  1. Optimal Risk-Based Inspection Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Rangel-Ramirez, Jose G.; Sørensen, John Dalsgaard

    2008-01-01

    , inspection and maintenance activities are developed. This paper considers aspects of inspection and maintenance planning of fatigue prone details in jacket and tripod types of wind turbine support structures. Based oil risk-based inspection planning methods used for oil & gas installations, a framework......Wind turbines for electricity production have increased significantly the last years both in production capability and size. This development is expected to continue also in the coining years. The Support structure for offshore wind turbines is typically a steel structure consisting of a tower...... for optimal inspection and maintenance planning of offshore wind turbines is presented. Special aspects for offshore wind turbines are considered: usually the wind loading are dominating the wave loading, wake effects in wind farms are important and the reliability level is typically significantly lower than...

  2. Risk-based optimization of pipe inspections in large underground networks with imprecise information

    International Nuclear Information System (INIS)

    Mancuso, A.; Compare, M.; Salo, A.; Zio, E.; Laakso, T.

    2016-01-01

    In this paper, we present a novel risk-based methodology for optimizing the inspections of large underground infrastructure networks in the presence of incomplete information about the network features and parameters. The methodology employs Multi Attribute Value Theory to assess the risk of each pipe in the network, whereafter the optimal inspection campaign is built with Portfolio Decision Analysis (PDA). Specifically, Robust Portfolio Modeling (RPM) is employed to identify Pareto-optimal portfolios of pipe inspections. The proposed methodology is illustrated by reporting a real case study on the large-scale maintenance optimization of the sewerage network in Espoo, Finland. - Highlights: • Risk-based approach to optimize pipe inspections on large underground networks. • Reasonable computational effort to select efficient inspection portfolios. • Possibility to accommodate imprecise expert information. • Feasibility of the approach shown by Espoo water system case study.

  3. Risk-Based Inspection and Maintenance Planning Optimization of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    A risk-based inspection planning (RBI) approach applied to offshore wind turbines (OWT) is presented, based on RBI methodology developed in the last decades in the oil and gas industry. In wind farm (IWF) and single-alone locations are considered using a code-established turbulence models including...

  4. Risk-based methodology for USNRC inspections

    International Nuclear Information System (INIS)

    Wong, S.M.; Holahan, G.M.; Chung, J.W.; Johnson, M.R.

    1995-01-01

    This paper describes the development and trial applications of a risk-based methodology to enhance the inspection processes for US nuclear power plants. Objectives of risk-based methods to complement prescriptive engineering approaches in US Nuclear Regulatory Commission (USNRC) inspection programs are presented. Insights from time-dependent risk profiles of plant configurational from Individual Plant Evaluation (IPE) studies were integrated to develop a framework for optimizing inspection efforts in NRC regulatory initiatives. Lessons learned from NRC pilot applications of the risk-based methodology for evaluation of the effectiveness of operational risk management programs at US nuclear power plant sites are also discussed

  5. Study of a risk-based piping inspection guideline system.

    Science.gov (United States)

    Tien, Shiaw-Wen; Hwang, Wen-Tsung; Tsai, Chih-Hung

    2007-02-01

    A risk-based inspection system and a piping inspection guideline model were developed in this study. The research procedure consists of two parts--the building of a risk-based inspection model for piping and the construction of a risk-based piping inspection guideline model. Field visits at the plant were conducted to develop the risk-based inspection and strategic analysis system. A knowledge-based model had been built in accordance with international standards and local government regulations, and the rational unified process was applied for reducing the discrepancy in the development of the models. The models had been designed to analyze damage factors, damage models, and potential damage positions of piping in the petrochemical plants. The purpose of this study was to provide inspection-related personnel with the optimal planning tools for piping inspections, hence, to enable effective predictions of potential piping risks and to enhance the better degree of safety in plant operations that the petrochemical industries can be expected to achieve. A risk analysis was conducted on the piping system of a petrochemical plant. The outcome indicated that most of the risks resulted from a small number of pipelines.

  6. Risk based inspection for atmospheric storage tank

    Science.gov (United States)

    Nugroho, Agus; Haryadi, Gunawan Dwi; Ismail, Rifky; Kim, Seon Jin

    2016-04-01

    Corrosion is an attack that occurs on a metallic material as a result of environment's reaction.Thus, it causes atmospheric storage tank's leakage, material loss, environmental pollution, equipment failure and affects the age of process equipment then finally financial damage. Corrosion risk measurement becomesa vital part of Asset Management at the plant for operating any aging asset.This paper provides six case studies dealing with high speed diesel atmospheric storage tank parts at a power plant. A summary of the basic principles and procedures of corrosion risk analysis and RBI applicable to the Process Industries were discussed prior to the study. Semi quantitative method based onAPI 58I Base-Resource Document was employed. The risk associated with corrosion on the equipment in terms of its likelihood and its consequences were discussed. The corrosion risk analysis outcome used to formulate Risk Based Inspection (RBI) method that should be a part of the atmospheric storage tank operation at the plant. RBI gives more concern to inspection resources which are mostly on `High Risk' and `Medium Risk' criteria and less on `Low Risk' shell. Risk categories of the evaluated equipment were illustrated through case study analysis outcome.

  7. Risk-based inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1995-01-01

    A multidiscipline research programme was developed in the USA to establish risk-based inspections for NPP structures and equipment components. Based on this US research effort, the risk-based procedure for developing inspection guidelines for NPPs is described. The procedure includes the definition of systems, qualitative risk assessment, qualitative risk analysis and development of the inspection programme. The method, when adopted and modified, is recommended also for risk-based inspections of structures and equipment of WWER-type NPPs. A pilot application of the method to unit 1 of the Surry NPP is summarized. (Z.S.) 1 tab., 1 fig., 5 refs

  8. Risk Based Inspection Planning of Ageing Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Ersdal, Gerhard

    2008-01-01

    . Different approaches for updating inspection plans for older installations are considered in order to achieve decreased inspection intervals as the structure are ageing. The most promising method consists in increasing the rate of defects / crack initiation at the end of the expected lifetime. Different...

  9. Benefits of Risk Based Inspection Planning for Offshore Structures

    DEFF Research Database (Denmark)

    Straub, D.M.; Goyet, J.; Sørensen, John Dalsgaard

    2006-01-01

    The economical benefits of applying risk-based inspection planning (RBI) for offshore structures subject to fatigue are evaluated based on experiences from past industrial projects. To this end, the factors influencing the cost of inspection, repair and failure of structures are discussed......, the financial benefit of RBI is assessed....

  10. Guidelines for risk-based fish inspection

    OpenAIRE

    2015-01-01

    Fish and fishery products are nutritious and healthy and are an important source of food and livelihood for many millions of people worldwide. Fish inspection is concerned with ensuring that the consumer has access to safe and nutritious fish and fish products, whether the fish is from domestic sources of supply, imported or to be exported to consumers in another country. The present guidelines will assist fish inspectors to carry out these responsibilities--Publisher's description.

  11. Risk Based Optimal Fatigue Testing

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Faber, M.H.; Kroon, I.B.

    1992-01-01

    Optimal fatigue life testing of materials is considered. Based on minimization of the total expected costs of a mechanical component a strategy is suggested to determine the optimal stress range levels for which additional experiments are to be performed together with an optimal value...

  12. Experience with the implementation of a risk-based ISI program and inspection qualification

    International Nuclear Information System (INIS)

    Chapman, O.J.V.

    1996-01-01

    Rolls Royce and Associates (RRA) are the Design Authority (DA) for Nuclear Steam Raising Plant (NSRP) used for the Royal Naval Nuclear Fleet. Over the past seven years RRA, with support from the Ministry of Defense, has developed and implemented a risk based in-service inspection (RBISI) strategy for the NSRP. Having used risk as a means of optimizing where to inspect, an inspection qualification (IQ) process has now been put in place to ensure that proposed inspections deliver the expected gains assumed. This qualification process follows very closely that currently being put forward by the European Network on Inspection Qualification (ENIQ)

  13. Risk-based inspection in the context of nuclear power plants

    International Nuclear Information System (INIS)

    Soares, Wellington A.; Vasconcelos, Vanderley de; Rabello, Emerson G.

    2015-01-01

    Nuclear power plant owners have to consider several aspects like safety, availability, costs and radiation exposure during operation of nuclear power plants. They also need to demonstrate to regulatory bodies that risk assessment and inspection planning processes are being implemented in effective and appropriate manner. Risk-Based Inspection (RBI) is a methodology that, unlike time-based inspection, involves a quantitative assessment of both failure probability and consequence associated with each safety-related item. A correctly implemented RBI program classifies individual equipment by its risks and prioritizes inspection efforts based on this classification. While in traditional deterministic approach, the inspection frequencies are constant, in the RBI approach the inspection interval for each item depends on the risk level. Regularly, inspection intervals from RBI result in risk levels lower or equal than deterministic inspection intervals. According to the literature, RBI solutions improve integrity and reduce costs through a more effective inspection. Risk-Informed In-service Inspection (RI-ISI) is the equivalent term used in the nuclear area. Its use in nuclear power plants around world is briefly reviewed in this paper. Identification of practice methodologies for performing risk-based analyses presented in this paper can help both Brazilian nuclear power plant operator and regulatory body in evaluating the RI-ISI technique feasibility as a tool for optimizing inspections within nuclear plants. (author)

  14. Risk-based inspection in the context of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Soares, Wellington A.; Vasconcelos, Vanderley de; Rabello, Emerson G., E-mail: soaresw@cdtn.br, E-mail: vasconv@cdtn.br, E-mail: egr@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    Nuclear power plant owners have to consider several aspects like safety, availability, costs and radiation exposure during operation of nuclear power plants. They also need to demonstrate to regulatory bodies that risk assessment and inspection planning processes are being implemented in effective and appropriate manner. Risk-Based Inspection (RBI) is a methodology that, unlike time-based inspection, involves a quantitative assessment of both failure probability and consequence associated with each safety-related item. A correctly implemented RBI program classifies individual equipment by its risks and prioritizes inspection efforts based on this classification. While in traditional deterministic approach, the inspection frequencies are constant, in the RBI approach the inspection interval for each item depends on the risk level. Regularly, inspection intervals from RBI result in risk levels lower or equal than deterministic inspection intervals. According to the literature, RBI solutions improve integrity and reduce costs through a more effective inspection. Risk-Informed In-service Inspection (RI-ISI) is the equivalent term used in the nuclear area. Its use in nuclear power plants around world is briefly reviewed in this paper. Identification of practice methodologies for performing risk-based analyses presented in this paper can help both Brazilian nuclear power plant operator and regulatory body in evaluating the RI-ISI technique feasibility as a tool for optimizing inspections within nuclear plants. (author)

  15. Approaching application of risk-based inspection to ASME code section XI

    International Nuclear Information System (INIS)

    Hedden, Owen F.

    1995-01-01

    This paper will describe current efforts within the ASME Boiler and Pressure Vessel Committee's Subcommittee on Nuclear Inservice Inspection to introduce risk-based technology to optimize inservice inspection of nuclear power plants. The subcommittee is responsible for the content of ASME Boiler and Pressure Vessel Code Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. The paper will first provide the historical background for the inspection program currently in Section XI. It will then describe the development of new technology through the ASME Center for Research and Technology Development program. Next, the work now going on in two of the groups under the Section XI committee will be described in detail. Each of these two efforts is directed toward the application of new risk-based inspection technology to nuclear piping systems. Finally, the directions of additional research and applications of the technology will be discussed. (author)

  16. Risk-based inspection--Development of guidelines

    International Nuclear Information System (INIS)

    1993-07-01

    Effective inservice inspection programs can play a significant role in minimizing equipment and structural failures. Most of the current inservice inspection programs for light water reactor (LWR) nuclear power plant components are based on experience and engineers' qualitative judgment. These programs include only an implicit consideration of risk, which combines the probability of failure of a component under its operation and loading conditions and the consequences of such failure, if it occurs. This document recommends appropriate methods for establishing a risk-based inspection program for LWR nuclear power plant components. The process has been built from a general methodology (Volume 1) and has been expanded to involve five major steps: defining the system; evaluating qualitative risk assessment results; using this and information from plant probabilistic risk assessments to perform a quantitative risk analysis; selecting target failure probabilities; and developing an inspection program for components using economic decision analysis and structural reliability assessment methods

  17. Application of risk-based inspection methods for cryogenic equipment

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    Risk-based Inspection (RBI) is widely applied across the world as part of Pressure Equipment Integrity Management, especially in the oil and gas industry, to generally reduce costs compared with time-based approaches and assist in assigning resources to the most critical equipment. One of the challenges in RBI is to apply it for low temperature and cryogenic applications, as there are usually no degradation mechanisms by which to determine a suitable probability of failure in the overall risk assessment. However, the assumptions used for other degradation mechanisms can be adopted to determine, qualitatively and semi-quantitatively, a consequence of failure within the risk assessment. This can assist in providing a consistent basis for the assumptions used in ensuring adequate process safety barriers and determining suitable sizing of relief devices. This presentation will discuss risk-based inspection in the context of cryogenic safety, as well as present some of the considerations for the risk assessme...

  18. Risk-based inspection and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, Kazunari; Nagai, Satoshi; Akikuni, Yasunari; Fujiwara, Toshihiro; Furuya, Kenichiro; Matsumoto, Shigeru; Takagi, Kentaro; Kawabata, Taro

    2004-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants

  19. Risk Based Inspection of Gas-Cooling Heat Exchanger

    Directory of Open Access Journals (Sweden)

    Dwi Priyanta

    2017-09-01

    Full Text Available On October 2013, Pertamina Hulu Energi Offshore North West Java (PHE – ONWJ platform personnel found 93 leaking tubes locations in the finfan coolers/ gas-cooling heat exchanger. After analysis had been performed, the crack in the tube strongly indicate that stress corrosion cracking was occurred by chloride. Chloride stress corrosion cracking (CLSCC is the cracking occurred by the combined influence of tensile stress and a corrosive environment. CLSCC is the one of the most common reasons why austenitic stainless steel pipework or tube and vessels deteriorate in the chemical processing, petrochemical industries and maritime industries. In this thesis purpose to determine the appropriate inspection planning for two main items (tubes and header box in the gas-cooling heat exchanger using risk based inspection (RBI method. The result, inspection of the tubes must be performed on July 6, 2024 and for the header box inspection must be performed on July 6, 2025. In the end, RBI method can be applicated to gas-cooling heat exchanger. Because, risk on the tubes can be reduced from 4.537 m2/year to 0.453 m2/year. And inspection planning for header box can be reduced from 4.528 m2/year to 0.563 m2/year.

  20. Risk-Based School Inspections: Impact of Targeted Inspection Approaches on Dutch Secondary Schools

    Science.gov (United States)

    Ehren, Melanie C.; Shackleton, Nichola

    2016-01-01

    In most countries, publicly funded schools are held accountable to one inspectorate and are judged against agreed national standards. Many inspectorates of education have recently moved towards more proportional risk-based inspection models, targeting high-risk schools for visits, while schools with satisfactory student attainment levels are…

  1. Risk-based prioritization and its application to inspection of valves in the water sector

    International Nuclear Information System (INIS)

    Marlow, David R.; Beale, David J.; Mashford, John S.

    2012-01-01

    Isolation valves facilitate the effective operation and maintenance of water supply networks, but their sheer number presents a significant asset management challenge. If left unmanaged, valve reliability issues can become widespread. Inspections provide a means of increasing reliability, but a survey of industry practices indicated that some utilities did not have such a program in place. To improve asset management and reduce business risk exposure, such utilities need an effective means of commencing inspection programs. From a theoretical perspective, risk concepts provide a means of optimizing maintenance effort. However, in the face of poor data on reliability or condition, pragmatic approaches to risk-based prioritization are needed. One such approach, risk indexing, is considered in this paper. Background on the research is presented, including the application of risk-based inspection concepts within the water sector. The development of a risk indexing scheme is then investigated, drawing on two industry workshops in which the analytical hierarchy process was used to set relative weights. It is concluded that risk indexing provides the basis for a rational prioritization process in the absence of data on valve reliability or condition. - Highlights: ► Importance of valve inspections to water network reliability. ► Theoretical perspective of risk concepts that provide a means of optimizing inspection programs. ► Pragmatic approaches to prioritization in light of poor valve data. ► Development and assessment of a risk index scheme. ► Use of the analytical hierarchy process to set relative weights of risk factors.

  2. Risk-based optimization of land reclamation

    International Nuclear Information System (INIS)

    Lendering, K.T.; Jonkman, S.N.; Gelder, P.H.A.J.M. van; Peters, D.J.

    2015-01-01

    Large-scale land reclamations are generally constructed by means of a landfill well above mean sea level. This can be costly in areas where good quality fill material is scarce. An alternative to save materials and costs is a ‘polder terminal’. The quay wall acts as a flood defense and the terminal level is well below the level of the quay wall. Compared with a conventional terminal, the costs are lower, but an additional flood risk is introduced. In this paper, a risk-based optimization is developed for a conventional and a polder terminal. It considers the investment and residual flood risk. The method takes into account both the quay wall and terminal level, which determine the probability and damage of flooding. The optimal quay wall level is found by solving a Lambert function numerically. The terminal level is bounded by engineering boundary conditions, i.e. piping and uplift of the cover layer of the terminal yard. It is found that, for a representative case study, the saving of reclamation costs for a polder terminal is larger than the increase of flood risk. The model is applicable to other cases of land reclamation and to similar optimization problems in flood risk management. - Highlights: • A polder terminal can be an attractive alternative for a conventional terminal. • A polder terminal is feasible at locations with high reclamation cost. • A risk-based approach is required to determine the optimal protection levels. • The depth of the polder terminal yard is bounded by uplifting of the cover layer. • This paper can support decisions regarding alternatives for port expansions.

  3. GASVOL 18'' gas pipeline - risk based inspection study

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernoey, Ola H.; Etterdal, Birger A. [Det Norske Veritas (DNV), Oslo (Norway); Guarize, Rosimar; Oliveira, Luiz F.S. [Det Norske Veritas (DNV) (Brazil); Faertes, Denise; Dias, Ricardo [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes a risk based approach and inspection planning as part of the Pipeline Integrity Management (PIM) system for the 95.5 km long 18'' GASVOL gas pipeline in the South eastern region of Brazil transporting circa 5 000 000 m3 dry gas per day. Pipeline systems can be subject to several degradation mechanisms and inspection and monitoring are used to ensure system integrity. Modern pipeline regulations and codes are normally based on a core safety or risk philosophy. The detailed design requirements presented in design codes are practical interpretations established so as to fulfill these core objectives. A given pipeline, designed, constructed and installed according to a pipeline code is therefore the realization of a structure, which, along its whole length, meets the applicable safety objectives of that code. The main objective of Pipeline Integrity Management (PIM) is to control and document the integrity of the pipeline for its whole service life, and to do this in a cost-effective manner. DNV has a specific approach to RBI planning, starting with an initial qualitative assessment where pipelines and damage type are ranked according to risk and potential risk reduction by an inspection and then carried forward to a quantitative detailed assessment where the level of complexity and accuracy can vary based on availability of information and owner needs. Detailed assessment requires significant effort in data gathering. The findings are dependent upon the accuracy of the inspection data, and on DNV's interpretation of the pipeline reference system and simplifications in the inspection data reported. The following specific failure mechanisms were investigated: internal corrosion, external corrosion, third party interference, landslides and black powder. RBI planning, in general words, is a 'living process'. In order to optimize future inspections, it is essential that the analyses utilize the most recent information regarding

  4. Regulatory requirements related to risk-based inspection and maintenance

    International Nuclear Information System (INIS)

    Schroeder, H.C.; Kauer, R.

    2003-01-01

    By asking the question why new inspection and maintenance strategies have to be developed one can often be made aware that there is always a continue demand for cost reduction and optimisation. In this framework, general trends involving staff reduction, outsourcing, benchmarking etc. can often be observed nearly everywhere. Since inspection and maintenance are amongst the few cost factors, which could be actively influenced in the short term, and in combination with the recent regulatory fundamental changes (e.g. PED) yielding to considerably greater responsibilities for the operator of a plant, also the demand for documentation and comprehensibility of measures will increase. (orig.)

  5. Risk based inspection experience from the European chemical- and petrochemical industries

    International Nuclear Information System (INIS)

    Kristensen, Hans; Jeppesen, Leif; Larsen, Bjarne; Kim, Na Yon

    2001-01-01

    As an inspection vendor with 60 years of experience and with more than 25 years of experience as manufacturer of the Automated Ultrasonic NDT systems, the P-scan systems, FORCE Institute is continuously analysing the market for NDT. This is done to assure that both the equipment product line and the service mix provided by FORCE Institute are meeting the requirements from the industry today and in the future. The concept of Risk Based Inspection Programmes were adopted early by the offshore industry and has in the recent years been adopted by many other industries as a reliable and cost efficient way of maintaining a production facility. A Risk/Reliability Based Inspection Programme is a 'living organism' that constantly needs information if it shall be of any value and NDT information is only one type of information that is required. The NDT information required is normally related to corrosion/base material information and weld integrity information. NDT as an integrated part of a plants maintenance system is, in Europe, currently influenced by the following tendencies which all are related to 'Risk Based Inspection': · Increased use of Base-Line Inspections · Reduction in the use of repeated inspections(qualitative- instead of quantitative Inspections). · Inspection results are fed directly into the plant maintenance system. · Fitness-for-Purpose acceptance criteria instead of conventional acceptance criteria. As repeatability and accuracy is a key issue for the data, automated ultrasonic inspection is increasingly used as an alternative to manual ultrasonic inspection, but due to the physical size of most automated ultrasonic inspection systems the gain in productivity has not been as significant as the gain in repeatability and accuracy. In this paper some of FORCE Institute's practical experiences with examinations carried out in connection with Risk Based Inspection is used to illustrate the above described tendencies. Not only examples using automated

  6. New approach for risk based inspection of H2S based Process Plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Sharma, Pavan K.; Santosh, T.V.; Hari Prasad, M.; Vaze, K.K.

    2014-01-01

    Highlights: • Study looks into improving the consequence evaluation in risk based inspection. • Ways to revise the quantity factors used in qualitative approach. • New approach based on computational fluid dynamics along with probit mathematics. • Demonstrated this methodology along with a suitable case study for the said issue. - Abstract: Recent trend in risk informed and risk based approaches in life management issues have certainly put the focus on developing estimation methods for real risk. Idea of employing risk as an optimising measure for in-service inspection, termed as risk based inspection, was accepted in principle from late 80s. While applying risk based inspection, consequence of failure from each component needs to be assessed. Consequence evaluation in a Process Plant is a crucial task. It may be noted that, in general, the number of components to be considered for life management is very large and hence the consequence evaluation resulting from their failures (individually) is a laborious task. Screening of critical components is usually carried out using simplified qualitative approach, which primarily uses influence factors for categorisation. This necessitates logical formulation of influence factors and their ranges with a suitable technical basis for acceptance from regulators. This paper describes application of risk based inspection for H 2 S based Process Plant along with the approach devised for handling the influence factor related to the quantity of H 2 S released

  7. Development of the Risk-Based Inspection Techniques and Pilot Plant Activities

    International Nuclear Information System (INIS)

    Phillips, J.H.

    1997-01-01

    Risk-based techniques have been developed for commercial nuclear power plants. System boundaries and success criteria is defined using the probabilistic risk analysis or probabilistic safety analysis developed to meet the individual plant evaluation. Final ranking of components is by a plant expert panel similar to the one developed for maintenance rule. Components are identified as being high risk-significant or low-risk significant. Maintenance and resources are focused on those components that have the highest risk-significance. The techniques have been developed and applied at a number of pilot plants. Results from the first risk-based inspection pilot plant indicates that safety due to pipe failure can be doubled while the inspection reduced to about 80% when compared with current inspection programs. The reduction in inspection reduces the person-rem exposure resulting in further increases in safety. These techniques have been documented in publication by the ASME CRTD

  8. Comparison of API 510 pressure vessels inspection planning with API 581 risk-based inspection planning approaches

    International Nuclear Information System (INIS)

    Shishesaz, Mohammad Reza; Nazarnezhad Bajestani, Mohammad; Hashemi, Seyed Javad; Shekari, Elahe

    2013-01-01

    To ensure mechanical integrity, all pressure vessels shall be inspected at the intervals provided in inspection codes or based on a risk-based inspection (RBI) assessment. The RBI assessment may allow previously established inspection intervals to be extended. This paper describes the methodology, analysis and results of two RBI studies conducted on 293 pressure vessel components in two crude oil distillation units. Based on API RBI methodology in API 581 (2008), risk target concept was used for determining inspection dates. It was shown that when thinning is the major active damage, the RBI recommended intervals are as long as twice the API 510 intervals. This paper summarizes that, as a fundamental step in the risk calculation, RBI has a more defined methodology for evaluating equipment for multiple damage mechanisms and a more defined approach to specify the use of other inspection technologies beyond the traditional visual, ultrasonic, and radiography tests. -- Highlights: • RBI calculated inspection intervals are as long as twice of API 510 inspection code. • Two case studies verified the advantage of RBI in inspection planning. • RBI is a more reliable methodology when evaluating multiple damage mechanisms. • Damage factor calculations can be used for determining RSFa value in FFS assessments

  9. Risk-based priorities for inspection of nuclear pressure boundary components at selected LWRs

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Gore, B.F.; Doctor, S.R.; Smith, B.W.

    1990-03-01

    Data from existing probabilistic risk assessments for eight representative nuclear power plants were used to identify and prioritize the most relevant systems to plant safety. The objective was to assess current in-service inspection requirements for pressure boundary systems and components, and to develop recommendations for improvements. This study demonstrates the feasibility of using risk-based methods to develop plant-specific inspection plans. Results for the eight representative plants also indicate generic trends that suggest improvements in current inspection plans now based on priorities set in accordance with code definitions of Class 1, 2, and 3 systems. 2 refs., 4 figs., 5 tabs

  10. Risk-based priorities for inspection of nuclear pressure boundary components at selected LWRs

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Gore, B.F.; Doctor, S.R.; Smith, B.W.

    1990-01-01

    Data from existing probabilistic risk assessments for eight representative nuclear power plants were used to identify and prioritize the most relevant systems to plant safety. The objective of this paper is to assess current in-service inspection requirements for pressure boundary systems and components, and to develop recommendations for improvements. This study demonstrates the feasibility of using risk-based methods to develop plant-specific inspection plans. Results for the eight representative plants also indicate generic trends that suggest improvements in current inspection plans now based on priorities set in accordance with code definitions of Class 1, 2, and 3 systems

  11. Risk analysis of heat recovery steam generator with semi quantitative risk based inspection API 581

    Science.gov (United States)

    Prayogo, Galang Sandy; Haryadi, Gunawan Dwi; Ismail, Rifky; Kim, Seon Jin

    2016-04-01

    Corrosion is a major problem that most often occurs in the power plant. Heat recovery steam generator (HRSG) is an equipment that has a high risk to the power plant. The impact of corrosion damage causing HRSG power plant stops operating. Furthermore, it could be threaten the safety of employees. The Risk Based Inspection (RBI) guidelines by the American Petroleum Institute (API) 58 has been used to risk analysis in the HRSG 1. By using this methodology, the risk that caused by unexpected failure as a function of the probability and consequence of failure can be estimated. This paper presented a case study relating to the risk analysis in the HRSG, starting with a summary of the basic principles and procedures of risk assessment and applying corrosion RBI for process industries. The risk level of each HRSG equipment were analyzed: HP superheater has a medium high risk (4C), HP evaporator has a medium-high risk (4C), and the HP economizer has a medium risk (3C). The results of the risk assessment using semi-quantitative method of standard API 581 based on the existing equipment at medium risk. In the fact, there is no critical problem in the equipment components. Damage mechanisms were prominent throughout the equipment is thinning mechanism. The evaluation of the risk approach was done with the aim of reducing risk by optimizing the risk assessment activities.

  12. Risk analysis of heat recovery steam generator with semi quantitative risk based inspection API 581

    International Nuclear Information System (INIS)

    Prayogo, Galang Sandy; Haryadi, Gunawan Dwi; Ismail, Rifky; Kim, Seon Jin

    2016-01-01

    Corrosion is a major problem that most often occurs in the power plant. Heat recovery steam generator (HRSG) is an equipment that has a high risk to the power plant. The impact of corrosion damage causing HRSG power plant stops operating. Furthermore, it could be threaten the safety of employees. The Risk Based Inspection (RBI) guidelines by the American Petroleum Institute (API) 58 has been used to risk analysis in the HRSG 1. By using this methodology, the risk that caused by unexpected failure as a function of the probability and consequence of failure can be estimated. This paper presented a case study relating to the risk analysis in the HRSG, starting with a summary of the basic principles and procedures of risk assessment and applying corrosion RBI for process industries. The risk level of each HRSG equipment were analyzed: HP superheater has a medium high risk (4C), HP evaporator has a medium-high risk (4C), and the HP economizer has a medium risk (3C). The results of the risk assessment using semi-quantitative method of standard API 581 based on the existing equipment at medium risk. In the fact, there is no critical problem in the equipment components. Damage mechanisms were prominent throughout the equipment is thinning mechanism. The evaluation of the risk approach was done with the aim of reducing risk by optimizing the risk assessment activities.

  13. Risk analysis of heat recovery steam generator with semi quantitative risk based inspection API 581

    Energy Technology Data Exchange (ETDEWEB)

    Prayogo, Galang Sandy, E-mail: gasandylang@live.com; Haryadi, Gunawan Dwi; Ismail, Rifky [Department of Mechanical Engineering, Diponegoro University, Semarang (Indonesia); Kim, Seon Jin [Department of Mechanical & Automotive Engineering of Pukyong National University (Korea, Republic of)

    2016-04-19

    Corrosion is a major problem that most often occurs in the power plant. Heat recovery steam generator (HRSG) is an equipment that has a high risk to the power plant. The impact of corrosion damage causing HRSG power plant stops operating. Furthermore, it could be threaten the safety of employees. The Risk Based Inspection (RBI) guidelines by the American Petroleum Institute (API) 58 has been used to risk analysis in the HRSG 1. By using this methodology, the risk that caused by unexpected failure as a function of the probability and consequence of failure can be estimated. This paper presented a case study relating to the risk analysis in the HRSG, starting with a summary of the basic principles and procedures of risk assessment and applying corrosion RBI for process industries. The risk level of each HRSG equipment were analyzed: HP superheater has a medium high risk (4C), HP evaporator has a medium-high risk (4C), and the HP economizer has a medium risk (3C). The results of the risk assessment using semi-quantitative method of standard API 581 based on the existing equipment at medium risk. In the fact, there is no critical problem in the equipment components. Damage mechanisms were prominent throughout the equipment is thinning mechanism. The evaluation of the risk approach was done with the aim of reducing risk by optimizing the risk assessment activities.

  14. The API methodology for risk-based inspection (RBI) analysis for the petroleum and petrochemical industry

    International Nuclear Information System (INIS)

    Reynolds, J.T.

    1998-01-01

    Twenty-one petroleum and petrochemical companies are currently sponsoring a project within the American Petroleum Institute (API) to develop risk-based inspection (RBI) methodology for application in the refining and petrochemical industry. This paper describes that particular RBI methodology and provides a summary of the three levels of RBI analysis developed by the project. Also included is a review of the first pilot project to validate the methodology by applying RBI to several existing refining units. The failure for pressure equipment in a process unit can have several undesirable effects. For the purpose of RBI analysis, the API RBI program categorizes these effects into four basic risk outcomes: flammable events, toxic releases, major environmental damage, and business interruption losses. API RBI is a strategic process, both qualitative and quantitative, for understanding and reducing these risks associated with operating pressure equipment. This paper will show how API RBI assesses the potential consequences of a failure of the pressure boundary, as well as assessing the likelihood (probability) of failure. Risk-based inspection also prioritizes risk levels in a systematic manner so that the owner-user can then plan an inspection program that focuses more resources on the higher risk equipment; while possibly saving inspection resources that are not doing an effective job of reducing risk. At the same time, if consequence of failure is a significant driving force for high risk equipment items, plant management also has the option of applying consequence mitigation steps to minimize the impact of a hazardous release, should one occur. The target audience for this paper is engineers, inspectors, and managers who want to understand what API Risk-Based Inspection is all about, what are the benefits and limitations of RBI, and how inspection practices can be changed to reduce risks and/or save costs without impacting safety risk. (Author)

  15. Development of a risk-based in-service inspection program for an LMR

    International Nuclear Information System (INIS)

    King, R.W.; Buschman, H.W.

    1996-01-01

    The emerging application of risk-based assessment technology to the operation and maintenance of nuclear power plants holds considerable promise for improving efficiency and reducing operating costs. Experimental Breeder Reactor II (EBR-II) is a liquid-metal-cooled fast reactor (LMR) that operated for 30 yr before shutting down in September 1994 due to program termination. Prior to the shutdown of EBR-II, an in-service inspection (ISI) program was developed that exploited certain advantages of the LMR design. For example, it demonstrated passive response to plant upset events, low-pressure primary coolant, and compatibility of the coolant and reactor materials. This ISI program was based on work currently being done by an American Society of Mechanical Engineers (ASME) Research Task Force on Risk-Based Inspection

  16. Research on the Application of Risk-based Inspection for the Boiler System in Power Plant

    Science.gov (United States)

    Li, Henan

    2017-12-01

    Power plant boiler is one of the three main equipment of coal-fired power plants, is very tall to the requirement of the safe and stable operation, in a significant role in the whole system of thermal power generation, a risk-based inspection is a kind of pursuit of security and economy of unified system management idea and method, can effectively evaluate equipment risk and reduce the operational cost.

  17. Development of a risk-based inservice inspection program for a liquid metal reactor

    International Nuclear Information System (INIS)

    King, R.W.; Buschman, H.W.

    1996-01-01

    The emerging application of risk-based assessment technology to the operation and maintenance of nuclear power plants holds considerable promise for improving efficiency and reducing operating costs. EBR-II is liquid-metal-cooled fast reactor which operated for thirty years before shutting down in September 1994 due to program termination. Prior to the shutdown of EBR-II, an in-service inspection (ISI) program was developed that exploited certain advantages of the liquid-metal reactor design, e.g., demonstrated passive response to plant upset events, low pressure primary coolant and compatibility of the coolant and reactor materials. Many of the systems cannot be inspected due to inaccessibility of the components. However, application of a risk-based approach provided the basis for reducing or eliminating inspections in some areas that would otherwise be required. Development and implementation of the risk-based ISI program was interrupted by the DOE-mandated shutdown of EBR-II, so the potential benefits of this approach in terms of reduced O and M costs have yet to be realized. Through the development of this program, however it is clear that there is potential for substantial cost-savings while improving the risk-profile of the facility through this approach

  18. Application of the risk based inspection in chemical and nuclear installations: a critical evaluation

    International Nuclear Information System (INIS)

    Sousa, Anna Leticia Barbosa de

    2004-01-01

    Risk-based Inspection (RBI) has arisen as an opportunity for the industry to give a specific treatment to items as equipment integrity, failures consequences and the level of risk of each piece of equipment in the inspection programs definitions. Risk-based inspection programs are replacing the traditional ones based on prescriptive requirements, for both the oil and nuclear industries. The aim of this thesis is to demonstrate how the nuclear industry has gotten over several difficulties in implementing risk-based programs considering that its safety design and regulations have traditionally been based on deterministic and prescriptive criteria and requirements. During the development of the work, the study has shown how the absence of a rigid regulation favored the dissemination of RBI diffusion in the oil industry, mainly in the USA, where such industries do not face those difficulties found by the European plants, as long as it is well known that in Europe there are complex interrelations among documents from different countries with diversity of regulation procedures. (author)

  19. 76 FR 65165 - Importation of Plants for Planting; Risk-Based Sampling and Inspection Approach and Propagative...

    Science.gov (United States)

    2011-10-20

    ..., this 14th day of October 2011. Kevin Shea, Acting Administrator, Animal and Plant Health Inspection... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2011-0092] Importation of Plants for Planting; Risk-Based Sampling and Inspection Approach and Propagative Monitoring and...

  20. Application of risk-based methods for inspection of nuclear power plant components

    International Nuclear Information System (INIS)

    Balkey, K.R.

    1992-01-01

    In-service inspections (ISIs) can play a significant role in minimizing equipment and structural failures. All aspects of inspections, i.e., objectives, method, timing, and the acceptance criteria for detected flaws can affect the probability of component failure. Where ISI programs exist, they are primarily based on prior experience and engineering judgment. At best, some include an implicit consideration of risk (probability of failure multiplied by consequence). Since late 1988, a multidisciplined American Society of Mechanical Engineers (ASME) Research Task Force on Risk-Based Inspection Guidelines has been addressing the general question of how to formally incorporate risk considerations into plans and requirements for the ISI of components and structural systems. The task force and steering committee that guided the project have concluded that appropriate analytical methods exist for evaluating and quantifying risks associated with pressure boundary and structural failures. With the support of about a dozen industry and government organizations, the research group has recommended a general methodology for establishing a risk-based inspection program that could be applied to any nuclear system or structural system

  1. Risk-based Inspection Guide for the Susquehanna Station HPCI system

    International Nuclear Information System (INIS)

    Travis, R.; Higgins, J.; Gunther, W.; Shier, W.

    1992-11-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A system Risk-based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Susquehanna Steam Electric Station (SSES) which is operated by Pennsylvania Power ampersand Light (PP ampersand L). Included in this S-RIG is a discussion of the role of HPCI in mitigating accidents and a presentation of PRA-based failure modes which could prevent proper operation of the system. The S-RIG uses industry operating experience, including plant-specific illustrative examples, to augment the basic PRA failure modes. It is designed to be used as a reference for both routine inspections and the evaluation of the significance of component failures

  2. Management of Microbiologically Influenced Corrosion in Risk-Based Inspection Analysis

    DEFF Research Database (Denmark)

    Skovhus, Torben Lund; Andersen, Erlend S.; Hillier, Elisabeth

    2018-01-01

    Operating offshore oil and gas production facilities is often associated with high risk. To manage the risk, operators commonly use aids to support decision making in the establishment of a maintenance and inspection strategy. Risk-based inspection (RBI) analysis is widely used in the offshore...... industry as a means to justify the inspection strategy adopted. The RBI analysis is a decision-making technique that enables asset managers to identify the risk related to failure of their most critical systems and components, with an effect on safety, environmental, and business-related issues. Risk...... influenced corrosion (MIC) is a degradation mechanism that has received increased attention from corrosion engineers and asset operators in the past decades. In this paper, the most recent models that have been developed to assess the impact of MIC on asset integrity will be presented and discussed. From...

  3. Update on the EPRI power generation risk-based inservice inspection pilot plant studies

    International Nuclear Information System (INIS)

    Gosselin, S.R.

    1997-01-01

    The scope for ASME Section XI ISI programs is largely based on deterministic results contained in design stress reports. These reports are normally very conservative and may not be an accurate representation of failure potential. Service experience has shown that failures are due to either corrosion or fatigue and typically occur in areas not included in the plant's ISI program. Consequently, nuclear plants are devoting significant resources to inspection programs that provide minimum benefit. As an alternative, significant industry attention has been devoted to the application of risked-based selection criteria in order to determine the scope of inservice inspection (ISI) programs at nuclear power plants. Preliminary EPRI studies indicate that the application of these techniques will allow operating nuclear plants to reduce the examination scope of current ISI programs by as much as 60 to 80%, significantly reduce costs, and continue to maintain high nuclear plant safety standards

  4. A strategy for the risk-based inspection of pressure safety valves

    International Nuclear Information System (INIS)

    Chien, C.-H.; Chen, C.-H.; Chao, Y.J.

    2009-01-01

    The purpose of a pressure safety valve (PSV) is to protect the life and safety of pressure vessels in a pressurized system. If a weakened PSV fails to function properly, a catastrophic event might occur if no other protective means are provided. By utilizing the as-received test data and statistical analysis of the aging conditions of PSVs in lubricant process units, a risk-based inspection (RBI) system was developed in this study. First of all, the characteristics of PSV were discussed from the practical viewpoint of engineering inspection and maintenance. The as-received test data, which shows obvious PSV damage, will be separated from the data used in the following statistical analysis. Then, the relationship between the aging conditions and the corresponding PSV parameters was analyzed by using the statistical technique-analysis of variance (ANOVA). Finally, a strategy for semi-quantitative RBI is proposed. Also, a definitive estimated inspection interval for every PSV is suggested. The outcome indicated most of the risks result from a few PSVs, for which the corresponding inspection intervals will be shorter than the 2 years in accordance with relative standards and local government regulations

  5. Application of risk based inspection as a part of life management of nuclear power plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Babar, A.K.; Saraf, R.K.; Kushwaha, H.S.; Venkat Raj, V.

    2002-01-01

    Importance, Inspection Importance measure etc. are employed for prioritisation of systems as well as components for In-Service Inspection. After the identification of the critical systems/components, Failure Mode Effect Analysis (FMEA) is carried out for each piping segment. It is essential to identify the prominent failure modes and causes in order to establish the inspection items. Risk Matrix is designed with different categories, depending on the CDF values and degradation mechanisms for determining the inspection interval. Each segment is assigned the appropriate category depending on its effect on change in CDF and degradation mechanisms. Since inspection will be planned on segments based on its contribution towards risk, an optimal utilisation of inspection resource could be ensured. Again another outcome of failure probability estimation is the assessment of residual life depending on crack growth phenomena which can be modelled using fracture mechanics methodology. Various aspects are involved like operating history, inspection results etc. which can change the failure probability values and subsequently the risk ranking. Pilot studies have been conducted to apply Risk Informed In-Service Inspection on a typical Indian PHWR. Risk Ranking of systems has been done based on importance measures. Also Risk Matrix has been applied to rank various piping segments for inspection. As a part of this analysis, a software has been developed to carry out these studies. This paper discusses in detail the application of Risk informed In-service Inspection on a typical Indian PHWR and presents the features of the software. (author)

  6. Point-based POMDP Risk Based Inspection of Offshore Wind Substructures

    DEFF Research Database (Denmark)

    Morato, Pablo G.; Mai, Quang A.; Rigo, Philippe

    2018-01-01

    This article presents a novel methodology to select the optimal maintenance strategy of an offshore wind structural component, providing a flexible and reliable support to decision-making and balancing inspection, repair and failure costs. The procedure to create a “Point-Based” Partially...

  7. The ASME research task force on risk-based in-service inspection

    International Nuclear Information System (INIS)

    Balkey, K.R.; Chapman, O.J.V.

    1997-01-01

    The use of risk-based methods in the development of in-service inspection (ISI) and in-service testing (IST) programs for nuclear power plant and other industrial applications has been studied for the last several years through the American Society of Mechanical Engineers Centre for Research and Technology Development (ASME 1991, 1992, 1994, 1996). The results of this work are being used as a foundation to develop specific requirements for implementation of risk-based technology in ASME Codes and Standards, regulatory requirements and industry programs both in the U.S. and other countries. This paper provides a brief overview of the ASME Research Methodology and how it has been adapted for application to the inspection of piping within the USA. It also relates how the reliability of nondestructive examination (NDE) methods for pressure boundary components can impact the risk and discusses the relationship between this and NDE qualification/demonstration now being implemented in Europe and the USA. (orig.)

  8. Auxiliary feedwater system risk-based inspection guide for the North Anna nuclear power plants

    International Nuclear Information System (INIS)

    Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1992-10-01

    In a study sponsored by the US Nuclear regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. North Anna was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the North Anna plant

  9. Auxiliary feedwater system risk-based inspection guide for the Palo Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Sloan, J.A.

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Palo Verde was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Palo Verde plants

  10. Auxiliary feedwater system risk-based inspection guide for the McGuire nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Lloyd, R.C.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1994-05-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. McGuire was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the McGuire plant

  11. Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1993-12-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant

  12. Auxiliary feedwater system risk-based inspection guide for the Maine Yankee Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gore, B.F.; Vo, T.V.; Moffitt, N.E.; Bumgardner, J.D.

    1992-10-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. The information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Maine Yankee was selected as one of a series of plants for study. ne product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Maine Yankee plant

  13. Corrosion Assessment by Using Risk-Based Inspection Method for Petrochemical Plant - Practical Experience

    International Nuclear Information System (INIS)

    Choi, Song Chun; Song, Ki Hun

    2009-01-01

    Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipment of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the KGS-RBI TM program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes

  14. Auxiliary feedwater system risk-based inspection guide for the Byron and Braidwood nuclear power plants

    International Nuclear Information System (INIS)

    Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1991-07-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Byron and Braidwood were selected for the fourth study in this program. The produce of this effort is a prioritized listing of AFW failures which have occurred at the plants and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Byron/Braidwood plants. 23 refs., 1 fig., 1 tab

  15. Auxiliary feedwater system risk-based inspection guide for the H. B. Robinson nuclear power plant

    International Nuclear Information System (INIS)

    Moffitt, N.E.; Lloyd, R.C.; Gore, B.F.; Vo, T.V.; Garner, L.W.

    1993-08-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. H. B. Robinson was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the H. B. Robinson plant

  16. Auxiliary feedwater system risk-based inspection guide for the Point Beach nuclear power plant

    International Nuclear Information System (INIS)

    Lloyd, R.C.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Vehec, T.A.

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Point Beach was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRS. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Point Beach plant

  17. Auxiliary feedwater system risk-based inspection guide for the Ginna Nuclear Power Plant

    International Nuclear Information System (INIS)

    Pugh, R.; Gore, B.F.; Vo, T.V.; Moffitt, N.E.

    1991-09-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Ginna was selected as the eighth plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Ginna plant. 23 refs., 1 fig., 1 tab

  18. Risk Based Inspection Methodology and Software Applied to Atmospheric Storage Tanks

    Science.gov (United States)

    Topalis, P.; Korneliussen, G.; Hermanrud, J.; Steo, Y.

    2012-05-01

    A new risk-based inspection (RBI) methodology and software is presented in this paper. The objective of this work is to allow management of the inspections of atmospheric storage tanks in the most efficient way, while, at the same time, accident risks are minimized. The software has been built on the new risk framework architecture, a generic platform facilitating efficient and integrated development of software applications using risk models. The framework includes a library of risk models and the user interface is automatically produced on the basis of editable schemas. This risk-framework-based RBI tool has been applied in the context of RBI for above-ground atmospheric storage tanks (AST) but it has been designed with the objective of being generic enough to allow extension to the process plants in general. This RBI methodology is an evolution of an approach and mathematical models developed for Det Norske Veritas (DNV) and the American Petroleum Institute (API). The methodology assesses damage mechanism potential, degradation rates, probability of failure (PoF), consequence of failure (CoF) in terms of environmental damage and financial loss, risk and inspection intervals and techniques. The scope includes assessment of the tank floor for soil-side external corrosion and product-side internal corrosion and the tank shell courses for atmospheric corrosion and internal thinning. It also includes preliminary assessment for brittle fracture and cracking. The data are structured according to an asset hierarchy including Plant, Production Unit, Process Unit, Tag, Part and Inspection levels and the data are inherited / defaulted seamlessly from a higher hierarchy level to a lower level. The user interface includes synchronized hierarchy tree browsing, dynamic editor and grid-view editing and active reports with drill-in capability.

  19. NDT method in determining the rate of corrosion applicable to risk based inspection

    International Nuclear Information System (INIS)

    Mohamed Hairul Hasmoni; Mohamad Pauzi Ismail; Ab Razak Hamzah

    2004-01-01

    Corrosion is a major problem in oil and gas industries, refineries and chemical process plants as the equipment is often exposed to corrosive environments or elevated temperature. Important equipment need to operate safely and reliably to avoid injuries to personnel and the public, and to prevent loss time and cost incurred due to loss of production and shutdown. The paper assess the approach in evaluating the technique of non-destructive testing (NDT) using Ultrasonic Testing (UT) in determining the rate of corrosion and remaining life of equipment applicable to Risk Based Inspection (RBI). Methods in determining the corrosion rate are presented using analytical method. Examples and data from MINT chiller water pipeline are presented to illustrate the application of these methods. (Author)

  20. High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station

    International Nuclear Information System (INIS)

    Wong, S.; DiBiasio, A.; Gunther, W.

    1993-09-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant

  1. High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Wong, S.; DiBiasio, A.; Gunther, W. [Brookhaven National Lab., Upton, NY (United States)

    1993-09-01

    The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant.

  2. Evaluation of piping reliability and failure data for use in risk-based inspections of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcelos, V. de; Soares, W.A.; Costa, A.C.L. da; Rabello, E.G.; Marques, R.O., E-mail: vasconv@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2016-07-01

    During operation of industrial facilities, components and systems can deteriorate over time, thus increasing the possibility of accidents. Risk-Based Inspection (RBI) involves inspection planning based on information about risks, through assessing of probability and consequence of failures. In-service inspections are used in nuclear power plants, in order to ensure reliable and safe operation. Traditional deterministic inspection approaches investigate generic degradation mechanisms on all systems. However, operating experience indicates that degradation occurs where there are favorable conditions for developing a specific mechanism. Inspections should be prioritized at these places. Risk-Informed In-service Inspections (RI-ISI) are types of RBI that use Probabilistic Safety Assessment results, increasing reliability and plant safety, and reducing radiation exposure. These assessments use both available generic reliability and failure data, as well as plant specific information. This paper proposes a method for evaluating piping reliability and failure data important for RI-ISI programs, as well as the techniques involved. (author)

  3. Evaluation of piping reliability and failure data for use in risk-based inspections of nuclear power plants

    International Nuclear Information System (INIS)

    Vasconcelos, V. de; Soares, W.A.; Costa, A.C.L. da; Rabello, E.G.; Marques, R.O.

    2016-01-01

    During operation of industrial facilities, components and systems can deteriorate over time, thus increasing the possibility of accidents. Risk-Based Inspection (RBI) involves inspection planning based on information about risks, through assessing of probability and consequence of failures. In-service inspections are used in nuclear power plants, in order to ensure reliable and safe operation. Traditional deterministic inspection approaches investigate generic degradation mechanisms on all systems. However, operating experience indicates that degradation occurs where there are favorable conditions for developing a specific mechanism. Inspections should be prioritized at these places. Risk-Informed In-service Inspections (RI-ISI) are types of RBI that use Probabilistic Safety Assessment results, increasing reliability and plant safety, and reducing radiation exposure. These assessments use both available generic reliability and failure data, as well as plant specific information. This paper proposes a method for evaluating piping reliability and failure data important for RI-ISI programs, as well as the techniques involved. (author)

  4. Optimal, Generic Planning of Maintenance and Inspection of Steel Bridges

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Faber, Michael Havbro

    2002-01-01

    Fatigue damage is an important deterioration mechanism for steel bridges. This paper describes a simplified and generic approach for reliability and risk based inspection planning of fatigue sensitive structural details. Fatigue sensitive details are categorized according to their loading charact...

  5. Application of CFD dispersion calculation in risk based inspection for release of H2S

    International Nuclear Information System (INIS)

    Sharma, Pavan K.; Vinod, Gopika; Singh, R.K.; Rao, V.V.S.S.; Vaze, K.K.

    2011-01-01

    In atmospheric dispersion both deterministic and probabilistic approached have been used for addressing design and regulatory concerns. In context of deterministic calculations the amount of pollutants dispersion in the atmosphere is an important area wherein different approaches are followed in development of good analytical model. The analysis based on Computational Fluid Dynamics (CFD) codes offer an opportunity of model development based on first principles of physics and hence such models have an edge over the existing models. In context of probabilistic methods applying risk based inspection (wherein consequence of failure from each component needs to be assessed) are becoming popular. Consequence evaluation in a process plant is a crucial task. Often the number of components considered for life management will be too huge. Also consequence evaluation of all the components proved to be laborious task. The present paper is the results of joint collaborative work from deterministic and probabilistic modelling group working in the field of atmospheric dispersion. Even though API 581 has simplified qualitative approach, regulators find the some of the factors, in particular, quantity factor, not suitable for process plants. Often dispersion calculations for heavy gas are done with very simple model which can not take care of density based atmospheric dispersion. This necessitates a new approach with a CFD based technical basis is proposed, so that the range of quantity considered along with factors used can be justified. The present paper is aimed at bringing out some of the distinct merits and demerits of the CFD based models. A brief account of the applications of such CFD codes reported in literature is also presented in the paper. This paper describes the approach devised and demonstrated for the said issue with emphasis of CFD calculations. (author)

  6. Optimizing the design of international safeguards inspection systems

    International Nuclear Information System (INIS)

    Markin, J.T.; Coulter, C.A.; Gutmacher, R.G.; Whitty, W.J.

    1983-01-01

    Efficient implementation of international inspections for verifying the operation of a nuclear facility requires that available resources be allocated among inspection activities to maximize detection of misoperation. This report describes a design and evaluation method for selecting an inspection system that is optimal for accomplishing inspection objectives. The discussion includes methods for identifying system objectives, defining performance measures, and choosing between candidate systems. Optimization theory is applied in selecting the most preferred inspection design for a single nuclear facility, and an extension to optimal allocation of inspection resources among States containing multiple facilities is outlined. 3 figures, 5 tables

  7. Computational framework for risk-based planning of inspections, maintenance, and condition monitoring using discrete Bayesian networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents a computational framework for risk-based planning of inspections and repairs for deteriorating components. Two distinct types of decision rules are used to model decisions: simple decision rules that depend on constants or observed variables (e.g. inspection outcome...... expecte d life-cycle costs. For advanced decision rules, simulations are performed to estimate the expected costs, and dBNs are used within the simulations for decision-making. Information from inspections and condition monitoring are included if available. An example in the paper demonstrates...... the framework and the implemented strategies and decision rules, including various types of condition-based maintenance. The strategies using advanced decision rules lead to reduced costs compared to the simple decision rules when condition monitoring is applied, and the value of condition monitoring...

  8. An optimal inspection strategy for randomly failing equipment

    International Nuclear Information System (INIS)

    Chelbi, Anis; Ait-Kadi, Daoud

    1999-01-01

    This paper addresses the problem of generating optimal inspection strategies for randomly failing equipment where imminent failure is not obvious and can only be detected through inspection. Inspections are carried out following a condition-based procedure. The equipment is replaced if it has failed or if it shows imminent signs of failure. The latter state is indicated by measuring certain predetermined control parameters during inspection. Costs are associated with inspection, idle time and preventive or corrective actions. An optimal inspection strategy is defined as the inspection sequence minimizing the expected total cost per time unit over an infinite span. A mathematical model and a numerical algorithm are developed to generate an optimal inspection sequence. As a practical example, the model is applied to provide a machine tool operator with a time sequence for inspecting the cutting tool. The tool life time distribution and the trend of one control parameter defining its actual condition are supposed to be known

  9. A risk-based restaurant inspection system in Los Angeles County.

    Science.gov (United States)

    Buchholz, U; Run, G; Kool, J L; Fielding, J; Mascola, L

    2002-02-01

    The majority of local health departments perform routine restaurant inspections. In Los Angeles County (LAC), California, approximately $10 million/year is spent on restaurant inspections. However, data are limited as to whether or not certain characteristics of restaurants make them more likely to be associated with foodborne incident reports. We used data from the LAC Environmental Health Management Information System (EHMIS), which records the results of all routine restaurant inspections as well as data regarding all consumer-generated foodborne incidents that led to a special restaurant inspection by a sanitarian (investigated foodborne incidents [IFBIs]). We analyzed a cohort of 10,267 restaurants inspected from 1 July 1997 to 15 November 1997. We defined a "case restaurant" as any restaurant with a routine inspection from 1 July 1997 to 15 November 1997 and a subsequent IFBI from 1 July 1997 to 30 June 1998. Noncase restaurants did not have an IFBI from I July 1997 to 30 June 1998. We looked for specific characteristics of restaurants that might be associated with the restaurant subsequently having an IFBI, including the size of restaurant (assessed by number of seats), any previous IFBIs, the overall inspection score, and a set of 38 violation codes. We identified 158 case restaurants and 10,109 noncase restaurants. In univariate analysis, middle-sized restaurants (61 to 150 seats; n = 1,681) were 2.8 times (95% confidence interval [CI] = 2.0 to 4.0) and large restaurants (>150 seats; n = 621) were 4.6 times (95% CI = 3.0 to 7.0) more likely than small restaurants (restaurants. In addition, the likelihood of a restaurant becoming a case restaurant increased as the number of IFBIs in the prior year increased (chi2 for linear trend, P value = 0.0005). Other factors significantly associated with the occurrence of an IFBI included a lower overall inspection score, the incorrect storage of food, the reuse of food, the lack of employee hand washing, the lack of

  10. Application of probabilistic risk based optimization approaches in environmental restoration

    International Nuclear Information System (INIS)

    Goldammer, W.

    1995-01-01

    The paper presents a general approach to site-specific risk assessments and optimization procedures. In order to account for uncertainties in the assessment of the current situation and future developments, optimization parameters are treated as probabilistic distributions. The assessments are performed within the framework of a cost-benefit analysis. Radiation hazards and conventional risks are treated within an integrated approach. Special consideration is given to consequences of low probability events such as, earthquakes or major floods. Risks and financial costs are combined to an overall figure of detriment allowing one to distinguish between benefits of available reclamation options. The probabilistic analysis uses a Monte Carlo simulation technique. The paper demonstrates the applicability of this approach in aiding the reclamation planning using an example from the German reclamation program for uranium mining and milling sites

  11. Development and application of proposed ASME Section XI Code changes for risk-based inspection of piping

    International Nuclear Information System (INIS)

    West, R.A.

    1996-01-01

    This synopsis has been written to describe a perspective on the development and application of ASME Section XI Code changes for risk-based inspection of piping. The content is specifically related to the use of risk-based technology for Inservice Inspection (ISI) of piping and efforts made to support the ASME Research/Westinghouse Owners Group/Millstone Unit 3 approach for use of this technology. The opinions contained herein may or may not reflect those of the ASME Codes and Standards Committees responsible for these activities. In order to take such a detailed technical subject and put it into an understandable format, the author has chosen to provide an analogy to simplify what is actually taking place. Risk-based technology in the ISI of piping can be likened to the process of making and using specifically ground prescription glasses to allow for better vision. It provides a process to develop and use these uniquely ground glasses that will dynamically focus on all the locations and obstacles within a plant's piping systems that could cause that plant to trip and fall; more importantly it identifies the locations where the fall could possibly hurt someone else. In this way, Nuclear Safety is being addressed

  12. ASME development of risk-based inspection guidelines for nuclear power plants

    International Nuclear Information System (INIS)

    Gore, B.F.; Balkey, K.R.

    1992-08-01

    A methodology has been developed for use in preparing guidelines for the in-service inspection of nuclear power plant pressure boundary and structural components. This methodology is a further development of a general methodology previously published by the task force for application to any industry. It is unique in that it utilizes probabilistic risk assessment (PRA) information to improve the quantification of risks associated with component ruptures. A procedure has also been recommended for using the resulting quantified risk estimates to determine target component rupture probability values to be maintained by inspection activities. Characteristics which an inspection strategy must possess in order to maintain target rupture probabilities are being determined by structural risk and reliability analysis (SRRA) calculations. The major features of this methodology are described in this paper, and example applications are briefly discussed. Plans for additional work in developing and applying the methodology are described

  13. Status of ASME risk-based inspection guidelines development for nuclear power plants

    International Nuclear Information System (INIS)

    Gore, B.F.; Vo, T.V.; Balkey, K.R.

    1991-01-01

    The general methodology published by the task force is being applied to develop guidelines for the inspection of nuclear power plant components. The methodology has been expanded to include the use of information from probabilistic risk assessments to improve the quantification of risks associated with component ruptures. In addition, a procedure has been recommended for using these quantified risk estimates to determine target component rupture probability values to be maintained by inspection activities. Finally, the method for determining the characteristics which an inspection strategy must possess in order to maintain these target rupture probabilities has been described. This paper presents the major features of this methodology, along with a discussion of the status of efforts to develop and to apply it further

  14. Epidemiologic and economic evaluation of risk-based meat inspection for bovine cysticercosis in Danish cattle

    DEFF Research Database (Denmark)

    Calvo Artavia, Francisco Fernando; Nielsen, Liza Rosenbaum; Alban, L.

    2013-01-01

    line. The exact total NEE for the cattle sector depends on how many and which of the abattoirs that would be able to reorganise the work at the slaughter line to save money on inspection of the head of carcases. Overall, the SSSe was low in all scenarios leading to undetected BC-positive cattle both...

  15. Application of risk based inspection methodology of API 581 BRD to oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pezzi Filho, M. [Petrobras, Rio de Janeiro (Brazil); Freire, J.L.F.; Maragone, F.. [Pontifica Univ. Catolica, Rio de Janeiro (Brazil)

    2004-07-01

    In response to public concerns regarding the safe operation of pipelines, operators are relying on risk management to balance the demands of pipeline integrity and service competitiveness. This paper presented a procedure for calculating the probability of failure according to the API 581 BRD RB I methodology that uses data collected from 3 existing oil pipelines subject to internal corrosion. The risk exposure that the pipeline may be subjected to during its remaining operating life was evaluated. Risk is a function of the probability of failure and the consequences of that failure. Therefore, if the consequences of the failure are assumed to remain unchanged for a given equipment under specific operational conditions, then risk reduction will only be achieved by decreasing the probability of failure and through management of the inspection process. It was shown that if the confidence on the damage rate and on the inspection effectiveness is known, then it is possible to design an alternative to an existing inspection plan. This calls for pig inspections at 5 year intervals to ensure that the probability of failures for pipelines will be under a certain level of tolerable risk. 9 refs., 4 tabs., 3 figs.

  16. Feasibility of developing risk-based rankings of pressure boundary systems for inservice inspection

    Energy Technology Data Exchange (ETDEWEB)

    Vo, T.V.; Smith, B.W.; Simonen, F.A.; Gore, B.F.

    1994-08-01

    The goals of the Evaluation and Improvement of Non-destructive Examination Reliability for the In-service Inspection of Light Water Reactors Program sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory (PNL) are to (1) assess current ISI techniques and requirements for all pressure boundary systems and components, (2) determine if improvements to the requirements are needed, and (3) if necessary, develop recommendations for revising the applicable ASME Codes and regulatory requirements. In evaluating approaches that could be used to provide a technical basis for improved inservice inspection plans, PNL has developed and applied a method that uses results of probabilistic risk assessment (PRA) to establish piping system ISI requirements. In the PNL program, the feasibility of generic ISI requirements is being addressed in two phases. Phase I involves identifying and prioritizing the systems most relevant to plant safety. The results of these evaluations will be later consolidated into requirements for comprehensive inservice inspection of nuclear power plant components that will be developed in Phase II. This report presents Phase I evaluations for eight selected plants and attempts to compare these PRA-based inspection priorities with current ASME Section XI requirements for Class 1, 2 and 3 systems. These results show that there are generic insights that can be extrapolated from the selected plants to specific classes of light water reactors.

  17. Feasibility of developing risk-based rankings of pressure boundary systems for inservice inspection

    International Nuclear Information System (INIS)

    Vo, T.V.; Smith, B.W.; Simonen, F.A.; Gore, B.F.

    1994-08-01

    The goals of the Evaluation and Improvement of Non-destructive Examination Reliability for the In-service Inspection of Light Water Reactors Program sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory (PNL) are to (1) assess current ISI techniques and requirements for all pressure boundary systems and components, (2) determine if improvements to the requirements are needed, and (3) if necessary, develop recommendations for revising the applicable ASME Codes and regulatory requirements. In evaluating approaches that could be used to provide a technical basis for improved inservice inspection plans, PNL has developed and applied a method that uses results of probabilistic risk assessment (PRA) to establish piping system ISI requirements. In the PNL program, the feasibility of generic ISI requirements is being addressed in two phases. Phase I involves identifying and prioritizing the systems most relevant to plant safety. The results of these evaluations will be later consolidated into requirements for comprehensive inservice inspection of nuclear power plant components that will be developed in Phase II. This report presents Phase I evaluations for eight selected plants and attempts to compare these PRA-based inspection priorities with current ASME Section XI requirements for Class 1, 2 and 3 systems. These results show that there are generic insights that can be extrapolated from the selected plants to specific classes of light water reactors

  18. Inspection qualification as a tool to risk based ET ISI of VVER type SG tubes

    International Nuclear Information System (INIS)

    Horacek, L.

    2002-01-01

    A Pilot study on Eddy current inspection qualification of VVER 440 steam generator tubes, discussed in this paper, followed the ENIQ methodology principles and covered briefly the assumed scope of ET qualification, relevant elaborated qualification documents, known ISI limitations and a review of input information on component and defects determined for Eddy current inspection qualification of VVER 440 steam generator tubes. The information includes the fabrication of the test blocks with SG tube segments provided by intended defect simulations of realistic SCC type and basic data on the realistic SCC type defects manufacturing technology. Lessons learned from the development of manufacturing technology of SSC type of defects, regional blind tests, elaboration of the preliminary technical justification for Eddy current automated inspections, potential optimisation of inspection procedures, laboratory and practical open trials are summarised in the paper. The results of the Pilot study also especially in relation to POD curve being determined seem to be useful for practical operational ISI programme and Risk informed ISI decisions and the establishment of plugging criteria of VVER 440 and VVER 1000 type steam generator tubes. (orig.)

  19. The broken food chain information: cross border issues of risk-based meat inspection in the pig sector in Germany and the Netherlands

    NARCIS (Netherlands)

    Wilke, T.; Wagenberg, van C.P.A.; Oosterkamp, E.B.; Bondt, N.; Lang, J.

    2012-01-01

    European food safety legislation allows for a new type of meat inspection in swine. This ‘risk-based meat inspection without incision’ or ‘supply chain meat inspection’ (SCMI) uses food chain information to derive a veterinary prognosis on the pigs’ health prior to delivery to the slaughterhouse and

  20. Probabilistic safety analysis and risk-based inspection of nuclear research reactors: state-of-the-art and implementation proposal

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Raíssa O.; Vasceoncelos, Vanderley de; Soares, Wellington A.; Silva Júnior, Silvério F.; Raso, Amanda L.; Mesquita, Amir Z., E-mail: raissaomarques@gmail.com, E-mail: vasconv@cdtn.br, E-mail: soaresw@cdtn.br, E-mail: silvasf@cdtn.br, E-mail: amandaraso@hotmail.com, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    Industrial facilities systems deteriorate over time during operation, thus increasing the possibility of accidents. Risk-Based Inspection (RBI) classifies such systems by their risk information with the purpose of prioritizing inspection efforts. RBI can reduce inspection activities, resulting in lower risk levels, and maintaining reliability and safety in acceptable levels. Risk-Informed In-Service Inspection (RI-ISI) is a RBI approach used in nuclear industry. RI-ISI uses outcomes from Probabilistic Safety Analysis (PSA) of Nuclear Power Plants (NPP) to plan In-Service Inspections (ISI). Despite nuclear research reactors are simpler and have lower risks than power reactors, the application of PSA to them may be useful for safety improvements once they are more flexible, provide easier access to its core, and allow changes in fuel configurations in case of experimental tests. Ageing management of structures, systems and components important to safety of a nuclear research reactor throughout its lifetime is also required to assure continued adequacy of safety levels, reliable operation, and compliance with operational limits and conditions. This includes periodic review of ISI programs in which monitoring of material deterioration and aging effects are considered, and that can be supported by the RBI approach. A review of state-of-the-art of PSA and RBI applications to nuclear reactors is presented in this work. Advantages to apply these methodologies are also analyzed. PSA and RBI implementation proposal applied to nuclear research reactors is also presented, as well as its application to a TRIGA research nuclear reactor using computer codes developed by ReliaSoft® Corporation. (author)

  1. Probabilistic safety analysis and risk-based inspection of nuclear research reactors: state-of-the-art and implementation proposal

    International Nuclear Information System (INIS)

    Marques, Raíssa O.; Vasceoncelos, Vanderley de; Soares, Wellington A.; Silva Júnior, Silvério F.; Raso, Amanda L.; Mesquita, Amir Z.

    2017-01-01

    Industrial facilities systems deteriorate over time during operation, thus increasing the possibility of accidents. Risk-Based Inspection (RBI) classifies such systems by their risk information with the purpose of prioritizing inspection efforts. RBI can reduce inspection activities, resulting in lower risk levels, and maintaining reliability and safety in acceptable levels. Risk-Informed In-Service Inspection (RI-ISI) is a RBI approach used in nuclear industry. RI-ISI uses outcomes from Probabilistic Safety Analysis (PSA) of Nuclear Power Plants (NPP) to plan In-Service Inspections (ISI). Despite nuclear research reactors are simpler and have lower risks than power reactors, the application of PSA to them may be useful for safety improvements once they are more flexible, provide easier access to its core, and allow changes in fuel configurations in case of experimental tests. Ageing management of structures, systems and components important to safety of a nuclear research reactor throughout its lifetime is also required to assure continued adequacy of safety levels, reliable operation, and compliance with operational limits and conditions. This includes periodic review of ISI programs in which monitoring of material deterioration and aging effects are considered, and that can be supported by the RBI approach. A review of state-of-the-art of PSA and RBI applications to nuclear reactors is presented in this work. Advantages to apply these methodologies are also analyzed. PSA and RBI implementation proposal applied to nuclear research reactors is also presented, as well as its application to a TRIGA research nuclear reactor using computer codes developed by ReliaSoft® Corporation. (author)

  2. Optimal allocation of International Atomic Energy Agency inspection resources

    International Nuclear Information System (INIS)

    Markin, J.T.

    1987-12-01

    The Safeguards Department of the International Atomic Energy Agency (IAEA) conducts inspections to assure the peaceful use of a state's nuclear materials and facilities. Because of limited resources for conducting inspections, the careful disposition of inspection effort among these facilities is essential if the IAEA is to attain its safeguards goals. This report describes an optimization procedure for assigning an inspection effort to maximize attainment of IAEA goals. The procedure does not require quantitative estimates of safeguards effectiveness, material value, or facility importance. Instead, the optimization is based on qualitative, relative prioritizations of inspection activities and materials to be safeguarded. This allocation framework is applicable to an arbitrary group of facilities such as a state's fuel cycle, the facilities inspected by an operations division, or all of the facilities inspected by the IAEA

  3. Calculation of frequency of optimal inspection in non-notice inspection game

    International Nuclear Information System (INIS)

    Kumakura, Shinichi; Gotoh, Yoshiki; Kikuchi, Masahiro

    2011-01-01

    We consider a non-notice inspection game between an inspection party, who verifies absence of diversion of nuclear materials and misuse of nuclear facility, and a facility operator, who tries them in a nuclear facility. In the game, the payoff for each player, inspection party and facility operator, is composed of various elements (parameters) such as facility type, a type of nuclear material, number of inspection and others. Their payoffs consist of profits and costs (minus profit). Because of random nature by non-notice inspection, its deterrence effect and inspection number could have the potential to affect their payoffs. In this paper, their payoffs taking into consideration of the inspection environment above are represented as a function of inspection number. Then, the optimal number is calculated from a condition on their payoffs for number of inspection. Comparable statics analysis is performed in order to observe the change of inspection number which is equilibrium point by changing these parameters including deterrence effect, because the number derived depends on each parameter within the inspection environment. Based on the analysis results, necessary conditions to reduce the inspection number keeping inspection effect are pointed out. (author)

  4. Auxiliary feedwater system risk-based inspection guide for the Beaver Valley, Units 1 and 2 nuclear power plants

    International Nuclear Information System (INIS)

    Lloyd, R.C.; Vehec, T.A.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Rossbach, L.W.; Sena, P.P. III

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Beaver Valley Units 1 and 2 were selected as two of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at Beaver Valley Units 1 and 2

  5. Auxiliary feedwater system risk-based inspection guide for the J.M. Farley Nuclear Power Plant

    International Nuclear Information System (INIS)

    Vo, T.V.; Pugh, R.; Gore, B.F.; Harrison, D.G.

    1990-10-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment(PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. J. M. Farley was selected as the second plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important at the J. M. Farley plant. 23 refs., 1 fig., 1 tab

  6. High Pressure Coolant Injection (HPCI) system risk-based inspection guide: Pilgrim Nuclear Power Station

    International Nuclear Information System (INIS)

    Shier, W.; Gunther, W.

    1992-10-01

    A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Pilgrim Nuclear Power Station is described in this report. The information for this review was obtained from Pilgrim Licensee Event Reports (LERs) that were generated between 1980 and 1989. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Pilgrim operating experience review have been compared with the results of of a similar, industry wide operating experience review. this comparison provides an indication of areas in the Pilgrim HPCI system that should be given increased attention in the prioritization of inspection resources

  7. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  8. High Pressure Coolant Injection system risk-based inspection guide for Hatch Nuclear Power Station

    International Nuclear Information System (INIS)

    DiBiasio, A.M.

    1993-05-01

    A review of the operating experience for the High Pressure Coolant Injection (HPCI) system at the Hatch Nuclear Power Station, Units 1 and 2, is described in this report. The information for this review was obtained from Hatch Licensee Event Reports (LERs) that were generated between 1980 and 1992. These LERs have been categorized into 23 failure modes that have been prioritized based on probabilistic risk assessment considerations. In addition, the results of the Hatch operating experience review have been compared with the results of a similar, industry wide operating, experience review. This comparison provides an indication of areas in the Hatch HPCI system that should be given increased attention in the prioritization of inspection resources

  9. Optimal Inspection and Maintenance Strategies for Structural Systems

    DEFF Research Database (Denmark)

    Sommer, A. M.

    The aim of this thesis is to give an overview of conventional and optimal reliability-based inspection and maintenance strategies and to examine for specific structures how the cost can be reduced and/or the safety can be improved by using optimal reliability-based inspection strategies....... For structures with several almost similar components it is suggested that individual inspection strategies should be determined for each component or a group of components based on the reliability of the actual component. The benefit of this procedure is assessed in connection with the structures considered....... Furthermore, in relation to the calculations performed the intention is to modify an existing program for determination of optimal inspection strategies. The main purpose of inspection and maintenance of structural systems is to prevent or delay damage or deterioration to protect people, environment...

  10. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  11. Optimizing pre-service inspection data

    International Nuclear Information System (INIS)

    Mullins, L.E.; Harrison, J.M.

    1986-01-01

    The phenomenon of intergranular stress corrosion cracking (IGSCC) in nuclear power plant piping systems has been the single biggest factor in an evolution that has changed and continues to change in-service inspection practices and philosophy throughout the industry. In-service inspection has been found to deal with several distinct phases of the problem. At the onset, existing technology was demonstrated to be unable to detect IGSCC adequately. This inability to detect IGSCC was soon overcome. However, it immediately pointed out the difficulties associated with the discrimination between IGSCC and other harmless metallurgical conditions. On the heels of detection and discrimination came problems associated with determining crack size and the monitoring of overlayed flaws. A wealth of information has been written on all phases of IGSCC; however, one particular aspect has as of yet seen little attention. With an increasing number of plants choosing to replace flawed pipe, the pre-service inspection of the replaced piping demands increased attention. The lessons learned through inspection for IGSCC need again to be applied to the replacement piping. Through increased attention at installation, many of the difficulties associated with proper inservice inspection may be reduced or eliminated, thereby realizing an economy in outage scheduling, personnel exposure, and, overall, a more reliable in-service examination

  12. Optimal inspection planning for onshore pipelines subject to external corrosion

    International Nuclear Information System (INIS)

    Gomes, Wellison J.S.; Beck, André T.; Haukaas, Terje

    2013-01-01

    Continuous operation of pipeline systems involves significant expenditures in inspection and maintenance activities. The cost-effective safety management of such systems involves allocating the optimal amount of resources to inspection and maintenance activities, in order to control risks (expected costs of failure). In this context, this article addresses the optimal inspection planning for onshore pipelines subject to external corrosion. The investigation addresses a challenging problem of practical relevance, and strives for using the best available models to describe random corrosion growth and the relevant limit state functions. A single pipeline segment is considered in this paper. Expected numbers of failures and repairs are evaluated by Monte Carlo sampling, and a novel procedure is employed to evaluate sensitivities of the objective function with respect to design parameters. This procedure is shown to be accurate and more efficient than finite differences. The optimum inspection interval is found for an example problem, and the robustness of this optimum to the assumed inspection and failure costs is investigated. It is shown that optimum total expected costs found herein are not highly sensitive to the assumed costs of inspection and failure. -- Highlights: • Inspection, repair and failure costs of pipeline systems considered. • Optimum inspection schedule (OIS) obtained by minimizing total expected life-cycle costs. • Robustness of OIS evaluated w.r.t. estimated costs of inspection and failure. • Accurate non-conservative models of corrosion growth employed

  13. Optimal inspection strategies for offshore structural systems

    DEFF Research Database (Denmark)

    Faber, M. H.; Sorensen, J. D.; Kroon, I. B.

    1992-01-01

    a mathematical framework for the estimation of the failure and repair costs a.ssociated with systems failure. Further a strategy for selecting the components to inspect based on decision tree analysis is suggested. Methods and analysis schemes are illustrated by a simple example....

  14. Analisis Remaining Life dan Penjadwalan Program Inspeksi pada Pressure Vessel dengan Menggunakan Metode Risk Based Inspection (RBI

    Directory of Open Access Journals (Sweden)

    Dyah Arina Wahyu Lillah

    2017-01-01

    Full Text Available Seiring perkembangan eksplorasi minyak dan gas bumi di dunia, perusahaan minyak dan gas di Indonesia juga turut berlomba-lomba untuk mendapatkan ladang minyak dan gas bumi sebanyak-banyaknya. Perkembangan ini turut dipengaruhi oleh aturan-aturan pemerintah mengenai keselamatan dan pencegahan bahaya baik pada unit yang dikelola maupun tenaga kerja pengelola. Untuk itu semua perlatan-peralatan (unit kerja harus dijamin kehandalaannya agar tidak menimbulkan bahaya baik bagi pekerja maupun lingkungan. Subjek penelitian dalam tugas akhir ini ialah pada pressure vessel yang dimiliki oleh Terminal LPG Semarang. Kemungkinan bahaya yang dapat menyebabkan kerusakan pada pressure vessel perlu dianalisis agar dapat meminimalkan resiko yang akan terjadi. Metode Risk Based Inspection (RBI diharapkan dapat meminimalkan resiko yang ada pada pressure vessel. Penilaian resiko dalam tugas akhir ini mengacu pada standar API RP 581. Untuk mengetahui besarnya resiko yang ada pada plant, maka terlebih dahulu harus dihitung besarnya probabilitas kegagalan dan konsekuensi apabila terjadi kegagalan. Langkah selanjutnya ialah membandingkan besarnya resiko yang didapat dengan target resiko yang dimiliki oleh perusahaan. Dari hasil perbandingan ini dapat diketahui tingkat resiko pressure vessel, sehingga dapat ditentukan jadwal inspeksi dan metode inspeksi yang tepat.

  15. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  16. Optimizing and joining future safeguards efforts by 'remote inspections'

    International Nuclear Information System (INIS)

    Zendel, M.; Khlebnikov, N.

    2009-01-01

    Full-text: Remote inspections have a large potential to save inspection effort in future routine safeguards implementation. Such inspections involve remote activities based on the analysis of data acquired in the field without the physical presence of an inspector, shifting the inspectors' priorities further toward unannounced inspections, complementary access activities and data evaluation. Large, automated and complex facilities require facility resident and specific safeguards equipment systems with features for unattended and remotely controlled operation as well as being integrated in the nuclear process. In many instances the use of such equipment jointly with the SSAC/RSAC and the operator is foreseen to achieve affordable effectiveness with a minimum level of intrusiveness to the facility operation. Where it becomes possible to achieve independent conclusions by this approach, the IAEA would make full use of the SSAC/RSAC, involving State inspectors and/or facility operators to operate inspection systems under remotely controlled IAEA mechanisms. These mechanisms would include documented procedures for routine joint-use, defining arrangements for data sharing, physical security and authentication mechanisms, recalibration and use of standards and software, maintenance, repair, storage and transportation. The level of cooperation and willingness of a State to implement such measures requested and properly justified by the IAEA will demonstrate its commitment to full transparency in its nuclear activities. Examples of existing remote inspection activities, including joint-use activities will be discussed. The future potential of remote inspections will be assessed considering technical developments and increased needs for process monitoring. Enhanced cooperation with SSAC/RSAC within the framework of remote inspections could further optimize the IAEA's inspection efforts while at the same time maintaining effective safeguards implementation. (author)

  17. Optimization on replacement and inspection period of plant equipment

    International Nuclear Information System (INIS)

    Takase, Kentaro; Kasai, Masao

    2004-01-01

    Rationalization of the plant maintenance is one of the main topics being investigated in Japanese nuclear power industries. Optimization of the inspection and replacement period of equipments is effective for the maintenance cost reduction. The more realistic model of the replacement policy is proposed in this study. It is based on the classical replacement policy model and its cost is estimated. Then, to consider the inspection for the maintenance, the formulation that includes the risk concept is discussed. Based on it, two variations of the combination of the inspection and the replacement are discussed and the costs are estimated. In this study the effect of the degradation of the equipment is important. The optimized maintenance policy depends on the existence of significant degradation. (author)

  18. Parallel optimization algorithm for drone inspection in the building industry

    Science.gov (United States)

    Walczyński, Maciej; BoŻejko, Wojciech; Skorupka, Dariusz

    2017-07-01

    In this paper we present an approach for Vehicle Routing Problem with Drones (VRPD) in case of building inspection from the air. In autonomic inspection process there is a need to determine of the optimal route for inspection drone. This is especially important issue because of the very limited flight time of modern multicopters. The method of determining solutions for Traveling Salesman Problem(TSP), described in this paper bases on Parallel Evolutionary Algorithm (ParEA)with cooperative and independent approach for communication between threads. This method described first by Bożejko and Wodecki [1] bases on the observation that if exists some number of elements on certain positions in a number of permutations which are local minima, then those elements will be in the same position in the optimal solution for TSP problem. Numerical experiments were made on BEM computational cluster with using MPI library.

  19. Optimal Inspection Planning for Fatigue Damage of Offshore Structures

    DEFF Research Database (Denmark)

    Madsen, H.O.; Sørensen, John Dalsgaard; Olesen, R.

    1990-01-01

    A formulation of optimal design, inspection and maintenance against damage caused by fatigue crack growth is formulated. A stochastic model for fatigue crack growth based on linear elastic fracture mechanics Is applied. Failure is defined by crack growth beyond a critical crack size. The failure ...

  20. Optimization of inspection and replacement period by using Bayesian statistics

    International Nuclear Information System (INIS)

    Kasai, Masao; Watanabe, Yasushi; Kusakari, Yoshiyuki; Notoya, Junichi

    2006-01-01

    This study describes the formulations to optimize the time interval of inspections and/or replacements of equipment/parts taking into account the probability density functions (PDF) for failure rates and parameters of failure distribution functions (FDF) and evaluates the optimized results of these time intervals using our formulations by comparing with those using only representative values of failure rates and the parameters of FDF instead of using these PDFs. The PDFs are obtained with Bayesian method and the representative values are obtained with likelihood estimation method. However, any significant difference is not observed between both optimized results within our preliminary calculations. (author)

  1. Rational risk-based decision support for drinking water well managers by optimized monitoring designs

    Science.gov (United States)

    Enzenhöfer, R.; Geiges, A.; Nowak, W.

    2011-12-01

    Advection-based well-head protection zones are commonly used to manage the contamination risk of drinking water wells. Considering the insufficient knowledge about hazards and transport properties within the catchment, current Water Safety Plans recommend that catchment managers and stakeholders know, control and monitor all possible hazards within the catchments and perform rational risk-based decisions. Our goal is to supply catchment managers with the required probabilistic risk information, and to generate tools that allow for optimal and rational allocation of resources between improved monitoring versus extended safety margins and risk mitigation measures. To support risk managers with the indispensable information, we address the epistemic uncertainty of advective-dispersive solute transport and well vulnerability (Enzenhoefer et al., 2011) within a stochastic simulation framework. Our framework can separate between uncertainty of contaminant location and actual dilution of peak concentrations by resolving heterogeneity with high-resolution Monte-Carlo simulation. To keep computational costs low, we solve the reverse temporal moment transport equation. Only in post-processing, we recover the time-dependent solute breakthrough curves and the deduced well vulnerability criteria from temporal moments by non-linear optimization. Our first step towards optimal risk management is optimal positioning of sampling locations and optimal choice of data types to reduce best the epistemic prediction uncertainty for well-head delineation, using the cross-bred Likelihood Uncertainty Estimator (CLUE, Leube et al., 2011) for optimal sampling design. Better monitoring leads to more reliable and realistic protection zones and thus helps catchment managers to better justify smaller, yet conservative safety margins. In order to allow an optimal choice in sampling strategies, we compare the trade-off in monitoring versus the delineation costs by accounting for ill

  2. Optimal Inspection and Repair Strategies for Structural Systems

    DEFF Research Database (Denmark)

    Sommer, A. M.; Nowak, A. S.; Thoft-Christensen, Palle

    1992-01-01

    and a design variable as optimization variables. A model for estimating the total expected costs for structural systems is given including the costs associated with the loss of individual structural members as well as the costs associated with the loss of at least one element of a particular group......A model for reliability-based repair and maintenance strategies of structural systems is described. The total expected costs in the lifetime of the structure are minimized with the number of inspections, the number and positions of the inspected points, the inspection efforts, the repair criteria...... of structural members and the costs associated with the simultaneous loss of all members of a specific group of structural members. The approach is based on the pre-posteriori analysis from the classical decision theory. Special emphasis is given to the problem of selecting the number of points in the structure...

  3. RBI - Risk Based Inspection: new technologies and methods applied to inspections of FPSO (Floating Production, Storage and Offloading Vessel) hull; IBR - Inspecao Baseada em Risco: novas tecnologias e metodos aplicados as inspecoes de casco de FPSOs

    Energy Technology Data Exchange (ETDEWEB)

    Farias, Bruno de; Figueiredo, Eduardo; Luiz, Marcio [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Meurer, Gustavo; Duarte, Romulo; Oliveira, Thais; Krzonkalla, Viviane [ABS Consulting, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    With the aging of the FPSO's, which are fundamental to the operation Offshore, better techniques and technologies must be applied to assess more accurately the actual efficiency and structural conditions of producing unit. With the emergence of new engineering techniques and equipment and methods of structural inspection, is now possible to use these new technologies to better manage risk and reliability of the structure of the FPSO, with that, the inspections and methods are more rational and efficient. The Risk-Based Inspection is the tool for monitoring operation of industrial plants with systemic use of technology in conjunction with risk analysis and reliability. His concept is applicable to various branches of industry. The companies began their implementation of oil by refineries. The group of ABS Consulting with PETROBRAS has been developing and implementing these new technologies in inspections of hulls of FPSO's. Applied successfully in the units of the Campos basin, these methods are used by the group of Risk-Based Inspection to improve the efficiency of all the steps involved with the structural integrity of the unit. (author)

  4. Optimized inspection techniques and structural analysis in lifetime management

    International Nuclear Information System (INIS)

    Aguado, M.T.; Marcelles, I.

    1993-01-01

    Preservation of the option of extending the service lifetime of a nuclear power plant beyond its normal design lifetime requires correct remaining lifetime management from the very beginning of plant operation. The methodology used in plant remaining lifetime management is essentially based on the use of standard inspections, surveillance and monitoring programs and calculations, such as thermal-stress and fracture mechanics analysis. The inspection techniques should be continuously optimized, in order to be able to detect and dimension existing defects with the highest possible degree of accuracy. The information obtained during the inspection is combined with the historical data of the components: design, quality, operation, maintenance, and transients, and with the results of destructive testing, fracture mechanics and thermal fatigue analysis. These data are used to estimate the remaining lifetime of nuclear power plant components, systems and structures with the highest degree possible of accuracy. The use of this methodology allows component repairs and replacements to be reduced or avoided and increases the safety levels and availability of the nuclear power plant. Use of this strategy avoids the need for heavy investments at the end of the licensing period

  5. Aspects of the Optimization on the In-Service Inspection

    International Nuclear Information System (INIS)

    Korosec, D.; Vojvodic Tuma, J.

    2002-01-01

    In the present paper, the aspects of optimizing In-Service Inspection (ISI) is discussed. Slovenian Nuclear Safety Administration (SNSA) and its authorized organization for the ISI activities, Institute of Metals and Technologies, are actually permanently involved in the ISI processes of the nuclear power plant (NPP) Krsko. Based on the previous experience on the ISI activities, evaluation of the results and review of the new ISI program, the decision was made to improve recent regulatory and professional practice. That means, the conclusion was made to optimize the evaluation process of the ISI as a process. Traditional criteria, standards and practice gives good fundament for the improvements implementation. Improvements can be done on the way that the more broad knowledge about safety important components of the systems shall bee added to the basic practice. It is necessary to identify conditions of the safety important components, such as realistic stress and fatigue conditions, material properties changes due aging processes, the temperature cycling effects, existing flaws characterization in the light of the previous detection and equipment technique used, assessment of the measurement accuracy on the results etc. In addition to the above mentioned, risk assessment and evaluation of the whole ISI shall be done. To do this it is necessary to made risk evaluation, based on previous structural element probability assessment. Probabilistic risk assessment is important and one of the most powerful tools in the ISI optimization. Some basic work on the filed of the risk informed methods related to the nuclear safety components has been already done. Based on reference documentation, the most important steps in risk informed ISI are discussed: scope definition, consequence evaluation, failure probability estimation, risk evaluation, non-destructive examination method selection and possibilities of implementation, monitoring and feedback. Recent experience on the ISI

  6. Auxiliary feedwater system risk-based inspection guide for the Diablo Canyon Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gore, B.F.; Vo, T.V.; Harrison, D.G.

    1990-08-01

    This document presents a compilation of auxiliary feedwater (AFW) system failure information which has been screened for risk significance in terms of failure frequency and degradation of system performance. It is a risk-prioritized listing of failure events and their causes that are significant enough to warrant consideration in inspection planning at Diablo Canyon. This information is presented to provide inspectors with increased resources for inspection planning at Diablo Canyon. The risk importance of various component failure modes was identified by analysis of the results of probabilistic risk assessments (PRAs) for many pressurized water reactors (PWRs). However, the component failure categories identified in PRAs are rather broad, because the failure data used in the PRAs is an aggregate of many individual failures having a variety of root causes. In order to help inspectors to focus on specific aspects of component operation, maintenance and design which might cause these failures, an extensive review of component failure information was performed to identify and rank the root causes of these component failures. Both Diablo Canyon and industry-wide failure information was analyzed. Failure causes were sorted on the basis of frequency of occurrence and seriousness of consequence, and categorized as common cause failures, human errors, design problems, or component failures. This information permits an inspector to concentrate on components important to the prevention of core damage. Other components which perform essential functions, but which are not included because of high reliability or redundancy, must also be addressed to ensure that degradation does not increase their failure probabilities, and hence their risk importances. 23 refs., 1 fig., 1 tab

  7. Optimal allocation of international atomic energy agency inspection resources

    International Nuclear Information System (INIS)

    Markin, J.T.

    1987-01-01

    Each year the Department of Safeguards of the International Atomic Energy Agency (IAEA) conducts inspections to confirm that nuclear materials and facilities are employed for peaceful purposes. Because of limited inspection resources, however, the IAEA cannot fully attain its safeguards goals either quantitatively as measured by the inspection effort negotiated in the facility attachments or qualitatively as measured by the IAEA criteria for evaluating attainment of safeguards goals. Under current IAEA procedures the allocation of inspection resources assigns essentially equal inspection effort to facilities of the same type. An alternative approach would incorporate consideration of all material categories and facilities to be assigned inspection resources when allocating effort to a particular facility. One such method for allocating inspection resources is based on the IAEA criteria. The criteria provide a framework for allocating inspection effort that includes a ranking of material types according to their safeguards importance, an implicit definition of inspection activities for each material and facility type, and criteria for judging the attainment of safeguards goals in terms of the quality and frequency of these inspection activities. This framework is applicable to resource allocation for an arbitrary group of facilities such as a state's fuel cycle, the facilities inspected by an operations division, or all of the facilities inspected by the IAEA

  8. Risk based economic optimization of investment decisions of regulated power distribution system operators; Risikobasierte wirtschaftliche Optimierung von Investitionsentscheidungen regulierter Stromnetzbetreiber

    Energy Technology Data Exchange (ETDEWEB)

    John, Oliver

    2012-07-01

    The author of the contribution under consideration reports on risk-based economic optimization of investment decisions of regulated power distribution system operators. The focus is the economically rational decision behavior of operators under certain regulatory requirements. Investments in power distribution systems form the items subject to decisions. Starting from a description of theoretical and practical regulatory approaches, their financial implications are quantified at first. On this basis, optimization strategies are derived with respect to the investment behavior. For this purpose, an optimization algorithm is developed and applied to exemplary companies. Finally, effects of uncertainties in regulatory systems are investigated. In this context, Monte Carlo simulations are used in conjunction with real options analysis.

  9. Stochastic multi-objective model for optimal energy exchange optimization of networked microgrids with presence of renewable generation under risk-based strategies.

    Science.gov (United States)

    Gazijahani, Farhad Samadi; Ravadanegh, Sajad Najafi; Salehi, Javad

    2018-02-01

    The inherent volatility and unpredictable nature of renewable generations and load demand pose considerable challenges for energy exchange optimization of microgrids (MG). To address these challenges, this paper proposes a new risk-based multi-objective energy exchange optimization for networked MGs from economic and reliability standpoints under load consumption and renewable power generation uncertainties. In so doing, three various risk-based strategies are distinguished by using conditional value at risk (CVaR) approach. The proposed model is specified as a two-distinct objective function. The first function minimizes the operation and maintenance costs, cost of power transaction between upstream network and MGs as well as power loss cost, whereas the second function minimizes the energy not supplied (ENS) value. Furthermore, the stochastic scenario-based approach is incorporated into the approach in order to handle the uncertainty. Also, Kantorovich distance scenario reduction method has been implemented to reduce the computational burden. Finally, non-dominated sorting genetic algorithm (NSGAII) is applied to minimize the objective functions simultaneously and the best solution is extracted by fuzzy satisfying method with respect to risk-based strategies. To indicate the performance of the proposed model, it is performed on the modified IEEE 33-bus distribution system and the obtained results show that the presented approach can be considered as an efficient tool for optimal energy exchange optimization of MGs. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  10. Cost-risk optimization of nondestructive inspection level

    International Nuclear Information System (INIS)

    Johnson, D.P.

    1978-01-01

    This paper develops a quantitative methodology for determining the nondestructive inspection (NDI) level that will result in a minimum cost product considering both type one inspection errors, acceptance of defective material units, and type two inspection errors, rejection of sound material units. This methodology represents an advance over fracture mechanics - nondestructive inspection (FM-NDI) design systems that do not consider type two inspection errors or the pre-inspection material quality. The inputs required for the methodology developed in this paper are (1) the rejection probability as a function of inspection size and imperfection size, (2) the flaw frequency (FF), as a function of imperfection size, (3) the probability of failure given the material unit contains an imperfection of a given size as a function of that given size, (4) the manufacturing cost per material unit, (5) the inspection cost per material unit, and (6) the average cost per failure including indirect costs. Four methods are identified for determining the flaw-frequency and three methods are identified for determining the conditional failure probability (one of these methods is probabilistic fracture mechanics). Methods for determining the rejection probability are discussed elsewhere. The NDI-FF methodology can have significant impact where the cost of failures represents a significant fraction of the manufacturing costs, or when a significant fraction of the components are being rejected by the inspection. (Auth.)

  11. An Empirical Study on Hedge Fund Portfolio Optimization, Mean-Risk Based Approaches

    OpenAIRE

    Li, Yang

    2011-01-01

    Abstract This research attempts to investigate the divergences between the Mean-Variance and the Mean-CVaR portfolio optimization methods in examining various assets classes, such as equities, bonds, and especially hedge funds. In order to get a thorough understanding of hedge funds facts and available optimization techniques, relevant literatures are carefully reviewed and incorporated into later stage computer modelling. By constructing three hypothetical portfolios, including traditiona...

  12. Maintenance optimization under non-constant probabilities of imperfect inspections

    NARCIS (Netherlands)

    Driessen, J.P.C.; Peng, H.; van Houtum, G.J.J.A.N.

    2017-01-01

    In this research, we study a single-component system that is characterized by three distinct deterioration states, cf. the Delay Time Model: normal, defective, and failed. The system is inspected periodically, and preventive system maintenance is done after a given number of inspections. The

  13. A Nonpolynomial Optimal Algorithm for Sequencing Inspectors in a Repeat Inspection System with Rework

    Directory of Open Access Journals (Sweden)

    Moon Hee Yang

    2015-01-01

    Full Text Available Assuming that two types of inspection errors are nonidentical and that only the items rejected by an inspector are reworked and sent to the next inspection cycle, we formulate a combinatorial optimization problem for simultaneously determining both the minimum frequency of inspection-rework cycles and the optimal sequence of inspectors selected from a set of available inspectors, in order to meet the constraints of the outgoing quality level. Based on the inherent properties from our mathematical model, we provide a nonpolynomial optimal algorithm with a time complexity of O(2m.

  14. Probabilistic runoff volume forecasting in risk-based optimization for RTC of urban drainage systems

    DEFF Research Database (Denmark)

    Löwe, Roland; Vezzaro, Luca; Mikkelsen, Peter Steen

    2016-01-01

    overflow risk. The stochastic control framework and the performance of the runoff forecasting models are tested in a case study in Copenhagen (76 km2 with 6 sub-catchments and 7 control points) using 2-h radar rainfall forecasts and inlet flows to control points computed from a variety of noisy...... smoothing. Simulations demonstrate notable improvements of the control efficiency when considering forecast information and additionally when considering forecast uncertainty, compared with optimization based on current basin fillings only....

  15. Non-periodic inspection optimization of multi-component and k-out-of-m systems

    International Nuclear Information System (INIS)

    Hajipour, Yassin; Taghipour, Sharareh

    2016-01-01

    This paper proposes a model to find the optimal non-periodic inspection interval over a finite planning horizon for two types of multi-component repairable systems. The first system contains hard-type and soft-type components, and the second system is a k-out-of-m system with m identical components. The failures of components in both systems follow a non-homogeneous Poisson process. A component can be a single part such as battery or line cord, or a subsystem, such as circuit breaker or charger in an infusion pump, which depending on their failures could be either replaced or minimally repaired according to their ages at failure. The systems are inspected at scheduled inspections or when an event of opportunistic inspection or a system failure occur. We develop a model to find the optimal inspection scheme for each system, which results in the minimum total expected cost over the system's lifecycle. We first develop a simulation model to obtain the total expected cost for a given non-periodic inspection scheme, and then integrate the simulation model with a genetic algorithm to obtain the optimal scheme more efficiently. - Highlights: • Non-periodic inspection optimization of two complex systems. • One system consists of soft-type and hard-type components. • The second system is a k-out-of-m system. • Integration of a simulation model and the genetic algorithm. • The model can be used when inspection is challenging or costly.

  16. A Risk-Based Multi-Objective Optimization Concept for Early-Warning Monitoring Networks

    Science.gov (United States)

    Bode, F.; Loschko, M.; Nowak, W.

    2014-12-01

    Groundwater is a resource for drinking water and hence needs to be protected from contaminations. However, many well catchments include an inventory of known and unknown risk sources which cannot be eliminated, especially in urban regions. As matter of risk control, all these risk sources should be monitored. A one-to-one monitoring situation for each risk source would lead to a cost explosion and is even impossible for unknown risk sources. However, smart optimization concepts could help to find promising low-cost monitoring network designs.In this work we develop a concept to plan monitoring networks using multi-objective optimization. Our considered objectives are to maximize the probability of detecting all contaminations and the early warning time and to minimize the installation and operating costs of the monitoring network. A qualitative risk ranking is used to prioritize the known risk sources for monitoring. The unknown risk sources can neither be located nor ranked. Instead, we represent them by a virtual line of risk sources surrounding the production well.We classify risk sources into four different categories: severe, medium and tolerable for known risk sources and an extra category for the unknown ones. With that, early warning time and detection probability become individual objectives for each risk class. Thus, decision makers can identify monitoring networks which are valid for controlling the top risk sources, and evaluate the capabilities (or search for least-cost upgrade) to also cover moderate, tolerable and unknown risk sources. Monitoring networks which are valid for the remaining risk also cover all other risk sources but the early-warning time suffers.The data provided for the optimization algorithm are calculated in a preprocessing step by a flow and transport model. Uncertainties due to hydro(geo)logical phenomena are taken into account by Monte-Carlo simulations. To avoid numerical dispersion during the transport simulations we use the

  17. The time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Hesheng; Lai, Yinping [Department of Automation,Shanghai Jiao Tong University, Shanghai (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China (China); Chen, Weidong, E-mail: wdchen@sjtu.edu.cn [Department of Automation,Shanghai Jiao Tong University, Shanghai (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China (China)

    2016-12-15

    In this paper, a new optimization model of time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator is designed. The task of this manipulator is to inspect the components of Tokamak, the inspecting velocity of manipulator must be limited in the operating space in order to get the clear pictures. With the limitation of joint velocity, acceleration and jerk, this optimization model can not only get the minimum working time along a specific path, but also ensure the imaging quality of camera through the constraint of inspecting velocity. The upper bound of the scanning speed is not a constant but changes according to the observation distance of camera in real time. The relation between scanning velocity and observation distance is estimated by curve-fitting. Experiment has been carried out to verify the feasibility of optimization model, moreover, the Laplace image sharpness evaluation method is adopted to evaluate the quality of images obtained by the proposed method.

  18. The time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator

    International Nuclear Information System (INIS)

    Wang, Hesheng; Lai, Yinping; Chen, Weidong

    2016-01-01

    In this paper, a new optimization model of time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator is designed. The task of this manipulator is to inspect the components of Tokamak, the inspecting velocity of manipulator must be limited in the operating space in order to get the clear pictures. With the limitation of joint velocity, acceleration and jerk, this optimization model can not only get the minimum working time along a specific path, but also ensure the imaging quality of camera through the constraint of inspecting velocity. The upper bound of the scanning speed is not a constant but changes according to the observation distance of camera in real time. The relation between scanning velocity and observation distance is estimated by curve-fitting. Experiment has been carried out to verify the feasibility of optimization model, moreover, the Laplace image sharpness evaluation method is adopted to evaluate the quality of images obtained by the proposed method.

  19. Towards risk-based structural integrity methods for PWRs

    International Nuclear Information System (INIS)

    Chapman, O.J.V.; Lloyd, R.B.

    1992-01-01

    This paper describes the development of risk-based structural integrity assurance methods and their application to Pressurized Water Reactor (PWR) plant. In-service inspection is introduced as a way of reducing the failure probability of high risk sites and the latter are identified using reliability analysis; the extent and interval of inspection can also be optimized. The methodology is illustrated by reference to the aspect of reliability of weldments in PWR systems. (author)

  20. Using ensemble weather forecast in a risk based real time optimization of urban drainage systems

    DEFF Research Database (Denmark)

    Courdent, Vianney Augustin Thomas; Vezzaro, Luca; Mikkelsen, Peter Steen

    2015-01-01

    Global Real Time Control (RTC) of urban drainage system is increasingly seen as cost-effective solution in order to respond to increasing performance demand (e.g. reduction of Combined Sewer Overflow, protection of sensitive areas as bathing water etc.). The Dynamic Overflow Risk Assessment (DORA......) strategy was developed to operate Urban Drainage Systems (UDS) in order to minimize the expected overflow risk by considering the water volume presently stored in the drainage network, the expected runoff volume based on a 2-hours radar forecast model and an estimated uncertainty of the runoff forecast....... However, such temporal horizon (1-2 hours) is relatively short when used for the operation of large storage facilities, which may require a few days to be emptied. This limits the performance of the optimization and control in reducing combined sewer overflow and in preparing for possible flooding. Based...

  1. Mean-variance model for portfolio optimization with background risk based on uncertainty theory

    Science.gov (United States)

    Zhai, Jia; Bai, Manying

    2018-04-01

    The aim of this paper is to develop a mean-variance model for portfolio optimization considering the background risk, liquidity and transaction cost based on uncertainty theory. In portfolio selection problem, returns of securities and assets liquidity are assumed as uncertain variables because of incidents or lacking of historical data, which are common in economic and social environment. We provide crisp forms of the model and a hybrid intelligent algorithm to solve it. Under a mean-variance framework, we analyze the portfolio frontier characteristic considering independently additive background risk. In addition, we discuss some effects of background risk and liquidity constraint on the portfolio selection. Finally, we demonstrate the proposed models by numerical simulations.

  2. Optimal non-periodic inspection for a multivariate degradation model

    NARCIS (Netherlands)

    Barker, C.T.; Newby, M.J.

    2009-01-01

    We address the problem of determining inspection and maintenance strategy for a system whose state is described by a multivariate stochastic process. We relax and extend the usual approaches. The system state is a multivariate stochastic process, decisions are based on a performance measure defined

  3. Risk based modelling

    International Nuclear Information System (INIS)

    Chapman, O.J.V.; Baker, A.E.

    1993-01-01

    Risk based analysis is a tool becoming available to both engineers and managers to aid decision making concerning plant matters such as In-Service Inspection (ISI). In order to develop a risk based method, some form of Structural Reliability Risk Assessment (SRRA) needs to be performed to provide a probability of failure ranking for all sites around the plant. A Probabilistic Risk Assessment (PRA) can then be carried out to combine these possible events with the capability of plant safety systems and procedures, to establish the consequences of failure for the sites. In this way the probability of failures are converted into a risk based ranking which can be used to assist the process of deciding which sites should be included in an ISI programme. This paper reviews the technique and typical results of a risk based ranking assessment carried out for nuclear power plant pipework. (author)

  4. Modeling and optimizing periodically inspected software rejuvenation policy based on geometric sequences

    International Nuclear Information System (INIS)

    Meng, Haining; Liu, Jianjun; Hei, Xinhong

    2015-01-01

    Software aging is characterized by an increasing failure rate, progressive performance degradation and even a sudden crash in a long-running software system. Software rejuvenation is an effective method to counteract software aging. A periodically inspected rejuvenation policy for software systems is studied. The consecutive inspection intervals are assumed to be a decreasing geometric sequence, and upon the inspection times of software system and its failure features, software rejuvenation or system recovery is performed. The system availability function and cost rate function are obtained, and the optimal inspection time and rejuvenation interval are both derived to maximize system availability and minimize cost rate. Then, boundary conditions of the optimal rejuvenation policy are deduced. Finally, the numeric experiment result shows the effectiveness of the proposed policy. Further compared with the existing software rejuvenation policy, the new policy has higher system availability. - Highlights: • A periodically inspected rejuvenation policy for software systems is studied. • A decreasing geometric sequence is used to denote the consecutive inspection intervals. • The optimal inspection times and rejuvenation interval are found. • The new policy is capable of reducing average cost and improving system availability

  5. The optimal amount and allocation of of sampling effort for plant health inspection

    NARCIS (Netherlands)

    Surkov, I.; Oude Lansink, A.G.J.M.; Werf, van der W.

    2009-01-01

    Plant import inspection can prevent the introduction of exotic pests and diseases, thereby averting economic losses. We explore the optimal allocation of a fixed budget, taking into account risk differentials, and the optimal-sized budget to minimise total pest costs. A partial-equilibrium market

  6. Human error considerations and annunciator effects in determining optimal test intervals for periodically inspected standby systems

    International Nuclear Information System (INIS)

    McWilliams, T.P.; Martz, H.F.

    1981-01-01

    This paper incorporates the effects of four types of human error in a model for determining the optimal time between periodic inspections which maximizes the steady state availability for standby safety systems. Such safety systems are characteristic of nuclear power plant operations. The system is modeled by means of an infinite state-space Markov chain. Purpose of the paper is to demonstrate techniques for computing steady-state availability A and the optimal periodic inspection interval tau* for the system. The model can be used to investigate the effects of human error probabilities on optimal availability, study the benefits of annunciating the standby-system, and to determine optimal inspection intervals. Several examples which are representative of nuclear power plant applications are presented

  7. RBI - Risk Based Inspection: new concept applied to management of FPSOs (Floating, Production and Storage Offshore) structural integrity; IBR-Inspecao baseada em risco: um novo conceito aplicado a gestao da integridade estrutural de FPSOs

    Energy Technology Data Exchange (ETDEWEB)

    Farias, Bruno de; Figueiredo, Eduardo; Luiz, Marcio [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Meurer, Gustavo; Duarte, Romulo; Belligotti, Rufo; Krzonkalla, Viviane [ABS Consulting, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Due to the difficulties of adapting the plan of inspection, typical of oil tankers, the units of the FPSO, began to occur large periods of unavailability of the cargo tanks. Also, with the expansion of the fleet, began to notice a difficulty in meeting the plan of inspection of the FPSO's hull. To improve the management of structural integrity of its FPSO's, PETROBRAS aims to ABS Consulting with the development and implementation of Risk-Based Inspection, known as RBI. This concept is applicable to various branches of industry. The companies began their implementation of oil by refineries. The development application for a ship's hull is recent and PETROBRAS is one of the first companies to implement the IBR for monitoring of the FPSO hull. (author)

  8. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  9. Joint optimal inspection and inventory for a k-out-of-n system

    International Nuclear Information System (INIS)

    Bjarnason, Erik T.S.; Taghipour, Sharareh; Banjevic, Dragan

    2014-01-01

    Purpose: The objective of this paper is to develop a model, which optimizes jointly the inspection frequency and the inventory level for a k-out-of-n system with repairable components whose failures are hidden. Scope: The system is periodically inspected to detect failed components, and the components are either minimally repaired or replaced with spares from the inventory. The system fails between periodic inspections if n−k+1 components are down; in that case, all failed components are inspected and rectified if possible. Otherwise, the failed components are rectified at periodic inspections. An emergency spare is ordered at a system failure, if the inventory is empty and all failed components require replacement. Methodology: Using analytical approach to find the optimal solution is computationally intensive and not practical; a simulation model is developed to solve the problem. Results: The proposed model harmonizes the maintenance and inventory policies and finds the joint optimal solution which results in a minimum total cost. Conclusion: The joint optimization model results in a lower cost compared to separate maintenance and inventory optimization models. Novelty: Few joint models for k-out-of-n systems exist, and none of them investigate repairable components whose failures are hidden and follow a non-homogeneous Poisson process. - Highlights: • We model a k-out-of-n system with hidden failures and inventory. • The system is periodically inspected and the inventory is periodically replenished. • Failed components are either replaced or minimally repaired. • A simulation model is developed to calculate the total expected cost. • The inspection interval and inventory level that minimizes the total cost is found

  10. Optimal periodic inspection of a deterioration process with sequential condition states

    International Nuclear Information System (INIS)

    Kallen, M.J.; Noortwijk, J.M. van

    2006-01-01

    The condition of components subject to visual inspections is often evaluated on a discrete scale. If at each inspection a decision is made to do nothing or to perform preventive or corrective maintenance, the proposed decision model allows us to determine the optimal time between periodic inspections, such that the expected average costs per unit of time are minimized. The model which describes the uncertain condition over time is based on a Markov process with sequential phases. The key quantities involved in the model are the probabilities of having to perform either preventive or corrective maintenance before or after an inspection. The costs functions for two scenarios are presented: a scenario in which failure is immediately detected without the need to perform an inspection and a scenario in which failure is only detected by inspection of the object. Analytical results for a special case and algorithmic results for a broad class of Markov processes are derived. The model is illustrated using an application to the periodic inspection of road bridges

  11. Proposal for inclusion of the risk based inspection technique in Regulatory Standard NR 13; Proposta de inclusao da tecnica de inspecao baseada em risco na Norma Regulamentadora NR 13

    Energy Technology Data Exchange (ETDEWEB)

    Esteves, Vinicius Teixeira; Lima, Marco Aurelio Oliveira [Det Norske Veritas Ltda. (DNV), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    In Brazil, the Regulatory Standard n. 13 (NR 13) establishes requirements for the inspection of boilers and pressure vessels which has main objective of preventing accidents with these types of equipment. Additionally, it has the Risk-Based Inspection (RBI) technique as an effective way to manage the mechanical integrity of various types of static mechanical equipment by through an inspection planning based on the risk factor. In this study, it is being proposed to include the RBI technique, in the NR 13, for the planning and definition of periods for the safety inspection of boilers and pressure vessels in order to promote an increase in the operational safety in process industries in Brazil. In this study it was carried out a critical analysis of NR 13 and RBI, and beyond that a bibliographic research of various international documents that relate the operational safety of pressurized equipment with the inspection activity, and the acceptability of RBI by governments, agencies and organizations around the world. It is considered that the inclusion and formal acceptance of RBI technique in the NR 13 must be accompanied by a rigorous control to avoid the 'trivialization' of its use and ensure the implementation rational, efficient and reliable. Finally, it was developed and suggested basic elements and minimum requirements to be inserted in the NR 13, to be attended, in order mandatory, by the companies that choose the implementation and use of the RBI technique as a tool for the planning of safety inspection of boilers and pressure vessels. It is concluded that the formal acceptance of the RBI technique in the NR 13 could aggregate much value to this standard, with regard to the prevention of accidents involving boilers or pressure vessels, and provide a technological jump to the companies that make use of RBI technique in Brazil. (author)

  12. Pipe degradation investigations for optimization of flow-accelerated corrosion inspection location selection

    International Nuclear Information System (INIS)

    Chandra, S.; Habicht, P.; Chexal, B.; Mahini, R.; McBrine, W.; Esselman, T.; Horowitz, J.

    1995-01-01

    A large amount of piping in a typical nuclear power plant is susceptible to Flow-Accelerated Corrosion (FAC) wall thinning to varying degrees. A typical PAC monitoring program includes the wall thickness measurement of a select number of components in order to judge the structural integrity of entire systems. In order to appropriately allocate resources and maintain an adequate FAC program, it is necessary to optimize the selection of components for inspection by focusing on those components which provide the best indication of system susceptibility to FAC. A better understanding of system FAC predictability and the types of FAC damage encountered can provide some of the insight needed to better focus and optimize the inspection plan for an upcoming refueling outage. Laboratory examination of FAC damaged components removed from service at Northeast Utilities' (NU) nuclear power plants provides a better understanding of the damage mechanisms involved and contributing causes. Selected results of this ongoing study are presented with specific conclusions which will help NU to better focus inspections and thus optimize the ongoing FAC inspection program

  13. Identification of optimal inspection interval via delay-time concept

    Directory of Open Access Journals (Sweden)

    Glauco Ricardo Simões Gomes

    2016-06-01

    Full Text Available This paper presents an application of mathematical modeling aimed at managing maintenance based on the delay-time concept. The study scenario was the manufacturing sector of an industrial unit, which operates 24 hours a day in a continuous flow of production. The main idea was to use the concepts of this approach to determine the optimal time of preventive action by the maintenance department in order to ensure the greatest availability of equipment and facilities at appropriate maintenance costs. After a brief introduction of the subject, the article presents topics that illustrate the importance of mathematical modeling in maintenance management and the delay-time concept. It also describes the characteristics of the company where the study was conducted, as well as the data related to the production process and maintenance actions. Finally, the results obtained after applying the delay-time concept are presented and discussed, as well as the limitations of the article and the proposals for future research.

  14. Quantitative approach for optimizing e-beam condition of photoresist inspection and measurement

    Science.gov (United States)

    Lin, Chia-Jen; Teng, Chia-Hao; Cheng, Po-Chung; Sato, Yoshishige; Huang, Shang-Chieh; Chen, Chu-En; Maruyama, Kotaro; Yamazaki, Yuichiro

    2018-03-01

    Severe process margin in advanced technology node of semiconductor device is controlled by e-beam metrology system and e-beam inspection system with scanning electron microscopy (SEM) image. By using SEM, larger area image with higher image quality is required to collect massive amount of data for metrology and to detect defect in a large area for inspection. Although photoresist is the one of the critical process in semiconductor device manufacturing, observing photoresist pattern by SEM image is crucial and troublesome especially in the case of large image. The charging effect by e-beam irradiation on photoresist pattern causes deterioration of image quality, and it affect CD variation on metrology system and causes difficulties to continue defect inspection in a long time for a large area. In this study, we established a quantitative approach for optimizing e-beam condition with "Die to Database" algorithm of NGR3500 on photoresist pattern to minimize charging effect. And we enhanced the performance of measurement and inspection on photoresist pattern by using optimized e-beam condition. NGR3500 is the geometry verification system based on "Die to Database" algorithm which compares SEM image with design data [1]. By comparing SEM image and design data, key performance indicator (KPI) of SEM image such as "Sharpness", "S/N", "Gray level variation in FOV", "Image shift" can be retrieved. These KPIs were analyzed with different e-beam conditions which consist of "Landing Energy", "Probe Current", "Scanning Speed" and "Scanning Method", and the best e-beam condition could be achieved with maximum image quality, maximum scanning speed and minimum image shift. On this quantitative approach of optimizing e-beam condition, we could observe dependency of SEM condition on photoresist charging. By using optimized e-beam condition, measurement could be continued on photoresist pattern over 24 hours stably. KPIs of SEM image proved image quality during measurement and

  15. Validation of statistical assessment method for the optimization of the inspection need for nuclear steam generators

    International Nuclear Information System (INIS)

    Wallin, K.; Voskamp, R.; Schmibauer, J.; Ostermeyer, H.; Nagel, G.

    2011-01-01

    The cost of steam generator inspections in nuclear power plants is high. A new quantitative assessment methodology for the accumulation of flaws due to stochastic causes like fretting has been developed for cases where limited inspection data is available. Additionally, a new quantitative assessment methodology for the accumulation of environment related flaws, caused e.g. by corrosion in steam generator tubes, has been developed. The method that combines deterministic information regarding flaw initiation and growth with stochastic elements connected to environmental aspects requires only knowledge of the experimental flaw accumulation history. The method, combining both types of flaw types, provides a complete description of the flaw accumulation and there are several possible uses of the method. The method can be used to evaluate the total life expectancy of the steam generator and simple statistically defined plugging criteria can be established based on flaw behaviour. This way the inspection interval and inspection coverage can be optimized with respect to allowable flaws and the method can recognize flaw type subsets requiring more frequent inspection intervals. The method can also be used to develop statistically realistic safety factors accounting for uncertainties in inspection flaw sizing and detection. The statistical assessment method has been showed to be robust and insensitive to different assessments of plugged tubes. Because the procedure is re-calibrated after each inspection, it reacts effectively to possible changes in the steam generator environment. Validation of the assessment method is provided for real steam generators, both in the case of stochastic damage as well as environment related flaws. (authors)

  16. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  17. Risk Based Maintenance of Offshore Wind Turbines Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    This paper presents how Bayesian networks can be used to make optimal decisions for repairs of offshore wind turbines. The Bayesian network is an efficient tool for updating a deterioration model whenever new information becomes available from inspections/monitoring. The optimal decision is found...... such that the preventive maintenance effort is balanced against the costs to corrective maintenance including indirect costs to reduced production. The basis for the optimization is the risk based Bayesian decision theory. The method is demonstrated through an application example....

  18. Analysis and optimization on in-vessel inspection robotic system for EAST

    International Nuclear Information System (INIS)

    Zhang, Weijun; Zhou, Zeyu; Yuan, Jianjun; Du, Liang; Mao, Ziming

    2015-01-01

    Since China has successfully built her first Experimental Advanced Superconducting TOKAMAK (EAST) several years ago, great interest and demand have been increasing in robotic in-vessel inspection/operation systems, by which an observation of in-vessel physical phenomenon, collection of visual information, 3D mapping and localization, even maintenance are to be possible. However, it has been raising many challenges to implement a practical and robust robotic system, due to a lot of complex constraints and expectations, e.g., high remanent working temperature (100 °C) and vacuum (10"−"3 pa) environment even in the rest interval between plasma discharge experiments, close-up and precise inspection, operation efficiency, besides a general kinematic requirement of D shape irregular vessel. In this paper we propose an upgraded robotic system with redundant degrees of freedom (DOF) manipulator combined with a binocular vision system at the tip and a virtual reality system. A comprehensive comparison and discussion are given on the necessity and main function of the binocular vision system, path planning for inspection, fast localization, inspection efficiency and success rate in time, optimization of kinematic configuration, and the possibility of underactuated mechanism. A detailed design, implementation, and experiments of the binocular vision system together with the recent development progress of the whole robotic system are reported in the later part of the paper, while, future work and expectation are described in the end.

  19. Analysis and optimization on in-vessel inspection robotic system for EAST

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Weijun, E-mail: zhangweijun@sjtu.edu.cn; Zhou, Zeyu; Yuan, Jianjun; Du, Liang; Mao, Ziming

    2015-12-15

    Since China has successfully built her first Experimental Advanced Superconducting TOKAMAK (EAST) several years ago, great interest and demand have been increasing in robotic in-vessel inspection/operation systems, by which an observation of in-vessel physical phenomenon, collection of visual information, 3D mapping and localization, even maintenance are to be possible. However, it has been raising many challenges to implement a practical and robust robotic system, due to a lot of complex constraints and expectations, e.g., high remanent working temperature (100 °C) and vacuum (10{sup −3} pa) environment even in the rest interval between plasma discharge experiments, close-up and precise inspection, operation efficiency, besides a general kinematic requirement of D shape irregular vessel. In this paper we propose an upgraded robotic system with redundant degrees of freedom (DOF) manipulator combined with a binocular vision system at the tip and a virtual reality system. A comprehensive comparison and discussion are given on the necessity and main function of the binocular vision system, path planning for inspection, fast localization, inspection efficiency and success rate in time, optimization of kinematic configuration, and the possibility of underactuated mechanism. A detailed design, implementation, and experiments of the binocular vision system together with the recent development progress of the whole robotic system are reported in the later part of the paper, while, future work and expectation are described in the end.

  20. Enhancing native defect sensitivity for EUV actinic blank inspection: optimized pupil engineering and photon noise study

    Science.gov (United States)

    Wang, Yow-Gwo; Neureuther, Andrew; Naulleau, Patrick

    2016-03-01

    In this paper, we discuss the impact of optimized pupil engineering and photon noise on native defect sensitivity in EUV actinic blank inspection. Native defects include phase-dominated defects, absorber defects, and defects with a combination of phase and absorption behavior. First, we extend the idea of the Zernike phase contrast (ZPC) method and study the impact of optimum phase shift in the pupil plane on native defect sensitivity, showing a 23% signal-to-noise ratio (SNR) enhancement compare to bright field (BF) for a phase defect with 20% absorption. We also describe the possibility to increase target defect SNR on target defect sizes at the price of losing the sensitivity on smaller (non-critical) defects. Moreover, we show the advantage of the optimized phase contrast (OZPC) method over BF EUV actinic blank inspection. A single focus scan from OZPC has better inspection efficiency over BF. Second, we make a detailed comparison between the phase contrast with apodization (AZPC) method and dark field (DF) method based on defect sensitivity in the presence of both photon shot noise and camera noise. Performance is compared for a variety of photon levels, mask roughness conditions, and combinations of defect phase and absorption.

  1. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  2. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  3. Future plans for performance analysis and maintenance/inspection optimization of shutoff rods based on the case study of Bruce Power Unit-3 Shutoff Rod 5 inspection

    International Nuclear Information System (INIS)

    Nasimi, E.; Gabbar, H.A.

    2011-01-01

    Shutdown System 1 (SDS1) is a preferred method for a quick shutdown of nuclear fission process in CANDU (CANada Deuterium Uranium) reactor units. Failure of a routine SDS1 safety test during Fall 2009 outage resulted in the need to develop and execute a new methodology for Shutoff Rod inspection and re-evaluate the known degradation mechanisms and failure modes. This paper describes the development of this methodology and the obtained results. It also proposes several alternative solutions for the future performance analysis and maintenance/inspection optimization for SDS1 Shutoff Rods based on the Bruce Power Unit-3 Shutoff Rod 5 case study. (author)

  4. A risk-based multi-objective model for optimal placement of sensors in water distribution system

    Science.gov (United States)

    Naserizade, Sareh S.; Nikoo, Mohammad Reza; Montaseri, Hossein

    2018-02-01

    In this study, a new stochastic model based on Conditional Value at Risk (CVaR) and multi-objective optimization methods is developed for optimal placement of sensors in water distribution system (WDS). This model determines minimization of risk which is caused by simultaneous multi-point contamination injection in WDS using CVaR approach. The CVaR considers uncertainties of contamination injection in the form of probability distribution function and calculates low-probability extreme events. In this approach, extreme losses occur at tail of the losses distribution function. Four-objective optimization model based on NSGA-II algorithm is developed to minimize losses of contamination injection (through CVaR of affected population and detection time) and also minimize the two other main criteria of optimal placement of sensors including probability of undetected events and cost. Finally, to determine the best solution, Preference Ranking Organization METHod for Enrichment Evaluation (PROMETHEE), as a subgroup of Multi Criteria Decision Making (MCDM) approach, is utilized to rank the alternatives on the trade-off curve among objective functions. Also, sensitivity analysis is done to investigate the importance of each criterion on PROMETHEE results considering three relative weighting scenarios. The effectiveness of the proposed methodology is examined through applying it to Lamerd WDS in the southwestern part of Iran. The PROMETHEE suggests 6 sensors with suitable distribution that approximately cover all regions of WDS. Optimal values related to CVaR of affected population and detection time as well as probability of undetected events for the best optimal solution are equal to 17,055 persons, 31 mins and 0.045%, respectively. The obtained results of the proposed methodology in Lamerd WDS show applicability of CVaR-based multi-objective simulation-optimization model for incorporating the main uncertainties of contamination injection in order to evaluate extreme value

  5. Genetic Optimization and Simulation of a Piezoelectric Pipe-Crawling Inspection Robot

    Science.gov (United States)

    Hollinger, Geoffrey A.; Briscoe, Jeri M.

    2004-01-01

    Using the DarwinZk development software, a genetic algorithm (GA) was used to design and optimize a pipe-crawling robot for parameters such as mass, power consumption, and joint extension to further the research of the Miniature Inspection Systems Technology (MIST) team. In an attempt to improve on existing designs, a new robot was developed, the piezo robot. The final proposed design uses piezoelectric expansion actuators to move the robot with a 'chimneying' method employed by mountain climbers and greatly improves on previous designs in load bearing ability, pipe traversing specifications, and field usability. This research shows the advantages of GA assisted design in the field of robotics.

  6. A risk-based approach to optimize autologous hematopoietic stem cell (HSC) collection with the use of plerixafor.

    Science.gov (United States)

    Abhyankar, S; DeJarnette, S; Aljitawi, O; Ganguly, S; Merkel, D; McGuirk, J

    2012-04-01

    Autologous hematopoietic stem cell (HSC) transplant is an effective treatment for patients with hematological malignancies. Unfortunately, 15-30% of patients fail to mobilize a sufficient number of HSCs for the transplant. Plerixafor is now used as a salvage mobilization regimen, with good success. We describe here a risk-based approach for the use of plerixafor, based on the circulating CD34(+) cell count and the CD34(+) cell dose collected after 4 days of G-CSF, that identifies potential poor HSC mobilizers upfront. A total of 159 patients underwent HSC collections using this approach. Of these, 55 (35%) were identified as high risk owing to low CD34(+) cell number or low yield on day 1 of collection, and received plerixafor on the subsequent days of collection. Of the 159 patients, 151 (95%) were able to provide adequate collections with the first mobilization attempt in a median of 1.7 days using this approach. Of the eight who failed initial mobilization, 5 successfully underwent re-mobilization with plerixafor and G-CSF and 3 (1.9%) were mobilization failures. This approach helped to control the overall cost of HSC collections for our BMT program by decreasing the need for remobilization, reducing the number of collection days and avoiding the use of plerixafor in all patients.

  7. Optimization of ultrasonic array inspections using an efficient hybrid model and real crack shapes

    Energy Technology Data Exchange (ETDEWEB)

    Felice, Maria V., E-mail: maria.felice@bristol.ac.uk [Department of Mechanical Engineering, University of Bristol, Bristol, U.K. and NDE Laboratory, Rolls-Royce plc., Bristol (United Kingdom); Velichko, Alexander, E-mail: p.wilcox@bristol.ac.uk; Wilcox, Paul D., E-mail: p.wilcox@bristol.ac.uk [Department of Mechanical Engineering, University of Bristol, Bristol (United Kingdom); Barden, Tim; Dunhill, Tony [NDE Laboratory, Rolls-Royce plc., Bristol (United Kingdom)

    2015-03-31

    Models which simulate the interaction of ultrasound with cracks can be used to optimize ultrasonic array inspections, but this approach can be time-consuming. To overcome this issue an efficient hybrid model is implemented which includes a finite element method that requires only a single layer of elements around the crack shape. Scattering Matrices are used to capture the scattering behavior of the individual cracks and a discussion on the angular degrees of freedom of elastodynamic scatterers is included. Real crack shapes are obtained from X-ray Computed Tomography images of cracked parts and these shapes are inputted into the hybrid model. The effect of using real crack shapes instead of straight notch shapes is demonstrated. An array optimization methodology which incorporates the hybrid model, an approximate single-scattering relative noise model and the real crack shapes is then described.

  8. Risk-Based Two-Stage Stochastic Optimization Problem of Micro-Grid Operation with Renewables and Incentive-Based Demand Response Programs

    Directory of Open Access Journals (Sweden)

    Pouria Sheikhahmadi

    2018-03-01

    Full Text Available The operation problem of a micro-grid (MG in grid-connected mode is an optimization one in which the main objective of the MG operator (MGO is to minimize the operation cost with optimal scheduling of resources and optimal trading energy with the main grid. The MGO can use incentive-based demand response programs (DRPs to pay an incentive to the consumers to change their demands in the peak hours. Moreover, the MGO forecasts the output power of renewable energy resources (RERs and models their uncertainties in its problem. In this paper, the operation problem of an MGO is modeled as a risk-based two-stage stochastic optimization problem. To model the uncertainties of RERs, two-stage stochastic programming is considered and conditional value at risk (CVaR index is used to manage the MGO’s risk-level. Moreover, the non-linear economic models of incentive-based DRPs are used by the MGO to change the peak load. The numerical studies are done to investigate the effect of incentive-based DRPs on the operation problem of the MGO. Moreover, to show the effect of the risk-averse parameter on MGO decisions, a sensitivity analysis is carried out.

  9. Optimizing inspection intervals—Reliability and availability in terms of a cost model: A case study on railway carriers

    International Nuclear Information System (INIS)

    Wolde, Mike ten; Ghobbar, Adel A.

    2013-01-01

    This paper states the problem that railway carriers have with inspections and maintenance in its most cost optimal way. Often there is external pressure to improve reliability and availability and to reduce costs significantly. To overcome this problem this paper suggests a model that tries to find the optimal inspection interval. Not all maintenance companies have their inspection intervals that match with the actual reliability of a system anymore and the inspection intervals are not necessarily at a cost optimum. This research retrieves the actual failure and repair data and combines this together with the availability of a system to find the optimum inspection interval in terms of costs. The application of the optimization approach to a railway carrier maintenance company in the Netherlands is also presented. -- Highlights: ► New optimization technique for reliability and availability by minimizing costs. ► Adaptable to multiple types of repairs. ► Usable as a practical model. ► Applicable to the FMECA, RCM and ISO31000 risk management methods

  10. An extended optimal replacement model for a deteriorating system with inspections

    International Nuclear Information System (INIS)

    Sheu, Shey-Huei; Tsai, Hsin-Nan; Wang, Fu-Kwun; Zhang, Zhe George

    2015-01-01

    This study considers a generalized replacement model for a deteriorating system in which failures can only be detected by inspection. The system is assumed to have two types of failures and is replaced at the occurrence of the Nth type I failure (minor failure), or the first type II failure (catastrophic failure), or at working age T, whichever occurs first. The probability of a type I or type II failure depends on the number of type I failures since the previous replacement. Such a system can be repaired after a type I failure, but is deteriorating stochastically. That is, the operating intervals are decreasing stochastically, whereas the durations of the repairs are increasing stochastically. Based on these assumptions, we determine the expected net cost rate and discuss various special cases of the model. Finally, we develop a computational algorithm for finding the optimal policy and present a numerical example to show the properties of the proposed model. - Highlight: • Replacement policy for system subject two types of failures or the system's working age. • Failures detected by inspections. • Decreasing operating times and increasing repair times. • Derive a cost function. • Determine the cost minimization policy

  11. METHODOLOGY AND ALGORITHM OF OPTIMIZATION OF THE NEED OF SETTLEMENTS FOR TECHNICAL INSPECTION LINES FOR VEHICLES

    Directory of Open Access Journals (Sweden)

    Maslennikov Valeriy Aleksandrovich

    2016-06-01

    Full Text Available The current methods of predicting the demand of the community for the lines of technical inspection of vehicles do not fully take into account the probabilistic and statistical nature of the complaints of car owners. This results in significant mistakes in the determination of the number of such lines, accompanied by insufficient rhythm of their operation. The design errors related to the complexity of accurate account for calendar fluctuations of the number of appeals can be partially or completely eliminated by using mathematical apparatus of the queuing theory. In this case, the complex technical system is considered as an open multi-channel queuing system with limited queue length. The received flows and serviced requests are considered to be the simplest. From a practical point of view, the replacement of one type of computational model by the other allows ensuring a more sustainable mode of calculating operations using the computer. The paper also provides a calculation expression for defining the lower and upper confidence limits of the dispersion of the average values of the number of arrivals of vehicles at the technical inspection that allows setting the interval of uncertainty for searching the optimal solution.

  12. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  13. The need to optimize inservice testing and inspection to enhance safety

    International Nuclear Information System (INIS)

    Perry, J.A.

    1996-01-01

    Welcome to the Fourth U.S. Nuclear Regulatory Commission and American Society of Mechanical Engineers (USNRC/ASME) Symposium on Valve and Pump Testing in Nuclear Power Plants. This symposium provides a forum to exchange information on technical and regulatory issues associated with the testing of valves and pumps used in nuclear power plants. Progress made since the last symposium will be discussed along with various methods for in service testing of valves and pumps. Active participation by industry representatives, regulators and consultants will entail discussion of a broad array of ideas and points of view regarding how to improve the in service testing of valves and pumps at nuclear power plants. One of the challenges faced is the need to optimize the in service testing and inspection to enhance safety, operability and reliability. The author addresses this challenge from an ASME Nuclear Codes and Standards point of view

  14. The need to optimize inservice testing and inspection to enhance safety

    Energy Technology Data Exchange (ETDEWEB)

    Perry, J.A.

    1996-12-01

    Welcome to the Fourth U.S. Nuclear Regulatory Commission and American Society of Mechanical Engineers (USNRC/ASME) Symposium on Valve and Pump Testing in Nuclear Power Plants. This symposium provides a forum to exchange information on technical and regulatory issues associated with the testing of valves and pumps used in nuclear power plants. Progress made since the last symposium will be discussed along with various methods for in service testing of valves and pumps. Active participation by industry representatives, regulators and consultants will entail discussion of a broad array of ideas and points of view regarding how to improve the in service testing of valves and pumps at nuclear power plants. One of the challenges faced is the need to optimize the in service testing and inspection to enhance safety, operability and reliability. The author addresses this challenge from an ASME Nuclear Codes and Standards point of view.

  15. Improved Titanium Billet Inspection Sensitivity through Optimized Phased Array Design, Part II: Experimental Validation and Comparative Study with Multizone

    International Nuclear Information System (INIS)

    Hassan, W.; Vensel, F.; Knowles, B.; Lupien, V.

    2006-01-01

    The inspection of critical rotating components of aircraft engines has made important advances over the last decade. The development of Phased Array (PA) inspection capability for billet and forging materials used in the manufacturing of critical engine rotating components has been a priority for Honeywell Aerospace. The demonstration of improved PA inspection system sensitivity over what is currently used at the inspection houses is a critical step in the development of this technology and its introduction to the supply base as a production inspection. As described in Part I (in these proceedings), a new phased array transducer was designed and manufactured for optimal inspection of eight inch diameter Ti-6Al-4V billets. After confirming that the transducer was manufactured in accordance with the design specifications a validation study was conducted to assess the sensitivity improvement of the PAI over the current capability of Multi-zone (MZ) inspection. The results of this study confirm the significant (≅ 6 dB in FBH number sign sensitivity) improvement of the PAI sensitivity over that of MZI

  16. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  17. Port-of-entry safety via the reliability optimization of container inspection strategy through an evolutionary approach

    International Nuclear Information System (INIS)

    Ramirez-Marquez, Jose Emmanuel

    2008-01-01

    Up to now, of all the containers received in USA ports, roughly between 2% and 5% are scrutinized to determine if they could cause some type of danger or contain suspicious goods. Recently, concerns have been raised regarding the type of attack that could happen via container cargo leading to devastating economic, psychological and sociological effects. Overall, this paper is concerned with developing an inspection strategy that minimizes the total cost of inspection while maintaining a user-specified detection rate for 'suspicious' containers. In this respect, a general model for describing an inspection strategy is proposed. The strategy is regarded as an (n+1)-echelon decision tree where at each of these echelons, a decision has to be taken, regarding which sensor to be used, if at all. Second, based on the general decision-tree model, this paper presents a minimum cost container inspection strategy that conforms to a pre-specified user detection rate under the assumption that different sensors with different reliability and cost characteristics can be used. To generate an optimal inspection strategy, an evolutionary optimization approach known as probabilistic solution discovery algorithm has been used

  18. Optimising import phytosanitary inspection

    NARCIS (Netherlands)

    Surkov, I.

    2007-01-01

    Keywords: quarantine pest, plant health policy, optimization, import phytosanitary inspection, ‘reduced checks’, optimal allocation of resources, multinomial logistic regression, the Netherlands World trade is a major vector of spread of quarantine plant pests. Border phytosanitary inspection

  19. Risk-Based Operation and Maintenance of Offshore Wind Turbines using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    the lifetime. Two different approaches are used; one uses a threshold value of the failure probability, and one uses a Limited Memory Influence Diagram. Both methods are tested for an application example using MonteCarlo sampling, and they are both found to be efficient and equally good.......For offshore wind farms, the costs due to operation and maintenance are large, and more optimal planning has the potential of reducing these costs. This paper presents how Bayesian networks can be used for risk-based inspection planning, where the inspection plans are updated each year through...

  20. Optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 with an optimized cost perspective

    International Nuclear Information System (INIS)

    Jinil Mok; Poong Hyun Seong

    1996-01-01

    In this work, a model for determining the optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 is developed, which is to minimize economic loss caused by inadvertent trip and the system failure. This model uses cost benefit analysis method and the part for optimal inspection period considers the human error. The model is based on three factors as follows: (i) The cumulative failure distribution function of the safety system, (ii) The probability that the safety system does not operate due to failure of the system or human error when the safety system is needed at an emergency condition and (iii) The average probability that the reactor is tripped due to the failure of system components or human error. The model then is applied to evaluate the safety system in Wolsung Nuclear Power Plant Unit 1. The optimal replacement periods which are calculated with proposed model differ from those used in Wolsung NPP Unit 1 by about a few days or months, whereas the optimal inspection periods are in about the same range. (author)

  1. Improvements of visual X-ray inspection with optimized digital detector technology. Faster and more reliable inspection with High Dynamic Radiology (HDR)

    International Nuclear Information System (INIS)

    Bavendiek, Klaus

    2010-01-01

    Improvements in speed and contrast resolution of Digital Detector Arrays (DDA) and significant higher power of X-Ray tubes in combination with a small focal spot open the door to an improved visual inspection of castings for automotive and aerospace applications. The result is a film-like image quality of castings in a live view. For the new image quality the x-ray parameter have to be optimized in energy and the subject contrast has to be increased to avoid that flaws are covered by the noise in the image. HDR - high dynamic radiology - expands the local contrast in the image and transfers the grey values to the range the human inspector can separate. Due to the movement in the image the inspector gets a glas-like impression of the object and the flaws allowing him to do a decision about the 3D position of a flaw in the object. (orig.)

  2. An Eddy Current Testing Platform System for Pipe Defect Inspection Based on an Optimized Eddy Current Technique Probe Design

    Science.gov (United States)

    Rifai, Damhuji; Abdalla, Ahmed N.; Razali, Ramdan; Ali, Kharudin; Faraj, Moneer A.

    2017-01-01

    The use of the eddy current technique (ECT) for the non-destructive testing of conducting materials has become increasingly important in the past few years. The use of the non-destructive ECT plays a key role in the ensuring the safety and integrity of the large industrial structures such as oil and gas pipelines. This paper introduce a novel ECT probe design integrated with the distributed ECT inspection system (DSECT) use for crack inspection on inner ferromagnetic pipes. The system consists of an array of giant magneto-resistive (GMR) sensors, a pneumatic system, a rotating magnetic field excitation source and a host PC acting as the data analysis center. Probe design parameters, namely probe diameter, an excitation coil and the number of GMR sensors in the array sensor is optimized using numerical optimization based on the desirability approach. The main benefits of DSECT can be seen in terms of its modularity and flexibility for the use of different types of magnetic transducers/sensors, and signals of a different nature with either digital or analog outputs, making it suited for the ECT probe design using an array of GMR magnetic sensors. A real-time application of the DSECT distributed system for ECT inspection can be exploited for the inspection of 70 mm carbon steel pipe. In order to predict the axial and circumference defect detection, a mathematical model is developed based on the technique known as response surface methodology (RSM). The inspection results of a carbon steel pipe sample with artificial defects indicate that the system design is highly efficient. PMID:28335399

  3. PENGARUH PELAKSANAAN RISK BASED INTERNAL AUDITING TERHADAP PENCEGAHAN FRAUD

    Directory of Open Access Journals (Sweden)

    Rozmita Dewi Yuniarti Rozali

    2015-12-01

    Full Text Available This study aims to determine the effect of implementation of risk based internal auditing on fraud prevention on internal audit Inspection Office Bank BRI Bandung Region. The sample used by 18 internal auditors in Inspection Office of Bank BRI Bandung Region saturated sampling method. Based on calculation of simple regression analysis obtained result that every increase of implementation of risk based internal auditing (X will lead to increase fraud prevention (Y. It shows that there is a positive influence between the implementation of risk based internal auditing on fraud prevention on the internal audit of Inspection Office of Bank BRI Bandung Region.

  4. Risk-Based Sampling: I Don't Want to Weight in Vain.

    Science.gov (United States)

    Powell, Mark R

    2015-12-01

    Recently, there has been considerable interest in developing risk-based sampling for food safety and animal and plant health for efficient allocation of inspection and surveillance resources. The problem of risk-based sampling allocation presents a challenge similar to financial portfolio analysis. Markowitz (1952) laid the foundation for modern portfolio theory based on mean-variance optimization. However, a persistent challenge in implementing portfolio optimization is the problem of estimation error, leading to false "optimal" portfolios and unstable asset weights. In some cases, portfolio diversification based on simple heuristics (e.g., equal allocation) has better out-of-sample performance than complex portfolio optimization methods due to estimation uncertainty. Even for portfolios with a modest number of assets, the estimation window required for true optimization may imply an implausibly long stationary period. The implications for risk-based sampling are illustrated by a simple simulation model of lot inspection for a small, heterogeneous group of producers. © 2015 Society for Risk Analysis.

  5. A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections

    International Nuclear Information System (INIS)

    Tsai, Hsin-Nan; Sheu, Shey-Huei; Zhang, Zhe George

    2017-01-01

    In this article, we study a trivariate replacement model for a deteriorating system consisting of two units. Failures of unit 1 can be classified into two types. Type I failure (minor failure) is fixed by a minimal repair and type II failure (catastrophic failure) is removed by a replacement. Both types of failures can only be detected through inspection. Each type I failure of unit 1 will result in a random amount of damage to unit 2 and the damages are cumulative. The probability of type I failure or type II failure is assumed to depend on the number of failures since the last replacement. We formulate a replacement policy based on the number of type I failure, the occurrence of the first type II failure, and the amount of accumulative damages. Hence the system is replaced either preventively or correctively at any of the following four conditions depend on whichever occurs first; preventively (a) at the Nth type I failure; or (b) when the total damage of unit 2 exceeds a pre-specified level Z (but less than the failure level l); and, correctively (c) at the first type II failure; or (d) when the total damage of unit 2 exceeds a failure level l, where Z and l represent the thresholds of total damage level for unit 2 to preventive and corrective replacements, respectively. Although a type I failure can be fixed by a minimal repair, but the operating period is stochastically decreasing and repair time is stochastically increasing as time goes on. The minimal total expected long-run net cost per unit time of the system is derived and a computational algorithm for determining the optimal policy is developed. A real-world application from electric power industry is provided. Several past studied are shown to be special cases of our model. Finally, a numerical example is presented. - Highlights: • A trivariate replacement policy for a deteriorating system with two units is proposed. • A real-world application from the electric power industry is provided. • The

  6. New developments for optimization of automatic inspections in nuclear power plants

    International Nuclear Information System (INIS)

    Bollini, G.J.; Gonzalez, B.

    1989-01-01

    One of the most important factors to be taken into acount with respect to remote control mechanized inspection tasks carried out during refueling outages in nuclear power plants, which include components and systems as varied as the reactor vessel, nozzles, piping, vessel head closure bolts, turbine discs, etc., is the unification of systems used to control the inspection systems themselves. Likewise, the implementation in these systems of specific functions simplifying operational sequences and confirming correct execution of work implies a set of criteria that must be taken into account if the reliability of the tasks carried out is to be increased. The system presented in this paper, SIROCCO (Sistema Robotizado de Control) has been designed taking into consideration the above mentioned criteria, with two clear obectives in mind: a reduction in inspection times and in the dose received by the participating technical personnel, and an increase in the reliability of the electronic equipment used. In February and March of this year, during shutdown of a BMR-type nuclear power plant, several SIROCCO control units were usids in mechanized inspection systems of various kinds, applicable to components such as those mentioned above, with forecasts regarding the reduction of inspection times being met. The main reasons for this reduction were the familiarity of the operators with this single control system, the unification of replacement parts for equipment maintenance and the availability of interchangeable units. This philosophy of unification of electronic systems also includes data acquisition and the transmission of information between different areas, which require the unification of control systems already commented and accomplished. This course of action is currently under development at Tecnatom. (author). 4 figs

  7. Improved Titanium Billet Inspection Sensitivity through Optimized Phased Array Design, Part I: Design Technique, Modeling and Simulation

    International Nuclear Information System (INIS)

    Lupien, Vincent; Hassan, Waled; Dumas, Philippe

    2006-01-01

    Reductions in the beam diameter and pulse duration of focused ultrasound for titanium inspections are believed to result in a signal-to-noise ratio improvement for embedded defect detection. It has been inferred from this result that detection limits could be extended to smaller defects through a larger diameter, higher frequency transducer resulting in a reduced beamwidth and pulse duration. Using Continuum Probe Designer TM (Pat. Pending), a transducer array was developed for full coverage inspection of 8 inch titanium billets. The main challenge in realizing a large aperture phased array transducer for billet inspection is ensuring that the number of elements remains within the budget allotted by the driving electronics. The optimization technique implemented by Continuum Probe Designer TM yields an array with twice the aperture but the same number of elements as existing phased arrays for the same application. The unequal area element design was successfully manufactured and validated both numerically and experimentally. Part I of this two-part series presents the design, simulation and modeling steps, while Part II presents the experimental validation and comparative study to multizone

  8. Optimal replacement and inspection periods of safety and control boards in Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il

    1993-02-01

    upon to act when emergency conditions develop. To ensure their operability, the systems are periodically tested. In this paper, unavailability formulae for 2-out-of-3 logic configurations are developed, taking into account the probability of failure of channels tested due to human error in the simultaneous testing scheme. The probability of the channel being down due to human error is assumed to depend on the number of channel which have gone through the tests consecutively prior to the inspection of the channel under consideration. The system unavailability is the sum of unavailability due to hardware failure alone and the unavailability contribution due to human error. And we considered the probability that the reactor will be tripped during surveillance test. We determined the optimal inspection periods of safety system, taking into account both unavailability of safety system and the probability that the reactor will be tripped during surveillance test. We compared these periods with the inspection periods currently used at Wolsung NPP Unit 1. As a consequence, the inspection periods obtained using a minimum human error (8.24 x 10 -6 ) are shorter than those currently used in Wolsung NPP unit 1 while inspection periods obtained using a maximum human error is (4.44 x10 -4 ) longer than those used in Wolsung NPP unit 1

  9. Optimization of an Optical Inspection System Based on the Taguchi Method for Quantitative Analysis of Point-of-Care Testing

    Directory of Open Access Journals (Sweden)

    Chia-Hsien Yeh

    2014-09-01

    Full Text Available This study presents an optical inspection system for detecting a commercial point-of-care testing product and a new detection model covering from qualitative to quantitative analysis. Human chorionic gonadotropin (hCG strips (cut-off value of the hCG commercial product is 25 mIU/mL were the detection target in our study. We used a complementary metal-oxide semiconductor (CMOS sensor to detect the colors of the test line and control line in the specific strips and to reduce the observation errors by the naked eye. To achieve better linearity between the grayscale and the concentration, and to decrease the standard deviation (increase the signal to noise ratio, S/N, the Taguchi method was used to find the optimal parameters for the optical inspection system. The pregnancy test used the principles of the lateral flow immunoassay, and the colors of the test and control line were caused by the gold nanoparticles. Because of the sandwich immunoassay model, the color of the gold nanoparticles in the test line was darkened by increasing the hCG concentration. As the results reveal, the S/N increased from 43.48 dB to 53.38 dB, and the hCG concentration detection increased from 6.25 to 50 mIU/mL with a standard deviation of less than 10%. With the optimal parameters to decrease the detection limit and to increase the linearity determined by the Taguchi method, the optical inspection system can be applied to various commercial rapid tests for the detection of ketamine, troponin I, and fatty acid binding protein (FABP.

  10. Risk-based performance indicators

    International Nuclear Information System (INIS)

    Azarm, M.A.; Boccio, J.L.; Vesely, W.E.; Lofgren, E.

    1987-01-01

    The purpose of risk-based indicators is to monitor plant safety. Safety is measured by monitoring the potential for core melt (core-melt frequency) and the public risk. Targets for these measures can be set consistent with NRC safety goals. In this process, the performance of safety systems, support systems, major components, and initiating events can be monitored using measures such as unavailability, failure or occurrence frequency. The changes in performance measures and their trends are determined from the time behavior of monitored measures by differentiation between stochastical and actual variations. Therefore, degradation, as well as improvement in the plant safety performance, can be determined. The development of risk-based performance indicators will also provide the means to trace a change in the safety measures to specific problem areas which are amenable to root cause analysis and inspection audits. In addition, systematic methods will be developed to identify specific improvement policies using the plant information system for the identified problem areas. The final product of the performance indicator project will be a methodology, and an integrated and validated set of software packages which, if properly interfaced with the logic model software of a plant, can monitor the plant performance as plant information is provided as input

  11. Optimization of thermal waste treatment with the INSPECT system by camera based characteristic values and Fuzzy Control; Optimierung der thermischen Abfallbehandlung mit dem INSPECT-System durch kamerabasierte Kenngroessen und Fuzzy Control

    Energy Technology Data Exchange (ETDEWEB)

    Keller, H.B.; Matthes, J. [Forschungszentrum Karlsruhe GmbH, Eggenstein-Leopoldshafen (Germany). Inst. fuer Angewandte Informatik; Schoenecker, H.; Krakau, T. [ci-Tec GmbH, Karlsruhe (Germany)

    2007-07-01

    The application of modern procedures for control and regulation at industrial procedures requires the knowledge of important process variables which are not measurable on-line. Optical measurements by means of video cameras and infrared cameras enable a non-destructive observation of the combustion process in locally different developments. Thus, process variables can be determined by means of special software of image processing in real time. For grate firings and rotating kilns, INSPECT applications are developed. The characteristics computed thereby directly can be used by means of a Fuzzy control module or by external systems for the optimization of the firing regulation. The enormous potential of the optimization with the INSPECT system impressively is confirmed by the past installations and by the process improvements obtained thereby. The INSPECT system was developed in co-operation with Ci-Tec GmbH (Ratingen, Federal Republic of Germany) and marketed, maintained and further developed by Ci-Tec GmbH.

  12. Optimizing image-based patterned defect inspection through FDTD simulations at multiple ultraviolet wavelengths

    Science.gov (United States)

    Barnes, Bryan M.; Zhou, Hui; Henn, Mark-Alexander; Sohn, Martin Y.; Silver, Richard M.

    2017-06-01

    The sizes of non-negligible defects in the patterning of a semiconductor device continue to decrease as the dimensions for these devices are reduced. These "killer defects" disrupt the performance of the device and must be adequately controlled during manufacturing, and new solutions are required to improve optics-based defect inspection. To this end, our group has reported [Barnes et al., Proc. SPIE 1014516 (2017)] our initial five-wavelength simulation study, evaluating the extensibility of defect inspection by reducing the inspection wavelength from a deep-ultraviolet wavelength to wavelengths in the vacuum ultraviolet and the extreme ultraviolet. In that study, a 47 nm wavelength yielded enhancements in the signal to noise (SNR) by a factor of five compared to longer wavelengths and in the differential intensities by as much as three orders-of-magnitude compared to 13 nm. This paper briefly reviews these recent findings and investigates the possible sources for these disparities between results at 13 nm and 47 nm wavelengths. Our in-house finite-difference time-domain code (FDTD) is tested in both two and three dimensions to determine how computational conditions contributed to the results. A modified geometry and materials stack is presented that offers a second viewpoint of defect detectability as functions of wavelength, polarization, and defect type. Reapplication of the initial SNR-based defect metric again yields no detection of a defect at λ = 13 nm, but additional image preprocessing now enables the computation of the SNR for λ = 13 nm simulated images and has led to a revised defect metric that allows comparisons at all five wavelengths.

  13. Inspection Strategies for Concrete Bridges

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Thoft-Christensen, Palle

    1989-01-01

    In this paper an optimal inspection strategy for concrete bridges based on periodic routine and detailed inspections is presented. The failure mode considered is corrosion of the reinforcement due to chlorides. A simple modelling of the corrosion and of the inspection strategy is presented....... The optimal inspection strategy is determined from an optimization problem, where the design variables are time intervals between detailed inspections and the concrete cover. The strategy is illustrated on a simple structure, namely a reinforced concrete beam....

  14. Key outcomes from risk based assessment of pressure equipment in refineries

    International Nuclear Information System (INIS)

    Firth, D.; Lichti, K.; Hill, T.; Thomas, C.; Widrig, J.; Simmonds, G.; Karstensen, A.

    2012-01-01

    Risk based assessment (RBA) has become the best industry practice for management of pressure equipment reliability. Application of RBA programs significantly reduces risk and gives opportunity to optimize inspection programs and produce long term financial benefits. Quest Integrity Group have implemented risk based inspection programs n a variety of industries including ammonia, methanol, geothermal power, :combined cycle power, gas turbines, gas production facilities and refineries. This paper outlines the semi quantitative RBA procedures that have been followed and lists some of the specific technical outcomes. Advanced inspection and life assessment methods used in support of RBI in refineries ire discussed. Piping in refineries is a key risk issue and it is not uncommon for piping failures to result in major incidents. Specific inspection programs are available to monitor differing damage processes such as flow assisted corrosion, hydrogen damage and corrosion under insulation. During assessment it s often found that numerous pipes have never been inspected especially underground smaller diameter pipes which are frequently considered to be un-piggable using conventional technologies and difficult to inspect. Advanced high accuracy flexible miniaturized ultrasonic intelligent pigging combined with fitness for service assessment such as Invista TM is recommended for inspection of critical pipelines which previously have been un-piggable. The processing of crude oil from a range of sources can result in significant variations in the levels of contaminants such as chlorides and sulfides. Major failures have occurred as a result of very rapid increases in corrosion rates in hydrotreating processes due to rapid changes in chemistry. The outcome of the assessment of plants that have potentially high and variable levels of contaminants often results in a review the process chemistry, how it is monitored and development of a detailed corrosion monitoring program. Fired

  15. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  16. The use of holographic and diffractive optics for optimized machine vision illumination for critical dimension inspection

    Science.gov (United States)

    Lizotte, Todd E.; Ohar, Orest

    2004-02-01

    Illuminators used in machine vision applications typically produce non-uniform illumination onto the targeted surface being observed, causing a variety of problems with machine vision alignment or measurement. In most circumstances the light source is broad spectrum, leading to further problems with image quality when viewed through a CCD camera. Configured with a simple light bulb and a mirrored reflector and/or frosted glass plates, these general illuminators are appropriate for only macro applications. Over the last 5 years newer illuminators have hit the market including circular or rectangular arrays of high intensity light emitting diodes. These diode arrays are used to create monochromatic flood illumination of a surface that is to be inspected. The problem with these illumination techniques is that most of the light does not illuminate the desired areas, but broadly spreads across the surface, or when integrated with diffuser elements, tend to create similar shadowing effects to the broad spectrum light sources. In many cases a user will try to increase the performance of these illuminators by adding several of these assemblies together, increasing the intensity or by moving the illumination source closer or farther from the surface being inspected. In this case these non-uniform techniques can lead to machine vision errors, where the computer machine vision may read false information, such as interpreting non-uniform lighting or shadowing effects as defects. This paper will cover a technique involving the use of holographic / diffractive hybrid optical elements that are integrated into standard and customized light sources used in the machine vision industry. The bulk of the paper will describe the function and fabrication of the holographic/diffractive optics and how they can be tailored to improve illuminator design. Further information will be provided a specific design and examples of it in operation will be disclosed.

  17. Optimization of the fractionated irradiation scheme considering physical doses to tumor and organ at risk based on dose–volume histograms

    Energy Technology Data Exchange (ETDEWEB)

    Sugano, Yasutaka [Graduate School of Health Sciences, Hokkaido University, Kita-12, Nishi-5, Kita-ku, Sapporo, Hokkaido 060-0812 (Japan); Mizuta, Masahiro [Laboratory of Advanced Data Science, Information Initiative Center, Hokkaido University, Kita-11, Nishi-5, Kita-ku, Sapporo, Hokkaido 060-0811 (Japan); Takao, Seishin; Shirato, Hiroki; Sutherland, Kenneth L. [Department of Radiation Medicine, Graduate School of Medicine, Hokkaido University, Kita-15, Nishi-5, Kita-ku, Sapporo, Hokkaido 060-8638 (Japan); Date, Hiroyuki, E-mail: date@hs.hokudai.ac.jp [Faculty of Health Sciences, Hokkaido University, Kita-12, Nishi-5, Kita-ku, Sapporo, Hokkaido 060-0812 (Japan)

    2015-11-15

    Purpose: Radiotherapy of solid tumors has been performed with various fractionation regimens such as multi- and hypofractionations. However, the ability to optimize the fractionation regimen considering the physical dose distribution remains insufficient. This study aims to optimize the fractionation regimen, in which the authors propose a graphical method for selecting the optimal number of fractions (n) and dose per fraction (d) based on dose–volume histograms for tumor and normal tissues of organs around the tumor. Methods: Modified linear-quadratic models were employed to estimate the radiation effects on the tumor and an organ at risk (OAR), where the repopulation of the tumor cells and the linearity of the dose-response curve in the high dose range of the surviving fraction were considered. The minimization problem for the damage effect on the OAR was solved under the constraint that the radiation effect on the tumor is fixed by a graphical method. Here, the damage effect on the OAR was estimated based on the dose–volume histogram. Results: It was found that the optimization of fractionation scheme incorporating the dose–volume histogram is possible by employing appropriate cell surviving models. The graphical method considering the repopulation of tumor cells and a rectilinear response in the high dose range enables them to derive the optimal number of fractions and dose per fraction. For example, in the treatment of prostate cancer, the optimal fractionation was suggested to lie in the range of 8–32 fractions with a daily dose of 2.2–6.3 Gy. Conclusions: It is possible to optimize the number of fractions and dose per fraction based on the physical dose distribution (i.e., dose–volume histogram) by the graphical method considering the effects on tumor and OARs around the tumor. This method may stipulate a new guideline to optimize the fractionation regimen for physics-guided fractionation.

  18. Risk-based safety indicators

    International Nuclear Information System (INIS)

    Szikszai, T.

    1997-01-01

    The presentation discusses the following issues: The objectives of the risk-based indicator programme. The characteristics of the risk-based indicators. The objectives of risk-based safety indicators - in monitoring safety; in PSA applications. What indicators? How to produce the risk based indicators? PSA requirements

  19. Improving the performance of the actinic inspection tool with an optimized alignment procedure

    International Nuclear Information System (INIS)

    Mochi, I.; Goldberg, K.A.; Naulleau, P.; Huh, Sungmin

    2009-01-01

    Extreme ultraviolet (EUV) microscopy is an important tool for the investigation of the performance of EUV masks, for detecting the presence and the characteristics of defects, and for evaluating the effectiveness of defect repair techniques. Aerial image measurement bypasses the difficulties inherent to photoresist imaging and enables high data collection speed and flexibility. It provides reliable and quick feedback for the development of masks and lithography system modeling methods. We operate the SEMATECH Berkeley Actinic Inspection Tool (AIT), a EUV microscope installed at the Advanced Light Source at Lawrence Berkeley National Laboratory. The AIT is equipped with several high-magnification Fresnel zoneplate lenses, with various numerical aperture values, that enable it image the reflective mask surface with various resolution and magnification settings. Although the AIT has undergone significant recent improvements in terms of imaging resolution and illumination uniformity, there is still room for improvement. In the AIT, an off-axis zoneplate lens collects the light coming from the sample and an image of the sample is projected onto an EUV-sensitive CCD camera. The simplicity of the optical system is particularly helpful considering that the AIT alignment has to be performed every time that a sample or a zoneplate is replaced. The alignment is sensitive to several parameters such as the lens position and orientation, the illumination direction and the sample characteristics. Since the AIT works in high vacuum, there is no direct access to the optics or to the sample during the alignment and the measurements. For all these reasons the alignment procedures and feedback can be complex, and in some cases can reduce the overall data throughput of the system. In this paper we review the main strategies and procedures that have been developed for quick and reliable alignments, and we describe the performance improvements we have achieved, in terms of aberration

  20. Improving the performance of the actinic inspection tool with an optimized alignment procedure

    Energy Technology Data Exchange (ETDEWEB)

    Mochi, I.; Goldberg, K.A.; Naulleau, P.; Huh, Sungmin

    2009-03-04

    Extreme ultraviolet (EUV) microscopy is an important tool for the investigation of the performance of EUV masks, for detecting the presence and the characteristics of defects, and for evaluating the effectiveness of defect repair techniques. Aerial image measurement bypasses the difficulties inherent to photoresist imaging and enables high data collection speed and flexibility. It provides reliable and quick feedback for the development of masks and lithography system modeling methods. We operate the SEMATECH Berkeley Actinic Inspection Tool (AIT), a EUV microscope installed at the Advanced Light Source at Lawrence Berkeley National Laboratory. The AIT is equipped with several high-magnification Fresnel zoneplate lenses, with various numerical aperture values, that enable it image the reflective mask surface with various resolution and magnification settings. Although the AIT has undergone significant recent improvements in terms of imaging resolution and illumination uniformity, there is still room for improvement. In the AIT, an off-axis zoneplate lens collects the light coming from the sample and an image of the sample is projected onto an EUV-sensitive CCD camera. The simplicity of the optical system is particularly helpful considering that the AIT alignment has to be performed every time that a sample or a zoneplate is replaced. The alignment is sensitive to several parameters such as the lens position and orientation, the illumination direction and the sample characteristics. Since the AIT works in high vacuum, there is no direct access to the optics or to the sample during the alignment and the measurements. For all these reasons the alignment procedures and feedback can be complex, and in some cases can reduce the overall data throughput of the system. In this paper we review the main strategies and procedures that have been developed for quick and reliable alignments, and we describe the performance improvements we have achieved, in terms of aberration

  1. Optimal organization of structural analysis and site inspection for the seismic requalification of Paks NPP

    International Nuclear Information System (INIS)

    Contri, P.

    1996-01-01

    The analysis described in this report deals with a numerical procedure aimed for the assessment of a methodology for the optimal organization of data collection, in the context of seismic requalification of structures and components of existing nuclear power plants. The presented procedure has quite a general application and an example was chosen for the Paks NPP where seismic requalification is in progress. The assessment was carried out in reference to the following main tasks: structure and soil data analysis; numerical model generation; deterministic dynamic analysis description; reliability analysis framework discussion; transfer function calculation via response surface approach; and the sensitivity evaluation

  2. Sensitivity and optimization of artificial digestion in the inspection of meat for Trichinella spiralis.

    Science.gov (United States)

    Li, Feng; Cui, Jing; Wang, Zhong-Quan; Jiang, Peng

    2010-08-01

    In many countries, the method of choice in inspecting meat for Trichinella spiralis infection is artificial digestion. We conducted a study of the sensitivity of the artificial digestion method recommended by the International Commission on Trichinellosis for detecting T. spiralis larvae in meat and of the effect of modifications of some procedures used in the method on its sensitivity. As part of this, we evaluated the effects on larval recovery of the vessels used for larval settling, sieve sizes, and temperatures at which larvae passed through the sieves, using larvae from T. spiralis-infected mice. We observed the effects on larval recovery of digestion duration and of modified artificial digestion by using 10-g samples of infected mouse muscle alone or mixed with uninfected pork. The percentages of larvae recovered with the respective use of separatory funnels and conical cylinders were 51.20% and 98.70%. The rates of recovery of T. spiralis larvae at 4 degrees C after passage through sieves of 425-microm mesh (No. 40), 250-microm mesh (No. 60), and 180-microm mesh (No. 80) were 98.42%, 90.59%, and 81.63%, which exceeded the 97.79%, 85.10%, and 61.12% rates of recovery of motile larvae at 40 degrees C and the 95.12%, 78.60%, and 44.16% rates of recovery of dead larvae at 90 degrees C. The larval recovery rate after digestion for 2 hours (96.18%) was greater than that after 0.5 hours (88.00%). We then examined a modified digestion method in which 10-g samples of pork mixed with 300 mL of digestive solution were digested for 2 hours at 43 degrees C followed by chilling of digest solution to 4 degrees C before passing it through a 425-microm mesh (No. 40) sieve and allowing it to settle in a 1-L conical cylinder. With this procedure, the modified method detected T. spiralis in samples of pork meat weighing 10 g and containing either 1 larva per gram or 0.1 larva per gram. Further validation of digestion method incorporating these modifications is required with

  3. From PISC to risk informed inspection

    International Nuclear Information System (INIS)

    Crutzen, S.; Lemaitre, P.; Fabbri, L.

    1998-01-01

    In this paper the correlation between inspection effectiveness, inspection qualification and risk informed inspection will be treated in view of harmonisation of inspection of nuclear plant components. Through the different phases of the PISC programme the necessity has been demonstrated to show the effectiveness of the inspection through a formal process of qualification in order to ensure that a certain level of effectiveness has been reached. Inspection qualification is indeed the way to quantify the capability level of inspection techniques used. The targets to be met by the inspection is information which should be obtained from risk based analyses. (author)

  4. A Novel Hybridization of Applied Mathematical, Operations Research and Risk-based Methods to Achieve an Optimal Solution to a Challenging Subsurface Contamination Problem

    Science.gov (United States)

    Johnson, K. D.; Pinder, G. F.

    2013-12-01

    The objective of the project is the creation of a new, computationally based, approach to the collection, evaluation and use of data for the purpose of determining optimal strategies for investment in the solution of remediation of contaminant source areas and similar environmental problems. The research focuses on the use of existing mathematical tools assembled in a unique fashion. The area of application of this new capability is optimal (least-cost) groundwater contamination source identification; we wish to identify the physical environments wherein it may be cost-prohibitive to identify a contaminant source, the optimal strategy to protect the environment from additional insult and formulate strategies for cost-effective environmental restoration. The computational underpinnings of the proposed approach encompass the integration into a unique of several known applied-mathematical tools. The resulting tool integration achieves the following: 1) simulate groundwater flow and contaminant transport under uncertainty, that is when the physical parameters such as hydraulic conductivity are known to be described by a random field; 2) define such a random field from available field data or be able to provide insight into the sampling strategy needed to create such a field; 3) incorporate subjective information, such as the opinions of experts on the importance of factors such as locations of waste landfills; 4) optimize a search strategy for finding a potential source location and to optimally combine field information with model results to provide the best possible representation of the mean contaminant field and its geostatistics. Our approach combines in a symbiotic manner methodologies found in numerical simulation, random field analysis, Kalman filtering, fuzzy set theory and search theory. Testing the algorithm for this stage of the work, we will focus on fabricated field situations wherein we can a priori specify the degree of uncertainty associated with the

  5. Cost tradeoffs in consequence management at nuclear power plants: A risk based approach to setting optimal long-term interdiction limits for regulatory analyses

    International Nuclear Information System (INIS)

    Mubayi, V.

    1995-05-01

    The consequences of severe accidents at nuclear power plants can be limited by various protective actions, including emergency responses and long-term measures, to reduce exposures of affected populations. Each of these protective actions involve costs to society. The costs of the long-term protective actions depend on the criterion adopted for the allowable level of long-term exposure. This criterion, called the ''long term interdiction limit,'' is expressed in terms of the projected dose to an individual over a certain time period from the long-term exposure pathways. The two measures of offsite consequences, latent cancers and costs, are inversely related and the choice of an interdiction limit is, in effect, a trade-off between these two measures. By monetizing the health effects (through ascribing a monetary value to life lost), the costs of the two consequence measures vary with the interdiction limit, the health effect costs increasing as the limit is relaxed and the protective action costs decreasing. The minimum of the total cost curve can be used to calculate an optimal long term interdiction limit. The calculation of such an optimal limit is presented for each of five US nuclear power plants which were analyzed for severe accident risk in the NUREG-1150 program by the Nuclear Regulatory Commission

  6. Simulating the service life performance of an inspected group of jacket-type structures

    DEFF Research Database (Denmark)

    Schneider, Ronald; Thöns, Sebastian; Rogge, Andreas

    2017-01-01

    and risk. We intend to adopt this approach to optimize inspection, monitoring and repair activities for offshore wind park support structures. As a first step, we simulate – in analogy to an offshore wind park – the service life performance of an inspected group of jacket-type frames. The performance......A novel method for risk-based optimization of inspection and repair strategies for deteriorating structural systems has recently been proposed. The method defines heuristics at the system level to reduce the number of possible strategies. For each defined strategy, it computes the updated system...... failure probability conditional on simulated inspection and repair histories, and evaluates the associated costs and risk. The expected total service life costs and risk for a strategy are finally determined using Monte Carlo simulation. The optimal strategy minimizes the expected total service life costs...

  7. Health products inspection

    International Nuclear Information System (INIS)

    Stoltz, M.

    2009-01-01

    To protect public health, the Health Products Inspection is a public service mission where the application of regulations concerning activities on human health products and cosmetic products is verified. This mission permits a global approach to assess the health products risk-based benefit and, in monitoring by laboratory testing and by on site inspections, to verify their compliance with appropriate regulations. The seventy five inspectors perform about eight hundred inspections per year, in France and abroad. These inspections are related to data provided in the health products assessment and also to manufacturing and delivery practices. The French inspection body is also involved in the training of foreign inspectors and in the harmonization of national, European and international practices either for operators than for the competent authorities. (author)

  8. Development of new risk based regulations

    International Nuclear Information System (INIS)

    Nielsen, L.

    1999-01-01

    A short presentation of the oil and gas industry in Norway, and a brief overview of the regulatory regime in the petroleum sector in Norway is given. Risk analysis has been performed in Norway since 1981 and the various applications will be described. These risk analyses are quite different from a nuclear PSA and some of these differences will be commented. Risk based optimisation techniques such as RCM (Reliability Centred Maintenance) and Risk Based Inspection is used in the industry, with very limited support from the risk analysis. Some of the limitation that exist when such techniques are imported from other industries will be commented on. NPD (Norwegian Petroleum Directorate) is revising our regulations and some of the future plants when it comes to risk informed regulatory requirements will be presented. (au)

  9. Selection of procedures for inservice inspections; Auswahl der Verfahren fuer wiederkehrende Pruefungen

    Energy Technology Data Exchange (ETDEWEB)

    Brast, G [Preussische Elektrizitaets-AG (Preussenelektra), Hannover (Germany); Britz, A [Bayernwerk AG, Muenchen (Germany); Maier, H J [Stuttgart Univ. (Germany). Staatliche Materialpruefungsanstalt; Seidenkranz, T [TUEV Energie- und Systemtechnik GmbH, Mannheim (Germany)

    1998-11-01

    At present, selection of procedures for inservice inspection has to take into account the legal basis, i.e. the existing regulatory codes, and the practical aspects, i.e. experience and information obtained by the general, initial inservice inspection or performance data obtained by the latest, recurrent inspection. However, regulatory codes are being reviewed to a certain extent in order to permit integration of technological progress. Depending on the degree of availability in future, of inspection task-specific, sensitive and qualified NDE techniques for inservice inspections (`risk based ISI`), the framework of defined inspection intervals, sites, and detection limits will be broken up and altered in response to progress made. This opens up new opportunities for an optimization of inservice inspections for proof of component integrity. (orig./CB) [Deutsch] Zur Zeit muss sich die Auswahl der Pruefverfahren an den gueltigen Regelwerken und, da es sich um wiederkehrende Pruefungen handelt, an der Basispruefung bzw. der letzten wiederkehrenden Pruefung orientieren. Jedoch vollzieht sich zur Zeit eine Oeffnung der Regelwerke, mit der man auch der Weiterentwicklung der Prueftechniken Rechnung traegt. In dem Masse, wie zukuenftig auf die Pruefaufgabe/Pruefaussage optimal abgestimmte und qualifizierte Prueftechniken mit einer hohen Nachweisempfindlichkeit am Bauteil fuer zielgerichtete wiederkehrende Pruefungen (als `risk based ISI`) zur Verfuegung stehen, wird der Rahmen mit festgelegten Pruefintervallen, Prueforten und festen Registriergrenzen gesprengt und variabel gestaltet werden koennen. Damit ergeben sich neue Moeglichkeiten fuer eine Optimierung der WKP zum Nachweis der Integritaet des Bauteils. (orig./MM)

  10. Risk-based configuration control

    International Nuclear Information System (INIS)

    Szikszai, T.

    1997-01-01

    The presentation discusses the following issues: The Configuration Control; The Risk-based Configuration Control (during power operation mode, and during shutdown mode). PSA requirements. Use of Risk-based Configuration Control System. Configuration Management (basic elements, benefits, information requirements)

  11. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  12. Advanced inspection technology for non intrusive inspection (NII) program

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud

    2003-01-01

    In the current economic environment, plants and facilities are under pressure to introduced cost saving as well as profit maximising measures. Among the many changes in the way things are run is a move towards Risk Based Inspection (RBI), with an emphasis on longer operating periods between shutdowns as well as to utilise components to their maximum capability. Underpinning and RBI program requires good data from an effective online inspections program, which would not require the shutdown of critical components. One methodology of online inspection is known as Non Intrusive Inspection (NII), an inspection philosophy with the objective of replacing internal inspection of a vessel by doing Non Destructive Testing (NDT) and inspections externally. To this end, a variety of advanced NDT techniques are needed to provide accurate online measurements. (Author)

  13. Risk-Based Educational Accountability in Dutch Primary Education

    Science.gov (United States)

    Timmermans, A. C.; de Wolf, I. F.; Bosker, R. J.; Doolaard, S.

    2015-01-01

    A recent development in educational accountability is a risk-based approach, in which intensity and frequency of school inspections vary across schools to make educational accountability more efficient and effective by enabling inspectorates to focus on organizations at risk. Characteristics relevant in predicting which schools are "at risk…

  14. Optimal organization of structural analysis and site inspection for the seismic requalification of the nuclear power plant of Paks, Hungary

    International Nuclear Information System (INIS)

    Fregonese, R.

    1995-01-01

    The analysis described in this report deals with a numerical procedure aimed at the assessment of a methodology for the optimal organization of data collection, in a contest of seismic requalification of structures and components of existing nuclear power stations (NPPs). The activity has been carried out in the frame of IAEA benchmark study for the seismic analysis of existing Nuclear Power Plants. This study starts from the assumption that seismic qualification of existing NPPs usually has to be carried out even in lack of sufficient data on structural behaviour and site conditions. In this framework, the organization of the analysis possibly requires a special approach, based on reliability analysis, able to give the distributions of dependent structural variables. This result can in fact be used in iterative updating of the analysis, leading at last at a required uncertainty target level for the structural evaluation. Therefore, the global uncertainty can be reduced by the reduction of the uncertainties of the variables that affect most the structural behaviour: the proposed procedure is able to drive this process in an optimal way. The analysis manager can therefore organize additional experimental inspections (for example in geotechnics, geophysics, structural behaviour)and data collections with the confidence of a minimum effort required for the prescribed target in terms of seismic safety. The procedure presented in this report has quite a general application following the general description is provided; therefore the example test has been chosen for the Paks NPP in Hungary, where a seismic requalification is in progress. To this aim, in the following specific reference will be made to the variables of interest for the on going job, namely: the probability distribution of some structural parameters, such as acceleration or shear force in critical points, giving a global overview on the reliability of structural calculations; the sensitivity coefficient

  15. Management of Microbiologically Influenced Corrosion in Risk Based Inspection analysis

    DEFF Research Database (Denmark)

    Skovhus, Torben Lund; Hillier, Elizabeth; Andersen, Erlend S.

    . Microbiologically Influenced Corrosion (MIC) is a degradation mechanism that has received increased attention from corrosion engineers and asset operators in the past decades. In this paper, the most recent models that have been developed in order to assess the impact of MIC on asset integrity will be presented...... and an extensive up-to date literature study. The parameters are discussed and subsequently combined in a novel procedure that allows assessment of MIC in a RBI analysis. The procedure is sub-divided into one screening step and a detailed assessment, which fits the recommended approach to assess risk in a RBI...

  16. Risk-based Inspection Planning Optimisation of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramirez, José Rangel; Sørensen, John Dalsgaard

    2011-01-01

    Wind industry is substantially propelled and the future scenarios designate offshore locations as important sites for energy production. With this development, offshore wind farms represent a feasible option to accomplish the needed energy, bringing with it technical and economical challenges......, but considering the lower reliability level for wind turbines. This framework is addressing fatigue prone details in welded steel joints typically located in the wind turbine substructure. The increase of turbulence in-wind farms (IWF) due to wake effects is taken into account using a code-based turbulence model...

  17. Risk based maintenance to increase safety and decrease costs

    International Nuclear Information System (INIS)

    Phillips, J.H.

    2000-01-01

    Risk-Based techniques have been developed for commercial nuclear power plants for the last eight years by a team working through the ASME Center for Research and Technology Development (CRTD). System boundaries and success criteria is defined using the Probabilistic Risk Analysis or Probabilistic Safety Analysis developed to meet the Individual Plant Evaluation. Final ranking of components is by a plant expert panel similar to the one developed for the Maintenance Rule. Components are identified as being high risk-significant or low risk-significant. Maintenance and resources are focused on those components that have the highest risk-significance. The techniques have been developed and applied at a number of plants. Results from the first risk-based inspection pilot plant indicates safety due to pipe failure can be doubled while the inspection reduced to about 80% when compared with current inspection programs. Pilot studies on risk-based testing indicate that about 60% of pumps and 25 to 30% of valves in plants are high safety-significant The reduction in inspection and testing reduces the person-rem exposure and resulting in further increases in safety. These techniques have been documented in publications by the ASME CRTD which are referenced. (author)

  18. Risk-based safety indicators

    International Nuclear Information System (INIS)

    Sedlak, J.

    2001-12-01

    The report is structured as follows: 1. Risk-based safety indicators: Typology of risk-based indicators (RBIs); Tools for defining RBIs; Requirements for the PSA model; Data sources for RBIs; Types of risks monitored; RBIs and operational safety indicators; Feedback from operating experience; PSO model modification for RBIs; RBI categorization; RBI assessment; RBI applications; Suitable RBI applications. 2. Proposal for risk-based indicators: Acquiring information from operational experience; Method of acquiring safety relevance coefficients for the systems from a PSA model; Indicator definitions; On-line indicators. 3. Annex: Application of RBIs worldwide. (P.A.)

  19. An Aerial Robot for Rice Farm Quality Inspection With Type-2 Fuzzy Neural Networks Tuned by Particle Swarm Optimization-Sliding Mode Control Hybrid Algorithm

    DEFF Research Database (Denmark)

    Camci, Efe; Kripalan, Devesh Raju; Ma, Linlu

    2017-01-01

    , an autonomous quality inspection over rice farms is proposed by employing quadcopters. Real-time control of these vehicles, however, is still challenging as they exhibit highly nonlinear behavior especially for agile maneuvers. What is more, these vehicles have to operate under uncertain working conditions...... particle swarm optimization-sliding mode control (PSO-SMC) theory-based hybrid algorithm is proposed for the training of T2-FNNs. In particular, continuous version of PSO is adopted for the identification of the antecedent part of T2-FNNs while SMCbased update rules are utilized for online learning...

  20. Optimizing in-bay fuel inspection capability to meet the needs of today's CANDU fleet

    International Nuclear Information System (INIS)

    St-Pierre, J.; Simons, B.

    2013-01-01

    With the recent return to service of many CANDU units, aging of all others, increasingly competitive energy market and aging hot cell infrastructure - there exists now a greater need for timely, cost-effective and reliable collection of irradiated fuel performance information from fuel bay inspections. The recent development of simple in-bay tools, used in combination with standardized technical specifications, inspection databases and assessment techniques, allows utilities to characterize the condition of irradiated fuel and any debris lodged in the bundle in a more timely fashion and more economically than ever. Use of these tools and 'advanced' techniques permits timely engineering review and disposition of emerging issues to support reliable operation of the CANDU fleet. (author)

  1. Optimizing in-bay fuel inspection capability to meet the needs of today's CANDU fleet

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, J., E-mail: joe.st-pierre@amec.com [AMEC NSS, Toronto, Ontario (Canada); Simons, B. [Stern Laboratories Incorporated, Hamilton, Ontario (Canada)

    2013-07-01

    With the recent return to service of many CANDU units, aging of all others, increasingly competitive energy market and aging hot cell infrastructure - there exists now a greater need for timely, cost-effective and reliable collection of irradiated fuel performance information from fuel bay inspections. The recent development of simple in-bay tools, used in combination with standardized technical specifications, inspection databases and assessment techniques, allows utilities to characterize the condition of irradiated fuel and any debris lodged in the bundle in a more timely fashion and more economically than ever. Use of these tools and 'advanced' techniques permits timely engineering review and disposition of emerging issues to support reliable operation of the CANDU fleet. (author)

  2. Multiobjective optimization of the inspection intervals of a nuclear safety system: A clustering-based framework for reducing the Pareto Front

    International Nuclear Information System (INIS)

    Zio, E.; Bazzo, R.

    2010-01-01

    In this paper, a framework is developed for identifying a limited number of representative solutions of a multiobjective optimization problem concerning the inspection intervals of the components of a safety system of a nuclear power plant. Pareto Front solutions are first clustered into 'families', which are then synthetically represented by a 'head of the family' solution. Three clustering methods are analyzed. Level Diagrams are then used to represent, analyse and interpret the Pareto Fronts reduced to their head-of-the-family solutions. Two decision situations are considered: without or with decision maker preferences, the latter implying the introduction of a scoring system to rank the solutions with respect to the different objectives: a fuzzy preference assignment is then employed to this purpose. The results of the application of the framework of analysis to the problem of optimizing the inspection intervals of a nuclear power plant safety system show that the clustering-based reduction maintains the Pareto Front shape and relevant characteristics, while making it easier for the decision maker to select the final solution.

  3. Inspection Database

    Data.gov (United States)

    U.S. Department of Health & Human Services — FDA is disclosing the final inspection classification for inspections related to currently marketed FDA-regulated products. The disclosure of this information is not...

  4. Risk-based decisionmaking (Panel)

    Energy Technology Data Exchange (ETDEWEB)

    Smith, T.H.

    1995-12-31

    By means of a panel discussion and extensive audience interaction, explore the current challenges and progress to date in applying risk considerations to decisionmaking related to low-level waste. This topic is especially timely because of the proposed legislation pertaining to risk-based decisionmaking and because of the increased emphasis placed on radiological performance assessments of low-level waste disposal.

  5. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  6. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  7. Inspection vehicle

    International Nuclear Information System (INIS)

    Takahashi, Masaki; Omote, Tatsuyuki; Yoneya, Yutaka; Tanaka, Keiji; Waki, Tetsuro; Yoshida, Tomiji; Kido, Tsuyoshi.

    1993-01-01

    An inspection vehicle comprises a small-sized battery directly connected with a power motor or a direct power source from trolly lines and a switching circuit operated by external signals. The switch judges advance or retreat by two kinds of signals and the inspection vehicle is recovered by self-running. In order to recover the abnormally stopped inspection vehicle to the targeted place, the inspection vehicle is made in a free-running state by using a clutch mechanism and is pushed by an other vehicle. (T.M.)

  8. Bridging of inspection with corrosion management

    International Nuclear Information System (INIS)

    Zamaluddin Ali; Mohd Hawari Hassan; Rohana Jaafar

    2009-01-01

    Formerly, Inspection and Corrosion Engineers have less interaction and sharing of information to each other even they are working in the same plant or organization. Inspection finding either from visual inspection or NDT techniques rarely shared with corrosion engineers. Similarly corrosion engineers rarely discussed their corrosion prediction and potential damage mechanism with inspection engineers. A demanding request of more holistic plant safety and asset integrity promoted the introduction and implementation of Risk Based Inspection (RBI). RBI analysis demands the input mainly from both disciplines i.e. Inspection and Corrosion Engineers. Most of RBI methodologies are once-off analysis approach which also promoted once-off interaction between Inspection and Corrosion Engineers. PETRONAS has developed a methodology with supporting software, integrating both Inspection and Corrosion disciplines. PETRONAS Risk Based Inspection (PRBI) is intended to promote continuous integration of Inspection and Corrosion management of the plant through out the whole life cycle starting from the design stage to fabrication, operation and decommissions stage. (author)

  9. Risk-based and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, K.; Nagai, S.; Akikuni, Y.; Fujiwara, T.; Furuya, K.; Matsumoto, S.; Takagi, K.; Kawabata, T.

    2003-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants. (orig.)

  10. A risk-based sensor placement methodology

    International Nuclear Information System (INIS)

    Lee, Ronald W.; Kulesz, James J.

    2008-01-01

    A risk-based sensor placement methodology is proposed to solve the problem of optimal location of sensors to protect population against the exposure to, and effects of, known and/or postulated chemical, biological, and/or radiological threats. Risk is calculated as a quantitative value representing population at risk from exposure at standard exposure levels. Historical meteorological data are used to characterize weather conditions as the frequency of wind speed and direction pairs. The meteorological data drive atmospheric transport and dispersion modeling of the threats, the results of which are used to calculate risk values. Sensor locations are determined via an iterative dynamic programming algorithm whereby threats detected by sensors placed in prior iterations are removed from consideration in subsequent iterations. In addition to the risk-based placement algorithm, the proposed methodology provides a quantification of the marginal utility of each additional sensor. This is the fraction of the total risk accounted for by placement of the sensor. Thus, the criteria for halting the iterative process can be the number of sensors available, a threshold marginal utility value, and/or a minimum cumulative utility achieved with all sensors

  11. Information-Driven Inspections

    International Nuclear Information System (INIS)

    Laughter, Mark D.; Whitaker, J. Michael; Lockwood, Dunbar

    2010-01-01

    New uranium enrichment capacity is being built worldwide in response to perceived shortfalls in future supply. To meet increasing safeguards responsibilities with limited resources, the nonproliferation community is exploring next-generation concepts to increase the effectiveness and efficiency of safeguards, such as advanced technologies to enable unattended monitoring of nuclear material. These include attribute measurement technologies, data authentication tools, and transmission and security methods. However, there are several conceptual issues with how such data would be used to improve the ability of a safeguards inspectorate such as the International Atomic Energy Agency (IAEA) to reach better safeguards conclusions regarding the activities of a State. The IAEA is pursuing the implementation of information-driven safeguards, whereby all available sources of information are used to make the application of safeguards more effective and efficient. Data from continuous, unattended monitoring systems can be used to optimize on-site inspection scheduling and activities at declared facilities, resulting in fewer, better inspections. Such information-driven inspections are the logical evolution of inspection planning - making use of all available information to enhance scheduled and randomized inspections. Data collection and analysis approaches for unattended monitoring systems can be designed to protect sensitive information while enabling information-driven inspections. A number of such inspections within a predetermined range could reduce inspection frequency while providing an equal or greater level of deterrence against illicit activity, all while meeting operator and technology holder requirements and reducing inspector and operator burden. Three options for using unattended monitoring data to determine an information-driven inspection schedule are to (1) send all unattended monitoring data off-site, which will require advances in data analysis techniques to

  12. Ultrasonic inspection

    International Nuclear Information System (INIS)

    Satittada, Gannaga

    1984-01-01

    Ultrasonic inspection is one of the most widely used methods for nondestructive inspection. The beam of high-frequency sound wave, ultrasonic wave, is introduced into the material. It travels through the material with some attendant loss of energy and can be reflected at interfaces. The reflected beam is detected and analyzed. Ultrasonic inspection is used to detect flaws in metal parts as well as in welded, brazed and bonded joints during research work and developing production and service. It is also used to detect and locate porosity, pipe, and flakes. In addition, it can be used for the measurement of metal thickness. Ultrasonic inspection is therefore used for quality control and material inspection in all major industries

  13. Efficient and reliable inspection through the use of optimised NDT

    International Nuclear Information System (INIS)

    Highmore, P.J.

    1993-01-01

    Current activities within AEA Technology are described aiming at the constitution of an optimized and reliable inspection technology for the UK nuclear programme. Three main factors, i.e. optimized inspection design, efficient inspection reliability assessment and effective inspector training, influencing the efficiency and reliability of the on-site inspection are discussed. (Z.S.)

  14. Game Theory and Risk-Based Levee System Design

    Science.gov (United States)

    Hui, R.; Lund, J. R.; Madani, K.

    2014-12-01

    Risk-based analysis has been developed for optimal levee design for economic efficiency. Along many rivers, two levees on opposite riverbanks act as a simple levee system. Being rational and self-interested, land owners on each river bank would tend to independently optimize their levees with risk-based analysis, resulting in a Pareto-inefficient levee system design from the social planner's perspective. Game theory is applied in this study to analyze decision making process in a simple levee system in which the land owners on each river bank develop their design strategies using risk-based economic optimization. For each land owner, the annual expected total cost includes expected annual damage cost and annualized construction cost. The non-cooperative Nash equilibrium is identified and compared to the social planner's optimal distribution of flood risk and damage cost throughout the system which results in the minimum total flood cost for the system. The social planner's optimal solution is not feasible without appropriate level of compensation for the transferred flood risk to guarantee and improve conditions for all parties. Therefore, cooperative game theory is then employed to develop an economically optimal design that can be implemented in practice. By examining the game in the reversible and irreversible decision making modes, the cost of decision making myopia is calculated to underline the significance of considering the externalities and evolution path of dynamic water resource problems for optimal decision making.

  15. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  16. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2009-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based lifecycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue, corrosion...

  17. Hospital Inspections

    Data.gov (United States)

    U.S. Department of Health & Human Services — Welcome to hospitalinspections.org, a website run by the Association of Health Care Journalists (AHCJ) that aims to make federal hospital inspection reports easier...

  18. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    to oil and gas structures. In addition, condition monitoring systems are often available, and the information should be taken into account when making decisions. In this thesis, methods for risk-based maintenance planning using Bayesian methods are investigated, with the aim of making optimal decisions......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... considering all available information. First, a theoretical damage model is formulated, the model is then updated using condition monitoring data, and the updated model is used as basis for risk-based decision making. Several approaches for solving the decision problems have been considered: various types...

  19. Risk based seismic design criteria

    International Nuclear Information System (INIS)

    Kennedy, R.P.

    1999-01-01

    In order to develop a risk based seismic design criteria the following four issues must be addressed: (1) What target annual probability of seismic induced unacceptable performance is acceptable? (2) What minimum seismic margin is acceptable? (3) Given the decisions made under Issues 1 and 2, at what annual frequency of exceedance should the safe-shutdown-earthquake (SSE) ground motion be defined? (4) What seismic design criteria should be established to reasonably achieve the seismic margin defined under Issue 2? The first issue is purely a policy decision and is not addressed in this paper. Each of the other three issues are addressed. Issues 2 and 3 are integrally tied together so that a very large number of possible combinations of responses to these two issues can be used to achieve the target goal defined under Issue 1. Section 2 lays out a combined approach to these two issues and presents three potentially attractive combined resolutions of these two issues which reasonably achieves the target goal. The remainder of the paper discusses an approach which can be used to develop seismic design criteria aimed at achieving the desired seismic margin defined in resolution of Issue 2. Suggestions for revising existing seismic design criteria to more consistently achieve the desired seismic margin are presented. (orig.)

  20. RBI Optimization of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    methods for oil & gas installations, a framework for optimal inspection and maintenance planning of offshore wind turbines is presented. Special aspects for offshore wind turbines considered are the fatigue loading characteristics where usually the wind loading are dominating the wave loading, wake......Wind turbines for electricity production have increased significantly the last years both in production capability and size. This development is expected to continue also in the coming years. Offshore wind turbines with an electricity production of 5-10 MW are planned. Typically, the wind turbine...... support structure is a steel structure consisting of a tower and a monopile, tripod or jacket type foundation. This paper considers aspects of inspection and maintenance planning of fatigue prone details in jacket and tripod type of wind turbine support structures. Based on risk-based inspection planning...

  1. Operational inspections

    International Nuclear Information System (INIS)

    Bystersky, M.

    1997-01-01

    Special equipment is described, designed for inspection of reactor pressure vessels performed from the inside. Central shaft manipulator ZMM-5 is available for crack detection control using ultrasound and eddy currents, for visual check of surfaces, repair works at the reactor pressure vessel, and hardness measurements. The manipulator consists of the manipulator bridge, a cable container, shaft segments, a control mechanism and auxiliary parts. Eight inspections were performed at the Bohunice nuclear power plant and two at the Paks nuclear power plant. (M.D.)

  2. Risk-based regulation: Challenges and opportunities

    International Nuclear Information System (INIS)

    Bari, R.A.

    1995-01-01

    Over the last twenty years, man has witnessed a gradual but steady movement toward increased usage of risk-based methods and results in the regulatory process. The ''risk perspective'' as a supportive view to existing (non-risk-based or deterministic) information used in decision making has a firm foothold now in most countries that regulate nuclear power. Furthermore, in the areas outside the nuclear power field, such as health risk assessment, risk-based information is used increasingly to make decisions on potential impacts of chemical, biological, and radiological exposures. Some of the principal concepts and issues that are pertinent to risk-based regulation are reviewed. There is a growing interest in most countries in the use of risk-based methods and results to facilitate decision-making associated with regulatory processes. A summary is presented of the challenges and opportunities related to expanded use of risk-based regulation

  3. Risk based surveillance for vector borne diseases

    DEFF Research Database (Denmark)

    Bødker, Rene

    of samples and hence early detection of outbreaks. Models for vector borne diseases in Denmark have demonstrated dramatic variation in outbreak risk during the season and between years. The Danish VetMap project aims to make these risk based surveillance estimates available on the veterinarians smart phones...... in Northern Europe. This model approach may be used as a basis for risk based surveillance. In risk based surveillance limited resources for surveillance are targeted at geographical areas most at risk and only when the risk is high. This makes risk based surveillance a cost effective alternative...... sample to a diagnostic laboratory. Risk based surveillance models may reduce this delay. An important feature of risk based surveillance models is their ability to continuously communicate the level of risk to veterinarians and hence increase awareness when risk is high. This is essential for submission...

  4. Generic Inspection Planning for Steel Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Faber, Michael H.

    2002-01-01

    This paper presents a simplified and practically applicable approach for risk based inspection planning of fatigue sensitive structural details in steel structures. The basic idea is that the fatigue sensitive details are categorized according to their Fatigue Design Factor (FDF) and SN curve. When...

  5. Risk-based management of invading plant disease.

    Science.gov (United States)

    Hyatt-Twynam, Samuel R; Parnell, Stephen; Stutt, Richard O J H; Gottwald, Tim R; Gilligan, Christopher A; Cunniffe, Nik J

    2017-05-01

    Effective control of plant disease remains a key challenge. Eradication attempts often involve removal of host plants within a certain radius of detection, targeting asymptomatic infection. Here we develop and test potentially more effective, epidemiologically motivated, control strategies, using a mathematical model previously fitted to the spread of citrus canker in Florida. We test risk-based control, which preferentially removes hosts expected to cause a high number of infections in the remaining host population. Removals then depend on past patterns of pathogen spread and host removal, which might be nontransparent to affected stakeholders. This motivates a variable radius strategy, which approximates risk-based control via removal radii that vary by location, but which are fixed in advance of any epidemic. Risk-based control outperforms variable radius control, which in turn outperforms constant radius removal. This result is robust to changes in disease spread parameters and initial patterns of susceptible host plants. However, efficiency degrades if epidemiological parameters are incorrectly characterised. Risk-based control including additional epidemiology can be used to improve disease management, but it requires good prior knowledge for optimal performance. This focuses attention on gaining maximal information from past epidemics, on understanding model transferability between locations and on adaptive management strategies that change over time. © 2017 The Authors. New Phytologist © 2017 New Phytologist Trust.

  6. Strategy of Risk-Informed Inspection for Secondary Systems in NPPs

    International Nuclear Information System (INIS)

    Kim, So Young; Heo, Gyun Young

    2012-01-01

    Recently, unexpected accidents such as large-scale blackout have been occurred due to increasing demand of electricity. The unplanned trips have great influence over the economics although they rarely affect the safety of system. Because the cost for inspection and maintenance is limited, it is beneficial not only economically to take follow-up action in a timely manner to prevent plant trip but also in safety by protecting against the risk which is occurred from trip. In nuclear power plants (NPPs), the importance about risk-informed service such as inspection, maintenance and replacement is becoming on the rise. Risk-informed techniques such as in-service test, in-service inspection, design guide change and etc. are already used in nuclear field but these techniques are applied focusing on primary system for safety-related regulatory issues. It is needed to consider the optimization of inspection informed risk for entire plant including secondary system which is not applied enough. The study about risk-based inspection for boilers in thermal power field is in progress actively, but not for turbine cycle, which is similar with nuclear industry. Today, the most of inspections or tests for turbine cycle are time-based maintenance, being performed on time. It is required to perform condition-based maintenance by evaluating risk analyzing both of probability and consequence simultaneously about damage mechanisms that can be predicted by equipment or devices configuring the secondary system. Probability of failure (POF) is analyzed in terms of materials' ageing mechanisms, but consequence of failure (COF) should be evaluated in terms of thermohydraulic condition then it is needed to check power loss and period of maintenance. This paper is going to propose the idea to quantify the consequence of failure using the fault tree and simulation for secondary system, and propose quantitative risk-informed inspection by these approaches

  7. WTS - Risk Based Resource Targeting (RBRT) -

    Data.gov (United States)

    Department of Transportation — The Risk Based Resource Targeting (RBRT) application supports a new SMS-structured process designed to focus on safety oversight of systems and processes rather than...

  8. Terahertz Radome Inspection

    Directory of Open Access Journals (Sweden)

    Fabian Friederich

    2018-01-01

    Full Text Available Radomes protecting sensitive radar, navigational, and communications equipment of, e.g., aircraft, are strongly exposed to the environment and have to withstand harsh weather conditions and potential impacts. Besides their significance to the structural integrity of the radomes, it is often crucial to optimize the composite structures for best possible radio performance. Hence, there exists a significant interest in non-destructive testing techniques, which can be used for defect inspection of radomes in field use as well as for quality inspection during the manufacturing process. Contactless millimeter-wave and terahertz imaging techniques provide millimeter resolution and have the potential to address both application scenarios. We report on our development of a three-dimensional (3D terahertz imaging system for radome inspection during industrial manufacturing processes. The system was designed for operation within a machining center for radome manufacturing. It simultaneously gathers terahertz depth information in adjacent frequency ranges, from 70 to 110 GHz and from 110 to 170 GHz by combining two frequency modulated continuous-wave terahertz sensing units into a single measurement device. Results from spiraliform image acquisition of a radome test sample demonstrate the successful integration of the measurement system.

  9. Risk-based Optimization and Reliability Levels of Coastal Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Burcharth, H. F.

    Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure, in...... on the minimumcost reliability levels is investigated for different values of the real rate of interest, the service lifetime, the downtime costs due to malfunction and the decommission costs.......Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure...

  10. Risk-based Optimization and Reliability Levels of Coastal Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Burcharth, Hans F.

    2005-01-01

     Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure, i...... on the minimumcost reliability levels is investigated for different values of the real rate of interest, the service lifetime, the downtime costs due to malfunction and the decommission costs....... Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure...

  11. Risk-based Regulatory Evaluation Program methodology

    International Nuclear Information System (INIS)

    DuCharme, A.R.; Sanders, G.A.; Carlson, D.D.; Asselin, S.V.

    1987-01-01

    The objectives of this DOE-supported Regulatory Evaluation Progrwam are to analyze and evaluate the safety importance and economic significance of existing regulatory guidance in order to assist in the improvement of the regulatory process for current generation and future design reactors. A risk-based cost-benefit methodology was developed to evaluate the safety benefit and cost of specific regulations or Standard Review Plan sections. Risk-based methods can be used in lieu of or in combination with deterministic methods in developing regulatory requirements and reaching regulatory decisions

  12. Operational phase of inspection prioritization

    International Nuclear Information System (INIS)

    Campbell, D.J.; Guthrie, V.H.; Flanagan, G.F.

    1986-01-01

    Inspectors must make many decisions on the allocation of their efforts. To date, these decisions have been made based upon their own judgment and guidance from inspection procedures. Our goal is to provide probabilistic risk assessment (PRA) information as an additional aid to inspectors. A structured approach for relating PRA information to specific inspection decisions has been developed. The use of PRA information as an aid in optimal decision making: (1) in response to the current plant status and (2) in the scheduling of effort over an extended period of time is considered

  13. Risk-based and deterministic regulation

    International Nuclear Information System (INIS)

    Fischer, L.E.; Brown, N.W.

    1995-07-01

    Both risk-based and deterministic methods are used for regulating the nuclear industry to protect the public safety and health from undue risk. The deterministic method is one where performance standards are specified for each kind of nuclear system or facility. The deterministic performance standards address normal operations and design basis events which include transient and accident conditions. The risk-based method uses probabilistic risk assessment methods to supplement the deterministic one by (1) addressing all possible events (including those beyond the design basis events), (2) using a systematic, logical process for identifying and evaluating accidents, and (3) considering alternative means to reduce accident frequency and/or consequences. Although both deterministic and risk-based methods have been successfully applied, there is need for a better understanding of their applications and supportive roles. This paper describes the relationship between the two methods and how they are used to develop and assess regulations in the nuclear industry. Preliminary guidance is suggested for determining the need for using risk based methods to supplement deterministic ones. However, it is recommended that more detailed guidance and criteria be developed for this purpose

  14. Risk-based SMA for Cubesats

    Science.gov (United States)

    Leitner, Jesse

    2016-01-01

    This presentation conveys an approach for risk-based safety and mission assurance applied to cubesats. This presentation accompanies a NASA Goddard standard in development that provides guidance for building a mission success plan for cubesats based on the risk tolerance and resources available.

  15. Reliability-Based Inspection Planning for Structural Systems

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    1993-01-01

    A general model for reliability-based optimal inspection and repair strategies for structural systems is described. The total expected costs in the design lifetime is minimized with the number of inspections, the inspection times and efforts as decision variables. The equivalence of this model...... with a preposterior analysis from statistical decision theory is discussed. It is described how information obtained by an inspection can be used in a repair decision. Stochastic models for inspection, measurement and repair actions are presented. The general model is applied for inspection and repair planning...

  16. Additive Manufacturing Infrared Inspection

    Science.gov (United States)

    Gaddy, Darrell; Nettles, Mindy

    2015-01-01

    The Additive Manufacturing Infrared Inspection Task started the development of a real-time dimensional inspection technique and digital quality record for the additive manufacturing process using infrared camera imaging and processing techniques. This project will benefit additive manufacturing by providing real-time inspection of internal geometry that is not currently possible and reduce the time and cost of additive manufactured parts with automated real-time dimensional inspections which deletes post-production inspections.

  17. 13 CFR 120.1000 - Risk-Based Lender Oversight.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Risk-Based Lender Oversight. 120.1000 Section 120.1000 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Supervision § 120.1000 Risk-Based Lender Oversight. (a) Risk-Based Lender...

  18. Probabilistic Fatigue Life Updating for Railway Bridges Based on Local Inspection and Repair.

    Science.gov (United States)

    Lee, Young-Joo; Kim, Robin E; Suh, Wonho; Park, Kiwon

    2017-04-24

    Railway bridges are exposed to repeated train loads, which may cause fatigue failure. As critical links in a transportation network, railway bridges are expected to survive for a target period of time, but sometimes they fail earlier than expected. To guarantee the target bridge life, bridge maintenance activities such as local inspection and repair should be undertaken properly. However, this is a challenging task because there are various sources of uncertainty associated with aging bridges, train loads, environmental conditions, and maintenance work. Therefore, to perform optimal risk-based maintenance of railway bridges, it is essential to estimate the probabilistic fatigue life of a railway bridge and update the life information based on the results of local inspections and repair. Recently, a system reliability approach was proposed to evaluate the fatigue failure risk of structural systems and update the prior risk information in various inspection scenarios. However, this approach can handle only a constant-amplitude load and has limitations in considering a cyclic load with varying amplitude levels, which is the major loading pattern generated by train traffic. In addition, it is not feasible to update the prior risk information after bridges are repaired. In this research, the system reliability approach is further developed so that it can handle a varying-amplitude load and update the system-level risk of fatigue failure for railway bridges after inspection and repair. The proposed method is applied to a numerical example of an in-service railway bridge, and the effects of inspection and repair on the probabilistic fatigue life are discussed.

  19. Reliability Assessment and Reliability-Based Inspection and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    Probabilistic methodologies represent an important tool to identify the suitable strategy to inspect and deal with the deterioration in structures such as offshore wind turbines (OWT). Reliability based methods such as Risk Based Inspection (RBI) planning may represent a proper methodology to opt...

  20. Organizational Learning, Building and Sustaining Core Competencies: Knowledge Management Initiatives on Inspection and Regulatory Enforcement in BAPETEN Indonesia

    International Nuclear Information System (INIS)

    Daeng Beta, W. P.; Nurwidi Astuti, Y. H.; Hermawan, A. S.; Syaifulloh, S.

    2016-01-01

    Full text: Regulatory inspection and law enforcement are among the core competencies of the Indonesia Nuclear Energy Regulatory Agency (BAPETEN). Knowledge management (KM) initiatives are based on strategic planning of BAPETEN. KM in BAPETEN is in its early stage, it is realized since 2015–2016, although its elements have stayed in service for 18 years. Its architecture and performance-information are: to conduct risk based inspection for medical, industrial and research facilities; to plan, monitor and evaluate of effective inspection, including standard operating procedures (SOPs); to utilize inspectors for safety security of radiation sources along with coordination with related stakeholders; to enforce the safety and security facilities report to users; to optimize reliable data communication, processing and information technology (B@LIS); to perform regulatory enforcement along with other related stakeholders. KM processes are performed through the “Socialization, Externalization, Combination, Internalization” (SECI) model. Technical knowledge for inspectors are based on the IAEA–TECDOC–1526 plus supporting knowledge. With KM, innovation products can easily be used, because they are documented, distributed in a KM portal, knowledge is shared through the BAPETEN website, B@LIS database and others. Our challenge is that KM initiatives still need a tremendous effort, not only internally, but also externally, especially in coordination and collaboration. Information access brings about not only positive but also negative impacts. Innovations in regulatory inspection and law enforcement in BAPETEN are planned innovations, sustained, and systematically performed. (author

  1. Automated Inspection of Aircraft

    Science.gov (United States)

    1998-04-01

    This report summarizes the development of a robotic system designed to assist aircraft inspectors by remotely deploying non-destructive inspection (NDI) sensors and acquiring, processing, and storing inspection data. Carnegie Mellon University studie...

  2. Risk based limits for Operational Safety Requirements

    International Nuclear Information System (INIS)

    Cappucci, A.J. Jr.

    1993-01-01

    OSR limits are designed to protect the assumptions made in the facility safety analysis in order to preserve the safety envelope during facility operation. Normally, limits are set based on ''worst case conditions'' without regard to the likelihood (frequency) of a credible event occurring. In special cases where the accident analyses are based on ''time at risk'' arguments, it may be desirable to control the time at which the facility is at risk. A methodology has been developed to use OSR limits to control the source terms and the times these source terms would be available, thus controlling the acceptable risk to a nuclear process facility. The methodology defines a new term ''gram-days''. This term represents the area under a source term (inventory) vs time curve which represents the risk to the facility. Using the concept of gram-days (normalized to one year) allows the use of an accounting scheme to control the risk under the inventory vs time curve. The methodology results in at least three OSR limits: (1) control of the maximum inventory or source term, (2) control of the maximum gram-days for the period based on a source term weighted average, and (3) control of the maximum gram-days at the individual source term levels. Basing OSR limits on risk based safety analysis is feasible, and a basis for development of risk based limits is defensible. However, monitoring inventories and the frequencies required to maintain facility operation within the safety envelope may be complex and time consuming

  3. Risk-based remediation: Approach and application

    International Nuclear Information System (INIS)

    Frishmuth, R.A.; Benson, L.A.

    1995-01-01

    The principle objective of remedial actions is to protect human health and the environment. Risk assessments are the only defensible tools available to demonstrate to the regulatory community and public that this objective can be achieved. Understanding the actual risks posed by site-related contamination is crucial to designing cost-effective remedial strategies. All to often remedial actions are overdesigned, resulting in little to no increase in risk reduction while increasing project cost. Risk-based remedial actions have recently been embraced by federal and state regulators, industry, government, the scientific community, and the public as a mechanism to implement rapid and cost-effective remedial actions. Emphasizing risk reduction, rather than adherence to ambiguous and generic standards, ensures that only remedial actions required to protect human health and the environment at a particular site are implemented. Two sites are presented as case studies on how risk-based approaches are being used to remediate two petroleum hydrocarbon contaminated sites. The sites are located at two US Air Force Bases, Wurtsmith Air Force Base (AFB) in Oscoda, Michigan and Malmstrom AFB in Great Falls, Montana

  4. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  5. Technical objectives of inspection

    International Nuclear Information System (INIS)

    Sorenson, R.J.; Stewart, K.B.; Schneider, R.A.

    1976-01-01

    The various technical objectives of inspection are discussed in a very general manner. The discussion includes how the inspection function is related to the assumed threat, the various degrees of assurance and reliance on criteria, and the hierarchy of assurance which is obtained from the various types or levels of inspection

  6. Software Formal Inspections Guidebook

    Science.gov (United States)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  7. Health economics and outcomes methods in risk-based decision-making for blood safety

    NARCIS (Netherlands)

    Custer, Brian; Janssen, Mart P.

    2015-01-01

    Analytical methods appropriate for health economic assessments of transfusion safety interventions have not previously been described in ways that facilitate their use. Within the context of risk-based decision-making (RBDM), health economics can be important for optimizing decisions among competing

  8. Risk-based decision making and risk management of European Union regional programs

    Directory of Open Access Journals (Sweden)

    Michalopoulos Evangelos

    2008-01-01

    Full Text Available This paper presents a generalized method for management decision making incorporating risk assessment techniques. The risk based decision making methodology is applied to European Union expenditure programs used to implement its regional policy, such as the community support framework, community initiatives, special initiatives and other European policies. An example is presented for the development of an audit (inspection program in the region of West Macedonia, Greece, during the implementation of the 3rd Community Structural Support Framework Operational Program. The generic nature of the method permits its use in the management of similar European regional programs in Greece and other European countries. It is also applicable to many other industries interested in applying risk-based management decisions to physical or process based systems. .

  9. Randomization of inspections

    International Nuclear Information System (INIS)

    Markin, J.T.

    1989-01-01

    As the numbers and complexity of nuclear facilities increase, limitations on resources for international safeguards may restrict attainment of safeguards goals. One option for improving the efficiency of limited resources is to expand the current inspection regime to include random allocation of the amount and frequency of inspection effort to material strata or to facilities. This paper identifies the changes in safeguards policy, administrative procedures, and operational procedures that would be necessary to accommodate randomized inspections and identifies those situations where randomization can improve inspection efficiency and those situations where the current nonrandom inspections should be maintained. 9 refs., 1 tab

  10. Development of a computer system to optimize the registration of scheduled inspections and the occurrences observed in field; Desenvolvimento de um sistema computacional para otimizar o cadastramento das inspecoes programadas e das ocorrencias observadas em campo

    Energy Technology Data Exchange (ETDEWEB)

    Senne, E.L F.; Freire Junior, J.C.; Fernandes Filho, G.E.F.; Cassula, A.M. [Universidade Estadual Paulista (FEG/UNESP), Guaratingueta, SP (Brazil). Fac. de Engenharia], E-mails: elfsenne@feg.unesp.br, jcfreire@feg.unesp.br, gfilippo@feg.unesp.br, agnelo@feg.unesp.br; Avila, J.I. [Bandeirante Energia S.A., Sao Jose dos Campos, SP (Brazil)], Email: joao.avila@enbr.com.br

    2009-07-01

    The development of computational tools for programming and implementing inspections in distribution aerial network is presented. The programming of inspections can be elaborated for each maintenance centre or for the entire concession centrally. Inspections may be programmed for any time horizon. Running of scheduled inspections is made with the aid of mobile devices PDA (Personal Digital Assistant) type through an system developed in J2ME for data collection. Data collected on the defects observed are stored in the PDA in an XML file format and can be exported to a database through the Internet. The programming system of inspections, from the information stored in the database, may issue reports about registered inspections, about the observations recorded and about the canceled inspections.

  11. Risk-based management of remaining life of power plant components

    International Nuclear Information System (INIS)

    Roos, E.; Jovanovic, A.S.; Maile, K.; Auerkari, P.

    1999-01-01

    The paper describes application of different modules of the MPA-System ALIAS in risk-based management of remaining life of power plant components. The system allows comprehensive coverage of all aspects of the remaining life management, including also the risk analysis and risk management. In addition, thanks to the modular character of the system it is also possible to implement new methods: In the case described here, a new (probabilistic) method for determination of the next inspection time for the components exposed to creep loading has been developed and implemented in the system. Practical application of the method has shown (a) that the mean values obtained by the method fall into the range of results obtained by other methods (based on expert knowledge), and (b) that it is possible to quantify the probability of aberration from the mean values. This in turn allows quantifying the additional risks linked to e.g. prolonging of inspection intervals. (orig.) [de

  12. Research on UAV Intelligent Obstacle Avoidance Technology During Inspection of Transmission Line

    Science.gov (United States)

    Wei, Chuanhu; Zhang, Fei; Yin, Chaoyuan; Liu, Yue; Liu, Liang; Li, Zongyu; Wang, Wanguo

    Autonomous obstacle avoidance of unmanned aerial vehicle (hereinafter referred to as UAV) in electric power line inspection process has important significance for operation safety and economy for UAV intelligent inspection system of transmission line as main content of UAV intelligent inspection system on transmission line. In the paper, principles of UAV inspection obstacle avoidance technology of transmission line are introduced. UAV inspection obstacle avoidance technology based on particle swarm global optimization algorithm is proposed after common obstacle avoidance technologies are studied. Stimulation comparison is implemented with traditional UAV inspection obstacle avoidance technology which adopts artificial potential field method. Results show that UAV inspection strategy of particle swarm optimization algorithm, adopted in the paper, is prominently better than UAV inspection strategy of artificial potential field method in the aspects of obstacle avoidance effect and the ability of returning to preset inspection track after passing through the obstacle. An effective method is provided for UAV inspection obstacle avoidance of transmission line.

  13. On risk-based operation and maintenance of offshore wind turbine components

    International Nuclear Information System (INIS)

    Jessen Nielsen, Jannie; Dalsgaard Sorensen, John

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated.

  14. An application of the eddy-current method for inspections of austenitic cladding

    International Nuclear Information System (INIS)

    Kubis, S.; Herka, M.; Krajcovic, R.

    1999-01-01

    The application of the eddy-current method for inspections of austenitic cladding by means of pancake probes. Phase and amplitude characteristics of artificial defects and anticipated interference signals. Optimization of inspection parameters

  15. Enhancement of the reliability of automated ultrasonic inspections using tools of quantitative NDT

    International Nuclear Information System (INIS)

    Kappes, W.; Baehr, W.; Kroening, M.; Schmitz, V.

    1994-01-01

    To achieve reliable test results from automated ultrasonic inspection of safety related components, optimization and integral consideration of the various inspection stages - inspection planning, inspection performance and evaluation of results - are indispensable. For this purpose, a large potential of methods is available: advanced measurement techniques, mathematical-numerical modelling processes, artificial intelligence tools, data bases and CAD systems. The potential inherent in these methods to enhance inspection reliability is outlined by way of different applications. (orig.) [de

  16. Advancement of safeguards inspection technology for CANDU nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Sung; Park, W S; Cha, H R; Ham, Y S; Lee, Y G; Kim, K P; Hong, Y D

    1999-04-01

    The objectives of this project are to develop both inspection technology and safeguards instruments, related to CANDU safeguards inspection, through international cooperation, so that those outcomes are to be applied in field inspections of national safeguards. Furthermore, those could contribute to the improvement of verification correctness of IAEA inspections. Considering the level of national inspection technology, it looked not possible to perform national inspections without the joint use of containment and surveillance equipment conjunction with the IAEA. In this connection, basic studies for the successful implementation of national inspections was performed, optimal structure of safeguards inspection was attained, and advancement of safeguards inspection technology was forwarded. The successful implementation of this project contributed to both the improvement of inspection technology on CANDU reactors and the implementation of national inspection to be performed according to the legal framework. In addition, it would be an opportunity to improve the ability of negotiating in equal shares in relation to the IAEA on the occasion of discussing or negotiating the safeguards issues concerned. Now that the national safeguards technology for CANDU reactors was developed, the safeguards criteria, procedure and instruments as to the other item facilities and fabrication facilities should be developed for the perfection of national inspections. It would be desirable that the recommendations proposed and concreted in this study, so as to both cope with the strengthened international safeguards and detect the undeclared nuclear activities, could be applied to national safeguards scheme. (author)

  17. General inspection strategy for fault diagnosis-minimizing the inspection costs

    International Nuclear Information System (INIS)

    Reinertsen, Rune; Wang Xiaozhong

    1995-01-01

    In this paper, a general inspection strategy for system fault diagnosis is presented. The procedure presented in this paper, is an improvement of methods described in papers by , and . This general strategy provides the optimal inspection procedure when the inspections require unequal effort and the minimum cut set probabilities are unequal. This feature makes the procedure described in this paper more useful for practical applications than the most recent procedure presented in the paper by Najmus-Saqib and Ishaque, which requires the minimum cut set probabilities to be equal. The inspection strategy described in this paper is based on first inspecting the basic event that will provide the maximum information gain per unit cost invested. The information gain is measured by the decrease of Shannon entropy. A detailed tutorial example is presented

  18. Application of corrosion screening tools for riser inspection

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud; Vijayan, S.

    2003-01-01

    As offshore facilities approach the end of their design life, owners would like to assess the condition and integrity of plant and equipment. Detailed inspection, including non-destructive testing (NDT), are implemented and results are utilised for predictive maintenance and estimating useful remaining life. Except for risk based inspection, the extent of surface coverage required would be more compared to inspection of pre-determined spots. Risers, for example, usually have several layers of coating that prevent use of conventional techniques for inspection of corrosion. Complete coverage requires access (including removal coatings and insulation). Inspection utilising the conventional NDT tools can be very slow and expensive. However, recent advances have forwarded the use of specialised NDT techniques that were developed for inspection of corrosion under insulation (CUI). This paper details two screening inspection tools, LIXI Profiler and RTD-INCOTEST that have been applied to inspection of risers. LIXI Profiler is based on attenuation of penetrating radiation by materials, and RTD-INCOTEST is based on decay of pulsed eddy current in materials. (Author)

  19. Risk-based regulation: A regulatory perspective

    International Nuclear Information System (INIS)

    Scarborough, J.C.

    1993-01-01

    In the early development of regulations for nuclear power plants, risk was implicitly considered through qualitative assessments and engineering reliability principles and practices. Examples included worst case analysis, defense in depth, and the single failure criterion. However, the contributions of various systems, structures, components and operator actions to plant safety were not explicitly assessed since a methodology for this purpose had not been developed. As a consequence of the TMI accident, the use of more quantitative risk methodology and information in regulation such as probabilistic risk analysis (PRA) increased. The use of both qualitative and quantitative consideration of risk in regulation has been a set of regulations and regulatory guides and practices that ensure adequate protection of public health and safety. Presently, the development of PRA techniques has developed to the point that safety goals, expressed in terms of risk, have been established to help guide further regulatory decision making. This paper presents the personal opinions of the author as regards the use of risk today in nuclear power plant regulation, areas of further information needs, and necessary plans for moving toward a more systematic use of risk-based information in regulatory initiatives in the future

  20. Risk-based plant performance indicators

    International Nuclear Information System (INIS)

    Boccio, J.L.; Azarm, M.A.; Hall, R.E.

    1991-01-01

    Tasked by the 1979 President's Commission on the Accident at Three Mile Island, the U.S. nuclear power industry has put into place a performance indicator program as one means for showing a demonstrable record of achievement. Largely through the efforts of the Institute of Nuclear Power Operations (INPO), plant performance data has, since 1983, been collected and analyzed to aid utility management in measuring their plants' performance progress. The U.S. Nuclear Regulatory Commission (NRC) has also developed a set of performance indicators. This program, conducted by NRC's Office for the Analysis and Evaluation of Operational Data (AEOD), is structured to present information on plant operational performance in a manner that could enhance the staff's ability to recognize changes in the safety performance. Both organizations recognized that performance indicators have limitations and could be subject to misinterpretation and misuse with the potential for an adverse impact on safety. This paper reports on performance indicators presently in use, e.g., unplanned automatic scrams, unplanned safety system actuation, safety system failures, etc., which are logically related to safety. But, a reliability/risk-based method for evaluating either individual indicators or an aggregated set of indicators is not yet available

  1. Project transition to risk based corrective action

    International Nuclear Information System (INIS)

    Judge, J.M.; Cormier, S.L.

    1996-01-01

    Many states have adopted or are considering the adoption of the America Society for Testing and Materials (ASTM) Standard E 1739, Standard for Risk Based Corrective Action (RBCA) Applied to Petroleum Release Sites. This standard is being adopted to regulate leaking underground storage tank (LUST) sites. The case studies of two LUST sites in Michigan will be presented to demonstrate the decision making process and limiting factors involved in transitioning sites to the RBCA program. Both of these case studies had been previously investigated and one was actively remediated. The first case study involves a private petroleum facility where soil and ground water have been impacted. Remediation involved a ground water pump and treat system. Subsequent monitoring during system operation indicated that analytical data were still above the Tier 1 RBSLs but below the Tier 2 SSTLs. The closure strategy that was developed was based on the compounds of concern that were below the SSTLs. A deed restriction was also developed for the site as an institutional control. The second LUST site exhibited BTEX concentrations in soil and ground water above the Tier 1 RBSLs. Due to the exceedence of the Tier 1 RBSLs, the second site required a Tier 2 assessment to develop SSTLs as remedial objectives and remove hot spots in the soil and treat the ground water to achieve closure. Again, a deed restriction was instituted along with a performance monitoring plan

  2. Optical fiber inspection system

    Science.gov (United States)

    Moore, Francis W.

    1987-01-01

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

  3. 46 CFR 153.812 - Inspection for Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inspection for Certificate of Inspection. 153.812... CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Testing and Inspection § 153.812 Inspection for Certificate of Inspection. The rules governing the...

  4. 77 FR 58091 - Risk-Based Sampling of Beef Manufacturing Trimmings for Escherichia coli (E. coli) O157:H7 and...

    Science.gov (United States)

    2012-09-19

    ... for exposure of carcasses and parts to any contamination or food safety hazard during the removal of... DEPARTMENT OF AGRICULTURE Food Safety and Inspection Service [Docket No. FSIS-2012-0020] Risk-Based Sampling of Beef Manufacturing Trimmings for Escherichia coli (E. coli) O157:H7 and Plans for Beef...

  5. Technical regulation of nondestructive inspection

    International Nuclear Information System (INIS)

    1995-01-01

    It starts with the explanation of definition of nondestructive inspection and qualifications for a inspection. It lists the technical regulations of nondestructive inspections which are radiographic testing, ultrasonic flaw detecting test, liquid penetrant test, magnetic particle inspection, eddy current test visual inspection and leakage test.

  6. Nonperiodic inspections to guarantee a prescribed level of reliability

    NARCIS (Netherlands)

    Newby, M.J.; Barker, C.T.; Vonta, F.; Nikulin, M; Limnios, N.; Huber-Carol, C.

    2008-01-01

    A cost-optimal nonperiodic inspection policy is derived for complex multicomponent systems. The model takes into consideration the degradation of all the components in the system with the use of a Bessel process with drift. The inspection times are determined by a deterministic function and depend

  7. Inspection Based Evaluation of a Danish Road Bridge

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper it is shown how an inspection-based evaluation of a Danish road bridge may be performed using the BRIDGE1 and BRIDGE2 bridge management systems produced within the EC-supported research programme "Assessment of Performance and Optimal Strategies for Inspection and Maintenance...

  8. Game theory and risk-based leveed river system planning with noncooperation

    Science.gov (United States)

    Hui, Rui; Lund, Jay R.; Madani, Kaveh

    2016-01-01

    Optimal risk-based levee designs are usually developed for economic efficiency. However, in river systems with multiple levees, the planning and maintenance of different levees are controlled by different agencies or groups. For example, along many rivers, levees on opposite riverbanks constitute a simple leveed river system with each levee designed and controlled separately. Collaborative planning of the two levees can be economically optimal for the whole system. Independent and self-interested landholders on opposite riversides often are willing to separately determine their individual optimal levee plans, resulting in a less efficient leveed river system from an overall society-wide perspective (the tragedy of commons). We apply game theory to simple leveed river system planning where landholders on each riverside independently determine their optimal risk-based levee plans. Outcomes from noncooperative games are analyzed and compared with the overall economically optimal outcome, which minimizes net flood cost system-wide. The system-wide economically optimal solution generally transfers residual flood risk to the lower-valued side of the river, but is often impractical without compensating for flood risk transfer to improve outcomes for all individuals involved. Such compensation can be determined and implemented with landholders' agreements on collaboration to develop an economically optimal plan. By examining iterative multiple-shot noncooperative games with reversible and irreversible decisions, the costs of myopia for the future in making levee planning decisions show the significance of considering the externalities and evolution path of dynamic water resource problems to improve decision-making.

  9. Cost effectiveness of risk-based closures at UST sites

    International Nuclear Information System (INIS)

    Scruton, K.M.; Baker, J.N.

    1995-01-01

    Risk-based closures have been achieved at Underground Storage Tank (UST) sites throughout the country for a major transportation company. The risk-based closures were cost-effective because a streamlined risk-based approach was used instead of the generic baseline risk assessment approach. USEPA has recently provided guidance encouraging the use of risk-based methodology for achieving closure at UST sites. The risk-based approach used in achieving the site closures involved an identification of potential human and ecological receptors and exposure pathways, and a comparison of maximum onsite chemical concentrations to applicable or relevant and appropriate requirements (ARARs). The ARARs used in the evaluation included Federal and/or State Maximum Contaminant Levels (MCLs) for groundwater and risk-based screening levels for soils. If the maximum concentrations were above the screening levels, a baseline risk assessment was recommended. In several instances, however, the risk-based approach resulted in a regulatory agency acceptance of a ''no further action'' alternative at UST sites which did not pose a significant threat to human health and the environment. The cost of the streamlined risk-based approach is approximately $3,500, while a baseline risk assessment for the same UST site could cost up to $10,000 or more. The use of the streamlined risk-based approach has proven to be successful for achieving a ''no further action'' outcome for the client at a reasonable cost

  10. Cernavoda NPP risk - Based test and maintenance planning - Methodology development

    International Nuclear Information System (INIS)

    Georgescu, G.; Popa, P.; Petrescu, A.; Naum, M.; Gutu, M.

    1997-01-01

    The Cernavoda Power Plant starts the commercial operation in November 1996. During operation of the nuclear power plant, several mandatory tests and maintenance are performed on stand-by safety system components to ensure their availability in case of accident. The basic purpose of such activities is the early detection of any failure and degradation, and timely correction of deteriorations. Because of the large number of such activities, emphasis on plant safety and allocation of resources becomes difficult. The probabilistic model and methodology can be effectively used to obtain the risk significance of these activities so that the resources are directed to the most important areas. The proposed Research Contract activity is strongly connected with other safety related areas under development. Since, the Cernavoda Probabilistic Safety Evaluation Level 1 PSA Study (CPSE) was performed and now the study is revised taking into account the as-built information, it is recommended to implement into the model the necessary modeling features to support further PSA application, especially related to Test and Maintenance optimization. Methods need to be developed in order to apply the PSA model including risk information together with other needed information for Test and Maintenance optimization. Also, in parallel with the CPSE study updating, the software interface for the PSA model is under development (Risk Monitor Software class), methods and models needing to be developed for the purpose of using it for qualified monitoring of Test and Maintenance Strategy efficiency. Similar, the Data Collection System need to be appropriate for the purpose of an ongoing implementation of a risk - based Test and Maintenance Strategy. (author). 4 refs, 1 fig

  11. The case for risk-based premiums in public health insurance.

    Science.gov (United States)

    Zweifel, Peter; Breuer, Michael

    2006-04-01

    Uniform, risk-independent insurance premiums are accepted as part of 'managed competition' in health care. However, they are not compatible with optimality of health insurance contracts in the presence of both ex ante and ex post moral hazard. They have adverse effects on insurer behaviour even if risk adjustment is taken into account. Risk-based premiums combined with means-tested, tax-financed transfers are advocated as an alternative.

  12. Runway Inspection by RPAS

    Directory of Open Access Journals (Sweden)

    Stanislav Absolon

    2015-10-01

    Full Text Available This article discusses the use of the RPAS for the inspection of the airport operating areas. The paper compares the current process of the inspection of the airport operating areas by the airport staff with the possibilities which are offered by the use of the modern technology RPAS. The following text also describes how to inspect airport operating areas by the RPAS, specific technical possibilities and the applicable technical solutions. Furthermore there are variants of piloting the RPAS, comparing usable equipment, equipment for video recording and the possibility of using thermal imaging camera in the article.

  13. Magnetic rubber inspection (MRI)

    International Nuclear Information System (INIS)

    Carro, L.

    1997-01-01

    Magnetic Rubber Inspection (MRI) was developed to inspect for small cracks and flaws encountered in high performance aircraft. A formula of very fine magnetic particles immersed in a room temperature curing rubber is catalysed and poured into dams (retainers) on the surface of the part to be inspected. Inducing a magnetic field then causes the particles to be drawn to discontinuities in the component under test. These indicating particles are held to the discontinuity by magnetic attraction, as the rubber cures. The solid rubber cast (Replica) is then removed and examined under a microscope for indicating lines of particle concentrations. 3 refs., 6 figs

  14. Automated PCB Inspection System

    Directory of Open Access Journals (Sweden)

    Syed Usama BUKHARI

    2017-05-01

    Full Text Available Development of an automated PCB inspection system as per the need of industry is a challenging task. In this paper a case study is presented, to exhibit, a proposed system for an immigration process of a manual PCB inspection system to an automated PCB inspection system, with a minimal intervention on the existing production flow, for a leading automotive manufacturing company. A detailed design of the system, based on computer vision followed by testing and analysis was proposed, in order to aid the manufacturer in the process of automation.

  15. A risk-based approach to scheduling audits.

    Science.gov (United States)

    Rönninger, Stephan; Holmes, Malcolm

    2009-01-01

    The manufacture and supply of pharmaceutical products can be a very complex operation. Companies may purchase a wide variety of materials, from active pharmaceutical ingredients to packaging materials, from "in company" suppliers or from third parties. They may also purchase or contract a number of services such as analysis, data management, audit, among others. It is very important that these materials and services are of the requisite quality in order that patient safety and company reputation are adequately protected. Such quality requirements are ongoing throughout the product life cycle. In recent years, assurance of quality has been derived via audit of the supplier or service provider and by using periodic audits, for example, annually or at least once every 5 years. In the past, companies may have used an audit only for what they considered to be "key" materials or services and used testing on receipt, for example, as their quality assurance measure for "less important" supplies. Such approaches changed as a result of pressure from both internal sources and regulators to the time-driven audit for all suppliers and service providers. Companies recognised that eventually they would be responsible for the quality of the supplied product or service and audit, although providing only a "snapshot in time" seemed a convenient way of demonstrating that they were meeting their obligations. Problems, however, still occur with the supplied product or service and will usually be more frequent from certain suppliers. Additionally, some third-party suppliers will no longer accept routine audits from individual companies, as the overall audit load can exceed one external audit per working day. Consequently a different model is needed for assessing supplier quality. This paper presents a risk-based approach to creating an audit plan and for scheduling the frequency and depth of such audits. The approach is based on the principles and process of the Quality Risk Management

  16. Risk based rulemaking and design - Proceed with caution

    DEFF Research Database (Denmark)

    Zachariadis, Panos; Psaraftis, Harilaos N.; Kontovas, Christos A.

    2007-01-01

    The trend towards a risk based regulatory framework at IMO and within classification societies is expanding while some voices claim that a full ship risk based scantlings design approach can be immediately implementable. This paper attempts to clarify some widely used, but confusing to many, noti...

  17. 12 CFR 652.70 - Risk-based capital level.

    Science.gov (United States)

    2010-01-01

    ... risk-based capital level is the sum of the following amounts: (a) Credit and interest rate risk. The... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Risk-based capital level. 652.70 Section 652.70 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM FEDERAL AGRICULTURAL MORTGAGE...

  18. Artist - analytical RT inspection simulation tool

    International Nuclear Information System (INIS)

    Bellon, C.; Jaenisch, G.R.

    2007-01-01

    The computer simulation of radiography is applicable for different purposes in NDT such as for the qualification of NDT systems, the prediction of its reliability, the optimization of system parameters, feasibility analysis, model-based data interpretation, education and training of NDT/NDE personnel, and others. Within the framework of the integrated project FilmFree the radiographic testing (RT) simulation software developed by BAM is being further developed to meet practical requirements for inspection planning in digital industrial radiology. It combines analytical modelling of the RT inspection process with the CAD-orientated object description applicable to various industrial sectors such as power generation, railways and others. (authors)

  19. Risk assessment application to NRC inspection

    International Nuclear Information System (INIS)

    Campbell, D.J.; Guthrie, V.H.; Flanagan, G.F.

    1987-01-01

    Inspectors must make many decisions on the allocation of their efforts. To date, these decisions have been made based upon their own judgment and guidance from inspection procedures. The program described in this paper provides PRA information as an additional aid to inspectors. A structured approach for relating PRA information to specific inspection decisions has been developed. The use of PRA information as an aid in optimal decision making (1) in response to the current plant status and (2) in the scheduling of effort over an extended period of time is considered. (orig.)

  20. Wheel inspection system environment.

    Science.gov (United States)

    2008-11-18

    International Electronic Machines Corporation (IEM) has developed and is now marketing a state-of-the-art Wheel Inspection System Environment (WISE). WISE provides wheel profile and dimensional measurements, i.e. rim thickness, flange height, flange ...

  1. Estimation of inspection effort

    International Nuclear Information System (INIS)

    Mullen, M.F.; Wincek, M.A.

    1979-06-01

    An overview of IAEA inspection activities is presented, and the problem of evaluating the effectiveness of an inspection is discussed. Two models are described - an effort model and an effectiveness model. The effort model breaks the IAEA's inspection effort into components; the amount of effort required for each component is estimated; and the total effort is determined by summing the effort for each component. The effectiveness model quantifies the effectiveness of inspections in terms of probabilities of detection and quantities of material to be detected, if diverted over a specific period. The method is applied to a 200 metric ton per year low-enriched uranium fuel fabrication facility. A description of the model plant is presented, a safeguards approach is outlined, and sampling plans are calculated. The required inspection effort is estimated and the results are compared to IAEA estimates. Some other applications of the method are discussed briefly. Examples are presented which demonstrate how the method might be useful in formulating guidelines for inspection planning and in establishing technical criteria for safeguards implementation

  2. Packaging supplier inspection guide

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Gregg, R.E.; Kido, C.; Boyle, C.D.

    1991-05-01

    This is document is a guide for conducting quality assurance inspections of transportations packaging suppliers, where suppliers are defined as designers, fabricators, distributors, users, or owners of transportation packaging. This document can be used during an inspection to determine regulatory compliance within the requirements of 10 Code of Federal Regulations, Part 71, Subpart H (10 CFR 71.101--71.135). The guidance described in this document provides a framework for an inspection. It provides the inspector with the flexibility to adapt the methods and concepts presented here to meet the needs of the particular facility being inspected. The guide was developed to ensure a structured and consistent approach for inspections. The method treats each activity at a supplier facility as a separate entity (or functional element), and combines the activities within the framework of an ''inspection tree.'' The method separates each functional element into several areas of performance and then identifies guidelines, based on regulatory requirements, to be used to qualitatively rate each area. This document was developed to serve as a field manual to facilitate the work of inspectors. 1 ref., 1 fig., 5 tabs

  3. Fuel inspection device

    International Nuclear Information System (INIS)

    Tsuji, Tadashi.

    1990-01-01

    The fuel inspection device of the present invention has a feature of obtaining an optimum illumination upon fuel rod interval inspection operation in a fuel pool. That is, an illumination main body used underwater is connected to a cable which is led out on a floor. A light control device is attached to the other end of the cable and an electric power cable is connected to the light control device. A light source (for example, incandescent lamp) is incorporated in the casing of the illumination main body, and a diffusion plate is disposed at the front to provide a plane light source. The light control device has a light control knob capable of remote-controlling the brightness of the light of the illumination main body. In the fuel inspection device thus constituted, halation is scarcely caused on the image screen upon inspection of fuels by a submerged type television camera to facilitate control upon inspection. Accordingly, efficiency of the fuel inspection can be improved to shorten the operation time. (I.S.)

  4. Methodology to identify risk-significant components for inservice inspection and testing

    International Nuclear Information System (INIS)

    Anderson, M.T.; Hartley, R.S.; Jones, J.L. Jr.; Kido, C.; Phillips, J.H.

    1992-08-01

    Periodic inspection and testing of vital system components should be performed to ensure the safe and reliable operation of Department of Energy (DOE) nuclear processing facilities. Probabilistic techniques may be used to help identify and rank components by their relative risk. A risk-based ranking would allow varied DOE sites to implement inspection and testing programs in an effective and cost-efficient manner. This report describes a methodology that can be used to rank components, while addressing multiple risk issues

  5. Incore inspection device

    International Nuclear Information System (INIS)

    Ogisu, Tatsuki; Taguchi, Kosei.

    1995-01-01

    The device of the present invention can inspect surfaces of equipments in reactor water in a nuclear reactor in a state of atmospheric air. Namely, an inspection device is movable forwardly and backwardly in a water-proof vessel. An annular sucker with pleats is disposed to the outer side of a lid of the water-proof vessel. A television camera for an under water monitoring is disposed to the inner side of the lid of the water-proof vessel by way of a partitioning wall with lid. Transferring screws are disposed at the back and on the side of the water-proof vessel. In the device having such a constitution, (1) the inside of the water-proof vessel is at first made water-tight by closing the partitioning wall with lid, (2) the back and the side screws are operated by the guide of the underwater monitoring television camera, to transfer the water-proof vessel to the surface of the reactor core to be inspected, (3) the annular sucker with pleats is urged on the surface to be inspected by the back screw, to fix the water-proof vessel, (4) reactor water in a space of the annular sucker with pleats is discharged and replaced with air, and (5) the lid of the partition wall with lid is opened and the inspection device is disposed at a position of the underwater monitoring television camera, to inspect the surface to be inspected in a state of atmospheric air. (I.S.)

  6. Value of information-based inspection planning for offshore structures

    DEFF Research Database (Denmark)

    Irman, Arifian Agusta; Thöns, Sebastian; Leira, Bernt J.

    2017-01-01

    with each inspection strategy. A simplified and generic risk-based inspection planning utilizing pre- posterior Bayesian decision analysis had been proposed by Faber et al. [1] and Straub [2]. This paper provides considerations on the theoretical background and a Value of Information analysis......-based inspection planning. The paper will start out with a review of the state-of-art RBI planning procedure based on Bayesian decision theory and its application in offshore structure integrity management. An example of the Value of Information approach is illustrated and it is pointed to further research......Asset integrity and management is an important part of the oil and gas industry especially for existing offshore structures. With declining oil price, the production rate is an important factor to be maintained that makes integrity of the structures one of the main concerns. Reliability based...

  7. Piping inspection round robin

    International Nuclear Information System (INIS)

    Heasler, P.G.; Doctor, S.R.

    1996-04-01

    The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths

  8. Inspection device in liquid

    International Nuclear Information System (INIS)

    Nagaoka, Etsuo.

    1996-01-01

    The present invention provides an inspection device in PWR reactor core in which inspection operations are made efficient by stabilizing a posture of the device in front-to-back, vertical and left-to-right directions by a simple structure. When the device conducts inspection while running in liquid, the front and the back directions of the device main body are inspected using a visual device while changing the posture by operating a front-to-back direction propulsion device and a right-to-left direction propulsion device, and a vertical direction propulsion device against to rolling, pitching and yawing of the device main body. In this case, a spherical magnet moves freely in the gravitational direction in a vibration-damping fluid in a non-magnetic spherical shell following the change of the posture of the device main body, in which the vibrations due to the movement of the spherical magnet is settled by the vibration-damping fluid thereby stabilizing the posture of the device main body. At a typical inspection posture, the settling effect is enhanced by the attraction force between the spherical magnets in the spherical shell and each of magnetic force-attracted magnetic members disposed to the outer circumference of the shell, and the posture of the device main body can be confirmed in front-to-back, right-to-left and vertical directions by each of the posture confirming magnetic sensors. (N.H.)

  9. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  10. Plant abnormality inspection device

    International Nuclear Information System (INIS)

    Takenaka, Toshio.

    1990-01-01

    The present invention concerns a plant abnormality inspection device for conducting remote or automatic patrolling inspection in a plant and, more particularly, relates to such a device as capable of detecting abnormal odors. That is, the device comprises a moving device for moving to a predetermined position in the plant, a plurality of gas sensors for different kind of gases to be inspected mounted thereon, a comparator for comparing the concentration of a gas detected by the gas sensor with the normal gas concentration at the predetermined position and a judging means for judging the absence or presence of abnormality depending on the combination of the result of the comparison and deliverying a signal if the state is abnormal. As a result, a slight amount of gas responsible to odors released upon abnormality of the plant can be detected by a plurality of gas sensors for different kinds gases to rapidly and easily find abnormal portions in the plant. (I.S.)

  11. Magnetic particle inspection

    Science.gov (United States)

    Sastri, Sankar

    1990-01-01

    The purpose of this experiment is to familiarize the student with magnetic particle inspection and relate it to classification of various defects. Magnetic particle inspection is a method of detecting the presence of cracks, laps, tears, inclusions, and similar discontinuities in ferromagnetic materials such as iron and steel. This method will most clearly show defects that are perpendicular to the magnetic field. The Magnaglo method uses a liquid which is sprayed on the workpiece to be inspected, and the part is magnetized at the same time. The workpiece is then viewed under a black light, and the presence of discontinuity is shown by the formation of a bright indication formed by the magnetic particles over the discontinuity. The equipment and experimental procedures are described.

  12. Federal environmental inspections handbook

    International Nuclear Information System (INIS)

    1991-10-01

    This Federal Environmental Inspection Handbook has been prepared by the Department of Energy (DOE), Office of Environmental Guidance, RCRA/CERCLA Division (EH-231). It is designed to provide DOE personnel with an easily accessible compilation of the environmental inspection requirements under Federal environmental statutes which may impact DOE operations and activities. DOE personnel are reminded that this Handbook is intended to be used in concert with, and not as a substitute for, the Code of Federal Regulations (CFR). Federal Register (FR), and other applicable regulatory documents

  13. Subsea Infrastructure Inspection

    DEFF Research Database (Denmark)

    Mai, Christian; Pedersen, Simon; Hansen, Leif

    2016-01-01

    Due to the increasing energy demands, the offshore energy business has boomed in recent decades. Sub-sea pipeline and power transmission cable installations are commonly applied worldwide. Any potential breakages can cause equipment damage and also damage the environment. The majority...... (S-AUVs) can significantly change the inspections of infrastructure, as these vehicles could be much cheaper to deploy. S-AUVs can potentially conduct faster data collection and provide higher inspection data quality. However, there are still some technical challenges related to: underwater wireless...

  14. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  15. A study on improvements of inspection efficiency with remote transmission of inspection data

    International Nuclear Information System (INIS)

    Kikuchi, Masahiro

    2010-01-01

    Current information networks technology brought secure and convenient condition of information transmission, so that inspectorates intend to apply such technology to optimize current inspection efforts. IAEA established the Remote Monitoring Project (RMP) in 1996 and started to draft safeguards concepts, and approaches to refer the implementation of remote monitoring technology and to compromise with relationship between current inspection activities and the remote monitoring technologies. Although communications costs and conditions of secured communication should be further investigated, the technologies would have a possibility to reduce current inspection efforts. We would face at the step to study on the several issues such as what measures could be candidate to use, how much cost we needs, what kind of technical risks would be concerned, further improvements could be achieved by comparison with current inspection costs and effectiveness. This paper reports on the expectation points and relevant technical attention points which are related to apply unattended inspection system with remote data transmission to the flows and inventory verification of item and bulk facility, respectively, in order to improve inspection efforts. (author)

  16. Cost-effectiveness and harm-benefit analyses of risk-based screening strategies for breast cancer.

    Directory of Open Access Journals (Sweden)

    Ester Vilaprinyo

    Full Text Available The one-size-fits-all paradigm in organized screening of breast cancer is shifting towards a personalized approach. The present study has two objectives: 1 To perform an economic evaluation and to assess the harm-benefit ratios of screening strategies that vary in their intensity and interval ages based on breast cancer risk; and 2 To estimate the gain in terms of cost and harm reductions using risk-based screening with respect to the usual practice. We used a probabilistic model and input data from Spanish population registries and screening programs, as well as from clinical studies, to estimate the benefit, harm, and costs over time of 2,624 screening strategies, uniform or risk-based. We defined four risk groups, low, moderate-low, moderate-high and high, based on breast density, family history of breast cancer and personal history of breast biopsy. The risk-based strategies were obtained combining the exam periodicity (annual, biennial, triennial and quinquennial, the starting ages (40, 45 and 50 years and the ending ages (69 and 74 years in the four risk groups. Incremental cost-effectiveness and harm-benefit ratios were used to select the optimal strategies. Compared to risk-based strategies, the uniform ones result in a much lower benefit for a specific cost. Reductions close to 10% in costs and higher than 20% in false-positive results and overdiagnosed cases were obtained for risk-based strategies. Optimal screening is characterized by quinquennial or triennial periodicities for the low or moderate risk-groups and annual periodicity for the high-risk group. Risk-based strategies can reduce harm and costs. It is necessary to develop accurate measures of individual risk and to work on how to implement risk-based screening strategies.

  17. Inspection of Emergency Arrangements

    International Nuclear Information System (INIS)

    2013-01-01

    The Working Group on Inspection Practices (WGIP) was tasked by the NEA CNRA to examine and evaluate the extent to which emergency arrangements are inspected and to identify areas of importance for the development of good inspection practices. WGIP members shared their approaches to the inspection of emergency arrangements by the use of questionnaires, which were developed from the requirements set out in IAEA Safety Standards. Detailed responses to the questionnaires from WGIP member countries have been compiled and are presented in the appendix to this report. The following commendable practices have been drawn from the completed questionnaires and views provided by WGIP members: - RBs and their Inspectors have sufficient knowledge and information regarding operator's arrangements for the preparedness and response to nuclear emergencies, to enable authoritative advice to be given to the national coordinating authority, where necessary. - Inspectors check that the operator's response to a nuclear emergency is adequately integrated with relevant response organisations. - Inspectors pay attention to consider the integration of the operator's response to safety and security threats. - The efficiency of international relations is checked in depth during some exercises (e.g. early warning, assistance and technical information), especially for near-border facilities that could lead to an emergency response abroad. - RB inspection programmes consider the adequacy of arrangements for emergency preparedness and response to multi-unit accidents. - RBs assess the adequacy of arrangements to respond to accidents in other countries. - The RB's role is adequately documented and communicated to all agencies taking part in the response to a nuclear or radiological emergency. - Inspectors check that threat assessments for NPPs have been undertaken in accordance with national requirements and that up-to-date assessments have been used as the basis for developing emergency plans for

  18. Pipework inspection apparatus

    International Nuclear Information System (INIS)

    Wrigglesworth, K.J.; Knowles, J.F.

    1987-01-01

    The patent concerns a pipework inspection apparatus, which is capable of negotiating bends in pipework. The apparatus comprises a TV camera system, which contains an optical section and an electronics section, which are connected by a flexible coupling. The system can be pulled or pushed along the bore of the pipework. (U.K.)

  19. Fuel assembly inspection device

    International Nuclear Information System (INIS)

    Yaginuma, Yoshitaka

    1998-01-01

    The present invention provides a device suitable to inspect appearance of fuel assemblies by photographing the appearance of fuel assemblies. Namely, the inspection device of the present invention measures bowing of fuel assembly or each of fuel rods or both of them based on the partially photographed images of fuel assembly. In this case, there is disposed a means which flashily projects images in the form of horizontal line from a direction intersecting obliquely relative to a horizontal cross section of the fuel assembly. A first image processing means separates the projected image pictures including projected images and calculates bowing. A second image processing means replaces the projected image pictures of the projected images based on projected images just before and after the photographing. Then, images for the measurement of bowing and images for inspection can be obtained simultaneously. As a result, the time required for the photographing can be shortened, the time for inspection can be shortened and an effect of preventing deterioration of photographing means by radiation rays can be provided. (I.S.)

  20. Unannounced inspection for integrated safeguards: A theoretical perspective

    International Nuclear Information System (INIS)

    Canty, M.J.; Avenhaus, R.

    2001-01-01

    Full text: The application of a safeguards verification regime based on existing agreements under INFCIRC/153 and on the Additional Protocol, INFCIRC/540, has the potential to allow the International Atomic Energy Agency (IAEA) to relax its traditional facility and material-oriented inspection procedures. The relaxation will take into account the IAEA's enhanced access to information as well as complementary access to locations gained through the application of extended measures foreseen under the Additional Protocol. It will reflect the associated confidence achieved at the State level. It is generally agreed that such a trade-off between the new strengthening measures and the traditional measures is reasonable and desirable, both from the point of view of the inspected State, which would like to receive tangible credit for providing increased openness and transparency in its peaceful nuclear activities, and from the viewpoint of the IAEA, which must apportion its limited inspection resources efficiently. An often-discussed proposal to reduce routine inspection effort while maintaining safeguards effectiveness is to replace scheduled interim inspections with a smaller number of random, unannounced visits. Intuitively, the unpredictability aspect is appealing, as it places the potential diverter in a permanent state of uncertainty. There are also some disadvantages, however, such as the difficulty of planning and implementing truly random inspections and the burden experienced by facility operators obliged to accommodate them. An objective evaluation of a randomized inspection regime vis-a-vis conventional routine inspections requires an objective measure of effectiveness and a means of optimizing that measure - in other words a theoretical framework for analyzing verification problems. In our paper we provide such a framework by quantifying the notion of timely detection and by treating the problem consistently a strategic one. We present a series of models which

  1. Devices for the contamination containment employees in the steam generator inspection; Dispositivo para confinamiento de la contaminacion empleados en la inspeccion de generadores de vapor

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Bueno, A.; Largo Izquierdo, P.; Calleja Rubio, J. A.

    2010-07-01

    The process of induced current inspection of the tubes of the steam generator is a typical programmed inspections at each refueling outages of pressurized water in nuclear power plants. components inspection being quite active, interested in the program of continuous improvement, further optimize the inspection system.

  2. Mechanized inspection of steam generator components during manufacture

    International Nuclear Information System (INIS)

    Otte, H.-J.; Leupoldt, K.; Meister, W.

    2009-01-01

    the capability of automatic optimizing the inspection speed thus reducing the inspection time to a minimum. Full A-scan (HF information), peak and gate data acquisition can be selected. After performing the inspection resp. the inspection sequences the inspector can check the results before loading them to the network of the manufacturer for final storage on the server. If defects were found these defects can be automatically listed in an indication table providing all information necessary (location, size) to decide on the further procedure. (author)

  3. Risk-based technical specifications program: Site interview results

    International Nuclear Information System (INIS)

    Andre, G.R.; Baker, A.J.; Johnson, R.L.

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs

  4. Consideration regarding the scheduling of unannounced or randomized inspections

    International Nuclear Information System (INIS)

    Sanborn, J.

    2001-01-01

    Full text: Randomized inspection strategies, including unannounced, short notice, or randomly selected scheduled inspections can play an useful role in integrated safeguards by allowing a reduction in the number of inspections without sacrificing coverage of diversion scenarios. The Agency and member states have proposed such strategies as important elements of integrated safeguards proposals at reactors as well as bulk handling facilities. The Agency, however, has limited experience with such inspections, and a number of issues need to be addressed before effective implementation can occur; how these issues are resolved will determine how effective the inspections will be. This paper focuses on the question of how to determine the timing of such inspections. It is pointed out that there are a large number of variants of the idea of 'randomized inspection,' and that each option will have advantages and disadvantages from the points of view of the operator, the logistics of inspection scheduling, and the capabilities for detection. The method chosen should depend on the type of scenarios that the Agency wishes to detect. The mathematically purest form of randomized schedule will have broad theoretical applicability, but may prove more difficult to put into practice, and may be unnecessary, or even sub-optimal, depending on the inspection objective. On the other hand, each restriction on inspection that provides the operator with information on when the inspection will occur must be taken into account when assessing detection probability. The paper reviews a number of scheduling approaches in the context of different objectives and considers effectiveness, operational impact, and practicality. (author)

  5. Inspection of austenitic welds with ultrasonic phased array technology

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, A.; Fernandez, F. [Tecnatom (Spain); Dutruc, R.; Ferriere, R. [Metalscan (France)

    2011-07-01

    This series of slides presents the use of ultrasonic phased array technology in the inspection of austenitic welds. The inspection from outside surface (the inspection is performed in contact using wedges to couple the probe to the outer surface of the component) shows that longitudinal wave is the most adequate for perpendicular scans and transversal ultrasonic wave is the most adequate for parallel scans. Detection and length sizing are performed optimally in perpendicular scans. The inspection from inside surface shows: -) Good results in the detection of defects (Sizing has met the requirements imposed by the Authority of the Russian Federation); -) The new design of the mechanical equipment and of the numerous ultrasonic beams refracted by the array probes has increased the volume inspected. The design of the mechanical equipment has also allowed new areas to be inspected (example a piping weld that was not accessible from the outer surface; -) The ultrasonic procedure and Inspection System developed have been validated by the Authority of the Russian Federation. Phase array technique supplies solutions to solve accessibility concerns and improve the ultrasonic inspections of nuclear components

  6. Risk-based rules for crane safety systems

    Energy Technology Data Exchange (ETDEWEB)

    Ruud, Stian [Section for Control Systems, DNV Maritime, 1322 Hovik (Norway)], E-mail: Stian.Ruud@dnv.com; Mikkelsen, Age [Section for Lifting Appliances, DNV Maritime, 1322 Hovik (Norway)], E-mail: Age.Mikkelsen@dnv.com

    2008-09-15

    The International Maritime Organisation (IMO) has recommended a method called formal safety assessment (FSA) for future development of rules and regulations. The FSA method has been applied in a pilot research project for development of risk-based rules and functional requirements for systems and components for offshore crane systems. This paper reports some developments in the project. A method for estimating target reliability for the risk-control options (safety functions) by means of the cost/benefit decision criterion has been developed in the project and is presented in this paper. Finally, a structure for risk-based rules is proposed and presented.

  7. Risk-based rules for crane safety systems

    International Nuclear Information System (INIS)

    Ruud, Stian; Mikkelsen, Age

    2008-01-01

    The International Maritime Organisation (IMO) has recommended a method called formal safety assessment (FSA) for future development of rules and regulations. The FSA method has been applied in a pilot research project for development of risk-based rules and functional requirements for systems and components for offshore crane systems. This paper reports some developments in the project. A method for estimating target reliability for the risk-control options (safety functions) by means of the cost/benefit decision criterion has been developed in the project and is presented in this paper. Finally, a structure for risk-based rules is proposed and presented

  8. Practical risk-based decision making: Good decisions made efficiently

    International Nuclear Information System (INIS)

    Haire, M.J.; Guthrie, V.; Walker, D.; Singer, R.

    1995-01-01

    The Robotics and Process Systems Division of the Oak Ridge National Laboratory and the Westinghouse Savannah River Company have teamed with JBF Associates, Inc. to address risk-based robotic planning. The objective of the project is to provide systematic, risk-based relative comparisons of competing alternatives for solving clean-up problems at DOE facilities. This paper presents the methodology developed, describes the software developed to efficiently apply the methodology, and discusses the results of initial applications for DOE. The paper also addresses current work in applying the approach to problems in other industries (including an example from the hydrocarbon processing industry)

  9. Promotion of technical harmonisation on risk-based decision making

    International Nuclear Information System (INIS)

    Kirchsteiger, Christian; Cojazzi, Giacomo

    2000-01-01

    The EC-JRC International Workshop on Promotion of Technical Harmonisation on Risk-Based Decision Making, held at Stresa and Ispra, Italy, 22-25 May 2000, was an experts meeting to discuss the possible need of developing an internationally accepted generic 'standard' for risk-based decision making.This paper briefly describes the workshop background, its organisation and summarises its main results and conclusions; it reflects the personal opinions of the authors and in no way commits the European Commission. (author)

  10. A Simulation Tool for Ultrasonic Inspection

    Energy Technology Data Exchange (ETDEWEB)

    Krishnamurthy, Adarsh; Mohan, K. V.; Karthikeyan, Soumya; Krishnamurthy, C. V.; Balasubramaniam, Krishnan [Indian Institute of Technology, Tamil Nadu (India)

    2006-06-15

    A simulation program SIMULTSONIC is under development at CNDE to help determine and/or help optimize ultrasonic probe locations for inspection of complex components. SIMULTSONIC provides a ray-trace based assessment for immersion and contact modes of inspection. The code written in Visual C++ operating in Microsoft Windows environment provides an interactive user interface. In this paper, a description of the various features of SIMULTSONIC is given followed by examples illustrating the capability of SIMULTSONIC to deal with inspection of canonical objects such as pipes. In particular, the use of SIMULTSONIC in the inspection of very thin-walled pipes (with 450 urn wall thickness) is described. Ray trace based assessment was done using SIMULTSONIC to determine the standoff distance and the angle of oblique incidence for an immersion mode focused transducer. A 3-cycle Hanning window pulse was chosen for simulations. Experiments were carried out to validate the simulations. The A-scans and the associated B-Scan images obtained through simulations show good correlation with experimental results, both with the arrival time of the signal as well as with the signal amplitudes

  11. The maintenance optimization of structural components in nuclear power plants

    International Nuclear Information System (INIS)

    Bryla, P.; Ardorino, F.; Aufort, P.; Jacquot, J.P.; Magne, L.; Pitner, P.; Verite, B.; Villain, B.; Monnier, B.

    1997-10-01

    An optimization process, called 'OMF-Structures', is developed by Electricite de France (EDF) in order to extend the current 'OMF' Reliability Centered Maintenance to piping structural components. The Auxiliary Feedwater System of a 900 MW French nuclear plant has been studied in order to lay the foundations of the method. This paper presents the currently proposed principles of the process. The principles of the OMF-Structures process include 'Risk-Based Inspection' concepts within an RCM process. Two main phases are identified: The purpose of the first phase is to select the risk-significant failure modes and associated elements. This phase consists of two major steps: potential consequences evaluation and reliability performance evaluation. The second phase consists of the definition of preventive maintenance programs for piping elements that are associated with risk-significant failure modes. (author)

  12. Overview of the software inspection process

    Energy Technology Data Exchange (ETDEWEB)

    Lane, G.L.; Dabbs, R. [Sandia National Labs., Albuquerque, NM (United States)

    1997-11-01

    This tutorial introduces attendees to the Inspection Process and teaches them how to organize and participate in a software inspection. The tutorial advocates the benefits of inspections and encourages attendees to socialize the inspection process in their organizations.

  13. Waste Inspection Tomography (WIT)

    International Nuclear Information System (INIS)

    Bernardi, R.T.

    1995-01-01

    Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU. The mobile feature of WIT allows inspection technologies to be brought to the nuclear waste drum storage site without the need to relocate drums for safe, rapid, and cost-effective characterization of regulated nuclear waste. The combination of these WIT characterization modalities provides the inspector with an unprecedented ability to non-invasively characterize the regulated contents of waste drums as large as 110 gallons, weighing up to 1,600 pounds. Any objects that fit within these size and weight restrictions can also be inspected on WIT, such as smaller waste bags and drums that are five and thirty-five gallons

  14. Recurrent inspection of tubes

    International Nuclear Information System (INIS)

    Andersson, S.

    1984-01-01

    Recommendations concerning the selection of areas for the inspection of tubes have been outlined. The aim is to focus the control on the regions which are important for the safety and where damage is supposed to take place. The number of zones will depend on the risk factors as judged by experts. The localizing will be based upon probable damaging mechanisms. A certain number of areas should be chosen at random. (G.B.)

  15. Regulatory inspection in Spain

    International Nuclear Information System (INIS)

    Alvarez de Buergo, L.

    1977-01-01

    The 1964 Act on Nuclear Energy lays down that the Junta de Energia Nuclear is responsible for assessing the hazards of and inspecting nuclear power plants as well as for the transport of nuclear fuel for these plants. The Junta de Energia Nuclear has a specialised service, the Nuclear Safety Department in charge of performing these duties. Experience acquired from work in this field is analysed in this paper. (NEA) [fr

  16. Infrared microscope inspection apparatus

    Science.gov (United States)

    Forman, Steven E.; Caunt, James W.

    1985-02-26

    Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface.

  17. OSE inspections: A different perspective

    International Nuclear Information System (INIS)

    Ware, J.H.

    1987-01-01

    The Office of Security Evaluation (OSE) is a staff activity of the Assistant Secretary for Defense Programs (ASDP) and is responsible for the conduct of an inspection and evaluation program. The OSE Inspection Division conducts assessments of the effectiveness of Department of Energy (DOE) Safeguards and Security policies and protection programs. The inspections are conducted by OSE Inspectors and Support Specialists. Prior to the author's participation in the inspection of the San Francisco Operations Office, a DOE Field Office employee had never played an active role in an OSE Inspection of another field office. This paper discloses his experience as an OSE Inspector

  18. Оn the issue of setting priorities in the organization of risk-based supervision over the safety of consumer products traded on the common economic space of Russia, Belarus and Kazakhstan

    Directory of Open Access Journals (Sweden)

    А.Yu. Popova

    2015-09-01

    Full Text Available Significant volumes of mutual trade between the countries of the Eurasian Economic Union, combined with the urgency of protecting the population against the risks of negative impacts on the health products are aiming to optimize the supervision of the products traded in the market. One of the ways to optimize is the transition to a risk-based model of health service activities and choice of products for top-priority (priority control. The approaches to the selection of priorities are offered, based on the account of the product use, consumer contingent specificity, known types of hazards, results of inspection and enforcement activities. It was found that the priority products exported by EASE member countries on the common market and forming potentially the greatest risk of harm to the health of consumers may include: dairy products; bird eggs (FEACN group 04; fats and oils of animal or vegetable origin and their cleavage products; prepared edible fats; waxes of animal or vegetable origin (FEACN group 15; sugar and sugar confectionery (FEACN group 17; meat, fish or crustaceans, mollusks or other aquatic invertebrates (FEACN group 16; alcoholic and soft drinks and so on. (FEACN group 22; vegetables, roots and tubers (FEACN group 07; toys, games and sports equipment (FEACN group 95. In relation to these groups of products the priority study of the risk profile required, as well as the development of algorithms and regulations of the supervisory and control measures and improvement of laboratory support methods.

  19. Pressurized water reactor inspection procedures

    International Nuclear Information System (INIS)

    Heinrich, D.; Mueller, G.; Otte, H.J.; Roth, W.

    1998-01-01

    Inspections of the reactor pressure vessels of pressurized water reactors (PWR) so far used to be carried out with different central mast manipulators. For technical reasons, parallel inspections of two manipulators alongside work on the refueling cavity, so as to reduce the time spent on the critical path in a revision outage, are not possible. Efforts made to minimize the inspection time required with one manipulator have been successful, but their effects are limited. Major reductions in inspection time can be achieved only if inspections are run with two manipulators in parallel. The decentralized manipulator built by GEC Alsthom Energie and so far emmployed in boiling water reactors in the USA, Spain, Switzerland and Japan allows two systems to be used in parallel, thus reducing the time required for standard inspection of a pressure vessel from some six days to three days. These savings of approximately three days are made possible without any compromises in terms of positioning by rail-bound systems. During inspection, the reactor refueling cavity is available for other revision work without any restrictions. The manipulator can be used equally well for inspecting standard PWR, PWR with a thermal shield, for inspecting the land between in-core instrumentation nozzles, BWR with and without jet pumps (complementary inspection), and for inspecting core support shrouds. (orig.) [de

  20. Risk-Based Decision Making for Deterioration Processes Using POMDP

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard

    2015-01-01

    This paper proposes a method for risk-based decision making for maintenance of deteriorating components, based on the partially observable Markov decision process (POMDP). Unlike most methods, the decision polices do not need to be stationary and can vary according to seasons and near the end...

  1. 6 CFR 27.230 - Risk-based performance standards.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Risk-based performance standards. 27.230 Section 27.230 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY... the facility and that discourages abuse through established disciplinary measures; (4) Deter, Detect...

  2. Risk-based audit selection of dairy farms

    NARCIS (Netherlands)

    Asseldonk, van M.A.P.M.; Velthuis, A.G.J.

    2014-01-01

    Dairy farms are audited in the Netherlands on numerous process standards. Each farm is audited once every 2 years. Increasing demands for cost-effectiveness in farm audits can be met by introducing risk-based principles. This implies targeting subpopulations with a higher risk of poor process

  3. Develop risk-based procurement management tools for SMEs

    NARCIS (Netherlands)

    Staal, Anne; Hagelaar, Geoffrey; Walhof, Gert; Holman, Richard

    2016-01-01

    This paper provides guidance for developing risk-based management tools to improve the procurement (purchasing) performance of SMEs. Extant academic literature only offers little support on developing such tools and does not consider the wide variety of SMEs. The paper defines a procurement tool for

  4. 12 CFR 932.3 - Risk-based capital requirement.

    Science.gov (United States)

    2010-01-01

    ... credit risk capital requirement, its market risk capital requirement, and its operations risk capital... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk-based capital requirement. 932.3 Section 932.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND...

  5. 76 FR 1889 - Risk-Based Capital Guidelines: Market Risk

    Science.gov (United States)

    2011-01-11

    ... ``three-pillar'' framework that includes (i) risk-based capital requirements for credit risk, market risk... incremental risk capital requirement to capture default and credit quality migration risk for non... (advanced approaches rules) (collectively, the credit risk capital rules) \\8\\ by requiring any bank subject...

  6. 77 FR 53059 - Risk-Based Capital Guidelines: Market Risk

    Science.gov (United States)

    2012-08-30

    ...'' framework that includes (1) Risk-based capital requirements for credit risk, market risk, and operational... default and credit quality migration risk for non-securitization credit products. With respect to... securitization positions, the revisions assign a specific risk- weighting factor based on the credit rating of a...

  7. Risk-Based Operation and Maintenance Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    This paper describes how risk-based decision making can be used for maintenance planning of components exposed to degradation such as fatigue in offshore wind turbines. In fatigue models, large epistemic uncertainties are usually present. These can be reduced if monitoring results are used to upd...

  8. Structural assessment procedure of corroding submarine gas pipelines using on-line inspection data

    International Nuclear Information System (INIS)

    Nordin Yahaya

    2000-01-01

    This paper presents 'the alternative approach of overall procedure in the assessment of corroded pipelines using data gathered by the on-line inspection device. The methodology adopts a generalised approach of analysing pipeline inspection data and a prediction of the structural reliability due to the deteriorating corrosion environment. The whole assessment methodology is divided into four separate stages; 1 to IV. Stages 1 and 11 are the initial procedure prior to the actual analysis of the inspection data. The scope of this paper is concerted into the procedure to be taken in Stage 111 where the stage is sub-divided into 3 major steps; Part A, B and C. These procedures are Part A (statistical and probabilistic analysis of the inspection data) and Part B (the application of extreme value statistics) and C (reliability assessment). Stage IV (risk assessment) is the final step in the procedure where the consequences of failure are evaluated. The proposed risk-based assessment procedure is more systematic and reliable to account for a huge amount of collected data usually obtained in an on-line inspection using the intelligent devices. The outcomes of this risk-based methodology can be very useful in the decision-making process by the operation management. This in turn will produce an efficient inspection, repair and maintenance program and enhanced the optimised return in investment. (author)

  9. SmartInspect: Smart Contract Inspection Technical Report

    OpenAIRE

    Bragagnolo , Santiago; Rocha , Henrique ,; Denker , Marcus; Ducasse , Stéphane

    2017-01-01

    Smart contracts are embedded procedures stored with the data they act upon. Debugging deployed Smart Contracts is a difficult task since once deployed, the code cannot be reexecuted and inspecting a simple attribute is not easily possible because data is encoded. In this technical report, we present SmartInspect to address the lack of inspectability of a deployed contract. Our solution analyses the contract state by using decompilation techniques and a mirror-based architecture to represent t...

  10. Shell Inspection History and Current CMM Inspection Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-26

    The following report provides a review of past and current CMM Shell Inspection efforts. Calibration of the Sheffield rotary contour gauge has expired and the primary inspector, Matthew Naranjo, has retired. Efforts within the Inspection team are transitioning from maintaining and training new inspectors on Sheffield to off-the-shelf CMM technology. Although inspection of a shell has many requirements, the scope of the data presented in this report focuses on the inner contour, outer contour, radial wall thickness and mass comparisons.

  11. Safeguards management inspection procedures

    International Nuclear Information System (INIS)

    Barth, M.J.; Dunn, D.R.

    1984-08-01

    The objective of this inspection module is to independently assess the contributions of licensee management to overall safeguards systems performance. The inspector accomplishes this objective by comparing the licensee's safeguards management to both the 10 CFR, parts 70 and 73, requirements and to generally accepted management practices. The vehicle by which this comparison is to be made consists of assessment questions and key issues which point the inspector to areas of primary concern to the NRC and which raise additional issues for the purpose of exposing management ineffectiveness. Further insight into management effectiveness is obtained through those assessment questions specifically directed toward the licensee's safeguards system performance. If the quality of the safeguards is poor, then the inspector should strongly suspect that management's role is ineffective and should attempt to determine management's influence (or lack thereof) on the underlying safeguards deficiencies. (The converse is not necessarily true, however.) The assessment questions in essence provide an opportunity for the inspector to identify, to single out, and to probe further, questionable management practices. Specific issues, circumstances, and concerns which point to questionable or inappropriate practices should be explicitly identified and referenced against the CFR and the assessment questions. The inspection report should also explain why the inspector feels certain management practices are poor, counter to the CFR, and/or point to ineffecive management. Concurrent with documenting the inspection results, the inspector should provide recommendations for alleviating observed management practices that are detrimental to effective safeguards. The recommendations could include: specific changes in the practices of the licensee, followup procedures on the part of NRC, and proposed license changes

  12. Laser Safety Inspection Criteria

    International Nuclear Information System (INIS)

    Barat, K.

    2005-01-01

    A responsibility of the Laser Safety Officer (LSO) is to perform laser audits. The American National Standard Z136.1 Safe Use of Lasers references this requirement through several sections. One such reference is Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''. The composition, frequency and rigor of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms It is common for audit findings from one inspector or inspection to the next to vary even when reviewing the same material. How often has one heard a comment, ''well this area has been inspected several times over the years and no one ever said this or that was a problem before''. A great number of audit items, and therefore findings, are subjective because they are based on the experience and interest of the auditor to particular items on the checklist. Beam block usage, to one set of eyes might be completely adequate, while to another, inadequate. In order to provide consistency, the Laser Safety Office of the National Ignition Facility Directorate has established criteria for a number of items found on the typical laser safety audit form. The criteria are distributed to laser users. It serves two broad purposes; first, it gives the user an expectation of what will be reviewed by an auditor. Second, it is an opportunity to explain audit items to the laser user and thus the reasons for some of these items, such as labelling of beam blocks

  13. Risk-Based Predictive Maintenance for Safety-Critical Systems by Using Probabilistic Inference

    Directory of Open Access Journals (Sweden)

    Tianhua Xu

    2013-01-01

    Full Text Available Risk-based maintenance (RBM aims to improve maintenance planning and decision making by reducing the probability and consequences of failure of equipment. A new predictive maintenance strategy that integrates dynamic evolution model and risk assessment is proposed which can be used to calculate the optimal maintenance time with minimal cost and safety constraints. The dynamic evolution model provides qualified risks by using probabilistic inference with bucket elimination and gives the prospective degradation trend of a complex system. Based on the degradation trend, an optimal maintenance time can be determined by minimizing the expected maintenance cost per time unit. The effectiveness of the proposed method is validated and demonstrated by a collision accident of high-speed trains with obstacles in the presence of safety and cost constrains.

  14. Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    , and to sequential optimal decision making on planning of OM taking into account new information. Deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty. Observations of the degree of damage can increase the reliability of predictions, especially......For offshore wind turbines, costs to operation and maintenance (OM) are substantial. This paper describes a risk-based life cycle approach for optimal planning of OM. The approach is based on pre-posterior Bayesian decision theory, and can be used both to overall, initial planning of OM...... in connection with condition-based maintenance. The approach can be used for gearboxes, generators, fatigue cracks, corrosion, etc. This paper also describes how probabilistic indicators can be used to quantify indirect information about the damage state for critical components, e.g. gearboxes....

  15. Acoustic inspection device

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, Aaron A.; Burghard, Brion J.; Skorpik, James R.; Pappas, Richard A.; Mullen, O. Dennis; Samuel, Todd J.; Reid, Larry D.; Harris, Joe C.; Valencia, Juan D.; Smalley, Jonathan T.; Shepard, Chester L.; Taylor, Theodore T.

    2005-09-06

    An ultrasound inspection apparatus particularly adapted to examine containers (sealed or unsealed) containing a liquid or solid bulk material. The apparatus has an overall configuration of a hand held pistol with a front transducer contact surface that is positioned against a front wall of the container. An ultrasound pulse is transmitted from the apparatus to be reflected from a back wall of a container being investigated. The received echo pulse is converted to a digital waveform. The waveform is analyzed relative to temperature, travel distance of the pulse(s), and time of travel to ascertain characteristics of the liquid or other materials and to provide identification of the same.

  16. Inspection of internal tank welds using the ACFM inspection method

    International Nuclear Information System (INIS)

    Topp, D.A.; Lugg, M.C.

    2009-01-01

    The paper describes recent developments of the ACFM technique and describes several case studies where ACFM has been used to inspect the internal plate welds on large steel storage tanks in refineries. For weld inspection, conventional methods such as magnetic particle inspection or vacuum box testing are generally used. This paper presents comparisons of the results from ACFM with those from the conventional methods, from which conclusions are drawn as to the benefits this technique offers in terms of cost, time savings and inspection reliability. (author)

  17. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  18. On risk-based operation and maintenance of offshore wind turbine components

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study...... of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect...

  19. Endoscopic inspection of steam turbines

    International Nuclear Information System (INIS)

    Maliniemi, H.; Muukka, E.

    1990-01-01

    For over ten years, Imatran Voima Oy (IVO) has developed, complementary inspection methods for steam turbine condition monitoring, which can be applied both during operation and shutdown. One important method used periodically during outages is endoscopic inspection. The inspection is based on the method where the internal parts of the turbine is inspected through access borings with endoscope and where the magnified figures of the internal parts is seen on video screen. To improve inspection assurance, an image-processing based pattern recognition method for cracks has been developed for the endoscopic inspection of turbine blades. It is based on the deduction conditions derived from the crack shape. The computer gives an alarm of a crack detection and prints a simulated image of the crack, which is then checked manually

  20. A survey on inspecting structures using robotic systems

    Directory of Open Access Journals (Sweden)

    Randa Almadhoun

    2016-11-01

    Full Text Available Advancements in robotics and autonomous systems are being deployed nowadays in many application domains such as search and rescue, industrial automation, domestic services and healthcare. These systems are developed to tackle tasks in some of the most challenging, labour intensive and dangerous environments. Inspecting structures (e.g. bridges, buildings, ships, wind turbines and aircrafts is considered a hard task for humans to perform and of critical importance since missing any details could affect the structure’s performance and integrity. Additionally, structure inspection is time and resource intensive and should be performed as efficiently and accurately as possible. Inspecting various structures has been reported in the literature using different robotic platforms to: inspect difficult to reach areas and detect various types of faults and anomalies. Typically, inspection missions involve performing three main tasks: coverage path planning, shape, model or surface reconstruction and the actual inspection of the structure. Coverage path planning ensures the generation of an optimized path that guarantees the complete coverage of the structure of interest in order to gather highly accurate information to be used for shape/model reconstruction. This article aims to provide an overview of the recent work and breakthroughs in the field of coverage path planning and model reconstruction, with focus on 3D reconstruction, for the purpose of robotic inspection.

  1. Waste inspection tomography (WIT)

    Energy Technology Data Exchange (ETDEWEB)

    Bernardi, R.T. [Bio-Imaging Research, Inc., Lincolnshire, IL (United States)

    1995-10-01

    Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting, isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU.

  2. Waste inspection tomography (WIT)

    International Nuclear Information System (INIS)

    Bernardi, R.T.

    1995-01-01

    Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting, isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU

  3. Inspections - a cost effective approach

    International Nuclear Information System (INIS)

    Joseph, C.

    1981-01-01

    This paper describes a cost effective approach for inspections of Computerized Nuclear Materials Control and Accounting Systems (CNMCAS). Highlighted is the capability to conduct an inspection program via portable telephone terminals from off-site locations. The program can be applied to various materials management functions including materials control, quality assurance, and materials accounting. The system is designed to facilitate inspections by both external and internal groups

  4. Designing and evaluating risk-based surveillance systems

    DEFF Research Database (Denmark)

    Willeberg, Preben; Nielsen, Liza Rosenbaum; Salman, Mo

    2012-01-01

    Risk-based surveillance systems reveal occurrence of disease or infection in a sample of population units, which are selected on the basis of risk factors for the condition under study. The purpose of such systems for supporting practical animal disease policy formulations and management decisions...... with prudent use of resources while maintaining acceptable system performance. High-risk category units are selected for testing by identification of the presence of specific high-risk factor(s), while disregarding other factors that might also influence the risk. On this basis we argue that the most...... applicable risk estimate for use in designing and evaluating a risk-based surveillance system would be a crude (unadjusted) relative risk, odds ratio or apparent prevalence. Risk estimates found in the published literature, however, are often the results of multivariable analyses implicitly adjusting...

  5. Risk-based decision making for terrorism applications.

    Science.gov (United States)

    Dillon, Robin L; Liebe, Robert M; Bestafka, Thomas

    2009-03-01

    This article describes the anti-terrorism risk-based decision aid (ARDA), a risk-based decision-making approach for prioritizing anti-terrorism measures. The ARDA model was developed as part of a larger effort to assess investments for protecting U.S. Navy assets at risk and determine whether the most effective anti-terrorism alternatives are being used to reduce the risk to the facilities and war-fighting assets. With ARDA and some support from subject matter experts, we examine thousands of scenarios composed of 15 attack modes against 160 facility types on two installations and hundreds of portfolios of 22 mitigation alternatives. ARDA uses multiattribute utility theory to solve some of the commonly identified challenges in security risk analysis. This article describes the process and documents lessons learned from applying the ARDA model for this application.

  6. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  7. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  8. Experience on inspection at PFPF

    International Nuclear Information System (INIS)

    Aoki, I.; Yamamoto, Y.; Takahashi, Saburo; Ooshima, Hirofumi; Kuniyasu, Kazufusa.

    1993-01-01

    In order to reduce a personal radiation exposure, Plutonium Fuel Production Facility (PFPF) introduced an automated MOX fabrication technology. Safeguards system for the PFPF was designed and installed so as to be compatible with automated process operation as much as possible. Introduction of these system in PFPF made possible to do the inspection measurements with unattended mode and Near Real Time Material Accountancy (NRTA), consequently inspection has been carrying out effectively and efficiently. This paper describes the new Inspection activities as a comparison with old Inspection activities based on our experience. (author)

  9. PWR vessel inspection performance improvements

    International Nuclear Information System (INIS)

    Blair Fairbrother, D.; Bodson, Francis

    1998-01-01

    A compact robot for ultrasonic inspection of reactor vessels has been developed that reduces setup logistics and schedule time for mandatory code inspections. Rather than installing a large structure to access the entire weld inspection area from its flange attachment, the compact robot examines welds in overlapping patches from a suction cup anchor to the shell wall. The compact robot size allows two robots to be operated in the vessel simultaneously. This significantly reduces the time required to complete the inspection. Experience to date indicates that time for vessel examinations can be reduced to fewer than four days. (author)

  10. Risk-based configuration control system: Analysis and approaches

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.; Lofgren, E.V.

    1989-01-01

    This paper presents an evaluation of the configuration risks associated with the operation of a nuclear power plant and the approaches to control these risks using risk-based configuration control considerations. In that context, the actual and maximum potential configuration risks at a plant are analyzed and the alternative types criteria for a risk-based configuration control systems are described. The risk-based configuration calculations which are studied here focus on the core-melt frequency impacts from given plant configurations. By calculating the core-melt frequency for given configurations, the configurations which cause large core-melt frequency increases can be identified and controlled. The duration time in which the configuration can exist can then be limited or the core-melt frequency level associated with the configuration can be reduced by various actions. Furthermore, maintenances and tests can be scheduled to avoid the configurations which cause large core-melt frequency increases. Present technical specifications do not control many of these configurations which can cause large core-melt frequency increases but instead focus on many risk-unimportant allowed outage times. Hence, risk-based configuration management can be effectively used to reduce core-melt frequency associated risks at a plant and at the same time can provide flexibility in plant operation. The alternative strategies for controlling the core-melt frequency and other risk contributions include: (1) controlling the increased risk level which is associated with the configuration; (2) controlling the individual configuration risk which is associated with a given duration of a configuration; (3) controlling the time period configuration risk from configurations which occur in a time period

  11. Toward risk-based control of nuclear power plant configurations

    International Nuclear Information System (INIS)

    Samanta, P.K.; Veseley, W.E.; Kim, I.S.

    1992-01-01

    This paper presents an evaluation of the configuration risks associated with the operation of a nuclear power plant and the approaches to control these risks using risk-based configuration control considerations. In that context, the actual and maximum potential configuration risks at a plant are analyzed and the alternative types criteria for a risk-based configuration control systems are described. The risk-based configuration calculations which are studied here focus on the core-melt frequency impacts from given plant configurations, the configurations which cause large core-melt frequency increases can be identified and controlled. The duration time in which the configuration can exist can then be limited or the core-melt frequency level associated with the configuration can be reduced by various actions. Futhermore, maintenances and tests can be scheduled to avoid the configurations which cause large core-melt frequency increases. Present technical specifications do not control many of these configurations which can cause large core-melt frequency increases but instead focus on many risk-unimportant allowed outage times. Hence, risk-based configuration management can be effectively used to reduce core-melt frequency associated risks at a plant and at the same time can provide flexibility in plant operation. The alternative strategies for controlling the core-melt frequency and other risk contributions include: (1) controlling the increased risk level which is associated with the configuration; (2) controlling the individual configuration risk which is associated with a given duration of a configuration; (3) controlling the time period configuration risk from configurations which occur in a time period. (orig.)

  12. Strategies and criteria for risk-based configuration control

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1991-01-01

    A configuration, as used here, is a set of component operability or statuses that define the state of a nuclear power plant. Risk-based configuration control is the management of component configurations using a risk perspective to control risk and assure safety. If the component configurations that have high risk implications do not occur then the risk from the operation of nuclear power plants would be minimal. The control of component configurations, i.e., the management of component statuses, so that the risk from components being unavailable is minimized, becomes difficult because the status of a standby safety system component is often not apparent unless it is tested. In this paper, we discuss the strategies and criteria for risk-based configuration control in nuclear power plants. In developing these strategies and criteria, the primary objective is to obtain more direct risk control but the added benefit is the effective use of plant resources. Implementation of such approaches can result in replacement/modification of parts of Technical Specifications. Specifically, the risk impact or safety impact of a configuration depends upon four factors: (1) The configuration components which are simultaneously down (i.e., inoperable); (2) the backup components which are known to be up (i.e., operable); (3) the duration of time the configuration exists (the outage time); and (4) the frequency at which the configuration occurs. Risk-based configuration control involves managing these factors using risk analyses and risk insights. In this paper, we discuss each of the factors and illustrate how they can be controlled. The information and the tools needed in implementing configuration control are also discussed. The risk-based calculation requirements in achieving the control are also delineated. 4 refs., 4 figs., 1 tab

  13. Quantification of Technology Innovation Usinga Risk-Based Framework

    OpenAIRE

    Gerard E. Sleefe

    2010-01-01

    There is significant interest in achieving technology innovation through new product development activities. It is recognized, however, that traditional project management practices focused only on performance, cost, and schedule attributes, can often lead to risk mitigation strategies that limit new technology innovation. In this paper, a new approach is proposed for formally managing and quantifying technology innovation. This approach uses a risk-based framework that s...

  14. Enhancing the effectiveness of IST through risk-based techniques

    Energy Technology Data Exchange (ETDEWEB)

    Floyd, S.D.

    1996-12-01

    Current IST requirements were developed mainly through deterministic-based methods. While this approach has resulted in an adequate level of safety and reliability for pumps and valves, insights from probabilistic safety assessments suggest a better safety focus can be achieved at lower costs. That is, some high safety impact pumps and valves are currently not tested under the IST program and should be added, while low safety impact valves could be tested at significantly greater intervals than allowed by the current IST program. The nuclear utility industry, through the Nuclear Energy Institute (NEI), has developed a draft guideline for applying risk-based techniques to focus testing on those pumps and valves with a high safety impact while reducing test frequencies on low safety impact pumps and valves. The guideline is being validated through an industry pilot application program that is being reviewed by the U.S. Nuclear Regulatory Commission. NEI and the ASME maintain a dialogue on the two groups` activities related to risk-based IST. The presenter will provide an overview of the NEI guideline, discuss the methodological approach for applying risk-based technology to IST and provide the status of the industry pilot plant effort.

  15. A risk-based auditing process for pharmaceutical manufacturers.

    Science.gov (United States)

    Vargo, Susan; Dana, Bob; Rangavajhula, Vijaya; Rönninger, Stephan

    2014-01-01

    The purpose of this article is to share ideas on developing a risk-based model for the scheduling of audits (both internal and external). Audits are a key element of a manufacturer's quality system and provide an independent means of evaluating the manufacturer's or the supplier/vendor's compliance status. Suggestions for risk-based scheduling approaches are discussed in the article. Pharmaceutical manufacturers are required to establish and implement a quality system. The quality system is an organizational structure defining responsibilities, procedures, processes, and resources that the manufacturer has established to ensure quality throughout the manufacturing process. Audits are a component of the manufacturer's quality system and provide a systematic and an independent means of evaluating the manufacturer's overall quality system and compliance status. Audits are performed at defined intervals for a specified duration. The intention of the audit process is to focus on key areas within the quality system and may not cover all relevant areas during each audit. In this article, the authors provide suggestions for risk-based scheduling approaches to aid pharmaceutical manufacturers in identifying the key focus areas for an audit.

  16. Laser Safety Inspection Criteria

    International Nuclear Information System (INIS)

    Barat, K

    2005-01-01

    A responsibility of the Laser Safety Officer (LSO) is to perform laser safety audits. The American National Standard Z136.1 Safe use of Lasers references this requirement in several sections: (1) Section 1.3.2 LSO Specific Responsibilities states under Hazard Evaluation, ''The LSO shall be responsible for hazards evaluation of laser work areas''; (2) Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''; and (3) Appendix D, under Survey and Inspections, it states, ''the LSO will survey by inspection, as considered necessary, all areas where laser equipment is used''. Therefore, for facilities using Class 3B and or Class 4 lasers, audits for laser safety compliance are expected to be conducted. The composition, frequency and rigueur of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms. In many institutions, a sole Laser Safety Officer (LSO) or a number of Deputy LSO's perform these audits. For that matter, there are institutions that request users to perform a self-assessment audit. Many items on the common audit list and the associated findings are subjective because they are based on the experience and interest of the LSO or auditor in particular items on the checklist. Beam block usage is an example; to one set of eyes a particular arrangement might be completely adequate, while to another the installation may be inadequate. In order to provide more consistency, the National Ignition Facility Directorate at Lawrence Livermore National Laboratory (NIF-LLNL) has established criteria for a number of items found on the typical laser safety audit form. These criteria are distributed to laser users, and they serve two broad purposes: first, it gives the user an expectation of what will be reviewed by an auditor, and second, it is an

  17. Incision of the heart during meat inspection of fattening pigs - A risk-profile approach.

    Science.gov (United States)

    Leps, J; Fries, R

    2009-01-01

    Meat inspection in the EU is based on Regulation (EC) 854/2004. Accordingly a risk based meat inspection should be implemented. In this paper, the incision of the heart in pig meat inspection is discussed with respect to efficacy. The incision especially can reveal the presence of endocarditis. Here, Erysipelothrixrhusiopathiae (E. rhusiopathiae) and/or Streptococcussuis (S. suis) are of particular concern. Both agents are regarded to be zoonotic agents. There is some evidence for infection of humans via an alimentary pathway. Hence, the occurrence of E. rhusiopathiae and S. suis is a concern of public health (PH) as well as veterinary public health (VPH). However, other measures, including on-farm disease prevention and diagnosis, seem to be more important for food safety. It is concluded that the incision and inspection of the heart is not justifiable with respect to PH aspects.

  18. Short notice inspections

    International Nuclear Information System (INIS)

    Pouchkarev, V.

    1998-01-01

    For 30 years the IAEA safeguards system have evolved and have been strengthened by the regular introduction of new methods and techniques, improving both its effectiveness and efficiency. The member States of the IAEA have indicated their willingness to accept new obligations and associated technical measure that greatly strengthen the nuclear safeguards system. One element of this is the extent to which the IAEA inspectors have physical access to relevant locations for the purpose of providing independent verification of the exclusively peaceful intent of a State nuclear program. The Protocol to Safeguards granted new legal authority with respect to information on, and short notice inspector access to, all buildings on a nuclear site and administrative agreements that improve the process of designating inspectors and IAEA access to modern means of communication. This report is a short description of unannounced or short notice inspections as measures on which the new strengthened and cost efficient system will be based

  19. Inspection of disposal canisters components

    International Nuclear Information System (INIS)

    Pitkaenen, J.

    2013-12-01

    This report presents the inspection techniques of disposal canister components. Manufacturing methods and a description of the defects related to different manufacturing methods are described briefly. The defect types form a basis for the design of non-destructive testing because the defect types, which occur in the inspected components, affect to choice of inspection methods. The canister components are to nodular cast iron insert, steel lid, lid screw, metal gasket, copper tube with integrated or separate bottom, and copper lid. The inspection of copper material is challenging due to the anisotropic properties of the material and local changes in the grain size of the copper material. The cast iron insert has some acoustical material property variation (attenuation, velocity changes, scattering properties), which make the ultrasonic inspection demanding from calibration point of view. Mainly three different methods are used for inspection. Ultrasonic testing technique is used for inspection of volume, eddy current technique, for copper components only, and visual testing technique are used for inspection of the surface and near surface area

  20. MTR fuel inspection at CERCA

    International Nuclear Information System (INIS)

    Fanjas, Y.

    1992-01-01

    The stringent specifications for MTR fuel plates and fuel elements require various sophisticated inspection techniques. In particular, the development of low enriched silicide fuels made it necessary to adapt these techniques to high density plates. This paper presents the status of inspection technology at CERCA. (author)

  1. 1990 waste tank inspection program

    International Nuclear Information System (INIS)

    McNatt, F.G.

    1990-01-01

    Aqueous radioactive wastes from Savannah River Site separations processes are contained in large underground carbon steel tanks. Tank conditions are evaluated by inspection using periscopes, still photography, and video systems for visual imagery. Inspections made in 1990 are the subject of this report

  2. Computerized automated remote inspection system

    International Nuclear Information System (INIS)

    The automated inspection system utilizes a computer to control the location of the ultrasonic transducer, the actual inspection process, the display of the data, and the storage of the data on IBM magnetic tape. This automated inspection equipment provides two major advantages. First, it provides a cost savings, because of the reduced inspection time, made possible by the automation of the data acquisition, processing, and storage equipment. This reduced inspection time is also made possible by a computerized data evaluation aid which speeds data interpretation. In addition, the computer control of the transducer location drive allows the exact duplication of a previously located position or flaw. The second major advantage is that the use of automated inspection equipment also allows a higher-quality inspection, because of the automated data acquisition, processing, and storage. This storage of data, in accurate digital form on IBM magnetic tape, for example, facilitates retrieval for comparison with previous inspection data. The equipment provides a multiplicity of scan data which will provide statistical information on any questionable volume or flaw. An automatic alarm for location of all reportable flaws reduces the probability of operator error. This system has the ability to present data on a cathode ray tube as numerical information, a three-dimensional picture, or ''hard-copy'' sheet. One important advantage of this system is the ability to store large amounts of data in compact magnetic tape reels

  3. How to quantify sustainable development: a risk-based approach to water quality management.

    Science.gov (United States)

    Sarang, Amin; Vahedi, Arman; Shamsai, Abolfazl

    2008-02-01

    Since the term was coined in the Brundtland report in 1987, the issue of sustainable development has been challenged in terms of quantification. Different policy options may lend themselves more or less to the underlying principles of sustainability, but no analytical tools are available for a more in-depth assessment of the degree of sustainability. Overall, there are two major schools of thought employing the sustainability concept in managerial decisions: those of measuring and those of monitoring. Measurement of relative sustainability is the key issue in bridging the gap between theory and practice of sustainability of water resources systems. The objective of this study is to develop a practical tool for quantifying and assessing the degree of relative sustainability of water quality systems based on risk-based indicators, including reliability, resilience, and vulnerability. Current work on the Karoun River, the largest river in Iran, has included the development of an integrated model consisting of two main parts: a water quality simulation subroutine to evaluate Dissolved Oxygen Biological Oxygen Demand (DO-BOD) response, and an estimation of risk-based indicators subroutine via the First Order Reliability Method (FORM) and Monte Carlo Simulation (MCS). We also developed a simple waste load allocation model via Least Cost and Uniform Treatment approaches in order to consider the optimal point of pollutants control costs given a desired reliability value which addresses DO in two different targets. The Risk-based approach developed herein, particularly via the FORM technique, appears to be an appropriately efficient tool for estimating the relative sustainability. Moreover, our results in the Karoun system indicate that significant changes in sustainability values are possible through dedicating money for treatment and strict pollution controls while simultaneously requiring a technical advance along change in current attitudes for environment protection.

  4. Technology Assessment of the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Woodley, Anthony

    1998-01-01

    ...) Challenge Inspections. The CWC is an intrusive inspection. The Challenge Inspection allows for a team of international inspectors to inspect on very short notice a naval facility suspected of violating the CWC...

  5. Process Improvement to the Inspection Readiness Plan in Chemical Weapons Convention Challenge Inspections

    National Research Council Canada - National Science Library

    Triplett, William

    1997-01-01

    ...) Challenge Inspection. The CWC is an intensive inspection. The Challenge Inspection allows for a team of international inspectors to inspect a naval facility suspected of violating the CWC on very short notice...

  6. Reliability-based inspection planning of 20MW offshore wind turbine jacket

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents the application of a risk and reliability based inspection planning framework (RBI) for the InnWind 20MW reference wind turbine jacket sub-structure. A detailed fracture mechanics based fatigue crack growth model is developed and used as basis to derive optimal inspection plans...

  7. Conclusions with regard to the inspection goals of a system of material balance areas

    International Nuclear Information System (INIS)

    Gladitz, J.

    1989-01-01

    Starting from IAEA inspection goals in the control of individual material balance area, procedures of computation and estimation of inspection goals are derived for a system of material balance areas allowing for an optimal diversion strategy. By it the prerequisites were also developed to an evaluation of these goals for a State as a whole. (author)

  8. International cooperation in production inspections

    International Nuclear Information System (INIS)

    Limousin, S.

    2009-01-01

    Nuclear pressure equipment, like the reactor pressure vessel or steam generators, are manufactured in many countries all around the world. As only few reactors were built in the 90's, most of the nuclear safety authorities have lost part of their know how in component manufacturing oversight. For these two reasons, vendor inspection is a key area for international cooperation. On the one hand, ASN has bilateral relationships with several countries (USA, Finland, China...) to fulfill specific purposes. On the other hand, ASN participates in international groups like the MDEP ( Multinational Design Evaluation Program). A MDEP working group dedicated to vendor inspection cooperation enables exchanges of informations (inspection program plan, inspection findings...) among the regulators. Join inspections are organized. International cooperation could lead in the long term to an harmonization of regulatory practices. (author)

  9. Detailed simulation of ultrasonic inspections

    International Nuclear Information System (INIS)

    Chaplin, K.R.; Douglas, S.R.; Dunford, D.

    1997-01-01

    Simulation of ultrasonic inspection of engineering components have been performed at the Chalk River Laboratories of AECL for over 10 years. The computer model, called EWE for Elastic Wave Equations, solves the Elastic Wave Equations using a novel finite difference scheme. It simulates the propagation of an ultrasonic wave from the transducer to a flaw, the scatter of waves from the flaw, and measurement of signals at a receive transducer. Regions of different materials, water and steel for example, can be simulated. In addition, regions with slightly different material properties from the parent material can be investigated. The two major types of output are displays of the ultrasonic waves inside the component and the corresponding A-scans. EPRI and other organizations have used ultrasonic models for: defining acceptable ultrasonic inspection procedures, designing and evaluating inspection techniques, and for quantifying inspection reliability. The EWE model has been applied to the inspection of large pipes in a nuclear plant, gas pipeline welds and steam generator tubes. Most recent work has dealt with the ultrasonic inspection of pressure tubes in CANDU reactors. Pressure tube inspections can reliably detect and size defects; however, there are improvements that can be made. For example, knowing the sharpness of a flaw-tip is crucial for fitness for service assessments. Computer modelling of the ultrasonic inspection of flaws with different root radius has suggested inspection techniques that provide flaw tip radius information. A preliminary investigation of these methods has been made in the laboratory. The basis for the model will be reviewed at the presentation. Then the results of computer simulations will be displayed on a PC using an interactive program that analyzes simulated A-scans. This software tool gives inspection staff direct access to the results of computer simulations. (author)

  10. Risk-based audit selection of dairy farms.

    Science.gov (United States)

    van Asseldonk, M A P M; Velthuis, A G J

    2014-02-01

    Dairy farms are audited in the Netherlands on numerous process standards. Each farm is audited once every 2 years. Increasing demands for cost-effectiveness in farm audits can be met by introducing risk-based principles. This implies targeting subpopulations with a higher risk of poor process standards. To select farms for an audit that present higher risks, a statistical analysis was conducted to test the relationship between the outcome of farm audits and bulk milk laboratory results before the audit. The analysis comprised 28,358 farm audits and all conducted laboratory tests of bulk milk samples 12 mo before the audit. The overall outcome of each farm audit was classified as approved or rejected. Laboratory results included somatic cell count (SCC), total bacterial count (TBC), antimicrobial drug residues (ADR), level of butyric acid spores (BAB), freezing point depression (FPD), level of free fatty acids (FFA), and cleanliness of the milk (CLN). The bulk milk laboratory results were significantly related to audit outcomes. Rejected audits are likely to occur on dairy farms with higher mean levels of SCC, TBC, ADR, and BAB. Moreover, in a multivariable model, maxima for TBC, SCC, and FPD as well as standard deviations for TBC and FPD are risk factors for negative audit outcomes. The efficiency curve of a risk-based selection approach, on the basis of the derived regression results, dominated the current random selection approach. To capture 25, 50, or 75% of the population with poor process standards (i.e., audit outcome of rejected), respectively, only 8, 20, or 47% of the population had to be sampled based on a risk-based selection approach. Milk quality information can thus be used to preselect high-risk farms to be audited more frequently. Copyright © 2014 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  11. German data for risk based fire safety assessment

    International Nuclear Information System (INIS)

    Roewekamp, M.; Berg, H.P.

    1998-01-01

    Different types of data are necessary to perform risk based fire safety assessments and, in particular, to quantify the fire event tree considering the plant specific conditions. Data on fire barriers, fire detection and extinguishing, including also data on secondary effects of a fire, have to be used for quantifying the potential hazard and damage states. The existing German database on fires in nuclear power plants (NPPs) is very small. Therefore, in general generic data, mainly from US databases, are used for risk based safety assessments. Due to several differences in the plant design and conditions generic data can only be used as conservative assumptions. World-wide existing generic data on personnel failures in case of fire fighting have only to be adapted to the plant specific conditions inside the NPP to be investigated. In contrary, unavailabilities of fire barrier elements may differ strongly depending on different standards, testing requirements, etc. In addition, the operational behaviour of active fire protection equipment may vary depending on type and manufacturer. The necessity for more detailed and for additional plant specific data was the main reason for generating updated German data on the operational behaviour of active fire protection equipment/features in NPPs to support risk based fire safety analyses being recommended to be carried out as an additional tool to deterministic fire hazard analyses in the frame of safety reviews. The results of these investigations revealed a broader and more realistic database for technical reliability of active fire protection means, but improvements as well as collection of further data are still necessary. (author)

  12. Risk-based remediation of polluted sites: A critical perspective.

    Science.gov (United States)

    Kuppusamy, Saranya; Venkateswarlu, Kadiyala; Megharaj, Mallavarapu; Mayilswami, Srinithi; Lee, Yong Bok

    2017-11-01

    Sites contaminated with chemical pollutants represent a growing challenge, and remediation of such lands is of international concern. Risk-based land management (RBLM) is an emerging approach that integrates risk assessment practices with more traditional site-specific investigations and remediation activities. Developing countries are yet to adopt RBLM strategies for remediation. RBLM is considered to be practical, scientifically defensible and cost-efficient. However, it is inherently limited by: firstly, the accuracy of risk assessment models used; secondly, ramifications of the fact that they are more likely to leave contamination in place; and thirdly, uncertainties involved and having to consider the total concentrations of all contaminants in soils that overestimate the potential risks from exposure to the contaminants. Consideration of contaminant bioavailability as the underlying basis for risk assessment and setting remediation goals of those contaminated lands that pose a risk to environmental and human health may lead to the development of a more sophisticated risk-based approach. However, employing the bioavailability concept in RBLM has not been extensively studied and/or legalized. This review highlights the extent of global land contamination, and the concept of risk-based assessment and management of contaminated sites including its advantages and disadvantages. Furthermore, the concept of bioavailability-based RBLM strategy has been proposed, and the challenges of RBLM and the priority areas for future research are summarized. Thus, the present review may help achieve a better understanding and successful implementation of a sustainable bioavailability-based RBLM strategy. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-02-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1990 through December 1990

  14. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January 1993 through March 1993

  15. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1991 through March 1991

  16. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1993-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1992 through December 1992

  17. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1989-12-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from July 1989 through September 1989

  18. Lean Construction Applications for Bridge Inspection

    Science.gov (United States)

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  19. Licensee Contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from October through December 1991

  20. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1993-08-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from April through June 1993

  1. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-09-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1991 through June 1991

  2. Automated visual inspection of moving custom parts

    CSIR Research Space (South Africa)

    Davrajh, S

    2008-01-01

    Full Text Available frequencies than batched produced parts. This higher frequency of inspection significantly impacts inspection times, and inherently, production rates. An effective, diverse, accurate, robust, and time efficient method for inspecting custom parts is therefore...

  3. Licensee contractor and Vendor Inspection status report

    International Nuclear Information System (INIS)

    1992-05-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from January through March 1992

  4. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-07-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from January 1990 through March 1990

  5. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-01-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organizations during the period from October 1989 through December 1989

  6. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1992-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1992 through September 1992

  7. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1991-10-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from July 1991 through September 1991

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-11-01

    This periodical covers the results of inspections performed by the NRC's Vendor Inspection Branch that have been distributed to the inspected organization during the period from April 1990 through June 1990

  9. Characterization of Developer Application Methods Used in Fluorescent Penetrant Inspection

    Science.gov (United States)

    Brasche, L. J. H.; Lopez, R.; Eisenmann, D.

    2006-03-01

    Fluorescent penetrant inspection (FPI) is the most widely used inspection method for aviation components seeing use for production as well as an inservice inspection applications. FPI is a multiple step process requiring attention to the process parameters for each step in order to enable a successful inspection. A multiyear program is underway to evaluate the most important factors affecting the performance of FPI, to determine whether existing industry specifications adequately address control of the process parameters, and to provide the needed engineering data to the public domain. The final step prior to the inspection is the application of developer with typical aviation inspections involving the use of dry powder (form d) usually applied using either a pressure wand or dust storm chamber. Results from several typical dust storm chambers and wand applications have shown less than optimal performance. Measurements of indication brightness and recording of the UVA image, and in some cases, formal probability of detection (POD) studies were used to assess the developer application methods. Key conclusions and initial recommendations are provided.

  10. Fully Employing Software Inspections Data

    Science.gov (United States)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  11. Advanced ultrasonic inspections

    International Nuclear Information System (INIS)

    Ghia, S.

    1990-08-01

    Acoustic Emission (AE) continuous monitoring and periodical inspections by advanced ultrasonic have been applied to evaluate defect evolution within a PWR reduced scale (1:5) pressure vessel subjected to cyclic mechanical fatigue test. This experimental activity has been carried out in the frame of the Primary Circuit Component Life Prediction programme. In the time period covered by this report actions were performed as following: (1) Ultrasonic examination by multifrequency acoustic holography to evaluate defect evolution subsequently repair and heat treatment of the R2 vessel carried out in March 1988. For the purpose, measurements were performed both at 0 and 200 bar of internal pressure. As uniformity of the procedures adopted, for calibration and testing, made the results comparable with the previous ones no evidence for significant growing of the examined defects has been found. (2) Acoustic emission monitoring has then been carried out during fatigue test from 416000 to 565000 fatigue cycles. Analysis of a large amount of data has been performed paying particular attention to the distinction between friction phenomena and crack growth in order to obtain a correct diagnosis of flaw evolution. The signal duration distribution and the correlation of AE appearance time versus load cycle phase were considered to characterise stick-slip processes. A general intensification of AE activity has been recorded during this last period of monitoring and previous known AE sources were confirmed together with the appearance of new AE sources some of them correlable with real defects

  12. Risk-based decisionmaking in the DOE: Challenges and status

    International Nuclear Information System (INIS)

    Henry, C.J.; Alchowiak, J.; Moses, M.

    1995-01-01

    The primary mission of the Environmental Management Program is to protect human health and the environment, the first goal of which must be, to address urgent risks and threats. Another is to provide for a safe workplace. Without credible risk assessments and good risk management practices, the central environmental goals cannot be met. Principles for risk analysis which include principles for risk assessment, management, communication, and priority setting were adopted. As recommended, Environmental Management is using risk-based decision making in its budget process and in the implementation of its program. The challenges presented in using a risk-based Decision making process are to integrate risk assessment methods and cultural and social values so as to produce meaningful priorities. The different laws and regulations governing the Department define risk differently in implementing activities to protect human health and the environment, therefore, assumptions and judgements in risk analysis vary. Currently, the Environmental Management Program is developing and improving a framework to incorporate risk into the budget process and to link the budget, compliance requirements and risk reduction/pollution prevention activities

  13. Risk-based configuration control system: Analysis and approaches

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Lofgren, E.V.; Vesely, W.E.

    1990-01-01

    This paper presents an analysis of risks associated with component outage configurations during power operation of a nuclear power plant and discusses approaches and strategies for developing a risk-based configuration control system. A configuration, as used here, is a set of component states. The objective of risk-based configuration control is to detect and control plant configurations using a risk-perspective. The configuration contributions to core-melt frequency and core-melt probability are studied for two plants. Large core-melt frequency can be caused by configurations and there are a number of such configurations that are not currently controlled by technical specifications. However, the expected frequency of occurrence of the impacting configurations is small and the actual core-melt probability contributions are also generally small. Effective strategies and criteria for controlling configuration risks are presented. Such control strategies take into consideration the risks associated with configurations, the nature and characteristics of the configuration risks, and also the practical considerations such as adequate repair times and/or options to transfer to low risk configurations. Alternative types of criteria are discussed that are not overly restrictive to result in unnecessary plant shutdown, but rather motivates effective test and maintenance practices that control risk-significant configurations to allow continued operation with an adequate margin to meet challenges to safety

  14. Application of risk-based methodologies to prioritize safety resources

    International Nuclear Information System (INIS)

    Rahn, F.J.; Sursock, J.P.; Hosler, J.

    1993-01-01

    The Electric Power Research Institute (EPRI) started a program entitled risk-based prioritization in 1992. The purpose of this program is to provide generic technical support to the nuclear power industry relative to its recent initiatives in the area of operations and maintenance (O ampersand M) cost control using state-of-the-art risk methods. The approach uses probabilistic risk assessment (PRA), or similar techniques, to allocate resources commensurate with the risk posed by nuclear plant operations. Specifically, those items or events that have high risk significance would receive the most attention, while those with little risk content would command fewer resources. As quantified in a companion paper,close-quote the potential O ampersand M cost reduction inherent in this approach is very large. Furthermore, risk-based methods should also lead to safety improvements. This paper outlines the way that the EPRI technical work complements the technical, policy, and regulatory initiatives taken by others in the industry and provides an example of the approach as used to prioritize motor-operated valve (MOV) testing in response to US Nuclear Regulatory Commission (NRC) Generic Letter 89-10

  15. Risk-based configuration control system: Analysis and approaches

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.; Kim, I.S.; Lofgren, E.V.

    1989-01-01

    This paper presents an analysis of risks associated with component outage configurations during power operation of a nuclear power plant and discusses approaches and strategies for developing a risk-based configuration control system. A configuration, as used here, is a set of component states. The objective of risk-based configuration control is to detect and control plant configurations using a risk-perspective. The configuration contributions to core-melt frequency and core-melt probability are studied for two plants. Large core-melt frequency can be caused by configurations and there are a number of such configurations that are not currently controlled by technical specifications. However, the expected frequency of occurrence of the impacting configurations is small and the actual core-melt probability contributions are also generally small. Effective strategies and criteria for controlling configuration risks are presented. Such control strategies take into consideration the risks associated with configurations, the nature and characteristics of the configuration risks, and also the practical considerations such as adequate repair times and/or options to transfer to low risk configurations. Alternative types of criteria are discussed that are not overly restrictive to result in unnecessary plant shutdown, but rather motivates effective tests and maintenance practices that control; risk-significant configurations to allow continued operation with an adequate margin to meet challenges to safety. 3 refs., 7 figs., 2 tabs

  16. Study of operational risk-based configuration control

    Energy Technology Data Exchange (ETDEWEB)

    Vesely, W E [Science Applications International Corp., Dublin, OH (United States); Samanta, P K; Kim, I S [Brookhaven National Lab., Upton, NY (United States)

    1991-08-01

    This report studies aspects of a risk-based configuration control system to detect and control plant configurations from a risk perspective. Configuration control, as the term is used here, is the management of component configurations to achieve specific objectives. One important objective is to control risk and safety. Another is to operate efficiently and make effective use of available resources. PSA-based evaluations are performed to study configuration to core-melt frequency and core-melt probability for two plants. Some equipment configurations can cause large core-melt frequency and there are a number of such configurations that are not currently controlled by technical specifications. However, the expected frequency of occurrence of the impacting configurations is small and the core-melt probability contributions are also generally small. The insights from this evaluation are used to develop the framework for an effective risk-based configuration control system. The focal points of such a system and the requirements for tools development for implementing the system are defined. The requirements of risk models needed for the system, and the uses of plant-specific data are also discussed. 18 refs., 25 figs., 10 tabs.

  17. Risk-based decisionmaking in the DOE: Challenges and status

    Energy Technology Data Exchange (ETDEWEB)

    Henry, C.J.; Alchowiak, J.; Moses, M. [Dept. of Energy, Washington, DC (United States)] [and others

    1995-12-31

    The primary mission of the Environmental Management Program is to protect human health and the environment, the first goal of which must be, to address urgent risks and threats. Another is to provide for a safe workplace. Without credible risk assessments and good risk management practices, the central environmental goals cannot be met. Principles for risk analysis which include principles for risk assessment, management, communication, and priority setting were adopted. As recommended, Environmental Management is using risk-based decision making in its budget process and in the implementation of its program. The challenges presented in using a risk-based Decision making process are to integrate risk assessment methods and cultural and social values so as to produce meaningful priorities. The different laws and regulations governing the Department define risk differently in implementing activities to protect human health and the environment, therefore, assumptions and judgements in risk analysis vary. Currently, the Environmental Management Program is developing and improving a framework to incorporate risk into the budget process and to link the budget, compliance requirements and risk reduction/pollution prevention activities.

  18. Toward a Safety Risk-Based Classification of Unmanned Aircraft

    Science.gov (United States)

    Torres-Pomales, Wilfredo

    2016-01-01

    There is a trend of growing interest and demand for greater access of unmanned aircraft (UA) to the National Airspace System (NAS) as the ongoing development of UA technology has created the potential for significant economic benefits. However, the lack of a comprehensive and efficient UA regulatory framework has constrained the number and kinds of UA operations that can be performed. This report presents initial results of a study aimed at defining a safety-risk-based UA classification as a plausible basis for a regulatory framework for UA operating in the NAS. Much of the study up to this point has been at a conceptual high level. The report includes a survey of contextual topics, analysis of safety risk considerations, and initial recommendations for a risk-based approach to safe UA operations in the NAS. The next phase of the study will develop and leverage deeper clarity and insight into practical engineering and regulatory considerations for ensuring that UA operations have an acceptable level of safety.

  19. A risk-based approach to prioritize underground storage tanks

    International Nuclear Information System (INIS)

    Chidambariah, V.; Travis, C.C.; Trabalka, J.R.; Thomas, J.K.

    1992-01-01

    The purpose of this paper is to present a risk-based approach for rapid prioritization of low level liquid radioactive waste underground storage tanks (LLLW USTs) for possible interim corrective measures and/or ultimate closure. The ranking of LLLW USTs is needed to ensure that tanks with the greatest potential for adverse impact on the environment and human health receive top priority for further evaluation and remediation. Wastes from the LLLW USTs at the Oak Ridge National Laboratory (ORNL) were pumped out at the time the tanks were removed from service. The residual liquids and sludge contain a mixture of radionuclides and chemicals. Contaminants of concern that were identified in the liquid phase of the inactive LLLW USTs include, the radionuclides, 9O Sr, 137 Cs and 233 U and the chemicals, carbon tetrachloride, trichloroethene, tetrachloroethene, methyl ethyl ketone, mercury, lead and chromium. The risk-based approach for prioritization of the LLLW USTs is based upon three major criteria: (1) leaking characteristics of the tank; (2) location of the tanks; and (3) toxic potential of the tank contents

  20. Current food chain information provides insufficient information for modern meat inspection of pigs.

    Science.gov (United States)

    Felin, Elina; Jukola, Elias; Raulo, Saara; Heinonen, Jaakko; Fredriksson-Ahomaa, Maria

    2016-05-01

    Meat inspection now incorporates a more risk-based approach for protecting human health against meat-borne biological hazards. Official post-mortem meat inspection of pigs has shifted to visual meat inspection. The official veterinarian decides on additional post-mortem inspection procedures, such as incisions and palpations. The decision is based on declarations in the food chain information (FCI), ante-mortem inspection and post-mortem inspection. However, a smooth slaughter and inspection process is essential. Therefore, one should be able to assess prior to slaughter which pigs are suitable for visual meat inspection only, and which need more profound inspection procedures. This study evaluates the usability of the FCI provided by pig producers and considered the possibility for risk ranking of incoming slaughter batches according to the previous meat inspection data and the current FCI. Eighty-five slaughter batches comprising 8954 fattening pigs were randomly selected at a slaughterhouse that receives animals from across Finland. The mortality rate, the FCI and the meat inspection results for each batch were obtained. The current FCI alone provided insufficient and inaccurate information for risk ranking purposes for meat inspection. The partial condemnation rate for a batch was best predicted by the partial condemnation rate calculated for all the pigs sent for slaughter from the same holding in the previous year (p<0.001) and by prior information on cough declared in the current FCI (p=0.02) statement. Training and information to producers are needed to make the FCI reporting procedures more accurate. Historical meat inspection data on pigs slaughtered from the same holdings and well-chosen symptoms/signs for reporting, should be included in the FCI to facilitate the allocation of pigs for visual inspection. The introduced simple scoring system can be easily used for additional information for directing batches to appropriate meat inspection procedures. To

  1. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  2. Non-destructive inservice inspections

    International Nuclear Information System (INIS)

    Kauppinen, P.; Sarkimo, M.; Lahdenperae, K.

    1998-01-01

    In order to assess the possible damages occurring in the components and structures of operating nuclear power plants during service the main components and structures are periodically inspected by non-destructive testing techniques. The reliability of non-destructive testing techniques applied in these inservice inspections is of major importance because the decisions concerning the needs for repair of components are mainly based on the results of inspections. One of the targets of this research program has been to improve the reliability of non-destructive testing. This has been addressed in the sub-projects which are briefly summarised here. (author)

  3. Targeted In-service Inspections Using Risk Insights

    International Nuclear Information System (INIS)

    Kulat, S.; Montgomery, B.; Robin Graybeal, M.

    2012-01-01

    This paper includes a discussion of the historical background and rationale for development of a targeted In-service Inspection (ISI) program using risk insights, known as Risk-Informed In-service Inspection (RI-ISI). RI-ISI programs are optimized inspection programs which target specific welds for inspection based upon potential degradation mechanisms and consequences of failure. Inspections are performed on those welds that are the highest contributors to plant risk. Additionally the inspections are tailored to detect the specific postulated degradation mechanisms. As a result, the numbers of inspections are reduced along with the associated cost and radiation exposure, while maintaining or improving the level of quality and safety. Provided in this paper are the basic principles of RI-ISI program development, and a summary of the impact of the implementation of such programs. For example, implementation of a Risk-Informed In-service Inspection program results in a reduction of both cost and radiation exposure. Cost savings are estimated at between USD 1,000,000 and USD 2,300,000 per unit per ten year interval for a Class 1 and2 RI-ISI application. Cost savings are estimated based on average cost per weld of USD 7600 for examination, including the following activities: erection and removal of scaffolding, removal and replacement of insulation, removal and replacement of interferences, weld preparation, examination, documentation, craft support. Reduction in radiation exposure is estimated at 75% to 90% for a Class 1 and2 RI-ISI application. Reduction in radiation exposure is due to the following factors: number of welds selected for examination decreases by 60% to 75%, surface examinations essentially eliminated, within a given risk category, welds can be selected for examination based on additional factors such as the minimization of radiation exposure.(author).

  4. A Risk-Based Approach for Asset Allocation with A Defaultable Share

    Directory of Open Access Journals (Sweden)

    Yang Shen

    2018-02-01

    Full Text Available This paper presents a novel risk-based approach for an optimal asset allocation problem with default risk, where a money market account, an ordinary share and a defaultable security are investment opportunities in a general non-Markovian economy incorporating random market parameters. The objective of an investor is to select an optimal mix of these securities such that a risk metric of an investment portfolio is minimized. By adopting a sub-additive convex risk measure, which takes into account interest rate risk, as a measure for risk, the investment problem is discussed mathematically in a form of a two-player, zero-sum, stochastic differential game between the investor and the market. A backward stochastic differential equation approach is used to provide a flexible and theoretically sound way to solve the game problem. Closed-form expressions for the optimal strategies of the investor and the market are obtained when the penalty function is a quadratic function and when the risk measure is a sub-additive coherent risk measure. An important case of the general non-Markovian model, namely the self-exciting threshold diffusion model with time delay, is considered. Numerical examples based on simulations for the self-exciting threshold diffusion model with and without time delay are provided to illustrate how the proposed model can be applied in this important case. The proposed model can be implemented using Excel spreadsheets.

  5. Continuous improvement in manufacturing and inspection of fuel

    International Nuclear Information System (INIS)

    Domingon, A.; Ruiz, R.

    2015-01-01

    The manufacturing and inspection process of fuel assemblies in ENUSA is characterized by its robustness acquired over the last thirty years of experience in manufacturing. The reliability of these processes is based on a qualified processes and continuous improvement in the design and upgrading of equipment and optimization of software and manufacturing processes. Additionally, management and quality control systems have been improved in both software and measuring business objectives. this article emphasizes the improvements made over the past five years in management, production and inspection of fuel assemblies. (Author)

  6. Availability and cost functions for periodically inspected preventively maintained units

    International Nuclear Information System (INIS)

    Vaurio, J.K.

    1999-01-01

    Unavailability and cost rate functions are developed for components whose failures can occur randomly but they are detected only by periodic testing or inspections. If a failure occurs between consecutive inspections, the unit remains failed until the next inspection. Components are renewed by preventive maintenance periodically, or by repair or replacement after a failure, whichever occurs first (age-replacement). The model takes into account finite repair and maintenance durations as well as costs due to testing, repair, maintenance and lost production or accidents. For normally operating units the time-related penalty is loss of production. For standby safety equipment it is the expected cost of an accident that can happen when the component is down due to a dormant failure, repair or maintenance. The objective of maintenance optimization is to minimize the total cost rate by proper selection of two intervals, one for inspections and one for replacements. General conditions and techniques are developed for solving optimal test and maintenance intervals, with and without constraints on the production loss or accident rate. Insights are gained into how the optimal intervals depend on various cost parameters and reliability characteristics

  7. Multifamily Housing Physical Inspection Scores

    Data.gov (United States)

    Department of Housing and Urban Development — HUD's Real Estate Assessment Center conducts physical property inspections of properties that are owned, insured or subsidized by HUD, including public housing and...

  8. Incore inspection and repairing device

    International Nuclear Information System (INIS)

    Ito, Arata; Kimura, Motohiko

    1998-01-01

    The present invention provides a device for inspecting and repairing the inside of a reactor container even if it is narrow, with no trouble by using a swimming-type operation robot. Namely, the device of the present invention conducts inspection and repairing operations for the inside of the reactor by introducing a swimming type operation robot into the reactor container. The swimming-type operation robot comprises a robot main body having a propeller, a balancer operably disposed to the robot main body and an inspection and repairing unit attached detachable to the balancer. In the device of the present invention, since the inspection and preparing unit is attached detachably to the swimming robot, a robot which transports tools is formed as a standard product. As a result, the production cost can be reduced, and the reliability of products can be improved. Appropriate operations can be conducted by using best tools. (I.S.)

  9. In-service inspection techniques

    International Nuclear Information System (INIS)

    Backfisch, W.; Zipser, R.R.

    1980-01-01

    The owner of a nuclear power plant (NPP) is obligated and interested to maintain - by regular maintenance and in-service inspections - the operational safety and availability of the plant for the subsequent operating period in a condition, as is specified as the basis of the erection and the last operational permits. In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor or on a boiling-water reactor) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  10. Knowledge-Based Inspection Capabilities

    National Research Council Canada - National Science Library

    Marrano, Lance R; Grussing, Michael N

    2006-01-01

    ... does not present a compelling safety hazard. Abandoning certain inspection programs to reduce costs is not a viable alternative, however, because that could degrade real property investments, soldier quality of life, and mission-readiness...

  11. Construction inspection manual of procedures

    Science.gov (United States)

    2009-01-01

    This manual provides highway construction personnel with relevant, practical information in order to perform accurate inspections and provide relevant construction procedural information for the various roadway and structures items of work. It is the...

  12. National Automated Conformity Inspection Process -

    Data.gov (United States)

    Department of Transportation — The National Automated Conformity Inspection Process (NACIP) Application is intended to expedite the workflow process as it pertains to the FAA Form 81 0-10 Request...

  13. Public Housing Physical Inspection Scores

    Data.gov (United States)

    Department of Housing and Urban Development — HUD's Real Estate Assessment Center conducts physical property inspections of properties that are owned, insured or subsidized by HUD, including public housing and...

  14. Ultrasonic inspection of austenitic welds

    Energy Technology Data Exchange (ETDEWEB)

    Tomlinson, J R; Wagg, A R; Whittle, M J [N.D.T. Applications Centre, CEGB, Manchester (United Kingdom)

    1980-11-01

    The metallurgical structure of austenitic welds is described and contrasted with that found in ferritic welds. It is shown that this structure imparts a marked elastic anisotropy in the ultrasonic propagation parameters. Measurements of variations in the apparent attenuation of sound and deviations in the beam direction are described. The measurements are interpreted in terms of the measured velocity anisotropy. Two applications of the fundamental work are described. In the first it is shown how, by using short pulse compression wave probes, and with major modification of the welding procedure, a stainless steel fillet weld in an AGR boiler can be inspected. In the second application, alternative designs of a transition butt weld have been compared for ease of ultrasonic inspection. The effects of two different welding processes on such an inspection are described. Finally, the paper examines the prospects for future development of inspection and defect-sizing techniques for austenitic welds. (author)

  15. Sea bed mapping and inspection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The conference has 24 presentations on the topics: Sea bed mapping, inspection, positioning, hydrography, marine archaeology, remote operation vehicles and computerized simulation technologies, oil field activities and plans, technological experiences and problems. (tk)

  16. Gravity Probe B Inspection

    Science.gov (United States)

    2000-01-01

    The space vehicle Gravity Probe B (GP-B) is the relativity experiment developed at Stanford University to test two extraordinary predictions of Albert Einstein's general theory of relativity. The experiment will measure, very precisely, the expected tiny changes in the direction of the spin axes of four gyroscopes contained in an Earth-orbiting satellite at a 400-mile altitude. So free are the gyroscopes from disturbance that they will provide an almost perfect space-time reference system. They will measure how space and time are very slightly warped by the presence of the Earth, and, more profoundly, how the Earth's rotation very slightly drags space-time around with it. These effects, though small for the Earth, have far-reaching implications for the nature of matter and the structure of the Universe. GP-B is among the most thoroughly researched programs ever undertaken by NASA. This is the story of a scientific quest in which physicists and engineers have collaborated closely over many years. Inspired by their quest, they have invented a whole range of technologies that are already enlivening other branches of science and engineering. In this photograph, engineer Gary Reynolds is inspecting the inside of the probe neck during probe thermal repairs. GP-B is scheduled for launch in April 2004 and managed for NASA by the Marshall Space Flight Center. Development of the GP-B is the responsibility of Stanford University along with major subcontractor Lockheed Martin Corporation. (Image credit to Russ Leese, Gravity Probe B, Stanford University)

  17. Risk-based planning and optimization of flood management measures in developing countries : Case Pakistan

    NARCIS (Netherlands)

    Tariq, M.A.U.R.

    2011-01-01

    About 95-97% of all deaths and a significant part of the economic losses caused by floods occur in developing countries. Despite the resources spent on different measures, flood management arrangements in developing countries are still unable to deliver satisfactory results. The objective of this

  18. Risk-based optimization of photon and proton radiotherapy for pediatric medulloblastoma

    DEFF Research Database (Denmark)

    Brodin, Nils Patrik

    Medulloblastoma (MB) is one of the most common brain tumors in children and most patients will survive their disease if treated with surgery, radio- and chemotherapy. This has resulted in a growing number of MB survivors who are at risk of developing severe late complications related to the aggre...

  19. The safety monitor and RCM workstation as complementary tools in risk based maintenance optimization

    International Nuclear Information System (INIS)

    Rawson, P.D.

    2000-01-01

    Reliability Centred Maintenance (RCM) represents a proven technique for rendering maintenance activities safer, more effective, and less expensive, in terms of systems unavailability and resource management. However, it is believed that RCM can be enhanced by the additional consideration of operational plant risk. This paper discusses how two computer-based tools, i.e., the RCM Workstation and the Safety Monitor, can complement each other in helping to create a living preventive maintenance strategy. (author)

  20. Risk based optimization of technical specifications for operation of nuclear power plants

    International Nuclear Information System (INIS)

    1993-12-01

    The objective of the report is to present an overview of the risk and reliability based approaches (using a probabilistic safety assessment (PSA)) for improving nuclear power plant technical specifications (TS). In that case, it will provide an information base to the Member States in seeking PSA based applications to enhance the effectiveness of their technical specifications. To achieve this objective, the report discusses the basic objectives and reasons for seeking TS changes, the methods, data requirements and uses of different types of applications, and an overview of different applications that have been completed, including detailed descriptions of selected applications. Refs, figs and tabs

  1. Nuclear reactor vessel inspection apparatus

    International Nuclear Information System (INIS)

    Blackstone, E.G.; Lofy, R.A.; Williams, L.P.

    1979-01-01

    Apparatus for the in situ inspection of a nuclear reactor vessel to detect the location and character of flaws in the walls of the vessel, in the welds joining the various sections of the vessel, in the welds joining attachments such as nozzles, elbows and the like to the reactor vessel and in such attachments wherein an inspection head carrying one or more ultrasonic transducers follows predetermined paths in scanning the various reactor sections, welds and attachments

  2. Austenitic stainless steel weld inspection

    International Nuclear Information System (INIS)

    Mech, S.J.; Emmons, J.S.; Michaels, T.E.

    1978-01-01

    Analytical techniques applied to ultrasonic waveforms obtained from inspection of austenitic stainless steel welds are described. Experimental results obtained from a variety of geometric and defect reflectors are presented. Specifically, frequency analyses parameters, such as simple moments of the power spectrum, cross-correlation techniques, and adaptive learning network analysis, all represent improvements over conventional time domain analysis of ultrasonic waveforms. Results for each of these methods are presented, and the overall inspection difficulties of austenitic stainless steel welds are discussed

  3. Automated visual inspection of textile

    DEFF Research Database (Denmark)

    Jensen, Rune Fisker; Carstensen, Jens Michael

    1997-01-01

    A method for automated inspection of two types of textile is presented. The goal of the inspection is to determine defects in the textile. A prototype is constructed for simulating the textile production line. At the prototype the images of the textile are acquired by a high speed line scan camera...... the protype to a production line system we only need to gain a speed factor of 4....

  4. On the development of the system of risk-based supervision in the field of sanitary and epidemiological welfare of the population and consumer protection

    Directory of Open Access Journals (Sweden)

    A.Y. Popova

    2015-12-01

    Full Text Available In order to fulfill the legal requirements for the transition to the new risk-based model of the state control (supervision in the Federal Service for Consumer Rights Protection and Human Welfare, the methodical approaches to the classification of economic entities and activities of potential risk of injury have been developed. The risk assessment takes into account the frequency of violations of sanitary legislation, the severity of the consequences of these violations for the health and extent of negative effects, which is estimated in terms of population under the influence of the economic entity. Algorithms and methods for calculating the exposed population: workers, consumers, including consumer food products, non-food products and services; residents of settlements under the negative impact of air pollution, water and soil, have been developed. Regional and federal registries of objects for sanitary and epidemiological supervision are formed. Testing of the risk-based approaches in the regions allowed excluding the low risk harm objects when forming the audit plans for 2016, due to what the number of planned inspections all over country was reduces by more than 20 %. The basic directions of further improvement of the risk-based model of sanitary and epidemiological surveillance: its extension to the system of technical regulation and consumer protection; scientific substantiation of its volume, content and laboratory support of the scheduled inspections of objects belonging to different classes of health risk; improving procedures and methods for evaluating the effectiveness and efficiency of risk-based supervisory activities; creation of an effective system of risk communication between the sanitary and epidemiological surveillance, economic entities, public organizations and associations and civil society.

  5. Ultrasonic inspection of inpile tubes

    International Nuclear Information System (INIS)

    Boyd, D.M.; Bossi, H.

    1985-01-01

    The in-service inspection (ISI) of inpile tubes can be performed accurately and safely with a semiautomatic ultrasonic inspection system. The ultrasonic technique uses a set of multiple transducers to detect and size cracks, voids, and laminations radially and circumferentially. Welds are also inspected for defects. The system is designed to inspect stainless steel and Inconel tubes ranging from 53.8 mm (2.12 in.) to 101.6 mm (4 in.) inner diameter with wall thickness on the order of 5 mm. The inspection head contains seven transducers mounted in a surface-following device. Six angle-beam transducers generate shear waves in the tubes. Two of the six are oriented to detect circumferential cracks, and two detect axial cracks. Although each of these four transducers is used in the pulse-echo mode, they are oriented in aligned sets so pitch-catch operation is possible if desired. The remaining angle-beam transducers are angulated to detect flaws that are off axial or circumferential orientation. The seventh transducer is used for longitudinal inspection and detects and sizes laminar-type defects

  6. Stochastic Watershed Models for Risk Based Decision Making

    Science.gov (United States)

    Vogel, R. M.

    2017-12-01

    Over half a century ago, the Harvard Water Program introduced the field of operational or synthetic hydrology providing stochastic streamflow models (SSMs), which could generate ensembles of synthetic streamflow traces useful for hydrologic risk management. The application of SSMs, based on streamflow observations alone, revolutionized water resources planning activities, yet has fallen out of favor due, in part, to their inability to account for the now nearly ubiquitous anthropogenic influences on streamflow. This commentary advances the modern equivalent of SSMs, termed `stochastic watershed models' (SWMs) useful as input to nearly all modern risk based water resource decision making approaches. SWMs are deterministic watershed models implemented using stochastic meteorological series, model parameters and model errors, to generate ensembles of streamflow traces that represent the variability in possible future streamflows. SWMs combine deterministic watershed models, which are ideally suited to accounting for anthropogenic influences, with recent developments in uncertainty analysis and principles of stochastic simulation

  7. Nuclear insurance risk assessment using risk-based methodology

    International Nuclear Information System (INIS)

    Wendland, W.G.

    1992-01-01

    This paper presents American Nuclear Insurers' (ANI's) and Mutual Atomic Energy Liability Underwriters' (MAELU's) process and experience for conducting nuclear insurance risk assessments using a risk-based methodology. The process is primarily qualitative and uses traditional insurance risk assessment methods and an approach developed under the auspices of the American Society of Mechanical Engineers (ASME) in which ANI/MAELU is an active sponsor. This process assists ANI's technical resources in identifying where to look for insurance risk in an industry in which insurance exposure tends to be dynamic and nonactuarial. The process is an evolving one that also seeks to minimize the impact on insureds while maintaining a mutually agreeable risk tolerance

  8. Risk-based prioritization at Hanford Nuclear Site

    International Nuclear Information System (INIS)

    Hesser, W.A.; Mosely, M.T.

    1995-11-01

    This paper describes the method used to incorporate risk-based decision making into the Hanford resource allocation process. This method, the Revised Priority Planning Grid, is used as a tool to calculate benefits and benefit-to-cost ratios for comparison of environmental cleanup activities. The tool is based on Hanford Site objectives. Benefits are determined by estimating the impact on those objectives resulting from funding specific environmental management activities. Impacts are also a function of the weights associated with the objectives. These weights in the Revised Priority Planning Grid reflect US Development of Energy management values, which were obtained through a formal value-elicitation process. With modification to the objectives and weights, the Revised Priority Planning Grid could be used in different situations. By factoring in environmental, safety, and health risk and assigning higher scores to those activities that provide the most benefit, the Revised Priority Planning Grid is a reproducible, scientific way of scoring competing activities or interests

  9. Methodology for risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Vesely, W.E.; Gaertner, J.P.; Wagner, D.P.

    1985-01-01

    Part of the effort by EPRI to apply probabilistic risk assessment methods and results to the solution of utility problems involves the investigation of methods for risk-based analysis of technical specifications. The culmination of this investigation is the SOCRATES computer code developed by Battelle's Columbus Laboratories to assist in the evaluation of technical specifications of nuclear power plants. The program is designed to use information found in PRAs to re-evaluate risk for changes in component allowed outage times (AOTs) and surveillance test intervals (STIs). The SOCRATES program is a unique and important tool for technical specification evaluations. The detailed component unavailability model allows a detailed analysis of AOT and STI contributions to risk. Explicit equations allow fast and inexpensive calculations. Because the code is designed to accept ranges of parameters and to save results of calculations that do not change during the analysis, sensitivity studies are efficiently performed and results are clearly displayed

  10. Case studies: Risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Wagner, D.P.; Minton, L.A.; Gaertner, J.P.

    1987-01-01

    The SOCRATES computer program uses the results of a Probabilistic Risk Assessment (PRA) or a system level risk analysis to calculate changes in risk due to changes in the surveillance test interval and/or the allowed outage time stated in the technical specification. The computer program can accommodate various testing strategies (such as staggered or simultaneous testing) to allow modeling of component testing as it is carried out at a plant. The methods and computer program are an integral part of a larger decision process aimed at determining benefits from technical specification changes. These benefits can include cost savings to the utilities by reducing forced shutdowns with no adverse impacts on risk. Three summaries of case study applications are included to demonstrate the types of results that can be achieved through risk-based evaluation of technical specifications. (orig.)

  11. Earthquake insurance pricing: a risk-based approach.

    Science.gov (United States)

    Lin, Jeng-Hsiang

    2018-04-01

    Flat earthquake premiums are 'uniformly' set for a variety of buildings in many countries, neglecting the fact that the risk of damage to buildings by earthquakes is based on a wide range of factors. How these factors influence the insurance premiums is worth being studied further. Proposed herein is a risk-based approach to estimate the earthquake insurance rates of buildings. Examples of application of the approach to buildings located in Taipei city of Taiwan were examined. Then, the earthquake insurance rates for the buildings investigated were calculated and tabulated. To fulfil insurance rating, the buildings were classified into 15 model building types according to their construction materials and building height. Seismic design levels were also considered in insurance rating in response to the effect of seismic zone and construction years of buildings. This paper may be of interest to insurers, actuaries, and private and public sectors of insurance. © 2018 The Author(s). Disasters © Overseas Development Institute, 2018.

  12. 12 CFR 652.100 - Audit of the risk-based capital stress test.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Audit of the risk-based capital stress test... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Risk-Based Capital Requirements § 652.100 Audit of the risk-based capital stress test. You must have a qualified, independent external auditor review...

  13. 76 FR 13902 - Fair Credit Reporting Risk-Based Pricing Regulations

    Science.gov (United States)

    2011-03-15

    ... TRADE COMMISSION 16 CFR Parts 640 and 698 RIN R411009 Fair Credit Reporting Risk-Based Pricing... respective risk-based pricing rules to require disclosure of credit scores and information relating to credit scores in risk-based pricing notices if a credit score of the consumer is used in setting the material...

  14. 76 FR 35138 - Federal Agricultural Mortgage Corporation Funding and Fiscal Affairs; Farmer Mac Risk-Based...

    Science.gov (United States)

    2011-06-16

    ... Funding and Fiscal Affairs; Farmer Mac Risk-Based Capital Stress Test, Version 5.0 AGENCY: Farm Credit... credit rating agency) in regulations addressing the Risk-Based Capital Stress Test (RBCST or stress test...) (repealing and replacing Pub. L. 110-234). B. Risk-Based Capital and Credit Ratings Under our rules, Farmer...

  15. Demonstration of risk-based approaches to nuclear plant regulation

    International Nuclear Information System (INIS)

    Rahn, F.J.; Sursock, J.P.; Darling, S.S.; Oddo, J.M.

    1993-01-01

    This paper describes generic technical support EPRI is providing to the nuclear power industry relative to its recent initiatives in the area of risk-based regulations (RBR). A risk-based regulatory approach uses probabilistic risk assessment (PRA), or similar techniques, to allocate safety resources commensurate with the risk posed by nuclear plant operations. This approach will reduce O ampersand M costs, and also improve nuclear plant safety. In order to enhance industry, Nuclear Regulatory Commission (NRC) and public confidence in RBR, three things need to be shown: (1) manpower/resource savings are significant for both NRC and industry; (2) the process is doable in a reasonable amount of time; and (3) the process, if uniformly applied, results in demonstrably cheaper power and safer plants. In 1992, EPRI performed a qualitative study of the key RBR issues contributing to high O ampersand M costs. The results are given on Table 1. This study is being followed up by an in-depth quantitative cost/benefit study to focus technical work on producing guidelines/procedures for licensing submittals to NRC. The guidelines/procedures necessarily will be developed from successful demonstration projects such as the Fitzpatrick pilot plant study proposed by the New York Power Authority and other generic applications. This paper presents three examples: two motor operated valve projects performed by QUADREX Energy Services Corporation working with utilities in responding to NRC Generic Letter 89-10, and a third project working with Yankee Atomic Electric Company on service water systems at a plant in its service system. These demonstration projects aim to show the following: (1) the relative ease of putting together a technical case based on RBR concepts; (2) clarity in differentiating the various risk trade-offs, and in communicating overall reductions in risk with NRC; and (3) improved prioritization of NRC directives

  16. Task of radiation hygiene inspection at NPPs

    International Nuclear Information System (INIS)

    Shevts, J.; Kunz, Eh.

    1983-01-01

    The task and functions of the radiation-hygiene inspection in Czechoslovakia are presented. The radiation safety related information amounts that are to be presented to the hygiene inspection institutions are determined. The hygiene inspection content and forms at the stages of NPP designing, construction and operation are discussed. The hygiene inspection place is determined within the general radiation safety system [ru

  17. Automated ultrasonic inspection of nuclear plant components

    International Nuclear Information System (INIS)

    Baron, J.A.; Dolbey, M.P.

    1982-01-01

    For reasons of safety and efficiency, automated systems are used in performing ultrasonic inspection of nuclear components. An automated system designed specifically for the inspection of headers in a nuclear plant is described. In-service inspection results obtained with this system are shown to correlate with pre-service inspection results obtained by manual methods

  18. ROBOTIC TANK INSPECTION END EFFECTOR

    International Nuclear Information System (INIS)

    Rachel Landry

    1999-01-01

    The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related sub-tasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these sub-tasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these sub-tasks were derived from the original intent

  19. Siemens capabilities to perform detailed fuel inspections during short outages

    International Nuclear Information System (INIS)

    Knecht, K.; Reparaz, A.

    1999-01-01

    Fuel inspection data are used to support development activities such as corrosion resistant cladding and advanced fuel assembly designs that will reach higher burnups. Increased inspection efforts are necessary to optimize fuel management and performance strategies. Additionally, there is an increasing trend to reduce outage time in Germany and abroad. Siemens has recently developed several timesaving systems for rapid inspection of fuel assemblies and core components. Siemens' focus in developing these systems has been to obtain data in reduced reactor outage time while increasing both the volume and the quality of the measured data. Mast sipping for PWRs is used for identifying leaking fuel assemblies and allows early detection of leaks during downloading of the fuel assemblies from the reactor. An In-Core sipping system for BWRs based on a hood technique to allow testing a full core within 16 hours is under development. (authors)

  20. NELIS - a Neutron Inspection System for Detection of Illicit Drugs

    International Nuclear Information System (INIS)

    Barzilov, Alexander P.; Womble, Phillip C.; Vourvopoulos, George

    2003-01-01

    NELIS (Neutron ELemental Inspection System) is currently being developed to inspect cargo pallets for illicit drugs. NELIS must be used in conjunction with an x-ray imaging system to optimize the inspection capabilities at ports of entry. Pulsed fast-thermal neutron analysis is utilized to measure the major and minor chemical elements in a non-destructive and non-intrusive manner. Fourteen-MeV neutrons produced with a pulsed d-T neutron generator are the interrogating particles. NELIS analyzes the characteristic gamma rays emitted from the object that are produced by nuclear reactions from fast and thermal neutrons. These gamma rays have different energies for each chemical element, and act as their fingerprints. Since the elemental composition of illicit drugs is quite different from that of innocuous materials, drugs hidden in pallets are identified through the comparison of expected and measured elemental composition and ratios. Results of tests of the system will be discussed

  1. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  2. Do school inspections improve primary school performance?

    OpenAIRE

    Dinand Webbink; Rob Luginbuhl; I. de Wolf

    2007-01-01

    Inspectors from the Dutch Inspectorate of Education inspect primary schools, write inspection reports on each inspected school, and make recommendations as to how each school can improve. We test whether these inspections result in better school performance. Using a fixed-effects model, we find evidence that school inspections do lead to measurably better school performance. Our assessment of school performance is based on the Cito test scores of pupils in their final year of primary school. ...

  3. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  4. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  5. Assessing risk factors in the organic control system: evidence from inspection data in Italy.

    Science.gov (United States)

    Zanoli, Raffaele; Gambelli, Danilo; Solfanelli, Francesco

    2014-12-01

    Certification is an essential feature in organic farming, and it is based on inspections to verify compliance with respect to European Council Regulation-EC Reg. No 834/2007. A risk-based approach to noncompliance that alerts the control bodies to activate planning inspections would contribute to a more efficient and cost-effective certification system. An analysis of factors that can affect the probability of noncompliance in organic farming has thus been developed. This article examines the application of zero-inflated count data models to farm-level panel data from inspection results and sanctions obtained from the Ethical and Environmental Certification Institute, one of the main control bodies in Italy. We tested many a priori hypotheses related to the risk of noncompliance. We find evidence of an important role for past noncompliant behavior in predicting future noncompliance, while farm size and the occurrence of livestock also have roles in an increased probability of noncompliance. We conclude the article proposing that an efficient risk-based inspection system should be designed, weighting up the known probability of occurrence of a given noncompliance according to the severity of its impact. © 2014 Society for Risk Analysis.

  6. Examination of the association between announced inspections and inspection scores.

    Science.gov (United States)

    Waters, A Blake; VanDerslice, James; Porucznik, Christina A; Kim, Jaewhan; DeLegge, Royal; Durrant, Lynne

    2013-09-01

    In 2010 the Salt Lake Valley Health Department conducted a pilot of an announced inspection program utilizing a randomized assignment of restaurants to an intervention group with announced inspections and a control group that remained on the usual schedule of unannounced inspections. After adjusting for food type, visible kitchen, outside quality assurance, season, and standardized inspector, significant reductions were found in the odds ratios of personal hygiene (adjusted odds ratios [aOR] = 0.11, p = .00) and equipment cleanliness (aOR = 0.19, p = .00) violations. In the models for the control group, none of the odds ratios were statistically different from one, indicating no change in the postintervention time period as compared to the preintervention period.

  7. Reliability Assessment and Reliability-Based Inspection and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramirez, José Rangel

    actions are the most relevant and effective means of control of deterioration. The risk-based inspection planning methodology, based on Bayesian decision theory, represents an important tool to identify the suitable strategy to inspect and control the deterioration in structures such as offshore wind...... performance during the life cycle. The deterioration processes, such as fatigue and corrosion, are typically affecting offshore structural systems. This damage decreases the system performance and increases the risk of failure, thus not fulfilling the established safety criteria. Inspection and maintenance...... to their offshore location, no pollution risks and low human risks since they are unmanned. This allows the allocation of lower reliability level compared to e.g. oil & gas installations. With the incursion to water depths between 20 and 50 meters, the use of jacket and tripod structures represents a feasible...

  8. Phase-enhanced defect sensitivity for EUV mask inspection

    Science.gov (United States)

    Wang, Yow-Gwo; Miyakawa, Ryan; Chao, Weilun; Goldberg, Kenneth; Neureuther, Andy; Naulleau, Patrick

    2014-10-01

    In this paper, we present a complete study on mask blank and patterned mask inspection utilizing the Zernike phase contrast method. The Zernike phase contrast method provides in-focus inspection ability to study phase defects with enhanced defect sensitivity. However, the 90 degree phase shift in the pupil will significantly reduce the amplitude defect signal at focus. In order to detect both types of defects with a single scan, an optimized phase shift instead of 90 degree on the pupil plane is proposed to achieve an acceptable trade-off on their signal strengths. We can get a 70% of its maximum signal strength at focus for both amplitude and phase defects with a 47 degree phase shift. For SNR, the tradeoff between speckle noise and signal strength has to be considered. The SNR of phase and amplitude defects at focus can both reach 11 with 13 degree phase shift and 50% apodization. Moreover, the simulation results on patterned mask inspection of partially hidden phase defects with die-to-database inspection approach on the blank inspection tool show that the improvement of the Zernike phase method is more limited. A 40% enhancement of peak signal strength can be achieved with the Zernike phase contrast method when the defect is centered in the space, while the enhancement drops to less than 10% when it is beneath the line.

  9. Automated ultrasonic inspection using PULSDAT

    International Nuclear Information System (INIS)

    Naybour, P.J.

    1992-01-01

    PULSDAT (Portable Ultrasonic Data Acquisition Tool) is a system for recording the data from single probe automated ultrasonic inspections. It is one of a range of instruments and software developed by Nuclear Electric to carry out a wide variety of high quality ultrasonic inspections. These vary from simple semi-automated inspections through to multi-probe, highly automated ones. PULSDAT runs under the control of MIPS software, and collects data which is compatible with the GUIDE data display system. PULSDAT is therefore fully compatible with Nuclear Electric's multi-probe inspection systems and utilises all the reliability and quality assurance of the software. It is a rugged, portable system that can be used in areas of difficult access. The paper discusses the benefits of automated inspection and gives an outline of the main features of PULSDAT. Since April 1990 PULSDAT has been used in several applications within Nuclear Electric and this paper presents two examples: the first is a ferritic set-through nozzle and the second is an austenitic fillet weld. (Author)

  10. Risk-Based Maintenance Assessment in the Manufacturing Industry: Minimisation of Suboptimal Prioritisation

    Directory of Open Access Journals (Sweden)

    Ratnayake R.M. Chandima

    2017-03-01

    Full Text Available Manufacturing firms continuously strive to increase the efficiency and effectiveness in the maintenance management processes. Focus is placed on eliminating the unexpected failures which cause unnecessary costs and the production losses. Risk-based maintenance (RBM strategies enable to address the above through the identification of probability and consequences of potential failures whilst providing a way for prioritisation of maintenance actions based on the risk of possible failures. Such prioritisations enable to identify the optimal maintenance strategy, intervals of maintenance tasks, and optimal level of spare parts inventory. However, the risk assessment activities are performed with the support of a risk matrix. Suboptimal classifications and/or prioritisations arise due to the inherent nature of the risk matrix. This is caused by the fact that there are no means to incorporate actual circumstances at the boundary of the input ranges or at the levels of linguistic data and risk categories. In this paper, a risk matrix is first developed in collaboration with one of the manufacturing firms in Poland. Then, it illustrates the use of fuzzy logic for minimisation of suboptimal prioritisation and/or classifications using a fuzzy inference system (FIS together with illustrative membership functions and a rule base. Finally, an illustrative risk assessment is also demonstrated to illustrate the methodology.

  11. Realistic modeling of radiation transmission inspection systems

    International Nuclear Information System (INIS)

    Sale, K.E.

    1993-01-01

    We have applied Monte Carlo particle transport methods to assess a proposed neutron transmission inspection system for checked luggage. The geometry of the system and the time, energy and angle dependence of the source have been modeled in detail. A pulsed deuteron beam incident on a thick Be target generates a neutron pulse with a very broad energy spectrum which is detected after passage through the luggage item by a plastic scintillator detector operating in current mode (as opposed to pulse counting mode). The neutron transmission as a function of time information is used to infer the densities of hydrogen, carbon, oxygen and nitrogen in the volume sampled. The measured elemental densities can be compared to signatures for explosives or other contraband. By using such computational modeling it is possible to optimize many aspects of the design of an inspection system without costly and time consuming prototyping experiments or to determine that a proposed scheme will not work. The methods applied here can be used to evaluate neutron or photon schemes based on transmission, scattering or reaction techniques

  12. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  13. Use of expert judgment in the development and evaluation of risk-based inservice testing strategies for pumps and valves

    Energy Technology Data Exchange (ETDEWEB)

    McAllister, W.J.; Perdue, R.K.; Balkey, K.R.; Closky, N.B. [and others

    1996-12-01

    This paper describes a rigorous approach for quantitatively evaluating inservice testing effectiveness that evolved from two pilot plant studies. These studies prototyped methodologies for designing and selecting inservice testing (IST) strategies in a manner structured to insure that the targeted components will perform their required safety functions while minimizing life cycle inservice testing costs. The paper concentrates on the use of expert judgment in developing test effectiveness measures that move risk-based methods beyond ranking to optimization of plant IST programs. Selected results for check valves and pumps are shown to illustrate the practical significance of the approach.

  14. Use of expert judgment in the development and evaluation of risk-based inservice testing strategies for pumps and valves

    International Nuclear Information System (INIS)

    McAllister, W.J.; Perdue, R.K.; Balkey, K.R.; Closky, N.B.

    1996-01-01

    This paper describes a rigorous approach for quantitatively evaluating inservice testing effectiveness that evolved from two pilot plant studies. These studies prototyped methodologies for designing and selecting inservice testing (IST) strategies in a manner structured to insure that the targeted components will perform their required safety functions while minimizing life cycle inservice testing costs. The paper concentrates on the use of expert judgment in developing test effectiveness measures that move risk-based methods beyond ranking to optimization of plant IST programs. Selected results for check valves and pumps are shown to illustrate the practical significance of the approach

  15. Improvement of foundation for inspection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in{sub -}2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  16. Ultrasonic inspection development at HEDL

    International Nuclear Information System (INIS)

    Day, C.K.; Mech, S.J.; Michaels, T.E.; Dixon, N.E.

    1978-01-01

    Ultrasonic testing methods and equipment are being developed to support preservice and in-service inspection of selected FFTF welds. A digital computer system is employed in the analysis of both simulated FFTF pipe sections and plate specimens containing fatigue cracks. It is anticipated that test evaluation standards containing fatigue cracks will partially eliminate questions formerly associated with weld test calibration producers by providing natural cracks which follow grain boundaries and stress patterns resembling piping situ conditions. Studies have revealed that commercial transducers may satisfy LMFBR ultrasonic pipe inspection applications: The test system evaluation included transducers and wedge coupling and fluid coupling materials which exhibited acceptable performance at temperatures to 2300C. Results are presented that demonstrate the feasibility of ultrasonic inspection of components immersed in sodium at temperatures to 2600C. (UK)

  17. [PICS: pharmaceutical inspection cooperation scheme].

    Science.gov (United States)

    Morénas, J

    2009-01-01

    The pharmaceutical inspection cooperation scheme (PICS) is a structure containing 34 participating authorities located worldwide (October 2008). It has been created in 1995 on the basis of the pharmaceutical inspection convention (PIC) settled by the European free trade association (EFTA) in1970. This scheme has different goals as to be an international recognised body in the field of good manufacturing practices (GMP), for training inspectors (by the way of an annual seminar and experts circles related notably to active pharmaceutical ingredients [API], quality risk management, computerized systems, useful for the writing of inspection's aide-memoires). PICS is also leading to high standards for GMP inspectorates (through regular crossed audits) and being a room for exchanges on technical matters between inspectors but also between inspectors and pharmaceutical industry.

  18. Holography for fast reactor inspection

    International Nuclear Information System (INIS)

    Tozer, B.A.

    1980-01-01

    Holography, an optical process whereby an image of the original subject can be reconstructed in three dimensions, is being developed for use as an optical inspection tool. With a potential information storage density of 10 16 bits/m 2 , the ability to reconstruct in 3 dimensions, a depth of field of up to 8 metres, extremely wide angle of view, and potentially diffraction limited resolution, holography should be invaluable for the optical recording of fast reactors during construction, and the inspection of optically accessible regions during operation, or maintenance down-times. The photographic emulsions used for high resolution holography are fine-grained and fog only very slowly when subjected to γ-radiation, so that inspection of highly radio-active regions and components can be effected satisfactorily. Some of the practical limitations affecting holography are described and ways of overcoming them discussed. Some preliminary results are presented. (author)

  19. Defense Treaty Inspection Readiness Program

    International Nuclear Information System (INIS)

    Cronin, J.J.; Kohen, M.D.; Rivers, J.D.

    1996-01-01

    The Defense Treaty Inspection Readiness Program (DTIRP) was established by the Department of Defense in 1990 to assist defense facilities in preparing for treaty verification activities. Led by the On-Site Inspection Agency (OSIA), an element of the Department of Defense, DTIRP''s membership includes representatives from other Department of Defense agencies, the Department of Energy (DOE), the Central Intelligence Agency, the Federal Bureau of Investigation, the Department of Commerce, and others. The Office of Safeguards and Security has a significant interest in this program, due to the number of national defense facilities within its purview that are candidates for future inspections. As a result, the Office of Safeguards and Security has taken a very active role in DTIRP. This paper discusses the Office of Safeguards and Security''s increasing involvement in various elements of the DTIRP, ranging from facility assessments to training development and implementation

  20. Improvement of foundation for inspection

    International Nuclear Information System (INIS)

    2013-01-01

    Japan Nuclear Energy Safety Organization has been carrying out improvement of inspection system for nuclear plants in Japan since 2003FY. The new inspection system was introduced into nuclear power plants in - 2008FY. In this project, improvement of comprehensive plant performance assessment and management tool for the new inspection system are developed. In 2012FY, a trend analysis method of the plant performance was developed with reference to the IAEA literature. And the trend analysis was tried based on the results of the comprehensive plant performance assessment of all domestic plants except Fukushima-Daiichi Nuclear Power Station. In addition, the teaching materials for QMS training guideline were made. And improvement of a quality management system evaluation support tool was performed. (author)

  1. Risk based test interval and maintenance optimisation - Application and uses

    International Nuclear Information System (INIS)

    Sparre, E.

    1999-10-01

    The project is part of an IAEA co-ordinated Research Project (CRP) on 'Development of Methodologies for Optimisation of Surveillance Testing and Maintenance of Safety Related Equipment at NPPs'. The purpose of the project is to investigate the sensitivity of the results obtained when performing risk based optimisation of the technical specifications. Previous projects have shown that complete LPSA models can be created and that these models allow optimisation of technical specifications. However, these optimisations did not include any in depth check of the result sensitivity with regards to methods, model completeness etc. Four different test intervals have been investigated in this study. Aside from an original, nominal, optimisation a set of sensitivity analyses has been performed and the results from these analyses have been compared to the original optimisation. The analyses indicate that the result of an optimisation is rather stable. However, it is not possible to draw any certain conclusions without performing a number of sensitivity analyses. Significant differences in the optimisation result were discovered when analysing an alternative configuration. Also deterministic uncertainties seem to affect the result of an optimisation largely. The sensitivity of failure data uncertainties is important to investigate in detail since the methodology is based on the assumption that the unavailability of a component is dependent on the length of the test interval

  2. Risk Classification and Risk-based Safety and Mission Assurance

    Science.gov (United States)

    Leitner, Jesse A.

    2014-01-01

    Recent activities to revamp and emphasize the need to streamline processes and activities for Class D missions across the agency have led to various interpretations of Class D, including the lumping of a variety of low-cost projects into Class D. Sometimes terms such as Class D minus are used. In this presentation, mission risk classifications will be traced to official requirements and definitions as a measure to ensure that projects and programs align with the guidance and requirements that are commensurate for their defined risk posture. As part of this, the full suite of risk classifications, formal and informal will be defined, followed by an introduction to the new GPR 8705.4 that is currently under review.GPR 8705.4 lays out guidance for the mission success activities performed at the Classes A-D for NPR 7120.5 projects as well as for projects not under NPR 7120.5. Furthermore, the trends in stepping from Class A into higher risk posture classifications will be discussed. The talk will conclude with a discussion about risk-based safety and mission assuranceat GSFC.

  3. Pedestrian safety management using the risk-based approach

    Directory of Open Access Journals (Sweden)

    Romanowska Aleksandra

    2017-01-01

    Full Text Available The paper presents a concept of a multi-level pedestrian safety management system. Three management levels are distinguished: strategic, tactical and operational. The basis for the proposed approach to pedestrian safety management is a risk-based method. In the approach the elements of behavioural and systemic theories were used, allowing for the development of a formalised and repeatable procedure integrating the phases of risk assessment and response to the hazards of road crashes involving pedestrians. Key to the method are tools supporting pedestrian safety management. According to the risk management approach, the tools can be divided into two groups: tools supporting risk assessment and tools supporting risk response. In the paper attention is paid to selected tools supporting risk assessment, with particular emphasis on the methods for estimating forecasted pedestrian safety measures (at strategic, national and regional level and identification of particularly dangerous locations in terms of pedestrian safety at tactical (regional and local and operational level. The proposed pedestrian safety management methods and tools can support road administration in making rational decisions in terms of road safety, safety of road infrastructure, crash elimination measures or reducing the consequences suffered by road users (particularly pedestrians as a result of road crashes.

  4. Forewarning model for water pollution risk based on Bayes theory.

    Science.gov (United States)

    Zhao, Jun; Jin, Juliang; Guo, Qizhong; Chen, Yaqian; Lu, Mengxiong; Tinoco, Luis

    2014-02-01

    In order to reduce the losses by water pollution, forewarning model for water pollution risk based on Bayes theory was studied. This model is built upon risk indexes in complex systems, proceeding from the whole structure and its components. In this study, the principal components analysis is used to screen out index systems. Hydrological model is employed to simulate index value according to the prediction principle. Bayes theory is adopted to obtain posterior distribution by prior distribution with sample information which can make samples' features preferably reflect and represent the totals to some extent. Forewarning level is judged on the maximum probability rule, and then local conditions for proposing management strategies that will have the effect of transforming heavy warnings to a lesser degree. This study takes Taihu Basin as an example. After forewarning model application and vertification for water pollution risk from 2000 to 2009 between the actual and simulated data, forewarning level in 2010 is given as a severe warning, which is well coincide with logistic curve. It is shown that the model is rigorous in theory with flexible method, reasonable in result with simple structure, and it has strong logic superiority and regional adaptability, providing a new way for warning water pollution risk.

  5. Alternative approaches to risk-based technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.; Liner, R.T.; Lofgren, E.V.

    1987-01-01

    Four alternative risk-based approaches to Technical Specifications are identified. These are: a Probabilistic Risk Assessment (PRA) oriented approach; a reliability goal-oriented approach; an approach based on configuration control; a data-oriented approach. Based on preliminary results, the PRA-oriented approach, which has been developed further than the other approaches, seems to offer a logical, quantitative basis for setting Allowed Outage Times (AOTs) and Surveillance Test Intervals (STIs) for some plant components and systems. The most attractive feature of this approach is that it directly links the AOTs and STIs with the risk associated with the operation of the plant. This would focus the plant operator's and the regulatory agency's attention on the most risk-significant components of the plant. A series of practical issues related to the level of detail and content of the plant PRAs, requirements for the review of these PRAs, and monitoring cf the plant's performance by the regulatory agency must be resolved before the approach could be implemented. Future efforts will examine the other three approaches and their practicality before firm conclusions are drawn regarding the viability of any of these approaches

  6. Fuel channel in-service inspection programs program design for maximum cost effectiveness

    International Nuclear Information System (INIS)

    Van den Brekel, N.C.

    1995-01-01

    Inspection is an integral part of fuel channel life management strategy. Inspection data is used to assess the state of reactor core integrity and provide the information necessary to optimize long term maintenance programs. This paper will provide an overview of the structured approach to developing fuel channel inspection programs within OHN. The inspection programs are designed to balance the resources utilized (cost, outage time, and dose expenditure) with the benefits provided by the inspection data obtained (improved knowledge of component status, degradation mechanisms and rates, etc..). The CANDU community has yet to have a fuel channel operate for a full 30 year design life. Since research programs can not fully simulate reactor operating conditions, inspections become an essential feature of the life management strategy as the components age. Inspection programs often include activities designed to develop predictive capability for long term fuel channel behaviour and provide early warning of changes in behaviour. It should be noted that although this paper addresses the design of fuel channel inspection programs, the basic principles presented can be applied to the design of inspection programs for any major power plant component or system. (author)

  7. Radiation control in the nondestructive inspection

    International Nuclear Information System (INIS)

    Kariya, Yukihiro

    1982-01-01

    In the early days of radiation nondestructive inspection about ten years ago, the loss of radiation sources and careless radiation exposure gave the impression of radiography inspection being immediately slipshod management. In this problem, the peculiar nature of the business in this field is involved. In Nondestructive Inspection Co., Ltd., besides the safety management of radioisotopes, the radiation exposure control of personnel in the regular inspection of nuclear power plants has become increasingly important. The following matters are described: radiation utilization in nondestructive inspection (X- and #betta#-ray radiography, #betta#-ray leak test on shield), radiation control problems in nondestructive inspection business (the peculiar aspects of the business, the analysis of the incidents related with nondestructive inspection), and the practice of radiation control in nondestructive inspection in Nondestructive Inspection Co., Ltd. (Mori, K.)

  8. Rail inspection of RCF defects

    Directory of Open Access Journals (Sweden)

    Z. Popović

    2013-10-01

    Full Text Available Rail defects due to rolling contact fatigue (RCF threaten the traffic safety around the world. That hazard is more distinct on railways without adequate maintenance strategy. Realization of interoperability of European railway network demands from every infrastructure manager to have a maintenance plan for the infrastructure subsystem. Besides that, this plan includes rail inspection and strategy against RCF defects. This paper emphasizes the importance of rail inspection and early detection of RCF because the most of RCF crack should be removed in rail grinding campaigns (preventive, cyclical and corrective activities during the whole rail service life.

  9. Evaluation of inservice inspection examinatiions

    International Nuclear Information System (INIS)

    Aldrich, D.A.; Cook, J.F.

    1990-05-01

    In order to evaluate the effectiveness of Section 11, Division 1, ''Rules for Inservice Inspection of Nuclear Power Plant Components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended

  10. Guided acoustic wave inspection system

    Science.gov (United States)

    Chinn, Diane J.

    2004-10-05

    A system for inspecting a conduit for undesirable characteristics. A transducer system induces guided acoustic waves onto said conduit. The transducer system detects the undesirable characteristics of the conduit by receiving guided acoustic waves that contain information about the undesirable characteristics. The conduit has at least two sides and the transducer system utilizes flexural modes of propagation to provide inspection using access from only the one side of the conduit. Cracking is detected with pulse-echo testing using one transducer to both send and receive the guided acoustic waves. Thinning is detected in through-transmission testing where one transducer sends and another transducer receives the guided acoustic waves.

  11. Holographic inspection of nuclear plant

    International Nuclear Information System (INIS)

    Gordon, A.L.; Armour, I.A.; Glanville, R.; Malcolm, G.J.; Wright, D.G.

    1988-01-01

    The high resolution, enormous depth of field and high tolerance to radiation of holography mean that it has great potential as an inspection tool in the nuclear industry. In addition, the ability of double-pulse holography to yield detailed information on vibration over the whole field of both large and small structures provides measurements that often cannot be obtained in any other way. This paper reviews the development of equipment for the holographic inspection of nuclear fuel elements; a portable holocamera for use inside reactors; and the application of holographic techniques for vibration measurements in a nuclear power station. (author)

  12. RIMACS, Reactor Inspection Main Control System

    International Nuclear Information System (INIS)

    2008-01-01

    1 - Description of program or function: RIMACS prepares for automatic inspection files on each inspection item for the reactor. These automatic inspection files provide the data to move RIROB (Reactor Inspection Robot) with laser by interpreting the coordinates of LASPO (Laser Positioner) and the laser detecting device of RIROB in three dimensional space. In addition, when RIROB arrives at the inspecting location, the files provide all values of the manipulator's motions to acquire the ultrasonic data. RIMACS provides various modules in order to perform these complex functions, and the functions are programmed on graphic user interface for the convenience of the user. RIMACS provides various functions, such as insertion of reactor production data, selection of the reactor for inspection, the creation of automatic inspection file, the selection of the inspection item, inspection simulation, and automatic inspection procedures. It also provides all other functions, which are necessary for the inspection, such as operating program download and manual control of LASPO and RIROB, the inspection simulation and the inspection status display by means of the graphic screen, and SODAS (ultra-Sonic Data Acquisition System) drive verification. 2 - Methods: Moving path and operation procedures for inspection robot are generated automatically with Kinematics algorithm. 3 - Restrictions on the complexity of the problem: A graphics display with MS-Window capability is required

  13. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  14. A Stochastic Model to Assess the Effect of Meat Inspection Practices on the Contamination of the Pig Carcasses

    DEFF Research Database (Denmark)

    de Freitas Costa, Eduardo; Corbellini, Luis Gustavo; da Silva, Ana Paula Serafini Poeta

    2017-01-01

    The objective of meat inspection is to promote animal and public health by preventing, detecting, and controlling hazards originating from animals. With the improvements of sanitary level in pig herds, the hazards profile has shifted and the inspection procedures no longer target major foodborne...... pathogens (i.e., not risk based). Additionally, carcass manipulations performed when searching for macroscopic lesions can lead to cross-contamination. We therefore developed a stochastic model to quantitatively describe cross-contamination when consecutive carcasses are submitted to classic inspection...... procedures. The microbial hazard used to illustrate the model was Salmonella, the data set was obtained from Brazilian slaughterhouses, and some simplifying assumptions were made. The model predicted that due to cross-contamination during inspection, the prevalence of contaminated carcass surfaces increased...

  15. Replacement and inspection policies for products with random life cycle

    International Nuclear Information System (INIS)

    Yun, Won Young; Nakagawa, Toshio

    2010-01-01

    In this paper, we consider maintenance policies for products in which the economical life cycle of products is a random variable. First, we study a periodic replacement policy with minimal repair. The system is minimally repaired at failure and is replaced by new one at age T (periodic replacement policy with minimal repair of Barlow and Hunter). The expected present value of total maintenance cost of products with random life cycle is obtained and the optimal replacement interval minimizing the cost is found. Second, we consider an inspection policy for products with random life cycle to detect the system failure. The expected total cost is obtained and the optimal inspection interval is found. Numerical examples are also included.

  16. Inspection of complex geometry pieces with an intelligent contact transducer

    International Nuclear Information System (INIS)

    Chatillon, S.; Roy, O.; Mahaut, St.

    2000-01-01

    A new multi-element contact transducer has been developed to improve the inspection of components with complex geometry. The emitting surface is flexible in order to optimize the contact with pieces. An algorithm, based on a simplified geometric model, has been used to determine the delays law which allows to control the focal characteristics of the transmitted field. Acquisition data lead in transmission with an articulated transducer validate the behavior provided by simulation. Thus the optimization of the delays law ensures the transmission of a beam which is homogeneous and controlled during the moving of the transducer. Inspections in echo-pulse mode are implemented on a sample simulating a component controlled on site. Results show that the dynamical adaptation of the delays law to the geometry of the piece leads to very good performances

  17. Design and optimization of the low frequency eddy current technique for the volumetric inspection of austenitic small diameter tubes with a wall thickness up to 12 mm; Auslegung und Optimierung des Niederfrequenz-Wirbelstrom-Verfahrens fuer die volumetrische Pruefung von austenitischen Neben- und Kleinleitungen mit Wandstaerken bis 12 mm

    Energy Technology Data Exchange (ETDEWEB)

    Becker, R; Bessert, S; Disque, M; Weiss, R [Fraunhofer-Institut fuer Zerstoerungsfreie Pruefverfahren, Saarbruecken (Germany)

    1998-11-01

    The low-frequency eddy current technique discussed is a suitable external inspection technique detecting defects at the inner walls of small-diameter tubes and measuring their depths via the ligament. A testing system with optimized sensor lus software for image recording, evaluation, display and documentation is available. The current state of development of the system permits detection and measurement of defects up to 20 mm in size in austenitic inner walls 12.5 mm thick down to a depth of 3 mm. This applies both to the homogenous base metal and the weld with {delta} ferrite. (orig./CB) [Deutsch] Das vorgestellte Niederfrequenz-Wirbelstrom-Verfahren ist geeignet, bei Pruefung von aussen Fehler an der Innenseite von Klein- und Nebenleitungen nachzuweisen und ueber das Ligament deren Tiefe zu bestimmen. Ein entsprechendes Pruefsystem mit optimiertem Sensor und der Software zur Aufnahme, Auswertung, Darstellung und Dokumentation der Wirbelstrom-Urdaten steht zur Verfuegung. Beim jetzigen Entwicklungsstand liegt die Nachweisgrenze fuer einen 20 mm langen Innenfehler in einer 12.5 mm dicken austenitischen Wandung bei einer Fehlertiefe von 3 mm. Dies gilt sowohl fuer den homogenen Grundwerkstoff als auch fuer Schweissgefuege mit {delta}-Ferrit. (orig./MM)

  18. Risk-based decision making to manage water quality failures caused by combined sewer overflows

    Science.gov (United States)

    Sriwastava, A. K.; Torres-Matallana, J. A.; Tait, S.; Schellart, A.

    2017-12-01

    Regulatory authorities set certain environmental permit for water utilities such that the combined sewer overflows (CSO) managed by these companies conform to the regulations. These utility companies face the risk of paying penalty or negative publicity in case they breach the environmental permit. These risks can be addressed by designing appropriate solutions such as investing in additional infrastructure which improve the system capacity and reduce the impact of CSO spills. The performance of these solutions is often estimated using urban drainage models. Hence, any uncertainty in these models can have a significant effect on the decision making process. This study outlines a risk-based decision making approach to address water quality failure caused by CSO spills. A calibrated lumped urban drainage model is used to simulate CSO spill quality in Haute-Sûre catchment in Luxembourg. Uncertainty in rainfall and model parameters is propagated through Monte Carlo simulations to quantify uncertainty in the concentration of ammonia in the CSO spill. A combination of decision alternatives such as the construction of a storage tank at the CSO and the reduction in the flow contribution of catchment surfaces are selected as planning measures to avoid the water quality failure. Failure is defined as exceedance of a concentration-duration based threshold based on Austrian emission standards for ammonia (De Toffol, 2006) with a certain frequency. For each decision alternative, uncertainty quantification results into a probability distribution of the number of annual CSO spill events which exceed the threshold. For each alternative, a buffered failure probability as defined in Rockafellar & Royset (2010), is estimated. Buffered failure probability (pbf) is a conservative estimate of failure probability (pf), however, unlike failure probability, it includes information about the upper tail of the distribution. A pareto-optimal set of solutions is obtained by performing mean

  19. Risk Based Milk Pricing Model at Dairy Farmers Level

    Directory of Open Access Journals (Sweden)

    W. Septiani

    2017-12-01

    Full Text Available The milk price from a cooperative institution to farmer does not fully cover the production cost. Though, dairy farmers encounter various risks and uncertainties in conducting their business. The highest risk in milk supply lies in the activities at the farm. This study was designed to formulate a model for calculating milk price at farmer’s level based on risk. Risks that occur on farms include the risk of cow breeding, sanitation, health care, cattle feed management, milking and milk sales. This research used the location of the farm in West Java region. There were five main stages in the preparation of this model, (1 identification and analysis of influential factors, (2 development of a conceptual model, (3 structural analysis and the amount of production costs, (4 model calculation of production cost with risk factors, and (5 risk based milk pricing model. This research built a relationship between risks on smallholder dairy farms with the production costs to be incurred by the farmers. It was also obtained the formulation of risk adjustment factor calculation for the variable costs of production in dairy cattle farm. The difference in production costs with risk and the total production cost without risk was about 8% to 10%. It could be concluded that the basic price of milk proposed based on the research was around IDR 4,250-IDR 4,350/L for 3 to 4 cows ownership. Increasing farmer income was expected to be obtained by entering the value of this risk in the calculation of production costs. 

  20. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  1. Inservice Inspection in the Fugen

    OpenAIRE

    1983-01-01

    Pressure tube type reactors have specific components orstructures,compared with light water reactors.They are(1) steam drums(2) reactor inlet headers(3) reactor inlet and outlet pipies(4) pressure tubes.Much attention is paid upon Inservice Inspection (ISI)of the above components.

  2. Nuclear fuel shipping inspection device

    International Nuclear Information System (INIS)

    Takahashi, Toshio; Hada, Koji.

    1988-01-01

    Purpose: To provide an nuclear fuel shipping inspection device having a high detection sensitivity and capable of obtaining highly reliable inspection results. Constitution: The present invention concerns a device for distinguishing a fuel assembly having failed fuel rods in LMFBR type reactors. Coolants in a fuel assembly to be inspected are collected by a sampling pipeway and transferred to a filter device. In the filter device, granular radioactive corrosion products (CP) in the coolants are captured, to reduce the background. The coolants, after being passed through the filter device, are transferred to an FP catching device and gamma-rays of iodine and cesium nuclides are measured in FP radiation measuring device. Subsequently, the coolants transferred to a degasing device to separate rare gas FP in the coolants from the liquid phase. In a case if rare gas fission products are detected by the radiation detector, it means that there is a failed fuel rod in the fuel assembly to be inspected. Since the CP and the soluble FP are separated and extracted for the radioactivity measurement, the reliability can be improved. (Kamimura, M.)

  3. FAA Fluorescent Penetrant Laboratory Inspections

    Energy Technology Data Exchange (ETDEWEB)

    WINDES,CONNOR L.; MOORE,DAVID G.

    2000-08-02

    The Federal Aviation Administration Airworthiness Assurance NDI Validation Center currently assesses the capability of various non-destructive inspection (NDI) methods used for analyzing aircraft components. The focus of one such exercise is to evaluate the sensitivity of fluorescent liquid penetrant inspection. A baseline procedure using the water-washable fluorescent penetrant method defines a foundation for comparing the brightness of low cycle fatigue cracks in titanium test panels. The analysis of deviations in the baseline procedure will determine an acceptable range of operation for the steps in the inspection process. The data also gives insight into the depth of each crack and which step(s) of the inspection process most affect penetrant sensitivities. A set of six low cycle fatigue cracks produced in 6.35-mm thick Ti-6Al-4V specimens was used to conduct the experiments to produce sensitivity data. The results will document the consistency of the crack readings and compare previous experiments to find the best parameters for water-washable penetrant.

  4. Artificial Intelligence Assists Ultrasonic Inspection

    Science.gov (United States)

    Schaefer, Lloyd A.; Willenberg, James D.

    1992-01-01

    Subtle indications of flaws extracted from ultrasonic waveforms. Ultrasonic-inspection system uses artificial intelligence to help in identification of hidden flaws in electron-beam-welded castings. System involves application of flaw-classification logic to analysis of ultrasonic waveforms.

  5. Surveillance test interval optimization

    International Nuclear Information System (INIS)

    Cepin, M.; Mavko, B.

    1995-01-01

    Technical specifications have been developed on the bases of deterministic analyses, engineering judgment, and expert opinion. This paper introduces our risk-based approach to surveillance test interval (STI) optimization. This approach consists of three main levels. The first level is the component level, which serves as a rough estimation of the optimal STI and can be calculated analytically by a differentiating equation for mean unavailability. The second and third levels give more representative results. They take into account the results of probabilistic risk assessment (PRA) calculated by a personal computer (PC) based code and are based on system unavailability at the system level and on core damage frequency at the plant level

  6. Selecting a risk-based tool to aid in decision making

    Energy Technology Data Exchange (ETDEWEB)

    Bendure, A.O.

    1995-03-01

    Selecting a risk-based tool to aid in decision making is as much of a challenge as properly using the tool once it has been selected. Failure to consider customer and stakeholder requirements and the technical bases and differences in risk-based decision making tools will produce confounding and/or politically unacceptable results when the tool is used. Selecting a risk-based decisionmaking tool must therefore be undertaken with the same, if not greater, rigor than the use of the tool once it is selected. This paper presents a process for selecting a risk-based tool appropriate to a set of prioritization or resource allocation tasks, discusses the results of applying the process to four risk-based decision-making tools, and identifies the ``musts`` for successful selection and implementation of a risk-based tool to aid in decision making.

  7. A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Zhai, Qingqing; Zhao, Yu

    2016-01-01

    We propose an inspection and replacement policy for a single component system that successively executes missions with random durations. The failure process of the system can be divided into two states, namely, normal and defective, following the delay time concept. Inspections are carried out periodically and immediately after the completion of each mission (random inspections). The failed state is always identified immediately, whereas the defective state can only be revealed by an inspection. If the system fails or is defective at a periodic inspection, then replacement is immediate. If, however, the system is defective at a random inspection, then replacement will be postponed if the time to the subsequent periodic inspection is shorter than a pre-determined threshold, and immediate otherwise. We derive the long run expected cost per unit time and then investigate the optimal periodic inspection interval and postponement threshold. A numerical example is presented to demonstrate the applicability of the proposed maintenance policy. - Highlights: • A delay time model of inspection is introduced for mission-based systems. • Periodic and random inspections are performed to check the state. • Replacement of the defective system at a random inspection can be postponed.

  8. Automated reticle inspection data analysis for wafer fabs

    Science.gov (United States)

    Summers, Derek; Chen, Gong; Reese, Bryan; Hutchinson, Trent; Liesching, Marcus; Ying, Hai; Dover, Russell

    2009-04-01

    To minimize potential wafer yield loss due to mask defects, most wafer fabs implement some form of reticle inspection system to monitor photomask quality in high-volume wafer manufacturing environments. Traditionally, experienced operators review reticle defects found by an inspection tool and then manually classify each defect as 'pass, warn, or fail' based on its size and location. However, in the event reticle defects are suspected of causing repeating wafer defects on a completed wafer, potential defects on all associated reticles must be manually searched on a layer-by-layer basis in an effort to identify the reticle responsible for the wafer yield loss. This 'problem reticle' search process is a very tedious and time-consuming task and may cause extended manufacturing line-down situations. Often times, Process Engineers and other team members need to manually investigate several reticle inspection reports to determine if yield loss can be tied to a specific layer. Because of the very nature of this detailed work, calculation errors may occur resulting in an incorrect root cause analysis effort. These delays waste valuable resources that could be spent working on other more productive activities. This paper examines an automated software solution for converting KLA-Tencor reticle inspection defect maps into a format compatible with KLA-Tencor's Klarity Defect(R) data analysis database. The objective is to use the graphical charting capabilities of Klarity Defect to reveal a clearer understanding of defect trends for individual reticle layers or entire mask sets. Automated analysis features include reticle defect count trend analysis and potentially stacking reticle defect maps for signature analysis against wafer inspection defect data. Other possible benefits include optimizing reticle inspection sample plans in an effort to support "lean manufacturing" initiatives for wafer fabs.

  9. A modelling framework for mitigating customers' waiting time at a vehicle inspection centre

    Science.gov (United States)

    Ahmad, Norazura; Abidin, Norhaslinda Zainal; Ilyas, Khibtiyah; Abduljabbar, Waleed Khalid

    2017-11-01

    In Malaysia, an agency that is entrusted by the Government to perform mandatory vehicle inspection for public, commercial and private vehicles, receive many customers daily. Often complaints of problems received from the customers are associated with waiting time that leads to lost of business and dissatisfied customers. To address this issue, we propose a framework for modelling a vehicle inspection system using an integration of simulation and optimization approaches. The strengths of simulation and optimization are reviewed briefly that is hoped to reveal the synergy between the established methods in determining an appropriate customer's waiting time for inspection at a vehicle inspection centre. Relevant concepts and preliminary results are also presented and discussed in this paper.

  10. 49 CFR 213.365 - Visual inspections.

    Science.gov (United States)

    2010-10-01

    ... initiate remedial action. (e) Each switch, turnout, track crossing, and lift rail assemblies on moveable bridges shall be inspected on foot at least weekly. The inspection shall be accomplished in accordance...

  11. CAT -- computer aided testing for resonant inspection

    International Nuclear Information System (INIS)

    Foley, David K.

    1998-01-01

    Application of computer technology relates to inspection and quality control. The computer aided testing (CAT) can be used to analyze various NDT technologies, such as eddy current, ultrasonics, and resonant inspection

  12. Allegheny County Housing and Community Environment Inspections

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Residential housing inspections and inspections in response to complaints for community environment problems, such as open vacant structures, vacant lots with...

  13. Machine vision inspection of railroad track

    Science.gov (United States)

    2011-01-10

    North American Railways and the United States Department of Transportation : (US DOT) Federal Railroad Administration (FRA) require periodic inspection of railway : infrastructure to ensure the safety of railway operation. This inspection is a critic...

  14. Allegheny County Weights and Measures Inspections

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Inspections conducted by the Allegheny County Bureau of Weights and Measures. The Bureau inspects weighing and timing devices such as gas pumps, laundromat timers,...

  15. The evidence base for school inspection frameworks

    NARCIS (Netherlands)

    Scheerens, Jaap; Ehren, Melanie Catharina Margaretha; Ehren, Melanie C.M.

    2016-01-01

    This chapter describes how Inspectorates of Education operationalize different inspection goals (control, improvement, and liaison) in their inspection indicator frameworks. The chapter provides an overview and examples of the indicators used across a number of countries and how these are

  16. The use of risk indicators for establishing inspection and control priorities

    International Nuclear Information System (INIS)

    Alzbutas, R.; Klimasauskas, A.; Nedzinskas, L.

    2003-01-01

    Risk-informed approach used to support decision-making related to in-service inspections was considered in order to identify ways for establishing inspection and control priorities. The in-service inspection of piping in the Ignalina NPP has been selected as the object for research application, The inspection process studied was modelled using the integration of deterministic and probabilistic analysis methods, In order to optimize the inspection process, the focus was set on the highest risk measured as the conditional core damage frequency, It was produced by quantitatively estimated probabilities of different degradation states and conditional failure consequence probabilities, Comprehensive databases for calculation of such indicators (measures) were collected and analyzed, The failure statistical analysis as well as the evaluation of inspection efficiency expressed by the probability of defect detection was also used, The databases were further investigated with a closer attention to the data variation and comparison of risk measures using the developed software, The developed software was used to perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis, The risk measures helped to define an adequate inspection program and to focus inspections on the more important locations of the study systems, This approach allowed an optimisation of the inspection program while the probabilistic and fundamental deterministic safety requirements were maintained, The approaches to define an acceptable level of the inspection program were also considered. These approaches to define an acceptable risk were considered together with the means to reduce the number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk, The investigated issues provided a good basis for drawing conclusions about the inspection priorities, to

  17. Analysis of risk of nonconformities and applied quality inspection methods in the process of aluminium profiles coating based on FMEA results

    Directory of Open Access Journals (Sweden)

    Krzysztof Knop

    2017-10-01

    Full Text Available The article presents the results of risk analysis associated with nonconformities of aluminium profiles in the process of coating and quality inspection methods used to their detection. Analysis of risk was done based on results of FMEA method. Evaluated quality inspection methods were distinguished based on the term of inspection in the ISO 9000:2005 norm. Manufacturing process of aluminium profile in micro-technological approach was presented. Triple quantification of nonconformities risk based on the FMEA method by using three different approaches was conducted. Analysis of nonconformities risks associated with the use of specific quality inspection methods was done. In the last part the analysis of causes of critical nonconformities, proposals for improvement actions reducing the risk of the critical nonconformities and applied critical quality inspection method were showed.

  18. Remote inspection system for nuclear power plants

    International Nuclear Information System (INIS)

    Inagaki, K.; Fujii, M.; Doi, A.; Harima, T.

    1977-01-01

    A remote inspection system for nuclear power plants was constructed based on an analysis of inspections performed by an operator on patrol. This system consists of an operator's console and a remote station. The remote station, equipped with five kinds of sensors, is steered along the inspection route by a photoelectric guiding system or may be manually controlled from an operator's console in a main control room. Signals for control and inspection data are multiplexed and transmitted through a coaxial cable

  19. Experimental Stress Analysis at Railway Inspection Pit

    Directory of Open Access Journals (Sweden)

    Nicuşor Laurentiu Zaharia

    2008-10-01

    Full Text Available Railway inspection pits are used in railway halls. The purpose of inspection pits is to allow the working under the vehicle. Inspection pits can be found in locomotive depots, factories etc. The new design for a inspection pit in a railway hall involve tests in purpose of homologations the railway infrastructure. Before the homologation committee meeting, tests are made; after the test, a testing report is made which it will be part at homologation documents.

  20. 49 CFR 396.13 - Driver inspection.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS INSPECTION, REPAIR, AND MAINTENANCE § 396.13 Driver inspection. Before driving a motor vehicle, the driver shall: (a) Be satisfied that the motor vehicle is in safe operating condition; (b) Review the last driver vehicle inspection...