiratory and muscular training loads (i.e., sRPEres-TL and sRPEmus-TL completed by elite-oriented young professional soccer players. Twentyfour players (20.3 ± 2.0 years belonging to the same reserve team of a Spanish La Liga club participated in this study. Only the players that were available to train for a whole week with the team and also to play the weekly game were considered: Starters, players that participated in the match for at least 45 min and Non- Starters, players that did not participate or played less than 45 minutes in the match. The competitive period was analysed after the division into 5x6-8 week blocks and 35x1 week microcycles. Data were also analysed with respect to number of days before the immediate match. Weekly TL variation across the in-season blocks was trivial-small for both groups except between Block 2 and Block 3 (ES= moderate. Substantial TL differences (ES= small–very likely were found between training days, the TL pattern being a progressive increase up to MD-3 followed by a decrease until MD-1. Except for the match, sRPEres-/sRPEmus-TL was very similar between Starters and Non-Starters. In summary, perceived TL across the season displayed limited variation. Coaches periodized training contents to attain the highest weekly TL 72 hours before the match to progressively unload the players between MD-3 and the match day. The data revealed that the TL arising from the weekly game was solely responsible for the observed higher weekly TL of Starters in comparison with Non-Starters.

  14. CERN Technical Training 2006: Office Software Curriculum Scheduled Course Sessions (October-December 2006)

    CERN Multimedia

    2006-01-01

    The Office Software Curriculum of the CERN Technical Training Programme currently offers comprehensive training in Microsoft Office (Word, Excel, Powerpoint, Access, Outlook), MS Project, Frontpage, Dreamweaver, Indesign, LaTeX, and CERN EDMS. There are some places available on the following Microsoft Office 2003 course sessions, currently scheduled until December 2007: EXCEL 2003 - niveau 2 : ECDL - 16-17 October (2 days, session in French) WORD 2003 (Short Course II) - HowTo... Mail merge - 2 November (morning, bilingual session) WORD 2003 (Short Course IV) - HowTo... Work with master document - 2 November (afternoon, bilingual session) OUTLOOK 2003 (Short Course III) - Meetings and Delegation - 3 November (morning, bilingual session) EXCEL 2003 (Short Course IV) - HowTo... Link cells, worksheets and workbooks - 3 November (afternoon, bilingual session) EXCEL 2003 - Level 1: ECDL - 13-14 November (2 days, session in English) ACCESS 2003 - Level 2: ECDL - 5-6 December (2 days, session in English) The abo...

  15. The Preparation Period in Basketball: Training Load and Neuromuscular Adaptations.

    Science.gov (United States)

    Ferioli, Davide; Bosio, Andrea; Bilsborough, Johann C; Torre, Antonio La; Tornaghi, Michele; Rampinini, Ermanno

    2018-01-18

    To investigate the 1) effect of the preparation period on the neuromuscular characteristics of 12 professional (PRO) and 16 semi-professional (SEMI-PRO) basketball players; 2) relationships between training load indices and changes in neuromuscular physical performance. Prior to and following the preparation period, players underwent a counter-movement jump (CMJ) test, followed by a repeated change of direction (COD) test consisting of 4 levels with increasing intensities. The peripheral neuromuscular functions of the knee extensors (peak torque, PT) were measured using electrical stimulations after each level (PT1, PT2, PT3 and PT4). Furthermore, PT Max (the highest value of PT) and PT Dec (PT decrement from PT Max to PT4) were calculated. Trivial-to-small (effect size, ES: -0.17 to 0.46) improvements were found in CMJ variables, regardless of the competitive levels. After the preparation period, peripheral fatigue induced by a COD test was similarly reduced in both PRO (PT Dec: from 27.8±21.3% to 11.4±13.7%, ES±90%CI= -0.71±0.30) and SEMI-PRO (PT Dec: from 26.1±21.9% to 10.2±8.2%, ES±90%CI= -0.69±0.32). Moderate-to-large relationships were found between session rating of perceived exertion training load and changes in PPO measured during the CMJs (r s ±90%CI: PPOabs, -0.46±0.26; PPOrel, -0.53±0.23) and in some PTs measured during the COD test (PT1, -0.45±0.26; PT2, -0.44±0.26; PT3, -0.40±0.27 and PT Max, -0.38±0.28). Preparation period induced minimal changes in the CMJ, while the ability to sustain repeated COD efforts was improved. Reaching high session rating of perceived exertion training loads might partially and negatively affect the ability to produce strength and power.

  16. Aircraft emission inventories for scheduled air traffic for the 1976-92 time period. Historical trends

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S L; Henderson, S C; Tritz, T G [Boeing Co., Seattle, WA (United States)

    1998-12-31

    Emission inventories of fuel burned, NO{sub x}, CO, and hydrocarbons have been calculated for scheduled air traffic in 1976, 1984, 1990 and 1992 on a 1 deg latitude x 1 deg longitude x 1 km pressure altitude grid. Using this database, the seasonal variation and historical trends in aircraft emissions have been calculated for selected geographical regions (e.g., North Atlantic, Europe, North America, North Pacific). The trend in emissions is a combination of the effects of passenger demand growth, improved aircraft efficiency, changes in combustor characteristics, and aircraft size. (author) 8 refs.

  17. Aircraft emission inventories for scheduled air traffic for the 1976-92 time period. Historical trends

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S.L.; Henderson, S.C.; Tritz, T.G. [Boeing Co., Seattle, WA (United States)

    1997-12-31

    Emission inventories of fuel burned, NO{sub x}, CO, and hydrocarbons have been calculated for scheduled air traffic in 1976, 1984, 1990 and 1992 on a 1 deg latitude x 1 deg longitude x 1 km pressure altitude grid. Using this database, the seasonal variation and historical trends in aircraft emissions have been calculated for selected geographical regions (e.g., North Atlantic, Europe, North America, North Pacific). The trend in emissions is a combination of the effects of passenger demand growth, improved aircraft efficiency, changes in combustor characteristics, and aircraft size. (author) 8 refs.

  18. Work Scheduling by Use of Worker Model in Consideration of Learning by On-The-Job Training

    Science.gov (United States)

    Tateno, Toshitake; Shimizu, Keiko

    This paper deals with a method of scheduling manual work in consideration of learning by on-the-job training (OJT). In skilled work such as maintenance of trains and airplanes, workers must learn many tasks by OJT. While the work processing time of novice workers is longer than that of experts, the time will be reduced with repeated OJT. Therefore, OJT is important for maintaining the skill level and the long-term work efficiency of an organization. In order to devise a schedule considering OJT, the scheduler must incorporate a management function of workers to trace dynamically changing work experience. In this paper, after the relationship between scheduling problems and worker management problems is defined, a simulation method, in which a worker model and an agent-based mechanism are utilized, is proposed to derive the optimal OJT strategy toward high long-term performance. Finally, we present some case studies showing the effectiveness of OJT planning based on the simulation.

  19. Monitoring Training Loads in Professional Basketball Players Engaged in a Periodized Training Program.

    Science.gov (United States)

    Aoki, Marcelo S; Ronda, Lorena T; Marcelino, Pablo R; Drago, Gustavo; Carling, Chris; Bradley, Paul S; Moreira, Alexandre

    2017-02-01

    Aoki, MS, Ronda, LT, Marcelino, PR, Drago, G, Carling, C, Bradley, PS, and Moreira, A. Monitoring training loads in professional basketball players engaged in a periodized training program. J Strength Cond Res 31(2): 348-358, 2017-The aim of this study was to investigate the dynamics of external training load (eTL) and internal training load (iTL) during seasonal periods, and examine the effect of a periodized training program on physical performance in professional basketball players. Repeated measures for 9 players (28 ± 6 years; 199 ± 8 cm; 101 ± 12 kg) were collected from 45 training sessions, over a 6-week preseason phase and a 5-week in-season phase. Physical tests were conducted at baseline (T1), week 4 (T2), and week 9 (T3). Differences in means are presented as % ± confident limits. A very likely difference was observed during in-season compared with preseason for the eTL variables (measured by multivariable monitoring device), mechanical load (13.5 ± 8.8) and peak acceleration (11.0 ± 11.2), respectively. Regarding iTL responses, a very large decrement in TRIMP (most likely difference, -20.6 ± 3.8) and in session rating of perceived exertion training load (very likely difference, -14.2 ± 9.0) was detected from preseason to in-season. Physical performance improved from T1 to T3 for Yo-Yo intermittent recovery test 1 (62.2 ± 34.3, effect size [ES] > 1.2); countermovement jump (8.8 ± 6.1, ES > 0.6); and squat jump (14.8 ± 10.2, ES > 0.8). Heart rate (HR; %HRpeak) exercise responses during a submaximal running test decreased from T1 to T3 (3.2 ± 4.3, ES 1.2). These results provide valuable information to coaches about training loads and physical performance across different seasonal periods. The data demonstrate that both eTL and iTL measures should be monitored in association with physical tests, to provide a comprehensive understanding of the training process.

  20. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled Course Sessions (October-December 2006)

    CERN Multimedia

    2006-01-01

    he Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the PERL, C++, OO and Java course series there are some places available on the following course sessions, scheduled until the end of this year: Object-Oriented Analysis and Design using UML: 17-19 October 2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 19-20 October 2006 (2 days) JAVA - Level 1: 30 Oct. -1 Nov. 2006 (3 days) PERL 5 - Advanced Aspects: 2 November 2006 (1 day) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16 November 2006 (3 days) JAVA - Level 2: 4-7 December 2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15 December 2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans : 18.20 December 2006 (3 days) All the above sessions will be given in English, at the CERN Training Centre....

  1. Repetition Performance And Blood Lactate Responses Adopting Different Recovery Periods Between Training Sessions In Trained Men.

    Science.gov (United States)

    Miranda, Humberto; de Freitas Maia, Marianna; Paz, Gabriel Andrade; de Souza, João A A A; Simão, Roberto; de Araújo Farias, Déborah; Willardson, Jeffrey M

    2017-02-08

    The purpose of this study was to examine the effect of different recovery periods (24h, 48h, and 72h) between repeated resistance training (RT) sessions for the upper body muscles on repetition performance and blood lactate responses in trained men. Sixteen recreationally trained men (age: 26.1 ± 3.1 years; height: 179 ± 4.5 cm; body mass: 82.6 ± 4.0 kg, 4.5 ± 2.2 years of RT experience) participated in this study. Eight-repetition maximum (8-RM) loads were determined for the bench press (BP), 30° incline bench press (BP30), and 45° incline bench press (BP45) exercises. To assess the effects of different recovery periods between repeated training sessions, three protocols were performed in randomized order, including: 24 hours (P24); 48 hours (P48); and 72 hours (P72). Each RT session consisted of performing four repetition maximum sets of BP, BP30, and BP45 with 8-RM loads and 2-minute rest intervals between sets. Blood lactate levels were measured pre-session (PRE), immediately post-session (POST), 3 minutes post-session (P3), and 5 minutes post-session (P5). For the P24 protocol, significant decreases in repetition performance were found between sessions for the BP, BP30, and BP45 exercises, respectively. When considering session 2 only, the total work (repetition x sets) was significantly higher in P48 and P72 versus P24 for the BP30 and BP45 exercises. Blood lactate levels (i.e. POST, P3, and P5) significantly increased for session 2 under the P24 compared to the P48 and P72 protocols, respectively. Therefore, coaches and practitioners who need to accomplish a higher training volume for the upper body muscles should adopt recovery periods longer than 24 hours between sessions that train the same or similar muscle groups.

  2. 49 CFR Appendix A to Part 379 - Schedule of Records and Periods of Retention

    Science.gov (United States)

    2010-10-01

    ... corporate meetings Note A. 3. Titles, franchises and authorities: (a) Certificates of public convenience and.... Contracts and agreements: (a) Service contracts, such as for operational management, accounting, financial... reasonable care in choosing retention periods, and the choice of retention periods shall reflect past...

  3. Impact of Train Schedule on Pedestrian Movement on Stairway at Suburban Rail Transit Station in Mumbai, India

    Directory of Open Access Journals (Sweden)

    Shah Jiten

    2015-01-01

    Full Text Available Pedestrian flow takes place in confined environment on stairways under the influence of composition, direction of movement, and schedule of trains. During peak-period, alighting and boarding rate is quite high resulting in very high pedestrian movement from one platform to the other to catch the next train at interchange stations. The transfer of passengers from railway platforms through common undivided stairways becomes difficult, uncomfortable, and unsafe at times when pedestrian flow reaches the capacity level. Understanding of criteria defining quality of flow that affect the effectiveness of facilities like stairways in handling the pedestrian traffic is vital for planning and designing of such facilities to ensure the desired level of service as well as safety in case of emergency. The present paper is based on the study of pedestrian movement on stairways at busy suburban rail transit interchange station at Dadar in Mumbai, India. Pedestrian movements are captured through videography at two stairways and the effect of bidirectional movement on average walking speed is analyzed. The ascending flow in small proportion is found to be more influential in causing speed reduction on undivided stairways. The outcome of the study is useful for capacity and level of service analysis while planning and designing the transit station stairways.

  4. Integrated Optimization of Service-Oriented Train Plan and Schedule on Intercity Rail Network with Varying Demand

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2015-01-01

    Full Text Available For a better service level of a train operating plan, we propose an integrated optimization method of train planning and train scheduling, which generally are optimized, respectively. Based on the cost analysis of both passengers travelling and enterprises operation, and the constraint analysis of trains operation, we construct a multiobjective function and build an integrated optimization model with the aim of reducing both passenger travel costs and enterprise operating costs. Then, a solving algorithm is established based on the simulated annealing algorithm. Finally, using as an example the Changzhutan intercity rail network, as an example we analyze the optimized results and the influence of the model parameters on the results.

  5. SOME BIOCHEMICAL BLOOD CONSTANTS EVOLUTION IN REPORT TO THE TRAINING SCHEDULE STAGE IN SPORT HORSES

    Directory of Open Access Journals (Sweden)

    FLAVIA BOCHIS

    2008-10-01

    Full Text Available To determine whether a clinical examination was adequate to assess the fitness of horses in a fence course riding, and to characterize the relationship between a clinical assessment of the horse's fitness, training schedule stage and its blood biochemistry, 22 horses were monitored before (S1, during training, immediately after warming-up (S2 and after an E level fence obstacle course ride (S3. The blood samples were taken from the jugular vein in the above three mentioned phases, for the determination of total protein (g/dl, nitrogen (mg/dl, glucose (mg/dl, lactic acid (nmol/l, calcium (mg/dl, cholesterol (mg/dl and phosphorus (mg/dl. The intend of the paper is to present the obtained results as a reference study for the appropriate use by clinicians, sport horses owners and trainers in view to have a solid base in evaluation, for the adequate protection of health and welfare of the jumper horses competitors.

  6. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled Course Sessions (August-December 2006)

    CERN Multimedia

    2006-01-01

    The Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the PERL, C++, OO and Java course series there are some places available on the following course sessions, scheduled until the end of this year: PERL 5 - Introduction: 31.8-1.9.2006 (2 days) C++ for Particle Physicists: 16-20.10.2006 (6 half days, the popular course given by Paul Kunz) Object-Oriented Analysis and Design using UML: 17-19.10.2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 19-20.10.2006 (2 days) JAVA - Level 1: 30.10-1.11.2006 (3 days) PERL 5 - Advanced Aspects: 2.11.2006 (1 day) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16.11.2006 (3 days) JAVA - Level 2: 4-7.12.2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15.12.2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBea...

  7. CERN Technical Training 2006: Software and System Technologies Curriculum - Scheduled Course Sessions (October 2006-March 2007)

    CERN Multimedia

    2006-01-01

    The Software and System Technologies Curriculum of the CERN Technical Training Programme offers comprehensive training in C++, Java, Perl, Python, XML, OO programming, JCOP/PVSS, database design and Oracle. In the Oracle, C++, OO and Java course series there are some places available on the following course sessions, currently scheduled until March 2007: Object-Oriented Analysis and Design using UML: 17-19 October 2006 (3 days) JAVA - Level 1: 30 October - 1 November 2006 (3 days) C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming: 14-16 November 2006 (3 days) Oracle Database Server Administration: 23-29 November 2007 (5 days) JAVA - Level 2: 4-7 December 2006 (4 days) C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls: 12-15 December 2006 (4 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 18-20 December 2006 (3 days) JAVA 2 Enterprise Edition - Part 1: Web Applications: 15-16 January 2007 (2 days) C++ Programming Part 3 - Templates and the STL (St...

  8. 18 CFR 225.3 - Schedule of records and periods of retention.

    Science.gov (United States)

    2010-04-01

    .... Accountants' and auditors' reports. Information Technology Management 5. Automatic data processing records.... 33. Revenue summaries. Tax 34. Tax records. Treasury 35. Statements of funds and deposits. 36... periods as contracts to which they relate. 4. Accountants' and auditors' reports: (a) Reports of...

  9. Effect of runway training on rat brain tyrosine hydroxylase: differential effect of continuous and partial reinforcement schedules.

    Science.gov (United States)

    Boarder, M R; Feldon, J; Gray, J A; Fillenz, M

    1979-12-01

    Previous experiments have implicated ascending noradrenergic systems in the development of the behavioural responses to different patterns of reward. In this report food deprived male Sprague--Dawley rats were trained to run a straight alley for good reward on a continuous reinforcement (CRF) or a partial reinforcement (PRF) schedule. Tyrosine hydroxylase measured in a partially solubilized preparation from hippocampus and hypothalamus at the end of acquisition was not different from controls, indicating that enzyme induction does not occur during either training schedules. However, hippocampal synaptosomal tyrosine hydroxylation rates from the CRF group was significantly higher than from either the PRF group or the handled controls. This indicates that at the end of the acquisition schedule the noradrenergic projection to hippocampus was more active in the CRF group than with the PRF group or the handled control.

  10. Self-education activities features of primary school teachers in the period between training courses.

    Directory of Open Access Journals (Sweden)

    Nalyvaiko G.V.

    2011-08-01

    Full Text Available The article describes self-education activities features of primary school teachers in the period between training courses. The basic conditions and areas of self-education activities features of primary school teachers in the period between training courses is singled out. The interpretations of the self-education definition are considered. The primary school teachers' self-education activities components are carried out. The period between training courses in training primary school teachers is defined.

  11. Evaluation of interactive computerized training to teach parents to implement photographic activity schedules with children with autism spectrum disorder.

    Science.gov (United States)

    Gerencser, Kristina R; Higbee, Thomas S; Akers, Jessica S; Contreras, Bethany P

    2017-07-01

    Training parents of children with autism spectrum disorder can be a challenge due to limited resources, time, and money. Interactive computerized training (ICT)-a self-paced program that incorporates instructions, videos, and interactive questions-is one method professionals can use to disseminate trainings to broader populations. This study extends previous research on ICT by assessing the effect of ICT to teach three parents how to implement a photographic activity schedule using a systematic prompting procedure with their child. Following ICT, all parents increased their fidelity to implementation of an activity schedule during role-play sessions with an adult. Fidelity remained high during implementation with their child and maintained during a 2-week follow-up. © 2017 Society for the Experimental Analysis of Behavior.

  12. Speed Synchronization Control of Integrated Motor–Transmission Powertrain over CAN through Active Period-Scheduling Approach

    Directory of Open Access Journals (Sweden)

    Wanke Cao

    2017-11-01

    Full Text Available This paper deals with the speed synchronization control of integrated motor–transmission (IMT powertrain systems in pure electric vehicles (EVs over a controller area network (CAN subject to both network-induced delays and network congestion. A CAN has advantages over point-to-point communication; however, it imposes network-induced delays and network congestion into the control system, which can deteriorate the shifting quality and make system integration difficult. This paper presents a co-design scheme combining active period scheduling and discrete-time slip mode control (SMC to deal with both network-induced delays and network congestion of the CAN, which improves the speed synchronization control for high shifting quality and prevents network congestion for the system’s integration. The results of simulations and hardware-in-loop experiments show the effectiveness of the proposed scheme, which can ensure satisfactory speed synchronization performance while significantly reducing the network’s utilization.

  13. A new approach for solving capacitated lot sizing and scheduling problem with sequence and period-dependent setup costs

    Directory of Open Access Journals (Sweden)

    Imen Chaieb Memmi

    2013-09-01

    Full Text Available Purpose: We aim to examine the capacitated multi-item lot sizing problem which is a typical example of a large bucket model, where many different items can be produced on the same machine in one time period. We propose a new approach to determine the production sequence and lot sizes that minimize the sum of start up and setup costs, inventory and production costs over all periods.Design/methodology/approach: The approach is composed of three steps. First, we compute a lower bound on total cost. Then we propose a three sub-steps iteration procedure. We solve optimally the lot sizing problem without considering products sequencing and their cost. Then, we determine products quantities to produce each period while minimizing the storage and variable production costs. Given the products to manufacture each period, we determine its correspondent optimal products sequencing, by using a Branch and Bound algorithm. Given the sequences of products within each period, we evaluate the total start up and setup cost. We compare then the total cost obtained to the lower bound of the total cost. If this value riches a prefixed value, we stop. Otherwise, we modify the results of lot sizing problem.Findings and Originality/value: We show using an illustrative example, that the difference between the total cost and its lower bound is only 10%. This gap depends on the significance of the inventory and production costs and the machine’s capacity. Comparing the approach we develop with a traditional one, we show that we manage to reduce the total cost by 30%.Research limitations/implications: Our model fits better to real-world situations where production systems run continuously. This model is applied for limited number of part types and periods.Practical implications: Our approach determines the products to manufacture each time period, their economic amounts, and their scheduling within each period. This outcome should help decision makers bearing expensive

  14. MODELLING TEMPORAL SCHEDULE OF URBAN TRAINS USING AGENT-BASED SIMULATION AND NSGA2-BASED MULTIOBJECTIVE OPTIMIZATION APPROACHES

    Directory of Open Access Journals (Sweden)

    M. Sahelgozin

    2015-12-01

    Full Text Available Increasing distances between locations of residence and services leads to a large number of daily commutes in urban areas. Developing subway systems has been taken into consideration of transportation managers as a response to this huge amount of travel demands. In developments of subway infrastructures, representing a temporal schedule for trains is an important task; because an appropriately designed timetable decreases Total passenger travel times, Total Operation Costs and Energy Consumption of trains. Since these variables are not positively correlated, subway scheduling is considered as a multi-criteria optimization problem. Therefore, proposing a proper solution for subway scheduling has been always a controversial issue. On the other hand, research on a phenomenon requires a summarized representation of the real world that is known as Model. In this study, it is attempted to model temporal schedule of urban trains that can be applied in Multi-Criteria Subway Schedule Optimization (MCSSO problems. At first, a conceptual framework is represented for MCSSO. Then, an agent-based simulation environment is implemented to perform Sensitivity Analysis (SA that is used to extract the interrelations between the framework components. These interrelations is then taken into account in order to construct the proposed model. In order to evaluate performance of the model in MCSSO problems, Tehran subway line no. 1 is considered as the case study. Results of the study show that the model was able to generate an acceptable distribution of Pareto-optimal solutions which are applicable in the real situations while solving a MCSSO is the goal. Also, the accuracy of the model in representing the operation of subway systems was significant.

  15. Peculiarities of perfection of training process of the qualified bodybuilder in the competitive period

    Directory of Open Access Journals (Sweden)

    V.Yu. Dzhym

    2015-02-01

    Full Text Available Purpose: study methods of improving the training process of skilled bodybuilders in the competitive period. Material : The study involved 18 athletes aged 18-25 years old. The experiment was conducted for 8 weeks. Used two variants of training techniques: large percentage weights; with smooth dynamics with emphasis on static load muscles. Efficacy was evaluated using the preparation method of expert evaluations. The method involved the use of information on the implementation of directives coach dynamics of power and endurance performance, subjective indicators (health, mood, desire to train. Results : comparative characteristic of the most commonly used methods of training process in bodybuilding. Developed and justified best practices, depending on the initial form of the athlete at the beginning of the competition period of training. Shows the dependence of changes in body weight of the athlete training. Conclusions : the proposed best practices, depending on the microcycle training in the competitive period (precompetitive and competitive mesocycles.

  16. Importance of Performing Experience in Strength Training Periodization

    Directory of Open Access Journals (Sweden)

    Novosád Adrián

    2017-05-01

    Full Text Available Proper mastering of a training means seems to be an important determinant of the quality of strength training. Aim of the paper is to examine the differences in strength in relation to squat-performing experience and to offer a way of improving performance by means of increasing the quality of squat technique. Methods 1. Subjects were divided into two groups according to their previous experience with performing squat: a group of inexperienced (n = 9; age: 21.1 years ± 2.37; height: 179.2 cm ± 8.18; weight: 70.0 kg ± 7.38 and experienced (n = 9; age: 24.0 years ± 1.07; height: 182.1 cm ± 4.14; weight: 81.2 kg ± 4.29. We carried out a test of maximal isometric strength in deep squat (ISOmax50° and a modified diagnostic set (Fitro Force Plate which consisted of repetitions of heel raised deep squats with a gradually increasing external loading (FmaxBW+(0-100%. Posture and the body segments of the participants were not corrected during these tests. Mann-Whitney U test (α=0.05 was used to evaluate the data obtained. Results 1. After comparing the differences in the maximal value of force curve in dynamic muscular mode (FmaxBW+(0-100% and the maximal isometric force in deep squat (ISOmax50° between the groups we found significantly bigger differences in the group of experienced when the resistance represented +75 % (Δ 279.0 N and +100 % of body weight (Δ 332.2 N. Methods 2. Eleven inexperienced subjects (age: 22.1 years ± 1.52; weight: 78.2 kg ± 2.84 completed a short term experiment (with 4 training sessions in weeklong microcycle. The purpose was to practise deep squat without any content of targeted strength development.

  17. Erratum to ''Johnson's algorithm : A key to solve optimally or approximately flowshop scheduling problems with unavailability periods'' [International Journal of Production Economics 121 (2009) 81-87

    OpenAIRE

    Rapine , Christophe

    2013-01-01

    International audience; In Allaoui H., Artiba A, ''Johnson's algorithm : A key to solve optimally or approximately flowshop scheduling problems with unavailability periods'' [International Journal of Production Economics 121 (2009)] the authors propose optimality conditions for the Johnson sequence in presence of one unavailability period on the first machine and pretend for a performance guarantee of 2 when several unavailability periods may occur. We establish in this note that these condit...

  18. Sprint Running Performance and Technique Changes in Athletes During Periodized Training: An Elite Training Group Case Study.

    Science.gov (United States)

    Bezodis, Ian N; Kerwin, David G; Cooper, Stephen-Mark; Salo, Aki I T

    2017-11-15

    To understand how training periodization influences sprint performance and key step characteristics over an extended training period in an elite sprint training group. Four sprinters were studied during five months of training. Step velocities, step lengths and step frequencies were measured from video of the maximum velocity phase of training sprints. Bootstrapped mean values were calculated for each athlete for each session and 139 within-athlete, between-session comparisons were made with a repeated measures ANOVA. As training progressed, a link in the changes in velocity and step frequency was maintained. There were 71 between-session comparisons with a change in step velocity yielding at least a large effect size (>1.2), of which 73% had a correspondingly large change in step frequency in the same direction. Within-athlete mean session step length remained relatively constant throughout. Reductions in step velocity and frequency occurred during training phases of high volume lifting and running, with subsequent increases in step velocity and frequency happening during phases of low volume lifting and high intensity sprint work. The importance of step frequency over step length to the changes in performance within a training year was clearly evident for the sprinters studied. Understanding the magnitudes and timings of these changes in relation to the training program is important for coaches and athletes. The underpinning neuro-muscular mechanisms require further investigation, but are likely explained by an increase in force producing capability followed by an increase in the ability to produce that force rapidly.

  19. The effects of plyometric training followed by detraining and reduced training periods on explosive strength in adolescent male basketball players.

    Science.gov (United States)

    Santos, Eduardo J A M; Janeira, Manuel A A S

    2011-02-01

    The aims of this study were to determine the effects of (a) plyometric training on explosive strength indicators in adolescent male basketball players and (b) detraining and reduced training on previously achieved explosive strength gains. Two groups were formed: an experimental and a control group. The former was submitted to a 10-week in-season plyometric training program, twice weekly, along with regular basketball practice. Simultaneously, the control group participated in regular basketball practice only. At the end of this period, the experimental group was subdivided into 2 groups: a reduced training group and a detraining group. All participants were assessed on squat jump, countermovement jump, Abalakov test, depth jump, mechanical power, and medicine ball throw at the beginning and at the end of the 10-week in-season plyometric training and on weeks 4, 8, 12, and 16 of the in-season detraining and reduced training periods. In the first phase of the study, the experimental group significantly increased all the assessed indicators (p training showed positive effects on upper- and lower-body explosive strength in adolescent male basketball players. Moreover, we can state that both detraining and a reduced training program indistinctly contribute to maintenance of strength levels. These results highlight the unique power that basketball-specific training seems to have on the sustainability and maintenance of sport performance.

  20. Elevated Serum Hepcidin Levels during an Intensified Training Period in Well-Trained Female Long-Distance Runners.

    Science.gov (United States)

    Ishibashi, Aya; Maeda, Naho; Sumi, Daichi; Goto, Kazushige

    2017-03-14

    Iron is essential for providing oxygen to working muscles during exercise, and iron deficiency leads to decreased exercise capacity during endurance events. However, the mechanism of iron deficiency among endurance athletes remains unclear. In this study, we compared iron status between two periods involving different training regimens. Sixteen female long-distance runners participated. Over a seven-month period, fasting blood samples were collected during their regular training period (LOW; middle of February) and during an intensified training period (INT; late of August) to determine blood hematological, iron, and inflammatory parameters. Three-day food diaries were also assessed. Body weight and lean body mass did not differ significantly between LOW and INT, while body fat and body fat percentage were significantly lower in INT ( p daily diet were significantly higher during INT than LOW ( p daily intake of iron.

  1. Case study: Nutrition and training periodization in three elite marathon runners.

    Science.gov (United States)

    Stellingwerf, Trent

    2012-10-01

    Laboratory-based studies demonstrate that fueling (carbohydrate; CHO) and fluid strategies can enhance training adaptations and race-day performance in endurance athletes. Thus, the aim of this case study was to characterize several periodized training and nutrition approaches leading to individualized race-day fluid and fueling plans for 3 elite male marathoners. The athletes kept detailed training logs on training volume, pace, and subjective ratings of perceived exertion (RPE) for each training session over 16 wk before race day. Training impulse/load calculations (TRIMP; min × RPE = load [arbitrary units; AU]) and 2 central nutritional techniques were implemented: periodic low-CHO-availability training and individualized CHO- and fluid-intake assessments. Athletes averaged ~13 training sessions per week for a total average training volume of 182 km/wk and peak volume of 231 km/wk. Weekly TRIMP peaked at 4,437 AU (Wk 9), with a low of 1,887 AU (Wk 16) and an average of 3,082 ± 646 AU. Of the 606 total training sessions, ~74%, 11%, and 15% were completed at an intensity in Zone 1 (very easy to somewhat hard), Zone 2 (at lactate threshold) and Zone 3 (very hard to maximal), respectively. There were 2.5 ± 2.3 low-CHO-availability training bouts per week. On race day athletes consumed 61 ± 15 g CHO in 604 ± 156 ml/hr (10.1% ± 0.3% CHO solution) in the following format: ~15 g CHO in ~150 ml every ~15 min of racing. Their resultant marathon times were 2:11:23, 2:12:39 (both personal bests), and 2:16:17 (a marathon debut). Taken together, these periodized training and nutrition approaches were successfully applied to elite marathoners in training and competition.

  2. Elevated Serum Hepcidin Levels during an Intensified Training Period in Well-Trained Female Long-Distance Runners

    Directory of Open Access Journals (Sweden)

    Aya Ishibashi

    2017-03-01

    Full Text Available Iron is essential for providing oxygen to working muscles during exercise, and iron deficiency leads to decreased exercise capacity during endurance events. However, the mechanism of iron deficiency among endurance athletes remains unclear. In this study, we compared iron status between two periods involving different training regimens. Sixteen female long-distance runners participated. Over a seven-month period, fasting blood samples were collected during their regular training period (LOW; middle of February and during an intensified training period (INT; late of August to determine blood hematological, iron, and inflammatory parameters. Three-day food diaries were also assessed. Body weight and lean body mass did not differ significantly between LOW and INT, while body fat and body fat percentage were significantly lower in INT (p < 0.05. Blood hemoglobin, serum ferritin, total protein, and iron levels, total iron-binding capacity, and transferrin saturation did not differ significantly between the two periods. Serum hepcidin levels were significantly higher during INT than LOW (p < 0.05. Carbohydrate and iron intakes from the daily diet were significantly higher during INT than LOW (p < 0.05. In conclusion, an elevated hepcidin level was observed during an intensified training period in long-distance runners, despite an apparently adequate daily intake of iron.

  3. The influence of training on the attentional blink and psychological refractory period.

    Science.gov (United States)

    Garner, K G; Tombu, M N; Dux, P E

    2014-05-01

    A growing body of research suggests that dual-task interference in sensory consolidation (e.g., the attentional blink, AB) and response selection (e.g., the psychological refractory period, PRP) stems from a common central bottleneck of information processing. With regard to response selection, it is well known that training reduces dual-task interference. We tested whether training that is known to be effective for response selection can also reduce dual-task interference in sensory consolidation. Over two experiments, performance on a PRP paradigm (Exp. 1) and on AB paradigms (differing in their stimuli and task demands, Exps. 1 and 2) was examined after participants had completed a relevant training regimen (T1 practice for both paradigms), an irrelevant training regimen (comparable sensorimotor training, not related to T1 for both tasks), a visual-search training regimen (Exp. 2 only), or after participants had been allocated to a no-training control group. Training that had shown to be effective for reducing dual-task interference in response selection was also found to be effective for reducing interference in sensory consolidation. In addition, we found some evidence that training benefits transferred to the sensory consolidation of untrained stimuli. Collectively, these findings show that training benefits can transfer across cognitive operations that draw on the central bottleneck in information processing. These findings have implications for theories of the AB and for the design of cognitive-training regimens that aim to produce transferable training benefits.

  4. Improving the training process of highly skilled bodybuilders in the preparatory period, general preparatory phase

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskyy

    2015-10-01

    Full Text Available Purpose: to improve the method of training highly skilled bodybuilders. Material and Methods: the study involved eight highly skilled athletes, members of the team of Ukraine on bodybuilding. Results: comparative characteristics of the most commonly used methods of training process in bodybuilding. Developed and substantiated the optimal method of training highly skilled bodybuilders during the general preparatory phase of the preparatory period, which can increase body weight through muscle athletes component. Conclusions: dynamic load factor to raise the intensity of training loads allows orientation help to increase volumes shoulder muscles

  5. Improving the training process of highly skilled bodybuilders in the preparatory period, general preparatory phase

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskyy

    2015-08-01

    Full Text Available Purpose: to improve the method of training highly skilled bodybuilders during the general preparatory phase. Material and Methods: the study involved eight highly skilled athletes, members of the team of Ukraine on bodybuilding. Results: comparative characteristics of the most commonly used methods of training process in bodybuilding. Developed and substantiated the optimal method of training highly skilled bodybuilders during the general preparatory phase of the preparatory period, which can increase body weight through muscle athletes component. Conclusions: based on studies, recommended the optimum method of training highly skilled bodybuilders depending on mezotsykles and microcycles general preparatory phase

  6. Medicare program; payment policies under the physician fee schedule, five-year review of work relative value units, clinical laboratory fee schedule: signature on requisition, and other revisions to part B for CY 2012. Final rule with comment period.

    Science.gov (United States)

    2011-11-28

    This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.

  7. Construction training process of highly skilled players in mini-football for competition period

    Directory of Open Access Journals (Sweden)

    Stasiuk I.I.

    2013-08-01

    Full Text Available Analyzed the structure and content of the competition period in mini-football. It was determined that the structure of the competition period consists of 4 competitive mesocycles. In each mesocycle includes various types of micro-cycles (competitive, cross-game and rehabilitation. Reflects the ratio of specific and non-specific (general preparations means training work. So in the competitive period for competitive mesocycles general preparations exercises ranged from 38.3 to 42.4%, special-preparation - from 29.9 to 32.6%, competitive - from 20.9 to 23.3%. The intensity of the training load in intergame microcycles less than competitive. This corresponds to the strategy of building the training process in the competitive period. During the competition period the ratio of the training load was: aerobic focus - 49.2%, mixed - 46.1%, anaerobic alactate - 2.4%, anaerobic glycolytic - 2.3%. Defines the scope and focus of the training load: longer the aerobic work, then - mixed, anaerobic- alactate and anaerobic-glycolytic. The comparative characteristics of the intensity of the training load in competitive and intergame microcycles.

  8. Training in the Public Sector in a Period of Austerity: The Case of the UK

    Science.gov (United States)

    Jewson, Nick; Felstead, Alan; Green, Francis

    2015-01-01

    This article examines what has happened to training in public sector organisations in the UK in a period of austerity. It draws on individual-level data collected over the period 2000-2012 and establishment-level data collected from employer surveys carried out between 2005 and 2012. To understand these data further, 75 qualitative interviews with…

  9. Influence of the freight transnational rail liner service on the train scheduling in case of major corridors

    Directory of Open Access Journals (Sweden)

    Mihaela POPA

    2013-01-01

    Full Text Available In this paper we discuss several consequences of the freight transnational rail liner service on the rail corridor capacity. The Northern part of the IVth TEN-T corridor on Romanian territory has specific feature related to the passenger flows connecting important Romanian demographic and economic clusters, on one side, and on the other side, to its diagonal crossing aspect, from the Western border to the Constanta port, connecting the Central Europe countries to the Black Sea regions, which means that there are a lot of expectation in terms of this corridor rail capacity: this corridor will, be for a long time further, the single and first completed continuous upgraded and modernised rail corridor. Its utilization will necessarily be heterogeneously planned (meaning for passengers rapid trains and freight rapid trains, from domestic/internal market, but especially for external market of Romania. In this paper, we consider a simple mathematical model for the calculus of capacity in two different cases: for a homogeneous utilization, meaning that all trains have the same running speeds and for heterogeneous utilization, when the passenger trains have the higher speed and hence, the higher priority over the freight trains, even if some of them are freight transnational liner service. Special feature of liner rail service has to be considered (fixed schedule, no stops for passenger train advance. We draw several useful possible solutions to be considered in order to preserve the active corridor capacity, and to assure a smooth flow for the transnational liner services, which ultimately will enhance the rail attractiveness.

  10. Improving the training process of skilled bodybuilders in specially-preparatory phase of the preparatory period

    Directory of Open Access Journals (Sweden)

    Viktor Dzhym

    2014-12-01

    Full Text Available Purpose: to study methods of improving the training process of skilled bodybuilders in a specially-preparatory phase of the preparatory period. Materials and Methods: the study involved 18 skilled bodybuilders are included in the team of the Kharkiv region of bodybuilding. Results: a comparative characteristic of the most commonly used methods of training process in bodybuilding. Developed and justified the optimal technique for skilled bodybuilders, depending on the initial form of the athlete at the beginning of a specially-preparatory phase of training. Shows the dependence of changes in body weight bodybuilder from the training process. Conclusions: on the basis of the research the author proposes an optimal method of training depending on the training microcycle in the run specially-preparatory stage.

  11. Comparison of Powerlifting Performance in Trained Men Using Traditional and Flexible Daily Undulating Periodization.

    Science.gov (United States)

    Colquhoun, Ryan J; Gai, Christopher M; Walters, Jeoffrey; Brannon, Andrew R; Kilpatrick, Marcus W; DʼAgostino, Dominic P; Campbell, Bill I

    2017-02-01

    Colquhoun, RJ, Gai, CM, Walters, J, Brannon, AR, Kilpatrick, MW, D'Agostino, DP, and Campbell, WI. Comparison of powerlifting performance in trained men using traditional and flexible daily undulating periodization. J Strength Cond Res 31(2): 283-291, 2017-Daily undulating periodization (DUP) is a growing trend, both in practice and in the scientific literature. A new form of DUP, flexible daily undulating periodization (FDUP), allows for athletes to have some autonomy by choosing the order of their training. The purpose of this study was to compare an FDUP model to a traditional model of DUP on powerlifting performance in resistance-trained men. Twenty-five resistance-trained men were randomly assigned to one of 2 groups: FDUP (N = 14) or DUP (N = 11). All participants possessed a minimum of 6 months of resistance training experience and were required to squat, bench press, and deadlift 125, 100, and 150% of their body mass, respectively. Dependent variables assessed at baseline and after the 9-week training program included bench press 1 repetition maximum (1RM), squat 1RM, deadlift 1RM, powerlifting total, Wilks Coefficient, fat mass, and fat-free mass (FFM). Dependent variables assessed during each individual training session were motivation to train, Session Rating of Perceived Exertion (Session RPE), and satisfaction with training session. After the 9-week training program, no significant differences in intensity or volume were found between groups. Both groups significantly improved bench press 1RM (FDUP: +6.5 kg; DUP: +8.8 kg), squat 1RM (FDUP: +15.6 kg; DUP: +18.0 kg), deadlift 1RM (FDUP: +14.8 kg; DUP: +13.6 kg), powerlifting total (FDUP: +36.8 kg; DUP: +40.4 kg), and Wilks Coefficient (FDUP: +24.8; DUP: +26.0) over the course of study (p = <0.001 for each variable). There was also a significant increase in FFM (FDUP: +0.8 kg; DUP: +0.8 kg) for both groups (p = 0.003). There were no differences in motivation to train, session RPE, or satisfaction with

  12. Effects of combined linear and nonlinear periodic training on physical fitness and competition times in finswimmers.

    Science.gov (United States)

    Yu, Kyung-Hun; Suk, Min-Hwa; Kang, Shin-Woo; Shin, Yun-A

    2014-10-01

    The purpose of this study was to investigate the effect of combined linear and nonlinear periodic training on physical fitness and competition times in finswimmers. The linear resistance training model (6 days/week) and nonlinear underwater training (4 days/week) were applied to 12 finswimmers (age, 16.08± 1.44 yr; career, 3.78± 1.90 yr) for 12 weeks. Body composition measures included weight, body mass index (BMI), percent fat, and fat-free mass. Physical fitness measures included trunk flexion forward, trunk extension backward, sargent jump, 1-repetition-maximum (1 RM) squat, 1 RM dead lift, knee extension, knee flexion, trunk extension, trunk flexion, and competition times. Body composition and physical fitness were improved after the 12-week periodic training program. Weight, BMI, and percent fat were significantly decreased, and trunk flexion forward, trunk extension backward, sargent jump, 1 RM squat, 1 RM dead lift, and knee extension (right) were significantly increased. The 50- and 100-m times significantly decreased in all 12 athletes. After 12 weeks of training, all finswimmers who participated in this study improved their times in a public competition. These data indicate that combined linear and nonlinear periodic training enhanced the physical fitness and competition times in finswimmers.

  13. Determining the effect of periodic training on the basic psychomotor skills of nursing students.

    Science.gov (United States)

    Öztürk, Deniz; Çalışkan, Nurcan; Baykara, Zehra Gocmen; Karadağ, Ayise; Karabulut, Hatice

    2015-02-01

    Basic psychomotor skill training starts in the first year in nursing education. The psychomotor skills taught in the first year of nursing training constitute a foundation for all professional practices. Conducting periodic training for skills with which students are deficient can support mastery learning. The study was conducted as an interventional study for determining the effect of periodic training on the basic psychomotor skills learned in the Fundamentals of Nursing course. The sample consisted of 70 students attending the Fundamentals of Nursing course at nursing students in a university in Ankara, over 4 years between 2010 and 2013. The study was conducted as an interventional study for a period of 4 years. The data were collected through a questionnaire that was applied 4 times at the end of each academic year. According to the results of the forms evaluated at the end of each year, 4 additional laboratory activities were conducted addressing the deficient psychomotor skills of students at the beginning of the new academic semester in the 2nd and 3rd years. In the 4th-year clinic practice, courses were arranged to practice still deficient psychomotor skills. It was determined that students practiced nearly all of the basic psychomotor skills during clinical practice and that the practices with which they felt themselves to be inadequate gradually decreased following periodic training; this decrease was significant (ppsychomotor skills of nursing students was effective. We recommend that students' psychomotor skills be evaluated periodically and repetitive training based on the results of this evaluation be provided throughout the undergraduate nursing education process. Copyright © 2014 Elsevier Ltd. All rights reserved.

  14. A seven day running training period increases basal urinary hepcidin levels as compared to cycling

    NARCIS (Netherlands)

    Sim, M.; Dawson, B.; Landers, G.J.; Swinkels, D.W.; Tjalsma, H.; Wiegerinck, E.T.G.; Trinder, D.; Peeling, P.

    2014-01-01

    BACKGROUND: This investigation compared the effects of an extended period of weight-bearing (running) vs. non-weight-bearing (cycling) exercise on hepcidin production and its implications for iron status. METHODS: Ten active males performed two separate exercise training blocks with either running

  15. Effect of a Periodized Power Training Program on the Functional Performances and Contractile Properties of the Quadriceps in Sprinters

    Science.gov (United States)

    Kamandulis, Sigitas; Skurvydas, Albertas; Brazaitis, Marius; Stanislovaitis, Aleksas; Duchateau, Jacques; Stanislovaitiene, Jurate

    2012-01-01

    Our purpose was to compare the effect of a periodized preparation consisting of power endurance training and high-intensity power training on the contractile properties of the quadriceps muscle and functional performances in well trained male sprinters (n = 7). After 4 weeks of high-intensity power training, 60-m sprint running time improved by an…

  16. A survey for the evaluation of the training period of cardiology specialists in Turkey.

    Science.gov (United States)

    Yıldız, Bekir Serhat; Alkan, Mustafa Beyazıt; Güngör, Hasan; Gül, Ilker; Bilgin, Murat; Akın, Mustafa; Nalbantgil, Sanem; Zoghi, Mehdi

    2011-12-01

    To evaluate postgraduate training period, social life and problems of cardiology residents in Turkey by using a questionnaire form and to compare with the core curriculum of European Society of Cardiology for general cardiology. Overall, 529 residents of cardiology ages in range of 24-35 years (mean age: 26.5±2.0 years, 81.4% male) participated as volunteers in this cross-sectional survey study. An 86-item questionnaire form was used to evaluate the education process, capacity of knowledge and skill and social effectiveness level of participants. The questionnaire were composed both closed- and open-ended questions. The questionnaire form was filled in with the face-to-face communication method. The data of survey were compared with the core curriculum of European Society of Cardiology for general cardiology training period. Chi-square or Fischer exact test was used for statistical analysis. The participants were working in various university hospitals (70.3%) and training-research (state) hospitals in 31 different provinces in Turkey (40.8% in Marmara region). They visited 40±10 outpatients and 10±5 hospitalized pts daily in the clinics. The 3-5 residents worked at the clinic on night shifts and mostly (89%) 8 or more night shifts per month were held in their first training years. During first three-years of training 76% of residents have performed echocardiography, 40.8%-transesophageal echocardiography and 10% - intraoperative echocardiography. The 84.3% of them evaluated exercise tests, 76.4%-Holter electrocardiography and 53.3%-tilt-table tests. The rate of residents working in coronary angiography laboratories was 54.3%. The 53.7% of residents performed coronary angiography and 64%-only in the 4th year of their training. The number of coronary angiography performance was under expected when compared with European Society of Cardiology curriculum. The 18.5% of residents were participated as assistant researcher in an international multi-center study and

  17. Experimental and numerical investigations of temporally and spatially periodic modulated wave trains

    Science.gov (United States)

    Houtani, H.; Waseda, T.; Tanizawa, K.

    2018-03-01

    A number of studies on steep nonlinear waves were conducted experimentally with the temporally periodic and spatially evolving (TPSE) wave trains and numerically with the spatially periodic and temporally evolving (SPTE) ones. The present study revealed that, in the vicinity of their maximum crest height, the wave profiles of TPSE and SPTE modulated wave trains resemble each other. From the investigation of the Akhmediev-breather solution of the nonlinear Schrödinger equation (NLSE), it is revealed that the dispersion relation deviated from the quadratic dependence of frequency on wavenumber and became linearly dependent instead. Accordingly, the wave profiles of TPSE and SPTE breathers agree. The range of this agreement is within the order of one wave group of the maximum crest height and persists during the long-term evolution. The findings extend well beyond the NLSE regime and can be applied to modulated wave trains that are highly nonlinear and broad-banded. This was demonstrated from the numerical wave tank simulations with a fully nonlinear potential flow solver based on the boundary element method, in combination with the nonlinear wave generation method based on the prior simulation with the higher-order spectral model. The numerical wave tank results were confirmed experimentally in a physical wave tank. The findings of this study unravel the fundamental nature of the nonlinear wave evolution. The deviation of the dispersion relation of the modulated wave trains occurs because of the nonlinear phase variation due to quasi-resonant interaction, and consequently, the wave geometry of temporally and spatially periodic modulated wave trains coincides.

  18. High-intensity preoperative training improves physical and functional recovery in the early post-operative periods after total knee arthroplasty

    DEFF Research Database (Denmark)

    Calatayud, Joaquin; Casaña, Jose; Ezzatvar, Yasmin

    2017-01-01

    the preoperative period reduces pain and improves lower limb muscle strength, ROM and functional task performance before surgery, resulting in a reduced length of stay at the hospital and a faster physical and functional recovery after TKA. The present training programme can be used by specialists to speed up......-four subjects (7 men, 37 women) scheduled for unilateral TKA for osteoarthritis (OA) during 2014 participated in this randomized controlled trial. Western Ontario and McMaster Universities Osteoarthritis Index (WOMAC), the Physical Functioning Scale of the Short Form-36 questionnaire (SF-36), a 10-cm visual...... analogue scale (VAS), isometric knee flexion, isometric knee extension, isometric hip abduction, active knee range of motion and functional tasks (Timed Up and Go test and Stair ascent-descent test) were assessed at 8 weeks before surgery (T1), after 8 weeks of training (T2), 1 month after TKA (T3...

  19. The effect of repeated periods of speed endurance training on performance, running economy and muscle adaptations

    DEFF Research Database (Denmark)

    Skovgaard, Casper; Almquist, Nicki Winfield; Bangsbo, Jens

    2018-01-01

    sessions during two 40-day periods (P1 and P2) separated by ~80 days of habitual training. Before and after both P1 and P2, subjects completed an incremental test to exhaustion to determine VO2 -max and a repeated running test at 90% vVO2 -max to exhaustion (RRT) to determine short-term endurance capacity......, with no change in P1. No changes in muscle expression of Na(+) ,K(+) -ATPase α1, α2 and β1, NHE1, SERCA1 and SERCA2, actin and CamKII were found during neither P1 nor P2. Thus, the present study demonstrates that a second period of intense training leads to improved short-term performance and further improved RE...

  20. Effect of Myostatin SNP on muscle fiber properties in male Thoroughbred horses during training period.

    Science.gov (United States)

    Miyata, Hirofumi; Itoh, Rika; Sato, Fumio; Takebe, Naoya; Hada, Tetsuro; Tozaki, Teruaki

    2017-10-20

    Variants of the Myostatin gene have been shown to have an influence on muscle hypertrophy phenotypes in a wide range of mammalian species. Recently, a Thoroughbred horse with a C-Allele at the g.66493737C/T single-nucleotide polymorphism (SNP) has been reported to be suited to short-distance racing. In this study, we examined the effect of the Myostatin SNP on muscle fiber properties in young Thoroughbred horses during a training period. To investigate the effect of the Myostatin SNP on muscle fiber before training, several mRNA expressions were relatively quantified in biopsy samples from the middle gluteal muscle of 27 untrained male Thoroughbred horses (1.5 years old) using real-time RT-PCR analysis. The remaining muscle samples were used for immunohistochemical analysis to determine the population and area of each fiber type. All measurements were revaluated in biopsy samples of the same horses after a 5-month period of conventional training. Although the expressions of Myostatin mRNA decreased in all SNP genotypes, a significant decrease was found in only the C/C genotype after training. While, expression of VEGFa, PGC1α, and SDHa mRNAs, which relate to the biogenesis of mitochondria and capillaries, was significantly higher (54-82%) in the T/T than the C/C genotypes after training. It is suggested that hypertrophy of muscle fiber is directly associated with a decrease in Myostatin mRNA expression in the C/C genotype, and that increased expressions of VEGFa, PGC1α, and SDHa in the T/T genotype might be indirectly caused by the Myostatin SNP.

  1. Progressive-overload whole-body vibration training as part of periodized, off-season strength training in trained women athletes.

    Science.gov (United States)

    Jones, Margaret T

    2014-09-01

    The purpose was to examine the effects of progressive-overload, whole-body vibration (WBV) training on strength and power as part of a 15-week periodized, strength training (ST) program. Eighteen collegiate women athletes with ≥1 year of ST and no prior WBV training participated in the crossover design. Random assignment to 1 of the 2 groups followed pretests of seated medicine ball throw (SMBT), single-leg hop for distance (LSLH, RSLH), countermovement jump (CMJ), 3 repetition maximum (3RM) front squat (FS), pull-up (PU), and 3RM bench press (BP). Whole-body vibration was two 3-week phases of dynamic and static hold body weight exercises administered 2 d·wk in ST sessions throughout the 15-week off-season program. Total WBV exposure was 6 minutes broken into 30-second bouts with 60-second rest (1:2 work-to-relief ratio). Exercises, frequency, and amplitude progressed in intensity from the first 3-week WBV training to the second 3-week phase. Repeated-measures analysis of variances were used to analyze the SMBT, CMJ, LSLH, RSLH, FS, PU, and BP tests. Alpha level was p ≤ 0.05. Front squat, LSLH, and RSLH increased (p = 0.001) from pre- to posttest; FS increased from mid- to posttest. Pull-up increased (p = 0.008) from pre- to posttest. Seated medicine ball throw and BP showed a trend of increased performance from pre- to posttest (p = 0.11). Two 3-week phases of periodized, progressive-overload WBV + ST training elicited gains in strength and power during a 15-week off-season program. Greatest improvements in performance tests occurred in the initial WBV phase. Implementing WBV in conjunction with ST appears to be more effective in the early phases of training.

  2. [VACCINE-ASSOCIATED PARALYTIC POLIOMYELITIS IN RUSSIAN FEDERATION DURING THE PERIOD OF CHANGES IN VACCINATION SCHEDULE (2006-2013 yy.)].

    Science.gov (United States)

    Ivanova, O E; Eremeeva, T P; Morozova, N S; Shakaryan, A K; Gmyl, A P; Yakovenko, M L; Korotkova, E A; Chernjavskaja, O P; Baykova, O Yu; Silenova, O V; Krasota, A Yu; Krasnoproshina, L I; Mustafina, A N; Kozlovskaja, L I

    2016-01-01

    The results of virologic testing of clinical materials and epidemiological analysis of vaccine-associated paralytic poliomyelitis (VAPP) cases obtained in 2006-2013 during AFP surveillance are presented. Among the 2976 cases of AFP 30 cases were VAPP. 15 cases were observed in OPV recipients, whereas 15 cases were observed in non-vaccinated contacts. The age of the patients varied from 4 months to 5.5 years (13.6 ± 12.4 months old). Children younger than 1 year constituted 63.3% of the group; boys were dominant (73.3%); 53.3% of children were vaccinated with OPV; the time period between receipt of OPV and onset of palsy was from 2 to 32 days (18.7 ± 8.2). Lower paraparesis was documented in 48.3% of patients; lower monoparesis in 37.9%; upper monoparesis, in 6.9%; tetraparesis with bulbar syndrome, in 6%. The majority of the patients (85.7%) had an unfavorable premorbid status. The violations of the humoral immunity were found in 73.9% cases: CVID (52.9%), hypogammaglobulinemia (41.2%); selective lgA deflciency (5.9%). In 70.6% cases damage to humoral immunity was combined with poor premorbid status. The most frequently observed (76%, p poliomyelitis in the Russian Federation, WHO Polio eradication initiative, WHO's European Regional Bureau, Russian Foundation for Basic Research (project No. 15-15-00147).

  3. The effect of repeated periods of speed endurance training on performance, running economy, and muscle adaptations.

    Science.gov (United States)

    Skovgaard, C; Almquist, N W; Bangsbo, J

    2018-02-01

    The effect of repeated intense training interventions was investigated in eight trained male runners (maximum oxygen uptake [VO 2 -max]: 59.3±3.2 mL/kg/min, mean±SD) who performed 10 speed endurance training (SET; repeated 30-seconds "all-out" bouts) and 10 aerobic moderate-intensity training sessions during two 40-day periods (P1 and P2) separated by ~80 days of habitual training. Before and after both P1 and P2, subjects completed an incremental test to exhaustion to determine VO 2 -max and a repeated running test at 90% vVO 2 -max to exhaustion (RRT) to determine short-term endurance capacity. In addition, running economy (RE) was measured at 60% vVO 2 -max (11.9±0.5 km/h) and v10-km (14.3±0.9 km/h), a 10-km track-running test was performed, and a biopsy from m. vastus lateralis was collected. 10-km performance and VO 2 -max (mL/min) were the same prior to P1 and P2, whereas RE was better (P<.05) before P2 than before P1. During P1 and P2, 10-km performance (2.9% and 2.3%), VO 2 -max (2.1% and 2.6%), and RE (1.9% and 1.8% at 60% vVO 2 -max; 1.6% and 2.0% at v10-km) improved (P<.05) to the same extent, respectively. Performance in RRT was 20% better (P<.05) after compared to before P2, with no change in P1. No changes in muscle expression of Na + ,K + -ATPase α1, α2 and β1, NHE1, SERCA1 and SERCA2, actin, and CaMKII were found during neither P1 nor P2. Thus, the present study demonstrates that a second period of intense training leads to improved short-term performance and further improved RE, whereas 10-km performance and VO 2 -max improve to the same extent as during the first period. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  4. [Job status after the resident training period in Spain. Analysis of a national survey.

    Science.gov (United States)

    García Sanz, Miguel; Rodríguez Socarrás, Moises; Tortolero Blanco, Leonardo; Pesquera-Ortega, Laura; Colombo, Juan; Gómez Rivas, Juan

    2018-01-01

    Since the establishment of specialization of medicine through the residency system, Spanish health care has sought to maintain a balance between established needs and trained professionals, with the aim of avoiding the deficit or excess of health specialists with its consequences. The objective of the present review is to know the working conditions of urologist specialists at the end of the residency training period. The results of a survey for urologist who completed their residency contract from 2012 to 2016 are presented, assessing working status, academic and working data during the first months after the completion of specialized training. A total of 42 surveys were collected. All respondents had a working contract within 6 months of completing their training. 71% had a temporary contract, most with duration of less than one year. There are more contract numbers in the public health system, although they increase progressively in the private sector. More than half of the respondents were satisfied with their work situation. The work insertion of the recently specialized urologists is high, reaching 100% within 6 months of finishing their specialization. Labor quality issues are not so positive, observing great working instability associated to a high proportion of temporary contracts lower than 6 months.

  5. 76 FR 20518 - Self-Certification and Employee Training of Mail-Order Distributors of Scheduled Listed Chemical...

    Science.gov (United States)

    2011-04-13

    ... regulated sellers--i.e., retail stores and mobile retail vendors--of scheduled listed chemical products. To... scheduled listed chemical products at retail. Sales at retail are those sales intended for personal use... available for public inspection online at http://www.regulations.gov and in the Drug Enforcement...

  6. Blood lactate recovery measurements, training, and performance during a 23-week period of competitive swimming.

    Science.gov (United States)

    Pelayo, P; Mujika, I; Sidney, M; Chatard, J C

    1996-01-01

    The purpose of this study was to relate measurements of blood lactate concentration, performance during a maximal anaerobic lactic test (MANLT) and training loads during a 23-week swimming season. Six elite 200-m freestyle male swimmers [mean age 19.5 (SD 1.6) years, height 184 (SD 5) cm and body mass 77.7 (SD 9.0) kg], participated in the study. The MANLT consisted of four all-out 50-m swims interspersed with 10-s recovery periods. Blood lactate concentrations were determined at 3 and 12-min post-exercise and were performed on weeks 2,6,10,14,18 and 21. Swimmers participated in 200-m freestyle competitions on weeks 1,7,13 and 23 (national championships). During weeks 1-10, training mostly involved aerobic exercise, while during weeks, 11-23, it involved anaerobic exercise. At 3-min and 12-min post-MANLT lactate concentrations varied throughout the season [range from 14.9 (SD 1.2) to 18.7 (SD 1.0) mmol.l-1] but demonstrated non-systematic variations. In contrast, the percentage of mean blood lactate decrease (% [La-]recovery) between min 3 and min 12 of the passive recovery post-MANLT increased from week 2 to 10 with aerobic training and decreased from week 10 to 21 with anaerobic training. The MANLT performance improved continuously throughout the season, while competition performance improved during the first three competitions but declined in the final championships, coinciding with the lowest % [La-]recovery and signs of overtraining, such as bad temper and increased sleeping heart rate. The results of this study indicated that % [La-]recovery could be an efficient marker for monitoring the impact of aerobic and anaerobic training and avoiding overtraining in elite 200-m swimmers.

  7. The relationship between the age of onset of musical training and rhythm synchronization performance: validation of sensitive period effects.

    Science.gov (United States)

    Bailey, Jennifer A; Penhune, Virginia B

    2013-01-01

    A sensitive period associated with musical training has been proposed, suggesting the influence of musical training on the brain and behavior is strongest during the early years of childhood. Experiments from our laboratory have directly tested the sensitive period hypothesis for musical training by comparing musicians who began their training prior to age seven with those who began their training after age seven, while matching the two groups in terms of musical experience (Watanabe et al., 2007; Bailey and Penhune, 2010, 2012). Using this matching paradigm, the early-trained groups have demonstrated enhanced sensorimotor synchronization skills and associated differences in brain structure (Bailey et al., 2013; Steele et al., 2013). The current study takes a different approach to investigating the sensitive period hypothesis for musical training by examining a single large group of unmatched musicians (N = 77) and exploring the relationship between age of onset of musical training as a continuous variable and performance on the Rhythm Synchronization Task (RST), a previously used auditory-motor RST. Interestingly, age of onset was correlated with task performance for those who began training earlier, however, no such relationship was observed among those who began training in their later childhood years. In addition, years of formal training showed a similar pattern. However, individual working memory scores were predictive of task performance, regardless of age of onset of musical training. Overall, these results support the sensitive period hypothesis for musical training and suggest a non-linear relationship between age of onset of musical training and auditory-motor rhythm synchronization abilities, such that a relationship exists early in childhood but then plateaus later on in development, similar to maturational growth trajectories of brain regions implicated in playing music.

  8. The relationship between the age of onset of musical training and rhythm synchronization performance: Validation of sensitive period effects

    Directory of Open Access Journals (Sweden)

    Jennifer Anne Bailey

    2013-11-01

    Full Text Available A sensitive period associated with musical training has been proposed, suggesting the influence of musical training on the brain and behaviour is strongest during the early childhood years. Experiments from our laboratory have directly tested the sensitive period hypothesis for musical training by comparing musicians who began their training before age seven with those who began their training after age seven, while matching the two groups in terms of musical experience (Bailey & Penhune, 2010; 2012; Watanabe, Savion-Lemieux, & Penhune, 2007. Using this matching paradigm, the early-trained groups have demonstrated enhanced sensorimotor synchronization skills and associated differences in brain structure (Bailey, Zatorre, & Penhune, under review; Steele, Bailey, Zatorre, & Penhune, 2013. The current study takes a different approach to investigating the sensitive period hypothesis for musical training by examining a single large group of unmatched musicians (N=77 and exploring the relationship between age of onset of musical training as a continuous variable and performance on the Rhythm Synchronization Task (RST, a previously used auditory-motor rhythm synchronization task. Interestingly, age of onset was correlated with task performance for those who began training earlier; however, no such relationship was observed among those who began training in their later childhood years. In addition, years of formal training showed a similar pattern. However, individual working memory scores were predictive of task performance, regardless of age of onset of musical training. Overall, these results support the sensitive period hypothesis for musical training and suggest a non-linear relationship between age of onset of musical training and auditory-motor rhythm synchronization abilities, such that a relationship exists early in childhood but then plateaus later on in development, similar to maturational growth trajectories of brain regions implicated in

  9. Different Training Loads Partially Influence Physiological Responses to the Preparation Period in Basketball.

    Science.gov (United States)

    Ferioli, Davide; Bosio, Andrea; La Torre, Antonio; Carlomagno, Domenico; Connolly, Darragh R; Rampinini, Ermanno

    2018-03-01

    Ferioli, D, Bosio, A, La Torre, A, Carlomagno, D, Connolly, DR, and Rampinini, E. Different training loads partially influence physiological responses to preparation period in basketball. J Strength Cond Res 32(3): 790-797, 2018-The aim of this study was to compare the session rating of perceived exertion training load (sRPE-TL), training volume (TV), and the changes in physical fitness between professional (n = 14) and semiprofessional (n = 18) basketball players during the preparation period. Furthermore, relationships between sRPE-TL and TV with changes in physical fitness level were investigated. The players performed the Yo-Yo intermittent recovery test-level 1 (Yo-Yo IR1) before and after the preparation period. In addition, physiological responses to a standardized 6-minute continuous running test (Mognoni's test) and to a standardized 5-minute high-intensity intermittent running test (HIT) were measured. Session rating of perceived exertion-TL and TV were greater for professional (5,241 ± 1787 AU; 914 ± 122 minutes) compared with semiprofessional players (2,408 ± 487 AU; 583 ± 65 minutes). Despite these differences, Yo-Yo IR1 performance improvements (∼30%) and physiological adaptations to the Mognoni's test were similar between the 2 groups. Furthermore, physiological adaptations to HIT were slightly greater for professional compared with semiprofessional players; however, the magnitude of these effects was only small/moderate. No clear relationships were found between sRPE-TL and changes in Yo-Yo IR1 performance and Mognoni's test (rs ± 90% confidence interval [CI]: Yo-Yo IR1, 0.18 ± 0.30; Mognoni's test, -0.14 ± 0.29). Only moderate relationships were found between sRPE-TL and changes in HIT (rs ± 90% CI: [La], -0.48 ± 0.23; [H], -0.42 ± 0.25). These results raise doubts on the effectiveness of using high sRPE-TL and TV during the preparation period to improve the physical fitness level of players. The Yo-Yo IR1 seems to be sensitive to

  10. On the question of periodization training content and Paralympic athletes with disorders of the musculoskeletal system in the light of the general theory of sports training

    Directory of Open Access Journals (Sweden)

    V.N. Derkach

    2014-05-01

    Full Text Available Purpose : To determine theoretically similar trends and differences in the periods of sports training athletes and Paralympic athletes with similar qualifications, without disabilities. Material : analyzed more than 80 references. Results : at present insufficiently developed periodization sports training many years to prepare athletes with disorders of the musculoskeletal system. Also - at the stage of maximum realization of individual empowerment athletes. This applies to the immediate preparation for the main competition. In the first case, periodization can be carried out on the basis of the classical theory. Also on stage, maximizing the individual capabilities. Need to adapt this theory to career achievements of athletes. Also, you must consider the disease. Conclusions : The main factors set differences training tools Paralympic athletes and physically healthy: increased attention to the psychological preparation for the Paralympics, inclusive education and sports training individualization programs already in the first stage of their training.

  11. Soliton Trains Induced by Adaptive Shaping with Periodic Traps in Four-Level Ultracold Atom Systems

    International Nuclear Information System (INIS)

    Djouom Tchenkoue, M. L.; Welakuh Mbangheku, D.; Dikandé, Alain M.

    2017-01-01

    It is well known that an optical trap can be imprinted by a light field in an ultracold-atom system embedded in an optical cavity, and driven by three different coherent fields. Of the three fields coexisting in the optical cavity there is an intense control field that induces a giant Kerr nonlinearity via electromagnetically-induced transparency, and another field that creates a periodic optical grating of strength proportional to the square of the associated Rabi frequency. In this work elliptic-soliton solutions to the nonlinear equation governing the propagation of the probe field are considered, with emphasis on the possible generation of optical soliton trains forming a discrete spectrum with well defined quantum numbers. The problem is treated assuming two distinct types of periodic optical gratings and taking into account the negative and positive signs of detunings (detuning above or below resonance). Results predict that the competition between the self-phase and cross-phase modulation nonlinearities gives rise to a rich family of temporal soliton train modes characterized by distinct quantum numbers. (paper)

  12. Soliton Trains Induced by Adaptive Shaping with Periodic Traps in Four-Level Ultracold Atom Systems

    Science.gov (United States)

    Djouom Tchenkoue, M. L.; Welakuh Mbangheku, D.; Dikandé, Alain M.

    2017-06-01

    It is well known that an optical trap can be imprinted by a light field in an ultracold-atom system embedded in an optical cavity, and driven by three different coherent fields. Of the three fields coexisting in the optical cavity there is an intense control field that induces a giant Kerr nonlinearity via electromagnetically-induced transparency, and another field that creates a periodic optical grating of strength proportional to the square of the associated Rabi frequency. In this work elliptic-soliton solutions to the nonlinear equation governing the propagation of the probe field are considered, with emphasis on the possible generation of optical soliton trains forming a discrete spectrum with well defined quantum numbers. The problem is treated assuming two distinct types of periodic optical gratings and taking into account the negative and positive signs of detunings (detuning above or below resonance). Results predict that the competition between the self-phase and cross-phase modulation nonlinearities gives rise to a rich family of temporal soliton train modes characterized by distinct quantum numbers.

  13. Aerobic Interval Exercise Training Induces Greater Reduction in Cardiac Workload in the Recovery Period in Rats

    International Nuclear Information System (INIS)

    Borges, Juliana Pereira; Masson, Gustavo Santos; Tibiriçá, Eduardo; Lessa, Marcos Adriano

    2014-01-01

    Aerobic interval exercise training has greater benefits on cardiovascular function as compared with aerobic continuous exercise training. The present study aimed at analyzing the effects of both exercise modalities on acute and subacute hemodynamic responses of healthy rats. Thirty male rats were randomly assigned into three groups as follows: continuous exercise (CE, n = 10); interval exercise (IE, n = 10); and control (C, n = 10). Both IE and CE groups performed a 30-minute exercise session. The IE group session consisted of three successive 4-minute periods at 60% of maximal velocity (Max Vel), with 4-minute recovery intervals at 40% of Max Vel. The CE group ran continuously at 50% of Max Vel. Heart rate (HR), blood pressure(BP), and rate pressure product (RPP) were measured before, during and after the exercise session. The CE and IE groups showed an increase in systolic BP and RPP during exercise as compared with the baseline values. After the end of exercise, the CE group showed a lower response of systolic BP and RPP as compared with the baseline values, while the IE group showed lower systolic BP and mean BP values. However, only the IE group had a lower response of HR and RPP during recovery. In healthy rats, one interval exercise session, as compared with continuous exercise, induced similar hemodynamic responses during exercise. However, during recovery, the interval exercise caused greater reductions in cardiac workload than the continuous exercise

  14. Aerobic Interval Exercise Training Induces Greater Reduction in Cardiac Workload in the Recovery Period in Rats

    Science.gov (United States)

    Borges, Juliana Pereira; Masson, Gustavo Santos; Tibiriçá, Eduardo; Lessa, Marcos Adriano

    2014-01-01

    Background Aerobic interval exercise training has greater benefits on cardiovascular function as compared with aerobic continuous exercise training. Objective The present study aimed at analyzing the effects of both exercise modalities on acute and subacute hemodynamic responses of healthy rats. Methods Thirty male rats were randomly assigned into three groups as follows: continuous exercise (CE, n = 10); interval exercise (IE, n = 10); and control (C, n = 10). Both IE and CE groups performed a 30-minute exercise session. The IE group session consisted of three successive 4-minute periods at 60% of maximal velocity (Max Vel), with 4-minute recovery intervals at 40% of Max Vel. The CE group ran continuously at 50% of Max Vel. Heart rate (HR), blood pressure(BP), and rate pressure product (RPP) were measured before, during and after the exercise session. Results The CE and IE groups showed an increase in systolic BP and RPP during exercise as compared with the baseline values. After the end of exercise, the CE group showed a lower response of systolic BP and RPP as compared with the baseline values, while the IE group showed lower systolic BP and mean BP values. However, only the IE group had a lower response of HR and RPP during recovery. Conclusion In healthy rats, one interval exercise session, as compared with continuous exercise, induced similar hemodynamic responses during exercise. However, during recovery, the interval exercise caused greater reductions in cardiac workload than the continuous exercise. PMID:24270864

  15. Aerobic Interval Exercise Training Induces Greater Reduction in Cardiac Workload in the Recovery Period in Rats

    Energy Technology Data Exchange (ETDEWEB)

    Borges, Juliana Pereira, E-mail: julipborges@gmail.com; Masson, Gustavo Santos; Tibiriçá, Eduardo; Lessa, Marcos Adriano [Instituto Oswaldo Cruz - FIOCRUZ, Rio de Janeiro, RJ (Brazil)

    2014-01-15

    Aerobic interval exercise training has greater benefits on cardiovascular function as compared with aerobic continuous exercise training. The present study aimed at analyzing the effects of both exercise modalities on acute and subacute hemodynamic responses of healthy rats. Thirty male rats were randomly assigned into three groups as follows: continuous exercise (CE, n = 10); interval exercise (IE, n = 10); and control (C, n = 10). Both IE and CE groups performed a 30-minute exercise session. The IE group session consisted of three successive 4-minute periods at 60% of maximal velocity (Max Vel), with 4-minute recovery intervals at 40% of Max Vel. The CE group ran continuously at 50% of Max Vel. Heart rate (HR), blood pressure(BP), and rate pressure product (RPP) were measured before, during and after the exercise session. The CE and IE groups showed an increase in systolic BP and RPP during exercise as compared with the baseline values. After the end of exercise, the CE group showed a lower response of systolic BP and RPP as compared with the baseline values, while the IE group showed lower systolic BP and mean BP values. However, only the IE group had a lower response of HR and RPP during recovery. In healthy rats, one interval exercise session, as compared with continuous exercise, induced similar hemodynamic responses during exercise. However, during recovery, the interval exercise caused greater reductions in cardiac workload than the continuous exercise.

  16. Positive performance and health effects of a football training program over 12 weeks can be maintained over a 1-year period with reduced training frequency

    DEFF Research Database (Denmark)

    Randers, Morten Bredsgaard; Nielsen, Jens Jung; Krustrup, Birgitte Rejkjær

    2010-01-01

    We examined whether improvements in the performance and health profile of an intensive 12-week football intervention could be maintained with a reduced training frequency. Seventeen healthy untrained males completed the study. Ten subjects trained 2.4 times/week for 12 weeks and another 52 weeks ...... unaltered for CG. In conclusion, positive adaptations in cardiovascular fitness obtained over 12 weeks of regular recreational football training can be maintained over a 1-year period with a reduced training frequency, with further development in musculo-skeletal fitness.......We examined whether improvements in the performance and health profile of an intensive 12-week football intervention could be maintained with a reduced training frequency. Seventeen healthy untrained males completed the study. Ten subjects trained 2.4 times/week for 12 weeks and another 52 weeks...... (P12 weeks. After 64 weeks, quadriceps muscle mass (11%), mean fiber area (10%) and citrate synthase activity (18%) were higher (P

  17. Injuries in women associated with a periodized strength training and running program.

    Science.gov (United States)

    Reynolds, K L; Harman, E A; Worsham, R E; Sykes, M B; Frykman, P N; Backus, V L

    2001-02-01

    Forty-five women participated in a 24-week physical training program designed to improve lifting, load carriage, and running performance. Activities included weightlifting, running, backpacking, lift and carry drills, and sprint running. Physicians documented by passive surveillance all training-related injuries. Thirty-two women successfully completed training program. Twenty-two women (48.9%) suffered least 1 injury during training, but only 2 women had to drop out of the study because of injuries. The rate of injury associated with lost training time was 2.8 injuries per 1,000 training hours of exposure. Total clinic visits and days lost from training were 89 and 69, respectively. Most injuries were the overuse type involving the lower back, knees, and feet. Weightlifting accounted for a majority of the lost training days. A combined strength training and running program resulted in significant performance gains in women. Only 2 out of 45 participants left the training program cause of injuries.

  18. Monitoring training load, recovery-stress state, immune-endocrine responses, and physical performance in elite female basketball players during a periodized training program.

    Science.gov (United States)

    Nunes, João A; Moreira, Alexandre; Crewther, Blair T; Nosaka, Ken; Viveiros, Luis; Aoki, Marcelo S

    2014-10-01

    This study investigated the effect of a periodized training program on internal training load (ITL), recovery-stress state, immune-endocrine responses, and physical performance in 19 elite female basketball players. The participants were monitored across a 12-week period before an international championship, which included 2 overloading and tapering phases. The first overloading phase (fourth to sixth week) was followed by a 1-week tapering, and the second overloading phase (eighth to 10th week) was followed by a 2-week tapering. ITL (session rating of perceived exertion method) and recovery-stress state (RESTQ-76 Sport questionnaire) were assessed weekly and bi-weekly, respectively. Pretraining and posttraining assessments included measures of salivary IgA, testosterone and cortisol concentrations, strength, jumping power, running endurance, and agility. Internal training load increased across all weeks from 2 to 11 (p ≤ 0.05). After the first tapering period (week 7), a further increase in ITL was observed during the second overloading phase (p ≤ 0.05). After the second tapering period, a decrease in ITL was detected (p ≤ 0.05). A disturbance in athlete stress-recovery state was noted during the second overloading period (p ≤ 0.05), before returning to baseline level in end of the second tapering period. The training program led to significant improvements in the physical performance parameters evaluated. The salivary measures did not change despite the fluctuations in ITL. In conclusion, a periodized training program evoked changes in ITL in elite female basketball players, which appeared to influence their recovery-stress state. The training plan was effective in preparing participants for competition, as indicated by improvements in recovery-stress state and physical performance after tapering.

  19. Self-certification and employee training of mail-order distributors of scheduled listed chemical products. Interim final rule with request for comment.

    Science.gov (United States)

    2011-04-13

    On October 12, 2010, the President signed the Combat Methamphetamine Enhancement Act of 2010 (MEA). It establishes new requirements for mail-order distributors of scheduled listed chemical products. Mail-order distributors must now self-certify to DEA in order to sell scheduled listed chemical products at retail. Sales at retail are those sales intended for personal use; mail-order distributors that sell scheduled listed chemical products not intended for personal use, e.g., sale to a university, are not affected by the new law. This self-certification must include a statement that the mail-order distributor understands each of the requirements that apply under part 1314 and agrees to comply with these requirements. Additionally, mail-order distributors are now required to train their employees prior to self certification. DEA is promulgating this rule to incorporate the statutory provisions and make its regulations consistent with the new requirements and other existing regulations related to self-certification.

  20. The Effectiveness of Life Skills Training on Enhancement of Self-Esteem and Marital Satisfaction among Addicts in Treatment Period

    Directory of Open Access Journals (Sweden)

    R Nooripour

    2014-11-01

    Full Text Available Objective: This study has been done to determine the impact of life skills training on enhancement of self-esteem and marital satisfaction among addicts in treatment period. Method: The research design was semi experimental pretest-posttest with witness group. For each group 12men addicts in treatment period in Qazvin city were selected by available sampling. Rosenberg self-esteem and Enrich marital satisfaction questionnaires were administered among selected samples. Training workshop was conducted on role playing, questioning and answering which was taught by psychology professors in experimental group. Results: Results showed life skills training improved self-esteem and marital satisfaction of addicts in treatment period. Conclusion: Life skills training have a positive impact on self-esteem and marital satisfaction of individuals especially on addicts in treatment period, also life skills training in the field of smoking prevention enhances individuals’ skills (such as self-esteem, marital satisfaction, etc…. Life skills training empower person to actualize his knowledge, attitudes and values, and enable him to have motivation for healthy behavior which this will have significant impact on his relationship with his wife.

  1. Effect of tapering after a period of high-volume sprint interval training on running performance and muscular adaptations in moderately trained runners

    DEFF Research Database (Denmark)

    Skovgaard, Casper; Almquist, Nicki Winfield; Kvorning, Thue

    2018-01-01

    The effect of tapering following a period of high-volume sprint interval training (SIT) and a basic volume of aerobic training on performance and muscle adaptations in moderately trained runners was examined. Eleven (8 males, 3 females) runners (maximum oxygen uptake (VO2-max): 56.8±2.9 mL·min(-1...... running test at 90% of vVO2-max to exhaustion (RRT). In addition, a biopsy from m. vastus lateralis was obtained at rest. Performance during RRT was better (P... at 60% of vVO2-max was lower (P

  2. The period between beta-blocker use and physical activity changes training heart rate behavior

    Directory of Open Access Journals (Sweden)

    Naiane Ferraz Bandeira Alves

    2009-12-01

    Full Text Available The Brazilian Society of Cardiology (SBC proposes that hypertensive subjects who use beta-blockers and practice physical exercises must have their training heart rate (HR corrected due to the negative chronotropic effect of this drug. Nevertheless, if the physical activity is performed outside of plasmatic half-life, correction may not be necessary. This study investigated the exercise chronotropic response both inside and outside the beta-blocker plasmatic half-life. Nine subjects in use of atenolol or propranolol, and six controls, carried out three walking sessions in three days according to different schedules: EX2 (two hours after drug administration, at the plasmatic peak; EX11 (eleven hours after drug administration, at the end of plasmatic half-life; and EX23 (twenty-three hours after drug administration, outside the plasmatic half-life. The walking sessions were performed on an ergometric treadmill and HR was monitored by a heart rate monitor. During the exercises, mean HRs were 97.2, 108.4 and 109 for EX2, EX11 and EX23, respectively, with the value for EX2 statistically lower than the others (p0.05. The study concludes that the attenuation of the positive chronotropic response which occurs during exercise in subjects using beta-blockers, is less evident when the exercise is performed outside the plasmatic half-life of the drug.A Sociedade Brasileira de Cardiologia (SBC propõe que os hipertensos que utilizam beta-bloqueadores e praticam exercícios físicos devem ter sua frequência cardíaca de treinamento (HR corrigida devido ao efeito cronotrópico negativo desse fármaco. Contudo, se a atividade física é realizada fora da meia-vida plasmática do fármaco, a correção pode não ser necessária. Este estudo investigou a resposta cronotrópica ao exercício dentro e fora da meia-vida plasmática do beta-bloqueador. Nove indivíduos que usavam atenolol ou propranolol e seis controles, efetuaram três sessões de caminhada em tr

  3. The Effects of the Training in the Preparation Period on the Repetitive Strength Transformation with Cadet Level Football Players

    Directory of Open Access Journals (Sweden)

    Jovan Gardašević

    2016-06-01

    Full Text Available The main aim of the research was to identify a level of quantitative changes of the repetitive strength with fifteen years old football players under the influence of the programmed football training of a six weeks preparation period. The training programme covered forty-four training units. The research was made on a sample of 120 cadet level football players. To estimate the repetitive strength three tests have been used: Lying-sed for 30 seconds, Push-ups and Lifting upper body while lying on stomach. In the area of comparative statistics, we used discriminant parametric procedure t-test for big paired samples. It can be concluded that there are statistically significant differences in all three variables to estimate the repetitive strength. This confirmed the hypothesis that the expected significant positive quantitative changes of basic-motor abilities influenced by the proposed model of training in preparation period with fifteen years old football players. The authors were guided by the fact that this kind of training program in preparation period is very effective in terms of raising the repetitive strength level with fifteen years old. The obtained results can be directed towards innovation plans and programs in the preparation period, and the adaptation of the same needs of the respective population.

  4. Medicare program; revisions to payment policies under the Physician Fee Schedule, Clinical Laboratory Fee Schedule, access to identifiable data for the Center for Medicare and Medicaid Innovation Models & other revisions to Part B for CY 2015. Final rule with comment period.

    Science.gov (United States)

    2014-11-13

    This major final rule with comment period addresses changes to the physician fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. See the Table of Contents for a listing of the specific issues addressed in this rule.

  5. HIT maintains performance during the transition period and improves next season performance in well-trained cyclists.

    Science.gov (United States)

    Rønnestad, Bent R; Askestad, Arild; Hansen, Joar

    2014-09-01

    To investigate the effects of combining low-intensity endurance training (LIT) with one high-intensity endurance training (HIT) session every 7-10 days (EXP, n = 7) vs. traditional approach focusing on LIT (TRAD, n = 6) during the transition period. The effects of different training strategies during the transition period were investigated after the transition period and at the beginning of the subsequent competition season. Well-trained cyclists were tested after the competition season, after an 8-week transition period, and after a 16-week preparatory period, before the subsequent competition season. The only difference between groups was a larger time with HIT during the transition phase in EXP. It was very likely that EXP had a larger impact on power output at 4 mmol L(-1) [la(-)] after both the transition period and after the preparatory period than TRAD [between-group change (90% CI): 10.6% (8.2%) and 12.9% (11.9%), respectively]. It was very likely that EXP had a larger impact on mean power output in the 40-min all-out trial after the transition period than TRAD [between-group change 12.4% (7.6%)]. EXP was also likely to have a larger improvement in the 40-min trial performance from pre-test to after the preparatory period than TRAD [between-group change 6.0% (6.6%)]. The present findings suggest that HIT sessions should be incorporated during the transition phase to avoid reduction in fitness and performance level and thereby increase the likelihood of improved performance from the end of one season to the beginning of the subsequent season.

  6. Effects of Two Different Training Periodization Models on Physical and Physiological Aspects of Elite Female Team Handball Players.

    Science.gov (United States)

    Manchado, Carmen; Cortell-Tormo, Juan M; Tortosa-Martínez, Juan

    2018-01-01

    Manchado, C, Cortell-Tormo, JM, and Tortosa-Martínez, J. Effects of two different training periodization models on physical and physiological aspects of elite female team handball players. J Strength Cond Res 32(1): 280-287, 2018-The aim of this study was to compare training-induced changes in selected physiological and physical team handball performance factors after 2 training periodization models: traditional periodization (TP) vs. block periodization (BP). Eleven female team handball players who played over 2 consecutive seasons for a Spanish first league team were assessed twice per season during a training cycle. On each occasion, participants completed anthropometric, maximal strength, and lower-body power assessments. In addition, incremental tests to determine maximum oxygen uptake (V[Combining Dot Above]O2max), sprint- and sport-specific throwing velocity tests were performed. Block periodization group experienced significantly greater improvements than TP on squat jump (5.97%; p handball performance factors in high level female handball players.

  7. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  8. ET Worldwide: A Periodic Compendium of Environmental Education and Training Opportunities. No. 15.

    Science.gov (United States)

    United Nations Environment Programme, Nairobi (Kenya).

    This document represents an extensively revised and updated United Nations Environment Programme (UNEP) Directory for Environmental Training Worldwide. It presents a listing of environmental education and training (EE&T) opportunities around the world as well as information on financial assistance for environmental studies abroad. This version…

  9. The Feasibility of Generalized Acoustic Sensor Operator Training. Final Report for Period February 1974-February 1975.

    Science.gov (United States)

    Daniels, Richard W.; Alden, David G.

    The feasibility of generalized approaches to training military personnel in the use of different types of sonar/acoustic warfare systems was explored. The initial phase of the project consisted of the analysis of representative sonar and acoustic equipment to identify training areas and operator performance requirements that could be subjected to…

  10. A short period of high-intensity interval training improves skeletal muscle mitochondrial function and pulmonary oxygen uptake kinetics

    DEFF Research Database (Denmark)

    Christensen, Peter Møller; Jacobs, Robert A; Bonne, Thomas Christian

    2016-01-01

    The aim of the present study was to examine whether improvements in pulmonary V̇O2 kinetics following a short period of high-intensity training (HIT) would be associated with improved skeletal muscle mitochondrial function. Ten untrained male volunteers (age: 26 ± 2; mean ± SD) performed six HIT...

  11. Effects of Added Resistance Training on Physical Fitness, Body Composition, and Serum Hormone Concentrations During Eight Weeks of Special Military Training Period.

    Science.gov (United States)

    Vaara, Jani P; Kokko, Juha; Isoranta, Manne; Kyröläinen, Heikki

    2015-11-01

    A high volume of military training has been shown to compromise muscle strength development. We examined effects of added low-volume resistance training during special military training (ST) period, which took place after basic training period. Male conscripts (n = 25) were assigned to standardized ST with added resistance training group (TG, n = 13) and group with standardized ST only (control) (CG, n = 12). Standardized ST with added resistance training group performed 2 resistance training sessions per week for 8 weeks: hypertrophic strength (weeks 1-3), maximal strength (weeks 4-6) and power training (weeks 7-8). Maximal strength tests, load carriage performance (3.2 km, 27 kg), and hormone concentrations were measured before and after ST (mean ± SD). Both groups improved similarly in their load carriage performance time (TG: 1,162 ± 116 seconds vs. 1,047 ± 81 seconds; CG: 1,142 ± 95 seconds vs. 1,035 ± 81 seconds) (p < 0.001) but decreased maximal strength of the lower extremities (TG: 5,250 ± 1,110 N vs. 4,290 ± 720 N; CG: 5,170 ± 1,050 N vs. 4,330 ± 1,230 N) and back muscles (TG: 4,290 ± 990 N vs. 3,570 ± 48 N; CG: 3,920 ± 72 N vs. 3,410 ± 53 N) (p ≤ 0.05). Maximal strength of the upper extremities improved in CG (1,040 ± 200 N vs. 1,140 ± 200 N) (p ≤ 0.05) but not in TG. Maximal strength of the abdominal muscles improved in TG (3,260 ± 510 N vs. 3,740 ± 75 N) (p ≤ 0.05) but not in CG. Testosterone concentration increased in CG (15.2 ± 3.6 nmol·L⁻¹ vs. 21.6 ± 5.0 nmol·L⁻¹) (p < 0.01) but not in TG (18.6 ± 4.3 nmol·L⁻¹ vs. 19.5 ± 9.4 nmol·L⁻¹). In conclusion, interference with strength gains might be related to the high volume of aerobic activities and too low volume of resistance training during ST. To develop strength characteristics, careful periodization and individualization should be adopted in ST.

  12. Autogenic Training Relaxation Helping Postpartum Mothers to Achieve Successful Breastfeeding on Early Lactation Period

    OpenAIRE

    Juanita, Farida

    2013-01-01

    Introduction: The numbers of breastfeeding failures are mostly caused by mothers` disbelief to themselves. One method that can be done to overcome these problems in accordance with the self-care nursing theory is the autogenic training relaxation. This method teaches mothers to be self-sufficient in building a positive intention and motivation to help the process of breastfeeding. This study aimed to examine the influence of autogenic training relaxation to the effectiveness of breastfeeding ...

  13. Features of the training process of handball players of higher qualification between rounds in the competitive period

    Directory of Open Access Journals (Sweden)

    V.A. Tyshchenko

    2015-01-01

    Full Text Available Purpose : the technology of preparation of athletes in accordance with the requirements of the system approach. Team management methodology disclosed in terms of the training process in the competitive period between rounds of the regular championship of Ukraine. Material : the experiment involved 85 athletes aged 18-32 years. Results : The recommended during pilot training to perform technical and tactical actions in lockstep future games. Testing and modeling training - at a more complete simulation of conditions of competition. Shock training to perform with significant excess volume and intensity. Shock-modeling training - close to a match where the simulated conditions and confounding factor. The most efficient and effective indicators to consider: the number of substitutions in one match - 8-12 times; residence time player on the court - 12-15 minutes; preferred time of travel players during replacement - 3-5 minutes; heart rate after a rest - 100-120 beats per minute. Conclusions : The developed model microcycle training process handball players between rounds of the Championship of Ukraine.

  14. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  15. REPEATED SPRINT ABILITY AND RECOVERY PERIOD: COMPARISON OF TRAINED AND UNTRAINED INDIVIDUALS

    OpenAIRE

    Sultan

    2016-01-01

    The purpose of the study was to investigate the effects of training both in repeated sprint ability (RSA) and during the recovery after sprint. Soccer players playing in regional amateur league (n=14, age: 21.86±2.35 years, height: 180.14±4.54 cm, body mass: 72.57±5.03 kg, training age: 8.71±1.86 years) and students from faculty of sport sciences that played soccer in the past (n=13, age: 23.77±2.65 years, height: 178.54±4.67 cm, body mass: 74.54±10.52 kg) participated in this study as traine...

  16. AUTOGENIC TRAINING RELAXATION HELPING POSTPARTUM MOTHERS TO ACHIEVE SUCCESSFUL BREASTFEEDING ON EARLY LACTATION PERIOD

    Directory of Open Access Journals (Sweden)

    Farida Juanita

    2017-04-01

    Full Text Available Introduction: The numbers of breastfeeding failures are mostly caused by mothers` disbelief to themselves. One method that can be done to overcome these problems in accordance with the self-care nursing theory is the autogenic training relaxation. This method teaches mothers to be self-sufficient in building a positive intention and motivation to help the process of breastfeeding. This study aimed to examine the influence of autogenic training relaxation to the effectiveness of breastfeeding and the enhancement of breast milk volume on maternal postpartum. Method: By using an experimental posttest only-non equivalent control group design, 26 samples were taken based on the criteria and divided into two groups by matching technuiqe. autogenic training was given through MP3 Player for 3 weeks. Post-test observation conducted on the third week by home visit. Via Christi Breastfeeding Assessment Tool Jan Riordan modifications used to assess the effectiveness of breastfeeding, and to measure the milk ejection volume, used weighing test using electronic baby scales. Data were analyzed using one-tailed independent t test with α ≤ 0.05. Result: The analysis showed that mothers who did autogenic training relaxation could breastfeed more effectively and had greater average volume of milk ejection than the control group (p = 0.000 and p = 0.001. Discussion: It can be concluded that autogenic relaxation training techniques affect the effectiveness of breastfeeding and breast milk volume. These results can be considered that autogenic training as an intervention in program of support for breastfeeding mothers.

  17. Effects of active and passive training apparatus combined with rehabilitation training on lower limb function of stroke patients during recovery period

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    BACKGROUND: Stroke patients always spontaneously do some learning and training of motor functions;however, learning and training are not prompt and right, while patients do not have enough activity amounts.Active and passive motor training apparatus is aimed directly at lower limb training so as to stimulate nerve function through stimulating muscular movement. Based on motor mileage, motor time, various power supplies and velocity of active and passive training apparatus, we can understand the training condition and adjust training program.OBJECTIVE: To observe the effects of grade-III rehabilitation training combining with active and passive training apparatus on lower limb function, muscle strength and activity of daily living (ADL) in stroke patients during recovery period.DESIGN: Contrast observation.SETTING: Department of Rehabilitation, Jilin Academic Institute of Traditional Chinese Medicine.PARTICIPANTS: A total of 80 patients with stroke-induced hemiplegia after stabilizing vital signs for 2 weeks were selected from Department of Rehabilitation, Jilin Academic Institute of Traditional Chinese Medicine from January to June 2007. There were 47 males and 33 females, and their ages ranged from 41 to 75 years. All patients met the diagnostic criteria of the Fourth National Cerebrovascular Disease Academic Meeting in 1995 and were diagnosed as cerebral hemorrhage or cerebral infarction through CT or MRI examinations in clinic. Patients and their parents provided the confirmed consent. Based on therapeutic orders of hospitalization, patients were randomly divided into treatment group and control group with 40 patients in each group.METHODS: Patients in the control group received physical therapy and occupational therapy combining with rehabilitative treatment based on grade-Ⅲ rehabilitative treatment program, which was set by the National Cerebrovascular Disease Topic Group. In addition, patients in the treatment group were trained with active and passive

  18. Change in maximal fat oxidation in response to different regimes of periodized high-intensity interval training (HIIT).

    Science.gov (United States)

    Astorino, Todd A; Edmunds, Ross M; Clark, Amy; Gallant, Rachael; King, Leesa; Ordille, Gina M; Heath, Brendyn; Montell, Matthew; Bandong, Jason

    2017-04-01

    Increased capacity for fat oxidation (FatOx) is demonstrated in response to chronic endurance training as well as high-intensity interval training (HIIT). This study examined changes in maximal fat oxidation (MFO) in response to 20 sessions of periodized HIIT in an attempt to identify if various regimes of HIIT similarly augment capacity for FatOx. Thirty-nine habitually active men and women (mean age and VO 2 max = 22.5 ± 4.4 year and 40.0 ± 5.6 mL/kg/min) completed training and 32 men and women with similar physical activity and fitness level served as non-exercising controls (CON). Training consisted of ten sessions of progressive low-volume HIIT on the cycle ergometer after which participants completed an additional ten sessions of sprint interval training (SIT), high-volume HIIT, or periodized HIIT, whose assignment was randomized. Before and throughout training, MFO, FatOx, and carbohydrate oxidation (CHOOx) were assessed during progressive cycling to exhaustion. Compared to CON, there was no effect of HIIT on MFO (p = 0.11). Small increases (p = 0.03) in FatOx were evident in response to HIIT leading to an additional 4.3 g of fat oxidized, although this value may not be clinically meaningful. Our results refute the widely reported increases in capacity for FatOx demonstrated with HIIT, which is likely due to marked day-to-day variability in determinations of MFO and exercise fat oxidation as well as the heterogeneity of our sample.

  19. Effects of resistance training periodization on performance and salivary immune-endocrine responses of elite female basketball players.

    Science.gov (United States)

    Nunes, J A; Crewther, B T; Viveiros, L; De Rose, D; Aoki, M S

    2011-12-01

    The aim of this paper was to examine the effects of resistance training periodization on the performance and salivary hormone-immune responses of elite female basketball players. Twelve female athletes were monitored across a 50 day period of resistance training that emphasized strength, endurance and power. One repetition maximum (1RM) strength, maximal repetitions at 50% 1RM and vertical jump performance was assessed pre- and post-training. Saliva samples were also collected at 0700, 0930, 1100 and 1730 hours and analyzed for testosterone (T), cortisol (C) and immunoglobulin A (IgA). Improvements in 1RM strength, maximal repetitions and vertical jump performance were identified post-training (PTraining had no effect on salivary T and C concentrations, but the T:C ratio increased at 0730 hours (Ptraining) in strength and T concentrations were positively correlated at 0730 hours (Ptraining increased muscle performance in elite female basketball players, but only minor changes in the salivary T:C ratio and IgA were noted. Correlational analysis identified a possible role for early morning changes in T as a regulator of individual strength changes.

  20. Upper respiratory tract infection and mucosal immunity in young ice hockey players during the pre-tournament training period.

    Science.gov (United States)

    Orysiak, Joanna; Witek, Konrad; Malczewska-Lenczowska, Jadwiga; Zembron-Lacny, Agnieszka; Pokrywka, Andrzej; Sitkowski, Dariusz

    2018-02-27

    The aim of this study was to determine the effects of 17 days of training during preparation for the Ice Hockey Under 18 World Championship of the Polish ice hockey national team on the mucosal immune function and monitor upper respiratory tract infection (URTI) incidence before, during and after the competition. Twelve male ice hockey players (age 17.7±0.5 years) were recruited for this study. The first saliva/blood collection took place at the beginning of the training camp (without training at the training camp), the second one was conducted on the 9th day of the training camp immediately after the intensification of training, and the third collection was carried out on the 13th day of training (4 days before leaving for the World Championship) in the tapering phase. To assess the mucosal immune function, concentrations of secretory immunoglobulin A (sIgA), sIgA1, and sIgA2 were analyzed in saliva. Cortisol concentration and creatine kinase activity were determined in blood, as indicators of stress and muscle damage, respectively. The Wisconsin Upper Respiratory Symptom Survey-21 questionnaire was used to assess URTI symptoms. A significant increase in the sIgA1 and sIgA2 concentrations was observed in the third collection compared with the second time point (114.45±33.00 vs 77.49±27.29 and 88.97±25.33 vs 71.65±32.44 U, respectively). There were no statistically significant correlations between the URTI incidence and saliva variables. In conclusion, the tapering period positively affects the mucosal immune function, especially sIgA1 and sIgA2 concentrations, with no significant change in frequency of URTI in young ice hockey players.

  1. Working Memory and Reinforcement Schedule Jointly Determine Reinforcement Learning in Children: Potential Implications for Behavioral Parent Training

    Directory of Open Access Journals (Sweden)

    Elien Segers

    2018-03-01

    Full Text Available Introduction: Behavioral Parent Training (BPT is often provided for childhood psychiatric disorders. These disorders have been shown to be associated with working memory impairments. BPT is based on operant learning principles, yet how operant principles shape behavior (through the partial reinforcement (PRF extinction effect, i.e., greater resistance to extinction that is created when behavior is reinforced partially rather than continuously and the potential role of working memory therein is scarcely studied in children. This study explored the PRF extinction effect and the role of working memory therein using experimental tasks in typically developing children.Methods: Ninety-seven children (age 6–10 completed a working memory task and an operant learning task, in which children acquired a response-sequence rule under either continuous or PRF (120 trials, followed by an extinction phase (80 trials. Data of 88 children were used for analysis.Results: The PRF extinction effect was confirmed: We observed slower acquisition and extinction in the PRF condition as compared to the continuous reinforcement (CRF condition. Working memory was negatively related to acquisition but not extinction performance.Conclusion: Both reinforcement contingencies and working memory relate to acquisition performance. Potential implications for BPT are that decreasing working memory load may enhance the chance of optimally learning through reinforcement.

  2. [Different strength intermittent treadmill training of growth period rats and related bone metabolism of the hormone influence].

    Science.gov (United States)

    Xie, Shun-cheng; Ma, Xue-jun; Guo, Cheng-ji; Liu, Hong-zhen

    2012-05-01

    To explore the influence of different strength intermittent treadmill training of growth period rats on the bone metabolism, so as to provide the training intensity of teenagers to set theory support. Select 70 male four weeks Wistar rats according to body weight randomly divided into seven groups (n = 10): the control group and the exercise group. According to the VO2max the exercise group was divided into 6 groups: 65%, 70%, 75%, 80%, 85% and 90% group. Nine weeks treadmill training, training six days a week, each group of training three times, each time not less than 10min, the interval was 30 min. The last movement after 24 h, took the femur and blood to measured the bone mineral density (BMD), bone mass (BMC) and alkaline phosphatase (AKP), resist tartaric acid acidic phosphatase (Str-ACP). 1. The femoral BMD (0.1393 +/- 0.0031), BMC (0.4525 +/- 0.0335) of 70% group were significantly higher than those in the control group (BMD: 0.1200 +/- 0.0095, BMC: 0.3238 +/- 0.0485) and the other sports group (65% BMD:0.1339 +/- 0.0062, BMC: 0.4058 +/- 0.0492, 75% BMD: 0.1296 +/- 0.0015, BMC: 0.3869 +/- 0.0254, 80% BMD: 0.1223 +/- 0.0082, BMC: 0.3454 +/- 0.0483, 85% BMD: 0.1250 +/- 0.0044, BMC: 0.3731 +/- 0.0381, 90% BMD: 0.1171 +/- 0.0047, BMC: 0.3051 +/- 0.0286) (P growth period rat bone mass and bone mineral density to increase obviously.

  3. Effects of stress and corticosterone in two post-training periods, on spatial memory consolidation in adult male Wistar rats.

    Directory of Open Access Journals (Sweden)

    Jeimmy Marcela Cerón

    2015-04-01

    Full Text Available Memory consolidation is the process of gradual stabilization of long-term memory after learning (Alberini & Taubenfeld, 2008. This process involves the activation of intracellular signaling cascades that lead to the reorganization of synaptic proteins. Activation of these signaling pathways can regulate gene expression and protein synthesis (Brivanlou & Darnell, 2002. It is considered that the new proteins synthesized after learning are responsible for the changes in the neural architecture associated with memory consolidation (Mileusnic, 2004. In this sense, it has been shown that consolidation may be interrupted by inhibiting protein synthesis, leading to forgetfulness of the experience (Meeter & Murre, 2004. Although the dominant hypothesis is that memory consolidation requires a single molecular cascade, it has been suggested that multiple sets of synaptic modifications are required to reinforce changes after memory acquisition (Wittenber & Tsien, 2002. Consistently, recent studies have shown that protein synthesis associated with memory consolidation occurs in at least two post-training periods: immediately and 3-6 hours after training (Igaz et al., 2002; Bekinschtein et al., 2007. These memory consolidation periods share some molecular phenomena; however, each period is also associated with events that are different from the other (Igaz et al., 2002. To date, there is a substantial amount of evidence showing that stressful events may facilitate neuronal function and cognition. The term "stress" usually refers to a nonspecific response of the body to stimuli that threaten the physiological/psychological homeostasis (Selye, 1976; Chrousos et al., 1988. The stress response is associated with the activation of two physiological systems: the hypothalamic-pituitary-adrenal (HPA axis and the sympathetic adrenomedullary (SAM. Glucocorticoids (cortisol in humans and corticosterone in rodents are steroid hormones secreted by the adrenal glands as a

  4. Periodic self-rostering in shift work: correspondence between objective work hours, work hour preferences (personal fit), and work schedule satisfaction

    NARCIS (Netherlands)

    Ingre, M.; Äkerstedt, T.; Ekstedt, M.; Kecklund, L.G.

    2012-01-01

    Objectives The main objective of the present study was to investigate relative personal fit as the association between rated needs and preferences for work hours, on the one hand, and actual work hours, on the other hand, in three groups (hospital, call-center, and police) working with periodic

  5. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  6. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  7. Sistemas de tutoramento e épocas de transplante de physalis Periods replanting and training systems of cape-gooseberry

    Directory of Open Access Journals (Sweden)

    Cláudia Simone Madruga Lima

    2010-12-01

    Full Text Available A physalis (Physalis peruviana é uma pequena fruta com grandes potencialidades, que, associadas ao seu ciclo curto e às propriedades nutracêuticas, apresenta possibilidade de alto retorno econômico. O objetivo deste trabalho foi avaliar o sistema de tutoramento e a época de transplante mais adequados para o crescimento e a produção de frutos de P. peruviana nas condições edafoclimáticas do sul do Rio Grande do Sul. O trabalho foi desenvolvido em Pelotas, RS, na safra de 2007/2008. O transplante de mudas de physalis foi realizado em duas épocas (época 1, 21/11/2007 e época 2 15/01/2008, sendo as plantas tutoradas em quatro sistemas de condução (sistema "V" invertido, sistema triangular, sistema vertical com bambu e sistema vertical com fitilho, semelhantes aos utilizados na cultura do tomateiro. O delineamento experimental adotado foi de blocos casualizados, com três repetições, sendo cada um representado por dez plantas. Os tratamentos formaram um fatorial 2x4 (épocas de transplante x sistemas de tutoramento. As variáveis analisadas foram: incremento do comprimento e da área da seção do ramo principal, área da seção do ramo principal, produtividade e eficiência produtiva. Foi evidenciado que a primeira época de transplante associada aos sistemas de tutoramento "V" invertido e triangular proporciona melhor desempenho agronômico das plantas de physalis.The cape-gooseberry (Physalis peruviana is a small fruit with great potentialities that whether associated to its short cycle and nutraceutical properties it shows high economical return. The work aimed to evaluate the best training system and replant period to plant growth, production and fruit quality of P. peruviana under edaphoclimatic at conditions of southern Rio Grande do Sul. The trial was carried out in Pelotas, RS, in 2007/2008 crop. Transplanting seedlings cape-gooseberry was conducted in two seasons Plant replanting was done in two periods (period 1, 21

  8. Treadmill training with partial body weight support compared with conventional gait training for low-functioning children and adolescents with nonspastic cerebral palsy: a two-period crossover study.

    Science.gov (United States)

    Su, Ivan Y W; Chung, Kenny K Y; Chow, Daniel H K

    2013-12-01

    Partial body weight-supported treadmill training has been shown to be effective in gait training for patients with neurological disorders such as spinal cord injuries and stroke. Recent applications on children with cerebral palsy were reported, mostly on spastic cerebral palsy with single subject design. There is lack of evidence on the effectiveness of such training for nonspastic cerebral palsy, particularly those who are low functioning with limited intellectual capacity. This study evaluated the effectiveness of partial body weight-supported treadmill training for improving gross motor skills among these clients. A two-period randomized crossover design with repeated measures. A crossover design following an A-B versus a B-A pattern was adopted. The two training periods consisted of 12-week partial body weight-supported treadmill training (Training A) and 12-week conventional gait training (Training B) with a 10-week washout in between. Ten school-age participants with nonspastic cerebral palsy and severe mental retardation were recruited. The Gross Motor Function Measure-66 was administered immediately before and after each training period. Significant improvements in dimensions D and E of the Gross Motor Function Measure-66 and the Gross Motor Ability Estimator were obtained. Our findings revealed that the partial body weight-supported treadmill training was effective in improving gross motor skills for low-functioning children and adolescents with nonspastic cerebral palsy. .

  9. Improvement of the training process of qualified female athletes engaged in bodybuilding in the general preparatory stage of the preparatory period, taking into account the biological cycle

    Directory of Open Access Journals (Sweden)

    Viacheslav Mulyk

    2017-06-01

    Full Text Available Purpose: substantiation of the methodology of the training process of qualified female athletes engaged in bodybuilding in the general preparatory stage of the preparatory period, taking into account the biological cycle. Material & Methods: in the study participated 18 qualified female athletes engaged in bodybuilding, included in the Kharkov region team of bodybuilding. Results: comparative characteristic of the most frequently used methodology of the training process in bodybuilding are shows. An optimal methodology for qualified female athletes engaged in bodybuilding has been developed and justified, depending on the initial form of the athlete at the beginning of the general preparatory stage of the training. The dependence of the change in the body weight of female athletes from the training process is shows. Conclusion: on the basis of the study, the author suggests an optimal training methodology depending on the mesocycle of training in the preparatory period in the general preparatory stage.

  10. Effects of U.S. Navy Diver Training on Physiological Parameters, Time of Useful Consciousness and Cognitive Performance During Periods of Normobaric Hypoxia

    Science.gov (United States)

    2014-04-01

    TRAINING ON PHYSIOLOGICAL PARAMETERS, TIME OF USEFULL CONSCIOUSNESS, AND COGNITIVE PERFORMANCE DURING PERIODS OF NORMOBARIC HYPOXIA...Sato, Y. Watanabe, "Time of Usefull Consciousness Determination in Aircrew Members with Rerference to Prior Altitude Chamber Experience and Age

  11. A study of the distribution of color Doppler flows in the superficial digital flexor tendon of young Thoroughbreds during their training periods.

    Science.gov (United States)

    Hatazoe, Takashi; Endo, Yoshiro; Iwamoto, Yohei; Korosue, Kenji; Kuroda, Taisuke; Inoue, Saemi; Murata, Daiki; Hobo, Seiji; Misumi, Kazuhiro

    2015-01-01

    Aim of this study was to evaluate the relationships of exercise and tendon injury with Doppler flows appearing in the superficial digital flexor tendon (SDFT) of young Thoroughbreds during training periods. The forelimb SDFTs of 24 one- to two-year-old Thoroughbreds clinically free of any orthopaedic disorders were evaluated using grey-scale (GS) and color Doppler (CD) images during two training periods between December 2013 to April 2015. Twelve horses per year were examined in December, February, and April in training periods that began in September and ended in April. The SDFT was evaluated in 3 longitudinal images of equal lengths (labelled 1, 2, 3 in order from proximal to distal), and 6 transversal images separated by equal lengths (labelled 1A, 1B, 2A, 2B, 3A and 3B in order from proximal to distal) of the metacarpus using both GS and CD. The running (canter and gallop) distance for 1 month before the date of the ultrasonographic examinations was increased in December, February, and April in both of the two training periods. CD flows defined as rhythmically blinking or pulsatory colored signals were found in 56 of 864 (6.4%) transversal CD images, in 28, 12, 13, and 3 images of 1A, 1B, 2A and 2B, respectively, and in 7, 14, and 35 images captured in December, February, and April, respectively. There were no longitudinal or transversal GS images indicating injury in the SDFTs in either of the two training periods. The increase of CD flows in the proximal regions of the SDFT are possibly related to the increase of the running distance during the training periods of the one- to two-year-old Thoroughbreds. Because no injury was diagnosed in the SDFTs by GS images during the training periods, the increase of CD flows in the proximal parts of SDFT is not necessarily predictive of tendon injury in the near future during the training period of young Thoroughbreds.

  12. Effect of periodized high intensity interval training (HIIT) on body composition and attitudes towards hunger in active men and women.

    Science.gov (United States)

    Astorino, Todd A; Heath, Brendyn; Bandong, Jason; Ordille, Gina M; Contreras, Ramon; Montell, Matthew; Schubert, Matthew M

    2018-01-01

    High intensity interval training (HIIT) increases maximal oxygen uptake similar to aerobic exercise. However, changes in body composition are equivocal in response to HIIT. We examined changes in body composition and dietary restraint in response to 20 sessions of HIIT varying in structure. Thirty nine active men and women (age and VO2max=22.5±4.4 years and 40.1±5.6 mL/kg/min) were randomized to one of three periodized HIIT regimes performed on a cycle ergometer. Before and after training, body composition was assessed using skinfolds (SKF), circumference measures, and Bioelectrical Impedance Analysis (BIA) following standardized procedures. Hunger, restraint, and disinhibition were also measured using the 3-Factor Eating Questionnaire and Power of Food Survey. Control participants (N.=32, age and VO2max=25.6±4.4 years and 40.6±4.9 mL/kg/min) matched for age and fitness level underwent all testing but did not complete HIIT. There was no change (P>0.05) in body mass, circumferences, or BIA-derived body fat in response to HIIT. However, SKF-derived body fat declined (P=0.04) with HIIT, and gender x time (P=0.03) and gender x time x regimen interactions (P=0.04) were shown in that women but not men exhibited significant reductions in body fat. Hunger was reduced from baseline to post-training (P=0.028), but this response was not different in response to HIIT compared to controls. Twenty sessions of low-volume HIIT reduce body fat in women but not men, but do not alter perceptions of hunger.

  13. Study on reactor power transient characteristics (reactor training experiments). Control rod reactivity calibration by positive period method and other experiment

    International Nuclear Information System (INIS)

    Ozaki, Yoshihiko; Sunagawa, Takeyoshi

    2014-01-01

    In this paper, it is reported about some experiments that have been carried out in the reactor training that targets sophomore of the department of applied nuclear engineering, FUT. Reactor of Kinki University Atomic Energy Research Institute (UTR-KINKI) was used for reactor training. When each critical state was achieved at different reactor output respectively in reactor operating, it was confirmed that the control rod position at that time does not change. Further, control rod reactivity calibration experiments using positive Period method were carried out for shim safety rod and regulating rod, respectively. The results were obtained as reasonable values in comparison with the nominal value of the UTR-KINKI. The measurement of reactor power change after reactor scram was performed, and the presence of the delayed neutron precursor was confirmed by calculating the half-life. The spatial dose rate measurement experiment of neutrons and γ-rays in the reactor room in a reactor power 1W operating conditions were also performed. (author)

  14. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  15. Computational Approaches for Analyzing Tradeoffs between Training and Aiding. Final Technical Paper for Period February-December 1989.

    Science.gov (United States)

    Rouse, William B.; Johnson, William B.

    A methodological framework is presented for representing tradeoffs among alternative combinations of training and aiding for personnel in complex situations. In general, more highly trained people need less aid, and those with less training need more aid. Balancing training and aiding to accomplish the objectives of the system in a cost effective…

  16. THE EFFECTS OF INCOME, GENDER, AGE, EDUCATION, WORKING PERIOD, INSURANCE, TRAINING, AND WORKER STATUS ON OUTSOURCED AND WORKERS PERFORMANCE IN SOUTH SUMATERA IN MANUFACTURING COMPANIES

    Directory of Open Access Journals (Sweden)

    Ratna Juwita

    2017-06-01

    Full Text Available This research investigated the effects of income, gender, age, education, working period, insurance, training and workers’ status (outsourcing or permanent on performance. The result showed that gender, education, insurance, training and status had positive and significant effect on performace. Income had significant and negative effect on performance, the increased income would decrease performance. Age had positive but not significant effect, the increased age would decrease performance. Working period had negative but not significsnt effect on performance, the short working period would decrease performance.

  17. Effect of A 16 Week Combined Strength and Plyometric Training Program Followed by A Detraining Period on Athletic Performance in Pubertal Volleyball Players.

    Science.gov (United States)

    Fathi, Abed; Hammami, Raouf; Moran, Jason; Borji, Rihab; Sahli, Sonia; Rebai, Haithem

    2018-02-01

    The purpose of this study was to determine the effects of 16 weeks of combined strength and plyometric training or plyometric training alone, and how a detraining program can modify adaptations in response to the training stimulus. Sixty male volleyball players (circa PHV:-1 to +1 years from PHV) were assigned to a Combined Training group (CTG) (n=20), a Plyometric Training group (PTG) (n=20) or a control group (CG) (n=20). The experimental groups (CTG and PTG) participated in training twice weekly for 16 weeks. Thigh muscle volume, body fat, flexibility, sprint, jump height and medicine ball throw were measured at pre-training, post-training and detraining. Respectively, the CTG and PTG showed increases in thigh muscle volume (Effect size: 0.71 and 0.42), and decreases in body fat (-0.42 and -0.34) as well as improvements in 5 m sprint (-0.69 and -0.46) 10 m sprint (-0.31 and -0.3), lower body muscle power (0.44 and 0.36) and upper body muscle power (1.32 and 0.7). After the detraining period, all groups maintained previously attained muscle power (6.79% to 9.87%; pplyometric training provided better improvements than plyometric training only. The combination of strength and plyometric training is a time-effective training modality that confers improvements in physical performance measures, muscle size and body fat. A temporary period of detraining may not undermine performance gains in pubertal volleyball players.

  18. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  19. The Effect of One Period Factitious and True Neurofeedback Training on the Balance Performance of Active Males

    Directory of Open Access Journals (Sweden)

    Amir Hossein Barati

    2015-12-01

    Conclusion: Due to its positive impact on the balance of active males, neurofeedback training can be used as a complementary training program to increase their efficiency of such students in competitions.

  20. 'On line' course for the periodical training in radiological safety of the workers of a radioactive facility

    International Nuclear Information System (INIS)

    Amador B, Z.H.; Ayra P, F.E.; Torres B, M.B.

    2006-01-01

    The results of an 'on line' course for the periodical training in radiological safety of the workers of a radioactive installation are presented. The course is developed for own specialists. The following topics are approached: the state of the art of the studies on the biological effects of the ionizing radiations, the new national regulations, the analysis of the behavior of the occupational exposure, of the obtained experiences of the radiological events, of the results of the radiological surveillance of the work positions, of the detected violations and of the behavior of the outstanding systems and the optimization. The study of the acquired experiences in the packing and the transportation of radioactive materials and the administration of the radioactive waste are included. The study of the course by one month is organized and then two convocations of theoretical exams are executed and one for the evaluation practices of the instructions and procedures. To evaluate the effectiveness of the course a survey it is applied and the later behavior of indicators of the radiological safety of the plant is analyzed. The results that are obtained show a positive balance. (Author)

  1. THE EFFECTS OF INCOME, GENDER, AGE, EDUCATION, WORKING PERIOD, INSURANCE, TRAINING, AND WORKER STATUS ON OUTSOURCED AND WORKERS PERFORMANCE IN SOUTH SUMATERA IN MANUFACTURING COMPANIES

    OpenAIRE

    Ratna Juwita; Nurlina Tarmizi; Didik Susetyo; Bambang Bemby Soebyakto

    2017-01-01

    This research investigated the effects of income, gender, age, education, working period, insurance, training and workers’ status (outsourcing or permanent) on performance. The result showed that gender, education, insurance, training and status had positive and significant effect on performace. Income had significant and negative effect on performance, the increased income would decrease performance. Age had positive but not significant effect, the increased age would decrease...

  2. Controlled Manipulation with a Bose–Einstein Condensates N-Soliton Train under the Influence of Harmonic and Tilted Periodic Potentials

    International Nuclear Information System (INIS)

    Feng-De, Zong; Jie-Fang, Zhang

    2008-01-01

    A model of the perturbed complex Toda chain (PCTC) to describe the dynamics of a Bose–Einstein condensate (BEC) N-soliton train trapped in an applied combined external potential consisting of both a weak harmonic and tilted periodic component is first developed. Using the developed theory, the BEC N-soliton train dynamics is shown to be well approximated by 4N coupled nonlinear differential equations, which describe the fundamental interactions in the system arising from the interplay of amplitude, velocity, centre-of-mass position, and phase. The simplified analytic theory allows for an efficient and convenient method for characterizing the BEC N-soliton train behaviour. It further gives the critical values of the strength of the potential for which one or more localized states can be extracted from a soliton train and demonstrates that the BEC N-soliton train can move selectively from one lattice site to another by simply manipulating the strength of the potential. (general)

  3. Efficiency of the technique of the training process of highly skilled bodybuilders of the mesomorphic type of constitution in the competitive period

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskіy

    2016-10-01

    Full Text Available Purpose: foundation of efficiency of the technique of the training process of highly skilled bodybuilders in the competitive period. Material & Methods: 16 highly skilled bodybuilders of 22–30 years old participated in the research, the average body weight of sportsmen makes 872 – 1022 kg, which are included in the structure of the national team of Ukraine on bodybuilding. Methods: method of the theoretical analysis and generalization of literature, pedagogical observation, pedagogical experiment, method of mathematical statistics. Results: the comparative characteristic of the most often used techniques of the training process in bodybuilding is provided. The effective technique for highly skilled bodybuilders of the mesomorphic type of constitution, depending on the initial uniform of a sportsman at the beginning of the competitive period of training is developed and proved. Dependence of change of body weight of a bodybuilder on the training process is directed. Conclusions: on the effective training method, depending on microcycle of trainings in the competitive period precompetitive and competitive mesocycles (selection and main competitions, is offered the basis of the conducted research.

  4. Effects of Pre - Season Short - Term Daily Undulating Periodized Training on Muscle Strength and Sprint Performance of Under - 20 Soccer Players

    Directory of Open Access Journals (Sweden)

    Charles Ricardo L OPES

    2015-06-01

    Full Text Available The aim of this study was to evaluate the effects of daily undulating training periodization designed for maximal lower limb muscle strength and sprint performance in under - 20 soccer players. Twenty - four male athletes (age = 19.1 ± 1.2 yr; mass = 71.1 ± 6. 8 kg; height = 178.0 ± 0.1 cm participated in four weeks of a daily undulating periodized (DUP training soccer program. During the pre - and post - training periods the subjects performed a one repetition maximum (1 RM half back squat test and a 15 - meter s print. Significant training - induced changes were observed in sprint times (pre = 2.38 ± 0.01 s; post = 2.31 ± 0.02 s and 1 RM tests (pre = 107.0 ± 2.0 kg; post = 128.0 ± 2.2 kg. These results indicate that a DUP program is efficient in promoting positive neuromuscular adaptations in soccer players, even with a short - term preseason training period.

  5. Medicare Program; Merit-Based Incentive Payment System (MIPS) and Alternative Payment Model (APM) Incentive Under the Physician Fee Schedule, and Criteria for Physician-Focused Payment Models. Final rule with comment period.

    Science.gov (United States)

    2016-11-04

    The Medicare Access and CHIP Reauthorization Act of 2015 (MACRA) repeals the Medicare sustainable growth rate (SGR) methodology for updates to the physician fee schedule (PFS) and replaces it with a new approach to payment called the Quality Payment Program that rewards the delivery of high-quality patient care through two avenues: Advanced Alternative Payment Models (Advanced APMs) and the Merit-based Incentive Payment System (MIPS) for eligible clinicians or groups under the PFS. This final rule with comment period establishes incentives for participation in certain alternative payment models (APMs) and includes the criteria for use by the Physician-Focused Payment Model Technical Advisory Committee (PTAC) in making comments and recommendations on physician-focused payment models (PFPMs). Alternative Payment Models are payment approaches, developed in partnership with the clinician community, that provide added incentives to deliver high-quality and cost-efficient care. APMs can apply to a specific clinical condition, a care episode, or a population. This final rule with comment period also establishes the MIPS, a new program for certain Medicare-enrolled practitioners. MIPS will consolidate components of three existing programs, the Physician Quality Reporting System (PQRS), the Physician Value-based Payment Modifier (VM), and the Medicare Electronic Health Record (EHR) Incentive Program for Eligible Professionals (EPs), and will continue the focus on quality, cost, and use of certified EHR technology (CEHRT) in a cohesive program that avoids redundancies. In this final rule with comment period we have rebranded key terminology based on feedback from stakeholders, with the goal of selecting terms that will be more easily identified and understood by our stakeholders.

  6. Training Load, Physical Performance, Biochemical Markers, and Psychological Stress During A Short Preparatory Period in Brazilian Elite Male Volleyball Players.

    Science.gov (United States)

    Horta, Thiago A G; Bara Filho, Maurício G; Coimbra, Danilo R; Miranda, R; Werneck, Francisco Z

    2017-12-11

    The aim of this study was to assess the relationship between training load (TL) and physical performance, biochemical markers, and psychological stress during a short preparatory period (PP) in Brazilian elite male volleyball players. Twelve volleyball players from a team competing in the Brazilian Men's Volleyball Super League were enrolled (26.9 ± 4.6 years). Countermovement Jump (CMJ), Creatine Kinase (CK), Testosterone (T), Cortisol (Cr), T/Cr ratio, and Recovery and Stress Questionnaire for Athletes (RESTQ-Sport) were collected at baseline, after 2, 4, and 6 week. TL was quantified daily using the Rating of Perceived Exertion (RPE). Differences were noted between Total Weekly TL (TWTL) (F3,33 = 50.907; p = 0.0001), CK (F3,33 = 16.157; p = 0.0001), and T (F3,33 = 3.283; p = 0.03). No differences were seen in CMJ (F3,33 = 1.821; p = 0.16), Cr (F3,33 = 2.409; p = 0.08), or T/Cr ratio (F3,33 = 1.527; p = 0.23). The RESTQ-Sport demonstrated differences between moments in Social Stress (F3,33 = 2.297; p = 0.04; Eta = 0.25), Success (F3,33 = 4.350; p = 0.01; Eta = 0.19), General Well-being (F3,33 = 4.465; p = 0.01; Eta = 0.36), and Injury (F3,33 = 2.792; p = 0.05; Eta = 0.62). The results showed a significant correlations of small to moderate magnitude between TWTL and CK (r = 0.32; p = 0.05). In conclusion, a short PP in volleyball leads to increased TL, CK level, and psychological stress. TL was related with the increase of CK, suggesting muscle damage without increased of physical performance.

  7. Contributions of Platform Motion to Simulator Training Effectiveness: Study II--Aerobatics. Interim Report for Period March 1976-November 1977.

    Science.gov (United States)

    Martin, Elizabeth L.; Waag, Wayne L.

    A transfer-of-training design was used to evaluate the contributions of simulator training with synergistic six-degrees-of-freedom platform motion to aerobatic skills acquisition in the novice pilot. Thirty-six undergraduate pilot trainees were randomly assigned to one of three treatment groups: motion, no-motion, and control. Those in the control…

  8. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  9. The effects of d-aspartic acid supplementation in resistance-trained men over a three month training period: A randomised controlled trial.

    Directory of Open Access Journals (Sweden)

    Geoffrey W Melville

    Full Text Available Research on d-aspartic acid (DAA has demonstrated increases in total testosterone levels in untrained men, however research in resistance-trained men demonstrated no changes, and reductions in testosterone levels. The long-term consequences of DAA in a resistance trained population are currently unknown.To evaluate the effectiveness of DAA to alter basal testosterone levels over 3 months of resistance training in resistance-trained men.Randomised, double-blind, placebo controlled trial in healthy resistance-trained men, aged 18-36, had been performing regular resistance training exercise for at least 3 d.w-1 for the previous 2 years. Randomised participants were 22 men (d-aspartic acid n = 11; placebo n = 11 (age, 23.8±4.9 y, training age, 3.2±1.5 y.D-aspartic acid (6 g.d-1, DAA versus equal-weight, visually-matched placebo (PLA. All participants performed 12 weeks of supervised, periodised resistance training (4 d.w-1, with a program focusing on all muscle groups.Basal hormones, total testosterone (TT, free testosterone (FT, estradiol (E2, sex-hormone-binding globulin (SHBG and albumin (ALB; isometric strength; calf muscle cross-sectional area (CSA; calf muscle thickness; quadriceps muscle CSA; quadriceps muscle thickness; evoked V-wave and H-reflexes, were assessed at weeks zero (T1, after six weeks (T2 and after 12 weeks (T3.No change in basal TT or FT were observed after the intervention. DAA supplementation (n = 10 led to a 16%, 95% CI [-27%, -5%] reduction in E2 from T1-T3 (p<0.01. The placebo group (n = 9 demonstrated improvements in spinal responsiveness (gastrocnemius at the level of the alpha motoneuron. Both groups exhibited increases in isometric strength of the plantar flexors by 17%, 95% CI [7%, 28%] (p<0.05 as well as similar increases in hypertrophy in the quadriceps and calf muscles.The results of this paper indicate that DAA supplementation is ineffective at changing testosterone levels, or positively affecting training

  10. The effects of d-aspartic acid supplementation in resistance-trained men over a three month training period: A randomised controlled trial.

    Science.gov (United States)

    Melville, Geoffrey W; Siegler, Jason C; Marshall, Paul W M

    2017-01-01

    Research on d-aspartic acid (DAA) has demonstrated increases in total testosterone levels in untrained men, however research in resistance-trained men demonstrated no changes, and reductions in testosterone levels. The long-term consequences of DAA in a resistance trained population are currently unknown. To evaluate the effectiveness of DAA to alter basal testosterone levels over 3 months of resistance training in resistance-trained men. Randomised, double-blind, placebo controlled trial in healthy resistance-trained men, aged 18-36, had been performing regular resistance training exercise for at least 3 d.w-1 for the previous 2 years. Randomised participants were 22 men (d-aspartic acid n = 11; placebo n = 11) (age, 23.8±4.9 y, training age, 3.2±1.5 y). D-aspartic acid (6 g.d-1, DAA) versus equal-weight, visually-matched placebo (PLA). All participants performed 12 weeks of supervised, periodised resistance training (4 d.w-1), with a program focusing on all muscle groups. Basal hormones, total testosterone (TT), free testosterone (FT), estradiol (E2), sex-hormone-binding globulin (SHBG) and albumin (ALB); isometric strength; calf muscle cross-sectional area (CSA); calf muscle thickness; quadriceps muscle CSA; quadriceps muscle thickness; evoked V-wave and H-reflexes, were assessed at weeks zero (T1), after six weeks (T2) and after 12 weeks (T3). No change in basal TT or FT were observed after the intervention. DAA supplementation (n = 10) led to a 16%, 95% CI [-27%, -5%] reduction in E2 from T1-T3 (p<0.01). The placebo group (n = 9) demonstrated improvements in spinal responsiveness (gastrocnemius) at the level of the alpha motoneuron. Both groups exhibited increases in isometric strength of the plantar flexors by 17%, 95% CI [7%, 28%] (p<0.05) as well as similar increases in hypertrophy in the quadriceps and calf muscles. The results of this paper indicate that DAA supplementation is ineffective at changing testosterone levels, or positively affecting training

  11. Comment Period for Proposed Remedy Selection Plan for Multiple Training Areas located at Joint Base Cape Cod

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) is seeking public comment on the EPA’s proposal indicating no further action is needed for multiple Training Areas on the Camp Edwards portion of Joint Base Cape Cod (JBCC).

  12. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  13. The Mucosal Immune Function Is Not Compromised during a Period of High-Intensity Interval Training. Is It Time to Reconsider an Old Assumption?

    Science.gov (United States)

    Born, Dennis-Peter; Zinner, Christoph; Sperlich, Billy

    2017-01-01

    Purpose: The aim of the study was to evaluate the mucosal immune function and circadian variation of salivary cortisol, Immunoglobin-A (sIgA) secretion rate and mood during a period of high-intensity interval training (HIIT) compared to long-slow distance training (LSD). Methods: Recreational male runners (n = 28) completed nine sessions of either HIIT or LSD within 3 weeks. The HIIT involved 4 × 4 min of running at 90–95% of maximum heart rate interspersed with 3 min of active recovery while the LSD comprised of continuous running at 70–75% of maximum heart rate for 60–80 min. The psycho-immunological stress-response was investigated with a full daily profile of salivary cortisol and immunoglobin-A (sIgA) secretion rate along with the mood state on a baseline day, the first and last day of training and at follow-up 4 days after the last day of training. Before and after the training period, each athlete's running performance and peak oxygen uptake (V·O2peak) was determined with an incremental exercise test. Results: The HIIT resulted in a longer time-to-exhaustion (P = 0.02) and increased V·O2peak compared to LSD (P = 0.01). The circadian variation of sIgA secretion rate showed highest values in the morning immediately after waking up followed by a decrease throughout the day in both groups (P HIIT, the wake-up response of sIgA secretion rate was higher on the last day of training (P HIIT and LSD (P HIIT indicates no compromised mucosal immune function compared to LSD and shows the functional adaptation of the mucosal immune system in response to the increased stress and training load of nine sessions of HIIT. PMID:28744226

  14. Medical-pedagogical supervisions for sportsmen short-trek in a period of еducational and trainings employments

    Directory of Open Access Journals (Sweden)

    Zaycev V.P.

    2010-04-01

    Full Text Available The results of inspection of sportsmen are generalized. 8 highly skilled sportsmen were inspected. A method is presented medical-pedagogical supervisions. Age of sportsmen: 16-18 years - 2 sportsmen, 19-20 years - 3 sportsmen, 22-25 years - 3 sportsmen. The results of the use of clinical inspection and visual supervisions are rotined. Frequency of heart-throbs and arteriotony is certain. Information of pulsator is resulted, functional tests and tests, dynamometer. For renewal of organism after educational and training employment employment it is recommended to accept water procedures, vitaminized food, autogenic training, active and passive rest.

  15. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  16. A Forecast of Army Aviation Training Research and Development Requirements for the Period 1985 to 2000. Volume 1

    Science.gov (United States)

    1981-08-01

    cinematic simulation, and interactive computer- 97 control display devices have been reviewed by Roscoe. [35] Developments on some of these training...R. S., Study and Analysis of Requirements for Head-Up Display (HUD), NASA CR-6612, March 1970. 6. Burnette, K. T., "The Status of Human Perceptual

  17. The effect of an aerobic training period on mental health and depression in Iranian women with polycystic ovary syndrome

    Directory of Open Access Journals (Sweden)

    Saremi A*

    2016-06-01

    Full Text Available Introduction: Polycystic Ovary Syndrome (PCOS is among the common endocrine women disorders that can create manifestations such as anxiety and depression. In this study, the effect of aerobic training on mental health and depression among Iranian women suffering from PCOS has been examined. Methods: This semi experimental study was carried out based on pre-test and post-test on experiment and control groups in Arak, Iran. Twenty-two women with polycystic ovary syndrome (aged 27.82 ±5.23 yr were selected and randomly divided to training (n=12 and control (n=10 groups. Aerobic training program was performed 25-40 min/d, 3d/wk, for 10 weeks. Mental health and depression were evaluated using a general health questionnaire-28 (GHQ-28 and a Beck depression inventory (BAI-II in the two groups before and after the study. Results: The 10 week aerobic training had a significant effect on mental health, subscales of physical symptoms, anxiety and depression (p0.05. Conclusion: The result of present study suggests that aerobic exercise can improve the mental disorders in women with polycystic ovary syndrome.

  18. Establishing contract periods

    International Nuclear Information System (INIS)

    Huffman, F.C.

    1978-01-01

    The lead time for executing the Adjustable Fixed-Commitment (AFC) contract and exceptions which may be considered are discussed. The initial delivery period is also discussed. Delays, deferrals, and schedule adjustment charges are finally considered

  19. Effect of 4 Weeks of Detraining After a Period of Resistance Training on Plasma Apelin Levels in Overweight and Obese Girls

    Directory of Open Access Journals (Sweden)

    Rezvaneh Galdavi

    2017-02-01

    Full Text Available Background and Objectives: Apelin is secreted from visceral adipose tissue. However, the effect of resistance training and consequent detraining on the apelin level in obesity, has not yet been clearly determined. In the current research, the effect of 4 weeks of detraining after a period of resistance training, was investigated on the plasma apelin levels in overweight and obese girls. Methods: In this quasi-experimental study, 22 overweight and obese girls were purposefully selected and randomly divided into two groups of experimental (n=12 and control (n=10. The experimental group exercised in an 8-week training program (4 sessions per week according to a training program with an intensity of 65-80% of one maximum repetition, and then experienced 4 weeks of detraining. Blood sampling was performed after a 12-h fasting in various phases and the level of apelin was measured. Data were analyzed by Kolmogorov-Smirnov, repeated measure ANOVA, post-hoc LSD, and independent t-tests at a significance level of α 0.05. Also, after 4 weeks of detraining a slight increase was seen in the levels of apelin, but was not significant (p>0.05. Conclusion: According to the results of this study, resistance training as a new non-drug therapy can be effective in reducing the levels of apelin. Also, apelin levels increases with discontinuation of exercise, which may lead to the emergence of inflammatory features in the cardiovascular system.

  20. Study of junior weight lifters’ special fitness with different methods of speed-power training in preparatory period of general preparatory stage

    Directory of Open Access Journals (Sweden)

    O. B. Piven

    2015-09-01

    Full Text Available Purpose: studying of junior weight lifters’ special fitness in preparatory period of general preparatory stage. Material: 30 junior weight lifters of 12 - 14 years’ old age were involved in experiment (2 nd and 3 rd sport grades. Results: optimal indicators of training by shock method have been determined for sportsmen of experimental group. Scope of loads was: squats with barbell on shoulders - lifting 779 times (90 tons; 310 jumps in depth and jumps out. Power indicators in total of combined exercises have increased by 16.5 kg. In control group other methodic was used. In control group scope of loads was: lifting of barbell - 910 times (111 tons. Power indicators in total of combined exercises have increased by 7.2 kg. Conclusions: the following regiment of training is recommended: first 3 weeks - jumps. Dozing and load scopes shall be as follows: first two trainings - two attempts (10 times each with height of 0.5 m; third training - 3 attempts (10 times each with height of 0.5 m; forth training - 4 attempts (10 times each with height of 0.7 m. Jumps in depth shall be used 3 times weekly.

  1. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  2. DAC to Mitigate the Effect of Periodic Disturbances on Drive Train using Collective Pitch for Variable Speed Wind Turbine

    DEFF Research Database (Denmark)

    Imran, Raja Muhammad; Hussain, Dil Muhammad Akbar; Soltani, Mohsen

    2015-01-01

    scheme to mitigate the effect of 3p flicker on drive train. 5MW wind turbine of the National Renewable Laboratories (NREL) is used as research object and results are simulated in MATLAB/Simulink. We designed the controller based on linearized model of the wind turbine generated for above rated wind speed...... and then tested its performance on the nonlinear model of wind turbine. We have shown a comparison of the results for proportional-integral(PI) and proposed DAC controller tested on nonlinear model of wind turbine. Result shows that our proposed controller shows better mitigation of flicker generated due to 3p......DAC is a linear control technique used to mitigate the effect of disturbance on the plant. It is a superposition of full state feedback and disturbance feedback. This paper presents a control technique based on Disturbance Accommodation Control (DAC) to reduce fatigue on drive train generated...

  3. Workforce scheduling: A new model incorporating human factors

    Directory of Open Access Journals (Sweden)

    Mohammed Othman

    2012-12-01

    Full Text Available Purpose: The majority of a company’s improvement comes when the right workers with the right skills, behaviors and capacities are deployed appropriately throughout a company. This paper considers a workforce scheduling model including human aspects such as skills, training, workers’ personalities, workers’ breaks and workers’ fatigue and recovery levels. This model helps to minimize the hiring, firing, training and overtime costs, minimize the number of fired workers with high performance, minimize the break time and minimize the average worker’s fatigue level.Design/methodology/approach: To achieve this objective, a multi objective mixed integer programming model is developed to determine the amount of hiring, firing, training and overtime for each worker type.Findings: The results indicate that the worker differences should be considered in workforce scheduling to generate realistic plans with minimum costs. This paper also investigates the effects of human fatigue and recovery on the performance of the production systems.Research limitations/implications: In this research, there are some assumptions that might affect the accuracy of the model such as the assumption of certainty of the demand in each period, and the linearity function of Fatigue accumulation and recovery curves. These assumptions can be relaxed in future work.Originality/value: In this research, a new model for integrating workers’ differences with workforce scheduling is proposed. To the authors' knowledge, it is the first time to study the effects of different important human factors such as human personality, skills and fatigue and recovery in the workforce scheduling process. This research shows that considering both technical and human factors together can reduce the costs in manufacturing systems and ensure the safety of the workers.

  4. [The improvement of the abilities to maintain motor coordination and equilibrium in the students presenting with the functional disorders of the musculoskeletal system by introducing the elements of therapeutic physical training into the structure of academic schedule of physical education].

    Science.gov (United States)

    Kapilevich, L V; Davlet'yarova, K V; Ovchinnikova, N A

    The problem of deterioration of the health status in the university students at present remains as topical as it was before being a major cause of impaired working capacity, disability and/or poor social adaptation of the large number of graduates. It has been proposed to introduce a class of therapeutic physical training (TPT) into the schedule of physical education for the students. The objective of the present study was to evaluate the effectiveness of the formation of the skills needed to maintain motor coordination and equilibrium in the students presenting with the functional disorders of the musculoskeletal system (MSS) including scoliosis by the introduction of the elements of therapeutic physical training into their academic schedules. The main study group was comprised of 32 students (men) at the age of 18-19 years presenting with the disorders of the musculoskeletal system (type III scoliosis, osteochondropathy, and osteochondrosis). The students of this group received a curriculum aimed at improving their motor skills with the emphasis laid on the selected elements of therapeutic physical training. The control group was composed of 17 students without disorders of the musculoskeletal system who attended the physical education classes following the traditional program. The coordination abilities and balance skills were evaluated based on the analysis with the use of the Stabilan-1 stabilographic apparatus. In addition, the stability test and the Romberg test with open and closed eyes were performed. The results of the study give evidence that the introduction of the elements of therapeutic physical training into the structure of academic schedule of physical education for the students suffering from diseases of the musculoskeletal system has beneficial effect on the parameters of stability and the general ability to maintain the posture and balance. Specifically, in the beginning of the academic year, the students of the main study group presenting with

  5. Daily Distribution of Carbohydrate, Protein and Fat Intake in Elite Youth Academy Soccer Players Over a 7-day Training Period

    OpenAIRE

    Naughton, Robert; Drust, Barry; O’Boyle, Andy; Morgans, Ryland; Abayomi, Julie; Davies, Ian G.; Morton, James P.; Mahon, Elizabeth

    2016-01-01

    While traditional approaches to dietary analysis in athletes have focused on total daily energy and macronutrient intake, it is now thought that daily distribution of these parameters can also influence training adaptations. Using seven-day food diaries, we quantified the total daily macronutrient intake and distribution in elite youth soccer players from the English Premier League in U18 (n=13), U15/16 (n=25) and U13/14 squads (n=21). Total energy (43.1±10.3, 32.6±7.9, 28.1±6.8 kcal∙kg-1∙day...

  6. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  7. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  8. Sustained effect of resistance training on blood pressure and hand grip strength following a detraining period in elderly hypertensive women: a pilot study

    Directory of Open Access Journals (Sweden)

    Nascimento D da C

    2014-01-01

    Full Text Available Dahan da Cunha Nascimento,1,5,8 Ramires Alsamir Tibana,1,8 Franklin M Benik,2 Keila Elizabeth Fontana,3 Frederico Ribeiro Neto,8 Frederico Santos de Santana,5,8 Leopoldo Santos-Neto,4 Renato André Sousa Silva,1,5,6 Alessandro Oliveira Silva,1,7 Darlan Lopes Farias,1,7 Sandor Balsamo,4,5,8 Jonato Prestes1 1Postgraduate Program in Physical Education, Catholic University of Brasilia, Brasilia, Brazil; 2Department of Kinesiology and Sports Studies Graduate Program, Eastern Illinois University, Charleston, IL, USA; 3Faculty of Physical Education, University of Brasilia, Brasilia, Brazil; 4Graduate Program in Medical Sciences of the University of Brasilia, School of Medicine and Rheumatology Service, University Hospital of Brasilia (HUB, Brasilia, Brazil; 5Department of Physical Education, University Center Euro American University Center, Brasilia, Brazil; 6Center of Excellence in Medicine of Exercise (CEMEx, Brasilia, Brazil; 7Center University of Brasilia (UNICEUB, Brasilia, Brazil; 8Strength Training and Health Research Group (GEPEEFS, Brasilia, Brazil Introduction: Hypertension is the most prevalent modifiable risk factor with a high prevalence among older adults. Exercise is a nonpharmacological treatment shown to benefit all patients with hypertension. Objective: This study examined the effects of a 14-week moderate intensity resistance training program (RT on the maintenance of blood pressure and hand grip strength during an extended detraining period in elderly hypertensive women. Methods: Twelve hypertensive sedentary elderly women completed 14 weeks of whole body RT at a moderate perceived exertion following a detraining period of 14 weeks. Results: Following the training period, participants demonstrated an increase in absolute hand grip strength (P=0.001, relative hand grip strength (P=0.032 and a decrease of systolic (P=0.001, diastolic (P=0.008, and mean blood pressure (P=0.002 when compared to pre-exercise values. In addition, these

  9. The effects of menopausal health training for spouses on women's quality of life during menopause transitional period.

    Science.gov (United States)

    Bahri, Narjes; Yoshany, Nooshin; Morowatisharifabad, Mohammad Ali; Noghabi, Ali Delshad; Sajjadi, Moosa

    2016-02-01

    Spouses' support during menopausal transition has an important role for improving the quality of life in postmenopausal women. Since the first step in providing support is having adequate knowledge, this study aimed to investigate the effects of an educational program on menopause health for spouses on women's quality of life during the menopausal transition. This clinical trial was conducted in Yazd, Iran. A hundred healthy women aged 45 to 60 years were recruited by random sampling. The spouses in the intervention group (n = 50) attended three training sessions about the management and health of menopausal transition. The spouses in the control group (n = 50) did not receive any intervention. Knowledge and performance about menopausal health were assessed in all spouses before and 3 months after intervention. All women were assessed by the Menopause Rating Scale, and the Menopause Quality of Life questionnaire before and 3 months after educational intervention. Analyses were carried out using SPSS 16 software. The level of significance was set at P less than 0.05. The knowledge and performance of spouses in the intervention group were significantly higher 3 months after intervention (P women in the intervention group was higher 3 months after intervention (P training of menopausal health for spouses improves the quality of life in women during menopausal transition. We suggest integrating such educational programs in menopausal management programs.

  10. The impact of a 17-day training period for an international championship on mucosal immune parameters in top-level basketball players and staff members.

    Science.gov (United States)

    Moreira, Alexandre; Arsati, Franco; Cury, Patrícia Ramos; Franciscon, Clóvis; Simões, Antonio Carlos; de Oliveira, Paulo Roberto; de Araújo, Vera Cavalcanti

    2008-10-01

    This investigation examined the impact of a 17-d training period (that included basketball-specific training, sprints, intermittent running exercises, and weight training, prior to an international championship competition) on salivary immunoglobulin A (SIgA) levels in 10 subjects (athletes and staff members) from a national basketball team, as a biomarker for mucosal immune defence. Unstimulated saliva samples were collected at rest at the beginning of the preparation for the Pan American Games and 1 d before the first game. The recovery interval from the last bout of exercise was 4 h. The SIgA level was measured using enzyme-linked immunosorbent assay and expressed as absolute concentrations, secretion rate, and SIgA level relative to total protein. The decrease in SIgA levels following training was greater in athletes than in support staff; however, no significant differences between the two groups were detected. A decrease in SIgA level, regardless of the method used to express IgA results, was verified for athletes. Only one episode of upper respiratory tract illness symptoms was reported, and it was not associated with changes in SIgA levels. In summary, a situation of combined stress for an important championship was found to decrease the level of SIgA-mediated immune protection at the mucosal surface in team members, with greater changes observed in the athletes.

  11. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  12. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  13. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  14. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  15. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  16. A cross-sectional analysis of barriers to health-care seeking among medical students across training period

    Directory of Open Access Journals (Sweden)

    Vikas Menon

    2017-01-01

    Full Text Available Background and Aims: Very little information is available on how needs and perceptions to service utilization may change with duration of medical training. Our objective was to compare the self-reported barriers to health-care seeking for mental and physical health services separately between 1st year and final year medical students. Methods: In this cross-sectional study, we invited all medical students of the concerned cohorts to complete a prevalidated checklist and 28-item self-reported questionnaire about perceived barriers to health-care seeking. The questionnaire had separate items pertaining to usage of mental and physical health-care services. Results: The response rate of the 1st year and final year cohorts were 83.8% and 86.6%, respectively. Lack of time, unawareness about where to seek help, cost issues, and fear of future academic jeopardy were more common concerns among 1st year students to the usage of mental health services (odds ratio [OR] 0.27, 0.45,0.09, and 0.49, respectively whereas issues of stigma were more commonly reported by final year students for using mental health services (OR = 2.87. In contrast, the barriers in using physical health services were broadly comparable between the two cohorts. Conclusion: Differences exist between medical students in various years of training particularly with regard to self-reported barriers and perceptions particularly about using mental health-care services. This may have key implications for designing and delivery of service provisions in this group.

  17. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  18. Effect of rehabilitation training combined with hyperbaric oxygen therapy on the nerve cytokine secretion and oxidative stress in rehabilitation period of patients with cerebral infarction

    Directory of Open Access Journals (Sweden)

    Ling Kong

    2017-11-01

    Full Text Available Objective: To discuss the influence of rehabilitation training combined with hyperbaric oxygen therapy on the nerve cytokine secretion and oxidative stress in rehabilitation period of patients with cerebral infarction. Methods: A total of 110 patients with cerebral infarction who received rehabilitation therapy in the hospital between January 2015 and May 2017 were divided into routine group (n=55 and hyperbaric oxygen group (n=55 according to random number table. Routine group received regular rehabilitation training, and hyperbaric oxygen group underwent rehabilitation training combined with hyperbaric oxygen therapy. The differences in the serum contents of nerve factors, neurotransmitters and oxidative stress indexes were compared between the two groups at immediately after admission (T0 and after 14 d of treatment (T1. Results: At T0, there was no statistically significant difference in the serum contents of nerve factors, neurotransmitters and oxidative stress indexes between the two groups. At T1, serum nerve factors MBP and NSE contents of hyperbaric oxygen group were lower than those of routine group while NGF content was higher than that of routine group; serum neurotransmitter Glu content was lower than that of routine group while GABA content was higher than that of routine group; serum oxidative stress indexes ROS and LHP contents were lower than those of routine group while CAT and SOD contents were higher than those of routine group. Conclusion: Rehabilitation training combined with hyperbaric oxygen therapy can effectively optimize the nerve function and inhibit the systemic oxidative stress response in rehabilitation period of patients with cerebral infarction.

  19. The effect of a positive reappraisal coping intervention and problem-solving skills training on coping strategies during waiting period of IUI treatment: An RCT

    Science.gov (United States)

    Ghasemi, Marzieh; Kordi, Masoumeh; Asgharipour, Negar; Esmaeili, Habibollah; Amirian, Maliheh

    2017-01-01

    Background: Waiting period of fertility treatment is stressful, therefore it is necessary to use effective coping strategies to cope with waiting period of intrauterine insemination (IUI) treatment. Objective: The aim of this study was comparing the effect of the positive reappraisal coping intervention (PRCI) with the problem-solving skills training (PSS) on the coping strategies of IUI waiting period, in infertile women referred to Milad Infertility Center in Mashhad. Materials and Methods: In this randomized clinical trial, 108 women were evaluated into three groups. The control group received the routine care, but in PRCI group, two training sessions were held and they were asked to review the coping thoughts cards and fill out the daily monitoring forms during the waiting period, and in PSS group problem-solving skill were taught during 3 sessions. The coping strategies were compared between three groups on the 10th day of IUI waiting period. Results: Results showed that the mean score for problem-focused were significantly different between the control (28.54±9.70), PSS (33.71±9.31), and PRCI (30.74±10.96) (p=0.025) groups. There were significant differences between the PSS group and others groups, and mean emotion-focused were significantly different between the control (32.09±11.65), PSS (29.20±9.88), and PRCI (28.74±7.96) (p=0.036) groups. There were significant differences between the PRCI and the control group (p=0.047). Conclusion: PSS was more effective to increase problem-focused coping strategies than PRCI, therefore it is recommended that this intervention should be used in infertility treatment centers. PMID:29404530

  20. The effect of a positive reappraisal coping intervention and problem-solving skills training on coping strategies during waiting period of IUI treatment: An RCT.

    Science.gov (United States)

    Ghasemi, Marzieh; Kordi, Masoumeh; Asgharipour, Negar; Esmaeili, Habibollah; Amirian, Maliheh

    2017-11-01

    Waiting period of fertility treatment is stressful, therefore it is necessary to use effective coping strategies to cope with waiting period of intrauterine insemination (IUI) treatment. The aim of this study was comparing the effect of the positive reappraisal coping intervention (PRCI) with the problem-solving skills training (PSS) on the coping strategies of IUI waiting period, in infertile women referred to Milad Infertility Center in Mashhad. In this randomized clinical trial, 108 women were evaluated into three groups. The control group received the routine care, but in PRCI group, two training sessions were held and they were asked to review the coping thoughts cards and fill out the daily monitoring forms during the waiting period, and in PSS group problem-solving skill were taught during 3 sessions. The coping strategies were compared between three groups on the 10 th day of IUI waiting period. Results showed that the mean score for problem-focused were significantly different between the control (28.54±9.70), PSS (33.71±9.31), and PRCI (30.74±10.96) (p=0.025) groups. There were significant differences between the PSS group and others groups, and mean emotion-focused were significantly different between the control (32.09±11.65), PSS (29.20±9.88), and PRCI (28.74±7.96) (p=0.036) groups. There were significant differences between the PRCI and the control group (p=0.047). PSS was more effective to increase problem-focused coping strategies than PRCI, therefore it is recommended that this intervention should be used in infertility treatment centers.

  1. The effect of a positive reappraisal coping intervention and problem-solving skills training on coping strategies during waiting period of IUI treatment: An RCT

    Directory of Open Access Journals (Sweden)

    Marzieh Ghasemi

    2017-11-01

    Full Text Available Background: Waiting period of fertility treatment is stressful, therefore it is necessary to use effective coping strategies to cope with waiting period of intrauterine insemination (IUI treatment. Objective: The aim of this study was comparing the effect of the positive reappraisal coping intervention (PRCI with the problem-solving skills training (PSS on the coping strategies of IUI waiting period, in infertile women referred to Milad Infertility Center in Mashhad. Materials and Methods: In this randomized clinical trial, 108 women were evaluated into three groups. The control group received the routine care, but in PRCI group, two training sessions were held and they were asked to review the coping thoughts cards and fill out the daily monitoring forms during the waiting period, and in PSS group problem-solving skill were taught during 3 sessions. The coping strategies were compared between three groups on the 10th day of IUI waiting period. Results: Results showed that the mean score for problem-focused were significantly different between the control (28.54±9.70, PSS (33.71±9.31, and PRCI (30.74±10.96 (p=0.025 groups. There were significant differences between the PSS group and others groups, and mean emotion-focused were significantly different between the control (32.09±11.65, PSS (29.20±9.88, and PRCI (28.74±7.96 (p=0.036 groups. There were significant differences between the PRCI and the control group (p=0.047. Conclusion: PSS was more effective to increase problem-focused coping strategies than PRCI, therefore it is recommended that this intervention should be used in infertility treatment centers.

  2. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  3. Management Training in Retailing.

    Science.gov (United States)

    Veness, C. Rosina

    Intended for prospective members of the new Distributive Industrial Training Board in Great Britain, this training guide concentrates on managerial functions in retailing; the selection of trainees; the planning of in-company and external training programs; scheduling and continuity of training; roles of training personnel; and the use of various…

  4. [Specific features of the functional state of the cardiorespiratory system in athletes differing in the types of muscular activity during the preparatory period of the training cycle].

    Science.gov (United States)

    Ivanova, N B

    2011-01-01

    The present study of the functional state of the cadiorespiratory system included athletes engaged in cyclic team sports. The state of the cardiorespiratory system was estimated from the measurement of central hemodynamics and cardiac rhythm variability, results of electrocardiography, spirography, and pneumotachography performed during the preparatory period for the training cycle. It was shown that the cardiovascular and respiratory systems as well as vegetative regulation of the cardiac rhythm of the athletes under examination underwent differently directed structural modification depending on the specific patterns of muscular activity.

  5. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  6. Daily Distribution of Carbohydrate, Protein and Fat Intake in Elite Youth Academy Soccer Players Over a 7-Day Training Period.

    Science.gov (United States)

    Naughton, Robert J; Drust, Barry; O'Boyle, Andy; Morgans, Ryland; Abayomi, Julie; Davies, Ian G; Morton, James P; Mahon, Elizabeth

    2016-10-01

    While traditional approaches to dietary analysis in athletes have focused on total daily energy and macronutrient intake, it is now thought that daily distribution of these parameters can also influence training adaptations. Using 7-day food diaries, we quantified the total daily macronutrient intake and distribution in elite youth soccer players from the English Premier League in U18 (n = 13), U15/16 (n = 25) and U13/14 squads (n = 21). Total energy (43.1 ± 10.3, 32.6 ± 7.9, 28.1 ± 6.8 kcal·kg -1 ·day -1 ), CHO (6 ± 1.2, 4.7 ± 1.4, 3.2 ± 1.3 g·kg - 1 ·day -1 ) and fat (1.3 ± 0.5, 0.9 ± 0.3, 0.9 ± 0.3 g·kg- 1 ·day -1 ) intake exhibited hierarchical differences (p U15/16 > U18. In addition, CHO intake in U18s was lower (p lunch (~0.5 g·kg -1 ) > breakfast (~0.3 g·kg -1 ). We conclude elite youth soccer players do not meet current CHO guidelines. Although daily protein targets are achieved, we report a skewed daily distribution in all ages such that dinner > lunch > breakfast. Our data suggest that dietary advice for elite youth players should focus on both total daily macronutrient intake and optimal daily distribution patterns.

  7. An Integrated, Multifactorial Approach to Periodization for Optimal Performance in Individual and Team Sports.

    Science.gov (United States)

    Mujika, Iñigo; Halson, Shona; Burke, Louise M; Balagué, Gloria; Farrow, Damian

    2018-05-01

    Sports periodization has traditionally focused on the exercise aspect of athletic preparation, while neglecting the integration of other elements that can impact an athlete's readiness for peak competition performances. Integrated periodization allows the coordinated inclusion of multiple training components best suited for a given training phase into an athlete's program. The aim of this article is to review the available evidence underpinning integrated periodization, focusing on exercise training, recovery, nutrition, psychological skills, and skill acquisition as key factors by which athletic preparation can be periodized. The periodization of heat and altitude adaptation, body composition, and physical therapy is also considered. Despite recent criticism, various methods of exercise training periodization can contribute to performance enhancement in a variety of elite individual and team sports, such as soccer. In the latter, both physical and strategic periodization are useful tools for managing the heavy travel schedule, fatigue, and injuries that occur throughout a competitive season. Recovery interventions should be periodized (ie, withheld or emphasized) to influence acute and chronic training adaptation and performance. Nutrient intake and timing in relation to exercise and as part of the periodization of an athlete's training and competition calendar can also promote physiological adaptations and performance capacity. Psychological skills are a central component of athletic performance, and their periodization should cater to each athlete's individual needs and the needs of the team. Skill acquisition can also be integrated into an athlete's periodized training program to make a significant contribution to competition performance.

  8. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  9. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  10. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  11. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  12. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  13. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    month; the necessary rate of a month; the quantities to be completed before half period of the project; the quantities to be achieved before the cold function test. Due to a lot of documents and equipment in LANP, it is impossible to present their supply dates one by one in the level 2 project schedule. The rules, in reference to the corresponding construction starting dates, were given to define the supply dates. The good practices of construction schedule control are presented, including draft of a construction program, performance evaluation, specific coordination meeting and Work Load Point application. The schedule control culture is described, that is one core, two criteria, three control mechanisms, four resources to be secured. (author)

  14. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  15. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  16. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  17. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  18. Chapter 5: Training

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2018-04-01

    The chapter 5 presents the 1) initial training; 2) periodic training, which includes: a) periodic training for employees at lower levels of the hierarchy than that of the operator; b) period training for operators; 3) operator training; 4) record of training; 5) safety culture.

  19. Periodically-modulated inhibition of living pacemaker neurons--III. The heterogeneity of the postsynaptic spike trains, and how control parameters affect it.

    Science.gov (United States)

    Segundo, J P; Vibert, J F; Stiber, M

    1998-11-01

    Codings involving spike trains at synapses with inhibitory postsynaptic potentials on pacemakers were examined in crayfish stretch receptor organs by modulating presynaptic instantaneous rates periodically (triangles or sines; frequencies, slopes and depths under, respectively, 5.0 Hz, 40.0/s/s and 25.0/s). Timings were described by interspike and cross-intervals ("phases"); patterns (dispersions, sequences) and forms (timing classes) were identified using pooled graphs (instant along the cycle when a spike occurs vs preceding interval) and return maps (plots of successive intervals). A remarkable heterogeneity of postsynaptic intervals and phases characterizes each modulation. All cycles separate into the same portions: each contains a particular form and switches abruptly to the next. Forms differ in irregularity and predictability: they are (see text) "p:q alternations", "intermittent", "phase walk-throughs", "messy erratic" and "messy stammering". Postsynaptic cycles are asymmetric (hysteresis). This contrasts with the presynaptic homogeneity, smoothness and symmetry. All control parameters are, individually and jointly, strongly influential. Presynaptic slopes, say, act through a postsynaptic sensitivity to their magnitude and sign; when increasing, hysteresis augments and forms change or disappear. Appropriate noise attenuates between-train contrasts, providing modulations are under 0.5 Hz. Postsynaptic natural intervals impose critical time bases, separating presynaptic intervals (around, above or below them) with dissimilar consequences. Coding rules are numerous and have restricted domains; generalizations are misleading. Modulation-driven forms are trendy pacemaker-driven forms. However, dissimilarities, slight when patterns are almost pacemaker, increase as inhibition departs from pacemaker and incorporate unpredictable features. Physiological significance-(1) Pacemaker-driven forms, simple and ubiquitous, appear to be elementary building blocks of

  20. The impact of duration on effectiveness of exercise, the implication for periodization of training and goal setting for individuals who are overfat, a meta-analysis.

    Science.gov (United States)

    Clark, J E

    2016-12-01

    Given the assumption that all methods of exercise, e.g., endurance (ET), resistance (RT), or combination of both (E+R), can induce a beneficial effect size (ES) for changes in body composition and health status of individuals who are overfat. Thus the aim and purpose of this study is to evaluate the current body of knowledge to address the question as to the impact that the duration of exercise has on its relative effectiveness for inducing health and body compositional changes in individuals who are overfat to assist with developing periodized exercise protocols and establishing short and long term goals. A tiered meta-analysis of 92-studies and 200-exercise groupings were used for establishing pooled ES within and between groupings based on the increments of 4-week of duration and study designs of ≤8, 9-16, 17-23, 24-36, and ≥36 weeks. Analysis based on random-effect of response indicates a continuum of effectiveness within and between ET, RT and E+R based on duration. Where beneficial effectiveness is not indicated for any measures until after 8-weeks of continuous training with progressive effectiveness being noted in changes to cardiorespiratory fitness, inflammatory cytokines, and alteration of metabolic status from 12-weeks through 32-weeks of continuous training. Results indicate a greater ES for RT and E+R versus ET early in intervention that equalizes with longer durations. Supporting the use of RT and E+R within a periodized program. And secondarily, goals should be established first on performance gains and second body composition or health status modifications for the individual who is overfat.

  1. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  2. Strong Relaxations for the Train Timetabling Problem Using Connected Configurations

    OpenAIRE

    Fischer, Frank; Schlechte, Thomas

    2017-01-01

    The task of the train timetabling problem or track allocation problem is to find conflict free schedules for a set of trains with predefined routes in a railway network. Especially for non-periodic instances models based on time expanded networks are often used. Unfortunately, the linear programming relaxation of these models is often extremely weak because these models do not describe combinatorial relations like overtaking possibilities very well. In this paper we extend the model by so cal...

  3. Optimization of Daily Flight Training Schedules

    Science.gov (United States)

    2014-03-01

    iep iep ip X s e p Y i e p L i e p W...SOLO L CQ CQ | | 2 , | d d d iep iep ip p P p Pe e E e e E p P P Y L W i d i I               (3) SOLO L CQ | | 2 , | d d iep ... iep p P p Pe e E e e E Y L i d i I           (4) 1 , | , "CQ" o s sep s p p X s e e C e      (5) 0 0 | 2 , s d s sep s e C p

  4. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  5. Robust Aircraft Squadron Scheduling in the Face of Absenteeism

    National Research Council Canada - National Science Library

    Gokcen, Osman B

    2008-01-01

    Air Force fighter aircraft squadrons the world over share a unique problem. Each requires complex training schedules coupling aircraft to pilots, the duo to missions and airspaces, and then the entire combination to a feasible time slot...

  6. The effect of a professional cricket match schedule on selected ...

    African Journals Online (AJOL)

    Enrique

    becoming more frequent and training schedules increasingly intense. In addition to ... marathon runners reported increased URTS in faster run- ners,23 a more ..... competitive versus recreational sports in cross-country skiing. Int J Sports.

  7. The Effect of the Interval Training During 8-Week Preparation Period on the Athletic Performances of 9-12 Year Old Swimmers

    OpenAIRE

    SEVER, M. Onur; CICIOGLU, H. Ibrahim

    2018-01-01

    The aim of this study was to determine the effect ofinterval training on the athletic performances of 9-12 years old swimmers inaddition to the eight-week preparation stage. Athletes were split into twogroups as the ones with performing branch specific swimming training (n=9) andthe ones with performing interval training along with swimming training (n=11).Before and after training programs, 12-minutes Cooper test was applied todetermine aerobic endurance in both groups. Wingate test was used...

  8. Locomotive Schedule Optimization for Da-qin Heavy Haul Railway

    Directory of Open Access Journals (Sweden)

    Ruiye Su

    2015-01-01

    Full Text Available The main difference between locomotive schedule of heavy haul railways and that of regular rail transportation is the number of locomotives utilized for one train. One heavy-loaded train usually has more than one locomotive, but a regular train only has one. This paper develops an optimization model for the multilocomotive scheduling problem (MLSP through analyzing the current locomotive schedule of Da-qin Railway. The objective function of our paper is to minimize the total number of utilized locomotives. The MLSP is nondeterministic polynomial (NP hard. Therefore, we convert the multilocomotive traction problem into a single-locomotive traction problem. Then, the single-locomotive traction problem (SLTP can be converted into an assignment problem. The Hungarian algorithm is applied to solve the model and obtain the optimal locomotive schedule. We use the variance of detention time of locomotives at stations to evaluate the stability of locomotive schedule. In order to evaluate the effectiveness of the proposed optimization model, case studies for 20 kt and 30 kt heavy-loaded combined trains on Da-qin Railway are both conducted. Compared to the current schedules, the optimal schedules from the proposed models can save 62 and 47 locomotives for 20 kt and 30 kt heavy-loaded combined trains, respectively. Therefore, the effectiveness of the proposed model and its solution algorithm are both valid.

  9. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  10. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  11. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  12. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  13. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  14. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  16. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  17. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  18. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  19. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  20. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  1. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  2. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  3. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  4. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  5. A Comparison of Escalating versus Fixed Reinforcement Schedules on Undergraduate Quiz Taking

    Science.gov (United States)

    Mahoney, Amanda

    2017-01-01

    Drug abstinence studies indicate that escalating reinforcement schedules maintain abstinence for longer periods than fixed reinforcement schedules. The current study evaluated whether escalating reinforcement schedules would maintain more quiz taking than fixed reinforcement schedules. During baseline and for the control group, bonus points were…

  6. The Synthesis of a Hardware Scheduler for Non-Manifest Loops

    NARCIS (Netherlands)

    Mansour, O.; Molenkamp, Egbert; Krol, Th.

    This paper addresses the hardware implementation of a dynamic scheduler for non-manifest data dependent periodic loops. Static scheduling techniques which are known to give near optimal scheduling-solutions for manifest loops, fail at scheduling non-manifest loops, since they lack the run time

  7. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  8. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  9. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    2014-01-01

    significant practical implications, is the minimization of the TDM schedule period by over-provisioning bandwidth to connections with the smallest bandwidth requirements. Our results show that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different...... applications from the MCSL NOC benchmark suite. In the special case of all-to-all communication with equal bandwidths on all communication channels, we obtain schedules with a shorter period than reported in previous work....

  10. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  11. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  12. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  13. Field training

    International Nuclear Information System (INIS)

    Mumford, G.E.; Hadaway, E.H.

    1991-01-01

    Individualized, personal training can be used to increase an employee's awareness of the HSE program. Such training can stimulate personal commitment and provide personal skills that can be utilized for the benefit of the overall HSE effort. But, providing such training within our industry can be a difficult task due to the scheduling, travel arrangements, and cost associated with bringing employees from isolated, remote locations to centrally located training facilities. One method of overcoming these obstacles involves the use of field instructors to provide the training at the many, and varied number of individuals can be reached with minimal disruption to their work scheduling or to their time off. In fact, this type of on-site training is already used by some oil companies and drilling contractors with encouraging results. This paper describes one drilling contractor's experiences with such a training program. The results after eight years how that this program not only can provide and efficient, economical means of employee training, but also can have a direct application to employee motivation regarding a company's HSE effort

  14. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  15. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  16. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  17. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  18. Training and qualification of inspectors

    International Nuclear Information System (INIS)

    Aro, I.; Anderson, R.; Ericsson, P.O.; Lee, I.

    1993-01-01

    A total of four workshop breakout sessions were conducted on this subject: one double session and three single sessions. The following discussion describes common points and difference among the countries in the areas of inspector training and qualifications. In most countries there are resident or non-resident site-specific inspectors who have general plant supervision duties. In addition, there are specialized inspectors who visit NPP when requested or according to the scheduled inspection program. Most countries try to recruit experienced personnel. Many countries prefer to have candidates who have extensive plant experience. Some countries do not recruit inspectors from utilities because of potential conflict of interest or credibility reasons. In many countries, the typical training time to become an independent inspector is one year. In some countries an inspector is formally certified after their training period and completion of an examination

  19. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  20. Direct block scheduling technology: Analysis of Avidity

    Directory of Open Access Journals (Sweden)

    Felipe Ribeiro Souza

    Full Text Available Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.

  1. Computation and evaluation of scheduled waiting time for railway networks

    DEFF Research Database (Denmark)

    Landex, Alex

    2010-01-01

    Timetables are affected by scheduled waiting time (SWT) that prolongs the travel times for trains and thereby passengers. SWT occurs when a train hinders another train to run with the wanted speed. The SWT affects both the trains and the passengers in the trains. The passengers may be further...... affected due to longer transfer times to other trains. SWT can be estimated analytically for a given timetable or by simulation of timetables and/or plans of operation. The simulation of SWT has the benefit that it is possible to examine the entire network. This makes it possible to improve the future...

  2. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  3. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  4. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  5. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  6. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  7. Organisation of Dietary Control for Nutrition-Training Intervention Involving Periodized Carbohydrate (CHO) Availability and Ketogenic Low CHO High Fat (LCHF) Diet.

    Science.gov (United States)

    Mirtschin, Joanne G; Forbes, Sara F; Cato, Louise E; Heikura, Ida A; Strobel, Nicki; Hall, Rebecca; Burke, Louise M

    2018-02-12

    We describe the implementation of a 3-week dietary intervention in elite race walkers at the Australian Institute of Sport, with a focus on the resources and strategies needed to accomplish a complex study of this scale. Interventions involved: traditional guidelines of high carbohydrate (CHO) availability for all training sessions (HCHO); a periodized CHO diet which integrated sessions with low CHO and high CHO availability within the same total CHO intake, and a ketogenic low-CHO high-fat diet (LCHF). 7-day menus and recipes were constructed for a communal eating setting to meet nutritional goals as well as individualized food preferences and special needs. Menus also included nutrition support pre, during and post-exercise. Daily monitoring, via observation and food checklists, showed that energy and macronutrient targets were achieved: diets were matched for energy (~14.8 MJ/d) and protein (~2.1 g.kg/d), and achieved desired differences for fat and CHO: HCHO and PCHO: CHO = 8.5 g/kg/d, 60% energy; fat = 20% of energy; LCHF: 0.5 g/kg/d CHO, fat = 78% energy. There were no differences in micronutrient intakes or density between HCHO and PCHO diets; however, the micronutrient density of LCHF was significantly lower. Daily food costs per athlete were similar for each diet (~AUDS$27 ± 10). Successful implementation and monitoring of dietary interventions in sports nutrition research of the scale of the present study require meticulous planning and the expertise of chefs and sports dietitians. Different approaches to sports nutrition support raise practical challenges around cost, micronutrient density, accommodation of special needs and sustainability.

  8. Solving Large Scale Crew Scheduling Problems in Practice

    NARCIS (Netherlands)

    E.J.W. Abbink (Erwin); L. Albino; T.A.B. Dollevoet (Twan); D. Huisman (Dennis); J. Roussado; R.L. Saldanha

    2010-01-01

    textabstractThis paper deals with large-scale crew scheduling problems arising at the Dutch railway operator, Netherlands Railways (NS). NS operates about 30,000 trains a week. All these trains need a driver and a certain number of guards. Some labor rules restrict the duties of a certain crew base

  9. Solving cyclical nurse scheduling problem using preemptive goal programming

    Science.gov (United States)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  10. Hierarchical Scheduling Framework Based on Compositional Analysis Using Uppaal

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    This paper introduces a reconfigurable compositional scheduling framework, in which the hierarchical structure, the scheduling policies, the concrete task behavior and the shared resources can all be reconfigured. The behavior of each periodic preemptive task is given as a list of timed actions, ...

  11. Duality-based algorithms for scheduling on unrelated parallel machines

    NARCIS (Netherlands)

    van de Velde, S.L.; van de Velde, S.L.

    1993-01-01

    We consider the following parallel machine scheduling problem. Each of n independent jobs has to be scheduled on one of m unrelated parallel machines. The processing of job J[sub l] on machine Mi requires an uninterrupted period of positive length p[sub lj]. The objective is to find an assignment of

  12. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  13. How shift scheduling practices contribute to fatigue amongst freight rail operating employees: Findings from Canadian accident investigations.

    Science.gov (United States)

    Rudin-Brown, Christina M; Harris, Sarah; Rosberg, Ari

    2018-02-01

    Canada's freight rail system moves 70% of the country's surface goods and almost half of all exports (RAC, 2016). These include dangerous goods. Anonymous survey of freight rail operating employees conducted by the Teamsters Canada Rail Conference (TCRC, 2014) revealed that many do not report getting enough sleep because of their work schedules, and that fatigue may be affecting their performance at work. Besides general impairments in attention and cognitive functioning, fatigue in railway operating employees slows reaction time to safety alarms and impairs conformance to train operating requirements. Shift scheduling practices can contribute to sleep-related fatigue by restricting sleep opportunities, requiring extended periods of wakefulness and by disrupting daily (circadian) rhythms. The primary goal of accident investigation is to identify causal and contributing factors so that similar occurrences can be prevented. A database search of Transportation Safety Board (TSB) rail investigation reports published in the 21-year period from 1995 to 2015 identified 18 that cited sleep-related fatigue of freight rail operating employees as a causal, contributing, or risk finding. This number represents about 20% of TSB rail investigations from the same period in which a human factors aspect of freight train activities was a primary cause. Exploration of accident themes suggests that management of fatigue and shift scheduling in the freight rail industry is a complex issue that is often not conducive to employee circadian rhythms and sleep requirements. It also suggests that current shift scheduling and fatigue management practices may be insufficient to mitigate the associated safety risk. Railway fatigue management systems that are based on the principles of modern sleep science are needed to improve scheduling practices and mitigate the ongoing safety risk. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  14. The spirit of St. Lucie: nuclear plant built on schedule

    International Nuclear Information System (INIS)

    Derrickson, W.B.

    1984-01-01

    Florida Power and Light Company currently has four nuclear units in operation with St. Lucie Unit 2 being the last to receive an operating license in June, 1983. It's sister Unit 1 received its license in 1976 and has, through 1982, compiled one of the best operating records in the United States. The full power license for St. Lucie Unit 2 was received from the Nuclear Regulatory Commission (NRC) on June 10, 1983, just six years after construction began. The industry average for construction of nuclear plants in this time period is about 10 years. The success of the St. Lucie Unit 2 project can be at least in part attributed to planning the work, accurate and timely reporting of results via valid indicators, well trained and skilled personnel, and most of all, teamwork. During the course of the project the plant was constantly on or near schedule and always ahead of industry averages. This was done despite issuance of numerous regulations by the NRC (TMI), a 1979 hurricane which did considerable damage to the Reactor Auxiliary Building, labor problems, and an NRC schedule review team that determined the best that could be done was to complete the plant a year later. The final price tag is about $1.42 billion, including ''allowance for funds used during construction''. In operation to date the post core loading test program has been completed in less than two months, enabling the plant to be put into commercial operation only two months after its original scheduled date of May 28, 1983exclamation

  15. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  16. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPP's. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under the direct supervision of the trainer within 4 to 10 weeks after the successful completion of both written and oral of examinations. Last year the committee held ten sessions for the oral theoretical examination. The number of licenses issued in 2001 and the total number of valid licenses is given. Conclusions from inspections and tests as well as results from operation and start up of nuclear units confirm that in this area a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for UJD staff for 2001. This training composed of specialised qualification study, functional study, as well as study aimed at maintaining qualification (continual and periodical exercise). Training courses organised by the Government Office of Slovakia and the IAEA were also of a significant benefit and UJD staff participated on foreign training courses, seminars and conferences, focusing on maintaining and improvement of professional skills

  17. Crew Scheduling Considering both Crew Duty Time Difference and Cost on Urban Rail System

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2016-11-01

    Full Text Available Urban rail crew scheduling problem is to allocate train services to crews based on a given train timetable while satisfying all the operational and contractual requirements. In this paper, we present a new mathematical programming model with the aim of minimizing both the related costs of crew duty and the variance of duty time spreads. In addition to iincorporating the commonly encountered crew scheduling constraints, it also takes into consideration the constraint of arranging crews having a meal in the specific meal period of one day rather than after a minimum continual service time. The proposed model is solved by an ant colony algorithm which is built based on the construction of ant travel network and the design of ant travel path choosing strategy. The performances of the model and the algorithm are evaluated by conducting case study on Changsha urban rail. The results indicate that the proposed method can obtain a satisfactory crew schedule for urban rails with a relatively small computational time.

  18. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  19. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  20. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  1. Using the principles of circadian physiology enhances shift schedule design

    International Nuclear Information System (INIS)

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance and alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced

  2. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  3. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  4. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  5. Application of coupled symbolic and numeric processing to an advanced scheduling system for plant construction

    International Nuclear Information System (INIS)

    Kobayashi, Yasuhiro; Takamoto, Masanori; Nonaka, Hisanori; Yamada, Naoyuki

    1994-01-01

    A scheduling system has been developed by integrating symbolic processing functions for constraint handling and modification guidance, with numeric processing functions for schedule optimization and evaluation. The system is composed of an automatic schedule generation module, interactive schedule revision module and schedule evaluation module. The goal of the problem solving is the flattening of the daily resources requirement throughout the scheduling period. The automatic schedule generation module optimizes the initial schedule according to the formulatable portion of requirement description specified in a predicate-like language. A planning engineer refines the near-goal schedule through a knowledge-based interactive optimization process to obtain the goal schedule which fully covers the requirement description, with the interactive schedule revision module and schedule evaluation module. A scheduling system has been implemented on the basis of the proposed problem solving framework and experimentally applied to real-world sized scheduling problems for plant construction. With a result of the overall plant construction scheduling, a section schedule optimization process is described with the emphasis on the symbolic processing functions. (author)

  6. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  7. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  8. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  9. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  10. The effect of session order on the physiological, neuromuscular, and endocrine responses to maximal speed and weight training sessions over a 24-h period.

    Science.gov (United States)

    Johnston, Michael; Johnston, Julia; Cook, Christian J; Costley, Lisa; Kilgallon, Mark; Kilduff, Liam P

    2017-05-01

    Athletes are often required to undertake multiple training sessions on the same day with these sessions needing to be sequenced correctly to allow the athlete to maximize the responses of each session. We examined the acute effect of strength and speed training sequence on neuromuscular, endocrine, and physiological responses over 24h. 15 academy rugby union players completed this randomized crossover study. Players performed a weight training session followed 2h later by a speed training session (weights speed) and on a separate day reversed the order (speed weights). Countermovement jumps, perceived muscle soreness, and blood samples were collected immediately prior, immediately post, and 24h post-sessions one and two respectively. Jumps were analyzed for power, jump height, rate of force development, and velocity. Blood was analyzed for testosterone, cortisol, lactate and creatine kinase. There were no differences between countermovement jump variables at any of the post-training time points (p>0.05). Likewise, creatine kinase, testosterone, cortisol, and muscle soreness were unaffected by session order (p>0.05). However, 10m sprint time was significantly faster (mean±standard deviation; speed weights 1.80±0.11s versus weights speed 1.76±0.08s; p>0.05) when speed was sequenced second. Lactate levels were significantly higher immediately post-speed sessions versus weight training sessions at both time points (ptraining does not affect the neuromuscular, endocrine, and physiological recovery over 24h. However, speed may be enhanced when performed as the second session. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  11. The effect of liquid losses in trainings during competition period on some biochemical values of u18 male judokas ( age 15-17

    Directory of Open Access Journals (Sweden)

    Nuri Muhammet Çelik

    2017-10-01

    Full Text Available Background/Objective: The purpose of this study is to investigate the effect of liquid losses occurring in training sessions during the competition period on some biochemical values of the male Judokas competing in the U18 category. Methods:  The values of the 17 male athletes, who were included in the national team at least once, were checked in our study which compares the values of athletes before the competition and immediately after the competition. Urine Density, Urine pH, BUN, Creatine and Potassium values from the biochemistry values were measured besides the age, height and weight of the athletes participating in the study. Results: As a result of the measurements made; it was found that the kg pre-test averages of the participant athletes were 67,82 ±17,87, post-test averages were 64,88±16,89, Urine Density pre-test averages were 1.017,94 ±7,08, post-test averages were 1.025±8,48, Urine pH pre-test averages were 6,15±0,70, post-test averages were 5,82±0,50, BUN pre-test averages were 15,65±3,14, post-test averages were 24,35±3,60, Creatine pre-test averages were 0,48±0,20, post-test averages were 0,93±0,41,  K Potassium pre-test averages were 4,16±0,35,  post-test averages were 4,95 ±0,64. As a result of the statistical analysis, although there was no significant difference in urine pH pre-test and post-test values, statistically significant difference was found between pre-test and post-test values in other selected parameters (p <0,05. Conclusions: As a result; it is thought that in our country in which the adjustment of the weight class is made unconsciously and unplanned, this will lead to the health problems of the athletes in many ways, especially in the later ages. Particularly in the professional sense, the health problems, which athletes who enter weight competitions and who enter at least 10 international competitions in the Olympic sense for the Judo branch a year can experience in the later ages as a result

  12. Protective Effect of Curcumin Supplementation and Light Resistance Exercises on Superoxide Dismutase Enzyme Activity and Malondialdehyde Levels in a Severe Endurance Training Period in Male Wistar Rats

    Directory of Open Access Journals (Sweden)

    A Gorzi

    2017-07-01

    Background and aim: Extreme endurance exercises lead to oxidative stress in athletes. Therefore, the purpose of this study was to investigate the effect of curcumin supplement supplementation and light resistance training on the activity of SOD and MDA levels of male Wistar rats during a 8-week endurance training. Methods: In the present experimental study, 36 male Wistar rats were randomly assigned into one of six control groups, curcumin, endurance training, exercise, after one week of information (age 9 weeks and weight 255.62 ± 19.69 grams. Endurance + resistance, endurance training + curcumin and endurance training + curcumin + resistance. Incremental endurance training (8 weeks, 5 sessions per week was performed on a special treadmill. Speed ​​and running time in the last week reached 35 m / min and 70 minutes. Resistance training (8 weeks, 2 sessions per week was performed on vertical ladder by closing the rat's weight to the tail. Rats received supplemental curcumin by intraperitoneal injection (8 weeks, 3 sessions per week, 30 mg / kg body weight. SOD activity of the muscle was measured using ELISA kits and serum MDA levels using Tobartic acid (TBARS method. Data were analyzed using one-way ANOVA (ANOVA.   Results: The antioxidant enzyme activity of SOD in the endometrial muscle of endurance group (1.08 ± 0.222 μg / ml was significantly lower than control group (22.2 ± 0.481 kg (P = 0.043, and SOD activity in the endurance + resistance group (1.87 ± 0.172, p = 0.44, endurance + curcumin (2.24 ± 0.222; P = 0.039, and endurance + curcumin + resistance (0.202 ± 0.15, p = 0.029 was significantly higher than endurance group. The levels of malondialdehyde in the endurance group (4.27 ± 0.438 nmol / ml protein were significantly higher in comparison with the control group (3.42 ± 0.350 (0.331 and Also, serum MDA levels in endurance + resistance groups (± 3.03 ± 0.342, p = 0.003, endurance + curcumin (p = 0.001, p <0.001, and endurance + curcumin

  13. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  14. Artificial Intelligence: An Analysis of Potential Applications to Training, Performance Measurement, and Job Performance Aiding. Interim Report for Period September 1982-July 1983.

    Science.gov (United States)

    Richardson, J. Jeffrey

    This paper is part of an Air Force planning effort to develop a research, development, and applications program for the use of artificial intelligence (AI) technology in three target areas: training, performance measurement, and job performance aiding. The paper is organized in five sections that (1) introduce the reader to AI and those subfields…

  15. Prioritizing sleep for healthy work schedules

    OpenAIRE

    Takahashi Masaya

    2012-01-01

    Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amoun...

  16. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  17. Launch team training system

    Science.gov (United States)

    Webb, J. T.

    1988-01-01

    A new approach to the training, certification, recertification, and proficiency maintenance of the Shuttle launch team is proposed. Previous training approaches are first reviewed. Short term program goals include expanding current training methods, improving the existing simulation capability, and scheduling training exercises with the same priority as hardware tests. Long-term goals include developing user requirements which would take advantage of state-of-the-art tools and techniques. Training requirements for the different groups of people to be trained are identified, and future goals are outlined.

  18. The Importance of Muscular Strength: Training Considerations.

    Science.gov (United States)

    Suchomel, Timothy J; Nimphius, Sophia; Bellon, Christopher R; Stone, Michael H

    2018-04-01

    This review covers underlying physiological characteristics and training considerations that may affect muscular strength including improving maximal force expression and time-limited force expression. Strength is underpinned by a combination of morphological and neural factors including muscle cross-sectional area and architecture, musculotendinous stiffness, motor unit recruitment, rate coding, motor unit synchronization, and neuromuscular inhibition. Although single- and multi-targeted block periodization models may produce the greatest strength-power benefits, concepts within each model must be considered within the limitations of the sport, athletes, and schedules. Bilateral training, eccentric training and accentuated eccentric loading, and variable resistance training may produce the greatest comprehensive strength adaptations. Bodyweight exercise, isolation exercises, plyometric exercise, unilateral exercise, and kettlebell training may be limited in their potential to improve maximal strength but are still relevant to strength development by challenging time-limited force expression and differentially challenging motor demands. Training to failure may not be necessary to improve maximum muscular strength and is likely not necessary for maximum gains in strength. Indeed, programming that combines heavy and light loads may improve strength and underpin other strength-power characteristics. Multiple sets appear to produce superior training benefits compared to single sets; however, an athlete's training status and the dose-response relationship must be considered. While 2- to 5-min interset rest intervals may produce the greatest strength-power benefits, rest interval length may vary based an athlete's training age, fiber type, and genetics. Weaker athletes should focus on developing strength before emphasizing power-type training. Stronger athletes may begin to emphasize power-type training while maintaining/improving their strength. Future research should

  19. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  20. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  1. 基于牵引仿真的列车运行图软冲突疏解方法研究%Research on Train Scheduling for High-speed Railway Lines Based on Soft Conflict Adjustment

    Institute of Scientific and Technical Information of China (English)

    唐金金; 周磊山; 冉锋; 陈来成

    2012-01-01

    The soft conflict occurring between running lines in the high-speed train diagram to make trains unable to run at the appropriate power was defined, which was found hard to solve the soft conflict problems with the existing methods of formulating the train diagram. The mechanism and influence of forming soft conflicts between high-speed train running lines were analyzed. It was demonstrated that the method of integrated simulation of traction power supply and train group operation could better solve the soft conflict problems?namely, traction power supply calculations were used to detect soft conflicts of the train diagram and on this basis train operation simulation adjustment was made to get rid of the soft conflicts . The proposed method proves effective in rejecting soft conflicts of the train diagram, provides the control strategy of the train operation process , and solves some difficult problems in simulation calculation of AC traction power supply. Finally a train diagram was formulated and based on adjustment of soft conflicts for a real high-speed railway line in China.%定义存在于高速铁路列车运行图运行线间的使列车无法在适当功率下运行的软冲突问题,该问题使用既有列车运行图规划方法难以有效解决.分析软冲突形成的机理及其影响,论证牵引供电与列车群一体化仿真计算方法能较好解决软冲突问题,即利用牵引供电计算实现列车运行图软冲突的检测,基于该检测结果进行列车仿真运行调整,从而实现对软冲突的剔除.一体化仿真方法不仅能实现高速列车运行图软冲突的疏解,同时也能得出列车运行过程的操纵策略,并解决了交流牵引供电仿真计算中的某些难点问题.选用我国某一高速铁路线路为例,验证基于牵引仿真的列车运行图软冲突疏解方法.

  2. ATD-2 Surface Scheduling and Metering Concept

    Science.gov (United States)

    Coppenbarger, Richard A.; Jung, Yoon Chul; Capps, Richard Alan; Engelland, Shawn A.

    2017-01-01

    This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

  3. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  4. 5 CFR 724.203 - Training obligations.

    Science.gov (United States)

    2010-01-01

    ...) Each agency must develop a written plan to train all of its employees (including supervisors and... materials and method of its training plan. Each agency training plan shall describe: (1) The instructional materials and method of the training, (2) The training schedule, and (3) The means of documenting completion...

  5. Freight railway operator timetabling and engine scheduling

    DEFF Research Database (Denmark)

    Bach, Lukas; Gendreau, M.; Wøhlk, Sanne

    2015-01-01

    In this paper we consider timetable design at a European freight railway operator. The timetable is designed by choosing the time of service for customer unit train demands among a set of discrete points. These discrete points are all found within the a time-window. The objective of the model...... is to minimize cost while adhering to constraints regarding infrastructure usage, demand coverage, and engine availability. The model is solved by a column generation scheme where feasible engine schedules are designed in a label setting algorithm with time-dependent cost and service times....

  6. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  7. A hybrid online scheduling mechanism with revision and progressive techniques for autonomous Earth observation satellite

    Science.gov (United States)

    Li, Guoliang; Xing, Lining; Chen, Yingwu

    2017-11-01

    The autonomicity of self-scheduling on Earth observation satellite and the increasing scale of satellite network attract much attention from researchers in the last decades. In reality, the limited onboard computational resource presents challenge for the online scheduling algorithm. This study considered online scheduling problem for a single autonomous Earth observation satellite within satellite network environment. It especially addressed that the urgent tasks arrive stochastically during the scheduling horizon. We described the problem and proposed a hybrid online scheduling mechanism with revision and progressive techniques to solve this problem. The mechanism includes two decision policies, a when-to-schedule policy combining periodic scheduling and critical cumulative number-based event-driven rescheduling, and a how-to-schedule policy combining progressive and revision approaches to accommodate two categories of task: normal tasks and urgent tasks. Thus, we developed two heuristic (re)scheduling algorithms and compared them with other generally used techniques. Computational experiments indicated that the into-scheduling percentage of urgent tasks in the proposed mechanism is much higher than that in periodic scheduling mechanism, and the specific performance is highly dependent on some mechanism-relevant and task-relevant factors. For the online scheduling, the modified weighted shortest imaging time first and dynamic profit system benefit heuristics outperformed the others on total profit and the percentage of successfully scheduled urgent tasks.

  8. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  9. Comparison of The Effects of A Positive Reappraisal Coping Intervention and Problem-Solving Skills Training on Depression during The Waiting Period of The Result of Intrauterine Insemination Treatment: A Randomized Control Trial.

    Science.gov (United States)

    Ghasemi Gojani, Marzieh; Kordi, Masoumeh; Asgharipour, Negar; Esmaeili, Habibollah

    2018-04-01

    The outcomes of fertility treatments are unpredictable, and levels of depressive symptoms increase in patients during the waiting period of the result of intrauterine insemination (IUI) treatment. The aim of this study was to compare the effects of a positive reappraisal coping intervention (PRCI) and problem-solving skills training (PSS) on depression during the waiting period of the result of IUI Treatment. This randomized control clinical trial was done among 108 women undergoing IUI treatment. In the control group, the women received routine care. In the PRCI group, women attended two training sessions and were asked to complete coping thoughts cards and fill out daily monitoring forms during the waiting period. In the PSS group, PSS were taught over three sessions. The depression was measured by the beck depression inventory. On the 10 th th day of the IUI waiting period, there were significant differences between the control group (21.42 ± 11.42) and the PSS group (12.52 ± 8.05) and PRCI groups (13.14 ± 9.7) (P<0.001), but no significant difference between the PRCI group and the PSS group. According to the results of this randomized control trial there is no difference between a PRCI and PSS on depression during the waiting period of the result of IUI treatment. This suggests that both interventions can be used to help infertile women combat depression during the waiting period of the result of fertility treatments (Registration number: IRCT2016020926490N1). Copyright© by Royan Institute. All rights reserved.

  10. Comparison of The Effects of A Positive Reappraisal Coping Intervention and Problem-Solving Skills Training on Depression during The Waiting Period of The Result of Intrauterine Insemination Treatment: A Randomized Control Trial

    Directory of Open Access Journals (Sweden)

    Marzieh Ghasemi gojani, , ,

    2018-01-01

    Full Text Available Background The outcomes of fertility treatments are unpredictable, and levels of depressive symptoms increase in patients during the waiting period of the result of intrauterine insemination (IUI treatment. The aim of this study was to compare the effects of a positive reappraisal coping intervention (PRCI and problem-solving skills training (PSS on depression during the waiting period of the result of IUI Treatment. Materials and Methods This randomized control clinical trial was done among 108 women undergoing IUI treat- ment. In the control group, the women received routine care. In the PRCI group, women attended two training sessions and were asked to complete coping thoughts cards and fill out daily monitoring forms during the waiting period. In the PSS group, PSS were taught over three sessions. The depression was measured by the beck depression inventory. Results On the 10th day of the IUI waiting period, there were significant differences between the control group (21.42 ± 11.42 and the PSS group (12.52 ± 8.05 and PRCI groups (13.14 ± 9.7 (P<0.001, but no significant difference between the PRCI group and the PSS group. Conclusion According to the results of this randomized control trial there is no difference between a PRCI and PSS on depression during the waiting period of the result of IUI treatment. This suggests that both interventions can be used to help infertile women combat depression during the waiting period of the result of fertility treatments (Registration number: IRCT2016020926490N1.

  11. Astronaut Neil Armstrong participates in simulation training

    Science.gov (United States)

    1969-01-01

    Astronaut Neil A. Armstrong, Apollo 11 commander, participates in simulation training in preparation for the scheduled lunar landing mission. He is in the Apollo Lunar Module Mission SImulator in the Kennedy Space Center's Flight Crew Training Building.

  12. 49 CFR 236.588 - Periodic test.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Periodic test. 236.588 Section 236.588..., Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.588 Periodic test. Except as provided in § 236.586, periodic test of the automatic train stop, train control, or cab signal apparatus...

  13. Training Modalities to Increase Sensorimotor Adaptability

    Science.gov (United States)

    Bloomberg, J. J.; Mulavara, A. P.; Peters, B. T.; Brady, R.; Audas, C.; Cohen, H. S.

    2009-01-01

    During the acute phase of adaptation to novel gravitational environments, sensorimotor disturbances have the potential to disrupt the ability of astronauts to perform required mission tasks. The goal of our current series of studies is develop a sensorimotor adaptability (SA) training program designed to facilitate recovery of functional capabilities when astronauts transition to different gravitational environments. The project has conducted a series of studies investigating the efficacy of treadmill training combined with a variety of sensory challenges (incongruent visual input, support surface instability) designed to increase adaptability. SA training using a treadmill combined with exposure to altered visual input was effective in producing increased adaptability in a more complex over-ground ambulatory task on an obstacle course. This confirms that for a complex task like walking, treadmill training contains enough of the critical features of overground walking to be an effective training modality. SA training can be optimized by using a periodized training schedule. Test sessions that each contain short-duration exposures to multiple perturbation stimuli allows subjects to acquire a greater ability to rapidly reorganize appropriate response strategies when encountering a novel sensory environment. Using a treadmill mounted on top of a six degree-of-freedom motion base platform we investigated locomotor training responses produced by subjects introduced to a dynamic walking surface combined with alterations in visual flow. Subjects who received this training had improved locomotor performance and faster reaction times when exposed to the novel sensory stimuli compared to control subjects. Results also demonstrate that individual sensory biases (i.e. increased visual dependency) can predict adaptive responses to novel sensory environments suggesting that individual training prescription can be developed to enhance adaptability. These data indicate that SA

  14. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  15. Prioritizing sleep for healthy work schedules

    Science.gov (United States)

    2012-01-01

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules. PMID:22738292

  16. Prioritizing sleep for healthy work schedules

    Directory of Open Access Journals (Sweden)

    Takahashi Masaya

    2012-03-01

    Full Text Available Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work. Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  17. Prioritizing sleep for healthy work schedules.

    Science.gov (United States)

    Takahashi, Masaya

    2012-03-13

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  18. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  19. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  20. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  1. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  2. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  3. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  4. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  5. 76 FR 71079 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-11-16

    ... including documentation on ethics training and guidance received by staff. 25. Social Security... year Federal agencies create billions of records on paper, film, magnetic tape, and other media. To... include records proposed as permanent. The schedules listed in this notice are media neutral unless...

  6. 77 FR 70835 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-11-27

    ... what happens to records when no longer needed for current Government business. They authorize the... them to conduct its business. Some schedules are comprehensive and cover all the records of an agency...-0478-2012-0002, 2 items, 2 temporary items). Training manuals, syllabi, textbooks, and other materials...

  7. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  8. Scheduling strategies for cycle scavenging in multicluster grid systems

    NARCIS (Netherlands)

    Sonmez, O.O.; Grundeken, B.; Mohamed, H.H.; Iosup, A.; Epema, D.H.J.

    2009-01-01

    The use of today's multicluster grids exhibits periods of submission bursts with periods of normal use and even of idleness. To avoid resource contention, many users employ observational scheduling, that is, they postpone the submission of relatively low-priority jobs until a cluster becomes

  9. 75 FR 28071 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-05-19

    ... authorized for disposal or reduce the retention period of records already authorized for disposal. NARA... this accumulation, agency records managers prepare schedules proposing retention periods for records... information concerning evaluations of enlisted personnel. Included are job ratings as well as information...

  10. 77 FR 37443 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-06-21

    ... an electronic information system used to track review action assignments and customer satisfaction... disposal or reduce the retention period of records already authorized for disposal. NARA invites public... accumulation, agency records managers prepare schedules proposing retention periods for records and submit...

  11. Adapting immunisation schedules for children undergoing chemotherapy.

    Science.gov (United States)

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  12. Criteria and procedures for validating biomathematical models of human performance and fatigue : procedures for analysis of work schedules.

    Science.gov (United States)

    2013-01-01

    Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...

  13. Fatigue Risk Management: The Impact of Anesthesiology Residents' Work Schedules on Job Performance and a Review of Potential Countermeasures.

    Science.gov (United States)

    Wong, Lily R; Flynn-Evans, Erin; Ruskin, Keith J

    2018-04-01

    Long duty periods and overnight call shifts impair physicians' performance on measures of vigilance, psychomotor functioning, alertness, and mood. Anesthesiology residents typically work between 64 and 70 hours per week and are often required to work 24 hours or overnight shifts, sometimes taking call every third night. Mitigating the effects of sleep loss, circadian misalignment, and sleep inertia requires an understanding of the relationship among work schedules, fatigue, and job performance. This article reviews the current Accreditation Council for Graduate Medical Education guidelines for resident duty hours, examines how anesthesiologists' work schedules can affect job performance, and discusses the ramifications of overnight and prolonged duty hours on patient safety and resident well-being. We then propose countermeasures that have been implemented to mitigate the effects of fatigue and describe how training programs or practice groups who must work overnight can adapt these strategies for use in a hospital setting. Countermeasures include the use of scheduling interventions, strategic naps, microbreaks, caffeine use during overnight and extended shifts, and the use of bright lights in the clinical setting when possible or personal blue light devices when the room lights must be turned off. Although this review focuses primarily on anesthesiology residents in training, many of the mitigation strategies described here can be used effectively by physicians in practice.

  14. Flexiyear Schedules in Germany.

    Science.gov (United States)

    Teriet, Bernhard

    1982-01-01

    Describes a German experiment whereby fulltime employees can work fewer hours without losing status and parttime employees have more options on allocations of working hours. The process ensures that management can count on enough staff for peak periods and more easily plan ahead. (JOW)

  15. Checklist for Staff Technology Training.

    Science.gov (United States)

    Anderson, Mary Alice

    1997-01-01

    Presents a planning checklist for staff technology training. Includes forming a committee and developing proposals, contacting pertinent people, handling publicity, sending invitations, distributing schedules/registration information, arranging for equipment, purchasing prizes, conducting preliminary checks on equipment and software, ordering…

  16. Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

    Directory of Open Access Journals (Sweden)

    Chun-Cheng Lin

    2014-01-01

    Full Text Available When it comes to nurse shift schedules, it is found that the nursing staff have diverse preferences about shift rotations and days-off. The previous studies only focused on the most preferred work shift and the number of satisfactory days-off of the schedule at the current schedule period but had few discussions on the previous schedule periods and other preference levels for shifts and days-off, which may affect fairness of shift schedules. As a result, this paper proposes a nurse scheduling model based upon integer programming that takes into account constraints of the schedule, different preference ranks towards each shift, and the historical data of previous schedule periods to maximize the satisfaction of all the nursing staff's preferences about the shift schedule. The main contribution of the proposed model is that we consider that the nursing staff’s satisfaction level is affected by multiple preference ranks and their priority ordering to be scheduled, so that the quality of the generated shift schedule is more reasonable. Numerical results show that the planned shifts and days-off are fair and successfully meet the preferences of all the nursing staff.

  17. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  18. [Evaluation of the instruction and the instructors by the students during a clinical training period in a gynecology and obstetrics unit].

    Science.gov (United States)

    Ploteau, S; Winer, N; Barrier, J; Rogez, J-M; Philippe, H-J

    2007-12-01

    The evaluation of an educational system is part of the essential process to get high-quality teaching. We wanted to assess the teaching and the teachers in a gynaecological unit with a view to improve the education of the trainees within a dynamic educational system. It is a prospective study which took place in the gynecology-obstetric unit of the University of Nantes. Thanks to a questionnaire called "Evaluation of the teaching during a gynecologic-obstetric training course", we evaluated the feelings of 21 medical students about their two-month training course. This questionnaire of 27 items is divided in several parts. The first one is about the quality of the teaching, the second about planification, the third about the quality of the learning resources, and the fourth is about the educational quality of each teacher (interaction teacher-student). The fifth one evaluates the perception of this work experience by the student, notably his clinical activity and his personal implication in the unity. There are also some open questions which point out the positive aspects of the teaching but also its failings and the parts that must be improved. We give here the details of the different stages of this assessment from the questionnaire up to the results, mentioning their limits considering the conceptual orientations and the methodological orientations chosen. Analysis of the data was done determining the percentage of agreement and disagreement to a statement of the questionnaire. All the students find the teachings interesting and stimulating, objectives were gone through thoroughly. Courses were well organised. Their integration in the medical team was good. They feel responsible especially when they are on call (88.3%). On the other hand, for a quarter of them, educational supports are not adapted, teaching documents are not clear and adapted to the National Test. Half of them (45%) are not satisfied by the numerical campus which does not facilitate

  19. Successful Implementation of Six Sigma to Schedule Student Staffing for Circulation Service Desks

    Science.gov (United States)

    Jankowski, Janiece

    2013-01-01

    In fall of 2011 the University at Buffalo Libraries circulation department undertook Six Sigma training for the purpose of overhauling its student scheduling process. The department was able to mitigate significant staffing budgetary reductions and resource reallocations and to overcome the unique challenges of scheduling student labor for a…

  20. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  1. Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan

    National Research Council Canada - National Science Library

    York, Michael A

    2008-01-01

    .... This capability is developed through the Fleet Readiness Training Plan (FRTP) where the Navy's carriers are scheduled in staggered 32-month cycles consisting of four phases of progressive readiness levels...

  2. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  3. Virtual reality simulation for the operating room: proficiency-based training as a paradigm shift in surgical skills training.

    Science.gov (United States)

    Gallagher, Anthony G; Ritter, E Matt; Champion, Howard; Higgins, Gerald; Fried, Marvin P; Moses, Gerald; Smith, C Daniel; Satava, Richard M

    2005-02-01

    To inform surgeons about the practical issues to be considered for successful integration of virtual reality simulation into a surgical training program. The learning and practice of minimally invasive surgery (MIS) makes unique demands on surgical training programs. A decade ago Satava proposed virtual reality (VR) surgical simulation as a solution for this problem. Only recently have robust scientific studies supported that vision A review of the surgical education, human-factor, and psychology literature to identify important factors which will impinge on the successful integration of VR training into a surgical training program. VR is more likely to be successful if it is systematically integrated into a well-thought-out education and training program which objectively assesses technical skills improvement proximate to the learning experience. Validated performance metrics should be relevant to the surgical task being trained but in general will require trainees to reach an objectively determined proficiency criterion, based on tightly defined metrics and perform at this level consistently. VR training is more likely to be successful if the training schedule takes place on an interval basis rather than massed into a short period of extensive practice. High-fidelity VR simulations will confer the greatest skills transfer to the in vivo surgical situation, but less expensive VR trainers will also lead to considerably improved skills generalizations. VR for improved performance of MIS is now a reality. However, VR is only a training tool that must be thoughtfully introduced into a surgical training curriculum for it to successfully improve surgical technical skills.

  4. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  5. DLTAP: A Network-efficient Scheduling Method for Distributed Deep Learning Workload in Containerized Cluster Environment

    OpenAIRE

    Qiao Wei; Li Ying; Wu Zhong-Hai

    2017-01-01

    Deep neural networks (DNNs) have recently yielded strong results on a range of applications. Training these DNNs using a cluster of commodity machines is a promising approach since training is time consuming and compute-intensive. Furthermore, putting DNN tasks into containers of clusters would enable broader and easier deployment of DNN-based algorithms. Toward this end, this paper addresses the problem of scheduling DNN tasks in the containerized cluster environment. Efficiently scheduling ...

  6. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  7. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  8. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  9. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  10. Declarative Modeling for Production Order Portfolio Scheduling

    Directory of Open Access Journals (Sweden)

    Banaszak Zbigniew

    2014-12-01

    Full Text Available A declarative framework enabling to determine conditions as well as to develop decision-making software supporting small- and medium-sized enterprises aimed at unique, multi-project-like and mass customized oriented production is discussed. A set of unique production orders grouped into portfolio orders is considered. Operations executed along different production orders share available resources following a mutual exclusion protocol. A unique product or production batch is completed while following a given activity’s network order. The problem concerns scheduling a newly inserted project portfolio subject to constraints imposed by a multi-project environment The answers sought are: Can a given project portfolio specified by its cost and completion time be completed within the assumed time period in a manufacturing system in hand? Which manufacturing system capability guarantees the completion of a given project portfolio ordered under assumed cost and time constraints? The considered problems regard finding a computationally effective approach aimed at simultaneous routing and allocation as well as batching and scheduling of a newly ordered project portfolio subject to constraints imposed by a multi-project environment. The main objective is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multi-project-like and mass customized oriented production scheduling. Multiple illustrative examples are discussed.

  11. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  12. Situação do estágio supervisionado em IES privadas da grande São Paulo Supervised period of training on the private universities of São Paulo and cities of the region

    Directory of Open Access Journals (Sweden)

    Sheila Aparecida Pereira dos Santos Silva

    2010-09-01

    Full Text Available Com o objetivo de diagnosticar a dinâmica da supervisão dos estágios em cursos de Graduação e Licenciatura em Educação Física após a publicação das Resoluções CNE/CP nº 01 e 02/2002, nº 07/2004 e nº 02/2007 e verificar sua aplicação, foram entrevistados sete docentes universitários, que orientam estágios curriculares em seis Instituições de Ensino Superior (IES privadas da Grande São Paulo. A entrevista, semi-estruturada, contou com sete questões abertas abrangendo a dinâmica dos estágios, carga horária, número de orientadores por aluno orientado, entre outros aspectos. Para o tratamento dos dados, foi utilizada a técnica de análise de conteúdo. Em todas as instituições pesquisadas o estágio é exigido a partir da metade do curso; existiam projetos de pesquisa e extensão que eram validados como horas/estágio e contemplavam uma disciplina destinada aos estágios, à exceção de uma delas. As horas de estágio a cumprir variaram entre 324 a 540 horas. Existiam diferenças significativas em relação ao número de orientandos por orientador, variando de 5 a 200 alunos por orientador. Em apenas uma IES ocorriam discussões sobre os relatórios apresentados. Percebeu-se a inexistência de uniformidade entre as instituições pesquisadas e, em algumas, a ausência de discussões a respeito dos estágios evidencia que as IES pouco se comprometem com a qualidade dessa experiência no processo de formação profissional e que, talvez, normas legais mais específicas sobre número máximo de alunos orientados por orientador pudessem colaborar para que esse problema fosse minimizadoWith the objective to make a diagnosis the dynamics of the supervision of the periods of training in courses of Graduation in Physical Education after the publication of Resolutions CNE/CP nº 01 and 02/2002, nº 07/2004 and nº 02/2007 and to verify its application, had been interviewed seven university professors, who guide curricular

  13. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  14. The impact of periodized core training program on accurate service velocity of male tennis players aged 11-1311-13 yaş arası erkek tenisçilerde periyotlanmış core antrenman programının isabetli servis hızına etkisi

    OpenAIRE

    Sever, Ozan; Kır, Rıdvan; Yaman, Metin

    2017-01-01

    The purpose of this study is to examine the effect of periodized core training program on the serve velocity in male tennis players aged 11-13 years. 24 male nationally ranged (age 11.9±1.63, height 154.4±11.32, weight 43±8.76) participated to the study from a professional tennis club. Pre-post-training - control group design was applied and subjects were randomly assigned to Control Group and Training Group. Training Group participated to the core training program consisted of isometric and ...

  15. A efetividade do treinamento auditivo formal em idosos usuários de próteses auditivas no período de aclimatização Formal auditory training efficiency in elderly during the acclimatization period

    Directory of Open Access Journals (Sweden)

    Elisiane de Crestani Miranda

    2007-12-01

    Full Text Available OBJETIVO: Verificar a efetividade de um programa de treinamento auditivo formal em idosos usuários de próteses auditivas intraaurais no período de aclimatização. MÉTODOS: A amostra foi composta por 18 idosos (idade média: 71, 38 anos, de ambos os sexos, adaptados há uma semana com próteses auditivas intra-aurais binaurais. Os participantes foram randomizados em dois grupos: Grupo Experimental (submetidos ao treinamento auditivo e Grupo Controle (não submetidos ao treinamento auditivo. O Grupo Experimental participou de sete sessões de treinamento auditivo em cabina acústica, uma sessão por semana, com duração de 50 minutos cada. Os procedimentos de avaliação incluíram testes de reconhecimento de fala e questionário de auto-avaliação do handicap auditivo. Estes foram aplicados em duas oportunidades, antes (1ª avaliação e depois (2ª avaliação do treinamento auditivo no Grupo Experimental e na avaliação inicial e final do estudo no Grupo Controle. RESULTADOS: No Grupo Experimental, o Índice de Reconhecimento de Fala e Fala com Ruído Branco foram significantemente melhores após o treinamento auditivo (2ª avaliação. Já o estudo das relações sinal/ruído no teste de reconhecimento de sentenças no ruído revelou uma tendência (p-valor próximo a 0,05 de melhora na avaliação pós-treinamento. Observou-se nos idosos do Grupo Experimental que os resultados obtidos na 2ª avaliação não foram significantemente melhores aos obtidos no Grupo Controle em todos os testes. CONCLUSÃO: Pode-se concluir que um programa de reabilitação aural, incluindo treinamento auditivo formal beneficia os idosos no período de adaptação das próteses auditivas, bem como modifica o comportamento auditivo destes indivíduos.PURPOSE: To investigate the efficiency of a formal auditory training program in hearing aid wearers during the acclimatization period. METHODS: Eighteen subjects (mean age of 71.38 years old, male and female

  16. An Automatic Course Scheduling Approach Using Instructors' Preferences

    Directory of Open Access Journals (Sweden)

    Hossam Faris

    2012-03-01

    Full Text Available University Courses Timetabling problem has been extensively researched in the last decade. Therefore, numerous approaches were proposed to solve UCT problem. This paper proposes a new approach to process a sequence of meetings between instructors, rooms, and students in predefined periods of time with satisfying a set of constraints divided in variety of types. In addition, this paper proposes new representation for courses timetabling and conflict-free for each time slot by mining instructor preferences from previous schedules to avoid undesirable times for instructors. Experiments on different real data showed the approach achieved increased satisfaction degree for each instructor and gives feasible schedule with satisfying all hard constraints in construction operation. The generated schedules have high satisfaction degrees comparing with schedules created manually. The research conducts experiments on collected data gathered from the computer science department and other related departments in Jordan University of Science and Technology- Jordan.

  17. Efficient scheduling request algorithm for opportunistic wireless access

    KAUST Repository

    Nam, Haewoon

    2011-08-01

    An efficient scheduling request algorithm for opportunistic wireless access based on user grouping is proposed in this paper. Similar to the well-known opportunistic splitting algorithm, the proposed algorithm initially adjusts (or lowers) the threshold during a guard period if no user sends a scheduling request. However, if multiple users make requests simultaneously and therefore a collision occurs, the proposed algorithm no longer updates the threshold but narrows down the user search space by splitting the users into multiple groups iteratively, whereas the opportunistic splitting algorithm keeps adjusting the threshold until a single user is found. Since the threshold is only updated when no user sends a request, it is shown that the proposed algorithm significantly alleviates the burden of the signaling for the threshold distribution to the users by the scheduler. More importantly, the proposed algorithm requires a less number of mini-slots to make a user selection given a certain scheduling outage probability. © 2011 IEEE.

  18. Training for hazardous waste workers

    Energy Technology Data Exchange (ETDEWEB)

    Favel, K.

    1990-10-26

    This implementation plan describes the system and provides the information and schedules that are necessary to comply with the Department of Energy (DOE) Albuquerque Operations Office (AL) Memorandum, Reference EPD dated September 11, 1990, Training for Hazardous Waste Workers. The memo establishes the need for identifying employees requiring environmental training, ensuring that the training is received, and meeting documentation and recordkeeping requirements for the training.

  19. Problem Periods

    Science.gov (United States)

    ... ovary syndrome. Read our information on PCOS for teens , and see your doctor if you think you may have PCOS. Major weight loss. Girls who have anorexia will often stop having periods. When to see ...

  20. Verification of reliability and validity of a Japanese version of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Suzuki, Eiko; Kanoya, Yuka; Katsuki, Takeshi; Sato, Chifumi

    2007-07-01

    To verify the reliability and validity of a Japanese version of the Rathus Assertiveness Schedule in novice nurses to contribute to nursing management. An adequate scale is needed to measure the assertiveness and the effect of assertion training for Japanese nurses and to compare them with those in other countries. Rathus Assertiveness Schedule was adapted to Japanese with back-translation and its validity was examined in 989 novice nurses. The Japanese version showed a high coefficient of reliability in a split-half reliability test (r=0.76; PAssertiveness Schedule. The Japanese version of Rathus Assertiveness Schedule was verified.

  1. Gain and exposure scheduling to compensate for photorefractive neural-network weight decay

    Science.gov (United States)

    Goldstein, Adam A.; Petrisor, Gregory C.; Jenkins, B. Keith

    1995-03-01

    A gain and exposure schedule that theoretically eliminates the effect of photorefractive weight decay for the general class of outer-product neural-network learning algorithms (e.g., backpropagation, Widrow-Hoff, perceptron) is presented. This schedule compensates for photorefractive diffraction-efficiency decay by iteratively increasing the spatial-light-modulator transfer function gain and decreasing the weight-update exposure time. Simulation results for the scheduling procedure, as applied to backpropagation learning for the exclusive-OR problem, show improved learning performance compared with results for networks trained without scheduling.

  2. Digestive oncologist in the gastroenterology training curriculum

    Science.gov (United States)

    Mulder, Chris Jacob Johan; Peeters, Marc; Cats, Annemieke; Dahele, Anna; Droste, Jochim Terhaar sive

    2011-01-01

    Until the late 1980s, gastroenterology (GE) was considered a subspecialty of Internal Medicine. Today, GE also incorporates Hepatology. However, Digestive Oncology training is poorly defined in the Hepatogastroenterology (HGE)-curriculum. Therefore, a Digestive Oncology curriculum should be developed and this document might be a starting point for such a curriculum. HGE-specialists are increasingly resisting the paradigm in which they play only a diagnostic and technical role in the management of digestive tumors. We suggest minimum end-points in the standard HGE-curriculum for oncology, and recommend a focus year in the Netherlands for Digestive Oncology in the HGE-curriculum. To produce well-trained digestive oncologists, an advanced Digestive Oncology training program with specific qualifications in Digestive Oncology (2 years) has been developed. The schedule in Belgium includes a period of at least 6 mo to be spent in a medical oncology department. The goal of these programs remains the production of well-trained digestive oncologists. HGE specialists are part of the multidisciplinary oncological teams, and some have been administering chemotherapy in their countries for years. In this article, we provide a road map for the organization of a proper training in Digestive Oncology. We hope that the World Gastroenterology Organisation and other (inter)national societies will support the necessary certifications for this specific training in the HGE-curriculum. PMID:21556128

  3. The Hinton train disaster.

    Science.gov (United States)

    Smiley, A M

    1990-10-01

    In February of 1986 a head-on collision occurred between a freight train and a passenger train in western Canada killing 23 people and causing over $30 million of damage. A Commission of Inquiry appointed by the Canadian government concluded that human error was the major reason for the collision. This report discusses the factors contributing to the human error: mainly poor work-rest schedules, the monotonous nature of the train driving task, insufficient information about train movements, and the inadequate backup systems in case of human error.

  4. Padronização de um protocolo experimental de treinamento periodizado em natação utilizando ratos Wistar Standardization of an experimental periodized training protocol in swimming rats

    Directory of Open Access Journals (Sweden)

    Gustavo Gomes de Araujo

    2010-02-01

    Full Text Available Verificar os efeitos de 12 semanas de treinamento periodizado de natação em ratos sobre os valores de glicogênio muscular (GM e hepático (GH, capacidade aeróbia (LAn e anaeróbia (Tlim e creatina quinase (CK. Foram utilizados 70 ratos da linhagem Wistar com 60 dias, adaptados individualmente ao meio líquido por duas semanas. Os animais foram divididos em grupos: controle (GC, n = 40 e periodizado (GP, n = 30; a intensidade do treinamento foi equivalente ao peso corporal do animal (% do PC. O treinamento (T para o GP foi dividido em períodos preparatório básico (PPB, seis semanas, específico (PPE, 4,5 semanas e polimento (PP, 1,5 semana, tendo como estímulos intensidades leve (4% do PC, moderada (5% do PC, pesada (6% do PC e intensa (13% do PC. Vinte e quatro horas após a adaptação, 10 ratos do GC foram sacrificados e avaliados pelo teste de lactato mínimo para mensuração dos valores de linha de base de GM, GH, CK, LAn e Tlim. Os dez animais restantes do GC e GP foram sacrificados ao final de cada período de T. O treinamento periodizado aumentou a concentração de glicogênio muscular ao final do período de polimento. O glicogênio hepático não se alterou no GC, porém no GP houve redução significativa no início do período específico com elevação no período de polimento. A concentração de CK não se modificou ao final dos PPB, PPE e PP. O LAn reduziu ao longo do período experimental no GC, mas ao final do PP para o GP, o LAn atingiu os mesmos valores do início do treinamento. O Tlim aumentou no PP. Desse modo, pode-se concluir que o treinamento periodizado provocou supercompensação energética ao final da periodização. A capacidade anaeróbia aumentou no PP bem como o LAn, que obteve maiores valores em relação ao GC nesse período.The objective of this study was to verify the swimming training periodization responses on aerobic and anaerobic performance, glycogen concentration in muscle (M and liver (L, and

  5. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  6. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  7. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  8. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  9. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  10. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  11. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  12. [Impact of the Core Training Law on preventive medicine and public health training and other common medical specialties].

    Science.gov (United States)

    Latasa, Pello; Gil-Borrelli, Christian; Aguilera, José Antonio; Reques, Laura; Barreales, Saúl; Ojeda, Elena; Alemán, Guadalupe; Iniesta, Carlos; Gullón, Pedro

    2016-01-01

    The purpose of the Core Training Law (CTL) is to amend specialised medical training to include 24 months of common training. The aim of this study is to assess its potential impact on the Preventive Medicine and Public Health (PM&PH) training programme and other medical specialties. The programmes of the 21 common medical specialties were analysed and the recommended training periods for each specialty collected, before the information was agreed upon by three observers. The training impact was calculated as the percentage of months that should be amended per specialty to adapt to the common training schedule. The Preventive Medicine and Public Health training programme is the specialty most affected by the Core Training Law (100%, 24 months). Intensive medicine (0%, 0 months) and medical oncology (17%, 4 months) is the least affected. The CTL affects the common medical specialties in different ways and requires a complete reorganisation of the activities and competencies of PM&PH professionals. Copyright © 2016 SESPAS. Published by Elsevier Espana. All rights reserved.

  13. Hybrid and dependent task scheduling algorithm for on-board system software

    Institute of Scientific and Technical Information of China (English)

    魏振华; 洪炳熔; 乔永强; 蔡则苏; 彭俊杰

    2003-01-01

    In order to solve the hybrid and dependent task scheduling and critical source allocation problems, atask scheduling algorithm has been developed by first presenting the tasks, and then describing the hybrid anddependent scheduling algorithm and deriving the predictable schedulability condition. The performance of thisagorithm was evaluated through simulation, and it is concluded from the evaluation results that the hybrid taskscheduling subalgorithm based on the comparison factor can be used to solve the problem of aperiodic task beingblocked by periodic task in the traditional operating system for a very long time, which results in poor schedu-ling predictability; and the resource allocation subalgorithm based on schedulability analysis can be used tosolve the problems of critical section conflict, ceiling blocking and priority inversion; and the scheduling algo-rithm is nearest optimal when the abortable critical section is 0.6.

  14. Scheduling home appliances for energy efficient buildings

    DEFF Research Database (Denmark)

    Rossello Busquet, Ana; Kardaras, Georgios; Iversen, Villy Bæk

    2010-01-01

    The number of appliances found in users’ homes is increasing together with electricity consumption of users’ residences. In addition, there is a tendency to consume during the same period leading to demand peaks. During these periods, electricity providers are forced to develop costly methods...... to generate enough power to meet consumers’ requirements. In addition, high demand peaks can lead to electricity shortages or even blackouts in certain areas. In order to avoid demand peaks, users’ appliances should consume electricity in a more distributed way. A new methodology to schedule the usage of home...... appliances is proposed and analyzed. The main concept behind this approach is the aggregation of home appliances into priority classes and the definition of a maximum power consumption threshold, which is not allowed to be exceeded during peak hours. The scenario simulated describes a modern household, where...

  15. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  16. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  17. DLTAP: A Network-efficient Scheduling Method for Distributed Deep Learning Workload in Containerized Cluster Environment

    Directory of Open Access Journals (Sweden)

    Qiao Wei

    2017-01-01

    Full Text Available Deep neural networks (DNNs have recently yielded strong results on a range of applications. Training these DNNs using a cluster of commodity machines is a promising approach since training is time consuming and compute-intensive. Furthermore, putting DNN tasks into containers of clusters would enable broader and easier deployment of DNN-based algorithms. Toward this end, this paper addresses the problem of scheduling DNN tasks in the containerized cluster environment. Efficiently scheduling data-parallel computation jobs like DNN over containerized clusters is critical for job performance, system throughput, and resource utilization. It becomes even more challenging with the complex workloads. We propose a scheduling method called Deep Learning Task Allocation Priority (DLTAP which performs scheduling decisions in a distributed manner, and each of scheduling decisions takes aggregation degree of parameter sever task and worker task into account, in particularly, to reduce cross-node network transmission traffic and, correspondingly, decrease the DNN training time. We evaluate the DLTAP scheduling method using a state-of-the-art distributed DNN training framework on 3 benchmarks. The results show that the proposed method can averagely reduce 12% cross-node network traffic, and decrease the DNN training time even with the cluster of low-end servers.

  18. ECP divisional training: plan 1996

    OpenAIRE

    Storr, Kenneth Mick

    1996-01-01

    The divisional training plan is produced each year at the request of the Joint Training Board (JTB) following a recommendation in the 1991 CERN Training Plan which states that divisions should produce a plan setting out training priorities. This plan presents a review of training activities. a report on ECP progress in implementing the recommendations of the 1995 CERN training plan, a discussion of divisional training objectives, and a summary of training requests generated by the 1996 period...

  19. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  20. Evaluation of distributed practice schedules on retention of a newly acquired surgical skill: a randomized trial.

    Science.gov (United States)

    Mitchell, Erica L; Lee, Dae Y; Sevdalis, Nick; Partsafas, Aaron W; Landry, Gregory J; Liem, Timothy K; Moneta, Gregory L

    2011-01-01

    practice influences new skill acquisition. The aim of this study was to prospectively investigate the impact of practice distribution (weekly vs monthly) on complex motor skill (end-side vascular anastomosis) acquisition and 4-month retention. twenty-four surgical interns were randomly assigned to weekly training for 4 weeks or monthly training for 4 months, with equal total training times. Performance was assessed before training, immediately after training, after the completion of distributed training, and 4 months later. there was no statistical difference in surgical skill acquisition and retention between the weekly and monthly scheduled groups, as measured by procedural checklist scores, global rating scores of operative performance, final product analysis, and overall performance or assessment of operative "competence." distributed practice results in improvement and retention of a newly acquired surgical skill independent of weekly or monthly practice schedules. Flexibility in a surgical skills laboratory curriculum is possible without adversely affecting training. 2011 Elsevier Inc. All rights reserved.

  1. An interpretation of schedule 1 of the Radioactive Substances Act 1993 and related issues

    International Nuclear Information System (INIS)

    Hill, M.; Wakerley, M.W.

    2000-09-01

    Schedule 1 of the UK's Radioactive Substances Act 1993 was originally Schedule 3 of the 1960 Act of the same name. It is possible that different methods are currently being employed to interpret how Schedule 1 should be used. This report provides an interpretation and guidance on this and related issues. It is primarily for technical specialists already familiar with the workings of the Act. This report covers the period 1999/2000

  2. Using Scheduled Ordering to Improve the Performance of Distribution Supply Chains

    OpenAIRE

    Lucy Gongtao Chen; Srinagesh Gavirneni

    2010-01-01

    We study a supply chain with one supplier and many retailers that face exogenous end-customer demands. The supplier and the retailers all try to minimize their own inventory-related costs. In contrast to the retailers' newsvendor-type ordering behavior (under which retailers may place orders freely in every period), we propose two scheduled ordering policies: the scheduled balanced ordering policy (SBOP) and the scheduled synchronized ordering policy (SSOP). Under both the SBOP and SSOP, reta...

  3. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  4. Multimodal processes scheduling in mesh-like network environment

    Directory of Open Access Journals (Sweden)

    Bocewicz Grzegorz

    2015-06-01

    Full Text Available Multimodal processes planning and scheduling play a pivotal role in many different domains including city networks, multimodal transportation systems, computer and telecommunication networks and so on. Multimodal process can be seen as a process partially processed by locally executed cyclic processes. In that context the concept of a Mesh-like Multimodal Transportation Network (MMTN in which several isomorphic subnetworks interact each other via distinguished subsets of common shared intermodal transport interchange facilities (such as a railway station, bus station or bus/tram stop as to provide a variety of demand-responsive passenger transportation services is examined. Consider a mesh-like layout of a passengers transport network equipped with different lines including buses, trams, metro, trains etc. where passenger flows are treated as multimodal processes. The goal is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multimodal transportation processes scheduling encompassing passenger flow itineraries. Then, the main objective is to provide conditions guaranteeing solvability of particular transport lines scheduling, i.e. guaranteeing the right match-up of local cyclic acting bus, tram, metro and train schedules to a given passengers flow itineraries.

  5. 5 CFR 610.121 - Establishment of work schedules.

    Science.gov (United States)

    2010-01-01

    ... out its functions or that costs would be substantially increased, he or she shall provide that— (1) Assignments to tours of duty are scheduled in advance of the administrative workweek over periods of not less... employee's actual work requirements. (2) When the head of an agency knows in advance of an administrative...

  6. 18 CFR 154.313 - Schedules for minor rate changes.

    Science.gov (United States)

    2010-04-01

    ... of the End of the Test Period. (7) Schedule E. Working Capital. Show the various components provided.... Depreciation, Depletion, Amortization and Negative Salvage Expenses. Show, separately, the gas plant depreciation, depletion, amortization, and negative salvage expenses by functional classifications. For each...

  7. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  8. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  9. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  10. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  11. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  12. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  13. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  14. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  15. Video game training and the reward system

    Science.gov (United States)

    Lorenz, Robert C.; Gleich, Tobias; Gallinat, Jürgen; Kühn, Simone

    2015-01-01

    Video games contain elaborate reinforcement and reward schedules that have the potential to maximize motivation. Neuroimaging studies suggest that video games might have an influence on the reward system. However, it is not clear whether reward-related properties represent a precondition, which biases an individual toward playing video games, or if these changes are the result of playing video games. Therefore, we conducted a longitudinal study to explore reward-related functional predictors in relation to video gaming experience as well as functional changes in the brain in response to video game training. Fifty healthy participants were randomly assigned to a video game training (TG) or control group (CG). Before and after training/control period, functional magnetic resonance imaging (fMRI) was conducted using a non-video game related reward task. At pretest, both groups showed strongest activation in ventral striatum (VS) during reward anticipation. At posttest, the TG showed very similar VS activity compared to pretest. In the CG, the VS activity was significantly attenuated. This longitudinal study revealed that video game training may preserve reward responsiveness in the VS in a retest situation over time. We suggest that video games are able to keep striatal responses to reward flexible, a mechanism which might be of critical value for applications such as therapeutic cognitive training. PMID:25698962

  16. Video game training and the reward system.

    Science.gov (United States)

    Lorenz, Robert C; Gleich, Tobias; Gallinat, Jürgen; Kühn, Simone

    2015-01-01

    Video games contain elaborate reinforcement and reward schedules that have the potential to maximize motivation. Neuroimaging studies suggest that video games might have an influence on the reward system. However, it is not clear whether reward-related properties represent a precondition, which biases an individual toward playing video games, or if these changes are the result of playing video games. Therefore, we conducted a longitudinal study to explore reward-related functional predictors in relation to video gaming experience as well as functional changes in the brain in response to video game training. Fifty healthy participants were randomly assigned to a video game training (TG) or control group (CG). Before and after training/control period, functional magnetic resonance imaging (fMRI) was conducted using a non-video game related reward task. At pretest, both groups showed strongest activation in ventral striatum (VS) during reward anticipation. At posttest, the TG showed very similar VS activity compared to pretest. In the CG, the VS activity was significantly attenuated. This longitudinal study revealed that video game training may preserve reward responsiveness in the VS in a retest situation over time. We suggest that video games are able to keep striatal responses to reward flexible, a mechanism which might be of critical value for applications such as therapeutic cognitive training.

  17. Video Game Training and the Reward System

    Directory of Open Access Journals (Sweden)

    Robert C. Lorenz

    2015-02-01

    Full Text Available Video games contain elaborate reinforcement and reward schedules that have the potential to maximize motivation. Neuroimaging studies suggest that video games might have an influence on the reward system. However, it is not clear whether reward-related properties represent a precondition, which biases an individual towards playing video games, or if these changes are the result of playing video games. Therefore, we conducted a longitudinal study to explore reward-related functional predictors in relation to video gaming experience as well as functional changes in the brain in response to video game training.Fifty healthy participants were randomly assigned to a video game training (TG or control group (CG. Before and after training/control period, functional magnetic resonance imaging (fMRI was conducted using a non-video game related reward task.At pretest, both groups showed strongest activation in ventral striatum (VS during reward anticipation. At posttest, the TG showed very similar VS activity compared to pretest. In the CG, the VS activity was significantly attenuated.This longitudinal study revealed that video game training may preserve reward responsiveness in the ventral striatum in a retest situation over time. We suggest that video games are able to keep striatal responses to reward flexible, a mechanism which might be of critical value for applications such as therapeutic cognitive training.

  18. Relationships between Classroom Schedule Types and Performance on the Algebra I Criterion-Referenced Test

    Science.gov (United States)

    Murray, Gregory V.; Moyer-Packenham, Patricia S.

    2014-01-01

    One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…

  19. Using Variable Interval Reinforcement Schedules to Support Students in the Classroom: An Introduction with Illustrative Examples

    Science.gov (United States)

    Hulac, David; Benson, Nicholas; Nesmith, Matthew C.; Wollersheim Shervey, Sarah

    2016-01-01

    When behaviors are reinforced with a variable interval reinforcement schedule, reinforcement is available only after an unknown period of time. These types of reinforcement schedules are most useful for reinforcing slow and steady responding and for differentially reinforcing behaviors that are incompatible with some problematic behaviors. This…

  20. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different applications from the MCSL NOC benchmark suite. We observe that the metaheuristics perform better than the greedy solution. In the special case of all-to-all communication with equal bandwidths...

  1. Relação entre ciclo menstrual e planejamento dos treinos: um estudo de caso - DOI: 10.4025/actascihealthsci.v30i1.4381 The relation between the menstrual cycle and training schedule: a case study - DOI: 10.4025/actascihealthsci.v30i1.4381

    Directory of Open Access Journals (Sweden)

    Carlos Alexandre Molena Fernandes

    2008-07-01

    Full Text Available Este estudo de caso teve como objetivo verificar a relação do treinamento de tênis de campo com o ciclo menstrual em uma atleta com 17 anos de idade. O período de treinamento foi de 16 semanas. As avaliações motoras foram realizadas em dois momentos, no período de ovulação do ciclo menstrual da atleta investigada. Foram analisadas as capacidades motoras específicas ao tênis de campo: velocidade, potência muscular de membros superiores, potência muscular de membros inferiores e agilidade. Os resultados encontrados demonstram que houve melhora considerável em todas as variáveis. Sendo assim, sugere-se que um planejamento orientado, baseado no princípio da individualidade, poderá orientar cargas de treinos, buscando melhores resultados, entretanto são necessárias monitorações, em diferentes períodos do ciclo menstrual com uma população maior, na busca de respostas por demais fatores relacionados com a menstruação e exercício.This case study had as objective to verify the relation between tennis training and the menstrual cycle of a 17-year-old athlete. The training period lasted 16 weeks. Performance tests were carried out in two instances during the ovulation period of the menstrual cycle of the investigated athlete. Motor skills specific to tennis were analyzed: speed, arm muscle strength, leg muscle strength and agility. The results demonstrated a considerable improvement in all variables. Therefore, it is suggested that a guided plan, based of the principle of individuality, will be able to guide training loads and seek better results. However, monitoring is necessary in the different periods of the menstrual cycle, using a larger population sample, in the search for answers to other factors related to menstruation and exercise.

  2. Scheduled meals and scheduled palatable snacks synchronize circadian rhythms: consequences for ingestive behavior.

    Science.gov (United States)

    Escobar, Carolina; Salgado, Roberto; Rodriguez, Katia; Blancas Vázquez, Aurea Susana; Angeles-Castellanos, Manuel; Buijs, Ruud M

    2011-09-26

    Food is a potent time signal for the circadian system and has shown to entrain and override temporal signals transmitted by the biological clock, the suprachiasmatic nucleus, which adjusts mainly to the daily light/dark (LD) alternation. Organisms mostly ingest food in their active period and this permits a correct coordination between the LD and the food elicited time signals with the circadian system. Under conditions when feeding opportunities are shifted to the usual resting/sleep phase, the potent entraining force of food, shifts circadian fluctuations in several tissues, organs, and brain structures toward meal time, resulting a desynchrony within the body and between the organism and the external LD cycle. The daily scheduled access to a palatable snack exerts similar changes specifically to brain areas involved in motivation and reward responses. This review describes the phenomenology of food entrainment and entrainment by a palatable snack. It suggests how scheduled feeding can lead to food addiction and how shifted feeding schedules toward the sleep phase can result in altered ingestive behavior, obesity and disturbed metabolic responses. Copyright © 2011 Elsevier Inc. All rights reserved.

  3. Cleaning Schedule Operations in Heat Exchanger Networks

    Directory of Open Access Journals (Sweden)

    Huda Hairul

    2018-01-01

    Full Text Available Heat exchanger networks have been known to be the essential parts in the chemical industries. Unfortunately, since the performance of heat exchanger can be decreasing in transferring the heat from hot stream into cold stream due to fouling, then cleaning the heat exchanger is needed to restore its initial performance periodically. A process of heating crude oil in a refinery plant was used as a case study. As many as eleven heat exchangers were used to heat crude oil before it was heated by a furnace to the temperature required to the crude unit distillation column. The purpose of this study is to determine the cleaning schedule of heat exchanger on the heat exchanger networks due to the decrease of the overall heat transfer coefficient by various percentage of the design value. A close study on the process of heat exchanger cleaning schedule in heat exchanger networks using the method of decreasing overall heat transfer coefficient as target. The result showed that the higher the fouling value the more often the heat exchanger is cleaned because the overall heat transfer coefficient decreases quickly.

  4. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  5. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  6. Optimal Intermittent Dose Schedules for Chemotherapy Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nadia ALAM

    2013-08-01

    Full Text Available In this paper, a design method for optimal cancer chemotherapy schedules via genetic algorithm (GA is presented. The design targets the key objective of chemotherapy to minimize the size of cancer tumor after a predefined time with keeping toxic side effects in limit. This is a difficult target to achieve using conventional clinical methods due to poor therapeutic indices of existing anti-cancer drugs. Moreover, there are clinical limitations in treatment administration to maintain continuous treatment. Besides, carefully decided rest periods are recommended to for patient’s comfort. Three intermittent drug scheduling schemes are presented in this paper where GA is used to optimize the dose quantities and timings by satisfying several treatment constraints. All three schemes are found to be effective in total elimination of cancer tumor after an agreed treatment length. The number of cancer cells is found zero at the end of the treatment for all three cases with tolerable toxicity. Finally, two of the schemes, “Fixed interval variable dose (FIVD and “Periodic dose” that are periodic in characteristic have been emphasized due to their additional simplicity in administration along with friendliness to patients. responses to the designed treatment schedules. Therefore the proposed design method is capable of planning effective, simple, patient friendly and acceptable chemotherapy schedules.

  7. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  8. Academic Training: Real Time Process Control - Lecture series

    CERN Multimedia

    Françoise Benz

    2004-01-01

    ACADEMIC TRAINING LECTURE REGULAR PROGRAMME 7, 8 and 9 June From 11:00 hrs to 12:00 hrs - Main Auditorium bldg. 500 Real Time Process Control T. Riesco / CERN-TS What exactly is meant by Real-time? There are several definitions of real-time, most of them contradictory. Unfortunately the topic is controversial, and there does not seem to be 100% agreement over the terminology. Real-time applications are becoming increasingly important in our daily lives and can be found in diverse environments such as the automatic braking system on an automobile, a lottery ticket system, or robotic environmental samplers on a space station. These lectures will introduce concepts and theory like basic concepts timing constraints, task scheduling, periodic server mechanisms, hard and soft real-time.ENSEIGNEMENT ACADEMIQUE ACADEMIC TRAINING Françoise Benz 73127 academic.training@cern.ch

  9. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  10. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  11. Inception report: Training and technology transfer feasibility study for Tenaga Nasional Berhad. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-29

    The study, conducted by General Physics Corporation, was funded by the U.S. Trade and Development Agency. The report recommends strategies and specific actions for Tenaga Nasional Berhad`s training and technology transfer needs. The study covers the assessments made by teams of generation, transmission, distribution, management engineers and training specialists over a 4-month period. The Inception Report is divided into the following sections: (1) Project Objectives; (2) General Physics Background; (3) Project Description; (4) Project Organization; (5) Detailed Scope of Work; (6) Project Schedule; (Appendix A) Personnel Resumes; (Appendix B) General Physics Brochures.

  12. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  13. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  14. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  15. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  16. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  17. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  18. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  19. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  20. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  1. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  2. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  3. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  4. Long range planning, scheduling and budgeting for the environmental compliance program at the Rocky Flats Plant

    International Nuclear Information System (INIS)

    McKinley, K.B.; Nielsen, T.H.

    1989-01-01

    This paper reports how the Rocky Flats RCRA/CERCLA group at the Rocky Flats Plant in Golden, Colorado is developing a computerized schedule and budget management system. The system will aggregate schedule, budgets, and regulatory commitments provided by RCRA/CERCLA program managers. The system will provide tabular and graphical representations of the schedule and budget information at various levels of detail. The system will perform a variety of analyses on the schedule and budget. The RCRA/CERCLA group will use the results to develop realistic compliance schedules and the budgets necessary to meet them. Presentation of the schedules and budgets in a consistent graphical and tabular form will give a good appreciation of the remediation costs as understood by the RCRA/CERCLA group. The system will then be used to test resource availability and remediation period scenarios, differing from the optimal combination as determined by the RCRA/CERCLA group

  5. Using Activity Schedules to Increase On-Task Behavior in Children at Risk for Attention-Deficit/Hyperactivity Disorder

    Science.gov (United States)

    Cirelli, Christe A.; Sidener, Tina M.; Reeve, Kenneth F.; Reeve, Sharon A.

    2016-01-01

    The effects of activity schedules on on-task and on-schedule behavior were assessed with two boys at risk for attention-deficit/hyperactivity disorder (ADHD) and referred by their public school teachers as having difficulty during independent work time. On-task behavior increased for both participants after two training sessions. Teachers, peers,…

  6. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  7. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  8. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  9. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  10. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  11. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  12. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  13. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  14. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  15. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  16. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  17. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  18. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  19. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  20. Stages of Toilet Training: Different Skills, Different Schedules

    Science.gov (United States)

    ... germs, the potential for mess, the attached cultural stigma, and so on. On the contrary, toddlers and ... in an overemotional way. Instead, calmly ask your child why he is behaving in this way, firmly ...

  1. Design Evolution of a Fighter Training Scheduling Decision Support System.

    Science.gov (United States)

    1987-03-01

    student class, date and time of the academic meeting, and the instructor as- signed to teach . Injuts/Dutieg-Meetingn. This screen must display the numerous...34Class Timeline* from the MAIN MENU. Allmgor.. Aids: The class names art depicted along the left side of the graph. Coto Mechanizmma: The EFl ...drives are inside the computer as actual "hard’ware, hence the name. K-5 Instructor Pilo (1k) An Instructor Pilot is a pilot that is qualified to teach

  2. ENHANCED HYBRID PSO – ACO ALGORITHM FOR GRID SCHEDULING

    Directory of Open Access Journals (Sweden)

    P. Mathiyalagan

    2010-07-01

    Full Text Available Grid computing is a high performance computing environment to solve larger scale computational demands. Grid computing contains resource management, task scheduling, security problems, information management and so on. Task scheduling is a fundamental issue in achieving high performance in grid computing systems. A computational GRID is typically heterogeneous in the sense that it combines clusters of varying sizes, and different clusters typically contains processing elements with different level of performance. In this, heuristic approaches based on particle swarm optimization and ant colony optimization algorithms are adopted for solving task scheduling problems in grid environment. Particle Swarm Optimization (PSO is one of the latest evolutionary optimization techniques by nature. It has the better ability of global searching and has been successfully applied to many areas such as, neural network training etc. Due to the linear decreasing of inertia weight in PSO the convergence rate becomes faster, which leads to the minimal makespan time when used for scheduling. To make the convergence rate faster, the PSO algorithm is improved by modifying the inertia parameter, such that it produces better performance and gives an optimized result. The ACO algorithm is improved by modifying the pheromone updating rule. ACO algorithm is hybridized with PSO algorithm for efficient result and better convergence in PSO algorithm.

  3. Training and information

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Training and Information Division provides centralized direction and coordination for the training and information activities of the Center for Energy and Environment Research (formerly Puerto Rico Nuclear Center). The Division Head serves as Educational Officer, Technical Information Officer, and Public Information Officer. Training responsibilities include registering students; maintaining centralized records on training activities; preparing reports for ERDA; scheduling the utilization of training facilities; providing audiovisual equipment; assisting in the preparation of courses, seminars, symposia, and meetings; administering fellowship programs; and providing personal assistance to students in matters such as housing and immigration. The Division Head represents the Director on the Admissions Committee. Information responsibilities include preparation of manuscripts for ERDA patent clearance and publication release, maintenance of central files on all manuscripts and publications, preparation of the Annual Report, providing editorial and translation assistance, operation of a Technical Reading Room, operation of an ERDA Film Library, operation of a Reproduction Shop, providing copying services, and assisting visitors

  4. Bilevel Fuzzy Chance Constrained Hospital Outpatient Appointment Scheduling Model

    Directory of Open Access Journals (Sweden)

    Xiaoyang Zhou

    2016-01-01

    Full Text Available Hospital outpatient departments operate by selling fixed period appointments for different treatments. The challenge being faced is to improve profit by determining the mix of full time and part time doctors and allocating appointments (which involves scheduling a combination of doctors, patients, and treatments to a time period in a department optimally. In this paper, a bilevel fuzzy chance constrained model is developed to solve the hospital outpatient appointment scheduling problem based on revenue management. In the model, the hospital, the leader in the hierarchy, decides the mix of the hired full time and part time doctors to maximize the total profit; each department, the follower in the hierarchy, makes the decision of the appointment scheduling to maximize its own profit while simultaneously minimizing surplus capacity. Doctor wage and demand are considered as fuzzy variables to better describe the real-life situation. Then we use chance operator to handle the model with fuzzy parameters and equivalently transform the appointment scheduling model into a crisp model. Moreover, interactive algorithm based on satisfaction is employed to convert the bilevel programming into a single level programming, in order to make it solvable. Finally, the numerical experiments were executed to demonstrate the efficiency and effectiveness of the proposed approaches.

  5. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  6. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  7. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  8. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  9. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  10. Comparison of between-training-sessions recovery strategies for world-class BMX pilots.

    Science.gov (United States)

    Marquet, Laurie-Anne; Hausswirth, Christophe; Hays, Arnaud; Vettoretti, Fabrice; Brisswalter, Jeanick

    2015-03-01

    To assess the impact of between-training-sessions recovery strategies (passive [PAS], active [ACT], cold-water immersion [CWI], and ingestion of a recovery drink [NUTR]) on maximal cycling performance, perceptions of delayed-onset muscle soreness (DOMS), and fatigue in world-class BMX riders. Eleven elite BMX athletes, members of the French national team (top country in the 2011 international ranking, 4 medals at the 2012 World Championships, top European country), participated in the study, which involved standardized training periods. Athletes performed 3 maximal-sprint power tests: the first day of the week before the training session and before and after training on the third day of the week (D3). The recovery strategy was randomly assigned to each participant on day 2 immediately after the last training period of the day. Perceptions of DOMS and general fatigue were recorded on D3. After training on D3, the decrease in maximal-sprint power (Pmax) was significantly greater for PAS than with CWI (P=.02) and NUTR (P=.018). Similar results were found with ACT (vs CWI P=.044, and vs NUTR P=.042). Self-reported DOMS and fatigue were significantly greater after PAS than after other strategies. For elite BMX riders, between training days, nutritional and/or CWI recovery strategies appear to be best for reducing muscle fatigue and increasing the capacity to withstand the training schedule.

  11. Training of radwaste management specialists

    International Nuclear Information System (INIS)

    Lifanova, S.D.

    2010-01-01

    Highly professional and knowledgeable employees for chemical, and especially radiochemical, technology companies are very much sought after these days. Taking into account the advancement of nuclear power and the associated expansion of radioactive waste management facilities, the demand for staff that possesses all the necessary knowledge is set to increase multi-tenfold. In such circumstances, training of personnel is becoming a key element of the human resource management process. The author says that training of personnel at SUE SIA Radon Moscow is conducted in accordance with the Program of Training, Advanced Training and Personnel Qualification, which prescribes areas of training, categories of trainees, approximate number of trainees for each area, schedule and budget of training sessions. The cooperation of SUE SIA Radon Moscow with higher-education institutions in the field of young specialists training and advanced training of managerial, technical and administrative staff is reported [ru

  12. Voltage scheduling for low power/energy

    Science.gov (United States)

    Manzak, Ali

    2001-07-01

    Power considerations have become an increasingly dominant factor in the design of both portable and desk-top systems. An effective way to reduce power consumption is to lower the supply voltage since voltage is quadratically related to power. This dissertation considers the problem of lowering the supply voltage at (i) the system level and at (ii) the behavioral level. At the system level, the voltage of the variable voltage processor is dynamically changed with the work load. Processors with limited sized buffers as well as those with very large buffers are considered. Given the task arrival times, deadline times, execution times, periods and switching activities, task scheduling algorithms that minimize energy or peak power are developed for the processors equipped with very large buffers. A relation between the operating voltages of the tasks for minimum energy/power is determined using the Lagrange multiplier method, and an iterative algorithm that utilizes this relation is developed. Experimental results show that the voltage assignment obtained by the proposed algorithm is very close (0.1% error) to that of the optimal energy assignment and the optimal peak power (1% error) assignment. Next, on-line and off-fine minimum energy task scheduling algorithms are developed for processors with limited sized buffers. These algorithms have polynomial time complexity and present optimal (off-line) and close-to-optimal (on-line) solutions. A procedure to calculate the minimum buffer size given information about the size of the task (maximum, minimum), execution time (best case, worst case) and deadlines is also presented. At the behavioral level, resources operating at multiple voltages are used to minimize power while maintaining the throughput. Such a scheme has the advantage of allowing modules on the critical paths to be assigned to the highest voltage levels (thus meeting the required timing constraints) while allowing modules on non-critical paths to be assigned

  13. Case study: Accelerated schedule for MULTI LIMS installation

    International Nuclear Information System (INIS)

    Ibsen, T.G.

    1994-05-01

    This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff

  14. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  15. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  17. Periodical Cicada--Brood V (Pest Alert)

    Science.gov (United States)

    USDA Forest Service

    1999-01-01

    Three separate species of periodical cicadas, Magicicada septendecim (L.), M. cassini (Fisher), and M. septendecula (Alexander and Moore), will appear this spring over large portions of Ohio and West Virginia during the scheduled Brood V emergence. This brood is the largest that occurs in either state and was last seen in 1982. It will also emerge in the southwest...

  18. 20 CFR 628.420 - Job training plan.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job training plan. 628.420 Section 628.420... THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.420 Job training plan. (a) The Governor shall issue instructions and schedules to assure that job training plans and plan modifications...

  19. 28 CFR 345.83 - Job safety training.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Job safety training. 345.83 Section 345... INDUSTRIES (FPI) INMATE WORK PROGRAMS FPI Inmate Training and Scholarship Programs § 345.83 Job safety training. FPI provides inmates with regular job safety training which is developed and scheduled in...

  20. Formulation for less master production schedule instability under rolling horizon

    OpenAIRE

    Herrera , Carlos; Thomas , André

    2009-01-01

    International audience; In Manufacturing Planning and Control Systems, the Master Production Schedule (MPS) makes a link between tactical and operational levels, taking into account information provided by end items, demand forecast as well as Sales and Operations Planning (S&OP) suggestions. Therefore, MPS plays an important role to maintain an adequate customers service level and an efficient production system. In a rolling planning horizon, MPS is periodically computed over whole operation...

  1. Taking the lag out of jet lag through model-based schedule design.

    Science.gov (United States)

    Dean, Dennis A; Forger, Daniel B; Klerman, Elizabeth B

    2009-06-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  2. Taking the lag out of jet lag through model-based schedule design.

    Directory of Open Access Journals (Sweden)

    Dennis A Dean

    2009-06-01

    Full Text Available Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  3. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  4. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  5. MODALITIES OF TRAINING PARAMETER ALTERNATION IN NOWADAYS STRENGTH TRAINING PRACTICE

    Directory of Open Access Journals (Sweden)

    RANISAVLJEV IGOR

    2010-12-01

    Full Text Available Large number of variables could be alternated during the process of planning and programming in sports training. Superior training results in majority of sports are achieved by optimally manipulating training parameters in appropriate sequences and combinations. Additionally, in some sports they might be the result of appropriate periodization pattern. Today's tendency in strength training practice is training movements instead of training muscles. Exercise classification according to the dominant movement types, allows creating new modalities in training alternation. Additional variations in volume, intensity, rest brakes, repetition velocity andinter-repetition rest can be the important part of functional strength training program. Alternation and combination of different training parameters makes appropriate training stimulus for strength increase in the most of nowadays sports. Optimal alternation of basic training parameters should be the first part in the processof planning and programming. As a result, majority of athletes might not need advanced periodization patterns for optimal improvement in muscle strength and power

  6. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  7. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  8. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  9. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  10. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  11. Training community mental health staff in Guangzhou, China: evaluation of the effect of a new training model.

    Science.gov (United States)

    Li, Jie; Li, Juan; Thornicroft, Graham; Yang, Hui; Chen, Wen; Huang, Yuanguang

    2015-10-26

    Increasing numbers of people with mental disorders receive services at primary care in China. The aims of this study are to evaluate impact of a new training course and supervision for community mental health staff to enhance their levels of mental health knowledge and to reduce their stigmatization toward people with mental illness. A total of 77 community mental health staff from eight regions in Guangzhou in China were recruited for the study.4 regions were randomly allocated to the new training model group, and 4 to the old training model group. Levels of mental health knowledge were measured by purpose-made assessment schedule and by the Mental Health Knowledge Schedule (MAKS). Stigma was evaluated by the Mental Illness: Clinicians' Attitudes Scale (MICA) and the Reported and Intended Behavior Scale (RIBS). Evaluation questionnaires were given at the beginning of course, at the end, and at 6 month and at 12 month follow-up. After the training period, the 6-month, and the 12-month, knowledge scores of the intervention group were higher than the control group. At 6-month and 12-month follow-up, means scores of MAKS of the intervention group increased more than the control group (both p training, at 6-months, and at 12-months, mean scores of RIBS of the intervention group increased more than the control (p training course and supervision, the new course improved community mental health staff knowledge of mental disorders, improving their attitudes toward people with mental disorder, and increasing their willingness to have contact with people with mental disorder.

  12. A review of metaheuristic scheduling techniques in cloud computing

    Directory of Open Access Journals (Sweden)

    Mala Kalra

    2015-11-01

    Full Text Available Cloud computing has become a buzzword in the area of high performance distributed computing as it provides on-demand access to shared pool of resources over Internet in a self-service, dynamically scalable and metered manner. Cloud computing is still in its infancy, so to reap its full benefits, much research is required across a broad array of topics. One of the important research issues which need to be focused for its efficient performance is scheduling. The goal of scheduling is to map tasks to appropriate resources that optimize one or more objectives. Scheduling in cloud computing belongs to a category of problems known as NP-hard problem due to large solution space and thus it takes a long time to find an optimal solution. There are no algorithms which may produce optimal solution within polynomial time to solve these problems. In cloud environment, it is preferable to find suboptimal solution, but in short period of time. Metaheuristic based techniques have been proved to achieve near optimal solutions within reasonable time for such problems. In this paper, we provide an extensive survey and comparative analysis of various scheduling algorithms for cloud and grid environments based on three popular metaheuristic techniques: Ant Colony Optimization (ACO, Genetic Algorithm (GA and Particle Swarm Optimization (PSO, and two novel techniques: League Championship Algorithm (LCA and BAT algorithm.

  13. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  14. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  15. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  16. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  17. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  18. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  19. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  20. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  1. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  2. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  3. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  4. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  5. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  6. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  7. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  8. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  9. The ACR: Advanced design features for a short construction schedule

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.

    2003-01-01

    Building on the successful CANDU construction at Qinshan, the ACR-700 is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. A project schedule of 48 months has been developed for the nth ACR unit with a 36 months construction period from First Concrete to Fuel Load. This paper describes some of the advanced design features implemented in the reactor building design in order to achieve this short construction period. These features include large volume concrete pours, prefabricated rebar, composite structures, prefabricated permanent formwork and significant modularization and prefabrication

  10. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  11. Different MK-801 administration schedules induce mild to severe learning impairments in an operant conditioning task: role of buspirone and risperidone in ameliorating these cognitive deficits.

    Science.gov (United States)

    Rapanelli, Maximiliano; Frick, Luciana Romina; Bernardez-Vidal, Micaela; Zanutto, Bonifacio Silvano

    2013-11-15

    Blockade of N-methyl-d-aspartate receptor (NMDA) by the noncompetitive NMDA receptor (NMDAR) antagonist MK-801 produces behavioral abnormalities and alterations in prefrontal cortex (PFC) functioning. Due to the critical role of the PFC in operant conditioning task learning, we evaluated the effects of acute, repeated postnatal injections of MK-801 (0.1mg/kg) on learning performance. We injected Long-Evans rats i.p. with MK-801 (0.1mg/kg) using three different administration schedules: injection 40 min before beginning the task (during) (n=12); injection twice daily for six consecutive days prior to beginning the experimental procedures (prior) (n=12); or twice daily subcutaneous injections from postnatal day 7 to 11 (postnatal) (n=12). Next, we orally administered risperidone (serotonin receptor 2A and dopamine receptor 2 antagonist, 1mg/kg) or buspirone (serotonin receptor 1A partial agonist, 10mg/kg) to animals treated with the MK-801 schedule described above. The postnatal and prior administration schedules produced severe learning deficits, whereas injection of MK-801 just before training sessions had only mild effects on acquisition of an operant conditioning. Risperidone was able to reverse the detrimental effect of MK-801 in the animals that were treated with MK-801 during and prior training sessions. In contrast, buspirone was only effective at mitigating the cognitive deficits induced by MK-801 when administered during the training procedures. The data demonstrates that NMDA antagonism disrupts basic mechanisms of learning in a simple PFC-mediated operant conditioning task, and that buspirone and risperidone failed to attenuate the learning deficits when NMDA neurotransmission was blocked in the early stages of the postnatal period. Copyright © 2013 Elsevier B.V. All rights reserved.

  12. An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility

    Directory of Open Access Journals (Sweden)

    Lianfei Yu

    2017-01-01

    Full Text Available Efficient scheduling for the supporting operations of aircrafts in flight deck is critical to the aircraft carrier, and even several seconds’ improvement may lead to totally converse outcome of a battle. In the paper, we ameliorate the supporting operations of carrier-based aircrafts and investigate three simultaneous operation relationships during the supporting process, including precedence constraints, parallel operations, and sequence flexibility. Furthermore, multifunctional aircrafts have to take off synergistically and participate in a combat cooperatively. However, their takeoff order must be restrictively prioritized during the scheduling period accorded by certain operational regulations. To efficiently prioritize the takeoff order while minimizing the total time budget on the whole takeoff duration, we propose a novel mixed integer liner programming formulation (MILP for the flight deck scheduling problem. Motivated by the hardness of MILP, we design an improved differential evolution algorithm combined with typical local search strategies to improve computational efficiency. We numerically compare the performance of our algorithm with the classical genetic algorithm and normal differential evolution algorithm and the results show that our algorithm obtains better scheduling schemes that can meet both the operational relations and the takeoff priority requirements.

  13. Training Accreditation Program

    International Nuclear Information System (INIS)

    1989-01-01

    The cornerstone of safe operation of Department of Energy (DOE) nuclear facilities is personnel performing the day-to-day functions which accomplish the facility mission. Training that is conducted efficiently and effectively and is directly related to the needs of the job (i.e. performance-based training) is fundamental to safe operation. Responsibility for the safe operation of these facilities is a line management function. Therefore, achieving performance-based training requires commitment from the organization for which training is provided. This commitment includes making subject matter experts available for participation in and review of the products of the performance-based training process. It also includes budgeting and scheduling the time required for both initial and continuing training. This commitment must be made by corporate and facility senior management from the beginning. Management must get involved at the start to ensure that they are not only cognizant of ongoing activities, but are also involved to the degree necessary to thoroughly understand the process. Policies implemented and support demonstrated by senior management provide the driving force to ensure that training programs receive the attention that is imperative if facility training programs are to be successful

  14. Basis scheme of personnel training system

    International Nuclear Information System (INIS)

    Rerucha, F.; Odehnal, J.

    1998-01-01

    Basic scheme of the training system for NPP personnel of CEZ-EDU personnel training system is described in detail. This includes: specific training both basic and periodic, and professional training meaning specialized and continuous training. The following schemes are shown: licence acquisition and authorisation for PWR-440 Control Room Personnel; upgrade training for job positions of Control Room personnel; maintaining and refresh training; module training for certificate acquisition of servicing shift and operating personnel

  15. Real-time Energy Resource Scheduling considering a Real Portuguese Scenario

    DEFF Research Database (Denmark)

    Silva, Marco; Sousa, Tiago; Morais, Hugo

    2014-01-01

    The development in power systems and the introduction of decentralized gen eration and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which...... scheduling in smart grids, considering day - ahead, hour - ahead and real - time scheduling. The case study considers a 33 - bus distribution network with high penetration of distributed energy resources . The wind generation profile is base d o n a rea l Portuguese wind farm . Four scenarios are presented...... taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour - ahead and real - time scheduling...

  16. QoS Differentiated and Fair Packet Scheduling in Broadband Wireless Access Networks

    Directory of Open Access Journals (Sweden)

    Zhang Yan

    2009-01-01

    Full Text Available This paper studies the packet scheduling problem in Broadband Wireless Access (BWA networks. The key difficulties of the BWA scheduling problem lie in the high variability of wireless channel capacity and the unknown model of packet arrival process. It is difficult for traditional heuristic scheduling algorithms to handle the situation and guarantee satisfying performance in BWA networks. In this paper, we introduce learning-based approach for a better solution. Specifically, we formulate the packet scheduling problem as an average cost Semi-Markov Decision Process (SMDP. Then, we solve the SMDP by using reinforcement learning. A feature-based linear approximation and the Temporal-Difference learning technique are employed to produce a near optimal solution of the corresponding SMDP problem. The proposed algorithm, called Reinforcement Learning Scheduling (RLS, has in-built capability of self-training. It is able to adaptively and timely regulate its scheduling policy according to the instantaneous network conditions. Simulation results indicate that RLS outperforms two classical scheduling algorithms and simultaneously considers: (i effective QoS differentiation, (ii high bandwidth utilization, and (iii both short-term and long-term fairness.

  17. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  18. Language Training: English Training

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Language Training Françoise Benz tel. 73127 language.training@cern.ch General and Professional English Courses The next session will take place: from 1st March to 25 June 2004 (2 weeks break at Easter). These courses are open to all persons working on the Cern site, and to their spouses. For registration and further information on the courses, please consult our Web pages: http://cern.ch/Training or contact Mr. Liptow: tel. 72957.

  19. Language Training: English Training

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. LANGUAGE TRAINING Françoise Benz tel. 73127 language.training@cern.ch General and Professional English Courses The next session will take place: from 1st March to 25 June 2004 (2 weeks break at Easter). These courses are open to all persons working on the Cern site, and to their spouses. For registration and further information on the courses, please consult our Web pages: http://cern.ch/Training or contact Mr. Liptow: tel. 72957.

  20. Nurse Scheduling by Cooperative GA with Effective Mutation Operator

    Science.gov (United States)

    Ohki, Makoto

    In this paper, we propose an effective mutation operators for Cooperative Genetic Algorithm (CGA) to be applied to a practical Nurse Scheduling Problem (NSP). The nurse scheduling is a very difficult task, because NSP is a complex combinatorial optimizing problem for which many requirements must be considered. In real hospitals, the schedule changes frequently. The changes of the shift schedule yields various problems, for example, a fall in the nursing level. We describe a technique of the reoptimization of the nurse schedule in response to a change. The conventional CGA is superior in ability for local search by means of its crossover operator, but often stagnates at the unfavorable situation because it is inferior to ability for global search. When the optimization stagnates for long generation cycle, a searching point, population in this case, would be caught in a wide local minimum area. To escape such local minimum area, small change in a population should be required. Based on such consideration, we propose a mutation operator activated depending on the optimization speed. When the optimization stagnates, in other words, when the optimization speed decreases, the mutation yields small changes in the population. Then the population is able to escape from a local minimum area by means of the mutation. However, this mutation operator requires two well-defined parameters. This means that user have to consider the value of these parameters carefully. To solve this problem, we propose a periodic mutation operator which has only one parameter to define itself. This simplified mutation operator is effective over a wide range of the parameter value.