WorldWideScience

Sample records for palo verde-5 reactor

  1. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  2. Remote handling and robotic inspections of Palo Verde reactor vessel internals

    International Nuclear Information System (INIS)

    Ryder, W.

    1998-01-01

    Remote visual examinations and handling evolutions in high radiation field environments have required the use of radiation tolerant video systems. These systems involve significant expense and potentially require large envelope deployment structures. Recent events at Palo Verde including Upper Guide Structure damage and Reactor Vessel In-Service Inspections have provided opportunities for research, design and utilization of alternative approaches. Most significant of these, utilization of CCD modules with high magnification capabilities, have produced higher quality viewing, reduced maintenance expenditures, and rapid deployment intervals. (orig.) [de

  3. Search for neutrino oscillations at the palo verde nuclear reactors

    Science.gov (United States)

    Boehm; Busenitz; Cook; Gratta; Henrikson; Kornis; Lawrence; Lee; McKinny; Miller; Novikov; Piepke; Ritchie; Tracy; Vogel; Wang; Wolf

    2000-04-24

    We report on the initial results from a measurement of the antineutrino flux and spectrum at a distance of about 800 m from the three reactors of the Palo Verde Nuclear Generating Station using a segmented gadolinium-loaded scintillation detector. We find that the antineutrino flux agrees with that predicted in the absence of oscillations excluding at 90% C.L. nu;(e)-nu;(x) oscillations with Deltam(2)>1.12x10(-3) eV(2) for maximal mixing and sin (2)2straight theta>0.21 for large Deltam(2). Our results support the conclusion that the atmospheric neutrino oscillations observed by Super-Kamiokande do not involve nu(e).

  4. Palo Verde nuclear dynamic analysis (PANDA)

    International Nuclear Information System (INIS)

    Girjashankar, P.V.; Secker, P.A. Jr.; LeClair, S.J.; Mendoza, J.; Webb, J.R.

    1988-01-01

    Arizona Nuclear Power Project (ANPP) has initiated the development of a large scale dynamic analysis computer program for the Palo Verde Nuclear Generating Station (PVNGS). This paper presents the decision processes and preliminary development activities that have been pursued related to the code development. The PANDA (Palo Verde Nuclear Dynamic Analysis) code will be used for a variety of applications as described in this paper

  5. Palo Verde College Facts, 2001.

    Science.gov (United States)

    Palo Verde Coll., Blythe, CA.

    This is a 2001 report on Palo Verde College (PVC) (California) student demographics, enrollment status, citizenship, educational goals, and academic persistence. Student data were collected and analyzed to meet accrediting standards, improve institutional effectiveness, and fulfill the local district's mission. The report discusses enrollment…

  6. Experience with reactor power cutback system at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Chari, D.R.; Rec, J.R.; Simoni, L.P.; Eimar, R.L.; Sowers, G.W.

    1987-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit site which illustrates System 80 nuclear steam supply system (NSSS) design. The System 80 NSSS is the Combustion Engineering (C-E) standard design rated at 3817 Mwth. PVNGS Units 1 and 2 achieved commercial operation on February 13, 1986 and September 22, 1986, respectively, while Unit 3 has a forecast date for commercial operation in the third quarter of 1987. The System 80 design incorporates a reactor power cutback system (RPCS) feature which reduces plant trips caused by two common initiating events: loss of load/turbine trip (LOL) and loss of one main feedwater pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety system

  7. Achieving engineering excellence at Palo Verde

    International Nuclear Information System (INIS)

    Prawlocki, F.C.

    1989-01-01

    Early in 1988, the management of the newly formed Palo Verde Nuclear Generating Station (PVNGS) Engineering and Construction Division was faced with a dilemma: how to build a competent, confident, efficient engineering organization in the face of increasing requirements and tightened fiscal controls. This paper discusses steps taken by Palo Verde to address actions taken to effect a smooth transition from construction to operations and the development of the Engineering Excellence Program. The Engineering Excellence Program will continue to evolve over time as the number of the NED's [Nuclear Engineering Department] personnel grown and processes are changed over the course of the next few years. As tasks from the Engineering Excellence Program action plan are completed, the results achieved are expected to be integrated into the routine business of the NED

  8. 75 FR 52045 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental...

    Science.gov (United States)

    2010-08-24

    ... Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental Assessment and Finding of No.... NPF-74, issued to Arizona Public Service Company (APS, the licensee), for operation of Palo Verde... Statement for the Palo Verde Nuclear Generating Station, NUREG-0841, dated February 1982. Agencies and...

  9. Burrowing Owl - Palo Verde Valley [ds197

    Data.gov (United States)

    California Natural Resource Agency — These burrowing owl observations were collected during the spring and early summer of 1976 in the Palo Verde Valley, eastern Riverside County, California. This is an...

  10. Living With Parasites in Palo Verde National Park

    Directory of Open Access Journals (Sweden)

    Eben Kirksey

    2012-11-01

    Full Text Available Bruno Latour has tried to bring a parliamentary democracy to the domain of nature. Wading through the swamps of Palo Verde, a national park in the Guanacaste Province of Costa Rica, and wandering onto neighbouring agricultural lands, I failed to find a central place where people were speaking for nature. Departing from a failed attempt to speak for another species (the fringe-toed foam frog, this paper considers how diverging values and obligations shape relationships in multi-species worlds. As spokespersons articulated competing visions of nature on the borderlands of Palo Verde, multiple social and ecological worlds went to war. The haunting specter of capital joined the fray—animating the movements of cattle, grasses with animal rhizomes, rice seeds, and flighty ducks across national borders and through fragmented landscapes. Amidst this warfare, the fringe-toed foam frog was just one tenacious parasite, a noisy agent eating at the table of another, which began to flourish in worlds designed with the well-being of others in mind. Cattails, charismatic birds, and a multitude of insects began interrupting human dreams and schemes. Final solutions to the problem of living with parasites failed in Palo Verde. Humans and parasites, who became para-selves of one another, maintained an abiding presence in the landscape.

  11. 75 FR 48323 - Agency Information Collection Activities; Proposed Collection; Comment Request; Palos Verdes...

    Science.gov (United States)

    2010-08-10

    ..., quantity, and/or cooking method of fish species, (3) gather quantitative data that can be used to... anglers who fish in the Palos Verdes Shelf vicinity. Title: Palos Verdes Shelf Seafood Consumption Survey... deep for direct human contact; however, fish in the PV Shelf area bioaccumulate the contaminants...

  12. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Science.gov (United States)

    2011-04-29

    ... Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice of Issuance of Renewed... Company (licensee), the operator of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS... Plants: Supplement 43, Regarding Palo Verde Nuclear Generating Station,'' issued January 2011, discusses...

  13. Capturing the design bases on Palo Verde

    International Nuclear Information System (INIS)

    Rogers, A.C.; Prawlocki, F.C.

    1989-01-01

    Over the past several years, the nuclear power industry has been directing considerable attention to plant configuration control. Utilities have been put in difficult situations due to changes made in plants without full original design basis knowledge. Once a plant is constructed, there is often insufficient information from the reactor designer or the architect/engineer to properly support operations, especially changes to the plant. In many cases utilities do not know the design bases for their units. As a result of these concerns, many utilities have been searching for ways to define the appropriate design bases for their plant. This paper discusses steps taken by Palo Verde to produce a design bases document and how it is being used to support the operation of the three nuclear units

  14. Deposition and Accumulation of Emerging Contaminants in the Sediments of the Palos Verde Shelf, California

    Science.gov (United States)

    Deposition and Accumulation of Emerging Contaminants in the Sediments of the Palos Verde Shelf, California Mark G. Cantwell, David R. Katz, Julia Sullivan, Robert P. Eganhouse, Monique M. Perron, Robert M. Burgess The Palos Verdes shelf is located off the Southern California coa...

  15. Palo Verde nuclear generating station EASEplus SIMULATE model

    International Nuclear Information System (INIS)

    McDonald, W.F.; Reed, M.L.; Fauste, J.L.

    1992-01-01

    The Palo Verde on-site reactor engineers have an extremely powerful and accurate tool for quickly predicting the effects of reactor power maneuvers on core axial shape index (ASI) and xenon worth. They can analyze postulated future power maneuvers quickly and supply the reactor operators with valuable predictions without having to consult with the off-site nuclear analysis group. The tool developed by the nuclear analysis group was an advanced nodal code with a graphic user interface (GUI) driver for ease of use. The advanced nodal code used was the Studsvik of America SIMULATE-3 Version 2.20-DSI. This SIMULATE version was compiled for use on a personal computer (PC) with a Definicon Systems' 50-MHz coprocessor board. The GUI face used was Expert-EASE Systems' EASE+SIM3 Version 3.0 pre-/postprocessor. The system was installed on Compaq Deskpro 386/20e PCs located in the control room of each of the three units, in the reactor engineering office, in the nuclear analysis office, and in the control room of the training simulator

  16. How Palo Verde saved millions of dollars

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    In autumn 1992, Arizona Public Service adopted new project control procedures for outages at its three-unit Palo Verde PWR site, including: the switch to a PC-based environment; a new scheduling system; and the generation of improved graphics for decision making. Major cost savings were made and three further outages have now benefitted from the new systems. (author)

  17. 76 FR 1197 - Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of...

    Science.gov (United States)

    2011-01-07

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-528, 50-529, 50-530; NRC-2009-0012] Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of the Final Supplement 43... of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the...

  18. Auxiliary feedwater system risk-based inspection guide for the Palo Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Sloan, J.A.

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Palo Verde was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Palo Verde plants

  19. Palo Verde receives new control room simulator

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    A new control room simulator was delivered to Arizona Public Service Company's Palo Verde nuclear generating station in late August. The system, the second simulator on site, will be used for training beginning in January 1994, said David C. Brown, manager of the simulator upgrade project. Having two simulators will ease the current tight training schedule, and allow expansion of instruction to personnel other than licensed operators

  20. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-22

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-528, STN 50-529, and STN 50-530; NRC-2010-0114] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde...

  1. Technical specifications, Palo Verde Nuclear Generating Station, Unit No. 2 (Docket No. 50-529). Appendix A to License No. NPF-51

    International Nuclear Information System (INIS)

    1986-04-01

    Information is presented concerning the technical specifications for the Palo Verde-2 Reactor. Areas of interest discussed in this report include: safety limits and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls. 19 figs., 62 tabs

  2. Options for In Situ Capping of Palos Verdes Shelf Contaminated Sediments

    National Research Council Canada - National Science Library

    Palermo, Michael; Schroeder, Paul; Rivera, Yilda; Ruiz, Carlos; Clarke, Doug; Gailani, Joe; Clausner, James; Hynes, Mary; Fredette, Thomas; Tardy, Barbara

    1999-01-01

    The U.S. Army Engineer Waterways Experiment Station (WES) has performed an evaluation of in situ capping options for sediment restoration of DDT and PCB contaminated sediments on the Palos Verdes (PV...

  3. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-01-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an 'expert panel.' The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC's increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the open-quotes expert panelclose quotes and outside of the IST program to determine whether additional testing requirements are appropriate

  4. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    Energy Technology Data Exchange (ETDEWEB)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-12-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an `expert panel.` The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC`s increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the {open_quotes}expert panel{close_quotes} and outside of the IST program to determine whether additional testing requirements are appropriate.

  5. Assessment of vibration anomalies of main steam lines at Palo Verde-3

    International Nuclear Information System (INIS)

    Amr, A.; Landstrom, C.; Maxwell, H.; Miller, J.S.; Lynch, J.J.

    1996-01-01

    Historically, flow induced vibration in piping systems that transport liquid has presented problems for plant designers. When evaluating a vibration problem, it is always important to determine the forcing frequencies from different phenomena and the natural frequencies of the system as an integral part of establishing the root cause of the problem. Since in most cases of large vibration and noise levels, the natural frequency of the system and the frequency of the flow induced vibration are very close, determining the natural frequency of the system is important. Palo Verde Unit-3 exhibited a vibration problem where identification of the root cause was difficult. A Palo Verde team was created which consisted of engineers from different on-site departments and support from consultants. The process used to determine the root cause for the vibration/noise problem on Main Steam Supply System (MSSS) steam line 2 at Palo Verde Unit 3 is discussed in this paper. Since the root cause was not readily apparent, a finite element model was constructed to determine the natural frequency of the piping system. The finite element model consisted of a portion of the main steam lines, including a sample line which traverses the main steam line

  6. 75 FR 8149 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-02-23

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3... NPF-74, issued to the Arizona Public Service Company (APS, or the licensee), for operation of the Palo Verde Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively, located in...

  7. Decontamination and disposal of Sb-124 at Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Miller, A.D.; Hillmer, T.P.; Kester, J.W.; Hensch, J.R.

    1988-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit Combustion Engineering pressurized water reactor site. Each unit consists of an identical, self contained 1270 MWe reactor. This standardized design allows sharing of design improvements and equipment leading to optimum operation of the individual units. One design improvement, identified early into the operation of Unit 1, involved the elemental antimony content of the seals and bearings within the reactor coolant pumps. Normal wear of these components releases small amounts of elemental antimony. This antimony in turn deposits on in-core surfaces and activates to produce the isotopes Sb-122 and Sb-124. These isotopes emit highly energetic gamma rays which contribute significantly to the exposure and radwaste disposal charges at PVNGS. For these reasons, the Antimony Removal Program was undertaken to remove the radioactive and elemental antimony from the nuclear steam supply system at all three units. The work presented here describes the antimony decontamination and disposal

  8. Les enjeux écologiques de Palo Verde (Costa Rica

    Directory of Open Access Journals (Sweden)

    Bertrand LÉVY

    1992-09-01

    Full Text Available Près de Palo Verde a été créé un parc naturel. Un projet d’irrigation risque de perturber l’écologie de la région. Une carte de son écosystème a été établie par télédétection, pour évaluer l’impact d’un tel projet.

  9. Escuela Superior de Palos Verdes

    Directory of Open Access Journals (Sweden)

    Neutra, Richard J.

    1965-02-01

    Full Text Available Before initiating the building operations for the «Palos Verdes» School, the site was divided into two large horizontal surfaces, at different levels. The lower one served to accommodate the playing fields, a car park, the physical training building, and shop and ancillary buildings. On the higher of these two surfaces, and to the West of the access road, there is a car park and also the building and plot of ground devoted to agricultural technology, as well as the literary studies and general purpose buildings. As a complement to these, there is a series of blocks, arranged in parallel rows, which house the administrative offices, the art school, the craft's school, the general classrooms, and those devoted to higher education. The fascinating aspect of this school is the outstanding penetration of the architect's mind into the essential function of the project. Its most evident merit is the sense of comradeship and harmony that permeates the whole architectural manifold.Antes de construir el complejo escolar «Palos Verdes» se comenzó por crear, en el terreno, dos grandes mesetas a niveles diferentes. Sobre el inferior se organizaron: los campos de juegos, de deportes, un aparcamiento, el edificio para educación física y los destinados a tiendas y servicios. Sobre la meseta superior, al oeste de la vía de acceso, se dispuso un aparcamiento y el edificio y campo para adiestramiento agrícola; al este, otro aparcamiento, el edificio dedicado a materias literarias, y el destinado a usos múltiples. Completan las instalaciones de la escuela una serie de bloques paralelos: la administración, la escuela de arte, las clases de trabajos manuales, las aulas de enseñanzas generales, y las de los cursos superiores. Lo fascinante de este complejo escolar es la perfecta y magistral compenetración del arquitecto con el tema proyectado, y su mayor mérito, la sensación de cordialidad y armonía con el ambiente.

  10. Macroinvertebrados bentónicos del humedal de Palo Verde, Costa Rica

    Directory of Open Access Journals (Sweden)

    F.A Trama

    2009-11-01

    Full Text Available El humedal de Palo Verde es uno de los más importantes de Centro America para aves acuáticas. Durante el período 2002 y 2005, se llevaron a cabo actividades de manejo para controlar la invasión de Typha domingensis. Con el fin de establecer una línea base para monitoreos futuros, en el 2003 se realizó una evaluación de macroinvertebrados acuáticos. Se efectuó un muestreo mensual durante un año, usando el método de sustratos artificiales. Se identificaron 116 táxones pertenecientes a 47 familias y a 18 órdenes. La mayor abundancia se encontró en la clase Conchostraca y la familia Chironomidae que juntas representaron casi la mitad de todos los individuos colectados. En contraste, el 97% de los táxones tuvieron, cada uno, menos del 1% del total de la abundancia. La diversidad de táxones, así como la abundancia de individuos y el número de especies, fueron mayores en la época seca que en la lluviosa. La curva acumulada de especies indicó que se hubiera registrado una mayor cantidad de táxones si los muestreos se hubieran extendido por más tiempo. Con este trabajo damos a conocer la primera lista de macroinvertebrados para el humedal de Palo Verde.Benthic macroinvertebrates of the Palo Verde wetland, Costa Rica. Palo Verde, Costa Rica, is one of the most important wetlands in the region now recovering from some invasive plants, especially Typha domingensis, and monitoring programs were started, including studies on the aquatic macoinvertebrate fauna. We sampled benthic macroinvertebrates monthly for more than a year with artificial substrates, and identified 116 taxa from 57 families and 18 orders, with 90 morfospecies of insects. The highest abundances were in the class Conchostraca (typical in seasonal wetlands and in the family Chironomidae (Diptera, Insecta, which together represent almost half of all individuals collected. In contrast, 97 taxa were less than 1% of total abundance each. Number of individuals and number of

  11. Update-processing steam generator cleaning solvent at Palo Verde

    International Nuclear Information System (INIS)

    Peters, G.

    1996-01-01

    Framatome Technologies Inc.(FTI) recently completed the steam generator chemical cleanings at the Palo Verde Nuclear Generating Station Units 1, 2 and 3. Over 500,000 gallons of low-level radioactive solvents were generated during these cleanings and were processed on-site. Chemical cleaning solutions containing high concentrations of organic chelating wastes are difficult to reduce in volume using standard technologies. The process that was ultimately used at Palo Verde involved three distinct processing steps: The evaporation step was conducted using FTI's submerged combustion evaporator (SCE) that has also been successfully used at Arkansas Nuclear One - Unit 1, Three Mile Island - Unit 1, and Oconee on similar waste. The polishing step of the distillate used ultrafiltration (UF) and reverse osmosis (RO) technology that was also used extensively by Ontario Hydro to assist in their processing of chemical cleaning solvent. This technology, equipment, and operations personnel were provided by Zenon Environmental, Inc. The concentrate from the evaporator was absorbed with a special open-quotes peat mossclose quotes based media that allowed it to be shipped and buried at the Environcare of Utah facility. This is the first time that this absorption media or burial site has been used for chemical cleaning solvent

  12. Human factors engineering control-room-design review/audit report: Palo Verde Nuclear Generating Station, Arizona Public Service Company

    International Nuclear Information System (INIS)

    Savage, J.W.; Lappa, D.A.

    1981-01-01

    A human factors engineering design review of the Palo Verde control room simulator was performed at the site on September 15 through September 17, 1981. Observed human factors design discrepancies were given priority ratings. This report summarizes the team's observations of the control room design and layout and of the control room operators' interface with the control room environment. A list of the human factors strengths observed in the Palo Verde control room simulator is given

  13. A novel feedwater system for the RETRAN model of the Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Secker, P.A.; Webb, J.R.

    1988-01-01

    This paper presents a feedwater system model which supplies realistic boundary conditions to the RETRAN model of a Palo Verde Nuclear Generating Station reactor plant. The RETRAN thermal hydraulic code is used to analyze nuclear reactor system transients through a generalized thermal hydraulic volume/junction network. The feedwater system model is implemented using the control block modeling option available in the RETRAN code. The output of the control block model is coupled to the thermal hydraulic network by a fill junction. A forward Euler integration scheme is used by RETRAN for control block variables. The feedwater system model is formulated to allow implicit integration within the existing code framework. The potential need for small integration time steps is, therefore, alleviated. The model results are compared with test data

  14. Macroinvertebrados bentónicos del humedal de Palo Verde, Costa Rica

    Directory of Open Access Journals (Sweden)

    F.A Trama

    2009-11-01

    Full Text Available El humedal de Palo Verde es uno de los más importantes de Centro America para aves acuáticas. Durante el período 2002 y 2005, se llevaron a cabo actividades de manejo para controlar la invasión de Typha domingensis. Con el fin de establecer una línea base para monitoreos futuros, en el 2003 se realizó una evaluación de macroinvertebrados acuáticos. Se efectuó un muestreo mensual durante un año, usando el método de sustratos artificiales. Se identificaron 116 táxones pertenecientes a 47 familias y a 18 órdenes. La mayor abundancia se encontró en la clase Conchostraca y la familia Chironomidae que juntas representaron casi la mitad de todos los individuos colectados. En contraste, el 97% de los táxones tuvieron, cada uno, menos del 1% del total de la abundancia. La diversidad de táxones, así como la abundancia de individuos y el número de especies, fueron mayores en la época seca que en la lluviosa. La curva acumulada de especies indicó que se hubiera registrado una mayor cantidad de táxones si los muestreos se hubieran extendido por más tiempo. Con este trabajo damos a conocer la primera lista de macroinvertebrados para el humedal de Palo Verde.

  15. Palos Verdes Shelf oceanographic study; data report for observations December 2007–April 2008

    Science.gov (United States)

    Rosenberger, Kurt J.; Noble, Marlene A.; Sherwood, Christopher R.; Martini, Marinna M.; Ferreira, Joanne T.; Montgomery, Ellyn T.

    2011-01-01

    Beginning in 1997, the Environmental Protection Agency (EPA) defined a contaminated section of the Palos Verdes Shelf region in southern California as a Superfund Site, initiating a continuing investigation of this area. The investigation involved the EPA, the U.S. Geological Survey (USGS), Science Applications International Corporation (SAIC), Los Angeles County Sanitation Districts (LACSD) data, and other allied agencies. In mid-2007, the Palos Verdes Shelf project team identified the need for additional data on the sediment properties and oceanographic conditions at the Palos Verdes Superfund Site and deployed seven bottom platforms, three subsurface moorings, and three surface moorings on the shelf. This additional data was needed to support ongoing modeling and feasibility studies and to improve our ability to model the fate of the effluent-affected deposit over time. It provided more detail on the spatial variability and magnitude of resuspension of the deposit during multiple storms that are expected to transit the region during a winter season. The operation began in early December 2007 and ended in early April 2008. The goal was to measure the sediment response (threshold of resuspension, suspended-sediment concentrations, and suspended-sediment transport rates) to bed stresses associated with waves and currents. Other objectives included determining the structure of the bottom boundary layer (BBL) relating nearbed currents with those measured at 10 m above bottom (mab) and comparing those with the long-term data from the LACSD Acoustic Doppler Current Profiler (ADCP) deployments for nearbed current speed and direction. Low-profile tripods with high-frequency ADCPs co-located with two of the large tripods were selected for this goal. This report describes the data obtained during the field program, the instruments and data-processing procedures used, and the archive that contains the data sets that have passed our quality-assurance procedures.

  16. Core Follow Calculation for Palo Verde Unit 1 in Cycles 1 through 4 using DeCART2D/MASTER4.0 Code System

    International Nuclear Information System (INIS)

    Jeong, Hee Jeong; Choi, Yonghee; Kim, Sungmin; Lee, Kyunghoon

    2017-01-01

    To verify and validate the DeCART2D/MASTER4.0 design system, core follow calculations of Palo Verde Unit 1(PV-1) in cycles 1 through 4 are performed. The calculation results are compared with the measured data and will be used in the generation of bias and uncertainty factors in the DeCART2D/MASTER4.0 design system. The DeCART2D/MASTER codes system has been developed in KAERI for the PWR (Pressurized water reactors) core design including SMRs (Small Modular Reactors). Core follow calculations of Pale Verde Unit 1 in Cycles 1 through 4 have been performed. Reactivities, assembly powers and startup parameters such as EPC, RW, ITC and IBW are compared with the measured data. This work will be used in the generation of bias and uncertainty factors in DeCART2D/MASTER4.0 design system.

  17. Tube structural integrity evaluation of Palo Verde Unit 1 steam generators for axial upper-bundle cracking

    International Nuclear Information System (INIS)

    Woodman, B.W.; Begley, J.A.; Brown, S.D.; Sweeney, K.; Radspinner, M.; Melton, M.

    1995-01-01

    The analysis of the issue of upper bundle axial ODSCC as it apples to steam generator tube structural integrity in Unit 1 at the Palo Verde Nuclear generating Station is presented in this study. Based on past inspection results for Units 2 and 3 at Palo Verde, the detection of secondary side stress corrosion cracks in the upper bundle region of Unit 1 may occur at some future date. The following discussion provides a description and analysis of the probability of axial ODSCC in Unit 1 leading to the exceedance of Regulatory Guide 1.121 structural limits. The probabilities of structural limit exceedance are estimated as function of run time using a conservative approach. The chosen approach models the historical development of cracks, crack growth, detection of cracks and subsequent removal from service and the initiation and growth of new cracks during a given cycle of operation. Past performance of all Palo Verde Units as well as the historical performance of other steam generators was considered in the development of cracking statistics for application to Unit 1. Data in the literature and Unit 2 pulled tube examination results were used to construct probability of detection curves for the detection of axial IGSCC/IGA using an MRPC (multi-frequency rotating panake coil) eddy current probe. Crack growth rates were estimated from Unit 2 eddy current inspection data combined with pulled tube examination results and data in the literature. A Monte-Carlo probabilistic model is developed to provide an overall assessment of the risk of Regulatory Guide exceedance during plant operation

  18. Palo Verde Unit 3 BMI nozzle modification

    International Nuclear Information System (INIS)

    Waskey, D.

    2015-01-01

    The 61 BMI (Bottom Mount Instrumentation) nozzles of the unit 3 of the Palo Verde plant have been examined through ASME Code Case N722. The nozzle 3 was the only one with leakage noted. The ultrasound testing results are characteristic of PWSCC (Primary Water Stress Corrosion Cracking). The initiation likely occurred at a weld defect which was exposed to the primary water environment resulting in PWSCC. All other nozzles (60) showed no unacceptable indications. Concerning nozzle 3 one crack in J-groove weld connected large defect to primary water. An environmental model has been used to simulate and optimize the repair. The AREVA crew was on site 18 days after contract award and the job was completed in 12 days, 30 hours ahead of baseline schedule. This series of slides describes the examination of the BMI nozzles, the repair steps, and alternative design concepts

  19. The Palo Verde story: a foundation for future multi-station nuclear power plants

    International Nuclear Information System (INIS)

    Brunt, Jr.E.E.Van; Ferguson, C.

    1987-01-01

    In 1973, the design and planning for the Palo Verde Nuclear Generating Station Was started featuring three 3800 MWt Combustion Engineering Standard System 80 Nuclear Steam Supply Systems. Arizona Public Service Company (APS) was the Project Manager and Operating Agent and Bechtel Power Corporation the architect/engineer and constructor. The Palo Verde units are located in a desert environment some 50 miles west of Phoenix, Arizona. It is a 'dry site' in that there are no liquid discharges from the site. The cooling tower makeup water sewage is waste effluent from the City of Phoenix treated at an on site reclamation facility. The effluent has had primary and secondary treatment at the Phoenix plant prior to delivery to PVNGS. The units are physically separate from each other but are of identical design. There are no shared safety systems between the units. Unit 1 and Unit 2 are both in commercial operation (January, 1986 and September, 1986 respectively). Unit 3 is scheduled to load fuel late in the first quarter of 1987. This paper presents some of the engineering and management practices used during design, construction, and startup and operational experiences and other unique features of this multi-unit nuclear station. The site arrangement is shown in Figure 1

  20. Response to IPE and IPEEE results at Palo Verde NGS

    International Nuclear Information System (INIS)

    Lindquist, R.C.

    1992-01-01

    Insights gained from the internal events probabilistic risk assessment (PRA) and from the pilot plant demonstration of the fire-induced vulnerability evaluation (FIVE) have been used to initiate corrective actions in the form of administrative controls, compensatory measures, and plant modifications to reduce the risks associated with significant core-damage sequences. Palo Verde was a pilot demonstration plant for the FIVE methodology developed by the Electrical Power Research Institute and sponsored by the Nuclear Utility Management and Resources Council. Several findings emerged from the application of FIVE and have been acted upon to reduce the impact of fire in several compartments of the plant

  1. 75 FR 53985 - Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary...

    Science.gov (United States)

    2010-09-02

    ... NUCLEAR REGULATORY COMMISSION [Docket No. STN 50-530; NRC-2010-0281] Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary Exemption 1.0 Background Arizona Public Service Company (APS, the licensee) is the holder of Facility Operating License No. NPF-74, which...

  2. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 6 to the Safety Evaluation Report for the application filed by Arizona Public Service Company, et al., for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 5 was issued and (2) matters that the staff had under review when Supplement No. 5 was issued

  3. 75 FR 15745 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-30

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption 1.0 Background The Arizona Public Service Company (APS, the licensee) is the holder of Facility... Generating Station (PVNGS), Units 1, 2, and 3, respectively. The licenses provide, among other things, that...

  4. Chemistry technician performance evaluation program Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Shawver, J.M.

    1992-01-01

    The Arizona Nuclear Power Project (ANPP), a three-reactor site located 50 miles west of Phoenix, Arizona, has developed and implemented a program for evaluating individual chemistry technician analytical performance on a routine basis. About 45 chemistry technicians are employed at the site, 15 at each operating unit. The technicians routinely perform trace level analyses for impurities of concern to PWRs. Each month a set of blind samples is provided by an outside vendor. The blind samples contain 16 parameters which are matrixed to approximate the PWR's primary and secondary cycles. Nine technicians receive the samples, three from each operating unit, and perform the required analyses. Acceptance criteria for successful performance on the blind parameters is based on the values found in the Institute of Nuclear Power Operations (INPO) Document 83-016, Revision 2, August 1989, Chemistry Quality Control Program. The goal of the program is to have each technician demonstrate acceptable performance on each of 16 analytical parameters. On completion of each monthly set, a summary report of all of the analytical results for the sample set is prepared. From the summary report, analytical bias can be detected, technician performance is documented, and overall laboratory performance can be evaluated. The program has been very successful at satisfying the INPO requirement that the analytical performance of each individual technician should be checked on at least a six-month frequency for all important parameters measured. This paper describes the program as implemented at the Palo Verde Nuclear Generating Station and provides a summary report and trend and bias graphs for illustrative purposes

  5. DDE in sediments of the Palos Verdes shelf, California: In situ transformation rates and geochemical fate

    Science.gov (United States)

    Eganhouse, R.P.; Pontolillo, J.

    2008-01-01

    From 1947 to 1971 the world's largest manufacturer of DDT discharged process wastes into the sewers of Los Angeles County. Roughly 870-1450 t of DDT were released to the ocean off Palos Verdes, CA, a portion of which (???100 t) resides in sediments on the continental shelf and slope. The most abundant DDT compound in the sediments, p,p???-DDE, is degrading by reductive dechlorination, butthe rate of transformation and factors controlling it are not well understood. In order to estimate in situ transformation rates and predict the long-term fate of p,p???-DDE, box cores were collected in 1992 and 2003 from a single location on the Palos Verdes Shelf and analyzed for 8 DDT compounds and 84 polychlorinated biphenyl (PCB) congeners. The PCBs show no evidence of dechlorination, and inventories did not change between 1992 and 2003. By contrast, the inventory of p,p???-DDE decreased by 43%, whereas that of p,p???-DDMU, the putative reductive dechlorination product increased by 34%. The first-order transformation rate for p,p???-DDE at the study site is 0.051 ?? 0.006 yr-1. A multistep reaction model suggests that inventories of p,p???-DDE and p,p???-DDMU will continue to decline, whereas that of p,p???-DDNU will reach a maximum around 2014.

  6. Use of probabilistic risk assessment in maintenance activities at Palo Verde

    International Nuclear Information System (INIS)

    Lindquist, R.C.; Pobst, D.S.

    1993-01-01

    Probabilistic risk assessment (PRA) is an important tool in addressing various maintenance activities. At the Palo Verde nuclear generating station (PVNGS), the PRA has been used in a variety of ways to support a wide and diverse selection of maintenance-related activities. For on-line or at-power maintenance, the PRA was used to evaluate combinations of maintenance activities possible with the 12-week or floating maintenance schedule. The maintenance schedule was evaluated to identify any higher risk, undesirable combinations of equipment outages, such as the sole steam-driven auxiliary feedwater pump and the same train emergency diesel generator. Table I is a sampling of the results from the maintenance schedule evaluation in terms of increase in conditional core damage frequency (CDF) above the base- line value due to maintenance on some important key safety systems and combinations thereof. The baseline CDF is 7.4 x 10 -7 per 72 h

  7. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 9 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 8 was issued; and (2) matters that the staff had under review when Supplement No. 8 was issued, specifically those issues which required resolution prior to Unit 2 fuel loading and testing up to 5% of full power

  8. Palo Verde Nuclear Generating Station: an example of the state role in regional nuclear projects

    International Nuclear Information System (INIS)

    Pasternak, A.

    1980-10-01

    A nuclear power plant siting policy which confines new construction to existing sites will lead to the formation of large regional power centers, each involving many utilities from several states. The Palo Verde Nuclear Project in Arizona has been examined in terms of the role state regulation plays in large regional nuclear projects. State regulatory processes do not reflect the regional nature of large power centers. Decisions and actions by individual state regulatory commissions create risk and uncertainty for all the utility participants in regional projects. A climate and mechanism to encourage and facilitate interstate cooperation are needed to enhance the viability of the confined siting policy and the regional power center concept

  9. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Dockets Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 11 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizone, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued and (2) other matters requiring staff review since Supplenent No. 10 was issued, specifically those issues that required resolution before Unit 3 low-power licensing

  10. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 7

    International Nuclear Information System (INIS)

    1984-12-01

    Supplement No. 7 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 6 was issued; and (2) matters that the staff had under review when Supplement No. 6 was issued

  11. Currents, temperature, conductivity, attenuation, and sigma-theta data from moorings deployed off the coast of Palos Verdes, CA from platforms VICKERS and ROBERT GORDON SPROUL from May 21, 1992 and March 30, 1993 (NODC Accession 0067573)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The sediments on the shelf off Palos Verdes CA are contaminated with large amounts of DDT. Moorings were deployed on the shelf in the winter of 1993 in part to...

  12. Currents, wind speed, wind direction, temperature, attenuation, conductivity, and sigma-theta data from moorings deployed off the coast of Palos Verdes, CA from platforms ROBERT GORDON SPROUL, SEAWATCH, and YELLOWFIN from February 15, 2004 to July 8, 2004 (NODC Accession 0067574)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Palos Verdes shelf near Los Angeles is contaminated with DDT and PCBs discharged through the White Point ocean outfalls, mostly prior to 1971. The U. S....

  13. Currents, temperature, conductivity, attenuation, sigma-theta, and wave statistics data from moorings deployed off the coast of Palos Verdes, CA from platforms ROBERT GORDON SPROUL, YELLOWFIN, and SEA WATCH from December 3, 2007 to April 29, 2008 (NODC Accession 0067575)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Palos Verdes shelf near Los Angeles is contaminated with DDT and PCBs discharged through the White Point ocean outfalls, mostly prior to 1971. The U. S....

  14. Sediment transport on the Palos Verdes shelf, California

    Science.gov (United States)

    Ferre, B.; Sherwood, C.R.; Wiberg, P.L.

    2010-01-01

    Sediment transport and the potential for erosion or deposition have been investigated on the Palos Verdes (PV) and San Pedro shelves in southern California to help assess the fate of an effluent-affected deposit contaminated with DDT and PCBs. Bottom boundary layer measurements at two 60-m sites in spring 2004 were used to set model parameters and evaluate a one-dimensional (vertical) model of local, steady-state resuspension, and suspended-sediment transport. The model demonstrated skill (Brier scores up to 0.75) reproducing the magnitudes of bottom shear stress, current speeds, and suspended-sediment concentrations measured during an April transport event, but the model tended to underpredict observed rotation in the bottom-boundary layer, possibly because the model did not account for the effects of temperature-salinity stratification. The model was run with wave input estimated from a nearby buoy and current input from four to six years of measurements at thirteen sites on the 35- and 65-m isobaths on the PV and San Pedro shelves. Sediment characteristics and erodibility were based on gentle wet-sieve analysis and erosion-chamber measurements. Modeled flow and sediment transport were mostly alongshelf toward the northwest on the PV shelf with a significant offshore component. The 95th percentile of bottom shear stresses ranged from 0.09 to 0.16 Pa at the 65-m sites, and the lowest values were in the middle of the PV shelf, near the Whites Point sewage outfalls where the effluent-affected layer is thickest. Long-term mean transport rates varied from 0.9 to 4.8 metric tons m-1 yr-1 along the 65-m isobaths on the PV shelf, and were much higher at the 35-m sites. Gradients in modeled alongshore transport rates suggest that, in the absence of a supply of sediment from the outfalls or PV coast, erosion at rates of ???0.2 mm yr-1 might occur in the region southeast of the outfalls. These rates are small compared to some estimates of background natural sedimentation

  15. An evaluation on the design optimization of large capacity tanks in the chemical and volume control system for YGN 3 and 4

    International Nuclear Information System (INIS)

    Park, Byung Ho; Kim, Eun Ki; Ko, Deuk Yoon; Ko, Yong Sang; Kim, Seok Bum

    1996-06-01

    The design of Yonggwang nuclear power plant units 3 and 4 (YGN 3 and 4) is referenced to that of Palo Verde nuclear power plant (Palo Verde NPP) in Arizona, USA. The reactor vessel and steam generator of YGN 3 and 4 are smaller than that of Palo Verde NPP because Palo Verde NPP produces 1,300 Mw electricity, on the other hand, YGN 3 and 4 produces 1,000 Mw electricity. However, other components and systems of YGN 3 and 4 are the same as those of Palo verde NPP. The oversized system components may be considered to ensure the safety and operability by providing sufficient design margin, but it requires unnecessary cost burden to the owner of the plant. This report focuses on the optimization of the volume of the large tanks (i.e., above 400,000 gallons) in CVCS. These tanks are refueling water tank (RWT), reactor makeup water tank (RMWT) and holdup tank (HT). It has been performed that the calculation on the required tank volume based on design requirements, comparison on the calculation results with as-built design, and estimation on the instrumentation setpoint. 19 tabs., 12 figs., 13 refs. (Author)

  16. Aerial radiological survey of the Palo Verde Nuclear Generating Station and surrounding area, Wintersburg, Arizona. Date of survey: November 1982

    International Nuclear Information System (INIS)

    Semmler, R.A.

    1984-01-01

    An aerial survey of terrestrial gamma radiation was performed during the period 4 November through 15 November 1982 over a 16-kilometer by 16-kilometer (10-mile by 10-mile) area approximately centered on the Palo Verde Nuclear Generating Station near Wintersburg, Arizona. Gamma radiation spectral data were collected while flying a helicopter over a regular pattern of parallel lines spaced 150 meters (500 feet) apart at an altitude of 90 meters (300 feet). All radiation measurements taken at the nominal flight altitude were corrected for altitude variations, cosmic radiation, and helicopter background to generate exposure rates from terrestrial sources extrapolated to 1 meter above ground level. The data are presented as isoradiation contour maps. The average terrestrial radiation levels fall between 8 and 14 microrentgens per hour (μR/h). All gamma radiation detected within the survey area was associated with naturally occurring radionuclides. Direct ground-based measurements at 1 meter height were also taken at four scattered sites within the survey area. These values agree with the contour intervals determined from the aerial measurements and differ from the mean value of adjacent contours by no more than 10%. 6 references, 5 figures, 2 tables

  17. Depositional history of organic contaminants on the Palos Verdes Shelf, California

    Science.gov (United States)

    Eganhouse, R.P.; Pontolillo, J.

    2000-01-01

    During more than 60 years, sedimentation on the Palos Verdes Shelf has been dominated by time-varying inputs of municipal wastewater from the Los Angeles County Sanitation Districts (LACSD) and debris from the Portuguese Bend Landslide (PBL). The present study examines the depositional history of wastewater-derived organic contaminants at a site approximately 6-8 km downcurrent from the outfall system. Sediments at this location are impacted by contributions from both sources, but the relative influence of the sources has changed over time. Two classes of hydrophobic organic contaminants (chlorinated hydrocarbons, long-chain alkylbenzenes) were determined in sediment cores collected in 1981 and 1992. Using molecular stratigraphy, we determined average sedimentation rates (cm/year) and mass accumulation rates (g cm-2 year-1) for the following periods: 1955-1965, 1965-1971, 1971-1981 and 1981-1992. The results show that sedimentation and mass accumulation rates increased from 1955 to 1971 and decreased from 1971 to 1981. These trends are consistent with historical information on the emission of suspended solids from the outfall system, indicating that the discharge of wastes dominated sedimentation at the site during this period. In the 1980s and early 1990s, however, mass accumulation rates increased in spite of continually decreasing emissions of wastewater solids. Several lines of evidence indicate that this increase was due to mobilization of debris from the PBL during and after unusually strong winter storms in the 1980s. As a result, heavily contaminated sediments deposited during the years of greatest waste emissions (i.e. 1950-1970) have been buried to greater sub-bottom depths, thereby reducing their availability for mobilization to the overlying water column. These results highlight the dynamic nature of sedimentation in contaminated coastal ecosystems and its importance to the long-term fate and effects of toxic substances.

  18. CARACTERIZACIÓN ESTRUCTURAL DEL MANGLAR EN EL ESTERO PALO VERDE, LAGUNA DE CUYUTLÁN, COLIMA

    Directory of Open Access Journals (Sweden)

    Citlalli P. Téllez-García

    2012-01-01

    Full Text Available En el Estero Palo Verde, ubicado en el vaso IV de la Laguna de Cuyutlán, estado de Colima, se establecieron 48 unidades de muestreo (UM en tres rodales de mangle: 10 UM en rodal monoespecífico de Laguncularia racemosa, 25 UM en rodal monoespecífico de Rhizophora mangle y 13 UM en rodal mixto de L. racemosa-R. mangle. Se registró altura del dosel, diámetro del tronco, densidad de adultos y de repoblación, también se calculó área basal y volumen de madera. Los resultados indicaron que la densidad, área basal y volumen, para la categoría diamétrica (CD de 5 cm fueron significativamente diferentes (P < 0.05 entre los rodales monoespecíficos de R. mangle (2,500 árboles•ha-1, 4.2 m2•ha-1 y 22 m3•ha-1, respectivamente y L. racemosa (700 árboles•ha-1, 1.9 m2•ha-1 y 10 m3•ha-1, respectivamente. En las CD de 20 a 30 cm, el área basal fue significativamente mayor (P < 0.05 en el rodal monoespecífico de L. racemosa (1.6 - 3.8 m2•ha-1 que en el mixto de L. racemosa-R. mangle (0.5 - 2.5 m2•ha-1. La repoblación natural fue más abundante en el rodal de R. mangle (138 a 270 individuos•ha-1 que en el de L. racemosa (70 a 80 individuos•ha-1. Los valores estructurales mayores se alcanzaron para altura del dosel (10 m en el rodal de L. racemosa; para diámetro (40 cm y área basal (14.1 m2•ha-1 en el rodal de L. racemosa-R. mangle; y para repoblación natural (624 individuos•ha-1 en el rodal de R. mangle.

  19. Spatial distribution of Guaiacum sanctum (Zygophyllaceae seedlings and saplings relative to canopy cover in Palo Verde National Park, Costa Rica

    Directory of Open Access Journals (Sweden)

    Eric J. Fuchs

    2013-09-01

    Full Text Available The spatial distribution of individuals is a fundamental property of most species and constitutes essential information for the development of restoration and conservation strategies, especially for endangered plant species. In this paper we describe the spatial distribution of different size classes of the endangered tropical tree Guaiacum sanctum and the effect of canopy cover on spatial aggregation. Adult G. sanctum were located and mapped in a 50ha plot in Palo Verde National Park, Costa Rica. Seedlings, saplings and juveniles were mapped to the nearest centimetre and permanently marked in three 50x50m subplots. Within each subplot spatial aggregation was assessed using Ripley’s K statistic and canopy opening readings were performed every 5m using a densitometer. Kriging spatial interpolation and Monte Carlo simulations were used to determine if average canopy cover differed among size classes. Individuals of G. sanctum were spatially aggregated at all size classes with seedlings being the most frequent size class in all subplots. Seedlings were found predominantly in areas with significantly higher canopy cover. In contrast, juveniles were more likely found in areas with higher light availability. The high number of seedlings, saplings, and juveniles relative to adults suggests that populations of G. sanctum in PVNP are expanding. Light availability and canopy structure are important factors shaping the spatial distribution of this species. The contemporary demographic structure of G. sanctum is dependent on forest gap dynamics and changes in human disturbance during the past 25 years.

  20. Estimation of fast neutron fluence in steel specimens type Laguna Verde in TRIGA Mark III reactor; Estimacion de la fluencia de neutrones rapidos en probetas de acero tipo Laguna Verde en el reactor Triga Mark III

    Energy Technology Data Exchange (ETDEWEB)

    Galicia A, J.; Francois L, J. L. [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Ciudad Universitaria, 04510 Ciudad de Mexico (Mexico); Aguilar H, F., E-mail: blink19871@hotmail.com [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2015-09-15

    The main purpose of this work is to obtain the fluence of fast neutrons recorded within four specimens of carbon steel, similar to the material having the vessels of the BWR reactors of the nuclear power plant of Laguna Verde when subjected to neutron flux in a experimental facility of the TRIGA Mark III reactor, calculating an irradiation time to age the material so accelerated. For the calculation of the neutron flux in the specimens was used the Monte Carlo code MCNP5. In an initial stage, three sheets of natural molybdenum and molybdenum trioxide (MoO{sub 3}) were incorporated into a model developed of the TRIGA reactor operating at 1 M Wth, to calculate the resulting activity by setting a certain time of irradiation. The results obtained were compared with experimentally measured activities in these same materials to validate the calculated neutron flux in the model used. Subsequently, the fast neutron flux received by the steel specimens to incorporate them in the experimental facility E-16 of the reactor core model operating at nominal maximum power in steady-state was calculated, already from these calculations the irradiation time required was obtained for values of the neutron flux in the range of 10{sup 18} n/cm{sup 2}, which is estimated for the case of Laguna Verde after 32 years of effective operation at maximum power. (Author)

  1. Estimation of fast neutron fluence in steel specimens type Laguna Verde in TRIGA Mark III reactor

    International Nuclear Information System (INIS)

    Galicia A, J.; Francois L, J. L.; Aguilar H, F.

    2015-09-01

    The main purpose of this work is to obtain the fluence of fast neutrons recorded within four specimens of carbon steel, similar to the material having the vessels of the BWR reactors of the nuclear power plant of Laguna Verde when subjected to neutron flux in a experimental facility of the TRIGA Mark III reactor, calculating an irradiation time to age the material so accelerated. For the calculation of the neutron flux in the specimens was used the Monte Carlo code MCNP5. In an initial stage, three sheets of natural molybdenum and molybdenum trioxide (MoO 3 ) were incorporated into a model developed of the TRIGA reactor operating at 1 M Wth, to calculate the resulting activity by setting a certain time of irradiation. The results obtained were compared with experimentally measured activities in these same materials to validate the calculated neutron flux in the model used. Subsequently, the fast neutron flux received by the steel specimens to incorporate them in the experimental facility E-16 of the reactor core model operating at nominal maximum power in steady-state was calculated, already from these calculations the irradiation time required was obtained for values of the neutron flux in the range of 10 18 n/cm 2 , which is estimated for the case of Laguna Verde after 32 years of effective operation at maximum power. (Author)

  2. Advanced light water reactor program at ABB-Combustion Engineering Nuclear Power

    International Nuclear Information System (INIS)

    Cahn, H.

    1990-01-01

    To meet the needs of Electric Utilities ordering nuclear power plants in the 1990s, ABB-Combustion Engineering is developing two designs which will meet EPRI consensus requirements and new licensing issues. The System 80 Plus design is an evolutionary pressurized water reactor plant modelled after the successful System 80 design in operation in Palo Verde and under construction in Korea. System Plus is currently under review by the US Nuclear Regulatory Commission with final design approval expected in 1991 and design certification in 1992. The Safe Integral Reactor (SIR) plant is a smaller facility with passive safety features and modular construction intended for design certification in the late 1990s. (author)

  3. Records of continental slope sediment flow morphodynamic responses to gradient and active faulting from integrated AUV and ROV data, offshore Palos Verdes, southern California Borderland

    Science.gov (United States)

    Maier, Katherine L.; Brothers, Daniel; Paull, Charles K.; McGann, Mary; Caress, David W.; Conrad, James E.

    2016-01-01

    Variations in seabed gradient are widely acknowledged to influence deep-water deposition, but are often difficult to measure in sufficient detail from both modern and ancient examples. On the continental slope offshore Los Angeles, California, autonomous underwater vehicle, remotely operated vehicle, and shipboard methods were used to collect a dense grid of high-resolution multibeam bathymetry, chirp sub-bottom profiles, and targeted sediment core samples that demonstrate the influence of seafloor gradient on sediment accumulation, depositional environment, grain size of deposits, and seafloor morphology. In this setting, restraining and releasing bends along the active right-lateral Palos Verdes Fault create and maintain variations in seafloor gradient. Holocene down-slope flows appear to have been generated by slope failure, primarily on the uppermost slope (~ 100–200 m water depth). Turbidity currents created a low relief (water depositional systems. These results help to bridge gaps in scale between existing deep-sea and experimental datasets and may provide constraints for future numerical modeling studies.

  4. Out of operation in simultaneous way of the two reactors of nucleoelectric central of Laguna Verde(Mexico)

    International Nuclear Information System (INIS)

    Mar, Bernardo Salas

    2013-01-01

    The two nuclear reactors that Mexico has in the Laguna Verde Nuclear Power Plant, were out of operation simultaneously in September 2012. First it was reported that one of the reactors had problems with the diesel generator, while the other had problems with the nuclear fuel reloading. The day after it was reported a problem related to sediment in the Obra de Toma, place the plant feeds seawater to cool the condenser the depth to which it must operate is 6 meters, with the current level of 1.5 meters, causing a lack of cooling water. Finally it was reported the cause of the suspension of operations, the cracks in jet pumps in both reactors. It is described a brief analysis of these opinions. The reactors are of cooling water of General Electric (BWR-5) and generate 1640 MWe each one

  5. Palo Verde Nuclear Generating Station Units 1, 2, and 3: Draft environmental statement (Docket Nos. STN 50-528, 529, and 530)

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Corporation for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2 and 3. Preparation of the 3880-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use (Sec. 4. 1). Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects (Sec. 4.3 and 4.5). Approximately 60 acres of agricultural land will be temporarily affected by construction in transmission corridors. The great majority can be returned to that use upon completion of construction, thus the impact is considered minor. Similarly, most grazing lands affected along these corridors, as well as along the water pipeline corridor, can eventually be returned to that use. New archaeological resources could be discovered along the path of final transmission corridor alignments. The applicant will take measures to locate and protect such resources if they exist. 75 refs., 24 figs., 65 tabs

  6. Analysis of the documents about the core envelopment of nuclear reactor at the Laguna Verde U-1 power plant

    International Nuclear Information System (INIS)

    Zamora R, L.; Medina F, A.

    1999-01-01

    The degradation of internal components at BWR type reactors is an important subject to consider in the performance availability of the power plant. The Wuergassen nuclear reactor license was confiscated due to the presence of cracking in the core envelopment. In consequence it is necessary carrying out a detailed study with the purpose to avoid these problems in the future. This report presents a review and analysis of documents and technical information referring to the core envelopment of a BWR/5/6 and the Laguna Verde Unit 1 nuclear reactor in Mexico. In this document are presented design data, documents about fabrication processes, and manufacturing of core envelopment. (Author)

  7. Safety evaluation report related to the operation of Palo Verde nuclear generating station, Units 1, 2, and 3. Docket Nos. STN 50-528, STN 50-529, and STN 50-530, Arizona Public Service Company

    International Nuclear Information System (INIS)

    1982-05-01

    On November 13, 1981, the Nuclear Regulatory Commission (NRC) staff issued its Safety Evaluation Report (SER) relating to the application for licenses to operate the Palo Verde Nuclear Generating Station, Unit Nos. 1, 2 and 3 (PVNGS 1-3); Supplement No. 1 to the SER was issued on February 4, 1982. In the SER and Supplement No. 1, the staff identified certain issues where either further information was required of the applicant or additional staff effort was necessary to complete the review of the application. The purpose of this supplement is to update the SER by providing (1) the evaluation of additional information submitted by the applicant since Supplement No. 1 to the SER was issued, and (2) the evaluation of the matters that the staff had under review and Supplement No. 1 was issued

  8. Final supplement to the final environmental statement related to construction of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1976-02-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do results from the proposed action. 26 refs., 1 fig., 20 tabs

  9. Thermal limits validation of gamma thermometer power adaption in CFE Laguna Verde 2 reactor core

    Energy Technology Data Exchange (ETDEWEB)

    Cuevas V, G.; Banfield, J. [GE-Hitachi Nuclear Energy Americas LLC, Global Nuclear Fuel, Americas LLC, 3901 Castle Hayne Road, Wilmingtonm, North Carolina (United States); Avila N, A., E-mail: Gabriel.Cuevas-Vivas@ge.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2016-09-15

    This paper presents the status of GEH work on Gamma Thermometer (GT) validation using the signals of the instruments installed in the Laguna Verde Unit 2 reactor core. The long-standing technical collaboration between Comision Federal de Electricidad (CFE), Global Nuclear Fuel - Americas LLC (GNF) and GE-Hitachi Nuclear Energy Americas LLC (GEH) is moving forward with solid steps to a final implementation of GTs in a nuclear reactor core. Each GT is integrated into a slightly modified Local Power Range Monitor (LPRM) assembly. Six instrumentation strings are equipped with two gamma field detectors for a total of twenty-four bundles whose calculated powers are adapted to the instrumentation readings in addition to their use as calibration instruments for LPRMs. Since November 2007, the six GT instrumentation strings have been operable with almost no degradation by the strong neutron and gamma fluxes in the Laguna Verde Unit 2 reactor core. In this paper, the thermal limits, Critical Power Ratio (CPR) and maximum Linear Heat Generation Rate (LHGR), of bundles directly monitored by either Traverse In-core Probes (TIPs) or GTs are used to establish validation results that confirm the viability of TIP system replacement with automatic fixed in-core probes (AFIPs, GTs, in a Boiling Water Reactor. The new GNF steady-state reactor core simulator AETNA02 is used to obtain power and exposure distribution. Using this code with an updated methodology for GT power adaption, a reduced value of the GT interpolation uncertainty is obtained that is fed into the LHGR calculation. This new method achieves margin recovery for the adapted thermal limits for use in the Economic Simplified Boiling Water Reactor (ESBWR) or any other BWR in the future that employs a GT based AFIP system for local power measurements. (Author)

  10. Thermal limits validation of gamma thermometer power adaption in CFE Laguna Verde 2 reactor core

    International Nuclear Information System (INIS)

    Cuevas V, G.; Banfield, J.; Avila N, A.

    2016-09-01

    This paper presents the status of GEH work on Gamma Thermometer (GT) validation using the signals of the instruments installed in the Laguna Verde Unit 2 reactor core. The long-standing technical collaboration between Comision Federal de Electricidad (CFE), Global Nuclear Fuel - Americas LLC (GNF) and GE-Hitachi Nuclear Energy Americas LLC (GEH) is moving forward with solid steps to a final implementation of GTs in a nuclear reactor core. Each GT is integrated into a slightly modified Local Power Range Monitor (LPRM) assembly. Six instrumentation strings are equipped with two gamma field detectors for a total of twenty-four bundles whose calculated powers are adapted to the instrumentation readings in addition to their use as calibration instruments for LPRMs. Since November 2007, the six GT instrumentation strings have been operable with almost no degradation by the strong neutron and gamma fluxes in the Laguna Verde Unit 2 reactor core. In this paper, the thermal limits, Critical Power Ratio (CPR) and maximum Linear Heat Generation Rate (LHGR), of bundles directly monitored by either Traverse In-core Probes (TIPs) or GTs are used to establish validation results that confirm the viability of TIP system replacement with automatic fixed in-core probes (AFIPs, GTs, in a Boiling Water Reactor. The new GNF steady-state reactor core simulator AETNA02 is used to obtain power and exposure distribution. Using this code with an updated methodology for GT power adaption, a reduced value of the GT interpolation uncertainty is obtained that is fed into the LHGR calculation. This new method achieves margin recovery for the adapted thermal limits for use in the Economic Simplified Boiling Water Reactor (ESBWR) or any other BWR in the future that employs a GT based AFIP system for local power measurements. (Author)

  11. 76 FR 5218 - Advisory Committee on Reactor Safeguards

    Science.gov (United States)

    2011-01-28

    ..., October 21, 2010 (74 FR 65038-65039). Thursday, February 10, 2011, Conference Room T2-B1, 11545 Rockville... Evaluation Report Associated with the License Renewal Application for the Palo Verde Nuclear Generating... NRC staff and Arizona Public Service Company regarding the final Safety Evaluation Report associated...

  12. State-of-the-art dry active waste processing facility

    International Nuclear Information System (INIS)

    Hillmer, T.; Ingalsbe, H.; Alcorn, G.; Anderson, K.; Dahlen, D.

    1989-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is operated by Arizona Public Service for a consortium of seven owners. The site consists of three identical single unit power plants. Each unit is a Combustion Engineering Series 80 pressurized water reactor (PWR) rated at 1270 Megawatts electric. The site is located 100 kilometers west of Phoenix, Arizona in the arid southwest desert region of the United States of America. Since the start up of Unit One in 1985, Palo Verde has aggressively pursued waste volume reduction. This includes a dry active waste (DAW) segregation program that locates and separates nonradioactive and reusable materials that have been mixed with the radioactive DAW. The DAW program is described in further detail in the paper

  13. Assessment of 1-chloro-4-[2,2-dichloro-1-(4-chlorophenyl)ethenyl]benzene (DDE) Transformation Rates on the Palos Verdes Shelf, CA

    Science.gov (United States)

    Eganhouse, Robert P.; Pontolillo, James

    2008-01-01

    In 1953, the world's largest producer of DDT, Montrose Chemical Corporation, began to discharge process wastes into sewers of the Los Angeles County Sanitation Districts (LACSD), California. By 1971, when the sewer connection was terminated, approximately 1,500-2,000 metric tons of DDT had been introduced to the LACSD treatment plant in Carson, CA. After treatment, effluent from this plant was released to the ocean through a submarine outfall system on the Palos Verdes Shelf (PVS) near Los Angeles, resulting in the accumulation of highly contaminated marine sediments. Numerous investigations of the PVS have been undertaken since the late 1960s, but few have focused on the biogeochemical fate of DDT and its transformation products. In the early 1990s, it was shown that DDE, the major DDT compound in the sediments, was being reductively dechlorinated by microorganisms resident in sediments on the PVS. The U.S. Geological Survey undertook a study in cooperation with the U.S. Environmental Protection Agency to provide a better understanding of the range of reductive dechlorination rates on the PVS and the environmental factors that control them. Existing data show that rates of reductive dechlorination are variable spatially. A comparison of data from two cores collected approximately 7 kilometers downcurrent from the outfall systems in 1992 and 2003 yielded an average first-order transformation rate of approximately 0.05 yr-1. A multistep reaction model suggests that inventories of DDE in PVS sediments at the study site will continue to decline, whereas the inventory of the metabolite DDNU will reach a maximum around 2014.

  14. Ageing Management Review of the reactor pressure vessels in Laguna Verde NPP

    International Nuclear Information System (INIS)

    Gris Cruz, Magdalena; Arganis, Carlos R.J.; Medina Almazan, A. Liliana

    2012-01-01

    In the present paper, for both units of Laguna Verde Nuclear Power Plant (LVNPP), the Ageing Management Review of the reactor pressure Vessel was carried out, including the identification of the intended functions, the materials and the environments. The evaluation of the ageing effect/mechanism and the Aging management programs currently implemented were prepared. The most important aging effects/ mechanisms are: loss of fracture toughness due to neutron irradiation embrittlement, fatigue, stress corrosion cracking (SCC), general corrosion and erosion-corrosion. The neutron irradiation embrittlement is managed by the reactor vessel materials surveillance program. The fatigue is a Time Limited Aging Analysis (TLAA), for which is necessary to calculate some fatigue usage factors. SCC is managed by, the In service inspections (ISI) program, but also by the Water Chemistry program, including, currently, On Line Noble Chem. The water chemistry program also manages General Corrosion and erosion-corrosion. The results were compared with the GALL report. (author)

  15. Start-up and operation of Laguna Verde-2

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1996-01-01

    The 665 MWe Laguna Verde-2 nuclear generating unit was accepted into commercial operation on April 10, 1995. The boiling water reactor plant by General Electric (GE) was first synchronized with the grid on November 11, 1994. Laguna Verde-2 is identical with Laguna Verde-1 on the same site. That unit had gone critical for the first time in November 1988 and had first been synchronized with the power grid on April 13, 1989. Commercial operation of Laguna Verde-1 had been started on July 29, 1990. Mexico's only nuclear power plant had been built 70 km north of Veracruz on the east coast and had been scheduled to start operation in 1976. As the Mexican nuclear power program was reduced, the scheduled commissioning dates suffered more and more delays. In the full of 1987, the investigation by the Operational Safety Review Team (Osart) of the International Atomic Energy Agency (IAEA) had indicated that the safety requirements of installations and equpiment were met, and that the whole plant was well prepared for fueling. In mid-1988, the Mexican Government had issued the permit to fuel the Laguna Verde-1 reactor. The contract to build the two units had been awarded in 1972/73. No other nuclear power plants are currently under construction or in the planning phase in Mexico. (orig.) [de

  16. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde; Cuestionamientos al aumento de potencia de los reactores de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Salas M, B., E-mail: salasmarb@yahoo.com.mx [UNAM, Facultad de Ciencias, Departamento de Fisica, Circuito exterior s/n, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2014-08-15

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  17. The Palos Verdes Fault offshore southern California: late Pleistocene to present tectonic geomorphology, seascape evolution and slip rate estimate based on AUV and ROV surveys

    Science.gov (United States)

    Brothers, Daniel S.; Conrad, James E.; Maier, Katherine L.; Paull, Charles K.; McGann, Mary L.; Caress, David W.

    2015-01-01

    The Palos Verdes Fault (PVF) is one of few active faults in Southern California that crosses the shoreline and can be studied using both terrestrial and subaqueous methodologies. To characterize the near-seafloor fault morphology, tectonic influences on continental slope sedimentary processes and late Pleistocene to present slip rate, a grid of high-resolution multibeam bathymetric data, and chirp subbottom profiles were acquired with an autonomous underwater vehicle (AUV) along the main trace of PVF in water depths between 250 and 600 m. Radiocarbon dates were obtained from vibracores collected using a remotely operated vehicle (ROV) and ship-based gravity cores. The PVF is expressed as a well-defined seafloor lineation marked by subtle along-strike bends. Right-stepping transtensional bends exert first-order control on sediment flow dynamics and the spatial distribution of Holocene depocenters; deformed strata within a small pull-apart basin record punctuated growth faulting associated with at least three Holocene surface ruptures. An upper (shallower) landslide scarp, a buried sedimentary mound, and a deeper scarp have been right-laterally offset across the PVF by 55 ± 5, 52 ± 4 , and 39 ± 8 m, respectively. The ages of the upper scarp and buried mound are approximately 31 ka; the age of the deeper scarp is bracketed to 17–24 ka. These three piercing points bracket the late Pleistocene to present slip rate to 1.3–2.8 mm/yr and provide a best estimate of 1.6–1.9 mm/yr. The deformation observed along the PVF is characteristic of strike-slip faulting and accounts for 20–30% of the total right-lateral slip budget accommodated offshore Southern California.

  18. Analysis of the documents about the core envelopment of nuclear reactor at the Laguna Verde U-1 power plant; Analisis de documentos de los materiales de la envolvente del nucleo del reactor nuclear de la CLV U-1

    Energy Technology Data Exchange (ETDEWEB)

    Zamora R, L.; Medina F, A. [Instituto Nacional de Investigaciones Nucleares, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    1999-07-01

    The degradation of internal components at BWR type reactors is an important subject to consider in the performance availability of the power plant. The Wuergassen nuclear reactor license was confiscated due to the presence of cracking in the core envelopment. In consequence it is necessary carrying out a detailed study with the purpose to avoid these problems in the future. This report presents a review and analysis of documents and technical information referring to the core envelopment of a BWR/5/6 and the Laguna Verde Unit 1 nuclear reactor in Mexico. In this document are presented design data, documents about fabrication processes, and manufacturing of core envelopment. (Author)

  19. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    The proposed action is the issuance of construction permits to the Arizona public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be prominently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. The total radiation dose to construction workers is estimated to be 15 man-rem. This dose is a small fraction of the approximately 470 man-rem which will be received by the construction force over the same period from natural background radiation. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result form the proposed action

  20. Design optimization of the Laguna Verde nuclear power station fuel recharge; Optimacion del diseno de recargas de combustible para la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cortes Campos, Carlos Cristobal [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico)

    1991-12-31

    It is described, in general terms, the procedure that is followed to accomplish the optimization of the recharge design, and an example is shown where this procedure was applied for the analysis of the type BWR reactor of Unit No. 1 of the Laguna Verde Nuclear Power Station. [Espanol] Se describe en terminos generales el procedimiento que se sigue para realizar la optimacion del diseno de recargas, y se muestra un ejemplo en el que se utilizo dicho procedimiento para el analisis del reactor tipo BWR de la unidad 1, de la Central Laguna Verde (CLV).

  1. Design optimization of the Laguna Verde nuclear power station fuel recharge; Optimacion del diseno de recargas de combustible para la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cortes Campos, Carlos Cristobal [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico)

    1992-12-31

    It is described, in general terms, the procedure that is followed to accomplish the optimization of the recharge design, and an example is shown where this procedure was applied for the analysis of the type BWR reactor of Unit No. 1 of the Laguna Verde Nuclear Power Station. [Espanol] Se describe en terminos generales el procedimiento que se sigue para realizar la optimacion del diseno de recargas, y se muestra un ejemplo en el que se utilizo dicho procedimiento para el analisis del reactor tipo BWR de la unidad 1, de la Central Laguna Verde (CLV).

  2. To report the obtained results in the simulation with the FCS-11 and Presto codes of the two first operation cycles of the Laguna Verde Unit 1 reactor; Reportar los resultados obtenidos en la simulacion con los codigos FCS-11 y PRESTO de los dos primeros ciclos de operacion del reactor Laguna Verde Unidad 1

    Energy Technology Data Exchange (ETDEWEB)

    Montes T, J.L.; Moran L, J.M.; Cortes C, C.C

    1990-08-15

    The objective of this work is to establish a preliminary methodology to carry out analysis of recharges for the reactor of the Laguna Verde U-1, by means of the evaluation of the state of the reactor core in its first two operation cycles using the FCS2 and Presto-B codes. (Author)

  3. Seismic reflection surveys in central Palo Duro basin

    International Nuclear Information System (INIS)

    Acharya, H.; Buller, M.L.; Lewkowicz, J.; Murphy, P.

    1983-01-01

    Seismic reflection surveys have been conducted in the central Palo Duro basin to provide a basis for identifying localities suitable for the emplacement of an underground high level nuclear waste repository. The objectives of this effort were to determine the structure and stratigraphy in the central Palo Duro basin and evaluate the potential for hydrocarbon resources. Of primary interest is the Upper Permian salt section to a depth of about 3000 ft (914 m). Various tests were carried out along a 3 mi (5 km) segment to determine the most appropriate combination of vibrating source and recording parameters. Approximately 130 mi (209 km) of 24-fold CDP stacked data were acquired. The survey lines were tied to test wells in which velocity surveys were conducted. These data were supplemented by about 400 mi (644 km) of available proprietary CDP stacked data. Analysis of these data strongly suggests that central Palo Duro basin has been tectonically stable since Early Permian time. The maximum offset of the basement is about 600 ft (183 m). These basement faults do not appear to affect any strata above. The San Andres Formation and underlying formations can be traced continuously throughout the area surveyed. Available velocity data from various wells in the central Palo Duro basin show few anomalies, confirming the continuity of the reflecting horizons and the tectonic stability of the area. Hydrocarbon potential of the area is presently being evaluated. The preliminary results of this study are in agreement with the stratigraphic correlations among well logs in the Palo Duro basin

  4. Índices de oxidación en aceites de algunas leguminosas del desierto sonorense

    Directory of Open Access Journals (Sweden)

    Vázquez-Moreno, L.

    2001-02-01

    Full Text Available The oxidation process of crude and refined oils from wild leguminous seeds: Prosopis juliflora (mezquite, Mimosa grahamii (gatuña, Acacia constricta, (vinorama Olneya tesota, (palo fierro Cercidium praecox (palo de brea and Parkinsonia aculeata (palo verde were evaluated during storage for 122 days, using corn and soybean oils as controls. Peroxide, Iodine, Acid and p-Anisidine values were determinated during 122 days of storage at room temperature. The wild leguminous raw oils showed results similar to those for the corn raw oil and lower than those of soybean raw oil. This behavior was similar for refinated oils. The rancid odor was detected after 5 days of storage in soybean oil and 40 days in vinorama oil, on the contrary, mezquite, palo verde and palo of brea oils presented this odor after 62 days, and for gatuña’s oil needed 135 days. Our results indicate that legume seed of Sonoran Desert could be a good alternative as source of oil.El proceso de oxidación fue evaluado durante el almacenamiento de los aceites crudos y refinados de las semillas de leguminosas silvestres: Prosopis juliflora (mezquite, Mimosa grahamii (gatuña, Acacia constricta (vinorama, Olneya tesota (palo fierro, Cercidium praecox (palo de brea y Parkinsonia aculeata (palo verde. Los aceites de maíz y soja fueron empleados como controles. Se determinó el índice de peróxido (I.P., de Yodo (I.I., de acidez (I.A, y valor de p-Anisidina (p-A durante 122 días de almacenamiento a temperatura ambiente. Los aceites crudos de leguminosas silvestres mostraron valores de estos índices similares a los del aceite de maíz crudo y menores que los del aceite de soja crudo. Este comportamiento también fue observado para los aceites refinados. El olor a rancio se presentó en el aceite de soja a los 5 días de almacenamiento, en el de vinorama a los 40 días, en el de mezquite, palo verde y palo de brea a los 62 días y en el de gatuña a los 135 días. Los valores

  5. Laguna Verde - A photo story

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-04-15

    Safety is one of the main factors in the construction and operation of a modern nuclear power plant. There are many barriers between the fission products produced in the fuel elements of the core, and the environment: the cladding of the fuel pins which are enclosed in the reactor core, the pressure vessel containing the core and which in turn is enclosed in the reactor containment, all this being located in a low-pressure secondary containment or reactor building. Despite these precautions, nuclear safety is still a widely-discussed issue. The important fact remains, however, that there has not been a single radiation-induced fatality or serious injury at any civilian nuclear power plant during 20 years of nuclear power generation. This includes the accident that occurred in March 1979 at the Three Mile Island nuclear plant in the USA. A substantial component contributing to safety in a nuclear power plant is the containment. The following photos of Laguna Verde, Mexico's first nuclear power station being constructed at Alta Lucero in Vera Cruz, give an impression of how strong this concrete and steel containment actually is. Laguna Verde consists of two 600 MWe units and the plant is scheduled for commercial operation in 1982. Construction began in 1974. Both units are boiling-water reactors. The photos show, in general, the construction of the primary containment for the reactors (the dry wells). The dry well contains the reactor itself and has two layers: the leak-tight steel liner and the heavy concrete building. The purpose of the primary containment is to retain steam and gases that might escape in an emergency and to direct these through relief tubes to a water pond for cooling. Surrounding this primary containment will be a reactor building which serves as a secondary low-pressure containment, able to operate at pressures up to 0.2 atmospheres.

  6. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde

    International Nuclear Information System (INIS)

    Salas M, B.

    2014-08-01

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  7. First fuel reload in Laguna Verde; Primera recarga de combustible en Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Bahena B, D

    1992-01-15

    A report containing the activities carried out during the first reload of nuclear fuel and major maintenance in the Laguna Verde nuclear reactor is presented. The previous and the specific activities are included. These last are related without including the technical considerations, data or the operation details, because these data were documented inside the registrations of the CFE, the ININ and in personal way. (Author)

  8. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Draft supplement to the Final environmental satement

    International Nuclear Information System (INIS)

    1975-11-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result from the proposed action. The pumping of groundwater will cause a local drawdown of about 1 ft/yr, less than that currently occurring; hence, the impact is considered acceptable. 1 fig., 20 tabs

  9. Validation of SIMULATE-3K for stability analysis of Laguna Verde nuclear plant

    Energy Technology Data Exchange (ETDEWEB)

    Castillo, Rogelio, E-mail: rogelio.castillo@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Alonso, Gustavo, E-mail: gustavo.alonso@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Instituto Politecnico Nacional, Unidad Profesional Adolfo Lopez Mateos, Ed. 9, Lindavista, D.F. 07300 (Mexico); Ramírez, J. Ramón, E-mail: ramon.ramirez@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico)

    2013-12-15

    Highlights: • Neutronic/thermal hydraulic event in Laguna Verde is modeled. • A good agreement is obtained between SIMULATE-3K results and data plant for frequency and DR. • Other noise analysis techniques are used for the same purpose with good agreement. • Validation of SIMULATE-3K for stability analysis of Laguna Verde is confirmed - Abstract: Boiling Water Reactors are two phase flow systems which are susceptible to different types of flow instabilities. Among these are the coupled neutronic/thermal-hydraulic instabilities, these may compromise established fuel safety limits. These instabilities are characterized by periodic core-power and hydraulic oscillations. SIMULATE-3K code has been tested for stability analysis for several benchmarks, however to qualify the SIMULATE-3K code for a particular power plant a specific reactor plant analysis must be done. In this paper, the plant model of Laguna Verde Nuclear Power Plant is built and SIMULATE-3K is tested against the 1995 coupled neutronic/thermal-hydraulic instability event of Laguna Verde. Results obtained show the adequacy of this code to specific Laguna Verde power plant stability analysis.

  10. Advanced light water reactor plants System 80+trademark design certification program. Annual progress report, October 1, 1994 - September 30, 1995

    International Nuclear Information System (INIS)

    1998-01-01

    The purpose of this report is to provide the status of the progress that was made towards Design Certification of System 80+trademark during the US government's 1995 fiscal year. The System 80+ Advanced Light Water Reactor (ALWR) is a 3931 MW (1350 MWe) Pressurized Water Reactor (PWR). The design covers an essentially complete plant. It is based on EPRI ALWR Utility Requirements Document (URD) improvements to the Standardized System 80 Nuclear Steam Supply System (NSSS) in operation at Palo Verde Units 1, 2, and 3. The NSSS is a traditional two-loop arrangement with two steam generators, two hot legs and four cold legs, each with a reactor coolant pump. The System 80+ standard design houses the NSSS in a spherical steel containment vessel which is enclosed in a concrete shield building, thus providing the safety advantages of a dual barrier to radioactivity release. Other major features include an all-digital, human-factors-engineered control room, an alternate electrical AC power source, an In-Containment Refueling Water Storage Tank (IRWST), and plant arrangements providing complete separation of redundant trains in safety systems

  11. Advanced light water reactor plants System 80+trademark design certification program. Annual progress report, October 1, 1995 - September 30, 1996

    International Nuclear Information System (INIS)

    1996-01-01

    The purpose of this report is to provide a status of the progress that was made towards Design Certification of System 80+trademark during the US government's 1996 fiscal year. The System 80+ Advanced Light Water Reactor (ALWR) is a 3931 MW (1350 MWe) Pressurized Water Reactor (PWR). The design covers an essentially complete plant. It is based on EPRI ALWR Utility Requirements Document (URD) improvements to the Standardized System 80 Nuclear Steam Supply System (NSSS) in operation at Palo Verde Units 1, 2 and 3. The NSSS is a traditional two-loop arrangement with two steam generators, two hot legs and four cold legs, each with a reactor coolant pump. The System 80+ standard design houses the NSSS in a spherical steel containment vessel which is enclosed in a concrete shield building, thus providing the safety advantages of a dual barrier to radioactivity release. Other major features include an all-digital, human-factors-engineered control room, an alternate electrical AC power source, an In-Containment Refueling Water Storage Tank (IRWST), and plant arrangements providing complete separation of redundant trains in safety systems

  12. To report the obtained results in the simulation with the FCS-11 and Presto codes of the two first operation cycles of the Laguna Verde Unit 1 reactor

    International Nuclear Information System (INIS)

    Montes T, J.L.; Moran L, J.M.; Cortes C, C.C.

    1990-08-01

    The objective of this work is to establish a preliminary methodology to carry out analysis of recharges for the reactor of the Laguna Verde U-1, by means of the evaluation of the state of the reactor core in its first two operation cycles using the FCS2 and Presto-B codes. (Author)

  13. Toimitila-, palo- ja pelastusturvallisuus majoitusyrityksessä

    OpenAIRE

    Pajunen, Touko

    2010-01-01

    Opinnäytetyö tehtiin erään Etelä-Savossa sijaitsevan hotellin hotellipäällikön toimeksiannosta. Työn tavoitteena oli kerätä tietoperusta toimitila-, palo- ja pelastusturvallisuudesta, ja laatia sen pohjalta turvallisuuskatsaus kyseisessä hotellissa. Turvallisuuskatsauksen tavoitteena oli nostaa esiin mahdollisia toimitila-, palo- ja pelastusturvallisuuteen liittyviä epäkohtia ja ehdottaa niihin ratkaisuja. Turvallisuuskatsaus koostui kahdesta tutkimuksesta. Ensimmäisessä arvioitiin toimit...

  14. Composición química y precursores de ácidos vaccénico y ruménico en especies forrajeras en Baja California Sur, México

    Directory of Open Access Journals (Sweden)

    Eduardo Alberto Toyes-Vargas

    2013-01-01

    Full Text Available Los rumiantes pequeños que pastorean la vegetación nativa seleccionan su dieta a partir de una amplia variedad de especies vegetales, que difieren en su contenido y disponibilidad de nutrientes durante el año, y son fuente importante de nutrientes. El objetivo del estudio fue determinar y comparar la composición bioquímica de especies forrajeras asociadas al agostadero de Baja California Sur. Las especies evaluadas fueron huizache, mezquite, palo fierro, palo verde y vinorama, así como alfalfa henificada. Se cuantificó el contenido de materia seca, proteína cruda, lípidos totales, fibra cruda, cenizas, extracto libre de nitrógeno y energía bruta, así como la concentración de ácido linoléico, ácido -linolénico y ácidos grasos poliinsaturados ARA, EPA y DHA. Los resultados muestran que el palo verde y el mezquite presentaron un contenido mayor de proteína cruda. El huizache mostró la concentración mayor de lípidos totales, seguido de palo verde y mezquite. Huizache y alfalfa henificada presentaron las concentraciones mayores de ácido linoleico; mientras que palo verde alcanzó los niveles más altos de ácido alfa linolénico, seguido por palo fierro y alfalfa henificada. Palo verde, palo fierro y alfalfa henificada obtuvieron concentraciones mayores de ácidos grasos poliinsaturados. El uso de los forrajes de agostadero en la alimentación de los rumiantes es una alternativa que podrá modificar las proporciones de los ácidos grasos de la leche dado el contenido del ácido oleico, linoléico y linolénico, precursores del ácido vaccénico y ruménico y ácidos grasos poliinsaturados de la serie omega 3 como el EPA y el DHA.

  15. Advanced light water reactor plants System 80+{trademark} design certification program. Annual progress report, October 1, 1994--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    The purpose of this report is to provide the status of the progress that was made towards Design Certification of System 80+{trademark} during the US government`s 1995 fiscal year. The System 80+ Advanced Light Water Reactor (ALWR) is a 3931 MW (1350 MWe) Pressurized Water Reactor (PWR). The design covers an essentially complete plant. It is based on EPRI ALWR Utility Requirements Document (URD) improvements to the Standardized System 80 Nuclear Steam Supply System (NSSS) in operation at Palo Verde Units 1, 2, and 3. The NSSS is a traditional two-loop arrangement with two steam generators, two hot legs and four cold legs, each with a reactor coolant pump. The System 80+ standard design houses the NSSS in a spherical steel containment vessel which is enclosed in a concrete shield building, thus providing the safety advantages of a dual barrier to radioactivity release. Other major features include an all-digital, human-factors-engineered control room, an alternate electrical AC power source, an In-Containment Refueling Water Storage Tank (IRWST), and plant arrangements providing complete separation of redundant trains in safety systems.

  16. Caracterización fisicoquímica de los aceites crudos de algunas semillas de leguminosas del desierto sonorense

    Directory of Open Access Journals (Sweden)

    Ortega-Nieblas, M.

    1995-02-01

    Full Text Available The Sonoran desert has a great variety of nutritional native plants, mainly from the leguminous family. Although in ancient times their products were used as food by native Americans, there is little information about their potential as a food source. For this reason, oils from the following seeds were studied: Acacia famesiana (huizache, Mimosa grahamii (gatuña, Cercidium microphyilium (palo verde 1, Cercidium sonorae (brea, Parkinsonia aculeata (palo verde 2, Olneya Tesota (palo fierro and Prosopis juliflora (mezquite.
    Oils were extracted from the seeds with hexane, and contents ranged from 8.5 to 23.5 %. The physicochemical studies showed mostly unsaturated oils, as demonstrated by the iodine index, (101-147 units. Indexes of acidity, peroxides and free fatty acids were low and within the accepted values. Fatty acids were separated and quantified by gas chromatography. Linoleic and oleic acids were found to predominate. All extracted crude oils were of good quality, comparable to those from soybean, com, sunflower and carthamus.

    El desierto de Sonora cuenta con una gran variedad de plantas silvestres principalmente de la familia leguminosae de las cuales se tiene poca información acerca de su potencial como fuente nutricional. Por lo que se estudiaron los aceites de las semillas: Acacia famesiana (huizache, Mimosa grahamii (gatuña, Cercidium microphyilium (palo verde 1, Cercidium sonorae (brea, Parkinsonia aculeata (palo verde 2, Olneya Tesota (palo fierro y Prosopis juliflora (mezquite.
    Los aceites de cada semilla se extrajeron con hexano, obteniéndose de 8.5 a 23.5 %. Estos mostraron un alto grado de insaturación reflejado en los índices de lodo, de 101 a 147. Los índices de acidez, peróxidos y ácidos grasos libres fueron bajos y dentro de los valores aceptables. Al cuantificar los ácidos grasos por

  17. First fuel reload in Laguna Verde

    International Nuclear Information System (INIS)

    Bahena B, D.

    1992-01-01

    A report containing the activities carried out during the first reload of nuclear fuel and major maintenance in the Laguna Verde nuclear reactor is presented. The previous and the specific activities are included. These last are related without including the technical considerations, data or the operation details, because these data were documented inside the registrations of the CFE, the ININ and in personal way. (Author)

  18. Laguna Verde nuclear power plant: an experience to consider in advanced BWR design

    International Nuclear Information System (INIS)

    Fuentes Marquez, L.

    2001-01-01

    Laguna Verde is a BWR 5 containment Mark II. Designed by GE, two external re-circulation loops, each of them having two speed re-circulation pump and a flow control valve to define the drive flow and consequently the total core flow an power control by total core flow. Laguna Verde Design and operational experience has shown some insights to be considering in design for advanced BRW reactors in order to improve the potential of nuclear power plants. NSSS and Balance of plant design, codes used to perform nuclear core design, margins derived from engineering judgment, at the time Laguna Verde designed and constructed had conducted to have a plant with an operational license, generating with a very good performance and availability. Nevertheless, some design characteristics and operational experience have shown that potential improvements or areas of opportunity shall be focused in the advanced BWR design. Computer codes used to design the nuclear core have been evolved relatively fast. The computers are faster and powerful than those used during the design process, also instrumentation and control are becoming part of this amazing technical evolution in the industry. The Laguna Verde experience is the subject to share in this paper. (author)

  19. Analysis of the three dimensional core kinetics NESTLE code coupling with the advanced thermo-hydraulic code systems, RELAP5/SCDAPSIM and its application to the Laguna Verde Central reactor

    International Nuclear Information System (INIS)

    Salazar C, J.H.; Nunez C, A.; Chavez M, C.

    2004-01-01

    The objective of the written present is to propose a methodology for the joining of the codes RELAP5/SCDAPSIM and NESTLE. The development of this joining will be carried out inside a doctoral program of Engineering in Energy with nuclear profile of the Ability of Engineering of the UNAM together with the National Commission of Nuclear Security and Safeguards (CNSNS). The general purpose of this type of developments, is to have tools that are implemented by multiple programs or codes such a that systems or models of the three-dimensional kinetics of the core can be simulated and those of the dynamics of the reactor (water heater-hydraulics). In the past, by limitations for the calculation of the complete answer of both systems, the developed models they were carried out for separate, putting a lot of emphasis in one but neglecting the other one. These methodologies, calls of better estimate, will be good to the nuclear industry to evaluate, with more high grades of detail, the designs of the nuclear power plant (for modifications to those already existent or for new concepts in the designs of advanced reactors), besides analysing events (transitory and have an accident), among other applications. The coupled system was applied to design studies and investigation of the Laguna Verde Nuclear power plant (CNLV). (Author)

  20. 36 CFR 7.39 - Mesa Verde National Park.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Mesa Verde National Park. 7... SPECIAL REGULATIONS, AREAS OF THE NATIONAL PARK SYSTEM § 7.39 Mesa Verde National Park. (a) Visiting of... the admission of commercial automobiles and buses to Mesa Verde National Park, contained in § 5.4 of...

  1. Ouro Verde MG 2: nova cultivar de mungo-verde para Minas Gerais Ouro Verde MG 2: new mungbean cultivar for Minas Gerais State, Brazil

    Directory of Open Access Journals (Sweden)

    Rogério F. Vieira

    2002-03-01

    Full Text Available Dentre várias linhagens introduzidas do "Asian Vegetable Research and Development Center" (AVRDC, sobressaiu a linhagem VC 3984-B-2-B-4-1-B, que recebeu o nome de Ouro Verde MG 2. Suas sementes são verde-brilhantes e o peso de 1000 unidades varia de 43 a 51 g. O início da floração ocorre em torno de 33 dias após a emergência e a primeira vagem madura surge entre 23 e 33 dias. Por se tratar de espécie de maturação desuniforme, podem ser necessárias duas a quatro colheitas. As plantas podem atingir 95 cm de altura. As vagens são marrom-escuras e concentram-se na parte superior da planta. É suscetível a duas doenças que geralmente aparecem no final do ciclo de vida do mungo-verde: míldio-pulverulento (Erysiphe polygoni e mancha-foliar-de-cercospora (Cercospora canescens. A 'Ouro Verde MG 2' é resistente ao acamamento, e o seu rendimento, em três ensaios instalados em dezembro, janeiro e fevereiro, variou de 1,5 a 2,0 t/ha. Esses rendimentos foram, em média, 12% superior ao da cultivar Ouro Verde.Among many accessions introduced from Asian Vegetable Research and Development Center (AVRDC, the VC 3984-B-2-B-4-1-B stood out and was named 'Ouro Verde MG 2'. The seeds are bright green and 1000-seed weight ranges from 43 to 51 g. Flowering starts approximately 33 days after emergence and the first pod ripens between 23 and 33 days later. As mungbean is a non-uniform maturation species, two to four harvests could be necessary. The plant can reach 95 cm high. The pods are dark brown and concentrated in the upper canopy. This cv. is susceptible to two diseases which generally appear late in the crop: powdery mildew (Erysiphe polygoni and cercospora leaf spot (Cercospora canescens. 'Ouro Verde MG 2' is resistant to lodging. The yield measured in three experiments carried out in December, January, and February, ranged from 1.5 to 2.0 t/ha. In average, these yields were 12% superior than the achieved by the cultivar 'Ouro Verde'.

  2. Laguna Verde: the nuclear debate in Mexico

    International Nuclear Information System (INIS)

    Weinberg, Bill.

    1987-01-01

    Mexico in planning to start up its first nuclear power station at Laguna Verde in the state of Veracruz (1988). The history of the plant is traced; it should have been finished by 1974. Both the fuel and the technology have been imported from the United States for Laguna Verde. The design, a Mark II Boiling Water Reactor, is controversial and there are doubts as to its safety. Opposition to the plant on safety and environmental grounds has grown. In April 1987 a 'Chernobyl anniversary' demonstration had 10,000 protesters and opponents of the plant are becoming more militant. The main opposition is from environmental and 'Green' groups but also includes intellectuals. However, politically, Mexico would find it embarrassing to cancel the plant and also it wants to be seen as a 'First World' rather than a 'Third World' country. (U.K.)

  3. Design optimization for fuel reloading in Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Cortes Campos, C.C.; Montes Tadeo, J.L.

    1991-01-01

    Procedure followed to perform the design optimation in fuel reloading is described in general words and also is shown an example in which such procedure was uses for analysis of BWR type reactor in unit 1 of Laguna Verde nuclear power plant (Author)

  4. Petroleum geology of the Palo Duro Basin, Texas Panhandle

    International Nuclear Information System (INIS)

    Rose, P.R.

    1986-03-01

    The Palo Duro Basin, Permian Basin, Texas is an asymmetric, relatively shallow, intracratonic basin in the southern Texas Panhandle filled mostly by Mississippian, Pennsylvanian, and Permian sedimentary rocks. Although deeper and prolific prolific petroleum-producing basins adjoin it on the north (Anadarko Basin), south (Midland Basin), and east (Hardeman Basin), the Palo Duro Basin has produced remarkably small amounts of oil and gas to date. This is all the more noteworthy because the sedimentary sequence and rock types of the basin are similar to those of the adjacent basins. Analyses of the stratigraphic succession and structural configuration of the Palo Duro Basin suggest that adequate reservoir rocks, top-seals, and geologic structures are present. Most of the structures formed early enough to have trapped hydrocarbons if they were migrating in the rock column. Although additional work is under way to properly address the question of the petroleum source rocks, generation, and migration, the general absence of production in the basin may relate to an overall deficiency in hydrocarbon generation within the basin. Geologic information in this report will form part of the basis for further analysis and conclusions on hydrocarbon potential in the Palo Duro Basin

  5. Analysis of the Power oscillations event in Laguna Verde Nuclear Power Plant. Preliminary Report

    International Nuclear Information System (INIS)

    Gonzalez M, V.M.; Amador G, R.; Castillo, R.; Hernandez, J.L.

    1995-01-01

    The event occurred at Unit 1 of Laguna Verde Nuclear Power Plant in January 24, 1995, is analyzed using the Ramona 3 B code. During this event, Unit 1 suffered power oscillation when operating previous to the transfer at high speed recirculating pumps. This phenomenon was timely detected by reactor operator who put the reactor in shut-down doing a manual Scram. Oscillations reached a maximum extent of 10.5% of nominal power from peak to peak with a frequency of 0.5 Hz. Preliminary evaluations show that the event did not endangered the fuel integrity. The results of simulating the reactor core with Ramona 3 B code show that this code is capable to moderate reactor oscillations. Nevertheless it will be necessary to perform a more detailed simulation of the event in order to prove that the code can predict the beginning of oscillations. It will be need an additional analysis which permit the identification of factors that influence the reactor stability in order to express recommendations and in this way avoid the recurrence of this kind of events. (Author)

  6. Major salt beds of the Palo Duro and Dalhart Basins, Texas

    International Nuclear Information System (INIS)

    1983-12-01

    Major salt beds are defined as salt intervals at least 75 feet thick that contain no interbeds greater than 10 feet thick and include no more than 15 percent non-salt interbeds. Maps based on the interpretation of geophysical logs from hundreds of oil and gas exploration wells reveal seven major salt beds in the Palo Duro Basin and one major salt bed in the Dalhart Basin. The most extensive major salt beds are in the central and northern Palo Duro Basin, in the Upper San Andres Formation and the Lower San Andres Formation Units 4 and 5. Of these, the major salt bed within the Lower San Andres Formation Unit 4 is the most widespread and generally the thickest. 7 references, 15 figures, 2 tables

  7. Perekond on kõige tähtsam / Urve Palo

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2007-01-01

    Ilmunud ka: Hiiu Leht, 21. dets. 2007, lk. 2; Pärnu Postimees, 21. dets. 2007, lk. 15; Severnoje Poberezhje, 21. dets. 2007, lk. 2; Nädalaleht, 21. dets. 2007, lk. 2; Koit, 22. dets. 2007, lk. 6; Meie Maa, 22. dets. 2007, lk. 2; Molodjozh Estonii, 29. dets. 2007, lk. 4; Võrumaa Teataja, 5. jaan. 2008, lk. 3; Järva Teataja, 5. jaan. 2008, lk. 2. Rahvastikuminister Urve Palo jõulu- ja aastalõputervitus

  8. Components production and assemble of the irradiation capsule of the Surveillance Program of Materials of the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Medrano, A.

    2009-01-01

    To predict the effects of the neutrons radiation and the thermal environment about the mechanical properties of the reactor vessel materials of the nuclear power plant of Laguna Verde, a surveillance program is implemented according to the outlines settled by Astm E185-02 -Standard practice for design of surveillance programs for light-water moderated nuclear power reactor vessels-. This program includes the installation of three irradiation capsules of similar materials to those of the reactor vessels, these samples are test tubes for mechanical practices of impact and tension. In the National Institute of Nuclear Research and due to the infrastructure as well as of the actual human resources of the Pilot Plant of Nuclear Fuel Assembles Production it was possible to realize the materials rebuilding extracted in 2005 of Unit 2 of nuclear power plant of Laguna Verde as well as the production, assemble and reassignment of the irradiation capsule made in 2006. At the present time the surveillance materials extracted in 2008 of Unit 1 of the nuclear power plant of Laguna Verde are reconstituting and the components are manufactured for the assembles of the irradiation capsule that will be reinstalled in the reactor vessel in 2010. The purpose of the present work is to describe the necessary components as well as its disposition during the assembles of the irradiation capsule for the surveillance program of the reactors vessel of the nuclear power plant of Laguna Verde. (Author)

  9. Study and characterization of noble metal deposits on similar rusty surfaces to those of the reactor U-1 type BWR of nuclear power station of Laguna Verde; Estudio y caracterizacion de depositos de metales nobles sobre superficies oxidadas similares a las del reactor de la Central de Laguna Verde (CNLV) U1 del tipo BWR

    Energy Technology Data Exchange (ETDEWEB)

    Flores S, V. H.

    2011-07-01

    In the present investigation work, were determined the parameters to simulate the conditions of internal oxidation reactor circulation pipes of the nuclear power plant of Laguna Verde in Veracruz. We used 304l stainless steel cylinders with two faces prepared with abrasive paper of No. 600, with the finality to obtain similar surface to the internal circulation piping nuclear reactor. Oxides was formed within an autoclave (Autoclave MEX-02 unit B), which is a device that simulates the working conditions of the nuclear reactor, but without radiation generated by the fission reaction within the reactor. The oxidation conditions were a temperature of 280 C and pressure of 8 MPa, similar conditions to the reactor operating in nuclear power plant of Laguna Verde in Veracruz, Mexico (BWR conditions), with an average conductivity of 4.58 ms / cm and 2352 ppb oxygen to simulate normal water chemistry NWC. Were obtained deposits of noble metal oxides formed on 304l stainless steel samples, in a 250 ml autoclave at a temperature range of 180 to 200 C. The elements that were used to deposit platinum-rhodium (Pt-Rh) with aqueous Na{sub 2}Pt (OH){sub 6} and Na{sub 3}Rh (NO{sub 2}){sub 6}, Silver (Ag) with an aqueous solution of AgNO{sub 3}, zirconium (Zr) with aqueous Zr O (NO{sub 3}) and ZrO{sub 2}, and zinc (Zn) in aqueous solution of Zn (NO{sub 3}){sub 2} under conditions of normal water chemistry. Also there was the oxidation of 304l stainless steel specimens in normal water chemistry with a solution of Zinc (Zn) (NWC + Zn). Oxidation of the specimens in water chemistry with a solution of zinc (Zn + NWC) was prepared in two ways: within the MEX-02 autoclave unit A in a solution of zinc and a flask at constant temperature in zinc solution. The oxides formed and deposits were characterized by scanning electron microscopy, energy dispersive X-ray analysis, elemental field analysis and X-ray diffraction. By other hand was evaluated the electrochemical behavior of the oxides

  10. Prototype fuel fabrication for nuclear reactors of Laguna Verde

    International Nuclear Information System (INIS)

    Nocetti, C.; Torres, J.; Medrano, A.

    1996-01-01

    Four prototype fuel bundles for the Laguna Verde Nuclear Power Plant have been fabricated. the type of nuclear fuel produced is described and the process used is commented. As an example of the fabrication criteria adopted, the production model to determine the density of the U O 2 pellets for the different batches of ceramic powder is described. the results are evaluated using the statistical indexes C p and C pk . (author)

  11. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, K.R.

    1995-09-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2.

  12. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Parrish, K.R.

    1995-01-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2

  13. The Bridges SOI Model School Program at Palo Verde School, Palo Verde, Arizona.

    Science.gov (United States)

    Stock, William A.; DiSalvo, Pamela M.

    The Bridges SOI Model School Program is an educational service based upon the SOI (Structure of Intellect) Model School curriculum. For the middle seven months of the academic year, all students in the program complete brief daily exercises that develop specific cognitive skills delineated in the SOI model. Additionally, intensive individual…

  14. Engineering evaluation of a formerly utilized MED/AEC site. Site A and Plot M, Palos Forest Preserve, Palos Park, Illinois

    International Nuclear Information System (INIS)

    1979-09-01

    This engineering evaluation report (EER) addresses one of these MED/AEC sites known as Site A/Plot M, located in Palos Park, Illinois. The EER describes in technical detail a number of options for remedial action that could be taken with respect to the contamination at Site A/Plot M and presents estimates of the costs associated with these options. A companion document, Environmental Analysis Report on a Formerly Utilized MED/AEC Site, Site A and Plot M, Palos Forest Preserve, Palos Park, Illinois (ANL/ES-79), has also been prepared. It describes in detail the existing site environment and evaluates the environmental impacts of the various remedial options discussed in this report. This EER contributes to a better understanding of the mitigation or resolution of environmental problems posed by the subject MED/AEC site and serves as a basis for determining whether or not remedial actions are warranted. The knowledge derived from the evaluation of a number of remedial options should be helpful in the final disposition of other MED/AEC sites located elsewhere

  15. Repository site data and information in bedded salt: Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Tien, P.; Nimick, F.B.; Muller, A.B.; Davis, P.A.; Guzowski, R.V.; Duda, L.E.; Hunter, R.L.

    1983-11-01

    This report is a compilation of data from the literature on the Palo Duro Basin. The Palo Duro Basin is a structural basin, about 150 miles long and 80 miles wide, that is a part of the much larger Permian Basin. The US Department of Energy is investigating the Palo Duro Basin as a potentially suitable area for the site of a repository for the disposal of high-level radioactive waste. Sediments overlying the Precambrian basement range from about 5000 to about 11,000 ft in thickness and from Cambrian to Holocene in age. The strata in the Palo Duro Basin that are of primary interest to the Department of Energy are the bedded salts of the Permian San Andres Formation. The total thickness of the bedded salts is about 2000 ft. The geology of the Palo Duro Basin is well understood. A great deal of information exists on the properties of salt, although much of the available information was not collected in the Palo Duro Basin. Mineral resources are not currently being exploited from the center of the Palo Duro Basin at depth, although the possibility of exploration for and development of such resources can not be ruled out. The continued existence of salts of Permian age indicates a lack of any large amount of circulating ground water. The hydrology of the pre-Tertiary rocks, however, is currently too poorly understood to carry out detailed, site-specific hydrologic modeling with a high degree of confidence. In general, ground water flows from west to east in the Basin. There is little or no hydraulic connection between aquifers above and below the salt sequences. Potable water is pumped from the Ogallala aquifer. Most of the other aquifers yield only nonpotable water. More extensive hydrological data are needed for detailed future modeling in support of risk assessment for a possible repository for high-level waste in the Palo Duro Basin. 464 references

  16. Fuel management inside the reactor. Report of generation of the nuclear bank for the fuel of the initial load of the Laguna Verde U-1 reactor with the FMS codes; Administracion de combustible dentro del reactor. Reporte de generacion del banco nuclear para el combustible de la carga inicial del reactor de Laguna Verde U-1 con los codigos del FMS

    Energy Technology Data Exchange (ETDEWEB)

    Alonso V, G. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico); Torres A, C. [CFE, Veracruz (Mexico)

    1991-06-15

    In this work in a general way the form in that it was generated the database of the initial fuel load of the Laguna Verde Unit 1 reactor is described. The initial load is formed with fuel of the GE6 type. The obtained results during the formation of the database in as much as to the behavior of the different cell parameters regarding the one burnt of the fuel and the variation of vacuums in the coolant channel its are compared very favorably with those reported by the General Electric fuel supplier and reported in the design documents of the same one. (Author)

  17. Gamma thermometer longevity test: Laguna Verde 2 instruments recent performance

    International Nuclear Information System (INIS)

    Cuevas V, G.; Avila N, A.; Calleros M, G.

    2013-10-01

    This paper is informative of the General Electric Hitachi and Global Nuclear Fuel - Americas are collaboration with Comision Federal de Electricidad in a longevity test of thermocouples as power monitoring devices. The test conclusions will serve for final engineering design in detailing the Automated Fixed In-core Probes for calibration of the Local Power Range Monitors (LPRMs) of the Economic Simplified Boiling Water Reactor. This paper introduces the collaboration description and some recent performance evaluation of the thermocouples that are sensitive to gamma radiation and are known generically as Gamma Thermometers (G T). The G Ts in Laguna Verde 2 are radially located inside six instrumentation tubes in the core and consist of seven thermocouples, four are aligned with the LPRM heights and three are axially located between LPRM heights. The Laguna Verde 2 G T test has become the longest test of thermocouples as power monitoring devices in a BWR industry history and confirms their reliability in terms of time-dependent small noise under steady state reactor conditions and good agreement against Traversing In-core Probes power measurements. (Author)

  18. Gamma thermometer longevity test: Laguna Verde 2 instruments recent performance

    Energy Technology Data Exchange (ETDEWEB)

    Cuevas V, G. [Global Nuclear Fuel, Americas, 3901 Castle Hayne Road, Wilmington, North Carolina (United States); Avila N, A.; Calleros M, G., E-mail: Gabriel.Cuevas-Vivas@gnf.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verda, Carretera Veracruz-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2013-10-15

    This paper is informative of the General Electric Hitachi and Global Nuclear Fuel - Americas are collaboration with Comision Federal de Electricidad in a longevity test of thermocouples as power monitoring devices. The test conclusions will serve for final engineering design in detailing the Automated Fixed In-core Probes for calibration of the Local Power Range Monitors (LPRMs) of the Economic Simplified Boiling Water Reactor. This paper introduces the collaboration description and some recent performance evaluation of the thermocouples that are sensitive to gamma radiation and are known generically as Gamma Thermometers (G T). The G Ts in Laguna Verde 2 are radially located inside six instrumentation tubes in the core and consist of seven thermocouples, four are aligned with the LPRM heights and three are axially located between LPRM heights. The Laguna Verde 2 G T test has become the longest test of thermocouples as power monitoring devices in a BWR industry history and confirms their reliability in terms of time-dependent small noise under steady state reactor conditions and good agreement against Traversing In-core Probes power measurements. (Author)

  19. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  20. Analysis of the micro-structural damages by neutronic irradiation of the steel of reactor vessels of the nuclear power plant of Laguna Verde. Characterization of the design steel; Analisis de los danos micro-estructurales por irradiacion neutronica del acero de la vasija de los reactores de la Central Nuclear de Laguna Verde. Caracterizacion del acero de diseno

    Energy Technology Data Exchange (ETDEWEB)

    Moranchel y Rodriguez, M.; Garcia B, A. [IPN, Escuela Superior de Fisica y Matematicas, Departamento de Fisica, Av. Luis Enrique Erro s/n, Unidad Profesional Adolfo Lopez Mateos, Col. Lindavista, 07738 Mexico D. F. (Mexico); Longoria G, L. C., E-mail: mmoranchel@ipn.m [ININ, Direccion de Investigacion Cientifica, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2010-09-15

    The vessel of a nuclear reactor is one of the safety barriers more important in the design, construction and operation of the reactor. If the vessel results affected to the grade of to have fracture and/or cracks it is very probable the conclusion of their useful life in order to guarantee the nuclear safety and the radiological protection of the exposure occupational personnel, of the public and the environment avoiding the exposition to radioactive sources. The materials of the vessel of a nuclear reactor are exposed continually to the neutronic irradiation that generates the same nuclear reactor. The neutrons that impact to the vessel have the sufficient energy to penetrate certain depth in function of the energy of the incident neutron until reaching the repose or to be absorbed by some nucleus. In the course of their penetration, the neutrons interact with the nuclei, atoms, molecules and with the same crystalline nets of the vessel material producing vacuums, interstitial, precipitate and segregations among other defects that can modify the mechanical properties of the steel. The steel A533-B is the material with which is manufactured the vessel of the nuclear reactors of nuclear power plant of Laguna Verde, is an alloy that, among other components, it contains atoms of Ni that if they are segregated by the neutrons impact this would favor to the cracking of the same vessel. This work is part of an investigation to analyze the micro-structural damages of the reactor vessels of the nuclear power plant of Laguna Verde due to the neutronic irradiation which is exposed in a continuous way. We will show the characterization of the design steel of the vessel, what offers a comprehension about their chemical composition, the superficial topography and the crystalline nets of the steel A533-B. It will also allow analyze the existence of precipitates, segregates, the type of crystalline net and the distances inter-plains of the design steel of the vessel. (Author)

  1. DOE plutonium disposition study: Analysis of existing ABB-CE Light Water Reactors for the disposition of weapons-grade plutonium

    International Nuclear Information System (INIS)

    1994-01-01

    Core reactivity and basic fuel management calculations were conducted on the selected reactors (with emphasis on the System 80 units as being the most desirable choice). Methods used were identical to those reported in the Evolutionary Reactor Report. From these calculations, the basic mission capability was assessed. The selected reactors were studied for modification, such as the addition of control rod nozzles to increase rod worth, and internals and control system modifications that might also be needed. Other system modifications studied included the use of enriched boric acid as soluble poison, and examination of the fuel pool capacities. The basic geometry and mechanical characteristics, materials and fabrication techniques of the fuel assemblies for the selected existing reactors are the same as for System 80+. There will be some differences in plutonium loading, according to the ability of the reactors to load MOX fuel. These differences are not expected to affect licensability or EPA requirements. Therefore, the fuel technology and fuel qualification sections provided in the Evolutionary Reactor Report apply to the existing reactors. An additional factor, in that the existing reactor availability presupposes the use of that reactor for the irradiation of Lead Test Assemblies, is discussed. The reactor operating and facility licenses for the operating plants were reviewed. Licensing strategies for each selected reactor were identified. The spent fuel pool for the selected reactors (Palo Verde) was reviewed for capacity and upgrade requirements. Reactor waste streams were identified and assessed in comparison to uranium fuel operations. Cost assessments and schedules for converting to plutonium disposition were estimated for some of the major modification items. Economic factors (incremental costs associated with using weapons plutonium) were listed and where possible under the scope of work, estimates were made

  2. Advanced Placement Program at Palo Verde College.

    Science.gov (United States)

    Twitchell, Theodore G.

    This study reports the outcome of an initial implementation of a California law permitting mentally gifted high school students to attend a junior college part time. The program procedure is described in terms of (1) selection and enrollment, (2) discipline, (3) books, (4) matters relating to high school graduation, (5) information for parents,…

  3. Fluid-Induced Vibration Analysis for Reactor Internals Using Computational FSI Method

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Jong Sung; Yi, Kun Woo; Sung, Ki Kwang; Im, In Young; Choi, Taek Sang [KEPCO E and C, Daejeon (Korea, Republic of)

    2013-10-15

    This paper introduces a fluid-induced vibration analysis method which calculates the response of the RVI to both deterministic and random loads at once and utilizes more realistic pressure distribution using the computational Fluid Structure Interaction (FSI) method. As addressed above, the FIV analysis for the RVI was carried out using the computational FSI method. This method calculates the response to deterministic and random turbulence loads at once. This method is also a simple and integrative method to get structural dynamic responses of reactor internals to various flow-induced loads. Because the analysis of this paper omitted the bypass flow region and Inner Barrel Assembly (IBA) due to the limitation of computer resources, it is necessary to find an effective way to consider all regions in the RV for the FIV analysis in the future. Reactor coolant flow makes Reactor Vessel Internals (RVI) vibrate and may affect the structural integrity of them. U. S. NRC Regulatory Guide 1.20 requires the Comprehensive Vibration Assessment Program (CVAP) to verify the structural integrity of the RVI for Fluid-Induced Vibration (FIV). The hydraulic forces on the RVI of OPR1000 and APR1400 were computed from the hydraulic formulas and the CVAP measurements in Palo Verde Unit 1 and Yonggwang Unit 4 for the structural vibration analyses. In this method, the hydraulic forces were divided into deterministic and random turbulence loads and were used for the excitation forces of the separate structural analyses. These forces are applied to the finite element model and the responses to them were combined into the resultant stresses.

  4. Talento verde y cadenas de suministro verdes: ¿existe una relación significativa?

    Directory of Open Access Journals (Sweden)

    María del Carmen Torres-Salazar

    2016-01-01

    Full Text Available Introducción: En este texto se presentan resultados estadísticos de la relación entre directivos con características de talento verde y la implementación de prácticas de cadena de suministro verde. Debido a que existen investigaciones sobre la importancia de la visión de la alta dirección para la adopción de prácticas verdes; y sin embargo ninguna da cuenta de las características personales del directivo, ni tampoco de la relación significativa entre estas características y la puesta en marcha de prácticas de cadena de suministro verde, esta es la aportación de la presente investigación. El trabajo se desarrolló en empresas manufactureras con más de diez trabajadores de la zona oriente del estado de Morelos México. La caracterización del término talento verde se reportó en el artículo, Talento verde: caracterización y búsqueda, publicado en el número 14 de esta revista. Método: El método utilizado consistió en la construcción de una encuesta dividida en tres categorías que posteriormente se convirtieron en variables: prácticas de cadena de suministro verde, presiones institucionales y talento verde. Las dos primeras se adaptaron de la encuesta de Zhu y Sarkis (2007 y la tercera surgió de la representación social de talento verde, producto de una fase de esta investigación. La encuesta se validó con un grupo de empresarios miembros de la Cámara Nacional de la Industria de la Transformación (CANACINTRA capítulo Morelos. El instrumento validado se aplicó a 26 directivos de empresas manufactureras con más de diez trabajadores de la zona oriente de Morelos, con el fin de probar la relación entre directivos con características de talento verde y la puesta en marcha de prácticas de cadena de suministro verde. Para ello se utilizaron como herramientas estadísticas la correlación de Pearson y la regresión lineal múltiple. Resultados: Las prácticas de cadena de suministro verde de las empresas

  5. Potential depletion of surface water in the Colorado River and agricultural drains by groundwater pumping in the Parker-Palo Verde-Cibola area, Arizona and California

    Science.gov (United States)

    Leake, Stanley A.; Owen-Joyce, Sandra J.; Heilman, Julian A.

    2013-01-01

    Water use along the lower Colorado River is allocated as “consumptive use,” which is defined to be the amount of water diverted from the river minus the amount that returns to the river. Diversions of water from the river include surface water in canals and water removed from the river by pumping wells in the aquifer connected to the river. A complication in accounting for water pumped by wells occurs if the pumping depletes water in drains and reduces measured return flow in those drains. In that case, consumptive use of water pumped by the wells is accounted for in the reduction of measured return flow. A method is needed to understand where groundwater pumping will deplete water in the river and where it will deplete water in drains. To provide a basis for future accounting for pumped groundwater in the Parker-Palo Verde-Cibola area, a superposition model was constructed. The model consists of three layers of finite-difference cells that cover most of the aquifer in the study area. The model was run repeatedly with each run having a pumping well in a different model cell. The source of pumped water that is depletion of the river, expressed as a fraction of the pumping rate, was computed for all active cells in model layer 1, and maps were constructed to understand where groundwater pumping depletes the river and where it depletes drains. The model results indicate that if one or more drains exist between a pumping well location and the river, nearly all of the depletion will be from drains, and little or no depletion will come from the Colorado River. Results also show that if a well pumps on a side of the river with no drains in the immediate area, depletion will come from the Colorado River. Finally, if a well pumps between the river and drains that parallel the river, a fraction of the pumping will come from the river and the rest will come from the drains. Model results presented in this report may be considered in development or refinement of strategies

  6. Ultrasonic meters in the feedwater flow to recover thermal power in the reactor of nuclear power plant of Laguna Verde U1 and U2; Medidores ultrasonicos en el flujo de agua de alimentacion para recuperar potencia termica en el reactor de la Central Nuclear Laguna Verde U1 and U2

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F. [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)]. e-mail: francisco.tijerina@cfe.gob.mx

    2008-07-01

    The engineers in nuclear power plants BWRs and PWRs based on the development of the ultrasonic technology for the measurement of the mass, volumetric flow, density and temperature in fluids, have applied this technology in two primary targets approved by the NRC: the use for the recovery of thermal power in the reactor and/or to be able to realize an increase of thermal power licensed in a 2% (MUR) by 1OCFR50 Appendix K. The present article mentions the current problem in the measurement of the feedwater flow with Venturi meters, which affects that the thermal balance of reactor BWRs or PWRs this underestimated. One in broad strokes describes the application of the ultrasonic technology for the ultrasonic measurement in the flow of the feedwater system of the reactor and power to recover thermal power of the reactor. One is to the methodology developed in CFE for a calibration of the temperature transmitters of RTD's and the methodology for a calibration of the venturi flow transmitters using ultrasonic measurement. Are show the measurements in the feedwater of reactor of the temperature with RTD's and ultrasonic measurement, as well as the flow with the venturi and the ultrasonic measurement operating the reactor to the 100% of nominal thermal power, before and after the calibration of the temperature transmitters and flow. Finally, is a plan to be able to realize a recovery of thermal power of the reactor, showing as carrying out their estimations. As a result of the application of ultrasonic technology in the feedwater of reactor BWR-5 in Laguna Verde, in the Unit 1 cycle 13 it was recover an equivalent energy to a thermal power of 25 MWt in the reactor and an exit electrical power of 6 M We in the turbogenerator. Also in the Unit 2 cycle 10 it was recover an equivalent energy to a thermal power of 40 MWt in the reactor and an exit electrical power of 16 M We in the turbogenerator. (Author)

  7. Geophysical evidence for an extensive Pie de Palo Complex mafic-ultramafic belt, San Juan, Argentina

    Science.gov (United States)

    Chernicoff, Carlos J.; Vujovich, Graciela I.; van Staal, Cees R.

    2009-12-01

    The recent completion of a high-resolution aeromagnetic survey over the Pie de Palo uplift of the western Sierras Pampeanas has revealed an area of large magnetic anomalies associated with the Pie de Palo Complex. The Las Pirquitas thrust, which has transported and uplifted the Pie de Palo Complex, is recognized for at least 30 km in a roughly NE direction along the western boundary of the Pie de Palo Complex, beyond its limited outcrop. The type of sediments of the Caucete Group in the footwall of the Las Pirquitas thrust, which are regarded as the leading edge of the Precordillera terrane, are associated with much less pronounced magnetic anomalies. In addition, a conspicuous, NNE trending, broad magnetic high stands out in the survey, several kilometers to the east of the main outcrops of the Pie de Palo Complex; this broad magnetic anomaly bisects the Pie de Palo basement block, and continues further south at least as far as 32°S, the southern boundary of the latest aeromagnetic survey. This magnetic anomaly is interpreted to represent a structure corresponding to the Grenvillian Precordillera-Pie de Palo tectonic boundary zone, and would comprise the buried largest part of the mafic-ultramafic belt. The geophysical model of the magnetic data indicates that the boundary zone dips to the east, possibly suggesting the existence of a set of synthetic east dipping, west-verging thrusts, of which only one major structure (Las Pirquitas thrust) is exposed; the possibility of other slivers of upthrust boundary zone material cannot be excluded. It is considered that the Pie de Palo Complex represents a small sliver upthrust from the unexposed boundary zone material (containing highly magnetic mafic-ultramafic rocks). The east-dipping, west verging structures associated with the Pie de Palo Complex are suggested to represent an Ordovician reactivation of a Grenvillian suture zone developed when the Precordillera basement and Pie de Palo terrane docked; this

  8. DOE plutonium disposition study: Analysis of existing ABB-CE Light Water Reactors for the disposition of weapons-grade plutonium. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Core reactivity and basic fuel management calculations were conducted on the selected reactors (with emphasis on the System 80 units as being the most desirable choice). Methods used were identical to those reported in the Evolutionary Reactor Report. From these calculations, the basic mission capability was assessed. The selected reactors were studied for modification, such as the addition of control rod nozzles to increase rod worth, and internals and control system modifications that might also be needed. Other system modifications studied included the use of enriched boric acid as soluble poison, and examination of the fuel pool capacities. The basic geometry and mechanical characteristics, materials and fabrication techniques of the fuel assemblies for the selected existing reactors are the same as for System 80+. There will be some differences in plutonium loading, according to the ability of the reactors to load MOX fuel. These differences are not expected to affect licensability or EPA requirements. Therefore, the fuel technology and fuel qualification sections provided in the Evolutionary Reactor Report apply to the existing reactors. An additional factor, in that the existing reactor availability presupposes the use of that reactor for the irradiation of Lead Test Assemblies, is discussed. The reactor operating and facility licenses for the operating plants were reviewed. Licensing strategies for each selected reactor were identified. The spent fuel pool for the selected reactors (Palo Verde) was reviewed for capacity and upgrade requirements. Reactor waste streams were identified and assessed in comparison to uranium fuel operations. Cost assessments and schedules for converting to plutonium disposition were estimated for some of the major modification items. Economic factors (incremental costs associated with using weapons plutonium) were listed and where possible under the scope of work, estimates were made.

  9. The PALOS project and its significance for industrial application

    Energy Technology Data Exchange (ETDEWEB)

    Guzzella, L. [Swiss Federal Institute of Technology Zuerich (ETHZ), Institute for Measurement and Control Laboratory (IMRT), Zuerich (Switzerland); Spring, P. [Swiss Federal Institut of Technology Zuerich (ETHZ), Institut fuer Mess- und Regeltechnik, Zuerich (Switzerland)

    2001-07-01

    This report compiled by the Swiss Federal Institute of Technology ETH introduces the PALOS (PArt Load Optimised System) concept for a downsized supercharged engine. The authors note that a mid-class passenger car needs an average power at the wheel of only 4.5 kW for typical driving cycles. For acceleration from 0 to 100 km/h within 10 seconds, however, the same vehicle requires a wheel power of approximately 120 kW. Thus, the engine efficiency is low under part load driving conditions. The objectives of the PALOS project are discussed as are methods to increase engine systems efficiency. Close collaboration with industrial partners during the whole project that lead to a high level of know-how transfer from university to industry and vice versa is noted. Four PhD theses on the subject are summarised: Part-load optimised engine systems, engine thermo-management for fuel consumption reduction, optimal operation of CVT-based powertrains and mean value modelling of a pressure wave supercharger (PWS), including exhaust gas recirculation, is looked at.

  10. Study and characterization of noble metal deposits on similar rusty surfaces to those of the reactor U-1 type BWR of nuclear power station of Laguna Verde

    International Nuclear Information System (INIS)

    Flores S, V. H.

    2011-01-01

    In the present investigation work, were determined the parameters to simulate the conditions of internal oxidation reactor circulation pipes of the nuclear power plant of Laguna Verde in Veracruz. We used 304l stainless steel cylinders with two faces prepared with abrasive paper of No. 600, with the finality to obtain similar surface to the internal circulation piping nuclear reactor. Oxides was formed within an autoclave (Autoclave MEX-02 unit B), which is a device that simulates the working conditions of the nuclear reactor, but without radiation generated by the fission reaction within the reactor. The oxidation conditions were a temperature of 280 C and pressure of 8 MPa, similar conditions to the reactor operating in nuclear power plant of Laguna Verde in Veracruz, Mexico (BWR conditions), with an average conductivity of 4.58 ms / cm and 2352 ppb oxygen to simulate normal water chemistry NWC. Were obtained deposits of noble metal oxides formed on 304l stainless steel samples, in a 250 ml autoclave at a temperature range of 180 to 200 C. The elements that were used to deposit platinum-rhodium (Pt-Rh) with aqueous Na 2 Pt (OH) 6 and Na 3 Rh (NO 2 ) 6 , Silver (Ag) with an aqueous solution of AgNO 3 , zirconium (Zr) with aqueous Zr O (NO 3 ) and ZrO 2 , and zinc (Zn) in aqueous solution of Zn (NO 3 ) 2 under conditions of normal water chemistry. Also there was the oxidation of 304l stainless steel specimens in normal water chemistry with a solution of Zinc (Zn) (NWC + Zn). Oxidation of the specimens in water chemistry with a solution of zinc (Zn + NWC) was prepared in two ways: within the MEX-02 autoclave unit A in a solution of zinc and a flask at constant temperature in zinc solution. The oxides formed and deposits were characterized by scanning electron microscopy, energy dispersive X-ray analysis, elemental field analysis and X-ray diffraction. By other hand was evaluated the electrochemical behavior of the oxides formed on the surface of 304l stainless steel

  11. Fuel management inside the reactor. Report of generation of the nuclear bank for the fuel of the initial load of the Laguna Verde U-1 reactor with the FMS codes

    International Nuclear Information System (INIS)

    Alonso V, G.; Torres A, C.

    1991-06-01

    In this work in a general way the form in that it was generated the database of the initial fuel load of the Laguna Verde Unit 1 reactor is described. The initial load is formed with fuel of the GE6 type. The obtained results during the formation of the database in as much as to the behavior of the different cell parameters regarding the one burnt of the fuel and the variation of vacuums in the coolant channel its are compared very favorably with those reported by the General Electric fuel supplier and reported in the design documents of the same one. (Author)

  12. Analysis of the micro-structural damages by neutronic irradiation of the steel of reactor vessels of the nuclear power plant of Laguna Verde. Characterization of the design steel

    International Nuclear Information System (INIS)

    Moranchel y Rodriguez, M.; Garcia B, A.; Longoria G, L. C.

    2010-09-01

    The vessel of a nuclear reactor is one of the safety barriers more important in the design, construction and operation of the reactor. If the vessel results affected to the grade of to have fracture and/or cracks it is very probable the conclusion of their useful life in order to guarantee the nuclear safety and the radiological protection of the exposure occupational personnel, of the public and the environment avoiding the exposition to radioactive sources. The materials of the vessel of a nuclear reactor are exposed continually to the neutronic irradiation that generates the same nuclear reactor. The neutrons that impact to the vessel have the sufficient energy to penetrate certain depth in function of the energy of the incident neutron until reaching the repose or to be absorbed by some nucleus. In the course of their penetration, the neutrons interact with the nuclei, atoms, molecules and with the same crystalline nets of the vessel material producing vacuums, interstitial, precipitate and segregations among other defects that can modify the mechanical properties of the steel. The steel A533-B is the material with which is manufactured the vessel of the nuclear reactors of nuclear power plant of Laguna Verde, is an alloy that, among other components, it contains atoms of Ni that if they are segregated by the neutrons impact this would favor to the cracking of the same vessel. This work is part of an investigation to analyze the micro-structural damages of the reactor vessels of the nuclear power plant of Laguna Verde due to the neutronic irradiation which is exposed in a continuous way. We will show the characterization of the design steel of the vessel, what offers a comprehension about their chemical composition, the superficial topography and the crystalline nets of the steel A533-B. It will also allow analyze the existence of precipitates, segregates, the type of crystalline net and the distances inter-plains of the design steel of the vessel. (Author)

  13. Ultrasonic meters in the feedwater flow to recover thermal power in the reactor of nuclear power plant of Laguna Verde U1 and U2

    International Nuclear Information System (INIS)

    Tijerina S, F.

    2008-01-01

    The engineers in nuclear power plants BWRs and PWRs based on the development of the ultrasonic technology for the measurement of the mass, volumetric flow, density and temperature in fluids, have applied this technology in two primary targets approved by the NRC: the use for the recovery of thermal power in the reactor and/or to be able to realize an increase of thermal power licensed in a 2% (MUR) by 1OCFR50 Appendix K. The present article mentions the current problem in the measurement of the feedwater flow with Venturi meters, which affects that the thermal balance of reactor BWRs or PWRs this underestimated. One in broad strokes describes the application of the ultrasonic technology for the ultrasonic measurement in the flow of the feedwater system of the reactor and power to recover thermal power of the reactor. One is to the methodology developed in CFE for a calibration of the temperature transmitters of RTD's and the methodology for a calibration of the venturi flow transmitters using ultrasonic measurement. Are show the measurements in the feedwater of reactor of the temperature with RTD's and ultrasonic measurement, as well as the flow with the venturi and the ultrasonic measurement operating the reactor to the 100% of nominal thermal power, before and after the calibration of the temperature transmitters and flow. Finally, is a plan to be able to realize a recovery of thermal power of the reactor, showing as carrying out their estimations. As a result of the application of ultrasonic technology in the feedwater of reactor BWR-5 in Laguna Verde, in the Unit 1 cycle 13 it was recover an equivalent energy to a thermal power of 25 MWt in the reactor and an exit electrical power of 6 M We in the turbogenerator. Also in the Unit 2 cycle 10 it was recover an equivalent energy to a thermal power of 40 MWt in the reactor and an exit electrical power of 16 M We in the turbogenerator. (Author)

  14. Application of a new methodology on the multicycle analysis for the Laguna Verde NPP en Mexico

    International Nuclear Information System (INIS)

    Cortes C, Carlos C.

    1997-01-01

    This paper describes the improvements done in the physical and economic methodologies on the multicycle analysis for the Boiling Water Reactors of the Laguna Verde NPP in Mexico, based on commercial codes and in-house developed computational tools. With these changes in our methodology, three feasible scenarios are generated for the operation of Laguna Verde Nuclear Power Plant Unit 2 at 12, 18 and 24 months. The physical economic results obtained are showed. Further, the effect of the replacement power is included in the economic evaluation. (author). 11 refs., 3 figs., 7 tabs

  15. Range of the radiation monitor for the rigid vent of primary containment during normal and emergency operation for a BWR-5 in Laguna Verde; Rango del monitor de radiacion para el venteo rigido de la contencion primaria durante operacion normal y emergencia para un reactor BWR-5 en Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F.; Pozos S, A. M.; Cabrera U, S.; Mata A, J. A.; Sandoval V, S.; Ovando C, R.; Vargas A, A.; Gallardo R, I.; Cruz G, M.; Amador C, C., E-mail: francisco.tijerina@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Km 44.5 Carretera Cardel-Nautla, 91476 Laguna Verde, Alto Lucero, Veracruz (Mexico)

    2014-10-15

    The earthquake followed by a tsunami, happened in March, 2011 in the coasts of oriental Japan, caused damages in the nuclear power plants 1 at 4 of Fukushima Daiichi leading to damage of the fuel in three of the reactors and to the radiation liberation to the exterior. As consequence of those events, the regulations requires that the power plants with Primary Containment type Mark I and II evaluate to have a system of rigid vent with a monitoring equipment of radiation effluents. The present work covers the rigid vent of diameter 12 of the Primary Containment, type Mark-II, of nuclear power plant of Laguna Verde in conditions of severe accident and normal operation, low regime of Extended Power Up rate (EPU - 2317 MWt), using the codes MAAP3B, MICROSHILED 5.05 and the Bardach Black Boxes methodology. As a result the measurement range of the radiation monitor that is required for monitoring the gassy liberation to the atmosphere was determined. The conclusion is that the superior limit of the range of the radiation meter during a Severe Accident is of 8.55 E + 05 R/h (8.55 E + 08 m R/h) and the superior limit in normal operation of 1.412 E-11 at 2.540 E-7 R/h (1.412 E-14 at 2.540 E-10 m R/h). (Author)

  16. Evaluation of the integrity and duration of the Laguna Verde nuclear power plant life- Plant Life Management program (PLIM). TC MEX 04/53 Technical Cooperation Project

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Diaz S, A.; Aguilar T, J.A.

    2006-01-01

    As part of the IAEA TC MEX 04/53 Project 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Handling Program of plant' whose objective is the one of beginning the actions to apply the methodology of Handling of plant life in the Unit 1 of the Laguna Verde Nucleo electric Central for to obtain the Renovation of License in 2020 the ININ, through the Department of Synthesis and Characterization of materials has carried out more of 20 analysis of susceptibility to the intergranular cracking for corrosion under effort in interns so much of the reactor of the unit 1 like of the unit 2 documenting the current state of components based on the type or types of materials that conform them, to it thermomechanical history, operational and of production, as well as of the particularities associated to its use and operation. For the application of the methodology of life handling of plant 5 structure systems or pilot components were selected, to carry out the programs of handling of the aging and handling of plant life: The encircling of the reactor core (Core Shroud), the reactor pressure vessel (Reactor Pressure Vessel), the primary container (Primary Containment), the recirculation system of feeding water (Reactor Feed Water) and cables. (Author)

  17. Development of Reactor Vessel Bottom Mount Instrumentation Nozzle Routine Inspection Device

    Energy Technology Data Exchange (ETDEWEB)

    Khaled, Atya Ahmed Abdallah; Ihn, Namgung [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    The primary coolant water of pressurized water reactors has created cracks in j-weld of penetrations with Alloy 600 through a process called primary water stress corrosion cracking. On October 6, 2013, BMI nozzle number 3 at Palo Verde Unit 3 (PVNGS-3) exhibited small white de-posits around the annulus. Nozzle attachment to the RV lower head is by J-groove weld to the inside penetration of the nozzle and the weld material is of Alloy 600 material. Above two cases clearly show the necessity of routine inspection of RV lower head penetration during refueling outage. Nondestructive inspection is generally performed to detect fine cracks or defects that may develop during operation. Defects usually occur at weld regions, hence most non-destructive inspection is to scan and check any defects or crack in the weld region. BMI nozzles at the bottom head of a nuclear reactor vessel (RV) are one of such area for inspection. But BMI nozzles have not been inspected during regular refuel outage due to the relative small size of BMI nozzle and limited impact of the consequences of BMI leak. However, there is growing concern since there have been leaks at nuclear power plants (NPPs) as well as recent operating experience. In this study, we propose a system that is conveniently used for nondestructive inspection of BMI nozzles during regular refueling outage without removing all the reactor internals. A 3D model of the inspection system was also developed along with the RV and internals which permits a virtual 3D simulation to check the design concept and usability of the system.

  18. Analysis of the stability of events occurred in Laguna Verde; Analisis de estabilidad de eventos ocurridos en Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Castillo D, R.; Ortiz V, J. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico); Calleros M, G. [CFE, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2005-07-01

    The new fuel designs for operation cycles more long have regions of uncertainty bigger that those of the old fuels, and therefore, they can have oscillations of power when an event is presented that causes that the reactor operates to high power and low flow of coolant. During the start up of the reactor there are continued procedures that avoid that oscillations are presented with that which makes sure the stable behavior of the reactor. However, when the reactor is operating to nominal conditions and they are shot or they are transferred to low speed the recirculation pumps, it cannot make sure that the reactor doesn't present oscillations of power when entering to the restricted operation regions. The methods of stability analysis commonly use signs of neutronic noise that require to be stationary, but after a transitory one where they commonly get lost the recirculation pumps the signs they don't have the required characteristics, for what they are used with certain level of uncertainty by the limited validity of the models. In this work the Prony method is used to determine the reactor stability, starting from signs of transitory and it is compared with autoregressive models. Four events are analyzed happened in the Laguna Verde power plant where the reactor was in the area of high power and low flow of coolant, giving satisfactory results. (Author)

  19. Impact of Sahara dust transport on Cape Verde atmospheric element particles.

    Science.gov (United States)

    Almeida-Silva, M; Almeida, S M; Freitas, M C; Pio, C A; Nunes, T; Cardoso, J

    2013-01-01

    The objectives of this study were to (1) conduct an elemental characterization of airborne particles sampled in Cape Verde and (2) assess the influence of Sahara desert on local suspended particles. Particulate matter (PM(10)) was collected in Praia city (14°94'N; 23°49'W) with a low-volume sampler in order to characterize its chemical composition by k0-INAA. The filter samples were first weighed and subsequently irradiated at the Portuguese Research Reactor. Results showed that PM(10) concentrations in Cape Verde markedly exceeded the health-based air quality standards defined by the European Union (EU), World Health Organization (WHO), and U.S. Environmental Protection Agency (EPA), in part due to the influence of Sahara dust transport. The PM(10) composition was characterized essentially by high concentrations of elements originating from the soil (K, Sm, Co, Fe, Sc, Rb, Cr, Ce, and Ba) and sea (Na), and low concentrations of anthropogenic elements (As, Zn, and Sb). In addition, the high concentrations of PM measured in Cape Verde suggest that health of the population may be less affected compared with other sites where PM(10) concentrations are lower but more enriched with toxic elements.

  20. Econometric models of power prices. An approach to market monitoring in the Western US

    International Nuclear Information System (INIS)

    Barmack, Matthew; Kahn, Edward; Tierney, Susan; Goldman, Charles

    2008-01-01

    Given the limitations of data and resources available for market monitoring in electricity markets where regional transmission organizations (RTO) do not exist, we argue that econometric models of power prices could provide a useful screening tool for market monitoring. To explore its feasibility, we developed several econometric models of power prices at two major trading hubs in the West: Palo Verde and Mid-Columbia. We show that our models explain a large portion of the variation in power prices in Palo Verde and can establish a benchmark that can be used to identify outlier prices that are potentially the result of anti-competitive behavior. (author)

  1. Financially troubled El Paso discontinues more nonutility operations

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    As part of a plan to phase out its nonutility businesses, El Paso Electric Company will discontinue its remaining PascoTex Corporation operations, consisting of the manufacture of specialty steel products, and company management released revised estimates of losses to be incurred during the disposal period. Recently El Paso announced it would also bow out of most of its nonutility real estate operations. Increased operating expenses, principally at El Paso's Palo Verde station nuclear facility, have also impacted the bottom line. All three units at Palo Verde were out of service at the time of this writing. The good news was that energy sales have increased

  2. Evaluation of the integrity and duration of the Laguna Verde nuclear power plant life- Plant Life Management program (PLIM). TC MEX 04/53 Technical Cooperation Project; Evaluacion de la integridad y extension de vida de la planta de potencia nuclear Laguna Verde- Programa de manejo de vida de planta (PLIM). Proyecto de cooperacion tecnica TC MEX 04/53

    Energy Technology Data Exchange (ETDEWEB)

    Arganis J, C.R.; Diaz S, A.; Aguilar T, J.A. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2006-07-01

    As part of the IAEA TC MEX 04/53 Project 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Handling Program of plant' whose objective is the one of beginning the actions to apply the methodology of Handling of plant life in the Unit 1 of the Laguna Verde Nucleo electric Central for to obtain the Renovation of License in 2020 the ININ, through the Department of Synthesis and Characterization of materials has carried out more of 20 analysis of susceptibility to the intergranular cracking for corrosion under effort in interns so much of the reactor of the unit 1 like of the unit 2 documenting the current state of components based on the type or types of materials that conform them, to it thermomechanical history, operational and of production, as well as of the particularities associated to its use and operation. For the application of the methodology of life handling of plant 5 structure systems or pilot components were selected, to carry out the programs of handling of the aging and handling of plant life: The encircling of the reactor core (Core Shroud), the reactor pressure vessel (Reactor Pressure Vessel), the primary container (Primary Containment), the recirculation system of feeding water (Reactor Feed Water) and cables. (Author)

  3. Cabo Verde - Private Sector Development

    Data.gov (United States)

    Millennium Challenge Corporation — The objective of the Private Sector Development Project activities of the 2005-2010 Cabo Verde Compact was to support Cabo Verde's long-term economic transformation...

  4. Early alert system for oscillations detection applied to the Central of Laguna Verde

    International Nuclear Information System (INIS)

    Calleros M, G.; Zapata Y, M.; Avila N, A.; Herrera H, S. F.

    2011-11-01

    The code Early Alert System developed by Engineering of the Reactor of the nuclear power plant of Laguna Verde is presented, showing its reliability like preventive and corrective instrument to external interferences to the reactor core, due to equipment malfunction associated to the typical systems of a nuclear power plant, as those that control the reactor pressure, those that feed water to the reactor, those that control the valves of the main turbine. With this purpose, real cases of application of the System are shown where the results are compared with the independent evaluations carried out by the supplier, observing compatibility in both results. The benefits of the logarithm are discussed in the nuclear industry as soon as in non nuclear ambits. (Author)

  5. Timo Palo jäine väljakutse

    Index Scriptorium Estoniae

    2014-01-01

    Fotonäitusest "Jäine väljakutse". Näitus koosneb kahest osast: National Geographicu fotograafi Paul Nickleni fotodest "Polar Obsession" ja Eesti polaarränduri Timo Palo retke põhjapooluselt Teravmägede saarestikku kirjeldavast väljapanekust

  6. Identification of sites within the Palo Duro Basin. Volume 3. Responses to comments

    International Nuclear Information System (INIS)

    1984-11-01

    This document responds to comments received by the US Department of Energy (DOE) on the draft report entitled Identification of Sites Within the Palo Duro Basin: Volume I - Palo Duro Location A (in Deaf Smith County) and Volume II - Palo Duro Location B (in Swisher County), BMI/ONWI-531, February 1984. The purpose of the report was to review existing geologic, environmental, and socioeconomic data for previously identified potentially acceptable sites consisting of approximately 200 square miles in Swisher County and 400 square miles in Deaf Smith County in the Texas Panhandle and to narrow them to preferred smaller sites for possible further study for a nuclear waste repository. The smaller sites thus identified within the two counties would then be more comparable in size to those in salt deposits in Louisiana, Mississippi, and Utah

  7. Advanced Light Water Reactor Plants System 80+trademark Design Certification Program

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this report is to provide a status of the progress that was made towards Design Certification of System 80+trademark during the US government's 1993 fiscal year. The System 80+ Advanced Light Water Reactor (ALWR) is a 3931 MW t (1350 MWe) Pressurized Water Reactor (PWR). The design consists of an essentially complete plant. It is based on evolutionary improvements to the Standardized System 80 nuclear steam supply system in operation at Palo Verde Units 1, 2, and 3, and the Duke Power Company P-81 balance-of-plant (BOP) that was designed and partially constructed at the Cherokee plant site. The System 80/P-81 original design has been substantially enhanced to increase conformance with the EPRI ALWR Utility Requirements Document (URD). Some design enhancements incorporated in the System 80+ design are included in the four units currently under construction in the Republic of Korea. These units form the basis of the Korean standardization program. The full System 80+ standard design has been offered to the Republic of China, in response to their recent bid specification. The ABB-CE Standard Safety Analysis Report (CESSAR-DC) was submitted to the NRC and a Draft Safety Evaluation Report was issued by the NRC in October 1992. CESSAR-DC contains the technical basis for compliance with the EPRI URD for simplified emergency planning. The Nuclear Steam Supply System (NSSS) is the standard ABB-Combustion Engineering two-loop arrangement with two steam generators, two hot legs and four cold legs each with a reactor coolant pump. The System 80+ standard plant includes a sperical steel containment vessel which is enclosed in a concrete shield building, thus providing the safety advantages of a dual containment

  8. Laguna Verde simulator: A new TRAC-RT based application

    International Nuclear Information System (INIS)

    Munoz Cases, J.J.; Tanarro Onrubia, A.

    2006-01-01

    In a partnership with GSE Systems, TECNATOM is developing a full scope training simulator for Laguna Verde Unit 2 (LV2). The simulator design is based upon the current 'state-of-the art technology' regarding the simulation platform, instructor station, visualization tools, advanced thermalhydraulics and neutronics models, I/O systems and automated model building technology. When completed, LV2 simulator will achieve a remarkable level of modeling fidelity by using TECNATOM's TRAC-RT advanced thermalhydraulic code for the reactor coolant and main steam systems, and NEMO neutronic model for the reactor core calculations. These models have been utilized up to date for the development or upgrading of nine NPP simulators in Spain and abroad, with more than 8000 hours of training sessions, and have developed an excellent reputation for its robustness and high fidelity. (author)

  9. Santeria and Palo Mayombe: skulls, mercury, and artifacts.

    Science.gov (United States)

    Gill, James R; Rainwater, Christopher W; Adams, Bradley J

    2009-11-01

    Santeria and Palo Mayombe are syncretic religions created in the New World based upon African religious beliefs combined with Christianity. The main worship of Palo Mayombe involves religious receptacles that may contain earth, sticks, varied artifacts, and animal and human remains. Due to the use of human and nonhuman remains, discovery of these items often leads to involvement by the police due to a concern of homicide. We review in detail the medical examiner records of two of these ritualistic cases including the autopsy, anthropology, police, and investigators' reports. For the human remains, careful consideration of the context in which the remains were recovered, their state of preservation, and the associated artifacts (e.g., beads and mercury) are important in determining the appropriate level of forensic significance. Anthropological examination with particular attention to taphonomic characteristics also may help determine the origin and forensic significance.

  10. Analysis of the three dimensional core kinetics NESTLE code coupling with the advanced thermo-hydraulic code systems, RELAP5/SCDAPSIM and its application to the Laguna Verde Central reactor; Analisis para el acoplamiento del codigo NESTLE para la cinetica tridimensional del nucleo al codigo avanzado de sistemas termo-hidraulicos, RELAP5/SCDAPSIM y su aplicacion al reactor de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Salazar C, J H; Nunez C, A [CNSNS, Dr. Jose Ma. Barragan No. 779, Col. Narvarte, 03020 Mexico D.F. (Mexico); Chavez M, C [UNAM, Facultad de Ingenieria, DEPFI Campus Morelos (Mexico)

    2004-07-01

    The objective of the written present is to propose a methodology for the joining of the codes RELAP5/SCDAPSIM and NESTLE. The development of this joining will be carried out inside a doctoral program of Engineering in Energy with nuclear profile of the Ability of Engineering of the UNAM together with the National Commission of Nuclear Security and Safeguards (CNSNS). The general purpose of this type of developments, is to have tools that are implemented by multiple programs or codes such a that systems or models of the three-dimensional kinetics of the core can be simulated and those of the dynamics of the reactor (water heater-hydraulics). In the past, by limitations for the calculation of the complete answer of both systems, the developed models they were carried out for separate, putting a lot of emphasis in one but neglecting the other one. These methodologies, calls of better estimate, will be good to the nuclear industry to evaluate, with more high grades of detail, the designs of the nuclear power plant (for modifications to those already existent or for new concepts in the designs of advanced reactors), besides analysing events (transitory and have an accident), among other applications. The coupled system was applied to design studies and investigation of the Laguna Verde Nuclear power plant (CNLV). (Author)

  11. Proposal for implementation of alternative source term in the nuclear power plant of Laguna Verde; Propuesta de implementacion del termino fuente alternativo en la central nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Bazan L, A.; Lopez L, M.; Vargas A, A.; Cardenas J, J. B. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km. 7.5 Carretera Veracruz-Medellin, Dos Bocas, Veracruz (Mexico)], e-mail: ariadna.bazan@cfe.gob.mx

    2009-10-15

    In 2010 the nuclear power plant of Laguna Verde will implement the extended power upbeat in both units of the plant. Agree with methodology of NEDC-33004P-A, (constant pressure power up rate), and the source term of core, for accidents evaluations, were increased in proportion to the ratio of power level. This means that for the case of a design basis accident of loss of coolant an increase of power of 15% originated an increase of 15% in dose to main control room. Using the method of NEDC-33004P-A to extended power upbeat conditions was determined that the dose value to main control room is very near to regulatory limit established by SRP 6.4. By the above and in order to recover the margin, the nuclear power plant of Laguna Verde will calculate an alternative source term following the criteria established in RG 1.183 (alternative radiological source term for evaluating DBA at nuclear power reactor). This approach also have a more realistic dose value using the criterion of 10-CFR-50.67, in addition is predicted to get the benefit of additional operational flexibilities. This paper present the proposal of implementing the alternative source term in Laguna Verde. (Author)

  12. Root cause of failure analysis and the system engineer

    International Nuclear Information System (INIS)

    Coppock, M.S.; Hartwig, A.W.

    1990-01-01

    In an industry where ever-increasing emphasis is being placed on root cause of failure determination, it is imperative that a successful nuclear utility have an effective means of identifying failures and performing the necessary analyses. The current Institute of Nuclear Power Operations (INPO) good practice, OE-907, root-cause analysis, gives references to methodology that will help determine breakdowns in procedures, programs, or design but gives very little guidance on how or when to perform component root cause of failure analyses. The system engineers of nuclear utilities are considered the focal point for their respective systems and are required by most programs to investigate component failures. The problem that the system engineer faces in determining a component root cause of failures lies in acquisition of the necessary data to identify the need to perform the analysis and in having the techniques and equipment available to perform it. The system engineers at the Palo Verde nuclear generating station routinely perform detailed component root cause of failure analyses. The Palo Verde program provides the system engineers with the information necessary to identify when a component root cause of failure is required. Palo Verde also has the necessary equipment on-site to perform the analyses

  13. Changes in composition and structure of a tropical dry forest following intermittent Cattle grazing

    Directory of Open Access Journals (Sweden)

    Margaret Stern

    2002-12-01

    Full Text Available In northwestern Costa Rica, cattle are being used as a "management tool" to reduce the amount of combustible material, mainly dominated by Hyparrhenia rufa, an African grass. This project is being developed within Parque Nacional Palo Verde and Reserva Biológica Lomas Barbudal, both of which fonn part of the only remaining tropical dry forests in Mesoamerica. To determine the short-term effects of cattle grazing on the natural vegetation, we compared the floristic composition within Palo Verde in an area under intermittent cattle grazing with an area that has not been grazed. There were significantly fewer plant species in the area with intermittent cattle grazing compared to the area with no grazing. Floristic composition of these two habitats was different as reflected by both Fisher's alpha values and the Shannon index of diversity, both of which were significantly higher in the ungrazed site. The ungrazed area contained more plant species and was more similar to mature forest. The structure of the vegetation was significantly different between the intermittently grazed and ungrazed sites with more small stems (1-5 cm dbh and fewer large stems (>5 cm dbh in the intermittently grazed habitat. These results indicate that cattle grazing has an impact on the dry forest by reducing the relative abundance and density of larger tree species and by changing the species composition and structure of the community. The current management plan implemented in Palo Verde and Lomas Barbudal is not appropriate because of the impact that cattle have on the structure of the natural vegetation and should not be considered a viable alternative in other protected areas of dry forest in the Neotropics. We suggest that alternative fire prevention measures be evaluated including hand-cutting H. rufa, the creation of more frequent and larger fire breaks, and the development of green breaks.En el noroeste de Costa Rica se utiliza ganado como una "herramienta de

  14. Introduction of fuel GE14 in the nuclear power plant of Laguna Verde for the extended increase of power; Introduccion del combustible GE14 en la central nuclear Laguna Verde para el aumento de potencia extendido

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez M, N.; Vargas A, A. F.; Cardenas J, J. B.; Contreras C, P. [CFE, Central Nuclear Laguna Verde, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km. 7.5 (Mexico)]. e-mail: natividad.hernandez@cfe.gob.mx

    2008-07-01

    The project of extended increase of power responds to a necessity of electrical energy in the country, increasing the thermal exit of the reactors of the nuclear power plant of Laguna Verde of 2027 MWt to 2317 MWt. In order to support this transition, changes will make in the configuration of the reactor core and in the operation strategies of the cycle, also they will take initiatives to optimize the economy in fuel cycle. At present in both reactors of the nuclear plant of Laguna Verde fuel GE12 is used. The fuel GE14 presents displays with respect to the GE12, some improvements in the mechanical design and consequently in its performance generally. Between these improvements we can mention: 1. Spacers of high performance. 2. Shielding with barrier. 3. Filter for sweepings {sup d}ebris{sup a}nd 4. Fuel rods of minor partial length. The management of nuclear power plants has decided to introduce the use of fuel GE14 in Laguna Verde in the reload 14 for Unit 1 and of the reload 10 for Unit 2. The process of new introduction fuel GE14 consists of two stages, first consists on subjecting the one new design of fuel to the regulator organism in the USA: Nuclear Regulatory Commission, in Mexico the design must be analyzed and authorized by the National Commission of Nuclear Safety and Safeguards, for its approval of generic form, by means of the demonstration of the fulfillment with the amendment 22 of GESTAR II, the second stage includes the specific analyses of plant to justify the use of the new fuel design in a reload core. The nuclear plant of Laguna Verde would use some of the results of the security analyses that have been realized for the project of extended increase of power with fuel GE14, to document the specific analyses of plant with the new fuel design. The result of the analyses indicates that the reload lots are increased of 116-120 assemblies in present conditions (2027 MWt) to 140-148 assemblies in conditions of extended increase of power (2317 MWt

  15. Experiences with the technical cooperation project TC MEX 04/53. Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant. Management program of the plant life (PLIM); Experiencias con el proyecto de cooperacion tecnica TC MEX 04/53. Evaluacion de la integridad y extension de vida de la planta de potencia nuclear Laguna Verde. Programa de Manejo de vida de planta (PLIM)

    Energy Technology Data Exchange (ETDEWEB)

    Arganis J, C.R.; Aguilar T, J.A. [ININ, 52750 Ocoyoacac, Estado de Mexico (Mexico); Guevara M, A.; Garcia M, C.; Martinez G, R.R.; Griz C, M.M.; Sanchez M, M.A.; Diaz O, R.C. [CFE, Subgerencia de Ingenieria, Carretera Veracruz-Medellin, Km. 7.5 Veracruz (Mexico)]. e-mail: craj@nuclear.inin.mx

    2006-07-01

    In the biennium 2005-2006 the project of technical cooperation with the International Atomic Energy Agency OIEA TC MEX 04/53 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Plant life handling program (PLIM)' was approved, which has as objective the one to begin the actions to apply the methodology of Handling of life of Plant (PLIM) in the Unit I (Ul) of the Laguna Verde Nucleo electric Central (CNLV), in order to obtain the Renovation of License (LR), in a long term (2020). To apply this methodology 5 systems they were selected, structures or components (SEC) to carry out the handling programs of the one aging (AMP), and PLIM which are: The encircling of the reactor core (Core Shroud), the pressure vessel of the reactor (Reactor Pressure Vessel), the one primary container (Primary Containment), the system of feeding water (Reactor Feed Water) and cables, which were not in this work to be of another nature. The report presents the more important aspects considered in these systems for their programs of AMP and PLIM, as like a revision of those selection processes and evaluation (screening and scoping) for the application of PLIM in the systems of the Ul of the CNLV. (Author)

  16. 75 FR 70673 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-18

    ..., Fairview, NJ 07650, Officers: Yoon H. Cho, Vice President/Secretary (Qualifying Individual), Young S. Cho...., Rancho Palos Verdes, CA 90275, Officers: Stephen M. Kiang, President (Qualifying Individual), Benjamin L...

  17. HLA polymorphisms in Cabo Verde and Guiné-Bissau inferred from sequence-based typing.

    Science.gov (United States)

    Spínola, Hélder; Bruges-Armas, Jácome; Middleton, Derek; Brehm, António

    2005-10-01

    Human leukocyte antigen (HLA)-A, -B, and -DRB1 polymorphisms were examined in the Cabo Verde and Guiné-Bissau populations. The data were obtained at high-resolution level, using sequence-based typing. The most frequent alleles in each locus was: A*020101 (16.7% in Guiné-Bissau and 13.5% in Cabo Verde), B*350101 (14.4% in Guiné-Bissau and 13.2% in Cabo Verde), DRB1*1304 (19.6% in Guiné-Bissau), and DRB1*1101 (10.1% in Cabo Verde). The predominant three loci haplotype in Guiné-Bissau was A*2301-B*1503-DRB1*1101 (4.6%) and in Cabo Verde was A*3002-B*350101-DRB1*1001 (2.8%), exclusive to northwestern islands (5.6%) and absent in Guiné-Bissau. The present study corroborates historic sources and other genetic studies that say Cabo Verde were populated not only by Africans but also by Europeans. Haplotypes and dendrogram analysis shows a Caucasian genetic influence in today's gene pool of Cabo Verdeans. Haplotypes and allele frequencies present a differential distribution between southeastern and northwestern Cabo Verde islands, which could be the result of different genetic influences, founder effect, or bottlenecks. Dendrograms and principal coordinates analysis show that Guineans are more similar to North Africans than other HLA-studied sub-Saharans, probably from ancient and recent genetic contacts with other peoples, namely East Africans.

  18. Bats of Mesa Verde National Park, Colorado: composition, reproduction, and roosting habits.

    Science.gov (United States)

    O'Shea, Thomas J.; Cryan, Paul M.; Snider, E. Apple; Valdez, Ernest W.; Ellison, Laura E.; Neubaum, Daniel J.

    2011-01-01

    We determined the bat fauna at Mesa Verde National Park (Mesa Verde) in 2006 and 2007, characterized bat elevational distribution and reproduction, and investigated roosting habits of selected species. We captured 1996 bats of 15 species in mist nets set over water during 120 nights of sampling and recorded echolocation calls of an additional species. The bat fauna at Mesa Verde included every species of bat known west of the Great Plains in Colorado, except the little brown bat (Myotis lucifugus). Some species showed skewed sex ratios, primarily due to a preponderance of males. Thirteen species of bats reproduced at Mesa Verde. Major differences in spring precipitation between the 2 years of our study were associated with differences in reproductive rates and, in some species, with numbers of juveniles captured. Reduced reproductive effort during spring drought will have a greater impact on bat populations with the forecasted increase in aridity in much of western North America by models of global climate change. We radiotracked 46 bats of 5 species to roosts and describe the first-known maternity colonies of spotted bats (Euderma maculatum) in Colorado. All 5 species that we tracked to diurnal roosts relied almost exclusively on rock crevices rather than trees or snags, despite the presence of mature forests at Mesa Verde and the use of trees for roosts in similar forests elsewhere by some of these species. Comparisons with past bat surveys at Mesa Verde and in surrounding areas suggest no dramatic evidence for effects of recent stand-replacing fires on the composition of the bat community.

  19. U russkoi molodjozhi jest shans / Urve Palo ; interv. Ilja Gromov

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2008-01-01

    Rahvastikuminister Urve Palo selgitab Avatud Ühiskonna Instituudi vene keelt kõnelevate noorte seas läbi viidud uuringu tulemusi. Lisa: Küsitlus: Kas vene keelt kõnelevatel noortel on Eestis hea elada

  20. Analysis of the stability of events occurred in Laguna Verde

    International Nuclear Information System (INIS)

    Castillo D, R.; Ortiz V, J.; Calleros M, G.

    2005-01-01

    The new fuel designs for operation cycles more long have regions of uncertainty bigger that those of the old fuels, and therefore, they can have oscillations of power when an event is presented that causes that the reactor operates to high power and low flow of coolant. During the start up of the reactor there are continued procedures that avoid that oscillations are presented with that which makes sure the stable behavior of the reactor. However, when the reactor is operating to nominal conditions and they are shot or they are transferred to low speed the recirculation pumps, it cannot make sure that the reactor doesn't present oscillations of power when entering to the restricted operation regions. The methods of stability analysis commonly use signs of neutronic noise that require to be stationary, but after a transitory one where they commonly get lost the recirculation pumps the signs they don't have the required characteristics, for what they are used with certain level of uncertainty by the limited validity of the models. In this work the Prony method is used to determine the reactor stability, starting from signs of transitory and it is compared with autoregressive models. Four events are analyzed happened in the Laguna Verde power plant where the reactor was in the area of high power and low flow of coolant, giving satisfactory results. (Author)

  1. Experiences with the technical cooperation project TC MEX 04/53. Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant. Management program of the plant life (PLIM)

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Aguilar T, J.A.; Guevara M, A.; Garcia M, C.; Martinez G, R.R.; Griz C, M.M.; Sanchez M, M.A.; Diaz O, R.C.

    2006-01-01

    In the biennium 2005-2006 the project of technical cooperation with the International Atomic Energy Agency OIEA TC MEX 04/53 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Plant life handling program (PLIM)' was approved, which has as objective the one to begin the actions to apply the methodology of Handling of life of Plant (PLIM) in the Unit I (Ul) of the Laguna Verde Nucleo electric Central (CNLV), in order to obtain the Renovation of License (LR), in a long term (2020). To apply this methodology 5 systems they were selected, structures or components (SEC) to carry out the handling programs of the one aging (AMP), and PLIM which are: The encircling of the reactor core (Core Shroud), the pressure vessel of the reactor (Reactor Pressure Vessel), the one primary container (Primary Containment), the system of feeding water (Reactor Feed Water) and cables, which were not in this work to be of another nature. The report presents the more important aspects considered in these systems for their programs of AMP and PLIM, as like a revision of those selection processes and evaluation (screening and scoping) for the application of PLIM in the systems of the Ul of the CNLV. (Author)

  2. Technical and economic proposal for the extension of the Laguna Verde Nuclear Power plant with an additional nuclear reactor

    International Nuclear Information System (INIS)

    Leal C, C.D.; Francois L, J.L.

    2006-01-01

    The increment of the human activities in the industrial environments and of generation of electric power, through it burns it of fossil fuels, has brought as consequence an increase in the atmospheric concentrations of the calls greenhouse effect gases and, these in turn, serious repercussions about the environment and the quality of the alive beings life. The recent concern for the environment has provoked that industrialized countries and not industrialized carry out international agreements to mitigate the emission from these gases to the atmosphere. Our country, like part of the international community, not is exempt of this problem for what is necessary that programs begin guided toward the preservation of the environment. As for the electric power generation, it is indispensable to diversify the sources of primary energy; first, to knock down the dependence of the hydrocarbons and, second, to reduce the emission of polluting gases to the atmosphere. In this item, the nucleo electric energy not only has proven to be safe and competitive technical and economically, able to generate big quantities of electric power with a high plant factor and a considerable cost, but rather also, it is one of the energy sources that less pollutants it emits to the atmosphere. The main object of this work is to carry out a technical and economic proposal of the extension of the Laguna Verde Nuclear power plant (CNLV) with a new nuclear reactor of type A BWR (Advanced Boiling Water Reactor), evolutionary design of the BWR technology to which belong the two reactors installed at the moment in the plant, with the purpose of increasing the installed capacity of generation of the CNLV and of the Federal Commission of Electricity (CFE) with foundation in the sustainable development and guaranteeing the protection of the environment by means of the exploitation of a clean and sure technology that counts at the moment with around 12,000 year-reactor of operational experience in more of

  3. Reproduction of the flow-power map of the Laguna Verde power plant; Reproduccion del mapa flujo-potencia de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Amador G, R; Gonzalez M, V M [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    The National Commission of Nuclear Safety and Safeguards (CNSNS) requires to have calculation tools which allows it to make analysis independent of the behavior of the reactor core of Laguna Verde nuclear power plant (CNLV) with the purpose to support the evaluation and discharge activities of the fuel recharges licensing. The software package Fms (Fuel Management System) allows to carry out an analysis of the core of the BWR type reactors along the operation cycle to detect possible anomalies and/or helping in the fuel management. In this work it is reproduced the flow-power for the CNLV using the Presto code of the Fms software package. The comparison of results with the map used by the operators of CNLV shows good agreement between them. Another exercise carried out was the changes study that the axial and radial power outlines undergo as well as the thermohydraulic parameters (LHGR, APLHGR, CPR) when moving a control rod. The obtained results show that is had the experience to effect analysis of the reactor behavior using the Presto-Fms code therefore the study of the rest of the software package for the obtention of nuclear parameters used in this code is recommended. (Author)

  4. Toetame lasteaedu ja lasteaia õpetajaid / Urve Palo

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2007-01-01

    Ilmunud ka: Põhjarannik, 7. sept. 2007, lk. 2; Severnoje Poberezhje, 7. sept. 2007, lk. 2; Meie Maa, 7. sept. 2007, lk. 2; Kuulutaja, 7. sept. 2007, lk. 4; Koit, 8. sept. 2007, lk. 5; Võrumaa Teataja, 8. sept. 2007, lk. 2; Vooremaa, 8. sept. 2007, lk. 2; Sakala, 11. sept. 2007, lk. 2; Nädaline, 11. sept. 2007, lk. 2; Pärnu Postimees, 12. sept. 2007, lk. 15; Valgamaalane, 13. sept. 2007, lk. 2; Hiiu Leht, 18. sept. 2007, lk. 2; Sõnumitooja, 19. sept. 2007, lk. 2; Maaleht, 20. sept. 2007, lk. 8; Nädalaleht, 7. sept. 2007, lk. 2. Rahvastikuminister Urve Palo kinnitusel eraldab uus valitsus rohkem kui kunagi varem raha uute lasteaedade ehituseks ja vanade renoveerimiseks, oluliseks sammuks on lasteaiaõpetajate palga tõstmine, tähelepanu all on piirkondlike erinevuste vähendamine palgatasemetes ning lasteaiaõpetajate palga viimine põhikooliõpetajate alampalga tasemele

  5. Area geological characterization report for the Palo Duro and Dalhart Basins, Texas

    International Nuclear Information System (INIS)

    1983-07-01

    The present state of knowledge of the geology, hydrogeology, and seismology of the Palo Duro and Dalhart basins is summarized as a basis for future siting studies for a high-level nuclear waste repository. Large portions of the Texas Panhandle, and especially the Palo Duro basin, have stable geologic conditions and a favorable evaporite stratigraphy that warrant further study. Five salt-bearing formations containing thick salt units are present within the basin. Salt beds appear to be persistent over wide areas, relatively flat lying and structurally undisturbed. Available hydrogeologic data suggest that favorable conditions for waste isolation are widespread. The level and rate of seismic activity are low throughout the Texas Panhandle. 335 references, 83 figures, 17 tables

  6. Complejo de restauración del atún rojo en Cabo de Palos : CRARCP

    OpenAIRE

    Denchev Torlakov, Ivaylo

    2016-01-01

    El proyecto pretende por una parte poner en valor el producto del atún rojo promocionando los nuevos valores de la cocina (I+D+I) y convertirlo en símbolo de identidad para el municipio de Cabo de Palos y la Región de Murcia. Por otra parte se busca la reactivación y definición de un borde urbano en Cabo de Palos. Para ello se definen los siguientes objetivos: - Analizar el entorno urbano existente, evaluarlo y proponer soluciones que permitan mejorar las condiciones del mismo, impulsando la ...

  7. Introduction of fuel GE14 in the nuclear power plant of Laguna Verde for the extended increase of power

    International Nuclear Information System (INIS)

    Hernandez M, N.; Vargas A, A. F.; Cardenas J, J. B.; Contreras C, P.

    2008-01-01

    The project of extended increase of power responds to a necessity of electrical energy in the country, increasing the thermal exit of the reactors of the nuclear power plant of Laguna Verde of 2027 MWt to 2317 MWt. In order to support this transition, changes will make in the configuration of the reactor core and in the operation strategies of the cycle, also they will take initiatives to optimize the economy in fuel cycle. At present in both reactors of the nuclear plant of Laguna Verde fuel GE12 is used. The fuel GE14 presents displays with respect to the GE12, some improvements in the mechanical design and consequently in its performance generally. Between these improvements we can mention: 1. Spacers of high performance. 2. Shielding with barrier. 3. Filter for sweepings d ebris a nd 4. Fuel rods of minor partial length. The management of nuclear power plants has decided to introduce the use of fuel GE14 in Laguna Verde in the reload 14 for Unit 1 and of the reload 10 for Unit 2. The process of new introduction fuel GE14 consists of two stages, first consists on subjecting the one new design of fuel to the regulator organism in the USA: Nuclear Regulatory Commission, in Mexico the design must be analyzed and authorized by the National Commission of Nuclear Safety and Safeguards, for its approval of generic form, by means of the demonstration of the fulfillment with the amendment 22 of GESTAR II, the second stage includes the specific analyses of plant to justify the use of the new fuel design in a reload core. The nuclear plant of Laguna Verde would use some of the results of the security analyses that have been realized for the project of extended increase of power with fuel GE14, to document the specific analyses of plant with the new fuel design. The result of the analyses indicates that the reload lots are increased of 116-120 assemblies in present conditions (2027 MWt) to 140-148 assemblies in conditions of extended increase of power (2317 MWt). (Author)

  8. Current situation of spent fuel management in the Laguna Verde Nuclear Power Plant, Veracruz, Mexico

    International Nuclear Information System (INIS)

    Moreno, C.V.

    1994-01-01

    The Comision Federal de Electricidad (CFE), owner and operator of the Laguna Verde nuclear power plant (2 x 654 MWe BWR), has twice decided to increase the storage capacity of the spent fuel pools of the reactors. The Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS), the national nuclear regulatory authority, approved the increase by a factor of 2.66 in the storage capacity proposal by CFE in 1989. Each reactor spent fuel pool can now hold 614 t HM. The reracking was done at a cost of about US $13 per kg U, which will add only 0.042 mills per kWh to the fuel cycle cost. (author)

  9. Severe Accident Simulation of the Laguna Verde Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Gilberto Espinosa-Paredes

    2012-01-01

    Full Text Available The loss-of-coolant accident (LOCA simulation in the boiling water reactor (BWR of Laguna Verde Nuclear Power Plant (LVNPP at 105% of rated power is analyzed in this work. The LVNPP model was developed using RELAP/SCDAPSIM code. The lack of cooling water after the LOCA gets to the LVNPP to melting of the core that exceeds the design basis of the nuclear power plant (NPP sufficiently to cause failure of structures, materials, and systems that are needed to ensure proper cooling of the reactor core by normal means. Faced with a severe accident, the first response is to maintain the reactor core cooling by any means available, but in order to carry out such an attempt is necessary to understand fully the progression of core damage, since such action has effects that may be decisive in accident progression. The simulation considers a LOCA in the recirculation loop of the reactor with and without cooling water injection. During the progression of core damage, we analyze the cooling water injection at different times and the results show that there are significant differences in the level of core damage and hydrogen production, among other variables analyzed such as maximum surface temperature, fission products released, and debris bed height.

  10. Proposal for implementation of alternative source term in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Bazan L, A.; Lopez L, M.; Vargas A, A.; Cardenas J, J. B.

    2009-10-01

    In 2010 the nuclear power plant of Laguna Verde will implement the extended power upbeat in both units of the plant. Agree with methodology of NEDC-33004P-A, (constant pressure power up rate), and the source term of core, for accidents evaluations, were increased in proportion to the ratio of power level. This means that for the case of a design basis accident of loss of coolant an increase of power of 15% originated an increase of 15% in dose to main control room. Using the method of NEDC-33004P-A to extended power upbeat conditions was determined that the dose value to main control room is very near to regulatory limit established by SRP 6.4. By the above and in order to recover the margin, the nuclear power plant of Laguna Verde will calculate an alternative source term following the criteria established in RG 1.183 (alternative radiological source term for evaluating DBA at nuclear power reactor). This approach also have a more realistic dose value using the criterion of 10-CFR-50.67, in addition is predicted to get the benefit of additional operational flexibilities. This paper present the proposal of implementing the alternative source term in Laguna Verde. (Author)

  11. MGS Esmeralda: new large seed mungbean cultivar MGS Esmeralda: nova cultivar de mungo-verde de sementes grandes

    Directory of Open Access Journals (Sweden)

    Rogério Faria Vieira

    2008-06-01

    Full Text Available Mungbean cultivar MGS Esmeralda was developed by Asian Vegetable Research and Development Center (Shanhua, Taiwan, as a result of crossing between the lines VC 1973A and VC 2768A. In ten trials conducted in the State of Minas Gerais, Brazil, it produced 13.5% more grains than 'Ouro Verde MG-2' (control cultivar, and its highest yield was 2,550 kg ha-1. The cultivar MGS Esmeralda is more susceptible to lodging, and its pods mature more uniformly than Ouro Verde MG-2 pods. One hundred-seed mass of 'MGS Esmeralda' ranged between 5.5 and 6.8 g. Both cultivars are susceptible to powdery mildew and cercospora leaf spot.A cultivar de mungo-verde MGS Esmeralda foi criada pelo Asian Vegetable Research and Development Center, localizado em Shanhua, Formosa. Ela é resultado do cruzamento entre as linhagens VC 1973A e VC 2768A. Em dez ensaios conduzidos em Minas Gerais, ela produziu 13,5% mais grãos do que a cultivar Ouro Verde MG-2 (testemunha, e sua produtividade mais alta foi 2.550 kg ha-1. A cultivar MGS Esmeralda é mais suscetível ao acamamento do que a Ouro Verde MG-2, mas suas vagens amadurecem mais uniformemente. A massa de 100 grãos da 'MGS Esmeralda' varia de 5,5 a 6,8 g. Ambas as cultivares são suscetíveis ao oídio e à cercosporiose.

  12. Radiological analysis by the addition of hydrogen and noble metals in the reactors of the Laguna Verde central

    International Nuclear Information System (INIS)

    Padilla C, I.

    2006-01-01

    and of the radiological behavior when applying them, its allowed to settle down strategies in the Laguna Verde Central to control and to reduce the magnitude of the radiological increment in the primary steam lines in both units during the initial period of application. The radiological effects by the addition of hydrogen and of the noble metals, and its incorporation sequence to the reactor are the one reason of this work. (Author)

  13. Neutron dosimetry. Environmental monitoring in a BWR type reactor; Dosimetria de neutrones. Monitoreo ambiental en un reactor del tipo BWR

    Energy Technology Data Exchange (ETDEWEB)

    Tavera D, L; Camacho L, M E

    1991-01-15

    The measurements carried out on reactor dosimetry are applied mainly to the study on the effects of the radiation in 108 materials of the reactor; little is on the environmental dosimetry outside of the primary container of BWR reactors. In this work the application of a neutron spectrometer formed by plastic detectors of nuclear traces manufactured in the ININ, for the environmental monitoring in penetrations around the primary container of the unit I of the Laguna Verde central is presented. The neutron monitoring carries out with purposes of radiological protection, during the operational tests of the reactor. (Author)

  14. Verde pentru biciclete (Green for Bycicles

    Directory of Open Access Journals (Sweden)

    Romina Faur

    2011-06-01

    Full Text Available The campaign “Verde pentru biciclete” (Engl. “Green for bicycles” is the first official initiative from Timişoara that encourages adopting cycling as an ecological and economical alternative to urban transportation; this addresses the citizens of Timişoara and not only, regardless of age. “Verde pentru biciclete” is a pedalling movement supported by the Bega Foundation, in collaboration with the Gratzu Sportive Club, KissFM, Ziua de Vest, Agenda and agenda.ro. The debut of the campaign took place of October 25th 2008, with the first “Verde pentru biciclete” event – “The bicycles Counting”. All the events that followed were held to draw attention on the importance of cycling, together with obtaining of certain facilities, necessary for the cyclists’ safe movement in traffic. Moreover, a number of communication platforms have been created between the fans of cycling; thus, the website www.pedaleaza.ro has been created, through which those interested can inform themselves or communicate on the forum and discussions group verde_pentru_biciclete@yahoogroups.com o through the social network Facebook (facebook.com/ verdepentrubiciclete. This paper presents the activities held within the campaign since its beginning until today, as well as our future plans.

  15. Applications of the monitor of loose parts in the cycle 6 of the Laguna Verde Unit 2 power plant; Aplicaciones del monitor de partes sueltas en el ciclo 6 de la Unidad 2 de la central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Calleros, G.; Mendez, A.; Gomez, R.A. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Veracruz (Mexico); Castillo, R.; Bravo, J.M. [ININ, A.P. 18-1027, 11801 Mexico D.F. (Mexico)]. E-mail: gcm9acpp@cfe.gob.mx

    2004-07-01

    The monitor of loose parts (Loose Parts Monitoring System) installed in the Unit 2 of the Laguna Verde Central is a tool to detect strange objects or parts loose in the system of refrigeration of the reactor that could be impacted in the walls of the recirculation knots or in the internal of the reactor. In this work two applications are shown carried out with the Monitor of Loose Parts, determining the characteristics of the stable nominal conditions, those which when changing, they are used to diagnose during the Cycle 6 of the Unit 2, failures in the components of the the recirculation circuits or to identify mechanical vibrations of the recirculation knots induced by a flow of recirculation bistable associated to operative conditions of the reactor. (Author)

  16. Geotechnical materials considerations for conceptual repository design in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Versluis, W.S.; Balderman, M.A.

    1984-01-01

    The Palo Duro Basin is only one of numerous potential repository locations for placement of a nuclear waste repository. Conceptual designs in the Palo Duro Basin involve considerations of the character and properties of the geologic materials found on several sites throughout the Basin. The first consideration presented includes current basin exploration results and interpretations of engineering properties for the basin geologic sequences. The next consideration presented includes identification of the characteristics of rock taken from the geologic sequence of interest through laboratory and field testing. Values for materials properties of representative samples are obtained for input into modeling of the material response to repository placement. Conceptual designs which respond to these geotechnical considerations are discussed. 4 references, 4 figures, 4 tables

  17. Groundwater quality in the Colorado River basins, California

    Science.gov (United States)

    Dawson, Barbara J. Milby; Belitz, Kenneth

    2012-01-01

    Groundwater provides more than 40 percent of California’s drinking water. To protect this vital resource, the State of California created the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The Priority Basin Project of the GAMA Program provides a comprehensive assessment of the State’s groundwater quality and increases public access to groundwater-quality information. Four groundwater basins along the Colorado River make up one of the study areas being evaluated. The Colorado River study area is approximately 884 square miles (2,290 square kilometers) and includes the Needles, Palo Verde Mesa, Palo Verde Valley, and Yuma groundwater basins (California Department of Water Resources, 2003). The Colorado River study area has an arid climate and is part of the Sonoran Desert. Average annual rainfall is about 3 inches (8 centimeters). Land use in the study area is approximately 47 percent (%) natural (mostly shrubland), 47% agricultural, and 6% urban. The primary crops are pasture and hay. The largest urban area is the city of Blythe (2010 population of 21,000). Groundwater in these basins is used for public and domestic water supply and for irrigation. The main water-bearing units are gravel, sand, silt, and clay deposited by the Colorado River or derived from surrounding mountains. The primary aquifers in the Colorado River study area are defined as those parts of the aquifers corresponding to the perforated intervals of wells listed in the California Department of Public Health database. Public-supply wells in the Colorado River basins are completed to depths between 230 and 460 feet (70 to 140 meters), consist of solid casing from the land surface to a depth of 130 of 390 feet (39 to 119 meters), and are screened or perforated below the solid casing. The main source of recharge to the groundwater systems in the Needles, Palo Verde Mesa, and Palo Verde Valley basins is the Colorado River; in the Yuma basin, the main source of recharge is from

  18. Identification of sites within the Palo Duro Basin. Volume 1. Palo Duro Location A

    International Nuclear Information System (INIS)

    1984-11-01

    This three-volume document narrows to two sites for continued investigations for potential nuclear waste repository sites in the Palo Duro Basin of the Texas Panhandle. Volume 1 narrows a site previously identified in Deaf Smith County, Texas; Volume 2 narrows a site previously identified in Swisher County, Texas; and Volume 3 contains responses to comments received regarding the drafts of Volumes 1 and 2 (BMI/ONWI-531). These volumes discuss the methodology and logic used as well as the results that narrowed these sites. Each of the 10 site performance criteria was divided into descriptors related to site performance characteristics. Each descriptor was evaluated by a systematic logic to determine if it could be used as a discriminator. Then more- and less-preferred areas for groups of discriminators were defined and composite maps were prepared and evaluated to identify the sites

  19. Identification of sites within the Palo Duro Basin. Volume 2. Palo Duro Location B

    International Nuclear Information System (INIS)

    1984-11-01

    This three-volume document narrows to two sites for continued investigations for potential nuclear waste repository sites in the Palo Duro Basin of the Texas Panhandle. Volume 1 narrows a site previously identified in Deaf Smith County, Texas; Volume 2 narrows a site previously identified in Swisher County, Texas; and Volume 3 contains responses to comments received regarding the drafts of Volumes 1 and 2 (BMI/ONWI-531). These volumes discuss the methodology and logic used as well as the results that narrowed these sites. Each of the 10 site performance criteria was divided into descriptors related to site performance characteristics. Each descriptor was evaluated by a systematic logic to determine if it could be used as a discriminator. Then more- and less-preferred areas for groups of discriminators were defined and composite maps were prepared and evaluated to identify the sites

  20. Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995

    International Nuclear Information System (INIS)

    Mendoza L, A.; Flores C, E.; Lopez G, C.P.F.

    1995-01-01

    The fourth refueling of the Unit 1 of Laguna Verde Nuclear Central was executed in the period of April 17 to May 31 of 1995 with the participation of a task group of 358 persons, included technicians and radiation protection officials and auxiliaries.The radiation monitoring and radiological surveillance to the workers was present length ways the refueling process and always attached to the ALARA criteria. The check points for radiation levels were set at: primary container or dry well, reloading floor, decontamination room (level 10.5), turbine building and radioactive waste building. To take advantage of the refueling process, rooms 203 and 213 of the turbine buildings were subject to inspection and maintenance work in valves, heaters and drains of heaters. Management aspects as personnel selection and training, costs, and countable are also presented in this report. Owing to the high cost of man-hour of the members of the ININ staff, its participation in the refueling process was in smaller number than years before. (Author)

  1. The LACDA (Los Angeles County Drainage Area) System Recreation Study, Los Angeles County Drainage Area.

    Science.gov (United States)

    1980-03-01

    Channel Islands and is not conveniently situ - tions, potential benefits are greatly increased by con- ated for the daily use of large numbers of people...are at least three races of birds and some plant species on the peninsula that are found nowhere else except the Channel Islands. 32. Agua Amarga Canyon...Class 3 (4,5,7) Agua Amarga Canyon is the last remaining relatively undisturbed drainage on the coastal side of the Palos Verdes Peninsula. There

  2. Abundancia, diversidad y categoría ecológica de los peces en estero damas y estero palo seco, Costa Rica

    Directory of Open Access Journals (Sweden)

    Hubert Araya

    2016-03-01

    Full Text Available Se trabajó de junio de 1986 a febrero de 1987 en una estación de muestreo en el estero Palo Seco y en dos en el estero Damas (Damas y San Bosco, Pacífico Central, Costa Rica. La temperatura del agua no presentó diferencias significativas entre las estaciones Damas y San Bosco, pero sí entre Damas-Palo Seco y San Bosco-Palo Seco. La salinidad varió significativamente entre las tres estaciones y el pH no mostró diferencias significativas. Se recolectaron representantes de 25 familias, 39 géneros y 54 especies. De las especies, 18 comparten los tres sitios de muestreo, siete se hallaron únicamente en Palo Seco, cinco en Damas y seis en San Bosco. De las especies recolectadas, el 7,41% es compartido entre Palo Seco y Damas; el 3,70% entre Palo Seco y San Bosco y el 22,22% entre Damas y San Bosco. El análisis de similitud determinó que las estaciones Damas y San Bosco comparten un 41,40% de las especies; mientras que Palo Seco solamente presento un 9,9% de especies comunes con el grupo Damas-San Bosco. La mayoría de las especies encontradas fueron de origen marino que utilizan estos dos esteros como área de crianza (42,59% y alimentación (40,74%; mientras que las de agua dulce, estuarinas y visitantes ocasionales están poco representadas. La mayor diversidad se encontró en San Bosco y se detectaron diferencias estadísticamente significativas en los valores de H' entre las estaciones. La mayor similitud de especies se presentó entre las estaciones Damas y San Bosco, lo que sugiere que estas áreas están bajo una mayor influencia de aguas continentales; lo que propicia que los peces estén más ampliamente distribuidos. Se deduce que la ictiofauna de los esteros estudiados es transitoria en los sitios de muestreo y que la misma se distribuye heterogéneamente.

  3. Estimation of seismic return periods in the Laguna Verde nuclear plant

    International Nuclear Information System (INIS)

    Flores R, J.H.

    1992-01-01

    The study of seismic risk in the area of the Laguna Verde Nucleo electric plant (PNLV) and its surroundings, one carries out estimating the different return periods and the occurrence probability in different intervals of time (5, 75, 100, 125, 150 years starting from the distribution of first type of Gumbel (G1) of extreme values (Burton, 1986), the value that was used to evaluate the useful life of the PNLV was of 50 years, the other periods will be occupy to evaluate 'temporal' nuclear cemeteries, that is to say for diminish the radioactive activity of the fuel assemblies already burned in the reactor pool or in a near place to the place. The seismic data that were used for the analysis were of the seismic catalog that it was elaborated from (1920-1982), around the place whose seismic half magnitude was of 5 grades Richter and a depth 65 km, these earthquakes are classified as shallow earthquakes, which are located in the continental plaque of North-America, these they are induced by the efforts of push of the plaque of Cocos, existing 36% of intermediate and 2 of deep earthquakes. (Author)

  4. Geochemical stratigraphy of submarine lavas (3-5 Ma) from the Flamengos Valley, Santiago, Cape Verde

    DEFF Research Database (Denmark)

    Barker, Abigail K; Holm, Paul Martin; Peate, David W.

    2009-01-01

    New high-precision Pb-Sr-Nd isotope, major and trace element and mineral chemistry data are presented for the submarine stage of ocean island volcanism on Santiago, one of the southern islands of the Cape Verde archipelago. Pillow basalts and hyaloclastites in the Flamengos Valley are divided...

  5. Active basement uplift as seen with cosmogenic lenses: the Sierra Pie de Palo case (Western Argentina)

    Science.gov (United States)

    Siame, L. L.; Sébrier, M.; Costa, C. H.; Ahumada, E. A.; Bellier, O.

    2013-12-01

    The Andean foreland of western Argentina (28°S-33°S) corresponds to retroarc deformations associated with the ongoing flat subduction of the Nazca plate beneath the South American lithosphere, and associated with high levels of seismic activity and crustal active faulting. To improve earthquake source identification and characterization in the San Juan region, data from seismology, structural geology and quantitative geomorphology can be integrated and combined to provide a seismotectonic model. In this model, the Andean back-arc of western Argentina has to be regarded as an obliquely converging foreland where Plio-Quaternary deformations are partitioned between strike-slip and thrust motions that are localized on the E-verging, thin-skinned Argentine Precordillera, and the W-verging thick-skinned Sierras Pampeanas, respectively. In this domain, the Sierra Pie de Palo is a key structure playing a major role in the partitioning of the Plio-Quaternary deformations. Located in the westernmost Sierras Pampeanas, the Sierra Pie de Palo forms a NNE striking, 80 km-long and 35-40 km-wide, ellipsoid range that reaches elevation as high as 3162 m. This mountain range is an actively growing basement fold associated with a high level of seismic activity (e.g., the November 23, 1977, Caucete, Mw 7.4 earthquake). To evaluate the degree of tectonic activity around the Sierra Pie de Palo, we combined a detailed morphometric analysis of the topography together with in situ-produced cosmogenic 10Be concentrations measured in (1) bedrock outcrops corresponding to the exhumed erosional regional surface, (2) surface boulders abandoned on alluvial fans deformed by active faults, and (3) in fluvial sediments sampled at the outlets of selected watersheds that drains out from the Sierra Pie de Palo. All together, our results allows: (1) assessing quantitative constraints on the rate of tectonic and denudation processes that are responsible for the active growth and erosion of the Sierra

  6. Area environmental characterization report of the Dalhart and Palo Duro basins in the Texas Panhandle. Volume II. Palo Duro basin

    International Nuclear Information System (INIS)

    1982-09-01

    This area report describes the environmental characteristics of the Dalhart and Palo Duro basins of the Texas Panhandle portion of the Permian basin. Both basins are rather sparsely populated, and the overall population is decreasing. The economic base is centered on agribusiness and manufacturing. Most of the potentially conflicting land uses in both basins (i.e., parks, historic sites) occupy small land areas, with the exception of a national grassland in the Dalhart and military air training routes in both basins. Ground transportation in the Dalhart basin is adequate, and it is well developed in the Palo Duro basin. In both basins irrigation constitutes the principal water use, and groundwater is the principal source. However, the dominant aquifer, the Ogallala, is being depleted. Both basins consist primarily of grasslands, rangelands, and agricultural areas. No critical terrestrial or aquatic habitats have been identified in the basins, though several endangered, threatened, or rare terrestrial species occur in or near the basins. Aquatic resources in both basins are limited because of the intermittent availability of water and the high salt content of some water bodies. Playa lakes are common, though usually seasonal or rain dependent. The climate of the area is semiarid, with low humidity, relatively high wind speeds, and high variable precipitation. Restrictive dispersion conditions are infrequent. National ambient secondary air quality standards for particulates are being exceeded in the area, largely because of fugitive dust, although there are some particulate point sources

  7. Multi-disciplinary organization for the completion and start-up of the Laguna Verde-2 power reactor

    International Nuclear Information System (INIS)

    1995-01-01

    The optimization of the human and material resources for the pre-operational tests in the Laguna Verde-2 nuclear plant is described. About three thousand specialist of different groups were involved and each one had its own routines and functions with a complicated communication system among them. The optimization aimed at integrating and coordinating the organizational resources and defining the goals to be reached

  8. Neutron dosimetry. Environmental monitoring in a BWR type reactor

    International Nuclear Information System (INIS)

    Tavera D, L.; Camacho L, M.E.

    1991-01-01

    The measurements carried out on reactor dosimetry are applied mainly to the study on the effects of the radiation in 108 materials of the reactor; little is on the environmental dosimetry outside of the primary container of BWR reactors. In this work the application of a neutron spectrometer formed by plastic detectors of nuclear traces manufactured in the ININ, for the environmental monitoring in penetrations around the primary container of the unit I of the Laguna Verde central is presented. The neutron monitoring carries out with purposes of radiological protection, during the operational tests of the reactor. (Author)

  9. Technical assistance in relationship with the reloading analysis of the Laguna Verde Unit 2 reactor. Executive abstract

    International Nuclear Information System (INIS)

    Alonso V, G.; Castro B, M.; Gallegos E, R.; Hernandez L, H.; Montes T, J.L.; Ortiz S, J. J.; Perusquia C, R.

    1993-11-01

    The objective of the report was to carry out a comparative analysis of costs of energy generation among the designs GE9B of General Electric, 9X9-IX of SIEMENS and SVEA-96 of ABB ATOM, proposed to be used as recharge fuel in the Unit 2 of the Laguna Verde Nuclear Power station. (Author)

  10. Core reactor simulation of the Central Laguna Verde (CLV) reactor in stationary state and an example of the application in the recharge options analysis of cycle 3; Simulacion del nucleo del reactor de la Central Laguna Verde (CLV) en estado estacionario y ejemplo de aplicacion en el analisis de alternativas de recarga del ciclo 3

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo Mansilla, Hector; Francois Lacouture, Juan Luis; Blanco Lara, Jesus; Cortes Campos, Carlos Cristobal; Esquivias Montoya, Jesus; Esquivel Torres, Jose Luis; Martin del Campo Marquez, Cecilia [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico); Sanchez Herrera, Luciano; Torres Alvarez, Carlos [Comision Federal de Electricidad (CFE), Mexico, D. F. (Mexico)

    1991-12-31

    The results are presented of a study requested by Comision Federal de Electricidad (CFE) for the analysis of Cycle 3, of Unit No. 1 of the Laguna Verde Nuclear Power Station (CLNV) and determine the burning effect impact, carried out with the starting tests and the operation of Cycles 1 and 2 on base of the cycle extension known as coastdown. The calculations were realized with the Code Package FMS for fuel managing, using the Code PRESTO-B that analyzes the reactor in detailed form in three dimensions an in stationary state. In the study the schemes of fraction of recharge proposed by General Electric (GE) were analyzed with the effect of cycle extension. The initial design value of 100 assemblies for Cycle 3, GE proposes to increase such fraction from 112 to 120 assemblies. This impacts the cost of the second recharge and the purpose of this investigation is to analyze options with higher fuel enrichment in U-235 to minimize the number of assemblies in this recharge. The analyses effected show that the designs proposed by GE do not fulfill the required energy proposed for the cycle, even using in the recharge only fuel with 3.03% of enrichment. It is proposed, likewise, the fuel enrichment up to 3.25% to satisfy the energy demand with a minimum of assemblies. [Espanol] Se presentan los resultados de un estudio solicitado por la Comision Federal de Electricidad (CFE) para analizar el ciclo 3, de la unidad 1 de la Central Laguna Verde (CLV), y determinar el impacto del efecto de quemado llevado a cabo con las pruebas de arranque y por la operacion de los ciclos 1 y 2 con base en la tecnica de alargamiento del ciclo conocida como coastdown1. Los calculos se realizaron con el paquete de codigos FMS para la administracion de combustible, usando el codigo PRESTO-B que analiza el reactor en forma detallada en tres dimensiones y en estado estacionario. Se analizaron en el estudio los esquemas de fraccion de recarga propuesta por la General Electric (GE) con el efecto de

  11. Core reactor simulation of the Central Laguna Verde (CLV) reactor in stationary state and an example of the application in the recharge options analysis of cycle 3; Simulacion del nucleo del reactor de la Central Laguna Verde (CLV) en estado estacionario y ejemplo de aplicacion en el analisis de alternativas de recarga del ciclo 3

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo Mansilla, Hector; Francois Lacouture, Juan Luis; Blanco Lara, Jesus; Cortes Campos, Carlos Cristobal; Esquivias Montoya, Jesus; Esquivel Torres, Jose Luis; Martin del Campo Marquez, Cecilia [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico); Sanchez Herrera, Luciano; Torres Alvarez, Carlos [Comision Federal de Electricidad (CFE), Mexico, D. F. (Mexico)

    1992-12-31

    The results are presented of a study requested by Comision Federal de Electricidad (CFE) for the analysis of Cycle 3, of Unit No. 1 of the Laguna Verde Nuclear Power Station (CLNV) and determine the burning effect impact, carried out with the starting tests and the operation of Cycles 1 and 2 on base of the cycle extension known as coastdown. The calculations were realized with the Code Package FMS for fuel managing, using the Code PRESTO-B that analyzes the reactor in detailed form in three dimensions an in stationary state. In the study the schemes of fraction of recharge proposed by General Electric (GE) were analyzed with the effect of cycle extension. The initial design value of 100 assemblies for Cycle 3, GE proposes to increase such fraction from 112 to 120 assemblies. This impacts the cost of the second recharge and the purpose of this investigation is to analyze options with higher fuel enrichment in U-235 to minimize the number of assemblies in this recharge. The analyses effected show that the designs proposed by GE do not fulfill the required energy proposed for the cycle, even using in the recharge only fuel with 3.03% of enrichment. It is proposed, likewise, the fuel enrichment up to 3.25% to satisfy the energy demand with a minimum of assemblies. [Espanol] Se presentan los resultados de un estudio solicitado por la Comision Federal de Electricidad (CFE) para analizar el ciclo 3, de la unidad 1 de la Central Laguna Verde (CLV), y determinar el impacto del efecto de quemado llevado a cabo con las pruebas de arranque y por la operacion de los ciclos 1 y 2 con base en la tecnica de alargamiento del ciclo conocida como coastdown1. Los calculos se realizaron con el paquete de codigos FMS para la administracion de combustible, usando el codigo PRESTO-B que analiza el reactor en forma detallada en tres dimensiones y en estado estacionario. Se analizaron en el estudio los esquemas de fraccion de recarga propuesta por la General Electric (GE) con el efecto de

  12. Technical basis for high-level waste repository land control requirements for Palo Duro Basin, Paradox Basin, and Richton Dome

    International Nuclear Information System (INIS)

    Chen, C.P.; Raines, G.E.

    1987-02-01

    Three sites, the Palo Duro Basin in Texas, the Paradox Basin in Utah, and the Richton Dome in Mississippi, are being investigated by the US Department of Energy for high-level radioactive-waste disposal in mined, deep geologic repositories in salt. This report delineates the use of regulatory, engineering, and performance assessment information to establish the technical basis for controlled area requirements. Based on the size of the controlled area determined, plus that of the geologic repository operations area, recommendations of possible land control or ownership area requirements for each locale are provided. On a technical basis, the following minimum land control or ownership requirements are recommended, assuming repository operations area of 2240 ac (907 ha), or 3.5 mi 2 (9.1 km 2 ): Palo Duro Basin - 4060 ac (1643 ha), or 6.3 mi 2 (16.4 km 2 ); Paradox Basin - 4060 ac (1643 ha), or 6.3 mi 2 (16.4 km 2 ); and Richton Dome - 5000 ac (2024 ha), or 7.8 mi 2 (20.2 km 2 ). Of the factors used to determine the technically based recommendations, one was found to dominate each locale. For the Palo Duro and Paradox Basins, the dominant factor was the need to limit potential radionuclide release by ground-water flow to the accessible environment. For the Richton Dome, the dominant factor was the need to limit the potential effects of solution mining on dome and repository integrity

  13. Multispectral image analysis of the Palo Duro Basin, Texas: Final report

    International Nuclear Information System (INIS)

    Andre, C.G.

    1986-09-01

    The objectives of this remote sensing study of the Palo Duro Basin are to: (1) detect the surface expression of regional subsurface structure; (2) locate previously unrecognized fractures; (3) interpret the data in terms of the geologic history of the Palo Duro Basin. Linear and circular surface features were mapped from Landsat 4 Thematic Mapper and NOAA-7 Advanced Very High Resolution Radiometer digital images of visible, near-infrared and thermal infrared bands. The density and orientation of features mapped are shown to be related to geological features, such as faults, structural arches, paleoerosion topography and salt dissolution zones. The approximate area covered by the three 185 km /times/ 170 km Thematic Mapper images studied extends southward from the Canadian River Breaks to the Sand Hills and eastward from the western Mountains in Oklahoma. The day and night thermal infrared images from the NOAA-7 satellite encompass an area that includes the northern half of Texas and most of the surrounding states to the east, west and north. 4 refs

  14. Camp Verde Adult Reading Program. Final Performance Report.

    Science.gov (United States)

    Maynard, David A.

    This document begins with a four-page performance report describing how the Camp Verde Adult Reading Program site was relocated to the Community Center Complex, and the Town Council contracted directly with the Friends of the Camp Verde Library to provide for the requirements of the program. The U.S. Department of Education grant allowed the…

  15. Improvement in dry active waste segregation and processing

    International Nuclear Information System (INIS)

    Hillmer, T.P.; Anderson, K.D.; Dahlen, D.E.

    1989-01-01

    At the Palo Verde Nuclear Generating Station (PVNGS) the majority of dry active waste (DAW) volume reduction activities are performed in the site's new DAW processing and storage facility. This facility houses an interim storage area for a five year volume of compacted DAW, a shredder/compactor, and a DAW segregation area. The DAW segregation program locates and separates non-radioactive and reusable materials from DAW generated at the three unit PVNGS site. This program has saved more than 24,000 cubic feet of burial space and has reclaimed more than $1,000,000 worth of materials. Palo Verde has made numerous changes to the DAW segregation program since its inception. To ensure that the DAW segregation program remained cost effective and in compliance with applicable regulatory guidance, segregation techniques were revised and new equipment was evaluated and procured. This paper details that effort and summarizes the operational data that has been collected

  16. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  17. Reproduction of the flow-power map of the Laguna Verde power plant

    International Nuclear Information System (INIS)

    Amador G, R.; Gonzalez M, V.M.

    1993-01-01

    The National Commission of Nuclear Safety and Safeguards (CNSNS) requires to have calculation tools which allows it to make analysis independent of the behavior of the reactor core of Laguna Verde nuclear power plant (CNLV) with the purpose to support the evaluation and discharge activities of the fuel recharges licensing. The software package Fms (Fuel Management System) allows to carry out an analysis of the core of the BWR type reactors along the operation cycle to detect possible anomalies and/or helping in the fuel management. In this work it is reproduced the flow-power for the CNLV using the Presto code of the Fms software package. The comparison of results with the map used by the operators of CNLV shows good agreement between them. Another exercise carried out was the changes study that the axial and radial power outlines undergo as well as the thermohydraulic parameters (LHGR, APLHGR, CPR) when moving a control rod. The obtained results show that is had the experience to effect analysis of the reactor behavior using the Presto-Fms code therefore the study of the rest of the software package for the obtention of nuclear parameters used in this code is recommended. (Author)

  18. Cape Verde

    Science.gov (United States)

    2007-01-01

    This Mars Exploration Rover Opportunity Pancam 'super resolution' mosaic of the approximately 6 m (20 foot) high cliff face of the Cape Verde promontory was taken by the rover from inside Victoria Crater, during the rover's descent into Duck Bay. Super-resolution is an imaging technique which utilizes information from multiple pictures of the same target in order to generate an image with a higher resolution than any of the individual images. Cape Verde is a geologically rich outcrop and is teaching scientists about how rocks at Victoria crater were modified since they were deposited long ago. This image complements super resolution mosaics obtained at Cape St. Mary and Cape St. Vincent and is consistent with the hypothesis that Victoria crater is located in the middle of what used to be an ancient sand dune field. Many rover team scientists are hoping to be able to eventually drive the rover closer to these layered rocks in the hopes of measuring their chemistry and mineralogy. This is a Mars Exploration Rover Opportunity Panoramic Camera image mosaic acquired on sols 1342 and 1356 (November 2 and 17, 2007), and was constructed from a mathematical combination of 64 different blue filter (480 nm) images.

  19. Applications of the monitor of loose parts in the cycle 6 of the Laguna Verde Unit 2 power plant

    International Nuclear Information System (INIS)

    Calleros, G.; Mendez, A.; Gomez, R.A.; Castillo, R.; Bravo, J.M.

    2004-01-01

    The monitor of loose parts (Loose Parts Monitoring System) installed in the Unit 2 of the Laguna Verde Central is a tool to detect strange objects or parts loose in the system of refrigeration of the reactor that could be impacted in the walls of the recirculation knots or in the internal of the reactor. In this work two applications are shown carried out with the Monitor of Loose Parts, determining the characteristics of the stable nominal conditions, those which when changing, they are used to diagnose during the Cycle 6 of the Unit 2, failures in the components of the the recirculation circuits or to identify mechanical vibrations of the recirculation knots induced by a flow of recirculation bistable associated to operative conditions of the reactor. (Author)

  20. Cabo Verde telemedicine program: initial results of nationwide implementation.

    Science.gov (United States)

    Latifi, Rifat; Dasho, Erion; Merrell, Ronald C; Lopes, Miguel; Azevedo, Vanda; Bekteshi, Flamur; Osmani, Kalterina L; Qesteri, Orland; Kucani, Julian; Lecaj, Ismet

    2014-11-01

    Telemedicine and e-health have been suggested as one solution for closing the health disparity gap between the developed world and the developing world. Yet evidence is lacking from current successful programs in the developing world and, in particular, from sub-Saharan Africa. The primary objective of our study was to present the preliminary results of our efforts in building the Integrated Telemedicine and e-Health Program for Cabo Verde (ITeHP-CV), with an emphasis on initial utilization and results. This is a prospective study of data collected while we worked to establish a fully functional, integrated national telemedicine network and virtual education network in Cabo Verde. We used the International Virtual e-Hospital Foundation strategic approach known as "initiate-build-operate-transfer" over a 26-month period (November 2011-December 2013). We describe herein the five main pillars of this process that have been implemented: (1) capacity building; (2) network development and deployment of equipment; (3) implementation of clinical telemedicine; (4) implementation of activities related to continuing medical education, delivered from within the country and from abroad; and (5) establishment and use of the electronic virtual library. Based on comprehensive technical and medical assessment of the country's needs, 10 fully functional telemedicine centers in all nine inhabited islands of the Republic of Cabo Verde have been established. RESULTS are presented under the five main pillars of capacity building, network deployment, implementation of clinical telemedicine, implementation of continuing medical education activities, and establishment of the electronic virtual library. The ITeHP-CV has been successfully launched, and the initial results are encouraging. The continuity of the program and sustainability are primary goals once the program is transferred fully to the Ministry of Health of Cabo Verde. A long-term follow-up study is required in order to ensure

  1. 76 FR 42725 - Notice of Availability of the Record of Decision for the Southern California Edison Company...

    Science.gov (United States)

    2011-07-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-17905, LLCAD06000 L51010000 ER0000 LVRWB09B1820] Notice of Availability of the Record of Decision for the Southern California Edison Company Devers-Palo Verde No. 2 Transmission Line Project, California AGENCY: Bureau of Land Management, Interior...

  2. Prefabricated solution to modular construction in Cape Verde

    Science.gov (United States)

    Vieira, Nuno; Amado, Miguel; Pinho, Fernando

    2017-02-01

    Nowadays, the lack of adequate housing in Cape Verde is a growing problem. The migration of the population living in the countryside to the major cities generates an increase of the diameter of the cities. With the lack of economic power, the migrating families tend to occupy the land with houses which don't present proper conditions to living. Praia is the capital of Cape Verde and so on the biggest city of the country. This fact leads Praia to being the city with major economic power and job offer in all country. Consequently, Praia has developed the biggest slum of the Cape Verde and it is urgent to approach this problem in order to create solutions that reveal capacity to start solving it. Cape Verde's unique dry subtropical climate turns indispensable a careful resolution of the housing, in order to ensure the comfort of the occupants. The modular construction is a solution with potential to approach this problem with a fast and economic response. In order to answer the situation, this article introduces a modular solution in order to reach the needing of thermal comfort to the specific case of Praia.

  3. Internal event analysis of Laguna Verde Unit 1 Nuclear Power Plant. System Analysis

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis of Laguna Verde Unit 1 Nuclear Power Plant , CNSNS-TR-004, in five volumes. The reports are organized as follows: CNSNS-TR-004 Volume 1: Introduction and Methodology. CNSNS-TR-004 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR-004 Volume 3: System Analysis. CNSNS-TR-004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR-004 Volume 5: Appendices A, B and C. This volume presents the results of the system analysis for the Laguna Verde Unit 1 Nuclear Power Plant. The system analysis involved the development of logical models for all the systems included in the accident sequence event tree headings, and for all the support systems required to operate the front line systems. For the Internal Event analysis for Laguna Verde, 16 front line systems and 5 support systems were included. Detailed fault trees were developed for most of the important systems. Simplified fault trees focusing on major faults were constructed for those systems that can be adequately represent,ed using this kind of modeling. For those systems where fault tree models were not constructed, actual data were used to represent the dominant failures of the systems. The main failures included in the fault trees are hardware failures, test and maintenance unavailabilities, common cause failures, and human errors. The SETS and TEMAC codes were used to perform the qualitative and quantitative fault tree analyses. (Author)

  4. Internal event analysis of Laguna Verde Unit 1 Nuclear Power Plant. System Analysis; Analisis de Eventos Internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Analisis de sistemas

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Aguilar T, O; Nunez C, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the {sup I}nternal Event Analysis of Laguna Verde Unit 1 Nuclear Power Plant{sup ,} CNSNS-TR-004, in five volumes. The reports are organized as follows: CNSNS-TR-004 Volume 1: Introduction and Methodology. CNSNS-TR-004 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR-004 Volume 3: System Analysis. CNSNS-TR-004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR-004 Volume 5: Appendices A, B and C. This volume presents the results of the system analysis for the Laguna Verde Unit 1 Nuclear Power Plant. The system analysis involved the development of logical models for all the systems included in the accident sequence event tree headings, and for all the support systems required to operate the front line systems. For the Internal Event analysis for Laguna Verde, 16 front line systems and 5 support systems were included. Detailed fault trees were developed for most of the important systems. Simplified fault trees focusing on major faults were constructed for those systems that can be adequately represent,ed using this kind of modeling. For those systems where fault tree models were not constructed, actual data were used to represent the dominant failures of the systems. The main failures included in the fault trees are hardware failures, test and maintenance unavailabilities, common cause failures, and human errors. The SETS and TEMAC codes were used to perform the qualitative and quantitative fault tree analyses. (Author)

  5. Intraplate seismicity across the Cape Verde swell

    Science.gov (United States)

    Vales, Dina; Matias, Luís.; Haberland, Christian; Silveira, Graça.; Weber, Michael; Carrilho, Fernando; Dias, Nuno

    2010-05-01

    The Cape Verde Archipelago ((15-17°N, 23-26°W) is located within the African plate, about 500km west of Senegal, in the African coast. The islands are located astride the Cape Verde mid-plate topographic swell, one of the largest features of its type in the world's ocean basins. The origin of this Cape Verde swell is still in debate. Previous determinations of the elastic thickness (Te) reveal a normal Te and a modest heat flow anomaly which suggest that the swell cannot be fully explained by uplift due to thermal reheating of the lithosphere by an underlying ‘‘hot spot'' and that other, deep-seated, mantle processes must be involved. The CV-PLUME (An investigation on the geometry and deep signature of the Cape Verde mantle plume) project intends to shape the geometry and deep origin of the Cape Verde mantle plume, via a combined study of seismic, magnetic, gravimetric and geochemical observations. Through this study we intend to characterize the structure beneath the archipelago from the surface down to the deep mantle. The core of this 3-year project was a temporary deployment of 39 Very Broad Band seismometers, across all the inhabited islands, to recorder local and teleseismic earthquakes. These instruments were operational from November 2007 to September 2008. In this work we report on the preliminary results obtained from the CV-PLUME network on the characterization of the local and regional seismicity. To detect the small magnitude seismic events the continuous data stream was screened using spectrograms. This proved to be a very robust technique in the face of the high short-period noise recorded by many of the stations, particularly during day time. The 10 month observation time showed that the background seismic activity in the Archipelago and surrounding area is low, with only a very few events recorded by the complete network. However, two clusters of earthquakes were detected close to the Brava Island, one to the NW and a second one, more active

  6. Environmental Impact Analysis Process. Final Environmental Impact Statement. Air Force, Space Division Housing Project, San Pedro, California

    Science.gov (United States)

    1986-07-24

    are expected to be equivalent and insignificant. The potable and fire-fighting water supply systems serving the southern portion of WP and BP may need...approximately 0.75 mile east of WP. Locations of other resources that have been utilized by the Palos Verdes blue have occurred in the Agua Amarga

  7. QUÍMICA VERDE: UN NUEVO RETO

    Directory of Open Access Journals (Sweden)

    Nerlis Paola Pájaro Castro

    2011-01-01

    Full Text Available En la actualidad, existe un enorme deterioro del medio ambiente que ha generado la necesidad de buscar alternativas que conduzcan a la sostenibilidad ambiental. Una de estas herramientas es la ¿química verde¿, concepto que contempla el diseño de productos y procesos que reduzcan la generación de sustancias peligrosas y maximicen la eficiencia en la utilización de recursos materiales y energéticos. El empleo de tecnologías menos contaminantes, permitirá a las empresas químicas mitigar los efectos ambientales asociados a su actividad, reduciendo el consumo de materiales e incrementando la participación de recursos renovables. Para alcanzar estas metas, se han propuesto 12 principios básicos de química verde, aplicables en diferentes campos, tales como la medicina, la agricultura, la industria química y farmacéutica. Esta revisión detalla los principios y usos principales de la química verde, y su aplicación como una filosofía de trabajo para avanzar hacia un verdadero desarrollo sostenible.

  8. Technical specifications, Palo Verde Nuclear Generating Station, Unit No. 1 (Docket No. 50-528). Appendix A to License No. NPF-34

    International Nuclear Information System (INIS)

    1984-12-01

    Technical specifications are presented concerning operating safety limits for reactivity control systems, power distribution, instrumentation, coolant system, emergency core cooling system, containment systems, plant systems, electrical power systems, refueling operations, radioactive effluents, and radiological environmental monitoring; design features of the reactor site, containment, reactor core, coolant system, and fuel storage; and administrative controls

  9. Analysis of internal events for the Unit 1 of the Laguna Verde nuclear power station; Analisis de eventos internos para la Unidad 1 de la Central Nucleolelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R. [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    This volume presents the results of the starter event analysis and the event tree analysis for the Unit 1 of the Laguna Verde nuclear power station. The starter event analysis includes the identification of all those internal events which cause a disturbance to the normal operation of the power station and require mitigation. Those called external events stay beyond the reach of this study. For the analysis of the Laguna Verde power station eight transient categories were identified, three categories of loss of coolant accidents (LOCA) inside the container, a LOCA out of the primary container, as well as the vessel break. The event trees analysis involves the development of the possible accident sequences for each category of starter events. Events trees by systems for the different types of LOCA and for all the transients were constructed. It was constructed the event tree for the total loss of alternating current, which represents an extension of the event tree for the loss of external power transient. Also the event tree by systems for the anticipated transients without scram was developed (ATWS). The events trees for the accident sequences includes the sequences evaluation with vulnerable nucleus, that is to say those sequences in which it is had an adequate cooling of nucleus but the remoting systems of residual heat had failed. In order to model adequately the previous, headings were added to the event tree for developing the sequences until the point where be solved the nucleus state. This process includes: the determination of the failure pressure of the primary container, the evaluation of the environment generated in the reactor building as result of the container failure or cracked of itself, the determination of the localization of the components in the reactor building and the construction of boolean expressions to estimate the failure of the subordinated components to an severe environment. (Author)

  10. Validation of the thermal balance of Laguna Verde turbine under conditions of extended power increase; Validacion del balance termico de turbina de Laguna Verde en condiciones de aumento de potencia extendido

    Energy Technology Data Exchange (ETDEWEB)

    Castaneda G, M. A.; Cruz B, H. J.; Mercado V, J. J.; Cardenas J, J. B.; Garcia de la C, F. M., E-mail: miguel.castaneda01@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2012-10-15

    The present work is a continuation of the task: Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt) in which the modeling of the vapor cycle of the nuclear power plant of Laguna Verde was realized with PEPSE code (Performance Evaluation of Power System Efficiencies). Once reached the conditions of nominal operation of extended power increase, operating both units to 2371 MWt; after the tests phase of starting-up and operation is necessary to carry out a verification of the proposed design of the vapor cycle for the new operation conditions. All this, having in consideration that the vapor cycle designer only knows the detail of the prospective performance of the main turbine, for all the other components (for example pumps, heat inter changers, valves, reactor, humidity separators and re-heaters, condensers, etc.) makes generic suppositions based on engineering judgment. This way carries out the calculations of thermal balance to determine the guaranteed gross power. The purpose of the present work is to comment the detail of the validation carried out of the specific thermal balance (thermal kit) of the nuclear power plant, making use of the design characteristics of the different components that conform the vapor cycle. (Author)

  11. Electrical Systems at Laguna Verde Nuclear Power Plant (LVNPP) after the Fukushima accident

    International Nuclear Information System (INIS)

    Lopez Jimenez, Jose Francisco

    2015-01-01

    the accident in Fukushima Daiichi, for this reason the main electrical equipment belonging to the offsite power system was changed and the electrical analysis was reviewed (such as: short-circuit, load flow, electrical stability analysis, etc.), 2) Generic Letter 2006-02 'Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power' is in process of implementation, this aims to verify that it maintains compliance with regulatory requirements which govern electrical systems and 3) the USNRC is in the process of reviewing the 10 CFR 50.63 and Regulatory Guide 1.155 'Station Blackout', once issued, CNSNS will require its implementation at Laguna Verde NPP. Based on the above, CNSNS concludes that all actions are being taken to enhance the robustness of Laguna Verde NPP's electrical systems, in order to increase their reliability, safety and operation as required in order to cope with events beyond design basis as that occurred at Fukushima Daiichi and avoid as far as possible damage to the reactor core. (authors)

  12. Kodanikupäev, kas ainult kalendri jaoks? / Urve Palo

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2007-01-01

    Ilmunud ka: Põhjarannik, 13. nov. 2007, lk. 4; Severnoje Poberezhje, 13. nov. 2007, lk. 4; Meie Maa, 13. nov. 2007, lk. 2; Valgamaalane, 13. nov. 2007, lk. 2; Nädalaleht, 9. nov. 2007, lk. 8; Lääne Elu, 15. nov. 2007, lk. 2; Koit, 15. nov. 2007, lk. 6; Virumaa Teataja, 22. nov. 2007, lk. 2; Pärnu Postimees, 24. nov. 2007, lk. 19. Rahvastikuminister Urve Palo sõnul on riigi ülesanne kindlustada turvaline Eesti riik - keskkond elamiseks, õppimiseks, töötamiseks, laste kasvatamiseks ning ühiskondlikuks tegevuseks

  13. Talento verde: caracterización y búsqueda

    Directory of Open Access Journals (Sweden)

    María del Carmen Torres-Salazar

    2015-01-01

    Full Text Available Introducción: Los impactos del calentamiento global y el cambio climático son una preocupación en prácticamente todos los sectores de la sociedad, debido a las consecuencias que ya se perciben y que afectarán cada día más tanto a los sistemas naturales como a los creados por el hombre, generalmente de forma negativa. Para revertir estos efectos negativos y no continuar deteriorando el medio ambiente, es necesario un tipo especial de personas que sean capaces de tomar las decisiones adecuadas en los ámbitos en los que se desenvuelven. En esta investigación, estos seres humanos se denominan: “personas con talento verde”. El término talento verde no ha sido caracterizado y su uso es aun restringido. Esta investigación hace una caracterización del talento verde y propone una encuesta para detectar a las personas que cuentan con estas características. En este artículo, se reporta solo la validación de la encuesta. Es importante hacer notar que este trabajo forma parte de una investigación más amplia que busca conocer la relación entre directivos con talento verde y prácticas de cadena de suministro sustentable. Método: La caracterización del talento verde se realizó a través de la metodología de representaciones sociales, de la cual surgieron una serie de preguntas que buscan las características de talento verde en directivos de empresas y que forman parte de una encuesta de mayor cobertura que fue piloteada para su validación. La confiabilidad se midió a través del Alfa de Crombach y la validez por un Análisis Factorial. Resultados: Se encontraron nueve aspectos que caracterizan a las personas con talento verde, con las cuales se construyeron también nueve preguntas. Estas preguntas se hicieron a 25 directivos de empresas que participan en la Cámara de la Industria de la Transformación (CANACINTRA con el objetivo de validar el instrumento. El alfa de Crombrach obtenido fue del 0.948 y el análisis factorial indica

  14. Recommended Species for Vegetative Stabilization of Training Lands in Arid and Semi-Arid Environments

    Science.gov (United States)

    1985-09-01

    bitterbrush Purshia glandulosa Apache plume Fallugia paradoxa Arizona fesce Festuca arizonica Ashe juniper Juniperus ashei Australian saltbush Atriplex...elm Ulmus crassifolia *Cheatgrass Bromus tectorum -Chinkapin oak Quercus muhlenbergii Cholla Opuntia, spp. * Cicer milkvetch Astragalus cicer Clovers...Linum lewisii Little bluestem Schizachyrium scoparium *Littleleaf palo verde Cercidium microphyllum *Live oak Quercus virginiana Lovegrasses Eragrostis

  15. Planting Seeds, Growing Diversity

    Science.gov (United States)

    Hua, Vanessa

    2011-01-01

    Last year, when students at Ridgecrest Intermediate School in Palos Verdes, California, were asked to name scientists, their answers--Benjamin Franklin, Thomas Edison, Albert Einstein, Bill Nye the Science Guy--reflected a common perception. Most of the leading scientists they came up with were white, male, or dead. Although women and people of…

  16. First status report on regional groundwater flow modeling for the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Andrews, R.W.

    1984-12-01

    Regional groundwater flow within the principal hydrogeological units of the Palo Duro Basin is evaluated by developing a conceptual model of the flow regime in the shallow aquifers and the deep-basin brine aquifers and testing these models using a three-dimensional, finite-difference flow code. Semiquantitative sensitivity analysis (a limited parametric study) is conducted to define the system response to changes in hydrologic properties or boundary conditions. Adjoint sensitivity analysis is applied to the conceptualized flow regime in the Wolfcamp carbonate aquifer. All steps leading to the final results and conclusions are incorporated in this report. The available data utilized in this study are summarized. The specific conceptual models, defining the areal and vertical averaging of lithologic units, aquifer properties, fluid properties, and hydrologic boundary conditions, are described in detail. The results are delineated by the simulated potentiometric surfaces and tables summarizing areal and vertical boundary fluxes, Darcy velocities at specific points, and groundwater travel paths. Results from the adjoint sensitivity analysis included importance functions and sensitivity coefficients, using heads or the average Darcy velocities as the performance measures. The reported work is the first stage of an ongoing evaluation of two areas within the Palo Duro Basin as potantial repositories for high-level radioactive wastes. The results and conclusions should thus be considered preliminary and subject to modification with the collection of additional data. However, this report does provide a useful basis for describing the sensitivity and, to a lesser extent, the uncertainty of the present conceptualization of groundwater flow within the Palo Duro Basin

  17. Restoration of eroded soil in the Sonoran Desert with native leguminous trees using plant growth-promoting microorganisms and limited amounts of compost and water.

    Science.gov (United States)

    Bashan, Yoav; Salazar, Bernardo G; Moreno, Manuel; Lopez, Blanca R; Linderman, Robert G

    2012-07-15

    Restoration of highly eroded desert land was attempted in the southern Sonoran Desert that had lost its natural capacity for self-revegetation. In six field experiments, the fields were planted with three native leguminous trees: mesquite amargo Prosopis articulata, and yellow and blue palo verde Parkinsonia microphylla and Parkinsonia florida. Restoration included inoculation with two of plant growth-promoting bacteria (PGPB; Azospirillum brasilense and Bacillus pumilus), native arbuscular mycorrhizal (AM) fungi, and small quantities of compost. Irrigation was applied, when necessary, to reach a rainy year (300 mm) of the area. The plots were maintained for 61 months. Survival of the trees was marginally affected by all supplements after 30 months, in the range of 60-90%. This variation depended on the plant species, where all young trees were established after 3 months. Plant density was a crucial variable and, in general, low plant density enhanced survival. High planting density was detrimental. Survival significantly declined in trees 61 months after planting. No general response of the trees to plant growth-promoting microorganisms and compost was found. Mesquite amargo and yellow palo verde responded well (height, number of branches, and diameter of the main stem) to inoculation with PGPB, AM fungi, and compost supplementation after three months of application. Fewer positive effects were recorded after 30 months. Blue palo verde did not respond to most treatments and had the lowest survival. Specific plant growth parameters were affected to varying degrees to inoculations or amendments, primarily depending on the tree species. Some combinations of tree/inoculant/amendment resulted in small negative effects or no response when measured after extended periods of time. Using native leguminous trees, this study demonstrated that restoration of severely eroded desert lands was possible. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. Transport processes near coastal ocean outfalls

    Science.gov (United States)

    Noble, M.A.; Sherwood, C.R.; Lee, Hooi-Ling; Xu, Jie; Dartnell, P.; Robertson, G.; Martini, M.

    2001-01-01

    The central Southern California Bight is an urbanized coastal ocean where complex topography and largescale atmospheric and oceanographic forcing has led to numerous sediment-distribution patterns. Two large embayments, Santa Monica and San Pedro Bays, are connected by the short, very narrow shelf off the Palos Verdes peninsula. Ocean-sewage outfalls are located in the middle of Santa Monica Bay, on the Palos Verdes shelf and at the southeastern edge of San Pedro Bay. In 1992, the US Geological Survey, together with allied agencies, began a series of programs to determine the dominant processes that transport sediment and associated pollutants near the three ocean outfalls. As part of these programs, arrays of instrumented moorings that monitor currents, waves, water clarity, water density and collect resuspended materials were deployed on the continental shelf and slope information was also collected on the sediment and contaminant distributions in the region. The data and models developed for the Palos Verdes shelf suggest that the large reservoir of DDT/DDE in the coastal ocean sediments will continue to be exhumed and transported along the shelf for a long time. On the Santa Monica shelf, very large internal waves, or bores, are generated at the shelf break. The near-bottom currents associated with these waves sweep sediments and the associated contaminants from the shelf onto the continental slope. A new program underway on the San Pedro shelf will determine if water and contaminants from a nearby ocean outfall are transported to the local beaches by coastal ocean processes. The large variety of processes found that transport sediments and contaminants in this small region of the continental margin suggest that in regions with complex topography, local processes change markedly over small spatial scales. One cannot necessarily infer that the dominant transport processes will be similar even in adjacent regions.

  19. Fluid inclusion brine compositions from Palo Duro Basin salt sites

    International Nuclear Information System (INIS)

    Moody, J.B.

    1987-01-01

    The fluid inclusion analyses were done on salt samples from Lower San Andres Cycle 4 and 5. The stable isotope composition of the fluid inclusion brines was measured on duplicate samples taken from the same fluid inclusion brine for correlation of geochemical content with the stable isotopic content. The analyzed Palo Duro Basin salt fluid inclusions are predominantly one phase, i.e., the presence of a fluid only. However, many of the larger fluid inclusions do have a small vapor bubble. This liquid/vapor ratio is so high in these vapor-containing fluid inclusions that their behavior in a thermal gradient would be almost identical to that of all liquid inclusions. Closely associated with the fluid inclusions are cryptomelane where some fibers penetrate into halite host crystal. The fluid inclusions have a wide variability in content for those components that were analyzed, even within the same salt type. The fluid inclusion brines are also acidic, ranging from 3 to 6 as measured with pH test papers

  20. The role of eclogite in the mantle heterogeneity at Cape Verde

    DEFF Research Database (Denmark)

    Barker, Abigail Katrine; Holm, Paul Martin; Troll, Valentin R.

    2014-01-01

    The Cape Verde hotspot, like many other Ocean Island Basalt provinces, demonstrates isotopic heterogeneity on a 100–200 km scale. The heterogeneity is represented by the appearance of an EM1-like component at several of the southern islands and with a HIMU-like component present throughout...... have been limited. We apply the minor elements in olivine approach (Sobolev et al. in Nature 434:590–597, 2005; Science, doi:10.1126/science.1138113, 2007), to determine and quantify the contributions of peridotite, pyroxenite and eclogite melts to the mantle heterogeneity observed at Cape Verde. Cores...... of olivine phenocrysts of the Cape Verde volcanics have low Mn/FeO and low Ni*FeO/MgO that deviate from the negative trend of the global array. The global array is defined by mixing between peridotite and pyroxenite, whereas the Cape Verde volcanics indicate contribution of an additional eclogite source...

  1. Range of the radiation monitor for the rigid vent of primary containment during normal and emergency operation for a BWR-5 in Laguna Verde

    International Nuclear Information System (INIS)

    Tijerina S, F.; Pozos S, A. M.; Cabrera U, S.; Mata A, J. A.; Sandoval V, S.; Ovando C, R.; Vargas A, A.; Gallardo R, I.; Cruz G, M.; Amador C, C.

    2014-10-01

    The earthquake followed by a tsunami, happened in March, 2011 in the coasts of oriental Japan, caused damages in the nuclear power plants 1 at 4 of Fukushima Daiichi leading to damage of the fuel in three of the reactors and to the radiation liberation to the exterior. As consequence of those events, the regulations requires that the power plants with Primary Containment type Mark I and II evaluate to have a system of rigid vent with a monitoring equipment of radiation effluents. The present work covers the rigid vent of diameter 12 of the Primary Containment, type Mark-II, of nuclear power plant of Laguna Verde in conditions of severe accident and normal operation, low regime of Extended Power Up rate (EPU - 2317 MWt), using the codes MAAP3B, MICROSHILED 5.05 and the Bardach Black Boxes methodology. As a result the measurement range of the radiation monitor that is required for monitoring the gassy liberation to the atmosphere was determined. The conclusion is that the superior limit of the range of the radiation meter during a Severe Accident is of 8.55 E + 05 R/h (8.55 E + 08 m R/h) and the superior limit in normal operation of 1.412 E-11 at 2.540 E-7 R/h (1.412 E-14 at 2.540 E-10 m R/h). (Author)

  2. Clima, cultura y disponibilidad de espacios verdes urbanos

    OpenAIRE

    Sierra, Eduardo Mario; Pérez, Silvia Patricia; Nizzero, Gustavo Raúl

    2002-01-01

    p.165-171 El rápido crecimiento urbano mundial hace que la calidad de vida dependa cada vez más de la disponibilidad de espacios verdes. Este trabajo trata de relacionar la disponibilidad de espacios verdes urbanos públicos con los factores climáticos y culturales. Las ciudades del Hemisferio Norte en países de cultura europea, donde se llevan a cabo programas de sustentabilidad muestran mayores disponibilidades lo cual refleja el impacto de los factores culturales. Desde el punto de vista...

  3. Actinides inventory of the nuclear power plant of Laguna Verde Unit 1; Inventario de actinidos de la Central Nuclear Laguna Verde Unidad 1

    Energy Technology Data Exchange (ETDEWEB)

    Martinez C, E.; Ramirez S, J. R. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Alonso V, G., E-mail: eduardo.martinez@inin.gob.mx [IPN, Escuela Superior de Fisica y Matematicas, Av. Instituto Politecnico Nacional s/n, U. P. Adolfo Lopez Mateos, Col. San Pedro Zacatenco, 07738 Mexico D. F. (Mexico)

    2013-10-15

    At the present time 435 nuclear power reactors exist for the electricity generation operating in the world and 63 in construction. Mexico has two reactors type BWR in the nuclear power plant of Laguna Verde. The nuclear fuel that is used in the nuclear reactors is retired of the reactor core when the energy that this contained has been extracted. This used fuel is known as spent nuclear fuel, the problem with this fuel is that was irradiated inside the reactor and continuous emitting a high radiation, as well as a significant heat quantity when being extracted, for what is necessary to maintain it in cooling and with some shielding to be protected of the radiation that emits. This objective is achieved confining the fuel in the spent nuclear fuel pool, where it is cooled and the same pool provides the necessary shielding to maintain the surroundings in safety radiation levels for the personnel that work in the power plant. An inconvenience of the pools is its limited storage capacity and that after certain time is necessary to remove the fuel, according to the established regulation to continue operating. To correct this inconvenience, two alternatives of spent fuel disposition exist, 1) the final disposition in deep geologic repositories and 2) the reprocessing and recycled of spent fuel. Each alternative presents its particularities and specific problems; however taking many years to be able to implement anyone of them. To carry out the second option, is indispensable to estimate the total mass of actinides generated in the spent nuclear fuel, that which represents to develop a methodology for it, this action is the main purpose of the present work. Inside our calculation method was necessary to appeal to diverse computation tools as the codes Origin-S and Keno V.a. Later on the obtained were compared with a problem type Benchmark, being obtained a smaller absolute error to 1.0%. (Author)

  4. Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza L, A; Flores C, E; Lopez G, C P.F.

    1996-12-31

    The fourth refueling of the Unit 1 of Laguna Verde Nuclear Central was executed in the period of April 17 to May 31 of 1995 with the participation of a task group of 358 persons, included technicians and radiation protection officials and auxiliaries.The radiation monitoring and radiological surveillance to the workers was present length ways the refueling process and always attached to the ALARA criteria. The check points for radiation levels were set at: primary container or dry well, reloading floor, decontamination room (level 10.5), turbine building and radioactive waste building. To take advantage of the refueling process, rooms 203 and 213 of the turbine buildings were subject to inspection and maintenance work in valves, heaters and drains of heaters. Management aspects as personnel selection and training, costs, and countable are also presented in this report. Owing to the high cost of man-hour of the members of the ININ staff, its participation in the refueling process was in smaller number than years before. (Author).

  5. A radiation monitoring system model for the Laguna Verde nuclear power training simulator

    International Nuclear Information System (INIS)

    Ocampo, M.H.; DeAlbornoz, B.A.

    1988-01-01

    A model for the Radiation Monitoring System of the Laguna Verde Boiling Water Reactor training simulator is presented. This model comprises enough definitions to assure interactions with the processes related, directly or indirectly, with the transport of radioisotopes. It is capable of following a dynamic behavior of the plant so an operator could be trained to become aware of nuclear radiation hazards. The model is composed of three parts: the electronics for the Process and Area Radiation Monitoring System; a lumped parameter transport model for the most representative radioisotopes; and the interactions with the modeled processes as well as with process not being simulated. The first part represents the radiation monitor controls in the vertical board panels of the nuclear station. The second part allows the carrying of nuclear isotopes between processes. The third part defines the way that the process interacts with the electronics at the point of release to environment or the point of detection. Each part of the model has been tested individually, and the transport model has been incorporated as a part of each process required to simulate nuclear radiation. The model parameters has been calculated using typical BWR nuclear radiation data, and Laguna Verde heat balance data at 100% design power. However, tunning will be necessary once the Simulator is integrated and tested. The tunning allows each detecting channel to behave as expected

  6. Analysis of the integrity of the pressure vessel of the BWR type nuclear reactor

    International Nuclear Information System (INIS)

    Silva Luna, O.

    1982-01-01

    The presssure vessel of a BWR type reactor was monitored for cracking during alternating events of its in-service life. The monitoring was to determine criticality of fractures catastrophic fractures and the velocity of fracture propagation. Detected cracks were evaluated as specified in ASME code section XI, of a minimum wall thickness of 2.5% crack growths were compared a) of 1/10 of the critical maximum size and b) at in-service inspection intervals according to ASME recommendations to be established at the Laguna Verde nuclear plant. Finally conclusions are made and discussed. (author)

  7. Analysis of vortex phenomena in PWRs at reduced inventory conditions

    International Nuclear Information System (INIS)

    Waldrep, G.W.; Field, R.W.

    1990-01-01

    Several recent events have occurred in pressurized water reactors in which shutdown cooling flow has been lost. This has resulted in considerable concern in the industry with operation at or near mid-loop conditions during shutdown operations. Although operation at mid-loop conditions can be minimized, it cannot be totally eliminated without fully off-loading the core. The primary concern is that at reduced inventory conditions and with high flow rates [>15 m 3 /min (4,000 gal/min)], air entrainment due to vortexing can occur. Although the Palo Verde Nuclear Generating Station (PVNGS) (operated by Arizona Public Service) never experienced an actual loss of shutdown cooling, several instances occurred in which evidence of air entrainment was observed. These indications include pump amp oscillations, flow noises, bubbles in the tygon-level monitoring system, and discharge flow/pressure oscillations. These occurrences as well as the NRC's concerns heightened Arizona Public Service's desire to thoroughly understand the actual flow characteristics and vortex phenomena in a Combustion Engineering System 80 pressurized water reactor

  8. 75 FR 9623 - Arizona Public Service Company, et al.; Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-03

    ... pressurized-water reactors located in Maricopa County, Arizona. 2.0 Request/Action Title 10 of the Code of... pressure boundary during normal operating and hydrostatic or leak rate testing conditions. Specifically, 10... NRC's March 16, 2001, SE, the staff noted, ``[t]he CE NSSS [nuclear steam supply system] methodology...

  9. 77 FR 9974 - Notice of Entering Into a Compact With the Republic of Cape Verde

    Science.gov (United States)

    2012-02-21

    ... Republic of Cape Verde AGENCY: Millennium Challenge Corporation. ACTION: Notice. SUMMARY: In accordance..., and the Republic of Cape Verde. Representatives of the United States Government and the Republic of Cape Verde executed the Compact documents on February 10, 2012. Dated: February 14, 2012. Melvin F...

  10. NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.

  11. Radiological survey of the low-level radioactive waste burial site at the Palos Forest Preserve, Illinois

    International Nuclear Information System (INIS)

    Hayes, K.A.

    1982-01-01

    Two landfill sites containing low-level radioactive waste material, Site A and Plot M, are located 14 miles southwest of Chicago, Illinois in the Palos Forest Preserve. Site A is the former location of the Argonne National Laboratory. Buried at Site A in 1956 were the dismantled reactor shells, building walls, and cooling towers from three of the world's first nuclear reactors. Plot M was used from 1943 to 1949 for burial of low-level radioactive wastes derived from Site A operations and from the University of Chicago Metallurgical Laboratory. Tritiated water was detected in 1973 in some of the Forest Preserve picnic wells located 500 to 1000 yards north of Plot M. An extensive surveillance program was initiated in 1976 to: (1) study the elevated tritium content of some picnic wells and its observed seasonal fluctuations, (2) establish if other radionuclides buried in Plot M or remaining at Site A have migrated, (3) establish the rate of groundwater movement in the glacial till and underlying dolomite aquifer, (4) determine the tritium content of the till and aquifer, and (5) predict future tritium levels in the well water. Several test wells were installed in the soil and dolomite bedrock to monitor radioactivity in groundwater, measure water levels, and provide other geohydrological information. Tritium has migrated from the Plot M burial trenches into the surrounding drift. The tritium plume, the contaminated zone in the drift in which tritium concentrations exceed 10 nanocuries per liter of water (nCi/L), has migrated at least 165 feet horizontally northward and 130 feet vertically downward to the bedrock surface. Small amounts of other radionuclides - uranium, plutonium, and strontium-90 - have been found in boreholes beneath the concrete cap covering Plot M, but not in the subsoil outside of the Plot. The radionuclide concentrations found to date are too low to result in any measureable radiation exposure to the public

  12. Is a changing climate affecting the tropical cyclone behavior of Cape Verde?

    Science.gov (United States)

    Emmenegger, T. W.; Mann, M. E.; Evans, J. L.

    2016-12-01

    An existing dataset of synthetic tropical cyclone (TC) tracks derived from climate change simulations were used to explore TC variability within a 250 km radius of the Cape Verde Islands (16.5388N, 23.0418W). The synthetic sets were examined according to genesis point location, track projection, intensity, frequency, and seasonality within the observational era (1851 AD to present). These factors of TC variability have been shown to be strongly related to climate oscillations, thus the historical era was grouped by the increasing and decreasing regimes of sea surface temperature (SST) in the main development region (MDR) of the Atlantic Ocean. Numerous studies have examined Atlantic Basin activity throughout this era; the goal of this study is to investigate possible variations in TC behavior around Cape Verde, ultimately determining whether Cape Verde experiences similar fluctuations in activity as observed basin-wide. We find that several facets of TC variability such as intensity, seasonality, and genesis point location around Cape Verde are not significantly different to that of the entire basin, thus forecasts of the entire basin in these respects may also apply to our site. A long-term trend of increasing TC frequency can be identified basin-wide within the observed set, yet activity around Cape Verde does not display this same behavior observably or in any synthetic set. A relationship between the location of genesis points and the regimes of SST fluctuation is shown to be existent. We find both more observed and synthetic genesis points within the vicinity of Cape Verde during cool periods, and an eastward and equatorward shift in cyclogenesis is evident during warm regimes. This southeastern shift in genesis points attributes to the increased intensities of TCs seen during periods of warmer SST. Years of increased SST are additionally linked to an earlier seasonality in Cape Verde.

  13. Validation of a new software version for monitoring of the core of the Unit 2 of the Laguna Verde power plant with ARTS; Validacion de una nueva version del software para monitoreo del nucleo de la Unidad 2 de la Central Laguna Verde con ARTS

    Energy Technology Data Exchange (ETDEWEB)

    Calleros, G.; Riestra, M.; Ibanez, C.; Lopez, X.; Vargas, A.; Mendez, A.; Gomez, R. [CFE, Central Nucleoelectrica de Laguna Verde, Alto Lucero, Veracruz (Mexico)]. e-mail: gcm9acpp@cfe.gob.mx

    2005-07-01

    In this work it is intended a methodology to validate a new version of the software used for monitoring the reactor core, which requires of the evaluation of the thermal limits settled down in the Operation Technical Specifications, for the Unit 2 of Laguna Verde with ARTS (improvements to the APRMs, Rod Block Monitor and Technical specifications). According to the proposed methodology, those are shown differences found in the thermal limits determined with the new versions and previous of the core monitoring software. Author)

  14. Validation of the thermal balance of Laguna Verde turbine under conditions of extended power increase

    International Nuclear Information System (INIS)

    Castaneda G, M. A.; Cruz B, H. J.; Mercado V, J. J.; Cardenas J, J. B.; Garcia de la C, F. M.

    2012-10-01

    The present work is a continuation of the task: Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt) in which the modeling of the vapor cycle of the nuclear power plant of Laguna Verde was realized with PEPSE code (Performance Evaluation of Power System Efficiencies). Once reached the conditions of nominal operation of extended power increase, operating both units to 2371 MWt; after the tests phase of starting-up and operation is necessary to carry out a verification of the proposed design of the vapor cycle for the new operation conditions. All this, having in consideration that the vapor cycle designer only knows the detail of the prospective performance of the main turbine, for all the other components (for example pumps, heat inter changers, valves, reactor, humidity separators and re-heaters, condensers, etc.) makes generic suppositions based on engineering judgment. This way carries out the calculations of thermal balance to determine the guaranteed gross power. The purpose of the present work is to comment the detail of the validation carried out of the specific thermal balance (thermal kit) of the nuclear power plant, making use of the design characteristics of the different components that conform the vapor cycle. (Author)

  15. Larvicidal activity against Aedes aegypti of Foeniculum vulgare essential oils from Portugal and Cape Verde.

    Science.gov (United States)

    Rocha, Diara Kady; Matosc, Olivia; Novoa, Maria Teresa; Figueiredo, Ana Cristina; Delgado, Manuel; Moiteiro, Cristina

    2015-04-01

    Dengue is a potentially fatal mosquito-borne infection with 50 million cases per year and 2.5 billion people vulnerable to the disease. This major public health problem has recurrent epidemics in Latin America and occurred recently in Cape Verde and Madeira Island. The lack of anti-viral treatment or vaccine makes the control of mosquito vectors a high option to prevent virus transmission. Essential oil (EO) constituents can affect insect's behaviour, being potentially effective in pest control. The present study evaluated the potential use of Foenicultm vulgare (fennel) EO in the control of the dengue vector Aedes aegypti. EOs isolated from fennel aerial parts collected in Cape Verde and from a commercial fennel EO of Portugal were analysed by NMR, GC and GC-MS. trans-Anethole (32 and 30%, respectively), limonene (28 and 18%, respectively) and fenchone (10% in both cases) were the main compounds identified in the EOs isolated from fennel from Cape Verde and Portugal, respectively. The larvicidal activity of the EOs and its major constituents were evaluated, using WHO procedures, against third instar larvae ofAe. aegypti for 24 h. Pure compounds, such as limonene isomers, were also assayed. The lethal concentrations LC50, C90 and LC99 were determined by probit analysis using mortality rates of bioassays. A 99% mortality of Ae. aegypti larvae was estimated at 37.1 and 52.4 µL L-1 of fennel EOs from Cape Verde and Portugal, respectively. Bioassays showed that fennel EOs from both countries displayed strong larvicidal effect against Ae. aegypti, the Cape Verde EO being as active as one of its major constituents, (-)-limonene.

  16. AMIDO RESISTENTE EM FARINHAS DE BANANA VERDE

    Directory of Open Access Journals (Sweden)

    Dayana Portes RAMOS

    2010-03-01

    Full Text Available

    Este trabalho teve por objetivo avaliar o teor de amido resistente (AR em farinhas de banana verde produzidas a partir de treze genótipos de bananeira. Para a produção da farinha foram separadas a 1ª, 3ª e 5ª pencas de cada genótipo, na qual cada penca correspondeu a uma repetição. Os frutos de cada penca no estádio 1 (casca completamente verde de maturação foram descascados manualmente, cortados em fatias circulares de 0,5 cm e desidratados em estufa com circulação de ar a 40ºC por 48 horas, sendo em seguida moídos. A análise de AR consistiu em um processo enzimático, calculando-se o conteúdo final pela concentração de glicose liberada. Os resultados foram submetidos à análise estatística e mostraram diferenças significativas para o teor de AR nas farinhas obtidas dos genótipos de bananeira, sendo que a farinha com maior teor de AR foi a produzida a partir do cultivar ‘Nam’ (40,25% e a menor pelo híbrido ‘Fhia 01’ (10,01%. Pode-se concluir que o conteúdo de AR varia em relação ao genótipo utilizado para a confecção da farinha e que a banana pode ser uma boa opção de estudo de alimento funcional.

  17. Population size, breeding biology and on-land threats of Cape Verde petrel (Pterodroma feae) in Fogo Island, Cape Verde.

    Science.gov (United States)

    Militão, Teresa; Dinis, Herculano Andrade; Zango, Laura; Calabuig, Pascual; Stefan, Laura M; González-Solís, Jacob

    2017-01-01

    Cape Verde petrel (Pterodroma feae) is currently considered near threatened, but little is known about its population size, breeding biology and on land threats, jeopardizing its management and conservation. To improve this situation, we captured, marked and recaptured (CMR) birds using mist-nets over 10 years; measured and sexed them; monitored up to 14 burrows, deployed GPS devices on breeders and analyzed activity data of geolocators retrieved from breeders in Fogo (Cape Verde). We set cat traps over the colony and investigated their domestic/feral origin by marking domestic cats from a nearby village with transponders, by deploying GPS devices on domestic cats and by performing stable isotope analyses of fur of the trapped and domestic cats. The population of Fogo was estimated to be 293 birds, including immatures (95% CI: 233-254, CMR modelling). Based on geolocator activity data and nest monitoring we determined the breeding phenology of this species and we found biometric differences between sexes. While monitoring breeding performance, we verified a still ongoing cat predation and human harvesting. Overall, data gathered from trapped cats without transponder, cats GPS trips and the distinct isotopic values between domestic and trapped cats suggest cats visiting the colony are of feral origin. GPS tracks from breeders showed birds left and returned to the colony using the sector NE of the islands, where high level of public lights should be avoided specially during the fledging period. Main threats for the Cape Verde petrel in the remaining breeding islands are currently unknown but likely to be similar to Fogo, calling for an urgent assessment of population trends and the control of main threats in all Cape Verde Islands and uplisting its conservation status.

  18. Population size, breeding biology and on-land threats of Cape Verde petrel (Pterodroma feae in Fogo Island, Cape Verde.

    Directory of Open Access Journals (Sweden)

    Teresa Militão

    Full Text Available Cape Verde petrel (Pterodroma feae is currently considered near threatened, but little is known about its population size, breeding biology and on land threats, jeopardizing its management and conservation. To improve this situation, we captured, marked and recaptured (CMR birds using mist-nets over 10 years; measured and sexed them; monitored up to 14 burrows, deployed GPS devices on breeders and analyzed activity data of geolocators retrieved from breeders in Fogo (Cape Verde. We set cat traps over the colony and investigated their domestic/feral origin by marking domestic cats from a nearby village with transponders, by deploying GPS devices on domestic cats and by performing stable isotope analyses of fur of the trapped and domestic cats. The population of Fogo was estimated to be 293 birds, including immatures (95% CI: 233-254, CMR modelling. Based on geolocator activity data and nest monitoring we determined the breeding phenology of this species and we found biometric differences between sexes. While monitoring breeding performance, we verified a still ongoing cat predation and human harvesting. Overall, data gathered from trapped cats without transponder, cats GPS trips and the distinct isotopic values between domestic and trapped cats suggest cats visiting the colony are of feral origin. GPS tracks from breeders showed birds left and returned to the colony using the sector NE of the islands, where high level of public lights should be avoided specially during the fledging period. Main threats for the Cape Verde petrel in the remaining breeding islands are currently unknown but likely to be similar to Fogo, calling for an urgent assessment of population trends and the control of main threats in all Cape Verde Islands and uplisting its conservation status.

  19. Analysis of internal events for the Unit 1 of the Laguna Verde nuclear power station

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    This volume presents the results of the starter event analysis and the event tree analysis for the Unit 1 of the Laguna Verde nuclear power station. The starter event analysis includes the identification of all those internal events which cause a disturbance to the normal operation of the power station and require mitigation. Those called external events stay beyond the reach of this study. For the analysis of the Laguna Verde power station eight transient categories were identified, three categories of loss of coolant accidents (LOCA) inside the container, a LOCA out of the primary container, as well as the vessel break. The event trees analysis involves the development of the possible accident sequences for each category of starter events. Events trees by systems for the different types of LOCA and for all the transients were constructed. It was constructed the event tree for the total loss of alternating current, which represents an extension of the event tree for the loss of external power transient. Also the event tree by systems for the anticipated transients without scram was developed (ATWS). The events trees for the accident sequences includes the sequences evaluation with vulnerable nucleus, that is to say those sequences in which it is had an adequate cooling of nucleus but the remoting systems of residual heat had failed. In order to model adequately the previous, headings were added to the event tree for developing the sequences until the point where be solved the nucleus state. This process includes: the determination of the failure pressure of the primary container, the evaluation of the environment generated in the reactor building as result of the container failure or cracked of itself, the determination of the localization of the components in the reactor building and the construction of boolean expressions to estimate the failure of the subordinated components to an severe environment. (Author)

  20. Development of a methodology for the economical analysis of fuel cycles, application to the Laguna Verde central; Desarrollo de una metodologia para el analisis economico de ciclos de combustible, aplicacion a la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Malfavon, S.M.; Trejo, M.G.; Hernandez, H. [FI-UNAM, 04500 Mexico D.F. (Mexico); Francois, J.L.; Ortega, R.F. [FI-UNAM, Paseo Cuauhnahuac 8532, Jiutepec, Morelos (Mexico)

    2003-07-01

    In this work a methodology developed to carry out the economical analysis of the fuel cycle of a nuclear reactor is presented. The methodology was applied to the Laguna Verde Nuclear Power Station (CNLV). The design of the reload scenarios of the CNLV are made with the Core Master Presto code (CM-Presto), three-dimensional simulator of the reactor core, the launched data by this, as well as the information of the Energy use plan (PUE), it allowed us to obtain reliable results through the fitness of an algorithm of economic calculation that considers all the components of the fuel cycle to present worth. With the application of the methodology it was obtained the generated energy, as well as their respective cost of each sub lot type of assemblies by operation cycle, from the start-up of the CNLV until September 13, 2002. Using the present worth method its were moved all the values at November 5, 1988, date of operation beginning. To the final of the analysis an even cost of 6.188 mills/kWh was obtained for those first 9 cycles of the Unit 1 of the CNLV, being observed that the costs of those first 3 operation cycles are the more elevated. Considering only the values starting from the cycle 4, the levelled cost turns out to be of 5.96 mills/kWh. It was also obtained the cost by fuel lot to evaluate the performance of assemble with the same physical composition. (Author)

  1. Operating Experience with the BR-5 Reactor; Experience acquise aupres du reacteur BR-5; Opyt ehkspluatatsii reaktora BR-5; Experiencia practica con el reactor BR-5

    Energy Technology Data Exchange (ETDEWEB)

    Lejpunskij, A. I.; Kazachkovskij, O. D.; Pinkhasik, M. S.; Aristarkhov, N. N.; Karpov, A. V.; Larin, E. P.; Efimov, I. A.

    1963-10-15

    The paper discusses the carrying-out of repair and maintenance work on the radioactive liquid-metal circuit of the BR-5 fast neutron reactor. Attention is also given to problems of reactor operation after achievement of the planned 2% fuel burn-up with some disturbance of leak-tightness in individual fuel elements. An account is given of experience in discharging the active section, examining the condition and leak-tightness of the fuel elements, and decontaminating the equipment and piping of the first radioactive circuit after reaching 5% fuel burn-up. (author) [French] Dans ce memoire les auteurs decrivent l'execution des reparations et des travaux d'entretien dans le circuit radioactif liquide-metal du reacteur a neutrons rapides BR-5. Ils etudient egalement les problemes lies au fonctionnement du reacteur au taux de combustion de 2% prevu avec quelques defauts d'etancheite dans des elements combustibles particuliers. Ils decrivent le dechargementen zone active et examinent les conditions d'etancheite des elements combustibles. Ainsi que la decontamination de l'appareillage et des tuyauteries du premier circuit radioactif apres avoir atteint un taux de combustion de 5%. (author) [Spanish] En la memoria se examinan los problemas planteados por el mantenimiento del circuito radiactivo de metal liquido del reactor de neutrones rapidos BR-5. Se tratan cuestiones relacionadas con la explotacion del reactor una vez alcanzado el grado de combustion de 2%, previsto en el proyecto y luego de producirse ciertas alteraciones de la densidad de determinados elementos combustibles. Se describen la experiencia adquirida durante la descarga del cuerpo del reactor, las investigaciones del estado general y de la hermeticidad de los elementos combustibles y las operaciones de descontaminacion de la instalacion y de las tuberias del circuito radiactivo primario despues de alcanzado un grado de combustion de 5%. (author) [Russian] V doklade rassmatrivayutsya voprosy proizvodstva

  2. The cone snails of Cape Verde: Marine endemism at a terrestrial scale

    Directory of Open Access Journals (Sweden)

    Howard Peters

    2016-07-01

    Full Text Available Cape Verde in the Eastern Atlantic is typical of many island groups in supporting a wealth of endemic species both terrestrial and marine. Marine gastropod molluscs of the genus Conus, commonly known as cone snails, occur in coastal tropical waters throughout the globe, but in Cape Verde their endemism reaches its apogee with 53 out of 56 species occurring nowhere else, the majority of which are restricted to single islands and frequently to single bays. However, Cape Verde is rapidly moving to a tourism-based economy with a projected boom in infrastructure development often coincidental with the shallow-water habitat of many range-restricted Conus. The conservation assessment of Conus to standards of the International Union for the Conservation of Nature (IUCN Red List of Endangered Species, found that 45.3% of 53 species assessed from Cape Verde are threatened or near-threatened with extinction compared to 7.4% of 579 species in the rest of the world. The only three Conus species globally assessed as Critically Endangered and on the cusp of extinction are all endemic to Cape Verde. Our analysis of Conus species distribution, together with spatial data of coastal protected areas and tourism development zones, identify important areas for future research and new marine protection. Our findings show that endemism with its associated risks for Conus in Cape Verde has worldwide parallels with many non-marine taxa, while our proposed strategy for Conus conservation extends beyond the confines of the country and this taxonomic group.

  3. Development of an interactive model of the Laguna Verde nuclear power plant based on the RELAP/SCDAP code; Desarrollo del modelo interactivo de la central nucleoelectrica de Laguna Verde basado en el codigo RELAP/SCDAP

    Energy Technology Data Exchange (ETDEWEB)

    Salazar C, J.H.; Ramos P, J.C.; Salazar S, E.; Chavez M, C. [LAIRN, FI-UNAM, DEPFI Campus Morelos, Jiutepec, Morelos (Mexico)]. e-mail: cchavez2@cableonline.com.mx

    2003-07-01

    The present work describes the development of an interactive model of the Nuclear power plant of Laguna Verde (CNLV) based on the RELAP/SCDAP nuclear code, and it incorporation to a classroom simulator. The functional prototype it allows to make evaluations for operational transients and postulates accidents, with capacitation purposes, training, analysis and design. It emphasizes on the methodology used to establish the inter activity. Such methodology, is based on a modular structure in the one that multiple processes can be executed in an independent way and where the generated information is stored in segments of shared memory (characteristic that allows the UNIX operating system) and sent to the different processes by means of communication routines developed in C programming language. The utility of the system is demonstrated by means of the use of interactive display graphics (mimic diagrams, pictorials and tendency graphics) for the simultaneous dynamic visualization of the variables more significant that involve to the pattern of a transitory event type (for example failure of the controller of feeding water in a BWR reactor). Near with the interactive module, it was developed a model of the reactor of the CNLV for the code of better estimation RELAP/SCDAP. Finally the evaluation of the model is described, where it is interpreted in general form the behavior of those main variables that describe the stationary state, corroborating that follow the same tendency that those reported in the FSAR (Final Safety Analysis Report) of the Laguna Verde plant. The obtained results allow to conclude that the made development was satisfactory and that it presents enormous advantages regarding the capacity and time of analysis when using tools of visualization in real time of execution. (Author)

  4. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13819-000] Verde Hydro, LLC... Intervene, and Competing Applications August 2, 2010. On July 21, 2010, Verde Hydro, LLC filed an... the feasibility of the Verde Hydroelectric Project, located in Maricopa County, in the State of...

  5. Irradiation effects on Zr-2.5Nb in power reactors

    Energy Technology Data Exchange (ETDEWEB)

    Song, C., E-mail: Carol.Song@cnl.ca [Canadian Nuclear Laboratories, Chalk River, Ontario (Canada)

    2016-06-15

    Zirconium alloys are widely used as structural materials in nuclear applications because of their attractive properties such as a low absorption cross-section for thermal neutrons, excellent corrosion resistance in water, and good mechanical properties at reactor operating temperatures. Zr-2.5Nb is one of the most commonly used zirconium alloys and has been used for pressure tube materials in CANDU (Canada Deuterium Uranium) and RBMK (Reaktor Bolshoy Moshchnosti Kanalnyy, 'High Power Channel-type Reactor') reactors for over 40 years. In a recent report from the Electric Power Research Institute, Zr-2.5Nb was identified as one of the candidate materials for use in normal structural applications in light-water reactors owing to its increased resistance to irradiation-induced degradation as compared with currently used materials. Historically, the largest program of in-reactor tests on zirconium alloys was performed by Atomic Energy of Canada Limited. Over many years of in-reactor testing and CANDU operating experience with Zr- 2.5Nb, extensive research has been conducted on the irradiation effects on its microstructures, mechanical properties, deformation behaviours, fracture toughness, delayed hydride cracking, and corrosion. Most of the results on Zr-2.5Nb obtained from CANDU experience could be used to predict the material performance under light water reactors. This paper reviews the irradiation effects on Zr-2.5Nb in power reactors (including heavy-water and light-water reactors) and summarizes the current state of knowledge. (author)

  6. Corredores verdes urbanos: estudo da viabilidade de conexão das áreas verdes de Vitória

    Directory of Open Access Journals (Sweden)

    Homero Marconi Penteado

    2007-12-01

    Full Text Available Grande parte dos profissionais de planejamento urbano tem buscado melhorar a qualidade de vida da população e a aplicação de princípios de sustentabilidade, que se refletem, na maioria dos casos, na busca de ampliação das áreas verdes, sejam na forma de parques, praças, arborização de vias ou mesmo incentivo aos jardins particulares. Esta pesquisa apresenta o resultado do estudo de viabilidade de criação de corredores verdes urbanos na cidade de Vitória, estabelecendo uma rede de conexões utilizando-se de sua malha viária, visando incrementar as condições ecológicas e paisagísticas urbanas e melhores condições de circulação de pedestres e ciclistas. Está alicerçada nos conceitos desenvolvidos pela ecologia da paisagem, baseada em fragmentos, corredores e matriz. A metodologia adotada foi aplicada em uma área teste, onde foram realizados levantamentos preliminares, mapeamento das áreas verdes, seleção de vias para implantação de corredores, avaliação dos possíveis corredores, inventário e análise das vias, diretrizes para estabelecimento dos corredores, ensaio projetual e criação de uma rede de corredores verdes. Dentre os principais resultados, verificou-se a possibilidade de criação de corredores com pequenas modificações nos perfis de vias que permitiriam a inserção de vegetação contínua, calçadas e ciclovias com consequências diretas (otimização das condições microclimáticas, melhoria na paisagem, atratividade para pequenos animais, incentivo ao percurso não motorizado, entre outros e indiretas (redução das partículas em suspensão, redução dos níveis de ruído e do consumo de combustíveis etc..

  7. Design of an equilibrium nucleus of a BWR type reactor based in a Thorium-Uranium fuel; Diseno de un nucleo de equilibrio de un reactor tipo BWR basado en un combustible de Torio-Uranio

    Energy Technology Data Exchange (ETDEWEB)

    Francois, J.L.; Nunez C, A. [Laboratorio de Analisis en Ingenieria de Reactores Nucleares, Facultad de Ingenieria-UNAM, Paseo Cuauhnahuac 8532, Jiutepec, Morelos (Mexico)

    2003-07-01

    In this work the design of the reactor nucleus of boiling water using fuel of thorium-uranium is presented. Starting from an integral concept based in a type cover-seed assemble is carried out the design of an equilibrium reload for the nucleus of a reactor like that of the Laguna Verde Central and its are analyzed some of the main design variables like the cycle length, the reload fraction, the burnt fuel, the vacuum distribution, the generation of lineal heat, the margin of shutdown, as well as a first estimation of the fuel cost. The results show that it is feasible to obtain an equilibrium reload, comparable to those that are carried out in the Laguna Verde reactors, with a good behavior of those analyzed variables. The cost of the equilibrium reload designed with the thorium-uranium fuel is approximately 2% high that the uranium reload producing the same energy. It is concluded that it is convenient to include burnable poisons, type gadolinium, in the fuel with the end of improving the reload design, the fuel costs and the margin of shutdown. (Author)

  8. Low concentrations of persistent organic pollutants (POPs) in air at Cape Verde.

    Science.gov (United States)

    Nøst, Therese Haugdahl; Halse, Anne Karine; Schlabach, Martin; Bäcklund, Are; Eckhardt, Sabine; Breivik, Knut

    2018-01-15

    Ambient air is a core medium for monitoring of persistent organic pollutants (POPs) under the Stockholm Convention and is used in studies of global transports of POPs and their atmospheric sources and source regions. Still, data based on active air sampling remain scarce in many regions. The primary objectives of this study were to (i) monitor concentrations of selected POPs in air outside West Africa, and (ii) to evaluate potential atmospheric processes and source regions affecting measured concentrations. For this purpose, an active high-volume air sampler was installed on the Cape Verde Atmospheric Observatory at Cape Verde outside the coast of West Africa. Sampling commenced in May 2012 and 43 samples (24h sampling) were collected until June 2013. The samples were analyzed for selected polychlorinated biphenyls (PCBs), polybrominated diphenyl ethers (PBDEs), hexachlorobenzene (HCB) and chlordanes. The concentrations of these POPs at Cape Verde were generally low and comparable to remote sites in the Arctic for several compounds. Seasonal trends varied between compounds and concentrations exhibited strong temperature dependence for chlordanes. Our results indicate net volatilization from the Atlantic Ocean north of Cape Verde as sources of these POPs. Air mass back trajectories demonstrated that air masses measured at Cape Verde were generally transported from the Atlantic Ocean or the North African continent. Overall, the low concentrations in air at Cape Verde were likely explained by absence of major emissions in areas from which the air masses originated combined with depletion during long-range atmospheric transport due to enhanced degradation under tropical conditions (high temperatures and concentrations of hydroxyl radicals). Copyright © 2017 The Author(s). Published by Elsevier B.V. All rights reserved.

  9. Strategic Analysis for the MER Cape Verde Approach

    Science.gov (United States)

    Gaines, Daniel; Belluta, Paolo; Herman, Jennifer; Hwang, Pauline; Mukai, Ryan; Porter, Dan; Jones, Byron; Wood, Eric; Grotzinger, John; Edgar, Lauren; hide

    2009-01-01

    The Mars Exploration Rover Opportunity has recently completed a two year campaign studying Victoria Crater. The campaign culminated in a close approach of Cape Verde in order to acquire high resolution imagery of the exposed stratigraphy in the cliff face. The close approach to Cape Verde provided significant challenges for every subsystem of the rover as the rover needed to traverse difficult, uncharacterised terrain and approach a cliff face with the potential of blocking out solar energy and communications with Earth. In this paper we describe the strategic analyses performed by the science and engineering teams so that we could successfully achieve the science objectives while keeping the rover safe.

  10. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Science.gov (United States)

    2012-03-08

    ... Southern Railroad, LLC--Operation Exemption--Rail Line of Verde Logistics Railroad, LLC at Santa Teresa... notice of exemption under 49 CFR 1150.31 to operate approximately 12,000 feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point of connection with Union Pacific...

  11. Developing and modeling of the 'Laguna Verde' BWR CRDA benchmark

    International Nuclear Information System (INIS)

    Solis-Rodarte, J.; Fu, H.; Ivanov, K.N.; Matsui, Y.; Hotta, A.

    2002-01-01

    Reactivity initiated accidents (RIA) and design basis transients are one of the most important aspects related to nuclear power reactor safety. These events are re-evaluated whenever core alterations (modifications) are made as part of the nuclear safety analysis performed to a new design. These modifications usually include, but are not limited to, power upgrades, longer cycles, new fuel assembly and control rod designs, etc. The results obtained are compared with pre-established bounding analysis values to see if the new core design fulfills the requirements of safety constraints imposed on the design. The control rod drop accident (CRDA) is the design basis transient for the reactivity events of BWR technology. The CRDA is a very localized event depending on the control rod insertion position and the fuel assemblies surrounding the control rod falling from the core. A numerical benchmark was developed based on the CRDA RIA design basis accident to further asses the performance of coupled 3D neutron kinetics/thermal-hydraulics codes. The CRDA in a BWR is a mostly neutronic driven event. This benchmark is based on a real operating nuclear power plant - unit 1 of the Laguna Verde (LV1) nuclear power plant (NPP). The definition of the benchmark is presented briefly together with the benchmark specifications. Some of the cross-sections were modified in order to make the maximum control rod worth greater than one dollar. The transient is initiated at steady-state by dropping the control rod with maximum worth at full speed. The 'Laguna Verde' (LV1) BWR CRDA transient benchmark is calculated using two coupled codes: TRAC-BF1/NEM and TRAC-BF1/ENTREE. Neutron kinetics and thermal hydraulics models were developed for both codes. Comparison of the obtained results is presented along with some discussion of the sensitivity of results to some modeling assumptions

  12. Verde Macael: A Serpentinite Wrongly Referred to as a Marble

    OpenAIRE

    Navarro, Rafael; Pereira, Dolores; Gimeno, Ana; Barrio, Santiago

    2013-01-01

    Serpentinites are used in both exterior and interior locations, but not all serpentinites are equal: they vary in physical-mechanical behavior and are not all suitable for similar uses. The serpentinites most commonly used worldwide come from India, Pakistan or Egypt. Spain has traditionally quarried two ultramafic massifs, one in Galicia (Verde Pirineos) and one in Andalucía (Verde Macael). Some of these quarries were small family-run businesses. In both cases, these rocks are commercially a...

  13. Winter sound-level characterization of the Deaf Smith County location in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1984-03-01

    A description of sound levels and sound sources in the Deaf Smith County location in the Palo Duro Basin during a period representative of the winter season is presented. Data were collected during the period February 26 through March 1, 1983. 4 references, 1 figure, 3 tables

  14. Investigation of the suspected presence of solid hydrocarbon in bedded salt samples from the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1985-10-01

    This report contains laboratory test results for two bedded salt samples from the Grabbe No. 1 (PD-2) Well of the Palo Duro Basin, Texas. This study was commissioned to determine whether or not solid hydrocarbons exist in bedded salt samples in the Palo Duro Basin. Laboratory investigations include electron microprobe examinations on polished thin sections and optical examinations and chemical tests on insoluble residues of the salt samples. No direct evidence was found that identifiable solid hydrocarbons are present in either sample of the bedded salt core. The total carbon content of the two salt samples was measured yielding 0.016 and 0.022 weight percent carbon. Detailed microscopic analyses showed that the carbon in the samples was associated with calcite, clays, and the epoxy resin used in sample preparation

  15. El deslizamiento de Palo Alto, Turrialba, Costa Rica : apuntes para su estudio

    Directory of Open Access Journals (Sweden)

    Peraldo Huertas, Giovanni

    2015-12-01

    Full Text Available En este trabajo se busca caracterizar, desde un punto de vista geomorfológico y geológico, el deslizamiento de Palo Alto, en el contexto de los megaprocesos de inestabilidad de laderas presentes en las laderas del río Reventazón. El corredor del río Reventazón, entre Turrialba y Siquirres, muestra una serie de procesos complejos de remoción en masa, que generan morfologías típicas de procesos de deslizamiento, tan continuas que dan una apariencia morfológica caótica, donde es difícil definir patrones de movimiento del terreno. El área de inestabilidad de Palo Alto se reconoce fácilmente incluso en el mapa topográfico correspondiente a escala 1:50 000, pues muestra una típica forma en herradura. Los límites del deslizamiento están bien marcados mediante escarpes bien definidos en campo, pero los extremos de las coronas laterales hacia el oeste se desdibujan debido, entre otras cosas, a que en esos sectores queda indefinido el límite al norte con el área de inestabilidad compleja de Bonilla y al sur con el área similar de Guayabo - Lajas. Se efectuó una fotointerpretación del área de estudio, mediante la revisión de fotos aéreas de la línea de vuelo Orosi-Pejibaye, escala 1:20 000 del año 1988, así como fotografías aéreas del proyecto Terra 1998, con el fin de observar posibles cambios en los procesos erosivos, así como en la forma del deslizamiento. Posteriormente, se realizó trabajo de campo para revisar la morfología fotointerpretada, analizar la conformación geológica a nivel de litología y estructura y así afinar la interpretación final de la geomorfología del área inestable de Palo Alto. Desde un punto de vista geológico, el área de estudio está compuesta por rocas sedimentarias del Neógeno, tales como la Fm. Uscari (Mioceno y las formaciones Suretka y Fm. Doán (Plioceno; además de aglomerados que posiblemente se relacionan al volcanismo holoceno de la cordillera volcánica Central. Mediante an

  16. Temporary storage in dry of the spent nuclear fuel in the Nuclear Power Plant of Laguna Verde; Almacenamiento temporal en seco del combustible nuclear gastado en la Central Nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez M, N.; Vargas A, A., E-mail: natividad.hernandez@cfe.gob.mx [Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Carretera Veracruz-Medellin Km. 7.5, 94270 Dos Bocas, Veracruz (Mexico)

    2013-10-15

    To guarantee the continuity in the operation of the two nuclear reactors of the nuclear power plant of Laguna Verde (NPP-L V) is an activity of high priority of the Comision Federal de Electricidad (CFE) in Mexico. At the present time, the CFE is working in the storage project in dry of the spent fuel with the purpose of to liberate space of the pools and to have the enlarged capacity of storage of the spent fuel that is discharged of the reactors. This work presents the storage option in dry of the spent fuel, considering that the original capacity of the spent fuel pools of the NPP-L V was of 1242 spaces each one and that in 1991, through a modification of the original design, the storage capacity was increased to 3177 spaces by pool. At present, the cells occupied by unit are of 2165 (68%) for the Unit-I and 1839 (58%) for the Unit-2, however, in 2017 and 2022 the capacity to discharge the complete core will be limited by what is required of a retirement option of spent fuel assemblies to liberate spaces. (author)

  17. Agrochemical characterization of vermicomposts produced from residues of Palo Santo (Bursera graveolens) essential oil extraction.

    Science.gov (United States)

    Carrión-Paladines, Vinicio; Fries, Andreas; Gómez-Muñoz, Beatriz; García-Ruiz, Roberto

    2016-12-01

    Fruits of Palo Santo (Bursera graveolens) are used for essential oil extraction. The extraction process is very efficient, because up to 3% of the fresh fruits can be transformed into essential oil; however, a considerable amount of waste is concurrently produced (>97% of the fresh biomass). Recent developments in Ecuadorian policies to foster environmentally friendly agroforestry and industrial practices have led to widespread interest in reusing the waste. This study evaluated the application of four vermicomposts (VMs), which are produced from the waste of the Palo Santo fruit distillation in combination with other raw materials (kitchen leftovers, pig manure, goat manure, and King Grass), for agrochemical use and for carbon (C) and nitrogen (N) decomposition in two soils with different textures. The results showed that the vermicompost mixtures (VMM) were valuable for agricultural utilisation, because total N (min. 2.63%) was relatively high and the C/N ratio (max. 13.3), as well as the lignin (max. 3.8%) and polyphenol (max. 1.6%) contents were low. In addition, N availability increased for both soil types after the application of the VMM. In contrast, N became immobile during decomposition if the VM of the pure waste was added. This likely occurred because of the relatively low total N (1.16%) content and high C/N ratio (35.0). However, the comparatively low C decomposition of this VM type makes its application highly recommendable as a strategy to increase the levels of organic matter and C, as well as for soil reclamation. Overall, these results suggest that the residues of the Palo Santo essential oil extraction are a potential source for vermicompost production and sustainable agriculture. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. PRODUCCIÓN Y CALIDAD FISICOQUÍMICA DE LECHE DE CABRAS SUPLEMENTADAS CON FORRAJE VERDE HIDROPÓNICO DE MAÍZ

    Directory of Open Access Journals (Sweden)

    Mario Garc\\u00EDa-Carrillo

    2013-01-01

    Full Text Available El objetivo del presente trabajo fue evaluar la producción y calidad fisicoquímica de leche de cabras al ser suplementadas con dietas que contenían forraje verde hidropónico de maíz. Este estudio se desarrolló en la Comarca Lagunera de Coahuila, México durante los meses de marzo a agosto de 2011. Para la dieta 1 se empleó una relación 85:15 (base seca de alfalfa henificada y forraje verde hidropónico (AH: FVH. La dieta 2 se formuló con una relación 70:30 de AH y FVH, mientras que la dieta testigo tuvo una relación 87.5:12.5 de alfalfa henificada y vaina de mezquite. Se utilizó un diseño en triple cuadro latino. La producción y calidad de leche fueron mayores al suministrar la dieta compuesta con alfalfa henificada y forraje verde hidropónico de maíz al 30%.

  19. Cape Verde. A Country Guide Series Report from the AACRAO-AID Project.

    Science.gov (United States)

    Sevigny, Joseph A.

    This report provides information on the education system of Cape Verde, and is designed to assist college admissions officers and registrars in the United States with the admission and placement of students from that country. The report contains general information on the geography, history, and people of Cape Verde, as well as more specific…

  20. The continuous improvement system of nuclear power plant of Laguna Verde; El sistema de mejora continua de la central nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km. 42.5 Cardel-Nautla, Veracruz (Mexico)], e-mail: arr99999@cfe.gob.mx

    2009-10-15

    This paper describes the continuous improvement system of nuclear power plant of Laguna Verde and the achievements in implementing the same and additionally two study cases are presents. In February 2009 is noteworthy because the World Association of Nuclear Operators we identified as a learning organization, qualification which shows that the continuous improvement system has matured, and this system will expose as I get to learn to capitalize on our own experiences and external experiences diffused by the nuclear industry. In 2007 the management of nuclear power plants integrates its improvement systems and calls it continuous improvement system and is presented in the same extensive report that won the National Quality Award. This system is made up of 5 subsystems operating individually and are also related 1) human performance; 2) referential comparison or benchmarking; 3) self-assessment; 4) corrective action and 5) external operating experience. Five subsystems that plan, generate, capture, manage, communicate and protect the knowledge generated during the processes execution of nuclear power plant of Laguna Verde, as well as from external sources. The target set in 2007 was to increase the intellectual capital to always give response to meeting the security requirements, but creating a higher value to quality, customer, environment protection and society. In brief each of them, highlighting the objective, expectations management, implementation and some benefits. At the end they will describe two study cases selected to illustrate these cases as the organization learns by their continuous improvement system. (Author)

  1. Design of an equilibrium nucleus of a BWR type reactor based in a Thorium-Uranium fuel

    International Nuclear Information System (INIS)

    Francois, J.L.; Nunez C, A.

    2003-01-01

    In this work the design of the reactor nucleus of boiling water using fuel of thorium-uranium is presented. Starting from an integral concept based in a type cover-seed assemble is carried out the design of an equilibrium reload for the nucleus of a reactor like that of the Laguna Verde Central and its are analyzed some of the main design variables like the cycle length, the reload fraction, the burnt fuel, the vacuum distribution, the generation of lineal heat, the margin of shutdown, as well as a first estimation of the fuel cost. The results show that it is feasible to obtain an equilibrium reload, comparable to those that are carried out in the Laguna Verde reactors, with a good behavior of those analyzed variables. The cost of the equilibrium reload designed with the thorium-uranium fuel is approximately 2% high that the uranium reload producing the same energy. It is concluded that it is convenient to include burnable poisons, type gadolinium, in the fuel with the end of improving the reload design, the fuel costs and the margin of shutdown. (Author)

  2. The Interactive Dimension of Communication: The Pragmatics of the Palo Alto Group

    OpenAIRE

    Codruţa Porcar; Cristian Hainic

    2011-01-01

    Our paper proposes to analyze from a semiotic perspective the process of communication as conceived within the Palo Alto Group. We will firstly show that, as a result of the Group's critiques and revisions of the linear or mechanistic theories of communication, new perspectives are brought about for the essential axes of transformation within communication: we do not communicate as from a distinct atom to another, through an isolated channel, but through parts which are equal to the whole, th...

  3. GRIP BARBADOS/CAPE VERDE RADIOSONDE V1

    Data.gov (United States)

    National Aeronautics and Space Administration — The GRIP Barbados/Cape Verde radiosonde data set consists of generally two soundings per day (06Z and 12Z) launched from Barbados, and one sounding per day (12Z)...

  4. DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-09-01

    Palo Duro uses advanced framing techniques like 2x6 24-inch on-center framing, open headers above windows on non-load-bearing walls, 2-stud corners, ladder blocking where walls intersect, and single top and bottom plates. These techniques reduce the amount of lumber in the wall, allowing more room for insulation and reducing costs and installation time. The builder garnered a 2013 Housing Innovation Award in the production builder category.

  5. Dissolution of the Upper Seven Rivers and Salado salt in the interior Palo Duro Basin, Texas: Revision: Topical report

    International Nuclear Information System (INIS)

    DeConto, R.T.; Murphy, P.J.

    1987-09-01

    The Upper Seven Rivers and Salado Formations contain the uppermost salts within the interior Palo Duro Basin, Stratigraphic and structural evidence based on geophysical well logs indicate that both dissolution and facies change have influenced the thickness of these uppermost salts. The magnitude of vertical salt loss due to dissolution is interminable at this time because original salt thickness is unknown. Gradual thinning of the Upper Seven Rivers Formation is recognized from south to north across the Palo Duro Basin. Anhydrites within the formation pinch out toward the basin margins, indicating that section loss is in part depositionally controlled. Additionally, informal subdivision of the Upper Seven Rivers Formation suggests that salt dissolution has occurred in the uppermost salt. A northeast-trending zone of thin Upper Seven Rivers Formation in portions of Deaf Smith, Randall, Castro, and Parmer Counties is possibly related to Tertiary dissolution. In New Mexico, local thinning of the Upper Seven Rivers Formation may be associated with faulting. Triassic erosion on uplifted fault blocks has affected the Upper Permian section. The Salado salt margin is located within the interior Palo Duro Basin. Geophysical well logs and core evidence indicate that the salt margin has migrated basinward as a result of dissolution. Permian dissolution probably contributed to some salt loss. 106 refs., 31 figs., 2 tabs

  6. National autonomous university of Mexico RELAP/SCDAPSIM-based plant simulation and training applications to the Laguna Verde NPP

    International Nuclear Information System (INIS)

    Chavez-Mercado, C.; Hohorst, J.K.; Allison, C.M.

    2004-01-01

    The RELAP/SCDAPSIM code, designed to predict the behavior of reactor systems during normal and accident conditions, is being developed by Innovative Systems Software as part of the International SCDAP Development and Training Program (SDTP). This code is being used as the simulator engine for the National Autonomous University of Mexico's Simulation and Training Facility located at the Campus Morelos in Jiutepec, Mexico. This paper describes the RELAP/SCDAPSIM code, the Simulation and Training facility at the National Autonomous University of Mexico, and the application of the training system to the Laguna Verde Nuclear Power Plant located in the Mexican state of Veracruz. (author)

  7. Development of a methodology for the economical analysis of fuel cycles, application to the Laguna Verde central

    International Nuclear Information System (INIS)

    Malfavon, S.M.; Trejo, M.G.; Hernandez, H.; Francois, J.L.; Ortega, R.F.

    2003-01-01

    In this work a methodology developed to carry out the economical analysis of the fuel cycle of a nuclear reactor is presented. The methodology was applied to the Laguna Verde Nuclear Power Station (CNLV). The design of the reload scenarios of the CNLV are made with the Core Master Presto code (CM-Presto), three-dimensional simulator of the reactor core, the launched data by this, as well as the information of the Energy use plan (PUE), it allowed us to obtain reliable results through the fitness of an algorithm of economic calculation that considers all the components of the fuel cycle to present worth. With the application of the methodology it was obtained the generated energy, as well as their respective cost of each sub lot type of assemblies by operation cycle, from the start-up of the CNLV until September 13, 2002. Using the present worth method its were moved all the values at November 5, 1988, date of operation beginning. To the final of the analysis an even cost of 6.188 mills/kWh was obtained for those first 9 cycles of the Unit 1 of the CNLV, being observed that the costs of those first 3 operation cycles are the more elevated. Considering only the values starting from the cycle 4, the levelled cost turns out to be of 5.96 mills/kWh. It was also obtained the cost by fuel lot to evaluate the performance of assemble with the same physical composition. (Author)

  8. O chá verde e suas ações como quimioprotetor

    Directory of Open Access Journals (Sweden)

    Wanderlei Schmitz

    2005-12-01

    Full Text Available O chá preto é responsável por 75% do chá consumido no mundo e o chá verde, por apenas 22%. O chá que era consumido como medicamento, passou a ser do gosto popular devido as suas característica organolépticas. Seus componentes flavonóides e catequinas apresentam uma série de atividades biológicas, antioxidante, quimioprotetora, antiinflamatória e anticarcinogênica. Vários estudos vêm sendo desenvolvidos por pesquisadores em varias regiões do mundo para comprovar estas atividades terapêuticas, objetivando compreender os mecanismos de ação do chá verde. Diante do acima citado, esta revisão tem por finalidade apresentar as varias linhas de pesquisa em andamento e os resultados já obtidos sobre o efeito quimioprotetor/antioxidante do chá verde.

  9. Atividade das glicosidases na presença de chá verde e de chá preto

    OpenAIRE

    Pereira,L.L.S.; Souza,S.P.; Silva,M.C; Carvalho,G.A.; Santos,C.D.; Corrêa,A.D.; Abreu,C.M.P.

    2010-01-01

    Várias plantas têm sido consideradas produtos terapêuticos, dentre elas destacam-se os chás verde e preto, popularmente utilizados para controle da hiperglicemia e obesidade. Objetivou-se neste trabalho avaliar o potencial inibitório sobre as enzimas α-amilase, α e β-glicosidases e o teor de compostos fenólicos do chá verde e do chá preto. O teor de compostos fenólicos encontrados foram de 80,8 ± 0,43 mg g-1 no chá preto e 32,0 ± 0,12 mg g-1 no chá verde. O chá verde e o chá pr...

  10. Validation of a new software version for monitoring of the core of the Unit 2 of the Laguna Verde power plant with ARTS

    International Nuclear Information System (INIS)

    Calleros, G.; Riestra, M.; Ibanez, C.; Lopez, X.; Vargas, A.; Mendez, A.; Gomez, R.

    2005-01-01

    In this work it is intended a methodology to validate a new version of the software used for monitoring the reactor core, which requires of the evaluation of the thermal limits settled down in the Operation Technical Specifications, for the Unit 2 of Laguna Verde with ARTS (improvements to the APRMs, Rod Block Monitor and Technical specifications). According to the proposed methodology, those are shown differences found in the thermal limits determined with the new versions and previous of the core monitoring software. Author)

  11. Using NJOY99 and MCNP4B2 to Estimate the Radiation Damage Displacements per Atom per Second in Steel Within the Boiling Water Reactor Core Shroud and Vessel Wall from Reactor-Grade Mixed-Oxide/Uranium Oxide Fuel for the Nuclear Power Plant at Laguna Verde, Veracruz, Mexico

    International Nuclear Information System (INIS)

    Vickers, Lisa

    2003-01-01

    The government of Mexico has expressed interest in utilizing the Laguna Verde boiling water reactor (BWR) nuclear power plant for the disposition of reprocessed spent uranium oxide (UOX) fuel in the form of reactor-grade mixed-oxide (MOX) fuel. MOX fuel would replace spent UOX fuel as a fraction in the core from 18 to 30% depending on the fuel loading cycle. MOX fuel is expected to increase the neutron fluence, flux, fuel centerline temperature, reactor core pressure, and yield higher energy neutrons.There is concern that a core with a fraction of MOX fuel (i.e., increased 239 Pu wt%) would increase the radiation damage displacements per atom per second (dpa-s -1 ) in steel within the core shroud and vessel wall as compared to only conventional, enriched UOX fuel in the core. The evaluation of radiation damage within the core shroud and vessel wall is a concern because of the potentially adverse affect to personnel and public safety, environment, and operating life of the reactor.The primary uniqueness of this paper is the computation of radiation damage (dpa-s -1 ) using NJOY99-processed cross sections for steel within the core shroud and vessel wall. Specifically, the unique radiation damage results are several orders of magnitude greater than results of previous works. In addition, the conclusion of this paper was that the addition of the maximum fraction of one-third MOX fuel to the LV1 BWR core did significantly increase the radiation damage in steel within the core shroud and vessel wall such that without mitigation of radiation damage by periodic thermal annealing or reduction in operating parameters such as neutron fluence, core temperature, and pressure, it posed a potentially adverse affect to the personnel and public safety, environment, and operating life of the reactor

  12. Simulation of the aspersion system of the core low pressure (LPCS) for a boiling water reactor (BWR) based on RELAP; Simulacion del sistema de aspersion del nucleo a baja presion (LPCS) para un reactor de agua en ebullicion (BWR) basado en RELAP

    Energy Technology Data Exchange (ETDEWEB)

    Membrillo G, O. E.; Chavez M, C., E-mail: garzo1012@gmail.com [UNAM, Facultad de Ingenieria, Circuito Interior, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2012-10-15

    The present work presents the modeling and simulation of the aspersion system to low pressure of reactor of the nuclear power plant of Laguna Verde using the nuclear code RELAP/SCDAP. The objective of the emergency systems inside a nuclear reactor is the cooling of the core, nor caring the performance of any other emergency system in the case of an accident design base for coolant loss. To obtain a simulation of the system is necessary to have a model based on their main components, pipes, pumps, valves, etc. This article describes the model for the simulation of the main line and the test line for the HPCS. At the moment we have the simulation of the reactor vessel and their systems associated to the nuclear power plant of Laguna Verde, this work will allow to associate the emergency system model LPCS to the vessel model. The simulation of the vessel and the emergency systems will allow knowing the behavior of the reactor in the stage of the coolant loos, giving the possibility to analyze diverse scenarios. The general model will provide an auxiliary tool for the training in classroom and at distance in the operation of nuclear power plants. (Author)

  13. Technical Specifications: Palo Verde Nuclear Generating Station, Unit No. 1 (Docket No. 50-528). Appendix ''A'' to License No. NPF-41

    International Nuclear Information System (INIS)

    1985-05-01

    Information on the limiting conditions for operation is presented concerning reactivity control systems, power distribution limits, instrumentation, reactor coolant system, emergency core cooling system, containment systems, plant systems, electrical power systems, refueling operations, special test exceptions, radioactive effluents, and radiological environmental monitoring

  14. Stability analysis of a recycling circuit of a BWR type reactor. Theoretical study; Analisis de estabilidad de un circuito de recirculacion de un reactor del tipo BWR. Estudio teorico

    Energy Technology Data Exchange (ETDEWEB)

    Salinas H, J.G.; Espinosa P, G. [Universidad Autonoma Metropolitana-Iztapalapa, 09000 Mexico D.F. (Mexico); Gonzalez M, V.M. [Comision Nacional de Seguridad Nuclear y Salvaguardias, 04000 Mexico D.F. (Mexico)

    2000-07-01

    The Technology, Regulation and Services Management of the National Commission of Nuclear Safety and Safeguards financed and in coordinate form with the I.P.H. Department of the Metropolitan Autonomous-Iztapalapa University developed the present project with the purpose of studying the effect of the recycling system on the linear stability of a BWR reactor whose reference central is the Laguna Verde power station. The present project forms part of a work series focused to the linear stability of the nuclear reactor of the Unit 1 at Laguna Verde power station. The components of the recycling system considered for the study of stability are the recycling external circuit (recycling pumps, valves) and the internal circuit (downcomer, jet pumps, lower full, driers, separators). The mathematical model is obtained applying mass balances and movement quantity in each one of the mentioned circuits. With respect to the nucleus model two regions are considered, the first one is made of a flow in one phase and the second one of a flow in two phases. For modelling the biphasic region it is considered homogenous flow. Generally it is studied the system behavior in the frequency domain starting from the transfer function applied to four operational states which correspond to the lower stability zone in the map power-flow of the Unit 1 of Laguna Verde power station. The Nyquist diagrams corresponding to each state as well as their characteristic frequency were determined. The results show that exists a very clear dependence of the power-flow relation on the stability of the system. It was found that the boiling length is an important parameter for the linear stability of the system. The obtained results show that the characteristic frequencies in unstability zones are similar to the reported data of the Unit 1 of the Laguna Verde power station in the event of power oscillations carried out in January 1995. (Author)

  15. Agrochemical characterization of vermicomposts produced from residues of Palo Santo (Bursera graveolens) essential oil extraction

    DEFF Research Database (Denmark)

    Carrión-Paladines, Vinicio; Fries, Andreas; Gomez Muñoz, Beatriz

    2016-01-01

    Fruits of Palo Santo (Bursera graveolens) are used for essential oil extraction. The extraction process is very efficient, because up to 3% of the fresh fruits can be transformed into essential oil; however, a considerable amount of waste is concurrently produced (>97% of the fresh biomass). Rece...

  16. Characterization of Mesa Verde Black-on-white ceramics from southwestern Colorado using NAA

    Energy Technology Data Exchange (ETDEWEB)

    Glowacki, D M; Neff, H; Glascock, M D [Missouri Univ., Columbia, MO (United States). Research Reactor Facility

    1995-10-01

    Sixty Mesa Verde variety Black-on-white bowls from Castle Rock Pueblo (5MT 1825) and Sand Canyon Pueblo (5MT765) in southwestern Colorado were chemically characterized using neutron activation analysis. Eleven clay sources local to the sites in the McElmo Drainage area were also analyzed. The results revealed two distinct compositional groups containing relative frequencies that imply local production. The occurrence of trade between the two sites was also identified. (author). 20 refs., 5 figs., 2 tabs.

  17. Secuencia didáctica en química verde

    OpenAIRE

    Cortés Rodríguez, Adriana Janneth

    2017-01-01

    Esta propuesta presenta los resultados del diseño e implementación de una secuencia didáctica cuya finalidad es adaptar los principios de la Química Verde (QV) en el ámbito escolar, a través de actividades específicas que se enmarcan dentro del diseño del Protocolo Verde o Practica Amigable para el Medio Ambiente. La metodología de investigación – acción desarrollada permitió la reflexión de los estudiantes sobre los principios de la QV en relación con la identificación del cambio de color, e...

  18. Effects of past and future groundwater development on the hydrologic system of Verde Valley, Arizona

    Science.gov (United States)

    Garner, Bradley D.; Pool, D.R.

    2013-01-01

    Communities in central Arizona’s Verde Valley must manage limited water supplies in the face of rapidly growing populations. Developing groundwater resources to meet human needs has raised questions about the effects of groundwater withdrawals by pumping on the area’s rivers and streams, particularly the Verde River. U.S. Geological Survey hydrologists used a regional groundwater flow model to simulate the effects of groundwater pumping on streamflow in the Verde River. The study found that streamflow in the Verde River between 1910 and 2005 had been reduced as the result of streamflow depletion by groundwater pumping, also known as capture. Additionally, using three hypothetical scenarios for a period from 2005 to 2110, the study’s findings suggest that streamflow reductions will continue and may increase in the future.

  19. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  20. Mantacaprella macaronensis, a new genus and species of Caprellidae (Crustacea: Amphipoda) from Canary Islands and Cape Verde.

    Science.gov (United States)

    Maite, Vázquez-Luis; José M, Guerra-García; Susana, Carvalho; Lydia Png-Gonzalez

    2013-01-01

    Mantacaprella macaronensis new genus, new species, is described based on specimens collected from Canary Islands and Cape Verde. Mantacaprella is close to the genera Parambus, Pseudolirius, Propodalirius and Paracaprella, but can be distinguished by the combination of the following characteristics: pereopods 3, 4 and 5 two-articulate; pereopods 6 and 7 six-articulate; mandibular molar present and palp absent; male abdomen with a pair of well-developed appendages. The new species has been found living in Cymodocea nodosa meadows and Caulerpa prolifera beds from 8.8 to 14.6 m depth in Gran Canaria (Canary Islands), and in natural rocky and artificial habitats (shipwrecks) at 25 m in Sal Island (Cape Verde). Even though the new species is one of the dominant amphipods inhabiting meadows of Cymodocea nodosa in Gran Canaria and in Cape Verde, it had not been described so far. This reflects the lack of knowledge on Macaronesian invertebrates, such as amphipods, and the need of further taxonomical studies to better characterise the whole biodiversity of this region and to design adequate programmes of management and conservation.

  1. Neutrino oscillations on the way to long-baseline experiments

    CERN Document Server

    Ryabov, V A

    2003-01-01

    The motivations and physical objectives of experiments in the search for nu /sub mu / to nu /sub e/, nu /sub tau / oscillations in long- baseline accelerator neutrino beams are reviewed. Neutrino beams, detectors, and methods for detecting oscillations (detection of the disappearance of nu /sub mu /, and the appearance of nu /sub e/ and nu /sub tau /) in the current K2K (KEK to Super Kamiokande) experiment and in the MINOS (FNAL to Soudan) and OPERA (CERN to Gran Sasso) near-future experiments are discussed. Possibilities of measuring the oscillation parameters in these experiments are considered in connection with new data obtained in CHOOZ and Palo Verde reactor experiments, the solar neutrino deficit and nu /sub mu // nu /sub e/ anomaly of atmospheric neutrinos, which are observed in large-scale underground detectors, and the excess of nu /sub e/ events in the LSND experiment. Neutrino-oscillation scenarios used in models with three and four (including sterile) types of neutrino, as well as the possibility...

  2. Surface hydrologic characteristics of proposed repository locations in the Palo Duro Basin of the Texas Panhandle

    International Nuclear Information System (INIS)

    1985-04-01

    This report provides a description of the surface hydrology in the two proposed locations of a high-level waste repository within the Palo Duro Basin of the Texas Panhandle. Included for consideration are the topography; the major drainage systems - Palo Duro, Tierra Blanca, and Tule Creeks, and Prairie Dog Town Fork of the Red River; and the most prominent impoundments, the playa lakes. The magnitude and frequency of precipitation throughout the region are discussed, and rainfall depth-duration-area data for the 100-year, 500-year, and probable maximum storms are presented. Soil properties are also described, with specific reference to the infiltration and runoff processes and the contribution of these processes to Ogallala aquifer recharge. A summary discussion of the local streams includes information on historical streamflow, a brief description of flooding, and results of a study of floodplains for the 100-year, 500-year, and probable maximum storms. The report concludes with a characterization of the water quality of these streams and an explanation of the local geologic influences on stream-water chemistry. 25 figures, 20 tables

  3. Groundwater resources of Mosteiros basin, island of Fogo, Cape Verde, West Africa

    Science.gov (United States)

    Heilweil, Victor M.; Gingerich, Stephen B.; Plummer, Niel; Verstraeten, Ingrid M.

    2010-01-01

    Groundwater resources in Cape Verde provide water for agriculture, industry, and human consumption. These resources are limited and susceptible to contamination. Additional groundwater resources are needed for continued agricultural development, particularly during times of drought, but increased use and (or) climatic change may have adverse effects on the quantity and quality of freshwater available. In volcanic island aquifers such as those of Cape Verde, a lens of fresh groundwater typically ?floats? upon a layer of brackish water at the freshwater/saltwater boundary, and increased pumping may cause salt water intrusion or other contamination. A recent U.S. Geological Survey study assessed baseline groundwater conditions in watersheds on three islands of Cape Verde to provide the scientific basis for sustainably developing water resources and minimizing future groundwater depletion and contamination.

  4. New species of mayflies (Ephemeroptera) from Cape Verde

    Czech Academy of Sciences Publication Activity Database

    Soldán, Tomáš; Bojková, J.

    2015-01-01

    Roč. 3926, č. 4 (2015), s. 561-575 ISSN 1175-5326 Institutional support: RVO:60077344 Keywords : Cape Verde * Macaronesia * West Africa Subject RIV: EH - Ecology, Behaviour Impact factor: 0.994, year: 2015

  5. Actinides inventory of the nuclear power plant of Laguna Verde Unit 1

    International Nuclear Information System (INIS)

    Martinez C, E.; Ramirez S, J. R.; Alonso V, G.

    2013-10-01

    At the present time 435 nuclear power reactors exist for the electricity generation operating in the world and 63 in construction. Mexico has two reactors type BWR in the nuclear power plant of Laguna Verde. The nuclear fuel that is used in the nuclear reactors is retired of the reactor core when the energy that this contained has been extracted. This used fuel is known as spent nuclear fuel, the problem with this fuel is that was irradiated inside the reactor and continuous emitting a high radiation, as well as a significant heat quantity when being extracted, for what is necessary to maintain it in cooling and with some shielding to be protected of the radiation that emits. This objective is achieved confining the fuel in the spent nuclear fuel pool, where it is cooled and the same pool provides the necessary shielding to maintain the surroundings in safety radiation levels for the personnel that work in the power plant. An inconvenience of the pools is its limited storage capacity and that after certain time is necessary to remove the fuel, according to the established regulation to continue operating. To correct this inconvenience, two alternatives of spent fuel disposition exist, 1) the final disposition in deep geologic repositories and 2) the reprocessing and recycled of spent fuel. Each alternative presents its particularities and specific problems; however taking many years to be able to implement anyone of them. To carry out the second option, is indispensable to estimate the total mass of actinides generated in the spent nuclear fuel, that which represents to develop a methodology for it, this action is the main purpose of the present work. Inside our calculation method was necessary to appeal to diverse computation tools as the codes Origin-S and Keno V.a. Later on the obtained were compared with a problem type Benchmark, being obtained a smaller absolute error to 1.0%. (Author)

  6. Stability analysis of a recycling circuit of a BWR type reactor. Theoretical study

    International Nuclear Information System (INIS)

    Salinas H, J.G.; Espinosa P, G.; Gonzalez M, V.M.

    2000-01-01

    The Technology, Regulation and Services Management of the National Commission of Nuclear Safety and Safeguards financed and in coordinate form with the I.P.H. Department of the Metropolitan Autonomous-Iztapalapa University developed the present project with the purpose of studying the effect of the recycling system on the linear stability of a BWR reactor whose reference central is the Laguna Verde power station. The present project forms part of a work series focused to the linear stability of the nuclear reactor of the Unit 1 at Laguna Verde power station. The components of the recycling system considered for the study of stability are the recycling external circuit (recycling pumps, valves) and the internal circuit (downcomer, jet pumps, lower full, driers, separators). The mathematical model is obtained applying mass balances and movement quantity in each one of the mentioned circuits. With respect to the nucleus model two regions are considered, the first one is made of a flow in one phase and the second one of a flow in two phases. For modelling the biphasic region it is considered homogenous flow. Generally it is studied the system behavior in the frequency domain starting from the transfer function applied to four operational states which correspond to the lower stability zone in the map power-flow of the Unit 1 of Laguna Verde power station. The Nyquist diagrams corresponding to each state as well as their characteristic frequency were determined. The results show that exists a very clear dependence of the power-flow relation on the stability of the system. It was found that the boiling length is an important parameter for the linear stability of the system. The obtained results show that the characteristic frequencies in unstability zones are similar to the reported data of the Unit 1 of the Laguna Verde power station in the event of power oscillations carried out in January 1995. (Author)

  7. Development of an interactive model of the Laguna Verde nuclear power plant based on the RELAP/SCDAP code

    International Nuclear Information System (INIS)

    Salazar C, J.H.; Ramos P, J.C.; Salazar S, E.; Chavez M, C.

    2003-01-01

    The present work describes the development of an interactive model of the Nuclear power plant of Laguna Verde (CNLV) based on the RELAP/SCDAP nuclear code, and it incorporation to a classroom simulator. The functional prototype it allows to make evaluations for operational transients and postulates accidents, with capacitation purposes, training, analysis and design. It emphasizes on the methodology used to establish the inter activity. Such methodology, is based on a modular structure in the one that multiple processes can be executed in an independent way and where the generated information is stored in segments of shared memory (characteristic that allows the UNIX operating system) and sent to the different processes by means of communication routines developed in C programming language. The utility of the system is demonstrated by means of the use of interactive display graphics (mimic diagrams, pictorials and tendency graphics) for the simultaneous dynamic visualization of the variables more significant that involve to the pattern of a transitory event type (for example failure of the controller of feeding water in a BWR reactor). Near with the interactive module, it was developed a model of the reactor of the CNLV for the code of better estimation RELAP/SCDAP. Finally the evaluation of the model is described, where it is interpreted in general form the behavior of those main variables that describe the stationary state, corroborating that follow the same tendency that those reported in the FSAR (Final Safety Analysis Report) of the Laguna Verde plant. The obtained results allow to conclude that the made development was satisfactory and that it presents enormous advantages regarding the capacity and time of analysis when using tools of visualization in real time of execution. (Author)

  8. Simulation of the aspersion system of the core low pressure (LPCS) for a boiling water reactor (BWR) based on RELAP

    International Nuclear Information System (INIS)

    Membrillo G, O. E.; Chavez M, C.

    2012-10-01

    The present work presents the modeling and simulation of the aspersion system to low pressure of reactor of the nuclear power plant of Laguna Verde using the nuclear code RELAP/SCDAP. The objective of the emergency systems inside a nuclear reactor is the cooling of the core, nor caring the performance of any other emergency system in the case of an accident design base for coolant loss. To obtain a simulation of the system is necessary to have a model based on their main components, pipes, pumps, valves, etc. This article describes the model for the simulation of the main line and the test line for the HPCS. At the moment we have the simulation of the reactor vessel and their systems associated to the nuclear power plant of Laguna Verde, this work will allow to associate the emergency system model LPCS to the vessel model. The simulation of the vessel and the emergency systems will allow knowing the behavior of the reactor in the stage of the coolant loos, giving the possibility to analyze diverse scenarios. The general model will provide an auxiliary tool for the training in classroom and at distance in the operation of nuclear power plants. (Author)

  9. VIPRE modeling of VVER-1000 reactor core for DNB analyses

    Energy Technology Data Exchange (ETDEWEB)

    Sung, Y.; Nguyen, Q. [Westinghouse Electric Corporation, Pittsburgh, PA (United States); Cizek, J. [Nuclear Research Institute, Prague, (Czech Republic)

    1995-09-01

    Based on the one-pass modeling approach, the hot channels and the VVER-1000 reactor core can be modeled in 30 channels for DNB analyses using the VIPRE-01/MOD02 (VIPRE) code (VIPRE is owned by Electric Power Research Institute, Palo Alto, California). The VIPRE one-pass model does not compromise any accuracy in the hot channel local fluid conditions. Extensive qualifications include sensitivity studies of radial noding and crossflow parameters and comparisons with the results from THINC and CALOPEA subchannel codes. The qualifications confirm that the VIPRE code with the Westinghouse modeling method provides good computational performance and accuracy for VVER-1000 DNB analyses.

  10. Analysis of the preliminary trajectory of emergency venting of the nuclear power plant of Laguna Verde using RELAP5; Analisis de la trayectoria preliminar del venteo de emergencia de la Central Laguna Verde mediante RELAP5

    Energy Technology Data Exchange (ETDEWEB)

    Cecenas F, M.; Jimenez S, R.; Ovando C, R. [Instituto Nacional de Electricidad y Energias Limpias, Reforma No. 113, Col. Palmira, 42490 Cuernavaca, Morelos (Mexico); Tijerina S, F.; Tapia M, R. N., E-mail: mcf@iie.org.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km. 7.5, 94271 Veracruz (Mexico)

    2016-09-15

    For a commercial nuclear plant, the availability of a vent line to the atmosphere is an improvement to achieve the prevention and mitigation of the consequences of a severe accident. The importance of this system received greater attention after the Fukushima accident in 2011. Subsequently, in 2012 and 2013, the United States Nuclear Regulatory Commission issued documents stating that the venting must be able to dislodge 1% of the rated thermal power of the core without over pressurizing the primary container. To analyze the venting of the nuclear power plant of Laguna Verde, the line and the primary container are modeled using the thermo-hydraulic code RELAP5, simulating a release of 1% of the nominal licensed power to the container in the form of saturated steam. The vent has no problem to evacuate the energy and manages to keep the container without exceeding its design limit, and the highest percentage of thermal power that can channel the vent to the outside is approximately 3%. A sensitivity analysis increasing the diameter of the line to 14 inches allows increasing in 10% the percentage of power that can be vented to the outside without problem for the containment. (Author)

  11. Interpretation of seismic reflection data, Central Palo Duro Basin: Technical report

    International Nuclear Information System (INIS)

    1986-11-01

    Seismic reflection data from the Central Palo Duro Basin, Texas, were studied to identify and characterize geologic structure, potential hydrocarbon traps, and anomalies suggesting adverse features such as salt dissolution or diapirism. The data included seismic reflection data, geologic and geophysical data controlled by Stone and Webster Engineering Corporation, and data from the literature. These data comprised approximately 590 line-mi of seismic profiles over approximately 4000 mi 2 , plus well logs from 308 wells. The study addressed the section from shallow reflectors down to basement. Structural contour maps were prepared for the Upper San Andres, Near Top of Glorieta, Wolfcamp, and Precambrian horizons. Isopach maps were prepared for intervals between the Upper and Lower San Andres and between the Upper San Andres and the Wolfcamp. Interpretation indicates southeasterly dips in the northwest part of the mapped area and southwesterly dips in the southwest part. Geologic structures show a generally northwest alignment. Faults at the Precambrian level and geologic structures show a generally northwest alignment. Faulting in the area is largely limited to the Precambrian, but interpretation is uncertain. Evidence of post-Wolfcampian faulting is not recognized. Seismic data delineating the San Andres section indicate a stable section throughout the area. Anomalous reflection events possibly associated with subsurface salt dissolution were seen at the 800- to 1200-ft level in Swisher County. Other anomalies include an overthickened zone northwest of Westway and carbonate buildup in the Wolfcamp and Pennsylvanian in Randall County. Mississippian to Middle Pennsylvanian diastrophism resulting in the Amarillo Uplift and Matador Arch is not manifested structurally in the central Palo Duro Basin. Subsidence or gentle uplift contributed to some structural deformation

  12. Tritium in liquid phase in a BWR-5 like Laguna Verde; Tritio en fase liquida en un BWR-5 como Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F.; Vargas A, A.; Cardenas J, J., E-mail: francisco.tijerina@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km 7.5, Veracruz (Mexico)

    2011-11-15

    In boiling water reactors (BWR), the tritium (H{sub 3}) takes place mainly as a result of ternary fissions in the nuclear reactors, of those which 75% are in gaseous form and 25% in liquid form. In the liquid phase, the tritium is transported to the pipes of the primary coolant toward condensed tanks or tanks of drainage excesses of radioactive equipment, located in external areas of a BWR, as well as to the processes of radioactive wastes to be able to be directed to the liquid effluents. For that reason, is necessary to know the possible routes of the transport and processes of the tritium in a BWR to control this radioisotope in the site of the event of leaks in equipment s and buried pipes, avoiding that emigrates toward underground flowing and an impact to the environment and to the people in general. (Author)

  13. Mesa Verde--A Year-Round High School. A Descriptive Report of 1980-81.

    Science.gov (United States)

    Housden, Terry; Holmes, Lynda

    Mesa Verde High School was constructed in 1974 and is the last high school built in the San Juan (California) Unified District. It serves students in grades 9 through 12 and has an open enrollment policy. Mesa Verde operates on a year-round schedule with students divided into three tracks. Basically, each track is in session for 9 weeks and then…

  14. Epidemiology of the Zika Virus Outbreak in the Cabo Verde Islands, West Africa.

    Science.gov (United States)

    Lourenço, José; de Lourdes Monteiro, Maria; Valdez, Tomás; Monteiro Rodrigues, Júlio; Pybus, Oliver; Rodrigues Faria, Nuno

    2018-03-15

    The Zika virus (ZIKV) outbreak in the island nation of Cabo Verde was of unprecedented magnitude in Africa and the first to be associated with microcephaly in the continent. Using a simple mathematical framework we present a first epidemiological assessment of attack and observation rates from 7,580 ZIKV notified cases and 18 microcephaly reports between July 2015 and May 2016. In line with observations from the Americas and elsewhere, the single-wave Cabo Verdean ZIKV epidemic was characterized by a basic reproductive number of 1.85 (95% CI, 1.5 - 2.2), with overall the attack rate of 51.1% (range 42.1 - 61.1) and observation rate of 2.7% (range 2.29 - 3.33). Current herd-immunity may not be sufficient to prevent future small-to-medium epidemics in Cabo Verde. Together with a small observation rate, these results highlight the need for rapid and integrated epidemiological, molecular and genomic surveillance to tackle forthcoming outbreaks of ZIKV and other arboviruses.

  15. Cabo Verde, «Pousada» nos Caminhos do Atlântico. Interinfluências culturais num arquipélago miscigenado / Cape Verde, the «Pousada» of the Atlantico routes - cultural interinfluences in an interbred archipelago

    Directory of Open Access Journals (Sweden)

    José Silva Évora

    2014-12-01

    Full Text Available Descoberto entre 1460 e 1462, o Arquipélago de Cabo Verde, situado no Oceano Atlântico, constituiu ao longo de vários séculos, escala obrigatória dos navios que faziam as ligações atlânticas entre os portos das Américas, da Europa e da África Graças a sua situação privilegiada, o espaço cabo-verdiano não foi um mero ponto de reabastecimento, mas também um importante ponto de cruzamento de culturas e de raças. Pretende-se, neste texto, abordar o papel que Cabo Verde teve no Atlântico incidindo, particularmente, na dimensão cultural resultante do contacto entre povos e culturas provenientes de diferentes paragens que se fixaram no arquipélago ou que por aqui passaram. Procurar-se-á evidenciar não só a importância que Cabo Verde teve enquanto ponto de passagem obrigatória mas, sobretudo, as contribuições que mais marcadamente se denunciaram, isto é, os apports culturais que mais se acentuaram em Cabo Verde, como processos recebidos dos estrangeiros que por estas ilhas se cruzaram.The Archipelago of Cape Verde, discovered between 1460 and 1462, and situated in the Atlantic Ocean, had been considered for centuries one of the mandatory harbours of the ships that sailed across the Atlantic to the ports of America, Europe and Africa. Because of its strategic location, Cape Verdean anchorage was considered not only the supplying point, but also an important melting pot of races and cultures. It is intended to highlight the role of Cape Verde in the Atlantic focusing particularly on the cultural aspect, as a result of the influence of cultures and origins of people who had settled in or had passed by the archipelago. It is also aimed to underline the importance of Cape Verde as a mandatory gateway but, above all, to underline the remarkable contributions, such as the cultural “apports” by which Cape Verde were gripped, like processes brought by the foreigners who crossed these islands.

  16. Chemometric characterization of alembic and industrial sugar cane spirits from cape verde and ceará, Brazil.

    Science.gov (United States)

    Pereira, Regina F R; Vidal, Carla B; de Lima, Ari C A; Melo, Diego Q; Dantas, Allan N S; Lopes, Gisele S; do Nascimento, Ronaldo F; Gomes, Clerton L; da Silva, Maria Nataniela

    2012-01-01

    Sugar cane spirits are some of the most popular alcoholic beverages consumed in Cape Verde. The sugar cane spirit industry in Cape Verde is based mainly on archaic practices that operate without supervision and without efficient control of the production process. The objective of this work was to evaluate samples of industrial and alembic sugar cane spirits from Cape Verde and Ceará, Brazil using principal component analysis. Thirty-two samples of spirits were analyzed, twenty from regions of the islands of Cape Verde and twelve from Ceará, Brazil. Of the samples obtained from Ceará, Brazil seven are alembic and five are industrial spirits. The components analyzed in these studies included the following: volatile organic compounds (n-propanol, isobutanol, isoamylic, higher alcohols, alcoholic grade, acetaldehyde, acetic acid, acetate); copper; and sulfates.

  17. Verde urbano e processi ambientali: per una progettazione di paesaggio multifunzionale

    Directory of Open Access Journals (Sweden)

    Raffaele Pelorosso

    2013-04-01

    Full Text Available L’impermeabilizzazione delle superfici determina un’alterazione del sistema idrologico, con un incremento dei volumi e dei picchi dei deflussi delle acque meteoriche. Il fenomeno è destinato a progredire, sia per il contributo che vi deriva dalla costante crescita delle superfici urbanizzate (urban sprawl, sia per i cambiamenti climatici in atto, che accentuano la frequenza delle piogge critiche. Una serie di misure e tecniche (Best Management Practices, BMPs sono state sviluppate per la gestione sostenibile delle acque meteoriche urbane. Alcune  BMPs (es: verde pensile, bacini di detenzione/ritenzione, zone umide possono svolgere inoltre una funzione ecologica (divenendo habitat per specie animali e vegetali, di termoregolazione, estetica e di promozione del capitale sociale. È quindi necessario sperimentare metodologie di progettazione e gestione del verde urbano e periurbano, la cui multifunzionalità consente di perseguire la strada della sostenibilità ambientale. Su tale traccia, questo lavoro presenta un percorso metodologico orientato a valutare alcune strategie integrate di controllo dei deflussi urbani, attraverso l’aumento della permeabilità di alcune parti sensibili di città. Il verde, quindi, non è visto come semplice infrastruttura necessaria a soddisfare generici standard urbanistici, ma ne sono analizzate le funzionalità, in questa prima fase di carattere idrologico, ma che, in prospettiva, con la stessa armatura verde, esso può assumere un ruolo ecologico, sociale, di mitigazione del clima e di emissione di gas clima-alteranti.

  18. Research needs for risk-informed, performance-based regulation

    International Nuclear Information System (INIS)

    Bailey, J.A.

    1997-01-01

    Palo Verde Nuclear Generating Station has used PRA-derived risk insights for about 10 years now. The plant originally started applying PRA modeling to an auxiliary feedwater system during the initial licensing phases of the plant, and as a result of that, they were able to work with the NRC and apply some graded quality requirements to that particular system. There was a third redundant auxiliary feedwater pump, and they now can treat that system as partially safety related and partially non-safety related. So it was an advance for Palo Verde at that time to be able to make decisions with a PRA and they began learning how to use those techniques. After completing the IPE it became natural for the plant to make a transition into other areas at the plant to look for areas where the insights gained from PRA could be applied into their decision-making processes. Those that the plant embarked upon initially were areas where they could gain operational risk assessment insights. The author goes on to discuss experiences gained in using these techniques to better assess the safety of operations within the plant. In addition he offers comments on areas which need further development and research to make them more applicable to a plant by plant basis

  19. Self-assessment: Strategy for higher standards, consistency, and performance

    International Nuclear Information System (INIS)

    Ide, W.E.

    1996-01-01

    In late 1994, Palo Verde operations underwent a transformation from a unitized structure to a single functional unit. It was necessary to build consistency in watchstanding practices and create a shared mission. Because there was a lack of focus on actual plant operations and because personnel were deeply involved with administrative tasks, command and control of evolutions were weak. Improvement was needed. Consistent performance standards have been set for all three operating units. These expectation focus on nuclear, radiological, and industrial safety. Straightforward descriptions of watchstanding and monitoring practices have been provided to all department personnel. The desired professional and leadership qualities for employee conduct have been defined and communicated thoroughly. A healthy and competitive atmosphere developed with the successful implementation of these standards. Overall performance improved. The auxiliary operators demonstrated increased pride and ownership in the performance of their work activities. In addition, their morale improved. Crew teamwork improved as well as the quality of shift briefs. There was a decrease in the noise level and the administrative functions in the control room. The use of self-assessment helped to anchor and define higher and more consistent standards. The proof of Palo Verde's success was evident when an Institute of Nuclear Power Operations finding was turned into a strength within 1 yr

  20. Preliminary analysis of an hydrogen generator system based on nuclear energy in the Laguna Verde site; Analisis preliminar de un sistema generador de hidrogeno basado en energia nuclear en el sitio de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Flores y Flores, A [FI-UNAM, 04500 Mexico D.F. (Mexico); Francois L, J L [FI-UNAM, Jiutepec, Morelos (Mexico)

    2003-07-01

    The shortage of fossil fuels in the next future, as well as the growing one demand of energetics and the high cost of the production of alternating fuels, it forces us to take advantage of to the maximum the fossil fuel with the one which we count and to look for the form of producing alternating fuels at a low cost and better even if these supply sources are reliable and non pollutants. It is intended a solution to the shortage of fuel; to use the thermal energy liberated of some appropriate nuclear reactor to be able to obtain a fuel but clean and relatively cheap as it is the hydrogen. In the first place the methods were looked for to produce hydrogen using thermal energy, later it was analyzed the temperature liberated by the existent nuclear reactors as well as the advanced designs, according to this liberated temperature settled down that the methods but feasible to produce hydrogen its were the one of reformed with water stream of the natural gas (methane) and the other one of the S-I thermochemical cycle, and the nuclear reactors that give the thermal energy for this production they are those of gas of high temperature. Once established the processes and the appropriate reactors, it was analyzed the site of Laguna Verde, with relationship to the free space to be able to place the reactor and the plant producer of hydrogen, as well as the direction in which blow the dominant winds and the near towns to the place, it was carried out an analysis of some explosion of tanks that could store hydrogen and the damage that its could to cause depending from the distance to which its were of the fire. Finally it was carried out an evaluation of capital and of operation costs for those two methods of hydrogen production. (Author)

  1. Paso del Aguilo : bol hémisphérique type Rio Verde Poli

    OpenAIRE

    Michelet , Dominique

    1981-01-01

    Zone IV, site n°2. Las Colaciones, Paso del Aguila, municipio Armadillo, San Luis Potosi.Bol "hémisphérique" profond du type Rio Verde poli. Engobe brun clair. 3 pieds en bouton à peine esquissés. Hauteur totale 7 centimètres. Diamètre de l'ouverture 11,5 centimètres. Collection particulière. Paso del Aguila.

  2. The apid cuckoo bees of the Cape Verde Islands (Hymenoptera, Apidae).

    Science.gov (United States)

    Straka, Jakub; Engel, Michael S

    2012-01-01

    The apid cuckoo bees of the Cape Verde Islands (Republic of Cape Verde) are reviewed and five species recognized, representing two genera. The ammobatine genus Chiasmognathus Engel (Nomadinae: Ammobatini), a specialized lineage of cleptoparasites of nomioidine bees is recorded for the first time. Chiasmognathus batelkaisp. n. is distinguished from mainland African and Asian species. The genus Thyreus Panzer (Apinae: Melectini) is represented by four species - Thyreus denoliisp. n., Thyreus batelkaisp. n., Thyreus schwarzisp. n., and Thyreus aistleitnerisp. n. Previous records of Thyreus scutellaris (Fabricius) from the islands were based on misidentifications.

  3. INFLUÊNCIA DOS STAKEHOLDERS NA ADOÇÃO DE ESTRATÉGIAS DE MARKETING VERDE

    Directory of Open Access Journals (Sweden)

    Benny Kramer Costa

    2012-01-01

    Full Text Available Este artigo tem como objetivo conhecer de que forma os stakeholders influenciam na adoção de estratégias de marketing verde sob a ótica da empresa Alfa, uma indústria moveleira situada no Rio Grande do Norte, Brasil. A metodologia utilizada teve uma abordagem qualitativa e utiliza o método do estudo de caso exploratóriodescritivo como modelo formal e sistemático do estudo científico. Segue as proposições teórico-conceituais de Polonsky (1995, Michell, Angle e Wood (1997 e Frooman (1999 como referências básicas que identifica e avalia o grau de importância dos stakeholders relevantes, mostra suas expectativas e necessidades e descreve as táticas utilizadas pelas empresas para a implantação de estratégias de marketing verde. O estudo descreve a realidade de uma indústria moveleira do Rio Grande do Norte, Brasil e mostra sua filosofia e contexto; identifica os stakeholders presentes, analisa o grau de importância de cada grupo relevante e mostra suas necessidades e expectativas e por fim, constata as mudanças ocorridas na organização na implantação de estratégias de marketing verde. A partir dos resultados obtidos conclui que os stakeholders são levados em consideração na adoção de estratégias de marketing verde, mesmo a empresa não possuindo a devida percepção estratégica necessária para avançar na adoção da filosofia do marketing verde. Este estudo de caso explora conhecimentos que podem ser apropriados e adequados por empresas de pequeno porte que atuem nesse segmento-tendência estratégico do marketing verde.

  4. Preliminary synthesis and assessment of environmental flows in the middle Verde River watershed, Arizona

    Science.gov (United States)

    Paretti, Nicholas; Brasher, Anne M. D.; Pearlstein, Susanna L.; Skow, Dena M.; Gungle, Bruce W.; Garner, Bradley D.

    2018-05-15

    analysis showed native fish in greater abundance in the upper-middle reaches of the Verde River watershed and generally decreasing with downstream distance. The median relative abundance of native fish decreased by 50 percent from reach 1 to reach 5. Using the reach scheme based on degree of flow alteration, nondiverted reaches were found to have a greater abundance of native fish than diverted reaches. In heavily diverted reaches, non-native species outnumbered native species.Fish metrics and stream-flow metrics for the 30, 90, and 365-day periods before collection were computed and the results analyzed statistically. Only abundance of all fish species was associated with the 30-day flow metrics. The 90-day flow metrics were generally positively associated with fish metrics, whereas the 365-day flow metrics had more negative correlations. In particular, significant relations were found between fish metrics and the magnitude and frequency of high flows, including maximum monthly flow, median annual number of high-flow events, and median annual maximum streamflow. Native sucker (Catostomidae) populations tended to decrease in periods of extended base flow, and fish in the non-native sunfish family (Centrarchidae) decreased in periods of flashy, high magnitude flows.A pilot study surveyed fish at five locations in the upper part of the middle Verde River watershed as a means to measure microhabitat availability and quantify native and non-native fish use of that available microhabitat. Results indicated that native and non-native species exhibit some clear differences in microhabitat use. Although at least some native and non-native fish were found in each velocity, depth, and substrate category, preferential microhabitat use was common. On a percentage basis, non-native species had a strong preference for slow-moving and deeper water with silt and sand substrate, with a secondary preference for faster moving and very shallow water and a coarse gravel substrate. Native

  5. Verde plant bug (Hemiptera: Miridae) feeding injury to cotton bolls characterized by boll age, size, and damage ratings.

    Science.gov (United States)

    Armstrong, J Scott; Brewer, Michael J; Parker, Roy D; Adamczyk, J J

    2013-02-01

    The verde plant bug, Creontiades signatus (Distant), has been present in south Texas for several years but has more recently been documented as an economic threat to cultivated cotton, (Gossypium hirsutum L. Our studies over 2 yr (2009 and 2010) and two locations (Weslaco and Corpus Christi, TX) investigated feeding-injury of the verde plant bug to a range of cotton boll age classes defined by boll diameter and accumulated degree-days (anthesis to the time of infesting) for first-position cotton bolls infested with the plant bugs. The most detrimental damage to younger cotton holls from verde plant bug feeding was boll abscission. Cotton bolls verde plant bug injured bolls compared with the controls up to 162 ACDD or a mean boll diameter 2.0 cm. Cotton seed weights were significantly reduced up to 179 ACDD or a boll diameter of 2.0 cm at Weslaco in 2009, and up to 317 ACDD or boll diameter 2.6 cm for Weslaco in 2010 when compared with the noninfested controls. Lint weight per cotton boll for infested and noninfested bolls was significantly reduced up to 262 ACDD or boll diameter 2.5 for Corpus Christi in 2010 and up to 288 ACCD or boll diameter 2.6 cm for Weslaco, TX, in 2010. Damage ratings (dependant variable) regressed against infested and noninfested seed-cotton weights showed that in every instance, the infested cotton bolls had a strong and significant relationship with damage ratings for all age classes of bolls. Damage ratings for the infested cotton bolls that did not abscise by harvest showed visual signs of verde plant bug feeding injury and the subsequent development ofboll rot; however, these two forms of injury causing lint and seed mass loss are hard to differentiate from open or boll-locked cotton bolls. Based on the results of both lint and seed loss over 2 yr and four studies cotton bolls should be protected up to approximately 300 ACDD or a boll diameter of 2.5 cm. This equilibrates to bolls that are 12-14 d of age dependent upon daily maximum

  6. O sistema de animação Web da Rota dos Vinhos Verdes(Norte de Portugal

    Directory of Open Access Journals (Sweden)

    José Luís Reis

    2016-01-01

    Full Text Available The Web animation system of the Vinhos Verdes Route, assists, through a Web based technology platform, individuals to organize visits to places of tourist interest in the Vinhos Verdes Region. The animation system managed the content associated with the route members, the locations that contain services/ activities, the routes, the news and events that constitute a repository of all relevant information inherent to the heritage associated with wine tourism in the Vinhos Verdes Region. The animation system, which includes a Database Management System, interacts with a map‑based Framework of the Google Maps system, and is integrated in the Vinhos Verdes Region Web portal, establishing itself as one of the technical tools used by marketing, particularly to disseminate content, to understand the visitor’s origin and how they navigate in the Web animation system.

  7. Chemometric Characterization of Alembic and Industrial Sugar Cane Spirits from Cape Verde and Ceará, Brazil

    Directory of Open Access Journals (Sweden)

    Regina F. R. Pereira

    2012-01-01

    Full Text Available Sugar cane spirits are some of the most popular alcoholic beverages consumed in Cape Verde. The sugar cane spirit industry in Cape Verde is based mainly on archaic practices that operate without supervision and without efficient control of the production process. The objective of this work was to evaluate samples of industrial and alembic sugar cane spirits from Cape Verde and Ceará, Brazil using principal component analysis. Thirty-two samples of spirits were analyzed, twenty from regions of the islands of Cape Verde and twelve from Ceará, Brazil. Of the samples obtained from Ceará, Brazil seven are alembic and five are industrial spirits. The components analyzed in these studies included the following: volatile organic compounds (n-propanol, isobutanol, isoamylic, higher alcohols, alcoholic grade, acetaldehyde, acetic acid, acetate; copper; and sulfates.

  8. Reduced foraging in the presence of predator cues by the Black Spiny-tailed Iguana, Ctenosaura similis (Sauria: Iguanidae)

    OpenAIRE

    Vincent R. Farallo; Mahmood Sasa; Dennis K. Wasko; Michael R. J. Forstner

    2010-01-01

    The presence of a predator may have direct and indirect effects on the behavior of the prey. Although altered behavior may help prey avoid predators, it also can have a potential impact on critical activities such as foraging. Predator-prey interactions are routinely studied in laboratory-based experiments owing to theperceived difficulties of conducting such experiments in natural settings. We conducted an experimental study under field conditions in Palo Verde National Park in northwestern ...

  9. Novel Deployment of Mobile Eddy Covariance Tower Observations Across Variations in the Built Environment in a Desert Urban Area

    Science.gov (United States)

    2015-11-03

    buildings); (2) high-density urban site (asphalt-paved parking lot near a high-traffic intersection); and 3) suburban mesic landscape (turf grass with...University campuses: (1) xeric landscape (gravel cover and palo verde trees with drip-irrigation systems near tall buildings); (2) high-density urban site...classification of each source area. The xeric site and high-density urban site behave like a semiarid landscape , with high Bowen ratios (~3 and ~8 respectively

  10. Los Angeles-Long Beach Harbor Areas Cultural Resource Survey, Los Angeles County, California,

    Science.gov (United States)

    1978-04-01

    into nettles and stung by red ants while the adult the Panes or White-heded Eagle Maiden. hunters danced to deerbone flute music. Intriguing sand... combat excepting those in the Philippine Islands (Fort Mills, Fort Hughes, Fort Drum and Fort Frank). It was during the World War II conflict, the...Junior Pest President, Californ a History and Landmarks Club of Los Angeles, Inglewod, February, 1941). Statoments of Mr. Ralph Bandinl, Palo Verdes. Mrs

  11. Second status report on regional ground-water flow modeling for the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    Regional ground-water flow within the principal geohydrologic units of the Palo Duro Basin is evaluated by developing a conceptual model of the flow regime and testing the model using a three-dimensional, finite-difference flow code. Sensitivity analyses (a limited parametric study) are conducted to define the system responses to changes in the conceptual model. Of particular interest are the impacts of salt permeability and potential climatic changes on the system response. The conceptual model is described in terms of its areal and vertical discretization, aquifer properties, fluid properties and hydrologic boundary conditions. The simulated ground-water flow fields are described with potentiometric surfaces, tables summarizing the areal and vertical volumetric flows through the principal units, and Darcy velocities within specified finite-difference blocks. The reported work is the second stage of an ongoing evaluation of the Palo Duro Basin as a potential repository for high-level radioactive wastes. The results and conclusions should thus be considered preliminary and subject to modification with the collection of additional data. However, the report does provide a useful basis for describing the sensitivity of the present conceptualization of ground-water flow to particular parameters and, to a lesser extent, the uncertainties in the present conceptualization. 28 refs., 44 figs., 13 tabs

  12. Estimation of seismic return periods in the Laguna Verde nuclear plant; Estimacion de periodos de retorno sismico en la PNLV

    Energy Technology Data Exchange (ETDEWEB)

    Flores R, J.H

    1992-01-15

    The study of seismic risk in the area of the Laguna Verde Nucleo electric plant (PNLV) and its surroundings, one carries out estimating the different return periods and the occurrence probability in different intervals of time (5, 75, 100, 125, 150 years starting from the distribution of first type of Gumbel (G1) of extreme values (Burton, 1986), the value that was used to evaluate the useful life of the PNLV was of 50 years, the other periods will be occupy to evaluate 'temporal' nuclear cemeteries, that is to say for diminish the radioactive activity of the fuel assemblies already burned in the reactor pool or in a near place to the place. The seismic data that were used for the analysis were of the seismic catalog that it was elaborated from (1920-1982), around the place whose seismic half magnitude was of 5 grades Richter and a depth 65 km, these earthquakes are classified as shallow earthquakes, which are located in the continental plaque of North-America, these they are induced by the efforts of push of the plaque of Cocos, existing 36% of intermediate and 2 of deep earthquakes. (Author)

  13. Estimation of seismic return periods in the Laguna Verde nuclear plant; Estimacion de periodos de retorno sismico en la PNLV

    Energy Technology Data Exchange (ETDEWEB)

    Flores R, J H

    1992-01-15

    The study of seismic risk in the area of the Laguna Verde Nucleo electric plant (PNLV) and its surroundings, one carries out estimating the different return periods and the occurrence probability in different intervals of time (5, 75, 100, 125, 150 years starting from the distribution of first type of Gumbel (G1) of extreme values (Burton, 1986), the value that was used to evaluate the useful life of the PNLV was of 50 years, the other periods will be occupy to evaluate 'temporal' nuclear cemeteries, that is to say for diminish the radioactive activity of the fuel assemblies already burned in the reactor pool or in a near place to the place. The seismic data that were used for the analysis were of the seismic catalog that it was elaborated from (1920-1982), around the place whose seismic half magnitude was of 5 grades Richter and a depth 65 km, these earthquakes are classified as shallow earthquakes, which are located in the continental plaque of North-America, these they are induced by the efforts of push of the plaque of Cocos, existing 36% of intermediate and 2 of deep earthquakes. (Author)

  14. Psychosocial concomitants of loneliness among students of Cape Verde and Portugal.

    Science.gov (United States)

    Neto, F; Barros, J

    2000-09-01

    This research is an examination of the relationship between loneliness and a number of psychosocial variables (e.g., affective state, cultural issues, gender, age) among adolescents and young adults from Cape Verde and Portugal. Two studies are presented. The participants in the first study were 285 adolescents from Cape Verde and 202 from Portugal, and in the second study there were 134 college students from Cape Verde and 112 from Portugal. The following instruments were administered to all the participants in both studies: The Revised UCLA Loneliness Scale (D. Russell, L. Peplau, & C. Cutrona, 1980), the Neuroticism Scale (J. Barros, 1999), the Optimism Scale (J. Barros, 1998), the Social Anxiety subscale (A. Fenigstein, M. Scheier, & A. Buss, 1975), and the Satisfaction With Life Scale (E. Diener, R. Emmons, R. Larsen, & S. Griffin, 1985). No ethnic or gender differences were found for loneliness between the two groups. For both groups, the most prominent predictors of loneliness were neuroticism and dissatisfaction with life. However, as expected, the adolescent group recorded higher scores for loneliness than did the college students.

  15. BENEFÍCIOS DA BIOMASSA DE BANANA VERDE Á SAÚDE HUMANA

    Directory of Open Access Journals (Sweden)

    Vânia Thais Silva Gomes

    2017-03-01

    Full Text Available Este estudo tem por objetivo contextualizar os benefícios da biomassa de banana verde na saúde humana. A pergunta norteadora para a construção desta revisão integrativa foi: qual os benefícios da biomassa de banana verde para a saúde humana? Para a seleção dos estudos, utilizou-se as seguintes bases de dados eletrônicas: SCIELO (Scientific Eletronic Library Online, IBECS (Indice Bibliográfico Español de Ciencias de la Salud, LILACS (Literatura LatinoAmericana e do Caribe em Ciências da Saúde e MEDLINE (Medical Literature Analysis and Retrieval System Online. Concluiu-se que a biomassa da banana verde apresenta uma boa quantidade de nutrientes, vitaminas, fibras, o preparo é rápido e fácil, e o custo é acessível. É considerado um alimento funcional, pois apresenta prebióticos, amido resistente em sua composição, portanto considerada uma ótima fonte de nutrientes.

  16. ¿Cabría un desmarketing a la concepción del marketing verde actual? Una crítica a la teoría y la práctica del marketing verde

    Directory of Open Access Journals (Sweden)

    Tatiana Tola Cisneros

    2014-06-01

    Full Text Available Este artículo examina el constructo del Marketing Verde o Green Marketing revisando literatura en torno a lo teorizado y practicado. El texto presenta en primer lugar una reflexión particular sobre los aportes e implicaciones más relevantes en relación al marketing verde y su posible necesidad de reenfocarse. Luego, una identificación general del consumidor verde y de su rol dentro del proceso de gestión ambiental. Finalmente, se ofrecen en este trabajo algunas consideraciones sobre la necesaria aplicación del correcto concepto de Green Marketing sostenible dentro de la sociedad. Esta revisión servirá a otros investigadores que necesiten conocer el estado de la investigación en torno al Green Marketing. Además, individuos y organizaciones podrán beneficiarse de las estrategias de marketing verde sostenible para desarrollar campañas de Marketing Socioambiental con miras a generar un verdadero cambio en la conducta ambiental, con una conciencia perpetua, inmutable y que se transmita como valor innegable de generación en generación.

  17. Human effects on the hydrologic system of the Verde Valley, central Arizona, 1910–2005 and 2005–2110, using a regional groundwater flow model

    Science.gov (United States)

    Garner, Bradley D.; Pool, D.R.; Tillman, Fred D.; Forbes, Brandon T.

    2013-01-01

    Water budgets were developed for the Verde Valley of central Arizona in order to evaluate the degree to which human stresses have affected the hydrologic system and might affect it in the future. The Verde Valley is a portion of central Arizona wherein concerns have been raised about water availability, particularly perennial base flow of the Verde River. The Northern Arizona Regional Groundwater Flow Model (NARGFM) was used to generate the water budgets and was run in several configurations for the 1910–2005 and 2005–2110 time periods. The resultant water budgets were subtracted from one another in order to quantify the relative changes that were attributable solely to human stresses; human stresses included groundwater withdrawals and incidental and artificial recharge but did not include, for example, human effects on the global climate. Three hypothetical and varied conditions of human stresses were developed and applied to the model for the 2005–2110 period. On the basis of this analysis, human stresses during 1910–2005 were found to have already affected the hydrologic system of the Verde Valley, and human stresses will continue to affect the hydrologic system during 2005–2110. Riparian evapotranspiration decreased and underflow into the Verde Valley increased because of human stresses, and net groundwater discharge to the Verde River in the Verde Valley decreased for the 1910–2005 model runs. The model also showed that base flow at the upstream end of the study area, as of 2005, was about 4,900 acre-feet per year less than it would have been in the absence of human stresses. At the downstream end of the Verde Valley, base flow had been reduced by about 10,000 acre-feet per year by the year 2005 because of human stresses. For the 2005–2110 period, the model showed that base flow at the downstream end of the Verde Valley may decrease by an additional 5,400 to 8,600 acre-feet per year because of past, ongoing, and hypothetical future human

  18. EFEITO DA ADUBAÇÃO VERDE NA CULTURA DO MILHO (Zea mays L.

    Directory of Open Access Journals (Sweden)

    Maxwel Rodrigues Nascimento

    2017-03-01

    Full Text Available A adubação verde consiste no cultivo de diferentes espécies vegetais em uma mesma área, em sucessão ou simultaneamente com a finalidade principal de melhorar a fertilidade do solo. Prefere-se assim, aquelas que produzam maior volume de matéria seca, estejam menos sujeitas a pragas e doenças e que possuam sementes relativamente uniformes e fáceis de semear. As plantas da família Fabaceae são as mais utilizadas na adubação verde por apresentarem elevado potencial em fixar o nitrogênio atmosférico.  Objetivou-se com a realização deste trabalho elaborar uma revisão de literatura sobre o rendimento da cultura do milho em consórcio e sucessão às espécies vegetais utilizadas para adubação verde. Com base nos resultados obtidos é possível inferir que a prática da adubação verde na cultura do milho é viável, além de melhorar a fertilidade e as características físicas do solo diminui a dependência por adubos minerais.

  19. Desalination plan with nuclear reactors as part of a sustainable development program in Mexico; Plan de desalinizacion con reactores nucleares como parte de un programa de desarrollo sustentable en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Rojas A, O; Calleros M, G., E-mail: oziel.rojas.siimisa@gmail.com [Soluciones en Instrumentacion Integral y Mantenimiento Industrial y Servicios, S. A. de C. V. (Mexico)

    2016-09-15

    This paper presents a project for the desalination of seawater with nuclear reactors, in order to supply fresh water to the populations near to the nuclear power plant. A case study is proposed with the nuclear power plant of Laguna Verde, implementing a system that allows taking advantage of the residual heat of the seawater condensate stage and with this, to supply drinking water to the surrounding localities where the vital liquid is scarce. In addition, legislation is proposed to allow some of the thermal energy generated by reactors producing electrical energy in Mexico to be used for the desalination of seawater and/or hydrogen production. (Author)

  20. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's reports on preferred repository sites within the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Fenster, D.; Edgar, D.; Gonzales, S.; Domenico, P.; Harrison, W.; Engelder, T.; Tisue, M.

    1984-04-01

    Documents are being submitted to the Salt Repository Project Office (SRPO) of the US Department of Energy (DOE) by Battelle Memorial Institute's Office of Nuclear Waste Isolation (ONWI) to satisfy milestones of the Salt Repository Project of the Civilian Radioactive Waste Management Program. Some of these documents are being reviewed by multidisciplinary groups of peers to ensure DOE of their adequacy and credibility. Adequacy of documents refers to their ability to meet the standards of the US Nuclear Regulatory Commission, as enunciated in 10 CFR 60, and the requirements of the National Environmental Policy Act and the Nuclear Waste Policy Act of 1982. Credibility of documents refers to the validity of the assumptions, methods, and conclusions, as well as to the completeness of coverage. This report summarizes Argonne's review of ONWI's two-volume draft report entitled Identification of Preferred Sites within the Palo Duro Basin: Vol. 1 - Palo Duro Location A, and Vol. 2 - Palo Duro Location B, dated January 1984. Argonne was requested by DOE to review these documents on January 17 and 24, 1984 (see App. A). The review procedure involved obtaining written comments on the reports from three members of Argonne's core peer review staff and three extramural experts in related research areas. The peer review panel met at Argonne on February 6, 1984, and reviewer comments were integrated into this report by the review session chairman, with the assistance of Argonne's core peer review staff. All of the peer review panelists concurred in the way in which their comments were represented in this report (see App. B). A letter report and a draft of this report were sent to SRPO on February 10, 1984, and April 17, 1984, respectively. 5 references

  1. Start-up analysis of INET-5 MW district heating prototype reactor

    International Nuclear Information System (INIS)

    Li Tianshu

    1991-09-01

    The main features and thermohydraulic design parameters of the INET-5 MW reactor (INET: Institute of Nuclear Technology of Tsinghua University, Beijing) are presented. The start-up process and the effect of thermohydraulic instability on start-up process have been analyzed. The main obstacle of start-up process of INET-5 MW reactor is to pass the instability region from 1 atm to normal operation condition. For avoiding instability, the start-up process should be divided into two steps. The results of three different start-up proposals calculated by DACOL code are given and compared. The possibility of instabilities for each proposal has been checked. The checked results show that there is no instability during start-up of the three proposals. So, it is supposed that the INET-5 MW reactor can safely and stably reach the operation conditions. Finally, some conclusions about the effect of instability on start-up in boiling mode of INET-5MW reactor are given

  2. Internal event analysis for Laguna Verde Unit 1 Nuclear Power Plant. Accident sequence quantification and results

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1994-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant, CNSNS-TR 004, in five volumes. The reports are organized as follows: CNSNS-TR 004 Volume 1: Introduction and Methodology. CNSNS-TR4 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR 004 Volume 3: System Analysis. CNSNS-TR 004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR 005 Volume 5: Appendices A, B and C. This volume presents the development of the dependent failure analysis, the treatment of the support system dependencies, the identification of the shared-components dependencies, and the treatment of the common cause failure. It is also presented the identification of the main human actions considered along with the possible recovery actions included. The development of the data base and the assumptions and limitations in the data base are also described in this volume. The accident sequences quantification process and the resolution of the core vulnerable sequences are presented. In this volume, the source and treatment of uncertainties associated with failure rates, component unavailabilities, initiating event frequencies, and human error probabilities are also presented. Finally, the main results and conclusions for the Internal Event Analysis for Laguna Verde Nuclear Power Plant are presented. The total core damage frequency calculated is 9.03x 10-5 per year for internal events. The most dominant accident sequences found are the transients involving the loss of offsite power, the station blackout accidents, and the anticipated transients without SCRAM (ATWS). (Author)

  3. 78 FR 34373 - Campo Verde Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-06-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1541-000] Campo Verde Solar, LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Campo Verde...

  4. Renewable energy projects to electrify rural communities in Cape Verde

    International Nuclear Information System (INIS)

    Ranaboldo, Matteo; Lega, Bruno Domenech; Ferrenbach, David Vilar; Ferrer-Martí, Laia; Moreno, Rafael Pastor; García-Villoria, Alberto

    2014-01-01

    Highlights: • The design of 2 off-grid electrification projects in Cape Verde is developed. • Configurations with hybrid renewable energy systems and micro-grids are considered. • A detailed micro-scale wind resource assessment is carried out. • An optimization model is used in order to support the design. • The proposed system is economically beneficial in comparison with diesel generation. - Abstract: Even though Cape Verde has high wind and solar energy resources, the conventional strategy for increasing access to electricity in isolated rural areas is by centralized microgrids with diesel generators. In this study, the design of 2 off-grid electrification projects based on hybrid wind–photovoltaic systems in Cape Verde is developed and analyzed. The design considers some significant novelty features in comparison with previous studies. First a detailed wind resource assessment is carried out combining meso-scale wind climate data and a specialized micro-scale wind flow model. Then a mathematical model is used for the design of off-grid projects considering a combination of individual systems and microgrids. In this study, locations far from the demand points are also considered as possible generation points. Various design configurations are analyzed and compared. The proposed configurations exploit the highest wind potential areas and are economically beneficial in comparison with diesel generator systems

  5. The continuous improvement system of nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rivera C, A.

    2009-10-01

    This paper describes the continuous improvement system of nuclear power plant of Laguna Verde and the achievements in implementing the same and additionally two study cases are presents. In February 2009 is noteworthy because the World Association of Nuclear Operators we identified as a learning organization, qualification which shows that the continuous improvement system has matured, and this system will expose as I get to learn to capitalize on our own experiences and external experiences diffused by the nuclear industry. In 2007 the management of nuclear power plants integrates its improvement systems and calls it continuous improvement system and is presented in the same extensive report that won the National Quality Award. This system is made up of 5 subsystems operating individually and are also related 1) human performance; 2) referential comparison or benchmarking; 3) self-assessment; 4) corrective action and 5) external operating experience. Five subsystems that plan, generate, capture, manage, communicate and protect the knowledge generated during the processes execution of nuclear power plant of Laguna Verde, as well as from external sources. The target set in 2007 was to increase the intellectual capital to always give response to meeting the security requirements, but creating a higher value to quality, customer, environment protection and society. In brief each of them, highlighting the objective, expectations management, implementation and some benefits. At the end they will describe two study cases selected to illustrate these cases as the organization learns by their continuous improvement system. (Author)

  6. Super compacting of drums with dry solid radioactive waste in the nuclear power plant of Laguna Verde;Super compactacion de bidones con desecho radiactivo solido seco en la central nucleo electrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez G, R.; Lara H, M. A.; Cabrera Ll, M.; Verdalet de la Torre, O., E-mail: marco.lara@cfe.gob.m [Comision Federal de Electricidad, Central Nucleoelectrica de Laguna Verde, Carretera Nautla-Cardel Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2009-10-15

    The nuclear power plant of Laguna Verde located in the Gulf of Mexico, completes in this 2009, nineteen years to produce by nuclear means 4.78% of the electric power that Mexico requires daily. During this time, the Unit 1 has generated more of 88.85 million mega watt-hour and the Unit 2 more of 69.48 million mega watt-hour with an availability average of 83.55%. Derived of their operation cycles, the nuclear power plant has generated (as any other installation of its type) radioactive wastes of low activity that at the moment are temporarily stored in the site. Due to the life cycle of the nuclear power plant, actually has become necessary to begin a project series focused to continue guaranteeing the storage of these wastes, guarantee that is a license requirement for the operation of this nuclear installation before the National Commission of Nuclear Security and Safeguards. The Federal Commission of Electricity beginning a project that allows continue guaranteeing space of sufficient storage for the wastes that the nuclear power plant of Laguna Verde could generate for the rest of its useful life, this project consisted on a process of physical volume reduction of dry solid radioactive wastes denominated super compacting, it has made possible to reduce the volume that these wastes occupy in the temporary storage noted Dry Solid Radioactive Wastes Deposit located inside the site that occupies the nuclear power plant of Laguna Verde. This work presents the super compacting results, as well as a description of the realization of this task until concluding with the super compacting of 5,854 drums with dry solid radioactive waste of low activity. We will enunciate which were the radiological controls that the Department of Radiological Protection of the nuclear power plant of Laguna Verde applied to this work that was realized for first time in Mexico and the nuclear power plant. (Author)

  7. Preliminary analysis of an hydrogen generator system based on nuclear energy in the Laguna Verde site

    International Nuclear Information System (INIS)

    Flores y Flores, A.; Francois L, J.L.

    2003-01-01

    The shortage of fossil fuels in the next future, as well as the growing one demand of energetics and the high cost of the production of alternating fuels, it forces us to take advantage of to the maximum the fossil fuel with the one which we count and to look for the form of producing alternating fuels at a low cost and better even if these supply sources are reliable and non pollutants. It is intended a solution to the shortage of fuel; to use the thermal energy liberated of some appropriate nuclear reactor to be able to obtain a fuel but clean and relatively cheap as it is the hydrogen. In the first place the methods were looked for to produce hydrogen using thermal energy, later it was analyzed the temperature liberated by the existent nuclear reactors as well as the advanced designs, according to this liberated temperature settled down that the methods but feasible to produce hydrogen its were the one of reformed with water stream of the natural gas (methane) and the other one of the S-I thermochemical cycle, and the nuclear reactors that give the thermal energy for this production they are those of gas of high temperature. Once established the processes and the appropriate reactors, it was analyzed the site of Laguna Verde, with relationship to the free space to be able to place the reactor and the plant producer of hydrogen, as well as the direction in which blow the dominant winds and the near towns to the place, it was carried out an analysis of some explosion of tanks that could store hydrogen and the damage that its could to cause depending from the distance to which its were of the fire. Finally it was carried out an evaluation of capital and of operation costs for those two methods of hydrogen production. (Author)

  8. Relative frequencies of deletereo genes in populations of droshopila Melanogaster from Laguna Verde, Veracruz; Frecuencias relativas de genes deletereos en poblaciones de Drosophila melanogaster originarias de Laguna Verde, Veracruz

    Energy Technology Data Exchange (ETDEWEB)

    Salceda, V. M. [ININ, 52750 La Marquesa, Estado de Mexico (Mexico)]. e-mail: vmss@nuclear.inin.mx

    2008-07-01

    In order to obtain data about the possible changes and/or damages that could cause the operation of the reactors of the nuclear power plant of Laguna Verde to the populations of drosophila Melanogaster that lives in the zone, one carried out one series of biannual collections (summer and winter) during the years 1991-1992 and 1996-1998 to obtain individuals of this species and to subject them to a battery of tests. The flies of this species that it was possible to capture were transported to the Biology Laboratory of the National Institute of Nuclear Research, where they were put under in individual form a series of you cross they allowed that us in the third generation to detect the presence of deletereo genes that following their viability were catalogued like normal, lethal or less lethal according to the methodology of Wallace. This way a total of 933 second chromosomes was analyzed to leave of them the relative frequencies were calculated of each one of the categories, for each sample station. The result of the applied statistical test indicates us that not significant difference exists among the populations and that the differences of having them must only to the environment changes something that usually happen in all the population. For what we can point out that the presence of the reactors does not seem to influence negatively in the behavior of the population that lives in the zone. (Author)

  9. Preliminary simulation model to determine ground-water flow and ages within the Palo Duro Basin hydrogeologic province

    International Nuclear Information System (INIS)

    Atwood, H.; Picking, L.

    1986-01-01

    Ground-water flow through the Palo Duro and Tucumcari Basins is simulated by developing a hydrogeolgic profile and applying a cross-sectional, finite-element, numerical model to the profile. The profile is 350 miles long and 2 miles deep and extends from east-central New Mexico to the Texas-Oklahoma border. It is comprised of hydrogeologic units that are identified from geophysical well logs, sample logs, and core descriptions. A hydrogeologic unit as used in this profile is a physically continuous rock sequence with hydrologic properties that are relatively consistent throughout and distinct from surrounding units. The resulting hydrogeologic profile, with the exception of the Ogallala Formation and the Dockum Group, is discretized into a 6000-element mesh and a 22,000-element mesh. Permeability values assigned to hydrogeologic units were, in part, calculated from drill stem tests conducted throughout the Palo Duro Basin. Ground-water age and travel paths are determined by applying Darcy's equation to selected flow lines. The 170 million-year age determined from ground-water at points within the Wolfcamp Series compares favorably with the geochemical data for this region. An age of 188 million years is determined for the Pennsylvanian granite wash

  10. Soil and Water Conservation Strategies in Cape Verde (Cabo Verde in Portuguese and Their Impacts on Livelihoods: An Overview from the Ribeira Seca Watershed

    Directory of Open Access Journals (Sweden)

    Isaurinda Baptista

    2015-01-01

    Full Text Available Severe land degradation has strongly affected both people’s livelihood and the environment in Cape Verde (Cabo Verde in Portuguese, a natural resource poor country. Despite the enormous investment in soil and water conservation measures (SWC or SLM, which are visible throughout the landscape, and the recognition of their benefits, their biophysical and socioeconomic impacts have been poorly assessed and scientifically documented. This paper contributes to filling this gap, by bringing together insights from literature and policy review, field survey and participatory assessment in the Ribeira Seca Watershed through a concerted approach devised by the DESIRE project (the “Desire approach”. Specifically, we analyze government strategies towards building resilience against the harsh conditions, analyze the state of land degradation and its drivers, survey and map the existing SWC measures, and assess their effectiveness against land degradation, on crop yield and people’s livelihood. We infer that the relative success of Cape Verde in tackling desertification and rural poverty owes to an integrated governance strategy that comprises raising awareness, institutional framework development, financial resource allocation, capacity building, and active participation of rural communities. We recommend that specific, scientific-based monitoring and assessment studies be carried out on the biophysical and socioeconomic impact of SLM and that the “Desire approach” be scaled-up to other watersheds in the country.

  11. Part 2 -- current program integrating strategies and lubrication technology

    International Nuclear Information System (INIS)

    Johnson, B.

    1996-01-01

    This paper is the second of two that describe the Predictive Maintenance Program for rotating machinery at the Palo Verde Nuclear Generating Station. The Predictive Maintenance program has been enhanced through organizational changes and improved interdisciplinary usage of technology. This paper will discuss current program strategies that have improved the interaction between the Vibration and Lube Oil programs. The open-quotes Lube Oilclose quotes view of the combined program along with case studies will then be presented

  12. Part 2 -- current program integrating strategies and lubrication technology

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, B.

    1996-12-01

    This paper is the second of two that describe the Predictive Maintenance Program for rotating machinery at the Palo Verde Nuclear Generating Station. The Predictive Maintenance program has been enhanced through organizational changes and improved interdisciplinary usage of technology. This paper will discuss current program strategies that have improved the interaction between the Vibration and Lube Oil programs. The {open_quotes}Lube Oil{close_quotes} view of the combined program along with case studies will then be presented.

  13. Internal event analysis for Laguna Verde Unit 1 Nuclear Power Plant. Accident sequence quantification and results; Analisis de eventos internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Cuantificacion de secuencias de accidente y resultados

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Aguilar T, O; Nunez C, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1994-07-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the {sup I}nternal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant, CNSNS-TR 004, in five volumes. The reports are organized as follows: CNSNS-TR 004 Volume 1: Introduction and Methodology. CNSNS-TR4 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR 004 Volume 3: System Analysis. CNSNS-TR 004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR 005 Volume 5: Appendices A, B and C. This volume presents the development of the dependent failure analysis, the treatment of the support system dependencies, the identification of the shared-components dependencies, and the treatment of the common cause failure. It is also presented the identification of the main human actions considered along with the possible recovery actions included. The development of the data base and the assumptions and limitations in the data base are also described in this volume. The accident sequences quantification process and the resolution of the core vulnerable sequences are presented. In this volume, the source and treatment of uncertainties associated with failure rates, component unavailabilities, initiating event frequencies, and human error probabilities are also presented. Finally, the main results and conclusions for the Internal Event Analysis for Laguna Verde Nuclear Power Plant are presented. The total core damage frequency calculated is 9.03x 10-5 per year for internal events. The most dominant accident sequences found are the transients involving the loss of offsite power, the station blackout accidents, and the anticipated transients without SCRAM (ATWS). (Author)

  14. The Cape Verde Islands are home to a small and genetically distinct humpback whale breeding population

    NARCIS (Netherlands)

    Bérubé, Martine; Ryan, Conor; Berrow, Simon D.; Suarez, Pedro Lopez; Monteiro, Vanda; Wenzel, Frederick; Robbins, Jooke; Mattila, David; Vikingsson, G.A.; Øien, Nils; Palsboll, Per

    2013-01-01

    The Cape Verde Islands appear to be winter breeding ground of the smallest humpback whale population yet known. However, it is unclear whether the humpback whales at the Cape Verde Islands interbreed with those in the West Indies. Here we present the results of the genetic analysis of 50 humpback

  15. Geostatistical analysis of potentiometric data in Wolfcamp aquifer of the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Harper, W.V.; Furr, J.M.

    1986-04-01

    This report details a geostatistical analysis of potentiometric data from the Wolfcamp aquifer in the Palo Duro Basin, Texas. Such an analysis is a part of an overall uncertainty analysis for a high-level waste repository in salt. Both an expected potentiometric surface and the associated standard error surface are produced. The Wolfcamp data are found to be well explained by a linear trend with a superimposed spherical semivariogram. A cross-validation of the analysis confirms this. In addition, the cross-validation provides a point-by-point check to test for possible anomalous data

  16. Geology of the continental margin beneath Santa Monica Bay, Southern California, from seismic-reflection data

    Science.gov (United States)

    Fisher, M.A.; Normark, W.R.; Bohannon, R.G.; Sliter, R.W.; Calvert, A.J.

    2003-01-01

    We interpret seismic-reflection data, which were collected in Santa Monica Bay using a 70-in3 generator-injector air gun, to show the geologic structure of the continental shelf and slope and of the deep-water, Santa Monica and San Pedro Basins. The goal of this research is to investigate the earthquake hazard posed to urban areas by offshore faults. These data reveal that northwest of the Palos Verdes Peninsula, the Palos Verdes Fault neither offsets the seafloor nor cuts through an undeformed sediment apron that postdates the last sea level rise. Other evidence indicates that this fault extends northwest beneath the shelf in the deep subsurface. However, other major faults in the study area, such as the Dume and San Pedro Basin Faults, were active recently, as indicated by an arched seafloor and offset shallow sediment. Rocks under the lower continental slope are deformed to differing degrees on opposite sides of Santa Monica Canyon. Northwest of this canyon, the continental slope is underlain by a little-deformed sediment apron; the main structures that deform this apron are two lower-slope anticlines that extend toward Point Dume and are cored by faults showing reverse or thrust separation. Southeast of Santa Monica Canyon, lower-slope rocks are deformed by a complex arrangement of strike-slip, normal, and reverse faults. The San Pedro Escarpment rises abruptly along the southeast side of Santa Monica Canyon. Reverse faults and folds underpinning this escarpment steepen progressively southeastward. Locally they form flower structures and cut downward into basement rocks. These faults merge downward with the San Pedro Basin fault zone, which is nearly vertical and strike slip. The escarpment and its attendant structures diverge from this strike-slip fault zone and extend for 60 km along the margin, separating the continental shelf from the deep-water basins. The deep-water Santa Monica Basin has large extent but is filled with only a thin (less than 1.5-km

  17. Desalination plan with nuclear reactors as part of a sustainable development program in Mexico

    International Nuclear Information System (INIS)

    Rojas A, O; Calleros M, G.

    2016-09-01

    This paper presents a project for the desalination of seawater with nuclear reactors, in order to supply fresh water to the populations near to the nuclear power plant. A case study is proposed with the nuclear power plant of Laguna Verde, implementing a system that allows taking advantage of the residual heat of the seawater condensate stage and with this, to supply drinking water to the surrounding localities where the vital liquid is scarce. In addition, legislation is proposed to allow some of the thermal energy generated by reactors producing electrical energy in Mexico to be used for the desalination of seawater and/or hydrogen production. (Author)

  18. Summer sound-level characterization of the Deaf Smith County and Swisher County locations in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1984-03-01

    A description of sound levels and sound sources in the Deaf Smith County and Swisher County locations in the Palo Duro Basin during a period representative of the summer season is presented. Included are data collected during the period August 4 through 8, 1982, for both locations. 3 references, 2 figures, 3 tables

  19. The technology transfer and the Laguna Verde power plants

    International Nuclear Information System (INIS)

    Garza, R.F. de La

    1991-01-01

    The process of technology transfer to the construction of Laguna Verde Nuclear Power Plants, Mexico, is described. The options and the efforts for absorbing the technology of Nuclear Power Plant design and construction by the mexican engineers are emphasized. (author)

  20. Calculating of radiation doses in rutinary unloads of liquid wastes from Laguna Verde nuclear power plant.; Calculo de las dosis de radiacion debidas a las descargas rutinarias de desechos liquidos de la central nucleoelectrica de Laguna Verde.

    Energy Technology Data Exchange (ETDEWEB)

    Molina, G

    1986-12-31

    Utilization of nuclear energy to generate electricity is increasingly being used to replace fossil fuels. During operation of nuclear power plants, radioactive materials are produced, a small fraction of which are released to environment as liquid or gaseous effluents. Estimation of radiation doses caused by effluents release has three purposes. During design phase of a nuclear station it is useful to adapt the wastes treatment systems to acceptable limits. During licensing phase, the regulator organism verifies the design of nuclear station effectuating estimation of doses. Finally, during operation, before every unload of radioactive effluents, radiation doses should be evaluated in order to fulfill technical specifications limiting the release of radioactive materials to environment. 1. To perform calculations of individual doses due to liquid radioactive effluents unload in units 1 and 2 of Laguna Verde nuclear power plant (In licensing phase). 2. To perform a parametric study of the effect of unload recirculation over individual dose, since recirculation has two principal effects: thermodynamical effects in nuclear station and radioactivity concentration; the last can affect the fullfilment of dose limits. 3. To perform the calculation of collective doses causes by unloads of liquid effluents within a radius of 80 km of the plant caused by unload of liquid radioactive effluents during normal operation and does not include doses during accident conditions. In Mexico the organism in charge of regulation of peaceful uses of nuclear energy is Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) and for Laguna Verde licensing, the regulations of the country who manufactured the reactor (USA). In Appendix C, units are explained.

  1. Transient analysis for Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Ramos Pablos, J.C. et.al.

    1991-01-01

    Relationship between transients analysis and safety of Laguna Verde nuclear power plant is described a general panorama of safety thermal limits of a nuclear station, as well as transients classification and events simulation codes are exposed. Activities of a group of transients analysis of electrical research institute are also mentioned (Author)

  2. Insecticide susceptibility of Aedes aegypti populations from Senegal and Cape Verde Archipelago.

    Science.gov (United States)

    Dia, Ibrahima; Diagne, Cheikh Tidiane; Ba, Yamar; Diallo, Diawo; Konate, Lassana; Diallo, Mawlouth

    2012-10-22

    Two concomitant dengue 3 (DEN-3) epidemics occurred in Cape Verde Archipelago and Senegal between September and October 2009. Aedes aegypti was identified as the vector of these epidemics as several DEN-3 virus strains were isolated from this species in both countries. The susceptibility to pyrethroids, organochlorine, organophosphates and carbamate was investigated in two field strains of Aedes aegypti from both countries using WHO diagnostic bioassay kits in order to monitor their the current status of insecticide susceptibility. The two tested strains were highly resistant to DDT. The Cape Verde strain was found to be susceptible to all others tested insecticides except for propoxur 0.1%, which needs further investigation. The Dakar strain was susceptible to fenitrothion 1% and permethrin 0.75%, but displayed reduced susceptibility to deltamethrin, lambda-cyhalothrin and propoxur. As base-line results, our observations stress a careful management of insecticide use for the control of Ae. aegypti. Indeed, they indicate that DDT is no longer efficient for the control of Ae. aegypti populations in Cape Verde and Dakar and further suggest a thorough follow-up of propoxur susceptibility status in both sites and that of deltamethrin and lambda-cyhalothrin in Ae. aegypti populations in Dakar. Thus, regular monitoring of susceptibility is greatly needed as well as the knowing if this observed resistance/susceptibility is focal or not and for observed resistance, the use of biochemical methods is needed with detailed comparison of resistance levels over a large geographic area. Aedes aegypti, Insecticides, Susceptibility, Cape Verde, Senegal.

  3. Safety evaluation report related to the operation of Palo Verde Nuclear Generating Station, Units, 1, 2, and 3: Docket Nos. STN 50-528, STN 50-529, and STN 50-530

    International Nuclear Information System (INIS)

    1983-03-01

    Information is presented concerning site characteristics; mechanical systems and components; reactor coolant system; engineered safety systems; reactor instrumentation; reactor operations; and quality assurance

  4. 76 FR 43684 - Verde Energy USA Trading, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2011-07-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-4041-000] Verde Energy USA Trading, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Verde Energy USA Trading, LLC's application for market-based rate authority, with an accompanying rate...

  5. Applicability of RELAP5 for safety analysis of AP600 and PIUS reactors

    International Nuclear Information System (INIS)

    Motloch, C.G.; Modro, S.M.

    1990-01-01

    An assessment of the applicability of using RELAP5 for performing safety analyses of the AP600 and PIUS advanced reactor concepts is being performed. This ongoing work is part of a larger safety assessment of advanced reactors sponsored by the United States Nuclear Regulatory Commission. RELAP5 models and correlations are being reviewed from the perspective of the new AP600 and PIUS phenomena and features that could be important to reactor safety. The purpose is to identify those areas in which new mathematical models of physical phenomena would be required to be added to RELAP5. In most cases, the AP600 and PIUS designs and systems and the planned and off-normal operations are similar enough to current Pressurized Water Reactors (PWR) that RELAP5 safety analysis applicability is unchanged. However, for AP600 the single most important systemic and phenomenological difference between it and current PWRs is in the close coupling between the reactor system and the containment during postulated Loss of Coolant Accident (LOCA) events. This close coupling may require the addition of some thermal-hydraulic models to RELAP5. And for PIUS, the most important new feature is the thermal density locks. These and other important safety-related features are discussed. This document presents general descriptions of RELAP5, AP600, and PIUS, describes the new features and phenomena of the reactors, and discusses the code/reactors safety-related issues. 32 refs., 4 figs., 2 tabs

  6. PROCESSAMENTO DE CASCA E FIBRA DE COCO VERDE POR CARBONIZAÇÃO PARA AGREGAÇÃO DE VALOR / PROCESSING OF COCONUT SHELL AND FIBER FOR ADDING VALUE

    Directory of Open Access Journals (Sweden)

    LUIS A. B. CORTEZ

    2009-04-01

    Full Text Available Atualmente o Brasil é o maior produtor de coco verde, com uma área plantada equivalente a 57 mil hectares, onde a maior parte da parte da produção (66,5% se concentra na região Nordeste. O descarte do coco depois do consumo da água representa um problema para os sistemas de coleta e tratamento de lixo, pela sua lenta degradação devido ao alto teor de fibras. Neste trabalho são mostrados os resultados da pirólise lenta da fibra e da casca do coco verde. Os experimentos foram conduzidos em um forno experimental de pequena capacidade, a uma temperatura de 350°C. Os resultados mostraram que o rendimento em carbono fixo foi de 74,43% para o endocarpo verde e 58,07% para o mesocarpo verde. O teor de cinzas, para as mesmas amostras, foi de 14,13% e 13,03%, respectivamente. Os teores de voláteis foram de 11,40% para o carvão obtido do endocarpo verde e, de 28,90% para o carvão obtido do mesocarpo verde. Ficou demonstrado que o resíduo do coco verde apresenta potencial para a produção de carvão vegetal. Porém ainda é preciso estudar o rendimento, utilizando para isto, sistemas em maior escala, avaliando também o emprego integral (casca e fibra, além de estudos econômicos que considerem os custos de logística e acondicionamento.Palavras Chaves: pirólise lenta, carbonização, resíduos de coco.

  7. Origin and Population Dynamics of a Novel HIV-1 Subtype G Clade Circulating in Cape Verde and Portugal.

    Science.gov (United States)

    de Pina-Araujo, Isabel Inês M; Delatorre, Edson; Guimarães, Monick L; Morgado, Mariza G; Bello, Gonzalo

    2015-01-01

    The human immunodeficiency virus type 1 (HIV-1) subtype G is the most prevalent and second most prevalent HIV-1 clade in Cape Verde and Portugal, respectively; but there is no information about the origin and spatiotemporal dispersal pattern of this HIV-1 clade circulating in those countries. To this end, we used Maximum Likelihood and Bayesian coalescent-based methods to analyze a collection of 578 HIV-1 subtype G pol sequences sampled throughout Portugal, Cape Verde and 11 other countries from West and Central Africa over a period of 22 years (1992 to 2013). Our analyses indicate that most subtype G sequences from Cape Verde (80%) and Portugal (95%) branched together in a distinct monophyletic cluster (here called G(CV-PT)). The G(CV-PT) clade probably emerged after a single migration of the virus out of Central Africa into Cape Verde between the late 1970s and the middle 1980s, followed by a rapid dissemination to Portugal a couple of years later. Reconstruction of the demographic history of the G(CV-PT) clade circulating in Cape Verde and Portugal indicates that this viral clade displayed an initial phase of exponential growth during the 1980s and 1990s, followed by a decline in growth rate since the early 2000s. Our data also indicate that during the exponential growth phase the G(CV-PT) clade recombined with a preexisting subtype B viral strain circulating in Portugal, originating the CRF14_BG clade that was later disseminated to Spain and Cape Verde. Historical and recent human population movements between Angola, Cape Verde and Portugal probably played a key role in the origin and dispersal of the G(CV-PT )and CRF14_BG clades.

  8. 77 FR 38280 - Verde Energy USA New York, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-2071-000] Verde Energy USA New York, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Verde Energy USA New York, LLC's application for market-based rate authority, with an accompanying rate...

  9. Influências da Preocupação Ambiental e do Ceticismo frente à Propaganda no Consumo de Produtos Verdes

    Directory of Open Access Journals (Sweden)

    Dirceu da Silva

    2015-12-01

    Full Text Available Com o objetivo analisar a influência do ceticismo e da preocupação ambiental na percepção do indivíduo para a intenção de compra e compra declarada de produtos verdes no varejo, foi realizado um survey com 1233 consumidores para observar este efeito na relação entre intenção e compra declarada de produtos verdes e entender a disposição do consumidor em transformar sua preocupação ambiental e sua confiança no apelo verde do produto em prática. Como resultado, foi observado que o consumidor leva mais em consideração a sua rotina de compra e a sua experiência passada do que a preocupação ambiental e a influência de propagandas com apelo verde. Sendo assim, o consumo de produtos verdes no varejo precisa de mecanismos voltados para a mudança de habito e quebra de paradigmas (consumidor e varejista.

  10. Nuclear research reactor 0.5 to 3 MW

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-05-15

    This nuclear reactor has been designed for radioisotope production, basic and applied research in reactor physics and nuclear engineering, neutron-beam experimentation, irradiation of various materials and training of scientific and technical personnel. It is located in the 'Production Area' of the Nuclear Technology Center. It is equipped with the necessary facilities for large-scale production of radioisotopes to be used in medicine as well as for other scientific and industrial purposes. In addition, it has a Neutronography Facility and the required equipment to perform Neutron-Activation Analysis. It is an open pool-type reactor, moderated and cooled with light water, fuelled with 20% enriched uranium. Its reflector are graphite and water. It has plate-type fuel elements clad in aluminium. The reactor core is located near the bottom of the demineralized water pool. It includes fuel elements, reflector and sample-holding devices for materials to be irradiated. This kind of configuration, which is widely used in research reactors, provides a high degree of safety since it prevents the core from becoming exposed under any circumstance and does not require any cooling system during reactor shutdown. Power output is between 0.5 to 3 MW{sub TH}, with a minimum thermal neutron flux of approx, 10{sup 13} n/cm{sup 2}{center_dot}sec, at irradiation zone almost with no modifications. Heat extraction is achieved by means of a cooling circuit which comprises two circulation pumps and a plate-type heat exchanger. Final heat dissipation to the atmosphere is performed through another cooling circuit which includes two circulation pumps and a cooling tower. Reactor control is accomplished with five neutron-absorbing rods positioned by means of especially designed elements and governed by the reactor's instrumentation and control system. Should an abnormal situation arise, gravity causes the rods to fall automatically, thus extinguishing the nuclear reaction. The reactor

  11. Nuclear research reactor 0.5 to 3 MW

    International Nuclear Information System (INIS)

    1992-05-01

    This nuclear reactor has been designed for radioisotope production, basic and applied research in reactor physics and nuclear engineering, neutron-beam experimentation, irradiation of various materials and training of scientific and technical personnel. It is located in the 'Production Area' of the Nuclear Technology Center. It is equipped with the necessary facilities for large-scale production of radioisotopes to be used in medicine as well as for other scientific and industrial purposes. In addition, it has a Neutronography Facility and the required equipment to perform Neutron-Activation Analysis. It is an open pool-type reactor, moderated and cooled with light water, fuelled with 20% enriched uranium. Its reflector are graphite and water. It has plate-type fuel elements clad in aluminium. The reactor core is located near the bottom of the demineralized water pool. It includes fuel elements, reflector and sample-holding devices for materials to be irradiated. This kind of configuration, which is widely used in research reactors, provides a high degree of safety since it prevents the core from becoming exposed under any circumstance and does not require any cooling system during reactor shutdown. Power output is between 0.5 to 3 MW TH , with a minimum thermal neutron flux of approx, 10 13 n/cm 2 ·sec, at irradiation zone almost with no modifications. Heat extraction is achieved by means of a cooling circuit which comprises two circulation pumps and a plate-type heat exchanger. Final heat dissipation to the atmosphere is performed through another cooling circuit which includes two circulation pumps and a cooling tower. Reactor control is accomplished with five neutron-absorbing rods positioned by means of especially designed elements and governed by the reactor's instrumentation and control system. Should an abnormal situation arise, gravity causes the rods to fall automatically, thus extinguishing the nuclear reaction. The reactor building has a ventilation

  12. O arquipélago “literopintado”: escritura literária de autoria feminina em Cabo Verde

    Directory of Open Access Journals (Sweden)

    Simone Caputo Gomes

    2010-12-01

    Full Text Available Este artigo tem por objetivo estudar a representação de Cabo Verde pela literatura de autoria feminina, que retrata – lê, pinta, desenha, esculpe, escreve, imagina – suas belas paisagens, seu cotidiano popular, seus perfis de mulher, sua riqueza cultural.Palavras-chave: Literatura feminina; Cabo Verde; Representação cultural.

  13. Verde Valley Community Needs Assessment Project, Spring 1979.

    Science.gov (United States)

    Gose, Frank J.

    A study of the educational needs to be met by the Verde Campus of Yavapai College (YC) involved surveying seven populations. Responses were returned by 88 non-retired community residents, 96 retired members of the community, 191 members of the business sector, 240 current students, 208 former students, 19 faculty members, and 261 high school…

  14. IDEOLOGIA VERDE E O COMPORTAMENTO DO CONSUMIDOR TECNOLÓGICO: PREFERÊNCIA DE USO E JUSTIFICAÇÃO

    Directory of Open Access Journals (Sweden)

    Marina Lemos Barboza

    2014-04-01

    Full Text Available O presente artigo objetiva analisar o comportamento de consumo tecnológico, dado a justificação do valor verde integrado em dispositivos eletrônicos, do tipo smartphones e tablets. Com isto, foi realizado um estudo baseado na literatura de comportamento do consumidor, produtos verdes, ideologia verde, convergência tecnológica e preferência de uso por produtos tecnológicos, utilizando de pesquisa netnográfica como opção metodológica, a qual consiste da extração de informações de blogs/fóruns de discussões, realizando uma análise de conteúdo para as discussões coletadas, de forma a codificar e categorizar os grupos participantes deste argumento. Para complementar questionamentos que ficaram em abertos após a netnografia, foram feitas entrevistas com nove consumidores específicos por suas características de consumo, de forma a melhor compreender como fatores de marketing influenciam nestas decisões. Neste contexto, este estudo teve como resultado cinco categorias de consumidores identificados, com subcategorias implícitas. Este estudo observa e interpreta o ponto de vista do consumidor tecnológico, avaliando se a difusão dos produtos verdes (consumo sustentável ou com valores/atributos ecológicos, inseriu-se no contexto da sociedade atual, e se a discussão desta realidade mercadológica, apresenta consigo a inovação da consciência ecológica (verde, além da percepção de inovação tecnológica com a inserção do verde.

  15. Confort térmico en espacios verdes urbanos de ambientes áridos.

    OpenAIRE

    Alejandra Kurbán; Mario Cúnsulo

    2017-01-01

    En la planificación bioclimática de las ciudades y particularmente las ubicadas en  ambientes áridos, los espacios verdes representan un potencial  higrotérmico desaprovechado como mitigadores del clima urbano. El trabajo cuantifica el confort térmico de espacios verdes urbanos (EVU) de una ciudad del centro-oeste de Argentina localizada en la Diagonal Árida Sudamericana, a partir del Índice UTCI.  Este índice se calcula a partir de mediciones climáticas en 19 EVU, realizadas en el verano del...

  16. Single and multiple in-season measurements as indicators of at-harvest cotton boll damage caused by verde plant bug (Hemiptera: Miridae).

    Science.gov (United States)

    Brewer, Michael J; Armstrong, J Scott; Parker, Roy D

    2013-06-01

    The ability to monitor verde plant bug, Creontiades signatus Distant (Hemiptera: Miridae), and the progression of cotton, Gossypium hirsutum L., boll responses to feeding and associated cotton boll rot provided opportunity to assess if single in-season measurements had value in evaluating at-harvest damage to bolls and if multiple in-season measurements enhanced their combined use. One in-season verde plant bug density measurement, three in-season plant injury measurements, and two at-harvest damage measurements were taken in 15 cotton fields in South Texas, 2010. Linear regression selected two measurements as potentially useful indicators of at-harvest damage: verde plant bug density (adjusted r2 = 0.68; P = 0.0004) and internal boll injury of the carpel wall (adjusted r2 = 0.72; P = 0.004). Considering use of multiple measurements, a stepwise multiple regression of the four in-season measurements selected a univariate model (verde plant bug density) using a 0.15 selection criterion (adjusted r2 = 0.74; P = 0.0002) and a bivariate model (verde plant bug density-internal boll injury) using a 0.25 selection criterion (adjusted r2 = 0.76; P = 0.0007) as indicators of at-harvest damage. In a validation using cultivar and water regime treatments experiencing low verde plant bug pressure in 2011 and 2012, the bivariate model performed better than models using verde plant bug density or internal boll injury separately. Overall, verde plant bug damaging cotton bolls exemplified the benefits of using multiple in-season measurements in pest monitoring programs, under the challenging situation when at-harvest damage results from a sequence of plant responses initiated by in-season insect feeding.

  17. The heating operational summarization in three winters of a 5 MW test heating reactor

    International Nuclear Information System (INIS)

    Wang Dazhong; Dong Duo; Su Qingshan; Zhang Yajun

    1992-09-01

    The 5 MW THR (5 MW test heating reactor) is a new type reactor with inherent safety developed by INET (Institute of Nuclear Energy Technology). It is the first 'pressure vessel type' heating reactor in operation in the world. It was put into operation in November, 1989. Since then it has operated for three winter seasons. The total operation time has reached to 8174 hours and its availability of heating has reached to 99%. The advanced technology of this reactor has been proved in the past three years operation. The characteristics of power regulating, load following, reactivity disturbance and the variation of parameters under the condition of ATWS (anticipated transients without scram) were studied with experiments in 5 MW THR. The 5 MW THR is an ideal heating reactor and has outstanding performances

  18. Dynamic analysis of the condensate and of the feed water in the Laguna Verde nuclear power station; Analisis dinamico del sistema de condensado y agua de alimentacion de la nucleoelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Macedo Muth, Javier; Sandoval Pena, Ramon [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1988-12-31

    This article shows a non-lineal mathematical model for the condensate, and feed water systems and for feed water heater drains at the Laguna Verde Nuclear Power Station for its simulation in real time. The model allows the calculation of flows and pressures in all the piping system and equipment that integrate the systems. It was obtained by using the force unbalance in the fluid concept and is capable of reproducing its dynamic behavior through variations induced by the different operation modes and more common failures. The final model objective is to form part of the Laguna Verde simulator that will be used for operator training of this Nuclear Power Plant. [Espanol] En este articulo se muestra un modelo matematico no lineal de los sistemas de condensado, agua de alimentacion y drenes de calentadores de la central nuclear de Laguna Verde para su simulacion en tiempo real. El modelo permite calcular los flujos y las presiones en toda la red de tuberias y equipos que integran los sistemas. Se obtuvo utilizando el concepto de desbalance de fuerzas en el fluido, y es capaz de reproducir su comportamiento dinamico ante variaciones inducidas por los diversos modos de operacion y fallas mas comunes. El objetivo final del modelo es formar parte del simulador de Laguna Verde que se empleara para el adiestramiento de los operadores de dicha central nuclear.

  19. Preparo e caracterização de tinturas das folhas de chá verde [Camellia sinensis (L. O. Kuntze] Theaceae

    Directory of Open Access Journals (Sweden)

    C.B. Santos

    2014-12-01

    Full Text Available Tinturas preparadas com as folhas de Camellia sinensis (chá verde, foram caracterizadas visando a obtenção de extratos enriquecidos em polifenóis. As tinturas foram obtidas por meio de maceração estática da droga pulverizada, com diferentes misturas de 60, 70, 80 e 94,5% de etanol em água. Em seguida foram filtradas e, após 8 dias de extração, realizaram-se as analises: organoléptica, pH, densidade, determinação do resíduo seco, perfil cromatográfico por camada delgada, e teor de polifenóis. Os resultados demonstraram que o solvente (mistura hidroalcoólica a 60 ou 70% extraiu a maior quantidade de constituintes químicos do chá verde; também foi o mais seletivo ao extrair, especificamente os polifenóis. Estes dados sugerem que a utilização de álcool etílico a 60 ou 70% conduz à obtenção de tinturas mais ricas em polifenóis, a partir das folhas do chá verde (C. sinensis.

  20. An 40 Ar- 39 Ar study of the Cape Verde hot spot

    DEFF Research Database (Denmark)

    Holm, Paul Martin; Grandvuinet, Tanja; Wilson, James Richard

    2008-01-01

    The 40Ar-39Ar analyses of 28 groundmass separates from volcanic rocks from the islands of Santiago, Sal, and São Vicente, Cape Verde archipelago, are presented. The new age data record the volcanic evolution for Santiago from 4.6 to 0.7 Ma, for Sal from around 15 to 1.1 Ma, and for São Vicente from...... Cretaceous age for limestones deposited on the seafloor and later uplifted. The Cape Verde Rise is indicated to have fully formed in the early Miocene around 22 Ma, accompanied by the initial alkaline volcanism. Considerable volcanism on Sal, Boa Vista, and Maio took place in the Miocene and Pliocene...

  1. Verde Macael: A Serpentinite Wrongly Referred to as a Marble

    Directory of Open Access Journals (Sweden)

    Santiago del Barrio

    2013-02-01

    Full Text Available Serpentinites are used in both exterior and interior locations, but not all serpentinites are equal: they vary in physical-mechanical behavior and are not all suitable for similar uses. The serpentinites most commonly used worldwide come from India, Pakistan or Egypt. Spain has traditionally quarried two ultramafic massifs, one in Galicia (Verde Pirineos and one in Andalucía (Verde Macael. Some of these quarries were small family-run businesses. In both cases, these rocks are commercially available as “green marble.” These serpentinites commonly have a high degree of carbonation, but the process does not always take place with the same intensity. Carbonate can act as a cementing agent of the other phases, increasing the mechanical strength parameters. As a result, an improvement in the strength conditions is achieved, but a misinterpretation of the suitability of the rock may occur because a perception among users that “green marble” is similar to geologically defined marble. This may lead to inappropriate applications as an ornamental stone. At a time of economic crisis in Europe, the natural stone sector is encouraged to invest in research to identify the best quality products that can compete profitably with those currently being imported from other countries. This paper provides a comparison of properties of the Verde Macael serpentinite with a true marble in the hope of contributing to improving the natural stone industrial sector.

  2. Validation study of the reactor physics lattice transport code WIMSD-5B by TRX and BAPL critical experiments of light water reactors

    International Nuclear Information System (INIS)

    Khan, M.J.H.; Alam, A.B.M.K.; Ahsan, M.H.; Mamun, K.A.A.; Islam, S.M.A.

    2015-01-01

    Highlights: • To validate the reactor physics lattice code WIMSD-5B by this analysis. • To model TRX and BAPL critical experiments using WIMSD-5B. • To compare the calculated results with experiment and MCNP results. • To rely on WIMSD-5B code for TRIGA calculations. - Abstract: The aim of this analysis is to validate the reactor physics lattice transport code WIMSD-5B by TRX (thermal reactor-one region lattice) and BAPL (Bettis Atomic Power Laboratory-one region lattice) critical experiments of light water reactors for neutronics analysis of 3 MW TRIGA Mark-II research reactor at AERE, Dhaka, Bangladesh. This analysis is achieved through the analysis of integral parameters of five light water reactor critical experiments TRX-1, TRX-2, BAPL-UO 2 -1, BAPL-UO 2 -2 and BAPL-UO 2 -3 based on evaluated nuclear data libraries JEFF-3.1 and ENDF/B-VII.1. In integral measurements, these experiments are considered as standard benchmark lattices for validating the reactor physics lattice transport code WIMSD-5B as well as evaluated nuclear data libraries. The integral parameters of the said critical experiments are calculated using the reactor physics lattice transport code WIMSD-5B. The calculated integral parameters are compared to the measured values as well as the earlier published MCNP results based on the Chinese evaluated nuclear data library CENDL-3.0 for assessment of deterministic calculation. It was found that the calculated integral parameters give mostly reasonable and globally consistent results with the experiment and the MCNP results. Besides, the group constants in WIMS format for the isotopes U-235 and U-238 between two data files have been compared using WIMS library utility code WILLIE and it was found that the group constants are well consistent with each other. Therefore, this analysis reveals the validation study of the reactor physics lattice transport code WIMSD-5B based on JEFF-3.1 and ENDF/B-VII.1 libraries and can also be essential to

  3. Estudo prospectivo, duplo cego e cruzado da Camellia sinensis (chá verde nas dislipidemias Estudio prospectivo, doble ciego y cruzado de la Camellia sinensis (té verde en las dislipidemias Prospective double-blind crossover study of Camellia sinensis (green tea in dyslipidemias

    Directory of Open Access Journals (Sweden)

    Gesiani de Almeida Pierin Batista

    2009-08-01

    Full Text Available FUNDAMENTO: Estudos epidemiológicos estabeleceram uma associação entre dislipidemias e aterosclerose. A terapia nutricional é um ponto central da estratégia preventiva em indivíduos que apresentam fatores de risco para doença aterosclerótica. OBJETIVOS: Investigar os efeitos do chá verde (Camellia sinensis em pacientes portadores de dislipidemias. MÉTODOS: O estudo envolveu 33 pacientes, com idade entre 21 e 71 anos, que consumiam uma dieta com baixo teor de gorduras (25% a 35% das calorias totais e 200 mg de colesterol por dia. Foram randomizados para dois tratamentos sequenciais: cápsulas contendo 250 mg de extrato seco do chá verde ou placebo, administradas por um período total de 16 semanas, tendo cada paciente utilizado chá verde (Camellia sinensis por oito semanas e placebo em igual período. RESULTADOS: Os valores lipídicos basais (mg/dl foram os seguintes: HDL-colesterol 60,7 ± 7,3; colesterol total 255 ± 30,9; LDL-colesterol 158,8 ± 29,0; triglicerídeos 169,0 ± 61,3 e Apo-B 120,2 ± 18,9. As variações lipídicas médias, provocadas pelo uso do chá verde (Camellia sinensis, mostraram uma redução de 3,9 % (p = 0,006 nas concentrações do colesterol total e uma redução de 4,5 % (p = 0,026 do LDL-colesterol. A ingestão de chá verde não influenciou significativamente os níveis de HDL-colesterol, dos triglicerídeos e do Apo-B. Resultados não significativos foram observados na avaliação dos lipídeos sanguíneos (colesterol total e LDL-colesterol com o uso do placebo. CONCLUSÃO: Foi demonstrado o efeito benéfico do chá verde (Camellia sinensis, que reduziu significativamente, em oito semanas, os níveis de colesterol total e LDL-colesterol nesse grupo de pacientes.FUNDAMENTO: Estudios epidemiológicos establecieron una asociación entre dislipidemias y aterosclerosis. La terapia nutricional es un punto central de la estrategia preventiva en individuos que presentan factores de riesgo para enfermedad

  4. Paso del Aguilo : Jarre de type Rio Verde Poli

    OpenAIRE

    Michelet , Dominique

    1981-01-01

    Zone IV, site n°2. Las Colaciones, Paso del Aguila, municipio Armadillo, San Luis Potosi.Jarre à deux petites anses latérales sous le col, du type Rio Verde Poli. Engobe brun-beige poli. Hauteur totale 13 centimètres. Collection particulière Paso del Aguila.

  5. Optimal operating parameters of the reactor oscillator in the channel of 6.5/10 MW reactor; Odredjivanje optimalnih radnih tacaka za reaktorski oscilator u kanalu na reaktoru 6,5/10 MW

    Energy Technology Data Exchange (ETDEWEB)

    Lolic, B; Zecevic, V [The Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1961-07-01

    Operating conditions for the reactor oscillator in the central vertical experimental channel (VK5) in the RA reactor were studied during 1960. Channel VK5 was chosen because the sensitivity of the reactor is highest in this case. The central vertical experimental channel is placed in the center of the core and its bottom is placed 200 mm from the bottom of the reactor core. Diameter of the channel is is 110 mm and its length 5706 mm. During operation of the reactor oscillator with total modulation of the reactor power, it is very important to determine the oscillator operating point and the oscillation amplitude in such a way to avoid any change in reactor power level. Positive reactivity changes originating from oscillations of the samples should be compensated by the negative reactivity changes so that the effect should be nil. Operating points of the reactor oscillator are in the middle of the straight part of the figure showing the reactivity change dependent on the position of the absorber.

  6. Revestimentos biodegradaveis para conservação do coco 'anão verde'

    OpenAIRE

    Josane Maria Resende

    2007-01-01

    Resumo: A água de coco verde é extremamente perecível após a colheita dos frutos e sua qualidade está diretamente relacionada às condições do ambiente de armazenagem. Portanto, são necessárias tecnologias que permitam a conservação do coco verde por um período superior a trinta dias para que o fruto possa ser exportado e comercializado mantendo a água em condições apropriadas para o consumo ao natural. O presente trabalho teve o objetivo de desenvolver revestimentos biodegradáveis para prolon...

  7. Estimate of LOCA-FI plenum pressure uncertainty for a five-ring RELAP5 production reactor model

    International Nuclear Information System (INIS)

    Griggs, D.P.

    1993-03-01

    The RELAP5/MOD2.5 code (RELAP5) is used to perform best-estimate analyses of certain postulated Design Basis Accidents (DBAs) in SRS production reactors. Currently, the most limiting DBA in terms of reactor power level is an instantaneous double-ended guillotine break (DEGB) loss of coolant accident (LOCA). A six-loop RELAP5 K Reactor model is used to analyze the reactor system behavior dozing the Flow Instability (FI) phase of the LOCA, which comprises only the first 5 seconds following the DEGB. The RELAP5 K Reactor model includes tank and plenum nodalizations having five radial rings and six azimuthal sectors. The reactor system analysis provides time-dependent plenum and tank bottom pressures for use as boundary conditions in the FLOWTRAN code, which models a single fuel assembly in detail. RELAP5 also performs the system analysis for the latter phase of the LOCA, denoted the Emergency Cooling System (ECS) phase. Results from the RELAP analysis are used to provide boundary conditions to the FLOWTRAN-TF code, which is an advanced two-phase version of FLOWTRAN. The RELAP5 K Reactor model has been tested for LOCA-FI and Loss-of-Pumping Accident analyses and the results compared with equivalent analyses performed with the TRAC-PF1/MOD1 code (TRAC). An equivalent RELAP5 six-loop, five-ring, six-sector L Reactor model has been benchmarked against qualified single-phase system data from the 1989 L-Area In-Reactor Test Program. The RELAP5 K and L Reactor models have also been subjected to an independent Quality Assurance verification

  8. Near-field receiving water monitoring of trace metals and a benthic community near the Palo Alto Regional Water Quality Control Plant in south San Francisco Bay, California: 2014

    Science.gov (United States)

    Cain, Daniel J.; Thompson, Janet K.; Crauder, Jeff; Parcheso, Francis; Stewart, Robin; Kleckner, Amy E.; Dyke, Jessica; Hornberger, Michelle I.; Luoma, Samuel N.

    2015-01-01

    Trace-metal concentrations in sediment and in the clam Macoma petalum (formerly reported as Macoma balthica), clam reproductive activity, and benthic macroinvertebrate community structure were investigated in a mudflat 1 kilometer (km) south of the discharge of the Palo Alto Regional Water Quality Control Plant (PARWQCP) in South San Francisco Bay, Calif. This report includes the data collected by U.S. Geological Survey (USGS) scientists for the period January 2014 to December 2014. These append to long-term datasets extending back to 1974, and serve as the basis for the City of Palo Alto’s Near-Field Receiving Water Monitoring Program, initiated in 1994. 

  9. Groundwater resources of Ribeira Fajã basin, island of São Nicolau, Cape Verde, West Africa

    Science.gov (United States)

    Heilweil, Victor M.; Gingerich, Stephen B.; Plummer, Niel; Verstraeten, Ingrid M.

    2010-01-01

    Groundwater resources in Cape Verde provide water for agriculture, industry, and human consumption. These resources are limited and susceptible to contamination. Additional groundwater resources are needed for continued agricultural development, particularly during times of drought, but increased use and (or) climatic change may have adverse effects on the quantity and quality of freshwater available. In volcanic island aquifers such as those of Cape Verde, a lens of fresh groundwater typically ?floats? upon a layer of brackish water at the freshwater/saltwater boundary, and increased pumping may cause salt water intrusion or other contamination. A recent U.S. Geological Survey study assessed baseline groundwater conditions in watersheds on three islands of Cape Verde to provide the scientific basis for sustainably developing water resources and minimizing future groundwater depletion and contamination.

  10. Plant growth stage-specific injury and economic injury level for verde plant bug, Creontiades signatus (Hemiptera: Miridae), on cotton: effect of bloom period of infestation.

    Science.gov (United States)

    Brewer, Michael J; Anderson, Darwin J; Armstrong, J Scott

    2013-10-01

    Verde plant bugs, Creontiades signatus Distant (Hemiptera: Miridae), were released onto caged cotton, Cossypium hirsutum L., for a 1-wk period to characterize the effects of insect density and bloom period of infestation on cotton injury and yield in 2011 and 2012, Corpus Christi, TX. When plants were infested during early bloom (10-11 nodes above first white flower), a linear decline in fruit retention and boll load and a linear increase in boll injury were detected as verde plant bug infestation levels increased from an average of 0.5 to 4 bugs per plant. Lint and seed yield per plant showed a corresponding decline. Fruit retention, boll load, and yield were not affected on plants infested 1 wk later at peak bloom (8-9 nodes above first white flower), even though boll injury increased as infestation levels increased. Second-year testing verified boll injury but not yield loss, when infestations occurred at peak bloom. Incidence of cotton boll rot, known to be associated with verde plant bug feeding, was low to modest (verde plant bug were important contributors to yield decline, damage potential was greatest during the early bloom period of infestation, and a simple linear response best described the yield response-insect density relationship at early bloom. Confirmation that cotton after peak bloom was less prone to verde plant bug injury and an early bloom-specific economic injury level were key findings that can improve integrated pest management decision-making for dryland cotton, at least under low-rainfall growing conditions.

  11. Simulation of a scenario of total loss of external and internal power (Sbo) for different vent pressures of the containment of a BWR-5; Simulacion de un escenario de perdida total de potencia externa e interna (SBO) para distintas presiones de venteo de la contencion de un reactor BWR-5

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas V, J.; Mugica R, C. A.; Godinez S, V., E-mail: Jaime.cardenas@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan No. 779, Col. Narvarte, 03020 Mexico D. F. (Mexico)

    2014-10-15

    The simulation of a Station Black Out (Sbo) was realized with intervention of the vent containment by means of a rigid vent coming from the dry-well and that discharges directly to the atmosphere, with the MELCOR code version 2.1. This scenario was carried out for a BWR-5 and containment type Mark II, with a thermal power of 2317 MWt similar to the reactor of nuclear power plant of Laguna Verde. For this scenario was considered as only available system for coolant injection to the reactor to the Reactor Core Isolation Cooling (Rcic), which remained operating 4 hours with batteries bank. The Security and Relief Valves (SR V) were considered functional (by simplicity) and that they mechanically do not exceed their capacity to liberate pressure due to the performances in their safety way. The operator maneuver to perform the SR V and to de pressurize the vessel until the pressure (13 kg/cm{sup 2}) to operate the low pressure systems was modeled. The results cover approximately 48 hours (172000 seconds), time in which was observed the behavior of the level and pressure in the vessel. Also the scenario evolution was analyzed to different vent pressures of the primary containment (2.0, 3.0, 4.5, 6.0, and 10.0 kg/cm{sup 2}), the temperature profiles of the dry-well, the hydrogen accumulation in the containment, the radio-nuclides liberation through rigid vent to the atmosphere and the inventory of these. In this work an analysis of the pressure behavior in the primary containment is presented, with the purpose of minimizing liberated fission products to the environment. (Author)

  12. Development of Zr-2.5Nb pressure tubes for Advanced CANDU Reactor

    International Nuclear Information System (INIS)

    Bickel, G.A.; Griffiths, M.; Douchant, A.; Douglas, S.; Woo, O.T.; Buyers, A.

    2010-01-01

    In an Advanced CANDU Reactor (ACR), pressure tubes of cold-worked Zr-2.5Nb materials will be used in the reactor core to contain the fuel bundles and the light water coolant. They will be subjected to higher temperature, pressure and flux than that in a CANDU reactor. In order to ensure that these tubes will perform acceptably over their 30-year design life in such an environment, a manufacturing process has been developed to produce 6.5 mm thick ACR pressure tubes with optimized chemical composition, improved mechanical properties and in-reactor behaviour. The test and examination results show that, when compared with current in-service pressure tubes, the mechanical properties of ACR pressure tubes are significantly improved. Based on previous experience with CANDU reactor pressure tubes an assessment of the grain structure and texture indicates that the in-reactor creep deformation will be improved also. Analysis of the distribution of texture parameters from a trial batch of 26 tubes shows that the variability is reduced relative to tubes fabricated in the past. This reduction in variability together with a shift to a coarser grain structure will result in a reduction in diametral creep design limits and thus a longer economic life for the fuel channels of the advanced CANDU reactor. (author)

  13. Modernization of the turbo in the Laguna Verde Nuclear Power Plant; Modernizacion del turbogrupo en la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Liebana, B.; Merino, A.; Cobos, A.; Gonzalez, J. J.

    2010-07-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This paper describes the first phase of the project.

  14. Exponential-time constitutive law for Palo Duro Unit 4 Salt from the J. Friemel No. 1 Well

    International Nuclear Information System (INIS)

    Senseny, P.E.; Pfeifle, T.W.; Mellegard, K.D.

    1986-07-01

    Values for the nine parameters in the exponential-time constitutive law are presented for Palo Duro Unit 4 salt. The values given for the thermal expansion and two elastic parameters are taken from previous laboratory studies. The six remaining constitutive parameters are evaluated by analyzing data from 12 triaxial compression creep tests. The specimens tested in this study are from the J. Friemel No. 1 well in Deaf County, Texas. 15 refs., 15 figs., 4 tabs

  15. Red continua de espacios públicos verdes a escala municipal: el caso de Madrid

    OpenAIRE

    Casado Postigo, Pablo

    2015-01-01

    La ubicación marginal y el aislamiento de los Parques Urbanos implican infrautilización y deterioro de los mismos. Su interconexión mediante una red verde peatonal con limitaciones al tráfico rodado, supone una puesta en valor de todo el sistema de espacios libres y zonas verdes de la ciudad y un importante incentivo para desviar determinados flujos rodados a otras vías cercanas, rescatando así, espacios urbanos a favor del peatón. Esta conexión ayuda a minimizar la fragmentación del espacio ...

  16. Generation of the ECP database (ECP02.DAT) at the beginning of the cycle 1 of the Unit 1 of Laguna Verde; Generacion de la base ECP (ECP02.DAT) al inicio del ciclo 1 de la Unidad 1 de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Perusquia C, R. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1992-10-15

    In order to carrying out a comparison among the results provided for the Program of Estimate of the ECP Critical Position and the Shutdown/Startup produced in the Cycle 1 of the Unit 1 of Laguna Verde, it was generated the base of the ECP program, following the outlines settled down in the Procedure 'Generation of ECP Database for Laguna Verde' (IT.SN/DFR 074). Next the data sheets filled when being generated the ECP02.DAT database at the beginning of the cycle are provided. In the IT.SN/DFR 079 report 'Adjustment and Preliminary Evaluation of the Predictions of Criticity of the ECP Program with Reported Data of Cycle 1 of the Unit 1 of Laguna Verde, the results of the comparison among the estimates of the ECP program using the ECP02.DAT with the real data of the Cycle 1 of the Unit 1 of Laguna Verde are presented. (Author)

  17. ¿Qué tan verde es tu mercado?

    Directory of Open Access Journals (Sweden)

    Wilmar R. Olaya-González

    2011-01-01

    Full Text Available El mercado de lo verde y lo ecológico es una tendencia indiscutible en nuestro mundo globalizado, que busca de alguna manera resarcir el daño infringido sobre el medio ambiente. Más allá de simple altruismo, la ecología se ha convertido en una moda, de la cual unos y otros toman ventaja a su mejor acomodo, haciendo del mercado de productos y servicios su tribuna; eco-diseño, planes de responsabilidad social y ambiental, campañas por el reciclaje y consumo de productos "más amigables" con el medio ambiente hacen parte del panorama que se intenta describir en esta reseña. Por medio de un estudio de caso, se hará énfasis en cómo la comunicación asume un papel crucial en la verdadera apropiación del concepto de "consumidor verde" y "consumidor responsable", de manera que la propuesta transversal de las tic se convierta en una herramienta no solo tecnológica, sino también de empoderamiento del papel que la sociedad puede representar en el cuidado de los recursos naturales.

  18. Effective damping for SSR analysis of parallel turbine-generators

    International Nuclear Information System (INIS)

    Agrawal, B.L.; Farmer, R.G.

    1988-01-01

    Damping is a dominant parameter in studies to determine SSR problem severity and countermeasure requirements. To reach valid conclusions for multi-unit plants, it is essential that the net effective damping of unequally loaded units be known. For the Palo Verde Nuclear Generating Station, extensive testing and analysis have been performed to verify and develop an accurate means of determining the effective damping of unequally loaded units in parallel. This has led to a unique and simple algorithm which correlates well with two other analytic techniques

  19. TECHOS VERDES COMO SOLUCIÓN AL PROBLEMA DE INUNDACIONES EN MEDIOS URBANOS

    Directory of Open Access Journals (Sweden)

    López, N.

    2015-12-01

    Full Text Available El presente trabajo de investigación se realizó empleando modelos matemáticos, con la finalidad de comparar la escorrentía producida en un urbanismo con condiciones actuales de techos de tejas criollas, contra otro donde se usan estructuras o dispositivos de almacenamiento y retención de agua en casas, patios, parcelas, calles y contra urbanismos en general. Se seleccionó una zona de estudio en el Estado Lara (Venezuela, en el municipio Palavecino, en las inmediaciones de la Quebrada Tabure, considerando los techos verdes desde el punto de vista de reductores de escorrentía. Se elaboró una aplicación llamada “TechosVerdes.py” en el programa de licencia libre Python, con aproximadamente 4600 líneas de código para calcular los hidrogramas de los techos, patios, calles y áreas verdes, basándose en un mosaico creado con imágenes tipo raster en el programa Quantum Gis. La investigación se basó en la comparación directa de trece escenarios hipotéticos, donde se utilizó techos verdes y adicionalmente, tanques de almacenamiento y brocales, con un escenario original en condiciones actuales, sin alteraciones. Se obtuvo como resultado en los hidrogramas calculados para los escenarios hipotéticos, que el caudal pico disminuye, achatándose el hidrograma. This research was carried out using mathematical models in order to compare the runoff from an urban planning with handmade tiles roofs in actual conditions, with one where structures or storage devices and water retention in houses, yards are used, parcels, streets and housing complexes in general. A study area in the state of Lara, Venezuela, in Palavecino municipality, near Quebrada Tabure, was selected and green roofs are considered from the point of view of reducing runoff. An application called "TechosVerdes.py" was made under the license free Python program with approximately 4600 code lines was developed to calculate hydrographs from roofs, patios, streets and green areas

  20. Phylogenetic relationships of cone snails endemic to Cabo Verde based on mitochondrial genomes.

    Science.gov (United States)

    Abalde, Samuel; Tenorio, Manuel J; Afonso, Carlos M L; Uribe, Juan E; Echeverry, Ana M; Zardoya, Rafael

    2017-11-25

    Due to their great species and ecological diversity as well as their capacity to produce hundreds of different toxins, cone snails are of interest to evolutionary biologists, pharmacologists and amateur naturalists alike. Taxonomic identification of cone snails still relies mostly on the shape, color, and banding patterns of the shell. However, these phenotypic traits are prone to homoplasy. Therefore, the consistent use of genetic data for species delimitation and phylogenetic inference in this apparently hyperdiverse group is largely wanting. Here, we reconstruct the phylogeny of the cones endemic to Cabo Verde archipelago, a well-known radiation of the group, using mitochondrial (mt) genomes. The reconstructed phylogeny grouped the analyzed species into two main clades, one including Kalloconus from West Africa sister to Trovaoconus from Cabo Verde and the other with a paraphyletic Lautoconus due to the sister group relationship of Africonus from Cabo Verde and Lautoconus ventricosus from Mediterranean Sea and neighboring Atlantic Ocean to the exclusion of Lautoconus endemic to Senegal (plus Lautoconus guanche from Mauritania, Morocco, and Canary Islands). Within Trovaoconus, up to three main lineages could be distinguished. The clade of Africonus included four main lineages (named I to IV), each further subdivided into two monophyletic groups. The reconstructed phylogeny allowed inferring the evolution of the radula in the studied lineages as well as biogeographic patterns. The number of cone species endemic to Cabo Verde was revised under the light of sequence divergence data and the inferred phylogenetic relationships. The sequence divergence between continental members of the genus Kalloconus and island endemics ascribed to the genus Trovaoconus is low, prompting for synonymization of the latter. The genus Lautoconus is paraphyletic. Lautoconus ventricosus is the closest living sister group of genus Africonus. Diversification of Africonus was in allopatry

  1. Confort térmico en espacios verdes urbanos de ambientes áridos.

    Directory of Open Access Journals (Sweden)

    Alejandra Kurbán

    2017-06-01

    Full Text Available En la planificación bioclimática de las ciudades y particularmente las ubicadas en  ambientes áridos, los espacios verdes representan un potencial  higrotérmico desaprovechado como mitigadores del clima urbano. El trabajo cuantifica el confort térmico de espacios verdes urbanos (EVU de una ciudad del centro-oeste de Argentina localizada en la Diagonal Árida Sudamericana, a partir del Índice UTCI.  Este índice se calcula a partir de mediciones climáticas en 19 EVU, realizadas en el verano del año 2014. El valor de dicho índice en cada EVU se referencia con el calculado para su entorno urbano. El porcentaje de diferencia entre ellos permite agrupar el desempeño bioclimático de los EVU en cinco categorías en función de su divergencia con las condiciones climáticas generales de la ciudad. Los resultados permiten individualizar los parámetros arbóreos mínimos que deben poseer los EVU, como objetivo de una planificación bioclimática del verde urbano en ciudades de ambientes áridos.

  2. Marketing verde e práticas socioambientais nas indústrias do Paraná

    Directory of Open Access Journals (Sweden)

    Valéria Neder Lopes

    2014-03-01

    Full Text Available A preocupação das empresas com o meio ambiente e com todas as questões sociais envolvidas em seu processo tem se tornado uma constante nos últimos tempos. Devido a isso, estão surgindo novas formas de administrar os recursos disponíveis. Nesse contexto, enquadra-se o marketing verde que deve estar pautado em práticas ambientalmente corretas, com o intuito de gerar produtos e serviços mais sustentáveis, fortalecendo a imagem das empresas e diferenciando suas marcas no mercado. O intuito neste trabalho foi verificar se as grandes indústrias do Paraná estão se utilizando das práticas de marketing verde e se mantêm projetos de gestão socioambiental. Para atender a tais objetivos, elaborou-se uma pesquisa descritiva e quantitativa com 48 grandes empresas cadastradas na Federação das Indústrias do Paraná. Os resultados obtidos indicam que a maior parte das empresas possui departamento de marketing formalizado, mantém sistemas de gestão ambiental e utiliza moderadamente práticas de marketing verde.

  3. Organic geochemistry of deep ground waters from the Palo Duro Basin, Texas: implications for radionuclide complexation, ground-water origin, and petroleum exploration

    International Nuclear Information System (INIS)

    Means, J.L.; Hubbard, N.J.

    1985-05-01

    This report describes the organic geochemistry of 11 ground-water samples from the Palo Duro Basin, Texas and discusses the implications of their organic geochemical compositions in terms of radionuclide complexation, ground-water origin, and the petroleum potential of two candidate repository sites in Deaf Smith and Swisher Counties. Short-chain aliphatic acid anions are the principal organic constituents present. Stability constant data and simple chemical equilibria calculations suggest that short-chain aliphatic acids are relatively weak complexing agents. The extent of complexation of a typical actinide by selected inorganic ligands present in these brines is expected to far outweigh actinide complexation by the aliphatic acid anions. Various lines of evidence suggest that some portion of the bromide concentrations in the brines is derived from the same source as the short-chain aliphatic acid anions. When the postulated organic components are subtracted from total bromide concentrations, the origins of the Palo Duro brines, based on chloride versus bromide relationships, appear largely consistent with origins based on isotopic evidence. The short-chain aliphatic acid anion content of the Palo Duro brines is postulated to have been much greater in the geologic past. Aliphatic acid anions are but one of numerous petroleum proximity indicators, which consistently suggest a greater petroleum exploration potential for the area surrounding the Swisher County site than the region encompassing the candidate site in Deaf Smith County. Short-chain aliphatic acid anions appear to provide a useful petroleum exploration tool as long as the complex reactions that may dimish their concentrations in ground water are recognized. 71 refs., 10 figs., 10 tabs

  4. Analysis of the preliminary trajectory of emergency venting of the nuclear power plant of Laguna Verde using RELAP5

    International Nuclear Information System (INIS)

    Cecenas F, M.; Jimenez S, R.; Ovando C, R.; Tijerina S, F.; Tapia M, R. N.

    2016-09-01

    For a commercial nuclear plant, the availability of a vent line to the atmosphere is an improvement to achieve the prevention and mitigation of the consequences of a severe accident. The importance of this system received greater attention after the Fukushima accident in 2011. Subsequently, in 2012 and 2013, the United States Nuclear Regulatory Commission issued documents stating that the venting must be able to dislodge 1% of the rated thermal power of the core without over pressurizing the primary container. To analyze the venting of the nuclear power plant of Laguna Verde, the line and the primary container are modeled using the thermo-hydraulic code RELAP5, simulating a release of 1% of the nominal licensed power to the container in the form of saturated steam. The vent has no problem to evacuate the energy and manages to keep the container without exceeding its design limit, and the highest percentage of thermal power that can channel the vent to the outside is approximately 3%. A sensitivity analysis increasing the diameter of the line to 14 inches allows increasing in 10% the percentage of power that can be vented to the outside without problem for the containment. (Author)

  5. Priorização de práticas verdes em GSCM: estudo de casos com empresas da indústria do pêssego

    Directory of Open Access Journals (Sweden)

    Miguel Afonso Sellitto

    Full Text Available Resumo O objetivo deste artigo é definir prioridades para as práticas verdes que são observadas em cadeias de suprimentos da indústria do pêssego. O método de pesquisa é a modelagem qualiquantitativa. As unidades de análise são quatro empresas focais da cadeia de suprimentos da indústria do pêssego da região de Pelotas. Foi elaborado um modelo para estruturar práticas verdes observadas na indústria, a partir da literatura sobre GSCM (Gestão Verde da Cadeia de Suprimento. O modelo inclui três construtos: Estratégia, Inovação e Operações. Dezesseis práticas verdes presentes na literatura foram distribuídas entre os construtos. Um grupo focado de três especialistas adaptou o modelo à indústria do pêssego de Pelotas, eliminando três práticas. As restantes foram priorizadas por gestores das empresas com apoio do método AHP de análise multicriterial. Com base no resultado, cinco práticas foram consideradas prioritárias para a indústria: Ecodesign, Cooperação, Avaliação de Desempenho, Compras Verdes e Manufatura Verde, nesta ordem.

  6. Thermal hydraulic analysis of the IPR-R1 TRIGA research reactor using a RELAP5 model

    International Nuclear Information System (INIS)

    Costa, Antonella L.; Reis, Patricia Amelia L.; Pereira, Claubia; Veloso, Maria Auxiliadora F.; Mesquita, Amir Z.; Soares, Humberto V.

    2010-01-01

    The RELAP5 code is widely used for thermal hydraulic studies of commercial nuclear power plants. Current investigations and code adaptations have demonstrated that the RELAP5 code can be also applied for thermal hydraulic analysis of nuclear research reactors with good predictions. Therefore, as a contribution to the assessment of RELAP5/MOD3.3 for research reactors analysis, this work presents steady-state and transient calculation results performed using a RELAP5 model to simulate the IPR-R1 TRIGA research reactor at 50 kilowatts (kW) of power operation. The reactor is located in the Nuclear Technology Development Center (CDTN), Brazil. It is a 250 kW, light water moderated and cooled, graphite-reflected, open pool type research reactor. The development and the assessment of a RELAP5 model for the IPR-R1 TRIGA are presented. Experimental data were considered in the process of the RELAP5 model validation. The RELAP5 results were also compared with calculated data from the STHIRP-1 (Research Reactors Thermal Hydraulic Simulation) code. The results obtained have shown that the RELAP5 model for the IPR-R1 TRIGA reproduces the actual steady-state reactor behavior in good agreement with the available data.

  7. Improving Access to Pediatric Cardiology in Cape Verde via a Collaborative International Telemedicine Service.

    Science.gov (United States)

    Lapão, Luís Velez; Correia, Artur

    2015-01-01

    This paper addresses the role of international telemedicine services in supporting the evacuation procedures from Cape Verde to Portugal, enabling better quality and cost reductions in the management of the global health system. The Cape Verde, as other African countries, health system lacks many medical specialists, like pediatric cardiologists, neurosurgery, etc. In this study, tele-cardiology shows good results as diagnostic support to the evacuation decision. Telemedicine services show benefits while monitoring patients in post-evacuation, helping to address the lack of responsive care in some specialties whose actual use will help save resources both in provision and in management of the evacuation procedures. Additionally, with tele-cardiology collaborative service many evacuations can be avoided whereas many cases will be treated and followed locally in Cape Verde with remote technical support from Portugal. This international telemedicine service enabled more efficient evacuations, by reducing expenses in travel and housing, and therefore contributed to the health system's improvement. This study provides some evidence of how important telemedicine really is to cope with both the geography and the shortage of physicians.

  8. FOTOCATÁLISIS HETEROGÉNEA CON TIO2 PARA EL TRATAMIENTO DE DESECHOS LÍQUIDOS CON PRESENCIA DEL INDICADOR VERDE DE BROMOCRESOL Heterogeneous Photocatalysis with TIO2 for Liquid Wastes Treatment with Presence of the Bromocresol Green Indicator

    Directory of Open Access Journals (Sweden)

    Carolay Yaneth Guarín Llanes

    2011-12-01

    Full Text Available La fotocatálisis heterogénea es un proceso avanzado de oxidación que se aplica en este trabajo para determinar la degradación y mineralización del indicador verde bromocresol, presente en desechos líquidos de laboratorios de análisis químico y ambiental, comúnmente generados en universidades. En el tratamiento se empleó dióxido de titanio Degussa P-25 como catalizador, un reactor tipo Batch, y radiación UV artificial con una longitud de onda de 360 nm. La degradación se cuantificó por espectrofotometría UV-visible, y la mineralización se evaluó por el parámetro de DQO. Las condiciones óptimas de tratamiento para los desechos son: 260 ppm de TiO2 y un tiempo de retención de 60 minutos, con las que se obtuvo una degradación de 84,10% y una mineralización de 82.5 %. Los resultados obtenidos muestran que el proceso de fotocatálisis heterogénea puede ser útil en el tratamiento de efluentes que tenga la presencia del indicador verde de bromocresol.Heterogeneous photocatalysis is an advanced oxidation process applied to this kind of work for determining degradation and mineralization of the Bromocresol Green indicator present in chemical and environmental analysis laboratory liquid wastes, commonly generated in universities. Degussa P-25 titanium dioxide is used in the treatment as a catalyzer, as well as a batch-type reactor, and artificial UV radiation with a 360 nm wavelength. Degradation was quantified by UV-visible spectrophotometry and mineralization was evaluated through the DQO parameter. Optimal conditions of treatment for wastes are: 260 ppm TiO2 and a retention time of 60 minutes; degradation was 84.10% and mineralization was 82.5%. Results obtained show that the heterogeneous photocatalysis process can be useful for treatment of effluents with presence of the Bromocresol Green indicator.

  9. Negative sequence relay applied to generator 1 of the Laguna Verde nuclear power plant; Aplicacion de un relevador de secuencia negativa en el generador 1 de la central de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Diaz de la Serna P, Enrique [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1988-12-31

    The rotor of a synchronous generator can be dangerously heated in a short time by stator current unbalance, therefore it must be protected with a specific relay. This article discusses the protection and the adjustments selected for Unit 1 of the Comision Federal de Electricidad Laguna Verde Nuclear Nuclear Power Station. [Espanol] El rotor de un generador sincrono puede calentarse peligrosamente en un tiempo corto debido a desbalance de corrientes en el estator, por lo que debe protegerse con un relevador especifico. En este articulo se describen la proteccion y los ajustes seleccionados para la unidad 1, de la central nucleoelectrica Laguna Verde de la Comision Federal de Electricidad.

  10. Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt); Modelado del ciclo de vapor de Laguna Verde con el codigo PEPSE a condiciones de potencia termica actualmente licenciada (2027 MWt)

    Energy Technology Data Exchange (ETDEWEB)

    Castaneda G, M. A.; Maya G, F.; Medel C, J. E.; Cardenas J, J. B.; Cruz B, H. J.; Mercado V, J. J., E-mail: miguel.castaneda01@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Veracruz (Mexico)

    2011-11-15

    By means of the use of the performance evaluation of power system efficiencies (PEPSE) code was modeled the vapor cycle of the nuclear power station of Laguna Verde to reproduce the nuclear plant behavior to conditions of thermal power, licensed at present (2027 MWt); with the purpose of having a base line before the implementation of the project of extended power increase. The model of the gauged vapor cycle to reproduce the nuclear plant conditions makes use of the PEPSE model, design case of the vapor cycle of nuclear power station of Laguna Verde, which has as main components of the model the great equipment of the vapor cycle of Laguna Verde. The design case model makes use of information about the design requirements of each equipment for theoretically calculating the electric power of exit, besides thermodynamic conditions of the vapor cycle in different points. Starting from the design model and making use of data of the vapor cycle measured in the nuclear plant; the adjustment factors were calculated for the different equipment s of the vapor cycle, to reproduce with the PEPSE model the real vapor cycle of Laguna Verde. Once characterized the model of the vapor cycle of Laguna Verde, we can realize different sensibility studies to determine the effects macros to the vapor cycle by the variation of certain key parameters. (Author)

  11. Solution to the incompatibility between reactor protection logic and turbine shot logic. Scram by high pressure; Solucion a la incompatibilidad entre logica de proteccion de reactor y logica de disparo de turbina. SCRAM por alta presion

    Energy Technology Data Exchange (ETDEWEB)

    Ramos Q, R.; Santiago F, C.; Gonzalez P, G., E-mail: ruben.ramos01@cfe.gob.mx [Comision Federal de Electricidad, Central Nuclear Laguna Verde, Subgerencia de Ingenieria, Carretera Cardel-Nautla Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2013-10-15

    The nuclear power plant of Laguna Verde carried out the Modernization and Increase of Extended Power Project in its two Units (2005-2011). This modernization included to the electro-hydraulic control system of the main turbine, replacing an ana logical system by one digital (Digital Electro-hydraulic Control - DEHC) whose functions are of controlling the reactor pressure in the different operation ways as wells as of controlling the velocity and load of the main turbine. Also, it has protections that are related with diverse plant systems, as the Reactor Protection Systems (RPS). During the tests stage was realized a programmed load rejection, which Reactor Scram should cause when being presented the shot of main turbine. However, the logic of the RPS was inhibited due to the quick response of the new control DEHC, propitiating a condition of non prospective plant and, in consequence, the Reactor Scram happened for another protection of the RPS. (author)

  12. Multivariate analysis in the frequency mastery applied to the Laguna Verde Central; Analisis multivariable en el dominio de la frecuencia aplicado a la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Castillo D, R.; Ortiz V, J. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico); Calleros M, G. [CFE, Central Nucleoelectrica de Laguna Verde, carretera Nautla-Cardel Km. 42.5, Alto Lucero, Veracruz (Mexico)]. e-mail: rcd@nuclear.inin.mx

    2006-07-01

    The noise analysis is an auxiliary tool in the detection of abnormal operation conditions of equipment, instruments or systems that affect to the dynamic behavior of the reactor. The spectral density of normalized power has usually been used (NPSD, by its initials in English), to watch over the behavior of some components of the reactor, for example, the jet pumps, the recirculation pumps, valves of flow control in the recirculation knots, etc. The behavior change is determined by individual analysis of the NPSD of the signals of the components in study. An alternative analysis that can allow to obtain major information on the component under surveillance is the multivariate autoregressive analysis (MAR, by its initials in English), which allows to know the relationship that exists among diverse signals of the reactor systems, in the time domain. In the space of the frequency, the relative contribution of power (RPC for their initials in English) it quantifies the influence of the variables of the systems on a variable of interest. The RPC allows, therefore that for a peak shown in the NPSD of a variable, it can be determine the influence from other variables to that frequency of interest. This facilitates, in principle, the pursuit of the important physical parameters during an event, and to study their interrelation. In this work, by way of example of the application of the RPC, two events happened in the Laguna Verde Central are analyzed: the rods blockade alarms by high scale in the monitors of average power, in which it was presents a power peak of 12% of width peak to peak, and the power oscillations event. The main obtained result of the analysis of the control rods blockade alarm event was that it was detected that the power peak observed in the signals of the average power monitors was caused by the movement of the valve of flow control of recirculation of the knot B. In the other oscillation event the results its show the mechanism of the oscillation of

  13. Impact of flow induced vibration acoustic loads on the design of the Laguna Verde Unit 2 steam dryer

    International Nuclear Information System (INIS)

    Forsyth, D. R.; Wellstein, L. F.; Theuret, R. C.; Han, Y.; Rajakumar, C.; Amador C, C.; Sosa F, W.

    2015-09-01

    Industry experience with Boiling Water Reactors (BWRs) has shown that increasing the steam flow through the main steam lines (MSLs) to implement an extended power up rate (EPU) may lead to amplified acoustic loads on the steam dryer, which may negatively affect the structural integrity of the component. The source of these acoustic loads has been found to be acoustic resonance of the side branches on the MSLs, specifically, coupling of the vortex shedding frequency and natural acoustic frequency of safety relief valves (SRVs). The resonance that results from this coupling can contribute significant acoustic energy into the MSL system, which may propagate upstream into the reactor pressure vessel steam dome and drive structural vibration of steam dryer components. This can lead to high-cycle fatigue issues. Lock-in between the vortex shedding frequency and SRV natural frequency, as well as the ability for acoustic energy to propagate into the MSL system, are a function of many things, including the plant operating conditions, geometry of the MSL/SRV junction, and placement of SRVs with respect to each other on the MSLs. Comision Federal de Electricidad and Westinghouse designed, fabricated, and installed acoustic side branches (ASBs) on the MSLs which effectively act in the system as an energy absorber, where the acoustic standing wave generated in the side-branch is absorbed and dissipated inside the ASB. These ASBs have been very successful in reducing the amount of acoustic energy which propagates into the steam dome. In addition, modifications to the Laguna Verde Nuclear Power Plant Unit 2 steam dryer have been completed to reduce the stress levels in critical locations in the dryer. The objective of this paper is to describe the acoustic side branch concept and the design iterative processes that were undertaken at Laguna Verde Unit 2 to achieve a steam dryer design that meets the guidelines of the American Society of Mechanical Engineers, Boiler and Pressure

  14. Impact of flow induced vibration acoustic loads on the design of the Laguna Verde Unit 2 steam dryer

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, D. R.; Wellstein, L. F.; Theuret, R. C.; Han, Y.; Rajakumar, C. [Westinghouse Electric Company LLC, Cranberry Township, PA 16066 (United States); Amador C, C.; Sosa F, W., E-mail: forsytdr@westinghouse.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km 42.5 Carretera Cardel-Nautla, 91680 Alto Lucero, Veracruz (Mexico)

    2015-09-15

    Industry experience with Boiling Water Reactors (BWRs) has shown that increasing the steam flow through the main steam lines (MSLs) to implement an extended power up rate (EPU) may lead to amplified acoustic loads on the steam dryer, which may negatively affect the structural integrity of the component. The source of these acoustic loads has been found to be acoustic resonance of the side branches on the MSLs, specifically, coupling of the vortex shedding frequency and natural acoustic frequency of safety relief valves (SRVs). The resonance that results from this coupling can contribute significant acoustic energy into the MSL system, which may propagate upstream into the reactor pressure vessel steam dome and drive structural vibration of steam dryer components. This can lead to high-cycle fatigue issues. Lock-in between the vortex shedding frequency and SRV natural frequency, as well as the ability for acoustic energy to propagate into the MSL system, are a function of many things, including the plant operating conditions, geometry of the MSL/SRV junction, and placement of SRVs with respect to each other on the MSLs. Comision Federal de Electricidad and Westinghouse designed, fabricated, and installed acoustic side branches (ASBs) on the MSLs which effectively act in the system as an energy absorber, where the acoustic standing wave generated in the side-branch is absorbed and dissipated inside the ASB. These ASBs have been very successful in reducing the amount of acoustic energy which propagates into the steam dome. In addition, modifications to the Laguna Verde Nuclear Power Plant Unit 2 steam dryer have been completed to reduce the stress levels in critical locations in the dryer. The objective of this paper is to describe the acoustic side branch concept and the design iterative processes that were undertaken at Laguna Verde Unit 2 to achieve a steam dryer design that meets the guidelines of the American Society of Mechanical Engineers, Boiler and Pressure

  15. RELAP5-3D code validation of RBMK-1500 reactor reactivity measurement transients

    International Nuclear Information System (INIS)

    Kaliatka, Algirdas; Bubelis, Evaldas; Uspuras, Eugenijus

    2003-01-01

    This paper deals with the modeling of transients taking place during the measurements of the void and fast power reactivity coefficients performed at Ignalina NPP. The simulation of these transients was performed using RELAP5-3D code model of RBMK-1500 reactor. At the Ignalina NPP void and fast power reactivity coefficients are measured on a regular basis and, based on the total reactor power, reactivity, control and protection system control rods positions and the main circulation circuit parameter changes during the experiments, the actual values of these reactivity coefficients are determined. Following the simulation of the two above mentioned transients with RELAP5-3D code, a conclusion was made that the obtained calculation results demonstrate reasonable agreement with Ignalina NPP measured data. Behaviors of the separate MCC thermal-hydraulic parameters as well as physical processes are predicted reasonably well to the real processes, occurring in the primary circuit of RBMK-1500 reactor. The calculated reactivity and the total reactor core power behavior in time are also in reasonable agreement with the measured plant data. Despite of the small differences, RELAP5-3D code predicts reactivity and the total reactor core power behavior during the transients in a reasonable manner. Reasonable agreement of the measured and the calculated total reactor power change in time demonstrates the correct modeling of the neutronic processes taking place in RBMK-1500 reactor core

  16. From introduced American weed to Cape Verde Islands endemic: the case of Solanum rigidum Lam. (Solanaceae, Solanum subgenus Leptostemonum).

    Science.gov (United States)

    Knapp, Sandra; Vorontsova, Maria S

    2013-01-01

    A Solanum species long considered an American introduction to the Cape Verde Islands off the west coast of Africa is identified as Solanum rigidum, a member of the Eggplant clade of Old World spiny solanums (Solanum subgenus Leptostemonum) and is probably endemic to the Cape Verde Islands. Collections of this species from the Caribbean are likely to have been introduced from the Cape Verde Islands on slave ships. We discuss the complex nomenclatural history of this plant and provide a detailed description, illustration and distribution map. The preliminary conservation status of Solanum rigidum is Least Concern, but needs to be reassessed in light of its endemic rather than introduced status.

  17. Groundwater resources of Ribeira Paúl basin, island of Santo Antão, Cape Verde, West Africa

    Science.gov (United States)

    Heilweil, Victor M.; Gingerich, Stephen B.; Verstraeten, Ingrid M.

    2010-01-01

    Groundwater resources in Cape Verde provide water for agriculture, industry, and human consumption. These resources are limited and susceptible to contamination. Additional groundwater resources are needed for continued agricultural development, particularly during times of drought, but increased use and (or) climatic change may have adverse effects on the quantity and quality of freshwater available. In volcanic island aquifers such as those of Cape Verde, a lens of fresh groundwater typically ?floats? upon a layer of brackish water at the freshwater/saltwater boundary, and increased pumping may cause salt water intrusion or other contamination. A recent U.S. Geological Survey study assessed baseline groundwater conditions in watersheds on three islands of Cape Verde to provide the scientific basis for sustainably developing water resources and minimizing future groundwater depletion and contamination.

  18. Tree species effects on pathogen-suppressive capacities of soil bacteria across two tropical dry forests in Costa Rica.

    Science.gov (United States)

    Becklund, Kristen; Powers, Jennifer; Kinkel, Linda

    2016-11-01

    Antibiotic-producing bacteria in the genus Streptomyces can inhibit soil-borne plant pathogens, and have the potential to mediate the impacts of disease on plant communities. Little is known about how antibiotic production varies among soil communities in tropical forests, despite a long history of interest in the role of soil-borne pathogens in these ecosystems. Our objective was to determine how tree species and soils influence variation in antibiotic-mediated pathogen suppression among Streptomyces communities in two tropical dry forest sites (Santa Rosa and Palo Verde). We targeted tree species that co-occur in both sites and used a culture-based functional assay to quantify pathogen-suppressive capacities of Streptomyces communities beneath 50 focal trees. We also measured host-associated litter and soil element concentrations as potential mechanisms by which trees may influence soil microbes. Pathogen-suppressive capacities of Streptomyces communities varied within and among tree species, and inhibitory phenotypes were significantly related to soil and litter element concentrations. Average proportions of inhibitory Streptomyces in soils from the same tree species varied between 1.6 and 3.3-fold between sites. Densities and proportions of pathogen-suppressive bacteria were always higher in Santa Rosa than Palo Verde. Our results suggest that spatial heterogeneity in the potential for antibiotic-mediated disease suppression is shaped by tree species, site, and soil characteristics, which could have significant implications for understanding plant community composition and diversity in tropical dry forests.

  19. PARTICIPACIÓN DEL NITRÓGENO DE LOS ABONOS VERDES EN LA NUTRICIÓN NITROGENADA DEL MAÍZ (Zea mays L.) CULTIVADO SOBRE SUELO FERRALÍTICO ROJO

    OpenAIRE

    Gloria M. Martín; R. Rivera

    2002-01-01

    El presente trabajo se realizó con el objetivo de estudiar la eficiencia del nitrógeno incorporado con los abonos verdes, utilizados como precedente en el cultivo del maíz en un suelo Ferralítico Rojo de La Habana. Para ello, se estudió el grado de participación de diferentes fuentes de nitrógeno (abonos verdes y fertilizante mineral) en la nutrición nitrogenada del maíz, mediante los métodos isotópico y de las diferencias. El experimento se condujo en condiciones de macetas (5 kg) y se estud...

  20. Considerations for increasing unit 1 spent fuel pool capacity at the Laguna Verde station

    International Nuclear Information System (INIS)

    Vera, A.

    1992-01-01

    To increase the spent fuel storage capacity at the Laguna Verde Station in a safe and economical manner and assure a continuous operation of the first Mexican Nuclear Plant, Comision Federal de Electricidad (CFE), the Nation's Utility, seeked alternatives considering the overall world situation, the safety and licensing aspects, as well as the economics and the extent of the nuclear program of Mexico. This paper describes the alternatives considered, their evaluation and how the decision taken by CFE in this field, provides the Laguna Verde Station with a maximum of 37 years storage capacity plus full core reserve

  1. Robotic dismantlement systems at the CP-5 reactor D and D project

    International Nuclear Information System (INIS)

    Seifert, L. S.

    1998-01-01

    The Chicago Pile 5 (CP-5) Research Reactor Facility is currently undergoing decontamination and decommissioning (D and D) at the Argonne National Laboratory (ANL) Illinois site. CP-5 was the principle nuclear reactor used to produce neutrons for scientific research at Argonne from 1954 to 1979. The CP-5 reactor was a heavy-water cooled and moderated, enriched uranium-fueled reactor with a graphite reflector. The CP-5 D and D project includes the disassembly, segmentation and removal of all the radioactive components, equipment and structures associated with the CP-5 facility. The Department of Energy's Robotics Technology Development Program and the Federal Energy Technology Center, Morgantown Office provided teleoperated, remote systems for use in the dismantlement of the CP-5 reactor assembly for tasks requiring remote dismantlement as part of the EM-50 Large-Scale Demonstration Program (LSDP). The teleoperated systems provided were the Dual Arm Work Platform (DAWP), the Rosie Mobile Teleoperated Robot Work System (ROSIE), and a remotely-operated crane control system with installed swing-reduction control system. Another remotely operated apparatus, a Brokk BM250, was loaned to ANL by the Princeton Plasma Physics Laboratory (PPPL). This machine is not teleoperated and was not part of the LSDP, but deserves some mention in this discussion. The DAWP is a robotic dismantlement system that includes a pair of Schilling Robotic Systems Titan III hydraulic manipulator arms mounted to a specially designed support platform: a hydraulic power unit (HPU) and a remote operator console. The DAWP is designed to be crane-suspended for remote positioning. ROSIE, developed by RedZone Robotics, Inc. is a mobile, electro-hydraulic, omnidirectional platform with a heavy-duty telescoping boom mounted to the platform's deck. The work system includes the mobile platform (locomotor), a power distribution unit (PDU) and a remote operator console. ROSIE moves about the reactor building

  2. Cape Verde: Marketing Good Governance Kap Verde: Die Vermarktung von Good Governance

    Directory of Open Access Journals (Sweden)

    Bruce Baker

    2009-01-01

    Full Text Available Faced with a lack of natural resources Cape Verde has made good governance one of its most marketable products. Running parallel to the institutionalisation of democratic politics there has been an overhaul and growing sophistication in public administration, though certain weaknesses persist. This report argues that it is reform and improvement in this area in particular that has enabled this small island state to punch above its weight and achieve remarkable social, economic and political results. But will the successful formula of the past decade prove sufficient for the future? Poverty and unemployment have by no means been conquered. Much of the economic growth has been based in the tourist sector and the government is well aware of the dangers of over-reliance on a single industry. Cape Verde’s midway location between South America and Europe and its increasing international transport connections will continue to offer advantages to drug traffickers. The next few years of the world financial crisis will show whether marketing good governance is enough and whether this is the model for small resource developing states. Der Inselstaat Kap Verde hat seine Anstrengungen zu guter Regierungsführung (Good Governance erfolgreich demonstriert. Parallel zur Institutionalisierung demokratischer Regierungsstrukturen wurde die Verwaltung reformiert und modernisiert, wenn auch immer noch Problembereiche erkennbar sind. Der Autor sieht insbesondere in den politischen und administrativen Reformen den Hintergrund für die erfolgreiche soziale, wirtschaftliche und politische Entwicklung dieser kleinen Inselrepublik. Aber wird dieses Rezept, das im vergangenen Jahrzehnt seine Wirksamkeit beweisen konnte, auch in Zukunft ausreichend sein? Armut und Unterbeschäftigung sind keineswegs besiegt. Ein Großteil des Wirtschaftswachstums basiert auf dem Tourismussektor; die Regierung ist sich der Gefahr wohl bewusst, die in zu großer Abhängigkeit von einem

  3. Zoanthids of the Cape Verde Islands and their symbionts: previously unexamined diversity in the Northeastern Atlantic

    OpenAIRE

    Reimer, J.D.; Hirose, M.; Wirtz, P.

    2010-01-01

    The marine invertebrate fauna of the Cape Verde Islands contains many endemic species due to their isolated location in the eastern Atlantic, yet research has not been conducted on most taxa here. One such group are the zoanthids or mat anemones, an order of benthic cnidarians (Hexacorallia: Zoantharia) common in many marine environments. In this study, the diversity of zoanthids in the Cape Verde Islands is specifically examined for the first time. Field images and sampling are combined with...

  4. MCTP, a code for the thermo-mechanical analysis of a fuel rod of BWR type reactors (Neutron part); MCTP, un codigo para el analisis termo-mecanico de una barra combustible de reactores tipo BWR (Parte Neutronica)

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez L, H; Ortiz V, J [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2003-07-01

    In the National Institute of Nuclear Research of Mexico a code for the thermo-mechanical analysis of the fuel rods of the BWR type reactors of the Nucleo electric Central of Laguna Verde is developed. The code solves the diffusion equation in cylindrical coordinates with several energy groups. The code, likewise, calculates the temperature distribution and power distribution in those fuel rods. The code is denominated Multi groups With Temperatures and Power (MCTP). In the code, the energy with which the fission neutrons are emitted it is divided in six groups. They are also considered the produced perturbations by the changes in the temperatures of the materials that constitute the fuel rods, the content of fission products, the uranium consumption and in its case the gadolinium, as well as the plutonium production. In this work there are present preliminary results obtained with the code, using data of operation of the Nucleo electric Central of Laguna Verde. (Author)

  5. Amount and nature of occluded water in bedded salt, Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Fisher, R.S.

    1987-01-01

    The quantity and types of fluids within bedded salt cores from the Permian San Andres Formation, Palo Duro, Texas, were evaluated at the Texas Bureau of Economic Geology. Bedded halite from the San Andres Formation and other salt-bearing units were selected to represent the variety of salt types present, and were then analyzed. The mean water content of ''pure'' samples (more than 90% halite) is 0.4 weight percent, with none observed greater than 1.0 weight percent. Samples that contain more than 10 weight percent clay or mudstone display a trend of increasing water content with increasing clastic material. Chaotic mudstone-halite samples have as much as 5 weight percent water; halite-cemented mudstone interlayers, common throughout the bedded salts, may have water content values as high as 10 to 15 weight percent based on extrapolation of existing data that range from 0 to about 6%. No significant difference exists between the mean water content values of ''pure salt'' from the upper San Andres, lower San Andres Cycle 5, and lower San Andres Cycle 4 salt units. The fraction of total water present as mobile intergranular water is highly variable and not readily predicted from observed properties of the salt sample. The amount of water that would be affected by a high-level nuclear waste repository can be estimated if the volume of halite, the volume of clastic interlayers, and the amount and type of impurity in halite are known. Appendix contains seven vugraphs

  6. Grãos defeituosos em café colhido verde Occurrence of commercial defective coffee beans in unripe fruits

    Directory of Open Access Journals (Sweden)

    A. A. Teixeira

    1971-01-01

    Full Text Available Frutos de café Mundo Novo, colhidos verdes, após o benefício, foram analisados quanto aos defeitos comerciais que apresentaram. A classificação foi efetuada independentemente, por três classificadores, com a contagem de grãos "normais" e daqueles considerados defeitos, isto é, "verde" (três categorias, "ardido" e "prêto". Notou-se uma elevada porcentagem de grãos normais quanto à coloração, e também a ocorrência de grãos dos tipos "ardido" e "prêto", no café não maduro. Com a remoção da película prateada verificou-se uma redução na porcentagem de grãos "verdes" e um acentuado aumento na porcentagem de grãos "ardidos", e um aumento menor na de grãos "normais" e "prêtos". Estas observações indicam que os grãos normalmente classificados no comércio como "verdes" devem esta característica à côr .anormal da película, e que os grãos "ardidos" têm, como uma das suas origens, a colheita de frutos verdes.The frequency of defective coffee beans was determined in samples of unripe fruits of the cultivar Mundo Novo (Coffea arabica.Ten samples of 1000 seeds each obtained from green fruits after sundrying and shelling were independently scored for the commercial defects by three coffee classifiers. Each one of the classifiers recorded the occurrence of green-coated, brown and black beans before and after removal of the silver skin. The data revealed that more than half of the beans had normal green color whereas 44.9 per cent were green-coated, 3.5 per cent were brown and 0.1 per cent were black beans. The removal of the silver skin affected the previous classification giving 59.7 per cent of normal green beans, 39.5 per cent of brown and 0.3 per cent of black beans. These observations indicated that the so-called green-coated beans are caused by the presence of the silver skin which retains green pigments probably chlorophyll. On the other hand the browns which have been considered as product of over-fermentation were

  7. Using largest Lyapunov exponent to confirm the intrinsic stability of boiling water reactors

    International Nuclear Information System (INIS)

    Gavilian-Moreno, Carlos; Espinosa-Paredes, Gilberto

    2016-01-01

    The aim of this paper is the study of instability state of boiling water reactors with a method based in largest Lyapunov exponents (LLEs). Detecting the presence of chaos in a dynamical system is an important problem that is solved by measuring the LLE. Lyapunov exponents quantify the exponential divergence of initially close state-space trajectories and estimate the amount of chaos in a system. This method was applied to a set of signals from several nuclear power plant (NPP) reactors under commercial operating conditions that experienced instabilities events, apparently each of a different nature. Laguna Verde and Forsmark NPPs with in-phase instabilities, and Cofrentes NPP with out-of-phases instability. This study presents the results of intrinsic instability in the boiling water reactors of three NPPs. In the analyzed cases the limit cycle was not reached, which implies that the point of equilibrium exerts influence and attraction on system evolution

  8. Using largest Lyapunov exponent to confirm the intrinsic stability of boiling water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gavilian-Moreno, Carlos [Iberdrola Generacion, S.A., Cofrentes Nuclear Power Plant, Project Engineering Department, Paraje le Plano S/N, Valencia (Spain); Espinosa-Paredes, Gilberto [Area de ingeniera en Recursos Energeticos, Universidad Autonoma Metropolitana-Iztapalapa, Mexico city (Mexico)

    2016-04-15

    The aim of this paper is the study of instability state of boiling water reactors with a method based in largest Lyapunov exponents (LLEs). Detecting the presence of chaos in a dynamical system is an important problem that is solved by measuring the LLE. Lyapunov exponents quantify the exponential divergence of initially close state-space trajectories and estimate the amount of chaos in a system. This method was applied to a set of signals from several nuclear power plant (NPP) reactors under commercial operating conditions that experienced instabilities events, apparently each of a different nature. Laguna Verde and Forsmark NPPs with in-phase instabilities, and Cofrentes NPP with out-of-phases instability. This study presents the results of intrinsic instability in the boiling water reactors of three NPPs. In the analyzed cases the limit cycle was not reached, which implies that the point of equilibrium exerts influence and attraction on system evolution.

  9. Using Largest Lyapunov Exponent to Confirm the Intrinsic Stability of Boiling Water Reactors

    Directory of Open Access Journals (Sweden)

    Carlos J. Gavilán-Moreno

    2016-04-01

    Full Text Available The aim of this paper is the study of instability state of boiling water reactors with a method based in largest Lyapunov exponents (LLEs. Detecting the presence of chaos in a dynamical system is an important problem that is solved by measuring the LLE. Lyapunov exponents quantify the exponential divergence of initially close state-space trajectories and estimate the amount of chaos in a system. This method was applied to a set of signals from several nuclear power plant (NPP reactors under commercial operating conditions that experienced instabilities events, apparently each of a different nature. Laguna Verde and Forsmark NPPs with in-phase instabilities, and Cofrentes NPP with out-of-phases instability. This study presents the results of intrinsic instability in the boiling water reactors of three NPPs. In the analyzed cases the limit cycle was not reached, which implies that the point of equilibrium exerts influence and attraction on system evolution.

  10. Plan verde: un instrumento para la gestión y fomento de áreas verdes en el gran Santiago

    Directory of Open Access Journals (Sweden)

    Claudio Nilo Orellana

    2003-09-01

    Full Text Available La ciudad de Santiago, cuenta con una importante falencia de espacios verdes. La Organización Mundial de la Salud (OMS recomienda que las ciudades tengan 9 metros cuadrados por habitante. Por su parte, el Plan de Prevención y Descontaminación para la Región Metropolitana (PPDA se ha propuesto como meta lograr que el área Metropolitana logre un promedio de 6 metros cuadrados por habitante.

  11. Tritium in liquid phase in a BWR-5 like Laguna Verde

    International Nuclear Information System (INIS)

    Tijerina S, F.; Vargas A, A.; Cardenas J, J.

    2011-11-01

    In boiling water reactors (BWR), the tritium (H 3 ) takes place mainly as a result of ternary fissions in the nuclear reactors, of those which 75% are in gaseous form and 25% in liquid form. In the liquid phase, the tritium is transported to the pipes of the primary coolant toward condensed tanks or tanks of drainage excesses of radioactive equipment, located in external areas of a BWR, as well as to the processes of radioactive wastes to be able to be directed to the liquid effluents. For that reason, is necessary to know the possible routes of the transport and processes of the tritium in a BWR to control this radioisotope in the site of the event of leaks in equipment s and buried pipes, avoiding that emigrates toward underground flowing and an impact to the environment and to the people in general. (Author)

  12. 78 FR 32240 - Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar...

    Science.gov (United States)

    2013-05-29

    ... DEPARTMENT OF DEFENSE Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar Project at Edwards Air Force Base and County of Kern, CA AGENCY: Department of the... with the development of the Oro Verde Solar Project (OVSP) on Edwards AFB. The OVSP is a solar...

  13. Simulation of the electric systems of the Laguna Verde nuclear power station; Simulacion de los sistemas electricos de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Lozano, Saul; Ruiz Ponce, Gerardo E [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1992-03-01

    In this article, the electric system models of the Laguna Verde Nuclear Power Station (CNLV) simulator, are presented. These models permit the functioning simulation, in the different operation modes of the main generator (Ruiz and Rodriguez 1991a), of the auxiliaries system and of the substation (Ruiz and Rodriguez 1991b), and of the emergency diesel generators system (Ruiz and Rodriguez 1991c). The general characteristics of such systems, considered as the basis to obtain the representative models, which were developed as modules in an independent way to be integrated in the simulator, are also described. [Espanol] En este articulo, se presenta los modelos de los sistemas electricos del simulador de la Central Laguna Verde (CLV). Estos modelos permiten simular el funcionamiento, en los diferentes modos de operacion del generador principal (Ruiz y Rodriguez, 1991a), del sistema de auxiliares y de la subestacion (Ruiz y Rodriguez, 1991b) y del sistema de generadores diesel de emergencia (Ruiz y Rodriguez, 1991c). Asimismo, se describen las caracteristicas generales de tales sistemas, consideradas como la base para obtener los modelos representativos, los cuales fueron desarrollados como modulos en forma independiente para integrarse al simulador.

  14. Una nueva ultraestructura de ópalo CT en silcretas. Posible indicador de influencia bacteriana

    Directory of Open Access Journals (Sweden)

    Bustillo, Mª A.

    1995-04-01

    Full Text Available Electron microscope observations of opaline silcretes found in the playa of a Miocene shallow lake reveal new opal CT microstructures. These microstructures are made up of fibres, filaments or rods, which are formed, in tum by coalesced microspheres or microhemispheres (0,1-0,2 µ diameter. They are up to 10 µ in length although larger ones could exist. They are straight, bent, wavy or even hairpin shaped. These microstructures comprise part of the opaline mass of the silcretes and are very similar to both neogenic opaline structures which are formed by bacterial intluence and to silicified biofilms. Therefore microbial mediation could exist in the genesis of this opal CT, although a possible inorganic origin by silicification of sepiolite is also considered.Un estudio mediante MEB de silcretas miocenas opalinas formadas por silicificación de playas en un ambiente de «playa-lake» pone de manifiesto la existencia de una nueva microestructura de ópalo CT. Esta microestructura denominada en general fibrosa, se manifiesta por la presencia de multitud de fibras, filamentos o varillas formadas por la alineación de microesferas o microhemisferas que presentan un diámetro entre 0,1 y 0,2 µ. Las fibras, filamentos o varillas tienen formas variables: rectas, curvadas, onduladas y «en horquilla», y presentan longitudes de hasta 10 µ, aunque podrían existir longitudes mayores. La disposición organizada de las microesferas en filamentos o fibras, constituyendo la masa general del ópalo, y su parecido con microestructuras opalinas que han sido formadas por influencia bacteriana, hacen considerar esta hipótesis, aunque no se puede descartar totalmente un origen inorgánico por silicificación de sepiolita.

  15. Three-dimensional numerical investigation of a Molten Salt reactor concept with the code CFX-5.5

    International Nuclear Information System (INIS)

    Yamaji, B.; Csom, G.; Aszodi, A.

    2002-01-01

    Partitioning and transmutation of actinides and long-lived fission products is a promising option to extend the possibilities and enhance the environmentally acceptable capabilities of nuclear energy. Also the possible implementation of the thorium cycle is considered as a way to reduce the problem of energy resources in the future. For both objectives different molten salt reactor concepts were proposed mainly based on the Molten Salt Reactor Experiment of the Oak Ridge National Laboratory. Not only critical reactors but also accelerator-driven subcritical systems (ADSs) have advantages worth considering for those aims, especially those ones with liquid fuel, such as molten salts. By using liquid fuel which is the coolant medium, too, a basically different thermalhydraulic behavior is expected than in the case of solid fuel and water coolant. In this work our purpose is to present the possible use of Computational Fluid Dynamics (CFD) technology in molten salt thermal hydraulics. The simulations were performed with the three-dimensional code CFX-5.5.(author)

  16. Quantificação dos compostos bioactivos em infusões de chá verde dos Açores: comparação com os teores presentes em bebidas comerciais com chá verde : trabalho de investigação : quantification of bioactive compounds in Azorean Green Tea infusions: comparison with levels of canned green tea drinks

    OpenAIRE

    Petisca, Catarina Isabe Bento

    2008-01-01

    Resumo da tese: Neste estudo pretendeu-se avaliar a influência do tempo de infusão, da temperatura e das características da água no teor de catequinas, ácido gálico, teofilina e cafeína presentes em infusões de chá verde dos Açores. Adicionalmente, estes compostos foram quantificados em bebidas engarrafadas que mencionam chá verde na sua composição e comparados com os teores encontrados nas infusões de chá verde preparadas em casa. Nas amostras de chá verde dos Açores, foram encontradas difer...

  17. NPDES Permit for Mesa Verde National Park Water Treatment Plant in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034462, the United States Department of the Interior, National Park Service is authorized to discharge from the Mesa Verde National Park water treatment plant, in Montezuma County, Colo.

  18. Prevalence of anaemia and associated factors among children below five years of age in Cape Verde, West Africa.

    Science.gov (United States)

    Semedo, Rosa M L; Santos, Marta M A S; Baião, Mirian R; Luiz, Ronir R; da Veiga, Gloria V

    2014-12-01

    This study estimated the prevalence of anaemia and associated factors in a probability sample of 993 chil- dren aged 6-59 months in Cape Verde, West Africa. Odds ratio (OR) and 95% confidence interval (95% CI) were estimated from a hierarchical model for multiple analysis to assess the association between anaemia and explanatory variables. The prevalence of anaemia was 51.8% (95% CI 47.7-55.8). Children who resided within poor household conditions (OR 1.99; 95% CI 1.06-3.71) were below 24 months of age (OR 3.23; 95% CI 2.03-5.15) and recently experienced diarrhoea (OR 1.58; 95% CI 0.99-2.50) were at high risk of anaemia. Anaemia should be considered a serious public-health concern in Cape Verde, mainly for chil- dren below 24 months. Further, special consideration should be given to children who have experienced recent diarrhoea and belong to families residing in poor household conditions.

  19. Composición y riqueza de las comunidades de aves, muciélagos y escarabajos coprófagos asociados a agro-paisajes y áreas protegidas de un bosqeu tropical seco (Norte de Costa Rica)

    OpenAIRE

    Carvajal Sánchez, José Pablo

    2014-01-01

    [ES] La presente investigación tuvo como objetivo general analizar y comparar la composición y riqueza de las comunidades aves, murciélagos y escarabajos coprófagos presentes en seis tipos de cobertura vegetal: bosque ribereño, bosque secundario, charral, cercas vivas, pastizales (potreros), con alta y baja cobertura arbórea. La investigación se realiza en un área protegida del bosque seco tropical ¿Parque Nacional Palo Verde¿ y otra de agrocenósis, Cañas (N de Costa Rica). Los resultado...

  20. Integrated predictive maintenance program vibration and lube oil analysis: Part I - history and the vibration program

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, H.

    1996-12-01

    This paper is the first of two papers which describe the Predictive Maintenance Program for rotating machines at the Palo Verde Nuclear Generating Station. The organization has recently been restructured and significant benefits have been realized by the interaction, or {open_quotes}synergy{close_quotes} between the Vibration Program and the Lube Oil Analysis Program. This paper starts with the oldest part of the program - the Vibration Program and discusses the evolution of the program to its current state. The {open_quotes}Vibration{close_quotes} view of the combined program is then presented.

  1. Integrated predictive maintenance program vibration and lube oil analysis: Part I - history and the vibration program

    International Nuclear Information System (INIS)

    Maxwell, H.

    1996-01-01

    This paper is the first of two papers which describe the Predictive Maintenance Program for rotating machines at the Palo Verde Nuclear Generating Station. The organization has recently been restructured and significant benefits have been realized by the interaction, or open-quotes synergyclose quotes between the Vibration Program and the Lube Oil Analysis Program. This paper starts with the oldest part of the program - the Vibration Program and discusses the evolution of the program to its current state. The open-quotes Vibrationclose quotes view of the combined program is then presented

  2. The continental slope current system between Cape Verde and the Canary Islands

    Directory of Open Access Journals (Sweden)

    Jesús Peña-Izquierdo

    2012-08-01

    Full Text Available We use hydrographic, velocity and drifter data from a cruise carried out in November 2008 to describe the continental slope current system in the upper thermocline (down to 600 m between Cape Verde and the Canary Islands. The major feature in the region is the Cape Verde Frontal Zone (CVFZ, separating waters from tropical (southern and subtropical (northern origin. The CVFZ is found to intersect the slope north of Cape Blanc, between 22°N and 23°N, but we find that southern waters are predominant over the slope as far north as 24°N. South of Cape Blanc (21.25°N the Poleward Undercurrent (PUC is a prominent northward jet (50 km wide, reaching down to 300 m and indistinguishable from the surface Mauritanian Current. North of Cape Blanc the upwelling front is found far offshore, opening a near-slope northward path to the PUC. Nevertheless, the northward PUC transport decreases from 2.8 Sv at 18°N to 1.7 Sv at 24°N, with about 1 Sv recirculating ofshore just south of Cape Blanc, in agreement with the trajectory of subsurface drifters. South of the CVFZ there is an abrupt thermohaline transition at σϴ=26.85 kg m–3, which indicates the lower limit of the relatively pure (low salt and high oxygen content South Atlantic Central Water (SACW variety that coexists with the dominant locally-diluted (salinity increases through mixing with North Atlantic Central Water but oxygen diminishes because of enhanced remineralization Cape Verde (SACWcv variety. At 16°N about 70% of the PUC transport corresponds to the SACW variety but but this is transformed into 40% SACWcv at 24°N. However, between Cape Verde and Cape Blanc and in the 26.85 < σϴ < 27.1 layer, we measure up to 0.8 Sv of SACWcv being transported south. The results strongly endorse the idea that the slope current system plays a major role in tropical-subtropical water-mass exchange.

  3. AVALIAÇÃO DE CONTAMINAÇÃO POR ECHERICHIA COLI DA LINHA VERDE DA LAGOA DO MEIO, LINHARES-ES

    Directory of Open Access Journals (Sweden)

    Rafael Zucateli da Vitoria

    2016-10-01

    Full Text Available Atualmente os rios, lagos e lagoas, situados próximos às cidades estão recebendo altas cargas poluidoras. Devido estes fatores os eventos climáticos como chuvas e secas estão cada vez mais severos e as fontes hídricas saldáveis cada vez mais escassas, portanto, é muito importante manter os recursos hídricos limpos para em caso de necessidade hídrica poder contar com mais alternativas e fontes para capitação de água para consumo. Avaliou-se  a localidade denominada Linha Verde da Lagoa do Meio no município de Linhares em relação à contaminação por Escherichia coli, sendo coletadas duas amostras de água da lagoa. Amostra 1 a montante da Linha Verde e Amostra 2 a jusante da Linha Verde e com base nos resultados obtidos a Lagoa do Meio está livre de contaminação por Escherichia coli na localidade da Linha Verde.

  4. Composition of fluid inclusions in Permian salt beds, Palo Duro Basin, Texas, U.S.A.

    Science.gov (United States)

    Roedder, E.; d'Angelo, W. M.; Dorrzapf, A.F.; Aruscavage, P. J.

    1987-01-01

    Several methods have been developed and used to extract and chemically analyze the two major types of fluid inclusions in bedded salt from the Palo Duro Basin, Texas. Data on the ratio K: Ca: Mg were obtained on a few of the clouds of tiny inclusions in "chevron" salt, representing the brines from which the salt originally crystallized. Much more complete quantitative data (Na, K, Ca, Mg, Sr, Cl, SO4 and Br) were obtained on ??? 120 individual "large" (mostly ???500 ??m on an edge, i.e., ??? ??? 1.6 ?? 10-4 g) inclusions in recrystallized salt. These latter fluids have a wide range of compositions, even in a given piece of core, indicating that fluids of grossly different composition were present in these salt beds during the several (?) stages of recrystallization. The analytical results indicating very large inter-and intra-sample chemical variation verify the conclusion reached earlier, from petrography and microthermometry, that the inclusion fluids in salt and their solutes are generally polygenetic. The diversity in composition stems from the combination of a variety of sources for the fluids (Permian sea, meteoric, and groundwater, as well as later migrating ground-, formation, or meteoric waters of unknown age), and a variety of subsequent geochemical processes of dissolution, precipitation and rock-water interaction. The compositional data are frequently ambiguous but do provide constraints and may eventually yield a coherent history of the events that produced these beds. Such an understanding of the past history of the evaporite sequence of the Palo Duro Basin should help in predicting the future role of the fluids in the salt if a nuclear waste repository is sited there. ?? 1987.

  5. Patterns of genetic diversity in three plant lineages endemic to the Cape Verde Islands.

    Science.gov (United States)

    Romeiras, Maria M; Monteiro, Filipa; Duarte, M Cristina; Schaefer, Hanno; Carine, Mark

    2015-05-15

    Conservation of plant diversity on islands relies on a good knowledge of the taxonomy, distribution and genetic diversity of species. In recent decades, a combination of morphology- and DNA-based approaches has become the standard for investigating island plant lineages and this has led, in some cases, to the discovery of previously overlooked diversity, including 'cryptic species'. The flora of the Cape Verde archipelago in the North Atlantic is currently thought to comprise ∼740 vascular plant species, 92 of them endemics. Despite the fact that it is considered relatively well known, there has been a 12 % increase in the number of endemics in the last two decades. Relatively few of the Cape Verde plant lineages have been included in genetic studies so far and little is known about the patterns of diversification in the archipelago. Here we present an updated list for the endemic Cape Verde flora and analyse diversity patterns for three endemic plant lineages (Cynanchum, Globularia and Umbilicus) based on one nuclear (ITS) and four plastid DNA regions. In all three lineages, we find genetic variation. In Cynanchum, we find two distinct haplotypes with no clear geographical pattern, possibly reflecting different ploidy levels. In Globularia and Umbilicus, differentiation is evident between populations from northern and southern islands. Isolation and drift resulting from the small and fragmented distributions, coupled with the significant distances separating the northern and southern islands, could explain this pattern. Overall, our study suggests that the diversity in the endemic vascular flora of Cape Verde is higher than previously thought and further work is necessary to characterize the flora. Published by Oxford University Press on behalf of the Annals of Botany Company.

  6. Assessment of a RELAP5 model for the IPR-R1 TRIGA research reactor

    International Nuclear Information System (INIS)

    Reis, Patricia A.L.; Costa, Antonella L.; Pereira, Claubia; Veloso, Maria A.F.; Mesquita, Amir Z.; Soares, Humberto V.

    2010-01-01

    RELAP5 code was developed at the Idaho National Environmental and Engineering Laboratory and it is widely used for thermal hydraulic studies of commercial nuclear power plants and, currently, it has been also applied for thermal hydraulic analysis of nuclear research systems with good predictions. This work is a contribution to the assessment of RELAP5/3.3 code for research reactors analysis. It presents steady-state and transient calculation results performed using a RELAP5 model to simulate the IPR-R1 TRIGA research reactor conditions operating at 50 and 100 kW. The reactor is located at the Nuclear Technology Development Centre (CDTN), Brazil. The development and the assessment of a RELAP5 model for the IPR-R1 TRIGA are presented. Experimental data were considered in the process of code-to-data validation. The RELAP5 results were also compared with calculation performed using the STHIRP-1 (Research Reactors Thermal Hydraulic Simulation) code. The use of a cross flow model has been essential to improve results in the transient condition respect to preceding investigations.

  7. Palinofloras de las formaciones El Morterito y Palo Pintado [Mioceno Superior-Plioceno Inferior], noroeste de Argentina

    OpenAIRE

    Horn, Maricel Yanina

    2014-01-01

    En esta Tesis Doctoral se presenta el estudio palinológico de dos unidades litológicas del Mioceno Tardío/Plioceno de Argentina: la Formación El Morterito (Aloformación Playa del Zorro) aflorante en el valle del Cajón, provincia de Catamarca y Formación Palo Pintado en el Valle Calchaquí, provincia de Salta. La sucesión Neógena del valle del Cajón fue primeramente descripta como Formación El Morterito, posteriormente se reconocieron tres Aloformaciones. Considerando las áreas de distribución ...

  8. New species of Rissoidae from the Cape Verde Islands (Mollusca: Gastropoda) Part 1

    OpenAIRE

    Moolenbeek, R.G.; Rolán, E.

    1988-01-01

    Sediment samples collected at the Cape Verde Islands contained many interesting micromolluscs. Amongst them, four new species of the family Rissoidae ( Alvania peli, A. nicolauensis, A. stocki and A. planciusi).

  9. Scale-4 analysis of pressurized water reactor critical configurations: Volume 5, North Anna Unit 1 Cycle 5

    International Nuclear Information System (INIS)

    Bowman, S.M.; Suto, T.

    1996-10-01

    ANSI/ANS 8.1 requires that calculational methods for away-from- reactor (AFR) criticality safety analyses be validated against experiment. This report summarizes part of the ongoing effort to benchmark AFR criticality analysis methods using selected critical configurations from commercial PWRs. Codes and data in the SCALE-4 code system were used. This volume documents the SCALE system analysis of one reactor critical configuration for North Anna Unit 1 Cycle 5. The KENO V.a criticality calculations for the North Anna 1 Cycle 5 beginning-of-cycle model yielded a value for k eff of 1. 0040±0.0005

  10. Constitutive parameters for salt and nonsalt rocks from the Detten, G. Friemel, and Zeeck wells in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Senseny, P.E.; Pfeifle, T.W.; Mellegard, K.D.

    1985-01-01

    Results are presented from laboratory tests performed on salt and nonsalt rocks from the Palo Duro Basin in Texas. The Unit 5 salt from the Lower San Andres is assumed to be the repository horizon and is more completely characterized than other strata. For the Unit 5 salt, values are given for the parameters in the exponential-time constitutive law that models the time-independent elastic deformation and the time-dependent inelastic deformation. Both linear and nonlinear failure envelopes for this salt at 20 0 C are also determined. Data reported for twenty other salt and nonsalt horizons include tangent moduli and principal strain ratios, as well as linear failure envelopes at 20 0 C. The matrix of tests performed is adequate for conceptual repository design and performance analysis. However, final repository design and performance analysis requires more extensive characterization of the constitutive behavior of the stratigraphy, especially the repository-horizon salt

  11. Synthesis of Upper Verde River research and monitoring 1993-2008

    Science.gov (United States)

    Daniel G. Neary; Alvin L. Medina; John N. Rinne

    2012-01-01

    This volume is a state-of-knowledge synthesis of monitoring and research conducted on the Upper Verde River (UVR) of Arizona. It contains information on the history, hydrology, soils, geomorphology, vegetation, and fish fauna of the area that can help land managers and other scientists in successfully conducting ecosystem management and future monitoring and research...

  12. Oral receptivity of Aedes aegypti from Cape Verde for yellow fever, dengue, and chikungunya viruses.

    Science.gov (United States)

    Vazeille, Marie; Yébakima, André; Lourenço-de-Oliveira, Ricardo; Andriamahefazafy, Barrysson; Correira, Artur; Rodrigues, Julio Monteiro; Veiga, Antonio; Moreira, Antonio; Leparc-Goffart, Isabelle; Grandadam, Marc; Failloux, Anna-Bella

    2013-01-01

    At the end of 2009, 21,313 cases of dengue-3 virus (DENV-3) were reported in the islands of Cape Verde, an archipelago located in the Atlantic Ocean 570 km from the coast of western Africa. It was the first dengue outbreak ever reported in Cape Verde. Mosquitoes collected in July 2010 in the city of Praia, on the island of Santiago, were identified morphologically as Aedes aegypti formosus. Using experimental oral infections, we found that this vector showed a moderate ability to transmit the epidemic dengue-3 virus, but was highly susceptible to chikungunya and yellow fever viruses.

  13. Project and characteristics of a 5MW experimental fast reactor

    International Nuclear Information System (INIS)

    Ishiguro, Y.; Nascimento, J.A. do.

    1986-05-01

    Characteristics of a 5 MW experimental fast reactor are reported. The reactor is designed with emphasis on fuel and materials irradiation and uses fuel assemblies of a standard structure. The reference core consist of 37 fuel assemblies, each of which contains 19 pins of metallic Pu/Zr fuel. With a core height of 17.6 cm the core volume is 11.4 liter and the central fast (E >=100 KeV) flux is 0.9 x 10 15 n/cm 2 sec. In addition to twelve control rod assemblies with a total reactivity worth of 5.5% Δk, 42 assemblies for reactivity compensation are placed in the two rings outside the core. Replacing these assemblies with driver, blanket, or refletor-shield assemblies, large reactivities can be added to make the central assembly position available for test irradiations and to assure high levels of burnup of driver assemblies. (Author) [pt

  14. Estudo comparativo do uso tópico de própolis verde e vermelha na reparação de feridas em ratos

    Directory of Open Access Journals (Sweden)

    Lara Lívia Valença Batista

    Full Text Available OBJETIVO: Avaliar a ação cicatrizante de própolis verde e vermelha, correlacionando ao teor de flavonoides MÉTODOS: Foi realizada a quantificação de flavonoides totais dos extratos etanólicos de própolis verde e vermelha para posterior incorporação em pomada base a 20%. Utilizou-se 20 ratos Wistar distribuídos em quatro grupos: solução salina a 0,9% (S, pomada base (B, pomada própolis verde (G, pomada própolis vermelha (R, todos submetidos à confecção de lesões excisivas na região mediana do dorso. Os ratos foram tratados diariamente durante 15 dias. Neste período foram observados peso; temperatura corporal; diâmetro das feridas. Para análise histológica, amostras das feridas foram coletadas. Ao fim do experimento foram realizadas coleta sanguínea e remoção do rim e fígado para análises bioquímica e histológica. RESULTADOS: Os teores de flavonoides totais das própolis verde (4,50 % e vermelha (5,92 % foram elevados (>2 %, mas, embora a segunda apresente teor maior que a primeira, a evolução da própolis verde, macro e histologicamente, foi melhor na reparação das feridas. Não foram observadas nefro ou hepatotoxicidade, resultado corroborado pelos ensaios bioquímicos (TGP e albumina. A própolis influiu na redução de colesterol total, triglicerídeos e glicemia. CONCLUSÃO: Não foi possível correlacionar o teor de flavonoides totais com a ação cicatrizante da própolis. O dado revela a necessidade da elucidação dos flavonoides encontrados em cada classe de própolis para desvendar qual (ou quais flavonoide(s seria(m representativo(s no processo cicatricial.

  15. Influência de áreas verdes urbanas sobre a mirmecofauna

    Directory of Open Access Journals (Sweden)

    Milene Andrade Estrada

    Full Text Available O trabalho objetivou estudar a influência de características da arborização das áreas verdes urbanas sobre a mirmecofauna. A pesquisa foi conduzida no Município de Três Rios-RJ, em um parque urbano e em cinco praças públicas arborizadas. Foram obtidas a densidade de árvores, a densidade de espécies de árvores e a temperatura do ar. As formigas foram coletadas no solo e sobre o tronco de árvores, com iscas de sardinha. Foram coletadas 44 espécies de formigas, 26 espécies no solo e 37 espécies nas árvores. A densidade de espécies de árvores influenciou positivamente o número total de espécies de formigas e a diversidade de espécies coletadas nas árvores. Conclui-se que o aumento da densidade de espécies de árvores nas áreas verdes urbanas pode colaborar para a conservação da diversidade biológica.

  16. Seasonal variability of aerosol concentration and size distribution in Cape Verde using a continuous aerosol optical spectrometer

    Directory of Open Access Journals (Sweden)

    Casimiro Adrião Pio

    2014-05-01

    Full Text Available One year of, almost continuous, measurements of aerosol optical properties and chemical composition were performed at the outskirts of Praia, Santiago Island, Cape Verde, within the framework of CV-DUST (Atmospheric aerosol in Cape Verde region: seasonal evaluation of composition, sources and transport research project, during 2011. This article reports the aerosol number and mass concentration measurements using a GRIMM Optical Aerosol Spectrometer that provides number size discrimination into 31 size ranges from 0.25 to 32 µm. Time series of 5 min average PM10 concentrations revealed peak values higher than 1000 µg.m-3 during winter dust storm events originating over Northern Africa. The 24 hours average concentrations exceeded the World Health Organization (WHO guidelines for PM2.5 and PM10 in 20% and 30% of the 2001 days, respectively. Annual average mass concentrations (±standard deviation for PM1, PM2.5 and PM10 were 5±5, 19±21 and 48±64 µg.m-3, respectively. The annual PM2.5 and PM10 values were also above the limits prescribed by the WHO (10 and 20 µg.m-3, respectively. The aerosol mass size distribution revealed two main modes for particles smaller than 10 µm: a fine mode (0.7-0.8 µm, which possibly results of gas to particle conversion processes; and a coarse mode with maxima at 3-4 µm, which is associated with desert dust and sea salt sources. Within the coarse mode two sub-modes with maxima at 5-6 µm and 10-12 µm were frequently present.

  17. Verde plant bug, Creontiades signatus (Hemiptera: Miridae) effects of insect density and bloom period of infestation on cotton damage and yield

    Science.gov (United States)

    The verde plant bug, Creontiades signatus Distant (Hemiptera: Miridae), has emerged as a threat to cotton in South Texas, causing boll damage similar to boll-feeding stink bugs (Hemiptera: Pentatomidae). Verde plant bugs were released into caged cotton for a one-week period to characterize the effec...

  18. El anillo verde de Vitoria-Gasteiz

    Directory of Open Access Journals (Sweden)

    Marañón, Blanca

    2001-10-01

    de la periferia de la ciudad, donde coexistían zonas de alto valor ecológico sometidas a agresiones de todo tipo, con otros espacios degradados y marginales, fruto de la expansión urbana e industrial. La restauración ecológico-paisajística de estos espacios y su acondicionamiento para el uso público han permitido configurar un "anillo verde multifunción" en torno a la ciudad que está proporcionando importantes beneficios ambientales, sociales y económicos. El anillo verde ha jugado un papel importante en la integración naturaleza-ciudad, equilibrando la oferta de zonas verdes entre todos los barrios y favoreciendo la conexión entre los espacios verdes urbanos y los espacios naturales del entorno agrícola. Ha propiciado, asimismo, el desarrollo de nuevas actividades relacionadas con el ocio y el esparcimiento y con la formación, educación y sensibilización ambiental; actividades que, por un lado, están suponiendo un revulsivo para el sector empresarial ambiental y la integración socio-laboral de determinados colectivos sociales y, por otro, contribuyen a la conservación de estos espacios, al convertirse los usuarios en sus mayores defensores y guardianes. La utilización de algunos de estos espacios como superficies de laminación de agua en épocas de avenidas para solventar problemas de inundación en las zonas industriales es otro ejemplo del valor añadido obtenido al plantear soluciones integrales. Los excelentes resultados obtenidos tras nueve años de trabajo demuestran la viabilidad técnica y económica y la rentabilidad social de este proyecto, que representa una prueba evidente de la decidida voluntad municipal de avanzar hacia un modelo de ciudad sostenible en armonía con el medio natural que la rodea.

  19. Do riparian plant community characteristics differ between Tamarix (L.) invaded and non-invaded sites on the upper Verde River, Arizona?

    Science.gov (United States)

    Tyler D. Johnson; Thomas E. Kolb; Alvin L. Medina

    2009-01-01

    Invasion by Tamarix (L.) can severely alter riparian areas of the western U.S., which are globally rare ecosystems. The upper Verde River, Arizona, is a relatively free-flowing river and has abundant native riparian vegetation. Tamarix is present on the upper Verde but is a minor component of the vegetation (8% of stems). This...

  20. Impact on the bar value in hot by the introduction of advanced control bars in the Unit 1 of the Laguna Verde Nuclear power plant

    International Nuclear Information System (INIS)

    Montes, J.L.; Perusquia, R.; Ortiz, J.J.; Hernandez, J.L.; Ramirez, J.R.

    2004-01-01

    In recent dates the Laguna Verde Nuclear Power station (CNLV) has acquired new designs of control bars, this new type of bars presents modifications important in their design. For what is important to analyze their performance inside those reactors of this nuclear power station. Presently work is shown the behavior of the nucleus of the reactor in hot condition (HFP) when three different types of control bar are used. The first of them corresponds the one that initially has been used in this power station and that we will call original. The second type of control bars, it corresponds to an advanced type and it is the first design different from the original and it corresponds to a bar design that it includes Hafnium (Hf) like one of their neutronic absorption characteristics. The third, denoted as 2AV, include besides the material of the second type new design characteristics, and it is the last finish bar type that it has been introduced in the operation of the reactors of the CNLV. With base in the studied cases is found that the bars 2AV have a total power value, 7.6 % bigger respect the bars 1AV; and in turn the bars 1AV, 6.1 % bigger with respect the ORG control bars. (Author)

  1. A volcanological and geochemical investigation of Boa Vistta, Cape Verde Islands

    DEFF Research Database (Denmark)

    Dyhr, Charlotte Thorup; Holm, Paul Martin

    2009-01-01

    Boa Vista, the easternmost island in the Cape Verde archipelago, consists of volcanic products, minor intrusions and a thin partial sedimentary cover. The first 15 age results from 40Ar/39Ar incremental heating analysis of groundmass separates from volcanic and plutonic rocks from Boa Vista are p...

  2. MCTP, a code for the thermo-mechanical analysis of a fuel rod of BWR type reactors (Neutron part)

    International Nuclear Information System (INIS)

    Hernandez L, H.; Ortiz V, J.

    2003-01-01

    In the National Institute of Nuclear Research of Mexico a code for the thermo-mechanical analysis of the fuel rods of the BWR type reactors of the Nucleo electric Central of Laguna Verde is developed. The code solves the diffusion equation in cylindrical coordinates with several energy groups. The code, likewise, calculates the temperature distribution and power distribution in those fuel rods. The code is denominated Multi groups With Temperatures and Power (MCTP). In the code, the energy with which the fission neutrons are emitted it is divided in six groups. They are also considered the produced perturbations by the changes in the temperatures of the materials that constitute the fuel rods, the content of fission products, the uranium consumption and in its case the gadolinium, as well as the plutonium production. In this work there are present preliminary results obtained with the code, using data of operation of the Nucleo electric Central of Laguna Verde. (Author)

  3. Effluents and releases of tritium from Novo-Voronezh-5 reactor

    International Nuclear Information System (INIS)

    Babenko, A.G.; Mekhedov, B.N.; Podporinova, L.E.; Popov, S.V.; Shalin, A.N.

    1990-01-01

    Results of systematic measurements of tritium concentration within technological systems of reactor of Novo-Voronezh NPP conducted to evaluate tritium effluents and releases and radiation doses to population from these effluents and releases are given. It is shown that 68% concerning tritium total amount were disposed into sewerage while 17% - through vent tube and 15% - with water and steam from secondary circuit systems. Standartized tritium effluents from WWER-1000 reactor for 5 year run constitute 15±1.9 GBq/MWxyear and it corresponds to mean value of effluents for foreign NPPs. Tritium concentration in the atmosphere constituted according to calculations (4.1-20)x10 -5 Bq/l. Conclusion is made about insignificant dose to population from tritium gaseous effluents. Detail study is necessary for dose connected with tritium contained in water effluents

  4. PROCESSAMENTO DE CASCA E FIBRA DE COCO VERDE POR CARBONIZAÇÃO PARA AGREGAÇÃO DE VALOR / PROCESSING OF COCONUT SHELL AND FIBER FOR ADDING VALUE

    OpenAIRE

    LUIS A. B. CORTEZ; JUAN M. M. PEREZ; JOSÉ D. ROCHA; RODRIGO A. JORDAN; HENRY R. M. MESA

    2009-01-01

    Atualmente o Brasil é o maior produtor de coco verde, com uma área plantada equivalente a 57 mil hectares, onde a maior parte da parte da produção (66,5%) se concentra na região Nordeste. O descarte do coco depois do consumo da água representa um problema para os sistemas de coleta e tratamento de lixo, pela sua lenta degradação devido ao alto teor de fibras. Neste trabalho são mostrados os resultados da pirólise lenta da fibra e da casca do coco verde. Os experimentos foram conduzidos em um ...

  5. Multivariate analysis in the frequency mastery applied to the Laguna Verde Central

    International Nuclear Information System (INIS)

    Castillo D, R.; Ortiz V, J.; Calleros M, G.

    2006-01-01

    The noise analysis is an auxiliary tool in the detection of abnormal operation conditions of equipment, instruments or systems that affect to the dynamic behavior of the reactor. The spectral density of normalized power has usually been used (NPSD, by its initials in English), to watch over the behavior of some components of the reactor, for example, the jet pumps, the recirculation pumps, valves of flow control in the recirculation knots, etc. The behavior change is determined by individual analysis of the NPSD of the signals of the components in study. An alternative analysis that can allow to obtain major information on the component under surveillance is the multivariate autoregressive analysis (MAR, by its initials in English), which allows to know the relationship that exists among diverse signals of the reactor systems, in the time domain. In the space of the frequency, the relative contribution of power (RPC for their initials in English) it quantifies the influence of the variables of the systems on a variable of interest. The RPC allows, therefore that for a peak shown in the NPSD of a variable, it can be determine the influence from other variables to that frequency of interest. This facilitates, in principle, the pursuit of the important physical parameters during an event, and to study their interrelation. In this work, by way of example of the application of the RPC, two events happened in the Laguna Verde Central are analyzed: the rods blockade alarms by high scale in the monitors of average power, in which it was presents a power peak of 12% of width peak to peak, and the power oscillations event. The main obtained result of the analysis of the control rods blockade alarm event was that it was detected that the power peak observed in the signals of the average power monitors was caused by the movement of the valve of flow control of recirculation of the knot B. In the other oscillation event the results its show the mechanism of the oscillation of

  6. Testing and sampling of deep brine aquifers in the Palo Duro Basin, West Texas

    International Nuclear Information System (INIS)

    Deyling, M.A.

    1984-01-01

    The US Department of Energy is investigating the Palo Duro Basin of West Texas along with locations in Nevada, Washington, Utah, Mississippi and Louisiana as potential sites for storage of high-level nuclear waste. Ten wells have been drilled to depths between 3000 and 8300 feet. Testing and sampling of deep test zones requires advance planning and analysis of what must be obtained from the well. Various alternatives are available depending on data needs. In this particular instance, both hydrologic and geochemical data were required. The methods chosen were field proven methods used in the oil field industry for many years. Short term testing has included conventional oil-field-type drill stem tests and drill stem equipment with surface pressure readout. Long term testing has consisted of a series of production and recovery tests. Fluid sampling was performed in two stages. The first was at the well head under an imposed pressure of several hundred psi. The second fluid samples were collected downhole at the production zone under pressures close to ambient pressure. The geochemical data and hydrologic data can be used as independent checks on each other in many cases. Test results from the well along with examination of recovered core provided maximum data for each well. 5 references, 8 figures

  7. Fibra da casca do coco verde como substrato agrícola

    Directory of Open Access Journals (Sweden)

    Carrijo Osmar Alves

    2002-01-01

    Full Text Available A produção comercial de mudas e o cultivo sem solo de hortaliças estão se tornando práticas comuns entre os olericultores. Vários materiais orgânicos como as turfas, resíduos de madeira, casca de pinus e de arroz parcialmente carbonizada ou não, ou materiais inorgânicos como areia, rochas vulcânicas, perlita, lã de rocha e a espuma fenólica já são utilizados como substratos, isoladamente ou em composição. A casca de coco verde que em muitas regiões causa transtorno ao serviço de limpeza pública pelo volume e pela dificuldade de decomposição produz uma fibra que pode ser utilizada como substrato. Para a produção da fibra, a casca de coco verde é picada, desfibrada, triturada, lavada e secada. Para o uso como substrato na produção de mudas, a fibra deve passar por um processo de compostagem. Este processo não é necessário para o uso como substrato em cultivo sem solo, mas no entanto, o substrato necessitará ser enriquecido com nutrientes em pré-plantio ou em fertirrigação. O uso do substrato da fibra de coco verde na produção de tomate em casa de vegetação, alcançou, em termos absolutos, 13,2 kg m-2 de frutos comerciais (média de 3 anos cerca de 7,3% mais que o segundo melhor substrato, o pó de serra com 12,3 kg m-2.

  8. El caballero del Verde Gabán: algunas consideraciones desde el epicureísmo y el estoicismo

    Directory of Open Access Journals (Sweden)

    Josefa Álvarez

    2007-12-01

    Full Text Available The purpose of this paper is to study the figure of the “Caballero del Verde Gabán” from the perspectives of the stoic and Epicurean philosophic traditions given that these traditions deeply influenced the literatures and thought of the Golden Age. To do so, we search and analyze several greco-roman sources that lead us to determine that although both philosophic traditions converge in the figure of the “Caballero del Verde Gabán” a clear preeminence of the epicurean tradition is evident. In contrast, a clear stoic tradition is clear in the figure of “Don Quijote”. We attempt to show how Cervantes presents the reader with two ways of life at odds with each other at the beginning of a new century; one full of realism and pragmatism in the figure of the “Caballero del Verde Gabán”, the other, “the quijotesco” showing its anachronistic idealism.

  9. Generation of the ECP database (ECP01.DAT) of the cycle 1 of the Unit 1 of Laguna Verde with burnt of 1377 MWD/MT; Generacion de la base ECP (ECP01.DAT) del ciclo 1 de la Unidad 1 de Laguna Verde con quemado de 1377 MWD/MT

    Energy Technology Data Exchange (ETDEWEB)

    Perusquia C, R. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1992-10-15

    In order to carrying out a comparison among the results provided by the Program of Estimate of the ECP Critical Position and the Shutdown/Startup produced in the Cycle 1 of the Unit 1 of Laguna Verde, it was generated the base of the ECP program, following the outlines settled down in the Procedure 'Generation of ECP Database for Laguna Verde' (IT.SN/DFR-074). Next the data sheets filled when being generated the ECP01.DAT database with a burnt of 1377 MWD/MT are provided. In the report IT.SN/DFR-079 'Adjustment and Preliminary Evaluation of the Predictions of Criticity of the ECP Program with Reported Data of the Cycle 1 of the Unit 1 of Laguna Verde', the results of the comparison among those estimates of the ECP program using the ECP01.DAT database with the real data of the Cycle 1 of the Unit 1 of Laguna Verde are presented. (Author)

  10. An Order Coding Genetic Algorithm to Optimize Fuel Reloads in a Nuclear Boiling Water Reactor

    International Nuclear Information System (INIS)

    Ortiz, Juan Jose; Requena, Ignacio

    2004-01-01

    A genetic algorithm is used to optimize the nuclear fuel reload for a boiling water reactor, and an order coding is proposed for the chromosomes and appropriate crossover and mutation operators. The fitness function was designed so that the genetic algorithm creates fuel reloads that, on one hand, satisfy the constrictions for the radial power peaking factor, the minimum critical power ratio, and the maximum linear heat generation rate while optimizing the effective multiplication factor at the beginning and end of the cycle. To find the values of these variables, a neural network trained with the behavior of a reactor simulator was used to predict them. The computation time is therefore greatly decreased in the search process. We validated this method with data from five cycles of the Laguna Verde Nuclear Power Plant in Mexico

  11. Hydrogen production using Rhodopseudomonas palustris WP 3-5 with hydrogen fermentation reactor effluent

    International Nuclear Information System (INIS)

    Chi-Mei Lee; Kuo-Tsang Hung

    2006-01-01

    The possibility of utilizing the dark hydrogen fermentation stage effluents for photo hydrogen production using purple non-sulfur bacteria should be elucidated. In the previous experiments, Rhodopseudomonas palustris WP3-5 was proven to efficiently produce hydrogen from the effluent of hydrogen fermentation reactors. The highest hydrogen production rate was obtained at a HRT value of 48 h when feeding a 5 fold effluent dilution from anaerobic hydrogen fermentation. Besides, hydrogen production occurred only when the NH 4 + concentration was below 17 mg-NH 4 + /l. Therefore, for successful fermentation effluent utilization, the most important things were to decrease the optimal HRT, increase the optimal substrate concentration and increase the tolerable ammonia concentration. In this study, a lab-scale serial photo-bioreactor was constructed. The reactor overall hydrogen production efficiency with synthetic wastewater exhibiting an organic acid profile identical to that of anaerobic hydrogen fermentation reactor effluent and with effluent from two anaerobic hydrogen fermentation reactors was evaluated. (authors)

  12. Relap5 simulation for severe accident analysis of RSG-GAS Reactor

    International Nuclear Information System (INIS)

    Andi Sofrany Ekariansyah; Endiah P-Hastuti; Sudarmono

    2018-01-01

    The research reactor in the world is to be known safer than power reactor due to its simpler design related to the core and operational characteristics. Nevertheless, potential hazards of research reactor to the public and the environment can not be ignored due to several special features. Therefore the level of safety must be clearly demonstrated in the safety analysis report (SAR) using safety analysis, which is performed with various approaches and methods supported by computational tools. The purpose of this research is to simulate several accidents in the Indonesia RSG-GAS reactor, which may lead to the fuel damage, to complement the severe accident analysis results that already described in the SAR. The simulation were performed using the thermal hydraulic code of RELAP5/SCDAP/Mod3.4 which has the capability to model the plate-type of RSG-GAS fuel elements. Three events were simulated, which are loss of primary and secondary flow without reactor trip, blockage of core subchannels without reactor trip during full power, and loss of primary and secondary flow followed by reactor trip and blockage of core subchannel. The first event will harm the fuel plate cladding as showed by its melting temperature of 590 °C. The blockage of one or more subchannels in the one fuel element results in different consequences to the fuel plates, in which at least two blocked subchannels will damage one fuel plate, even more the blockage of one fuel element. The combination of loss of primary and secondary flow followed by reactor trip and blockage of one fuel element has provided an increase of fuel plate temperature below its melting point meaning that the established natural circulation and the relative low reactor power is sufficient to cool the fuel element. (author)

  13. Generation of the ECP database (ECP02.DAT) at the beginning of the cycle 1 of the Unit 1 of Laguna Verde

    International Nuclear Information System (INIS)

    Perusquia C, R.

    1992-10-01

    In order to carrying out a comparison among the results provided for the Program of Estimate of the ECP Critical Position and the Shutdown/Startup produced in the Cycle 1 of the Unit 1 of Laguna Verde, it was generated the base of the ECP program, following the outlines settled down in the Procedure 'Generation of ECP Database for Laguna Verde' (IT.SN/DFR 074). Next the data sheets filled when being generated the ECP02.DAT database at the beginning of the cycle are provided. In the IT.SN/DFR 079 report 'Adjustment and Preliminary Evaluation of the Predictions of Criticity of the ECP Program with Reported Data of Cycle 1 of the Unit 1 of Laguna Verde, the results of the comparison among the estimates of the ECP program using the ECP02.DAT with the real data of the Cycle 1 of the Unit 1 of Laguna Verde are presented. (Author)

  14. Estudio de viabilidad de una instalación fotovoltaica para una vivienda unifamiliar situada en Cabo de Palos

    OpenAIRE

    Sánchez Ros, Adrián Antonio

    2015-01-01

    El presente proyecto tiene por objetivo el análisis técnico y económico de una instalación fotovoltaica en una vivienda unifamiliar ubicada en Cabo de Palos (Cartagena), planteando distintas alternativas de conexión o no a la red: - Instalación fotovoltaica conectada a red, dedicadas a la inyección a la red y venta de la energía eléctrica. - Instalación fotovoltaica aislada, dedicadas al autoconsumo de la electricidad generada. - Instalación fotovoltaica de autoconsumo in...

  15. Distribución, superficie y accesibilidad de las áreas verdes en Santiago de Chile

    Directory of Open Access Journals (Sweden)

    Sonia Reyes Päcke

    2010-12-01

    Full Text Available Las áreas verdes urbanas (AVU proveen servicios sociales y ecológicos, en función de su distribución, superficie y accesibilidad. Se evalúan dichos atributos para las AVU de Santiago mediante métricas de paisaje. Se muestra que el 91% de las AVU tiene tamaño menor a 5.000 m². Las comunas de bajos ingresos y mayor población presentan un mayor número de áreas verdes (NP, pero de menor tamaño (Green spaces provide social and ecological functions within urban environments. The magnitude of these depends on the size, distribution and accessibility of such spaces. These attributes of the green areas in Santiago de Chile are evaluated using landscape metrics. The results show that 91% of green spaces are smaller than 5,000 m2. Municipalities with higher population and lower income levels had a greater number of green spaces, but these are smaller than 1,000 m2. The four municipalities with the highest income levels have 32.2% of the total green space surface, while the four municipalities with the lowest income levels barely exceed 4.0%>. The proposed accessibility indicator (IAc reveals that in the La Pintana municipality (low income level, 19.6% of the population has access to a green space of at least 5,000 within 300 from their home, while this figure is 45.3% for San Miguel (medium income level and 74.1% in Vitacura (high income level. Chilean urban legislation tends to promote the creation of smaller green spaces.

  16. Promoting Distance Education in Higher Education in Cape Verde and Mozambique

    Science.gov (United States)

    Ramos, Fernando; Taju, Gulamo; Canuto, Louisette

    2011-01-01

    Over the past six years, the authors have been project leaders for three distance education initiatives in Cape Verde and Mozambique: (1) a blended learning master's degree in multimedia in education for faculty in Cape Verdean public higher education institutions (2005-2008); (2) a teacher training programme for 1375 elementary teachers provided…

  17. Seasonal patterns in metazoan parasite community of the "Fat Sleeper" Dormitator latifrons (Pisces: Eleotridae from Tres Palos Lagoon, Guerrero, Mexico

    Directory of Open Access Journals (Sweden)

    Juan Violante-González

    2008-09-01

    Full Text Available Dormitator is among the most important fish genera in the Mexican Pacific coastal lagoon systems. In Tres Palos Lagoon, the Fat Sleeper Dormitator latifrons is one of the most significant species based on catch volume, although it is only consumed locally. Very little information exists on this species’ parasitofauna. Composition and temporal variation in the metazoan parasite community structure of Dormitator latifrons from Tres Palos Lagoon (99º47’ W, 16º48’ N, Guerrero, Mexico, were determined using seasonal samples taken between April 2000 and June 2002. Ten parasite species (55 817 individuals were recovered from 219 examined hosts. These species included eight helminths (Ascocotyle (Phagicola longa, Echinochasmus leopoldinae, Clinostomum complanatum, Pseudoacanthostomum panamense, Saccocoelioides lamothei, Parvitaenia cochlearii, Contracaecum sp. and Neoechinorhynchus golvani and two crustaceans (Argulus sp. and Ergasilus sp.. Five of the helminth species exhibited seasonal variation in their infection dynamics associated with environmental changes during the dry and rainy seasons. The variations in the infection dynamics generated changes in the community structure over time. Rev. Biol. Trop. 56 (3: 1419-1427. Epub 2008 September 30.Entre abril del 2000 y junio del 2002 se efectuó un estudio para determinar la composición y la variación temporal en la estructura de la comunidad de parásitos metazoarios del popoyote Dormitator latifrons en la laguna de Tres Palos, Guerrero, México, a partir de muestras temporales. Se recuperaron diez especies de parásitos (55 817 individuos de 219 hospederos examinados. Estas especies incluyeron ocho helmintos (Ascocotyle (Phagicola longa, Echinochasmus leopoldinae, Clinostomum complanatum, Pseudoacanthostomum panamense, Saccocoelioides lamothei, Parvitaenia cochlearii, Contracaecum sp. y Neoechinorhynchus golvani y dos crustáceos (Argulus sp. y Ergasilus sp.. Cinco de las especies de

  18. Geotourism, Medical Geology and local development: Cape Verde case study

    Science.gov (United States)

    Rocha, F.; Ferreira da Silva, E.

    2014-11-01

    Geotourism and Geoparks in particular are real opportunities to rural developments promoting the rate decline of unemployment and emigration through engaging the local communities in geopark activities and tourism marketing in the form of adventure tourism, ecotourism, rural tourism and health geotourism. Geotourism is closely linked with Medical Geology. The intake of minerals and chemical elements for food, water, soil (through geophagy) or dust can be accomplished by ingestion, inhalation or dermal absorption. Pelotherapy or “Mudtherapy” is the use of mud/clay for therapeutic applications, internal or external. Cape Verde archipelago is located in Atlantic ocean, 400 km westwards of Senegal coast. Geotourism is being developed, mainly focused on the development of a geopark in Fogo island huge caldera, but also trying to take advantage of their potentialities for Geomedecine. A cooperative program established between Cape Verde University (UCV) and Aveiro University (UA, Portugal) is under way, aiming, on a first stage, to identify Geotouristic potentialities and, on a second stage, to develop products. Geotourism is being developed, mainly focused on the development of a geopark in Fogo isl. huge caldera, but also trying to take advantage of their potentialities for Geomedecine.

  19. 30 years in the Veracruz state coast landscape: Laguna Verde nuclear power station. 1. ed.; 30 anos de paisaje costero veracruzano: Central Nucleoelectrica Laguan Verde

    Energy Technology Data Exchange (ETDEWEB)

    Guevara, S; Moreno Casasola, P; Castillo Campos, G; Dorantes, C; Gonzalez Garcia, F; Halffter, G; Isunza, E; Lot H, A; Mendoza, R; Paradowska, K; Priego, A; Sanchez Vigil, C; Vazquez, G [Comision Federal de Electricidad and Instituto Nacional de Ecologia A.C. (Mexico)

    2008-07-01

    36 years ago one of the most important power projects of Mexico was born; the design and construction of the Nuclear power station Laguna Verde. This project became reality thanks to the commitment of a group of Mexican professionals that gave the best of them for its accomplishment. At that time, there was not in Mexico a legislation that contemplated the environmental protection; nevertheless, the Mexican Constitution anticipates that when in the country there is not legislation for the development of a project, this must adopt the legislation of the country that is selling it. In the specific case of Laguna Verde, the legislation of the United States of America was adopted and in the environmental part it had to issue the first Manifest of Environmental impact, that was called Informe Ambiental para la Contruccion de Laguna Verde en el Estado de Veracruz. This study was performed by several national as well as foreign institutions. Among the most outstanding are the Universidad Nacional Autonoma de Mexico, the Intituto Politecnico Nacional, the Universidad Veracruzana, the Intituto National para la Investigacion de Recursos Biologicos, the Instituto de Ecologia, A.C. With this report, the engineers undertook the task of designing and constructing, the biologists and ecologists to realize the studies to mitigate the effects caused to the environment during the construction and later, during the operation of the Nuclear power station. After 18 years of commercial operation of the power station the present book is completed, in which the results obtained in 1972, when the studies of the environmental report began are compared against the ones obtained throughout this period. It is important to see in the results of the different studies and indicators presented/displayed in this book, that the important changes on the environment are due, to the change of the ground use and the over-exploitation of the natural resources as it happens in almost all the country. The

  20. Feasibility analysis in the expansion proposal of the nuclear power plant Laguna Verde: application of real options, binomial model; Analisis de viabilidad en la propuesta de expansion de la central nucleoelectrica Laguna Verde: aplicacion de opciones reales, modelo binomial

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez I, S.; Ortiz C, E.; Chavez M, C., E-mail: lunitza@gmail.com [UNAM, Facultad de Ingenieria, Circuito Interior, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2011-11-15

    At the present time, is an unquestionable fact that the nuclear electrical energy is a topic of vital importance, no more because eliminates the dependence of the hydrocarbons and is friendly with the environment, but because is also a sure and reliable energy source, and represents a viable alternative before the claims in the growing demand of electricity in Mexico. Before this panorama, was intended several scenarios to elevate the capacity of electric generation of nuclear origin with a variable participation. One of the contemplated scenarios is represented by the expansion project of the nuclear power plant Laguna Verde through the addition of a third reactor that serves as detonator of an integral program that proposes the installation of more nuclear reactors in the country. Before this possible scenario, the Federal Commission of Electricity like responsible organism of supplying energy to the population should have tools that offer it the flexibility to be adapted to the possible changes that will be presented along the project and also gives a value to the risk to future. The methodology denominated Real Options, Binomial model was proposed as an evaluation tool that allows to quantify the value of the expansion proposal, demonstrating the feasibility of the project through a periodic visualization of their evolution, all with the objective of supplying a financial analysis that serves as base and justification before the evident apogee of the nuclear energy that will be presented in future years. (Author)

  1. Loss of coolant acident analyses on Osiris research reactor using the RELAP5 code

    International Nuclear Information System (INIS)

    Soares, Humberto Vitor; Costa, Antonella Lombardi; Lima, Claubia Pereira Bezerra; Veloso, Maria Auxiliadora Fortini

    2011-01-01

    RELAP5/MOD 3.3 code is widely used for thermal hydraulic studies of commercial nuclear power plants. However, several current investigations have shown that RELAP5 code can also be applied for thermal hydraulic analysis of nuclear research systems with good predictions. In this paper, a nodalization of the core and the most important components of the primary cooling system of the OSIRIS reactor developed for RELAP5 thermal hydraulic code are presented as well as results of steady state and transient simulations. OSIRIS has thermal power of 70 MW and it is an open pool type research reactor moderated and cooled by water. The OSIRIS reactor characteristics have been used as a base for the development of a model for the Multipurpose Brazilian Reactor (RMB). The aim of the present work is to investigate the behavior of the core during a loss of coolant accident and the possible damage of the fuel elements due an inadequate heat removal. Although the core coolant reached the saturation point due the large break, the fuel element conditions were out of the damage zone. (author)

  2. Risk-based evaluation tool for safety-related maintenance involving scaffolding

    International Nuclear Information System (INIS)

    Stevens, C.; Azizi, M.; Massman, M.

    1988-01-01

    The US Nuclear Regulatory Commission (NRC) has expressed a general concern that transient materials in and around safety systems at nuclear power plants represent a seismic safety hazard to the plant, in particular, the uncontrolled use of scaffolding during maintenance activities. Currently, most plants perform a seismic safety analysis for all uses of scaffolding near safety-related equipment to determine appropriate tie-down locations, scaffolding reinforcements, etc. This is both time-consuming and, for the most part, unnecessary. A workable engineering solution based on risk analysis techniques has been developed and is being used at the Palo Verde nuclear generating station (PVNGS)

  3. Introduction to SSAC training course

    International Nuclear Information System (INIS)

    Keepin, G.R.

    1982-01-01

    The evolution and perspective of the present series of SSAC courses covering both item-dominant and bulk handling facilities (in the even and odd years respectively) are reviewed. The overall objective of the 1982 SSAC course will be discussed and the structure and format presented, together with a brief survey of the course curriculum. The major course components will be described, including lecture presentations, the workshop session, the tours to Los Alamos, including hands-on equipment demonstrations, and the field trip to the Palo Verde Nuclear Generating Station. Various course materials and physical facilities to be used will be described

  4. EL IMAGINARIO "VERDE" Y EL VERDE URBANO COMO INSTRUMENTO DE CONSUMO INMOBILIARIO: CONFIGURANDO LAS CONDICIONES AMBIENTALES DEL ÁREA METROPOLITANA DE SANTIAGO

    Directory of Open Access Journals (Sweden)

    Felipe Irarrázaval Irarrázaval

    2012-01-01

    Full Text Available La mercantilización e instrumentalización de diversos elementos y procesos naturales ha condicionado perfectas plataformas para la acumulación de riquezas. Esto ha sido posible en la medida que existen las condiciones políticas, sociales y económicas para que suceda. Además, en el caso de las condiciones ambientales urbanas, se suma un "imaginario verde" en un amplio espectro de la población, la cual presenta un gran interés por vivir en espacios dotados de naturaleza. Estas condiciones han determinado que en las ciudades se desarrolle una desigual distribución de las condiciones ambientales, dado que cuando la gestión urbana queda en manos del sector privado, sólo las elites con poder adquisitivo pueden acceder a áreas verdes y al arbolado urbano. La presente investigación busca reconocer a la naturaleza urbana como un "instrumento de consumo" inmobiliario, así como sus implicancias en la distribución de las condiciones ambientales en Santiago de Chile. Para esto se reconoce el espacio urbano en ciudades capitalistas como un eslabón dentro de las plataformas de acumulación de capital. A su vez, se integra la perspectiva de los imaginarios ofertados/empleados por el sector inmobiliario como un tema central para concretar la plataforma de acumulación.

  5. Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt)

    International Nuclear Information System (INIS)

    Castaneda G, M. A.; Maya G, F.; Medel C, J. E.; Cardenas J, J. B.; Cruz B, H. J.; Mercado V, J. J.

    2011-11-01

    By means of the use of the performance evaluation of power system efficiencies (PEPSE) code was modeled the vapor cycle of the nuclear power station of Laguna Verde to reproduce the nuclear plant behavior to conditions of thermal power, licensed at present (2027 MWt); with the purpose of having a base line before the implementation of the project of extended power increase. The model of the gauged vapor cycle to reproduce the nuclear plant conditions makes use of the PEPSE model, design case of the vapor cycle of nuclear power station of Laguna Verde, which has as main components of the model the great equipment of the vapor cycle of Laguna Verde. The design case model makes use of information about the design requirements of each equipment for theoretically calculating the electric power of exit, besides thermodynamic conditions of the vapor cycle in different points. Starting from the design model and making use of data of the vapor cycle measured in the nuclear plant; the adjustment factors were calculated for the different equipment s of the vapor cycle, to reproduce with the PEPSE model the real vapor cycle of Laguna Verde. Once characterized the model of the vapor cycle of Laguna Verde, we can realize different sensibility studies to determine the effects macros to the vapor cycle by the variation of certain key parameters. (Author)

  6. Optimizing soil and water management in dryland farming systems in Cabo Verde

    NARCIS (Netherlands)

    Santos Baptista Costa, Dos I.

    2016-01-01

    “Optimizing Soil and Water Management in Dryland Farming Systems in Cabo Verde”

    Isaurinda Baptista

    Summary

    Soil and land degradation poses a great challenge for sustainable development worldwide and, in Cabo Verde, has strongly affected both

  7. First report of Dirofilaria immitis in the Republic of Cape Verde.

    Science.gov (United States)

    Pereira, Cristina; Almeida, Conceição; Malta, Manuel; Vilaça, Raquel; Payo-Puente, Pablo

    2013-02-18

    In Maio Island, Republic of Cape Verde, a seven-year old mongrel female dog exhibiting severe generalized adenomegaly and a poor body condition was examined during an animal welfare campaign. A blood smear was drawn from peripheral blood collection and several organisms consistent with Dirofilaria immitis microfilariae were identified. Both the antigen test conducted from plasma and the RT-PCR test performed from the blood smear sample were positive for D. immitis. This is, to the best of our knowledge, the first report of D. immitis in Cape Verde. The fact that the dog was autochthonous and had never left the island strongly suggests there might be other animals infected with the parasite. Our finding confirms the existence of the parasite in the canine population and necessarily implies the presence of a competent vector. As a serious cardiopulmonary disease and with the risk of the pathogen spreading rapidly, broader epidemiological studies need to be conducted to determine D. immitis prevalence in the canine population of Maio Island. Copyright © 2012 Elsevier B.V. All rights reserved.

  8. The AMPS 1.5 MW low-pressure compact reactor

    International Nuclear Information System (INIS)

    Hewitt, J.S.

    1987-01-01

    The 1.5-MWt reactor of the Autonomous Marine Power Source (AMPS) is designed to meet the unusual requirements of its first application. To provide for 100 kWe (net) on board self-sustaining manned submersible vehicles, the AMPS reactor must deliver safely, reliably and without direct operator surveillance, its thermal output to freon Rankine-cycle engines at thermodynamically useful temperatures. It must also conform to space and weight limits on the order of less than 50 cubic metres and 70 tonnes. The safety requirements are met by (i) limiting lifetime excess reactivity requirements by incorporation of burnable poison in the U-Zr-H fuel, (ii) maintaining nominal pressures in the light-water primary system at about 1 atmosphere, and (iii) maintaining a large volume of primary reserve coolant at temperature depressed relative to that of the circulating coolant. The latter averages 90 degrees celsius as it is pumped around loops that include the reactor core and the freon evaporators during normal operation. In the event of loss of pumped flow, the system defaults by intrinsic means to core cooling through natural convective exchange with the reserve coolant. In the post-shutdown situation, this passive cooling mode continues to operate regardless of vessel orientation and decay heat is safely dissipated to the sea. The design of the AMPS system, including the reactor, the freon engines, the control and monitoring system, the safety shut-down system and the power source container, are in advanced stages of design. (author)

  9. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  10. The 5th surveillance testing for Kori unit 2 reactor vessel materials

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Kee Ok; Kim, Byoung Chul; Lee, Sam Lai; Choi, Kwon Jae; Gong, Un Sik; Chang, Jong Hwa; Joo, Yong Sun; Ahn, Sang Bok; Hong, Joon Hwa [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2001-03-01

    Surveillance testing for reactor vessel materials is performed in order to evaluate the irradiation embrittlement due to neutrons during operation and set the condition of safe operation of nuclear reactor. The 5th surveillance testing was performed completely by Korea Atomic Energy Research Institute at Taejeon after the capsule was transported from Kori site including its removal from reactor. Fast neutron fluences for capsules were calculated and various testing including mechanical and chemistry analysis were performed in order to evaluate the integrity of Kori unit 2 reactor vessel during the operation until life time. The evaluation results are as follows; Fast neutron fluences for capsules V, R, P, T and N are 2.837E+18, 1.105E+19, 2.110E+19, 3.705E+19 and 4.831E+19n/cm{sup 2}, respectively. The bias factor, the ratio of measurement/calculation, was 0.918 for the 1st through 5th testing and the calculational uncertainty, 11.6% satisfied the requirement of USNRC Reg.Guide DG-1053, 20%. The best estimated neutron fluence for reactor vessel inside surface was 1.898E+19n/cm{sup 2} based on the end of 15th fuel cycle and it was predicted that the fluences of vessel inside surface at 32, 40, 48 and 56EFPY would reach 4.203E+19, 5.232E+19, 6.262E+19 and 7.291E+19n/cm{sup 2} based on the current calculation. The result through this analysis for Kori unit 2 showed that there would be no problem for the pressurized thermal shock(PTS) during the operation until design life. 49 refs., 35 figs., 48 tabs. (Author)

  11. Design of 90-mgd wastewater reclamation plant

    International Nuclear Information System (INIS)

    Cain, C.B.; Kluesener, J.W.; Lazarus, E.

    1981-01-01

    Ninety MGD of municipal secondary effluent is to be reclaimed for use as cooling water in the Palo Verde Nuclear Generating Station in Arizona. The water reclamation plant design criteria are presented for nitrification, lime-soda softening, filtration, and sludge processing. In-pipe storage is used for flow equalization. Forced air down-draft trickling filters with computer-controlled recycle are used for nitrification. Effluent recirculation is used to maintain constant sludge blanket dept in the upflow solids contact clarifier softening units. An influent flow-splitting, gravity-backwash, dual-media filter is used for final suspended solids removal. Rheological data was used in the hydraulic design of sludge piping. Computerized automatic flushing also aids in preventing sludge pumping problems. Reclamation plant design and construction are integrated in one Engineering-Procurement-Construction project conducted by a single company. 5 refs

  12. Community-based tourism in Cape Verde - a case study

    OpenAIRE

    Tomas Lopez-Guzman; Osvaldo Borges; Ana Maria Castillo-Canalejo

    2011-01-01

    Community-based tourism is taking its place in the world as an alternative to traditional tourist destinations, especially in developing countries. This form of tourism allows for greater contact with the local community and for the tourist to experience new sensations while enabling the economic and social development of the geographic area. In this paper, the results of fieldwork carried out in the island of Fogo (Cape Verde) are presented, assessing the opinion and perception tourists visi...

  13. Flooding studies of proposed repository locations in the Palo Duro Basin of the Texas Panhandle

    International Nuclear Information System (INIS)

    1985-04-01

    This report contains the results of flooding studies of those stream channels that drain the proposed locations of a high-level nuclear-waste repository in Deaf Smith and Swisher Counties, Texas. Included are computations of the flood hydrographs and water surface profiles of the 100-year, 500-year, and probable maximum floods for Palo Duro Creek, Tule Creek, and Pleasant Draw. The hydrographs were produced according to the method of the Soil Conservation Service for ungaged watersheds, and the computations were made with computer programs developed by the US Army Corps of Engineers. The flood hydrographs were computed with the HEC-1 Flood Hydrograph Package and the water surface elevations with the HEC-2 Water Surface Profiles program. 76 refs., 19 figs., 16 tabs

  14. Evaluation of the reduction of boron-10 in the control rods in the BWR of the Laguna Verde Central, through steady state calculations

    International Nuclear Information System (INIS)

    Montes T, J.L.; Perusquia, R.; Hernandez, J.L.; Ramirez S, J.R.

    2003-01-01

    One of the more important aspects related with the safety and economy in the operation of a nuclear power reactor, it is without a doubt the control of the reactivity. During the normal operation of a reactor of boiling water (BWR-Boiling Water Reactor), the control of the reactivity in the nucleus it is strongly determined by the efficiency of the control rods. In the case of the Laguna Verde Nuclear power station (CNLV) the nucleus of the reactors has 109 control rods grouped in 4 sets. The CNLV at the moment uses the CCC method (Control Cell Core) in the design of the cycle. With this method only the A2 group is used for the control of the reactivity at full power. With the purpose of quantifying the effect of the decrease of the burnable poison (B 4 C) of the control rods and in particular to the effect due to the postulated lost of 10% of Boron 10, it was carried out a series of calculations of the nucleus in stationary state by means of the system of HELIOS/CM-PRESTO codes. In this work the main derived results of these 3D simulations(three dimensions) of the reactors of the CNLV are presented. It was analyzed the one behavior of the infinite neutron multiplication factor (K infinite ), at fuel assemble cell level used in an equilibrium cycle for the CNLV. It was also analyzed the effect in the shutdown margin (ShutDown Margin- SDM) in cold condition CZP (Cold Zero Power). Its are also included those results of the ARI cases (All Rods In) and SRO (Strong Rod Out). From the cases in condition HFP (Hot Full Power) the behavior of the effective multiplication factor (K eff ) is presented. (Author)

  15. Simulation of the automatic depressurization system (Ads) for a boiling water reactor (BWR) based on RELAP; Simulacion del sistema de despresurizacion automatica (ADS) para un reactor de agua en ebullicion (BWR) basado en RELAP

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez G, C.; Chavez M, C., E-mail: ces.raga@gmail.com [UNAM, Facultad de Ingenieria, Circuito Interior, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2012-10-15

    The automatic depressurization system (Ads) of the boiling water reactor (BWR) like part of the emergency cooling systems is designed to liberate the vapor pressure of the reactor vessel, as well as the main vapor lines. At the present time in the Engineering Faculty, UNAM personnel works in the simulation of the Laguna Verde reactor based on the nuclear code RELAP/SCADAP and in the incorporation to the same of the emergency cooling systems. The simulation of the emergency cooling systems began with the inclusion of two hydrodynamic volumes, one source and another drain, and the incorporation of the initiation logic for each emergency system. In this work is defined and designed a simplified model of Ads of the reactor, considering a detail level based on the main elements that compose it. As tool to implement the proposed model, the RELAP code was used. The simulated main functions of Ads are centered in the quick depressurization of the reactor by means of the vapor discharge through the relief/safety valves to the suppression pool, and, in the event of break of the main vapor line, the reduction of the vessel pressure operates for that the cooling systems of the core to low pressure (Lpcs and Lpci) they can begin their operation. (Author)

  16. Propuesta de mejoramiento tecnológico de techos verdes para el clima tropical andino

    Directory of Open Access Journals (Sweden)

    Alejandro Gómez Cubillos

    2018-01-01

    Full Text Available La gestión de riesgos por el aumento de la escorrentía superficial en zonas urbanas requiere intervención desde múltiples enfoques, ambientales, sanitarios, sociales y económicas. La infraestructura verde aporta soluciones de creciente interés por sus beneficios ambientales y potencial aprovechamiento económico. Este artículo propone un mejoramiento tecnológi-co para la adaptación de los techos verdes al clima tropical andino, en términos de su com-portamiento hidrológico, para lo cual se desarrolló un montaje experimental con seis módu-los de techos verdes extensivos y un módulo testigo (solo cubierta. El montaje experimental permitió la obtención de datos de 21 eventos de precipitación, modificando la configuración de dos factores experimentales, tipo de planta con seis variaciones y altura de sustrato con tres variaciones y tres eventos más para verificar el efecto de la variación de la pendiente de la cubierta, como tercer factor. Los datos obtenidos se procesaron para el cálculo de las va-riables hidrológicas de interés (precipitación, escorrentía, duración del evento, tiempo ante-rior seco, que expresan las características del evento y los indicadores del comportamiento hidrológico (coeficientes de escorrentía basado en volumen Cv y en el caudal pico Cp y tiem-po de retraso K y su análisis estadístico permitió identificar cuáles factores experimentales tienen o no influencia significativa en dichos indicadores. Finalmente, se desarrollaron herramientas para la simulación de variables e indicadores hidrológicos a partir de series de precipitación externas y su implementación en una herramienta de diseño que seleccione las configuraciones de techos verdes que presenten el mejor comportamiento hidrológico.

  17. Desarrollo de alimentos tipo snack de bajo contenido graso a partir de discos de manzana verde

    OpenAIRE

    Tavera Quiroz, María José

    2015-01-01

    Esta investigación se basó en el desarrollo de productos tipo snack bajos en grasa a partir de manzana verde Granny Smith (Malus domestica). Se desarrollaron snacks a partir de manzanas verdes estudiando diferentes alternativas de cocción (fritado, horneado o su combinación) con el objetivo de obtener productos con menor contenido graso que los tradicionales pero con las propiedades que los consumidores valoran en los mismos, como el color y la textura crocante. Para ello se analizó...

  18. Entre la publicidad social y la publicidad ambiental: una revisión de la contrapublicidad verde de Greenpeace

    OpenAIRE

    Martín Villar, Sara

    2015-01-01

    Este trabajo presenta un análisis y evolución de la publicidad social, sus efectos, características y tendencias en nuestra sociedad. Se conceptualiza la publicidad verde como medio de denuncia de lo social, y se realiza una recopilación de las acciones de Greenpeace y su contrapublicidad para detener la deforestación de los bosques de Indonesia. Una aproximación a los conceptos de publicidad social, publicidad ambiental, publicidad verde y contrapublicidad. Grado en Publicidad y Relacione...

  19. Mesa Verde: A Study of Man in an Agricultural Setting. Library Packet.

    Science.gov (United States)

    Community Health Service (DHEW/PHS), Bethesda, MD.

    This collection of secondary readings contains general information about the ecology of living space, and specific information about the prehistory ecology of Mesa Verde, Colorado. There is also a section on how anthropologists use trees to date artifacts. A related document is indexed as ED 001 721. (AWW)

  20. Area environmental characterization report of the Dalhart and Palo Duro basins in the Texas Panhandle. Volume I. Dalhart Basin

    International Nuclear Information System (INIS)

    1982-09-01

    This area report describes the environmental characteristics of the Dalhart and Palo Duro basins of the Texas Panhandle portion of the Permian basin. Both basins are rather sparsely populated, and the overall population is decreasing. The economic base is centered on agribusiness and manufacturing. Most of the potentially conflicting land uses in both basins (i.e., parks, historic sites) occupy small land areas, with the exception of a national grassland in the Dalhart and military air training routes in both basins. Ground transportation in the Dalhart basin is adequate, and it is well developed in the Palo Duro basin. In both basins irrigation constitutes the principal water use, and groundwater is the principal source. However, the dominant aquifer, the Ogallala, is being depleted. Both basins consist primarily of grasslands, rangelands, and agricultural areas. No critical terrestrial or aquatic habitats have been identified in the basins, though several endangered, threatened, or rare terrestrial species occur in or near the basins. Aquatic resources in both basins are limited because of the intermittent availability of water and the high salt content of some water bodies. Playa lakes are common, though usually seasonal or rain dependent. The climate of the area is semiarid, with low humidity, relatively high wind speeds, and highly variable prcipitation. Restrictive dispersion conditions are infrequent. National ambient secondary air quality standards for particulates are being exceeded in the area, largely because of fugitive dust, although there are some particulate point sources

  1. Techos verdes: una alternativa ecológica

    Directory of Open Access Journals (Sweden)

    Maureen Trebilcock Kelly

    2001-06-01

    Full Text Available Es un hecho que estamos pavimentando nuestro Planeta. Durante el siglo XX, hemos construido aceleradamente ciudades y carreteras, cubriendo y destruyendo, en este proceso, nuestra tierra. Este hecho es más evidente en las áreas urbanas, que aparecen sobrepavimentadas, donde la vegetación cubre apenas un tercio de la superficie, comparado con un 75 a 95% de las áreas rurales. En Chile, las áreas urbanas crecen sin límite aparente, especialmente nuestra capital, con escasez de áreas verdes y con un alarmante aumento en los niveles de contaminación atmosférica y acústica.

  2. Technical assistance in relationship with the reloading analysis of the Laguna Verde Unit 2 reactor. Executive abstract; Asistencia tecnica en relacion con el analisis de recargas de la CNLV U-2

    Energy Technology Data Exchange (ETDEWEB)

    Alonso V, G.; Castro B, M.; Gallegos E, R.; Hernandez L, H.; Montes T, J.L.; Ortiz S, J. J.; Perusquia C, R. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1993-11-15

    The objective of the report was to carry out a comparative analysis of costs of energy generation among the designs GE9B of General Electric, 9X9-IX of SIEMENS and SVEA-96 of ABB ATOM, proposed to be used as recharge fuel in the Unit 2 of the Laguna Verde Nuclear Power station. (Author)

  3. MARKETING VERDE NAS OPERAÇÕES DE AGENTES DE LOGÍSTICA DE DISTRIBUIÇÃO: ESTUDO DE CASO EM EMPRESA DE BASE TECNOLÓGICA

    Directory of Open Access Journals (Sweden)

    Tiago Hennemann Hilario da Silva

    2013-01-01

    Full Text Available Este estudo tem por objetivo explorar a utilização do marketing verde nas operações de agentes da logística do processo de distribuição. O referencial teórico utilizado foi baseado em duas subáreas de conhecimento: marketing verde em serviços e cadeia de suprimentos verde. O objeto de estudo foi uma organização de médio porte do ramo de tecnologia e fornecedora de soluções em automação industrial. A coleta de dados empíricos envolveu um estudo de caso único, a pesquisa do tipo exploratória qualitativa e a aplicação dos métodos observação participante e entrevistas semiestruturadas. Os dados coletados foram examinados por meio da técnica de análise de conteúdo. Os resultados revelaram que ações de marketing verde, nos agentes da logística de distribuição, são perceptíveis aos olhos de todos os participantes do processo, tanto internos como externos à organização, principalmente, aos clientes finais. A pesquisa identificou também necessidade de ações internas na organização e de melhorias nos processos “verdes” dos agentes de logística no processo de distribuição. Palavras-chave: Cadeia de suprimentos verde. Logística de distribuição. Marketing em serviços. Marketing verde.

  4. Application of RELAP5-3D code for thermal analysis of the ADS reactor core

    International Nuclear Information System (INIS)

    Fernandes, Gustavo Henrique Nazareno

    2018-01-01

    Nuclear power is essential to supply global energy demand. Therefore, in order to use nuclear fuel more efficiently, more efficient nuclear reactors technologies researches have been intensified, such as hybrid systems, composed of particle accelerators coupled into nuclear reactors. In order to add knowledge to such studies, an innovative reactor design was considered where the RELAP5-3D thermal-hydraulic analysis code was used to perform a thermal analysis of the core, either in stationary operation or in situations transitory. The addition of new kind of coolants, such as, liquid salts, among them Flibe, lead, lead-bismuth, sodium, lithium-bismuth and lithium-lead was an important advance in this version of the code, making possible to do the thermal simulation of reactors that use these types of coolants. The reactor, object of study in this work, is an innovative reactor, due to its ability to operate in association with an Accelerator Driven System (ADS), considered a predecessor system of the next generation of nuclear reactors (GEN IV). The reactor selected was the MYRRHA (Multi-purpose Hybrid Research Reactor for High tech Applications) due to the availability of data to perform the simulation. In the modeling of the reactor with the code RELAP5-3D, the core was simulated using nodules with 1, 7, 15 and 51 thermohydraulic channels and eutectic lead-bismuth (LBE) as coolant. The parameters, such as, pressure, mass flow and coolant and heat structure temperature were analyzed. In addition, the thermal behavior of the core was evaluated by varying the type of coolant (sodium) in substitution for the LBE of the original design using the model with 7 thermohydraulic channels. The results of the steady-state calculations were compared with data from the literature and the proposed models were verified certifying the ability of the RELAP5-3D code to simulate this innovative reactor. After this step, it was analysed cases of transients with loss of coolant flow

  5. The volcanic and geochemical development of São Nicolau, Cape Verde Islands

    DEFF Research Database (Denmark)

    Duprat, Helene Inga; Holm, Paul Martin; Sherson, Jacob Friis

    2007-01-01

    We present 34 new age results from 40 Ar/39 Ar incremental heating analyses of groundmass separates from volcanic rocks from São Nicolau, Cape Verde. Combining the age results with field observations, we show that the volcanic activity that formed the island occurred in four separate stages: 1: >6...

  6. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes; Analisis de eventos internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Apendices

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1995-07-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and.analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  7. Vantagens e desvantagens da utilização de peles-verdes em edificações residenciais em Porto Alegre segundo seus moradores

    Directory of Open Access Journals (Sweden)

    Mariene Valesan

    Full Text Available Pele-verde (trepadeiras recobrindo fachadas de uma edificação, muro ou outro elemento vertical é uma técnica de baixo impacto ambiental e com benefícios para a edificação e seu entorno. O presente trabalho analisa peles-verdes encontradas em edifícios residenciais em Porto Alegre, a partir da percepção de seus moradores, como os objetivos de gerar um registro da utilização dessa técnica e de discutir suas principais vantagens e desvantagens. A metodologia de pesquisa valeu-se de entrevistas em profundidade, estruturadas por questionários, aplicadas junto a moradores de 38 edificações (unifamiliares e multifamiliares revestidas por peles-verdes. As peles-verdes analisadas são do tipo autoaderentes, utilizando-se das espécies Ficus pumila e Parthenocissus tricuspidata. Os entrevistados confirmaram como principais vantagens da técnica o embelezamento da paisagem, a integração do ambiente urbano e da natureza, os efeitos positivos para o bem-estar do homem e a melhoria da temperatura interna das edificações. A principal desvantagem citada foi o trabalho de manutenção do revestimento vegetal. Assim, esta pesquisa indica que a pele-verde é uma técnica que tem o potencial de melhorar o ambiente urbano e, por isso, o desenvolvimento de pesquisa sobre ário.

  8. A subregional analysis of epidemiologic and genetic characteristics of influenza A(H1N1)pdm09 in Africa: Senegal, Cape Verde, Mauritania, and Guinea, 2009-2010.

    Science.gov (United States)

    Dia, Ndongo; Ndiaye, Mbayame Niang; Monteiro, Maria de Lourdes; Koivogui, Lamine; Bara, Mohamed Ould; Diop, Ousmane M

    2013-05-01

    During the pandemic 2009 episode, we conducted laboratory-based surveillance in four countries from West Africa: Senegal, Mauritania, Cape Verde, and Guinea. Specimens were obtained from 3,155 patients: 2,264 patients from Senegal, 498 patients from Cape Verde, 227 patients from Mauritania, and 166 patients from Guinea; 911 (28.9%) patients were positive for influenza, 826 (90.7%) patients were positive for influenza A, and 85 (9.3%) patients were positive for influenza B. Among the influenza A positives, 503 (60.9%) positives were H1N1pdm09, 314 (38.0%) positives were H3N2, and 9 (1.1%) positives were seasonal H1N1. The highest detection rate for seasonal influenza viruses (17.1%) occurred in the 5-14 years age group. However, for A(H1N1)pdm09, the detection rate was highest in the 15-24 years age group (35.8%). Based on the present study data, the timeline of detection of A(H1N1)pdm09 viruses in these four countries should be Cape Verde, Guinea, Mauritania, and finally, Senegal. Genetic and antigenic analyses were performed in some isolates.

  9. Safety evaluation of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Delgado G, J.L.

    1991-01-01

    The present work describe the licensing process for the first nuclear power plant built in Mexico, it presents the difficulties found during the several years of construction and tests until the phrase a level of safety equivalent to that of the country of origin of the nuclear steam supply system could be applicable to Laguna Verde, at least from the point of view of the mexican regulatory body, and also that this statement could be signed for the inspectors of international organizations. (author)

  10. MARKETING VERDE COMO PROPENSA VANTAGEM COMPETITIVA SUSTENTÁVEL DE UMA ORGANIZAÇÃO

    Directory of Open Access Journals (Sweden)

    Cleber Vasconcelos Moreira

    2016-01-01

    Full Text Available O crescimento da preocupação com as consequências ambientais diante do consumo desenfreado tem levantado à questão da necessidade de um consumo consciente. Diante disso, um novo segmento de mercado tem sido encontrado, sendo denominados consumidores ecologicamente conscientes ou consumidores Verdes. Neste novo cenário valoriza-se a flexibilidade, a velocidade nos processos de mudanças e inovação, as competências em utilizar recursos escassos, além da sensibilidade de perceber novas tendências de mercado à frente dos concorrentes e a capacidade de elaborar e fomentar ofertas em função das antecipações dos desejos e necessidades dos clientes. A dificuldade de previsão tornou-se ponto chave. É neste momento que se observa a relevância na valorização das preocupações de caráter ambiental como recursos na obtenção de vantagem competitiva. Essas duas nuancem Vantagem Competitiva e Marketing Verde levaram a este estudo. Deste modo, foi realizado um estudo multicaso com duas empresas do setor industrial localizadas no Espirito Santo. Os resultados comprovaram que as empresas, mesmo a que investe em meio ambiente, não o faz de forma estratégica. Ainda não há uma ampla utilização do tema como fonte recurso para ser um diferencial frente ao concorrente. Ou seja, as empresas analisadas ainda não entendem o Marketing Verde como vantagem competitiva.

  11. Popular conceptions of schizophrenia in Cape Verde, Africa Concepções populares da esquizofrenia em Cabo Verde, África

    Directory of Open Access Journals (Sweden)

    Mário Dinis Mateus

    2005-06-01

    Full Text Available INTRODUCTION: It has been well documented that schizophrenia presents a better clinical course in developing countries. Although there are many epidemiological studies showing this association, little research has been conducted to investigate the local representation systems for schizophrenia in these countries. OBJECTIVES: This study focuses on cultural factors of schizophrenia, namely the local representation systems for the disease, as well as what is locally understood as deviant behavior and its acceptability, and mechanisms of social-cultural insertion or exclusion of patients with schizophrenia in Cape Verde, Africa. METHODS: Randomized open interviews were carried out with the relatives of patients under treatment at the mental health out patient service of the Batista de Sousa Hospital (São Vicente Island between the years 1994 and 1995. Interviews dealt with patients' life histories and disease related to problems, strategies employed by the family to cope with such problems, and comments on the social and family burden. RESULTS: 20 interviews with close relatives of 10 patients were analyzed. The study focused on three main categories explaining schizophrenia: "tired head" (cabeça cansada, "nervous" (nervoso, and supernatural categories (like "sorcery" or "witchcraft". The interviewees expressed their opinions, either explicitly or not, on whether their relatives truly had a disease. CONCLUSION: Characteristics of local categories for schizophrenia found in Cape Verde can be regarded as a less stigmatized way of dealing with the disease. It is reasonable to suppose that the understanding of such cultural factors could lead to better outcomes in the treatment for schizophrenia in this country, and also in others, where similar conditions can be identified.INTRODUÇÃO: Tem sido bem documentado que a esquizofrenia apresenta um melhor curso clínico em países em desenvolvimento. Ainda que haja muitos estudos epidemiol

  12. Importancia de los ensayos de compactibilidad, resistencia en verde y humedad en mezclas de moldeo

    Directory of Open Access Journals (Sweden)

    Alain Valdés-Crúz

    2000-03-01

    Full Text Available A partir de la teoría del agua rígida y de los trabajos desarrollados por Wenninger se alcanzó una concepción más clara sobre los mecanismos de aglutinación en verde de las mezclas de moldeo. Al mismo tiempo, se presta una particular atención a los ensayos de compactibilidad, resistencia a la compresión en verde y humedad, como índices más representativos de dicho proceso de aglutinación. Se demuestra la relación que existe entre estos ensayos y las consecuencias de los trabajos de Wenninger. Se hace particular énfasis en el ensayo de compactibilidad por considerarlo de aplicación limitada.

  13. O papel coadjuvante das catequinas do chá verde (Camellia sinensis na redução da adiposidade

    Directory of Open Access Journals (Sweden)

    Mirza de Souza Conceição

    2015-03-01

    Full Text Available O chá é uma das bebidas mais consumidas no mundo, vem sendo utilizado pela população como coadjuvante no tratamento da redução de peso, uma vez que aumenta a termogênese e em muitos casos promove a saciedade. O objetivo deste trabalho foi mostrar como as catequinas do chá verde auxiliam no tratamento da obesidade. Foram realizadas buscas por artigos científicos nas bases de dados Science Direct, Google Acadêmico, Scielo, BVS, Medline e Wilson. Os artigos escolhidos foram publicados no período de 2000 a 2014. Observa-se que o tratamento da obesidade envolve necessariamente a reeducação alimentar, o aumento da atividade física e eventualmente, o uso de algumas medicações auxiliares. Outra alternativa, é o uso de fitoterápicos como por exemplo o chá verde. Estudos têm mostrado que este chá, que é obtido pela infusão da erva Camellia sinensis é rico em catequinas, responsáveis na redução de peso, pois promovem a termogênese e aumentam a saciedade. A epigalocatequina (EGCG, é a catequina mais abundante e mais forte do chá verde. É importante ressaltar que o chá usado de maneira inadequada pode causar hepatotoxicidade. O uso do chá associado a um plano alimentar equilibrado pode trazer benefícios à saúde além da perda de peso. Porém os estudos ainda não são conclusivos, sendo necessários mais estudos para que possa confirmar a eficácia do chá verde na obesidade e a quantidade a ser utilizada. Entretanto, a reeducação alimentar, exercício físico continuam sendo os fatores mais importantes no tratamento da obesidade, Onde o consumo de chá verde deve está associado a uma alimentação saudável.

  14. Modernization of the turbo in the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Cobos, A.; Gonzalez, J. J.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This paper describes the first phase of the project.

  15. Steady state and LOCA analysis of Kartini reactor using RELAP5/SCDAP code: The role of passive system

    Science.gov (United States)

    Antariksawan, Anhar R.; Wahyono, Puradwi I.; Taxwim

    2018-02-01

    Safety is the priority for nuclear installations, including research reactors. On the other hand, many studies have been done to validate the applicability of nuclear power plant based best estimate computer codes to the research reactor. This study aims to assess the applicability of the RELAP5/SCDAP code to Kartini research reactor. The model development, steady state and transient due to LOCA calculations have been conducted by using RELAP5/SCDAP. The calculation results are compared with available measurements data from Kartini research reactor. The results show that the RELAP5/SCDAP model steady state calculation agrees quite well with the available measurement data. While, in the case of LOCA transient simulations, the model could result in reasonable physical phenomena during the transient showing the characteristics and performances of the reactor against the LOCA transient. The role of siphon breaker hole and natural circulation in the reactor tank as passive system was important to keep reactor in safe condition. It concludes that the RELAP/SCDAP could be use as one of the tool to analyse the thermal-hydraulic safety of Kartini reactor. However, further assessment to improve the model is still needed.

  16. Nodalization effects on RELAP5 results related to MTR research reactor transient scenarios

    Directory of Open Access Journals (Sweden)

    Khedr Ahmed

    2005-01-01

    Full Text Available The present work deals with the anal y sis of RELAP5 results obtained from the evaluation study of the total loss of flow transient with the deficiency of the heat removal system in a research reactor using two different nodalizations. It focuses on the effect of nodalization on the thermal-hydraulic evaluation of the re search reactor. The analysis of RELAP5 results has shown that nodalization has a big effect on the predicted scenario of the postulated transient. There fore, great care should be taken during the nodalization of the reactor, especially when the avail able experimental or measured data are insufficient for making a complete qualification of the nodalization. Our analysis also shows that the research reactor pool simulation has a great effect on the evaluation of natural circulation flow and on other thermal-hydraulic parameters during the loss of flow transient. For example, the on set time of core boiling changes from less than 2000 s to 15000 s, starting from the beginning of the transient. This occurs if the pool is simulated by two vertical volumes in stead of one vertical volume.

  17. Mesa Verde: A Study of Man in an Agricultural Setting. Student Manual.

    Science.gov (United States)

    Community Health Service (DHEW/PHS), Bethesda, MD.

    This student manual contains information and guides to assist the secondary student in functioning as an archeologist. Included are fables, pictures for analysis, a time line and description of the pre-history of Mesa Verde, Colorado. The manual concludes with artifact identification word sheets. A related document is ED 001 722. (AWW)

  18. CV-Dust: Atmospheric aerosol in the Cape Verde region: carbon and soluble fractions of PM10

    Science.gov (United States)

    Pio, C.; Nunes, T.; Cardoso, J.; Caseiro, A.; Custódio, D.; Cerqueira, M.; Patoilo, D.; Almeida, S. M.; Freitas, M. C.

    2012-04-01

    Every year, billions of tons of eroded mineral soils from the Saharan Desert and the Sahel region, the largest dust source in the world, cross Mediterranean towards Europe, western Asia and the tropical North Atlantic Ocean as far as the Caribbean and South America. Many aspects of the direct and indirect effects of dust on climate are not well understood and the bulk and surface chemistry of the mineral dust particles determines interactions with gaseous and other particle species. The quantification of the magnitude of warming or cooling remains open because of the strong variability of the atmospheric dust burden and the lack of representative data for the spatial and temporal distribution of the dust composition. CV-Dust is a project that aims at provide a detailed data on the size distribution and the size-resolved chemical and mineralogical composition of dust emitted from North Africa using a natural laboratory like Cape Verde. This archipelago is located in an area of massive dust transport from land to ocean, and is thus ideal to set up sampling devices that are able to characterize and quantify dust transported from Africa. Moreover, Cape Verde's future economic prospects depend heavily on the encouragement of tourism, therefore it is essential to elucidate the role of Saharan dust may play in the degradation of Cape Verde air quality. The main objectives of CV-Dust project are: 1) to characterize the chemical and mineralogical composition of dust transported from Africa by setting up an orchestra of aerosol sampling devices in the strategic archipelago of Cape Verde; 2) to identify the sources of particles in Cape Verde by using receptor models; 3) to elucidate the role Saharan dust may play in the degradation of Cape Verde air quality; 4) to model processes governing dust production, transport, interaction with the radiation field and removal from the atmosphere. Here we present part of the data obtained throughout the last year, involving a set of more

  19. Application of new control technology during the maintenance of equipment in the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Ojeda R, M. A.

    2008-01-01

    In the nuclear power plant of Laguna Verde, in normal operation and recharges are carried out activities of preventive maintenance and corrective to different equipment, due to the one displacement of radioactive materials from the vessel of the reactor until the one system of vapor, different radiation levels are generated (from low until very high) in the circuits of vapor and water, the particles can be incrusted on those interior surfaces of the pipes and equipment, creating this way a potential risk of contamination and exhibition during the maintenance of equipment. To help to optimize the dose to the personnel the use of new technology the has been implemented which besides contributing an absolute control of the work, it offers bigger comfort to the one worker during the development of their work, also contributing a supervision more effective of the same one. Using the captured and processed information of the work developed you can use for the personnel's capacitation and feedback of the work for the continuous improvement of the same one. During a reduction of programmed power and normal operation are carried out maintenance correctives and specific works to preserve the readiness and ability of the equipment and with this to maintain the security of the nuclear power plant. The development of the theme it is showing the advances and commitments of personnel to take to excellence to the nuclear power plant of Laguna Verde showing to the obtained results of the dose and benefits of 2 works carried out in the nuclear power plant where tools ALARA were applied as well as the use of the new technology (Video Equipment of Tele dosimetry and Audio 'VETA') in works carried out in the building of purification level 10.15, change and cuts of filter of the prefilters of system G16, as well as,the retirement and transfer for its decay of High Integrity Container (HIC) of the building of purification level -0.55 to the Temporary Warehouse in Site. Works of high

  20. Simulation of the automatic depressurization system (Ads) for a boiling water reactor (BWR) based on RELAP

    International Nuclear Information System (INIS)

    Ramirez G, C.; Chavez M, C.

    2012-10-01

    The automatic depressurization system (Ads) of the boiling water reactor (BWR) like part of the emergency cooling systems is designed to liberate the vapor pressure of the reactor vessel, as well as the main vapor lines. At the present time in the Engineering Faculty, UNAM personnel works in the simulation of the Laguna Verde reactor based on the nuclear code RELAP/SCADAP and in the incorporation to the same of the emergency cooling systems. The simulation of the emergency cooling systems began with the inclusion of two hydrodynamic volumes, one source and another drain, and the incorporation of the initiation logic for each emergency system. In this work is defined and designed a simplified model of Ads of the reactor, considering a detail level based on the main elements that compose it. As tool to implement the proposed model, the RELAP code was used. The simulated main functions of Ads are centered in the quick depressurization of the reactor by means of the vapor discharge through the relief/safety valves to the suppression pool, and, in the event of break of the main vapor line, the reduction of the vessel pressure operates for that the cooling systems of the core to low pressure (Lpcs and Lpci) they can begin their operation. (Author)