WorldWideScience

Sample records for parking management plan

  1. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  2. Strategic and tactiocal planning for managing national park resources

    Science.gov (United States)

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  3. Kaloko-Honokohau National Historical Park Air Tour Management Plan planning and NEPA scoping document

    Science.gov (United States)

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kaloko-Honokohau Historic Park pursuant to the National Parks Air Tour Management ...

  4. Kalaupapa National Historic Park Air Tour Management Plan planning and NEPA scoping study

    Science.gov (United States)

    2005-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kalaupapa Historic Park pursuant to the National Parks Air Tour Management Act of ...

  5. Hawaii Volcanoes National Park Air Tour Management Plan: Planning and NEPA Scoping Document

    Science.gov (United States)

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of Air Tour Management Plans (ATMPs) for Haleakala National Park, Hawaii Volcanoes National Park, Puukohola Heiau National H...

  6. 76 FR 44604 - Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact...

    Science.gov (United States)

    2011-07-26

    ... Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact Statement AGENCY... availability of the Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact... resident Canada geese. Action is needed at this time to manage the restored wetlands at the Park. The Plan...

  7. 75 FR 28055 - General Management Plan; Joshua Tree National Park; San Bernardino and Riverside Counties, CA...

    Science.gov (United States)

    2010-05-19

    ... kinds of resource management activities, visitor activities, and developments that would be appropriate... DEPARTMENT OF THE INTERIOR National Park Service General Management Plan; Joshua Tree National... National Park Service is updating the General Management Plan (GMP) for Joshua Tree National Park...

  8. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Science.gov (United States)

    2013-02-26

    ... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS....YP0000] Draft Environmental Impact Statement for General Management Plan, Everglades National Park... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National...

  9. 77 FR 1720 - Final Environmental Impact Statement for the White-Tailed Deer Management Plan, Rock Creek Park

    Science.gov (United States)

    2012-01-11

    ... Environmental Impact Statement for the White-Tailed Deer Management Plan, Rock Creek Park AGENCY: National Park...), Rock Creek Park, Washington, DC The Plan will support long-term protection, preservation, and restoration of native vegetation and other natural and cultural resources in Rock Creek Park. DATES: The NPS...

  10. Metropolis Parking Problems and Management Planning Solutions for Traffic Operation Effectiveness

    Directory of Open Access Journals (Sweden)

    Yuejun Liu

    2012-01-01

    Full Text Available Advances in mobility are clearly illustrated by the rapid development of urbanization and motorization in developing countries. Following the dramatic incensement of traffic demand, the parking problem has been becoming much more seriously important in many metropolises. With the aim of seeking solutions as to how the parking system could operate more efficiently by using new technologies and new methodologies, this paper discusses the application of geographic information system into the parking planning and management for traffic operation effectiveness in metropolis. The concentration of this paper includes the characteristics of parking demand and the causations of parking problems, especially the basic parking principle and strategies for solving parking problems from the perspective of geographic information system are discussed in enough detail in this paper.

  11. Study on environmental friendly national park management plan: concentrated on the support plan for national park residents

    Energy Technology Data Exchange (ETDEWEB)

    Park, Yong Ha; Byun, Byoung Seol; Chung, Hoe Seong; Kim, Mi Sook; Kim, Jeong Won; Joo, Yong Joon [Korea Environment Institute, Seoul (Korea)

    1999-12-01

    National parks in Korea have been selected for preserving beautiful sceneries of nature or diversity of organisms. Today as the increase of population and industrialization has caused the increase of natural resource demand, it is difficult to preserve all ecosystems equally. Therefore the national park system has established to prevent the damage to an ecosystem or to preserve a region that can be damaged by selecting a valuable area. The objective of this study is to recommend an efficient support plan for national park residents, to induce their activities to be environmental friendly and to preserve an ecosystem in a national park. To achieve this, the similar systems, laws and cases in the advanced countries have compared and reviewed and a support plan for residents appropriate for Korean situation has discussed. 41 refs., 4 figs., 33 tabs.

  12. Planning for integrated solid waste management at the industrial Park level: A case of Tianjin, China

    International Nuclear Information System (INIS)

    Geng Yong; Zhu Qinghua; Haight, Murray

    2007-01-01

    Industrial parks play a significant role in the production and use of goods and services. The proper management of solid waste is a major challenge for industrial parks due to the large quantity of wastes and the variability of waste characteristics from these types of developments. Therefore, integrated solid waste management has become very crucial to the industrial park managers. Such an approach requires industrial park managers to assess the overall use of resources, and to seek waste reduction, reuse and recycling opportunities both at the individual company level and among different tenant companies. The adoption of this method can bring both economic and environmental benefits. This paper introduces the planning efforts of a real case in China. It first presents the basic information on Tianjin Economic Development Area (TEDA), and then introduces its current practices on solid waste management. The main focus of this paper is to describe how to plan an integrated solid waste management system at TEDA. Benefits and challenges are all identified and analyzed. The experiences and methods from this case study should be applied in other industrial parks so as to improve the overall eco-efficiency of the whole industrial park

  13. Remote sensing: a tool for park planning and management

    Science.gov (United States)

    Draeger, William C.; Pettinger, Lawrence R.

    1981-01-01

    Remote sensing may be defined as the science of imaging or measuring objects from a distance. More commonly, however, the term is used in reference to the acquisition and use of photographs, photo-like images, and other data acquired from aircraft and satellites. Thus, remote sensing includes the use of such diverse materials as photographs taken by hand from a light aircraft, conventional aerial photographs obtained with a precision mapping camera, satellite images acquired with sophisticated scanning devices, radar images, and magnetic and gravimetric data that may not even be in image form. Remotely sensed images may be color or black and white, can vary in scale from those that cover only a few hectares of the earth's surface to those that cover tens of thousands of square kilometers, and they may be interpreted visually or with the assistance of computer systems. This article attempts to describe several of the commonly available types of remotely sensed data, to discuss approaches to data analysis, and to demonstrate (with image examples) typical applications that might interest managers of parks and natural areas.

  14. 78 FR 13376 - Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park

    Science.gov (United States)

    2013-02-27

    ... and experience from management actions; and minimize the potential for health and safety issues for...] Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park AGENCY... National Environmental Policy Act of 1969 and the Council on Environmental Quality regulations, the...

  15. Wilderness management planning in an Alaskan national park: last chance to do it right?

    Science.gov (United States)

    Michael J. Tranel

    2000-01-01

    Like many wilderness areas, Denali National Park and Preserve faces a variety of challenges in its wilderness management planning. As an Alaska conservation unit that has been significantly expanded by the Alaska National Interest Lands Conservation Act of 1980 (ANILCA), Denali faces the additional responsibility of acknowledging that its management of controversial...

  16. Two approaches for incorporating climate change into natural resource management planning at Wind Cave National Park

    Science.gov (United States)

    Symstad, Amy J.; Long, Andrew J.; Stamm, John; King, David A.; Bachelet, Dominque M.; Norton, Parker A.

    2014-01-01

    Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches. Wind Cave National Park (WICA) protects one of the world’s longest caves

  17. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  18. 77 FR 37438 - Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park...

    Science.gov (United States)

    2012-06-21

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-MWR-CUVA-10100; 6065-4000-409] Draft Trail... Park Service, Interior. ACTION: Notice of Availability. SUMMARY: The National Park Service (NPS... blueprint to guide the expansion, elimination, restoration, management, and use of the trail system and its...

  19. THE PROGRAM-TARGET PLANNING AND MANAGEMENT OF DEVELOPMENT OF MEASURING EQUIPMENT PARK

    Directory of Open Access Journals (Sweden)

    Marichev Pavel Aleksandrovich

    2018-02-01

    Full Text Available Subject: study of the Park of Measuring Equipment (PME that includes hundreds of thousands of standard samples, measuring instruments, control and measuring devices and other measuring mechanisms with different areas of application, levels of reliability, service life, levels of technical perfection and levels of technical condition. Research objectives: 1. Development of a complex of mathematical models to simulate the processes of development of PME, control indicators of PME performance as a whole, purposefully control the stages of life cycle of measuring equipment samples. 2. Development of the method which, with a sufficient degree of validity and objectivity, would solve the tasks of management of procurement and repairs both in preparation of proposals for preliminary long-term plan documents (LTPD and to ensure control over the implementation of adopted plans. Thus, the method being developed should be fairly simple to use, easily adjustable for solving problems of different dimensions, suitable for solving the optimal control problem for PME as a whole, for a part of PME, and also suitable for solving a generalized problem for certain “aggregated objects” such as the Metrology Centers. Materials and methods: the methods of mathematical simulation, methods of comparative analysis, simplex method for solving linear programming problem, methods of program-target planning were used. Results: an approach to the solution of problems of program-target planning based on solving a series of linear programming problems has been developed. The results have been presented of using the approach both for formulation of proposals into the preliminary LTPD and also for introducing revisions (amendments to annual plans, which are implemented in the framework of the state defense order. Conclusions: the described method and algorithms constitute an effective tool for solving practical problems of target-oriented management of PME performance

  20. Changing perspectives in urban park management

    DEFF Research Database (Denmark)

    Chan, Chung-shing; Marafa, Lawal M.; Konijnendijk, Cecil Cornelis

    2015-01-01

    managers in Hong Kong have encountered different challenges over time, and the quest for changing park managerial strategies. In 2004, a set of indicators for urban park management in Hong Kong was produced as part of a Master's research. Local park managers were asked about their views on the respective......Urban parks provide numerous benefits to our society. In densely populated metropolises such as Hong Kong, urban parks are in high demand. A variety of indicators can be used as tools for improving park planning and management. Facing a dynamic society and increasing user expectations, urban park...... importance and performance (I–P) of the indicators. In 2012, a follow-up questionnaire survey was conducted with the managers to study if their views regarding these indicators and their performance had changed. Results from the 2004 and 2012 surveys revealed changing perceptions regarding both I...

  1. An integrated management plan for the control of Opuntia stricta (Cactaceae in the Kruger National Park, South Africa

    Directory of Open Access Journals (Sweden)

    W.D. Lotter

    1998-01-01

    Full Text Available Opuntia stricta is the most problematic alien plant species in the Kruger National Park (KNP where 30000 ha around Skukuza have been invaded by the weed. Control of 0. stricta is expensive and time consuming and there are insufficient resources available for the task at present. Biological control using the moth Cactoblastis cactorum has only been partially successful and herbicidal control remains the main method for tackling the problem. In order to optimise the control operation against 0. stricta, a management plan has been developed for the KNP. The infested region of the park has been divided into 18 management units, each of which will be treated in turn. During the first three years the control operations will clear 0. stricta from the peripheral units, to prevent the spread of the weed into other areas of the KNP, after which the central units will be tackled. The objective is to destroy all mature fruiting plants and those nearing maturity to curb long-range (seed dispersal of the weed. The small juvenile plants, which are difficult to detect, will be suppressed by C. cactorum. After five years the problem should be contained to the extent that an ongoing 'holding' programme will be sufficient to keep the weed in check. The success of the plan will depend on increased resources being committed to alien plant control in the Kruger National Park.

  2. Keeping it wild in the National Park Service: A user guide to integrating wilderness character into park planning, management, and monitoring

    Science.gov (United States)

    Peter Landres; Suzy Stutzman; Wade Vagias; Carol Cook; Christina Mills; Tim Devine; Sandee Dingman; Adrienne Lindholm; Miki Stuebe; Melissa Memory; Ruth Scott; Michael Bilecki; Ray O' Neil; Chris Holbeck; Frank Turina; Michael Haynie; Sarah Craighead; Chip Jenkins; Jeremy Curtis; Karen Trevino

    2014-01-01

    This User Guide was developed to help National Park Service (NPS) staff effectively and efficiently fulfill the mandate from the 1964 Wilderness Act and NPS policy to "preserve wilderness character" now and into the future. This mandate applies to all congressionally designated wilderness and other park lands that are, by policy, managed as wilderness,...

  3. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Science.gov (United States)

    2012-07-02

    ... online at the NPS Planning, Environmental and Public Comment Web site at http://parkplanning.nps.gov/dena... served well as a way to manage vehicle use, while providing high quality visitor opportunities to see... framework for vehicle use based on indicators and standards for visitor experiences and resource protection...

  4. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Science.gov (United States)

    2011-03-29

    ... draft alternatives in the development of an Air Tour Management Plan (ATMP) for the Mount Rainier... Environmental Assessment (EA), an ATMP, and associated rulemaking actions which comply with the National...: http://parkplanning.nps.gov/MORA_ATMP or sent to the mailing addresses listed in the ``FOR FURTHER...

  5. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Science.gov (United States)

    2013-06-25

    ...[aacute]squez, at the Park Headquarters/Pine Springs Visitor Center: 400 Pine Canyon Drive, Salt Flat, TX...]squez, Superintendent, Guadalupe Mountains National Park, HC 60, Box 400, Salt Flat, TX 79847-9400.... Campsites and horse corrals would be closed and their sites revegetated. The limited amount of new...

  6. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Science.gov (United States)

    2013-04-24

    ... discuss the draft plan at their regular meetings. Park staff attended and presented at approximately six... pieces of correspondence were received, containing 889 comments, during the 90- day comment period. A...

  7. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  8. A social assessment of urban parkland: Analyzing park use and meaning to inform management and resilience planning

    Science.gov (United States)

    Lindsay K. Campbell; Erika S. Svendsen; Nancy Falxa Sonti; Michelle L. Johnson

    2016-01-01

    Globally, municipalities are tackling climate adaptation and resilience planning. Urban green space has crucial biophysical buffering capacities, but also affects social interactions and human well-being. This paper considers the social dimension of urban green space, through an assessment focused on park use, function, and meanings, and compares results to categories...

  9. Automated Car Park Management System

    Science.gov (United States)

    Fabros, J. P.; Tabañag, D.; Espra, A.; Gerasta, O. J.

    2015-06-01

    This study aims to develop a prototype for an Automated Car Park Management System that will increase the quality of service of parking lots through the integration of a smart system that assists motorist in finding vacant parking lot. The research was based on implementing an operating system and a monitoring system for parking system without the use of manpower. This will include Parking Guidance and Information System concept which will efficiently assist motorists and ensures the safety of the vehicles and the valuables inside the vehicle. For monitoring, Optical Character Recognition was employed to monitor and put into list all the cars entering the parking area. All parking events in this system are visible via MATLAB GUI which contain time-in, time-out, time consumed information and also the lot number where the car parks. To put into reality, this system has a payment method, and it comes via a coin slot operation to control the exit gate. The Automated Car Park Management System was successfully built by utilizing microcontrollers specifically one PIC18f4550 and two PIC16F84s and one PIC16F628A.

  10. Analysis of compliance and irregularity between Management Conservation and Director Plans: a case study of Birds Natural Park in the city of Rio das Ostras

    Directory of Open Access Journals (Sweden)

    Adiane Conceição de Oliveira

    2010-05-01

    Full Text Available In the presente work, the Director Plan of Rio das Ostras, Rio de Janeiro, Brazil, and the Management Plan of a municipal Conservation Unit (CU named Birds Natural Park were investigated aiming at detecting possible territorial management conflicts, as well as pointing out potential of using these two regulations as tools for improving life quality and for developing sustainable local strategies. The study allowed for the inference of the need to review not only the Director Plans of mediumsized cities, but also the Managements Plans of the Conservation Units (CUs. Furthermore, Director Plans must be consistent in terms of articles and objectives, detailing sustainable projects for CUs by means of action plans, chronograms for the implementation of ecological corridors, and use and occupation of CUs buffer zone criteria.

  11. Assessing Tourists’ Preferences for Recreational Trips in National and Natural Parks as a Premise for Long-Term Sustainable Management Plans

    Directory of Open Access Journals (Sweden)

    Diana E. Dumitras

    2017-09-01

    Full Text Available Sustainable tourism management plans rely on relevant and consistent information about factors that can influence the decision to visit a protected area. This paper uses the choice experiment method to investigate tourists’ preferences with regard to recreational trip characteristics in national and natural parks in Romania. An on-site survey questionnaire was administered to visitors. The multinomial logit model was employed to investigate the preference orderings of the identified groups of recreational users. Overall, results indicate that tourists gain benefits after visiting the parks. Main preference differences were found for information sources and location of campsites. Visitors who stated that the park was the main trip destination were willing to have access to more information sources, the marks on trails being insufficient. Camping is preferred only in organized places, expressing the concern for environmental protection. The results of this study have management implications, highlighting the importance of assessing tourists’ preferences as a foundation for developing sustainable tourism strategies.

  12. Smart parking management and navigation system

    KAUST Repository

    Saadeldin, Mohamed

    2017-01-01

    Various examples are provided for smart parking management, which can include navigation. In one example, a system includes a base station controller configured to: receive a wireless signal from a parking controller located at a parking space

  13. Ecological planning proposal for Kruger National Park

    Science.gov (United States)

    van Riet, W. F.; Cooks, J.

    1990-05-01

    This article discusses an application of the ecological planning model proposed by Van Riet and Cooks. The various steps outlined in this model have been applied to Kruger National Park in South Africa. The natural features of Kruger National Park, which form the basis of such an ecological planning exercise and from which the various land use categories, values, and zoning classes can be determined, are discussed in detail. The suitability of each of the various features is analyzed and a final zoning proposal for Kruger National Park is suggested. Furthermore a method for selecting a site for a new camp is illustrated by referring to the site for the new Mopane rest camp which is now under construction in the Kruger National Park. The conclusion is reached that the proposed ecological planning model can be used successfully in planning conservation areas such as Kruger National Park and for the selection of the most desirable sites for the establishment of new rest camps. Its suitability as a practical model in such planning exercises is proven by the fact that the siting proposals of two new camps based on this model have been accepted by the National Parks Board, the controlling body of Kruger National Park.

  14. Changes in forest cover in the Foresta della Lama (Casentino Forests National Park from Karl Siemon’s and Anton Seeland’s 1837 forest management plan

    Directory of Open Access Journals (Sweden)

    Vazzano E

    2011-05-01

    Full Text Available Forest estates with a long history of forest management plans are quite rare in Italy. In such cases, the analysis of historical documents combined with the use of GIS technology, can provide useful information on the evolution of forest cover and silvicultural and management techniques. Based on two unpublished documents by Karl Siemon and Anton Seeland dating back to 1837 and 1850, an archive of historical maps for the Lama Forest (Foreste Casentinesi, Monte Falterona and Campigna National Park was created using GIS techniques. This archive outlines the evolution of the Lama Forest over the last 170 years. Particular attention was given to silver fir plantations, which have strongly characterized silviculture and local economics in the Foreste Casentinesi area. The results of our analysis show that changes in different historical periods have been caused both by silvicultural interventions prescribed by the management plans and by external causes such as changes in forest property or war periods, which have markedly influenced forest area and stand characteristics. Furthermore, our analysis confirms that the work of Karl Siemon and Anton Seeland, carried out between 1835 and 1837, is the oldest forest management plan for an Italian forest. It is interesting to note that the aim of the plan, i.e., a regulated (or “normal” even-aged forest, and the way the plan was laid out, typical of classic forest management originated in Germany at the end of the XVIIIth century, served as model for the forest management plans drawn out by the Florence Forestry School almost until the end of the XXth century.

  15. 76 FR 45848 - Draft Environmental Impact Statement on a Denali Park Road Vehicle Management Plan for Denali...

    Science.gov (United States)

    2011-08-01

    ... meetings, and solicits comments on the DEIS. DATES: Comments on the DEIS must be received no later than... public meetings. FOR FURTHER INFORMATION CONTACT: Miriam Valentine, Park Planner, Denali National Park... Memorial Day and a week after Labor Day. As tourism in Alaska has increased, so have demands for visits...

  16. Smart parking management and navigation system

    KAUST Repository

    Saadeldin, Mohamed

    2017-11-09

    Various examples are provided for smart parking management, which can include navigation. In one example, a system includes a base station controller configured to: receive a wireless signal from a parking controller located at a parking space; determine a received signal strength indicator (RSSI) from the wireless signal; and identify a presence of a vehicle located at the parking space based at least in part on the RSSI. In another example, a method includes receiving a wireless signals from a base station controller and a parking controller located at a parking space; determining RSSIs from the wireless signals; and determining a location of the mobile computing device in a parking facility based at least in part on the RSSIs. In another example, a RSSI can be received, a parking occupancy can be determined using the RSSI, and an electronic record can be updated based on the parking occupancy.

  17. Development of improved ambient computation methods in support of the National Parks Air Tour Management Act

    Science.gov (United States)

    2008-09-01

    Approximately 85 National Park units with commercial air tours will need Air Tour : Management Plans (ATMPs). The objective of an ATMP is to prevent or mitigate : significant adverse impacts to National Park resources. Noise impacts must be : charact...

  18. Making parks make a difference: poor alignment of policy, planning and management with protected-area impact, and ways forward.

    Science.gov (United States)

    Pressey, Robert L; Visconti, Piero; Ferraro, Paul J

    2015-11-05

    Policy and practice around protected areas are poorly aligned with the basic purpose of protection, which is to make a difference. The difference made by protected areas is their impact, defined in program evaluation as the outcomes arising from protection relative to the counterfactual of no protection or a different form of protection. Although impact evaluation of programs is well established in fields such as medicine, education and development aid, it is rare in nature conservation. We show that the present weak alignment with impact of policy targets and operational objectives for protected areas involves a great risk: targets and objectives can be achieved while making little difference to the conservation of biodiversity. We also review potential ways of increasing the difference made by protected areas, finding a poor evidence base for the use of planning and management 'levers' to better achieve impact. We propose a dual strategy for making protected areas more effective in their basic role of saving nature, outlining ways of developing targets and objectives focused on impact while also improving the evidence for effective planning and management. © 2015 The Authors.

  19. 76 FR 17471 - Air Tour Management Plan for Haleakala National Park, Maui, HI; Public Meeting/Notice of...

    Science.gov (United States)

    2011-03-29

    ... Haleakala National Park, Maui, HI; Public Meeting/Notice of Availability, Review, and Comment on...), Alexa Higashi Meeting Room, One Cameron Way, Kahului, HI 96732. Wednesday, April 13, 2011, 5 p.m.-7 p.m. Kula Community Center, 3690 Lower Kula Road, Kula, HI 96790. Thursday, April 14, 2011, 5 p.m.-7 p.m...

  20. Smart parking management system with decal electronics system

    KAUST Repository

    Hussain, Muhammad Mustafa; Wicaksono, Irmandy

    2017-01-01

    Various examples are related to parking management, including identifying and reserving empty parking spaces. In one example, a smart parking space system includes a parking controller located at a parking space. The parking controller can identify a vehicle located at the parking space via an input sensor or a transceiver that initiates wireless communication with an electronic tag associated with the vehicle; and communicate a parking vacancy associated with the parking space to a remote computing device based at least in part on the identification of the vehicle. In another example, a computing device can receive parking vacancy data associated with a parking space from a parking controller; determine a parking vacancy associated with the parking space using the parking vacancy data; and encode for display on a client device a network page that includes an indication of the parking vacancy associated with the parking space.

  1. Smart parking management system with decal electronics system

    KAUST Repository

    Hussain, Muhammad Mustafa

    2017-09-21

    Various examples are related to parking management, including identifying and reserving empty parking spaces. In one example, a smart parking space system includes a parking controller located at a parking space. The parking controller can identify a vehicle located at the parking space via an input sensor or a transceiver that initiates wireless communication with an electronic tag associated with the vehicle; and communicate a parking vacancy associated with the parking space to a remote computing device based at least in part on the identification of the vehicle. In another example, a computing device can receive parking vacancy data associated with a parking space from a parking controller; determine a parking vacancy associated with the parking space using the parking vacancy data; and encode for display on a client device a network page that includes an indication of the parking vacancy associated with the parking space.

  2. Tourism and recreation system planning in Alberta provincial parks

    Science.gov (United States)

    Paul F.J. Eagles; Angela M. Gilmore; Luis X. Huang; Denise A. Keltie; Kimberley Rae; Hong Sun; Amy K. Thede; Meagan L. Wilson; Jennifer A. Woronuk; Ge Yujin

    2007-01-01

    Traditionally, system planning in parks and protected areas concentrated on biogeographical concepts, while neglecting tourism and recreation. The existing system plan for parks and protected areas in Alberta, Canada, divides the province into six natural regions based on a geographic classifi cation system (Grassland, Parkland, Foothills, Rocky Mountains, Boreal...

  3. Services for People Innovation ParkPlanning Methodologies

    Directory of Open Access Journals (Sweden)

    Maria Angela Campelo de Melo

    2013-04-01

    Full Text Available This article aims to identify appropriate methodologies for the planning of a Services for People Innovation Park-SPIP, designed according to the model proposed by the Ibero-American Network launched by La Salle University of Madrid. Projected to form a network, these parks were conceived to provoke social change in their region, improving quality of life and social welfare, through knowledge, technology and innovation transfer and creation of companies focused on developing product and services to reduce social inequalities. Building a conceptual framework for the identification of planning methodologies compatible with the SPIP problemátique, this article analyses the theories of complex systems and adaptive planning, considering the particularities presented by Innovation Parks. The study deepens the understanding of the problems inherent in park planning, identifies the key issues to be considered during this process, and characterizes the SPIP as active adaptive complex system, suggesting methodologies more appropriate to its planning.

  4. Visitation in island parks: indicators as a tool for management

    Directory of Open Access Journals (Sweden)

    Ginessa Corrêa Lemos

    2013-12-01

    Full Text Available Park visitation has been increasing every year; however, the majority of the protected areas have no satisfactory and qualified administrative structure to control visitation, especially when island ecosystems are considered. The State Park of Ilhabela (PEIb is a good example of this, and was therefore selected for this study, which hoped to identify indicators for better management of park visitation. In order to select indicators to be used as a reference for this purpose, this study employed the Bountîle – Base of observation for nautical and terrestrial purposes within islands - developed by French researchers for the National Park of Port-Cros, and complemented this with guidelines from the Brazilian Ministry of Environment and other authors. These led to the selection of the following indicators: a opportunities of recreation for a diverse public; b visitation security; c satisfaction with the experience; d minimal environmental impact; e spinoff of socioeconomic development of the surrounding community. Based on the PEIb analyses, 20 management indicators were identified using the following criteria: uses and users; climatic conditions; well-being of the residents; security; profile of the visitor; well-being of the visitors; behavior of the visitors; certification, management, and institutional integration. The criteria of the indicators is greatly diversified, as it is believed that such diversity is essential to encompass the varied aspects that must be considered by a visitation management system in a conservation area. The indicators are flexible, and can be changed anytime, so that they will always be in harmony with the goals of the park management plan. In order to be efficient, they should be feasible economically, technically, and operationally. It is essential that indicators and protocols be discussed and tested with park workers and local actors, ensuring active management and continuous monitoring.

  5. Advanced parking management systems : a cross-cutting study : taking the stress out of parking

    Science.gov (United States)

    2007-01-01

    This study examines advanced parking management systems (APMSs) in three venues: airports, central business districts, and transit park-and-ride locations. Specifically, the systems examined in this study provide directional and space availability in...

  6. A Framework for the Strategic Management of Science & Technology Parks

    Directory of Open Access Journals (Sweden)

    Juliane Ribeiro

    2016-12-01

    Full Text Available Science and technology parks (STPs have been playing an increasingly influential role in the stimulation and growth of the knowledge economy. However, the spread of STPs faces relevant challenges, such as the development of robust performance management systems, able to demonstrate results and indicate improvement opportunities. Thereby, this paper proposes a theoretical model of performance management, which combines premises of the Service-Dominant Logic (S-D Logic, the Balanced Scorecard (BSC and the General Hierarchical Model (GHM. Based on a multiple-case exploratory and qualitative study, relevant information about the strategic planning and management of these projects were extracted and paved the way for the construction of a performance hierarchical model composed of five perspectives, according to the BSC. Considering the outcomes, it is expected that the proposed model provide useful insights for the consolidation of a framework for the strategic management of science and technology parks.

  7. The comparative analyses of selected aspects of conservation and management of Vietnam’s national parks

    Directory of Open Access Journals (Sweden)

    Le Thanh An

    2018-01-01

    Full Text Available The national parks in Vietnam are protected areas in the national system of special-use forests created to protect natural resources and biodiversity. In order to improve the effectiveness of management of national parks, the study assesses some current aspects of conservation and management of natural resources with respect to management plans, financial sources, staff, cooperative activities, causes of limited management capacity and threats to natural resources. Out of the total of 30 national parks, six are under the responsibility of the Vietnam Administration of Forestry (VNFOREST and 24 national parks are managed by provincial authorities. It was found that most of the national parks have updated their management plans. Financial sources of funding for national parks mainly originated from the central and provincial budgets, with an average of 51% and 76% respectively. Fifty percent of national parks spent 40–60% of their total funding on conservation activities. About 85% of national parks’ staff had academic degrees, typically in the fields of forestry, agriculture and fisheries. Biodiversity conservation was considered a priority cooperative action in national parks with scientific institutes. Major causes of a limited management capacity of national parks included human population growth and pressure associated with resources use, lack of funding, limited human and institutional capacity and land use conflict/land grab. Illegal hunting, trapping, poaching and fishing, the illegal wildlife trade, illegal logging and firewood collecting appeared to be the most serious threats to the conservation and management of natural resources. In addition to these results, significant differences were found between the VNFOREST and provincial parks in terms of financial sources, staff and the threat of illegal logging and firewood collecting. The authors’ findings offer useful information for national park planners and managers, as well as

  8. Strategic Management of Tourism in the National Parks (Case: National Park Skadar Lake

    Directory of Open Access Journals (Sweden)

    Iva Bulatović

    2015-07-01

    Full Text Available In this paper we will try to prepare strategic analysis in order to give right guidelines for national park’s management. We are going to analyze National Park Skadar Lake as a tourist destination. We will use different strategic tools for proper analysis such as Life Cycle Concept, Boston Consulting Group Matrix, Ansoff Matrix, and McKinsey matrix. A strategy that involves penetration of the market would be desirable in the case of developing excursion, cultural – religious tourism, event tourism, hunting and fishing tourism, and wine tourism. Furthermore, market diversification is essential when it comes to new tourist products such as eco-tourism, rural tourism, scientific research, MICE tourism, golf and camping tourism, while the transformation of existing and introduction of new tourist products is expected within the sport - recreational, health, culture, excursions, wine tourism, etc.The paper will provide a framework for future research in the field of strategic management of tourism development in national parks. This topic has not yet been thoroughly analyzed and it is expected to serve as the basis of a strategic plan for managing tourism in the National Park Skadar Lake and / or as an incentive for researchers to enter more deeply into the issue

  9. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park, Hawaii AGENCY: National Park Service, Interior. ACTION: Notice of intent. SUMMARY: The National Park... updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  10. Implementation of ergonomics in the management of parking increasing the quality of living parking park in mall Robinson Denpasar city

    Science.gov (United States)

    Sutapa, I. K.; Sudiarsa, I. M.

    2018-01-01

    The problems that often arise in the area of Denpasar City mostly caused by parking problems at the centers of activities such as shopping centers. The problems that occur not only because of the large number of vehicles that parked but also the result of the condition of parking officers who have not received attention, there is no concern about the physical condition of parking attendants because doing night guard duty. To improve the quality of parking officer, ergonomic parking lot is improved through the application of appropriate technology with systemic, holistic, interdisciplinary and participatory approach. The general objective of the research is to know the implementation of ergonomics in parking management on the improvement of the quality of parking officer in Robinson shopping center. The indicator of the quality of the parking officer work is the decrease of musculoskeletal complaints, fatigue, workload, boredom and increasing work motivation. The study was conducted using the same subject design, involving 10 subjects as a simple random sample. Intervention is done by arrangement of ergonomic basement motorcycle parking. Measurements done before and after repair. Washing out (WO) for 14 days. The data obtained were analyzed descriptively, tested normality (shapirowilk) and homogeneity (Levene Test). For normal and homogeneous distribution data, different test with One Way Anova, different test between Period with Post Hoc. Normally distributed and non-homogeneous data, different test with Friedman Test, different test between periods using Wilcoxon test. Data were analyzed with significance level of 5%. The results showed that the implementation of ergonomic in the management of parking area of the court decreased musculoskeletal complaints by 15.10% (p management of the parking lot improves the quality of the parking officer work from: (1) decrease of musculoskeletal complaints, (2) decrease of melting rate, (3) decrease of parking workload

  11. Park Planning for Ageing Adults Using Grounded Theory Methodology

    Directory of Open Access Journals (Sweden)

    Bernie Dahl

    2004-06-01

    Full Text Available The importance of understanding park planning issues and implementing planning strategies for ageing adults was the driving force for this study. Literature reviews have identified a variety of scholarly work from fields such as gerontology, psychology, sociology and economics, all of which provide valuable information regarding the special needs of ageing adults. Very few researchers, however, have investigated the leisure behaviours of older adults in outdoor recreation (Croskeys, Tinsley and Tinsley, 2002 and the use of grounded theory methodology has essentially been unexplored in this area. Ageing adults are projected to live more than 20 percent of their life in retirement (MRP, 1998, cited in Croskeys, Tinsley and Tinsley, 2002, allowing for an increased amount of discretionary time. This offers opportunities for ageing adults to participate in outdoor recreational activities and will undoubtedly increase their leisure time. However, with limited research in recreational needs and inclusion for older adults, it is difficult for park planners and administrators to meet the growing needs of this population. Therefore, this research is necessary in order to determine whether ageing adults are being accounted for in park and outdoor recreational planning. The objective of this study was to use grounded theory research methodology to identify and examine ageing adult needs in relation to outdoor leisure activities in a regional park setting. Ten Midwestern regional park visitors (aged 65-75 years old and four park employees were interviewed. Our research attempts to fill in the gaps between the perceptions of ageing park users and those of park planners, using a methodology that relies primarily on direct contact with park visitors.

  12. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  13. Services for People Innovation ParkPlanning Methodologies

    OpenAIRE

    Maria Angela Campelo de Melo; Lygia Magalhães Magacho

    2013-01-01

    This article aims to identify appropriate methodologies for the planning of a Services for People Innovation Park-SPIP, designed according to the model proposed by the Ibero-American Network launched by La Salle University of Madrid. Projected to form a network, these parks were conceived to provoke social change in their region, improving quality of life and social welfare, through knowledge, technology and innovation transfer and creation of companies focused on developing product and servi...

  14. Recreational user attitudes towards management strategies of Allegany State Park

    Science.gov (United States)

    Michael Nisengard; Miklos Gratzer

    1998-01-01

    This project examines attitudes towards management strategies of four Allegany State Park recreational user groups: cabin users, recreational vehicle users, tent users, and day users. It investigates recreational user group attitude differences, and attitude change over a ten year time period, in regard to the following park management strategy categories: park...

  15. Managing urban parks for a racially and ethnically diverse clientele

    Science.gov (United States)

    Paul H. Gobster

    2002-01-01

    A major planning effort for Chicago's largest park provided an opprotunity yto examine outdoor recreation use patterns and preferences among a racially and ethnically diverse clientele. Results from on-site surveys of 898 park users (217 Black, 210 Latino, 182 Asian, and 289 White) showed that park users shared a core set of interests, preferences, and concerns...

  16. Conditions for the management of carrying capacity in the parks of Parks&Benefits

    DEFF Research Database (Denmark)

    Brandt, Jesper; Holmes, Esbern

    2011-01-01

    Growth in the number of visitors is an upcoming problem in nature parks. Nature parks are at the same time facing increasing demand, falling public appropriations and receding focus on their conservation functions. To ensure a balancing of nature protection and economic utilization the concept...... stakeholders, balancing use and protection preferably based on scientific and/or experiential cognition. The conditions for the management of carrying capacity for the 8 nature parks in the EC Baltic Project Parks&Benefits are analysed in the report. 1. Part focus on the methodology, concentrated...... on the comparison of the common conditions related to the international nature protection obligations in the parks, primarily expressed through the management under the EU Natura2000-program. In part 2, a comparison of the 8 parks concerning extent, land use composition, population in and around the park...

  17. New challenges for grizzly bear management in Yellowstone National Park

    Science.gov (United States)

    van Manen, Frank T.; Gunther, Kerry A.

    2016-01-01

    A key factor contributing to the success of grizzly bear Ursus arctos conservation in the Greater Yellowstone Ecosystem has been the existence of a large protected area, Yellowstone National Park. We provide an overview of recovery efforts, how demographic parameters changed as the population increased, and how the bear management program in Yellowstone National Park has evolved to address new management challenges over time. Finally, using the management experiences in Yellowstone National Park, we present comparisons and perspectives regarding brown bear management in Shiretoko National Park.

  18. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  19. Lake Mead National Recreational Area air tour management plan and planning and National Environmental Policy Act scoping document

    Science.gov (United States)

    2004-04-19

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Lake Mead National Recreation Area (LAME) pursuant to the National Parks Air Tour ...

  20. A Practical Application of Statistical Gap Analysis in National Park Management in Costa Rica

    Directory of Open Access Journals (Sweden)

    Aguirre González, Juan Antonio

    2009-04-01

    Full Text Available If the tourism growth predicted materialized as tourism for Costa Rica protected areas would see major increases. A study conducted in Volcan Poas National Park and Volcan Turrialba National Park two of Costa Rica leading volcanic crater parks was undertaken to make available to national parks and protected areas managers, a procedure, that could be use: to measure using an adapted form of the expectations disconfirmation theory the satisfaction of visitors to Costa Rica national parks, and to evaluate if the results could be used for establishing the areas of the park infrastructure, services and recreational options that needed improvement and management decisions to enhance visitor's satisfaction. The sample included 1414 surveys The findings indicates that the procedure adapted base on the expectations-disconfirmation model was proven helpful in: a getting the information to help “zero in”, the man-agement decisions in the short and medium term and for the development of the Tourist Management Plans that is to say being developed in the 2 sites, b guiding park managers in the resource allocation process, under the conditions of scarcity that are so common in developing countries, c facilitating regular monitoring of the conditions, with a simple and quick methodology that can be used for “day to day” decisions and more sophisticated statistical analysis d identifying the areas in the management of protected areas that need further analysis and in that way is contributing to the development of the long term socio-economic research programs in national parks, e the “real” importance of the information and education activities in national parks, combination of activities that seems to be critical to enhance “consumer satisfaction” among the visitors to national parks everywhere and particularly as a means of understanding whether visitors needs and expectations are met, whether they receive what they should and as a context for

  1. Natural resource assessment: an approach to science based planning in national parks

    Science.gov (United States)

    Mahan, C.G.; Vanderhorst, J.P.; Young, J.A.

    2009-01-01

    We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge-a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands.

  2. 77 FR 6581 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park, Idaho...

    Science.gov (United States)

    2012-02-08

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0070-422] Winter Use Plan, Supplemental... the Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to the National Environmental Policy... Statement (SEIS) for a Winter Use Plan for Yellowstone National Park, located in Idaho, Montana and Wyoming...

  3. 75 FR 4842 - Winter Use Plan, Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2010-01-29

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Environmental Impact Statement... to prepare an Environmental Impact Statement for a Winter Use Plan, Yellowstone National Park... Park Service (NPS) is preparing an Environmental Impact Statement (EIS) for a Winter Use Plan for...

  4. Engineering Geology Maps for Planning and Management of Natural Parks: “Las Batuecas-Sierra de Francia” and “Quilamas” (Central Spanish System, Salamanca, Spain

    Directory of Open Access Journals (Sweden)

    Mariano Yenes

    2013-01-01

    Full Text Available Presented herein is a cartographic procedure that is easy to utilise and at low-cost, which facilitates the first stages of planning and management of a naturally protected space and considers the geotechnical parameters that influence human activity. This procedure uses geographical information systems technology by combining the cartographies for the most influential parameters on the stability of the area (lithology, hydrogeology, geomorphology, slopes, lineament/fractures and seismicity with geomechanical mapping generated from geotechnical parameters obtained through field and laboratory tests. This geotechnical mapping facilitates the division of a territory into zones according to each type of problem and generates a cartography for natural hazards. Using this information, it is possible to produce a cartography of constructive conditions or geotechnical hazards. This methodology has been validated by application to two natural protected spaces, “Las Batuecas-Sierra de Francia” and “Quilamas”. The validation confirmed that the cartography procedure described herein is a preventive, and not a structural measure. It is a tool that delimits areas with different constructive use recommendations and limitations, and therefore, is useful for natural space managers.

  5. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  6. Geomorphology applied to landscape analysis for planning and management of natural spaces. Case study: Las Batuecas-S. de Francia and Quilamas natural parks, (Salamanca, Spain).

    Science.gov (United States)

    Martínez-Graña, A M; Silva, P G; Goy, J L; Elez, J; Valdés, V; Zazo, C

    2017-04-15

    Geomorphology is fundamental to landscape analysis, as it represents the main parameter that determines the land spatial configuration and facilitates reliefs classification. The goal of this article is the elaboration of thematic maps that enable the determination of different landscape units and elaboration of quality and vulnerability synthetic maps for landscape fragility assessment prior to planning human activities. For two natural spaces, the final synthetic maps were created with direct (visual-perceptual features) and indirect (cartographic models and 3D simulations) methods from thematic maps with GIS technique. This enabled the creation of intrinsic and extrinsic landscape quality maps showing sectors needing most preservation, as well as intrinsic and extrinsic landscape fragility maps (environment response capacity or vulnerability towards human actions). The resulting map shows absorption capacity for areas of maximum and/or minimum human intervention. Sectors of high absorption capacity (minimum need for preservation) are found where the incidence of human intervention is minimum: escarpment bottoms, fitted rivers, sinuous high lands with thick vegetation coverage and valley interiors, or those areas with high landscape quality, low fragility and high absorption capacity, whose average values are found across lower hillsides of some valleys, and sectors with low absorption capacity (areas needing most preservation) found mainly in the inner parts of natural spaces: peaks and upper hillsides, synclines flanks and scattered areas. For the integral analysis of landscape, a mapping methodology has been set. It comprises a valid criterion for rational and sustainable planning, management and protection of natural spaces. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  8. 75 FR 4102 - Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan/Resource Management Plan AGENCY: Bureau of Reclamation... review and comment a joint Final EIS/EIR for the Folsom Lake State Recreation Area and Folsom Power House...

  9. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014......maximum 200 words) Navy Supply Systems Command (NAVSUP) lacks a business process framework for the development of Business Continuity Management

  10. The inherent politics of quality in public park management

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Konijnendijk, Cecil Cornelis; Fors, Hanna

    2012-01-01

    In this paper, we highlight and illustrate the inherent politics embedded in “quality” as a concept for managing public parks. Reflecting more generic quality concepts, contemporary quality models in park management include concepts for both operational, strategic and stakeholder management as well...... managing the park organisation itself. However, quality concepts and their application through various management models include as well as exclude the access, values and worldviews of particular interests. In this way, any particular quality concept and model embeds its own politics by inherent...... allocations of ‘who gets what, when and how’. We illustrate the inherent politics by providing a case study of a widely adopted quality model for operational management that has been adopted and implemented in Denmark as part of new public management reforms. In perspective, other quality concepts and models...

  11. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  12. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  13. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  14. Development and Implementation of a Model Training Program to Assist Special Educators, Parks and Resource Management Personnel and Parents to Cooperatively Plan and Conduct Outdoor/Environmental Education Programs for Handicapped Children and Youth. Final Report.

    Science.gov (United States)

    Vinton, Dennis A.; Zachmeyer, Richard F.

    This final report presents a description of a 3-year project to develop and implement a model training program (for special education personnel, park and resource management personnel, and parents of disabled children) designed to promote outdoor environmental education for disabled children. The project conducted 22 training workshops (2-5 days)…

  15. 78 FR 12353 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2013-02-22

    ...] Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park AGENCY: National... Final Supplemental Environmental Impact Statement (SEIS) for a Winter Use Plan for Yellowstone National... link to the 2012 Supplemental Winter Use Plan EIS), and at Yellowstone National Park headquarters...

  16. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Science.gov (United States)

    2011-11-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact.... ACTION: Notice of availability of the Final Environmental Impact Statement for the Winter Use Plan... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and [[Page 68504

  17. 75 FR 39581 - Yosemite Valley Plan; Yosemite National Park; Mariposa, Madera, and Tuolumne Counties, California...

    Science.gov (United States)

    2010-07-09

    ... DEPARTMENT OF THE INTERIOR National Park Service Yosemite Valley Plan; Yosemite National Park; Mariposa, Madera, and Tuolumne Counties, California; Notice of Revised Record of Decision SUMMARY: On December 29, 2000, the National Park Service (NPS) executed a Record of Decision selecting Alternative 2...

  18. Role of parking in the hotel supply chain management

    Directory of Open Access Journals (Sweden)

    Robert Maršanić

    2015-12-01

    Full Text Available Background: Supply chain management in tourism has only recently become the topic of the scientific research. The hotel product as a tourist product presents a specific mix of services and products The focus of this study has been placed on the hotel company, that, in order to create such a product, builds its own network of partners (companies, co-workers, to bring together and coordinate activities intended to result in the desired features of the hotel product. This study was evaluated as a scientifically relevant because until now the position of parking services in the hotel product has not been analyzed from the perspective of the hotel efforts and abilities to provide parking places for their guests by analyzing to which extent a good and available parking space really affects the quality of the hotel product. The aim of the study was to define the framework in which the supply chain management acts with reference to the parking service and stakeholders in the network. Methods: The method of interviewing hotel managers was used to obtain necessary data. Through the simple numerical calculations including the number of parking spaces and the capacity of the hotel accommodation we tried to identify the interrelationship, i.e. the degree of alignment of the respective sizes. Results: It turned out that towns of Rijeka and Opatija are faced with a shortage of parking spaces, especially during the tourist season. The trend of providing parking services for guests in hotel-owned garages or car parks is typical for the everyday hotel operation and the shortage of such an option, is resolved through the lease of a certain number of parking spaces in public garages and car parks. These parking spaces are away from the hotel, the guests' dissatisfaction is a normal consequence of such a decision and it is mitigated through the commercial measures. Hotel management considers a provided parking space an important element of the hotel product quality

  19. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  20. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  1. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Science.gov (United States)

    2013-12-06

    ...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...

  2. Use of single large or several small policies as strategies to manage people-park interactions.

    Science.gov (United States)

    Mackenzie, Catrina A; Baird, Timothy D; Hartter, Joel

    2014-12-01

    Biodiversity conservation has been criticized for undermining or ignoring social well-being. Currently efforts to mutually promote social justice, rural development, and biodiversity conservation, which have been contentious and yielded mixed results, continue to spread despite a general dearth of effective management strategies. We contend that social and economic concerns should be integral to conservation planning and propose that the scale of these phenomena is also critical. To evaluate the merit of this proposal, we adopted and expanded a conservation management strategy framework developed by Joel Heinen and examined how population density, economic disparity, and ethnic heterogeneity vary spatially surrounding 2 contrasting protected areas in East Africa: Kibale National Park in Uganda and Tarangire National Park in Tanzania. Analyses of demographic, wealth, and ethnicity data from regional censuses and household surveys conducted in 2009 and 2010 indicated that choice of scale (landscape or community) changed the management strategies recommended by the model. Therefore, "several small" people-park management strategies varying around a given protected area may be more appropriate than a "single large" people-park strategy applied across an entire protected area. Correspondingly, scale adjusted Heinen recommendations offered new strategies for effective conservation management within these human landscapes not incorporated in current in situ management plans. © 2014 Society for Conservation Biology.

  3. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  4. 14 CFR 136.39 - Air tour management plans (ATMP).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall... of decision. (d) Procedure. In establishing an ATMP for a national park or tribal lands, the...

  5. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  6. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  7. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  8. The stakes of the park management in the lasting quality

    International Nuclear Information System (INIS)

    Caseau, P.

    1996-01-01

    The goal of this paper is to surround the stakes of the management in the lasting quality and not to give a table of problems. The actual situation shows two characteristics; the profit margins in the nuclear industry are very small, the economic growth is small too. The advantage of the operating park on any other kind electric source is extremely strong. So it is important to keep the actual park even if operating and maintenance costs increase. If a forty years life time allows to go until 2020 and fifty years until 2030 it is possible to consider that the comparison 'installed park cost/any other production mean cost' leads to keep the actual park until 2015-2025. The first reason is an economic reason. The second reason is connected to what will happen after, that is to say the replacement conditions.To be able to define in the best conditions a new park, devoted to last 60 years or more, that is the second reason to manage the actual park in the lasting quality. (N.C)

  9. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  10. Management of Logistics Planning

    OpenAIRE

    Bjørnar Aas; Stein W. Wallace

    2010-01-01

    Logistics problems are gradually becoming more complex and a better understanding of logistics management as a subject is a key to deal with the new challenges. A core element of logistics management is logistics planning, which substitutes for low customer service levels, high waste, and the use of buffers and slacks in the execution of logistic activities. Furthermore, the availability of information and problem-solving capabilities are established as the core parts of logistics planning. B...

  11. Spatial strategies for managing visitor impacts in National Parks

    Science.gov (United States)

    Leung, Y.-F.; Marion, J.L.

    1999-01-01

    Resource and social impacts caused by recreationists and tourists have become a management concern in national parks and equivalent protected areas. The need to contain visitor impacts within acceptable limits has prompted park and protected area managers to implement a wide variety of strategies and actions, many of which are spatial in nature. This paper classifies and illustrates the basic spatial strategies for managing visitor impacts in parks and protected areas. A typology of four spatial strategies was proposed based on the recreation and park management literature. Spatial segregation is a common strategy for shielding sensitive resources from visitor impacts or for separating potentially conflicting types of use. Two forms of spatial segregation are zoning and closure. A spatial containment strategy is intended to minimize the aggregate extent of visitor impacts by confining use to limited designated or established Iocations. In contrast, a spatial dispersal strategy seeks to spread visitor use, reducing the frequency of use to levels that avoid or minimize permanent resource impacts or visitor crowding and conflict. Finally, a spatial configuration strategy minimizes impacting visitor behavior though the judicious spatial arrangement of facilities. These four spatial strategics can be implemented separately or in combination at varying spatial scales within a single park. A survey of national park managers provides an empirical example of the diversity of implemented spatial strategies in managing visitor impacts. Spatial segregation is frequently applied in the form of camping restrictions or closures to protect sensitive natural or cultural resources and to separate incompatible visitor activities. Spatial containment is the most widely applied strategy for minimizing the areal extent of resource impacts. Spatial dispersal is commonly applied to reduce visitor crowding or conflicts in popular destination areas but is less frequently applied or

  12. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0070-422] Winter Use Plan, Supplemental.... ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter... Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan for Yellowstone National Park...

  13. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  14. Black rhinoceros Diceros bicomis capture, transportation and boma management by the Natal Parks Board

    Directory of Open Access Journals (Sweden)

    R.R. Henwood

    1989-10-01

    Full Text Available Selected Papers from the Rhinoceros Conservation Workshop, Skukuza, Kruger National Park,31 August – 4 September 1988 The procedure used by the Natal Parks Board in the capture of black rhinoceros Diceros bicomis minor (Drummond, 1876 is outlined. It is emphasised that a successful capture operation requires careful planning and should not be attempted by the uninitiated or by parties who have little or no experience. Dosages of drugs are given, the darting and actual capture procedures highlighted, and aspects of transport and practical boma management are described.

  15. 75 FR 1806 - Draft General Management Plan and Environmental Impact Statement, New River Gorge National River, WV

    Science.gov (United States)

    2010-01-13

    ... visitor experiences. Management actions would build upon the cultural resource, interpretive, and... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...

  16. Evaluation of parking management strategies for urban areas : final report.

    Science.gov (United States)

    1980-01-01

    The state of the art of parking management in urban areas in the United States was established using an extensive review of the literature and a nationwide questionnaire survey that was distributed to 458 city officials, 173 of whom responded. Based ...

  17. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  18. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  19. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  20. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  1. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  2. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  3. Structure of a forested urban park: implications for strategic management.

    Science.gov (United States)

    Millward, Andrew A; Sabir, Senna

    2010-11-01

    Informed management of urban parks can provide optimal conditions for tree establishment and growth and thus maximize the ecological and aesthetic benefits that trees provide. This study assesses the structure, and its implications for function, of the urban forest in Allan Gardens, a 6.1 ha downtown park in the City of Toronto, Canada, using the Street Tree Resource Analysis Tool for Urban Forest Managers (STRATUM). Our goal is to present a framework for collection and analysis of baseline data that can inform a management strategy that would serve to protect and enhance this significant natural asset. We found that Allan Garden's tree population, while species rich (43), is dominated by maple (Acer spp.) (48% of all park trees), making it reliant on very few species for the majority of its ecological and aesthetic benefits and raising disease and pest-related concerns. Age profiles (using size as a proxy) showed a dominance of older trees with an inadequate number of individuals in the young to early middle age cohort necessary for short- to medium-term replacement. Because leaf area represents the single-most important contributor to urban tree benefits modelling, we calculated it separately for every park tree, using hemispheric photography, to document current canopy condition. These empirical measurements were lower than estimates produced by STRATUM, especially when trees were in decline and lacked full canopies, highlighting the importance of individual tree condition in determining leaf area and hence overall forest benefits. Stewardship of natural spaces within cities demands access to accurate and timely resource-specific data. Our work provides an uncomplicated approach to the acquisition and interpretation of these data in the context of a forested urban park. Copyright 2010 Elsevier Ltd. All rights reserved.

  4. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  5. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  6. 78 FR 13379 - Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations

    Science.gov (United States)

    2013-02-27

    ...] Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations AGENCY: National...) unpatented placer claims within Wrangell-St. Elias National Park and Preserve. Public Availability: This plan...: Wrangell-St. Elias National Park and Preserve Headquarters, Mile 106.8 Richardson Highway, Post Office Box...

  7. Smart Parking Management Field Test: A Bay Area Rapid Transit (BART) District Parking Demonstration

    OpenAIRE

    Shaheen, Susan

    2005-01-01

    In almost every major city in the U.S. and internationally, parking problems are ubiquitous. It is well known that the limited availability of parking contributes to roadway congestion, air pollution, and driver frustration and that the cost of expanding traditional parking capacity is frequently prohibitive. However, less research has addressed the effect of insufficient parking at transit stations on transit use. In the San Francisco Bay Area, parking has recently been at or near capacity a...

  8. Waste management plan - plant plan

    International Nuclear Information System (INIS)

    Gaudet, F.

    2008-01-01

    The author summarizes the nuclear activity of the Pierre Fabre Research Institute (sites, used radionuclides, radioprotection organisation), indicates the applied regulation, gives a brief analytical overview of the waste collection, sorting and elimination processes, of the management process for short period wastes and for long period wastes, and of the traceability and control procedures. He briefly presents some characteristics of the storing premises

  9. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Science.gov (United States)

    2013-07-19

    ... effort will result in an integrated visitor and transportation management plan for the Going-to-the Sun... sustainability of the park's shuttle system, management of visitor use, and congestion and protection of natural...] Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National Park...

  10. Scenario Planning Provides a Framework for Climate Change Adaptation in the National Park Service

    Science.gov (United States)

    Welling, L. A.

    2012-12-01

    Resource management decisions must be based on future expectations. Abundant evidence suggests climate change will have highly consequential effects on the Nation's natural and cultural resources, but specific impacts are difficult to accurately predict. This situation of too much information but not enough specificity can often lead to either paralysis or denial for decision makers. Scenario planning is an emerging tool for climate change adaptation that provides a structured framework for identifying and exploring critical drivers of change and their uncertain outcomes. Since 2007, the National Park Service (NPS) has been working with its partners to develop and apply a scenario-based approach for adaptation planning that integrates quantitative, model-driven, climate change projections with qualitative, participatory exercises to explore management and policy options under a range of future conditions. Major outcomes of this work are (1) increased understanding of key scientific results and uncertainties, (2) incorporation of alternative perspectives into park and landscape level planning, (3) identification of "no brainer" and "no gainer" actions, (4) strengthening of regional science-management partnerships, and (5) overall improved capacity for flexible decision making. The basic approach employed by NPS for scenario planning follows a typical adaptive management process: define the focal question, assess the relevant science, explore plausible futures, identify effective strategies, prioritize and implement actions, and monitor results. Many science and management partners contributed to the process, including NOAA Regional Integrated Science and Assessment teams (RISAs) and Regional Climate Centers (RCCs), USGS Research Centers, and other university and government scientists. The Global Business Network, an internationally recognized leader in scenario development, provided expert facilitation and training techniques. Climate science input is provided

  11. Analysis of Participatory Processes in the Formulation of Spatial Plan for Nature Park Medvednica

    Directory of Open Access Journals (Sweden)

    Nataša Lovrić

    2011-12-01

    Full Text Available Background and Purpose: This research aims to assess the stakeholders influence on spatial planning of Nature Park Medvednica, a mountainous protected area adjacent to Zagreb, the capital city of Croatia, which tries to hold on to the pressure of the urbanization. Because of the inexistence of spatial plan which is required with the Croatian laws, its area was significantly decreased in 2009. This kind of research has not been done yet for NP Medvednica, and it will provide a contribution to the process of developing a spatial Plan for NP Medvednica. Material and Methods: The study was conducted in the framework of stakeholder analysis, for which a series of in-depth interviews with - stakeholders were performed, and documents concerning the spatial plan were analysed. The data gained was processed in MAXQDA software for qualitative analysis. Results and Conclusion: The gathered data explains which are the disadvantages of the tree processes of the formulation of the spatial plan and is giving a possible theoretical explanation or a model which can be implied in any decision making process involving stakeholders in natural resources management in within a given political and cultural context. Description of the past and current spatial planning situation of the NP Medvednica was specified and issues and stakeholders concerning the creation of the spatial plan where identified. The key conflict areas that affect the formulation of spatial plan were detected and examined. The level of participation of stakeholders in the context of fulfilment of their own interests was assessed as well as the influence on participation processes of different stakeholder groups on the formulation of the spatial plan. In order to have proper citizens and stakeholders participation some changes in the legislation should take place.

  12. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  13. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  14. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  15. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Science.gov (United States)

    2013-09-09

    ....YP0000] Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation... the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA Citizens...

  16. 77 FR 33237 - Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National...

    Science.gov (United States)

    2012-06-05

    ... Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National Park, Inyo... an Environmental Impact Statement for the Saline Valley Warm Springs Management Plan, Death Valley... analysis process for the Saline Valley Warm Springs Management Plan for Death Valley [[Page 33238...

  17. Assessment of the Effectiveness of Protected Areas Management in Iran: Case Study in Khojir National Park

    Science.gov (United States)

    Kolahi, Mahdi; Sakai, Tetsuro; Moriya, Kazuyuki; Makhdoum, Majid F.; Koyama, Lina

    2013-08-01

    The requirement to assess the management effectiveness (ME) in protected areas (PAs) is increasing around the world to help improve management and accountability. An evaluation of ME for Khojir National Park (KNP), one of the Iran's oldest PAs, was conducted using a multi-method approach that consisted of structured interviews, open interviews, and site visits. This was the first ME evaluation in Iran. The structured interview was based on the management effectiveness tracking tool methodology. KNP received an average score of 43 %, which is lower than the global average, illustrating that its general management was in the low-intermediate level. The indices of legal status, resource inventory, planning for land and water use, regulations, and objectives received the highest average scores, whereas education and awareness, community co-management, regular work plan, boundary demarcation, visitor facilities, budget sources, staff training, protection systems, and management plan received the lowest ones. The management system of KNP was generally established, but many problems of the management still need to be resolved. To improve ME, some countermeasures should be taken, such as increasing funding, strengthening capacity building, planning, and adaptive management, and implementing community participation.

  18. An Intelligent Parking Management System for Urban Areas.

    Science.gov (United States)

    Vera-Gómez, Juan A; Quesada-Arencibia, Alexis; García, Carmelo R; Suárez Moreno, Raúl; Guerra Hernández, Fernando

    2016-06-21

    In this article we describe a low-cost, minimally-intrusive system for the efficient management of parking spaces on both public roads and controlled zones. This system is based on wireless networks of photoelectric sensors that are deployed on the access roads into and out of these areas. The sensors detect the passage of vehicles on these roads and communicate this information to a data centre, thus making it possible to know the number of vehicles in the controlled zone and the occupancy levels in real-time. This information may be communicated to drivers to facilitate their search for a parking space and to authorities so that they may take steps to control traffic when congestion is detected.

  19. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  20. Management národních parků: ochrana stavu versus ochrana procesů

    Czech Academy of Sciences Publication Activity Database

    Härtel, Handrij

    2009-01-01

    Roč. 44, Mat. 24 (2009), s. 25-33 ISSN 1212-3323. [Diverzita, dynamika a management lesní vegetace. Praha, 29.11.2008-30.11.2008] Institutional research plan: CEZ:AV0Z60050516 Keywords : IUCN category * national park * spontaneous processes Subject RIV: EF - Botanics

  1. Integrated Environmental Risk Assessment and Whole-Process Management System in Chemical Industry Parks

    Science.gov (United States)

    Shao, Chaofeng; Yang, Juan; Tian, Xiaogang; Ju, Meiting; Huang, Lei

    2013-01-01

    Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF) using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on. PMID:23603866

  2. Integrated environmental risk assessment and whole-process management system in chemical industry parks.

    Science.gov (United States)

    Shao, Chaofeng; Yang, Juan; Tian, Xiaogang; Ju, Meiting; Huang, Lei

    2013-04-19

    Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF) using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on.

  3. Integrated Environmental Risk Assessment and Whole-Process Management System in Chemical Industry Parks

    Directory of Open Access Journals (Sweden)

    Lei Huang

    2013-04-01

    Full Text Available Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on.

  4. Smart Parking Management Pilot Project: A Bay Area Rapid Transit (BART) District Parking Demonstration

    OpenAIRE

    Shaheen, Susan; Rodier, Caroline; Eaken, Amanda M.

    2005-01-01

    This report presents early findings from an application of advanced parking technologies to maximize existing parking capacity at the Rockridge BART station, which was launched in December 2004 in the East San Francisco Bay Area. The smart parking system includes traffic sensors that count the number of vehicles entering and exiting the parking lots at the station. A reservation system allows travelers to reserve spaces by Internet, personal digital assistant (PDA), phone, and cell phone. The...

  5. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  6. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  7. 77 FR 53908 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-09-04

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMRO-YELL-11188; 2310-0070-422] Winter Use... comment period on the Draft Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan... online at http://parkplanning.nps.gov/YELL (click on the link to the 2012 Supplemental Winter Use Plan...

  8. Study on ecological conservation planning of Xianyue Park in Xiamen City, China

    Science.gov (United States)

    Xu, Naizhong; Xi, Rong; Ren, Tingyan; Zhao, Peng; Chuai, Zeyao

    2017-08-01

    The paper discusses the current situation and existing problems of ecological restoration and tourist infrastructure development of Xiamen Xianyue Park located in Xiamen Island, China. Issues of ecosystem restoration and landscape improvement, restoring habitats, and ecosystem management system are analyzed. Options of further optimization of the tourist-targeted infrastructure are proposed, which take into account the ecological system and landscape pattern optimization, promotion of ecotourism, and implementation of the ecological management system. The particular solution envisages the park zoning with three primary zones (ecological protection, ecological buffer, and general activity zones) and five secondary ones (scenic landscape, ecotourism, religious activity, buildings and structures, and entertainment zones). By integrating the ecological principles into other land use objectives, taking full advantage of the park ecological and cultural heritage, and improving its ecological management, it is expected to provide the ecological restoration of the park under study and optimize its contribution to the regional economic and social development.

  9. Managing contested greenspace: neighborhood commons and the rise of dog parks

    Directory of Open Access Journals (Sweden)

    Daniel Matisoff

    2012-03-01

    Full Text Available Dog parks present an emerging class or urban environmental amenities. In order to develop a better understanding of dog parks, this article applies existing literature regarding urban parks and common pool resource (CPR management to off-leash recreation areas. We develop a typology dog-park management and build upon a survey of 298 dog park users of a major dog park. We test the relationship between the perception of the park as a successfully governed CPR, and behaviour which contributes to collective action, such as contributing time, money, or to the upkeep of the park and developing a sense of community. We see strong relationships between these indicators of overcoming collective action problems and the four variables corresponding to design principles. Across all models, feeling involved in rule-making positively and significantly predicts more collective action or stronger sense of community.

  10. 75 FR 53980 - Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-09-02

    ... March 8, 2010. The Preferred Alternative will make use of skilled public volunteers to assist the Park... DEPARTMENT OF THE INTERIOR National Park Service Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact Statement for Theodore Roosevelt National Park ACTION: Notice...

  11. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  12. Stakeholder e-Participation in Local Planning: The Camargue Park Case

    Science.gov (United States)

    Desquinabo, Nicolas; Ferrand, Nils; Marlier, Julie

    The goal of this study is to evaluate several features and outcomes of the e-consultation organized by the Camargue Natural Park on its management plan. To estimate the benefits of the selected Internet devices, we have compared our assessment of this e-consultation with other face-to-face participative events organized on the same management plan. Following "computer-mediated communication" and deliberative theories, we expected that the tested e-tools would increase the deliberative features of the stakeholder participation. Several economic and organisational benefits were also expected. Our first results confirm the organisational benefits of this e-consultation (information gain, cost of the process, etc.). Several "deliberative" benefits have also been observed (more opinion and thematic diversity without an increase of "flames"). Nevertheless, speech is apparently more concentrated than in face-to-face events, even if many "non-posters" visited the consultation site but did not post because they had "all their comments already included".

  13. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  14. 76 FR 70483 - Environmental Impact Statement and General Management Plan, Paterson Great Falls National...

    Science.gov (United States)

    2011-11-14

    ... planning process and will remain actively involved throughout the development of the plan. Prepared by... the long-term management of Paterson Great Falls NHP early in the process through public meetings and... Impact Statement and General Management Plan, Paterson Great Falls National Historical Park, NJ AGENCY...

  15. Is Managed Wildfire Protecting Yosemite National Park from Drought?

    Science.gov (United States)

    Boisrame, G. F. S.; Thompson, S. E.; Stephens, S.; Collins, B.; Kelly, M.; Tague, N.

    2016-12-01

    Fire suppression in many dry forest types has left a legacy of dense, homogeneous forests. Such landscapes have high water demands and fuel loads, and when burned can result in catastrophically large fires. These characteristics are undesirable in the face of projected warming and drying in the Western US. This project explores the potential of managed wildfire - a forest management strategy in which fires caused by lightning are allowed to burn naturally as long as certain safety parameters are met - to reverse the effects of fire suppression. The Illilouette Creek Basin in Yosemite National Park has experienced 40 years of managed wildfire, reducing forest cover and increasing meadow and shrubland areas. We have collected evidence from field measurements and remote sensing which suggest that managed wildfire increases landscape and hydrologic heterogeneity, and likely improves resilience to disturbances such as fire and drought. Vegetation maps created from aerial photos show an increase in landscape heterogeneity following the introduction of managed wildfire. Soil moisture observations during the drought years of 2013-2016 suggest that transitions from dense forest to shrublands or meadows can increase summer soil moisture. In the winter of 2015-2016, snow depth measurements showed deeper spring snowpacks in burned areas compared to dense forests. Our study provides a unique view of relatively long-term effects of managed wildfire on vegetation change, ecohydrology, and drought resistance. Understanding these effects is increasingly important as the use of managed wildfire becomes more widely accepted, and as the likelihood of both drought and wildfire increases.

  16. The “Forest Fire Project”, National cartographic portal of the Italian Environmental Department: an example of management of cartographic data to support forest fires fighting plans in national parks

    Directory of Open Access Journals (Sweden)

    Petrucci B

    2010-02-01

    Full Text Available The “Forest Fire Project” on the National cartographic portal (http://www.pcn.minambiente.it has been created by the Italian Ministry of Environment Territory and Sea (METS. The project is intended to support forest fire fighting plans in national protected areas as provided for by article 8 of the law November 21th 2000, no. 353 “Framework law on forest fires”. The project brings out the results of previous projects carried out in collaboration with several research institutes. Cartographic information is made available as free and reliable knowledge base in order to facilitate the draw up and implementation of the “Forest Fire Plans”, including the actual activity of forest fire extinction. Map information can be further implemented by various subjects such as researchers, land planning programmers or managers. The National cartographic portal gives the opportunity of overlaying various cartographic information and base maps supporting the “Forest Fire Project”; moreover it is possible to add other layers from other sources, through URL. Adequate “personalised” overlaps - which can be saved on one’s own GIS - allow in depth analysis and deductions aimed at specific objectives of territorial planning and management and in particular of Forest Fire Fighting Plans.

  17. Contradictions and paradoxes on territorial management of public parks system in Salvador, Bahia

    Directory of Open Access Journals (Sweden)

    Angelo Serpa

    2006-12-01

    Full Text Available This article aims at making public parks system municipal strategies and management instruments clear in Salvador, state of Bahia/Brazil, from the analysis of the city Directing Plan of Urban and Environment Development (PDDUA, pointing out the possible contradiction and paradox between the late politics of urban re-qualification and the PDDUA determinations and directives. It analyses the spatial vegetal cover distribution and its “ecologic value” in the municipal territory and the classification of conservation unities in the city as well as the urban re-qualification politics undertaken by the municipal administrations in the two last decades. The analyses of the presented examples show that, in despite of the Directing Plan’s approach of public parks both on environmental way than in the recreation one.The last way as the directive of urban re-qualification politics of these spaces in the city prevails. At the end of the article, it is emphasized the central importance of the physical and symbolic access question and of the spatial distribution of nature public spaces for one deep academic discussion looking for other basis for the municipal territory public parks management from one critical analyses of the ideas of sustainable development and sustainability.

  18. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  19. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  20. Problems and Prospects of Curbside Parking in Lahore: PolicyImplications for Effective Management

    Directory of Open Access Journals (Sweden)

    SALMAN SABIR

    2017-10-01

    Full Text Available Lahore is a fast-growing metropolis experiencing rapid growth in people and vehicle population. This unprecedented growth has led to urban sprawl, dependency on motorized transport, and increased parking space demands throughout the city limits. Off-street parking supply is insufficient and the demand is met mainly by roadside parking with and without any authorization. Parking on the roads and sidewalks has resulted in reduction in traffic capacity, traffic speed variation, accidents and disruption in smooth flow of traffic. Though the government has adopted measures in the past to streamline roadside parking activities, these efforts have proved counter-productive. This paper provides a critical analysis of the existing parking situation in Lahore based on detailed surveys and interviews. It presents an assessment of the functional performance of selected parking sites located at various roads. The findings not only provide significant evidence of the problems caused by haphazard curbside parking but also highlight its prospects if managed properly. The paper argues that absence of by-laws governing curbside parking, weak institutions, and inadequate public transport are the main causes of prevailing parking crisis. It concludes that development of curbside parking regulations in line with urban transport policy is a first step towards managing existing and future curbside parking resources in Lahore.

  1. Problems and Prospects of Curbside Parking in Lahore: Policy Implications for Effective Management

    International Nuclear Information System (INIS)

    Sabir, S.

    2017-01-01

    Lahore is a fast-growing metropolis experiencing rapid growth in people and vehicle population. This unprecedented growth has led to urban sprawl, dependency on motorized transport, and increased parking space demands throughout the city limits. Off-street parking supply is insufficient and the demand is met mainly by roadside parking with and without any authorization. Parking on the roads and sidewalks has resulted in reduction in traffic capacity, traffic speed variation, accidents and disruption in smooth flow of traffic. Though the government has adopted measures in the past to streamline roadside parking activities, these efforts have proved counter-productive. This paper provides a critical analysis of the existing parking situation in Lahore based on detailed surveys and interviews. It presents an assessment of the functional performance of selected parking sites located at various roads. The findings not only provide significant evidence of the problems caused by haphazard curbside parking but also highlight its prospects if managed properly. The paper argues that absence of by-laws governing curbside parking, weak institutions, and inadequate public transport are the main causes of prevailing parking crisis. It concludes that development of curbside parking regulations in line with urban transport policy is a first step towards managing existing and future curbside parking resources in Lahore. (author)

  2. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Science.gov (United States)

    2010-07-01

    ..., environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public... Special Forest Products § 223.218 Consistency with plans, environmental standards, and other management... with applicable land management plans. Each contract, permit, or other authorizing instrument shall...

  3. Fund management plan

    International Nuclear Information System (INIS)

    1983-05-01

    The Nuclear Waste Policy Act of 1982, P.L. 97-425 (the Act), provides for establishment of two separate special funds in the US Treasury, the Interim Storage Fund and the Nuclear Waste Fund (the Funds). The Interim Storage Fund (Sec. 136) is the financing mechanism for the provision of federal interim storage capacity, not to exceed 1900 metric tons, for spent nuclear fuel (SNF) from civilian reactors. Basically, interim storage of SNF is the responsibility of the owners and generators of nuclear wastes. Storage at government facilities will be provided only if the utilities do not have adequate storage capacity. The Nuclear Waste Fund (Sec. 302) is the statutory financing approach for the Department's radioactive waste disposal program. P.L. 97-425 directs utilities to pay a mandatory fee to cover DOE's expected costs for nuclear waste disposal. The Funds are administered by the Department of Energy. This Plan identifies how DOE will implement and manage the Nuclear Waste and Interim Storage Funds

  4. 75 FR 15457 - Notice of Availability of Final Elk Management Plan and Environmental Impact Statement for...

    Science.gov (United States)

    2010-03-29

    ...://parkplanning.nps.gov/THRO ); click on the link to Elk Management Plan/ EIS. You may also obtain a copy of the.... The Park would not pay private contractors or outside individuals to shoot elk. The initial reduction..., by removing approximately 275 elk per year. Following the initial reduction phase, the Park would...

  5. DirectView : management support system for the Strijp-S planning

    NARCIS (Netherlands)

    Arts, H.P.T.; Groot, J.K.H.; Haeff, van S.; Luttikhuis, M.M.A.J.; Wit, de E.H.B.J.M.

    2005-01-01

    Planning a redevelopment project of a 27 hectare industrial area into a high-quality urban living environment means that sufficient information has to be available of consequences of process changes. The management of Park Strijp CV is confronted with this situation. Park Strijp CV is a joint

  6. Public Participation and Environmental management in Mountain National Parks

    Directory of Open Access Journals (Sweden)

    Stéphane Héritier

    2010-05-01

    Full Text Available Public involvement has become a key concept in conservation management worldwide. This paper provides an overview of the situation in four countries where national parks have been established for over a century, and where their creation often involved clearing the land of earlier indigenous settlements. Since the 1970s, public participation has become common practice in park management, even though such participation has taken on a variety of forms. The paper analyses the general trends in public participation in park management practices, participation that most authors consider has contributed to successful governance policies and helped build participative democracy. Analyses at different levels, however, reveal that public participation can also divide stakeholders, making it really difficult for any effective coalition of stakeholders to emerge.L’implication du public est devenue l’un des éléments clé des politiques de conservation dans le monde. Cet article a pour objectif de proposer une analyse générale dans quatre pays ayant établi des parcs nationaux de manière très précoce, souvent en opposition avec les populations locales ou autochtones. Depuis les années 1970, la participation publique est devenue une pratique commune dans la gestion des parcs nationaux, même si elle revêt des réalités très variables. Cet article analyse les tendances générales de la participation (notamment au niveau des dispositifs dans les pratiques de gestion des parcs nationaux, qui sont généralement considérées comme des réussites en termes de pratiques politiques ou de gouvernance et qui sont souvent présentées comme des modes d’élaboration de démocratie délibérative. L’analyse utilisant les différents niveaux scalaires tend à montrer au contraire que les dispositifs de participation publique peuvent aussi fragmenter les parties prenantes et rendre plus difficile la constitution efficace d’une coalition d’acteurs.

  7. An outline of economic impacts of management options for Šumava National Park

    Directory of Open Access Journals (Sweden)

    Ian Dickie

    2014-06-01

    Full Text Available This analysis briefly compares the economic impacts of three potential future management scenarios for Šumava National Park (NP in the Czech Republic: (1 continuation of current management, (2 the adoption of draft Bills that would declassify protected areas and enable developments (e.g. ski lift development within some of the Park ’ s most valuable habitats for wildlife, and (3 the adoption of proposals to expand the wilderness area in the Park ’ s core with associated tourism opportunities. The proposals in the draft Bills have the potential to generate employment through ski lift development, but much of this activity will use imported labour and/or be short-term (e.g. associated with construction work. The financial viability of this development is uncertain for a number of reasons, including: likely requirements to compensate for damage to protected habitats, reduced future snow cover due to climate change, and competition to attract sufficient visitors to use the ski lift. The economic impacts of the adoption of the draft Bills (and, to a lesser extent, of continuing with current management would also include negative effects on current nature tourism activity and on its long-term potential to expand. Currently, and certainly if the proposed plans in the draft Bill are adopted, the value of the NP as an area of wilderness and high-quality ecosystems will be reduced. This would weaken one of its key selling points as a tourism and recreation destination. The opportunity for international branding of the national park based on these ecosystems would be diminished. This damage to ecosystems would go against the views of the 75% of the Czech population who agree that it is important to halt the loss of biodiversity because we have a moral obligation to look after nature. Pro-wilderness development offers an alternative scenario. It would allow economic opportunities to be pursued to promote nature-based tourism at new locations and

  8. Grizzly bears as a filter for human use management in Canadian Rocky Mountain national parks

    Science.gov (United States)

    Derek Petersen

    2000-01-01

    Canadian National Parks within the Rocky Mountains recognize that human use must be managed if the integrity and health of the ecosystems are to be preserved. Parks Canada is being challenged to ensure that these management actions are based on credible scientific principles and understanding. Grizzly bears provide one of only a few ecological tools that can be used to...

  9. Recreation conflict potential and management in the northern/central Black Forest Nature Park

    Science.gov (United States)

    C. Mann; J. D. Absher

    2008-01-01

    This study explores conflict in recreational use of the Black Forest Nature Park (BFNP) by six different nature sports groups as a function of infrastructure, forest management and other users. A multi-step, methodological triangulation conflict model from US recreation management was applied and tested in the Park. Results from two groups, hikers and mountain bikers,...

  10. Comprehensive Planning for Classification and Disposal of Solid Waste at the Industrial Parks regarding Health and Environmental Impacts

    OpenAIRE

    Hashemi, Hassan; Pourzamani, Hamidreza; Rahmani Samani, Bahareh

    2014-01-01

    The aim of this study is the comprehensive planning for integrated management of solid waste at the industrial parks. The share of each industrial group including food, metal, chemical, non-metallic minerals, textile, electrical and electronical, and cellulose industries were 48.2, 14.9, 6.7, 22, 0.9, 0.6, and 6.5 percent, respectively. The results showed that nearly half of total industrial waste produced from the range of biological materials are biodegradable and discharging them without o...

  11. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  12. Water-Quality Data for Selected National Park Units, Southern and Central Arizona and West-Central New Mexico, Water Years 2003 and 2004

    National Research Council Canada - National Science Library

    Brown, James G

    2005-01-01

    In 1992 the National Park Service began a Level 1 Water Quality Data Inventory program to make available to park managers the water-resource information with which to best manage each park and plan for the future...

  13. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  14. Resource management plan for the Oak Ridge Reservation. Volume 30, Oak Ridge National Environmental Research Park natural areas and reference areas--Oak Ridge Reservation environmentally sensitive sites containing special plants, animals, and communities

    Energy Technology Data Exchange (ETDEWEB)

    Pounds, L.R. [Univ. of Tennessee, Knoxville, TN (US); Parr, P.D.; Ryon, M.G. [Oak Ridge National Lab., TN (United States)

    1993-08-01

    Areas on the Oak Ridge Reservation (ORR) that contain rare plant or animal species or are special habitats are protected through National Environmental Research Park Natural Area (NA) or Reference Area (RA) designations. The US Department of Energy`s Oak Ridge National Environmental Research Park program is responsible for identifying species of vascular plants that are endangered, threatened, or rare and, as much as possible, for conserving those areas in which such species grow. This report includes a listing of Research Park NAs and RAs with general habitat descriptions and a computer-generated map with the areas identified. These are the locations of rare plant or animal species or special habitats that are known at this time. As the Reservation continues to be surveyed, it is expected that additional sites will be designated as Research Park NAs or RAs. This document is a component of a larger effort to identify environmentally sensitive areas on ORR. This report identifies the currently known locations of rare plant species, rare animal species, and special biological communities. Floodplains, wetlands (except those in RAs or NAs), and cultural resources are not included in this report.

  15. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    Science.gov (United States)

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  16. Developing formal asset management plans

    Science.gov (United States)

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  17. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  18. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  19. Information needs for natural fire management planning

    Science.gov (United States)

    Parsons, David; Bancroft, Larry; Nichols, Thomas; Stohlgren, Thomas

    1985-01-01

    The development and implementation of an effective natural fire management program require a clear definition of goals and objectives, an ever-expanding information base, and effective program evaluation. Examples are given from Sequoia and Kings Canyon National Parks.

  20. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  1. Land-use planning risk estimates for a chemical industrial park in China - A longitudinal study

    DEFF Research Database (Denmark)

    Hu, Xinsheng; Wu, Zongzhi; Hedlund, Frank Huess

    2018-01-01

    A chemical industrial park (CIP) can centralize the management of companies and facilitate mutual communication between different businesses. Due to these advantages, an increasing number of chemical companies are forced into CIP, especially in developing countries such as China. Thus, the land......-site risk levels are still low and within the acceptable region, the study concludes that the authorities should review carefully and monitor the risk level in case of future development activities around and within the chemical industrial park, e.g. preserving a buffer zone should be considered. For future...

  2. An extension of the Theory of Planned Behavior to predict willingness to pay for the conservation of an urban park.

    Science.gov (United States)

    López-Mosquera, Natalia; García, Teresa; Barrena, Ramo

    2014-03-15

    This paper relates the concept of moral obligation and the components of the Theory of Planned Behavior to determine their influence on the willingness to pay of visitors for park conservation. The sample consists of 190 visitors to an urban Spanish park. The mean willingness to pay estimated was 12.67€ per year. The results also indicated that moral norm was the major factor in predicting behavioral intention, followed by attitudes. The new relations established between the components of the Theory of Planned Behavior show that social norms significantly determine the attitudes, moral norms and perceived behavioral control of individuals. The proportion of explained variance shows that the inclusion of moral norms improves the explanatory power of the original model of the Theory of Planned Behavior (32-40%). Community-based social marketing and local campaigns are the main strategies that should be followed by land managers with the objective of promoting responsible, pro-environmental attitudes as well as a greater willingness to pay for this type of goods. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Defense waste management plan

    International Nuclear Information System (INIS)

    1983-06-01

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  4. Applying adaptive management in resource use in South African National Parks: A case study approach

    Directory of Open Access Journals (Sweden)

    Kelly Scheepers

    2011-05-01

    Conservation implications: There is no blueprint for the development of sustainable resource use systems and resource use is often addressed according to multiple approaches in national parks. However, the SANParks resource use policy provides a necessary set of guiding principles for resource use management across the national park system that allows for monitoring progress.

  5. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  6. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  7. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  8. Social Resilience and Commercial Fishers' Responses to Management Changes in the Great Barrier Reef Marine Park

    Directory of Open Access Journals (Sweden)

    Stephen G. Sutton

    2012-09-01

    Full Text Available Understanding how social resilience influences resource users' responses to policy change is important for ensuring the sustainability of social-ecological systems and resource-dependent communities. We use the conceptualization and operationalization of social resilience proposed by Marshall and Marshall (2007 to investigate how resilience level influenced commercial fishers' perceptions about and adaptation to the 2004 rezoning of the Great Barrier Reef Marine Park. We conducted face-to-face interviews with 114 commercial and charter fishers to measure their social resilience level and their responses and adaptation strategies to the 2004 zoning plan. Fishers with higher resilience were more likely to believe that the zoning plan was necessary, more likely to be supportive of the plan, and more likely to have adapted their fishing business and fishing activity to the plan than were fishers with lower social resilience. High-resilience fishers were also less likely to perceive negative impacts of the plan on their fishing business, less likely to have negative attitudes toward the consultation process used to develop and implement the plan, and less likely to have applied for financial compensation under the structural adjustment program. Results confirm the utility of the social resilience construct for identifying fishers who are likely to be vulnerable to changes, and those who are struggling to cope with change events. We conclude that managing for social resilience in the GBR would aid in the design and implementation of policies that minimize the impacts on resource users and lead to more inclusive and sustainable management, but that further research is necessary to better understand social resilience, how it can be fostered and sustained, and how it can be effectively incorporated into management.

  9. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P S; Fry, M R

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  10. Public management of urban hospitality: a case study of Agua Branca Park, São Paulo city

    Directory of Open Access Journals (Sweden)

    Luciana Carla Sagi

    2008-10-01

    Full Text Available This article is a qualitative study about the public management of Água Branca Park in São Paulo city and its impacts on the hospitality of this area. The research began in 2005 in master's degree in Hospitality at Anhembi Morumbi University and was pursuing independent until 2008. It is examined the three major dimensions of management: administrative and institutional, socio-political and economic-financial. It was possible to see how aspects related to human resources training, political projects of greater magnitude, physical resources, planning systematic and relationships with the various social actors ultimately result in the hospitality that the park offers to its visitors. Água Branca Park is having a good performance in that sense, since the various components of public management appear to be moving towards the park to be an area full of leisure, which includes the 3 D's of Dumazedier (1980: rest, fun and development, minimizing the pressures that affect Sao Paulo metropolis.

  11. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  12. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  13. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  14. Eco-Industrial Parks and Sustainable Spatial Planning: A Possible Contradiction?

    Directory of Open Access Journals (Sweden)

    Elisa Conticelli and Simona Tondelli

    2014-08-01

    Full Text Available The definition and the subsequent development of eco-industrial parks (EIPs have been deeply based on the application of industrial ecology theory, which pays specific attention to metabolic exchanges within industrial processes to address a deep reduction of limited resource consumption and a minimization of waste production in the framework of a sustainable development approach. Despite the EIPs configurations being essentially based on the overall idea of sustainability, the problem of defining their proper location inside the territory and the consequent land use model, to minimize land consumption, have not always been central in the wide range of studies and practices concerning the EIPs. Nevertheless, the specific problem of a drastic reduction of land consumption at the EIP planning stage acquires a crucial role and, therefore, needs to be carefully assessed inside the perspective of sustainable urban development. In this framework, the paper firstly aims at facing the nontrivial relationship between the EIPs’ theorizations and implementations and the reduction of land consumption by referencing specific studies and shared tools, where new developments have been favored despite the conversion and redevelopment of existing industrial parks; secondly, it focus on an Italian case study and its emblematic EIP planning processes, in order to deepen the contradictions between sustainable spatial planning and eco-industrial parks. Finally, some final conclusions will be presented, in order to integrate some main issues concerning the reduction of land consumption inside the more traditional EIP design processes.

  15. Institutional models of Bunaken National Park (BNP management to ensure sustainability of ecological and economic functions

    Directory of Open Access Journals (Sweden)

    Kholil

    2012-09-01

    Full Text Available Bunaken Marine Park is one of the world's most beautiful marine tourism which has a unique coral reefs, turtles and diversity of pelagic fish. Currently Bunaken Marine Park has become an excellent tourist attraction for diving. Since the number of visitors and community activities around the park are continues to increase; there have been severe damages to coral reefs as well as polluting the environment around the marine park. Therefore, the sustainability of economic and social benefits is threatened. To avoid damage to coral reefs and pollutions, it is necessary the institute manager which can ensure the sustainability of he sustainability of the tourism attraction. Interpretative Method Structure Modeling (ISM was chosen to design the institutional model appropriate to the conditions surrounding the object, which is able to manage Bunaken Marine Park as a sustainable tourist attraction.

  16. Developing a Web-Based Parking Management System

    Science.gov (United States)

    2010-05-01

    Visitors constitute an important component of a university business. Given that visitors are typically unfamiliar with university campus layouts, special assistance may be needed to assist them with their parking needs. For example, personal and foll...

  17. The planning and construction of Distributed Energy System in Qingdao Sino-German Eco-park

    Science.gov (United States)

    Wei, Cun; Zhang, Gaijing; Song, Peipei

    2018-04-01

    This paper introduce the development and characteristics of new energy, Eco-city and Distributed Energy System in China, a case study of Qingdao Sino-German Eco-park, research on practical application about planning and construction of Distributed Energy System in Eco-city. Results show that: we must first do a good job in energy planning, giving full play to their own advantages, and Distributed Energy System based renewable energy resources is a promising option for reducing emissions from electricity generation in Eco-city.

  18. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  19. Liquidity management through financial planning

    OpenAIRE

    Kameníková Katarína

    2001-01-01

    One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial pl...

  20. Analysing hiker movement patterns using GPS data: Implications for park management

    NARCIS (Netherlands)

    Meijles, E.; de Bakker, M.; Groote, P.; Barske, R.

    In natural areas, park management organisations need to cater for economic, environmental, recreation and social demands and values. However, multifunctional land use also creates conflicts. Increased numbers of people using an area could exceed its ecological carrying capacity. The recreational

  1. THE ANALYSIS DEVELOPMENT PROGRAM OF CORPORATE SOCIAL RESPONSIBILITY AT NATIONAL PARK MANAGEMENT CIANJUR NATIONAL PARK OF MOUNT GEDE PANGRANGO

    Directory of Open Access Journals (Sweden)

    Tun Susdiyanti

    2017-04-01

    Full Text Available This study aims to analyze the development of Corporate Social Responsibility (CSR programs based on field observations and recommend appropriate strategies in implementing CSR in the National Park Management ( PTN Cianjur Gunung Gede Pangrango National Park. Working methods in this study include the evaluation stage uses a conceptual framework for descriptive analysis and recommendations on technical and drafting stage strategy using SWOT analysis. SWOT analysis, CSR program in Cianjur PTN is aggressive ( points 2.22; 1.74 is a strategic position. Proposed development strategy that can be implemented that increase the public's understanding, increase community participation, the optimization of the use of funds, and improve the performance extension, Polhut, PEH and operators in the implementation of CSR activities.

  2. Parks, people, and change: the importance of multistakeholder engagement in adaptation planning for conserved areas

    Directory of Open Access Journals (Sweden)

    Corrine N. Knapp

    2014-12-01

    Full Text Available Climate change challenges the traditional goals and conservation strategies of protected areas, necessitating adaptation to changing conditions. Denali National Park and Preserve (Denali in south central Alaska, USA, is a vast landscape that is responding to climate change in ways that will impact both ecological resources and local communities. Local observations help to inform understanding of climate change and adaptation planning, but whose knowledge is most important to consider? For this project we interviewed long-term Denali staff, scientists, subsistence community members, bus drivers, and business owners to assess what types of observations each can contribute, how climate change is impacting each, and what they think the National Park Service should do to adapt. The project shows that each type of long-term observer has different types of observations, but that those who depend more directly on natural resources for their livelihoods have more and different observations than those who do not. These findings suggest that engaging multiple groups of stakeholders who interact with the park in distinct ways adds substantially to the information provided by Denali staff and scientists and offers a broader foundation for adaptation planning. It also suggests that traditional protected area paradigms that fail to learn from and foster appropriate engagement of people may be maladaptive in the context of climate change.

  3. An approach for recreation suitability analysis to recreation planning in Gölcük Nature Park.

    Science.gov (United States)

    Gül, Atila; Orücü, M Kamil; Karaca, Oznur

    2006-05-01

    Gölcük Nature Park (GNP) is an area protected by law in Turkey. It is an important nature park with rich flora, fauna, geomorphologic forms, landscape features, and recreational potential in the region. However, GNP does not have a recreation management plan. The purpose of this study was to determine the actual natural, cultural, and visual resources of GNP, determine the most suitable recreational sites with multiple factors, evaluate the demands and tendencies of visitors, and suggest recreational activities and facilities for the most suitable sites of GNP. However, it was also conceived as leading to a recreational plan and design of GNP in the future and identifying the entire appropriate and current data of GNP with the creation of various maps. This study used multifactor analysis to determine the most suitable recreation sites of GNP. Used recreation factors were established including degree of slope, proximity to water resources, accessibility, elevation, vegetation, soil, climate, aspect, current cultural facilities, visual values, and some limiting factors in accordance with the characteristics of GNP. Weighting and suitability values of factors were determined by 30 local expert surveys. All obtained data were evaluated and integrated in the Geographical Information Systems base. Obtained maps were overlapped. Thus, recreational suitability zones map were created manually. However, the demands and behaviours from visitor surveys in GNP were focused on the most suitable recreation sites of the park. Finally, 10% of GNP was identified as the most suitable sites for recreational use. Various recreational facilities and activities (including picnicking, sports facilities and playgrounds, camping sites, walking paths, food and local outlets, etc.) were recommended for nine of the most suitable areas on the proposed recreational map.

  4. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  5. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    Drobny, N.L.

    1986-01-01

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. 14 refs., 13 figs., 9 tabs

  6. Cofrentes NPP Knowledge management plan

    International Nuclear Information System (INIS)

    Pardo Gonzalez, F.

    2016-01-01

    The main objective of the Knowledge Management Plan at Cofrentes Nuclear Power Plant is therefore to establish the steps to be followed for distributing and sharing the existing knowledge at the Plant through collaboration and continuous learning and exchanges with internal and external groups. It is also very important that staff and organisational learning is closely in line with Plant expectations. (Author)

  7. Capacity Planning and Leadtime management

    NARCIS (Netherlands)

    Zijm, Willem H.M.; Buitenhek, R.

    1996-01-01

    In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities

  8. A Distributed Wireless Camera System for the Management of Parking Spaces.

    Science.gov (United States)

    Vítek, Stanislav; Melničuk, Petr

    2017-12-28

    The importance of detection of parking space availability is still growing, particularly in major cities. This paper deals with the design of a distributed wireless camera system for the management of parking spaces, which can determine occupancy of the parking space based on the information from multiple cameras. The proposed system uses small camera modules based on Raspberry Pi Zero and computationally efficient algorithm for the occupancy detection based on the histogram of oriented gradients (HOG) feature descriptor and support vector machine (SVM) classifier. We have included information about the orientation of the vehicle as a supporting feature, which has enabled us to achieve better accuracy. The described solution can deliver occupancy information at the rate of 10 parking spaces per second with more than 90% accuracy in a wide range of conditions. Reliability of the implemented algorithm is evaluated with three different test sets which altogether contain over 700,000 samples of parking spaces.

  9. A Distributed Wireless Camera System for the Management of Parking Spaces

    Directory of Open Access Journals (Sweden)

    Stanislav Vítek

    2017-12-01

    Full Text Available The importance of detection of parking space availability is still growing, particularly in major cities. This paper deals with the design of a distributed wireless camera system for the management of parking spaces, which can determine occupancy of the parking space based on the information from multiple cameras. The proposed system uses small camera modules based on Raspberry Pi Zero and computationally efficient algorithm for the occupancy detection based on the histogram of oriented gradients (HOG feature descriptor and support vector machine (SVM classifier. We have included information about the orientation of the vehicle as a supporting feature, which has enabled us to achieve better accuracy. The described solution can deliver occupancy information at the rate of 10 parking spaces per second with more than 90% accuracy in a wide range of conditions. Reliability of the implemented algorithm is evaluated with three different test sets which altogether contain over 700,000 samples of parking spaces.

  10. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  11. 76 FR 31359 - Notice of Intent To Prepare an Environmental Impact Statement on a General Management Plan...

    Science.gov (United States)

    2011-05-31

    ... management activities, visitor activities, and developments that would be appropriate in the park in the future. In addition, the plan will generally address visitor-use related issues and provide management... Environmental Impact Statement on a General Management Plan Amendment/Wilderness Study for Lake Clark National...

  12. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    Directory of Open Access Journals (Sweden)

    Nick Petrunoff

    Full Text Available After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives.Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis.Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts. Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite.Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take

  13. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    Science.gov (United States)

    Petrunoff, Nick; Rissel, Chris; Wen, Li Ming

    2017-01-01

    After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by

  14. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  15. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  16. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  17. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  18. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  19. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  20. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  1. Project Stakeholder Management: A Case Study of a Brazilian Science Park

    Directory of Open Access Journals (Sweden)

    Antônio Carlos Pacagnella Júnior

    2015-07-01

    Full Text Available The stakeholder management has been a topic increasingly discussed in the literature about project management, though still existing, large gaps to be filled, especially in complex projects such as the implementation of science parks. Thus, in this paper is presented a case of a Brazilian Science Park which shows how the management team of the project identified key stakeholders and established strategies for engagement and collaboration that sought to increase their engagement, get resources and make use of specific capabilities that were required during the lifecycle of the project to the reaching of its goals.

  2. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  3. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  4. Management Cycle: from Planning to Evaluation

    OpenAIRE

    Kova?i?, Luka; Jakši?, Želimir

    2008-01-01

    The planning process in health care known as management cycle or cycle of organization and management is described. The cycle is divided in four main elements: planning, organization, implementation and evaluation. Each element is defined and described.

  5. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  6. Solid Waste and Water Quality Management Models for Sagarmatha National Park and Buffer Zone, Nepal.

    NARCIS (Netherlands)

    Manfredi, Emanuela Chiara; Flury, Bastian; Viviano, Gaetano; Thakuri, Sudeep; Khanal, Sanjay Nath; Jha, Pramod Kumar; Maskey, Ramesh Kumar; Kayastha, Rijan Bhakta; Kafle, Kumud Raj; Bhochhibhoya, Silu; Ghimire, Narayan Prasad; Shrestha, Bharat Babu; Chaudhary, Gyanendra; Giannino, Francesco; Carteni, Fabrizio; Mazzoleni, Stefano; Salerno, Franco

    2010-01-01

    The problem of supporting decision- and policy-makers in managing issues related to solid waste and water quality was addressed within the context of a participatory modeling framework in the Sagarmatha National Park and Buffer Zone in Nepal. We present the main findings of management-oriented

  7. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  8. A case study of resources management planning with multiple objectives and projects

    Science.gov (United States)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  9. Analyzing stakeholder preferences for managing elk and bison at the National Elk Refuge and Grand Teton National Park: An example of the disparate stakeholder management approach

    Science.gov (United States)

    Koontz, Lynne; Hoag, Dana L.

    2005-01-01

    The U.S. Fish and Wildlife Service (FWS) and the National Park Service (NPS) are preparing a management plan for bison and elk inhabiting the National Elk Refuge (NER) and Grand Teton National Park (GTNP) near Jackson Hole, Wyoming. A management plan is needed to evaluate current and possible changes to habitat management, disease management, winter feeding and hunting programs related to the NER and GTNP. In order to make good decisions, managers need to incorporate the opinions and values of the involved stakeholders as well as understand the complex institutional constraints and opportunities that influence the decision making process. Federal, state, local, private and public stakeholders have diverse values and preferences about how to use and manage resources, and underlying institutional factors give certain stakeholders more influence over the outcome. How stakeholders use their influence can greatly affect the time, effort and costs of the decision making process. The overall result will depend both on the stakeholder’s relative power and level of conviction for their preferences.

  10. Institutional Sustainability Barriers of Community Conservation Agreement as a Collaboration Management in Lore Lindu National Park

    Directory of Open Access Journals (Sweden)

    Sudirman Daeng Massiri

    2015-12-01

    Full Text Available The main problem of forest institutional arrangement is the issue of institutional sustainability in achieving sustainable forest ecosystem. This study aimed to explain the barriers of institutional sustainability Community Conservation Agreement (CCA designed in Lore Lindu National Park (LLNP, in Indonesia, as a collaborative management of national parks. This study is of descriptive which used qualitative approach, i.e. asking open-ended questions, reviewing documentation and analyzing textual of community conservation agreements. We found that the institutional sustainability barriers of CCA were the local decisions on collective-choice level and that the rules at operational level arranged in CCA were not in line with formal rules of national park management at the constitutional level. Furthermore, the low capacity of local institutions in heterogeneous villages with many migrants in controlling and regulating the forest use, especially in rehabilitation zone areas, also became a barrier to institutional sustainability of CCA. Therefore, institutional sustainability of CCA requires support of national park management policy that accommodates the sustainability of livelihoods of local communities in national parks, strengthening local institution's capacity, and ultimately integrating institution of CCA as part of LLNP management.

  11. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  12. Planning ideology and geographic thought in the early twentieth century: Charles Whitnall's progressive era park designs for socialist Milwaukee.

    Science.gov (United States)

    Platt, Lorne A

    2010-01-01

    As Milwaukee’s chief park planner in the early to mid-twentieth century, Charles Whitnall responded to the various underlying ideologies of the period within which he worked. His preference for parks was a political and physical response to and remedy for the industrialized and heavily congested city he called home. By examining the Progressive Era discourse associated with planning, this article situates Whitnall’s work within the political, aesthetic, and environmental contexts of geographic thought that influenced his plans for Milwaukee. In promoting a physical awareness associated with the natural features of the region and responding to the sociopolitical framework of contemporaries such as Ebenezer Howard, Whitnall incorporated a sense of compassion within his planning. He responded to the preexisting beer gardens of Pabst and Schlitz, as well as Olmsted-designed park spaces, by advocating for decentralization as part of a broader socialist agenda that had swept through Milwaukee during the early 1900s.

  13. Planning and Nuclear Knowledge Management

    International Nuclear Information System (INIS)

    Grance Torales, V.L.; Lira, L.

    2016-01-01

    Full text: The present case aims to share the experience of the Intellectual Capital Section (ICS), part of Planning, Coordination and Control Department of the Argentine Atomic Energy Commission (CNEA) in its search for a sustainable knowledge management. Among the strategic objectives included in CNEA’s Strategic Plan (SP), is the development, preservation and transference of knowledge and experience. Under this framework, the role initially assumed by the ICS, consisted on the observation and diagnosis of the situation of the Institutional Human Capital (HC), through the study of the main characteristics of the staff of CNEA. The second stage of SP (2015–2025), which consisted of updating the HC data, the incorporation of the concept of “knowledge management” was approved by the authorities of the Institution. Based on this background, in 2016 the objectives of the ICS are aimed at organizing and coordinating a network of knowledge management that involves the entire organization. This new phase implies, among other things, the proposal of a knowledge management policy, interaction with other sectors of CNEA for implementation, analysis of the tools to be used, in order to determine a way and work style that suits the culture and structure of the organization. (author

  14. Liquidity management through financial planning

    Directory of Open Access Journals (Sweden)

    Kameníková Katarína

    2001-12-01

    Full Text Available One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial planning in chosen slovac magnesite firm, exploitating and elaborating magnesite raw material.For creating of financial plann of liquidity I chosed to use one of the practical methods - method of financial indexes. Such method presents process of planning optimal liquidity with providing of required rentability. Such plann must provide balance between income and outcome, as well as secure achievment of expected profit.I used tools of financial planning for calculation of possible liquidity improvement in mentioned firm, where present financial situation is characterised by law liquidity, but high rentability. Such position presents transitive crisis situation, therefore firm must create new financial property or decrease liabilities, in order to overcome negative state of liquidity.Performed calculation showed, that change in balance sheet due to the growth of financial property will improve liquidity, rentability will be maintained, therefore firm will be able to transit from crisis situation.Providing of liquidity will present one of possible way how to care for financial health of firm. But such process is not simple, it must be done with connection to the changes of internal and external conditions of the firm.

  15. Does Pastoralists' Participation in the Management of National Parks in Northern Norway Contribute to Adaptive Governance?

    Directory of Open Access Journals (Sweden)

    Camilla Risvoll

    2014-06-01

    Full Text Available Norwegian protected areas have historically been managed by central, expertise bureaucracy; however, a governance change in 2010 decentralized and delegated the right to manage protected areas to locally elected politicians and elected Sámi representatives in newly established National Park Boards. We explore how this new governance change affects adaptive capacity within the reindeer industry, as the reindeer herders are now participating with other users in decision-making processes related to large tracts of protected areas in which they have pasture access. Aspects within adaptive capacity and resilience thinking are useful as complementary dimensions to a social-ecological system framework (Ostrom 2007 in exploring the dynamics of complex adaptive social-ecological systems. The National Park Board provides a novel example of adaptive governance that can foster resilient livelihoods for various groups of actors that depend on protected areas. Data for this paper were gathered primarily through observation in National Park Board meetings, focus groups, and qualitative interviews with reindeer herders and other key stakeholders. We have identified certain aspects of the national park governance that may serve as sources of resilience and adaptive capacity for the natural system and pastoral people that rely on using these areas. The regional National Park Board is as such a critical mechanism that provides an action arena for participation and conflict resolution. However, desired outcomes such as coproduction of knowledge, social learning, and increased adaptive capacity within reindeer husbandry have not been actualized at this time. The challenge with limited scope of action in the National Park Board and a mismatch between what is important for the herders and what is addressed in the National Park Board become important for the success of this management model.

  16. Model of Ecotourism Management in Small Islands of Bunaken National Park, North Sulawesi

    Directory of Open Access Journals (Sweden)

    Diane Tangian

    2015-05-01

    Full Text Available The Bunaken National Park is one of the famous national park for tourism in North Sulawesi, Indonesia. The abundance natural resources is one of the crucial natural attraction for tourism in Bunaken. Tourism in Bunaken contributes significantly in local economic development. In the same situation, however, tourism contributes negatively to environment. Tourist activities contributes significantly in coral reef covers. Utilization of natural resources as an object and attraction needs to be done carefully, taking into account the balance of ecological, socio-economic and socio-cultural. The concept of ecotourism with three aspects of development were important in aspect in Bunaken National Park tourism development. The management of the park tour needs to be done based on the concept and principles of ecotourism. The Bunaken National Park tourist management model simulated by the dynamic system with the Powersim Constructor software show the number of tourist 2035 reached 27,152.98, extensive coral cover 447.87ha, the local community incomes Rp 15,834,861,419.63 and government revenues Rp 1,751,770,691.04. Keywords: conservation area, ecotourism, powersim model, sustainable management.

  17. Plans for the development of infrastructure and tourism activities in landscape parks under the State Forests’ administration

    OpenAIRE

    Referowska-Chodak, Ewa

    2015-01-01

    The aim of the study was to present plans (up to 2030) for the development of infrastructure and tourism activities in the Polish landscape parks located in the area of the State Forests’ administration. At the end of 2013, a survey was conducted the results of which were verified and their analysis completed in 2014. The questionnaire was sent to the directorates of all 122 parks. 70.5% of the directorates replied to the open question inquiring about their plans and demands for tourist ac...

  18. Monitoring of vegetation response to elk population and habitat management in Rocky Mountain National Park, 2008–14

    Science.gov (United States)

    Zeigenfuss, Linda C.; Johnson, Therese L.

    2015-12-17

    Since 2008, Rocky Mountain National Park in Colorado has been implementing an elk and vegetation management plan with the goal of managing elk populations and their habitats to improve the condition of key vegetation communities on elk winter range. Management actions that have been taken thus far include small reductions in the elk herd through culling of animals and temporary fencing of large areas of willow and aspen habitat to protect them from elk browsing. As part of the park’s elk and vegetation management plan (EVMP), a monitoring program was established to assess effectiveness of management actions in achieving vegetation goals. We collected data to monitor offtake (consumption) of upland herbaceous plants and willow annually from 2008 to 2014 and to assess aspen stand structure and regeneration and willow cover and height in 2013, 5 years after plan implementation. Loss of many willow and a few aspen monitoring sites to a fire in late 2012 complicated data collection and interpretation of results but will provide opportunities to observe habitat recovery following fire and in the presence and absence of elk herbivory, which will offer important insights into the use of prescribed fire as an additional management tool in these habitats.

  19. Designing and Managing a Smart Parking System Using Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Adil Hilmani

    2018-06-01

    Full Text Available For several years, the population of cities has continued to multiply at a rapid pace. The main cause of this phenomenon in developing countries like Morocco is the rural exodus. In fact, rural youth are increasingly attracted by the modern way of life and the opportunities of employment offered by cities. This increase in population density has a large number of negative effects on the quality of life in the city. The most obvious is the intensity of the traffic, which has become an almost insurmountable problem and which causes a great deal of damage, such as the increase in the number of accidents that cause serious bodily harm to the road users, the pollution caused by the large amount of CO2 released by the vehicles, and the continuous stress of drivers who must drive in often narrow and very busy roads and who must look for a long time to find a space to park. Thus, to solve the parking problem, several modern technologies have been created to equip car parks with smart devices that help road users identify the nearest car park that has a free space. These technologies most often use wireless sensor networks and Internet of Things (IoT technology. In this paper, we present the design and development of a smart parking system using the latest technologies based on wireless sensor networks (WSN. Our system uses an adaptable and hybrid self-organization algorithm for wireless sensor networks that adapts to all types of car parks existing in the city (linear and mass parking, and offers a better management of the energy consumption during the wireless communication to increase the lifetime of the sensor nodes and the longevity of the WSN. This system also offers innovative services which facilitate the task to the drivers when looking for an available parking space in the city near their destination, in a fast and efficient manner.

  20. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  1. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  2. Management and Planning for Small Community Wastewater

    Science.gov (United States)

    Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management Agencies, The Office of Wastewater Management at EPA, in cooperation with the Global Environment and

  3. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  4. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  5. Present condition and theme of the planning standards of parks and open space planning. Koen ryokuchi keikaku gijutsu hyojun no genjo to kadai

    Energy Technology Data Exchange (ETDEWEB)

    Takanashi, M. (Kanagawa Prefectural Government, Kanagawa (Japan))

    1992-08-06

    With the dramatic progress of urbanization, the rapid decrease of the green area and the open space, which is basis for ensuring the safety and the comfort of city life and formation of a good city environment, lead to the worsen of city environment. For the basic purpose of achieving the harmony between development and environment by considering the preservation of the green area and the open space, the green master plan is a representative example, and was made as the constitution of from a ground plan to the various plans such as region, city and nation based on the space unit of developing the human action. One of the important planning approach for the green area plan from conception to implementation is the planning standards of park and open space planning. This paper introduced the change of the system about the planning standards of park and open space planning, and explained necessarily the present state of greens master plan about preservation of the national environment and adjustment the park and open space. 1tab.

  6. Community Participation Of Coastal Area On Management Of National Park, Karimunjawa Island

    Science.gov (United States)

    Wibowo, Bambang A.; Aditomo, Aryo B.; Prihantoko, Kukuh E.

    2018-02-01

    Karimunjawa island located in Jepara Regacy, Central Java has potential marine and fishing resources. Since 1998, this area has been selected as conservation for its natural resources. National park of Karimunjawa is managed by Balai Taman Nasional Karimunjawa (Karimunjawa National Park Beuroue). Some activities involved community have been done in order to get effective management. Community participation is an important component for success in coastal area management. The level of community/people awareness anual on natural resource conservation can increate sustainable resource. However, it is necesssary to provide tools in resource utilization for the community, so that their economic life can be secured. This study observe the level of community participation in the effort of Karimunjawa National Park management. Descriptive method and purposive random sampling were used to carry out the study parameters observed in this study include community participation related to level of knowladge and obedience on the rule of area zonation, an its impact to community. The result show that community knowledge was quite high (40%) with obedience (56%) on the rule of area zonation. Impact area zonation rule was less significant to community. The level of community participation to Karimunjawa National Park management was performed will low to medium level.

  7. Cross-boundary management between national parks and surrounding lands: A review and discussion

    Science.gov (United States)

    Schonewald-Cox, Christine; Buechner, Marybeth; Sauvajot, Raymond; Wilcox, Bruce A.

    1992-03-01

    Protecting biodiversity on public lands is difficult, requiring the management of a complex array of factors. This is especially true when the ecosystems in question are affected by, or extend onto, lands outside the boundaries of the protected area. In this article we review recent developments in the cross-boundary management of protected natural resources, such as parks, wildlife reserves, and designated wilderness areas. Five ecological and 11 anthropic techniques have been suggested for use in cross-boundary management. The categories are not mutually exclusive, but each is a distinct and representative approach, suggested by various authors from academic, managerial, and legal professions. The ecological strategies stress the collection of basic data and documentation of trends. The anthropic techniques stress the usefulness of cooperative guidelines and the need to develop a local constituency which supports park goals. However, the situation is complex and the needed strategies are often difficult to implement. Diverse park resources are influenced by events in surrounding lands. The complexity and variability of sources, the ecological systems under protection, and the uncertainty of the effects combine to produce situations for which there are no simple answers. The solution to coexistence of the park and surrounding land depends upon creative techniques and recommendations, many still forthcoming. Ecological, sociological, legal, and economic disciplines as well as the managing agency should all contribute to these recommendations. Platforms for change include legislation, institutional policies, communication, education, management techniques, and ethics.

  8. Planning and Construction of Gupanshan Urban Forest Park in Pingyang County%平阳县古盘山城市森林公园规划与建设

    Institute of Scientific and Technical Information of China (English)

    陈庆虎; 杨笑一

    2014-01-01

    The environmental background of the current urban forest park construction is described briefly ,and the importance of Gu-pan mountain urban forest Park in the socio-economic development and ecological environment construction of Pingyang is ana -lyzed.The scientific planning and the construction management methods of the urban forest park are researched from the aspects of ecological landscape ,cultural heritage ,industrial development and etc ,based on the full investigation of the general situation of the park and combined with the construction advantages and the existing problems of the park .the methods to guarantee the proceeding of the construction planning and management of Gupan mountain urban forest park are proposed .%对古盘山城市森林公园概况及现状进行调研,结合公园建设优势条件和存在问题,从生态景观、文化传承、产业发展等层面探索古盘山城市森林公园科学规划与建设管理理念,提出古盘山城市森林公园规划建设与管理顺利推进的保障措施。

  9. The sources, impact and management of car park runoff pollution: a review.

    Science.gov (United States)

    Revitt, D Michael; Lundy, Lian; Coulon, Frédéric; Fairley, Martin

    2014-12-15

    Traffic emissions contribute significantly to the build-up of diffuse pollution loads on urban surfaces with their subsequent mobilisation and direct discharge posing problems for receiving water quality. This review focuses on the impact and mitigation of solids, metals, nutrients and organic pollutants in the runoff deriving from car parks. Variabilities in the discharged pollutant levels and in the potentials for pollutant mitigation complicate an impact assessment of car park runoff. The different available stormwater best management practices and proprietary devices are reported to be capable of reductions of between 20% and almost 100% for both suspended solids and a range of metals. This review contributes to prioritising the treatment options which can achieve the appropriate pollutant reductions whilst conforming to the site requirements of a typical car park. By applying different treatment scenarios to the runoff from a hypothetical car park, it is shown that optimal performance, in terms of ecological benefits for the receiving water, can be achieved using a treatment train incorporating permeable paving and bioretention systems. The review identifies existing research gaps and emphasises the pertinent management practices as well as design issues which are relevant to the mitigation of car park pollution. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. One park, many experiences: socially-explicit improvements to recreation management frameworks with application to Taiwan

    Science.gov (United States)

    James D. Absher

    2010-01-01

    Park management frameworks developed in the US (e.g., VERP, etc.) are being applied in other countries, notably Taiwan. The social forces that drive visitor experiences and how they are reflected in practice are very important in these new contexts. The diversity of meanings, types of experiences desired or expected, and the ways to gauge "success"...

  11. A Career with Meaning: Recreation, Parks, Sport Management, Hospitality, and Tourism

    Science.gov (United States)

    Stevens, Cheryl A.; Murphy, James F.; Allen, Lawrence R.; Sheffield, Emilyn A.

    2010-01-01

    "A Career with Meaning" is a tailor made journey that enables individuals to match their core beliefs and values with numerous professional opportunities within the leisure industry. Leading experts provide detailed discussion and insight for 11 primary areas related to recreation, parks, sport management, hospitality and tourism. Once you have…

  12. Constrained capacity management and cost minimisation of EV-charging in a parking garage

    NARCIS (Netherlands)

    Kamphuis, I.G.; Macdougall, P.; Veen, W. van der; Bakker, E.; Velde, J. van de

    2013-01-01

    Apart from the optimal real-time electricity price to buy the electricity, the optimal, time dependent, capacity contracted with the DSO is of crucial importance for concerted charging of electric vehicles in a parking garage. The battery management system, on its turn, imposes constraints on the

  13. Gateways as a means of visitor management in national parks and protected areas

    NARCIS (Netherlands)

    Beunen, R.; Regnerus, H.D.; Jaarsma, C.F.

    2008-01-01

    Managers of national parks and other protected areas need to balance visitor needs with conservation objectives. In Western Europe, these areas are often part of a "living landscape" where people live and work and where the area roads are used not only by visitors but also by utilitarian local bound

  14. Watershed restoration, jobs-in-the woods, and community assistance: Redwood National Park and the Northwest Forest Plan.

    Science.gov (United States)

    Christopher E. DeForest

    1999-01-01

    There are many parallels between the 1978 legislation to expand Redwood National Park and the Northwest Forest Plan, which together with the Northwest Economic Adjustment Initiative formed the 1993 Pacific Northwest Initiative. In both situations, the Federal Government sought to promote retraining for displaced workers, to undertake watershed assessment and...

  15. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  16. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  17. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  18. Oak Ridge Reservation Waste Management Plan

    International Nuclear Information System (INIS)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year

  19. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  20. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  1. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  2. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  3. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  4. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  5. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  6. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  7. Parks & benefits

    DEFF Research Database (Denmark)

    Brandt, Jesper; Christensen, Andreas Aagaard; Holmes, Esbern

    2011-01-01

    conservation. Increasing visitor flows and cuts in staff resources has put focus on the management of visitor carrying capacities and their relation to landscape structure and zoning. At the same time park authorities face falling public appropriations and receding focus on their conservation functions...... compared to recreation and settlement. The constant priority of the balancing of nature protection and economic utilization gives rise to various experience with land use and visitor management relevant for sustainable development also outside the parks. In European nature parks the handling of visitor...... carrying capacities related to Natura2000-sites and their included habitat type areas is a priority theme for the sustainable management of nature parks. A comparative analysis of conditions and initiatives related to visitor carrying capacities in 8 nature parks in the Baltic region has been carried out...

  8. Nurse manager succession planning: a concept analysis.

    Science.gov (United States)

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  9. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    Drobny, N.L.

    1986-01-01

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. What is low-level radioactive waste? Low-level radioactive waste results from the use of radioactive materials in the treatment of disease, the production of consumer goods and industrial products, and from the generation of electricity at nuclear power plants. Low-level wastes, which are a responsibility of the states, are grouped into three classes, A, B, and C; this classification scheme is prescribed by Federal Regulations and represents different degrees of hazard associated with different concentrations of radioactive materials. Class A wastes are the least hazardous. Classes B and C represent higher hazard classes. 14 refs., 13 figs., 9 tabs

  10. Sustainable landscape management in Tara National Park (Village Jagoštica, Serbia

    Directory of Open Access Journals (Sweden)

    Blagojević Ivana

    2012-01-01

    Full Text Available According to the Nature Protection Act of the Republic of Serbia, national park is defined as a large area with natural ecosystems of high value, in terms of conservation, complexity of structures, biogeographical features, cultural-historical values, and flora and fauna wealth. Owing to their exceptional natural integrity, national park is the treasure of great national importance. Villages (hamlets are integral parts of national park, but are sadly on the verge of disappearing, due to lack of inhabitants. The locals that choose to stay, by fighting for their village's survival and existence, are coming into a conflict with the management board of the national park (mainly directed towards the protection and preservation of biodiversity resources. The research presented here focused on Jagoštica village, located in the far northwestern part of Tara National Park, Serbia. According to the landscape reading, mapped land­scape (spatial elements and social survey, the researched aim was the development of a unique model for sustainable development, focused at protecting diversity of flora and fauna, as well as improving the living standards of local people. Rural tourism and production of local traditional products were found to be the most optimal strategies for moderating the development of this area.

  11. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  12. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  13. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  14. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  15. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  16. Hazardous and Industrial Wastes Management: a Case Study of Khazra Industrial Park, Kerman

    Directory of Open Access Journals (Sweden)

    Hossein Jafari Mansoorian

    2013-08-01

    Full Text Available Background & Aims of the Study: Increasing hazardous industrial wastes and lack of necessary regulations for management of them have led to serious problems in some parts of Iran. The aim of this study was to evaluate the situation of collection, transportation, recycling, and disposal of hazardous industrial wastes in the Khazra Industrial Park of Kerman, Iran. Materials & Methods: This study was a descriptive cross-sectional study that was done using questionnaires and local visits during year 2009. In this questionnaire, some information about the industrial wastes, production, storage on site , collection, transformation, sorting, recycling, and disposal were recorded. Results:   In the Khazra Industrial Park, 71,600 kg/day of different industrial waste is produced. The biggest proportion of waste includes metals, and construction and demolition waste which are about 16,500 tons a year. The smallest proportion is non-iron metal waste, which is produced at a rate of 8 tons per year. 88.7 percent of the active industries at the Khazra Industrial Park produce solid industrial waste. Most of the industrial units do not use a united and coordinated system for storing waste and have no specific place for temporary storage inside the industrial park. The majority of industrial waste collection, which is about 59.8%, is done by private contractors. The industrial units transfer their waste separately, and just 9 industrial units recycle their waste. Disposal of these wastes is mainly done by selling to trading agencies. Each day, 3 tons of hazardous industrial waste is produced in this park. The highest production belongs to the oil factory (Keyhan Motor. Conclusions: According to the results, the Khazra Industrial Park needs a unified system for storing, transporting and collecting the sorted waste, and it also needs to have a transportation station with basic facilities. The wastes of most industrial units at the Khazra Industrial Park have the

  17. Knowledge management of eco-industrial park for efficient energy utilization through ontology-based approach

    International Nuclear Information System (INIS)

    Zhang, Chuan; Romagnoli, Alessandro; Zhou, Li; Kraft, Markus

    2017-01-01

    Highlights: •An intelligent energy management system for Eco-Industrial Park (EIP) is proposed. •An explicit domain ontology for EIP energy management is designed. •Ontology-based approach can increase knowledge interoperability within EIP. •Ontology-based approach can allow self-optimization without human intervention in EIP. •The proposed system harbours huge potential in the future scenario of Internet of Things. -- Abstract: An ontology-based approach for Eco-Industrial Park (EIP) knowledge management is proposed in this paper. The designed ontology in this study is formalized conceptualization of EIP. Based on such an ontological representation, a Knowledge-Based System (KBS) for EIP energy management named J-Park Simulator (JPS) is developed. By applying JPS to the solution of EIP waste heat utilization problem, the results of this study show that ontology is a powerful tool for knowledge management of complex systems such as EIP. The ontology-based approach can increase knowledge interoperability between different companies in EIP. The ontology-based approach can also allow intelligent decision making by using disparate data from remote databases, which implies the possibility of self-optimization without human intervention scenario of Internet of Things (IoT). It is shown through this study that KBS can bridge the communication gaps between different companies in EIP, sequentially more potential Industrial Symbiosis (IS) links can be established to improve the overall energy efficiency of the whole EIP.

  18. Sustainable Management of Subterranean Termite Populations (Isoptera: Rhinotermitidae) in Armstrong Park, New Orleans, With Durable Baits.

    Science.gov (United States)

    Su, Nan-Yao; Guidry, Eric; Cottone, Carrie

    2016-03-27

    Durable baits, Recruit HD, were installed in 45 Sentricon stations between September 2010 and July 2014 in the 32-acre Armstrong Park, New Orleans. After eliminating all detectable termite colonies in the Park, 6-12 mo elapsed before new activity was detected. Newly invading termite colonies were usually found near the Park border or were smaller colonies that originated from recently paired alates. After colony elimination, Recruit HD baits were left in the stations to intercept newly invading colonies of subterranean termites, leading to their elimination, and multiple cycles of such interception and elimination events were recorded. Because the presence of Recruit HD baits continues to eliminate incoming colonies with little effort in maintaining and resupplying baits in the target areas, the bait system offers an economically sustainable option for managing subterranean termite populations in a large area. The 32-acre Armstrong Park is a manageable size to carry out an area-wide (AW) project. If the number of such AW projects is gradually increased over time in selected metro areas of New Orleans, we predict that we may be able to turn the tide against the ever-increasing populations ofC. formosanusin the entire city. © The Authors 2016. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  19. Title 16 united states code §55 and its implications for management of concession facilities in Yosemite National Park

    Science.gov (United States)

    Lemons, John

    1987-08-01

    Yosemite National Park is one of the nation's most scenic and ecologically/geologically important parks. Unfortunately, the park is subject to extensive development of concession facilities and associated high levels of visitor use. Those concerned with preservation of the park's resources have attempted to limit the types and extent of such facilities to reduce adverse impacts. Strictly speaking, resolution of the preservation versus use controversy must be based on whether the National Park Service is adhering to its legislative mandate to regulate development and use in the parks. The common interpretation of legislative mandates for national parks, including Yosemite, is that they call for a difficult balancing between the conflicting goals of preservation and use. Accordingly, although concession developments cause significant impacts, they usually have been interpreted to be within the legal discretion allowed the secretary of the interior. However, the usual interpretations of the meanings of legislative mandates for Yosemite National Park have not considered Title 16 United States Code §55, which is a very restrictive statute limiting concession facilities. Many of the limitations imposed on concession facilities by the plain language of the statute have been exceeded. If it can be shown that 16 United States Code §55 is a valid statute, the policy implications for park management in Yosemite National Park would be considerable — namely, that significant reductions in concession facilities could be required. This article examines whether the statute can reasonably be thought to be valid and encourages others to conduct further examination of this question.

  20. Parking problems in Abu Dhabi, UAE toward an intelligent parking management system “ADIP: Abu Dhabi Intelligent Parking”

    OpenAIRE

    Alkheder, Sharaf A.; Al Rajab, Murad M.; Alzoubi, Khalid

    2016-01-01

    Car parking is a serious problem in Gulf Cooperation Council (GCC) countries in general and in United Arab Emirates (UAE) in particular. This problem has been associated with the exceptional growth in the number of cars, buses, trucks, and other modes of transportation over the past few decades. In Abu Dhabi (the capital city of UAE), finding a parking at some locations is a real challenge due to the lack of available parking slots in the city. In 2009, in order to organize the randomness in ...

  1. Sport Facility Planning and Management. Sport Management Library.

    Science.gov (United States)

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  2. Comprehensive Planning for Classification and Disposal of Solid Waste at the Industrial Parks regarding Health and Environmental Impacts

    Directory of Open Access Journals (Sweden)

    Hassan Hashemi

    2014-01-01

    Full Text Available The aim of this study is the comprehensive planning for integrated management of solid waste at the industrial parks. The share of each industrial group including food, metal, chemical, non-metallic minerals, textile, electrical and electronical, and cellulose industries were 48.2, 14.9, 6.7, 22, 0.9, 0.6, and 6.5 percent, respectively. The results showed that nearly half of total industrial waste produced from the range of biological materials are biodegradable and discharging them without observing environmental regulations leads to short-term pollution and nuisance in the acceptor environment. Also some parts of case study waste were recyclable which is considerable from viewpoint of economical and environmental pollution. Long-term impacts will appear due to improper site selection of disposal from the spatial standpoint. In this way, an approach for site selection using several socioeconomic, physical, and environmental criteria based on multicriteria decision making model (MCDM is introduced. Health risks and environment pollution such as soil and surface water may be done. It is essential to revise the studied industries layout, particularly those units which produce special waste which should be more cautious. Also stricter enforcement is required as an effective step in reducing the harmful impacts of it.

  3. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  4. The United Kingdom's School Asset Management Plans.

    Science.gov (United States)

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  5. 40 CFR 763.93 - Management plans.

    Science.gov (United States)

    2010-07-01

    ... implementation in a timely fashion. (d) Each local education agency shall maintain and update its management plan... surveillance and training. (12) With respect to each consultant who contributed to the management plan, the name of the consultant and one of the following statements: (i) If the State has adopted a contractor...

  6. Evaluating risk management strategies in resource planning

    International Nuclear Information System (INIS)

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  7. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  8. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  9. Mobile Restaurant Information System Integrating Reservation Navigating and Parking Management

    OpenAIRE

    Chih-Yao Lo,; Chun-Ta Lin,; Chia-Lung Tsai

    2011-01-01

    In recent years, with the pace of technological development, people have become more and more demanding in terms of quality of life. At the same time the restaurant industry has become one of the largest industries in the world. To follow international trends and development in the restaurant business in Taiwan, various types of theme restaurants and cafes have emerged. Needless to saycompetition is intense. In such an environment, raising service quality and management performance are the fo...

  10. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  11. Life cycle assessment of integrated waste management systems for alternative legacy scenarios of the London Olympic Park

    Energy Technology Data Exchange (ETDEWEB)

    Parkes, Olga, E-mail: o.parkes@ucl.ac.uk; Lettieri, Paola, E-mail: p.lettieri@ucl.ac.uk; Bogle, I. David L.

    2015-06-15

    Highlights: • Application of LCA in planning integrated waste management systems. • Environmental valuation of 3 legacy scenarios for the Olympic Park. • Hot-spot analysis highlights the importance of energy and materials recovery. • Most environmental savings are achieved through materials recycling. • Sensitivity analysis shows importance of waste composition and recycling rates. - Abstract: This paper presents the results of the life cycle assessment (LCA) of 10 integrated waste management systems (IWMSs) for 3 potential post-event site design scenarios of the London Olympic Park. The aim of the LCA study is to evaluate direct and indirect emissions resulting from various treatment options of municipal solid waste (MSW) annually generated on site together with avoided emissions resulting from energy, materials and nutrients recovery. IWMSs are modelled using GaBi v6.0 Product Sustainability software and results are presented based on the CML (v.Nov-10) characterisation method. The results show that IWMSs with advanced thermal treatment (ATT) and incineration with energy recovery have the lowest Global Warming Potential (GWP) than IWMSs where landfill is the primary waste treatment process. This is due to higher direct emissions and lower avoided emissions from the landfill process compared to the emissions from the thermal treatment processes. LCA results demonstrate that significant environmental savings are achieved through substitution of virgin materials with recycled ones. The results of the sensitivity analysis carried out for IWMS 1 shows that increasing recycling rate by 5%, 10% and 15% compared to the baseline scenario can reduce GWP by 8%, 17% and 25% respectively. Sensitivity analysis also shows how changes in waste composition affect the overall result of the system. The outcomes of such assessments provide decision-makers with fundamental information regarding the environmental impacts of different waste treatment options necessary for

  12. Urban parks as green walls or green magnets? Interracial relations in neighborhood boundary parks

    Science.gov (United States)

    Paul H. Gobster

    1998-01-01

    A recent paper in this journal (Solecki and Welch, 1995) describes how urban parks that lie between racially different neighborhoods can become "green walls" or barriers to use and appreciation. Although this phenomenon is well grounded in the experience of many who plan for, manage, and live near parks in racially and ethnically segregated cities, an...

  13. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  14. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    OpenAIRE

    Nataliya Melnichuk

    2015-01-01

    The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy...

  15. Play for All Guidelines: Planning, Design and Management of Outdoor Play Settings for All Children. Second Edition.

    Science.gov (United States)

    Moore, Robin C., Ed.; Goltsman, Susan M., Ed.; Iacofano, Daniel S., Ed.

    These guidelines assist professional designers, park and recreation managers, and community groups when making decisions about the planning, design, and ongoing management of children's public play environments. The guidelines are updated to meet or exceed the requirements of the Americans with Disabilities Act Guidelines (July 26, 1991) and the…

  16. Grizzly bear management in Yellowstone National Park: The heart of recovery in the Yellowstone Ecosystem

    Science.gov (United States)

    Schwartz, C.C.; Gunther, K.; McCullough, Dale R.; Kaji, Koichi; Yamanaka, Masami

    2006-01-01

    Grizzly bear (Ursus arctos) management in the Greater Yellowstone Ecosystem (GYE) in the past quarter century has resulted in more than doubling of the population from around 200 to more than 500, expansion of range back into habitats where the bear has extirpated more than a century ago, and a move toward removal from the U.S. Endangered Species list. At the center of this success story are the management programs in Yellowstone National Park (YNP). Regulations that restrict human activity, camping, and food storage, elimination of human food and garbage as attractants, and ranger attendance of roadside bears have all resulted in the population of grizzlies in YNP approaching carrying capacity. Recent studies suggest, however, that YNP alone is too small to support the current population, making management beyond the park boundary important and necessary to the demographics of the population as a whole. Demographic analyses suggest a source-sink dynamic exists within the GYE, with YNP and lands outside the park within the Grizzly Bear Recovery Zone (RZ) representing source habitats, whereas lands beyond the RZ constitute sinks. The source-sink demography in the GYE is indicative of carnivore conservation issues worldwide where many national parks or preserves designed to protect out natural resources are inadequate in size or shape to provide all necessary life history requirements for these wide-ranging species. Additionally, wide-ranging behavior and long-distance dispersal seem inherent to large carnivores, so mortality around the edges is virtually inevitable, and conservation in the GYE is inextricably linked to management regimes not only within YNP, but within the GYE as a whole. We discuss those needs here.

  17. The Modern Management of Urban Planning and the Controlling Planning

    Institute of Scientific and Technical Information of China (English)

    1991-01-01

    <正> Since 1980s,with the further reform of political and economic systems,the urban construc-tion in our country has undergone great changes,greater than ever.Such changes pose a series ofnew problems to urban planning:How should planning be suitable for the development of moderncities?How should planning management coordinate with urban planning?How to carry out ur-ban planning under new situations? etc.The answers to these problems lie in one point:urbanplanning and plann ing management must be restructured.Only when the former is well com-bined with the latter can the above problems be solved satisfactorily.This article provides someviews in this respect.

  18. On eco-planning for an eco-demonstration park (EDP) and sustainability-Case study of the Luhua EDP in the Chongming Island of Shanghai,China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The background,concept,connotation,principles,and methods ofeco-planning for an Eco-Demonstration Park (EDP) and sustainability were examined based on a case study of the Luhua EDP in the Chongming Island of Shanghai,China,which is an important part of Shanghai Eco-city planning and construction in the 21st century.By analyzing natural,social and economic conditions,calculating population using the land capacity eco-model,eco-function zoning,and eco-construction,an innovative eco-industrial structure and technical chain were formulated.A comprehensive eco-planning scheme for the EDP was proposed,including planning and management strategies for subsystems of efficient industry,good quality human settlement,high standard eco-construction and eco-tourism as well as effective environmental protection and attractive landscape.The EDP should be an area with coordinated and sustainable economic,social and environmental subsystems.Eco-planning for the EDP should be a very important part of eco-city planning and sustainability.The paper aims to set up a theoretical framework and practical basis for eco-planning and promoting harmony between human and nature.

  19. Governance Challenges in Joint Inter-Jurisdictional Management: The Grand Teton National Park, Wyoming, Elk Case

    Science.gov (United States)

    Clark, Susan G.; Vernon, Marian E.

    2015-08-01

    The controversial elk reduction program (elk hunt) in Grand Teton National Park, WY, has been a source of conflict since it was legislated in 1950. The hunt is jointly managed by the National Park Service and the Wyoming Game and Fish Department. This forced organizational partnership and the conflicting mandates of these two agencies have led to persistent conflict that seems irresolvable under the current decision-making process. To better understand the decision-making process and participant perspectives, we reviewed management documents, technical literature, and newspaper articles, and interviewed 35 key participants in this case. We used these data to analyze and appraise the adequacy of the decision-making process for the park elk hunt and to ask whether it reflects the common interest. We found deficiencies in all functions of the decision-making process. Neither the decisions made nor the process itself include diverse perspectives, nor do they attend to valid and appropriate participant concerns. Agency officials focus their attention on technical rather than procedural concerns, which largely obfuscates the underlying tension in the joint inter-jurisdictional management arrangement and ultimately contributes to the hunt's annual implementation to the detriment of the common interest. We offer specific yet widely applicable recommendations to better approximate an inclusive and democratic decision-making process that serves the community's common interests.

  20. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  1. Elephant population growth in Kruger National Park, South Africa, under a landscape management approach

    Directory of Open Access Journals (Sweden)

    Sam M. Ferreira

    2017-08-01

    Full Text Available South African National Parks (SANParks manage landscapes rather than numbers of elephants (Loxodonta africana to mitigate the effects that elephants may have on biodiversity, tourism and stakeholder conservation values associated with protected areas. This management philosophy imposes spatial variability of critical resources on elephants. Restoration of such ecological processes through less intensive management predicts a reduction in population growth rates from the eras of intensive management. We collated aerial survey data since 1995 and conducted an aerial total count using a helicopter observation platform during 2015. A minimum of 17 086 elephants were resident in the Kruger National Park (KNP in 2015, growing at 4.2% per annum over the last generation of elephants (i.e. 12 years, compared to 6.5% annual population growth noted during the intensive management era ending in 1994. This may come from responses of elephants to density and environmental factors manifested through reduced birth rates and increased mortality rates. Authorities should continue to evaluate the demographic responses of elephants to landscape scale interventions directed at restoring the limitation of spatial variance in resource distribution on elephant spatiotemporal dynamics and the consequences that may have for other conservation values. Conservation implications: Conservation managers should continue with surveying elephants in a way that allows the extraction of key variables. Such variables should focus on measures that reflect on how theory predicts elephants should respond to management interventions.

  2. Its System to Manage Parking Supply: Considerations on Application to the “Ring” in the City of Brescia

    Directory of Open Access Journals (Sweden)

    Susanna Bulferetti

    2014-05-01

    Full Text Available Brescia’s downtown is outlined by link roads built up at the Venetian walls, known as “Ring. The “Ring” is characterized by high traffic flows, as well as by the presence of several paid parking lots located on and off street. Furthermore, several facilities are located on these link roads. Nowadays city of Brescia is equipped with an ITS system able to manage off street parking spaces, allowing the share of information about parking availability to potential users, through the use of variable message panels. The parking supply issue and its management are strongly felt by citizens, as well as many other cities communities, whether European or not. This contribution aims to encourage an integration of the existing ITS system for the off street parking management with additional devices, which allow to manage also the on street paid parking supply located on “Ring” roads. The minimization of so-called “shared traffic” component of traffic flows, as well as the increase of road safety, in the context of a medium-sized Italian city are the main objectives of the ITS system integration. ITS asset chosen for the Brescia case study springs from the analysis of some non-European experiences about on street parking management (for example, San Francisco and Boston and certainly can be considered suitable for the parking supply management of the whole city. It could become the main starting point in Italian cities for the application of performance based parking pricing, widely experienced in many U.S. cities.

  3. The Spatiotemporal Trend of City Parks in Mainland China between 1981 and 2014: Implications for the Promotion of Leisure Time Physical Activity and Planning

    Directory of Open Access Journals (Sweden)

    Kai Wang

    2017-09-01

    Full Text Available City parks, important environments built for physical activity, play critical roles in preventing chronic diseases and promoting public health. We used five commonly used park indicators to investigate the spatiotemporal trend of city parks in mainland China between 1981 and 2014 at three scales: national, provincial and city class. City parks in China increased significantly with a turning point occurring around the year 2000. Up until the end of 2014, there were 13,074 city parks totaling 367,962 ha with 0.29 parks per 10,000 residents, 8.26 m2 of park per capita and 2.00% of parkland as a percentage of urban area. However, there is still a large gap compared to the established American and Japanese city park systems, and only 5.4% of people aged above 20 access city parks for physical activity. The low number of parks per 10,000 residents brings up the issue of the accessibility to physical activity areas that public parks provide. The concern of spatial disparity, also apparent for all five city park indicators, differed strongly at provincial and city class scales. The southern and eastern coastal provinces of Guangdong, Fujian, Zhejiang and Shandong have abundant city park resources. At the scale of the city classes, mega-city II had the highest of the three ratio indicators and the large city class had the lowest. On one hand, the leading province Guangdong and its mega-cities Shenzhen and Dongguan had park indicators comparable to the United States and Japan. On the other hand, there were still five cities with no city parks and many cities with extremely low park indicators. In China, few cities have realized the importance of city parks for the promotion of leisure time physical activity. It is urgent that state and city park laws or guidelines are passed that can serve as baselines for planning a park system and determining a minimum standard for city parks with free, accessible and safe physical activity areas and sports facilities.

  4. The Spatiotemporal Trend of City Parks in Mainland China between 1981 and 2014: Implications for the Promotion of Leisure Time Physical Activity and Planning.

    Science.gov (United States)

    Wang, Kai; Liu, Jianjun

    2017-09-29

    City parks, important environments built for physical activity, play critical roles in preventing chronic diseases and promoting public health. We used five commonly used park indicators to investigate the spatiotemporal trend of city parks in mainland China between 1981 and 2014 at three scales: national, provincial and city class. City parks in China increased significantly with a turning point occurring around the year 2000. Up until the end of 2014, there were 13,074 city parks totaling 367,962 ha with 0.29 parks per 10,000 residents, 8.26 m² of park per capita and 2.00% of parkland as a percentage of urban area. However, there is still a large gap compared to the established American and Japanese city park systems, and only 5.4% of people aged above 20 access city parks for physical activity. The low number of parks per 10,000 residents brings up the issue of the accessibility to physical activity areas that public parks provide. The concern of spatial disparity, also apparent for all five city park indicators, differed strongly at provincial and city class scales. The southern and eastern coastal provinces of Guangdong, Fujian, Zhejiang and Shandong have abundant city park resources. At the scale of the city classes, mega-city II had the highest of the three ratio indicators and the large city class had the lowest. On one hand, the leading province Guangdong and its mega-cities Shenzhen and Dongguan had park indicators comparable to the United States and Japan. On the other hand, there were still five cities with no city parks and many cities with extremely low park indicators. In China, few cities have realized the importance of city parks for the promotion of leisure time physical activity. It is urgent that state and city park laws or guidelines are passed that can serve as baselines for planning a park system and determining a minimum standard for city parks with free, accessible and safe physical activity areas and sports facilities.

  5. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  6. Multi-criteria approval for evaluating landscape management strategies (Case study: Fruška Gora National Park)

    OpenAIRE

    Lakićević Milena D.; Srđević Bojan M.; Srđević Zorica B.

    2015-01-01

    This paper deals with the problem of multi-criteria evaluation of four management strategies for Fruška Gora National Park. The criteria set was defined in ac­cordance with the IUCN guidelines for management of national parks. Four strategies were evaluated by testing preference intensities for each alternative with the respect to each cri­terion. Alternatives with preference above the approval threshold were approved, and a multi-criteria approval matrix w...

  7. A Novel Location-Centric IoT-Cloud Based On-Street Car Parking Violation Management System in Smart Cities.

    Science.gov (United States)

    Dinh, Thanh; Kim, Younghan

    2016-06-02

    Nowadays, in big cities, parking management is a critical issue from both the driver's side and the city government's side. From the driver's side, how to find an available parking lot in a city is a considerable concern. As a result, smart parking systems recently have received great interest, both in academia and industry. From the city government's side, how to manage and distribute such a limited public parking resource efficiently to give every visitor a fair chance of finding an on-street parking lot is also a considerable concern. However, existing studies of smart parking management focus only on assisting the driver's side to find available parking spaces. This study aims to raise a new perspective on such smart parking management and to propose a novel location-centric IoT-cloud-based parking violation management system. The system is designed to assist authoritative officers in finding parking violations easily and recommends the least cost path for officers so that officers can achieve their highest productivity in finding parking violations and issuing parking tickets. Experimental results show that the system not only improves the productivity of officers in finding parking violations and issuing tickets, but also helps reduce the traveling cost of officers and to reduce the average violation period of violating cars considerably.

  8. A Novel Location-Centric IoT-Cloud Based On-Street Car Parking Violation Management System in Smart Cities

    Science.gov (United States)

    Dinh, Thanh; Kim, Younghan

    2016-01-01

    Nowadays, in big cities, parking management is a critical issue from both the driver’s side and the city government’s side. From the driver’s side, how to find an available parking lot in a city is a considerable concern. As a result, smart parking systems recently have received great interest, both in academia and industry. From the city government’s side, how to manage and distribute such a limited public parking resource efficiently to give every visitor a fair chance of finding an on-street parking lot is also a considerable concern. However, existing studies of smart parking management focus only on assisting the driver’s side to find available parking spaces. This study aims to raise a new perspective on such smart parking management and to propose a novel location-centric IoT-cloud-based parking violation management system. The system is designed to assist authoritative officers in finding parking violations easily and recommends the least cost path for officers so that officers can achieve their highest productivity in finding parking violations and issuing parking tickets. Experimental results show that the system not only improves the productivity of officers in finding parking violations and issuing tickets, but also helps reduce the traveling cost of officers and to reduce the average violation period of violating cars considerably. PMID:27271620

  9. A Novel Location-Centric IoT-Cloud Based On-Street Car Parking Violation Management System in Smart Cities

    Directory of Open Access Journals (Sweden)

    Thanh Dinh

    2016-06-01

    Full Text Available Nowadays, in big cities, parking management is a critical issue from both the driver’s side and the city government’s side. From the driver’s side, how to find an available parking lot in a city is a considerable concern. As a result, smart parking systems recently have received great interest, both in academia and industry. From the city government’s side, how to manage and distribute such a limited public parking resource efficiently to give every visitor a fair chance of finding an on-street parking lot is also a considerable concern. However, existing studies of smart parking management focus only on assisting the driver’s side to find available parking spaces. This study aims to raise a new perspective on such smart parking management and to propose a novel location-centric IoT-cloud-based parking violation management system. The system is designed to assist authoritative officers in finding parking violations easily and recommends the least cost path for officers so that officers can achieve their highest productivity in finding parking violations and issuing parking tickets. Experimental results show that the system not only improves the productivity of officers in finding parking violations and issuing tickets, but also helps reduce the traveling cost of officers and to reduce the average violation period of violating cars considerably.

  10. Historical changes in caribou distribution and land cover in and around Prince Albert National Park: land management implications

    Directory of Open Access Journals (Sweden)

    Maria L. Arlt

    2011-09-01

    Full Text Available In central Saskatchewan, boreal woodland caribou population declines have been documented in the 1940s and again in the 1980s. Although both declines led to a ban in sport hunting, a recovery was only seen in the 1950s and was attributed to wolf control and hunting closure. Recent studies suggest that this time, the population may not be increasing. In order to contribute to the conservation efforts, historical changes in caribou distribution and land cover types in the Prince Albert Greater Ecosystem (PAGE, Saskatchewan, were documented for the period of 1960s to the present. To examine changes in caribou distribution, survey observations, incidental sightings and telemetry data were collated. To quantify landscape changes, land cover maps were created for 1966 and 2006 using current and historic forest resources inventories, fire, logging, and roads data. Results indicate that woodland caribou are still found throughout the study area although their distribution has changed and their use of the National Park is greatly limited. Results of transition prob¬abilities and landscape composition analyses on the 1966 and 2006 land cover maps revealed an aging landscape for both the National Park and provincial crown land portions of the PAGE. In addition, increased logging and the development of extensive road and trail networks on provincial crown land produced significant landscape fragmentation for woodland caribou and reduced functional attributes of habitat patches. Understanding historical landscape changes will assist with ongoing provincial and federal recovery efforts for boreal caribou, forest management planning activities, and landscape restoration efforts within and beyond the Park boundaries.

  11. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  12. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  13. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  14. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    its so-called “comprehensive-integrated” tradition and both the steering and strategic roles of national-level planning have been largely superseded by a more “flexible” planning style fit to promote specific sectoral agendas. While the legacy of land-use planning is still embedded at the local level...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth....

  15. The detrimental consequences for seagrass of ineffective marine park management related to boat anchoring.

    Science.gov (United States)

    La Manna, G; Donno, Y; Sarà, G; Ceccherelli, G

    2015-01-15

    Posidonia oceanica (L.) Delile meadows are recognized as priority habitat for conservation by the EU Habitats Directive. The La Maddalena Archipelago National Park (Mediterranean Sea) P. oceanica meadow, the dominant coastal habitat of the area, is mostly threatened by boat anchoring. 12 years after the establishment of mooring fields and anchoring restrictions, a study was conducted to measure their effectiveness on the conservation of seagrass and the mitigation of anchoring damage. We found that: (i) the condition of P. oceanica was disturbed, both in the mooring fields and in control locations; (ii) mooring fields and anchoring restrictions did not show to be an efficient system for the protection of seagrass, in fact anchor scars increased after the tourist season; (iii) the mooring systems had an impact on the surrounding area of the meadow, probably due to their misuse. On the basis of these results, management recommendations for marine parks are proposed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  17. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  18. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  19. Effectiveness of marine protected areas in managing the drivers of ecosystem change: a case of Mnazi Bay Marine Park, Tanzania.

    Science.gov (United States)

    Machumu, Milali Ernest; Yakupitiyage, Amararatne

    2013-04-01

    Marine protected areas (MPAs) are being promoted in Tanzania to mitigate the drivers of ecosystem change such as overfishing and other anthropogenic impacts on marine resources. The effectiveness of MPAs in managing those drivers was assessed in three ecological zones, seafront, mangrove, and riverine of Mnazi Bay Marine Park, using Participatory Community Analysis techniques, questionnaire survey, checklist and fishery resource assessment methods. Eleven major drivers of ecosystem change were identified. Resource dependence had a major effect in all ecological zones of the park. The results indicated that the park's legislations/regulations, management procedures, and conservation efforts are reasonably effective in managing its resources. The positive signs accrued from conservation efforts have been realized by the communities in terms of increased catch/income, awareness and compliance. However, some natural and anthropogenic drivers continued to threaten the park's sustainability. Furthermore, implementation of resource use and benefit sharing mechanisms still remained a considerable challenge to be addressed.

  20. Beliefs and attitudes toward lethal management of deer in Cuyahoga Valley National Park

    Science.gov (United States)

    Fulton, D.C.; Skerl, K.; Shank, E.M.; Lime, D.W.

    2004-01-01

    We used the theory of reasoned action to help understand attitudes and beliefs about lethal management of deer (Odocoileus virginianus) in Cuyahoga Valley National Park (CVNP), Ohio. We used a mail-back survey to collect data from Ohio residents in the surrounding 9-county area. Two strata were defined: residents control of deer was acceptable (near 71%??4.7%, far 62%??5.5%) and taking no action to reduce deer populations was unacceptable (near 75%??4.5%, far 72%??5.1%). Beliefs about outcomes of lethal control and evaluation of those outcomes proved to be strong predictors of the acceptability of lethal control of deer in CVNP. Lethal control was more acceptable if it was done to prevent severe consequences for humans (e.g., spread of disease, car collisions) or the natural environment (e.g., maintain a healthy deer herd) than to prevent negative aesthetic impacts or personal property damage. Results from the study can be used to assist managers at CVNP as they make decisions regarding alternatives for deer management in the park and to inform others managing abundant deer populations of socially relevant impacts of management actions.

  1. Ecological Conservation, Ecotourism, and Sustainable Management: The Case of Penang National Park

    Directory of Open Access Journals (Sweden)

    Sara Kaffashi

    2015-07-01

    Full Text Available Penang National Park (PNP, as Malaysia’s smallest national park, is one of the few naturally forested areas left on Penang Island, in Peninsular Malaysia. The main objective was to analyse users’ preferences and willingness to pay to enhance improved management of PNP for the dual aim of conservation and recreation. Structural equation modelling (SEM was used to analyse the formation of attitudes towards different aspects of PNP. Results showed that implementing enforcements with rules and regulations and imposing permits and charges on certain activities were the most influential variables of PNPs’ perceptions. The results of a random parameter logit model (RPL demonstrated that visitors placed the highest value on having adequate information about PNP, and the second-highest value on improvements in the park’s ecological management. The welfare measure for improvement in management of PNP against status quo is estimated at about MYR 9. Results also showed that demand for better conservation and management of PNP is relatively price-inelastic. Simulations of the results showed, under a MYR10 admission fee, that improvement in management would have 96% of market share compared with status quo. This study concluded that visitor entrance fees can and ought to be introduced as a means of financing conservation initiatives and possibly preventing congestion.

  2. Ideology and wildlands management: The case of Rondeau Provincial Park, Ontario

    Science.gov (United States)

    Mann, D. L.; Nelson, J. G.

    1980-03-01

    This is a critical examination of some of the basic concepts that have guided management of parks and related reserves, often termed wildlands. Study is focussed on Rondeau Provincial Park, Ontario, and on concepts such as wilderness, primeval forest, and the Carolinian forest. Deer culling and other management policies and practices have been based upon the idea that the highly valued sassafras, tulip, and other species of the Carolinian forest are decreasing due to browsing. Field mapping and analysis of historic vegetation records indicate that this trend is not in fact occurring. Historic research also reveals difficulties in defining the Carolinian or other perceived types of forest for management purposes. A major reassessment of ideology and management policy and practice seem to be required in Rondeau and other wildlands. Vague or general concepts such as wilderness or preservation should be strongly complemented and supported by more precise statements of objectives, a learning attitude, and experimentation and research. As a result of the technical uncertainties and value judgments frequently involved, management should also be based upon the expressed preferences and continuing involvement of citizens.

  3. Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  4. MDOT Materials Laboratories : Environmental Management Plan

    Science.gov (United States)

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  5. Managing infrastructure and underpinning the planned environment

    CSIR Research Space (South Africa)

    Wall, K

    2008-04-01

    Full Text Available Planning the built environment is, or should be, also about providing and managing (i.e. operating and maintaining) this environment, viz. the engineering infrastructure (much of which is underground), structures and public amenities. However, never...

  6. Introduction to Soil Fumigant Management Plans

    Science.gov (United States)

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  7. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  8. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  9. Improving Flood Management Planning in Thailand | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    According to World Bank estimates, this disaster caused US$46.5 billion in ... This project seeks to improve the Flood Management Master Plan, proposing ... New Dutch-Canadian funding for the Climate and Development Knowledge Network.

  10. Special event planning for the emergency manager.

    Science.gov (United States)

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  11. Information Management for Factory Planning and Design

    OpenAIRE

    Chen, Danfang

    2012-01-01

    This thesis is dedicated to the manufacturing industry for the improvement of information management within the factory planningand design domain, and for more efficient factory planning and design. Currently the manufacturing industry lacks sufficient methods for capturing, structuring, and representing information and knowledge for easy access, exchange, integration and reuse within the domain. Therefore the focus of this thesis is on information and knowledge management within factory plan...

  12. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  13. Do You Have a Crisis Management Plan?

    Science.gov (United States)

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  14. Draft of the PHENIX Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants

  15. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  16. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  17. The Role of Local Community in the Marketing Planning for Sustainable Tourism National Park Skadar Lake (Montenegro

    Directory of Open Access Journals (Sweden)

    Darko Lacmanović

    2014-07-01

    Full Text Available The relationship between local community and tourism sector is an important issue in the marketing management of tourist destinations in theoretical and practical terms. It is especially important to consider specific issues relating to sustainable tourism marketing process and the participation of local people in the process. The subject of this work is to determine the existence of significant differences in the local community attachment and involment that may affect the marketing plan in offering different types of sustainable tourism in the National Park “Skadar Lake”.The research was conducted using a survey on a sample of 51 households in the stated area, using few statistical method for processing data (The T-test for independent samples; ANOVA.Examined: the perceived importance of the supply of sustainable forms of tourism; attitude towards tourists / visitors and the perception level of tourism marketing trends.Testing the validity of the hypotheses noted the following. Rejection of Hypothesis 1 clearly states that men and women do not have clear differences of opinions regarding the development of sustainable tourism offers. Partially confirmed Hypothesis 2 showed a more significant difference in the positive attitudes of the middle-aged group, which indicates the need for careful marketing communication in relation to other age groups. Confirming the Hypothesis 3 has highlighted the clearer perception of local residents who are employed in the tourism sector about the advantages and disadvantages of tourism development. The Hypothesis 4 regarding significant monitoring of the developments in the tourism market of highly educated residents and resident-employees in the tourism sector, public services, culture and education in relation to other comparable groups has been confirmed. The rejection of the Hypothesis 5 shows that the place of residence does not significantly affect the views of local residents about the development of

  18. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  19. “If You Don’t Do Parking Management .. Forget Your Behaviour Change, It’s Not Going to Work.”: Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion

    Science.gov (United States)

    Rissel, Chris; Wen, Li Ming

    2017-01-01

    Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may

  20. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  1. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  2. Capturing Tourists’ Preferences for the Management of Community-Based Ecotourism in a Forest Park

    Directory of Open Access Journals (Sweden)

    Cheng Zong

    2017-09-01

    Full Text Available The development of community ecotourism will require the integration of experience, culture, and information for management decision-making. We use a choice experiment to build a community ecotourism preference model incorporating aspects of profound experience and economics in a forest park, test the tourists’ heterogeneity by using a random parameter logit model, and estimate the values of various community ecotourism programs. The empirical results reveal that: (1 Tourists’ preferences for community ecotourism will increase with the inclusion of a mini tour, experiential activities, and the opportunities to taste local dishes and stay at a distinctive bed & breakfast (B&B; (2 The variety of tourists’ social backgrounds and recreational experiences resulted in the heterogeneity of the attributes; (3 The best combinations regarding community ecotourism were a small group size, profound or in-depth experiences, and experiential activities in a forest park. This pilot study generates useful information by demonstrating possible community ecotourism programs in the forest park, along with suggestions for a quality improvement program.

  3. Robust economic optimization and environmental policy analysis for microgrid planning: An application to Taichung Industrial Park, Taiwan

    International Nuclear Information System (INIS)

    Yu, Nan; Kang, Jin-Su; Chang, Chung-Chuan; Lee, Tai-Yong; Lee, Dong-Yup

    2016-01-01

    This study aims to provide economical and environmentally friendly solutions for a microgrid system with distributed energy resources in the design stage, considering multiple uncertainties during operation and conflicting interests among diverse microgrid stakeholders. For the purpose, we develop a multi-objective optimization model for robust microgrid planning, on the basis of an economic robustness measure, i.e. the worst-case cost among possible scenarios, to reduce the variability among scenario costs caused by uncertainties. The efficacy of the model is successfully demonstrated by applying it to Taichung Industrial Park in Taiwan, an industrial complex, where significant amount of greenhouse gases are emitted. Our findings show that the most robust solution, but the highest cost, mainly includes 45% (26.8 MW) of gas engine and 47% (28 MW) of photovoltaic panel with the highest system capacity (59 MW). Further analyses reveal the environmental benefits from the significant reduction of the expected annual CO_2 emission and carbon tax by about half of the current utility facilities in the region. In conclusion, the developed model provides an efficient decision-making tool for robust microgrid planning at the preliminary stage. - Highlights: • Developed robust economic and environmental optimization model for microgrid planning. • Provided Pareto optimal planning solutions for Taichung Industrial Park, Taiwan. • Suggested microgrid configuration with significant economic and environmental benefits. • Identified gas engine and photovoltaic panel as two promising energy sources.

  4. A CLEAR Plan for School Crisis Management.

    Science.gov (United States)

    Moriarty, Anthony; And Others

    1993-01-01

    Although many school formulas for crisis management are well coordinated internally, many are also shortsighted in recognizing when a school crisis falls simultaneously into law enforcement's domain. An Illinois high school has devised CLEAR, a crisis management plan delineating cognizance of personnel, the linkages they establish, accountability…

  5. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  6. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  7. Teacher Plan Book. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    Project MET (Management for Effective Teaching) is a pilot project that provides effective, practical ways of managing the Fairfax County (Virginia) Public School system's instructional Program of Studies (POS) for elementary school students. This planning booklet is a part of the support kit that is used by teachers as an aid to implementing…

  8. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  9. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...

  10. Total Quality Management Master Plan

    Science.gov (United States)

    1989-01-01

    Enhanced competitiveness in the private . public and international sectors - Increased cash flow, influenced by contractor’s contributions to quality I...the project applies novel public- sector compensation concepts gleaned from the best in the private sector . Major employee development opportunities...management must strive to upgrade the quality of worklife which will also contribute to an environment which fosters continuous improvement. Individuals

  11. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  12. Food habits of American black bears as a metric for direct management of humanbear conflict in Yosemite Valley, Yosemite National Park, California

    Science.gov (United States)

    Greenleaf, S.S.; Matthews, S.M.; Wright, R.G.; Beecham, J.J.; Leithead, H.M.

    2009-01-01

    The management of human-American black bear (Ursus americanus) conflict has been of significant concern for Yosemite National Park (YNP) personnel since the 1920s. Park managers implemented the YNP Human-Bear Management Plan in 1975 in an effort to reduce human-bear conflicts, especially in the extensively developed Yosemite Valley (YV). We used scat analysis to estimate annual and seasonal food habits of black bears in YV during 2001-02. We assessed the success of efforts to reduce the availability of anthropogenic foods, including garbage, by examining changes in the diet compared to a study from 1974-78 (Graber 1981). We also quantified consumption of non-native fruit to address its possible contribution to human-bear conflicts. The annual percent volume of human-provided food and garbage in black bear scats in YV decreased from 21% to 6% between 1978 and 2002, indicating YNP efforts have been effective. We found high use of non-native apples by bears throughout YV. Non-native food sources could be contributing to habituation and food conditioning, given their proximity to developed areas of YV. We recommend that YNP managers continue to (1) adapt and improve their management tools to address changing circumstances, (2) quantify the success of new management tools, and (3) reduce the availability of non-native food sources. ?? 2009 International Association for Bear Research and Management.

  13. Managing visitor impacts in parks: A multi-method study of the effectiveness of alternative management practices

    Science.gov (United States)

    Park, L.O.; Marion, J.L.; Manning, R.E.; Lawson, S.R.; Jacobi, C.

    2008-01-01

    How can recreation use be managed to control associated environmental impacts? What management practices are most effective and why? This study explored these and related questions through a series of experimental ?treatments? and associated ?controls? at the summit of Cadillac Mountain in Acadia National Park, a heavily used and environmentally fragile area. The treatments included five management practices designed to keep visitors on maintained trails, and these practices ranged from ?indirect? (information/education) to ?direct? (a fence bordering the trail). Research methods included unobtrusive observation of visitors to determine the percentage of visitors who walked off-trail and a follow-up visitor survey to explore why management practices did or didn?t work. All of the management practices reduced the percentage of visitors who walked off-trail. More aggressive applications of indirect practices were more effective than less aggressive applications, and the direct management practice of fencing was the most effective of all. None of the indirect management practices reduced walking off-trail to a degree that is likely to control damage to soil and vegetation at the study site. Study findings suggest that an integrated suite of direct and indirect management practices be implemented on Cadillac Mountain (and other, similar sites) that includes a) a regulation requiring visitors to stay on the maintained trail, b) enforcement of this regulation as needed, c) unobtrusive fencing along the margins of the trail, d) redesign of the trail to extend it, widen it in key places, and provide short spur trails to key ?photo points?, and e) an aggressive information/education program to inform visitors of the regulation to stay on the trail and the reasons for it. These recommendations are a manifestation of what may be an emerging principle of park and outdoor recreation management: intensive use requires intensive management.

  14. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  15. Stakeholders of Nature Tourism Management in SPTN Area II Majalengka, Gunung Ciremai National Park

    Directory of Open Access Journals (Sweden)

    Mita Anindisa

    2018-03-01

    Full Text Available Ecotourism management in Gunung Ciremai National Park is fully managed by third party which are community organizations, state-owned enterprises, and non-governmental organizations. The aims of this research is to identify stakeholders, categorize stakeholders based on interests and influences, also to identify space and determine the level of stakeholder participation. The data obtained using questionnaire, interview, and direct observation were analyzed with stakeholder analysis matrix and the level of stakeholder participation. Fourteen stakeholders involved within the programs based on interests and influences are governmental institutions, cooperations, non-governmental organizations, and community organization with two classifications (key player and crowd. In this management there is no subject and context setter. Most of the stakeholders participate to control level in level of participation. Keywords: ecotourism, interest and influence, level of participation, stakeholder

  16. The spread and maturation of strategic adaptive management within and beyond South African national parks

    Directory of Open Access Journals (Sweden)

    Stefanie Freitag

    2014-09-01

    Full Text Available Natural resource management is embedded within social-ecological environments and requires decisions to be taken within this broad context, including those that pertain to protected areas. This realization has led to South African National Parks adopting a strategic adaptive management approach to decision making. Through narrative, we show why and how this practice has progressively spread and evolved both within the organization and beyond, over the past two decades. A number of catalytic events and synergies enabled a change from reactive tactical management approaches to more inclusive forward-looking approaches able to embrace system complexity and associated uncertainty and change. We show how this long period of innovation has lead to an increased appreciation for the heterogeneous social-ecological system, and for the importance of constructing relationships and colearning, such that organizational transformation has enabled more legitimate and effective operation within an expanding and diversifying constituency.

  17. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  18. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  19. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  20. Baseline ambient sound levels in Dry Tortugas National Park

    Science.gov (United States)

    2012-11-01

    The Federal Aviation Administration (FAA) and the National Park Service (NPS), with the assistance of the U.S. Department of Transportation, John A. Volpe National Transportation Systems Center (Volpe Center) are developing Air Tour Management Plans ...

  1. Baseline ambient sound levels in Everglades National Park

    Science.gov (United States)

    2012-11-01

    The Federal Aviation Administration (FAA) and the National Park Service (NPS), with the assistance of the U.S. Department of Transportation, John A. Volpe National Transportation Systems Center (Volpe Center) are developing Air Tour Management Plans ...

  2. Potential impacts of projected climate change on vegetation management in Hawai`i Volcanoes National Park

    Science.gov (United States)

    Camp, Richard J.; Loh, Rhonda; Berkowitz, S. Paul; Brinck, Kevin W.; Jacobi, James D.; Price, Jonathan; McDaniel, Sierra; Fortini, Lucas B.

    2018-01-01

    Climate change will likely alter the seasonal and annual patterns of rainfall and temperature in Hawai`i. This is a major concern for resource managers at Hawai`i Volcanoes National Park where intensely managed Special Ecological Areas (SEAs), focal sites for managing rare and endangered plants, may no longer provide suitable habitat under future climate. Expanding invasive species’ distributions also may pose a threat to areas where native plants currently predominate. We combine recent climate modeling efforts for the state of Hawai`i with plant species distribution models to forecast changes in biodiversity in SEAs under future climate conditions. Based on this bioclimatic envelope model, we generated projected species range maps for four snapshots in time (2000, 2040, 2070, and 2090) to assess whether the range of 39 native and invasive species of management interest are expected to contract, expand, or remain the same under a moderately warmer and more variable precipitation scenario. Approximately two-thirds of the modeled native species were projected to contract in range, while one-third were shown to increase. Most of the park’s SEAs were projected to lose a majority of the native species modeled. Nine of the 10 modeled invasive species were projected to contract within the park; this trend occurred in most SEAs, including those at low, middle, and high elevations. There was good congruence in the current (2000) distribution of species richness and SEA configuration; however, the congruence between species richness hotspots and SEAs diminished by the end of this century. Over time the projected species-rich hotspots increasingly occurred outside of current SEA boundaries. Our research brought together managers and scientists to increase understanding of potential climate change impacts, and provide needed information to address how plants may respond under future conditions relative to current managed areas.

  3. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  4. Winter visitor use planning in Yellowstone and Grand Teton National Parks

    Science.gov (United States)

    John A. Sacklin; Kristin L. Legg; M. Sarah Creachbaum; Clifford L. Hawkes; George Helfrich

    2000-01-01

    Winter use in Yellowstone and Grand Teton National Parks increased dramatically in the 1980s and early 1990s. That increase and the emphasis on snowmobiles as the primary mode of transportation brought into focus a host of winter-related issues, including air pollution, unwanted sound, wildlife impacts and the adequacy of agency budgets, staff and infrastructure to...

  5. LEGIBILITY OF NEIGHBORHOOD PARKS AND ITS IMPACT ON SOCIAL INTERACTION IN A PLANNED RESIDENTIAL AREA

    Directory of Open Access Journals (Sweden)

    Amine Moulay

    2016-04-01

    Full Text Available Neighbourhood parks are designed to provide opportunities for leisure and communal activities for the residents. However, studies have indicated that social interactions in these spaces are not at a satisfactory level. In the urban design context, a good public space should be legible to the observers. Legibility refers to the apparent clarity of the cityscape that directs people’s movement, pattern of activities and form of interaction in public spaces. This paper discusses park’s legibility and its impact on social interaction within a neighbourhood. The results presented are based on a questionnaire survey and a mental mapping exercise conducted with residents in the city of Putrajaya, Malaysia. The results demonstrate a strong relationship between the park’s legibility and the social interactions among the park users. A clear structure of the setting and fewer sight obstacles found within the parks influence residents’ pattern and the Intensity of outdoor activities. The findings contribute to the development of legible environments in neighbourhood park design, its positive impact on social interaction, and social bonding among the residents.

  6. The State of Water and Wastewater Management in the Municipalities of the Roztocze National Park

    Directory of Open Access Journals (Sweden)

    Krzysztof Jóżwiakowski

    2018-03-01

    Full Text Available The aim of this paper is to present the current state of water and sewage management in the communes where the Roztocze National Park (RNP is located. The park is located in Lubelskie voivodship, in the territory of four communes: Zamość, Zwierzyniec, Adamów and Józefów, while its buffer zone is located in the communes of Krasnobród, Tereszpol and Szczebrzeszyn. The paper uses data from surveys conducted in these municipalities in 2016. On average, 68.9% of the population used the water supply system in the municipalities surveyed, while 33.4% of the inhabitants had the possibility of discharging sewage to the sewerage system. In the area of the communes, there are 10 collective, mechanical and biological wastewater treatment plants with a capacity exceeding 5 m 3 ·d -1 . The households which are not connected to the sewage network discharge wastewater mainly to non-return tanks. Four out of the seven surveyed communities had 64 domestic sewage treatment plants, including 60 systems with infiltration drainage, which do not ensure high efficiency of removing pollution and may even contribute to the degradation of groundwater quality. In order to solve the existing problems in the area of sewage and water management occurring in the communes where the Roztocze National Park is located, it is necessary to further develop collective sewage systems and equip the areas with dispersed buildings with highly efficient, residential sewage treatment plants, e.g. constructed wetlands.

  7. Prediction of Chinese Drivers' Intentions to Park Illegally in Emergency Lanes: An Application of the Theory of Planned Behavior.

    Science.gov (United States)

    Zheng, Yubing; Ma, Yang; Guo, Lixin; Cheng, Jianchuan; Zhang, Yunlong

    2018-06-21

    Illegal parking in emergency lanes (paved highway shoulders) is becoming a serious road safety issue in China. The aim of this study was: 1) to examine the utility of the theory of planned behavior (TPB) extended with descriptive norm, past behavior, facilitating and deterring circumstances, sensation seeking and invulnerability in predicting Chinese drivers' intentions in illegal emergency lane parking; 2) to investigate whether respondents' demographic characteristics would impact their views towards the behavior and predictive patterns of intentions; 3) to identify significant predictors of intentions. In this cross-sectional study, eligible respondents were all qualified Chinese drivers. A self-administered questionnaire was employed to collect data including demographic information, descriptive norm, past behavior, facilitating and deterring circumstances, sensation seeking and scenario-based invulnerability combined with TPB constructs. Descriptive statistics, MANOVAs and a series of hierarchical multiple linear regression analyses were conducted in SPSS. A total of 435 qualified drivers (234 males and 201 females) with a mean age of 35.2 years (S.D.=10.3) were included in analysis. The descriptive analysis showed that most participants reported weak intentions (M = 2.35) to park illegally in emergency lanes with negative attitude (M = 3.19), low perceived support (M = 2.91) and high control (M = 5.08) over the behavior. The model succeeded in explaining 64% of the variance in intentions for the whole sample, and principal TPB components accounted for 21% of variance in intentions after demographic variables were controlled. MANOVAs revealed that significant differences of respondents' opinions towards illegal emergency lane parking were only found between better-educated drivers (with college education background) and less-educated ones. Separate regression analyses revealed that predictive pattern of better-educated participants also

  8. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  9. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  10. Environment management conflict in Mount Tangkuban Perahu Nature Reserve and Nature Park, North Bandung, West Java

    Science.gov (United States)

    Damanik, Demak Ely Riana; Sjarmidi, Achmad

    2014-03-01

    Nature Park Mount Tangkuban Perahu is part of the Nature Reserve that defined as utilization zone. Until now the nature park continues to experience disruption and threat caused by human activities such as tourists, local peoples, and administrators so that giving rise to the area conflict. The number of rules did not guarantee high protection of the area and even can lead conflict. The evaluation performance of stakeholder and analysis environmental sustainablity, seems that there are not sustainable. The performance score of stakeholders in conservation efforts in the field of preservation and protection are 1.5 and 2 respectively (low category), while the area of utilization is 2 (low category). Total score condition of management area are 1.75 (low category). Visitors assume that Tangkuban Perahu was categorized as cheap attraction (benefits, comfort and safety are considerable (> 50%). Most visitors have a good perception of the facilities (66.2%), ticket price (64.6%), and ecosystems (78.5%). However this is not followed by magnitude of willingness to pay from the visitor to keep the preserved area (61.5% of visitors want to pay recreation. Some visitors (47.69%) mentioned the need of management system implementation to ensure the region sustainability. The causes and alternative conflict resolution also discussed in this study.

  11. Invasive Plant Species in the National Parks of Vietnam

    OpenAIRE

    Bernard Dell; Pham Quang Thu; Dang Thanh Tan

    2012-01-01

    The impact of invasive plant species in national parks and forests in Vietnam is undocumented and management plans have yet to be developed. Ten national parks, ranging from uncut to degraded forests located throughout Vietnam, were surveyed for invasive plant species. Transects were set up along roads, trails where local people access park areas, and also tracks through natural forest. Of 134 exotic weeds, 25 were classified as invasive species and the number of invasive species ranged from ...

  12. PFP Interface identification and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  13. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  14. New plant records for Tankwa Karoo National Park, South Africa

    Directory of Open Access Journals (Sweden)

    Stoffel P. Bester

    2012-11-01

    Conservation implications: Although the Tankwa Karoo National Park falls within the Succulent Karoo Biome (a biodiversity hotspot of international importance, information on its plant diversity is insufficient because it is an under-collected area. Results of this study will guide conservation and supply occurrence and distribution data required to compile management plans for the park.

  15. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  16. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  17. Put in value of the Santa Teresa Park as a cultural landscape. Project and Ordinance of the Landscape in the General Guidelines of its Master Plan

    Directory of Open Access Journals (Sweden)

    Nair Rosana Sommaruga Montiel

    2018-03-01

    Full Text Available The paper is a summary of the landscape studies developed in the framework of 'Lineamientos generales para el Plan Director del Parque Santa Teresa' (General guidelines for Santa Teresa Park Master Plan, agreement made between the Ministry of Tourism, and the Faculty of Architecture, Design And Urbanism of the University of the Republic between August 2015 and July 2016. The purpose of the Convention is to position the Santa Teresa Park as a "model park" for Uruguay, putting in value its patrimonial, landscape and Environmental characteristics, thus contributing to its tourism and sociocultural promotion. The entire project includes and combines different disciplinary studies as well as external contributions. The Research program “Landscape and Public Space” from the Institute of Design in collaboration with VIDIALAB develops the Characterization and Landscape Assessment of the Park, through studies and proposals on its landscape structures, sociocultural perceptions and the qualification of the visual landscape.

  18. Planning and Management - the Most Neglected Activities in ...

    African Journals Online (AJOL)

    Lexicography has a long history of ineffective planning and inefficient management. This article applies the methods of general planning and management to the planning and management of a lexicographic unit. Keywords: Planning, management, mission statement, strategic focus Areas, performance areas, situational ...

  19. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  20. Maloti Drakensberg Transfrontier Park joint management: Sehlabathebe National Park (Lesotho) and the uKhahlamba Drakensberg Park World Heritage Site (South Africa)

    Science.gov (United States)

    John M. Crowson

    2011-01-01

    On 8 April 2005, the first Joint Management Committee meeting was held at Qacha's Nek, Lesotho. This was to ensure co-operative management through joint management. The formation of a Joint Management Committee was part of the Bilateral Maloti Drakensberg Transfrontier Project agreement and consisted of officials from the Ministry of Tourism, Environment and...

  1. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  2. Urgency of Capacity Building in Local Finance Management on Decentralization Era (The Dynamic of Parking Taxes Management at Banguntapan District, Bantul Region DI Yogyakarta Province

    Directory of Open Access Journals (Sweden)

    Bambang Sunaryo

    2014-12-01

    Full Text Available Capacity building of local finance management becomes important on decentralizations era. Empirically this research is aim to show that the parking tax management at glance seen as an administrative- procedural policy domain cannot release from phenomena on the existence of problematic pathology for regional financial management. District of Bantul Banguntapan characteristic as its suburbs form the main attraction in the selection of research because of the general locus in sub-urban area, began to metamorphose into a parking tax revenues from regions that contribute to the area though not as big financial contribution income tax parking tax in urban areas. The Banguntapan sub district was chosen as analysis unit in this research to represent the issue of parking tax management in sub urban area of Bantul. This was due to the characteristic of Bantul area as sub urban area that can be seen from the characteristics of sub urban in Banguntapan sub district. Moreover, the Banguntapan sub district is the only area in Bantul which has a parking tax subject that the cost is self-assessment and flat thus the dynamic of local finance managing problems can be observed and in-depth analysed in Banguntapan sub district to seek the comparison of those 2 parking tax collection systems.

  3. Site management plan: Douglas Point Ecological Laboratory

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.

    1979-01-01

    A portion of the Douglas Point Site has been set aside for use as an ecological monitoring facility (DPEL). Plans call for it to provide for long-term scientific study and analysis of specific terrestrial and aquatic ecological systems representative of the coastal plain region of the mid-Atlantic United States. Discussion of the program is presented under the following section headings: goals and objectives; management and organization of DPEL; laboratory director; site manager; monitoring manager; research manager; and, organizational chart. The seven appendixes are entitled: detailed site description; supplemental land use plan; contract between Potomac Electric Power Company and Charles County Community Collge (CCCC); research and monitoring projects initiated at the Douglas Point Power Plant site; advisory committees; facilities and equipment; and CCCC personnel resumes

  4. The North Sea offshore wind park network and the role of SMEs in project benefit management across actors

    DEFF Research Database (Denmark)

    Brink, Tove

    routes for SMEs to enhance Project Benefit Management. It is especially difficult to move to the partner-driven approach. Here the intermediary roles of either demand-driven or supplier-driven SME approach are needed before the partner-driven approach is likely to be achieved. A contribution is hereby......The research in this paper reveals how Small and Medium-sized Enterprises (SMEs) can contribute to project benefit management for offshore wind energy to be competitive. The research is based on a longitudinal qualitative study starting in 2011 with 10 SME wind park suppliers. The research...... continued with a focus group interview and individual interviews with 20 larger enterprises and SMEs within operation and maintenance in wind parks with follow up in a seminar May 2015. The findings reveal opportunities and challenges for SMEs to contribute to project benefit management in wind parks. Four...

  5. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  6. Basic diagnosis of solid waste generated at Agua Blanca State Park to propose waste management strategies.

    Science.gov (United States)

    Laines Canepa, José Ramón; Zequeira Larios, Carolina; Valadez Treviño, Maria Elena Macías; Garduza Sánchez, Diana Ivett

    2012-03-01

    State parks are highly sensitive areas of great natural importance and tourism value. Herein a case study involving a basic survey of solid waste which was carried out in 2006 in Agua Blanca State Park, Macuspana, Tabasco, Mexico with two sampling periods representing the high and low tourist season is presented. The survey had five objectives: to find out the number of visitors in the different seasons, to consider the daily generation of solid waste from tourist activities, to determine bulk density, to select and quantify sub-products; and to suggest a possible treatment. A daily average of 368 people visited the park: 18,862 people in 14 days during the high season holiday (in just one day, Easter Sunday, up to 4425 visitors) and 2092 visitors in 43 days during the low season. The average weight of the generated solid waste was 61.267 kg day(-1) and the generated solid waste average per person was 0.155 kg person(-1 ) day(-1). During the high season, the average increased to 0.188 kg person(-1 ) day(-1) and during the low season, the average decreased to 0.144 kg person(-1 ) day(-1). The bulk density average was 75.014 kg m(-3), the maximum value was 92.472 kg m(-3) and the minimum was 68.274 kg m(-3). The sub-products comprised 54.52% inorganic matter; 32.03% organic matter, 10.60% non-recyclable and 2.85% others. Based on these results, waste management strategies such as reuse/recycling, aerobic and anaerobic digestion, the construction of a manual landfill and the employment of a specialist firm were suggested.

  7. The potential distributions, and estimated spatial requirements and population sizes, of the medium to large-sized mammals in the planning domain of the Greater Addo Elephant National Park project

    Directory of Open Access Journals (Sweden)

    A.F. Boshoff

    2002-12-01

    Full Text Available The Greater Addo Elephant National Park project (GAENP involves the establishment of a mega biodiversity reserve in the Eastern Cape, South Africa. Conservation planning in the GAENP planning domain requires systematic information on the potential distributions and estimated spatial requirements, and population sizes of the medium to largesized mammals. The potential distribution of each species is based on a combination of literature survey, a review of their ecological requirements, and consultation with conservation scientists and managers. Spatial requirements were estimated within 21 Mammal Habitat Classes derived from 43 Land Classes delineated by expert-based vegetation and river mapping procedures. These estimates were derived from spreadsheet models based on forage availability estimates and the metabolic requirements of the respective mammal species, and that incorporate modifications of the agriculture-based Large Stock Unit approach. The potential population size of each species was calculated by multiplying its density estimate with the area of suitable habitat. Population sizes were calculated for pristine, or near pristine, habitats alone, and then for these habitats together with potentially restorable habitats for two park planning domain scenarios. These data will enable (a the measurement of the effectiveness of the GAENP in achieving predetermined demographic, genetic and evolutionary targets for mammals that can potentially occur in selected park sizes and configurations, (b decisions regarding acquisition of additional land to achieve these targets to be informed, (c the identification of species for which targets can only be met through metapopulation management,(d park managers to be guided regarding the re-introduction of appropriate species, and (e the application of realistic stocking rates. Where possible, the model predictions were tested by comparison with empirical data, which in general corroborated the

  8. Using integrated research and interdisciplinary science: Potential benefits and challenges to managers of parks and protected areas

    Science.gov (United States)

    van Riper, Charles; Powell, Robert B.; Machlis, Gary; van Wagtendonk, Jan W.; van Riper, Carena J.; von Ruschkowski, Eick; Schwarzbach, Steven E.; Galipeau, Russell E.

    2012-01-01

    Our purpose in this paper is to build a case for utilizing interdisciplinary science to enhance the management of parks and protected areas. We suggest that interdisciplinary science is necessary for dealing with the complex issues of contemporary resource management, and that using the best available integrated scientific information be embraced and supported at all levels of agencies that manage parks and protected areas. It will take the commitment of park managers, scientists, and agency leaders to achieve the goal of implementing the results of interdisciplinary science into park management. Although such calls go back at least several decades, today interdisciplinary science is sporadically being promoted as necessary for supporting effective protected area management(e.g., Machlis et al. 1981; Kelleher and Kenchington 1991). Despite this history, rarely has "interdisciplinary science" been defined, its importance explained, or guidance provided on how to translate and then implement the associated research results into management actions (Tress et al. 2006; Margles et al. 2010). With the extremely complex issues that now confront protected areas (e.g., climate change influences, extinctions and loss of biodiversity, human and wildlife demographic changes, and unprecedented human population growth) information from more than one scientific discipline will need to be brought to bear in order to achieve sustained management solutions that resonate with stakeholders (Ostrom 2009). Although interdisciplinary science is not the solution to all problems, we argue that interdisciplinary research is an evolving and widely supported best practice. In the case of park and protected area management, interdisciplinary science is being driven by the increasing recognition of the complexity and interconnectedness of human and natural systems, and the notion that addressing many problems can be more rapidly advanced through interdisciplinary study and analysis.

  9. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  10. Informal and formal trail monitoring protocols and baseline conditions: Acadia National Park

    Science.gov (United States)

    Marion, Jeffrey L.; Wimpey, Jeremy F.; Park, L.

    2011-01-01

    At Acadia National Park, changing visitor use levels and patterns have contributed to an increasing degree of visitor use impacts to natural and cultural resources. To better understand the extent and severity of these resource impacts and identify effective management techniques, the park sponsored this research to develop monitoring protocols, collect baseline data, and identify suggestions for management strategies. Formal and informal trails were surveyed and their resource conditions were assessed and characterized to support park planning and management decision-making.

  11. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    CARPENTER, G.A.

    1999-01-01

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  12. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  13. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  14. Analytical aids in land management planning

    Science.gov (United States)

    David R. Betters

    1978-01-01

    Quantitative techniques may be applied to aid in completing various phases of land management planning. Analytical procedures which have been used include a procedure for public involvement, PUBLIC; a matrix information generator, MAGE5; an allocation procedure, linear programming (LP); and an input-output economic analysis (EA). These techniques have proven useful in...

  15. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  16. Energy conservation: its planning and management

    International Nuclear Information System (INIS)

    Nanda, K.S.; Patra, K.C.

    1995-01-01

    Energy conservation, its planning and management and the development of renewable energy systems of proven design are very worthy challenges for all. Energy education at various levels is most important particularly in the development of renewable energy technology. 2 refs., 3 tabs

  17. Strategic Planning for Management Information Systems.

    Science.gov (United States)

    Ein-Dor, Phillip; Segev, Eli

    1978-01-01

    Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)

  18. Problems and Prospects of Curbside Parking in Lahore: PolicyImplications for Effective Management

    OpenAIRE

    Sabir , Salman; Anjum , Ghulam Abbas

    2017-01-01

    International audience; Lahore is a fast-growing metropolis experiencing rapid growth in people and vehicle population. This unprecedented growth has led to urban sprawl, dependency on motorized transport, and increased parking space demands throughout the city limits. Off-street parking supply is insufficient and the demand is met mainly by roadside parking with and without any authorization. Parking on the roads and sidewalks has resulted in reduction in traffic capacity, traffic speed vari...

  19. SUBMONTANE FOREST AT BANTIMURUNG BULUSARAUNG NATIONAL PARK: HOTSPOT OF BIRD DIVERSITY AND ITS MANAGEMENT CONSERVATION

    Directory of Open Access Journals (Sweden)

    Indra A.S.L.P. Putri

    2015-09-01

    Full Text Available Submontane forest is considered as one of the biodiversity hotspot.  Scientific information on bird diversity in this forest, however are lacking.  The aim of this research was to find out submontane forest bird diversity and its conservation management.  The research was carried out in three forests areas at Bantimurung Bulusaraung National Park submontane forest.  Point Count method was used to observe bird population. Data were analyzed using Shannon-Weiner diversity index, Pielou Evenness index, Simpson dominance index, Margalef species richness index, and Sorensen Similarity index. The significance different between the number of individual bird was tested using Kolmogorov-Smirnov test.  The result showed that submontane forest at Bantimurung Bulusaraung National Park is rich in bird diversity, bird endemic species and protected bird species.  There was a significant different on the number of individual bird at several human disturbance levels.  Based on these conditions, it is important to enhance understanding of the local people regarding zonation and develop cooperation with many stakeholders to increase the local community awareness concerning forest conservation. It is also necessary to ensure the sustainability of the National Park’s conservation program to maintain the submontane forest conservation.

  20. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  1. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  2. Environment management conflict in Mount Tangkuban Perahu Nature Reserve and Nature Park, North Bandung, West Java

    Energy Technology Data Exchange (ETDEWEB)

    Damanik, Demak Ely Riana, E-mail: damanikdemak@gmail.com, E-mail: sjarmidi@sith.itb.ac.id; Sjarmidi, Achmad, E-mail: damanikdemak@gmail.com, E-mail: sjarmidi@sith.itb.ac.id [Bioresources Management Research Group, School of Life Science and Technology, Institut Teknologi Bandung, Jl. Ganesha 10 Bandung 40132 (Indonesia)

    2014-03-24

    Nature Park Mount Tangkuban Perahu is part of the Nature Reserve that defined as utilization zone. Until now the nature park continues to experience disruption and threat caused by human activities such as tourists, local peoples, and administrators so that giving rise to the area conflict. The number of rules did not guarantee high protection of the area and even can lead conflict. The evaluation performance of stakeholder and analysis environmental sustainablity, seems that there are not sustainable. The performance score of stakeholders in conservation efforts in the field of preservation and protection are 1.5 and 2 respectively (low category), while the area of utilization is 2 (low category). Total score condition of management area are 1.75 (low category). Visitors assume that Tangkuban Perahu was categorized as cheap attraction (< Rp. 100,000 pervisit), but the benefits, comfort and safety are considerable (> 50%). Most visitors have a good perception of the facilities (66.2%), ticket price (64.6%), and ecosystems (78.5%). However this is not followed by magnitude of willingness to pay from the visitor to keep the preserved area (61.5% of visitors want to pay < 100,000). Most argue that the management of the area classified as good (78.5%), but approximately 38.5% of visitors said that need additional facilities such as children's play facilities in the area. This shows the lack of understanding of visitor of the meaning of natural recreation. Some visitors (47.69%) mentioned the need of management system implementation to ensure the region sustainability. The causes and alternative conflict resolution also discussed in this study.

  3. Environment management conflict in Mount Tangkuban Perahu Nature Reserve and Nature Park, North Bandung, West Java

    International Nuclear Information System (INIS)

    Damanik, Demak Ely Riana; Sjarmidi, Achmad

    2014-01-01

    Nature Park Mount Tangkuban Perahu is part of the Nature Reserve that defined as utilization zone. Until now the nature park continues to experience disruption and threat caused by human activities such as tourists, local peoples, and administrators so that giving rise to the area conflict. The number of rules did not guarantee high protection of the area and even can lead conflict. The evaluation performance of stakeholder and analysis environmental sustainablity, seems that there are not sustainable. The performance score of stakeholders in conservation efforts in the field of preservation and protection are 1.5 and 2 respectively (low category), while the area of utilization is 2 (low category). Total score condition of management area are 1.75 (low category). Visitors assume that Tangkuban Perahu was categorized as cheap attraction ( 50%). Most visitors have a good perception of the facilities (66.2%), ticket price (64.6%), and ecosystems (78.5%). However this is not followed by magnitude of willingness to pay from the visitor to keep the preserved area (61.5% of visitors want to pay < 100,000). Most argue that the management of the area classified as good (78.5%), but approximately 38.5% of visitors said that need additional facilities such as children's play facilities in the area. This shows the lack of understanding of visitor of the meaning of natural recreation. Some visitors (47.69%) mentioned the need of management system implementation to ensure the region sustainability. The causes and alternative conflict resolution also discussed in this study

  4. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  5. From landscapes to soundscapes: understanding and managing natural quiet in the national parks

    Science.gov (United States)

    Robert Manning; William Valliere; Jeffery Hallo; Peter Newman; Ericka Pilcher; Michael Savidge; Dan Dugan

    2007-01-01

    Research at Muir Woods Natural Monument suggests that soundscapes are an important component of parks and outdoor recreation, that human-caused noise is a potentially important indicator of quality for park soundscapes, and that visitors have normative standards for the maximum acceptable level of human-caused noise in parks. Formulating indicators and standards of...

  6. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  7. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  8. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  9. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  10. Fear of crime in urban parks

    DEFF Research Database (Denmark)

    Maruthaveeran, Sreetheran; Konijnendijk, Cecil Cornelis

    2015-01-01

    This study was conducted to determine the attributes which evoke ‘fear of crime’ and to determine the defensive behaviour among the urban park users. Findings are based on qualitative studies undertaken in the city of Kuala Lumpur among the park and non-park users (N = 19) by means of semi......-structured in-depth interviews. The interview consists of respondents from various age, gender and race. The results revealed universal similarities to other cultures on fear of crime in urban green spaces. This study has highlighted eight themes on the attributes which evoke fear among the residents of Kuala...... behaviour towards crime in urban parks but this was only observed among the women. This paper has also highlighted the implications on park planning and management from the comments given by the respondents. Though the aspect of fear towards crime in urban green spaces is not a major focus in Malaysia...

  11. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  12. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... 219 National Forest System Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning AGENCY... Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new...

  13. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  14. National Parks

    Data.gov (United States)

    Department of Transportation — National Park Service unit boundaries (NTAD). These park boundaries signify legislative boundary definitions and local park names have been consolidated according to...

  15. Ungulate management in national parks of the United States and Canada

    Science.gov (United States)

    Demarais, S.; Cornicelli, L.; Kahn, R.; Merrill, E.; Miller, C.; Peek, J.M.; Porter, W.F.; Sargeant, G.A.

    2012-01-01

    Enabling legislation—that which gives appropriate officials the authority to implement or enforce the law—impacts management of ungulates in national parks of Canada and the United States (U.S.). The initial focus of such legislation in both countries centered on preserving natural and culturally significant areas for posterity. Although this objective remains primary, philosophies and practices have changed. A Canadian vision for ungulate management emerged during the latter half of the 20th century to protect and maintain or restore the ecological integrity of representative samples of the country’s 39 distinct landscapes, and to include provisions for traditional hunting and fishing practices representative of past cultural impacts on the environment. The current ungulate management approach in the U.S. relies on natural (ecological) processes, as long as normal conditions are promoted and there is no impairment of natural resources. Emphasizing natural processes as the basis has been a challenge because ecosystem dynamics are complex and management is multi-jurisdictional. Additionally, natural regulation typically will not prevent ungulates from reaching and sustaining densities that are incompatible with preservation or restoration of native flora and fauna, natural processes, or historical landscapes.

  16. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  17. The status of wastewater management in Shokuhieh industrial park (A case study of Qom province

    Directory of Open Access Journals (Sweden)

    Mohammad Fahiminia

    2015-12-01

    Full Text Available Background: Water resource management is a strategic issue in Qom city. Water scarcity is one of the most critical concerns of industrial estates. This study aimed to evaluate wastewater management in the Shokuhieh industrial park of Qom province in 2013. Methods: This is a descriptive cross-sectional study done by visiting the industrial units in person, completing questionnaires and analyzing the results. The questionnaire had 25 questions, including general information, the status of water supply, treatment and consumption, wastewater production, reuse or discharge of produced wastewater and the status of wastewater treatment and discharge of effluent. The industrial units evaluated were active with over 50 personnel and numbered 44 in total. Results: The water suppliers in the industries included network (70.5%, network and reverse osmosis (RO (22.5%, network and tanker (2.4% and tanker (4.6%. 63.63% of the industries had water treatment systems. 19.5% reused wastewater and 31.8% performed pretreatment before discharge of wastewater. The discharge sites of water treatment units’ effluent included the absorption well (17%, greenbelt (18% and sewer (65%. Discharge sites of sanitary wastewater in 50% of the industries was sewer and in 50%, it was absorption well. The discharge sites of processed wastewater was reuse (2%, sewer (52% and absorption well (46%. Discharge sites of exiting effluent from pretreatment units in the industrial park, included sewer (85.5%, transport by tanker (7.1% and absorption well (7.1%. The type of pretreatment process in 35.7% of the industries was chemical and in 64.3%, it was septic tank. Conclusion: The results of this study showed that pre-treatment is not done in most industries and wastewater reuse is performed in few industries. The main method of wastewater disposal in industries was by discharge into the sewer and absorbent well.

  18. Planning of mobility and parking. The acting of the Urban Mobility Plan Pianificazione delle mobilità e sosta. L’attuazione del Piano Urbano di Mobilità

    Directory of Open Access Journals (Sweden)

    Giuseppe Mazzeo

    2009-05-01

    overall rationalization and development of networks and vehicles. The paper deepens the characters of this tool, starting from the legislative forecasts, and thereafter on the basis of case-studies. The first part analyses the notions connected with the urban structure, the mobility and the parking system. In the second step the prescriptive aspects are analyzed: the Urban Mobility Plan and the Urban Parking Program are deepen in relation with their main aspects and in relation whit the parking problems. The third part analyses two case-studies; the cases highlights the different application philosophy, in particular for the connection between urban areas and parking system. At least, in the fourth part, are analyzed techniques and tools for solving the parking’ problem, the different modalities for its organization and the management techniques aimed at encouraging more correct behaviors in relation to the different urban areas.Il sistema della mobilità in area urbana è strategico per il funzionamento di qualunque città. Esso è composto da un sistema di parti e di funzioni interrelate strettamente con il territorio di riferimento; tra queste funzioni la sosta rappresenta un’attività primaria e la sua organizzazione e pianificazione un punto nodale di una corretta pianificazione della mobilità: questo a causa, principalmente, della sua caratteristica fondamentale, ossia l’essere attrattore di flussi veicolari. La scelta dei siti dove localizzare le strutture per la sosta e la determinazione delle relative caratteristiche gestionali va effettuata con una particolare attenzione agli impatti sulla organizzazione e sulla vivibilità della città stessa, il che si traduce in una stretta connessione con la pianificazione urbanistica e in una considerazione profonda dei caratteri morfologici delle diverse parti che compongono la città. Diversi sono gli strumenti di programmazione del sistema della mobilità e, al suo interno, della sosta. Il Piano Urbano della

  19. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  20. Model-centered approach to early planning and design of an eco-industrial park around an oil refinery.

    Science.gov (United States)

    Zhang, Xiangping; Strømman, Anders H; Solli, Christian; Hertwich, Edgar G

    2008-07-01

    Industrial symbiosis promises environmental and economic gains through a utilization of the waste of some processes as a resource for other processes. Because of the costs and difficulties of transporting some wastes, the largest theoretical potential for industrial symbiosis is given when facilities are colocated in an eco-industrial park (EIP). This study proposes a model-centered approach with an eight-step procedure for the early planning and design of an eco-industrial park considering technical and environmental factors. Chemical process simulation software was used to model the energy and material flows among the prospective members and to quantify the benefits of integration among different firms in terms of energy and resources saved as compared to a reference situation. Process simulation was based on a combination of physical models of industrial processes and empirical models. The modeling allows for the development and evaluation of different collaboration opportunities and configurations. It also enables testing chosen configurations under hypothetical situations or external conditions. We present a case study around an existing oil and gas refinery in Mongstad, Norway. We used the approach to propose the colocation of a number of industrial facilities around the refinery, focused on integrating energy use among the facilities. An EIP with six main members was designed and simulated, matching new hypothetical members in size to the existing operations, modeling material and energy flows in the EIP, and assessing these in terms of carbon and hydrogen flows.

  1. The Impact of Lecture Capture Presentations in a Distributed Learning Environment in Parks, Recreation, and Tourism Management

    Science.gov (United States)

    Vassar, Penny; Havice, Pamela A.; Havice, William L.; Brookover, Robert, IV

    2015-01-01

    Lecture capture technology allows instructors to record presentations and make them available to their students digitally. This study examined one program's implementation of lecture capture. Participants were undergraduate college students enrolled in Parks, Recreation, and Tourism Management courses at a public land grant university in the…

  2. “Frontload” in complex project program management to aim for lifetime sustainability of offshore windmill parks

    DEFF Research Database (Denmark)

    Brink, Tove

    2015-01-01

    This paper reveals how project program management can aim for lifetime sustainability of offshore windmill parks through innovation. The research is based on a qualitative focus group interview with 11 enterprises and 6 individual semi-constructed interviews with 6 enterprises. Offshore windmill...

  3. Conservation implications of forest changes caused by bark beetle management in the Šumava National Park

    Czech Academy of Sciences Publication Activity Database

    Zýval, V.; Křenová, Zdeňka; Kindlmann, Pavel

    2016-01-01

    Roč. 204, part B (2016), s. 394-402 ISSN 0006-3207 R&D Projects: GA MŠk(CZ) LO1415 Institutional support: RVO:67179843 Keywords : Natura 2000 * Forest ecosystem management * Natural disturbances * Bark beetles * National park conservation policy Subject RIV: EH - Ecology, Behaviour Impact factor: 4.022, year: 2016

  4. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  5. A Novel Location-Centric IoT-Cloud Based On-Street Car Parking Violation Management System in Smart Cities

    OpenAIRE

    Dinh, Thanh; Kim, Younghan

    2016-01-01

    Nowadays, in big cities, parking management is a critical issue from both the driver’s side and the city government’s side. From the driver’s side, how to find an available parking lot in a city is a considerable concern. As a result, smart parking systems recently have received great interest, both in academia and industry. From the city government’s side, how to manage and distribute such a limited public parking resource efficiently to give every visitor a fair chance of finding an on-stre...

  6. Economics, modeling, planning and management of energy

    International Nuclear Information System (INIS)

    Rogner, H.H.; Khan, A.M.; Furlan, G.

    1989-01-01

    The Workshop attended by 89 participants from 40 countries aimed to provide participants with an overview of global and regional issues and to familiarize them with analytical tools and modeling techniques appropriate for the analysis and planning of national energy systems. Emphasis was placed on energy-economy-interaction, modelling for balancing energy demand and supply, technical-economic evaluation of energy supply alternatives and energy demand management. This volume presents some of the lectures delivered at the Workshop. The material has been organized in five parts under the headings General Review of Current Energy Trends, Energy and Technology Menu, Basic Analytical Approaches, Energy Modeling and Planning, and Energy Management and Policy. A separate abstract was prepared for each of the lectures presented. Refs, figs and tabs

  7. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  8. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  9. Strategic plan for Hanford site information management

    International Nuclear Information System (INIS)

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site's decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE

  10. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  11. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  12. Planning and management of logistic cycle

    OpenAIRE

    V. N. Kudashkin

    2017-01-01

    We are considering planning and managing of logistic cycle, its impact on the content of the main processes that comprise the cycle to implement the order for the supply of material resources for industrial consumption, as well as its practical use, effectiveness, and prospects.This research paper is made on the basis of the information, received from textbooks and scientific literature of domestic and foreign authors, as well as from other sources. The main methods, used in this work are as ...

  13. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  14. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Rigsby V.P.

    2009-02-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement

  15. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  16. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  17. An observational study of defensible space in the neighbourhood park

    Science.gov (United States)

    Marzukhi, M. A.; Afiq, M. A.; Zaki, S. Ahmad; Ling, O. H. L.

    2018-02-01

    The planning of neighborhood park is important to provide space for interaction, leisure, and recreation among residents in any neighbourhood area. However, on an almost daily basis, newspapers report inappropriate incidents such as snatch theft, robbery and street attack that occurred in the neighborhood park. These cases reflect the significance of physical planning and design of neighborhood park that directly affect the safety and comfort of the users. Thus, this study attempts to engage with the defensible space concept in ensuring the security elements be applied in the planning of the recreational area. This study adopts a qualitative method form of research that is retrofitted to an observational study. The observational study is significant for revealing the condition of a neighbourhood park in the ‘real-world,’ in which direct observation is conducted on Taman Tasik Puchong Perdana. The observer focused on four elements or variables of defensible space concept including the provision of facilities in the neighborhood park, territoriality, surveillance, image and milieu. The findings revealed that the planning of Taman Tasik Puchong Perdana does not deliberate the defensible space elements, which may contribute to the crime activities in the park. In these circumstances, the planning of neighbourhood park needs to include proposals for the implementation of defensible space in response to the challenges underpinned by crime problems. Besides, the awareness among the residents needs to be emphasized with the support from local authorities and other organizations to manage and sustain the safety environment in the neighborhood park.

  18. Developing social standards for wilderness encounters in Mount Rainier National Park: Manager-defined versus visitor-defined standards

    Science.gov (United States)

    Kristopher J. Lah

    2000-01-01

    This research compared the differences found between manager-defined and visitor-defined social standards for wilderness encounters in Mount Rainier National Park. Social standards in recreation areas of public land are defined by what is acceptable to the public, in addition to the area’s management. Social standards for the encounter indicator in Mount Rainier’s...

  19. Medical technology management: from planning to application.

    Science.gov (United States)

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  20. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  1. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  2. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and ... environmental management plan of the eastern coasts of Mazandaran Province. ..... REFERENCE ... Department of oceanography, texas A&M university. An online textbook.

  3. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  4. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  5. Capturing the value of green space in urban parks in a sustainable urban planning and design context: pros and cons of hedonic pricing

    Directory of Open Access Journals (Sweden)

    Gustav Engström

    2017-06-01

    Full Text Available Sixty percent of the land that will be urban in 2030 has yet to be built. Contemporary urban development is unsustainable and focus is on building dense, often at the expense of urban green space (UGS, at the same time as our understanding of links between green spaces and human well-being, especially health, is increasing. There is a need to better understand and analyze human well-being qualities of UGS in a planning context. Our aim is to increase this understanding by analyzing the pros and cons of hedonic pricing in this context. Hedonic pricing is commonly used for analyzing benefits associated with UGS to make them more visible and to provide support for urban planning. However, the validity of this approach has been questioned. To increase the accuracy of a hedonic pricing method we incorporate state-of-the-art methods to assess the value of public parks in a case study. Although our results suggest that urban parks indeed have a positive effect on property value and that this effect tends to increase with reduced distance to the parks, the hedonic pricing information is not enough to make well-advised decisions in a sustainable planning context. We thus suggest (1 including and quantifying additional health benefit dimensions and (2 replacing straight-line measures with an axial line step distance measure, to better capture accessibility. To better capture the range of benefits generated by urban parks, irrespective of whether these benefits are enjoyed in direct relation to the park or not, we suggest complementing hedonic pricing via (3 applying an ecosystem service lens, thus also improving the accuracy of trade-off and synergy analysis Also, a sustainable planning approach will benefit from (4 taking the surrounding land use configuration into account for optimizing the different values of urban parks.

  6. National Ignition Facility Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, V.

    1997-09-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1{degree}C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  7. National Ignition Facility Site Management Plan

    International Nuclear Information System (INIS)

    Roberts, V.

    1997-01-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1 degree C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  8. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  9. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    Bončina, Andrej; Čavlović, Juro

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  10. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  11. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  12. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  13. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  14. 33 CFR 151.57 - Waste management plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Waste management plans. 151.57... Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.57 Waste management... follows the plan. (c) Each waste management plan under paragraph (b) of this section must be in writing...

  15. 76 FR 53149 - North American Waterfowl Management Plan

    Science.gov (United States)

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  16. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  17. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  18. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  19. Resource management plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Cunningham, M.; Pounds, L.; Oberholster, S.; Parr, P.; Mann, L.; Edwards, L.

    1993-08-01

    Rare plant species listed by state or federal agencies and found on or near the Department of Energy's Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated

  20. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  1. Exploration of Science Parks

    Institute of Scientific and Technical Information of China (English)

    Xiong Huibing; Sun Nengli

    2005-01-01

    Science parks have developed gready in the world, whereas empirical researches have showed that science parks based on linear model cannot guarantee the creation of innovation. Hi-tech innovation is derived from flow and management of information. The commercial and social interactions between in-parks and off-park firms and research institutions act as the key determinant for innovation.Industrial clustering is the rational choice for further developing Chinese science parks and solving some problems such as the lack of dear major industries and strong innovation sense, etc.

  2. Why travel motivations and socio-demographics matter in managing a National Park

    Directory of Open Access Journals (Sweden)

    Melville Saayman

    2009-06-01

    Full Text Available The Addo Elephant National Park is one of only a few national parks in the world that offers the Big 7 experience and is therefore one of South Africa’s prime tourism destinations. The park plays an important role in the regional economy and has become a hub for tourism development. The aim of this article is to determine the extent to which socio-demographic and behavioural and motivational indicators influence the spending of tourists to the park. A better understanding of the latter could help marketers and planners to increase the economic impact of the park. Since 2001, surveys have been conducted among tourists to the park and have included a number of socio-demographic, behavioural and motivational questions. In this analysis, 537 questionnaires were used. The methodology used includes factor analysis, cross-sectional regression analysis and pseudo-panel data analysis to determine and compare possible influences on spending. The research identifies six motives for tourists travelling to the Addo Elephant National Park; these are nature, activities, family and socialisation, escape, attractions and photography. The research found that a combination of socio-demographic and motivational factors influences visitor spending decisions. Added to this, the research confi rms that tourist attractions, including national parks, differ from one another and that the variables that influence spending therefore also differ.

  3. Balancing conservation management and tourism development with wilderness stewardship in the Kruger National Park, South Africa

    Science.gov (United States)

    F. J. (Freek) Venter

    2007-01-01

    The Kruger National Park (KNP) faces greatly amplified problems than was the case in the early 1900s when the KNP was established. Areas surrounding the park have experienced a human population explosion with a rapid expansion of farming areas and rural settlements. In the 1970s the KNP was fenced. Ecologically the KNP became an island and previous regional animal...

  4. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  5. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  6. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  7. Tools for valuing tree and park services

    Science.gov (United States)

    E.G. McPherson

    2010-01-01

    Arborists and urban foresters plan, design, construct, and manage trees and parks in cities throughout the world. These civic improvements create walkable, cool environments, save energy, reduce stormwater runoff, sequester carbon dioxide, and absorb air pollutants. The presence of trees and green spaces in cities is associated with increases in property values,...

  8. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  9. Forecasting distributional responses of limber pine to climate change at management-relevant scales in Rocky Mountain National Park.

    Directory of Open Access Journals (Sweden)

    William B Monahan

    Full Text Available Resource managers at parks and other protected areas are increasingly expected to factor climate change explicitly into their decision making frameworks. However, most protected areas are small relative to the geographic ranges of species being managed, so forecasts need to consider local adaptation and community dynamics that are correlated with climate and affect distributions inside protected area boundaries. Additionally, niche theory suggests that species' physiological capacities to respond to climate change may be underestimated when forecasts fail to consider the full breadth of climates occupied by the species rangewide. Here, using correlative species distribution models that contrast estimates of climatic sensitivity inferred from the two spatial extents, we quantify the response of limber pine (Pinus flexilis to climate change in Rocky Mountain National Park (Colorado, USA. Models are trained locally within the park where limber pine is the community dominant tree species, a distinct structural-compositional vegetation class of interest to managers, and also rangewide, as suggested by niche theory. Model forecasts through 2100 under two representative concentration pathways (RCP 4.5 and 8.5 W/m(2 show that the distribution of limber pine in the park is expected to move upslope in elevation, but changes in total and core patch area remain highly uncertain. Most of this uncertainty is biological, as magnitudes of projected change are considerably more variable between the two spatial extents used in model training than they are between RCPs, and novel future climates only affect local model predictions associated with RCP 8.5 after 2091. Combined, these results illustrate the importance of accounting for unknowns in species' climatic sensitivities when forecasting distributional scenarios that are used to inform management decisions. We discuss how our results for limber pine may be interpreted in the context of climate change

  10. Multi-criteria approval for evaluating landscape management strategies (Case study: Fruška Gora National Park

    Directory of Open Access Journals (Sweden)

    Lakićević Milena D.

    2015-01-01

    Full Text Available This paper deals with the problem of multi-criteria evaluation of four management strategies for Fruška Gora National Park. The criteria set was defined in ac­cordance with the IUCN guidelines for management of national parks. Four strategies were evaluated by testing preference intensities for each alternative with the respect to each cri­terion. Alternatives with preference above the approval threshold were approved, and a multi-criteria approval matrix was generated. According to the matrix, the most suitable management strategy was identified. It implies an intense protection of natural resources and landscape diversity in the national park by applying bio-engineering measures. This illustrative example proved that multi-criteria approval can be considered as a good deci­sion support tool when there is no need for a deeper insight into cardinal values of criteria weights and alternatives, or if the decision maker has to select few from many of alterna­tives to reduce the decision problem. For a more precise analysis, it is recommended to combine multi-criteria approval with other decision support tools, and future studies might deal with this problem in order to define an alternative framework for decision making in landscape management. [Projekat Ministarstva nauke Republike Srbije, br. 174003: Theory and application of analytic hierarchy process (AHP in multi-criteria decision making under conditions of risk and uncer­tainty (individual and group context

  11. Some aspects of identity, meaning and park sustainability research, with special reference to Kamenički park

    Directory of Open Access Journals (Sweden)

    Bajić Luka

    2011-01-01

    Full Text Available One of the main goals of urban planning by principles of sustainable development is the pursuit of diversity in structure, form and function in planning and design of urban public space. It is therefore necessary to redefine the concept and function of urban green areas and city parks, with the recommendation of identity preservation and promotion of social cohesion of this type of public space. In a theoretical sense, there is a problem of planning and designing urban parks in Serbia. This is due to failure to recognize the complexity underlying the possible role of urban public parks as an engine of urban renewal in the city or of any of his districts. Example of Kamenički park was chosen because of its complexity - in addition to being the largest green space in the city, this park also has high natural and cultural values (the park is protected as a cultural and natural heritage. The results indicate the reduced use of urban space. Based on existing theory and insights into the local planning process, general recommendations for improving its quality is the improvement of form/design of the park and it is necessary to define and promote the identity of space through the spatial analysis. The ultimate goal is to successfully respond to existing and potential customers' needs and thus define environmental, economic, cultural and social sustainability, which are key factors in managing the park.

  12. The Importance of Knowledge Management in Terms of Increasing Social Capital in Selected Slovene Technology Parks

    Directory of Open Access Journals (Sweden)

    Riko Novak

    2013-12-01

    Full Text Available This article investigates the importance of knowledge management (KM and how it is influencing social capital (SC in selected organisations that are members of Slovene technology parks. The purpose of this article is to point out statistical important characteristics between the dependant variable and several independent variables on the basis of preliminary studied empirical data based on a population of 667 organisations chosen from the subjects of the innovative environment database maintained by the Public Agency of the Republic of Slovenia for Entrepreneurship and Foreign Investments (JAPTI. On the basis of a multivariate regression analysis we wanted to present empirical findings, namely, whether communication technologies and the capability (ability of the employed to access information sources influences KM. With this article we want to present the final findings which define the development of a conceptual framework for understanding the influence of KM in small and medium sized companies on the development of social capital. We came to the conclusion that in an organisation the importance of intellectual and social capital, intangible capital assets and their continuous measurement has to be emphasised in order to increase the importance (awareness of KM.

  13. A master plan for the radwaste management

    International Nuclear Information System (INIS)

    Kim, Y.E.; Lee, S.H.; Lee, C.K.; Moon, S.H.; Sung, R.J.; Sung, K.W.

    1983-01-01

    The accumulated total amount of low-level radioactive wastes to be produced from operating power reactors and nuclear installations up until the year 2007 is estimated to 900,000 drum(approximately 200,000M 3 ). An effective master plan for the safe disposal of the wastes is necessary. Among many different disposal methods available for low-and medium-level radwastes, the engineered trench approach was chosen by an extensive feasibility study as the optimum method for Korea. Site selection, construction and commissioning of such a disposal facility are presumed to take two and a half years, beginning in July 1983. The total cost in opening the site and the unit disposal cost per drum were estimated to be 11 billion won and 40,000 won, respectively. An agency(KORDA) managing the operation of the disposal site is recommended to be established by 1987, assuming that the agency's economic feasibility can be justified by that time. When the disposal site is commissioned, a regulatory guide for ground disposal will be available, and supporting R and D work on the disposal site will be complete. Studies on the technology of radwaste treatment will continue through this period. For the longer term, staff training and future planning have been undertaken to ensure that a master plan, which can be expected to be used as a guideline for disposal of all radioactive waste arising, is fully adequate. (Author)

  14. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  15. Application of analytic hierarchy process in landscape management: Case study area Košutnjak park-forest

    Directory of Open Access Journals (Sweden)

    Lakićević Milena

    2011-01-01

    Full Text Available Proper management is one of key elements of the natural landscape protection strategy. Park-forests with protected and conserved natural elements represent attractive eco-tourism urban zones. Košutnjak is the most visited park-forest in Serbian capitol Belgrade, unfortunately with increasing number of degraded and devastated areas as a consequence of negative human impacts in the past. In order to conserve natural values in this popular forested city area, and to improve its tourism potential, we found that in achieving that goal, it is meaningful to asses possible management practices and identify the most desired one by applying the analytic hierarchy process (AHP, scientifically sound multi-criteria decision making tool. Based on the obtained results, a recommended strategy is to renovate natural vegetation and to promote recreational and tourism offer in Košutnjak with respect of the sustainability principle.

  16. Impacts of fire management on aboveground tree carbon stocks in Yosemite and Sequoia & Kings Canyon National Parks

    Science.gov (United States)

    Matchett, John R.; Lutz, James A.; Tarnay, Leland W.; Smith, Douglas G.; Becker, Kendall M.L.; Brooks, Matthew L.

    2015-01-01

    Forest biomass on Sierra Nevada landscapes constitutes one of the largest carbon stocks in California, and its stability is tightly linked to the factors driving fire regimes. Research suggests that fire suppression, logging, climate change, and present management practices in Sierra Nevada forests have altered historic patterns of landscape carbon storage, and over a century of fire suppression and the resulting accumulation in surface fuels have been implicated in contributing to recent increases in high severity, stand-replacing fires. For over 30 years, fire management at Yosemite (YOSE) and Sequoia & Kings Canyon (SEKI) national parks has led the nation in restoring fire to park landscapes; however, the impacts on the stability and magnitude of carbon stocks have not been thoroughly examined.

  17. Population Viability Analysis of the Endangered Roan Antelope in Ruma National Park, Kenya, and Implications for Management.

    Science.gov (United States)

    Kimanzi, Johnstone K

    2018-01-01

    Population viability analysis (PVA) was used to (1) establish causes of roan population decline for the past 30 years in Ruma National Park (RNP), the only park where wild roans remain in Kenya, and (2) predict the probability of roan persistence under existing and alternative management options. PVA was done using long-term data based on population dynamics, life history, climatic conditions, and expert knowledge. Poaching was identified as the main cause of roan decline in RNP. Several antipoaching and prioritized habitat management interventions to promote population recovery and sustainable conservation of roans are described. PVA predictions indicated that, without these interventions, the roan population cannot persist more than 3 decades. Furthermore, ensuring sustainable conservation of roans in RNP will boost tourism in Western Kenyan and thus alleviate poverty in this part of the country. Improved income from tourism will reduce the possible pressures from hunting and give greater incentives for local people to be actively engaged in roan conservation.

  18. Micro-Credit and Community Wildlife Management: Complementary Strategies to Improve Conservation Outcomes in Serengeti National Park, Tanzania

    Science.gov (United States)

    Kaaya, Emmanuel; Chapman, Margaret

    2017-09-01

    Community wildlife management programs in African protected areas aim to deliver livelihood and social benefits to local communities in order to bolster support for their conservation objectives. Most of these benefits are delivered at the community level. However, many local people are also seeking more individual or household-level livelihood benefits from community wildlife management programs because it is at this level that many of the costs of protected area conservation are borne. Because community wildlife management delivers few benefits at this level, support for their conservation objectives amongst local people often declines. The study investigated the implications of this for reducing poaching in Serengeti National Park, Tanzania. Three community wildlife management initiatives undertaken by Park management were compared with regard to their capacity to deliver the individual and household-level benefits sought by local people: community conservation services, wildlife management areas and community conservation banks. Interviews were carried out with poachers and local people from four villages in the Western Serengeti including members of village conservation banks, as well as a number of key informants. The results suggest that community conservation banks could, as a complementary strategy to existing community wildlife management programs, potentially provide a more effective means of reducing poaching in African protected areas than community wildlife management programs alone.

  19. How to Manage and Plan Terminology: Creating Management TDBs

    Directory of Open Access Journals (Sweden)

    Gordana Jakić

    2016-09-01

    Full Text Available Scientific and technical terminology represents a very topical issue in economically and technologically dependent countries with small languages such as Serbian. The current terminological problems in the Serbian language, especially in specialized areas that are experiencing dynamic development, are: Anglicization of the language for special purposes, underdeveloped and unstable terminology, and lack of adequate and modern terminological and lexical resources. On the one hand, the terminological problems listed above are of concern to subject-field specialists, since inadequate and non-existent terminology significantly affects the representation, transfer and management of specialized knowledge and information. On the other hand, terminology and language planners point to the growing need for immediate and systematic intervention aimed at terminology harmonization, consolidation and standardization. In spite of the awareness, there is no systematic approach to the solving of terminological problems in Serbian. In addition, practical activities regarding the collection and organization of terminology are few and reduced to individual initiatives. Under the paradigm of language planning (LP-oriented terminology management (2, this paper is going to address a practical activity of terminology management: the creation of a Serbian management terminology database (TDB with equivalent terms in English. The paper will discuss the methodology of terminology work, potential obstacles in termbase creation, as well as potential benefits that such a resource would have on all its potential users: management specialists and practitioners, professional translators, and language and terminology planners. A particular focus will be placed on the potential significance that this kind of a database would have for terminology policy and planning in the Serbian language, on the one hand, and knowledge transfer and management, on the other hand.

  20. The State of Water and Wastewater Management in the Municipalities of the Polesie National Park

    Directory of Open Access Journals (Sweden)

    Krzysztof Jóżwiakowski

    2017-11-01

    Full Text Available The aim of the work is to present the current state of water and wastewater management in the municipalities where the Polesie National Park (PNP is located. The PNP is situated in Lublin Voivodeship, in the area of six municipalities: Sosnowica, Hańsk, Urszulin, Stary Brus, Wierzbica and Ludwin. The data used in this paper, were obtained on the basis of the surveys conducted in these municipalities in 2016 by the Department of Environmental Engineering and Geodesy of the University of Life Sciences in Lublin. In the analyzed communes, there was a very large disproportion between the usage of sewerage and the water supply network. It has been shown that 79.1% of the inhabitants living in the afore-mentioned communes used the water supply network and only 22.5% of them used sewerage. In the discussed communities there are 9 collective, mechanical and biological wastewater treatment plants with a capacity of over 5 m3d-1. On the farms located in the scattered areas, which are not connected to the sewerage, wastewater is discharged mainly to the septic tanks. In four out of the six analyzed municipalities, there were 2345 septic tanks registered. Domestic sewage from some farms is purified in household wastewater treatment plants (395 pieces. The plants with the drainage systems are prevalent (84.9%, which may contribute to the groundwater quality degradation. In order to protect the natural environment within the communes that form the PNP, it is necessary to undertake the actions that will contribute to the improvement of the current state of water and wastewater management. While solving the existing problems related to water supply and wastewater treatment, it is strongly required to adhere to the principle of sustainable development and use highly effective systems in order to ensure that the ecological effects are appropriate.

  1. 75 FR 47026 - Cedar Creek and Belle Grove National Historical Park Advisory Commission; Notice of Public Meetings

    Science.gov (United States)

    2010-08-04

    ... who are interested in the Park, the development and implementation of the plan, or the business of the... discuss the development and implementation of the Park's general management plan. Date: September 16, 2010. Location: Warren County Government Center, 220 North Commerce Avenue, Front Royal, VA. Date: December 16...

  2. 76 FR 60080 - Cedar Creek and Belle Grove National Historical Park Advisory Commission; Notice of Public Meetings

    Science.gov (United States)

    2011-09-28

    ... discuss the implementation of the Park's general management plan. Date: December 15, 2011. Location.... Individuals who are interested in the Park, the implementation of the plan, or the business of the Advisory.... Location: Strasburg Town Hall Council Chambers, 174 East King Street, Strasburg, VA. Date: June 21, 2012...

  3. A Survey of Intelligent Car Parking System

    OpenAIRE

    Faheem; S.A. Mahmud; G.M. Khan; M. Rahman; H. Zafar

    2013-01-01

    The industrialization of the world, increase in population, slow paced city development and mismanagement of the available parking space has resulted in parking related problems. There is a dire need for a secure, intelligent, efficient and reliable system which can be used for searching the unoccupied parking facility, guidance towards the parking facility, negotiation of the parking fee, along with the proper management of the parking facility. Intelligent Parking Service is a part of Intel...

  4. Status and management of non-native plant invasion in three of the largest national parks in the United States

    Directory of Open Access Journals (Sweden)

    Scott Abella

    2015-06-01

    Full Text Available Globally, invasion by non-native plants threatens resources that nature reserves are designated to protect. We assessed the status of non-native plant invasion on 1,662, 0.1-ha plots in Death Valley National Park, Mojave National Preserve, and Lake Mead National Recreation Area. These parks comprise 2.5 million ha, 23% of the national park land in the contiguous USA. At least one non-native species inhabited 82% of plots. Thirty-one percent of plots contained one non-native species, 30% two, 17% three, and 4% four to ten non-native species. Red brome (Bromus rubens, an ‘ecosystem engineer’ that alters fire regimes, was most widespread, infesting 60% of plots. By identifying frequency of species through this assessment, early detection and treatment can target infrequent species or minimally invaded sites, while containment strategies could focus on established invaders. We further compared two existing systems for prioritizing species for management and found that a third of species on plots had no rankings available. Moreover, rankings did not always agree between ranking systems for species that were ranked. Presence of multiple non-native species complicates treatment, and while we found that 40% of plots contained both forb and grass invaders, exploiting accelerated phenology of non-natives (compared to native annuals might help manage multi-species invasions. Large sizes of these parks and scale of invasion are formidable challenges for management. Yet, precisely because of their size, these reserves represent opportunities to conserve large landscapes of native species by managing non-native plant invasions.

  5. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  6. 75 FR 57058 - Oregon Parks and Recreation Department Habitat Conservation Plan Along the Pacific Coast in...

    Science.gov (United States)

    2010-09-17

    ..., Newport, OR 97365; South Tillamook Branch Library, 6200 Camp St., Pacific City, OR 97135; Port Orford Public Library, 555 W. 20th St., Port Orford, Oregon 97465; Reedsport Branch Library, 395 Winchester Ave... Use e. Other Dry Sand Activities 2. Beach Management a. Public Safety b. Law Enforcement c. Boat and...

  7. An outline of economic impacts of management options for Šumava National Park

    Czech Academy of Sciences Publication Activity Database

    Dickie, I.; Whiteley, G.; Kindlmann, Pavel; Křenová, Zdeňka; Bláha, J.

    2014-01-01

    Roč. 4, č. 1 (2014), s. 5-29 ISSN 1805-0174 Institutional support: RVO:67179843 Keywords : Šumava National Park * socio-economic analysis * Wild Heart of Europe Subject RIV: EH - Ecology, Behaviour

  8. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  9. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  10. Model of Ecotourism Management in Small Islands of Bunaken National Park, North Sulawesi

    OpenAIRE

    Munandar, Aris; Kholil, Kholil; Djokosetiyanto, Daniel; Tangian, Diane

    2015-01-01

    The Bunaken National Park is one of the famous national park for tourism in North Sulawesi, Indonesia. The abundance natural resources is one of the crucial natural attraction for tourism in Bunaken. Tourism in Bunaken contributes significantly in local economic development. In the same situation, however, tourism contributes negatively to environment. Tourist activities contributes significantly in coral reef covers. Utilization of natural resources as an object and attraction needs to be do...

  11. Measures for Management of Land Use Master Plan Released

    Institute of Scientific and Technical Information of China (English)

    Qian Fang; Li Caige

    2017-01-01

    On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,

  12. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  13. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  14. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  15. Neutralized current acid waste consolidation management plan

    International Nuclear Information System (INIS)

    Powell, W.J.; Brown, R.G.; Galbraith, J.; Jensen, C.; Place, D.E.; Reddick, G.W.; Zuroff, W.; Brothers, A.J.

    1996-01-01

    The scope of this evaluation is to recommend a management plan for the high-heat tank waste, including neutralized current acid waste (NCAW) in AY and AZ Tank Farms, and tank C-106 waste. The movement of solids, liquids and salt cake in the designated tank farms is included. Decision analysis techniques were used to determine a recommended alternative. The recommended course of action was replacement of a 75-hp mixer pump in tank AY-102 and in-tank concentration of tank AZ-102 supernate. The alternative includes transfer fo tank C-106 sludge to tank AY-102, then transfer to tank AY-102 and tank C-106 sludge to tank AZ-101 using the new 75-hp mixer pump installed in tank AY-102. Tank AZ-101 becomes a storage tank for high-level waste (HLW) sludge, with the capacity to mix and transfer sludge as desired

  16. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES and H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES and H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March

  17. Configuration management plan for the GENII software

    International Nuclear Information System (INIS)

    Rittmann, P.D.

    1994-01-01

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user's input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user's input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user's guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan

  18. The flood risk management plan: towards spatial water governance

    NARCIS (Netherlands)

    Hartmann, T.; Driessen, P.

    2017-01-01

    The flood risk management plan challenges both water engineers and spatial planners. It calls for a new mode of governance for flood risk management. This contribution analyses how this mode of governance distinguishes from prevalent approaches. Spatial planning and water management in Europe are

  19. Old Hickory Lake Appendix M To Park Management Shoreline Management Plan

    Science.gov (United States)

    2014-07-01

    attractors, establishment of nesting/forage habitat such as monarch butterfly way stations, construction of chimney swift towers, etc. 22. Leases...Elaeagnus umbellata Thunb.) Japanese Bush honeysuckles (Lonicera japonica.) Amur Bush honeysuckle (Lonicera maackii.) Marrows Bush honeysuckle (Lonicera

  20. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  1. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    Science.gov (United States)

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  2. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  3. PEMODELAN SISTEM PENGUSAHAAN WISATA ALAM DI TAMAN NASIONAL GUNUNG CIREMAI, JAWA BARAT (Modelling of Nature Tourism Management System in Gunung Ciremai National Park, West Java

    Directory of Open Access Journals (Sweden)

    Ai Yuniarsih

    2014-10-01

    The utilization of national park’s natural resources which is limited on nature tourism and environmental services needs proper management plan that can meet the ecological goal and socio-economical goal. Therefore this research aimed to build the model of Gunung Ciremai National Park (TNGC natural resources utility development which could reach the ecological’s goal and socio-economical’s goal. Method used in this research was Dynamic Sistem Analysis with STELLA 9.02 software. Based on the previous study, nature tourism management was the prioritized activity chosen by the community.  Result of the simulation based on the recent condition showed that if there was not change in key variables for  the next ten years, there was   increase in tourist number, community income and government income, but decrease in forest cover which only reached 46.63 % of the TNGC area. Simulation with development scenario showed the significant increase in tourist number, community income and government income and the forest cover reached 68.64 % of TNGC area. The nature tourism management model was very influenced by stakeholders’ role, especially in managing promotion, restoration, forest protection, tourism site quality improvement and accesibilities, improving TNGC’s human resources capacity and competency, and  increasing community participation in the management.

  4. Management Training of Sumatra Elephant (Elephas maximus sumatranus and Daily Behavior in Flying Squad WWF Tesso Nilo National Park, Riau

    Directory of Open Access Journals (Sweden)

    Arum Ratnasari

    2018-01-01

    Full Text Available Flying squad is an established strategy in the effort to resolve the conflict elephants in Tesso Nilo National Park. Flying squad utilizes trainedelephants to chase away wild elephants that come out the national park area. The study aims to identify management training and daily behavior ofSumatran elephant. The study was conducted in the Flying Squad WWF's Tesso Nilo National Park, Riau in March-April 2016 using focal animalsampling and interview. The elephant training curriculum consist of basic training, advanced training and exercise development by combined verbalcommands, visual, and physical. The measured success of training will be seen if the elephants could perform mahout’s commands without any error.Percentage of ingestive behavior showed the highest value at noon, while percentage of shelter seeking and other behavior showed the highest valueat night. It caused the elephants do more displacement to get the food at noon.Keywords: daily behavior, flying squad, focal animal sampling, sumatran elephant, training management

  5. Community participation in fire management planning: The Trinity county fire safe council's fire plan

    Science.gov (United States)

    Yvonne Everett

    2008-01-01

    In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...

  6. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  7. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  8. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  9. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  10. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  11. Planning and management of logistic cycle

    Directory of Open Access Journals (Sweden)

    V. N. Kudashkin

    2017-01-01

    Full Text Available We are considering planning and managing of logistic cycle, its impact on the content of the main processes that comprise the cycle to implement the order for the supply of material resources for industrial consumption, as well as its practical use, effectiveness, and prospects.This research paper is made on the basis of the information, received from textbooks and scientific literature of domestic and foreign authors, as well as from other sources. The main methods, used in this work are as follows: method of system analysis, method of the theory of operations’ research, prognostics. Application of these methods allows forecasting material flows, creating the integrated management systems and controlling their movements, developing systems of logistic service, to optimize supply stock and solve a number of other tasks.A logistic approach to form a modern system of logistics will save time, reduce costs for the purchase of material resources, their delivery and storage.In modern conditions of the market economy, the considered time parameters of the logistic chain are essential for manufacturing enterprises because their records significantly increase the efficiency of the logistical system.Logistics is equipped with a special complex of economic and mathematical models, the main feature of which is the adaptability, i.e. ability to solve complex optimization problems in the operational mode and in the process of the management of material flows. The primary role of these models in a market economy is to identify quickly points of compromise.Dynamics to functional cycles gives the necessity to align resource needs «input» and «output». «Input» functional cycle is an order that specifies requirements for a product or service. Logistical system, which is able to complete fully the order of any size, as a rule, needs in the «combined» functional cycles, including different transactions and operations at different stages. The «output» of

  12. Urban Land Use Classifcation Linked to Planning Management

    Institute of Scientific and Technical Information of China (English)

    QI Dongjin; ZHOU Jianyun; SHI Ke

    2012-01-01

    By analyzing the applicability of the new Code for Classification of Urban Land Use and Planning Standards of Development Land from the angle of planning management,this paper points out the conflicts between the planning and land use management institutions.Referring to the experience of land use control in the US and the UK through zoning and case law respectively,this paper puts forward that the urban land use classification should take into consideration the characteristics of the actual urban planning system and the possibility of mixed land use due to the uncertainty of urban development,and be linked to the institutions of planning and land supply management.

  13. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  14. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Lesson PlanningTask 1As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need tobe included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasonswhy we need to plan our lessons.

  15. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Lesson Planning Task 1 As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need to be included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasons why we need to plan our lessons.

  16. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  17. Evaluation of Integrating the Invasive Species Forecasting System to Support National Park Service Decisions on Fire Management Activities and Invasive Plant Species Control

    Science.gov (United States)

    Ma, Peter; Morisette, T.; Rodman, Ann; McClure, Craig; Pedelty, Jeff; Benson, Nate; Paintner, Kara; Most, Neal; Ullah, Asad; Cai, Weijie; hide

    2007-01-01

    The USGS and NASA, in conjunction with Colorado State University, George Mason University and other partners, have developed the Invasive Species Forecasting System (ISFS), a flexible tool that capitalizes on NASA's remote sensing resource to produce dynamic habitat maps of invasive terrestrial plant species across the United States. In 2006 ISFS was adopted to generate predictive invasive habitat maps to benefit noxious plant and fire management teams in three major National Park systems: The Greater Yellowstone Area (Yellowstone / Grand Tetons National Parks), Sequoia and Kings Canyon National Park, and interior Alaskan (between Denali, Gates of The Arctic and Yukon-Charley). One of the objectives of this study is to explore how the ISFS enhances decision support apparatus in use by National Park management teams. The first step with each park system was to work closely with park managers to select top-priority invasive species. Specific species were chosen for each study area based on management priorities, availability of observational data, and their potential for invasion after fire disturbances. Once focal species were selected, sources of presence/absence data were collected from previous surveys for each species in and around the Parks. Using logistic regression to couple presence/absence points with environmental data layers, the first round of ISFS habitat suitability maps were generated for each National Park system and presented during park visits over the summer of 2006. This first engagement provided a demonstration of what the park service can expect from ISFS and initiated the ongoing dialog on how the parks can best utilized the system to enhance their decisions related to invasive species control. During the park visits it was discovered that separate "expert opinion" maps would provide a valuable baseline to compare against the ISFS model output. Opinion maps are a means of spatially representing qualitative knowledge into a quantitative two

  18. Public acceptance of management actions and judgments of responsibility for the wolves of the southern Greater Yellowstone Area: Report to Grand Teton National Park

    Science.gov (United States)

    Taylor, Jonathan G.; Johnson, S. Shea; Shelby, Lori B.

    2005-01-01

    . After delisting, state Fish and Wildlife Services in Montana, Idaho, and Wyoming will be responsible for managing wolves. Each state must submit a wolf management plan to the USFWS which then must be approved before management shifts occur. As of this writing, the process of delisting the wolves in the state of Wyoming is ongoing. However, the reclassification of wolves nationwide was completed on April 1, 2003. Wolves outside of YNP changed in status from endangered to threatened. The wolves classified in the experimental nonessential population did not change in status (USFWS and others, 2004). This classification of experimental nonessential population allows for flexibility in management decisions concerning the wolves (Smith and others, 2004). For example, control actions in the GYA included trapping and radio-collaring four wolves; intensive monitoring; increasing riders on grazing allotments; harassing wolves with rubber bullets, cracker shells, and lights; moving livestock to different pastures; and issuing four shoot on-sight permits. When non-lethal control methods were not effective, wolves were killed in an attempt to prevent further livestock depredations (USFWS and others, 2004; Table 1). At the same time that wolf numbers are rising, human population statistics in the GRTE area are also rising. The population of Teton County, Wyoming in 1990 was just over 11,000 people; today that number has increased to approximately 19,000 (U.S. Census Bureau, 2005). park visitation for GRTE has been substantial over the last several years with an average visitation of 2.5 million visitors (NPS, 2004a). Furthermore, land ownership surrounding GRTE and the establishment of grazing rights within park boundaries are problem areas for wolf-human interactions due to livestock depredation. With increasing numbers of visitors, residents, and livestock it is reasonable to assume that conflicts are going to increase also. In 1950, GRTE was expanded to in

  19. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  20. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained