  1. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  2. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  3. Site operator program final report for fiscal years 1992 through 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1998-01-01

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

  4. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  5. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  6. Operator programs and operator processes

    NARCIS (Netherlands)

    Bergstra, J.A.; Walters, P.

    2003-01-01

    We define a notion of program which is not a computer program but an operator program: a detailed description of actions performed and decisions taken by a human operator (computer user) performing a task to achieve a goal in a simple setting consisting of that user, one or more computers and a

  7. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  8. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  9. Status of an operating reliability program

    International Nuclear Information System (INIS)

    Johnson, R.A.

    1985-01-01

    This paper deals with productivity improvement programs (PIP) for nuclear generating plants. The PIP was implemented in 1979 as a joint effort between Commonwealth Edison's (CECo's) operating nuclear stations and the Station Nuclear Engineering Department. Goals were set to reduce nonproductivity by 10% over a 5 year period. This goal was accomplished December 31, 1983. Topics of discussion are program method, problem analysis and resolution, program results, program improvements, and proposed additions to the PIP. The program is providing CECo with greater electrical generating productivity

  10. Allied-General operator training program

    International Nuclear Information System (INIS)

    Ayers, A.L.; Ebel, P.E.

    1975-01-01

    All operators at Allied-General Nuclear Services are initially trained in the basic concepts of radiation and radiation protection, they are drilled in the basic technical tools needed for further training, they are instructed in the design and operation of the Barnwell Nuclear Fuel Plant, and they are introduced to the actual operations via operating procedures. This all occurs during the Before-the-Baseline training phase and then the operators move on Beyond-the-Baseline. There they physically learn how to do their job at their own pace using checklists as a guide. All operators are then internally certified. Progression is based on demonstrated ability and those that qualify go on to jobs requiring NRC licenses. Upon internal certification, retraining commences immediately and will continue in its four month, one year, and two year cycles. Current feedback from the various classes that have completed the courses and are now in the retraining program indicates that this combination of initial technical training, on-the-job training, and retraining will produce and maintain effective, safe, and efficient operators

  11. Achieving High Reliability Operations Through Multi-Program Integration

    Energy Technology Data Exchange (ETDEWEB)

    Holly M. Ashley; Ronald K. Farris; Robert E. Richards

    2009-04-01

    Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INL’s primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

  12. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  13. 0 + 5 Vascular Surgery Residents' Operative Experience in General Surgery: An Analysis of Operative Logs from 12 Integrated Programs.

    Science.gov (United States)

    Smith, Brigitte K; Kang, P Chulhi; McAninch, Chris; Leverson, Glen; Sullivan, Sarah; Mitchell, Erica L

    2016-01-01

    Integrated (0 + 5) vascular surgery (VS) residency programs must include 24 months of training in core general surgery. The Accreditation Council for Graduate Medical Education currently does not require specific case numbers in general surgery for 0 + 5 trainees; however, program directors have structured this time to optimize operative experience. The aim of this study is to determine the case volume and type of cases that VS residents are exposed to during their core surgery training. Accreditation council for graduate medical education operative logs for current 0 + 5 VS residents were obtained and retrospectively reviewed to determine general surgery case volume and distribution between open and laparoscopic cases performed. Standard statistical methods were applied. A total of 12 integrated VS residency programs provided operative case logs for current residents. A total of 41 integrated VS residents in clinical years 2 through 5. During the postgraduate year-1 training year, residents participated in significantly more open than laparoscopic general surgery cases (p surgery cases are hernia repair (20%), skin and soft tissue (7.4%), and breast (6.3%). Residents in programs with core surgery over 3 years participated in significantly more general surgery operations compared with residents in programs with core surgery spread out over 4 years (p = 0.035). 0 + 5 VS residents perform significantly more open operations than laparoscopic operations during their core surgery training. The majority of these operations are minor, nonabdominal procedures. The 0 + 5 VS residency program general surgery operative training requirements should be reevaluated and case minimums defined. The general surgery training component of 0 + 5 VS residencies may need to be restructured to meet the needs of current and future trainees. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  14. Milwaukee Parental Choice Program. First Year Report.

    Science.gov (United States)

    Witte, John F.

    A preliminary evaluation and report were conducted of the Milwaukee (Wisconsin) Public Schools' (MPS) Parental Choice Program (PCP) following its first year of operation. The state legislated program provides an opportunity for students meeting specific criteria to attend private, non-sectarian schools in Milwaukee. A payment from public funds…

  15. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  16. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  17. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  18. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, October--December 1995 (first quarter of fiscal year 1996)

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1996-03-01

    This is the Site Operator Program quarterly report for USDOE electric and hybrid vehicle research. Its mission now includes the three major activity categories of advancement of electric vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use and increasing public awareness and acceptance of EVs. The 11 Site Operator Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of the site operators totals about 250 vehicles. The individual fleets are summarized.

  19. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  20. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  1. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  2. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H.; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2010-01-01

    The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards

  3. Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the 2-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These 2 programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  4. Operator interface programs for KSTAR operation

    International Nuclear Information System (INIS)

    Lee, Sangil; Park, Mikyung; Park, Jinseop; Na, Hoonkyun; Kwon, M.

    2013-01-01

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system

  5. Operator interface programs for KSTAR operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sangil, E-mail: leesi@nfri.re.kr; Park, Mikyung, E-mail: mkpark@nfri.re.kr; Park, Jinseop, E-mail: linupark@nfri.re.kr; Na, Hoonkyun, E-mail: hkna@nfri.re.kr; Kwon, M., E-mail: kwonm@nfri.re.kr

    2013-11-15

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system.

  6. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  7. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  8. Atlantic Richfield Hanford Company chemical operator training program

    International Nuclear Information System (INIS)

    Zumhoff, R.G.

    1975-01-01

    Formal training and testing of Chemical Operators at Hanford were initiated as part of a negotiated union settlement in 1966. Consequently, it was agreed that 25 percent of the chemical operator force would receive a higher rated job (Lead Nuclear Chemical Operator) provided they satisfactorily completed a training program including testing. The training and testing program was developed in two parts. The first covered subjects of a general nature and was applicable to an operator's duties no matter what the assignment. Part II was more specifically oriented to the presently assigned work area. Renewed interest in retraining and requalification of all chemical operators was taken in 1971. This evolved from a Company concern that a program be developed to assure the fact that operators were qualified to do their assigned jobs, and an Atomic Energy Commission request for an outline of a retraining and requalification program for chemical operators. Building upon the experience gained in the LNCO (Lead Nuclear Chemical Operator) program, the two part format is retained. The use of video tapes is used to complement the manuals. An arrangement where an operator can view a lecture-type presentation is provided in seven plant locations. A small studio for in-house production of the video tapes is available to the training Specialists. A script is developed from a training manual by condensing the information into 20-minute presentations. A prime objective of each tape is to highlight the safety and control aspects that accompany operator responsibilities in each of these areas. Testing is also handled on a two part basis; one test covers the fundamentals and a separate test is designed for each of the plant subjects. A walk-through examination is also performed for the plant portion. Operators are required to be requalified on emergency procedures on an annual basis and at two-year intervals in the other areas. (U.S.)

  9. Space Shuttle Program (SSP) Dual Docked Operations (DDO)

    Science.gov (United States)

    Sills, Joel W., Jr.; Bruno, Erica E.

    2016-01-01

    This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

  10. Field Operations Program Neighborhood Electric Vehicles - Fleet Survey

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward; Carroll, M.

    2001-07-01

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles(NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog- forming emissions annually.

  11. Field Operations Program - Neighborhood Electric Vehicle Fleet Use

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J. E.; Carroll, M. R.

    2001-07-02

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles (NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog-forming emissions annually.

  12. 50 CFR 253.18 - Program operating guidelines.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Program operating guidelines. 253.18 Section 253.18 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC... Guarantee Program § 253.18 Program operating guidelines. The Division may issue Program operating guidelines...

  13. The Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the two-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These two programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  14. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  15. LOFT Augmented Operator Capability Program

    International Nuclear Information System (INIS)

    Hollenbeck, D.A.; Krantz, E.A.; Hunt, G.L.; Meyer, O.R.

    1980-01-01

    The outline of the LOFT Augmented Operator Capability Program is presented. This program utilizes the LOFT (Loss-of-Fluid Test) reactor facility which is located at the Idaho National Engineering Laboratory and the LOFT operational transient experiment series as a test bed for methods of enhancing the reactor operator's capability for safer operation. The design of an Operational Diagnotics and Display System is presented which was backfit to the existing data acquisition computers. Basic color-graphic displays of the process schematic and trend type are presented. In addition, displays were developed and are presented which represent safety state vector information. A task analysis method was applied to LOFT reactor operating procedures to test its usefulness in defining the operator's information needs and workload

  16. Operational experience using the OSTR flip fuel self-protection program

    International Nuclear Information System (INIS)

    Dodd, B.; Ringle, J.C.; Anderson, T.V.; Johnson, A.G.

    1982-01-01

    Recent changes in NRC Physical Security regulations make it highly desirable for a small number of TRIGA research reactor establishments to maintain each of the fuel elements in their reactor core above the self-protection dose rate criterion. OSTR operations personnel have written a computer program (SPOOF) which calculates the exposure rate (in Rhr -1 ) from an irradiated fuel element at 3 feet in air using the actual operating history of the reactor. The purpose of this current paper is to describe the operational experience gained over the last year and a half while using the SPOOF computer program, and while performing the quarterly dose rate measurements needed to confirm the continuing accuracy of the program, and, most importantly, the self-protection status of the OSTR fuel. The computer program in association with the quarterly dose rate measurements have been accepted by the NRC, and allow the OSTR to take credit for self-protecting FLIP fuel under the current physical security regulations

  17. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  18. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  19. Light Water Reactor Sustainability Research and Development Program Plan. Fiscal Year 2009-2013

    International Nuclear Information System (INIS)

    2009-01-01

    Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R and D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R and D programs. The purpose of the LWRS R and D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R and D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its

  20. DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

  1. Ecological Monitoring and Compliance Program Fiscal Year 1999 Report

    Energy Technology Data Exchange (ETDEWEB)

    Cathy A. Wills

    1999-12-01

    The Ecological and Compliance program, funded through the U. S. Department of Energy, Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1999. Program activities included: (1) biological surveys at proposed construction sites (2) desert tortoise compliance (3) ecosystem mapping (4) sensitive species and unique habitat monitoring and (5) biological monitoring at the HAZMAT Spill Center.

  2. State Energy Program Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Office of Building Technology, State and Community Programs

    1999-03-17

    The State Energy Program Operations Manual is a reference tool for the states and the program officials at the U.S. Department of Energy's Office of Building Technology, State and Community Programs and Regional Support Offices as well as State Energy Offices. The Manual contains information needed to apply for and administer the State Energy Program, including program history, application rules and requirements, and program administration and monitoring requirements.

  3. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  4. An operational health physics quality assurance program

    International Nuclear Information System (INIS)

    Costigan, S.A.; McAtee, J.L. III; Somers, W.M.; Huchton, R.L.

    1996-01-01

    DOE Order 5700.6C, Quality Assurance, stipulates QA requirements for all DOE activities. This order is now codified as 10CFR830.120, Nuclear Safety Management, Quality Assurance Requirements, which is applicable to DOE nuclear facilities. A Quality Assurance Management Plan (QAMP) was developed by the Health Physics Operations Group (ESH-1) at Los Alamos National Laboratory (LANL). The goal of the ESH-1 QAMP is to ensure that operational radiation protection activities meet the criteria outlined in DOE Order 5700.6C, DOE-ER-STD-6001-92 and 10CFR830.120. The ten required elements are QA Program, Personal Training and Qualifications, Quality Improvement, Documents and Records, Work Processes, Design, Procurement, Inspection and Acceptance Testing, Management Assessment and Independent Assessment. The QAMP has been useful for the development of QAMPs at nuclear facilities and has helped ensure uniformity of institutional requirements where Health Physics services are deployed to facilities. To implement a subset of QAMP requirements, a Quality Assurance Self-Evaluation Program (QASE) was established. This program provides a novel self-audit mechanism for the formal identification and correction of non-conforming items related to Operational Health Physics. Additionally, the QASE is a useful management tool for Radiological Control Technician Supervisors and staff and provides a tracking mechanism for ongoing problem areas. Data have been Collected for two calendar years on a number of concerns that fall into four general categories: radiological posting and labeling, instrumentation, monitoring requirements, and radiological documents/records

  5. Light Water Reactor Sustainability Research and Development Program Plan -- Fiscal Year 2009–2013

    Energy Technology Data Exchange (ETDEWEB)

    Idaho National Laboratory

    2009-12-01

    Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R&D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R&D programs. The purpose of the LWRS R&D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R&D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its international engagement

  6. Extraction of Static and Dynamic Reservoir Operation Rules by Genetic Programming

    Directory of Open Access Journals (Sweden)

    Habib Akbari Alashti

    2014-11-01

    Full Text Available Considering the necessity of desirable operation of limited water resources and assuming the significant role of dams in controlling and consuming the surface waters, highlights the advantageous of suitable operation rules for optimal and sustainable operation of dams. This study investigates the hydroelectric supply of a one-reservoir system of Karoon3 using nonlinear programming (NLP, genetic algorithm (GA, genetic programming (GP and fixed length gen GP (FLGGP in real-time operation of dam considering two approaches of static and dynamic operation rules. In static operation rule, only one rule curve is extracted for all months in a year whereas in dynamic operation rule, monthly rule curves (12 rules are extracted for each month of a year. In addition, nonlinear decision rule (NLDR curves are considered, and the total deficiency function as the target (objective function have been used for evaluating the performance of each method and approach. Results show appropriate efficiency of GP and FLGGP methods in extracting operation rules in both approaches. Superiority of these methods to operation methods yielded by GA and NLP is 5%. Moreover, according to the results, it can be remarked that, FLGGP method is an alternative for GP method, whereas the GP method cannot be used due to its limitations. Comparison of two approaches of static and dynamic operation rules demonstrated the superiority of dynamic operation rule to static operation rule (about 10% and therefore this method has more capabilities in real-time operation of the reservoirs systems.

  7. Five years of operating the TRIGA Mainz reactor

    International Nuclear Information System (INIS)

    Benedict, Georg

    1970-01-01

    Considerable obstacles had to be surmounted before TRIGA MAINZ, first TRIGA reactor built in Germany, reached initial criticality in 1965. Subsequent five years' operation did not raise any major problems. The facility has proven quite reliable and particularly well suited for the purposes of the nuclear chemistry research program pursued at Mainz University. Extensive use is made of the pulse mode of operation. As a result, fuel elements are obviously somewhat overstressed, even though most pulses performed are of the 1.50 dollar size. Maximum licensed steady state power of 100 kW till now has met the requirements of most experiments. However, efforts are in progress to improve irradiation conditions by increasing the reactor power to 300 kW. (author)

  8. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  9. Kansas State University: DOE/KEURP Site Operator Program. Year 4, fourth quarterly report, April 1, 1995--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Kansas State University, in support of a DOE and Kansas Electric Utilities Research Program subject contract, continues to test, evaluate, demonstrate, and develop electric vehicle and infrastructure technology. K-State is operating two Soleq EVcort vehicles. During this reporting period both vehicles were brought back to full operational status after warranty service was completed by Soleq. Vehicle failures occurred due to three unrelated battery cable failures in addition to the replacement of one battery. Both vehicles are being operated on a routine basis. K-State, along with York Technical College, has established a relationship with Troy Design and Manufacturing (TDM) Redford, Michigan. K-State has ordered no less than four Ford Ranger electric trucks from TDM. K-State is involved in the steering committee that is monitoring and refining information to direct the design and testing of these new technology vehicles. TDM should become the first automotive manufacturer certified by one of the Big Three under their Quality Vehicle Manufacturer program. Kansas State University and the Kansas Electric Utility Research Program look forward to working with TDM on their new EV program.

  10. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  11. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  12. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  13. The Effects of International Operations on the Relationship Between Manufacturing Improvement Programs and Operational Performance

    DEFF Research Database (Denmark)

    Matyusz, Zsolt; Demeter, Krisztina; Boer, Harry

    The link between manufacturing programs and operational performance, and the effects of company internal and external factors on that relationship, are well studied in the literature, both theoretically and empirically. However, previous studies rarely took into account how the scope of operations...... of the business unit affects the relationship between manufacturing programs and performances. We investigate the scope of operations from the manufacturing perspective (i.e. companies that manufacture in only one country have narrow scope of operations, while companies that manufacture in more than one country...... have broad scope of operations). We apply structural equation modelling (SEM) using PLS path modelling to investigate the effect of scope of operations on the relationship between manufacturing improvement programs and operational performance. Manufacturing improvement programs are programs like...

  14. 42 CFR 51.21 - Contracts for program operations.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contracts for program operations. 51.21 Section 51... APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Program Administration and Priorities § 51.21 Contracts for program operations. (a) An eligible P&A system should work...

  15. Isotope Production and Distribution Program`s Fiscal Year 1997 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-27

    The Department of Energy Isotope Production and Distribution Program mission is to serve the national need for a reliable supply of isotope products and services for medicine, industry and research. The program produces and sells hundreds of stable and radioactive isotopes that are widely utilized by domestic and international customers. Isotopes are produced only where there is no U.S. private sector capability or other production capacity is insufficient to meet U.S. needs. The Department encourages private sector investment in new isotope production ventures and will sell or lease its existing facilities and inventories for commercial purposes. The Isotope Program reports to the Director of the Office of Nuclear Energy, Science and Technology. The Isotope Program operates under a revolving fund established by the Fiscal Year (FY) 1990 Energy and Water Appropriations Act and maintains financial viability by earning revenues from the sale of isotopes and services and through annual appropriations. The FY 1995 Energy and Water Appropriations Act modified predecessor acts to allow prices charged for Isotope Program products and services to be based on production costs, market value, the needs of the research community, and other factors. Although the Isotope Program functions as a business, prices set for small-volume, high-cost isotopes that are needed for research purposes may not achieve full-cost recovery. As a result, isotopes produced by the Isotope Program for research and development are priced to provide a reasonable return to the U.S. Government without discouraging their use. Commercial isotopes are sold on a cost-recovery basis. Because of its pricing structure, when selecting isotopes for production, the Isotope Program must constantly balance current isotope demand, market conditions, and societal benefits with its determination to operate at the lowest possible cost to U.S. taxpayers. Thus, this report provides a financial analysis of this situation.

  16. Implementation challenges of a motor operated valve program

    International Nuclear Information System (INIS)

    Ferguson, T.L.

    1995-01-01

    Electric motor operated valves (MOVs) have become a global focus of attention for Nuclear Power Plant (NPP) operators due to reported operability problems in the last decade. Many NPPs have or are in the process of setting up maintenance programs to address MOV operability issues. Bruce B is in the initial stages of implementing such a program. This paper outlines some of the challenges that have been encountered and how they are being approached to establish an effective program. (author)

  17. Vascular Trauma Operative Experience is Inadequate in General Surgery Programs.

    Science.gov (United States)

    Yan, Huan; Maximus, Steven; Koopmann, Matthew; Keeley, Jessica; Smith, Brian; Virgilio, Christian de; Kim, Dennis Y

    2016-05-01

    Vascular injuries may be challenging, particularly for surgeons who have not received formal vascular surgery fellowship training. Lack of experience and improper technique can result in significant complications. The objective of this study was to examine changes in resident experience with operative vascular trauma over time. A retrospective review was performed using Accreditation Council for Graduate Medical Education (ACGME) case logs of general surgery residents graduating between 2004 and 2014 at 2 academic, university-affiliated institutions associated with level 1 trauma centers. The primary outcome was number of reported vascular trauma operations, stratified by year of graduation and institution. A total of 112 residents graduated in the study period with a median 7 (interquartile range 4.5-13.5) vascular trauma cases per resident. Fasciotomy and exposure and/or repair of peripheral vessels constituted the bulk of the operative volume. Linear regression showed no significant trend in cases with respect to year of graduation (P = 0.266). Residents from program A (n = 53) reported a significantly higher number of vascular trauma cases when compared with program B (n = 59): 12.0 vs. 5.0 cases, respectively (P < 0.001). Level 1 trauma center verification does not guarantee sufficient exposure to vascular trauma. The operative exposure in program B is reflective of the national average of 4.0 cases per resident as reported by the ACGME, and this trend is unlikely to change in the near future. Fellowship training may be critical for surgeons who plan to work in a trauma setting, particularly in areas lacking vascular surgeons. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Monitoring of good practices programs and independence for electricity and natural gas system operators. Report 2012

    International Nuclear Information System (INIS)

    2013-09-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 8. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2012. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2012 and audits carried out by the CRE services in these companies in 2012

  19. Monitoring of good practices programs and independence for electricity and natural gas system operators. 2010 report

    International Nuclear Information System (INIS)

    2011-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 6. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2010. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2010 and audits carried out by the CRE services in these companies in 2010

  20. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond

  1. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

  2. A Volunteer Program for Abnormal Psychology Students: Eighteen Years and Still Going Strong.

    Science.gov (United States)

    Scogin, Forrest; Rickard, Henry C.

    1987-01-01

    A volunteer experience in abnormal psychology is described. The program has been operating for 18 years, and student reactions have been quite positive. The program augments the traditional course offerings and provides reciprocal service for the University of Alabama and mental health facilities. Guidelines for implementing a volunteer program…

  3. 47 CFR 76.1710 - Operator interests in video programming.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operator interests in video programming. 76....1710 Operator interests in video programming. (a) Cable operators are required to maintain records in... interests in all video programming services as well as information regarding their carriage of such...

  4. Application of the RTNDT- and RTT0- concept for the Borssele RPV considering 60 years of operation

    Energy Technology Data Exchange (ETDEWEB)

    Barthelmes, J.; Keim, E.; Hein, H. [AREVA NP Gmbh (Germany); Jong, A. de [EPZ Kerncentrale Borssele (Netherlands)

    2011-07-01

    The nuclear power plant (NPP) Borssele started operation in 1973 and was designed for operation until 2014. In order to operate the plant beyond 2013 an assessment for long term operation (LTO) for 60 years was performed. For experimental validation of the RPV irradiation behavior, two irradiation surveillance programs, each consisting of one unirradiated and two irradiated sets, were implemented. Each set consists of capsules with representative material test specimens from the RPV core belt-line region, the base metal (BM) rings 03 and 04 and the weld metal (WM) W 03. The first surveillance program is already evaluated and was designed to cover safe operation for 40 years. With the test results from the two irradiation sets of the first surveillance program and from irradiation data of similar RPV steels a prediction of the adjusted reference temperatures at end of life (EoL), covering 60 years of operation, was carried out. The corresponding maximum accumulated theoretical fast neutron fluence (E> 1 MeV) at the inner RPV wall was calculated to 3.22 E+19 n/cm{sup 2} and 3.40 E+19 n/cm{sup 2}, considering no mixed oxide fuel (MOX) and anticipated MOX core loading management, respectively. The leading material in terms of irradiation induced aging is the WM with an adjusted reference temperature of 18 C according to the RTNDT concept and of 3 C according to the Master curve concept, respectively. The results have large safety margins to the KTA limit curve according to the German safety standard KTA 3203. The predicted data will be subject of experimental confirmation in a few years by the test data of the two irradiation sets of the second surveillance program. (authors)

  5. Studying Operation Rules of Cascade Reservoirs Based on Multi-Dimensional Dynamics Programming

    Directory of Open Access Journals (Sweden)

    Zhiqiang Jiang

    2017-12-01

    Full Text Available Although many optimization models and methods are applied to the optimization of reservoir operation at present, the optimal operation decision that is made through these models and methods is just a retrospective review. Due to the limitation of hydrological prediction accuracy, it is practical and feasible to obtain the suboptimal or satisfactory solution by the established operation rules in the actual reservoir operation, especially for the mid- and long-term operation. In order to obtain the optimized sample data with global optimality; and make the extracted operation rules more reasonable and reliable, this paper presents the multi-dimensional dynamic programming model of the optimal joint operation of cascade reservoirs and provides the corresponding recursive equation and the specific solving steps. Taking Li Xianjiang cascade reservoirs as a case study, seven uncertain problems in the whole operation period of the cascade reservoirs are summarized after a detailed analysis to the obtained optimal sample data, and two sub-models are put forward to solve these uncertain problems. Finally, by dividing the whole operation period into four characteristic sections, this paper extracts the operation rules of each reservoir for each section respectively. When compared the simulation results of the extracted operation rules with the conventional joint operation method; the result indicates that the power generation of the obtained rules has a certain degree of improvement both in inspection years and typical years (i.e., wet year; normal year and dry year. So, the rationality and effectiveness of the extracted operation rules are verified by the comparative analysis.

  6. Operative Landscape at Canadian Neurosurgery Residency Programs.

    Science.gov (United States)

    Tso, Michael K; Dakson, Ayoub; Ahmed, Syed Uzair; Bigder, Mark; Elliott, Cameron; Guha, Daipayan; Iorio-Morin, Christian; Kameda-Smith, Michelle; Lavergne, Pascal; Makarenko, Serge; Taccone, Michael S; Wang, Bill; Winkler-Schwartz, Alexander; Sankar, Tejas; Christie, Sean D

    2017-07-01

    Background Currently, the literature lacks reliable data regarding operative case volumes at Canadian neurosurgery residency programs. Our objective was to provide a snapshot of the operative landscape in Canadian neurosurgical training using the trainee-led Canadian Neurosurgery Research Collaborative. Anonymized administrative operative data were gathered from each neurosurgery residency program from January 1, 2014, to December 31, 2014. Procedures were broadly classified into cranial, spine, peripheral nerve, and miscellaneous procedures. A number of prespecified subspecialty procedures were recorded. We defined the resident case index as the ratio of the total number of operations to the total number of neurosurgery residents in that program. Resident number included both Canadian medical and international medical graduates, and included residents on the neurosurgery service, off-service, or on leave for research or other personal reasons. Overall, there was an average of 1845 operative cases per neurosurgery residency program. The mean numbers of cranial, spine, peripheral nerve, and miscellaneous procedures were 725, 466, 48, and 193, respectively. The nationwide mean resident case indices for cranial, spine, peripheral nerve, and total procedures were 90, 58, 5, and 196, respectively. There was some variation in the resident case indices for specific subspecialty procedures, with some training programs not performing carotid endarterectomy or endoscopic transsphenoidal procedures. This study presents the breadth of neurosurgical training within Canadian neurosurgery residency programs. These results may help inform the implementation of neurosurgery training as the Royal College of Physicians and Surgeons residency training transitions to a competence-by-design curriculum.

  7. Energy Extension Service Pilot Program: evaluation report after two years. Volume II. State reports

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-04-01

    This report, Vol. II, presents a discussion of the operations of the ten EES pilot state programs during the period from October 1, 1977 through September 30, 1979. Each of the ten pilot states - Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming - received a grant of approximately $1.1 million to develop and implement an 18-month program beginning on October 1, 1977. In September 1978, each State received an additional $370,000 for service-delivery programs for the extension of the pilot program, April 1979 through September 1979. A case-study description of the operations of the pilot program in each State is provided here, with special attention given to the two programs selected in each State for more-detailed study and survey research. Although the thrust of this volume is descriptive, some survey data and analyses are presented for the emphasis programs. Two telephone surveys of clients and a non-client sample were conducted, one at the end of the first year of the pilot program (October 1977 - September 1978) and one at the end of the second year (October 1978 - September 1979).

  8. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  9. Department of Energy Site Operator Program. Final report, October 1, 1991--September 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    York Technical College is a two-year public institution accredited by the Commission of Colleges of the Southern Association of Colleges and Schools. York Technical College has been involved with electric vehicles since the late 1980`s. The four major objectives of the Site Operator Program were (1) field test and evaluate electric and hybrid vehicles and related components; (2) define and develop a national infrastructure system including electric charging systems, service/training education programs, utility system impacts and safety standards; (3) increase public awareness regarding environmental benefits, reduced dependency on foreign oil, technology development, and economic impacts; (4) assist local, state and federal agencies and fleet operators in developing electric and hybrid vehicle programs. The primary thrusts of the electric vehicle program at York Technical College, supporting the objectives of the Site Operator program were: (1) public awareness, (2) public education, (3) EV maintenance curriculum development and maintenance training, (4) field data collection, (5) vehicle modification and upgrade, (6) establish electric vehicle partnerships.

  10. Training nuclear technicians in two-year, post-secondary educational programs

    International Nuclear Information System (INIS)

    Hull, D.M.; Roney, M.W.

    1975-01-01

    An available and economical supply to future manpower requirements for various types of nuclear technicians can be met by developing and/or restructuring two-year, post-secondary programs at local educational institutions. The Technical Education Research Centers program is under contract from the U.S. Office of Education to delineate the job requirements and develop curricula and instructional materials for two-year, post-secondary training of nuclear technicians. Six job categories have been identified along with corresponding tasks which the technician performs. These categories are: Reactor Operator, Nuclear Instrumentation Technician, Nuclear QA/QC Technician, Radiochemistry Technician, Radiation Protection Technician and Nuclear Medicine Technician. For the first five categories curricula have been established, courses have been described, and instructional materials are being written

  11. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Etalle, Sandro; Palamidessi, Catuscia

    1999-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  12. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Bossi, Annalisa; Etalle, Sandro; Palamidessi, Catuscia

    2000-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  13. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  14. The Quest CCS Project - MMV Technology Deployment Through Two Years of Operation

    Science.gov (United States)

    O'Brien, S.

    2017-12-01

    In September 2012, Shell, on behalf of the Athabasca Oil Sands Project venture (Shell Canada Energy, Chevron Canada Limited, Marathon Oil Canada Corporation), announced that it was proceeding to construct the Quest Carbon Capture and Storage (CCS) project near Fort Saskatchewan. Quest is the world's first large-scale commercial application of CCS at an oil sands operation, and it is now capturing more than one million tonnes of CO2 per year from the Scotford Upgrader. It is a fully integrated project, involving CO2 capture at the bitumen upgrader, transportation along a 65 km pipeline, and CO2 storage in a deep saline aquifer (the Basal Cambrian Sands). Construction was completed in August 2015, and the Quest project was certified for commercial operation in September 2015. The Measurement, Monitoring and Verification (MMV) program for Quest is comprehensive, with a variety of technologies being used to monitor the atmosphere, hydrosphere, biosphere and geosphere. These include a Lightsource system for atmospheric monitoring, extensive groundwater sampling, DAS VSPs to assess the development of the CO2 plume, a microseismic array to measure any induced seismic activity, and temperature and pressure gauges for reservoir monitoring. Over two years of operations, this program has been optimized to address key risks while improving operational efficiency. Quest has now successfully captured and stored more than 2 million tonnes of CO2 with no MMV indications of any storage issues.

  15. A reliability program approach to operational safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques is being formulated for potential application in the nuclear power industry. Methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed and a review of current nuclear risk-dominant issues conducted. The need for a reliability approach to address dependent system failures, operating and emergency procedures and human performance, and develop a plant-specific performance data base for safety decision making is demonstrated. Current research has concentrated on developing a Reliability Program approach for the operating phase of a nuclear plant's lifecycle. The approach incorporates performance monitoring and evaluation activities with dedicated tasks that integrate these activities with operation, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the Reliability Program. (orig./HP)

  16. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    International Nuclear Information System (INIS)

    Young, C.L.

    1994-01-01

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items

  17. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    International Nuclear Information System (INIS)

    Bechtel Nevada Ecological Services

    1998-01-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS

  18. Seven years of operation of the U. S. geological survey TRIGA reactor

    International Nuclear Information System (INIS)

    Kraker, Pat

    1976-01-01

    February 1976 marks 7 years of operation of the U. S. Geological Survey TRIGA Reactor (GSTR) facility. In these 7 years we have generated more than 5800 MWH's of thermal energy and irradiated more than 47,000 samples for experimenters from the Survey, universities, and other Governmental agencies. Several mechanical and electrical components have required attention. Changes to the technical specifications have included one minor wording change involving the evacuation alarm, a reevaluation of the measurement of argon-41 concentrations, a revision concerning transient-rod maintenance, and a reduction in the frequency of fuel-element measurements. To improve physical security we have increased building security, installed an intrusion alarm, and, most recently, expanded the boundaries of the facility within the building to provide better control access. There also have been major changes to our operating procedures and the initiation of a reactor-operator requalification program. (author)

  19. Budget estimates: Fiscal year 1994. Volume 3: Research and program management

    Science.gov (United States)

    1994-01-01

    The research and program management (R&PM) appropriation provides the salaries, other personnel and related costs, and travel support for NASA's civil service workforce. This FY 1994 budget funds costs associated with 23,623 full-time equivalent (FTE) work years. Budget estimates are provided for all NASA centers by categories such as space station and new technology investments, space flight programs, space science, life and microgravity sciences, advanced concepts and technology, center management and operations support, launch services, mission to planet earth, tracking and data programs, aeronautical research and technology, and safety, reliability, and quality assurance.

  20. Reactor operations, inspection and maintenance. PNGS Calibration Program

    International Nuclear Information System (INIS)

    Lopez, E.

    1997-01-01

    The PNGS Calibration Program is being implemented as a response to various concerns identified in recent PEER evaluations and AECB audits. Identified areas of concern were the approach to instrument calibration of Special Safety Systems (SSS). The implementation of a calibration program is a significant improvement in operating practices. A systematic and comprehensive approach to calibration of instrumentation will improve the quality of operation of the plant with a positive contribution to PNGS safety of operation and economic objectives. This paper describes the strategy to implement the proposed calibration program and describes its calibration data requirements. (DM)

  1. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  2. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  3. The future of the IPR-R1 TRIGA MARK I reactor after 48 years operation

    International Nuclear Information System (INIS)

    Maretti, Fausto Junior; Sette Camara, Luiz Otavio I.; Oliveira, Paulo Fernando

    2008-01-01

    The TRIGA Mark I IPR-R1 Reactor operates in the Nuclear Technology Development Center/ Brazilian Committion for Nuclear Energy (CDTN/CNEN), originally Institute of Radioactive Researches, in Belo Horizonte, Minas Gerais, since November 6, 1960. Initially it operated for isotope production for different uses, being later used in wide scale for another purposes as analyses for activation with neutrons and training of nuclear power plants operators. Dozens of degree theses were also developed with the use of the reactor. Along the years, several improvements were introduced in the reactor and its auxiliary systems, with the purpose to provide better use of the facilities and with the objective to increase the safety in the operation. The reactor is ready right now to operate at 250 kW, and for sure the nuclear applications programmed will be improved. The Operation Manual and the Safety Analysis report were already modified, as well as the Emergency Plan and the relative procedures to the same. After the tests at the end of 2008, the reactor will already be operating in the new power. This work presents a description of the several accomplishments of the last years and comments about the possibility of new uses for the reactor in the several areas of nuclear applications and some of the experiments and tests results during the upgrading program. (authors)

  4. 2008 report on the Monitoring of good practices programs and independence for electricity and natural gas system operators

    International Nuclear Information System (INIS)

    2009-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 4. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2008. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2008 and audits carried out by the CRE services in these companies in 2008

  5. Integrated initial training program for a CEGB operations engineer

    International Nuclear Information System (INIS)

    Tompsett, P.A.

    1987-01-01

    This paper considers the overall training programs undertaken by a newly appointed Operations Engineer at one of the Central Electricity Generating Board's (CEGB) Advanced Gas Cooled Reactor (AGR) nuclear power stations. The training program is designed to equip him with the skills and knowledge necessary for him to discharge his duties safely and effectively. In order to assist the learning process and achieve and integrated program, aspects of reactor technology and operation, initially the subject of theoretical presentations at the CEGB's Nuclear Power Training Center (NPTC) are reinforced by either simulation and/or practical experience on site. In the later stages plant-specific simulators, operated by trained tutors, are incorporated into the training program to provide the trainee with practical experience of plant operation. The trainee's performance is assessed throughout the program to provide feedback to the trainee, the trainers and station management

  6. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  7. A NEW MUTATION OPERATOR IN GENETIC PROGRAMMING

    Directory of Open Access Journals (Sweden)

    Anuradha Purohit

    2013-01-01

    Full Text Available This paper proposes a new type of mutation operator, FEDS (Fitness, Elitism, Depth, and Size mutation in genetic programming. The concept behind the new mutation operator is inspired from already introduced FEDS crossover operator to handle the problem of code bloating. FEDS mutation operates by using local elitism replacement in combination with depth limit and size of the trees to reduce bloat with a subsequent improvement in the performance of trees (program structures. We have designed a multiclass classifier for some benchmark datasets to test the performance of proposed mutation. The results show that when the initial run uses FEDS crossover and the concluding run uses FEDS mutation, then not only is the final result significantly improved but there is reduction in bloat also.

  8. Operating and Assurance Program Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  9. Canadian fuel development program and recent operational experience

    International Nuclear Information System (INIS)

    Cox, D.S.; Kohn, E.; Lau, J.H.K.; Dicke, G.J.; Macici, N.N.; Sancton, R.W.

    1995-01-01

    This paper provides an overview of the current Canadian CANDU fuel R and D programs and operational experience. The details of operational experience for fuel in Canadian reactors are summarized for the period 1991-1994; excellent fuel performance has been sustained, with steady-state bundle defect rates currently as low as 0.02%. The status of introducing long 37-element bundles, and bundles with rounded bearing pads is reviewed. These minor changes in fuel design have been selectively introduced in response to operational constraints (end-plate cracking and pressure-tube fretting) at Ontario Hydro's Bruce-B and Darlington stations. The R and D programs are generating a more complete understanding of CANDU fuel behaviour, while the CANDU Owners Group (COG) Fuel Technology Program is being re-aligned to a more exclusive focus on the needs of operating stations. Technical highlights and realized benefits from the COG program are summarized. Re-organization of AECL to provide a one-company focus, with an outward looking view to new CANDU markets, has strengthened R and D in advanced fuel cycles. Progress in AECL's key fuel cycle programs is also summarized. (author)

  10. Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational

    International Nuclear Information System (INIS)

    1995-01-01

    This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992

  11. Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

  12. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada Ecological Services

    1998-10-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

  13. Resident operative experience in general surgery, plastic surgery, and urology 5 years after implementation of the ACGME duty hour policy.

    Science.gov (United States)

    Simien, Christopher; Holt, Kathleen D; Richter, Thomas H; Whalen, Thomas V; Coburn, Michael; Havlik, Robert J; Miller, Rebecca S

    2010-08-01

    Resident duty hour restrictions were implemented in 2002-2003. This study examines changes in resident surgical experience since these restrictions were put into place. Operative log data for 3 specialties were examined: general surgery, urology, and plastic surgery. The academic year immediately preceding the duty hour restrictions, 2002-2003, was used as a baseline for comparison to subsequent academic years. Operative log data for graduating residents through 2007-2008 were the primary focus of the analysis. Examination of associated variables that may moderate the relationship between fewer duty hours and surgical volume was also included. Plastic surgery showed no changes in operative volume following duty hour restrictions. Operative volume increased in urology programs. General surgery showed a decrease in volume in some operative categories but an increase in others. Specifically the procedures in vascular, plastic, and thoracic areas showed a consistent decrease. There was no increase in the percentage of programs' graduates falling below minimum requirements. Procedures in pancreas, endocrine, and laparoscopic areas demonstrated an increase in volume. Graduates in larger surgical programs performed fewer procedures than graduates in smaller programs; this was not the case for urology or plastic surgery programs. The reduction of duty hours has not resulted in an across the board decrease in operative volume. Factors other than duty hour reforms may be responsible for some of the observed findings.

  14. Ten-Year Summary and Evaluation of Operations and Performance of the Utica Aquifer and North Lake Basin Wetlands Restoration Project, 2004-2014

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-11-01

    This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first ten years of this initiative (2004-2014). The results of the program for the first five-year period of operation were previously discussed in detail (Argonne 2011). The present report focuses on treatment system operational data and regulatory compliance monitoring results for the site during the second five-year period of operation (2010-2014), together with the results of (1) ongoing monitoring and (2) targeted groundwater sampling for volatile organic compounds (VOCs) analyses conducted at Utica in 2015 (following completion of the tenth year of systems operation), to assess the 10-year progress of the Utica remediation effort.

  15. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  16. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  17. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

  18. Annual report on the Monitoring of good practices programs and independence for electricity and natural gas system operators - 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 2. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2006. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2006 and audits carried out by the CRE services in these companies in 2006

  19. Annual report on the Monitoring of good practices programs and independence for electricity and natural gas system operators - 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 3. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2007. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2007 and audits carried out by the CRE services in these companies in 2007

  20. NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)

    Energy Technology Data Exchange (ETDEWEB)

    Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad; Gehrig, Bruce; Lu, Na

    2012-12-31

    The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department of Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following

  1. Relaxed Operational Semantics of Concurrent Programming Languages

    Directory of Open Access Journals (Sweden)

    Gustavo Petri

    2012-08-01

    Full Text Available We propose a novel, operational framework to formally describe the semantics of concurrent programs running within the context of a relaxed memory model. Our framework features a "temporary store" where the memory operations issued by the threads are recorded, in program order. A memory model then specifies the conditions under which a pending operation from this sequence is allowed to be globally performed, possibly out of order. The memory model also involves a "write grain," accounting for architectures where a thread may read a write that is not yet globally visible. Our formal model is supported by a software simulator, allowing us to run litmus tests in our semantics.

  2. The IPR-R1 TRIGA Mark I Reactor in 39 years: Operations and general improvements

    International Nuclear Information System (INIS)

    Maretti Junior, Fausto; Prado Fernandes, Marcio; Oliveira, Paulo Fernando; Alves de Amorim, Valter

    1999-01-01

    The nuclear IPR-R1 TRIGA Mark I Reactor operating in the Nuclear Technology Development Center, originally Institute for Radioactive Research in Minas Gerais, Brazil, was dedicated in November 11, 1960. Initially operating for the production of radioisotopes for different uses, it started later to be used in large scale for neutron activation analysis and training of operators for nuclear power plants. Many improvements have been made throughout these years to provide a better performance in its operation and safety conditions. A new cooling system to operate until 300 kW, a new control rod mechanism, an aluminum tank for the reactor pool, an optimization in the pneumatic system, a new reactor control console and a general remodeling of the reactor laboratory were some of the improvements added. To prevent and mitigate the ageing effects, the reactor operation personnel is starting a program to minimize future operation problems. This paper describes the improvements made, the results obtained during the past 39 years, and the precautions taken to ensure future safe operation of the reactor to give operators better conditions of safe work. (author)

  3. A 5-year evaluation of a smoking cessation incentive program for chemical employees.

    Science.gov (United States)

    Olsen, G W; Lacy, S E; Sprafka, J M; Arceneaux, T G; Potts, T A; Kravat, B A; Gondek, M R; Bond, G G

    1991-11-01

    This 5-year study of the Dow Chemical Texas Operations 1984-1985 Smoking Cessation Incentive Program (SCIP) evaluated the smoking habits of 1,097 participants and 1,174 nonparticipants. We observed, via questionnaire and saliva cotinine data, that participants were 2.3 times more likely to be long-term (greater than or equal to 5 years) nonusers of tobacco than nonparticipants (10.2% vs 4.4%, P less than or equal to 0.01). However, smoking cessation rates for 3-4 years, 1-2 years, and less than 1 year were similar for participants who remained smokers at the conclusion of SCIP and nonparticipants. Age and the interaction between the management job category and having quit smoking for at least 30 days sometime prior to the worksite program were important predictors of smoking cessation among participants. Thirty-six percent of the participants who were considered exsmokers of 6 months duration at the conclusion of the program in 1985 remained long-term quitters 5 years later. Stress and enjoyment of smoking were the two most important reasons provided by participants for recidivism. The results of this 5-year evaluation demonstrate the heterogeneity of employee participation and success with a worksite smoking cessation program.

  4. A V ampersand V Program for a real time Operator Advisor expert system

    International Nuclear Information System (INIS)

    Hajek, B.K.; Hardy, C.R.; Miller, D.W.; Bhatnagar, R.

    1989-01-01

    This report discusses an Operator Advisor (OA) consisting of four integrated expert systems which has been under development at the Ohio State University since 1985. The OA was initially conceived as two independent systems, one to manage procedures for the operator, and the other to diagnose plant faults and to validate sensor data. The OA has used the Perry Nuclear Power Plant simulator as the reference plant. It has been programmed with knowledge gathered from power plant experts and plant documents. Following incremental programming, the OA has been tested off line by running scenarios on the plant simulator and verifying that the OA responded as predicted by the simulator. Specifications have been developed and periodically published in the literature over the past four years. These are currently being collected and expanded upon as part of a formal Verification and Validation (V ampersand V) Program. The V ampersand V Program is defined by three types of documents: specification documents, a V ampersand V document, and procedures to support implementation of the specifications and V ampersand V programs

  5. A V and V program for a real time operator advisor expert system

    International Nuclear Information System (INIS)

    Hajek, B.K.; Hardy, C.R.; Miller, D.W.; Bhatnagar, R.

    1991-01-01

    This paper reports on an Operator Advisor (OA) consisting of four integrated expert systems under development at The Ohio State University since 1985. The OA was initially conceived as two independent systems, one to manage procedures for the operator, and the other to diagnose plant faults and to validate sensor data. The OA has used the Perry Nuclear Power Plant simulator as the reference plant. It has been programmed with knowledge gathered from power plant experts and plant documents. Following incremental programming, the OA has been tested off line by running scenarios on the plant simulator and verifying that the OA responded as predicted by the simulator. Specifications have been developed and periodically published in the literature over the past four years. These are currently being collected and expanded upon as part of a formal Verification and Validation (V and V) Program. The V and V Program is defined by three types of documents: specification documents, a V and V document, and procedures to support implementation of the specifications and V and V program

  6. Comprehensive care program for elderly patients over 65 years with hip fracture.

    Science.gov (United States)

    Fernández-Moyano, A; Fernández-Ojeda, R; Ruiz-Romero, V; García-Benítez, B; Palmero-Palmero, C; Aparicio-Santos, R

    2014-01-01

    To report the health outcomes of a multidisciplinary care program for patients over 65 years with hip fracture. We have developed a care coordination model for the comprehensive care of hip fracture patients. It establishes what, who, when, how and where orthopedists, internists, family physicians, emergency, intensive care, physiotherapists, anesthetists, nurses and workers social intervene. All elderly patients over 65 years admitted with the diagnosis of hip fracture (years 2006 to 2010) were retrospectively evaluated. One thousand episodes of hip fracture, corresponding to 956 patients, were included. Mean age was 82 years and mean stay 6.7 days. This was reduced by 1.14 days during the 5 years of the program. A total of 85.1% were operated on before 72 yours, and 91.2% during the program. Incidence of surgical site infection was 1.5%. In-hospital mortality was 4.5%, (24.2% at 12 months). Readmissions at one years was 14.9%. Independence for basic activity of daily living was achieved by 40% of the patients. This multidisciplinary care program for hip fracture patients is associated with positive health outcomes, with a high percentage of patients treated early (more than 90%), reduced mean stay (less than 7 days), incidence of surgical site infections, readmissions and inpatient mortality and at one year, as well as adequate functional recovery. Copyright © 2012 Elsevier España, S.L. All rights reserved.

  7. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

    1996-08-01

    Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

  8. Operational budgeting using fuzzy goal programming

    OpenAIRE

    Saeed Mohammadi; Kamran Feizi; Ali Khatami Firouz Abadi

    2013-01-01

    Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate oper...

  9. Year 2000 program

    International Nuclear Information System (INIS)

    Lapp, D.

    1999-01-01

    The steps that Enbridge Consumer Gas Company has taken to prepare for year 2000 were highlighted in a series of overhead viewgraphs which accompanied this presentation. The company's Y2K program was initiated early in 1998 with an initial assessment of the true magnitude of the problem. The transportation and distribution divisions of the company are running separate but coordinated programs. The methodology is to perform an inventory of all components, conduct risk assessments and to determine a compliance strategy to remediate any problems so that all critical systems can be Y2K ready by June, 1999. The second part of this presentation reviewed the company's business continuity planning. This included: (1) an overview of natural gas, (2) BCP methodology, (3) risk assessment, (4) supply chain management, (5) best practices, and (6) program status. 2 figs

  10. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  11. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    International Nuclear Information System (INIS)

    Williams, Don

    2014-01-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation's electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy's (DOE) Office of Nuclear Energy [NE] and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE's Light Water Reactor Sustainability [LWRS] Program and EPRI's Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to @@@establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.@@@ This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  12. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  13. Summary of Program Evaluation Results: 1985-1986 School Year Pre-Kindergarten Educational Program.

    Science.gov (United States)

    Heath, Robert W.; And Others

    Reported are findings of the 1985-86 program evaluation of the prenatal-to-preschool and preschool programs operating under the auspices of the Kamehameha Schools/Bishop Estate. Evaluation of the prenatal-to-preschool program (the Kupulani Program) included item analysis of the Questions about Pregnancy Test, development of a revised data…

  14. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  15. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  16. Optimal Operation of Radial Distribution Systems Using Extended Dynamic Programming

    DEFF Research Database (Denmark)

    Lopez, Juan Camilo; Vergara, Pedro P.; Lyra, Christiano

    2018-01-01

    An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation o...... approach is illustrated using real-scale systems and comparisons with commercial programming solvers. Finally, generalizations to consider other EDS operation problems are also discussed.......An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation...... of the EDS by setting the values of the controllable variables at each time period. A suitable definition for the stages of the problem makes it possible to represent the optimal ac power flow of radial EDS as a dynamic programming problem, wherein the 'curse of dimensionality' is a minor concern, since...

  17. Magnetic Fusion Science Fellowship program: Summary of program activities for calendar year 1986

    International Nuclear Information System (INIS)

    1986-01-01

    This report describes the 1985-1986 progress of the Magnetic Fusion Science Fellowship program (MFSF). The program was established in January of 1985 by the Office of Fusion Energy (OFE) of the US Department of Energy (DOE) to encourage talented undergraduate and first-year graduate students to enter qualified graduate programs in the sciences related to fusion energy development. The program currently has twelve fellows in participating programs. Six new fellows are being appointed during each of the program's next two award cycles. Appointments are for one year and are renewable for two additional years with a three year maximum. The stipend level also continues at a $1000 a month or $12,000 a year. The program pays all tuition and fee expenses for the fellows. Another important aspect of the fellowship program is the practicum. During the practicum fellows receive three month appointments to work at DOE designated fusion science research and development centers. The practicum allows the MFSF fellows to directly participate in on-going DOE research and development programs

  18. Bioenergy Technologies Office Multi-Year Program Plan. March 2016

    Energy Technology Data Exchange (ETDEWEB)

    Schwab, Amy [Bioenergy Technologies Office, Washington, DC (United States)

    2016-03-01

    The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  19. A Two-Year Multidisciplinary Training Program for the Frontline Workforce in Community Treatment of Severe Mental Illness.

    Science.gov (United States)

    Ruud, Torleif; Flage, Karin Blix; Kolbjørnsrud, Ole-Bjørn; Haugen, Gunnar Brox; Sørlie, Tore

    2016-01-01

    Since 1999, a national two-year multidisciplinary onsite training program has been in operation in Norway. The program trains frontline workforce personnel who provide community treatment to people with severe mental illness. A national network of mental health workers, consumers, caregivers, and others providing or supporting psychosocial treatment and rehabilitation for people with severe mental illness has organized local onsite part-time training programs in collaboration with community mental health centers (CMHCs), municipalities, and primary care providers. CMHC and primary care staff are trained together to increase collaboration. Nationwide dissemination has continued, with new local programs established every year. Evaluations have shown that the program is successful.

  20. Electric and Hybrid Vehicle Program: Site Operation Program. Quarterly progress report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.; Bassett, R.R.; Briasco, S. [and others

    1995-12-01

    The Site Operator Program has evolved substantially since its inception in response to the Electric Vehicle Research and Demonstration Act of 1976. In its original form, a commercialization effort was intended but this was not feasible for lack of vehicle suppliers and infrastructure. Nonetheless, with DOE sponsorship and technical participation, a few results (primarily operating experience and data) were forthcoming. The current Program comprises eleven sites and over 200 vehicles, of which about 50 are latest generation vehicles. DOE partially funds the Program participant expenditures and the INEL receives operating and maintenance data for the DOE-owned, and participant-owned or monitored vehicles, as well as Program reports. As noted elsewhere in this report, participants represent several widely differing categories: electric utilities, academic institutions, and federal agencies. While both the utilities and the academic institutions tend to establish beneficial relationships with the industrial community.

  1. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  2. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  3. Limiting conditions for operation relaxation program

    International Nuclear Information System (INIS)

    Merz, J.F.

    1985-01-01

    The purpose of this effort was to assess the impact of system maintenance unavailability on plant risk to provide technical justification for the relaxation of system limiting conditions for operation from three to seven days. The primary goal of the relaxation program is to allow for more thorough equipment maintenance. A potential increase in out-of-service time for a particular outage caused by the performance of more effective repairs will be counterbalanced by a probable decrease in the frequency in the outage rate of a component. Benefits resulting from an increase in allowed outage time include: (a) a potential reduction in total system out-of-service time, (b) a minimization of challenges to plant systems, and (c) a reduction in the number of emergency technical specification change requests. This program therefore offers an opportunity to more effectively manage plant maintenance and operation

  4. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  5. PUSPATI Triga Reactor - First year in operation

    International Nuclear Information System (INIS)

    Nahrul Khair Rashid.

    1983-01-01

    First year operation of RTP reactor was mostly devoted to making in house training, setting up and testing the facilities in preparation for more routine operations. Generally the operations are categorized into 4 main purposes; experiment of research, teaching and training, demonstration, and testing and maintenance. These four purposes are elaborated in detail. Additions and modifications were performed in order to improve the safety of reactor operation. (A.J.)

  6. Independent auto evaluation of an operative radiological protection program

    International Nuclear Information System (INIS)

    Medrano L, M.A.; Rodriguez C, C.C.; Linares R, D.; Zarate M, N.; Zempoalteca B, R.

    2006-01-01

    The program of operative radiological protection of a nuclear power plant consists of multiple procedures and associate tasks that have as purpose the radiological protection of the workers of the power station. It is for this reason that the constant evaluation of the one it programs it is an important tool in the identification of their weaknesses (and strengths), so they can be assisted appropriately. In this work the main elements of the program of independent auto evaluation of the program of operative radiological protection of the Laguna Verde Central that has been developed and implemented by the National Institute of Nuclear Research are described. (Author)

  7. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  8. Assessment of specialized educational programs for licensed nuclear reactor operators

    International Nuclear Information System (INIS)

    Melber, B.D.; Saari, L.M.; White, A.S.; Geisendorfer, C.L.; Huenefeld, J.C.

    1986-02-01

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation among individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs

  9. Evaluating the effectiveness of operator education/training program of Fugen

    International Nuclear Information System (INIS)

    Maeda, Kouichi; Sakruai, Naoto; Nakamura, Shinji

    2003-01-01

    The ATR Fugen determines 'the Operator Education/Training Program' for plant operators to acquire knowledge, technique and skill from the reactor facility, operation and the other nuclear plant technology. This program consists of the On-the-Job Training (OJT), desk education, ETC training, compact simulator FATRAS training, and lectures in external organization. So it provides education/training according to operators' technical level, knowledge, and experience. Fugen is investigating the most suitable training/education based on past training/education experience. (author)

  10. HANARO operation experience in the year 2004

    International Nuclear Information System (INIS)

    Oh, Soo-Youl; Kim, Heonil; Cho, Yeong-Garp; Jun, Byung-Jin

    2006-01-01

    The experiences of the HANARO operation and maintenance in the year 2004 are presented in this article. The operation of HANARO, a 30 MW research reactor operated by the Korea Atomic Energy Research Institute (KAERI), aims at a safe and effective operation to enhance its utilization in various fields of scientific research and industry. Regardless of its importance of the routine operation, this article is devoted to rather unusual matters such as irregular maintenance events and incidents. Since the first criticality in 1995, it has been a long-cherished task to reach the designed power level of 30 MW from the temporarily approved 24 MW. By resolving the concern on the fuel integrity, the designed level could be licensed and, eventually, it was achieved last November. On the other hand, after its 9 years of operation, the mechanical integrity of the heavy water reflector tank was checked. The measurement of the vertical straightness of the tank inner shell indicated its integrity. Meanwhile, the HANARO fuel production facility was completed at the KAERI site, and it will begin to supply centrifugally atomized fuels, instead of conventional comminuted fuels, to HANARO shortly. There were several incidents in 2004, which have all been cleared, including a leak of heavy water, melting of a sample in an irradiation hole for the neutron activation analysis, and a condensation problem in a horizontal beam tube. The progress of and lessons from each incident are presented. The utilization of HANARO is expanding every year and the trend will also continue in 2005. The operation mode has been changed from an 18-day continuous operation and 10-day shutdown (18-10 mode) to the 23-12 mode since the end of 2004, and a further extension is planned to the 30-12 mode. Thanks to this extended operation term, an increased power level and, most importantly, a reliable operation, the HANARO is gaining more and more credit from the end users. (author)

  11. Programming languages and operating systems used in data base systems

    International Nuclear Information System (INIS)

    Radulescu, T.G.

    1977-06-01

    Some apsects of the use of the programming languages and operating systems in the data base systems are presented. There are four chapters in this paper. In the first chapter we present some generalities about the programming languages. In the second one we describe the use of the programming languages in the data base systems. A classification of the programming languages used in data base systems is presented in the third one. An overview of the operating systems is made in the last chapter. (author)

  12. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

    2007-02-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other

  13. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  14. 94-1 R and D program annual operating plan: Fiscal Year 2003

    International Nuclear Information System (INIS)

    Mason, Richard E.; Dominguez, Pamela D.

    2003-01-01

    The Laboratory's 94-1 R and D Program is conducted in response to (1) the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1, 2000-1, and (2) the DNFSB letter to T. J. Glauthier of December 6, 1999, which emphasizes that material stored in a 3013 container must be represented in the Laboratory's Materials Identification and Surveillance (MIS) program. Implementation of the 94-1 R and D Program is the responsibility of the Office of Integration and Disposition. Our program focuses on accelerating the Department of Energy's (DOE's) efforts to reduce health and safety risks to workers, the public, and the environment. Coordinating with the Albuquerque Nuclear Materials Stewardship Office, the Office of Integration of Deposition continues to direct activities under this project that involve the development of stabilization technologies. This program also maintains the viability of the 3013 standard, Section 6, which requires that materials are represented in the MIS inventory. The 94-1 R and D Program focuses on developing the technical basis for stabilizing and safely storing plutonium-bearing materials. To address these issues, we have in place a material identification and stabilization project, a surveillance and monitoring project, and a management team

  15. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  16. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  17. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  18. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  19. SPEAR 3: the First Year of Operation

    International Nuclear Information System (INIS)

    Hettel, R.O.

    2006-01-01

    The first electrons were accumulated in the newly completed 3-GeV SPEAR 3 storage ring on December 15, 2003, five days after the beginning of commissioning. By mid-January of 2004, 100 mA were stored, the maximum current allowed in the first phase of SPEAR 3 operation, and ring characterization and tuning continued until early March when the first photon beam line was opened for users. After the first year of operation the SPEAR 3 beam properties and ring performance had been extensively measured. These include micron stability using slow orbit feedback, an emittance coupling of ∼0.1% and 50-h lifetimes. The performance of SPEAR 3 during its first year of commissioning and operation and the improvement plans are described

  20. Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3

    International Nuclear Information System (INIS)

    Loika, E.F.

    1994-01-01

    This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate

  1. Monitoring of good practices programs and independence for electricity and natural gas system operators. Summary report 2011

    International Nuclear Information System (INIS)

    2012-07-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 7. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2011. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2011 and audits carried out by the CRE services in these companies in 2011. These elements were supplemented and clarified by many exchanges with the operators, in particular during the committee hearings that took place in spring 2012 with each network operator. This report is structured around four cross-cutting themes, supplemented by individual analyses of each operator's situation. The cross-cutting issues address communication and user's awareness of the network operators, the new compliance officer function, TSO certification and, finally, the results of the 'mystery shopper' telephone survey carried out by the CRE. The individual situations analysed were those of the eight DSOs serving over 100,000 customers (ERDF, ES, URM, SRD and Geredis-Deux-Sevres for electricity, GrDF, Regaz-Bordeaux and Reseau GDS for natural gas) and the three TSOs (RTE for electricity and GRTgaz and TIGF for natural gas)

  2. An evaluation of vocational high schools in Indonesia: A comparison between four-year and three-year programs

    Directory of Open Access Journals (Sweden)

    Soenarto Soenarto

    2017-12-01

    Full Text Available The research aimed to gain insights into the quality of four-year program vocational high school (VHS in Indonesia compared to four-year program VHS. This research was conducted based on the school graduate standard, business sector and industrial sector (or Dunia Usaha dan Dunia Industri (DUDI – or the performance of the graduates and alumni (the graduates’ satisfaction. The research was conducted using Discrepancy Evaluation Model using 16 VHSs (eight four-year program VHSs and eight three-year program VHSs. The result shows that from the standpoint of the school, the graduates of the four-year program VHS are higher in quality than those of the three-year program VHS. The four-year program VHS graduates are more qualified in seven aspects: teamwork, discipline, tenacity, theoretical knowledge, confidence, creativity, and leadership. Meanwhile, using DUDI standpoint, the four-year program VHS graduates are also higher in quality than the three-year program VHS graduates. In addition, the four-year program VHS graduates are better in the quality of their discipline, tenacity, theoretical knowledge, practical skills, confidence, carefulness, creativity, and leadership. The four-year program VHS graduates have a higher level of satisfaction in terms of income than the three-year program VHS graduates. The higher quality of the four-year program VHS graduates has resulted from longer duration of the internship program (PKL that provides them with reliable experience and skills concerning work-related problem-solving activities.

  3. 26 CFR 601.803 - Program operations and requirements.

    Science.gov (United States)

    2010-04-01

    ... REVENUE PRACTICE STATEMENT OF PROCEDURAL RULES Tax Counseling for the Elderly § 601.803 Program operations... understanding of Federal tax subjects on which they will provide tax return assistance. Volunteers who do not... individuals involved in the program, to respect the confidentiality of income and financial information known...

  4. Fusion Safety Program annual report, Fiscal Year 1993

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Cadwallader, L.C.; Dolan, T.J.; Herring, J.S.; McCarthy, K.A.; Merrill, B.J.; Motloch, C.G.; Petti, D.A.

    1993-12-01

    This report summarizes the major activities of the Fusion Safety Program in Fiscal Year 1993. The Idaho National Engineering Laboratory (INEL) has been designated by DOE as the lead laboratory for fusion safety, and EG ampersand G Idaho, Inc., is the prime contractor for INEL operations. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations, including universities and private companies. Technical areas covered in the report include tritium safety, beryllium safety, activation product release, reactions involving potential plasma-facing materials, safety of fusion magnet systems, plasma disruptions and edge physics modeling, risk assessment failure rates, computer codes for reactor transient analysis, and regulatory support. These areas include work completed in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed at the INEL for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor projects at the Princeton Plasma Physics Laboratory and a summary of the technical support for the ARIES/PULSAR commercial reactor design studies

  5. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  6. Consumer-Operated Service Programs: monetary and donated costs and cost-effectiveness.

    Science.gov (United States)

    Yates, Brian T; Mannix, Danyelle; Freed, Michael C; Campbell, Jean; Johnsen, Matthew; Jones, Kristine; Blyler, Crystal R

    2011-01-01

    Examine cost differences between Consumer Operated Service Programs (COSPs) as possibly determined by a) size of program, b) use of volunteers and other donated resources, c) cost-of-living differences between program locales, d) COSP model applied, and e) delivery system used to implement the COSP model. As part of a larger evaluation of COSP, data on operating costs, enrollments, and mobilization of donated resources were collected for eight programs representing three COSP models (drop-in centers, mutual support, and education/advocacy training). Because the 8 programs were operated in geographically diverse areas of the US, costs were examined with and without adjustment for differences in local cost of living. Because some COSPs use volunteers and other donated resources, costs were measured with and without these resources being monetized. Scale of operation also was considered as a mediating variable for differences in program costs. Cost per visit, cost per consumer per quarter, and total program cost were calculated separately for funds spent and for resources donated for each COSP. Differences between COSPs in cost per consumer and cost per visit seem better explained by economies of scale and delivery system used than by cost-of-living differences between program locations or COSP model. Given others' findings that different COSP models produce little variation in service effectiveness, minimize service costs by maximizing scale of operation while using a delivery system that allows staff and facilities resources to be increased or decreased quickly to match number of consumers seeking services.

  7. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  8. Defense waste processing facility radioactive operations. Part 1 - operating experience

    International Nuclear Information System (INIS)

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation's first and the world's largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge trademark level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs

  9. File Managing and Program Execution in Web Operating Systems

    OpenAIRE

    Bravetti, Mario

    2010-01-01

    Web Operating Systems can be seen as an extension of traditional Operating Systems where the addresses used to manage files and execute programs (via the basic load/execution mechanism) are extended from local filesystem path-names to URLs. A first consequence is that, similarly as in traditional web technologies, executing a program at a given URL, can be done in two modalities: either the execution is performed client-side at the invoking machine (and relative URL addressing in the executed...

  10. Operating program for an automatic alpha-beta counting system-FAG

    Energy Technology Data Exchange (ETDEWEB)

    German, U; Levinson, L; Shemesh, Y; Peled, O; Weistein, M [Israel Atomic Energy Commission, Beersheba (Israel). Nuclear Research Center-Negev

    1996-12-01

    An alpha and beta counting system - FAG, for planchette samples is operated at the Health Physics department`s laboratory of the NRCN. The system consists of a proportional detector of 8`` diameter operated in coincidence with a guard detector, an automatic sample changer (FAG-FHT770E) and electronics (FAG- FHT1100 digital counter and controller). The original operation mode of the system was based on manual tasks handled by the FHT1100 electronics. Pin option for a basic computer keyboard operation was available too. A computer with appropriate 110 card was connected to the system and a new operating program was developed which enables full automatic control of the various components. The program includes activity calculations and statistical checks as well as data management. The program which was developed enables computer control of all components of the system, based on bi-directional communication. The computer software controls the FHT1100 electronics using the R5232 protocol and the sample changer by an additional 110 card Contec Inodel PIO-48W(PC). The computer controls the whole operation of the system: change of samples, high voltage change, start, stop etc. It handles in the appropriate order the different commands and operates the electronic and mechanic components accordingly (authors).

  11. Operating program for an automatic alpha-beta counting system-FAG

    International Nuclear Information System (INIS)

    German, U.; Levinson, L.; Shemesh, Y.; Peled, O.; Weistein, M.

    1996-01-01

    An alpha and beta counting system - FAG, for planchette samples is operated at the Health Physics department's laboratory of the NRCN. The system consists of a proportional detector of 8'' diameter operated in coincidence with a guard detector, an automatic sample changer (FAG-FHT770E) and electronics (FAG- FHT1100 digital counter and controller). The original operation mode of the system was based on manual tasks handled by the FHT1100 electronics. Pin option for a basic computer keyboard operation was available too. A computer with appropriate 110 card was connected to the system and a new operating program was developed which enables full automatic control of the various components. The program includes activity calculations and statistical checks as well as data management. The program which was developed enables computer control of all components of the system, based on bi-directional communication. The computer software controls the FHT1100 electronics using the R5232 protocol and the sample changer by an additional 110 card Contec Inodel PIO-48W(PC). The computer controls the whole operation of the system: change of samples, high voltage change, start, stop etc. It handles in the appropriate order the different commands and operates the electronic and mechanic components accordingly (authors)

  12. Computerised programming of the Dragon reactor fuel handling operations

    International Nuclear Information System (INIS)

    Butcher, P.

    1976-11-01

    Two suites of FORTRAN IV computer programs have been written to produce check lists for the operation of the two remote control fuel handling machines of the Dragon Reactor. This document describes the advantages of these programs over the previous manual system of writing check lists, and provides a detailed guide to the programs themselves. (author)

  13. The Role Of Quality Assurance Program For Safety Operation Of Nuclear Installations

    International Nuclear Information System (INIS)

    Harjanto, N.T.; Purwadi, K.P.; Boru, D.S.; Farida; Suharni

    2000-01-01

    Nuclear installations expose potential hazard of radiation, therefore in their construction, operation and maintenance, it is necessary to consider safety aspect, in which the safety requirements which has been determined must be met. One of the requirements that is absolutely needed is quality assurance, which covers arrangement of quality assurance program, organization and administration of the implementation of quality assurance, and supervision. Quality Assurance program is a guideline containing quality policies and basic determination on the realization of activities that effect the quality of equipment's and items used in the operation of nuclear installations in order that the operation of nuclear installation can run safety and in accordance with their design aims and operation limits. Quality Assurance Program includes document control, design control, supply control, control of equipment s and items, operation/process control, inspection and control of equipment test, and control of nonconformance and corrections. General system of nuclear installation operation is equipped with safety and supporting systems. These systems must apply the quality assurance program that cover control of activities in the systems. In the implementation of the quality assurance program, it is necessary to establish procedures, work guidelines/instructions, and quality recording that constitutes documents of quality system 2 nd , 3 th , and 4 th level after the quality assurance program. To ensure the effectivity and to prove whether the realization of the program has been pursuant to the determined requirements, an internal audit must be conducted accordingly

  14. Operational budgeting using fuzzy goal programming

    Directory of Open Access Journals (Sweden)

    Saeed Mohammadi

    2013-10-01

    Full Text Available Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate operational budget. The proposed model uses fuzzy triangular as well as interval number to estimate budgeting expenses. The proposed study of this paper is implemented for a real-world case study in province of Qom, Iran and the results are analyzed.

  15. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  16. Summary Report, Southwest Regional Geothermal Operations Research Program: First project year, June 1977-August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Richard T.; Davidson, Ray

    1978-12-01

    The overall objectives of the first year project were as follows: (1) to develop realistic but aggressive scenarios with certainty factors for the development of each identified geothermal resource area in Arizona, Colorado, Nevada, New Mexico, and Utah; (2) to delineate the public actions, together with their schedules, required for the scenarios to materialize; and (3) to develop a computer-based data storage and retrieval system (i.e. a Regional Program Progress Monitor) of the level of a preliminary working model, which is capable of displaying program approach but is not loaded with all available data. In addition, each sponsor had supplementary objectives aligned to its own programmatic goals. DOE sought to develop expertise and programs within the appropriate state agencies upon which future DOE development and commercialization activities could be structured. FCRC sought to promote the utilization of geothermal energy throughout the five-state region for purposes of expanded economic development, increased employment, and higher citizen incomes. The goals of the five states varied from state to state, but generally included the following: development of alternative energy sources to replace dwindling supplies of oil and natural gas; economic and industrial development in rural areas; encouragement of industry and utility development of geothermal energy for electrical power generation; demonstration of the practical applications of energy research and development; and close interaction with business and industry for the commercialization of both electric and direct thermal applications.

  17. [Comprehensive care program for the mentally ill in Spanish prisons (PAIEM): assessment after four years operation].

    Science.gov (United States)

    Sanz, J; Gómez-Pintado, P; Ruiz, A; Pozuelo, F; Arroyo, J M

    2014-01-01

    To assess the comprehensive care program for the mentally ill in prison (PAIEM), which has been implemented for 3 years in Spanish prisons with the aim of improving processes and results. Descriptive study of the data gathered from an anonymous questionnaire completed by members of the PAIEM team in prisons. Frequency distributions were obtained of all the variables relating to facts, attitudes, opinions, experiences, situations and processes of the PAIEM. 91.2% of the PAIEM teams responded. Psychologists, educators, doctors and social workers were the professionals that collaborated most actively in the PAIEM (73%-84%) and were the ones to act most frequently as tutors. The mentally ill are usually located in ordinary modules (80%). The most commonly used activities for their psycho-social rehabilitation are self care (73%), education for health, preparation for daily life and social skills (more than 60%). Interventions with families are basically by telephone (79%). Bivariate analysis showed that the PAIEMs that operate most effectively are those that coordinate well with other technical teams, that prepare referral more than six months prior to release and ones where the NGOs process the referrals. Over 71% of the professionals observed improvements of disabilities and needs in over half the patients more than half of the professionals involved are satisfied (3.4/5) with their participation, although they acknowledge that there is a greater work load. The activities of the PAIEM are adequate, especially in the phases of early detection, stabilisation and rehabilitation and less so in the social incorporation phase, which improves when the third sector intervenes in referrals of patients to the social health care network outside prison.

  18. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    International Nuclear Information System (INIS)

    Cohen, Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-01-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O ampersand M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O ampersand M Improvement Program. O ampersand M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O ampersand M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O ampersand M costs was achieved. Based on the lessons learned, an optimum solar- field O ampersand M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O ampersand M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts

  19. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  20. ENDF/B-V utility programs: description and operating instructions

    International Nuclear Information System (INIS)

    McLaughlin, K.

    1984-03-01

    A description and operating instructions are supplied for the following ENDF/B-V Processing Programs: CHECKER, CRECT, STNDRD, FIZCON, PSYCHE, RESEND, INTER, INTEND, SUMRIZ, PLOTEF, LSTFCV, RIGEL. These programs can be obtained on magnetic tape, free of charge, from the IAEA Nuclear Data Section. (author)

  1. GE-Hitachi ABWR Design for 60 Years of Operation

    International Nuclear Information System (INIS)

    Hoang Xuan Hoa

    2011-01-01

    The GE Hitachi ABWR design benefits from the experiences of the prior generation BWRs in operation since the 1970s, and the knowledge learned from years of technical research on the aging effects on reactor systems, structures and components. The impact of exposure to neutrons over time to the reactor pressure vessel and internal components was evaluated to confirm their structural integrity. Other time-based plant analyses, such as fatigue vibration and corrosion effect, have also been performed on the ABWR to support a 60-year plant life assumption. Finally, operating experience and aging lessons learned have been used to verify the maintenance plans for plant aging management are acceptable to support operation up to 60 years. (author)

  2. Computing single step operators of logic programming in radial basis function neural networks

    Science.gov (United States)

    Hamadneh, Nawaf; Sathasivam, Saratha; Choon, Ong Hong

    2014-07-01

    Logic programming is the process that leads from an original formulation of a computing problem to executable programs. A normal logic program consists of a finite set of clauses. A valuation I of logic programming is a mapping from ground atoms to false or true. The single step operator of any logic programming is defined as a function (Tp:I→I). Logic programming is well-suited to building the artificial intelligence systems. In this study, we established a new technique to compute the single step operators of logic programming in the radial basis function neural networks. To do that, we proposed a new technique to generate the training data sets of single step operators. The training data sets are used to build the neural networks. We used the recurrent radial basis function neural networks to get to the steady state (the fixed point of the operators). To improve the performance of the neural networks, we used the particle swarm optimization algorithm to train the networks.

  3. Computing single step operators of logic programming in radial basis function neural networks

    Energy Technology Data Exchange (ETDEWEB)

    Hamadneh, Nawaf; Sathasivam, Saratha; Choon, Ong Hong [School of Mathematical Sciences, Universiti Sains Malaysia, 11800 USM, Penang (Malaysia)

    2014-07-10

    Logic programming is the process that leads from an original formulation of a computing problem to executable programs. A normal logic program consists of a finite set of clauses. A valuation I of logic programming is a mapping from ground atoms to false or true. The single step operator of any logic programming is defined as a function (T{sub p}:I→I). Logic programming is well-suited to building the artificial intelligence systems. In this study, we established a new technique to compute the single step operators of logic programming in the radial basis function neural networks. To do that, we proposed a new technique to generate the training data sets of single step operators. The training data sets are used to build the neural networks. We used the recurrent radial basis function neural networks to get to the steady state (the fixed point of the operators). To improve the performance of the neural networks, we used the particle swarm optimization algorithm to train the networks.

  4. Computing single step operators of logic programming in radial basis function neural networks

    International Nuclear Information System (INIS)

    Hamadneh, Nawaf; Sathasivam, Saratha; Choon, Ong Hong

    2014-01-01

    Logic programming is the process that leads from an original formulation of a computing problem to executable programs. A normal logic program consists of a finite set of clauses. A valuation I of logic programming is a mapping from ground atoms to false or true. The single step operator of any logic programming is defined as a function (T p :I→I). Logic programming is well-suited to building the artificial intelligence systems. In this study, we established a new technique to compute the single step operators of logic programming in the radial basis function neural networks. To do that, we proposed a new technique to generate the training data sets of single step operators. The training data sets are used to build the neural networks. We used the recurrent radial basis function neural networks to get to the steady state (the fixed point of the operators). To improve the performance of the neural networks, we used the particle swarm optimization algorithm to train the networks

  5. 32 CFR 2004.20 - National Industrial Security Program Operating Manual (NISPOM) [201(a)].

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false National Industrial Security Program Operating... Defense INFORMATION SECURITY OVERSIGHT OFFICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NATIONAL INDUSTRIAL SECURITY PROGRAM DIRECTIVE NO. 1 Operations § 2004.20 National Industrial Security Program...

  6. Clinton P. Anderson Meson Physics Facility and its operational safety program

    International Nuclear Information System (INIS)

    Putnam, T.M.

    1975-01-01

    The Clinton P. Anderson Meson Physics Facility (LAMPF) at the Los Alamos Scientific Laboratory consists of/ (1) a medium-energy, high-intensity linear proton accelerator; (2) experimental areas designed to support a multidisciplined program of research and practical applications; and (3) support facilities for accelerator operations and the experimental program. The high-intensity primary and secondary beams at LAMPF and the varied research program create many interesting and challenging problems for the Health Physics staff. A brief overview of LAMPF is presented, and the Operational Safety Program is discussed, with emphasis on the radiological safety and health physics aspects

  7. Calendar Year 2009 Program Benefits for ENERGY STAR Labeled Products

    Energy Technology Data Exchange (ETDEWEB)

    Homan, Gregory K; Sanchez, Marla C.; Brown, Richard E.

    2010-11-15

    ENERGY STAR is a voluntary energy efficiency labeling program operated jointly by the Environmental Protection Agency (US EPA) and the U.S. Department of Energy (US DOE), designed to identify and promote energy-efficient products, buildings and practices. Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products, and currently labels more than thirty products, spanning office equipment, heating, cooling and ventilation equipment, commercial and residential lighting, home electronics, and major appliances. ENERGY STAR's central role in the development of regional, national and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with stakeholders. This report presents savings estimates from the use ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2009, annual forecasts for 2010 and 2011, and cumulative savings estimates for the period 1993 through 2009 and cumulative forecasts for the period 2010 through 2015. Through 2009 the program saved 9.5 Quads of primary energy and avoided the equivalent of 170 million metric tons carbon (MMTC). The forecast for the period 2009-2015 is 11.5 Quads or primary energy saved and 202 MMTC emissions avoided. The sensitivity analysis bounds the best estimate of carbon avoided between 110 MMTC and 231 MMTC (1993 to 2009) and between 130 MMTC and 285 MMTC (2010 to 2015).

  8. Program-execution in the computer operating-system VORTEX-I

    International Nuclear Information System (INIS)

    Borrmann, H.

    1976-06-01

    Comprehensive German introduction to the structure and operation of a relatively comfortable realtime operating system for process control by VORTEX-I for the V73 of the VARIAN-Company. This is a disc oriented single user system with parallel foreground and background operation. The complete organization of the system-nucleus is described (for input/output exists a separate external report). To the more experienced user of the V73 the existing facilities of interacting with the operating system (operator commands, interrupts and program calls) are exactly described regarding to their internal working. (orig./WB) [de

  9. Federal Geothermal Research Program Update Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently

  10. Federal Geothermal Research Program Update - Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Laney

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or

  11. Sixteen Years of International Co-operation. The OECD/NEA Co-operative Programme on Decommissioning

    International Nuclear Information System (INIS)

    Menon, S.; Valencia, L.

    2002-01-01

    The Co-operative Programme on Decommissioning under the administration of the Radioactive Waste Management Committee of the OECD Nuclear Energy Agency (NEA) has recently completed sixteen years of operation. The Programme, which is essentially an information exchange programme between decommissioning projects, came into being in 1985. It has grown from an initial 10 decommissioning projects from 7 countries to 39 projects from 14 countries today. From purely information exchange to start with, the Programme has, in later years, been functioning as a voice for the collective expression of views of the implementers of nuclear decommissioning. During the first sixteen years of the operation of the Co-operative Programme, nuclear decommissioning has grown from local specialist activities within projects to a competitive commercial industry. By the dismantling and release from regulatory control of over a dozen diverse nuclear facilities, the Programme has been able to demonstrate in practice, that nuclear decommissioning can be performed safely both for the workers and the public, and that this can be done at reasonable costs in an environmentally friendly fashion. During the recent years, discussions and work within the Co-operative Programme, specially within some of the Task Groups, have had/are having effects and repercussions not just in the field of nuclear decommissioning, but can possibly affect activities and regulations in other industries. This paper describes how the Programme and its activities and procedures have evolved over the years and indicate the directions of developments in the organization and execution of decommissioning projects. Finally, it gives a brief overview of the achievements of the Cooperative Programme and visualizes future developments in the field of nuclear decommissioning

  12. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  13. NTC operator training program viewed from SAT-based training process

    International Nuclear Information System (INIS)

    Matsumoto, Yoshio

    1996-01-01

    The Nuclear Power Training Center Ltd. (NTC) was established in June 1972 to train PWR plant operators. Operator training was started in Apr. 1974. Presently we have three full-scope, control-room simulators. Recently IAEA recommended that its Systematic Approach to Training (SAT) be used for the training of NPP personnel. We thoroughly examined the SAT-based process and compared it against the NTC training program. As a result, we have recognized that the NTC training program satisfies the SAT-based training process. We now intend to improve the feedback step of the NTC training system. Our efforts continue to produce a relevant program at the forefront of our profession. (author)

  14. 75 FR 48329 - Tribal Drinking Water Operator Certification Program

    Science.gov (United States)

    2010-08-10

    ... operator has the skills, knowledge, education and experience necessary to deliver safe water supporting... demonstrates the operator has the skills, knowledge, education and experience necessary to deliver safe water... this program can be found at http://www.epa.gov/safewater/tribal.html . 2. Hard Copies. Hard copies of...

  15. Program MASTERCALC: an interactive computer program for radioanalytical computations. Description and operating instructions

    International Nuclear Information System (INIS)

    Goode, W.

    1980-10-01

    MASTERCALC is a computer program written to support radioanalytical computations in the Los Alamos Scientific Laboratory (LASL) Environmental Surveillance Group. Included in the program are routines for gross alpha and beta, 3 H, gross gamma, 90 Sr and alpha spectroscopic determinations. A description of MASTERCALC is presented and its source listing is included. Operating instructions and example computing sessions are given for each type of analysis

  16. Three years operational experience with biodiesel

    International Nuclear Information System (INIS)

    Murphy, J.

    2008-01-01

    TSI Terminal Systems Inc. is the largest container terminal operator in Canada, and has an annual payroll exceeding $150 million. The company started a biodiesel test program with the Canadian Bioenergy Corporation in order to assess the emission reduction impacts of using biodiesel. The pilot was tested with 6 different pieces of equipment used at the terminal over an initial period of 3 weeks. Emissions testing was then conducted for different biodiesel blend levels and compared with baseline data in relation to particulate matter, total hydrocarbons, carbon monoxide (CO), carbon dioxide (CO 2 ), and nitrous oxides (NO x ). Results of the tests confirmed that the biodiesel blends significantly reduced emissions at the terminal and confirmed the operability of biodiesel. Overall emissions were reduced by 30 per cent. The fuel is now being used in all the company's equipment. The use of the biodiesel has not resulted in any engine failures or power losses. tabs., figs

  17. Community-monitoring program surrounding the Nevada Test Site: one year of experience

    International Nuclear Information System (INIS)

    Douglas, G.S.

    1983-05-01

    Since 1954, the US Public Health Service and later the US Environmental Protection Agency Laboratory in Las Vegas, Nevada, have been responsible for conducting a program of environmental radiation monitoring and public radiation safety associated with nuclear weapons tests conducted by the United States. A recent major innovation in this long-term program has been the establishment of a network of Community Monitoring Stations in 15 offsite communities. The new network supplements existing networks operated for nearly three decades in these and other offsite communities. It differs from other networks in the continuing offsite radiation monitoring and public safety program in that it incorporates Federal, State, and local Government participation. This report reviews the history of offsite radiation surveillance leading to institution of the new network and describes the first year of experience with its equipment, methodology, and management as well as its impact on citizens of the communities involved

  18. From US NAVY Mate to Division Leader for Operations - Requirements, Development and Career Paths of LANL/LANSCE Accelerator Operators

    International Nuclear Information System (INIS)

    Spickermann, Thomas

    2012-01-01

    There are opportunities for advancement within the team. Operators advance by: (1) Becoming fully qualified - following the LANSCE Accelerator Operator Training Manual, Operator trainees go through 5 levels of qualification, from Radiation Security System to Experimental Area Operator. Must obtain Knowledge and Performance checkouts by an OSS or AOSS, and an End-of-Card checkout by the team leader or RSS engineer (level I). Program was inspired by US NAVY qualification program for nuclear reactor operators. Time to complete: 2-2.5 years. (2) Fully qualified operators are eligible to apply for vacant (OSS)/AOSS positions; and (3) Alternatively, experienced operators can sign up for the voluntary Senior Operator Qualification Program. They must demonstrate in-depth knowledge of all areas of the accelerator complex. Time to complete is 2-3 years (Minimum 4 years from fully qualified). Eligible for promotion to level between qualified operator and AOSS.

  19. ONE HUNDRED YEARS OF MILES’ OPERATION- WHAT HAS CHANGED?

    Directory of Open Access Journals (Sweden)

    Vanja Pecić

    2008-12-01

    Full Text Available Lisfranc was probably the first to excise the rectum for cancer. He performed operation using perineal approach in 1826. This operation came into common use fifty years later. Czerny did the first combined abdominoperineal resection in attempt to finish excision he could not complete from below. Some fifteen years later Ernest Miles described the planned, one stage abdominoperineal resection.Miles name has become a synonym for this combined procedure, creating a radical change in the philosophy of resection and en bloc lymphadenectomy.In the beginning of twenty-century abdominoperineal resection became golden standard in the treatment of rectal cancer. Reconstructive operations, introduction of stapling devices and better understanding of potential tumor spread, reduced indications for Miles operation.Surgical treatment of rectal cancer made progress in the past 100 years. Miles was the first in line. Without his theory of perirectal lymphatic spread recurrence rate would be still as high as 95%.

  20. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  1. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  2. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  3. Assurance program for remedial action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1985-10-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II language, which is designed to operate using the commercially available dBASE II database software. The paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  4. Assurance Program for Remedial Action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1986-01-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II/sup (b)/ language, which is designed to operate using the commercially available dBASE II database software. This paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  5. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  6. Basic surgical training in Ireland: the impact of operative experience, training program allocation and mentorship on trainee satisfaction.

    LENUS (Irish Health Repository)

    O'Sullivan, K E

    2013-12-01

    Application to the Irish basic surgical training (BST) program in Ireland has decreased progressively over the past 5 years. We hypothesised that this decline was secondary to dissatisfaction with training correlated with reduced operative experience and lack of mentorship among BSTs.

  7. Seismic qualification program plan for continued operation at DOE-SRS nuclear material processing facilities

    International Nuclear Information System (INIS)

    Talukdar, B.K.; Kennedy, W.N.

    1991-01-01

    The Savannah River Facilities for the most part were constructed and maintained to standards that were developed by Du Pont and are not rigorously in compliance with the current General Design Criteria (GDC); DOE Order 6430.IA requirements. In addition, many of the facilities were built more than 30 years ago, well before DOE standards for design were issued. The Westinghouse Savannah River Company (WSRC) his developed a program to address the evaluation of the Nuclear Material Processing (NMP) facilities to GDC requirements. The program includes a facility base-line review, assessment of areas that are not in compliance with the GDC requirements, planned corrective actions or exemptions to address the requirements, and a safety assessment. The authors from their direct involvement with the Program, describe the program plan for seismic qualification including other natural phenomena hazards,for existing NMP facility structures to continue operation Professionals involved in similar effort at other DOE facilities may find the program useful

  8. Computer programs in BASIC language for atomic absorption flame spectroscopy. Part 1. Operating instructions

    International Nuclear Information System (INIS)

    Boyle, W.G. Jr.

    1977-01-01

    These instructions describe how to use three BASIC language programs to process data from atomic absorption spectrophotometers operated in the flame mode. These programs will also control an automatic sampler if desired. The instructions cover loading the programs, responding to computer prompts, choosing among various options for processing the data, operating the automatic sampler, and producing reports. How the programs differ is also explained. Examples of computer/operator dialogue are presented for typical cases

  9. 175 Years of Linear Programming

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 10. 175 Years of Linear Programming - Max Flow = Min Cut. Vijay Chandru M R Rao. Series Article Volume 4 Issue 10 October 1999 pp 22-39. Fulltext. Click here to view fulltext PDF. Permanent link:

  10. 175 Years of Linear Programming

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 5. 175 Years of Linear Programming - Pune's Gift. Vijay Chandru M R Rao. Series Article Volume 4 Issue 5 May ... Computer Science and Automation, IISc Bangalore 560012, India. Director, Indian Institute of Management, Bannerghatta Road, ...

  11. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.; Thurygill, E.W.

    1980-05-01

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  12. Career path for operations personnel

    International Nuclear Information System (INIS)

    Asher, J.A.

    1985-01-01

    This paper explains how selected personnel can now obtain a Bachelor of Science degree in Physics with a Nuclear Power Operations option. The program went into effect the Fall of 1984. Another program was worked out in 1982 whereby students attending the Nuclear Operators Training Program could obtain an Associates of Science degree in Mechanical Engineering Technology at the end of two years of study. This paper presents tables and charts which describe these programs and outline the career path for operators

  13. Operating experience and corrective action program at Ontario Hydro Nuclear

    International Nuclear Information System (INIS)

    Collingwood, Barry; Turner, David

    1998-01-01

    This is a slide-based talk given at the COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. In the introduction there are presented the operating experience (OPEX) program of OHN, and the OPEX Program Mission, ensuring that the right information gets to the right staff at the right time. The OPEX Processes are analysed. These are: - Internal Corrective Action; - Inter-site Lesson Transfer; - External Lesson Transfer; - External Posting of OHN Events; - Internalizing Operating Experience. Steps in solving the Corrective Action Program are described: - Identify the Problem; - Notify Immediate Supervision/Manager; - Evaluate the Problem; - Correct the Problem; Monitor/Report Status. The Internal Corrective Action is then presented as a flowchart. The internalizing operating experience is presented under three aspects: - Communication; - Interface; - Training. The following items are discussed, respectively: peer meetings, department/section meetings, safety meetings, e-mail folders, newsletters and bulletin boards; work planning, pre-job briefings, supervisors' briefing cards; classroom initial and refresher (case studies), simulator, management courses. A diagram is presented showing the flow and treatment of information within OHN, centered on the weekly screening meetings. Finally, the corrective action processes are depicted in a flowchart and analysed in details

  14. Ecological Monitoring and Compliance Program Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2001-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early

  15. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  16. Pilot program to identify valve failures which impact the safety and operation of light water nuclear power plants

    International Nuclear Information System (INIS)

    Tsacoyeanes, J.C.; Raju, P.P.

    1980-04-01

    The pilot program described has been initiated under the Department of Energy Light Water Reactor Safety Research and Development Program and has the following specific objectives: to identify the principal types and causes of failures in valves, valve operators and their controls and associated hardware, which lead to, or could lead to plant trip; and to suggest possible remedies for the prevention of these failures and recommend future research and development programs which could lead to minimizing these valve failures or mitigating their effect on plant operation. The data surveyed cover incidents reported over the six-year period, beginning 1973 through the end of 1978. Three sources of information on valve failures have been consulted: failure data centers, participating organizations in the nuclear power industry, and technical documents

  17. NATIONAL EVALUATION OF THE WEATHERIZATION ASSISTANCE PROGRAM DURING THE ARRA PERIOD: PROGRAM YEARS 2009-2011

    Energy Technology Data Exchange (ETDEWEB)

    Tonn, Bruce Edward [ORNL; Rose, Erin M [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL; Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Hendrick, Timothy P [ORNL

    2012-08-01

    This report describes the third major evaluation of the Program, encompassing program years 2009 to 2011. In this report, this period of time is referred to as the ARRA Period. This is a special period of time for the Program because the American Recovery and Reinvestment Act (ARRA) of 2009 has allocated $5 billion of funding for the Program. In normal program years, WAP s annual appropriation is in the range of $200-250 million, supporting the weatherization of approximately 100,000 homes. With the addition of ARRA funding during these program years, the expectation is that weatherization activity will exceed 300,000 homes per year. In addition to saving energy and reducing low-income energy bills, expanded WAP funding is expected to stimulate the economy by providing new jobs in the weatherization field and allowing low-income households to spend more money on goods and services by spending less on energy.

  18. AECB staff review of Bruce NGS 'A' operation for the year 1989

    International Nuclear Information System (INIS)

    1990-06-01

    The operation of the Bruce Nuclear Generating Station 'B' is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB). This report records the conclusions of the AECB staff assessment of Bruce NGS 'A' during 1989 and the early part of 1990. Overall operation of the station met acceptable safety standards. Despite numerous problems and technical difficulties encountered, station management and supervisory personnel acted with due caution and made decisions in the interests of safety. There was evidence of improvement in a number of key areas, supported by pertinent indicators in the objective measures table. The extensive inspection and maintenance programs carried out during the year revealed the extent of component deterioration due to aging to be larger than expected. Hydrogen embrittlement of pressure tubes, erosion/corrosion of steam and feed water valves, heat exchanger tubes and piping, fouling of boilers and heat exchangers, and environmental damage of electrical equipment are examples. Continued aging of plant equipment and its potential for reducing the margins for safe operation must be taken into account by Ontario Hydro in establishing priorities and target dates for completion of actions to resolve identified problems at Bruce NGS 'A'. (2 tabs.)

  19. Effectiveness of a Danish early year preschool program

    DEFF Research Database (Denmark)

    Jensen, Bente; Holm, Anders; Bremberg, Sven

    2013-01-01

    A significant number of studies indicate that early year preschool programs lead to positive long-term effects. Systematic quality improvement of early year preschool may enhance these outcomes. The ASP Program was built on this principle. In this program preschool staff are supported...... in their efforts to critically reflect on current practices and to change these. A randomized controlled study was carried out in Denmark from September 2006 to May 2008. The study encompassed 2323 children in 59 preschools in two municipalities. Children were assessed using the Strength and Difficulties...

  20. Emergency Management Operations Process Mapping: Public Safety Technical Program Study

    Science.gov (United States)

    2011-02-01

    services Operational Activity Collect and Manage Cash Donations Once activated, refer cash donations to appropriate voluntary organizations...recovery operations. Operational Activity Conduct Euthanasia /Disposal Provide humane methods to euthanize affected animals to stop the spread of the...issue stop movement orders, and initiate animal vaccination and treatment programs, euthanasia efforts, or other protective measures designed to control

  1. Eight years' operation of the SGHWR prototype

    International Nuclear Information System (INIS)

    Phillips, J.L.

    1976-01-01

    Experience gained of the SGHWR system during the first eight years of operation of the UKAEA's 100 MW(e) prototype at AEE Winfrith is discussed. Modifications and additions have been made to the plant to overcome problems which only operation of a prototype unit can reveal. No problems have arisen which could not be overcome by the application of normal engineering resources, and there is no reason why the commercial successor to the prototype should be other than a fully viable proposition. (author)

  2. Ten years's reactor operation at the Technical University Zittau - operation report

    International Nuclear Information System (INIS)

    Konschak, K.

    1990-01-01

    The Zittau Training and Research Reactor ZLFR is in use for purposes of teaching the engineers who will operate the nuclear power plants in the GDR since 10 years. Since commissioning it was started up more than 1600 times, approximately two thirds of the start-ups being utilized for purposes of teaching. A number of teaching experiments were installed that demonstrate fundamental technological processes in nuclear reactors in a manner easy to understand. The high level of nuclear safety manifests itself, among other things, in extremely low radiation exposures of the operating personal and the persons to be trained. (author)

  3. Motor-operated Valve Program at NPP Krsko (NEK) - Status and Overview

    International Nuclear Information System (INIS)

    Nikolic, M; Jagodar, N.; Cerjak, J.; Butkovic, V.

    2002-01-01

    On the basics of US NRC Generic Letter 89-10 Safety-related Motor-operated Valve Testing and Surveillance and subsequent generic letters, Motor-operated Valve (MOV) Program at NEK has been developing. Namely, the holders of nuclear power plant operating licenses has to verify the design basis capability of safety-related e.g. important-to-safety MOVs, as well as to ensure the same for the life of the plant. In light of that, each plant should establish a program to address stressed issues for each program MOV (124 at NEK). Such comprehensive task requires significant effort in many aspects, and basically multidisciplinary skills. NEK MOV Program represents a blend of engineering and in-plant testing, comprised of three phases: Phase I Engineering, Phase II Field Implementation and Phase III Trending. Currently, the program is about the end of Phase I and II, as well as in development of engineering basis for launching Phase III. Overview of the major programmatic issues will be given in this paper along with ongoing activities: testing process, gear-ratio modification, pressure locking/thermal binding susceptibility screening and preventive maintenance. (author)

  4. Status and progress of the RERTR program in the year 2002

    International Nuclear Information System (INIS)

    Travelli, Armando

    2002-01-01

    Following the cancellation of the 2001 International RERTR Meeting, which had been planned to occur in Bali, Indonesia, this paper describes the progress achieved by the Reduced Enrichment for Research and Test Reactors (RERTR) Program in collaboration with its many international partners during the years 2001 and 2002, and discusses the main activities planned for the year 2003. The past two years have been characterized by very important achievements of the RERTR program, but these technical achievements have been overshadowed by the terrible events of September 11, 2001. Those events have caused the U.S. Government to reevaluate the importance and urgency of the RERTR program goals. A recommendation made at the highest levels of the government calls for an immediate acceleration of the program activities, with the goal of converting all the world's research reactors to low-enriched fuel at the earliest possible time, and including both Soviet-designed and United States-designed research reactors. The RERTR program has prepared and submitted to the Department of Energy a plan and a schedule to achieve this goal. The plan makes full use of two very important technical developments that have occurred within the program during the past two years: - Excellent results have been obtained from the irradiation of miniplates containing monolithic LEU U-Mo fuel with uranium density of 15.6 g/cm 3 . If an economically viable manner of fabricating monolithic LEU U-Mo fuel elements is developed, and if the preliminary irradiation tests are confirmed, this fuel holds the promise of enabling LEU operation of all existing and future research reactors in combination with unprecedented performance. - The progress achieved within the Russian RERTR program, both for the traditional tube-type elements and for the new 'universal' LEU U-Mo pin-type elements, promises to enable soon the conversion of most Russian-designed research and test reactors. The plan is structured to achieve LEU

  5. SAFARI-1: 30 years of operation

    International Nuclear Information System (INIS)

    D'Arcy, A.J.; Niebuhr, H.W.; Procter, G.I.

    1995-01-01

    SAFARI-1, a 20 MW tank-in-pool type MTR, was commissioned in 1965. It today enjoys some benefits from having operated for 17 years at a quarter of its design power. Ageing technology, non-availability of spares and wear and tear are, however, beginning to take their toll, while changing licensing requirements and shifting focus in its utilisation are at the same time compelling the AEC to invest capital in renovation, refurbishment, backfitting and upgrading in several different areas. A brief look at the operating history of SAFARI-1 is followed by a discussion of some of the more important upgrades recently carried out, focussing particular attention on a redesign of the Fail-Free Power System. (orig.)

  6. Summary of LLNL's accomplishments for the FY93 Waste Processing Operations Program

    International Nuclear Information System (INIS)

    Grasz, E.; Domning, E.; Heggins, D.; Huber, L.; Hurd, R.; Martz, H.; Roberson, P.; Wilhelmsen, K.

    1994-04-01

    Under the US Department of Energy's (DOE's) Office of Technology Development (OTD)-Robotic Technology Development Program (RTDP), the Waste Processing Operations (WPO) Program was initiated in FY92 to address the development of automated material handling and automated chemical and physical processing systems for mixed wastes. The Program's mission was to develop a strategy for the treatment of all DOE mixed, low-level, and transuranic wastes. As part of this mission, DOE's Mixed Waste Integrated Program (MWIP) was charged with the development of innovative waste treatment technologies to surmount shortcomings of existing baseline systems. Current technology advancements and applications results from cooperation of private industry, educational institutions, and several national laboratories operated for DOE. This summary document presents the LLNL Environmental Restoration and Waste Management (ER and WM) Automation and Robotics Section's contributions in support of DOE's FY93 WPO Program. This document further describes the technological developments that were integrated in the 1993 Mixed Waste Operations (MWO) Demonstration held at SRTC in November 1993

  7. Post-operative delirium is associated with increased 5-year mortality.

    Science.gov (United States)

    Moskowitz, Eliza E; Overbey, Douglas M; Jones, Teresa S; Jones, Edward L; Arcomano, Todd R; Moore, John T; Robinson, Thomas N

    2017-12-01

    Post-operative delirium is associated with increased short term morbidity and mortality. Limited data exists on long term outcomes for older adults with postoperative delirium. We hypothesize that postoperative delirium is associated with increased 5-year mortality. Patients ≥50 years undergoing elective operations with planned intensive care unit (ICU) admissions were prospectively enrolled. The Confusion Assessment Method ICU (CAM-ICU) was used to diagnose delirium. The primary outcome variable was 5-year mortality. 172 patients were enrolled with an average age of 64 years. The overall incidence of delirium was 44% (75/172). At 5-years post-operatively, mortality was higher (59%, 41/70) in patients with delirium compared to patients without delirium (13%, 12/94, p delirium were 7.35 fold greater (95% CI: 1.49-36.18). Postoperative delirium is associated with increased long term mortality. Published by Elsevier Inc.

  8. Hydrogen-powered lawn mower: 14 years of operation

    International Nuclear Information System (INIS)

    Yvon, K.; Lorenzoni, J.-L.

    2006-01-01

    Our hydrogen-powered lawn mower [Yvon K, Lorenzoni J-L. Hydrogen powered lawn mower. Int J Hydrogen Energy 1993; 18, 345-48] has been operated without major interruption during the past 14 years. The commercial model was originally running on gasoline and was adapted to hydrogen by making small adjustments to the carburettor and by installing a hydrogen reservoir containing solid-state metal hydrides. During the evaluation period the only maintenance work was changing the lubricating oil of the engine once a year, and reactivating the metal hydride powder by external heating after an accidental inlet of air into the reservoir. There occurred no technical failure, and there was no safety incident, neither during operation nor during recharging of hydrogen. This demonstrates that a hydrogen-operated device of this type is mature for use by greater public. Cost and marketing issues are discussed. (author)

  9. An Assessment of Fiscal Year 2013 Beyond Yellow Ribbon Programs

    Science.gov (United States)

    2015-01-01

    Linking Program Implementation and Effective- ness: Lessons from a Pooled Sample of Welfare ‐to‐Work Experiments,” Journal of Policy Analysis and...Implementation of the Welfare -to-Work Grants Program, Washington D.C.: Urban Institute, 2002; Lauren Eyster, Demetra Smith RAND Observations Across Programs...for service members. For example, Indiana program staff are encouraged to outsource résumé development to Operation: Job Ready Vets, which already

  10. FOUR YEARS OF OPERATIONS AND RESULTS WITH FORTE

    International Nuclear Information System (INIS)

    D. ROUSSEL-DUPRE; P. KLINGNER; L. CARLSON; ET AL

    2001-01-01

    The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems

  11. Conducting an inspection of protection program operations

    International Nuclear Information System (INIS)

    Brown, S.; Howell, J.

    1987-01-01

    Protection Program Operations (PPO) encompasses the entire physical security program at a facility, including security construction and equipment, procedures, forces, management and supervision, and the integration of these elements into a total system. PPO subtopics are Physical Security Systems (PSS), Protection Forces (PF), and System Performance Tests (SPT). PSS assesses those security elements designed to protect security interests, and include sensors, surveillance devices, systems for transmission and integration of alarm and assessment information, barriers, lighting, etc. PF assesses the management, training, equipment and facilities, and skills and knowledge of the protective force. SPT includes Force-on-Force, Emergency Management Performance Test, and Limited Scope Performance Tests

  12. Isotope production and distribution Programs Fiscal Year (FY) 1995 Financial Statement Audit (ER-FC-96-01)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-12

    The charter of the Department of Energy (DOE) Isotope Production and Distribution Program (Isotope Program) covers the production and sale of radioactive and stable isotopes, associated byproducts, surplus materials such as lithium and deuterium, and related isotope services. Services provided include, but are not limited to, irradiation services, target preparation and processing, source encapsulation and other special preparations, analyses, chemical separations, and leasing of stable isotopes for research purposes. Isotope Program products and services are sold worldwide for use in a wide variety of research, development, biomedical, and industrial applications. The Isotope Program reports to the Director of the Office of Nuclear Energy, Science and Technology. The Isotope Program operates under a revolving fund, as established by the Fiscal Year 1990 Energy and Water Appropriations Act (Public Law 101-101). The Fiscal Year 1995 Appropriations Act (Public Law 103-316) modified predecessor acts to allow prices charged for Isotope Program products and services to be based on production costs, market value, the needs of the research community, and other factors. Prices set for small-volume, high-cost isotopes that are needed for research may not achieve full-cost recovery. Isotope Program costs are financed by revenues from the sale of isotopes and associated services and through payments from the isotope support decision unit, which was established in the DOE fiscal year 1995 Energy, Supply, Research, and Development appropriation. The isotope decision unit finances the production and processing of unprofitable isotopes that are vital to the national interest.

  13. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  14. Identification of Barriers Towards Change and Proposal to Institutionalize Continuous Improvement Programs in Manufacturing Operations

    Directory of Open Access Journals (Sweden)

    Alvair Silveira Torres Jr.

    2011-06-01

    Full Text Available A multi case research unfolded into a study in a sample of Brazilian manufacturing companies concerning their Continuous Improvement (CI program in manufacturing operations. Stakeholders interviews and performance analyses were conducted. The study aims to analyze the existence or absence of the institutionalization of a CI culture in manufacturing operations, identify barriers and difficulties within the process and propose a model for change. As a result of the research, it was observed that despite the considerable motivation of staff, rapid gains of the company and superior results during the early phases of the CI program, time and again such results were either not upheld or faded out over time, delivering no significant mid-term or long term results, due to poor management of changes. This happened mainly as a result of lack of strategic alignment at all levels of the organization, translated in measureable activities and projects, coached and mentored by the middle and upper management throughout the implementation and maintenance of the program. The selected cases showed a declining in performance after two years of CI program start up. Learning, union and process ownership among participants by means of interactions, are necessary to absorb and incorporate changes, instead of merely "smart words" .

  15. 20 years' operation of the Rheinsberg nuclear power plant

    International Nuclear Information System (INIS)

    Lehmann, R.; Quasniczka, H.; Fiss, W.; Hentschel, G.; Schulz, K.D.

    1986-01-01

    After a 20 years' operation of the Rheinsberg nuclear power plant a review of the operating results achieved, performance of the main equipment, research and development works performed, and experience gained with education and training of plant staff is given. (author)

  16. Preventative programs for respiratory disease in cow/calf operations.

    Science.gov (United States)

    Engelken, T J

    1997-11-01

    Control of respiratory disease in cow/calf operations presents many challenges. The incidence of disease in the suckling calf is not well documented and the logistics of handling range animals make control programs difficult to implement. Health programs have to be built around normal working patterns, and these patterns may not provide the best "fit" for immune management of the calf. Weaned calves undergo significant disease challenge when they enter typical marketing channels. This provides the potential for high levels of calf morbidity, mortality, medicine costs, and losses from decreased performance as they arrive at a stocker operation or feedyard. If preweaning calf health and preconditioning programs are used, they must be planned so that the producer has an opportunity to obtain a return on their investment. Options for increasing calf weight marketed, certified calf health sales, or retained ownership through the next phase of production should be evaluated carefully. Any potential increase in calf value must be weighed against program costs. This affords the veterinarian an opportunity to build on traditional disease management and prevention skills and expand their influence in overall ranch management.

  17. Civil Defense, U. S. A.: A Programmed Orientation to Civil Defense. Unit 4. Warning, Emergency Operations, and Support Programs.

    Science.gov (United States)

    Defense Civil Preparedness Agency (DOD), Battle Creek, MI.

    The need for, and a description of, emergency functions required to save lives and protect property in nuclear or natural disasters are presented. Topics discussed include: (1) The Civil Defense Warning System, (2) Introduction to the Emergency Operations Program, (3) Five subprograms of the Emergency Operations Program, (4) Emergency Operations…

  18. Fermi Large Area Telescope Operations: Progress Over 4 Years

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, Robert A.; /SLAC

    2012-06-28

    The Fermi Gamma-ray Space Telescope was launched into orbit in June 2008, and is conducting a multi-year gamma-ray all-sky survey, using the main instrument on Fermi, the Large Area Telescope (LAT). Fermi began its science mission in August 2008, and has now been operating for almost 4 years. The SLAC National Accelerator Laboratory hosts the LAT Instrument Science Operations Center (ISOC), which supports the operation of the LAT in conjunction with the Mission Operations Center (MOC) and the Fermi Science Support Center (FSSC), both at NASA's Goddard Space Flight Center. The LAT has a continuous output data rate of about 1.5 Mbits per second, and data from the LAT are stored on Fermi and transmitted to the ground through TDRS and the MOC to the ISOC about 10 times per day. Several hundred computers at SLAC are used to process LAT data to perform event reconstruction, and gamma-ray photon data are subsequently delivered to the FSSC for public release with a few hours of being detected by the LAT. We summarize the current status of the LAT, and the evolution of the data processing and monitoring performed by the ISOC during the first 4 years of the Fermi mission, together with future plans for further changes to detected event data processing and instrument operations and monitoring.

  19. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  20. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  1. Water Treatment Plant Operation. Volume II. A Field Study Training Program.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  2. Water Treatment Plant Operation. Volume I. A Field Study Training Program.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  3. Federal Geothermal Research Program Update Fiscal Year 1998

    Energy Technology Data Exchange (ETDEWEB)

    Keller, J.G.

    1999-05-01

    This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

  4. Advanced Transport Operating Systems Program

    Science.gov (United States)

    White, John J.

    1990-01-01

    NASA-Langley's Advanced Transport Operating Systems Program employs a heavily instrumented, B 737-100 as its Transport Systems Research Vehicle (TRSV). The TRSV has been used during the demonstration trials of the Time Reference Scanning Beam Microwave Landing System (TRSB MLS), the '4D flight-management' concept, ATC data links, and airborne windshear sensors. The credibility obtainable from successful flight test experiments is often a critical factor in the granting of substantial commitments for commercial implementation by the FAA and industry. In the case of the TRSB MLS, flight test demonstrations were decisive to its selection as the standard landing system by the ICAO.

  5. Program management aid for redundancy selection and operational guidelines

    Science.gov (United States)

    Hodge, P. W.; Davis, W. L.; Frumkin, B.

    1972-01-01

    Although this criterion was developed specifically for use on the shuttle program, it has application to many other multi-missions programs (i.e. aircraft or mechanisms). The methodology employed is directly applicable even if the tools (nomographs and equations) are for mission peculiar cases. The redundancy selection criterion was developed to insure that both the design and operational cost impacts (life cycle costs) were considered in the selection of the quantity of operational redundancy. These tools were developed as aids in expediting the decision process and not intended as the automatic decision maker. This approach to redundancy selection is unique in that it enables a pseudo systems analysis to be performed on an equipment basis without waiting for all designs to be hardened.

  6. IEA-R1 Nuclear Research Reactor: 58 Years of Operating Experience and Utilization for Research, Teaching and Radioisotopes Production

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas, Jose Patricio Nahuel; Filho, Tufic Madi; Saxena, Rajendra; Filho, Walter Ricci [Nuclear and Energy Research Institute, IPEN-CNEN/SP, Instituto de Pesquisas Energeticas e Nucleares - IPEN-CNEN/SP, Av. Prof. Lineu Prestes 2242 Cid Universitaria CEP: 05508-000- Sao Paulo-SP (Brazil)

    2015-07-01

    IEA-R1 research reactor at the Instituto de Pesquisas Energeticas e Nucleares (Nuclear and Energy Research Institute) IPEN, Sao Paulo, Brazil is the largest power research reactor in Brazil, with a maximum power rating of 5 MWth. It is being used for basic and applied research in the nuclear and neutron related sciences, for the production of radioisotopes for medical and industrial applications, and for providing services of neutron activation analysis, real time neutron radiography, and neutron transmutation doping of silicon. IEA-R1 is a swimming pool reactor, with light water as the coolant and moderator, and graphite and beryllium as reflectors. The reactor was commissioned on September 16, 1957 and achieved its first criticality. It is currently operating at 4.5 MWth with a 60-hour cycle per week. In the early sixties, IPEN produced {sup 131}I, {sup 32}P, {sup 198}Au, {sup 24}Na, {sup 35}S, {sup 51}Cr and labeled compounds for medical use. During the past several years, a concerted effort has been made in order to upgrade the reactor power to 5 MWth through refurbishment and modernization programs. One of the reasons for this decision was to produce {sup 99}Mo at IPEN. The reactor cycle will be gradually increased to 120 hours per week continuous operation. It is anticipated that these programs will assure the safe and sustainable operation of the IEA-R1 reactor for several more years, to produce important primary radioisotopes {sup 99}Mo, {sup 125}I, {sup 131}I, {sup 153}Sm and {sup 192}Ir. Currently, all aspects of dealing with fuel element fabrication, fuel transportation, isotope processing, and spent fuel storage are handled by IPEN at the site. The reactor modernization program is slated for completion by 2015. This paper describes 58 years of operating experience and utilization of the IEA-R1 research reactor for research, teaching and radioisotopes production. (authors)

  7. Impact of Demand Response Programs on Optimal Operation of Multi-Microgrid System

    Directory of Open Access Journals (Sweden)

    Anh-Duc Nguyen

    2018-06-01

    Full Text Available The increased penetration of renewables is beneficial for power systems but it poses several challenges, i.e., uncertainty in power supply, power quality issues, and other technical problems. Backup generators or storage system have been proposed to solve this problem but there are limitations remaining due to high installation and maintenance cost. Furthermore, peak load is also an issue in the power distribution system. Due to the adjustable characteristics of loads, strategies on demand side such as demand response (DR are more appropriate in order to deal with these challenges. Therefore, this paper studies how DR programs influence the operation of the multi-microgrid (MMG. The implementation is executed based on a hierarchical energy management system (HiEMS including microgrid EMSs (MG-EMSs responsible for local optimization in each MG and community EMS (C-EMS responsible for community optimization in the MMG. Mixed integer linear programming (MILP-based mathematical models are built for MMG optimal operation. Five scenarios consisting of single DR programs and DR groups are tested in an MMG test system to evaluate their impact on MMG operation. Among the five scenarios, some DR programs apply curtailing strategies, resulting in a study about the influence of base load value and curtailable load percentage on the amount of curtailed load and shifted load as well as the operation cost of the MMG. Furthermore, the impact of DR programs on the amount of external and internal trading power in the MMG is also examined. In summary, each individual DR program or group could be handy in certain situations depending on the interest of the MMG such as external trading, self-sufficiency or operation cost minimization.

  8. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  9. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  10. The Tore Supra control, computer system : six years of operation and improvements

    International Nuclear Information System (INIS)

    Journeaux, J.Y.; Badie, O.; Chatelier, E.; Hennion, F.; Lebourg, P.; Leveque, P.; Hernandez, M.; Moulin, D.

    1995-01-01

    The Tore Supra control computer system has been providing a good operation of the Tore Supra machine for six years. It controls all of the sub-systems, the continuous ones as well as the sequential ones, and the automatic operation is very efficient. The control system has been programmed by the users themselves thanks to its user-friendly qualities, in order to keep the full control and knowledge of the automatisms. Nevertheless, some improvements are now necessary. Their main principles are : to choose ergonomic and powerful tools, industrial standards, and to keep the users's participation. The whole control system will be upgraded : the automatism level as well as the display level and the communication networks. The operator's driving job is analysed as supervisory and diagnostic tasks which have an effect on the Tore Supra machine efficiency. So a very powerful driving software has been chosen and linked with an expert system, which is to be designed and implemented with the aim to give an immediate accurate and global understanding of the process and situations, in particular in case of trouble. The method is based on an artificial intelligence approach, and it exploits both the process' informations and automatisms' steps, to determine the process state, next possible states and diagnosis of the process troubles. (orig.)

  11. Ten years of Developing International Volcanology Graduate Study Programs

    Science.gov (United States)

    Rose, W. I.

    2010-12-01

    In 2000 I reported at this symposium about multi-institutional graduate field trips to IAVCEI events, such as the Bali meeting and its importance in building international collegiality and awareness among the volcanology doctoral students. NSF was an enthusiastic supporter of these field sessions and this support has continued through the highly successful Pucon and Reykjavik sessions. International volcanology graduate program development began with several exchange programs. EHaz was a highly successful program (McGill, Simon Fraser, Michigan Tech, Buffalo, UNAM and Universidad de Colima) funded by the Department of Education (FIPSE) that moved students across North America where dozens of graduate students spent semesters of their study abroad and shared annual field trips and online student led graduate seminar classes. Michigan Tech’s volcanology graduate program started a Masters International program that combined Peace Corps service with hazards mitigation graduate study and students were placed by Peace Corps in countries with prominent natural hazards. The new program funded 2 year residences in foreign environments, principally in Pacific Latin America. NSF strongly supported this program from its inception, and eventually it gained NSF PIRE support. Dozens of students have initiated the 3 year program (15 completed) to date. A similar PIRE developed at UAF with a link to volcanology in the Russian Far East. One gain is the development of many socially-conscious research selections. Beginning this year transatlantic dual degree masters programs in volcanology are being offered by a consortium of US and European volcanology programs (Michigan Tech, Buffalo, Clermont Ferrand and University of Milan Bicocca), again aided by FIPSE funding. Students have dual advisors on both sides of the Atlantic and spend about half of their two year programs in Europe and half in US. Faculty also travel in the program and the four campuses are increasingly linked by

  12. Space operation system for Chang'E program and its capability ...

    Indian Academy of Sciences (India)

    investment. Due to the constraint in program cost, space operation for China's first lunar exploration program will be provided by the aerospace TT&C network designed for China's manned space pro- gram. The TT&C network consists of a ... foreign spacecrafts and for five spaceships in flight experiments of China's manned ...

  13. The development of natural circulation operation support program for ship nuclear power machinery

    International Nuclear Information System (INIS)

    Hao, Jianli; Chen, Wenzhen; Chen, Zhiyun

    2012-01-01

    Highlights: ► The natural circulation under various ocean and ship motion conditions is studied. ► A natural circulation operation support computer program (NCOSP) is developed with Simulink. ► The NCOSP program has the merit of easy input preparation, fast and accurate simulation. ► The NCOSP is suitable for the fast parameter simulation of ship nuclear power machinery. -- Abstract: The existing simulation program of ship nuclear power machinery (SNPM) cannot adequately deal with the natural circulation (NC) operation and the effects of various ocean conditions and ship motion. Aiming at the problem, the natural circulation operation support computer program for SNPM is developed, in which the momentum conservation equation of the primary loop, some heat transfer and flow resistance models and equations are modified for the various ocean conditions and ship motion. The additional pressure loss model and effective height model for the control volume in the gyration movement, simple harmonic rolling and pitching movements are also discussed in the paper. Furthermore, the transient response to load change under NC conditions is analyzed by the developed program. The results are compared with those predicted by the modified RELAP5/mod3.2 code. It is shown that the natural circulation operation support program (NCOSP) is simple in the input preparation, runs fast and has a satisfactory precision, and is therefore very suitable for the operating field support of SNPM under the conditions of NC.

  14. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  15. Overview of the SEU project for extended burnup at the Atucha-I NPP. Four years of operating experience

    International Nuclear Information System (INIS)

    Fink, J.M.; Higa, M.; Perez, R.; Pineyro, J.; Sidelnik, J.; Casario, J.A.; Alvarez, L.

    2002-01-01

    Atucha I is a 357 MWe nuclear station moderated and cooled with heavy water, of German design located in Argentina. Fuelling is on-power and the plant was originally fuelled with natural uranium. To reduce fuel costs a program was initiated in August 1993 to introduce gradually slightly enriched uranium (SEU) fuel (0.85 w% U-235) with an associated burnup increase from 5900 MWd/tU to 11300 MWd/tU. The introduction of SEU fuel started in January 1995 and the program was divided in three Phases with an upper limit of SEU FA in the core: 12, 60 and 252 (full core) and licensing documentation was prepared for each Phase. This paper describes the most important aspects of the operating and project experience, and some factors limiting the burnup extension from an operation point of view. After four years of the program and with 181 SEU FA (71%) of the core, the operating experience has been good and without unfavourable effects due to the use of SEU fuel with the only exception of a small increase of the time to reach full power in plant startups or power cycling. In particular, the new criteria to prevent PCI failures in power ramps for higher burnup SEU fuel in refueling operations, plant startups or power cycling has been effective. The average discharge burnup of the SEU fuel taken out of the reactor in 1998 was 11263 MWd/tU. The average discharge burnup of the natural fuel in the same year was 6640 MWd/tU, with an increase of about 12% of the original value for a natural fuel core. The average number of fresh fuel assemblies per full power day was being reduced from 1.31 to 0.92 in 1998 and 0.83 in 1999. The fuel costs dropped gradually during the program from 9.38 (with natural uranium fuel) to 6.57 $/MWh in the first four months of 1999 (taking as reference the NU and SEU FA costs for 1999). Because of this the SEU program has been an important contribution to the reduction of Atucha I operating costs and to the competitiveness of nuclear power generation against

  16. Bringing the Incredible Years® Programs to Scale

    Science.gov (United States)

    Webster-Stratton, Carolyn; McCoy, Kathleen P.

    2015-01-01

    The Incredible Years® (IY) program series is a set of interlocking and comprehensive training programs for parents, teachers, and children. This article briefly reviews the theoretical foundations, goals, and research underlying these programs. The main purpose of the paper is to describe how the IY programs have been scaled up slowly and…

  17. Radioactive Waste Management Fellowship Program: Summary of program activities for calendar year 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This document describes a graduate fellowship program designed to guide future scientists and engineers toward a career in high level radioactive waste management. Oak Ridge Associated Universities administers this program on behalf of 17 participating universities. The report summarizes the background and qualifications of the last year's applicants and awardees and provides examples of the distributed literature describing the program. 8 figs

  18. Inpo programs for improvement of nuclear power plant operations

    International Nuclear Information System (INIS)

    Edward Moore, C.

    1989-01-01

    The talk shows how key INPO programs help foster improved nuclear power operations. The talk focuses on the results being seen from six key efforts: evaluations, training and accreditation, assistance, events analysis and information exchange, human performance and maintenance. The talk stresses that all INPO programs are geared toward enhanced performance and that progress in key performance areas since 1980 shows that INPO and U.S. industry efforts are achieving desired results

  19. Monitoring of good practices programs and independence for electricity and natural gas system operators in 2015 and 2016. Follow-up report, January 2017

    International Nuclear Information System (INIS)

    2017-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 10. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the 2015-2016 period. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in 2015-2016 and audits carried out by the CRE services in these companies during the same period

  20. Calendar Year 2008 Program Benefits for ENERGY STAR Labeled Products

    Energy Technology Data Exchange (ETDEWEB)

    Homan, GregoryK; Sanchez, Marla; Brown, RichardE; Lai, Judy

    2010-08-24

    This paper presents current and projected savings for ENERGY STAR labeled products, and details the status of the model as implemented in the September 2009 spreadsheets. ENERGY STAR is a voluntary energy efficiency labeling program operated jointly by the Environmental Protection Agency (US EPA) and the U.S. Department of Energy (US DOE), designed to identify and promote energy-efficient products, buildings and practices. Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products, and currently labels more than thirty products, spanning office equipment, heating, cooling and ventilation equipment, commercial and residential lighting, home electronics, and major appliances. ENERGY STAR's central role in the development of regional, national and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with stakeholders. This report presents savings estimates for ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2008, annual forecasts for 2009 and 2010, and cumulative savings estimates for the period 1993 through 2008 and cumulative forecasts for the period 2009 through 2015. Through 2008 the program saved 8.8 Quads of primary energy and avoided the equivalent of 158 metric tones carbon (MtC). The forecast for the period 2009-2015 is 18.1 Quads or primary energy saved and 316 MtC emissions avoided. The sensitivity analysis bounds the best estimate of carbon avoided between 104 MtC and 213 MtC (1993 to 2008) and between 206 MtC and 444 MtC (2009 to 2015). In this report we address the following questions for ENERGY STAR labeled products: (1) How are ENERGY STAR impacts quantified; (2) What are the ENERGY STAR achievements; and (3) What are the limitations to our method?

  1. Ecological Monitoring and Compliance Program Fiscal Year 2001 report

    International Nuclear Information System (INIS)

    Wills, C.A.

    2001-01-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A

  2. Five years of operating experience with Phenix

    International Nuclear Information System (INIS)

    Conte, F.

    1980-01-01

    The construction of Phenix began at the end of 1968; the unit first went critical on August 31 st, 1973, and it was first connected to the grid of Electricite de France on 31st December 1973. It started operating industrially on July 14th, 1974. The balance sheet after five years of operations is as follows: Gross thermal capacity: 590 MW; Grosss electric capacity: 264 MW; Gross capacity factor of the power station: 45%; Gross electrical power produced by 30th september 1979: more than six billion kWh. In 1976 and 1977 the operation of the plant was affected by modifications made to the intermediate heat exchangers following leaks discovered in October 1976. Since 1976 the plants has been working at full capacity and the availability rate during the period July 1978 - July 1979 was more than 80% [fr

  3. 25 CFR 39.137 - May schools operate a language development program without a specific appropriation from Congress?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false May schools operate a language development program... Formula Language Development Programs § 39.137 May schools operate a language development program without a specific appropriation from Congress? Yes, a school may operate a language development program...

  4. A Statewide Examiniation of Mental Health Courts in Illinois: Program Characteristics and Operations

    Directory of Open Access Journals (Sweden)

    Arthur J. Lurigio

    2015-07-01

    Full Text Available This study represents the only broad-based, statewide evaluation of mental health courts (MHCs conducted to date.  Data were collected from 2010 to 2013 at each of the nine active MHC programs operating in Illinois at the start of the study. The purpose of the study was to compare and contrast the adjudicatory and supervisory models of each established Illinois MHC program by utilizing a variety of research methodologies. A four-year recidivism analysis of case-level data from three Illinois MHCs was also conducted. Illinois MHCs were largely characterized by the '10 essential elements of an MHC', such as voluntary participation, informed choice and hybrid team approaches to case manage clients. Results of the recidivism analysis suggest that MHCs compare favorably to other types of probation. Overall, findings revealed that Illinois MHCs are delivering services effectively and efficiently in a well-coordinated, client-centered team approach. Differences found among the MHCs are not evidence of significant variance from the model, and instead represent responsiveness to the unique culture of the court, the niche-filling character of the program, the expectations of the program stakeholders and the nature and extent of the local service environment.

  5. Trends in workers compensation costs in a hotel-operating company over a six-year period.

    Science.gov (United States)

    Kelley, C R; Mark, C R

    1995-03-01

    A large Honolulu-based hotel-operating company reviewed its workers compensation costs over the last 6 years. Data retrieved from the company's computerized data base is used to describe trends in injury incidence rate, average cost per claim, average medical cost per claim, and medical expenses as a percentage of total costs. Factors that might have influenced these parameters include company reorganization, employee training and safety programs, changes in the economy, company morale, aggressive case management, and the quality of the adjusting services hired. Cause-and-effect relationships, although suggested, cannot be proven. The data is presented, in this year of imminent workers compensation legislative reform, to increase the available factual data base on which rational and efficacious reform proposals can be developed.

  6. DOE radiological calibrations intercomparison program: Results of fiscal year 1986

    International Nuclear Information System (INIS)

    Cummings, F.M.; Roberson, P.L.; McDonald, J.C.

    1987-05-01

    The Department of Energy Radiological Calibration Intercomparison Program was initiated in January 1986, under the research portion of the DOE Laboratory Accreditation Program. The program operates via the exchange of transfer standards, consisting of instrument sets and standard secondary beta sources. There are two instrument sets and the scheduled use has been staggered such that one set is available for use during each month. One set of secondary standard beta sources is available for use bimonthly. During the 1986 fiscal year, five laboratories used the instrument sets and three laboratories used the beta source set. Results were reported for all the measurements. The average and one standard deviation of the ratios of participant results to Pacific Northwest Laboratory calibration values were 1.12 +- 0.17 for gamma measurements. Those ratios for the gamma measurements varied from 0.98 to 3.06. The larger differences of results from measurements performed at two facilities were directly attributable to unfamiliarity with the intercomparison instruments. The average and one standard deviation of the ratios of participant results to PNL calibration values obtained using the secondary 90 Sr beta source was 1.02 +- 0.05, which is well within measurement uncertainties. The one participant who performed measurements using 147 Pm and 204 Tl sources obtained ratios of 0.68 and 1.11, respectively. No measurements were performed using neutron or x-ray sources

  7. Optimal year-round operation of a concentrated solar energy plant in the south of Europe

    International Nuclear Information System (INIS)

    Martín, Lidia; Martín, Mariano

    2013-01-01

    We present the year-round optimization of the operation of a concentrated solar power facility evaluating the molten salts storage, the power block and cooling. We locate the plant in the south of Europe, Almería (Spain), where high solar radiation is available. The operation of the plant is a function of the solar incidence as well as the climate and atmospheric conditions. The optimization of the system is formulated as a multiperiod Non-linear Programming problem (NLP) that is solved for the optimal production of electricity over a year defining the main operating variables of the thermal and cooling cycles. For a maximum of 25 MW in summer and a minimum of 9.5 MW in winter the annual production cost of electricity is 0.15 €/kWh consuming an average of 2.1 L water /kWh. The investment for the plant is 260 M€. Scale-up studies reveal that the production cost can decrease by half while the investment per unit of power should become competitive with current coal based power plants if solar and coal facilities present similar production capacities. -- Highlights: • Plant design so far relies on process simulation and only partial optimization studies. • We optimize the operation of a concentrated solar power plant. • The facility involves solar field, molten salts, steam and electricity generation and cooling. • The results are promising and validate literature sensitive studies

  8. Solar buildings program contract summary, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-07

    The mission of the US Department of Energy's Solar Buildings Program is to advance the development and widespread deployment of competitive solar thermal technologies for use in buildings. The long-term goal of the Program is to combine solar energy technologies with energy-efficient construction techniques and create cost-effective buildings that have a zero net need for fossil fuel energy on an annual basis. The Solar Buildings Program conducts research and development on solar technologies that can deliver heat, light, and hot water to residential and commercial buildings. By working closely with manufacturers in both the buildings and solar energy industries and by supporting research at universities and national laboratories, the Solar Buildings Program brings together the diverse players developing reliable and affordable solar technologies for building applications. The National Renewable Energy Laboratory (NREL) in Golden, Colorado, and Sandia National Laboratories (SNL) in Albuquerque, New Mexico, jointly participate in the Solar Buildings Program. These two national laboratories work closely with industry researching new concepts, developing technology improvements, reducing manufacturing costs, monitoring system performance, promoting quality assurance, and identifying potential new markets. In calendar year 1999, the Solar Buildings Program focused primarily on solar hot water system research and development (R and D), US industry manufacturing assistance, and US market assistance. The Program also completed a number of other projects that were begun in earlier years. This Contract Summary describes the Program's contracted activities that were active during 1999.

  9. DOE Radiological Calibrations Intercomparison Program: Results of fiscal year 1987

    International Nuclear Information System (INIS)

    Cummings, F.M.; McDonald, J.C.

    1988-06-01

    This report presents the FY 1987 results of the radiological calibrations intercomparison program. The intercomparison operation is discussed, and the equipment is described, particularly the instrument set, the beta source set, and relevant calculations. Solutions to problems and improvements in the program are suggested, and conclusions are then introduced. 9 refs., 3 figs., 8 tabs

  10. Ecological Monitoring and Compliance Program Fiscal Year 2000 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wills, C.A.

    2000-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition

  11. An analysis of the impacts of economic incentive programs on commercial nuclear power plant operations and maintenance costs

    International Nuclear Information System (INIS)

    Kavanaugh, D.C.; Monroe, W.H.; Wood, R.S.

    1996-02-01

    Operations and Maintenance (O and M) expenditures by nuclear power plant owner/operators possess a very logical and vital link in considerations relating to plant safety and reliability. Since the determinants of O and M outlays are considerable and varied, the potential linkages to plant safety, both directly and indirectly, can likewise be substantial. One significant issue before the US Nuclear Regulatory Commission is the impact, if any, on O and M spending from state programs that attempt to improve plant operating performance, and how and to what extent these programs may affect plant safety and pose public health risks. The purpose of this study is to examine the role and degree of impacts from state promulgated economic incentive programs (EIPs) on plant O and M spending. A multivariate regression framework is specified, and the model is estimated on industry data over a five-year period, 1986--1990. Explanatory variables for the O and M spending model include plant characteristics, regulatory effects, financial strength factors, replacement power costs, and the performance incentive programs. EIPs are found to have statistically significant effects on plant O and M outlays, albeit small in relation to other factors. Moreover, the results indicate that the relatively financially weaker firms are more sensitive in their O and M spending to the presence of such programs. Formulations for linking spending behavior and EIPs with plant safety performance remains for future analysis

  12. Long Term Operation for EDF Nuclear Power Plants : Towards 60 years

    International Nuclear Information System (INIS)

    Ternon-Morin, Francoise; Degrave, Claude

    2012-01-01

    The lifetime extension of the French nuclear fleet, significantly beyond 40 years (initial design basis) is presently one of the major objectives for EDF, in order to smooth the commissioning flow for the new build program. A lifetime extension up to 60 years should be reasonably achieved, owing to the compliance with additional safety and environmental requirements, an adequate LTO strategy including an exceptional maintenance program periodically updated, and a LTO support program (R and D) consisting of aging knowledge improvement and decision-making tools and methods. The LTO program is illustrated with some examples of replaceable components and a focus is placed on the complementary analysis in progress for RPV and containment safety assessment. (author)

  13. Exploring impacts of multi-year, community-based care programs for orphans and vulnerable children: a case study from Kenya.

    Science.gov (United States)

    Larson, Bruce A; Wambua, Nancy; Masila, Juliana; Wangai, Susan; Rohr, Julia; Brooks, Mohamad; Bryant, Malcolm

    2013-01-01

    The Community-Based Care for Orphans and Vulnerable Children (CBCO) program operated in Kenya during 2006-2010. In Eastern Province, the program provided support to approximately 3000 orphans and vulnerable children (OVC) living in 1500 households. A primary focus of the program was to support savings and loan associations composed of OVC caregivers (typically elderly women) to improve household and OVC welfare. Cross-sectional data were collected in 2011 from 1500 randomly selected households from 3 populations: program participants (CBCO group, n=500), households in the same villages as program participants but not in the program (the local-community-group = Group L, n=300), and households living in nearby villages where the program did not operate (the adjacent-community-group, Group A, n=700). Primary welfare outcomes evaluated are household food security, as measured by the Household Food Insecurity Access instrument, and OVC educational attainment. We compared outcomes between the CBCO and the subset of Group L not meeting program eligibility criteria (L-N) to investigate disparities within local communities. We compared outcomes between the CBCO group and the subset of Group A meeting eligibility criteria (A-E) to consider program impact. We compared outcomes between households not eligible for the program in the local and adjacent community groups (L-N and A-N) to consider if the adjacent communities are similar to the local communities. In May-June 2011, at the end of the OVC program, the majority of CBCO households continued to be severely food insecure, with rates similar to other households living in nearby communities. Participation rates in primary school are high, reflecting free primary education. Among the 18-22 year olds who were "children" during the program years, relatively few children completed secondary school across all study groups. Although the CBCO program likely provided useful services and benefits to program participants, disparities

  14. Federal Geothermal Research Program Update - Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    Laney, P.T.

    2002-08-31

    This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  15. EDF EPR project: operating principles validation and human factor engineering program

    International Nuclear Information System (INIS)

    Lefebvre, B.; Berard, E.; Arpino, J.-M.

    2005-01-01

    This article describes the specificities of the operating principles chosen by EDF for the EPR project as a result of an extensive Human Factor Engineering program successfully implemented in an industrial project context. The design process and its achievements benefit of the EDF experience feedback not only in term of NPP operation - including the fully computerized control room of the N4-serie - but also in term of NPP designer. The elements exposed hereafter correspond to the basic design phase of EPR HMI which has been completed and successfully validated by the end of 2003. The article aims to remind the context of the project which basically consists in designing a modern and efficient HMI taking into account the operating needs while relying on proven and reliable technologies. The Human Factor Engineering program implemented merges these both aspects by : 1) being fully integrated within the project activities and scheduling; 2) efficiently taking into account the users needs as well as the feasibility constraints by relying on a multidisciplinary design team including HF specialists, I and C specialists, Process specialists and experienced operator representatives. The resulting design process makes a wide use of experience feedback and experienced operator knowledge to complete largely the existing standards for providing a fully useable and successful design method in an industrial context. The article underlines the design process highlights that largely contribute to the successful implementation of a Human Factor Engineering program for EPR. (authors)

  16. Water Treatment Plant Operation Volume 2. A Field Study Training Program. Revised.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  17. KSC SBIR/STTR 2004 Program Year Report

    Science.gov (United States)

    2005-01-01

    developed by a research institution through the entrepreneurship of a small business. The STIR program is smaller in funding than the SBIR program. While the proposal is submitted by the small business concern, at least 30 percent of the funding and work must originate with the research institution. STTR Phase I projects receive up to $100K for a one-year effort, and a Phase II contract receives up to $600K for two years.

  18. Laser Programs, the first 25 years, 1972-1997

    International Nuclear Information System (INIS)

    Campbell, E.M.

    1998-01-01

    Welcome to Laser Programs. I am pleased that you can share in the excitement of 25 years of history since we began as a small program of 125 people to our current status as a world premier laser and applied science research team of over 1700 members. It is fitting that this program, which was founded on the dream of developing inertial confinement fusion technology, should celebrate this anniversary the same year that the ground is broken for the National Ignition Facility (NIF). Also at the same time, we are feeling the excitement of moving forward the Atomic Vapor Laser Isotope Separation (AVLIS) technology toward private sector use and developing many alternate scientific applications and technologies derived from our core programs. It is through the hard work of many dedicated scientists, engineers, technicians, and administrative team members that we have been able to accomplish the remarkable internationally recognized achievements highlighted here. I hope this brochure will help you enjoy the opportunity to share in the celebration and pride of our scientific accomplishments; state-of-the-art facilities; and diligent, dedicated people that together make our Laser Programs and Lawrence Livermore National Laboratory the best in the world

  19. Outcomes of operations for benign foregut disease in elderly patients: a National Surgical Quality Improvement Program database analysis.

    Science.gov (United States)

    Molena, Daniela; Mungo, Benedetto; Stem, Miloslawa; Feinberg, Richard L; Lidor, Anne O

    2014-08-01

    The development of minimally invasive operative techniques and improvement in postoperative care has made surgery a viable option to a greater number of elderly patients. Our objective was to evaluate the outcomes of laparoscopic and open foregut operation in relation to the patient age. Patients who underwent gastric fundoplication, paraesophageal hernia repair, and Heller myotomy were identified via the National Surgical Quality Improvement Program (NSQIP) database (2005-2011). Patient characteristics and outcomes were compared between five age groups (group I: ≤65 years, II: 65-69 years; III: 70-74 years; IV: 75-79 years; and V: ≥80 years). Multivariable logistic regression analysis was used to predict the impact of age and operative approach on the studied outcomes. A total of 19,388 patients were identified. Advanced age was associated with increased rate of 30-day mortality, overall morbidity, serious morbidity, and extended length of stay, regardless of the operative approach. After we adjusted for other variables, advanced age was associated with increased odds of 30-day mortality compared with patients <65 years (III: odds ratio 2.70, 95% confidence interval 1.34-5.44, P = .01; IV: 2.80, 1.35-5.81, P = .01; V: 6.12, 3.41-10.99, P < .001). Surgery for benign foregut disease in elderly patients carries a burden of mortality and morbidity that needs to be acknowledged. Copyright © 2014 Mosby, Inc. All rights reserved.

  20. Mercury Deposition Network Site Operator Training for the System Blank and Blind Audit Programs

    Science.gov (United States)

    Wetherbee, Gregory A.; Lehmann, Christopher M.B.

    2008-01-01

    The U.S. Geological Survey operates the external quality assurance project for the National Atmospheric Deposition Program/Mercury Deposition Network. The project includes the system blank and blind audit programs for assessment of total mercury concentration data quality for wet-deposition samples. This presentation was prepared to train new site operators and to refresh experienced site operators to successfully process and submit system blank and blind audit samples for chemical analysis. Analytical results are used to estimate chemical stability and contamination levels of National Atmospheric Deposition Program/Mercury Deposition Network samples and to evaluate laboratory variability and bias.

  1. An augmented audit program for assuring radiation safety during radiographic examination operations

    International Nuclear Information System (INIS)

    Jervey, R.A. Jr.; Papin, P.J.

    1993-01-01

    Auditing a gamma radiography program is required as part of the authorizing license. Checklists and cursory reviews are the typical approach to addressing program requirements. A more proactive approach is recommended. The audit program described was prepared for a specific set of operating conditions but can be applied to any given program. Improvements in the effectiveness of the radiography safety program can be made with additional examination and emphasis on direct observation of licensed activities

  2. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  3. Head Start, 4 years After Completing the Program

    Science.gov (United States)

    Kim, Young-Joo

    2013-01-01

    This paper studies the effect of the Head Start program on children's achievements in reading and math tests during their first 4 years of schooling after completing the program. Using nationally representative data from the Early Childhood Longitudinal Study, I found large measurement error in the parental reports of Head Start attendance, which…

  4. Mixing and matching Bevalac programs: Rapid-switching of ions and other operations highlights: Progress report

    International Nuclear Information System (INIS)

    Lothrop, F.; Alonso, J.; Krebs, G.; Miller, R.; Stevenson, R.

    1987-03-01

    Rapid switching of ion, energy, and beam line has been accomplished on a routine basis; typical transfer time is 1 to 2 minutes in worst case situations. Operational efficiency has been improved by substantial reduction of inter-experiment tune time and improved optics in the external beam area installed in 1985. A comparison of current research efficiency and previous year efficiency is given. It is shown that compatibility and productivity for two simultaneous, independent research programs are not mutually exclusive

  5. Program encourages use of renewable energies in Algeria-20 co-operative projects by sonelgaz in one year

    International Nuclear Information System (INIS)

    Khiat, Z.; Stambouli, A. Boudghene

    2006-01-01

    The renewable energy projects are tools for the management of reserves and sustainable development of desert communities. These are generally areas wher a diesel or gas-powered generator present a problem of fuel transportation and may potentially harm the environment. Tremendous opportunities exist in Algeria for growth in the use of renewable energy technologies in particular photovoltaic solar power. According to some estimates, more than five million Algerians do not have access to grid electricity, while many rural communities are in need of drinking water and water for livestock or irrigation. Given Algerian's abundant solar resource, these rural needs represent a potential market for renewable energy technologies. Nowadays a growing number of people in the south of Algeria are using renewable energy to irrigate their land, light their houses, pump well water and then improve their lives, thanks to the 'Ministere de l'Energie et des Mines' and the Sonelgaz (Societe Nationale de l'Electricite et du Gaz) R and D office. From 1999 up 2002. Sonelgaz Renewable Energy Program, and the above mentioned ministry have collaborated and sponsored several photovoltaic projects in 20 villages of the desert of Algeria concerning this renewable energy program aiming at increasing the use of renewable energy technologies, thus providing green power to isolated villages. Sonelgaz's role in the project is to initiate renewable energy pilot projects that could be easily replicated by area residents and provide training with technical assistance. Based on its feasibility, potential projecs are initially identified and selected by the Sonelgaz R and D office which develops system requirements, provides technical review, evaluates and monitors the projects following their installation. Since 1999, Sonelgaz has received 988 millions of DA (Algerian Dinars) to operate the program. Most activities focus on house lighting and implementing water pumping systems. For most of these

  6. Forty years of training program in the JAERI

    International Nuclear Information System (INIS)

    1998-03-01

    This report is to compile the past training program of researchers, engineers and regulatory members at the NuTEC (Nuclear Technology and Education Center) of Japan Atomic Energy Research Institute and the past basic seminars for the public, in addition to advice and perspective on the future program from relevant experts, in commemoration of the forty years of the NuTEC. It covers the past five years of educational courses and seminars in utilization of radioisotopes and nuclear energy for domestic and for international training provided at Tokyo and Tokai Education Centers and covers the activity of the Asia-Pacific nuclear technology transfer, including the activity of various committees and meetings. Especially, fifty six experts and authorities have contributed to the report with positive advice and perspective on the training program in the 21st century based on their reminiscences. (author)

  7. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  8. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  9. Summary of NRC LWR safety research programs on fuel behavior, metallurgy/materials and operational safety

    International Nuclear Information System (INIS)

    Bennett, G.L.

    1979-09-01

    The NRC light-water reactor safety-research program is part of the NRC regulatory program for ensuring the safety of nuclear power plants. This paper summarizes the results of NRC-sponsored research into fuel behavior, metallurgy and materials, and operational safety. The fuel behavior research program provides a detailed understanding of the response of nuclear fuel assemblies to postulated off-normal or accident conditions. Fuel behavior research includes studies of basic fuel rod properties, in-reactor tests, computer code development, fission product release and fuel meltdown. The metallurgy and materials research program provides independent confirmation of the safe design of reactor vessels and piping. This program includes studies on fracture mechanics, irradiation embrittlement, stress corrosion, crack growth, and nondestructive examination. The operational safety research provides direct assistance to NRC officials concerned with the operational and operational-safety aspects of nuclear power plants. The topics currently being addressed include qualification testing evaluation, fire protection, human factors, and noise diagnostics

  10. The National Library of Medicine Programs and Services, Fiscal Year 1974.

    Science.gov (United States)

    National Library of Medicine (DHEW), Bethesda, MD.

    The activities and projects of the National Library of Medicine are described. New and continuing programs in library services and operations, on-line computer retrieval services, grants for library assistance, audiovisual programs, and health communications research are included. International activities of the Library are outlined. Summary…

  11. Program plan, and request for reprogramming first year funds. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  12. Integrated formal operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

    1994-01-05

    The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

  13. Long-Term Implications of the Fiscal Year 2009 Future Years Defense Program

    National Research Council Canada - National Science Library

    Talaber, Adam; Arthur, David; Bass, Elizabeth; Bennett, Michael; Eveker, Kevin; Frisk, Daniel; Labs, Eric J; Lussier, Frances; Percy, Allison; Hall, Raymond; Newman, David; Regan, Dawn S; Schmit, Matthew; Wheelock, Jason; Kelley, Kate

    2009-01-01

    ...) has published a series of reports about its projections of the resources that might be needed over the long term to carry out the Bush Administration's plans as expressed in the Future Years Defense Program (FYDP...

  14. Sandia National Laboratories California Environmental Monitoring Program Annual Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2006-02-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 Update program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

  15. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  16. Oil Sands Regional Aquatics Monitoring Program (RAMP) 5 year report

    International Nuclear Information System (INIS)

    Fawcett, K.

    2003-05-01

    This 5 year report outlined and examined the activities of the Regional Aquatics Monitoring Program (RAMP) from its introduction in 1997 up to 2001. The RAMP is a multi-stakeholder program comprised of industry and government representatives as well as members of aboriginal groups and environmental organizations. The objectives of RAMP are to monitor aquatic environments in the oil sands region in order to allow for assessment of regional trends and cumulative effects, as well as to provide baseline data against which impact predictions of recent environmental impact assessments can be verified. Scientific programs conducted as part of RAMP during the 5-year period included water quality and sediment quality analyses; fish monitoring; benthic communities monitoring; water quality and aquatic vegetation analyses of wetlands; and hydrology and climate monitoring. RAMP's programs have expanded annually in scope as a result of increased oil sands development in the region. This report provided outlines of RAMP's individual program objectives and organizational structures, as well as details of all studies conducted for each year. Data were collected for all major study areas were presented, and program methodologies for assessing and identifying trends were outlined. refs., tabs., figs

  17. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  18. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  19. The Chooz power station: ten years of operation

    International Nuclear Information System (INIS)

    Teste du Bailler, Andre

    1977-01-01

    The switching into actual service of the Chooz plant, the first pressurized water reactor ever built in France, occurred on 3rd april 1967. Ten years later, one can establish a highly positive balance schedule of plant's operation whose availability is satisfactory, except the mechanical failure which occurred during the startup. The behavior of the equipment, in particular of the components of the primary loop, was satisfactory in its whole since it allowed the gradual increase in capacity by 15% with respect to the initial design. It allowed also the achievment of noticeable progress in the design of equipment intended for the new power stations. Interesting results have also been obtained in radioprotection, working conditions of the staff and environment protection fields. Finally, the training of the operating teams has been closely followed, whether it concerned the operators directly affected by plant operation or the trainees gathered in a school specially organized for this purpose and transferred since to a training Center [fr

  20. EPRI flow-loop/in situ test program for motor-operated valves

    International Nuclear Information System (INIS)

    Hosler, J.F.; Dorfman, L.S.

    1994-01-01

    The Electric Power Research Institute is undertaking a comprehensive research program to develop and validate methods for predicting the performance of common motor-operated gate, global, and butterfly valves. To assess motor-operated valve (MOV) performance characteristics and provide a basis for methods validation, full-scale testing was conducted on 62 MOVs. Tests were performed in four flow-loop facilities and in nine nuclear units. Forty-seven gate, five globe, and 10 butterfly valves were tested under a wide range of flow and differential pressure conditions. The paper describes the test program scope, test configurations, instrumentation and data acquisition, testing approach, and data analysis methods. Key results are summarized

  1. The evolution of an operant ecologist.

    Science.gov (United States)

    Smith, Gerard P

    2002-04-01

    George Collier has maintained a research program concerned with the controls of eating for forty-three years. In the first ten years, Collier approached the problem within the operant conditioning framework proposed by Skinner. This consisted of the intrameal analysis of the reflex strength of a food-rewarded operant in short sessions in food-deprived rats. At the end of the first decade, Collier shifted his attack on the problem by studying the ecological control of meal patterns by procurement and consummatory costs in free-feeding rats. This paper analyzes the reasons for this apparently abrupt evolution from operant conditioning to operant ecology and concludes that they accumulated over about ten years and were intellectual and personal, not technical or professional. This paper also summarizes the major achievements of the research program of operant ecology, notes some emerging problems with economic explanations of ecological controls, and argues that Collier's robust and quantitative behavioral results are ripe for physiological analysis. Copyright 2002 Elsevier Science Ltd.

  2. Design basis programs and improvements in plant operation

    International Nuclear Information System (INIS)

    Metcalf, M.F.

    1991-01-01

    Public Service Electric and Gas (PSE and G) Company operates three commercial nuclear power plants in southern New Jersey. The three plants are of different designs and vintages (two pressurized water reactors licensed in 1976 and 1980 and one boiling water reactor licensed in 1986). As the industry recognized the need to develop design basis programs, PSE and G also realized the need after a voluntary 52-day shutdown of one unit because of electrical design basis problems. In its drive to be a premier electric utility, PSE and G has been aggressively active in developing design basis documents (DBDs) with supporting projects and refined uses to obtain the expected value and see the return on investment. Progress on Salem is nearly 75% complete, while Hope Creek is 20% complete. To data, PSE and G has experienced success in the use of DBDs in areas such as development of plant modifications, development of the reliability-centered maintenance program, procedure upgrades, improved document retrieval, resolution of regulatory issues, and training. The paper examines the design basis development process, supporting projects, and expected improvements in plant operations as a result of these efforts

  3. Site Environmental Report for Calendar Year 2011. DOE Operations at The Boeing Company Santa Susana Field Laboratory, Area IV

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Ning [The Boeing Company, Canoga Park, CA (United States); Rutherford, Phil [The Boeing Company, Canoga Park, CA (United States); Dassler, David [The Boeing Company, Canoga Park, CA (United States)

    2012-09-01

    This Annual Site Environmental Report (ASER) for 2011 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing’s Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, operation and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder reactor components. All nuclear work was terminated in 1988, and all subsequent radiological work has been directed toward environmental restoration and decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Liquid metal research and development ended in 2002. Since May 2007, the D&D operations in Area IV have been suspended by the DOE, but the environmental monitoring and characterization programs have continued. Results of the radiological monitoring program for the calendar year 2011 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  4. Site Environmental Report For Calendar Year 2012. DOE Operations at The Boeing Company Santa Susana Field Laboratory, Area IV

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Ning [The Boeing Company, Canoga Park, CA (United States); Rutherford, Phil [The Boeing Company, Canoga Park, CA (United States); Dassler, David [The Boeing Company, Canoga Park, CA (United States)

    2013-09-01

    This Annual Site Environmental Report (ASER) for 2012 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing’s Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, operation and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder reactor components. All nuclear work was terminated in 1988, and all subsequent radiological work has been directed toward environmental restoration and decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Liquid metal research and development ended in 2002. Since May 2007, the D&D operations in Area IV have been suspended by the DOE, but the environmental monitoring and characterization programs have continued. Results of the radiological monitoring program for the calendar year 2012 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  5. 1957-2007: 50 Years of Higher Order Programming Languages

    Directory of Open Access Journals (Sweden)

    Alen Lovrenčić

    2009-06-01

    Full Text Available Fifty years ago one of the greatest breakthroughs in computer programming and in the history of computers happened -- the appearance of FORTRAN, the first higher-order programming language. From that time until now hundreds of programming languages were invented, different programming paradigms were defined, all with the main goal to make computer programming easier and closer to as many people as possible. Many battles were fought among scientists as well as among developers around concepts of programming, programming languages and paradigms. It can be said that programming paradigms and programming languages were very often a trigger for many changes and improvements in computer science as well as in computer industry. Definitely, computer programming is one of the cornerstones of computer science.Today there are many tools that give a help in the process of programming, but there is still a programming tasks that can be solved only manually. Therefore, programming is still one of the most creative parts of interaction with computers.Programmers should chose programming language in accordance to task they have to solve, but very often, they chose it in accordance to their personal preferences, their beliefs and many other subjective reasons.Nevertheless, the market of programming languages can be merciless to languages as history was merciless to some people, even whole nations. Programming languages and developers get born, live and die leaving more or less tracks and successors, and not always the best survives. The history of programming languages is closely connected to the history of computers and computer science itself. Every single thing from one of them has its reflexions onto the other. This paper gives a short overview of last fifty years of computer programming and computer programming languages, but also gives many ideas that influenced other aspects of computer science. Particularly, programming paradigms are described, their

  6. Crew Factors in Flight Operations X: Alertness Management in Flight Operations

    Science.gov (United States)

    Rosekind, Mark R.; Gander, Philippa H.; Connell, Linda J.; Co, Elizabeth L.

    2001-01-01

    In response to a 1980 congressional request, NASA Ames Research Center initiated a Fatigue/Jet Lag Program to examine fatigue, sleep loss, and circadian disruption in aviation. Research has examined fatigue in a variety of flight environments using a range of measures (from self-report to performance to physiological). In 1991, the program evolved into the Fatigue Countermeasures Program, emphasizing the development and evaluation of strategies to maintain alertness and performance in operational settings. Over the years, the Federal Aviation Administration (FAA) has become a collaborative partner in support of fatigue research and other Program activities. From the inception of the Program, a principal goal was to return the information learned from research and other Program activities to the operational community. The objectives of this Education and Training Module are to explain what has been learned about the physiological mechanisms that underlie fatigue, demonstrate the application of this information in flight operations, and offer some specific fatigue countermeasure recommendations. It is intended for all segments of the aeronautics industry, including pilots, flight attendants, managers, schedulers, safety and policy personnel, maintenance crews, and others involved in an operational environment that challenges human physiological capabilities because of fatigue, sleep loss, and circadian disruption.

  7. NUSTAR - The teenage years. Towards operation at FAIR

    Science.gov (United States)

    Herlert, Alexander

    2017-11-01

    The "NUclear STructure, Astrophysics and Reactions" (NUSTAR) Collaboration was formed at the end of 2003. More than ten years later, a good fraction of the envisaged experimental equipment has been successfully developed and constructed. While the NUSTAR community is looking forward to the start of the civil construction for the new FAIR facility, existing NUSTAR equipment is tested and operated at radioactive ion beam facilities worldwide. The status of the project is briefly described at the stage when it enters the teenage years.

  8. Year-End Clinic Handoffs: A National Survey of Academic Internal Medicine Programs.

    Science.gov (United States)

    Phillips, Erica; Harris, Christina; Lee, Wei Wei; Pincavage, Amber T; Ouchida, Karin; Miller, Rachel K; Chaudhry, Saima; Arora, Vineet M

    2017-06-01

    While there has been increasing emphasis and innovation nationwide in training residents in inpatient handoffs, very little is known about the practice and preparation for year-end clinic handoffs of residency outpatient continuity practices. Thus, the latter remains an identified, yet nationally unaddressed, patient safety concern. The 2014 annual Association of Program Directors in Internal Medicine (APDIM) survey included seven items for assessing the current year-end clinic handoff practices of internal medicine residency programs throughout the country. Nationwide survey. All internal medicine program directors registered with APDIM. Descriptive statistics of programs and tools used to formulate a year-end handoff in the ambulatory setting, methods for evaluating the process, patient safety and quality measures incorporated within the process, and barriers to conducting year-end handoffs. Of the 361 APDIM member programs, 214 (59%) completed the Transitions of Care Year-End Clinic Handoffs section of the survey. Only 34% of respondent programs reported having a year-end ambulatory handoff system, and 4% reported assessing residents for competency in this area. The top three barriers to developing a year-end handoff system were insufficient overlap between graduating and incoming residents, inability to schedule patients with new residents in advance, and time constraints for residents, attendings, and support staff. Most internal medicine programs do not have a year-end clinic handoff system in place. Greater attention to clinic handoffs and resident assessment of this care transition is needed.

  9. Site Environmental Report for Calendar Year 2009. DOE Operations at The Boeing Company Santa Susana Field Laboratory, Area IV

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Ning [The Boeing Company, Canoga Park, CA (United States); Rutherford, Phil [The Boeing Company, Canoga Park, CA (United States); Amar, Ravnesh [The Boeing Company, Canoga Park, CA (United States)

    2010-09-01

    This Annual Site Environmental Report (ASER) for 2009 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing’s Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder reactor components. All nuclear work was terminated in 1988, and all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Liquid metal research and development ended in 2002. Since May 2007, the D&D operations in Area IV have been suspended by the DOE, but the environmental monitoring and characterization programs have continued. Results of the radiological monitoring program for the calendar year 2009 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  10. Site Environmental Report for Calendar Year 2010. DOE Operations at The Boeing Company Santa Susana Field Laboratory, Area IV

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Ning [The Boeing Company, Canoga Park, CA (United States); Rutherford, Phil [The Boeing Company, Canoga Park, CA (United States); Amar, Ravnesh [The Boeing Company, Canoga Park, CA (United States)

    2011-09-01

    This Annual Site Environmental Report (ASER) for 2010 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing’s Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder reactor components. All nuclear work was terminated in 1988, and all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Liquid metal research and development ended in 2002. Since May 2007, the D&D operations in Area IV have been suspended by the DOE, but the environmental monitoring and characterization programs have continued. Results of the radiological monitoring program for the calendar year 2010 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  11. Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    2005-03-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

  12. Modules program structures and the structuring of operating systems

    NARCIS (Netherlands)

    Bron, C.; Duijvestijn, W.; Lockemann, P.C.

    1981-01-01

    In this paper some views are presented on the way in which complex systems, such as Operating Systems and the programs to be interfaced with them can be constructed, and how such systems may become heavily library oriented. Although such systems have a dynamic nature, all interfacing within and

  13. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  14. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  15. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  16. AECB staff review of Bruce NGS'A' operation for the year 1987

    International Nuclear Information System (INIS)

    1988-06-01

    This report presents AECB project staff's review of major licensing issues and of the operational performance of the station during 1987. Ontario Hydro reports and official correspondence and observations on AECB staff at site have been taken into consideration. The report is limited to aspects of the station performance that AECB staff considers to have a safety significance. Where significant developments associated with issues addressed in the report occurred in the early part of 1988 (up to the time of writing), these are mentioned where appropriate. Ontario Hydro's Quarterly Reports for 1987 contain detailed technical information on the performance of the station, individual units and unit systems. It is the opinion of AECB project staff that despite a number of commendable actions and achievements which are identified in this report, the performance of the station in 1987 was only marginally satisfactory and less satisfactory than in 1986. This assessment is supported by key performance indicators such as the number of reportable significant events, the number of events caused by or influenced by human error and the reactor trip frequency, all of which exceeded 1986 levels, and also by the lack of satisfactory progress made during the year on actions to address the findings of the Fall '86 AECB Assessment of Operating Practices. AECB staff considers that the outstanding operations and maintenance problems that were identified in the 1986 Assessment are due, in part, to an ineffective quality assurance program, and in part to a shortage of resources

  17. 31 CFR 103.135 - Anti-money laundering programs for operators of credit card systems.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Anti-money laundering programs for...-Money Laundering Programs Anti-Money Laundering Programs § 103.135 Anti-money laundering programs for.... Virgin Islands. (b) Anti-money laundering program requirement. Effective July 24, 2002, each operator of...

  18. Ten years of German AF-program. Review and outlook at termination of the program

    International Nuclear Information System (INIS)

    Thamm, G.

    1991-01-01

    After a decade of work by industry and national laboratories the German AF-Program will be closed at the end of 1989. The main goal to provide all means required to convert the research reactors in the Federal Republic of Germany has been reached. Conversion concepts meeting the essential criteria worked out by INFCE and all licensing and operating specific data have been elaborated so that the reactors in their present design will be either converted from HEU to LEU operation or closed after consumption of the available HEU material. There will be no future HEU requirements for these reactors. The program work was carried out within 15 major tasks (7 x fuel development and fabrication technology, 4 x fuel qualification, 4 conversion studies) 10 of which were handled by industry. The costs finally amount to 51.5 million German Marks (56% industry). Approximately 43 million German Marks were provided by the Federal Ministry for Research and Technology, the remainder largely was procured by industry. (orig.)

  19. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Boe, Stephen J.; Lofy, Peter T. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2003-03-01

    This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherine Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.

  20. Standard Guide for Radiation Protection Program for Decommissioning Operations

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1987-01-01

    1.1 This guide provides instruction to the individual charged with the responsibility for developing and implementing the radiation protection program for decommissioning operations. 1.2 This guide provides a basis for the user to develop radiation protection program documentation that will support both the radiological engineering and radiation safety aspects of the decommissioning project. 1.3 This guide presents a description of those elements that should be addressed in a specific radiation protection plan for each decommissioning project. The plan would, in turn, form the basis for development of the implementation procedures that execute the intent of the plan. 1.4 This guide applies to the development of radiation protection programs established to control exposures to radiation and radioactive materials associated with the decommissioning of nuclear facilities. The intent of this guide is to supplement existing radiation protection programs as they may pertain to decommissioning workers, members of...

  1. The revised program for measurements in intense operation mode according to AVV-IMIS

    International Nuclear Information System (INIS)

    Bieringer, J.; Wirth, E.; Buehling, A.; Mueller-Neumann, M.; Haase, G.; Heinrich, T.; Steinkopff, T.; Wiezorek, C.

    2007-01-01

    The monitoring program for measurements in intense operation mode has been revised recently by a working group at the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU). The major issues of the revision are reported in this contribution. Measurements in intense operation must be appropriate for fast assessment of the radiological situation, for estimating the dose to the population and for decisions on countermeasures to minimize the dose. In order to meet these requirements the structure of the measurement program in intense operation mode was divided into three phases when different exposition paths are relevant: before and during dispersion of radioactive material, immediately after dispersion of radioactive material has ended and a late phase when contamination values have decreased in different environmental media. For each of these phases a special measurement program was defined that is tailored to achieve the above mentioned objectives. Minimum detectable activity concentrations were introduced similar to the measurement program in routine operation mode. They follow the intervention levels in the catalogue of countermeasures and maximum permitted values given by the European Union (EU) for food and animal feed. The minimum detectable activity concentrations were defined such that the detection of 1/10 of the intervention levels for countermeasures is ensured. (orig.)

  2. Evaluation of a fall-prevention program in older people after femoral neck fracture: a one-year follow-up.

    Science.gov (United States)

    Berggren, M; Stenvall, M; Olofsson, B; Gustafson, Y

    2008-06-01

    A randomized, controlled fall-prevention study including 199 patients operated on for femoral neck fracture reduced inpatient falls and injuries. No statistically significant effects of the intervention program could be detected after discharge. It seems that fall-prevention must be part of everyday life in fall-prone old people. This study evaluates whether a postoperative multidisciplinary, multifactorial fall-prevention program performed by a geriatric team that reduced inpatient falls and injuries had any continuing effect after discharge. The intervention consisted of staff education, systematic assessment and treatment of fall risk factors and vitamin D and calcium supplementation. The randomized, controlled trial with a one-year follow-up at Umeå University Hospital, Sweden, included 199 patients operated on for femoral neck fracture, aged > or = 70 years. After one year 44 participants had fallen 138 times in the intervention group compared with 55 participants and 191 falls in the control group. The crude postoperative fall incidence was 4.16/1,000 days in the intervention group vs. 6.43/1,000 days in the control group. The incidence rate ratio was 0.64 (95% CI: 0.40-1.02, p = 0.063). Seven new fractures occurred in the intervention group and 11 in the control group. A team applying comprehensive geriatric assessment and rehabilitation, including prevention and treatment of fall-risk factors, reduced inpatient falls and injuries, but no statistically significant effects of the program could be detected after discharge. It seems that fall-prevention must be part of everyday life in fall-prone elderly.

  3. The Rendezvous Monitoring Display Capabilities of the Rendezvous and Proximity Operations Program

    Science.gov (United States)

    Brazzel, Jack; Spehar, Pete; Clark, Fred; Foster, Chris; Eldridge, Erin

    2013-01-01

    The Rendezvous and Proximity Operations Program (RPOP) is a laptop computer- based relative navigation tool and piloting aid that was developed during the Space Shuttle program. RPOP displays a graphical representation of the relative motion between the target and chaser vehicles in a rendezvous, proximity operations and capture scenario. After being used in over 60 Shuttle rendezvous missions, some of the RPOP display concepts have become recognized as a minimum standard for cockpit displays for monitoring the rendezvous task. To support International Space Station (ISS) based crews in monitoring incoming visiting vehicles, RPOP has been modified to allow crews to compare the Cygnus visiting vehicle s onboard navigated state to processed range measurements from an ISS-based, crew-operated Hand Held Lidar sensor. This paper will discuss the display concepts of RPOP that have proven useful in performing and monitoring rendezvous and proximity operations.

  4. Fusion Safety Program annual report, fiscal year 1994

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Cadwallader, L.C.; Dolan, T.J.; Herring, J.S.; McCarthy, K.A.; Merrill, B.J.; Motloch, C.G.; Petti, D.A.

    1995-03-01

    This report summarizes the major activities of the Fusion Safety Program in fiscal year 1994. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions, including the University of Wisconsin. The technical areas covered in this report include tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate data base development, and thermalhydraulics code development and their application to fusion safety issues. Much of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and of the technical support for commercial fusion facility conceptual design studies. A major activity this year has been work to develop a DOE Technical Standard for the safety of fusion test facilities

  5. Annual report of operation management in nuclear power stations, fiscal year 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 26 % of electric power supply. As to the capacity factor, 76 % was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported. (Kako, I.)

  6. Human Research Program: 2012 Fiscal Year Annual Report

    Science.gov (United States)

    Effenhauser, Laura

    2012-01-01

    Crew health and performance are critical to successful human exploration beyond low Earth orbit. Risks to health and performance include physiologic effects from radiation, hypogravity, and planetary environments, as well as unique challenges in medical treatment, human factors, and support of behavioral health. The scientists and engineers of the Human Research Program (HRP) investigate and reduce the greatest risks to human health and performance, and provide essential countermeasures and technologies for human space exploration. In its seventh year of operation, the HRP continued to refine its management architecture of evidence, risks, gaps, tasks, and deliverables. Experiments continued on the International Space Station (ISS), on the ground in analog environments that have features similar to those of spaceflight, and in laboratory environments. Data from these experiments furthered the understanding of how the space environment affects the human system. These research results contributed to scientific knowledge and technology developments that address the human health and performance risks. As shown in this report, HRP has made significant progress toward developing medical care and countermeasure systems for space exploration missions which will ultimately reduce risks to crew health and performance.

  7. A model technology transfer program for independent operators

    Energy Technology Data Exchange (ETDEWEB)

    Schoeling, L.G.

    1996-08-01

    In August 1992, the Energy Research Center (ERC) at the University of Kansas was awarded a contract by the US Department of Energy (DOE) to develop a technology transfer regional model. This report describes the development and testing of the Kansas Technology Transfer Model (KTTM) which is to be utilized as a regional model for the development of other technology transfer programs for independent operators throughout oil-producing regions in the US. It describes the linkage of the regional model with a proposed national technology transfer plan, an evaluation technique for improving and assessing the model, and the methodology which makes it adaptable on a regional basis. The report also describes management concepts helpful in managing a technology transfer program.

  8. Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

    Science.gov (United States)

    Hillenius, S.; Marquez, J.; Korth, D.; Rosenbaum, M.; Deliz, Ivy; Kanefsky, Bob; Zheng, Jimin

    2018-01-01

    Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew

  9. Operating years 1993 through 1995 power purchases

    International Nuclear Information System (INIS)

    1991-12-01

    Bonneville Power Administration (BPA) is obligated to supply electric power to its contractual customers. Based on a forecast of growing customer loads and assuming Critical Period water conditions in the Columbia River Basin, BPA is planning to meet a firm energy deficit during the four operating years (OY) 1992 through 1995, i.e., August 1991 through July 1995. BPA has executed several power purchase agreements to cover the projected OY 1992 deficit. The proposed action is to extend two existing one-year power purchase agreements for an additional three years to cover the four-year Critical Period energy deficit. The extension of these two one-year power purchase agreements would: (1) increase BPA's firm energy load-carrying capability; (2) allow BPA to meet its firm energy contractual commitments over the remaining three years of the four-year Critical Period from August 1, 1992, to July 31, 1995; (3) provide flexibility for BPA's use of hydroelectric resources over the Critical Period; and (4) increase system reliability. Under Critical Period water conditions, absent the proposed action, projected loads would exceed the capability of the Federal power system to serve those loads. The purpose of BPA's proposed action is to assure consistency with its statutory responsibilities, including those found in the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act)

  10. Radiological impact of the French nuclear program over the year 1990

    International Nuclear Information System (INIS)

    Maccia, C.; Fagnani, F.

    1980-01-01

    This paper presents a practical assessment of environmental and health impact associated with the normal operation of the different facilities within the French uranium fuel cycle. (Only the PWR's are taken into account.) Fundamentally three objectives are considered in this impact assessment: the environment, the general public and the workers. The French nuclear program projected for 1990 consists in 50 reactors (PWR), distributed on about 24 sites, and is able to satisfy a demand of 304,5 TWh. Concerning each step of the uranium fuel cycle (mine, mill, conversion, enrichment, fuel abrication, reactor, reprocessing and transportation) the following health and physical indicators are used: 1) Liquid and gaseous activities annually released from normal operation of the facility. 2) Individual whole body dose-equivalent at the site boundary. 3) Collective dose equivalent for the general public 20-50 km from the site. 4) Individual and collective occupational radiation exposures. 5) Health effects estimated over the year 1990 by application of the last ICRP's coefficients (Publication No.26). Finally an application of the environmental commitment dose concept is included for the long half-life radionuclides released. (H.K.)

  11. Regional Disparities in Romania. Contribution of the Regional Operational Program to Health Infrastructure

    Directory of Open Access Journals (Sweden)

    VICTOR PLATON

    2013-01-01

    Full Text Available Health infrastructure is one of the weaknesses of socio-economic development in Romania and in other European states. In order to get a better picture of the Romanian health system issues, this paper analyzes a number of statistical indicators considered representative for the national and European health infrastructure for a 20 years period, between 1990 and 2010. Our paper has three main objectives: (a to identify the main trends for health infrastructure in some of the European Union countries; (b to describe the evolution of the health system in Romania, the comparative situation at the European level as well as regional level indicators dynamics; (c to overview the Regional Operational Program in Romania, how much does it help the regional health infrastructure in our country. At the European level, there is a constant decrease in the number of hospital beds. For this indicator, Romania has slightly higher values than the European average. We must mention that the hospital beds indicator offers limited information on health infrastructure which also includes medical equipment and specific devices and practices. The number of hospitals in Romania increased with 18.9% during the last 20 years (1990-2010. During the observed timeline, the number of hospitals in Romania had a constant positive evolution at regional level. The number of doctors in hospitals has an increasing trend at the local as well as at the international level. Romania has a number of doctors twice lower than the European average (3.6 doctors for one thousand inhabitants. The Regional Operational Program (ROP has a limited influence in achieving the objectives stated in Applicants Guide for Priority Axis 3. Major Intervention Area 3.1. This happens because supporting infrastructure improvements will not create institutional modernization. The financial contribution through ROP will result in the modernization of 11% of the existing hospitals in Romania.

  12. Status of the ATLAS Pixel Detector at the LHC and its performance after three years of operation

    CERN Document Server

    Andreazza, A; The ATLAS collaboration

    2012-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC and its status after three years of operation will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: ~96 % of the pixels are operational, noise occupancy and hit ...

  13. The Establishment and Administration of Operant Conditioning Programs in a State Hospital for the Retarded.

    Science.gov (United States)

    Ball, Thomas S., Ed.

    Seven articles treat the establishment of operant conditioning programs for the mentally retarded at Pacific State Hospital in California. Emphasis is on the administrative rather than the demonstration of research aspects of operant conditioning programs. Following an introduction and overview, the medical director's point of view on operant…

  14. Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2

    International Nuclear Information System (INIS)

    Good, D.E.

    1995-09-01

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline

  15. Commercial Nuclear Waste Research and Development Program. Annual report, fiscal year 1984

    International Nuclear Information System (INIS)

    1985-01-01

    This document is a report of fiscal year 1984 activities performed to meet task objectives of the Nevada Nuclear Waste Storage Investigations (NNWSI) Project Plan. Noteworthy accomplishments were: operation of a fuel temperature test which evaluates fuel performance in an environment expected for metal cask storage. This test is being performed for the DOE Richland Operations Dry Storage Fuel Integrity Demonstration Program; characterization of fuel assemblies and storage canisters, which includes fuel assembly visual inspection, videotape and still photography, and contamination swipe sampling; and canister gas and full volume filtration sampling, contamination swipe sampling, and residue collection; removal of fuel assemblies from seal welded storage canisters, using the E-MAD canister cutter; integrity monitoring of fuel assemblies in seal welded canisters, by sampling and analysis of canister cover gas; and fuel assemblies in unwelded canisters, by collection and analysis of fuel surface contamination swipe samples and canister residue; emplacement/removal of canisterized fuel assemblies in the E-MAD drywells; and preparation of a summary storage history of all fuel assemblies at the E-MAD facility, including FY 1983 activities involving those fuel assemblies

  16. Patents Assessed through Sectoral Operational Programs

    Directory of Open Access Journals (Sweden)

    Paula – Angela VIDRAȘCU

    2014-06-01

    Full Text Available According to the International Accounting Standards – IAS 38 „Intangible assets”; these assets are identifiable non-monetary assets under construction were considered without physical substance. Lack actual physical form must not be understood that an intangible asset would have no material support, because the presence of any intangible asset can be demonstrated only by a support material form. Exmple: frequently encounter compact-disc (in case a software, legal documentation (in the case of licences, trade marks and patents of invention, contracts, permits and licences, technical documentation or films. Nowadays we are constantly subjected to the changing flow of information that is found in a perpetual technological change which started the emergence of a new stage in the society development that which carries the name of knowledge. The object of my research is the patent for the structural funds reimbursable project submitted in the "Operational Program, Economic Competitiveness" Operation 2.3.1. "Support for start-ups and innovative spin-offs. Patent is an official document certifying the inventor, the exclusive right to produce a certain good or product or use a particular process. Remember that evaluation of intangible assets is the most complex and systematic procedure.

  17. Facility Operations 1993 fiscal year work plan: WBS 1.3.1

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO{sub 3}) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP).

  18. Facility Operations 1993 fiscal year work plan: WBS 1.3.1

    International Nuclear Information System (INIS)

    1992-11-01

    The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO 3 ) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP)

  19. The Incredible Years Parents and Babies Program:

    DEFF Research Database (Denmark)

    Pontoppidan, Maiken W.; Klest, Sihu; Sandoy, Tróndur Møller

    2016-01-01

    Introduction Infancy is an important period of life; adverse experiences during this stage can have both immediate and lifelong impacts on the child’s mental health and well-being. This study evaluates the effects of the Incredible Years Parents and Babies (IYPB) program as a universal intervention...

  20. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  1. Eat Smart! Ontario's Healthy Restaurant Program: focus groups with non-participating restaurant operators.

    Science.gov (United States)

    Dwyer, John J M; Macaskill, Lesley A; Uetrecht, Connie L; Dombrow, Carol

    2004-01-01

    Eat Smart! Ontario's Healthy Restaurant Program is a standard provincial health promotion program. Public health units give an award of excellence to restaurants that meet nutrition, food safety, and non-smoking seating standards. The purpose of this study was to determine why some restaurant operators have not applied to participate in the program, and how to get them to apply. Four focus group interviews were conducted with 35 operators who didn't apply to participate. The analysis of responses yielded various themes. The participants' perceived barriers to participation were misunderstandings about how to qualify for the program, lack of time, concern about different non-smoking bylaw requirements, and potential loss of revenue. Their perceived facilitators to participation were convenience of applying to participate, franchise executives' approval to participate, a 100% non-smoking bylaw, flexibility in the assessment of restaurants, the opportunity for positive advertising, alternative payment for food handler training, and customer demand. Program staff can use the findings to develop and use strategies to encourage participation.

  2. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  3. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  4. Overview of AEOD's program for trending reactor operational events

    International Nuclear Information System (INIS)

    Baranowsky, P.W.; O'Reilly, P.D.; Rasmuson, D.M.; Houghton, J.R.

    1994-01-01

    This paper presents an overview of the trending program being performed by AEOD. The major elements of the program include: (1) system and component reliability trending and analysis, (2) special data collection and analysis (e.g., IPE and PRA component failure data, common cause failure event data), (3) risk assessment of safety issues based on actual operating experience, (4) Accident Sequence Precursor (ASP) Program, and (5) trending US industry risk. AEOD plans to maintain up-to-date safety data trends for selected high risk or high regulatory profile components, systems, accident initiators, accident sequences, and regulatory issues. AEOD will also make greater use of PRA insights and perform limited probabilistic safety assessments to evaluate the safety significance of qualitative results. Examples of a system study and an issue evaluation are presented, as well as a summary of the common cause failure event database

  5. Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan

    Energy Technology Data Exchange (ETDEWEB)

    Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

    1988-12-01

    This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

  6. Calendar Year 2007 Program Benefits for ENERGY STAR Labeled Products

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, Marla Christine; Homan, Gregory; Brown, Richard

    2008-10-31

    ENERGY STAR is a voluntary energy efficiency-labeling program operated jointly by the United States Department of Energy and the United States Environmental Protection Agency (US EPA). Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products. ENERGY STAR's central role in the development of regional, national, and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with committed stakeholders. Through 2007, the program saved 7.1 Quads of primary energy and avoided 128 MtC equivalent. The forecast shows that the program is expected to save 21.2 Quads of primary energy and avoid 375 MtC equivalent over the period 2008-2015. The sensitivity analysis bounds the best estimate of carbon avoided between 84 MtC and 172 MtC (1993 to 2007) and between 243 MtC and 519 MtC (2008 to 2015).

  7. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Safety Resources About the Patient Education Program The Recovery Room Choosing Wisely Educational Programs Educational Programs Educational ... Lung Operation After Your Operation Your Discharge and Recovery Complete Video After Your Operation Guidance for after ...

  8. An updated radiation protection program prospectus based on 20 years of data describing program drivers and activities.

    Science.gov (United States)

    Emery, Robert J; Gutierrez, Janet M

    2014-08-01

    In 1992, the University of Texas Health Science Center at Houston (UTHSCH) Radiation Safety Program began assembling data on a monthly basis that described various program drivers and associated activities. At the end of calendar year 2002, a decade of data had been collected, so the information was summarized into a novel program prospectus, displaying various program indicator parameters in a format similar to that used in a commercial enterprise prospectus provided to potential investors. The consistent formatting of the data afforded a succinct and easily digestible snapshot of program activities and trends. Feedback from various program stakeholders, even those unfamiliar with radiation safety matters, was overwhelmingly positive. By the end of 2012, a total of 20 years of data had been collected, so an updated and slightly modified prospectus was created. The summary document has helped to describe the drivers of the program, revealed some interesting trends, and has aided in maintaining program support even in challenging economic times. The data summary has also proved to be useful in making future projections regarding program needs.

  9. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  10. Operant Conditioning - Token Economy.

    Science.gov (United States)

    Montgomery, Jacqueline; McBurney, Raymond D.

    Described is an Operant Conditioning-Token Economy Program, teaching patients to be responsible for their own behavior, to make choices, and to be motivated to change. The program was instigated with mentally ill patients in a state hospital and was later used with institutionalized mentally handicapped groups. After two years, only four of the…

  11. A quality assurance program for environmental data operations involving waste management processes

    International Nuclear Information System (INIS)

    Johnson, G.L.; Blacker, S.M.

    1990-01-01

    This paper describes the 'core' elements needed in an effective Quality Program for environmental data operations involving nuclear, mixed, or non-nuclear wastes. For each core element, this paper examines the minimum components needed for an effective Quality Program for EDOs, and compares approaches to Quality Programs currently required by the U.S. DOE and the U.S. EPA. The comparison suggests how the Quality Program requirements used at DOE, and defined by NQA-1 and its supplements, and those used by EPA through its QAMS program guidance, may provide a basis for developing a harmonized Quality Program for EDOs involving any waste management processes, nuclear, non-nuclear, or mixed. (orig./DG)

  12. Building and Deploying Remotely Operated Vehicles in the First-Year Experience

    Science.gov (United States)

    O'Brien-Gayes, A.; Fuss, K.; Gayes, P.

    2007-12-01

    Coastal Carolina University has committed to improving student retention and success in Mathematics and Science through a pilot program to engage first-year students in an applied and investigative project as part of the University's First-Year Experience (FYE). During the fall 2007 semester, five pilot sections of FYE classes, consisting of students from the College of Natural and Applied Sciences are building and deploying Remotely Operated Vehicles (ROVs). These ROV-based classes are designed to: accelerate exploration of the broad fields of science and mathematics; enlist interest in technology by engaging students in a multi-stepped, interdisciplinary problem solving experience; explore science and mathematical concepts; institute experiential learning; and build a culture of active learners to benefit student success across traditional departmental boundaries. Teams of three students (forty teams total) will build, based on the MIT Sea Perch design, and test ROVs in addition to collecting data with their ROVs. Various accessories attached to the vehicles for data collection will include temperature and light sensors, plankton nets and underwater cameras. The first-year students will then analyze the data, and the results will be documented as part of their capstone projects. Additionally, two launch days will take place on two campus ponds. Local middle and high school teachers and their students will be invited to observe this event. The teams of students with the most capable and successful ROVs will participate in a workshop held in November 2007 for regional elementary, middle and high school teachers. These students will give a presentation on the building of the ROVs and also provide a hands-on demonstration for the workshop participants. These activities will ensure an incorporation of service learning into the first semester of the freshmen experience. The desired outcomes of the ROV-based FYE classes are: increased retention at the postsecondary

  13. A program for performing angular integrations for transition operators

    International Nuclear Information System (INIS)

    Froese Fischer, C.; Godefroid, M.R.; Hibbert, A.

    1991-01-01

    The MCHF-MLTPOL program performs the angular integrations necessary for expressing the matrix elements of transition operators, E1, E2, ..., or M1, M2, ..., as linear combinations of radial integrals. All matrix elements for transitions between two lists of configuration states will be evaluated. A limited amount of non-orthogonality is allowed between orbitals of the initial and final state. (orig.)

  14. Research and examinations at the Tono Mines. Fiscal year's programs (Heisei 12 fiscal year). Technical report

    International Nuclear Information System (INIS)

    2000-04-01

    This program showed details on the research and examination program of the Japan Nuclear Cycle Development Institute to be carried out at the Tono Mines in the Heisei 12 fiscal year, according to the 'Fundamental program on research and examinations at the Tono Mines' established on October, 1998. And, this program is carried out under an aim at understanding of transfer and delay performance of materials in deposit rocks with uranium and geological features such as fault, and at development of technology and apparatus for general investigation and evaluation of geological environment, as a stratum science research. Here were described on research and examination of mechanical stability on the rock board, research and examination of geological environment around a tunnel, research and examination of material transfer in the rock board, and research and examination of the Tsukiyoshi stratum abstractly before 1999 and in details at 2000 fiscal years. (G.K.)

  15. Fusion Safety Program annual report, fiscal year 1985

    International Nuclear Information System (INIS)

    Holland, D.F.; Merrill, B.J.; Herring, J.S.; Piet, S.J.; Longhurst, G.R.

    1987-02-01

    The Fusion Safety Program (FSP) has supported magnetic fusion technology for seven years, and this is the seventh annual report issued by the FSP. Program focus is identification of the magnitude and distribution of radioactive inventories in fusion reactors, and research and analysis of postulated accident scenarios that could cause the release of a portion of these inventories. Research results are used to develop improved designs that can reduce the probability and magnitude of such releases and thus improve the overall safety of fusion reactors. During FY-1985, research activities continued and participation continued on the Ignition Systems Project (ISP). This report presents the significant results of EGandG Idaho, Inc., activities and those from outside contracts, and includes a list of publications produced during the year, and activities planned for FY-1986

  16. Operating experience with snubbers

    International Nuclear Information System (INIS)

    Levin, H.; Cudlin, R.

    1978-06-01

    Recent operating experience with hydraulic and mechanical snubbers has indicated that there is a need to evaluate current practice in the industry associated with snubber qualification testing programs, design and analysis procedures, selection and specification criteria, and the preservice inspection and inservice surveillance programs. The report provides a summary of operational experiences that represent problems that are generic throughout the industry. Generic Task A-13 is part of the NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants described in NUREG-0410. The report is based upon a rather large amount of data that have become available in the past four years. These data have been evaluated by the Division of Operating Reactors to develop a data base for use in connection with several NRC activities including Category A, Technical Activity A-13 (Snubbers); the Standard Review Plan; future Regulatory Guides; ASME Code Provisions; and various technical specifications of operating nuclear power plants

  17. Ecological Monitoring and Compliance Program Fiscal Year 2003 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    2003-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

  18. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  19. Research and development program, fiscal year 1974

    Energy Technology Data Exchange (ETDEWEB)

    1972-04-01

    The biomedical program of the Laboratory of Nuclear Medicine and Radiation Biology for Fiscal Year 1974 is conducted within the scope of the following categories: Effects of Radiation of Living Organisms; Molecular and Cellular Radiobiology; Land and Fresh Water Environmental Sciences; Radiological and Health Physics and Instrumentation; and Nuclear Medical Research. (ACR)

  20. Radar-based alert system to operate a sewerage network: relevance and operational effectiveness after several years of use.

    Science.gov (United States)

    Faure, D; Payrastre, O; Auchet, P

    2005-01-01

    Since January 2000, the sewerage network of a very urbanised catchment area in the Greater Nancy Urban Community has been operated according to the alarms generated in real time by a storm alert system using weather radar data. This alert system is based on an automatic identification of intense rain cells in the radar images. This paper presents the characteristics of this alert system and synthesises the main results of two complementary studies realised in 2002 in order to estimate the relevance and the operational effectiveness of the alert system. The first study consisted in an off-line analysis of almost 50,000 intense rain cells detected in four years of historical radar data. The second study was an analysis of the experience feedback after two years of operational use of this alert system. The results of these studies are discussed in function of the initial operational objectives.

  1. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  2. Performance of the ATLAS Liquid Argon Calorimeter after three years of LHC operation and plans for a future upgrade

    International Nuclear Information System (INIS)

    Nikiforou, Nikiforos

    2013-06-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider (LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry as well as hadronic calorimetry in the end-caps. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic rays and single LHC beams. Since then, approximately 27 fb -1 of data have been collected at an unprecedented center of mass energy. During all these stages, the calorimeter and its electronics have been operating almost optimally, with a performance very close to specifications. This paper covers all aspects of these first years of operation. The excellent performance achieved is especially presented in the context of the discovery of the elusive Higgs boson. The future plans to preserve this performance until the end of the LHC program are also presented. (authors)

  3. Light Water Reactor Sustainability Program: Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-02-15

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy's 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear

  4. Light Water Reactor Sustainability Program: Integrated Program Plan

    International Nuclear Information System (INIS)

    2016-02-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy's 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation

  5. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  6. Process hazards analysis (PrHA) program, bridging accident analyses and operational safety

    International Nuclear Information System (INIS)

    Richardson, J.A.; McKernan, S.A.; Vigil, M.J.

    2003-01-01

    Recently the Final Safety Analysis Report (FSAR) for the Plutonium Facility at Los Alamos National Laboratory, Technical Area 55 (TA-55) was revised and submitted to the US. Department of Energy (DOE). As a part of this effort, over seventy Process Hazards Analyses (PrHAs) were written and/or revised over the six years prior to the FSAR revision. TA-55 is a research, development, and production nuclear facility that primarily supports US. defense and space programs. Nuclear fuels and material research; material recovery, refining and analyses; and the casting, machining and fabrication of plutonium components are some of the activities conducted at TA-35. These operations involve a wide variety of industrial, chemical and nuclear hazards. Operational personnel along with safety analysts work as a team to prepare the PrHA. PrHAs describe the process; identi fy the hazards; and analyze hazards including determining hazard scenarios, their likelihood, and consequences. In addition, the interaction of the process to facility systems, structures and operational specific protective features are part of the PrHA. This information is rolled-up to determine bounding accidents and mitigating systems and structures. Further detailed accident analysis is performed for the bounding accidents and included in the FSAR. The FSAR is part of the Documented Safety Analysis (DSA) that defines the safety envelope for all facility operations in order to protect the worker, the public, and the environment. The DSA is in compliance with the US. Code of Federal Regulations, 10 CFR 830, Nuclear Safety Management and is approved by DOE. The DSA sets forth the bounding conditions necessary for the safe operation for the facility and is essentially a 'license to operate.' Safely of day-to-day operations is based on Hazard Control Plans (HCPs). Hazards are initially identified in the PrI-IA for the specific operation and act as input to the HCP. Specific protective features important to worker

  7. A Three-Year Reflective Writing Program as Part of Introductory Pharmacy Practice Experiences

    Science.gov (United States)

    Vaughn, Jessica; Kerr, Kevin; Zielenski, Christopher; Toppel, Brianna; Johnson, Lauren; McCauley, Patrina; Turner, Christopher J.

    2013-01-01

    Objectives. To implement and evaluate a 3-year reflective writing program incorporated into introductory pharmacy practice experiences (IPPEs) in the first- through third-year of a doctor of pharmacy (PharmD) program. Design. Reflective writing was integrated into 6 IPPE courses to develop students’ lifelong learning skills. In their writing, students were required to self-assess their performance in patient care activities, identify and describe how they would incorporate learning opportunities, and then evaluate their progress. Practitioners, faculty members, and fourth-year PharmD students served as writing preceptors. Assessment. The success of the writing program was assessed by reviewing class performance and surveying writing preceptor’s opinions regarding the student’s achievement of program objectives. Class pass rates averaged greater than 99% over the 8 years of the program and the large majority of the writing preceptors reported that student learning objectives were met. A support pool of 99 writing preceptors was created. Conclusions. A 3-year reflective writing program improved pharmacy students’ reflection and reflective writing skills. PMID:23788811

  8. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  9. Operations Management in the Design and Execution of MBA Programs

    Science.gov (United States)

    Busing, Michael E.; Palocsay, Susan W.

    2016-01-01

    Master of business administration (MBA) programs are under intense pressure to improve efficiencies, lower tuition, and offer refreshed curriculum that is of high quality and regarded as relevant by the marketplace. In light of this environment, the authors propose a conceptual framework for effectively employing operations management (OM)…

  10. 46 CFR 71.50-27 - Alternative Hull Examination (AHE) program options: Divers or underwater remotely operated...

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Alternative Hull Examination (AHE) program options...-27 Alternative Hull Examination (AHE) program options: Divers or underwater remotely operated vehicle... operations; (2) Provide permanent hull markings, a temporary grid system of wires or cables spaced not more...

  11. A Descriptive Study of Wisconsin PK-12 Virtual Public School Program Operations and Management

    Science.gov (United States)

    Banker, Margaret M.

    2012-01-01

    E-Learning as it pertains to public education is in its infancy in America. There is limited research on what operational design, development, and management attributes of virtual school programs foster student achievement. The Wisconsin Department of Instruction has not developed or adopted program standards for E-Learning programs. The purpose…

  12. Energy extension service pilot program evaluation report: the first year. Volume II: pilot state reports

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    Volume II of the Energy Extension Service Evaluation presents a discussion of the operations of the ten EES pilot-state programs during the period from October 1, 1977 through September 30, 1978. Each of the ten pilot states - Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming - received a grant of approximately $1.1 million to develop and implement a 19-month program beginning on October 1, 1977. Volume II provides a case-study description of the operations of the pilot program in each state, with special attention given to the two programs selected in each state for more detailed study and survey research. Some survey data and analysis are presented for the emphasis programs.

  13. EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS

    Science.gov (United States)

    The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...

  14. Obedience to compliance programs and independence for electricity and natural gas system operators. 2009 report

    International Nuclear Information System (INIS)

    2009-12-01

    In France, system operators belong to groups that also conduct business in the energy sector, in fields governed by competition rules. They could therefore be tempted to use their privileged position to their group's benefit, which would disadvantage end consumers. Non-discriminatory access to electricity and gas transmission and distribution networks is at the core of the market opening to competition approach implemented by the European Union since the end of the 1990's. EU and national enactments in force highlight two tools to ensure nondiscrimination: compliance programmes and independence of system operators with regard to their parent companies. Firstly, compliance programs contain measures taken to ensure that discrimination is completely excluded and that their application is subject to appropriate monitoring. Secondly, system operator independence plays a part in preventing discrimination against competitors with other business activities (generation, supply, etc.) within the same group. In application of these enactments, every electricity or natural gas transmission or distribution system operator serving more than 100,000 customers provided CRE, the Energy Regulatory Commission, with their annual reports on the application of their compliance programs. This document is CRE's 2009 report about compliance programmes and independence of electricity and natural gas system operators. Its content can be summarized as follows: 1 - system operator independence serving consumers: Non-discriminatory access to networks is essential for the development of competitive markets, System operator compliance programs and independence act as a guarantee of nondiscrimination, The legal context in which these issues are addressed is set to change in the near future; 2 - A high level of obedience to compliance programs: The continued efforts of system operators prevent discrimination, CR E has assessed distribution system operators by means of a mystery

  15. Status and progress of the RERTR program in the year 2002

    International Nuclear Information System (INIS)

    Travelli, A.; Technology Development

    2003-01-01

    Following the cancellation of the 2001 International RERTR Meeting, which had been planned to occur in Bali, Indonesia, this paper describes the progress achieved by the Reduced Enrichment for Research and Test Reactors (RERTR) Program in collaboration with its many international partners during the years 2001 and 2002, and discusses the main activities planned for the year 2003. The past two years have been characterized by very important achievements of the RERTR program, but these technical achievements have been overshadowed by the terrible events of September 11, 2001. Those events have caused the U.S. Government to reevaluate the importance and urgency of the RERTR program goals. A recommendation made at the highest levels of the government calls for an immediate acceleration of the program activities, with the goal of converting all the world's research reactors to low-enriched fuel at the earliest possible time, and including both Soviet-designed and United States-designed research reactors

  16. FCFPYRO simulation of the first year FCF hot operation plan

    International Nuclear Information System (INIS)

    Liaw, J.R.; Li, S.X.; Benedict, R.W.

    1996-01-01

    A simulation study has been successfully completed according to the first year FCF operational plan for the treatment of EBR-II spent fuels. Material flow by nuclides for each processing step and radioactive decays during the process are considered. The FCFPYRO code package is a very useful tool to provide step-by-step information essential to the analysis of operational strategy, process chemistry, heat removal, criticality safety, and radiological health issues in FCF

  17. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    International Nuclear Information System (INIS)

    Bissani, M; O'Kelly, D S

    2006-01-01

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to provide color-enhanced gemstones but is

  18. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bissani, M; O' Kelly, D S

    2006-05-08

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to

  19. Twenty years of the national program of surveillance radiation of the atmosphere and terrestrial environment; Veinte anos del programa nacional de vigilancia radiologica de la atmosfera y medio terrestre

    Energy Technology Data Exchange (ETDEWEB)

    Rey del Castillo, C.; Luque Heredia, S.; Marugan Tovar, I.; Salas Collantes, R.; Serling Carmona, A.; Lorente Lorente, P.; Ramos Salvador, L.

    2013-07-01

    This paper presents a global basis the information provided by the program in twenty years of operation, describing the main changes introduced and analyzing how they have influenced the results. The use of program data to inform and in response to questions from individuals or incidents is reviewed. And finally the prospects and major milestones expected to address in the next twenty years are described. (Author)

  20. Nuclear test-experimental science annual report, Fiscal year 1990

    International Nuclear Information System (INIS)

    Struble, G.L.; Middleton, C.; Anderson, S.E.; Cherniak, J.; Donohue, M.L.; Francke, A.; Hedman, I.; Kirvel, R.D.

    1991-01-01

    Fiscal year 1990 was another year of outstanding accomplishments for the Nuclear Test-Experimental Science (NTES) Program at Lawrence Livermore National Laboratory (LLNL). We continued to make progress to enhance the experimental science in the Weapons Program and to improve the operational efficiency and productivity of the Nuclear Test Program

  1. The Dark Energy Survey and Operations: Years 1 to 3

    Energy Technology Data Exchange (ETDEWEB)

    Diehl, H. T. [Fermilab

    2016-01-01

    The Dark Energy Survey (DES) is an operating optical survey aimed at understanding the accelerating expansion of the universe using four complementary methods: weak gravitational lensing, galaxy cluster counts, baryon acoustic oscillations, and Type Ia supernovae. To perform the 5000 sq-degree wide field and 30 sq-degree supernova surveys, the DES Collaboration built the Dark Energy Camera (DECam), a 3 square-degree, 570-Megapixel CCD camera that was installed at the prime focus of the Blanco 4-meter telescope at the Cerro Tololo Inter-American Observatory (CTIO). DES has completed its third observing season out of a nominal five. This paper describes DES “Year 1” (Y1) to “Year 3” (Y3), the strategy, an outline of the survey operations procedures, the efficiency of operations and the causes of lost observing time. It provides details about the quality of the first three season's data, and describes how we are adjusting the survey strategy in the face of the El Niño Southern Oscillation

  2. The BR2 refurbishment programme: achievements and two years operation feedback

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Koonen, E.; Van der Auwera, J.

    1999-01-01

    The BR2 reactor was shutdown end of June 1995 for an extensive refurbishment after more than 30 years utilization. The beryllium matrix needed to be replaced and the aluminium vessel inspected for an envisaged 15 year life extension. Other aspects of the refurbishment programme aimed at the reliability and availability of the installations, safety of operation and compliance with modern safety standards. The reactor was started again in' April '97 and operated only for three cycles in 1997. These first irradiation cycles were intended as a demonstration of the safety and reliability of all components and systems after refurbishment. Also during the extended shutdowns non-critical refurbishment tasks were allowed to be continued and finalized. At the request of the Safety Authorities, some modifications and studies are still in progress without perturbation of the reactor operation. (author)

  3. The Westinghouse Hanford Company Operational Environmental Monitoring Program CY-93

    International Nuclear Information System (INIS)

    Schmidt, J.W.

    1993-10-01

    The Operational Environmental Monitoring Program (OEMP) provides facility-specific environmental monitoring to protect the environment adjacent to facilities under the responsibility of Westinghouse Hanford Company (WHC) and assure compliance with WHC requirements and local, state, and federal environmental regulations. The objectives of the OEMP are to evaluate: compliance with federal (DOE, EPA), state, and internal WHC environmental radiation protection requirements and guides; performance of radioactive waste confinement systems; and trends of radioactive materials in the environment at and adjacent to nuclear facilities and waste disposal sites. This paper identifies the monitoring responsibilities and current program status for each area of responsibility

  4. The Component Operational Experience Degradation and Ageing Program (CODAP). Review and lessons learned (2011-2014)

    International Nuclear Information System (INIS)

    Dragea, Tudor; Riznic, Jovica R.

    2015-01-01

    The structural integrity of piping systems is crucial to continuous and safe operation of nuclear power plants. Across all designs, the pressure boundary and its related piping and components, form one of the many levels of defense in the continuous and safe operation of a nuclear power plant. It is therefore necessary to identify, understand, evaluate and catalogue all of the various degradation mechanisms and failures that affect various piping systems and components across all nuclear power plants (NPP's). This need was first recognized in 1994 by the Swedish Nuclear Power Inspectorate (SKI) which launched a five-year Research and Development (R and D) project to explore the viability of creating an international pipe failure database (SKI-PIPE) (Riznic, 2007). The project was considered to be very successful and in 2002, the Organization for Economic Co-operation and Development (OECD) Pipe Failure Data Exchange (OPDE) was created. OPDE was operated under the umbrella of the OECD Nuclear Energy Agency (NEA) and was created in order to produce an international database on the piping service experience applicable to commercial nuclear power plants. After the successful completion of OPDE, the OECD, as well as other international members, agreed to participate in OPDE's successor: the Component Operational Experience Degradation and Ageing Program (CODAP). The objective of CODAP is to collect information on all possible events related to the failure and degradation of passive metallic components in NPP's. With CODAP winding down to the completion of its first phase in December 2014, this report will focus on the conclusions and the lessons learned throughout the many years of CODAP's implementation. There are currently 14 countries participating in CODAP, many of whom are industry leaders (France, Canada, U.S.A., Germany, Japan, Korea etc.). This cooperation on an international scale provides a library of OPerational EXperience (OPEX) for all participating NPP

  5. Graduating general surgery resident operative confidence: perspective from a national survey.

    Science.gov (United States)

    Fonseca, Annabelle L; Reddy, Vikram; Longo, Walter E; Gusberg, Richard J

    2014-08-01

    General surgical training has changed significantly over the last decade with work hour restrictions, increasing subspecialization, the expanding use of minimally invasive techniques, and nonoperative management for solid organ trauma. Given these changes, this study was undertaken to assess the confidence of graduating general surgery residents in performing open surgical operations and to determine factors associated with increased confidence. A survey was developed and sent to general surgery residents nationally. We queried them regarding demographics and program characteristics, asked them to rate their confidence (rated 1-5 on a Likert scale) in performing open surgical procedures and compared those who indicated confidence with those who did not. We received 653 responses from the fifth year (postgraduate year 5) surgical residents: 69% male, 68% from university programs, and 51% from programs affiliated with a Veterans Affairs hospital; 22% from small programs, 34% from medium programs, and 44% from large programs. Anticipated postresidency operative confidence was 72%. More than 25% of residents reported a lack of confidence in performing eight of the 13 operations they were queried about. Training at a university program, a large program, dedicated research years, future fellowship plans, and training at a program that performed a large percentage of operations laparoscopically was associated with decreased confidence in performing a number of open surgical procedures. Increased surgical volume was associated with increased operative confidence. Confidence in performing open surgery also varied regionally. Graduating surgical residents indicated a significant lack of confidence in performing a variety of open surgical procedures. This decreased confidence was associated with age, operative volume as well as type, and location of training program. Analyzing and addressing this confidence deficit merits further study. Copyright © 2014 Elsevier Inc. All

  6. Continued advancement of the programming language HAL to an operational status

    Science.gov (United States)

    1971-01-01

    The continued advancement of the programming language HAL to operational status is reported. It is demonstrated that the compiler itself can be written in HAL. A HAL-in-HAL experiment proves conclusively that HAL can be used successfully as a compiler implementation tool.

  7. Experimental RA reactor operation with 80% enriched fuel - Program of experimental operation: a) Program of experimental operation with 80% enriched fuel at low power, b) contents of the experimental operation with 80% enriched fuel at higher power levels; Program probnog rada: a) Program probnog rada reaktora sa 80% obogacenim gorivom na malim snagama, b) sadrzaj programa probnog rada reaktora RA sa 80% obogacenim gorivom na vecim snagama

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Sotic, O; Skoric, M; Cupac, S; Bulovic, V; Maric, I; Marinkov, L [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-10-15

    Highly enriched (80%) uranium oxide fuel was regularly used in the mixed reactor core with the 2% enriched fuel since 1976. The most important changes related to reactor operation, in comparison with the original design project were related to reactor core fuelling schemes. At the end of 1979 reactor was shutdown due to the corrosion coating noticed on some fuel elements and due to decrease quality of the heavy water. Subsequently the Sanitary inspector of Serbia has prohibited further reactor operation. Restart of the reactor will not be a simple continuation of operation. It is indispensable to perform complete experimental program including measurements of critical parameters at different power levels for the core with fresh 80% enriched fuel. The aim of this document is to obtain working permission and its contents are in agreement with the procedure demanded by the Safety Committee of the Institute. It includes results of optimization and safety analysis for the initial reactor core. Since the permission for restart is not obtained, a separate RA reactor safety report is prepared in addition to the program for experimental operation. This report includes: detailed program for reactor experimental operation with 80% enriched fuel in the core at low power levels, and contents of the experimental operation with 80% enriched fuel in the core at higher power levels. [Serbo-Croat] Od decembra 1976. godine redovno je korisceno 80% obogaceno gorivo u mesanoj resetki reaktorskog jezgra sa 2% obogacenim gorivom. Najvece izmene na reaktoru u odnosu na originalni projekat izvrsene su u nacinu rukovanja gorivom. Krajem marta 1979. godine obustavljen je rad reaktora usled naslaga na gorivnim elementima i loseg stanja teske vode. Naknadno je izdata zabrana za rad reaktora od strane Sanitarnog inspektora SR Srbije. Ponovno pustanje reaktora u rad nece biti jednostavan nastavak rada. Neophodno je da se izvede kompletan program merenja kriticnih parametara i drugih

  8. Solar Program Overview: Fiscal Years 2002& 2003 (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2004-06-01

    This document describes the research activities and accomplishments of the DOE Solar Energy Technologies Program for fiscal years 2002 and 2003. It includes detailed accounts, charts, and photos of R&D activities in the areas of photovoltaics, concentrating solar power, and solar heating and lighting

  9. An intervention to improve program implementation: findings from a two-year cluster randomized trial of Assets-Getting To Outcomes

    Science.gov (United States)

    2013-01-01

    Background Studies have shown that communities have not always been able to implement evidence-based prevention programs with quality and achieve outcomes demonstrated by prevention science. Implementation support interventions are needed to bridge this gap between science and practice. The purpose of this article is to present two-year outcomes from an evaluation of the Assets Getting To Outcomes (AGTO) intervention in 12 Maine communities engaged in promoting Developmental Assets, a positive youth development approach to prevention. AGTO is an implementation support intervention that consists of: a manual of text and tools; face-to-face training, and onsite technical assistance, focused on activities shown to be associated with obtaining positive results across any prevention program. Methods This study uses a nested and cross-sectional, cluster randomized controlled design. Participants were coalition members and program staff from 12 communities in Maine. Each coalition nominated up to five prevention programs to participate. At random, six coalitions and their respective 30 programs received the two-year AGTO intervention and the other six maintained routine operations. The study assessed prevention practitioner capacity (efficacy and behaviors), practitioner exposure to and use of AGTO, practitioner perceptions of AGTO, and prevention program performance. Capacity of coalition members and performance of their programs were compared between the two groups across the baseline, one-, and two-year time points. Results We found no significant differences between AGTO and control group’s prevention capacity. However, within the AGTO group, significant differences were found between those with greater exposure to and use of AGTO. Programs that received the highest number of technical assistance hours showed the most program improvement. Conclusions This study is the first of its kind to show that use of an implementation support intervention-AGTO -yielded

  10. Influence of year-on-year performance on final degree classification in a chiropractic master's degree program.

    Science.gov (United States)

    Dewhurst, Philip; Rix, Jacqueline; Newell, David

    2016-03-01

    We explored if any predictors of success could be identified from end-of-year grades in a chiropractic master's program and whether these grades could predict final-year grade performance and year-on-year performance. End-of-year average grades and module grades for a single cohort of students covering all academic results for years 1-4 of the 2013 graduating class were used for this analysis. Analysis consisted of within-year correlations of module grades with end-of-year average grades, linear regression models for continuous data, and logistic regression models for predicting final degree classifications. In year 1, 140 students were enrolled; 85.7% of students completed the program 4 years later. End-of-year average grades for years 1-3 were correlated (Pearson r values ranging from .75 to .87), but the end-of-year grades for years 1-3 were poorly correlated with clinic internship performance. In linear regression, several modules were predictive of end-of-year average grades for each year. For year 1, logistic regression showed that the modules Physiology and Pharmacology and Investigative Imaging were predictive of year 1 performance (odds ratio [OR] = 1.15 and 0.9, respectively). In year 3, the modules Anatomy and Histopathology 3 and Problem Solving were predictors of the difference between a pass/merit or distinction final degree classification (OR = 1.06 and 1.12, respectively). Early academic performance is weakly correlated with final-year clinic internship performance. The modules of Anatomy and Histopathology year 3 and Problem Solving year 3 emerged more consistently than other modules as being associated with final-year classifications.

  11. 76 FR 26805 - Medicare Program; Hospice Wage Index for Fiscal Year 2012

    Science.gov (United States)

    2011-05-09

    ..., and hospices in low-wage index areas are unfairly advantaged. The commenter felt that our not wage... Medicare & Medicaid Services 42 CFR Part 418 Medicare Program; Hospice Wage Index for Fiscal Year 2012... [CMS-1355-P] RIN 0938-AQ31 Medicare Program; Hospice Wage Index for Fiscal Year 2012 AGENCY: Centers...

  12. Impact after three years of the Swedish energy audit program

    International Nuclear Information System (INIS)

    Backlund, Sandra; Thollander, Patrik

    2015-01-01

    The Swedish energy audit program is a publicly financed program, mainly targeting small and medium-sized firms to help them finance energy audits. By examining suggested and implemented energy efficiency measures from the energy audits conducted in 241 firms in the program, the aim of this paper is to examine the energy efficiency implementation gap and the cost efficiency of the program. The audits show that the firms' average annual energy efficiency improvement potential is between 860 and 1270 MWh/year which corresponds to a total energy efficiency improvement potential of between 6980 and 11,130 MWh/firm. The implementation rate of the suggested energy efficiency improvement measures in the SEAP is 53%. The program has resulted in investments in energy efficiency improvements between €74,100and €113,000/firm. - Highlights: • Auditors find an energy efficiency improvement potential of 460–660 MWh/year/firm. • The implementation rate of the suggested measures is 53%. • The total cost per MWh lie between €87 and €114/MWh. • Public costs in the SEAP are €0.7–€1.3/MWh

  13. Science Teacher Leadership: Learning from a Three-Year Leadership Program

    Science.gov (United States)

    Luft, Julie A.; Dubois, Shannon L.; Kaufmann, Janey; Plank, Larry

    2016-01-01

    Teachers are professional learners and leaders. They seek to understand how their students learn, and they participate in programs that provide new instructional skills, curricular materials, and ways to become involved in their community. This study follows a science teacher leadership program over a three-year period of time. There were…

  14. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  15. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  16. Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program

    Science.gov (United States)

    Selwitz, Jason Lawrence

    Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum and course development and evaluation research. First, the context of, and impetus for, what was formerly called vocational education, now referred to as technical or workforce education, is provided. Second, the research that was undertaken to design and evaluate an associate degree-level STEM workforce education program is described. Third, the adaptation of a student self-assessment of learning gains instrument is reviewed, and an analysis of the resulting data using an adapted logic model is provided, to evaluate the extent to which instructional approaches, in two process control/improvement-focused courses, were effective in meeting course-level intended learning outcomes. Finally, eight integrative multiscale exercises were designed from two example process systems, wastewater treatment and fast pyrolysis. The integrative exercises are intended for use as tools to accelerate the formation of an operator-technician's multiscale vision of systems, unit operations, underlying processes, and fundamental reactions relevant to multiple industries. Community and technical colleges serve a vital function in STEM education by training workers for medium- and high-skilled technical careers and providing employers the labor necessary to operate and maintain thriving business ventures. Through development of the curricular, course, and assessment-related instruments and tools, this research helps ensure associate degree-level technical education programs can engage in a continual process of program evaluation and improvement.

  17. 30 years of ergonomics at 3M: a case study.

    Science.gov (United States)

    Larson, N; Wick, H

    2012-01-01

    The added value of the Ergonomics Program at 3M was found to be improved employee safety, compliance with regulations and reduction of work-related illness, increases in productivity, and quality and operating efficiency. This paper describes the thirty years of existence of this program. For the first twenty years, the program objectives were to: respond to requests for assistance related to work-related musculoskeletal disorder (WMSD) concerns, raise employee awareness of MSDs and ergonomics; educate engineers in ergonomics design; and develop ergonomics teams at manufacturing locations. Since the year 2000, 3M's Ergonomics Program has been in transition from a US-centric and corporate-based technical-expertled program to a global program applying participatory ergonomics strategies within a macroergonomics framework. During that transition, the existing program requirements were revised, new methods and program tools were created, and expectations for implementation at the manufacturing locations clarified. This paper focuses on the company's manufacturing ergonomics program activities during the past ten years and includes specifics of the program's objectives, risk assessment reduction process, and ergonomics technical expertise development. The main benefit achieved throughout the company is reducing employee injury while also increasing productivity and operating efficiency.

  18. Horonobe Underground Research Laboratory project. Investigation program for the 2008 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sanada, Hiroyuki; Yamaguchi, Takehiro; Sugita, Yutaka

    2008-09-01

    As part of the research and development program on geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the Midterm Plan of JAEA, geological investigations are to be carried out during the drilling of a shaft down to intermediate depth, while research and development in the areas of engineering technology and safety assessment are to be promoted by collaboration with other research organizations. The results of the R and D activities will be systematized as a 'knowledge base' that supports a wide range of arguments related to the safety of geological disposal. The Horonobe URL Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the investigation program for the 2008 fiscal year (2008/2009), the 4th year of the Phase 2 investigations. In the 2008 fiscal year, investigations in geoscientific research', including 'development of techniques for investigating the geological environment', 'development of techniques for long-term monitoring of the geological environment', 'development of engineering techniques for use in the deep underground environment' and studies on the long-term stability of the geological environment', are continuously carried out. Investigations in 'research and development on geological disposal technology', including 'improving the reliability of disposal technologies' and 'enhancement of safety assessment methodologies', are also continuously carried out

  19. The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963

    International Nuclear Information System (INIS)

    Fontaine, A.

    1964-01-01

    In this paper, the author attempts to sum up the conditions prevailing, after six years of operation, in the Laboratories of the Plutonium Extraction Plant. The origins and objectives are briefly reviewed, the technology and staff recruitment policy are examined, and progress made is shown. The methods used as well as the scope of application and limits imposed at the present state are considered. Past achievements and further possibilities in the next future are examined. An attempt has been made to bring out the outlooks for the more distant future and to investigate the conditions required for the successful carrying out of the program. (author) [fr

  20. Computer programs at SRL to evaluate environmental effects SRP operations and postulated accidental releases

    International Nuclear Information System (INIS)

    Cooper, R.E.

    1975-09-01

    Savannah River Plant operations unavoidably result in the release of some chemical and radioactive effluents to the environs. The most environmentally significant releases are gaseous effluents to the atmosphere; computer codes dealing with these atmospheric releases are discussed in this report. There is a wide variety of effluents, both chemical and radioactive, to be considered, and each must be correlated with meteorological dispersion data as a function of time to estimate the environmental effects. In addition, large inventories of toxic and radioactive materials in some facilities represent a potential for accidental releases. Accidents are postulated for these facilities, and the environmental effects of resulting releases are again evaluated by correlating with meteorological dispersion data. In accordance with AEC Regulatory Guide 23, a 2-year meteorological data base is used in performing all analyses. Due to the diversity of possible releases and the large meteorological data base, the environmental analyses are necessarily performed with the aid of a large computer facility. Several computer programs have been written to facilitate these analyses according to the type of analysis desired. The computer programs described in this report are basically of three categories: probability distributions of estimated concentrations or doses as a function of distance from a point of origin, estimates of average concentrations or doses over a specified time period such as annual averages, and some miscellaneous programs in support of the first two categories to optimize the use of the computing facility. A complete documentation of each program is included with a program listing and sample input-output

  1. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  2. Evaluation of the School Breakfast Program Pilot Project: Findings from the First Year of Implementation. Nutrition Assistance Program Report Series.

    Science.gov (United States)

    McLaughlin, Joan E.; Bernstein, Lawrence S.; Crepinsek, May Kay; Daft, Lynn M.; Murphy, J. Michael

    In 1998, Congress authorized implementation of a 3-year pilot breakfast program involving 4,300 students in elementary schools in 6 school districts representing a range of economic and demographic characteristics. The program began in the 2000-01 school year. This lengthy report presents the findings from the pilot's first year. The study had two…

  3. Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2011-09-13

    This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

  4. Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power

    International Nuclear Information System (INIS)

    Rutherford, P.D.

    1999-01-01

    This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway

  5. 77 FR 67439 - Fiscal Year 2013 Public Transportation on Indian Reservations Program

    Science.gov (United States)

    2012-11-09

    ... Year 2013 Public Transportation on Indian Reservations Program AGENCY: Federal Transit Administration... changes in the Public Transportation on Indian Reservations program (Tribal Transit Program) in accordance... Public Meeting: FTA will provide outreach in conjunction with the National Tribal Transportation...

  6. MOST-7 program for calculation of nonstationary operation modes of the nuclear steam generating plant with WWER

    International Nuclear Information System (INIS)

    Mysenkov, A.I.

    1979-01-01

    The MOST-7 program intended for calculating nonstationary emergency models of a nuclear steam generating plant (NSGP) with a WWER reactor is considered in detail. The program consists of the main MOST-7 subprogram, two main subprograms and 98 subprograms-functions. The MOST-7 program is written in the FORTRAN language and realized at the BESM-6 computer. Program storage capacity in the BESM-6 amounts to 73400 words. Primary information input into the program is carried out by means of information input operator from punched cards and DATA operator. Parameter lists, introduced both from punched cards and by means of DATA operator are tabulated. The procedure of calculational result output into printing and plotting devices is considered. Given is an example of calculating the nonstationary process, related to the loss of power in six main circulating pumps for NSGP with the WWER-440 reactor

  7. Addressing the academic gap between 4- and 6-year pharmacy programs in South Korea.

    Science.gov (United States)

    Yoo, Sujin; Song, Seungyeon; Lee, Sangmi; Kwon, Kwangil; Kim, Eunyoung

    2014-10-15

    To address the academic gap (or lack of adequate training and programs) between 4- and 6-year pharmacy programs and suggest methods for reducing this gap and to evaluate pharmacists' perceptions of preceptorship. We surveyed a convenience sample of 200 community pharmacists who graduated from a 4-year program who were participating in a continuing education program for clinical pharmacy as organized by the Daejeon branch of the Korea Pharmaceutical Association in 2011. Twenty-one questions were asked about the academic gap, needs for an education program, preceptorship, and medication therapy management services. International precedents were examined through a literature review to glean ideas of how to bridge the academic gap between the 4- and 6-year programs. In total, 132 pharmacists answered the survey (return rate=66.0%). The survey findings included problems caused by the academic gap, high need for an adequate education program, low acceptability of preceptorship, and the possibility of medication therapy management services. US-based, non-traditional PharmD programs and new curriculum-support training in Japan provided examples of how the academic gap has been successfully bridged. Nationwide efforts and government support are urgently required to close the academic gap, and experiential education should be included in transitional programs for 4-year pharmacy program pharmacists.

  8. A two-stage stochastic programming approach for operating multi-energy systems

    DEFF Research Database (Denmark)

    Zeng, Qing; Fang, Jiakun; Chen, Zhe

    2017-01-01

    This paper provides a two-stage stochastic programming approach for joint operating multi-energy systems under uncertainty. Simulation is carried out in a test system to demonstrate the feasibility and efficiency of the proposed approach. The test energy system includes a gas subsystem with a gas...

  9. DOE Safety Metrics Indicator Program (SMIP) Fiscal Year 2000 Annual Report of Packaging- and Transportation-related Occurrences

    International Nuclear Information System (INIS)

    Dickerson, L.S.

    2001-01-01

    The U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) is an interactive computer system designed to support DOE-owned or -operated facilities in reporting and processing information concerning occurrences related to facility operations. The Oak Ridge National Laboratory has been charged by the DOE National Transportation Program Albuquerque (NTPA) with the responsibility of retrieving reports and information pertaining to packaging and transportation (P and T) incidents from the centralized ORPS database. These selected reports are analyzed for safety concerns, trends, potential impact on P and T operations, and ''lessons learned'' in P and T safety. To support this analysis and trending, the Safety Metrics Indicator Program (SMIP) was established by the NTPA in fiscal year (FY) 1998. Its chief goal is to augment historical reporting of occurrence-based information by providing (1) management notification of those incidents that require attention, (2) an accurate picture of contractors' P and T-related performance, and (3) meaningful statistics on occurrences at particular sites, including comparisons among different contractor sites and between DOE and the private sector. This annual report contains information on those P and T-related occurrences reported to the ORPS during the period from October 1, 1999, through September 30, 2000. Only those incidents that occur in preparation for transport, during transport, and during unloading of hazardous material are considered as packaging- or transportation-related occurrences

  10. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  11. Evaluation of PWR's operating experience. Significant events which influenced French nuclear power program

    International Nuclear Information System (INIS)

    Dupuis, M.C.

    1986-10-01

    This report discusses developments or changes in safety policy (whether statutory or otherwise) and in plant design and operation, which, in many cases, correlate. When considering these events, it is important to bear in mind the standardization policy characterizing the French nuclear power program, and implying central decision-making, both for the safety authorities and the operating utility [fr

  12. Operation of Wastewater Treatment Plants. Volume 1. A Field Study Training Program. Third Edition. Revised.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    The purpose of this wastewater treatment field study training program is to: (1) develop new qualified wastewater treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  13. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  14. Influence of a 12-year supervised physical activity program for the elderly

    Directory of Open Access Journals (Sweden)

    José Rodrigo Pauli

    2009-06-01

    Full Text Available Aging is an inevitable process and is associated with declining physiological and functional capacity in humans. The objective of this study was to determine the effects of a 12-yearsupervised physical training program on functional fitness in the elderly. Ten women (mean age: 65 years participated in the study. The subjects were divided into two groups: a a trained group consisting of women who had been attending a supervised program including different types of physical activities of moderate intensity over the last 12 years; b an untrained group consisting of women who were not engaged in any supervised physical activity program over the last 12years. Functional fitness was assessed using the AAHPERD field-test battery which comprises five single motor tests: coordination, flexibility, strength endurance, agility and dynamic balance, and overall aerobic endurance. The results showed a better performance of elderly women whoparticipated in a physical activity program over the last 12 years. Thus, whereas elderly women who perform regular physical activities in a supervised program tend to show improvement of all functional fitness components even after a period of 12 years, a tendency towards a reduction in most of these components is observed in their non-active peers. These findings seem to predict an increasing gap in functional fitness between these two groups as they grow older, with opposite effects on the quality of life of these subjects.

  15. Total Hip Arthroplasty – over 100 years of operative history

    Directory of Open Access Journals (Sweden)

    Stephen Richard Knight

    2011-11-01

    Full Text Available Total hip arthroplasty (THA has completely revolutionised the nature in which the arthritic hip is treated, and is considered to be one of the most successful orthopaedic interventions of its generation (1. With over 100 years of operative history, this review examines the progression of the operation from its origins, together with highlighting the materials and techniques that have contributed to its development. Knowledge of its history contributes to a greater understanding of THA, such as the reasons behind selection of prosthetic materials in certain patient groups, while demonstrating the importance of critically analyzing research to continually determine best operative practice. Finally, we describe current areas of research being undertaken to further advance techniques and improve outcomes.

  16. The International Heliophysical Year Education and Outreach Program

    Science.gov (United States)

    Rabello-Soares, M.; Morrow, C.; Thompson, B.

    2006-12-01

    The International Heliophysical Year (IHY) will celebrate the 50th anniversary of the International Geophysical Year (IGY) and will continue its tradition of international research collaboration. The term "heliophysical" is an extension of the term "geophysical", where the Earth, Sun & Solar System are studied not as separate domains but through the universal processes governing the heliosphere. IHY represents a logical next-step, extending the studies into the heliosphere and thus including the drivers of geophysical change. The main goal of IHY Education and Outreach Program is to create more global access to exemplary resources in space and earth science education and public outreach. By taking advantage of the IHY organization with representatives in every nation and in the partnership with the United Nations Basic Space Science Initiative (UNBSSI), we aim to promote new international partnerships. Our goal is to assist in increasing the visibility and accessibility of exemplary programs and in the identification of formal or informal educational products that would be beneficial to improve the space and earth science knowledge in a given country; leaving a legacy of enhanced global access to resources and of world-wide connectivity between those engaged in education and public outreach efforts that are related to IHY science. Here we describe the IHY Education and Outreach Program, how to participate and the benefits in doing so. ~

  17. The Physics Entrepreneurship Program - 11 Years of Teaching and Practicing Innovation and Entrepreneurship to Graduate Students and Beyond

    Science.gov (United States)

    Caner, Edward

    2012-02-01

    The Physics Entrepreneurship Program (PEP) at Case Western Reserve University is a MS in Physics, Entrepreneurship Track that teaches physics, business, and innovation. PEP admitted its first class in 2000 with the original goal of empowering physicists to be successful entrepreneurs. Since Y2K, much has happened in the world's economies and markets, and we have shifted our goals to include a strong innovation component. For instance, our metrics have changed from ``companies created'' to ``capital raised by our students'' (i.e., grants and investment in innovation), which allows our students to participate in an apprentice-type relationship with a more experienced entrepreneur before venturing out on their own (which could take many years before they are ready). We will describe the program, how we teach innovation, student and alumni activities and how difficult it is to operate a sustainable graduate program in this arena.

  18. Mandatory presuit mediation: 5-year results of a medical malpractice resolution program.

    Science.gov (United States)

    Jenkins, Randall C; Smillov, Arlene E; Goodwin, Matthew A

    2014-01-01

    The Florida Patient Safety and Presuit Mediation Program (FLPSMP) is a mandatory mediation program designed to provide deserving patients with fast, fair compensation while limiting the healthcare provider expenses incurred during traditional litigation. Mediation occurs before litigation begins; therefore, patients with meritorious claims receive compensation often years earlier than they would with extended litigation. This early mediation fosters confidential and candid communication between doctors and patients, which promotes early fact-finding and candid discussion. The program went into effect across the University of Florida (UF) Health system on January 1, 2008. In an article previously published in this journal, we discussed the positive trend observed 2 years after the implementation of the FLPSMP. This article incorporates 5 years of data, which includes new benchmarks with state and national data, to demonstrate that the program can be used successfully as a medical malpractice solution. © 2014 American Society for Healthcare Risk Management of the American Hospital Association.

  19. 17 CFR 240.17Ad-21T - Operational capability in a Year 2000 environment.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Operational capability in a Year 2000 environment. 240.17Ad-21T Section 240.17Ad-21T Commodity and Securities Exchanges SECURITIES... Company Rules § 240.17Ad-21T Operational capability in a Year 2000 environment. (a) This section applies...

  20. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report (Part Two of Two)

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  1. Three-year follow-up of 3-year-old to 5-year-old children after participation in a multidisciplinary or a usual-care obesity treatment program

    NARCIS (Netherlands)

    Bocca, Gianni; Corpeleijn, Eva; van den Heuvel, Edwin R.; Stolk, Ronald P.; Sauer, Pieter J. J.

    2014-01-01

    Background & aims: Little is known on the long-term effects of obesity intervention programs in preschool-aged children. We compared the long-term effects of a multidisciplinary treatment program with a usual-care program in seventy-five 3- to 5-year-old overweight or obese children who had

  2. Four-Year Results of a Youth Smoking Prevention Program Using Assertiveness Training.

    Science.gov (United States)

    Del Greco, Linda; And Others

    1986-01-01

    Seventh graders (N=161) participated in health education classes consisting of either an innovative smoking education program, the program plus assertiveness training, or a traditional smoking education program. Data collected four years later revealed no significant differences in smoking behavior, changes in assertion, or sex differences among…

  3. 50 Years of Integer Programming 1958-2008 From the Early Years to the State-of-the-Art

    CERN Document Server

    Jünger, Michael; Naddef, Denis

    2010-01-01

    In 1958, Ralph E. Gomory transformed the field of integer programming when he published a paper that described a cutting-plane algorithm for pure integer programs and announced that the method could be refined to give a finite algorithm for integer programming. In 2008, to commemorate the anniversary of this seminal paper, a special workshop celebrating fifty years of integer programming was held in Aussois, France, as part of the 12th Combinatorial Optimization Workshop. It contains reprints of key historical articles and written versions of survey lectures on six of the hottest topics in the

  4. Operational-safety advantages of LMFBR's: the EBR-II experience and testing program

    International Nuclear Information System (INIS)

    Sackett, J.I.; Lindsay, R.W.; Golden, G.H.

    1982-01-01

    LMFBR's contain many inherent characteristics that simplify control and improve operating safety and reliability. The EBR-II design is such that good advantage was taken of these characteristics, resulting in a vary favorable operating history and allowing for a program of off-normal testing to further demonstrate the safe response of LMFBR's to upsets. The experience already gained, and that expected from the future testing program, will contribute to further development of design and safety criteria for LMFBR's. Inherently safe characteristics are emphasized and include natural convective flow for decay heat removal, minimal need for emergency power and a large negative reactivity feedback coefficient. These characteristics at EBR-II allow for ready application of computer diagnosis and control to demonstrate their effectiveness in response to simulated plant accidents. This latter testing objective is an important part in improvements in the man-machine interface

  5. An anaesthesia information management system as a tool for a quality assurance program: 10years of experience.

    Science.gov (United States)

    Motamed, Cyrus; Bourgain, Jean Louis

    2016-06-01

    Anaesthesia Information Management Systems (AIMS) generate large amounts of data, which might be useful for quality assurance programs. This study was designed to highlight the multiple contributions of our AIMS system in extracting quality indicators over a period of 10years. The study was conducted from 2002 to 2011. Two methods were used to extract anaesthesia indicators: the manual extraction of individual files for monitoring neuromuscular relaxation and structured query language (SQL) extraction for other indicators which were postoperative nausea and vomiting (PONV), pain, sedation scores, pain-related medications, scores and postoperative hypothermia. For each indicator, a program of information/meetings and adaptation/suggestions for operating room and PACU personnel was initiated to improve quality assurance, while data were extracted each year. The study included 77,573 patients. The mean overall completeness of data for the initial years ranged from 55 to 85% and was indicator-dependent, which then improved to 95% completeness for the last 5years. The incidence of neuromuscular monitoring was initially 67% and then increased to 95% (Psystem permitted the follow-up of certain indicators through manual sampling and many more via SQL extraction in a sustained and non-time-consuming way across years. However, it requires competent and especially dedicated resources to handle the database. Copyright © 2016 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  6. Operational performance of the Bangladesh rural electrification program and its determinants with a focus on political interference

    International Nuclear Information System (INIS)

    Taniguchi, Mariko; Kaneko, Shinji

    2009-01-01

    This article tries to quantitatively capture the effect of political intervention on the operational performance of the Bangladesh Rural Electrification Program (REP). Firstly, efficiency changes over the last 15 years of rural electric cooperatives in the REP are examined using data envelopment analysis (DEA). Then, the critical determinants of the efficiency changes including political indicator are identified with an application of the Tobit model. Results from the DEA analysis show the overall efficiency score, on a scale of zero to one, changes in the 0.856-0.929 range in 15 years, with two turnaround points in 1996 and 2001. These are the years that the national elections were held. The results also find a gap between the efficient rural electric cooperatives and the inefficient rural electric cooperatives. The results of the Tobit model imply that political power has a negative impact on efficiency.

  7. Site Environmental Report for Calendar Year 2013. DOE Operations at The Boeing Company, Santa Susana Field Laboratory, Area IV

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-06-30

    This Annual Site Environmental Report (ASER) for 2013 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, operation and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder reactor components. All nuclear work was terminated in 1988, and all subsequent radiological work has been directed toward environmental restoration and decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Liquid metal research and development ended in 2002. Since May 2007, the D&D operations in Area IV have been suspended by the DOE, but the environmental monitoring and characterization programs have continued. Results of the radiological monitoring program for the calendar year 2013 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. Due to the suspension of D&D activities in Area IV, no effluents were released into the atmosphere during 2013. Therefore, the potential radiation dose to the general public through airborne release was zero. Similarly, the radiation dose to an offsite member of the public (maximally exposed individual) due to direct radiation from SSFL is indistinguishable from background. All radioactive wastes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste

  8. Federal Geothermal Research Program Update Fiscal Year 1999

    Energy Technology Data Exchange (ETDEWEB)

    2004-02-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  9. Fusion Safety Program annual report, fiscal year 1984

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.

    1985-06-01

    This report summarizes the Fusion Safety Program major activities in fiscal year 1984. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and EG and G Idaho, Inc., is the prime contractor for this program, which was initiated in 1979. A report section titled ''Activities at the INEL'' includes progress reports on the tritium implantation experiment, tritium blanket permeation, volatilization of reactor alloys, plasma disruptions, a comparative blanket safety assessment, transient code development, and a discussion of the INEL's participation in the Tokamak Fusion Core Experiment (TFCX) design study. The report section titled ''Outside Contracts'' includes progress reports on tritium conversion by the Oak Ridge National Laboratory (ORNL), lithium-lead reactions by the Hanford Engineering Development Laboratory (HEDL) and the University of Wisconsin, magnet safety by the Francis Bitter Magnet Laboratory of the Massachusetts Institute of Technology (MIT) and Argonne National Laboratory (ANL), risk assessment by MIT, tritium retention by the University of Virginia, and activation product release by GA Technologies. A list of publications produced during the year and brief descriptions of activities planned for FY-1985 are also included

  10. Operation Open Heart in PNG, 1993-2006.

    Science.gov (United States)

    Tefuarani, N; Vince, J; Hawker, R; Nunn, G; Lee, R; Crawford, M; Kevau, I H

    2007-10-01

    To report on the 'Operation Open Heart' (OOH) cardiac surgical program in Papua New Guinea (PNG). To document the short-term surgical outcome, the experience gained and the skill transfer from the visiting team members to their PNG counterparts. Analysis of the database compiled from the records of the patients who were operated on by the visiting cardiothoracic surgical team. Four hundred and seventy patients from all regions of the country received operations. Three hundred and thirty seven (72%) were children less than 12 years of age, 39 (8%) were between 12 and 18 years of age and 263 (56%) were females. One hundred and eighty five (40%) patients had open heart procedures. Complications were unremarkable and the short-term mortality was 1.9%. Clinical skills were transferred to, and experience was gained by national anaesthetists, surgeons, paediatricians, physicians and nurses from intensive and full nursing care units and the operating theatre. The program not only achieved a higher annual operation rate than previous programs but also had a lower mortality rate. It achieved its objective of service delivery and, to a considerable extent, its objective of skill transfer. There now is an established and active group of PNG doctors and nurses with the skills, experience and confidence to perform patent ductus repair safely and efficiently. The program is cheaper than its predecessors, and is less disruptive for parents, patients and families.

  11. Energy Extension Service Pilot Program: evaluation report after two years. Volume I. Evaluation summary

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-04-01

    The EES pilot program was initiated in August 1977, when 10 states were selected on a competitive basis for participation. The pilot states (Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming) devoted the first 6 months to start-up activities. This document is a follow-up report to the three volume Evaluation Summary of the first year of the pilot EES program published in September 1979. The purpose of this report is to provide an overview of the impacts and costs of the two years of the pilot program, and to check the consistency of findings over the two year period. The analysis addresses the following: (1) were the impact findings of Year I and Year II consistent, or did Year I and Year II attitudes and behavior vary. If variation existed, could it be attributed to program changes as the EES progressed from a start-up phase (Year I) to more normal service delivery (Year II); and (2) did costs of service delivery change (again reflecting start-up and normal service delivery costs). Did cost changes affect conclusions about the relative cost effectiveness of delivering services to different target audiences.

  12. Program of assessment of mechanical and corrosion mechanical properties of reactor internals materials due to operation conditions in WWERs

    International Nuclear Information System (INIS)

    Ruscak, M.; Zamboch, M.

    1998-01-01

    Reactor internals are subject to three principle operation influences: neutron and gamma irradiation, mechanical stresses, both static and dynamic, and coolant chemistry. Several cases of damage have been reported in previous years in both boiling and pressure water reactors. They are linked with the term of irradiation assisted stress corrosion cracking as a possible damage mechanism. In WWERs, the principal material used for reactor internals is austenitic titanium stabilized stainless steel 08Kh18N10T, however high strength steels are used as well. To assess the changes of mechanical properties and to determine whether sensitivity to intergranular cracking can be increased by high neutron fluences, the experimental program has been started. The goal is to assure safe operation of the internals as well as life management for all planned operation period. The program consists of tests of material properties, both mechanical and corrosion-mechanical. Detailed neutron fluxes calculation as well as stress and deformation calculations are part of the assessment. Model of change will be proposed in order to plan inspections of the facility. In situ measurements of internals will be used to monitor exact status of structure during operation. Tensile specimens manufactured from both base metal and model weld joint have been irradiated to the total fluences of 3-20 dpa. Changes of mechanical properties are tested by the tensile test, stress corrosion cracking tests are performed in the autoclave with water loop and active loading. Operation temperature, pressure and water chemistry are chosen for the tests. (author)

  13. Fire protection program fiscal year 1995 site support program plan, Hanford Fire Department

    International Nuclear Information System (INIS)

    Good, D.E.

    1994-09-01

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report describes the specific responsibilities and programs that the HFD must support and the estimated cost of this support for FY1995

  14. Standarized radiological hazard analysis for a broad based operational safety program

    International Nuclear Information System (INIS)

    Wadman, W.W. III; Andrews, L.L.

    1992-01-01

    The Radiological hazard Analysis (RHA) Manual provides a methodology and detailed guidance for systematic analysis of radiological hazards over a broad spectrum of program functions, housed in a wide variety of facilities. Radiological programs at LANL include: research and experimentation; routine materials operations; production; non-destructive examination or testing; isotope and machine produced radiations; chemistry; and metallurgy. The RHA permits uniform evaluation of hazard types over a range of several orders of magnitude of hazard severity. The results are used to estimate risk, evaluate types and level or resource allocations, identify deficiencies, and plan corrective actions for safe working environments. 2 refs

  15. Standardized radiological hazard analysis for a broad based operational safety program

    International Nuclear Information System (INIS)

    Wadman, W. III; Andrews, L.

    1992-01-01

    The Radiological Hazard Analysis (RHA) Manual provides a methodology and detailed guidance for systematic analysis of radiological hazards over a broad spectrum of program functions, housed in a wide variety of facilities. Radiological programs at LANL include: research and experimentation routine materials operations; production; non-destructive examination or testing; isotope and machine produced radiations; chemistry; and metallurgy. The RHA permits uniform evaluation of hazard types over a range of several orders of magnitude of hazard severity. The results are used to estimate risk, evaluate types and level of resource allocations, identify deficiencies, and plan corrective actions for safe working environments. (author)

  16. A Study on Evaluation of Training Program for MCR Operators of SMART Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyun Jun; Lee, Joon Ku; Jeong, Kwang Il [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    It is important to develop a training program by simulators in main control room of nuclear power plants because there is no an operation expert and no operating experience in the pre-construction phase of nuclear power plants. It is also necessary to develop a training program and its evaluation method taking human error into account. The purpose of this study is developing evaluation model of simulators. In a training program, once training requirements are selected, evaluation of training is as important as its implementation. Training effectiveness is available value in a simulator-based environment. The main control room of SMART (System-integrated Modular Advanced ReacTor) is consist of workstation, visual display units such as LDP and FPD based on digital systems. Cognitive behaviors of a high level are required to operators in these man-machine interface system (MMIS). Therefore, it is essential to identify training requirements and to develop its evaluation model. Virtual Environments such as a simulator have utilized by a lot of industries and companies for training and accident prevention. Simulators have three primary benefits. The first is that training by simulators is less expensive than those in real environment. The second is that simulators enable safety enhancement using systematic training program. The third is that simulators provide a preliminary to prevent human error. It is significant to apply TER, TCR, TCE in evaluation of training effect. It is expected that these could be applied to revise training criteria and enable to consider efficiency in terms of cost and benefit.

  17. A Study on Evaluation of Training Program for MCR Operators of SMART Simulator

    International Nuclear Information System (INIS)

    Park, Hyun Jun; Lee, Joon Ku; Jeong, Kwang Il

    2015-01-01

    It is important to develop a training program by simulators in main control room of nuclear power plants because there is no an operation expert and no operating experience in the pre-construction phase of nuclear power plants. It is also necessary to develop a training program and its evaluation method taking human error into account. The purpose of this study is developing evaluation model of simulators. In a training program, once training requirements are selected, evaluation of training is as important as its implementation. Training effectiveness is available value in a simulator-based environment. The main control room of SMART (System-integrated Modular Advanced ReacTor) is consist of workstation, visual display units such as LDP and FPD based on digital systems. Cognitive behaviors of a high level are required to operators in these man-machine interface system (MMIS). Therefore, it is essential to identify training requirements and to develop its evaluation model. Virtual Environments such as a simulator have utilized by a lot of industries and companies for training and accident prevention. Simulators have three primary benefits. The first is that training by simulators is less expensive than those in real environment. The second is that simulators enable safety enhancement using systematic training program. The third is that simulators provide a preliminary to prevent human error. It is significant to apply TER, TCR, TCE in evaluation of training effect. It is expected that these could be applied to revise training criteria and enable to consider efficiency in terms of cost and benefit

  18. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  19. Creating Authentic Geoscience Research Experiences for Underrepresented Students in Two-Year Undergraduate Programs

    Science.gov (United States)

    Liou-Mark, J.; Blake, R.

    2014-12-01

    With community college and two-year program students playing pivotal roles in advancing the nation's STEM agenda now and throughout the remainder of this young millennia, it is incumbent on educators to devise innovative and sustainable STEM initiatives to attract, retain, graduate, and elevate these students to four-year programs and beyond. Involving these students in comprehensive, holistic research experiences is one approach that has paid tremendous dividends. The New York City College of Technology (City Tech) was recently awarded a National Science Foundation Research Experiences for Undergraduates (REU) supplemental grant to integrate a community college/two-year program component into its existing REU program. The program created an inviting and supportive community of scholars for these students, nurtured them through strong, dynamic mentoring, provided them with the support structures needed for successful scholarship, and challenged them to attain the same research prominence as their Bachelor degree program companions. Along with their colleagues, the community college/two-year program students were given an opportunity to conduct intensive satellite and ground-based remote sensing research at the National Oceanic and Atmospheric Administration Cooperative Remote Sensing Science and Technology Center (NOAA-CREST) at City College and its CREST Institute Center for Remote Sensing and Earth System Science (ReSESS) at City Tech. This presentation highlights the challenges, the rewards, and the lessons learned from this necessary and timely experiment. Preliminary results indicate that this paradigm for geoscience inclusion and high expectation has been remarkably successful. (The program is supported by NSF REU grant #1062934.)

  20. Advanced CANDU reactor design for operability

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Lalonde, R.; Soulard, M.

    2003-01-01

    This paper outlines design features and engineering processes in the ACR TM development program which contribute to excellence in performance and low operating cost. AECL recognizes that future plant owners will place a high priority in these operational characteristics. A successful next generation plant will have a best-in-class capability, both in its design characteristics, in the engineering philosophy and program adopted during the product development, and in the vendor's approach to operating station support. The ACR program addresses each of these drivers. Operability considerations are built-in to the design at an overall, plant wide level. For example, based on the strong CANDU 6 operating record, targets for standard outage duration, time between outages and component durability are set, while the design engineering is managed to achieve these targets. The ultimate maintenance target for the ACR, once initial operating experience has been gained, is to operate with a 21-day standard maintenance outage at an interval of once every three years. At the detailed design level, close attention is paid to space allocation, to enable good maintenance access. Selection of components also places emphasis on maintainability based on the extensive and current experience with CANDU projects. (author)

  1. AECB staff review of Bruce NGS 'B' operation for the year 1989

    International Nuclear Information System (INIS)

    1990-06-01

    The operation of the Bruce Nuclear Generating Station 'B' is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB), which observes operation of the reactors, conducts audits, witnesses important activities, reviews station documentation and reports, and issue approvals, where appropriate, in accordance with licence conditions. This report records the conclusions of the AECB staff assessment of Bruce NGS 'B' during 1989. In general, the station operated within acceptable safety standards. Quality improvement initiatives started in 1989 should lead to improved station maintenance and operation in coming years. Ontario Hydro still needs to improve the administration of operating memos, deficiency reports and call-ups. Station management must ensure that shift supervisors and reactor first operators operate the station in a conservative manner at all times and put safety interests first when responding to a unit upset. (2 tabs.)

  2. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  3. US Department of Energy, Richland Operations Office Integrated Safety Management System Program Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight

  4. Implementation and Analysis of a Lean Six Sigma Program in Microsurgery to Improve Operative Throughput in Perforator Flap Breast Reconstruction.

    Science.gov (United States)

    Hultman, Charles Scott; Kim, Sendia; Lee, Clara N; Wu, Cindy; Dodge, Becky; Hultman, Chloe Elizabeth; Roach, S Tanner; Halvorson, Eric G

    2016-06-01

    Perforator flaps have become a preferred method of breast reconstruction but can consume considerable resources. We examined the impact of a Six Sigma program on microsurgical breast reconstruction at an academic medical center. Using methods developed by Motorola and General Electric, we applied critical pathway planning, workflow analysis, lean manufacturing, continuous quality improvement, and defect reduction to microsurgical breast reconstruction. Primary goals were to decrease preoperative-to-cut time and total operative time, through reduced variability and improved efficiency. Secondary goals were to reduce length of stay, complications, and reoperation. The project was divided into 3 phases: (1) Pre-Six Sigma (24 months), (2) Six Sigma (10 months), (3) and Post-Six Sigma (24 months). These periods (baseline, intervention, control) were compared by Student t test and χ analysis. Over a 5-year period, 112 patients underwent 168 perforator flaps for breast reconstructions, by experienced microsurgeons. Total operative time decreased from 714 to 607 minutes (P Six Sigma program in microsurgical breast reconstruction was associated with better operational and financial outcomes. These incremental gains were maintained over the course of the study, suggesting that these benefits were due, in part, to process improvements. However, continued reductions in total operative time and length of stay, well after the intervention period, support the possibility that "learning curve" phenomenon may have contributed to the improvement in these outcomes.

  5. Storage and distribution/Linear programming for storage operations

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, D

    1978-07-15

    The techniques of linear programing to solve storage problems as applied in a tank farm tie-in with refinery throughput operation include: (1) the time-phased model which works on storage and refinery operations input parameters, e.g., production, distribution, cracking, etc., and is capable of representing product stockpiling in slack periods to meet future peak demands, and investigating alternative strategies such as exchange deals and purchase and leasing of additional storage, and (2) the Monte Carlo simulation method, which inputs parameters, e.g., arrival of crude products at refinery, tankage size, likely demand for products, etc., as probability distributions rather than single values, and is capable of showing the average utilization of facilities, potential bottlenecks, investment required to achieve an increase in utilization, and to enable the user to predict total investment, cash flow, and profit emanating from the original financing decision. The increasing use of computer techniques to solve refinery and storage problems is attributed to potential savings resulting from more effective planning, reduced computer costs, ease of access and more usable software. Diagrams.

  6. Risk averse optimal operation of a virtual power plant using two stage stochastic programming

    International Nuclear Information System (INIS)

    Tajeddini, Mohammad Amin; Rahimi-Kian, Ashkan; Soroudi, Alireza

    2014-01-01

    VPP (Virtual Power Plant) is defined as a cluster of energy conversion/storage units which are centrally operated in order to improve the technical and economic performance. This paper addresses the optimal operation of a VPP considering the risk factors affecting its daily operation profits. The optimal operation is modelled in both day ahead and balancing markets as a two-stage stochastic mixed integer linear programming in order to maximize a GenCo (generation companies) expected profit. Furthermore, the CVaR (Conditional Value at Risk) is used as a risk measure technique in order to control the risk of low profit scenarios. The uncertain parameters, including the PV power output, wind power output and day-ahead market prices are modelled through scenarios. The proposed model is successfully applied to a real case study to show its applicability and the results are presented and thoroughly discussed. - Highlights: • Virtual power plant modelling considering a set of energy generating and conversion units. • Uncertainty modelling using two stage stochastic programming technique. • Risk modelling using conditional value at risk. • Flexible operation of renewable energy resources. • Electricity price uncertainty in day ahead energy markets

  7. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Science.gov (United States)

    2013-07-19

    ... Administration 14 CFR Part 193 [Docket No.: FAA-2013-0375] Technical Operations Safety Action Program (T-SAP) and... Disclosure. SUMMARY: The FAA is proposing that safety information provided to it under the T-SAP, established... to the FAA under the T-SAP and ATSAP, so the FAA can learn about and address aviation safety hazards...

  8. Operational programs in forest management and priority in the utilization of remote sensing

    Science.gov (United States)

    Douglass, R. W.

    1978-01-01

    A speech is given on operational remote sensing programs in forest management and the importance of remote sensing in forestry is emphasized. Forest service priorities in using remote sensing are outlined.

  9. Technical assistance to Department of Energy/Office of Operational Safety Assurance Program for remedial action

    International Nuclear Information System (INIS)

    Denham, D.H.; Cross, F.T.; Kennedy, W.E. Jr.; Marks, S.; Soldat, J.K.; Stenner, R.D.

    1986-01-01

    This project was initiated in FY 1984 to provide technical assistance to the Department of Energy (DOE), Office of Operational Safety (OOS) in developing and implementing its Assurance Program for Remedial Action (APRA), i.e., overview of the DOE remedial action programs. During this second year of the project,* the technical assistance included report and procedure reviews, and assistance with conducting the Uranium Mill Tailings Remedial Action Program (UMTRAP) Office (DOE/AL) appraisal. This included participation in preappraisal visits to UMTRAP sites in Canonsburg, Pennsylvania; Grand Junction, Colorado; and Salt Lake City, Utah. Pacific Northwest Laboratory (PNL) also transferred the PNL-developed document review software to the Oak Ridge Associated Universities (ORAU) staff in Grand Junction, Colorado, in anticipation of future document reviews by the ORAU staff. Other accomplishments have included publication of two formal documents and three project reports, preparation and presentation of five topical reports at national and international meetings, two foreign trip reports, and comments on proposed draft standards of the Environmental Protection Agency (40 CFR 193). The project manager has also participated on National Council on Radiation Protection and Measurements (NCRP) and American Society for Testing and Materials (ASTM) subcommittees developing decommissioning standards, as well as International Atomic Energy Agency (IAEA) advisory groups developing environmental monitoring guidelines

  10. Magnetic Fusion Energy Technology Fellowship Program: Summary of program activities for calendar year 1985

    International Nuclear Information System (INIS)

    1985-01-01

    This report summarizes the activities of the US Department of Energy (DOE) Magnetic Fusion Energy Technology Fellowship program (MFETF) for the 1985 calendar year. The MFETF program has continued to support the mission of the Office of Fusion Energy (OFE) and its Division of Development and Technology (DDT) by ensuring the availability of appropriately trained engineering manpower needed to implement the OFE/DDT magnetic fusion energy agenda. This program provides training and research opportunities to highly qualified students at DOE-designated academic, private sector, and government magnetic fusion energy institutions. The objectives of the Magnetic Fusion Energy Technology Fellowship program are: (1) to provide support for graduate study, training, and research in magnetic fusion energy technology; (2) to ensure an adequate supply of appropriately trained manpower to implement the nation's magnetic fusion energy agenda; (3) to raise the visibility of careers in magnetic fusion energy technology and to encourage students to pursue such careers; and (4) to make national magnetic fusion energy facilities available for manpower training

  11. Federal Geothermal Research Program Update Fiscal Year 2002

    Energy Technology Data Exchange (ETDEWEB)

    2003-09-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  12. Federal Geothermal Research Program Update Fiscal Year 2003

    Energy Technology Data Exchange (ETDEWEB)

    2004-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  13. Computer programs in BASIC language for graphite furnace atomic absorption using the method of additions. Part 1. Operating instructions

    International Nuclear Information System (INIS)

    Boyle, W.G. Jr.; Ryan, D.P.

    1979-01-01

    These instructions describe how to use BASIC language programs to process data from atomic absorption spectrophotometers using the graphite furnace and the method of additions calibration technique. The instructions cover loading the programs, responding to computer prompts, choosing among various options for processing the data, performing operations with an automatic sampler, and producing reports. How the programs interact with each other is also explained. Examples of computer/operator dialogue are presented for typical cases. In addition, a concise set of operating instructions is included as an appendix

  14. Qualification requirements and training programs for nonreactor nuclear facility personnel in the Operations Division of the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Preston, E.L.; Culbert, W.H.; Baldwin, M.E.; McCormack, K.E.; Rivera, A.L.; Setaro, J.A.

    1985-11-01

    This document describes the program for training, retraining, and qualification of nonreactor nuclear operators in the Operations Division of the Oak Ridge National Laboratory. The objective of the program is to provide the Operators and Supervisors of nuclear facilities the knowledge and skills needed to perform assigned duties in a safe and efficient manner and to comply with US Department of Energy Order 5480.1A Chapter V. This order requires DOE nuclear facilities to maintain formal training programs for their operating staff and documentation of that training.

  15. Qualification requirements and training programs for nonreactor nuclear facility personnel in the Operations Division of the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Preston, E.L.; Culbert, W.H.; Baldwin, M.E.; McCormack, K.E.; Rivera, A.L.; Setaro, J.A.

    1985-11-01

    This document describes the program for training, retraining, and qualification of nonreactor nuclear operators in the Operations Division of the Oak Ridge National Laboratory. The objective of the program is to provide the Operators and Supervisors of nuclear facilities the knowledge and skills needed to perform assigned duties in a safe and efficient manner and to comply with US Department of Energy Order 5480.1A Chapter V. This order requires DOE nuclear facilities to maintain formal training programs for their operating staff and documentation of that training

  16. Fusion safety program annual report fiscal year 1997

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Anderl, R.A.; Cadwallader, L.C.

    1998-01-01

    This report summarizes the major activities of the Fusion Safety Program in FY 1997. The Idaho National Engineering and Environmental Laboratory (INEEL) is the designated lead laboratory, and Lockheed Martin Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in FY 1979 to perform research and develop data needed to ensure safety in fusion facilities. Activities include experiments, analysis, code development and application, and other forms of research. These activities are conducted at the INEEL, different DOE laboratories, and other institutions. The technical areas covered in this report include chemical reactions and activation product release, tritium safety, risk assessment failure rate database development, and safety code development and application to fusion safety issues. Most of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER) project. Work done for ITER this year has focused on developing the needed information for the Non-site Specific Safety Report (NSSR-2)

  17. Fusion safety program annual report fiscal year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Longhurst, G.R.; Anderl, R.A.; Cadwallader, L.C. [and others

    1998-01-01

    This report summarizes the major activities of the Fusion Safety Program in FY 1997. The Idaho National Engineering and Environmental Laboratory (INEEL) is the designated lead laboratory, and Lockheed Martin Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in FY 1979 to perform research and develop data needed to ensure safety in fusion facilities. Activities include experiments, analysis, code development and application, and other forms of research. These activities are conducted at the INEEL, different DOE laboratories, and other institutions. The technical areas covered in this report include chemical reactions and activation product release, tritium safety, risk assessment failure rate database development, and safety code development and application to fusion safety issues. Most of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER) project. Work done for ITER this year has focused on developing the needed information for the Non-site Specific Safety Report (NSSR-2).

  18. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  19. Security Transition Program Office 1994 fiscal year work plan WBS 6.11

    International Nuclear Information System (INIS)

    Brogdon, R.C. Jr.

    1993-10-01

    The Security Transition Program Office (STPO) will change the Hanford Safeguards and Security Protection Program from one that supported the national defense program to one that supports environmental restoration and waste management. A Successful Safeguards and Security Protection Program transition will have an industrial security foundation supplemented to protect material interests and information resources. The transition will change the current approaches to protection philosophy to ones that will provide the Hanford Site with the following: consolidation, reduction, and elimination of safeguards and security interests and targets; greater open Site access; maximum application of technology and automation; interpretation of security policies and procedures in light of the Hanford Site's environmental mission; coexistence with other emergency services; streamlined operations; and protection of employees and the public from health, safety, fire, security, and safeguards risks. This report describes the 1994 program objectives, the technical base, schedule baseline, cost, funding, manpower, and the 1993 program workscope

  20. AECB staff review of Bruce NGS 'A' operation for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    AECB project staff believes that overall performance of the station in 1988 was generally satisfactory and better than in 1987. However, this assessment is not supported by some of the key performance indicators, although the indicators in areas where AECB staff had specific concerns do support it. For example, the percentage of reported significant events attributable to human error, the number of operating memos beyond the review date, scheduled emergency drills completed, the number of completed reactor trips all show a significant improvement over the 1987 value. In addition, AECB staff has been encouraged by the licensee's implementation of effective review processes for operator and maintenance call-ups, routines and deficiencies, and the establishment of supervisor inspection tours and operator rounds programs. Nevertheless, it is the opinion of AECB staff that to achieve standards of operation which would be considered fully satisfactory, the backlog of maintenance work must be reduced, the quality of work performed in the plant improved, and assurance provided that the required quality standards are being consistently achieved and maintained

  1. An Evaluation of State Energy Program Accomplishments: 2002 Program Year

    Energy Technology Data Exchange (ETDEWEB)

    Schweitzer, M.

    2005-07-13

    cost savings and emissions reductions associated with SEP activities performed by the states during the 2002 program year, based on primary data provided by the states themselves. This is the second systematic evaluation of SEP accomplishments performed by Oak Ridge National Laboratory (ORNL) for DOE. A report documenting the findings of the first study was published in January 2003 (Schweitzer et.al., 2003).

  2. Daya Bay Nuclear Power Station five-year business plan and operating results

    International Nuclear Information System (INIS)

    Zhang Shanming

    2000-01-01

    Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level

  3. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  4. CRBRP flow induced vibration program

    Energy Technology Data Exchange (ETDEWEB)

    Novendstern, E H [Westinghouse Advanced Reactor Division, Madison, PA (United States); Grochowski, F A; Yang, T M [General Electric Co., Fast Breeder Reactor Department, Sunnyvale, CA (United States); Ryan, J A; Mulcahy, T M

    1977-12-01

    The program to assure the structural adequacy of Clinch River Breeder Reactor (CRBRP) components during its planned 30 years of operation is described. The program includes (1) an assessment of reactor components relative to their susceptibility to FIV, (2) designing to minimize component excitation due to Fluid induced vibrations (FIV), (3) scale model tests to measure structural response during simulated operating conditions and (4) preoperational tests. An overview of the CRBRP test program is described. Additionally, details of scale model testing of reactor internals and the steam generator is described in more detail. (author)

  5. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  6. An analysis of HANARO operating performance of the year 2001

    International Nuclear Information System (INIS)

    Yoon, D. B.; Choi, H. Y.; Lim, I. C.; Hwang, S. Y.

    2002-01-01

    For the evaluation of operating performance of the HANARO, operation data of the year 2001 were analyzed. Power output, delay times for full-power arrival and shutdown were considered as the representative measures of operating performance. The analysis results show that the total thermal power output is 3770MWD, which is the best record since the startup of the HANARO. The mean values of the delay time for full-power arrival and shutdown are calculated as 3.56 hours and 2.49 hours, respectively. The major causes for the delay of full-power arrival and shutdown are found to be the retardation of the fuel inspection, and unscheduled work for maintenance and experiment. In order to enhance the operating performance, based on the analysis results, biweekly-prearranged plan for working and experiment will be prepared in advance. The starting time of the reactor has been moved up by 1 hour for reaching the full power before the scheduled time. In addition, we will make effort so as to reduce the number of fuels that have to be inspected

  7. Monitoring of good practices programs and independence for electricity and natural gas system operators - 2013-2014 report

    International Nuclear Information System (INIS)

    Monteil, Anne; Casadei, Cecile

    2014-12-01

    This report results from the analysis of 'reports on the implementation of good practices programs' transmitted to the CRE (the French Commission for energy regulation) at the beginning of 2014 by those in charge of operators compliance. The report is structured in two thematic files, completed by individual analyses of the situation of each operator. These thematic files respectively address the processing of claims by the different natural gas operators, and the processing by ERDF of requests of connection to the grid of renewable energy production installations in the South-West of France. For each operator, the analysis comprises an assessment of independence, and an assessment of the compliance with the good practice program by the operator. For these individual analyses, the report makes a distinction between distribution network operators (ERDF, GRDF, Electricite de Strasbourg, Geredis, SRD, URM, Regaz-Bordeaux, Reseau GDS) and transport network operators (RTE, GRTgaz, TIGF)

  8. The INEL Human Reliability Program: The first two years of experience

    International Nuclear Information System (INIS)

    Minner, D.E.

    1986-01-01

    This paper provides a review of the design, implementation, and operation of the INEL Human Reliability Program from January 1984 through June of 1986. Human Reliability Programs are defined in terms of the ''insider threat'' to security of nuclear facilities. The design of HRP's are discussed with special attention given the special challenge of the disgruntled employee. Each component of an HRP is reviewed noting pitfalls and opportunities with each: drug testing of applicants and incumbents, psychological evaluation by management, security clearance procedures and administration including the use of an Employee Review Board to recommend action prior to final management decision

  9. DITTY - a computer program for calculating population dose integrated over ten thousand years

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.

    1986-03-01

    The computer program DITTY (Dose Integrated Over Ten Thousand Years) was developed to determine the collective dose from long term nuclear waste disposal sites resulting from the ground-water pathways. DITTY estimates the time integral of collective dose over a ten-thousand-year period for time-variant radionuclide releases to surface waters, wells, or the atmosphere. This document includes the following information on DITTY: a description of the mathematical models, program designs, data file requirements, input preparation, output interpretations, sample problems, and program-generated diagnostic messages

  10. Site Environmental Report for Calendar Year 2000. DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    Energy Technology Data Exchange (ETDEWEB)

    Rutherford, Phil [The Boeing Company, Canoga Park, CA (United States); Samuels, Sandy [The Boeing Company, Canoga Park, CA (United States); Lee, Majelle [The Boeing Company, Canoga Park, CA (United States)

    2001-09-01

    This Annual Site Environmental Report (ASER) for 2000 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2000 continue to indicate no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

  11. Light Water Reactor Sustainability Program Integrated Program Plan

    International Nuclear Information System (INIS)

    Griffith, George; Youngblood, Robert; Busby, Jeremy; Hallbert, Bruce; Barnard, Cathy; McCarthy, Kathryn

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  12. Light Water Reactor Sustainability Program Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  13. Fusion Safety Program annual report, fiscal year 1983

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.

    1984-07-01

    The Fusion Safety Program major activities for Fiscal Year 1983 are summarized in this report. The program was initiated in FY 1979, with the Idaho National Engineering Laboratory (INEL) designated lead laboratory, and EG and G Idaho, inc., named as prime contractor to implement this role. The report contains four sections: EG and G Idaho, Inc., activities at the INEL includes progress reports and portions of papers on the tritium implantation experiment, tritium control systems, tritium release from solid breeding blankets, plasma disruptions, risk assessment, transient code development, data base development, and a discussion of participation in the blanket comparison and selection study. The section outside contracts includes progress reports and portions of papers on lithium-lead reactions by Hanford Engineering Development Laboratory (HEDL) and the University of Wisconsin, magnet safety by the Francis Bitter Magnet Laboratory of the Massachusetts Institute of Technology (MIT) and Argonne National Laboratory (ANL), risk assessment by the University of California at Los Angeles (UCLA) and MIT, tritium retention by the University of Virginia, and effects of plasma disruptions by MIT. A list of publications and planned fiscal year 1984 activities are also included

  14. The Denver region traffic signal system improvement program : planning for management and operations

    Science.gov (United States)

    2009-04-01

    The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...

  15. Development and implementation of the waste diversion program at MDS Nordion's Cobalt Operations Facility

    International Nuclear Information System (INIS)

    Wasiak, T.

    2004-01-01

    Historically, the MDS Nordion (MDSN) Cobalt Operations Facility sent solid waste for disposal to Atomic Energy of Canada Ltd.'s Chalk River Laboratories (AECL-CRL). A large portion of this waste was not contaminated. Because this non-contaminated waste originated in the 'active area' of the MDSN facility, it was routinely disposed of as low-level active waste. In 2002, MDSN undertook an initiative to develop and implement a more sophisticated and more economical waste management program. The Waste Diversion Program (WDP) ensures continued environmental and public protection, and reduces the demand on Canada's limited capacity for storage of radioactive material and the associated operating costs. The goal of the WDP is to reduce the volume of waste currently being shipped to AECL-CRL's Waste Management Operation as low-level active waste. The presentation discusses key elements of both the development and the implementation of WDP. It focuses on the following areas: the regulatory environment surrounding the waste disposal issues in Canada and abroad. Methods used by MDSN for determination of radionuclides, which could be present in the facility. Choice of equipment and calculation of individual alarm levels for each identified radionuclide. Key elements of the practical implementation of the program. CNSC Regulatory approval process. The bottom line - dollars and cents. The primary objective of the WDP is to ensure that only waste, which meets regulatory requirements, is diverted from the solid active waste stream. This has been successfully accomplished in MDSN's Cobalt Operations Facility. The objective of the presentation is to share the knowledge and experience obtained in the development process, and thus provide a guideline for other nuclear facilities interested in establishing similar proactive and cost effective programs. (author)

  16. Light Water Reactor Sustainability Program: Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-05-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear

  17. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    Science.gov (United States)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  18. 175 Years of Linear Programming - Minimax and Cake Topography

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 7. 175 Years of Linear Programming - Minimax and Cake Topography. Vijay Chandru M R Rao. Series Article Volume 4 Issue 7 July 1999 pp 4-13. Fulltext. Click here to view fulltext PDF. Permanent link:

  19. Program of experiments for the operating phase of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Simmons, G.R.; Bilinsky, D.M.; Davison, C.C.; Gray, M.N.; Kjartanson, B.H.; Martin, C.D.; Peters, D.A.; Lang, P.A.

    1992-09-01

    The Underground Research Laboratory (URL) is one of the major research and development facilities that AECL Research has constructed in support of the Canadian Nuclear Fuel Waste Management Program. The URL is a unique geotechnical research facility constructed in previously undisturbed plutonic rock, which was well characterized before construction. The site evaluation and construction phases of the URL project have been completed and the operating phase is beginning. A program of operating phase experiments that address AECL's objectives for in situ testing has been selected. These experiments were subjected to an external peer review and a subsequent review by the URL Experiment Committee in 1989. The comments from the external peer review were incorporated into the experiment plans, and the revised experiments were accepted by the URL Experiment Committee. Summaries of both reviews are presented. The schedule for implementing the experiments and the quality assurance to be applied during implementation are also summarized. (Author) (9 refs., 11 figs.)

  20. Tore Supra: technical aspects and early results after one year of operation

    International Nuclear Information System (INIS)

    Gravier, R.

    1989-01-01

    After one year operation (1988 to 1989), technical aspects of component systems and equipment of Tore Supra are summarized. Particular attention is given to the operation with: supraconducting toroidal field coil system, cryogenic system, poloidal field system, in vessel equipment, first wall conditioning, pump limiter. The ergodic divertor experiments and the current drive experiment are reported. The plasma heating methods adopted in Tore Supra are presented

  1. National Weatherization Assistance Program Characterization Describing the Recovery Act Period

    Energy Technology Data Exchange (ETDEWEB)

    Tonn, Bruce Edward [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rose, Erin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hawkins, Beth A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-10-01

    This report characterizes the U.S. Department of Energy s Weatherization Assistance Program (WAP) during the American Recovery and Reinvestment Act of 2009 (Recovery Act) period. This research was one component of the Recovery Act evaluation of WAP. The report presents the results of surveys administered to Grantees (i.e., state weatherization offices) and Subgrantees (i.e., local weatherization agencies). The report also documents the ramp up and ramp down of weatherization production and direct employment during the Recovery Act period and other challenges faced by the Grantees and Subgrantees during this period. Program operations during the Recovery Act (Program Year 2010) are compared to operations during the year previous to the Recovery Act (Program Year 2008).

  2. Candu Energy's Aging and Obsolescence Program and its Application to Operating Facilities and New Plant Design

    International Nuclear Information System (INIS)

    Dam, R.; Gold, R.; McCrea, L.

    2012-01-01

    While plant aging is inevitable, predictable and 'graceful 'aging' behavior can be achieved through the implementation of a comprehensive and integrated Plant Life Management (PLiM) program. Despite organizations like the IAEA and INPO placing more emphasis on equipment reliability, there is still a lack of completely integrated programs in the industry as evidenced by: - Piece-meal, often crisis-driven, implementation comprising many different, partial solutions; - Duplication of effort often seen when different groups work in 'silos'. A strategy which fits with existing plant processes and programs, and which coordinates a broad range of equipment reliability activities is key to achieving the desired results. An example of such a program is the Aging and Obsolescence Program (AOP). AOP follows application of INPO AP-913 guidance for equipment reliability. The program is augmented to include single point vulnerability identification, unified approach to short and long lived components, risk management, spare parts management, and the identification and resolution of obsolescence issues. The systematic nature of the program provides the needed foundation to old and new stations alike. For existing operating stations some of the key uses include outage interval extension, reduced forced outages, and/or outage time reduction, any of which can translate into improving plant performance, competitiveness, and significant dollars saved. Program elements applied to new plant design are commensurate with the industry direction to 'design for reliability', and has allowed Candu Energy to learn and to improve upon what it can offer to operating stations. This paper intends to describe the basic elements of Candu Energy's Aging and Obsolescence Program and will share some of the experience having applied it to existing operating stations, consider applications to support expanding regulatory requirements, and describe the integration into the design of new plants, promoting

  3. Idaho chemical programs annual technical report, fiscal year 1974

    International Nuclear Information System (INIS)

    Bower, J.R.

    1975-01-01

    The operating experience in fuel processing, waste calcining, and other waste management activities for FY 1974 is summarized. A new zirconium fuel dissolver has performed well, and the first-cycle extraction system shows near-zero losses. Technical support activities include: a flowsheet to reduce acid consumption and volume of liquid wastes in the electrolytic process; a new dissolution process for ternary oxide PWR fuel using zirconium-fluoride-nitric acid dissolvent; a study and recommendation for treatment of fuel storage basin water; progress in design and development of processes for Rover and HTGR fuels, corrosion evaluation of bins containing calcined wastes showing corrosion rates indicative of a safe 500-year or greater storage life; demonstration on a pilot-plant scale of conditions for calcination of stainless steel and Rover fuel wastes as well as commercial wastes; evaluation of equipment alternatives for a new waste calcining facility; studies related to improvements in rare gas recovery and process off-gas treatment; demonstration of stability when various high-level waste solutions are mixed; progress on postcalcination treatment of calcined waste solids (ceramic formation, incorporation in metals, and calcine-concretes); studies on removal of actinides from ICPP wastes; a conceptual design for a proposed radioactive solid-waste repackaging facility for the INEL. Significant progress is reported on the program for determination of burnup for fast breeder reactor fuels. (U.S.)

  4. From Deck Hand to Program Manager - 30 years with Research Vessels

    Science.gov (United States)

    Prince, J. M.

    2012-12-01

    Starting in 1980 as a Mate and Deck Hand and working my way up to Captain, Marine Superintendent, UNOLS Executive Secretary and now as an ONR Research Facilities Program Manager focused on the acquisition of two new Ocean Class Research Vessels, I have witnessed first hand the evolution of the U.S. Academic Research Fleet. The author will focus on a few key events in the evolution of the modern research fleet. As a deck hand, mate and Captain, I was involved in an early multi-disciplinary effort often using two ships working together to conduct sampling and analysis in Physical, Chemical and Biological oceanography. The VERTEX cruises led by John Martin and others used the R/V CAYUSE and R/V WECOMA extensively through out the NE Pacific Ocean conducting research that led to Dr. Martin's Iron Hypothesis. This work and that of others involving trace metal clean sampling and clean laboratories on board our ships pushed many new and demanding requirements for future vessels. As a ship scheduler and as chair of the Research Vessel Operators Committee (RVOC) I saw the increasing use of Remotely Operated Vehicles to complement the work being done with the ALVIN and other occupied submersibles. This led to scheduling challenges and changes to our safety standards, but also to many new opportunities for discoveries on the many mid-ocean ridges and hydro-thermal vent fields. More recently, Autonomous Underwater Vehicles (AUV) and Unmanned Aerial Vehicles (UAV) and aircraft have been used simultaneously with research vessels such as during a multi-PI, multi-ship program in the Monterey Bay. Communications at sea have changed dramatically in the past thirty years. No longer are we limited to reading the data from a spreadsheet over a Single Side Band radio so that the PI ashore can track the progress of a cruise and provide guidance for the next day's sampling. Full bandwidth communications are becoming the norm with the capability of streaming video from an ROV to shore or to

  5. A program to operate the TSI electrical aerosol analyser using an IBM-PC microcomputer - technical background

    International Nuclear Information System (INIS)

    Horton, K.D.; Mitchell, J.P.; Snelling, K.W.

    1988-02-01

    A program has been written to enable the TSI Electrical Aerosol Analyser (EAA model 3030) to be operated using an IBM-PC microcomputer. Although much of the program is based on the software supplied by TSI Inc to collect and process data from the EAA, it incorporates numerous improvements including the option to operate the EAA automatically via a TSI Differential Mobility Particle Sizer interface. When compiled, the program enables the data reduction which takes into account the significant cross-channel sensitivity of the EAA, to be performed in about 30 seconds making it possible to use the EAA to monitor rapid changes in the behaviour of sub-micron aerosol particles. (author)

  6. Engaging the Public Through a Joint Outreach Program with the Appalachian Mountain Club - A Successful First Year

    Science.gov (United States)

    Arion, Douglas N.; DeLucia, S.; Anderson, K.; Tatge, C.; Troyer, Z. D.

    2013-01-01

    Carthage College and the Appalachian Mountain Club (AMC) formed a partnership to deliver hands-on astronomy programs to the public, train mentors and docents, and provide experiential learning opportunities for astronomy students. In its first year of operation the program reached over 2000 visitors, and engaged them in daytime and nighttime observing, lectures and presentations, and workshops. The AMC serves more than 500,000 visitors each year at its lodges, centers, and high-mountain huts and delivers a wealth of experiences in nature and the environment. Through this project Carthage and the AMC have added astronomy to the education programming to provide a holistic, integrative picture of the workings of the universe to the lay public. The presentations given are atypical of astronomy outreach, as they emphasize the physical connections and linkages among many disciplines with astronomy. For example, the coincidence between eye color sensitivity and the solar spectrum; the evolutionary patterns that resulted from asteroid impacts; and the seasonal variation in animal coat colors are emphasized as much as the scale of the Universe and the typical stellar nucleosynthesis (the ‘we are stardust’ analogy) that are often covered. An extensive evaluation and assessment process has been implemented, and results of those studies show significant impact on participants. Participants ranged from older, more experienced AMC visitors to elementary and middle school students in the Mountain Classroom program, as well as a wide range of visitors from across the country. In addition to these programs, training workshops have been implemented for all AMC staff who work with the public, including those at the high mountain huts, the naturalists, and AMC volunteers. This work was supported in part by the National Science Foundation AST Division.

  7. French experience in operating pressurized water reactor power stations. Ten years' operation of the Ardennes power station

    International Nuclear Information System (INIS)

    Teste du Bailler, A.; Vedrinne, J.F.

    1978-01-01

    In the paper the experience gained over ten years' operation of the Ardennes (Chooz) nuclear power station is summarized from the point of view of monitoring and control equipment. The reactor was the first pressurized water reactor to be installed in France; it is operated jointly by France and Belgium. The equipment, which in many cases consists of prototypes, was developed for industrial use and with the experience that has now been gained it is possible to evaluate its qualities and defects, the constraints which it imposes and the action that has to be taken in the future. (author)

  8. 10 CFR 436.102 - General operations plan format and content.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...

  9. Fusion Safety Program annual report, fiscal year 1992

    International Nuclear Information System (INIS)

    Holland, D.F.; Cadwallader, L.C.; Herring, J.S.; Longhurst, G.R.; McCarthy, K.A.; Merrill, B.J.; Piet, S.J.

    1993-01-01

    This report summarizes the major activities of the Fusion Safety Program in fiscal year 1992. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and EG ampersand G Idaho, Inc. is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations including the Westinghouse Hanford Company at the Hanford Engineering Development Laboratory, the Massachusetts Institute of Technology, and the University of Wisconsin. The technical areas covered in the report include tritium safety, activation product release, reactions involving beryllium, reactions involving lithium breeding materials, safety of fusion magnet systems, plasma disruptions, risk assessment failure rate data base, and computer code development for reactor transients. Also included in the report is a summary of the safety and environmental studies performed by the INEL for the Tokamak Physics Experiments and the Tokamak Fusion Test Reactor, the safety analysis for the International Thermonuclear Experimental Reactor design, and the technical support for the ARIES commercial reactor design study

  10. Fusion Safety Program Annual Report, Fiscal Year 1996

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Anderl, R.A.; Cadwallader, L.C.

    1996-12-01

    This report summarizes the major activities of the Fusion Safety Program in FY 1996. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory, and Lockheed Martin Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. The objective is to perform research and develop data needed to ensure safety in fusion facilities. Activities include experiments, analysis, code development and application, and other forms of research. These activities are conducted at the INEL, at other DOE laboratories, and at other institutions. Among the technical areas covered in this report are tritium safety, chemical reactions and activation product release, risk assessment failure rate database development, and safety code development and application to fusion safety issues. Most of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Work done for ITER this year has focused on developing the needed information for the Non- Site- Specific Safety Report (NSSR-1). A final area of activity described is development of the new DOE Technical Standards for Safety of Magnetic Fusion Facilities

  11. Women in science & engineering scholarships and summer camp outreach programs : year 7.

    Science.gov (United States)

    2014-08-01

    Since the UTC Scholarship program began in the spring of 2005 and continues today on the S&T campus, numerous female students : have benefitted tremendously from this source of financial aid. The program began in the first few years with 15-30 awards...

  12. 17 CFR 240.15b7-3T - Operational capability in a Year 2000 environment.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Operational capability in a Year 2000 environment. 240.15b7-3T Section 240.15b7-3T Commodity and Securities Exchanges SECURITIES... § 240.15b7-3T Operational capability in a Year 2000 environment. (a) This section applies to every...

  13. An Embedded Librarian Program: Eight Years On.

    Science.gov (United States)

    Freiburger, Gary; Martin, Jennifer R; Nuñez, Annabelle V

    2016-01-01

    This article examines an embedded librarian program eight years after implementation in a large academic health center. Librarians were physically moved into the colleges of pharmacy, public health, and nursing. Statistics are reported as well as comments from the participating librarians and faculty members. Strong relationships have been built between librarians, faculty members, and students. Locating the librarians among faculty and students led to a better understanding of client needs and an increased awareness of librarian competencies and services resulting in partnerships and greater utilization of library services.

  14. Thirteen years and counting: Outcomes of a concurrent ASN/BSN enrollment program.

    Science.gov (United States)

    Heglund, Stephen; Simmons, Jessica; Wink, Diane; D'Meza Leuner, Jean

    In their 2011 report, The Future of Nursing, the Institute of Medicine called for 80% of the nursing workforce to be comprised of baccalaureate prepared Registered Nurses by the year 2020. One suggested approach to achieve this goal is the creation of programs that allow students to progress through associate and baccalaureate nursing preparation simultaneously. This paper describes the University of Central Florida's 13-year experience after implementing a Concurrent Enrollment Program. Development and structure of the program, advisement and curriculum details, facilitators and barriers are described. Data on National Council Licensure Examination for Registered Nurses pass rates, completion rates, comparison with traditional RN-BSN students, and progression to graduate school are also included. The Concurrent Program model described here between a specific university and state college partners, demonstrated positive outcomes that support achievement of the Institute of Medicine's goals. Copyright © 2017 Elsevier Inc. All rights reserved.

  15. Environmental program with operational cases to reduce risk to the marine environment significantly

    International Nuclear Information System (INIS)

    Cline, J.T.; Forde, R.

    1991-01-01

    In this paper Amoco Norway Oil Company's environmental program is detailed, followed by example operational programs and achievements aimed to minimize environmental risks to the marine environment at Valhall platform. With a corporate goal to be a leader in protecting the environment, the appropriate strategies and policies that form the basis of the environmental management system are incorporated in the quality assurance programs. Also, included in the program are necessary organizational structures, responsibilities of environmental affairs and line organization personnel, compliance procedures and a waste task force obliged to implement operations improvements. An internal environmental audit system has been initiated, in addition to corporate level audits, which, when communicated to the line organization closes the environmental management loop through experience feed back. Environmental projects underway are significantly decreasing the extent and/or risk of pollution from offshore activities. The cradle to grave responsibility is assumed with waste separated offshore and onshore followed by disposal in audited sites. A $5 MM program is underway to control produced oily solids and reduce oil in produced water aiming to less than 20 ppm. When oil-based mud is used in deeper hole sections, drill solids disposed at sea average less than 60 g oil/kg dry cuttings using appropriate shaker screens, and a washing/centrifuge system to remove fines. Certain oily liquid wastes are being injected down hole whereas previously they were burned using a mud burner. Finally, a program is underway with a goal to eliminate sea discharge of oil on cuttings through injection disposal of oily wastes, drilling with alternative muds such as a cationic water base mud, and/or proper onshore disposal of oily wastes

  16. Operator training and the training simulator experience

    International Nuclear Information System (INIS)

    Mills, D.

    The author outlines the approach used by Ontario Hydro to train operators from the day they are hired as Operators-in-Training until they are Authorized Unit First Operators. He describes in detail the use of the simulator in the final year of the authorization program, drawing on experience with the Pickering NGS A simulator. Simulators, he concludes, are important aids to training but by no means all that is required to guarantee capable First Operators

  17. Development of a Reliability Program approach to assuring operational nuclear safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques used in other high technology industries is being formulated for potential application in the nuclear power industry. Research findings are discussed. The reliability methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed with several reliability concepts (e.g., quantitative reliability goals, reliability centered maintenance) appearing to be directly transferable. Other tasks in the RP development effort involved the benchmarking and evaluation of the existing nuclear regulations and practices relevant to safety/reliability integration. A review of current risk-dominant issues was also conducted using results from existing probabilistic risk assessment studies. The ongoing RP development tasks have concentrated on defining a RP for the operating phase of a nuclear plant's lifecycle. The RP approach incorporates safety systems risk/reliability analysis and performance monitoring activities with dedicated tasks that integrate these activities with operating, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the RP

  18. Hunterston A: first sixteen years of operation

    International Nuclear Information System (INIS)

    Dominey, J.R.; Battle, T.A.; Brow, N.J.; Laing, D.; Leary, D.E.

    1981-01-01

    Construction of Hunterston A was started in 1957. Commissioning of both reactors was completed in 1964, and since that date the Station has achieved a life-time load factor of 82.2% based on the original design output of 300MWe sent out. The identification in 1968 of enhanced oxidation rates of certain mild steels in CO 2 at temperatures in excess of 360 0 C led to the decision to operate the reactors at gas outlet temperatures of 360 0 C to maximise reactor component life. A fractured burst cartridge detection pipe was discovered in 1968 during reactor internal photographic surveys. Other problems encountered during the 16 years include 70 fuel element failures from 1964 to date and a number of internal boiler tube failures which occurred between 1964 and 1968. (U.K.)

  19. Are 2 Years Enough? Exploring Technical Skills Acquisition Among General Surgery Residents in Brazil.

    Science.gov (United States)

    Santos, Elizabeth G; Salles, Gil F

    2016-01-01

    Phenomenon: Recent studies have shown that up to 40% of the General Surgery (GS) residents are not confident with their surgical skills. There is concern that residents are at risk of receiving inadequate training due to the low number of operations they perform. In Brazil, although all GS residents receive by law the Board Certification at the end of their programs, the assessment of their technical skills is not mandatory in Medical Residency programs' training. Consequently, our concern was that current GS medical residency format might be insufficient to create competent and autonomous general surgery residents after 2 years of regular training. Hence, the aim was to assess GS residents' surgical skills in their final months of training to evaluate the present format of GS residency programs in Brazil. Trained surgical faculty members directly observed 11 operations of varying difficulty performed by 2nd-year regular GS residents and by 4th-year residents in the optional Advanced Program in General Surgery. Participants were located at 3 university and 3 nonuniversity hospitals in Rio de Janeiro and Sao Paulo (Brazil's largest cities). Surgical skills were assessed using an internally developed observation checklist reviewed by subject matter experts. Sixty residents (46 regular 2nd-year trainees and 14 advanced 4th-year trainees) were assessed on performing 499 operations. Only 10 residents (17%), all advanced 4th-year residents, satisfactorily performed all operations and were considered eligible for the Board Certification. Even after excluding the 2 operations of greatest difficulty, only 24 regular 2nd-year residents (52%) satisfactorily performed the other 9 operations. Residents from hospitals with open Emergency Departments performed better than those from hospitals without Emergency Departments. Insights: The results of this pilot study suggest that residents with 2 years of training are not prepared for independent high-level surgical practice. The

  20. Robotic mitral valve operations by experienced surgeons are cost-neutral and durable at 1 year.

    Science.gov (United States)

    Coyan, Garrett; Wei, Lawrence M; Althouse, Andrew; Roberts, Harold G; Schauble, Drew; Murashita, Takashi; Cook, Chris C; Rankin, J Scott; Badhwar, Vinay

    2018-04-12

    Robotic mitral valve surgery has potential advantages in patient satisfaction and 30-day outcome. Cost concerns and repair durability limit wider adoption of robotic technology. This study examined detailed cost differences between robotic and sternotomy techniques in relation to outcomes and durability following robotic mitral program initiation. Between April 2013 and October 2015, 30-day and 1-year outcomes of 328 consecutive patients undergoing robotic or sternotomy mitral valve repair or replacement by experienced surgeons were examined. Multivariable logistic regression informed propensity matching to derive a cohort of 182 patients. Echocardiographic follow-up was completed at 1 year in all robotic patients. Detailed activity-based cost accounting was applied to include direct, semidirect, and indirect costs with special respect to robotic depreciation, maintenance, and supplies. A quantitative analysis of all hospital costs was applied directly to each patient encounter for comparative financial analyses. Mean predicted risk of mortality was similar in both the robotic (n = 91) and sternotomy (n = 91) groups (0.9% vs 0.8%; P > .431). The total costs of robotic mitral operations were similar to those of sternotomy ($27,662 vs $28,241; P = .273). Early direct costs were higher in the robotic group. There was a marked increase in late indirect cost with the sternotomy cohort related to increased length of stay, transfusion requirements, and readmission rates. Robotic repair technique was associated with no echocardiographic recurrence greater than trace to only mild regurgitation at 1 year. Experienced mitral surgeons can initiate a robotic program in a cost-neutral manner that maintains clinical outcome integrity as well as repair durability. Copyright © 2018 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  1. Program summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating, construction, and development activities of the Department of Energy in the areas of uranium enrichment are described. The DOE supplies the enrichment service through toll enrichment contracts with foreign and domestic utilities by enriching uranium supplied by the utility to the desired U-235 level. This role will continue well into the next century. In addition it provides enriched uranium for US Government needs and for R and D purposes. At the present time, almost all the world's capacity to produce enriched uranium uses the gaseous diffusion process. The United States built the first gaseous diffusion plant during World War II. Later this plant was expanded and two additional plants were built. There is presently a $1.5 billion improvement and uprating program near completion which will improve the plant efficiency and increase the total capacity of the three plants by 60 percent to 27.3 million SWU per year. The Administration's energy message in 1977 provided for a further expansion of this capacity by using gas centrifuge technology. The new gas centrifuge plant is being built near the existing GDP near Portsmouth, Ohio. The normal capacity of an 8 building process plant will be 13.2 million SWU per year. The first 2.2 million SWU of capacity is scheduled to be available in 1989. The remaining capacity will be added as needed to meet demand and the overall goal of the program. The goal of the Uranium Enrichment Program is to meet domestic, foreign, and US Government requirements for uranium enrichment services in an economical, reliable, safe and environmentally acceptable manner. To ensure accomplishment of this goal, the overall program is broken down into three areas of implementation; Enrichment Operations; Capacity Upgrading Operations; and Business Operations

  2. Conception of programs for evaluating balance indices of operation of WWER-440 nuclear power plants

    International Nuclear Information System (INIS)

    Zadrazil, J.

    1986-01-01

    The procedures are discussed of writing computation programs for the evaluation of basic technical and economic parameters of the operation of WWER-440 nuclear power plants. The criterion of the evaluation is the maximum power supply to the grid together with the required supply of heat, with the observance of safe operating conditions. Previous procedures of evaluation are compared with present procedures based on the use of a monitoring and evaluation system of the KOMPLEX-URAN 2 M type. The mathematical model of the program is based on balance equations and relations derived for actual measuring systems and is completed with an assessment of the reliability of input and output data. The flow chart is shown of the algorithm for the evaluation of technical and economic parameters, and methods are suggested for improving and extending the program. (J.C.)

  3. Independent auto evaluation of an operative radiological protection program; Autoevaluacion independiente de un programa de proteccion radiologica operativa

    Energy Technology Data Exchange (ETDEWEB)

    Medrano L, M.A.; Rodriguez C, C.C.; Linares R, D.; Zarate M, N.; Zempoalteca B, R. [Gerencia Subsede Sureste Instituto Nacional de Investigaciones Nucleares, 52045 Ocoyoacac, Estado de Mexico (Mexico)]. e-mail: maam@nuclear.inin.mx

    2006-07-01

    The program of operative radiological protection of a nuclear power plant consists of multiple procedures and associate tasks that have as purpose the radiological protection of the workers of the power station. It is for this reason that the constant evaluation of the one it programs it is an important tool in the identification of their weaknesses (and strengths), so they can be assisted appropriately. In this work the main elements of the program of independent auto evaluation of the program of operative radiological protection of the Laguna Verde Central that has been developed and implemented by the National Institute of Nuclear Research are described. (Author)

  4. Engine Lathe Operator. Instructor's Guide. Part of Single-Tool Skills Program Series. Machine Industries Occupations.

    Science.gov (United States)

    New York State Education Dept., Albany. Bureau of Secondary Curriculum Development.

    Expected to help meet the need for trained operators in metalworking and suitable for use in the adult education programs of school districts, in manpower development and training programs, and in secondary schools, this guide consists of four sections: Introduction, General Job Content, Shop Projects, and Drawings for the Projects. General Job…

  5. Multi-Year Program under Budget Constraints Using Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Surya Adiguna

    2017-09-01

    Full Text Available Road investment appraisal requires joint consideration of multiple criteria which are related to engineering, economic, social and environmental impacts. The investment consideration could be based on the economic analysis but however for some factors, such as environmental, social, and political, are difficult to quantify in monetary term. The multi-criteria analysis is the alternative tool which caters the requirements of the issues above. The research, which is based on 102 class D and class E paved road sections in Kenya, is about to optimize road network investment under budget constraints by applying a multi-criteria analysis (MCA method and compare it with the conventional economic analysis. The MCA is developed from hierarchy structure which is considered as the analytical framework. The framework is based on selected criteria and weights which are assigned from Kenya road policy. The HDM-4 software is applied as decision-making tool to obtain the best investment alternatives and road work programs from both MCA and economic analysis. The road work programs will be the results from the analysis using both MCA and economic analysis within HDM-4 software to see the difference and compare the results between both programs. The results from MCA show 51 road sections need periodic work, which is overlay or resealing. Meanwhile, 51 others need rehabilitation or reconstruction. The five years road work program which based on economic analysis result shows that it costs almost Kenyan Shilling (KES 130 billion to maintain the class D and E paved road in Kenya. Meanwhile, the MCA only requires KES 59.5 billion for 5 years program. These results show huge margin between two analyses and somehow MCA result provides more efficient work program compared to economic analysis.

  6. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  7. Smoking Prevention for Students: Findings From a Three-Year Program of Integrated Harm Minimization School Drug Education.

    Science.gov (United States)

    Midford, Richard; Cahill, Helen; Lester, Leanne; Foxcroft, David R; Ramsden, Robyn; Venning, Lynne

    2016-01-01

    This study investigated the impact of the Drug Education in Victorian Schools (DEVS) program on tobacco smoking. The program taught about licit and illicit drugs in an integrated manner over 2 years, with follow up in the third year. It focused on minimizing harm, rather than achieving abstinence, and employed participatory, critical-thinking and skill-based teaching methods. A cluster-randomized, controlled trial of the program was conducted with a student cohort during years 8 (13 years), 9 (14 years), and 10 (15 years). Twenty-one schools were randomly allocated to the DEVS program (14 schools, n = 1163), or their usual drug education program (7 schools, n = 589). One intervention school withdrew in year two. There was a greater increase in the intervention students' knowledge about drugs, including tobacco, in all 3 years. Intervention students talked more with their parents about smoking at the end of the 3-year program. They recalled receiving more education on smoking in all 3 years. Their consumption of cigarettes had not increased to the same extent as controls at the end of the program. Their change in smoking harms, relative to controls, was positive in all 3 years. There was no difference between groups in the proportionate increase of smokers, or in attitudes towards smoking, at any time. These findings indicate that a school program that teaches about all drugs in an integrated fashion, and focuses on minimizing harm, does not increase initiation into smoking, while providing strategies for reducing consumption and harm to those who choose to smoke.

  8. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  9. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  10. Three-Mile Island Program

    International Nuclear Information System (INIS)

    Malinauskas, A.P.

    1983-01-01

    Activities associated with the Three-Mile Island (TMI) Program were of two types. One involved providing technical review and guidance for specific recovery efforts at TMI, whereas the second was concerned more directly with providing technical assistance to recovery operations through detailed analyses and experimental activities. The work was divided into four elements: Task I - coordination of and participation in the operation of the Technical Advisory Group (TAG) for the cleanup of aqueous streams at TMI; Task II - participation in the Technical Assistance and Advisory Group (TAAG) on TMI operations; Task III - chemical development and other technical support to TMI recovery operations; and Task IV - development of inorganic sorbents for the decontamination of aqueous streams. At the program review that was conducted approximately mid-fiscal year, it was decided to curtail the Task IV activities in favor of studies of more-urgent problems. Technical progress for each of the tasks of this program is presented

  11. Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    2007-03-01

    The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

  12. ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA ECOLOGICAL SERVICES

    2006-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

  13. 7 CFR 761.104 - Developing the farm operating plan.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GENERAL PROGRAM ADMINISTRATION Supervised Credit § 761.104... following priorities: (i) The applicant or borrower's own production records for the previous 3 years; (ii) The per-acre actual production history of the crops produced by the farming operation used to...

  14. The Measurable Benefits of a Workplace Wellness Program in Canada: Results After One Year.

    Science.gov (United States)

    Lowensteyn, Ilka; Berberian, Violette; Belisle, Patrick; DaCosta, Deborah; Joseph, Lawrence; Grover, Steven A

    2018-03-01

    The aim of this study was to evaluate the impact of an employee wellness program in Canada. A comprehensive program including web-based lifestyle challenges was evaluated with annual health screenings. Among 730 eligible employees, 688 (94%) registered for the program, 571 (78%) completed a health screening at baseline, and 314 (43%) at 1 year. Most (66%) employees tracked their activity for more than 6 weeks. At 1-year follow-up, there were significant clinical improvements in systolic blood pressure -3.4 mm Hg, and reductions in poor sleep quality (33% to 28%), high emotional stress (21% to 15%), and fatigue (11% to 6%). A positive dose-response was noted where the greatest improvements were observed among those who participated the most. The program had high employee engagement. After 1 year, the benefits included clinically important improvements in physical and mental health.

  15. Human factors in nuclear power plant operation

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1980-01-01

    An extensive effort is being devoted to developing a comprehensive human factor program that encompasses establishment of a data base for human error prediction using past operation experience in commercial nuclear power plants. Some of the main results of such an effort are reported including data retrieval and classification systems which have been developed to assist in estimation of operator error rates. Also, statistical methods are developed to relate operator error data to reactor type, age, and specific technical design features. Results reported in this paper are based on an analysis of LER's covering a six-year period for LWR's. Developments presently include a computer data management program, statistical model, and detailed error taxonomy

  16. 76 FR 52006 - Announcement of Funding Awards for the Assisted Living Conversion Program; Fiscal Year 2009

    Science.gov (United States)

    2011-08-19

    ... Year 2009 Assisted Living Conversion Program Arizona Phoenix, Kivel Manor, $3,292,367, 15 units... Awards for the Assisted Living Conversion Program; Fiscal Year 2009 AGENCY: Office of the Assistant... funding under the Notice of Funding Availability (NOFA) for the Assisted Living Conversion Program (ALCP...

  17. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  18. The National Astronomy Consortium Summer Student Research Program at NRAO-Socorro: Year 2 structure

    Science.gov (United States)

    Mills, Elisabeth A.; Sheth, Kartik; Giles, Faye; Perez, Laura M.; Arancibia, Demian; Burke-Spolaor, Sarah

    2016-01-01

    I will present a summary of the program structure used for the second year of hosting a summer student research cohort of the National Astronomy Consortium (NAC) at the National Radio Astronomy Observatory in Socorro, NM. The NAC is a program partnering physics and astronomy departments in majority and minority-serving institutions across the country. The primary aim of this program is to support traditionally underrepresented students interested in pursuing a career in STEM through a 9-10 week summer astronomy research project and a year of additional mentoring after they return to their home institution. I will describe the research, professional development, and inclusivity goals of the program, and show how these were used to create a weekly syllabus for the summer. I will also highlight several unique aspects of this program, including the recruitment of remote mentors for students to better balance the gender and racial diversity of available role models for the students, as well as the hosting of a contemporaneous series of visiting diversity speakers. Finally, I will discuss structures for continuing to engage, interact with, and mentor students in the academic year following the summer program. A goal of this work going forward is to be able to make instructional and organizational materials from this program available to other sites interested in joining the NAC or hosting similar programs at their own institution.

  19. Chronic beryllium disease prevention program; worker safety and health program. Final rule.

    Science.gov (United States)

    2006-02-09

    The Department of Energy (DOE) is today publishing a final rule to implement the statutory mandate of section 3173 of the Bob Stump National Defense Authorization Act (NDAA) for Fiscal Year 2003 to establish worker safety and health regulations to govern contractor activities at DOE sites. This program codifies and enhances the worker protection program in operation when the NDAA was enacted.

  20. Fast Flux Test Facility: first three years of operation and future mission

    International Nuclear Information System (INIS)

    Peckinpaugh, C.L.; Newland, D.J.; Evans, E.A.

    1985-03-01

    In summary, the FFTF has proven to be a high performance, versatile test reactor. Results obtained during its first three years of operation - and those to be obtained in the coming years - are building a technology and experience base that is invaluable to future LMRs. The FFTF demonstrates proven LMR technology with a focus for the future and provides the US with international LMR technology leadership