WorldWideScience

Sample records for perform risk assessments

  1. Performing the lockout/tagout risk assessment.

    Science.gov (United States)

    Wallace, W Jon

    2007-03-01

    Lockout/tagout provides the greatest level routine, repetitive, and integral to the production process, a risk assessment should be performed. If the task performed poses an unacceptable risk, acceptable risk reduction methods should be implemented to reduce the risk to acceptable levels.

  2. Development of Integrated Assessment Technology of Risk and Performance

    International Nuclear Information System (INIS)

    Yang, Jun Eon; Kang, Dae Il; Kang, Hyun Gook

    2010-04-01

    The main idea and contents are summarized as below 1) Development of new risk/performance assessment system innovating old labor-intensive risk assessment structure - New consolidated risk assessment technology from various hazard(flood, fire, seismic in NPP) - BOP model development for performance monitoring - Consolidated risk/performance management system for consistency and efficiency of NPP 2) Resolution technology for pending issues in PSA - Base technology for PSA of digital I and C system - Base technology for seismic PSA reflecting domestic seismic characteristics and aging effect - Uncertainty reduction technology for level 2 PSA and best estimation of containment failure frequency 3) Next generation risk/performance assessment technology - Human-induced error reduction technology for efficient operation of a NPP

  3. Performance Objective for Tank Farm Closure Risk Assessments

    International Nuclear Information System (INIS)

    MANN, F.M.; KNEPP, A.J.; BADDEN, J.

    2003-01-01

    To be meaningful, results from a numeric risk assessment of the consequences of an action must be compared against the standards for such an action. That is, before one disposes of waste or closes a facility with waste, one must show that the disposal or closure action protects the public health and safety and the environment. These standards are called performance objectives. Regulations requiring performing performance assessments, (whether federal ones like the Department of Energy [DOE] Order 435.1, Radioactive Waste Management and its implementing guides or Washington State ones like the regulations implementing the Washington Administrative Code [WAC] 173-340 ''Model Toxics Control Act - Cleanup''), usually require that the determination of performance objectives be one of the first steps performed. These performance objectives not only set comparison level for the numeric results, but also define the media, pathways, exposure scenarios (receptors), spatial locations, and times that the performance assessment must consider. Thus, a performance objective consists of a compliance level, place(s) of compliance, and time(s) of compliance. Performance objectives are not the levels that a regulatory agency will enforce in a permit or authorization. Those levels, often called enforcement levels, will be set in the permit or authorization. Rather, performance objectives are those levels against which the results of the numeric simulation will be compared to judge the success of the proposed cleanup or disposal actions. Additional comparison levels may be requested for information purposes, but are not officially part of the decision on the adequacy of the proposed action. To emphasize that the performance objectives discussed in this document are not regulatory performance objectives, the three components of the performance objective will be renamed in this document as assessment standard, point(s) of assessment, and time(s) of assessment. However, whenever

  4. Performance assessment - risk assessment vive la differences

    International Nuclear Information System (INIS)

    Nitschke, R.L.

    1997-01-01

    In the sister worlds of radioactive waste management disposal and environmental restoration, there are two similar processes and computational approaches for determining the acceptability of the proposed activities. While similar, these two techniques can lead to confusion and misunderstanding if the differences are not recognized and appreciated. In the case of radioactive waste management, the performance assessment process is used to determine compliance with certain prescribed 'performance objectives'. These objectives are designed to ensure that the disposal of radioactive (high-level, low-level, and/or transuranic) waste will be protective of human health and the environment. The environmental link is primarily through assuring protection of the groundwater as a resource. In the case of environmental restoration, the risk assessment process is used to determine the proper remedial action response, if any, for a past hazardous waste release. The process compares the 'no action' or 'leave as is' option with both carcinogenic and noncarcinogenic values for human health to determine the need for any action and to help to help determine just what the appropriate action would need to be. The impacts to the ecological system are evaluated in a slightly, different but similar fashion. Now the common objectives between these two processes notwithstanding. There are some key and fundamental differences that need to be answered that make direct comparisons or a common approach inappropriate. Failure to recognize this can lead to confusion and misunderstanding. This can be particularly problematic when one is faced with an active disposal facility located within the boundaries of an environmental restoration site as is the case at the Idaho National Engineering Laboratory (INEL). Through a critical evaluation of the performance assessment and risk assessment processes, highlighting both similarities and differences, it is hoped that greater understanding and appreciation

  5. Performance of upper gastrointestinal bleeding risk assessment scores in variceal bleeding

    DEFF Research Database (Denmark)

    Ngu, JH; Laursen, Stig Borbjerg; Chin, YK

    2017-01-01

    Performance of upper gastrointestinal bleeding risk assessment scores in variceal bleeding: a prospective international multicenter study.......Performance of upper gastrointestinal bleeding risk assessment scores in variceal bleeding: a prospective international multicenter study....

  6. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  7. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  8. Historical relationship between performance assessment for radioactive waste disposal and other types of risk assessment

    International Nuclear Information System (INIS)

    Rechard, R.P.

    1999-01-01

    This article describes the evolution of the process for assessing the hazards of a geologic disposal system for radioactive waste and, similarly, nuclear power reactors, and the relationship of this process with other assessments of risk, particularly assessments of hazards from manufactured carcinogenic chemicals during use and disposal. This perspective reviews the common history of scientific concepts for risk assessment developed until the 1950s. Computational tools and techniques developed in the late 1950s and early 1960s to analyze the reliability of nuclear weapon delivery systems were adopted in the early 1970s for probabilistic risk assessment of nuclear power reactors, a technology for which behavior was unknown. In turn, these analyses became an important foundation for performance assessment of nuclear waste disposal in the late 1970s. The evaluation of risk to human health and the environment from chemical hazards is built on methods for assessing the dose response of radionuclides in the 1950s. Despite a shared background, however, societal events, often in the form of legislation, have affected the development path for risk assessment for human health, producing dissimilarities between these risk assessments and those for nuclear facilities. An important difference is the regulator's interest in accounting for uncertainty

  9. Evaluation of the performance of existing non-laboratory based cardiovascular risk assessment algorithms

    Science.gov (United States)

    2013-01-01

    Background The high burden and rising incidence of cardiovascular disease (CVD) in resource constrained countries necessitates implementation of robust and pragmatic primary and secondary prevention strategies. Many current CVD management guidelines recommend absolute cardiovascular (CV) risk assessment as a clinically sound guide to preventive and treatment strategies. Development of non-laboratory based cardiovascular risk assessment algorithms enable absolute risk assessment in resource constrained countries. The objective of this review is to evaluate the performance of existing non-laboratory based CV risk assessment algorithms using the benchmarks for clinically useful CV risk assessment algorithms outlined by Cooney and colleagues. Methods A literature search to identify non-laboratory based risk prediction algorithms was performed in MEDLINE, CINAHL, Ovid Premier Nursing Journals Plus, and PubMed databases. The identified algorithms were evaluated using the benchmarks for clinically useful cardiovascular risk assessment algorithms outlined by Cooney and colleagues. Results Five non-laboratory based CV risk assessment algorithms were identified. The Gaziano and Framingham algorithms met the criteria for appropriateness of statistical methods used to derive the algorithms and endpoints. The Swedish Consultation, Framingham and Gaziano algorithms demonstrated good discrimination in derivation datasets. Only the Gaziano algorithm was externally validated where it had optimal discrimination. The Gaziano and WHO algorithms had chart formats which made them simple and user friendly for clinical application. Conclusion Both the Gaziano and Framingham non-laboratory based algorithms met most of the criteria outlined by Cooney and colleagues. External validation of the algorithms in diverse samples is needed to ascertain their performance and applicability to different populations and to enhance clinicians’ confidence in them. PMID:24373202

  10. Performing Probabilistic Risk Assessment Through RAVEN

    Energy Technology Data Exchange (ETDEWEB)

    A. Alfonsi; C. Rabiti; D. Mandelli; J. Cogliati; R. Kinoshita

    2013-06-01

    The Reactor Analysis and Virtual control ENviroment (RAVEN) code is a software tool that acts as the control logic driver and post-processing engine for the newly developed Thermal-Hydraulic code RELAP-7. RAVEN is now a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities: Derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures), allowing on-line monitoring/controlling in the Phase Space Perform both Monte-Carlo sampling of random distributed events and Dynamic Event Tree based analysis Facilitate the input/output handling through a Graphical User Interface (GUI) and a post-processing data mining module

  11. Exposure data and risk indicators for safety performance assessment in Europe.

    NARCIS (Netherlands)

    Papadimitriou, E. Yannis, G. Bijleveld, F.D. & Cardoso, J.L.

    2013-01-01

    The objective of this paper is the analysis of the state-of-the-art in risk indicators and exposure data for safety performance assessment in Europe, in terms of data availability, collection methodologies and use. More specifically, the concepts of exposure and risk are explored, as well as the

  12. Risk Assessment of Wastewater Collection Performance Using the Fuzzy Decision-making Approach

    Directory of Open Access Journals (Sweden)

    Maedeh Asgarian

    2015-10-01

    Full Text Available Wastewater collection network simulation in normal conditions dose not provide performance assessment in unusual circumstances. In this paper, a model has been developed for risk assessment of wastewater collection systems to manage their performance under natural or man-made critical conditions. In this model, certain criteria were defined, fuzzy MADM techniques were exploited, and a questionnaire was employed to measure such risk parameters as the probability of threats, the severity of their impacts, and the vulnerability of the network components. Based on the calculated magnitude of the risks, the threats and hazards were classified into groups ranging from low-risk to high-risk threats. The approaches adopted to combat the risks were also classified into the following three categories: "to deal with the risk", "risk shifting", and "risk taking". This process was implemented for the wastewater collection system in Shahrak-Gharb District in Tehran as a case study. ‘Introduction of chemical pollutants into the sewers’ and ‘drastic changes in wastewater quality’ were identified as the most threatening crises for the district and the ‘risk reduction strategy’ was proposed for combating the critical conditions in this district.

  13. Operational risk assessments by supply chain professionals : process and performance

    NARCIS (Netherlands)

    Tazelaar, F.; Snijders, C.C.P.

    2013-01-01

    We consider the "process-performance paradox" in the assessment of operational risks by professionals in the field of operations and supply chain management (OSCM). The paradox states that although professionals with more expertise tend to decide in different ways, they often do not make better

  14. Risk-adjusted payment and performance assessment for primary care.

    Science.gov (United States)

    Ash, Arlene S; Ellis, Randall P

    2012-08-01

    Many wish to change incentives for primary care practices through bundled population-based payments and substantial performance feedback and bonus payments. Recognizing patient differences in costs and outcomes is crucial, but customized risk adjustment for such purposes is underdeveloped. Using MarketScan's claims-based data on 17.4 million commercially insured lives, we modeled bundled payment to support expected primary care activity levels (PCAL) and 9 patient outcomes for performance assessment. We evaluated models using 457,000 people assigned to 436 primary care physician panels, and among 13,000 people in a distinct multipayer medical home implementation with commercially insured, Medicare, and Medicaid patients. Each outcome is separately predicted from age, sex, and diagnoses. We define the PCAL outcome as a subset of all costs that proxies the bundled payment needed for comprehensive primary care. Other expected outcomes are used to establish targets against which actual performance can be fairly judged. We evaluate model performance using R(2)'s at patient and practice levels, and within policy-relevant subgroups. The PCAL model explains 67% of variation in its outcome, performing well across diverse patient ages, payers, plan types, and provider specialties; it explains 72% of practice-level variation. In 9 performance measures, the outcome-specific models explain 17%-86% of variation at the practice level, often substantially outperforming a generic score like the one used for full capitation payments in Medicare: for example, with grouped R(2)'s of 47% versus 5% for predicting "prescriptions for antibiotics of concern." Existing data can support the risk-adjusted bundled payment calculations and performance assessments needed to encourage desired transformations in primary care.

  15. Sensors vs. experts - a performance comparison of sensor-based fall risk assessment vs. conventional assessment in a sample of geriatric patients.

    Science.gov (United States)

    Marschollek, Michael; Rehwald, Anja; Wolf, Klaus-Hendrik; Gietzelt, Matthias; Nemitz, Gerhard; zu Schwabedissen, Hubertus Meyer; Schulze, Mareike

    2011-06-28

    Fall events contribute significantly to mortality, morbidity and costs in our ageing population. In order to identify persons at risk and to target preventive measures, many scores and assessment tools have been developed. These often require expertise and are costly to implement. Recent research investigates the use of wearable inertial sensors to provide objective data on motion features which can be used to assess individual fall risk automatically. So far it is unknown how well this new method performs in comparison with conventional fall risk assessment tools. The aim of our research is to compare the predictive performance of our new sensor-based method with conventional and established methods, based on prospective data. In a first study phase, 119 inpatients of a geriatric clinic took part in motion measurements using a wireless triaxial accelerometer during a Timed Up&Go (TUG) test and a 20 m walk. Furthermore, the St. Thomas Risk Assessment Tool in Falling Elderly Inpatients (STRATIFY) was performed, and the multidisciplinary geriatric care team estimated the patients' fall risk. In a second follow-up phase of the study, 46 of the participants were interviewed after one year, including a fall and activity assessment. The predictive performances of the TUG, the STRATIFY and team scores are compared. Furthermore, two automatically induced logistic regression models based on conventional clinical and assessment data (CONV) as well as sensor data (SENSOR) are matched. Among the risk assessment scores, the geriatric team score (sensitivity 56%, specificity 80%) outperforms STRATIFY and TUG. The induced logistic regression models CONV and SENSOR achieve similar performance values (sensitivity 68%/58%, specificity 74%/78%, AUC 0.74/0.72, +LR 2.64/2.61). Both models are able to identify more persons at risk than the simple scores. Sensor-based objective measurements of motion parameters in geriatric patients can be used to assess individual fall risk, and our

  16. Insights from Guideline for Performance of Internal Flooding Probabilistic Risk Assessment (IFPRA)

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Yang, Joo Eon

    2009-01-01

    An internal flooding (IF) risk assessment refers to the quantitative probabilistic safety assessment (PSA) treatment of flooding as a result of pipe and tank breaks inside the plants, as well as from other recognized flood sources. The industry consensus standard for Internal Events Probabilistic Risk Assessment (ASME-RA-Sb-2005) includes high-level and supporting technical requirements for developing internal flooding probabilistic risk assessment (IFPRA). This industry standard is endorsed in Regulatory Guide 1.200, Revision 1 as an acceptable approach for addressing the risk contribution from IF events for risk informed applications that require U.S. Nuclear Regulatory commission (NRC) approval. In 2006, EPRI published a draft report for IFPRA that addresses the requirements of the ASME PRA consensus standard and have made efforts to refine and update the final EPRI IFPRA guideline. Westinghouse has performed an IFPRA analysis for several nuclear power plants (NPPs), such as Watts Bar and Fort Calhoun, using the draft EPRI guidelines for development of an IFPRA. Proprietary methodologies have been developed to apply the EPRI guidelines. The objectives of the draft report for IFPRA guideline are to: · Provide guidance for PSA practitioners in the performance of the elements of a PRA associated with internal flooding events consistent with the current state of the art for internal flooding PRA · Provide guidance regarding acceptable approaches that is sufficient to meeting the requirements of the ASME PRA Standard associated with internal flooding · Incorporate lessons learned in the performance of internal flooding PRAs including those identified as pilot applications of earlier drafts of this procedures guide The purpose of this paper is to present a vision for domestic nuclear power plants' IFPRA by comparing the method of the draft EPRI guidelines with the existing IFPRA method for domestic NPPs

  17. Insights from Guideline for Performance of Internal Flooding Probabilistic Risk Assessment (IFPRA)

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Sun Yeong; Yang, Joo Eon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2009-10-15

    An internal flooding (IF) risk assessment refers to the quantitative probabilistic safety assessment (PSA) treatment of flooding as a result of pipe and tank breaks inside the plants, as well as from other recognized flood sources. The industry consensus standard for Internal Events Probabilistic Risk Assessment (ASME-RA-Sb-2005) includes high-level and supporting technical requirements for developing internal flooding probabilistic risk assessment (IFPRA). This industry standard is endorsed in Regulatory Guide 1.200, Revision 1 as an acceptable approach for addressing the risk contribution from IF events for risk informed applications that require U.S. Nuclear Regulatory commission (NRC) approval. In 2006, EPRI published a draft report for IFPRA that addresses the requirements of the ASME PRA consensus standard and have made efforts to refine and update the final EPRI IFPRA guideline. Westinghouse has performed an IFPRA analysis for several nuclear power plants (NPPs), such as Watts Bar and Fort Calhoun, using the draft EPRI guidelines for development of an IFPRA. Proprietary methodologies have been developed to apply the EPRI guidelines. The objectives of the draft report for IFPRA guideline are to: {center_dot} Provide guidance for PSA practitioners in the performance of the elements of a PRA associated with internal flooding events consistent with the current state of the art for internal flooding PRA {center_dot} Provide guidance regarding acceptable approaches that is sufficient to meeting the requirements of the ASME PRA Standard associated with internal flooding {center_dot} Incorporate lessons learned in the performance of internal flooding PRAs including those identified as pilot applications of earlier drafts of this procedures guide The purpose of this paper is to present a vision for domestic nuclear power plants' IFPRA by comparing the method of the draft EPRI guidelines with the existing IFPRA method for domestic NPPs.

  18. Dutch Risk Assessment tools

    NARCIS (Netherlands)

    Venema, A.

    2015-01-01

    The ‘Risico- Inventarisatie- en Evaluatie-instrumenten’ is the name for the Dutch risk assessment (RA) tools. A RA tool can be used to perform a risk assessment including an evaluation of the identified risks. These tools were among the first online risk assessment tools developed in Europe. The

  19. Risk Assessment

    Science.gov (United States)

    How the EPA conducts risk assessment to protect human health and the environment. Several assessments are included with the guidelines, models, databases, state-based RSL Tables, local contacts and framework documents used to perform these assessments.

  20. Gaps in Addressing Cardiovascular Risk in Rheumatoid Arthritis: Assessing Performance Using Cardiovascular Quality Indicators.

    Science.gov (United States)

    Barber, Claire E H; Esdaile, John M; Martin, Liam O; Faris, Peter; Barnabe, Cheryl; Guo, Selynne; Lopatina, Elena; Marshall, Deborah A

    2016-11-01

    Cardiovascular disease (CVD) is a major comorbidity for patients with rheumatoid arthritis (RA). This study sought to determine the performance of 11 recently developed CVD quality indicators (QI) for RA in clinical practice. Medical charts for patients with RA (early disease or biologic-treated) followed at 1 center were retrospectively reviewed. A systematic assessment of adherence to 11 QI over a 2-year period was completed. Performance on the QI was reported as a percentage pass rate. There were 170 charts reviewed (107 early disease and 63 biologic-treated). The most frequent CVD risk factors present at diagnosis (early disease) and biologic start (biologic-treated) included hypertension (26%), obesity (25%), smoking (21%), and dyslipidemia (15%). Performance on the CVD QI was highly variable. Areas of low performance (risk assessment, communication to the primary care physician (PCP) that patients with RA were at increased risk of CVD, body mass index documentation and counseling if overweight, communication to a PCP about an elevated blood pressure, and discussion of risks and benefits of antiinflammatories in patients at CVD risk. Rates of diabetes screening and lipid screening were 67% and 69%, respectively. The area of highest performance was observed for documentation of intent to taper corticosteroids (98%-100% for yrs 1 and 2, respectively). Gaps in CVD risk management were found and highlight the need for quality improvements. Key targets for improvement include coordination of CVD care between rheumatology and primary care, and communication of increased CVD risk in RA.

  1. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  2. Historical Relationship Between Performance Assessment for Radioactive Waste Disposal and Other Types of Risk Assessment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    RECHARD,ROBERT P.

    2000-07-14

    This paper describes the evolution of the process for assessing the hazards of a geologic disposal system for radioactive waste and, similarly, nuclear power reactors, and the relationship of this process with other assessments of risk, particularly assessments of hazards from manufactured carcinogenic chemicals during use and disposal. This perspective reviews the common history of scientific concepts for risk assessment developed to the 1950s. Computational tools and techniques developed in the late 1950s and early 1960s to analyze the reliability of nuclear weapon delivery systems were adopted in the early 1970s for probabilistic risk assessment of nuclear power reactors, a technology for which behavior was unknown. In turn, these analyses became an important foundation for performance assessment of nuclear waste disposal in the late 1970s. The evaluation of risk to human health and the environment from chemical hazards is built upon methods for assessing the dose response of radionuclides in the 1950s. Despite a shared background, however, societal events, often in the form of legislation, have affected the development path for risk assessment for human health, producing dissimilarities between these risk assessments and those for nuclear facilities. An important difference is the regulator's interest in accounting for uncertainty and the tools used to evaluate it.

  3. Historical Relationship Between Performance Assessment for Radioactive Waste Disposal and Other Types of Risk Assessment in the United States

    International Nuclear Information System (INIS)

    Rechard, Robert P.

    2000-01-01

    This paper describes the evolution of the process for assessing the hazards of a geologic disposal system for radioactive waste and, similarly, nuclear power reactors, and the relationship of this process with other assessments of risk, particularly assessments of hazards from manufactured carcinogenic chemicals during use and disposal. This perspective reviews the common history of scientific concepts for risk assessment developed to the 1950s. Computational tools and techniques developed in the late 1950s and early 1960s to analyze the reliability of nuclear weapon delivery systems were adopted in the early 1970s for probabilistic risk assessment of nuclear power reactors, a technology for which behavior was unknown. In turn, these analyses became an important foundation for performance assessment of nuclear waste disposal in the late 1970s. The evaluation of risk to human health and the environment from chemical hazards is built upon methods for assessing the dose response of radionuclides in the 1950s. Despite a shared background, however, societal events, often in the form of legislation, have affected the development path for risk assessment for human health, producing dissimilarities between these risk assessments and those for nuclear facilities. An important difference is the regulator's interest in accounting for uncertainty and the tools used to evaluate it

  4. Exposure data and risk indicators for safety performance assessment in Europe.

    Science.gov (United States)

    Papadimitriou, Eleonora; Yannis, George; Bijleveld, Frits; Cardoso, João L

    2013-11-01

    The objective of this paper is the analysis of the state-of-the-art in risk indicators and exposure data for safety performance assessment in Europe, in terms of data availability, collection methodologies and use. More specifically, the concepts of exposure and risk are explored, as well as the theoretical properties of various exposure measures used in road safety research (e.g. vehicle- and person-kilometres of travel, vehicle fleet, road length, driver population, time spent in traffic, etc.). Moreover, the existing methods for collecting disaggregate exposure data for risk estimates at national level are presented and assessed, including survey methods (e.g. travel surveys, traffic counts) and databases (e.g. national registers). A detailed analysis of the availability and quality of existing risk exposure data is also carried out. More specifically, the results of a questionnaire survey in the European countries are presented, with detailed information on exposure measures available, their possible disaggregations (i.e. variables and values), their conformity to standard definitions and the characteristics of their national collection methods. Finally, the potential of international risk comparisons is investigated, mainly through the International Data Files with exposure data (e.g. Eurostat, IRTAD, ECMT, UNECE, IRF, etc.). The results of this review confirm that comparing risk rates at international level may be a complex task, as the availability and quality of exposure estimates in European countries varies significantly. The lack of a common framework for the collection and exploitation of exposure data limits significantly the comparability of the national data. On the other hand, the International Data Files containing exposure data provide useful statistics and estimates in a systematic way and are currently the only sources allowing international comparisons of road safety performance under certain conditions. Copyright © 2013 Elsevier Ltd. All

  5. Modeling logistic performance in quantitative microbial risk assessment.

    Science.gov (United States)

    Rijgersberg, Hajo; Tromp, Seth; Jacxsens, Liesbeth; Uyttendaele, Mieke

    2010-01-01

    In quantitative microbial risk assessment (QMRA), food safety in the food chain is modeled and simulated. In general, prevalences, concentrations, and numbers of microorganisms in media are investigated in the different steps from farm to fork. The underlying rates and conditions (such as storage times, temperatures, gas conditions, and their distributions) are determined. However, the logistic chain with its queues (storages, shelves) and mechanisms for ordering products is usually not taken into account. As a consequence, storage times-mutually dependent in successive steps in the chain-cannot be described adequately. This may have a great impact on the tails of risk distributions. Because food safety risks are generally very small, it is crucial to model the tails of (underlying) distributions as accurately as possible. Logistic performance can be modeled by describing the underlying planning and scheduling mechanisms in discrete-event modeling. This is common practice in operations research, specifically in supply chain management. In this article, we present the application of discrete-event modeling in the context of a QMRA for Listeria monocytogenes in fresh-cut iceberg lettuce. We show the potential value of discrete-event modeling in QMRA by calculating logistic interventions (modifications in the logistic chain) and determining their significance with respect to food safety.

  6. Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey C. JOe; Ronald L. Boring

    2014-06-01

    Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

  7. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  8. Approach to modeling of human performance for purposes of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Swain, A.D.

    1983-01-01

    This paper describes the general approach taken in NUREG/CR-1278 to model human performance in sufficienct detail to permit probabilistic risk assessments of nuclear power plant operations. To show the basis for the more specific models in the above NUREG, a simplified model of the human component in man-machine systems is presented, the role of performance shaping factors is discussed, and special problems in modeling the cognitive aspect of behavior are described

  9. Operational Performance Risk Assessment in Support of A Supervisory Control System

    Energy Technology Data Exchange (ETDEWEB)

    Denning, Richard S. [Self Employed; Muhlheim, Michael David [ORNL; Cetiner, Sacit M. [ORNL; Guler Yigitoglu, Askin [ORNL

    2017-06-01

    Supervisory control system (SCS) is developed for multi-unit advanced small modular reactors to minimize human interventions in both normal and abnormal operations. In SCS, control action decisions made based on probabilistic risk assessment approach via Event Trees/Fault Trees. Although traditional PRA tools are implemented, their scope is extended to normal operations and application is reversed; success of non-safety related system instead failure of safety systems this extended PRA approach called as operational performance risk assessment (OPRA). OPRA helps to identify success paths, combination of control actions for transients and to quantify these success paths to provide possible actions without activating plant protection system. In this paper, a case study of the OPRA in supervisory control system is demonstrated within the context of the ALMR PRISM design, specifically power conversion system. The scenario investigated involved a condition that the feed water control valve is observed to be drifting to the closed position. Alternative plant configurations were identified via OPRA that would allow the plant to continue to operate at full or reduced power. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate remained safety margins. Successful recovery paths for the selected scenario are identified and quantified via SCS.

  10. Modelling tools for assessing bioremediation performance and risk of chlorinated solvents in clay tills

    DEFF Research Database (Denmark)

    Chambon, Julie Claire Claudia

    design are challenging. This thesis presents the development and application of analytical and numerical models to improve our understanding of transport and degradation processes in clay tills, which is crucial for assessing bioremediation performance and risk to groundwater. A set of modelling tools...... to groundwater and bioremediation performance in low-permeability media....

  11. HTGR accident and risk assessment

    International Nuclear Information System (INIS)

    Silady, F.A.; Everline, C.J.; Houghton, W.J.

    1982-01-01

    This paper is a synopsis of the high-temperature gas-cooled reactor probabilistic risk assessments (PRAs) performed by General Atomic Company. Principal topics presented include: HTGR safety assessments, peer interfaces, safety research, process gas explosions, quantitative safety goals, licensing applications of PRA, enhanced safety, investment risk assessments, and PRA design integration

  12. A Tutorial on Probablilistic Risk Assessement and its Role in Risk-Informed Decision Making

    Science.gov (United States)

    Dezfuli, Homayoon

    2010-01-01

    This slide presentation reviews risk assessment and its role in risk-informed decision making. It includes information on probabilistic risk assessment, typical risk management process, origins of risk matrix, performance measures, performance objectives and Bayes theorem.

  13. The issue of risk dilution in risk assessments

    International Nuclear Information System (INIS)

    Wilmot, R.; Robinson, P.

    2004-01-01

    This paper explores an issue that was first highlighted more than 20 years ago during an inquiry concerning the Sizeweli B nuclear power station in the UK. In the probabilistic safety assessment for this plant, the proponent had apparently reduced its estimates of risk by admitting to increased uncertainty about the timing of certain events. This situation is counter-intuitive, since an increase in uncertainty about the factors contributing to safety would be expected to lead to less confidence and hence to greater risk. This paradoxical situation was termed 'risk dilution' and it has been a topic of interest to reviewers of safety cases since. The recent international peer review of the Yucca Mountain performance assessments concluded that there was a potential for risk dilution in the assumptions and calculations presented. The next section describes how assumptions about the timing of events and other aspects of an assessment may lead to risk dilution, and this is followed by two examples based on recent performance assessments. The final section discusses how potential problems can be identified in safety cases, and the types of response that a regulator might adopt as a result. (authors)

  14. Verbal Instructions Acutely Affect Drop Vertical Jump Biomechanics--Implications for Athletic Performance and Injury Risk Assessments.

    Science.gov (United States)

    Khuu, Steven; Musalem, Lindsay L; Beach, Tyson A C

    2015-10-01

    Biomechanical quantities acquired during the drop vertical jump (DVJ) are used in the assessment of athletic performance and injury risk. The objective was to examine the impact of different verbal instructions on spatiotemporal, kinematic, and kinetic variables commonly included in such assessments. Ten men and 10 women from local varsity and club volleyball, basketball, figure skating, and track and field teams volunteered to participate. The athletes performed DVJs after given instructions to minimize ground contact time (CT), maximize jump height (HT), and synchronously extend the lower extremity joints (EX). Between the CT, HT, and EX conditions, body segment and joint angles were compared together with characteristics of vertical ground reaction force (GRF), whole-body power output, stiffness, and center-of-mass displacement time histories. Verbal instructions were found to influence nearly all of the spatiotemporal, body segment and joint kinematic, and kinetic variables that were statistically analyzed. Particularly noteworthy was the finding that athletic performance indices (e.g., jump height, power output, vertical stiffness, and reactive strength index) and lower extremity injury risk markers (e.g., peak vertical GRF and frontal plane knee angle) were significantly different (p ≤ 0.05) between the CT, HT, and EX conditions. The findings of this study suggest that verbal instructions should be controlled and/or clearly documented when using the DVJ to assess athletic performance potential and injury risk. Moreover, practitioners who devise performance enhancement and injury prevention strategies based on DVJ assessments are advised to consider that "coaching" or "cueing" during the task execution could impact conclusions drawn.

  15. Avalanche risk assessment in Russia

    Science.gov (United States)

    Komarov, Anton; Seliverstov, Yury; Sokratov, Sergey; Glazovskaya, Tatiana; Turchaniniva, Alla

    2017-04-01

    The avalanche prone area covers about 3 million square kilometers or 18% of total area of Russia and pose a significant problem in most mountain regions of the country. The constant growth of economic activity, especially in the North Caucasus region and therefore the increased avalanche hazard lead to the demand of the large-scale avalanche risk assessment methods development. Such methods are needed for the determination of appropriate avalanche protection measures as well as for economic assessments during all stages of spatial planning of the territory. The requirement of natural hazard risk assessments is determined by the Federal Law of Russian Federation. However, Russian Guidelines (SP 11-103-97; SP 47.13330.2012) are not clearly presented concerning avalanche risk assessment calculations. A great size of Russia territory, vast diversity of natural conditions and large variations in type and level of economic development of different regions cause significant variations in avalanche risk values. At the first stage of research the small scale avalanche risk assessment was performed in order to identify the most common patterns of risk situations and to calculate full social risk and individual risk. The full social avalanche risk for the territory of country was estimated at 91 victims. The area of territory with individual risk values lesser then 1×10(-6) covers more than 92 % of mountain areas of the country. Within these territories the safety of population can be achieved mainly by organizational activities. Approximately 7% of mountain areas have 1×10(-6) - 1×10(-4) individual risk values and require specific mitigation measures to protect people and infrastructure. Territories with individual risk values 1×10(-4) and above covers about 0,1 % of the territory and include the most severe and hazardous mountain areas. The whole specter of mitigation measures is required in order to minimize risk. The future development of such areas is not recommended

  16. Hanford Site's Integrated Risk Assessment Program: No-intervention risk assessment

    International Nuclear Information System (INIS)

    Mahaffey, J.A.; Dukelow, J.S. Jr.; Stenner, R.D.

    1994-08-01

    The long-term goal of the Integrated Risk Assessment program (IRAP) is to estimate risks to workers, the public, organizations, and groups with reserved rights to Site access, the ecosystem, and natural resources to aid in managing environmental restoration and waste management at the Hanford Site. For each of these, information is needed about current risks, risks during cleanup, and endstate risks. The objective is three-fold: to determine if and when to remediate, and to what extent; to identify information unavailable but needed to make better cleanup decisions; to establish technology performance criteria for achieving desired cleanup levels; to understand costs and benefits of activities from a Site-wide perspective. The no-intervention risk, assessment is the initial evaluation of public health risks conducted under IRAP. The objective is to identify types of activities that the US Department of Energy (DOE) must accomplish for closure of the Hanford Site, defined as no further DOE intervention. There are two primary conclusions from the no-intervention risk assessment. First, some maintenance and operations activities at Hanford must be continued to protect the public from grave risks. However, when large Hanford expenditures are compared to cleanup progress, funds expended for maintenance and operations must be put in proper perspective. Second, stakeholder's emphasis on public risks at Hanford, as indicated by remediation priorities, are not in line with those estimated. The focus currently is on compliance with regulations, and on dealing with issues which are visible to stakeholders

  17. Challenges in Risk Assessment: Quantitative Risk Assessment

    OpenAIRE

    Jacxsens, Liesbeth; Uyttendaele, Mieke; De Meulenaer, Bruno

    2016-01-01

    The process of risk analysis consists out of three components, risk assessment, risk management and risk communication. These components are internationally well spread by Codex Alimentarius Commission as being the basis for setting science based standards, criteria on food safety hazards, e.g. setting maximum limits of mycotoxins in foodstuffs. However, the technical component risk assessment is hard to elaborate and to understand. Key in a risk assessment is the translation of biological or...

  18. Building better environmental risk assessments

    Directory of Open Access Journals (Sweden)

    Raymond eLayton

    2015-08-01

    Full Text Available Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERA for genetically modified (GM crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data, and adapting advances in risk analysis from other relevant disciplines.

  19. Building Better Environmental Risk Assessments

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines. PMID:26301217

  20. Building Better Environmental Risk Assessments.

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems - examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines.

  1. Methodology for technical risk assessment

    International Nuclear Information System (INIS)

    Waganer, L.M.; Zuckerman, D.S.

    1983-01-01

    A methodology has been developed for and applied to the assessment of the technical risks associated with an evolving technology. This methodology, originally developed for fusion by K. W. Billman and F. R. Scott at EPRI, has been applied to assess the technical risk of a fuel system for a fusion reactor. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications (i.e. probability of failure). The individual steps in the technical risk assessment are summarized. The first step in this methodology is to clearly and completely quantify the technical requirements for the particular system being examined. The next step is to identify and define subsystems and various options which appear capable of achieving the required technical performance. The subsystem options are then characterized regarding subsystem functions, interface requirements with the subsystems and systems, important components, developmental obstacles and technical limitations. Key technical subsystem performance parameters are identified which directly or indirectly relate to the system technical specifications. Past, existing and future technical performance data from subsystem experts are obtained by using a Bayesian Interrogation technique. The input data is solicited in the form of probability functions. Thus the output performance of the system is expressed as probability functions

  2. Task performance fraud risk assessment on forensic accountant and auditor knowledge and mindset in Nigerian public sector

    Directory of Open Access Journals (Sweden)

    Oluwatoyin Muse Johnson Popoola

    2014-10-01

    Full Text Available This paper discusses task performance fraud risk assessment and forensic accountant and auditor knowledge and mindset in the Nigerian public sector. The aim of the study is to examine the fraud risk assessment in the Nigerian public sector through the efficient utilisation of forensic accountant and auditor knowledge and mindset. The effect will enhance the corporate governance and accountability practices among public sector accountants and auditors in Nigeria

  3. RESIDUAL RISK ASSESSMENT: ETHYLENE OXIDE ...

    Science.gov (United States)

    This document describes the residual risk assessment for the Ethylene Oxide Commercial Sterilization source category. For stationary sources, section 112 (f) of the Clean Air Act requires EPA to assess risks to human health and the environment following implementation of technology-based control standards. If these technology-based control standards do not provide an ample margin of safety, then EPA is required to promulgate addtional standards. This document describes the methodology and results of the residual risk assessment performed for the Ethylene Oxide Commercial Sterilization source category. The results of this analyiss will assist EPA in determining whether a residual risk rule for this source category is appropriate.

  4. Formulation and Presentation of Risk Assessments to Address Risk Targets for Radioactive Waste Disposal

    International Nuclear Information System (INIS)

    Wilmot, R.D.

    2002-10-01

    The Swedish regulators have been active in the field of performance assessment of radioactive waste disposal facilities for many years and have developed sophisticated approaches to the development of scenarios and other aspects of assessments. These assessments have generally used dose as the assessment end-point. Regulations recently established in Sweden (SSI FS 1998:1) have introduced a risk criterion for radioactive waste disposal: the annual risk of harmful effects after closure of a disposal facility should not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. This report evaluates different approaches to the definition and use of probabilities in the context of risk assessments, and examines the presentation of the results of risk assessments in safety cases to meet risk targets. The report illustrates the strengths and weaknesses of different possible approaches to risk assessment by reference to assessments in other countries, and provides suggestions for future activity and development in this area by the Swedish regulators. The review of experience in other countries has led to a number of key observations relevant to the conduct of regulatory work on risk assessments and preparations for review. These highlight the importance of developing a protocol for conducting calculations, and linking such a protocol to the requirements of risk assessment calculations and to existing code and model capabilities. There are a number of decisions and assumptions required in developing a risk assessment methodology that could potentially affect the calculated results. These assumptions are independent of the analysis of performance, and relate to issues such as the expectation value of risk, risk dilution, the definition of probability density functions and achieving convergence. A review of a proponent's risk assessment should address these issues in determining the appropriateness and validity of the results presented

  5. Formulation and Presentation of Risk Assessments to Address Risk Targets for Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, R.D. [Galson Sciences Ltd, Oakham (United Kingdom)

    2002-10-01

    The Swedish regulators have been active in the field of performance assessment of radioactive waste disposal facilities for many years and have developed sophisticated approaches to the development of scenarios and other aspects of assessments. These assessments have generally used dose as the assessment end-point. Regulations recently established in Sweden (SSI FS 1998:1) have introduced a risk criterion for radioactive waste disposal: the annual risk of harmful effects after closure of a disposal facility should not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk. This report evaluates different approaches to the definition and use of probabilities in the context of risk assessments, and examines the presentation of the results of risk assessments in safety cases to meet risk targets. The report illustrates the strengths and weaknesses of different possible approaches to risk assessment by reference to assessments in other countries, and provides suggestions for future activity and development in this area by the Swedish regulators. The review of experience in other countries has led to a number of key observations relevant to the conduct of regulatory work on risk assessments and preparations for review. These highlight the importance of developing a protocol for conducting calculations, and linking such a protocol to the requirements of risk assessment calculations and to existing code and model capabilities. There are a number of decisions and assumptions required in developing a risk assessment methodology that could potentially affect the calculated results. These assumptions are independent of the analysis of performance, and relate to issues such as the expectation value of risk, risk dilution, the definition of probability density functions and achieving convergence. A review of a proponent's risk assessment should address these issues in determining the appropriateness and validity of the results presented

  6. Risk assessment of forensic patients: nurses' role.

    Science.gov (United States)

    Encinares, Maxima; McMaster, Jeff James; McNamee, Jim

    2005-03-01

    One of the unique roles of forensic nurses is to conduct risk assessments. Establishing a therapeutic nurse-patient relationship helps forensic nurses perform accurate and useful risk assessments. Accurate risk assessments can facilitate formulation of individualized risk management plans, designed to meet patients' needs and ensure public safety. The importance of forensic nurses' knowledge and application of appropriate communication and proper documentation cannot be overemphasized.

  7. Modeling Logistic Performance in Quantitative Microbial Risk Assessment

    NARCIS (Netherlands)

    Rijgersberg, H.; Tromp, S.O.; Jacxsens, L.; Uyttendaele, M.

    2010-01-01

    In quantitative microbial risk assessment (QMRA), food safety in the food chain is modeled and simulated. In general, prevalences, concentrations, and numbers of microorganisms in media are investigated in the different steps from farm to fork. The underlying rates and conditions (such as storage

  8. Exploration Health Risks: Probabilistic Risk Assessment

    Science.gov (United States)

    Rhatigan, Jennifer; Charles, John; Hayes, Judith; Wren, Kiley

    2006-01-01

    conservative and nonconservative assumptions on the probability results. We discuss the methods necessary to assess mission risks once exploration mission scenarios are characterized. Preliminary efforts have produced results that are commensurate with earlier qualitative estimates of risk probabilities in this and other operational contexts, indicating that our approach may be usefully applied in support of the development of human health and performance standards for long-duration space exploration missions. This approach will also enable mission-specific probabilistic risk assessments for space exploration missions.

  9. Generalized Fragility Relationships with Local Site Conditions for Probabilistic Performance-based Seismic Risk Assessment of Bridge Inventories

    Directory of Open Access Journals (Sweden)

    Sivathayalan S.

    2012-01-01

    Full Text Available The current practice of detailed seismic risk assessment cannot be easily applied to all the bridges in a large transportation networks due to limited resources. This paper presents a new approach for seismic risk assessment of large bridge inventories in a city or national bridge network based on the framework of probabilistic performance based seismic risk assessment. To account for the influences of local site effects, a procedure to generate site-specific hazard curves that includes seismic hazard microzonation information has been developed for seismic risk assessment of bridge inventories. Simulated ground motions compatible with the site specific seismic hazard are used as input excitations in nonlinear time history analysis of representative bridges for calibration. A normalizing procedure to obtain generalized fragility relationships in terms of structural characteristic parameters of bridge span and size and longitudinal and transverse reinforcement ratios is presented. The seismic risk of bridges in a large inventory can then be easily evaluated using the normalized fragility relationships without the requirement of carrying out detailed nonlinear time history analysis.

  10. Regional scale ecological risk assessment: using the relative risk model

    National Research Council Canada - National Science Library

    Landis, Wayne G

    2005-01-01

    ...) in the performance of regional-scale ecological risk assessments. The initial chapters present the methodology and the critical nature of the interaction between risk assessors and decision makers...

  11. Analysis of Alternatives for Risk Assessment Methodologies and Tools

    Energy Technology Data Exchange (ETDEWEB)

    Nachtigal, Noel M. [Sandia National Lab. (SNL-CA), Livermore, CA (United States). System Analytics; Fruetel, Julia A. [Sandia National Lab. (SNL-CA), Livermore, CA (United States). Systems Research and Analysis; Gleason, Nathaniel J. [Sandia National Lab. (SNL-CA), Livermore, CA (United States). Systems Research and Analysis; Helms, Jovana [Sandia National Lab. (SNL-CA), Livermore, CA (United States). Systems Research and Analysis; Imbro, Dennis Raymond [Sandia National Lab. (SNL-CA), Livermore, CA (United States). Systems Research and Analysis; Sumner, Matthew C. [Sandia National Lab. (SNL-CA), Livermore, CA (United States). Systems Research and Analysis

    2013-10-01

    The purpose of this document is to provide a basic overview and understanding of risk assessment methodologies and tools from the literature and to assess the suitability of these methodologies and tools for cyber risk assessment. Sandia National Laboratories (SNL) performed this review in support of risk modeling activities performed for the Stakeholder Engagement and Cyber Infrastructure Resilience (SECIR) division of the Department of Homeland Security (DHS) Office of Cybersecurity and Communications (CS&C). The set of methodologies and tools covered in this document is not intended to be exhaustive; instead, it focuses on those that are commonly used in the risk assessment community. The classification of methodologies and tools was performed by a group of analysts with experience in risk analysis and cybersecurity, and the resulting analysis of alternatives has been tailored to address the needs of a cyber risk assessment.

  12. Impact of shutdown risk on risk-based assessment of technical specifications

    International Nuclear Information System (INIS)

    Deriot, S.

    1992-10-01

    This paper describes the current work performed by the Research and Development Division of EDF concerning risk-based assessment of Operating Technical Specifications (OTS). The current risk-based assessment of OTS at EDF is presented. Then, the level 1 Probabilistic Safety Assessment of unit 3 of the Paluel nuclear power station (called PSA 1300) is described. It is fully computerized and takes into account the risk in shutdown states. A case study is presented. It shows that the fact of considering shutdown risk suggests that the current OTS should be modified

  13. Hanford Site baseline risk assessment methodology

    International Nuclear Information System (INIS)

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site

  14. Recovery in environmental risk assessment at EFSA

    NARCIS (Netherlands)

    Brock, T.C.M.

    2016-01-01

    EFSA performs environmental risk assessments (ERAs) for single potential stressors such as plant protection products, genetically modified organisms and feed additives and for invasive alien species that are harmful for plant health. In this risk assessment domain, the EFSA Scientific Committee

  15. Quantitative risk assessment system (QRAS)

    Science.gov (United States)

    Weinstock, Robert M (Inventor); Smidts, Carol S (Inventor); Mosleh, Ali (Inventor); Chang, Yung-Hsien (Inventor); Swaminathan, Sankaran (Inventor); Groen, Francisco J (Inventor); Tan, Zhibin (Inventor)

    2001-01-01

    A quantitative risk assessment system (QRAS) builds a risk model of a system for which risk of failure is being assessed, then analyzes the risk of the system corresponding to the risk model. The QRAS performs sensitivity analysis of the risk model by altering fundamental components and quantifications built into the risk model, then re-analyzes the risk of the system using the modifications. More particularly, the risk model is built by building a hierarchy, creating a mission timeline, quantifying failure modes, and building/editing event sequence diagrams. Multiplicities, dependencies, and redundancies of the system are included in the risk model. For analysis runs, a fixed baseline is first constructed and stored. This baseline contains the lowest level scenarios, preserved in event tree structure. The analysis runs, at any level of the hierarchy and below, access this baseline for risk quantitative computation as well as ranking of particular risks. A standalone Tool Box capability exists, allowing the user to store application programs within QRAS.

  16. Approach and strategy for performing ecological risk assessments for the U.S. Department of Energy's Oak Ridge Reservation: 1994 revision

    International Nuclear Information System (INIS)

    Suter, G.W. II; Sample, B.E.; Jones, D.S.; Ashwood, T.L.

    1994-08-01

    This report provides guidance for planning and performing ecological risk assessments on the Oak Ridge Reservation (ORR). The tiered approach to ecological risk assessment has been implemented, generic conceptual models have been developed, and a general approach for developing ecological assessment endpoints and measurement endpoints has been agreed upon. The document also includes changes in terminology to agree with the terminology in the US Environmental Protection Agency's (EPA's) framework for ecological risk assessment. Although ecological risks are equal in regulatory importance to human health risks, formal procedures for ecological risk assessment are poorly developed. This report will provide specific guidance and promote the use of consistent approaches for ecological risk assessments at individual sites on the ORR. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance and with relevant EPA guidance. The general approach and strategy presented herein was developed for the ORR, but it should be applicable to other complex CERCLA sites that possess significant ecological resources

  17. A total risk assessment methodology for security assessment

    International Nuclear Information System (INIS)

    Auilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-01-01

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a

  18. Hanford waste vitrification systems risk assessment

    International Nuclear Information System (INIS)

    Miller, W.C.; Hamilton, D.W.; Holton, L.K.; Bailey, J.W.

    1991-09-01

    A systematic Risk Assessment was performed to identify the technical, regulatory, and programmatic uncertainties and to quantify the risks to the Hanford Site double-shell tank waste vitrification program baseline (as defined in December 1990). Mitigating strategies to reduce the overall program risk were proposed. All major program elements were evaluated, including double-shell tank waste characterization, Tank Farms, retrieval, pretreatment, vitrification, and grouting. Computer-based techniques were used to quantify risks to proceeding with construction of the Hanford Waste Vitrification Plant on the present baseline schedule. Risks to the potential vitrification of single-shell tank wastes and cesium and strontium capsules were also assessed. 62 refs., 38 figs., 26 tabs

  19. Risk assessment of student performance in the International Foundations of Medicine Clinical Science Examination by the use of statistical modeling

    Directory of Open Access Journals (Sweden)

    David MC

    2016-12-01

    Full Text Available Michael C David,1 Diann S Eley,2 Jennifer Schafer,2 Leo Davies,3 1School of Public Health, 2School of Medicine, The University of Queensland, Herston, QLD, 3Sydney Medical School, The University of Sydney, NSW, Australia Purpose: The primary aim of this study was to assess the predictive validity of cumulative grade point average (GPA for performance in the International Foundations of Medicine (IFOM Clinical Science Examination (CSE. A secondary aim was to develop a strategy for identifying students at risk of performing poorly in the IFOM CSE as determined by the National Board of Medical Examiners’ International Standard of Competence. Methods: Final year medical students from an Australian university medical school took the IFOM CSE as a formative assessment. Measures included overall IFOM CSE score as the dependent variable, cumulative GPA as the predictor, and the factors age, gender, year of enrollment, international or domestic status of student, and language spoken at home as covariates. Multivariable linear regression was used to measure predictor and covariate effects. Optimal thresholds of risk assessment were based on receiver-operating characteristic (ROC curves. Results: Cumulative GPA (nonstandardized regression coefficient [B]: 81.83; 95% confidence interval [CI]: 68.13 to 95.53 and international status (B: –37.40; 95% CI: –57.85 to –16.96 from 427 students were found to be statistically associated with increased IFOM CSE ­performance. Cumulative GPAs of 5.30 (area under ROC [AROC]: 0.77; 95% CI: 0.72 to 0.82 and 4.90 (AROC: 0.72; 95% CI: 0.66 to 0.78 were identified as being thresholds of significant risk for domestic and international students, respectively. Conclusion: Using cumulative GPA as a predictor of IFOM CSE performance and accommodating for differences in international status, it is possible to identify students who are at risk of failing to satisfy the National Board of Medical Examiners’ International

  20. Approach and strategy for performing ecological risk assessments for the U.S. Department of Energy`s Oak Ridge Reservation: 1994 revision

    Energy Technology Data Exchange (ETDEWEB)

    Suter, G.W. II; Sample, B.E.; Jones, D.S.; Ashwood, T.L.

    1994-08-01

    This report provides guidance for planning and performing ecological risk assessments on the Oak Ridge Reservation (ORR). The tiered approach to ecological risk assessment has been implemented, generic conceptual models have been developed, and a general approach for developing ecological assessment endpoints and measurement endpoints has been agreed upon. The document also includes changes in terminology to agree with the terminology in the US Environmental Protection Agency`s (EPA`s) framework for ecological risk assessment. Although ecological risks are equal in regulatory importance to human health risks, formal procedures for ecological risk assessment are poorly developed. This report will provide specific guidance and promote the use of consistent approaches for ecological risk assessments at individual sites on the ORR. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance and with relevant EPA guidance. The general approach and strategy presented herein was developed for the ORR, but it should be applicable to other complex CERCLA sites that possess significant ecological resources.

  1. Need to use probabilistic risk approach in performance assessment of waste disposal facilities

    International Nuclear Information System (INIS)

    Bonano, E.J.; Gallegos, D.P.

    1991-01-01

    Regulations governing the disposal of radioactive, hazardous, and/or mixed wastes will likely require, either directly or indirectly, that the performance of disposal facilities be assessed quantitatively. Such analyses, commonly called ''performance assessments,'' rely on the use of predictive models to arrive at a quantitative estimate of the potential impact of disposal on the environment and the safety and health of the public. It has been recognized that a suite of uncertainties affect the results of a performance assessment. These uncertainties are conventionally categorized as (1) uncertainty in the future state of the disposal system (facility and surrounding medium), (2) uncertainty in models (including conceptual models, mathematical models, and computer codes), and (3) uncertainty in data and parameters. Decisions regarding the suitability of a waste disposal facility must be made in light of these uncertainties. Hence, an approach is needed that would allow the explicit consideration of these uncertainties so that their impact on the estimated consequences of disposal can be evaluated. While most regulations for waste disposal do not prescribe the consideration of uncertainties, it is proposed that, even in such cases, a meaningful decision regarding the suitability of a waste disposal facility cannot be made without considering the impact of the attendant uncertainties. A probabilistic risk assessment (PRA) approach provides the formalism for considering the uncertainties and the technical basis that the decision makers can use in discharging their duties. A PRA methodology developed and demonstrated for the disposal of high-level radioactive waste provides a general framework for assessing the disposal of all types of wastes (radioactive, hazardous, and mixed). 15 refs., 1 fig., 1 tab

  2. New approaches for improving cardiovascular risk assessment.

    Science.gov (United States)

    Paredes, Simão; Rocha, Teresa; Mendes, Diana; Carvalho, Paulo; Henriques, Jorge; Morais, João; Ferreira, Jorge; Mendes, Miguel

    2016-01-01

    Clinical guidelines recommend the use of cardiovascular risk assessment tools (risk scores) to predict the risk of events such as cardiovascular death, since these scores can aid clinical decision-making and thereby reduce the social and economic costs of cardiovascular disease (CVD). However, despite their importance, risk scores present important weaknesses that can diminish their reliability in clinical contexts. This study presents a new framework, based on current risk assessment tools, that aims to minimize these limitations. Appropriate application and combination of existing knowledge is the main focus of this work. Two different methodologies are applied: (i) a combination scheme that enables data to be extracted and processed from various sources of information, including current risk assessment tools and the contributions of the physician; and (ii) a personalization scheme based on the creation of patient groups with the purpose of identifying the most suitable risk assessment tool to assess the risk of a specific patient. Validation was performed based on a real patient dataset of 460 patients at Santa Cruz Hospital, Lisbon, Portugal, diagnosed with non-ST-segment elevation acute coronary syndrome. Promising results were obtained with both approaches, which achieved sensitivity, specificity and geometric mean of 78.79%, 73.07% and 75.87%, and 75.69%, 69.79% and 72.71%, respectively. The proposed approaches present better performances than current CVD risk scores; however, additional datasets are required to back up these findings. Copyright © 2015 Sociedade Portuguesa de Cardiologia. Published by Elsevier España. All rights reserved.

  3. Risk assessment

    International Nuclear Information System (INIS)

    Kinchin, G.H.

    1983-01-01

    After defining risk and introducing the concept of individual and societal risk, the author considers each of these, restricting considerations to risk of death. Some probabilities of death arising from various causes are quoted, and attention drawn to the care necessary in making comparisons between sets of data and to the distinction between voluntary and involuntary categories and between early and delayed deaths. The presentation of information on societal risk is discussed and examples given. The history of quantified risk assessment is outlined, particularly related to the nuclear industry, the process of assessing risk discussed: identification of hazard causes, the development of accident chains and the use of event trees, the evaluation of probability through the collection of data and their use with fault trees, and the assessment of consequences of hazards in terms of fatalities. Reference is made to the human element and common-made failures, and to studies supporting the development of reliability assessment techniques. Acceptance criteria are discussed for individual and societal risk in the nuclear field, and it is shown that proposed criteria lead to risks conservative by comparison with risks from day-to-day accidents and other potentially hazardous industries. (U.K.)

  4. Risk Assessment Overview

    Science.gov (United States)

    Prassinos, Peter G.; Lyver, John W., IV; Bui, Chinh T.

    2011-01-01

    Risk assessment is used in many industries to identify and manage risks. Initially developed for use on aeronautical and nuclear systems, risk assessment has been applied to transportation, chemical, computer, financial, and security systems among others. It is used to gain an understanding of the weaknesses or vulnerabilities in a system so modification can be made to increase operability, efficiency, and safety and to reduce failure and down-time. Risk assessment results are primary inputs to risk-informed decision making; where risk information including uncertainty is used along with other pertinent information to assist management in the decision-making process. Therefore, to be useful, a risk assessment must be directed at specific objectives. As the world embraces the globalization of trade and manufacturing, understanding the associated risk become important to decision making. Applying risk assessment techniques to a global system of development, manufacturing, and transportation can provide insight into how the system can fail, the likelihood of system failure and the consequences of system failure. The risk assessment can identify those elements that contribute most to risk and identify measures to prevent and mitigate failures, disruptions, and damaging outcomes. In addition, risk associated with public and environment impact can be identified. The risk insights gained can be applied to making decisions concerning suitable development and manufacturing locations, supply chains, and transportation strategies. While risk assessment has been mostly applied to mechanical and electrical systems, the concepts and techniques can be applied across other systems and activities. This paper provides a basic overview of the development of a risk assessment.

  5. Scenario sensitivity analyses performed on the PRESTO-EPA LLW risk assessment models

    International Nuclear Information System (INIS)

    Bandrowski, M.S.

    1988-01-01

    The US Environmental Protection Agency (EPA) is currently developing standards for the land disposal of low-level radioactive waste. As part of the standard development, EPA has performed risk assessments using the PRESTO-EPA codes. A program of sensitivity analysis was conducted on the PRESTO-EPA codes, consisting of single parameter sensitivity analysis and scenario sensitivity analysis. The results of the single parameter sensitivity analysis were discussed at the 1987 DOE LLW Management Conference. Specific scenario sensitivity analyses have been completed and evaluated. Scenario assumptions that were analyzed include: site location, disposal method, form of waste, waste volume, analysis time horizon, critical radionuclides, use of buffer zones, and global health effects

  6. Introduction to risk assessment

    International Nuclear Information System (INIS)

    Raina, V.M.

    2002-01-01

    This paper gives an introduction to risk assessment. It discusses the basic concepts of risk assessment, nuclear risk assessment process and products, the role of risk assessment products in nuclear safety assurance, the relationship between risk assessment and other safety analysis and risk assessment and safe operating envelope

  7. Cumulative Risk Assessment (CRA): transforming the way we assess health risks.

    Science.gov (United States)

    Williams, Pamela R D; Dotson, G Scott; Maier, Andrew

    2012-10-16

    Human health risk assessments continue to evolve and now focus on the need for cumulative risk assessment (CRA). CRA involves assessing the combined risk from coexposure to multiple chemical and nonchemical stressors for varying health effects. CRAs are broader in scope than traditional chemical risk assessments because they allow for a more comprehensive evaluation of the interaction between different stressors and their combined impact on human health. Future directions of CRA include greater emphasis on local-level community-based assessments; integrating environmental, occupational, community, and individual risk factors; and identifying and implementing common frameworks and risk metrics for incorporating multiple stressors.

  8. PRECIS -- A probabilistic risk assessment system

    International Nuclear Information System (INIS)

    Peterson, D.M.; Knowlton, R.G. Jr.

    1996-01-01

    A series of computer tools has been developed to conduct the exposure assessment and risk characterization phases of human health risk assessments within a probabilistic framework. The tools are collectively referred to as the Probabilistic Risk Evaluation and Characterization Investigation System (PRECIS). With this system, a risk assessor can calculate the doses and risks associated with multiple environmental and exposure pathways, for both chemicals and radioactive contaminants. Exposure assessment models in the system account for transport of contaminants to receptor points from a source zone originating in unsaturated soils above the water table. In addition to performing calculations of dose and risk based on initial concentrations, PRECIS can also be used in an inverse manner to compute soil concentrations in the source area that must not be exceeded if prescribed limits on dose or risk are to be met. Such soil contaminant levels, referred to as soil guidelines, are computed for both single contaminants and chemical mixtures and can be used as action levels or cleanup levels. Probabilistic estimates of risk, dose and soil guidelines are derived using Monte Carlo techniques

  9. Risk assessment of soil contamination criteria

    International Nuclear Information System (INIS)

    King, C.M.; Marter, W.L.; Montaque, D.F.; Holton, G.A.

    1987-06-01

    Criteria have been developed to select radioactive and nonradioactive contaminants at waste sites detailed analysis and risk assessment. These criteria were based on soil and water quality guidelines developed by various government agencies to determine if the criteria were appropriate. We performed a risk assessment of a hypothetical site which contained radioactive and nonradioactive contaminants at levels equal to the criteria values. Risks to the public from atmospheric, surface water, and groundwater exposure pathways were examined. Health risks to the public from atmospheric releases of radioactive and nonradioactive materials from a waste at soil criteria contamination levels are low. Health risks to the maximally exposed individual to chemical carcinogens are considerably below traditional EPA action levels. And health risks to the maximally exposed individual to atmospherically released radioactive contaminants is 1.88 x 10 -7 , more than a factor of 5 less than 10 -6 . Based on our atmospheric exposure pathways analysis and risk assessment, the applied soil criteria are appropriate for screening out unimportant risk contributors to human health from atmospheric exposure pathways. 13 refs., 3 figs., 7 tabs

  10. Development of a system utilizing data of risk assessment

    International Nuclear Information System (INIS)

    Nagasaka, Akihiko; Takano, Kenichi; Ebisu, Mitsuhiro; Aikawa, Tadashi; Hayase, Kenichi

    2004-01-01

    This report deals with a concrete method of utilizing data of risk assessment. First, the authors point out the necessity to assess all stages of jobs (planning, meeting with contractors, performing phase of task, etc.) in risk assessment bout jobs in electric power company, because most jobs are performed by contract system and risks of a job are distributed over electric company, contractors and subcontractors. Secondly, risks estimated from past accidents and near-miss events must be included. If these 2 requirements are fulfilled, data of risk assessment can be more useful. Then below 4 forms of present data of risk assessment were developed. A form to be used in job planning stage in electric companies for efficient investment planning in safety measures. A form to be used in meetings between electric companies and contractors for checking accident prevention methods. A form to be used in meetings between contractors and subcontractors for enhancing a shared awareness of risk. A form to be used in tool box meetings for confirming safe condition and inheriting of ability of risk perception. Additionally, a data base system of risk assessment about 4 jobs was developed. This system prints out about 4 forms for each job and is useful for PDCA of safety activities. (author)

  11. Credit Risk and Financial Performance Assessment of Illinois Farmers: A Comparison of Approaches with Farm Accounting Data

    OpenAIRE

    Zhang, Tianwei; Ellinger, Paul N.

    2006-01-01

    Pro forma financial performance evaluation of agricultural producers is an important issue for lenders, internal management and policy makers. Lenders strive to improve their credit risk management. Internal management is interested in understanding the financial impacts of alternative strategic decisions. And policy makers often assess the magnitude and distributional effects of alternative policies on the future financial performance of farm business. Data limitations are a major impediment...

  12. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2000-01-01

    The Nevada Risk Assessment/Management Program (NRAMP) is part of a national effort by the U.S. Department of Energy (DOE) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the NRAMP project and presents a synopsis of the NRAMP effort which occurred from 1995 to 2000. The primary goals of the DOE in awarding the cooperative agreement establishing NRAMP were to (I) use a risk-based approach to evaluate the consequences of alternative actions in DOE's Environmental Remediation Programs at sites in Nevada and (2) use a neutral and credible institution outside the DOE to perform the risk assessments and contribute to public education about environmental management issues at the Nevada Test Site. (author)

  13. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  14. An integrated framework for health and ecological risk assessment

    International Nuclear Information System (INIS)

    Suter, Glenn W.; Vermeire, Theo; Munns, Wayne R.; Sekizawa, Jun

    2005-01-01

    The worldHealth Organization's (WHO's) International Program for Chemical Safety has developed a framework for performing risk assessments that integrate the assessment of risks to human health and risks to nonhuman organisms and ecosystems. The WHO's framework recognizes that stakeholders and risk managers have their own processes that are parallel to the scientific process of risk assessment and may interact with the risk assessment at various points, depending on the context. Integration of health and ecology provides consistent expressions of assessment results, incorporates the interdependence of humans and the environment, uses sentinel organisms, and improves the efficiency and quality of assessments relative to independent human health and ecological risk assessments. The advantage of the framework to toxicologists lies in the opportunity to use understanding of toxicokinetics and toxicodynamics to inform the integrated assessment of all exposed species

  15. Aspects of human performance as perceived by the members of a joint probabilistic risk assessment working group

    International Nuclear Information System (INIS)

    Gubler, R.; Chakraborty, S.

    1987-01-01

    For the purpose of refining the basis for emergency planning a partial probabilistic risk assessment has been carried out for a large Swiss pressurized water reactor of German design. During the investigations on system reliability it became apparent that the most sensitive and also the most important subject to deal with in the working group was the quantification of the performance of the plant personnel. The discussions showed clearly, that different and sometimes antagonistic aspects of viewing the performance of the plant personnel exist. However, because of the limited data base in the field considered, impartiality is difficult. In order to handle these difficulties the analysis was carried out with close reliance on previously performed and accessible studies for similar tasks and situations in nuclear power plants. The procedure is illustrated by two examples, the first assessing the reliability of calibrating an instrument channel of the reactor protection systems, the second assessing the performance of operators during a small loss of coolant accident. (author)

  16. Assessing Risk-Based Performance Indicators in Safety-Critical Systems for Nuclear Power Plants

    OpenAIRE

    TONT Gabriela

    2011-01-01

    The paper proposes framework for a multidisciplinary nuclear risk and safety assessment by modeling uncertainty and combining diverse evidence provided in such a way that it could be used to represent an entire argument about a system's dependability. The identified safety issues are being treated by means of probabilistic safety assessment (PSA). The behavior simulation of power plant in thepresence of risk factors is analyzed from the vulnerability, risk and functional safety viewpoints, hi...

  17. Operational risk assessment.

    Science.gov (United States)

    McKim, Vicky L

    2017-06-01

    In the world of risk management, which encompasses the business continuity disciplines, many types of risk require evaluation. Financial risk is most often the primary focus, followed by product and market risks. Another critical area, which typically lacks a thorough review or may be overlooked, is operational risk. This category encompasses many risk exposure types including those around building structures and systems, environmental issues, nature, neighbours, clients, regulatory compliance, network, data security and so on. At times, insurance carriers will assess internal hazards, but seldom do these assessments include more than a cursory look at other types of operational risk. In heavily regulated environments, risk assessments are required but may not always include thorough assessments of operational exposures. Vulnerabilities may linger or go unnoticed, only to become the catalyst for a business disruption at a later time, some of which are so severe that business recovery becomes nearly impossible. Businesses may suffer loss of clients as the result of a prolonged disruption of services. Comprehensive operational risk assessments can assist in identifying such vulnerabilities, exposures and threats so that the risk can be minimised or removed. This paper lays out how an assessment of this type can be successfully conducted.

  18. Hanford Site Risk Assessment Methodology. Revision 3

    International Nuclear Information System (INIS)

    1995-05-01

    This methodology has been developed to prepare human health and ecological evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigations (RI) and the Resource conservation and Recovery Act of 1976 (RCRA) facility investigations (FI) performed at the Hanford Site pursuant to the hanford Federal Facility Agreement and Consent Order (Ecology et al. 1994), referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies site-specific risk assessment considerations and integrates them with approaches for evaluating human and ecological risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site

  19. NASA Human System Risk Assessment Process

    Science.gov (United States)

    Francisco, D.; Romero, E.

    2016-01-01

    NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary

  20. Engineering aspects of probabilistic risk assessment

    International Nuclear Information System (INIS)

    vonHerrmann, J.L.; Wood, P.J.

    1984-01-01

    Over the last decade, the use of probabilistic risk assessment (PRA) in the nuclear industry has expanded significantly. In these analyses the probabilities of experiencing certain undesired events (for example, a plant accident which results in damage to the nuclear fuel) are estimated and the consequences of these events are evaluated in terms of some common measure. These probabilities and consequences are then combined to form a representation of the risk associated with the plant studied. In the relatively short history of probabilistic risk assessment of nuclear power plants, the primary motivation for these studies has been the quantitative assessment of public risk associated with a single plant or group of plants. Accordingly, the primary product of most PRAs performed to date has been a 'risk curve' in which the probability (or expected frequency) of exceeding a certain consequence level is plotted against that consequence. The most common goal of these assessments has been to demonstrate the 'acceptability' of the calculated risk by comparison of the resultant risk curve to risk curves associated with other plants or with other societal risks. Presented here are brief descriptions of some alternate applications of PRAs, a discussion of how these other applications compare or contrast with the currently popular uses of PRA, and a discussion of the relative benefits of each

  1. A Successful ED Fall Risk Program Using the KINDER 1 Fall RiskAssessment Tool.

    Science.gov (United States)

    Townsend, Ann B; Valle-Ortiz, Marisol; Sansweet, Tracy

    2016-11-01

    Emergency nurses did not perform falls risk assessments routinely on our ED patients; the instrument used was aimed at inpatients. We identified a need to revise fall assessment practices specific to our emergency department. The purpose of the performance improvement project was to reduce ED falls and evaluate the use of an ED-specific fall risk tool, the KINDER 1 Fall Risk Assessment. The plan was to establish fall risk assessment practices at point of ED entry and to decrease total falls. We retrospectively reviewed ED fall data for each quarter of 2013, which included risk assessments scores, the total number of falls, and the circumstances of each fall. Using Kotter's framework to guide a successful change process, we implemented the KINDER 1 to assess fall risk. During the first 4 weeks of the project, 937 patients (27%) were identified as high risk for falls using the KINDER 1. During the subsequent 3 quarters, the total number of falls decreased; reported falls without injuries dropped from 0.21 to 0.07 per 1000 patients, and falls with injuries were reduced from 0.21 to 0.0 per 1000 patients. The results of this project represented a valuable step toward achieving our goal to keep ED patients safe from injuries as a result of falls. The findings add to the body of nursing knowledge on the application of clinical-based performance improvement projects to improve patient outcomes and to provide data on the use of the KINDER 1 tool, which has not been extensively tested. Copyright © 2016 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  2. Cardiovascular Risk Factors among College Students: Knowledge, Perception, and Risk Assessment

    Science.gov (United States)

    Tran, Dieu-My T.; Zimmerman, Lani M.; Kupzyk, Kevin A.; Shurmur, Scott W.; Pullen, Carol H.; Yates, Bernice C.

    2017-01-01

    Objective: To assess college students' knowledge and perception of cardiovascular risk factors and to screen for their cardiovascular risks. Participants: The final sample that responded to recruitment consisted of 158 college students from a midwestern university. Methods: A cross-sectional, descriptive study was performed using convenience…

  3. Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

    Science.gov (United States)

    Frigm, Ryan C.; Levi, Joshua A.; Mantziaras, Dimitrios C.

    2010-01-01

    An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

  4. Risk assessment handbook

    International Nuclear Information System (INIS)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG ampersand G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established

  5. Fracture risk assessed by Fracture Risk Assessment Tool (FRAX) compared with fracture risk derived from population fracture rates

    DEFF Research Database (Denmark)

    Rubin, Katrine Hass; Abrahamsen, Bo; Hermann, Anne Pernille

    2011-01-01

    Purpose: To evaluate the performance of the Swedish version of Fracture Risk Assessment Tool (FRAX)) without bone mass density (BMD) in a Danish population to examine the possibility of applying this version to Danish women. METHODS: From the Danish National Register of social security numbers, we...

  6. High-performance broad-band spectroscopy for breast cancer risk assessment

    Science.gov (United States)

    Pawluczyk, Olga; Blackmore, Kristina; Dick, Samantha; Lilge, Lothar

    2005-09-01

    Medical diagnostics and screening are becoming increasingly demanding applications for spectroscopy. Although for many years the demand was satisfied with traditional spectrometers, analysis of complex biological samples has created a need for instruments capable of detecting small differences between samples. One such application is the measurement of absorbance of broad spectrum illumination by breast tissue, in order to quantify the breast tissue density. Studies have shown that breast cancer risk is closely associated with the measurement of radiographic breast density measurement. Using signal attenuation in transillumination spectroscopy in the 550-1100nm spectral range to measure breast density, has the potential to reduce the frequency of ionizing radiation, or making the test accessible to younger women; lower the cost and make the procedure more comfortable for the patient. In order to determine breast density, small spectral variances over a total attenuation of up to 8 OD have to be detected with the spectrophotometer. For this, a high performance system has been developed. The system uses Volume Phase Holographic (VPH) transmission grating, a 2D detector array for simultaneous registration of the whole spectrum with high signal to noise ratio, dedicated optical system specifically optimized for spectroscopic applications and many other improvements. The signal to noise ratio exceeding 50,000 for a single data acquisition eliminates the need for nitrogen cooled detectors and provides sufficient information to predict breast tissue density. Current studies employing transillumination breast spectroscopy (TIBS) relating to breast cancer risk assessment and monitoring are described.

  7. Hepatitis Risk Assessment

    Science.gov (United States)

    ... please visit this page: About CDC.gov . Hepatitis Risk Assessment Recommend on Facebook Tweet Share Compartir Viral Hepatitis. Are you at risk? Take this 5 minute Hepatitis Risk Assessment developed ...

  8. Risk assessment of safety violations for coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Megan Orsulaka; Vladislav Kecojevicb; Larry Graysona; Antonio Nietoa [Pennsylvania State University, University Park, PA (United States). Dept of Energy and Mineral Engineering

    2010-09-15

    This article presents an application of a risk assessment approach in characterising the risks associated with safety violations in underground bituminous mines in Pennsylvania using the Mine Safety and Health Administration (MSHA) citation database. The MSHA database on citations provides an opportunity to assess risks in mines through scrutiny of violations of mandatory safety standards. In this study, quantitative risk assessment is performed, which allows determination of the frequency of occurrence of safety violations (through associated citations) as well as the consequences of them in terms of penalty assessments. Focus is on establishing risk matrices on citation experiences of mines, which can give early indication of emerging potentially serious problems. The resulting frequency, consequence and risk rankings present valuable tools for prioritising resource allocations, determining control strategies, and could potentially contribute to more proactive prevention of incidents and injuries.

  9. Hanford Site baseline risk assessment methodology. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site.

  10. GM Risk Assessment

    Science.gov (United States)

    Sparrow, Penny A. C.

    GM risk assessments play an important role in the decision-making process surrounding the regulation, notification and permission to handle Genetically Modified Organisms (GMOs). Ultimately the role of a GM risk assessment will be to ensure the safe handling and containment of the GMO; and to assess any potential impacts on the environment and human health. A risk assessment should answer all ‘what if’ scenarios, based on scientific evidence.

  11. Risk assessment model for development of advanced age-related macular degeneration.

    Science.gov (United States)

    Klein, Michael L; Francis, Peter J; Ferris, Frederick L; Hamon, Sara C; Clemons, Traci E

    2011-12-01

    To design a risk assessment model for development of advanced age-related macular degeneration (AMD) incorporating phenotypic, demographic, environmental, and genetic risk factors. We evaluated longitudinal data from 2846 participants in the Age-Related Eye Disease Study. At baseline, these individuals had all levels of AMD, ranging from none to unilateral advanced AMD (neovascular or geographic atrophy). Follow-up averaged 9.3 years. We performed a Cox proportional hazards analysis with demographic, environmental, phenotypic, and genetic covariates and constructed a risk assessment model for development of advanced AMD. Performance of the model was evaluated using the C statistic and the Brier score and externally validated in participants in the Complications of Age-Related Macular Degeneration Prevention Trial. The final model included the following independent variables: age, smoking history, family history of AMD (first-degree member), phenotype based on a modified Age-Related Eye Disease Study simple scale score, and genetic variants CFH Y402H and ARMS2 A69S. The model did well on performance measures, with very good discrimination (C statistic = 0.872) and excellent calibration and overall performance (Brier score at 5 years = 0.08). Successful external validation was performed, and a risk assessment tool was designed for use with or without the genetic component. We constructed a risk assessment model for development of advanced AMD. The model performed well on measures of discrimination, calibration, and overall performance and was successfully externally validated. This risk assessment tool is available for online use.

  12. Ecological Risk Assessment of Genetically Modified Higher Plants (GMHP)

    DEFF Research Database (Denmark)

    Kjær, C.; Damgaard, C.; Kjellsson, G.

    Preface This publication is a first version of a manual identifying the data needs for ecological risk assessment of genetically modified higher plants (GMHP). It is the intention of the authors to stimulate further discussion of what data are needed in order to conduct a proper ecological risk...... of the project Biotechnology: elements in environmental risk assessment of genetically modified plants. December 1999 Christian Kjær Introduction In ecological risk assessment of transgenic plants, information on a wide range of subjects is needed for an effective and reliable assessment procedure...... in the amendment to the directive. This report suggests a structured way to identify the type of data needed to perform a sound ecological risk assessment for genetically modified higher plants (GMHP). The identified data types are intended to support the evaluation of the following risks: risk of invasion...

  13. Risk assessment of student performance in the International Foundations of Medicine Clinical Science Examination by the use of statistical modeling.

    Science.gov (United States)

    David, Michael C; Eley, Diann S; Schafer, Jennifer; Davies, Leo

    2016-01-01

    The primary aim of this study was to assess the predictive validity of cumulative grade point average (GPA) for performance in the International Foundations of Medicine (IFOM) Clinical Science Examination (CSE). A secondary aim was to develop a strategy for identifying students at risk of performing poorly in the IFOM CSE as determined by the National Board of Medical Examiners' International Standard of Competence. Final year medical students from an Australian university medical school took the IFOM CSE as a formative assessment. Measures included overall IFOM CSE score as the dependent variable, cumulative GPA as the predictor, and the factors age, gender, year of enrollment, international or domestic status of student, and language spoken at home as covariates. Multivariable linear regression was used to measure predictor and covariate effects. Optimal thresholds of risk assessment were based on receiver-operating characteristic (ROC) curves. Cumulative GPA (nonstandardized regression coefficient [B]: 81.83; 95% confidence interval [CI]: 68.13 to 95.53) and international status (B: -37.40; 95% CI: -57.85 to -16.96) from 427 students were found to be statistically associated with increased IFOM CSE performance. Cumulative GPAs of 5.30 (area under ROC [AROC]: 0.77; 95% CI: 0.72 to 0.82) and 4.90 (AROC: 0.72; 95% CI: 0.66 to 0.78) were identified as being thresholds of significant risk for domestic and international students, respectively. Using cumulative GPA as a predictor of IFOM CSE performance and accommodating for differences in international status, it is possible to identify students who are at risk of failing to satisfy the National Board of Medical Examiners' International Standard of Competence.

  14. The link between performance assessment and quality of data

    International Nuclear Information System (INIS)

    Csullog, G.W.

    1990-11-01

    Performance assessments, using both individual and cumulative inventories, produce estimates of the risk or dose consequences for repository concepts. Unacceptable risk or dose for a given contaminant identify it as a problem contaminant. While risk or dose consequences are common outputs of safety assessments, results can also be reported as estimates of the safe inventory limit for each contaminant in a repository scenario. Once problem contaminants are identified, it may be useful to: validate the data used in the performance assessment; restrict contaminant inventories in the repository; or, improve the containment capability of the repository (including improved packaging). A key point is that performance assessments define the quality of data to be collected. If a contaminant's inventory will be far below its estimated safe inventory limit for a repository, then it is reasonable to accept inventory estimates that have high variances and low confidence. For contaminants that have a significant impact upon performance assessments, efforts must be made to provide the best inventory (source term) estimates practicable. One important goal of characterization programs should be to establish the adequacy of data used in performance assessments. There is little value in striving to improve confidence in data for some waste streams if they are assessed to have a minor impact upon repository performance. Streams that have a major impact upon performance deserve the time, attention and money to be characterized adequately. Waste acceptance must be linked to the quality of characterization data provided by generators. This link sets compliance monitoring requirements

  15. [Risk assessment and risk control for occupational exposure to chemical toxicants from an isophorone nitrile device].

    Science.gov (United States)

    Wang, Dejun; Fu, Xiaokuan; Kong, Fanling; Sui, Shaofeng; Jiang, Yuanyuan; Du, Yinglin; Zhou, Jingyang

    2014-06-01

    Risk assessment and risk control for occupational exposure to chemical toxicants were performed on an isophorone nitrile device with an annual production of 5,000 tons, based on improved Singaporean semi-quantitative risk assessment method, with consideration of actual situation in China and in the present project. With the use of engineering analysis and identification of occupational hazards in the improved Singaporean semi-quantitative risk assessment method, hazard rating (HR) and risk assessment were performed on chemical toxicants from an isophorone nitrile device with an annual production of 5,000 tons. The chemical toxicants in the isophorone nitrile device were mainly isophorone, hydrocyanic acid, methanol, phosphoric acid, sodium hydroxide, and sodium cyanide; the HR values were mild hazard (2), extreme hazard (5), mild hazard (2), mild hazard (2), moderate hazard (3), and extreme hazard (5), respectively, and the corresponding exposure rating (ER) values were 2.09, 2.72, 2.76, 1.68, 2.0, and 1.59, respectively. The risk of chemical toxicants in this project was assessed according to the formula Risk = [HR×ER](1/2). Hydrocyanic acid was determined as high risk, sodium hydroxide and sodium cyanide as medium risk, and isophorone, methanol, and phosphoric acid as low risk. Priority in handling of risks was determined by risk rating. The table of risk control measure was established for pre-assessment of occupational hazards. With risk assessment in this study, we concluded that the isophorone nitrile device with 5,000 ton annual production was a high-occupational hazard device. This device is a project of extreme occupational hazard. The improved Singaporean semi-quantitative risk assessment method is a scientific and applicable method, and is especially suitable for pre-evaluation of on-site project with no analogy.

  16. A survey of ecological risk assessment at DOE facilities

    International Nuclear Information System (INIS)

    Barnthouse, L.W.; Bascietto, J.; Joseph, T.; Bilyard, G.

    1992-01-01

    The US Department of Energy (DOE) Risk-Based Standards Working Group is studying standard-setting and remedial action based on realistic estimates of human health and ecological risks. Federal and state regulations require DOE to assess ecological risks due to present and past operation of DOE facilities and ecological damage caused by remedial actions. Unfortunately, little technical guidance has been provided by regulatory agencies about how these assessments should be performed or what constitutes an adequate assessment. Active ecological research, environmental characterization, and ecological risk assessment programs are already underway at many locations. Some of these programs were established more than 30 years ago. Because of the strength of its existing programs and the depth of expertise available within the DOE complex, the agency is in a position to lead in developing ecological risk assessment procedures that are fully consistent with the general principles defined by EPA and that will ensure environmentally sound and cost-effective restoration of its sites. As a prelude to guidance development, the working group conducted a survey of ecological risk assessment activities at a subset of major DOE facilities. The survey was intended to (1) identify approaches now being used in ecological risk assessments performed by DOE staff and contractors at each site, (2) record successes and failures of these approaches, (3) identify new technical developments with potential for general application to many DOE facilities, and (4) identify major data needs, data resources, and methodological deficiencies

  17. Determination of Safety Performance Grade of NPP Using Integrated Safety Performance Assessment (ISPA) Program

    International Nuclear Information System (INIS)

    Chung, Dae Wook

    2011-01-01

    Since the beginning of 2000, the safety regulation of nuclear power plant (NPP) has been challenged to be conducted more reasonable, effective and efficient way using risk and performance information. In the United States, USNRC established Reactor Oversight Process (ROP) in 2000 for improving the effectiveness of safety regulation of operating NPPs. The main idea of ROP is to classify the NPPs into 5 categories based on the results of safety performance assessment and to conduct graded regulatory programs according to categorization, which might be interpreted as 'Graded Regulation'. However, the classification of safety performance categories is highly comprehensive and sensitive process so that safety performance assessment program should be prepared in integrated, objective and quantitative manner. Furthermore, the results of assessment should characterize and categorize the actual level of safety performance of specific NPP, integrating all the substantial elements for assessing the safety performance. In consideration of particular regulatory environment in Korea, the integrated safety performance assessment (ISPA) program is being under development for the use in the determination of safety performance grade (SPG) of a NPP. The ISPA program consists of 6 individual assessment programs (4 quantitative and 2 qualitative) which cover the overall safety performance of NPP. Some of the assessment programs which are already implemented are used directly or modified for incorporating risk aspects. The others which are not existing regulatory programs are newly developed. Eventually, all the assessment results from individual assessment programs are produced and integrated to determine the safety performance grade of a specific NPP

  18. Offshore risk assessment

    CERN Document Server

    Vinnem, Jan-Erik

    2014-01-01

      Offshore Risk Assessment was the first book to deal with quantified risk assessment (QRA) as applied specifically to offshore installations and operations. Risk assessment techniques have been used for more than three decades in the offshore oil and gas industry, and their use is set to expand increasingly as the industry moves into new areas and faces new challenges in older regions.   This updated and expanded third edition has been informed by a major R&D program on offshore risk assessment in Norway and summarizes research from 2006 to the present day. Rooted with a thorough discussion of risk metrics and risk analysis methodology,  subsequent chapters are devoted to analytical approaches to escalation, escape, evacuation and rescue analysis of safety and emergency systems.   Separate chapters analyze the main hazards of offshore structures: fire, explosion, collision, and falling objects as well as structural and marine hazards. Risk mitigation and control are discussed, as well as an illustrat...

  19. Development of a Risk-Based Performance Assessment Method for Long-Term Cover Systems--Application to the Monticello Mill Tailings Repository

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; ARNOLD, BILL W.; COCHRAN, JOHN R.; WEBB, STEPHEN W.; TAIRA, RANDAL Y.

    2001-01-01

    A probabilistic, risk-based performance-assessment methodology is being developed to assist designers, regulators, and involved stakeholders in the selection, design, and monitoring of long-term covers for contaminated subsurface sites. This report presents an example of the risk-based performance-assessment method using a repository site in Monticello, Utah. At the Monticello site, a long-term cover system is being used to isolate long-lived uranium mill tailings from the biosphere. Computer models were developed to simulate relevant features, events, and processes that include water flux through the cover, source-term release, vadose-zone transport, saturated-zone transport, gas transport, and exposure pathways. The component models were then integrated into a total-system performance-assessment model, and uncertainty distributions of important input parameters were constructed and sampled in a stochastic Monte Carlo analysis. Multiple realizations were simulated using the integrated model to produce cumulative distribution functions of the performance metrics, which were used to assess cover performance for both present- and long-term future conditions. Performance metrics for this study included the water percolation reaching the uranium mill tailings, radon flux at the surface, groundwater concentrations, and dose. Results of this study can be used to identify engineering and environmental parameters (e.g., liner properties, long-term precipitation, distribution coefficients) that require additional data to reduce uncertainty in the calculations and improve confidence in the model predictions. These results can also be used to evaluate alternative engineering designs and to identify parameters most important to long-term performance

  20. Development of a Risk-Based Probabilistic Performance-Assessment Method for Long-Term Cover Systems - 2nd Edition

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; ARNOLD, BILL W.; COCHRAN, JOHN R.; TAIRA, RANDAL Y.

    2002-01-01

    A probabilistic, risk-based performance-assessment methodology has been developed to assist designers, regulators, and stakeholders in the selection, design, and monitoring of long-term covers for contaminated subsurface sites. This report describes the method, the software tools that were developed, and an example that illustrates the probabilistic performance-assessment method using a repository site in Monticello, Utah. At the Monticello site, a long-term cover system is being used to isolate long-lived uranium mill tailings from the biosphere. Computer models were developed to simulate relevant features, events, and processes that include water flux through the cover, source-term release, vadose-zone transport, saturated-zone transport, gas transport, and exposure pathways. The component models were then integrated into a total-system performance-assessment model, and uncertainty distributions of important input parameters were constructed and sampled in a stochastic Monte Carlo analysis. Multiple realizations were simulated using the integrated model to produce cumulative distribution functions of the performance metrics, which were used to assess cover performance for both present- and long-term future conditions. Performance metrics for this study included the water percolation reaching the uranium mill tailings, radon gas flux at the surface, groundwater concentrations, and dose. Results from uncertainty analyses, sensitivity analyses, and alternative design comparisons are presented for each of the performance metrics. The benefits from this methodology include a quantification of uncertainty, the identification of parameters most important to performance (to prioritize site characterization and monitoring activities), and the ability to compare alternative designs using probabilistic evaluations of performance (for cost savings)

  1. Fire Risk Assessment in Germany

    International Nuclear Information System (INIS)

    Berg, H. P.

    2000-01-01

    Quantitative fire risk assessment can serve as an additional tool to assess the safety level of a nuclear power plant (NPP) and to set priorities for fire protection improvement measures. The recommended approach to be applied within periodic safety reviews of NPPs in Germany starts with a screening process providing critical fire zones in which a fully developed fire has the potential to both cause an initiating event and impair the function of at least one component or system critical to safety. The second step is to perform a quantitative analysis using a standard event tree has been developed with elements for fire initiation, ventilation of the room, fire detection, fire suppression, and fire propagation. In a final step, the fire induced frequency of initiating events, the main contributors and the calculated hazard state frequency for the fire event are determined. Results of the first quantitative fire risk studies performed in Germany are reported. (author)

  2. Concept of risk: risk assessment and nuclear safety

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1980-01-01

    The dissertation is a critical examination of risk assessment and its role in public policy. Nuclear power safety safety issues are selected as the primary source of illustrations and examples. The dissertation examines how risk assessment studies develop a concept of risk which becomes decisive for policy choices. Risk-assessment techniques are interpreted as instruments which secure an evaluation of risk which, in turn, figures prominently in technical reports on nuclear power. The philosophical critique is mounted on two levels. First, an epistemological critique surveys distinctions between the technical concept of risk and more familiar senses of risk. The critique shows that utilization of risk assessment re-structures the concept of risk. The technical concept is contrasted to the function of risk within a decision-maker's conceptual agenda and hierarchy of values. Second, an ethical critique exposes the value commitments of risk assessment recommendations. Although some of these values might be defended for policy decisions, the technical character of risk assessment obfuscates normative issues. Risk assessment is shown to be a form of factual enquiry which, nonetheless, represents a commitment to a specific selection of ethical and social values. Risk assessment should not be interpreted as a primary guide to decision unless the specific values incorporated into its concept of risk are stated explicitly and justified philosophically. Such a statement would allow value questions which have been sublimated by the factual tone of the analytic techniques to be debated on clear, social and ethical grounds

  3. Risk assessment and safety regulations in offshore oil and gas ...

    African Journals Online (AJOL)

    Risk management of which risk assessment is part, and safety regulations are common in the offshore oil and gas industry management system. The process of conducting risk assessment is mostly a challenge for operational personnel assigned to perform this function. The most significant problem is the decision to use ...

  4. Applying Multi-Criteria Analysis Methods for Fire Risk Assessment

    Directory of Open Access Journals (Sweden)

    Pushkina Julia

    2015-11-01

    Full Text Available The aim of this paper is to prove the application of multi-criteria analysis methods for optimisation of fire risk identification and assessment process. The object of this research is fire risk and risk assessment. The subject of the research is studying the application of analytic hierarchy process for modelling and influence assessment of various fire risk factors. Results of research conducted by the authors can be used by insurance companies to perform the detailed assessment of fire risks on the object and to calculate a risk extra charge to an insurance premium; by the state supervisory institutions to determine the compliance of a condition of object with requirements of regulations; by real state owners and investors to carry out actions for decrease in degree of fire risks and minimisation of possible losses.

  5. Quantum chemistry in environmental pesticide risk assessment.

    Science.gov (United States)

    Villaverde, Juan J; López-Goti, Carmen; Alcamí, Manuel; Lamsabhi, Al Mokhtar; Alonso-Prados, José L; Sandín-España, Pilar

    2017-11-01

    The scientific community and regulatory bodies worldwide, currently promote the development of non-experimental tests that produce reliable data for pesticide risk assessment. The use of standard quantum chemistry methods could allow the development of tools to perform a first screening of compounds to be considered for the experimental studies, improving the risk assessment. This fact results in a better distribution of resources and in better planning, allowing a more exhaustive study of the pesticides and their metabolic products. The current paper explores the potential of quantum chemistry in modelling toxicity and environmental behaviour of pesticides and their by-products by using electronic descriptors obtained computationally. Quantum chemistry has potential to estimate the physico-chemical properties of pesticides, including certain chemical reaction mechanisms and their degradation pathways, allowing modelling of the environmental behaviour of both pesticides and their by-products. In this sense, theoretical methods can contribute to performing a more focused risk assessment of pesticides used in the market, and may lead to higher quality and safer agricultural products. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  6. State of risk assessment

    International Nuclear Information System (INIS)

    Conrad, J.

    1978-03-01

    In view of the growing importance assumed in recent years by scientific work on the calculation, quantification, evaluation and acceptance as well as behavior in the face of risks in general and more specifically, the risks of large industrial plants, the report attempts to provide a survey of the current situation, results and evaluation of this new branch of research, risk assessment. The emphasis of the report is on the basic discussion and criticism of the theoretical and methodological approaches used in the field of risk assessment (section 3). It is concerned above all with - methodical problems of determining and quantifying risks (3.1) - questions of the possibility of risk evaluation and comp arison (3.1, 3.2) - the premises of normative and empirical studies on decision making under risk (3.2, 3.3) - investigations into society's acceptance of risks involved in the introduction of new technologies (3.4) - attempts to combine various aspects of the field of risk assessment in a unified concept (3.5, 3.6, 3.7). Because risk assessment is embedded in the framework of decision theory and technology assessment, it can be implicitly evaluated at a more general level within this framework, as far as its possibilities and weaknesses of method and application are concerned (section 4). Sections 2 and 5 deal with the social context of origin and utilization of risk assessment. Finally, an attempt is made at a summary indicating the possible future development of risk assessment. (orig./HP) [de

  7. Risk assessment and risk management of mycotoxins.

    Science.gov (United States)

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  8. The Symbiose project: an integrated framework for performing environmental radiological risk assessment

    International Nuclear Information System (INIS)

    Gonze, M.A.; Mourlon, C.; Garcia-Sanchez, L.; Beaugelin, K.; Chen, T.; Le Dizes, S.

    2004-01-01

    Human health and ecological risk assessments usually require the integration of a wide range of environmental data and modelling approaches, with a varying level of detail dependent on the management objectives, the complexity of the site and the level of ignorance about the pollutant behaviour/toxicity. Like most scientists and assessors did it recently, we recognized the need for developing comprehensive, integrated and flexible approaches to risk assessment. To meet these needs, IRSN launched the Symbiose project (2002-2006) which aims first, at designing a framework for integrating and managing data, methods and knowledge of some relevance in radiological risk to humans/biota assessment studies, and second, at implementing this framework in an information management, modelling and calculation platform. Feasibility developments (currently completed) led to the specification of a fully integrated, object-oriented and hierarchical approach for describing the fate, transport and effect of radionuclides in spatially-distributed environmental systems. This innovative approach has then been implemented in a platform prototype, main components of which are a user-friendly and modular simulation environment (e.g. using GoldSim toolbox), and a hierarchical object-oriented biosphere database. Both conceptual and technical developments will be presented here. (author)

  9. Biosafety Risk Assessment Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Caskey, Susan Adele [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Gaudioso, Jennifer M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Salerno, Reynolds Mathewson [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Wagner, Stefan M. [Public Health Agency of Canada, Winnipeg, MB (Canada). Canadian Science Centre for Human and Animal Health (CSCHAH); Shigematsu, Mika [National Inst. of Infectious Diseases (NIID), Tokyo (Japan); Risi, George [Infectious Disease Specialists, P.C, Missoula, MT (United States); Kozlovac, Joe [US Dept. of Agriculture (USDA)., Beltsville, MD (United States); Halkjaer-Knudsen, Vibeke [Statens Serum Inst., Copenhagen (Denmark); Prat, Esmeralda [Bayer CropScience, Monheim am Rhein (Germany)

    2010-10-01

    Laboratories that work with biological agents need to manage their safety risks to persons working the laboratories and the human and animal community in the surrounding areas. Biosafety guidance defines a wide variety of biosafety risk mitigation measures, which include measures which fall under the following categories: engineering controls, procedural and administrative controls, and the use of personal protective equipment; the determination of which mitigation measures should be used to address the specific laboratory risks are dependent upon a risk assessment. Ideally, a risk assessment should be conducted in a manner which is standardized and systematic which allows it to be repeatable and comparable. A risk assessment should clearly define the risk being assessed and avoid over complication.

  10. A comparison of radiological risk assessment models: Risk assessment models used by the BEIR V Committee, UNSCEAR, ICRP, and EPA (for NESHAP)

    International Nuclear Information System (INIS)

    Wahl, L.E.

    1994-03-01

    Radiological risk assessments and resulting risk estimates have been developed by numerous national and international organizations, including the National Research Council's fifth Committee on the Biological Effects of Ionizing Radiations (BEIR V), the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR), and the International Commission on Radiological Protection (ICRP). A fourth organization, the Environmental Protection Agency (EPA), has also performed a risk assessment as a basis for the National Emission Standards for Hazardous Air Pollutants (NESHAP). This paper compares the EPA's model of risk assessment with the models used by the BEIR V Committee, UNSCEAR, and ICRP. Comparison is made of the values chosen by each organization for several model parameters: populations used in studies and population transfer coefficients, dose-response curves and dose-rate effects, risk projection methods, and risk estimates. This comparison suggests that the EPA has based its risk assessment on outdated information and that the organization should consider adopting the method used by the BEIR V Committee, UNSCEAR, or ICRP

  11. Risk-adjusted Outcomes of Clinically Relevant Pancreatic Fistula Following Pancreatoduodenectomy: A Model for Performance Evaluation.

    Science.gov (United States)

    McMillan, Matthew T; Soi, Sameer; Asbun, Horacio J; Ball, Chad G; Bassi, Claudio; Beane, Joal D; Behrman, Stephen W; Berger, Adam C; Bloomston, Mark; Callery, Mark P; Christein, John D; Dixon, Elijah; Drebin, Jeffrey A; Castillo, Carlos Fernandez-Del; Fisher, William E; Fong, Zhi Ven; House, Michael G; Hughes, Steven J; Kent, Tara S; Kunstman, John W; Malleo, Giuseppe; Miller, Benjamin C; Salem, Ronald R; Soares, Kevin; Valero, Vicente; Wolfgang, Christopher L; Vollmer, Charles M

    2016-08-01

    To evaluate surgical performance in pancreatoduodenectomy using clinically relevant postoperative pancreatic fistula (CR-POPF) occurrence as a quality indicator. Accurate assessment of surgeon and institutional performance requires (1) standardized definitions for the outcome of interest and (2) a comprehensive risk-adjustment process to control for differences in patient risk. This multinational, retrospective study of 4301 pancreatoduodenectomies involved 55 surgeons at 15 institutions. Risk for CR-POPF was assessed using the previously validated Fistula Risk Score, and pancreatic fistulas were stratified by International Study Group criteria. CR-POPF variability was evaluated and hierarchical regression analysis assessed individual surgeon and institutional performance. There was considerable variability in both CR-POPF risk and occurrence. Factors increasing the risk for CR-POPF development included increasing Fistula Risk Score (odds ratio 1.49 per point, P ratio 3.30, P performance outliers were identified at the surgeon and institutional levels. Of the top 10 surgeons (≥15 cases) for nonrisk-adjusted performance, only 6 remained in this high-performing category following risk adjustment. This analysis of pancreatic fistulas following pancreatoduodenectomy demonstrates considerable variability in both the risk and occurrence of CR-POPF among surgeons and institutions. Disparities in patient risk between providers reinforce the need for comprehensive, risk-adjusted modeling when assessing performance based on procedure-specific complications. Furthermore, beyond inherent patient risk factors, surgical decision-making influences fistula outcomes.

  12. 2007 TOXICOLOGY AND RISK ASSESSMENT ...

    Science.gov (United States)

    EPA has announced The 2007 Toxicology and Risk Assessment Conference Cincinnati Marriott North, West Chester (Cincinnati), OHApril 23- 26, 2007 - Click to register!The Annual Toxicology and Risk Assessment Conference is a unique meeting where several Government Agencies come together to discuss toxicology and risk assessment issues that are not only of concern to the government, but also to a broader audience including academia and industry. The theme of this year's conference is Emerging Issues and Challenges in Risk Assessment and the preliminary agenda includes: Plenary Sessions and prominent speakers (tentative) include: Issues of Emerging Chemical ContaminantsUncertainty and Variability in Risk Assessment Use of Mechanistic data in IARC evaluationsParallel Sessions:Uncertainty and Variability in Dose-Response Assessment Recent Advances in Toxicity and Risk Assessment of RDX The Use of Epidemiologic Data for Risk Assessment Applications Cumulative Health Risk Assessment:

  13. Developing RESRAD-BASELINE for environmental baseline risk assessment

    International Nuclear Information System (INIS)

    Cheng, Jing-Jy.

    1995-01-01

    RESRAD-BASELINE is a computer code developed at Argonne developed at Argonne National Laboratory for the US Department of Energy (DOE) to perform both radiological and chemical risk assessments. The code implements the baseline risk assessment guidance of the US Environmental Protection Agency (EPA 1989). The computer code calculates (1) radiation doses and cancer risks from exposure to radioactive materials, and (2) hazard indexes and cancer risks from exposure to noncarcinogenic and carcinogenic chemicals, respectively. The user can enter measured or predicted environmental media concentrations from the graphic interface and can simulate different exposure scenarios by selecting the appropriate pathways and modifying the exposure parameters. The database used by PESRAD-BASELINE includes dose conversion factors and slope factors for radionuclides and toxicity information and properties for chemicals. The user can modify the database for use in the calculation. Sensitivity analysis can be performed while running the computer code to examine the influence of the input parameters. Use of RESRAD-BASELINE for risk analysis is easy, fast, and cost-saving. Furthermore, it ensures in consistency in methodology for both radiological and chemical risk analyses

  14. Risk assessment for transportation of radioactive materials and nuclear explosives

    International Nuclear Information System (INIS)

    Clauss, D.B.; Wilson, R.K.; Hartman, W.F.

    1991-01-01

    Sandia National Laboratories has the lead technical role for probabilistic risk assessments of transportation of nuclear weapons, components, and special nuclear material in support of the US Department of Energy. The emphasis of the risk assessments is on evaluating the probability of inadvertent disposal of radioactive material and the consequences of such a release. This paper will provide an overview of the methodology being developed for the risk assessment and will discuss the interpretation and use of the results. The advantages and disadvantages of using risk assessment as an alternative to performance-based criteria for packaging will be described. 2 refs., 1 fig

  15. Determining cutoff distances for assessing risks from transportation accident radiation releases

    International Nuclear Information System (INIS)

    Sandquist, G.M.; Slaughter, D.M.; Kimura, C.Y.; Brumburgh, G.

    1995-01-01

    The transportation of radioactive materials throughout the United States and the world is a ubiquitous and sometimes controversial activity. Almost universally, these transportation activities have been performed without major incident, and the safety record for transportation of radioactive material is outstanding compared with the transportation of other hazardous materials. Nevertheless, concerns still exist regarding adequate regulation of radioactive material transportation and accurate assessment of the health risks associated with accidents. These concerns are addressed through certification by the cognizant regulatory authority over the transportation container or the performance of a transportation risk assessment. In a transportation risk assessment, accident situations are examined, frequencies are estimated, and consequences resulting from the accident are analyzed and evaluated for acceptance. A universal question with any transportation risk assessment that examines the radiological consequences from release accidents is, At what distance may the dispersion analysis be terminated? This paper examines cutoff distances and their consequences for assessing health risks from radiological transportation releases

  16. Use of ecological exposure units in ecological risk assessment

    International Nuclear Information System (INIS)

    Ferenbaugh, R.; Myers, O.; Gallegos, A.; Breshears, D.; Ebinger, M.

    1995-01-01

    The traditional approach to ecological risk assessment at hazardous waste sites that are being evaluated for cleanup under CERCLA or RCRA requirements is to focus on the immediate impacts at or adjacent to a site. While this may be acceptable in some situations, it is not ecologically defensible in situations where there are numerous contaminated sites in proximity to each other. In the latter case, transport from the sites, potential cumulative effects, and wide-ranging receptors must be considered. The concept of the Ecological Exposure Unit (EEU) has been proposed to address this situation. Ecological Exposure Units are defined on the basis of ecological considerations and each EEU may contain several to many contaminated sites. The initial steps involved in performing ecological risk assessments using the EEU approach include (1) selection of appropriate receptors and assessment endpoints, and (2) geographical definition of EEUs. At Los Alamos National Laboratory, receptors have been identified and EEUs have been defined for these receptors. GIS is being used as a tool to map EEUs. Receptors include representatives from threatened or endangered species, species reflecting status of ecological health, species with social or cultural relevance, and other species of concern. After definition of EEUs, cumulative impacts of all stressors at all sites within each EEU must be evaluated. The two major advantages to performing ecological risk assessments using this approach are that risk assessments are performed in a more scientifically defensible manner because they are performed on ecologically defined units and that resources are used optimally by minimizing redundant remedial activities

  17. Supplemental Hazard Analysis and Risk Assessment - Hydrotreater

    Energy Technology Data Exchange (ETDEWEB)

    Lowry, Peter P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wagner, Katie A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-04-01

    A supplemental hazard analysis was conducted and quantitative risk assessment performed in response to an independent review comment received by the Pacific Northwest National Laboratory (PNNL) from the U.S. Department of Energy Pacific Northwest Field Office (PNSO) against the Hydrotreater/Distillation Column Hazard Analysis Report issued in April 2013. The supplemental analysis used the hazardous conditions documented by the previous April 2013 report as a basis. The conditions were screened and grouped for the purpose of identifying whether additional prudent, practical hazard controls could be identified, using a quantitative risk evaluation to assess the adequacy of the controls and establish a lower level of concern for the likelihood of potential serious accidents. Calculations were performed to support conclusions where necessary.

  18. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  19. Using Risk Assessment Methodologies to Meet Management Objectives

    Science.gov (United States)

    DeMott, D. L.

    2015-01-01

    Corporate and program objectives focus on desired performance and results. ?Management decisions that affect how to meet these objectives now involve a complex mix of: technology, safety issues, operations, process considerations, employee considerations, regulatory requirements, financial concerns and legal issues. ?Risk Assessments are a tool for decision makers to understand potential consequences and be in a position to reduce, mitigate or eliminate costly mistakes or catastrophic failures. Using a risk assessment methodology is only a starting point. ?A risk assessment program provides management with important input in the decision making process. ?A pro-active organization looks to the future to avoid problems, a reactive organization can be blindsided by risks that could have been avoided. ?You get out what you put in, how useful your program is will be up to the individual organization.

  20. Handling Interdependencies in Climate Change Risk Assessment

    Directory of Open Access Journals (Sweden)

    Richard J. Dawson

    2015-12-01

    Full Text Available Typically, a climate change risk assessment focuses on individual sectors or hazards. However, interdependencies between climate risks manifest themselves via functional, physical, geographical, economic, policy and social mechanisms. These can occur over a range of spatial or temporal scales and with different strengths of coupling. Three case studies are used to demonstrate how interdependencies can significantly alter the nature and magnitude of risk, and, consequently, investment priorities for adaptation. The three examples explore interdependencies that arise from (1 climate loading dependence; (2 mediation of two climate impacts by physical processes operating over large spatial extents; and, (3 multiple risks that are influenced by shared climatic and socio-economic drivers. Drawing upon learning from these case studies, and other work, a framework for the analysis and consideration of interdependencies in climate change risk assessment has been developed. This is an iterative learning loop that involves defining the system, scoping interaction mechanisms, applying appropriate modelling tools, identifying vulnerabilities and opportunities, and assessing the performance of adaptation interventions.

  1. Chemical Risk Assessment

    Science.gov (United States)

    This course is aimed at providing an overview of the fundamental guiding principles and general methods used in chemical risk assessment. Chemical risk assessment is a complex and ever-evolving process. These principles and methods have been organized by the National Research Cou...

  2. An integrated risk assessment approach: Risk assessment in the programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Morris, J.M.

    1994-01-01

    The following paper is an informal summary of salient points made in the presentation entitled open-quotes An Integrated Risk Assessment Approach: Risk Assessment in the Programmatic Environmental Impact Statement (PEIS).close quotes. This presentation was given at the U.S. DOE Integrated Planning Workshop in Denver, Colorado on June 2, 1994. Integrated decision analysis is very important in environmental restoration and waste management in the evaluation of such things as land use planning, waste load forecasting, cost analyses, and technology development activities. Integrated risk assessment is an approach that addresses multiple components of risk, including: risks from surplus facilities as well as typical environmental restoration sites, risks to the public, risks to workers, ecological risk, risks before, during and after remediation activities, and others

  3. U.S. Department of energy worker health risk evaluation methodology for assessing risks associated with environmental restoration and waste management

    International Nuclear Information System (INIS)

    Blaylock, B.P.; Legg, J.; Travis, C.C.; Scofield, P.A.

    1995-06-01

    This document describes a worker health risk evaluation methodology for assessing risks associated with Environmental Restoration (ER) and Waste Management (WM). The methodology is appropriate for estimating worker risks across the Department of Energy (DOE) Complex at both programmatic and site-specific levels. This document supports the worker health risk methodology used to perform the human health risk assessment portion of the DOE Programmatic Environmental Impact Statement (PEIS) although it has applications beyond the PEIS, such as installation-wide worker risk assessments, screening-level assessments, and site-specific assessments

  4. U.S. Department of Energy worker health risk evaluation methodology for assessing risks associated with environmental restoration and waste management

    Energy Technology Data Exchange (ETDEWEB)

    Blaylock, B.P.; Legg, J.; Travis, C.C. [Oak Ridge National Lab., TN (United States). Center for Risk Management; Simek, M.A.; Sutherland, J. [Univ. of Tennessee, Knoxville, TN (United States); Scofield, P.A. [Office of Environmental Compliance and Documentation (United States)

    1995-06-01

    This document describes a worker health risk evaluation methodology for assessing risks associated with Environmental Restoration (ER) and Waste Management (WM). The methodology is appropriate for estimating worker risks across the Department of Energy (DOE) Complex at both programmatic and site-specific levels. This document supports the worker health risk methodology used to perform the human health risk assessment portion of the DOE Programmatic Environmental Impact Statement (PEIS) although it has applications beyond the PEIS, such as installation-wide worker risk assessments, screening-level assessments, and site-specific assessments.

  5. The relation of risk assessment and health impact assessment

    DEFF Research Database (Denmark)

    Ádám, Balázs; Gulis, Gabriel

    2013-01-01

    than assessing a present situation. As part of this process, however, methods applied in risk assessment are used. Risk assessment typically characterises relation of a well-defined risk factor to a well-defined health outcome. Within HIA usually several individual risk assessments are needed...... of the causal chain from the proposal through related health determinants and risk factors to health outcomes. The stepwise analysis, systematic prioritization and consideration of horizontal interactions between the causal pathways make it feasible to use widely recognized risk assessment methods in the HIA......The level and distribution of health risks in a society is substantially influenced by measures of various policies, programmes or projects. Risk assessment can evaluate the nature, likelihood and severity of an adverse effect. Health impact assessment (HIA) provides similar function when used...

  6. Assessment of cardiovascular risk.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2010-10-01

    Atherosclerotic cardiovascular disease (CVD) is the most common cause of death worldwide. Usually atherosclerosis is caused by the combined effects of multiple risk factors. For this reason, most guidelines on the prevention of CVD stress the assessment of total CVD risk. The most intensive risk factor modification can then be directed towards the individuals who will derive the greatest benefit. To assist the clinician in calculating the effects of these multiple interacting risk factors, a number of risk estimation systems have been developed. This review address several issues regarding total CVD risk assessment: Why should total CVD risk be assessed? What risk estimation systems are available? How well do these systems estimate risk? What are the advantages and disadvantages of the current systems? What are the current limitations of risk estimation systems and how can they be resolved? What new developments have occurred in CVD risk estimation?

  7. Methodology for the assessment of human health risks associated ...

    African Journals Online (AJOL)

    Studies have shown that the aquatic environment can be polluted by contaminates that are accumulated by freshwater fish and this may pose a health risk to the ... bioaccumulation potential and health risks of analytes, sound sampling design, risk assessment procedures and performing monitoring at different scales and ...

  8. Reconsidering the risk assessment concept: Standardizing the impact description as a building block for vulnerability assessment

    Directory of Open Access Journals (Sweden)

    K. Hollenstein

    2005-01-01

    Full Text Available Risk assessments for natural hazards are becoming more widely used and accepted. Using an extended definition of risk, it becomes obvious that performant procedures for vulnerability assessments are vital for the success of the risk concept. However, there are large gaps in knowledge about vulnerability. To alleviate the situation, a conceptual extension of the scope of existing and new models is suggested. The basis of the suggested concept is a stadardization of the output of hazard assessments. This is achieved by defining states of the target objects that depend on the impact and at the same time affect the object's performance characteristics. The possible state variables can be related to a limited set of impact descriptors termed generic impact description interface. The concept suggests that both hazard and vulnerability assessment models are developed according to the specification of this interface, thus facilitating modularized risk assessments. Potential problems related to the application of the concept include acceptance issues and the lacking accuracy of transformation of outputs of existing models. Potential applications and simple examples for adapting existing models are briefly discussed.

  9. A framework for global river flood risk assessments

    Science.gov (United States)

    Winsemius, H. C.; Van Beek, L. P. H.; Jongman, B.; Ward, P. J.; Bouwman, A.

    2013-05-01

    There is an increasing need for strategic global assessments of flood risks in current and future conditions. In this paper, we propose a framework for global flood risk assessment for river floods, which can be applied in current conditions, as well as in future conditions due to climate and socio-economic changes. The framework's goal is to establish flood hazard and impact estimates at a high enough resolution to allow for their combination into a risk estimate, which can be used for strategic global flood risk assessments. The framework estimates hazard at a resolution of ~ 1 km2 using global forcing datasets of the current (or in scenario mode, future) climate, a global hydrological model, a global flood-routing model, and more importantly, an inundation downscaling routine. The second component of the framework combines hazard with flood impact models at the same resolution (e.g. damage, affected GDP, and affected population) to establish indicators for flood risk (e.g. annual expected damage, affected GDP, and affected population). The framework has been applied using the global hydrological model PCR-GLOBWB, which includes an optional global flood routing model DynRout, combined with scenarios from the Integrated Model to Assess the Global Environment (IMAGE). We performed downscaling of the hazard probability distributions to 1 km2 resolution with a new downscaling algorithm, applied on Bangladesh as a first case study application area. We demonstrate the risk assessment approach in Bangladesh based on GDP per capita data, population, and land use maps for 2010 and 2050. Validation of the hazard estimates has been performed using the Dartmouth Flood Observatory database. This was done by comparing a high return period flood with the maximum observed extent, as well as by comparing a time series of a single event with Dartmouth imagery of the event. Validation of modelled damage estimates was performed using observed damage estimates from the EM

  10. A framework for global river flood risk assessments

    Directory of Open Access Journals (Sweden)

    H. C. Winsemius

    2013-05-01

    Full Text Available There is an increasing need for strategic global assessments of flood risks in current and future conditions. In this paper, we propose a framework for global flood risk assessment for river floods, which can be applied in current conditions, as well as in future conditions due to climate and socio-economic changes. The framework's goal is to establish flood hazard and impact estimates at a high enough resolution to allow for their combination into a risk estimate, which can be used for strategic global flood risk assessments. The framework estimates hazard at a resolution of ~ 1 km2 using global forcing datasets of the current (or in scenario mode, future climate, a global hydrological model, a global flood-routing model, and more importantly, an inundation downscaling routine. The second component of the framework combines hazard with flood impact models at the same resolution (e.g. damage, affected GDP, and affected population to establish indicators for flood risk (e.g. annual expected damage, affected GDP, and affected population. The framework has been applied using the global hydrological model PCR-GLOBWB, which includes an optional global flood routing model DynRout, combined with scenarios from the Integrated Model to Assess the Global Environment (IMAGE. We performed downscaling of the hazard probability distributions to 1 km2 resolution with a new downscaling algorithm, applied on Bangladesh as a first case study application area. We demonstrate the risk assessment approach in Bangladesh based on GDP per capita data, population, and land use maps for 2010 and 2050. Validation of the hazard estimates has been performed using the Dartmouth Flood Observatory database. This was done by comparing a high return period flood with the maximum observed extent, as well as by comparing a time series of a single event with Dartmouth imagery of the event. Validation of modelled damage estimates was performed using observed damage estimates from

  11. Occupational health policies on risk assessment in Japan.

    Science.gov (United States)

    Horie, Seichi

    2010-09-01

    Industrial Safety and Health Law (ISH Law) of Japan requires abnormalities identified in evaluations of worker health and working environments are reported to occupational physicians, and employers are advised of measures to ensure appropriate accommodations in working environments and work procedures. Since the 1980s, notions of a risk assessment and occupational safety and health management system were expected to further prevent industrial accidents. In 2005, ISH Law stipulated workplace risk assessment using the wording "employers shall endeavor." Following the amendment, multiple documents and guidelines for risk assessment for different work procedures were developed. They require ISH Laws to be implemented fully and workplaces to plan and execute measures to reduce risks, ranking them from those addressing potential hazards to those requiring workers to wear protective articles. A governmental survey in 2005 found the performance of risk assessment was 20.4% and common reasons for not implementing risk assessments were lack of adequate personnel or knowledge. ISH Law specifies criminal penalties for both individuals and organizations. Moreover, under the Labor Contract Law promulgated in 2007, employers are obliged to make reasonable efforts to ensure employee health for foreseeable and avoidable risks. Therefore, enterprises neglecting even the non-binding provisions of guidelines are likely to suffer significant business impact if judged to be responsible for industrial accidents or occupational disease. To promote risk assessment, we must strengthen technical, financial, and physical support from public-service organizations, encourage the dissemination of good practices to reduce risks, and consider additional employer incentives, including relaxed mandatory regulations.

  12. Occupational Health Policies on Risk Assessment in Japan

    Directory of Open Access Journals (Sweden)

    Seichi Horie

    2010-09-01

    Full Text Available Industrial Safety and Health Law (ISH Law of Japan requires abnormalities identifi ed in evaluations of worker health and working environments are reported to occupational physicians, and employers are advised of measures to ensure appropriate accommodations in working environments and work procedures. Since the 1980s, notions of a risk assessment and occupational safety and health management system were expected to further prevent industrial accidents. In 2005, ISH Law stipulated workplace risk assessment using the wording “employers shall endeavor.” Following the amendment, multiple documents and guidelines for risk assessment for different work procedures were developed. They require ISH Laws to be implemented fully and workplaces to plan and execute measures to reduce risks, ranking them from those addressing potential hazards to those requiring workers to wear protective articles. A governmental survey in 2005 found the performance of risk assessment was 20.4% and common reasons for not implementing risk assessments were lack of adequate personnel or knowledge. ISH Law specifi es criminal penalties for both individuals and organizations. Moreover, under the Labor Contract Law promulgated in 2007, employers are obliged to make reasonable efforts to ensure employee health for foreseeable and avoidable risks. Therefore, enterprises neglecting even the non-binding provisions of guidelines are likely to suffer signifi cant business impact if judged to be responsible for industrial accidents or occupational disease. To promote risk assessment, we must strengthen technical, fi nancial, and physical support from public-service organizations, encourage the dissemination of good practices to reduce risks, and consider additional employer incentives, including relaxed mandatory regulations.

  13. A review on the performance of osteoporosis self-assessment tool for Asians in determining osteoporosis and fracture risk.

    Science.gov (United States)

    Chin, Kok-Yong

    2017-09-01

    The prevalence of osteoporosis in Asian countries is growing. An effective screening method will enable patients at risk for osteoporosis to receive early diagnosis and treatment, and avoid overcrowding the limited dual-energy x-ray absorptiometry (DXA) machines available in Asian countries. Many simple osteoporosis screening algorithms have been developed but they are not validated for use in Asian populations. osteoporosis self-assessment tools for Asians (OSTA), established using a multinational Asian cohort, is the first screening algorithm that caters for the Asian populations. It considers only body weight and age in the algorithm. It shows consistently high performance and sensitivity in identifying postmenopausal women at risk for osteoporosis in many Asian countries. Its usage has been expanded for identifying osteoporosis in men, as well as determining fracture risk for both sexes. However, the performance of OSTA is influenced by age, sex, ethnicity and site of BMD measurement to define osteoporosis. Its usage is also limited in individuals without apparent risk factors. These limitations should be noted by physicians considering the use of OSTA in clinical setting. As a conclusion, OSTA is a cost-effective measure for osteoporosis screening in primary healthcare setting.

  14. Microbial risk assessment of Vibrio spp. in seafood products in Mexico

    Directory of Open Access Journals (Sweden)

    Karla M López-Hernández

    2014-05-01

    Full Text Available Food-borne diseases are among the major public health problems that currently exist. Microbiological risk assessment is a process used to evaluate the hidden hazards in food, the likelihood of exposure to these hazards and their impact on public health. Risk assessment is performed in four steps: hazard identification, hazard characterization, assessment of exposure and risk characterization. According to the process/response microbial risk assessment is classified in two categories, qualitative and quantitative. The aim of this review is to underline the importance of implementing assessments in seafood that is usually consumed raw, strengthening access to good quality and safe food for the consumer’s benefit and to stress the necessity of microbiological risks assessments in Mexico.

  15. Probabilistic risk assessment of earthquakes at the Rocky Flats Plant and subsequent upgrade to reduce risk

    International Nuclear Information System (INIS)

    Day, S.A.

    1989-01-01

    An analysis to determine the risk associated with earthquakes at the Rocky Flats Plant was performed. Seismic analyses and structural evaluations were used to postulate building and equipment damage and radiological releases to the environment from various magnitudes of earthquakes. Dispersion modeling and dose assessment to the public were then calculated. The frequency of occurrence of various magnitudes of earthquakes were determined from the Department of Energy natural Phenomena Hazards Modeling Project. Risk to the public was probabilistically assessed for each magnitude of earthquake and for overall seismic risk. Based on the results of this Probabilistic Risk Assessment and a cost/benefit analysis, seismic upgrades are being implemented for several plutonium-handling facilities for the purpose of risk reduction

  16. Applicability and feasibility of systematic review for performing evidence-based risk assessment in food and feed safety

    DEFF Research Database (Denmark)

    Aiassa, E.; Higgins, J.P.T.; Frampton, G. K.

    2015-01-01

    for answering questions in health care, and can be implemented to minimise biases in food and feed safety risk assessment. However, no methodological frameworks exist for refining risk assessment multi-parameter models into questions suitable for systematic review, and use of meta-analysis to estimate all......Food and feed safety risk assessment uses multi-parameter models to evaluate the likelihood of adverse events associated with exposure to hazards in human health, plant health, animal health, animal welfare and the environment. Systematic review and meta-analysis are established methods...... parameters in the risk model. This approach to planning and prioritising systematic review seems to have useful implications for producing evidence-based food and feed safety risk assessment....

  17. Information needs for risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  18. Performance and risk assessment of subsurface barriers for single-shell tank waste retrieval

    Energy Technology Data Exchange (ETDEWEB)

    Bazinet, G.D.; Cruse, J.M.; Hampsten, K.L. [Westinghouse Hanford Co., Richland, WA (United States); Treat, R.L.

    1995-02-01

    Subsurface barriers are among various alternatives under evaluation to mitigate the threat of leakage from the Hanford Site`s 149 single-shell high-level radioactive waste tanks. The Tank Waste Remediation System (TWRS) division of Westinghouse Hanford Company is conducting this evaluation of subsurface barriers and other alternatives, focusing on risk and cost as performance measures. A number of alternative retrieval/closure approaches were evaluated in terms of risks (carcinogenic and toxicological) to a postulated maximally exposed individual. In addition, worker and accident risks were evaluated and factors developed for each alternative on a relative basis. The work performed to date indicates the use of subsurface barriers may potentially reduce public risk by limiting contamination of groundwater below the Hanford Site; however, the cost in terms of actual funding and in elevated worker risk is significant. The analyses also assume certain performance levels for technologies that have not been demonstrated in field conditions similar to Hanford Site tank farms. The evaluations summarized herein are being used to support a decision by representatives of the US Department of Energy, Richland Operations Office, the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA) regarding potential further development of subsurface barrier technology.

  19. Performance and risk assessment of subsurface barriers for single-shell tank waste retrieval

    International Nuclear Information System (INIS)

    Bazinet, G.D.; Cruse, J.M.; Hampsten, K.L.; Treat, R.L.

    1995-02-01

    Subsurface barriers are among various alternatives under evaluation to mitigate the threat of leakage from the Hanford Site's 149 single-shell high-level radioactive waste tanks. The Tank Waste Remediation System (TWRS) division of Westinghouse Hanford Company is conducting this evaluation of subsurface barriers and other alternatives, focusing on risk and cost as performance measures. A number of alternative retrieval/closure approaches were evaluated in terms of risks (carcinogenic and toxicological) to a postulated maximally exposed individual. In addition, worker and accident risks were evaluated and factors developed for each alternative on a relative basis. The work performed to date indicates the use of subsurface barriers may potentially reduce public risk by limiting contamination of groundwater below the Hanford Site; however, the cost in terms of actual funding and in elevated worker risk is significant. The analyses also assume certain performance levels for technologies that have not been demonstrated in field conditions similar to Hanford Site tank farms. The evaluations summarized herein are being used to support a decision by representatives of the US Department of Energy, Richland Operations Office, the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA) regarding potential further development of subsurface barrier technology

  20. [Manual material handling risk assessment and ergonomic improvement in foodstuff retailing company].

    Science.gov (United States)

    Maso, S; Maccà, I; Simonetti, A; Scopa, P; Paruzzolo, P; Bonacci, A; Murgolo, I; Bartolucci, G B

    2011-01-01

    The aim of this study is to assess and reduce the risk due to manual material handling in a company involved in the foodstuff retailing. The risk assessment was performed by NIOSH Variable Lifing Index in 13 different occupational conditions. As result the risk was present in any case, with VLI values ranging from 2.12 to 2.81. A good risk reduction has been accomplished correcting properly the most important multiplier involved in the computation of the revised NIOSH Lifting equation (lifting frequency and weight of heavier products). Even if the performed risk reduction has been significant, the residual risk is still higher than the level of acceptability.

  1. A perspective of PC-based probabilistic risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.; Rasmuson, D.M.; Robinson, R.C.; Russell, K.D.; Van Siclen, V.S.

    1987-01-01

    Probabilistic risk assessment (PRA) information has been under-utilized in the past due to the large effort required to input the PRA data and the large expense of the computers needed to run PRA codes. The microcomputer-based Integrated Reliability and Risk Analysis System (IRRAS) and the System Analysis and Risk Assessment (SARA) System, under development at the Idaho National Engineering Laboratory, have greatly enhanced the ability of managers to use PRA techniques in their decision-making. IRRAS is a tool that allows an analyst to create, modify, update, and reanalyze a plant PRA to keep the risk assessment current with the plant's configuration and operation. The SARA system is used to perform sensitivity studies on the results of a PRA. This type of analysis can be used to evaluate proposed changes to a plant or its operation. The success of these two software projects demonstrate that risk information can be made readily available to those that need it. This is the first step in the development of a true risk management capability

  2. Environmental risk assessment of pesticides: state of the art and prospective improvement from science.

    Science.gov (United States)

    Boivin, Arnaud; Poulsen, Véronique

    2017-03-01

    Pesticide risk assessment in the European regulatory framework is mandatory performed for active substances (pesticides) and the plant protection products they are constituents of. The aim is to guarantee that safe use can be achieved for the intended use of the product. This paper provides a feedback on the regulatory environmental risk assessment performed for pesticide registration at the EU and member state levels. The different steps of pesticide registration are addressed considering both exposure and hazard. In this paper, we focus on the environmental fate and behaviour in surface water together with the aquatic ecotoxicity of the substances to illustrate pesticide regulatory risk assessment performed for aquatic organisms. Current methodologies are presented along with highlights on potential improvements. For instance, as regards exposure aspects, moving from field based to landscape risk assessments is promising. Regarding ecotoxicology, ecological models may be valuable tools when applied to chemical risk assessment. In addition, interest and further developments to better take into account mitigation measures in risk assessment and management are also presented.

  3. Risk assessment of maintenance operations: the analysis of performing task and accident mechanism.

    Science.gov (United States)

    Carrillo-Castrillo, Jesús A; Rubio-Romero, Juan Carlos; Guadix, Jose; Onieva, Luis

    2015-01-01

    Maintenance operations cover a great number of occupations. Most small and medium-sized enterprises lack the appropriate information to conduct risk assessments of maintenance operations. The objective of this research is to provide a method based on the concepts of task and accident mechanisms for an initial risk assessment by taking into consideration the prevalence and severity of the maintenance accidents reported. Data were gathered from 11,190 reported accidents in maintenance operations in the manufacturing sector of Andalusia from 2003 to 2012. By using a semi-quantitative methodology, likelihood and severity were evaluated based on the actual distribution of accident mechanisms in each of the tasks. Accident mechanisms and tasks were identified by using those variables included in the European Statistics of Accidents at Work methodology. As main results, the estimated risk of the most frequent accident mechanisms identified for each of the analysed tasks is low and the only accident mechanisms with medium risk are accidents when lifting or pushing with physical stress on the musculoskeletal system in tasks involving carrying, and impacts against objects after slipping or stumbling for tasks involving movements. The prioritisation of public preventive actions for the accident mechanisms with a higher estimated risk is highly recommended.

  4. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  5. Strategic Risk Assessment

    Science.gov (United States)

    Derleth, Jason; Lobia, Marcus

    2009-01-01

    This slide presentation provides an overview of the attempt to develop and demonstrate a methodology for the comparative assessment of risks across the entire portfolio of NASA projects and assets. It includes information about strategic risk identification, normalizing strategic risks, calculation of relative risk score, and implementation options.

  6. Overview of risk assessment

    International Nuclear Information System (INIS)

    Rimington, J.D.

    1992-01-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits

  7. Overview of risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rimington, J D [Health and Safety Executive (United Kingdom)

    1992-07-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits.

  8. [Urban ecological risk assessment: a review].

    Science.gov (United States)

    Wang, Mei-E; Chen, Wei-Ping; Peng, Chi

    2014-03-01

    With the development of urbanization and the degradation of urban living environment, urban ecological risks caused by urbanization have attracted more and more attentions. Based on urban ecology principles and ecological risk assessment frameworks, contents of urban ecological risk assessment were reviewed in terms of driven forces, risk resources, risk receptors, endpoints and integrated approaches for risk assessment. It was suggested that types and degrees of urban economical and social activities were the driven forces for urban ecological risks. Ecological functional components at different levels in urban ecosystems as well as the urban system as a whole were the risk receptors. Assessment endpoints involved in changes of urban ecological structures, processes, functional components and the integrity of characteristic and function. Social-ecological models should be the major approaches for urban ecological risk assessment. Trends for urban ecological risk assessment study should focus on setting a definite protection target and criteria corresponding to assessment endpoints, establishing a multiple-parameter assessment system and integrative assessment approaches.

  9. Taking the Risk Out of Risk Assessment

    Science.gov (United States)

    2005-01-01

    The ability to understand risks and have the right strategies in place when risky events occur is essential in the workplace. More and more organizations are being confronted with concerns over how to measure their risks or what kind of risks they can take when certain events transpire that could have a negative impact. NASA is one organization that faces these challenges on a daily basis, as effective risk management is critical to the success of its missions especially the Space Shuttle missions. On July 29, 1996, former NASA Administrator Daniel Goldin charged NASA s Office of Safety and Mission Assurance with developing a probabilistic risk assessment (PRA) tool to support decisions on the funding of Space Shuttle upgrades. When issuing the directive, Goldin said, "Since I came to NASA [in 1992], we've spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk." Work on the PRA tool began immediately. The resulting prototype, the Quantitative Risk Assessment System (QRAS) Version 1.0, was jointly developed by NASA s Marshall Space Flight Center, its Office of Safety and Mission Assurance, and researchers at the University of Maryland. QRAS software automatically expands the reliability logic models of systems to evaluate the probability of highly detrimental outcomes occurring in complex systems that are subject to potential accident scenarios. Even in its earliest forms, QRAS was used to begin PRA modeling of the Space Shuttle. In parallel, the development of QRAS continued, with the goal of making it a world-class tool, one that was especially suited to NASA s unique needs. From the beginning, an important conceptual goal in the development of QRAS was for it to help bridge the gap between the professional risk analyst and the design engineer. In the past, only the professional risk analyst could perform, modify, use, and perhaps even adequately understand PRA. NASA wanted

  10. [Forensic assessment of violence risk].

    Science.gov (United States)

    Pujol Robinat, Amadeo; Mohíno Justes, Susana; Gómez-Durán, Esperanza L

    2014-03-01

    Over the last 20 years there have been steps forward in the field of scientific research on prediction and handling different violent behaviors. In this work we go over the classic concept of "criminal dangerousness" and the more current of "violence risk assessment". We analyze the evolution of such assessment from the practice of non-structured clinical expert opinion to current actuarial methods and structured clinical expert opinion. Next we approach the problem of assessing physical violence risk analyzing the HCR-20 (Assessing Risk for Violence) and we also review the classic and complex subject of the relation between mental disease and violence. One of the most problematic types of violence, difficult to assess and predict, is sexual violence. We study the different actuarial and sexual violence risk prediction instruments and in the end we advise an integral approach to the problem. We also go through partner violence risk assessment, describing the most frequently used scales, especially SARA (Spouse Assault Risk Assessment) and EPV-R. Finally we give practical advice on risk assessment, emphasizing the importance of having maximum information about the case, carrying out a clinical examination, psychopathologic exploration and the application of one of the described risk assessment scales. We'll have to express an opinion about the dangerousness/risk of future violence from the subject and some recommendations on the conduct to follow and the most advisable treatment. Copyright © 2014 Elsevier España, S.L. All rights reserved.

  11. Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

    Science.gov (United States)

    Stamatelatos,Michael; Dezfuli, Homayoon; Apostolakis, George; Everline, Chester; Guarro, Sergio; Mathias, Donovan; Mosleh, Ali; Paulos, Todd; Riha, David; Smith, Curtis; hide

    2011-01-01

    Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was

  12. An introductory guide to uncertainty analysis in environmental and health risk assessment

    International Nuclear Information System (INIS)

    Hoffman, F.O.; Hammonds, J.S.

    1992-10-01

    To compensate for the potential for overly conservative estimates of risk using standard US Environmental Protection Agency methods, an uncertainty analysis should be performed as an integral part of each risk assessment. Uncertainty analyses allow one to obtain quantitative results in the form of confidence intervals that will aid in decision making and will provide guidance for the acquisition of additional data. To perform an uncertainty analysis, one must frequently rely on subjective judgment in the absence of data to estimate the range and a probability distribution describing the extent of uncertainty about a true but unknown value for each parameter of interest. This information is formulated from professional judgment based on an extensive review of literature, analysis of the data, and interviews with experts. Various analytical and numerical techniques are available to allow statistical propagation of the uncertainty in the model parameters to a statement of uncertainty in the risk to a potentially exposed individual. Although analytical methods may be straightforward for relatively simple models, they rapidly become complicated for more involved risk assessments. Because of the tedious efforts required to mathematically derive analytical approaches to propagate uncertainty in complicated risk assessments, numerical methods such as Monte Carlo simulation should be employed. The primary objective of this report is to provide an introductory guide for performing uncertainty analysis in risk assessments being performed for Superfund sites

  13. Agent-Based Modelling for Security Risk Assessment

    NARCIS (Netherlands)

    Janssen, S.A.M.; Sharpans'kykh, Alexei; Bajo, J.; Vale, Z.; Hallenborg, K.; Rocha, A.P.; Mathieu, P.; Pawlewski, P.; Del Val, E.; Novais, P.; Lopes, F.; Duque Méndez, N.D.; Julián, V.; Holmgren, J.

    2017-01-01

    Security Risk Assessment is commonly performed by using traditional methods based on linear probabilistic tools and informal expert judgements. These methods lack the capability to take the inherent dynamic and intelligent nature of attackers into account. To partially address the limitations,

  14. Risk Assessment and Integration Team (RAIT) Portfolio Risk Analysis Strategy

    Science.gov (United States)

    Edwards, Michelle

    2010-01-01

    Impact at management level: Qualitative assessment of risk criticality in conjunction with risk consequence, likelihood, and severity enable development of an "investment policy" towards managing a portfolio of risks. Impact at research level: Quantitative risk assessments enable researchers to develop risk mitigation strategies with meaningful risk reduction results. Quantitative assessment approach provides useful risk mitigation information.

  15. General approaches to the risk assessment of chemicals

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, Patrick [Commission of the European Communities, Directorate General XI, Environment, Nuclear Safety and Civil Protection (Belgium)

    1992-07-01

    In the context of the UNCED 92 'Earth Summit' in Rio, the following definition of chemical risk assessment has been developed: 'Chemical risk assessment is a scientific process that identifies and quantifies the potential adverse effects on human health or ecosystems of defined exposures to chemical substances, to mixtures that include chemicals, or to chemically hazardous processes or situations. Risk itself is the probability of the occurrence of a defined adverse effect in a defined group and in defined circumstances'. I would not be so impertinent as to try and improve upon a definition that has the tacit endorsement of the majority of world-leaders. Furthermore, I consider that too many man-years have been spent discussing this topic. Thankfully the UNCED definition recognises chemical risk assessment as being a process and not some immutable physical law. In this presentation I will attempt to explain some of the details and mechanisms of that process but first of all it is worthwhile to spend a few moments putting chemical risk assessment in its proper context and asking the simple question: why do we want/need to assess the potential risk of chemicals?. In general terms, chemicals risk assessment is carried out in order to ensure that neither man (consumer/worker/general public) nor the environment are exposed to unacceptable risks arising from the production, use and disposal of chemicals. At a national and/or international level, risk assessments are performed by the regulatory authorities before they accept notification dossiers (e.g. new industrial chemicals) or grant authorizations (e.g. pharmaceuticals, pesticides, cosmetics, food additives). At the local level, plant-operators must carry out risk assessments to ensure that in the particular circumstances of their factory the workers are adequately protected and that satisfactory accident prevention and contingency plans are prepared. Similarly, local authorities must carry out risk assessments before

  16. General approaches to the risk assessment of chemicals

    International Nuclear Information System (INIS)

    Murphy, Patrick

    1992-01-01

    In the context of the UNCED 92 'Earth Summit' in Rio, the following definition of chemical risk assessment has been developed: 'Chemical risk assessment is a scientific process that identifies and quantifies the potential adverse effects on human health or ecosystems of defined exposures to chemical substances, to mixtures that include chemicals, or to chemically hazardous processes or situations. Risk itself is the probability of the occurrence of a defined adverse effect in a defined group and in defined circumstances'. I would not be so impertinent as to try and improve upon a definition that has the tacit endorsement of the majority of world-leaders. Furthermore, I consider that too many man-years have been spent discussing this topic. Thankfully the UNCED definition recognises chemical risk assessment as being a process and not some immutable physical law. In this presentation I will attempt to explain some of the details and mechanisms of that process but first of all it is worthwhile to spend a few moments putting chemical risk assessment in its proper context and asking the simple question: why do we want/need to assess the potential risk of chemicals?. In general terms, chemicals risk assessment is carried out in order to ensure that neither man (consumer/worker/general public) nor the environment are exposed to unacceptable risks arising from the production, use and disposal of chemicals. At a national and/or international level, risk assessments are performed by the regulatory authorities before they accept notification dossiers (e.g. new industrial chemicals) or grant authorizations (e.g. pharmaceuticals, pesticides, cosmetics, food additives). At the local level, plant-operators must carry out risk assessments to ensure that in the particular circumstances of their factory the workers are adequately protected and that satisfactory accident prevention and contingency plans are prepared. Similarly, local authorities must carry out risk assessments before

  17. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  18. Principal elements of the Basalt Waste Isolation Project performance assessment studies

    International Nuclear Information System (INIS)

    Baca, R.G.; Wilde, R.T.

    1983-12-01

    In this paper, three of the principal elements of the Basalt Waste Isolation Project (BWIP) performance assessment studies are focused on: (1) development of a methodology for probabilistic risk assessment, (2) performance analyses of repository subsystems, and (3) selection and ranking of disruptive event scenarios. Other elements of the BWIP performance assessment studies are briefly outlined. 12 references, 5 figures

  19. Systematic assessment of environmental risk factors for bipolar disorder

    DEFF Research Database (Denmark)

    Bortolato, Beatrice; Köhler, Cristiano A.; Evangelou, Evangelos

    2017-01-01

    factors supported by high epidemiological credibility. Methods: We searched the Pubmed/MEDLINE, EMBASE and PsycInfo databases up to 7 October 2016 to identify systematic reviews and meta-analyses of observational studies that assessed associations between putative environmental risk factors and BD......Objectives: The pathophysiology of bipolar disorder is likely to involve both genetic and environmental risk factors. In our study, we aimed to perform a systematic search of environmental risk factors for BD. In addition, we assessed possible hints of bias in this literature, and identified risk...... met the inclusion criteria (seven meta-analyses and nine qualitative systematic reviews). Fifty-one unique environmental risk factors for BD were evaluated. Six meta-analyses investigated associations with a risk factor for BD. Only irritable bowel syndrome (IBS) emerged as a risk factor for BD...

  20. Risk assessment approach for Rokkasho reprocessing plant

    International Nuclear Information System (INIS)

    Ootou, Y.; Tamauchi, Y.; Hayashi, Y.; Takebe, K.; Miyata, T.

    2006-01-01

    for various types of equipment and piping and for operations performed by operators, and was obtained through sensitivity analysis, such as the influence of change in the maintenance periods of the occurrence frequency. This information might be of use for operation management. On the other hand, in order to have grasp of the risk profile at a reprocessing plant and in order for us to make good use of the risk information, it is also necessary to conduct risk assessments for incidents other than major accidents. Since it is appropriate to use a Graded Approach to assess the risks of such a large number of incidents effectively and efficiently, a simplified method, called ''improved risk index method'' was developed. It based on the Risk Index Method recommended by U.S. NRC. The Risk Index Method is simple and is appropriate for fuel cycle facilities where a wide variety of accidents may occur, but it is characterized by the fact that it requires engineering judgments by analysts when assessing the occurrence frequency, and the common components between the safety measures (the subordinacy) are difficult to clarify. In order to solve the problems inherent in the Risk Index Method, quantification, flexibility and traceability have been improved while maintaining its advantages. Currently, risk assessments for a wide variety of incidents and accidents are being conducted using the above mentioned methods and their results will be used for the improvement of operation management. Furthermore, risk assessments for external incidents (earthquakes, etc.) are being planned

  1. Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

    Science.gov (United States)

    Lee, Lydia L.; Ingegneri, Antonino J.; Djam, Melody

    2006-01-01

    The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor

  2. Probabilistic Approaches for Multi-Hazard Risk Assessment of Structures and Systems

    Science.gov (United States)

    Kwag, Shinyoung

    Performance assessment of structures, systems, and components for multi-hazard scenarios has received significant attention in recent years. However, the concept of multi-hazard analysis is quite broad in nature and the focus of existing literature varies across a wide range of problems. In some cases, such studies focus on hazards that either occur simultaneously or are closely correlated with each other. For example, seismically induced flooding or seismically induced fires. In other cases, multi-hazard studies relate to hazards that are not dependent or correlated but have strong likelihood of occurrence at different times during the lifetime of a structure. The current approaches for risk assessment need enhancement to account for multi-hazard risks. It must be able to account for uncertainty propagation in a systems-level analysis, consider correlation among events or failure modes, and allow integration of newly available information from continually evolving simulation models, experimental observations, and field measurements. This dissertation presents a detailed study that proposes enhancements by incorporating Bayesian networks and Bayesian updating within a performance-based probabilistic framework. The performance-based framework allows propagation of risk as well as uncertainties in the risk estimates within a systems analysis. Unlike conventional risk assessment techniques such as a fault-tree analysis, a Bayesian network can account for statistical dependencies and correlations among events/hazards. The proposed approach is extended to develop a risk-informed framework for quantitative validation and verification of high fidelity system-level simulation tools. Validation of such simulations can be quite formidable within the context of a multi-hazard risk assessment in nuclear power plants. The efficiency of this approach lies in identification of critical events, components, and systems that contribute to the overall risk. Validation of any event or

  3. Route assessment using comparative risk factors integrated through a GIS

    International Nuclear Information System (INIS)

    Toth, D.M.; O'Connell, W.J.

    1996-01-01

    The assessment of potential alternative routes for the shipment of spent nuclear fuel was simplified through the use of comparative risk factors evaluated using detailed route and environmental attributes. The route characteristics, integrated into risk measures, vary strongly with location and were developed from national, state, and local sources. The route data and evaluation were managed using a geographic information system (GIS). An assessment of four real North Florida routes was performed and an interstate highway route exhibited the lowest risk based on the application of the risk factors

  4. System Analysis and Risk Assessment system (SARA) Version 4.0

    International Nuclear Information System (INIS)

    Sattison, M.B.; Russell, K.D.; Skinner, N.L.

    1992-01-01

    This NUREG is the tutorial for the System Analysis and Risk Assessment System (SARA) Version 4.0, a microcomputer-based system used to analyze the safety issues of a family [i.e., a power plant, a manufacturing facility, any facility on which a probabilistic risk assessment (PRA) might be performed]. A series of lessons are provided that walk the user through some basic steps common to most analyses performed with SARA. The example problems presented in the lessons build on one another, and in combination, lead the user through all aspects of SARA sensitivity analysis

  5. Patient caries risk assessment

    DEFF Research Database (Denmark)

    Twetman, Svante; Fontana, Margherita

    2009-01-01

    Risk assessment is an essential component in the decision-making process for the correct prevention and management of dental caries. Multiple risk factors and indicators have been proposed as targets in the assessment of risk of future disease, varying sometimes based on the age group at which...... they are targeted. Multiple reviews and systematic reviews are available in the literature on this topic. This chapter focusses primarily on results of reviews based on longitudinal studies required to establish the accuracy of caries risk assessment. These findings demonstrate that there is a strong body...... of evidence to support that caries experience is still, unfortunately, the single best predictor for future caries development. In young children, prediction models which include a variety of risk factors seem to increase the accuracy of the prediction, while the usefulness of additional risk factors...

  6. Risk assessment of climate systems for national security.

    Energy Technology Data Exchange (ETDEWEB)

    Backus, George A.; Boslough, Mark Bruce Elrick; Brown, Theresa Jean; Cai, Ximing; Conrad, Stephen Hamilton; Constantine, Paul G; Dalbey, Keith R.; Debusschere, Bert J.; Fields, Richard; Hart, David Blaine; Kalinina, Elena Arkadievna; Kerstein, Alan R.; Levy, Michael; Lowry, Thomas Stephen; Malczynski, Leonard A.; Najm, Habib N.; Overfelt, James Robert; Parks, Mancel Jordan; Peplinski, William J.; Safta, Cosmin; Sargsyan, Khachik; Stubblefield, William Anthony; Taylor, Mark A.; Tidwell, Vincent Carroll; Trucano, Timothy Guy; Villa, Daniel L.

    2012-10-01

    Climate change, through drought, flooding, storms, heat waves, and melting Arctic ice, affects the production and flow of resource within and among geographical regions. The interactions among governments, populations, and sectors of the economy require integrated assessment based on risk, through uncertainty quantification (UQ). This project evaluated the capabilities with Sandia National Laboratories to perform such integrated analyses, as they relate to (inter)national security. The combining of the UQ results from climate models with hydrological and economic/infrastructure impact modeling appears to offer the best capability for national security risk assessments.

  7. Site remediation guided by risk assessment

    International Nuclear Information System (INIS)

    McBean, E.A.; Gowing, A.; Pieczonka, G.

    2002-01-01

    'Full text:' Risk assessment (RA) provides an effective tool for identifying hazards with respect to human health and ecological receptors, hazards that arise from contaminants in the environment. Risk assessment relies upon: hazard identification/problem formulation; toxicity assessment; exposure assessment; and risk characterization. Hence, risk assessment provides an effective guide for site remediation through the identification of the associated risks arising from pre- and potential post-remediation activities. As a demonstration of this decision-making process, a site-specific risk assessment (SSRA) was performed on a chemical producing facility. Historical waste practices during the production of DDT compounds resulted in impacted site soils and sediment and soils of the creek passing through the facility. The purpose of the SSRA was to derive site-specific cleanup values for the impacted on-site soils, creek sediments, and embankment soils, incorporating human and ecological receptors associated with the environmental media. The human exposure pathways considered were dermal contact, incidental ingestion, and inhalation of the various soils. The potential human receptors were industrial workers, construction workers, trespassers, and off-site residents. Ingestion of fish from the creek by residents was also evaluated in the human health risk assessment (HHRA). Food web analyses were used to evaluate the impact of exposure to chemical compounds in aquatic sediments and related soils by ecological receptors such as the great blue heron, raccoon, and mink. The SSRA involved modelling the daily chemical intake by receptors and the transfer of chemicals to identified secondary media (e.g., ambient air or animal tissues) that are also potential exposure media. These models, while using the site-specific chemical data in the source media, possess uncertainties associated with default parameters that are only approximations and not site-specific (e.g., soil

  8. Risk Assessment Stability: A Revalidation Study of the Arizona Risk/Needs Assessment Instrument

    Science.gov (United States)

    Schwalbe, Craig S.

    2009-01-01

    The actuarial method is the gold standard for risk assessment in child welfare, juvenile justice, and criminal justice. It produces risk classifications that are highly predictive and that may be robust to sampling error. This article reports a revalidation study of the Arizona Risk/Needs Assessment instrument, an actuarial instrument for juvenile…

  9. An economic assessment of population health risk in region

    Directory of Open Access Journals (Sweden)

    Nina Vladimirovna Zaytseva

    2012-06-01

    Full Text Available This paper proposes a method of economic assessment of population health risk as a tool of life qualitymanagement and qualityof labor resources in the region (as factors of a region’s economic security. The technique is based on the cost of reducing the period of disability in the implementation of population health risk and takes into account the effects of risk prevention on levels of the budgetary system of the Russian Federation. The method intends to support making decisions on planning measures to reduce population health risk at the level of regions, territories and separate objects to assess their cost-performance, optimization of investment and operating costs to reduce the population health risk and sustainable development of the territory

  10. Communicating Performance Assessments Results - 13609

    Energy Technology Data Exchange (ETDEWEB)

    Layton, Mark [Savannah River Remediation LLC, Building 705-1C, Aiken, SC 29808 (United States)

    2013-07-01

    The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is

  11. Communicating Performance Assessments Results - 13609

    International Nuclear Information System (INIS)

    Layton, Mark

    2013-01-01

    The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is

  12. Power performance assessment. Final report

    International Nuclear Information System (INIS)

    Frandsen, S.

    1998-12-01

    In the increasingly commercialised wind power marketplace, the lack of precise assessment methods for the output of an investment is becoming a barrier for wider penetration of wind power. Thus, addressing this problem, the overall objectives of the project are to reduce the financial risk in investment in wind power projects by significantly improving the power performance assessment methods. Ultimately, if this objective is successfully met, the project may also result in improved tuning of the individual wind turbines and in optimisation methods for wind farm operation. The immediate, measurable objectives of the project are: To prepare a review of existing contractual aspects of power performance verification procedures of wind farms; to provide information on production sensitivity to specific terrain characteristics and wind turbine parameters by analyses of a larger number of wind farm power performance data available to the proposers; to improve the understanding of the physical parameters connected to power performance in complex environment by comparing real-life wind farm power performance data with 3D computational flow models and 3D-turbulence wind turbine models; to develop the statistical framework including uncertainty analysis for power performance assessment in complex environments; and to propose one or more procedures for power performance evaluation of wind power plants in complex environments to be applied in contractual agreements between purchasers and manufacturers on production warranties. Although the focus in this project is on power performance assessment the possible results will also be of benefit to energy yield forecasting, since the two tasks are strongly related. (au) JOULE III. 66 refs.; In Co-operation Renewable Energy System Ltd. (GB); Centre for Renewable Energy (GR); Aeronautic Research Centre (SE); National Engineering Lab. (GB); Public Power Cooperation (GR)

  13. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  14. Safety analysis and risk assessment handbook

    International Nuclear Information System (INIS)

    Peterson, V.L.; Colwell, R.G.; Dickey, R.L.

    1997-01-01

    This Safety Analysis and Risk Assessment Handbook (SARAH) provides guidance to the safety analyst at the Rocky Flats Environmental Technology Site (RFETS) in the preparation of safety analyses and risk assessments. Although the older guidance (the Rocky Flats Risk Assessment Guide) continues to be used for updating the Final Safety Analysis Reports developed in the mid-1980s, this new guidance is used with all new authorization basis documents. With the mission change at RFETS came the need to establish new authorization basis documents for its facilities, whose functions had changed. The methodology and databases for performing the evaluations that support the new authorization basis documents had to be standardized, to avoid the use of different approaches and/or databases for similar accidents in different facilities. This handbook presents this new standardized approach. The handbook begins with a discussion of the requirements of the different types of authorization basis documents and how to choose the one appropriate for the facility to be evaluated. It then walks the analyst through the process of identifying all the potential hazards in the facility, classifying them, and choosing the ones that need to be analyzed further. It then discusses the methods for evaluating accident initiation and progression and covers the basic steps in a safety analysis, including consequence and frequency binning and risk ranking. The handbook lays out standardized approaches for determining the source terms of the various accidents (including airborne release fractions, leakpath factors, etc.), the atmospheric dispersion factors appropriate for Rocky Flats, and the methods for radiological and chemical consequence assessments. The radiological assessments use a radiological open-quotes templateclose quotes, a spreadsheet that incorporates the standard values of parameters, whereas the chemical assessments use the standard codes ARCHIE and ALOHA

  15. Availability and use of medical isotopes in Canada : performed as part of a radiological terrorism risk assessment. Technical memorandum

    International Nuclear Information System (INIS)

    Larsson, C.L.

    2004-12-01

    An assessment of the availability of radioactive material used for medical applications in Canada has been performed as part of the CBRN Research and Technology Initiative (CRTI) Project CRTI-02-0024RD (Probabilistic Risk Assessment Tool for Radiological Dispersal Devices). A general list of medical radioisotopes used worldwide was compiled via literature searches and Internet investigations. This list was then compared to all isotopes licenced to healthcare facilities in Canada. Sources of lesser concern for this study, such as noble gases, short-lived isotopes, and radioisotopes not licenced for medical applications in Canada, were eliminated. The remaining sources were then analysed for frequency of use and maximum licenced activity to assess which materials would be of highest concern in relation to radiological terrorism. A detailed description of the application, typical administered activity, and other relevant information for these most common and highest licenced activity medical sources was assembled to feed directly into the risk assessment database. A general discussion of security in healthcare facilities is also given. Due to the constant advances made in medicine, the information relating to licenced isotopes is dynamic and thus requires updating to ensure the database is kept current. (author)

  16. Microbiological risk assessment for personal care products.

    Science.gov (United States)

    Stewart, S E; Parker, M D; Amézquita, A; Pitt, T L

    2016-12-01

    Regulatory decisions regarding microbiological safety of cosmetics and personal care products are primarily hazard-based, where the presence of a potential pathogen determines decision-making. This contrasts with the Food industry where it is a commonplace to use a risk-based approach for ensuring microbiological safety. A risk-based approach allows consideration of the degree of exposure to assess unacceptable health risks. As there can be a number of advantages in using a risk-based approach to safety, this study explores the Codex Alimentarius (Codex) four-step Microbiological Risk Assessment (MRA) framework frequently used in the Food industry and examines how it can be applied to the safety assessment of personal care products. The hazard identification and hazard characterization steps (one and two) of the Codex MRA framework consider the main microorganisms of concern. These are addressed by reviewing the current industry guidelines for objectionable organisms and analysing reports of contaminated products notified by government agencies over a recent 5-year period, together with examples of reported outbreaks. Data related to estimation of exposure (step three) are discussed, and examples of possible calculations and references are included. The fourth step, performed by the risk assessor (risk characterization), is specific to each assessment and brings together the information from the first three steps to assess the risk. Although there are very few documented uses of the MRA approach for personal care products, this study illustrates that it is a practicable and sound approach for producing products that are safe by design. It can be helpful in the context of designing products and processes going to market and with setting of microbiological specifications. Additionally, it can be applied reactively to facilitate decision-making when contaminated products are released on to the marketplace. Currently, the knowledge available may only allow a

  17. Security Risk Assessment Process for UAS in the NAS CNPC Architecture

    Science.gov (United States)

    Iannicca, Dennis Christopher; Young, Daniel Paul; Suresh, Thadhani; Winter, Gilbert A.

    2013-01-01

    This informational paper discusses the risk assessment process conducted to analyze Control and Non-Payload Communications (CNPC) architectures for integrating civil Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). The assessment employs the National Institute of Standards and Technology (NIST) Risk Management framework to identify threats, vulnerabilities, and risks to these architectures and recommends corresponding mitigating security controls. This process builds upon earlier work performed by RTCA Special Committee (SC) 203 and the Federal Aviation Administration (FAA) to roadmap the risk assessment methodology and to identify categories of information security risks that pose a significant impact to aeronautical communications systems. A description of the deviations from the typical process is described in regards to this aeronautical communications system. Due to the sensitive nature of the information, data resulting from the risk assessment pertaining to threats, vulnerabilities, and risks is beyond the scope of this paper

  18. Optimising the remediation of sites contaminated by the Wismut uranium mining operations using performance and risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Pelz, F.; Jakubick, A.Th.; Kahnt, R. [Wismut GmbH, Chemnitz (Germany)

    2003-07-01

    The cost and risk assessment at Wismut GmbH is performed for optimising the remediation of sites contaminated by uranium mining and milling. An iterative either probabilistic or deterministic 'top-down' model of the remediation project as an integrated system is used. Initially all relevant processes are captured in a rather abstract and simplistic way. In the course of the model development those variables and processes to which results have been shown to be sensitive are described in more detail. This approach is useful for identifying any gaps in the knowledge base that have to be filled in the course of the multi-attributive decision making. The requirement for optimisation, also with respect to socio-economic impacts, is met by including other variables in addition to costs and health risks. (authors)

  19. Optimising the remediation of sites contaminated by the Wismut uranium mining operations using performance and risk assessment

    International Nuclear Information System (INIS)

    Pelz, F.; Jakubick, A.Th.; Kahnt, R.

    2003-01-01

    The cost and risk assessment at Wismut GmbH is performed for optimising the remediation of sites contaminated by uranium mining and milling. An iterative either probabilistic or deterministic 'top-down' model of the remediation project as an integrated system is used. Initially all relevant processes are captured in a rather abstract and simplistic way. In the course of the model development those variables and processes to which results have been shown to be sensitive are described in more detail. This approach is useful for identifying any gaps in the knowledge base that have to be filled in the course of the multi-attributive decision making. The requirement for optimisation, also with respect to socio-economic impacts, is met by including other variables in addition to costs and health risks. (authors)

  20. Risk assessment: 'A consumer's perspective'

    International Nuclear Information System (INIS)

    Waterhouse, Rachel

    1992-01-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered

  1. Risk assessment: 'A consumer's perspective'

    Energy Technology Data Exchange (ETDEWEB)

    Waterhouse, Rachel [Consumer' s Association, Health and Safety Commission (United Kingdom)

    1992-07-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered.

  2. Reinforcement of qualitative risk assessment proposals from computer science

    International Nuclear Information System (INIS)

    Friedlhuber, T.; Hibti, M.; Rauzy, A.

    2013-01-01

    During the last decade a lot of research has been made to evaluate concepts and methos of quantitative risk assessment in order to predict hazards more precisely. Nevertheless, the occurrence of new catastrophes like the Indonesian Tsunami in 2004, the Deepwater Horizon accident in 2010 or recently the Fukushima accidents in 2011 raise the question whether we may underestimate some natural limits of annotative risk assessment or even mistake its significance. Especially in the case of very unlikely events, in combination with uncertainty and severe consequences, may be we would do better to concentrate more on understanding risk than on calculating probability values. In this paper we apply progresses, made in the field of computer science, to tools and modelling concepts used in risk assessment. Regarding computer science, we point out now concepts, that may improve the quality of risk models and the process of model engineering. The goal is to reinforce the importance of qualitative risk assessment with the help of sophisticated tools and modelling. Qualitative risk assessment aims to understand risk and therefore reflects the initial idea of risk assessment. Risk understanding requires understanding systems and relations of components. It is fundamental to comprehend the meaning of components in fault- and event trees, to retrace all applied modifications and to highlight critical aspects. It is important how PSA models are visualized, documented, navigated, how results are presented and how model maintenance, integration and version control are performed. Also, the conjoint usage of different type of models (for example PSA models together with event sequence diagrams) can contribute to quality assurance. We present new concepts for various kind of problems. (author)

  3. PRA (Probabilistic Risk Assessments) Participation versus Validation

    Science.gov (United States)

    DeMott, Diana; Banke, Richard

    2013-01-01

    Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

  4. Heuristics structure and pervade formal risk assessment.

    Science.gov (United States)

    MacGillivray, Brian H

    2014-04-01

    Lay perceptions of risk appear rooted more in heuristics than in reason. A major concern of the risk regulation literature is that such "error-strewn" perceptions may be replicated in policy, as governments respond to the (mis)fears of the citizenry. This has led many to advocate a relatively technocratic approach to regulating risk, characterized by high reliance on formal risk and cost-benefit analysis. However, through two studies of chemicals regulation, we show that the formal assessment of risk is pervaded by its own set of heuristics. These include rules to categorize potential threats, define what constitutes valid data, guide causal inference, and to select and apply formal models. Some of these heuristics lay claim to theoretical or empirical justifications, others are more back-of-the-envelope calculations, while still more purport not to reflect some truth but simply to constrain discretion or perform a desk-clearing function. These heuristics can be understood as a way of authenticating or formalizing risk assessment as a scientific practice, representing a series of rules for bounding problems, collecting data, and interpreting evidence (a methodology). Heuristics are indispensable elements of induction. And so they are not problematic per se, but they can become so when treated as laws rather than as contingent and provisional rules. Pitfalls include the potential for systematic error, masking uncertainties, strategic manipulation, and entrenchment. Our central claim is that by studying the rules of risk assessment qua rules, we develop a novel representation of the methods, conventions, and biases of the prior art. © 2013 Society for Risk Analysis.

  5. Using risk assessment in periodontics.

    Science.gov (United States)

    Woodman, Alan J

    2014-08-01

    Risk assessment has become a regular feature in both dental practice and society as a whole, and principles used to assess risk in society are similar to those used in a clinical setting. Although the concept of risk assessment as a prognostic indicator for periodontal disease incidence and activity is well established in the management of periodontitis, the use of risk assessment to manage the practical treatment of periodontitis and its sequelae appears to have less foundation. A simple system of initial risk assessment - building on the use of the Basic Periodontal Examination (BPE), clinical, medical and social factors - is described, linked to protocols for delivering care suited to general dental practice and stressing the role of long-term supportive care. The risks of not treating the patient are considered, together with the possible causes of failure, and the problems of successful treatment are illustrated by the practical management of post-treatment recession.

  6. World-wide risk assessment of the transportation of radioactive materials

    International Nuclear Information System (INIS)

    Ericsson, A.M.; Elert, M.

    1983-01-01

    The aim of the project reported in this paper is to develop the means and methods for a risk analysis of the transportation of radioactive materials throughout the world. The project was initiated by the Standing Advisory Group on the Safe Transport of Radioactive Materials (SAGSTRAM) of the IAEA. In 1979 the Swedish Nuclear Power Inspectorate and the IAEA signed an agreement on the development of a model for calculation of the transport risk. Member States of the IAEA are invited to use the model for a risk assessment of the transportation of radioactive materials in their own country. These assessments will be collected and analyzed and a world-wide risk assessment performed. The IAEA has the overall responsibility for the project and administers it. Sweden manages the project and has performed the applied research with the assistance of research support groups which have supplied data and analyses and performed some other parts of the project. An Oversight Committee with participants from eight Member States has reviewed the progress and has given valuable recommendations. It was important that the model had the sophistication and flexibility required for its use by all Member States but still was easy to handle. The risk calculations are performed by the computer code INTERTRAN which is based on the American computer code RADTRAN II developed by Sandia National Laboratories, Albuquerque, NM. The methodology of the RADTRAN II as well as data and format of the input and output was changed to make the code more internationally oriented. 2 references

  7. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components.

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    Full Text Available The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such "indirect risks" can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their "at-risk status" designations. Risk assessments are not a replacement for impact assessments, but-by considering the potential for indirect risks as we demonstrate here-they offer a crucial complementary perspective for the management of ecosystems and the organisms within.

  8. 24 CFR 35.315 - Risk assessment.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Risk assessment. 35.315 Section 35... Provided by a Federal Agency Other Than HUD § 35.315 Risk assessment. Each owner shall complete a risk assessment in accordance with 40 CFR 745.227(d). Each risk assessment shall be completed in accordance with...

  9. Guidance for treatment of variability and uncertainty in ecological risk assessments of contaminated sites

    International Nuclear Information System (INIS)

    1998-06-01

    Uncertainty is a seemingly simple concept that has caused great confusion and conflict in the field of risk assessment. This report offers guidance for the analysis and presentation of variability and uncertainty in ecological risk assessments, an important issue in the remedial investigation and feasibility study processes. This report discusses concepts of probability in terms of variance and uncertainty, describes how these concepts differ in ecological risk assessment from human health risk assessment, and describes probabilistic aspects of specific ecological risk assessment techniques. The report ends with 17 points to consider in performing an uncertainty analysis for an ecological risk assessment of a contaminated site

  10. Exploring the uncertainties in cancer risk assessment using the integrated probabilistic risk assessment (IPRA) approach.

    Science.gov (United States)

    Slob, Wout; Bakker, Martine I; Biesebeek, Jan Dirk Te; Bokkers, Bas G H

    2014-08-01

    Current methods for cancer risk assessment result in single values, without any quantitative information on the uncertainties in these values. Therefore, single risk values could easily be overinterpreted. In this study, we discuss a full probabilistic cancer risk assessment approach in which all the generally recognized uncertainties in both exposure and hazard assessment are quantitatively characterized and probabilistically evaluated, resulting in a confidence interval for the final risk estimate. The methodology is applied to three example chemicals (aflatoxin, N-nitrosodimethylamine, and methyleugenol). These examples illustrate that the uncertainty in a cancer risk estimate may be huge, making single value estimates of cancer risk meaningless. Further, a risk based on linear extrapolation tends to be lower than the upper 95% confidence limit of a probabilistic risk estimate, and in that sense it is not conservative. Our conceptual analysis showed that there are two possible basic approaches for cancer risk assessment, depending on the interpretation of the dose-incidence data measured in animals. However, it remains unclear which of the two interpretations is the more adequate one, adding an additional uncertainty to the already huge confidence intervals for cancer risk estimates. © 2014 Society for Risk Analysis.

  11. Aquatic risk assessment of the new rice herbicide profoxydim

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, Paloma [Laboratory for Ecotoxicology, Department of the Environment, INIA, Crta De La Coruna Km 7, 28040 Madrid (Spain)]. E-mail: arguello@inia.es; Kubitza, Johanna [BASF-AG, Agricultural Center Limburgerhof, P.O. Box 120, D-67114 Limburgerhof (Germany); Peter Dohmen, G. [BASF-AG, Agricultural Center Limburgerhof, P.O. Box 120, D-67114 Limburgerhof (Germany); Tarazona, Jose V. [Laboratory for Ecotoxicology, Department of the Environment, INIA, Crta De La Coruna Km 7, 28040 Madrid (Spain)

    2006-07-15

    A tiered protocol for assessing ecological risks has been applied to the rice pesticide profoxydim. The initial assessment (Tier I) was based on toxicity exposure ratio (TER) calculations based on laboratory data using a worst-case rice scenario. The first refinement (Tier II) was based on direct toxicity assessment (DTA) of water samples collected during a field-mesocosm study. Finally, a higher-tier assessment on the in situ assessment of paddy community responses (field-mesocosm-Tier III) was performed. A successive application of three pesticides, the herbicides azimsulfuron, propanil and the insecticide malathion, was used as reference controls. The refined assessments indicated a lower risk than that predicted from TER estimations. DTA-based Tier II showed toxicity effects only for concentrations above the recommended dose of profoxydim. Effects for reference controls were observed in DTA which were not expected from Tier I. The field-mesocosm study confirmed these effects but also showed that they were transient and of low relevance. - Risk refinement assessment of rice pesticides starting with DTA and moving to community studies is a cost-effective approach, only if required.

  12. Aquatic risk assessment of the new rice herbicide profoxydim

    International Nuclear Information System (INIS)

    Sanchez, Paloma; Kubitza, Johanna; Peter Dohmen, G.; Tarazona, Jose V.

    2006-01-01

    A tiered protocol for assessing ecological risks has been applied to the rice pesticide profoxydim. The initial assessment (Tier I) was based on toxicity exposure ratio (TER) calculations based on laboratory data using a worst-case rice scenario. The first refinement (Tier II) was based on direct toxicity assessment (DTA) of water samples collected during a field-mesocosm study. Finally, a higher-tier assessment on the in situ assessment of paddy community responses (field-mesocosm-Tier III) was performed. A successive application of three pesticides, the herbicides azimsulfuron, propanil and the insecticide malathion, was used as reference controls. The refined assessments indicated a lower risk than that predicted from TER estimations. DTA-based Tier II showed toxicity effects only for concentrations above the recommended dose of profoxydim. Effects for reference controls were observed in DTA which were not expected from Tier I. The field-mesocosm study confirmed these effects but also showed that they were transient and of low relevance. - Risk refinement assessment of rice pesticides starting with DTA and moving to community studies is a cost-effective approach, only if required

  13. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  14. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components

    Science.gov (United States)

    Mach, Megan E.; Martone, Rebecca G.; Singh, Gerald G.; O, Miriam; Chan, Kai M. A.

    2016-01-01

    The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such “indirect risks” can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i) the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii) risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their “at-risk status” designations. Risk assessments are not a replacement for impact assessments, but—by considering the potential for indirect risks as we demonstrate here—they offer a crucial complementary perspective for the management of ecosystems and the organisms within. PMID:27632287

  15. Risk assessment in international operations

    International Nuclear Information System (INIS)

    Stricklin, Daniela L.

    2008-01-01

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently

  16. Quantifying risk and assessing outcome in cardiac surgery.

    Science.gov (United States)

    Higgins, T L

    1998-06-01

    Quality improvement, research, and reporting of outcome results can be stratified by preoperative risk by using a logistic regression equation or scores to correct for multiple risk factors. The more than 30-fold mortality differences between lowest and highest risk patients make it critical to stratify outcome results by patient severity. Probabilities are not predictions, however, and caution must be exercised when applying scores to individuals. Outcome assessment will grow in its importance to professionals, initially in the guise of quality reporting and improvement, but increasingly as a tool for risk assessment, patient counseling, and directing therapeutic decisions based on more complete information about patient subgroups. Physicians may be called on for recommendations in choosing systems for their hospitals and communities. Therefore, it is important to have an understanding of how such systems are developed, what factors indicate adequate performance of a system, and how such systems of risk stratification should be applied in practice.

  17. Implications of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Cullingford, M.C.; Shah, S.M.; Gittus, J.H.

    1987-01-01

    Probabilistic risk assessment (PRA) is an analytical process that quantifies the likelihoods, consequences and associated uncertainties of the potential outcomes of postulated events. Starting with planned or normal operation, probabilistic risk assessment covers a wide range of potential accidents and considers the whole plant and the interactions of systems and human actions. Probabilistic risk assessment can be applied in safety decisions in design, licensing and operation of industrial facilities, particularly nuclear power plants. The proceedings include a review of PRA procedures, methods and technical issues in treating uncertainties, operating and licensing issues and future trends. Risk assessment for specific reactor types or components and specific risks (eg aircraft crashing onto a reactor) are used to illustrate the points raised. All 52 articles are indexed separately. (U.K.)

  18. Uncertainties in risk assessment at USDOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

  19. Uncertainties in risk assessment at USDOE facilities

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms open-quote risk assessment close-quote and open-quote risk management close-quote are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of open-quotes... the most significant data and uncertainties...close quotes in an assessment. Significant data and uncertainties are open-quotes...those that define and explain the main risk conclusionsclose quotes. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation

  20. Managing industrial risk--having a tested and proven system to prevent and assess risk.

    Science.gov (United States)

    Heller, Stephen

    2006-03-17

    Some relatively easy techniques exist to improve the risk picture/profile to aid in preventing losses. Today with the advent of computer system resources, focusing on specific aspects of risk through systematic scoring and comparison, the risk analysis can be relatively easy to achieve. Techniques like these demonstrate how working experience and common sense can be combined mathematically into a flexible risk management tool or risk model for analyzing risk. The risk assessment methodology provided by companies today is no longer the ideas and practices of one group or even one company. It is reflective of the practice of many companies, as well as the ideas and expertise of academia and government regulators. The use of multi-criteria decision making (MCDM) techniques for making critical decisions has been recognized for many years for a variety of purposes. In today's computer age, the easy accessing and user-friendly nature for using these techniques, makes them a favorable choice for use in the risk assessment environment. The new user of these methodologies should find many ideas directly applicable to his or her needs when approaching risk decision making. The user should find their ideas readily adapted, with slight modification, to accurately reflect a specific situation using MCDM techniques. This makes them an attractive feature for use in assessment and risk modeling. The main advantage of decision making techniques, such as MCDM, is that in the early stages of a risk assessment, accurate data on industrial risk, and failures are lacking. In most cases, it is still insufficient to perform a thorough risk assessment using purely statistical concepts. The practical advantages towards deviating from strict data-driven protocol seem to outweigh the drawbacks. Industry failure data often comes at a high cost when a loss occurs. We can benefit from this unfortunate acquisition of data through the continuous refining of our decisions by incorporating this new

  1. GAR Global Risk Assessment

    Science.gov (United States)

    Maskrey, Andrew; Safaie, Sahar

    2015-04-01

    Disaster risk management strategies, policies and actions need to be based on evidence of current disaster loss and risk patterns, past trends and future projections, and underlying risk factors. Faced with competing demands for resources, at any level it is only possible to priorities a range of disaster risk management strategies and investments with adequate understanding of realised losses, current and future risk levels and impacts on economic growth and social wellbeing as well as cost and impact of the strategy. The mapping and understanding of the global risk landscape has been greatly enhanced by the latest iteration of the GAR Global Risk Assessment and the objective of this submission is to present the GAR global risk assessment which contributed to Global Assessment Report (GAR) 2015. This initiative which has been led by UNISDR, was conducted by a consortium of technical institutions from around the world and has covered earthquake, cyclone, riverine flood, and tsunami probabilistic risk for all countries of the world. In addition, the risks associated with volcanic ash in the Asia-Pacific region, drought in various countries in sub-Saharan Africa and climate change in a number of countries have been calculated. The presentation will share thee results as well as the experience including the challenges faced in technical elements as well as the process and recommendations for the future of such endeavour.

  2. Audit Risk Assessment in the Light of Current European Regulations

    Directory of Open Access Journals (Sweden)

    Ciprian-Costel Munteanu

    2015-06-01

    Full Text Available Recent European reforms on audit regulations have been motivated by efforts to increase audit quality, functioning and performance. We believe the adoption of Directive 2014/56 and Regulation 537/2014 strengthened the role of independent audit and risk committees, which will positively contribute towards audit quality. This paper aims to critically assess the status quo of audit risk assessment in current European standards and regulations, by conducting a theoretical analysis of different aspects of audit risk. Our main objective is to stress the importance of detecting inherent and control risk, which lead to material misstatement at the assertion level. They need to be assessed so as to determine the nature, timing and extent of further audit procedures necessary to obtain sufficient appropriate audit evidence. These pieces of evidence enable the auditor to express an opinion on the financial statements at an acceptably low level of audit risk. Therefore, we point to the fact that researchers as well as practitioners and policymakers have to be careful when using audit tools and assessing risk levels, as their conclusions continuously shape the regulations.

  3. Performance assessment

    International Nuclear Information System (INIS)

    Doe, T.

    1985-01-01

    The purpose of performance assessment is to show that the repository is expected to serve its stated function - disposing of radioactive waste safely both during operation and for the postclosure period. Performance assessment is a straightforward concept, but its application may be very complicated. The concept of performance assessment has been clarified by the Nuclear Regulatory Commission (NRC) in their Draft Generic Technical Position on Licensing Assessment Methodology for High-Level Waste Geologic Repositories (NRC, 1984). This document has gone a long way toward defining the criteria that the NRC will use to determine whether or not information from site characterization is adequate to meet the regulations of the Nuclear Regulatory Commission and the Environmental Protection Agency (EPA). A favorable determination is required for issuance of a construction authorization, which is the first major regulatory requirement for developing a working repository. It is, therefore, essential that a research program be developed that not only resolves the outstanding technical issues, but also does it in such a way that the results are clearly applicable to the formal performance assessment and licensing procedures. The definitions of performance assessment are reviewed and the current NRC thinking is summarized

  4. Deterministic quantitative risk assessment development

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Jane; Colquhoun, Iain [PII Pipeline Solutions Business of GE Oil and Gas, Cramlington Northumberland (United Kingdom)

    2009-07-01

    Current risk assessment practice in pipeline integrity management is to use a semi-quantitative index-based or model based methodology. This approach has been found to be very flexible and provide useful results for identifying high risk areas and for prioritizing physical integrity assessments. However, as pipeline operators progressively adopt an operating strategy of continual risk reduction with a view to minimizing total expenditures within safety, environmental, and reliability constraints, the need for quantitative assessments of risk levels is becoming evident. Whereas reliability based quantitative risk assessments can be and are routinely carried out on a site-specific basis, they require significant amounts of quantitative data for the results to be meaningful. This need for detailed and reliable data tends to make these methods unwieldy for system-wide risk k assessment applications. This paper describes methods for estimating risk quantitatively through the calibration of semi-quantitative estimates to failure rates for peer pipeline systems. The methods involve the analysis of the failure rate distribution, and techniques for mapping the rate to the distribution of likelihoods available from currently available semi-quantitative programs. By applying point value probabilities to the failure rates, deterministic quantitative risk assessment (QRA) provides greater rigor and objectivity than can usually be achieved through the implementation of semi-quantitative risk assessment results. The method permits a fully quantitative approach or a mixture of QRA and semi-QRA to suit the operator's data availability and quality, and analysis needs. For example, consequence analysis can be quantitative or can address qualitative ranges for consequence categories. Likewise, failure likelihoods can be output as classical probabilities or as expected failure frequencies as required. (author)

  5. Risk assessment of integrated electronic health records.

    Science.gov (United States)

    Bjornsson, Bjarni Thor; Sigurdardottir, Gudlaug; Stefansson, Stefan Orri

    2010-01-01

    The paper describes the security concerns related to Electronic Health Records (EHR) both in registration of data and integration of systems. A description of the current state of EHR systems in Iceland is provided, along with the Ministry of Health's future vision and plans. New legislation provides the opportunity for increased integration of EHRs and further collaboration between institutions. Integration of systems, along with greater availability and access to EHR data, requires increased security awareness since additional risks are introduced. The paper describes the core principles of information security as it applies to EHR systems and data. The concepts of confidentiality, integrity, availability, accountability and traceability are introduced and described. The paper discusses the legal requirements and importance of performing risk assessment for EHR data. Risk assessment methodology according to the ISO/IEC 27001 information security standard is described with examples on how it is applied to EHR systems.

  6. Evaluation of thermal risk assessment

    International Nuclear Information System (INIS)

    Loos, J.J.; Perry, E.S.

    1993-01-01

    Risk assessment was done in 1983 to estimate the ecological hazard of increasing the generating load and thermal output of an electric generating station. Subsequently, long-term monitoring in the vicinity of the station allowed verification of the predictions made in the risk assessment. This presentation will review the efficacy of early risk assessment methods in producing useful predictions from a resource management point of view. In 1984, the Chalk Point Generating facility of the Potomac Electric Power Company increased it's median generating load by 100%. Prior to this operational change, the Academy of Natural Sciences of Philadelphia synthesized site specific data, model predictions, and results from literature to assess the risk of additional waste heat to the Patuxent River subestuary of Chesapeake Bay. Risk was expressed as the number of days per year that various species of fish and the blue crab would be expected to avoid the discharge vicinity. Accuracy of these predictions is assessed by comparing observed fish and crab distributions and their observed frequencies of avoidance to those predicted. It is concluded that the predictions of this early risk assessment were sufficiently accurate to produce a reliable resource management decision

  7. Measurement properties of performance-based outcome measures to assess physical function in young and middle-aged people known to be at high risk of hip and/or knee osteoarthritis

    DEFF Research Database (Denmark)

    Kroman, S L; Roos, Ewa M.; Bennell, K L

    2014-01-01

    To systematically appraise the evidence on measurement properties of performance-based outcome measures to assess physical function in young and middle-aged people known to be at high risk of hip and/or knee osteoarthritis (OA).......To systematically appraise the evidence on measurement properties of performance-based outcome measures to assess physical function in young and middle-aged people known to be at high risk of hip and/or knee osteoarthritis (OA)....

  8. On risk assessment of energy production

    International Nuclear Information System (INIS)

    Kunii, Katsuhiko

    2005-07-01

    Today we cannot ignore the risk of health and/or environment by energy production such as power generation since the risk has been made large enough. In this report an information survey has been done in order to know the outline and points of risk assessment. Based on the information of reports and literature about risk assessment, have been surveyed mainly the external cost assessment of power generation (in which quantification of health and/or environment risk has been done), in addition, risks of disasters, accidents, investments, finance etc. and impacts of those risks on social activities. The remarks obtained by the survey are as follows: 1) Some of external cost assessment of power generation show different results even if the assessment conditions of technology, site, etc. are mostly the same. It is necessary to remark on the information such as basic data, model, background, application limit of assessment considering the reliability. 2) Especially it is considered that the reliability of risk assessment is not enough at present because of the lack of basic data. (author)

  9. Building Confidence in LLW Performance Assessments - 13386

    Energy Technology Data Exchange (ETDEWEB)

    Rustick, Joseph H.; Kosson, David S.; Krahn, Steven L.; Clarke, James H. [Vanderbilt University, Department of Civil and Environmental Engineering and Consortium for Risk Evaluation with Stakeholder Participation, Nashville, Tennessee, 37235 (United States)

    2013-07-01

    The performance assessment process and incorporated input assumptions for four active and one planned DOE disposal sites were analyzed using a systems approach. The sites selected were the Savannah River E-Area Slit and Engineered Trenches, Hanford Integrated Disposal Facility, Idaho Radioactive Waste Management Complex, Oak Ridge Environmental Management Waste Management Facility, and Nevada National Security Site Area 5. Each disposal facility evaluation incorporated three overall system components (1) site characteristics (climate, geology, geochemistry, etc.), (2) waste properties (waste form and package), and (3) engineered barrier designs (cover system, liner system). Site conceptual models were also analyzed to identity the main risk drivers and risk insights controlling performance for each disposal facility. (authors)

  10. Building Confidence in LLW Performance Assessments - 13386

    International Nuclear Information System (INIS)

    Rustick, Joseph H.; Kosson, David S.; Krahn, Steven L.; Clarke, James H.

    2013-01-01

    The performance assessment process and incorporated input assumptions for four active and one planned DOE disposal sites were analyzed using a systems approach. The sites selected were the Savannah River E-Area Slit and Engineered Trenches, Hanford Integrated Disposal Facility, Idaho Radioactive Waste Management Complex, Oak Ridge Environmental Management Waste Management Facility, and Nevada National Security Site Area 5. Each disposal facility evaluation incorporated three overall system components (1) site characteristics (climate, geology, geochemistry, etc.), (2) waste properties (waste form and package), and (3) engineered barrier designs (cover system, liner system). Site conceptual models were also analyzed to identity the main risk drivers and risk insights controlling performance for each disposal facility. (authors)

  11. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    Clauss, D.B.

    1994-01-01

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  12. Risk Factor Assessment Branch (RFAB)

    Science.gov (United States)

    The Risk Factor Assessment Branch (RFAB) focuses on the development, evaluation, and dissemination of high-quality risk factor metrics, methods, tools, technologies, and resources for use across the cancer research continuum, and the assessment of cancer-related risk factors in the population.

  13. Risk assessments ensure safer power

    Energy Technology Data Exchange (ETDEWEB)

    1982-02-19

    A growth industry is emerging devoted to the study and comparison of the economic, social and health risks posed by large industrial installations. Electricity generation is one area coming under particularly close scrutiny. Types of risk, ways of assessing risk and the difference between experts' analyses and the public perception of risk are given. An example of improved risk assessment helping to reduce deaths and injuries in coal mining is included.

  14. Risk assessment of mitigated domino scenarios in process facilities

    International Nuclear Information System (INIS)

    Landucci, Gabriele; Necci, Amos; Antonioni, Giacomo; Argenti, Francesca; Cozzani, Valerio

    2017-01-01

    The propagation of accidents among process units may lead to severe cascading events or domino effects with catastrophic consequences. Prevention, mitigation and management of domino scenarios is of utmost importance and may be achieved in industrial facilities through the adoption of multiple safety layers. The present study was aimed at developing an innovative methodology to address the quantitative risk assessment (QRA) of domino scenarios accounting for the presence and role of safety barriers. Based on the expected performance of safety barriers, a dedicated event tree analysis allowed the identification and the assessment of the frequencies of the different end-point events deriving from unmitigated and partially mitigated domino chains. Specific criteria were introduced in consequence analysis to consider the mitigation effects of end-point scenarios deriving from safety barriers. Individual and societal risk indexes were calculated accounting for safety barriers and the mitigated scenarios that may result from their actions. The application of the methodology to case-studies of industrial interest proved the importance of introducing a specific systematic and quantitative analysis of safety barrier performance when addressing escalation leading to domino effect. - Highlights: • A methodology was developed to account for safety barrier performance in escalation prevention. • The methodology allows quantitative assessment accounting for safety barrier performance. • A detailed analysis of transient mitigated scenarios is allowed by the developed procedure. • The procedure allows accounting for safety barrier performance in QRA of domino scenarios. • An important reduction in the risk due to domino scenarios is evidenced when considering safety barriers.

  15. Risk and Performance Technologies: Identifying the Keys to Successful Implementation

    International Nuclear Information System (INIS)

    McClain, Lynn; Smith, Art; O'Regan, Patrick

    2002-01-01

    The nuclear power industry has been utilizing risk and performance based technologies for over thirty years. Applications of these technologies have included risk assessment (e.g. Individual Plant Examinations), burden reduction (e.g. Risk-Informed Inservice Inspection, RI-ISI) and risk management (Maintenance Rule, 10CFR50.65). Over the last five to ten years the number of risk-informed (RI) burden reduction initiatives has increased. Unfortunately, the efficiencies of some of these applications have been questionable. This paper investigates those attributes necessary to support successful, cost-effective RI-applications. The premise to this paper is that by understanding the key attributes that support one successful application, insights can be gleaned that will streamline/coordinate future RI-applications. This paper is an extension to a paper presented at the Pressure Vessel and Piping (PVP-2001) Conference. In that paper, a number issues and opportunities were identified that needed to be assessed in order to support future (and efficient) RI-applications. It was noted in the paper that a proper understanding and resolution of these issues will facilitate implementation of risk and performance technology in the operation, maintenance and design disciplines. In addition, it will provide the foundation necessary to support regulatory review and approval. (authors)

  16. Regulatory compliance for a Yucca Mountain Repository: A performance assessment perspective

    International Nuclear Information System (INIS)

    Dyer, J.R.; Van Luik, A.E.; Gil, A.V.; Brocoum, S.J.

    1997-01-01

    The U.S. Department of Energy's Yucca Mountain Site Characterization Project is scheduled to submit a License Application in the year 2002. The License Application is to show compliance with the regulations promulgated by the U.S. Nuclear Regulatory Commission which implement standards promulgated by the U.S. Environmental Protection Agency. These standards are being revised, and it is not certain what their exact nature will be in term of either the performance measure(s) or the time frames that are to be addressed. This paper provides some insights pertaining to this regulatory history, an update on Yucca Mountain performance assessments, and a Yucca Mountain Site Characterization Project perspective on proper standards based on Project experience in performance assessment for its proposed Yucca Mountain Repository system. The Project's performance assessment based perspective on a proper standard applicable to Yucca Mountain may be summarized as follows: a proper standard should be straight forward and understandable; should be consistent with other standards and regulations; and should require a degree of proof that is scientifically supportable in a licensing setting. A proper standard should have several attributes: (1) propose a reasonable risk level as its basis, whatever the quantitative performance measure is chosen to be, (2) state a definite regulatory time frame for showing compliance with quantitative requirements, (3) explicitly recognize that the compliance calculations are not predictions of actual future risks, (4) define the biosphere to which risk needs to be calculated in such a way as to constrain potentially endless speculation about future societies and future human actions, and (5) have as its only quantitative requirement the risk limit (or surrogate performance measure keyed to risk) for the total system

  17. Modeling risk assessment for nuclear processing plants with LAVA

    International Nuclear Information System (INIS)

    Smith, S.T.; Tisinger, R.M.

    1988-01-01

    Using the Los Alamos Vulnerability and Risk Assessment (LAVA) methodology, the authors developed a model for assessing risks associated with nuclear processing plants. LAVA is a three-part systematic approach to risk assessment. The first part is the mathematical methodology; the second is the general personal computer-based software engine; and the third is the application itself. The methodology provides a framework for creating applications for the software engine to operate upon; all application-specific information is data. Using LAVA, the authors build knowledge-based expert systems to assess risks in applications systems comprising a subject system and a safeguards system. The subject system model is sets of threats, assets, and undesirable outcomes. The safeguards system model is sets of safeguards functions for protecting the assets from the threats by preventing or ameliorating the undesirable outcomes, sets of safeguards subfunctions whose performance determine whether the function is adequate and complete, and sets of issues, appearing as interactive questionnaires, whose measures (in both monetary and linguistic terms) define both the weaknesses in the safeguards system and the potential costs of an undesirable outcome occurring

  18. Economic aspects of risk assessment in chemical safety

    Energy Technology Data Exchange (ETDEWEB)

    Drummond, M F; Shannon, H S

    1986-05-01

    This paper considers how the economic aspects of risk assessment in chemical safety can be strengthened. Its main focus is on how economic appraisal techniques, such as cost-benefit and cost-effectiveness analysis, can be adapted to the requirements of the risk-assessment process. Following a discussion of the main methodological issues raised by the use of economic appraisal, illustrated by examples from the health and safety field, a number of practical issues are discussed. These include the consideration of the distribution of costs, effects and benefits, taking account of uncertainty, risk probabilities and public perception, making the appraisal techniques useful to the early stages of the risk-assessment process and structuring the appraisal to permit continuous feedback to the participants in the risk-assessment process. It is concluded that while the way of thinking embodied in economic appraisal is highly relevant to the consideration of choices in chemical safety, the application of these principles in formal analysis of risk reduction procedures presents a more mixed picture. The main suggestions for improvement in the analyses performed are the undertaking of sensitivity analyses of study results to changes in the key assumptions, the presentation of the distribution of costs and benefits by viewpoint, the comparison of health and safety measures in terms of their incremental cost per life-year (or quality-adjusted life-year) gained and the more frequent retrospective review and revision of the economic analyses that are undertaken.

  19. Audit Risk Assessment in the Light of Current European Regulations

    OpenAIRE

    Ciprian-Costel Munteanu

    2015-01-01

    Recent European reforms on audit regulations have been motivated by efforts to increase audit quality, functioning and performance. We believe the adoption of Directive 2014/56 and Regulation 537/2014 strengthened the role of independent audit and risk committees, which will positively contribute towards audit quality. This paper aims to critically assess the status quo of audit risk assessment in current European standards and regulations, by conducting a theoretical analysis of different as...

  20. Risk assessment

    DEFF Research Database (Denmark)

    Pedersen, Liselotte; Rasmussen, Kirsten; Elsass, Peter

    2010-01-01

    International research suggests that using formalized risk assessment methods may improve the predictive validity of professionals' predictions of risk of future violence. This study presents data on forensic psychiatric patients discharged from a forensic unit in Denmark in year 2001-2002 (n=107...... and the individual dynamic items strengthen the use of this scheme in clinical practice. (PsycINFO Database Record (c) 2010 APA, all rights reserved) (journal abstract)...

  1. The role of risk assessment and safety analysis in integrated safety assessments

    International Nuclear Information System (INIS)

    Niall, R.; Hunt, M.; Wierman, T.E.

    1990-01-01

    To ensure that the design and operation of both nuclear and non- nuclear hazardous facilities is acceptable, and meets all societal safety expectations, a rigorous deterministic and probabilistic assessment is necessary. An approach is introduced, founded on the concept of an ''Integrated Safety Assessment.'' It merges the commonly performed safety and risk analyses and uses them in concert to provide decision makers with the necessary depth of understanding to achieve ''adequacy.'' 3 refs., 1 fig

  2. Meeting the challenges in the development of risk-benefit assessment of foods

    DEFF Research Database (Denmark)

    Nauta, Maarten; Andersen, Rikke; Pilegaard, Kirsten

    2018-01-01

    challenges are identified and discussed. They include the variety of different definitions and terminologies used in the underlying research disciplines, the differences between the “bottom-up” and the “top-down” approaches and the need for clear risk-benefit questions. The frequent lack of data......Background Risk-benefit assessment (RBA) of foods aims to assess the combined negative and positive health effects associated with food intake. RBAs integrate chemical and microbiological risk assessment with risk and benefit assessment in nutrition. Scope and Approach Based on the past experiences...... interdisciplinary consensus, reconsideration of methodological approaches and health metrics based on a categorisation of risk-benefit questions, and the performance of case studies to experience the feasibility of the proposed approaches....

  3. Sudden Cardiac Arrest (SCA) Risk Assessment

    Science.gov (United States)

    ... HRS Find a Specialist Share Twitter Facebook SCA Risk Assessment Sudden Cardiac Arrest (SCA) occurs abruptly and without ... people of all ages and health conditions. Start Risk Assessment The Sudden Cardiac Arrest (SCA) Risk Assessment Tool ...

  4. Integrated climate change risk assessment:

    DEFF Research Database (Denmark)

    Kaspersen, Per Skougaard; Halsnæs, Kirsten

    2017-01-01

    Risk assessments of flooding in urban areas during extreme precipitation for use in, for example, decision-making regarding climate adaptation, are surrounded by great uncertainties stemming from climate model projections, methods of downscaling and the assumptions of socioeconomic impact models...... to address the complex linkages between the different kinds of data required in assessing climate adaptation. It emphasizes that the availability of spatially explicit data can reduce the overall uncertainty of the risk assessment and assist in identifying key vulnerable assets. The usefulness...... of such a framework is demonstrated by means of a risk assessment of flooding from extreme precipitation for the city of Odense, Denmark. A sensitivity analysis shows how the presence of particularly important assets, such as cultural and historical heritage, may be addressed in assessing such risks. The output...

  5. Track 6: safety and risk management. Plant operational risk management. Plant Configuration Risk Assessment Methodology Development for Periodic Maintenance

    International Nuclear Information System (INIS)

    Yang, Huichang; Chung, Chang Hyun; Sung, Key Yong

    2001-01-01

    As the operation experiences of nuclear power plants (NPPs) in Korea accumulate and NPP safety functions become enhanced, the role of stable and optimal NPP operation within acceptable safety criteria becomes important at present. To accomplish the goal of safe and optimal operation, maintenance and its related activities should be regarded as the issues of most concern. Studies of methodologies for maintenance improvement and optimization have focused on system performance rather than on the hardware itself. From this point of view, the probabilistic methods are most useful. In terms of risk including core damage frequency and unavailability, the cause that might impact plant safety during normal maintenance activities can be identified and evaluated effectively. The results from these probabilistic analyses can provide insightful information for the reallocation of risk-contributing maintenance activity. This information can be utilized in a way that separates the significant risk-contributing maintenance activities from each other unless they are timely related. In Korea, the risk-monitoring program for operating NPPs is under development and will be implemented in 2003. To accomplish the risk-monitoring program objectives, suitable risk evaluation methods should be developed before the implementation of the risk-monitoring program. The plant configuration assessment methodology was developed for these reasons, and this method is to incorporate the field experiences into the risk calculation exactly within the limit of probabilistic methods. During normal plant operation, the plant operational risk changes frequently depending on the status of the plant system and the arrangement of the components. Specific plant systems or components are typically removed from service because of random equipment failure, planned preventive/predictive maintenance, corrective maintenance, surveillance testing, and operational bypass activities, and such events usually impact the

  6. Assessment of three risk evaluation systems for patients aged ≥70 in East China: performance of SinoSCORE, EuroSCORE II and the STS risk evaluation system.

    Science.gov (United States)

    Shan, Lingtong; Ge, Wen; Pu, Yiwei; Cheng, Hong; Cang, Zhengqiang; Zhang, Xing; Li, Qifan; Xu, Anyang; Wang, Qi; Gu, Chang; Zhang, Yangyang

    2018-01-01

    To assess and compare the predictive ability of three risk evaluation systems (SinoSCORE, EuroSCORE II and the STS risk evaluation system) in patients aged ≥70, and who underwent coronary artery bypass grafting (CABG) in East China. Three risk evaluation systems were applied to 1,946 consecutive patients who underwent isolated CABG from January 2004 to September 2016 in two hospitals. Patients were divided into two subsets according to their age: elderly group (age ≥70) with a younger group (age evaluation system were 0.78(0.64)%, 1.43(1.14)% and 0.78(0.77)%, respectively. SinoSCORE achieved the best discrimination (the area under the receiver operating characteristic curve (AUC) = 0.829), followed by the STS risk evaluation system (AUC = 0.790) and EuroSCORE II (AUC = 0.769) in the entire cohort. In the elderly group, the observed mortality rate was 4.82% while it was 1.38% in the younger group. SinoSCORE (AUC = .829) also achieved the best discrimination in the elderly group, followed by the STS risk evaluation system (AUC = .730) and EuroSCORE II (AUC = 0.640) while all three risk evaluation systems all had good performances in the younger group. SinoSCORE, EuroSCORE II and the STS risk evaluation system all achieved positive calibrations in the entire cohort and subsets. The performance of the three risk evaluation systems was not ideal in the entire cohort. In the elderly group, SinoSCORE appeared to achieve better predictive efficiency than EuroSCORE II and the STS risk evaluation system.

  7. Earthquake risk assessment of building structures

    International Nuclear Information System (INIS)

    Ellingwood, Bruce R.

    2001-01-01

    During the past two decades, probabilistic risk analysis tools have been applied to assess the performance of new and existing building structural systems. Structural design and evaluation of buildings and other facilities with regard to their ability to withstand the effects of earthquakes requires special considerations that are not normally a part of such evaluations for other occupancy, service and environmental loads. This paper reviews some of these special considerations, specifically as they pertain to probability-based codified design and reliability-based condition assessment of existing buildings. Difficulties experienced in implementing probability-based limit states design criteria for earthquake are summarized. Comparisons of predicted and observed building damage highlight the limitations of using current deterministic approaches for post-earthquake building condition assessment. The importance of inherent randomness and modeling uncertainty in forecasting building performance is examined through a building fragility assessment of a steel frame with welded connections that was damaged during the Northridge Earthquake of 1994. The prospects for future improvements in earthquake-resistant design procedures based on a more rational probability-based treatment of uncertainty are examined

  8. Spent Nuclear Fuel Transportation Risk Assessment Methodology for Homeland Security

    International Nuclear Information System (INIS)

    Teagarden, Grant A.; Canavan, Kenneth T.; Nickell, Robert E.

    2006-01-01

    In response to increased interest in risk-informed decision making regarding terrorism, EPRI was selected by U.S. DHS and ASME to develop and demonstrate a nuclear sector specific methodology for owner / operators to utilize in performing a Risk Analysis and Management for Critical Asset Protection (RAMCAP) assessment for the transportation of spent nuclear fuel (SNF). The objective is to characterize SNF transportation risk for risk management opportunities and to provide consistent information for DHS decision making. The method uses a characterization of risk as a function of Consequence, Vulnerability, and Threat. Worst reasonable case scenarios characterize risk for a benchmark set of threats and consequence types. A trial application was successfully performed and implementation is underway by one utility. (authors)

  9. Establishing a family risk assessment clinic for breast cancer.

    LENUS (Irish Health Repository)

    Mulsow, Jurgen

    2012-02-01

    Breast cancer is the most common cancer affecting European women and the leading cause of cancer-related death. A total of 15-20% of women who develop breast cancer have a family history and 5-10% a true genetic predisposition. The identification and screening of women at increased risk may allow early detection of breast cancer and improve prognosis. We established a family risk assessment clinic in May 2005 to assess and counsel women with a family history of breast cancer, to initiate surveillance, and to offer risk-reducing strategies for selected high-risk patients. Patients at medium or high risk of developing breast cancer according to NICE guidelines were accepted. Family history was determined by structured questionnaire and interview. Lifetime risk of developing breast cancer was calculated using Claus and Tyrer-Cuzick scoring. Risk of carrying a breast cancer-related gene mutation was calculated using the Manchester system. One thousand two hundred and forty-three patients have been referred. Ninety-two percent were at medium or high risk of developing breast cancer. Formal assessment of risk has been performed in 368 patients, 73% have a high lifetime risk of developing breast cancer, and 72% a Manchester score >or=16. BRCA1\\/2 mutations have been identified in 14 patients and breast cancer diagnosed in two. Our initial experience of family risk assessment has shown there to be a significant demand for this service. Identification of patients at increased risk of developing breast cancer allows us to provide individuals with accurate risk profiles, and enables patients to make informed choices regarding their follow-up and management.

  10. Preliminary risk assessments of the small HTGR

    International Nuclear Information System (INIS)

    Everline, C.J.; Bellis, E.A.

    1985-05-01

    Preliminary investment and safety risk assessments were performed for a preconceptual design of a four-module 250-MW(t) side-by-side steel-vessel pebble bed HTGR plant. Broad event spectra were analyzed involving component damage resulting in unscheduled plant outages and fission product releases resulting in offsite doses. The preliminary assessment indicates at this stage of the design that two categories of events govern the investment risk envelope: primary coolant leaks which release some circulating and plate-out activity that contaminates the confinement and turbogenerator damage which involves extensive turbine blade failure. Primary coolant leaks are important contributors because associated cleanup and decontamination requirements result in longer outages that arise from other events with comparable frequencies. Turbogenerator damage is the salient low-frequency investment risk accident due to the relatively long outages being experienced in the industry. Thermal transients are unimportant investment risk contributors because pressurized core heatups cause little damage, and depressurized core heatups occur at negligible frequencies relative to the forced outage goal. These preliminary results demonstrate investment and safety risk goal compliance at this stage in the design process. Studies are continuing in order to provide valuable insights into risk-significant events to assure a balanced approach to meeting user and regulatory requirements

  11. Fall Risk Assessment Through Automatic Combination of Clinical Fall Risk Factors and Body-Worn Sensor Data.

    Science.gov (United States)

    Greene, Barry R; Redmond, Stephen J; Caulfield, Brian

    2017-05-01

    Falls are the leading global cause of accidental death and disability in older adults and are the most common cause of injury and hospitalization. Accurate, early identification of patients at risk of falling, could lead to timely intervention and a reduction in the incidence of fall-related injury and associated costs. We report a statistical method for fall risk assessment using standard clinical fall risk factors (N = 748). We also report a means of improving this method by automatically combining it, with a fall risk assessment algorithm based on inertial sensor data and the timed-up-and-go test. Furthermore, we provide validation data on the sensor-based fall risk assessment method using a statistically independent dataset. Results obtained using cross-validation on a sample of 292 community dwelling older adults suggest that a combined clinical and sensor-based approach yields a classification accuracy of 76.0%, compared to either 73.6% for sensor-based assessment alone, or 68.8% for clinical risk factors alone. Increasing the cohort size by adding an additional 130 subjects from a separate recruitment wave (N = 422), and applying the same model building and validation method, resulted in a decrease in classification performance (68.5% for combined classifier, 66.8% for sensor data alone, and 58.5% for clinical data alone). This suggests that heterogeneity between cohorts may be a major challenge when attempting to develop fall risk assessment algorithms which generalize well. Independent validation of the sensor-based fall risk assessment algorithm on an independent cohort of 22 community dwelling older adults yielded a classification accuracy of 72.7%. Results suggest that the present method compares well to previously reported sensor-based fall risk assessment methods in assessing falls risk. Implementation of objective fall risk assessment methods on a large scale has the potential to improve quality of care and lead to a reduction in associated hospital

  12. Risk Informed Design Using Integrated Vehicle Rapid Assessment Tools

    Data.gov (United States)

    National Aeronautics and Space Administration — A successful proof of concept was performed in FY 2012 integrating the Envision tool for parametric estimates of vehicle mass and the Rapid Response Risk Assessment...

  13. Caries risk assessment

    DEFF Research Database (Denmark)

    Mejàre, I; Axelsson, S; Dahlén, G

    2014-01-01

    OBJECTIVE: To assess the ability of multivariate models and single factors to correctly identify future caries development in pre-school children and schoolchildren/adolescents. STUDY DESIGN: A systematic literature search for relevant papers was conducted with pre-determined inclusion criteria...... predictors, baseline caries experience had moderate/good accuracy in pre-school children and limited accuracy in schoolchildren/adolescents. The period of highest risk for caries incidence in permanent teeth was the first few years after tooth eruption. In general, the quality of evidence was limited....... CONCLUSIONS: Multivariate models and baseline caries prevalence performed better in pre-school children than in schoolchildren/adolescents. Baseline caries prevalence was the most accurate single predictor in all age groups. The heterogeneity of populations, models, outcome criteria, measures and reporting...

  14. Benchmarking Global Food Safety Performances: The Era of Risk Intelligence.

    Science.gov (United States)

    Valleé, Jean-Charles Le; Charlebois, Sylvain

    2015-10-01

    Food safety data segmentation and limitations hamper the world's ability to select, build up, monitor, and evaluate food safety performance. Currently, there is no metric that captures the entire food safety system, and performance data are not collected strategically on a global scale. Therefore, food safety benchmarking is essential not only to help monitor ongoing performance but also to inform continued food safety system design, adoption, and implementation toward more efficient and effective food safety preparedness, responsiveness, and accountability. This comparative study identifies and evaluates common elements among global food safety systems. It provides an overall world ranking of food safety performance for 17 Organisation for Economic Co-Operation and Development (OECD) countries, illustrated by 10 indicators organized across three food safety risk governance domains: risk assessment (chemical risks, microbial risks, and national reporting on food consumption), risk management (national food safety capacities, food recalls, food traceability, and radionuclides standards), and risk communication (allergenic risks, labeling, and public trust). Results show all countries have very high food safety standards, but Canada and Ireland, followed by France, earned excellent grades relative to their peers. However, any subsequent global ranking study should consider the development of survey instruments to gather adequate and comparable national evidence on food safety.

  15. Assessing the risk of recurrent venous thromboembolism--a practical approach.

    Science.gov (United States)

    Fahrni, Jennifer; Husmann, Marc; Gretener, Silvia B; Keo, Hong H

    2015-01-01

    Recurrent venous thromboembolism (VTE) is associated with increased morbidity and mortality. This risk is lowered by anticoagulation, with a large effect in the initial phase following the venous thromboembolic event, and with a smaller effect in terms of secondary prevention of recurrence when extended anticoagulation is performed. On the other hand, extended anticoagulation is associated with an increased risk of major bleeding and thus leads to morbidity and mortality. Therefore, it is necessary to assess the risk of recurrence for VTE on an individual basis, and a recommendation for secondary prophylaxis should be specifically based on risk calculation of recurrence of VTE and bleeding. In this review, we provide a comprehensive summary of relevant risk factors for recurrent VTE and a practical approach for assessing the risk of recurrence in daily practice.

  16. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  17. Assessing Your Weight and Health Risk

    Science.gov (United States)

    ... Health Professional Resources Assessing Your Weight and Health Risk Assessment of weight and health risk involves using ... risk for developing obesity-associated diseases or conditions. Risk Factors for Health Topics Associated With Obesity Along ...

  18. Humans vs Hardware: The Unique World of NASA Human System Risk Assessment

    Science.gov (United States)

    Anton, W.; Havenhill, M.; Overton, Eric

    2016-01-01

    Understanding spaceflight risks to crew health and performance is a crucial aspect of preparing for exploration missions in the future. The research activities of the Human Research Program (HRP) provide substantial evidence to support most risk reduction work. The Human System Risk Board (HSRB), acting on behalf of the Office of Chief Health and Medical Officer (OCHMO), assesses these risks and assigns likelihood and consequence ratings to track progress. Unfortunately, many traditional approaches in risk assessment such as those used in the engineering aspects of spaceflight are difficult to apply to human system risks. This presentation discusses the unique aspects of risk assessment from the human system risk perspective and how these limitations are accommodated and addressed in order to ensure that reasonable inputs are provided to support the OCHMO's overall risk posture for manned exploration missions.

  19. A multimodal assessment of driving performance in HIV infection.

    Science.gov (United States)

    Marcotte, T D; Wolfson, T; Rosenthal, T J; Heaton, R K; Gonzalez, R; Ellis, R J; Grant, I

    2004-10-26

    To examine if HIV-seropositive (HIV+) individuals are at risk for impaired driving. Sixty licensed drivers (40 HIV+, 20 HIV-) completed a neuropsychological (NP) test battery and driving assessments. Eleven HIV+ subjects were NP-impaired. Driving-related skills were assessed using 1) two driving simulations (examining accident avoidance and navigational abilities), 2) the Useful Field of View (UFOV) test, and 3) an on-road evaluation. HIV+ NP-impaired subjects had greater difficulty than cognitively intact subjects on all driving measures, whereas the HIV- and HIV+ NP-normal groups performed similarly. On the UFOV, the HIV+ NP-impaired group had worse performance on Visual Processing and Divided Attention tasks but not in overall risk classification. They also had a higher number of simulator accidents (1.3 vs 2.0; p = 0.03), were less efficient at completing the navigation task (3.2 vs 9.2 blocks; p = 0.001), and were more likely to fail the on-road evaluation (6 vs 36%; p = 0.02). Impairment in Executive Functioning was the strongest NP predictor of failing the on-road drive test. NP performance and both simulations independently contributed to a model predicting 48% of the variance in on-road performance. HIV+ NP-impaired individuals are at increased risk for on-road driving impairments, whereas HIV+ individuals with normal cognition are not at a significantly higher risk than HIV- subjects. Executive Functioning is most strongly associated with impaired on-road performance. Cognitive and simulator testing may each provide data in identifying driving-impaired individuals.

  20. Psychosocial risks and job performance

    NARCIS (Netherlands)

    Klein Hesselink, J.; Oeij, P.; Kraan, K.O.

    2014-01-01

    In this article, we concentrate on explaining job performance from the perspective of psychosocial risks in the work environment. Many risks may hinder good job performance. The article does not concentrate on physical (such as, carrying heavy loads) or environmental risks (such as, extreme heat or

  1. Risk assessment theory, methods, and applications

    CERN Document Server

    Rausand, Marvin

    2011-01-01

    With its balanced coverage of theory and applications along with standards and regulations, Risk Assessment: Theory, Methods, and Applications serves as a comprehensive introduction to the topic. The book serves as a practical guide to current risk analysis and risk assessment, emphasizing the possibility of sudden, major accidents across various areas of practice from machinery and manufacturing processes to nuclear power plants and transportation systems. The author applies a uniform framework to the discussion of each method, setting forth clear objectives and descriptions, while also shedding light on applications, essential resources, and advantages and disadvantages. Following an introduction that provides an overview of risk assessment, the book is organized into two sections that outline key theory, methods, and applications. * Introduction to Risk Assessment defines key concepts and details the steps of a thorough risk assessment along with the necessary quantitative risk measures. Chapters outline...

  2. ANALYSING PERFORMANCE ASSESSMENT IN PUBLIC SERVICES: HOW USEFUL IS THE CONCEPT OF A PERFORMANCE REGIME?

    Science.gov (United States)

    Martin, Steve; Nutley, Sandra; Downe, James; Grace, Clive

    2016-03-01

    Approaches to performance assessment have been described as 'performance regimes', but there has been little analysis of what is meant by this concept and whether it has any real value. We draw on four perspectives on regimes - 'institutions and instruments', 'risk regulation regimes', 'internal logics and effects' and 'analytics of government' - to explore how the concept of a multi-dimensional regime can be applied to performance assessment in public services. We conclude that the concept is valuable. It helps to frame comparative and longitudinal analyses of approaches to performance assessment and draws attention to the ways in which public service performance regimes operate at different levels, how they change over time and what drives their development. Areas for future research include analysis of the impacts of performance regimes and interactions between their visible features (such as inspections, performance indicators and star ratings) and the veiled rationalities which underpin them.

  3. Offshore Platform Hydrocarbon Risk Assessment – OPHRA: Feasibility

    DEFF Research Database (Denmark)

    Duijm, Nijs Jan; Kozine, Igor; Markert, Frank

    This report describes the feasibility demonstration of a new method to perform risk assessments for offshore platforms. This method simulates the following phenomena as concurrent sequences of events using the Arena® Discrete Event Simulation (DES) software (version 14.50.00): • Release, ignition...

  4. Risk Assessment in the Maritime Industry

    Directory of Open Access Journals (Sweden)

    M. Mousavi

    2017-02-01

    Full Text Available Risk assessment is a well-developed field which many operators are currently applying to improve their operations and reduce their risk exposure. This paper is intended to provide an overview of the risk assessment for mariners in the Maritime transportation. The risks addressed are primarily those affecting the safety of a vessel, facility or operation. The concept of risk is defined, and the methods available to assess the risks associated with an operation are described. Regulatory requirements that have prompted the development of modern risk assessment practices are described, and future regulatory trends are discussed. There are many different analysis techniques and models that have been developed to aid in conducting risk assessments. A key to any successful risk analysis is choosing the right method (or combination of methods for the situation at hand. This is achieved through critical analysis of the available data concerning marine crises. This paper provides a brief introduction to some of the analysis methods available and suggests risk analysis approaches to support different types of decision making within the maritime transportation to cope with crises. Finally, as awareness of risk assessment increases, the benefits which can be realized through its application will continue to increase. Organizations in both the public and the private sector are becoming more and more familiar with the benefits associated with risk-based approaches to managing safety and consequently reducing crisis in maritime transportation.

  5. Ensuring the quality of occupational safety risk assessment.

    Science.gov (United States)

    Pinto, Abel; Ribeiro, Rita A; Nunes, Isabel L

    2013-03-01

    In work environments, the main aim of occupational safety risk assessment (OSRA) is to improve the safety level of an installation or site by either preventing accidents and injuries or minimizing their consequences. To this end, it is of paramount importance to identify all sources of hazards and assess their potential to cause problems in the respective context. If the OSRA process is inadequate and/or not applied effectively, it results in an ineffective safety prevention program and inefficient use of resources. An appropriate OSRA is an essential component of the occupational safety risk management process in industries. In this article, we performed a survey to elicit the relative importance for identified OSRA tasks to enable an in-depth evaluation of the quality of risk assessments related to occupational safety aspects on industrial sites. The survey involved defining a questionnaire with the most important elements (tasks) for OSRA quality assessment, which was then presented to safety experts in the mining, electrical power production, transportation, and petrochemical industries. With this work, we expect to contribute to the main question of OSRA in industries: "What constitutes a good occupational safety risk assessment?" The results obtained from the questionnaire showed that experts agree with the proposed OSRA process decomposition in steps and tasks (taxonomy) and also with the importance of assigning weights to obtain knowledge about OSRA task relevance. The knowledge gained will enable us, in the near future, to build a framework to evaluate OSRA quality for industrial sites. © 2012 Society for Risk Analysis.

  6. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials.

    Science.gov (United States)

    Bos, Peter M J; Gottardo, Stefania; Scott-Fordsmand, Janeck J; van Tongeren, Martie; Semenzin, Elena; Fernandes, Teresa F; Hristozov, Danail; Hund-Rinke, Kerstin; Hunt, Neil; Irfan, Muhammad-Adeel; Landsiedel, Robert; Peijnenburg, Willie J G M; Sánchez Jiménez, Araceli; van Kesteren, Petra C E; Oomen, Agnes G

    2015-11-27

    An engineered nanomaterial (ENM) may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA) a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing) a base set of information is considered, relevant exposure scenarios (RESs) are identified and the scope for Phase 2 (Risk assessment) is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  7. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials

    Directory of Open Access Journals (Sweden)

    Peter M. J. Bos

    2015-11-01

    Full Text Available An engineered nanomaterial (ENM may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing a base set of information is considered, relevant exposure scenarios (RESs are identified and the scope for Phase 2 (Risk assessment is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  8. Data validation and risk assessment -- some pitfalls when evaluating VOC measurements

    International Nuclear Information System (INIS)

    Korte, N.; Kearl, P.

    1993-01-01

    Data validation, as described in Environmental Protection Agency (EPA) protocols under the Contract Laboratory Program (CLP), yields false confidence in the data and drives up costs while providing little benefit (Korte and Brown 1992). Commonly, these data are then used to perform a risk assessment. Much of the published guidance for risk assessments in and arid soils is inadequate because it does not take into account vapor migration due to density-driven flow (Korte and others 1992). Investigations into both of these problems have been performed by personnel of Oak Ridge National Laboratory (ORNL) and are described in this presentation

  9. Business risks, functions, methods of assessment and ways to reduce risk

    Directory of Open Access Journals (Sweden)

    A.V. Mihalchuk

    2015-06-01

    Full Text Available For successful existence in a market economy entrepreneur have to take bold actions, and this increases the risk. The article describes the concept of entrepreneurship and business risk, positive and negative aspects of functions of risk in business. Therefore, it is necessary to assess the risk properly and be able to manage it to achieve the most effective results in the market. In market conditions the problem of assessing and accounting market becomes independent theoretical and practical significance as an important component of the theory and practice of management. Risk - a key element of business activities. Development of risk situations can lead to both the occurrence of adverse effects (losses, lost profits, and positive results for a company in the form of increased profit. This article describes: the concept of entrepreneurship, risk and business risks, characteristic of positive and negative aspects of risk functions in business, methods of assessment and risk reduction, shows formulae and examples you can use to assess risk in an enterprise. Analyzing already established methods of risk assessment a number of rules were proposed in order to reduce business risk.

  10. Risk Assessment

    OpenAIRE

    Hrdová, Edita

    2012-01-01

    This diploma thesis is focused on companies risk evaluation before endorsement of Loan deriving from business relationships. The aim of this thesis is not only to describe individual steps of risk assessment, but also perfom analysis of particular companies based on available data, i.e. Balance sheet, Profit and Loss statement and external rating and after that propose solution for each company. My analysis will be based on theoretical knowledge, further on experience related to my job role a...

  11. Effect of a multifactorial fall-and-fracture risk assessment and management program on gait and balance performances and disability in hospitalized older adults: a controlled study.

    Science.gov (United States)

    Trombetti, A; Hars, M; Herrmann, F; Rizzoli, R; Ferrari, S

    2013-03-01

    This controlled intervention study in hospitalized oldest old adults showed that a multifactorial fall-and-fracture risk assessment and management program, applied in a dedicated geriatric hospital unit, was effective in improving fall-related physical and functional performances and the level of independence in activities of daily living in high-risk patients. Hospitalization affords a major opportunity for interdisciplinary cooperation to manage fall-and-fracture risk factors in older adults. This study aimed at assessing the effects on physical performances and the level of independence in activities of daily living (ADL) of a multifactorial fall-and-fracture risk assessment and management program applied in a geriatric hospital setting. A controlled intervention study was conducted among 122 geriatric inpatients (mean ± SD age, 84 ± 7 years) admitted with a fall-related diagnosis. Among them, 92 were admitted to a dedicated unit and enrolled into a multifactorial intervention program, including intensive targeted exercise. Thirty patients who received standard usual care in a general geriatric unit formed the control group. Primary outcomes included gait and balance performances and the level of independence in ADL measured 12 ± 6 days apart. Secondary outcomes included length of stay, incidence of in-hospital falls, hospital readmission, and mortality rates. Compared to the usual care group, the intervention group had significant improvements in Timed Up and Go (adjusted mean difference [AMD] = -3.7s; 95 % CI = -6.8 to -0.7; P = 0.017), Tinetti (AMD = -1.4; 95 % CI = -2.1 to -0.8; P fall-and-fracture risk-based intervention program, applied in a dedicated geriatric hospital unit, was effective and more beneficial than usual care in improving physical parameters related to the risk of fall and disability among high-risk oldest old patients.

  12. Anthropic Risk Assessment on Biodiversity

    Science.gov (United States)

    Piragnolo, M.; Pirotti, F.; Vettore, A.; Salogni, G.

    2013-01-01

    This paper presents a methodology for risk assessment of anthropic activities on habitats and species. The method has been developed for Veneto Region, in order to simplify and improve the quality of EIA procedure (VINCA). Habitats and species, animals and plants, are protected by European Directive 92/43/EEC and 2009/147/EC but they are subject at hazard due to pollution produced by human activities. Biodiversity risks may conduct to deterioration and disturbance in ecological niches, with consequence of loss of biodiversity. Ecological risk assessment applied on Natura 2000 network, is needed to best practice of management and monitoring of environment and natural resources. Threats, pressure and activities, stress and indicators may be managed by geodatabase and analysed using GIS technology. The method used is the classic risk assessment in ecological context, and it defines the natural hazard as influence, element of risk as interference and vulnerability. Also it defines a new parameter called pressure. It uses risk matrix for the risk analysis on spatial and temporal scale. The methodology is qualitative and applies the precautionary principle in environmental assessment. The final product is a matrix which excludes the risk and could find application in the development of a territorial information system.

  13. Risk assessment and the environment

    International Nuclear Information System (INIS)

    Fisk, D.J.

    1992-01-01

    This paper reviews the use of risk assessment techniques in the field of environment protection. I will argue that in some important instances the development of environment policy has been a source of fruitful development of a risk based methodologies. In other cases the importation of risk assessment techniques has proved much more problematic. As the scope of environmental regulation increases so does the possibility of inconsistent and arbitrary solutions to problems. The need for a more systematic approach to the development of environmental regulation has never been stronger, so it is important to understand the reasons for the mixed success of risk assessment. This applies equally to those nations with long traditions of the regulation of private sector industry and those just beginning on this course. The way ahead may be to extend our ideas of how to express risk and uncertainty. Some of the recent cause celebres of environment policy show this challenge very clearly. As an example, this paper will look at the problem of assessing the risk of man-made climate change

  14. Risk assessment and the environment

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, D J [Department of the Environment (United Kingdom)

    1992-07-01

    This paper reviews the use of risk assessment techniques in the field of environment protection. I will argue that in some important instances the development of environment policy has been a source of fruitful development of a risk based methodologies. In other cases the importation of risk assessment techniques has proved much more problematic. As the scope of environmental regulation increases so does the possibility of inconsistent and arbitrary solutions to problems. The need for a more systematic approach to the development of environmental regulation has never been stronger, so it is important to understand the reasons for the mixed success of risk assessment. This applies equally to those nations with long traditions of the regulation of private sector industry and those just beginning on this course. The way ahead may be to extend our ideas of how to express risk and uncertainty. Some of the recent cause celebres of environment policy show this challenge very clearly. As an example, this paper will look at the problem of assessing the risk of man-made climate change.

  15. Nuclear insurance risk assessment using risk-based methodology

    International Nuclear Information System (INIS)

    Wendland, W.G.

    1992-01-01

    This paper presents American Nuclear Insurers' (ANI's) and Mutual Atomic Energy Liability Underwriters' (MAELU's) process and experience for conducting nuclear insurance risk assessments using a risk-based methodology. The process is primarily qualitative and uses traditional insurance risk assessment methods and an approach developed under the auspices of the American Society of Mechanical Engineers (ASME) in which ANI/MAELU is an active sponsor. This process assists ANI's technical resources in identifying where to look for insurance risk in an industry in which insurance exposure tends to be dynamic and nonactuarial. The process is an evolving one that also seeks to minimize the impact on insureds while maintaining a mutually agreeable risk tolerance

  16. A probabilistic seismic risk assessment procedure for nuclear power plants: (II) Application

    Science.gov (United States)

    Huang, Y.-N.; Whittaker, A.S.; Luco, N.

    2011-01-01

    This paper presents the procedures and results of intensity- and time-based seismic risk assessments of a sample nuclear power plant (NPP) to demonstrate the risk-assessment methodology proposed in its companion paper. The intensity-based assessments include three sets of sensitivity studies to identify the impact of the following factors on the seismic vulnerability of the sample NPP, namely: (1) the description of fragility curves for primary and secondary components of NPPs, (2) the number of simulations of NPP response required for risk assessment, and (3) the correlation in responses between NPP components. The time-based assessment is performed as a series of intensity-based assessments. The studies illustrate the utility of the response-based fragility curves and the inclusion of the correlation in the responses of NPP components directly in the risk computation. ?? 2011 Published by Elsevier B.V.

  17. A Risk-based Assessment And Management Framework For Multipollutant Air Quality

    Science.gov (United States)

    Frey, H. Christopher; Hubbell, Bryan

    2010-01-01

    The National Research Council recommended both a risk- and performance-based multipollutant approach to air quality management. Specifically, management decisions should be based on minimizing the exposure to, and risk of adverse effects from, multiple sources of air pollution and that the success of these decisions should be measured by how well they achieved this objective. We briefly describe risk analysis and its application within the current approach to air quality management. Recommendations are made as to how current practice could evolve to support a fully risk- and performance-based multipollutant air quality management system. The ability to implement a risk assessment framework in a credible and policy-relevant manner depends on the availability of component models and data which are scientifically sound and developed with an understanding of their application in integrated assessments. The same can be said about accountability assessments used to evaluate the outcomes of decisions made using such frameworks. The existing risk analysis framework, although typically applied to individual pollutants, is conceptually well suited for analyzing multipollutant management actions. Many elements of this framework, such as emissions and air quality modeling, already exist with multipollutant characteristics. However, the framework needs to be supported with information on exposure and concentration response relationships that result from multipollutant health studies. Because the causal chain that links management actions to emission reductions, air quality improvements, exposure reductions and health outcomes is parallel between prospective risk analyses and retrospective accountability assessments, both types of assessment should be placed within a single framework with common metrics and indicators where possible. Improvements in risk reductions can be obtained by adopting a multipollutant risk analysis framework within the current air quality management

  18. Risk assessment for halogenated solvents

    International Nuclear Information System (INIS)

    Travis, C.C.

    1988-01-01

    A recent development in the cancer risk area is the advent of biologically based pharmacokinetic and pharmacodynamic models. These models allow for the incorporation of biological and mechanistic data into the risk assessment process. These advances will not only improve the risk assessment process for halogenated solvents but will stimulate and guide basic research in the biological area

  19. Bioavailability in ecological risk. Assessment for radionuclides

    International Nuclear Information System (INIS)

    Garnier-Laplace, J.; Gilbin, R.; Della-Vedova, C.; Adam, C.; Simon, O.; Denison, F.; Beaugelin, K.

    2005-01-01

    The guidance for performing Ecological Risk Assessments (ERA) in Europe has been published in 2003 in the EC's Technical Guidance Document. This document constitutes the official reference in which current water quality standards and risk assessment approach for metals/metalloids are still mainly based on total or dissolved concentrations. However, it has been recognized that accurate assessment of the bio-available metal fraction is crucial, even if the way to incorporate bioavailability into these procedures is still under discussion. The speciation of a pollutant in the exposure medium is the first factor that regulates its bioavailability and consequently its bioaccumulation and the induced biological effects. Therefore, within any ecological risk assessment, bioavailability has obvious implications: firstly in exposure analysis which aim is to determine Predicted Exposure Concentration (PEC); secondly in effect analysis while deriving the so-called Predicted No-Effect Concentrations (PNEC) as toxicity is often linked to the amount of the contaminant incorporated into the tissues of biota. Similarities between metals/metalloids and radionuclides are limited to the biogeochemical behaviour of the element considered and to the need to use bioavailability models. In addition, for radionuclides, emitted ionising radiations (type and energy) need to be taken into account for both exposure and effect analyses whilst performing dosimetric calculations appropriate to the exposure scenarios. A methodology for properly implementing bioavailability models is explained and illustrated for aqueous U(VI), starting from a comprehensive review of the thermodynamic data relevant to environmentally-realistic physico-chemical conditions. Then, the use of thermodynamic equilibrium modelling as a tool for interpreting the bioavailability of U(VI) is presented. Using a systematic approach, different bioavailability models of increasing complexity were tested to model U bio

  20. Nutritional risk assessment in critically ill cancer patients: systematic review

    Science.gov (United States)

    Fruchtenicht, Ana Valéria Gonçalves; Poziomyck, Aline Kirjner; Kabke, Geórgia Brum; Loss, Sérgio Henrique; Antoniazzi, Jorge Luiz; Steemburgo, Thais; Moreira, Luis Fernando

    2015-01-01

    Objective To systematically review the main methods for nutritional risk assessment used in critically ill cancer patients and present the methods that better assess risks and predict relevant clinical outcomes in this group of patients, as well as to discuss the pros and cons of these methods according to the current literature. Methods The study consisted of a systematic review based on analysis of manuscripts retrieved from the PubMed, LILACS and SciELO databases by searching for the key words “nutritional risk assessment”, “critically ill” and “cancer”. Results Only 6 (17.7%) of 34 initially retrieved papers met the inclusion criteria and were selected for the review. The main outcomes of these studies were that resting energy expenditure was associated with undernourishment and overfeeding. The high Patient-Generated Subjective Global Assessment score was significantly associated with low food intake, weight loss and malnutrition. In terms of biochemical markers, higher levels of creatinine, albumin and urea were significantly associated with lower mortality. The worst survival was found for patients with worse Eastern Cooperative Oncologic Group - performance status, high Glasgow Prognostic Score, low albumin, high Patient-Generated Subjective Global Assessment score and high alkaline phosphatase levels. Geriatric Nutritional Risk Index values < 87 were significantly associated with mortality. A high Prognostic Inflammatory and Nutritional Index score was associated with abnormal nutritional status in critically ill cancer patients. Among the reviewed studies that examined weight and body mass index alone, no significant clinical outcome was found. Conclusion None of the methods reviewed helped to define risk among these patients. Therefore, assessment by a combination of weight loss and serum measurements, preferably in combination with other methods using scores such as Eastern Cooperative Oncologic Group - performance status, Glasgow Prognostic

  1. Risk assessment: An employer's perspective

    International Nuclear Information System (INIS)

    Williams, K.C.

    1992-01-01

    There is no question that a careful assessment of risk is essential for safe industrial operations. For that reason, a thoughtful analysis of the effectiveness of available risk assessment technologies is prerequisite for responsible corporate decision making. An 'employer's' perspective on risk assessment cannot be constrained by any artificial restrictions which that term may imply. In reality, all those who are involved in the execution of an industrial enterprise: managers, regulators, the affected public, and especially those employees exposed to hazards, are necessarily partners in assessment of risk. The perspective of this paper is that of the oil and gas industry, in which the author's organization, Exxon Company, International, participates. The paper addresses what Exxon requires to assess and manage risk in its worldwide operations. The author is aware, however, through contacts with industry colleagues, that some of Exxon's initiatives are representative of similar actions being taken by others. 1992 is the European Year of Safety, Health and Hygiene, coinciding with the United Kingdom's Presidency of the European Council. It is also the year in which new 'goal-setting' regulations covering safety in the U.K. offshore oil industry were put forward by the Health and Safety Commission. These regulations, based largely on Lord Cullen's recommendations following the Piper Alpha tragedy, set the pace for safety in the British North Sea and will significantly impact the safety of offshore oil installations worldwide. The requirement for risk assessment, using a systematic process of analysing and evaluating risk, is a key component of this safety regime

  2. Risk assessment: An employer's perspective

    Energy Technology Data Exchange (ETDEWEB)

    Williams, K C [Exxon International (United States)

    1992-07-01

    There is no question that a careful assessment of risk is essential for safe industrial operations. For that reason, a thoughtful analysis of the effectiveness of available risk assessment technologies is prerequisite for responsible corporate decision making. An 'employer's' perspective on risk assessment cannot be constrained by any artificial restrictions which that term may imply. In reality, all those who are involved in the execution of an industrial enterprise: managers, regulators, the affected public, and especially those employees exposed to hazards, are necessarily partners in assessment of risk. The perspective of this paper is that of the oil and gas industry, in which the author's organization, Exxon Company, International, participates. The paper addresses what Exxon requires to assess and manage risk in its worldwide operations. The author is aware, however, through contacts with industry colleagues, that some of Exxon's initiatives are representative of similar actions being taken by others. 1992 is the European Year of Safety, Health and Hygiene, coinciding with the United Kingdom's Presidency of the European Council. It is also the year in which new 'goal-setting' regulations covering safety in the U.K. offshore oil industry were put forward by the Health and Safety Commission. These regulations, based largely on Lord Cullen's recommendations following the Piper Alpha tragedy, set the pace for safety in the British North Sea and will significantly impact the safety of offshore oil installations worldwide. The requirement for risk assessment, using a systematic process of analysing and evaluating risk, is a key component of this safety regime.

  3. INSTRUMENTS OF HIGH RISK SEXUAL BEHAVIOR ASSESSMENT: A SYSTEMATIC REVIEW.

    Science.gov (United States)

    Mirzaei, Mojtaba; Ahmadi, Khodabakhsh; Saadat, Seyed-Hassan; Ramezani, Mohammad Arash

    2016-02-01

    Sexual behavior is a complex activity affecting all aspects of human's life. Risky sexual behaviors impose negative outcomes on family, relationships and health. Unsafe sex is the second most leading cause of disability adjusted life years worldwide. Valid and reliable tools for assessment of risky sexual behaviors are necessary for implementing preventive measures. we searched Medline and the Cochrane Library of Systematic Reviews, with the keywords of "risky sexual behavior assessment", "sexual risk assessment", "high risk sexual behavior", "sexual risk taking". By reviewing references of the articles, some complementary studies were added. Assessment can be performed by questionnaire or non-questionnaire instruments. Questionnaires vary depending on their target population, evaluation of risky sexual behavior as a whole or focusing on an associated risk factor. In order to avoid usual biases in self reports, objective biomarker assessment of unprotected sex are employed. These markers include prostate specific antigen, chromosome Y DNA and Seminogelin. Risky sexual behavior can be assessed by various subjective and objective methods. While self-reports are more feasible, objective methods offer a higher degree of reliability. Further studies for finding more feasible methods of using biomarkers are recommended.

  4. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing the extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.

  5. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing the extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ''baseline'' risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site

  6. Clinical risk assessment in intensive care unit

    Directory of Open Access Journals (Sweden)

    Saeed Asefzadeh

    2013-01-01

    Full Text Available Background: Clinical risk management focuses on improving the quality and safety of health care services by identifying the circumstances and opportunities that put patients at risk of harm and acting to prevent or control those risks. The goal of this study is to identify and assess the failure modes in the ICU of Qazvin′s Social Security Hospital (Razi Hospital through Failure Mode and Effect Analysis (FMEA. Methods: This was a qualitative-quantitative research by Focus Discussion Group (FDG performed in Qazvin Province, Iran during 2011. The study population included all individuals and owners who are familiar with the process in ICU. Sampling method was purposeful and the FDG group members were selected by the researcher. The research instrument was standard worksheet that has been used by several researchers. Data was analyzed by FMEA technique. Results: Forty eight clinical errors and failure modes identified, results showed that the highest risk probability number (RPN was in respiratory care "Ventilator′s alarm malfunction (no alarm" with the score 288, and the lowest was in gastrointestinal "not washing the NG-Tube" with the score 8. Conclusions: Many of the identified errors can be prevented by group members. Clinical risk assessment and management is the key to delivery of effective health care.

  7. RELEVANCE OF PROCESS RISK ASSESSMENT IN AIRLINES

    OpenAIRE

    Oksana G. Feoktistova; Igor K. Turkin; Sergey V. Barinov

    2017-01-01

    The notion of “the concept on assumed risk” that took over from the outdated concept of absolute security is analyzed, the increasing significance of operating risk assessment at the present stage is noted. Some basic risk assessment techniques are considered. Matrix technique of risk assessment is considered more thoroughly, and it may be used in risk assessment of airlines in the context of labour protection management system.The ability to correctly assess risks and develop appropriate pre...

  8. An abuse of risk assessment: how regulatory agencies improperly adopted LNT for cancer risk assessment.

    Science.gov (United States)

    Calabrese, Edward J

    2015-04-01

    The Genetics Panel of the National Academy of Sciences' Committee on Biological Effects of Atomic Radiation (BEAR) recommended the adoption of the linear dose-response model in 1956, abandoning the threshold dose-response for genetic risk assessments. This recommendation was quickly generalized to include somatic cells for cancer risk assessment and later was instrumental in the adoption of linearity for carcinogen risk assessment by the Environmental Protection Agency. The Genetics Panel failed to provide any scientific assessment to support this recommendation and refused to do so when later challenged by other leading scientists. Thus, the linearity model used in cancer risk assessment was based on ideology rather than science and originated with the recommendation of the NAS BEAR Committee Genetics Panel. Historical documentation in support of these conclusions is provided in the transcripts of the Panel meetings and in previously unexamined correspondence among Panel members.

  9. A framework for combining social impact assessment and risk assessment

    NARCIS (Netherlands)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify

  10. A framework for combining social impact assessment and risk assessment

    NARCIS (Netherlands)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify

  11. Risk indices in comparative risk assessment studies

    International Nuclear Information System (INIS)

    Hubert, P.

    1984-01-01

    More than a decade ago the development of comparative risk assessment studies aroused overwhelming interest. There was no doubt that data on the health and safety aspects of energy systems would greatly benefit, or even end, the debate on nuclear energy. Although such attempts are still strongly supported, the rose-coloured expectations of the early days have faded. The high uncertainties, and the contradictory aspect, of the first results might explain this evolution. The loose connection between the range of computed risk indices and the questions on which the debate was focused is another reason for this decline in interest. Important research work is being carried out aiming at reducing the different kinds of uncertainties. Rather than the uncertainties, the paper considers the meaning of available risk indices and proposes more significant indices with respect to the goals of risk assessment. First, the indices which are of frequent use in comparative studies are listed. The stress is put on a French comparative study from which most examples are drawn. Secondly, the increase in magnitude of the indices and the decrease in the attributability of the risk to a given system is shown to be a consequence of the trend towards more comprehensive analyses. Thirdly, the ambiguity of such indices as the collective occupational risk is underlined, and a possible solution is suggested. Whenever risk assessments are related to pragmatic decision making problems it is possible to find satisfactory risk indices. The development of cost-effectiveness analyses and the proposals for quantitative safety goals clearly demonstrate this point. In the field of comparison of social impacts some proposals are made, but there remain some gaps still to be filled. (author)

  12. Development of a Quantitative Framework for Regulatory Risk Assessments: Probabilistic Approaches

    International Nuclear Information System (INIS)

    Wilmot, R.D.

    2003-11-01

    The Swedish regulators have been active in the field of performance assessment for many years and have developed sophisticated approaches to the development of scenarios and other aspects of assessments. These assessments have generally used dose as the assessment end-point and have been based on deterministic calculations. Recently introduced Swedish regulations have introduced a risk criterion for radioactive waste disposal: the annual risk of harmful effects after closure of a disposal facility should not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. A recent review of the overall structure of risk assessments in safety cases concluded that there are a number of decisions and assumptions in the development of a risk assessment methodology that could potentially affect the calculated results. Regulatory understanding of these issues, potentially supported by independent calculations, is important in preparing for review of a proponent's risk assessment. One approach to evaluating risk in performance assessments is to use the concept of probability to express uncertainties, and to propagate these probabilities through the analysis. This report describes the various approaches available for undertaking such probabilistic analyses, both as a means of accounting for uncertainty in the determination of risk and more generally as a means of sensitivity and uncertainty analysis. The report discusses the overall nature of probabilistic analyses and how they are applied to both the calculation of risk and sensitivity analyses. Several approaches are available, including differential analysis, response surface methods and simulation. Simulation is the approach most commonly used, both in assessments for radioactive waste disposal and in other subject areas, and the report describes the key stages of this approach in detail. Decisions relating to the development of input PDFs, sampling methods (including approaches to the treatment

  13. Aspects regarding explosion risk assessment

    Directory of Open Access Journals (Sweden)

    Părăian Mihaela

    2017-01-01

    Full Text Available Explosive risk occurs in all activities involving flammable substances in the form of gases, vapors, mists or dusts which, in mixture with air, can generate an explosive atmosphere. As explosions can cause human losses and huge material damage, the assessment of the explosion risk and the establishment of appropriate measures to reduce it to acceptable levels according to the standards and standards in force is of particular importance for the safety and health of people and goods.There is no yet a recognized method of assessing the explosion risk, but regardless of the applied method, the likelihood of an explosive atmosphere occurrence has to be determined, together with the occurrence of an efficient ignition source and the magnitude of foreseeable consequences. In assessment processes, consequences analysis has a secondary importance since it’s likely that explosions would always involve considerable damage, starting from important material damages and up to human damages that could lead to death.The purpose of the work is to highlight the important principles and elements to be taken into account for a specific risk assessment. An essential element in assessing the risk of explosion in workplaces where explosive atmospheres may occur is technical installations and personal protective equipment (PPE that must be designed, manufactured, installed and maintained so that they cannot generate a source of ignition. Explosion prevention and protection requirements are governed by specific norms and standards, and a main part of the explosion risk assessment is related to the assessment of the compliance of the equipment / installation with these requirements.

  14. Hanford Waste Vitrification Project Building limited scope risk assessment

    International Nuclear Information System (INIS)

    Braun, D.J.; Lindberg, S.E.; Reardon, M.F.; Wilson, G.P.

    1992-10-01

    A limited scope risk assessment was performed on the preliminary design of a high-level waste interim storage facility. The Canister Storage Building (CSB) facility will be built to support remediation at the US Department of Energy Hanford Site in Washington State. The CSB will be part of the support facilities for a high level Hanford Waste Vitrification Plant (HWVP). The limited scope risk assessment is based on a preliminary design which uses forced air circulation systems to move air through the building vault. The current building design calls for natural circulation to move air through the building vault

  15. Update earthquake risk assessment in Cairo, Egypt

    Science.gov (United States)

    Badawy, Ahmed; Korrat, Ibrahim; El-Hadidy, Mahmoud; Gaber, Hanan

    2017-07-01

    The Cairo earthquake (12 October 1992; m b = 5.8) is still and after 25 years one of the most painful events and is dug into the Egyptians memory. This is not due to the strength of the earthquake but due to the accompanied losses and damages (561 dead; 10,000 injured and 3000 families lost their homes). Nowadays, the most frequent and important question that should rise is "what if this earthquake is repeated today." In this study, we simulate the same size earthquake (12 October 1992) ground motion shaking and the consequent social-economic impacts in terms of losses and damages. Seismic hazard, earthquake catalogs, soil types, demographics, and building inventories were integrated into HAZUS-MH to produce a sound earthquake risk assessment for Cairo including economic and social losses. Generally, the earthquake risk assessment clearly indicates that "the losses and damages may be increased twice or three times" in Cairo compared to the 1992 earthquake. The earthquake risk profile reveals that five districts (Al-Sahel, El Basateen, Dar El-Salam, Gharb, and Madinat Nasr sharq) lie in high seismic risks, and three districts (Manshiyat Naser, El-Waily, and Wassat (center)) are in low seismic risk level. Moreover, the building damage estimations reflect that Gharb is the highest vulnerable district. The analysis shows that the Cairo urban area faces high risk. Deteriorating buildings and infrastructure make the city particularly vulnerable to earthquake risks. For instance, more than 90 % of the estimated buildings damages are concentrated within the most densely populated (El Basateen, Dar El-Salam, Gharb, and Madinat Nasr Gharb) districts. Moreover, about 75 % of casualties are in the same districts. Actually, an earthquake risk assessment for Cairo represents a crucial application of the HAZUS earthquake loss estimation model for risk management. Finally, for mitigation, risk reduction, and to improve the seismic performance of structures and assure life safety

  16. Risk assessment to determine the advisability of seismic trip systems

    International Nuclear Information System (INIS)

    Cummings, G.E.; Wells, J.E.

    1977-01-01

    Seismic trip (scram) systems have been used for many years on certain research, test, and production reactors, but not on commercial power reactors. An assessment is made of the risks associated with the presence and absence of such trip systems on power reactors. An attempt was made to go beyond the reactor per se and to consider the risks to society as a whole; for example, the advantages of tripping to avoid an earthquake-caused accident were weighed against the disadvantages associated with interrupting electric power in a time when it would be needed for emergency services. The comparative risk assessment was performed by means of fault tree analysis

  17. Chlorine transportation risk assessment

    International Nuclear Information System (INIS)

    Lautkaski, Risto; Mankamo, Tuomas.

    1977-02-01

    An assessment has been made on the toxication risk of the population due to the bulk rail transportation of liquid chlorine in Finland. Fourteen typical rail accidents were selected and their probability was estimated using the accident file of the Finnish State Railways. The probability of a chlorine leak was assessed for each type of accident separately using four leak size categories. The assessed leakage probability was dominated by station accidents, especially by collisions of a chlorine tanker and a locomotive. Toxication hazard areas were estimated for the leak categories. A simple model was constructed to describe the centring of the densely populated areas along the railway line. A comparison was made between the obtained risk and some other risks including those due to nuclear reactor accidents. (author)

  18. Online application of a risk management system for risk assessment and monitoring at NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Wang, Wenlin, E-mail: wlwang0618@126.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Li, Fengjun, E-mail: leefengjun@163.com [China Nuclear Power Engineering Co. Ltd (China)

    2016-08-15

    Highlights: • A generic GO-FLOW modeling structure is proposed for easily Living PSA development and analysis. • Hierarchical and modularized scheme is applied in the development of Living PSA models and database. • A risk management system is developed by GO-FLOW method. • Functional testing is conducted on the risk management system for performance evaluation. • The fast solution time derived from Living PSA application is supportive in plant safety management. - Abstract: The paper presents a risk management system on the basis of Living PSA models which are developed under a proposed generic GO-FLOW modeling method with a hierarchical and modular structure. The design of the risk management system is aiming at assisting plant personnel to manage maintenance plan and system configuration, and conduct system reliability monitoring, risk monitoring and risk management quickly and conveniently through graphical user interfaces without going deep into the details of building, updating and analyzing reliability and risk models. The performance of the proposed risk management system was tested on a full-scale simulator of PWR nuclear power plant and demonstrated that the fast solution time derived from utilization of hierarchical and modularized Living PSA models is strongly supportive for instantaneous risk assessment as well as for daily risk management at NPPs.

  19. Probabilistic risk assessment, Volume I

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    This book contains 158 papers presented at the International Topical Meeting on Probabilistic Risk Assessment held by the American Nuclear Society (ANS) and the European Nuclear Society (ENS) in Port Chester, New York in 1981. The meeting was second in a series of three. The main focus of the meeting was on the safety of light water reactors. The papers discuss safety goals and risk assessment. Quantitative safety goals, risk assessment in non-nuclear technologies, and operational experience and data base are also covered. Included is an address by Dr. Chauncey Starr

  20. Risk assessment in maritime transportation

    International Nuclear Information System (INIS)

    Soares, C. Guedes; Teixeira, A.P.

    2001-01-01

    A review is presented of different approaches to quantify the risk in maritime transportation. The discussion of several accident statistics provides a global assessment of the risk levels and its differentiation in ship types and main types of ship losses. Early studies in the probability of ship loss by foundering and capsizing are reviewed. The approaches used to assess the risk of structural design are addressed. Finally a brief account is given of recent development of using formal safety assessments to support decision making on legislation applicable internationally to maritime transportation

  1. Framework for ecological risk assessment

    International Nuclear Information System (INIS)

    Rodier, D.; Norton, S.

    1992-02-01

    Increased interest in ecological issues such as global climate change, habitat loss, acid deposition, reduced biological diversity, and the ecological impacts of pesticides and toxic chemicals prompts this U.S. Environmental Protection Agency (EPA) report, A Framework for Ecological Risk Assessment ('Framework Report'). The report describes basic elements, or a framework, for evaluating scientific information on the adverse effects of physical and chemical stressors on the environment. The framework offers starting principles and a simple structure as guidance for current ecological risk assessments and as a foundation for future EPA proposals for risk assessment guidelines

  2. The American Petroleum Institute's Decision Support System for performing exposure and risk assessments

    International Nuclear Information System (INIS)

    Spence, L.R.

    1994-01-01

    The author has developed the American Petroleum Institute's (API) Exposure and Risk Assessment Decision Support System (DSS) to assist environmental professionals in estimating human exposure and risk from sites contaminated with petroleum hydrocarbons. The DSS is a valuable, user-friendly tool that can be used to (1) estimate site-specific risks, (2) identify the need for site remediation, (3) develop and negotiate site-specific cleanup levels with regulatory agencies, and (4) efficiently and effectively evaluate the effect of parameter uncertainty and variability on estimated risk. API DSS Version 1.0 consists of four modules. Specifically, the Development of Risk Scenario module allows the user to develop a conceptual model for estimating the risk. The Fate and Transport module includes a number of contaminant fate and transport models to estimate receptor point concentrations using site-specific hydrogeological and meteorological data entered by the user. The Chemical Intake and Risk Calculation module uses estimated or user-entered receptor point concentrations to estimate chemical intake by a human receptor for several different exposure routes. Finally, the Risk Presentation module allows the user to view the results of the analysis in tabular and graphical formats. The DSS includes chemical databases for 25 hydrocarbons containing transport and toxicity information. These databases may be expanded to include many additional (non-hydrocarbon) chemicals. The computational modules of the DSS can be implemented in either a deterministic or a Monte Carlo simulation mode. The latter is used to quantify the uncertainty in the exposure and risk results due to uncertainty in the input parameters

  3. Risk assessment instruments in clinical practice.

    Science.gov (United States)

    Côté, Gilles; Crocker, Anne G; Nicholls, Tonia L; Seto, Michael C

    2012-04-01

    To determine whether the items in one of the most widely validated instruments of violence risk assessment, the Historical-Clinical-Risk Management-20 (HCR-20), are used in review board hearings to assess the risk of violence by people found Not Criminally Responsible on account of Mental Disorder (NCRMD). This study was conducted from October 2004 to August 2006 in Quebec's sole forensic psychiatric hospital and 2 large civil psychiatric hospitals designated for the care of people declared NCRMD in the Montreal metropolitan area. The risk assessments presented by clinicians at annual review board hearings and the boards' rationale for the release or detention of people found NCRMD were contrasted with the risk assessments conducted by the research team using the HCR-20. The final sample was comprised of 96 men. Very few of the risk factors identified by prior research (HCR-20 items) were mentioned in the hearing process, whether in clinical reports, discussions during the hearing, or in the disposition justification. The findings confirm that there remains a significant gap between research evidence and risk assessment practice.

  4. Cost-effectiveness of electronic training in domestic violence risk assessment: ODARA 101.

    Science.gov (United States)

    Hilton, N Zoe; Ham, Elke

    2015-03-01

    The need for domestic violence training has increased with the development of evidence-based risk assessment tools, which must be scored correctly for valid application. Emerging research indicates that training in domestic violence risk assessment can increase scoring accuracy, but despite the increasing popularity of electronic training, it is not yet known whether it can be an effective method of risk assessment training. In the present study, 87 assessors from various professions had training in the Ontario Domestic Assault Risk Assessment either face-to-face or using an electronic training program. The two conditions were equally effective, as measured by performance on a post-training skill acquisition test. Completion rates were 100% for face-to-face and 86% for electronic training, an improvement over a previously evaluated manual-only condition. The estimated per-trainee cost of electronic training was one third that of face-to-face training and expected to decrease. More rigorous evaluations of electronic training for risk assessment are recommended. © The Author(s) 2014.

  5. Reevaluating Interrater Reliability in Offender Risk Assessment

    NARCIS (Netherlands)

    van der Knaap, L.M.; Leenarts, L.E.W.; Born, M.P.; Oosterveld, P.

    2012-01-01

    Offender risk and needs assessment, one of the pillars of the risk-need-responsivity model of offender rehabilitation, usually depends on raters assessing offender risk and needs. The few available studies of interrater reliability in offender risk assessment are, however, limited in the

  6. Ecosystem services as assessment endpoints for ecological risk assessment.

    Science.gov (United States)

    Munns, Wayne R; Rea, Anne W; Suter, Glenn W; Martin, Lawrence; Blake-Hedges, Lynne; Crk, Tanja; Davis, Christine; Ferreira, Gina; Jordan, Steve; Mahoney, Michele; Barron, Mace G

    2016-07-01

    Ecosystem services are defined as the outputs of ecological processes that contribute to human welfare or have the potential to do so in the future. Those outputs include food and drinking water, clean air and water, and pollinated crops. The need to protect the services provided by natural systems has been recognized previously, but ecosystem services have not been formally incorporated into ecological risk assessment practice in a general way in the United States. Endpoints used conventionally in ecological risk assessment, derived directly from the state of the ecosystem (e.g., biophysical structure and processes), and endpoints based on ecosystem services serve different purposes. Conventional endpoints are ecologically important and susceptible entities and attributes that are protected under US laws and regulations. Ecosystem service endpoints are a conceptual and analytical step beyond conventional endpoints and are intended to complement conventional endpoints by linking and extending endpoints to goods and services with more obvious benefit to humans. Conventional endpoints can be related to ecosystem services even when the latter are not considered explicitly during problem formulation. To advance the use of ecosystem service endpoints in ecological risk assessment, the US Environmental Protection Agency's Risk Assessment Forum has added generic endpoints based on ecosystem services (ES-GEAE) to the original 2003 set of generic ecological assessment endpoints (GEAEs). Like conventional GEAEs, ES-GEAEs are defined by an entity and an attribute. Also like conventional GEAEs, ES-GEAEs are broadly described and will need to be made specific when applied to individual assessments. Adoption of ecosystem services as a type of assessment endpoint is intended to improve the value of risk assessment to environmental decision making, linking ecological risk to human well-being, and providing an improved means of communicating those risks. Integr Environ Assess Manag

  7. Korean risk assessment model for breast cancer risk prediction.

    Science.gov (United States)

    Park, Boyoung; Ma, Seung Hyun; Shin, Aesun; Chang, Myung-Chul; Choi, Ji-Yeob; Kim, Sungwan; Han, Wonshik; Noh, Dong-Young; Ahn, Sei-Hyun; Kang, Daehee; Yoo, Keun-Young; Park, Sue K

    2013-01-01

    We evaluated the performance of the Gail model for a Korean population and developed a Korean breast cancer risk assessment tool (KoBCRAT) based upon equations developed for the Gail model for predicting breast cancer risk. Using 3,789 sets of cases and controls, risk factors for breast cancer among Koreans were identified. Individual probabilities were projected using Gail's equations and Korean hazard data. We compared the 5-year and lifetime risk produced using the modified Gail model which applied Korean incidence and mortality data and the parameter estimators from the original Gail model with those produced using the KoBCRAT. We validated the KoBCRAT based on the expected/observed breast cancer incidence and area under the curve (AUC) using two Korean cohorts: the Korean Multicenter Cancer Cohort (KMCC) and National Cancer Center (NCC) cohort. The major risk factors under the age of 50 were family history, age at menarche, age at first full-term pregnancy, menopausal status, breastfeeding duration, oral contraceptive usage, and exercise, while those at and over the age of 50 were family history, age at menarche, age at menopause, pregnancy experience, body mass index, oral contraceptive usage, and exercise. The modified Gail model produced lower 5-year risk for the cases than for the controls (p = 0.017), while the KoBCRAT produced higher 5-year and lifetime risk for the cases than for the controls (pKorean women, especially urban women.

  8. Risk assessment tools to identify women with increased risk of osteoporotic fracture. Complexity or simplicity?

    DEFF Research Database (Denmark)

    Rubin, Katrine Hass; Friis-Holmberg, Teresa; Hermann, Anne Pernille

    2013-01-01

    A huge number of risk assessment tools have been developed. Far from all have been validated in external studies, more of them have absence of methodological and transparent evidence and few are integrated in national guidelines. Therefore, we performed a systematic review to provide an overview...... of existing valid and reliable risk assessment tools for prediction of osteoporotic fractures. Additionally, we aimed to determine if the performance each tool was sufficient for practical use and lastly to examine whether the complexity of the tools influenced their discriminative power. We searched Pub......Med, Embase and Cochrane databases for papers and evaluated these with respect to methodological quality using the QUADAS checklist. A total of 48 tools were identified, 20 had been externally validated, however only 6 tools had been tested more than once in a population-based setting with acceptable...

  9. Waste area Grouping 2 Phase I task data report: Human health risk assessment

    International Nuclear Information System (INIS)

    Purucker, S.T.; Douthat, D.M.

    1996-06-01

    This report is one of five reports issued in 1996 that provide follow- up information to the Phase 1 Remedial Investigation (RI) Report for Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL). The five reports address areas of concern that could cause potential human health risk and ecological risk within WAG2 at ORNL. The purpose of this report is to present a summary of the human health risk assessment results based on the data collected for the WAG 2 Phase 1 RI. Estimates of risk are provided based on measured concentrations in the surface water, floodplain soil, and sediment of White Oak Creek, Melton Branch, and their tributaries. The human health risk assessment methodology used in this risk assessment is based on Risk Assessment Guidance for Superfund (RAGS). First, the data for the different media are elevated to determine usability for risk assessment. Second, through the process of selecting chemicals of potential concern (COPCs), contaminants to be considered in the risk assessment are identified for each assessment of exposure potential is performed, and exposure pathways are identified. Subsequently, exposure is estimated quantitatively, and the toxicity of each of the COPCs is determined. The results of these analyses are combined and summarized in a risk characterization

  10. Risk assessment guidance document for the UMTRA project groundwater remediation phase

    International Nuclear Information System (INIS)

    1992-05-01

    The purpose of the groundwater remedial activities at the Uranium Mill Tailings Remedial Action (UMTRA) sites is to reduce, control, or eliminate risks to human health and the environment. This is in accordance with Subpart B of 40 CFR 192. According to this regulation, the need for groundwater restoration is based upon US Environmental Protection Agency (EPA)-defined groundwater cleanup standards and must be consistent with the National Environmental Policy Act (NEPA) process. Risk assessments will be used in the UMTRA Groundwater Program to aid in the evaluation of sites. Risk assessments are conducted for four purposes: (1) Preliminary risk assessments are used to aid in prioritizing sites, scope data collection, end determine if a site presents immediate health risks. (2) Baseline risk assessments provide a comprehensive integration and interpretation of demographic, geographic, physical, chemical, and biological factors at a site to determine the extent of actual or potential harm. This information Is used to determine the need for remedial action. (3) Risk evaluation of remedial alternatives is performed to evaluate risks to humans or the environment associated with the various remedial strategies. (4) After remediation, an evaluation of residual risks is conducted. The information gathered for each of these risk evaluations is used to determine the need for subsequent evaluation. Several sites may be eliminated after a preliminary risk assessment if there is no current or future threat to humans or the environment. Likewise, much of the data from a baseline risk assessment can be used to support alternate concentration limits or supplemental standards demonstrations, or identify sensitive habitats or receptors that may be of concern in selecting a remedy

  11. Using toxicokinetic-toxicodynamic modeling as an acute risk assessment refinement approach in vertebrate ecological risk assessment.

    Science.gov (United States)

    Ducrot, Virginie; Ashauer, Roman; Bednarska, Agnieszka J; Hinarejos, Silvia; Thorbek, Pernille; Weyman, Gabriel

    2016-01-01

    Recent guidance identified toxicokinetic-toxicodynamic (TK-TD) modeling as a relevant approach for risk assessment refinement. Yet, its added value compared to other refinement options is not detailed, and how to conduct the modeling appropriately is not explained. This case study addresses these issues through 2 examples of individual-level risk assessment for 2 hypothetical plant protection products: 1) evaluating the risk for small granivorous birds and small omnivorous mammals of a single application, as a seed treatment in winter cereals, and 2) evaluating the risk for fish after a pulsed treatment in the edge-of-field zone. Using acute test data, we conducted the first tier risk assessment as defined in the European Food Safety Authority (EFSA) guidance. When first tier risk assessment highlighted a concern, refinement options were discussed. Cases where the use of models should be preferred over other existing refinement approaches were highlighted. We then practically conducted the risk assessment refinement by using 2 different models as examples. In example 1, a TK model accounting for toxicokinetics and relevant feeding patterns in the skylark and in the wood mouse was used to predict internal doses of the hypothetical active ingredient in individuals, based on relevant feeding patterns in an in-crop situation, and identify the residue levels leading to mortality. In example 2, a TK-TD model accounting for toxicokinetics, toxicodynamics, and relevant exposure patterns in the fathead minnow was used to predict the time-course of fish survival for relevant FOCUS SW exposure scenarios and identify which scenarios might lead to mortality. Models were calibrated using available standard data and implemented to simulate the time-course of internal dose of active ingredient or survival for different exposure scenarios. Simulation results were discussed and used to derive the risk assessment refinement endpoints used for decision. Finally, we compared the

  12. Analysis of risk assessment methods for goods trucking

    Directory of Open Access Journals (Sweden)

    Yunyazova A.O.

    2018-04-01

    Full Text Available the article considers models of risk assessment that can be applied to cargo transportation, for forecasting possible damage in the form of financial and material costs in order to reduce the percentage of probability of their occurrence. The analysis of risk by the method «Criterion. Event. Rule" is represented. This method is based on the collection of information by various methods, assigning an assessment to the identified risks, ranking and formulating a report on the analysis. It can be carried out as a fully manual mechanical method of information collecting and performing calculations or can be brought to an automated level from data collection to the delivery of finished results (but in this case some nuances that could significantly influence the outcome of the analysis can be ignored. The expert method is of particular importance, since it relies directly on human experience. In this case, a special role is played by the human factor. The collection of information and the assigned assessments to risk groups depend on the extent to which experts agree on this issue. The smaller the fluctuations in the values ​​of the estimates of the experts, the more accurate and optimal the results will be.

  13. Approaches to cancer assessment in EPA's Integrated Risk Information System.

    Science.gov (United States)

    Gehlhaus, Martin W; Gift, Jeffrey S; Hogan, Karen A; Kopylev, Leonid; Schlosser, Paul M; Kadry, Abdel-Razak

    2011-07-15

    The U.S. Environmental Protection Agency's (EPA) Integrated Risk Information System (IRIS) Program develops assessments of health effects that may result from chronic exposure to chemicals in the environment. The IRIS database contains more than 540 assessments. When supported by available data, IRIS assessments provide quantitative analyses of carcinogenic effects. Since publication of EPA's 2005 Guidelines for Carcinogen Risk Assessment, IRIS cancer assessments have implemented new approaches recommended in these guidelines and expanded the use of complex scientific methods to perform quantitative dose-response assessments. Two case studies of the application of the mode of action framework from the 2005 Cancer Guidelines are presented in this paper. The first is a case study of 1,2,3-trichloropropane, as an example of a chemical with a mutagenic mode of carcinogenic action thus warranting the application of age-dependent adjustment factors for early-life exposure; the second is a case study of ethylene glycol monobutyl ether, as an example of a chemical with a carcinogenic action consistent with a nonlinear extrapolation approach. The use of physiologically based pharmacokinetic (PBPK) modeling to quantify interindividual variability and account for human parameter uncertainty as part of a quantitative cancer assessment is illustrated using a case study involving probabilistic PBPK modeling for dichloromethane. We also discuss statistical issues in assessing trends and model fit for tumor dose-response data, analysis of the combined risk from multiple types of tumors, and application of life-table methods for using human data to derive cancer risk estimates. These issues reflect the complexity and challenges faced in assessing the carcinogenic risks from exposure to environmental chemicals, and provide a view of the current trends in IRIS carcinogenicity risk assessment. Copyright © 2011. Published by Elsevier Inc.

  14. Approaches to cancer assessment in EPA's Integrated Risk Information System

    International Nuclear Information System (INIS)

    Gehlhaus, Martin W.; Gift, Jeffrey S.; Hogan, Karen A.; Kopylev, Leonid; Schlosser, Paul M.; Kadry, Abdel-Razak

    2011-01-01

    The U.S. Environmental Protection Agency's (EPA) Integrated Risk Information System (IRIS) Program develops assessments of health effects that may result from chronic exposure to chemicals in the environment. The IRIS database contains more than 540 assessments. When supported by available data, IRIS assessments provide quantitative analyses of carcinogenic effects. Since publication of EPA's 2005 Guidelines for Carcinogen Risk Assessment, IRIS cancer assessments have implemented new approaches recommended in these guidelines and expanded the use of complex scientific methods to perform quantitative dose-response assessments. Two case studies of the application of the mode of action framework from the 2005 Cancer Guidelines are presented in this paper. The first is a case study of 1,2,3-trichloropropane, as an example of a chemical with a mutagenic mode of carcinogenic action thus warranting the application of age-dependent adjustment factors for early-life exposure; the second is a case study of ethylene glycol monobutyl ether, as an example of a chemical with a carcinogenic action consistent with a nonlinear extrapolation approach. The use of physiologically based pharmacokinetic (PBPK) modeling to quantify interindividual variability and account for human parameter uncertainty as part of a quantitative cancer assessment is illustrated using a case study involving probabilistic PBPK modeling for dichloromethane. We also discuss statistical issues in assessing trends and model fit for tumor dose-response data, analysis of the combined risk from multiple types of tumors, and application of life-table methods for using human data to derive cancer risk estimates. These issues reflect the complexity and challenges faced in assessing the carcinogenic risks from exposure to environmental chemicals, and provide a view of the current trends in IRIS carcinogenicity risk assessment.

  15. Cardiovascular risk assessment in type 2 diabetes mellitus: comparison of the World Health Organization/International Society of Hypertension risk prediction charts versus UK Prospective Diabetes Study risk engine.

    Science.gov (United States)

    Herath, Herath M Meththananda; Weerarathna, Thilak Priyantha; Umesha, Dilini

    2015-01-01

    Patients with type 2 diabetes mellitus (T2DM) are at higher risk of developing cardiovascular diseases, and assessment of their cardiac risk is important for preventive strategies. The Ministry of Health of Sri Lanka has recommended World Health Organization/International Society of Hypertension (WHO/ISH) charts for cardiac risk assessment in individuals with T2DM. However, the most suitable cardiac risk assessment tool for Sri Lankans with T2DM has not been studied. This study was designed to evaluate the performance of two cardiac risk assessments tools; WHO/ISH charts and UK Prospective Diabetes Study (UKPDS) risk engine. Cardiac risk assessments were done in 2,432 patients with T2DM attending a diabetes clinic in Southern Sri Lanka using the two risk assessment tools. Validity of two assessment tools was further assessed by their ability to recognize individuals with raised low-density lipoprotein (LDL) and raised diastolic blood pressure in a cohort of newly diagnosed T2DM patients (n=332). WHO/ISH charts identified 78.4% of subjects as low cardiac risk whereas the UKPDS risk engine categorized 52.3% as low cardiac risk (Pengine identified higher proportions of patients (28%) compared to WHO/ISH charts (7%). Approximately 6% of subjects were classified as low cardiac risk (20%. Agreement between the two tools was poor (κ value =0.144, Pengine. Risk assessment by both assessment tools demonstrated poor sensitivity in identifying those with treatable levels of LDL cholesterol and diastolic blood pressure.

  16. RELEVANCE OF PROCESS RISK ASSESSMENT IN AIRLINES

    Directory of Open Access Journals (Sweden)

    Oksana G. Feoktistova

    2017-01-01

    Full Text Available The notion of “the concept on assumed risk” that took over from the outdated concept of absolute security is analyzed, the increasing significance of operating risk assessment at the present stage is noted. Some basic risk assessment techniques are considered. Matrix technique of risk assessment is considered more thoroughly, and it may be used in risk assessment of airlines in the context of labour protection management system.The ability to correctly assess risks and develop appropriate precautionary measures will allow airlines to avoid incidents leading to drastic consequences for staff, as well as to direct and indirect costs for the enterprise among which there could be singled out both direct property damage and loss of profit and expenses connected to incident investigation, penalty and compensation payment, loss of business reputation and so on. To reduce the rate of accidents and to develop safe activities skills for airlines staff a risk assessment chart is supposed to be implemented, which will be an efficient accidents prevention involving the staff in the process and making them follow safe working conditions.Process risk assessment is an integral part of assessment of the whole enterprise activity and work efficiency of a department and particular workers evaluation system. Labour protection activity should be based on risk identification and its control. Risk assessment is a keystone of labour protection activity planning.

  17. Risk Assessment in Underground Coalmines Using Fuzzy Logic in the Presence of Uncertainty

    Science.gov (United States)

    Tripathy, Debi Prasad; Ala, Charan Kumar

    2018-04-01

    Fatal accidents are occurring every year as regular events in Indian coal mining industry. To increase the safety conditions, it has become a prerequisite to performing a risk assessment of various operations in mines. However, due to uncertain accident data, it is hard to conduct a risk assessment in mines. The object of this study is to present a method to assess safety risks in underground coalmines. The assessment of safety risks is based on the fuzzy reasoning approach. Mamdani fuzzy logic model is developed in the fuzzy logic toolbox of MATLAB. A case study is used to demonstrate the applicability of the developed model. The summary of risk evaluation in case study mine indicated that mine fire has the highest risk level among all the hazard factors. This study could help the mine management to prepare safety measures based on the risk rankings obtained.

  18. Assessing the risk of recurrent venous thromboembolism – a practical approach

    Science.gov (United States)

    Fahrni, Jennifer; Husmann, Marc; Gretener, Silvia B; Keo, Hong H

    2015-01-01

    Recurrent venous thromboembolism (VTE) is associated with increased morbidity and mortality. This risk is lowered by anticoagulation, with a large effect in the initial phase following the venous thromboembolic event, and with a smaller effect in terms of secondary prevention of recurrence when extended anticoagulation is performed. On the other hand, extended anticoagulation is associated with an increased risk of major bleeding and thus leads to morbidity and mortality. Therefore, it is necessary to assess the risk of recurrence for VTE on an individual basis, and a recommendation for secondary prophylaxis should be specifically based on risk calculation of recurrence of VTE and bleeding. In this review, we provide a comprehensive summary of relevant risk factors for recurrent VTE and a practical approach for assessing the risk of recurrence in daily practice. PMID:26316770

  19. Developing a caries risk registry to support caries risk assessment and management for children: A quality improvement initiative.

    Science.gov (United States)

    Ruff, Jesley C; Herndon, Jill Boylston; Horton, Roger A; Lynch, Julie; Mathwig, Dawn C; Leonard, Audra; Aravamudhan, Krishna

    2017-10-27

    Health registries are commonly used in medicine to support public health activities and are increasingly used in quality improvement (QI) initiatives. Illustrations of dental registries and their QI applications are lacking. Within dentistry, caries risk assessment implementation and documentation are vital to optimal patient care. The purpose of this article is to describe the processes used to develop a caries risk assessment registry as a QI initiative to support clinical caries risk assessment, caries prevention, and disease management for children. Developmental steps reflected Agency for Healthcare Research and Quality recommendations for planning QI registries and included engaging "champions," defining the project, identifying registry features, defining performance dashboard indicators, and pilot testing with participant feedback. We followed Standards for Quality Improvement Reporting Excellence guidelines. Registry eligibility is patients aged 0-17 years. QI tools include prompts to register eligible patients; decision support tools grounded in evidence-based guidelines; and performance dashboard reports delivered at the provider and aggregated levels at regular intervals. The registry was successfully piloted in two practices with documented caries risk assessment increasing from 57 percent to 92 percent and positive feedback regarding the potential to improve dental practice patient centeredness, patient engagement and education, and quality of care. The caries risk assessment registry demonstrates how dental registries may be used in QI efforts to promote joint patient and provider engagement, foster shared decision making, and systematically collect patient information to generate timely and actionable data to improve care quality and patient outcomes at the individual and population levels. © 2017 American Association of Public Health Dentistry.

  20. Risk assessment in infrastructure in educational institution: A study in Malaysia

    Science.gov (United States)

    Rasdan Ismail, Ahmad; Adilah Hamzah, Noor; Kamilah Makhtar, Nor; Azhar Mat Daud, Khairul; Zulkarnaen Khidzir, Nik; Husna Che Hassan, Nurul; Arifpin Mansor, Muhamad

    2017-10-01

    This particular study was conducted to assess the hazard exposure in education institution and to highlight the possible risk level available. The assessment utilised is Hazard Identification, Risk Assessment and Risk Control (HIRARC). There was a 2008’s form in order to determine the risk level of the hazard. There were over 111 of education institutions were selected around Malaysia to perform this assessment. Area chosen for each institution was office, playing field, canteen, classroom, toilet and drainage. By referring HIRARC Guideline 2008, the determination of risk rank is measure based on the formula likelihood multiply severity and the rank need to refer from risk matrix standard. There are several hazard have be found and shows the high, medium and low of risk level. The higher level of risk was discussed in the study which is hazard found in playing field and hazard in office. There several hazard that need to be control by education management to avoid increase of case accident in Education Sector, Malaysia. As conclusion, the exposure hazard among the staff and educators is high and further action and control are needed. Further study need to explore the best recommendation for control measure of the hazard exposed by education institution.

  1. Presentation of a Software Method for Use of Risk Assessment in Building Fire Safety Measure Optimization

    Directory of Open Access Journals (Sweden)

    A. R. Koohpaei

    2012-05-01

    Full Text Available Background and aims: The property loss and physical injuries due to fire events in buildings demonstrate the necessity of implementation of efficient and performance based fire safety measures. Effective and high efficiency protection is possible when design and selection of protection measures are based on risk assessment. This study aims at presenting a software method to make possible selection and design of building fire safety measures based upon quantitative risk assessment and building characteristics. Methods: based on “Fire Risk Assessment Method for Engineer (FRAME” a program in MATLB software was written. The first section of this program, according to the FRAME method and based on the specification of a building, calculates the potential risk and acceptable risk level. In the second section, according to potential risk, acceptable risk level and the fire risk level that user want, program calculate concession of protective factor for that building.Results: The prepared software make it possible to assign the fire safety measure based on quantitative risk level and all building specifications. All calculations were performed with 0.001 of precision and the accuracy of this software was assessed with handmade calculations. During the use of the software if an error occurs in calculations, it can be distinguished in the output. Conclusion: Application of quantitative risk assessment is a suitable tool for increasing of efficiency in designing and execution of fire protection measure in building. With using this software the selected fire safety measure would be more efficient and suitable since the selection of fire safety measures performed on risk assessment and particular specification of a building. Moreover fire risk in the building can be managed easily and carefully.

  2. Uncertainty quantification in flood risk assessment

    Science.gov (United States)

    Blöschl, Günter; Hall, Julia; Kiss, Andrea; Parajka, Juraj; Perdigão, Rui A. P.; Rogger, Magdalena; Salinas, José Luis; Viglione, Alberto

    2017-04-01

    Uncertainty is inherent to flood risk assessments because of the complexity of the human-water system, which is characterised by nonlinearities and interdependencies, because of limited knowledge about system properties and because of cognitive biases in human perception and decision-making. On top of the uncertainty associated with the assessment of the existing risk to extreme events, additional uncertainty arises because of temporal changes in the system due to climate change, modifications of the environment, population growth and the associated increase in assets. Novel risk assessment concepts are needed that take into account all these sources of uncertainty. They should be based on the understanding of how flood extremes are generated and how they change over time. They should also account for the dynamics of risk perception of decision makers and population in the floodplains. In this talk we discuss these novel risk assessment concepts through examples from Flood Frequency Hydrology, Socio-Hydrology and Predictions Under Change. We believe that uncertainty quantification in flood risk assessment should lead to a robust approach of integrated flood risk management aiming at enhancing resilience rather than searching for optimal defense strategies.

  3. Produced water radionuclide hazard/risk assessment, Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Nagy, J.

    1991-06-01

    Petroleum production may be accompanied by the production of saline water, called produced water.'' Produced water discharged into freshwater streams, estuaries, coastal and outer continental shelf waters can contained enhanced levels of radium isotopes. This document reports on the first phase of a study to estimate the risk to human health and the environment from radium discharged in produced water. The study involved five major steps: (1) evaluate the usefulness of available produced water outfall data for developing estimates of radium environmental concentrations; (2) review the literature on the bioaccumulation of radium by aquatic organism; (3) review the literature on the effects of radiation on aquatic organisms; (4) review the information available concerning the human health risks associated with exposure to Ra-226 and Ra-228 and (5) perform a conservative, screening-level assessment of the health and environmental risks posed by Ra-226 and Ra-228 discharged in produced waters. A screening-level analysis was performed to determine whether radium discharged to coastal Louisiana in produced waters presents potential health or environmental risks requiring further study. This conservative assessment suggested that no detectable impact on populations of fish, molluscs or crustaceans from radium discharged in produced waters is likely. The analysis also suggested that there is a potential for risk were an individual to ingest a large amount of seafood harvested near a produced water discharge point over a lifetime. The number of excess cancers predicted per year under a conservative scenario is comparable to those expected to result from background concentrations of radium.

  4. Produced water radionuclide hazard/risk assessment, Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Nagy, J.

    1991-06-01

    Petroleum production may be accompanied by the production of saline water, called ``produced water.`` Produced water discharged into freshwater streams, estuaries, coastal and outer continental shelf waters can contained enhanced levels of radium isotopes. This document reports on the first phase of a study to estimate the risk to human health and the environment from radium discharged in produced water. The study involved five major steps: (1) evaluate the usefulness of available produced water outfall data for developing estimates of radium environmental concentrations; (2) review the literature on the bioaccumulation of radium by aquatic organism; (3) review the literature on the effects of radiation on aquatic organisms; (4) review the information available concerning the human health risks associated with exposure to Ra-226 and Ra-228 and (5) perform a conservative, screening-level assessment of the health and environmental risks posed by Ra-226 and Ra-228 discharged in produced waters. A screening-level analysis was performed to determine whether radium discharged to coastal Louisiana in produced waters presents potential health or environmental risks requiring further study. This conservative assessment suggested that no detectable impact on populations of fish, molluscs or crustaceans from radium discharged in produced waters is likely. The analysis also suggested that there is a potential for risk were an individual to ingest a large amount of seafood harvested near a produced water discharge point over a lifetime. The number of excess cancers predicted per year under a conservative scenario is comparable to those expected to result from background concentrations of radium.

  5. Produced water radionuclide hazard/risk assessment, Phase 1

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Meinhold, A.F.; Nagy, J.

    1991-06-01

    Petroleum production may be accompanied by the production of saline water, called ''produced water.'' Produced water discharged into freshwater streams, estuaries, coastal and outer continental shelf waters can contained enhanced levels of radium isotopes. This document reports on the first phase of a study to estimate the risk to human health and the environment from radium discharged in produced water. The study involved five major steps: (1) evaluate the usefulness of available produced water outfall data for developing estimates of radium environmental concentrations; (2) review the literature on the bioaccumulation of radium by aquatic organism; (3) review the literature on the effects of radiation on aquatic organisms; (4) review the information available concerning the human health risks associated with exposure to Ra-226 and Ra-228 and (5) perform a conservative, screening-level assessment of the health and environmental risks posed by Ra-226 and Ra-228 discharged in produced waters. A screening-level analysis was performed to determine whether radium discharged to coastal Louisiana in produced waters presents potential health or environmental risks requiring further study. This conservative assessment suggested that no detectable impact on populations of fish, molluscs or crustaceans from radium discharged in produced waters is likely. The analysis also suggested that there is a potential for risk were an individual to ingest a large amount of seafood harvested near a produced water discharge point over a lifetime. The number of excess cancers predicted per year under a conservative scenario is comparable to those expected to result from background concentrations of radium

  6. Risk assessment for produced water discharges to Louisiana open bays. Final report

    International Nuclear Information System (INIS)

    Meinhold, A.F.; DePhillips, M.P.; Holtzman, S.

    1996-01-01

    The US Department of Energy (USDOE) has a program of research in the environmental aspects of oil and gas extraction. This sampling project will characterize the environmental impacts associated with the discharge of naturally occurring radioactive materials (NORM), metals and organics in produced water. This report is part of a series of studies of the health and ecological risks from discharges of produced water to the Gulf of Mexico, supported by the USDOE. These assessments are being coordinated with the field study, using the collected data to perform human health and ecological risk assessments. These assessments will provide input to regulators in the development of guidelines and permits, and to industry in the development and use of appropriate discharge practices. The initial human health and ecological risk assessments consist of conservative screening analyses meant to identify potentially important contaminants, and to eliminate others from further consideration. More quantitative assessments were done for contaminants identified, in the screening analysis, as being of potential concern. Section 2 gives an overview of human health and ecological risk assessment to help put the analyses presented here in perspective. Section 3 provides the hazard assessment portion of the risk assessment, and identifies the important receptors and pathways of concern. Section 3 also outlines the approach taken to the risk assessments presented in the rest of the report. The remaining sections (4 through 9) present the human health and ecological risk assessments for discharges of produced water to open bays in Louisiana

  7. A framework for assessing ecological risks of petroleum-derived materials in soil

    International Nuclear Information System (INIS)

    Suter, G.W. II

    1997-05-01

    Ecological risk assessment estimates the nature and likelihood of effects of human actions on nonhuman organisms, populations, and ecosystems. It is intended to be clearer and more rigorous in its approach to estimation of effects and uncertainties than previously employed methods of ecological assessment. Ecological risk assessment is characterized by a standard paradigm that includes problem formulation, analysis of exposure and effects, risk characterization, and communication with a risk manager. This report provides a framework that applies the paradigm to the specific problem of assessing the ecological risks of petroleum in soil. This type of approach requires that assessments be performed in phases: (1) a scoping assessment to determine whether there is a potential route of exposure for potentially significant ecological receptors; (2) a screening assessment to determine whether exposures could potentially reach toxic levels; and (3) a definitive assessment to estimate the nature, magnitude, and extent of risks. The principal technical issue addressed is the chemically complex nature of petroleum--a complexity that may be dealt with by assessing risks on the basis of properties of the whole material, properties of individual chemicals that are representative of chemical classes, distributions of properties of the constituents of chemical classes, properties of chemicals detected in the soil, and properties of indicator chemicals. The advantages and feasibility of these alternatives are discussed. The report concludes with research recommendations for improving each stage in the assessment process

  8. Reevaluating Interrater Reliability in Offender Risk Assessment

    Science.gov (United States)

    van der Knaap, Leontien M.; Leenarts, Laura E. W.; Born, Marise Ph.; Oosterveld, Paul

    2012-01-01

    Offender risk and needs assessment, one of the pillars of the risk-need-responsivity model of offender rehabilitation, usually depends on raters assessing offender risk and needs. The few available studies of interrater reliability in offender risk assessment are, however, limited in the generalizability of their results. The present study…

  9. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  10. Transportation System Risk Assessment on DOE Defense Program shipments

    International Nuclear Information System (INIS)

    Brumburgh, G.P.; Kimura, C.Y.; Alesso, H.P.; Prassinos, P.G.

    1992-01-01

    Substantial effort has been expended concerning the level of safety provided to persons, property, and the environment from the hazards associated with transporting radioactive material. This work provided an impetus for the Department of Energy to investigate the use of probabilistic risk assessment techniques to supplement the deterministic approach to transportation safety. The DOE recently decided to incorporate the methodologies associated with PRAs in the process for authorizing the transportation of nuclear components, special assemblies, and radioactive materials affiliated with the DOE Defense Program. Accordingly, the LLNL, sponsored by the DOE/AL, is tasked with developing a safety guide series to provide guidance to preparers performing a transportation system risk assessment

  11. Enhancing the ecological risk assessment process.

    Science.gov (United States)

    Dale, Virginia H; Biddinger, Gregory R; Newman, Michael C; Oris, James T; Suter, Glenn W; Thompson, Timothy; Armitage, Thomas M; Meyer, Judith L; Allen-King, Richelle M; Burton, G Allen; Chapman, Peter M; Conquest, Loveday L; Fernandez, Ivan J; Landis, Wayne G; Master, Lawrence L; Mitsch, William J; Mueller, Thomas C; Rabeni, Charles F; Rodewald, Amanda D; Sanders, James G; van Heerden, Ivor L

    2008-07-01

    The Ecological Processes and Effects Committee of the US Environmental Protection Agency Science Advisory Board conducted a self-initiated study and convened a public workshop to characterize the state of the ecological risk assessment (ERA), with a view toward advancing the science and application of the process. That survey and analysis of ERA in decision making shows that such assessments have been most effective when clear management goals were included in the problem formulation; translated into information needs; and developed in collaboration with decision makers, assessors, scientists, and stakeholders. This process is best facilitated when risk managers, risk assessors, and stakeholders are engaged in an ongoing dialogue about problem formulation. Identification and acknowledgment of uncertainties that have the potential to profoundly affect the results and outcome of risk assessments also improves assessment effectiveness. Thus we suggest 1) through peer review of ERAs be conducted at the problem formulation stage and 2) the predictive power of risk-based decision making be expanded to reduce uncertainties through analytical and methodological approaches like life cycle analysis. Risk assessment and monitoring programs need better integration to reduce uncertainty and to evaluate risk management decision outcomes. Postdecision audit programs should be initiated to evaluate the environmental outcomes of risk-based decisions. In addition, a process should be developed to demonstrate how monitoring data can be used to reduce uncertainties. Ecological risk assessments should include the effects of chemical and nonchemical stressors at multiple levels of biological organization and spatial scale, and the extent and resolution of the pertinent scales and levels of organization should be explicitly considered during problem formulation. An approach to interpreting lines of evidence and weight of evidence is critically needed for complex assessments, and it would

  12. Likelihood ratio-based integrated personal risk assessment of type 2 diabetes.

    Science.gov (United States)

    Sato, Noriko; Htun, Nay Chi; Daimon, Makoto; Tamiya, Gen; Kato, Takeo; Kubota, Isao; Ueno, Yoshiyuki; Yamashita, Hidetoshi; Fukao, Akira; Kayama, Takamasa; Muramatsu, Masaaki

    2014-01-01

    To facilitate personalized health care for multifactorial diseases, risks of genetic and clinical/environmental factors should be assessed together for each individual in an integrated fashion. This approach is possible with the likelihood ratio (LR)-based risk assessment system, as this system can incorporate manifold tests. We examined the usefulness of this system for assessing type 2 diabetes (T2D). Our system employed 29 genetic susceptibility variants, body mass index (BMI), and hypertension as risk factors whose LRs can be estimated from openly available T2D association data for the Japanese population. The pretest probability was set at a sex- and age-appropriate population average of diabetes prevalence. The classification performance of our LR-based risk assessment was compared to that of a non-invasive screening test for diabetes called TOPICS (with score based on age, sex, family history, smoking, BMI, and hypertension) using receiver operating characteristic analysis with a community cohort (n = 1263). The area under the receiver operating characteristic curve (AUC) for the LR-based assessment and TOPICS was 0.707 (95% CI 0.665-0.750) and 0.719 (0.675-0.762), respectively. These AUCs were much higher than that of a genetic risk score constructed using the same genetic susceptibility variants, 0.624 (0.574-0.674). The use of ethnically matched LRs is necessary for proper personal risk assessment. In conclusion, although LR-based integrated risk assessment for T2D still requires additional tests that evaluate other factors, such as risks involved in missing heritability, our results indicate the potential usability of LR-based assessment system and stress the importance of stratified epidemiological investigations in personalized medicine.

  13. Risk assessment of transitional economies by multivariate and multicriteria approaches

    Directory of Open Access Journals (Sweden)

    Tomić-Plazibat Neli

    2010-01-01

    Full Text Available This article assesses country-risk of sixteen Central, Baltic and South-East European transition countries, for 2005 and 2007, using multivariate cluster analysis. It was aided by the appropriate ANOVA (analysis of variance testing and the multicriteria PROMETHEE method. The combination of methods makes for more accurate and efficient country-risk assessment. Country risk classifications and ratings involve evaluating the performance of countries while considering their economic and socio-political characteristics. The purpose of the article is to classify, and then find the comparative position of each individual country in the group of analyzed countries, in order to find out to which extent development of market economy and democratic society has been achieved.

  14. Approach and strategy for performing ecological risk assessments for the Department of Energy Oak Ridge Field Office Environmental Restoration Program

    International Nuclear Information System (INIS)

    Suter, G.W. II; Redfearn, A.; White, R.K.; Shaw, R.A.

    1992-07-01

    This document is intended to supplement exiting US Environmental Protection Agency (EPA) guidance for ecological risk assessment at hazardous waste sites by providing guidance that is more specific and more tailored to US Department of Energy sites than the guidance available from the EPA. However, it is a conceptual strategy document and does not include specific guidance on data, assumptions, and models. That detailed guidance is under development and will be presented in subsequent documents. Ecological risk assessments are equal to human health risk assessments in regulatory importance and can use many of the same data and some of the same estimation methods. However, they also have peculiar data needs and methods. Ecological risk assessments begin with an initial scoping phase, termed hazard definition, that characterizes the sources, the potentially environment, and the assessment endpoints. In the subsequent measurement and estimation phase, in which data are obtained concerning source of the endpoint biota to the contaminants and the effects of those exposures, and assumptions and models are used to relate the data to the desired exposure and effects parameters. Finally, in an integration phase, termed risk characterization, the various exposure and effects estimates are combined to infer the existence, cause, magnitude, and extent of effects of contaminants on the ecological endpoints. This phase is much more complicated for ecological risk assessments than for human health assessments because more types of data are available. Ecological risk assessments estimate effects using laboratory toxicity test results, like human health assessments, but also use results of ambient toxicity tests and biological surveys

  15. Affordable, automatic quantitative fall risk assessment based on clinical balance scales and Kinect data.

    Science.gov (United States)

    Colagiorgio, P; Romano, F; Sardi, F; Moraschini, M; Sozzi, A; Bejor, M; Ricevuti, G; Buizza, A; Ramat, S

    2014-01-01

    The problem of a correct fall risk assessment is becoming more and more critical with the ageing of the population. In spite of the available approaches allowing a quantitative analysis of the human movement control system's performance, the clinical assessment and diagnostic approach to fall risk assessment still relies mostly on non-quantitative exams, such as clinical scales. This work documents our current effort to develop a novel method to assess balance control abilities through a system implementing an automatic evaluation of exercises drawn from balance assessment scales. Our aim is to overcome the classical limits characterizing these scales i.e. limited granularity and inter-/intra-examiner reliability, to obtain objective scores and more detailed information allowing to predict fall risk. We used Microsoft Kinect to record subjects' movements while performing challenging exercises drawn from clinical balance scales. We then computed a set of parameters quantifying the execution of the exercises and fed them to a supervised classifier to perform a classification based on the clinical score. We obtained a good accuracy (~82%) and especially a high sensitivity (~83%).

  16. Risk factors and assessment for cardiovascular disease among HIV ...

    African Journals Online (AJOL)

    Methods: this was a cross-sectional study of HIV-positive patients attending the Lagos University Teaching Hospital, Nigeria. Anthropometric and blood pressure measurements were performed; fasting lipid profile, plasma glucose, homocysteine and hsCRP were determined, as well as prevalences and risk assessments.

  17. Risk assessment in the DOE Assurance Program for Remedial Action

    International Nuclear Information System (INIS)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly

  18. An approach for integrating toxicogenomic data in risk assessment: The dibutyl phthalate case study

    Energy Technology Data Exchange (ETDEWEB)

    Euling, Susan Y., E-mail: euling.susan@epa.gov [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, Washington, DC (United States); Thompson, Chad M. [ToxStrategies, Inc., 23501 Cinco Ranch Blvd., Suite G265, Katy, TX 77494 (United States); Chiu, Weihsueh A. [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, Washington, DC (United States); Benson, Robert [U.S. Environmental Protection Agency, Region 8, Mail code 8P-W, 1595 Wynkoop Street, Denver, CO 80202 (United States)

    2013-09-15

    An approach for evaluating and integrating genomic data in chemical risk assessment was developed based on the lessons learned from performing a case study for the chemical dibutyl phthalate. A case study prototype approach was first developed in accordance with EPA guidance and recommendations of the scientific community. Dibutyl phthalate (DBP) was selected for the case study exercise. The scoping phase of the dibutyl phthalate case study was conducted by considering the available DBP genomic data, taken together with the entire data set, for whether they could inform various risk assessment aspects, such as toxicodynamics, toxicokinetics, and dose–response. A description of weighing the available dibutyl phthalate data set for utility in risk assessment provides an example for considering genomic data for future chemical assessments. As a result of conducting the scoping process, two questions—Do the DBP toxicogenomic data inform 1) the mechanisms or modes of action?, and 2) the interspecies differences in toxicodynamics?—were selected to focus the case study exercise. Principles of the general approach include considering the genomics data in conjunction with all other data to determine their ability to inform the various qualitative and/or quantitative aspects of risk assessment, and evaluating the relationship between the available genomic and toxicity outcome data with respect to study comparability and phenotypic anchoring. Based on experience from the DBP case study, recommendations and a general approach for integrating genomic data in chemical assessment were developed to advance the broader effort to utilize 21st century data in risk assessment. - Highlights: • Performed DBP case study for integrating genomic data in risk assessment • Present approach for considering genomic data in chemical risk assessment • Present recommendations for use of genomic data in chemical risk assessment.

  19. Waste area grouping 2 Phase I task data report: Ecological risk assessment and White Oak Creek watershed screening ecological risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Efroymson, R.A.; Jackson, B.L.; Jones, D.S. [and others

    1996-05-01

    This report presents an ecological risk assessment for Waste Area Grouping (WAG) 2 based on the data collected in the Phase I remedial investigation (RI). It serves as an update to the WAG 2 screening ecological risk assessment that was performed using historic data. In addition to identifying potential ecological risks in WAG 2 that may require additional data collection, this report serves to determine whether there are ecological risks of sufficient magnitude to require a removal action or some other expedited remedial process. WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the Oak Ridge National Laboratory (ORNL) main plant area, White Oak Lake (WOL), the White Oak Creek Embayment of the Clinch River, associated flood plains, and the associated groundwater. The WOC system drains the WOC watershed, an area of approximately 16.8 km{sup 2} that includes ORNL and associated WAGs. The WOC system has been exposed to contaminants released from ORNL and associated operations since 1943 and continues to receive contaminants from adjacent WAGs.

  20. Uses of human reliability analysis probabilistic risk assessment results to resolve personnel performance issues that could affect safety

    International Nuclear Information System (INIS)

    O'Brien, J.N.; Spettell, C.M.

    1985-10-01

    This report is the first in a series which documents research aimed at improving the usefulness of Probabilistic Risk Assessment (PRA) results in addressing human risk issues. This first report describes the results of an assessment of how well currently available PRA data addresses human risk issues of current concern to NRC. Findings indicate that PRA data could be far more useful in addressing human risk issues with modification of the development process and documentation structure of PRAs. In addition, information from non-PRA sources could be integrated with PRA data to address many other issues. 12 tabs

  1. A mathematical model for environmental risk assessment in manufacturing industry

    Institute of Scientific and Technical Information of China (English)

    何莉萍; 徐盛明; 陈大川; 党创寅

    2002-01-01

    Environmental conscious manufacturing has become an important issue in industry because of market pressure and environmental regulations. An environmental risk assessment model was developed based on the network analytic method and fuzzy set theory. The "interval analysis method" was applied to deal with the on-site monitoring data as basic information for assessment. In addition, the fuzzy set theory was employed to allow uncertain, interactive and dynamic information to be effectively incorporated into the environmental risk assessment. This model is a simple, practical and effective tool for evaluating the environmental risk of manufacturing industry and for analyzing the relative impacts of emission wastes, which are hazardous to both human and ecosystem health. Furthermore, the model is considered useful for design engineers and decision-maker to design and select processes when the costs, environmental impacts and performances of a product are taken into consideration.

  2. CLINICAL PERFORMANCE CHARACTERISTICS OF ELECSYS® FREE-ΒHCG AND PAPP-A FOR FIRST TRIMESTER TRISOMY 21 RISK ASSESSMENT IN GESTATIONAL WEEKS 8+0 TO 14+0

    DEFF Research Database (Denmark)

    Tørring, Niels; aulesa, C; Eiben, Bernd

    2014-01-01

    with the Brahms Kryptor®, PerkinElmer AutoDELFIA® and Siemens IMMULITE® assays. Furthermore a clinical validation including generation of assay specific medians from gestational age 8+0 to 14+0 weeks, and clinical test performance of risk assessment was performed. Results The imprecision of the Elecsys free βh...

  3. The California Multimedia Risk Assessment Protocol for Alternative Fuels

    Science.gov (United States)

    Hatch, T.; Ginn, T. R.; McKone, T. E.; Rice, D. W.

    2013-12-01

    Any new fuel in California requires approval by the state agencies overseeing human and environmental health. In order to provide a systematic evaluation of new fuel impacts, California now requires a multimedia risk assessment (MMRA) for fuel approval. The fuel MMRA involves all relevant state agencies including: the California Air Resources Board (CARB), the State Water Resources Control Board (SWRCB), the Office of Environmental Health Hazards Assessment (OEHHA), and the Department of Toxic Substances Control (DTSC) overseen by the California Environmental Protection Agency (CalEPA). The lead agency for MMRAs is the CARB. The original law requiring a multimedia assessment is California Health and Safety Code 43830.8. In addition, the low carbon fuel standard (LCFS), the Global Warming Solutions Act (AB32), and the Verified Diesel Emission Control Strategy (VDECS) have provisions that can require a multimedia assessment. In this presentation, I give an overview of the California multimedia risk assessment (MMRA) for new fuels that has been recently developed and applied to several alternative fuels. The objective of the California MMRA is to assess risk of potential impacts of new fuels to multiple environmental media including: air, water, and soil. Attainment of this objective involves many challenges, including varying levels of uncertainty, relative comparison of incommensurate risk factors, and differing levels of priority assigned to risk factors. The MMRA is based on a strategy of relative risk assessment and flexible accommodation of distinct and diverse fuel formulations. The approach is tiered by design, in order to allow for sequentially more sophisticated investigations as knowledge gaps are identified and re-prioritized by the ongoing research. The assessment also involves peer review in order to provide coupling between risk assessment and stakeholder investment, as well as constructive or confrontational feedback. The multimedia assessment

  4. A framework for combining social impact assessment and risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2013-11-15

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  5. A framework for combining social impact assessment and risk assessment

    International Nuclear Information System (INIS)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary

  6. Risk-based performance indicators

    International Nuclear Information System (INIS)

    Azarm, M.A.; Boccio, J.L.; Vesely, W.E.; Lofgren, E.

    1987-01-01

    The purpose of risk-based indicators is to monitor plant safety. Safety is measured by monitoring the potential for core melt (core-melt frequency) and the public risk. Targets for these measures can be set consistent with NRC safety goals. In this process, the performance of safety systems, support systems, major components, and initiating events can be monitored using measures such as unavailability, failure or occurrence frequency. The changes in performance measures and their trends are determined from the time behavior of monitored measures by differentiation between stochastical and actual variations. Therefore, degradation, as well as improvement in the plant safety performance, can be determined. The development of risk-based performance indicators will also provide the means to trace a change in the safety measures to specific problem areas which are amenable to root cause analysis and inspection audits. In addition, systematic methods will be developed to identify specific improvement policies using the plant information system for the identified problem areas. The final product of the performance indicator project will be a methodology, and an integrated and validated set of software packages which, if properly interfaced with the logic model software of a plant, can monitor the plant performance as plant information is provided as input

  7. Risk assessment [Chapter 9

    Science.gov (United States)

    Dennis S. Ojima; Louis R. Iverson; Brent L. Sohngen; James M. Vose; Christopher W. Woodall; Grant M. Domke; David L. Peterson; Jeremy S. Littell; Stephen N. Matthews; Anantha M. Prasad; Matthew P. Peters; Gary W. Yohe; Megan M. Friggens

    2014-01-01

    What is "risk" in the context of climate change? How can a "risk-based framework" help assess the effects of climate change and develop adaptation priorities? Risk can be described by the likelihood of an impact occurring and the magnitude of the consequences of the impact (Yohe 2010) (Fig. 9.1). High-magnitude impacts are always...

  8. Evaluation of machine learning algorithms for improved risk assessment for Down's syndrome.

    Science.gov (United States)

    Koivu, Aki; Korpimäki, Teemu; Kivelä, Petri; Pahikkala, Tapio; Sairanen, Mikko

    2018-05-04

    Prenatal screening generates a great amount of data that is used for predicting risk of various disorders. Prenatal risk assessment is based on multiple clinical variables and overall performance is defined by how well the risk algorithm is optimized for the population in question. This article evaluates machine learning algorithms to improve performance of first trimester screening of Down syndrome. Machine learning algorithms pose an adaptive alternative to develop better risk assessment models using the existing clinical variables. Two real-world data sets were used to experiment with multiple classification algorithms. Implemented models were tested with a third, real-world, data set and performance was compared to a predicate method, a commercial risk assessment software. Best performing deep neural network model gave an area under the curve of 0.96 and detection rate of 78% with 1% false positive rate with the test data. Support vector machine model gave area under the curve of 0.95 and detection rate of 61% with 1% false positive rate with the same test data. When compared with the predicate method, the best support vector machine model was slightly inferior, but an optimized deep neural network model was able to give higher detection rates with same false positive rate or similar detection rate but with markedly lower false positive rate. This finding could further improve the first trimester screening for Down syndrome, by using existing clinical variables and a large training data derived from a specific population. Copyright © 2018 Elsevier Ltd. All rights reserved.

  9. Indoor air quality investigation and health risk assessment at correctional institutions.

    Science.gov (United States)

    Ofungwu, Joseph

    2005-04-01

    A comprehensive indoor air-quality (IAQ) investigation was conducted at a state correctional facility in New Jersey, USA with a lengthy history of IAQ problems. The IAQ investigation comprised preliminary indoor air screening using direct readout instrumentation, indoor air/surface wipe sampling and laboratory analysis, as well as a heating, ventilation, and air-conditioning system evaluation, and a building envelope survey. In addition to air sampling, a human health risk assessment was performed to evaluate the potential for exposure to site-related air contaminants with respect to the inmate and worker populations. The risk assessment results for the prison facility indicated the potential for significant health risks for the inmate population, possibly reflecting the effects of their confinement and extended exposure to indoor air contaminants, as compared to the prison guard and worker population. Based on the results of the risk assessment, several mitigation measures are recommended to minimize prison population health risks and improve indoor air quality at prison facilities.

  10. Risk assessment - black art or science?

    International Nuclear Information System (INIS)

    Moore, G.

    1988-01-01

    Measures of risk can be divided into two categories, those that observe or calculate the risk of a process or project, and those that rely on the level of risk as perceived by the people during the assessment. Collection of data of accidents (where cause and effect are obvious) and experiments on animals which can then be extrapolated to humans, are two ways of risk assessment. Mathematical models and computerized simulations, using either fault tree analysis or Monte Carlo methods are explained simply. Using these methods, experts are able to perceive risk fairly realistically. However, the general public's perception of risk is often quite different, as potential risk is assessed in different ways. The concept of tolerable risk is considered, particularly with reference to nuclear reactors such as Sizewell-B. The need to inform the public of safeguards and safety procedures so they have a better understanding of the risks of nuclear power is stressed. (U.K.)

  11. Reliability and Probabilistic Risk Assessment - How They Play Together

    Science.gov (United States)

    Safie, Fayssal M.; Stutts, Richard G.; Zhaofeng, Huang

    2015-01-01

    PRA methodology is one of the probabilistic analysis methods that NASA brought from the nuclear industry to assess the risk of LOM, LOV and LOC for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability and statistical data to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: What can go wrong? How likely is it? What is the severity of the degradation? Since 1986, NASA, along with industry partners, has conducted a number of PRA studies to predict the overall launch vehicles risks. Planning Research Corporation conducted the first of these studies in 1988. In 1995, Science Applications International Corporation (SAIC) conducted a comprehensive PRA study. In July 1996, NASA conducted a two-year study (October 1996 - September 1998) to develop a model that provided the overall Space Shuttle risk and estimates of risk changes due to proposed Space Shuttle upgrades. After the Columbia accident, NASA conducted a PRA on the Shuttle External Tank (ET) foam. This study was the most focused and extensive risk assessment that NASA has conducted in recent years. It used a dynamic, physics-based, integrated system analysis approach to understand the integrated system risk due to ET foam loss in flight. Most recently, a PRA for Ares I launch vehicle has been performed in support of the Constellation program. Reliability, on the other hand, addresses the loss of functions. In a broader sense, reliability engineering is a discipline that involves the application of engineering principles to the design and processing of products, both hardware and software, for meeting product reliability requirements or goals. It is a very broad design-support discipline. It has important interfaces with many other engineering disciplines. Reliability as a figure of merit (i.e. the metric) is the probability that an item will

  12. Automated Risk Assessment for School Violence: a Pilot Study.

    Science.gov (United States)

    Barzman, Drew; Ni, Yizhao; Griffey, Marcus; Bachtel, Alycia; Lin, Kenneth; Jackson, Hannah; Sorter, Michael; DelBello, Melissa

    2018-05-01

    School violence has increased over the past ten years. This study evaluated students using a more standard and sensitive method to help identify students who are at high risk for school violence. 103 participants were recruited through Cincinnati Children's Hospital Medical Center (CCHMC) from psychiatry outpatient clinics, the inpatient units, and the emergency department. Participants (ages 12-18) were active students in 74 traditional schools (i.e. non-online education). Collateral information was gathered from guardians before participants were evaluated. School risk evaluations were performed with each participant, and audio recordings from the evaluations were later transcribed and manually annotated. The BRACHA (School Version) and the School Safety Scale (SSS), both 14-item scales, were used. A template of open-ended questions was also used. This analysis included 103 participants who were recruited from 74 different schools. Of the 103 students evaluated, 55 were found to be moderate to high risk and 48 were found to be low risk based on the paper risk assessments including the BRACHA and SSS. Both the BRACHA and the SSS were highly correlated with risk of violence to others (Pearson correlations>0.82). There were significant differences in BRACHA and SSS total scores between low risk and high risk to others groups (p-values machine learning algorithm achieved an AUC of 91.02% when using the interview content to predict risk of school violence, and the AUC increased to 91.45% when demographic and socioeconomic data were added. Our study indicates that the BRACHA and SSS are clinically useful for assessing risk for school violence. The machine learning algorithm was highly accurate in assessing school violence risk.

  13. Risk analysis within environmental impact assessment of proposed construction activity

    Energy Technology Data Exchange (ETDEWEB)

    Zeleňáková, Martina; Zvijáková, Lenka

    2017-01-15

    Environmental impact assessment is an important process, prior to approval of the investment plan, providing a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to develop a specific methodology for the analysis and evaluation of environmental impacts of selected constructions – flood protection structures using risk analysis methods. The application of methodology designed for the process of environmental impact assessment will develop assumptions for further improvements or more effective implementation and performance of this process. The main objective of the paper is to improve the implementation of the environmental impact assessment process. Through the use of risk analysis methods in environmental impact assessment process, the set objective has been achieved. - Highlights: This paper is informed by an effort to develop research with the aim of: • Improving existing qualitative and quantitative methods for assessing the impacts • A better understanding of relations between probabilities and consequences • Methodology for the EIA of flood protection constructions based on risk analysis • Creative approaches in the search for environmentally friendly proposed activities.

  14. Risk analysis within environmental impact assessment of proposed construction activity

    International Nuclear Information System (INIS)

    Zeleňáková, Martina; Zvijáková, Lenka

    2017-01-01

    Environmental impact assessment is an important process, prior to approval of the investment plan, providing a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to develop a specific methodology for the analysis and evaluation of environmental impacts of selected constructions – flood protection structures using risk analysis methods. The application of methodology designed for the process of environmental impact assessment will develop assumptions for further improvements or more effective implementation and performance of this process. The main objective of the paper is to improve the implementation of the environmental impact assessment process. Through the use of risk analysis methods in environmental impact assessment process, the set objective has been achieved. - Highlights: This paper is informed by an effort to develop research with the aim of: • Improving existing qualitative and quantitative methods for assessing the impacts • A better understanding of relations between probabilities and consequences • Methodology for the EIA of flood protection constructions based on risk analysis • Creative approaches in the search for environmentally friendly proposed activities.

  15. Assessing the value of risk: Perspectives on the role of risk information in decision making

    International Nuclear Information System (INIS)

    Egan, M.; Smith, Graham; Maul, P.

    1999-01-01

    The authors of this paper profess no formal ethical or philosophical training from which to develop their position on Values in Decisions on Risk. However, as scientists with practical experience in carrying out a range of quantitative studies, we consider that we have some understanding of the strengths and weaknesses inherent in environmental risk assessment. Moreover, in attempting to use the results of such assessments, we have observed some of the ways in which quantitative risk information is used and abused. In this paper, therefore, we offer a practitioner's perspective that underlines the essential role of risk as a tool to inform and guide decisions, while at the same time emphasising the need for its proportionate use in a complex arena. We draw on experience that includes assessments for radioactive waste management and disposal, but also incorporates a range of assignments where assessment of the scale of potential environmental liabilities was a critical factor in decision making. We do not pretend to offer a resolution to the challenges laid before this Symposium, but seek to explore common themes and lessons learned regarding the role of risk information in goal-setting, performance monitoring and the overall decision process. Policy makers and regulators must act responsibly to protect confidence, not just the health of people and the environment. In doing this, to ignore risk information as a key component of strategic thinking is equally as disproportionate as making it the sole basis for decision making. There is a clear need to explain better the basis of, and motives behind, decisions - not only in terms of transparency in risk assessment but also to distinguish between the scientific and the socio-political component of the argument

  16. Assessing the value of risk: Perspectives on the role of risk information in decision making

    Energy Technology Data Exchange (ETDEWEB)

    Egan, M.; Smith, Graham; Maul, P. [QuantiSci Limited, Henley-on-Thames (United Kingdom)

    1999-12-01

    The authors of this paper profess no formal ethical or philosophical training from which to develop their position on Values in Decisions on Risk. However, as scientists with practical experience in carrying out a range of quantitative studies, we consider that we have some understanding of the strengths and weaknesses inherent in environmental risk assessment. Moreover, in attempting to use the results of such assessments, we have observed some of the ways in which quantitative risk information is used and abused. In this paper, therefore, we offer a practitioner's perspective that underlines the essential role of risk as a tool to inform and guide decisions, while at the same time emphasising the need for its proportionate use in a complex arena. We draw on experience that includes assessments for radioactive waste management and disposal, but also incorporates a range of assignments where assessment of the scale of potential environmental liabilities was a critical factor in decision making. We do not pretend to offer a resolution to the challenges laid before this Symposium, but seek to explore common themes and lessons learned regarding the role of risk information in goal-setting, performance monitoring and the overall decision process. Policy makers and regulators must act responsibly to protect confidence, not just the health of people and the environment. In doing this, to ignore risk information as a key component of strategic thinking is equally as disproportionate as making it the sole basis for decision making. There is a clear need to explain better the basis of, and motives behind, decisions - not only in terms of transparency in risk assessment but also to distinguish between the scientific and the socio-political component of the argument.

  17. Concerning ethical risk assessment

    International Nuclear Information System (INIS)

    Boeckle, F.

    1991-01-01

    After a fundamental consideration of the concept of responsibility and 'long-term responsibility' for late sequelae, the problems of an ehtical assessment of risks were illustrated: The concept of risk itself poses three problems - predicting the probability of occurrence, assessing the damage = subjective classification of the degree of damage, determining whether the advantages outweigh the risks. It is not possible to weigh the advantages and risks against each other without assessing the goals and the priorities which have been set. Here ethics is called for, because it concerns itself with the reasonableness of evaluative decisions. Its task is to enable us to become aware of and comprehend our system of values in all of its complexity in reference to real life. Ethics can only fulfill its task if it helps us to adopt an integral perspective, i.e. if it centers on the human being. 'One must assess all technical and economic innovations in terms of whether they are beneficial to the development of mankind on a long-term basis. They are only to be legitimized insofar as they prove themselves to be a means of liberating mankind and contributing to his sense of dignity and identity, as a means of bringing human beings together and encouraging them to care for one another, and as a means of protecting the natural basis of our existence. (orig./HSCH) [de

  18. Ecological risk assessment

    National Research Council Canada - National Science Library

    Suter, Glenn W; Barnthouse, L. W. (Lawrence W)

    2007-01-01

    Ecological risk assessment is commonly applied to the regulation of chemicals, the remediation of contaminated sites, the monitoring of importation of exotic organisms, the management of watersheds...

  19. Trial of risk assessment of a hypothetical nuclear facility

    International Nuclear Information System (INIS)

    Terao, Norichika; Suzuki, Mitsutoshi

    2013-01-01

    An equation for risk assessment in physical protection is shown by a probability of an adversary attack during a period time, P A , a probability of system effectiveness, P E , and consequence value, C. In addition, P E is shown as the multiplication of a probability of interruption of the facility, P I , by a probability of neutralization by response force, P N . In this study, it is assumed that an adversary assaults a hypothetical nuclear facility. The new quantification method about P A and P I in risk evaluation formula is devised, and risk assessment is attempted. In case of P A , the possibility of assaults against a nuclear facility is discussed by using terrorism data written in the open source database of terrorism, Global Terrorism Database (GTD), summarized by University of Maryland. In addition, it is discussed about P I by using the way of thinking of a risk assessment tool, EASI, developed by the Sandia National Laboratories (SNL). In the hypothetical nuclear facility, the performance of response force, sensors, and communication is expressed quantitatively by probability distribution based on some assumptions. (author)

  20. Baseline risk assessment for groundwater contamination at the uranium mill tailings site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1990-11-01

    The Gunnison Baseline Risk Assessment for Groundwater Contamination at the Uranium Mill Tailings Site was performed to determine if long-term use of groundwater from domestic wells near the site has a potential for adverse health effects. The risk assessment was based on the results of sampling domestic wells during 1989--1990. A risk assessment evaluates health risks by comparing the amount of a contaminant taken in by a person with the amount of the contaminant that may be toxic. The Gunnison Risk Assessment used high intake values to estimate the maximum levels a person might be exposed to. The results of the risk assessment are divided into cancer (carcinogenic) risks and non-carcinogenic risks. Five key contaminants were evaluated for adverse health risks: uranium, manganese, lead antimony, and cadmium. Due to the potential health risks and the unavoidable uncertainties associated with limited groundwater and toxicity data, it is prudent public health policy to provide a permanent alternate water supply. Additionally, providing a permanent alternate water supply is cost-effective compared to long-term routine monitoring

  1. A risk assessment of the SAFR plant

    International Nuclear Information System (INIS)

    Rutherford, P.D.; Mills, J.C.; Lancet, R.T.; Nourjah, P.

    1987-01-01

    The Sodium Advanced Fast Reactor (SAFR) is a modular, advanced concept, Liquid Metal Reactor (LMR), funded by the U.S., and designed by Rockwell International, Bechtel Corporation, and Combustion Engineering. SAFR utilizes the inherently safe features of small fast reactors, including natural convection decay heat removal systems, a self-actuated shutdown system (SASS) and inherent core response to design basis events without scram including transient overpower (TOP), loss of flow (LOF), and loss of heat sink (LOHS) events. A Level 3 probabilistic risk assessment (PRA) has been performed which demonstrates considerable reduction in plant and public risk compared to current commercial reactors. (orig./HSCH)

  2. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2001-01-01

    The Nevada Risk Assessment/Management Program is part of a national effort by the U.S. Department of Energy (Grant DE-FG01-96EW56093) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the Nevada Risk Assessment/Management Program and presents a synopsis of the effort that began in 1995 and will officially conclude on April 30, 2000. (author)

  3. Caries risk assessment in children

    DEFF Research Database (Denmark)

    Twetman, S

    2016-01-01

    PURPOSE: To summarise the findings of recent systematic reviews (SR) covering caries risk assessment in children, updated with recent primary studies. METHODS: A search for relevant papers published 2012-2014 was conducted in electronic databases. The systematic reviews were quality assessed...... displayed a high risk of bias. CONCLUSIONS: Based on the present summary of literature, it may be concluded: (1) a caries risk assessment should be carried out at the child's first dental visit and reassessments should be done during childhood (D); (2) multivariate models display a better accuracy than...... the use of single predictors and this is especially true for preschool children (C); (3) there is no clearly superior method to predict future caries and no evidence to support the use of one model, program, or technology before the other (C); and (4) the risk category should be linked to appropriate...

  4. [Regional atmospheric environment risk source identification and assessment].

    Science.gov (United States)

    Zhang, Xiao-Chun; Chen, Wei-Ping; Ma, Chun; Zhan, Shui-Fen; Jiao, Wen-Tao

    2012-12-01

    Identification and assessment for atmospheric environment risk source plays an important role in regional atmospheric risk assessment and regional atmospheric pollution prevention and control. The likelihood exposure and consequence assessment method (LEC method) and the Delphi method were employed to build a fast and effective method for identification and assessment of regional atmospheric environment risk sources. This method was applied to the case study of a large coal transportation port in North China. The assessment results showed that the risk characteristics and the harm degree of regional atmospheric environment risk source were in line with the actual situation. Fast and effective identification and assessment of risk source has laid an important foundation for the regional atmospheric environmental risk assessment and regional atmospheric pollution prevention and control.

  5. Design definition study of a life/cruise fan technology V/STOL aircraft. Volume 2, addendum 2: Program risk assessment

    Science.gov (United States)

    1975-01-01

    The results are presented of a risk assessment study conducted on two technology aircraft. The aircraft system components were reviewed and assessed for risk based on: (1) complexity relative to state-of-the-art, (2) manufacturing and qualification testing, (3) availability and delays, and (4) cost/schedule impact. These assessments were based on five risk nomenclatures: low, minor, moderate, high, and extreme. Each aircraft system was assigned an overall risk rating depending upon its contribution to the capability of the aircraft to achieve the performance goals. The slightly lower Sabreliner performance margin is due to the restricted flight envelope, the fixed landing gear, and internal fuel capacity. The Sabreliner with retractable gear and allowed to fly at its best speed and altitude would reflect performance margins similar to the New Airframe. These significant margins, inherent with the MCAIR three gas generator/three fan propulsion system, are major modifiers to risk assessment of both aircraft. The estimated risk and the associated key system and performance areas are tabulated.

  6. OPPT workplan risk assessment for Trichloroethylene ...

    Science.gov (United States)

    The assessment will focus on uses of TCE as a degreaser and in consumer products used by individuals in the arts/crafts field. Given the range of endpoints (cancer, non-cancer; the latter includes potential effects on the developing fetus), it is expected that susceptible populations would be children (as bystanders physically near the actual consumer use of the products) and adults of all ages (including pregnant women). Thus, the assessment will focus on all human/lifestages. EPA anticipates issuing draft risk assessments for public review and comment as they are completed. At the conclusion of the review process, if an assessment of specific uses indicates significant risk, EPA will evaluate and pursue appropriate risk reduction actions, as warranted. If an assessment indicates no significant risk, EPA will conclude its current work on assessment of those specified targeted uses of that chemical. Over time, additional chemicals will be added to the work plan as more data are developed and more chemicals screened.

  7. Tools for Microbiological risk assessment

    DEFF Research Database (Denmark)

    Bassett, john; Nauta, Maarten; Lindqvist, Roland

    can increase the understanding of microbiological risks in foods. It is timely to inform food safety professionals about the availability and utility of MRA tools. Therefore, the focus of this report is to aid the food safety manager by providing a concise summary of the tools available for the MRA......Microbiological Risk Assessment (MRA) has emerged as a comprehensive and systematic approach for addressing the risk of pathogens in specific foods and/or processes. At government level, MRA is increasingly recognised as a structured and objective approach to understand the level of risk in a given...... food/pathogen scenario. Tools developed so far support qualitative and quantitative assessments of the risk that a food pathogen poses to a particular population. Risk can be expressed as absolute numbers or as relative (ranked) risks. The food industry is beginning to appreciate that the tools for MRA...

  8. Modeling for operational event risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has been using risk models to evaluate the risk significance of operational events in U.S. commercial nuclear power plants for more seventeen years. During that time, the models have evolved in response to the advances in risk assessment technology and insights gained with experience. Evaluation techniques fall into two categories, initiating event assessments and condition assessments. The models used for these analyses have become uniquely specialized for just this purpose

  9. Risk assessment on hazards for decommissioning safety of a nuclear facility

    International Nuclear Information System (INIS)

    Jeong, Kwan-Seong; Lee, Kune-Woo; Lim, Hyeon-Kyo

    2010-01-01

    A decommissioning plan should be followed by a qualitative and quantitative safety assessment of it. The safety assessment of a decommissioning plan is applied to identify the potential (radiological and non-radiological) hazards and risks. Radiological and non-radiological hazards arise during decommissioning activities. The non-radiological or industrial hazards to which workers are subjected during a decommissioning and dismantling process may be greater than those experienced during an operational lifetime of a facility. Workers need to be protected by eliminating or reducing the radiological and non-radiological hazards that may arise during routine decommissioning activities and as well as during accidents. The risk assessment method was developed by using risk matrix and fuzzy inference logic, on the basis of the radiological and non-radiological hazards for a decommissioning safety of a nuclear facility. Fuzzy inference of radiological and non-radiological hazards performs a mapping from radiological and non-radiological hazards to risk matrix. Defuzzification of radiological and non-radiological hazards is the conversion of risk matrix and priorities to the maximum criterion method and the mean criterion method. In the end, a composite risk assessment methodology, to rank the risk level on radiological and non-radiological hazards of the decommissioning tasks and to prioritize on the risk level of the decommissioning tasks, by simultaneously combining radiological and non-radiological hazards, was developed.

  10. A root cause analysis approach to risk assessment of a pipeline network for Kuwait Oil Company

    Energy Technology Data Exchange (ETDEWEB)

    Davies, Ray J.; Alfano, Tony D. [Det Norske Veritas (DNV), Rio de Janeiro, RJ (Brazil); Waheed, Farrukh [Kuwait Oil Company, Ahmadi (Kuwait); Komulainen, Tiina [Kongsberg Oil and Gas Technologies, Sandvika (Norway)

    2009-07-01

    A large scale risk assessment was performed by Det Norske Veritas (DNV) for the entire Kuwait Oil Company (KOC) pipeline network. This risk assessment was unique in that it incorporated the assessment of all major sources of process related risk faced by KOC and included root cause management system related risks in addition to technical risks related to more immediate causes. The assessment was conducted across the entire pipeline network with the scope divided into three major categories:1. Integrity Management 2. Operations 3. Management Systems Aspects of integrity management were ranked and prioritized using a custom algorithm based on critical data sets. A detailed quantitative risk assessment was then used to further evaluate those issues deemed unacceptable, and finally a cost benefit analysis approach was used to compare and select improvement options. The operations assessment involved computer modeling of the entire pipeline network to assess for bottlenecks, surge and erosion analysis, and to identify opportunities within the network that could potentially lead to increased production. The management system assessment was performed by conducting a gap analysis on the existing system and by prioritizing those improvement actions that best aligned with KOC's strategic goals for pipelines. Using a broad and three-pronged approach to their overall risk assessment, KOC achieved a thorough, root cause analysis-based understanding of risks to their system as well as a detailed list of recommended remediation measures that were merged into a 5-year improvement plan. (author)

  11. Cable Hot Shorts and Circuit Analysis in Fire Risk Assessment

    International Nuclear Information System (INIS)

    LaChance, Jeffrey; Nowlen, Steven P.; Wyant, Frank

    1999-01-01

    Under existing methods of probabilistic risk assessment (PRA), the analysis of fire-induced circuit faults has typically been conducted on a simplistic basis. In particular, those hot-short methodologies that have been applied remain controversial in regards to the scope of the assessments, the underlying methods, and the assumptions employed. To address weaknesses in fire PRA methodologies, the USNRC has initiated a fire risk analysis research program that includes a task for improving the tools for performing circuit analysis. The objective of this task is to obtain a better understanding of the mechanisms linking fire-induced cable damage to potentially risk-significant failure modes of power, control, and instrumentation cables. This paper discusses the current status of the circuit analysis task

  12. Ethical dimensions in assessing technical risks

    International Nuclear Information System (INIS)

    Birnbacher, D.

    1991-01-01

    Contrary to the present tendency of partially impact-independent technology assessment, the author does not see a difference between a risk-benefit analysis and an ethical technology assessment. As long as the risk-benefit analysis is truly comprehensive, both fall together. This does not mean that convictions of those who have their doubts about some new technologies, independently of impact assessments, may be disregarded in purely consequential risk evaluations. On the contrary, qualms of representatives of these principles, just as any other stable non-acceptance, have to be included as aggravating negative elements in technology assessments. (orig./HSCH) [de

  13. Total cardiovascular disease risk assessment: a review.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2011-09-01

    The high risk strategy for the prevention of cardiovascular disease (CVD) requires an assessment of an individual\\'s total CVD risk so that the most intensive risk factor management can be directed towards those at highest risk. Here we review developments in the assessment and estimation of total CVD risk.

  14. Risk assessment of carcinogens in food

    International Nuclear Information System (INIS)

    Barlow, Susan; Schlatter, Josef

    2010-01-01

    Approaches for the risk assessment of carcinogens in food have evolved as scientific knowledge has advanced. Early methods allowed little more than hazard identification and an indication of carcinogenic potency. Evaluation of the modes of action of carcinogens and their broad division into genotoxic and epigenetic (non-genotoxic, non-DNA reactive) carcinogens have played an increasing role in determining the approach followed and provide possibilities for more detailed risk characterisation, including provision of quantitative estimates of risk. Reliance on experimental animal data for the majority of risk assessments and the fact that human exposures to dietary carcinogens are often orders of magnitude below doses used in experimental studies has provided a fertile ground for discussion and diverging views on the most appropriate way to offer risk assessment advice. Approaches used by national and international bodies differ, with some offering numerical estimates of potential risks to human health, while others express considerable reservations about the validity of quantitative approaches requiring extrapolation of dose-response data below the observed range and instead offer qualitative advice. Recognising that qualitative advice alone does not provide risk managers with information on which to prioritise the need for risk management actions, a 'margin of exposure' approach for substances that are both genotoxic and carcinogenic has been developed, which is now being used by the World Health Organization and the European Food Safety Authority. This review describes the evolution of risk assessment advice on carcinogens and discusses examples of ways in which carcinogens in food have been assessed in Europe.

  15. Risk assessment of carcinogens in food.

    Science.gov (United States)

    Barlow, Susan; Schlatter, Josef

    2010-03-01

    Approaches for the risk assessment of carcinogens in food have evolved as scientific knowledge has advanced. Early methods allowed little more than hazard identification and an indication of carcinogenic potency. Evaluation of the modes of action of carcinogens and their broad division into genotoxic and epigenetic (non-genotoxic, non-DNA reactive) carcinogens have played an increasing role in determining the approach followed and provide possibilities for more detailed risk characterisation, including provision of quantitative estimates of risk. Reliance on experimental animal data for the majority of risk assessments and the fact that human exposures to dietary carcinogens are often orders of magnitude below doses used in experimental studies has provided a fertile ground for discussion and diverging views on the most appropriate way to offer risk assessment advice. Approaches used by national and international bodies differ, with some offering numerical estimates of potential risks to human health, while others express considerable reservations about the validity of quantitative approaches requiring extrapolation of dose-response data below the observed range and instead offer qualitative advice. Recognising that qualitative advice alone does not provide risk managers with information on which to prioritise the need for risk management actions, a "margin of exposure" approach for substances that are both genotoxic and carcinogenic has been developed, which is now being used by the World Health Organization and the European Food Safety Authority. This review describes the evolution of risk assessment advice on carcinogens and discusses examples of ways in which carcinogens in food have been assessed in Europe.

  16. Assessment of Cardiovascular Disease Risk in South Asian Populations

    Directory of Open Access Journals (Sweden)

    S. Monira Hussain

    2013-01-01

    Full Text Available Although South Asian populations have high cardiovascular disease (CVD burden in the world, their patterns of individual CVD risk factors have not been fully studied. None of the available algorithms/scores to assess CVD risk have originated from these populations. To explore the relevance of CVD risk scores for these populations, literature search and qualitative synthesis of available evidence were performed. South Asians usually have higher levels of both “classical” and nontraditional CVD risk factors and experience these at a younger age. There are marked variations in risk profiles between South Asian populations. More than 100 risk algorithms are currently available, with varying risk factors. However, no available algorithm has included all important risk factors that underlie CVD in these populations. The future challenge is either to appropriately calibrate current risk algorithms or ideally to develop new risk algorithms that include variables that provide an accurate estimate of CVD risk.

  17. Risk Scan: A Review of Risk Assessment Capability and Maturity within the Canadian Safety and Security Program

    Science.gov (United States)

    2014-06-01

    SCADA / ICS Cyber Test Lab initiated in 2013 Psychosocial – academic research exists,; opportunity for sharing and developing impact assessment...ecosystems and species at risk), accidents / system failure (rail; pipelines ; ferries CSSP strategy for the North Focus on regional l(and local) problem...Guidance; business planning; environmental scan; proposal evaluation; and performance measurement Program Risk Management – Guidelines for project

  18. A Comparative Risk Assessment of Extended Integrated Leak Rate Testing Intervals

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Ji Yong; Hwang, Seok Won; Lee, Byung Sik [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2009-10-15

    This paper presents the risk impacts of extending the Integrated Leak Rate Testing (ILRT) intervals (from five years to ten years) of Yonggwang (YGN) Unit 1 and 2. These risk impacts depended on the annual variances of meteorological data and resident population. Main comparisons were performed between the initial risk assessment (2005) for the purpose of extending ILRT interval and risk reassessment (2009) where the changed plant internal configurations (core inventory and radioisotope release fraction) and plant external alterations (wind directions, rainfall and population distributions) were monitored. The reassessment showed that there was imperceptible risk increase when the ILRT interval was extended compared to the initial risk assessment. In addition, the increased value of the Large Early Release Frequency (LERF) also satisfied the acceptance guideline proposed on Reg. Guide 1.174. The MACCS II code was used for evaluating the offsite consequence analysis. The primary risk index were used as the Probabilistic Population Dose (PPD) by considering the early effects within 80 km. The Probabilistic Safety Assessment (PSA) of YGN 1 and 2 was applied to evaluate the accident frequency of each source term category and the used PSA scope was limited to internal event.

  19. Assessing the risk of recurrent venous thromboembolism – a practical approach

    Directory of Open Access Journals (Sweden)

    Fahrni J

    2015-08-01

    Full Text Available Jennifer Fahrni,1 Marc Husmann,2 Silvia B Gretener,3 Hong H Keo1 1Division of Angiology, Medical University Clinic, Kantonsspital Aarau AG, Aarau, Switzerland; 2Clinic for Angiology, University Hospital, University of Zurich, Zürich, Switzerland; 3Clinic for Angiology Oberaargau, Langenthal, Switzerland Abstract: Recurrent venous thromboembolism (VTE is associated with increased morbidity and mortality. This risk is lowered by anticoagulation, with a large effect in the initial phase following the venous thromboembolic event, and with a smaller effect in terms of secondary prevention of recurrence when extended anticoagulation is performed. On the other hand, extended anticoagulation is associated with an increased risk of major bleeding and thus leads to morbidity and mortality. Therefore, it is necessary to assess the risk of recurrence for VTE on an individual basis, and a recommendation for secondary prophylaxis should be specifically based on risk calculation of recurrence of VTE and bleeding. In this review, we provide a comprehensive summary of relevant risk factors for recurrent VTE and a practical approach for assessing the risk of recurrence in daily practice. Keywords: thrombosis, hemorrhage, risk assessment 

  20. Risk Assessment Uncertainties in Cybersecurity Investments

    Directory of Open Access Journals (Sweden)

    Andrew Fielder

    2018-06-01

    Full Text Available When undertaking cybersecurity risk assessments, it is important to be able to assign numeric values to metrics to compute the final expected loss that represents the risk that an organization is exposed to due to cyber threats. Even if risk assessment is motivated by real-world observations and data, there is always a high chance of assigning inaccurate values due to different uncertainties involved (e.g., evolving threat landscape, human errors and the natural difficulty of quantifying risk. Existing models empower organizations to compute optimal cybersecurity strategies given their financial constraints, i.e., available cybersecurity budget. Further, a general game-theoretic model with uncertain payoffs (probability-distribution-valued payoffs shows that such uncertainty can be incorporated in the game-theoretic model by allowing payoffs to be random. This paper extends previous work in the field to tackle uncertainties in risk assessment that affect cybersecurity investments. The findings from simulated examples indicate that although uncertainties in cybersecurity risk assessment lead, on average, to different cybersecurity strategies, they do not play a significant role in the final expected loss of the organization when utilising a game-theoretic model and methodology to derive these strategies. The model determines robust defending strategies even when knowledge regarding risk assessment values is not accurate. As a result, it is possible to show that the cybersecurity investments’ tool is capable of providing effective decision support.

  1. Lessons learned: Needs for improving human health risk assessment at USDOE Sites

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.; Daniels, J.I.; Layton, D.W.; Anspaugh, L.R.

    1993-09-01

    Realistic health risk assessments were performed in a pilot study of three U.S. Department of Energy (USDOE) sites. These assessments, covering a broad spectrum of data and methods, were used to identify needs for improving future health risk assessments at USDOE sites. Topics receiving specific recommendations for additional research include: choice of distributions for Monte Carlo simulation; estimation of risk reduction; analysis of the U.S. Department of Agriculture Database on food and nutrient intakes; investigations on effects of food processing on contaminant levels; background food and environmental concentrations of contaminants; method for handling exposures to groundwater plumes, methods for analyzing less than lifetime exposure to carcinogens; and improvement of bioaccumulation factors

  2. Taking risk assessment and management to the next level - 59395

    International Nuclear Information System (INIS)

    Nelson, Jerel; Morton, Russel Lee; Castillo, Carlos; Dyer, George; Johnson, Natalie; McSwain, James T.; Kruskall, Gary Nick

    2012-01-01

    Document available in abstract form only. Full text of publication follows: A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact

  3. System Analysis and Risk Assessment (SARA) system

    International Nuclear Information System (INIS)

    Krantz, E.A.; Russell, K.D.; Stewart, H.D.; Van Siclen, V.S.

    1986-01-01

    Utilization of Probabilistic Risk Assessment (PRA) related information in the day-to-day operation of plant systems has, in the past, been impracticable due to the size of the computers needed to run PRA codes. This paper discusses a microcomputer-based database system which can greatly enhance the capability of operators or regulators to incorporate PRA methodologies into their routine decision making. This system is called the System Analysis and Risk Assessment (SARA) system. SARA was developed by EG and G Idaho, Inc. at the Idaho National Engineering Laboratory to facilitate the study of frequency and consequence analyses of accident sequences from a large number of light water reactors (LWRs) in this country. This information is being amassed by several studies sponsored by the United States Nuclear Regulatory Commission (USNRC). To meet the need of portability and accessibility, and to perform the variety of calculations necessary, it was felt that a microcomputer-based system would be most suitable

  4. TRECII: a computer program for transportation risk assessment

    International Nuclear Information System (INIS)

    Franklin, A.L.

    1980-05-01

    A risk-based fault tree analysis method has been developed at the Pacific Northwest Laboratory (PNL) for analysis of nuclear fuel cycle operations. This methodology was developed for the Department of Energy (DOE) as a risk analysis tool for evaluating high level waste management systems. A computer package consisting of three programs was written at that time to assist in the performance of risk assessment: ACORN (draws fault trees), MFAULT (analyzes fault trees), and RAFT (calculates risk). This methodology evaluates release consequences and estimates the frequency of occurrence of these consequences. This document describes an additional risk calculating code which can be used in conjunction with two of the three codes for transportation risk assessment. TRECII modifies the definition of risk used in RAFT (prob. x release) to accommodate release consequences in terms of fatalities. Throughout this report risk shall be defined as probability times consequences (fatalities are one possible health effect consequence). This methodology has been applied to a variety of energy material transportation systems. Typically the material shipped has been radioactive, although some adaptation to fossil fuels has occurred. The approach is normally applied to truck or train transport systems with some adaptation to pipelines and aircraft. TRECII is designed to be used primarily in conjunction with MFAULT; however, with a moderate amount of effort by the user, it can be implemented independent of the risk analysis package developed at PNL. Code description and user instructions necessary for the implementation of the TRECII program are provided

  5. Insurance World in Transition: Changes in Global Risk Taking and Risk Assessment

    Science.gov (United States)

    Michel, Gero; Tiampo, Kristy

    2015-04-01

    Catastrophe insurance risk assessment, risk taking, and regulation has evolved over the last 20 years and is gearing up for significant further change in the years ahead. Changes in regulation and influx of capital have put profit margins for catastrophe risk products under pressure despite the fact that changes in climate as well as increasing insurance penetration is expected to heighten demand. As a result, reinsurance strategies are moving away from catastrophe risk. In addition, lower margins require cheaper and more efficient risk assessment methods and processes which are contrary to evolving analytical tools and methods that had increased expenses in line with growing margins over the last decade. New capital providers are less familiar with and less willing to accept complex supply chains for risk management, relationship-driven business and tedious data exchange and management processes. Risk takers claim new measures and ask for more flexibility in the use of tools. The current concepts of catastrophe insurance risk assessment are hence under thorough scrutiny. This presentation deals with the changing landscape in catastrophe insurance risk assessment and risk hedging and discusses changes in catastrophe risk assessment products and demand. How likely is it that private, small and nimble hazard and risk consulting groups - increasingly emanating from larger science organizations - will replace large established firms in their role to assess risk? What role do public-private academic partnerships play in assuming risk for catastrophe insurance and what role could they play in the future? What are the opportunities and downsides of the current changes in risk taking and hedging? What is needed from the scientific community in order to fill the gaps in risk management and who is likely to take advantage of the current changes?

  6. Transferability and robustness of real-time freeway crash risk assessment.

    Science.gov (United States)

    Shew, Cameron; Pande, Anurag; Nuworsoo, Cornelius

    2013-09-01

    This study examines the data from single loop detectors on northbound (NB) US-101 in San Jose, California to estimate real-time crash risk assessment models. The classification tree and neural network based crash risk assessment models developed with data from NB US-101 are applied to data from the same freeway, as well as to the data from nearby segments of the SB US-101, NB I-880, and SB I-880 corridors. The performance of crash risk assessment models on these nearby segments is the focus of this research. The model applications show that it is in fact possible to use the same model for multiple freeways, as the underlying relationships between traffic data and crash risk remain similar. The framework provided here may be helpful to authorities for freeway segments with newly installed traffic surveillance apparatuses, since the real-time crash risk assessment models from nearby freeways with existing infrastructure would be able to provide a reasonable estimate of crash risk. The robustness of the model output is also assessed by location, time of day, and day of week. The analysis shows that on some locations the models may require further learning due to higher than expected false positive (e.g., the I-680/I-280 interchange on US-101 NB) or false negative rates. The approach for post-processing the results from the model provides ideas to refine the model prior to or during the implementation. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  7. A systems framework for national assessment of climate risks to infrastructure

    Science.gov (United States)

    Dawson, Richard J.; Thompson, David; Johns, Daniel; Wood, Ruth; Darch, Geoff; Chapman, Lee; Hughes, Paul N.; Watson, Geoff V. R.; Paulson, Kevin; Bell, Sarah; Gosling, Simon N.; Powrie, William; Hall, Jim W.

    2018-06-01

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment. This article is part of the theme issue `Advances in risk assessment for climate change adaptation policy'.

  8. A systems framework for national assessment of climate risks to infrastructure

    Science.gov (United States)

    Thompson, David; Johns, Daniel; Darch, Geoff; Paulson, Kevin

    2018-01-01

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment. This article is part of the theme issue ‘Advances in risk assessment for climate change adaptation policy’. PMID:29712793

  9. Health risk assessment of exposure to ionizing radiation

    International Nuclear Information System (INIS)

    Ogata, Hiromitsu

    2011-01-01

    Risk assessment is an essential process for evaluating the human health effects of exposure to ionizing radiation and for determining acceptable levels of exposure. There are two major components of radiation risk assessment: a measure of exposure level and a measure of disease occurrence. For quantitative estimation of health risks, it is important to evaluate the association between exposure and disease occurrence using epidemiological or experimental data. In these approaches, statistical risk models are used particularly for estimating cancer risks related to exposure to low levels of radiation. This paper presents a summary of basic models and methods of risk assessment for studying exposure-risk relationships. Moreover, quantitative risk estimates are subject to several sources of uncertainty due to inherent limitations in risk assessment studies. This paper also discusses the limitations of radiation risk assessment. (author)

  10. Utilizing toxicogenomic data to understand chemical mechanism of action in risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Vickie S., E-mail: wilson.vickie@epa.gov [National Health and Environmental Effects Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711 (United States); Keshava, Nagalakshmi [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460 (United States); Hester, Susan [National Health and Environmental Effects Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711 (United States); Segal, Deborah; Chiu, Weihsueh [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460 (United States); Thompson, Chad M. [ToxStrategies, Inc., 23501 Cinco Ranch Blvd., Suite G265, Katy, TX 77494 (United States); Euling, Susan Y. [National Center for Environmental Assessment, Office of Research and Development, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460 (United States)

    2013-09-15

    The predominant role of toxicogenomic data in risk assessment, thus far, has been one of augmentation of more traditional in vitro and in vivo toxicology data. This article focuses on the current available examples of instances where toxicogenomic data has been evaluated in human health risk assessment (e.g., acetochlor and arsenicals) which have been limited to the application of toxicogenomic data to inform mechanism of action. This article reviews the regulatory policy backdrop and highlights important efforts to ultimately achieve regulatory acceptance. A number of research efforts on specific chemicals that were designed for risk assessment purposes have employed mechanism or mode of action hypothesis testing and generating strategies. The strides made by large scale efforts to utilize toxicogenomic data in screening, testing, and risk assessment are also discussed. These efforts include both the refinement of methodologies for performing toxicogenomics studies and analysis of the resultant data sets. The current issues limiting the application of toxicogenomics to define mode or mechanism of action in risk assessment are discussed together with interrelated research needs. In summary, as chemical risk assessment moves away from a single mechanism of action approach toward a toxicity pathway-based paradigm, we envision that toxicogenomic data from multiple technologies (e.g., proteomics, metabolomics, transcriptomics, supportive RT-PCR studies) can be used in conjunction with one another to understand the complexities of multiple, and possibly interacting, pathways affected by chemicals which will impact human health risk assessment.

  11. Utilizing toxicogenomic data to understand chemical mechanism of action in risk assessment

    International Nuclear Information System (INIS)

    Wilson, Vickie S.; Keshava, Nagalakshmi; Hester, Susan; Segal, Deborah; Chiu, Weihsueh; Thompson, Chad M.; Euling, Susan Y.

    2013-01-01

    The predominant role of toxicogenomic data in risk assessment, thus far, has been one of augmentation of more traditional in vitro and in vivo toxicology data. This article focuses on the current available examples of instances where toxicogenomic data has been evaluated in human health risk assessment (e.g., acetochlor and arsenicals) which have been limited to the application of toxicogenomic data to inform mechanism of action. This article reviews the regulatory policy backdrop and highlights important efforts to ultimately achieve regulatory acceptance. A number of research efforts on specific chemicals that were designed for risk assessment purposes have employed mechanism or mode of action hypothesis testing and generating strategies. The strides made by large scale efforts to utilize toxicogenomic data in screening, testing, and risk assessment are also discussed. These efforts include both the refinement of methodologies for performing toxicogenomics studies and analysis of the resultant data sets. The current issues limiting the application of toxicogenomics to define mode or mechanism of action in risk assessment are discussed together with interrelated research needs. In summary, as chemical risk assessment moves away from a single mechanism of action approach toward a toxicity pathway-based paradigm, we envision that toxicogenomic data from multiple technologies (e.g., proteomics, metabolomics, transcriptomics, supportive RT-PCR studies) can be used in conjunction with one another to understand the complexities of multiple, and possibly interacting, pathways affected by chemicals which will impact human health risk assessment

  12. Consideration of liners and covers in performance assessments

    Energy Technology Data Exchange (ETDEWEB)

    Phifer, Mark A. [Savannah River National Laboratory, Aiken, SC (United States); Seitz, Robert R. [Savannah River National Laboratory, Aiken, SC (United States); Suttora, Linda C. [USDOE Enviromental Management, Washington, DC (United States)

    2014-09-18

    On-site disposal cells are in use and being considered at several United States Department of Energy (USDOE) sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These disposal cells are typically regulated by States and/or the U.S. Environmental Protection Agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in addition to having to comply with requirements in DOE Order 435.1, Radioactive Waste Management due to the radioactive waste. The USDOE-Environmental Management Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these CERCLA disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to CERCLA risk assessments and DOE Order 435.1 performance assessments in support of a Record of Decision and Disposal Authorization Statement, respectively. One of the issues considered by the working group, which is addressed in this report, was how to appropriately consider the performance of covers and liners/leachate collections systems in the context of a DOE Order 435.1 performance assessment (PA). This same information may be appropriate for consideration within CERCLA risk assessments for these facilities. These OSDCs are generally developed to meet hazardous waste (HW) disposal design standards under the Resource Conservation and Recovery Act (RCRA) as well as the DOE Order 435.1 performance based standards for disposal of radioactive waste. To meet the standards for HW, the facilities typically include engineered covers and liner/leachate collection systems. Thus, when considering such facilities in the context of a DOE Order 435.1 PA, there is a need to address the evolution of performance of covers and liner/leachate collection systems in the context of meeting a performance standard considering time

  13. Approach and Strategy for Performing Ecological Risk Assessments for the Department of Energy Oak Ridge Field Office Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Suter, G.W. II

    1992-01-01

    This technical memorandum provides guidance for planning and performing ecological risk assessments (ERAs) on the Oak Ridge Reservation (ORR). This work was performed under Work Breakdown Structure 1.4.12.2.3.04.07.02 (Activity Data Sheet 8304) and meets an Environmental Restoration Program milestone for FY 95. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance developed for the ORR and relevant U.S. Environmental Protection Agency documents and guidance. The general approach and strategy presented herein was developed for the ORR, but it could be applicable to other complex CERCLA sites that possess significant ecological resources.

  14. Sovereign default risk assessment

    NARCIS (Netherlands)

    Rijken, H.A.; Altman, E.I.

    2013-01-01

    We propose a new approach toward assessing sovereign risk by examining rigorously the health and aggregate default risk of a nation's private corporate sector. Models can be utilised to measure the probability of default of the non-financial sector cumulatively for five years, both as an absolute

  15. Chemical Exposure Assessment Program at Los Alamos National Laboratory: A risk based approach

    International Nuclear Information System (INIS)

    Stephenson, D.J.

    1996-01-01

    The University of California Contract And DOE Order 5480.10 require that Los Alamos National Laboratory (LANL) perform health hazard assessments/inventories of all employee workplaces. In response to this LANL has developed the Chemical Exposure Assessment Program. This program provides a systematic risk-based approach to anticipation, recognition, evaluation and control of chemical workplace exposures. Program implementation focuses resources on exposures with the highest risks for causing adverse health effects. Implementation guidance includes procedures for basic characterization, qualitative risk assessment, quantitative validation, and recommendations and reevaluation. Each component of the program is described. It is shown how a systematic method of assessment improves documentation, retrieval, and use of generated exposure information

  16. Safety analysis, risk assessment, and risk acceptance criteria

    International Nuclear Information System (INIS)

    Jamali, K.

    1997-01-01

    This paper discusses a number of topics that relate safety analysis as documented in the Department of Energy (DOE) safety analysis reports (SARs), probabilistic risk assessments (PRA) as characterized primarily in the context of the techniques that have assumed some level of formality in commercial nuclear power plant applications, and risk acceptance criteria as an outgrowth of PRA applications. DOE SARs of interest are those that are prepared for DOE facilities under DOE Order 5480.23 and the implementing guidance in DOE STD-3009-94. It must be noted that the primary area of application for DOE STD-3009 is existing DOE facilities and that certain modifications of the STD-3009 approach are necessary in SARs for new facilities. Moreover, it is the hazard analysis (HA) and accident analysis (AA) portions of these SARs that are relevant to the present discussions. Although PRAs can be qualitative in nature, PRA as used in this paper refers more generally to all quantitative risk assessments and their underlying methods. HA as used in this paper refers more generally to all qualitative risk assessments and their underlying methods that have been in use in hazardous facilities other than nuclear power plants. This discussion includes both quantitative and qualitative risk assessment methods. PRA has been used, improved, developed, and refined since the Reactor Safety Study (WASH-1400) was published in 1975 by the Nuclear Regulatory Commission (NRC). Much debate has ensued since WASH-1400 on exactly what the role of PRA should be in plant design, reactor licensing, 'ensuring' plant and process safety, and a large number of other decisions that must be made for potentially hazardous activities. Of particular interest in this area is whether the risks quantified using PRA should be compared with numerical risk acceptance criteria (RACs) to determine whether a facility is 'safe.' Use of RACs requires quantitative estimates of consequence frequency and magnitude

  17. Performance assessment of an alpha waste deposit in a clay formation

    International Nuclear Information System (INIS)

    Quercia, F.; D'Alessandro, M.; Saltelli, A.

    1987-01-01

    The probabilistic code LISA (Long term Isolation Safety Assessment) has been used to assess the risk related to the disposal of alpha waste in a geological formation. The code has been modified to take into account waste form properties and leaching processes pertinent to alpha waste produced at fuel reprocessing plants. The exercise refers to a repository in a deep clay formation located at Harwell (U.K.) where some hydrogeological data were available. Radionuclide migration through repository and geological barriers has been simulated together with biosphere contamination. Results of the assessment are presented as dose rate (or risk) distributions; a sensitivity analysis on input parameters has been performed

  18. Landslide susceptibility and risk assessment: specificities for road networks

    Science.gov (United States)

    Pellicani, Roberta; Argentiero, Ilenia; Parisi, Alessandro; Spilotro, Giuseppe

    2017-04-01

    A regional-scale assessment of landslide susceptibility and risk along the main road corridors crossing the provincial territory of Matera (Basilicata Region, Southern Italy) was carried out. The entire provincial road network extends for about 1,320 km through a territory, of which represents the main connection infrastructure among thirty-one municipalities due to the lack of an efficient integrated transportation system through the whole regional territory. For this reason, the strategic importance of these roads consists in their uniqueness in connecting every urban center with the socio-economic surrounding context. These roads and their vehicular traffic are continuously exposed to instability processes (about the 40% of the total length is disrupted by landslides), characterized both by high intensity and low frequency and by low intensity and high frequency. This last typology, consisting in small shallow landslides, is particularly hazardous for the roads since it is widespread along the road network, its occurrence is connected to rainfalls and determines high vulnerability conditions for the road in terms of interruption of vehicular traffic. A GIS-based heuristic-bivariate statistical predictive model was performed to assess and map the landslide susceptibility in the study area, by using a polynomial function of eight predisposing factors, weighted according to their influence on the landslide phenomena, recognized and collected in an inventory. Susceptibility associated to small shallow phenomena was assessed by using a polynomial function of specific factors, such as slope angle and aspect, lithological outcrops, rainfalls, etc. In absence of detailed input data, the spatial distribution of landslide risk along the road corridors was assessed and mapped using a qualitative hazard-consequence matrix approach, by which risk is obtained by combining hazard categories with consequence classes pairwise in a two-dimensional table or matrix. Landslide

  19. Contents of risk assessments to support the retrieval and closure of tanks for the Washington State Department of Ecology

    International Nuclear Information System (INIS)

    MANN, F.M.

    2003-01-01

    Before the Integrated Mission Acceleration Plan can be performed, risk assessments of various options must be performed for ORP, DOE Headquarters, and the Washington State Dept. of Ecology. This document focuses on the risk assessments for Ecology

  20. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  1. Risk assessment for transport operations

    International Nuclear Information System (INIS)

    Appleton, P.R.; Miles, J.C.

    1990-01-01

    The world-wide safety of the transport of radioactive material is based on the IAEA Transport Regulations. Risk assessment can provide quantitative data to help in the demonstration, understanding and improvement of the effectiveness of the Regulations in assuring safety. In this Paper the methodology, data and computer codes necessary and available for transport risk assessment are reviewed. Notable examples of assessments carried out over the past 15 years are briefly described along with current research, and the benefits and limitations of the techniques are discussed. (author)

  2. Quality assurance study of caries risk assessment performance by clinical faculty members in a school of dentistry.

    Science.gov (United States)

    Rechmann, Peter; Featherstone, John D B

    2014-09-01

    The goal of this quality assurance study was to explore the decision making of clinical faculty members at the University of California, San Francisco School of Dentistry predoctoral dental clinic in terms of caries risk level assignment using the caries risk assessment (CRA) as part of the Caries Management by Risk Assessment (CAMBRA) concept. This research was done in part to determine if additional training and calibration were needed for these faculty members. The study tested the reliability and reproducibility of the caries risk levels assigned by different clinical teachers who completed CRA forms for simulated patients. In the first step, five clinical teachers assigned caries risk levels for thirteen simulated patients. Six months later, the same five plus an additional nine faculty members assigned caries risk levels to the same thirteen simulated and nine additional cases. While the intra-examiner reliability with weighted kappa strength of agreement was very high, the inter-examiner agreements with a gold standard were on average only moderate. In total, 20 percent of the presented high caries risk cases were underestimated at caries levels too low, even when obvious caries disease indicators were present. This study suggests that more consistent training and calibration of clinical faculty members as well as students are needed.

  3. A performance-oriented and risk-based regulation for containment testing

    International Nuclear Information System (INIS)

    Dey, M.

    1994-01-01

    In August 1992, the NRC initiated a major initiative to develop requirements for containment testing that are less prescriptive, and more performance-oriented and risk-based. This action was a result of public comments and several studies that concluded that the economic burden of certain, present containment testing requirements are not commensurate with their safety benefits. The rulemaking will include consideration of relaxing the allowable containment leakage rate, increasing the interval for the integrated containment test, and establishing intervals for the local containment leak rate tests based on their performance. A study has been conducted to provide technical information for establishing the performance criteria for containment tests, the allowable leakage rate, commensurate with its significance to total public risk. The study used results of a recent comprehensive study conducted by the NRC, NUREG-1150, 'Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants,' to examine the sensitivity of containment leakage to public risk. Risk was found to be insensitive to containment leakage rate up to levels of about 100 percent-volume per day for certain types of containments. PRA methods have also been developed to establish risk-based intervals for containment tests based on their past experience. Preliminary evaluations show that increasing the interval for the integrated containment leakage test from three times to once every ten years would have an insignificant impact on public risk. Preliminary analyses of operational experience data for local leak rate tests show that performance-based testing, valves and penetrations that perform well are tested less frequently, is feasible with marginal impact on safety. The above technical studies are being used to develop efficient (cost-effective) requirements for containment tests. (author). 4 refs., 2 figs

  4. Assessing Extinction Risk: Integrating Genetic Information

    Directory of Open Access Journals (Sweden)

    Jason Dunham

    1999-06-01

    Full Text Available Risks of population extinction have been estimated using a variety of methods incorporating information from different spatial and temporal scales. We briefly consider how several broad classes of extinction risk assessments, including population viability analysis, incidence functions, and ranking methods integrate information on different temporal and spatial scales. In many circumstances, data from surveys of neutral genetic variability within, and among, populations can provide information useful for assessing extinction risk. Patterns of genetic variability resulting from past and present ecological and demographic events, can indicate risks of extinction that are otherwise difficult to infer from ecological and demographic analyses alone. We provide examples of how patterns of neutral genetic variability, both within, and among populations, can be used to corroborate and complement extinction risk assessments.

  5. The conceptual framework for physical risk assessment in multi-purpose workplaces

    Directory of Open Access Journals (Sweden)

    Lasota Andrzej Marek

    2017-01-01

    Full Text Available In industry work related musculoskeletal disorders (WRMSDs are still a common problem which frequent cause of health problems, sick leave and it can result in decreased productivity, quality of work and increased absenteeism. Though, traditional manufacturing work practices do not enough take into account task variability issues during the work design – assessment process. Variations in task content and organizational work performance are due to effective use of equipments and reaching high level of productivity. But this variation has impact on work demand and risk to WRMSDs and makes some difficulties with assessment of risk. Therefore, this study aims develop a framework for assessment multi-purpose workplaces. The proposed method integrates complementary concepts of widely known techniques used for evaluation of physical risk factors to WRMSDs on workplaces. Additionally the research framework is highlighting major differences in worker’s exposure to WRMSDs risk, potential impact on awkward postures, and how these findings can be used for finding solutions in a future ergonomic intervention.

  6. Software Tool Implementing the Fuzzy AHP Method in Ecological Risk Assessment

    Directory of Open Access Journals (Sweden)

    Radionovs Andrejs

    2017-12-01

    Full Text Available Due to the increased spread of invasive animals and plants in the territory of Latvia, the necessity of ecological risk assessment related to such kind of spread has grown lately. In cases with sufficient statistical data, the risk assessment may be successfully performed on the basis of statistical methods. The amount of statistical data in the context of spread of invasive animals and plants is pretty poor; therefore, the only method of ecological risk assessment remains subjective judgements of experts. The present paper proposes using a programming tool for ecological risk analysis elaborated by the authors. With the help of this programming tool the method of Fuzzy Analytical Hierarchical Process is implemented. The elements of the pairwise comparison matrix are allowed to be expressed by triangular and trapezoidal fuzzy sets. The presented tool makes it possible to design the fuzzy pair-wise comparison matrix and process the results in a user-friendly way.

  7. Risk assessment of metal vapor arcing

    Science.gov (United States)

    Hill, Monika C. (Inventor); Leidecker, Henning W. (Inventor)

    2009-01-01

    A method for assessing metal vapor arcing risk for a component is provided. The method comprises acquiring a current variable value associated with an operation of the component; comparing the current variable value with a threshold value for the variable; evaluating compared variable data to determine the metal vapor arcing risk in the component; and generating a risk assessment status for the component.

  8. Understanding Suicide Across the Lifespan: A United States Perspective of Suicide Risk Factors, Assessment & Management.

    Science.gov (United States)

    Steele, Ian H; Thrower, Natasha; Noroian, Paul; Saleh, Fabian M

    2018-01-01

    Suicide is a troubling, preventable phenomenon. Prior to attempts, individuals often seek help, prompting practitioners to perform risk assessments that ideally use evidence-based risk management strategies. A literature review was performed using Harvard Countway Library of Medicine, Google Scholar, PubMed. Key words used were "Forensic Science," "Suicide Risk Management," "Pediatric Suicide Risk Factors," "Adult Suicide Risk Factors," "Geriatric Suicide Risk Factors," "Suicide Risk Assessment." Parameters limited articles to studies/reviews completed in the past twenty years in the United States. Results indicated predictors of suicide in juveniles were insomnia, burdensomeness, and recent conflicts with family or a romantic partner. Adults had greater risk if male, substance abusing, with marital/job loss. Elderly individuals with multiple medical comorbidities, hopelessness, and isolation were at higher risk. Everyone evaluated should be screened for access to firearms. Management of suicide risk involves providing the least restrictive form of treatment which maintains an individual's safety. © 2017 American Academy of Forensic Sciences.

  9. Review of the Diablo Canyon probabilistic risk assessment

    International Nuclear Information System (INIS)

    Bozoki, G.E.; Fitzpatrick, R.G.; Bohn, M.P.; Sabek, M.G.; Ravindra, M.K.; Johnson, J.J.

    1994-08-01

    This report details the review of the Diablo Canyon Probabilistic Risk Assessment (DCPRA). The study was performed under contract from the Probabilistic Risk Analysis Branch, Office of Nuclear Reactor Research, USNRC by Brookhaven National Laboratory. The DCPRA is a full scope Level I effort and although the review touched on all aspects of the PRA, the internal events and seismic events received the vast majority of the review effort. The report includes a number of independent systems analyses sensitivity studies, importance analyses as well as conclusions on the adequacy of the DCPRA for use in the Diablo Canyon Long Term Seismic Program

  10. Assessing reservoir operations risk under climate change

    Science.gov (United States)

    Brekke, L.D.; Maurer, E.P.; Anderson, J.D.; Dettinger, M.D.; Townsley, E.S.; Harrison, A.; Pruitt, T.

    2009-01-01

    Risk-based planning offers a robust way to identify strategies that permit adaptive water resources management under climate change. This paper presents a flexible methodology for conducting climate change risk assessments involving reservoir operations. Decision makers can apply this methodology to their systems by selecting future periods and risk metrics relevant to their planning questions and by collectively evaluating system impacts relative to an ensemble of climate projection scenarios (weighted or not). This paper shows multiple applications of this methodology in a case study involving California's Central Valley Project and State Water Project systems. Multiple applications were conducted to show how choices made in conducting the risk assessment, choices known as analytical design decisions, can affect assessed risk. Specifically, risk was reanalyzed for every choice combination of two design decisions: (1) whether to assume climate change will influence flood-control constraints on water supply operations (and how), and (2) whether to weight climate change scenarios (and how). Results show that assessed risk would motivate different planning pathways depending on decision-maker attitudes toward risk (e.g., risk neutral versus risk averse). Results also show that assessed risk at a given risk attitude is sensitive to the analytical design choices listed above, with the choice of whether to adjust flood-control rules under climate change having considerably more influence than the choice on whether to weight climate scenarios. Copyright 2009 by the American Geophysical Union.

  11. A route-specific system for risk assessment of radioactive materials transportation accidents

    International Nuclear Information System (INIS)

    Moore, J.E.; Sandquist, G.M.; Slaughter, D.M.

    1995-01-01

    A low-cost, powerful geographic information system (GIS) that operates on a personal computer was integrated into a software system to provide route specific assessment of the risks associated with the atmospheric release of radioactive and hazardous materials in transportation accidents. The highway transportation risk assessment (HITRA) software system described here combines a commercially available GIS (TransCAD) with appropriate models and data files for route- and accident-specific factors, such as meteorology, dispersion, demography, and health effects to permit detailed analysis of transportation risk assessment. The HITRA system allows a user to interactively select a highway or railroad route from a GIS database of major US transportation routes. A route-specific risk assessment is then performed to estimate downwind release concentrations and the resulting potential health effects imposed on the exposed population under local environmental and temporal conditions. The integration of GIS technology with current risk assessment methodology permits detailed analysis coupled with enhanced user interaction. Furthermore, HITRA provides flexibility and documentation for route planning, updating and improving the databases required for evaluating specific transportation routes, changing meteorological and environmental conditions, and local demographics

  12. Risk assessment research and technology assessment

    International Nuclear Information System (INIS)

    Albach, H.; Schade, D.; Sinn, H.

    1991-01-01

    The concepts and approaches for technology assessment, the targets and scientific principles, as well as recognizable deficits and recommendations concerning purposeful strategies for the promotion of this research field require a dialog between those concerned. Conception, deficits, and the necessary measures for risk assessment research and technology assessment were discussed as well as ethical aspects. The problematic nature of using organisms altered through genetic engineering in the open land, traffic and transport, site restoration, nuclear energy, and isotope applications were subjects particularly dealt with. (DG) [de

  13. Risk-based systems analysis for emerging technologies: Applications of a technology risk assessment model to public decision making

    International Nuclear Information System (INIS)

    Quadrel, M.J.; Fowler, K.M.; Cameron, R.; Treat, R.J.; McCormack, W.D.; Cruse, J.

    1995-01-01

    The risk-based systems analysis model was designed to establish funding priorities among competing technologies for tank waste remediation. The model addresses a gap in the Department of Energy's (DOE's) ''toolkit'' for establishing funding priorities among emerging technologies by providing disciplined risk and cost assessments of candidate technologies within the context of a complete remediation system. The model is comprised of a risk and cost assessment and a decision interface. The former assesses the potential reductions in risk and cost offered by new technology relative to the baseline risk and cost of an entire system. The latter places this critical information in context of other values articulated by decision makers and stakeholders in the DOE system. The risk assessment portion of the model is demonstrated for two candidate technologies for tank waste retrieval (arm-based mechanical retrieval -- the ''long reach arm'') and subsurface barriers (close-coupled chemical barriers). Relative changes from the base case in cost and risk are presented for these two technologies to illustrate how the model works. The model and associated software build on previous work performed for DOE's Office of Technology Development and the former Underground Storage Tank Integrated Demonstration, and complement a decision making tool presented at Waste Management 1994 for integrating technical judgements and non-technical (stakeholder) values when making technology funding decisions

  14. Nuclear Computerized Library for Assessing Reactor Risk (NUCLARR)

    International Nuclear Information System (INIS)

    Gilmore, W.E.; Blackman, H.S.; Ryan, T.G.

    1986-01-01

    The Nuclear Computerized Library for Assessing Reactor Risk (NUCLARR) program is a multiyear effort sponsored by the NRC and is being conducted at the Idaho National Engineering Laboratory (INEL). The goal of this program is to establish and operate computerized data base management tools for the human reliability data bank specification developed by Comer and Donovan. The NRC and the risk analysis community recognized that implementing a fully functional library would not be feasible, or practical, without the aid of computerized tools for management and manipulation of its data sources. The end users of the NUCLARR can be classified into three categories according to specific needs. The first category is those users interested in reviewing individual data sources for a given situation. The second category of users selects multiple data sources for a specific case, summarizing the information, and performing comparative studies. The last category of users interfaces the NUCLARR with other programming applications, such as other data banks, and simulation models of risk assessment. Project status is provided in the paper

  15. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  16. A generalized Dynamic Overflow Risk Assessment (DORA) for urban drainage RTC

    DEFF Research Database (Denmark)

    Vezzaro, Luca; Grum, Morten

    2012-01-01

    An innovative generalized approach for integrated real time control of urban drainage systems is presented. The Dynamic Overflow Risk Assessment (DORA) strategy tries to minimize the expected overflow risk by considering (i) the water volume presently stored in the drainage network, (ii) the expe......An innovative generalized approach for integrated real time control of urban drainage systems is presented. The Dynamic Overflow Risk Assessment (DORA) strategy tries to minimize the expected overflow risk by considering (i) the water volume presently stored in the drainage network, (ii...... to reduce Combined Sewer Overflow loads and to optimize the flow discharged to the wastewater treatment plant. Also, the inclusion of forecasts and their uncertainty contributed to further improve the performance of drainage systems. The results of this paper will contribute to a wider usage of global RTC...

  17. Risk Assessment of the Main Control Room Fire Using Fire Simulations

    International Nuclear Information System (INIS)

    Kang, Dae Il; Kim, Kilyoo; Jang, Seung Cheol

    2013-01-01

    KAERI is performing a fire PSA for a reference plant, Ulchin Unit 3, as part of developing the Korean site risk profile (KSRP). Fire simulations of the MCR fire were conducted using the CFAST (Consolidated Fire Growth and Smoke Transport) model and FDS (fire dynamic simulator) to improve the uncertainty in the MCR fire risk analysis. Using the fire simulation results, the MCR abandonment risk was evaluated. Level 1 PSA (probabilistic safety assessment) results of Ulchin Unit 3 using the EPRI PRA (probabilistic risk assessment) implementation guide showed that the MCR (main control room) fire was the main contributor to the core damage frequency. Recently, U. S. NRC and EPRI developed NUREG/CR-6850 to provide state-of-the-art methods, tools, and data for the conduct of a fire PSA for a commercial NPP

  18. Assessment of Interpersonal Risk (AIR) in Adults with Learning Disabilities and Challenging Behaviour--Piloting a New Risk Assessment Tool

    Science.gov (United States)

    Campbell, Martin; McCue, Michael

    2013-01-01

    A new risk assessment tool, "Assessment of Interpersonal Risk" (AIR), was piloted and evaluated to measure risk factors and compatibility between individuals living in an assessment and treatment unit in one NHS area. The adults with learning disabilities in this unit had severe and enduring mental health problems and/or behaviour that is severely…

  19. Risk assessment in long-term storage of spent nuclear fuel

    International Nuclear Information System (INIS)

    Ahn, T.; Guttmann, J.; Mohseni, A.

    2013-01-01

    This paper presents probabilistic risk-informed approaches that the Nuclear Regulatory Commission (NRC) staff is planning to consider in preparing regulatory bases for long-term storage of spent nuclear fuel (SNF) for up to 300 years. Due to uncertainties associated with long-term SNF storage, the NRC is considering a probabilistic risk-informed approach as well as a deterministic design-based approach. The uncertainties considered here are primarily associated with materials aging of the canister and SNF in the cask system during long-term storage of SNF. This paper discusses some potential risk contributors involved in long-term SNF storage. Methods of performance evaluation are presented that assess the various types of risks involved. They include deterministic evaluation, probabilistic evaluation, and consequence assessment under normal conditions and the conditions of accidents and natural hazards. Some potentially important technical issues resulting from the consideration of a probabilistic risk-informed evaluation of the cask system performance are discussed for the canister and SNF integrity. These issues are also discussed in comparison with the deterministic approach for comparison purposes, as appropriate. Probabilistic risk-informed methods can provide insights that deterministic methods may not capture. Two specific examples include stress corrosion cracking of the canister and hydrogen-induced cladding failure. These examples are discussed in more detail, in terms of their effects on radionuclide release and nuclear subcriticality associated with the failure. The plan to consider the probabilistic risk-informed approaches is anticipated to provide helpful regulatory insights for long-term storage of SNF that provide reasonable assurance for public health and safety. (authors)

  20. Key risk indicators for accident assessment conditioned on pre-crash vehicle trajectory.

    Science.gov (United States)

    Shi, X; Wong, Y D; Li, M Z F; Chai, C

    2018-08-01

    Accident events are generally unexpected and occur rarely. Pre-accident risk assessment by surrogate indicators is an effective way to identify risk levels and thus boost accident prediction. Herein, the concept of Key Risk Indicator (KRI) is proposed, which assesses risk exposures using hybrid indicators. Seven metrics are shortlisted as the basic indicators in KRI, with evaluation in terms of risk behaviour, risk avoidance, and risk margin. A typical real-world chain-collision accident and its antecedent (pre-crash) road traffic movements are retrieved from surveillance video footage, and a grid remapping method is proposed for data extraction and coordinates transformation. To investigate the feasibility of each indicator in risk assessment, a temporal-spatial case-control is designed. By comparison, Time Integrated Time-to-collision (TIT) performs better in identifying pre-accident risk conditions; while Crash Potential Index (CPI) is helpful in further picking out the severest ones (the near-accident). Based on TIT and CPI, the expressions of KRIs are developed, which enable us to evaluate risk severity with three levels, as well as the likelihood. KRI-based risk assessment also reveals predictive insights about a potential accident, including at-risk vehicles, locations and time. Furthermore, straightforward thresholds are defined flexibly in KRIs, since the impact of different threshold values is found not to be very critical. For better validation, another independent real-world accident sample is examined, and the two results are in close agreement. Hierarchical indicators such as KRIs offer new insights about pre-accident risk exposures, which is helpful for accident assessment and prediction. Copyright © 2018 Elsevier Ltd. All rights reserved.

  1. Intrusion detection in cloud computing based attack patterns and risk assessment

    Directory of Open Access Journals (Sweden)

    Ben Charhi Youssef

    2017-05-01

    Full Text Available This paper is an extension of work originally presented in SYSCO CONF.We extend our previous work by presenting the initial results of the implementation of intrusion detection based on risk assessment on cloud computing. The idea focuses on a novel approach for detecting cyber-attacks on the cloud environment by analyzing attacks pattern using risk assessment methodologies. The aim of our solution is to combine evidences obtained from Intrusion Detection Systems (IDS deployed in a cloud with risk assessment related to each attack pattern. Our approach presents a new qualitative solution for analyzing each symptom, indicator and vulnerability analyzing impact and likelihood of distributed and multi-steps attacks directed to cloud environments. The implementation of this approach will reduce the number of false alerts and will improve the performance of the IDS.

  2. Dynamic Bayesian Networks for Context-Aware Fall Risk Assessment

    Directory of Open Access Journals (Sweden)

    Gregory Koshmak

    2014-05-01

    Full Text Available Fall incidents among the elderly often occur in the home and can cause serious injuries affecting their independent living. This paper presents an approach where data from wearable sensors integrated in a smart home environment is combined using a dynamic Bayesian network. The smart home environment provides contextual data, obtained from environmental sensors, and contributes to assessing a fall risk probability. The evaluation of the developed system is performed through simulation. Each time step is represented by a single user activity and interacts with a fall sensors located on a mobile device. A posterior probability is calculated for each recognized activity or contextual information. The output of the system provides a total risk assessment of falling given a response from the fall sensor.

  3. Assessing Advanced Airway Management Performance in a National Cohort of Emergency Medical Services Agencies.

    Science.gov (United States)

    Wang, Henry E; Donnelly, John P; Barton, Dustin; Jarvis, Jeffrey L

    2018-05-01

    Although often the focus of quality improvement efforts, emergency medical services (EMS) advanced airway management performance has few national comparisons, nor are there many assessments with benchmarks accounting for differences in agency volume or patient mix. We seek to assess variations in advanced airway management and conventional intubation performance in a national cohort of EMS agencies. We used EMS data from ESO Solutions, a national EMS electronic health record system. We identified EMS emergency responses with attempted advanced airway management (conventional intubation, rapid sequence intubation, sedation-assisted intubation, supraglottic airway insertion, and cricothyroidotomy). We also separately examined cases with initial conventional intubation. We determined EMS agency risk-standardized advanced airway management and initial conventional intubation success rates by using mixed-effects regression models, fitting agency as a random intercept, adjusting for patient age, sex, race, cardiac arrest, or trauma status, and use of rapid sequence or sedation-assisted intubation, and accounting for reliability variations from EMS agency airway volume. We assessed changes in agency advanced airway management and initial conventional intubation performance rank after risk and reliability adjustment. We also identified high and low performers (reliability-adjusted and risk-standardized success confidence intervals falling outside the mean). During 2011 to 2015, 550 EMS agencies performed 57,209 advanced airway management procedures. Among 401 EMS agencies with greater than or equal to 10 advanced airway management procedures, there were a total of 56,636 procedures. Median reliability-adjusted and risk-standardized EMS agency advanced airway management success was 92.9% (interquartile range 90.1% to 94.8%; minimum 58.2%; maximum 99.0%). There were 56 advanced airway management low-performing and 38 high-performing EMS agencies. Among 342 agencies with

  4. Significance of earthquake risk in nuclear power plant probabilistic risk assessments

    International Nuclear Information System (INIS)

    Sues, R.H.; Amico, P.J.; Campbell, R.D.

    1990-01-01

    During the last eight years, approximately 25 utility-sponsored probabilistic risk assessments (PRAs) have been conducted for US nuclear reactors. Of these, ten have been published, seven of which have included complete seismic risk assessment. The results of the seven published PRAs are reviewed here in order to ascertain the significance of the risk due to earthquake initiating events. While PRA methodology has been in a state of development over the past seven years, and the results are subject to interpretation (as discussed in the paper), from the review conducted it is clear that earthquake-induced initiating events are important risk contributors. It is concluded that earthquake initiating events should not be dismissed, a priori, in any nuclear plant risk assessment. (orig.)

  5. Chemical Risk Assessment: Traditional vs Public Health ...

    Science.gov (United States)

    Preventing adverse health impacts from exposures to environmental chemicals is fundamental to protecting individual and public health. When done efficiently and properly, chemical risk assessment enables risk management actions that minimize the incidence and impacts of environmentally-induced diseases related to chemical exposure. However, traditional chemical risk assessment is faced with multiple challenges with respect to predicting and preventing disease in human populations, and epidemiological studies increasingly report observations of adverse health effects at exposure levels predicted from animal studies to be safe for humans. This discordance reinforces concerns about the adequacy of contemporary risk assessment practices (Birnbaum, Burke, & Jones, 2016) for protecting public health. It is becoming clear that to protect public health more effectively, future risk assessments will need to use the full range of available data, draw on innovative methods to integrate diverse data streams, and consider health endpoints that also reflect the range of subtle effects and morbidities observed in human populations. Given these factors, there is a need to reframe chemical risk assessment to be more clearly aligned with the public health goal of minimizing environmental exposures associated with disease. Preventing adverse health impacts from exposures to environmental chemicals is fundamental to protecting individual and public health. Chemical risk assessments

  6. Risk-assessment methodology for fast breeder reactors

    International Nuclear Information System (INIS)

    Ott, K.O.

    1976-04-01

    The methods applied or proposed for risk assessment of nuclear reactors are reviewed, particularly with respect to their applicability for risk assessment of future commercial fast breeder reactors. All methods are based on the calculation of accident consequences for relatively few accident scenarios. The role and general impact of uncertainties in fast-reactor accident analysis are discussed. The discussion shows the need for improvement of the methodology. A generalized and improved risk-assessment methodology is outlined and proposed (accident-spectra-progression approach). The generalization consists primarily of an explicit treatment of uncertainties throughout the accident progression. The results of this method are obtained in form of consequence distributions. The width and shape of the distributions depend in part on the superposition of the uncertainties. The first moment of the consequence distribution gives an improved prediction of the ''average'' consequence. The higher-consequence moments can be used for consideration of risk aversion. The assessment of the risk of one or a certain number of nuclear reactors can only provide an ''isolated'' risk assessment. The general problem of safety risk assessment and its relation to public acceptance of certain modes of power production is a much broader problem area, which is also discussed

  7. The evolution of violence risk assessment.

    Science.gov (United States)

    Monahan, John; Skeem, Jennifer L

    2014-10-01

    Many instruments have been published in recent years to improve the ability of mental health clinicians to estimate the likelihood that an individual will behave violently toward others. Increasingly, these instruments are being applied in response to laws that require specialized risk assessments. In this review, we present a framework that goes beyond the "clinical" and "actuarial" dichotomy to describe a continuum of structured approaches to risk assessment. Despite differences among them, there is little evidence that one instrument predicts violence better than another. We believe that these group-based instruments are useful for assessing an individual's risk, and that the instrument should be chosen based on the purpose of the assessment.

  8. Environmental Comparative Risk Assessment: A Case Study

    International Nuclear Information System (INIS)

    Ali, M.M.

    2007-01-01

    Health and environmental impacts associated with energy production and industrial activities as well as food production and agricultural activities have had great concern in the last decades. Early activities emerged in late 80s of the last century through an Inter- Agency project (lAEA, UNDY, WHO, ... ) on the comparative risk assessment from energy systems and industrial complexes. A work-shop on Risk Assessment and Management in large industrial areas was held in Alexandria Egypt on 20-33 Det 1993, sponsored by IAEA. Several conferences, experts work groups and workshops were held there of Recent trends in determining risks are: 1. Use of probabilistic risk assessment approach to identify hazardous activities and accident scenario. 2. development of data base on failure probabilities and appropriate physical models. 3. Development of related directives and regulations and criteria Comparative risk assessment case study as a tool for comparing risk is emphasized Criteria of exposure to human and ecological risks are addressed

  9. SU-F-T-246: Evaluation of Healthcare Failure Mode And Effect Analysis For Risk Assessment

    International Nuclear Information System (INIS)

    Harry, T; Manger, R; Cervino, L; Pawlicki, T

    2016-01-01

    Purpose: To evaluate the differences between the Veteran Affairs Healthcare Failure Modes and Effect Analysis (HFMEA) and the AAPM Task Group 100 Failure and Effect Analysis (FMEA) risk assessment techniques in the setting of a stereotactic radiosurgery (SRS) procedure were compared respectively. Understanding the differences in the techniques methodologies and outcomes will provide further insight into the applicability and utility of risk assessments exercises in radiation therapy. Methods: HFMEA risk assessment analysis was performed on a stereotactic radiosurgery procedure. A previous study from our institution completed a FMEA of our SRS procedure and the process map generated from this work was used for the HFMEA. The process of performing the HFMEA scoring was analyzed, and the results from both analyses were compared. Results: The key differences between the two risk assessments are the scoring criteria for failure modes and identifying critical failure modes for potential hazards. The general consensus among the team performing the analyses was that scoring for the HFMEA was simpler and more intuitive then the FMEA. The FMEA identified 25 critical failure modes while the HFMEA identified 39. Seven of the FMEA critical failure modes were not identified by the HFMEA and 21 of the HFMEA critical failure modes were not identified by the FMEA. HFMEA as described by the Veteran Affairs provides guidelines on which failure modes to address first. Conclusion: HFMEA is a more efficient model for identifying gross risks in a process than FMEA. Clinics with minimal staff, time and resources can benefit from this type of risk assessment to eliminate or mitigate high risk hazards with nominal effort. FMEA can provide more in depth details but at the cost of elevated effort.

  10. SU-F-T-246: Evaluation of Healthcare Failure Mode And Effect Analysis For Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Harry, T [Oregon State University, Corvallis, OR (United States); University of California, San Diego, La Jolla, CA (United States); Manger, R; Cervino, L; Pawlicki, T [University of California, San Diego, La Jolla, CA (United States)

    2016-06-15

    Purpose: To evaluate the differences between the Veteran Affairs Healthcare Failure Modes and Effect Analysis (HFMEA) and the AAPM Task Group 100 Failure and Effect Analysis (FMEA) risk assessment techniques in the setting of a stereotactic radiosurgery (SRS) procedure were compared respectively. Understanding the differences in the techniques methodologies and outcomes will provide further insight into the applicability and utility of risk assessments exercises in radiation therapy. Methods: HFMEA risk assessment analysis was performed on a stereotactic radiosurgery procedure. A previous study from our institution completed a FMEA of our SRS procedure and the process map generated from this work was used for the HFMEA. The process of performing the HFMEA scoring was analyzed, and the results from both analyses were compared. Results: The key differences between the two risk assessments are the scoring criteria for failure modes and identifying critical failure modes for potential hazards. The general consensus among the team performing the analyses was that scoring for the HFMEA was simpler and more intuitive then the FMEA. The FMEA identified 25 critical failure modes while the HFMEA identified 39. Seven of the FMEA critical failure modes were not identified by the HFMEA and 21 of the HFMEA critical failure modes were not identified by the FMEA. HFMEA as described by the Veteran Affairs provides guidelines on which failure modes to address first. Conclusion: HFMEA is a more efficient model for identifying gross risks in a process than FMEA. Clinics with minimal staff, time and resources can benefit from this type of risk assessment to eliminate or mitigate high risk hazards with nominal effort. FMEA can provide more in depth details but at the cost of elevated effort.

  11. Source specific risk assessment of indoor aerosol particles

    Energy Technology Data Exchange (ETDEWEB)

    Koivisto, A.J.

    2013-05-15

    In the urban environment, atmospheric aerosols consist mainly of pollutants from anthropogenic sources. The majority of these originate from traffic and other combustion processes. A fraction of these pollutants will penetrate indoors via ventilation. However, indoor air concentrations are usually predominated by indoor sources due to the small amount of dilution air. In modern societies, people spend most of their time indoors. Thus, their exposure is controlled mainly by indoor concentrations from indoor sources. During the last decades, engineering of nanosized structures has created a new field of material science. Some of these materials have been shown to be potentially toxic to human health. The greatest potential for exposure to engineered nanomaterials (ENMs) occurs in the workplace during production and handling of ENMs. In an exposure assessment, both gaseous and particulate matter pollutants need to be considered. The toxicities of the particles usually depend on the source and age. With time, particle morphology and composition changes due to their tendency to undergo coagulation, condensation and evaporation. The PM exposure risk is related to source specific emissions, and thus, in risk assessment one needs to define source specific exposures. This thesis describes methods for source specific risk assessment of airborne particulate matter. It consists of studies related to workers' ENM exposures during the synthesis of nanoparticles, packing of agglomerated TiO{sub 2} nanoparticles, and handling of nanodiamonds. Background particles were distinguished from the ENM concentrations by using different measurement techniques and indoor aerosol modelings. Risk characterization was performed by using a source specific exposure and calculated dose levels in units of particle number and mass. The exposure risk was estimated by using non-health based occupational exposure limits for ENMs. For the nanosized TiO{sub 2}, the risk was also assessed from dose

  12. The Risk Assessment at the Workplace of Assembly Operation

    Directory of Open Access Journals (Sweden)

    Marek Burda

    2014-01-01

    Full Text Available Risk Assessment Process by FMEA method involve hazard identification, risk assessment and risk control processes and their input is fundamental to a successful EH&S system. This Risk assessment tool follows the general process and requirements of the Health and Safety Risk Assessment Procedure.

  13. A counterfactual p-value approach for benefit-risk assessment in clinical trials.

    Science.gov (United States)

    Zeng, Donglin; Chen, Ming-Hui; Ibrahim, Joseph G; Wei, Rachel; Ding, Beiying; Ke, Chunlei; Jiang, Qi

    2015-01-01

    Clinical trials generally allow various efficacy and safety outcomes to be collected for health interventions. Benefit-risk assessment is an important issue when evaluating a new drug. Currently, there is a lack of standardized and validated benefit-risk assessment approaches in drug development due to various challenges. To quantify benefits and risks, we propose a counterfactual p-value (CP) approach. Our approach considers a spectrum of weights for weighting benefit-risk values and computes the extreme probabilities of observing the weighted benefit-risk value in one treatment group as if patients were treated in the other treatment group. The proposed approach is applicable to single benefit and single risk outcome as well as multiple benefit and risk outcomes assessment. In addition, the prior information in the weight schemes relevant to the importance of outcomes can be incorporated in the approach. The proposed CPs plot is intuitive with a visualized weight pattern. The average area under CP and preferred probability over time are used for overall treatment comparison and a bootstrap approach is applied for statistical inference. We assess the proposed approach using simulated data with multiple efficacy and safety endpoints and compare its performance with a stochastic multi-criteria acceptability analysis approach.

  14. Comparative risk assessment of severe accidents in the energy sector

    International Nuclear Information System (INIS)

    Burgherr, Peter; Hirschberg, Stefan

    2014-01-01

    Comparative assessment of accident risks in the energy sector is a key aspect in a comprehensive evaluation of sustainability and energy security concerns. Safety performance of energy systems can have important implications on the environmental, economic and social dimensions of sustainability as well as availability, acceptability and accessibility aspects of energy security. Therefore, this study provides a broad comparison of energy technologies based on the objective expression of accident risks for complete energy chains. For fossil chains and hydropower the extensive historical experience available in PSI's Energy-related Severe Accident Database (ENSAD) is used, whereas for nuclear a simplified probabilistic safety assessment (PSA) is applied, and evaluations of new renewables are based on a combination of available data, modeling, and expert judgment. Generally, OECD and EU 27 countries perform better than non-OECD. Fatality rates are lowest for Western hydropower and nuclear as well as for new renewables. In contrast, maximum consequences can be by far highest for nuclear and hydro, intermediate for fossil, and very small for new renewables, which are less prone to severe accidents. Centralized, low-carbon technology options could generally contribute to achieve large reductions in CO 2 -emissions; however, the principal challenge for both fossil with Carbon Capture and Storage and nuclear is public acceptance. Although, external costs of severe accidents are significantly smaller than those caused by air pollution, accidents can have disastrous and long-term impacts. Overall, no technology performs best or worst in all respects, thus tradeoffs and priorities are needed to balance the conflicting objectives such as energy security, sustainability and risk aversion to support rationale decision making. - Highlights: • Accident risks are compared across a broad range of energy technologies. • Analysis of historical experience was based on the

  15. Introduction to the risk assessment workshop on indoor air quality

    International Nuclear Information System (INIS)

    Oezkaynak, H.; Spengler, J.D.

    1990-01-01

    Due to the emerging importance of the indoor air-quality problem and associated health risk concerns, on December 6-8, 1988 a three-day workshop on indoor air-quality risk assessment was jointly organized by Harvard University, Energy and Environmental Policy Center, and the Harvard School of Public Health. This introduction briefly summarizes the objectives of the workshop and its agenda. The workshop consisted of presentations and discussions by researchers from academic, government, and private institutions. Among the participants were those who have been involved in the design of major field studies of human exposure, physicians and toxicologists involved in clinical studies, human exposure modelers, and epidemiologists and health risk assessors. The overall objective of the workshop was to examine the critical elements needed to perform risk assessments on major indoor air pollutants. Eight pollutants were chosen for discussion: environmental tobacco smoke, formaldehyde, radon, volatile organic compounds, biologicals, man-made mineral fibers, nitrogen dioxide, and semivolatile organic compounds. Twenty-two papers were presented in the workshop. Eight of these papers are published in this issue of Risk Analysis. Nine of the remaining fourteen will shortly be published in the 'Exposure Assessment Section' issue of the Journal of Toxicology and Industrial Health

  16. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  17. Risk assessment of complex accident scenarios

    International Nuclear Information System (INIS)

    Kluegel, Jens-Uwe

    2012-01-01

    The use of methods of risk assessment in accidents in nuclear plants is based on an old tradition. The first consistent systematic study is considered to be the Rasmussen Study of the U.S. Nuclear Regulatory Commission, NRC, WASH-1400. Above and beyond the realm of nuclear technology, there is an extensive range of accident, risk and reliability research into technical-administrative systems. In the past, it has been this area of research which has led to the development of concepts of safety precautions of the type also introduced into nuclear technology (barrier concept, defense in depth, single-failure criterion), where they are now taken for granted as trivial concepts. Also for risk analysis, nuclear technology made use of methods (such as event and fault tree analyses) whose origins were outside the nuclear field. One area in which the use of traditional methods of probabilistic safety analysis is encountering practical problems is risk assessment of complex accident scenarios in nuclear technology. A definition is offered of the term 'complex accident scenarios' in nuclear technology. A number of problems are addressed which arise in the use of traditional PSA procedures in risk assessment of complex accident scenarios. Cases of complex accident scenarios are presented to demonstrate methods of risk assessment which allow robust results to be obtained even when traditional techniques of risk analysis are maintained as a matter of principle. These methods are based on the use of conditional risk metrics. (orig.)

  18. Aquatic Macrophyte Risk Assessment for Pesticides

    NARCIS (Netherlands)

    Maltby, L.; Arnold, D.; Arts, G.H.P.; Davies, J.; Heimbach, F.; Pickl, C.; Poulsen, V.

    2009-01-01

    Given the essential role that primary producers play in aquatic ecosystems, it is imperative that the potential risk of pesticides to the structure and functioning of aquatic plants is adequately assessed. This book discusses the assessment of the risk of pesticides with herbicidal activity to

  19. Contrasting safety assessments of a runway incursion scenario: Event sequence analysis versus multi-agent dynamic risk modelling

    International Nuclear Information System (INIS)

    Stroeve, Sybert H.; Blom, Henk A.P.; Bakker, G.J.

    2013-01-01

    In the safety literature it has been argued, that in a complex socio-technical system safety cannot be well analysed by event sequence based approaches, but requires to capture the complex interactions and performance variability of the socio-technical system. In order to evaluate the quantitative and practical consequences of these arguments, this study compares two approaches to assess accident risk of an example safety critical sociotechnical system. It contrasts an event sequence based assessment with a multi-agent dynamic risk model (MA-DRM) based assessment, both of which are performed for a particular runway incursion scenario. The event sequence analysis uses the well-known event tree modelling formalism and the MA-DRM based approach combines agent based modelling, hybrid Petri nets and rare event Monte Carlo simulation. The comparison addresses qualitative and quantitative differences in the methods, attained risk levels, and in the prime factors influencing the safety of the operation. The assessments show considerable differences in the accident risk implications of the performance of human operators and technical systems in the runway incursion scenario. In contrast with the event sequence based results, the MA-DRM based results show that the accident risk is not manifest from the performance of and relations between individual human operators and technical systems. Instead, the safety risk emerges from the totality of the performance and interactions in the agent based model of the safety critical operation considered, which coincides very well with the argumentation in the safety literature.

  20. Risk assessment and risk transfer from an insurerś point of view

    Science.gov (United States)

    Ebner, G.

    2009-04-01

    Risk, a word that causes a lot of associations in human brains. Many of us don't like risks. Since hundreds of years insurance is the most common way to get rid of the financial consequences when risks convert to damages. This article deals with commercial risks and the possibilities of risk transfer, an important task within the field of risk management. For commercial entities it is very important to transfer risks, threatening the competitiveness or even worse the existence of a company. At the beginning of insurance it was more the less a bet between merchants and rich people. Later on mutual societies were taking place. Today we see a complex insurance industry with insurers, reinsurers, self insuring possibilities via captives and much more. This complex system, with all the different ways to deal with risk transfer requires a professional risk assessment! Risk assessment is based on knowledge about the threatened assets, the likelihood that they will be damaged, the threats and the possibilities to protect these assets. Assets may be tangible or intangible. Assessing risks is not a precise calculation that delivers a result without any doubt. But insurers and insured need a basis to fix a premium, both of them can agree. This contribution will present a system to assess risks and to find the right risk-transfer-premiums.

  1. Risk assessment and nuclear power

    International Nuclear Information System (INIS)

    Bodansky, D.

    1982-01-01

    The range of risk perceptions involving nuclear power is so great that there is little hope of bridging extreme positions, but a consensus based upon reasoned discussion among uncommitted people could determine a sensible path. Our concerns over the uncertainties of risk assessment have made it increasingly difficult to make responsible decisions fast enough to deal with modern needs. The result is an immobility in energy matters that can point to a 2% reduction in oil use as its only triumph. The risk of nuclear war as a result of military action over energy issues suggests to some that the solution is to abolish nuclear power (however impractical) and to others that a rapid spread of nuclear power will eliminate energy as an incentive for war. If nuclear war is the major risk to consider, risk assessments need to include the risks of war, as well as those of carbon dioxide buildup and socio-economic disruptions, all of which loom larger than the risks of nuclear-plant accidents. Energy choices should be aimed at diminishing these major risks, even if they include the use of nuclear power. 26 references

  2. RISK-ASSESSMENT PROCEDURES AND ESTABLISHING THE SIZE OF SAMPLES FOR AUDITING FINANCIAL STATEMENTS

    Directory of Open Access Journals (Sweden)

    Daniel Botez

    2014-12-01

    Full Text Available In auditing financial statements, the procedures for the assessment of the risks and the calculation of the materiality differ from an auditor to another, by audit cabinet policy or advice professional bodies. All, however, have the reference International Audit Standards ISA 315 “Identifying and assessing the risks of material misstatement through understanding the entity and its environment” and ISA 320 “Materiality in planning and performing an audit”. On the basis of specific practices auditors in Romania, the article shows some laborious and examples of these aspects. Such considerations are presented evaluation of the general inherent risk, a specific inherent risk, the risk of control and the calculation of the materiality.

  3. Risk Assessment of Genetically Modified Microorganisms

    DEFF Research Database (Denmark)

    Jacobsen, B. L.; Wilcks, Andrea

    2001-01-01

    the industry, national administration and research institutions were gathered to discuss which elements should be considered in a risk assessment of genetically modified microorganisms used as food or food ingredients. The existing EU and national regulations were presented, together with the experiences......The rapid development of recombinant DNA techniques for food organisms urges for an ongoing discussion on the risk assessment of both new as traditional use of microorganisms in food production. This report, supported by the Nordic Council of Ministers, is the result of a workshop where people from...... with risk assessment of these organisms in each Nordic country....

  4. Dose related risk and effect assessment model (DREAM) -- A more realistic approach to risk assessment of offshore discharges

    International Nuclear Information System (INIS)

    Johnsen, S.; Furuholt, E.

    1995-01-01

    Risk assessment of discharges from offshore oil and gas production to the marine environment features determination of potential environmental concentration (PEC) levels and no observed effect concentration (NOEC) levels. The PEC values are normally based on dilution of chemical components in the actual discharge source in the recipient, while the NOEC values are determined by applying a safety factor to acute toxic effects from laboratory tests. The DREAM concept focuses on realistic exposure doses as function of contact time and dilution, rather than fixed exposure concentrations of chemicals in long time exposure regimes. In its present state, the DREAM model is based on a number of assumptions with respect to the link between real life exposure doses and effects observed in laboratory tests. A research project has recently been initiated to develop the concept further, with special focus on chronic effects of different chemical compounds on the marine ecosystem. One of the questions that will be addressed is the link between exposure time, dose, concentration and effect. Validation of the safety factors applied for transforming acute toxic data into NOEC values will also be included. The DREAM model has been used by Statoil for risk assessment of discharges from new and existing offshore oil and gas production fields, and has been found to give a much more realistic results than conventional risk assessment tools. The presentation outlines the background for the DREAM approach, describes the model in its present state, discusses further developments and applications, and shows a number of examples on the performance of DREAM

  5. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  6. Environmental risk assessments for transgenic crops producing output trait enzymes

    Science.gov (United States)

    Tuttle, Ann; Shore, Scott; Stone, Terry

    2009-01-01

    The environmental risks from cultivating crops producing output trait enzymes can be rigorously assessed by testing conservative risk hypotheses of no harm to endpoints such as the abundance of wildlife, crop yield and the rate of degradation of crop residues in soil. These hypotheses can be tested with data from many sources, including evaluations of the agronomic performance and nutritional quality of the crop made during product development, and information from the scientific literature on the mode-of-action, taxonomic distribution and environmental fate of the enzyme. Few, if any, specific ecotoxicology or environmental fate studies are needed. The effective use of existing data means that regulatory decision-making, to which an environmental risk assessment provides essential information, is not unnecessarily complicated by evaluation of large amounts of new data that provide negligible improvement in the characterization of risk, and that may delay environmental benefits offered by transgenic crops containing output trait enzymes. PMID:19924556

  7. Assessment of technical risks and R and D requirements for a magnetic confinement fusion fuel system. Final report

    International Nuclear Information System (INIS)

    DeFreece, D.A.

    1983-11-01

    This report documents a specific use and results of a novel technique for assessing the technical risks associated with the hardware development of a possible future commercial fusion power plant fuel system. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications. A technical risk assessment is the quantification of this risk. This Technical Risk Assessment (TRA) methodology was applied to a deuterium-tritium fuel system for a magnetic-confinement fusion power plant. The fuel system is defined to support a generic commercial reactor with at least two viable options for each critical subsystem. Each subsystem option is defined in detail including nominal performance requirements and subsystem interfaces. Subsystem experts were canvassed to obtain values for past, present and future technical performance parameters for each of the subsystem options. These forecasts are presented as probabilities of achieving given levels of performance in specific time periods for assumed funding scenarios. Several funding scenarios were examined to discern whether performance limitations are caused by funding or technology. A computerized Fuel System simulation is described which uses these subsystem performance parameter forecasts as inputs

  8. Coverage of endangered species in environmental risk assessments at EFSA

    NARCIS (Netherlands)

    Brock, T.C.M.

    2016-01-01

    The EFSA performs environmental risk assessment (ERA) for single potential stressors such as plant protection products, genetically modified organisms and feed additives, and for invasive alien species that are harmful to plant health. This ERA focusses primarily on the use or spread of such

  9. INCORPORATING NONCHEMICAL STRESSORS INTO CUMMULATIVE RISK ASSESSMENTS

    Science.gov (United States)

    The risk assessment paradigm has begun to shift from assessing single chemicals using "reasonable worst case" assumptions for individuals to considering multiple chemicals and community-based models. Inherent in community-based risk assessment is examination of all stressors a...

  10. Process of performance assessment

    International Nuclear Information System (INIS)

    King, C.M.; Halford, D.K.

    1987-01-01

    Performance assessment is the process used to evaluate the environmental consequences of disposal of radioactive waste in the biosphere. An introductory review of the subject is presented. Emphasis is placed on the process of performance assessment from the standpoint of defining the process. Performance assessment, from evolving experience at DOE sites, has short-term and long-term subprograms, the components of which are discussed. The role of mathematical modeling in performance assessment is addressed including the pros and cons of current approaches. Finally, the system/site/technology issues as the focal point of this symposium are reviewed

  11. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    International Nuclear Information System (INIS)

    Collins, John W.

    2011-01-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  12. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    John W. Collins

    2011-09-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  13. Approaches to risk assessment in food allergy

    DEFF Research Database (Denmark)

    Madsen, Charlotte Bernhard; Hattersley, S.; Buck, J.

    2009-01-01

    modelling is considered to be the most promising approach for use in population risk assessment (which is a particular focus for risk managers). For all approaches, further improvement of input data is desirable, particularly data on consumption patterns/food choices in food allergic consumers, data...... models. The workshop concluded that all the three approaches to safety and risk assessment of allergenic foods should continue to be considered. A particular strength of the MoE and probabilistic approaches is that they do not rely on low-dose extrapolations with its inherent issues. Probabilistic......A workshop was organised to investigate whether risk assessment strategies and methodologies used in classical/conventional toxicology may be used for risk assessment of allergenic foods. to discuss the advantages and limitations of different approaches and to determine the research needed to move...

  14. NRC performance assessment program

    International Nuclear Information System (INIS)

    Coplan, S.M.

    1986-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) performance assessment program includes the development of guidance to the U.S. Department of Energy (DOE) on preparation of a license application and on conducting the studies to support a license application. The nature of the licensing requirements of 10 CFR Part 60 create a need for performance assessments by the DOE. The NRC and DOE staffs each have specific roles in assuring the adequacy of those assessments. Performance allocation is an approach for determining what testing and analysis will be needed during site characterization to assure that an adequate data base is available to support the necessary performance assessments. From the standpoint of establishing is implementable methodology, the most challenging performance assessment needed for licensing is the one that will be used to determine compliance with the U.S. Environmental Protection Agency's (EPA) containment requirement

  15. Characterizing and Measuring Maliciousness for Cybersecurity Risk Assessment

    Directory of Open Access Journals (Sweden)

    Zoe M. King

    2018-02-01

    Full Text Available Cyber attacks have been increasingly detrimental to networks, systems, and users, and are increasing in number and severity globally. To better predict system vulnerabilities, cybersecurity researchers are developing new and more holistic approaches to characterizing cybersecurity system risk. The process must include characterizing the human factors that contribute to cyber security vulnerabilities and risk. Rationality, expertise, and maliciousness are key human characteristics influencing cyber risk within this context, yet maliciousness is poorly characterized in the literature. There is a clear absence of literature pertaining to human factor maliciousness as it relates to cybersecurity and only limited literature relating to aspects of maliciousness in other disciplinary literatures, such as psychology, sociology, and law. In an attempt to characterize human factors as a contribution to cybersecurity risk, the Cybersecurity Collaborative Research Alliance (CSec-CRA has developed a Human Factors risk framework. This framework identifies the characteristics of an attacker, user, or defender, all of whom may be adding to or mitigating against cyber risk. The maliciousness literature and the proposed maliciousness assessment metrics are discussed within the context of the Human Factors Framework and Ontology. Maliciousness is defined as the intent to harm. Most maliciousness cyber research to date has focused on detecting malicious software but fails to analyze an individual’s intent to do harm to others by deploying malware or performing malicious attacks. Recent efforts to identify malicious human behavior as it relates to cybersecurity, include analyzing motives driving insider threats as well as user profiling analyses. However, cyber-related maliciousness is neither well-studied nor is it well understood because individuals are not forced to expose their true selves to others while performing malicious attacks. Given the difficulty of

  16. Characterizing and Measuring Maliciousness for Cybersecurity Risk Assessment.

    Science.gov (United States)

    King, Zoe M; Henshel, Diane S; Flora, Liberty; Cains, Mariana G; Hoffman, Blaine; Sample, Char

    2018-01-01

    Cyber attacks have been increasingly detrimental to networks, systems, and users, and are increasing in number and severity globally. To better predict system vulnerabilities, cybersecurity researchers are developing new and more holistic approaches to characterizing cybersecurity system risk. The process must include characterizing the human factors that contribute to cyber security vulnerabilities and risk. Rationality, expertise, and maliciousness are key human characteristics influencing cyber risk within this context, yet maliciousness is poorly characterized in the literature. There is a clear absence of literature pertaining to human factor maliciousness as it relates to cybersecurity and only limited literature relating to aspects of maliciousness in other disciplinary literatures, such as psychology, sociology, and law. In an attempt to characterize human factors as a contribution to cybersecurity risk, the Cybersecurity Collaborative Research Alliance (CSec-CRA) has developed a Human Factors risk framework. This framework identifies the characteristics of an attacker, user, or defender, all of whom may be adding to or mitigating against cyber risk. The maliciousness literature and the proposed maliciousness assessment metrics are discussed within the context of the Human Factors Framework and Ontology. Maliciousness is defined as the intent to harm. Most maliciousness cyber research to date has focused on detecting malicious software but fails to analyze an individual's intent to do harm to others by deploying malware or performing malicious attacks. Recent efforts to identify malicious human behavior as it relates to cybersecurity, include analyzing motives driving insider threats as well as user profiling analyses. However, cyber-related maliciousness is neither well-studied nor is it well understood because individuals are not forced to expose their true selves to others while performing malicious attacks. Given the difficulty of interviewing malicious

  17. Characterizing and Measuring Maliciousness for Cybersecurity Risk Assessment

    Science.gov (United States)

    King, Zoe M.; Henshel, Diane S.; Flora, Liberty; Cains, Mariana G.; Hoffman, Blaine; Sample, Char

    2018-01-01

    Cyber attacks have been increasingly detrimental to networks, systems, and users, and are increasing in number and severity globally. To better predict system vulnerabilities, cybersecurity researchers are developing new and more holistic approaches to characterizing cybersecurity system risk. The process must include characterizing the human factors that contribute to cyber security vulnerabilities and risk. Rationality, expertise, and maliciousness are key human characteristics influencing cyber risk within this context, yet maliciousness is poorly characterized in the literature. There is a clear absence of literature pertaining to human factor maliciousness as it relates to cybersecurity and only limited literature relating to aspects of maliciousness in other disciplinary literatures, such as psychology, sociology, and law. In an attempt to characterize human factors as a contribution to cybersecurity risk, the Cybersecurity Collaborative Research Alliance (CSec-CRA) has developed a Human Factors risk framework. This framework identifies the characteristics of an attacker, user, or defender, all of whom may be adding to or mitigating against cyber risk. The maliciousness literature and the proposed maliciousness assessment metrics are discussed within the context of the Human Factors Framework and Ontology. Maliciousness is defined as the intent to harm. Most maliciousness cyber research to date has focused on detecting malicious software but fails to analyze an individual’s intent to do harm to others by deploying malware or performing malicious attacks. Recent efforts to identify malicious human behavior as it relates to cybersecurity, include analyzing motives driving insider threats as well as user profiling analyses. However, cyber-related maliciousness is neither well-studied nor is it well understood because individuals are not forced to expose their true selves to others while performing malicious attacks. Given the difficulty of interviewing

  18. Engineering Risk Assessment of Space Thruster Challenge Problem

    Science.gov (United States)

    Mathias, Donovan L.; Mattenberger, Christopher J.; Go, Susie

    2014-01-01

    The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

  19. Uncertainty characterization approaches for risk assessment of DBPs in drinking water: a review.

    Science.gov (United States)

    Chowdhury, Shakhawat; Champagne, Pascale; McLellan, P James

    2009-04-01

    The management of risk from disinfection by-products (DBPs) in drinking water has become a critical issue over the last three decades. The areas of concern for risk management studies include (i) human health risk from DBPs, (ii) disinfection performance, (iii) technical feasibility (maintenance, management and operation) of treatment and disinfection approaches, and (iv) cost. Human health risk assessment is typically considered to be the most important phase of the risk-based decision-making or risk management studies. The factors associated with health risk assessment and other attributes are generally prone to considerable uncertainty. Probabilistic and non-probabilistic approaches have both been employed to characterize uncertainties associated with risk assessment. The probabilistic approaches include sampling-based methods (typically Monte Carlo simulation and stratified sampling) and asymptotic (approximate) reliability analysis (first- and second-order reliability methods). Non-probabilistic approaches include interval analysis, fuzzy set theory and possibility theory. However, it is generally accepted that no single method is suitable for the entire spectrum of problems encountered in uncertainty analyses for risk assessment. Each method has its own set of advantages and limitations. In this paper, the feasibility and limitations of different uncertainty analysis approaches are outlined for risk management studies of drinking water supply systems. The findings assist in the selection of suitable approaches for uncertainty analysis in risk management studies associated with DBPs and human health risk.

  20. Health risk assessment of groundwater arsenic pollution in southern Taiwan.

    Science.gov (United States)

    Liang, Ching-Ping; Wang, Sheng-Wei; Kao, Yu-Hsuan; Chen, Jui-Sheng

    2016-12-01

    Residents of the Pingtung Plain, Taiwan, use groundwater for drinking. However, monitoring results showed that a considerable portion of groundwater has an As concentration higher than the safe drinking water regulation of 10 μg/L. Considering residents of the Pingtung Plain continue to use groundwater for drinking, this study attempted to evaluate the exposure and health risk from drinking groundwater. The health risk from drinking groundwater was evaluated based on the hazard quotient (HQ) and target risk (TR) established by the US Environmental Protection Agency. The results showed that the 95th percentile of HQ exceeded 1 and TR was above the safe value of threshold value of 10 -6 . To illustrate significant variability of the drinking water consumption rate and body weight of each individual, health risk assessments were also performed using a spectrum of daily water intake rate and body weight to reasonably and conservatively assess the exposure and health risk for the specific subgroups of population of the Pingtung Plain. The assessment results showed that 0.01-7.50 % of the population's HQ levels are higher than 1 and as much as 77.7-93.3 % of the population being in high cancer risk category and having a TR value >10 -6 . The TR estimation results implied that groundwater use for drinking purpose places people at risk of As exposure. The government must make great efforts to provide safe drinking water for residents of the Pingtung Plain.

  1. Analysis of existing risk assessments, and list of suggestions

    CERN Document Server

    Heimsch, Laura

    2016-01-01

    The scope of this project was to analyse risk assessments made at CERN and extracting some crucial information about the different methodologies used, profiles of people who make the risk assessments, and gathering information of whether the risk matrix was used and if the acceptable level of risk was defined. Second step of the project was to trigger discussion inside HSE about risk assessment by suggesting a risk matrix and a risk assessment template.

  2. Effectively managing nuclear risk through human performance improvement

    International Nuclear Information System (INIS)

    Coe, R.P.

    2004-01-01

    is to apply the principles of Human Performance Technology, or HPT, to the nuclear workplace. HPT is a relatively new field that has been emerging over the several decades. Its principles are derived from the research and practice of behavioral and cognitive psychologist, instructional technologists training designers, organizational developers and various human resource specialists. Relying heavily on general systems theory as applied to organizations, HPT takes a systemic approach to risk assessment and performance analysis/ change as opposed to making piecemeal interventions which often happens in designing training programs intended to be the only fix specific organizational behavior problems in the short term. Specifically, HPT methodology emphasizes examining any given problem in relation to the more global aims of the setting or environment within which the problem is identified. Its consistent driver is measurable performance and the structuring of elements within the system to improve and reward desirable performance and effective risk management. In general, HPT is more than another way to look at training, HPT is a systemized process that combines selection, analysis, design, development, implementation, and evaluation of programs to most cost effectively influence human behavior and accomplishment. By taking a systems view of organizations rather than discreetly focusing on pockets of concern within an organization, it seeks to link the actions and interventions of all the organizational elements that affect overall performance. It does this through identifying, among other things, current performance levels, required performance levels for effective risk management, exemplary performance, and developing measurements for each step in the process. It examines such things as the external and organizational environments as well as the influences that directly impact individual performance. Direct application to the nuclear industry is evident when

  3. Risk monitor-a tool for computer aided risk assessment for NPPs

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Kushwaha, H.S.; Hadap, Nikhil

    2001-01-01

    Considerable changes occur in components status and system design and subsequent operation due to changes in plant configuration and their operating procedures. These changes are organised because some components are randomly down and other can be planned for test, maintenance and repair. This results in a fluctuation of risk level over operating time, which is termed as risk profile. Probabilistic Safety Assessment (PSA) is an analytical technique for assessing the risk by integrating diverse aspects of design and operation of a Nuclear Power Plant. Risk can be defined as the product of the probability of an accident and the consequences from that accident. Reactor Safety Division of BARC has developed PC based tool, which can assess the risk profile. This package can be used to optimise the operation in Nuclear Power Plants with respect to a minimum risk level over the operating time, and is termed as Risk Monitor. Risk Monitor is user friendly and can re-evaluate core damage frequency for changes in component status, test interval, initiating event frequency etc. Plant restoration advice, when the plant is in high risk configuration, current status of all plant equipment, and equipment prioritization are also provided by the package. (author)

  4. Patient satisfaction with a chronic kidney disease risk assessment service in community pharmacies.

    Science.gov (United States)

    Gheewala, Pankti A; Peterson, Gregory M; Zaidi, Syed Tabish R; Jose, Matthew D; Castelino, Ronald L

    2018-04-01

    Patient satisfaction is an important determinant of the feasibility and sustainability of community pharmacy screening services. However, few studies have evaluated this, with no such study performed for a chronic kidney disease risk assessment service. The aim was to determine patient satisfaction with a chronic kidney disease risk assessment service performed in community pharmacies. Community pharmacies in the state of Tasmania, Australia. An anonymous nine-item satisfaction survey, with Likert-type scales, was developed following a literature review of existing surveys. Reliability of the nine-item scale was determined using Cronbach's alpha. Patients were asked an additional question on willingness to pay, with choices of amount from $5 to $25. The satisfaction survey was mailed to 389 patients who participated in the chronic kidney disease risk assessment study. Patient level of satisfaction with and willingness to pay for the chronic kidney disease service. Responses from 143 participants were included in the final analysis. Cronbach's alpha for the nine-item satisfaction scale was 0.87. The majority of participants agreed that the time required to undergo the risk assessment process was justified (90.2%); overall, they were satisfied with the chronic kidney disease risk assessment service (90.0%) and they felt comfortable with the pharmacist referring their results to their doctor (88.9%). Of 136 participants who answered the question on willingness to pay, 62.9% indicated that they would pay for the chronic kidney disease service. Of these, 29.2, 25.8 and 19.1% were willing to pay $20, $10 and $5, respectively. Patient satisfaction with the community pharmacy-based chronic kidney disease risk assessment was high. These findings provide support for the implementation of the service within community pharmacy practice.

  5. Surgery Risk Assessment (SRA) Database

    Data.gov (United States)

    Department of Veterans Affairs — The Surgery Risk Assessment (SRA) database is part of the VA Surgical Quality Improvement Program (VASQIP). This database contains assessments of selected surgical...

  6. Cultural heuristics in risk assessment of HIV/AIDS

    NARCIS (Netherlands)

    Bailey, A.; Hutter, I.

    2006-01-01

    Behaviour change models in HIV prevention tend to consider that risky sexual behaviours reflect risk assessments and that by changing risk assessments behaviour can be changed. Risk assessment is however culturally constructed. Individuals use heuristics or bounded cognitive devices derived from

  7. Qualitative risk assessment for 100-DR-1 source operable unit

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.M.

    1994-01-01

    The Washington State Department of Ecology (Ecology), the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE), signatories to the Hanford Federal Facility Agreement and Consent Order have developed the Hanford site Past-Practice Strategy to emphasize initiating and completing waste site cleanups with a bias for action. This strategy relies, in part, upon the use of a qualitative risk assessment (QRA) to assist in decision-making. The QRA is performed using the Hanford Site Baseline Risk Assessment Methodology (HSBRAM) as guidance (DOE-RL 1993a). The results will be used, along with other considerations, to make a recommendation for or against an interim remedial measure (IRM) at each high-priority waste site. The objective of conducting IRMs at Hanford, is to achieve cleanup and reduce risk in the shortest time possible and in a cost effective manner

  8. Bilateral mammographic density asymmetry and breast cancer risk: A preliminary assessment

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, Bin, E-mail: zhengb@upmc.edu [Department of Radiology, University of Pittsburgh, 3362 Fifth Ave, Pittsburgh, PA 15213 (United States); Sumkin, Jules H., E-mail: jsumkin@mail.magee.edu [Department of Radiology, Magee Womens Hospital, 300 Halket Street, Pittsburgh, PA 15213 (United States); Zuley, Margarita L., E-mail: zuleyml@upmc.edu [Department of Radiology, Magee Womens Hospital, 300 Halket Street, Pittsburgh, PA 15213 (United States); Wang, Xingwei, E-mail: wangx6@upmc.edu [Department of Radiology, University of Pittsburgh, 3362 Fifth Ave, Pittsburgh, PA 15213 (United States); Klym, Amy H., E-mail: klymah@upmc.edu [Department of Radiology, University of Pittsburgh, 3362 Fifth Ave, Pittsburgh, PA 15213 (United States); Gur, David, E-mail: gurd@upmc.edu [Department of Radiology, University of Pittsburgh, 3362 Fifth Ave, Pittsburgh, PA 15213 (United States)

    2012-11-15

    To improve efficacy of breast cancer screening and prevention programs, it requires a risk assessment model with high discriminatory power. This study aimed to assess classification performance of using computed bilateral mammographic density asymmetry to predict risk of individual women developing breast cancer in near-term. The database includes 451 cases with multiple screening mammography examinations. The first (baseline) examinations of all case were interpreted negative. In the next sequential examinations, 187 cases developed cancer or surgically excised high-risk lesions, 155 remained negative (not-recalled), and 109 were recalled benign cases. From each of two bilateral cranio-caudal view images acquired from the baseline examination, we computed two features of average pixel value and local pixel value fluctuation. We then computed mean and difference of each feature computed from two images. When applying the computed features and other two risk factors (woman's age and subjectively rated mammographic density) to predict risk of cancer development, areas under receiver operating characteristic curves (AUC) were computed to evaluate the discriminatory/classification performance. The AUCs are 0.633 {+-} 0.030, 0.535 {+-} 0.036, 0.567 {+-} 0.031, and 0.719 {+-} 0.027 when using woman's age, subjectively rated, computed mean and asymmetry of mammographic density, to classify between two groups of cancer-verified and negative cases, respectively. When using an equal-weighted fusion method to combine woman's age and computed density asymmetry, AUC increased to 0.761 {+-} 0.025 (p < 0.05). The study demonstrated that bilateral mammographic density asymmetry could be a significantly stronger risk factor associated to the risk of women developing breast cancer in near-term than woman's age and assessed mean mammographic density.

  9. Bilateral mammographic density asymmetry and breast cancer risk: A preliminary assessment

    International Nuclear Information System (INIS)

    Zheng, Bin; Sumkin, Jules H.; Zuley, Margarita L.; Wang, Xingwei; Klym, Amy H.; Gur, David

    2012-01-01

    To improve efficacy of breast cancer screening and prevention programs, it requires a risk assessment model with high discriminatory power. This study aimed to assess classification performance of using computed bilateral mammographic density asymmetry to predict risk of individual women developing breast cancer in near-term. The database includes 451 cases with multiple screening mammography examinations. The first (baseline) examinations of all case were interpreted negative. In the next sequential examinations, 187 cases developed cancer or surgically excised high-risk lesions, 155 remained negative (not-recalled), and 109 were recalled benign cases. From each of two bilateral cranio-caudal view images acquired from the baseline examination, we computed two features of average pixel value and local pixel value fluctuation. We then computed mean and difference of each feature computed from two images. When applying the computed features and other two risk factors (woman's age and subjectively rated mammographic density) to predict risk of cancer development, areas under receiver operating characteristic curves (AUC) were computed to evaluate the discriminatory/classification performance. The AUCs are 0.633 ± 0.030, 0.535 ± 0.036, 0.567 ± 0.031, and 0.719 ± 0.027 when using woman's age, subjectively rated, computed mean and asymmetry of mammographic density, to classify between two groups of cancer-verified and negative cases, respectively. When using an equal-weighted fusion method to combine woman's age and computed density asymmetry, AUC increased to 0.761 ± 0.025 (p < 0.05). The study demonstrated that bilateral mammographic density asymmetry could be a significantly stronger risk factor associated to the risk of women developing breast cancer in near-term than woman's age and assessed mean mammographic density.

  10. Defining Probability in Sex Offender Risk Assessment.

    Science.gov (United States)

    Elwood, Richard W

    2016-12-01

    There is ongoing debate and confusion over using actuarial scales to predict individuals' risk of sexual recidivism. Much of the debate comes from not distinguishing Frequentist from Bayesian definitions of probability. Much of the confusion comes from applying Frequentist probability to individuals' risk. By definition, only Bayesian probability can be applied to the single case. The Bayesian concept of probability resolves most of the confusion and much of the debate in sex offender risk assessment. Although Bayesian probability is well accepted in risk assessment generally, it has not been widely used to assess the risk of sex offenders. I review the two concepts of probability and show how the Bayesian view alone provides a coherent scheme to conceptualize individuals' risk of sexual recidivism.

  11. Completion of risk assessment and monitoring within forensic psychiatry.

    Science.gov (United States)

    Galappathie, Nuwan; Heeramun, Ragini; Jethwa, Krishma

    2009-04-01

    There is a clear need for high standards of risk assessment and monitoring within forensic psychiatry. This has been highlighted by a number of high profile homicide enquires which have called for better standards of multidisciplinary risk assessment and monitoring. There are no national standards for risk assessment. We conducted a study to audit electronically the completion rate of a service-designed risk assessment document within Fromside, a medium secure unit in the UK. The completion rates for key sections of 64 risk assessment documents were assessed. Only 48 of the 64 (75%) documents were electronically available. The completion rates ranged from 59/64 (92%) for the retrospective risk review to 46/64 (72%) for relapse indicators. Only 35/64 (55%) risk documents were updated within the last three months. We found that the use of risk profile documents has helped achieve good standards of risk assessment, however greater priority needs to be given to ongoing monitoring. We recommend that consideration is given to the development of national guidelines for multidisciplinary risk assessment and monitoring.

  12. Quantifying risk and accuracy in cancer risk assessment: the process and its role in risk