WorldWideScience

Sample records for performance assessment monitoring

  1. Assessing the monitoring performance using a synthetic microseismic catalogue for hydraulic fracturing

    Science.gov (United States)

    Ángel López Comino, José; Kriegerowski, Marius; Cesca, Simone; Dahm, Torsten; Mirek, Janusz; Lasocki, Stanislaw

    2016-04-01

    Hydraulic fracturing is considered among the human operations which could induce or trigger seismicity or microseismic activity. The influence of hydraulic fracturing operations is typically expected in terms of weak magnitude events. However, the sensitivity of the rock mass to trigger seismicity varies significantly for different sites and cannot be easily predicted prior to operations. In order to assess the sensitivity of microseismity to hydraulic fracturing operations, we perform a seismic monitoring at a shale gas exploration/exploitation site in the central-western part of the Peribaltic synclise at Pomerania (Poland). The monitoring will be continued before, during and after the termination of hydraulic fracturing operations. The fracking operations are planned in April 2016 at a depth 4000 m. A specific network setup has been installed since summer 2015, including a distributed network of broadband stations and three small-scale arrays. The network covers a region of 60 km2. The aperture of small scale arrays is between 450 and 950 m. So far no fracturing operations have been performed, but seismic data can already be used to assess the seismic noise and background microseismicity, and to investigate and assess the detection performance of our monitoring setup. Here we adopt a recently developed tool to generate a synthetic catalogue and waveform dataset, which realistically account for the expected microseismicity. Synthetic waveforms are generated for a local crustal model, considering a realistic distribution of hypocenters, magnitudes, moment tensors, and source durations. Noise free synthetic seismograms are superposed to real noise traces, to reproduce true monitoring conditions at the different station locations. We estimate the detection probability for different magnitudes, source-receiver distances, and noise conditions. This information is used to estimate the magnitude of completeness at the depth of the hydraulic fracturing horizontal wells

  2. Fiscal Year 2005 Integrated Monitoring Plan for the Hanford Groundwater Performance Assessment Project

    International Nuclear Information System (INIS)

    Rieger, JoAnne T.; Hartman, Mary J.

    2005-01-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various purposes, but sampling is coordinated and data are shared among users. DOE manages these activities through the Hanford Groundwater Performance Assessment Project, which is the responsibility of Pacific Northwest National Laboratory. The groundwater project integrates monitoring for various objectives into a single sampling schedule to avoid redundancy of effort and to improve efficiency of sample collection.This report documents the purposes and objectives of groundwater monitoring at the DOE Hanford Site in southeastern Washington State

  3. Performance Assessment Monitoring Plan for the Hanford Site Low-Level Burial Grounds

    International Nuclear Information System (INIS)

    2006-01-01

    The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal facility for low-level and mixed low-level wastes has been restricted to lined trenches and the Navy reactor-compartment trench only. Hence, as of July 2004, only the two lined trenches in burial ground 218-W-5 (trenches 31 and 34, see Appendix A) and the Navy reactor-compartment trench in burial ground 218 E 12B (trench 94) are allowed to receive waste. When the two lined trenches are filled, the LLBG will cease to operate except for reactor compartment disposal at trench 94. Remaining operational lifetime of the LLBG is dependent on waste volume disposal rates. Existing programs for air sampling and analyses and subsidence monitoring are currently adequate for performance assessment at the LLBG. The waste disposal authorization for the Hanford Site is based (in part) on the post-closure performance assessments for the LLBG. In order to maintain a useful link between operational monitoring (e.g., Resource Conservation and Recovery Act [RCRA], Comprehensive Environmental Response, Compensation, and Liability Act, and State Waste Discharge Permits), constituents, monitoring frequencies, and boundaries require

  4. Performance assessment of the proposed Monitored Retrievable Storage Facility

    International Nuclear Information System (INIS)

    Chockie, A.D.; Hostick, C.J.; Winter, C.

    1986-02-01

    Pacific Northwest laboratory (PNL) has completed a performance evaluation of the proposed monitored retrievable storage (MRS) facility. This study was undertaken as part of the Department of Energy MRS Program at PNL. The objective of the performance evaluation was to determine whether the conceptual MRS facility would be able to process spent fuel at the specified design rate of 3600 metric tons of uranium (MTU) per year. The performance of the proposed facility was assessed using the computer model COMPACT (Computer Optimization of Processing and Cask Transport) to simulate facility operations. The COMPACT model consisted of three application models each of which addressed a different aspect of the facility's operation: MRS/waste transportation interface; cask handling capability; and disassembly/consolidation (hot cell) operations. Our conclusions, based on the assessment of design criteria for the proposed facility, are as follows: Facilities and equipment throughout the facility have capability beyond the 3600 MTU/y design requirement. This added capability provides a reserve to compensate for unexpected perturbations in shipping or handling of the spent fuel. Calculations indicate that the facility's maximum maintainable processing capability is approximately 4800 MTU/y

  5. Performance Assessment Monitoring Plan for the Hanford Site Low-Level Waste Burial Grounds

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    2000-01-01

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  6. Performance Monitoring Applied to System Supervision

    Directory of Open Access Journals (Sweden)

    Bertille Somon

    2017-07-01

    Full Text Available Nowadays, automation is present in every aspect of our daily life and has some benefits. Nonetheless, empirical data suggest that traditional automation has many negative performance and safety consequences as it changed task performers into task supervisors. In this context, we propose to use recent insights into the anatomical and neurophysiological substrates of action monitoring in humans, to help further characterize performance monitoring during system supervision. Error monitoring is critical for humans to learn from the consequences of their actions. A wide variety of studies have shown that the error monitoring system is involved not only in our own errors, but also in the errors of others. We hypothesize that the neurobiological correlates of the self-performance monitoring activity can be applied to system supervision. At a larger scale, a better understanding of system supervision may allow its negative effects to be anticipated or even countered. This review is divided into three main parts. First, we assess the neurophysiological correlates of self-performance monitoring and their characteristics during error execution. Then, we extend these results to include performance monitoring and error observation of others or of systems. Finally, we provide further directions in the study of system supervision and assess the limits preventing us from studying a well-known phenomenon: the Out-Of-the-Loop (OOL performance problem.

  7. Chemical monitoring strategy for the assessment of advanced water treatment plant performance.

    Science.gov (United States)

    Drewes, J E; McDonald, J A; Trinh, T; Storey, M V; Khan, S J

    2011-01-01

    A pilot-scale plant was employed to validate the performance of a proposed full-scale advanced water treatment plant (AWTP) in Sydney, Australia. The primary aim of this study was to develop a chemical monitoring program that can demonstrate proper plant operation resulting in the removal of priority chemical constituents in the product water. The feed water quality to the pilot plant was tertiary-treated effluent from a wastewater treatment plant. The unit processes of the AWTP were comprised of an integrated membrane system (ultrafiltration, reverse osmosis) followed by final chlorination generating a water quality that does not present a source of human or environmental health concern. The chemical monitoring program was undertaken over 6 weeks during pilot plant operation and involved the quantitative analysis of pharmaceuticals and personal care products, steroidal hormones, industrial chemicals, pesticides, N-nitrosamines and halomethanes. The first phase consisted of baseline monitoring of target compounds to quantify influent concentrations in feed waters to the plant. This was followed by a period of validation monitoring utilising indicator chemicals and surrogate measures suitable to assess proper process performance at various stages of the AWTP. This effort was supported by challenge testing experiments to further validate removal of a series of indicator chemicals by reverse osmosis. This pilot-scale study demonstrated a simplified analytical approach that can be employed to assure proper operation of advanced water treatment processes and the absence of trace organic chemicals.

  8. Integrated Monitoring System for Durability Assessment of Concrete Bridges

    Directory of Open Access Journals (Sweden)

    Cristian-Claudiu Comisu

    2005-01-01

    Full Text Available An ageing and deteriorating bridge stock presents the bridge owners with the growing challenge of maintaining the structures at a satisfactory level of safety, performance and aesthetic appearance within the allocated budgets. This task calls for optimized bridge management based on efficient methods of selecting technical and economical optimal maintenance and rehabilitation strategies. One of the crucial points in the assessment of the current condition and future development and performance. Selecting the optimal maintenance and rehabilitation strategy within the actual budget is a key point in bridge management for which an accurate assessment of performance and deterioration rate is necessary. For this assessment, the use of integrated monitoring system has several advantages compared to the traditional approach of scattered visual inspections combined with occasional on site testing with portable equipment and laboratory testing of collected samples. For this reason, attention is more focusing on the development of permanent integrated monitoring system for durability assessment of concrete bridges. It is estimated that with the implementation of such integrated monitoring systems, it should be possible to reduce the operating costs of inspections and maintenance by 25% and the operator of the structures will be able to take protective actions before damaging processes start. This paper indentifies the main bridge owner requirements to integrated monitoring systems and outlines how monitoring systems may be used for performance and deterioration rate assessment to establish a better basis for selecting the optimal maintenance and rehabilitation strategy.

  9. Effects of training self-assessment and using assessment standards on retrospective and prospective monitoring of problem solving

    NARCIS (Netherlands)

    Baars, Martine; Vink, Sigrid; van Gog, Tamara; de Bruin, Anique; Paas, Fred

    2014-01-01

    Both retrospective and prospective monitoring are considered important for self-regulated learning of problem-solving skills. Retrospective monitoring (or self-assessment; SA) refers to students' assessments of how well they performed on a problem just completed. Prospective monitoring (or Judgments

  10. The Performance Assessment of the Detector for the Portable Environmental Radiation Distribution Monitoring System with Rapid Nuclide Recognition

    International Nuclear Information System (INIS)

    Lee, Uk Jae; Kim, Hee Reyoung

    2015-01-01

    The environment radiation distribution monitoring system measures the radiation using a portable detector and display the overall radiation distribution. Bluetooth and RS-232 communications are used for constructing monitoring system. However RS-232 serial communication is known to be more stable than Bluetooth and also it can use the detector's raw data which will be used for getting the activity of each artificial nuclide. In the present study, the detection and communication performance of the developed detector with RS-232 method is assessed by using standard sources for the real application to the urban or rural environment. Assessment of the detector for the portable environmental radiation distribution monitoring system with rapid nuclide recognition was carried out. It was understood that the raw data of detector could be effectively treated by using RS-232 method and the measurement showed a good agreement with the calculation within the relative error of 0.4 % in maximum

  11. The Performance Assessment of the Detector for the Portable Environmental Radiation Distribution Monitoring System with Rapid Nuclide Recognition

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Uk Jae; Kim, Hee Reyoung [Ulsan National Institute of Science and Technology, Ulsan (Korea, Republic of)

    2015-05-15

    The environment radiation distribution monitoring system measures the radiation using a portable detector and display the overall radiation distribution. Bluetooth and RS-232 communications are used for constructing monitoring system. However RS-232 serial communication is known to be more stable than Bluetooth and also it can use the detector's raw data which will be used for getting the activity of each artificial nuclide. In the present study, the detection and communication performance of the developed detector with RS-232 method is assessed by using standard sources for the real application to the urban or rural environment. Assessment of the detector for the portable environmental radiation distribution monitoring system with rapid nuclide recognition was carried out. It was understood that the raw data of detector could be effectively treated by using RS-232 method and the measurement showed a good agreement with the calculation within the relative error of 0.4 % in maximum.

  12. Performance monitoring for brain-computer-interface actions.

    Science.gov (United States)

    Schurger, Aaron; Gale, Steven; Gozel, Olivia; Blanke, Olaf

    2017-02-01

    When presented with a difficult perceptual decision, human observers are able to make metacognitive judgements of subjective certainty. Such judgements can be made independently of and prior to any overt response to a sensory stimulus, presumably via internal monitoring. Retrospective judgements about one's own task performance, on the other hand, require first that the subject perform a task and thus could potentially be made based on motor processes, proprioceptive, and other sensory feedback rather than internal monitoring. With this dichotomy in mind, we set out to study performance monitoring using a brain-computer interface (BCI), with which subjects could voluntarily perform an action - moving a cursor on a computer screen - without any movement of the body, and thus without somatosensory feedback. Real-time visual feedback was available to subjects during training, but not during the experiment where the true final position of the cursor was only revealed after the subject had estimated where s/he thought it had ended up after 6s of BCI-based cursor control. During the first half of the experiment subjects based their assessments primarily on the prior probability of the end position of the cursor on previous trials. However, during the second half of the experiment subjects' judgements moved significantly closer to the true end position of the cursor, and away from the prior. This suggests that subjects can monitor task performance when the task is performed without overt movement of the body. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. Assessment of professional engineering skills - define, monitor and assess

    DEFF Research Database (Denmark)

    Andersson, Niclas; Andersson, Pernille Hammar

    2012-01-01

    , professional engineering skills need to be included in the syllabus of engineering courses and study programs, which in turn call for the implementation of learning objectives, teaching activities as well as methods for assessing the professional performance of the engineering students. The implicit...... life experience from industry and consequently, they might have limited knowledge about professional skills which of course delimits their ability to evaluate the students’ professional performance. The objective of this study is to design and test a method to assess professional skills...... in an engineering teaching context. A suggested approach, based on the three consecutive steps of Define – MonitorAssess, was applied and tested in an engineering course in which the students and professional engineers from industry interacted in an extensive role play simulation. The students’ were actively...

  14. Plant performance monitoring program at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2004-01-01

    A high level of nuclear safety and plant reliability results from the complex interaction of a good design, operational safety and human performance. This is the reason for establishing a set of operational plant safety performance indicators, to enable monitoring of both plant performance and progress. Performance indicators are also used for setting challenging targets and goals for improvement, to gain additional perspective on performance relative to other plants and to provide an indication of a potential need to adjust priorities and resources to achieve improved overall plant performance. A specific indicator trend over a certain period can provide an early warning to plant management to evaluate the causes behind the observed changes. In addition to monitoring the changes and trends, it is also necessary to compare the indicators with identified targets and goals to evaluate performance strengths and weaknesses. Plant Performance Monitoring Program at Krsko NPP defines and ensures consistent collection, processing, analysis and use of predefined relevant plant operational data, providing a quantitative indication of nuclear power plant performance. When the program was developed, the conceptual framework described in IAEA TECDOC-1141 Operational Safety Performance Indicators for Nuclear Power Plants was used as its basis in order to secure that a reasonable set of quantitative indications of operational safety performance would be established. Safe, conservative, cautious and reliable operation of the Krsko NPP is a common goal for all plant personnel. It is provided by continuous assurance of both health and safety of the public and employees according to the plant policy stated in program MD-1 Notranje usmeritve in cilji NEK, which is the top plant program. Establishing a program of monitoring and assessing operational plant safety performance indicators represents effective safety culture of plant personnel.(author)

  15. Thermal performance monitoring and assessment in Dukovany nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Madron, F. [Chemplant Technology s.r.o., Hrncirska 4, 400 01 Usti nad Labem (Czech Republic); Papuga, J. [CEZ a.s., JE Dukovany, 675 50 Dukovany (Czech Republic); Pliska, J. [I and C ENERGO a.s., Prazska 684, 674 01 Trebic (Czech Republic)

    2006-07-01

    Competition in the European electricity market forces generators to achieve - in compliance with safety and environmental standards - efficiency of production as high as possible. This efficiency or heat rate is an important indicator of both the condition of the plant equipment and the quality of plant operation. Similar thermal performance indicators can also be calculated for components of the plant equipment such as heat exchangers. However, it is not easy to quantify these indicators with sufficient precision so that the results can be used for conduct of plant operation in near-real time and for predictive maintenance. This paper describes a present state of the system monitoring and evaluating thermal performance of the reactor units in Dukovany Nuclear Power Plant. The system provides information on actual and desirable (should-be) values of thermal performance indicators for control room operators, performance engineers and maintenance planners. The system is designed to monitor steady states and has two main functions: data validation and process simulation. Data validation is based on data reconciliation methodology and carried out with Recon software by Chemplant Technology. A detailed model of the secondary side for mass and heat balancing has been made up by means of the Recon's graphical editor; now it contains roughly 300 flows and employs data of about 200 measurements. Main advantages of the data reconciliation are: - reconciled data are consistent with the model, - reconciled data are more precise than data directly measured with consequence that the thermal power of steam generators is determined with substantially lower uncertainty than before - data reconciliation represents a solid basis for detection and identification of data corrupted by gross errors. Simulation is performed with a different analytical model of plant components configured into secondary side. The model has been developed by I and C Energo. Main purposes of simulation

  16. 12 CFR 621.10 - Monitoring of performance categories and other property owned.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Monitoring of performance categories and other property owned. 621.10 Section 621.10 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM ACCOUNTING AND REPORTING REQUIREMENTS Loan Performance and Valuation Assessment § 621.10 Monitoring of...

  17. On-Line Monitoring of Instrument Channel Performance in Nuclear Power Plant Using PEANO

    International Nuclear Information System (INIS)

    Fantoni, Paolo F.; Hoffmann, Mario; Shankar, Ramesh; Davis, Eddie L.

    2002-01-01

    On-Line monitoring evaluates instrument channel performance by assessing its consistency with other plant indications. Industry and EPRI experience at several plants has shown this overall approach to be very effective in identifying instrument channels that are exhibiting degrading or inconsistent performance characteristics. On-Line monitoring of instrument channels provides information about the condition of the monitored channels through accurate, more frequent monitoring of each channel's performance over time. This type of performance monitoring is a methodology that offers an alternate approach to traditional time-directed calibration. On-line monitoring of these channels can provide an assessment of instrument performance and provide a basis for determining when adjustments are necessary. Elimination or reduction of unnecessary field calibrations can reduce associated labor costs, reduce personnel radiation exposure and reduce the potential for miss-calibration. PEANO is a system for on-line calibration monitoring developed in the years 1995-2000 at the Institutt for energiteknikk (IFE), Norway, which makes use of Artificial Intelligence techniques for its purpose. The system has been tested successfully in Europe in off-line tests with EDF (France), Tecnatom (Spain) and ENEA (Italy). PEANO is currently installed and used for on-line monitoring at the HBWR reactor in Halden. This paper describes the results of performance tests on PEANO with real data from a US PWR plant, in the framework of a co-operation among IFE, EPRI and Edan Engineering, to evaluate the potentials of PEANO for future installations in US nuclear plants. (authors)

  18. Assessment of dynamic and long-term performance of an innovative multi-story timber building via structural monitoring and dynamic testing

    Science.gov (United States)

    Omenzetter, Piotr; Morris, Hugh; Worth, Margaret; Gaul, Andrew; Jager, Simon; Desgeorges, Yohann

    2012-04-01

    An innovative three-story timber building, using self-centering, post-tensioned timber shear walls as the main horizontal load resisting system and lightweight non-composite timber-concrete floors, has recently been completed in Nelson, New Zealand. It is expected to be the trailblazer for similar but taller structures to be more widely adopted. Performance based standards require an advanced understanding of building responses and in order to meet the need for in-situ performance data the building has been subjected to forced vibration testing and instrumented for continuous monitoring using a total of approximately 90 data channels to capture its dynamic and long-term responses. The first part of the paper presents a brief discussion of the existing research on the seismic performance of timber frame buildings and footfall induced floor vibrations. An outline of the building structural system, focusing on the novel design solutions, is then discussed. This is followed by the description of the monitoring system. The analysis of monitoring results starts with a discussion of the monitoring of long-term deformations. Next, the assessment of the floor vibration serviceability performance is outlined. Then, the forced vibration tests conducted on the whole building at different construction stages are reviewed. The system identification results from seismic shaking records are also discussed. Finally, updating of a finite element model of the building is conducted.

  19. Corral Monitoring System assessment results

    International Nuclear Information System (INIS)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system

  20. Corral Monitoring System assessment results

    Energy Technology Data Exchange (ETDEWEB)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

  1. The effects of monitoring environment on problem-solving performance.

    Science.gov (United States)

    Laird, Brian K; Bailey, Charles D; Hester, Kim

    2018-01-01

    While effective and efficient solving of everyday problems is important in business domains, little is known about the effects of workplace monitoring on problem-solving performance. In a laboratory experiment, we explored the monitoring environment's effects on an individual's propensity to (1) establish pattern solutions to problems, (2) recognize when pattern solutions are no longer efficient, and (3) solve complex problems. Under three work monitoring regimes-no monitoring, human monitoring, and electronic monitoring-114 participants solved puzzles for monetary rewards. Based on research related to worker autonomy and theory of social facilitation, we hypothesized that monitored (versus non-monitored) participants would (1) have more difficulty finding a pattern solution, (2) more often fail to recognize when the pattern solution is no longer efficient, and (3) solve fewer complex problems. Our results support the first two hypotheses, but in complex problem solving, an interaction was found between self-assessed ability and the monitoring environment.

  2. A Mountain-Scale Monitoring Network for Yucca Mountain Performance Confirmation

    International Nuclear Information System (INIS)

    Freifeld, Barry; Tsang, Yvonne

    2006-01-01

    Confirmation of the performance of Yucca Mountain is required by 10 CFR Part 63.131 to indicate, where practicable, that the natural system acts as a barrier, as intended. Hence, performance confirmation monitoring and testing would provide data for continued assessment during the pre-closure period. In general, to carry out testing at a relevant scale is always important, and in the case of performance confirmation, it is particularly important to be able to test at the scale of the repository. We view the large perturbation caused by construction of the repository at Yucca Mountain as a unique opportunity to study the large-scale behavior of the natural barrier system. Repository construction would necessarily introduce traced fluids and result in the creation of leachates. A program to monitor traced fluids and construction leachates permits evaluation of transport through the unsaturated zone and potentially downgradient through the saturated zone. A robust sampling and monitoring network for continuous measurement of important parameters, and for periodic collection of agrochemical samples, is proposed to observe thermo-hydrogeochemical changes near the repository horizon and down to the water table. The sampling and monitoring network can be used to provide data to (1) assess subsurface conditions encountered and changes in those conditions during construction and waste emplacement operations; and (2) for modeling to determine that the natural system is functioning as intended

  3. Assessing Static Performance of the Dashengguan Yangtze Bridge by Monitoring the Correlation between Temperature Field and Its Static Strains

    Directory of Open Access Journals (Sweden)

    Gao-Xin Wang

    2015-01-01

    Full Text Available Taking advantage of the structural health monitoring system installed on the steel truss arch girder of Dashengguan Yangtze Bridge, the temperature field data and static strain data are collected and analyzed for the static performance assessment of the bridge. Through analysis, it is found that the static strain changes are mainly caused by temperature field (temperature and temperature difference and train. After the train-induced static strains are removed, the correlation between the remaining static strains and the temperature field shows apparent linear characteristics, which can be mathematically modeled for the description of static performance. Therefore, multivariate linear regression function combined with principal component analysis is introduced to mathematically model the correlation. Furthermore, the residual static strains of mathematical model are adopted as assessment indicator and three kinds of degradation regulations of static performance are obtained after simulation of the residual static strains. Finally, it is concluded that the static performance of Dashengguan Yangtze Bridge was in a good condition during that period.

  4. 5 CFR 430.306 - Monitoring performance.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Monitoring performance. 430.306 Section 430.306 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.306 Monitoring performance. (a) Supervisors must...

  5. Heat exchanger performance monitoring guidelines

    International Nuclear Information System (INIS)

    Stambaugh, N.; Closser, W. Jr.; Mollerus, F.J.

    1991-12-01

    Fouling can occur in many heat exchanger applications in a way that impedes heat transfer and fluid flow and reduces the heat transfer or performance capability of the heat exchanger. Fouling may be significant for heat exchanger surfaces and flow paths in contact with plant service water. This report presents guidelines for performance monitoring of heat exchangers subject to fouling. Guidelines include selection of heat exchangers to monitor based on system function, safety function and system configuration. Five monitoring methods are discussed: the heat transfer, temperature monitoring, temperature effectiveness, delta P and periodic maintenance methods. Guidelines are included for selecting the appropriate monitoring methods and for implementing the selected methods. The report also includes a bibliography, example calculations, and technical notes applicable to the heat transfer method

  6. Neuropharmacology of performance monitoring.

    Science.gov (United States)

    Jocham, Gerhard; Ullsperger, Markus

    2009-01-01

    Adaptive, goal-directed behavior requires that organisms evaluate their actions in terms of their outcomes. Neuroimaging studies show that unfavorable outcomes or situations with high level of conflict engage the posterior medial frontal cortex (pMFC). Recording of event-related potentials revealed that these situations are accompanied by a negative deflection, the so-called error-related negativity (ERN), which appears after an erroneous response or after negative feedback. Both activation of the pMFC and the ERN are thought to represent a signal that indicates the need for behavioral adjustment, and to recruit other brain regions that implement these adjustments. While many fMRI and EEG studies have shed light on the anatomical structures and the cognitive processes involved in performance monitoring, only very recently have researchers begun to investigate the underlying neurochemical mechanisms. Drawing on the putative involvement of dopamine (DA) neurons in coding a reward prediction error, an influential theory has ascribed a pivotal role to DA in performance monitoring. However, although important, DA is certainly not the only neuromodulator involved. Recent studies point to a role for serotonin, norepinephrine and GABA, but also for adenosine in performance monitoring. Here, we review the evidence for neurotransmitter effects on this function in humans. In this light, we critically discuss currently debated models of performance monitoring and potential alternatives.

  7. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  8. Photochemical Assessment Monitoring Stations (PAMS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Photochemical Assessment Monitoring Stations (PAMS). This file provides information on the numbers and distribution (latitude/longitude) of air monitoring sites...

  9. Do conventional monitoring practices indicate in situ air sparging performance?

    International Nuclear Information System (INIS)

    Johnson, P.C.

    1995-01-01

    Short-term pilot tests play a key role in the selection and design of in situ air sparging systems. Most pilot tests are less than 24 h in duration and consist of monitoring changes in dissolved oxygen, water levels in wells, soil gas pressures, and soil gas contaminant concentrations while air is injected into the aquifer. These parameters are assumed to be indicators of air sparging feasibility and performance, and are also used in the design of full-scale systems. In this work the authors assess the validity of this critical assumption. Data are presented from a study site where a typical pilot-scale short-term test was conducted, followed by continued operation of a full-scale system for 110 days. Conventional sampling practices were augmented with more discrete and detailed assessment methods. In addition, a tracer gas was used to better understand air distributions, vapor flow paths, and vapor recovery efficiency. The data illustrate that conclusions regarding the performance and applicability of air sparging at the study site vary significantly depending on the monitoring approach used. There was no clear correlation between short-term pilot-test data and extended system performance when using data collected only from conventional groundwater monitoring wells. Attention is focused on petroleum hydrocarbons

  10. 296-B-5 Stack monitoring and sampling system annual system assessment report

    International Nuclear Information System (INIS)

    Ridge, T.M.

    1995-02-01

    The B Plant Administration Manual requires an annual system assessment to evaluate and report the present condition of the sampling and monitoring system associated with Stack 296-B-5 at B Plant. The sampling and monitoring system associated with stack 296-B-5 is functional and performing satisfactorily. This document is an annual assessment report of the systems associated with the 296-B-5 stack

  11. Multileaf collimator performance monitoring and improvement using semiautomated quality control testing and statistical process control

    International Nuclear Information System (INIS)

    Létourneau, Daniel; McNiven, Andrea; Keller, Harald; Wang, An; Amin, Md Nurul; Pearce, Jim; Norrlinger, Bernhard; Jaffray, David A.

    2014-01-01

    Purpose: High-quality radiation therapy using highly conformal dose distributions and image-guided techniques requires optimum machine delivery performance. In this work, a monitoring system for multileaf collimator (MLC) performance, integrating semiautomated MLC quality control (QC) tests and statistical process control tools, was developed. The MLC performance monitoring system was used for almost a year on two commercially available MLC models. Control charts were used to establish MLC performance and assess test frequency required to achieve a given level of performance. MLC-related interlocks and servicing events were recorded during the monitoring period and were investigated as indicators of MLC performance variations. Methods: The QC test developed as part of the MLC performance monitoring system uses 2D megavoltage images (acquired using an electronic portal imaging device) of 23 fields to determine the location of the leaves with respect to the radiation isocenter. The precision of the MLC performance monitoring QC test and the MLC itself was assessed by detecting the MLC leaf positions on 127 megavoltage images of a static field. After initial calibration, the MLC performance monitoring QC test was performed 3–4 times/week over a period of 10–11 months to monitor positional accuracy of individual leaves for two different MLC models. Analysis of test results was performed using individuals control charts per leaf with control limits computed based on the measurements as well as two sets of specifications of ±0.5 and ±1 mm. Out-of-specification and out-of-control leaves were automatically flagged by the monitoring system and reviewed monthly by physicists. MLC-related interlocks reported by the linear accelerator and servicing events were recorded to help identify potential causes of nonrandom MLC leaf positioning variations. Results: The precision of the MLC performance monitoring QC test and the MLC itself was within ±0.22 mm for most MLC leaves

  12. Multileaf collimator performance monitoring and improvement using semiautomated quality control testing and statistical process control.

    Science.gov (United States)

    Létourneau, Daniel; Wang, An; Amin, Md Nurul; Pearce, Jim; McNiven, Andrea; Keller, Harald; Norrlinger, Bernhard; Jaffray, David A

    2014-12-01

    High-quality radiation therapy using highly conformal dose distributions and image-guided techniques requires optimum machine delivery performance. In this work, a monitoring system for multileaf collimator (MLC) performance, integrating semiautomated MLC quality control (QC) tests and statistical process control tools, was developed. The MLC performance monitoring system was used for almost a year on two commercially available MLC models. Control charts were used to establish MLC performance and assess test frequency required to achieve a given level of performance. MLC-related interlocks and servicing events were recorded during the monitoring period and were investigated as indicators of MLC performance variations. The QC test developed as part of the MLC performance monitoring system uses 2D megavoltage images (acquired using an electronic portal imaging device) of 23 fields to determine the location of the leaves with respect to the radiation isocenter. The precision of the MLC performance monitoring QC test and the MLC itself was assessed by detecting the MLC leaf positions on 127 megavoltage images of a static field. After initial calibration, the MLC performance monitoring QC test was performed 3-4 times/week over a period of 10-11 months to monitor positional accuracy of individual leaves for two different MLC models. Analysis of test results was performed using individuals control charts per leaf with control limits computed based on the measurements as well as two sets of specifications of ± 0.5 and ± 1 mm. Out-of-specification and out-of-control leaves were automatically flagged by the monitoring system and reviewed monthly by physicists. MLC-related interlocks reported by the linear accelerator and servicing events were recorded to help identify potential causes of nonrandom MLC leaf positioning variations. The precision of the MLC performance monitoring QC test and the MLC itself was within ± 0.22 mm for most MLC leaves and the majority of the

  13. Thermal performance monitoring and optimisation

    International Nuclear Information System (INIS)

    Sunde, Svein; Berg; Oeyvind

    1998-01-01

    Monitoring of the thermal efficiency of nuclear power plants is expected to become increasingly important as energy-market liberalisation exposes plants to increasing availability requirements and fiercer competition. The general goal in thermal performance monitoring is straightforward: to maximise the ratio of profit to cost under the constraints of safe operation. One may perceive this goal to be pursued in two ways, one oriented towards fault detection and cost-optimal predictive maintenance, and another determined at optimising target values of parameters in response to any component degradation detected, changes in ambient conditions, or the like. Annual savings associated with effective thermal-performance monitoring are expected to be in the order of $ 100 000 for power plants of representative size. A literature review shows that a number of computer systems for thermal-performance monitoring exists, either as prototypes or commercially available. The characteristics and needs of power plants may vary widely, however, and decisions concerning the exact scope, content and configuration of a thermal-performance monitor may well follow a heuristic approach. Furthermore, re-use of existing software modules may be desirable. Therefore, we suggest here the design of a flexible workbench for easy assembly of an experimental thermal-performance monitor at the Halden Project. The suggested design draws heavily on our extended experience in implementing control-room systems featured by assets like high levels of customisation, flexibility in configuration and modularity in structure, and on a number of relevant adjoining activities. The design includes a multi-computer communication system and a graphical user's interface, and aims at a system adaptable to any combination of in-house or end user's modules, as well as commercially available software. (author)

  14. Performance evaluations of continuous glucose monitoring systems: precision absolute relative deviation is part of the assessment.

    Science.gov (United States)

    Obermaier, Karin; Schmelzeisen-Redeker, Günther; Schoemaker, Michael; Klötzer, Hans-Martin; Kirchsteiger, Harald; Eikmeier, Heino; del Re, Luigi

    2013-07-01

    Even though a Clinical and Laboratory Standards Institute proposal exists on the design of studies and performance criteria for continuous glucose monitoring (CGM) systems, it has not yet led to a consistent evaluation of different systems, as no consensus has been reached on the reference method to evaluate them or on acceptance levels. As a consequence, performance assessment of CGM systems tends to be inconclusive, and a comparison of the outcome of different studies is difficult. Published information and available data (as presented in this issue of Journal of Diabetes Science and Technology by Freckmann and coauthors) are used to assess the suitability of several frequently used methods [International Organization for Standardization, continuous glucose error grid analysis, mean absolute relative deviation (MARD), precision absolute relative deviation (PARD)] when assessing performance of CGM systems in terms of accuracy and precision. The combined use of MARD and PARD seems to allow for better characterization of sensor performance. The use of different quantities for calibration and evaluation, e.g., capillary blood using a blood glucose (BG) meter versus venous blood using a laboratory measurement, introduces an additional error source. Using BG values measured in more or less large intervals as the only reference leads to a significant loss of information in comparison with the continuous sensor signal and possibly to an erroneous estimation of sensor performance during swings. Both can be improved using data from two identical CGM sensors worn by the same patient in parallel. Evaluation of CGM performance studies should follow an identical study design, including sufficient swings in glycemia. At least a part of the study participants should wear two identical CGM sensors in parallel. All data available should be used for evaluation, both by MARD and PARD, a good PARD value being a precondition to trust a good MARD value. Results should be analyzed and

  15. Performance assessment of air quality monitoring networks using principal component analysis and cluster analysis

    International Nuclear Information System (INIS)

    Lu, Wei-Zhen; He, Hong-Di; Dong, Li-yun

    2011-01-01

    This study aims to evaluate the performance of two statistical methods, principal component analysis and cluster analysis, for the management of air quality monitoring network of Hong Kong and the reduction of associated expenses. The specific objectives include: (i) to identify city areas with similar air pollution behavior; and (ii) to locate emission sources. The statistical methods were applied to the mass concentrations of sulphur dioxide (SO 2 ), respirable suspended particulates (RSP) and nitrogen dioxide (NO 2 ), collected in monitoring network of Hong Kong from January 2001 to December 2007. The results demonstrate that, for each pollutant, the monitoring stations are grouped into different classes based on their air pollution behaviors. The monitoring stations located in nearby area are characterized by the same specific air pollution characteristics and suggested with an effective management of air quality monitoring system. The redundant equipments should be transferred to other monitoring stations for allowing further enlargement of the monitored area. Additionally, the existence of different air pollution behaviors in the monitoring network is explained by the variability of wind directions across the region. The results imply that the air quality problem in Hong Kong is not only a local problem mainly from street-level pollutions, but also a region problem from the Pearl River Delta region. (author)

  16. Quantitative performance monitoring

    International Nuclear Information System (INIS)

    Heller, A.S.

    1987-01-01

    In the recently published update of NUREG/CR 3883, it was shown that Japanese plants of size and design similar to those in the US have significantly fewer trips in a given year of operation. One way to reduce such imbalance is the efficient use of available plant data. Since plant data are recorded and monitored continuously for management feedback and timely resolution of problems, this data should be actively used to increase the efficiency of operations and, ultimately, for a reduction of plant trips in power plants. A great deal of information is lost, however, if the analytical tools available for the data evaluation are misapplied or not adopted at all. This paper deals with a program developed to use quantitative techniques to monitor personnel performance in an operating power plant. Visual comparisons of ongoing performance with predetermined quantitative performance goals are made. A continuous feedback is provided to management for early detection of adverse trends and timely resolution of problems. Ultimately, costs are reduced through effective resource management and timely decision making

  17. Assessment of SRS ambient air monitoring network

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, K. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jannik, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-08-03

    Three methodologies have been used to assess the effectiveness of the existing ambient air monitoring system in place at the Savannah River Site in Aiken, SC. Effectiveness was measured using two metrics that have been utilized in previous quantification of air-monitoring network performance; frequency of detection (a measurement of how frequently a minimum number of samplers within the network detect an event), and network intensity (a measurement of how consistent each sampler within the network is at detecting events). In addition to determining the effectiveness of the current system, the objective of performing this assessment was to determine what, if any, changes could make the system more effective. Methodologies included 1) the Waite method of determining sampler distribution, 2) the CAP88- PC annual dose model, and 3) a puff/plume transport model used to predict air concentrations at sampler locations. Data collected from air samplers at SRS in 2015 compared with predicted data resulting from the methodologies determined that the frequency of detection for the current system is 79.2% with sampler efficiencies ranging from 5% to 45%, and a mean network intensity of 21.5%. One of the air monitoring stations had an efficiency of less than 10%, and detected releases during just one sampling period of the entire year, adding little to the overall network intensity. By moving or removing this sampler, the mean network intensity increased to about 23%. Further work in increasing the network intensity and simulating accident scenarios to further test the ambient air system at SRS is planned

  18. GEOGLAM Crop Assessment Tool: Adapting from global agricultural monitoring to food security monitoring

    Science.gov (United States)

    Humber, M. L.; Becker-Reshef, I.; Nordling, J.; Barker, B.; McGaughey, K.

    2014-12-01

    The GEOGLAM Crop Monitor's Crop Assessment Tool was released in August 2013 in support of the GEOGLAM Crop Monitor's objective to develop transparent, timely crop condition assessments in primary agricultural production areas, highlighting potential hotspots of stress/bumper crops. The Crop Assessment Tool allows users to view satellite derived products, best available crop masks, and crop calendars (created in collaboration with GEOGLAM Crop Monitor partners), then in turn submit crop assessment entries detailing the crop's condition, drivers, impacts, trends, and other information. Although the Crop Assessment Tool was originally intended to collect data on major crop production at the global scale, the types of data collected are also relevant to the food security and rangelands monitoring communities. In line with the GEOGLAM Countries at Risk philosophy of "foster[ing] the coordination of product delivery and capacity building efforts for national and regional organizations, and the development of harmonized methods and tools", a modified version of the Crop Assessment Tool is being developed for the USAID Famine Early Warning Systems Network (FEWS NET). As a member of the Countries at Risk component of GEOGLAM, FEWS NET provides agricultural monitoring, timely food security assessments, and early warnings of potential significant food shortages focusing specifically on countries at risk of food security emergencies. While the FEWS NET adaptation of the Crop Assessment Tool focuses on crop production in the context of food security rather than large scale production, the data collected is nearly identical to the data collected by the Crop Monitor. If combined, the countries monitored by FEWS NET and GEOGLAM Crop Monitor would encompass over 90 countries representing the most important regions for crop production and food security.

  19. Development of Integrated Assessment Technology of Risk and Performance

    International Nuclear Information System (INIS)

    Yang, Jun Eon; Kang, Dae Il; Kang, Hyun Gook

    2010-04-01

    The main idea and contents are summarized as below 1) Development of new risk/performance assessment system innovating old labor-intensive risk assessment structure - New consolidated risk assessment technology from various hazard(flood, fire, seismic in NPP) - BOP model development for performance monitoring - Consolidated risk/performance management system for consistency and efficiency of NPP 2) Resolution technology for pending issues in PSA - Base technology for PSA of digital I and C system - Base technology for seismic PSA reflecting domestic seismic characteristics and aging effect - Uncertainty reduction technology for level 2 PSA and best estimation of containment failure frequency 3) Next generation risk/performance assessment technology - Human-induced error reduction technology for efficient operation of a NPP

  20. In-flight spectral performance monitoring of the Airborne Prism Experiment.

    Science.gov (United States)

    D'Odorico, Petra; Alberti, Edoardo; Schaepman, Michael E

    2010-06-01

    Spectral performance of an airborne dispersive pushbroom imaging spectrometer cannot be assumed to be stable over a whole flight season given the environmental stresses present during flight. Spectral performance monitoring during flight is commonly accomplished by looking at selected absorption features present in the Sun, atmosphere, or ground, and their stability. The assessment of instrument performance in two different environments, e.g., laboratory and airborne, using precisely the same calibration reference, has not been possible so far. The Airborne Prism Experiment (APEX), an airborne dispersive pushbroom imaging spectrometer, uses an onboard in-flight characterization (IFC) facility, which makes it possible to monitor the sensor's performance in terms of spectral, radiometric, and geometric stability in flight and in the laboratory. We discuss in detail a new method for the monitoring of spectral instrument performance. The method relies on the monitoring of spectral shifts by comparing instrument-induced movements of absorption features on ground and in flight. Absorption lines originate from spectral filters, which intercept the full field of view (FOV) illuminated using an internal light source. A feature-fitting algorithm is used for the shift estimation based on Pearson's correlation coefficient. Environmental parameter monitoring, coregistered on board with the image and calibration data, revealed that differential pressure and temperature in the baffle compartment are the main driving parameters explaining the trend in spectral performance deviations in the time and the space (across-track) domains, respectively. The results presented in this paper show that the system in its current setup needs further improvements to reach a stable performance. Findings provided useful guidelines for the instrument revision currently under way. The main aim of the revision is the stabilization of the instrument for a range of temperature and pressure conditions

  1. PERFORM: a system for monitoring, assessment and management of patients with Parkinson's disease.

    Science.gov (United States)

    Tzallas, Alexandros T; Tsipouras, Markos G; Rigas, Georgios; Tsalikakis, Dimitrios G; Karvounis, Evaggelos C; Chondrogiorgi, Maria; Psomadellis, Fotis; Cancela, Jorge; Pastorino, Matteo; Waldmeyer, María Teresa Arredondo; Konitsiotis, Spiros; Fotiadis, Dimitrios I

    2014-11-11

    In this paper, we describe the PERFORM system for the continuous remote monitoring and management of Parkinson's disease (PD) patients. The PERFORM system is an intelligent closed-loop system that seamlessly integrates a wide range of wearable sensors constantly monitoring several motor signals of the PD patients. Data acquired are pre-processed by advanced knowledge processing methods, integrated by fusion algorithms to allow health professionals to remotely monitor the overall status of the patients, adjust medication schedules and personalize treatment. The information collected by the sensors (accelerometers and gyroscopes) is processed by several classifiers. As a result, it is possible to evaluate and quantify the PD motor symptoms related to end of dose deterioration (tremor, bradykinesia, freezing of gait (FoG)) as well as those related to over-dose concentration (Levodopa-induced dyskinesia (LID)). Based on this information, together with information derived from tests performed with a virtual reality glove and information about the medication and food intake, a patient specific profile can be built. In addition, the patient specific profile with his evaluation during the last week and last month, is compared to understand whether his status is stable, improving or worsening. Based on that, the system analyses whether a medication change is needed--always under medical supervision--and in this case, information about the medication change proposal is sent to the patient. The performance of the system has been evaluated in real life conditions, the accuracy and acceptability of the system by the PD patients and healthcare professionals has been tested, and a comparison with the standard routine clinical evaluation done by the PD patients' physician has been carried out. The PERFORM system is used by the PD patients and in a simple and safe non-invasive way for long-term record of their motor status, thus offering to the clinician a precise, long-term and

  2. Shared performance monitor in a multiprocessor system

    Science.gov (United States)

    Chiu, George; Gara, Alan G.; Salapura, Valentina

    2012-07-24

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU comprises: a plurality of performance counters each for counting signals representing occurrences of events from one or more the plurality of processor units in the multiprocessor system; and, a plurality of input devices for receiving the event signals from one or more processor devices of the plurality of processor units, the plurality of input devices programmable to select event signals for receipt by one or more of the plurality of performance counters for counting, wherein the PMU is shared between multiple processing units, or within a group of processors in the multiprocessing system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  3. Benefits of a Biological Monitoring Program for Assessing Remediation Performance and Long-Term Stewardship - 12272

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Mark [Oak Ridge National Laboratory, Oak Ridge, Tennessee 37831 (United States)

    2012-07-01

    The Biological Monitoring and Abatement Program (BMAP) is a long-running program that was designed to evaluate biological conditions and trends in waters downstream of Department of Energy (DOE) facilities in Oak Ridge, Tennessee. BMAP monitoring has focused on aquatic pathways from sources to biota, which is consistent with the sites' clean water regulatory focus and the overall cleanup strategy which divided remediation areas into watershed administrative units. Specific programmatic goals include evaluating operational and legacy impacts to nearby streams and the effectiveness of implemented remediation strategies at the sites. The program is characterized by consistent, long-term sampling and analysis methods in a multidisciplinary and quantitative framework. Quantitative sampling has shown conclusively that at most Oak Ridge stream sites, fish and aquatic macro-invertebrate communities have improved considerably since the 1980s. Monitoring of mercury and PCBs in fish has shown that remedial and abatement actions have also improved stream conditions, although in some cases biological monitoring suggests further actions are needed. Follow-up investigations have been implemented by BMAP to identify sources or causes, consistent with an adaptive management approach. Biological monitoring results to date have not only been used to assess regulatory compliance, but have provided additional benefits in helping address other components of the DOE's mission, including facility operations, natural resource, and scientific goals. As a result the program has become a key measure of long-term trends in environmental conditions and of high value to the Oak Ridge environmental management community, regulators, and the public. Some of the BMAP lessons learned may be of value in the design, implementation, and application of other long-term monitoring and stewardship programs, and assist environmental managers in the assessment and prediction of the effectiveness of

  4. Real-time performance monitoring and management system

    Science.gov (United States)

    Budhraja, Vikram S [Los Angeles, CA; Dyer, James D [La Mirada, CA; Martinez Morales, Carlos A [Upland, CA

    2007-06-19

    A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

  5. Assessment and monitoring practices of Australian fitness professionals.

    Science.gov (United States)

    Bennie, Jason A; Wiesner, Glen H; van Uffelen, Jannique G Z; Harvey, Jack T; Craike, Melinda J; Biddle, Stuart J H

    2018-04-01

    Assessment and monitoring of client health and fitness is a key part of fitness professionals' practices. However, little is known about prevalence of this practice. This study describes the assessment/monitoring practices of a large sample of Australian fitness professionals. Cross-sectional. In 2014, 1206 fitness professionals completed an online survey. Respondents reported their frequency (4 point-scale: [1] 'never' to [4] 'always') of assessment/monitoring of eight health and fitness constructs (e.g. body composition, aerobic fitness). This was classified as: (i) 'high' ('always' assessing/monitoring ≥5 constructs); (ii) 'medium' (1-4 constructs); (iii) 'low' (0 constructs). Classifications are reported by demographic and fitness industry characteristics. The odds of being classified as a 'high assessor/monitor' according to social ecological correlates were examined using a multiple-factor logistic regression model. Mean age of respondents was 39.3 (±11.6) years and 71.6% were female. A total of 15.8% (95% CI: 13.7%-17.9%) were classified as a 'high' assessor/monitor. Constructs with the largest proportion of being 'always' assessed were body composition (47.7%; 95% CI: 45.0%-50.1%) and aerobic fitness (42.5%; 95% CI: 39.6%-45.3%). Those with the lowest proportion of being 'always' assessed were balance (24.0%; 95% CI: 24.7%-26.5%) and mental health (20.2%; 95% CI: 18.1%-29.6%). A perceived lack of client interest and fitness professionals not considering assessing their responsibility were associated with lower odds of being classified as a 'high assessor/monitor'. Most fitness professionals do not routinely assess/monitor client fitness and health. Key factors limiting client health assessment and monitoring include a perceived lack of client interest and professionals not considering this their role. Copyright © 2017. Published by Elsevier Ltd.

  6. Performance Assessment Institute-NV

    Energy Technology Data Exchange (ETDEWEB)

    Lombardo, Joesph [Univ. of Nevada, Las Vegas, NV (United States)

    2012-12-31

    The National Supercomputing Center for Energy and the Environment’s intention is to purchase a multi-purpose computer cluster in support of the Performance Assessment Institute (PA Institute). The PA Institute will serve as a research consortium located in Las Vegas Nevada with membership that includes: national laboratories, universities, industry partners, and domestic and international governments. This center will provide a one-of-a-kind centralized facility for the accumulation of information for use by Institutions of Higher Learning, the U.S. Government, and Regulatory Agencies and approved users. This initiative will enhance and extend High Performance Computing (HPC) resources in Nevada to support critical national and international needs in "scientific confirmation". The PA Institute will be promoted as the leading Modeling, Learning and Research Center worldwide. The program proposes to utilize the existing supercomputing capabilities and alliances of the University of Nevada Las Vegas as a base, and to extend these resource and capabilities through a collaborative relationship with its membership. The PA Institute will provide an academic setting for interactive sharing, learning, mentoring and monitoring of multi-disciplinary performance assessment and performance confirmation information. The role of the PA Institute is to facilitate research, knowledge-increase, and knowledge-sharing among users.

  7. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 2, Radiation Monitoring and Sampling

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The FRMAC Monitoring and Sampling Manual, Volume 2 provides standard operating procedures (SOPs) for field radiation monitoring and sample collection activities that are performed by the Monitoring group during a FRMAC response to a radiological emergency.

  8. Performance assessment of indigenously developed FBG strain ...

    Indian Academy of Sciences (India)

    Use of FBG sensors for real time health monitoring of various civil engineering structures is well-established in western world since last decade, whereas in the Indian context this technology is still in a nascent stage. In this paper, performance assessment of indigenously developed FBG sensors for the application of health ...

  9. Modular Software Performance Monitoring

    CERN Document Server

    Kruse, D F

    2011-01-01

    CPU clock frequency is not likely to be increased significantly in the coming years, and data analysis speed can be improved by using more processors or buying new machines, only if one is willing to change the paradigm to a parallel one. Therefore, performance monitoring procedures and tools are needed to help programmers to optimize existing software running on current and future hardware. Low level information from hardware performance counters is vital to spot specific performance problems slowing program execution. HEP software is often huge and complex, and existing tools are unable to give results with the required granularity. We will report on the approach we have chose to solve this problem that involves decomposing the application into parts and monitoring each of them separately. Both counting and sampling methods are used to allow an analysis with the required custom granularity: from global level, up to the function level. A set of tools (based on perfmon2 – a software interface to hardware co...

  10. Using the expected detection delay to assess the performance of different multivariate statistical process monitoring methods for multiplicative and drift faults.

    Science.gov (United States)

    Zhang, Kai; Shardt, Yuri A W; Chen, Zhiwen; Peng, Kaixiang

    2017-03-01

    Using the expected detection delay (EDD) index to measure the performance of multivariate statistical process monitoring (MSPM) methods for constant additive faults have been recently developed. This paper, based on a statistical investigation of the T 2 - and Q-test statistics, extends the EDD index to the multiplicative and drift fault cases. As well, it is used to assess the performance of common MSPM methods that adopt these two test statistics. Based on how to use the measurement space, these methods can be divided into two groups, those which consider the complete measurement space, for example, principal component analysis-based methods, and those which only consider some subspace that reflects changes in key performance indicators, such as partial least squares-based methods. Furthermore, a generic form for them to use T 2 - and Q-test statistics are given. With the extended EDD index, the performance of these methods to detect drift and multiplicative faults is assessed using both numerical simulations and the Tennessee Eastman process. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.

  11. A monitoring tool for performance improvement in plastic surgery at the individual level.

    Science.gov (United States)

    Maruthappu, Mahiben; Duclos, Antoine; Orgill, Dennis; Carty, Matthew J

    2013-05-01

    The assessment of performance in surgery is expanding significantly. Application of relevant frameworks to plastic surgery, however, has been limited. In this article, the authors present two robust graphic tools commonly used in other industries that may serve to monitor individual surgeon operative time while factoring in patient- and surgeon-specific elements. The authors reviewed performance data from all bilateral reduction mammaplasties performed at their institution by eight surgeons between 1995 and 2010. Operative time was used as a proxy for performance. Cumulative sum charts and exponentially weighted moving average charts were generated using a train-test analytic approach, and used to monitor surgical performance. Charts mapped crude, patient case-mix-adjusted, and case-mix and surgical-experience-adjusted performance. Operative time was found to decline from 182 minutes to 118 minutes with surgical experience (p factors is essential for correct interpretation of performance in plastic surgery at the individual surgeon level. Cumulative sum and exponentially weighted moving average charts represent accurate methods of monitoring operative time to control and potentially improve surgeon performance over the course of a career.

  12. Regional Environmental Monitoring and Assessment Program Data (REMAP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Regional Environmental Monitoring and Assessment Program (REMAP) was initiated to test the applicability of the Environmental Monitoring and Assessment Program...

  13. Omitting cytogenetic assessment from routine treatment response monitoring in chronic myeloid leukemia is safe.

    Science.gov (United States)

    Geelen, Inge G P; Thielen, Noortje; Janssen, Jeroen J W M; Hoogendoorn, Mels; Roosma, Tanja J A; Valk, Peter J M; Visser, Otto; Cornelissen, Jan J; Westerweel, Peter E

    2018-04-01

    The monitoring of response in chronic myeloid leukemia (CML) is of great importance to identify patients failing their treatment in order to adjust TKI choice and thereby prevent progression to advanced stage disease. Cytogenetic monitoring has a lower sensitivity, is expensive, and requires invasive bone marrow sampling. Nevertheless, chronic myeloid leukemia guidelines continue to recommend performing routine cytogenetic response assessments, even when adequate molecular diagnostics are available. In a population-based registry of newly diagnosed CML patients in the Netherlands, all simultaneous cytogenetic and molecular assessments performed at 3, 6, and 12 months were identified and response of these matched assessments was classified according to European Leukemia Net (ELN) recommendations. The impact of discrepant cytogenetic and molecular response classifications and course of patients with additional chromosomal abnormalities were evaluated. The overall agreement of 200 matched assessments was 78%. In case of discordant responses, response at 24 months was consistently better predicted by the molecular outcome. Cytogenetic response assessments provided relevant additional clinical information only in some cases of molecular "warning." The development of additional cytogenetic abnormalities was always accompanied with molecular failure. We conclude that it is safe to omit routine cytogenetics for response assessment during treatment and to only use molecular monitoring, in order to prevent ambiguous classifications, reduce costs, and reduce the need for invasive bone marrow sampling. Cytogenetic re-assessment should still be performed when molecular response is suboptimal. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  14. WiMAX network performance monitoring & optimization

    DEFF Research Database (Denmark)

    Zhang, Qi; Dam, H

    2008-01-01

    frequency reuse, capacity planning, proper network dimensioning, multi-class data services and so on. Furthermore, as a small operator we also want to reduce the demand for sophisticated technicians and man labour hours. To meet these critical demands, we design a generic integrated network performance......In this paper we present our WiMAX (worldwide interoperability for microwave access) network performance monitoring and optimization solution. As a new and small WiMAX network operator, there are many demanding issues that we have to deal with, such as limited available frequency resource, tight...... this integrated network performance monitoring and optimization system in our WiMAX networks. This integrated monitoring and optimization system has such good flexibility and scalability that individual function component can be used by other operators with special needs and more advanced function components can...

  15. PERFORM: A System for Monitoring, Assessment and Management of Patients with Parkinson’s Disease

    Directory of Open Access Journals (Sweden)

    Alexandros T. Tzallas

    2014-11-01

    Full Text Available In this paper, we describe the PERFORM system for the continuous remote monitoring and management of Parkinson’s disease (PD patients. The PERFORM system is an intelligent closed-loop system that seamlessly integrates a wide range of wearable sensors constantly monitoring several motor signals of the PD patients. Data acquired are pre-processed by advanced knowledge processing methods, integrated by fusion algorithms to allow health professionals to remotely monitor the overall status of the patients, adjust medication schedules and personalize treatment. The information collected by the sensors (accelerometers and gyroscopes is processed by several classifiers. As a result, it is possible to evaluate and quantify the PD motor symptoms related to end of dose deterioration (tremor, bradykinesia, freezing of gait (FoG as well as those related to over-dose concentration (Levodopa-induced dyskinesia (LID. Based on this information, together with information derived from tests performed with a virtual reality glove and information about the medication and food intake, a patient specific profile can be built. In addition, the patient specific profile with his evaluation during the last week and last month, is compared to understand whether his status is stable, improving or worsening. Based on that, the system analyses whether a medication change is needed—always under medical supervision—and in this case, information about the medication change proposal is sent to the patient. The performance of the system has been evaluated in real life conditions, the accuracy and acceptability of the system by the PD patients and healthcare professionals has been tested, and a comparison with the standard routine clinical evaluation done by the PD patients’ physician has been carried out. The PERFORM system is used by the PD patients and in a simple and safe non-invasive way for long-term record of their motor status, thus offering to the clinician a

  16. Safety Culture Monitoring: How to Assess Safety Culture in Real Time?

    International Nuclear Information System (INIS)

    Zronek, B.; Maryska, J.; Treslova, L.

    2016-01-01

    Do you know what is current level of safety culture in your company? Are you able to follow trend changes? Do you know what your recent issues are? Since safety culture is understood as vital part of nuclear industry daily life, it is crucial to know what the current level is. It is common to perform safety culture survey or ad hoc assessment. This contribution shares Temelin NPP, CEZ approach how to assess safety culture level permanently. Using behavioral related outputs of gap solving system, observation program, dedicated surveys, regulatory assessment, etc., allows creating real time safety culture monitoring without the need to perform any other activities. (author)

  17. A multi-objective assessment of an air quality monitoring network using environmental, economic, and social indicators and GIS-based models.

    Science.gov (United States)

    Pope, Ronald; Wu, Jianguo

    2014-06-01

    In the United States, air pollution is primarily measured by Air Quality Monitoring Networks (AQMN). These AQMNs have multiple objectives, including characterizing pollution patterns, protecting the public health, and determining compliance with air quality standards. In 2006, the U.S. Environmental Protection Agency issued a directive that air pollution agencies assess the performance of their AQMNs. Although various methods to design and assess AQMNs exist, here we demonstrate a geographic information system (GIS)-based approach that combines environmental, economic, and social indicators through the assessment of the ozone (O3) and particulate matter (PM10) networks in Maricopa County, Arizona. The assessment was conducted in three phases: (1) to evaluate the performance of the existing networks, (2) to identify areas that would benefit from the addition of new monitoring stations, and (3) to recommend changes to the AQMN. A comprehensive set of indicators was created for evaluating differing aspects of the AQMNs' objectives, and weights were applied to emphasize important indicators. Indicators were also classified according to their sustainable development goal. Our results showed that O3 was well represented in the county with some redundancy in terms of the urban monitors. The addition of weights to the indicators only had a minimal effect on the results. For O3, urban monitors had greater social scores, while rural monitors had greater environmental scores. The results did not suggest a need for adding more O3 monitoring sites. For PM10, clustered urban monitors were redundant, and weights also had a minimal effect on the results. The clustered urban monitors had overall low scores; sites near point sources had high environmental scores. Several areas were identified as needing additional PM10 monitors. This study demonstrates the usefulness of a multi-indicator approach to assess AQMNs. Network managers and planners may use this method to assess the

  18. Emergency radiological monitoring and analysis: Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1995-01-01

    The US Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. The FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC), which is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted State(s) and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division (M ampersand A) is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis, and quality assurance. To assure consistency, completeness, and the quality of the data produced, a methodology and procedures manual is being developed. This paper discusses the structure, assets, and operations of the FRMAC M ampersand A and the content and preparation of the manual

  19. Performance Assessment as a Diagnostic Tool for Science Teachers

    Science.gov (United States)

    Kruit, Patricia; Oostdam, Ron; van den Berg, Ed; Schuitema, Jaap

    2018-04-01

    Information on students' development of science skills is essential for teachers to evaluate and improve their own education, as well as to provide adequate support and feedback to the learning process of individual students. The present study explores and discusses the use of performance assessments as a diagnostic tool for formative assessment to inform teachers and guide instruction of science skills in primary education. Three performance assessments were administered to more than 400 students in grades 5 and 6 of primary education. Students performed small experiments using real materials while following the different steps of the empirical cycle. The mutual relationship between the three performance assessments is examined to provide evidence for the value of performance assessments as useful tools for formative evaluation. Differences in response patterns are discussed, and the diagnostic value of performance assessments is illustrated with examples of individual student performances. Findings show that the performance assessments were difficult for grades 5 and 6 students but that much individual variation exists regarding the different steps of the empirical cycle. Evaluation of scores as well as a more substantive analysis of students' responses provided insight into typical errors that students make. It is concluded that performance assessments can be used as a diagnostic tool for monitoring students' skill performance as well as to support teachers in evaluating and improving their science lessons.

  20. On-line fatigue monitoring and margins probabilistic assessment

    International Nuclear Information System (INIS)

    Fournier, I.; Morilhat, P.

    1993-01-01

    An on-line computer aided system has been developed by Electricite de France, the French utility, for a fatigue monitoring of critical locations in the nuclear steam supply system. This tool, called fatiguemeter, includes as input data only existing plant parameters and is based on some conservative assumptions at several steps of the damage assessment (thermal boundary conditions, stress computation...). This paper presents recent developments performed toward a better assessing of margins involved in the complete analysis. The methodology is enlightened with an example showing the influence of plant parameters incertitude on the final stress computed at a PWR 900 MW unit pressurizer surge line nozzle. (author)

  1. Extending role by Japanese pharmacists after training for performing vital signs monitoring

    Directory of Open Access Journals (Sweden)

    Hasegawa F

    2014-09-01

    Full Text Available Background: In Japan, the circumstances in which pharmacists work are changing. Pharmacists are expected to assess conditions of patients subject to medication to ensure proper use of pharmaceutical products. To ensure fulfilment of these roles, there have already been pharmacists’ efforts in performing vital signs monitoring. Objective: To clarify the necessity and related issues, by investigating the state of vital sign monitoring in clinical field by pharmacists who have been trained in vital sign monitoring. Method: A web survey was conducted from 4th October to 3rd December 2012, subjecting 1,026 pharmacists who completed the vital signs training hosted by The Japanese Association of Home Care Pharmacies (JAHCP. Survey items were 1 basic information of a respondent, 2 situation of homecare conducted by pharmacists, 3 seminar attendance status, and 4 vital signs monitoring status after the seminar. Results: The number of valid respondents was 430 and the response rate was 41.9%. As a result of the present research, it was revealed that 168 pharmacists (41.4%, had the opportunity to perform vital signs monitoring. By conducting vital sign monitoring, effects such as 1 improved motivation of pharmacists and better communication with patients, 2 proper use of medication, and 3 cost reduction were confirmed. Conclusion: Judging from the results of the survey, pharmacists can improve medication therapy for patients by attaining vital sign skills and conduct vital sign monitoring. Pharmacists who perform vital sign monitoring should share cases where they experienced positive patient outcomes.

  2. Performance audit procedures for opacity monitors

    International Nuclear Information System (INIS)

    Plaisance, S.J.; Peeler, J.W.

    1987-04-01

    This manual contains monitor-specific performance audit procedures and data forms for use in conducting audits of installed opacity continuous emission monitoring systems (CEMS). General auditing procedures and acceptance limits for various audit criteria are discussed. Practical considerations and common problems encountered in conducting audits are delineated, and recommendations are included to optimize the successful completion of performance audits. Performance audit procedures and field-data forms were developed for six common opacity CEMS: (1) Lear Siegler, Inc. Model RM-41; (2) Lear Siegler, Inc. Model RM-4; (3) Dynatron Model 1100; (4) Thermo Electron, Inc. Model 400; (5) Thermo Electron, Inc. Model 1000A; and (6) Enviroplan Model D-R280 AV. Generic audit procedures are included for use in evaluating opacity CEMS with multiple transmissometers and combiner devices. In addition, several approaches for evaluating the zero-alignment or clear-path zero response are described. The zero-alignment procedures are included since the factor is fundamental to the accuracy of opacity monitoring data, even though the zero-alignment checks cannot usually be conducted during a performance audit

  3. Assessing the value of structural health monitoring

    DEFF Research Database (Denmark)

    Thöns, S.; Faber, Michael Havbro

    2013-01-01

    Structural Health Monitoring (SHM) systems are designed for assisting owners and operators with information and forecasts concerning the fitness for purpose of structures and building systems. The benefit associated with the implementation of SHM may in some cases be intuitively anticipated...... as their responses and performances over their life-cycle. In addition, the quality of monitoring and the performance of possible remedial actions triggered by monitoring results are modeled probabilistically.The consequences accounted for, in principle include all consequences associated with the performance...

  4. Hybrid Modeling Improves Health and Performance Monitoring

    Science.gov (United States)

    2007-01-01

    Scientific Monitoring Inc. was awarded a Phase I Small Business Innovation Research (SBIR) project by NASA's Dryden Flight Research Center to create a new, simplified health-monitoring approach for flight vehicles and flight equipment. The project developed a hybrid physical model concept that provided a structured approach to simplifying complex design models for use in health monitoring, allowing the output or performance of the equipment to be compared to what the design models predicted, so that deterioration or impending failure could be detected before there would be an impact on the equipment's operational capability. Based on the original modeling technology, Scientific Monitoring released I-Trend, a commercial health- and performance-monitoring software product named for its intelligent trending, diagnostics, and prognostics capabilities, as part of the company's complete ICEMS (Intelligent Condition-based Equipment Management System) suite of monitoring and advanced alerting software. I-Trend uses the hybrid physical model to better characterize the nature of health or performance alarms that result in "no fault found" false alarms. Additionally, the use of physical principles helps I-Trend identify problems sooner. I-Trend technology is currently in use in several commercial aviation programs, and the U.S. Air Force recently tapped Scientific Monitoring to develop next-generation engine health-management software for monitoring its fleet of jet engines. Scientific Monitoring has continued the original NASA work, this time under a Phase III SBIR contract with a joint NASA-Pratt & Whitney aviation security program on propulsion-controlled aircraft under missile-damaged aircraft conditions.

  5. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  6. Simulated laparoscopy using a head-mounted display vs traditional video monitor: an assessment of performance and muscle fatigue.

    Science.gov (United States)

    Maithel, S K; Villegas, L; Stylopoulos, N; Dawson, S; Jones, D B

    2005-03-01

    The direction of visual gaze may be an important ergonomic factor that affects operative performance. We designed a study to determine whether a head-mounted display (HMD) worn by the surgeon would improve task performance and/or reduce muscle fatigue during a laparoscopic task when compared to the use of a traditional video monitor display (VMD). Surgical residents (n = 30) were enrolled in the study. A junior group, consisting of 15 postgraduate year (PGY) = 1 subjects with no previous laparoscopic experience, and a senior group, consisting of 15 PGY 4 and PGY 5 subjects with experience, completed a laparoscopic task that was repeated four times using the Computer Enhanced Laparoscopic Training System (CELTS). Groups alternated between using the HMD with the task placed in a downward frontal position and the VMD with the task at a 30 degrees lateral angle. The CELTS module assessed task completion time, depth perception, path length of instruments, response orientation, motion smoothness; the system then generated an overall score. Electromyography (EMG) was used to record sternocleidomastoid muscle activity. Display preference was surveyed. The senior residents performed better than the junior residents overall on all parameters (p < 0.05) except for motion smoothness, where there was no difference. In both groups, the HMD significantly improved motion smoothness when compared to the VMD (p < 0.05). All other parameters were equal. There was less muscle fatigue when using the VMD (p < 0.05). We found that 66% of the junior residents but only 20% of the senior residents preferred the HMD. The CELTS module demonstrated evidence of construct validity by differentiating the performances of junior and senior residents. By aligning the surgeon's visual gaze with the instruments, HMD improved smoothness of motion. Experienced residents preferred the traditional monitor display. Although the VMD produced less muscle fatigue, inexperienced residents preferred the HMD

  7. GEOGLAM Crop Monitor Assessment Tool: Developing Monthly Crop Condition Assessments

    Science.gov (United States)

    McGaughey, K.; Becker Reshef, I.; Barker, B.; Humber, M. L.; Nordling, J.; Justice, C. O.; Deshayes, M.

    2014-12-01

    The Group on Earth Observations (GEO) developed the Global Agricultural Monitoring initiative (GEOGLAM) to improve existing agricultural information through a network of international partnerships, data sharing, and operational research. This presentation will discuss the Crop Monitor component of GEOGLAM, which provides the Agricultural Market Information System (AMIS) with an international, multi-source, and transparent consensus assessment of crop growing conditions, status, and agro-climatic conditions likely to impact global production. This activity covers the four primary crop types (wheat, maize, rice, and soybean) within the main agricultural producing regions of the AMIS countries. These assessments have been produced operationally since September 2013 and are published in the AMIS Market Monitor Bulletin. The Crop Monitor reports provide cartographic and textual summaries of crop conditions as of the 28th of each month, according to crop type. This presentation will focus on the building of international networks, data collection, and data dissemination.

  8. Watertrak, a computerized liquid waste treatment system status and performance monitoring program

    International Nuclear Information System (INIS)

    Vance, J.N.; Tafazzoli, M.M.

    1984-01-01

    Because of continuing problems in the radwaste system operations of a large number of plants currently operating, there is an increasing need to provide greater quantities of radwaste system information to plant operators and managers. Current and more complete information is required to enhance the operation and performance of the radwaste treatment systems, to assess the current system status, to plan for changing plant conditions and to diagnose actual or impending problems. The information needs include: real-time system status monitoring, equipment performance monitoring, report generation for operators and plant management, and training information. The nature and quantity of information required makes this program well-suited for a computer-aided engineering application

  9. 5 CFR 430.207 - Monitoring performance.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Monitoring performance. 430.207 Section 430.207 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Appraisal for General Schedule, Prevailing Rate, and Certain Other Employees § 430.207...

  10. Performance Management and Monitoring of Internal Audit for the Public Sector in Romania

    Directory of Open Access Journals (Sweden)

    Elena Doina Dascălu

    2016-08-01

    Full Text Available Performance management is an on-going process, which has an essential component part, performance measurement, which involves the identification, supervision and communication of performance results, through the relation to a set of performance indicators. Based on the assessment results, corrective measures are established to ensure attainment of targeted results, offering a feedback, essential for the decision grounding enhancement, at all levels: strategic, operational or individual. As concerns performance management in public institutions in Romania, The Code on managerial internal control provides a hierarchy type model, in the framework of which, the head of the public entity, which is on the first level, needs to provide for performance monitoring for each objective and activity, through the intermediary of relevant quantitative and qualitative indicators, including referring to economy, efficiency, and effectiveness. Given the importance of the internal audit in the process of performance management, identifying solutions for continuous improvement of the public internal audit was subject to a study that was based on questioning public sector auditors on how to monitor the performance of public internal audit activity. Considering issues arising, the article proposes a series of directions for improving the monitoring of the performance of public internal audit activity in the public sector.

  11. Development of a monitoring instrument to assess the performance of the Swiss primary care system.

    Science.gov (United States)

    Ebert, Sonja T; Pittet, Valérie; Cornuz, Jacques; Senn, Nicolas

    2017-11-29

    The Swiss health system is customer-driven with fee-for-service paiement scheme and universal coverage. It is highly performing but expensive and health information systems are scarcely implemented. The Swiss Primary Care Active Monitoring (SPAM) program aims to develop an instrument able to describe the performance and effectiveness of the Swiss PC system. Based on a Literature review we developed a conceptual framework and selected indicators according to their ability to reflect the Swiss PC system. A two round modified RAND method with 24 inter-/national experts took place to select primary/secondary indicators (validity, clarity, agreement). A limited set of priority indicators was selected (importance, priority) in a third round. A conceptual framework covering three domains (structure, process, outcome) subdivided into twelve sections (funding, access, organisation/ workflow of resources, (Para-)Medical training, management of knowledge, clinical-/interpersonal care, health status, satisfaction of PC providers/ consumers, equity) was generated. 365 indicators were pre-selected and 335 were finally retained. 56 were kept as priority indicators.- Among the remaining, 199 were identified as primary and 80 as secondary indicators. All domains and sections are represented. The development of the SPAM program allowed the construction of a consensual instrument in a traditionally unregulated health system through a modified RAND method. The selected 56 priority indicators render the SPAM instrument a comprehensive tool supporting a better understanding of the Swiss PC system's performance and effectiveness as well as in identifying potential ways to improve quality of care. Further challenges will be to update indicators regularly and to assess validity and sensitivity-to-change over time.

  12. Environmental monitoring, restoration and assessment: What have we learned

    Energy Technology Data Exchange (ETDEWEB)

    Gray, R.H. (ed.)

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

  13. Environmental monitoring, restoration and assessment: What have we learned?

    International Nuclear Information System (INIS)

    Gray, R.H.

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort? How do we decide when enough monitoring is enough? Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes? Are current regulatory requirements too restrictive or too lenient? Can monitoring and assessment be made more cost effective? Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases

  14. Performance Assessment of a Class of Industrial Fans With ...

    African Journals Online (AJOL)

    This paper presents a statistical quality control study for on-condition monitoring of draught fans in a steelmaking process. The study proposes a procedure for obtaining consistent estimates of peak vibration levels for performance assessment the machines based on independent measurements of the variable assuming the ...

  15. Twelve tips for assessing surgical performance and use of technical assessment scales

    DEFF Research Database (Denmark)

    Strandbygaard, Jeanett; Scheele, Fedde; Sørensen, Jette Led

    2017-01-01

    Using validated assessment scales for technical competence can help structure and standardize assessment and feedback for both the trainee and the supervisor and thereby avoid bias and drive learning. Correct assessment of operative skills can establish learning curves and allow adequate monitoring....... However, the assessment of surgical performance is not an easy task, since it includes many proxy parameters, which are hard to measure. Although numerous technical assessment scales exist, both within laparoscopic and open surgery, the validity evidence is often sparse, and this can raise doubts about...... reliability and educational outcome. Furthermore, the implementation of technical assessment scales varies due to several obstacles and doubts about accurate use. In this 12-tips article, we aim to give the readers a critical and useful appraisal of some of the common questions and misunderstandings regarding...

  16. Completion of risk assessment and monitoring within forensic psychiatry.

    Science.gov (United States)

    Galappathie, Nuwan; Heeramun, Ragini; Jethwa, Krishma

    2009-04-01

    There is a clear need for high standards of risk assessment and monitoring within forensic psychiatry. This has been highlighted by a number of high profile homicide enquires which have called for better standards of multidisciplinary risk assessment and monitoring. There are no national standards for risk assessment. We conducted a study to audit electronically the completion rate of a service-designed risk assessment document within Fromside, a medium secure unit in the UK. The completion rates for key sections of 64 risk assessment documents were assessed. Only 48 of the 64 (75%) documents were electronically available. The completion rates ranged from 59/64 (92%) for the retrospective risk review to 46/64 (72%) for relapse indicators. Only 35/64 (55%) risk documents were updated within the last three months. We found that the use of risk profile documents has helped achieve good standards of risk assessment, however greater priority needs to be given to ongoing monitoring. We recommend that consideration is given to the development of national guidelines for multidisciplinary risk assessment and monitoring.

  17. Radioactivity monitor for high-performance liquid chromatography

    International Nuclear Information System (INIS)

    Reeve, D.R.; Crozier, A.

    1977-01-01

    The coupling of a homogeneous radioactivity monitor to a liquid chromatograph involves compromises between the sensitivity of the monitor and the resolution and speed of analysis of the chromatograph. The theoretical relationships between these parameters are considered and expressions derived which make it possible to calculate suitable monitor operating conditions for most types of high-performance liquid chromatography

  18. Risk monitor - a tool for operational safety assessment risk monitor - user's manual

    International Nuclear Information System (INIS)

    Hari Prasad, M.; Vinod, Gopika; Saraf, R.K.; Ghosh, A.K.

    2006-06-01

    Probabilistic Safety Assessment has become a key tool as on today to identify and understand Nuclear Power Plant vulnerabilities. As a result of the availability of these PSA studies, there is a desire to use them to enhance plant safety and to operate the nuclear stations in the most efficient manner. Risk Monitor is a PC based tool, which computes the real time safety level and assists plant personnel to manage day-to-day activities. Risk Monitor is a PC based user friendly software tool used for modification and re-analysis of a nuclear Power plant. Operation of Risk Monitor is based on PSA methods for assisting in day to day applications. Risk Monitoring programs can assess the risk profile and are used to optimize the operation of Nuclear Power Plants with respect to a minimum risk level over the operating time. This report presents the background activities of Risk Monitor, its application areas and the step by step procedure for the user.to interact with the software. This software can be used with the PSA model of any Nuclear Power Plant. (author)

  19. GPS Civil Monitoring Performance Specification

    Science.gov (United States)

    2009-02-10

    This Civil Monitoring Performance Specification (CMPS) is published and maintained at : the direction of the Program Manager for Civil Applications, Global Positioning Systems : Wing (GPSW). The purpose of this document is to provide a comprehensive ...

  20. Statistical analysis in MSW collection performance assessment.

    Science.gov (United States)

    Teixeira, Carlos Afonso; Avelino, Catarina; Ferreira, Fátima; Bentes, Isabel

    2014-09-01

    The increase of Municipal Solid Waste (MSW) generated over the last years forces waste managers pursuing more effective collection schemes, technically viable, environmentally effective and economically sustainable. The assessment of MSW services using performance indicators plays a crucial role for improving service quality. In this work, we focus on the relevance of regular system monitoring as a service assessment tool. In particular, we select and test a core-set of MSW collection performance indicators (effective collection distance, effective collection time and effective fuel consumption) that highlights collection system strengths and weaknesses and supports pro-active management decision-making and strategic planning. A statistical analysis was conducted with data collected in mixed collection system of Oporto Municipality, Portugal, during one year, a week per month. This analysis provides collection circuits' operational assessment and supports effective short-term municipality collection strategies at the level of, e.g., collection frequency and timetables, and type of containers. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Examining Big Brother's Purpose for Using Electronic Performance Monitoring

    Science.gov (United States)

    Bartels, Lynn K.; Nordstrom, Cynthia R.

    2012-01-01

    We examined whether the reason offered for electronic performance monitoring (EPM) influenced participants' performance, stress, motivation, and satisfaction. Participants performed a data-entry task in one of five experimental conditions. In one condition, participants were not electronically monitored. In the remaining conditions, participants…

  2. Real-time monitoring energy efficiency and performance degradation of condensing boilers

    International Nuclear Information System (INIS)

    Baldi, Simone; Quang, Thuan Le; Holub, Ondrej; Endel, Petr

    2017-01-01

    Highlights: • Fully-fledged set of fault detection and diagnosis tools for condensing boilers. • Detection of boiler performance degradation in condensing and noncondensing mode. • Virtual sensing for estimation of water mass flow rate. • Optimal Kalman detection of actuator and sensor faults. • Structural properties for detection and isolation of faults. - Abstract: Condensing boilers achieve higher efficiency than traditional boilers by using waste heat in flue gases to preheat cold return water entering the boiler. Water vapor produced during combustion is condensed into liquid form, thus recovering its latent heat of vaporization, leading to around 10–12% increased efficiency. Many countries have encouraged the use of condensing boilers with financial incentives. It is thus important to develop software tools to assess the correct functioning of the boiler and eventually detect problems. Current monitoring tools are based on boiler static maps and on large sets of historical data, and are unable to assess timely loss of performance due to degradation of the efficiency curve or water leakages. This work develops a set of fault detection and diagnosis tools for dynamic energy efficiency monitoring and assessment in condensing boilers, i.e. performance degradation and faults can be detected using real-time measurements: this real-time feature is particularly relevant because of the limited amount of data that can be stored by state-of-the-art building energy management systems. The monitoring tools are organized as follows: a bimodal parameter estimator to detect deviations of the efficiency of the boiler from nominal values in both condensing and noncondensing mode; a virtual sensor for the estimation of the water mass flow rate; filters to detect actuator and sensor faults, possibly due to control and sensing problems. Most importantly, structural properties for detection and isolation of actuators and sensing faults are given: these properties are

  3. Performance assessment of an onboard monitoring system for CMV drivers : a field operational test : research brief.

    Science.gov (United States)

    2016-11-01

    The primary goal of an onboard monitoring system (OBMS) is to enhance driver performance and safety. OBMSs are employed with the expectation that feedback provided concurrently (via flashing feedback lights in the vehicle) and cumulatively (via coach...

  4. Emergency radiological monitoring and analysis United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1994-01-01

    The United States Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. Following a major radiological incident the FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC). The FRMAC is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted states and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis and quality assurance. This program includes: (1) Aerial Radiological Monitoring - Fixed Wing and Helicopter, (2) Field Monitoring and Sampling, (3) Radioanalysis - Mobile and Fixed Laboratories, (4) Radiation Detection Instrumentation - Calibration and Maintenance, (5) Environmental Dosimetry, and (6) An integrated program of Quality Assurance. To assure consistency, completeness and the quality of the data produced, a methodology and procedures handbook is being developed. This paper discusses the structure, assets and operations of FRMAC monitoring and analysis and the content and preparation of this handbook

  5. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 1, Operations

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The Monitoring division is primarily responsible for the coordination and direction of: Aerial measurements to delineate the footprint of radioactive contaminants that have been released into the environment. Monitoring of radiation levels in the environment; Sampling to determine the extent of contaminant deposition in soil, water, air and on vegetation; Preliminary field analyses to quantify soil concentrations or depositions; and Environmental and personal dosimetry for FRMAC field personnel, during a Consequence Management Response Team (CMRT) and Federal Radiological Monitoring and Assessment Center (FRMAC) response. Monitoring and sampling techniques used during CM/FRMAC operations are specifically selected for use during radiological emergencies where large numbers of measurements and samples must be acquired, analyzed, and interpreted in the shortest amount of time possible. In addition, techniques and procedures are flexible so that they can be used during a variety of different scenarios; e.g., accidents involving releases from nuclear reactors, contamination by nuclear waste, nuclear weapon accidents, space vehicle reentries, or contamination from a radiological dispersal device. The Monitoring division also provides technicians to support specific Health and Safety Division activities including: The operation of the Hotline; FRMAC facility surveys; Assistance with Health and Safety at Check Points; and Assistance at population assembly areas which require support from the FRMAC. This volume covers deployment activities, initial FRMAC activities, development and implementation of the monitoring and assessment plan, the briefing of field teams, and the transfer of FRMAC to the EPA.

  6. Federal Radiological Monitoring and Assessment Center Phased Response Operations

    International Nuclear Information System (INIS)

    Riland, C.A.; Bowman, D.R.

    1999-01-01

    A Federal Radiological Monitoring and Assessment Center (FRMAC) is established in response to the Lead Federal Agency (LFA) or state request when a major radiological emergency is anticipated of has occurred. The FRMAC becomes a coalition of federal off-site monitoring and assessment activities to assist the LFA, state(s), local, and tribal authorities. State, local, and tribal authorities are invited to co-locate and prioritize monitoring and assessment efforts in the FRMAC. The Department of Energy is tasked by the Federal Radiological Emergency Response Plan to coordinate the FRMAC

  7. Monitoring endemic livestock diseases using laboratory diagnostic data: A simulation study to evaluate the performance of univariate process monitoring control algorithms.

    Science.gov (United States)

    Lopes Antunes, Ana Carolina; Dórea, Fernanda; Halasa, Tariq; Toft, Nils

    2016-05-01

    Surveillance systems are critical for accurate, timely monitoring and effective disease control. In this study, we investigated the performance of univariate process monitoring control algorithms in detecting changes in seroprevalence for endemic diseases. We also assessed the effect of sample size (number of sentinel herds tested in the surveillance system) on the performance of the algorithms. Three univariate process monitoring control algorithms were compared: Shewart p Chart(1) (PSHEW), Cumulative Sum(2) (CUSUM) and Exponentially Weighted Moving Average(3) (EWMA). Increases in seroprevalence were simulated from 0.10 to 0.15 and 0.20 over 4, 8, 24, 52 and 104 weeks. Each epidemic scenario was run with 2000 iterations. The cumulative sensitivity(4) (CumSe) and timeliness were used to evaluate the algorithms' performance with a 1% false alarm rate. Using these performance evaluation criteria, it was possible to assess the accuracy and timeliness of the surveillance system working in real-time. The results showed that EWMA and PSHEW had higher CumSe (when compared with the CUSUM) from week 1 until the end of the period for all simulated scenarios. Changes in seroprevalence from 0.10 to 0.20 were more easily detected (higher CumSe) than changes from 0.10 to 0.15 for all three algorithms. Similar results were found with EWMA and PSHEW, based on the median time to detection. Changes in the seroprevalence were detected later with CUSUM, compared to EWMA and PSHEW for the different scenarios. Increasing the sample size 10 fold halved the time to detection (CumSe=1), whereas increasing the sample size 100 fold reduced the time to detection by a factor of 6. This study investigated the performance of three univariate process monitoring control algorithms in monitoring endemic diseases. It was shown that automated systems based on these detection methods identified changes in seroprevalence at different times. Increasing the number of tested herds would lead to faster

  8. Preliminary Finding from a New Device for Monitoring Performance and Environmental Factors in the Field

    National Research Council Canada - National Science Library

    Lieberman, Harris

    2000-01-01

    .... This paper will introduce a new device, the U.S. Army Research Institute of Environmental Medicine vigilance monitor, which was developed for assessment of human performance in an automated, continuous manner in the field...

  9. Assessing the limitations of the Banister model in monitoring training

    Science.gov (United States)

    Hellard, Philippe; Avalos, Marta; Lacoste, Lucien; Barale, Frédéric; Chatard, Jean-Claude; Millet, Grégoire P.

    2006-01-01

    The aim of this study was to carry out a statistical analysis of the Banister model to verify how useful it is in monitoring the training programmes of elite swimmers. The accuracy, the ill-conditioning and the stability of this model were thus investigated. Training loads of nine elite swimmers, measured over one season, were related to performances with the Banister model. Firstly, to assess accuracy, the 95% bootstrap confidence interval (95% CI) of parameter estimates and modelled performances were calculated. Secondly, to study ill-conditioning, the correlation matrix of parameter estimates was computed. Finally, to analyse stability, iterative computation was performed with the same data but minus one performance, chosen randomly. Performances were significantly related to training loads in all subjects (R2= 0.79 ± 0.13, P < 0.05) and the estimation procedure seemed to be stable. Nevertheless, the 95% CI of the most useful parameters for monitoring training were wide τa =38 (17, 59), τf =19 (6, 32), tn =19 (7, 35), tg =43 (25, 61). Furthermore, some parameters were highly correlated making their interpretation worthless. The study suggested possible ways to deal with these problems and reviewed alternative methods to model the training-performance relationships. PMID:16608765

  10. Expert monitoring and verbal feedback as sources of performance pressure.

    Science.gov (United States)

    Buchanan, John J; Park, Inchon; Chen, Jing; Mehta, Ranjana K; McCulloch, Austin; Rhee, Joohyun; Wright, David L

    2018-05-01

    The influence of monitoring-pressure and verbal feedback on the performance of the intrinsically stable bimanual coordination patterns of in-phase and anti-phase was examined. The two bimanual patterns were produced under three conditions: 1) no-monitoring, 2) monitoring-pressure (viewed by experts), and 3) monitoring-pressure (viewed by experts) combined with verbal feedback emphasizing poor performance. The bimanual patterns were produced at self-paced movement frequencies. Anti-phase coordination was always less stable than in-phase coordination across all three conditions. When performed under conditions 2 and 3, both bimanual patterns were performed with less variability in relative phase across a wide range of self-paced movement frequencies compared to the no-monitoring condition. Thus, monitoring-pressure resulted in performance stabilization rather than degradation and the presence of verbal feedback had no impact on the influence of monitoring pressure. The current findings are inconsistent with the predictions of explicit monitoring theory; however, the findings are consistent with studies that have revealed increased stability for the system's intrinsic dynamics as a result of attentional focus and intentional control. The results are discussed within the contexts of the dynamic pattern theory of coordination, explicit monitoring theory, and action-focused theories as explanations for choking under pressure. Copyright © 2018. Published by Elsevier B.V.

  11. Performance Health Monitoring of Large-Scale Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rajamony, Ram [IBM Research, Austin, TX (United States)

    2014-11-20

    This report details the progress made on the ASCR funded project Performance Health Monitoring for Large Scale Systems. A large-­scale application may not achieve its full performance potential due to degraded performance of even a single subsystem. Detecting performance faults, isolating them, and taking remedial action is critical for the scale of systems on the horizon. PHM aims to develop techniques and tools that can be used to identify and mitigate such performance problems. We accomplish this through two main aspects. The PHM framework encompasses diagnostics, system monitoring, fault isolation, and performance evaluation capabilities that indicates when a performance fault has been detected, either due to an anomaly present in the system itself or due to contention for shared resources between concurrently executing jobs. Software components called the PHM Control system then build upon the capabilities provided by the PHM framework to mitigate degradation caused by performance problems.

  12. Performance assessment

    International Nuclear Information System (INIS)

    Doe, T.

    1985-01-01

    The purpose of performance assessment is to show that the repository is expected to serve its stated function - disposing of radioactive waste safely both during operation and for the postclosure period. Performance assessment is a straightforward concept, but its application may be very complicated. The concept of performance assessment has been clarified by the Nuclear Regulatory Commission (NRC) in their Draft Generic Technical Position on Licensing Assessment Methodology for High-Level Waste Geologic Repositories (NRC, 1984). This document has gone a long way toward defining the criteria that the NRC will use to determine whether or not information from site characterization is adequate to meet the regulations of the Nuclear Regulatory Commission and the Environmental Protection Agency (EPA). A favorable determination is required for issuance of a construction authorization, which is the first major regulatory requirement for developing a working repository. It is, therefore, essential that a research program be developed that not only resolves the outstanding technical issues, but also does it in such a way that the results are clearly applicable to the formal performance assessment and licensing procedures. The definitions of performance assessment are reviewed and the current NRC thinking is summarized

  13. Systems engineering approach towards performance monitoring of emergency diesel generator

    International Nuclear Information System (INIS)

    Nurhayati Ramli; Lee, Y.K.

    2013-01-01

    Full-text: Systems engineering is an interdisciplinary approach and means to enable the realization of successful systems. In this study, systems engineering approach towards the performance monitoring of Emergency Diesel Generator (EDG) is presented. Performance monitoring is part and parcel of predictive maintenance where the systems and components conditions can be detected before they result into failures. In an effort to identify the proposal for addressing performance monitoring, the EDG boundary has been defined. Based on the Probabilistic Safety Analysis (PSA) results and industry operating experiences, the most critical component is identified. This paper proposed a systems engineering concept development framework towards EDG performance monitoring. The expected output of this study is that the EDG reliability can be improved by the performance monitoring alternatives through the systems engineering concept development effort. (author)

  14. Radiation safety assessment and development of environmental radiation monitoring technology

    CERN Document Server

    Choi, B H; Kim, S G

    2002-01-01

    The Periodic Safety Review(PSR) of the existing nuclear power plants is required every ten years according to the recently revised atomic energy acts. The PSR of Kori unit 1 and Wolsong unit 1 that have been operating more than ten years is ongoing to comply the regulations. This research project started to develop the techniques necessary for the PSR. The project developed the following four techniques at the first stage for the environmental assessment of the existing plants. 1) Establishment of the assessment technology for contamination and accumulation trends of radionuclides, 2) alarm point setting of environmental radiation monitoring system, 3) Development of Radiation Safety Evaluation Factor for Korean NPP, and 4) the evaluation of radiation monitoring system performance and set-up of alarm/warn set point. A dynamic compartment model to derive a relationship between the release rates of gas phase radionuclides and the concentrations in the environmental samples. The model was validated by comparing ...

  15. Electronic Monitoring Systems to Assess Urinary Incontinence: A Health Technology Assessment.

    Science.gov (United States)

    2018-01-01

    Urinary incontinence is involuntary leakage of urine and can affect people of all ages. Incidence rises as people age, often because of reduced mobility or conditions affecting the nervous system, such as dementia and stroke. Urinary incontinence can be a distressing condition and can harm a person's physical, financial, social, and emotional well-being. People with urinary incontinence are susceptible to skin irritation, pressure sores, and urinary tract infections. Urinary incontinence is also associated with an increased risk of falls in older adults.This health technology assessment examined the effectiveness of, budget impact of, and patient values and preferences about electronic monitoring systems to assess urinary incontinence for residents of long-term care homes or geriatric hospital inpatients with complex conditions. A clinical evidence review of the published clinical literature was conducted to June 9, 2017. Critical appraisal of the clinical evidence included assessment of risk of bias and the Grading of Recommendations Assessment, Development, and Evaluation (GRADE) Working Group criteria to reflect the certainty of the evidence.We calculated the funding required for an electronic urinary incontinence monitoring system in the first year of implementation (when facilities would buy the systems) and in subsequent years.We interviewed six people with urinary incontinence and two caregivers, who described ways urinary incontinence affected daily life. We included one observational study in the clinical review. Most of the 31 participants in the observational study were female (78%) and required high levels of care, primarily because of cognitive impairment. The quality of evidence for all outcomes was very low owing to potential risk of bias and indirectness. We are consequently uncertain about how electronic monitoring systems affect management of urinary incontinence.For patients living in long-term care homes who are eligible for the technology, we

  16. Benchmarking DNA Metabarcoding for Biodiversity-Based Monitoring and Assessment

    KAUST Repository

    Aylagas, Eva

    2016-06-10

    Characterization of biodiversity has been extensively used to confidently monitor and assess environmental status. Yet, visual morphology, traditionally and widely used for species identification in coastal and marine ecosystem communities, is tedious and entails limitations. Metabarcoding coupled with high-throughput sequencing (HTS) represents an alternative to rapidly, accurately, and cost-effectively analyze thousands of environmental samples simultaneously, and this method is increasingly used to characterize the metazoan taxonomic composition of a wide variety of environments. However, a comprehensive study benchmarking visual and metabarcoding-based taxonomic inferences that validates this technique for environmental monitoring is still lacking. Here, we compare taxonomic inferences of benthic macroinvertebrate samples of known taxonomic composition obtained using alternative metabarcoding protocols based on a combination of different DNA sources, barcodes of the mitochondrial cytochrome oxidase I gene and amplification conditions. Our results highlight the influence of the metabarcoding protocol in the obtained taxonomic composition and suggest the better performance of an alternative 313 bp length barcode to the traditionally 658 bp length one used for metazoan metabarcoding. Additionally, we show that a biotic index inferred from the list of macroinvertebrate taxa obtained using DNA-based taxonomic assignments is comparable to that inferred using morphological identification. Thus, our analyses prove metabarcoding valid for environmental status assessment and will contribute to accelerating the implementation of this technique to regular monitoring programs.

  17. Benchmarking DNA Metabarcoding for Biodiversity-Based Monitoring and Assessment

    KAUST Repository

    Aylagas, Eva; Borja, Á ngel; Irigoien, Xabier; Rodrí guez-Ezpeleta, Naiara

    2016-01-01

    Characterization of biodiversity has been extensively used to confidently monitor and assess environmental status. Yet, visual morphology, traditionally and widely used for species identification in coastal and marine ecosystem communities, is tedious and entails limitations. Metabarcoding coupled with high-throughput sequencing (HTS) represents an alternative to rapidly, accurately, and cost-effectively analyze thousands of environmental samples simultaneously, and this method is increasingly used to characterize the metazoan taxonomic composition of a wide variety of environments. However, a comprehensive study benchmarking visual and metabarcoding-based taxonomic inferences that validates this technique for environmental monitoring is still lacking. Here, we compare taxonomic inferences of benthic macroinvertebrate samples of known taxonomic composition obtained using alternative metabarcoding protocols based on a combination of different DNA sources, barcodes of the mitochondrial cytochrome oxidase I gene and amplification conditions. Our results highlight the influence of the metabarcoding protocol in the obtained taxonomic composition and suggest the better performance of an alternative 313 bp length barcode to the traditionally 658 bp length one used for metazoan metabarcoding. Additionally, we show that a biotic index inferred from the list of macroinvertebrate taxa obtained using DNA-based taxonomic assignments is comparable to that inferred using morphological identification. Thus, our analyses prove metabarcoding valid for environmental status assessment and will contribute to accelerating the implementation of this technique to regular monitoring programs.

  18. ASSESSMENT OF CABLE AGING USING CONDITION MONITORING TECHNIQUES

    International Nuclear Information System (INIS)

    GROVE, E.; LOFARO, R.; SOO, P.; VILLARAN, M.; HSU, F.

    2000-01-01

    Electric cables in nuclear power plants suffer degradation during service as a result of the thermal and radiation environments in which they are installed. Instrumentation and control cables are one type of cable that provide an important role in reactor safety. Should the polymeric cable insulation material become embrittled and cracked during service, or during a loss-of-coolant-accident (LOCA) and when steam and high radiation conditions are anticipated, failure could occur and prevent the cables from fulfilling their intended safety function(s). A research program is being conducted at Brookhaven National Laboratory to evaluate condition monitoring (CM) techniques for estimating the amount of cable degradation experienced during in-plant service. The objectives of this program are to assess the ability of the cables to perform under a simulated LOCA without losing their ability to function effectively, and to identify CM techniques which may be used to determine the effective lifetime of cables. The cable insulation materials tested include ethylene propylene rubber (EPR) and cross-linked polyethylene (XLPE). Accelerated aging (thermal and radiation) to the equivalent of 40 years of service was performed, followed by exposure to simulated LOCA conditions. The effectiveness of chemical, electrical, and mechanical condition monitoring techniques are being evaluated. Results indicate that several of these methods can detect changes in material parameters with increasing age. However, each has its limitations, and a combination of methods may provide an effective means for trending cable degradation in order to assess the remaining life of cables

  19. Selection of monitoring times to assess remediation performance

    Energy Technology Data Exchange (ETDEWEB)

    Kueper, B.H.; Mundle, K. [Queen' s Univ., Kingston, ON (Canada). Dept. of Civil Engineering, Geoengineering Centre

    2007-07-01

    Several factors determine the time needed for a plume to respond to non-aqueous phase liquid (NAPL) source zone remediation. Most spills of NAPLs (fuels, chlorinated solvents, PCB oils, creosote and coal tar) require mass removal in order to implement remediation technologies such as chemical oxidation, thermal treatments, alcohol flushing, surfactant flushing and hydraulic displacement. While much attention has been given to the development of these remediation technologies, little attention has been given to the response of the plume downstream of the treatment zone and selection of an appropriate monitoring time scale to adequately evaluate the impacts of remediation. For that reason, this study focused on the prevalence of diffusive sinks, the mobility of the contaminant and the hydraulic conductivity of subsurface materials. Typically, plumes in subsurface environments dominated by diffusive sinks or low permeability materials need long periods of time to detach after source removal. This paper presented generic plume response model simulations that illustrated concentration rebound following the use of in-situ chemical oxidation in fractured clay containing trichloroethylene. It was determined that approximately 2 years are needed to reach peak rebound concentration after cessation remedial action. It was concluded that downgradient monitoring well concentrations may be greatly reduced during remedial action due to the fact that oxidant occupies the fracture and because oxidant diffuses into the clay matrix, creating a short period of contaminant reduction in the area of flowing groundwater. 9 refs., 2 tabs., 7 figs.

  20. Selection of monitoring times to assess remediation performance

    International Nuclear Information System (INIS)

    Kueper, B.H.; Mundle, K.

    2007-01-01

    Several factors determine the time needed for a plume to respond to non-aqueous phase liquid (NAPL) source zone remediation. Most spills of NAPLs (fuels, chlorinated solvents, PCB oils, creosote and coal tar) require mass removal in order to implement remediation technologies such as chemical oxidation, thermal treatments, alcohol flushing, surfactant flushing and hydraulic displacement. While much attention has been given to the development of these remediation technologies, little attention has been given to the response of the plume downstream of the treatment zone and selection of an appropriate monitoring time scale to adequately evaluate the impacts of remediation. For that reason, this study focused on the prevalence of diffusive sinks, the mobility of the contaminant and the hydraulic conductivity of subsurface materials. Typically, plumes in subsurface environments dominated by diffusive sinks or low permeability materials need long periods of time to detach after source removal. This paper presented generic plume response model simulations that illustrated concentration rebound following the use of in-situ chemical oxidation in fractured clay containing trichloroethylene. It was determined that approximately 2 years are needed to reach peak rebound concentration after cessation remedial action. It was concluded that downgradient monitoring well concentrations may be greatly reduced during remedial action due to the fact that oxidant occupies the fracture and because oxidant diffuses into the clay matrix, creating a short period of contaminant reduction in the area of flowing groundwater. 9 refs., 2 tabs., 7 figs

  1. Imaging assessment of a portable hemodialysis device: detection of possible failure modes and monitoring of functional performance.

    Science.gov (United States)

    Olorunsola, Olufoladare G; Kim, Steven H; Chang, Ryan; Kuo, Yuo-Chen; Hetts, Steven W; Heller, Alex; Kant, Rishi; Saeed, Maythem; Fissell, William H; Roy, Shuvo; Wilson, Mark W

    2014-03-27

    The purpose of this study was to investigate the utility and limitations of various imaging modalities in the noninvasive assessment of a novel compact hemodialyzer under development for renal replacement therapy, with specific aim towards monitoring its functional performance. The prototype is a 4×3×6 cm aluminum cartridge housing "blood" and "dialysate" flow paths arranged in parallel. A sheet of semipermeable silicon nanopore membranes forms the blood-dialysate interface, allowing passage of small molecules. Blood flow was simulated using a peristaltic pump to instill iodinated contrast through the blood compartment, while de-ionized water was instilled through the dialysate compartment at a matched rate in the countercurrent direction. Images were acquired under these flow conditions using multi-detector computed tomography (MDCT), fluoroscopy, high-resolution quantitative computed tomography (HR-QCT), and magnetic resonance imaging (MRI). MDCT was used to monitor contrast diffusion efficiency by plotting contrast density as a function of position along the path of flow through the cartridge during steady state infusion at 1 and 20 mL/min. Both linear and exponential regressions were used to model contrast decay along the flow path. Both linear and exponential models of contrast decay appeared to be reasonable approximations, yielding similar results for contrast diffusion during a single pass through the cartridge. There was no measurable difference in contrast diffusion when comparing 1 mL/min and 20 mL/min flow rates. Fluoroscopy allowed a gross qualitative assessment of flow within the device, and revealed flow inhomogeneity within the corner of the cartridge opposite the blood inlet port. MRI and HR-QCT were both severely limited due to the paramagnetic properties and high atomic number of the target material, respectively. During testing, we encountered several causes of device malfunction, including leak formation, trapped gas, and contrast

  2. Radiological assessments, environmental monitoring, and study design

    International Nuclear Information System (INIS)

    Hansen, W.R.; Elle, D.R.

    1980-01-01

    Studies of the behavior of transuranic elements in the environment form the basic data for applied programs in radiological assessment, environmental monitoring, derivation of radiation-protection standards, and environmental impact statements. This chapter introduces some of the major information requirements of these applications of transuranic research data. Characteristics of the source terms from nuclear activities usually are needed for an analysis of environmental pathways or deployment of monitoring systems. Major inhalation and ingestion pathways are considered in assessments of hazards from transuranics and are discussed from the viewpoint of research needed

  3. Multidimensional Monitoring of Recovery Status and Implications for Performance.

    Science.gov (United States)

    Heidari, Jahan; Beckmann, Jürgen; Bertollo, Maurizio; Brink, Michel; Kallus, Wolfgang; Robazza, Claudio; Kellmann, Michael

    2018-03-15

    Monitoring of recovery in the context of athletic performance has gained significant importance during recent years. As a systematic process of data collection and evaluation, the monitoring of recovery can be implemented for various purposes. It may aid to prevent negative outcomes of training or competition, such as underrecovery, overtraining, or injuries. Further, it aims at establishing routines and strategies necessary to guarantee athletes' readiness for performance by restoring their depleted resources. Comprehensive monitoring of recovery ideally encompasses a multidimensional approach, thereby considering biological, psychological, and social monitoring methods. From a biological perspective, physiological (e.g., cardiac parameters), biochemical (e.g., creatine kinase), hormonal (e.g., salivary cortisol) and immunological (e.g., immunoglobulin A) markers can be taken into account to operationalize training loads and recovery needs. Psychological approaches suggest the application of validated and reliable psychometric questionnaires (e.g., Recovery-Stress Questionnaire for Athletes) to measure a subjective perception of recovery as well as the subjective degree of training- or competition-induced fatigue. Social aspects also play a role in performance monitoring and may hence provide essential performance-related information. The implementation of a monitoring routine within athletic environments represents a continuous process which functions as an effective addition to training and depends on a range of conditions (e.g., organizational regulations, commitment of athletes). Current research in the field of monitoring aims at establishing individualized monitoring regimes that are referring to intraindividual reference values with the help of innovative technological devices.

  4. Integrated monitoring and assessment of soil restoration treatments in the Lake Tahoe Basin.

    Science.gov (United States)

    Grismer, M E; Schnurrenberger, C; Arst, R; Hogan, M P

    2009-03-01

    Revegetation and soil restoration efforts, often associated with erosion control measures on disturbed soils, are rarely monitored or otherwise evaluated in terms of improved hydrologic, much less, ecologic function and longer term sustainability. As in many watersheds, sediment is a key parameter of concern in the Tahoe Basin, particularly fine sediments less than about ten microns. Numerous erosion control measures deployed in the Basin during the past several decades have under-performed, or simply failed after a few years and new soil restoration methods of erosion control are under investigation. We outline a comprehensive, integrated field-based evaluation and assessment of the hydrologic function associated with these soil restoration methods with the hypothesis that restoration of sustainable function will result in longer term erosion control benefits than that currently achieved with more commonly used surface treatment methods (e.g. straw/mulch covers and hydroseeding). The monitoring includes cover-point and ocular assessments of plant cover, species type and diversity; soil sampling for nutrient status; rainfall simulation measurement of infiltration and runoff rates; cone penetrometer measurements of soil compaction and thickness of mulch layer depths. Through multi-year hydrologic and vegetation monitoring at ten sites and 120 plots, we illustrate the results obtained from the integrated monitoring program and describe how it might guide future restoration efforts and monitoring assessments.

  5. The link between performance assessment and quality of data

    International Nuclear Information System (INIS)

    Csullog, G.W.

    1990-11-01

    Performance assessments, using both individual and cumulative inventories, produce estimates of the risk or dose consequences for repository concepts. Unacceptable risk or dose for a given contaminant identify it as a problem contaminant. While risk or dose consequences are common outputs of safety assessments, results can also be reported as estimates of the safe inventory limit for each contaminant in a repository scenario. Once problem contaminants are identified, it may be useful to: validate the data used in the performance assessment; restrict contaminant inventories in the repository; or, improve the containment capability of the repository (including improved packaging). A key point is that performance assessments define the quality of data to be collected. If a contaminant's inventory will be far below its estimated safe inventory limit for a repository, then it is reasonable to accept inventory estimates that have high variances and low confidence. For contaminants that have a significant impact upon performance assessments, efforts must be made to provide the best inventory (source term) estimates practicable. One important goal of characterization programs should be to establish the adequacy of data used in performance assessments. There is little value in striving to improve confidence in data for some waste streams if they are assessed to have a minor impact upon repository performance. Streams that have a major impact upon performance deserve the time, attention and money to be characterized adequately. Waste acceptance must be linked to the quality of characterization data provided by generators. This link sets compliance monitoring requirements

  6. Condenser performance monitoring and cleaning

    International Nuclear Information System (INIS)

    Walden, J.V.

    1998-01-01

    The main condenser at Ginna Station was retubed from admiralty brass to 316 stainless steel. A condenser performance monitoring spreadsheet was developed using EPRI guidelines after fouling was discovered. PEPSE computer models were used to determine the power loss and confirm the spreadsheet results. Cleaning of the condenser was performed using plastic scrubbers. Condenser performance improved dramatically following the cleaning. PEPSE, condenser spreadsheet performance, and actual observed plant data correlated well together. The fouling mechanism was determined to be a common lake bacteria and fungus growth which was combined with silt. Chlorination of the circulating water system at the allowable limits is keeping the biofouling under control

  7. Impact of an in-built monitoring system on family planning performance in rural Bangladesh

    Directory of Open Access Journals (Sweden)

    Ashraf Ali

    2007-06-01

    Full Text Available Abstract Background During 1982–1992, the Maternal and Child Health Family Planning (MCH-FP Extension Project (Rural of International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B, in partnership with the Ministry of Health and Family Welfare (MoHFW of the Government of Bangladesh (GoB, implemented a series of interventions in Sirajganj Sadar sub-district of Sirajganj district. These interventions were aimed at improving the planning mechanisms and for reviewing the problem-solving processes to build an effective monitoring system of the interventions at the local level of the overall system of the MOHFW, GoB. Methods The interventions included development and testing of innovative solutions in service-delivery, provision of door-step injectables, and strengthening of the management information system (MIS. The impact of an in-built monitoring system on the overall performance was assessed during the period from June 1995 to December 1996, after the withdrawal of the interventions in 1992. Results The results of the assessment showed that Family Welfare Assistants (FWAs increased household-visits within the last two months, and there was a higher use of service-delivery points even after the withdrawal of the interventions. The results of the cluster surveys, conducted in 1996, showed that the selected indicators of health and family-planning services were higher than those reported by the Bangladesh Demographic and Health Survey (BDHS 1996–1997. During June 1995-December, 1996, the contraceptive prevalence rate (CPR increased by 13 percentage points (i.e. from 40% to 53%. Compared to the national CPR (49%, this increase was statistically significant (p Conclusion The in-built monitoring systems, including effective MIS, accompanied by rapid assessments and review of performance by the programme managers, have potentials to improve family planning performance in low-performing areas.

  8. Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    2000-01-01

    The plan for maintaining the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (PA) is described. The plan includes expected work on PA reviews and revisions, waste reports, monitoring, other operational activities, etc

  9. Seismic Monitoring To Assess Performance Of Structures In Near-Real Time: Recent Progress

    International Nuclear Information System (INIS)

    Celebi, Mehmet

    2008-01-01

    Earlier papers have described how observed data from classical accelerometers deployed in structures or from differential GPS with high sampling ratios deployed at roofs of tall buildings can be configured to establish seismic health monitoring of structures. In these configurations, drift ratios 1 are the main parametric indicator of damage condition of a structure or component of a structure.Real-time measurement of displacements are acquired either by double integration of accelerometer time-series data, or by directly using GPS. Recorded sensor data is then related to the performance level of a building. Performance-based design method stipulates that for a building the amplitude of relative displacement of the roof of a building (with respect to its base) indicates its performance.Usually, drift ratio is computed using relative displacement between two consecutive floors. When accelerometers are used, a specific software is used to compute displacements and drift ratios in realtime by double integration of accelerometer data from several floors. However, GPS-measured relative displacements are limited to being acquired only at the roof with respect to its reference base. Thus, computed drift ratio is the average drift ratio for the whole building. Until recently, the validity of measurements using GPS was limited to long-period structures (T>1 s) because GPS systems readily available were limited to 10-20 samples per seconds (sps) capability. However, presently, up to 50 sps differential GPS systems are available on the market and have been successfully used to monitor drift ratios [1,2]--thus enabling future usefulness of GPS to all types of structures. Several levels of threshold drift ratios can be postulated in order to make decisions for inspections and/or occupancy.Experience with data acquired from both accelerometers and GPS deployments indicates that they are reliable and provide pragmatic alternatives to alert the owners and other authorized parties

  10. Strategies of performance self-monitoring in automotive production.

    Science.gov (United States)

    Faye, Hélène; Falzon, Pierre

    2009-09-01

    Production in the automotive industry, based on assembly line work, is now characterized by lean manufacturing and customization. This results in greater flexibility and increased quality demands, including worker performance self-monitoring. The objectives of this study are to refine the concept of performance self-monitoring and to characterize the strategies developed by operators to achieve it. Data were collected based on the method of individual auto-confrontation, consisting of two steps: eleven assembly-line operators of a French automotive company were individually observed and video-taped while they were working; an interview then allowed each operator to discuss his/her activity based on the video-tape. This study expands the concept of performance self-monitoring by highlighting three types of strategies directly oriented toward quality: prevention, feedback control and control action strategies.

  11. Behavioral and electrophysiological evidence of enhanced performance monitoring in meditators

    NARCIS (Netherlands)

    Andreu, C.I.; Moënne-Loccoz, C.; López, V.; Slagter, H.A.; Franken, I.H.A.; Cosmelli, D.

    2017-01-01

    Performance monitoring—the ability to monitor ongoing performance to detect and correct errors—is a core component of cognitive control. Impairments in performance monitoring have been associated with several psychiatric disorders, including attention deficit hyperactivity disorder and substance use

  12. 296-B-10 stack monitoring and sampling system annual system assessment report

    International Nuclear Information System (INIS)

    Ridge, T.M.

    1995-01-01

    B Plant Administration Manual, requires an annual system assessment to evaluate and report the present condition of the sampling and monitoring system associated with stack 296-B-10 at B Plant. The ventilation system of WESF (Waste Encapsulation and Storage Facility) is designed to provide airflow patterns so that air movement throughout the building is from areas of lesser radioactivity to areas of greater radioactivity. All potentially contaminated areas are maintained at a negative pressure with respect to the atmosphere so that air flows into the building at all times. The exhaust discharging through the 296-B-10 stack is continuously monitored and sampled using a sampling and monitoring probe assembly located approximately 17.4 meters (57 feet) above the base of the stack. The probe assembly consists of 5 nozzles for the sampling probe and 2 nozzles to monitor the flow. The sampling and monitoring system associated with Stack 296-B-10 is functional and performing satisfactorily

  13. On-line fatigue monitoring and probabilistic assessment of margins

    Energy Technology Data Exchange (ETDEWEB)

    Fournier, I. [Electricite de France, 93 - Saint-Denis (France). Direction des Etudes et Recherches; Morilhat, P. [Electricite de France, 93 - Saint-Denis (France). Direction des Etudes et Recherches

    1995-01-01

    An on-line computer-aided system has been developed by Electricite de France, the French utility, for fatigue monitoring of critical locations in the nuclear steam supply system. This tool, called a fatigue meter, includes as input data plant parameters and is based on some conservative assumptions at several steps of the damage assessment (thermal boundary conditions, stress computation,..). In this paper we present recent developments performed towards a better assessment of margins involved in the complete analysis. The methodology is illustrated with an example showing the influence of uncertainty in plant parameters on the final stress computed at a pressurized water reactor 900MW unit pressurizer surge line nozzle. A second example is shown to illustrate the possibility of defining some transient archetypes. ((orig.)).

  14. 14 CFR 152.319 - Monitoring and reporting of program performance.

    Science.gov (United States)

    2010-01-01

    ... performance. 152.319 Section 152.319 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.319 Monitoring and reporting of program performance. (a) The sponsor or planning agency shall monitor performance...

  15. Runtime Performance Monitoring Tool for RTEMS System Software

    Science.gov (United States)

    Cho, B.; Kim, S.; Park, H.; Kim, H.; Choi, J.; Chae, D.; Lee, J.

    2007-08-01

    RTEMS is a commercial-grade real-time operating system that supports multi-processor computers. However, there are not many development tools for RTEMS. In this paper, we report new RTEMS-based runtime performance monitoring tool. We have implemented a light weight runtime monitoring task with an extension to the RTEMS APIs. Using our tool, software developers can verify various performance- related parameters during runtime. Our tool can be used during software development phase and in-orbit operation as well. Our implemented target agent is light weight and has small overhead using SpaceWire interface. Efforts to reduce overhead and to add other monitoring parameters are currently under research.

  16. Who can monitor the court interpreter's performance?

    DEFF Research Database (Denmark)

    Martinsen, Bodil

    2009-01-01

    and the conflict about her competence was negotiated. Because of this unusual constellation, combined with a multi-method approach, this single case study can shed some light on the question of the participants' ability to monitor the interpreter's performance. Legal professional users of interpreters tend......  Who can monitor the court interpreter's performance? Results of a case study This paper presents the results of a case study of an unusual interpreting event in a Danish courtroom setting. During the trial, the interpreter's non-normative performance was explicitly criticised by the audience...... are far less transparent for the legal participants than they normally assume. This problem, in turn, stresses the importance of a) the interpreter's competence and self-awareness and b) the use of check interpreters.  ...

  17. Performance monitoring and analysis of task-based OpenMP.

    Directory of Open Access Journals (Sweden)

    Yi Ding

    Full Text Available OpenMP, a typical shared memory programming paradigm, has been extensively applied in high performance computing community due to the popularity of multicore architectures in recent years. The most significant feature of the OpenMP 3.0 specification is the introduction of the task constructs to express parallelism at a much finer level of detail. This feature, however, has posed new challenges for performance monitoring and analysis. In particular, task creation is separated from its execution, causing the traditional monitoring methods to be ineffective. This paper presents a mechanism to monitor task-based OpenMP programs with interposition and proposes two demonstration graphs for performance analysis as well. The results of two experiments are discussed to evaluate the overhead of monitoring mechanism and to verify the effects of demonstration graphs using the BOTS benchmarks.

  18. Monitoring performance using synthetic data for induced microseismicity by hydrofracking at the Wysin site (Poland)

    Science.gov (United States)

    López-Comino, J. A.; Cesca, S.; Kriegerowski, M.; Heimann, S.; Dahm, T.; Mirek, J.; Lasocki, S.

    2017-07-01

    Ideally, the performance of a dedicated seismic monitoring installation should be assessed prior to the observation of target seismicity. This work is focused on a hydrofracking experiment monitored at Wysin, NE Poland. A microseismic synthetic catalogue is generated to assess the monitoring performance during the pre-operational phase, where seismic information only concerns the noise conditions and the potential background seismicity. Full waveform, accounting for the expected spatial, magnitude and focal mechanism distributions and a realistic local crustal model, are combined with real noise recording to produce either event based or continuous synthetic waveforms. The network detection performance is assessed in terms of the magnitude of completeness (Mc) through two different techniques. First, we use an amplitude threshold, taking into the ratio among the maximal amplitude of synthetic waveforms and station-dependent noise levels, for different values of signal-to-noise ratio. The detection probability at each station is estimated for the whole data set and extrapolated to a broader range of magnitude and distances. We estimate an Mc of about 0.55, when considering the distributed network, and can further decrease Mc to 0.45 using arrays techniques. The second approach, taking advantage on an automatic, coherence-based detection algorithm, can lower Mc to ∼ 0.1, at the cost of an increase of false detections. Mc experiences significant changes during day hours, in consequence of strongly varying noise conditions. Moreover, due to the radiation patterns and network geometry, double-couple like sources are better detected than tensile cracks, which may be induced during fracking.

  19. Perfmon2: a leap forward in performance monitoring

    International Nuclear Information System (INIS)

    Jarp, S; Jurga, R; Nowak, A

    2008-01-01

    This paper describes the software component, perfmon2, that is about to be added to the Linux kernel as the standard interface to the Performance Monitoring Unit (PMU) on common processors, including x86 (AMD and Intel), Sun SPARC, MIPS, IBM Power and Intel Itanium. It also describes a set of tools for doing performance monitoring in practice and details how the CERN openlab team has participated in the testing and development of these tools

  20. Perfmon2: a leap forward in performance monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Jarp, S; Jurga, R; Nowak, A [CERN, Geneva (Switzerland)], E-mail: Sverre.Jarp@cern.ch

    2008-07-15

    This paper describes the software component, perfmon2, that is about to be added to the Linux kernel as the standard interface to the Performance Monitoring Unit (PMU) on common processors, including x86 (AMD and Intel), Sun SPARC, MIPS, IBM Power and Intel Itanium. It also describes a set of tools for doing performance monitoring in practice and details how the CERN openlab team has participated in the testing and development of these tools.

  1. Perfmon2 a leap forward in performance monitoring

    CERN Document Server

    Jarp, S; Nowak, A

    2008-01-01

    This paper describes the software component, perfmon2, that is about to be added to the Linux kernel as the standard interface to the Performance Monitoring Unit (PMU) on common processors, including x86 (AMD and Intel), Sun SPARC, MIPS, IBM Power and Intel Itanium. It also describes a set of tools for doing performance monitoring in practice and details how the CERN openlab team has participated in the testing and development of these tools.

  2. Perfmon2: a leap forward in performance monitoring

    Science.gov (United States)

    Jarp, S.; Jurga, R.; Nowak, A.

    2008-07-01

    This paper describes the software component, perfmon2, that is about to be added to the Linux kernel as the standard interface to the Performance Monitoring Unit (PMU) on common processors, including x86 (AMD and Intel), Sun SPARC, MIPS, IBM Power and Intel Itanium. It also describes a set of tools for doing performance monitoring in practice and details how the CERN openlab team has participated in the testing and development of these tools.

  3. Performance monitoring in lung cancer patients pre- and post-chemotherapy using fine-grained electrophysiological measures

    Directory of Open Access Journals (Sweden)

    M. Simó

    Full Text Available No previous event-related potentials (ERPs study has explored the error-related negativity (ERN - an ERP component indexing performance monitoring - associated to cancer and chemotherapy-induced cognitive impairment in a lung cancer population. The aim of this study was to examine differences in performance monitoring in a small-cell lung cancer group (SCLC, C+ 1-month following chemotherapy and two control groups: a non-small cell lung cancer patient group (NSCLC, C− prior to chemotherapy and a healthy control group (HC.Seventeen SCLC (C+ underwent a neuropsychological assessment and an ERP study using a flanker and a stop-signal paradigm. This group was compared to fifteen age-, gender- and education-matched NSCLC (C− and eighteen HC.Between 20 and 30% of patients in both lung cancer groups (C+ and C− met criteria for cognitive impairment. Concerning ERPs, lung cancer patients showed lower overall hit rate and a severe ERN amplitude reduction compared to HC.Lung cancer patients exhibited an abnormal pattern of performance monitoring thus suggesting that chemotherapy and especially cancer itself, may contribute to cognitive deterioration. ERN appeared as an objective laboratory tool sensitive to cognitive dysfunction in cancer population. Keywords: Event-related potentials-ERP, Error-related negativity (ERN, Performance monitoring, Lung cancer, Cognitive impairment, Chemobrain

  4. Alignment performance monitoring for ASML systems

    Science.gov (United States)

    Chung, Woong-Jae; Temchenko, Vlad; Hauck, Tarja; Schmidt, Sebastian

    2006-03-01

    In today's semiconductor industry downscaling of the IC design puts a stringent requirement on pattern overlay control. Tighter overlay requirements lead to exceedingly higher rework rates, meaning additional costs to manufacturing. Better alignment control became a target of engineering efforts to decrease rework rate for high-end technologies. Overlay performance is influenced by known parameters such as "Shift, Scaling, Rotation, etc", and unknown parameters defined as "Process Induced Variation", which are difficult to control by means of a process automation system. In reality, this process-induced variation leads to a strong wafer to wafer, or lot to lot variation, which are not easy to detect in the mass-production environment which uses sampling overlay measurements for only several wafers in a lot. An engineering task of finding and correcting a root cause for Process Induced Variations of overlay performance will be greatly simplified if the unknown parameters could be tracked for each wafer. This paper introduces an alignment performance monitoring method based on analysis of automatically generated "AWE" files for ASML scanner systems. Because "AWE" files include alignment results for each aligned wafer, it is possible to use them for monitoring, controlling and correcting the causes of "process induced" overlay performance without requiring extra measurement time. Since "AWE" files include alignment information for different alignment marks, it is also possible to select and optimize the best alignment recipe for each alignment strategy. Several case studies provided in our paper will demonstrate how AWE file analysis can be used to assist engineer in interpreting pattern alignment data. Since implementing our alignment data monitoring method, we were able to achieve significant improvement of alignment and overlay performance without additional overlay measurement time. We also noticed that the rework rate coming from alignment went down and

  5. Supplemental Assessment of the Y-12 Groundwater Protection Program Using Monitoring and Remediation Optimization System Software

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental LLC; GSI Environmental LLC

    2009-01-01

    A supplemental quantitative assessment of the Groundwater Protection Program (GWPP) at the Y-12 National Security Complex (Y-12) in Oak Ridge, TN was performed using the Monitoring and Remediation Optimization System (MAROS) software. This application was previously used as part of a similar quantitative assessment of the GWPP completed in December 2005, hereafter referenced as the 'baseline' MAROS assessment (BWXT Y-12 L.L.C. [BWXT] 2005). The MAROS software contains modules that apply statistical analysis techniques to an existing GWPP analytical database in conjunction with hydrogeologic factors, regulatory framework, and the location of potential receptors, to recommend an improved groundwater monitoring network and optimum sampling frequency for individual monitoring locations. The goal of this supplemental MAROS assessment of the Y-12 GWPP is to review and update monitoring network optimization recommendations resulting from the 2005 baseline report using data collected through December 2007. The supplemental MAROS assessment is based on the findings of the baseline MAROS assessment and includes only the groundwater sampling locations (wells and natural springs) currently granted 'Active' status in accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP). The results of the baseline MAROS assessment provided technical rationale regarding the 'Active' status designations defined in the MOP (BWXT 2006). One objective of the current report is to provide a quantitative review of data collected from Active but infrequently sampled wells to confirm concentrations at these locations. This supplemental MAROS assessment does not include the extensive qualitative evaluations similar to those presented in the baseline report.

  6. Digital Image Correlation for Performance Monitoring

    Science.gov (United States)

    Palaviccini, Miguel; Turner, Dan; Herzberg, Michael

    2016-01-01

    Evaluating the health of a mechanism requires more than just a binary evaluation of whether an operation was completed. It requires analyzing more comprehensive, full-field data. Health monitoring is a process of non-destructively identifying characteristics that indicate the fitness of an engineered component. In order to monitor unit health in a production setting, an automated test system must be created to capture the motion of mechanism parts in a real-time and non-intrusive manner. One way to accomplish this is by using high-speed video and Digital Image Correlation (DIC). In this approach, individual frames of the video are analyzed to track the motion of mechanism components. The derived performance metrics allow for state-of-health monitoring and improved fidelity of mechanism modeling. The results are in-situ state-of-health identification and performance prediction. This paper introduces basic concepts of this test method, and discusses two main themes: the use of laser marking to add fiducial patterns to mechanism components, and new software developed to track objects with complex shapes, even as they move behind obstructions. Finally, the implementation of these tests into an automated tester is discussed.

  7. 40 CFR 52.1080 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... Stations (PAMS) Program. 52.1080 Section 52.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 52.1080 Photochemical Assessment Monitoring Stations (PAMS) Program. On March 24, 1994 Maryland's... Assessment Monitoring Stations (PAMS) Program as a state implementation plan (SIP) revision, as required by...

  8. 40 CFR 52.2426 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... Stations (PAMS) Program. 52.2426 Section 52.2426 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 52.2426 Photochemical Assessment Monitoring Stations (PAMS) Program. On November 23, 1994 Virginia's... Photochemical Assessment Monitoring Stations (PAMS) Program as a state implementation plan (SIP) revision, as...

  9. Comparison of 3MP medical-grade to 1MP office grade LCD monitors in mammographic diagnostic and perceptual performance

    International Nuclear Information System (INIS)

    Ong, Aaron; Tan, Shu.; Gledhill, Samuel; Hennessy, Oliver; Lui, Belinda; Lee, Alan; Lemish, Wayne; Styles, Colin; Pun, Emma; Padmanabhan, Meenakshi; Pitman, Alexander G.; Tauro, Paul; Waugh, Paul

    2011-01-01

    Full text: Picture archiving and communication systems images designed to be viewed on high-resolution medical-grade monitors are routinely viewed on office-grade monitors on the wards or at home. This study aimed to determine whether a statistically significant difference in diagnostic (cancer detection) and perceptual (microcalcification detection) performance exists between 3MP grade and 1MP office-grade monitors. 3MP Dome medical-grade liquid crystal display (LCD) monitors (Planar, Beaverton, OR, USA) were compared to 1MP Dell office-grade LCD monitors (Dell Inc, Round Rock, TX, USA). Eight radiologists (reader experi ence 8-30 years) read the same set of 100 mammograms (23/100 with proven cancers and 52/100 with microcalcifications) presented in random order on three occasions separated by two time intervals of 12 weeks. Reads 1 and 3 utilised 3MP monitors and formed the baseline read. Read 2 utilised 1MP monitors and constituted the experimental read. Reading conditions were standardised. Readers were aware of which monitors they were using. Mul tivariate logistic regression analysis (to account for reader variability and monitor impact) was performed to assess for statistical significance. At a = 5%, confidence intervals analysis comparing the measured parameters between 1MP to 3MP monitors demonstrated no statistically significant difference in diagnostic and perceptual performance for the reader group. In cancer detection (the diagnostic task), reader accuracy remained high irrespective of monitor type. Regression analysis comparing performance with 1MP against 3MP monitors found P values of 0.693 and 0.324 for diagnostic and perceptual performance, respectively. There were no statistically and clinically significant differences between 3MP and 1MP monitors in mammographic diagnostic and perceptual performance. Comparable performance may be due to compensatory behav iour by readers.

  10. Performing Probabilistic Risk Assessment Through RAVEN

    Energy Technology Data Exchange (ETDEWEB)

    A. Alfonsi; C. Rabiti; D. Mandelli; J. Cogliati; R. Kinoshita

    2013-06-01

    The Reactor Analysis and Virtual control ENviroment (RAVEN) code is a software tool that acts as the control logic driver and post-processing engine for the newly developed Thermal-Hydraulic code RELAP-7. RAVEN is now a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities: Derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures), allowing on-line monitoring/controlling in the Phase Space Perform both Monte-Carlo sampling of random distributed events and Dynamic Event Tree based analysis Facilitate the input/output handling through a Graphical User Interface (GUI) and a post-processing data mining module

  11. Digital Heart-Rate Variability Parameter Monitoring and Assessment ASIC.

    Science.gov (United States)

    Massagram, W; Hafner, N; Mingqi Chen; Macchiarulo, L; Lubecke, V M; Boric-Lubecke, O

    2010-02-01

    This paper describes experimental results for an application-specific integrated circuit (ASIC), designed for digital heart rate variability (HRV) parameter monitoring and assessment. This ASIC chip measures beat-to-beat (RR) intervals and stores HRV parameters into its internal memory in real time. A wide range of short-term and long-term ECG signals obtained from Physionet was used for testing. The system detects R peaks with millisecond accuracy, and stores up to 2 min of continuous RR interval data and up to 4 min of RR interval histogram. The prototype chip was fabricated in a 0.5 ¿m complementary metal-oxide semiconductor technology on a 3×3 mm(2) die area, with a measured dynamic power consumption of 10 ¿W and measured leakage current of 2.62 nA. The HRV monitoring system including this HRV ASIC, an analog-to-digital converter, and a low complexity microcontroller was estimated to consume 32.5 ¿V, which is seven times lower power than a stand-alone microcontroller performing the same functions. Compact size, low cost, and low power consumption make this chip suitable for a miniaturized portable HRV monitoring system.

  12. Radiation Measurements Laboratory (RML) calibration and assessment of the ATR SPING-3 stack effluent monitor

    International Nuclear Information System (INIS)

    Koeppen, L.D.; Rogers, J.W.; Simpson, O.D.

    1983-12-01

    An evaluation, calibration and assessment of the Eberline SPING-3 ATR stack effluent monitor was conducted. This unit which monitors particulate, iodine and noble gas effluents was producing abnormal results following the initial installation and operational testing. The purposes of this work were to find the causes of the abnormal results and correct them if possible; check the calibrations and adjust them if necessary; and to provide a better in-depth understanding of what the unit is monitoring and how well it performs under this application. Results have shown that there were some problems associated with the unit as initially installed and tested. These problems have been identified and suggested alternatives shown, the monitor was found to be applicable to some extent under the current conditions. The calibrations have been checked and adjustments made. More operation testing and evaluation is needed to assess how well this works under a variety of ATR operating conditions. 2 references, 10 figures, 3 tables

  13. Computer-aided performance monitoring program at Diablo Canyon

    International Nuclear Information System (INIS)

    Nelson, T.; Glynn, R. III; Kessler, T.C.

    1992-01-01

    This paper describes the thermal performance monitoring program at Pacific Gas ampersand Electric Company's (PG ampersand E's) Diablo Canyon Nuclear Power Plant. The plant performance monitoring program at Diablo Canyon uses the THERMAC performance monitoring and analysis computer software provided by Expert-EASE Systems. THERMAC is used to collect performance data from the plant process computers, condition that data to adjust for measurement errors and missing data points, evaluate cycle and component-level performance, archive the data for trend analysis and generate performance reports. The current status of the program is that, after a fair amount of open-quotes tuningclose quotes of the basic open-quotes thermal kitclose quotes models provided with the initial THERMAC installation, we have successfully baselined both units to cycle isolation test data from previous reload cycles. Over the course of the past few months, we have accumulated enough data to generate meaningful performance trends and, as a result, have been able to use THERMAC to track a condenser fouling problem that was costing enough megawatts to attract corporate-level attention. Trends from THERMAC clearly related the megawatt loss to a steadily degrading condenser cleanliness factor and verified the subsequent gain in megawatts after the condenser was cleaned. In the future, we expect to rebaseline THERMAC to a beginning of cycle (BOC) data set and to use the program to help track feedwater nozzle fouling

  14. Quality assessment of patients’ self-monitoring of blood glucose in community pharmacies

    Directory of Open Access Journals (Sweden)

    Kjome RL

    2010-03-01

    Full Text Available Objective: To evaluate diabetes patients’ self-monitoring of blood glucose using a community pharmacy-based quality assurance procedure, to investigate whether the procedure improved the quality of the patient performance of self monitoring of blood glucose, and to examine the opinions of the patients taking part in the study. Methods: The results of patient blood glucose measurements were compared to the results obtained with HemoCue Glucose 201+ by pharmacy employees in 16 Norwegian community pharmacies. Patient performance was monitored using an eight item checklist. Patients whose blood glucose measurements differed from pharmacy measurements by more than 20% were instructed in the correct use of their glucometer. The patients then re-measured their blood glucose. If the results were still outside the set limits, the control procedure was repeated with a new lot of glucometer strips, and then with a new glucometer. The patients returned for a follow-up visit after three months. Results: During the first visit, 5% of the 338 patients had measurements that deviated from pharmacy blood glucose values by more than 20% and user errors were observed for 50% of the patients. At the second visit, there was no significant change in the analytical quality of patient measurements, but the percentage of patients who made user errors had decreased to 29% (p < 0.001. Eighty-five percent of the patients reported that they used their blood glucose results to adjust medication, exercise or meals. Fifty-one percent of the patients reported a greater trust in their measurements after the second visit. Eighty percent of patients wished to have their measurements assessed yearly. Of these patients, 83% preferred to have the assessment done at the community pharmacy. Conclusion: A community pharmacy-based quality assessment procedure of patients’ self monitoring of blood glucose significantly reduced the number of user errors. The analytical quality of the

  15. Environmental radiation exposure: Regulation, monitoring, and assessment

    International Nuclear Information System (INIS)

    Chen, S.Y.; Yu, C.; Hong, K.J.

    1991-01-01

    Radioactive releases to the environment from nuclear facilities constitute a public health concern. Protecting the public from such releases can be achieved through the establishment and enforcement of regulatory standards. In the United States, numerous standards have been promulgated to regulate release control at nuclear facilities. Most recent standards are more restrictive than those in the past and require that radioactivity levels be as low as reasonably achievable (ALARA). Environmental monitoring programs and radiological dose assessment are means of ensuring compliance with regulations. Environmental monitoring programs provide empirical information on releases, such as the concentrations of released radioactivity in environmental media, while radiological dose assessment provides the analytical means of quantifying dose exposures for demonstrating compliance

  16. Fast Flux Test Facility performance monitoring management information

    International Nuclear Information System (INIS)

    Newland, D.J.

    1987-11-01

    The purpose of this report is to provide performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. This report contains the results for key performance indicators divided into two categories of ''overall'' and ''other''. The ''overall'' performance indicators, when considered in the aggregate, provide one means of monitoring overall plant performance

  17. YUCSA: A CLIPS expert database system to monitor academic performance

    Science.gov (United States)

    Toptsis, Anestis A.; Ho, Frankie; Leindekar, Milton; Foon, Debra Low; Carbonaro, Mike

    1991-01-01

    The York University CLIPS Student Administrator (YUCSA), an expert database system implemented in C Language Integrated Processing System (CLIPS), for monitoring the academic performance of undergraduate students at York University, is discussed. The expert system component in the system has already been implemented for two major departments, and it is under testing and enhancement for more departments. Also, more elaborate user interfaces are under development. We describe the design and implementation of the system, problems encountered, and immediate future plans. The system has excellent maintainability and it is very efficient, taking less than one minute to complete an assessment of one student.

  18. The Advanced Monitoring Systems Initiative--Performance Monitoring for DOE Environmental Remediation and Contaminant Containment

    Science.gov (United States)

    Haas, W. J.; Venedam, R. J.; Lohrstorfer, C. F.; Weeks, S. J.

    2005-05-01

    The Advanced Monitoring System Initiative (AMSI) is a new approach to accelerate the development and application of advanced sensors and monitoring systems in support of Department of Energy needs in monitoring the performance of environmental remediation and contaminant containment activities. The Nevada Site Office of the National Nuclear Security Administration (NNSA) and Bechtel Nevada manage AMSI, with funding provided by the DOE Office of Environmental Management (DOE EM). AMSI has easy access to unique facilities and capabilities available at the Nevada Test Site (NTS), including the Hazardous Materials (HazMat) Spill Center, a one-of-a-kind facility built and permitted for releases of hazardous materials for training purposes, field-test detection, plume dispersion experimentation, and equipment and materials testing under controlled conditions. AMSI also has easy access to the facilities and considerable capabilities of the DOE and NNSA National Laboratories, the Special Technologies Laboratory, Remote Sensing Laboratory, Desert Research Institute, and Nevada Universities. AMSI provides rapid prototyping, systems integration, and field-testing, including assistance during initial site deployment. The emphasis is on application. Important features of the AMSI approach are: (1) customer investment, involvement and commitment to use - including definition of needs, desired mode of operation, and performance requirements; and (2) employment of a complete systems engineering approach, which allows the developer to focus maximum attention on the essential new sensing element or elements while AMSI assumes principal responsibility for infrastructure support elements such as power, packaging, and general data acquisition, control, communication, visualization and analysis software for support of decisions. This presentation describes: (1) the needs for sensors and performance monitoring for environmental systems as seen by the DOE Long Term Stewardship Science and

  19. System and Method for Monitoring Piezoelectric Material Performance

    Science.gov (United States)

    Moses, Robert W. (Inventor); Fox, Christopher L. (Inventor); Fox, Melanie L. (Inventor); Chattin, Richard L. (Inventor); Shams, Qamar A. (Inventor); Fox, Robert L. (Inventor)

    2007-01-01

    A system and method are provided for monitoring performance capacity of a piezoelectric material that may form part of an actuator or sensor device. A switch is used to selectively electrically couple an inductor to the piezoelectric material to form an inductor-capacitor circuit. Resonance is induced in the inductor-capacitor circuit when the switch is operated to create the circuit. The resonance of the inductor-capacitor circuit is monitored with the frequency of the resonance being indicative of performance capacity of the device's piezoelectric material.

  20. Guidance on the implementation of a risk based safety performance monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Sewell, R.T.; Kuritzky, A.S.; Khatib-Rahbar, M.

    1997-05-01

    The principal objective of the present study is to review and evaluate existing Performance Indicator (PI) monitoring programs, and to develop and demonstrate an overall PSA-based methodology and framework for the monitoring and use of risk-based PIs and SIs (Safety Indicator), that would enable: Identification of trends and patterns in safety performance at a specific plant and a population of plants; Assessment of the significance of the trends and patterns; Identification of precursors of accident sequences and safety reductions; Identification of the most critical functional areas of concern, especially as they relate to a defense-in-depth safety philosophy; Comparison of safety performance trends at a plant with those at comparable plants; Incorporation of the PIs and SIs into a risk- and performance-based decision process. To support the overall project objective, it is important that information needs and data collection procedures are clearly outlined. Of key significance in this regard is the premise that a performance monitoring system should not be burdened by an excessive number of low-level PIs that may have only a peripheral relationship to safety. Other supporting objectives of the study include: To identify and discuss other issues pertaining to the practical implementation of a safety performance monitoring system (outlining the databases and algorithms needed); and to demonstrate implementation of the preliminary guidance for monitoring and use of the selected set of PIs and SIs, within the proposed framework, via application to the operating history of a NPP having a PSA and readily available event data

  1. Experimental Adaptive Digital Performance Monitoring for Optical DP-QPSK Coherent Receiver

    DEFF Research Database (Denmark)

    Borkowski, Robert; Zhang, Xu; Zibar, Darko

    2011-01-01

    We report on a successful experimental demonstration of a digital optical performance monitoring (OPM) yielding satisfactory estimation accuracy along with adaptive impairment equalization. No observable penalty is measured when equalizer is driven by monitoring module.......We report on a successful experimental demonstration of a digital optical performance monitoring (OPM) yielding satisfactory estimation accuracy along with adaptive impairment equalization. No observable penalty is measured when equalizer is driven by monitoring module....

  2. Performance Monitoring and Evaluation in Botswana’s Public Service: Achievements and Challenges

    Directory of Open Access Journals (Sweden)

    Dorothy Mpabanga

    2016-03-01

    Full Text Available The paper aims to explore the implementation of performance monitoring and evaluation tools used in Botswana’s public service. The paper also identifies achievements and challenges of implementing performance monitoring and evaluation system and suggests ways for improvement. This paper uses secondary data sources. The paper reveals lack of performance monitoring and evaluation skills, poor supervision, poor conditions of service and a poor work ethic as some of the factors contributing to ineffective use of performance monitoring and evaluation tools in the service. Leadership commitment and support, benchmarking reforms, training and education, developed administrative and governance structures as well as well-defined public policy and program formulation and implementation processes are some of the success factors to enhanced performance management and evaluation systems in Botswana. The paper argues for adoption of a developmental-led model in order to enhance existing performance monitoring and evaluation system that would improve implementation of government policies and programs. Botswana has been striving to excel in service delivery through performance monitoring and evaluation oriented reforms.

  3. New monitoring technology to objectively assess adherence to prescribed footwear and assistive devices during ambulatory activity.

    Science.gov (United States)

    Bus, Sicco A; Waaijman, Roelof; Nollet, Frans

    2012-11-01

    To assess the validity and feasibility of a new temperature-based adherence monitor to measure footwear use. Observational study. University medical center and participants' homes. Convenience sample of healthy subjects (n=11) and neuropathic diabetic patients at high risk for foot ulceration (n=14). In healthy subjects, the validity of the in-shoe attached adherence monitor was investigated by comparing its registrations of donning and doffing of footwear during 7 days to an accurately kept log registration. In diabetic patients, the feasibility of using the adherence monitor for 7 days in conjunction with a time-synchronized ankle-worn step activity monitor to register prescribed footwear use during walking was assessed. Furthermore, a usability questionnaire was completed. For validity, the mean time difference and 95% confidence interval (CI) between moments of donning/doffing footwear recorded with the adherence monitor and in the log were calculated. For feasibility, technical performance, usability, and the percentage of steps that the footwear was worn (adherence) were assessed. The mean time difference between the adherence monitor and log recordings was 0.4 minutes (95% CI, 0.2-0.6min). One erroneous recording and 2 incomplete recordings were obtained in diabetic patients. Three patients reported discomfort with the step activity monitor, and 4 patients would not favor repeated testing. Patients used their footwear for between 9% and 99% of their walking steps. The adherence monitor shows good validity in measuring when footwear is used or not, and is, together with instrumented monitoring of walking activity, a feasible and objective method to assess treatment adherence. This method can have wide application in clinical practice and research regarding prescribed footwear and other body-worn assistive devices. Copyright © 2012 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  4. Optical Performance Monitoring and Signal Optimization in Optical Networks

    DEFF Research Database (Denmark)

    Petersen, Martin Nordal

    2006-01-01

    The thesis studies performance monitoring for the next generation optical networks. The focus is on all-optical networks with bit-rates of 10 Gb/s or above. Next generation all-optical networks offer large challenges as the optical transmitted distance increases and the occurrence of electrical-optical......-electrical regeneration points decreases. This thesis evaluates the impact of signal degrading effects that are becoming of increasing concern in all-optical high-speed networks due to all-optical switching and higher bit-rates. Especially group-velocity-dispersion (GVD) and a number of nonlinear effects will require...... enhanced attention to avoid signal degradations. The requirements for optical performance monitoring features are discussed, and the thesis evaluates the advantages and necessity of increasing the level of performance monitoring parameters in the physical layer. In particular, methods for optical...

  5. Monitoring needs to perform ecological risk assessments in Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Kraeuchi, N.

    1999-07-01

    There is enormous pressure to come up with answers to questions asked by politicians and the public concerning the development of the environment and the potential risks society might be confronted with. Forests for example are expected to fulfill specific functions (e.g., timber production, protection of soil and water resources, recreation). As the environmental and social context itself is rapidly changing it is unknown what uses of a forest will appear in the future. The changing social and ecological context under which forestry operates is therefore calling for an appropriate management mode to deal with uncertainties. There is a need to act, monitor the results, learn from the past, adapt to new conditions through planning and to accept a philosophy of managing an ecosystem with the purpose of reducing potential future socio-ecological and environmental risk by understanding potential problems before they arise. Thus, ecosystem-based management must follow established ecological principles and appropriate guidelines must be derived from a thorough understanding of the origin of the risks potentially threatening the forests and the relevant ecosystem processes. In order to evaluate the likelihood that adverse ecological effects may occur as a result of exposure to one or more stressors long-term monitoring data, information, assumptions and uncertainties need to be systematically evaluated and analyzed. This is needed to understand and predict the relationships between stressors and ecological effects in a way that is useful for environmental decision making.

  6. Performance test of personal RF monitor for area monitoring at magnetic confinement fusion facility

    International Nuclear Information System (INIS)

    Tanaka, M.; Uda, T.; Wang, J.; Fujiwara, O.

    2012-01-01

    For safety management at a magnetic confinement fusion-test facility, protection from not only ionising radiation, but also non-ionising radiation such as the leakage of static magnetic and electromagnetic fields is an important issue. Accordingly, the use of a commercially available personal RF monitor for multipoint area monitoring is proposed. In this study, the performance of both fast- and slow-type personal RF monitors was investigated by using a transverse electromagnetic cell system. The range of target frequencies was between 10 and 300 MHz, corresponding to the ion cyclotron range of frequency in a fusion device. The personal RF monitor was found to have good linearity, frequency dependence and isotropic response. However, the time constant for the electric field sensor of the slow-type monitor was much longer than that for the fast-type monitor. Considering the time-varying field at the facility, it is found that the fast-type monitor is suitable for multipoint monitoring at magnetic confinement fusion test facilities. (authors)

  7. Standard guide for in-plant performance evaluation of automatic pedestrian SNM monitors

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1997-01-01

    1.1 This guide is affiliated with Guide C1112 on special nuclear material (SNM) monitors, Guide C1169 on laboratory performance evaluation, and Guide C1189 on calibrating pedestrian SNM monitors. This guide to in-plant performance evaluation is a comparatively rapid way to verify whether a pedestrian SNM monitor performs as expected for detecting SNM or SNM-like test sources. 1.1.1 In-plant performance evaluation should not be confused with the simple daily functional test recommended in Guide C1112. In-plant performance evaluation takes place less often than daily tests, usually at intervals ranging from weekly to once every three months. In-plant evaluations are also more extensive than daily tests and may examine both a monitor's nuisance alarm record and its detection sensitivity for a particular SNM or alternative test source. 1.1.2 In-plant performance evaluation also should not be confused with laboratory performance evaluation. In-plant evaluation is comparatively rapid, takes place in the monitor...

  8. Monitoring SLAC High Performance UNIX Computing Systems

    International Nuclear Information System (INIS)

    Lettsome, Annette K.

    2005-01-01

    Knowledge of the effectiveness and efficiency of computers is important when working with high performance systems. The monitoring of such systems is advantageous in order to foresee possible misfortunes or system failures. Ganglia is a software system designed for high performance computing systems to retrieve specific monitoring information. An alternative storage facility for Ganglia's collected data is needed since its default storage system, the round-robin database (RRD), struggles with data integrity. The creation of a script-driven MySQL database solves this dilemma. This paper describes the process took in the creation and implementation of the MySQL database for use by Ganglia. Comparisons between data storage by both databases are made using gnuplot and Ganglia's real-time graphical user interface

  9. Bridge condition assessment based on long-term strain monitoring

    Science.gov (United States)

    Sun, LiMin; Sun, Shouwang

    2011-04-01

    In consideration of the important role that bridges play as transportation infrastructures, their safety, durability and serviceability have always been deeply concerned. Structural Health Monitoring Systems (SHMS) have been installed to many long-span bridges to provide bridge engineers with the information needed in making rational decisions for maintenance. However, SHMS also confronted bridge engineers with the challenge of efficient use of monitoring data. Thus, methodologies which are robust to random disturbance and sensitive to damage become a subject on which many researches in structural condition assessment concentrate. In this study, an innovative probabilistic approach for condition assessment of bridge structures was proposed on the basis of long-term strain monitoring on steel girder of a cable-stayed bridge. First, the methodology of damage detection in the vicinity of monitoring point using strain-based indices was investigated. Then, the composition of strain response of bridge under operational loads was analyzed. Thirdly, the influence of temperature and wind on strains was eliminated and thus strain fluctuation under vehicle loads is obtained. Finally, damage evolution assessment was carried out based on the statistical characteristics of rain-flow cycles derived from the strain fluctuation under vehicle loads. The research conducted indicates that the methodology proposed is qualified for structural condition assessment so far as the following respects are concerned: (a) capability of revealing structural deterioration; (b) immunity to the influence of environmental variation; (c) adaptability to the random characteristic exhibited by long-term monitoring data. Further examination of the applicability of the proposed methodology in aging bridge may provide a more convincing validation.

  10. The Southern and Eastern Africa Consortium for Monitoring Educational Quality. Assessment GEMs No. 8

    Science.gov (United States)

    Australian Council for Educational Research, 2015

    2015-01-01

    The Southern and Eastern Africa Consortium for Monitoring Educational Quality (SACMEQ) carries out large-scale cross-national research studies in member countries in the Southern and Eastern Africa region. It aims to assess the conditions of schooling and performance levels of learners and teachers in the areas of literacy and numeracy. SACMEQ has…

  11. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  12. PingER: Internet performance monitoring -- How do collisions make better physics

    International Nuclear Information System (INIS)

    Matthews, W.

    2000-01-01

    Internet connectivity is critical infrastructure for modern high energy nuclear and particle physics experiments at laboratories around the world. Achieving the ambitious computing goals is dependent on reliable and fast connections between collaborators in geographically separate regions. The ambitious computing goals of experiments such as BaBar, RHIC and the LHC place internet connectivity in a highly critical position. More over the ability to monitor performance and identify weak points for upgrades has become pivotal to recruiting collaborators not only overseas from the location of the experiment but in locations previously considered remote. The methodology of the Internet End-to-End Performance Monitoring (IEPM) project and long-term trends in regional and trans-oceanic performance measured by the PingER tools has previously been described. The project has grown significantly and now 593 nodes at 424 sites in 72 countries are monitored by 28 monitoring sites in 15 countries. A total of 2,138 end-to-end pairs are monitored, making PingER probably the largest performance monitoring project in the world. Recently particular effort has been made to extend the monitoring of locations in East Europe and the former USSR and to Central and South America and the Middle East, reflecting the increasing reach of high energy nuclear and particle physics research

  13. Real-time monitoring through the use of technology to enhance performances throughout HIV cascades.

    Science.gov (United States)

    Avery, Matthew; Mills, Stephen J; Stephan, Eric

    2017-09-01

    Controlling the HIV epidemic requires strong linkages across a 'cascade' of prevention, testing, and treatment services. Information and communications technology (ICT) offers the potential to monitor and improve the performance of this HIV cascade in real time. We assessed recent (media to expand reach and improve programmatic targeting; technology in healthcare settings to strengthen coordination, guide clinical decision-making and improve clinical interactions; and telephone-based follow-up to improve treatment retention and adherence. With exceptions, publications have tended to be descriptive rather than evaluative, and the evidence-base for the effectiveness of ICT-driven interventions remains mixed. There is widespread recognition of the potential for ICT to improve HIV cascade performance, but with significant challenges. Successful implementation of real-time cascade monitoring will depend upon stakeholder engagement, compatibility with existing workflows, appropriate resource allocation, and managing expectations.

  14. Integrated monitoring and assessment of air pollution

    Energy Technology Data Exchange (ETDEWEB)

    Hertel, O.

    2009-09-15

    Improved quality, better understanding of processes and optimisation of allocated resources, these are the main advantages of applying Integrated Monitoring and Assessment (IMA) in air quality management. The IMA is defined as the combined use of measurements and model calculations. The use of IMA is demonstrated with examples with different aims: to obtain data for air pollution in urban streets, to assess human exposure to traffic air pollution, and to assess atmospheric deposition of nitrogen compounds to marine and terrestrial ecosystems. (author)

  15. The Emergency Radiological Monitoring and Analysis Division of the United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    2000-01-01

    The U.S. Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. The FRERP authorises the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC), which is established to co-ordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted States and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for co-ordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis, and quality assurance. This program includes: 1. Aerial Radiological Monitoring - Fixed-Wing and Helicopter; 2. Field Monitoring and Sampling; 3. Radioanalysis - Mobile and Fixed Laboratories; 4. Radiation Detection Instrumentation - Calibration and Maintenance; 5. Environmental Dosimetry; 6. Integrated program of Quality Assurance. To assure consistency, completeness, and the quality of the data produced, a methodology and procedures manual is being developed. This paper discusses the structure, assets, and operations of the FRMAC Monitoring and Analysis Division and the content and preparation of the manual. (author)

  16. The use of plants for environmental monitoring and assessment.

    Science.gov (United States)

    Wang, W; Freemark, K

    1995-04-01

    This paper presents a critical review on phytotoxicity tests for environmental monitoring and assessment. Vascular macrophytes used in the laboratory testing are emphasized; algae are mentioned only for comparison. Several issues are discussed, including the rationale for and misconceptions about phytotoxicity tests, relation to regulation, status of phytotoxicity test protocols, advantages and disadvantages of phytotoxicity tests, and possible research directions. Aquatic and terrestrial macrophytes, along with algae, are essential components of ecosystems. Macrophytes are becoming more important for the monitoring and assessment of herbicides, effluents, and industrial chemicals. In the United States, Canada, and international organizations, phytotoxicity tests can be required for environmental monitoring and assessment in statutes such as Federal Insecticide, Fungicide, and Rodenticide Act; Toxic Substances Control Act; Water Quality Act; Canadian Pest Control Products Act; and Canadian Environmental Protection Act. Possible research directions for phytotoxicity tests are discussed relative to the role in regulations of industrial chemicals, effluents, hazardous waste sites, and pesticides.

  17. Integrating policy-based management and SLA performance monitoring

    Science.gov (United States)

    Liu, Tzong-Jye; Lin, Chin-Yi; Chang, Shu-Hsin; Yen, Meng-Tzu

    2001-10-01

    Policy-based management system provides the configuration capability for the system administrators to focus on the requirements of customers. The service level agreement performance monitoring mechanism helps system administrators to verify the correctness of policies. However, it is difficult for a device to process the policies directly because the policies are the management concept. This paper proposes a mechanism to decompose a policy into rules that can be efficiently processed by a device. Thus, the device may process the rule and collect the performance statistics information efficiently; and the policy-based management system may collect these performance statistics information and report the service-level agreement performance monitoring information to the system administrator. The proposed policy-based management system achieves both the policy configuration and service-level agreement performance monitoring requirements. A policy consists of a condition part and an action part. The condition part is a Boolean expression of a source host IP group, a destination host IP group, etc. The action part is the parameters of services. We say that an address group is compact if it only consists of a range of IP address that can be denoted by a pair of IP address and corresponding IP mask. If the condition part of a policy only consists of the compact address group, we say that the policy is a rule. Since a device can efficiently process a compact address and a system administrator prefers to define a range of IP address, the policy-based management system has to translate policy into rules and supplements the gaps between policy and rules. The proposed policy-based management system builds the relationships between VPN and policies, policy and rules. Since the system administrator wants to monitor the system performance information of VPNs and policies, the proposed policy-based management system downloads the relationships among VPNs, policies and rules to the

  18. Performance monitoring in the medial frontal cortex and related neural networks: From monitoring self actions to understanding others' actions.

    Science.gov (United States)

    Ninomiya, Taihei; Noritake, Atsushi; Ullsperger, Markus; Isoda, Masaki

    2018-04-27

    Action is a key channel for interacting with the outer world. As such, the ability to monitor actions and their consequences - regardless as to whether they are self-generated or other-generated - is of crucial importance for adaptive behavior. The medial frontal cortex (MFC) has long been studied as a critical node for performance monitoring in nonsocial contexts. Accumulating evidence suggests that the MFC is involved in a wide range of functions necessary for one's own performance monitoring, including error detection, and monitoring and resolving response conflicts. Recent studies, however, have also pointed to the importance of the MFC in performance monitoring under social conditions, ranging from monitoring and understanding others' actions to reading others' mental states, such as their beliefs and intentions (i.e., mentalizing). Here we review the functional roles of the MFC and related neural networks in performance monitoring in both nonsocial and social contexts, with an emphasis on the emerging field of a social systems neuroscience approach using macaque monkeys as a model system. Future work should determine the way in which the MFC exerts its monitoring function via interactions with other brain regions, such as the superior temporal sulcus in the mentalizing system and the ventral premotor cortex in the mirror system. Copyright © 2018. Published by Elsevier B.V.

  19. Electronic Performance Monitoring: An Organizational Justice and Concertive Control Perspective.

    Science.gov (United States)

    Alder, G. Stoney; Tompkins, Phillip K.

    1997-01-01

    Applies theories of organizational justice/concertive control to account for contradictions inherent in electronic monitoring of workers by organizations. Argues that results are usually positive when workers are involved in the design and implementation of monitoring systems, and monitoring is restricted to performance-related activities with…

  20. Performance analysis of the TNO TLD individual monitoring service

    International Nuclear Information System (INIS)

    Dijk, J.W.E. van; Julius, H.W.

    1990-01-01

    The purpose of this study was to analyse the performance and to establish the lowest detectable occupational dose (LDOD) of the TNO TL dosemeter, in use for large scale routine individual monitoring since 1983. The TNO individual monitoring service uses three TLD reader systems and over 45000 TL dosemeters, designed to measure H s (0.07) and H p (10). Each reader system is normalised daily and each individual dosemeter is calibrated every ten readout cycles. The performance of the service is monitored by a double blind experimental set-up. A series of 10 routine dosemeters is issued every fortnight, mailed, exposed by staff not involved in the monitoring service, sent back and evaluated. The conclusion of this study is that the lowest detectable occupational dose is less than 0.04 mSv and that the integrated dose at the level of the annual dose limit is measured within 2%. (author)

  1. An assessment of the performance of the Monitor for AeRosols and GAses in ambient air (MARGA): a semi-continuous method for soluble compounds

    Science.gov (United States)

    Rumsey, I. C.; Cowen, K. A.; Walker, J. T.; Kelly, T. J.; Hanft, E. A.; Mishoe, K.; Rogers, C.; Proost, R.; Beachley, G. M.; Lear, G.; Frelink, T.; Otjes, R. P.

    2014-06-01

    Ambient air monitoring as part of the US Environmental Protection Agency's (US EPA's) Clean Air Status and Trends Network (CASTNet) currently uses filter packs to measure weekly integrated concentrations. The US EPA is interested in supplementing CASTNet with semi-continuous monitoring systems at select sites to characterize atmospheric chemistry and deposition of nitrogen and sulfur compounds at higher time resolution than the filter pack. The Monitor for AeRosols and GAses in ambient air (MARGA) measures water-soluble gases and aerosols at an hourly temporal resolution. The performance of the MARGA was assessed under the US EPA Environmental Technology Verification (ETV) program. The assessment was conducted in Research Triangle Park, North Carolina, from 8 September to 8 October 2010 and focused on gaseous SO2, HNO3, and NH3 and aerosol SO42-, NO3-, and NH4+. Precision of the MARGA was evaluated by calculating the median absolute relative percent difference (MARPD) between paired hourly results from duplicate MARGA units (MUs), with a performance goal of ≤ 25%. The accuracy of the MARGA was evaluated by calculating the MARPD for each MU relative to the average of the duplicate denuder/filter pack concentrations, with a performance goal of ≤ 40%. Accuracy was also evaluated by using linear regression, where MU concentrations were plotted against the average of the duplicate denuder/filter pack concentrations. From this, a linear least squares line of best fit was applied. The goal was for the slope of the line of best fit to be between 0.8 and 1.2. The MARGA performed well in comparison to the denuder/filter pack for SO2, SO42-, and NH4+, with all three compounds passing the accuracy and precision goals by a significant margin. The performance of the MARGA in measuring NO3- could not be evaluated due to the different sampling efficiency of coarse NO3- by the MUs and the filter pack. Estimates of "fine" NO3- were calculated for the MUs and the filter pack

  2. Electoronic Performance Monitoring in Call Centers: An Ethical Decision Model

    OpenAIRE

    Perkins, David

    2013-01-01

    Ever since it emerged on a widespread basis in the 1990s, electronic performance monitoring of employees has received significant scrutiny in the literature. Call centers have been the focus of many of these studies. This particular study addresses the issue of electronic performance monitoring in call centers from an ethical perspective. The following ethical dilemma is offered: "Is it ethical for a call center manager to evaluate the performance of a call center employee using electronic pe...

  3. 200-BP-1 Prototype Hanford Barrier -- 15 Years of Performance Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Ward, Anderson L.; Draper, Kathryn E.; Link, Steven O.; Clayton, Ray E.

    2011-09-30

    Monitoring is an essential component of engineered barrier system design and operation. A composite capacitive cover, including a capillary break and an evapotranspiration (ET) barrier at the Hanford Site, is generating data that can be used to help resolve these issues. The prototype Hanford barrier was constructed over the 216-B-57 Crib in 1994 to evaluate surface-barrier constructability, construction costs, and physical and hydrologic performance at the field scale. The barrier has been routinely monitored between November 1994 and September 1998 as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200 BP 1 Operable Unit. Since FY 1998, monitoring has focused on a more limited set of key water balance, stability, and biotic parameters. In FY 2009, data collection was focused on: (1) water-balance monitoring, consisting of precipitation, runoff, soil moisture storage, and drainage measurements with evapotranspiration calculated by difference; (2) stability monitoring, consisting of asphalt-layer-settlement, basalt-side-slope-stability, and surface-elevation measurements; (3) vegetation dynamics; and (4) animal use. September 2009 marked 15 years since the start of monitoring and the collection of performance data. This report describes the results of monitoring activities during the period October 1, 2008, through September 30, 2009, and summarizes the 15 years of performance data collected from September 1994 through September 2009.

  4. High-Performance Monitoring Architecture for Large-Scale Distributed Systems Using Event Filtering

    Science.gov (United States)

    Maly, K.

    1998-01-01

    Monitoring is an essential process to observe and improve the reliability and the performance of large-scale distributed (LSD) systems. In an LSD environment, a large number of events is generated by the system components during its execution or interaction with external objects (e.g. users or processes). Monitoring such events is necessary for observing the run-time behavior of LSD systems and providing status information required for debugging, tuning and managing such applications. However, correlated events are generated concurrently and could be distributed in various locations in the applications environment which complicates the management decisions process and thereby makes monitoring LSD systems an intricate task. We propose a scalable high-performance monitoring architecture for LSD systems to detect and classify interesting local and global events and disseminate the monitoring information to the corresponding end- points management applications such as debugging and reactive control tools to improve the application performance and reliability. A large volume of events may be generated due to the extensive demands of the monitoring applications and the high interaction of LSD systems. The monitoring architecture employs a high-performance event filtering mechanism to efficiently process the large volume of event traffic generated by LSD systems and minimize the intrusiveness of the monitoring process by reducing the event traffic flow in the system and distributing the monitoring computation. Our architecture also supports dynamic and flexible reconfiguration of the monitoring mechanism via its Instrumentation and subscription components. As a case study, we show how our monitoring architecture can be utilized to improve the reliability and the performance of the Interactive Remote Instruction (IRI) system which is a large-scale distributed system for collaborative distance learning. The filtering mechanism represents an Intrinsic component integrated

  5. Process of performance assessment

    International Nuclear Information System (INIS)

    King, C.M.; Halford, D.K.

    1987-01-01

    Performance assessment is the process used to evaluate the environmental consequences of disposal of radioactive waste in the biosphere. An introductory review of the subject is presented. Emphasis is placed on the process of performance assessment from the standpoint of defining the process. Performance assessment, from evolving experience at DOE sites, has short-term and long-term subprograms, the components of which are discussed. The role of mathematical modeling in performance assessment is addressed including the pros and cons of current approaches. Finally, the system/site/technology issues as the focal point of this symposium are reviewed

  6. NRC performance assessment program

    International Nuclear Information System (INIS)

    Coplan, S.M.

    1986-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) performance assessment program includes the development of guidance to the U.S. Department of Energy (DOE) on preparation of a license application and on conducting the studies to support a license application. The nature of the licensing requirements of 10 CFR Part 60 create a need for performance assessments by the DOE. The NRC and DOE staffs each have specific roles in assuring the adequacy of those assessments. Performance allocation is an approach for determining what testing and analysis will be needed during site characterization to assure that an adequate data base is available to support the necessary performance assessments. From the standpoint of establishing is implementable methodology, the most challenging performance assessment needed for licensing is the one that will be used to determine compliance with the U.S. Environmental Protection Agency's (EPA) containment requirement

  7. Bioaccumulation in aquatic systems: methodological approaches, monitoring and assessment

    DEFF Research Database (Denmark)

    Schäfer, Sabine; Buchmeier, Georgia; Claus, Evelyn

    2015-01-01

    , various scientific and regulatory aspects of bioaccumulation in aquatic systems and the relevant critical issues are discussed. Monitoring chemical concentrations in biota can be used for compliance checking with regulatory directives, for identification of chemical sources or event-related environmental...... temporal and geographical range. Bioaccumulation is also assessed for regulation of chemicals of environmental concern whereby mainly data from laboratory studies on fish bioaccumulation are used. Field data can, however, provide additional important information for regulators. Strategies...... for bioaccumulation assessment still need to be harmonised for different regulations and groups of chemicals. To create awareness for critical issues and to mutually benefit from technical expertise and scientific findings, communication between risk assessment and monitoring communities needs to be improved...

  8. Federal Radiological Monitoring and Assessment Center: Phase I Response

    International Nuclear Information System (INIS)

    Riland, C.; Bowman, D.R.; Lambert, R.; Tighe, R.

    1999-01-01

    A Federal Radiological Monitoring and Assessment Center (FRMAC) is established in response to a Lead Federal Agency (LFA) or State request when a radiological emergency is anticipated or has occurred. The FRMAC coordinates the off-site monitoring, assessment, and analysis activities during such an emergency. The FRMAC response is divided into three phases. FRMAC Phase 1 is a rapid, initial-response capability that can interface with Federal or State officials and is designed for a quick response time and rapid radiological data collection and assessment. FRMAC Phase 1 products provide an initial characterization of the radiological situation and information on early health effects to officials responsible for making and implementing protective action decisions

  9. Performance monitoring of GRID superscalar with OCM-G/G-PM: Integration issues

    NARCIS (Netherlands)

    Badia, R.M.; Sirvent, R.; Bubak, M.; Funika, W.; Machner, P.; Gorlatch, S.; Bubak, M.; Priol, T.

    2008-01-01

    In this paper the use of a Grid-enabled system for performance monitoring of GRID superscalar-compliant applications is addressed. Performance monitoring is built on top of the OCM-G monitoring system developed in the EU IST CrossGrid project. A graphical user tool G-PM is used to interpret

  10. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Monitoring and reporting program and financial performance. 600.341 Section 600.341 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL... Organizations Post-Award Requirements § 600.341 Monitoring and reporting program and financial performance. (a...

  11. The Effects of Performance-Based Assessment Criteria on Student Performance and Self-Assessment Skills

    Science.gov (United States)

    Fastre, Greet Mia Jos; van der Klink, Marcel R.; van Merrienboer, Jeroen J. G.

    2010-01-01

    This study investigated the effect of performance-based versus competence-based assessment criteria on task performance and self-assessment skills among 39 novice secondary vocational education students in the domain of nursing and care. In a performance-based assessment group students are provided with a preset list of performance-based…

  12. ASSESSMENT OF DYNAMIC PRA TECHNIQUES WITH INDUSTRY AVERAGE COMPONENT PERFORMANCE DATA

    Energy Technology Data Exchange (ETDEWEB)

    Yadav, Vaibhav; Agarwal, Vivek; Gribok, Andrei V.; Smith, Curtis L.

    2017-06-01

    In the nuclear industry, risk monitors are intended to provide a point-in-time estimate of the system risk given the current plant configuration. Current risk monitors are limited in that they do not properly take into account the deteriorating states of plant equipment, which are unit-specific. Current approaches to computing risk monitors use probabilistic risk assessment (PRA) techniques, but the assessment is typically a snapshot in time. Living PRA models attempt to address limitations of traditional PRA models in a limited sense by including temporary changes in plant and system configurations. However, information on plant component health are not considered. This often leaves risk monitors using living PRA models incapable of conducting evaluations with dynamic degradation scenarios evolving over time. There is a need to develop enabling approaches to solidify risk monitors to provide time and condition-dependent risk by integrating traditional PRA models with condition monitoring and prognostic techniques. This paper presents estimation of system risk evolution over time by integrating plant risk monitoring data with dynamic PRA methods incorporating aging and degradation. Several online, non-destructive approaches have been developed for diagnosing plant component conditions in nuclear industry, i.e., condition indication index, using vibration analysis, current signatures, and operational history [1]. In this work the component performance measures at U.S. commercial nuclear power plants (NPP) [2] are incorporated within the various dynamic PRA methodologies [3] to provide better estimates of probability of failures. Aging and degradation is modeled within the Level-1 PRA framework and is applied to several failure modes of pumps and can be extended to a range of components, viz. valves, generators, batteries, and pipes.

  13. Health Monitoring System Technology Assessments: Cost Benefits Analysis

    Science.gov (United States)

    Kent, Renee M.; Murphy, Dennis A.

    2000-01-01

    The subject of sensor-based structural health monitoring is very diverse and encompasses a wide range of activities including initiatives and innovations involving the development of advanced sensor, signal processing, data analysis, and actuation and control technologies. In addition, it embraces the consideration of the availability of low-cost, high-quality contributing technologies, computational utilities, and hardware and software resources that enable the operational realization of robust health monitoring technologies. This report presents a detailed analysis of the cost benefit and other logistics and operational considerations associated with the implementation and utilization of sensor-based technologies for use in aerospace structure health monitoring. The scope of this volume is to assess the economic impact, from an end-user perspective, implementation health monitoring technologies on three structures. It specifically focuses on evaluating the impact on maintaining and supporting these structures with and without health monitoring capability.

  14. Assessment and rationalization of water quality monitoring network: a multivariate statistical approach to the Kabbini River (India).

    Science.gov (United States)

    Mavukkandy, Musthafa Odayooth; Karmakar, Subhankar; Harikumar, P S

    2014-09-01

    network is assessed. Significance of seasonal redesign of the monitoring network is demonstrated. Rationalization of water quality parameters is performed in a statistical framework.

  15. SCALEA-G: A Unified Monitoring and Performance Analysis System for the Grid

    Directory of Open Access Journals (Sweden)

    Hong-Linh Truong

    2004-01-01

    Full Text Available This paper describes SCALEA-G, a unified monitoring and performance analysis system for the Grid. SCALEA-G is implemented as a set of grid services based on the Open Grid Services Architecture (OGSA. SCALEA-G provides an infrastructure for conducting online monitoring and performance analysis of a variety of Grid services including computational and network resources, and Grid applications. Both push and pull models are supported, providing flexible and scalable monitoring and performance analysis. Source code and dynamic instrumentation are implemented to perform profiling and monitoring of Grid applications. A novel instrumentation request language for dynamic instrumentation and a standardized intermediate representation for binary code have been developed to facilitate the interaction between client and instrumentation services.

  16. Performance Monitoring in Children Following Traumatic Brain Injury Compared to Typically Developing Children

    Directory of Open Access Journals (Sweden)

    Amy A. Wilkinson PhD

    2017-10-01

    Full Text Available Children with traumatic brain injury are reported to have deficits in performance monitoring, but the mechanisms underlying these deficits are not well understood. Four performance monitoring hypotheses were explored by comparing how 28 children with traumatic brain injury and 28 typically developing controls (matched by age and sex performed on the stop-signal task. Control children slowed significantly more following incorrect than correct stop-signal trials, fitting the error monitoring hypothesis. In contrast, the traumatic brain injury group showed no performance monitoring difference with trial types, but significant group differences did not emerge, suggesting that children with traumatic brain injury may not perform the same way as controls.

  17. Enhanced Performance Assessment System (EPAS) for carbon sequestration.

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yifeng; Sun, Amy Cha-Tien; McNeish, Jerry A. (Sandia National Laboratories, Livermore, CA); Dewers, Thomas A.; Hadgu, Teklu; Jove-Colon, Carlos F.

    2010-09-01

    Carbon capture and sequestration (CCS) is an option to mitigate impacts of atmospheric carbon emission. Numerous factors are important in determining the overall effectiveness of long-term geologic storage of carbon, including leakage rates, volume of storage available, and system costs. Recent efforts have been made to apply an existing probabilistic performance assessment (PA) methodology developed for deep nuclear waste geologic repositories to evaluate the effectiveness of subsurface carbon storage (Viswanathan et al., 2008; Stauffer et al., 2009). However, to address the most pressing management, regulatory, and scientific concerns with subsurface carbon storage (CS), the existing PA methodology and tools must be enhanced and upgraded. For example, in the evaluation of a nuclear waste repository, a PA model is essentially a forward model that samples input parameters and runs multiple realizations to estimate future consequences and determine important parameters driving the system performance. In the CS evaluation, however, a PA model must be able to run both forward and inverse calculations to support optimization of CO{sub 2} injection and real-time site monitoring as an integral part of the system design and operation. The monitoring data must be continually fused into the PA model through model inversion and parameter estimation. Model calculations will in turn guide the design of optimal monitoring and carbon-injection strategies (e.g., in terms of monitoring techniques, locations, and time intervals). Under the support of Laboratory-Directed Research & Development (LDRD), a late-start LDRD project was initiated in June of Fiscal Year 2010 to explore the concept of an enhanced performance assessment system (EPAS) for carbon sequestration and storage. In spite of the tight time constraints, significant progress has been made on the project: (1) Following the general PA methodology, a preliminary Feature, Event, and Process (FEP) analysis was performed for

  18. Performance Assessment and Geometric Calibration of RESOURCESAT-2

    Science.gov (United States)

    Radhadevi, P. V.; Solanki, S. S.; Akilan, A.; Jyothi, M. V.; Nagasubramanian, V.

    2016-06-01

    Resourcesat-2 (RS-2) has successfully completed five years of operations in its orbit. This satellite has multi-resolution and multi-spectral capabilities in a single platform. A continuous and autonomous co-registration, geo-location and radiometric calibration of image data from different sensors with widely varying view angles and resolution was one of the challenges of RS-2 data processing. On-orbit geometric performance of RS-2 sensors has been widely assessed and calibrated during the initial phase operations. Since then, as an ongoing activity, various geometric performance data are being generated periodically. This is performed with sites of dense ground control points (GCPs). These parameters are correlated to the direct geo-location accuracy of the RS-2 sensors and are monitored and validated to maintain the performance. This paper brings out the geometric accuracy assessment, calibration and validation done for about 500 datasets of RS-2. The objectives of this study are to ensure the best absolute and relative location accuracy of different cameras, location performance with payload steering and co-registration of multiple bands. This is done using a viewing geometry model, given ephemeris and attitude data, precise camera geometry and datum transformation. In the model, the forward and reverse transformations between the coordinate systems associated with the focal plane, payload, body, orbit and ground are rigorously and explicitly defined. System level tests using comparisons to ground check points have validated the operational geo-location accuracy performance and the stability of the calibration parameters.

  19. 24 CFR 115.206 - Performance assessments; Performance standards.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Performance assessments; Performance standards. 115.206 Section 115.206 Housing and Urban Development Regulations Relating to Housing... AGENCIES Certification of Substantially Equivalent Agencies § 115.206 Performance assessments; Performance...

  20. System for ecological monitoring and assessment for NPP site environment

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Olejnikov, N.F.; Reznichenko, V.Yu.

    1987-01-01

    On the basis of the Leningrad NPP named after V.I. Lenin the development of a system for ecological monitoring and assessment (EMA) of the environment state and health of personnel and population has started in the EMA program framework. The program of ecological monitoring and assessment coordinates the works on the study of NPP effect on the nature and people, effect of separate factors and their combination, methods and models for the description of the effects, forecasting and evaluation, selection of the optimal protection strategies. Scientific foundations, structure and content of the EMA program are given to coordinate the works carried out according to the program with other works carried out in the country in this direction. The paper deals with the composition of monitoring parameters of the standard system of ecological monitoring of the environment for NPP

  1. Quality Assurance in Individual Monitoring: 10 Years of Performance Monitoring of the TLD Based TNO Individual Monitoring Service (invited paper)

    Energy Technology Data Exchange (ETDEWEB)

    Dijk, J.W.E. van

    1998-07-01

    The QA subscription forms the nucleus of the Quality Assurance (QA) programme of the TLD-based Individual Monitoring Service of TNO-CSD. This QA subscription is the subscription of a dummy customer to the service. As this customer is treated exactly like a normal customer, all aspects of the service are monitored by the QA subscription. An overview is given of 10 years of monitoring the performance of the service. Various improvements over the past decade have resulted in a standard deviation in a low dose measurement of 0.01 mSv and a relative standard deviation at higher doses of 5%. These figures represent the performance under routine circumstances and thus include variations due to variations in the natural background from place to place and, for example, due to transport. (author)

  2. Quality Assurance in Individual Monitoring: 10 Years of Performance Monitoring of the TLD Based TNO Individual Monitoring Service (invited paper)

    International Nuclear Information System (INIS)

    Dijk, J.W.E. van

    1998-01-01

    The QA subscription forms the nucleus of the Quality Assurance (QA) programme of the TLD-based Individual Monitoring Service of TNO-CSD. This QA subscription is the subscription of a dummy customer to the service. As this customer is treated exactly like a normal customer, all aspects of the service are monitored by the QA subscription. An overview is given of 10 years of monitoring the performance of the service. Various improvements over the past decade have resulted in a standard deviation in a low dose measurement of 0.01 mSv and a relative standard deviation at higher doses of 5%. These figures represent the performance under routine circumstances and thus include variations due to variations in the natural background from place to place and, for example, due to transport. (author)

  3. Development of an air-operated actuator performance monitoring system for regulatory usage

    International Nuclear Information System (INIS)

    Sung, K. Y.; Kwon, S. J.

    2004-01-01

    The performance monitoring system of air-operated actuators for regulatory usage has been being developed. Essential elements and operating parameters affecting the actuator performance have been investigated to provide basic information for system development. The monitoring system including an air-operated actuator testing facility and analysis softwares for monitoring and evaluation are also introduced in this paper. As a result of simulated tests, it was known that the system could be a useful tool for the effective monitoring of actuator performance change and fault conditions. This system would be applied to regulatory inspection for utility's data validation and to the training of regulatory staff in future after some modification and expansion

  4. Assessment of ground-based monitoring techniques applied to landslide investigations

    Science.gov (United States)

    Uhlemann, S.; Smith, A.; Chambers, J.; Dixon, N.; Dijkstra, T.; Haslam, E.; Meldrum, P.; Merritt, A.; Gunn, D.; Mackay, J.

    2016-01-01

    A landslide complex in the Whitby Mudstone Formation at Hollin Hill, North Yorkshire, UK is periodically re-activated in response to rainfall-induced pore-water pressure fluctuations. This paper compares long-term measurements (i.e., 2009-2014) obtained from a combination of monitoring techniques that have been employed together for the first time on an active landslide. The results highlight the relative performance of the different techniques, and can provide guidance for researchers and practitioners for selecting and installing appropriate monitoring techniques to assess unstable slopes. Particular attention is given to the spatial and temporal resolutions offered by the different approaches that include: Real Time Kinematic-GPS (RTK-GPS) monitoring of a ground surface marker array, conventional inclinometers, Shape Acceleration Arrays (SAA), tilt meters, active waveguides with Acoustic Emission (AE) monitoring, and piezometers. High spatial resolution information has allowed locating areas of stability and instability across a large slope. This has enabled identification of areas where further monitoring efforts should be focused. High temporal resolution information allowed the capture of 'S'-shaped slope displacement-time behaviour (i.e. phases of slope acceleration, deceleration and stability) in response to elevations in pore-water pressures. This study shows that a well-balanced suite of monitoring techniques that provides high temporal and spatial resolutions on both measurement and slope scale is necessary to fully understand failure and movement mechanisms of slopes. In the case of the Hollin Hill landslide it enabled detailed interpretation of the geomorphological processes governing landslide activity. It highlights the benefit of regularly surveying a network of GPS markers to determine areas for installation of movement monitoring techniques that offer higher resolution both temporally and spatially. The small sensitivity of tilt meter measurements

  5. A FRAMEWORK FOR PERFORMANCE EVALUATION AND MONITORING OF PUBLIC HEALTH PROGRAM USING COMPOSITE PERFORMANCE INDEX

    Directory of Open Access Journals (Sweden)

    Susanta Kumar Gauri

    2017-12-01

    Full Text Available A public health program (PHP taken up by the government of a country refers to all organized measures to prevent disease and promote health among the population, by providing different planned cares/services to the people. Usually, the target population for different PHP are different. The basic requirement for success of a PHP is to ensure that all the planned cares/services are reached to each member of the target population. Therefore, the important performance measures for a PHP are the implementation status of all the planned cares/services under the PHP. However, management and monitoring of a PHP become quite difficult by interpreting separately the information contained in a large number of performance measures. Therefore, usually a metric, called composite performance index (CPI, is evaluated to understand the overall performance of a PHP. However, due a scaling operation involved in the CPI computation procedure, the CPI value does not reveal the true overall implementation status of a PHP and consequently, it is effective for management of a PHP. This paper presents a new approach for CPI computation, in which scaling/normalization of the performance variables is not required and therefore, it can be used for monitoring the true overall implementation status of a PHP in a region. A systematic approach for monitoring a PHP using the CPI values is proposed and applied for monitoring the maternal and child healthcare (MCH program. The results are found effective towards continuous improvement of implementation status.

  6. Monitoring, Analyzing and Assessing Radiation Belt Loss and Energization

    Science.gov (United States)

    Daglis, I.; Balasis, G.; Bourdarie, S.; Horne, R.; Khotyaintsev, Y.; Mann, I.; Santolik, O.; Turner, D.; Anastasiadis, A.; Georgiou, M.; Giannakis, O.; Papadimitriou, C.; Ropokis, G.; Sandberg, I.; Angelopoulos, V.; Glauert, S.; Grison, B., Kersten T.; Kolmasova, I.; Lazaro, D.; Mella, M.; Ozeke, L.; Usanova, M.

    2013-09-01

    We present the concept, objectives and expected impact of the MAARBLE (Monitoring, Analyzing and Assessing Radiation Belt Loss and Energization) project, which is being implemented by a consortium of seven institutions (five European, one Canadian and one US) with support from the European Community's Seventh Framework Programme. The MAARBLE project employs multi-spacecraft monitoring of the geospace environment, complemented by ground-based monitoring, in order to analyze and assess the physical mechanisms leading to radiation belt particle energization and loss. Particular attention is paid to the role of ULF/VLF waves. A database containing properties of the waves is being created and will be made available to the scientific community. Based on the wave database, a statistical model of the wave activity dependent on the level of geomagnetic activity, solar wind forcing, and magnetospheric region will be developed. Multi-spacecraft particle measurements will be incorporated into data assimilation tools, leading to new understanding of the causal relationships between ULF/VLF waves and radiation belt dynamics. Data assimilation techniques have been proven as a valuable tool in the field of radiation belts, able to guide 'the best' estimate of the state of a complex system. The MAARBLE (Monitoring, Analyzing and Assessing Radiation Belt Energization and Loss) collaborative research project has received funding from the European Union’s Seventh Framework Programme (FP7-SPACE-2011-1) under grant agreement no. 284520.

  7. Monitoring long-term ecological changes through the Ecological Monitoring and Assessment Network: science-based and policy relevant.

    Science.gov (United States)

    Vaughan, H; Brydges, T; Fenech, A; Lumb, A

    2001-01-01

    Ecological monitoring and its associated research programs have often provided answers to various environmental management issues. In the face of changing environmental conditions, ecological monitoring provides decision-makers with reliable information as they grapple with maintaining a sustainable economy and healthy environment. The Ecological Monitoring and Assessment Network (EMAN) is a national ecological monitoring network consisting of (1) about 100 case study sites across the country characterized by long-term multi-disciplinary environmental work conducted by a multitude of agencies (142 partners and counting); (2) a variety of less comprehensive yet more extensive monitoring sites; (3) a network where core monitoring variables of ecosystem change are measured; and (4) geo-referenced environmental observations. Environment Canada is the co-ordinating partner for the network through the EMAN Co-ordinating Office. EMAN's mission is to focus a scientifically-sound, policy-relevant ecosystem monitoring and research network based on (a) stabilizing a network of case-study sites operated by a variety of partners, and (b) developing a number of cooperative dispersed monitoring initiatives in order to deliver unique and needed goods and services. These goods and services include: (1) an efficient and cost-effective early warning system which detects, describes and reports on changes in Canadian ecosystems at a national or ecozone scale; and (2) cross-disciplinary and cross-jurisdictional assessments of ecosystem status, trends and processes. The early warning system and assessments of ecosystem status, trends and processes provide Environment Canada and partner organizations with timely information that facilitates increasingly adaptive policies and priority setting. Canadians are also informed of changes and trends occurring in Canadian ecosystems and, as a result, are better able to make decisions related to conservation and sustainability.

  8. Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2005-12-01

    The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, was re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for coal/IGCC powerplants. The new program was re-titled ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants''. This final report summarizes the work accomplished from March 1, 2003 to March 31, 2004 on the four original tasks, and the work accomplished from April 1, 2004 to July 30, 2005 on the two re-directed tasks. The program Tasks are summarized below: Task 1--IGCC Environmental Impact on high Temperature Materials: The first task was refocused to address IGCC environmental impacts on high temperature materials used in gas turbines. This task screened material performance and quantified the effects of high temperature erosion and corrosion of hot gas path materials in coal/IGCC applications. The materials of interest included those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: The second task was reduced in scope to demonstrate new technologies to determine the inservice health of advanced technology coal/IGCC powerplants. The task focused on two critical sensing needs for advanced coal/IGCC gas turbines: (1) Fuel Quality Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and detection of fuel impurities that could lead to rapid component degradation. (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware. Task 3--Advanced Methods for Combustion Monitoring and Control: The third task was originally to develop and validate advanced monitoring and control methods for coal/IGCC gas

  9. Potential of acoustic monitoring for safety assessment of primary system

    International Nuclear Information System (INIS)

    Olma, B.J.

    1997-01-01

    Safety assessment of the primary system and its components with respect to their mechanical integrity is increasingly supported by acoustic signature analysis during power operation of the plants. Acoustic signals of Loose Parts Monitoring System sensors are continuously monitored by dedicated digital systems for signal bursts associated with metallic impacts. Several years of ISTec/GRS experience and the practical use of its digital systems MEDEA and RAMSES have shown that acoustic monitoring is very successful for detecting component failures at an early stage. Advanced powerful tools for classification and acoustic evaluation of burst signals have recently been realized. The paper presents diagnosis experiences of BWR's and PWR's safety assessment. (author). 7 refs, 8 figs

  10. UCIMS: Advances in geotechnical construction and performance monitoring

    Directory of Open Access Journals (Sweden)

    Raphael Siebenmann

    2015-04-01

    Full Text Available The Crossrail project currently under construction in Central London has been described as “The Big Dig on Steroids”, obviously referencing the Central Artery/Tunnel project in Boston completed in 2007. To address the multiple demands for timely construction performance monitoring, Crossrail envisioned the underground construction information management system (UCIMS to monitor construction progress and structural health along the entire route, with a network of geotechnical instruments (i.e. slope inclinometers, extensometers, piezometers, etc. and tunnel boring machine (TBM position information. The UCIMS is a geospatially referenced relational database that was developed using an open source geographic information system (GIS that allowed all stakeholders near immediate feedback of construction performance. The purpose of this article is to provide a brief history of geotechnical and structural monitoring software, to describe the structure and operation of the UCIMS, and to demonstrate how the functionality afforded by this system provided the requisite feedback to the stakeholders. Examples will be given regarding how the data management and visualization concepts incorporated into the UCIMS advanced the geotechnical construction industry.

  11. Preliminary Analysis of Remote Monitoring and Robotic Concepts for Performance Confirmation

    International Nuclear Information System (INIS)

    McAffee, D.A.

    1997-01-01

    As defined in 10 CFR Part 60.2, Performance Confirmation is the ''program of tests, experiments and analyses which is conducted to evaluate the accuracy and adequacy of the information used to determine with reasonable assurance that the performance objectives for the period after permanent closure will be met''. The overall Performance Confirmation program begins during site characterization and continues up to repository closure. The main purpose of this document is to develop, explore and analyze initial concepts for using remotely operated and robotic systems in gathering repository performance information during Performance Confirmation. This analysis focuses primarily on possible Performance Confirmation related applications within the emplacement drifts after waste packages have been emplaced (post-emplacement) and before permanent closure of the repository (preclosure). This will be a period of time lasting approximately 100 years and basically coincides with the Caretaker phase of the project. This analysis also examines, to a lesser extent, some applications related to Caretaker operations. A previous report examined remote handling and robotic technologies that could be employed during the waste package emplacement phase of the project (Reference 5.1). This analysis is being prepared to provide an early investigation of possible design concepts and technical challenges associated with developing remote systems for monitoring and inspecting activities during Performance Confirmation. The writing of this analysis preceded formal development of Performance Confirmation functional requirements and program plans and therefore examines, in part, the fundamental Performance Confirmation monitoring needs and operating conditions. The scope and primary objectives of this analysis are to: (1) Describe the operating environment and conditions expected in the emplacement drifts during the preclosure period. (Presented in Section 7.2). (2) Identify and discuss the

  12. Passive performance monitoring and traffic characteristics on the SLAC internet border

    International Nuclear Information System (INIS)

    Logg, C.; Cottrell, L.

    2001-01-01

    Understanding how the Internet is used by HEP is critical to optimizing the performance of the inter-lab computing environment. Typically use requirements have been defined by discussions between collaborators. However, later analysis of the actual traffic has show this is often misunderstood and actual use is significantly different to that predicted. Passive monitoring of the real traffic provides insight into the true communications requirements and the performance of a large number of inter-communicating nodes. It may be useful in identifying performance problems that are due to factors other than Internet congestion, especially when compared to other methods such as active monitoring where traffic is generated specifically to measure its performance. Controlled active monitoring between dedicated servers often gives an indication of what can be achieved on a network. Passive monitoring of the real traffic gives a picture of the true performance. The authors will discuss the method and results of collecting and analyzing flows of data obtained from the SLAC Internet border. The insights this has brought to understanding the network will be reviewed and the benefit it can bring to engineering networks will be discussed

  13. A systematic review of the cost of data collection for performance monitoring in hospitals.

    Science.gov (United States)

    Jones, Cheryl; Gannon, Brenda; Wakai, Abel; O'Sullivan, Ronan

    2015-04-01

    Key performance indicators (KPIs) are used to identify where organisational performance is meeting desired standards and where performance requires improvement. Valid and reliable KPIs depend on the availability of high-quality data, specifically the relevant minimum data set ((MDS) the core data identified as the minimum required to measure performance for a KPI) elements. However, the feasibility of collecting the relevant MDS elements is always a limitation of performance monitoring using KPIs. Preferably, data should be integrated into service delivery, and, where additional data are required that are not currently collected as part of routine service delivery, there should be an economic evaluation to determine the cost of data collection. The aim of this systematic review was to synthesise the evidence base concerning the costs of data collection in hospitals for performance monitoring using KPI, and to identify hospital data collection systems that have proven to be cost minimising. We searched MEDLINE (1946 to May week 4 2014), Embase (1974 to May week 2 2014), and CINAHL (1937 to date). The database searches were supplemented by searching for grey literature through the OpenGrey database. Data was extracted, tabulated, and summarised as part of a narrative synthesis. The searches yielded a total of 1,135 publications. After assessing each identified study against specific inclusion exclusion criteria only eight studies were deemed as relevant for this review. The studies attempt to evaluate different types of data collection interventions including the installation of information communication technology (ICT), improvements to current ICT systems, and how different analysis techniques may be used to monitor performance. The evaluation methods used to measure the costs and benefits of data collection interventions are inconsistent across the identified literature. Overall, the results weakly indicate that collection of hospital data and improvements in data

  14. Monitoring the performance of off-site processors

    International Nuclear Information System (INIS)

    Miller, C.C.

    1995-01-01

    Commercial nuclear power plants have been able to utilize the latest technologies and achieve large volume reduction by obtaining off-site waste processor services. Although the use of such services reduce the burden of waste processing it also reduces the utility's control over the process. Monitoring the performance of off-site processors is important so that the utility is cognizant of the waste disposition for required regulatory reporting. In addition to obtaining data for Reg Guide 1.21 reporting, Performance monitoring is important to determine which vendor and which services to utilize. Off-site processor services were initially offered for the decontamination of metallic waste. Since that time the list of services has expanded to include supercompaction, survey for release, incineration and metal melting. The number of vendors offering off-site services has increased and the services they offer vary. processing rates vary between vendors and have different charge bases. Determining which vendor to use for what service can be complicated and confusing

  15. Monitoring performance for hydraulic fracturing using synthetic microseismic catalogue at the Wysin site (Poland)

    Science.gov (United States)

    Ángel López Comino, José; Cesca, Simone; Kriegerowski, Marius; Heimann, Sebastian; Dahm, Torsten; Mirek, Janusz; Lasocky, Stanislaw

    2017-04-01

    Previous analysis to assess the monitoring performance of a dedicated seismic network are always useful to determine its capability of detecting, locating and characterizing target seismicity. This work focuses on a hydrofracking experiment in Poland, which is monitored in the framework of the SHEER (SHale gas Exploration and Exploitation induced Risks) EU project. The seismic installation is located near Wysin (Poland), in the central-western part of the Peribaltic synclise at Pomerania. The network setup includes a distributed network of six broadband stations, three shallow borehole stations and three small-scale arrays. We assess the monitoring performance prior operations, using synthetic seismograms. Realistic full waveform are generated and combined with real noise before fracking operations, to produce either event based or continuous synthetic waveforms. Background seismicity is modelled by double couple (DC) focal mechanisms. Non-DC sources resemble induced tensile fractures opening in the direction of the minimal compressive stress and closing in the same direction after the injection. Microseismic sources are combined with a realistic crustal model, distribution of hypocenters, magnitudes and source durations. The network detection performance is then assessed in terms of Magnitude of Completeness (Mc) through two different techniques: i) using an amplitude threshold approach, taking into account a station dependent noise level and different values of signal-to-noise ratio (SNR) and ii) through the application of an automatic detection algorithm to the continuous synthetic dataset. In the first case, we compare the maximal amplitude of noise free synthetic waveforms with the different noise levels. Imposing the simultaneous detection at e.g. 4 stations for a robust detection, the Mc is assessed and can be adjusted by empirical relationships for different SNR values. We find that different source mechanisms have different detection threshold. The

  16. Assessing the performance of sewer rehabilitation on the reduction of infiltration and inflow.

    Science.gov (United States)

    Staufer, P; Scheidegger, A; Rieckermann, J

    2012-10-15

    Inflow and Infiltration (I/I) into sewer systems is generally unwanted, because, among other things, it decreases the performance of wastewater treatment plants and increases combined sewage overflows. As sewer rehabilitation to reduce I/I is very expensive, water managers not only need methods to accurately measure I/I, but also they need sound approaches to assess the actual performance of implemented rehabilitation measures. However, such performance assessment is rarely performed. On the one hand, it is challenging to adequately take into account the variability of influential factors, such as hydro-meteorological conditions. On the other hand, it is currently not clear how experimental data can indeed support robust evidence for reduced I/I. In this paper, we therefore statistically assess the performance of rehabilitation measures to reduce I/I. This is possible by using observations in a suitable reference catchment as a control group and assessing the significance of the observed effect by regression analysis, which is well established in other disciplines. We successfully demonstrate the usefulness of the approach in a case study, where rehabilitation reduced groundwater infiltration by 23.9%. A reduction of stormwater inflow of 35.7%, however, was not statistically significant. Investigations into the experimental design of monitoring campaigns confirmed that the variability of the data as well as the number of observations collected before the rehabilitation impact the detection limit of the effect. This implies that it is difficult to improve the data quality after the rehabilitation has been implemented. Therefore, future practical applications should consider a careful experimental design. Further developments could employ more sophisticated monitoring methods, such as stable environmental isotopes, to directly observe the individual infiltration components. In addition, water managers should develop strategies to effectively communicate statistically

  17. Bridge Performance Assessment Based on an Adaptive Neuro-Fuzzy Inference System with Wavelet Filter for the GPS Measurements

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2015-10-01

    Full Text Available This study describes the performance assessment of the Huangpu Bridge in Guangzhou, China based on long-term monitoring in real-time by the kinematic global positioning system (RTK-GPS technique. Wavelet transformde-noising is applied to filter the GPS measurements, while the adaptive neuro-fuzzy inference system (ANFIS time series output-only model is used to predict the deformations of GPS-bridge monitoring points. In addition, GPS and accelerometer monitoring systems are used to evaluate the bridge oscillation performance. The conclusions drawn from investigating the numerical results show that: (1the wavelet de-noising of the GPS measurements of the different recording points on the bridge is a suitable tool to efficiently eliminate the signal noise and extract the different deformation components such as: semi-static and dynamic displacements; (2 the ANFIS method with two multi-input single output model is revealed to powerfully predict GPS movement measurements and assess the bridge deformations; and (3 The installed structural health monitoring system and the applied ANFIS movement prediction performance model are solely sufficient to assure bridge safety based on the analyses of the different filtered movement components.

  18. Standard guide to In-Plant performance evaluation of Hand-Held SNM monitors

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1999-01-01

    1.1 This guide is one of a series on the application and evaluation of special nuclear material (SNM) monitors. Other guides in the series are listed in Section 2, and the relationship of in-plant performance evaluation to other procedures described in the series is illustrated in Fig. 1. Hand-held SNM monitors are described in of Guide C1112, and performance criteria illustrating their capabilities can be found in Appendix X1. 1.2 The purpose of this guide to in-plant performance evaluation is to provide a comparatively rapid procedure to verify that a hand-held SNM monitor performs as expected for detecting SNM or alternative test sources or to disclose the need for repair. The procedure can be used as a routine operational evaluation or it can be used to verify performance after a monitor is calibrated. 1.3 In-plant performance evaluations are more comprehensive than daily functional tests. They take place less often, at intervals ranging from weekly to once every three months, and derive their result fr...

  19. CLASSIFICATION OF THE MGR PERFORMANCE CONFIRMATION DATA ACQUISITION/MONITORING SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) performance confirmation data acquisition/monitoring system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMF 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333PY ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  20. Performance assessment and adoption processes of an information monitoring and diagnostic system prototype

    Energy Technology Data Exchange (ETDEWEB)

    Piette, Mary Ann

    1999-10-01

    This report addresses the problem that buildings do not perform as well as anticipated during design. We partnered with an innovative building operator to evaluate a prototype Information Monitoring and Diagnostic System (IMDS). The IMDS consists of high-quality measurements archived each minute, a data visualization tool, and a web-based capability. The operators recommend similar technology be adopted in other buildings. The IMDS has been used to identify and correct a series of control problems. It has also allowed the operators to make more effective use of the building control system, freeing up time to take care of other tenant needs. They believe they have significantly improved building comfort, potentially improving tenant health, and productivity. The reduction in hours to operate the building are worth about $20,000 per year, which could pay for the IMDS in about five years. A control system retrofit based on findings from the IMDS is expected to reduce energy use by 20 percent over the next year, worth over $30,000 per year. The main conclusion of the model-based chiller fault detection work is that steady-state models can be used as reference models to monitor chiller operation and detect faults. The ability of the IMDS to measure cooling load and chiller power to one-percent accuracy with a one-minute sampling interval permits detection of additional faults. Evolutionary programming techniques were also evaluated, showing promise in the detection of patterns in building data. We also evaluated two technology adoption processes, radical and routine. In routine adoption, managers enhance features of existing products that are already well understood. In radical adoption, innovative building managers introduce novel technology into their organizations without using the rigorous payback criteria used in routine innovations.

  1. Monitoring worksite clinic performance using a cost-benefit tool.

    Science.gov (United States)

    Tao, Xuguang; Chenoweth, David; Alfriend, Amy S; Baron, David M; Kirkland, Tracie W; Scherb, Jill; Bernacki, Edward J

    2009-10-01

    The purpose of this study was to explore the usefulness of continuously assessing the return on investment (ROI) of worksite medical clinics as a means of evaluating clinic performance. Visit data from January 1, 2007, to December 31, 2008, were collected from all the on-site clinics operated for the Pepsi Bottling Group. An average system-wide ROI was calculated from the time of each clinic's opening and throughout the study period. A multivariate linear regression model was used to determine the association of average ROI with penetration/utilization rate and plant size. A total of 26 on-site clinics were actively running as of December 2008. The average ROI at the time of start up was 0.4, which increased to 1.2 at approximately 4 months and 1.6 at the end of the first year of operation. Overall, it seems that the cost of operating a clinic becomes equal to the cost of similar care purchased in the community (ROI = 1) at approximately 3 months after a clinic's opening and flattens out at the end of the first year. The magnitude of the ROI was closely related to the number of visits (a function of the penetration/utilization rate) and the size of the plant population served. Serial monitoring of ROIs is a useful metric in assessing on-site clinic performance and quantifying the effect of new initiatives aimed at increasing a clinic's cost effectiveness.

  2. Environmental performance, profitability, asset utilization, debt monitoring and firm value

    Science.gov (United States)

    Bukit, R. Br; Haryanto, B.; Ginting, P.

    2018-02-01

    The growing issue on firm value shows that firm value is not only determined by the firm ability to increase financial profit, but also by the company's concern in maintaining the environmental condition. The industrial development produces waste that pollutes the environment that has potential to serious impact on the next life. In addition to provide financial benefits, companies are increasingly facing pressure to be socially responsible for the survival of the company. However, past findings demonstrate that the effect of environmental performance, profitability, and asset utilization to the firm’s value are still unclear. This study aims to test whether environmental performance, firm profitability and asset utilization can effectively enhance firm value in two different conditions: intensive debt monitoring and less intensive debt monitoring. Sample of companies is taken from the list of Indonesia Stock Exchange during the period of 2013 to 2015. Using multiple regression analysis, discloses that: in intensive monitoring, managers tend to have high firm value when company has high environmental performance and or high profitability and high asset utilization. Monitoring system needs to be intensified especially for companies with the above characteristics.

  3. A study on development of monitoring and assessment module for sites

    International Nuclear Information System (INIS)

    Park, Se Moon; Yoon, Bong Yo; Kim, Dae Jung; Park, Joo Wan; Kim, Chang Lak

    2006-01-01

    As the development of total management systems for sites along with site environmental information is becoming standard, the system known as the Site Information and Total Environmental database management System (SITES) has been developed over the last two years. The first result was a database management system for storing data obtained from facilities, and a site characterization in addition to an environmental assessment of a site. The SITES database is designed to be effective and practical for use with facility management and safety assessment in relation to Geographic Information Systems. SITES is a total management program, which includes its database, its data analysis system required for site characterization, a safety assessment modeling system and an environment monitoring system. I can contribute to the institutional management of the facility and to its safety reassessment. SITES is composed of two main modules: the SITES Database Module (SDM) and the Monitoring and Assessment (M and A) module. The M and A module is subdivided into two sub-modules: the Safety Assessment System (SAS) and the Site Environmental Monitoring System (SEMS). SAS controls the data (input and output) from the SITES DB for the site safety assessment, whereas SEMS controls the data obtained from the records of the measuring sensors and facilities. The on-line site and environmental monitoring data is managed in SEMS. The present paper introduces the procedure and function of the M and A modules

  4. Using data from monitoring combined sewer overflows to assess, improve, and maintain combined sewer systems

    OpenAIRE

    Montserrat Royuela, Albert; Bosch, Ll.; Kiser, M.A.; Poch, Manuel; Corominas Tabares, Lluís

    2015-01-01

    Using low-cost sensors, data can be collected on the occurrence and duration of overflows in each combined sewer overflow (CSO) structure in a combined sewer system (CSS). The collection and analysis of real data can be used to assess, improve, and maintain CSSs in order to reduce the number and impact of overflows. The objective of this study was to develop a methodology to evaluate the performance of CSSs using low-cost monitoring. This methodology includes (1) assessing the capacity of a C...

  5. PERFORMANCE ASSESSMENT AND GEOMETRIC CALIBRATION OF RESOURCESAT-2

    Directory of Open Access Journals (Sweden)

    P. V. Radhadevi

    2016-06-01

    Full Text Available Resourcesat-2 (RS-2 has successfully completed five years of operations in its orbit. This satellite has multi-resolution and multi-spectral capabilities in a single platform. A continuous and autonomous co-registration, geo-location and radiometric calibration of image data from different sensors with widely varying view angles and resolution was one of the challenges of RS-2 data processing. On-orbit geometric performance of RS-2 sensors has been widely assessed and calibrated during the initial phase operations. Since then, as an ongoing activity, various geometric performance data are being generated periodically. This is performed with sites of dense ground control points (GCPs. These parameters are correlated to the direct geo-location accuracy of the RS-2 sensors and are monitored and validated to maintain the performance. This paper brings out the geometric accuracy assessment, calibration and validation done for about 500 datasets of RS-2. The objectives of this study are to ensure the best absolute and relative location accuracy of different cameras, location performance with payload steering and co-registration of multiple bands. This is done using a viewing geometry model, given ephemeris and attitude data, precise camera geometry and datum transformation. In the model, the forward and reverse transformations between the coordinate systems associated with the focal plane, payload, body, orbit and ground are rigorously and explicitly defined. System level tests using comparisons to ground check points have validated the operational geo-location accuracy performance and the stability of the calibration parameters.

  6. Performance evaluation of the food and environmental monitoring radio-analytical laboratory in Ghana

    International Nuclear Information System (INIS)

    Agyeman, Lilian Ataa

    2016-06-01

    Since the establishment of the Radiation Protection Institute’s Food and Environmental Laboratory in 1988, there has never been any thorough evaluation of the activities of the facility to provide assurance of the quality of analytical results produced by the laboratory. The objective of this study, therefore, was to assess the performance level of the Food and Environmental monitoring laboratory with respect to the requirements for a standard analytical laboratory (IAEA, 1989) and ISO 17025. The study focused on the performance of the Gamma Spectrometry laboratory of the Radiation Protection Institute, Ghana Atomic Energy Commission which has been involved in monitoring of radionuclides in food and environmental samples. In doing that, data from 1988 to 2015 was reviewed to ascertain whether the Laboratory has being performing as required in providing quality results on food and environmental samples measured. Besides this data (records kept), the evaluation also covered some Technical Quality Control measures, such as Energy and Efficiency Calibration, that need to be put in place for such laboratories. The laboratory meets almost all conditions and equipment requirements of IAEA (1989), however the laboratory falls short of the management requirements of ISO 17025. Based on the results it was recommended, among others, that management of the laboratory should ensure there are procedures for how calibration and testing is performed for different types of equipment and also the competence of all who operate specific equipment, perform tests, evaluate results and sign test reports ensured. (au)

  7. New analysis and performance of a wall-current monitor

    Energy Technology Data Exchange (ETDEWEB)

    Suwada, T.; Urano, T.; Kobayashi, H. [National Lab. for High Energy Physics, Tsukuba, Ibaraki (Japan); Tamiya, K.; Asami, A. [Naruto University of Education, Takashima, Naruto-cho, Naruto-shi 772 (Japan)

    1997-09-01

    A new wall-current monitor has been developed in order to reinforce the beam-monitoring system in the PF 2.5-GeV linac for the KEK B-Factory. A prototype monitor was tested for its performance and characteristics. The experimental results in terms of both bench tests and beam tests by single-bunch electron beams were analyzed on the basis of equivalent-circuit models. The frequency response of the monitor agreed well with a lumped equivalent-circuit model for both time- and frequency-domain measurements. The position dependence and its frequency characteristics of the monitor also agreed well with a distributed equivalent-circuit model for both time- and frequency-domain measurements. The rise time of the monitor was about 3 ns, which indicated a poor response for short-pulse beams (<1) ns. The reason could be attributed to the stray inductance of the ceramic solid resistor and not very good frequency response of the ferrite core. (orig.).

  8. New analysis and performance of a wall-current monitor

    International Nuclear Information System (INIS)

    Suwada, T.; Urano, T.; Kobayashi, H.; Tamiya, K.; Asami, A.

    1997-01-01

    A new wall-current monitor has been developed in order to reinforce the beam-monitoring system in the PF 2.5-GeV linac for the KEK B-Factory. A prototype monitor was tested for its performance and characteristics. The experimental results in terms of both bench tests and beam tests by single-bunch electron beams were analyzed on the basis of equivalent-circuit models. The frequency response of the monitor agreed well with a lumped equivalent-circuit model for both time- and frequency-domain measurements. The position dependence and its frequency characteristics of the monitor also agreed well with a distributed equivalent-circuit model for both time- and frequency-domain measurements. The rise time of the monitor was about 3 ns, which indicated a poor response for short-pulse beams (<1) ns. The reason could be attributed to the stray inductance of the ceramic solid resistor and not very good frequency response of the ferrite core. (orig.)

  9. Introduction to radiological performance assessment

    International Nuclear Information System (INIS)

    Moss, G.

    1995-02-01

    A radiological performance assessment is conducted to provide reasonable assurance that performance objectives for low-level radioactive waste (LLW) disposal will be met. Beginning in the early stages of development, a radiological performance assessment continues through the operational phase, and is instrumental in the postclosure of the facility. Fundamental differences exist in the regulation of commercial and defense LLW, but the radiological performance assessment process is essentially the same for both. The purpose of this document is to describe that process in a concise and straightforward manner. This document focuses on radiological performance assessment as it pertains to commercial LLW disposal, but is applicable to US Department of Energy sites as well. Included are discussions on performance objectives, site characterization, and how a performance assessment is conducted. A case study is used to illustrate how the process works as a whole. A bibliography is provided to assist in locating additional information

  10. Assessment of an Anomaly Detector for Jet Engine Health Monitoring

    Directory of Open Access Journals (Sweden)

    Sebastien Borguet

    2011-01-01

    Full Text Available The goal of module performance analysis is to reliably assess the health of the main components of an aircraft engine. A predictive maintenance strategy can leverage this information to increase operability and safety as well as to reduce costs. Degradation undergone by an engine can be divided into gradual deterioration and accidental events. Kalman filters have proven very efficient at tracking progressive deterioration but are poor performers in the face of abrupt events. Adaptive estimation is considered as an appropriate solution to this deficiency. This paper reports the evaluation of the detection capability of an adaptive diagnosis tool on the basis of simulated scenarios that may be encountered during the operation of a commercial turbofan engine. The diagnosis tool combines a Kalman filter and a secondary system that monitors the residuals. This auxiliary component implements a generalised likelihood ratio test in order to detect abrupt events.

  11. The process of performance assessment

    International Nuclear Information System (INIS)

    King, C.M.; Halford, D.K.

    1986-01-01

    An introductory review of the subject of ''Performance Assessment'' will be presented. Emphasis will be placed on the process of performance assessment from the standpoint of defining the process. Performance assessment, from evolving experience at DOE sites, has short-term and long-term subprograms, the components of which will be discussed. The role of mathematical modeling in performance assessment will be addressed including the pros and cons of current approaches. Finally, the ''system/site/technology'' issues as the focal point of this symposium will be reviewed

  12. Personal monitoring and assessment of doses received by radiation workers

    International Nuclear Information System (INIS)

    Swindon, T.N.; Morris, N.D.

    1981-12-01

    The Personal Radiation Monitoring Service operated by the Australian Radiation Laboratory is outlined and the types of monitors used for assessment of doses received by radiation workers are described. The distribution of doses received by radiation workers in different occupational categories is determined. From these distributions, the average doses received have been assessed and the maximum likely additional increase in cancer deaths in Australia as a result of occupational exposure estimated. This increase is shown to be very small. There is, however, a considerable spread of doses received by individuals within occupational groups

  13. Impact of ANSI 2009 criteria for performance testing in TLD personnel monitoring

    International Nuclear Information System (INIS)

    MeenaI, P.; Rakesh, R.B.; Srivastava, Kshama; KoIambe, D.H.; Sapra, B.K.

    2014-01-01

    External Quality Assurance in TLD Personnel Monitoring Service was initiated in 1985, for periodic performance evaluation of various TLD Laboratories through postal exercise. Presently, all the 16 laboratories involved in Personnel Monitoring Service are covered under QA exercise. Since beginning, American National Standards Institute (ANSI) criteria have been adopted for performance testing in QA exercise. Presently, ANSI 2001 performance criteria along with ISO trumpet curve analysis method are being used for performance evaluation. In 2009, ANSI modified the performance evaluation criteria and this study evaluates its impact and feasibility of implementation of ANSI 2009 criteria in the quality assurance program for personnel monitoring. The performance of some laboratories evaluated using both ANSI 2001 and ANSI 2009 criteria have been discussed. The study shows that the ANSI 2009 criteria is more stringent and encourages even distribution of bias and standard deviation. This can be implemented with suitable modifications for performance evaluation

  14. Performance monitoring pavements with thermal segregation in Texas.

    Science.gov (United States)

    2012-04-01

    This project conducted work to investigate the performance of asphalt surface mixtures that exhibited : thermal segregation during construction. From 2004 to 2009, a total of 14 construction projects were : identified for monitoring. Five of these pr...

  15. Wire system aging assessment and condition monitoring (WASCO)

    International Nuclear Information System (INIS)

    Fantoni, P.F.; Nordlund, A.

    2006-04-01

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report describes a method for wire system condition monitoring, developed at the Halden Reactor Project, which is based on Frequency Domain Reflectometry. This method resulted in the development of a system called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. LIRA is composed of a signal generator, a signal analyser and a simulator that can be used to simulate several failure/degradation scenarios and assess the accuracy and sensitivity of the LIRA system. Chapter 5 of this report describes an complementary approach based on positron measurement techniques, used widely in defect physics due to the high sensitivity to micro defects, in particular open volume defects. This report describes in details these methodologies, the results of field experiments and the proposed future work. (au)

  16. Wire system aging assessment and condition monitoring (WASCO)

    Energy Technology Data Exchange (ETDEWEB)

    Fantoni, P.F. [Institutt for energiteknikk (Norway); Nordlund, A. [Chalmers Univ. of Technology (Sweden)

    2006-04-15

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report describes a method for wire system condition monitoring, developed at the Halden Reactor Project, which is based on Frequency Domain Reflectometry. This method resulted in the development of a system called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. LIRA is composed of a signal generator, a signal analyser and a simulator that can be used to simulate several failure/degradation scenarios and assess the accuracy and sensitivity of the LIRA system. Chapter 5 of this report describes an complementary approach based on positron measurement techniques, used widely in defect physics due to the high sensitivity to micro defects, in particular open volume defects. This report describes in details these methodologies, the results of field experiments and the proposed future work. (au)

  17. New Criteria for Assessing the Accuracy of Blood Glucose Monitors meeting, October 28, 2011.

    Science.gov (United States)

    Walsh, John; Roberts, Ruth; Vigersky, Robert A; Schwartz, Frank

    2012-03-01

    Glucose meters (GMs) are routinely used for self-monitoring of blood glucose by patients and for point-of-care glucose monitoring by health care providers in outpatient and inpatient settings. Although widely assumed to be accurate, numerous reports of inaccuracies with resulting morbidity and mortality have been noted. Insulin dosing errors based on inaccurate GMs are most critical. On October 28, 2011, the Diabetes Technology Society invited 45 diabetes technology clinicians who were attending the 2011 Diabetes Technology Meeting to participate in a closed-door meeting entitled New Criteria for Assessing the Accuracy of Blood Glucose Monitors. This report reflects the opinions of most of the attendees of that meeting. The Food and Drug Administration (FDA), the public, and several medical societies are currently in dialogue to establish a new standard for GM accuracy. This update to the FDA standard is driven by improved meter accuracy, technological advances (pumps, bolus calculators, continuous glucose monitors, and insulin pens), reports of hospital and outpatient deaths, consumer complaints about inaccuracy, and research studies showing that several approved GMs failed to meet FDA or International Organization for Standardization standards in postapproval testing. These circumstances mandate a set of new GM standards that appropriately match the GMs' analytical accuracy to the clinical accuracy required for their intended use, as well as ensuring their ongoing accuracy following approval. The attendees of the New Criteria for Assessing the Accuracy of Blood Glucose Monitors meeting proposed a graduated standard and other methods to improve GM performance, which are discussed in this meeting report. © 2012 Diabetes Technology Society.

  18. Continuous Monitoring of Glucose for Type 1 Diabetes: A Health Technology Assessment.

    Science.gov (United States)

    2018-01-01

    Type 1 diabetes is a condition in which the pancreas produces little or no insulin. People with type 1 diabetes must manage their blood glucose levels by monitoring the amount of glucose in their blood and administering appropriate amounts of insulin via injection or an insulin pump. Continuous glucose monitoring may be beneficial compared to self-monitoring of blood glucose using a blood glucose meter. It provides insight into a person's blood glucose levels on a continuous basis, and can identify whether blood glucose levels are trending up or down. We conducted a health technology assessment, which included an evaluation of clinical benefit, value for money, and patient preferences related to continuous glucose monitoring. We compared continuous glucose monitoring with self-monitoring of blood glucose using a finger-prick and a blood glucose meter. We performed a systematic literature search for studies published since January 1, 2010. We created a Markov model projecting the lifetime horizon of adults with type 1 diabetes, and performed a budget impact analysis from the perspective of the health care payer. We also conducted interviews and focus group discussions with people who self-manage their type 1 diabetes or support the management of a child with type 1 diabetes. Twenty studies were included in the clinical evidence review. Compared with self-monitoring of blood glucose, continuous glucose monitoring improved the percentage of time patients spent in the target glycemic range by 9.6% (95% confidence interval 8.0-11.2) to 10.0% (95% confidence interval 6.75-13.25) and decreased the number of severe hypoglycemic events.Continuous glucose monitoring was associated with higher costs and small increases in health benefits (quality-adjusted life-years). Incremental cost-effectiveness ratios (ICERs) ranged from $592,206 to $1,108,812 per quality-adjusted life-year gained in analyses comparing four continuous glucose monitoring interventions to usual care

  19. Development of a Risk-Based Probabilistic Performance-Assessment Method for Long-Term Cover Systems - 2nd Edition

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; ARNOLD, BILL W.; COCHRAN, JOHN R.; TAIRA, RANDAL Y.

    2002-01-01

    A probabilistic, risk-based performance-assessment methodology has been developed to assist designers, regulators, and stakeholders in the selection, design, and monitoring of long-term covers for contaminated subsurface sites. This report describes the method, the software tools that were developed, and an example that illustrates the probabilistic performance-assessment method using a repository site in Monticello, Utah. At the Monticello site, a long-term cover system is being used to isolate long-lived uranium mill tailings from the biosphere. Computer models were developed to simulate relevant features, events, and processes that include water flux through the cover, source-term release, vadose-zone transport, saturated-zone transport, gas transport, and exposure pathways. The component models were then integrated into a total-system performance-assessment model, and uncertainty distributions of important input parameters were constructed and sampled in a stochastic Monte Carlo analysis. Multiple realizations were simulated using the integrated model to produce cumulative distribution functions of the performance metrics, which were used to assess cover performance for both present- and long-term future conditions. Performance metrics for this study included the water percolation reaching the uranium mill tailings, radon gas flux at the surface, groundwater concentrations, and dose. Results from uncertainty analyses, sensitivity analyses, and alternative design comparisons are presented for each of the performance metrics. The benefits from this methodology include a quantification of uncertainty, the identification of parameters most important to performance (to prioritize site characterization and monitoring activities), and the ability to compare alternative designs using probabilistic evaluations of performance (for cost savings)

  20. Satellite Remote Sensing for Monitoring and Assessment

    Science.gov (United States)

    Remote sensing technology has the potential to enhance the engagement of communities and managers in the implementation and performance of best management practices. This presentation will use examples from U.S. numeric criteria development and state water quality monitoring prog...

  1. Performance monitoring in obsessive-compulsive undergraduates: Effects of task difficulty.

    Science.gov (United States)

    Riesel, Anja; Richter, Anika; Kaufmann, Christian; Kathmann, Norbert; Endrass, Tanja

    2015-08-01

    Both obsessive-compulsive disorder and subclinical obsessive-compulsive (OC) symptoms seem to be associated with hyperactive error-related brain activity. The current study examined performance monitoring in subjects with subclinical OC symptoms using a new task with different levels of difficulty. Nineteen subjects with high and 18 subjects with low OC characteristics performed a random dot cinematogram (RDC) task with three levels of difficulty. The high and low OC groups did not differ in error-related negativity (ERN), correct-related negativity (CRN) and performance irrespective of task difficulty. The amplitude of the ERN decreased with increasing difficulty whereas the magnitude of CRN did not vary. ERN and CRN approached in size and topography with increasing difficulty, which suggests that errors and correct responses are processed more similarly. These results add to a growing number of studies that fail to replicate hyperactive performance monitoring in individuals with OC symptoms in task with higher difficulty or requiring learning. Together with these findings our results suggest that the relationship between OC symptoms and performance monitoring may be sensitive to type of task and task characteristics and cannot be observed in a RDC that differs from typically used tasks in difficulty and the amount of response-conflict. Copyright © 2015 Elsevier Inc. All rights reserved.

  2. Technology Performance Level Assessment Methodology.

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, Jesse D.; Bull, Diana L; Malins, Robert Joseph; Costello, Ronan Patrick; Aurelien Babarit; Kim Nielsen; Claudio Bittencourt Ferreira; Ben Kennedy; Kathryn Dykes; Jochem Weber

    2017-04-01

    The technology performance level (TPL) assessments can be applied at all technology development stages and associated technology readiness levels (TRLs). Even, and particularly, at low TRLs the TPL assessment is very effective as it, holistically, considers a wide range of WEC attributes that determine the techno-economic performance potential of the WEC farm when fully developed for commercial operation. The TPL assessment also highlights potential showstoppers at the earliest possible stage of the WEC technology development. Hence, the TPL assessment identifies the technology independent “performance requirements.” In order to achieve a successful solution, the entirety of the performance requirements within the TPL must be considered because, in the end, all the stakeholder needs must be achieved. The basis for performing a TPL assessment comes from the information provided in a dedicated format, the Technical Submission Form (TSF). The TSF requests information from the WEC developer that is required to answer the questions posed in the TPL assessment document.

  3. Fast Flux Test Facility performance monitoring management information: [Final report

    International Nuclear Information System (INIS)

    Newland, D.J.

    1987-09-01

    The purpose of this report is to provide management with performance data on key performance indicators for the month of July, 1987. This report contains the results for key performance indicators divided into two categories of ''overall'' and ''other''. The ''overall'' performance indicators, when considered in the aggregate, provide one means of monitoring overall plant performance

  4. Environmental Monitoring and Assessment Program (EMAP) National Coastal Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Environmental Monitoring and Assessment Program (EMAP) National Coastal Database contains estuarine and coastal data that EMAP and Regional-EMAP have collected...

  5. Performance Assessment and Active System Monitoring for Refrigeration Systems

    DEFF Research Database (Denmark)

    Green, Torben

    to the refrigeration system, is to optimise the total cost of ownership, (TCO). However, directly measuring TCO provides some challenges. It can therefore be beneficial to divide TCO into performance criteria, which can be quantied and measured. For supermarket refrigeration systems the performance criteria can...... is measure by the switch frequency of the compressors in the refrigeration system. The reason is that excessive compressor switching will wear down the compressors too fast and thereby decrease the reliability of the system due to a higher demand for maintenance. The proposed performance function provides...

  6. Internet end-to-end performance monitoring for the High Energy Nuclear and Particle Physics community

    International Nuclear Information System (INIS)

    Matthews, W.

    2000-01-01

    Modern High Energy Nuclear and Particle Physics (HENP) experiments at Laboratories around the world present a significant challenge to wide area networks. Petabytes (1015) or exabytes (1018) of data will be generated during the lifetime of the experiment. Much of this data will be distributed via the Internet to the experiment's collaborators at Universities and Institutes throughout the world for analysis. In order to assess the feasibility of the computing goals of these and future experiments, the HENP networking community is actively monitoring performance across a large part of the Internet used by its collaborators. Since 1995, the pingER project has been collecting data on ping packet loss and round trip times. In January 2000, there are 28 monitoring sites in 15 countries gathering data on over 2,000 end-to-end pairs. HENP labs such as SLAC, Fermi Lab and CERN are using Advanced Network's Surveyor project and monitoring performance from one-way delay of UDP packets. More recently several HENP sites have become involved with NLANR's active measurement program (AMP). In addition SLAC and CERN are part of the RIPE test-traffic project and SLAC is home for a NIMI machine. The large End-to-end performance monitoring infrastructure allows the HENP networking community to chart long term trends and closely examine short term glitches across a wide range of networks and connections. The different methodologies provide opportunities to compare results based on different protocols and statistical samples. Understanding agreement and discrepancies between results provides particular insight into the nature of the network. This paper will highlight the practical side of monitoring by reviewing the special needs of High Energy Nuclear and Particle Physics experiments and provide an overview of the experience of measuring performance across a large number of interconnected networks throughout the world with various methodologies. In particular, results from each project

  7. Internet end-to-end performance monitoring for the High Energy Nuclear and Particle Physics community

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, W.

    2000-02-22

    Modern High Energy Nuclear and Particle Physics (HENP) experiments at Laboratories around the world present a significant challenge to wide area networks. Petabytes (1015) or exabytes (1018) of data will be generated during the lifetime of the experiment. Much of this data will be distributed via the Internet to the experiment's collaborators at Universities and Institutes throughout the world for analysis. In order to assess the feasibility of the computing goals of these and future experiments, the HENP networking community is actively monitoring performance across a large part of the Internet used by its collaborators. Since 1995, the pingER project has been collecting data on ping packet loss and round trip times. In January 2000, there are 28 monitoring sites in 15 countries gathering data on over 2,000 end-to-end pairs. HENP labs such as SLAC, Fermi Lab and CERN are using Advanced Network's Surveyor project and monitoring performance from one-way delay of UDP packets. More recently several HENP sites have become involved with NLANR's active measurement program (AMP). In addition SLAC and CERN are part of the RIPE test-traffic project and SLAC is home for a NIMI machine. The large End-to-end performance monitoring infrastructure allows the HENP networking community to chart long term trends and closely examine short term glitches across a wide range of networks and connections. The different methodologies provide opportunities to compare results based on different protocols and statistical samples. Understanding agreement and discrepancies between results provides particular insight into the nature of the network. This paper will highlight the practical side of monitoring by reviewing the special needs of High Energy Nuclear and Particle Physics experiments and provide an overview of the experience of measuring performance across a large number of interconnected networks throughout the world with various methodologies. In particular, results

  8. Fast beam condition monitor for CMS. Performance and upgrade

    International Nuclear Information System (INIS)

    Leonard, Jessica L.; Bell, Alan; Burtowy, Piotr

    2014-05-01

    The CMS beam and radiation monitoring subsystem BCM1F (Fast Beam Condition Monitor) consists of 8 individual diamond sensors situated around the beam pipe within the pixel detector volume, for the purpose of fast bunch-by-bunch monitoring of beam background and collision products. In addition, effort is ongoing to use BCM1F as an online luminosity monitor. BCM1F will be running whenever there is beam in LHC, and its data acquisition is independent from the data acquisition of the CMS detector, hence it delivers luminosity even when CMS is not taking data. A report is given on the performance of BCM1F during LHC run I, including results of the van der Meer scan and on-line luminosity monitoring done in 2012. In order to match the requirements due to higher luminosity and 25 ns bunch spacing, several changes to the system must be implemented during the upcoming shutdown, including upgraded electronics and precise gain monitoring. First results from Run II preparation are shown.

  9. Fast Beam Condition Monitor for CMS: performance and upgrade

    CERN Document Server

    INSPIRE-00009152; Bell, Alan; Burtowy, Piotr; Dabrowski, Anne; Hempel, Maria; Henschel, Hans; Lange, Wolfgang; Lohmann, Wolfgang; Odell, Nathaniel; Penno, Marek; Pollack, Brian; Przyborowski, Dominik; Ryjov, Vladimir; Stickland, David; Walsh, Roberval; Warzycha, Weronika; Zagozdzinska, Agnieszka

    2014-11-21

    The CMS beam and radiation monitoring subsystem BCM1F (Fast Beam Condition Monitor) consists of 8 individual diamond sensors situated around the beam pipe within the pixel detector volume, for the purpose of fast bunch-by-bunch monitoring of beam background and collision products. In addition, effort is ongoing to use BCM1F as an online luminosity monitor. BCM1F will be running whenever there is beam in LHC, and its data acquisition is independent from the data acquisition of the CMS detector, hence it delivers luminosity even when CMS is not taking data. A report is given on the performance of BCM1F during LHC run I, including results of the van der Meer scan and on-line luminosity monitoring done in 2012. In order to match the requirements due to higher luminosity and 25 ns bunch spacing, several changes to the system must be implemented during the upcoming shutdown, including upgraded electronics and precise gain monitoring. First results from Run II preparation are shown.

  10. Relations Between Self-Reported and Linguistic Monitoring Assessments of Affective Experience in an Extreme Environment.

    Science.gov (United States)

    Smith, Nathan

    2018-03-01

    Approaches for monitoring psychosocial health in challenging environments are needed to maintain the performance and safety of personnel. The purpose of the present research was to examine the relationship between 2 candidate methods (self-reported and linguistics) for monitoring affective experience during extreme environment activities. A single-subject repeated-measures design was used in the present work. The participant was a 46-year-old individual scheduled to complete a self-supported ski expedition across Arctic Greenland. The expedition lasted 28 days, and conditions included severe cold, low stimulation, whiteouts, limited habitability, and threats to life and limb. During the expedition, the participant completed a daily self-report log including assessment of psychological health (perceptions of control and affect) and a video diary (emotion). Video diary entries were subjected to linguistic inquiry and word count analyses before the links between self-report and linguistic data across the expedition period were tested. Similarities in the pattern of self-reported and linguistic assessments emerged across the expedition period. A number of predictable correlations were identified between self-reported and linguistic assessments of affective/emotional experience. Overall, there was better agreement between self-reports and linguistic analytics for indicators of negative affect/emotion. Future research should build on this initial study to further test the links between self-reported affect and emotional states monitored via linguistics. This could help develop methods for monitoring psychological health in extreme environments and support organizational decision making. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.

  11. Strategic environmental assessment and monitoring: Arctic key gaps and bridging pathways

    International Nuclear Information System (INIS)

    Azcárate, Juan; Balfors, Berit; Bring, Arvid; Destouni, Georgia

    2013-01-01

    The Arctic region undergoes rapid and unprecedented environmental change. Environmental assessment and monitoring is needed to understand and decide how to mitigate and/or adapt to the changes and their impacts on society and ecosystems. This letter analyzes the application of strategic environmental assessment (SEA) and the monitoring, based on environmental observations, that should be part of SEA, elucidates main gaps in both, and proposes an overarching SEA framework to systematically link and improve both with focus on the rapidly changing Arctic region. Shortcomings in the monitoring of environmental change are concretized by examples of main gaps in the observations of Arctic hydroclimatic changes. For relevant identification and efficient reduction of such gaps and remaining uncertainties under typical conditions of limited monitoring resources, the proposed overarching framework for SEA application includes components for explicit gap/uncertainty handling and monitoring, systematically integrated within all steps of the SEA process. The framework further links to adaptive governance, which should explicitly consider key knowledge and information gaps that are identified through and must be handled in the SEA process, and accordingly (re)formulate and promote necessary new or modified monitoring objectives for bridging these gaps. (letter)

  12. Direct-reading inhalable dust monitoring--an assessment of current measurement methods.

    Science.gov (United States)

    Thorpe, Andrew; Walsh, Peter T

    2013-08-01

    Direct-reading dust monitors designed specifically to measure the inhalable fraction of airborne dust are not widely available. Current practice therefore often involves comparing the response of photometer-type dust monitors with the concentration measured with a reference gravimetric inhalable sampler, which is used to adjust the dust monitor measurement. However, changes in airborne particle size can result in significant errors in the estimation of inhalable concentration by this method. The main aim of this study was to assess how these dust monitors behave when challenged with airborne dust containing particles in the inhalable size range and also to investigate alternative dust monitors whose response might not be as prone to variations in particle size or that could be adapted to measure inhalable dust concentration. Several photometer-type dust monitors and a Respicon TM, tapered element oscillating microbalance (TEOM) personal dust monitor (PDM) 3600, TEOM 1400, and Dustrak DRX were assessed for the measurement of airborne inhalable dust during laboratory and field trials. The PDM was modified to allow it to sample and measure larger particles in the inhalable size range. During the laboratory tests, the dust monitors and reference gravimetric samplers were challenged inside a large dust tunnel with aerosols of industrial dusts known to present an inhalable hazard and aluminium oxide powders with a range of discrete particle sizes. A constant concentration of each dust type was generated and peak concentrations of larger particles were periodically introduced to investigate the effects of sudden changes in particle size on monitor calibration. The PDM, Respicon, and DataRam photometer were also assessed during field trials at a bakery, joinery, and a grain mill. Laboratory results showed that the Respicon, modified PDM, and TEOM 1400 observed good linearity for all types of dust when compared with measurements made with a reference IOM sampler; the

  13. Monitoring and predicting cognitive state and performance via physiological correlates of neuronal signals.

    Science.gov (United States)

    Russo, Michael B; Stetz, Melba C; Thomas, Maria L

    2005-07-01

    Judgment, decision making, and situational awareness are higher-order mental abilities critically important to operational cognitive performance. Higher-order mental abilities rely on intact functioning of multiple brain regions, including the prefrontal, thalamus, and parietal areas. Real-time monitoring of individuals for cognitive performance capacity via an approach based on sampling multiple neurophysiologic signals and integrating those signals with performance prediction models potentially provides a method of supporting warfighters' and commanders' decision making and other operationally relevant mental processes and is consistent with the goals of augmented cognition. Cognitive neurophysiological assessments that directly measure brain function and subsequent cognition include positron emission tomography, functional magnetic resonance imaging, mass spectroscopy, near-infrared spectroscopy, magnetoencephalography, and electroencephalography (EEG); however, most direct measures are not practical to use in operational environments. More practical, albeit indirect measures that are generated by, but removed from the actual neural sources, are movement activity, oculometrics, heart rate, and voice stress signals. The goal of the papers in this section is to describe advances in selected direct and indirect cognitive neurophysiologic monitoring techniques as applied for the ultimate purpose of preventing operational performance failures. These papers present data acquired in a wide variety of environments, including laboratory, simulator, and clinical arenas. The papers discuss cognitive neurophysiologic measures such as digital signal processing wrist-mounted actigraphy; oculometrics including blinks, saccadic eye movements, pupillary movements, the pupil light reflex; and high-frequency EEG. These neurophysiological indices are related to cognitive performance as measured through standard test batteries and simulators with conditions including sleep loss

  14. Performance of the upgraded NSLS beam position monitors

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Keane, J.

    1997-01-01

    The design and initial performance of the original NSLS beam position monitor were described by J. Bittner and R. Biscardi in 1989. The receiver, which processes signals from four button type pick-up electrodes by time-division multiplexing, operates at the third harmonic of the ring rf frequency (158.66 MHz). It has an output bandwidth of about 2 kHz and a dynamic signal range of approximately 36 dB. A total of 92 receivers have been installed in the NSLS X-ray and VUV storage rings for orbit monitoring and for real time feedback. As part of a continuous effort to improve the NSLS storage ring performance, the BPMs as well as other instrumentation systems have also been undergoing upgrades over the past two years to improve their performance. In the BPM, the front end has been modified to prevent saturation of the rf multiplexing switch, the detector operating point was changed to improve output signal linearity, the dynamic range was increased to over 60 dB, and the gain calibration was standardized to 0.5 volts/mm (i.e. 2 microm/mV). This paper describes the BPM modifications and presents some performance data and measurements on stored beam

  15. Continuous Monitoring of Glucose for Type 1 Diabetes: A Health Technology Assessment

    Science.gov (United States)

    Vandersluis, Stacey; Kabali, Conrad; Djalalov, Sandjar; Gajic-Veljanoski, Olga; Wells, David; Holubowich, Corinne

    2018-01-01

    Background Type 1 diabetes is a condition in which the pancreas produces little or no insulin. People with type 1 diabetes must manage their blood glucose levels by monitoring the amount of glucose in their blood and administering appropriate amounts of insulin via injection or an insulin pump. Continuous glucose monitoring may be beneficial compared to self-monitoring of blood glucose using a blood glucose meter. It provides insight into a person's blood glucose levels on a continuous basis, and can identify whether blood glucose levels are trending up or down. Methods We conducted a health technology assessment, which included an evaluation of clinical benefit, value for money, and patient preferences related to continuous glucose monitoring. We compared continuous glucose monitoring with self-monitoring of blood glucose using a finger-prick and a blood glucose meter. We performed a systematic literature search for studies published since January 1, 2010. We created a Markov model projecting the lifetime horizon of adults with type 1 diabetes, and performed a budget impact analysis from the perspective of the health care payer. We also conducted interviews and focus group discussions with people who self-manage their type 1 diabetes or support the management of a child with type 1 diabetes. Results Twenty studies were included in the clinical evidence review. Compared with self-monitoring of blood glucose, continuous glucose monitoring improved the percentage of time patients spent in the target glycemic range by 9.6% (95% confidence interval 8.0–11.2) to 10.0% (95% confidence interval 6.75–13.25) and decreased the number of severe hypoglycemic events. Continuous glucose monitoring was associated with higher costs and small increases in health benefits (quality-adjusted life-years). Incremental cost-effectiveness ratios (ICERs) ranged from $592,206 to $1,108,812 per quality-adjusted life-year gained in analyses comparing four continuous glucose monitoring

  16. The effect of self-monitoring on Wisconsin Card Sorting Test performance in euthymic patients with bipolar disorder: a pilot study.

    Science.gov (United States)

    Robinson, Lucy J; Gray, John M; Ferrier, I Nicol; Gallagher, Peter

    2016-05-01

    Euthymic patients with bipolar disorder (BD) show executive impairment. Assisting cognitive function with non-pharmacological strategies has not been widely explored in BD. In schizophrenia, concomitant verbalisation (self-monitoring) during executive tests improved performance. The present pilot study assesses the effects of self-monitoring whilst completing the Wisconsin Card Sorting Test (WCST) in BD patients. Thirty-six euthymic BD patients and 42 healthy controls participated. Twenty patients with BD and 20 controls received standard administration and 16 patients and 22 controls used self-monitoring during the test. ANCOVA revealed a significant "group by administration" interaction. Patients who received the standard administration were significantly worse than healthy controls (trials administered: p = .012, η p (2) = 0.17; trials to first category: p = .046, η p (2) = 0.11; failure to maintain set: p = .003, η p (2) = 0.23). BD patients who self-monitored performed significantly better than patients receiving the standard administration (trials to first category: p = .020, η p (2) = 0.17) and showed no significant differences in performance compared to controls. Self-monitoring deserves further investigation as a tool that may be helpful for patients with BD. Further exploration of the utility, generalisability, and stability of the effects of self-monitoring is needed.

  17. Model-based pH monitor for sensor assessment.

    Science.gov (United States)

    van Schagen, Kim; Rietveld, Luuk; Veersma, Alex; Babuska, Robert

    2009-01-01

    Owing to the nature of the treatment processes, monitoring the processes based on individual online measurements is difficult or even impossible. However, the measurements (online and laboratory) can be combined with a priori process knowledge, using mathematical models, to objectively monitor the treatment processes and measurement devices. The pH measurement is a commonly used measurement at different stages in the drinking water treatment plant, although it is a unreliable instrument, requiring significant maintenance. It is shown that, using a grey-box model, it is possible to assess the measurement devices effectively, even if detailed information of the specific processes is unknown.

  18. Performance of an rf beam monitor on the NBS-Los Alamos racetrack microtron

    International Nuclear Information System (INIS)

    Young, L.M.; Cutler, R.I.

    1985-01-01

    A prototype rf beam-position, current, and phase monitor has been used on the 100-keV injector beamline of the racetrack microtron (RTM) where performance was measured with the chopped and bunched beam. This monitor works with both a pulsed beam and a cw beam. The pulsed beam consists of beam pulses with a FWHM of 40 ns. The rf beam monitor was tested with beam currents from approx. 50 to 600 μA. The rf beam monitor will be described and its performance will be reported. 6 refs., 5 figs

  19. Cracking pattern and seismic performance assessment of the Orvieto cathedral

    International Nuclear Information System (INIS)

    De Canio, G.

    2015-01-01

    In this paper are described the in situ cracking pattern measurement and ambient vibration monitoring for the seismic performance evaluation of the Orvieto Cathedral Italy, according the deplacement based safety assessment. This requires, as a first step, the direct measurement of the cracking pattern and dynamic response of the structural macro elements of the cathedral due to weak vibrations induced by traffic and seismic micro tremors. Seismic assessment for this type of structure require also the proper limit states definitions. In fact, in the case historic monuments like churches, due to the presence of specific typology of macro elements: rigid blocks, complex vault systems, slenderness of the walls, presence of wide halls, domes and drums with particular geometry, is necessary to define the proper assessment procedures which are slightly different with respect those required for conventional civil industrial buildings. Regarding the Ambient vibration monitoring, a new approach to estimate the participating masses associated to the macro element kinematics is defined: it is based on the frequency contribution to the Root Main Square Acceleration, obtained by numerical integration of the Power Spectral Density (PSD) function. This information, when associated to the analysis of the Real and Imaginary part of the Cross Spectral Density (CSD) function between the acceleration time histories at different points, allow to identify the principal (at least first and second) mode shapes of the structure.

  20. Event-Related-Potential (ERP) Correlates of Performance Monitoring in Adults With Attention-Deficit Hyperactivity Disorder (ADHD)

    Science.gov (United States)

    Marquardt, Lynn; Eichele, Heike; Lundervold, Astri J.; Haavik, Jan; Eichele, Tom

    2018-01-01

    Introduction: Attention-deficit hyperactivity disorder (ADHD) is one of the most frequent neurodevelopmental disorders in children and tends to persist into adulthood. Evidence from neuropsychological, neuroimaging, and electrophysiological studies indicates that alterations of error processing are core symptoms in children and adolescents with ADHD. To test whether adults with ADHD show persisting deficits and compensatory processes, we investigated performance monitoring during stimulus-evaluation and response-selection, with a focus on errors, as well as within-group correlations with symptom scores. Methods: Fifty-five participants (27 ADHD and 28 controls) aged 19–55 years performed a modified flanker task during EEG recording with 64 electrodes, and the ADHD and control groups were compared on measures of behavioral task performance, event-related potentials of performance monitoring (N2, P3), and error processing (ERN, Pe). Adult ADHD Self-Report Scale (ASRS) was used to assess ADHD symptom load. Results: Adults with ADHD showed higher error rates in incompatible trials, and these error rates correlated positively with the ASRS scores. Also, we observed lower P3 amplitudes in incompatible trials, which were inversely correlated with symptom load in the ADHD group. Adults with ADHD also displayed reduced error-related ERN and Pe amplitudes. There were no significant differences in reaction time (RT) and RT variability between the two groups. Conclusion: Our findings show deviations of electrophysiological measures, suggesting reduced effortful engagement of attentional and error-monitoring processes in adults with ADHD. Associations between ADHD symptom scores, event-related potential amplitudes, and poorer task performance in the ADHD group further support this notion. PMID:29706908

  1. Event-Related-Potential (ERP Correlates of Performance Monitoring in Adults With Attention-Deficit Hyperactivity Disorder (ADHD

    Directory of Open Access Journals (Sweden)

    Lynn Marquardt

    2018-04-01

    Full Text Available Introduction: Attention-deficit hyperactivity disorder (ADHD is one of the most frequent neurodevelopmental disorders in children and tends to persist into adulthood. Evidence from neuropsychological, neuroimaging, and electrophysiological studies indicates that alterations of error processing are core symptoms in children and adolescents with ADHD. To test whether adults with ADHD show persisting deficits and compensatory processes, we investigated performance monitoring during stimulus-evaluation and response-selection, with a focus on errors, as well as within-group correlations with symptom scores.Methods: Fifty-five participants (27 ADHD and 28 controls aged 19–55 years performed a modified flanker task during EEG recording with 64 electrodes, and the ADHD and control groups were compared on measures of behavioral task performance, event-related potentials of performance monitoring (N2, P3, and error processing (ERN, Pe. Adult ADHD Self-Report Scale (ASRS was used to assess ADHD symptom load.Results: Adults with ADHD showed higher error rates in incompatible trials, and these error rates correlated positively with the ASRS scores. Also, we observed lower P3 amplitudes in incompatible trials, which were inversely correlated with symptom load in the ADHD group. Adults with ADHD also displayed reduced error-related ERN and Pe amplitudes. There were no significant differences in reaction time (RT and RT variability between the two groups.Conclusion: Our findings show deviations of electrophysiological measures, suggesting reduced effortful engagement of attentional and error-monitoring processes in adults with ADHD. Associations between ADHD symptom scores, event-related potential amplitudes, and poorer task performance in the ADHD group further support this notion.

  2. The Evolution of the Federal Monitoring and Assessment Center

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement System

    2012-07-31

    The Federal Radiological Monitoring and Assessment Center (FRMAC) is a federal emergency response asset whose assistance may be requested by the Department of Homeland Security (DHS), the Department of Defense (DoD), the Environmental Protection Agency (EPA), the Nuclear Regulatory Commission (NRC), and state and local agencies to respond to a nuclear or radiological incident. It is an interagency organization with representation from the Department of Energy’s National Nuclear Security Administration (DOE/NNSA), the Department of Defense (DoD), the Environmental Protection Agency (EPA), the Department of Health and Human Services (HHS), the Federal Bureau of Investigation (FBI), and other federal agencies. FRMAC, in its present form, was created in 1987 when the radiological support mission was assigned to the DOE’s Nevada Operations Office by DOE Headquarters. The FRMAC asset, including its predecessor entities, was created, grew, and evolved to function as a response to radiological incidents. Radiological emergency response exercises showed the need for a coordinated approach to managing federal emergency monitoring and assessment activities. The mission of FRMAC is to coordinate and manage all federal radiological environmental monitoring and assessment activities during a nuclear or radiological incident within the United States in support of state,local, tribal governments, DHS, and the federal coordinating agency. Radiological emergency response professionals with the DOE’s national laboratories support the Radiological Assistance Program (RAP), National Atmospheric Release Advisory Center (NARAC), the Aerial MeasuringSystem (AMS), and the Radiation Emergency Assistance Center/Training Site (REAC/TS). These teams support the FRMAC to provide: Atmospheric transport modeling; Radiation monitoring; Radiological analysis and data assessments; and Medical advice for radiation injuries In support of field operations, the FRMAC provides geographic

  3. Automatic and objective assessment of alternating tapping performance in Parkinson's disease.

    Science.gov (United States)

    Memedi, Mevludin; Khan, Taha; Grenholm, Peter; Nyholm, Dag; Westin, Jerker

    2013-12-09

    This paper presents the development and evaluation of a method for enabling quantitative and automatic scoring of alternating tapping performance of patients with Parkinson's disease (PD). Ten healthy elderly subjects and 95 patients in different clinical stages of PD have utilized a touch-pad handheld computer to perform alternate tapping tests in their home environments. First, a neurologist used a web-based system to visually assess impairments in four tapping dimensions ('speed', 'accuracy', 'fatigue' and 'arrhythmia') and a global tapping severity (GTS). Second, tapping signals were processed with time series analysis and statistical methods to derive 24 quantitative parameters. Third, principal component analysis was used to reduce the dimensions of these parameters and to obtain scores for the four dimensions. Finally, a logistic regression classifier was trained using a 10-fold stratified cross-validation to map the reduced parameters to the corresponding visually assessed GTS scores. Results showed that the computed scores correlated well to visually assessed scores and were significantly different across Unified Parkinson's Disease Rating Scale scores of upper limb motor performance. In addition, they had good internal consistency, had good ability to discriminate between healthy elderly and patients in different disease stages, had good sensitivity to treatment interventions and could reflect the natural disease progression over time. In conclusion, the automatic method can be useful to objectively assess the tapping performance of PD patients and can be included in telemedicine tools for remote monitoring of tapping.

  4. Monitoring Line-Infrastructure With Multisensor SAR Interferometry : Products and Performance Assessment Metrics

    NARCIS (Netherlands)

    Chang, L.; Dollevoet, R.P.B.J.; Hanssen, R.F.

    2018-01-01

    Satellite radar interferometry (InSAR) is an emerging technique to monitor the stability and health of line-infrastructure assets, such as railways, dams, and pipelines. However, InSAR is an opportunistic approach as the location and occurrence of its measurements (coherent scatterers) cannot be

  5. Comparing personal alpha dosimetry with the conventional area monitoring-time weighting methods of exposure estimation: a Canadian assessment

    International Nuclear Information System (INIS)

    Balint, A.B.; Viljoen, J.

    1988-01-01

    An experimental personal alpha dosimetry program for monitoring exposures of uranium mining facility workers in Canada has been completed. All licenced operating mining facilities were participating. Dosimetry techniques, description of dosimeters used by licences, performance and problems associated with the implementation of the programme as well as technical and administrative advantages and difficulties experienced are discussed. Area monitoring-time weighting methods used and results obtained to determine individual radon and thoron daughter exposure and exposure results generated by using dosimeters are assessed and compared

  6. Assessing the need for a routine monitoring program in three Nuclear Medicine centers in Chile

    International Nuclear Information System (INIS)

    Astudillo, R.; Hermosilla, A.; Diaz-Londono, G.; Garcia, M.

    2015-01-01

    The workers performing different activities with radionuclides in nuclear medicine centers are at potential risk of external exposure and internal contamination. The IAEA Safety Guide No. RS-G-1.2 proposed criteria for determining the need for a routine monitoring program to assess internal contamination. For this purpose, an Excel template containing the IAEA criteria was applied in three nuclear medicine centers in Chile. The results show that it is necessary to carry out a routine monitoring program for five workers who handle 131 I and three for 99m Tc. We propose to implement this template at a national level in order to improve the conditions of radiation protection in the participating centers. (authors)

  7. In-flight spectral performance monitoring of the Airborne Prism Experiment

    NARCIS (Netherlands)

    Odorico, D' P.; Alberti, E.; Schaepman, M.E.

    2010-01-01

    Spectral performance of an airborne dispersive pushbroom imaging spectrometer cannot be assumed to be stable over a whole flight season given the environmental stresses present during flight. Spectral performance monitoring during flight is commonly accomplished by looking at selected absorption

  8. Federal Radiological Monitoring and Assessment Center (FRMAC): Overview of FRMAC operations

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this Management Overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) is to explain the federal preparation for a radiological accident and to describe the subsequent response activities which provide radiological monitoring and assessment outside the boundaries of the monitoring which support the radiological accident site. In the event of a radiological accident, federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the accident scene under the umbrella of the Federal Radiological Emergency Response Plan (FRERP). This cooperative effort will assure the state(s) and the Lead Federal Agency (LFA) that all federal technical assistance is fully supporting their efforts to protect the public and will provide these monitoring results in a working data center for immediate use by the state(s) and LFA decision makers. The federal agencies do not relinquish their statutory responsibilities. However, the mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibility

  9. Monitoring User-System Performance in Interactive Retrieval Tasks

    NARCIS (Netherlands)

    Boldareva, L.; de Vries, A.P.; Hiemstra, Djoerd

    Monitoring user-system performance in interactive search is a challenging task. Traditional measures of retrieval evaluation, based on recall and precision, are not of any use in real time, for they require a priori knowledge of relevant documents. This paper shows how a Shannon entropy-based

  10. Assessment without Testing: Using Performance Measures Embedded in a Technology-Based Instructional Program as Indicators of Reading Ability

    Science.gov (United States)

    Mitchell, Alison; Baron, Lauren; Macaruso, Paul

    2018-01-01

    Screening and monitoring student reading progress can be costly and time consuming. Assessment embedded within the context of online instructional programs can capture ongoing student performance data while limiting testing time outside of instruction. This paper presents two studies that examined the validity of using performance measures from a…

  11. The effects of performance-based assessment criteria on student performance and self-assessment skills

    NARCIS (Netherlands)

    Fastré, Greet; Van der Klink, Marcel; Van Merriënboer, Jeroen

    2010-01-01

    Fastré, G. M. J., Van der Klink, M. R., & Van Merriënboer, J. J. G. (2010). The effects of performance-based assessment criteria on student performance and self-assessment skills. Advances in Health Science Education, 15(4), 517-532.

  12. Lawrence Livermore National Laboratory low-level waste systems performance assessment

    International Nuclear Information System (INIS)

    1990-11-01

    This Low-Level Radioactive Waste (LLW) Systems Performance Assessment (PA) presents a systematic analysis of the potential risks posed by the Lawrence Livermore National Laboratory (LLNL) waste management system. Potential risks to the public and environment are compared to established performance objectives as required by DOE Order 5820.2A. The report determines the associated maximum individual committed effective dose equivalent (CEDE) to a member of the public from LLW and mixed waste. A maximum annual CEDE of 0.01 mrem could result from routine radioactive liquid effluents. A maximum annual CEDE of 0.003 mrem could result from routine radioactive gaseous effluents. No other pathways for radiation exposure of the public indicated detectable levels of exposure. The dose rate, monitoring, and waste acceptance performance objectives were found to be adequately addressed by the LLNL Program. 88 refs., 3 figs., 17 tabs

  13. No Reference Video-Quality-Assessment Model for Monitoring Video Quality of IPTV Services

    Science.gov (United States)

    Yamagishi, Kazuhisa; Okamoto, Jun; Hayashi, Takanori; Takahashi, Akira

    Service providers should monitor the quality of experience of a communication service in real time to confirm its status. To do this, we previously proposed a packet-layer model that can be used for monitoring the average video quality of typical Internet protocol television content using parameters derived from transmitted packet headers. However, it is difficult to monitor the video quality per user using the average video quality because video quality depends on the video content. To accurately monitor the video quality per user, a model that can be used for estimating the video quality per video content rather than the average video quality should be developed. Therefore, to take into account the impact of video content on video quality, we propose a model that calculates the difference in video quality between the video quality of the estimation-target video and the average video quality estimated using a packet-layer model. We first conducted extensive subjective quality assessments for different codecs and video sequences. We then model their characteristics based on parameters related to compression and packet loss. Finally, we verify the performance of the proposed model by applying it to unknown data sets different from the training data sets used for developing the model.

  14. Performance assessment calculational exercises

    International Nuclear Information System (INIS)

    Barnard, R.W.; Dockery, H.A.

    1990-01-01

    The Performance Assessment Calculational Exercises (PACE) are an ongoing effort coordinated by Yucca Mountain Project Office. The objectives of fiscal year 1990 work, termed PACE-90, as outlined in the Department of Energy Performance Assessment (PA) Implementation Plan were to develop PA capabilities among Yucca Mountain Project (YMP) participants by calculating performance of a Yucca Mountain (YM) repository under ''expected'' and also ''disturbed'' conditions, to identify critical elements and processes necessary to assess the performance of YM, and to perform sensitivity studies on key parameters. It was expected that the PACE problems would aid in development of conceptual models and eventual evaluation of site data. The PACE-90 participants calculated transport of a selected set of radionuclides through a portion of Yucca Mountain for a period of 100,000 years. Results include analyses of fluid-flow profiles, development of a source term for radionuclide release, and simulations of contaminant transport in the fluid-flow field. Later work included development of a problem definition for perturbations to the originally modeled conditions and for some parametric sensitivity studies. 3 refs

  15. Development of a computerized system for performance monitoring and diagnostics in nuclear power plants

    International Nuclear Information System (INIS)

    Chou, G.H.; Chao, H.J.

    1995-01-01

    An on-line computerized system for thermal performance monitoring and diagnostics has been developed at the Institute of Nuclear Energy Research (INER). It was the product of the ChinShan plant performance Monitoring, Analysis and Diagnostics Expert System (CS-MADES) project sponsored by Taiwan Power Company (TPC). The system can carry out turbine performance monitoring and analysis during normal operation, and yield diagnostic results of component degradation after finding out the missing generation problems. Three subsystems were generated to support the whole system framework. They are Test Data Processing Subsystem (TDPS), On-line Monitoring and Analysis Subsystem (OMAS), and Thermal Performance Diagnostics Expert System (TPDES). Some visible benefits have been gained so far through the prototype system installed at the Chinshan nuclear power station

  16. Passive and Active Monitoring on a High Performance Research Network

    International Nuclear Information System (INIS)

    Matthews, Warren

    2001-01-01

    The bold network challenges described in ''Internet End-to-end Performance Monitoring for the High Energy and Nuclear Physics Community'' presented at PAM 2000 have been tackled by the intrepid administrators and engineers providing the network services. After less than a year, the BaBar collaboration has collected almost 100 million particle collision events in a database approaching 165TB (Tera=10 12 ). Around 20TB has been exported via the Internet to the BaBar regional center at IN2P3 in Lyon, France, for processing and around 40 TB of simulated events have been imported to SLAC from Lawrence Livermore National Laboratory (LLNL). An unforseen challenge has arisen due to recent events and highlighted security concerns at DoE funded labs. New rules and regulations suggest it is only a matter of time before many active performance measurements may not be possible between many sites. Yet, at the same time, the importance of understanding every aspect of the network and eradicating packet loss for high throughput data transfers has become apparent. Work at SLAC to employ passive monitoring using netflow and OC3MON is underway and techniques to supplement and possibly replace the active measurements are being considered. This paper will detail the special needs and traffic characterization of a remarkable research project, and how the networking hurdles have been resolved (or not) to achieve the required high data throughput. Results from active and passive measurements will be compared, and methods for achieving high throughput and the effect on the network will be assessed along with tools that directly measure throughput and applications used to actually transfer data

  17. Passive and Active Monitoring on a High Performance Research Network.

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Warren

    2001-05-01

    The bold network challenges described in ''Internet End-to-end Performance Monitoring for the High Energy and Nuclear Physics Community'' presented at PAM 2000 have been tackled by the intrepid administrators and engineers providing the network services. After less than a year, the BaBar collaboration has collected almost 100 million particle collision events in a database approaching 165TB (Tera=10{sup 12}). Around 20TB has been exported via the Internet to the BaBar regional center at IN2P3 in Lyon, France, for processing and around 40 TB of simulated events have been imported to SLAC from Lawrence Livermore National Laboratory (LLNL). An unforseen challenge has arisen due to recent events and highlighted security concerns at DoE funded labs. New rules and regulations suggest it is only a matter of time before many active performance measurements may not be possible between many sites. Yet, at the same time, the importance of understanding every aspect of the network and eradicating packet loss for high throughput data transfers has become apparent. Work at SLAC to employ passive monitoring using netflow and OC3MON is underway and techniques to supplement and possibly replace the active measurements are being considered. This paper will detail the special needs and traffic characterization of a remarkable research project, and how the networking hurdles have been resolved (or not!) to achieve the required high data throughput. Results from active and passive measurements will be compared, and methods for achieving high throughput and the effect on the network will be assessed along with tools that directly measure throughput and applications used to actually transfer data.

  18. Performance assessment and adoption processes of an information monitoring and diagnostic system prototype; FINAL

    International Nuclear Information System (INIS)

    Piette, Mary Ann

    1999-01-01

    This report addresses the problem that buildings do not perform as well as anticipated during design. We partnered with an innovative building operator to evaluate a prototype Information Monitoring and Diagnostic System (IMDS). The IMDS consists of high-quality measurements archived each minute, a data visualization tool, and a web-based capability. The operators recommend similar technology be adopted in other buildings. The IMDS has been used to identify and correct a series of control problems. It has also allowed the operators to make more effective use of the building control system, freeing up time to take care of other tenant needs. They believe they have significantly improved building comfort, potentially improving tenant health, and productivity. The reduction in hours to operate the building are worth about$20,000 per year, which could pay for the IMDS in about five years. A control system retrofit based on findings from the IMDS is expected to reduce energy use by 20 percent over the next year, worth over$30,000 per year. The main conclusion of the model-based chiller fault detection work is that steady-state models can be used as reference models to monitor chiller operation and detect faults. The ability of the IMDS to measure cooling load and chiller power to one-percent accuracy with a one-minute sampling interval permits detection of additional faults. Evolutionary programming techniques were also evaluated, showing promise in the detection of patterns in building data. We also evaluated two technology adoption processes, radical and routine. In routine adoption, managers enhance features of existing products that are already well understood. In radical adoption, innovative building managers introduce novel technology into their organizations without using the rigorous payback criteria used in routine innovations

  19. Design and expected performance of the new SLS beam size monitor

    CERN Document Server

    Milas, N.; Saa Hernandez, A.; Schlott, V.; Streun, A.; Andersson, A.; Breunlin, J.

    2012-01-01

    The vertical emittance minimization campaign at SLS, realized in the context of the TIARA WP6, has already achieved the world's smallest vertical beam size of 3.6 μm, corresponding to a vertical emittance of 0.9 pm, in a synchrotron light source. The minimum value reached for the vertical emittance is only about five times larger than the quantum limit of 0.2 pm. However, the resolution limit of the present SLS emittance monitor has also been reached during this campaign, thus, to further continue the emittance minimization program the construction of an improved second monitor is necessary. In this paper we present the design and studies on the performance of this new monitor based on the image formation method using vertically polarized synchrotron radiation in the visible and UV spectral ranges. This new monitor includes an additional feature, providing the possibility of performing full interferometric measurement by the use of a set of vertical obstacles that can be driven on the light path. Simulations...

  20. Plug-and-play monitoring and performance optimization for industrial automation processes

    CERN Document Server

    Luo, Hao

    2017-01-01

    Dr.-Ing. Hao Luo demonstrates the developments of advanced plug-and-play (PnP) process monitoring and control systems for industrial automation processes. With aid of the so-called Youla parameterization, a novel PnP process monitoring and control architecture (PnP-PMCA) with modularized components is proposed. To validate the developments, a case study on an industrial rolling mill benchmark is performed, and the real-time implementation on a laboratory brushless DC motor is presented. Contents PnP Process Monitoring and Control Architecture Real-Time Configuration Techniques for PnP Process Monitoring Real-Time Configuration Techniques for PnP Performance Optimization Benchmark Study and Real-Time Implementation Target Groups Researchers and students of Automation and Control Engineering Practitioners in the area of Industrial and Production Engineering The Author Hao Luo received the Ph.D. degree at the Institute for Automatic Control and Complex Systems (AKS) at the University of Duisburg-Essen, Germany, ...

  1. Performance monitoring and error significance in patients with obsessive-compulsive disorder.

    Science.gov (United States)

    Endrass, Tanja; Schuermann, Beate; Kaufmann, Christan; Spielberg, Rüdiger; Kniesche, Rainer; Kathmann, Norbert

    2010-05-01

    Performance monitoring has been consistently found to be overactive in obsessive-compulsive disorder (OCD). The present study examines whether performance monitoring in OCD is adjusted with error significance. Therefore, errors in a flanker task were followed by neutral (standard condition) or punishment feedbacks (punishment condition). In the standard condition patients had significantly larger error-related negativity (ERN) and correct-related negativity (CRN) ampliudes than controls. But, in the punishment condition groups did not differ in ERN and CRN amplitudes. While healthy controls showed an amplitude enhancement between standard and punishment condition, OCD patients showed no variation. In contrast, group differences were not found for the error positivity (Pe): both groups had larger Pe amplitudes in the punishment condition. Results confirm earlier findings of overactive error monitoring in OCD. The absence of a variation with error significance might indicate that OCD patients are unable to down-regulate their monitoring activity according to external requirements. Copyright 2010 Elsevier B.V. All rights reserved.

  2. Reducing BWR O and M costs through on-line performance monitoring

    International Nuclear Information System (INIS)

    Jonas, T.; Gross, R.; Logback, F.; Josyula, R.

    1995-01-01

    Competition in the electric power industry has placed significant emphasis on reducing operating and maintenance (O and M) costs at nuclear facilities. Therefore, on-line performance monitoring to locate power losses for boiling water reactor (BWR) plants is creating tremendous interest. In addition, the ability to automate activities such as data collection, analysis, and reporting increases the efficiency of plant engineers and gives them more time to concentrate on solving plant efficiency problems. This capability is now available with a unique software product called GEBOPS. GE Nuclear Energy, in conjunction with Joint Venture partner Black and Veatch, has undertaken development of the General Electric/Black and Veatch On-line Performance System (GEBOPS), an on-line performance monitoring system for BWR plants. The experience and expertise of GE Nuclear Energy with BWR plants, coupled with the proven on-line monitoring software development experience and capability of Black and Veatch, provide the foundation for a unique product which addresses the needs of today's BWR plants

  3. Monitoring of performance and training in rowing.

    Science.gov (United States)

    Mäestu, Jarek; Jürimäe, Jaak; Jürimäe, Toivo

    2005-01-01

    Rowing is a strength-endurance type of sport and competition performance depends on factors such as aerobic and anaerobic power, physical power, rowing technique and tactics. Therefore, a rower has to develop several capacities in order to be successful and a valid testing battery of a rower has to include parameters that are highly related to rowing performance. Endurance training is the mainstay in rowing. For the 2000 m race, power training at high velocities should be preferred to resistance training at low velocities in order to train more specifically during the off-season. The specific training of the international rower has to be approximately 70% of the whole training time. Several studies have reported different biochemical parameters for monitoring the training of rowers. There is some evidence that plasma leptin is more sensitive to training volume changes than specific stress hormones (e.g. cortisol, testosterone, growth hormone). In rowing, the stress hormone reactions to training volume and/or intensity changes are controversial. The Recovery-Stress Questionnaire for Athletes measures both stress and recovery, and may therefore be more effective than the previously used Borg ratio scale or the Profile of Mood States, which both focus mainly on the stress component. In the future, probably the most effective way to evaluate the training of rowers is to monitor both stress and recovery components at the same time, using both psychometric data together with the biochemical and performance parameters.

  4. The use of check valve performance data to support new concepts (probabilistic risk assessment, condition monitoring) for check valve program

    Energy Technology Data Exchange (ETDEWEB)

    Hart, K.A.; Gower, D.

    1996-12-01

    The concept of developing an integrated check valve database based on the Nuclear Power Reliability Data System (NPRDS) data was presented at the last Symposium. The Nuclear Industry Check Valve Group (NIC), working in cooperation with the Oak Ridge National Laboratory (ORNL), has completed an operational database of check valve performance from 1984 to the present. NIC has committed to the nuclear industry to periodically update the data and maintain this information accessible. As the new concepts of probabilistic risk analysis and condition monitoring are integrated into the American Society of Mechanical Engineers (ASME) Code, a critical element will be performance data. From check valve performance data, feasible failure modes and rates can be established. When a failure rate or frequency of failures can be established based on a significant enough population (sampling), a more solid foundation for focusing resources and determining appropriate frequencies and testing can be determined. The presentation will give the updated status of the NIC Check Valve Performance Database covering (1) methodology used to combine the original ORNL data; (2) process/controls established for continuing update and refinement of the data; (3) discussion of how this data is being utilized by (a) OM-22 for condition monitoring, and (b) risk-based inservice testing work of Westinghouse Owners` Group; and (4) results/trends of data evaluations. At the 1994 Symposium, ORNL provided an update as of 1991 to their original work of 1984 -1990 which they had performed to characterize check valve degradations and failures in the nuclear industry. These characterizations will be updated to 1995 and additional reviews provided to give insight into the current condition and trends of check valve performance.

  5. The use of check valve performance data to support new concepts (probabilistic risk assessment, condition monitoring) for check valve program

    International Nuclear Information System (INIS)

    Hart, K.A.; Gower, D.

    1996-01-01

    The concept of developing an integrated check valve database based on the Nuclear Power Reliability Data System (NPRDS) data was presented at the last Symposium. The Nuclear Industry Check Valve Group (NIC), working in cooperation with the Oak Ridge National Laboratory (ORNL), has completed an operational database of check valve performance from 1984 to the present. NIC has committed to the nuclear industry to periodically update the data and maintain this information accessible. As the new concepts of probabilistic risk analysis and condition monitoring are integrated into the American Society of Mechanical Engineers (ASME) Code, a critical element will be performance data. From check valve performance data, feasible failure modes and rates can be established. When a failure rate or frequency of failures can be established based on a significant enough population (sampling), a more solid foundation for focusing resources and determining appropriate frequencies and testing can be determined. The presentation will give the updated status of the NIC Check Valve Performance Database covering (1) methodology used to combine the original ORNL data; (2) process/controls established for continuing update and refinement of the data; (3) discussion of how this data is being utilized by (a) OM-22 for condition monitoring, and (b) risk-based inservice testing work of Westinghouse Owners' Group; and (4) results/trends of data evaluations. At the 1994 Symposium, ORNL provided an update as of 1991 to their original work of 1984 -1990 which they had performed to characterize check valve degradations and failures in the nuclear industry. These characterizations will be updated to 1995 and additional reviews provided to give insight into the current condition and trends of check valve performance

  6. Development and implementation of a PV performance monitoring system based on inverter measurements

    DEFF Research Database (Denmark)

    Spataru, Sergiu; Gavriluta, Anamaria Florina; Maaløe, Lars

    2016-01-01

    Performance monitoring and fault detection systems have become necessary for decreasing operation and maintenance cost in large photovoltaic (PV) plants, as well for maximizing plan yield and lifetime. We expect a similar development for residential and commercial PV system applications, where...... the inverter’s own monitoring and communication capabilities. We also aim to lower the implementation cost, by using a simple, but accurate performance monitoring approach, and show the practical issues that can arise when implementing such a system....

  7. Vibration-based monitoring for performance evaluation of flexible civil structures in Japan

    Science.gov (United States)

    FUJINO, Yozo

    2018-01-01

    The vibration-based monitoring of flexible civil structures and performance evaluation from this monitoring are reviewed, with an emphasis on research and practice in Japan and the author’s experiences. Some new findings and unexpected vibrations from the monitoring of real bridges and buildings are reported to emphasize the importance of monitoring. Future developments and applications of vibration-based monitoring to civil infrastructure management are also described. Many examples are taken from the author’s past 30 years’ experience of research on bridge dynamics. PMID:29434082

  8. Big data and high-performance analytics in structural health monitoring for bridge management

    Science.gov (United States)

    Alampalli, Sharada; Alampalli, Sandeep; Ettouney, Mohammed

    2016-04-01

    Structural Health Monitoring (SHM) can be a vital tool for effective bridge management. Combining large data sets from multiple sources to create a data-driven decision-making framework is crucial for the success of SHM. This paper presents a big data analytics framework that combines multiple data sets correlated with functional relatedness to convert data into actionable information that empowers risk-based decision-making. The integrated data environment incorporates near real-time streams of semi-structured data from remote sensors, historical visual inspection data, and observations from structural analysis models to monitor, assess, and manage risks associated with the aging bridge inventories. Accelerated processing of dataset is made possible by four technologies: cloud computing, relational database processing, support from NOSQL database, and in-memory analytics. The framework is being validated on a railroad corridor that can be subjected to multiple hazards. The framework enables to compute reliability indices for critical bridge components and individual bridge spans. In addition, framework includes a risk-based decision-making process that enumerate costs and consequences of poor bridge performance at span- and network-levels when rail networks are exposed to natural hazard events such as floods and earthquakes. Big data and high-performance analytics enable insights to assist bridge owners to address problems faster.

  9. Plasma, a plant safety monitoring and assessment system for VVER-440 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hornaes, A.; Hulsund, J. E. [Institutt for energiteknikk (IFE), OECD Halden Reactor Project, Halden (Norway); Lipcsei, S.; Major, Cs.; Racz, A.; Vegh, J. [KFKI, Atomic Energy Research Institute, Budapest (Hungary); Eiler, J. [Paks, Nuclear Power Plant Ltd, Paks (Hungary)

    1999-05-15

    The objective with the Plant Safety Monitoring and Assessment System (PLASMA) is to develop an operator support system to support the execution of new symptom-based Emergency Operating Procedures for application in VVER reactors, with the Paks NPP in Hungary as the target plant. Many of the VVER reactors are rewriting their EOPs to comply more with Western standards of symptom-based EOPs. In this connection it is desirable to improve the data validation, information integration and presentation for operators when executing the EOPs. The entry-point to a symptom-oriented procedure is defined by the occurrence of a well-defined reactor operation status, with all its symptoms. However, the application of the EOF benefits from an operator support system, which performs plant status and symptom identification reliably and accurately. The development of the PLASMA system is a joint venture between Institutt for energiteknikk (IFE) and KFKI with the NPP Paks as the target plant. The project has been initiated and partly funded by the Science and Technology Agency (STA), Japan through the OECD NEA assistance program. In Hungary, considerable effort has concentrated on the safety reassessment of the Paks NPP and new EOPs are being written, but no comprehensive Operator Support System (OSS) for plant safety assessment is installed. Some safety parameter display functions are incorporated into diverse operator support systems, but an online 'plant safety monitoring and assessment system' is still missing. The present project comprises designing, constructing, testing and installing such an OSS, which to a great extent could support plant operators in their safety assessment work (author) (ml)

  10. Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

    International Nuclear Information System (INIS)

    Koslow, Karen; Rood, Arthur

    2009-01-01

    This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of waste characteristics, and the

  11. Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Karen Koslow

    2009-08-31

    This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of

  12. Operational readiness of filtered air discharge monitoring systems

    International Nuclear Information System (INIS)

    Lafortune, J.F.; Jamieson, T.J.

    1993-08-01

    An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report

  13. Laboratory and field based evaluation of chromatography related performance of the Monitor for AeRosols and Gases in ambient Air (MARGA)

    Science.gov (United States)

    The semi-continuous Monitor for AeRosols and Gases in Ambient air (MARGA) was evaluated using laboratory and field data with a focus on chromatography. The performance and accuracy assessment revealed various errors and uncertainties resulting from mis-identification and mis-int...

  14. Federal Radiological Monitoring and Assessment Center Overview of FRMAC Operations

    International Nuclear Information System (INIS)

    1998-01-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response Plan. This cooperative effort will ensure that all federal radiological assistance fully supports their efforts to protect the public. the mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of Federal Radiological Monitoring and Assessment Center (FRMAC) describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas

  15. Assessing COSMO-SkyMed capability for crops identification and monitoring

    Science.gov (United States)

    Guarini, R.; Dini, L.

    2015-12-01

    In the last decade, it has been possible to better understand the impact of agricultural human practices on the global environmental change at different spatial (from local to global) and time (from seasonal to decadal) scales. This has been achieved thanks to: big dataset continuously acquired by Earth Observation (EO) satellites; the improved capabilities of remote sensing techniques in extracting valuable information from the EO datasets; the new EO data policy which allowed unrestricted data usage; the net technologies which allowed to quickly and easily share national, international and market-derived information; an increasingly performing computing technology which allows to massively process large amount of data easier and at decreasing costs. To better understand the environmental impacts of agriculture and to monitor the consequences of human agricultural activities on the biosphere, scientists require to better identify crops and monitor crop conditions over time and space. Traditionally, NDVI time series maps derived from optical sensors have been used to this aim. As well-known this important source of information is conditioned by cloud cover. Unlike passive systems, synthetic aperture radar (SAR) ones are almost insensitive to atmospheric influences; thus, they are especially suitable for crop identification and condition monitoring. Among the other SAR systems currently in orbit, the Italian Space Agency (ASI) COSMO Sky-Med® (CSK®) constellation (X-band, frequency 9.6 GHz, wavelength 3.1 cm), especially for its peculiar high revisit capability (up to four images in 16 days with same acquisition geometry) seems to be particular suitable for providing information in addition and/or in alternative to other optical EO systems. To assess the capability of the CSK® constellation in identifying crops and in monitoring crops condition in 2013 ASI started the "AGRICIDOT" project. Some of the main project achievements will be presented at the congress.

  16. Monitoring individual and joint action outcomes in duet music performance

    DEFF Research Database (Denmark)

    Loehr, Janeen; Kourtis, Dimitrios; Vesper, Cordula

    2013-01-01

    We investigated whether people monitor the outcomes of their own and their partners’ individual actions as well as the outcome of their combined actions when performing joint actions together. Pairs of pianists memorized both parts of a piano duet. Each pianist then performed one part while their...

  17. Monitoring of performance management using Quality Assurance Indicators and ISO requirement

    Directory of Open Access Journals (Sweden)

    Dargahi H

    2007-06-01

    Full Text Available Background: Quality assurance is a prevention-oriented system that can be used to improve the quality of care, increase productivity and monitor the performance management in clinical laboratories. ISO 9001: 2000 requirements are a collection of management and technical systems designed to implement quality assurance and monitor performance management in organizations. Methods: A checklist was prepared to monitor the preanalytical, analytical and postanalytical stages of laboratory performance management in 16 areas and all laboratory activities in 14 of the clinical laboratories of the Tehran University of Medical Sciences (TUMS hospitals. Collected data were stored and statistically analyzed using SPSS software. Results: The best performance, in which 77.73% of quality assurance indicators were observed, was found in Sina Hospital. However, only 57.56% of these indicators were fulfilled at Farabi Hospital, with the lowest-level performance among the clinical laboratories of TUMS hospitals. The highest level of compliance with quality assurance indicators was in the hematology departments and for facility demands in management areas. Overall, quality assurance indicators were appropriately followed in only 7% of the clinical laboratories. Conclusion: The average quality assurance observation rate in the clinical laboratories studied was 67.22%, which is insufficient and must be remedied with stricter enforcement of the ISO 9001: 2000 regulations.

  18. DOE site performance assessment activities

    International Nuclear Information System (INIS)

    1990-07-01

    Information on performance assessment capabilities and activities was collected from eight DOE sites. All eight sites either currently dispose of low-level radioactive waste (LLW) or plan to dispose of LLW in the near future. A survey questionnaire was developed and sent to key individuals involved in DOE Order 5820.2A performance assessment activities at each site. The sites surveyed included: Hanford Site (Hanford), Idaho National Engineering Laboratory (INEL), Los Alamos National Laboratory (LANL), Nevada Test Site (NTS), Oak Ridge National Laboratory (ORNL), Paducah Gaseous Diffusion Plant (Paducah), Portsmouth Gaseous Diffusion Plant (Portsmouth), and Savannah River Site (SRS). The questionnaire addressed all aspects of the performance assessment process; from waste source term to dose conversion factors. This report presents the information developed from the site questionnaire and provides a comparison of site-specific performance assessment approaches, data needs, and ongoing and planned activities. All sites are engaged in completing the radioactive waste disposal facility performance assessment required by DOE Order 5820.2A. Each site has achieved various degrees of progress and have identified a set of critical needs. Within several areas, however, the sites identified common needs and questions

  19. Performance Monitoring Techniques Supporting Cognitive Optical Networking

    DEFF Research Database (Denmark)

    Caballero Jambrina, Antonio; Borkowski, Robert; Zibar, Darko

    2013-01-01

    High degree of heterogeneity of future optical networks, such as services with different quality-of-transmission requirements, modulation formats and switching techniques, will pose a challenge for the control and optimization of different parameters. Incorporation of cognitive techniques can help...... to solve this issue by realizing a network that can observe, act, learn and optimize its performance, taking into account end-to-end goals. In this letter we present the approach of cognition applied to heterogeneous optical networks developed in the framework of the EU project CHRON: Cognitive...... Heterogeneous Reconfigurable Optical Network. We focus on the approaches developed in the project for optical performance monitoring, which enable the feedback from the physical layer to the cognitive decision system by providing accurate description of the performance of the established lightpaths....

  20. Texas' performance assessment work

    International Nuclear Information System (INIS)

    Charbeneau, R.J.; Hertel, N.E.; Pollard, C.G.

    1990-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority is completing two years of detailed on-site suitability studies of a potential low-level radioactive waste disposal site in Hudspeth County, Texas. The data from these studies have been used to estimate site specific parameters needed to do a performance assessment of the site. The radiological impacts of the site have been analyzed as required for a license application. The approach adopted for the performance assessment was to use simplified and yet conservative assumptions with regard to releases, radionuclide transport, and dose calculations. The methodologies employed in the performance assessment are reviewed in the paper. Rather than rely on a single computer code, a modular approach to the performance assessment was selected. The HELP code was used to calculate the infiltration rate through the trench covers and the amount of leachate released from this arid site. Individual pathway analyses used spreadsheet calculations. These calculations were compared with those from other computer models including CRRIS, INGDOS, PATHRAE, and MICROSHIELD copyright, and found to yield conservative estimates of the effective whole body dose. The greatest difficulty in performing the radiological assessment of the site was the selection of reasonable source terms for release into the environment. A surface water pathway is unreasonable for the site. Though also unlikely, the groundwater pathway with exposure through a site boundary well was found to yield the largest calculated dose. The more likely pathway including transport of leachate from the facility through the unsaturated zone and returning to the ground surface yields small doses. All calculated doses associated with normal releases of radioactivity are below the regulatory limits

  1. Tractor performance monitor based on a single-chip microcomputer

    Energy Technology Data Exchange (ETDEWEB)

    Bedri, A.R.; Marley, S.J.; Buchelle, W.F.; Smay, T.A.

    1981-01-01

    A tractor performance monitor based on a single-chip microcomputer was developed to measure ground speed, slip, fuel consumption (rate and total), total area, theoretical time, and total time. Transducers used are presented in detail. 5 refs.

  2. Cluster analysis of received constellations for optical performance monitoring

    NARCIS (Netherlands)

    van Weerdenburg, J.J.A.; van Uden, R.; Sillekens, E.; de Waardt, H.; Koonen, A.M.J.; Okonkwo, C.

    2016-01-01

    Performance monitoring based on centroid clustering to investigate constellation generation offsets. The tool allows flexibility in constellation generation tolerances by forwarding centroids to the demapper. The relation of fibre nonlinearities and singular value decomposition of intra-cluster

  3. THE FEATURES OF AIRCRAFT FUNCTIONAL SYSTEMS PERFORMANCE MONITORING

    Directory of Open Access Journals (Sweden)

    Stanislav Alexandrovich Krotov

    2017-01-01

    Full Text Available The key steps of aircraft essential parameters and events monitoring during its operation are considered in the arti- cle. Conditions for specific risk monitoring are also presented.The notion of fail-safe feature of aircraft functional systems is analysed, and the necessity of continuous process of safety flight level estimate is shown. The method of quantitative assessment of key events and risks probabilities with the use of modern software is proposed. This method contains 5 basic stages: The monitoring parameters setting - this stage is initial and begins with the consideration of organization safety cul- ture, the main purposes and problems determination, the basic parameters and characteristics forming which are to be monitored. The event monitoring in operation - on this stage continuous process of key events searching and monitoring which are a thing of importance within the framework of the established problems takes place. This process is closely relat- ed to parameters monitoring set on the first stage. The event and risk estimate - this stage begins directly after the event has been discovered. The estimate pro- cess is as long as it is required to identify the event gravity. It also contains the preliminary risk estimate for using in priori- tization of initial expanded estimate and in the working out of plan for activities realization. The working out of plan for activities - on this stage correction data is determined that will make changes to aero- technics working out, operation, maintenance and to staff training directly in linkage to the problem event identified earlier. The activity carrying-out - the realization of actions according to the activity plan. This stage concludes priori- tization, planning and problem carrying-out. The dependence set between the probability of failure situations and the degree of their danger is shown. The key factors which are subject to be estimated while aircraft operating and which aim with

  4. Link Performance Analysis and monitoring - A unified approach to divergent requirements

    Science.gov (United States)

    Thom, G. A.

    Link Performance Analysis and real-time monitoring are generally covered by a wide range of equipment. Bit Error Rate testers provide digital link performance measurements but are not useful during real-time data flows. Real-time performance monitors utilize the fixed overhead content but vary widely from format to format. Link quality information is also present from signal reconstruction equipment in the form of receiver AGC, bit synchronizer AGC, and bit synchronizer soft decision level outputs, but no general approach to utilizing this information exists. This paper presents an approach to link tests, real-time data quality monitoring, and results presentation that utilizes a set of general purpose modules in a flexible architectural environment. The system operates over a wide range of bit rates (up to 150 Mbs) and employs several measurement techniques, including P/N code errors or fixed PCM format errors, derived real-time BER from frame sync errors, and Data Quality Analysis derived by counting significant sync status changes. The architecture performs with a minimum of elements in place to permit a phased update of the user's unit in accordance with his needs.

  5. Monitoring driver fatigue using a single-channel electroencephalographic device: A validation study by gaze-based, driving performance, and subjective data.

    Science.gov (United States)

    Morales, José M; Díaz-Piedra, Carolina; Rieiro, Héctor; Roca-González, Joaquín; Romero, Samuel; Catena, Andrés; Fuentes, Luis J; Di Stasi, Leandro L

    2017-12-01

    Driver fatigue can impair performance as much as alcohol does. It is the most important road safety concern, causing thousands of accidents and fatalities every year. Thanks to technological developments, wearable, single-channel EEG devices are now getting considerable attention as fatigue monitors, as they could help drivers to assess their own levels of fatigue and, therefore, prevent the deterioration of performance. However, the few studies that have used single-channel EEG devices to investigate the physiological effects of driver fatigue have had inconsistent results, and the question of whether we can monitor driver fatigue reliably with these EEG devices remains open. Here, we assessed the validity of a single-channel EEG device (TGAM-based chip) to monitor changes in mental state (from alertness to fatigue). Fifteen drivers performed a 2-h simulated driving task while we recorded, simultaneously, their prefrontal brain activity and saccadic velocity. We used saccadic velocity as the reference index of fatigue. We also collected subjective ratings of alertness and fatigue, as well as driving performance. We found that the power spectra of the delta EEG band showed an inverted U-shaped quadratic trend (EEG power spectra increased for the first hour and half, and decreased during the last thirty minutes), while the power spectra of the beta band linearly increased as the driving session progressed. Coherently, saccadic velocity linearly decreased and speeding time increased, suggesting a clear effect of fatigue. Subjective data corroborated these conclusions. Overall, our results suggest that the TGAM-based chip EEG device is able to detect changes in mental state while performing a complex and dynamic everyday task as driving. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Technical Basis for Assessing Uranium Bioremediation Performance

    International Nuclear Information System (INIS)

    PE Long; SB Yabusaki; PD Meyer; CJ Murray; AL N'Guessan

    2008-01-01

    In situ bioremediation of uranium holds significant promise for effective stabilization of U(VI) from groundwater at reduced cost compared to conventional pump and treat. This promise is unlikely to be realized unless researchers and practitioners successfully predict and demonstrate the long-term effectiveness of uranium bioremediation protocols. Field research to date has focused on both proof of principle and a mechanistic level of understanding. Current practice typically involves an engineering approach using proprietary amendments that focuses mainly on monitoring U(VI) concentration for a limited time period. Given the complexity of uranium biogeochemistry and uranium secondary minerals, and the lack of documented case studies, a systematic monitoring approach using multiple performance indicators is needed. This document provides an overview of uranium bioremediation, summarizes design considerations, and identifies and prioritizes field performance indicators for the application of uranium bioremediation. The performance indicators provided as part of this document are based on current biogeochemical understanding of uranium and will enable practitioners to monitor the performance of their system and make a strong case to clients, regulators, and the public that the future performance of the system can be assured and changes in performance addressed as needed. The performance indicators established by this document and the information gained by using these indicators do add to the cost of uranium bioremediation. However, they are vital to the long-term success of the application of uranium bioremediation and provide a significant assurance that regulatory goals will be met. The document also emphasizes the need for systematic development of key information from bench scale tests and pilot scales tests prior to full-scale implementation

  7. Technical Basis for Assessing Uranium Bioremediation Performance

    Energy Technology Data Exchange (ETDEWEB)

    PE Long; SB Yabusaki; PD Meyer; CJ Murray; AL N’Guessan

    2008-04-01

    In situ bioremediation of uranium holds significant promise for effective stabilization of U(VI) from groundwater at reduced cost compared to conventional pump and treat. This promise is unlikely to be realized unless researchers and practitioners successfully predict and demonstrate the long-term effectiveness of uranium bioremediation protocols. Field research to date has focused on both proof of principle and a mechanistic level of understanding. Current practice typically involves an engineering approach using proprietary amendments that focuses mainly on monitoring U(VI) concentration for a limited time period. Given the complexity of uranium biogeochemistry and uranium secondary minerals, and the lack of documented case studies, a systematic monitoring approach using multiple performance indicators is needed. This document provides an overview of uranium bioremediation, summarizes design considerations, and identifies and prioritizes field performance indicators for the application of uranium bioremediation. The performance indicators provided as part of this document are based on current biogeochemical understanding of uranium and will enable practitioners to monitor the performance of their system and make a strong case to clients, regulators, and the public that the future performance of the system can be assured and changes in performance addressed as needed. The performance indicators established by this document and the information gained by using these indicators do add to the cost of uranium bioremediation. However, they are vital to the long-term success of the application of uranium bioremediation and provide a significant assurance that regulatory goals will be met. The document also emphasizes the need for systematic development of key information from bench scale tests and pilot scales tests prior to full-scale implementation.

  8. 32 CFR 34.41 - Monitoring and reporting program and financial performance.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Monitoring and reporting program and financial performance. 34.41 Section 34.41 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD... ORGANIZATIONS Post-award Requirements Reports and Records § 34.41 Monitoring and reporting program and financial...

  9. Near-Port Air Quality Assessment Utilizing a Mobile Monitoring Approach

    Data.gov (United States)

    U.S. Environmental Protection Agency — Near-Port Air Quality Assessment Utilizing a Mobile Monitoring Approach. This dataset is associated with the following publication: Steffens, J., S. Kimbrough, R....

  10. Stakeholder perspectives on workplace-based performance assessment: towards a better understanding of assessor behaviour.

    Science.gov (United States)

    de Jonge, Laury P J W M; Timmerman, Angelique A; Govaerts, Marjan J B; Muris, Jean W M; Muijtjens, Arno M M; Kramer, Anneke W M; van der Vleuten, Cees P M

    2017-12-01

    Workplace-Based Assessment (WBA) plays a pivotal role in present-day competency-based medical curricula. Validity in WBA mainly depends on how stakeholders (e.g. clinical supervisors and learners) use the assessments-rather than on the intrinsic qualities of instruments and methods. Current research on assessment in clinical contexts seems to imply that variable behaviours during performance assessment of both assessors and learners may well reflect their respective beliefs and perspectives towards WBA. We therefore performed a Q methodological study to explore perspectives underlying stakeholders' behaviours in WBA in a postgraduate medical training program. Five different perspectives on performance assessment were extracted: Agency, Mutuality, Objectivity, Adaptivity and Accountability. These perspectives reflect both differences and similarities in stakeholder perceptions and preferences regarding the utility of WBA. In comparing and contrasting the various perspectives, we identified two key areas of disagreement, specifically 'the locus of regulation of learning' (i.e., self-regulated versus externally regulated learning) and 'the extent to which assessment should be standardised' (i.e., tailored versus standardised assessment). Differing perspectives may variously affect stakeholders' acceptance, use-and, consequently, the effectiveness-of assessment programmes. Continuous interaction between all stakeholders is essential to monitor, adapt and improve assessment practices and to stimulate the development of a shared mental model. Better understanding of underlying stakeholder perspectives could be an important step in bridging the gap between psychometric and socio-constructivist approaches in WBA.

  11. Covert video monitoring in the assessment of medically unexplained symptoms in children.

    Science.gov (United States)

    Wallace, Dustin P; Sim, Leslie A; Harrison, Tracy E; Bruce, Barbara K; Harbeck-Weber, Cynthia

    2012-04-01

    Diagnosis of medically unexplained symptoms (MUS) occurs after thorough evaluations have failed to identify a physiological cause for symptoms. However, families and providers may wonder if something has been missed, leading to reduced confidence in behavioral treatment. Confidence may be improved through the use of technology such as covert video monitoring to better assess functioning across settings. A 12-year-old male presented with progressive neurological decline, precipitated by chronic pain. After thorough evaluation and the failure of standard treatments (medical, rehabilitative, and psychological) covert video monitoring revealed that the patient demonstrated greater abilities when alone in his room. Negative reinforcement was used to initiate recovery, accompanied by positive reinforcement and a rehabilitative approach. Covert video monitoring assisted in three subsequent cases over the following 3 years. In certain complex cases, video monitoring can inform the assessment and treatment of MUS. Discussion includes ethical and practical considerations.

  12. Development of high-performance monitoring system under severe accident condition

    International Nuclear Information System (INIS)

    Takeuchi, Tomoaki; Tsuchiya, Kunihiro; Ishihara, Masahiro; Komanome, H.; Miura, K.

    2017-01-01

    A research and development of a monitoring system for NPPs situations even during severe accidents have been performed. The R and D consists of the three objectives. The major findings are briefly summarized in the followings: 1) Radiation-resistant monitoring camera. The image sensor with the photogate and three transistors was found to be advantageous in terms of dark current and sensitivity. In addition, radiation-resistant optical parts and signal circuits were successfully fabricated. The results suggested that the monitoring camera system with 10 6 Gy in radiation resistance was possible. 2) Radiation-resistant in-water wireless transmission system. A two-dimensional LED matrix with 10 6 Gy in radiation resistance and a camera were used as the transmission devices. The results of the in-water transmission tests suggested that stable wireless transmission between 5 m distance was possible even with bubble, turbidity, or obstacles. 3) Heat-resistant signal cable. In order to develop a cable that can transmit the data inside reactor pressure vessels, heat-proof tests were performed for candidate metallic sheath materials of mineral insulation (MI) cables. The results indicated MI cables which can be used at 1000degC in air were possible. These results indicate the feasibility of the monitoring system even during severe accidents. (author)

  13. Designing Second Language Performance Assessments. Technical Report.

    Science.gov (United States)

    Norris, John M.; Brown, James Dean; Hudson, Thom; Yoshioka, Jim

    This technical report focuses on the decision-making potential provided by second language performance assessments. First, performance assessment is situated within the broader discussion of alternatives in language assessment and in educational assessment in general. Next, issues in performance assessment design, implementation, reliability, and…

  14. Patient-centered technological assessment and monitoring of depression for low-income patients.

    Science.gov (United States)

    Wu, Shinyi; Vidyanti, Irene; Liu, Pai; Hawkins, Caitlin; Ramirez, Magaly; Guterman, Jeffrey; Gross-Schulman, Sandra; Sklaroff, Laura Myerchin; Ell, Kathleen

    2014-01-01

    Depression is a significant challenge for ambulatory care because it worsens health status and outcomes, increases health care utilizations and costs, and elevates suicide risk. An automatic telephonic assessment (ATA) system that links with tasks and alerts to providers may improve quality of depression care and increase provider productivity. We used ATA system in a trial to assess and monitor depressive symptoms of 444 safety-net primary care patients with diabetes. We assessed system properties, evaluated preliminary clinical outcomes, and estimated cost savings. The ATA system is feasible, reliable, valid, safe, and likely cost-effective for depression screening and monitoring for low-income primary care population.

  15. Performance Assessment in Courts - The Swiss Case

    Directory of Open Access Journals (Sweden)

    Andreas Lienhard

    2014-12-01

    Full Text Available Abstract Performance assessments have become commonplace in management, even in the public sector. With the increasing pressure on courts to perform while making efficient use of resources, performance assessments in the justice system are also gaining in importance. However, the need for judicial independence poses special challenges for performance assessments in courts. Against this background, this article conducts a constitutional appraisal, and contrasts the need for judicial independence with the principles governing effectiveness and efficiency, self-government and supervision, and appointment and re-appointment. A duty to guarantee justice can be derived from this that does not in principle exclude the performance assessment of judges, but even renders it essential, subject to compliance with certain requirements. In these circumstances, it seems hardly surprising that numerous countries conduct performance assessments of judges and also that various international institutions have developed principles for this purpose, a summary of which is presented – in Switzerland’s case based on a recently conducted survey. In the field of conflict between the guaranteeing justice and protecting the judiciary, the following key questions arise in particular: What is the purpose of performance assessments and what are the consequences?What is subjected to a performance assessment and what are the assessment criteria?How is performance recorded as the basis for the performance assessment?Who is subjected to a performance assessment, and must a distinction be made between judges in higher and lower courts?Who carries out the performance assessment and what methods of protecting one’s rights are available?Who should receive the results of the performance assessment?The contribution sketches out possible answers to these key questions and aims to encourage academics and practitioners to give further consideration to this subject.

  16. New portable monitor enhances the ability to evaluate heat exchanger performance

    International Nuclear Information System (INIS)

    O'Toole, W.; Lacy, J.R.; Karlovich, D.N.

    1992-01-01

    Corrosion and fouling problems in nuclear power plant service water systems have led to industry-wide concern. These problems can affect the ability of these important heat exchangers to remove design heat loads. In addition, a limited amount of permanently installed on-line instrumentation is available to monitor key heat transfer parameters. A new, computerized monitoring system has been developed that acquires and manipulates process data. This enables power plant personnel to evaluate the on-line performance of important cooling system heat exchangers. The equipment provides the capability to continuously monitor, graph, and record cooling and process heat transfer parameters. The computer hardware is in a portable cabinet on wheels, which can be easily rolled from exchanger to exchanger for monitoring. This new monitoring system is being used at Consolidated Edison Company of New York Inc.'s Indian Point 2 Nuclear Station. They are currently expanding their performance testing on service water system heat exchangers and other auxiliary components to include those units that have limited on-line instrumentation. The ability to use clamp on flow and temperature sensing devices is necessary for trending exchanger performance. With on-line testing capabilities it is possible to: evaluate the cleanliness of plant heat transfer surfaces; make judgments about biofouling or antiscalant programs; and determine when equipment needs to be shut down for inspection or cleaning This paper describes this state-of-the-art equipment in detail and its application at the Indian Point 2 Nuclear Station. 9 refs., 8 figs., 1 tab

  17. Performance Assessment National Review Group

    International Nuclear Information System (INIS)

    Lieberman, J.A.; Davis, S.N.; Harleman, D.R.F.

    1985-02-01

    Performance assessment involves predicting the potential radiological impact of a nuclear waste disposal system, taking into account all of the natural and engineered components of the system. It includes the analysis and evaluation of predicted system and component performance to determine compliance with regulatory performance criteria. In the context of the nuclear waste management program, performance assessment has five major purposes: to assist in the evaluation and selection of repository sites; to guide the research, development, and testing programs; to assist in the evaluation of repository designs; to assist in the evaluation of the design and performance of engineered barriers; and to show regulatory compliance and support repository licensing. Current performance assessment methodologies are still in the developmental stage. Only the simplest of bounding calculations have produced quantitative predictions of radionuclide releases. The methodologies require considerable extension and validation before they can provide answers suitable for project decisions and licensing. 135 refs., 9 figs., 1 tab

  18. Context for performance assessment

    International Nuclear Information System (INIS)

    Kocher, D.C.

    1997-01-01

    In developing its recommendations on performance assessment for disposal of low-level radioactive waste, Scientific committee 87-3 of the National Council on Radiation Protection and Measurements (NCRP) has considered a number of topics that provide a context for the development of suitable approaches to performance assessment. This paper summarizes the Committee' discussions on these topics, including (1) the definition of low-level waste and its sources and properties, as they affect the variety of wastes that must be considered, (2) fundamental objectives and principles of radioactive waste disposal and their application to low-level waste, (3) current performance objectives for low-level waste disposal in the US, with particular emphasis on such unresolved issues of importance to performance assessment as the time frame for compliance, requirements for protection of groundwater and surface water, inclusion of doses from radon, demonstrating compliance with fixed performance objectives using highly uncertain model projections, and application of the principle that releases to the environment should be maintained as low as reasonably achievable (ALARA), (4) the role of active and passive institutional controls over disposal sites, (5) the role of the inadvertent human intruder in low-level waste disposal, (6) model validation and confidence in model outcomes, and (7) the concept of reasonable assurance of compliance

  19. Operational human performance reliability assessment (OHPRA)

    International Nuclear Information System (INIS)

    Haas, P.M.; Swanson, P.J.; Connelly, E.M.

    1993-01-01

    Operational Human Performance Reliability Assessment (OHPRA) is an approach for assessing human performance that is being developed in response to demands from modern process industries for practical and effective tools to assess and improve human performance, and therefore overall system performance and safety. The single most distinguishing feature of the approach is that is defines human performance in open-quotes operationalclose quotes terms. OHPRA is focused not on generation of human error probabilities, but on practical analysis of human performance to aid management in (1) identifying open-quotes fixableclose quotes problems and (2) providing input on the importance and nature of potential improvements. Development of the model in progress uses a unique approach for eliciting expert strategies for assessing performance. A PC-based model incorporating this expertise is planned. A preliminary version of the approach has already been used successfully to identify practical human performance problems in reactor and chemical process plant operations

  20. Performance Analysis of Retrofitted Tribo-Corrosion Test Rig for Monitoring In Situ Oil Conditions

    Directory of Open Access Journals (Sweden)

    Arpith Siddaiah

    2017-09-01

    Full Text Available Oils and lubricants, once extracted after use from a mechanical system, can hardly be reused, and should be refurbished or replaced in most applications. New methods of in situ oil and lubricant efficiency monitoring systems have been introduced for a wide variety of mechanical systems, such as automobiles, aerospace aircrafts, ships, offshore wind turbines, and deep sea oil drilling rigs. These methods utilize electronic sensors to monitor the “byproduct effects” in a mechanical system that are not indicative of the actual remaining lifecycle and reliability of the oils. A reliable oil monitoring system should be able to monitor the wear rate and the corrosion rate of the tribo-pairs due to the inclusion of contaminants. The current study addresses this technological gap, and presents a novel design of a tribo-corrosion test rig for oils used in a dynamic system. A pin-on-disk tribometer test rig retrofitted with a three electrode-potentiostat corrosion monitoring system was used to analyze the corrosion and wear rate of a steel tribo-pair in industrial grade transmission oil. The effectiveness of the retrofitted test rig was analyzed by introducing various concentrations of contaminants in an oil medium that usually leads to a corrosive working environment. The results indicate that the retrofitted test rig can effectively monitor the in situ tribological performance of the oil in a controlled dynamic corrosive environment. It is a useful method to understand the wear–corrosion synergies for further experimental work, and to develop accurate predictive lifecycle assessment and prognostic models. The application of this system is expected to have economic benefits and help reduce the ecological oil waste footprint.

  1. Performance Analysis of Retrofitted Tribo-Corrosion Test Rig for Monitoring In Situ Oil Conditions.

    Science.gov (United States)

    Siddaiah, Arpith; Khan, Zulfiqar Ahmad; Ramachandran, Rahul; Menezes, Pradeep L

    2017-09-28

    Oils and lubricants, once extracted after use from a mechanical system, can hardly be reused, and should be refurbished or replaced in most applications. New methods of in situ oil and lubricant efficiency monitoring systems have been introduced for a wide variety of mechanical systems, such as automobiles, aerospace aircrafts, ships, offshore wind turbines, and deep sea oil drilling rigs. These methods utilize electronic sensors to monitor the "byproduct effects" in a mechanical system that are not indicative of the actual remaining lifecycle and reliability of the oils. A reliable oil monitoring system should be able to monitor the wear rate and the corrosion rate of the tribo-pairs due to the inclusion of contaminants. The current study addresses this technological gap, and presents a novel design of a tribo-corrosion test rig for oils used in a dynamic system. A pin-on-disk tribometer test rig retrofitted with a three electrode-potentiostat corrosion monitoring system was used to analyze the corrosion and wear rate of a steel tribo-pair in industrial grade transmission oil. The effectiveness of the retrofitted test rig was analyzed by introducing various concentrations of contaminants in an oil medium that usually leads to a corrosive working environment. The results indicate that the retrofitted test rig can effectively monitor the in situ tribological performance of the oil in a controlled dynamic corrosive environment. It is a useful method to understand the wear-corrosion synergies for further experimental work, and to develop accurate predictive lifecycle assessment and prognostic models. The application of this system is expected to have economic benefits and help reduce the ecological oil waste footprint.

  2. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  3. Log quality enhancement: A systematic assessment of logging company wellsite performance and log quality

    International Nuclear Information System (INIS)

    Farnan, R.A.; Mc Hattie, C.M.

    1984-01-01

    To improve the monitoring of logging company performance, computer programs were developed to assess information en masse from log quality check lists completed on wellsite by the service company engineer and Phillips representative. A study of all logging jobs performed by different service companies for Phillips in Oklahoma (panhandle excepted) during 1982 enabled several pertinent and beneficial interpretations to be made. Company A provided the best tool and crew service. Company B incurred an excessive amount of lost time related to tool failure, in particular the neutron-density tool combination. Company C, although used only three times, incurred no lost time. With a reasonable data base valid conclusions were made pertaining, for example, to repeated tool malfunctions. The actual logs were then assessed for quality

  4. Wearable technologies for soldier first responder assessment and remote monitoring (Conference Presentation)

    Science.gov (United States)

    Lee, Stephen

    2017-05-01

    Embedded combat medical personnel require accurate and timely biometric data to ensure appropriate life saving measures. Injured warfighter's operating in remote environments require both assessment and monitoring often while still engaged with enemy forces. Small wearable devices that can be placed on injured personnel capable of collecting essential biometric data, including the capacity to remotely deliver collected data in real-time, would allow additional medical monitoring and triage that will greatly help the medic in the battlefield. These new capabilities will provide a force multiplier through remote assessment, increased survivability, and in freeing engaged warfighter's from direct monitoring thus improving combat effectiveness and increasing situational awareness. Key questions around what information does the medic require and how effective it can be relayed to support personnel are at their early stages of development. A low power biometric wearable device capable of reliable electrocardiogram (EKG) rhythm, temperature, pulse, and other vital data collection which can provide real-time remote monitoring are in development for the Soldier.

  5. Performance assessment in algebra learning process

    Science.gov (United States)

    Lestariani, Ida; Sujadi, Imam; Pramudya, Ikrar

    2017-12-01

    The purpose of research to describe the implementation of performance assessment on algebra learning process. The subject in this research is math educator of SMAN 1 Ngawi class X. This research includes descriptive qualitative research type. Techniques of data collecting are done by observation method, interview, and documentation. Data analysis technique is done by data reduction, data presentation, and conclusion. The results showed any indication that the steps taken by the educator in applying the performance assessment are 1) preparing individual worksheets and group worksheets, 2) preparing rubric assessments for independent worksheets and groups and 3) making performance assessments rubric to learners’ performance results with individual or groups task.

  6. Exposure monitoring and risk assessment of biphenyl in the workplace.

    Science.gov (United States)

    Kim, Hyeon-Yeong; Shin, Sae-Mi; Ham, Miran; Lim, Cheol-Hong; Byeon, Sang-Hoon

    2015-05-13

    This study was performed to assess exposure to and the risk caused by biphenyl in the workplace. Biphenyl is widely used as a heat transfer medium and as an emulsifier and polish in industry. Vapor or high levels of dust inhalation and dermal exposure to biphenyl can cause eye inflammation, irritation of respiratory organs, and permanent lesions in the liver and nervous system. In this study, the workplace environment concentrations were assessed as central tendency exposure and reasonable maximum exposure and were shown to be 0.03 and 0.12 mg/m³, respectively. In addition, the carcinogenic risk of biphenyl as determined by risk assessment was 0.14 × 10⁻⁴ (central tendency exposure) and 0.56 × 10⁻⁴ (reasonable maximum exposure), which is below the acceptable risk value of 1.0 × 10⁻⁴. Furthermore, the central tendency exposure and reasonable maximum exposure hazard quotients were 0.01 and 0.06 for oral toxicity, 0.05 and 0.23 for inhalation toxicity, and 0.08 and 0.39 for reproduction toxicity, respectively, which are all lower than the acceptable hazard quotient of 1.0. Therefore, exposure to biphenyl was found to be safe in current workplace environments. Because occupational exposure limits are based on socioeconomic assessment, they are generally higher than true values seen in toxicity experiments. Based on the results of exposure monitoring of biphenyl, the current occupational exposure limits in Korea could be reviewed.

  7. Exposure Monitoring and Risk Assessment of Biphenyl in the Workplace

    Directory of Open Access Journals (Sweden)

    Hyeon-Yeong Kim

    2015-05-01

    Full Text Available This study was performed to assess exposure to and the risk caused by biphenyl in the workplace. Biphenyl is widely used as a heat transfer medium and as an emulsifier and polish in industry. Vapor or high levels of dust inhalation and dermal exposure to biphenyl can cause eye inflammation, irritation of respiratory organs, and permanent lesions in the liver and nervous system. In this study, the workplace environment concentrations were assessed as central tendency exposure and reasonable maximum exposure and were shown to be 0.03 and 0.12 mg/m3, respectively. In addition, the carcinogenic risk of biphenyl as determined by risk assessment was 0.14 × 10−4 (central tendency exposure and 0.56 × 10−4 (reasonable maximum exposure, which is below the acceptable risk value of 1.0 × 10−4. Furthermore, the central tendency exposure and reasonable maximum exposure hazard quotients were 0.01 and 0.06 for oral toxicity, 0.05 and 0.23 for inhalation toxicity, and 0.08 and 0.39 for reproduction toxicity, respectively, which are all lower than the acceptable hazard quotient of 1.0. Therefore, exposure to biphenyl was found to be safe in current workplace environments. Because occupational exposure limits are based on socioeconomic assessment, they are generally higher than true values seen in toxicity experiments. Based on the results of exposure monitoring of biphenyl, the current occupational exposure limits in Korea could be reviewed.

  8. Performance Monitoring for Nuclear Safety Related Instrumentation at PUSPATI TRIGA Reactor (RTP)

    International Nuclear Information System (INIS)

    Zareen Khan Abdul Jalil Khan; Ridzuan Abdul Mutalib; Mohd Sabri Minhat

    2015-01-01

    The Reactor TRIGA PUSPATI (RTP) at Malaysia Nuclear Agency is a TRIGA Mark II type reactor and pool type cooled by natural circulation of light water. This paper describe on performance monitoring for nuclear safety related instrumentation in TRIGA PUSPATI Reactor (RTP) of based on various parameter of reactor safety instrument channel such as log power, linear power, Fuel temperature, coolant temperature will take into consideration. Methodology of performance on estimation and monitoring is to evaluate and analysis of reactor parameters which is important of reactor safety and control. And also to estimate power measurement, differential of log and linear power and fuel temperature during reactor start-up, operation and shutdown .This study also focus on neutron power fluctuation from fission chamber during reactor start-up and operation. This work will present result of performance monitoring from RTP which indicated the safety parameter identification and initiate safety action on crossing the threshold set point trip. Conclude that performance of nuclear safety related instrumentation will improved the reactor control and safety parameter during reactor start-up, operation and shutdown. (author)

  9. The Australian Medical Schools Assessment Collaboration: benchmarking the preclinical performance of medical students.

    Science.gov (United States)

    O'Mara, Deborah A; Canny, Ben J; Rothnie, Imogene P; Wilson, Ian G; Barnard, John; Davies, Llewelyn

    2015-02-02

    To report the level of participation of medical schools in the Australian Medical Schools Assessment Collaboration (AMSAC); and to measure differences in student performance related to medical school characteristics and implementation methods. Retrospective analysis of data using the Rasch statistical model to correct for missing data and variability in item difficulty. Linear model analysis of variance was used to assess differences in student performance. 6401 preclinical students from 13 medical schools that participated in AMSAC from 2011 to 2013. Rasch estimates of preclinical basic and clinical science knowledge. Representation of Australian medical schools and students in AMSAC more than doubled between 2009 and 2013. In 2013 it included 12 of 19 medical schools and 68% of medical students. Graduate-entry students scored higher than students entering straight from school. Students at large schools scored higher than students at small schools. Although the significance level was high (P performance. The effect on performance of multiple assessments compared with the test items as part of a single end-of-year examination was negligible. The variables investigated explain only 12% of the total variation in student performance. An increasing number of medical schools are participating in AMSAC to monitor student performance in preclinical sciences against an external benchmark. Medical school characteristics account for only a small part of overall variation in student performance. Student performance was not affected by the different methods of administering test items.

  10. 22 CFR 226.51 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 226.51 Section 226.51 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF... more frequently than quarterly or, less frequently than annually. Annual reports shall be due 90...

  11. Review of SR 97 performance assessment

    International Nuclear Information System (INIS)

    Glynn, P.D.

    2000-01-01

    This review has identified many technical problems in the SR 97 performance assessment. The general impression of this reviewer is that SKB has been disingenuous in its performance assessment effort. It has not cited important differences of opinion with its own views. Furthermore, there are many inconsistencies in the SR 97 report that all together leave the impression that there are many more uncertainties in the SR 97 performance assessment than SKB would perhaps care to admit. Additionally, despite SKB's statements to the contrary, many of the analyses conducted for the SR 97 performance assessment can be clearly shown not to have been based on 'conservative' assumptions. Finally, SKB has made little effort to consider possible coupling effects between their different scenarios in SR 97. This is a serious flaw in the SR 97 performance assessment. The comments in this review should not be taken to imply that the KBS-3 nuclear waste disposal method will not be able to meet the safety and radiation protection requirements which SKI and SSI have specified in recent years. Instead, my conclusion is simply that the SR 97 performance assessment of the KBS-3 method would have been more believable had it been based on a forthright and comprehensive discussion of facts, uncertainties and opinions, and on a more conservative choice of assumptions. As it stands, the SR 97 performance assessment is not very credible

  12. Complete Web Monitoring Watching Performance, Users, and Communities

    CERN Document Server

    Croll, Alistair

    2009-01-01

    Complete Web Monitoring demonstrates how to measure every aspect of your web presence -- including analytics, backend performance, usability, communities, customer feedback, and competitive analysis -- whether you're running an e-commerce site, a community, a media property, or a Software-as-a-Service company. This book's concrete examples, clear explanations, and practical recommendations make it essential for anyone who runs a website.

  13. Hematocrit correction does not improve glucose monitor accuracy in the assessment of neonatal hypoglycemia.

    Science.gov (United States)

    Wang, Li; Sievenpiper, John L; de Souza, Russell J; Thomaz, Michele; Blatz, Susan; Grey, Vijaylaxmi; Fusch, Christoph; Balion, Cynthia

    2013-08-01

    The lack of accuracy of point of care (POC) glucose monitors has limited their use in the diagnosis of neonatal hypoglycemia. Hematocrit plays an important role in explaining discordant results. The objective of this study was to to assess the effect of hematocrit on the diagnostic performance of Abbott Precision Xceed Pro (PXP) and Nova StatStrip (StatStrip) monitors in neonates. All blood samples ordered for laboratory glucose measurement were analyzed using the PXP and StatStrip and compared with the laboratory analyzer (ABL 800 Blood Gas analyzer [ABL]). Acceptable error targets were ±15% for glucose monitoring and ±5% for diagnosis. A total of 307 samples from 176 neonates were analyzed. Overall, 90% of StatStrip and 75% of PXP values met the 15% error limit and 45% of StatStrip and 32% of PXP values met the 5% error limit. At glucose concentrations ≤4 mmol/L, 83% of StatStrip and 79% of PXP values met the 15% error limit, while 37% of StatStrip and 38% of PXP values met the 5% error limit. Hematocrit explained 7.4% of the difference between the PXP and ABL whereas it accounted for only 0.09% of the difference between the StatStrip and ABL. The ROC analysis showed the screening cut point with the best performance for identifying neonatal hypoglycemia was 3.2 mmol/L for StatStrip and 3.3 mmol/L for PXP. Despite a negligible hematocrit effect for the StatStrip, it did not achieve recommended error limits. The StatStrip and PXP glucose monitors remain suitable only for neonatal hypoglycemia screening with confirmation required from a laboratory analyzer.

  14. Assessment of laboratory and daily energy expenditure estimates from consumer multi-sensor physical activity monitors.

    Science.gov (United States)

    Chowdhury, Enhad A; Western, Max J; Nightingale, Thomas E; Peacock, Oliver J; Thompson, Dylan

    2017-01-01

    Wearable physical activity monitors are growing in popularity and provide the opportunity for large numbers of the public to self-monitor physical activity behaviours. The latest generation of these devices feature multiple sensors, ostensibly similar or even superior to advanced research instruments. However, little is known about the accuracy of their energy expenditure estimates. Here, we assessed their performance against criterion measurements in both controlled laboratory conditions (simulated activities of daily living and structured exercise) and over a 24 hour period in free-living conditions. Thirty men (n = 15) and women (n = 15) wore three multi-sensor consumer monitors (Microsoft Band, Apple Watch and Fitbit Charge HR), an accelerometry-only device as a comparison (Jawbone UP24) and validated research-grade multi-sensor devices (BodyMedia Core and individually calibrated Actiheart™). During discrete laboratory activities when compared against indirect calorimetry, the Apple Watch performed similarly to criterion measures. The Fitbit Charge HR was less consistent at measurement of discrete activities, but produced similar free-living estimates to the Apple Watch. Both these devices underestimated free-living energy expenditure (-394 kcal/d and -405 kcal/d, respectively; P<0.01). The multi-sensor Microsoft Band and accelerometry-only Jawbone UP24 devices underestimated most laboratory activities and substantially underestimated free-living expenditure (-1128 kcal/d and -998 kcal/d, respectively; P<0.01). None of the consumer devices were deemed equivalent to the reference method for daily energy expenditure. For all devices, there was a tendency for negative bias with greater daily energy expenditure. No consumer monitors performed as well as the research-grade devices although in some (but not all) cases, estimates were close to criterion measurements. Thus, whilst industry-led innovation has improved the accuracy of consumer monitors, these devices

  15. Assessment of laboratory and daily energy expenditure estimates from consumer multi-sensor physical activity monitors.

    Directory of Open Access Journals (Sweden)

    Enhad A Chowdhury

    Full Text Available Wearable physical activity monitors are growing in popularity and provide the opportunity for large numbers of the public to self-monitor physical activity behaviours. The latest generation of these devices feature multiple sensors, ostensibly similar or even superior to advanced research instruments. However, little is known about the accuracy of their energy expenditure estimates. Here, we assessed their performance against criterion measurements in both controlled laboratory conditions (simulated activities of daily living and structured exercise and over a 24 hour period in free-living conditions. Thirty men (n = 15 and women (n = 15 wore three multi-sensor consumer monitors (Microsoft Band, Apple Watch and Fitbit Charge HR, an accelerometry-only device as a comparison (Jawbone UP24 and validated research-grade multi-sensor devices (BodyMedia Core and individually calibrated Actiheart™. During discrete laboratory activities when compared against indirect calorimetry, the Apple Watch performed similarly to criterion measures. The Fitbit Charge HR was less consistent at measurement of discrete activities, but produced similar free-living estimates to the Apple Watch. Both these devices underestimated free-living energy expenditure (-394 kcal/d and -405 kcal/d, respectively; P<0.01. The multi-sensor Microsoft Band and accelerometry-only Jawbone UP24 devices underestimated most laboratory activities and substantially underestimated free-living expenditure (-1128 kcal/d and -998 kcal/d, respectively; P<0.01. None of the consumer devices were deemed equivalent to the reference method for daily energy expenditure. For all devices, there was a tendency for negative bias with greater daily energy expenditure. No consumer monitors performed as well as the research-grade devices although in some (but not all cases, estimates were close to criterion measurements. Thus, whilst industry-led innovation has improved the accuracy of consumer monitors

  16. Federal Radiological Monitoring and Assessment Center Analytical Response

    International Nuclear Information System (INIS)

    Nielsen, E.C.

    2003-01-01

    The Federal Radiological Monitoring and Assessment Center (FR-MAC) is authorized by the Federal Radiological Emergency Response Plan to coordinate all off-site radiological response assistance to state and local government s, in the event of a major radiological emergency in the United States. The FR-MAC is established by the U.S. Department of Energy, National Nuclear Security Administration, to coordinate all Federal assets involved in conducting a comprehensive program of radiological environmental monitoring, sampling, radioanalysis, quality assurance, and dose assessment. During an emergency response, the initial analytical data is provided by portable field instrumentation. As incident responders scale up their response based on the seriousness of the incident, local analytical assets and mobile laboratories add additional capability and capacity. During the intermediate phase of the response, data quality objectives and measurement quality objectives are more rigorous. These higher objectives will require the use of larger laboratories, with greater capacity and enhanced capabilities. These labs may be geographically distant FR-om the incident, which will increase sample management challenges. This paper addresses emergency radioanalytical capability and capacity and its utilization during FR-MAC operations

  17. An Integrated Architecture for On-Board Aircraft Engine Performance Trend Monitoring and Gas Path Fault Diagnostics

    Science.gov (United States)

    Simon, Donald L.

    2010-01-01

    Aircraft engine performance trend monitoring and gas path fault diagnostics are closely related technologies that assist operators in managing the health of their gas turbine engine assets. Trend monitoring is the process of monitoring the gradual performance change that an aircraft engine will naturally incur over time due to turbomachinery deterioration, while gas path diagnostics is the process of detecting and isolating the occurrence of any faults impacting engine flow-path performance. Today, performance trend monitoring and gas path fault diagnostic functions are performed by a combination of on-board and off-board strategies. On-board engine control computers contain logic that monitors for anomalous engine operation in real-time. Off-board ground stations are used to conduct fleet-wide engine trend monitoring and fault diagnostics based on data collected from each engine each flight. Continuing advances in avionics are enabling the migration of portions of the ground-based functionality on-board, giving rise to more sophisticated on-board engine health management capabilities. This paper reviews the conventional engine performance trend monitoring and gas path fault diagnostic architecture commonly applied today, and presents a proposed enhanced on-board architecture for future applications. The enhanced architecture gains real-time access to an expanded quantity of engine parameters, and provides advanced on-board model-based estimation capabilities. The benefits of the enhanced architecture include the real-time continuous monitoring of engine health, the early diagnosis of fault conditions, and the estimation of unmeasured engine performance parameters. A future vision to advance the enhanced architecture is also presented and discussed

  18. Assessing and optimizing infra-sound networks to monitor volcanic eruptions

    International Nuclear Information System (INIS)

    Tailpied, Dorianne

    2016-01-01

    Understanding infra-sound signals is essential to monitor compliance with the Comprehensive Nuclear-Test ban Treaty, and also to demonstrate the potential of the global monitoring infra-sound network for civil and scientific applications. The main objective of this thesis is to develop a robust tool to estimate and optimize the performance of any infra-sound network to monitor explosive sources such as volcanic eruptions. Unlike previous studies, the developed method has the advantage to consider realistic atmospheric specifications along the propagation path, source frequency and noise levels at the stations. It allows to predict the attenuation and the minimum detectable source amplitude. By simulating the performances of any infra-sound networks, it is then possible to define the optimal configuration of the network to monitor a specific region, during a given period. When carefully adding a station to the existing network, performance can be improved by a factor of 2. However, it is not always possible to complete the network. A good knowledge of detection capabilities at large distances is thus essential. To provide a more realistic picture of the performance, we integrate the atmospheric longitudinal variability along the infra-sound propagation path in our simulations. This thesis also contributes in providing a confidence index taking into account the uncertainties related to propagation and atmospheric models. At high frequencies, the error can reach 40 dB. Volcanic eruptions are natural, powerful and valuable calibrating sources of infra-sound, worldwide detected. In this study, the well instrumented volcanoes Yasur, in Vanuatu, and Etna, in Italy, offer a unique opportunity to validate our attenuation model. In particular, accurate comparisons between near-field recordings and far-field detections of these volcanoes have helped to highlight the potential of our simulation tool to remotely monitor volcanoes. Such work could significantly help to prevent

  19. Evaluation of the RSG-GAS Alpha-Beta Aerosol Contaminant Monitor Performance Under Reactor Operation Condition

    International Nuclear Information System (INIS)

    Hartoyo, Unggul; Setiawanto, Anto; Sumarno, Yulius

    2000-01-01

    Analysis to evaluate the RSG-GAS alpha-beta aerosol contaminant monitor performance was done. The high potential radiation working area such as in RSG-GAS is important to monitored for personal safety. Further it is necessary to assure that the system monitor is reliable enough under normal conditions as well as emergency condition. The method uses in this analysis are monitoring and comparing with the standard source. The standard course indicator and panel in main control room indicate that the result is 1 x 110 exp 9 Ci/m exp 3. Based on data monitor observation, the RSG-GAS alpha-beta aerosol contaminant monitor system under reactor operation condition has a good enough performance

  20. Advanced Performance Modeling with Combined Passive and Active Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Dovrolis, Constantine [Georgia Inst. of Technology, Atlanta, GA (United States); Sim, Alex [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-04-15

    To improve the efficiency of resource utilization and scheduling of scientific data transfers on high-speed networks, the "Advanced Performance Modeling with combined passive and active monitoring" (APM) project investigates and models a general-purpose, reusable and expandable network performance estimation framework. The predictive estimation model and the framework will be helpful in optimizing the performance and utilization of networks as well as sharing resources with predictable performance for scientific collaborations, especially in data intensive applications. Our prediction model utilizes historical network performance information from various network activity logs as well as live streaming measurements from network peering devices. Historical network performance information is used without putting extra load on the resources by active measurement collection. Performance measurements collected by active probing is used judiciously for improving the accuracy of predictions.

  1. A simulation study to evaluate the performance of five statistical monitoring methods when applied to different time-series components in the context of control programs for endemic diseases

    DEFF Research Database (Denmark)

    Lopes Antunes, Ana Carolina; Jensen, Dan; Hisham Beshara Halasa, Tariq

    2017-01-01

    Disease monitoring and surveillance play a crucial role in control and eradication programs, as it is important to track implemented strategies in order to reduce and/or eliminate a specific disease. The objectives of this study were to assess the performance of different statistical monitoring......, decreases and constant sero-prevalence levels (referred as events). Two space-state models were used to model the time series, and different statistical monitoring methods (such as univariate process control algorithms–Shewart Control Chart, Tabular Cumulative Sums, and the V-mask- and monitoring...... of noise in the baseline was greater for the Shewhart Control Chart and Tabular Cumulative Sums than for the V-Mask and trend-based methods. The performance of the different statistical monitoring methods varied when monitoring increases and decreases in disease sero-prevalence. Combining two of more...

  2. A simulation study to evaluate the performance of five statistical monitoring methods when applied to different time-series components in the context of control programs for endemic diseases

    DEFF Research Database (Denmark)

    Lopes Antunes, Ana Carolina; Jensen, Dan; Hisham Beshara Halasa, Tariq

    2017-01-01

    , decreases and constant sero-prevalence levels (referred as events). Two space-state models were used to model the time series, and different statistical monitoring methods (such as univariate process control algorithms–Shewart Control Chart, Tabular Cumulative Sums, and the V-mask- and monitoring......Disease monitoring and surveillance play a crucial role in control and eradication programs, as it is important to track implemented strategies in order to reduce and/or eliminate a specific disease. The objectives of this study were to assess the performance of different statistical monitoring...... of noise in the baseline was greater for the Shewhart Control Chart and Tabular Cumulative Sums than for the V-Mask and trend-based methods. The performance of the different statistical monitoring methods varied when monitoring increases and decreases in disease sero-prevalence. Combining two of more...

  3. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    Ashwood, T.L.; Sample, B.E.; Suter, G.W. II; Turner, M.G.; Loar, J.M.; Barnthouse, L.W.

    1994-08-01

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  4. On line performance monitoring for predictive maintenance [Paper No.: VIA - 2

    International Nuclear Information System (INIS)

    Gupta, R.K.; Chandra, Rajesh

    1981-01-01

    There will always be progressive deterioration in the performance of dynamic equipment due to normal inevitable wear, malfunctions, failures and other reasons. In most cases it is possible to monitor some parameters of a system which would get progressively affected with the deterioration in the health of the system. By on-line monitoring of such predetermined parameters, compared with preset base data generated for a healthy system earlier, would prove very helpful in avoiding breakdowns and in proper planning of preventive and predictive maintenance. With increasing use of on-line computerised controls the generation of design base data and also the in-built self checking feature of monitoring the equipment health can be achieved by incorporating suitable software. This type of system will be helpful in: (a) predicting the life of component, (b) prewarning the operator about impending malfunctions, (c) establishing a maintenance schedule and spare inventory, and (d) analysing the failures. This type of centralised predictive maintenance is increasingly becoming important where: (a) the number of equipments are large, (b) the operation of equipment is critical from safety criteria, and (c) the minimum safety margin in the performance of the component is to be maintained. Keeping this in mind, the Fuel Handling System of Narora Atomic Power Project and the future power plants having computerised controls will have facility for on-line performance monitoring for predictive maintenance. The paper also describes methodology of the technique in detail, with a few representative cases. (author)

  5. Monitoring and Evaluating Government Performance in Botswana

    Directory of Open Access Journals (Sweden)

    E. K. Botlhale

    2015-03-01

    Full Text Available In an era characterised by fiscal stress in the post-global recession era, clichés such as ‘bang for the buck’ are commonplace. Governments are under increasing pressure to spend limited public resources in efficient and  effective ways. Efficient and  effective governments are a necessary, though not sufficient, condition for economic development. Hence, governments have adopted performance-improving interventions such as New Public Management. Botswana jumped into the bandwagon of public sector reforms in the 1990s through interventions such as Performance-based Management Systems. The focus was almost entirely on performance enhancement to the neglect of performance measurement through a result-based Monitoring and Evaluation (M&E framework. However, in 2009, the government decided to mainstream M&E into the development planning regime. Since the M&E tool is still in draft form, Botswana is very favourably circumstanced to learn from others. Meanwhile essentials to do are: attitudinal change, shared vision on M&E, stakeholder management and demand and use of M&E information by policy-makers such as Members of Parliament.

  6. A new watershed assessment framework for Nova Scotia: A high-level, integrated approach for regions without a dense network of monitoring stations

    Science.gov (United States)

    Sterling, Shannon M.; Garroway, Kevin; Guan, Yue; Ambrose, Sarah M.; Horne, Peter; Kennedy, Gavin W.

    2014-11-01

    High-level, integrated watershed assessments are a basic requirement for freshwater planning, as they create regional summaries of multiple environmental stressors for the prioritization of watershed conservation, restoration, monitoring, and mitigation. There is a heightened need for a high-level, integrated watershed assessment in Nova Scotia as it faces pressing watershed issues relating to acidification, soil erosion, acid rock drainage, eutrophication, and water withdrawals related to potential shale gas development. But because of the relative sparseness of the on-the-ground effects-based data, for example on water quality or fish assemblages, previously created approaches for integrated watershed assessment cannot be used. In a government/university collaboration, we developed a new approach that relies solely on easier-to-collect and more available exposure-based variables to perform the first high-level watershed assessment in Nova Scotia. In this assessment, a total of 295 watershed units were studied. We used Geographic Information Systems (GIS) to map and analyze 13 stressor variables that represent risks to aquatic environment (e.g., road/stream crossing density, acid rock drainage risk, surface water withdrawals, human land use, and dam density). We developed a model to link stressors with impacts to aquatic systems to serve as a basis for a watershed threat ranking system. Resource management activities performed by government and other stakeholders were also included in this analysis. Our assessment identifies the most threatened watersheds, enables informed comparisons among watersheds, and indicates where to focus resource management and monitoring efforts. Stakeholder communication tools produced by the NSWAP include a watershed atlas to communicate the assessment results to a broader audience, including policy makers and public stakeholders. This new framework for high-level watershed assessments provides a resource for other regions that also

  7. Oxide thickness measurement for monitoring fuel performance at high burnup

    International Nuclear Information System (INIS)

    Jaeger, M.A.; Van Swam, L.F.P.; Brueck-Neufeld, K.

    1991-01-01

    For on-site monitoring of the fuel performance at high burnup, Advanced Nuclear Fuels uses the linear scan eddy current method to determine the oxide thickness of irradiated Zircaloy fuel cans. Direct digital data acquisition methods are employed to collect the data on magnetic storage media. This field-proven methodology allows oxide thickness measurements and rapid interpretation of the data during the reactor outages and makes it possible to immediately reinsert the assemblies for the next operating cycle. The accuracy of the poolside measurements and data acquisition/interpretation techniques have been verified through hot cell metallographic measurements of rods previously measured in the fuel pool. The accumulated data provide a valuable database against which oxide growth models have been benchmarked and allow for effective monitoring of fuel performance. (orig.) [de

  8. The Impact of the Perceived Purpose of Electronic Performance Monitoring on an Array of Attitudinal Variables

    Science.gov (United States)

    Wells, Deborah L.; Moorman, Robert H.; Werner, Jon M.

    2007-01-01

    As a form of performance monitoring, electronic performance monitoring (EPM) offers the opportunity for unobtrusive and continuous performance data gathering. These strengths can also make EPM stressful and threatening. Many features of performance evaluation systems, including the organizational purposes for which they are used, can affect…

  9. Monitoring and performance analysis of AGR boilers during commissioning and power raising

    International Nuclear Information System (INIS)

    El-Nagdy, M.; Harrison, R.M.

    1984-01-01

    The installed boiler plant, for two 1300 MW AGR stations, is comprehensively instrumented for boiler control, performance assessment and component monitoring to ensure the integrity and safe operation of the plant during normal and faulty operating conditions. Plant instrumentation and computer systems installed at site for vibration analysis during the engineering runs and data acquisition during the power raising stage have been described. The results, from early rig investigations and the vibration testing during the unfueled engineering runs, indicate that the behaviour of the plant within the practical range of operating conditions is free from vibration problems. Also the analysis of the steady state thermal and hydrodynamic behaviour of the boiler plant during the power raising phase confirms the methods and computer models used for the boiler design. (author)

  10. Automatic and Objective Assessment of Alternating Tapping Performance in Parkinson’s Disease

    Directory of Open Access Journals (Sweden)

    Mevludin Memedi

    2013-12-01

    Full Text Available This paper presents the development and evaluation of a method for enabling quantitative and automatic scoring of alternating tapping performance of patients with Parkinson’s disease (PD. Ten healthy elderly subjects and 95 patients in different clinical stages of PD have utilized a touch-pad handheld computer to perform alternate tapping tests in their home environments. First, a neurologist used a web-based system to visually assess impairments in four tapping dimensions (‘speed’, ‘accuracy’, ‘fatigue’ and ‘arrhythmia’ and a global tapping severity (GTS. Second, tapping signals were processed with time series analysis and statistical methods to derive 24 quantitative parameters. Third, principal component analysis was used to reduce the dimensions of these parameters and to obtain scores for the four dimensions. Finally, a logistic regression classifier was trained using a 10-fold stratified cross-validation to map the reduced parameters to the corresponding visually assessed GTS scores. Results showed that the computed scores correlated well to visually assessed scores and were significantly different across Unified Parkinson’s Disease Rating Scale scores of upper limb motor performance. In addition, they had good internal consistency, had good ability to discriminate between healthy elderly and patients in different disease stages, had good sensitivity to treatment interventions and could reflect the natural disease progression over time. In conclusion, the automatic method can be useful to objectively assess the tapping performance of PD patients and can be included in telemedicine tools for remote monitoring of tapping.

  11. Survey of hydrogen monitoring devices

    International Nuclear Information System (INIS)

    Lai, W.

    1981-01-01

    Presented are results of a survey of commercially available monitoring devices suitable for hydrogen detection in the secondary containment vessel of a nuclear power plant during the post postulated accident period. Available detectors were grouped into the following five classes: combustion, solid state, electrochemical, thermal conductivity, and absorption. The performance of most available sensors is likely to deteriorate when exposed to the postulated conditions which include moisture, which could be at high temperature, and radioactive noncondensibles. Of the commercial devices, those using metallic filament thermal conductivity detectors seem least susceptible to performance change. Absorption detectors are best suited for this monitoring task but the only available device is designed for pipeline corrosion assessment. Initiation of experimental study to assess apparent deficiencies of commercial detectors is recommended. Also recommended is an analytical/experimental effort to determine the optimum detector array for monitoring in the secondary containment vessels

  12. Preclosure monitoring and performance confirmation at Yucca Mountain: Applicability of geophysical, geohydrological, and geochemical methods

    International Nuclear Information System (INIS)

    Tsang, C.F.

    1989-06-01

    The present paper presents considerations on studies that would be required for preclosure monitoring and performance confirmation of a nuclear waste geologic repository in an unsaturated zone. The critical parameters that should be monitored are reviewed and two scales of measurement relevant to monitoring activities, room scale and repository scale, are taken as a framework for investigation. A number of monitoring methods based on geophysics, geohydrology, and geochemistry are briefly summarized for their potential usefulness for preclosure monitoring and performance confirmation of the geologic repository. Particular emphasis is given to measurement of the spatial distribution of parameters in contrast to single-point measurements of quantities. 12 refs., 1 fig., 1 tab

  13. Assessing REDD+ performance of countries with low monitoring capacities: the matrix approach

    International Nuclear Information System (INIS)

    Bucki, M; Cuypers, D; Mayaux, P; Achard, F; Estreguil, C; Grassi, G

    2012-01-01

    Estimating emissions from deforestation and degradation of forests in many developing countries is so uncertain that the effects of changes in forest management could remain within error ranges (i.e. undetectable) for several years. Meanwhile UNFCCC Parties need consistent time series of meaningful performance indicators to set credible benchmarks and allocate REDD+ incentives to the countries, programs and activities that actually reduce emissions, while providing social and environmental benefits. Introducing widespread measuring of carbon in forest land (which would be required to estimate more accurately changes in emissions from degradation and forest management) will take time and considerable resources. To ensure the overall credibility and effectiveness of REDD+, parties must consider the design of cost-effective systems which can provide reliable and comparable data on anthropogenic forest emissions. Remote sensing can provide consistent time series of land cover maps for most non-Annex-I countries, retrospectively. These maps can be analyzed to identify the forests that are intact (i.e. beyond significant human influence), and whose fragmentation could be a proxy for degradation. This binary stratification of forests biomes (intact/non-intact), a transition matrix and the use of default carbon stock change factors can then be used to provide initial estimates of trends in emission changes. A proof-of-concept is provided for one biome of the Democratic Republic of the Congo over a virtual commitment period (2005–2010). This approach could allow assessment of the performance of the five REDD+ activities (deforestation, degradation, conservation, management and enhancement of forest carbon stocks) in a spatially explicit, verifiable manner. Incentives could then be tailored to prioritize activities depending on the national context and objectives. (letter)

  14. Assessing REDD+ performance of countries with low monitoring capacities: the matrix approach

    Science.gov (United States)

    Bucki, M.; Cuypers, D.; Mayaux, P.; Achard, F.; Estreguil, C.; Grassi, G.

    2012-03-01

    Estimating emissions from deforestation and degradation of forests in many developing countries is so uncertain that the effects of changes in forest management could remain within error ranges (i.e. undetectable) for several years. Meanwhile UNFCCC Parties need consistent time series of meaningful performance indicators to set credible benchmarks and allocate REDD+ incentives to the countries, programs and activities that actually reduce emissions, while providing social and environmental benefits. Introducing widespread measuring of carbon in forest land (which would be required to estimate more accurately changes in emissions from degradation and forest management) will take time and considerable resources. To ensure the overall credibility and effectiveness of REDD+, parties must consider the design of cost-effective systems which can provide reliable and comparable data on anthropogenic forest emissions. Remote sensing can provide consistent time series of land cover maps for most non-Annex-I countries, retrospectively. These maps can be analyzed to identify the forests that are intact (i.e. beyond significant human influence), and whose fragmentation could be a proxy for degradation. This binary stratification of forests biomes (intact/non-intact), a transition matrix and the use of default carbon stock change factors can then be used to provide initial estimates of trends in emission changes. A proof-of-concept is provided for one biome of the Democratic Republic of the Congo over a virtual commitment period (2005-2010). This approach could allow assessment of the performance of the five REDD+ activities (deforestation, degradation, conservation, management and enhancement of forest carbon stocks) in a spatially explicit, verifiable manner. Incentives could then be tailored to prioritize activities depending on the national context and objectives.

  15. Impact of different environmental conditions on lithium-ion batteries performance through the thermal monitoring with fiber sensors

    Science.gov (United States)

    Nascimento, Micael; Ferreira, Marta S.; Pinto, João. L.

    2017-08-01

    In this work, an optical fiber sensing network has been developed to assess the impact of different environmental conditions on lithium batteries performance through the real time thermal monitoring. The battery is submitted to constant current charge and different discharge C-rates, under normal and abusive operating conditions. The results show that for the discharge C-rate of 5.77C, the LiB under cold and dry climates had 32.5% and 27.2% lower temperature variations, when compared with temperate climates, respectively. The higher temperature shift detected in the temperate climate was related to the battery better performance regarding discharge capacity and power capabilities.

  16. Improving Multi-Sensor Drought Monitoring, Prediction and Recovery Assessment Using Gravimetry Information

    Science.gov (United States)

    Aghakouchak, Amir; Tourian, Mohammad J.

    2015-04-01

    Development of reliable drought monitoring, prediction and recovery assessment tools are fundamental to water resources management. This presentation focuses on how gravimetry information can improve drought assessment. First, we provide an overview of the Global Integrated Drought Monitoring and Prediction System (GIDMaPS) which offers near real-time drought information using remote sensing observations and model simulations. Then, we present a framework for integration of satellite gravimetry information for improving drought prediction and recovery assessment. The input data include satellite-based and model-based precipitation, soil moisture estimates and equivalent water height. Previous studies show that drought assessment based on one single indicator may not be sufficient. For this reason, GIDMaPS provides drought information based on multiple drought indicators including Standardized Precipitation Index (SPI), Standardized Soil Moisture Index (SSI) and the Multivariate Standardized Drought Index (MSDI) which combines SPI and SSI probabilistically. MSDI incorporates the meteorological and agricultural drought conditions and provides composite multi-index drought information for overall characterization of droughts. GIDMaPS includes a seasonal prediction component based on a statistical persistence-based approach. The prediction component of GIDMaPS provides the empirical probability of drought for different severity levels. In this presentation we present a new component in which the drought prediction information based on SPI, SSI and MSDI are conditioned on equivalent water height obtained from the Gravity Recovery and Climate Experiment (GRACE). Using a Bayesian approach, GRACE information is used to evaluate persistence of drought. Finally, the deficit equivalent water height based on GRACE is used for assessing drought recovery. In this presentation, both monitoring and prediction components of GIDMaPS will be discussed, and the results from 2014

  17. Pattern Matching for Volcano Status Assessment: what monitoring data alone can say about Mt. Etna activity

    Science.gov (United States)

    Cannavo, F.; Cannata, A.; Cassisi, C.

    2017-12-01

    The importance of assessing the ongoing status of active volcanoes is crucial not only for exposures to the local population but due to possible presence of tephra also for airline traffic. Adequately monitoring of active volcanoes, hence, plays a key role for civil protection purposes. In last decades, in order to properly monitor possible threats, continuous measuring networks have been designed and deployed on most of potentially hazardous volcanos. Nevertheless, at the present, volcano real-time surveillance is basically delegated to one or more human experts in volcanology, who interpret data coming from different kind of monitoring networks using their experience and non-measurable information (e.g. information from the field) to infer the volcano status. In some cases, raw data are used in some models to obtain more clues on the ongoing activity. In the last decades, with the development of volcano monitoring networks, huge amount of data of different geophysical, geochemical and volcanological types have been collected and stored in large databases. Having such big data sets with many examples of volcanic activity allows us to study volcano monitoring from a machine learning perspective. Thus, exploiting opportunities offered by the abundance of volcano monitoring time-series data we can try to address the following questions: Are the monitored parameters sufficient to discriminate the volcano status? Is it possible to infer/distinguish the volcano status only from the multivariate patterns of measurements? Are all the kind of measurements in the pattern equally useful for status assessment? How accurate would be an automatic system of status inference based only on pattern recognition of data? Here we present preliminary results of the data analysis we performed on a set of data and activity covering the period 2011-2017 at Mount Etna (Italy). In the considered period, we had 52 events of lava fountaining and long periods of Strombolian activity. We

  18. PERFORMANCE ASSESSMENT FOR FIELD SPORTS

    Directory of Open Access Journals (Sweden)

    Christopher Carling

    2009-03-01

    Full Text Available DESCRIPTION The book covers the various sport science assessment procedures for sports such as soccer, rugby, field hockey and lacrosse. It provides detailed and clear information about laboratory and field-based methods that can be used to assess and improve both individual and team performance. PURPOSE The book aims to provide a contemporary reference tool for selection of appropriate testing procedures for sports across a range of scientific disciplines. FEATURES The text begins with a chapter on the rationales for performance assessments, the use of technology and the necessity for procedures to conform to scientific rigor, explaining the importance of test criteria. This chapter ends by emphasizing the importance of the feedback process and vital considerations for the practitioner when interpreting the data, selecting which information is most important and how to deliver this back to the athlete or coach in order to deliver a positive performance outcome. The next two chapters focus on psychological assessments with respect to skill acquisition, retention and execution providing a variety of qualitative and quantitative options, underpinned with scientific theory and contextualized in order to improve the understanding of the application of these methods to improve anticipation and decision-making to enhance game intelligence.Chapter 4 provides coverage of match analysis techniques in order to make assessments of technical, tactical and physical performances. Readers learn about a series of methodologies ranging from simplistic pen and paper options through to sophisticated technological systems with some exemplar data also provided. Chapters 5 through 7 cover the physiological based assessments, including aerobic, anaerobic and anthropometric procedures. Each chapter delivers a theoretical opening section before progressing to various assessment options and the authors make great efforts to relate to sport-specific settings. The final

  19. A mobile cloud-based Parkinson's disease assessment system for home-based monitoring.

    Science.gov (United States)

    Pan, Di; Dhall, Rohit; Lieberman, Abraham; Petitti, Diana B

    2015-03-26

    Parkinson's disease (PD) is the most prevalent movement disorder of the central nervous system, and affects more than 6.3 million people in the world. The characteristic motor features include tremor, bradykinesia, rigidity, and impaired postural stability. Current therapy based on augmentation or replacement of dopamine is designed to improve patients' motor performance but often leads to levodopa-induced adverse effects, such as dyskinesia and motor fluctuation. Clinicians must regularly monitor patients in order to identify these effects and other declines in motor function as soon as possible. Current clinical assessment for Parkinson's is subjective and mostly conducted by brief observations made during patient visits. Changes in patients' motor function between visits are hard to track and clinicians are not able to make the most informed decisions about the course of therapy without frequent visits. Frequent clinic visits increase the physical and economic burden on patients and their families. In this project, we sought to design, develop, and evaluate a prototype mobile cloud-based mHealth app, "PD Dr", which collects quantitative and objective information about PD and would enable home-based assessment and monitoring of major PD symptoms. We designed and developed a mobile app on the Android platform to collect PD-related motion data using the smartphone 3D accelerometer and to send the data to a cloud service for storage, data processing, and PD symptoms severity estimation. To evaluate this system, data from the system were collected from 40 patients with PD and compared with experts' rating on standardized rating scales. The evaluation showed that PD Dr could effectively capture important motion features that differentiate PD severity and identify critical symptoms. For hand resting tremor detection, the sensitivity was .77 and accuracy was .82. For gait difficulty detection, the sensitivity was .89 and accuracy was .81. In PD severity estimation, the

  20. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  1. Auditory N1 reveals planning and monitoring processes during music performance.

    Science.gov (United States)

    Mathias, Brian; Gehring, William J; Palmer, Caroline

    2017-02-01

    The current study investigated the relationship between planning processes and feedback monitoring during music performance, a complex task in which performers prepare upcoming events while monitoring their sensory outcomes. Theories of action planning in auditory-motor production tasks propose that the planning of future events co-occurs with the perception of auditory feedback. This study investigated the neural correlates of planning and feedback monitoring by manipulating the contents of auditory feedback during music performance. Pianists memorized and performed melodies at a cued tempo in a synchronization-continuation task while the EEG was recorded. During performance, auditory feedback associated with single melody tones was occasionally substituted with tones corresponding to future (next), present (current), or past (previous) melody tones. Only future-oriented altered feedback disrupted behavior: Future-oriented feedback caused pianists to slow down on the subsequent tone more than past-oriented feedback, and amplitudes of the auditory N1 potential elicited by the tone immediately following the altered feedback were larger for future-oriented than for past-oriented or noncontextual (unrelated) altered feedback; larger N1 amplitudes were associated with greater slowing following altered feedback in the future condition only. Feedback-related negativities were elicited in all altered feedback conditions. In sum, behavioral and neural evidence suggests that future-oriented feedback disrupts performance more than past-oriented feedback, consistent with planning theories that posit similarity-based interference between feedback and planning contents. Neural sensory processing of auditory feedback, reflected in the N1 ERP, may serve as a marker for temporal disruption caused by altered auditory feedback in auditory-motor production tasks. © 2016 Society for Psychophysiological Research.

  2. Harmonizing electricity markets with physics : real time performance monitoring using grid-3PTM

    International Nuclear Information System (INIS)

    Budhraja, V.S.

    2003-01-01

    The Electric Power Group, LLC provides management and strategic consulting services for the electric power industry, with special emphasis on industry restructuring, competitive electricity markets, grid operations and reliability, power technologies, venture investments and start-ups. The Consortium for Electric Reliability Technology Solutions involves national laboratories, universities, and industry partners in researching, developing, and commercializing electric reliability technology solutions to protect and enhance the reliability of the American electric power system under the emerging competitive electricity market structure. Physics differentiate electric markets from other markets: there is real-time balancing, no storage, interconnected network, and power flows governed by physics. Some issues affecting both grid reliability and market issues are difficult to separate, such as security and congestion management, voltage management, reserves, frequency volatility, and others. The author examined the following investment challenges facing the electricity market: grid solutions, market solutions, and technology solutions. The real time performance monitoring and prediction platform, grid-3P was described and applications discussed, such as ACE-frequency monitoring, performance monitoring for automatic generation control (AGC) and frequency response, voltage/VAR monitoring, stability monitoring using phasor technology, and market monitoring. figs

  3. Performance assessment: a peer review

    International Nuclear Information System (INIS)

    Lieberman, J.A.; Lee, W.W.L.

    1986-01-01

    This paper describes the rationale, membership, operation and major observations of the Performance Assessment National Review Group. The Group was assembled by Weston at the request of the US Department of Energy Office of Civilian Radioactive Waste Management to review performance assessment work in the US basalt, salt and tuff repository projects. The purposes were to evaluate the adequacy of the current methods, identify deficiencies, and suggest potential improvement on repository performance assessment. To perform the review, Weston retained a group of distinguished consultants who have had extensive experience in disciplines pertinent to management of radioactive wastes including mathematical modeling of fluid transport. Topics reviewed included flow and transport, source term and uncertainty analysis. While the emphasis was on methodologies, the Projects were specifically requested to show currently available results so that the way they utilized familiar methodologies could be evaluated. This paper will highlight some of the technical observations of the Group as well as some managerial and institutional issues

  4. The performance of the CDF luminosity monitor

    CERN Document Server

    Acosta, D; Konigsberg, J; Korytov, A; Mitselmakher, G; Necula, V; Nomerotski, A; Pronko, A; Sukhanov, A; Safonov, A; Tsybychev, D; Wang, S M; Wong, M

    2002-01-01

    We describe the initial performance of the detector used for the luminosity measurement in the CDF experiment in Run II at the Tevatron. The detector consists of low-mass gaseous Cherenkov counters with high light yield (approx 100 photoelectrons) and monitors the process of inelastic pp-bar scattering. It allows for several methods of precise luminosity measurements at peak instantaneous luminosities of 2x10 sup 3 sup 2 cm sup - sup 2 s sup - sup 1 , corresponding to an average of six pp-bar interactions per bunch crossing.

  5. Design and implementation of an online risk monitor

    International Nuclear Information System (INIS)

    Majdara, A.; Nematollah, M. R.; Haddad, K.; Sepanloo, K.

    2006-01-01

    Probabilistic Safety Assessment is a powerful method for evaluating the safety of nuclear facilities. Probabilistic Safety Assessment models are the basis of online risk monitors, which can be utilized for monitoring the online risk. In this paper a newly developed risk monitor called Safety Assessment Tool is presented, and its main features and capabilities are introduced. Some of these features are: graphical event/fault tree developing interface, a 30-day risk profile, performing importance analysis, different administrative levels, and handling time dependent failure data. Safety Assessment Tool can be utilized in nuclear power plants, research reactors, etc. as an online assistant to manage safety issues and prevent high-risk configurations

  6. Making Performance Assessments a Part of Accountability

    Science.gov (United States)

    Haun, Billy

    2018-01-01

    The purpose of this commentary is to describe recent efforts in Virginia to develop and use performance assessments, including the challenges that emerged during this process and key considerations for states that integrate performance assessment into their systems. Performance assessments can play an important role in preparing students for…

  7. HwPMI: An Extensible Performance Monitoring Infrastructure for Improving Hardware Design and Productivity on FPGAs

    Directory of Open Access Journals (Sweden)

    Andrew G. Schmidt

    2012-01-01

    Full Text Available Designing hardware cores for FPGAs can quickly become a complicated task, difficult even for experienced engineers. With the addition of more sophisticated development tools and maturing high-level language-to-gates techniques, designs can be rapidly assembled; however, when the design is evaluated on the FPGA, the performance may not be what was expected. Therefore, an engineer may need to augment the design to include performance monitors to better understand the bottlenecks in the system or to aid in the debugging of the design. Unfortunately, identifying what to monitor and adding the infrastructure to retrieve the monitored data can be a challenging and time-consuming task. Our work alleviates this effort. We present the Hardware Performance Monitoring Infrastructure (HwPMI, which includes a collection of software tools and hardware cores that can be used to profile the current design, recommend and insert performance monitors directly into the HDL or netlist, and retrieve the monitored data with minimal invasiveness to the design. Three applications are used to demonstrate and evaluate HwPMI’s capabilities. The results are highly encouraging as the infrastructure adds numerous capabilities while requiring minimal effort by the designer and low resource overhead to the existing design.

  8. Technology and Innovation Management Indicators and Assessment Based on Government Performance

    Directory of Open Access Journals (Sweden)

    Sanja Marinković

    2016-05-01

    Full Text Available Throughout large global databases, such as OECD, UNDP, ITU, Eurostat, World Bank, and Statistical offices of countries, there are many indicators that refer to Technology and Innovation Management (TIM performance of countries. However, a question arises of how to classify and systematically analyze these indicators in terms of measuring, monitoring and enhancing TIM performance at a national level. More specifically, in this paper we pose a question of how to assess the government performance in TIM, as one aspect of the Triple Helix model. Therefore, we use a model of thirty-nine indicators which are classified according to three main management functions: planning, organizing and control, observed as input, process and output, respectively. More importantly, we analyze the relations that exist between these three categories of indicators. Planning indicators are observed as the investments in technological and innovative activities; organizing indicators include the infrastructure, public administration efficiency and cooperation support, while control indicators refer to the national economy R&D, transfer effects and entrepreneurship outcomes. The model is tested for assessing and comparing government performance in TIM for three countries: Serbia, Croatia and Slovenia, for the time period 2007-2012. Finally, as a feedback in the model, we used scores of the countries according to the Global Innovation Index and the Global Competitiveness Index, to verify the results and provide the final conclusion.

  9. Establishing an air pollution monitoring network for intra-urban population exposure assessment : a location-allocation approach

    Energy Technology Data Exchange (ETDEWEB)

    Kanaroglou, P.S. [McMaster Univ., Hamilton, ON (Canada). School of Geography and Geology; Jerrett, M.; Beckerman, B.; Arain, M.A. [McMaster Univ., Hamilton, ON (Canada). School of Geography and Geology]|[McMaster Univ., Hamilton, ON (Canada). McMaster Inst. of Environment and Health; Morrison, J. [Carleton Univ., Ottawa, ON (Canada). School of Computer Science; Gilbert, N.L. [Health Canada, Ottawa, ON (Canada). Air Health Effects Div; Brook, J.R. [Meteorological Service of Canada, Toronto, ON (Canada)

    2004-10-01

    A study was conducted to assess the relation between traffic-generated air pollution and health reactions ranging from childhood asthma to mortality from lung cancer. In particular, it developed a formal method of optimally locating a dense network of air pollution monitoring stations in order to derive an exposure assessment model based on the data obtained from the monitoring stations and related land use, population and biophysical information. The method for determining the locations of 100 nitrogen dioxide monitors in Toronto, Ontario focused on land use, transportation infrastructure and the distribution of at-risk populations. The exposure assessment produced reasonable estimates at the intra-urban scale. This method for locating air pollution monitors effectively maximizes sampling coverage in relation to important socio-demographic characteristics and likely pollution variability. The location-allocation approach integrates many variables into the demand surface to reconfigure a monitoring network and is especially useful for measuring traffic pollutants with fine-scale spatial variability. The method also shows great promise for improving the assessment of exposure to ambient air pollution in epidemiologic studies. 19 refs., 3 tabs., 4 figs.

  10. Federal Radiological Monitoring and Assessment Center. The analytical response

    International Nuclear Information System (INIS)

    Nielsen, E.C.

    2005-01-01

    The Federal Radiological Monitoring and Assessment Center (FRMAC) is authorized by the Federal Radiological Emergency Response Plan to coordinate all off-site radiological response assistance to state and local governments, in the event of a major radiological emergency in the United States. The FRMAC is established by the U.S. Department of Energy, National Nuclear Security Administration, to coordinate all Federal assets involved in conducting a comprehensive program of radiological environmental monitoring, sampling, radioanalysis, quality assurance, and dose assessment. During an emergency response, the initial analytical data is provided by portable field instrumentation. As incident responders scale up their response based on the seriousness of the incident, local analytical assets and mobile laboratories add additional capability and capacity. During the intermediate phase of the response, data quality objectives and measurement quality objectives are more rigorous. These higher objectives will require the use of larger laboratories, with greater capacity and enhanced capabilities. These labs may be geographically distant from the incident, which will increase sample management challenges. Emergency radioanalytical capability and capacity and its utilization during FRMAC operations are discussed. (author)

  11. Performance Assessment of Mergers and Acquisitions

    DEFF Research Database (Denmark)

    Wang, Daojuan; Moini, Hamid

    2012-01-01

    on the performance measures and benchmarks adopted in M&A research field and the relevant empirical results. We find that the definitions of performance varied in terms of accounting, financial, operational and perceptual metrics. And performance assessment is sensitive to the definition of performance, methodology......Corporate mergers and acquisitions (M&As) have been increasing popular during these decades. However, a majority of research show failure rate (40% - 80%) has not significantly changed. This “success paradox” triggers us to reflect on performance assessment of M&As: how the performance of M...

  12. 10^{7}-A load-current B-dot monitor: Simulations, design, and performance

    Directory of Open Access Journals (Sweden)

    D. V. Rose

    2010-04-01

    Full Text Available A B-dot monitor that measures the current 6 cm from the axis of dynamic loads fielded on 10^{7}-A multiterawatt pulsed-power accelerators has been developed. The monitor improves upon the multimegampere load-current gauge described in Phys. Rev. ST Accel. Beams 11, 100401 (2008PRABFM1098-440210.1103/PhysRevSTAB.11.100401. The design of the improved monitor was developed using three-dimensional particle-in-cell simulations that model vacuum electron flow in the transmission line near the monitor. The simulations include important geometric features of the B-dot probe and model the deposition of electron energy within the probe. The simulations show that the improved design reduces by as much as a factor of 5 the electron energy deposition to the interior of the monitor. Data taken on accelerator shots demonstrate that the improved monitor works as well as the original monitor on shots with low-impedance loads, and delivers superior performance on higher-impedance-load shots.

  13. A review of performance standards to monitor, evaluate and assess the impact of technology transfer offices

    Directory of Open Access Journals (Sweden)

    Sibongile Gumbi

    2010-07-01

    Full Text Available The conversion of scientific discoveries to new products and processes and their launch onto the market can be a lengthy process. Similarly, it takes many years before the impact of scientific research on society and the economy is realised and a further length of time before its performance can be measured. Higher education and research institutions, and their governments, often make significant investments into intellectual property management and technology transfer activities through legislative and policy development, human resource development, financial allocation and infrastructure improvement. Since returns on such investments are not immediately apparent, it is important to establish a means by which the impact of their efforts can be determined. In this paper, I examined the measures and indicators that could be developed by institutions and their stakeholders in order to monitor, evaluate and determine the impact of research output and outcomes on the market.

  14. Altitude control performance improvement via preview controller for unmanned airplane for radiation monitoring system

    International Nuclear Information System (INIS)

    Sato, Masayuki; Muraoka, Koji; Hozumi, Koki; Sanada, Yukihisa; Yamada, Tsutomu; Torii, Tatsuo

    2017-01-01

    This paper is concerned with the design problem of preview altitude controller for Unmanned Airplane for Radiation Monitoring System (UARMS) to improve its control performance. UARMS has been developed for radiation monitoring around Fukushima Dai-ichi nuclear power plant which spread radiation contaminant due to the huge tsunamis caused by the Great East Japan Earthquake. The monitoring area contains flat as well as mountain areas. The basic flight controller has been confirmed to have satisfactory performance with respect to altitude holding; however, the control performance for variable altitude commands is not sufficient for practical use in mountain areas. We therefore design preview altitude controller with only proportional gains by considering the practicality and the strong requirement of safety for UARMS. Control performance of the designed preview controller was evaluated by flight tests conducted around Fukushima Sky Park. (author)

  15. Exploring the use of internal and externalcontrols for assessing microarray technical performance

    Directory of Open Access Journals (Sweden)

    Game Laurence

    2010-12-01

    Full Text Available Abstract Background The maturing of gene expression microarray technology and interest in the use of microarray-based applications for clinical and diagnostic applications calls for quantitative measures of quality. This manuscript presents a retrospective study characterizing several approaches to assess technical performance of microarray data measured on the Affymetrix GeneChip platform, including whole-array metrics and information from a standard mixture of external spike-in and endogenous internal controls. Spike-in controls were found to carry the same information about technical performance as whole-array metrics and endogenous "housekeeping" genes. These results support the use of spike-in controls as general tools for performance assessment across time, experimenters and array batches, suggesting that they have potential for comparison of microarray data generated across species using different technologies. Results A layered PCA modeling methodology that uses data from a number of classes of controls (spike-in hybridization, spike-in polyA+, internal RNA degradation, endogenous or "housekeeping genes" was used for the assessment of microarray data quality. The controls provide information on multiple stages of the experimental protocol (e.g., hybridization, RNA amplification. External spike-in, hybridization and RNA labeling controls provide information related to both assay and hybridization performance whereas internal endogenous controls provide quality information on the biological sample. We find that the variance of the data generated from the external and internal controls carries critical information about technical performance; the PCA dissection of this variance is consistent with whole-array quality assessment based on a number of quality assurance/quality control (QA/QC metrics. Conclusions These results provide support for the use of both external and internal RNA control data to assess the technical quality of microarray

  16. 291-B-1 stack monitoring and sampling system annual system assessment report

    International Nuclear Information System (INIS)

    Ridge, T.M.

    1994-01-01

    The B Plant 291-B-1 main stack exhausts gaseous effluents to the atmosphere from the 221-B Building canyon and cells, the No. 1 Vessel Ventilation System (VVS1), the 212-B Cask Station cell ventilation system, and, to a limited capacity, the 224-B Building. VVS1 collects offgases from various process tanks in 221-B Building, while the 224-B system maintains a negative pressure in out-of-service, sealed process tanks. B Plant Administration Manual, WHC-CM-7-5, Section 5.30 requires an annual system assessment to evaluate and report the present condition of the sampling and monitoring system associated with Stack 291-B-1 (System Number B977A) at B Plant. The system is functional and performing satisfactorily

  17. Power performance assessment. Final report

    International Nuclear Information System (INIS)

    Frandsen, S.

    1998-12-01

    In the increasingly commercialised wind power marketplace, the lack of precise assessment methods for the output of an investment is becoming a barrier for wider penetration of wind power. Thus, addressing this problem, the overall objectives of the project are to reduce the financial risk in investment in wind power projects by significantly improving the power performance assessment methods. Ultimately, if this objective is successfully met, the project may also result in improved tuning of the individual wind turbines and in optimisation methods for wind farm operation. The immediate, measurable objectives of the project are: To prepare a review of existing contractual aspects of power performance verification procedures of wind farms; to provide information on production sensitivity to specific terrain characteristics and wind turbine parameters by analyses of a larger number of wind farm power performance data available to the proposers; to improve the understanding of the physical parameters connected to power performance in complex environment by comparing real-life wind farm power performance data with 3D computational flow models and 3D-turbulence wind turbine models; to develop the statistical framework including uncertainty analysis for power performance assessment in complex environments; and to propose one or more procedures for power performance evaluation of wind power plants in complex environments to be applied in contractual agreements between purchasers and manufacturers on production warranties. Although the focus in this project is on power performance assessment the possible results will also be of benefit to energy yield forecasting, since the two tasks are strongly related. (au) JOULE III. 66 refs.; In Co-operation Renewable Energy System Ltd. (GB); Centre for Renewable Energy (GR); Aeronautic Research Centre (SE); National Engineering Lab. (GB); Public Power Cooperation (GR)

  18. 40 CFR 52.430 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.430 Section 52.430 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Natural Resources & Environmental Control submitted a plan for the establishment and implementation of a...

  19. 40 CFR 52.480 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... of Columbia's Department of Consumer and Regulatory Affairs submitted a plan for the establishment... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.480 Section 52.480 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  20. Repository performance confirmation

    International Nuclear Information System (INIS)

    Hansen, Francis D.

    2011-01-01

    Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

  1. Conceptual framework for performance assessment: competency, competence and performance in the context of assessments in healthcare--deciphering the terminology.

    Science.gov (United States)

    Khan, Kamran; Ramachandran, Sankaranarayanan

    2012-01-01

    The definitions of performance, competence and competency are not very clear in the literature. The assessment of performance and the selection of tools for this purpose depend upon a deep understanding of each of the above terms and the factors influencing performance. In this article, we distinguish between competence and competency and explain the relationship of competence and performance in the light of the Dreyfus model of skills acquisition. We briefly critique the application of the principles described by Miller to the modern assessment tools and distinguish between assessment of actual performance in workplace settings and the observed performance, demonstrated by the candidates in the workplace or simulated settings. We describe a modification of the Dreyfus model applicable to assessments in healthcare and propose a new model for the assessment of performance and performance rating scale (PRS) based on this model. We propose that the use of adapted versions of this PRS will result in benchmarking of performance and allowing the candidates to track their progression of skills in various areas of clinical practice.

  2. Competency Assessment Using Key Performance Indicators

    OpenAIRE

    Elena Alexandra Toader; Laura Brad

    2015-01-01

    The paper proposes a method for computing the scores of the key performance indicators resulted in the competency assessment process. The key performance indicators are estimated considering four performance levels that an IT professional can obtain at the end of the assessment process. We suggest as the best approach for estimating the performance key indicators an online questionnaire filled by 60 employees that work in IT Romanian companies. The results provide evidence that the difference...

  3. The use of bio-monitoring to assess exposure in the electroplating industry.

    Science.gov (United States)

    Beattie, Helen; Keen, Chris; Coldwell, Matthew; Tan, Emma; Morton, Jackie; McAlinden, John; Smith, Paul

    2017-01-01

    Workers in the electroplating industry are potentially exposed to a range of hazardous substances including nickel and hexavalent chromium (chromium VI) compounds. These can cause serious health effects, including cancer, asthma and dermatitis. This research aimed to investigate whether repeat biological monitoring (BM) over time could drive sustainable improvements in exposure control in the industry. BM was performed on multiple occasions over 3 years, at 53 electroplating companies in Great Britain. Surface and dermal contamination was also measured, and controls were assessed. Air monitoring was undertaken on repeat visits where previous BM results were of concern. There were significant reductions in urinary nickel and chromium levels over the lifetime of this work in the subset of companies where initially, control deficiencies were more significant. Increased risk awareness following provision of direct feedback to individual workers and targeted advice to companies is likely to have contributed to these reductions. This study has shown that exposures to chromium VI and nickel in the electroplating industry occur via a combination of inhalation, dermal and ingestion routes. Surface contamination found in areas such as canteens highlights the potential for transferral from work areas, and the importance of a regular cleaning regime.

  4. Assessing reader performance in radiology, an imperfect science: Lessons from breast screening

    Energy Technology Data Exchange (ETDEWEB)

    Soh, B.P., E-mail: bsoh6456@uni.sydney.edu.au [Medical Image Optimisation and Perception Group (MIOPeG), Faculty of Health Sciences, University of Sydney, Lidcombe, NSW (Australia); Lee, W.; Kench, P.L.; Reed, W.M.; McEntee, M.F.; Poulos, A.; Brennan, P.C. [Medical Image Optimisation and Perception Group (MIOPeG), Faculty of Health Sciences, University of Sydney, Lidcombe, NSW (Australia)

    2012-07-15

    The purpose of this article is to review the limitations associated with current methods of assessing reader accuracy in mammography screening programmes. Clinical audit is commonly used as a quality-assurance tool to monitor the performance of screen readers; however, a number of the metrics employed, such as recall rate as a surrogate for specificity, do not always accurately measure the intended clinical feature. Alternatively, standardized screening test sets, which benefit from ease of application, immediacy of results, and quicker assessment of quality improvement plans, suffer from experimental confounders, thus questioning the relevance of these laboratory-type screening test sets to clinical performance. Four key factors that impact on the external validity of screening test sets were identified: the nature and extent of scrutiny of one's action, the artificiality of the environment, the over-simplification of responses, and prevalence of abnormality. The impact of these factors on radiological and other contexts is discussed, and although it is important to acknowledge the benefit of standardized screening test sets, issues relating to the relevance of test sets to clinical activities remain. The degree of correlation between performance based on real-life clinical audit and performances at screen read test sets must be better understood and specific causal agents for any lack of correlation identified.

  5. Energy performance assessment of virtualization technologies using small environmental monitoring sensors.

    Science.gov (United States)

    Liu, Lu; Masfary, Osama; Antonopoulos, Nick

    2012-01-01

    The increasing trends of electrical consumption within data centres are a growing concern for business owners as they are quickly becoming a large fraction of the total cost of ownership. Ultra small sensors could be deployed within a data centre to monitor environmental factors to lower the electrical costs and improve the energy efficiency. Since servers and air conditioners represent the top users of electrical power in the data centre, this research sets out to explore methods from each subsystem of the data centre as part of an overall energy efficient solution. In this paper, we investigate the current trends of Green IT awareness and how the deployment of small environmental sensors and Site Infrastructure equipment optimization techniques which can offer a solution to a global issue by reducing carbon emissions.

  6. A compact CCD-monitored atomic force microscope with optical vision and improved performances.

    Science.gov (United States)

    Mingyue, Liu; Haijun, Zhang; Dongxian, Zhang

    2013-09-01

    A novel CCD-monitored atomic force microscope (AFM) with optical vision and improved performances has been developed. Compact optical paths are specifically devised for both tip-sample microscopic monitoring and cantilever's deflection detecting with minimized volume and optimal light-amplifying ratio. The ingeniously designed AFM probe with such optical paths enables quick and safe tip-sample approaching, convenient and effective tip-sample positioning, and high quality image scanning. An image stitching method is also developed to build a wider-range AFM image under monitoring. Experiments show that this AFM system can offer real-time optical vision for tip-sample monitoring with wide visual field and/or high lateral optical resolution by simply switching the objective; meanwhile, it has the elegant performances of nanometer resolution, high stability, and high scan speed. Furthermore, it is capable of conducting wider-range image measurement while keeping nanometer resolution. Copyright © 2013 Wiley Periodicals, Inc.

  7. Performance Test of Core Protection and Monitoring Algorithm with DLL for SMART Simulator Implementation

    International Nuclear Information System (INIS)

    Koo, Bonseung; Hwang, Daehyun; Kim, Keungkoo

    2014-01-01

    A multi-purpose best-estimate simulator for SMART is being established, which is intended to be used as a tool to evaluate the impacts of design changes on the safety performance, and to improve and/or optimize the operating procedure of SMART. In keeping with these intentions, a real-time model of the digital core protection and monitoring systems was developed and the real-time performance of the models was verified for various simulation scenarios. In this paper, a performance test of the core protection and monitoring algorithm with a DLL file for the SMART simulator implementation was performed. A DLL file of the simulator application code was made and several real-time evaluation tests were conducted for the steady-state and transient conditions with simulated system variables. A performance test of the core protection and monitoring algorithms for the SMART simulator was performed. A DLL file of the simulator version code was made and several real-time evaluation tests were conducted for various scenarios with a DLL file and simulated system variables. The results of all test cases showed good agreement with the reference results and some features caused by algorithm change were properly reflected to the DLL results. Therefore, it was concluded that the SCOPS S SIM and SCOMS S SIM algorithms and calculational capabilities are appropriate for the core protection and monitoring program in the SMART simulator

  8. Assessing Scientific Performance.

    Science.gov (United States)

    Weiner, John M.; And Others

    1984-01-01

    A method for assessing scientific performance based on relationships displayed numerically in published documents is proposed and illustrated using published documents in pediatric oncology for the period 1979-1982. Contributions of a major clinical investigations group, the Childrens Cancer Study Group, are analyzed. Twenty-nine references are…

  9. Assessment of Current Inservice Inspection and Leak Monitoring Practices for Detecting Materials Degradation in Light Water Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Michael T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Simonen, Fredric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Muscara, Joseph [US Nuclear Regulatory Commission (NRC), Rockville, MD (United States); Doctor, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kupperman, David S. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-09-01

    An assessment was performed to determine the effectiveness of existing inservice inspection (ISI) and leak monitoring techniques, and recommend improvements, as necessary, to the programs as currently performed for light water reactor (LWR) components. Information from nuclear power plant (NPP) aging studies and from the U. S. Nuclear Regulatory Commission’s Generic Aging Lessons Learned (GALL) report (NUREG-1801) was used to identify components that have already experienced, or are expected to experience, degradation. This report provides a discussion of the key aspects and parameters that constitute an effective ISI program and a discussion of the basis and background against which the effectiveness of the ISI and leak monitoring programs for timely detection of degradation was evaluated. Tables based on the GALL components were used to systematically guide the process, and table columns were included that contained the ISI requirements and effectiveness assessment. The information in the tables was analyzed using histograms to reduce the data and help identify any trends. The analysis shows that the overall effectiveness of the ISI programs is very similar for both boiling water reactors (BWRs) and pressurized water reactors (PWRs). The evaluations conducted as part of this research showed that many ISI programs are not effective at detecting degradation before its extent reached 75% of the component wall thickness. This work should be considered as an assessment of NDE practices at this time; however, industry and regulatory activities are currently underway that will impact future effectiveness assessments. A number of actions have been identified to improve the current ISI programs so that degradation can be more reliably detected.

  10. New Monitoring Technology to Objectively Assess Adherence to Prescribed Footwear and Assistive Devices During Ambulatory Activity

    NARCIS (Netherlands)

    Bus, Sicco A.; Waaijman, Roelof; Nollet, Frans

    2012-01-01

    Bus SA, Waaijman R, Nollet F. New monitoring technology to objectively assess adherence to prescribed footwear and assistive devices during ambulatory activity. Arch Phys Med Rehabil 2012;93:2075-9. Objective: To assess the validity and feasibility of a new temperature-based adherence monitor to

  11. Input data requirements for performance modelling and monitoring of photovoltaic plants

    DEFF Research Database (Denmark)

    Gavriluta, Anamaria Florina; Spataru, Sergiu; Sera, Dezso

    2018-01-01

    This work investigates the input data requirements in the context of performance modeling of thin-film photovoltaic (PV) systems. The analysis focuses on the PVWatts performance model, well suited for on-line performance monitoring of PV strings, due to its low number of parameters and high......, modelling the performance of the PV modules at high irradiances requires a dataset of only a few hundred samples in order to obtain a power estimation accuracy of ~1-2\\%....

  12. Hemodynamic monitoring in the critically ill.

    Science.gov (United States)

    Voga, G

    1995-06-01

    Monitoring of vital functions is one of the most important and essential tools in the management of critically ill patients in the ICU. Today it is possible to detect and analyze a great variety of physiological signals by various noninvasive and invasive techniques. An intensivist should be able to select and perform the most appropriate monitoring method for the individual patient considering risk-benefit ratio of the particular monitoring technique and the need for immediate therapy, specific diagnosis, continuous monitoring and evaluation of morphology should be included. Despite rapid development of noninvasive monitoring techniques, invasive hemodynamic monitoring in still one of the most basic ICU procedures. It enables monitoring of pressures, flow and saturation, pressures in the systemic and pulmonary circulation, estimation of cardiac performance and judgment of the adequacy of the cardiocirculatory system. Carefully and correctly obtained information are basis for proper hemodynamic assessment which usually effects the therapeutic decisions.

  13. A Decentralized Wireless Solution to Monitor and Diagnose PV Solar Module Performance Based on Symmetrized-Shifted Gompertz Functions

    Science.gov (United States)

    Molina-García, Angel; Campelo, José Carlos; Blanc, Sara; Serrano, Juan José; García-Sánchez, Tania; Bueso, María C.

    2015-01-01

    This paper proposes and assesses an integrated solution to monitor and diagnose photovoltaic (PV) solar modules based on a decentralized wireless sensor acquisition system. Both DC electrical variables and environmental data are collected at PV module level using low-cost and high-energy efficiency node sensors. Data is real-time processed locally and compared with expected PV module performances obtained by a PV module model based on symmetrized-shifted Gompertz functions (as previously developed and assessed by the authors). Sensor nodes send data to a centralized sink-computing module using a multi-hop wireless sensor network architecture. Such integration thus provides extensive analysis of PV installations, and avoids off-line tests or post-processing processes. In comparison with previous approaches, this solution is enhanced with a low-cost system and non-critical performance constraints, and it is suitable for extensive deployment in PV power plants. Moreover, it is easily implemented in existing PV installations, since no additional wiring is required. The system has been implemented and assessed in a Spanish PV power plant connected to the grid. Results and estimations of PV module performances are also included in the paper. PMID:26230694

  14. A Decentralized Wireless Solution to Monitor and Diagnose PV Solar Module Performance Based on Symmetrized-Shifted Gompertz Functions

    Directory of Open Access Journals (Sweden)

    Angel Molina-García

    2015-07-01

    Full Text Available This paper proposes and assesses an integrated solution to monitor and diagnose photovoltaic (PV solar modules based on a decentralized wireless sensor acquisition system. Both DC electrical variables and environmental data are collected at PV module level using low-cost and high-energy efficiency node sensors. Data is real-time processed locally and compared with expected PV module performances obtained by a PV module model based on symmetrized-shifted Gompertz functions (as previously developed and assessed by the authors. Sensor nodes send data to a centralized sink-computing module using a multi-hop wireless sensor network architecture. Such integration thus provides extensive analysis of PV installations, and avoids off-line tests or post-processing processes. In comparison with previous approaches, this solution is enhanced with a low-cost system and non-critical performance constraints, and it is suitable for extensive deployment in PV power plants. Moreover, it is easily implemented in existing PV installations, since no additional wiring is required. The system has been implemented and assessed in a Spanish PV power plant connected to the grid. Results and estimations of PV module performances are also included in the paper.

  15. A Decentralized Wireless Solution to Monitor and Diagnose PV Solar Module Performance Based on Symmetrized-Shifted Gompertz Functions.

    Science.gov (United States)

    Molina-García, Angel; Campelo, José Carlos; Blanc, Sara; Serrano, Juan José; García-Sánchez, Tania; Bueso, María C

    2015-07-29

    This paper proposes and assesses an integrated solution to monitor and diagnose photovoltaic (PV) solar modules based on a decentralized wireless sensor acquisition system. Both DC electrical variables and environmental data are collected at PV module level using low-cost and high-energy efficiency node sensors. Data is real-time processed locally and compared with expected PV module performances obtained by a PV module model based on symmetrized-shifted Gompertz functions (as previously developed and assessed by the authors). Sensor nodes send data to a centralized sink-computing module using a multi-hop wireless sensor network architecture. Such integration thus provides extensive analysis of PV installations, and avoids off-line tests or post-processing processes. In comparison with previous approaches, this solution is enhanced with a low-cost system and non-critical performance constraints, and it is suitable for extensive deployment in PV power plants. Moreover, it is easily implemented in existing PV installations, since no additional wiring is required. The system has been implemented and assessed in a Spanish PV power plant connected to the grid. Results and estimations of PV module performances are also included in the paper.

  16. Measuring hospital-acquired pressure injuries: A surveillance programme for monitoring performance improvement and estimating annual prevalence.

    Science.gov (United States)

    Jull, Andrew; McCall, Elaine; Chappell, Matt; Tobin, Sam

    2016-06-01

    To describe a surveillance approach for monitoring the effect of improvement initiatives on hospital-acquired pressure injuries and findings arising from that surveillance. Random sampling of patients on the same day of each successive month from a campus of child and adult hospitals using a standard audit tool to identify presence of hospital-acquired pressure injury. Where multiple pressure injuries were present, the most severe grade injury contributed to prevalence. Statistical process control charts were used to monitor monthly performance and Maximum Likelihood Estimation to determine timing of step change. 8274 patients were assessed over 3 years from an eligible population of 32,259 hospitalised patients. 517 patients had hospital-acquired pressure injuries giving an overall prevalence of 6.2% (95% CI 5.7-6.8%). Annual prevalence was 8.4% (95% CI 7.4-9.5%) in the first year, falling to 5.6% (95% CI 4.7-6.4%) in the second year and 4.8% (95% CI 4.0-5.6%) in the third year. A step change was signalled with mean prevalence up to July 2013 being 7.9% (95% CI 7.1-8.8%) and mean prevalence thereafter 4.8% (95% CI 4.2-5.4%). Hospital-acquired pressure injuries were found in all age ranges, but were more frequent in children up to 14 years (17.4%) and those aged 75 years or older (38.7%). Monthly random sampling of patients within clinical units can be used to monitor performance improvement. This approach represents a rational alternative to cross-sectional prevalence surveys especially if the focus is on performance improvement. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Performance of zeolite scavenge column in Xe monitoring system

    International Nuclear Information System (INIS)

    Wang Qian; Wang Hongxia; Li Wei; Bian Zhishang

    2010-01-01

    In order to improve the performance of zeolite scavenge column, its ability of removal of humidity and carbon dioxide was studied by both static and dynamic approaches. The experimental results show that various factors, including the column length and diameter, the mass of zeolite, the content of water in air, the temperature rise during adsorption, and the activation effectiveness all effect the performance of zeolite column in scavenging humanity and carbon dioxide. Based on these results and previous experience, an optimized design of the zeolite column is made for use in xenon monitoring system. (authors)

  18. Evaluation of the performance of diagnosis monitors in use in Salvador city: pilot study

    International Nuclear Information System (INIS)

    Garcia, Igor; Geambastiani, Paulo; Ferreira, Mario; Macedo, Eric; Navarro, Marcus; Navarro, Valeria; Pereira, Lara; Jesus, Evandro de; Leite, Handerson Jorge Dourado

    2016-01-01

    Radiologically, the image quality is the accuracy of the representation of the patient's anatomy. Considering the importance of the performance of the monitors to the overall effectiveness of a practice of diagnostic imaging, the objective of this study is to evaluate the performance of diagnostic monitors in use, using the method described in the report 03 of the AAPA and Spanish protocol, using calibrated instrumentation traceable to NIST and to RBC. The results of the monitors evaluated to date show 100% compliance for geometric distortion tests and internal reflection and 0% compliance to the dependence of luminance test. (author)

  19. Online application of a risk management system for risk assessment and monitoring at NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Wang, Wenlin, E-mail: wlwang0618@126.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Li, Fengjun, E-mail: leefengjun@163.com [China Nuclear Power Engineering Co. Ltd (China)

    2016-08-15

    Highlights: • A generic GO-FLOW modeling structure is proposed for easily Living PSA development and analysis. • Hierarchical and modularized scheme is applied in the development of Living PSA models and database. • A risk management system is developed by GO-FLOW method. • Functional testing is conducted on the risk management system for performance evaluation. • The fast solution time derived from Living PSA application is supportive in plant safety management. - Abstract: The paper presents a risk management system on the basis of Living PSA models which are developed under a proposed generic GO-FLOW modeling method with a hierarchical and modular structure. The design of the risk management system is aiming at assisting plant personnel to manage maintenance plan and system configuration, and conduct system reliability monitoring, risk monitoring and risk management quickly and conveniently through graphical user interfaces without going deep into the details of building, updating and analyzing reliability and risk models. The performance of the proposed risk management system was tested on a full-scale simulator of PWR nuclear power plant and demonstrated that the fast solution time derived from utilization of hierarchical and modularized Living PSA models is strongly supportive for instantaneous risk assessment as well as for daily risk management at NPPs.

  20. Final Report for the ZERT Project: Basic Science of Retention Issues, Risk Assessment & Measurement, Monitoring and Verification for Geologic Sequestration

    Energy Technology Data Exchange (ETDEWEB)

    Spangler, Lee; Cunningham, Alfred; Lageson, David; Melick, Jesse; Gardner, Mike; Dobeck, Laura; Repasky, Kevin; Shaw, Joseph; Bajura, Richard; McGrail, B Peter; Oldenburg, Curtis M; Wagoner, Jeff; Pawar, Rajesh

    2011-03-31

    ZERT has made major contributions to five main areas of sequestration science: improvement of computational tools; measurement and monitoring techniques to verify storage and track migration of CO{sub 2}; development of a comprehensive performance and risk assessment framework; fundamental geophysical, geochemical and hydrological investigations of CO{sub 2} storage; and investigate innovative, bio-based mitigation strategies.

  1. BARC-risk monitor- a tool for operational safety assessment in nuclear power plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Hadap, Nikhil

    2000-12-01

    Probabilistic safety assessment has become a key tool as on today to identify and understand nuclear power plant vulnerabilities. As a result of the availability of these PSA studies, there is a desire to use them to enhance plant safety and to operate the nuclear stations in the most efficient manner. Risk monitor is a PC based tool, which computes the real time safety level and assists plant personnel to manage day-to-day activities. Risk monitor is a PC based user friendly software tool used for modification and re-analysis of a nuclear power plant. Operation of risk monitor is based on PSA methods for assisting in day to day applications. Risk monitoring programs can assess the risk profile and are used to optimise the operation of nuclear power plants with respect to a minimum risk level over the operating time. This report presents the background activities of risk monitor, its application areas and also gives the status of such tools in international scenarios. The software is based on the PSA model of Kaiga generating station and would be applicable to similar design configuration. (author)

  2. Assessing the value of information for long-term structural health monitoring

    Science.gov (United States)

    Pozzi, Matteo; Der Kiureghian, Armen

    2011-04-01

    In the field of Structural Health Monitoring, tests and sensing systems are intended as tools providing diagnoses, which allow the operator of the facility to develop an efficient maintenance plan or to require extraordinary measures on a structure. The effectiveness of these systems depends directly on their capability to guide towards the most optimal decision for the prevailing circumstances, avoiding mistakes and wastes of resources. Though this is well known, most studies only address the accuracy of the information gained from sensors without discussing economic criteria. Other studies evaluate these criteria separately, with only marginal or heuristic connection with the outcomes of the monitoring system. The concept of "Value of Information" (VoI) provides a rational basis to rank measuring systems according to a utility-based metric, which fully includes the decision-making process affected by the monitoring campaign. This framework allows, for example, an explicit assessment of the economical justifiability of adopting a sensor depending on its precision. In this paper we outline the framework for assessing the VoI, as applicable to the ranking of competitive measuring systems. We present the basic concepts involved, highlight issues related to monitoring of civil structures, address the problem of non-linearity of the cost-to-utility mapping, and introduce an approximate Monte Carlo approach suitable for the implementation of time-consuming predictive models.

  3. Dietary assessment and self-monitoring with nutrition applications for mobile devices.

    Science.gov (United States)

    Lieffers, Jessica R L; Hanning, Rhona M

    2012-01-01

    Nutrition applications for mobile devices (e.g., personal digital assistants, smartphones) are becoming increasingly accessible and can assist with the difficult task of intake recording for dietary assessment and self-monitoring. This review is a compilation and discussion of research on this tool for dietary intake documentation in healthy populations and those trying to lose weight. The purpose is to compare this tool with conventional methods (e.g., 24-hour recall interviews, paper-based food records). Research databases were searched from January 2000 to April 2011, with the following criteria: healthy or weight loss populations, use of a mobile device nutrition application, and inclusion of at least one of three measures, which were the ability to capture dietary intake in comparison with conventional methods, dietary self-monitoring adherence, and changes in anthropometrics and/or dietary intake. Eighteen studies are discussed. Two application categories were identified: those with which users select food and portion size from databases and those with which users photograph their food. Overall, positive feedback was reported with applications. Both application types had moderate to good correlations for assessing energy and nutrient intakes in comparison with conventional methods. For self-monitoring, applications versus conventional techniques (often paper records) frequently resulted in better self-monitoring adherence, and changes in dietary intake and/or anthropometrics. Nutrition applications for mobile devices have an exciting potential for use in dietetic practice.

  4. Development of VIPER: a simulator for assessing vision performance of warfighters

    Science.gov (United States)

    Familoni, Jide; Thompson, Roger; Moyer, Steve; Mueller, Gregory; Williams, Tim; Nguyen, Hung-Quang; Espinola, Richard L.; Sia, Rose K.; Ryan, Denise S.; Rivers, Bruce A.

    2016-05-01

    Background: When evaluating vision, it is important to assess not just the ability to read letters on a vision chart, but also how well one sees in real life scenarios. As part of the Warfighter Refractive Eye Surgery Program (WRESP), visual outcomes are assessed before and after refractive surgery. A Warfighter's ability to read signs and detect and identify objects is crucial, not only when deployed in a military setting, but also in their civilian lives. Objective: VIPER, a VIsion PERformance simulator was envisioned as actual video-based simulated driving to test warfighters' functional vision under realistic conditions. Designed to use interactive video image controlled environments at daytime, dusk, night, and with thermal imaging vision, it simulates the experience of viewing and identifying road signs and other objects while driving. We hypothesize that VIPER will facilitate efficient and quantifiable assessment of changes in vision and measurement of functional military performance. Study Design: Video images were recorded on an isolated 1.1 mile stretch of road with separate target sets of six simulated road signs and six objects of military interest, separately. The video footage were integrated with customdesigned C++ based software that presented the simulated drive to an observer on a computer monitor at 10, 20 or 30 miles/hour. VIPER permits the observer to indicate when a target is seen and when it is identified. Distances at which the observer recognizes and identifies targets are automatically logged. Errors in recognition and identification are also recorded. This first report describes VIPER's development and a preliminary study to establish a baseline for its performance. In the study, nine soldiers viewed simulations at 10 miles/hour and 30 miles/hour, run in randomized order for each participant seated at 36 inches from the monitor. Relevance: Ultimately, patients are interested in how their vision will affect their ability to perform daily

  5. How Do States Integrate Performance Assessment in Their Systems of Assessment?

    Science.gov (United States)

    Stosich, Elizabeth Leisy; Snyder, Jon; Wilczak, Katie

    2018-01-01

    This paper reviews state strategies for incorporating performance assessment in policy and practice. Specifically, the paper reviews the use of performance assessment in 12 states in the Innovation Lab Network, a group committed to developing systems of assessment that provide meaningful measures of college and career readiness. This review…

  6. Hybrid monitoring scheme for end-to-end performance enhancement of multicast-based real-time media

    Science.gov (United States)

    Park, Ju-Won; Kim, JongWon

    2004-10-01

    As real-time media applications based on IP multicast networks spread widely, end-to-end QoS (quality of service) provisioning for these applications have become very important. To guarantee the end-to-end QoS of multi-party media applications, it is essential to monitor the time-varying status of both network metrics (i.e., delay, jitter and loss) and system metrics (i.e., CPU and memory utilization). In this paper, targeting the multicast-enabled AG (Access Grid) a next-generation group collaboration tool based on multi-party media services, the applicability of hybrid monitoring scheme that combines active and passive monitoring is investigated. The active monitoring measures network-layer metrics (i.e., network condition) with probe packets while the passive monitoring checks both application-layer metrics (i.e., user traffic condition by analyzing RTCP packets) and system metrics. By comparing these hybrid results, we attempt to pinpoint the causes of performance degradation and explore corresponding reactions to improve the end-to-end performance. The experimental results show that the proposed hybrid monitoring can provide useful information to coordinate the performance improvement of multi-party real-time media applications.

  7. 40 CFR 52.2035 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Science.gov (United States)

    2010-07-01

    ... Stations (PAMS) Program. 52.2035 Section 52.2035 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) Pennsylvania § 52.2035 Photochemical Assessment Monitoring Stations (PAMS) Program. On September 23, 1994... (PAMS) Program as a state implementation plan (SIP) revision, as required by section 182(c)(1) of the...

  8. Interactions of Team Mental Models and Monitoring Behaviors Predict Team Performance in Simulated Anesthesia Inductions

    Science.gov (United States)

    Burtscher, Michael J.; Kolbe, Michaela; Wacker, Johannes; Manser, Tanja

    2011-01-01

    In the present study, we investigated how two team mental model properties (similarity vs. accuracy) and two forms of monitoring behavior (team vs. systems) interacted to predict team performance in anesthesia. In particular, we were interested in whether the relationship between monitoring behavior and team performance was moderated by team…

  9. Effects of mindfulness-based cognitive therapy on neurophysiological correlates of performance monitoring in adult attention-deficit/hyperactivity disorder.

    Science.gov (United States)

    Schoenberg, Poppy L A; Hepark, Sevket; Kan, Cornelis C; Barendregt, Henk P; Buitelaar, Jan K; Speckens, Anne E M

    2014-07-01

    To examine whether mindfulness-based cognitive therapy (MBCT) would enhance attenuated amplitudes of event-related potentials (ERPs) indexing performance monitoring biomarkers of attention-deficit/hyperactivity disorder (ADHD). Fifty adult ADHD patients took part in a randomised controlled study investigating ERP and clinical measures pre-to-post MBCT. Twenty-six patients were randomly allocated to MBCT, 24 to a wait-list control. Main outcome measures included error processing (ERN, Pe), conflict monitoring (NoGo-N2), and inhibitory control (NoGo-P3) ERPs concomitant to a continuous performance task (CPT-X). Inattention and hyperactivity-impulsivity ADHD symptoms, psychological distress and social functioning, and mindfulness skills were also assessed. MBCT was associated with increased Pe and NoGo-P3 amplitudes, coinciding with reduced 'hyperactivity/impulsivity' and 'inattention' symptomatology. Specific to the MBCT; enhanced Pe amplitudes correlated with a decrease in hyperactivity/impulsivity symptoms and increased 'act-with-awareness' mindfulness skill, whereas, enhanced P3 correlated with amelioration in inattention symptoms. MBCT enhanced ERP amplitudes associated with motivational saliency and error awareness, leading to improved inhibitory regulation. MBCT suggests having comparable modulation on performance monitoring ERP amplitudes as pharmacological treatments. Further study and development of MBCT as a treatment for ADHD is warranted, in addition to its potential scope for clinical applicability to broader defined externalising disorders and clinical problems associated with impairments of the prefrontal cortex. Copyright © 2013 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.

  10. Monitoring student attendance, participation, and performance improvement: an instrument and forms.

    Science.gov (United States)

    Kosta, Joanne

    2012-01-01

    When students receive consistent and fair feedback about their behavior, program liability decreases. To help students to have a clearer understanding of minimum program standards and the consequences of substandard performance, the author developed attendance and participation monitoring and performance improvement instruments. The author discusses the tools that address absenteeism, tardiness, unprofessional, and unsafe clinical behaviors among students.

  11. Daily-life tele-monitoring of motor performance in stroke survivors

    NARCIS (Netherlands)

    Veltink, Petrus H.; van Meulen, Fokke; van Beijnum, Bernhard J.F.; Klaassen, Bart; Hermens, Hermanus J.; Droog, Adriaan; Weusthof, Marcel H.H.; Lorussi, F.; Tognetti, A.; Reenalda, J.; Reenalda, Jasper; Nikamp, C.D.M.; Nikamp-Simons, Corien Diana Maria; Baten, Christian T.M.; Buurke, Jaap; Held, J.; Luft, A.; Luinge, H.; De Toma, G.; Mancuso, C.; Paradiso, R.; Aminian, Kamiar

    2014-01-01

    The objective of the EU project INTERACTION is to develop an unobtrusive and modular sensing system for objective monitoring of daily-life motor performance of stroke survivors. This will enable clinical professionals to advise their patients about their continued daily-life activity profile and

  12. On the use of wearable physiological monitors to assess heat strain during occupational heat stress.

    Science.gov (United States)

    Notley, Sean R; Flouris, Andreas D; Kenny, Glen P

    2018-05-04

    Workers in many industries are required to perform arduous work in high heat stress conditions, which can lead to rapid increases in body temperature that elevate the risk of heat-related illness or even death. Traditionally, effort to mitigate work-related heat injury has been directed to the assessment of environmental heat stress (e.g., wet-bulb globe temperature), rather than the associated physiological strain responses (e.g., heart rate, skin and core temperatures). However, since a workers physiological response to a given heat stress is modified independently by inter-individual factors (e.g., age, sex, chronic disease, others) and intra-individual factors both within (e.g., medication use, fitness, acclimation and hydration state, others) and beyond a workers control (e.g., shift duration, illness, others), it becomes challenging to protect workers on an individual basis from heat-related injury without assessing those physiological responses. Recent advancements in wearable technology have made it possible to monitor one or more physiological indices of heat strain. Nonetheless, information on the utility of the wearable systems available for assessing occupational heat strain is unavailable. This communication is therefore directed at identifying the physiological indices of heat strain that may be quantified in the workplace and evaluating the wearable monitoring systems available for assessing those responses. Finally, emphasis is directed to the barriers associated with implementing these devices to assist in mitigating work-related heat injury. This information is fundamental for protecting worker health and could also be utilized to prevent heat illnesses in vulnerable people during leisure or athletic activities in the heat.

  13. The effect of monitor raster latency on VEPs, ERPs and Brain-Computer Interface performance.

    Science.gov (United States)

    Nagel, Sebastian; Dreher, Werner; Rosenstiel, Wolfgang; Spüler, Martin

    2018-02-01

    Visual neuroscience experiments and Brain-Computer Interface (BCI) control often require strict timings in a millisecond scale. As most experiments are performed using a personal computer (PC), the latencies that are introduced by the setup should be taken into account and be corrected. As a standard computer monitor uses a rastering to update each line of the image sequentially, this causes a monitor raster latency which depends on the position, on the monitor and the refresh rate. We technically measured the raster latencies of different monitors and present the effects on visual evoked potentials (VEPs) and event-related potentials (ERPs). Additionally we present a method for correcting the monitor raster latency and analyzed the performance difference of a code-modulated VEP BCI speller by correcting the latency. There are currently no other methods validating the effects of monitor raster latency on VEPs and ERPs. The timings of VEPs and ERPs are directly affected by the raster latency. Furthermore, correcting the raster latency resulted in a significant reduction of the target prediction error from 7.98% to 4.61% and also in a more reliable classification of targets by significantly increasing the distance between the most probable and the second most probable target by 18.23%. The monitor raster latency affects the timings of VEPs and ERPs, and correcting resulted in a significant error reduction of 42.23%. It is recommend to correct the raster latency for an increased BCI performance and methodical correctness. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. Monitor for detecting and assessing exposure to airborne nanoparticles

    International Nuclear Information System (INIS)

    Marra, Johan; Voetz, Matthias; Kiesling, Heinz-Juergen

    2010-01-01

    An important safety aspect of the workplace environment concerns the severity of its air pollution with nanoparticles (NP; <100 nm) and ultrafine particles (UFP; <300 nm). Depending on their size and chemical nature, exposure to these particles through inhalation can be hazardous because of their intrinsic ability to deposit in the deep lung regions and the possibility to subsequently pass into the blood stream. Recommended safety measures in the nanomaterials industry are pragmatic, aiming at exposure minimization in general, and advocating continuous control by monitoring both the workplace air pollution level and the personal exposure to airborne NPs. This article describes the design and operation of the Aerasense NP monitor that enables intelligence gathering in particular with respect to airborne particles in the 10-300 nm size range. The NP monitor provides real time information about their number concentration, average size, and surface areas per unit volume of inhaled air that deposit in the various compartments of the respiratory tract. The monitor's functionality relies on electrical charging of airborne particles and subsequent measurements of the total particle charge concentration under various conditions. Information obtained with the NP monitor in a typical workplace environment has been compared with simultaneously recorded data from a Scanning Mobility Particle Sizer (SMPS) capable of measuring the particle size distribution in the 11-1086 nm size range. When the toxicological properties of the engineered and/or released particles in the workplace are known, personal exposure monitoring allows a risk assessment to be made for a worker during each workday, when the workplace-produced particles can be distinguished from other (ambient) particles.

  15. UV spectrophotometry for monitoring the performance of a yeast-based deoxygenation process to treat ships' ballast water.

    Science.gov (United States)

    Veilleux, Éloïse; de Lafontaine, Yves; Thomas, Olivier

    2016-04-01

    This study assessed the usefulness of UV spectrophotometry for the monitoring of a yeast-based deoxygenation process proposed for ships' ballast water treatment to prevent the transfer of aquatic invasive species. Ten-day laboratory experiments using three treatment concentrations and different water types were conducted and resulted in complete oxygen depletion of treated waters. The treatment performance and quality of treated waters were determined by measuring the UV-visible absorbance spectra of water samples taken over time. Samples were also used for laboratory analysis of water quality properties. The UV absorbance spectra values were strongly correlated (r = 0.96) to yeast cell density in treated waters. The second-order derivative (D (2)) of the spectra varied greatly over time, and the spectrum profiles could be divided into two groups corresponding to the oxygenated and anoxic phases of the treatment. The D (2) value at 215 nm was strongly correlated (r = 0.94) to ammonia levels, which increased over time. The D (2) value at 225 nm was strongly correlated (r > 0.97) to DO concentration. Our results showed that UV spectrophotometry may provide a rapid assessment of the behavior and performance of the yeast bioreactor over time by quantifying (1) the density of yeast cells, (2) the time at which anoxic conditions were reached, and (3) a water quality index of the treated water related to the production of ammonia. We conclude that the rapidity of the technique confers a solid advantage over standard methods used for water quality analysis in laboratory and would permit the direct monitoring of the treatment performance on-board ships.

  16. Assessing the performance of mental health service facilities for meeting patient priorities and health service responsiveness.

    Science.gov (United States)

    Bramesfeld, A; Stegbauer, C

    2016-10-01

    The World Health Organisation has defined health service responsiveness as one of the key-objectives of health systems. Health service responsiveness relates to the ability to respond to service users' legitimate expectations on non-medical issues when coming into contact with the services of a healthcare system. It is defined by the areas showing respect for persons and patient orientation. Health service responsiveness is particularly relevant to mental health services, due to the specific vulnerability of mental health patients but also because it matches what mental health patients consider as good quality of care as well as their priorities when seeking healthcare. As (mental) health service responsiveness applies equally to all concerned services it would be suitable as a universal indicator for the quality of services' performance. However, performance monitoring programs in mental healthcare rarely assess health service performance with respect to meeting patient priorities. This is in part due of patient priorities as an outcome being underrepresented in studies that evaluate service provision. The lack of studies using patient priorities as outcomes transmits into evidence based guidelines and subsequently, into underrepresentation of patient priorities in performance monitoring. Possible ways out of this situation include more intervention studies using patient priorities as outcome, considering evidence from qualitative studies in guideline development and developing performance monitoring programs along the patient pathway and on key-points of relevance for service quality from a patient perspective.

  17. Post-assessment of pre-stressed containment structures by evaluation of monitored long term deformation results

    International Nuclear Information System (INIS)

    Wienand, B.

    2015-01-01

    The comparison of monitored long term deformations of containment structures with calculated values achieved by using design material parameters shows occasionally considerable deviations, partly caused by conservative assumptions in the containments design phase. Systematic post-assessment and adaption of the decisive parameters attains better coincidence. In the present investigation measured long-term deformations are first of all compared to pre-calculated values based on the material parameters defined in the design phase. Afterwards, the deformations deviations are minimized by repeating the calculation with assessed material parameters. This method appears to be a suitable method to predict the future containment structure long-term behavior and to achieve a possible life-time extension. The presented investigation was performed as part of NUGENIA ACCEPPT project which researches the ageing of concrete containment structures in nuclear power plants

  18. Geoelectrical Methods and Monitoring for Dam Safety Assessment, Republic of Korea

    Science.gov (United States)

    Lim, S. K.; Oldenburg, D.; Kang, S.; Song, S. H.

    2016-12-01

    Geoelectrical methods and monitoring to detect the seepage and internal erosion are essential for the safety assessment of earth dams. This work aims to develop improved methodologies to analyze the observed data and to monitor changes in seepage flow using direct current (DC) and self-potential (SP) methods. The seasonal variation of water level at dams causes a change in seepage and water saturation and hence alters the resistivity of the dam material. DC data are sensitive to water saturation and hence changes in saturation can be obtained by repeatedly measuring DC data. However, a more diagnostic parameter for safety assessment is fluid flow, and resistivity is only weakly coupled to that. Fortunately SP signals are directly related to fluid flow, and thus an SP survey has the potential to characterize fluid flow through the earth matrix. In Korea, the safety assessment of earth fill dams has been dealt by Korea Rural Community Corporation (KRC). Most of the dams are relatively old ( >50 years), hence assessing deterioration and corresponding seepage of those dams are crucial. In order to evaluate the engineering geological properties of the soil at earth dams in Korea, two boreholes in each dam were drilled to a bedrock depth that exceeds the height of the dam. A large set of field tests, including standard penetration tests (SPT) and in-situ permeability tests, were carried out along the boreholes. However, seepage paths in the dam is complex hence those limited measurements at a few points is not sufficient to delineate the zone of preferential seepage flow. For this, KRC developed permanent DC monitoring systems at a number of agricultural dams in Korea. The data were automatically collected every 6 hours. During the monitoring, the measurements of the water level at two boreholes were gathered at the same time. In this presentation we select an agricultural dam and delineate an anomalous leakage zone by inverting and interpreting time-lapse DC resistivity

  19. Indicators to assess the environmental performances of an innovative subway station : example of Noisy-Champs

    Science.gov (United States)

    Schertzer, D. J. M.; Charbonnier, L.; Versini, P. A.; Tchiguirinskaia, I.

    2017-12-01

    Noisy-Champs is a train station located in Noisy-le-Grand and Champs-sur-Marne, in the Paris urban area (France). Integrated into the Grand Paris Express project (huge development project to modernise the transport network around Paris), this station is going to be radically transformed and become a major hub. Designed by the architectural office Duthilleul, the new Noisy-Champs station aspires to be an example of an innovative and sustainable infrastructure. Its architectural precepts are indeed meant to improve its environmental performances, especially those related to storm water management, water consumption and users' thermal and hygrometric comfort. In order to assess and monitor these performances, objectives and associated indicators have been developed. They aim to be adapted for a specific infrastructure such as a public transport station. Analyses of pre-existing comfort simulations, blueprints and regulatory documents have led to identify the main issues for the Noisy-Champs station, focusing on its resilience to extreme events like droughts, heatwaves and heaxvy rainfalls. Both objectives and indicators have been proposed by studying the space-time variabilities of physical fluxes (heat, pollutants, radiation, wind and water) and passenger flows, and their interactions. Each indicator is linked to an environmental performance and has been determined after consultation of the different stakeholders involved in the rebuilding of the station. It results a monitoring program to assess the environmental performances of the station composed by both the indicators grid and their related objectives, and a measurement program detailing the nature and location of sensors, and the frequency of measurements.

  20. Increasing the Performance and Reliability of Power Boiler by Monitoring Thermal and Strength Parameters

    Directory of Open Access Journals (Sweden)

    Sobota Tomasz

    2017-01-01

    Full Text Available The paper presents a method for determination of thermo-flow parameters for steam boilers. This method allows to perform the calculations of the boiler furnace chamber and heat flow rates absorbed by superheater stages. These parameters are important for monitoring the performance of the power unit. Knowledge of these parameters allows determining the degree of the furnace chamber slagging. The calculation can be performed in online mode and use to monitoring of steam boiler. The presented method allows to the operation of steam boiler with high efficiency.

  1. Application of Structure Monitoring Systems to the Assessment of the Behaviour of Bridges in Mining Areas

    Science.gov (United States)

    Parkasiewicz, Beata; Kadela, Marta; Bętkowski, Piotr; Sieńko, Rafał; Bednarski, Łukasz

    2017-10-01

    Structure monitoring systems are increasingly used to assess the technical condition and improve the safety of structures. Monitoring the structural behaviour becomes necessary in the case of structures located in areas with complicated ground conditions. Due to the risk of failures and the resulting economic and non-material costs, monitoring should be in particular applied to linear structures, including railways, tramlines, motorways and expressways, as well as related facilities (e.g. bridges). Monitoring shall consist in regular observations, measurements and documenting all significant data during construction, after its completion and during usage, and in analysing and evaluating the results. This paper presents the application of structure monitoring systems to the assessment of the behaviour of bridges exposed to the impact of mining operations.

  2. Monitoring and analysis of the performance of the Elianto photovoltaic system

    International Nuclear Information System (INIS)

    De Lia, F.

    2008-01-01

    The assessment of annual increase in the output of a two-axis tracking photovoltaic system, as a compared to a fixed one, is the result of a monitoring activity, which has been carried out successfully for nearly two years on an experimental plant in the province of Treviso [it

  3. Performance assessment review for DOE LLW disposal facilities

    International Nuclear Information System (INIS)

    Wilhite, Elmer L.

    1992-01-01

    The United States Department of Energy (US DOE) disposes of low-level radioactive waste in near-surface disposal facilities. Safety of the disposal operations is evaluated for operational safety as well as long-term safety. Operational safety is evaluated based on the perceived level of hazard of the operation and may vary from a simple safety assessment to a safety analysis report. Long-term safety of all low-level waste disposal systems is evaluated through the conduct of a radiological performance assessment. The US DOE has established radiological performance objectives for disposal of low-level waste. They are to protect a member of the general public from receiving over 25 mrem/y, and an inadvertent intruder into the waste from receiving over 100 mrem/y continuous exposure or 500 mrem from a single exposure. For a disposal system to be acceptable, a performance assessment must be prepared which must be technically accurate and provide reasonable assurance that these performance objectives are met. Technical quality of the performance assessments is reviewed by a panel of experts. The panel of experts is used in two ways to assure the technical quality of performance assessment. A preliminary (generally 2 day) review by the panel is employed in the late stages of development to provide guidance on finalizing the performance assessment. The comments from this review are communicated to the personnel responsible for the performance assessment for consideration and incorporation. After finalizing the performance assessment, it is submitted for a formal review. The formal review is accomplished by a much more thorough analysis of the performance assessment over a multi-week time period. The panel then formally reports their recommendations to the US DOE waste management senior staff who make the final determination on acceptability of the performance assessment. A number of lessons have been learned from conducting several preliminary reviews of performance

  4. Assessing isocyanate exposures in polyurethane industry sectors using biological and air monitoring methods.

    Science.gov (United States)

    Creely, K S; Hughson, G W; Cocker, J; Jones, K

    2006-08-01

    Isocyanates, as a chemical group, are considered to be the biggest cause of occupational asthma in the UK. Monitoring of airborne exposures to total isocyanate is costly, requiring considerable expertise, both in terms of sample collection and chemical analysis and cannot be used to assess the effectiveness of protection from wearing respiratory protective equipment (RPE). Biological monitoring by analysis of metabolites in urine can be a relatively simple and inexpensive way to assess exposure to isocyanates. It may also be a useful way to evaluate the effectiveness of control measures in place. In this study biological and inhalation monitoring were undertaken to assess exposure in a variety of workplaces in the non-motor vehicle repair sector. Companies selected to participate in the survey included only those judged to be using good working practices when using isocyanate formulations. This included companies that used isocyanates to produce moulded polyurethane products, insulation material and those involved in industrial painting. Air samples were collected by personal monitoring and were analysed for total isocyanate content. Urine samples were collected soon after exposure and analysed for the metabolites of different isocyanate species, allowing calculation of the total metabolite concentration. Details of the control measures used and observed contamination of exposed skin were also recorded. A total of 21 companies agreed to participate in the study, with exposure measurements being collected from 22 sites. The airborne isocyanate concentrations were generally very low (range 0.0005-0.066 mg m(-3)). A total of 50 of the 70 samples were polyurethane foam insulation (0.023 mg m(-3)). The most commonly detected isocyanate in the urine was hexamethylene diisocyanate, which was detected in 21 instances. The geometric mean total isocyanate metabolite concentration for the dataset was 0.29 micromol mol(-1) creatinine (range 0.05-12.64 micromol mol(-1

  5. Statistical monitoring of linear antenna arrays

    KAUST Repository

    Harrou, Fouzi

    2016-11-03

    The paper concerns the problem of monitoring linear antenna arrays using the generalized likelihood ratio (GLR) test. When an abnormal event (fault) affects an array of antenna elements, the radiation pattern changes and significant deviation from the desired design performance specifications can resulted. In this paper, the detection of faults is addressed from a statistical point of view as a fault detection problem. Specifically, a statistical method rested on the GLR principle is used to detect potential faults in linear arrays. To assess the strength of the GLR-based monitoring scheme, three case studies involving different types of faults were performed. Simulation results clearly shown the effectiveness of the GLR-based fault-detection method to monitor the performance of linear antenna arrays.

  6. Bird biodiversity assessments in temperate forest: the value of point count versus acoustic monitoring protocols

    Directory of Open Access Journals (Sweden)

    Brian T. Klingbeil

    2015-05-01

    Full Text Available Effective monitoring programs for biodiversity are needed to assess trends in biodiversity and evaluate the consequences of management. This is particularly true for birds and faunas that occupy interior forest and other areas of low human population density, as these are frequently under-sampled compared to other habitats. For birds, Autonomous Recording Units (ARUs have been proposed as a supplement or alternative to point counts made by human observers to enhance monitoring efforts. We employed two strategies (i.e., simultaneous-collection and same-season to compare point count and ARU methods for quantifying species richness and composition of birds in temperate interior forests. The simultaneous-collection strategy compares surveys by ARUs and point counts, with methods matched in time, location, and survey duration such that the person and machine simultaneously collect data. The same-season strategy compares surveys from ARUs and point counts conducted at the same locations throughout the breeding season, but methods differ in the number, duration, and frequency of surveys. This second strategy more closely follows the ways in which monitoring programs are likely to be implemented. Site-specific estimates of richness (but not species composition differed between methods; however, the nature of the relationship was dependent on the assessment strategy. Estimates of richness from point counts were greater than estimates from ARUs in the simultaneous-collection strategy. Woodpeckers in particular, were less frequently identified from ARUs than point counts with this strategy. Conversely, estimates of richness were lower from point counts than ARUs in the same-season strategy. Moreover, in the same-season strategy, ARUs detected the occurrence of passerines at a higher frequency than did point counts. Differences between ARU and point count methods were only detected in site-level comparisons. Importantly, both methods provide similar

  7. Delaware Basin Monitoring Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2001-09-28

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. EPA requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard and must consider inadvertent drilling into the repository at some future time.

  8. Delaware Basin Monitoring Annual Report

    International Nuclear Information System (INIS)

    2001-01-01

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. EPA requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard and must consider inadvertent drilling into the repository at some future time.

  9. Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility

    International Nuclear Information System (INIS)

    King, J.W.

    1993-01-01

    The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction

  10. Monitoring the Long-Term Performance of Engineered Containment Systems: Role of Ecological Processes

    International Nuclear Information System (INIS)

    Traynham, B.; Clarke, J.H.; Burger, J.; Waugh, J.

    2009-01-01

    Engineered covers have been widely used to minimize water infiltration into landfills used by U. S. Department of Energy (DOE) for the disposal of radioactive and hazardous chemical waste. The degradation of engineered covers over time is a complex process that is influenced by site specific characteristics, the structure and dynamics of the indigenous plant community, and the interplay of physical and biological factors at contaminated sites. It is necessary to develop a rigorous method to evaluate long-term performance of covers and other engineered barriers with quantification of risk and uncertainty. Because many of the contaminants of concern are long-lived, this methodology must consider changes in the environmental setting (e.g., precipitation, temperature) and cover components for long time periods (>100 years). Current monitoring approaches focus solely on hydrologic properties of the cover system. Additionally, cover design guidelines, such as those from RCRA, are not performance based and do not consider long-term site-specific influences such as climate, vegetation, and soils. Fundamental ecological processes such as succession are not even factored into current models, yet they directly affect the integrity of landfill covers through biointrusion, erosion, and water balance. Therefore, it is useful to identify ecological parameters and processes most important to performance for prioritization of site characterization and long-term monitoring activities. This investigation into the role of ecological monitoring of isolation containment systems utilizes the software platform GoldSim to identify important parameters and processes for performance verification and monitoring. (authors)

  11. Wire system aging assessment and condition monitoring (WASCO)

    International Nuclear Information System (INIS)

    Fantoni, P.F.

    2007-04-01

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report contains some test results of a method for wire system condition monitoring, developed at the Halden Reactor Project, called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. (au)

  12. System of ecological monitoring and assessment (EMA) for nuclear power plant site areas

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Oleinikov, N.F.; Reznichenko, V.Yu.

    1988-01-01

    The goal of the EMA program is to improve the utilization of the natural and labor resources of the city of Sosnovyi Bor due to the opportune discovery of negative changes in the state of the surrounding environment and human health and to predict and assess the possible consequences of implementing technological and economic decisions and their optimization from the point of view of ecology with regard to reactor siting and sizing. The EMA system provides monitoring means and a data bank on the environment and health of workers and the population, a packet of programs for processing and analyzing data, and a set of models to describe and predict the condition of the object/environment/man system. The system monitors contamination sources, monitors and assesses aquatic and terrestrial ecosystems, and accounts for meteorological and biosolar factors which impact on reactor siting

  13. RECREATION MONITORING OF RESOURCE CONDITIONS IN THE KRONOTSKY STATE NATURAL BIOSPHERE PRESERVE (KAMCHATKA: AN INITIAL ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Anna Zavadskaya

    2011-01-01

    Full Text Available The paper describes assessment and monitoring program which has been designed and initiated for monitoring recreational impacts in some wildernesses areas of Kamchatka. The framework of the recreational assessment was tested through its application in a case study conducted during the summer 2008 in the Kronotsky State Natural Biosphere Preserve (the Kamchatka peninsula, Russia. The overall objective of the case study was to assess the existing campsite and trail recreation impacts and to establish a network of key sites for the subsequent long-term impact monitoring. The detailed assessment of different components of natural complexes of the Kronotsky State Natural Preserve and the obtained maps of their ecological conditions showed that some sites had been highly disturbed. The results of these works have given rise to a concern that the intensive use of these areas would make an unacceptable impact on the nature. Findings of our initial work corroborate the importance of founding wilderness management programs on knowledge about the trail and campsite impacts and emphasize the necessity of adopting the recreational assessment and monitoring framework to the practice of decision-making.

  14. Resilient monitoring systems: architecture, design, and application to boiler/turbine plant.

    Science.gov (United States)

    Garcia, Humberto E; Lin, Wen-Chiao; Meerkov, Semyon M; Ravichandran, Maruthi T

    2014-11-01

    Resilient monitoring systems, considered in this paper, are sensor networks that degrade gracefully under malicious attacks on their sensors, causing them to project misleading information. The goal of this paper is to design, analyze, and evaluate the performance of a resilient monitoring system intended to monitor plant conditions (normal or anomalous). The architecture developed consists of four layers: data quality assessment, process variable assessment, plant condition assessment, and sensor network adaptation. Each of these layers is analyzed by either analytical or numerical tools. The performance of the overall system is evaluated using a simplified boiler/turbine plant. The measure of resiliency is quantified based on the Kullback-Leibler divergence and shown to be sufficiently high in all scenarios considered.

  15. An assessment of seismic monitoring in the United States; requirement for an Advanced National Seismic System

    Science.gov (United States)

    ,

    1999-01-01

    This report assesses the status, needs, and associated costs of seismic monitoring in the United States. It sets down the requirement for an effective, national seismic monitoring strategy and an advanced system linking national, regional, and urban monitoring networks. Modernized seismic monitoring can provide alerts of imminent strong earthquake shaking; rapid assessment of distribution and severity of earthquake shaking (for use in emergency response); warnings of a possible tsunami from an offshore earthquake; warnings of volcanic eruptions; information for correctly characterizing earthquake hazards and for improving building codes; and data on response of buildings and structures during earthquakes, for safe, cost-effective design, engineering, and construction practices in earthquake-prone regions.

  16. Visual metaphors on anaesthesia monitors do not improve anaesthetists' performance in the operating theatre

    NARCIS (Netherlands)

    van Amsterdam, K.; Cnossen, F.; Ballast, A.; Struys, M. M. R. F.

    Background. Previous research using a metaphorical anaesthesia monitor, where dimensions of rectangles proportionally represent 30 patient variable values, showed improved performance in diagnosing adverse events compared with the standard monitor. Steady-state values were represented by a frame

  17. Land desertification monitoring and assessment in Yulin of Northwest China using remote sensing and geographic information systems (GIS).

    Science.gov (United States)

    Zhang, Yuanzhi; Chen, Zhengyi; Zhu, Boqin; Luo, Xiuyue; Guan, Yanning; Guo, Shan; Nie, Yueping

    2008-12-01

    The objective of this study is to develop techniques for assessing and analysing land desertification in Yulin of Northwest China, as a typical monitoring region through the use of remotely sensed data and geographic information systems (GIS). The methodology included the use of Landsat TM data from 1987, 1996 and 2006, supplemented by aerial photos in 1960, topographic maps, field work and use of other existing data. From this, land cover, the Normalised Difference Vegetation Index (NDVI), farmland, woodland and grassland maps at 1:100,000 were prepared for land desertification monitoring in the area. In the study, all data was entered into a GIS using ILWIS software to perform land desertification monitoring. The results indicate that land desertification in the area has been developing rapidly during the past 40 years. Although land desertification has to some extent been controlled in the area by planting grasses and trees, the issue of land desertification is still serious. The study also demonstrates an example of why the integration of remote sensing with GIS is critical for the monitoring of environmental changes in arid and semi-arid regions, e.g. in land desertification monitoring in the Yulin pilot area. However, land desertification monitoring using remote sensing and GIS still needs to be continued and also refined for the purpose of long-term monitoring and the management of fragile ecosystems in the area.

  18. Identification of Natural Oscillation Modes for Purposes of Seismic Assessment and Monitoring of HPP Dams

    Energy Technology Data Exchange (ETDEWEB)

    Kuz’menko, A. P., E-mail: apkuzm@gmail.com; Saburov, S. V., E-mail: saburov58@yandex.ru [Russian Academy of Sciences, Computer Equipment Design Technology Institute, Siberian Branch (Russian Federation)

    2016-07-15

    The paper puts forward a method for processing data from detailed seismic assessments of HPP dams (dynamic tests). A detailed assessment (hundreds of observation points in dam galleries) is performed with consideration of operating dam equipment and the microseismic noise. It is shown that dynamic oscillation characteristics (natural oscillation frequencies and modes in the main dam axes, the velocities of propagation of elastic waves with given polarization, and so on.) can be determined with sufficient accuracy by using complex transfer functions and pulse characteristics. Monitoring data is processed using data from a detailed assessment, taking account of identified natural oscillation modes and determined ranges of natural frequencies. The spectra of characteristic frequencies thus obtained are used to choose substitution models and estimate the elastic characteristics of the “dam – rock bed” construction system, viz., the modulus of elasticity (the Young modulus), the Poisson ratio, the dam section stiffness with respect to shear, tension and compression and the elastic characteristics of the rock foundation.

  19. Federal Radiological Monitoring and Assessment Center (FRMAC) overview of FRMAC operations

    International Nuclear Information System (INIS)

    1996-02-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response plan (FRERP). This cooperative effort will assure the designated Lead Federal Agency (LFA) and the state(s) that all federal radiological assistance fully supports their efforts to protect the public. The mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) Operations describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas. These off-site areas may include one or more affected states

  20. Statistical analysis of RHIC beam position monitors performance

    Science.gov (United States)

    Calaga, R.; Tomás, R.

    2004-04-01

    A detailed statistical analysis of beam position monitors (BPM) performance at RHIC is a critical factor in improving regular operations and future runs. Robust identification of malfunctioning BPMs plays an important role in any orbit or turn-by-turn analysis. Singular value decomposition and Fourier transform methods, which have evolved as powerful numerical techniques in signal processing, will aid in such identification from BPM data. This is the first attempt at RHIC to use a large set of data to statistically enhance the capability of these two techniques and determine BPM performance. A comparison from run 2003 data shows striking agreement between the two methods and hence can be used to improve BPM functioning at RHIC and possibly other accelerators.

  1. Statistical analysis of RHIC beam position monitors performance

    Directory of Open Access Journals (Sweden)

    R. Calaga

    2004-04-01

    Full Text Available A detailed statistical analysis of beam position monitors (BPM performance at RHIC is a critical factor in improving regular operations and future runs. Robust identification of malfunctioning BPMs plays an important role in any orbit or turn-by-turn analysis. Singular value decomposition and Fourier transform methods, which have evolved as powerful numerical techniques in signal processing, will aid in such identification from BPM data. This is the first attempt at RHIC to use a large set of data to statistically enhance the capability of these two techniques and determine BPM performance. A comparison from run 2003 data shows striking agreement between the two methods and hence can be used to improve BPM functioning at RHIC and possibly other accelerators.

  2. Wide Area Measurement Based Security Assessment & Monitoring of Modern Power System: A Danish Power System Case Study

    DEFF Research Database (Denmark)

    Rather, Zakir Hussain; Chen, Zhe; Thøgersen, Paul

    2013-01-01

    Power System security has become a major concern across the global power system community. This paper presents wide area measurement system (WAMS) based security assessment and monitoring of modern power system. A new three dimensional security index (TDSI) has been proposed for online security...... monitoring of modern power system with large scale renewable energy penetration. Phasor measurement unit (PMU) based WAMS has been implemented in western Danish Power System to realize online security monitoring and assessment in power system control center. The proposed security monitoring system has been...

  3. Monitoring User-Based Accessibility Assessment in Urban Environments and in Public Buildings

    Directory of Open Access Journals (Sweden)

    Gintaras Stauskis

    2018-04-01

    Full Text Available The research features analysis of user-experience-based accessibility assessment and progress monitoring of buildings and public spaces; this analysis is used as a tool for facilitating the development of humane, socially sustainable and an inclusive urban environment. A group of users representing people with different kinds of disabilities, the elderly and families with children was created to assess the quality of access to various buildings with different functions and locations across Vilnius and in Singapore. A school, two hospitals, a rehab centre and two offices were selected for access monitoring in Vilnius City, while a hotel, a café and two metro stations with public squares were chosen for access assessment in Singapore. As the same method was principally applied to assess accessibility of selected buildings in Vilnius City in 2000 and 2017 and in Singapore in 2012, the article draws a comparative analysis of access levels in these two cities located in different global regions. The results show a definite improvement of access quality over time and also identify the critical aspects in this process. The segment of plot planning represents the lowest quality of access for all assessed building types as compared to the building segment and the external–internal element segments. The paper also draws conclusions that access improvement is a continuous process of implementing advanced urban policy instruments, and city planners can contribute to it by constantly analysing and presenting to public the monitoring data about the progress in access improvement. Comparing the assessment results between Vilnius City and Singapore – cities that are located in different global regions and in different socio-economic environments – provides a practical tool for benchmarking and setting the priorities for this process.

  4. A Meta-Analysis of Self-Monitoring on Reading Performance of K-12 Students

    Science.gov (United States)

    Guzman, Guadalupe; Goldberg, Taryn S.; Swanson, H. Lee

    2018-01-01

    The published single-case design (SCD) research (N = 19 articles) on self-monitoring and reading performance was synthesized. The following inclusion criteria were used: (a) the study must have been peer-reviewed, (b) implemented an intervention targeting student self-monitoring of reading skills, (c) included data on at least 1 reading outcome,…

  5. Systematic monitoring of male circumcision scale-up in Nyanza, Kenya: exploratory factor analysis of service quality instrument and performance ranking.

    Science.gov (United States)

    Omondi Aduda, Dickens S; Ouma, Collins; Onyango, Rosebella; Onyango, Mathews; Bertrand, Jane

    2014-01-01

    Considerable conceptual and operational complexities related to service quality measurements and variability in delivery contexts of scaled-up medical male circumcision, pose real challenges to monitoring implementation of quality and safety. Clarifying latent factors of the quality instruments can enhance contextual applicability and the likelihood that observed service outcomes are appropriately assessed. To explore factors underlying SYMMACS service quality assessment tool (adopted from the WHO VMMC quality toolkit) and; determine service quality performance using composite quality index derived from the latent factors. Using a comparative process evaluation of Voluntary Medical Male Circumcision Scale-Up in Kenya site level data was collected among health facilities providing VMMC over two years. Systematic Monitoring of the Medical Male Circumcision Scale-Up quality instrument was used to assess availability of guidelines, supplies and equipment, infection control, and continuity of care services. Exploratory factor analysis was performed to clarify quality structure. Fifty four items and 246 responses were analyzed. Based on Eigenvalue >1.00 cut-off, factors 1, 2 & 3 were retained each respectively having eigenvalues of 5.78; 4.29; 2.99. These cumulatively accounted for 29.1% of the total variance (12.9%; 9.5%; 6.7%) with final communality estimates being 13.06. Using a cut-off factor loading value of ≥0.4, fifteen items loading on factor 1, five on factor 2 and one on factor 3 were retained. Factor 1 closely relates to preparedness to deliver safe male circumcisions while factor two depicts skilled task performance and compliance with protocols. Of the 28 facilities, 32% attained between 90th and 95th percentile (excellent); 45% between 50th and 75th percentiles (average) and 14.3% below 25th percentile (poor). the service quality assessment instrument may be simplified to have nearly 20 items that relate more closely to service outcomes. Ranking of

  6. Self-assessment: Strategy for higher standards, consistency, and performance

    International Nuclear Information System (INIS)

    Ide, W.E.

    1996-01-01

    In late 1994, Palo Verde operations underwent a transformation from a unitized structure to a single functional unit. It was necessary to build consistency in watchstanding practices and create a shared mission. Because there was a lack of focus on actual plant operations and because personnel were deeply involved with administrative tasks, command and control of evolutions were weak. Improvement was needed. Consistent performance standards have been set for all three operating units. These expectation focus on nuclear, radiological, and industrial safety. Straightforward descriptions of watchstanding and monitoring practices have been provided to all department personnel. The desired professional and leadership qualities for employee conduct have been defined and communicated thoroughly. A healthy and competitive atmosphere developed with the successful implementation of these standards. Overall performance improved. The auxiliary operators demonstrated increased pride and ownership in the performance of their work activities. In addition, their morale improved. Crew teamwork improved as well as the quality of shift briefs. There was a decrease in the noise level and the administrative functions in the control room. The use of self-assessment helped to anchor and define higher and more consistent standards. The proof of Palo Verde's success was evident when an Institute of Nuclear Power Operations finding was turned into a strength within 1 yr

  7. Evaluation of Activity Recognition Algorithms for Employee Performance Monitoring

    OpenAIRE

    Mehreen Mumtaz; Hafiz Adnan Habib

    2012-01-01

    Successful Human Resource Management plays a key role in success of any organization. Traditionally, human resource managers rely on various information technology solutions such as Payroll and Work Time Systems incorporating RFID and biometric technologies. This research evaluates activity recognition algorithms for employee performance monitoring. An activity recognition algorithm has been implemented that categorized the activity of employee into following in to classes: job activities and...

  8. Developing an Indicator System for Monitoring, Analyzing, and Assessing Airport Sustainability

    NARCIS (Netherlands)

    Janic, M.

    2010-01-01

    This paper deals with developing an indicator system for monitoring, analyzing, and assessing sustainability of airports. The sustainability implies simultaneous increasing of the overall socialeconomic benefits and increasing at a slower rate, stagnating, and/or diminishing of the negative impacts

  9. Application of monitoring, diagnosis, and prognosis in thermal performance analysis for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyeong Min; Heo, Gyun Young [Kyung Hee University, Yongin (Korea, Republic of); Na, Man Gyun [Chosun University, Gwangju (Korea, Republic of)

    2014-12-15

    As condition-based maintenance (CBM) has risen as a new trend, there has been an active movement to apply information technology for effective implementation of CBM in power plants. This motivation is widespread in operations and maintenance, including monitoring, diagnosis, prognosis, and decision-making on asset management. Thermal efficiency analysis in nuclear power plants (NPPs) is a longstanding concern being updated with new methodologies in an advanced IT environment. It is also a prominent way to differentiate competitiveness in terms of operations and maintenance costs. Although thermal performance tests implemented using industrial codes and standards can provide officially trustworthy results, they are essentially resource-consuming and maybe even a hind-sighted technique rather than a foresighted one, considering their periodicity. Therefore, if more accurate performance monitoring can be achieved using advanced data analysis techniques, we can expect more optimized operations and maintenance. This paper proposes a framework and describes associated methodologies for in-situ thermal performance analysis, which differs from conventional performance monitoring. The methodologies are effective for monitoring, diagnosis, and prognosis in pursuit of CBM. Our enabling techniques cover the intelligent removal of random and systematic errors, deviation detection between a best condition and a currently measured condition, degradation diagnosis using a structured knowledge base, and prognosis for decision-making about maintenance tasks. We also discuss how our new methods can be incorporated with existing performance tests. We provide guidance and directions for developers and end-users interested in in-situ thermal performance management, particularly in NPPs with large steam turbines.

  10. Application of monitoring, diagnosis, and prognosis in thermal performance analysis for nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Hyeong Min; Heo, Gyun Young; Na, Man Gyun

    2014-01-01

    As condition-based maintenance (CBM) has risen as a new trend, there has been an active movement to apply information technology for effective implementation of CBM in power plants. This motivation is widespread in operations and maintenance, including monitoring, diagnosis, prognosis, and decision-making on asset management. Thermal efficiency analysis in nuclear power plants (NPPs) is a longstanding concern being updated with new methodologies in an advanced IT environment. It is also a prominent way to differentiate competitiveness in terms of operations and maintenance costs. Although thermal performance tests implemented using industrial codes and standards can provide officially trustworthy results, they are essentially resource-consuming and maybe even a hind-sighted technique rather than a foresighted one, considering their periodicity. Therefore, if more accurate performance monitoring can be achieved using advanced data analysis techniques, we can expect more optimized operations and maintenance. This paper proposes a framework and describes associated methodologies for in-situ thermal performance analysis, which differs from conventional performance monitoring. The methodologies are effective for monitoring, diagnosis, and prognosis in pursuit of CBM. Our enabling techniques cover the intelligent removal of random and systematic errors, deviation detection between a best condition and a currently measured condition, degradation diagnosis using a structured knowledge base, and prognosis for decision-making about maintenance tasks. We also discuss how our new methods can be incorporated with existing performance tests. We provide guidance and directions for developers and end-users interested in in-situ thermal performance management, particularly in NPPs with large steam turbines.

  11. Storm Water Control Management & Monitoring

    Science.gov (United States)

    2017-11-30

    Temple and Villanova universities collected monitoring and assessment data along the I-95 corridor to evaluate the performance of current stormwater control design and maintenance practices. An extensive inventory was developed that ranks plants in t...

  12. Monitored retrievable storage submission to Congress: Volume 2, Environmental assessment for a monitored retrievable storage facility

    International Nuclear Information System (INIS)

    1986-02-01

    This Environmental Assessment (EA) supports the DOE proposal to Congress to construct and operate a facility for monitored retrievable storage (MRS) of spent fuel at a site on the Clinch River in the Roane County portion of Oak Ridge, Tennessee. The first part of this document is an assessment of the value of, need for, and feasibility of an MRS facility as an integral component of the waste management system. The second part is an assessment and comparison of the potential environmental impacts projected for each of six site-design combinations. The MRS facility would be centrally located with respect to existing reactors, and would receive and canister spent fuel in preparation for shipment to and disposal in a geologic repository. 207 refs., 57 figs., 132 tabs

  13. The Effect of Monitoring Committees on the Relationship between Board Structure and Firm Performance

    Directory of Open Access Journals (Sweden)

    Aymen Ammari

    2016-12-01

    Full Text Available The purpose of this study is to investigate the impact of board structure on the performance of French firms in the presence of several monitoring committees. We studied 80 publicly listed French firms spanning from 2001 to 2013. We concluded that large board size has a negative effect on market performance. While large board size in combination with the existence of at least three committees enhances accounting performance and does not have any impact on market performance, the existence of a board dominated by independent directors with the presence of at least three committees seems to have only a negative impact on accounting performance. Our findings indicate that monitoring committees are beneficial for shareholders only for corporations with a large board size.

  14. Performance Objective for Tank Farm Closure Risk Assessments

    International Nuclear Information System (INIS)

    MANN, F.M.; KNEPP, A.J.; BADDEN, J.

    2003-01-01

    To be meaningful, results from a numeric risk assessment of the consequences of an action must be compared against the standards for such an action. That is, before one disposes of waste or closes a facility with waste, one must show that the disposal or closure action protects the public health and safety and the environment. These standards are called performance objectives. Regulations requiring performing performance assessments, (whether federal ones like the Department of Energy [DOE] Order 435.1, Radioactive Waste Management and its implementing guides or Washington State ones like the regulations implementing the Washington Administrative Code [WAC] 173-340 ''Model Toxics Control Act - Cleanup''), usually require that the determination of performance objectives be one of the first steps performed. These performance objectives not only set comparison level for the numeric results, but also define the media, pathways, exposure scenarios (receptors), spatial locations, and times that the performance assessment must consider. Thus, a performance objective consists of a compliance level, place(s) of compliance, and time(s) of compliance. Performance objectives are not the levels that a regulatory agency will enforce in a permit or authorization. Those levels, often called enforcement levels, will be set in the permit or authorization. Rather, performance objectives are those levels against which the results of the numeric simulation will be compared to judge the success of the proposed cleanup or disposal actions. Additional comparison levels may be requested for information purposes, but are not officially part of the decision on the adequacy of the proposed action. To emphasize that the performance objectives discussed in this document are not regulatory performance objectives, the three components of the performance objective will be renamed in this document as assessment standard, point(s) of assessment, and time(s) of assessment. However, whenever

  15. Patient-Centered Technological Assessment and Monitoring of Depression for Low-Income Patients

    OpenAIRE

    Wu, Shinyi; Vidyanti, Irene; Liu, Pai; Hawkins, Caitlin; Ramirez, Magaly; Guterman, Jeffrey; Gross-Schulman, Sandra; Sklaroff, Laura Myerchin; Ell, Kathleen

    2014-01-01

    Depression is a significant challenge for ambulatory care because it worsens health status and outcomes, increases health care utilizations and costs, and elevates suicide risk. An automatic telephonic assessment (ATA) system that links with tasks and alerts to providers may improve quality of depression care and increase provider productivity. We used ATA system in a trial to assess and monitor depressive symptoms of 444 safety-net primary care patients with diabetes. We assessed system prop...

  16. Performance assessment - risk assessment vive la differences

    International Nuclear Information System (INIS)

    Nitschke, R.L.

    1997-01-01

    In the sister worlds of radioactive waste management disposal and environmental restoration, there are two similar processes and computational approaches for determining the acceptability of the proposed activities. While similar, these two techniques can lead to confusion and misunderstanding if the differences are not recognized and appreciated. In the case of radioactive waste management, the performance assessment process is used to determine compliance with certain prescribed 'performance objectives'. These objectives are designed to ensure that the disposal of radioactive (high-level, low-level, and/or transuranic) waste will be protective of human health and the environment. The environmental link is primarily through assuring protection of the groundwater as a resource. In the case of environmental restoration, the risk assessment process is used to determine the proper remedial action response, if any, for a past hazardous waste release. The process compares the 'no action' or 'leave as is' option with both carcinogenic and noncarcinogenic values for human health to determine the need for any action and to help to help determine just what the appropriate action would need to be. The impacts to the ecological system are evaluated in a slightly, different but similar fashion. Now the common objectives between these two processes notwithstanding. There are some key and fundamental differences that need to be answered that make direct comparisons or a common approach inappropriate. Failure to recognize this can lead to confusion and misunderstanding. This can be particularly problematic when one is faced with an active disposal facility located within the boundaries of an environmental restoration site as is the case at the Idaho National Engineering Laboratory (INEL). Through a critical evaluation of the performance assessment and risk assessment processes, highlighting both similarities and differences, it is hoped that greater understanding and appreciation

  17. Human biological monitoring of occupational genotoxic exposures

    DEFF Research Database (Denmark)

    Knudsen, Lisbeth E.; Sorsa, M

    1993-01-01

    Human biological monitoring is a valuable tool for exposure assessment in groups of persons occupationally exposed to genotoxic agents. If the monitoring activity covers genetic material the term genetic monitoring is used. The methods used for genetic monitoring are either substance specific, e......) occupational exposure limit value of styrene in ambient air. The consideration of ethical issues in human genetic monitoring is an important but often overlooked aspect. This includes the scientific and preventional relevance of performing a test on individuals, pre- and post study information of donors...

  18. National Coral Reef Monitoring Program: Assessing and Monitoring Cryptic Reef Diversity of Colonizing Marine Invertebrates using Autonomous Reef Monitoring Structure (ARMS) Deployed at Coral Reef Sites across American Samoa from 2012 to 2015

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Autonomous Reef Monitoring Structures (ARMS) are used to assess and monitor cryptic reef diversity of colonizing marine invertebrates in the Hawaiian and Mariana...

  19. Performance objectives for the Hanford Immobilized Low-Activity Waste (ILAW) performance assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    1999-01-01

    Performance objectives for the disposal of low activity waste from Hanford Waste Tanks have been developed. These objectives have been based on DOE requirements, programmatic requirements, and public involvement. The DOE requirements include regulations that direct the performance assessment and are cited within the Radioactive Waste Management Order (DOE Order 435.1). Performance objectives for other DOE complex performance assessments have been included

  20. Task 1. Monitoring real time materials degradation. NRC extended In-situ and real-time Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Bakhtiari, Sasan [Argonne National Lab. (ANL), Argonne, IL (United States)

    2012-03-01

    The overall objective of this project was to perform a scoping study to identify, in concert with the nuclear industry, those sensors and techniques that have the most promising commercial viability and fill a critical inspection or monitoring need. Candidates to be considered include sensors to monitor real-time material degradation, characterize residual stress, monitor and inspect component fabrication, assess radionuclide and associated chemical species concentrations in ground water and soil, characterize fuel properties, and monitor severe accident conditions. Under Task 1—Monitoring Real-Time Materials Degradation—scoping studies were conducted to assess the feasibility of potential inspection and monitoring technologies (i.e., a combination of sensors, advanced signal processing techniques, and data analysis methods) that could be utilized in LWR and/or advanced reactor applications for continuous monitoring of degradation in-situ. The goal was to identify those techniques that appear to be the most promising, i.e., those that are closest to being both technically and commercially viable and that the nuclear industry is most likely to pursue. Current limitations and associated issues that must be overcome before commercial application of certain techniques have also been addressed.

  1. [Electronic fetal monitoring and management of adverse outcomes: how to perform and improve a training program for clinicians?].

    Science.gov (United States)

    Secourgeon, J-F

    2012-10-01

    Electronic fetal monitoring during labor is the most commonly used method to evaluate the fetal status, but it remains exposed to some criticism. By comparison with intermittent auscultation and in the light of the results of the great studies in the last 30 years, it may be accused its failure to improve the neonatal outcome and its responsibility in the increase on operative deliveries. Actually, the electronic fetal monitoring is a tool whose effectiveness is linked to the accuracy of the analysis developed by the clinician. Studies on assessment of the tracing interpretation indicate that there is always a lack of quality, which may be improved through training programs. It also reveals the benefit of the fetal blood sampling to reduce operative deliveries and the generalization of this method, in addition to electronic fetal monitoring, is recommended by referral agencies. More generally, the continuous monitoring is only a part of the patient safety strategy in the labour ward and we are currently observing, in some European countries and in the United States, the development of training programs concerning the management of the adverse outcomes in obstetrics. The good performances related to the quality of care are demonstrated by the findings of the studies performed in the centers that have implemented an active training policy. In France, the professionals directly involved in the field of the perinatology should benefit from such educational programs that could be organized within the care networks under the authority of referral agencies. Copyright © 2012 Elsevier Masson SAS. All rights reserved.

  2. Monitoring Instrument Performance in Regional Broadband Seismic Network Using Ambient Seismic Noise

    Science.gov (United States)

    Ye, F.; Lyu, S.; Lin, J.

    2017-12-01

    In the past ten years, the number of seismic stations has increased significantly, and regional seismic networks with advanced technology have been gradually developed all over the world. The resulting broadband data help to improve the seismological research. It is important to monitor the performance of broadband instruments in a new network in a long period of time to ensure the accuracy of seismic records. Here, we propose a method that uses ambient noise data in the period range 5-25 s to monitor instrument performance and check data quality in situ. The method is based on an analysis of amplitude and phase index parameters calculated from pairwise cross-correlations of three stations, which provides multiple references for reliable error estimates. Index parameters calculated daily during a two-year observation period are evaluated to identify stations with instrument response errors in near real time. During data processing, initial instrument responses are used in place of available instrument responses to simulate instrument response errors, which are then used to verify our results. We also examine feasibility of the tailing noise using data from stations selected from USArray in different locations and analyze the possible instrumental errors resulting in time-shifts used to verify the method. Additionally, we show an application that effects of instrument response errors that experience pole-zeros variations on monitoring temporal variations in crustal properties appear statistically significant velocity perturbation larger than the standard deviation. The results indicate that monitoring seismic instrument performance helps eliminate data pollution before analysis begins.

  3. Continuous emission monitoring systems for power plants. The state-of-the-art

    International Nuclear Information System (INIS)

    Bamberger, J.A.

    1988-01-01

    Continuous monitoring of power plant emissions is performed to improve combustion and control equipment efficiency, and in response to various government agency requirements. This paper focuses upon recent developments in Continuous Emission Monitoring (CEM) and Systems (CEMS) for power plants. Topics presented include the perspective of the U.S. Environmental Protection Agency and the states: Continuous Monitoring of Power Plant Emissions - An EPA Perspective; Pennsylvania's Proposed Continuous Emission Monitoring System Data Telemetry Requirements for Municipal, Hospital and Infectious Waste Incinerators; the importance of quality assurance; Continuous Emission Monitoring and Quality Assurance Requirements for New Power Plants; Highlights of Pennsylvania's Continuous Emission Monitoring System Quality Assurance Program; improved system specifications and data acquisition methods; Improved Specifications for Continuous Emission Monitoring; A Microcomputer-Based Data Acquisition System for CEMS; CEMS applications; Expanded Use of CEMS in Acid Rain Control Programs: Opinions of Users, Control Agencies and Vendors; and an innovative measurement technique to assess electrostatic precipitator performance; The Assessment of Pulverized Coal Fly Ash Collection in Electrostatic Precipitators Using an Instrumental Assessment Technique

  4. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  5. Preliminary melter performance assessment report

    International Nuclear Information System (INIS)

    Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

    1994-08-01

    The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory's (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design

  6. Monitoring radiation damage in the ATLAS pixel detector

    CERN Document Server

    Schorlemmer, André Lukas; Quadt, Arnulf; Große-Knetter, Jörn; Rembser, Christoph; Di Girolamo, Beniamino

    2014-11-05

    Radiation hardness is one of the most important features of the ATLAS pixel detector in order to ensure a good performance and a long lifetime. Monitoring of radiation damage is crucial in order to assess and predict the expected performance of the detector. Key values for the assessment of radiation damage in silicon, such as the depletion voltage and depletion depth in the sensors, are measured on a regular basis during operations. This thesis summarises the monitoring program that is conducted in order to assess the impact of radiation damage and compares it to model predictions. In addition, the physics performance of the ATLAS detector highly depends on the amount of disabled modules in the ATLAS pixel detector. A worrying amount of module failures was observed during run I. Thus it was decided to recover repairable modules during the long shutdown (LS1) by extracting the pixel detector. The impact of the module repairs and module failures on the detector performance is analysed in this thesis.

  7. Baseline requirements for assessment of mining impact using biological monitoring

    International Nuclear Information System (INIS)

    Humphrey, C.L.; Dostine, P.L.

    1995-01-01

    Biological monitoring programmes for environmental protection should provide for both early detection of possible adverse effects, and assessment of the ecological significance of these effects. Monitoring techniques are required that include responses sensitive to the impact, that can be subjected to rigorous statistical analysis and for which statistical power is high. Such issues in baseline research of 'what and how to measure?' and 'for how long?' have been the focus of a programme being developed to monitor and assess effects of mining operations on the essentially pristine, freshwater ecosystems of the Alligator Rivers Region (ARR) in tropical northern Australia. Application of the BACIP (Before, After, Control, Impact, Paired differences) design, utilizing a form of temporal replication, to univariate (single species) and multivariate (community) data is described. The BACIP design incorporates data from single control and impact sites. We argue for modification of the design for particular studies conducted in streams, to incorporate additional independent control sites from adjacent catchment. Inferential power, by way of (i) more confidently attributing cause to an observed change and (ii) providing information about the ecological significance of the change, will be enhanced using a modified BACIP design. In highly valued environments such as the ARR, monitoring programmes require application of statistical tests with high power to guarantee that an impact no greater than a prescribed amount has gone undetected. A minimum number of baseline years using the BACIP approach would therefore be required in order to achieve some desired level of statistical power. This paper describes the results of power analyses conducted on 2-5 years (depending upon the technique) of baseline data from streams of the ARR and discuss the implications of these results for management. 44 refs., 1 tab., 3 figs

  8. Utilizing distributional analytics and electronic records to assess timeliness of inpatient blood glucose monitoring in non-critical care wards

    Directory of Open Access Journals (Sweden)

    Ying Chen

    2016-04-01

    Full Text Available Abstract Background Regular and timely monitoring of blood glucose (BG levels in hospitalized patients with diabetes mellitus is crucial to optimizing inpatient glycaemic control. However, methods to quantify timeliness as a measurement of quality of care are lacking. We propose an analytical approach that utilizes BG measurements from electronic records to assess adherence to an inpatient BG monitoring protocol in hospital wards. Methods We applied our proposed analytical approach to electronic records obtained from 24 non-critical care wards in November and December 2013 from a tertiary care hospital in Singapore. We applied distributional analytics to evaluate daily adherence to BG monitoring timings. A one-sample Kolmogorov-Smirnov (1S-KS test was performed to test daily BG timings against non-adherence represented by the uniform distribution. This test was performed among wards with high power, determined through simulation. The 1S-KS test was coupled with visualization via the cumulative distribution function (cdf plot and a two-sample Kolmogorov-Smirnov (2S-KS test, enabling comparison of the BG timing distributions between two consecutive days. We also applied mixture modelling to identify the key features in daily BG timings. Results We found that 11 out of the 24 wards had high power. Among these wards, 1S-KS test with cdf plots indicated adherence to BG monitoring protocols. Integrating both 1S-KS and 2S-KS information within a moving window consisting of two consecutive days did not suggest frequent potential change from or towards non-adherence to protocol. From mixture modelling among wards with high power, we consistently identified four components with high concentration of BG measurements taken before mealtimes and around bedtime. This agnostic analysis provided additional evidence that the wards were adherent to BG monitoring protocols. Conclusions We demonstrated the utility of our proposed analytical approach as a monitoring

  9. Dissolved oxygen mapping: A powerful tool for site assessments and ground water monitoring

    International Nuclear Information System (INIS)

    Newman, W.A.; Kimball, G.

    1992-01-01

    Dissolved oxygen concentration profiles often provide an excellent indication of the natural biological activity of microorganisms in ground water. The analysis of dissolved oxygen in ground water also provides a rapid, inexpensive method for determining the areal extent of contaminant plumes containing aerobically degraded compounds such as petroleum hydrocarbons. Indigenous hydrocarbon degrading organisms are present at most petroleum product spills giving this technique an almost universal application for dissolved hydrocarbons in ground water. Data from several sites will be presented to demonstrate the relationship between oxygen and dissolved contaminant concentrations. The inverse relationship between oxygen concentrations and dissolved contaminants can be used in many ways. During the initial site assessment, rapid on-site testing of ground water can provide real time data to direct drilling by identification of potentially contaminated locations. Several analytical techniques are available that allow field analysis to be performed in less than five minutes. Dissolved oxygen testing also provides an inexpensive way to monitor hydrocarbon migration without expensive gas chromatography. Often a plume of oxygen depleted ground water extends farther downgradient than the dissolved hydrocarbon plume. The depletion of oxygen in a well can provide an early warning system that detects upgradient contamination before the well is impacted by detectable levels of contaminants. Another application is the measurement of the natural degradation potential for aerobic remediation. If an aerobic in-situ remediation is used, dissolved oxygen monitoring provides an inexpensive method to monitor the progress of the remediation

  10. Indicators to monitor NPP safety performance. Working material

    International Nuclear Information System (INIS)

    1997-01-01

    Numerical indicators to monitor safety status and overall safety performance of nuclear power plants (NPPs) are used by operators and some regulators worldwide. During the last few years, the IAEA, through Technical Committee Meetings and Consultants' Meetings has worked on this area. This report presents a framework for nuclear power plant safety performance indicators that was developed during two consultant meetings held at the IAEA headquarters in Vienna in December 1995 and November 1996. Annex 2 on risk based indicators was prepared during a consultants' meeting held in Vienna in July 1996. An additional outcome from these activities, was the recommendation that the IAEA conduce pilot exercises at several nuclear power plants that might be interested to participate, in order to test the validity of the concept and its usefulness. 6 figs

  11. Energy performance assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Platzer, W.J. [Fraunhofer Inst. for Solar Energy Systems, Freiburg (Germany)

    2006-01-15

    The energy performance of buildings are intimately connected to the energy performance of building envelopes. The better we understand the relation between the quality of the envelope and the energy consumption of the building, the better we can improve both. We have to consider not only heating but all service energies related to the human comfort in the building, such as cooling, ventilation, lighting as well. The complexity coming from this embracing approach is not to be underestimated. It is less and less possible to realted simple characteristic performance indicators of building envelopes (such as the U-value) to the overall energy performance. On the one hand much more paramters (e.g. light transmittance) come into the picture we have to assess the product quality in a multidimensional world. Secondly buildings more and more have to work on a narrow optimum: For an old, badly insulated building all solar gains are useful for a high-performance building with very good insulation and heat recovery systems in the ventilation overheating becomes more likely. Thus we have to control the solar gains, and sometimes we need high gains, sometimes low ones. And thirdly we see that the technology within the building and the user patterns and interactions as well influence the performance of a building envelope. The aim of this project within IEA Task27 was to improve our knowledge on the complex situation and also to give a principal approach how to assess the performance of the building envelope. The participants have contributed to this aim not pretending that we have reached the end. (au)

  12. Investigating General Chemistry Students' Metacognitive Monitoring of Their Exam Performance by Measuring Postdiction Accuracies over Time

    Science.gov (United States)

    Hawker, Morgan J.; Dysleski, Lisa; Rickey, Dawn

    2016-01-01

    Metacognitive monitoring of one's own understanding plays a key role in learning. An aspect of metacognitive monitoring can be measured by comparing a student's prediction or postdiction of performance (a judgment made before or after completing the relevant task) with the student's actual performance. In this study, we investigated students'…

  13. Enhanced FBG sensor-based system performance assessment for monitoring strain along a prestressed CFRP rod in structural monitoring

    DEFF Research Database (Denmark)

    Kerrouche, A.; Boyle, W.J.O.; Sun, T.

    2009-01-01

    of the existing FBG-based system and the evaluation of the software developed to be compatible with a resolution reaching as high as +/- 0.15 mu epsilon is presented. The system has been tested under particular conditions where a prestressed CFRP (carbon fiber reinforced polymer) rod to which a FBG sensor......Fiber Bragg grating (FBG) sensor-based systems have been widely used for many engineering applications including most recently a number of applications in structural health monitoring. It is well known that strain and temperature both affect the FBG spectrum which in the interrogation system...

  14. Assessing hospitals' clinical risk management: Development of a monitoring instrument

    Directory of Open Access Journals (Sweden)

    Pfeiffer Yvonne

    2010-12-01

    Full Text Available Abstract Background Clinical risk management (CRM plays a crucial role in enabling hospitals to identify, contain, and manage risks related to patient safety. So far, no instruments are available to measure and monitor the level of implementation of CRM. Therefore, our objective was to develop an instrument for assessing CRM in hospitals. Methods The instrument was developed based on a literature review, which identified key elements of CRM. These elements were then discussed with a panel of patient safety experts. A theoretical model was used to describe the level to which CRM elements have been implemented within the organization. Interviews with CRM practitioners and a pilot evaluation were conducted to revise the instrument. The first nationwide application of the instrument (138 participating Swiss hospitals was complemented by in-depth interviews with 25 CRM practitioners in selected hospitals, for validation purposes. Results The monitoring instrument consists of 28 main questions organized in three sections: 1 Implementation and organizational integration of CRM, 2 Strategic objectives and operational implementation of CRM at hospital level, and 3 Overview of CRM in different services. The instrument is available in four languages (English, German, French, and Italian. It allows hospitals to gather comprehensive and systematic data on their CRM practice and to identify areas for further improvement. Conclusions We have developed an instrument for assessing development stages of CRM in hospitals that should be feasible for a continuous monitoring of developments in this important area of patient safety.

  15. Assessing hospitals' clinical risk management: Development of a monitoring instrument.

    Science.gov (United States)

    Briner, Matthias; Kessler, Oliver; Pfeiffer, Yvonne; Wehner, Theo; Manser, Tanja

    2010-12-13

    Clinical risk management (CRM) plays a crucial role in enabling hospitals to identify, contain, and manage risks related to patient safety. So far, no instruments are available to measure and monitor the level of implementation of CRM. Therefore, our objective was to develop an instrument for assessing CRM in hospitals. The instrument was developed based on a literature review, which identified key elements of CRM. These elements were then discussed with a panel of patient safety experts. A theoretical model was used to describe the level to which CRM elements have been implemented within the organization. Interviews with CRM practitioners and a pilot evaluation were conducted to revise the instrument. The first nationwide application of the instrument (138 participating Swiss hospitals) was complemented by in-depth interviews with 25 CRM practitioners in selected hospitals, for validation purposes. The monitoring instrument consists of 28 main questions organized in three sections: 1) Implementation and organizational integration of CRM, 2) Strategic objectives and operational implementation of CRM at hospital level, and 3) Overview of CRM in different services. The instrument is available in four languages (English, German, French, and Italian). It allows hospitals to gather comprehensive and systematic data on their CRM practice and to identify areas for further improvement. We have developed an instrument for assessing development stages of CRM in hospitals that should be feasible for a continuous monitoring of developments in this important area of patient safety.

  16. The Dutch Health Care Performance Report: seven years of health care performance assessment in the Netherlands

    NARCIS (Netherlands)

    van den Berg, Michael J.; Kringos, Dionne S.; Marks, Lisanne K.; Klazinga, Niek S.

    2014-01-01

    In 2006, the first edition of a monitoring tool for the performance of the Dutch health care system was released: the Dutch Health Care Performance Report (DHCPR). The Netherlands was among the first countries in the world developing such a comprehensive tool for reporting performance on quality,

  17. Determination of Safety Performance Grade of NPP Using Integrated Safety Performance Assessment (ISPA) Program

    International Nuclear Information System (INIS)

    Chung, Dae Wook

    2011-01-01

    Since the beginning of 2000, the safety regulation of nuclear power plant (NPP) has been challenged to be conducted more reasonable, effective and efficient way using risk and performance information. In the United States, USNRC established Reactor Oversight Process (ROP) in 2000 for improving the effectiveness of safety regulation of operating NPPs. The main idea of ROP is to classify the NPPs into 5 categories based on the results of safety performance assessment and to conduct graded regulatory programs according to categorization, which might be interpreted as 'Graded Regulation'. However, the classification of safety performance categories is highly comprehensive and sensitive process so that safety performance assessment program should be prepared in integrated, objective and quantitative manner. Furthermore, the results of assessment should characterize and categorize the actual level of safety performance of specific NPP, integrating all the substantial elements for assessing the safety performance. In consideration of particular regulatory environment in Korea, the integrated safety performance assessment (ISPA) program is being under development for the use in the determination of safety performance grade (SPG) of a NPP. The ISPA program consists of 6 individual assessment programs (4 quantitative and 2 qualitative) which cover the overall safety performance of NPP. Some of the assessment programs which are already implemented are used directly or modified for incorporating risk aspects. The others which are not existing regulatory programs are newly developed. Eventually, all the assessment results from individual assessment programs are produced and integrated to determine the safety performance grade of a specific NPP

  18. Monitoring Performance of a combined water recycling system

    OpenAIRE

    Castleton, H.F.; Hathway, E.A.; Murphy, E.; Beck, S.B.M.

    2014-01-01

    Global water demand is expected to outstrip supply dramatically by 2030, making water recycling an important tool for future water security. A large combined grey water and rainwater recycling system has been monitored in response to an identified knowledge gap of the in-use performance of such systems. The water saving efficiency of the system was calculated at −8ṡ5% in 2011 and –10% in 2012 compared to the predicted 36%. This was due to a lower quantity of grey water and rainwater being col...

  19. Spatial scan statistics to assess sampling strategy of antimicrobial resistance monitoring programme

    DEFF Research Database (Denmark)

    Vieira, Antonio; Houe, Hans; Wegener, Henrik Caspar

    2009-01-01

    Pie collection and analysis of data on antimicrobial resistance in human and animal Populations are important for establishing a baseline of the occurrence of resistance and for determining trends over time. In animals, targeted monitoring with a stratified sampling plan is normally used. However...... sampled by the Danish Integrated Antimicrobial Resistance Monitoring and Research Programme (DANMAP), by identifying spatial Clusters of samples and detecting areas with significantly high or low sampling rates. These analyses were performed for each year and for the total 5-year study period for all...... by an antimicrobial monitoring program....

  20. Monitoring and risk assessment of pesticides in irrigation systems in Debra Zeit, Ethiopia.

    NARCIS (Netherlands)

    Teklu, Berhan M.; Adriaanse, Pauline; Brink, Van den Paul J.

    2016-01-01

    Since Ethiopia is going through a rapid transformation of its agricultural sector, we assessed the human health and environmental risks due to the past use of organochlorine pesticides (OCPs) as well as the risks of the current pesticide use by farmers. A monitoring programme and risk assessment

  1. Subjective and objective performance assessment : Performance pay at Trelleborg Forsheda AB

    OpenAIRE

    Luotonen, David; Hasselström, Markus

    2009-01-01

      The purpose of this thesis is to understand the opinions and potential effects of objective and subjective assessments of performance as a basis for performance pay for blue-collar workers. The study takes a qualitative approach to find out how and why four companies - Trelleborg Forsheda, Finnveden Powertrain, Isaberg Rapid and Parker Hannifin- work with salaries, incentive system and performance assessment the way they do. The concept of individual salary is central in this thesis, and in...

  2. Gamma camera performance: technical assessment protocol

    International Nuclear Information System (INIS)

    Bolster, A.A.; Waddington, W.A.

    1996-01-01

    This protocol addresses the performance assessment of single and dual headed gamma cameras. No attempt is made to assess the performance of any associated computing systems. Evaluations are usually performed on a gamma camera commercially available within the United Kingdom and recently installed at a clinical site. In consultation with the manufacturer, GCAT selects the site and liaises with local staff to arrange a mutually convenient time for assessment. The manufacturer is encouraged to have a representative present during the evaluation. Three to four days are typically required for the evaluation team to perform the necessary measurements. When access time is limited, the team will modify the protocol to test the camera as thoroughly as possible. Data are acquired on the camera's computer system and are subsequently transferred to the independent GCAT computer system for analysis. This transfer from site computer to the independent system is effected via a hardware interface and Interfile data transfer. (author)

  3. Gamma camera performance: technical assessment protocol

    Energy Technology Data Exchange (ETDEWEB)

    Bolster, A.A. [West Glasgow Hospitals NHS Trust, London (United Kingdom). Dept. of Clinical Physics; Waddington, W.A. [University College London Hospitals NHS Trust, London (United Kingdom). Inst. of Nuclear Medicine

    1996-12-31

    This protocol addresses the performance assessment of single and dual headed gamma cameras. No attempt is made to assess the performance of any associated computing systems. Evaluations are usually performed on a gamma camera commercially available within the United Kingdom and recently installed at a clinical site. In consultation with the manufacturer, GCAT selects the site and liaises with local staff to arrange a mutually convenient time for assessment. The manufacturer is encouraged to have a representative present during the evaluation. Three to four days are typically required for the evaluation team to perform the necessary measurements. When access time is limited, the team will modify the protocol to test the camera as thoroughly as possible. Data are acquired on the camera`s computer system and are subsequently transferred to the independent GCAT computer system for analysis. This transfer from site computer to the independent system is effected via a hardware interface and Interfile data transfer. (author).

  4. Risk monitor-a tool for computer aided risk assessment for NPPs

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Kushwaha, H.S.; Hadap, Nikhil

    2001-01-01

    Considerable changes occur in components status and system design and subsequent operation due to changes in plant configuration and their operating procedures. These changes are organised because some components are randomly down and other can be planned for test, maintenance and repair. This results in a fluctuation of risk level over operating time, which is termed as risk profile. Probabilistic Safety Assessment (PSA) is an analytical technique for assessing the risk by integrating diverse aspects of design and operation of a Nuclear Power Plant. Risk can be defined as the product of the probability of an accident and the consequences from that accident. Reactor Safety Division of BARC has developed PC based tool, which can assess the risk profile. This package can be used to optimise the operation in Nuclear Power Plants with respect to a minimum risk level over the operating time, and is termed as Risk Monitor. Risk Monitor is user friendly and can re-evaluate core damage frequency for changes in component status, test interval, initiating event frequency etc. Plant restoration advice, when the plant is in high risk configuration, current status of all plant equipment, and equipment prioritization are also provided by the package. (author)

  5. Strategy for assessing occupational radiation monitoring data from many facilities for use in epidemiologic studies

    International Nuclear Information System (INIS)

    Strom, D.J.

    1984-01-01

    The process of transforming occupational radiation monitoring data into a form useful for epidemiology is called dose assessment. A review of previous dose assessment activities is done as a background for development of standard dose assessment procedures for use at many facilities. The scientific issues identified include the accuracy, precision, and comparability of doses over time and across facilities, the use of internal monitoring results; neutron quality factors; minimum detection limits; the quality and validity of data; and the impact of uncertainty in the exposure variable on misclassification of workers with respect to that variable. The standard dose assessment procedures developed address these issues, and include a method for determining what data are available and what form they are in, illustrated by application to 36 facilities in the US Department of Energy 5-Rem Study. The standard procedures are illustrated and tested on external and uranium monitoring results from the Y-12 Plant in Oak Ridge, Tennessee, where data permitted inferences of doses and variances to total body, skin, and lung, but not bone or kidney

  6. Fundamental and assessment of concrete structure monitoring by using acoustic emission technique testing: A review

    Science.gov (United States)

    Desa, M. S. M.; Ibrahim, M. H. W.; Shahidan, S.; Ghadzali, N. S.; Misri, Z.

    2018-04-01

    Acoustic emission (AE) technique is one of the non-destructive (NDT) testing, where it can be used to determine the damage of concrete structures such as crack, corrosion, stability, sensitivity, as structure monitoring and energy formed within cracking opening growth in the concrete structure. This article gives a comprehensive review of the acoustic emission (AE) technique testing due to its application in concrete structure for structural health monitoring (SHM). Assessment of AE technique used for structural are reviewed to give the perception of its structural engineering such as dam, bridge and building, where the previous research has been reviewed based on AE application. The assessment of AE technique focusing on basic fundamental of parametric and signal waveform analysis during analysis process and its capability in structural monitoring. Moreover, the assessment and application of AE due to its function have been summarized and highlighted for future references

  7. National Coral Reef Monitoring Program: Assessing and Monitoring Cryptic Reef Diversity of Colonizing Marine Invertebrates using Autonomous Reef Monitoring Structure (ARMS) Deployed at Coral Reef Sites across the Marianas Archipelago from 2011 to 2014

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Autonomous Reef Monitoring Structures (ARMS) are used to assess and monitor cryptic reef diversity of colonizing marine invertebrates in the Hawaiian and Mariana...

  8. National Coral Reef Monitoring Program: Assessing and Monitoring Cryptic Reef Diversity of Colonizing Marine Invertebrates using Autonomous Reef Monitoring Structure (ARMS) Deployed at Coral Reef Sites across the Hawaiian Archipelago from 2010 to 2016

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Autonomous Reef Monitoring Structures (ARMS) are used to assess and monitor cryptic reef diversity of colonizing marine invertebrates in the Hawaiian and Mariana...

  9. The Effects of Acute Dopamine Precursor Depletion on the Cognitive Control Functions of Performance Monitoring and Conflict Processing: An Event-Related Potential (ERP) Study.

    Science.gov (United States)

    Larson, Michael J; Clayson, Peter E; Primosch, Mark; Leyton, Marco; Steffensen, Scott C

    2015-01-01

    Studies using medications and psychiatric populations implicate dopamine in cognitive control and performance monitoring processes. However, side effects associated with medication or studying psychiatric groups may confound the relationship between dopamine and cognitive control. To circumvent such possibilities, we utilized a randomized, double-blind, placebo-controlled, within-subjects design wherein participants were administered a nutritionally-balanced amino acid mixture (BAL) and an amino acid mixture deficient in the dopamine precursors tyrosine (TYR) and phenylalanine (PHE) on two separate occasions. Order of sessions was randomly assigned. Cognitive control and performance monitoring were assessed using response times (RT), error rates, the N450, an event-related potential (ERP) index of conflict monitoring, the conflict slow potential (conflict SP), an ERP index of conflict resolution, and the error-related negativity (ERN) and error positivity (Pe), ERPs associated with performance monitoring. Participants were twelve males who completed a Stroop color-word task while ERPs were collected four hours following acute PHE and TYR depletion (APTD) or balanced (BAL) mixture ingestion in two separate sessions. N450 and conflict SP ERP amplitudes significantly differentiated congruent from incongruent trials, but did not differ as a function of APTD or BAL mixture ingestion. Similarly, ERN and Pe amplitudes showed significant differences between error and correct trials that were not different between APTD and BAL conditions. Findings indicate that acute dopamine precursor depletion does not significantly alter cognitive control and performance monitoring ERPs. Current results do not preclude the role of dopamine in these processes, but suggest that multiple methods for dopamine-related hypothesis testing are needed.

  10. The Effects of Acute Dopamine Precursor Depletion on the Cognitive Control Functions of Performance Monitoring and Conflict Processing: An Event-Related Potential (ERP Study.

    Directory of Open Access Journals (Sweden)

    Michael J Larson

    Full Text Available Studies using medications and psychiatric populations implicate dopamine in cognitive control and performance monitoring processes. However, side effects associated with medication or studying psychiatric groups may confound the relationship between dopamine and cognitive control. To circumvent such possibilities, we utilized a randomized, double-blind, placebo-controlled, within-subjects design wherein participants were administered a nutritionally-balanced amino acid mixture (BAL and an amino acid mixture deficient in the dopamine precursors tyrosine (TYR and phenylalanine (PHE on two separate occasions. Order of sessions was randomly assigned. Cognitive control and performance monitoring were assessed using response times (RT, error rates, the N450, an event-related potential (ERP index of conflict monitoring, the conflict slow potential (conflict SP, an ERP index of conflict resolution, and the error-related negativity (ERN and error positivity (Pe, ERPs associated with performance monitoring. Participants were twelve males who completed a Stroop color-word task while ERPs were collected four hours following acute PHE and TYR depletion (APTD or balanced (BAL mixture ingestion in two separate sessions. N450 and conflict SP ERP amplitudes significantly differentiated congruent from incongruent trials, but did not differ as a function of APTD or BAL mixture ingestion. Similarly, ERN and Pe amplitudes showed significant differences between error and correct trials that were not different between APTD and BAL conditions. Findings indicate that acute dopamine precursor depletion does not significantly alter cognitive control and performance monitoring ERPs. Current results do not preclude the role of dopamine in these processes, but suggest that multiple methods for dopamine-related hypothesis testing are needed.

  11. Evaluation of spot and passive sampling for monitoring, flux estimation and risk assessment of pesticides within the constraints of a typical regulatory monitoring scheme.

    Science.gov (United States)

    Zhang, Zulin; Troldborg, Mads; Yates, Kyari; Osprey, Mark; Kerr, Christine; Hallett, Paul D; Baggaley, Nikki; Rhind, Stewart M; Dawson, Julian J C; Hough, Rupert L

    2016-11-01

    In many agricultural catchments of Europe and North America, pesticides occur at generally low concentrations with significant temporal variation. This poses several challenges for both monitoring and understanding ecological risks/impacts of these chemicals. This study aimed to compare the performance of passive and spot sampling strategies given the constraints of typical regulatory monitoring. Nine pesticides were investigated in a river currently undergoing regulatory monitoring (River Ugie, Scotland). Within this regulatory framework, spot and passive sampling were undertaken to understand spatiotemporal occurrence, mass loads and ecological risks. All the target pesticides were detected in water by both sampling strategies. Chlorotoluron was observed to be the dominant pesticide by both spot (maximum: 111.8ng/l, mean: 9.35ng/l) and passive sampling (maximum: 39.24ng/l, mean: 4.76ng/l). The annual pesticide loads were estimated to be 2735g and 1837g based on the spot and passive sampling data, respectively. The spatiotemporal trend suggested that agricultural activities were the primary source of the compounds with variability in loads explained in large by timing of pesticide applications and rainfall. The risk assessment showed chlorotoluron and chlorpyrifos posed the highest ecological risks with 23% of the chlorotoluron spot samples and 36% of the chlorpyrifos passive samples resulting in a Risk Quotient greater than 0.1. This suggests that mitigation measures might need to be taken to reduce the input of pesticides into the river. The overall comparison of the two sampling strategies supported the hypothesis that passive sampling tends to integrate the contaminants over a period of exposure and allows quantification of contamination at low concentration. The results suggested that within a regulatory monitoring context passive sampling was more suitable for flux estimation and risk assessment of trace contaminants which cannot be diagnosed by spot

  12. A design methodology for unattended monitoring systems

    International Nuclear Information System (INIS)

    SMITH, JAMES D.; DELAND, SHARON M.

    2000-01-01

    The authors presented a high-level methodology for the design of unattended monitoring systems, focusing on a system to detect diversion of nuclear materials from a storage facility. The methodology is composed of seven, interrelated analyses: Facility Analysis, Vulnerability Analysis, Threat Assessment, Scenario Assessment, Design Analysis, Conceptual Design, and Performance Assessment. The design of the monitoring system is iteratively improved until it meets a set of pre-established performance criteria. The methodology presented here is based on other, well-established system analysis methodologies and hence they believe it can be adapted to other verification or compliance applications. In order to make this approach more generic, however, there needs to be more work on techniques for establishing evaluation criteria and associated performance metrics. They found that defining general-purpose evaluation criteria for verifying compliance with international agreements was a significant undertaking in itself. They finally focused on diversion of nuclear material in order to simplify the problem so that they could work out an overall approach for the design methodology. However, general guidelines for the development of evaluation criteria are critical for a general-purpose methodology. A poor choice in evaluation criteria could result in a monitoring system design that solves the wrong problem

  13. Practical session assessments in human anatomy: Weightings and performance.

    Science.gov (United States)

    McDonald, Aaron C; Chan, Siew-Pang; Schuijers, Johannes A

    2016-07-08

    Assessment weighting within a given module can be a motivating factor for students when deciding on their commitment level and time given to study a specific topic. In this study, an analysis of assessment performances of second year anatomy students was performed over four years to determine if (1) students performed better when a higher weighting was given to a set of practical session assessments and (2) whether an improved performance in the practical session assessments had a carry-over effect on other assessment tasks within that anatomy module and/or other anatomy modules that follow. Results showed that increasing the weighting of practical session assessments improved the average mark in that assessment and also improved the percentage of students passing that assessment. Further, it significantly improved performance in the written end-semester examination within the same module and had a carry-over effect on the anatomy module taught in the next teaching period, as students performed better in subsequent practical session assessments as well as subsequent end-semester examinations. It was concluded that the weighting of assessments had significant influences on a student's performance in that, and subsequent, assessments. It is postulated that practical session assessments, designed to develop deep learning skills in anatomy, improved efficacy in student performance in assessments undertaken in that and subsequent anatomy modules when the weighting of these assessments was greater. These deep learning skills were also transferable to other methods of assessing anatomy. Anat Sci Educ 9: 330-336. © 2015 American Association of Anatomists. © 2015 American Association of Anatomists.

  14. The Paradox of Authentic Selves and Chameleons: Self-monitoring, Perceived Job Autonomy and Contextual Performance

    OpenAIRE

    Giuseppe. Soda; Lorenzo. Bizzi

    2011-01-01

    We investigate how self-monitoring combines with the degree of perceived job autonomy to affect contextual performance. We explore both a mediation model, built on theories on individual differences in the perception of job characteristics, and a moderation model, built on theories of the interaction between personality and perceived job situation. Empirical evidence suggests that self-monitoring and perceived job autonomy significantly predict contextual performance. In addition, an inter...

  15. Indicators to monitor NPP operational safety performance

    International Nuclear Information System (INIS)

    Gomez-Cobo, Ana

    2002-01-01

    Since December 1995 the IAEA activities on safety performance indicators focused on the elaboration of a framework for the establishment of an operational safety performance indicator programme. The development of this framework began with the consideration of the concept of NPP operational safety performance and the identification of operational safety attributes. For each operational safety attribute, overall indicators, envisioned as providing an overall evaluation of relevant aspects of safety performance, were established. Associated with each overall indicator is a level of strategic indicators intended to provide a bridge from overall to specific indicators. Finally each strategic indicator was supported by a set of specific indicators, which represent quantifiable measures of performance. The programme development was enhanced by pilot plant studies, conducted over a 15 month period from January 1998 to March 1999. The result of all this work is compiled in the IAEA-TECDOC-1141, to be published shortly. This paper presents a summary of this IAEA TECDOC. It describes the operational safety performance indicator framework proposed and discusses the results of and lessons learned from the pilot studies. Despite the efforts described, it is clear that additional research is still necessary in areas such as plant-specific adaptation of proposed frameworks in order to suit individual data collection systems and plant characteristics, indicator selection, indicator definition, goal setting, action thresholds, analysis of trends, indicator display systems, analysis of overall safety performance (i.e., aggregation or combination of indicators), safety culture indicators, qualitative indicators, and use of additional indicators to address issues such as industrial safety attitude and performance, staff welfare, and environmental compliance. This is the rationale for a new IAEA Coordinated Research Project on 'Development and application of indicators to monitor NPP

  16. Facility effluent monitoring plan for WESF

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    1999-09-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the effluent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability.

  17. Facility effluent monitoring plan for WESF

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    1999-01-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the efferent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability

  18. User Performance Evaluation of Four Blood Glucose Monitoring Systems Applying ISO 15197:2013 Accuracy Criteria and Calculation of Insulin Dosing Errors.

    Science.gov (United States)

    Freckmann, Guido; Jendrike, Nina; Baumstark, Annette; Pleus, Stefan; Liebing, Christina; Haug, Cornelia

    2018-04-01

    The international standard ISO 15197:2013 requires a user performance evaluation to assess if intended users are able to obtain accurate blood glucose measurement results with a self-monitoring of blood glucose (SMBG) system. In this study, user performance was evaluated for four SMBG systems on the basis of ISO 15197:2013, and possibly related insulin dosing errors were calculated. Additionally, accuracy was assessed in the hands of study personnel. Accu-Chek ® Performa Connect (A), Contour ® plus ONE (B), FreeStyle Optium Neo (C), and OneTouch Select ® Plus (D) were evaluated with one test strip lot. After familiarization with the systems, subjects collected a capillary blood sample and performed an SMBG measurement. Study personnel observed the subjects' measurement technique. Then, study personnel performed SMBG measurements and comparison measurements. Number and percentage of SMBG measurements within ± 15 mg/dl and ± 15% of the comparison measurements at glucose concentrations performed by lay-users. The study was registered at ClinicalTrials.gov (NCT02916576). Ascensia Diabetes Care Deutschland GmbH.

  19. Intercomparison of performance characteristics of OSLDs and TLDs used for individual monitoring

    International Nuclear Information System (INIS)

    Meye, Phillipe Ondo

    2016-07-01

    This research work performed an intercomparison on some important performance characteristics of optically stimulated luminescence (OSL) and thermoluminescence (TL) dosimetry systems used by dosimetry services in Gabon and Ghana, respectively. The study verified the status of the selected performance indicators and propose ways to improve the performances of individual monitoring services of Ghana and Gabon if found necessary. The performance indicators assessed included the zero - dose, the minimum detectability and some important reader performance characteristics. These tests were performed using statistical and experimental methods. The overall uncertainty in measurement of the dosimetry systems of Ghana and Gabon for Hp(10) was determined using the IEC technical report TR 62461, and comparisons were carried out with IAEA 99, PTB 99, IEC 1066 and IEC1283 series performance standards. The IEC 62387 standard was used to assess the linearity dependence of the response and the coefficient of variation of the two dosimetry systems. For the Harshaw TLD 6600 system of the dosimetry service of Ghana, the Reference light QC test meets the requirement given in the user manual. For the OSL system microStar of the dosimetry system of Gabon, the three QC tests, DRK count, CAL count and LED count, meet the user manual requirements. However all these tests failed the statistical test that is part of counting statistics. This led to the conclusion that there may be some abnormalities in the counting system, and that the statistical abnormalities suspected have apparently no impact on the results of the reading. It was also concluded that since the DRK count and the CAL count failed the Chi - squared test by very small margin, a Gaussian distribution could still be considered as an approximation of the experimental data distributions of these two QC measurements. The zero dose for the Harshaw 6600 and the microStar system were found to be 0.026 mSv and 0.08 mSv respectively

  20. Assessment and monitoring of patients receiving chemotherapy for multiple myeloma: strategies to improve outcomes

    Directory of Open Access Journals (Sweden)

    Faiman B

    2016-05-01

    Full Text Available Beth Faiman, Jason Valent Department of Hematologic Oncology and Blood Disorders, Cleveland Clinic Taussig Cancer Institute, Cleveland, OH, USA Abstract: Improved understanding as to the biology of multiple myeloma (MM and the bone marrow microenvironment has led to the development of new drugs to treat MM. This explosion of new and highly effective drugs has led to dramatic advances in the management of MM and underscores the need for supportive care. Impressive and deep response rates to chemotherapy, monoclonal antibodies, and small molecule drugs provide hope of a cure or prolonged remission for the majority of individuals. For most patients, long-term, continuous therapy is often required to suppress the malignant plasma cell clone, thus requiring clinicians to become more astute in assessment, monitoring, and intervention of side effects as well as monitoring response to therapy. Appropriate diagnosis and monitoring strategies are essential to ensure that patients receive the appropriate chemotherapy and supportive therapy at relapse, and that side effects are appropriately managed to allow for continued therapy and adherence to the regimen. Multiple drugs with complex regimens are currently available with varying side effect profiles. Knowledge of the drugs used to treat MM and the common adverse events will allow for preventative strategies to mitigate adverse events and prompt intervention. The purpose of this paper is to review updates in the diagnosis and management of MM, and to provide strategies for assessment and monitoring of patients receiving chemotherapy for MM. Keywords: multiple myeloma, treatment, symptoms, assessment, monitoring, symptom management, targeted therapies

  1. An overview of inventory and monitoring and the Role of FIA in National Assessments

    Science.gov (United States)

    W. Brad Smith

    2006-01-01

    This paper presents a brief conceptual overview of inventory and monitoring and the role of the Forest Inventory and Analysis (FIA) program in national assessments. FIA has become a focal point of national inventory and monitoring and kept national leadership as well as forest resource research and management professionals apprised, through periodic reports to Congress...

  2. Development of sustainable performance indicators to assess the benefits of real-time monitoring in mechanised underground mining

    OpenAIRE

    Govindan, Rajesh; Cao, Wenzhuo; Korre, Anna; Durucan, Sevket; Graham, Peter; Simon, Clara; Barlow, Glenn; Pemberton, Ross

    2018-01-01

    This paper presents the development and quantification of a catalogue of Sustainable Performance Indicators (SPIs) for the assessment of the benefits real-time mining can offer in small and complex mechanised underground mining operations. The SPIs investigated in detail include: ‒ grade accuracy and error of the resource model, ‒ high/low grade ore classification accuracy and error, ‒ additional high grade ore identified per unit volume, ‒ profit expected per unit volume, ‒ or...

  3. Integrated System for Performance Monitoring of ATLAS TDAQ Network

    CERN Document Server

    Savu, D; The ATLAS collaboration; Martin, B; Sjoen, R; Batraneanu, S; Stancu, S

    2010-01-01

    The ATLAS TDAQ Network consists of three separate networks spanning four levels of the experimental building. Over 200 edge switches and 5 multi-blade chassis routers are used to interconnect 2000 processors, adding up to more than 7000 high speed interfaces. In order to substantially speed-up ad-hoc and post mortem analysis, a scalable, yet flexible, integrated system for monitoring both network statistics and environmental conditions, processor parameters and data taking characteristics was required. For successful up-to-the-minute monitoring, information from many SNMP compliant devices, independent databases and custom APIs was gathered, stored and displayed in an optimal way. Easy navigation and compact aggregation of multiple data sources were the main requirements; characteristics not found in any of the tested products, either open-source or commercial. This paper describes how performance, scalability and display issues were addressed and what challenges the project faced during development and deplo...

  4. Performance Assessment for e-Government Services: An Experience Report

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Yan; Zhu, Liming; Gorton, Ian

    2007-08-14

    The transformation and integration of government services, enabled by the use of new technologies such as application servers and Web services, is fundamental to reduce the cost of government and improving service outcomes to citizens. Many core Government information systems comprise applications running on legacy mainframes, databases and transaction processing monitors. As Governments worldwide provide direct access over the Internet to these legacy applications from the general public, they may be exposed to workloads well above the origin design parameters of these back-end systems. This creates a significant risk of high profile failures for Government agencies whose newly integrated systems become overloaded. In this paper we describe how we conducted a performance assessment of a business-critical, Internet-facing Web services that integrated new and legacy systems from two Australian Government agencies. We leveraged prototype tools from our own research along with known techniques in performance modeling. We were able to clearly demonstrate that the existing hardware and software would be adequate to handle the predicted workload for the next financial year. We were also able to do ‘what-if’ analysis and predict how the system can perform with alternative strategies to scale the system. We conclude by summarizing the lessons learnt, including the importance of architecture visibility, benchmarking data quality, and measurement feasibility due to issues of outsourcing, privacy legislation and cross-agency involvement.

  5. MONITORING TRAINING LOADS, STRESS, IMMUNE-ENDOCRINE RESPONSES AND PERFORMANCE IN TENNIS PLAYERS

    Directory of Open Access Journals (Sweden)

    Rodrigo Vitasovic Gomes

    2013-06-01

    Full Text Available The study aim was to investigate the effect of a periodised pre-season training plan on internal training load and subsequent stress tolerance, immune-endocrine responses and physical performance in tennis players. Well-trained young tennis players (n = 10 were monitored across the pre-season period, which was divided into 4 weeks of progressive overloading training and a 1-week tapering period. Weekly measures of internal training load, training monotony and stress tolerance (sources and symptoms of stress were taken, along with salivary testosterone, cortisol and immunoglobulin A. One repetition maximum strength, running endurance, jump height and agility were assessed before and after training. The periodised training plan led to significant weekly changes in training loads (i.e. increasing in weeks 3 and 4, decreasing in week 5 and post-training improvements in strength, endurance and agility (P < 0.05. Cortisol concentration and the symptoms of stress also increased in weeks 3 and/or 4, before returning to baseline in week 5 (P < 0.05. Conversely, the testosterone to cortisol ratio decreased in weeks 3 and 4, before returning to baseline in week 5 (P < 0.05. In conclusion, the training plan evoked adaptive changes in stress tolerance and hormonal responses, which may have mediated the improvements in physical performance.

  6. Enabling performance skills: Assessment in engineering education

    Science.gov (United States)

    Ferrone, Jenny Kristina

    Current reform in engineering education is part of a national trend emphasizing student learning as well as accountability in instruction. Assessing student performance to demonstrate accountability has become a necessity in academia. In newly adopted criterion proposed by the Accreditation Board for Engineering and Technology (ABET), undergraduates are expected to demonstrate proficiency in outcomes considered essential for graduating engineers. The case study was designed as a formative evaluation of freshman engineering students to assess the perceived effectiveness of performance skills in a design laboratory environment. The mixed methodology used both quantitative and qualitative approaches to assess students' performance skills and congruency among the respondents, based on individual, team, and faculty perceptions of team effectiveness in three ABET areas: Communications Skills. Design Skills, and Teamwork. The findings of the research were used to address future use of the assessment tool and process. The results of the study found statistically significant differences in perceptions of Teamwork Skills (p performance skills, such as teamwork, among freshman engineering students; (2) incorporate feedback into the learning process; (3) strengthen the assessment process with a follow-up plan that specifically targets performance skill deficiencies, and (4) integrate the assessment instrument and practice with ongoing curriculum development. The findings generated by this study provides engineering departments engaged in assessment activity, opportunity to reflect, refine, and develop their programs as it continues. It also extends research on ABET competencies of engineering students in an under-investigated topic of factors correlated with team processes, behavior, and student learning.

  7. Assessing Vocal Performances Using Analytical Assessment: A Case Study

    Science.gov (United States)

    Gynnild, Vidar

    2016-01-01

    This study investigated ways to improve the appraisal of vocal performances within a national academy of music. Since a criterion-based assessment framework had already been adopted, the conceptual foundation of an assessment rubric was used as a guide in an action research project. The group of teachers involved wanted to explore thinking…

  8. The use of accelerometers in the pavement performance monitoring and analysis

    International Nuclear Information System (INIS)

    Ryynaenen, T; Belt, J; Pellinen, T

    2010-01-01

    This study investigated the use of sensor technology to enhance the management of highway infrastructure. With the help of monitoring data, it is possible to assess the current analytical pavement analysis method, which is based on multi-layered elastic analysis, and, thus enhance the pavement design practices in use. Pavement response was measured using different sensors, installed at various depths. Most promising sensors for the continuous monitoring purposes were the accelerometers. The drawback of these sensors is that the measured quantity is acceleration, which must be converted to the deflection via mathematical integration. In this paper some issues related to the manipulation of accelerometer data is presented and discussed, in addition of the discussion of the calculated and measured pavement response.

  9. The ICESat-2 mission: design, status, applications and pre-launch performance assessments for monitoring cryopsheric changes

    Science.gov (United States)

    Neumann, T.; Markus, T.; Csatho, B. M.; Martino, A. J.

    2013-12-01

    NASA's Ice, Cloud, and land Elevation Satellite-2 (ICESat-2) is the next-generation orbiting laser altimeter, following the ICESat mission, which operated between 2003 and 2009. Its primary aim is to monitor sea-ice thickness and ice sheet elevation change at scales from outlet glaciers to the entire ice sheet, and enable global assessment of vegetation canopy height as established by ICESat. ICESat-2 is now in Phase C (Design and Development). It is scheduled to launch in 2016 on a Delta II rocket from Vandenberg Air Force Base in California. ICESat-2 will carry the Advanced Topographic Laser Altimeter System (ATLAS) and collect data to a latitudinal limit of 88 degrees. In contrast to Geoscience Laser Altimeter System (GLAS) on ICESat, ATLAS employs a 6-beam micro-pulse laser photon-counting approach. It uses a high repetition rate (10 kHz; resulting in 70 cm footprint spacing on the ground along the direction of travel) low-power laser in conjunction with single-photon sensitive detectors to measure ranges using 532 nm (green) laser light. In the polar regions, the 91-day repeat orbit pattern with a roughly monthly sub-cycle is designed to monitor seasonal and interannual variations of Greenland and Antarctic ice sheet elevations and monthly sea ice thickness changes. Dense ground-tracks over the rest of the globe achieved through a systematic sequence of off-nadir pointing (resulting in < 2 km ground-track spacing at the equator after two years) will enable measurements of land topography and vegetation canopy heights, allowing estimates of biomass and carbon in above-ground vegetation. While the ICESat-2 mission was optimized for cryospheric science, elevation measurements will be collected over land and oceans as well as histograms of backscatter from the atmosphere. These observations will provide a wealth of opportunities in addition to the primary science objectives, ranging from the retrieval of cloud properties, to river stages, to snow cover, to land

  10. Challenges in Getting Building Performance Monitoring Tools for Everyday Use: User Experiences with A New Tool

    Directory of Open Access Journals (Sweden)

    Heikki Ihasalo

    2014-05-01

    Full Text Available There is a need for building performance monitoring because it is common that buildings do not perform as intended. A number of advanced tools for the purpose have been developed within the last tens of years. However, these tools have not been widely adopted in real use. A new tool presented here utilizes building automation data and transforms the data into a set of performance metrics, and is capable of visualizing building performance from energy, indoor conditions, and HVAC (heating, ventilation and air conditioning system perspectives. The purpose of this paper is to study the users’ perceptions of the use of tool. The research method was semi-structured interviews. Although the users were satisfied with the solution in general, it was not taken into operative use. The main challenges with the use of the solution were related to accessibility, trust, and management practices. The interviewees were struggling to manage with numerous information systems and therefore had problems in finding the solution and authenticating to it. All the interviewees did not fully trust the solution, since they did not entirely understand what the performance metrics meant or because the solution had limitations in assessing building performance. Management practices are needed to support the performance measurement philosophy.

  11. Proposed Strategy for San Joaquin River Basin Water Quality Monitoring and Assessment

    Science.gov (United States)

    A Proposed Strategy for San Joaquin River Basin Water Quality Monitoring and Assessment was published in 2010, and a Strawman Proposal was developed in 2012 by the Coalition for Urban/Rural Environmental Stewardship, California Water Resources Board, EPA.

  12. Successful global assessments and monitoring: The roles of the international community and the United States

    International Nuclear Information System (INIS)

    Lund, H.G.

    1991-01-01

    Successful global assessments and monitoring of natural resources requires teamwork between participating nations and the international communities charged with the responsibility for collecting and disseminating information. In an attempt to identify emerging information needs and to promote coordination, the International Union of Forestry Research Organizations (IUFRO) and other national and international groups held a major conference and workshop in Venice, Italy, on global monitoring last September. The results of the meeting and subsequent events in Montreal indicated a need for more aggressive leadership at the international level and more cooperation at the national level. This paper reports on the outcome of the Venice conference and list some things that the international community and the United States must do to make global assessments and monitoring a reality

  13. VISUAL ART TEACHERS AND PERFORMANCE ASSESSMENT ...

    African Journals Online (AJOL)

    Charles

    qualitative research design; an aspect of descriptive survey research aiming at ... the competence and use of assessment strategies is determined by the type of ... Visual Art Teachers and Performance Assessment Methods in Nigerian Senior ...

  14. Performance-based financing as a health system reform: mapping the key dimensions for monitoring and evaluation

    Science.gov (United States)

    2013-01-01

    Background Performance-based financing is increasingly being applied in a variety of contexts, with the expectation that it can improve the performance of health systems. However, while there is a growing literature on implementation issues and effects on outputs, there has been relatively little focus on interactions between PBF and health systems and how these should be studied. This paper aims to contribute to filling that gap by developing a framework for assessing the interactions between PBF and health systems, focusing on low and middle income countries. In doing so, it elaborates a general framework for monitoring and evaluating health system reforms in general. Methods This paper is based on an exploratory literature review and on the work of a group of academics and PBF practitioners. The group developed ideas for the monitoring and evaluation framework through exchange of emails and working documents. Ideas were further refined through discussion at the Health Systems Research symposium in Beijing in October 2012, through comments from members of the online PBF Community of Practice and Beijing participants, and through discussion with PBF experts in Bergen in June 2013. Results The paper starts with a discussion of definitions, to clarify the core concept of PBF and how the different terms are used. It then develops a framework for monitoring its interactions with the health system, structured around five domains of context, the development process, design, implementation and effects. Some of the key questions for monitoring and evaluation are highlighted, and a systematic approach to monitoring effects proposed, structured according to the health system pillars, but also according to inputs, processes and outputs. Conclusions The paper lays out a broad framework within which indicators can be prioritised for monitoring and evaluation of PBF or other health system reforms. It highlights the dynamic linkages between the domains and the different pillars

  15. Performance-based financing as a health system reform: mapping the key dimensions for monitoring and evaluation.

    Science.gov (United States)

    Witter, Sophie; Toonen, Jurrien; Meessen, Bruno; Kagubare, Jean; Fritsche, György; Vaughan, Kelsey

    2013-09-29

    Performance-based financing is increasingly being applied in a variety of contexts, with the expectation that it can improve the performance of health systems. However, while there is a growing literature on implementation issues and effects on outputs, there has been relatively little focus on interactions between PBF and health systems and how these should be studied. This paper aims to contribute to filling that gap by developing a framework for assessing the interactions between PBF and health systems, focusing on low and middle income countries. In doing so, it elaborates a general framework for monitoring and evaluating health system reforms in general. This paper is based on an exploratory literature review and on the work of a group of academics and PBF practitioners. The group developed ideas for the monitoring and evaluation framework through exchange of emails and working documents. Ideas were further refined through discussion at the Health Systems Research symposium in Beijing in October 2012, through comments from members of the online PBF Community of Practice and Beijing participants, and through discussion with PBF experts in Bergen in June 2013. The paper starts with a discussion of definitions, to clarify the core concept of PBF and how the different terms are used. It then develops a framework for monitoring its interactions with the health system, structured around five domains of context, the development process, design, implementation and effects. Some of the key questions for monitoring and evaluation are highlighted, and a systematic approach to monitoring effects proposed, structured according to the health system pillars, but also according to inputs, processes and outputs. The paper lays out a broad framework within which indicators can be prioritised for monitoring and evaluation of PBF or other health system reforms. It highlights the dynamic linkages between the domains and the different pillars. All of these are also framed within

  16. On-Orbit Health Monitoring and Repair Assessment of Thermal Protection Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR project delivers On-orbit health MoNItoring and repair assessment of THERMal protection systems (OMNI_THERM). OMNI_THERM features impedance-based...

  17. From feedback- to response-based performance monitoring in active and observational learning.

    Science.gov (United States)

    Bellebaum, Christian; Colosio, Marco

    2014-09-01

    Humans can adapt their behavior by learning from the consequences of their own actions or by observing others. Gradual active learning of action-outcome contingencies is accompanied by a shift from feedback- to response-based performance monitoring. This shift is reflected by complementary learning-related changes of two ACC-driven ERP components, the feedback-related negativity (FRN) and the error-related negativity (ERN), which have both been suggested to signal events "worse than expected," that is, a negative prediction error. Although recent research has identified comparable components for observed behavior and outcomes (observational ERN and FRN), it is as yet unknown, whether these components are similarly modulated by prediction errors and thus also reflect behavioral adaptation. In this study, two groups of 15 participants learned action-outcome contingencies either actively or by observation. In active learners, FRN amplitude for negative feedback decreased and ERN amplitude in response to erroneous actions increased with learning, whereas observational ERN and FRN in observational learners did not exhibit learning-related changes. Learning performance, assessed in test trials without feedback, was comparable between groups, as was the ERN following actively performed errors during test trials. In summary, the results show that action-outcome associations can be learned similarly well actively and by observation. The mechanisms involved appear to differ, with the FRN in active learning reflecting the integration of information about own actions and the accompanying outcomes.

  18. Evaluation of performance of electronic dosimeters for individual monitoring: tests in laboratory

    International Nuclear Information System (INIS)

    Garzon, W.J.; Khoury, H.J.; Barros, V.S.M. de; Medeiros, R.B.

    2015-01-01

    Electronic dosimeters based on direct ion storage technology are being widely used in many countries for individual monitoring in many applications of ionizing radiation. However, their use as routine dosimeter has been established in a few countries due to lack of accreditation or intercomparison programs. The objective of this study is to evaluate the performance of two direct íon storage dosimeters model available in the international market: the Miriom-Instadose-1 and RADOS DIS-1 to be eventually accepted for individual monitoring in Brazil. (author)

  19. System performance of a three-phase PV-grid-connected system installed in Thailand. Data monitored analysis

    International Nuclear Information System (INIS)

    Boonmee, Chaiyant; Watjanatepin, Napat; Plangklang, Boonyang

    2009-01-01

    PV-grid-connected systems are worldwide installed because it allows consumer to reduce energy consumption from the electricity grid and to feed the surplus energy back into the grid. The system needs no battery so therefore the system price is very cheap comparing to other PV systems. PV-grid-connected systems are used in buildings that already hooked up to the electrical grid. Finding efficiency of the PV-grid-connected system can be done by using a standard instrument which needs to disconnect the PV arrays from the grid before measurement. The measurement is also difficult and we lose energy during the measurement. This paper will present the system performance of a PV-grid-connected system installed in Thailand by using a monitoring system. The monitored data are installed by acquisition software into a computer. Analysis of monitored data will be done to find out the system performance without disconnecting the PV arrays from the system. The monitored data include solar radiation, PV voltage, PV current, and PV power which has been recorded from a 5 kWp system installed of amorphous silicon PV at Rajamangala University of Technology Suvarnabhumi, Nonthaburi, Thailand. The system performance of the system by using the data monitored is compared to the standard instrument measurement. The paper will give all details about system components, monitoring system, and monitored data. The result of data analysis will be fully given. (author)

  20. Validation of performance of real-time kinematic PPP. A possible tool for deformation monitoring

    OpenAIRE

    Martín Furones, Ángel Esteban; Anquela Julián, Ana Belén; DIMAS PAGÉS, ALEJANDRO; Cos-Gayón López, Fernando José

    2015-01-01

    Structural failures (bridge or building collapses) and geohazards (landslides, ground subsi- dence or earthquakes) are worldwide problems that often lead to significant economic and loss of life. Monitoring the deformation of both natural phenomena and man-made struc- tures is a major key to assessing structural dynamic responses. Actually, this monitoring process is under real-time demand for developing warning and alert systems. One of the most used techniques for real-time deformation m...