WorldWideScience

Sample records for perform indexing maintenance

  1. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  2. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  3. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  4. Nutritional Status of Maintenance Dialysis Patients: Low Lean Body Mass Index and Obesity Are Common, Protein-Energy Wasting Is Uncommon.

    Directory of Open Access Journals (Sweden)

    Mette Koefoed

    Full Text Available Maintenance dialysis patients are at increased risk of abnormal nutritional status due to numerous causative factors, both nutritional and non-nutritional. The present study assessed the current prevalence of protein-energy wasting, low lean body mass index and obesity in maintenance dialysis patients, and compared different methods of nutritional assessment.In a cross-sectional study conducted in 2014 at Roskilde Hospital, Denmark, we performed anthropometry (body weight, skinfolds, mid-arm, waist, and hip circumferences, and determined plasma albumin and normalized protein catabolic rate in order to assess the prevalence of protein-energy wasting, low lean body mass index and obesity in these patients.Seventy-nine eligible maintenance dialysis patients participated. The prevalence of protein-energy wasted patients was 4% (95% CI: 2-12 as assessed by the coexistence of low lean body mass index and low fat mass index. Low lean body mass index was seen in 32% (95% CI: 22-44. Obesity prevalence as assessed from fat mass index was 43% (95% CI: 32-55. Coexistence of low lean body mass index and obesity was seen in 10% (95% CI: 5-19. The prevalence of protein-energy wasting and obesity varied considerably, depending on nutritional assessment methodology.Our data indicate that protein-energy wasting is uncommon, whereas low lean body mass index and obesity are frequent conditions among patients in maintenance dialysis. A focus on how to increase and preserve lean body mass in dialysis patients is suggested in the future. In order to clearly distinguish between shortage, sufficiency and abundance of protein and/or fat deposits in maintenance dialysis patients, we suggest the simple measurements of lean body mass index and fat mass index.

  5. Nutritional Status of Maintenance Dialysis Patients: Low Lean Body Mass Index and Obesity Are Common, Protein-Energy Wasting Is Uncommon.

    Science.gov (United States)

    Koefoed, Mette; Kromann, Charles Boy; Juliussen, Sophie Ryberg; Hvidtfeldt, Danni; Ekelund, Bo; Frandsen, Niels Erik; Marckmann, Peter

    2016-01-01

    Maintenance dialysis patients are at increased risk of abnormal nutritional status due to numerous causative factors, both nutritional and non-nutritional. The present study assessed the current prevalence of protein-energy wasting, low lean body mass index and obesity in maintenance dialysis patients, and compared different methods of nutritional assessment. In a cross-sectional study conducted in 2014 at Roskilde Hospital, Denmark, we performed anthropometry (body weight, skinfolds, mid-arm, waist, and hip circumferences), and determined plasma albumin and normalized protein catabolic rate in order to assess the prevalence of protein-energy wasting, low lean body mass index and obesity in these patients. Seventy-nine eligible maintenance dialysis patients participated. The prevalence of protein-energy wasted patients was 4% (95% CI: 2-12) as assessed by the coexistence of low lean body mass index and low fat mass index. Low lean body mass index was seen in 32% (95% CI: 22-44). Obesity prevalence as assessed from fat mass index was 43% (95% CI: 32-55). Coexistence of low lean body mass index and obesity was seen in 10% (95% CI: 5-19). The prevalence of protein-energy wasting and obesity varied considerably, depending on nutritional assessment methodology. Our data indicate that protein-energy wasting is uncommon, whereas low lean body mass index and obesity are frequent conditions among patients in maintenance dialysis. A focus on how to increase and preserve lean body mass in dialysis patients is suggested in the future. In order to clearly distinguish between shortage, sufficiency and abundance of protein and/or fat deposits in maintenance dialysis patients, we suggest the simple measurements of lean body mass index and fat mass index.

  6. Development of maintenance composite priority index for buildings in Palestine: A pilot case study

    Science.gov (United States)

    Issa, Amjad; Awad, Riyad

    2017-11-01

    The current building maintenance practices in Palestine are not based on scientific systematic methods. Most of the municipalities use one criterion to define the maintenance priorities, which is the "worst-first" criterion. Therefore, the current practices in defining buildings maintenance plans are not dealing with the known phases that are generally followed, including those in establishing building inventories, building condition survey, detailed visual inspection, identification of the proper maintenance and rehabilitation measures, and setting priorities. Accordingly, the recent preparation of the Operation and Maintenance (O&M) Manual for Palestinian municipalities is an important step to guide them towards preparing and implementing their O&M priority-based plans, considering scare resources. During the course of preparation of the Manual, the proposed procedures were applied at ten pilot municipalities. This study aims to explore the outcome of the implementation of the 2014/2015 O&M buildings maintenance priorities at these municipalities through the development of maintenance composite priority index (PI). The new proposed priority index is a scientific tool that will identify the priority of maintenance buildings through using a systematic procedure instead of first worst one. To achieve this, analyses of the outcome of a questionnaire designed to collect relevant information from these municipalities was conducted. The maintenance priority index for buildings is calculated considering different indicators among them building status (condition), classification and importance of the building, number of beneficiaries (users), safety aspects (severity level in the building), and people complaints. The main component of the PI is the building condition index (BCI) which forms about 40% of the total weight. The physical inspection, which is the main input for calculating the BCI, is conducted on two levels; the primary level, and the secondary level. The

  7. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  8. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  9. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  10. Knowledge-based machine indexing from natural language text: Knowledge base design, development, and maintenance

    Science.gov (United States)

    Genuardi, Michael T.

    1993-01-01

    One strategy for machine-aided indexing (MAI) is to provide a concept-level analysis of the textual elements of documents or document abstracts. In such systems, natural-language phrases are analyzed in order to identify and classify concepts related to a particular subject domain. The overall performance of these MAI systems is largely dependent on the quality and comprehensiveness of their knowledge bases. These knowledge bases function to (1) define the relations between a controlled indexing vocabulary and natural language expressions; (2) provide a simple mechanism for disambiguation and the determination of relevancy; and (3) allow the extension of concept-hierarchical structure to all elements of the knowledge file. After a brief description of the NASA Machine-Aided Indexing system, concerns related to the development and maintenance of MAI knowledge bases are discussed. Particular emphasis is given to statistically-based text analysis tools designed to aid the knowledge base developer. One such tool, the Knowledge Base Building (KBB) program, presents the domain expert with a well-filtered list of synonyms and conceptually-related phrases for each thesaurus concept. Another tool, the Knowledge Base Maintenance (KBM) program, functions to identify areas of the knowledge base affected by changes in the conceptual domain (for example, the addition of a new thesaurus term). An alternate use of the KBM as an aid in thesaurus construction is also discussed.

  11. Performance measures for world class maintenance

    International Nuclear Information System (INIS)

    Labib, A.W.

    1998-01-01

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a 'real time' environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs

  12. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A W [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1999-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  13. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A.W. [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1998-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  14. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  15. Maintenance Personnel Performance Simulation (MAPPS) model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.; Haas, P.M.

    1984-01-01

    A stochastic computer model for simulating the actions and behavior of nuclear power plant maintenance personnel is described. The model considers personnel, environmental, and motivational variables to yield predictions of maintenance performance quality and time to perform. The mode has been fully developed and sensitivity tested. Additional evaluation of the model is now taking place

  16. Cost savings from performance-based maintenance contracting

    NARCIS (Netherlands)

    Straub, A.

    2009-01-01

    New procurement approaches combined with performance-based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance-based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative,

  17. Evaluation of Road Performance Based on International Roughness Index and Falling Weight Deflectometer

    Science.gov (United States)

    Hasanuddin; Setyawan, A.; Yulianto, B.

    2018-03-01

    Assessment to the performance of road pavement is deemed necessary to improve the management quality of road maintenance and rehabilitation. This research to evaluate the road base on functional and structural and recommendations handling done. Assessing the pavement performance is conducted with functional and structural evaluation. Functional evaluation of pavement is based on the value of IRI (International Roughness Index) which among others is derived from reading NAASRA for analysis and recommended road handling. Meanwhile, structural evaluation of pavement is done by analyzing deflection value based on FWD (Falling Weight Deflectometer) data resulting in SN (Structural Number) value. The analysis will result in SN eff (Structural Number Effective) and SN f (Structural Number Future) value obtained from comparing SN eff to SN f value that leads to SCI (Structural Condition Index) value. SCI value implies the possible recommendation for handling pavement. The study done to Simpang Tuan-Batas Kota Jambi road segment was based on functional analysis. The study indicated that the road segment split into 12 segments in which segment 1, 3, 5, 7, 9, and 11 were of regular maintenance, segment 2, 4, 8, 10, 12 belonged to periodic maintenance, and segment 6 was of rehabilitation. The structural analysis resulted in 8 segments consisting of segment 1 and 2 recommended for regular maintenance, segment 3, 4, 5, and 7 for functional overlay, and 6 and 8 were of structural overlay.

  18. Comparative evaluation of maintenance performance using subsurvival functions

    DEFF Research Database (Denmark)

    Paulsen, J.L.; Cooke, R.; Nyman, R.

    1997-01-01

    Subsurvival functions are applied to operational data for the control rod drive systems of Nordic nuclear reactors to evaluate maintenance performance. Competing failure modes are preventive and corrective maintenance. Maintenance indicators are defined and evaluated for 8 plants. (C) 1997 Elsevier...

  19. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  20. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  1. Impact of weight loss and maintenance with ad libitum diets varying in protein and glycemic index content on metabolic syndrome

    DEFF Research Database (Denmark)

    Papadaki, Angeliki; Linardakis, Manolis; Plada, Maria

    2014-01-01

    We investigated the effects of weight loss and maintenance with diets that varied with regard to protein content and glycemic index (GI) on metabolic syndrome (MetSyn) status.......We investigated the effects of weight loss and maintenance with diets that varied with regard to protein content and glycemic index (GI) on metabolic syndrome (MetSyn) status....

  2. Performance based regulation - The maintenance rule

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Richard P. [NRR/DOTS/TQMP, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, M/S OWFN 10A19, Washington, D.C. 20555 (United States)

    1997-07-01

    The U.S. Nuclear Regulatory Commission has begun a transition from 'process-oriented' to 'results-oriented' regulations. The maintenance rule is a results-oriented rule that mandates consideration of risk and plant performance. The Maintenance Rule allows licensees to devise the most effective and efficient means of achieving the results described in the rule including the use of Probabilistic Risk (or Safety) Assessments. The NRC staff conducted a series of site visits to evaluate implementation of the Rule. Conclusions from the site visits indicated that the results-oriented Maintenance Rule can be successfully implemented and enforced. (author)

  3. Performance based regulation - The maintenance rule

    International Nuclear Information System (INIS)

    Correia, Richard P.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has begun a transition from 'process-oriented' to 'results-oriented' regulations. The maintenance rule is a results-oriented rule that mandates consideration of risk and plant performance. The Maintenance Rule allows licensees to devise the most effective and efficient means of achieving the results described in the rule including the use of Probabilistic Risk (or Safety) Assessments. The NRC staff conducted a series of site visits to evaluate implementation of the Rule. Conclusions from the site visits indicated that the results-oriented Maintenance Rule can be successfully implemented and enforced. (author)

  4. Improving human performance in maintenance personnel

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco; Agueero Agueero, Jorge

    2010-01-01

    The continuous evolution and improvement of safety-related processes has included the analysis, design and development of training plans for the qualification of maintenance nuclear power plant personnel. In this respect, the international references in this area recommend the establishment of systematic qualification programmes for personnel performing functions or carrying out safety related tasks. Maintenance personnel qualification processes have improved significantly, and training plans have been designed and developed based on Systematic Approach to Training methodology to each job position. These improvements have been clearly reflected in recent training programmes with new training material and training facilities focused not only on developing technical knowledge and skills but also on improving attitudes and safety culture. The objectives of maintenance training facilities such as laboratories, mock-ups real an virtual, hydraulic loops, field simulators and other training material to be used in the maintenance training centre are to cover training necessities for initial and continuous qualification. Evidently, all these improvements made in the qualification of plant personnel should be extended to include supplemental personnel (external or contracted) performing safety-related tasks. The supplemental personnel constitute a very spread group, covering the performance of multiple activities entailing different levels of responsibility. Some of these activities are performed permanently at the plant, while others are occasional or sporadic. In order to establish qualification requirements for these supplemental workers, it is recommended to establish a rigorous analysis of job positions and tasks. The objective will be to identify the qualification requirements to assure competence and safety. (authors)

  5. Measuring the performance of maintenance service outsourcing.

    Science.gov (United States)

    Cruz, Antonio Miguel; Rincon, Adriana Maria Rios; Haugan, Gregory L

    2013-01-01

    The aims of this paper are (1) to identify the characteristics of maintenance service providers that directly impact maintenance service quality, using 18 independent covariables; (2) to quantify the change in risk these covariables present to service quality, measured in terms of equipment turnaround time (TAT). A survey was applied to every maintenance service provider (n = 19) for characterization purposes. The equipment inventory was characterized, and the TAT variable recorded and monitored for every work order of each service provider (N = 1,025). Finally, the research team conducted a statistical analysis to accomplish the research objectives. The results of this study offer strong empirical evidence that the most influential variables affecting the quality of maintenance service performance are the following: type of maintenance, availability of spare parts in the country, user training, technological complexity of the equipment, distance between the company and the hospital, and the number of maintenance visits performed by the company. The strength of the results obtained by the Cox model built are supported by the measure of the Rp,e(2) = 0.57 with a value of Rp,e= 0.75. Thus, the model explained 57% of the variation in equipment TAT, with moderate high positive correlation between the dependent variable (TAT) and independent variables.

  6. 2012 Environmental Performance Index and Pilot Trend Environmental Performance Index

    Data.gov (United States)

    National Aeronautics and Space Administration — The 2012 Environmental Performance Index (EPI) ranks 132 countries on 22 performance indicators in the following 10 policy categories: environmental burden of...

  7. Cloud Computing for Maintenance Performance Improvement

    OpenAIRE

    Kour, Ravdeep; Karim, Ramin; Parida, Aditya

    2013-01-01

    Cloud Computing is an emerging research area. It can be utilised for acquiring an effective and efficient information logistics. This paper uses cloud-based technology for the establishment of information logistics for railway system which requires information based on data from different data sources (e.g. railway maintenance, railway operation, and railway business data). In order to improve the performance of the maintenance process relevant data from various sources need to be acquired, f...

  8. Evaluation of implementation an Integrated Safety and Preventive Maintenance System for Improving of Safety Indexes

    Directory of Open Access Journals (Sweden)

    I mohammadfam

    2014-03-01

    Full Text Available Accident analysis shows that one of the main reasons for accidents is non-integration of maintenance units with safety. Merging these two processes through an integrated system can reduce and or eliminate accidents, diseases, and environmental pollution. These issues lead to improvement in organizational performance, as well. The aim of this study is to design and establish an integrated system for obtaining the aforementioned goal. Integration was carried out at Nirou Moharreke Machine Tools Company via Structured System Analysis & Design Method (SSADM. In order to measure the effectiveness of the system, selected indexes were compared using statistical methods prior and after system establishment. Results show that the accident severity index reduced from 135.46 in 2010, to 43.85 in 2012. Moreover, system effectiveness improved equipment reliability and availability (e.g. reliability of the Pfeiffer Milling machine (P (t>50 increased from 0.89 in 2010, to 0.9 in 2012. This system by forecasting various failures, and planning and designing the required operations for preventing occurrence of these failures, plays an important role in improving safety conditions of equipment, and increasing organizational performance, and is capable of presenting an excellent accident prevention program.

  9. Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

    Directory of Open Access Journals (Sweden)

    Farhana Omar Mardhiah

    2017-01-01

    Full Text Available Effectiveness of management in maintenance aspect holds the key element in influencing the performance of overall maintenance management. Similarly, public hospital building needs an effective maintenance management as this type of building in nature is one of the most complex issues in the field of maintenance. Improper building maintenance management adopted by the organization significantly will interrupt the overall operation of the building. Therefore, this paper is aim to identifying the key performance indicator (KPI of effectiveness of maintenance management for the public hospital building. A total of 32 set of questionnaires were distributed to the maintenance manager for each hospital in the northern region of peninsular Malaysia by using self-administration strategy. The survey answer was analyzed by performing descriptive analysis in SPSS. Overall, the result of descriptive analysis shows that all the ten factors of effectiveness of maintenance management are accepted as KPI since the mean value is at least 3.93 which classified as important and significant. The most significant factor of effectiveness of maintenance management is task planning and scheduling with the mean score of 4.35. While less significant factor is identify as maintenance approach with the value of mean score is 3.93. The both results indicates that the management need to have well-structured planning for the maintenance works and also need to embrace the exact strategy of maintenance approach in order to achieved better overall performance of maintenance management. This study may draw a standard practice for the government in assessing the performance of public facilities in terms of maintenance management.

  10. The Road Pavement Condition Index (PCI Evaluation and Maintenance: A Case Study of Yemen

    Directory of Open Access Journals (Sweden)

    Karim Fareed M. A.

    2016-12-01

    Full Text Available The pavement condition index (PCI is a simple, convenient and inexpensive way to monitor the condition of the surface of roads, identify maintenance and rehabilitation (M-and-R needs as well as ensure that road maintenance budgets are spent wisely. In this research, the pavement condition was evaluated in terms of the surface distresses existing at the time of the field evaluation. The PCI procedure was used in this research because it deals with the subject of pavement distress identification most comprehensively and is based on a sound statistical technique of pavement sampling.

  11. AN ANALYSIS OF MAINTENANCE PERFORMANCE SYSTEMS IN THE SOUTH AFRICAN MINING INDUSTRY

    Directory of Open Access Journals (Sweden)

    Kotze, R. L. M.

    2012-11-01

    Full Text Available The measurement of performance is an essential part of the management process. The planning function usually defines the goals and objectives for the business enterprise or division of the enterprise. The control function should monitor the performance measures and establish corrective action if actual performance deviates significantly from planned performance. Maintenance performance measurement is therefore essential to ensure that maintenance objectives are achieved, and that maintenance adds value for the company. The objective of this paper is to discuss the findings of a project that investigated aspects of the maintenance performance system of a number of mining companies in South Africa. The findings of a survey indicated that maintenance performance management is not yet used to its full potential in the mining industry.

  12. BALTICA IV. Plant maintenance for managing life and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hietanen, S; Auerkari, P [eds.; VTT Manufacturing Technology, Espoo (Finland). Operational Reliability

    1999-12-31

    BALTICA IV International Conference on Plant Maintenance Managing Life and performance held on September 7-9, 1998 on board M/S Silja Symphony on its cruise between Helsinki-Stockholm and at Aavaranta in Kirkkonummi. The BALTICA IV conference provides a forum for the transfer of technology from applied research to practice. This is one of the two volumes of the proceedings of the BALTICA IV International Conference on Plant Maintenance Managing Life and Performance. The BALTICA IV conference focuses on new technology, recent experience and applications of condition and life management, and on improvements in maintenance strategies for safe and economical operation of power plants. (orig.)

  13. BALTICA IV. Plant maintenance for managing life and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hietanen, S.; Auerkari, P. [eds.] [VTT Manufacturing Technology, Espoo (Finland). Operational Reliability

    1998-12-31

    BALTICA IV International Conference on Plant Maintenance Managing Life and performance held on September 7-9, 1998 on board M/S Silja Symphony on its cruise between Helsinki-Stockholm and at Aavaranta in Kirkkonummi. The BALTICA IV conference provides a forum for the transfer of technology from applied research to practice. This is one of the two volumes of the proceedings of the BALTICA IV International Conference on Plant Maintenance Managing Life and Performance. The BALTICA IV conference focuses on new technology, recent experience and applications of condition and life management, and on improvements in maintenance strategies for safe and economical operation of power plants. (orig.)

  14. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  15. Performance indicators, practices and maintenance costs in tires management of a transport company

    Directory of Open Access Journals (Sweden)

    Marcos Dario

    2014-12-01

    Full Text Available There are three operational costs that are more expressive for PSL: vehicle maintenance, tires and fuel. In studies of maintenance has been little researched the concept of tire management, technical maintenance and performance together. In this context, this study aims at identifying the practices and performance indicators in the area of maintenance and tire management also analyze the influence of costs applied to the tires on the total cost of maintenance. We conducted a case study of exploratory and descriptive. The main instruments of data collection were on-site observation, unstructured interviews, document analysis and reports results indicators. Data were analyzed by correlation analysis and multiple regression. It was revealed that among the performance indicators in the management of tire maintenance costs applied to the tires have a higher correlation with the total cost of maintenance. The ANOVA indicated that tire maintenance costs influence in 54% of the variations in the total cost of maintenance. We clarified the concepts of maintenance techniques specific tire management, and identify performance indicators in the area of tire managent.

  16. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    International Nuclear Information System (INIS)

    Cooke, Roger; Paulsen, Jette

    1997-01-01

    Measurement of maintenance performance is done on the basis of component history data in which service sojourns are distinguished according to whether they terminate in corrective or preventive maintenance. From the viewpoint of data analysis, corrective and preventive maintenance constitute competing failure nudes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from the Nordic TUD data system

  17. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    Science.gov (United States)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  18. The Maintenance Personnel Performance Simulation (MAPPS) model: A human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: 1) the probability of successfully completing the task of interest and 2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution

  19. Building Maintenance. Performance Objectives. Basic Course.

    Science.gov (United States)

    Taylor, Ernest

    Several intermediate performance objectives and corresponding criterion measures are listed for each of the 13 terminal objectives for a basic high school building maintenance course (the first year of a 3-year program). The materials were developed for a 36-week course (2 hours daily) designed to enable 10th grade students to develop competencies…

  20. Managing wind turbine reliability and maintenance via performance-based contract

    DEFF Research Database (Denmark)

    Jin, Tongdan; Ding, Yi; Guo, Huairui

    2012-01-01

    between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm......Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated...... firms who design and market wind turbines, and also provide maintenance and repair service. PBC differs from conventional service contracts in that the wind farmers compensate the service provider for the system performance, not the spare parts and repair labor. We explore the analytical relationship...

  1. Proceedings of the workshop on better nuclear plant maintenance: improving human and organisational performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-05

    A significant proportion of nuclear plant events is attributable to failures that take place during maintenance and periodic testing. Human and organisational factors are frequently identified as making a major contribution to these events. Despite this recognition, licensee and regulatory oversight in the human and organisational area has tended to focus more on operational matters than maintenance. Owing to the importance of human and organisational performance on nuclear plant maintenance, the CSNI Special Experts' Group on Human and Organisational Factors (SEGHOF) hosted a workshop entitled 'Better nuclear plant maintenance: improving human and organisational performance'. The workshop provided an international forum for staff from nuclear plants, research bodies, and regulators to discuss human and organisational challenges to maintenance, and initiatives to support effective performance. Over 60 participants from about 20 countries participated. The workshop was divided into five sessions: 1) International guidance to improve maintenance performance; 2) Lessons learned through maintenance operating experience; 3) Licensee initiatives to support reliable maintenance; 4) Regulatory approaches to assuring effective licensee maintenance; and 5) Recent trends and their impact on maintenance. Sessions commenced with oral presentations of papers followed by break-out and plenary discussions. Session 4 on regulatory approaches included short presentations from ten regulatory bodies and was followed by discussion comparing these approaches. The main findings of the workshop concern: the retirements of experienced staff; the increasing use of contractors to perform maintenance activities; the use of skill-broadening in maintenance; the role of supervisors at the plant level; the organisational changes that are used to optimise the use of plant staff resources; the effective planning of maintenance tasks; the time allowed to complete maintenance tasks; the development

  2. Investigation of an innovative maintenance contracting strategy : the performance-based maintenance contract (PBMC).

    Science.gov (United States)

    2015-06-01

    One of the major responsibilities of state Departments of Transportation (DOTs) is to maintain their road assets so : that road users can travel cost effectively, safely, and in a timely manner. Maintenance projects can be performed : either by using...

  3. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  4. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    NARCIS (Netherlands)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators

  5. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  6. 2010 Environmental Performance Index (EPI)

    Data.gov (United States)

    National Aeronautics and Space Administration — The 2010 Environmental Performance Index (EPI) ranks 163 countries on environmental performance based on twenty-five indicators grouped within ten core policy...

  7. 2014 Environmental Performance Index (EPI)

    Data.gov (United States)

    National Aeronautics and Space Administration — The 2014 Environmental Performance Index (EPI) ranks 178 countries on 20 performance indicators in the following 9 policy categories: health impacts, air quality,...

  8. 2016 Environmental Performance Index (EPI)

    Data.gov (United States)

    National Aeronautics and Space Administration — The 2016 Environmental Performance Index (EPI) ranks 180 countries on 20 performance indicators in the following 9 policy categories: health impacts, air quality,...

  9. Maintenance Personnel Performance Simulation (MAPPS) model: a human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: (1) the probability of successfully completing the task of interest; and (2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution. The MAPPS model was subjected to a number of evaluation efforts that focused upon its practicality, acceptability, usefulness, and validity. Methods used for these efforts included a case method approach, consensus estimation, and comparison with observed task performance measures at a NPP. Favorable results, such as close agreement between task duration times for two tasks observed in the field (67.0 and 119.8 minutes, respectively), and estimates by MAPPS (72.0 and 124.0 minutes, respectively) enhance the confidence in the future use of MAPPS. 8 refs., 1 fig

  10. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  11. Maintenance and test strategies to optimize NPP equipment performance

    International Nuclear Information System (INIS)

    Mayer, S.; Tomic, B.

    2000-01-01

    This paper proposes an approach to maintenance optimization of nuclear power plant components, which can help to increase both safety and availability. In order to evaluate the benefits of preventive maintenance on a quantitative basis, a software code has been developed for component performance and reliability simulation of safety related nuclear power plant equipment. A three state Markov model will be introduced, considering a degraded state in addition to an operational state and a failed state. (author)

  12. Performance-based maintenance procurement by Dutch housing associations

    NARCIS (Netherlands)

    Straub, A.

    2004-01-01

    OTB Research institute has established a long-term research program to performance-based maintenance procurement in the technical management of housing stock. Stakeholders: housing associations, contractors and the Dutch Building Research Foundation are directly involved in this research program.

  13. MAPPS (Maintenance Personnel Performance Simulation): a computer simulation model for human reliability analysis

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.

    1985-01-01

    A computer model has been developed, sensitivity tested, and evaluated capable of generating reliable estimates of human performance measures in the nuclear power plant (NPP) maintenance context. The model, entitled MAPPS (Maintenance Personnel Performance Simulation), is of the simulation type and is task-oriented. It addresses a number of person-machine, person-environment, and person-person variables and is capable of providing the user with a rich spectrum of important performance measures including mean time for successful task performance by a maintenance team and maintenance team probability of task success. These two measures are particularly important for input to probabilistic risk assessment (PRA) studies which were the primary impetus for the development of MAPPS. The simulation nature of the model along with its generous input parameters and output variables allows its usefulness to extend beyond its input to PRA

  14. Maintenance Management Performance – An Overview towards Evaluating Malaysian Palm Oil Mill

    Directory of Open Access Journals (Sweden)

    Nazim Baluch

    2012-01-01

    Full Text Available Deficient maintenance management can severely affect competitiveness of an organization byreducing throughput, increasing inventory, and leading to poor performance. Performancecannot be managed without measurement: it provides the required information to themanagement for effective decision making; and is used by industries to assess progressagainst set goals and objectives in a quantifiable way for effectiveness and efficiency. For thepalm oil mills to stay competitive, it is imperative that they elevate the maintenancemanagement role; from a cost center to the strategic partner in business. This paperhighlights how measuring maintenance performance helps us identify the factors causing poorperformance, and provides an opportunity to improve company’s profits.Key words: key performance indicators, lean, total productive maintenance

  15. THE DEVELOPMENT OF A PERFORMANCE MEASUREMENT SYSTEM FOR MAINTENANCE

    Directory of Open Access Journals (Sweden)

    J.K. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Business enterprises are under increasing pressure to become internationally competitive due to globalisation. World-class companies from abroad can now easily compete with local companies, introducing high quality products and services to the local community and industry. The pace of technological change is also forcing companies to increase productivity and to become more cost effective. Performance management is part of the strategic management process in the business enterprise and the maintenance department therefore has to address this as part of the strategy formulation for the maintenance function. This paper outlines the strategic management process that is required in the maintenance department and defines a systematic process to develop a performance measurement system for maintenance.

    AFRIKAANSE OPSOMMING: Besigheidsondernemings is onder toenemende druk om internasionaal kompeterend te word weens globalisering. Wêreldklas maatskappye kan nou maklik met plaaslike maatskappye meeding deur hoë kwaliteit produkte en dienste aan die plaaslike gemeenskap en nywerheid te lewer. Die tempo van tegnologiese verandering dwing maatskappye ook om produktiwiteit te verhoog en meer koste-effektief te word. Prestasiebestuur is deel van strategiese bestuur in 'n onderneming en die instandhoudingsafdeling moet derhalwe prestasiebestuur aanspreek as deel van die ontwikkeling van strategie vir die instandhoudingsfunksie. Hierdie artikel bespreek die strategiese bestuursproses soos benodig in die instandhoudingsafdeling en stel 'n sistematiese proses voor vir die ontwikkeling van 'n prestasiemetingstelsel vir instandhouding.

  16. Developing optimized prioritizing road maintenance

    Directory of Open Access Journals (Sweden)

    Ewadh Hussein Ali

    2018-01-01

    Full Text Available Increased demand for efficient maintenance of the existing roadway system needs optimal usage of the allocated funds. The paper demonstrates optimized methods for prioritizing maintenance implementation projects. A selected zone of roadway system in Kerbala city represents the study area to demonstrate the application of the developed prioritization process. Paver system PAVER integrated with GIS is used to estimate and display the pavement condition index PCI, thereby to establish a priority of maintenance. In addition to simple ranking method by PCI produced by the output of PAVER, the paper introduces PCI measure for each section of roadway. The paper introduces ranking by multiple measures investigated through expert knowledge about measures that affect prioritization and their irrespective weights due to a predesigned questionnaire. The maintenance priority index (MPI is related to cost of suitable proposed maintenance, easiness of proposed maintenance, average daily traffic and functional classification of the roadway in addition to PCI. Further, incremental benefit-cost analysis ranking provide an optimized process due to benefit and cost of maintenance. The paper introduces efficient display of layout and ranking for the selected zone of roadway system based on MPI index and incremental BCR method. Although the two developed methods introduce different layout display for priority, statistical test shows that no significant difference between ranking of all methods of prioritization.

  17. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  18. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    DEFF Research Database (Denmark)

    Cooke, R.; Paulsen, J.L.

    1997-01-01

    competing failure modes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from...

  19. 2008 Environmental Performance Index (EPI)

    Data.gov (United States)

    National Aeronautics and Space Administration — The 2008 Environmental Performance Index (EPI) centers on two broad environmental protection objectives: (1) reducing environmental stresses on human health, and (2)...

  20. Integrated Technical Information for the Air Logistics Center: Enhancing Maintenance Technician Task Performance

    National Research Council Canada - National Science Library

    Mitta, Deborah

    1998-01-01

    This technical paper documents the final results of an analysis of the task environment under which depot maintenance technicians perform their jobs--specifically, programmed depot maintenance (PDM) for F-15 aircraft...

  1. A maintenance performance measurement framework that includesmaintenenace human factors: a case study from the electricity transmission industry

    Directory of Open Access Journals (Sweden)

    Peach, Rina

    2016-08-01

    Full Text Available Over the past two to three decades, maintenance management has undergone a paradigm shift; it is no longer seen as a necessary evil, but as an integral part of the business process that creates value for the organisation. The next step in the evolution of maintenance management is a maintenance performance measurement that includes human factors. The human factors in maintenance are well- known in the aviation industry, as it gained momentum in the early 1990s after a series of serious aviation accidents. Other industries, however, have been slow to integrate the human factor in their maintenance performance measurements. This paper discusses the results of a research project that investigated the use and importance of maintenance management performance measurements that focus specifically on human factors as part of the overall performance management system. From the research presented in this paper, ‘motivation’ and ‘competence’ were identified as the most important human performance factors in the maintenance of electricity transmission systems.

  2. Nutritional status of maintenance dialysis patients

    DEFF Research Database (Denmark)

    Koefoed, Mette Juul; Kromann, Charles Boy; Juliussen, Sophie Ryberg

    2016-01-01

    Background and Aims Maintenance dialysis patients are at increased risk of abnormal nutritional status due to numerous causative factors, both nutritional and non-nutritional. The present study assessed the current prevalence of protein-energy wasting, low lean bodymass index and obesity...... protein catabolic rate in order to assess the prevalence of protein-energy wasting, low lean body mass index and obesity in these patients. Results Seventy-nine eligible maintenance dialysis patients participated. The prevalence of proteinenergy wasted patients was 4%(95%CI: 2-12) as assessed......-energy wasting and obesity varied considerably, depending on nutritional assessment methodology. Conclusions Our data indicate that protein-energy wasting is uncommon, whereas low lean body mass index and obesity are frequent conditions among patients in maintenance dialysis. A focus on how to increase...

  3. On line performance monitoring for predictive maintenance [Paper No.: VIA - 2

    International Nuclear Information System (INIS)

    Gupta, R.K.; Chandra, Rajesh

    1981-01-01

    There will always be progressive deterioration in the performance of dynamic equipment due to normal inevitable wear, malfunctions, failures and other reasons. In most cases it is possible to monitor some parameters of a system which would get progressively affected with the deterioration in the health of the system. By on-line monitoring of such predetermined parameters, compared with preset base data generated for a healthy system earlier, would prove very helpful in avoiding breakdowns and in proper planning of preventive and predictive maintenance. With increasing use of on-line computerised controls the generation of design base data and also the in-built self checking feature of monitoring the equipment health can be achieved by incorporating suitable software. This type of system will be helpful in: (a) predicting the life of component, (b) prewarning the operator about impending malfunctions, (c) establishing a maintenance schedule and spare inventory, and (d) analysing the failures. This type of centralised predictive maintenance is increasingly becoming important where: (a) the number of equipments are large, (b) the operation of equipment is critical from safety criteria, and (c) the minimum safety margin in the performance of the component is to be maintained. Keeping this in mind, the Fuel Handling System of Narora Atomic Power Project and the future power plants having computerised controls will have facility for on-line performance monitoring for predictive maintenance. The paper also describes methodology of the technique in detail, with a few representative cases. (author)

  4. Key Performance Indicator of Building Maintenance and Its Effect on the Building Life Cycle

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-07-01

    Full Text Available Building maintenance is considered as one of the national agenda. Multitude barriers received by the services providers have undergone various difficulties in satisfying public interest have been progressively resolved as a sign towards becoming a more developed country. In real practice, building maintenance is the thing which we mostly tolerate. If the building is able to weather the elements, we may with delay taking action on it. Most buildings are always treated with ‘ad-hoc’ maintenance. In some instances, the building disrepair will wait until complaints are made before any repair work is done. It shows that the situation is not considered critical as it may. Maintenance is still being practiced in improper procedure by the maintenance managers which subsequently caused bad impacts to the facilities and the services provided. It can be seen that the managers prefer carrying out reactive maintenance works rather than proactive works and at times do not consider the clients satisfaction and also the performance of services. This paper will focus on some important elements of building maintenance and its relation to building performance holistically.

  5. Performance Evaluation of Some Index Funds-Indian Perspective

    Directory of Open Access Journals (Sweden)

    Pranav Mishra

    2016-04-01

    Full Text Available The popularity of the index funds as an investment option has increased manifolds ever since they were introduced. This is primarily because of the merits that the investor enjoys through passive style of funds management. This includes the low cost involved in managing such funds and the significant tax savings. Most of the researchers have compared the performance of the actively managed funds with that of index funds. However the index funds of US and for that reason other parts of the world are different from that of India. Unlike other countries in India the benchmark indices comprise of very less number of securities and thus are unable to represent the entire economy. So in Indian context comparison of performance of actively managed funds with index funds is not logical. Therefore this paper attempts to make an intra-class performance evaluation of some Indian index funds based on some statistics. The study includes the use of graphical interpretations coupled with statistical tools like R-square and tracking error values. Two models of tracking error have been employed to test empirically the performance of the selected index funds. The study is useful for those interested in mutual funds, which includes researchers, academicians, and financial advisors. The paper suits the requirement and the situations prevalent in Indian economy during the period under study.

  6. METHODOLOGY OF DETERMINATION OF QUALITY INDEX OF MAINTENANCE SERVICE SYSTEM OF POWER EQUIPMENT OF TRACTION SUBSTATIONS

    Directory of Open Access Journals (Sweden)

    O.O. Matusevych

    2016-03-01

    Full Text Available Purpose. The purpose of this paper is development of methodology for definition of a quality system of maintenance and repair (M and P power equipment of traction substations (TS of electrified railways operating under conditions of uncertainty based on expert information. Methodology. The basic tenets of the theory of fuzzy sets and marks, linguistic and interval estimates of experts were applied to solve this problem. Results. Analysis of the existing diversity of approaches to development of modern methods of improvement of M and P allows us to conclude that the improvement in the quality of the system is achieved by solving individual problems increase the operational reliability of power equipment of traction substations in the following main interrelated areas. There are technical, economic and organizational. The basis of the quality evaluation system is initial data and expertise developed version of the document formalized quality evaluation of electrical equipment of traction substations by experts. The choice of determining the level of Quality service system based on the marks, linguistic and interval estimates of experts, which are reflected in quantitative and / or qualitative form was done. The possible options for expert data presentation and their corresponding quantitative methods of calculating the integral index of quality improvement system maintenance and P of traction substations were described. The methodology and the method of assessing the quality of system maintenance and P of TS allows quickly respond to changing operating conditions of power equipment of traction substations, and to determine the most effective strategies for maintenance of electrical and P TS under conditions of uncertainty functioning distance electricity. Originality. The method of a systematic approach to improve the quality of the system maintenance and P of power equipment of traction substation under conditions of uncertainty based on expert

  7. Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops

    Directory of Open Access Journals (Sweden)

    Mehmet Talha Dulman

    2018-01-01

    Full Text Available Sensors are commonly employed to monitor products during their life cycles and to remotely and continuously track their usage patterns. Installing sensors into products can help generate useful data related to the conditions of products and their components, and this information can subsequently be used to inform EOL decision-making. As such, embedded sensors can enhance the performance of EOL product processing operations. The information collected by the sensors can also be used to estimate and predict product failures, thereby helping to improve maintenance operations. This paper describes a study in which system maintenance and EOL processes were combined and closed-loop supply chain systems were constructed to analyze the financial contribution that sensors can make to these procedures by using discrete event simulation to model and compare regular systems and sensor-embedded systems. The factors that had an impact on the performance measures, such as disassembly cost, maintenance cost, inspection cost, sales revenues, and profitability, were determined and a design of experiments study was carried out. The experiment results were compared, and pairwise t-tests were executed. The results reveal that sensor-embedded systems are significantly superior to regular systems in terms of the identified performance measures.

  8. Effects of maintenance electroconvulsive therapy on cognitive functions

    NARCIS (Netherlands)

    Vothknecht, S.; Kho, K. H.; van Schaick, H. W.; Zwinderman, A. H.; Middelkoop, H.; Blansjaar, B. A.

    2003-01-01

    Background: This study examined cognitive side effects of maintenance electroconvulsive (ECT) in comparison with maintenance pharmacotherapy after index ECT. Method: Clinical outcome data and neuropsychological measurements were compared in 11 maintenance ECT patients and 13 control patients treated

  9. Pilot 2006 Environmental Performance Index (EPI)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Pilot 2006 Environmental Performance Index (EPI) centers on two broad environmental protection objectives: (1) reducing environmental stresses on human health,...

  10. Conversion of a mainframe simulation for maintenance performance to a PC environment

    International Nuclear Information System (INIS)

    Gertman, D.I.

    1991-01-01

    A computer-based simulation capable of generating human error probabilities (HEPs) for maintenance activities is presented. The HEPs are suitable for use in probabilistic risk assessments (PRAs) and are an important source of information for data management systems such as NUCLARR- the Nuclear Computerized Library for Assessing Reactor Reliability. (1) The basic computer model MAPPS--the maintenance personnel performance simulation has been developed and validated by the US NRC in order to improve maintenance practices and procedures at nuclear power plants. This model validated previously, has now been implemented and improved, in a PC environment, and renamed MicroMAPPS. The model is stochastically based, able to simulate the performance of 2 to 15 person crews for a variety of maintenance conditions. These conditions include aspects of crew actions as potentially influenced by the task, the environment, or characteristics of the personnel involved. The nature of the software code makes it particularly appropriate for determining changes in HEP rates due to fluctuations in important task, environment,. or personnel parameters. The presentation presents a brief review of the mainframe version of the code and presents a summarization of the enhancements which dramatically change the nature of the human computer interaction

  11. Maintenance as a Guarantee for Roofing Performance in Buildings with Heritage Value

    Directory of Open Access Journals (Sweden)

    Patrícia Fernandes Rocha

    2016-04-01

    Full Text Available This paper is the result of the research conducted at the University of Porto and follows up on the Ph.D. thesis developed by the second author, which deals with the issue of the non-inclusion of maintenance at the time of architectural design, and of support instruments for the project author to help him in this endeavor. This work is intended to apply a guiding methodology to the design process that includes building maintenance benchmarked by the service behavior with regard to pitched roofs. The development of a decision support model enabled to obtain a maintainability index (MI to be identified and results from the combination of two indicators: the importance indicator (Iid and the easiness indicator (Eid. The results achieved enable the project author to have a support tool for making decisions that affect the building behavior in service as well the act of the preservation of heritage value.

  12. TFAP2B -Dietary Protein and Glycemic Index Interactions and Weight Maintenance after Weight Loss in the DiOGenes Trial

    DEFF Research Database (Denmark)

    Stocks, Tanja; Ängquist, Lars Henrik; Hager, Jörg

    2013-01-01

    Background: TFAP2B rs987237 is associated with obesity and has shown interaction with the dietary fat-to-carbohydrate ratio, which has an effect on weight loss. We investigated interactions between rs987237 and protein-to-carbohydrate ratio or glycemic index (GI) in relation to weight maintenance...... percentage from fat: either low-protein/low-GI, low-protein/high-GI, high-protein/low-GI, or high-protein/high-GI diets, or a control diet for a 6-month weight maintenance period. Using linear regression analyses and additive genetic models, we investigated main and dietary interaction effects of TFAP2B rs...... diverge depending on the nutritional state. © 2013 S. Karger AG, Basel....

  13. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    Science.gov (United States)

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  14. Analyzing the performance index for a hybrid electric vehicle

    NARCIS (Netherlands)

    Ngo, D. V.; Hofman, T.; Steinbuch, M.; Serrarens, A. F A

    2011-01-01

    The definition of a performance index for the optimization design and optimal control problem of a Hybrid Electric Vehicle is not often considered and analyzed explicitly. In literature, there is no study about proposing a method of building or evaluating whether a performance index is appropriate.

  15. Performance Improvement through Implementation of Lean Maintenance

    OpenAIRE

    S. Kolanjiappan; Dr. K. Maran

    2011-01-01

    Lean Maintenance is a relatively new term, invented in the last decade of the twentieth century, but the principles are well established in Total Productive Maintenance (TPM). Lean Maintenance—taking its lead from Lean Manufacturing—applies some new techniques to TPM concepts to render a more structured implementation path. Tracing its roots back to Henry Ford with modern refinements born in Japanese manufacturing, specifically the Toyota Production System (TPS). Lean seeks to eliminate a...

  16. The International Coal Statistics Data Base program maintenance guide

    International Nuclear Information System (INIS)

    1991-06-01

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig

  17. 25 CFR 170.809 - Can a tribe perform road maintenance under a self-determination contract or self-governance...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a tribe perform road maintenance under a self..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.809 Can a tribe perform road maintenance under a self-determination contract or self-governance agreement...

  18. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  19. Payment mechanisms for winter road maintenance services

    Directory of Open Access Journals (Sweden)

    Adel Abdi

    2013-12-01

    Full Text Available In countries with severe winters a major part of the annual budget for road maintenance is allocated on performance of winter road maintenance tasks. Finding appropriate remuneration forms to compensate entrepreneurs for performed road measures during winter is not an easy task in order to minimise or eliminate disputes and satisfy both client organisations and contractors. On the other hand improper reimbursement models lead either to the client’s annual budget imbalance due to unnecessary cost overruns or affect contractor’s cash-flow. Such cases in turn affect just-in-time winter road maintenance and then traffic safety. To solve such problems, a number of countries in cold regions like Sweden have developed different remuneration models based more on weather data called Weather Index. Therefore the objective of this paper is to investigate and evaluate the payment models applied in Sweden. The study uses a number of approaches namely; domestic questionnaire survey, analysis of a number of contract documents, a series of meetings with the project managers and an international benchmarking. The study recognised four remuneration models for winter maintenance service of which one based on weather data statistics. The study reveals the payment model based on weather data statistics is only applied for the roads with higher traffic flow and the model generates most uncertainty.

  20. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Highlights: ► Operators regard lack of 3D perception as primary factor hindering remote maintenance. ► Promising techniques to improve depth perception are depth gauges and stereo vision. ► First experiment shows artificial depth gauges need to be designed with care. ► Second experiment shows that stereo vision improves task performance significantly. -- Abstract: Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance. This paper discusses various techniques to improve depth perception in teleoperation, including stereo vision, head tracking, virtual camera views and depth gauges. The most promising techniques were tested. Performance metrics included time-to-complete, path analysis and operator work-load. In a first experiment, artificial depth gauges views were tested in a 1:1 scale hardware testbed with mechanical master-slave manipulators handled by experienced operators. Robust real-time image processing was achieved with marker-based objects. The simple depth gauge and graphical overlay did not significantly improve task performance. Operators commented on their view of the task being “obstructed” by the graphical overlay, and the depth gauge was judged not very informative. In a second experiment, real time tracking was combined with VR display including stereo and head tracking. While stereo was found to improve the task performance significantly over the 1 camera (mono) condition, head tracking unexpectedly did not

  1. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    Energy Technology Data Exchange (ETDEWEB)

    Heemskerk, C.J.M., E-mail: c.heemskerk@heemskerk-innovative.nl [Heemskerk Innovative Technology, Sassenheim (Netherlands); Eendebak, P.T. [TNO Netherlands Organisation for Applied Scientific Research (Netherlands); Schropp, G.Y.R. [Heemskerk Innovative Technology, Sassenheim (Netherlands); Hermes, H.V. [TU Eindhoven (Netherlands); Elzendoorn, B.S.Q. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Magielsen, A.J. [NRG, P.O. Box 25, 1755 ZG Petten (Netherlands)

    2013-10-15

    Highlights: ► Operators regard lack of 3D perception as primary factor hindering remote maintenance. ► Promising techniques to improve depth perception are depth gauges and stereo vision. ► First experiment shows artificial depth gauges need to be designed with care. ► Second experiment shows that stereo vision improves task performance significantly. -- Abstract: Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance. This paper discusses various techniques to improve depth perception in teleoperation, including stereo vision, head tracking, virtual camera views and depth gauges. The most promising techniques were tested. Performance metrics included time-to-complete, path analysis and operator work-load. In a first experiment, artificial depth gauges views were tested in a 1:1 scale hardware testbed with mechanical master-slave manipulators handled by experienced operators. Robust real-time image processing was achieved with marker-based objects. The simple depth gauge and graphical overlay did not significantly improve task performance. Operators commented on their view of the task being “obstructed” by the graphical overlay, and the depth gauge was judged not very informative. In a second experiment, real time tracking was combined with VR display including stereo and head tracking. While stereo was found to improve the task performance significantly over the 1 camera (mono) condition, head tracking unexpectedly did not.

  2. Performance of Water Recirculation Loop Maintenance Components for the Advanced Spacesuit Water Membrane Evaporator

    Science.gov (United States)

    Rector, Tony; Peyton, Barbara M.; Steele, John W.; Makinen, Janice; Bue, Grant C.; Campbell, Colin

    2014-01-01

    Water loop maintenance components to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop have undergone a comparative performance evaluation with a second SWME water recirculation loop with no water quality maintenance. Results show the benefits of periodic water maintenance. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the evaluation of water recirculation maintenance components was to further enhance this advantage through the leveraging of fluid loop management lessons learned from the International Space Station (ISS). A bed design that was developed for a UTAS military application, and considered for a potential ISS application with the Urine Processor Assembly, provided a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The maintenance cycle included the use of a biocide delivery component developed for ISS to introduce a biocide in a microgravity compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.

  3. Maintenance Personnel Performance Simulation (MAPPS) model: description of model content, structure, and sensitivity testing. Volume 2

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.

    1984-12-01

    This volume of NUREG/CR-3626 presents details of the content, structure, and sensitivity testing of the Maintenance Personnel Performance Simulation (MAPPS) model that was described in summary in volume one of this report. The MAPPS model is a generalized stochastic computer simulation model developed to simulate the performance of maintenance personnel in nuclear power plants. The MAPPS model considers workplace, maintenance technician, motivation, human factors, and task oriented variables to yield predictive information about the effects of these variables on successful maintenance task performance. All major model variables are discussed in detail and their implementation and interactive effects are outlined. The model was examined for disqualifying defects from a number of viewpoints, including sensitivity testing. This examination led to the identification of some minor recalibration efforts which were carried out. These positive results indicate that MAPPS is ready for initial and controlled applications which are in conformity with its purposes

  4. A development of maintenance educational support method by using navigation method. Pt. 1. A conceptual design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Gouda, Hidenori

    2001-01-01

    The purpose of this research is before hand prevention of the systematic error produced from the fault of command / command system on the different organization in a nuclear power plant, and the individual error of the demand level of maintenance work, and knowledge and experience level of a maintenance worker produced from it being incongruent (mismatch), and generating of the serious accident and a serious trouble. This research attains optimization with the difficulty of maintenance work, and work execution capability, such as the persons concerned (a supervision person, a construction person, work person), and proposes the new 'maintenance educational support technique' which is useful to the improvement in 'work reliability' and 'before hand prevention of a human error' in the maintenance work spot. The main results concerning this research are shown below. (1) In this research, concept design of RHR pump maintenance work educational support prototype system was performed on the basis of the examination result of a process analysis of RHR pump maintenance work, load mapping, a rule base/knowledge base and a data base/filing system. Consequently, when an educator-ed talked with a data base/filing system along with load mapping of maintenance work (Why, How, What), a possibility that it could reach exactly from work start to the sub goal or the last goal and timely was suggested. (2) As a result of classifying 'the difficulty of maintenance work', and man's work execution capability' and comparing the result using SRK (behavior of human) index which Rasmussen proposed, among both, it turns out that difference (inharmonious) arises. The exact presentation of the educational method or educational material which responded to knowledge and experience level of an educational achievement target or an educator-ed can be referred to as being connected with the improvement in work reliability, and before hand prevention of a human error as a result by then, incorporating

  5. A study on human performance enhancement plan in maintenance field by survey on actual condition of human performance tools - 15035

    International Nuclear Information System (INIS)

    Park, J.; Jeong, H.; Kim, Y.

    2015-01-01

    Human errors in nuclear power plant are one of the important factors that may cause reactor trip. Most operating companies of nuclear power plants manage human factor systematically through tools like HPES (Human Performance Enhancement), PSR (Periodic Safety Review), OE (Operating Experience), human performance tools, safety culture assessment and CAP (Corrective Action Program). But human factors are managed passively in maintenance field, because maintenance works are carrying out by partner companies. KHNP also contracts the maintenance work to the partner companies, and advise them to use human performance tools. But the actual condition on partner companies has not been surveyed. This paper suggests some plans that can improve human performance by analyzing the opinion of partner company employees about the causes and solutions of human errors, by analyzing utilization of human performance tools and by comparing the results of the partner companies survey with the results of the operating company survey. The survey is conducted to 3 partner companies by similar contents and categories in order to compare partner company with operating company, and the main analysis fields are the following: -1) Level of understanding and utilization of the human performance tools, -2) Difficulties of applying the human performance tools, -3) Level of employee's training (or education) in the use of the human performance tools, and -4) Root causes of human errors and countermeasures. (authors)

  6. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  7. Distinct electrophysiological indices of maintenance in auditory and visual short-term memory.

    Science.gov (United States)

    Lefebvre, Christine; Vachon, François; Grimault, Stephan; Thibault, Jennifer; Guimond, Synthia; Peretz, Isabelle; Zatorre, Robert J; Jolicœur, Pierre

    2013-11-01

    We compared the electrophysiological correlates for the maintenance of non-musical tones sequences in auditory short-term memory (ASTM) to those for the short-term maintenance of sequences of coloured disks held in visual short-term memory (VSTM). The visual stimuli yielded a sustained posterior contralateral negativity (SPCN), suggesting that the maintenance of sequences of coloured stimuli engaged structures similar to those involved in the maintenance of simultaneous visual displays. On the other hand, maintenance of acoustic sequences produced a sustained negativity at fronto-central sites. This component is named the Sustained Anterior Negativity (SAN). The amplitude of the SAN increased with increasing load in ASTM and predicted individual differences in the performance. There was no SAN in a control condition with the same auditory stimuli but no memory task, nor one associated with visual memory. These results suggest that the SAN is an index of brain activity related to the maintenance of representations in ASTM that is distinct from the maintenance of representations in VSTM. © 2013 Elsevier Ltd. All rights reserved.

  8. Performance Assessment of Maintenance Practices in Government Office Buildings: Case Study of Parcel E, Putrajaya

    Directory of Open Access Journals (Sweden)

    Awg Husaini A.I.

    2014-03-01

    Full Text Available Building maintenance practices must be taken into consideration by building facility managers or building owners. They involve daily operations to ensure that end users can work or live comfortably and safely. Through effective maintenance practices, the functions of the existing building facilities can be maintained and meet the needs of the building users. Maintenance practices must be effective in aspects such as planning, organization and supervision in order to maintain the building at a satisfactory level of performance all the time. A study was conducted on a Federal government office building in Parcel E, Putrajaya to determine the maintenance aspects of the management of the facility. To achieve the objectives of this study a questionnaire survey was used to obtain the required data. The outcomes indicate that the aspects of building maintenance practice and the effectiveness of the maintenance management in government office buildings can influence the satisfaction of the end user. However, some aspects of the current building maintenance practices seem to need improvements in order to enhance the building maintenance management. The recommendations of this study will help in the effective management of the facility and maintenance management practices.

  9. Conversion of a mainframe simulation for maintenance performance to a PC environment

    International Nuclear Information System (INIS)

    Gertman, D.I.

    1990-01-01

    The computer model MAPPS, the Maintenance Personnel Performance Simulation, has been developed and validated by the US NRC [Nuclear Regulatory Commission] in order to improve maintenance practices and procedures at nuclear power plants. This model has now been implemented and improved, in a PC [personal computer] environment and renamed MICROMAPPS. The model is stochastically based and users are able to simulate the performance of 2- to 8-person crews for a variety of maintenance tasks under a variety of conditions. These conditions include aspects of crew actions as potentially influenced by the task, the environment, or the personnel involved. For example, the influence of the following factors is currently modeled within the MAPPS computer code: (1) personnel characteristics include but are not limited to intellectual and perceptual motor ability levels, the effect of fatigue and conversely, of rest breaks on performance, stress, communication, supervisor acceptance, motivation, organizational climate, time since the tasks was last performed and the staffing level available; (2) task variables include but are not limited to time allowed, occurrence of shift change, intellectual requirements, perceptual motor requirements, procedures quality, necessity for protective clothing and essentiality of a procedures quality, necessity for protective clothing and essentiality of a subtask; and (3) environment variables include temperature of the workplace, radiation level, and noise levels. The output describing maintainer performance includes subtask and task identification, success proportion, work and wait durations, time spent repeating various subtasks and outcome in terms of errors detected by the crew, false alarms, undetected errors, duration, and the probability of success. The model is comprehensive and allows for the modeling of decision making, trouble-shooting and branching of tasks

  10. The anticipated costs analysis and benefit items survey against performing the maintenance rule

    International Nuclear Information System (INIS)

    Hwang, M. J.; Kim, K. Y.; Yang, Z. A.

    2002-01-01

    In this paper, we surveyed the cost and benefit items and evaluated the costs against performing the Maintenance Rule. In the past, only one electric power company had provided the electricity without free competition in Korea. In these days, however, the electric power company was divided into two parts by the sources: atomic and hydraulic generation and thermal-power generation. Therefore, the generation sources that done have competitiveness at the price will be weeded out in the electric power market. Although the preferential goal is on the safe operation at the Nuclear power Plants (NPPs), if too much money is required to maintain or improve the safety of the NPP, the licensee could hesitate to adopt the program related to the safety even though it is a good one. Since the Risk-Informed Applications (RIA) have been using for a plant operation in recent, the condition of a plant might be changed. Therefore, considering the affects of the RIA, a method to keep the capability through the monitoring the maintenance effectiveness has been proposed. However, to perform this, a number of works, continuous collecting data and monitoring the maintenance effectiveness and understanding the reason of degrading capability, should be preceded. Therefore, a lot of man-hour is needed to develop and to manage the application method, and the licensee should pay the costs. Therefore, in the domestic circumstance, it is necessary to evaluate the cost to monitor the maintenance effectiveness. Hence, we are going to examine the cost to perform the MR and its anticipated benefit lists

  11. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  12. Interpretive Structural Model of Key Performance Indicators for Sustainable Maintenance Evaluatian in Rubber Industry

    Science.gov (United States)

    Amrina, E.; Yulianto, A.

    2018-03-01

    Sustainable maintenance is a new challenge for manufacturing companies to realize sustainable development. In this paper, an interpretive structural model is developed to evaluate sustainable maintenance in the rubber industry. The initial key performance indicators (KPIs) is identified and derived from literature and then validated by academic and industry experts. As a result, three factors of economic, social, and environmental dividing into a total of thirteen indicators are proposed as the KPIs for sustainable maintenance evaluation in rubber industry. Interpretive structural modeling (ISM) methodology is applied to develop a network structure model of the KPIs consisting of three levels. The results show the economic factor is regarded as the basic factor, the social factor as the intermediate factor, while the environmental factor indicated to be the leading factor. Two indicators of social factor i.e. labor relationship, and training and education have both high driver and dependence power, thus categorized as the unstable indicators which need further attention. All the indicators of environmental factor and one indicator of social factor are indicated as the most influencing indicator. The interpretive structural model hoped can aid the rubber companies in evaluating sustainable maintenance performance.

  13. Performance of Islamic Stocks Index: Comparative Studies Between Indonesia and Malaysia

    Directory of Open Access Journals (Sweden)

    Tulasmi Tulasmi

    2016-06-01

    Full Text Available The aim of this research is to compare the Islamic stocks index performance between Malaysia and Indonesia using Sharpe method, Treynor method, and Jensen method. The result show that the Islamic stocks index performance in Indonesia –measured by Jakarta Islamic Index- is better than Malaysia if using Treynor and Jensen methods. Otherwise, using the Sharpe method show that Islamic stock index in Malaysia is better than Islamic stocks index in Indonesia. The implication from this result is the investor with enough funds recommended to invest in Indonesia, but the small investor can do the investment to Islamic stocks index in Malaysia.DOI:  10.15408/sjie.v5i1.3127 

  14. A probabilistic computational framework for bridge network optimal maintenance scheduling

    International Nuclear Information System (INIS)

    Bocchini, Paolo; Frangopol, Dan M.

    2011-01-01

    This paper presents a probabilistic computational framework for the Pareto optimization of the preventive maintenance applications to bridges of a highway transportation network. The bridge characteristics are represented by their uncertain reliability index profiles. The in/out of service states of the bridges are simulated taking into account their correlation structure. Multi-objective Genetic Algorithms have been chosen as numerical tool for the solution of the optimization problem. The design variables of the optimization are the preventive maintenance schedules of all the bridges of the network. The two conflicting objectives are the minimization of the total present maintenance cost and the maximization of the network performance indicator. The final result is the Pareto front of optimal solutions among which the managers should chose, depending on engineering and economical factors. A numerical example illustrates the application of the proposed approach.

  15. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  16. Comprehensive framework for preventive maintenance priority of medical equipment.

    Science.gov (United States)

    Saleh, Neven; Balestra, Gabriella

    2015-08-01

    Throughout the medical equipment life cycle, preventive maintenance is considered one of the most important stages that should be managed properly. However, the need for better management and control by giving a reasonable prioritization for preventive maintenance becomes essential. The purpose of this study is to develop a comprehensive framework for preventive maintenance priority of medical equipment using Quality Function Deployment (QFD) and Fuzzy Logic (FL). The quality function deployment is proposed in order to identify the most important criteria that could impact preventive maintenance priority decision; meanwhile the role of the fuzzy logic is to generate a priority index of the list of equipment considering those criteria. The model validation was carried out on 140 pieces of medical equipment belonging to two hospitals. In application, we propose to classify the priority index into five classes. The results indicate that the strong correlation existence between risk-based criteria and preventive maintenance priority decision.

  17. Operations and maintenance performance in oil and gas production assets. Theoretical architecture and capital value theory in perspective

    Energy Technology Data Exchange (ETDEWEB)

    Liyanage, Jayantha P.

    2003-07-01

    In response to growing demands from the Norwegian oil and gas industry, a joint industry project on the development and implementation of operations and maintenance performance indicators for the petroleum industry was initiated by the Center for Asset and Maintenance Management of Stavanger University College, Norway, in 1999. The project consortium composed of BP, Shell, Philips, Statoil, NorskHydro, Norwegian Petroleum Directorate, PricewaterhouseCoopers, Andersen Consulting, DNV, Industrial and Financial Systems (IFS), ADB Systems AS, DNV, RC Consultants and Tieto Enator. While the project was managed effectively to serve the expectations of member organizations, its boundaries were predefined by various conditions within organizational environments leaving a substantial space unexplored. Hence, the width and the breadth of operations and maintenance performance captured by the project were largely limited. This called for an independent research study to explore the phenomenon with a more broader or holistic perspective. Notably thus, while the project was devoted to a down-to-earth component of the exercise, i.e. to develop performance indicators, the exploratory research study was launched alongside to bring a theoretical or a philosophical insight. The study was conducted during 2000-2002 with collaboration of 14 organizations within the Norwegian continental shelf. The population included oil and gas producers regulatory and verification bodies and third parties. The study identified the bulk of problems that the entire problem domain constitute of within operations and maintenance performance. They were classified into some theoretical forms, and the study concentrated on, what I term, technical alienation, i.e. lack of descriptive performance models to guide meaningful assessment and management of operations and maintenance performance. The choice to shed some light in this endeavor was based on the relevance to SDV project, emerging managerial interest

  18. Operations and maintenance performance in oil and gas production assets. Theoretical architecture and capital value theory in perspective

    International Nuclear Information System (INIS)

    Liyanage, Jayantha P.

    2003-01-01

    In response to growing demands from the Norwegian oil and gas industry, a joint industry project on the development and implementation of operations and maintenance performance indicators for the petroleum industry was initiated by the Center for Asset and Maintenance Management of Stavanger University College, Norway, in 1999. The project consortium composed of BP, Shell, Philips, Statoil, NorskHydro, Norwegian Petroleum Directorate, PricewaterhouseCoopers, Andersen Consulting, DNV, Industrial and Financial Systems (IFS), ADB Systems AS, DNV, RC Consultants and Tieto Enator. While the project was managed effectively to serve the expectations of member organizations, its boundaries were predefined by various conditions within organizational environments leaving a substantial space unexplored. Hence, the width and the breadth of operations and maintenance performance captured by the project were largely limited. This called for an independent research study to explore the phenomenon with a more broader or holistic perspective. Notably thus, while the project was devoted to a down-to-earth component of the exercise, i.e. to develop performance indicators, the exploratory research study was launched alongside to bring a theoretical or a philosophical insight. The study was conducted during 2000-2002 with collaboration of 14 organizations within the Norwegian continental shelf. The population included oil and gas producers regulatory and verification bodies and third parties. The study identified the bulk of problems that the entire problem domain constitute of within operations and maintenance performance. They were classified into some theoretical forms, and the study concentrated on, what I term, technical alienation, i.e. lack of descriptive performance models to guide meaningful assessment and management of operations and maintenance performance. The choice to shed some light in this endeavor was based on the relevance to SDV project, emerging managerial interest

  19. Pavement Pre- and Post-Treatment Performance Models Using LTPP Data

    OpenAIRE

    Lu, Pan; Tolliver, Denver

    2012-01-01

    This paper determines that pavement performance in International Roughness Index (IRI) is affected by exogenous interventions such as pavement age, precipitation level, freeze-thaw level, and lower level preservation maintenance strategies. An exponential function of pavement age was used to represent pavement IRI performance curves. Moreover, this paper demonstrates a method which calculates short-term post-pavement performance models from maintenance effect models and pre-treatment performa...

  20. Moral, Ethical and Legal Considerations with the Use of Drugs for Performance Maintenance in the Canadian Forces

    Science.gov (United States)

    2009-10-01

    drugs . Most controlled drugs with performance maintenance characteristics would fall under schedule 3 of the Act. CF members’ consumption of performance...21 - 4 RTO-MP-HFM-181 Disorder (ADHD) to increase attention. Caffeine itself is the world’s most widely used psychoactive drug and by far the...RTO-MP-HFM-181 21 - 1 Moral, Ethical and Legal Considerations with the Use of Drugs for Performance Maintenance in the Canadian Forces

  1. A general solution to the material performance index for bending strength design

    International Nuclear Information System (INIS)

    Burgess, S.C.; Pasini, D.; Smith, D.J.; Alemzadeh, K.

    2006-01-01

    This paper presents a general solution to the material performance index for the bending strength design of beams. In general, the performance index for strength design is ρ f q /ρ where σ f is the material strength, ρ is the material density and q is a function of the direction of scaling. Previous studies have only solved q for three particular cases: proportional scaling of width and height (q=2/3), constrained height (q=1) and constrained width (q=1/2). This paper presents a general solution to the exponent q for any arbitrary direction of scaling. The index is used to produce performance maps that rank relative material performance for particular design cases. The performance index and the performance maps are applied to a design case study

  2. Comparison of two approaches for establishing performance criteria related to Maintenance Rule

    International Nuclear Information System (INIS)

    Jerng, Dong-Wook; Kim, Man Cheol

    2015-01-01

    Probabilistic safety assessment (PSA) serves as a tool for systemically analyzing the safety of nuclear power plants. This paper explains and compares two approaches for the establishment of performance criteria related to the Maintenance Rule: (1) the individual reliability-based approach, and (2) the PSA importance measure-based approach. Different characteristics of the two approaches were compared in a qualitative manner, while a quantitative comparison was performed through application of the two approaches to a nuclear power plant. It was observed that the individual reliability-based approach resulted in more conservative performance criteria, compared to the PSA importance measure-based approach. It is thus expected that the PSA importance measure-based approach will allow for more flexible maintenance policy under conditions of limited resources, while providing for a macroscopic view of overall plant safety. Based on insights derived through this analysis, we emphasize the importance of a balance between reliability and safety significance, and propose a balance measure accordingly. The conclusions of this analysis are likely to be applicable to other types of nuclear power plants. (author)

  3. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  4. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  5. Pricing and performance in health maintenance organizations: a strategic management perspective.

    Science.gov (United States)

    Conant, J S; Mokwa, M P; Burnett, J J

    1989-03-01

    Innovative, consumer-oriented pricing strategies have contributed to the impressive growth of health maintenance organizations (HMOs). In a national study of HMO marketing directors, the relationships between strategic management style and (1) the relative importance of pricing in competitive marketing strategy, (2) the effectiveness of price strategy planning, and (3) financial performance are examined. The findings indicate that HMOs practicing effective price planning also perform well on an overall basis. Insight into the content and substance of HMO pricing strategies is also provided.

  6. The Development and Application of a Value-Driven Aircraft Maintenance Operations Performance Assessment Model combined with Real Options Analysis

    NARCIS (Netherlands)

    Goossens, H.G.; Beelaerts van Blokland, W.W.A.; Curran, R.

    2011-01-01

    This research paper presents the results from the development of an Aircraft Maintenance Operations Performance Assessment Model (AMOPAM). The AMOPAM is able to assess the differences in performance in between two different states or scenarios of aircraft maintenance operations and is able to

  7. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  8. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  9. An experimental study on the effect of noise and sleep loss on human performance using the measure of TCI during NPP maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Hyun Jun

    2008-02-15

    There are various stressors in NPP maintenance, such as environmental stressors and work-related stressors. These stressors degrade human performance and increase human error. Stress has not been largely considered as a factor of human error in root cause analyses. Recently, however, regulatory bodies and research institutes have worked to manage the physical condition of the operator and improve the environment and methods of NPP maintenance. These efforts have focused on reducing the incidence of human error due to stress. It is necessary to study how much stress affects human performance before these efforts are complete. The objectives of the present study are to formulate a Task Concentration Index (TCI) based on Electrocardiogram (ECG) signals in order to evaluate the degree to which a person concentrates on a task experimentally. With the TCI, the study will also evaluate the effects of noise and sleep loss on human performance during NPP maintenance tasks. Stress influences the efficiency of information processing and data input and output. Stress and human error are tightly linked in a closed-loop combination. The human body responds to stress by activating the nervous system and specific hormones. Therefore, physiological signals are changed by stress. A spectral analysis of Heart Rate Variability (HRV) provides a noninvasive technique for indirectly measuring sympathetic and parasympathetic modulation during specific tasks. The high-frequency component (HF, 0.15∼0.4Hz) reflects momentary respiration and is mediated by the parasympathetic nervous system. The low-frequency component (LF, 0.04∼0.15Hz) has been interpreted mainly as an indicator of sympathetic influences (especially when expressed in normalized units). When the level of stress is high, the Normalized Low Frequency component (NoLF) of HRV signals is generally higher than the normal state. The difference in NoLF readings between a normal state and during a task could be used to evaluate

  10. An experimental study on the effect of noise and sleep loss on human performance using the measure of TCI during NPP maintenance

    International Nuclear Information System (INIS)

    Jo, Hyun Jun

    2008-02-01

    There are various stressors in NPP maintenance, such as environmental stressors and work-related stressors. These stressors degrade human performance and increase human error. Stress has not been largely considered as a factor of human error in root cause analyses. Recently, however, regulatory bodies and research institutes have worked to manage the physical condition of the operator and improve the environment and methods of NPP maintenance. These efforts have focused on reducing the incidence of human error due to stress. It is necessary to study how much stress affects human performance before these efforts are complete. The objectives of the present study are to formulate a Task Concentration Index (TCI) based on Electrocardiogram (ECG) signals in order to evaluate the degree to which a person concentrates on a task experimentally. With the TCI, the study will also evaluate the effects of noise and sleep loss on human performance during NPP maintenance tasks. Stress influences the efficiency of information processing and data input and output. Stress and human error are tightly linked in a closed-loop combination. The human body responds to stress by activating the nervous system and specific hormones. Therefore, physiological signals are changed by stress. A spectral analysis of Heart Rate Variability (HRV) provides a noninvasive technique for indirectly measuring sympathetic and parasympathetic modulation during specific tasks. The high-frequency component (HF, 0.15∼0.4Hz) reflects momentary respiration and is mediated by the parasympathetic nervous system. The low-frequency component (LF, 0.04∼0.15Hz) has been interpreted mainly as an indicator of sympathetic influences (especially when expressed in normalized units). When the level of stress is high, the Normalized Low Frequency component (NoLF) of HRV signals is generally higher than the normal state. The difference in NoLF readings between a normal state and during a task could be used to evaluate

  11. QUALITY ENHANCEMENT IN MAINTENANCE PLANNING THROUGH NON-IDENTICAL FMECA APPROACHES

    Directory of Open Access Journals (Sweden)

    Nilesh Pancholi

    2017-09-01

    Full Text Available The purpose of this paper is to investigate the scope of reliability improvement of aluminium wire rolling mill. This paper addresses the performance reliability of continuous process industry of interest to many applications in maintenance planning where multi-attribute decision making (MADM approaches are very useful. The paper addresses the process of discriminating critical components through substantial shop-floor failure data. The research work narrates a method for evaluating risk priority number (RPN traditionally. Moreover, the maintainability criticality index (MCI for each failure cause of identified critical components is evaluated through two disparate MADM failure models: technique for order preference by similarity to ideal solution (TOPSIS and preference section index (PSI to overcome the limitations of more traditional approaches. The primary findings of this research work are to enhance quality in planning the maintenance activities of critical components of targeted process industry through traditional as well as non-traditional failure analysis models. The research work is focused on potential failure causes of critical components like; bearings, gears, and shafts of aluminium wire rolling mill which are commonly representing the most critical components in a large range of industrial processes including aluminium wires. The proposed work will illustrate the working lives of components and associated failures. It will help to elucidate maintenance issues of major process industries and recommended deliverable keys.

  12. Improving motor reliability in nuclear power plants: Volume 1, Performance evaluation and maintenance practices

    International Nuclear Information System (INIS)

    Subudhi, M.; Gunther, W.E.; Taylor, J.H.; Sugarman, A.C.; Sheets, M.W.

    1987-11-01

    This report constitutes the first of the three volumes under this NUREG. The report presents recommendations for developing a cost-effective program for performance evaluation and maintenance of electric motors in nuclear power plants. These recommendations are based on current industry practices, available techniques for monitoring degradation in motor components, manufacturer's recommendations, operating experience, and results from two laboratory tests on aged motors. Two laboratory test reports on a small and a large motor are presented in separate volumes of this NUREG. These provide the basis for the various functional indicators recommended for maintenance programs in this report. The overall preventive maintenance program is separated into two broad areas of activity aimed at mitigating the potential effects of equipment aging: Performance Evaluation and Equipment Maintenance. The latter involves actually maintaining the condition of the equipment while the former involves those activities undertaken to monitor degradation due to aging. These monitoring methods are further categorized into periodic testing, surveillance testing, continuous monitoring and inspections. This study focuses on the methods and procedures for performing the above activities to maintain the motors operationally ready in a nuclear facility. This includes an assessment of various functional indicators to determine their suitability for trending to monitor motor component condition. The intrusiveness of test methods and the present state-of-the-art for using the test equipment in a plant environment are discussed. In conclusion, implementation of the information provided in this report, will improve motor reliability in nuclear power plants. The study indicates the kinds of tests to conduct, how and when to conduct them, and to which motors the tests should be applied. 44 refs., 12 figs., 13 tabs

  13. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  14. Indexing the Environmental Quality Performance Based on A Fuzzy Inference Approach

    Science.gov (United States)

    Iswari, Lizda

    2018-03-01

    Environmental performance strongly deals with the quality of human life. In Indonesia, this performance is quantified through Environmental Quality Index (EQI) which consists of three indicators, i.e. river quality index, air quality index, and coverage of land cover. The current of this instrument data processing was done by averaging and weighting each index to represent the EQI at the provincial level. However, we found EQI interpretations that may contain some uncertainties and have a range of circumstances possibly less appropriate if processed under a common statistical approach. In this research, we aim to manage the indicators of EQI with a more intuitive computation technique and make some inferences related to the environmental performance in 33 provinces in Indonesia. Research was conducted in three stages of Mamdani Fuzzy Inference System (MAFIS), i.e. fuzzification, data inference, and defuzzification. Data input consists of 10 environmental parameters and the output is an index of Environmental Quality Performance (EQP). Research was applied to the environmental condition data set in 2015 and quantified the results into the scale of 0 to 100, i.e. 10 provinces at good performance with the EQP above 80 dominated by provinces in eastern part of Indonesia, 22 provinces with the EQP between 80 to 50, and one province in Java Island with the EQP below 20. This research shows that environmental quality performance can be quantified without eliminating the natures of the data set and simultaneously is able to show the environment behavior along with its spatial pattern distribution.

  15. Study on functional relationships between ergonomics indexes of manual performance

    Science.gov (United States)

    Hu, Hui-Min; Ding, Li; Chen, Shou-Ping; Yang, Chun-Xin; Yuan, Xiu-Gan

    This paper investigates functional relationships between some of the key ergonomics indexes in manual performance, and attempts to condense the ergonomics appraisal indexes system and thus evaluate hand performance wearing EVA (extravehicular activity) glove, design and improve EVA glove's performance. Four types of ergonomics indexes were studied, i.e., dexterity, tactile sensibility (TS), strength and fatigue. Two test items of insert sticks into a holes-board (ISIHB) and nuts-bolts assembly task (NBAT) were used to measure dexterity, while shape discrimination (SD) was employed for TS, and grip force (GF) for strength and fatigue. The variables measured in this investigation included accomplishing time (AT) of ISIHB and NBAT, correct rate (CR) of SD, maximal grip force (MGF), instant grip force (IGF) and endurance time of grip force (ETGF). Experiments were conducted on 31 undergraduates (eight female and 23 male) with two experiment conditions of bare-hand group and gloved hand group. Results demonstrated that dexterity and TS performance of gloved hand group declined significantly compared with those of bare-hand group (pfatigue between two conditions (p>0.05). Four effective functional relationships were developed between four pairs of ergonomics indexes in bare-hand group. In gloved hand group, in addition to above-mentioned four pairs of relationships, another formula was found, which was y^=0.02061+0.01233x ( p<0.01, dexterity and TS).

  16. New model performance index for engineering design of control systems

    Science.gov (United States)

    1970-01-01

    Performance index includes a model representing linear control-system design specifications. Based on a geometric criterion for approximation of the model by the actual system, the index can be interpreted directly in terms of the desired system response model without actually having the model's time response.

  17. The big five personality traits and individual job performance growth trajectories in maintenance and transitional job stages.

    Science.gov (United States)

    Thoresen, Carl J; Bradley, Jill C; Bliese, Paul D; Thoresen, Joseph D

    2004-10-01

    This study extends the literature on personality and job performance through the use of random coefficient modeling to test the validity of the Big Five personality traits in predicting overall sales performance and sales performance trajectories--or systematic patterns of performance growth--in 2 samples of pharmaceutical sales representatives at maintenance and transitional job stages (K. R. Murphy, 1989). In the maintenance sample, conscientiousness and extraversion were positively associated with between-person differences in total sales, whereas only conscientiousness predicted performance growth. In the transitional sample, agreeableness and openness to experience predicted overall performance differences and performance trends. All effects remained significant with job tenure statistically controlled. Possible explanations for these findings are offered, and theoretical and practical implications of findings are discussed. (c) 2004 APA, all rights reserved

  18. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  19. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  20. Organizational Culture Influence On Total Productive Maintenance (TPM and Operational Performance Using RASCH Model Analysis

    Directory of Open Access Journals (Sweden)

    Mohd Norhasni Mohd Asaad

    2014-02-01

    Full Text Available Abstract. Market globalization, competitive product and services, high economic crises are the most critical factors that influence the success of the manufacturing companies in global market. Therefore it is critical to the manufacturing companies to be efficient in production and lean tool may used to achieve that.  The most frequently used is the Total Preventive Maintenance (TPM, even though there are many studies have been conducted in relation to the TPM but there is limited research in investigating the effects of the TPM on operational performance. However, the result of the studies was not consistent, where TPM practice may have positive and negative impact on operational performance. Among the reason is the culture of the organization that influenced the implementation of TPM and operational performance. Due to that this study attempts to investigate the influence of organizational culture on the TPM implementation and operational performance.  Rasch model is used in this study due to its ability in interpreting and analyzing the ability of respondents in performing the difficult items. The online questionnaires were distributed to 63 randomly selected automotive companies located at Northern Region of Malaysia.  Results of the study revealed that the organizational culture has influenced on the successful implementation of TPM and operational performance. Therefore by the implementation of TPM in outstanding organizational culture can improve operational performance.   Keyword: Total Preventive Maintenance (TPM, Lean manufacturing, Operational performance, Organizational culture, Rasch modeldoi:10.12695/ajtm.2013.6.2.2How to cite this article:Mohd Asaad, M.N and Yusoff, R.Z. (2013. Organizational Culture Influence On Total Productive Maintenance (TPM and Operational Performance Using RASCH Model Analysis . The Asian Journal of Technology Management 6 (2: 72-81. Print ISSN: 1978-6956; Online ISSN: 2089-791X.  doi:10.12695/ajtm

  1. Predictors of weight maintenance

    NARCIS (Netherlands)

    Pasman, W.J.; Saris, W.H.M.; Westerterp-Plantenga, M.S.

    1999-01-01

    Objective: To obtain predictors of weight maintenance after a weight-loss intervention. Research Methods and Procedures: An overall analysis of data from two-long intervention studies [n = 67 women; age: 37.9±1.0 years; body weight (BW): 87.0±1.2 kg; body mass index: 32.1±0.5 kg·m-2; % body fat:

  2. The impact of preventive maintenance practices on manufacturing performance: A proposed model for SMEs in Malaysia

    Science.gov (United States)

    Lazim, Halim Mad; Taib, Che Azlan; Lamsali, Hendrik; Saleh, Mohamed Najib; Subramaniam, Chandrakantan

    2016-08-01

    Preventive maintenance (PM) plays important role to avoid or mitigate potential stoppages and disruptions of equipment or machinery from occurring in daily operations. PM emphasized total employee involvement and it is important for companies as well as Small and Medium Sized Enterprises (SMEs). SME sectors contribution to the Malaysian economy makes up 95% of the total manufacturers, however PM remain relatively lacking. The ability, reliability and effective maintenance management is highly important in order to achieve desired manufacturing performance. Therefore, organizational capability in planning, controlling, implementing and monitoring PM activities is important. Furthermore, empirical evidence on the potential impact of PM practices towards manufacturing performance with organizational capability as a moderating effect is still limited and indecisive. Henceforth, this paper aims to explore and investigate potential relationships between PM practices and manufacturing performance moderated by organizational capability in the contact of Malaysian SMEs in the manufacturing sector. Correspondently, the study intends to propose a new research framework and hypotheses to examine the abovementioned relationships. The proposed framework includes PM team, PM strategy and planned maintenance as the determinants, while organizational capability serves as the moderating variable. Manufacturing performance will be viewed in terms of innovation and financial factors. Proposed research direction and conclusion are discussed at the end of the study.

  3. Performance Based Islamic Performance Index (Study on the Bank Muamalat Indonesia and Bank Syariah Mandiri

    Directory of Open Access Journals (Sweden)

    Siti Aisjah

    2015-09-01

    Full Text Available The development of Islamic base banks in Indonesia in recent years show rapid growth. The main challenge for Islamic base banks is how to raise belief from the stakeholders. Stakeholder expectations of the Islamic banks is different from a conventional bank. Since, Islamic banks are built on basic principles of Islamic economics. Therefore, we need a tool to evaluate and measure the performance of Islamic base banks. Islamicity Performance Index is a method which can evaluate the performance of Islamic base banks not only their financial but also justice principles, halal (lawfulness, and tazkiyah (sanctification. There are six financial ratios which are measured from Islamicity Performance Index:profit sharing ratio, zakat performance ratio, equitable distribution ratio, directors-employees welfare ratio, Islamic investment versus non-Islamic investment ratio, Islamic income versus non-Islamic income. This research is intended to figure out the performance of Islamic base Bank in Indonesia based on Islamicity Performance Index. The samples are the Bank Muamalat Indonesia and Bank Syariah Mandiri. Sources of data are the financial reports of Bank Muamalat Indonesia and Bank Syariah Mandiri in 2009–2010 period.The results show that the financial performance of Islamic Base Bank in Indonesia during 2009-2010 period have ”quite satisfactory level of  valuation. However, there are two unsatisfactory ratios. They are zakat performance ratio and director-employee welfare contrast ratio. It shows that zakat issued by the Islamic base bank in Indonesia is still low and the contrast of the director-employee welfare is still huge.

  4. METHODS AND TECHNIQUES OF PREDICTION OF KEY PERFORMANCE INDICATORS FOR IMPLEMENTATION OF CHANGES IN MAINTENANCE ORGANISATION

    Directory of Open Access Journals (Sweden)

    Andrzej WIECZOREK

    2012-01-01

    Full Text Available The article presents the concept of how to assess the future state of the organization in the area of using and maintenance of technical means, basing on the combination of "classic" prognostic model with models ‐ components of the selected computer tools. Presentation of this concept was preceded by the definition and characteristics of maintenance key performance indicators. It also presents a requirements and method of KPIs selection.

  5. Performance Evaluation and Market Timing: the Skill Index

    Directory of Open Access Journals (Sweden)

    Ney Roberto Otoni de Brito

    2003-01-01

    Full Text Available MERTON (1981 examines the creation of value by fund managers selecting between stocks and fixed income instruments through market timing. HENRIKSON and MERTON (1981 proceed to propose empirical tests of funds and manager performance in market timing. BRITO, BONA and TACIRO (2003 generalize the results of MERTON (1981 and HENRIKSON and MERTON (1981 for actively managed funds with a clearly defined benchmark portfolio. In the generalized context of active portfolio management, this paper proposes a new index – the Skill Index of Brito (SIB – to measure the performance and efficiency in market timing of actively managed funds. The paper proceeds to test the performance and skill of hedge funds in Brazil using the SIB. A representative sample of 32 hedge funds with a window of 90 trading days on October 31, 1999 was obtained. The empirical tests of performance and skill use the interbank borrowing and lending rate as the passive benchmark. The results indicate the significance at the 5% level of the SIB for ten hedge funds in the sample. Among them seven funds also have shown significance at the 1% level. In sum the results indicate a majority of hedge funds with no significant skill in the Brazilian market in the examined period.

  6. The utilization of performance evaluation instruments by technical trainers to evaluate maintenance personnel in the nuclear power industry in the United States

    International Nuclear Information System (INIS)

    Hornberger, C.K.

    1993-01-01

    The purpose of this study was to document the utilization of performance evaluation instruments by technical trainers in the evaluation of maintenance personnel in US nuclear power plants. Performance evaluation of maintenance personnel has been identified by nuclear utilities and the Nuclear Regulatory Commission as the only acceptable method of determining worker competence. The NRC requires performance evaluation to be conducted to performance standards, but it does not specify the standards or the method to be utilized. Each plant is free to establish its own standards and methods of evaluation. This was a descriptive study utilizing descriptive statistics for the analysis of the data. The subjects included 655 maintenance trainers in 72 US nuclear plants. Conclusions of the study include: (1) Technical trainers are in compliance with NRC regulations. (2) Evaluation materials developed by the Institute of Nuclear Power Operations are used by technical trainers in every one of the 62 plants that responded. (3) In-plant or self-developed Performance Evaluation Instruments are utilized by 419 or 95.2% of the technical trainers. (4) Technical trainers incorporate nine common components into their Performance Evaluation Instruments. (5) Technical trainers evaluate maintenance processes and the product produced by workers when following procedures and specifications are critical and when safety hazards are involved. (6) Technical trainers believe that utilizing Performance Evaluation Instruments makes their job easier by providing documentation about the quality and standards of maintenance skills. (7) Technical trainers believe that maintenance workers benefit when their skills are assessed through the use of Performance Evaluation Instruments

  7. Quality upgrading and cost reducing effects of using an operation control system for performance of maintenance tasks

    International Nuclear Information System (INIS)

    Ramler, K.

    1996-01-01

    According to available results, the use of an operation control system has come up to expections with respect to a quality enhancement of maintenance work. The tasks are performed more safely and there is more insight into the processes. so that, as indirect results, cost savings and rationalisation effects are to be expected. However, the cost savings achieved through the operation control system for maintenance tasks will remain modest. The truly cost-effective optimisation potentials in the maintenance area primarily consist in a reduction of preventive measures to the required scope, i.e reduction of the envisaged quantity of processes for maintenance and recurrent inspection. In order to extend savings to the organisational level, with respect to personnel expenditure, by DP supported maintenance planning, a suitable optimisation of the organisational structure and personnel employment is inevitable, because otherwise the rationalisation potentials will remain utopia. (orig.) [de

  8. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  9. Better state-of-good-repair indicators for the transportation performance index.

    Science.gov (United States)

    2014-07-01

    The Transportation Performance Index was developed for the US Chamber of Commerce to track the : performance of transportation infrastructure over time and explore the connection between economic : health and infrastructure performance. This project ...

  10. Performance-based maintenance procurement by Dutch housing associations - Working paper ¿

    NARCIS (Netherlands)

    Straub, A.; van Mossel, H.J.

    2005-01-01

    Maintenance works are component services that are part of the final housing service to the tenant. Because main building maintenance works are designed each time again, it can be compared to product (service) development. With different types of cooperation with maintenance contractors, the degree

  11. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  12. Nuclear power performance and safety. V.6.: Indexes and lists

    International Nuclear Information System (INIS)

    1988-01-01

    The sixth volume of the proceedings of the international conference on nuclear power performance and safety organized by the IAEA and held in Vienna between 28 September and 2 October 1987 presents the contents of volumes 1-5, the list of Chairmen of Sessions and the Secretariat of the Conference, the list of participants, the author and transliteration indexes, the index of papers and posters by number

  13. The effect of supragingival glycine air polishing on periodontitis during maintenance therapy: a randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Hongye Lu

    2018-02-01

    Full Text Available Background Glycine air polishing has been proved to be safe, comfortable and time-saving. Whether it could substitute ultrasonic scaling to remove dental plaque biofilm during periodontal maintenance remains unclear. The purposes of this study were to evaluate the effect of supragingival glycine air polishing (SGAP on the subgingival periodontal pathogens during maintenance therapy and to check the association of periodontal pathogens and clinical parameters. Methods Twenty-three chronic periodontitis patients during their maintenance therapy were enrolled in the 12-week study. According to randomized split-mouth design, the test side was treated with SGAP (65 μm, while the control side was treated with supragingival ultrasonic scaling and polishing (SUSP with rubber cup. Clinical examination including plaque index (PLI, probing depth (PD, bleeding index (BI were performed at baseline and 12 weeks post-treatment. Sampling of the subgingival plaque at each investigational site (mesiobuccal site of the mandibular first molar was performed at baseline and 2, 4, 8, 12 weeks after maintenance treatment. Four periodontal pathogens including Porphyromonas gingivalis, Tannerella forsythia, Treponema denticola and Fusobacterium nucleatum were detected by 16S rDNA polymerase chain reaction. Results Clinical status generally improved after treatment in both groups. PLI in both groups, PD in SGAP group and bleeding on probing (% in SUSP group significantly decreased after treatment (p < 0.05. There was no significant difference of clinical parameters between two groups before and after treatment. The detection rates of P. gingivalis, T. denticola in both groups, T. forsythia in SUSP group and F. nucleatum in SGAP group decreased after maintenance treatment in both groups, although no significant difference was found, and it rebound to baseline level at 12 weeks after maintenance treatment. There was no significant difference between SGAP group and SUSP

  14. Infrastructure of the Regulatory Authority and Performance Indexes

    International Nuclear Information System (INIS)

    Velasquez, Silvia

    2001-01-01

    This presentation overviews the following issues: elements of a control regulatory program, inspections program, procedures, indexes of users performance, priorities on: registration, criteria for practices of low risk, dose levels in medical exposures, dose constraints and training of personnel. These aspects are considered in the guides prepared within ARCAL XX framework

  15. Numerical study of inventory management under various maintenance policies

    NARCIS (Netherlands)

    Poppe, J.; Basten, R.J.I.; Boute, R.N.; Lambrecht, M.R.

    2017-01-01

    Capital assets, such as manufacturing equipment, require maintenance to remain functioning. Maintenance can be performed when a component breaks down and needs replacement (i.e., corrective maintenance), or the maintenance and part replacement can be performed preventively. Preventive maintenance

  16. Modeling of preventive maintenance changes influence upon flight safety indexes

    Directory of Open Access Journals (Sweden)

    А.В. Гончаренко

    2004-03-01

    Full Text Available  It is considered a simplified model of connection between the catastrophic events flow frequency and both preventive maintenance changes periodicity and diagnosis depth of aviation equipment. It is deduced specific formulas for computing the changes and diagnostics parameters influence upon the values of both the catastrophic events flow frequency and technical-economical control factor criterion of flight safety levels.

  17. Hotspot and sampling analysis for effective maintenance and performance monitoring.

    Science.gov (United States)

    2017-05-01

    In this project, we propose two sampling methods addressing how much and where the agencies need to collect infrastraucture condition data for accurate Level-of-Maintenance (LOM) estimation in maintenance network with single type or multiple ty...

  18. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  19. Savannah River Site plan for performing maintenance in Federal Facility Agreement areas (O and M Plan)

    International Nuclear Information System (INIS)

    Morris, D.R.

    1996-01-01

    The Savannah River Site was placed on the National Priority List (NPL) in December 1989 and became subject to comprehensive remediation in accordance with CERCLA. The FFA, effective August 16, 1993, establishes the requirements for Site investigation and remediation of releases and potential releases of hazardous substances, and interim status corrective action for releases of hazardous wastes or hazardous constituents. It was determined that further direction was needed for the Operating Departments regarding operation and maintenance activities within those areas listed in the FFA. The Plan for Performing Maintenance (O and M Plan) provides this additional direction. Section 4.0 addresses the operation and maintenance activities necessary for continued operation of the facilities in areas identified as RCRA/CERCLA Units or Site Evaluation Areas. Certain types of the O and M activity could be construed as a remedial or removal action. The intent of this Plan is to provide direction for conducting operation and maintenance activities that are not intended to be remedial or removal actions. The Plan identifies the locations of the units and areas, defines intrusive O and M activities, classifies the intrusive activity as either minor or major, and identifies the requirements, approvals, and documentation necessary to perform the activity in a manner that is protective of human health and the environment; and minimizes any potential impact to any future removal and remedial actions

  20. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  1. Performance of a Water Recirculation Loop Maintenance Device and Process for the Advanced Spacesuit Water Membrane Evaporator

    Science.gov (United States)

    Rector, Tony; Steele, John W.; Bue, Grant C.; Campbell, Colin; Makinen, Janice

    2012-01-01

    A water loop maintenance device and process to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been undergoing a performance evaluation. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the water recirculation maintenance device and process is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The maintenance process further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware. This

  2. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  3. Safety Performance Index Industri Batik Tulis Berdasarkan Kriteria Majemuk

    Directory of Open Access Journals (Sweden)

    Nachnul Ansori

    2015-12-01

    Full Text Available Accident generally occurs due to the activities which is done in unsafe conditions or even unsafe behavior. These conditions can influence workers productivity. In batik industries, those workers use toxic material and work in non ergonomic atmosphere. Moreover, they also do not take care of the environment and do not use personal protective equipments (PPE. Workers at Madura batik SMEs have not fully realized the significance of occupational health and safety (OHS in their working areas. The aims of this research is to evaluate OHS performance based on the indicators of safety performance index (SPI, which is multicriteria, in that industri. The safety performance attributes were obtained from factor analysis from the previous study. The index is calculated based on the weighted evaluation results of critical behavior checklist (CBC, integrated with analytical hierarchy process (AHP. As the results, we should give priority to improve the knowledge and experience toward OHS of the workers and also improve the working environment of the Madura’s batik industries. Additionally, the performance of OHS in coloring process is also on the threshold of unsafe condition, further development on the coloring process is needed.

  4. The influence of ALN-Al gradient material gradient index on ballistic performance

    International Nuclear Information System (INIS)

    Wang Youcong; Liu Qiwen; Li Yao; Shen Qiang

    2013-01-01

    Ballistic performance of the gradient material is superior to laminated material, and gradient materials have different gradient types. Using ls-dyna to simulate the ballistic performance of ALN-AL gradient target plates which contain three gradient index (b = 1, b = 0.5, b = 2). Through Hopkinson bar numerical simulation to the target plate materials, we obtained the reflection stress wave and transmission stress wave state of gradient material to get the best gradient index. The internal stress state of gradient material is simulated by amplification processing of the target plate model. When the gradient index b is equal to 1, the gradient target plate is best of all.

  5. Refractive index engineering of high performance coupler for compact photonic integrated circuits

    Science.gov (United States)

    Liu, Lu; Zhou, Zhiping

    2017-04-01

    High performance couplers are highly desired in many applications, but the design is limited by nearly unchangeable material refractive index. To tackle this issue, refractive index engineering method is investigated, which can be realized by subwavelength grating. Subwavelength gratings are periodical structures with pitches small enough to locally synthesize the refractive index of photonic waveguides, which allows direct control of optical profile as well as easier fabrication process. This review provides an introduction to the basics of subwavelength structures and pay special attention to the design strategies of some representative examples of subwavelength grating devices, including: edge couplers, fiber-chip grating couplers, directional couplers and multimode interference couplers. Benefited from the subwavelength grating which can engineer the refractive index as well as birefringence and dispersion, these devices show better performance when compared to their conventional counterparts.

  6. Mechanisms of n-3 fatty acid-mediated development and maintenance of learning memory performance.

    Science.gov (United States)

    Su, Hui-Min

    2010-05-01

    Docosahexaenoic acid (DHA, 22:6n-3) is specifically enriched in the brain and mainly anchored in the neuronal membrane, where it is involved in the maintenance of normal neurological function. Most DHA accumulation in the brain takes place during brain development in the perinatal period. However, hippocampal DHA levels decrease with age and in the brain disorder Alzheimer's disease (AD), and this decrease is associated with reduced hippocampal-dependent spatial learning memory ability. A potential mechanism is proposed by which the n-3 fatty acids DHA and eicosapentaenoic acid (20:5n-3) aid the development and maintenance of spatial learning memory performance. The developing brain or hippocampal neurons can synthesize and take up DHA and incorporate it into membrane phospholipids, especially phosphatidylethanolamine, resulting in enhanced neurite outgrowth, synaptogenesis and neurogenesis. Exposure to n-3 fatty acids enhances synaptic plasticity by increasing long-term potentiation and synaptic protein expression to increase the dendritic spine density, number of c-Fos-positive neurons and neurogenesis in the hippocampus for learning memory processing. In aged rats, n-3 fatty acid supplementation reverses age-related changes and maintains learning memory performance. n-3 fatty acids have anti-oxidative stress, anti-inflammation, and anti-apoptosis effects, leading to neuron protection in the aged, damaged, and AD brain. Retinoid signaling may be involved in the effects of DHA on learning memory performance. Estrogen has similar effects to n-3 fatty acids on hippocampal function. It would be interesting to know if there is any interaction between DHA and estrogen so as to provide a better strategy for the development and maintenance of learning memory. Copyright 2010 Elsevier Inc. All rights reserved.

  7. The development and evaluation of programmatic performance indicators associated with maintenance at nuclear power plants

    International Nuclear Information System (INIS)

    Wreathall, J.; Fragola, J.; Appignani, P.; Burlile, G.; Shen, Y.

    1990-05-01

    This report summarizes the development and evaluation of programmatic performance indicators of maintenance. These indicators were selected by: (1) creating a formal framework of plant processes; (2) identifying features of plant behavior considered important to safety; (3) evaluating existing indicators against these features; and (4) performing statistical analyses for the selected indicators. The report recommends additional testing. 32 refs., 29 figs., 11 tabs

  8. Antecedents to Organizational Performance: Theoretical and Practical Implications for Aircraft Maintenance Officer Force Development

    Science.gov (United States)

    2015-03-26

    Aviation Course 0 MOIC- Maintenance Officer Intermediate Course 0 NATO Nuclear Surety Managemen t Course D NWOC ·Nuclear Weapons Orientation Course 0...Arnold AFB, TN which performs a ground T &E mission. I do not perform many normal duties like a 21A assigned to an operational or depot. My answers to...THESIS Presented to the Faculty Department of Operational Sciences Graduate School of Engineering and Management Air Force Institute of

  9. Black-Scholes Fuzzy Numbers as Indexes of Performance

    Directory of Open Access Journals (Sweden)

    M. R. Simonelli

    2010-01-01

    Full Text Available We use the set of propositions of some previous papers to define a fuzzy version of the Black-Scholes value where the risk free instantaneous interest intensity, the volatility and the initial stock price are fuzzy numbers whose parameters are built with statistical financial data. With our Black-Scholes fuzzy numbers we define indexes of performance varing in time. As an example, with data of the Italian Stock Exchange on MIB30, we see that in 2004 and 2006 our indexes are negative, that is, they are indexes of the refuse to invest and this refuse increased. So, on November 11, 2006 we could forecast that the market will become with more risk: the risk of loss will increase. Now, on January 25, 2010, we know that this forecast has happened. Obviously, the parameters of our Black-Scholes fuzzy numbers can be valued also with incomplete, possibilistic data. With respect to the probabilistic one, our fuzzy method is more simple and immediate to have a forecast on the financial market.

  10. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  11. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  12. A maintenance time prediction method considering ergonomics through virtual reality simulation.

    Science.gov (United States)

    Zhou, Dong; Zhou, Xin-Xin; Guo, Zi-Yue; Lv, Chuan

    2016-01-01

    Maintenance time is a critical quantitative index in maintainability prediction. An efficient maintenance time measurement methodology plays an important role in early stage of the maintainability design. While traditional way to measure the maintenance time ignores the differences between line production and maintenance action. This paper proposes a corrective MOD method considering several important ergonomics factors to predict the maintenance time. With the help of the DELMIA analysis tools, the influence coefficient of several factors are discussed to correct the MOD value and the designers can measure maintenance time by calculating the sum of the corrective MOD time of each maintenance therbligs. Finally a case study is introduced, by maintaining the virtual prototype of APU motor starter in DELMIA, designer obtains the actual maintenance time by the proposed method, and the result verifies the effectiveness and accuracy of the proposed method.

  13. Enhanced human performance of utility maintenance programs

    International Nuclear Information System (INIS)

    Fresco, A.; Haber, S.; O'Brien, J.

    1993-01-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant's maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program

  14. The human factor in maintenance work

    International Nuclear Information System (INIS)

    Hansson, B.

    1996-01-01

    In most of the maintenance works performed at operating plants, the personnel is the warranty for both efficient performance and good quality. To reach the right quality level in performance, the personnel needs adequate tools and of course a maintenance strategy and an organisation that supports the efficient work. The human factor is mostly referred to when something went wrong and analyses are done. There is a great potential of doing preventive analysis. The presentation will focus on experience in this field and what has been done at Barsebaeck NPP to analyse and improve the maintenance work. As maintenance work can't be seen as an isolated area, the rest of the plant organisation is included in the presentation. (author) figs., tabs

  15. A refined index of model performance: a rejoinder

    Science.gov (United States)

    Legates, David R.; McCabe, Gregory J.

    2013-01-01

    Willmott et al. [Willmott CJ, Robeson SM, Matsuura K. 2012. A refined index of model performance. International Journal of Climatology, forthcoming. DOI:10.1002/joc.2419.] recently suggest a refined index of model performance (dr) that they purport to be superior to other methods. Their refined index ranges from − 1.0 to 1.0 to resemble a correlation coefficient, but it is merely a linear rescaling of our modified coefficient of efficiency (E1) over the positive portion of the domain of dr. We disagree with Willmott et al. (2012) that dr provides a better interpretation; rather, E1 is more easily interpreted such that a value of E1 = 1.0 indicates a perfect model (no errors) while E1 = 0.0 indicates a model that is no better than the baseline comparison (usually the observed mean). Negative values of E1 (and, for that matter, dr McCabe [Legates DR, McCabe GJ. 1999. Evaluating the use of “goodness-of-fit” measures in hydrologic and hydroclimatic model validation. Water Resources Research 35(1): 233-241.] and Schaefli and Gupta [Schaefli B, Gupta HV. 2007. Do Nash values have value? Hydrological Processes 21: 2075-2080. DOI: 10.1002/hyp.6825.]. This important discussion focuses on the appropriate baseline comparison to use, and why the observed mean often may be an inadequate choice for model evaluation and development. 

  16. Costs of performance based maintenance for local roads: Case study Albania

    OpenAIRE

    Jokanović Igor; Grujić Bojana; Zeljić Dragana; Grujić Žarko; Svilar Mila

    2017-01-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inade...

  17. The Doppler echocardiographic myocardial performance index predicts left-ventricular dilation and cardiac death after myocardial infarction

    DEFF Research Database (Denmark)

    Møller, J E; Søndergaard, E; Poulsen, S H

    2001-01-01

    To investigate the value of the Doppler-derived myocardial performance index to predict early left-ventricular (LV) dilation and cardiac death after a first acute myocardial infarction (AMI), Doppler echocardiography was performed within 24 h of hospital admission, on day 5, 1 and 3 months after...... AMI in 125 consecutive patients. The index measured on day 1 correlated well with the change in end-diastolic volume index observed from day 1 to 3 months following AMI (r = 0.66, p 0.0001). One-year survival in patients with Doppler index index > or = 0......, we conclude that the Doppler echocardiographic myocardial performance index is a predictor of LV dilation and cardiac death after a first AMI....

  18. Integrated fuzzy analytic hierarchy process and VIKOR method in the prioritization of pavement maintenance activities

    Directory of Open Access Journals (Sweden)

    Peyman Babashamsi

    2016-03-01

    Full Text Available Maintenance activities and pavement rehabilitation require the allocation of massive finances. Yet due to budget shortfalls, stakeholders and decision-makers must prioritize projects in maintenance and rehabilitation. This article addresses the prioritization of pavement maintenance alternatives by integrating the fuzzy analytic hierarchy process (AHP with the VIKOR method (which stands for ‘VlseKriterijumska Optimizacija I Kompromisno Resenje,’ meaning multi-criteria optimization and compromise solution for the process of multi-criteria decision analysis (MCDA by considering various pavement network indices. The indices selected include the pavement condition index (PCI, traffic congestion, pavement width, improvement and maintenance costs, and the time required to operate. In order to determine the weights of the indices, the fuzzy AHP is used. Subsequently, the alternatives’ priorities are ranked according to the indices weighted with the VIKOR model. The choice of these two independent methods was motivated by the fact that integrating fuzzy AHP with the VIKOR model can assist decision makers with solving MCDA problems. The case study was conducted on a pavement network within the same particular region in Tehran; three main streets were chosen that have an empirically higher maintenance demand. The most significant factors were evaluated and the project with the highest priority was selected for urgent maintenance. By comparing the index values of the alternative priorities, Delavaran Blvd. was revealed to have higher priority over the other streets in terms of maintenance and rehabilitation activities. Keywords: Maintenance and rehabilitation prioritization, Fuzzy analysis hierarchy process, VIKOR model, Pavement condition index, Multi-criteria decision analysis

  19. Development and performance evaluation of a prototype system for prediction of the group error at the maintenance work

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko

    2000-01-01

    In order to attain zero-izing of much more error rather than it can set to a nuclear power plant, Authors development and its system-izing of the error prediction causal model which predicts group error action at the time of maintenance work were performed. This prototype system has the following feature. (1) When a user inputs the existence and the grade of the existence of the 'feature factor of the maintenance work' as a prediction object, 'an organization and an organization factor', and a 'group PSF (Performance Shaping Factor) factor' into this system. The maintenance group error to target can be predicted through the prediction model which consists of a class of seven stages. (2) This system by utilizing the information on a prediction result database, it can use not only for prediction of a maintenance group error but for various safe activity, such as KYT (dangerous forecast training) and TBM (Tool Box Meeting). (3) This system predicts a cooperation error' at highest rate, and, subsequently predicts the detection error' at a high rate. And to the 'decision-making error', the transfer error' and the 'state cognitive error', it has the characteristic predicted at almost same rate. (4) If it has full knowledge even of the features, such as the enforcement conditions of maintenance work, and organization, even if the user has neither the knowledge about a human factor, nor experience, anyone of this system is slight about the existence, its extent, etc. of generating of a maintenance group error made difficult from the former logically and systematically easily, it can predict in business time for about 15 minutes. (author)

  20. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  1. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  2. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  3. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  4. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  5. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    Science.gov (United States)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  6. Economic evaluation of maintenance strategies for steam generator tubes using probabilistic fracture mechanics and financial method

    International Nuclear Information System (INIS)

    Sagisaka, Mitsuyuki; Isobe, Yoshihiro; Yoshimura, Shinobu; Yagawa, Genki

    2004-01-01

    As an application of probabilistic fracture mechanics (PFM) and a financial method, risk-benefit analyses were performed for the purpose of optimizing maintenance activities of steam generator (SG) tubes used in pressurized water reactors (PWRs). Parameters such as in-service inspection (ISI) detection accuracy, ISI interval, sampling inspection, replacement of SGs and stress corrosion cracking (SCC) allowance operation were selected for sensitivity analyses. In the analysis of the operation introducing maintenance criteria, the effect of quantitative accuracy of the inspection was also taken into account. Although the analyses were mainly conducted for SG tubes made of Inconel 600 mill anneal (MA) materials, the analyses were also performed for SCC-resistant materials with making assumptions on their crack initiation probabilities and crack propagation laws. To justify whether or not it is worth while implementing the selected maintenance strategies in terms of an economic point of view, net present value (NPV) was calculated as an index which is one of the most fundamental financial indices for decision-making based on the discounted cash flow (DCF) method. (author)

  7. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  8. Reliability centered maintenance : a case study of railway transit maintenance to achieve optimal performance.

    Science.gov (United States)

    2010-12-01

    The purpose of this qualitative case study was to identify the types of obstacles and patterns experienced by a single heavy rail transit agency located in North America that embedded a Reliability Centered Maintenance (RCM) Process. The outcome of t...

  9. Effects of Maintenance on Quality of Performance of Cryotherapy Devices for Treatment of Precancerous Cervical Lesions.

    Science.gov (United States)

    Maza, Mauricio; Figueroa, Ruben; Laskow, Bari; Juárez, Alexa; Alfaro, Karla; Alonzo, Todd A; Felix, Juan C; Gage, Julia C; Cremer, Miriam

    2018-01-01

    The aim of the study was to evaluate the impact of maintenance on performance of cryosurgical equipment used in El Salvador primary health clinics. Nine gynecological cryotherapy devices used in El Salvador were bench tested against a new machine of the same make and model. The devices were run for five successive double-freeze cycles. The El Salvador machines then received maintenance by a specialized engineer and another double-freeze cycle was performed. Temperature at the device probe tip was recorded throughout each cycle and ballistic gelatin was used as the tissue analogue to measure freeze ball dimensions achieved by the devices. Outcome measures were mean lowest-sustained temperatures and freeze ball mean weight, depth, and diameter. Paired and unpaired t tests were used to compare results premaintenance versus postmaintenance and postmaintenance versus the reference, respectively. Premaintenance versus postmaintenance freeze ball dimensions were significantly different (mean differences in weight = 2.31 g, p = .01; depth = 2.29 mm, p = .03; diameter = 3.51 mm, p = .02). However, postmaintenance dimensions were not significantly different than those of the reference (weight = 7.44 g vs. 8.39 g, p = .07; depth = 10.71 vs. 11.24 mm, p = .1; diameter = 31.38 mm vs. 32.05 mm, p = .3). Postmaintenance, minimum, and lowest-sustained temperatures were within the recommended clinical range. Specialized maintenance was necessary for heavily used cryotherapy devices to perform adequately, highlighting the challenges of gas-based cryotherapy in low- and middle-income countries.

  10. A multilateral modelling of Youth Soccer Performance Index (YSPI)

    Science.gov (United States)

    Bisyri Husin Musawi Maliki, Ahmad; Razali Abdullah, Mohamad; Juahir, Hafizan; Abdullah, Farhana; Ain Shahirah Abdullah, Nurul; Muazu Musa, Rabiu; Musliha Mat-Rasid, Siti; Adnan, Aleesha; Azura Kosni, Norlaila; Muhamad, Wan Siti Amalina Wan; Afiqah Mohamad Nasir, Nur

    2018-04-01

    This study aims to identify the most dominant factors that influencing performance of soccer player and to predict group performance for soccer players. A total of 184 of youth soccer players from Malaysia sport school and six soccer academy encompasses as respondence of the study. Exploratory factor analysis (EFA) and Confirmatory factor analysis (CFA) were computed to identify the most dominant factors whereas reducing the initial 26 parameters with recommended >0.5 of factor loading. Meanwhile, prediction of the soccer performance was predicted by regression model. CFA revealed that sit and reach, vertical jump, VO2max, age, weight, height, sitting height, calf circumference (cc), medial upper arm circumference (muac), maturation, bicep, triceps, subscapular, suprailiac, 5M, 10M, and 20M speed were the most dominant factors. Further index analysis forming Youth Soccer Performance Index (YSPI) resulting by categorizing three groups namely, high, moderate, and low. The regression model for this study was significant set as p < 0.001 and R2 is 0.8222 which explained that the model contributed a total of 82% prediction ability to predict the whole set of the variables. The significant parameters in contributing prediction of YSPI are discussed. As a conclusion, the precision of the prediction models by integrating a multilateral factor reflecting for predicting potential soccer player and hopefully can create a competitive soccer games.

  11. Teacher Evaluation: Organizational Maintenance Versus Stimulation of Improved Teaching Performance. The New Mexico Principalship Study.

    Science.gov (United States)

    Wood, Carolyn J.; Pohland, Paul A.

    Teacher evaluation procedures appear to focus on organizational maintenance aspects more heavily than on helping teachers improve their teaching performance. This conclusion was reached after a content analysis of teacher evaluation instruments used in New Mexico schools. Items focusing on the instructional role constituted only 28% of the items…

  12. Parameters affecting tooth loss during periodontal maintenance in a Greek population.

    Science.gov (United States)

    Tsami, Alexandra; Pepelassi, Eudoxie; Kodovazenitis, George; Komboli, Mado

    2009-09-01

    Investigators have evaluated predictive parameters of tooth loss during the maintenance phase (MP). The authors conducted a retrospective study to evaluate the rate of tooth loss and to explore the parameters that affect tooth loss during MP in a Greek population. A periodontist administered periodontal treatment and maintenance care to 280 participants with severe periodontitis for a mean period +/- standard deviation of 10.84 +/- 2.13 years. The periodontist recorded the following parameters for each participant: oral hygiene index level, simplified gingival index level, clinical attachment level, probing depth measurements, initial tooth prognosis, smoking status, tooth loss during active periodontal treatment and MP, and compliance with suggested maintenance visits. The authors found that total tooth loss during active treatment (n = 1,427) was greater than during MP (n = 918) and was associated with the initial tooth prognosis, tooth type group, participants' compliance with suggested maintenance visits, smoking status and acceptability of the quality of tooth restorations. Most of the teeth extracted during maintenance had an initial guarded prognosis (n = 612). Participants whose compliance was erratic had a greater risk of undergoing tooth extraction than did participants whose compliance was complete. Participants' initial tooth prognosis, tooth type, compliance with suggested maintenance visits and smoking status affected tooth loss during MP. Initial guarded prognosis and erratic compliance increased the risk of undergoing tooth extraction during maintenance. Determining predictive parameters for disease progression and tooth loss provides critical information to clinicians so that they can develop and implement rational treatment planning.

  13. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  14. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  15. Homologous mechanisms of visuospatial working memory maintenance in macaque and human: Properties and sources

    Science.gov (United States)

    Reinhart, Robert M.G.; Heitz, Richard P.; Purcell, Braden A.; Weigand, Pauline K.; Schall, Jeffrey D.; Woodman, Geoffrey F.

    2012-01-01

    Although areas of frontal cortex are thought to be critical for maintaining information in visuospatial working memory, the event-related potential (ERP) index of maintenance is found over posterior cortex in humans. In the present study, we reconcile these seemingly contradictory findings. Here we show that macaque monkeys and humans exhibit the same posterior ERP signature of working memory maintenance that predicts the precision of the memory-based behavioral responses. In addition, we show that the specific pattern of rhythmic oscillations in the alpha band, recently demonstrated to underlie the human visual working memory ERP component, is also present in monkeys. Next, we concurrently recorded intracranial local field potentials from two prefrontal and another frontal cortical area to determine their contribution to the surface potential indexing maintenance. The local fields in the two prefrontal areas, but not the cortex immediately posterior, exhibited amplitude modulations, timing, and relationships to behavior indicating that they contribute to the generation of the surface ERP component measured from the distal posterior electrodes. Rhythmic neural activity in the theta and gamma bands during maintenance provided converging support for the engagement of the same brain regions. These findings demonstrate that nonhuman primates have homologous electrophysiological signatures of visuospatial working memory to those of humans and that a distributed neural network, including frontal areas, underlies the posterior ERP index of visuospatial working memory maintenance. PMID:22649249

  16. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  17. Implementation of Total Productive Maintenance (TPM to Improve Sheeter Machine Performance

    Directory of Open Access Journals (Sweden)

    Candra Nofri Eka

    2017-01-01

    Full Text Available This paper purpose is an evaluation of TPM implementation, as a case study at sheeter machine cut size line 5 finishing department, PT RAPP, Indonesia. Research methodology collected the Overall Equipment Effectiveness (OEE data of sheeter machine and computed its scores. Then, OEE analysis big losses, statistical analysis using SPSS 20 and focused maintenance evaluation of TPM were performed. The data collected to machine sheeter’s production for 10 months (January-October 2016. The data analyses was resulted the OEE average score of 82.75%. This score was still below the world class OEE (85% and the company target (90%. Based the big losses of OEE analysis was obtained the reduce speed losses, which most significant losses of OEE scores. The reduce speed losses value was 44.79% of total losses during the research period. The high score of these losses due to decreasing of machine production speed by operators, which intended to improve the quality of resulting products. The OEE scores statistical analysis was found breakdown losses and reduces speed losses, which significantly affected to OEE scores. Implementations of focused maintenance of TPM in the case study may need to improve because there were still occurred un-expecting losses during the research period.

  18. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  19. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  20. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  2. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  3. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    Maier, Loran

    2003-01-01

    The Maintenance Proficiency Evaluation Test Bank (MPETB) is an Electric Power Research Institute- (EPRJ-) operated, utility-sponsored means of developing, maintaining, and disseminating secure, high-quality written and performance maintenance proficiency tests. EPRTs charter is to ensure that all tests and test items that go into the Test Bank have been validated, screened for reliability, and evaluated to high standards of psychometric excellence. Proficiency tests of maintenance personnel.(mechanics, electricians, and instrumentation and control [I and C] technicians) are most often used to determine if an experienced employee is capable of performing maintenance tasks without further training. Such tests provide objective evidence for decisions to exempt an employee from what, for the employee, is unnecessary training. This leads to considerable savings in training costs and increased productivity because supervisors can assign personnel to tasks at which their competence is proven. The ultimate objective of proficiency evaluation is to ensure that qualified maintenance personnel are available to meet the maintenance requirements of the plant Numerous task-specific MPE tests (both written and performance) have been developed and validated using the EPRI MPE methodology by the utilities participating in the MPETB project A task-specific MPE consists of a multiple-choice written examination and a multi-step performance evaluation that can be used to assess an individual's present knowledge and skill level for a given maintenance task. The MPETB contains MPEs and test items for the mechanical, electrical, and I and C classifications that are readily available to participating utilities. Presently, utilities are placing emphasis on developing MPEs to evaluate outage-related maintenance tasks that demonstrate the competency and qualifications of plant and contractor personnel before the start of outage work. Utilities are also using the MPE methodology and process to

  4. Achieving world class maintenance status

    Energy Technology Data Exchange (ETDEWEB)

    Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

    2007-08-15

    The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

  5. Early implementation of the Maintenance Rule

    International Nuclear Information System (INIS)

    Green, J.R.

    1995-01-01

    On July 10, 1991, the U.S. Nuclear Regulatory Commission (NRC) published the Maintenance Rule as Section 50.65 of 10 CFR 50. The purpose of the Maintenance Rule is to ensure that the effectiveness of maintenance activities is assessed on an ongoing basis in a manner that ensures key structures, systems, and components are capable of performing their intended function. Full implementation of the rule is required by July 10, 1996. On May 31, 1994, the NRC published Generic Letter 94-01, which allowed removal of technical specification accelerated testing and special reporting requirements for emergency diesel generators provided a program is implemented for monitoring and maintaining emergency diesel generator performance consistent with the provisions of the Maintenance Rule

  6. Development of multi-functional streetscape green infrastructure using a performance index approach

    International Nuclear Information System (INIS)

    Tiwary, A.; Williams, I.D.; Heidrich, O.; Namdeo, A.; Bandaru, V.; Calfapietra, C.

    2016-01-01

    This paper presents a performance evaluation framework for streetscape vegetation. A performance index (PI) is conceived using the following seven traits, specific to the street environments – Pollution Flux Potential (PFP), Carbon Sequestration Potential (CSP), Thermal Comfort Potential (TCP), Noise Attenuation Potential (NAP), Biomass Energy Potential (BEP), Environmental Stress Tolerance (EST) and Crown Projection Factor (CPF). Its application is demonstrated through a case study using fifteen street vegetation species from the UK, utilising a combination of direct field measurements and inventoried literature data. Our results indicate greater preference to small-to-medium size trees and evergreen shrubs over larger trees for streetscaping. The proposed PI approach can be potentially applied two-fold: one, for evaluation of the performance of the existing street vegetation, facilitating the prospects for further improving them through management strategies and better species selection; two, for planning new streetscapes and multi-functional biomass as part of extending the green urban infrastructure. - Highlights: • A performance evaluation framework for streetscape vegetation is presented. • Seven traits, relevant to street vegetation, are included in a performance index (PI). • The PI approach is applied to quantify and rank fifteen street vegetation species. • Medium size trees and evergreen shrubs are found more favourable for streetscapes. • The PI offers a metric for developing sustainable streetscape green infrastructure. - A performance index is developed and applied to fifteen vegetation species indicating greater preference to medium size trees and evergreen shrubs for streetscaping.

  7. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength and stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation

  8. Air Force Maintenance Technician Performance Measurement.

    Science.gov (United States)

    1979-12-28

    aMbr) ATTACHED DD , . - , .147-3 ",, EDITIoN o Fo NOV 66 IS O SOLETE 8,C) 9iCLAS S I r! ABSTRA CT Title: AIR FORCE MAINTENANCE T-,-NIIAN PERFCRMANCZ M...directions have 43 been edited to c’-nf:rm to Uhrbrock’s (1961) rules for a-zraisai forms, i.e., thoup-hts are expressed clearly and si-z!y, staze- ments...Yillarl, -Iheed 19 ,4., F. 1-ut .h ..s, ar .L . ’I’t-.man- -...." , e 3reakthrough for ?erfcrmance .- aisa !." 3usiness Horizons, 1076, 1, 66-73. Yiner, J

  9. Reliability Centered Maintenance (RCM) Methodology and Application to the Shutdown Cooling System for APR-1400 Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Faragalla, Mohamed M.; Emmanuel, Efenji; Alhammadi, Ibrahim; Awwal, Arigi M.; Lee, Yong Kwan [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2016-10-15

    Shutdown Cooling System (SCS) is a safety-related system that is used in conjunction with the Main Steam and Main or Auxiliary Feedwater Systems to reduce the temperature of the Reactor Coolant System (RCS) in post shutdown periods from the hot shutdown operating temperature to the refueling temperature. In this paper RCM methodology is applied to (SCS). RCM analysis is performed based on evaluation of Failure Modes Effects and Criticality Analysis (FME and CA) on the component, system and plant. The Logic Tree Analysis (LTA) is used to determine the optimum maintenance tasks. The main objectives of RCM is the safety, preserve the System function, the cost-effective maintenance of the plant components and increase the reliability and availability value. The RCM methodology is useful for improving the equipment reliability by strengthening the management of equipment condition, and leads to a significant decrease in the number of periodical maintenance, extended maintenance cycle, longer useful life of equipment, and decrease in overall maintenance cost. It also focuses on the safety of the system by assigning criticality index to the various components and further selecting maintenance activities based on the risk of failure involved. Therefore, it can be said that RCM introduces a maintenance plan designed for maximum safety in an economical manner and making the system more reliable. For the SCP, increasing the number of condition monitoring tasks will improve the availability of the SCP. It is recommended to reduce the number of periodic maintenance activities.

  10. Remote maintenance development

    International Nuclear Information System (INIS)

    Zook, C.R.

    1979-01-01

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics

  11. Fast Flux Test Facility (FFTF) maintenance provisions

    International Nuclear Information System (INIS)

    Marshall, J.L.

    1981-05-01

    The Fast Flux Test Facility (FFTF) was designed with maintainability as a primary parameter, and facilities and provisions were designed into the plant to accommodate the maintenance function. This paper describes the FFTF and its systems. Special maintenance equipment and facilities for performing maintenance on radioactive components are discussed. Maintenance provisions designed into the plant to enhance maintainability are also described

  12. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    OpenAIRE

    Tiong Kung Leong; Norhayati Zakuan; Muhamad Zameri Mat Saman; Mohd. Shoki Md. Ariff; Choy Soon Tan

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client sat...

  13. Evaluation of logistic performance indexes of Brazil in the international trade.

    Directory of Open Access Journals (Sweden)

    Rosane Nunes de Faria

    2015-02-01

    Full Text Available The importance of efficient logistics for trade growth is widely acknowledged. Literature has shown that better logistics performance is strongly associated with trade expansion, export diversification, ability to attract foreign direct investments, and economic growth. On the other hand, international trade represents a challenge to logistic operations in transporting and storing products. High logistic costs and low quality of services may be considered obstacles to international trade. This research aims to assess Brazil’s Logistics Performance Index (LPI in relation to its major competitors in international trade. The international trade data was collected from SECEX and COMTRADE, while the LPI was provided by the World Bank. Statistical techniques such as cluster analysis and multiple comparison tests of means have been applied to analyze the data. After using LPI index for the 39 competitors, it has been observed that Brazil occupies the 26th position in the rank of performers, behind South Africa, Kuwait and Saudi Arabia. The top performers are in general the leading exporters and importers worldwide (Germany, U.S.A., Japan and the Netherlands. Furthermore, they are the strongest competitors of Brazil in international trade. Thus, the competitiveness of Brazilian domestic firms depends crucially on a dynamic and competitive internal logistic environment in order to stand up to these countries. The results also indicate the bureaucracy as a major obstacle to the logistic performance of the country. The dimension Timeliness of Brazil is very close to the High Logistics Performance Group (HLPG while Customs is very close to the Low Logistics Performance Group (LLPG. Although Brazil has failed in its customs operations, there seems to be more credibility in Brazilian dealings. The main contribution of this paper is to reveal logistical aspects in which Brazil has shown large inefficiencies. The difference among the logistic performance

  14. Implementation of maintenance rule for structures

    International Nuclear Information System (INIS)

    Ashar, H.; Bagchi, G.

    1999-01-01

    The maintenance rule, 10 CFR 50.65, 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants', was published by the Nuclear Regulatory Commission (NRC) in the Federal Register (56 FR 31324) on July 10, 1991. The rule became effective on July 10, 1996, giving nuclear power plant licensees 5 years to implement it. During 1994-1995, NRC staff visited nine nuclear power plant sites to observe licensees' preparations for implementation of the rule. The teams found that most of the licensees had not established goals, or performance criteria for monitoring structures at their sites. The licensees contended that the structures were inherently reliable and required no monitoring under the maintenance rule. On the basis of earlier site visits performed by NRC staff to assess the condition of structures, the NRC staff could not accept this contention, and clarified its position in Revision 1 of Regulatory Guide 1.160, 'Monitoring the Effectiveness of Maintenance at Nuclear Power Plants'. This paper discusses the applicability of the maintenance rule criteria for structures and its usefulness in ensuring that the structures, systems, and components within the scope of the maintenance rule are capable of fulfilling their intended functions. Also discussed are the aspects of maintenance rule efforts that could be useful for license renewal applications. (orig.)

  15. Empirical analysis of selected nuclear power plant maintenance factors and plant safety

    International Nuclear Information System (INIS)

    Olson, J.; Osborn, R.N.; Thurber, J.A.; Sommers, P.E.; Jackson, D.H.

    1985-07-01

    This report contains a statistical analysis of the relationship between selected aspects of nuclear power plant maintenance programs and safety related performance. The report identifies a large number of maintenance resources which can be expected to influence maintenance performance and subsequent plant safety performance. The resources for which data were readily available were related statistically to two sets of performance indicators: maintenance intermediate safety indicators and final safety performance indicators. The results show that the administrative structure of the plant maintenance program is a significant predictor of performance on both sets of indicators

  16. [Maintenance care for dental implant].

    Science.gov (United States)

    Kamoi, K

    1989-10-01

    Dental implant has tried at the early stage in 19th century recovering an oral function and esthetics. Technological revolutions in biochemical and new materials have developed on the remarkable change in the dental implants, nowadays we call the three generation therapy for dental implantology. There are many kinds of methods and techniques in dental implants, however a lot of troublesome complication on the process of surgical phase, construction of prothodontics and prognosis of maintenance care. In the proceedings of this symposium, I would like to propose you how to manage the maintenance care for various kind of dental implants through the methodology and case presentations. Tendenay and future for dental implants The current outlook of dental implant has increasing supply and demand not only dentists but also patients. According to Japanese Welfare Ministry's report in 1987, average missing teeth over sixty years old generations are approximately 42% in accordance with NIDR (U.S.A.) research. They are missed on ten over teeth in full 28th teeth dentitions owing to dental caries and periodontal diseases. Generally speaking, latent implant patients are occupied on the same possibility of needs for dental implants both Japan and U.S.A. Management of maintenance care The patients hardly recognized the importance of plaque control for the maintenance care in the intraoral condition after implantation. Dentists and dental staffs must be instruct patients for importance of plaque removal and control, because they already had forgotten the habit of teeth cleaning, especially in the edenturous conditions. 1) Concept of establishment in oral hygiene. Motivation and instruction for patients include very important factors in dental implants as well as in periodontal diseases. Patients who could not achieve on good oral hygiene levels obtained no good results in the long term observations. To establish good oral hygiene are how to control supra plaque surrounding tissues

  17. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  18. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  19. The development and evaluation of programmatic performance indicators associated with maintenance at nuclear power plants

    International Nuclear Information System (INIS)

    Wreathall, J.; Fragola, J.; Appignani, P.; Burlile, G.; Shen, Y.

    1990-05-01

    This report summarizes the development and evaluation of programmatic performance indicators of maintenance. These indicators were selected by: (1) creating a formal framework of plant processes; (2) identifying features of plant behavior considered important to safety; (3) evaluating existing indicators against these features; and (4) performing statistical analyses for the selected indicators. The report recommends additional testing. This document provides the appendices to the report. These appendices are: synopsis of process model; detailed results of statistical analysis; and signal processing analysis of daily power loss indicator

  20. Weight loss maintenance in overweight subjects on ad libitum diets with high or low protein content and glycemic index

    DEFF Research Database (Denmark)

    Aller, E E J G; Larsen, Thomas Meinert; Holst, Claus

    2014-01-01

    Background:A high dietary protein (P) content and low glycemic index (GI) have been suggested to be beneficial for weight management, but long-term studies are scarce.Objective:The DIOGENES randomized clinical trial investigated the effect of P and GI on weight loss maintenance in overweight...... or obese adults in 8 centers across Europe. This study reports the 1-year results in 2 of the centers that extended the intervention to 1 year.Method:After an 8-week low calorie diet (LCD), 256 adults (BMI>27 kg/m(2)) were randomized to 5 ad libitum diets for 12 months: high P/low GI (HP/LGI), high P/high...... GI (HP/HGI), low P/low GI (LP/LGI), low P/high GI (LP/HGI) and a control diet. During the first 6 months foods were provided for free through a shop system, during the whole 12-month period subjects received guidance by a dietician. Primary outcome variable was the change in body weight over the 12...

  1. The Performance of Dow Jones Country Islamic Indexes Against Dow Jones Country Conventional Indexes in Asia and the Middle East : An Empirical Study of the Last Decade

    OpenAIRE

    Suharwardy, Zain

    2013-01-01

    This paper attempts to examine the performance of six countries spanning from Asia and the Middle East. Countries are selected from the Dow Jones Islamic Market Index and the focus is kept to only choose countries that have an active Dow Jones Islamic Market Country Index along with a parallel Dow Jones Conventional Country Index. Further break down is made by comparing the country performances to their respective Dow Jones regional index’s (Dow Jones Asia Index and the Dow Jones MENA) in ord...

  2. Effect of dobutamine on a Doppler echocardiographic index of combined systolic and diastolic performance.

    Science.gov (United States)

    Harada, K; Tamura, M; Toyono, M; Yasuoka, K

    2002-01-01

    Dobutamine stress echocardiography has become accepted in the evaluation of cardiac functional reserve. Although the Doppler-derived index of combined systolic/diastolic myocardial performance (Tei index) has been reported to be easily obtainable and useful for predicting left ventricular performance, the effect of dobutamine on the Tei index has not been determined in children. To assess the effect of dobutamine on the Tei index, 8 patients who had undergone surgery for ventricular septal defect and 7 patients who had a history of Kawasaki disease were examined. Echocardiographic recordings were obtained before and after dobutamine infusion (5 microg/kg per minute). Variables measured were transmitral flow velocities (E, A, E/A), rate-corrected mean velocity of circumferential fiber shortening (rate-corrected Vcf), and IMP. We measured isovolumic contraction time (ICT), isovolumic relaxation time (IRT), and ejection time (ET) and then calculated the Tei index using the following formula: Tei index = (ICT + IRT)/ET. Dobutamine infusion increased rate-corrected Vcf (29%, p ICT, and IRT were found to decrease during dobutamine infusion. The magnitude of the change in the ICT (-21%, p ICT/ET (-21%, p effects of inotropic stimilation on global left ventricular function.

  3. Buildings Lean Maintenance Implementation Model

    Science.gov (United States)

    Abreu, Antonio; Calado, João; Requeijo, José

    2016-11-01

    Nowadays, companies in global markets have to achieve high levels of performance and competitiveness to stay "alive".Within this assumption, the building maintenance cannot be done in a casual and improvised way due to the costs related. Starting with some discussion about lean management and building maintenance, this paper introduces a model to support the Lean Building Maintenance (LBM) approach. Finally based on a real case study from a Portuguese company, the benefits, challenges and difficulties are presented and discussed.

  4. On-Line Maintenance Methodology Development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyo Won; Kim, Jae Ho; Jae, Moo Sung [Hanyang University, Seoul (Korea, Republic of)

    2012-05-15

    Most of domestic maintenance activities for nuclear power plants are performed while overhaul. Therefore, On-Line Maintenance (OLM) is one of the proper risks informed application techniques for diffusing maintenance burden during overhaul with safety of the plant is secured. The NUMARC 93-01 (Rev.3) presents the OLM state of the art and it provides methodology. This study adopts NUMARC 93-01 (Rev.3) and present OLM. The reference component is Emergency Diesel Generator (EDG) of Ulchin 3, 4

  5. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  6. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  7. Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance

    International Nuclear Information System (INIS)

    Soro, Isaac W.; Nourelfath, Mustapha; Ait-Kadi, Daoud

    2010-01-01

    In this paper, we develop a model for evaluating the availability, the production rate and the reliability function of multi-state degraded systems subjected to minimal repairs and imperfect preventive maintenance. The status of the system is considered to degrade with use. These degradations may lead to decrease in the system efficiency. It is assumed that the system can consecutively degrade into several discrete states, which are characterized by different performance rates, ranging from perfect functioning to complete failure. The latter is observed when the degradation level reaches a certain critical threshold such as the system efficiency may decrease to an unacceptable limit. In addition, the system can fail randomly from any operational or acceptable state and can be repaired. This repair action brings the system to its previous operational state without affecting its failure rate (i.e., minimal repair). The used preventive maintenance policy suggests that if the system reaches the last acceptable degraded state, it is brought back to one of the states with higher efficiency. Considering customer demand as constant, the system is modeled as a continuous-time Markov process to assess its instantaneous and stationary performance measures. A numerical example is given to illustrate the proposed model.

  8. Easy-access Services in Low-threshold Opiate Agonist Maintenance

    DEFF Research Database (Denmark)

    Hesse, Morten; Pedersen, Mads Uffe

    2007-01-01

    Background: There is currently evidence that methadone and buprenorphine maintenance is effective in reducing substance abuse. However, it is not known whether psychosocial support improves the outcome of methadone maintenance in the absence of control measures, such as regular urine testing....... Materials and Methods: In a prospective observational study, the effectiveness of standard psychosocial support [SPS] was compared with enhanced psychosocial support [EPS]. EPS included intensive case management and drop-in centres. Subjects were administered the Addiction Severity Index before and after...... in the control group. Change in psychiatric and social problems were associated with the absence of no-shows. Discussion: Enhanced psychosocial support appeared to be effective at reducing problems associated with drug use in a low-threshold buprenorphine or methadone maintenance setting without substantial...

  9. A sonographic lesion index for Crohn's disease helps monitor changes in transmural bowel damage during therapy.

    Science.gov (United States)

    Zorzi, Francesca; Stasi, Elisa; Bevivino, Gerolamo; Scarozza, Patrizio; Biancone, Livia; Zuzzi, Sara; Rossi, Carla; Pallone, Francesco; Calabrese, Emma

    2014-12-01

    Therapeutic antibodies against tumor necrosis factor α (anti-TNF) are effective in patients with Crohn's disease (CD). Mucosal healing is a surrogate marker of efficacy, but little is known about the effects of anti-TNF agents on structural damage in the intestine. Small-intestine contrast ultrasonography (SICUS) is a valuable tool for assessing CD lesions. A new sonographic quantitative index (the sonographic lesion index for CD [SLIC]) was developed to quantify changes in CD lesions detected by SICUS. We explored whether the SLIC can be used to monitor transmural bowel damage in CD patients during anti-TNF therapy. We performed a prospective study of 29 patients with ileal or ileocolonic CD treated with anti-TNF agents; patients underwent SICUS before and after scheduled induction and maintenance therapy. To determine whether changes that can be detected by SICUS occur independently of anti-TNF therapy, 7 patients with ileal CD treated with mesalamine were enrolled as controls. A clinical response was defined as steroid-free remission, with CD activity index scores less than 150. We observed significant improvements in SLIC scores and subscores after induction and maintenance therapy with anti-TNFs, compared with before therapy. SLIC scores and subscores and index classes were improved significantly in patients with vs without clinical responses. Controls had no improvements in terms of CD activity index or SLIC scores, or index classes. Sonographic assessment using the quantitative index SLIC can be used to monitor changes in transmural bowel damage during anti-TNF therapy for CD. Copyright © 2014 AGA Institute. Published by Elsevier Inc. All rights reserved.

  10. Thermal Power Plant Performance Analysis

    CERN Document Server

    2012-01-01

    The analysis of the reliability and availability of power plants is frequently based on simple indexes that do not take into account the criticality of some failures used for availability analysis. This criticality should be evaluated based on concepts of reliability which consider the effect of a component failure on the performance of the entire plant. System reliability analysis tools provide a root-cause analysis leading to the improvement of the plant maintenance plan.   Taking in view that the power plant performance can be evaluated not only based on  thermodynamic related indexes, such as heat-rate, Thermal Power Plant Performance Analysis focuses on the presentation of reliability-based tools used to define performance of complex systems and introduces the basic concepts of reliability, maintainability and risk analysis aiming at their application as tools for power plant performance improvement, including: ·         selection of critical equipment and components, ·         defini...

  11. Maintenance strategies to reduce downtime due to machine positional errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, A.P.; Fletcher, S.

    2014-01-01

    Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014 Manufacturing strives to reduce waste and increase Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime competentely and similiarly identify the machines performance. Total productive maintenance (TPM) is a maintenance progr...

  12. MODELING A COMPUTER APPLICATION FOR MANAGEMENT OF MAINTENANCE ACTIVITIES OF UNPAVED ROADS

    Directory of Open Access Journals (Sweden)

    Ludmília de Souza Dias

    2015-08-01

    Full Text Available ABSTRACTThis study presents a contribution to the modeling of a computer application employing a method of serviceability performance for unpaved roads, aiming the management of maintenance/restoration activities of the primary surface layer. The proposed methodology consisted of field inspections during dry (April to September and rainy (October to March periods, during which objective evaluations were performed to survey of defects and their densities and degrees of severity. To aid the functional classification of analyzed road sections and the determination of the defect with major influence on the serviceability of these roads, the method of serviceability performance proposed by Silva (2009was implemented in the Visual Basic for Applications (VBA language in Microsoft Excel software. With the use of the computer application proposed it was possible to identify among the defects analyzed in field, through the index of serviceability of the sampling unit per defect type (ISUdef, which one had the greatest influence on determining the relative serviceability index per road section (IST. The results allow us to conclude that the computer application Road achieved satisfactory results, since the objective evaluation criteria applied to road sections denotes consistency regarding their serviceability.

  13. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  14. Maintenance personnel performance simulation (MAPPS) model: overview and evaluation efforts

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Ryan, T.G.

    1984-01-01

    The development of the MAPPS model has been completed and the model is currently undergoing evaluation. These efforts are addressing a number of identified issues concerning practicality, acceptability, usefulness, and validity. Preliminary analysis of the evaluation data that has been collected indicates that MAPPS will provide comprehensive and reliable data for PRA purposes and for a number of other applications. The MAPPS computer simulation model provides the user with a sophisticated tool for gaining insights into tasks performed by NPP maintenance personnel. Its wide variety of input parameters and output data makes it extremely flexible for application to a number of diverse applications. With the demonstration of favorable model evaluation results, the MAPPS model will represent a valuable source of NPP maintainer reliability data and provide PRA studies with a source of data on maintainers that has previously not existed

  15. Inequalities in maintenance of health and performance between young adult women and men in higher education.

    Science.gov (United States)

    Löve, Jesper; Dellve, Lotta; Eklöf, Mats; Hagberg, Mats

    2009-04-01

    Because of ageing populations, most high-income countries are facing an imminent scarcity of labour. Maintenance of health and performance in young adults therefore becomes a crucial prerequisite for sustainable societies. One major obstruction to this accomplishment is the striking health inequalities between young women and young men. Previously these inequalities have mainly been studied in a cross-sectional way, focusing on ill-health. In this study, we compared the prevalence of maintained health and performance between young adult women and men and the predictors for this outcome. The cohort consisted of 1266 participants from a homogenous sample of university students in Sweden. A combined assessment of self-rated 'very good' health and un-impaired performance took place at three time points (i.e. maintained health and performance). Potential predictors covered stable conditions in health-related behaviours, conditions at work/school and work-home interference. Young women had less maintained health and performance than young men. No major differences in predictors were found. However, there was a tendency for psychosocial factors to be the most important predictors, especially in women. That young women had less maintained health and performance in a homogenous sample beyond well-known differentiating factors suggests explanations other than observable structural differences between the sexes. This was also indicated by the importance attached to perceived demands, and work-home interference, especially in women. The combination of less scheduled, and more unscheduled, schoolwork (i.e. time-flexibility) negatively affected the maintenance of health and performance in our study population, suggesting a focus for future studies.

  16. Value of the Doppler index of myocardial performance in the early phase of acute myocardial infarction

    DEFF Research Database (Denmark)

    Poulsen, S H; Jensen, S E; Tei, C

    2000-01-01

    Prospective assessment of a nongeometric Doppler-derived index of combined systolic and diastolic myocardial performance was performed in 64 patients with acute myocardial infarction (MI) within 1 hour after their arrival to the hospital and in 39 age-matched healthy subjects. The index is defined...

  17. Assessment of right ventricular function by myocardial performance index in diabetic patients

    Directory of Open Access Journals (Sweden)

    Ayman Ahmed Abdelaziz

    2011-09-01

    Conclusion: Myocardial performance index is a useful noninvasive tool for the detection of early right ventricular systolic and diastolic dysfunction in diabetic patients, regardless of coexisting hypertension.

  18. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  19. Maintenance study for W-340 Waste Retrieval System

    International Nuclear Information System (INIS)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System

  20. Annual index & ranking for institutional Open Access performance

    DEFF Research Database (Denmark)

    Grigorov, Ivo

    A simple institutional index based on % of peer-review publications that are accessible through (gold and/or green) OA via the internet, can be a very powerful tool for both administrators and funders to see where their efforts and institutions rank in the global OA effort. Credible answers...... to questions like: "Who are the leaders?", "Who are the latest performers?", "What publicly-funded institutes researching into topical themes with socio-economic consequences, could do better at making their research accessible to stakeholders?" can also stimulate non-commited institutes to invest more in OA...

  1. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  2. Analyse of Maintenance Cost in ST

    CERN Document Server

    Jenssen, B W

    2001-01-01

    An analyse has been carried out in ST concerning the total costs for the division. Even though the target was the maintenance costs in ST, the global budget over has been analysed. This has been done since there is close relation between investments & consolidation and the required level for maintenance. The purpose of the analyse was to focus on maintenance cost in ST as a ratio of total maintenance costs over the replacement value of the equipment, and to make some comparisons with other industries and laboratories. Families of equipment have been defined and their corresponding ratios calculated. This first approach gives us some "quantitative" measurements. This analyse should be combined with performance indicators (more "qualitative" measurements) that are telling us how well we are performing. This will help us in defending our budget, make better priorities, and we will satisfy the requirements from our external auditors.

  3. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  4. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  5. Proving maintenance practices at France's CETIC facility

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    CETIC, a PWR maintenance testing, training and validation centre became operational in September 1986. It is designed to meet the following basic requirements: development of plant maintenance processes to reduce work time, validation of tools for use during maintenance, training and qualification of teams for performing high-technology, high-risk operations in nuclear power plants. (U.K.)

  6. INDEXING AND INDEX FUNDS

    Directory of Open Access Journals (Sweden)

    HAKAN SARITAŞ

    2013-06-01

    Full Text Available Proponents of the efficient market hypothesis believe that active portfolio management is largely wasted effort and unlikely to justify the expenses incurred. Therefore, they advocate a passive investment strategy that makes no attempt to outsmart the market. One common strategy for passive management is indexing where a fund is designed to replicate the performance of a broad-based index of stocks and bonds. Traditionally, indexing was used by institutional investors, but today, the use of index funds proliferated among individual investors. Over the years, both international and domestic index funds have disproportionately outperformed the market more than the actively managed funds have.

  7. Residual life management. Maintenance improvement

    International Nuclear Information System (INIS)

    Sainero Garcia, J.; Hevia Ruperez, F.

    1995-01-01

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme's subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  8. Fleet equipment performance measurement preventive maintenance model : final report.

    Science.gov (United States)

    2014-04-01

    The concept of preventive maintenance is very important in the effective management and deployment of : vehicle fleets. The Texas Department of Transportation (TxDOT) operates a large fleet of on-road and offroad : equipment. Newer engines and vehicl...

  9. H-Index of Astrophysicists at Raman Research Institute: Performance of Different Calculators

    Science.gov (United States)

    Meera, B. M.; Manjunath, M.

    2012-08-01

    H-index, a single number proposed by J. E. Hirsch in 2005 has gained popularity as an index number to measure the research performance of individuals, institutions, universities, etc. There are many calculators to derive the h-in dex number, such as Google Scholar, Web of Science, Scopus, etc. However, h-index can be calculated manually, provided we have access to a complete list of publications of a scientist and the number of citations received by them. It is observed that h-index for a given scientist at a ny given point of time differs from one calculator to the other. Here is an attempt to calculate the H-index of scientists of the Astronomy and Astrophysics Group at Raman Research Institute using Google Scholar Free calculator, Web of Science Paid calculator and The SAO/NASA As trophysics Data System manual calculation and comparison of the results. Application of this h- index phenomenon to the research output of RRI scientists in a group is done while keeping in mi nd Hirsch's systematic in vestigation to predict the position of a scientist using h-index in physics. It is believed that the higher the academic age of a scientist, the higher will be the h-index. An attempt is made to find whether this assumption is true with respect to the sample studied by including the superannuated scientists from Astronomy and Astrophysics Group at Raman Research Institute under the purview of this study.

  10. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  11. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  12. Good practices for cost effective maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1997-02-01

    This publication is organized around five areas that were identified by the utilities and government organizations who contributed to this report as most important to them. They are: Increasing production through maintenance activities related to improved plant material condition, reduced duration of planned outages, use of on-line maintenance and reduced frequency of forced outages; reducing workload through avoiding unnecessary regulatory burden and using reliability centered maintenance and condition monitoring; improving maintenance processes through better planning and scheduling, use of information management systems, graduated work controls, and appropriate post-maintenance testing; improving productivity through better teamwork, greater sharing of resources, and better radiation management associated with maintenance; measuring performance of maintenance activities through such tools as performance measures and benchmarking. Figs, tabs

  13. Prioritization of pavement maintenance sections using objective based Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Sarfaraz Ahmed

    2017-03-01

    Full Text Available The application of Analytic Hierarchy Process (AHP method for the prioritization of pavement maintenance sections is widespread now-a-days. Although the evaluation of pavement maintenance section through AHP method is simple, where the relative importance (on Saaty’s scale assigned to each parameter in the hierarchy varies between the experts (transportation professionals consulted, which leads to discrepancies in the final rankings of the sections’, due to the subjectivity in the process. Further, experts base their decisions solely on their experience while consideration is not given to the actual quantitative physical condition of the roads. To overcome these difficulties an objective based AHP method is proposed in this study, where pairwise comparison values are assigned based on the collected field data from a road network in Mumbai city, consisting of 28 road sections. The final ranking list of candidate sections takes into consideration the priority weight of alternatives, which reflect the road conditions. The solution of priority ratings of AHP method is compared with the corresponding solution of road condition index method, a traditional pavement maintenance procedure. The findings of the present study suggest that objective based AHP method is more suitable for the prioritization of pavement maintenance of roads. Keywords: Prioritization, Analytic Hierarchy Process, Road condition index, Objective method, Rating and ranking

  14. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  15. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  16. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  17. Measuring economic performance, social progress and sustainability using an index

    International Nuclear Information System (INIS)

    de Carvalho, Joaquim Francisco

    2011-01-01

    The energy crisis and a greater awareness among the general public regarding the issue of climate change have, between them, led to a notable increase in the interest shown by governments in relation to the problem of environmental sustainability. An example has been the initiative taken by the President of France to set up a commission, known as the Sarkozy Commission, named after the President, bringing together renowned economists to study and propose forms of economic performance measurement related to social progress. This article aims to propose a methodology to establish a quantitative definition of sustainability structured on the principles of minimum and maximum entropy production, and, based on this, outline a way of organizing the many sources of, and kinds of energy, we have available to us in order of the intensity of their respective environmental impacts. Based on this, we could produce an Environmental Sustainability Index, linked to existing statistical indicators of human development, and thereby arrive at a Sustainable Human Development Index, which would be positively or negatively influenced by parameters linked to environmental sustainability and quality of life. In order to ensure that this index can produce practical results, the WTO (World Trade Organization) would have to establish a scale of increments, to be applied to export tariffs on products originating in countries with different indexes. (author)

  18. Assessing the state of environmental quality in cities – A multi-component urban performance (EMCUP) index

    International Nuclear Information System (INIS)

    Stossel, Zeev; Kissinger, Meidad; Meir, Avinoam

    2015-01-01

    Urban environmental quality indices can provide policy makers and the public with valuable information. However, common assessment tools have several shortcomings: most indices do leave out some important components of the state of urban environmental quality; they use a relative assessment in which urban environmental performance is evaluated relative to other cities, not against established environmental benchmarks; and only a few assessment tools compare urban performance to environmental quality standards. This paper presents a new multi component urban performance (EMCUP) index aiming to tackle those shortcomings. It analyses the overall state of urban environmental quality by using a list of indicators to evaluate key urban environmental quality topics such as air, water, open space, sanitation and solid waste. It presents an absolute score calculated in relation to both the standard and desired optimum levels. The use of the index is demonstrated by three Israeli cities. - Highlights: • The index provides a new framework for analyzing the overall urban environmental quality. • The index scores are calculated based on environmental standards and desired optimum benchmark values. • The paper demonstrates the gap between the state of existing urban environmental quality and the desired goals. - Introducing a multi component urban performance (EMCUP) index, which measures urban environmental quality related to environmental benchmarks.

  19. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  20. The association between body mass index and academic performance

    OpenAIRE

    Khaled A. Alswat; Abdullah D. Al-Shehri; Tariq A. Aljuaid; Bassam A. Alzaidi; Hassan D. Alasmari

    2017-01-01

    Objectives: To examine the relation between body mass index (BMI) and the academic performance of students from Taif city, Kingdom of Saudi Arabia (KSA) using the grade point average (GPA). Method: A cross-sectional study that includes students from intermediate and high schools located in Taif city, KSA between April 2014 and June 2015. Height and weight were measured and BMI calculated. Related risk factors including dietary habits, activity, parent’s education, sleeping pattern, and sm...

  1. The association between body mass index and academic performance

    OpenAIRE

    Alswat, Khaled A.; Al-shehri, Abdullah D.; Aljuaid, Tariq A.; Alzaidi, Bassam A.; Alasmari, Hassan D.

    2017-01-01

    Objectives: To examine the relation between body mass index (BMI) and the academic performance of students from Taif city, Kingdom of Saudi Arabia (KSA) using the grade point average (GPA). Method: A cross-sectional study that includes students from intermediate and high schools located in Taif city, KSA between April 2014 and June 2015. Height and weight were measured and BMI calculated. Related risk factors including dietary habits, activity, parent?s education, sleeping pattern, and smokin...

  2. Establishment of key grid-connected performance index system for integrated PV-ES system

    Science.gov (United States)

    Li, Q.; Yuan, X. D.; Qi, Q.; Liu, H. M.

    2016-08-01

    In order to further promote integrated optimization operation of distributed new energy/ energy storage/ active load, this paper studies the integrated photovoltaic-energy storage (PV-ES) system which is connected with the distribution network, and analyzes typical structure and configuration selection for integrated PV-ES generation system. By combining practical grid- connected characteristics requirements and technology standard specification of photovoltaic generation system, this paper takes full account of energy storage system, and then proposes several new grid-connected performance indexes such as paralleled current sharing characteristic, parallel response consistency, adjusting characteristic, virtual moment of inertia characteristic, on- grid/off-grid switch characteristic, and so on. A comprehensive and feasible grid-connected performance index system is then established to support grid-connected performance testing on integrated PV-ES system.

  3. Managing sidewalk pavement maintenance: A case study to increase pedestrian safety

    Directory of Open Access Journals (Sweden)

    Maria Vittoria Corazza

    2016-06-01

    Full Text Available Comfort is a major requirement in planning pedestrian facilities. Pedestrians walk where they feel comfortable and when they do not feel at ease, they walk elsewhere. A typical example is that filthy, distressed, or too narrow sidewalks induce pedestrians to walk on carriageways. This behaviour jeopardizes road safety and highly dangerous to most users, leave them vulnerable. Unsuitable pavements can be the result of irregular maintenance operations to restore evenness after shock damage, weather phenomena, installation of equipment (e.g., posts, fences, urban furniture with a reduction of walkable surface, or substandard repair work on pavements and patches due to emergency operations. These problems can be solved with an appropriate maintenance management system, which optimizes financial resources to make smart decisions about how to intervene with an adequate and lasting maintenance operation. This paper defines an evaluation index for sidewalk conditions as a part of an efficient set-up of a Sidewalk Management System, which is similar to the better known Road Management System. The study relies on surveys, as well as the classification and analysis of sidewalk distresses. The authors adapted an index already standardized by ASTM for roads and airports: the Pavement Condition Index (PCI. PCI has been modified to consider the specific types on the sidewalks studied within this paper. To validate the method, a case study of a residential district in Rome, Italy, was carried out. The chosen area lacks regular maintenance and has therefore resulted in a network of unsafe sidewalks. Frequent detour routes were surveyed and related to the level of distresses within a general assessment of safety. This study concentrates on sidewalks with flexible pavements because this type of pavement is the only one adopted in the survey areas and, in general, throughout Italy.

  4. Plant and equipment division laboratory services series: a ten-year building-maintenance cost history

    International Nuclear Information System (INIS)

    Keesee, H.F.

    1976-09-01

    Maintaining a multifacility national laboratory in a safe, reliable condition is a complex management responsibility in terms of budgets, costs, and proper utilization of personnel and material resources. Increasing wage rates and material costs, combined with decreased budgets and aging facilities, create unusual challenges to maintenance managers. A ten-year history of building-maintenance costs, a brief description of the maintenance program, analyses of personnel requirements, cost increase indexes, unit costs, cost controls, procedures, and a brief discussion of alterations and improvements are presented

  5. How Performance-Contingent Reward Prospect Modulates Cognitive Control: Increased Cue Maintenance at the Cost of Decreased Flexibility

    Science.gov (United States)

    Hefer, Carmen; Dreisbach, Gesine

    2017-01-01

    Growing evidence suggests that reward prospect promotes cognitive stability in terms of increased context or cue maintenance. In 3 Experiments, using different versions of the AX-continuous performance task, we investigated whether this reward effect comes at the cost of decreased cognitive flexibility. Experiment 1 shows that the reward induced…

  6. Energy: Systems for Control, Maintenance, and Storage. A Bibliography.

    Science.gov (United States)

    Thomas, Gerald, Comp.; McKane, Irving, Comp.

    This publication is a bibliography of available periodical literature on specific aspects of energy and today's technology. The Applied Science and Technology Indexes were searched for articles that related to these specific areas: (1) Energy control systems; (2) Maintenance of Energy Systems; and (3) Energy storage. The articles and papers…

  7. Evaluations of maintenance effectiveness on unavailability and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1993-01-01

    A methodology is presented for quantifying the effectiveness of maintenance on unavailability and on risk. The methodology is based on standard Markov modeling principles. What is new is the application to quantify maintenance effectiveness by explicitly quantifying maintenance benefits as well as maintenance's negative contributions. Maintenance effects are quantified by defining a degraded state for the component in addition to an operational state and a failed state which are usually defined. The maintenance model which is developed is a natural extension of the standard models used in reliability analysis and in Probabilistic Risk Assessments (PRAs). The results which are obtained can be directly used in PRAs. Applications of the methodology are presented by quantifying maintenance effectiveness on component performance and component unavailability for specific maintenance schedules

  8. Effect of Glycemic Index of a Pre-exercise Meal on Endurance Exercise Performance

    NARCIS (Netherlands)

    Burdon, Catriona A.; Spronk, Inge; Cheng, Hoi Lun; O’Connor, Helen T.

    2017-01-01

    Background: Low glycemic index (GI) pre-exercise meals may enhance endurance performance by maintaining euglycemia and altering fuel utilization. However, evidence for performance benefits is equivocal. Objective: To evaluate the effect of a low GI (LGI) versus a high GI (HGI) pre-exercise meal on

  9. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  10. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Science.gov (United States)

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  11. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Directory of Open Access Journals (Sweden)

    Tiong Kung Leong

    2014-01-01

    Full Text Available This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  12. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    Science.gov (United States)

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  13. Development of multi-functional streetscape green infrastructure using a performance index approach

    Czech Academy of Sciences Publication Activity Database

    Tiwary, A.; Williams, L. D.; Heidrich, O.; Namdeo, A.; Bandaru, V.; Calfapietra, Carlo

    2016-01-01

    Roč. 208, jan (2016), s. 209-220 ISSN 0269-7491 Institutional support: RVO:67179843 Keywords : Green infrastructure * Multi-functional * Pollution * Performance index * Streetscape Subject RIV: EH - Ecology, Behaviour Impact factor: 5.099, year: 2016

  14. Proposal of an environmental performance index to assess solid waste treatment technologies

    International Nuclear Information System (INIS)

    Goulart Coelho, Hosmanny Mauro; Lange, Liséte Celina; Coelho, Lineker Max Goulart

    2012-01-01

    Highlights: ► Proposal of a new concept in waste management: Cleaner Treatment. ► Development of an index to assess quantitatively waste treatment technologies. ► Delphi Method was carried out so as to define environmental indicators. ► Environmental performance evaluation of waste-to-energy plants. - Abstract: Although the concern with sustainable development and environment protection has considerably grown in the last years it is noted that the majority of decision making models and tools are still either excessively tied to economic aspects or geared to the production process. Moreover, existing models focus on the priority steps of solid waste management, beyond waste energy recovery and disposal. So, in order to help the lack of models and tools aiming at the waste treatment and final disposal, a new concept is proposed: the Cleaner Treatment, which is based on the Cleaner Production principles. This paper focuses on the development and validation of the Cleaner Treatment Index (CTI), to assess environmental performance of waste treatment technologies based on the Cleaner Treatment concept. The index is formed by aggregation (summation or product) of several indicators that consists in operational parameters. The weights of the indicator were established by Delphi Method and Brazilian Environmental Laws. In addition, sensitivity analyses were carried out comparing both aggregation methods. Finally, index validation was carried out by applying the CTI to 10 waste-to-energy plants data. From sensitivity analysis and validation results it is possible to infer that summation model is the most suitable aggregation method. For summation method, CTI results were superior to 0.5 (in a scale from 0 to 1) for most facilities evaluated. So, this study demonstrates that CTI is a simple and robust tool to assess and compare the environmental performance of different treatment plants being an excellent quantitative tool to support Cleaner Treatment implementation.

  15. Alternative short tests for inspection and maintenance of in-use cars with respect to their emissions performance

    NARCIS (Netherlands)

    Samaras, Z.; Zachariadis, T.; Joumard, R.; Vernet, I.; Hassel, D.; Weber, F.-J.; Rijkeboer, R.C.

    1998-01-01

    This paper presents the first results of a project aimed at evaluation of a number of short tests that can be alternatively used for Inspection and Maintenance of in-use cars emissions performance. For this purpose, a large number of in-use cars from four European countries was tested according to a

  16. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  17. Self-evaluation Maintenance in Actual School Performance and School Morale among Elementary Schoolchildren(Educational Psychology)

    OpenAIRE

    磯崎, 三喜年; イソザキ, ミキトシ; Mikitoshi, ISOZAKI

    2001-01-01

    The relation between self-evaluation maintenance in school performance and school morale among elementary school children was examined. Questionnaires were administered to two hundred and fifteen (113 male, 102 female) elementary schoolchildren. They were asked to name their close classmates and school subjects which they considered both relevant and not relevant to their self-definition. They were also asked to complete the School Morale Test (SMT, Nihon Bunka Kagakusha). The SMT consists of...

  18. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  19. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  20. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  1. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    Directory of Open Access Journals (Sweden)

    Paolo Renna

    2017-03-01

    Full Text Available Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performance measures are compared with a system without any flexibility and no preventive maintenance actions. Different levels of flexibility and preventive maintenance actions are examined under a simulation environment. The simulation results highlight more important factors for the performance measures and the best combination of the factors to improve the performance.

  2. Oak Ridge Research Reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1990-10-01

    The Department of Energy ordered the Oak Ridge Research Center Reactor to be placed in permanent shutdown on July 14, 1987. Maintenance activities, both mechanical and instrument, were essentially routine in nature. The performance of the instrumentation for the facility was satisfactory, and maintenance required is provided. The performance of the process system was satisfactory, and maintenance required is indicated. The results of efficiency tests of the various gaseous-waste filters have been summarized and preparations for transfer of the facility to the remedial action program is also indicated

  3. Proactive maintenance for mechanical systems

    CERN Document Server

    Fitch, EC

    1992-01-01

    Written by Dr. E.C. Fitch, the book contains over 340 double column pages which include 400 figures and tables, a comprehensive bibliography, and index. There is no root cause of mechanical failure, known to the author, that has been ignored or left out. Nowhere in the world is this information put together in such a concise and comprehensive manner, and the book will serve as a reference and guide to designers, practising engineers, maintenance technicians, plant managers and operators who must design, maintain and operate fluid-dependent mechanical systems.

  4. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  5. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  6. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  7. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  8. Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

    Directory of Open Access Journals (Sweden)

    Alena Conrads

    2018-03-01

    Full Text Available Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined. Keywords: Mechanized tunneling, Maintenance, Wear of cutting tools, Process simulation, Robustness, Uncertainty modeling

  9. Maintenance rule: a system to guarantee maintenance effectiveness

    International Nuclear Information System (INIS)

    Torralbo, J.R.

    1995-01-01

    In the last few years, maintenance activities in nuclear plants have been given prime attention in view of their repercussion on the performance of such plants. One of the results of that attention is a new rule published in the U.S. known as M aintenance Rule . The paper describes the philosophy and main guidelines of the new regulation, and presents the procedure brought into action by the nuclear industry in Spain so to make their application contribute to a real improvement of safety and performance in nuclear plants. (Author)

  10. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  11. CH Packaging Maintenance Manual

    International Nuclear Information System (INIS)

    Washington TRU Solutions

    2002-01-01

    This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests

  12. Study on how to evaluate the effectiveness of maintenance activities for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    If we try to check the effectiveness of maintenance activities in nuclear power plant, it is necessary to evaluate plant performance from the viewpoint of nuclear safety and economy. So, in this paper, after the relation among maintenance optimization, maintenance performance targets, maintenance effectiveness indicator and maintenance key parameters important to nuclear safety and economy was made clear, a method to evaluate the effectiveness of maintenance activities was discussed. As a result of consideration, it was concluded that the maintenance effectiveness indicator proposed in this paper can evaluate maintenance effectiveness and can show the direction of improving existing maintenance program because the relation with maintenance performance target and maintenance key parameters is clear. (author)

  13. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  14. Essential Approach of Maintenance Management System of Office Building

    Directory of Open Access Journals (Sweden)

    Masyatul Husna Othman

    2013-09-01

    Full Text Available Buildings will be worn-out, dilapidated and dirty as time goes by; but with good maintenance management we can at least prolong the lifespan of building longer as well as provide the building services and keep the building performance at it ultimate level. The importance of carrying out a systematic and routine maintenance works as part of works to conserve building performance is often neglected due to various factors including due to misunderstanding on the needs of the maintenance works itself and budget allocated. Thus, the purpose of the present study was to evaluating the level of maintenance management and quality of services in office buildings. This study also sought to answer the following question to determine the basic approach of maintenance management system used for office buildings.

  15. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  16. Optimized protocols for Mycobacterium leprae strain management: frozen stock preservation and maintenance in athymic nude mice.

    Science.gov (United States)

    Trombone, Ana Paula Fávaro; Pedrini, Sílvia Cristina Barbosa; Diório, Suzana Madeira; Belone, Andréa de Faria Fernandes; Fachin, Luciana Raquel Vicenzi; do Nascimento, Dejair Caitano; Rosa, Patricia Sammarco

    2014-03-23

    Leprosy, caused by Mycobacterium leprae, is an important infectious disease that is still endemic in many countries around the world, including Brazil. There are currently no known methods for growing M. leprae in vitro, presenting a major obstacle in the study of this pathogen in the laboratory. Therefore, the maintenance and growth of M. leprae strains are preferably performed in athymic nude mice (NU-Foxn1(nu)). The laboratory conditions for using mice are readily available, easy to perform, and allow standardization and development of protocols for achieving reproducible results. In the present report, we describe a simple protocol for purification of bacilli from nude mouse footpads using trypsin, which yields a suspension with minimum cell debris and with high bacterial viability index, as determined by fluorescent microscopy. A modification to the standard method for bacillary counting by Ziehl-Neelsen staining and light microscopy is also demonstrated. Additionally, we describe a protocol for freezing and thawing bacillary stocks as an alternative protocol for maintenance and storage of M. leprae strains.

  17. Telephone Exchange Maintenance

    CERN Multimedia

    2005-01-01

    Urgent maintenance work on CERN telephone exchanges will be performed on 24 March from 6 a.m. to 8 a.m. Telephone services may be disrupted or even interrupted during this time. For more details, please contact us by email at Standard.Telephone@cern.ch.

  18. History of large scale maintenance operations performed by EDF on the steam generators of its nuclear power plants

    International Nuclear Information System (INIS)

    2010-01-01

    After a first part which describes the role of steam generators in nuclear reactors, highlights their importance for the reactor safety, and briefly presents their maintenance, this report describes the new types of degradation which have been observed, and their processing. Thus, it describes the clogging on cracked tubes, comments its impact on safety, describes the available control means, and discusses the use of chemical cleaning and the on-going work on this topic. It discusses the risk of fatigue cracking of tubes in abnormal support position. It comments the holding in position of stoppers used during maintenance. It describes and discusses the corrosion phenomena, and the performed and requested corrective actions

  19. Maintenance as a safety issue.

    Science.gov (United States)

    White, Jim

    2008-11-01

    Because safety is related to electrical power systems maintenance, it seems reasonable to assume there could be legal issues if maintenance is not performed. OSHA has not yet taken the stand that not performing maintenance as required by the manufacturer, NFPA 70B, or ANSI/NETA MTS-07 constitutes a willful violation. OSHA defines a willful citation as one where: "the employer knowingly commits with plain indifference to the law. The employer either knows that what he or she is doing constitutes a violation, or is aware that a hazardous condition existed and made no reasonable effort to eliminate it". However, NFPA 70E 2009 requires this maintenance, and OSHA has stated on its Web site that NFPA 70E is "a guide for meeting the requirements of the OSHA electrical regulations". In addition, federal courts have found that NFPA 70E is "standard industry practice." Once a company receives and accepts a willful citation, especially if received as the result of an accident investigation, its worker's compensation protection no longer shields it. One definition given by a trial attorney for a willful citation was that it is equal to negligent behavior. Be smart: Maintain that equipment and save yourself major problems, including unscheduled shutdowns and possible litigation.

  20. [Effect of the frequency of maintenance therapy on patients treated for gingivitis and incipient marginal periodontitis].

    Science.gov (United States)

    Rojas, I F; Zepeda, M S; Zúñiga, H P

    1990-11-01

    The effectiveness of maintenance care program applied at different period of time was evaluate in patients treated for gingivitis and incipiente marginal periodontitis. Fifty six patients were divided in three groups, each one controlled three times (each 2, 4 and 6 months respectively), to evaluate periodontal health. At each control, gingival index and plaque index was registered and patients had profilaxis and reinforcement of dental care instructions. All patients knew and practiced a control plaque control during active treatment. Results demonstrated that maintenance care program applied each 2 months, could get better clinical healthy periodontal conditions, without influence of patient's control plaque. Those patients with good hygiene could provide for an acceptable level of periodontal health even in patients controlled each 4 and 6 months. Positive correlations between controls in each index are indicative for that. Age seemingly do not have influence like etiological factor of recurrence inflammation. High correlation between plaque index and gingival index was found in every control mainly in the groups controlled each 4 and 6 months.

  1. Simulation based comparison of predictive maintenance policies

    NARCIS (Netherlands)

    Tinga, Tiedo; Janssen, R.H.P.; Steenbergen, R.; van Gelder, P.

    2013-01-01

    When an asset is operated in variable conditions, its operational efficiency can be improved significantly when the maintenance is performed in a dynamic manner. This means that variations in usage and operating environment are taken into account when deciding on the length of the maintenance

  2. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  3. A study on maintenance rule program and its application at Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  4. A study on maintenance rule program and its application at Korean NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project.

  5. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  6. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  7. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  8. Blood profile of proteins and steroid hormones predicts weight change after weight loss with interactions of dietary protein level and glycemic index

    DEFF Research Database (Denmark)

    Wang, Ping; Holst, Claus; Andersen, Malene R

    2011-01-01

    Weight regain after weight loss is common. In the Diogenes dietary intervention study, high protein and low glycemic index (GI) diet improved weight maintenance.......Weight regain after weight loss is common. In the Diogenes dietary intervention study, high protein and low glycemic index (GI) diet improved weight maintenance....

  9. HOW PERFORMANCE OF JAKARTA ISLAMIC INDEX (JII STOCKS RELATIVE TO OTHER STOCKS?

    Directory of Open Access Journals (Sweden)

    Erna Listyaningsih

    2015-09-01

    Full Text Available This study was conducted to assess the performance of Jakarta Islamic Index (JII stocks and also investigate whether there was an ethical effect (JII selection restriction and compare it with non-Sharia stocks. The main model used in this study was the Capital Asset Pricing Model (CAPM single index model extended to the Fama and French three factors. This study employs elaborate matching data. The data used in this study was split into two periods: the 2005-2007 periods which consists of two groups: JII and non-JII and the 2008-2012 periods which consists of three groups: JII, Sharia and non-Sharia based on industry sector. This study found that basically there was no difference on performance between JII and non-JII stocks. Therefore, this result supports the previous studies in which there were no significant differences between Sharia and conventional investment.

  10. Safety of nuclear operation and maintenance

    International Nuclear Information System (INIS)

    Mori, M.; Nitta, T.; Sakai, K.

    1994-01-01

    The Kansai Electric Power Co. Inc.(Kansai EPC) aims to pursue a high quality and highly reliable operation in nuclear power generation in order to ensure safety by reducing the risk of accidents and win the confidence from the society and the public. It is emphasised that in order to realize this aim manufacturers and contractors cooperate with each other in performing high quality maintenance through plant lifetime maintenance system. TQC (Total Quality Control) activity enhances the motivation for each individual to have a quality-oriented mind and cultivate the safety culture. Under the lifetime employment practice, Kansai EPC and maintenance contractors can conduct systematic education and training, and the Maintenance Training Center helps to make it effective. 6 figs

  11. Feasibility study of component risk ranking for plant maintenance

    International Nuclear Information System (INIS)

    Ushijima, Koji; Yonebayashi, Kenji; Narumiya, Yoshiyuki; Sakata, Kaoru; Kumano, Tetsuji

    1999-01-01

    Nuclear power is the base load electricity source in Japan, and reduction of operation and maintenance cost maintaining or improving plant safety is one of the major issues. Recently, Risk Informed Management (RIM) is focused as a solution. In this paper, the outline regarding feasibility study of component risk ranking for plant maintenance for a typical Japanese PWR plant is described. A feasibility study of component risk raking for plant maintenance optimization is performed on check valves and motor-operated valves. Risk ranking is performed in two steps using probabilistic analysis (quantitative method) for risk ranking of components, and deterministic examination (qualitative method) for component review. In this study, plant components are ranked from the viewpoint of plant safety / reliability, and the applicability for maintenance is assessed. As a result, distribution of maintenance resources using risk ranking is considered effective. (author)

  12. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  13. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  14. OPTIMALISASI KINERJA PERSEDIAAN SUKU CADANG UNTUK PELAKSANAAN MAINTENANCE REPAIR OVERHAUL (MRO DENGAN PENERAPAN COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS (CMMS (Studi Kasus di PT. Indonesia Asahan Aluminium

    Directory of Open Access Journals (Sweden)

    Sutrisno Sutrisno

    2015-04-01

    Full Text Available PT.Inalum is a manufacturing company engaged in the aluminum smelting industry. PT.Inalum pengendaliaan system requires an inventory of spare parts to conduct maintenance, repair and overhaul (MRO. CMMS (Computerized Maintenance Management System is a computerized maintenance system running on a LAN (Local Area Network. CMMS is influenced by three variables, namely an integrated maintenance, inventory and procurement so as to create a good maintenance should be supported by the inventory control of spare parts used in maintenance. CMMS aims to make the work more efficient and effective, especially in matters relating to maintenance. That as a benchmark to measure the performance of CMMs for spare parts inventory control is a key performance indicator (KPI. This study aims to evaluate and compare key performance indicators before and after implementation of CMMS for the implementation of MRO activities. Another goal to be achieved is to determine the factors that affect the value of the inventory of spare parts. Based on the results of data processing and analysis can be seen that by looking at a comparison of before and after implementation of CMMS on key performance indicators, it appears that there is an improvement in every parameter, one of which is the value of the inventory prior to the implementation of CMMS for $ 34,790,000.00 compared to after the application of the inventory value fell to $ 19,632,000.00. Factors that affect the value of the inventory is the inventory of spare parts, maintenance, procurement, and human resources.

  15. Assessment of transport performance index for urban transport development strategies — Incorporating residents' preferences

    Energy Technology Data Exchange (ETDEWEB)

    Ambarwati, Lasmini, E-mail: L.Ambarwati@tudelft.nl [Department of Transport and Planning, TU Delft (Netherlands); Department of Civil Engineering, Brawijaya University (Indonesia); Verhaeghe, Robert, E-mail: R.Verhaeghe@tudelft.nl [Department of Transport and Planning, TU Delft (Netherlands); Arem, Bart van, E-mail: B.vanArem@tudelft.nl [Department of Transport and Planning, TU Delft (Netherlands); Pel, Adam J., E-mail: A.J.Pel@tudelft.nl [Department of Transport and Planning, TU Delft (Netherlands)

    2017-03-15

    The performance of urban transport depends on a variety of factors related to metropolitan structure; in particular, the patterns of commuting, roads and public transport (PT) systems. To evaluate urban transport planning efforts, there is a need for a metric expressing the aggregate performance of the city's transport systems which should relate to residents' preferences. The existing metrics have typically focused on a measure to express the proximity of job locations to residences. A Transport Performance Index (TPI) is proposed in which the total cost of transportation system (operational and environmental costs) is divided by willingness to pay (WTP) for transport plus the willingness to accept (WTA) the environmental effects on residents. Transport operational as well as the environmental costs are derived from a simulation of all transport systems, to particular designs of spatial development. Willingness to pay for transport and willingness to accept the environmental effects are derived from surveys among residents. Simulations were modelled of Surabaya's spatial structure and public transport expansion. The results indicate that the current TPI is high, which will double by 2030. With a hypothetical polycentric city structure and adjusted job housing balance, a lower index occurs because of the improvements in urban transport performance. A low index means that the residents obtain much benefit from the alternative proposed. This illustrates the importance of residents' preferences in urban spatial planning in order to achieve efficient urban transport. Applying the index suggests that city authorities should provide fair and equitable public transport systems for suburban residents in the effort to control the phenomenon of urban sprawl. This index is certainly a good tool and prospective benchmark for measuring sustainability in relation to urban development.

  16. Assessment of transport performance index for urban transport development strategies — Incorporating residents' preferences

    International Nuclear Information System (INIS)

    Ambarwati, Lasmini; Verhaeghe, Robert; Arem, Bart van; Pel, Adam J.

    2017-01-01

    The performance of urban transport depends on a variety of factors related to metropolitan structure; in particular, the patterns of commuting, roads and public transport (PT) systems. To evaluate urban transport planning efforts, there is a need for a metric expressing the aggregate performance of the city's transport systems which should relate to residents' preferences. The existing metrics have typically focused on a measure to express the proximity of job locations to residences. A Transport Performance Index (TPI) is proposed in which the total cost of transportation system (operational and environmental costs) is divided by willingness to pay (WTP) for transport plus the willingness to accept (WTA) the environmental effects on residents. Transport operational as well as the environmental costs are derived from a simulation of all transport systems, to particular designs of spatial development. Willingness to pay for transport and willingness to accept the environmental effects are derived from surveys among residents. Simulations were modelled of Surabaya's spatial structure and public transport expansion. The results indicate that the current TPI is high, which will double by 2030. With a hypothetical polycentric city structure and adjusted job housing balance, a lower index occurs because of the improvements in urban transport performance. A low index means that the residents obtain much benefit from the alternative proposed. This illustrates the importance of residents' preferences in urban spatial planning in order to achieve efficient urban transport. Applying the index suggests that city authorities should provide fair and equitable public transport systems for suburban residents in the effort to control the phenomenon of urban sprawl. This index is certainly a good tool and prospective benchmark for measuring sustainability in relation to urban development.

  17. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  18. Ontology Maintenance using Textual Analysis

    Directory of Open Access Journals (Sweden)

    Yassine Gargouri

    2003-10-01

    Full Text Available Ontologies are continuously confronted to evolution problem. Due to the complexity of the changes to be made, a maintenance process, at least a semi-automatic one, is more and more necessary to facilitate this task and to ensure its reliability. In this paper, we propose a maintenance ontology model for a domain, whose originality is to be language independent and based on a sequence of text processing in order to extract highly related terms from corpus. Initially, we deploy the document classification technique using GRAMEXCO to generate classes of texts segments having a similar information type and identify their shared lexicon, agreed as highly related to a unique topic. This technique allows a first general and robust exploration of the corpus. Further, we apply the Latent Semantic Indexing method to extract from this shared lexicon, the most associated terms that has to be seriously considered by an expert to eventually confirm their relevance and thus updating the current ontology. Finally, we show how the complementarity between these two techniques, based on cognitive foundation, constitutes a powerful refinement process.

  19. Development of the tool infrastructure for implementation of the maintenance rule

    International Nuclear Information System (INIS)

    Lo, Chung-Kung; Hsu, Pi-Lin

    2009-01-01

    INER PSA Group helps the three operating plants in Taiwan to decide the importance of their scoped-in equipment in terms of risk significance and develop the application database software (MEMOS) to implement the maintenance effectiveness monitoring process. NER also develops a software tool (MIRU) used in the on-line maintenance scheduling and risk assessment process. It serves as a platform for the plants to plan their daily maintenance activities and perform the risk assessment in the future rolling on-line maintenance. The implementation of routine on-line maintenance will be a critical step towards improving the capacity factors and thus further enhancement of the performance of nuclear power in Taiwan

  20. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  1. Conditions of job performance quality during nuclear reactor maintenance

    International Nuclear Information System (INIS)

    Babos, K.; Takacs, J.

    1991-01-01

    The education and training programs of the maintenance personnel at the Paks Nuclear Power Plant, Hungary are described. In addition to well trained personnel, the conditions of job quality involves the preparation of job by proper check lists and availability of documentation, and the inspection and checking of the accomplishment of job tasks. Such an inspection procedure is proposed. (R.P.) 2 figs

  2. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  3. Integrated preventive maintenance and production decisions for imperfect processes

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Nahas, Nabil; Ben-Daya, Mohamed

    2016-01-01

    This paper integrates production, maintenance, and quality for an imperfect process in a multi-period multi-product capacitated lot-sizing context. The production system is modeled as an imperfect machine, whose the status is considered to be either in-control or out-of-control. When the machine is out of control, it produces a fraction of nonconforming items. During each period, this machine is inspected and imperfect preventive maintenance activities are simultaneously performed to reduce its age, proportional to the preventive maintenance level. The objective is to minimize the total cost, while satisfying the demand for all products. Our optimization model allows for a joint selection of the optimal values of production plan, and the maintenance policy, while taking into account quality related costs. A solution algorithm is developed and illustrative numerical examples are presented. It is found that the increase in PM level leads to reductions in quality control costs. Furthermore, if the cost of performing PM is high to the point where it is not compensated for by reductions in the quality related costs, then performing PM is not justifiable. Finally, using non-periodic preventive maintenance with the possibility of different preventive maintenance levels may result in an improvement of the total cost. - Highlights: • We integrate production, maintenance, and quality. • We evaluate all the expected costs. • Our model allows for a joint selection of the optimal values. • A solution algorithm is developed. • Increasing PM level will decrease quality control costs.

  4. Performance Indexing: Assessing the Nonmonetized Returns on Investment in Military Equipment

    Science.gov (United States)

    2016-05-17

    Image designed by Diane Fleischer PERFORMANCE INDEXING: Assessing the NONMONETIZED RETURNS ON INVESTMENT in Military Equipment Ian D...MacLeod and Capt Robert A. Dinwoodie, USMC A prime managerial concern is how to decide which investment alternatives provide the greatest return with...agencies, these methods often fall short because typical governmental investments do not have a monetary return. The processes underpinning governmental

  5. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  6. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  7. Reliability centered Maintenance (RCM) program for Chashma NPP (CHASNUPP)

    International Nuclear Information System (INIS)

    Khalid, S.; Khan, S.A.

    2000-01-01

    This paper describes the proposed Reliability Centered Maintenance (RCM) program for Chashma Nuclear Power Plant (CHASNUPP). Major steps are the identification of risk critical components and the implementation of RCM procedures. Identification of risk critical components is based upon the CHASNUPP level 1 PSA results (performed under IAEA TC Project PAK/9/019) which is near completion. The other requirements for implementation of RCM program is the qualitative analysis to be performed for identifying the dominant potential failure modes of each risk critical component and determination of the necessary maintenance activities, required to ensure reliable operation of the identified risk critical components. Implementation of RCM program for these components will lead to improvement in plant availability and safety together with reduction in the maintenance cost. Development - implementation of RCM program at this stage will help the CHASNUPP Maintenance department who is now developing the maintenance program - procedures for CHASNUPP. (author)

  8. Demonstration of Sensor Data Integration Across Naval Aviation Maintenance

    Science.gov (United States)

    2018-02-01

    Concepts, Programs and Processes; Maintenance Unit Department, Division Organization; Manpower Management ; and Aviation Officers.” http...Naval Aviation Maintenance Alejandra Jolodosky and Adi Zolotov February 2018 This work was performed under Federal Government Contract...underutilized sensor data. CNA proposed a pilot program that integrated sensor data across maintenance levels to expedite repairs of aviation parts

  9. 78 FR 44475 - Protection System Maintenance Reliability Standard

    Science.gov (United States)

    2013-07-24

    ... that the performance or product has some reliability-related value, then the requirement will have...] Protection System Maintenance Reliability Standard AGENCY: Federal Energy Regulatory Commission, Energy... Commission proposes to approve a revised Reliability Standard, PRC-005- 2--Protection System Maintenance, to...

  10. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI and Non-Green Building Index (Non-GBI Rated Building in Malaysia

    Directory of Open Access Journals (Sweden)

    Ping Lee Zheng

    2016-01-01

    Full Text Available Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more than 2 years fully operated buildings. There are two categories of selected buildings which are residential and non-residential type of building. Each category of the building consists of similar building’s characteristic such as geographic location, mode of operation, building heights, total numbers of floors and units. The scope of building’s maintenance for this study is mainly on wear and tear of the wall painting, electrical light fittings, ceiling panels, roofing system and mechanical services like water pump system are recorded for their replacement frequency of service and the cost involved within a consistent period of 12 months operation at cost percentage saving of 78.9% and 40.4% for residential and non-residential buildings respectively compare against Non-GBI rated buildings. Electricity consumption for GBI rated buildings are lower than Non-GBI rated buildings which recorded at the cost variance of 23.8% and 6.3% and water consumption at 35.9% and 44.0% for the above mentioned two main categories of selected case study buildings. Results from this study conclude major savings on residential buildings category in term of maintenance cost and electricity consumption for GBI rated buildings. Whereby, non-residential category of buildings, GBI rated building had been proven to obtain significant savings in terms of maintenance cost and water consumption.

  11. Double-layered metal grating for high-performance refractive index sensing.

    Science.gov (United States)

    Li, Guozhen; Shen, Yang; Xiao, Guohui; Jin, Chongjun

    2015-04-06

    The detection of minuscule changes in the local refractive index by localized surface plasmon resonances (LSPRs), carried by metal nanostructures, has been used successfully in applications such as real-time and label-free detection of molecular binding events. However, localized plasmons demonstrate 1-2 orders of magnitude lower figure of merit (FOM) compared with their propagating counterparts. Here, we propose and experimentally demonstrate a high-performance refractive index sensor based on a structure of double-layered metal grating (DMG) with an FOM and FOM* reaching 38 and 40 respectively under normal incidence. Such a high FOM and FOM* arise from a result of a sharp fano resonance, which is caused by the coherent interference between the LSPR from the individual top gold stripes and Wood's anomaly (WA). Moreover, a small conformal decay length of ~68 nm is determined in DMG, indicating that the DMG is a promising candidate for label-free biomedical sensing.

  12. Implementing a Reliability Centered Maintenance Program at NASA's Kennedy Space Center

    National Research Council Canada - National Science Library

    Tuttle, Raymond

    1998-01-01

    .... A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance...

  13. Online maintenance of sensory and motor representations: effects on corticospinal excitability.

    NARCIS (Netherlands)

    Hurk, P. van den; Mars, R.B.; Elswijk, G.A.F. van; Hegeman, J.; Pasman, J.W.; Bloem, B.R.; Toni, I.

    2007-01-01

    Flexible behavior requires the ability to delay a response until it is appropriate. This can be achieved by holding either a sensory or a motor representation online. Here we assess whether maintenance of sensory or motor material drives the motor system to different functional states, as indexed by

  14. Online maintenance of sensory and motor representations: Effects on corticospinal excitability

    NARCIS (Netherlands)

    Hurk, P.A.M. van den; Mars, R.B.; Elswijk, G.A.F. van; Hegeman, J.; Pasman, J.W.; Bloem, B.R.; Toni, I.

    2007-01-01

    Flexible behavior requires the ability to delay a response until it is appropriate. This can be achieved by holding either a sensory or a motor representation online. Here we assess whether maintenance of sensory or motor material drives the motor system to different functional states, as indexed by

  15. STATUS KESEHATAN GIGI, PERFORMED TREATMENT INDEX DAN REQUIRED TREATMENT INDEX ANAK SEKOLAH DASAR DI KABUPATEN CIANJUR, KARAWANG DAN SERANG

    Directory of Open Access Journals (Sweden)

    Magdarina D. Agtini

    2012-10-01

    Full Text Available Community dental health status for permanent teeth in determined by the DMF-T (Decayed Misssing and Filled Teeth. The DMF-T in a number of industrialized nations shows a tendency to drop while the trend in developing nations is increasing. In Indonesia dental caries is still the foremost problem in oral and dental diseases, Prevalence of dental caries is around 85%-99%. The DMF-T is varied, reflect geographic and ages variations. In three decade's the intensity of dental caries is increasing with each decade, 0,70 DMF-T in 1970 to be 2,30 DMF-T in 1980 and 2,70 DMF-Tin 1990. Goal of dental caries control for 2010 is DMF-T ≤ 1 for 12 years age group. Baseline study is therefore necessary to ascertain DMF-T, PTI (Performed Treatment Index and RTI (Required Treatment Index. The study was implemented in the districts of Cianjur, Karawang and Serang in West Java for two years. The study design was cohort. The respondents  were 1200 pupils aged 8 years, randomly selected with a signifzcantcy grade of p < 0,05 and power of 0,20. The study results showed average of DMF-T at the beginning was 1,52 ± 1,21, and after two years the DMF-T was 2.45 ± 1.51 comprise only of the decayed component, and There was significant different (p=0,000. The DMF-T was low WHO criteria, nevertheless the PTI (1,2% was very low and the RTI (98% was very high. The DMF_T average shows a tendency to increase, with D as the largest component and F (Filling the smallest one. The control of dental caries faces several problems, like the limited number of manpower and facilities, and limited supply of water and electricity incertain areas. Therefore treatment of dental caries with GIC fillings using the ART method should be taken into consideration receive the necessary attention.   Key words:  Status kesehatan gigi, Karies, Performed treatment Index (PTI,  Required Treatment  Index (RTI

  16. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  17. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  18. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  19. The 2nd international conference on CANDU maintenance. Proceedings

    International Nuclear Information System (INIS)

    1992-01-01

    The conference mainly dealt with all aspects of the maintenance of CANDU power plants, but also included some papers on PWR plants, one on a coal-burning station, and one on robotics for fusion. Volume 1 includes sessions on the following topics: Plenary, Human performance, Maintenance planning and resourcing, Life cycle management, Maintenance cost evaluation and control, Use of special teams, Innovative maintenance techniques, Remote tooling, Reactivity maintenance, Reactor maintenance, Steam generator experience. Out of 34 papers listed under these sessions, one was published as an appendix to Vol. 2, two were published only as loose papers in a virtual supplement, and nine were not published in the proceedings at all. The individual papers have been abstracted separately

  20. Probabilistic safety assessment support for the maintenance rule at Duke Power Company

    International Nuclear Information System (INIS)

    Brewer, H. Duncan; Canady, Ken S.

    1999-01-01

    The Nuclear Regulatory Commission (NRC) published the Maintenance Rule on July 10, 1991 with an implementation date of July 10, 1996 . Maintenance rule implementation at the Duke Power Company has used probabilistic safety assessment (PSA) insights to help focus the monitoring of structures, systems and components (SSC) performance and to ensure that maintenance is effectively performed. This paper describes how the probabilistic risk assessment (PRA) group at the Duke Power Company provides support for the maintenance rule by performing the following tasks: (1) providing a member of the expert panel; (2) determining the risk-significant SSCs; (3) establishing SSC performance criteria for availability and reliability; (4) evaluating past performance and its impact on core damage risk as part of the periodic assessment; (5) providing input to the PRA matrix; (6) providing risk analyses of combinations of SSCs out of service; (7) providing support for the SENTINEL program; and (8) providing support for PSA training. These tasks are not simply tied to the initial implementation of the rule. The maintenance rule must be kept consistent with the current design and operation of the plant. This will require that the PRA models and the many PSA calculations performed to support the maintenance rule are kept up-to-date. Therefore, support of the maintenance rule will be one of the primary roles of the PSA group for the remainder of the life of the plant

  1. Effect of changes in contractility on the index of myocardial performance in the dysfunctional left ventricle

    Directory of Open Access Journals (Sweden)

    Lavine Steven J

    2006-11-01

    Full Text Available Abstract Background The index of myocardial performance has prognostic power in patients with cardiomyopathy and following myocardial infarction. As the index of myocardial performance has been shown to be preload and afterload dependent, the effect of altering contractility on IMP and its components with left ventricular dysfunction has been incompletely delineated. Methods Chronic left ventricular dysfunction was induced in 10 canines using coronary microsphere embolization. Each dog was instrumented and imaged with 2D echo and Doppler. At the same atrially paced rate, contractility was increased with a dobutamine infusion and then following 4 weeks of oral digoxin. Results With chronic left ventricular dysfunction, a reduced left ventricular ejection fraction (42 ± 3%, p Conclusion Increased inotropy with digoxin and dobutamine reduced the index of myocardial performance in dogs with left ventricular dysfunction. Shortened isovolumic contraction time, increased diastolic filling period, and reduced left ventricular end diastolic pressure with digoxin may provide insight into its efficacy in heart failure.

  2. Maintenance care in chiropractic - what do we know?

    DEFF Research Database (Denmark)

    Leboeuf-Yde, Charlotte; Hestbæk, Lise

    2008-01-01

    of maintenance care are considered controversial. It is therefore relevant to investigate the scientific evidence forming the basis for its use. OBJECTIVES: A review of the literature was performed in order to obtain answers to the following questions: What is the exact definition of maintenance care, what...... any of the questions. CONCLUSION: There is no evidence-based definition of maintenance care and the indications for and nature of its use remains to be clearly stated. It is likely that many chiropractors believe in the usefulness of maintenance care but it seems to be less well accepted...

  3. Mining Surveillance and Maintenance Dollars

    International Nuclear Information System (INIS)

    MARTINEZ, R.

    2000-01-01

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S and M) activities. However, ongoing S and M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations

  4. Maintenance policy of the nuclear park

    International Nuclear Information System (INIS)

    Teisset, J.M.

    1995-01-01

    The nuclear installations maintenance policy of Electricite de France (EDF) follows three axes: first, controlling the aging of the production tool to warrant the safety and the functional reliability during the 40 years of installations service life. Second: optimizing the maintenance activities taking into account the safety goals, costs, security, dosimetry, duration of outages, and intervention conditions in the decisions. Third: developing a real partnership with contractors. EDF has decided to decentralize its maintenance operations towards each unit which is in charge of the organization of its own project. A better management of the contractor personnel has allowed to increase the performances of maintenance operations. The development of long-term agreements with contractors has permitted to reinforce the qualification, the responsibility and the efficiency of the personnel and to improve their means and tools. (J.S.). 1 photo

  5. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  6. Optimizing stormwater treatment practices a handbook of assessment and maintenance

    CERN Document Server

    Erickson, Andrew J; Gulliver, John S

    2013-01-01

    Optimizing Stormwater Treatment Practices: A Handbook of Assessment and Maintenance provides the information necessary for developing and operating an effective maintenance program for stormwater treatment. The book offers instructions on how to measure the level of performance of stormwater treatment practices directly and bases proposed maintenance schedules on actual performance and historical maintenance efforts and costs. The inspection methods, which are proven in the field and have been implemented successfully, are necessary as regulatory agencies are demanding evaluations of the performance of stormwater treatment practices. The authors have developed a three-tiered approach that offers readers a standard protocol for how to determine the effectiveness of stormwater treatment practices currently in place. This book also: Provides a standard protocol for how to determine the effectiveness of stormwater treatment practices Assists readers with identifying which assessment techniques to use for stormwa...

  7. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  8. Systematic comparison of ORC configurations by means of comprehensive performance indexes

    International Nuclear Information System (INIS)

    Branchini, Lisa; De Pascale, Andrea; Peretto, Antonio

    2013-01-01

    The Organic Rankine Cycle (ORC) is considered as an emerging technology for power generation through heat recovering from different thermal sources, based on the use of organic fluids as working medium. This paper presents a numerical study to assess the relevance: i) of the thermodynamic cycle, ii) of the main design parameters and iii) of the working fluid, on the achievable performance. The ORC performance is here calculated in terms of six different thermodynamic indexes, offering comprehensive information, namely: cycle efficiency, specific work, recovery efficiency, turbine volumetric expansion ratio, ORC fluid-to-hot source mass flow ratio and heat exchangers size parameter. In the framework of a systematic investigation approach, various possible modifications to the simple ORC plant layout are here analyzed and compared, in order to improve the ORC recovery performance; arrangements such as recuperation, superheated cycle, supercritical conditions, regenerative cycle and their combinations are taken into account. The investigation is carried out by means of an in-house developed calculation tool, based on a thermodynamic property database of the considered fluids, including aromatics, siloxanes, refrigerants and hydrocarbons. A comprehensive parametric analysis of these cycles at different hot source temperature and different evaporation pressure values is carried out. The objectives of this investigation are to provide useful guidelines to select the ORC configuration, the most appropriate fluid and to define the operating parameters, depending on the specific application. Thermodynamic results are also related with sizing of ORC components and thus can be used for economic assessment of the different ORC design alternatives. -- Highlights: • Systematic comparison of ORC thermodynamic arrangements is performed. • Performance is calculated introducing six comprehensive energy and size/economic indexes. • An in-house-developed calculation tool is used

  9. The MERC maintenance system

    International Nuclear Information System (INIS)

    Izquierdo, J.J.; Chauvire, P.; Plessis, L.

    1991-01-01

    Maintenance in the modern commercial reprocessing plants is a subject of the highest priority in order to guarantee availability for the whole life of the plant. The design concept of the UP3 reprocessing plant at La Hague identified several categories of equipment according to their maintenance design principles. Among them, Standard Process Equipment such as pumps, valves, ejectors and filters which need periodic maintenance. These equipment items are designed in removable modular form to avoid the need to disconnect piping. Removal is performed under shielding and without breach of containment through the use of a transfer cask that is connected to the cell containing the equipment to be removed. This transfer cask is called MERC (Mobile Equipment Replacement Cask). Containment is preserved by an air-tight system consisting of coupled doors, with a special connecting gasket. This system can remove and replace failed equipment, without spreading contamination to work areas. (author)

  10. 6. CNS international conference on CANDU maintenance. Proceedings

    International Nuclear Information System (INIS)

    2003-01-01

    The 6th CNS International Conference on CANDU Maintenance took place in Toronto, Ontario on November 16-18, 2003. The theme for the conference was 'Maintenance for Life'. About 270 delegates attended the conference held by the Canadian Nuclear Society. The conference consisted of four parallel sessions, a pattern that continued throughout the conference. Papers were grouped under the following headings: Fuel Channels and End Fittings - Assessments; Fuel Channels and End Fittings - Inspections; Fuel Channels and End Fittings - Maintenance; Fuel Channels and End Fittings - Universal Delivery Machine; Water Upgrading; Performance and Plant Life Improvement; Steam Generator Life Management; Steam Generator Modifications; Steam Generators - Inspections; Steam Generators - Assessments; Maintenance Programs; Feeder Inspections; Feeder Assessment and Mitigation; Valve Maintenance; Instrumentation and Control; Inspection Technology; and Fuel Handling

  11. Performance of a risk index for advanced proximal colorectal neoplasia among a racially/ethnically diverse patient population (risk index for advanced proximal neoplasia).

    Science.gov (United States)

    Levitzky, Benjamin E; Brown, Colin C; Heeren, Timothy C; Schroy, Paul C

    2011-06-01

    Tailoring the use of screening colonoscopy based on the risk of advanced proximal neoplasia (APN) has been advocated as a strategy for reducing demand and optimizing effectiveness. A 7-point index based on age, sex, and distal findings at sigmoidoscopy has been proposed that stratifies individuals into low, intermediate, and high-risk categories. The aim of this cross-sectional analysis was to determine the validity of this index, which was originally derived and validated among mostly whites, for black and Hispanic patients. Data, including age, sex, colonoscopic findings, and pathology, were collected retrospectively from 1,481 white, 1,329 black, and 689 Hispanic asymptomatic, average-risk patients undergoing screening colonoscopy between 2000 and 2005. Cumulative scores ranging from 0 to 7 were derived for each subject and categorized as low, intermediate, or high risk. Rates of APN were assessed for each risk category after stratification by race/ethnicity. Index performance was assessed using the C-statistic and compared across the three racial groups. Rates of APN among patients categorized as low, intermediate, or high risk increased from 1.0 to 2.8 to 3.7% for whites, 1.0 to 2.2 to 4.2% for blacks, and 0.6 to 1.9 to 3.7% for Hispanics. The index performed similarly for all three groups, but showed limited ability to discriminate low from intermediate-risk patients, with C-statistic values of 0.62 for whites, 0.63 for blacks, and 0.68 for Hispanics. A risk index based on age, sex, and distal endoscopic findings has limited ability to discriminate low from intermediate-risk white, black, and Hispanic patients for APN.

  12. Assessment and improvement of urban streets maintenance: Case study Kragujevac

    Directory of Open Access Journals (Sweden)

    Jokanović Igor

    2017-01-01

    Full Text Available City of Kragujevac struggles with providing road maintenance services due to limited funds and low capacity within the existing Public Utility Companies. As a solution to problems with traditional methods of contracting, many road authorities have moved to contracting road maintenance works to the private sector based on performance measures. The paper presents the outcomes of the study conducted for the purpose of improving current practice and condition of urban network within the City of Kragujevac through the application of performance-based maintenance contracting.

  13. Pavement Condition Assessment Using IRI from Roadroid and Surface Distress Index Method on National Road in Sumenep Regency

    Science.gov (United States)

    Arianto, T.; Suprapto, M.; Syafi’i

    2018-03-01

    The pavement condition will decrease due to the influence of traffic and environment, so that the maintenance effort is needed to maintain the road condition during the service period. In order to carry out road maintenance activities right on target, there needs to be a plan based on accurate pavement condition data. Road roughness is the most commonly used condition parameter in evaluating pavement conditions objectively because road roughness data is relatively easy to obtain, well correlated with vehicle operating costs and the most relevant parameter in road functional performance measurement. The Roadroid is an Android-based application that measures road roughness by using vibration sensors on a smartphone so it is possible to get an International Roughness Index (IRI) value as an indicator of pavement conditions more easily and efficiently. Besides based on road roughness, pavement condition evaluation can also be done visually by using Surface Distress Index (SDI) method that uses the total crack area parameters, average crack width, total number of potholes and the average depth of rutting. This study attempts to assess the condition of Jenderal Sudirman-Kalianget road by combining IRI Roadroid value and SDI value which will be used as the basis to determine the required road maintenance. This road segment is one of the national strategic road connecting the center of Sumenep regency with the Kalianget harbor. Based on IRI measurement and SDI calculation, the pavement condition of Jenderal Sudirman-Kalianget road can be described 4.2 kilometers (37.17%) were good and 2.3 kilometers (20.35%) were fair that need routine maintenance. While 2.1 kilometers (18.58%) were bad and 2.7 kilometers (23.89%) were poor that need periodical maintenance and reconstruction.

  14. Risk assessment of maintenance operations: the analysis of performing task and accident mechanism.

    Science.gov (United States)

    Carrillo-Castrillo, Jesús A; Rubio-Romero, Juan Carlos; Guadix, Jose; Onieva, Luis

    2015-01-01

    Maintenance operations cover a great number of occupations. Most small and medium-sized enterprises lack the appropriate information to conduct risk assessments of maintenance operations. The objective of this research is to provide a method based on the concepts of task and accident mechanisms for an initial risk assessment by taking into consideration the prevalence and severity of the maintenance accidents reported. Data were gathered from 11,190 reported accidents in maintenance operations in the manufacturing sector of Andalusia from 2003 to 2012. By using a semi-quantitative methodology, likelihood and severity were evaluated based on the actual distribution of accident mechanisms in each of the tasks. Accident mechanisms and tasks were identified by using those variables included in the European Statistics of Accidents at Work methodology. As main results, the estimated risk of the most frequent accident mechanisms identified for each of the analysed tasks is low and the only accident mechanisms with medium risk are accidents when lifting or pushing with physical stress on the musculoskeletal system in tasks involving carrying, and impacts against objects after slipping or stumbling for tasks involving movements. The prioritisation of public preventive actions for the accident mechanisms with a higher estimated risk is highly recommended.

  15. Valves maintenance management in nuclear power plants

    International Nuclear Information System (INIS)

    Trost, J.

    2001-01-01

    The deregulation of Europe's power market will force nuclear power plant operators to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing expenditure on maintenance. Framatome ANP GmbH, in cooperation with plant operators is currently developing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. (Author)

  16. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  17. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  18. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  19. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  20. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work on the CERN telephone exchanges will be performed on 10 July from 8 p.m. to midnight. During this intervention, the fixed telephone services, audioconference services and GSM calls made via the 333 prefix may be disrupted. However, the CCC and the fire brigade will be reachable at all times. For more details about this maintenance work, please call the telephone switchboard on 76111 or send an e-mail. Telecom SectionIT/CS

  1. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    A maintenance of the CERN telephone exchanges will be performed on the 10th of July from 8 p.m. to midnight. During this intervention, the fixed telephone services, audioconference services, and GSM calls made via the 333 prefix may be disrupted. However, the CCC and the fire brigade will be reachable at any time. For more details about this maintenance, please contact the telephone switchboard at 76111 or by email. Telecom Section IT/CS

  2. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  3. A development of maintenance educational support method by using navigation method. Pt. 2. A basic design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo

    2002-01-01

    The nuclear power plant has the human error produced from the disagreement of the difficulty of systematic error and maintenance work and the work execution capability, such as the persons concerned, which are produced from the fault of the command and the chain of command concerning organization. Then, this research establishes the new maintenance educational support prototype system for aiming at organization as Trinity (a supervision person, a construction person in charge, a work person in charge, and group length) , and improvement in human reliability for the purpose of aiming at before hand prevention of a systematic error, human error, and the accident and a trouble. Main results (I) In this research, as a result of investigating and analyzing about an exchange of the information which exists between the Trinity of concerning maintenance work execution, it became clear that the command and the chain of command for job execution exist among 3 persons. (Fig. 1) It will consider as the index for establishment of this command and chain of command of the maintenance educational support method from now on. (2) The basic design was performed on the educator's-ed position-and-rank level' about the 'prototype system' which enables suitable educational support. (Fig. 2) Its feature are as follows. (I) Presumption of the mismatch portion concerning the position-and-rank level / work execution capability before and behind the education by the initial educational scenario concerning an organization / on-site work, and education, (2) Implementation of reeducation by the 'reeducation scenario' concerning the organization / on-site work for complementing and canceling the mismatch portion. (3) Implementation of the comprehensive judgment (the educational effect) by analysis of the contents of a reply (conversation) of the educator-ed in reeducation scenario process. By this research, the possibility of the self-recognition of the problem of self or weak points (knowledge

  4. 78 FR 9865 - Air Carrier Contract Maintenance Requirements; Extension of Comment Period

    Science.gov (United States)

    2013-02-12

    .... FAA-2011-1136; Notice No. 12-07] RIN 2120-AJ33 Air Carrier Contract Maintenance Requirements... performing contract maintenance that are acceptable to the FAA and to include them in their maintenance... contract their maintenance. At the behest of several of their FAA-certificated air carrier members...

  5. A framework to practical predictive maintenance modeling for multi-state systems

    International Nuclear Information System (INIS)

    Cher Ming Tan; Raghavan, Nagarajan

    2008-01-01

    A simple practical framework for predictive maintenance (PdM)-based scheduling of multi-state systems (MSS) is developed. The maintenance schedules are derived from a system-perspective using the failure times of the overall system as estimated from its performance degradation trends. The system analyzed in this work is a flow transmission water pipe system. The various factors influencing PdM-based scheduling are identified and their impact on the system reliability and performance are quantitatively studied. The estimated times to replacement of the MSS may also be derived from the developed model. The results of the model simulation demonstrate the significant impact of maintenance quality and the criteria for the call for maintenance (user demand) on the system reliability and mean performance characteristics. A slight improvement in maintenance quality is found to postpone the system replacement time by manifold. The consistency in the quality of maintenance work with minimal variance is also identified as a very important factor that enhances the system's future operational and downtime event predictability. The studies also reveal that in order to reduce the frequency of maintenance actions, it is necessary to lower the minimum user demand from the system if possible, ensuring at the same time that the system still performs its intended function effectively. The model proposed can be utilized to implement a PdM program in the industry with a few modifications to suit the individual industrial systems' needs

  6. A study of adopting maintenance rule under the periodic safety review and reliability centered maintenance program

    International Nuclear Information System (INIS)

    Kilyoo, Kim

    2001-01-01

    U.S Maintenance Rule (MR) has three main functions. One is to monitor the performance changes of SSCs (Structure, System, and Component) caused by risk informed applications. Periodic Safety Review (PSR) program is widely adopted in Europe while it is not adopted in U. S. A where MR and new oversight program are instead used. Recently, in Korea, it was determined to adopt PSR, and the first PSR program has started this year for Kori unit 1 as a pilot plant. Also, a traditional Reliability Centered Maintenance (RCM) has been performed for 4 systems of YGN unit 1 and 2 and it will be applied to the other nuclear power plants in Korea. However, since MR is adopting many useful concept of RCM, traditional RCM could not be further performed without being associated with MR. Thus, MR, RCM and PSR have recently become hot issue policies which should be well associated each other in Korea, and this paper suggests a desirable new maintenance process which would embrace the concepts of the three policies, and also discusses whether U.S. MR is necessary even though a PSR program is already adopted, and if necessary, then how cost-effectively it can be introduced to. (author)

  7. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  8. Fatty acid composition of adipose tissue triglycerides after weight loss and weight maintenance

    DEFF Research Database (Denmark)

    Kunešová, M; Hlavatý, P; Tvrzická, E

    2012-01-01

    Fatty acid composition of adipose tissue changes with weight loss. Palmitoleic acid as a possible marker of endogenous lipogenesis or its functions as a lipokine are under debate. Objective was to assess the predictive role of adipose triglycerides fatty acids in weight maintenance in participants...... of the DIOGENES dietary intervention study. After an 8-week low calorie diet (LCD) subjects with > 8 % weight loss were randomized to 5 ad libitum weight maintenance diets for 6 months: low protein (P)/low glycemic index (GI) (LP/LGI), low P/high GI (LP/HGI), high P/low GI (HP/LGI), high P/high GI (HP....../HGI), and a control diet. Fatty acid composition in adipose tissue triglycerides was determined by gas chromatography in 195 subjects before the LCD (baseline), after LCD and weight maintenance. Weight change after the maintenance phase was positively correlated with baseline adipose palmitoleic (16:1n-7...

  9. Pilot Study for Maintenance Rule at KSNP

    International Nuclear Information System (INIS)

    Choi, Kwang Hee; Jeong, Hyeon Jong; Jee, Moon Hak; Hong, Sung Yull

    2005-01-01

    Maintenance Rule (MR), which was developed to monitor the effectiveness of maintenance in a nuclear power plant (NPP), has been received as highly successful program by and large since its implementation in 1996 in the United States. Korea has initiated two pilot programs to implement the Maintenance Rule program in 2003. Selected plants for the pilot implementation are Kori 3 and 4 units and Ulchin 3 and 4 units, where Kori 3 and 4 units are Westinghouse units and Ulchin 3 and 4 units are Korean Standardized Nuclear Power (KSNP) Plant units. This paper describes the results of each key tasks completed to date and insights gained from pilot study on the KSNP units. Currently, Scoping of the functions of maintenance rule and determination of safety significance level have been completed during first year. As first task, total 607 functions were identified and defined by detailed function analysis on 135 systems that cover all plant systems. About 55% of total functions are selected as within the scope of maintenance rule. Among these inscoped functions, 56% of scoped functions are safety related and 44% are non-safety related functions. Evaluation of safety significance for each function was determined by expert panel consist of eight experts in field of plant maintenance, operation, PSA, work schedule and system engineers. As a result, about 46% of functions were determined to be high safety significant functions and rest of the functions were classified as low safety significant. The remaining tasks that are included determination of performance criteria and preparation of implementing guideline will be performed in following years

  10. The TFTR maintenance manipulator

    International Nuclear Information System (INIS)

    Kungl, D.; Loesser, D.; Heitzenroeder, P.; Cerdan, G.

    1989-01-01

    TFTR plans to begin D-T experiments in mid 1990. The D-T experimental program will produce approximately one hundred shots, with a neutron generation rate of 10 19 neutrons per shot. This will result in high levels of activation in TFTR, especially in the vacuum vessel. The primary purpose of the Maintenance Manipulator is to provide a means of remotely performing certain defined maintenance and inspection tasks inside the vacuum torus so as to minimize personnel exposure to radiation. The manipulator consists of a six-link folding boom connected to a fixed boom on a movable carriage. The entire manipulator is housed in a vacuum antechamber connected to the vacuum torus, through a port formerly used for a vacuum pumping duct. The configuration extends 180 0 in either direction to provide complete coverage of the torus. The four 3500 l/s turbopumps which were formerly used in the pumping duct will be mounted on the antechamber. The manipulator will utilize two end effectors. The first, called a General Inspection Arm (GIA) provides a movable platform to an inspection camera and an in-vacuum leak detector. The second is a bilateral, force-reflecting pair of slave arms which utilize specially developed tools to perform several maintenance functions. All components except the slave arms are capable of operating in TFTR's vacuum environment and during 150 0 C bakeout of the torus. (orig.)

  11. A study on maintenance rule program and its application to Korean NPP - Rev.1

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Yang, Joon Eon; Ha, Jae Joo

    2001-03-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  12. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  13. Reliability assessment of power pole infrastructure incorporating deterioration and network maintenance

    International Nuclear Information System (INIS)

    Ryan, Paraic C.; Stewart, Mark G.; Spencer, Nathan; Li, Yue

    2014-01-01

    There is considerable investment in timber utility poles worldwide, and there is a need to examine the structural reliability and probability based management optimisation of these power distribution infrastructure elements. The work presented in this paper builds on the existing studies in this area through assessment of both treated and untreated timber power poles, with the effects of deterioration and network maintenance incorporated in the analysis. This more realistic assessment approach, with deterioration and maintenance considered, was achieved using event-based Monte Carlo simulation. The output from the probabilistic model is used to illustrate the importance of considering network maintenance in the time-dependent structural reliability assessment of timber power poles. Under wind load, treated and untreated poles designed and maintained in accordance with existing Australian standards were found to have similar failure rates. However, untreated pole networks required approximately twice as many maintenance based pole replacements to sustain the same level of reliability. The effect of four different network maintenance strategies on infrastructure performance was also investigated herein. This assessment highlighted the fact that slight alterations to network maintenance practices can lead to significant changes in performance of timber power pole networks. - Highlights: • A time-dependent structural reliability model was developed for timber power poles. • Deterioration and network maintenance were incorporated into this event based model. • Network maintenance had a significant impact on power pole wind vulnerability. • Treated and untreated poles designed to Australian standards had similar reliability. • Minor alterations to maintenance strategies had large effects on network performance

  14. Maintenance management during long-term stop of JRR-3

    International Nuclear Information System (INIS)

    Matsui, Yutaka; Suwa, Masayuki; Wada, Shigeru

    2016-01-01

    JRR-3 has been continuing its stop state for more than 5 years as of FY2015 after stopping the use operation of the reactor in November 2010. Different responses are required in the maintenance management for operation resumption, compared with those in normal operation. This paper introduces part of the maintenance managements that are performed during long-term stop. The water qualities of primary coolant and secondary coolant are controlled by measuring pH and conductivity, and the prevention of crevice corrosion of equipment is performed. In the management of pumps for coolant circulation, vibration measurement is performed to confirm that there are no signs of abnormality. As the management of the core structure, the bend measurement of beryllium reflector is performed to confirm that there is no hindrance to operation resumption, and the visual inspection of high burnup fuel elements is performed to confirm that abnormality has not occurred. As for the management of monitoring equipment, the equipment required in shutdown period is subjected to calibration work, and the equipment required in operation period is subjected to soundness check based on the results of cooling system operation. As the functional maintenance of the cooling system, cooling system operating test and 10-day continuous operation of the cooling system are monthly performed to confirm the soundness of equipment. In addition, the competence maintenance and capacity improvement of operators are performed through the cooling system operation and reactor simulator training. (A.O.)

  15. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  16. Evaluation of Rutting Performance of Asphalt Mixture with Driving Wheel Pavement Analyzer

    Directory of Open Access Journals (Sweden)

    Xu Cai

    2017-01-01

    Full Text Available Rutting is common pavement distress, which leads to lower riding comfort for road users and high maintenance costs. One of the commonly used tests is the simulation test with wheel tracking devices. Here, a new rutting test system has been developed based on the “Driving Wheel Pavement Analyzer” (DWPA to evaluate the rutting performance of asphalt mixtures. This study conducted three types of rutting tests to validate feasibility, reliability, and accuracy of DWPA test. The results indicated that the DWPA test provided more information on ruts and enabled us to distinguish the performance of materials. The CDWPA index is better suited to reflect the rutting resistance of the material, which is highly correlated to the APA rutting index and the rutting test index of China according to the grey relational analysis results.

  17. Risk based maintenance: Resource requirements and organizational challenges

    International Nuclear Information System (INIS)

    Weerakkody, S.D.

    2000-01-01

    10CFR50.65 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants' required licensees to monitor the performance or condition of structures, systems, or components (SSCs) against licensee established goals, in a manner sufficient to provide reasonable assurance that such SSCs are capable of fulfilling their intended functions. The goals were required to be commensurate with safety significance and operating experience. Northeast Utilities relied upon PRAs to implement 10CFR50.65, which is also referred to as the 'Maintenance Rule'. The Maintenance Rule changed some aspects of maintenance of structures, systems, and components (SSC) at nuclear power plants. One objective of the rule was to focus the maintenance resources based on risk significance of components. This paper will discuss the organizational challenges and resource requirements associated with implementation of the Maintenance Rule at nuclear facilities that are supported by the Northeast Utilities Services Company (NUSCo). The paper will discuss (a) how these challenges were addressed, (b) the resources required for ongoing efforts to support the Maintenance Rule, and (c) several key safety benefits derived from the implementation of the Maintenance Rule. (author)

  18. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  19. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  20. A condition-based maintenance policy for multi-component systems with Lévy copulas dependence

    International Nuclear Information System (INIS)

    Li, Heping; Deloux, Estelle; Dieulle, Laurence

    2016-01-01

    In this paper, we propose a new condition-based maintenance policy for multi-component systems taking into account stochastic and economic dependences. The stochastic dependence between components due to common environment is modelled by Lévy copulas. Its influence on the maintenance optimization is investigated with different dependence degrees. On the issue of economic dependence providing opportunities to group maintenance activities, a new maintenance decision rule is proposed which permits maintenance grouping. In order to evaluate the performance of the proposed maintenance policy, we compare it to the classical maintenance policies. - Highlights: • A new adaptive maintenance policy for grouping maintenance actions is proposed. • The impacts of both economic and stochastic dependences are investigated. • The performance of the proposed maintenance policy is evaluated under different system configurations. • The stochastic dependence is modelled by Lévy copulas. • The proposed maintenance decision rule can take full advantage of economic and stochastic dependences.

  1. Continued Evaluation of Gear Condition Indicator Performance on Rotorcraft Fleet

    Science.gov (United States)

    Delgado, Irebert R.; Dempsey, Paula J.; Antolick, Lance J.; Wade, Daniel R.

    2013-01-01

    This paper details analyses of condition indicator performance for the helicopter nose gearbox within the U.S. Army's Condition-Based Maintenance Program. Ten nose gearbox data sets underwent two specific analyses. A mean condition indicator level analysis was performed where condition indicator performance was based on a 'batting average' measured before and after part replacement. Two specific condition indicators, Diagnostic Algorithm 1 and Sideband Index, were found to perform well for the data sets studied. A condition indicator versus gear wear analysis was also performed, where gear wear photographs and descriptions from Army tear-down analyses were categorized based on ANSI/AGMA 1010-E95 standards. Seven nose gearbox data sets were analyzed and correlated with condition indicators Diagnostic Algorithm 1 and Sideband Index. Both were found to be most responsive to gear wear cases of micropitting and spalling. Input pinion nose gear box condition indicators were found to be more responsive to part replacement during overhaul than their corresponding output gear nose gear box condition indicators.

  2. Diets with high or low protein content and glycemic index for weight-loss maintenance

    DEFF Research Database (Denmark)

    Larsen, Thomas Meinert; Dalskov, Stine-Mathilde; Baak, Marleen van

    2010-01-01

    Studies of weight-control diets that are high in protein or low in glycemic index have reached varied conclusions, probably owing to the fact that the studies had insufficient power.......Studies of weight-control diets that are high in protein or low in glycemic index have reached varied conclusions, probably owing to the fact that the studies had insufficient power....

  3. Utility based maintenance analysis using a Random Sign censoring model

    International Nuclear Information System (INIS)

    Andres Christen, J.; Ruggeri, Fabrizio; Villa, Enrique

    2011-01-01

    Industrial systems subject to failures are usually inspected when there are evident signs of an imminent failure. Maintenance is therefore performed at a random time, somehow dependent on the failure mechanism. A competing risk model, namely a Random Sign model, is considered to relate failure and maintenance times. We propose a novel Bayesian analysis of the model and apply it to actual data from a water pump in an oil refinery. The design of an optimal maintenance policy is then discussed under a formal decision theoretic approach, analyzing the goodness of the current maintenance policy and making decisions about the optimal maintenance time.

  4. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  5. New remote maintenance approach for TPX

    International Nuclear Information System (INIS)

    Davis, F.C.; Walker, M.S.; Brown, T.G.

    1993-01-01

    The Tokamak Physics Experiment (TPX), to be located at Princeton Plasma Physics Laboratory, will be a steady-state, high-performance fusion machine. It will use hydrogen fuel during its original operation, deuterium-deuterium (D-D) fuel for an extended intermediate period of time and then a limited number of runs using deuterium-tritium (D-T) fuel. The D-D operations wig generate neutron fluxes that will activate materials of the vacuum vessel. From that point on, the resulting ionizing radiation, which will continue to increase, particularly during D-T operation, will prevent personnel access into the vessel to perform either scheduled or unscheduled maintenance activities. All activities performed within the vacuum vessel must be accomplished using remote means. TPX has taken a new approach for remote maintenance of the components within the vacuum vessel. This document describes the system that is being developed

  6. Remote maintenance system for nuclear facilities

    International Nuclear Information System (INIS)

    Maeda, Masafumi

    1993-01-01

    In the facilities related to atomic energy, from the viewpoint of the reduction of radiation exposure of workers and the heightening of the rate of operation of the facilities, the development of remote maintenance system is regarded as important. Meidensha Electric Manufacturing Co., Ltd. developed the bilateral control type manipulator, BILARM-83, in 1979, and has developed high performance manipulator systems. As the design of the plant that realizes the remote operation maintenance of process machinery and equipment during plant operation, the remote maintenance system by canyon cell techniques, which was adopted in Savannah River plant, USA, and has been operated for nearly 50 years, has been known. The concept of the full remote maintenance system by large scale cell techniques was shown and has been developed by Power Reactor and Nuclear Fuel Development Corp. In order to realize the remote maintenance of such large scale cells, Meidensha is developing the both arm type bilateral servo manipulator, the single arm type power manipulator, the transport system for moving them, the power and signal system and so on. Those systems were adopted for the glass solidification facilities. (K.I.)

  7. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  8. Double-Shell Tank (DST) Maintenance and Recovery Subsystem Definition Report

    International Nuclear Information System (INIS)

    SMITH, E.A.

    2000-01-01

    The description of the Double-Shell Tank (DST) Maintenance and Recovery Subsystem presented in this document was developed to establish its boundaries. The DST Maintenance and Recovery Subsystem consists of new and existing equipment and facilities used to provide tank farm operators logistic support and problem resolution for the DST System during operations. This support will include evaluating equipment status, performing preventive and corrective maintenance, developing work packages, managing spares and consumables, supplying tooling, and training maintenance and operations personnel

  9. Protocol of source shielding maintenance in a level measurement systems

    International Nuclear Information System (INIS)

    Gonzales, E.; Figueroa, J.

    1996-01-01

    Maintenance labor of the source shielding and locking system is not performed in many Venezuelan enterprises that employ radioactive level gauge in large container. The lack of maintenance and the ambient long lasting action have produced impairment of many devices and their given parts rise to economical and radiological protection problems. In order to help to solve the mentioned problems, principally to reduce the unjustified dose to workers, the IVIC Health Physics Service worked out a protocol to perform, in a safety way, the maintenance of source shielding and its locking system. This protocol is presented in this paper. (authors)

  10. Identifying the most significant indicators of the total road safety performance index.

    Science.gov (United States)

    Tešić, Milan; Hermans, Elke; Lipovac, Krsto; Pešić, Dalibor

    2018-04-01

    The review of the national and international literature dealing with the assessment of the road safety level has shown great efforts of the authors who tried to define the methodology for calculating the composite road safety index on a territory (region, state, etc.). The procedure for obtaining a road safety composite index of an area has been largely harmonized. The question that has not been fully resolved yet concerns the selection of indicators. There is a wide range of road safety indicators used to show a road safety situation on a territory. Road safety performance index (RSPI) obtained on the basis of a larger number of safety performance indicators (SPIs) enable decision makers to more precisely define the earlier goal- oriented actions. However, recording a broader comprehensive set of SPIs helps identify the strengths and weaknesses of a country's road safety system. Providing high quality national and international databases that would include comparable SPIs seems to be difficult since a larger number of countries dispose of a small number of identical indicators available for use. Therefore, there is a need for calculating a road safety performance index with a limited number of indicators (RSPI ln n ) which will provide a comparison of a sufficient quality, of as many countries as possible. The application of the Data Envelopment Analysis (DEA) method and correlative analysis has helped to check if the RSPI ln n is likely to be of sufficient quality. A strong correlation between the RSPI ln n and the RSPI has been identified using the proposed methodology. Based on this, the most contributing indicators and methodologies for gradual monitoring of SPIs, have been defined for each country analyzed. The indicator monitoring phases in the analyzed countries have been defined in the following way: Phase 1- the indicators relating to alcohol, speed and protective systems; Phase 2- the indicators relating to roads and Phase 3- the indicators relating to

  11. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology for ex-vessel maintenance operations on auxiliary machine components. These operations consist of repairing and replacing components such as diagnostic, radio-frequency (rf) heating, and fueling systems using remotely operated maintenance equipment in the test cell. In addition, ex-vessel maintenance design also includes developing hot cell facilities for equipment decontamination, repair, and solid radioactive waste handling. The test cell maintenance philosophy is markedly influenced by the neutron/gamma shield surrounding the machine that allows personal access into the test cell one day after shutdown. Hence, maintenance operations can be performed hands-on in the test cell with the shield intact and must be remotely performed when the shield is disassembled for machine access. The constricted access to the auxiliary components of the machine affect the design requirements for the maintenance equipment and impose major spatial constraints. Several major areas of the maintenance system design are being addressed in fiscal year 1987. These include conceptual design of the manipulator system, preliminary remote equipment research and development, and definition of the hot cell, decontamination, and equipment repair facility requirements. The manipulator work includes investigating transporters and viewing/lighting subsystems. 2 figs

  12. Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    International Nuclear Information System (INIS)

    V. Yucel

    2002-01-01

    U.S. Department of Energy (DOE) Order 435.1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities to be performed in maintaining the Performance Assessment (PA) and Composite Analysis (CA) for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). The Disposal Authorization Statement (DAS) for the continuing operations of a LLW facility at the DOE complex specifies the conditions for operations based on approval of a PA and CA, and requires the facility to implement a maintenance program to assure that these conditions will remain protective of the public health and the environment in the future. The goal of the maintenance program is to provide that assurance. The maintenance process is an iterative one in which changing conditions may result in a revision of PA and CA; the revised PA and CA may impose a different set of conditions for facility operation, closure, and postclosure. The maintenance process includes managing uncertainty, performing annual reviews, submitting annual summary reports to DOE Headquarters (DOE/HQ), carrying out special analyses, and revising the PAs and CAs, if necessary. Management of uncertainty is an essential component of the maintenance program because results of the original PAs and CAs are understood to be based on uncertain assumptions about the conceptual models; the mathematical models and parameters; and the future state of the lands, disposal facilities, and human activities. The annual reviews for the PAs include consideration of waste receipts, facility specific factors, results of monitoring, and results of research and development (R and D) activities. Likewise, results of ongoing R and D, changes in land-use planning, new information on known sources of residual radioactive materials, and identification of new sources may warrant an evaluation to

  13. Maintenance Policy in Public-Transport Involving Government Subsidy

    Science.gov (United States)

    Pasaribu, U. S.; Bayuzetra, Y.; Gunawan, L. E.; Husniah, H.

    2018-02-01

    A public transport with government subsidy is considered to encourage the sustainability of the transportation. The transportations revenue is determined by the maximum of the uptimes of the vehicle. In this paper, we study a one-dimensional maintenance policy for new vehicle which is characterized by age parameter. We consider that the degradation of the vehicle is affected by the age of the vehicle, and modelled by using a one-dimensional approach. The owner performs both preventive and corrective maintenance actions, and the preventive maintenance action will reduce the vehicle failure rate and hence it will decrease the corrective maintenance cost during the life time of the vehicle. The decision problem for the owner is to find the optimal preventive maintenance time of the vehicle of each subsidy option offered by maximizing the expected profit for each subsidy.

  14. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  15. Research and Development of a Network-Based Intelligent Maintenance Information System

    Institute of Scientific and Technical Information of China (English)

    ZANG Tie-gang; YANG Ming-zhong; GUO Shun-sheng

    2003-01-01

    A maintenance information system is an important part of equipment management. An intelli gent maintenance information system ( IMIS) is a synthesis of network technology, information technology and intelligent technology. The IMIS is used to finish flexible maintenance decision-making and fast maintenance planning, which helps enterprises to effectively reduce maintenance cost and increase working efficiency. Because the IMIS integrates advanced technologies, its performance is better than a traditional one.The difference between an IMIS and a traditional maintenance information system, and the functions, structure, important realizations, and application of an IMIS are discussed in this paper.

  16. Forecasts of the Maintenance Activity

    Directory of Open Access Journals (Sweden)

    Marius Romocea

    2017-11-01

    Full Text Available Enhancing the machines’ technical and technological performance through constructive improvements that allow for the automation of orders, contributes to the increasing of the production capacity of the system and for maintaining an optimal level of product costs. In order to achieve these goals, it is necessary to organize the maintenance work well, in order to quickly diagnose the malfunctions and to shorten the repair time. Given the scale of the phenomena, this paper seeks to answer two questions, namely: how will be the maintenance in future and also how to prepare this activity.

  17. Different Transportation and Maintenance Strategies for Offshore Wind Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    as different maintenance strategies are considered. The report contains a case study where the presented approach is applied to a wind turbine farm and a sensitivity study of the different parameters like the operational range of the boat/helicopter, the electricity price, real rate of interest, inspection......Inspections as well as transportation of personnel and repair parts are a significant contributor to the levelized cost of energy for offshore wind turbines. There are different operation and maintenance (O&M) strategies for offshore wind turbines. Maintenance can be performed preventively...... of energy using different maintenance and transportation strategies....

  18. 42 CFR 493.1254 - Standard: Maintenance and function checks.

    Science.gov (United States)

    2010-10-01

    ...'s equipment, instruments, or test systems. The laboratory must perform and document the following... available and modified by the laboratory, or maintenance and function check protocols are not provided by the manufacturer. The laboratory must do the following: (1)(i) Establish a maintenance protocol that...

  19. Observing the effect of a policy: a maintenance case

    NARCIS (Netherlands)

    Rijsdijk, Chris; Tinga, Tiedo

    2016-01-01

    Purpose – The purpose of this paper is to show that maintenance performance is potentially better predictable from recording routines. Design/methodology/approach – An attempt is made to observe an effect of a policy. Maintenance cases seem exceptional because of the efficiently obtainable evidence

  20. Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem

    Directory of Open Access Journals (Sweden)

    Jianfei Ye

    2015-01-01

    Full Text Available In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.

  1. Organizational performance comparative study of Jakarta and Medan city happy planet index

    Science.gov (United States)

    Perdamenta Tarigan, Nuah

    2018-03-01

    Comparative Study of Organizational Performance relating to the Happy Planet Index between Jakarta and Medan is quite challenging, the performance of the organization here is related to organizational arrangements relating to the potential associated with Corporate Social Responsibility (CSR), which is based on ISO 26000, how local leaders put the idea to build a city not only by the government budget each area, but also invite the participation of companies that have programs related to community empowerment is not a fund for cash, but the real form that is present in removing the great problems in society cities beyond than just its obligations but has become a conscious citizen that cares about its environment both natural and artificial. In the end of this research, we will see which one is the best based on the standard Happy Planet Index (HPI) which is phenomenal in the world now, connected again with 17 pieces of Sustainable Development Goals, particularly the goal of the 17th. The study was conducted by the research literature and implemented in a short time. However, a large study being conducted by the researcher.

  2. Outsourcing versus in-house maintenance of medical devices: a longitudinal, empirical study.

    Science.gov (United States)

    Miguel-Cruz, Antonio; Rios-Rincón, Adriana; Haugan, Gregory L

    2014-03-01

    To determine what factors have a significant influence on the performance of medical device maintenance outsourcing, and to determine how the performance of external governance structures differs depending on whether a hospital is private or public. This was a longitudinal study of 590 maintenance transactions at 20 hospitals in Bogotá, Colombia, involving 764 medical devices and 72 maintenance service providers. Maintenance performance data (i.e., turn-around time in hours; TAT) for the service providers (either in-house or outsourced) were primarily collected over a 20-month period, from December 2009-August 2011, by means of a monitoring procedure; then, a hazards model was run. The availability of specific repair parts, in-stock, in the city in which the medical devices were located, had a positive impact on the performance of both internal and external governance structures. Online service also had a positive impact on both, with a stronger positive impact on the performance of internal governance than on that of external governance. For transactions governed by external structures, better performance was seen in private hospitals than in public ones. In public health institutions, internal governance showed better performance than external governance. Both internal and external governance structures showed better performance in private healthcare institutions than in public ones. In public health institutions, internal governance shows better performance than external governance; this suggests that healthcare managers should reconsider the trend to eliminate in-house maintenance service staff in public healthcare institutions.

  3. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  4. A Framework to Determine the Effectiveness of Maintenance Strategies Lean Thinking Approach

    Directory of Open Access Journals (Sweden)

    Alireza Irajpour

    2014-01-01

    Full Text Available The purpose of this paper is to provide a framework that can identify and evaluate the effectiveness of a given maintenance strategy and to rank components of maintenance system. The framework is developed using DEMATEL method on maintenance strategy as a guideline. To gain a richer understanding of the framework, a questionnaire is constructed and answered by experts. Then the DEMATEL method is applied to analyze the importance of criteria and the casual relations among the criteria are constructed. The scope of the paper is limited to performance measurement of maintenance strategies. It is found that the framework is applicable and useful for the strategic management of the maintenance function. It is observed that the influencing and preferred infrastructures for designing Learning and Training are three components, that is, optimal maintenance, CMMS, and RCM which are interdependent on each other and are the fundamental components to realize the designed goals of maintenance process. This paper provides an overview of research and developments in the measurement of maintenance performance. Many tools and techniques have been developed in other fields. However, the applicability of those tools to maintenance function has never been tried. In that respect this topic is novel. It helps in managing maintenance more effectively.

  5. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  6. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  7. Effect of preload alternations on a new Doppler echocardiographic index of combined systolic and diastolic performance

    DEFF Research Database (Denmark)

    Møller, J E; Poulsen, S H; Egstrup, K

    1999-01-01

    The objective of the study was to assess the effect of preload alternations on a nongeometric Doppler index of combined systolic and diastolic myocardial performance (MPI). Doppler echocardiography was performed during Valsalva maneuver, passive leg lifting, and after sublingual administration of...

  8. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  9. Fusion reactor remote maintenance study. Final report

    International Nuclear Information System (INIS)

    Sniderman, M.

    1979-04-01

    An analysis of a major maintenance operation, the remote replacement of a modular sector of a tokamak reactor, was performed in substantial detail. Specific assumptions were developed which included concepts from various existing designs so that the operation which was studied includes some design features generic to any fusion reactor design. Based on the work performed in this study, the principal conclusions are: (1) It appears feasible to design a tokamak fusion reactor plant with availability comparable to existing fossil and fission plants, but this will require diligence and comprehensive planning during the complete design phase. (2) Since the total fusion program is paced by the success of each device, maintenance considerations must be incorporated into each device during design, even if the device is an experimental unit. (3) Innovative approaches, such as automatic computer controlled operations, should be developed so that large step reductions in planned maintenance times can be achieved

  10. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  11. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  12. Performance of a Water Recirculation Loop Maintenance Device and Process for the Advanced Spacesuit Water Membrane Evaporator

    Science.gov (United States)

    Steele, John W.; Rector, Tony; Bue, Grant C.; Campbell, Colin; Makinen, Janice

    2013-01-01

    A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The bed design further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.

  13. Composite Indexes Economic and Social Performance: Do they Provide Valuable Information?

    Directory of Open Access Journals (Sweden)

    Nasierowski Wojciech

    2016-01-01

    Full Text Available This paper examines the information content of the selected composite indexes, namely the Global Competitiveness Report Index, the Human Development Index, the Knowledge Economy Index, the Innovation Union Scoreboard, and the like. These indexes are examined from the viewpoint of country rankings. It is argued that these indexes provide highly similar information, which brings to question the usefulness of such a variety of approaches. This paper also explores the drawbacks of composite indexes, and questions whether these indexes can adequately serve as policy-setting mechanisms.

  14. Blood profiling of proteins and steroids during weight maintenance with manipulation of dietary protein level and glycaemic index

    DEFF Research Database (Denmark)

    Wang, Ping; Holst, Claus; Astrup, Arne

    2012-01-01

    ) blood biomarkers of dietary protein and GI levels during the weight-maintenance phase. Blood samples were collected at baseline, after 8 weeks of low-energy diet-induced weight loss and after a 6-month dietary intervention period from female continued weight losers (n 48) and weight regainers (n 48......), evenly selected from four dietary groups that varied in protein and GI levels. The blood concentrations of twenty-nine proteins and three steroid hormones were measured. The changes in analytes during weight maintenance largely correlated negatively with the changes during weight loss, with some...

  15. The issue of performance measurement in the maintenance function; Los problemas de la medicion del rendimiento en la funcion mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Galar-Pascual, D.; Berges-Muro, L. F.; Royo-Sanchez, J.

    2010-07-01

    The measurement of maintenance performance comes from a lack of basic concepts in the maintenance department of the company, and consequently, the lack of appropriate objectives emanating from the overall mission and vision towards it. It produces metrics not adopted to the real needs of the company due to the lack of knowledge about them, with a major human factor load and with no road map for the amount of data to collect, its processing and its use in decision making. For this purpose we propose a mixed model that combines the qualitative aspects of surveys, with the quantitative aspects of indicators, these ones grouped according to a framework in the form balanced scorecard adopted to the user or hierarchical level responsible for them. (Author) 20 refs.

  16. Maintenance Decision Based on Data Fusion of Aero Engines

    Directory of Open Access Journals (Sweden)

    Huawei Wang

    2013-01-01

    Full Text Available Maintenance has gained a great importance as a support function for ensuring aero engine reliability and availability. Cost-effectiveness and risk control are two basic criteria for accurate maintenance. Given that aero engines have much condition monitoring data, this paper presents a new condition-based maintenance decision system that employs data fusion for improving accuracy of reliability evaluation. Bayesian linear model has been applied, so that the performance degradation evaluation of aero engines could be realized. A reliability evaluation model has been presented based on gamma process, which achieves the accurate evaluation by information fusion. In reliability evaluation model, the shape parameter is estimated by the performance degradation evaluation result, and the scale parameter is estimated by failure, inspection, and repair information. What is more, with such reliability evaluation as input variables and by using particle swarm optimization (PSO, a stochastic optimization of maintenance decision for aircraft engines has been presented, in which the effectiveness and the accuracy are demonstrated by a numerical example.

  17. Performance of the bispectral index during electrocautery.

    Science.gov (United States)

    Chan, Matthew T V; Ho, Sin Shing; Gin, Tony

    2012-01-01

    The electroencephalogram contains small electrical signals that are vulnerable to contamination from high-frequency noise during electrocautery. The bispectral index (BIS) monitor incorporated hardware and software changes to eliminate artifacts, thus allowing BIS monitoring even in the presence of electrocautery. We evaluated the accuracy of BIS to measure anesthetic effect during electrocautery interference. Anesthesia was induced and maintained with target-controlled infusions of propofol (3 μg/mL) and remifentanil (4 ng/mL). After baseline BIS recordings, "simulated" electrocautery interference was induced continuously for 20 minutes. Five minutes after the start of electrocautery, propofol infusion was increased to achieve an effect site concentration of 6 μg/mL. Patients remained undisturbed during the study. BIS values and signal quality index were recorded continuously. During electrocautery, there was a significant decrease in signal quality index (mean difference: 16.9; 95% confidence intervals: 15.9-17.9; Pelectrocautery, there was a prompt decrease in BIS (Pelectrocautery. Rejecting and filtering artifacts from electrocautery interference reduced the ability of BIS to respond to a change in anesthetic depth. BIS values during electrocautery should be interpreted with caution.

  18. Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.

    Science.gov (United States)

    Foerster, James; And Others

    Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…

  19. Gauging a Firm's Innovative Performance Using an Integrated Structural Index for Patents

    Directory of Open Access Journals (Sweden)

    Xiaojun Hu

    2016-03-01

    Full Text Available Purpose: In this contribution we try to find new indicators to measure characteristics of a firm's patents and their influence on a company's profits. Design/methodology/approach: We realize that patent evaluation and influence on a company's profits is a complicated issue requiring different perspectives. For this reason we design two types of structural h-indices, derived from the International Patent Classification (IPC. In a case study we apply not only basic statistics but also a nested case-control methodology. Findings: The resulting indicator values based on a large dataset (19,080 patents in total from the pharmaceutical industry show that the new structural indices are significantly correlated with a firm's profits. Research limitations: The new structural index and the synthetic structural index have just been applied in one case study in the pharmaceutical industry. Practical implications: Our study suggests useful implications for patentometric studies and leads to suggestions for different sized firms to include a healthy research and development (R&D policy management. The structural h-index can be used to gauge the profits resulting from the innovative performance of a firm's patent portfolio. Originality/value: Traditionally, the breadth and depth of patents of a firm and their citations are considered separately. This approach, however, does not provide an integrated insight in the major characteristics of a firm's patents. The Sh(Y index, proposed in our investigation, can reflect a firm's innovation activities, its technological breadth, and its influence in an integrated way.

  20. Maintenance of radiation safety information system

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Sun [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Park, Moon Il; Chung, Chong Kyu; Lim, Bock Soo; Kim, Hyung Uk; Chang, Kwang Il; Nam, Kwan Hyun; Cho, Hye Ryan [AD center incubation LAB, Taejon (Korea, Republic of)

    2001-12-15

    The objectives of radiation safety information system maintenance are to maintain the requirement of users, change of job process and upgrade of the system performance stably and effectively while system maintenance. We conduct the code of conduct recommended by IAEA, management of radioisotope inventory database systematically using analysis for the state of inventory database integrated in this system. This system and database will be support the regulatory guidance, rule making and information to the MOST, KINS, other regulatory related organization and general public optimizationally.

  1. Weight loss maintenance: A review on dietary related strategies

    Directory of Open Access Journals (Sweden)

    Fatemeh Azizi Soeliman

    2014-01-01

    Full Text Available Background: Weight regain after weight loss is a common problem for all those obese or overweight who have had a recent weight loss. Different cures such as diet therapy, behavioral therapy, exercise or a mixture of them have been advised as solutions. The purpose of this review is to find the best diet or eating pattern to maintain a recent weight loss. Materials and Methods: We searched in PubMed and SCOPUS by using the following key words: Overweight, obesity, weight maintenance, weight regain, and diet therapy. Finally, we assessed 26 articles in the present article. Results: Meal replacement, low carbohydrate-low glycemic index (GI diet, high protein intake, and moderate fat consumption have shown some positive effects on weight maintenance. However, the results are controversial. A Dietary Approach to Stop Hypertension (DASH-type diet seems helpful for weight maintenance although the need for more study has remained. Some special behaviors were associated with less weight regain, such as, not being awake late at night, drinking lower amount of sugar-sweetened beverages, and following a healthy pattern. Some special foods have been suggested for weight maintenance. However, the roles of specific foods are not confirmed. Conclusion: Healthy diets recommend low carbohydrate, low GI, and moderate fat foods, but it is not clear whether they are useful in preventing weight gain. It seems that consuming fewer calories helps people to keep weight loss. Further research to find strategies in obesity management focusing on successful maintenance of weight loss is needed.

  2. Improvement of the myocardial performance index in atrial fibrilation patients treated with amiodarone after cardioversion.

    Science.gov (United States)

    Besli, Feyzullah; Basar, Cengiz; Kecebas, Mesut; Turker, Yasin

    2015-03-01

    This study evaluated the response to electrical cardioversion (EC) and the effect on the myocardial performance index (MPI) in patients with persistent and long-standing persistent atrial fibrillation (AF). We enrolled 103 patients (mean age 69.6 ± 8.9 years, 40.7% males) with a diagnosis of persistent and long-standing persistent AF. EC was applied to all patients after one g of amiodarone administration. Echocardiographic findings before EC were compared in patients with successful versus unsuccessful cardioversions and in patients with maintained sinus rhythm (SR) versus those with AF recurrence at the end of the first month. We also compared echocardiographic data before EC versus at the end of the first month in the same patients with maintained SR. SR was achieved in 72.8% of patients and was continued at the end of the first month in 69.3% of the patients. The MPI value of all patients was found to be 0.73 ± 0.21. The size of the left atrium was determined to be an independent predictor of the maintenance of SR at 1 month. In subgroup analyses, when we compared echocardiographic findings before EC and at the end of the first month in patients with maintained SR, the MPI (0.66 ± 0.14 vs 0.56 ± 0.09, p < 0.001) values were significantly decreased. Our study is the first to show impairment of the MPI, which is an indicator of systolic and diastolic function, in patients with persistent and long-standing persistent AF and improvement of the MPI after successful EC.

  3. Application of plant Technology Knowledge Infrastructure to plant engineering and maintenance

    International Nuclear Information System (INIS)

    Kawanaka, Tsutomu; Tamaki, Yuji; Ota, Yoshimi; Yoshinaga, Toshiaki

    2006-01-01

    Management and maintenance tools are now greatly available for contributing reduction of maintenance cost and time. These tools surely give us much benefit, but are only for maintaining reliabilities of the equipment. Reliability of the plant depends on the design and actual operating conditions. Accordingly, the matter to do first is to consider facilities in the range of the plant life cycle. This brings the result that 'process property' and 'functional property' are required besides 'equipment property' which has been used for the evaluation index. Because these properties are formed at the designing stage, the beginning of the life cycle, and by applying the equipment function to them, maintenance cost can be reduced without risk increasing. To execute this subject, it is strongly required to accumulate information and data, to build up the Technology Knowledge Infrastructure. This paper reports the system and the way of applying the method to the actual plants. (author)

  4. Proposal of an environmental performance index to assess solid waste treatment technologies.

    Science.gov (United States)

    Coelho, Hosmanny Mauro Goulart; Lange, Liséte Celina; Coelho, Lineker Max Goulart

    2012-07-01

    Although the concern with sustainable development and environment protection has considerably grown in the last years it is noted that the majority of decision making models and tools are still either excessively tied to economic aspects or geared to the production process. Moreover, existing models focus on the priority steps of solid waste management, beyond waste energy recovery and disposal. So, in order to help the lack of models and tools aiming at the waste treatment and final disposal, a new concept is proposed: the Cleaner Treatment, which is based on the Cleaner Production principles. This paper focuses on the development and validation of the Cleaner Treatment Index (CTI), to assess environmental performance of waste treatment technologies based on the Cleaner Treatment concept. The index is formed by aggregation (summation or product) of several indicators that consists in operational parameters. The weights of the indicator were established by Delphi Method and Brazilian Environmental Laws. In addition, sensitivity analyses were carried out comparing both aggregation methods. Finally, index validation was carried out by applying the CTI to 10 waste-to-energy plants data. From sensitivity analysis and validation results it is possible to infer that summation model is the most suitable aggregation method. For summation method, CTI results were superior to 0.5 (in a scale from 0 to 1) for most facilities evaluated. So, this study demonstrates that CTI is a simple and robust tool to assess and compare the environmental performance of different treatment plants being an excellent quantitative tool to support Cleaner Treatment implementation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  5. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  6. The Stock Performance of C. Everett Koop Award Winners Compared With the Standard & Poor's 500 Index.

    Science.gov (United States)

    Goetzel, Ron Z; Fabius, Raymond; Fabius, Dan; Roemer, Enid C; Thornton, Nicole; Kelly, Rebecca K; Pelletier, Kenneth R

    2016-01-01

    To explore the link between companies investing in the health and well-being programs of their employees and stock market performance. Stock performance of C. Everett Koop National Health Award winners (n = 26) was measured over time and compared with the average performance of companies comprising the Standard and Poor's (S&P) 500 Index. The Koop Award portfolio outperformed the S&P 500 Index. In the 14-year period tracked (2000-2014), Koop Award winners' stock values appreciated by 325% compared with the market average appreciation of 105%. This study supports prior and ongoing research demonstrating a higher market valuation--an affirmation of business success by Wall Street investors--of socially responsible companies that invest in the health and well-being of their workers when compared with other publicly traded firms.

  7. Performance of Dual-Axis Solar Tracker versus Static Solar System by Segmented Clearness Index in Malaysia

    Directory of Open Access Journals (Sweden)

    Jhee Fhong Lee

    2013-01-01

    Full Text Available The performance of Dual-Axis Solar Tracker (DAST and Static Solar System (SSS with respect to clearness index in Malaysia is presented. An attempt to investigate the correlation between clearness index with energy gain and efficiency of DAST over SSS is being done experimentally. A good correlation could not be found out from the daily clearness index. It is due to the more profound advantage of DAST in the morning and evening compared to midday as it is able to follow the sun’s position. Hence, the daily clearness index is divided into three segments which are morning, midday, and evening to interpret the energy gain and efficiency better. A clearer correlation with low standard deviation can be observed on the segmented clearness index analysis. The energy gain and efficiency of seven cities in Malaysia is being estimated with the segmented clearness index and compared to the result generated from anisotropic radiation model. A similar trend is obtained and it has shown that the segmented clearness index could be utilized as a graphical method for estimation of energy gain and efficiency of DAST over SSS.

  8. Rehospitalizations and Emergency Department Visits after Hospital Discharge in Patients Receiving Maintenance Hemodialysis.

    Science.gov (United States)

    Harel, Ziv; Wald, Ron; McArthur, Eric; Chertow, Glenn M; Harel, Shai; Gruneir, Andrea; Fischer, Hadas D; Garg, Amit X; Perl, Jeffrey; Nash, Danielle M; Silver, Samuel; Bell, Chaim M

    2015-12-01

    Clinical outcomes after a hospital discharge are poorly defined for patients receiving maintenance in-center (outpatient) hemodialysis. To describe the proportion and characteristics of these patients who are rehospitalized, visit an emergency department, or die within 30 days after discharge from an acute hospitalization, we conducted a population-based study of all adult patients receiving maintenance in-center hemodialysis who were discharged between January 1, 2003, and December 31, 2011, from 157 acute care hospitals in Ontario, Canada. For patients with more than one hospitalization, we randomly selected a single hospitalization as the index hospitalization. Of the 11,177 patients included in the final cohort, 1926 (17%) were rehospitalized, 2971 (27%) were treated in the emergency department, and 840 (7.5%) died within 30 days of discharge. Complications of type 2 diabetes mellitus were the most common reason for rehospitalization, whereas heart failure was the most common reason for an emergency department visit. In multivariable analysis using a cause-specific Cox proportional hazards model, the following characteristics were associated with 30-day rehospitalization: older age, the number of hospital admissions in the preceding 6 months, the number of emergency department visits in the preceding 6 months, higher Charlson comorbidity index score, and the receipt of mechanical ventilation during the index hospitalization. Thus, a large proportion of patients receiving maintenance in-center hemodialysis will be readmitted or visit an emergency room within 30 days of an acute hospitalization. A focus on improving care transitions from the inpatient setting to the outpatient dialysis unit may improve outcomes and reduce healthcare costs. Copyright © 2015 by the American Society of Nephrology.

  9. Lifecycle performance. Special issue on management and maintenance, hybrid ventilation concepts, installation-low buildings; Lifecycle performance. Themanummer over beheer en onderhoud, hybride ventilatieconcepten, installatie-arme gebouwen

    Energy Technology Data Exchange (ETDEWEB)

    Thierauf, I. [Universiteit Utrecht, Utrecht (Netherlands); Kurvers, S.R.; Van den Ham, E.R.; Leijten, J.L. [Sectie Climate Design and Sustainability, Afdeling Architectural Engineering and Technology, Faculteit Bouwkunde, Technische Universiteit Delft TUD, Delft (Netherlands); Juricic, S. [Ecole National des Travaux Publics de l' Etat, Lyon (France); Jacobs, P. [Afdeling Energy and Comfort Systems, TNO, Delft (Netherlands); Versteeg, H. [LBP Sight, Nieuwegein (Netherlands); Van Loon, P.P.M. [Stichting Scholen van Morgen, Rotterdam (Netherlands); Hoek, H.C.; Van Eeden, H.; Nibbelink, J. [Collectief C-on, Haarlem (Netherlands); Veerman, J.; Maassen, W.H. [Royal Haskoning DHV, Nijmegen (Netherlands); Derksen, A.H.P. [ISSO, Rotterdam (Netherlands); Morren, K. [Universiteit Twente, Enschede (Netherlands)

    2012-12-15

    In 9 articles various aspects regarding the title topic are discussed: energy efficiency and user comfort, ventilation in new houses with balanced ventilation, the revised assessment for ventilation performance, air quality in school buildings, buildings with only a few installations, hybrid ventilation, the management and maintenance process, and future performance requirements [Dutch] In 9 artikelen wordt aandacht besteed aan diverse aspecten m.b.t. het titelonderwerp: energie-efficientie en gebruikerscomfort, ventilatie in nieuwbouwwoningen met balansventilatie, de herziene beoordelingsrichtlijn ventilatie prestatie, luchtkwaliteit in schoolgebouwen, installatie-arme gebouwen, hybride ventilatie, het beheer- en onderhoudsproces, en de toekomstige prestatie-eisen.

  10. Study on Effect of Number of Transparent Covers and Refractive Index on Performance of Solar Water Heater

    Directory of Open Access Journals (Sweden)

    B. Kalidasan

    2014-01-01

    Full Text Available Liquid flat plate collector (solar flat plate collector is one of the important applications in solar thermal system. The development in solar photovoltaic is an emerging challenge for the solar thermal system. In the current work an attempt has been made to optimize the number of transparent covers and refractive index to improve the optical efficiency and thermal efficiency for the collector. Performance of the liquid flat plate collector at VIT University Vellore has been simulated numerically for January 21st at an interval of half an hour with different numbers of transparent covers (0–3 and different refractive index values ranging from 1.1 to 1.7. The formulation and solutions are developed with simple software Microsoft Office Excel to result the performance characteristics. The result shows that the efficiency of the flat plate collector increases with an increase in number of covers and decreases after an optimum number of covers. It also decreases with an increase in refractive index. The combination of optimum number (two and lower refractive index (1.1 results improved useful heat.

  11. The relation between flexibility of human resources and performance indexes of selected hospitals of Tehran Medical Sciences University

    Directory of Open Access Journals (Sweden)

    Noushin Alibakhshi

    2016-12-01

    Full Text Available Today, flexibility has turned to one of important issues in management theories and policies and most current discussions about flexibility patterns focus on management policies, so that these patterns are one of important aspects of human resources strategic management. This study was performed with the aim of assessing the flexibility rate of human resources and performance indexes of Tehran Medical Sciences University hospitals and determining the possible relation between these variables. The present study is descriptive – analytical which was conducted in cross-sectional form in 2015. The statistical population was selected by stratifies random sampling method as 317 persons from nursing, administrative and financial personnel of 5 hospitals of Tehran Medical Sciences University. Data collecting toll was hospitals performance indexes form and Wright & Snell flexibility questionnaire of human resources. Data analysis was performed using SPSS 18 software and with the aid of descriptive statistical indexes and linear regression analysis. The results showed that personnel ( human resources had high flexibility = 4.16.\tthere was a significant relation between total flexibility and the index of bed circulation so that by one unit increase in bed circulation space, normally, the average of total flexibility decreased 0.64 units ( p-value<0.05. The results showed that human resources of Tehran Medical Sciences University hospitals have high flexibility, so authorities and policy makers are suggested to adopt policies of human resources management for creating flexibility in human resources and improving hospitals performance and amending hospitals status.

  12. Remote maintenance challenges presented in the ITER engineering design

    International Nuclear Information System (INIS)

    Burgess, T.W.; Herndon, J.N.; Schrock, S.L.; Lousteau, D.C.

    1995-01-01

    Leading fusion energy research institutions are currently engaged in the Engineering Design Activity for the International Thermonuclear Experimental Reactor (ITER). A tokamak reactor design is evolving which emphasizes high system performance in a minimum overall reactor and building size. The resulting high component density dictates careful attention to ITER remote maintenance considerations in the development of the configuration. The complexity and scale of ITER remote maintenance tasks are well beyond the scope of today's experience and technology. This paper discusses the remote maintenance philosophy, describes the basic configuration as it relates to maintenance, and describes the basic procedures and equipment required. Key enabling technology research and development needs are also addressed

  13. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  14. Evaluation and comparison of alternative fleet-level selective maintenance models

    International Nuclear Information System (INIS)

    Schneider, Kellie; Richard Cassady, C.

    2015-01-01

    Fleet-level selective maintenance refers to the process of identifying the subset of maintenance actions to perform on a fleet of repairable systems when the maintenance resources allocated to the fleet are insufficient for performing all desirable maintenance actions. The original fleet-level selective maintenance model is designed to maximize the probability that all missions in a future set are completed successfully. We extend this model in several ways. First, we consider a cost-based optimization model and show that a special case of this model maximizes the expected value of the number of successful missions in the future set. We also consider the situation in which one or more of the future missions may be canceled. These models and the original fleet-level selective maintenance optimization models are nonlinear. Therefore, we also consider an alternative model in which the objective function can be linearized. We show that the alternative model is a good approximation to the other models. - Highlights: • Investigate nonlinear fleet-level selective maintenance optimization models. • A cost based model is used to maximize the expected number of successful missions. • Another model is allowed to cancel missions if reliability is sufficiently low. • An alternative model has an objective function that can be linearized. • We show that the alternative model is a good approximation to the other models

  15. Bayesian hypothesis testing and the maintenance rule

    International Nuclear Information System (INIS)

    Kelly, D.L.

    1997-01-01

    The Maintenance Rule (10 CFR 50.65) went into effect in the United States in July 1996. It requires commercial nuclear utilities to monitor system performance (system reliability and maintenance unavailability) for systems that are determined by the utility to be important to plant safety. Utilities must set performance goals for such systems and monitor system performance against these goals. In addition, these performance goals are intended to be commensurate with the safety significance of the system, which can be established by a probabilistic safety assessment of the plant. The author examines the frequents approach to monitoring performance, which is being used by several utilities, and proposes an alternative Bayesian approach. The Bayesian approach makes more complete use of the information in the probabilistic safety assessment, is consistent philosophically with the subjective interpretation given to probability in most probabilistic safety assessments, overcomes several pitfalls in the frequents approach, provides results which are easily interpretable, and is straightforward to implement using the information in the probabilistic safety assessment

  16. Development and Examination of an Alternative School Performance Index in South Carolina. REL 2015-097

    Science.gov (United States)

    Koon, Sharon; Petscher, Yaacov; Hughes, John

    2015-01-01

    The purpose of this study was to examine the extent to which the measures that make up each of the three separate accountability indices of school performance in South Carolina could be used to create an overall, reliable index of school performance. Data from public elementary, middle, and high schools in 2012/13 were used in confirmatory factor…

  17. Outsourcing versus in-house maintenance of medical devices: a longitudinal, empirical study

    Directory of Open Access Journals (Sweden)

    Antonio Miguel-Cruz

    2014-03-01

    Full Text Available OBJECTIVE: To determine what factors have a significant influence on the performance of medical device maintenance outsourcing, and to determine how the performance of external governance structures differs depending on whether a hospital is private or public. METHODS: This was a longitudinal study of 590 maintenance transactions at 20 hospitals in Bogotá, Colombia, involving 764 medical devices and 72 maintenance service providers. Maintenance performance data (i.e., turn-around time in hours; TAT for the service providers (either in-house or outsourced were primarily collected over a 20-month period, from December 2009-August 2011, by means of a monitoring procedure; then, a hazards model was run. RESULTS: The availability of specific repair parts, in-stock, in the city in which the medical devices were located, had a positive impact on the performance of both internal and external governance structures. Online service also had a positive impact on both, with a stronger positive impact on the performance of internal governance than on that of external governance. For transactions governed by external structures, better performance was seen in private hospitals than in public ones. In public health institutions, internal governance showed better performance than external governance. Both internal and external governance structures showed better performance in private healthcare institutions than in public ones. CONCLUSIONS: In public health institutions, internal governance shows better performance than external governance; this suggests that healthcare managers should reconsider the trend to eliminate in-house maintenance service staff in public healthcare institutions.

  18. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  19. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  20. The relationship of centralization, organizational culture and performance indexes in teaching hospitals affiliated to Tehran University of Medical Sciences.

    Science.gov (United States)

    Nasirpour, Amir Ashkan; Gohari, Mahmoud Reza; Moradi, Saied

    2010-01-01

    One of the main problems in the efficiency and efficacy of an organization is its structural issue. Organizational culture is also considered as an effective factor in the performance of many organizations. The main goal of the present study was to determine the relationship of Centralization and organizational culture and performance indexes in Teaching Hospitals affiliated to Tehran University of Medical Sciences. This correlation study was performed in the year 2007. The population studied consisted of 4408 personnel from 13 hospitals among whom 441 subjects were selected and studied via a class sampling method. Data was compiled using a check list concerning the evaluation status of Centralization and another form concerning performance indexes as well as Robbin's organizational culture questionnaire. Data were obtained from the subjects by self answering and analyzed by using descriptive statistical indexes, T- test and Fisher's exact tests. Among the organizational culture indexes of the hospitals studied, control and organizational identity was better as compared to others (mean=3.32 and 3.30). Concerning the extent of Centralization in the hospitals studied, 53.85 % and 46.15 % were reported to have upper and lower organizational Centralization, respectively. Mean ratio of surgical operations to inpatients was 40%, the mean rate of admissions per active bed was 60.83, mean bed occupancy coefficient was 70.79%, average length of stay was 6.96 days, and mean net death rate was 1.41%. No significant correlation was seen between Centralization degree, organizational culture and performance indexes in teaching hospitals Tehran university of medical sciences. (with 95% confidence interval). Due to the fact that first grade Teaching hospitals use board certified members, expert personnel, and advanced equipments and because of the limitation of patients choice and, the extent of Centralization and many organizational culture components have no significant

  1. National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fewell, N.

    1993-12-01

    The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

  2. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  3. A Proposal for New Microclimate Indexes for the Evaluation of Indoor Air Quality in Museums

    Directory of Open Access Journals (Sweden)

    Eva Schito

    2016-10-01

    Full Text Available A correct artwork preservation requires strict values of several microclimate parameters, in particular temperature, humidity, and light. In existing museums, the evaluation of the effectiveness of current building plant systems and management is essential to avoid artwork deterioration. In this work, we propose the use of five simple performance indexes that use monitored data to estimate the suitability of the whole museum system in the maintenance of benchmark values of temperature, humidity, and light. The new indexes also take into account microclimate daily span and spatial homogeneity, which can represent a criticality in the preservative process. We apply these new indexes to the results of a monitoring campaign in Palazzo Blu, a museum in Pisa, which lasted for almost four months during a temporary exhibition on Toulouse-Lautrec works. The indexes show a mainly acceptable instantaneous microclimate, but HVAC (Heating, Ventilating and Air Conditioning system improvement is necessary to avoid high thermo-hygrometric daily span. This methodology is useful for the identification of microclimate criticalities and can help the cooperation between conservation experts and professionals giving hints to improve museum internal microclimate. In case ofalready optimal microclimate, these indexes can be useful in more complex analyses, including simulations of possible retrofit actions, keeping microclimate suitability as a constraint.

  4. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  5. Where does “whichever occurs first” hold for preventive maintenance modelings?

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Liu, Hu-Chen; Nakagawa, Toshio

    2015-01-01

    The purpose of this paper is to observe where the classical assumption “whichever occurs first” holds for preventive maintenance (PM) modelings. We firstly take up a bivariate maintenance policy where “whichever occurs first” and the newly proposed “whichever occurs last” are respectively used. Modification of PM performance is introduced into modelings to avoid interruptions of job executions, that is, PMs are done only at the end of working cycles. From the points of performability and maintenance cost, we secondly compare the optimized “first” and “last” policies in detail and find two critical points of comparisons analytically. Further, by comparing the “first” and “last” policies with the standard maintenance, modified PM costs are obtained to observe whether it is easy to save PM cost for “whichever occurs first”. For a trivariate maintenance policy, we thirdly propose an entirely new assumption “whichever occurs middle” and give another one model that considers both assumptions of “first” and “last”. We analyze maintenance probabilities for each model and then obtain directly their expected maintenance cost rates for further studies. - Highlights: • A bivariate maintenance policy based on “whichever occurs first” is improved. • Two comparisons of “whichever occurs first and last” are made. • Modified maintenance costs are obtained to observe which policy could save more costs. • New assumption “whichever occurs middle” for the trivariate maintenances is proposed. • One policy is modeled by considering both assumptions of “first” and “last”

  6. Cognitive Reserve and Brain Maintenance: Orthogonal Concepts in Theory and Practice.

    Science.gov (United States)

    Habeck, C; Razlighi, Q; Gazes, Y; Barulli, D; Steffener, J; Stern, Y

    2017-08-01

    Cognitive Reserve and Brain Maintenance have traditionally been understood as complementary concepts: Brain Maintenance captures the processes underlying the structural preservation of the brain with age, and might be assessed relative to age-matched peers. Cognitive Reserve, on the other hand, refers to how cognitive processing can be performed regardless of how well brain structure has been maintained. Thus, Brain Maintenance concerns the "hardware," whereas Cognitive Reserve concerns "software," that is, brain functioning explained by factors beyond mere brain structure. We used structural brain data from 368 community-dwelling adults, age 20-80, to derive measures of Brain Maintenance and Cognitive Reserve. We found that Brain Maintenance and Cognitive were uncorrelated such that values on one measure did not imply anything about the other measure. Further, both measures were positively correlated with verbal intelligence and education, hinting at formative influences of the latter to both measures. We performed extensive split-half simulations to check our derived measures' statistical robustness. Our approach enables the out-of-sample quantification of Brain Maintenance and Cognitive Reserve for single subjects on the basis of chronological age, neuropsychological performance and structural brain measures. Future work will investigate the prognostic power of these measures with regard to future cognitive status. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  7. Determination of Pareto frontier in multi-objective maintenance optimization

    International Nuclear Information System (INIS)

    Certa, Antonella; Galante, Giacomo; Lupo, Toni; Passannanti, Gianfranco

    2011-01-01

    The objective of a maintenance policy generally is the global maintenance cost minimization that involves not only the direct costs for both the maintenance actions and the spare parts, but also those ones due to the system stop for preventive maintenance and the downtime for failure. For some operating systems, the failure event can be dangerous so that they are asked to operate assuring a very high reliability level between two consecutive fixed stops. The present paper attempts to individuate the set of elements on which performing maintenance actions so that the system can assure the required reliability level until the next fixed stop for maintenance, minimizing both the global maintenance cost and the total maintenance time. In order to solve the previous constrained multi-objective optimization problem, an effective approach is proposed to obtain the best solutions (that is the Pareto optimal frontier) among which the decision maker will choose the more suitable one. As well known, describing the whole Pareto optimal frontier generally is a troublesome task. The paper proposes an algorithm able to rapidly overcome this problem and its effectiveness is shown by an application to a case study regarding a complex series-parallel system.

  8. Performance Analysis of Indonesia’s Mining Sector Price Index

    Directory of Open Access Journals (Sweden)

    Hastra Reza Satyatama

    2017-07-01

    Full Text Available Subprime mortage’s crisis in United States 2008 giving effect to the global capital markets especially the stock price index of the mining sector Indonesia. This research analyzes the effect of BI Rate, exchange rate, world gold price, crude oil price, and Dow Jones Industrial Average on the stock price index of the mining sector. This research employs time series monthly data of 2009-2016 with Error Correction Model-Engle Granger (ECM-EG as the method. The analysis showed that the BI rate, exchange rate and world gold price, has a negative and significant effect. World oil prices affect positively but not significant meanwhile the Dow Jones Industrial Average has a positive and significant impact on the stock price index of the mining sector. For investors in the mining sector, should pay attention to the exchange rate of the rupiah and Dow Jones Index significantly in the mining sector of the stock price index.DOI: 10.15408/sjie.v6i2.5395 

  9. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  10. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Honda, T.; Davis, F.; Lousteau, D.

    1991-01-01

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  11. Maintenance modeling and optimization integrating human and material resources

    International Nuclear Information System (INIS)

    Martorell, S.; Villamizar, M.; Carlos, S.; Sanchez, A.

    2010-01-01

    Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.

  12. Maintenance modeling and optimization integrating human and material resources

    Energy Technology Data Exchange (ETDEWEB)

    Martorell, S., E-mail: smartore@iqn.upv.e [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Villamizar, M.; Carlos, S. [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Sanchez, A. [Dpto. Estadistica e Investigacion Operativa Aplicadas y Calidad, Universidad Politecnica Valencia (Spain)

    2010-12-15

    Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.

  13. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  14. Perpetual pavement – absorbing stress and functional maintenance

    Directory of Open Access Journals (Sweden)

    Rong Gao

    2017-03-01

    Full Text Available Perpetual Pavement combines the well documented smoothness and safety advantages of asphalt with an advanced, multi-layer paving design process, that with routine maintenance, extends the useful life of a roadway. Perpetual provides long lasting road and smoothness for the construction purposes. This study has the design key points of perpetual pavement based on the idea of life cycle, which has a new direction for the new highway construction, reconstruction and expansion. First, the structure of long life pavement design is studied to analyze the effect of stress absorbing layer. Second, researches on stress absorbing layer from the aspects of raw materials, mix proportion are implemented. Third, the design index of stress absorbing layer is determined by the shear strength test. The results show that the design idea of composite perpetual pavement can be realized by reasonable design of the stress absorbing layer and carrying out the surface functional maintenance can ensure the pavement to avoid structural damage in the operation stage.

  15. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  16. The Stock Performance of C. Everett Koop Award Winners Compared With the Standard & Poor's 500 Index

    Science.gov (United States)

    Goetzel, Ron Z.; Fabius, Raymond; Fabius, Dan; Roemer, Enid C.; Thornton, Nicole; Kelly, Rebecca K.; Pelletier, Kenneth R.

    2016-01-01

    Objective: To explore the link between companies investing in the health and well-being programs of their employees and stock market performance. Methods: Stock performance of C. Everett Koop National Health Award winners (n = 26) was measured over time and compared with the average performance of companies comprising the Standard and Poor's (S&P) 500 Index. Results: The Koop Award portfolio outperformed the S&P 500 Index. In the 14-year period tracked (2000–2014), Koop Award winners’ stock values appreciated by 325% compared with the market average appreciation of 105%. Conclusions: This study supports prior and ongoing research demonstrating a higher market valuation—an affirmation of business success by Wall Street investors—of socially responsible companies that invest in the health and well-being of their workers when compared with other publicly traded firms. PMID:26716843

  17. Statistical inference for the lifetime performance index based on generalised order statistics from exponential distribution

    Science.gov (United States)

    Vali Ahmadi, Mohammad; Doostparast, Mahdi; Ahmadi, Jafar

    2015-04-01

    In manufacturing industries, the lifetime of an item is usually characterised by a random variable X and considered to be satisfactory if X exceeds a given lower lifetime limit L. The probability of a satisfactory item is then ηL := P(X ≥ L), called conforming rate. In industrial companies, however, the lifetime performance index, proposed by Montgomery and denoted by CL, is widely used as a process capability index instead of the conforming rate. Assuming a parametric model for the random variable X, we show that there is a connection between the conforming rate and the lifetime performance index. Consequently, the statistical inferences about ηL and CL are equivalent. Hence, we restrict ourselves to statistical inference for CL based on generalised order statistics, which contains several ordered data models such as usual order statistics, progressively Type-II censored data and records. Various point and interval estimators for the parameter CL are obtained and optimal critical regions for the hypothesis testing problems concerning CL are proposed. Finally, two real data-sets on the lifetimes of insulating fluid and ball bearings, due to Nelson (1982) and Caroni (2002), respectively, and a simulated sample are analysed.

  18. Browse Title Index

    African Journals Online (AJOL)

    Vol 9, No 6S (2017), The effect of illumination compensation methods with histogram .... total productive maintenance with six sigma on supply chain performance ... Vol 9, No 5S (2017): Special Issue, The influence of core competency skills of ...

  19. The Report of Maintenance and Management Optimization for the Korean Fossil Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Ha, J.S.; Yoo, K.B.; Chung, H.; Chang, S.H. [Korea Electric Power Research Institute, Taejon (Korea)

    2002-07-01

    For the Korean fossil power plants, the main component and facillities were classified by maintainability, reliability, production, cost model to assess the cost effective performance of a power plant's maintenance. Maintenance program interacts with the generation process and estimates the leverage provided by expenditures on preventive maintenance. This optimization method is an engineering tool for tracking each asset's production and cost performance under appropriate engineering approximations. Thus, it provides useful insights into where maintenance resources can be expended most effectively to increase generation and reduce operating costs. (author). 7 refs., 3 tabs.

  20. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  1. NASA work unit system file maintenance manual

    Science.gov (United States)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  2. Maintenance viewpoint of a successful reactor program

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Grygiel, M.L.

    1984-05-01

    As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions

  3. New Models for Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.

    component that was causing a large amount of downtime were identified. Further analysis with the Reliability-Centred Maintenance concept helped determine the most appropriate maintenance strategy. In the final perspective, long-term strategic decisions were the focus. Asset Management and especially Asset...... Life-Cycle Management were studied using a case study. The case study analysis was used to generate strategies to help managers perform maintenance more proactively and to prepare the management of the offshore wind farm turbines for the future. Existing literature on Asset Life-Cycle Management has......Operations and maintenance (O&M) processes are important for keeping offshore wind turbines in operation. Costs related to such activities constitute approximately 30% of the lifetime cost of an offshore wind farm project. Currently, the offshore wind energy industry has shown a rapid increase...

  4. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Schwan, C.A.; Morgan, T.A.

    1991-04-01

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  5. Measuring Academic Performance for Healthcare Researchers with the H Index: Which Search Tool Should Be Used?

    Science.gov (United States)

    Patel, Vanash M.; Ashrafian, Hutan; Almoudaris, Alex; Makanjuola, Jonathan; Bucciarelli-Ducci, Chiara; Darzi, Ara; Athanasiou, Thanos

    2013-01-01

    Objectives To compare H index scores for healthcare researchers returned by Google Scholar, Web of Science and Scopus databases, and to assess whether a researcher's age, country of institutional affiliation and physician status influences calculations. Subjects and Methods One hundred and ninety-five Nobel laureates in Physiology and Medicine from 1901 to 2009 were considered. Year of first and last publications, total publications and citation counts, and the H index for each laureate were calculated from each database. Cronbach's alpha statistics was used to measure the reliability of H index scores between the databases. Laureate characteristic influence on the H index was analysed using linear regression. Results There was no concordance between the databases when considering the number of publications and citations count per laureate. The H index was the most reliably calculated bibliometric across the three databases (Cronbach's alpha = 0.900). All databases returned significantly higher H index scores for younger laureates (p < 0.0001). Google Scholar and Web of Science returned significantly higher H index for physician laureates (p = 0.025 and p = 0.029, respectively). Country of institutional affiliation did not influence the H index in any database. Conclusion The H index appeared to be the most consistently calculated bibliometric between the databases for Nobel laureates in Physiology and Medicine. Researcher-specific characteristics constituted an important component of objective research assessment. The findings of this study call to question the choice of current and future academic performance databases. PMID:22964880

  6. Measuring lean implementation for maintenance service companies

    NARCIS (Netherlands)

    de Jong, Stephan J.; Beelaerts van Blokland, W.W.A.

    2016-01-01

    Purpose – Implementation of lean manufacturing is currently performed in the production industry; however, for the airline maintenance service industry, it is still in its infancy. Indicators such as work in process, cycle time, on-time performance and inventory are useful indicators to measure

  7. Aircraft Maintenance Engineering: Factors Impacting Airlines E-Maintenance Technologies, Authoring and Illustrations

    Science.gov (United States)

    Karayianes, Frank

    The purpose of this research was to evaluate factors influencing acceptance and use of technologies in the field of aircraft maintenance authoring, graphics, and documentation. Maintenance engineering authors convert complex engineering used in aircraft production and transform that data using technology (tools) into usable technical publications data. While the current literature includes a large volume of research in technology acceptance in various domains of industry and business, the problem is that no such studies exist with respect to the aircraft maintenance engineering authoring, allowing any number of tools to be used and acceptance to be unsure. The study was based on theoretical approaches of the Technology Acceptance Model and the associated hypothesis related to eight research questions. A survey questionnaire was developed for data collection from a selected population of aircraft maintenance engineering authors. Data collected from 148 responses were exposed to a range of statistical methods and analyses. Analysis of data were performed within the structural equation model using exploratory factor analysis, confirmatory factor analysis, and a range of regression methods. The analyses generally provided results consistent with prior literature. Two survey questions yielded unexpected results contrary to similar studies. The relationship between prior experience and job level did not show a significant relationship with perceived usefulness or perceived ease of use. Other results included the significant relationship between Perceived Usefulness and Perceived Ease of Use with Technology acceptance. Recommendations include understanding how Technology Acceptance can be improved for the industry and the need for further research not covered to refine recommendations for technology acceptance related to the aviation industry.

  8. Performance comparison of different graylevel image fusion schemes through a universal image quality index

    NARCIS (Netherlands)

    Toet, A.; Hogervorst, M.A.

    2003-01-01

    We applied a recently introduced universal image quality index Q that quantifies the distortion of a processed image relative to its original version, to assess the performance of different graylevel image fusion schemes. The method is as follows. First, we adopt an original test image as the

  9. Model Complexity and Out-of-Sample Performance: Evidence from S&P 500 Index Returns

    NARCIS (Netherlands)

    Kaeck, Andreas; Rodrigues, Paulo; Seeger, Norman J.

    We apply a range of out-of-sample specification tests to more than forty competing stochastic volatility models to address how model complexity affects out-of-sample performance. Using daily S&P 500 index returns, model confidence set estimations provide strong evidence that the most important model

  10. Quantitative Analysis of Criteria in University Building Maintenance in Malaysia

    Directory of Open Access Journals (Sweden)

    Olanrewaju Ashola Abdul-Lateef

    2010-10-01

    Full Text Available University buildings are a significant part of university assets and considerable resources are committed to their design, construction and maintenance. The core of maintenance management is to optimize productivity and user satisfaction with optimum resources. An important segment in the maintenance management system is the analysis of criteria that influence building maintenance. Therefore, this paper aims to identify quantify, rank and discuss the criteria that influence maintenance costs, maintenance backlogs, productivity and user satisfaction in Malaysian university buildings. The paper reviews the related literature and presents the outcomes of a questionnaire survey. Questionnaires were administered on 50 university maintenance organizations. Thirty-one criteria were addressed to the university maintenance organizations to evaluate the degree to which each of the criteria influences building maintenance management. With a 66% response rate, it was concluded that the consideration of the criteria is critical to the university building maintenance management system. The quality of components and materials, budget constraints and the age of the building were found to be the most influential criteria but information on user performance satisfaction, problems associated with in-house workforce and shortage of materials and components were the least influential criteria. The paper also outlined that maintenance management is a strategic function in university administration.

  11. Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design

    Energy Technology Data Exchange (ETDEWEB)

    Professor Neill Todreas

    2001-10-01

    A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team

  12. The association between body mass index and academic performance

    Directory of Open Access Journals (Sweden)

    Khaled A. Alswat

    2017-02-01

    Full Text Available Objectives: To examine the relation between body mass index (BMI and the academic performance of students from Taif city, Kingdom of Saudi Arabia (KSA using the grade point average (GPA. Method: A cross-sectional study that includes students from intermediate and high schools located in Taif city, KSA between April 2014 and June 2015. Height and weight were measured and BMI calculated. Related risk factors including dietary habits, activity, parent’s education, sleeping pattern, and smoking were recorded. Result: A total of 14 schools included 424 students. 24.5% were either overweight or obese. The mean age was 15.44 year, 74.8% of the students were male, 53.8% were high school students, and 83.7% attended public schools. The mean overall GPA was 82.44% and the mean GPA for science subjects was 70.91%. No statically significant difference in the BMI was found between those who achieved >90% of the overall grade compared with those who achieved 90% overall grade are more likely to attend private school (p<0.05, live with their parents (p=0.013, having educated parents (p=0.037, getting optimal sleep (p<0.05, and they rarely eat their food outside their home (p<0.05. Conclusion: There was no correlation between the BMI and school performance, except in physics results where obese students perform worse than normal-weight students.

  13. How safe is defect specific maintenance of steam generator tubes?

    International Nuclear Information System (INIS)

    Dvorsek, T.; Cizelj, L.

    1995-01-01

    Outside diameter stress corrosion cracking at the tube to tube support plate intersections is assessed in the paper. The impact of defect specific maintenance on steam generator operation safety and reliability was investigated. This was performed by comparing efficiencies of defect specific and traditional maintenance strategy. The efficiency was studied through expected primary-to-secondary leak rate and tube rupture probability in a case of postulated accidental operating conditions, and number of tubes which shall be plugged using both maintenance strategies. In general, the efficiency of specific maintenance is function of particular steam generator and operating cycle. (author)

  14. Exploring the Knowledge Management Index as a Performance Diagnostic Tool

    Directory of Open Access Journals (Sweden)

    Jakov Crnkovic

    2005-04-01

    Full Text Available The knowledge management index (KMI has been proposed as a parsimonious and useful tool to help organizations gauge their knowledge management (KM capabilities. This may be the first step in understanding the difference between what an organization is currently doing and what it needs to do in order to maintain and improve its performance level. At the macro level, the index enables organizations to compare themselves with each other. At the micro level, it calls attention to areas needing improvement in current and future KM initiatives. In either case, the KMI provides a robust indicator and basis for business decision-making and organizational support and development. This paper presents a holistic approach to KM that relates key knowledge management processes (KMP and critical success factors (CSF needed to successfully implement it. By juxtaposing these processes and success factors, we create Belardo's matrix that will enable us to characterize an organization and estimate the KMI. At the macro level, we used realized KMI values and OP estimates to confirm the positive correlation between the KMI and OP. Additional findings include comparing the current and expected role of KM in organizations and discussion for marginal values of rows (CSF and columns (KM Processes of the proposed matrix.

  15. Self-Esteem Maintenance in Family Dynamics.

    Science.gov (United States)

    Tesser, Abraham

    1980-01-01

    In this study, a self-esteem maintenance model is introduced and is used to test predictions about sibling identification, sibling friction, and the closeness of father-son relationships as they relate to sibling performance. (Author/SS)

  16. Maintenance Management Systems in the Czech Enterprises of Chemical and Food Industries

    Directory of Open Access Journals (Sweden)

    Lenka Branska

    2016-12-01

    Full Text Available Purpose of the article: The aim of this article is to use the results of the qualitative research to describe the current form of maintenance systems used in enterprises of chemical and food industries, and then to discuss and generalize the results. Methodology/methods: The primary qualitative research was conducted in five companies, which can be regarded as typical representatives of the industries. The main objective of the primary research in individual companies was to determine how they perform the strategic and tactical operational planning of maintenance, implementation of these plans and their control. Individual interviews with respondents were used as the research method. The results of the research were processed using the content analysis method. Subsequently, comparison of the findings from individual businesses and subsequent synthesis thereof was performed, which allowed making generalizations. Scientific aim: The scientific aim of the article is to develop knowledge in the field of maintenance management by specifying the form of the maintenance systems utilized in Czech enterprises of the chemical and food industries and identifying the main opportunities for their improvement. Findings: Czech enterprises of the chemical and food industries utilize maintenance management systems. These systems are aimed at prevention, emphasizing the planning of maintenance activities in fixed periodic intervals. Also, they often utilize diagnostic maintenance. However, the maintenance systems currently used cannot be considered fully operational, with regard to the relatively large volume of after-failure repairs. Conclusions: Production equipment maintenance systems are irreplaceable in chemical and food industry enterprises, but there is great potential for improvement. Improvement should be focused on the area of strategic as well as tactical and operational planning of production equipment maintenance. In terms of strategy, the biggest

  17. Maintenance training - a modern necessity

    International Nuclear Information System (INIS)

    Bushall, W.

    1987-01-01

    In recent years, there has been an increase in technically advanced systems and equipment and a need for highly skilled and knowledgeable maintenance technicians to maintain them. To implement an effective training program, training groups' and plant staffs' key to success must be cooperation and creativity. This paper deals with plant staff interface and how to effectively conduct performance-based training while holding the line on costs. This paper includes cost effective and innovative measures to produce performance-based training for maintenance disciplines including: Using the plants staff as a resource as subject matter experts in the development and verification of training materials. Using the plant staff as a resource for the construction of training aids. Using salvage and surplus to produce high quality, low cost training aids. Using cutaways for better understanding of he theory of equipment operation. These cost saving practices are currently being used at Gulf States Utilities' River Bend Nuclear Station

  18. Performance test of diamond-like carbon films for lubricating ITER blanket maintenance equipment under GPa-level high contact stress

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2007-01-01

    Diamond-like carbon (DLC) coating was tested as a candidate solid lubricant for transmission gears of the maintenance equipment of the blanket of the ITER instead of an oil lubricant. The wear tests using the pin-on-disk method were performed on disks with SCM440 and SNCM420 as the base materials and coated with soft, layered, and hard DLCs. All cases satisfied the required allowable contact stress (2 GPa) and lifetime (10 4 cycles), and therefore the feasibility of the DLC coating was validated. Among the three types of DLCs, the soft DLC showed the best performance. (author)

  19. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  20. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  1. Study on Maintenance Practices for School Buildings in Terengganu and Kedah, Malaysia

    Directory of Open Access Journals (Sweden)

    Mohammad Ropi R.

    2014-03-01

    Full Text Available Malaysia initiated talks on building maintenance in 1971 during the Second Malaysia Plan of 1971-1975. Later, the government introduced the Building and Common Property (Maintenance and Management Act, 2007 to provide proper maintenance and management of buildings. School buildings are one of the important facilities for basic knowledge in everyday life. Accordingly, the maintenance of school buildings, which serve staff and students, needs considerable attention as effective maintenance protects capital investment, ensures the health and safety of the children, and supports educational performance. Based on a combination of literature survey and questionnaire appraisal, this study evaluates the maintenance practices in designated schools in Malaysia. Overall, the study showed that most of the school buildings do not possess their own maintenance management practices. Moreover, no preventive or planned maintenance was observed, and only emergency maintenance was applied when necessary. The study recommends the implementation of planned maintenance practices, which will be more effective than unplanned maintenance, mostly because of the reduction in repair costs.

  2. The ITER EC H and CD Upper Launcher: Maintenance concepts

    International Nuclear Information System (INIS)

    Ronden, D.M.S.; Baar, M. de; Chavan, R.; Elzendoorn, B.S.Q.; Grossetti, G.; Heemskerk, C.J.M.; Koning, J.F.; Landis, J.-D.; Spaeh, P.; Strauss, D.

    2013-01-01

    Highlights: ► We explain how an overall maintenance strategy defines individual maintenance tasks. ► Concepts are presented for replacement strategies of the in-vessel optical components. ► Vertical placement of the Upper Launcher in the Hot Cell may simplify maintenance. -- Abstract: Maintenance of the ITER EC H and CD Upper Launcher (UL) shall be performed through the use of Remote Handling (RH) in the ITER Hot Cell Facility (HCF). The UL design will have to be fully compliant with ITER RH maintenance requirements and the set of RH tooling and services available in the HCF. This paper describes the development of an overall maintenance strategy for the UL, starting from a listing of all conceivable maintenance operations, including hands-on tasks. Components for which design concepts are discussed in this paper are the Blanket Shield Module (BSM), the steering mirror (M4), the mid optics (M1, M2) and the waveguide (WG) feed-through plate. Aspects related to RH documentation, overall maintenance strategy and design concepts for optimizing the maintainability of the UL are presented

  3. Maintenance self-assessments - An INPO [Institute of Nuclear Power Operation] perspective

    International Nuclear Information System (INIS)

    Subalusky, W.T.

    1990-01-01

    In March 1987, all nuclear utilities in the US were requested by the Institute of Nuclear Power Operations (INPO) to perform a self-assessment of their maintenance programs. The goal of these self-assessments was to have each station identify any existing problem areas in maintenance in clear and sufficient detail to determine the root causes of the problems and to provide a foundation for subsequent corrective actions. The self-assessments were to be performed by each nuclear station using the INPO document Guidelines for the Conduct of Maintenance at Nuclear Power Stations. By December 1987, 72 of 74 stations had completed the self-assessments, and by the middle of 1988, all stations had completed this systematic review of their maintenance programs. As part of an industry plan to ensure continued improvements in maintenance, INPO is following up on the effectiveness of these self-assessments during the course of plant evaluation visits. This presentation briefly reviews the approaches to self-assessment of the station's maintenance programs, some of the lessons learned from this effort, and the results, to date, of INPO follow-up efforts in this area

  4. Forecasting performance of smooth transition autoregressive (STAR model on travel and leisure stock index

    Directory of Open Access Journals (Sweden)

    Usman M. Umer

    2018-06-01

    Full Text Available Travel and leisure recorded a consecutive robust growth and become among the fastest economic sectors in the world. Various forecasting models are proposed by researchers that serve as an early recommendation for investors and policy makers. Numerous studies proposed distinct forecasting models to predict the dynamics of this sector and provide early recommendation for investors and policy makers. In this paper, we compare the performance of smooth transition autoregressive (STAR and linear autoregressive (AR models using monthly returns of Turkey and FTSE travel and leisure index from April 1997 to August 2016. MSCI world index used as a proxy of the overall market. The result shows that nonlinear LSTAR model cannot improve the out-of-sample forecast of linear AR model. This finding demonstrates little to be gained from using LSTAR model in the prediction of travel and leisure stock index. Keywords: Nonlinear time-series, Out-of-sample forecasting, Smooth transition autoregressive, Travel and leisure

  5. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  6. Dynamic modeling and simulation of power transformer maintenance costs

    Directory of Open Access Journals (Sweden)

    Ristić Olga

    2016-01-01

    Full Text Available The paper presents the dynamic model of maintenance costs of the power transformer functional components. Reliability is modeled combining the exponential and Weibull's distribution. The simulation was performed with the aim of corrective maintenance and installation of the continuous monitoring system of the most critical components. Simulation Dynamic System (SDS method and VENSIM PLE software was used to simulate the cost. In this way, significant savings in maintenance costs will be achieved with a small initial investment. [Projekat Ministarstva nauke Republike Srbije, br. III 41025 i br. OI 171007

  7. Overweight and Cognitive Performance: High Body Mass Index Is Associated with Impairment in Reactive Control during Task Switching

    Directory of Open Access Journals (Sweden)

    Laura Steenbergen

    2017-10-01

    Full Text Available The prevalence of weight problems is increasing worldwide. There is growing evidence that high body mass index (BMI is associated with frontal lobe dysfunction and deficits in cognitive control. The present study aims to clarify the association between weight status and the degree of impairment in cognitive flexibility, i.e., the ability to efficiently switch from one task to another, by disentangling the preparatory and residual domains of task switching. Twenty-six normal weight (BMI < 25, five males and twenty-six overweight (BMI ≥ 25, seven males university students performed a task-switching paradigm that provides a relatively well-established diagnostic measure of proactive vs. reactive control with regard to cognitive flexibility. Compared to individuals with a BMI lower than 25, overweight (i.e., ≥25 was associated with increased switching costs in the reactive switching condition (i.e., when preparation time is short, representing reduced cognitive flexibility in the preparatory domain. In addition, the overweight group reported significantly more depression and binge eating symptoms, although still indicating minimal depression. No between-group differences were found with regard to self-reported autism spectrum symptoms, impulsiveness, state- and trait anxiety, and cognitive reactivity to depression. The present findings are consistent with and extend previous literature showing that elevated BMI in young, otherwise healthy individuals is associated with significantly more switching costs due to inefficiency in the retrieval, implementation, and maintenance of task sets, indicating less efficient cognitive control functioning.

  8. Electroconvulsive therapy in the continuation and maintenance treatment of depression: Systematic review and meta-analyses.

    Science.gov (United States)

    Elias, Alby; Phutane, Vivek H; Clarke, Sandy; Prudic, Joan

    2018-05-01

    Acute course of electroconvulsive therapy is effective in inducing remission from depression, but recurrence rate is unacceptably high following termination of electroconvulsive therapy despite continued pharmacotherapy. Continuation electroconvulsive therapy and maintenance electroconvulsive therapy have been studied for their efficacy in preventing relapse and recurrence of depression. The purpose of this meta-analysis was to examine the efficacy of continuation electroconvulsive therapy and maintenance electroconvulsive therapy in preventing relapse and recurrence of depression in comparison to antidepressant pharmacotherapy alone. We searched MEDLINE, Embase, PsycINFO, clinicaltrials.gov and Cochrane register of controlled trials from the database inception to December 2016 without restriction on language or publication status for randomized trials of continuation electroconvulsive therapy and maintenance electroconvulsive therapy. Two independent Cochrane reviewers extracted the data in accordance with Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines for systematic reviews and meta-analyses. The risk of bias was assessed using four domains of the Cochrane Collaboration Risk of Bias Tool. Outcomes were pooled using random effect model. The primary outcome was relapse or recurrence of depression. Five studies involving 436 patients were included in the meta-analysis. Analysis of the pooled data showed that continuation electroconvulsive therapy and maintenance electroconvulsive therapy, both with pharmacotherapy, were associated with significantly fewer relapses and recurrences than pharmacotherapy alone at 6 months and 1 year after a successful acute course of electroconvulsive therapy (risk ratio = 0.64, 95% confidence interval = [0.41, 0.98], p = 0.04, risk ratio = 0.46, 95% confidence interval = [0.21, 0.98], p = 0.05, respectively). There was insufficient data to perform a meta-analysis of stand

  9. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  10. On-line maintenance PSA support at NPP Krsko

    International Nuclear Information System (INIS)

    Prosen, R.; Vrbanic, I.; Kastelan, M.

    2000-01-01

    In 1997 Krsko NPP initiated the on-line maintenance (OLM) practice. On-line maintenance constitutes of corrective activities, preventive activities, surveillance activities, tests and inspections, as well as calibrations and modifications, taking place during the normal power operations. The on-line maintenance is a multidisciplinary process consisting of activity specification, planning, and preparation and performing of the OLM activity of interest. The primary role of the PSA group is to assess from the r isk perspective , using the plant-specific NEK PSA model, system unavailability and the impact to the plant operational risk. The intent is to support planning of the on-line maintenance activities from the risk perspective. The risk evaluation of the OLM activities is based on the probability of core damage evaluation for the defined discrete plant configuration states, determined by the OLM activities. Within this application, the optimized, plant-specific PSA model is used on Risk Spectrum platform. To perform the risk assessment of the on-line maintenance activities, first the systems to be affected are defined based on the planned OLM activities. The next important step is the assessment of the planned work schedule. To define the final schedule, the co-ordination and optimizing the planned OLM activities needs activation of all participating departments, supported also from PSA group. The P3 (i.e. Primavera) planning tool system windows are defined for different systems and groups of systems, and the activities are sorted in particular weeks according to these windows. (author)

  11. A remote maintenance robot system for a pulsed nuclear reactor

    International Nuclear Information System (INIS)

    Thunborg, S.

    1987-01-01

    This paper presents a remote maintenance robot system for use in a hazardous environment. The system consists of turntable, robot and hoist subsystems which operate under the control of a supervisory computer to perform coordinated programmed maintenance operations on a pulsed nuclear reactor. The system is operational

  12. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  13. Maintenance of the packagings used for the transport of spent fuel

    International Nuclear Information System (INIS)

    Lazarevitch, S.; Cooke, B.

    1987-01-01

    Regular maintenance of packagings used for the transport of spent fuel has been carried out in Europe for the past three years. The three companies involved in this kind of transport (Cogema, Nuclear Transport and Pacific Nuclear Transport) have agreed on a common policy for these operations and, in practice, perform the maintenance work at a special facility (AMEC) at the La Hague reprocessing plant in France. This facility was erected in 1983, and commissioned in January 1984. The paper deals with the typical maintenance operations at the AMEC facility, the principles of control applied during maintenance, maintenance experience and future development and prospects. (author)

  14. THE EFFECT OF INTELLECTUAL CAPITAL AND ISLAMICITY PERFORMANCE INDEX TO THE PERFORMANCE OF ISLAMIC BANK IN INDONESIA 2010-2014 PERIODS

    Directory of Open Access Journals (Sweden)

    Pandu Dewanata

    2016-09-01

    Full Text Available The purpose of this research is to know the influence of intellectual capital and islamicity performance index by proxy is profit-sharing ratio, zakat performance ratio, and equitable distribution ratio on performance of Islamic bank in Indonesia in the period 2010-2014. The data used in this research is financial statement of 11 Islamic bank in Indonesia 2010-2014 periods. Regression model using panel data with Fixed Effect Model. The result of this research is intellectual capital and zakat performance ratio has significant and positif impact on ROA, while equitable distribution ratio has not significant impact on ROA, and profit sharing ratio has significant and positif impact on ROA.

  15. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  16. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  17. Applying principles of Design For Assembly to ITER maintenance operations

    International Nuclear Information System (INIS)

    Heemskerk, Cock; de Baar, Marco; Elzendoorn, Ben; Koning, Jarich; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedback, a two-armed master slave manipulator system can mimic direct access with dexterous manipulation, tactile feedback and vision. But even then, turnaround times are still very high. Adapting the design for simplified maintenance operations can yield significant time savings. One of the methods known to produce a simpler, more robust design, which is also better suited for handling with robots, is Design For Assembly (DFA). This paper discusses whether and how the principles of DFA can be applied to simplify maintenance operations for ITER. While DFA is normally used with series-production and ITER is a unique product, it is possible to apply the principles of DFA to ITER maintenance operations. Furthermore, DFA's principles can be applied at different abstraction levels. Combining principles of DFA with Virtual Reality leads to new insights and provides additional value.

  18. Predictive maintenance policy for a gradually deteriorating system subject to stress

    Energy Technology Data Exchange (ETDEWEB)

    Deloux, E. [IRCCyN/Ecole des Mines de Nantes, Nantes (France); Castanier, B. [IRCCyN/Ecole des Mines de Nantes, Nantes (France)], E-mail: bruno.castanier@emn.fr; Berenguer, C. [Universite de Technologie de Troyes/CNRS, Troyes (France)

    2009-02-15

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters.

  19. Building Maintenance Management in a Malaysian University Campus: A Case Study

    Directory of Open Access Journals (Sweden)

    Olanrewaju Abdul Lateef

    2010-07-01

    Full Text Available University buildings require maintenance in order to create a conducive environment that supports and stimulates learning, teaching, innovation, and research. The prime objective of maintenance is to ensure, as far as practicable, the continued peak performance of the building throughout its design life. This paper seeks to report the maintenance management system of a university institution in Malaysia. Primary data was gathered through the analysis of a case study. The objectives of the case study are to identify, describe and assess the maintenance management system used by the university. The major conclusion drawn from the case study was that although university building maintenance practices are corrective and cyclical there is a lack of a comprehensive maintenance management framework that guides the decision-making processes. The case study also revealed irregularities in the university’s maintenance management system.

  20. Predictive maintenance policy for a gradually deteriorating system subject to stress

    International Nuclear Information System (INIS)

    Deloux, E.; Castanier, B.; Berenguer, C.

    2009-01-01

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters

  1. Field maintenance of radiation-shielding windows at HFEF

    International Nuclear Information System (INIS)

    Tobias, D.A.

    1983-01-01

    The achievement of excellent viewing through hot-cell shielding windows does not occur by chance. Instead, it requires a well planned and executed program of field maintenance. The lack of such a program is a major factor when a hot-cell facility has poor window viewing. At HFEF, all preventive maintenance is performed by one group of trained technical-support personnel under the immediate direction of a Systems Engineer, who has responsibility for the shielding windows. Window maintenance is prescheduled and recorded by being incorporated into the computerized Maintenance Data System (MDS). Measurements of window light transmission are scheduled annually to determine glass browning or oil cloudiness conditions within the window tank. The tank oil is sampled and chemically analyzed annually to determine the moisture content, the acidity, and the probable deterioration rate caused by irradiation

  2. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    OpenAIRE

    Paolo Renna

    2017-01-01

    Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performa...

  3. Improving iris recognition performance using segmentation, quality enhancement, match score fusion, and indexing.

    Science.gov (United States)

    Vatsa, Mayank; Singh, Richa; Noore, Afzel

    2008-08-01

    This paper proposes algorithms for iris segmentation, quality enhancement, match score fusion, and indexing to improve both the accuracy and the speed of iris recognition. A curve evolution approach is proposed to effectively segment a nonideal iris image using the modified Mumford-Shah functional. Different enhancement algorithms are concurrently applied on the segmented iris image to produce multiple enhanced versions of the iris image. A support-vector-machine-based learning algorithm selects locally enhanced regions from each globally enhanced image and combines these good-quality regions to create a single high-quality iris image. Two distinct features are extracted from the high-quality iris image. The global textural feature is extracted using the 1-D log polar Gabor transform, and the local topological feature is extracted using Euler numbers. An intelligent fusion algorithm combines the textural and topological matching scores to further improve the iris recognition performance and reduce the false rejection rate, whereas an indexing algorithm enables fast and accurate iris identification. The verification and identification performance of the proposed algorithms is validated and compared with other algorithms using the CASIA Version 3, ICE 2005, and UBIRIS iris databases.

  4. Conceptual design and assessment of in-service inspection and maintenance of KALIMER

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Kim, Jong Bum; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-05-01

    In the conceptual design stage of KALIMER, the philosophy and methodology of in-service inspection (ISI) and maintenance for the reactor system and components are proposed and described. The ISI and maintenance should be carried out throughout plant life to ensure the structural integrity and safety of KALIMER. The conceptual design of ISI and maintenance are performed for considering the design characteristics of KALIMER and the intents of the ASME XI Division 3. This report describes and summarizes the requirements and available methods of ISI and maintenance. The visual inspection and continuous monitoring play a great role in the in-service inspection of KALIMER. The major structures of KALIMER reactor system are designed for maintenance free operation for the plant life time and the maintenance philosophy is to replace major components rather than repair them. The assessment of the ISI accessibility and maintainability is performed and reviewed each major component. The postulated failure defects for each component are estimated and evaluated for KALIMER safety and reliability. 8 refs., 16 figs., 13 tabs. (Author)

  5. High Performance Graded Index Polymer Optical Fibers

    National Research Council Canada - National Science Library

    Garito, Anthony

    1998-01-01

    ...) plastic optical fibers (POF) and graded index (GI) POFs are reported. A set of criteria and analyses of physical parameters are developed in context to the major issues of POF applications in short-distance communication systems...

  6. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  7. Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions

    International Nuclear Information System (INIS)

    You Mingyi; Li Hongguang; Meng Guang

    2011-01-01

    This paper develops two component-level control-limit preventive maintenance (PM) policies for systems subject to the joint effect of partial recovery PM acts (imperfect PM acts) and variable operational conditions, and investigates the properties of the proposed policies. The extended proportional hazards model (EPHM) is used to model the system failure likelihood influenced by both factors. Several numerical experiments are conducted for policy property analysis, using real lifetime and operational condition data and typical characterization of imperfect PM acts and maintenance durations. The experimental results demonstrate the necessity of considering both factors when they do exist, characterize the joint effect of the two factors on the performance of an optimized PM policy, and explore the influence of the loading sequence of time-varying operational conditions on the performance of an optimized PM policy. The proposed policies extend the applicability of PM optimization techniques.

  8. [Carbohydrates and mental performance--the role of glycemic index of food products].

    Science.gov (United States)

    Ciok, Janusz; Dolna, Agnieszka

    2006-03-01

    The role of carbohydrates in proper functioning of central nervous system measured by parameters of cognitive performance was described. The only source of energy for the brain is glucose, which stimulates the production and secretion of acetylocholine. Important are also enough high blood level of insulin and the level of insulin growth factor (IGF). Many studies had showed that breakfast intake improves the ability of concentration, reaction time, learning ability, mood and memory. Not sufficient amount of nutritional carbohydrates may in opposite be negative for the results of some tests measuring cognitive performance. The results of studies showing that the disturbances in utilization of carbohydrates, present in the patients with diabetes, increase the risk of abnormalities of cognitive performance. There is some evidence that the kind of ingested carbohydrates is important. Several studies suggest that the intake of carbohydrates characterized by low glycemic index (GI) may be favorable for some parameters of cognitive performance, because of prolonged time of stable glicaemia after food ingestion.

  9. A process for risk-focused maintenance

    International Nuclear Information System (INIS)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B.

    1991-03-01

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab

  10. A process for risk-focused maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B. (Science Applications International Corp., McLean, VA (USA))

    1991-03-01

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab.

  11. Transportation cask decontamination and maintenance at the potential Yucca Mountain repository

    International Nuclear Information System (INIS)

    Hartman, D.J.; Miller, D.D.; Hill, R.R.

    1992-04-01

    This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described

  12. Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the NTS

    Energy Technology Data Exchange (ETDEWEB)

    Vefa Yucel

    2007-01-03

    U.S. Department of Energy (DOE) Manual M 435.1-1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). This plan supersedes the Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (DOE/NV/11718--491-REV 1, dated September 2002). The plan is based on U.S. Department of Energy (DOE) Order 435.1 (DOE, 1999a), DOE Manual M 435.1-1 (DOE, 1999b), the DOE M 435.1-1 Implementation Guide DOE G 435.1-1 (DOE, 1999c), and the Maintenance Guide for PAs and CAs (DOE, 1999d). The plan includes a current update on PA/CA documentation, a revised schedule, and a section on Quality Assurance.

  13. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  14. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  15. Improving the performance of temperature index snowmelt model of SWAT by using MODIS land surface temperature data.

    Science.gov (United States)

    Yang, Yan; Onishi, Takeo; Hiramatsu, Ken

    2014-01-01

    Simulation results of the widely used temperature index snowmelt model are greatly influenced by input air temperature data. Spatially sparse air temperature data remain the main factor inducing uncertainties and errors in that model, which limits its applications. Thus, to solve this problem, we created new air temperature data using linear regression relationships that can be formulated based on MODIS land surface temperature data. The Soil Water Assessment Tool model, which includes an improved temperature index snowmelt module, was chosen to test the newly created data. By evaluating simulation performance for daily snowmelt in three test basins of the Amur River, performance of the newly created data was assessed. The coefficient of determination (R (2)) and Nash-Sutcliffe efficiency (NSE) were used for evaluation. The results indicate that MODIS land surface temperature data can be used as a new source for air temperature data creation. This will improve snow simulation using the temperature index model in an area with sparse air temperature observations.

  16. Optimization of maintenance policy using the proportional hazard model

    Energy Technology Data Exchange (ETDEWEB)

    Samrout, M. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: mohamad.el_samrout@utt.fr; Chatelet, E. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: chatelt@utt.fr; Kouta, R. [M3M Laboratory, University of Technology of Belfort Montbeliard (France); Chebbo, N. [Industrial Systems Laboratory, IUT, Lebanese University (Lebanon)

    2009-01-15

    The evolution of system reliability depends on its structure as well as on the evolution of its components reliability. The latter is a function of component age during a system's operating life. Component aging is strongly affected by maintenance activities performed on the system. In this work, we consider two categories of maintenance activities: corrective maintenance (CM) and preventive maintenance (PM). Maintenance actions are characterized by their ability to reduce this age. PM consists of actions applied on components while they are operating, whereas CM actions occur when the component breaks down. In this paper, we expound a new method to integrate the effect of CM while planning for the PM policy. The proportional hazard function was used as a modeling tool for that purpose. Interesting results were obtained when comparison between policies that take into consideration the CM effect and those that do not is established.

  17. A study of data representation in Hadoop to optimize data storage and search performance for the ATLAS EventIndex

    Science.gov (United States)

    Baranowski, Z.; Canali, L.; Toebbicke, R.; Hrivnac, J.; Barberis, D.

    2017-10-01

    This paper reports on the activities aimed at improving the architecture and performance of the ATLAS EventIndex implementation in Hadoop. The EventIndex contains tens of billions of event records, each of which consists of ∼100 bytes, all having the same probability to be searched or counted. Data formats represent one important area for optimizing the performance and storage footprint of applications based on Hadoop. This work reports on the production usage and on tests using several data formats including Map Files, Apache Parquet, Avro, and various compression algorithms. The query engine plays also a critical role in the architecture. We report also on the use of HBase for the EventIndex, focussing on the optimizations performed in production and on the scalability tests. Additional engines that have been tested include Cloudera Impala, in particular for its SQL interface, and the optimizations for data warehouse workloads and reports.

  18. A study of data representation in Hadoop to optimise data storage and search performance for the ATLAS EventIndex

    CERN Document Server

    AUTHOR|(CDS)2078799; The ATLAS collaboration; Canali, Luca; Toebbicke, Rainer; Hrivnac, Julius; Barberis, Dario

    2017-01-01

    This paper reports on the activities aimed at improving the architecture and performance of the ATLAS EventIndex implementation in Hadoop. The EventIndex contains tens of billions of event records, each of which consists of ∼100 bytes, all having the same probability to be searched or counted. Data formats represent one important area for optimizing the performance and storage footprint of applications based on Hadoop. This work reports on the production usage and on tests using several data formats including Map Files, Apache Parquet, Avro, and various compression algorithms. The query engine plays also a critical role in the architecture. We report also on the use of HBase for the EventIndex, focussing on the optimizations performed in production and on the scalability tests. Additional engines that have been tested include Cloudera Impala, in particular for its SQL interface, and the optimizations for data warehouse workloads and reports.

  19. A study of data representations in Hadoop to optimize data storage and search performance of the ATLAS EventIndex

    CERN Document Server

    Baranowski, Zbigniew; The ATLAS collaboration

    2016-01-01

    This paper reports on the activities aimed at improving the architecture and performance of the ATLAS EventIndex implementation in Hadoop. The EventIndex contains tens of billions event records, each of which consisting of ~100 bytes, all having the same probability to be searched or counted. Data formats represent one important area for optimizing the performance and storage footprint of applications based on Hadoop. This work reports on the production usage and on tests using several data formats including Map Files, Apache Parquet, Avro, and various compression algorithms. The query engine plays also a critical role in the architecture. This paper reports on the use of HBase for the EventIndex, focussing on the optimizations performed in production and on the scalability tests. Additional engines that have been tested include Cloudera Impala, in particular for its SQL interface, and the optimizations for data warehouse workloads and reports.

  20. Plant Maintenance. The Licensee's Viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Ungi, T. [Heysham 2 Power Station, Nuclear Electric LTD (United Kingdom)

    1997-07-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)