WorldWideScience

Sample records for operator program final

  1. Site operator program final report for fiscal years 1992 through 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1998-01-01

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

  2. 76 FR 37021 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-06-24

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... implement its base Hazardous Waste Management Program. We granted authorization for changes to their program... opportunity to apply for final authorization to operate all aspects of their hazardous waste management...

  3. Chronic beryllium disease prevention program; worker safety and health program. Final rule.

    Science.gov (United States)

    2006-02-09

    The Department of Energy (DOE) is today publishing a final rule to implement the statutory mandate of section 3173 of the Bob Stump National Defense Authorization Act (NDAA) for Fiscal Year 2003 to establish worker safety and health regulations to govern contractor activities at DOE sites. This program codifies and enhances the worker protection program in operation when the NDAA was enacted.

  4. KNK I Test Program, Final Report Part 1

    International Nuclear Information System (INIS)

    Kathol, W.

    1976-01-01

    The compact sodium cooled nuclear reactor KNK I of the Karlsruhe Research Center reached full power for the first time in February 1974. The goal of KNK I is to collect experience for the construction and operation of larger reactors, such as SNR 300. In order to deepen these experiences, a test program was drawn up and conducted from 1973 until 1975 within the framework of R and D work on the development of fast breeder reactors. The program included individual tasks concerning reactor design, safety instrumentation, irradiation and post-examination as well as behavior of components during operation. The performance of the tests was essentially governed by the licensing procedure imposed under the atomic energy act for the construction and operation of nuclear facilities. This report is the first part of the final report of the test program

  5. Dresden 1 plutonium recycle program. Final report

    International Nuclear Information System (INIS)

    Bresnick, S.D.

    1980-01-01

    This is the final report on the Dresden 1 Plutonium Recycle Demonstration Program. It covers the work performed from July 1, 1978 to completion, which includes in-pool inspection of two fuel assemblies, removal of two fuel rods, and post-irradiation examination (PIE) of six fuel rods. Appendix A describes the inspection and rod removal operations, and Appendix B describes the PIE work

  6. Department of Energy Site Operator Program. Final report, October 1, 1991--September 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    York Technical College is a two-year public institution accredited by the Commission of Colleges of the Southern Association of Colleges and Schools. York Technical College has been involved with electric vehicles since the late 1980`s. The four major objectives of the Site Operator Program were (1) field test and evaluate electric and hybrid vehicles and related components; (2) define and develop a national infrastructure system including electric charging systems, service/training education programs, utility system impacts and safety standards; (3) increase public awareness regarding environmental benefits, reduced dependency on foreign oil, technology development, and economic impacts; (4) assist local, state and federal agencies and fleet operators in developing electric and hybrid vehicle programs. The primary thrusts of the electric vehicle program at York Technical College, supporting the objectives of the Site Operator program were: (1) public awareness, (2) public education, (3) EV maintenance curriculum development and maintenance training, (4) field data collection, (5) vehicle modification and upgrade, (6) establish electric vehicle partnerships.

  7. A NEW MUTATION OPERATOR IN GENETIC PROGRAMMING

    Directory of Open Access Journals (Sweden)

    Anuradha Purohit

    2013-01-01

    Full Text Available This paper proposes a new type of mutation operator, FEDS (Fitness, Elitism, Depth, and Size mutation in genetic programming. The concept behind the new mutation operator is inspired from already introduced FEDS crossover operator to handle the problem of code bloating. FEDS mutation operates by using local elitism replacement in combination with depth limit and size of the trees to reduce bloat with a subsequent improvement in the performance of trees (program structures. We have designed a multiclass classifier for some benchmark datasets to test the performance of proposed mutation. The results show that when the initial run uses FEDS crossover and the concluding run uses FEDS mutation, then not only is the final result significantly improved but there is reduction in bloat also.

  8. Operator programs and operator processes

    NARCIS (Netherlands)

    Bergstra, J.A.; Walters, P.

    2003-01-01

    We define a notion of program which is not a computer program but an operator program: a detailed description of actions performed and decisions taken by a human operator (computer user) performing a task to achieve a goal in a simple setting consisting of that user, one or more computers and a

  9. Optimal Operation of Radial Distribution Systems Using Extended Dynamic Programming

    DEFF Research Database (Denmark)

    Lopez, Juan Camilo; Vergara, Pedro P.; Lyra, Christiano

    2018-01-01

    An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation o...... approach is illustrated using real-scale systems and comparisons with commercial programming solvers. Finally, generalizations to consider other EDS operation problems are also discussed.......An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation...... of the EDS by setting the values of the controllable variables at each time period. A suitable definition for the stages of the problem makes it possible to represent the optimal ac power flow of radial EDS as a dynamic programming problem, wherein the 'curse of dimensionality' is a minor concern, since...

  10. 75 FR 81187 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-12-27

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed Rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... Agency (EPA) to authorize states to operate their hazardous waste management programs in lieu of the...

  11. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    International Nuclear Information System (INIS)

    Cohen, Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-01-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O ampersand M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O ampersand M Improvement Program. O ampersand M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O ampersand M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O ampersand M costs was achieved. Based on the lessons learned, an optimum solar- field O ampersand M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O ampersand M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts

  12. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  13. TMI-2 instrumentation and electrical program final evaluation report

    International Nuclear Information System (INIS)

    Mayo, C.W.; Huzdovich, J.W.; Roby, A.R.; Test, L.D.

    1986-11-01

    This report presents the authors collective opinions on the value to the nuclear industry of the various investigations performed at TMI-2 by the Instrumentation and Electrical Program. The authors demonstrate that more attention must be given to the prevention of moisture intrusion during design, construction, operation, and maintenance of a nuclear power plant. They also point out that, while basic engineering designs of instruments are more than adequate, the applications engineering and specifications could be improved. Finally, they show that advanced testing technology, exemplified by the Electrical Circuit Characterization and Diagnostics (ECCAD) System, may be very useful as a diagnostic tool when used as part of the testing or maintenance program in a nuclear power plant

  14. Photovoltaic subsystem marketing and distribution model: programming manual. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-07-01

    Complete documentation of the marketing and distribution (M and D) computer model is provided. The purpose is to estimate the costs of selling and transporting photovoltaic solar energy products from the manufacturer to the final customer. The model adjusts for the inflation and regional differences in marketing and distribution costs. The model consists of three major components: the marketing submodel, the distribution submodel, and the financial submodel. The computer program is explained including the input requirements, output reports, subprograms and operating environment. The program specifications discuss maintaining the validity of the data and potential improvements. An example for a photovoltaic concentrator collector demonstrates the application of the model.

  15. A program for performing angular integrations for transition operators

    International Nuclear Information System (INIS)

    Froese Fischer, C.; Godefroid, M.R.; Hibbert, A.

    1991-01-01

    The MCHF-MLTPOL program performs the angular integrations necessary for expressing the matrix elements of transition operators, E1, E2, ..., or M1, M2, ..., as linear combinations of radial integrals. All matrix elements for transitions between two lists of configuration states will be evaluated. A limited amount of non-orthogonality is allowed between orbitals of the initial and final state. (orig.)

  16. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    Science.gov (United States)

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  17. Operating experience and corrective action program at Ontario Hydro Nuclear

    International Nuclear Information System (INIS)

    Collingwood, Barry; Turner, David

    1998-01-01

    This is a slide-based talk given at the COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. In the introduction there are presented the operating experience (OPEX) program of OHN, and the OPEX Program Mission, ensuring that the right information gets to the right staff at the right time. The OPEX Processes are analysed. These are: - Internal Corrective Action; - Inter-site Lesson Transfer; - External Lesson Transfer; - External Posting of OHN Events; - Internalizing Operating Experience. Steps in solving the Corrective Action Program are described: - Identify the Problem; - Notify Immediate Supervision/Manager; - Evaluate the Problem; - Correct the Problem; Monitor/Report Status. The Internal Corrective Action is then presented as a flowchart. The internalizing operating experience is presented under three aspects: - Communication; - Interface; - Training. The following items are discussed, respectively: peer meetings, department/section meetings, safety meetings, e-mail folders, newsletters and bulletin boards; work planning, pre-job briefings, supervisors' briefing cards; classroom initial and refresher (case studies), simulator, management courses. A diagram is presented showing the flow and treatment of information within OHN, centered on the weekly screening meetings. Finally, the corrective action processes are depicted in a flowchart and analysed in details

  18. 78 FR 29117 - After Final Consideration Pilot Program 2.0

    Science.gov (United States)

    2013-05-17

    ...] After Final Consideration Pilot Program 2.0 AGENCY: United States Patent and Trademark Office, Commerce... Final Consideration Pilot Program (AFCP) to create the After Final Consideration Pilot Program 2.0 (AFCP....0 to consider the response. If the examiner's consideration of a proper AFCP 2.0 request and...

  19. Operator interface programs for KSTAR operation

    International Nuclear Information System (INIS)

    Lee, Sangil; Park, Mikyung; Park, Jinseop; Na, Hoonkyun; Kwon, M.

    2013-01-01

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system

  20. Operator interface programs for KSTAR operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sangil, E-mail: leesi@nfri.re.kr; Park, Mikyung, E-mail: mkpark@nfri.re.kr; Park, Jinseop, E-mail: linupark@nfri.re.kr; Na, Hoonkyun, E-mail: hkna@nfri.re.kr; Kwon, M., E-mail: kwonm@nfri.re.kr

    2013-11-15

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system.

  1. 50 CFR 253.18 - Program operating guidelines.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Program operating guidelines. 253.18 Section 253.18 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC... Guarantee Program § 253.18 Program operating guidelines. The Division may issue Program operating guidelines...

  2. LOFT Augmented Operator Capability Program

    International Nuclear Information System (INIS)

    Hollenbeck, D.A.; Krantz, E.A.; Hunt, G.L.; Meyer, O.R.

    1980-01-01

    The outline of the LOFT Augmented Operator Capability Program is presented. This program utilizes the LOFT (Loss-of-Fluid Test) reactor facility which is located at the Idaho National Engineering Laboratory and the LOFT operational transient experiment series as a test bed for methods of enhancing the reactor operator's capability for safer operation. The design of an Operational Diagnotics and Display System is presented which was backfit to the existing data acquisition computers. Basic color-graphic displays of the process schematic and trend type are presented. In addition, displays were developed and are presented which represent safety state vector information. A task analysis method was applied to LOFT reactor operating procedures to test its usefulness in defining the operator's information needs and workload

  3. Navy radon assessment and mitigation program: Final report

    International Nuclear Information System (INIS)

    1994-10-01

    This final report encompasses the events from the beginning of the Navy Radon Assessment and Mitigation Program to the closure of the program on October 31, 1994. Included in the report are discussions of the phases of the program including screening, assessment, mitigation, and post-mitigation. The primary discussion involves screening and assessment. The report addresses recommendations made to the Naval Facilities Engineering Command by the Hazardous Waste Remedial Actions Program of Martin Marietta Energy Systems, Inc., and the final decisions that were made. Special emphasis is placed on quality assurance/quality control (QA/QC), since QA/QC was given top priority during the implementation of this program. Included in the discussion on QA/QC are ana overview of the measurement process, positive and negative controls, replicated measurements, and application of chamber exposures to data calibration. The report concludes with a discussion of testing considerations for naval facilities and radon mitigation considerations for the Department of the Navy

  4. State Energy Program Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Office of Building Technology, State and Community Programs

    1999-03-17

    The State Energy Program Operations Manual is a reference tool for the states and the program officials at the U.S. Department of Energy's Office of Building Technology, State and Community Programs and Regional Support Offices as well as State Energy Offices. The Manual contains information needed to apply for and administer the State Energy Program, including program history, application rules and requirements, and program administration and monitoring requirements.

  5. Medicaid program; health care-related taxes. Final rule.

    Science.gov (United States)

    2009-06-30

    This rule finalizes our proposal to delay enforcement of certain clarifications regarding standards for determining hold harmless arrangements in the final rule entitled, "Medicaid Program; Health Care-Related Taxes" from the expiration of a Congressional moratorium on enforcement from July 1, 2009 to June 30, 2010.

  6. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  7. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  8. Innovative Technology Development Program. Final summary report

    International Nuclear Information System (INIS)

    Beller, J.

    1995-08-01

    Through the Office of Technology Development (OTD), the U.S. Department of Energy (DOE) has initiated a national applied research, development, demonstration, testing, and evaluation program, whose goal has been to resolve the major technical issues and rapidly advance technologies for environmental restoration and waste management. The Innovative Technology Development (ITD) Program was established as a part of the DOE, Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E) Program. The plan is part of the DOE's program to restore sites impacted by weapons production and to upgrade future waste management operations. On July 10, 1990, DOE issued a Program Research and Development Announcement (PRDA) through the Idaho Operations Office to solicit private sector help in developing innovative technologies to support DOE's clean-up goals. This report presents summaries of each of the seven projects, which developed and tested the technologies proposed by the seven private contractors selected through the PRDA process

  9. NCSU reactor sharing program. Final technical report

    International Nuclear Information System (INIS)

    Perez, P.B.

    1997-01-01

    The Nuclear Reactor Program at North Carolina State University provides the PULSTAR Research Reactor and associated facilities to eligible institutions with support, in part, from the Department of Energy Reactor Sharing Program. Participation in the NCSU Reactor Sharing Program continues to increase steadily with visitors ranging from advance high school physics and chemistry students to Ph.D. level research from neighboring universities. This report is the Final Technical Report for the DOE award reference number DE-FG05-95NE38136 which covers the period September 30, 1995 through September 30, 1996

  10. Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual; FINAL

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1999-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B-Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  11. Final environmental statement, Liquid Metal Fast Breeder Reactor Program. Volume 1

    International Nuclear Information System (INIS)

    1975-12-01

    Information is presented under the following section headings: LMFBR program options and their compatibility with the major issues affecting commercial development, Proposed Final Environmental Statement for the LMFBR program, December 1974, WASH-1535, supplemental material, and material relating to Proposed Final Environmental Statement review

  12. Wilsonville wastewater sampling program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-10-01

    As part of its contrast to design, build and operate the SRC-1 Demonstration Plant in cooperation with the US Department of Energy (DOE), International Coal Refining Company (ICRC) was required to collect and evaluate data related to wastewater streams and wastewater treatment procedures at the SRC-1 Pilot Plant facility. The pilot plant is located at Wilsonville, Alabama and is operated by Catalytic, Inc. under the direction of Southern Company Services. The plant is funded in part by the Electric Power Research Institute and the DOE. ICRC contracted with Catalytic, Inc. to conduct wastewater sampling. Tasks 1 through 5 included sampling and analysis of various wastewater sources and points of different steps in the biological treatment facility at the plant. The sampling program ran from May 1 to July 31, 1982. Also included in the sampling program was the generation and analysis of leachate from SRC product using standard laboratory leaching procedures. For Task 6, available plant wastewater data covering the period from February 1978 to December 1981 was analyzed to gain information that might be useful for a demonstration plant design basis. This report contains a tabulation of the analytical data, a summary tabulation of the historical operating data that was evaluated and comments concerning the data. The procedures used during the sampling program are also documented.

  13. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  14. The Effects of International Operations on the Relationship Between Manufacturing Improvement Programs and Operational Performance

    DEFF Research Database (Denmark)

    Matyusz, Zsolt; Demeter, Krisztina; Boer, Harry

    The link between manufacturing programs and operational performance, and the effects of company internal and external factors on that relationship, are well studied in the literature, both theoretically and empirically. However, previous studies rarely took into account how the scope of operations...... of the business unit affects the relationship between manufacturing programs and performances. We investigate the scope of operations from the manufacturing perspective (i.e. companies that manufacture in only one country have narrow scope of operations, while companies that manufacture in more than one country...... have broad scope of operations). We apply structural equation modelling (SEM) using PLS path modelling to investigate the effect of scope of operations on the relationship between manufacturing improvement programs and operational performance. Manufacturing improvement programs are programs like...

  15. Space Solar Power Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe; Baroud, Michel; Behar, Alberto; Berrier, Keith; Berthe, Phillipe; Bertrand, Reinhold; Bibyk, Irene; Bisson, Joel; Bloch, Lawrence; Bobadilla, Gabriel; Bourque, Denis; Bush, Lawrence; Carandang, Romeo; Chiku, Takemi; Crosby, Norma; De Seixas, Manuel; De Vries, Joha; Doll, Susan; Dufour, Francois; Eckart, Peter; Fahey, Michael; Fenot, Frederic; Foeckersperger, Stefan; Fontaine, Jean-Emmanuel; Fowler, Robert; Frey, Harald; Fujio, Hironobu; Gasa, Jaume Munich; Gleave, Janet; Godoe, Jostein; Green, Iain; Haeberli, Roman; Hanada, Toshiya; Harris, Peter; Hucteau, Mario; Jacobs, Didier Fernand; Johnson, Richard; Kanno, Yoshitsugu; Koenig, Eva Maria; Kojima, Kazuo; Kondepudi, Phani; Kottbauer, Christian; Kulper, Doede; Kulagin, Konstantin; Kumara, Pekka; Kurz, Rainer; Laaksonen, Jyrki; Lang, Andrew Neill; Lathan, Corinna; Le Fur, Thierry; Lewis, David; Louis, Alain; Mori, Takeshi; Morlanes, Juan; Murbach, Marcus; Nagatomo, Hideo; O' brien, Ivan; Paines, Justin; Palaszewski, Bryan; Palmnaes, Ulf; Paraschivolu, Marius; Pathare, Asmin; Perov, Egor; Persson, Jan; Pessoa-Lopes, Isabel; Pinto, Michel; Porro, Irene; Reichert, Michael; Ritt-Fischer, Monika; Roberts, Margaret; Robertson II, Lawrence; Rogers, Keith; Sasaki, Tetsuo; Scire, Francesca; Shibatou, Katsuya; Shirai, Tatsuya; Shiraishi, Atsushi; Soucaille, Jean-Francois; Spivack, Nova; St. Pierre, Dany; Suleman, Afzal; Sullivan, Thomas; Theelen, Bas Johan; Thonstad, Hallvard; Tsuji, Masatoshi; Uchiumi, Masaharu; Vidqvist, Jouni; Warrell, David; Watanabe, Takafumi; Willis, Richard; Wolf, Frank; Yamakawa, Hiroshi; Zhao, Hong

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  16. 42 CFR 51.21 - Contracts for program operations.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contracts for program operations. 51.21 Section 51... APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Program Administration and Priorities § 51.21 Contracts for program operations. (a) An eligible P&A system should work...

  17. Implementation challenges of a motor operated valve program

    International Nuclear Information System (INIS)

    Ferguson, T.L.

    1995-01-01

    Electric motor operated valves (MOVs) have become a global focus of attention for Nuclear Power Plant (NPP) operators due to reported operability problems in the last decade. Many NPPs have or are in the process of setting up maintenance programs to address MOV operability issues. Bruce B is in the initial stages of implementing such a program. This paper outlines some of the challenges that have been encountered and how they are being approached to establish an effective program. (author)

  18. VA Dental Insurance Program--federalism. Direct final rule.

    Science.gov (United States)

    2013-10-22

    The Department of Veterans Affairs (VA) is taking direct final action to amend its regulations related to the VA Dental Insurance Program (VADIP), a pilot program to offer premium-based dental insurance to enrolled veterans and certain survivors and dependents of veterans. Specifically, this rule will add language to clarify the limited preemptive effect of certain criteria in the VADIP regulations.

  19. Research at and Operation of the Materials Science Beamline (X-11) at the National Synchrotron Light Source. Final Report

    International Nuclear Information System (INIS)

    Sayers, Dale E.

    2003-01-01

    This is the final report for DOE DE-FG02-89ER45384. An overview of the operational history and status of beamline X-11A at the end of the contract period, and a brief review of the core science program at NCSU and the scientific results of X-11A since the last progress report is also presented

  20. 47 CFR 76.1710 - Operator interests in video programming.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operator interests in video programming. 76....1710 Operator interests in video programming. (a) Cable operators are required to maintain records in... interests in all video programming services as well as information regarding their carriage of such...

  1. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  2. 75 FR 45563 - Terrorism Risk Insurance Program; Final Netting

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE TREASURY 31 CFR Part 50 RIN 1505-AC24 Terrorism Risk Insurance Program; Final... Title I of the Terrorism Risk Insurance Act of 2002 (``TRIA'' or ``the Act''), as amended by the Terrorism Risk Insurance Extension Act of 2005 (``Extension Act'') and the Terrorism Risk Insurance Program...

  3. Operative Landscape at Canadian Neurosurgery Residency Programs.

    Science.gov (United States)

    Tso, Michael K; Dakson, Ayoub; Ahmed, Syed Uzair; Bigder, Mark; Elliott, Cameron; Guha, Daipayan; Iorio-Morin, Christian; Kameda-Smith, Michelle; Lavergne, Pascal; Makarenko, Serge; Taccone, Michael S; Wang, Bill; Winkler-Schwartz, Alexander; Sankar, Tejas; Christie, Sean D

    2017-07-01

    Background Currently, the literature lacks reliable data regarding operative case volumes at Canadian neurosurgery residency programs. Our objective was to provide a snapshot of the operative landscape in Canadian neurosurgical training using the trainee-led Canadian Neurosurgery Research Collaborative. Anonymized administrative operative data were gathered from each neurosurgery residency program from January 1, 2014, to December 31, 2014. Procedures were broadly classified into cranial, spine, peripheral nerve, and miscellaneous procedures. A number of prespecified subspecialty procedures were recorded. We defined the resident case index as the ratio of the total number of operations to the total number of neurosurgery residents in that program. Resident number included both Canadian medical and international medical graduates, and included residents on the neurosurgery service, off-service, or on leave for research or other personal reasons. Overall, there was an average of 1845 operative cases per neurosurgery residency program. The mean numbers of cranial, spine, peripheral nerve, and miscellaneous procedures were 725, 466, 48, and 193, respectively. The nationwide mean resident case indices for cranial, spine, peripheral nerve, and total procedures were 90, 58, 5, and 196, respectively. There was some variation in the resident case indices for specific subspecialty procedures, with some training programs not performing carotid endarterectomy or endoscopic transsphenoidal procedures. This study presents the breadth of neurosurgical training within Canadian neurosurgery residency programs. These results may help inform the implementation of neurosurgery training as the Royal College of Physicians and Surgeons residency training transitions to a competence-by-design curriculum.

  4. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  5. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) program

    Science.gov (United States)

    1991-09-01

    A program has been proposed to develop the technology and demonstrate the feasibility of a high-temperature particle bed reactor (PBR) propulsion system to be used to power an advanced second stage nuclear rocket engine. The purpose of this Final Environmental Impact Statement (FEIS) is to assess the potential environmental impacts of component development and testing, construction of ground test facilities, and ground testing. Major issues and goals of the program include the achievement and control of predicted nuclear power levels; the development of materials that can withstand the extremely high operating temperatures and hydrogen flow environments; and the reliable control of cryogenic hydrogen and hot gaseous hydrogen propellant. The testing process is designed to minimize radiation exposure to the environment. Environmental impact and mitigation planning are included for the following areas of concern: (1) Population and economy; (2) Land use and infrastructure; (3) Noise; (4) Cultural resources; (5) Safety (non-nuclear); (6) Waste; (7) Topography; (8) Geology; (9) Seismic activity; (10) Water resources; (11) Meteorology/Air quality; (12) Biological resources; (13) Radiological normal operations; (14) Radiological accidents; (15) Soils; and (16) Wildlife habitats.

  6. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  7. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  8. Status of an operating reliability program

    International Nuclear Information System (INIS)

    Johnson, R.A.

    1985-01-01

    This paper deals with productivity improvement programs (PIP) for nuclear generating plants. The PIP was implemented in 1979 as a joint effort between Commonwealth Edison's (CECo's) operating nuclear stations and the Station Nuclear Engineering Department. Goals were set to reduce nonproductivity by 10% over a 5 year period. This goal was accomplished December 31, 1983. Topics of discussion are program method, problem analysis and resolution, program results, program improvements, and proposed additions to the PIP. The program is providing CECo with greater electrical generating productivity

  9. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Etalle, Sandro; Palamidessi, Catuscia

    1999-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  10. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Bossi, Annalisa; Etalle, Sandro; Palamidessi, Catuscia

    2000-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  11. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  12. A reliability program approach to operational safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques is being formulated for potential application in the nuclear power industry. Methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed and a review of current nuclear risk-dominant issues conducted. The need for a reliability approach to address dependent system failures, operating and emergency procedures and human performance, and develop a plant-specific performance data base for safety decision making is demonstrated. Current research has concentrated on developing a Reliability Program approach for the operating phase of a nuclear plant's lifecycle. The approach incorporates performance monitoring and evaluation activities with dedicated tasks that integrate these activities with operation, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the Reliability Program. (orig./HP)

  13. Operations-oriented performance measures for freeway management systems : final report.

    Science.gov (United States)

    2008-12-01

    This report describes the second and final year activities of the project titled Using Operations-Oriented Performance Measures to Support Freeway Management Systems. Work activities included developing a prototype system architecture for testi...

  14. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  15. Reactor operations, inspection and maintenance. PNGS Calibration Program

    International Nuclear Information System (INIS)

    Lopez, E.

    1997-01-01

    The PNGS Calibration Program is being implemented as a response to various concerns identified in recent PEER evaluations and AECB audits. Identified areas of concern were the approach to instrument calibration of Special Safety Systems (SSS). The implementation of a calibration program is a significant improvement in operating practices. A systematic and comprehensive approach to calibration of instrumentation will improve the quality of operation of the plant with a positive contribution to PNGS safety of operation and economic objectives. This paper describes the strategy to implement the proposed calibration program and describes its calibration data requirements. (DM)

  16. 77 FR 15966 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-19

    ... Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Final..., 1989 (54 FR 27170) to implement the RCRA hazardous waste management program. We granted authorization... Combustors; Final Rule, Checklist 198, February 14, 2002 (67 FR 6968); Hazardous Waste Management System...

  17. 78 FR 68161 - Greenhouse Gas Reporting Program: Final Amendments and Confidentiality Determinations for...

    Science.gov (United States)

    2013-11-13

    ... 98 Greenhouse Gas Reporting Program: Final Amendments and Confidentiality Determinations for...-HQ-OAR-2011-0028; FRL-9845-6] RIN 2060-AR61 Greenhouse Gas Reporting Program: Final Amendments and... monitoring methodologies for electronics manufacturers covered by the Greenhouse Gas Reporting Rule. These...

  18. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  19. Program evaluation: Weatherization Residential Assistance Partnership (WRAP) Program. Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-01

    The Connecticut low income weatherization program was developed in response to a 1987 rate docket order from the Connecticut Department of Public Utility Control (DPUC) to Connecticut Light & Power Co., an operating subsidiary of Northeast Utilities (NU). (Throughout this report, NU is referred to as the operator of the program.) This program, known as the Weatherization Residential Assistance Partnership, or WRAP, was configured utilizing input from a collaborative group of interested parties to the docket. It was agreed that this program would be put forth by the electric utility, but would not ignore oil and gas savings (thus, it was to be ``fuel- blind``). The allocated cost of conservation services for each fuel source, however, should be cost effective. It was to be offered to those utility customers at or below 200 percent of the federal poverty levels, and provide a wide array of energy saving measures directed toward heating, water heating and lighting. It was felt by the collaborative group that this program would raise the level of expenditures per participant for weatherization services provided by the state, and by linking to and revising the auditing process for weatherization, would lower the audit unit cost. The program plans ranged from the offering of low-cost heating, water heating and infiltration measures, increased insulation levels, carpentry and plumbing services, to furnace or burner replacement. The program was configured to allow for very comprehensive weatherization and heating system servicing.

  20. Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program

    Science.gov (United States)

    Selwitz, Jason Lawrence

    Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum and course development and evaluation research. First, the context of, and impetus for, what was formerly called vocational education, now referred to as technical or workforce education, is provided. Second, the research that was undertaken to design and evaluate an associate degree-level STEM workforce education program is described. Third, the adaptation of a student self-assessment of learning gains instrument is reviewed, and an analysis of the resulting data using an adapted logic model is provided, to evaluate the extent to which instructional approaches, in two process control/improvement-focused courses, were effective in meeting course-level intended learning outcomes. Finally, eight integrative multiscale exercises were designed from two example process systems, wastewater treatment and fast pyrolysis. The integrative exercises are intended for use as tools to accelerate the formation of an operator-technician's multiscale vision of systems, unit operations, underlying processes, and fundamental reactions relevant to multiple industries. Community and technical colleges serve a vital function in STEM education by training workers for medium- and high-skilled technical careers and providing employers the labor necessary to operate and maintain thriving business ventures. Through development of the curricular, course, and assessment-related instruments and tools, this research helps ensure associate degree-level technical education programs can engage in a continual process of program evaluation and improvement.

  1. Atlantic Richfield Hanford Company chemical operator training program

    International Nuclear Information System (INIS)

    Zumhoff, R.G.

    1975-01-01

    Formal training and testing of Chemical Operators at Hanford were initiated as part of a negotiated union settlement in 1966. Consequently, it was agreed that 25 percent of the chemical operator force would receive a higher rated job (Lead Nuclear Chemical Operator) provided they satisfactorily completed a training program including testing. The training and testing program was developed in two parts. The first covered subjects of a general nature and was applicable to an operator's duties no matter what the assignment. Part II was more specifically oriented to the presently assigned work area. Renewed interest in retraining and requalification of all chemical operators was taken in 1971. This evolved from a Company concern that a program be developed to assure the fact that operators were qualified to do their assigned jobs, and an Atomic Energy Commission request for an outline of a retraining and requalification program for chemical operators. Building upon the experience gained in the LNCO (Lead Nuclear Chemical Operator) program, the two part format is retained. The use of video tapes is used to complement the manuals. An arrangement where an operator can view a lecture-type presentation is provided in seven plant locations. A small studio for in-house production of the video tapes is available to the training Specialists. A script is developed from a training manual by condensing the information into 20-minute presentations. A prime objective of each tape is to highlight the safety and control aspects that accompany operator responsibilities in each of these areas. Testing is also handled on a two part basis; one test covers the fundamentals and a separate test is designed for each of the plant subjects. A walk-through examination is also performed for the plant portion. Operators are required to be requalified on emergency procedures on an annual basis and at two-year intervals in the other areas. (U.S.)

  2. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  3. Integrated initial training program for a CEGB operations engineer

    International Nuclear Information System (INIS)

    Tompsett, P.A.

    1987-01-01

    This paper considers the overall training programs undertaken by a newly appointed Operations Engineer at one of the Central Electricity Generating Board's (CEGB) Advanced Gas Cooled Reactor (AGR) nuclear power stations. The training program is designed to equip him with the skills and knowledge necessary for him to discharge his duties safely and effectively. In order to assist the learning process and achieve and integrated program, aspects of reactor technology and operation, initially the subject of theoretical presentations at the CEGB's Nuclear Power Training Center (NPTC) are reinforced by either simulation and/or practical experience on site. In the later stages plant-specific simulators, operated by trained tutors, are incorporated into the training program to provide the trainee with practical experience of plant operation. The trainee's performance is assessed throughout the program to provide feedback to the trainee, the trainers and station management

  4. 75 FR 53786 - Senior Community Service Employment Program; Final Rule

    Science.gov (United States)

    2010-09-01

    ... Part IV Department of Labor Employment and Training Administration 20 CFR Part 641 Senior... Administration 20 CFR Part 641 RIN 1205-AB48 and RIN 1205-AB47 Senior Community Service Employment Program; Final... implement changes in the Senior Community Service Employment Program (SCSEP) resulting from the 2006...

  5. Operating and Assurance Program Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  6. Canadian fuel development program and recent operational experience

    International Nuclear Information System (INIS)

    Cox, D.S.; Kohn, E.; Lau, J.H.K.; Dicke, G.J.; Macici, N.N.; Sancton, R.W.

    1995-01-01

    This paper provides an overview of the current Canadian CANDU fuel R and D programs and operational experience. The details of operational experience for fuel in Canadian reactors are summarized for the period 1991-1994; excellent fuel performance has been sustained, with steady-state bundle defect rates currently as low as 0.02%. The status of introducing long 37-element bundles, and bundles with rounded bearing pads is reviewed. These minor changes in fuel design have been selectively introduced in response to operational constraints (end-plate cracking and pressure-tube fretting) at Ontario Hydro's Bruce-B and Darlington stations. The R and D programs are generating a more complete understanding of CANDU fuel behaviour, while the CANDU Owners Group (COG) Fuel Technology Program is being re-aligned to a more exclusive focus on the needs of operating stations. Technical highlights and realized benefits from the COG program are summarized. Re-organization of AECL to provide a one-company focus, with an outward looking view to new CANDU markets, has strengthened R and D in advanced fuel cycles. Progress in AECL's key fuel cycle programs is also summarized. (author)

  7. A Monte Carlo program for generating hadronic final states

    International Nuclear Information System (INIS)

    Angelini, L.; Pellicoro, M.; Nitti, L.; Preparata, G.; Valenti, G.

    1991-01-01

    FIRST is a computer program to generate final states from high energy hadronic interactions using the Monte Carlo technique. It is based on a theoretical model in which the high degree of universality in such interactions is related with the existence of highly excited quark-antiquark bound states, called fire-strings. The program handles the decay of both fire-strings and unstable particles produced in the intermediate states. (orig.)

  8. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This three-volume report is responsive to the requirements of Contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program of computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. This section of the three volume report is a final report appendix with information on the National Energy Peak Leveling Program (NEPLP).

  9. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  10. Achieving High Reliability Operations Through Multi-Program Integration

    Energy Technology Data Exchange (ETDEWEB)

    Holly M. Ashley; Ronald K. Farris; Robert E. Richards

    2009-04-01

    Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INL’s primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

  11. NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)

    Energy Technology Data Exchange (ETDEWEB)

    Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad; Gehrig, Bruce; Lu, Na

    2012-12-31

    The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department of Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following

  12. Relaxed Operational Semantics of Concurrent Programming Languages

    Directory of Open Access Journals (Sweden)

    Gustavo Petri

    2012-08-01

    Full Text Available We propose a novel, operational framework to formally describe the semantics of concurrent programs running within the context of a relaxed memory model. Our framework features a "temporary store" where the memory operations issued by the threads are recorded, in program order. A memory model then specifies the conditions under which a pending operation from this sequence is allowed to be globally performed, possibly out of order. The memory model also involves a "write grain," accounting for architectures where a thread may read a write that is not yet globally visible. Our formal model is supported by a software simulator, allowing us to run litmus tests in our semantics.

  13. Allied-General operator training program

    International Nuclear Information System (INIS)

    Ayers, A.L.; Ebel, P.E.

    1975-01-01

    All operators at Allied-General Nuclear Services are initially trained in the basic concepts of radiation and radiation protection, they are drilled in the basic technical tools needed for further training, they are instructed in the design and operation of the Barnwell Nuclear Fuel Plant, and they are introduced to the actual operations via operating procedures. This all occurs during the Before-the-Baseline training phase and then the operators move on Beyond-the-Baseline. There they physically learn how to do their job at their own pace using checklists as a guide. All operators are then internally certified. Progression is based on demonstrated ability and those that qualify go on to jobs requiring NRC licenses. Upon internal certification, retraining commences immediately and will continue in its four month, one year, and two year cycles. Current feedback from the various classes that have completed the courses and are now in the retraining program indicates that this combination of initial technical training, on-the-job training, and retraining will produce and maintain effective, safe, and efficient operators

  14. Oldman River Dam wildlife habitat mitigation program, Pincher Creek, Alberta: Final report. Summary of the implementation phase, 1987--1993

    International Nuclear Information System (INIS)

    1998-01-01

    This article summarizes the 1987--1993 implementation phase of the Oldman River Dam Wildlife Habitat Mitigation Program, intended to offset the negative impact of dam construction and operation on plant and animal species. Projects carried out during the program included creation of wetlands, tree and shrub planting, installation of snow and wildlife fences, and installation of replacement nesting sites for birds. Summaries are provided of the process that led to the final program design, the projects undertaken to complete the program, the design strategies, and the proposed habitat mitigation projects. Also included are an inventory of completed projects, an evaluation of the program's success in meeting its objectives and of the mitigation techniques used in the program, and a recommended strategy for future management of the program. Appendices include habitat suitability index models, summaries of related reports, vegetation maps, and a grazing management plan

  15. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  16. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  17. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  18. 78 FR 70255 - West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-11-25

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R03-RCRA-2013-0571; FRL-9903-07-Region 3] West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY... final authorization of revisions to its hazardous waste program under the Resource Conservation and...

  19. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  20. 76 FR 6594 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S...

  1. 77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...

  2. Survey of foreign reactor operator qualifications, training, and staffing requirements. Final report

    International Nuclear Information System (INIS)

    Au, M.L.; DiSalvo, R.; Merschoff, E.

    1982-05-01

    The report is a compilation of the data obtained from a survey of foreign nuclear power plant operator requirements. Included among the considerations are: (1) shift staffing; (2) operator eligibility; (3) operator training programs; (4) operator licensing or certification; and (5) operator retraining. The data obtained from this survey are presented in matrix form and contrasted with U.S. requirements

  3. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

    1996-08-01

    Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

  4. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  5. Operational budgeting using fuzzy goal programming

    OpenAIRE

    Saeed Mohammadi; Kamran Feizi; Ali Khatami Firouz Abadi

    2013-01-01

    Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate oper...

  6. Astronaut John Young during final suiting operations for Apollo 10 mission

    Science.gov (United States)

    1969-01-01

    A technician attaches hose from test stand to spacesuit of Astronaut John W. Young, Apollo 10 command module pilot, during final suiting operations for the Apollo 10 lunar orbit mission. Another technician makes adjustment behind Young.

  7. 75 FR 50932 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-08-18

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...-1990. FOR FURTHER INFORMATION CONTACT: Robin Biscaia, RCRA Waste Management Section, Office of Site... final [[Page 50933

  8. Studying Operation Rules of Cascade Reservoirs Based on Multi-Dimensional Dynamics Programming

    Directory of Open Access Journals (Sweden)

    Zhiqiang Jiang

    2017-12-01

    Full Text Available Although many optimization models and methods are applied to the optimization of reservoir operation at present, the optimal operation decision that is made through these models and methods is just a retrospective review. Due to the limitation of hydrological prediction accuracy, it is practical and feasible to obtain the suboptimal or satisfactory solution by the established operation rules in the actual reservoir operation, especially for the mid- and long-term operation. In order to obtain the optimized sample data with global optimality; and make the extracted operation rules more reasonable and reliable, this paper presents the multi-dimensional dynamic programming model of the optimal joint operation of cascade reservoirs and provides the corresponding recursive equation and the specific solving steps. Taking Li Xianjiang cascade reservoirs as a case study, seven uncertain problems in the whole operation period of the cascade reservoirs are summarized after a detailed analysis to the obtained optimal sample data, and two sub-models are put forward to solve these uncertain problems. Finally, by dividing the whole operation period into four characteristic sections, this paper extracts the operation rules of each reservoir for each section respectively. When compared the simulation results of the extracted operation rules with the conventional joint operation method; the result indicates that the power generation of the obtained rules has a certain degree of improvement both in inspection years and typical years (i.e., wet year; normal year and dry year. So, the rationality and effectiveness of the extracted operation rules are verified by the comparative analysis.

  9. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    Science.gov (United States)

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  10. 83-inch cyclotron research program. Final report

    International Nuclear Information System (INIS)

    Parkinson, W.C.

    1983-07-01

    In June of 1960 the US Atomic Energy Commission authorized the construction of a modern variable energy cyclotron facility at The University of Michigan to be used for research in nuclear spectroscopy. The Legislature of the State of Michigan made available funds for construction of a building to house the 83-inch cyclotron and auxiliary equipment as well as the University's remodeled 42-inch cyclotron. The research program centered around the 83-inch cyclotron was funded by the AEC and its successors, the Energy Research and Development Administration (ERDA) and the Department of Energy (DOE), from September 1964 through March 1977. The program represented a continuation of the research effort using the 42-inch cyclotron facility which had been supported continuously by the AEC since February 1950. This final report to DOE briefly describes the research facility, the research program, and highlights the principal accomplishments of the effort. It begins with a historical note to place this effort within the context of nuclear physics research in the Department of Physics of the University of Michigan

  11. Environmental program with operational cases to reduce risk to the marine environment significantly

    International Nuclear Information System (INIS)

    Cline, J.T.; Forde, R.

    1991-01-01

    In this paper Amoco Norway Oil Company's environmental program is detailed, followed by example operational programs and achievements aimed to minimize environmental risks to the marine environment at Valhall platform. With a corporate goal to be a leader in protecting the environment, the appropriate strategies and policies that form the basis of the environmental management system are incorporated in the quality assurance programs. Also, included in the program are necessary organizational structures, responsibilities of environmental affairs and line organization personnel, compliance procedures and a waste task force obliged to implement operations improvements. An internal environmental audit system has been initiated, in addition to corporate level audits, which, when communicated to the line organization closes the environmental management loop through experience feed back. Environmental projects underway are significantly decreasing the extent and/or risk of pollution from offshore activities. The cradle to grave responsibility is assumed with waste separated offshore and onshore followed by disposal in audited sites. A $5 MM program is underway to control produced oily solids and reduce oil in produced water aiming to less than 20 ppm. When oil-based mud is used in deeper hole sections, drill solids disposed at sea average less than 60 g oil/kg dry cuttings using appropriate shaker screens, and a washing/centrifuge system to remove fines. Certain oily liquid wastes are being injected down hole whereas previously they were burned using a mud burner. Finally, a program is underway with a goal to eliminate sea discharge of oil on cuttings through injection disposal of oily wastes, drilling with alternative muds such as a cationic water base mud, and/or proper onshore disposal of oily wastes

  12. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  13. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  14. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  15. African Social Studies Program-1, 1988-89. Final Report. A Master's Degree Program for African Social Studies Leaders.

    Science.gov (United States)

    Indiana Univ., Bloomington.

    This paper presents the final report on a project that brought African social studies education leaders to Indiana University (Bloomington) to take part in a Master's Degree program. The report contains a brief history of the program, a description of the program, a discussion of issues relating to acculturation, an evaluation, a list of…

  16. Electric and Hybrid Vehicle Program: Site Operation Program. Quarterly progress report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.; Bassett, R.R.; Briasco, S. [and others

    1995-12-01

    The Site Operator Program has evolved substantially since its inception in response to the Electric Vehicle Research and Demonstration Act of 1976. In its original form, a commercialization effort was intended but this was not feasible for lack of vehicle suppliers and infrastructure. Nonetheless, with DOE sponsorship and technical participation, a few results (primarily operating experience and data) were forthcoming. The current Program comprises eleven sites and over 200 vehicles, of which about 50 are latest generation vehicles. DOE partially funds the Program participant expenditures and the INEL receives operating and maintenance data for the DOE-owned, and participant-owned or monitored vehicles, as well as Program reports. As noted elsewhere in this report, participants represent several widely differing categories: electric utilities, academic institutions, and federal agencies. While both the utilities and the academic institutions tend to establish beneficial relationships with the industrial community.

  17. 77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...

  18. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  19. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  20. Hawaii alternative fuels utilization program. Phase 3, final report

    Energy Technology Data Exchange (ETDEWEB)

    Kinoshita, C.M.; Staackmann, M.

    1996-08-01

    The Hawaii Alternative Fuels Utilization Program originated as a five-year grant awarded by the US Department of Energy (USDOE) to the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The overall program included research and demonstration efforts aimed at encouraging and sustaining the use of alternative (i.e., substitutes for gasoline and diesel) ground transportation fuels in Hawaii. Originally, research aimed at overcoming technical impediments to the widespread adoption of alternative fuels was an important facet of this program. Demonstration activities centered on the use of methanol-based fuels in alternative fuel vehicles (AFVs). In the present phase, operations were expanded to include flexible fuel vehicles (FFVs) which can operate on M85 or regular unleaded gasoline or any combination of these two fuels. Additional demonstration work was accomplished in attempting to involve other elements of Hawaii in the promotion and use of alcohol fuels for ground transportation in Hawaii.

  1. Limiting conditions for operation relaxation program

    International Nuclear Information System (INIS)

    Merz, J.F.

    1985-01-01

    The purpose of this effort was to assess the impact of system maintenance unavailability on plant risk to provide technical justification for the relaxation of system limiting conditions for operation from three to seven days. The primary goal of the relaxation program is to allow for more thorough equipment maintenance. A potential increase in out-of-service time for a particular outage caused by the performance of more effective repairs will be counterbalanced by a probable decrease in the frequency in the outage rate of a component. Benefits resulting from an increase in allowed outage time include: (a) a potential reduction in total system out-of-service time, (b) a minimization of challenges to plant systems, and (c) a reduction in the number of emergency technical specification change requests. This program therefore offers an opportunity to more effectively manage plant maintenance and operation

  2. 77 FR 61326 - Indiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-10-09

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... RCRA hazardous waste management program. We granted authorization for changes to their program on... 202. Hazardous Waste Management July 30, 2003; 68 329 IAC 3.1-6-2(16); System; Identification and FR...

  3. An influence function method based subsidence prediction program for longwall mining operations in inclined coal seams

    Energy Technology Data Exchange (ETDEWEB)

    Yi Luo; Jian-wei Cheng [West Virginia University, Morgantown, WV (United States). Department of Mining Engineering

    2009-09-15

    The distribution of the final surface subsidence basin induced by longwall operations in inclined coal seam could be significantly different from that in flat coal seam and demands special prediction methods. Though many empirical prediction methods have been developed, these methods are inflexible for varying geological and mining conditions. An influence function method has been developed to take the advantage of its fundamentally sound nature and flexibility. In developing this method, significant modifications have been made to the original Knothe function to produce an asymmetrical influence function. The empirical equations for final subsidence parameters derived from US subsidence data and Chinese empirical values have been incorporated into the mathematical models to improve the prediction accuracy. A corresponding computer program is developed. A number of subsidence cases for longwall mining operations in coal seams with varying inclination angles have been used to demonstrate the applicability of the developed subsidence prediction model. 9 refs., 8 figs.

  4. No. 2 heating oil/propane program. Final report, 1992/93

    Energy Technology Data Exchange (ETDEWEB)

    McBrien, J.

    1993-05-01

    During the 1992--93 heating season, the Massachusetts Division Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy`s (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October, 1992 through March, 1993. This final report begins with an overview of the unique events which had an impact on the petroleum markets prior to and during the reporting period. Next, the report summarizes the results from residential heating oil and propane price surveys conducted by DOER over the 1992--93 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by the EIA and distributed to the states. Finally, the report outlines DOER`s use of the data.

  5. Independent auto evaluation of an operative radiological protection program

    International Nuclear Information System (INIS)

    Medrano L, M.A.; Rodriguez C, C.C.; Linares R, D.; Zarate M, N.; Zempoalteca B, R.

    2006-01-01

    The program of operative radiological protection of a nuclear power plant consists of multiple procedures and associate tasks that have as purpose the radiological protection of the workers of the power station. It is for this reason that the constant evaluation of the one it programs it is an important tool in the identification of their weaknesses (and strengths), so they can be assisted appropriately. In this work the main elements of the program of independent auto evaluation of the program of operative radiological protection of the Laguna Verde Central that has been developed and implemented by the National Institute of Nuclear Research are described. (Author)

  6. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  7. Mobile worksystems for decontamination and decommissioning operations. Final report

    International Nuclear Information System (INIS)

    1997-02-01

    This project is an interdisciplinary effort to develop effective mobile worksystems for decontamination and decommissioning (D ampersand D) of facilities within the DOE Nuclear Weapons Complex. These mobile worksystems will be configured to operate within the environmental and logistical constraints of such facilities and to perform a number of work tasks. Our program is designed to produce a mobile worksystem with capabilities and features that are matched to the particular needs of D ampersand D work by evolving the design through a series of technological developments, performance tests and evaluations. The Phase I effort was based on a robot called the Remote Work Vehicle (RWV) that was previously developed by CMU for use in D ampersand D operations at the Three Mile Island Unit 2 Reactor Building basement. During Phase I of this program, the RWV was rehabilitated and upgraded with contemporary control and user interface technologies and used as a testbed for remote D ampersand D operations. We established a close working relationship with the DOE Robotics Technology Development Program (RTDP). In the second phase, we designed and developed a next generation mobile worksystem, called Rosie, and a semi-automatic task space scene analysis system, called Artisan, using guidance from RTDP. Both systems are designed to work with and complement other RTDP D ampersand D technologies to execute selective equipment removal scenarios in which some part of an apparatus is extricated while minimally disturbing the surrounding objects. RTDP has identified selective equipment removal as a timely D ampersand D mission, one that is particularly relevant during the de-activation and de-inventory stages of facility transitioning as a means to reduce the costs and risks associated with subsequent surveillance and monitoring. In the third phase, we tested and demonstrated core capabilities of Rosie and Artisan; we also implemented modifications and enhancements that improve their

  8. 77 FR 25729 - Notice of Issuance of Final Determination Concerning Certain Agilent Oscilloscopes

    Science.gov (United States)

    2012-05-01

    ..., CBP has concluded in the final determination that for each scenario the assembly and programming... final determination, CBP concluded that, based upon the assembly and programming operations in Singapore... Protection (``CBP'') Regulations (19 C.F.R. Part 177). Under these regulations, which implement Title III of...

  9. Assessment of specialized educational programs for licensed nuclear reactor operators

    International Nuclear Information System (INIS)

    Melber, B.D.; Saari, L.M.; White, A.S.; Geisendorfer, C.L.; Huenefeld, J.C.

    1986-02-01

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation among individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs

  10. Medicare and Medicaid programs; advance directives--HCFA. Final rule.

    Science.gov (United States)

    1995-06-27

    This final rule responds to public comments on the March 6, 1992 interim final rule with comment period that amended the Medicare and Medicaid regulations governing provider agreements and contracts to establish requirements for States, hospitals, nursing facilities, skilled nursing facilities, providers of home health care or personal care services, hospice programs and managed care plans concerning advance directives. An advance directive is a written instruction, such as a living will or durable power of attorney for health care, recognized under State law, relating to the provision of health care when an individual's condition makes him or her unable to express his or her wishes. The intent of the advance directives provisions is to enhance an adult individual's control over medical treatment decisions. This rule confirms the interim final rule with several minor changes based on our review and consideration of public comments.

  11. Evaluating the effectiveness of operator education/training program of Fugen

    International Nuclear Information System (INIS)

    Maeda, Kouichi; Sakruai, Naoto; Nakamura, Shinji

    2003-01-01

    The ATR Fugen determines 'the Operator Education/Training Program' for plant operators to acquire knowledge, technique and skill from the reactor facility, operation and the other nuclear plant technology. This program consists of the On-the-Job Training (OJT), desk education, ETC training, compact simulator FATRAS training, and lectures in external organization. So it provides education/training according to operators' technical level, knowledge, and experience. Fugen is investigating the most suitable training/education based on past training/education experience. (author)

  12. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  13. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  14. Advanced Fuel Cycle Initiative University Fellowship Program. Final Progress Report

    International Nuclear Information System (INIS)

    Dixon, Cathy

    2012-01-01

    2004-2011 Final Report for AFCI University Fellowship Program. The goal of this effort was to be supportive of university students and university programs - particularly those students and programs that will help to strengthen the development of nuclear-related fields. The program also supported the stability of the nuclear infrastructure and developed research partnerships that are helping to enlarge the national nuclear science technology base. In this fellowship program, the U.S. Department of Energy sought master's degree students in nuclear, mechanical, or chemical engineering, engineering/applied physics, physics, chemistry, radiochemistry, or fields of science and engineering applicable to the AFCI/Gen IV/GNEP missions in order to meet future U.S. nuclear program needs. The fellowship program identified candidates and selected full time students of high-caliber who were taking nuclear courses as part of their degree programs. The DOE Academic Program Managers encouraged fellows to pursue summer internships at national laboratories and supported the students with appropriate information so that both the fellows and the nation's nuclear energy objectives were successful.

  15. Programming languages and operating systems used in data base systems

    International Nuclear Information System (INIS)

    Radulescu, T.G.

    1977-06-01

    Some apsects of the use of the programming languages and operating systems in the data base systems are presented. There are four chapters in this paper. In the first chapter we present some generalities about the programming languages. In the second one we describe the use of the programming languages in the data base systems. A classification of the programming languages used in data base systems is presented in the third one. An overview of the operating systems is made in the last chapter. (author)

  16. No. 2 heating oil/propane program 1994--1995. Final report

    International Nuclear Information System (INIS)

    McBrien, J.

    1995-05-01

    During the 1994--95 heating season, the Massachusetts Division of Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy's (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October 1994 through March 1995. This program augmented the existing Massachusetts data collection system and served several important functions. The information helped the federal and state governments respond to consumer, congressional and media inquiries regarding No. 2 oil and propane. The information also provided policy decision-makers with timely, accurate and consistent data to monitor current heating oil and propane markets and develop appropriate state responses when necessary. In addition, the communication network between states and the DOE was strengthened through this program. This final report begins with an overview of the unique events that had an impact on the petroleum markets prior to and during the reporting period. Next, the report summarizes the results from residential heating oil and propane price surveys conducted by DOER over the 1994--95 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by EIA and distributed to the states. Finally, the report outlines DOER's use of the data

  17. Number 2 heating oil/propane program. Final report, 1991/92

    Energy Technology Data Exchange (ETDEWEB)

    McBrien, J.

    1992-06-01

    During the 1991--92 heating season, the Massachusetts Division of Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy`s (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October, 1991 through March, 1992. This final report begins with an overview of the unique events which had an impact on the reporting period. Next, the report summarizes the results from the residential heating oil and propane price surveys conducted by DOER over the 1991--1992 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by the EIA and distributed to the states. Finally, the report outlines DOER`s use of the data and responses to the events which unfolded during the 1991--1992 heating season.

  18. Monitoring of good practices programs and independence for electricity and natural gas system operators. Summary report 2011

    International Nuclear Information System (INIS)

    2012-07-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 7. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2011. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2011 and audits carried out by the CRE services in these companies in 2011. These elements were supplemented and clarified by many exchanges with the operators, in particular during the committee hearings that took place in spring 2012 with each network operator. This report is structured around four cross-cutting themes, supplemented by individual analyses of each operator's situation. The cross-cutting issues address communication and user's awareness of the network operators, the new compliance officer function, TSO certification and, finally, the results of the 'mystery shopper' telephone survey carried out by the CRE. The individual situations analysed were those of the eight DSOs serving over 100,000 customers (ERDF, ES, URM, SRD and Geredis-Deux-Sevres for electricity, GrDF, Regaz-Bordeaux and Reseau GDS for natural gas) and the three TSOs (RTE for electricity and GRTgaz and TIGF for natural gas)

  19. 76 FR 18624 - Research, Technical Assistance and Training Programs: Notice of Final Circular

    Science.gov (United States)

    2011-04-04

    ... to FTA Circular 6100.1D, Research and Technical Assistance Training Program: Application Instructions... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Research, Technical Assistance and Training Programs: Notice of Final Circular AGENCY: Federal Transit Administration (FTA), DOT. ACTION...

  20. 77 FR 47302 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-08-08

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... EPA proposed to authorize South Dakota's State Hazardous waste management Program revisions published... to the hazardous waste program revisions submitted by South Dakota. The Agency published a Proposed...

  1. Now Enhancing Working Skills: The ``NEWS`` Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, A. [Merex Corp. (United States)

    1995-01-23

    In October of 1992, Los Alamos National Laboratory and Merex Corporation began a pilot basic skills program to enhance workers` skills. The program, known as the NEWS (Now Enhancing Working Skills) Program, was implemented by the Training and Development Group of the Human Resources Division. A group of 106 employees known as Radiological Control Technicians (RCTs) from ESH-1 (Environmental, Safety, and Health) were targeted to take mandated DOE (Department of Energy) training. The main goal of the LANL/Merex partnership was to help RCTs prepare for mandated DOE Rad Con training and job performance by improving their information processing and math skills. A second goal of this project was to use the information from this small group to make some predictions about the Laboratory as a whole. This final report contains the description and an appendix for the ``NEWS`` program. The topics in this report include Merex class descriptions, test score results for the MAT, the WAT, the TABE, and Challenge test, a follow-up survey to Merex IPS and math training, student feedback statistics for skills programs, and lessons learned from the program.

  2. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  3. 76 FR 6594 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S. Environmental Protection...

  4. Buildings energy management program workshop design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    This document describes activities undertaken by Honeywell's Energy Resources Center for design and development of the format, content, and materials that were used in conducting 129 one-day energy management workshops for specific commercial business audiences. The Building Energy Management Workshop Program was part of a National Workshop Program that was intended to increase awareness of energy-related issues and to encourage energy-conservation actions on the part of commercial and industrial sectors. The total effort included executive conferences for chief executive officers and other senior management personnel; industrial energy-conservation workshops directed at plant management and engineering personnel; vanpooling workshops designed to inform and encourage business in implementing a vanpooling program for employees; and the building energy-management workshops specifically developed for managers, owners, and operators of office and retail facilities, restaurants, and supermarkets. The total program spanned nearly two years and reached approximately 2,500 participants from all parts of the U.S. A detailed followup evaluation is still being conducted to determine the impact of this program in terms of conservation action undertaken by workshop participants.

  5. Space Shuttle Program (SSP) Dual Docked Operations (DDO)

    Science.gov (United States)

    Sills, Joel W., Jr.; Bruno, Erica E.

    2016-01-01

    This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

  6. 26 CFR 601.803 - Program operations and requirements.

    Science.gov (United States)

    2010-04-01

    ... REVENUE PRACTICE STATEMENT OF PROCEDURAL RULES Tax Counseling for the Elderly § 601.803 Program operations... understanding of Federal tax subjects on which they will provide tax return assistance. Volunteers who do not... individuals involved in the program, to respect the confidentiality of income and financial information known...

  7. 76 FR 18927 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-04-06

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act (``OHWMA'') provides the ODEQ with...

  8. Nye County, Nevada 1992 nuclear waste repository program: Program overview. Final report

    International Nuclear Information System (INIS)

    1998-01-01

    The purpose of this document is to provide an overview of the Nye County FY92 Nuclear Waste Repository Program (Program). Funds to pay for Program costs will come from the Federal Nuclear Waste Fund, which was established under the Nuclear Waste Policy Act of 1982 (NWPA). In early 1983, the Yucca Mountain was identified as a potentially suitable site for the nation's first geologic repository for spent reactor fuel and high-level radioactive waste. Later that year, the Nye County Board of County Commissioners (Board) established the capability to monitor the Federal effort to implement the NWPA and evaluate the potential impacts of repository-related activities on Nye County. Over the last eight years, the County's program has grown in complexity and cost in order to address DOE's evolving site characterization studies, and prepare for the potential for facility construction and operation. Changes were necessary as well, in response to Congress's redirection of the repository program specified in the amendments, to the NWPA approved in 1987. In early FY 1991, the County formally established a project office to plan and implement its program of work. The Repository Project Office's (RPO) mission and functions are provided in Section 2.0. The RPO organization structure is described in Section 3.0

  9. Hood River Production Program Review, Final Report 1991-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Underwood, Keith; Chapman, Colin; Ackerman, Nicklaus

    2003-12-01

    This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.

  10. U.S. DOE Geopressured/Geothermal Program: Final report on well plug and abandonment operations and well site restoration, Louisiana and Texas wells

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-08-30

    Some of the critical operations conducted during the plugging and abandonment of the three producing wells of the U.S. DOE GEOPRESSURED/GEOTHERL PROGRAM were witnessed by D-O-R Engineering personnel. All operations witnessed by D-O-R personnel were in compliance with the respective state regulations and were conducted as per D-O-R's recommendations to the Department of Energy and their prime contractor, EG&G Idaho. It is our belief that competent cement plugs were left in all three wells. The following describes the work actually witnessed by D-O-R personnel.

  11. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  12. 76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-09-14

    ... Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed..., 1989 (54 FR 27170) to implement the RCRA hazardous waste management program. We granted authorization... December 7, 2004. Waste Combustors; Final Rule; Checklist 198. Hazardous Waste Management March 13, 2002...

  13. Consumer-Operated Service Programs: monetary and donated costs and cost-effectiveness.

    Science.gov (United States)

    Yates, Brian T; Mannix, Danyelle; Freed, Michael C; Campbell, Jean; Johnsen, Matthew; Jones, Kristine; Blyler, Crystal R

    2011-01-01

    Examine cost differences between Consumer Operated Service Programs (COSPs) as possibly determined by a) size of program, b) use of volunteers and other donated resources, c) cost-of-living differences between program locales, d) COSP model applied, and e) delivery system used to implement the COSP model. As part of a larger evaluation of COSP, data on operating costs, enrollments, and mobilization of donated resources were collected for eight programs representing three COSP models (drop-in centers, mutual support, and education/advocacy training). Because the 8 programs were operated in geographically diverse areas of the US, costs were examined with and without adjustment for differences in local cost of living. Because some COSPs use volunteers and other donated resources, costs were measured with and without these resources being monetized. Scale of operation also was considered as a mediating variable for differences in program costs. Cost per visit, cost per consumer per quarter, and total program cost were calculated separately for funds spent and for resources donated for each COSP. Differences between COSPs in cost per consumer and cost per visit seem better explained by economies of scale and delivery system used than by cost-of-living differences between program locations or COSP model. Given others' findings that different COSP models produce little variation in service effectiveness, minimize service costs by maximizing scale of operation while using a delivery system that allows staff and facilities resources to be increased or decreased quickly to match number of consumers seeking services.

  14. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  15. International Piping Integrity Research Group (IPIRG) Program. Final report

    International Nuclear Information System (INIS)

    Wilkowski, G.; Schmidt, R.; Scott, P.

    1997-06-01

    This is the final report of the International Piping Integrity Research Group (IPIRG) Program. The IPIRG Program was an international group program managed by the U.S. Nuclear Regulatory Commission and funded by a consortium of organizations from nine nations: Canada, France, Italy, Japan, Sweden, Switzerland, Taiwan, the United Kingdom, and the United States. The program objective was to develop data needed to verify engineering methods for assessing the integrity of circumferentially-cracked nuclear power plant piping. The primary focus was an experimental task that investigated the behavior of circumferentially flawed piping systems subjected to high-rate loadings typical of seismic events. To accomplish these objectives a pipe system fabricated as an expansion loop with over 30 meters of 16-inch diameter pipe and five long radius elbows was constructed. Five dynamic, cyclic, flawed piping experiments were conducted using this facility. This report: (1) provides background information on leak-before-break and flaw evaluation procedures for piping, (2) summarizes technical results of the program, (3) gives a relatively detailed assessment of the results from the pipe fracture experiments and complementary analyses, and (4) summarizes advances in the state-of-the-art of pipe fracture technology resulting from the IPIRG program

  16. International Piping Integrity Research Group (IPIRG) Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wilkowski, G.; Schmidt, R.; Scott, P. [and others

    1997-06-01

    This is the final report of the International Piping Integrity Research Group (IPIRG) Program. The IPIRG Program was an international group program managed by the U.S. Nuclear Regulatory Commission and funded by a consortium of organizations from nine nations: Canada, France, Italy, Japan, Sweden, Switzerland, Taiwan, the United Kingdom, and the United States. The program objective was to develop data needed to verify engineering methods for assessing the integrity of circumferentially-cracked nuclear power plant piping. The primary focus was an experimental task that investigated the behavior of circumferentially flawed piping systems subjected to high-rate loadings typical of seismic events. To accomplish these objectives a pipe system fabricated as an expansion loop with over 30 meters of 16-inch diameter pipe and five long radius elbows was constructed. Five dynamic, cyclic, flawed piping experiments were conducted using this facility. This report: (1) provides background information on leak-before-break and flaw evaluation procedures for piping, (2) summarizes technical results of the program, (3) gives a relatively detailed assessment of the results from the pipe fracture experiments and complementary analyses, and (4) summarizes advances in the state-of-the-art of pipe fracture technology resulting from the IPIRG program.

  17. 77 FR 47797 - Arkansas: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-08-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2010-0307; FRL-9713-2] Arkansas: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  18. 76 FR 19004 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-04-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2010-0307; FRL-9290-9] Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  19. 78 FR 32223 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-29

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2012-0821; 9817-5] Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental Protection Agency (EPA... changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA...

  20. 77 FR 38566 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-06-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA--R06-RCRA-2012-0367; FRL-9692-6] Louisiana: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  1. 78 FR 54200 - Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-09-03

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R03-RCRA-2012-0294; FRL-9900-37-Region3] Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of revisions to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...

  2. 78 FR 25579 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... adopted these requirements by reference at Georgia Hazardous Waste Management Rule 391-3-11-.07(1), EPA... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...

  3. 76 FR 37048 - Louisiana; Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-06-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2010-0307; FRL-9323-8] Louisiana; Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  4. 77 FR 15343 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-03-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2012-0054; FRL-9647-8] Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  5. 76 FR 6564 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ... hazardous pharmaceutical waste to the list of wastes that may be managed under the Universal Waste rule...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  6. File Managing and Program Execution in Web Operating Systems

    OpenAIRE

    Bravetti, Mario

    2010-01-01

    Web Operating Systems can be seen as an extension of traditional Operating Systems where the addresses used to manage files and execute programs (via the basic load/execution mechanism) are extended from local filesystem path-names to URLs. A first consequence is that, similarly as in traditional web technologies, executing a program at a given URL, can be done in two modalities: either the execution is performed client-side at the invoking machine (and relative URL addressing in the executed...

  7. Operating program for an automatic alpha-beta counting system-FAG

    Energy Technology Data Exchange (ETDEWEB)

    German, U; Levinson, L; Shemesh, Y; Peled, O; Weistein, M [Israel Atomic Energy Commission, Beersheba (Israel). Nuclear Research Center-Negev

    1996-12-01

    An alpha and beta counting system - FAG, for planchette samples is operated at the Health Physics department`s laboratory of the NRCN. The system consists of a proportional detector of 8`` diameter operated in coincidence with a guard detector, an automatic sample changer (FAG-FHT770E) and electronics (FAG- FHT1100 digital counter and controller). The original operation mode of the system was based on manual tasks handled by the FHT1100 electronics. Pin option for a basic computer keyboard operation was available too. A computer with appropriate 110 card was connected to the system and a new operating program was developed which enables full automatic control of the various components. The program includes activity calculations and statistical checks as well as data management. The program which was developed enables computer control of all components of the system, based on bi-directional communication. The computer software controls the FHT1100 electronics using the R5232 protocol and the sample changer by an additional 110 card Contec Inodel PIO-48W(PC). The computer controls the whole operation of the system: change of samples, high voltage change, start, stop etc. It handles in the appropriate order the different commands and operates the electronic and mechanic components accordingly (authors).

  8. Operating program for an automatic alpha-beta counting system-FAG

    International Nuclear Information System (INIS)

    German, U.; Levinson, L.; Shemesh, Y.; Peled, O.; Weistein, M.

    1996-01-01

    An alpha and beta counting system - FAG, for planchette samples is operated at the Health Physics department's laboratory of the NRCN. The system consists of a proportional detector of 8'' diameter operated in coincidence with a guard detector, an automatic sample changer (FAG-FHT770E) and electronics (FAG- FHT1100 digital counter and controller). The original operation mode of the system was based on manual tasks handled by the FHT1100 electronics. Pin option for a basic computer keyboard operation was available too. A computer with appropriate 110 card was connected to the system and a new operating program was developed which enables full automatic control of the various components. The program includes activity calculations and statistical checks as well as data management. The program which was developed enables computer control of all components of the system, based on bi-directional communication. The computer software controls the FHT1100 electronics using the R5232 protocol and the sample changer by an additional 110 card Contec Inodel PIO-48W(PC). The computer controls the whole operation of the system: change of samples, high voltage change, start, stop etc. It handles in the appropriate order the different commands and operates the electronic and mechanic components accordingly (authors)

  9. 0 + 5 Vascular Surgery Residents' Operative Experience in General Surgery: An Analysis of Operative Logs from 12 Integrated Programs.

    Science.gov (United States)

    Smith, Brigitte K; Kang, P Chulhi; McAninch, Chris; Leverson, Glen; Sullivan, Sarah; Mitchell, Erica L

    2016-01-01

    Integrated (0 + 5) vascular surgery (VS) residency programs must include 24 months of training in core general surgery. The Accreditation Council for Graduate Medical Education currently does not require specific case numbers in general surgery for 0 + 5 trainees; however, program directors have structured this time to optimize operative experience. The aim of this study is to determine the case volume and type of cases that VS residents are exposed to during their core surgery training. Accreditation council for graduate medical education operative logs for current 0 + 5 VS residents were obtained and retrospectively reviewed to determine general surgery case volume and distribution between open and laparoscopic cases performed. Standard statistical methods were applied. A total of 12 integrated VS residency programs provided operative case logs for current residents. A total of 41 integrated VS residents in clinical years 2 through 5. During the postgraduate year-1 training year, residents participated in significantly more open than laparoscopic general surgery cases (p surgery cases are hernia repair (20%), skin and soft tissue (7.4%), and breast (6.3%). Residents in programs with core surgery over 3 years participated in significantly more general surgery operations compared with residents in programs with core surgery spread out over 4 years (p = 0.035). 0 + 5 VS residents perform significantly more open operations than laparoscopic operations during their core surgery training. The majority of these operations are minor, nonabdominal procedures. The 0 + 5 VS residency program general surgery operative training requirements should be reevaluated and case minimums defined. The general surgery training component of 0 + 5 VS residencies may need to be restructured to meet the needs of current and future trainees. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  10. Planning for a program design for energy environmental analysis. Final report, draft

    Energy Technology Data Exchange (ETDEWEB)

    Denton, J; Saaty, T; Blair, P; Ma, F; Buneman, P

    1976-04-01

    The objective of the work reported here is to assist BER/ERDA in program planning with respect to a regional assessment study program for energy environmental analysis. The focus of the work was to examine the use of operational gaming fof regional assessment studies. Specific concerns were gaming applications (1) in regional assessment or management and direction of regional assessments; (2) for achieving a higher level of public understanding of environmental, health, and safety problems of energy; (3) with respect to the supply of adequately trained manpower for energy; (4) with respect to computational requirements; and (5) with respect to current state-of-the-art in computer simulation. In order to investigate these concerns and examine the feasibility of using operational gaming in a regional assessment study program, a Regional Energy Environment Game (REEG) was designed and implemented on an IBM 370/168 digital computer employing APL (A Programming Language). The applicability of interactive operational gaming has been demonstrated by the REEG as applied to a region consisting of Delaware, Maryland, New Jersey, Pennsylvania, and the District of Columbia.

  11. Final Report for the ADMX Phase 2a Project at the University of Washington

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2015-01-01

    This is a final report of the ADMX (Axion Dark Matter eXperiment) Phase 2a program. This program is a project allowing for a sensitive axion dark-matter search at higher axion masses. The Phase 2a program also prepares the project for lower temperature anticipated in later operations. The Phase 2a program includes sensitive data-taking operations at two cavity modes, TM010 and TM020, allowing for faster data-taking operations and extending the search to higher and plausible dark-matter axion masses.

  12. Computerised programming of the Dragon reactor fuel handling operations

    International Nuclear Information System (INIS)

    Butcher, P.

    1976-11-01

    Two suites of FORTRAN IV computer programs have been written to produce check lists for the operation of the two remote control fuel handling machines of the Dragon Reactor. This document describes the advantages of these programs over the previous manual system of writing check lists, and provides a detailed guide to the programs themselves. (author)

  13. An operational health physics quality assurance program

    International Nuclear Information System (INIS)

    Costigan, S.A.; McAtee, J.L. III; Somers, W.M.; Huchton, R.L.

    1996-01-01

    DOE Order 5700.6C, Quality Assurance, stipulates QA requirements for all DOE activities. This order is now codified as 10CFR830.120, Nuclear Safety Management, Quality Assurance Requirements, which is applicable to DOE nuclear facilities. A Quality Assurance Management Plan (QAMP) was developed by the Health Physics Operations Group (ESH-1) at Los Alamos National Laboratory (LANL). The goal of the ESH-1 QAMP is to ensure that operational radiation protection activities meet the criteria outlined in DOE Order 5700.6C, DOE-ER-STD-6001-92 and 10CFR830.120. The ten required elements are QA Program, Personal Training and Qualifications, Quality Improvement, Documents and Records, Work Processes, Design, Procurement, Inspection and Acceptance Testing, Management Assessment and Independent Assessment. The QAMP has been useful for the development of QAMPs at nuclear facilities and has helped ensure uniformity of institutional requirements where Health Physics services are deployed to facilities. To implement a subset of QAMP requirements, a Quality Assurance Self-Evaluation Program (QASE) was established. This program provides a novel self-audit mechanism for the formal identification and correction of non-conforming items related to Operational Health Physics. Additionally, the QASE is a useful management tool for Radiological Control Technician Supervisors and staff and provides a tracking mechanism for ongoing problem areas. Data have been Collected for two calendar years on a number of concerns that fall into four general categories: radiological posting and labeling, instrumentation, monitoring requirements, and radiological documents/records

  14. Preventive maintenance basis: Volume 1 -- Air-operated valves. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This document provides a program of PM tasks suitable for application to Air Operated Valves (AOV's) in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  15. Nature and finality of liability insurance support to nuclear operators

    International Nuclear Information System (INIS)

    Deprimoz, J.

    1975-01-01

    First the specific features of the law originated from the Paris Convention of 1960 is described: strict liability channeled on the operator, the both principles being already underlying in the insurance policies delivered to nuclear operators before their introduction in the internal legislation of the countries that ratified the convention. Then the specific services expected from the liability Insurer are reviewed and the method now prevailing for a rating approach of the risks is analyzed. The new rating techniques that could be justified by speeding up the erection program of nuclear plants through the world are surveyed [fr

  16. Operational experience using the OSTR flip fuel self-protection program

    International Nuclear Information System (INIS)

    Dodd, B.; Ringle, J.C.; Anderson, T.V.; Johnson, A.G.

    1982-01-01

    Recent changes in NRC Physical Security regulations make it highly desirable for a small number of TRIGA research reactor establishments to maintain each of the fuel elements in their reactor core above the self-protection dose rate criterion. OSTR operations personnel have written a computer program (SPOOF) which calculates the exposure rate (in Rhr -1 ) from an irradiated fuel element at 3 feet in air using the actual operating history of the reactor. The purpose of this current paper is to describe the operational experience gained over the last year and a half while using the SPOOF computer program, and while performing the quarterly dose rate measurements needed to confirm the continuing accuracy of the program, and, most importantly, the self-protection status of the OSTR fuel. The computer program in association with the quarterly dose rate measurements have been accepted by the NRC, and allow the OSTR to take credit for self-protecting FLIP fuel under the current physical security regulations

  17. High energy physics program at Texas A&M University. Final report, April 1, 1990--March 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The Texas A&M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R&D program; SSC experimental program; and theoretical physics program.

  18. Integrated plant safety assessment. Systematic evaluation program, Big Rock Point Plant (Docket No. 50-155). Final report

    International Nuclear Information System (INIS)

    1984-05-01

    The Systematic Evaluation Program was initiated in February 1977 by the U.S. Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when the supplement to the Final Integrated Plant Safety Assessment Report has been issued. This report documents the review of the Big Rock Point Plant, which is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. It also addresses a majority of the pending licensing actions for Big Rock Point, which include TMI Action Plan requirements and implementation criteria for resolved generic issues. Equipment and procedural changes have been identified as a result of the review

  19. Operational experience with optical matching in the SLC Final Focus System

    International Nuclear Information System (INIS)

    Bambade, P.; Burchat, P.; Burke, D.

    1989-01-01

    In the SLC Final Focus System, all components of transverse phase-space and the couplings between them must be controlled to minimize the beam size at the interaction point. After summarizing the experimental algorithm and the on-line tuning programs, we present a consistent set of measurements and describe our present understanding of the various contributions to this beam size. 17 refs., 9 figs

  20. Archaeology audit program final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-04-15

    In order to review oil and gas companies' archaeological management systems, the British Columbia Oil and Gas Commission (OGC) introduced its archaeology audit program (AAP) in April 2008. As part of this audit, twenty six oil and gas companies were selected for an office documentation review and a corresponding field audit. This document presented and described these audit results. The purpose of the final audit report was to provide information to assist oil and gas companies to improve their management systems by increasing the emphasis of the preservation of cultural resources. This report presented an overview of the AAP scope and methodology and provided examples from the audit of both good management practices encountered and practices in which opportunities for improvement to archaeological management systems could be implemented. Recommendations to address improvement opportunities were also discussed. It was concluded that the oil and gas companies subject to the audit were found to have met or exceeded OGC expectations for maintaining archaeological management systems. 2 tabs., 7 figs.

  1. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  2. VA Dental Insurance Program--federalism. Direct final rule; confirmation of effective date.

    Science.gov (United States)

    2014-03-20

    The Department of Veterans Affairs (VA) published a direct final rule in the Federal Register on October 22, 2013, amending its regulations related to the VA Dental Insurance Program (VADIP), a pilot program to offer premium-based dental insurance to enrolled veterans and certain survivors and dependents of veterans. Specifically, this rule adds language to clarify the limited preemptive effect of certain criteria in the VADIP regulations. VA received no comments concerning this rule or its companion substantially identical proposed rule published in the Federal Register on October 23, 2013. This document confirms that the direct final rule became effective on December 23, 2013. In a companion document in this issue of the Federal Register, we are withdrawing as unnecessary the proposed rule.

  3. The Role Of Quality Assurance Program For Safety Operation Of Nuclear Installations

    International Nuclear Information System (INIS)

    Harjanto, N.T.; Purwadi, K.P.; Boru, D.S.; Farida; Suharni

    2000-01-01

    Nuclear installations expose potential hazard of radiation, therefore in their construction, operation and maintenance, it is necessary to consider safety aspect, in which the safety requirements which has been determined must be met. One of the requirements that is absolutely needed is quality assurance, which covers arrangement of quality assurance program, organization and administration of the implementation of quality assurance, and supervision. Quality Assurance program is a guideline containing quality policies and basic determination on the realization of activities that effect the quality of equipment's and items used in the operation of nuclear installations in order that the operation of nuclear installation can run safety and in accordance with their design aims and operation limits. Quality Assurance Program includes document control, design control, supply control, control of equipment s and items, operation/process control, inspection and control of equipment test, and control of nonconformance and corrections. General system of nuclear installation operation is equipped with safety and supporting systems. These systems must apply the quality assurance program that cover control of activities in the systems. In the implementation of the quality assurance program, it is necessary to establish procedures, work guidelines/instructions, and quality recording that constitutes documents of quality system 2 nd , 3 th , and 4 th level after the quality assurance program. To ensure the effectivity and to prove whether the realization of the program has been pursuant to the determined requirements, an internal audit must be conducted accordingly

  4. Computer-aided dispatch--traffic management center field operational test : Washington State final report

    Science.gov (United States)

    2006-05-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch - Traffic Management Center Integration Field Operations Test in the State of Washington. The document discusses evaluation findings in the foll...

  5. Operational budgeting using fuzzy goal programming

    Directory of Open Access Journals (Sweden)

    Saeed Mohammadi

    2013-10-01

    Full Text Available Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate operational budget. The proposed model uses fuzzy triangular as well as interval number to estimate budgeting expenses. The proposed study of this paper is implemented for a real-world case study in province of Qom, Iran and the results are analyzed.

  6. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  7. Supplement to Final Environmental Statement related to construction and operation of Clinch River Breeder Reactor Plant, Docket No. 50-537

    International Nuclear Information System (INIS)

    1982-10-01

    In February 1977, the Office of Nuclear Reactor Regulation issued a Final Environmental Statement (FES) (NUREG-0139) related to the construction and operation of the proposed Clinch River Breeder Reactor Plant (CRBRP). Since the FES was issued, additional data relative to the site and its environs have been collected, several modifications have been made to the CRBRP design, and its fuel cycle, and the timing of the plant construction and operation has been affected in accordance with deferments under the DOE Liquid Metal Fast Breeder Reactor (LMFBR) program. These changes are summarized and their environmental significance is assessed in this document. The reader should note that this document generally does not repeat the substantial amount of information in the FES which is still current; hence, the FES should be consulted for a comprehensive understanding of the staff's environmental review of the CRBRP project

  8. ENDF/B-V utility programs: description and operating instructions

    International Nuclear Information System (INIS)

    McLaughlin, K.

    1984-03-01

    A description and operating instructions are supplied for the following ENDF/B-V Processing Programs: CHECKER, CRECT, STNDRD, FIZCON, PSYCHE, RESEND, INTER, INTEND, SUMRIZ, PLOTEF, LSTFCV, RIGEL. These programs can be obtained on magnetic tape, free of charge, from the IAEA Nuclear Data Section. (author)

  9. 78 FR 7816 - Quality Assurance Program Requirements (Operations)

    Science.gov (United States)

    2013-02-04

    ... defined in 10 CFR 50.109 (the Backfit Rule) and is not otherwise inconsistent with the issue finality... or combined licenses. This regulatory guide may be applied to applications for operating licenses and... may access information and comment submissions related to this document, which the NRC possesses and...

  10. 76 FR 23795 - Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date

    Science.gov (United States)

    2011-04-28

    .... 110418247-1247-01] Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date AGENCY... receipt of applications for the Low-Power Television and Translator Upgrade Program (Upgrade Program) will... Rules to Establish Rules for Digital Low Power Television, Television Translator, and Television Booster...

  11. Computing single step operators of logic programming in radial basis function neural networks

    Science.gov (United States)

    Hamadneh, Nawaf; Sathasivam, Saratha; Choon, Ong Hong

    2014-07-01

    Logic programming is the process that leads from an original formulation of a computing problem to executable programs. A normal logic program consists of a finite set of clauses. A valuation I of logic programming is a mapping from ground atoms to false or true. The single step operator of any logic programming is defined as a function (Tp:I→I). Logic programming is well-suited to building the artificial intelligence systems. In this study, we established a new technique to compute the single step operators of logic programming in the radial basis function neural networks. To do that, we proposed a new technique to generate the training data sets of single step operators. The training data sets are used to build the neural networks. We used the recurrent radial basis function neural networks to get to the steady state (the fixed point of the operators). To improve the performance of the neural networks, we used the particle swarm optimization algorithm to train the networks.

  12. Computing single step operators of logic programming in radial basis function neural networks

    Energy Technology Data Exchange (ETDEWEB)

    Hamadneh, Nawaf; Sathasivam, Saratha; Choon, Ong Hong [School of Mathematical Sciences, Universiti Sains Malaysia, 11800 USM, Penang (Malaysia)

    2014-07-10

    Logic programming is the process that leads from an original formulation of a computing problem to executable programs. A normal logic program consists of a finite set of clauses. A valuation I of logic programming is a mapping from ground atoms to false or true. The single step operator of any logic programming is defined as a function (T{sub p}:I→I). Logic programming is well-suited to building the artificial intelligence systems. In this study, we established a new technique to compute the single step operators of logic programming in the radial basis function neural networks. To do that, we proposed a new technique to generate the training data sets of single step operators. The training data sets are used to build the neural networks. We used the recurrent radial basis function neural networks to get to the steady state (the fixed point of the operators). To improve the performance of the neural networks, we used the particle swarm optimization algorithm to train the networks.

  13. Computing single step operators of logic programming in radial basis function neural networks

    International Nuclear Information System (INIS)

    Hamadneh, Nawaf; Sathasivam, Saratha; Choon, Ong Hong

    2014-01-01

    Logic programming is the process that leads from an original formulation of a computing problem to executable programs. A normal logic program consists of a finite set of clauses. A valuation I of logic programming is a mapping from ground atoms to false or true. The single step operator of any logic programming is defined as a function (T p :I→I). Logic programming is well-suited to building the artificial intelligence systems. In this study, we established a new technique to compute the single step operators of logic programming in the radial basis function neural networks. To do that, we proposed a new technique to generate the training data sets of single step operators. The training data sets are used to build the neural networks. We used the recurrent radial basis function neural networks to get to the steady state (the fixed point of the operators). To improve the performance of the neural networks, we used the particle swarm optimization algorithm to train the networks

  14. Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the 2-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These 2 programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  15. 32 CFR 2004.20 - National Industrial Security Program Operating Manual (NISPOM) [201(a)].

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false National Industrial Security Program Operating... Defense INFORMATION SECURITY OVERSIGHT OFFICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NATIONAL INDUSTRIAL SECURITY PROGRAM DIRECTIVE NO. 1 Operations § 2004.20 National Industrial Security Program...

  16. Clinton P. Anderson Meson Physics Facility and its operational safety program

    International Nuclear Information System (INIS)

    Putnam, T.M.

    1975-01-01

    The Clinton P. Anderson Meson Physics Facility (LAMPF) at the Los Alamos Scientific Laboratory consists of/ (1) a medium-energy, high-intensity linear proton accelerator; (2) experimental areas designed to support a multidisciplined program of research and practical applications; and (3) support facilities for accelerator operations and the experimental program. The high-intensity primary and secondary beams at LAMPF and the varied research program create many interesting and challenging problems for the Health Physics staff. A brief overview of LAMPF is presented, and the Operational Safety Program is discussed, with emphasis on the radiological safety and health physics aspects

  17. 78 FR 15299 - New York: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2013-03-11

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... Waste program as addressed by the federal used oil management regulations that were published on..., New York Codes, Rules and Regulations (6 NYCRR), Volume A-2A, Hazardous Waste Management System...

  18. Program-execution in the computer operating-system VORTEX-I

    International Nuclear Information System (INIS)

    Borrmann, H.

    1976-06-01

    Comprehensive German introduction to the structure and operation of a relatively comfortable realtime operating system for process control by VORTEX-I for the V73 of the VARIAN-Company. This is a disc oriented single user system with parallel foreground and background operation. The complete organization of the system-nucleus is described (for input/output exists a separate external report). To the more experienced user of the V73 the existing facilities of interacting with the operating system (operator commands, interrupts and program calls) are exactly described regarding to their internal working. (orig./WB) [de

  19. HERBE final safety report; HERBE Finalni sigurnosni izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The Final safety report of HERBE system constructed at the RB reactor consists of 13 chapters, as follows. Chapter 0 includes a summary and the contents of the Final safety report, fundamental characteristics of the system and conclusion remarks, with the license agreement of the Safety Committee of the Boris Kidric Institute. Chapter 1 describes and analyzes the site of the HERBE system, including demography, topography, meteorology, hydrology, geology, seismicity, ecology. Chapter 3 covers technical characteristics of the system, Chapter 4 deals with safety analysis, Chapter 5 describes organisation of construction and preliminary operational testing of the system. Chapter 6 deals with organisation and program of test and regular operation, relevant procedures. Chapter 7 defines operational conditions and constraints, Chapter 8 and describe methods and means of radiation protection and radioactive materials management respectively. Chapter 10 contains a review of emergency plans, measures and procedures for nuclear accident protection. Chapters 11 and 12 are concerned with quality assurance program and physical protection of the HERBE system and related nuclear material.

  20. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  1. NTC operator training program viewed from SAT-based training process

    International Nuclear Information System (INIS)

    Matsumoto, Yoshio

    1996-01-01

    The Nuclear Power Training Center Ltd. (NTC) was established in June 1972 to train PWR plant operators. Operator training was started in Apr. 1974. Presently we have three full-scope, control-room simulators. Recently IAEA recommended that its Systematic Approach to Training (SAT) be used for the training of NPP personnel. We thoroughly examined the SAT-based process and compared it against the NTC training program. As a result, we have recognized that the NTC training program satisfies the SAT-based training process. We now intend to improve the feedback step of the NTC training system. Our efforts continue to produce a relevant program at the forefront of our profession. (author)

  2. 75 FR 48329 - Tribal Drinking Water Operator Certification Program

    Science.gov (United States)

    2010-08-10

    ... operator has the skills, knowledge, education and experience necessary to deliver safe water supporting... demonstrates the operator has the skills, knowledge, education and experience necessary to deliver safe water... this program can be found at http://www.epa.gov/safewater/tribal.html . 2. Hard Copies. Hard copies of...

  3. Program MASTERCALC: an interactive computer program for radioanalytical computations. Description and operating instructions

    International Nuclear Information System (INIS)

    Goode, W.

    1980-10-01

    MASTERCALC is a computer program written to support radioanalytical computations in the Los Alamos Scientific Laboratory (LASL) Environmental Surveillance Group. Included in the program are routines for gross alpha and beta, 3 H, gross gamma, 90 Sr and alpha spectroscopic determinations. A description of MASTERCALC is presented and its source listing is included. Operating instructions and example computing sessions are given for each type of analysis

  4. Japan-Australia co-operative program on research and development of technology for the management of high level radioactive wastes. Final report 1985 to 1998

    Energy Technology Data Exchange (ETDEWEB)

    Hart, K.; Vance, E.; Lumpkin, G. [Australian Nuclear Science and Technology Organisation, Lucas Heights, NSW (Australia); Mitamura, H.; Banba, T. [Japan Atomic Energy Research Inst. Tokai, Ibaraki (Japan)

    1998-12-01

    The overall aim of the Co-operative Program has been to promote the exchange of information on technology for the management of High-Level Wastes (HLW) and to encourage research and development relevant to such technology. During the 13 years that the Program has been carried out, HLW management strategies have matured and developed internationally, and Japan has commenced construction of a domestic reprocessing and vitrification facility for HLW. The HLW management strategy preferred is a national decision. Many countries are using vitrification, direct disposal of spent fuel or a combination of both to handle their existing wastes whereas others have deferred the decision. The work carried out in the Co-operative Program provides strong scientific evidence that the durability of ceramic waste forms is not significantly affected by radiation damage and that high loadings of actinide elements can be incorporated into specially designed ceramic waste forms. Moreover, natural minerals have been shown to remain as closed systems for U and Th for up to 2.5 b y. All of these results give confidence in the ability of second generation waste forms, such as Synroc, to handle future waste arisings that may not be suitable for vitrification 87 refs., 15 tabs., 22 figs.

  5. Field Operations Program Neighborhood Electric Vehicles - Fleet Survey

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward; Carroll, M.

    2001-07-01

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles(NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog- forming emissions annually.

  6. Field Operations Program - Neighborhood Electric Vehicle Fleet Use

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J. E.; Carroll, M. R.

    2001-07-02

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles (NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog-forming emissions annually.

  7. I-880 Integrated Corridor Management Concept of Operation : Final Submittal: Concept of Operations for the I-880 Corridor in Oakland, California

    Science.gov (United States)

    2008-03-31

    This report describes the draft Concept of Operations that has been developed for the Integrated Corridor Mobility (ICM) program by the I-880 corridor team. The I-880 corridor team has defined this Concept of Operations (ConOps) based on two primary ...

  8. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  9. 76 FR 6561 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... December 31, 1984 (49 FR 48694) to implement its base hazardous waste management program. EPA granted... XV are from the North Carolina Hazardous Waste Management Rules 15A NCAC 13A, effective April 23...

  10. 78 FR 15338 - New York: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-03-11

    ... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R02-RCRA-2013-0144; FRL-9693-3] New York: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...

  11. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  12. Assurance program for remedial action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1985-10-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II language, which is designed to operate using the commercially available dBASE II database software. The paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  13. Assurance Program for Remedial Action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1986-01-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II/sup (b)/ language, which is designed to operate using the commercially available dBASE II database software. This paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  14. Stirling Space Engine Program. Volume 1; Final Report

    Science.gov (United States)

    Dhar, Manmohan

    1999-01-01

    The objective of this program was to develop the technology necessary for operating Stirling power converters in a space environment and to demonstrate this technology in full-scale engine tests. Hardware development focused on the Component Test Power Converter (CTPC), a single cylinder, 12.5-kWe engine. Design parameters for the CTPC were 150 bar operating pressure, 70 Hz frequency, and hot-and cold-end temperatures of 1050 K and 525 K, respectively. The CTPC was also designed for integration with an annular sodium heat pipe at the hot end, which incorporated a unique "Starfish" heater head that eliminated highly stressed brazed or weld joints exposed to liquid metal and used a shaped-tubed electrochemical milling process to achieve precise positional tolerances. Selection of materials that could withstand high operating temperatures with long life were another focus. Significant progress was made in the heater head (Udimet 700 and Inconel 718 and a sodium-filled heat pipe); the alternator (polyimide-coated wire with polyimide adhesive between turns and a polyimide-impregnated fiberglass overwrap and samarium cobalt magnets); and the hydrostatic gas bearings (carbon graphite and aluminum oxide for wear couple surfaces). Tests on the CTPC were performed in three phases: cold end testing (525 K), engine testing with slot radiant heaters, and integrated heat pipe engine system testing. Each test phase was successful, with the integrated engine system demonstrating a power level of 12.5 kWe and an overall efficiency of 22 percent in its maiden test. A 1500-hour endurance test was then successfully completed. These results indicate the significant achievements made by this program that demonstrate the viability of Stirling engine technology for space applications.

  15. Computer programs in BASIC language for atomic absorption flame spectroscopy. Part 1. Operating instructions

    International Nuclear Information System (INIS)

    Boyle, W.G. Jr.

    1977-01-01

    These instructions describe how to use three BASIC language programs to process data from atomic absorption spectrophotometers operated in the flame mode. These programs will also control an automatic sampler if desired. The instructions cover loading the programs, responding to computer prompts, choosing among various options for processing the data, operating the automatic sampler, and producing reports. How the programs differ is also explained. Examples of computer/operator dialogue are presented for typical cases

  16. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Science.gov (United States)

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  17. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  18. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  19. Columbia River system operation review: Final environmental impact statement. Main report

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement

  20. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  1. Computer-aided dispatch--traffic management center field operational test : state of Utah final report

    Science.gov (United States)

    2006-07-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch Traffic Management Center Integration Field Operations Test in the State of Utah. The document discusses evaluation findings in the followin...

  2. 78 FR 45208 - Children's Health Insurance Program (CHIP); Final Allotments to States, the District of Columbia...

    Science.gov (United States)

    2013-07-26

    ... 0938-AR79 Children's Health Insurance Program (CHIP); Final Allotments to States, the District of... and expand health insurance coverage to uninsured, low-income children under the Children's Health...). States may implement the Children's Health Insurance Program (CHIP) through a separate state program...

  3. Final environmental statement for the geothermal leasing program

    Energy Technology Data Exchange (ETDEWEB)

    1973-12-31

    This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

  4. Emergency Management Operations Process Mapping: Public Safety Technical Program Study

    Science.gov (United States)

    2011-02-01

    services Operational Activity Collect and Manage Cash Donations Once activated, refer cash donations to appropriate voluntary organizations...recovery operations. Operational Activity Conduct Euthanasia /Disposal Provide humane methods to euthanize affected animals to stop the spread of the...issue stop movement orders, and initiate animal vaccination and treatment programs, euthanasia efforts, or other protective measures designed to control

  5. AISI Direct Steelmaking Program. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Aukrust, E.

    1994-08-01

    This final report deals with the results of a 5-yr project for developing a more energy-efficient, environmentally friendly, less costly process for producing hot metal than current coke ovens and blast furnaces. In the process, iron ore pellets are smelted in a foamy slag created by reaction of coal char with molten slag to produce CO. The CO further reacts with oxygen, which also reacts with coal volatile matter, to produce the heat necessary to sustain the endothermic reduction reaction. The uncombusted CO and H{sub 2} from the coal are used to preheat and prereduce hematite pellets for the most efficient use of the energy in the coal. Laboratory programs confirmed that the process steps worked. Pilot plant studies were successful. Economic analysis for a 1 million tpy plant is promising.

  6. Medicaid/CHIP Program; Medicaid Program and Children's Health Insurance Program (CHIP); Changes to the Medicaid Eligibility Quality Control and Payment Error Rate Measurement Programs in Response to the Affordable Care Act. Final rule.

    Science.gov (United States)

    2017-07-05

    This final rule updates the Medicaid Eligibility Quality Control (MEQC) and Payment Error Rate Measurement (PERM) programs based on the changes to Medicaid and the Children's Health Insurance Program (CHIP) eligibility under the Patient Protection and Affordable Care Act. This rule also implements various other improvements to the PERM program.

  7. Motor-operated Valve Program at NPP Krsko (NEK) - Status and Overview

    International Nuclear Information System (INIS)

    Nikolic, M; Jagodar, N.; Cerjak, J.; Butkovic, V.

    2002-01-01

    On the basics of US NRC Generic Letter 89-10 Safety-related Motor-operated Valve Testing and Surveillance and subsequent generic letters, Motor-operated Valve (MOV) Program at NEK has been developing. Namely, the holders of nuclear power plant operating licenses has to verify the design basis capability of safety-related e.g. important-to-safety MOVs, as well as to ensure the same for the life of the plant. In light of that, each plant should establish a program to address stressed issues for each program MOV (124 at NEK). Such comprehensive task requires significant effort in many aspects, and basically multidisciplinary skills. NEK MOV Program represents a blend of engineering and in-plant testing, comprised of three phases: Phase I Engineering, Phase II Field Implementation and Phase III Trending. Currently, the program is about the end of Phase I and II, as well as in development of engineering basis for launching Phase III. Overview of the major programmatic issues will be given in this paper along with ongoing activities: testing process, gear-ratio modification, pressure locking/thermal binding susceptibility screening and preventive maintenance. (author)

  8. Summary of LLNL's accomplishments for the FY93 Waste Processing Operations Program

    International Nuclear Information System (INIS)

    Grasz, E.; Domning, E.; Heggins, D.; Huber, L.; Hurd, R.; Martz, H.; Roberson, P.; Wilhelmsen, K.

    1994-04-01

    Under the US Department of Energy's (DOE's) Office of Technology Development (OTD)-Robotic Technology Development Program (RTDP), the Waste Processing Operations (WPO) Program was initiated in FY92 to address the development of automated material handling and automated chemical and physical processing systems for mixed wastes. The Program's mission was to develop a strategy for the treatment of all DOE mixed, low-level, and transuranic wastes. As part of this mission, DOE's Mixed Waste Integrated Program (MWIP) was charged with the development of innovative waste treatment technologies to surmount shortcomings of existing baseline systems. Current technology advancements and applications results from cooperation of private industry, educational institutions, and several national laboratories operated for DOE. This summary document presents the LLNL Environmental Restoration and Waste Management (ER and WM) Automation and Robotics Section's contributions in support of DOE's FY93 WPO Program. This document further describes the technological developments that were integrated in the 1993 Mixed Waste Operations (MWO) Demonstration held at SRTC in November 1993

  9. 78 FR 51737 - Notice of Issuance of Final Determination Concerning Certain Hard Disk Drives and Self-Encrypting...

    Science.gov (United States)

    2013-08-21

    ... the programming operations performed in the United States, using U.S.-origin firmware, substantially... final determination, CBP concluded that, based upon the facts presented, the programming operations... subpart B of part 177 of the U.S. Customs and Border Protection (``CBP'') Regulations (19 C.F.R. Part 177...

  10. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84... and Technical Education Program (NACTEP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order...

  11. Near-term electric vehicle program: Phase I, final report

    Energy Technology Data Exchange (ETDEWEB)

    Rowlett, B. H.; Murry, R.

    1977-08-01

    A final report is given for an Energy Research and Development Administration effort aimed at a preliminary design of an energy-efficient electric commuter car. An electric-powered passenger vehicle using a regenerative power system was designed to meet the near-term ERDA electric automobile goals. The program objectives were to (1) study the parameters that affect vehicle performance, range, and cost; (2) design an entirely new electric vehicle that meets performance and economic requirements; and (3) define a program to develop this vehicle design for production in the early 1980's. The design and performance features of the preliminary (baseline) electric-powered passenger vehicle design are described, including the baseline power system, system performance, economic analysis, reliability and safety, alternate designs and options, development plan, and conclusions and recommendations. All aspects of the baseline design were defined in sufficient detail to verify performance expectations and system feasibility.

  12. 42 CFR 137.138 - Once the Indian Tribe's final offer has been accepted or deemed accepted by operation of law...

    Science.gov (United States)

    2010-10-01

    ... accepted or deemed accepted by operation of law, what is the next step? 137.138 Section 137.138 Public... final offer has been accepted or deemed accepted by operation of law, what is the next step? After the... the acceptance or the deemed acceptance. Rejection of Final Offers ...

  13. The Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the two-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These two programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  14. Conducting an inspection of protection program operations

    International Nuclear Information System (INIS)

    Brown, S.; Howell, J.

    1987-01-01

    Protection Program Operations (PPO) encompasses the entire physical security program at a facility, including security construction and equipment, procedures, forces, management and supervision, and the integration of these elements into a total system. PPO subtopics are Physical Security Systems (PSS), Protection Forces (PF), and System Performance Tests (SPT). PSS assesses those security elements designed to protect security interests, and include sensors, surveillance devices, systems for transmission and integration of alarm and assessment information, barriers, lighting, etc. PF assesses the management, training, equipment and facilities, and skills and knowledge of the protective force. SPT includes Force-on-Force, Emergency Management Performance Test, and Limited Scope Performance Tests

  15. Preventative programs for respiratory disease in cow/calf operations.

    Science.gov (United States)

    Engelken, T J

    1997-11-01

    Control of respiratory disease in cow/calf operations presents many challenges. The incidence of disease in the suckling calf is not well documented and the logistics of handling range animals make control programs difficult to implement. Health programs have to be built around normal working patterns, and these patterns may not provide the best "fit" for immune management of the calf. Weaned calves undergo significant disease challenge when they enter typical marketing channels. This provides the potential for high levels of calf morbidity, mortality, medicine costs, and losses from decreased performance as they arrive at a stocker operation or feedyard. If preweaning calf health and preconditioning programs are used, they must be planned so that the producer has an opportunity to obtain a return on their investment. Options for increasing calf weight marketed, certified calf health sales, or retained ownership through the next phase of production should be evaluated carefully. Any potential increase in calf value must be weighed against program costs. This affords the veterinarian an opportunity to build on traditional disease management and prevention skills and expand their influence in overall ranch management.

  16. Civil Defense, U. S. A.: A Programmed Orientation to Civil Defense. Unit 4. Warning, Emergency Operations, and Support Programs.

    Science.gov (United States)

    Defense Civil Preparedness Agency (DOD), Battle Creek, MI.

    The need for, and a description of, emergency functions required to save lives and protect property in nuclear or natural disasters are presented. Topics discussed include: (1) The Civil Defense Warning System, (2) Introduction to the Emergency Operations Program, (3) Five subprograms of the Emergency Operations Program, (4) Emergency Operations…

  17. 2004 Power marketing program final EIS - final environmental impact statement. Volume 2 - appendices

    International Nuclear Information System (INIS)

    1997-02-01

    This volume contains appendices to the Final Environmental Impact Statement (FEIS) for the Power Marketing Program proposal of the Western Area Power Administration. The FEIS identified peaking power scheduling as the environmentally preferred alternative, and presented the analysis of alternatives and environmental impacts. Sixteen appendices to the FEIS are included in this document. The appendices are: Statutory and Legal Framework; Sierra Nevada Region Customer Groups and Economic Regions; Renewable Technology Cost Information Matrix; Hydrological Assumptions; Recreation Resources; Archaeological and Historical Resources; Incremental Power Resources; Air Quality Regulatory Structure; Energy Generation; Stage Contents Relationships for Regulating Reservoirs; Power Costs; Socioeconomic Impacts; Projected Air Resource Impacts; Land use, Water Quality, and Solid Waste Impact Factors; Draft Environmental Impact Statement Comments and Responses, and Contractor Disclosure Statements. 21 figs., 24 tabs

  18. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  19. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  20. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  1. Organizational Challenge of Posiva’s Final Disposal Programme: From an R&D Organization to a Project Organization, and Further Towards an Operational Organization

    International Nuclear Information System (INIS)

    Mokka, J.

    2016-01-01

    Full text: Posiva Oy is an expert organization established in 1995 and responsible for the final disposal of the spent nuclear fuel of its owners. Posiva currently employs around 100 people and has a turnover of some 63 million (2015). The company headquarters are located in Olkiluoto in the municipality of Eurajoki, Finland. Posiva is owned by two Finnish NPP operators Teollisuuden Voima Oyj (60%) (TVO) and Fortum Power & Heat Oy (40%), both of which are responsible for their costs of nuclear waste management. The Finnish final disposal programme has a long history. When NPP unit Olkiluoto 1 renewed its operating licence for the first time in 1983, TVO presented a programme showing final disposal to commence in the 2020s. In the 1980s and 1990s, the programme concentrated on concept development and site selection activities. After 2003, when Posiva received the decision in principle from the Finnish Government, a new phase began in the programme. Since 2004, Posiva Oy has constructed an underground rock characterization facility on the repository site in Olkiluoto, in western Finland. This facility, called ONKALO, has provided an opportunity to carry out further site investigations, develop construction techniques, and test and demonstrate the engineered barrier system in an actual repository environment. As a result of these investigations and development efforts, the application for a licence to construct the encapsulation plant and the geological repository was submitted in 2012. The Radiation and Nuclear Safety Authority in Finland (STUK) first gave a positive review on the safety of the facility, and consequently the Finnish Government granted the construction licence in November 2015. After receiving the construction licence as the first disposal programme in the world, the next phase in the program will be the construction project of the final disposal facilities required for the disposal operations. A significant first-of-a-kind construction project like

  2. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  3. Columbia River system operation review: Final environmental impact statement. Main report exhibits

    International Nuclear Information System (INIS)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d' Alene tribe

  4. Water Treatment Plant Operation. Volume II. A Field Study Training Program.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  5. Water Treatment Plant Operation. Volume I. A Field Study Training Program.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  6. Final summary report of the Nordic Nuclear Safety Research Program 1994 - 1997

    International Nuclear Information System (INIS)

    Bennerstedt, T.; Lemmens, A.

    1999-11-01

    This is a summary report of the NKS research program carried out 1994 - 1997. It is basically a compilation of the executive summaries of the final reports on the nine scientific projects carried out during that period. It highlights the conclusions, recommendations and other results of the projects. (au)

  7. A Bilevel Programming Model to Optimize Train Operation Based on Satisfaction for an Intercity Rail Line

    Directory of Open Access Journals (Sweden)

    Zhipeng Huang

    2014-01-01

    Full Text Available The passenger travel demands for intercity rail lines fluctuate obviously during different time periods, which makes the rail departments unable to establish an even train operation scheme. This paper considers an optimization problem for train operations which respond to passenger travel demands of different periods in intercity rail lines. A satisfactory function of passenger travelling is proposed by means of analyzing the passengers’ travel choice behavior and correlative influencing factors. On this basis, the paper formulates a bilevel programming model which maximizes interests of railway enterprises and travelling satisfaction of each passenger. The trains operation in different periods can be optimized through upper layer planning of the model, while considering the passenger flow distribution problem based on the Wardrop user equilibrium principle in the lower layer planning. Then, a genetic algorithm is designed according to model features for solving the upper laying. The Frank-Wolfe algorithm is used for solving the lower layer planning. Finally, a numerical example is provided to demonstrate the application of the method proposed in this paper.

  8. Advanced Transport Operating Systems Program

    Science.gov (United States)

    White, John J.

    1990-01-01

    NASA-Langley's Advanced Transport Operating Systems Program employs a heavily instrumented, B 737-100 as its Transport Systems Research Vehicle (TRSV). The TRSV has been used during the demonstration trials of the Time Reference Scanning Beam Microwave Landing System (TRSB MLS), the '4D flight-management' concept, ATC data links, and airborne windshear sensors. The credibility obtainable from successful flight test experiments is often a critical factor in the granting of substantial commitments for commercial implementation by the FAA and industry. In the case of the TRSB MLS, flight test demonstrations were decisive to its selection as the standard landing system by the ICAO.

  9. Program management aid for redundancy selection and operational guidelines

    Science.gov (United States)

    Hodge, P. W.; Davis, W. L.; Frumkin, B.

    1972-01-01

    Although this criterion was developed specifically for use on the shuttle program, it has application to many other multi-missions programs (i.e. aircraft or mechanisms). The methodology employed is directly applicable even if the tools (nomographs and equations) are for mission peculiar cases. The redundancy selection criterion was developed to insure that both the design and operational cost impacts (life cycle costs) were considered in the selection of the quantity of operational redundancy. These tools were developed as aids in expediting the decision process and not intended as the automatic decision maker. This approach to redundancy selection is unique in that it enables a pseudo systems analysis to be performed on an equipment basis without waiting for all designs to be hardened.

  10. Impact of Demand Response Programs on Optimal Operation of Multi-Microgrid System

    Directory of Open Access Journals (Sweden)

    Anh-Duc Nguyen

    2018-06-01

    Full Text Available The increased penetration of renewables is beneficial for power systems but it poses several challenges, i.e., uncertainty in power supply, power quality issues, and other technical problems. Backup generators or storage system have been proposed to solve this problem but there are limitations remaining due to high installation and maintenance cost. Furthermore, peak load is also an issue in the power distribution system. Due to the adjustable characteristics of loads, strategies on demand side such as demand response (DR are more appropriate in order to deal with these challenges. Therefore, this paper studies how DR programs influence the operation of the multi-microgrid (MMG. The implementation is executed based on a hierarchical energy management system (HiEMS including microgrid EMSs (MG-EMSs responsible for local optimization in each MG and community EMS (C-EMS responsible for community optimization in the MMG. Mixed integer linear programming (MILP-based mathematical models are built for MMG optimal operation. Five scenarios consisting of single DR programs and DR groups are tested in an MMG test system to evaluate their impact on MMG operation. Among the five scenarios, some DR programs apply curtailing strategies, resulting in a study about the influence of base load value and curtailable load percentage on the amount of curtailed load and shifted load as well as the operation cost of the MMG. Furthermore, the impact of DR programs on the amount of external and internal trading power in the MMG is also examined. In summary, each individual DR program or group could be handy in certain situations depending on the interest of the MMG such as external trading, self-sufficiency or operation cost minimization.

  11. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  12. Renewable Fuel Pathways II Final Rule to Identify Additional Fuel Pathways under Renewable Fuel Standard Program

    Science.gov (United States)

    This final rule describes EPA’s evaluation of biofuels derived from biogas fuel pathways under the RFS program and other minor amendments related to survey requirements associated with ULSD program and misfueling mitigation regulations for E15.

  13. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  14. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  15. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  16. No. 2 heating oil/propane program. Final report, 1990/91

    Energy Technology Data Exchange (ETDEWEB)

    McBrien, J.

    1991-06-01

    During the 1990/91 heating season, the Massachusetts Division of Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy`s (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October 1990 through March 1991. This final report begins with an overview of the unique events which had an impact on the reporting period. Next, the report summarizes the results from the residential heating oil and propane price surveys conducted by DOER over the 1990/91 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by the EIA and distributed to the states.

  17. Process hazards analysis (PrHA) program, bridging accident analyses and operational safety

    International Nuclear Information System (INIS)

    Richardson, J.A.; McKernan, S.A.; Vigil, M.J.

    2003-01-01

    Recently the Final Safety Analysis Report (FSAR) for the Plutonium Facility at Los Alamos National Laboratory, Technical Area 55 (TA-55) was revised and submitted to the US. Department of Energy (DOE). As a part of this effort, over seventy Process Hazards Analyses (PrHAs) were written and/or revised over the six years prior to the FSAR revision. TA-55 is a research, development, and production nuclear facility that primarily supports US. defense and space programs. Nuclear fuels and material research; material recovery, refining and analyses; and the casting, machining and fabrication of plutonium components are some of the activities conducted at TA-35. These operations involve a wide variety of industrial, chemical and nuclear hazards. Operational personnel along with safety analysts work as a team to prepare the PrHA. PrHAs describe the process; identi fy the hazards; and analyze hazards including determining hazard scenarios, their likelihood, and consequences. In addition, the interaction of the process to facility systems, structures and operational specific protective features are part of the PrHA. This information is rolled-up to determine bounding accidents and mitigating systems and structures. Further detailed accident analysis is performed for the bounding accidents and included in the FSAR. The FSAR is part of the Documented Safety Analysis (DSA) that defines the safety envelope for all facility operations in order to protect the worker, the public, and the environment. The DSA is in compliance with the US. Code of Federal Regulations, 10 CFR 830, Nuclear Safety Management and is approved by DOE. The DSA sets forth the bounding conditions necessary for the safe operation for the facility and is essentially a 'license to operate.' Safely of day-to-day operations is based on Hazard Control Plans (HCPs). Hazards are initially identified in the PrI-IA for the specific operation and act as input to the HCP. Specific protective features important to worker

  18. Environmental program audit: Oak Ridge Gaseous Diffusion Plant, Roane County, Tennessee. Final report

    International Nuclear Information System (INIS)

    Smith, W.M.; Waller, R.

    1985-01-01

    An environmental audit of the Oak Ridge Gaseous Diffusion Plant (ORGDP) was conducted by a team of NUS scientists and engineers during the week of June 3 through June 7, 1985. ORGDP is owned by the Department of Energy and operated by Martin-Marietta Energy Systems, Inc. To enrich uranium feedstocks for nuclear fuels. The team evaluated ORGDP in terms of compliance with environmental regulations and DOE Orders, the adequacy of pollution control equipment, the effectiveness of environmental monitoring, and the application of quality control procedures to environmental programs. The audit was conducted by observing operations, inspecting facilities, evaluating analysis and monitoring techniques, reviewing reports and data, and interviewing personnel. Overall, the ORGDP environmental program appears to be well structured and has attempted to address all areas of air, water, and land media likely to be affected by the operations of the facility. The plant management is knowledgeable about environmental concerns and has established clear, well-defined goals to address these areas. An adequate professional staff is available to manage the environmental program

  19. Flammability Assessment Methodology Program Phase I: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Loehr; S. M. Djordjevic; K. J. Liekhus; M. J. Connolly

    1997-09-01

    The Flammability Assessment Methodology Program (FAMP) was established to investigate the flammability of gas mixtures found in transuranic (TRU) waste containers. The FAMP results provide a basis for increasing the permissible concentrations of flammable volatile organic compounds (VOCs) in TRU waste containers. The FAMP results will be used to modify the ''Safety Analysis Report for the TRUPACT-II Shipping Package'' (TRUPACT-II SARP) upon acceptance of the methodology by the Nuclear Regulatory Commission. Implementation of the methodology would substantially increase the number of drums that can be shipped to the Waste Isolation Pilot Plant (WIPP) without repackaging or treatment. Central to the program was experimental testing and modeling to predict the gas mixture lower explosive limit (MLEL) of gases observed in TRU waste containers. The experimental data supported selection of an MLEL model that was used in constructing screening limits for flammable VOC and flammable gas concentrations. The MLEL values predicted by the model for individual drums will be utilized to assess flammability for drums that do not meet the screening criteria. Finally, the predicted MLEL values will be used to derive acceptable gas generation rates, decay heat limits, and aspiration time requirements for drums that do not pass the screening limits. The results of the program demonstrate that an increased number of waste containers can be shipped to WIPP within the flammability safety envelope established in the TRUPACT-II SARP.

  20. Astron Program final report

    International Nuclear Information System (INIS)

    Briggs, R.J.; Hester, R.E.; Porter, G.D.; Sherwood, W.A.; Spoerlein, R.; Stallard, B.W.; Taska, J.; Weiss, P.B.

    1975-01-01

    This report describes important experimental results obtained in the last two years of the Astron Program, an LLL controlled nuclear fusion program which terminated in 1973. Little theoretical work is included, but an extensive bibliography is given

  1. PLC/DTAM Software Programs for Pumping Instrumentation and Control Skid X

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2001-01-01

    This document describes the software programs for the Allen-Bradley SLC 500 programmable logic controller (PLC) and the Allen-Bradley DTAM PLUS operator interface module used on Pumping Instrumentation and Control (PIC) skid ''X''. The software programs for the SLC 500 and DTAM Plus are based on the core programs provided by Allen-Bradley. The PLC and DTAM software programs on skid ''D'' for SX-104 are the baseline programs. These baselines will be tailored for each individual BY-farm skid. An Acceptance Test Procedure (ATP) and an Operational Test Procedure (OTP) verify that the software programs meet the specific requirements for BY-105 pumping. This document represents the final PLC and DTAM programs for PIC skid ''X'' at BY-105. These programs were printed out after the performance of the OTP. The OTP acts as the final qualification test for the software programs. Functional requirements and details of the PLC ladder logic are described in this document. The final programs entered into the PLC and DTAM Plus are included as Appendices to this document

  2. Space operation system for Chang'E program and its capability ...

    Indian Academy of Sciences (India)

    investment. Due to the constraint in program cost, space operation for China's first lunar exploration program will be provided by the aerospace TT&C network designed for China's manned space pro- gram. The TT&C network consists of a ... foreign spacecrafts and for five spaceships in flight experiments of China's manned ...

  3. 75 FR 35720 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-06-23

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07-1... Courier: Deliver your comments to: Robin Biscaia, RCRA Waste Management Section, Office of Site...

  4. Brayton isotope power system, phase I. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    The Phase I program resulted in the development and ground demonstration of a dynamic power conversion system. The two key contractual objectives of 25% conversion efficiency and 1000 h of endurance testing were successfully met. As a result of the Phase I effort, the BIPS is a viable candidate for further development into a flight system capable of sustained operation in space. It represents the only known dynamic space power system to demonstrate the performance and endurance coupled with the simplicity necessary for reliable operation. This final report follows thirty-five monthly reports. For expediency, it makes liberal use of referenced documents which have been submitted to DOE during the course of the program

  5. The development of natural circulation operation support program for ship nuclear power machinery

    International Nuclear Information System (INIS)

    Hao, Jianli; Chen, Wenzhen; Chen, Zhiyun

    2012-01-01

    Highlights: ► The natural circulation under various ocean and ship motion conditions is studied. ► A natural circulation operation support computer program (NCOSP) is developed with Simulink. ► The NCOSP program has the merit of easy input preparation, fast and accurate simulation. ► The NCOSP is suitable for the fast parameter simulation of ship nuclear power machinery. -- Abstract: The existing simulation program of ship nuclear power machinery (SNPM) cannot adequately deal with the natural circulation (NC) operation and the effects of various ocean conditions and ship motion. Aiming at the problem, the natural circulation operation support computer program for SNPM is developed, in which the momentum conservation equation of the primary loop, some heat transfer and flow resistance models and equations are modified for the various ocean conditions and ship motion. The additional pressure loss model and effective height model for the control volume in the gyration movement, simple harmonic rolling and pitching movements are also discussed in the paper. Furthermore, the transient response to load change under NC conditions is analyzed by the developed program. The results are compared with those predicted by the modified RELAP5/mod3.2 code. It is shown that the natural circulation operation support program (NCOSP) is simple in the input preparation, runs fast and has a satisfactory precision, and is therefore very suitable for the operating field support of SNPM under the conditions of NC.

  6. High energy physics program at Texas A and M University. Final report, April 1, 1995 - March 31, 1996

    International Nuclear Information System (INIS)

    1995-12-01

    The experimental and theoretical high energy physics programs at Texas A ampersand M University have continued their vigorous research activities over the past year. This is the final report on activities which have been supported through DOE grant DE-FG05-91ER40633. This report covers the period January 1, 1995 to December 31, 1995. The project includes a component which has used the Fermilab Tevatron, as part of the Collider Detector (CDF) collaboration. They have been involved in operations and theory work on supersymmetry (SUSY). Another component works with the MACRO experiment at the Gran Sasso Laboratory in l'Aquila, Italy, to study magnetic monopoles, astrophysical neutrinos, and cosmic ray phenomena. A third effort has been involved in developing an Expression of Interest and a Fermilab proposal for a large fine-grained magnetic sampling detector to be used for studying events inducted by accelerator or atmospheric neutrinos as a way to search for neutrino oscillations (MINOS). Finally the theoretical effort has addressed string theory, model building, SUSY phenomenology, astroparticle physics, and brain function and quantum mechanics

  7. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  8. Operation of beam line facilities for real-time x-ray studies at Sector 7 of the advanced photon source. Final Report

    International Nuclear Information System (INIS)

    Clarke, Roy

    2003-01-01

    This Final Report documents the research accomplishments achieved in the first phase of operations of a new Advanced Photon Source beam line (7-ID MHATT-CAT) dedicated to real-time x-ray studies. The period covered by this report covers the establishment of a world-class facility for time-dependent x-ray studies of materials. During this period many new and innovative research programs were initiated at Sector 7 with support of this grant, most notably using a combination of ultrafast lasers and pulsed synchrotron radiation. This work initiated a new frontier of materials research: namely, the study of the dynamics of materials under extreme conditions of high intensity impulsive laser irradiation

  9. Accuracy of pre-operative hysteroscopic guided biopsy for predicting final pathology in uterine malignancies.

    Science.gov (United States)

    Martinelli, Fabio; Ditto, Antonino; Bogani, Giorgio; Signorelli, Mauro; Chiappa, Valentina; Lorusso, Domenica; Haeusler, Edward; Raspagliesi, Francesco

    2017-07-01

    To evaluate concordance (C) between pre-operative hysteroscopic-directed sampling and final pathology in uterine cancers. A retrospective cross-sectional evaluation of prospectively collected data of women who underwent hysterectomy for uterine malignancies and a previous hysteroscopic-guided biopsy was performed. Diagnostic concordance between pre-operative (hysteroscopic biopsy) and postoperative (uterine specimen) histology was evaluated. In endometrioid-endometrial cancers cases Kappa (k) statistics was applied to evaluate agreement for grading (G) between the preoperative and final pathology. A total 101 hysterectomies for uterine malignancies were evaluated. There were 23 non-endometrioid cancers: 7 serous (C:5/7, 71.4%); 10 carcinosarcomas (C:7/10, 70%, remaining 3 cases only epithelial component diagnosed); 3 clear cell (C:3/3, 100%); 3 sarcomas (C:3/3, 100%). In 78 cases an endometrioid endometrial cancer was found. In 63 cases there was a histological C (63/78, 80.8%) between hysteroscopic-guided biopsy and final pathology, while in 15 cases (19.2%) only hyperplasia (with/without atypia) was found preoperatively. Overall accuracy to detect endometrial cancer was 80.2%. In 50 out of 63 endometrial cancers (79.4%) grading was concordant. The overall level of agreement between preoperative and postoperative grading was "substantial" according to Kappa (k) statistics (k 0.64; 95% CI: 0.449-0.83; p < 0.001), as well as for G1 (0.679; 95% CI: 0.432-0.926; p < 0.001) and G3 (0.774; 94% CI: 0.534-1; p < 0.001), while for G2 (0.531; 95% CI: 0.286-0.777; p < 0.001) it was moderate. In our series we found an 80% C between pre-operative hysteroscopic-guided biopsy and final pathology, in uterine malignancies. Moreover, hysteroscopic biopsy accurately predicted endometrial cancer in 80% of cases and "substantially" predicted histological grading. Hysteroscopic-guided uterine sampling could be a useful tool to tailor treatment in patients with uterine

  10. Actinide partitioning-transmutation program final report. III. Transmutation studies

    International Nuclear Information System (INIS)

    Wachter, J.W.; Croff, A.G.

    1980-07-01

    Transmutation of the long-lived nuclides contained in fuel cycle wastes has been suggested as a means of reducing the long-term toxicity of the wastes. A comprehensive program to evaluate the feasibility and incentives for recovering the actinides from wastes (partitioning) and transmuting them to short-lived or stable nuclides has been in progress for 3 years under the direction of Oak Ridge National Laboratory (ORNL). This report constitutes the final assessment of transmutation in support of this program. Included are (1) a summary of recent transmutation literature, (2) a generic evaluation of actinide transmutation in thermal, fast, and other transmutation devices, (3) a preliminary evaluation of 99 Tc and 129 I transmutation, and (4) a characterization of a pressurized-water-reactor fuel cycle with and without provisions for actinide recovery and transmutation for use in other parts of the ORNL program. The principal conclusion of the report is that actinide transmutation is feasible in both thermal and fast reactors, subject to demonstrating satisfactory fuel performance, with relatively little impact on the reactor. It would also appear that additional transmutation studies are unwarranted until a firm decision to proceed with actinide transmutation has been made by the responsible authorities

  11. Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    Science.gov (United States)

    2017-09-29

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), known as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. On August 21, 2017, HHS solicited comments on further delaying the effective date of the January 5, 2017, final rule to July 1, 2018 (82 FR 39553). HHS proposed this action to allow a more deliberate process of considering alternative and supplemental regulatory provisions and to allow for sufficient time for additional rulemaking. After consideration of the comments received on the proposed rule, HHS is delaying the effective date of the January 5, 2017, final rule, to July 1, 2018.

  12. Operator training and the training simulator experience

    International Nuclear Information System (INIS)

    Mills, D.

    The author outlines the approach used by Ontario Hydro to train operators from the day they are hired as Operators-in-Training until they are Authorized Unit First Operators. He describes in detail the use of the simulator in the final year of the authorization program, drawing on experience with the Pickering NGS A simulator. Simulators, he concludes, are important aids to training but by no means all that is required to guarantee capable First Operators

  13. FOCUS: a fire management planning system -- final report

    Science.gov (United States)

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  14. Inpo programs for improvement of nuclear power plant operations

    International Nuclear Information System (INIS)

    Edward Moore, C.

    1989-01-01

    The talk shows how key INPO programs help foster improved nuclear power operations. The talk focuses on the results being seen from six key efforts: evaluations, training and accreditation, assistance, events analysis and information exchange, human performance and maintenance. The talk stresses that all INPO programs are geared toward enhanced performance and that progress in key performance areas since 1980 shows that INPO and U.S. industry efforts are achieving desired results

  15. Active vibration control testing of the SPICES program: final demonstration article

    Science.gov (United States)

    Dunne, James P.; Jacobs, Jack H.

    1996-05-01

    The Synthesis and Processing of Intelligent Cost Effective Structures (SPICES) Program is a partnership program sponsored by the Advanced Research Projects Agency. The mission of the program is to develop cost effective material processing and synthesis technologies to enable new products employing active vibration suppression and control devices to be brought to market. The two year program came to fruition in 1995 through the fabrication of the final smart components and testing of an active plate combined with two trapezoidal rails, forming an active mount. Testing of the SPICES combined active mount took place at McDonnell Douglas facilities in St. Louis, MO, in October-December 1995. Approximately 15 dB reduction in overall response of a motor mounted on the active structure was achieved. Further details and results of the SPICES combined active mount demonstration testing are outlined. Results of numerous damping and control strategies that were developed and employed in the testing are presented, as well as aspects of the design and fabrication of the SPICES active mount components.

  16. Hydrologic resources management program, FY 1998 progress report; FINAL

    International Nuclear Information System (INIS)

    Benedict, F.C.; Criss, R.E.; Davisson, M.L.; Eaton, G.F.; Hudson, G.B.; Kenneally, J.M.; Rose, T.P.; Smith, D.

    1999-01-01

    This report presents the results from FY 1998 technical studies conducted by Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) project. The HRMP is sponsored by Defense Programs (DP) of the U.S. Department of Energy, Nevada Operations Office (DOE/NV), and supports DP operations at the Nevada Test Site (NTS) through studies of radiochemistry and resource management related to the defense programs mission. Other participating organizations include the Los Alamos National Laboratory (LANL), the United States Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the United States Environmental Protection Agency (EPA), and Bechtel-Nevada (BN). The UGTA project is an Environmental Management (EM) activity of DOE/NV that supports a Federal Facilities Agreement and Consent Order between the Department of Energy, the Department of Defense, and the State of Nevada. UGTA's primary function is to address the legacy release of hazardous constituents at the Nevada Test Site, the Tonopah Test Range, and off-Nevada Test Site underground nuclear testing areas. Participating contractors include LLNL (Earth and Environmental Sciences Directorate, Analytical and Nuclear Chemistry Division), LANL, DRI, USGS, BN, HSI-GeoTrans, and IT Corporation. The FY 1998 HRMP and UGTA annual progress report follows the organization and contents of our FY 1997 report (Smith et al., 1998), and includes our results from CY 1997-1998 technical studies of radionuclide migration and isotope hydrology at the Nevada Test Site. During FY 1998, LLNL continued its efforts under the HRMP to pursue a technical agenda relevant to the science-based stockpile stewardship program at DOE/NV. Support to UGTA in FY 1998 included efforts to quantitatively define the radionuclide source term residual from underground nuclear weapons testing and the derivative solution, or hydrologic source

  17. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and... Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.259A... Technical Education Program (NHCTEP), the Secretary hereby waives 34 CFR 75.261(c)(2) in order to extend the...

  18. 25 CFR 39.137 - May schools operate a language development program without a specific appropriation from Congress?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false May schools operate a language development program... Formula Language Development Programs § 39.137 May schools operate a language development program without a specific appropriation from Congress? Yes, a school may operate a language development program...

  19. Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts contained in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.

  20. Final environmental statement related to the operation of Clinton Power Station, Unit No. 1. Docket No. 50-461

    International Nuclear Information System (INIS)

    1982-05-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Clinton Power Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and ridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to Lake Clinton and Salt Creek are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The hydrothermal analyses indicate that under certain meteorological conditions (1-in-50-year drought), the plant would have to be operated at reduced power levels in order to meet the thermal standards established by the Illinois Pollution Control Board Order PCB 81-82. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilties should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. Contentions associated with environmental issues accepted during the operating-license hearing are related to assessment of effects of low-level radiation. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of Clinton

  1. Final examination of trainees for nuclear power plant operators at an education and training centre

    International Nuclear Information System (INIS)

    Gieci, A.

    1986-01-01

    General and specialized theoretical training, on-the-job training in the training power plant and simulator training is followed by a final examination. The examination which is obligatory for all trainees is conceived according to Hick's law which requires linear dependence between the time which the operator needs for taking a decision on how to cope with a certain situation and the measure of entropy of the situation. Research in the field of man-machine relations has helped clarify the thinking of the operator who on the basis of received signals forms what is termed the conceptual model of the situation. The final examination should assess the trainee's ability to form conceptual models - the examination must therefore be something more than just a test of knowledge. The given questions and required answers must create a stress situation for the examinee such that the measure to which he is able to cope is conditioned by his ability to form conceptual models. The statutes of the final examinations were drawn up with the aim of achieving standardization and reproducibility. Questions are put through a special form (a model form is also given). (A.K.)

  2. Final Environmental Impact Statement Resource Programs

    International Nuclear Information System (INIS)

    1993-02-01

    BPA's preferred alternative is the Emphasize Conservation Alternative. System and environmental costs are low. Environmental impacts from conservation are minimal. This alternative is cost-effective and environmentally responsible; only the High Conservation Alternative has lower costs and fewer environmental impacts. However, there is some concern about the cost-effectiveness, reliability, and commercial availability of the high conservation resources. If the supply of the additional conservation potential was confirmed and it became cost-effective, the High Conservation Alternative would be preferred. The Draft Resource Programs EIS was released for public review during the summer of 1992. Comments received by letter or in the public hearing held June 16, 1992, were used to revise and update data and analyses of the EIS (public comments and BPA's responses are contained in Volume III of the Final EIS). In addition, a number of revisions were made in the Chapter 3 material describing each resource type, and in Chapter 4 and the Summary, to assure consistency with the modeling and analysis in Chapter 5. Additional information about the capacity aspects of each resource type and alternative has been added, and the material on conservation and its impacts has been reorganized

  3. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2018; Medicare Shared Savings Program Requirements; and Medicare Diabetes Prevention Program. Final rule.

    Science.gov (United States)

    2017-11-15

    This major final rule addresses changes to the Medicare physician fee schedule (PFS) and other Medicare Part B payment policies such as changes to the Medicare Shared Savings Program, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. In addition, this final rule includes policies necessary to begin offering the expanded Medicare Diabetes Prevention Program model.

  4. Extraction of Static and Dynamic Reservoir Operation Rules by Genetic Programming

    Directory of Open Access Journals (Sweden)

    Habib Akbari Alashti

    2014-11-01

    Full Text Available Considering the necessity of desirable operation of limited water resources and assuming the significant role of dams in controlling and consuming the surface waters, highlights the advantageous of suitable operation rules for optimal and sustainable operation of dams. This study investigates the hydroelectric supply of a one-reservoir system of Karoon3 using nonlinear programming (NLP, genetic algorithm (GA, genetic programming (GP and fixed length gen GP (FLGGP in real-time operation of dam considering two approaches of static and dynamic operation rules. In static operation rule, only one rule curve is extracted for all months in a year whereas in dynamic operation rule, monthly rule curves (12 rules are extracted for each month of a year. In addition, nonlinear decision rule (NLDR curves are considered, and the total deficiency function as the target (objective function have been used for evaluating the performance of each method and approach. Results show appropriate efficiency of GP and FLGGP methods in extracting operation rules in both approaches. Superiority of these methods to operation methods yielded by GA and NLP is 5%. Moreover, according to the results, it can be remarked that, FLGGP method is an alternative for GP method, whereas the GP method cannot be used due to its limitations. Comparison of two approaches of static and dynamic operation rules demonstrated the superiority of dynamic operation rule to static operation rule (about 10% and therefore this method has more capabilities in real-time operation of the reservoirs systems.

  5. The Seward Park Family Literacy Program. Final Evaluation Report 1992-93. OREA Report.

    Science.gov (United States)

    Musante, Patricia

    The Seward Park Family Literacy Program was an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Seward Park High School in Manhattan (New York). In 1992-93 the program served Cantonese-, Mandarin-, and Spanish-speaking adults of limited English proficiency with instruction in English as a second…

  6. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, October--December 1995 (first quarter of fiscal year 1996)

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1996-03-01

    This is the Site Operator Program quarterly report for USDOE electric and hybrid vehicle research. Its mission now includes the three major activity categories of advancement of electric vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use and increasing public awareness and acceptance of EVs. The 11 Site Operator Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of the site operators totals about 250 vehicles. The individual fleets are summarized.

  7. Final Report - Membranes and MEA's for Dry, Hot Operating Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Hamrock, Steven J

    2011-06-30

    The focus of this program was to develop a new Proton Exchange Membrane (PEM) which can operate under hotter, dryer conditions than the state of the art membranes today and integrate it into a Membrane Electrode Assembly (MEA). These MEA's should meet the performance and durability requirements outlined in the solicitation, operating under low humidification conditions and at temperatures ranging from -20ºC to 120ºC, to meet 2010 DOE technical targets for membranes. This membrane should operate under low humidification conditions and at temperatures ranging from -20ºC to 120ºC in order to meet DOE HFCIT 2010 commercialization targets for automotive fuel cells. Membranes developed in this program may also have improved durability and performance characteristics making them useful in stationary fuel cell applications. The new membranes, and the MEA's comprising them, should be manufacturable at high volumes and at costs which can meet industry and DOE targets. This work included: A) Studies to better understand factors controlling proton transport within the electrolyte membrane, mechanisms of polymer degradation (in situ and ex situ) and membrane durability in an MEA; B) Development of new polymers with increased proton conductivity over the range of temperatures from -20ºC to 120ºC and at lower levels of humidification and with improved chemical and mechanical stability; C) Development of new membrane additives for increased durability and conductivity under these dry conditions; D) Integration of these new materials into membranes and membranes into MEA's, including catalyst and gas diffusion layer selection and integration; E) Verification that these materials can be made using processes which are scalable to commercial volumes using cost effective methods; F) MEA testing in single cells using realistic automotive testing protocols. This project addresses technical barriers A (Durability) and C (Performance) from the Fuel Cells section of the

  8. EDF EPR project: operating principles validation and human factor engineering program

    International Nuclear Information System (INIS)

    Lefebvre, B.; Berard, E.; Arpino, J.-M.

    2005-01-01

    This article describes the specificities of the operating principles chosen by EDF for the EPR project as a result of an extensive Human Factor Engineering program successfully implemented in an industrial project context. The design process and its achievements benefit of the EDF experience feedback not only in term of NPP operation - including the fully computerized control room of the N4-serie - but also in term of NPP designer. The elements exposed hereafter correspond to the basic design phase of EPR HMI which has been completed and successfully validated by the end of 2003. The article aims to remind the context of the project which basically consists in designing a modern and efficient HMI taking into account the operating needs while relying on proven and reliable technologies. The Human Factor Engineering program implemented merges these both aspects by : 1) being fully integrated within the project activities and scheduling; 2) efficiently taking into account the users needs as well as the feasibility constraints by relying on a multidisciplinary design team including HF specialists, I and C specialists, Process specialists and experienced operator representatives. The resulting design process makes a wide use of experience feedback and experienced operator knowledge to complete largely the existing standards for providing a fully useable and successful design method in an industrial context. The article underlines the design process highlights that largely contribute to the successful implementation of a Human Factor Engineering program for EPR. (authors)

  9. Water Treatment Plant Operation Volume 2. A Field Study Training Program. Revised.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  10. High Efficiency Thermionics (HET-IV) and Converter Advancement (CAP) programs. Final reports

    Energy Technology Data Exchange (ETDEWEB)

    Geller, C.B.; Murray, C.S.; Riley, D.R. [Bettis Atomic Power Lab., West Mifflin, PA (United States); Desplat, J.L.; Hansen, L.K.; Hatch, G.L.; McVey, J.B.; Rasor, N.S. [Rasor Associates, Inc., Sunnyvale, CA (United States)

    1996-04-01

    This report contains the final report of the High Efficiency Thermionics (HET-IV) Program, Attachment A, performed at Rasor Associates, Inc. (RAI); and the final report of the Converter Advancement Program (CAP), performed at the Bettis Atomic Power Laboratory, Attachment B. The phenomenology of cesium-oxygen thermionic converters was elucidated in these programs, and the factors that had prevented the achievement of stable, enhanced cesium-oxygen converter performance for the previous thirty years were identified. Based on these discoveries, cesium-oxygen vapor sources were developed that achieved stable performance with factor-of-two improvements in power density and thermal efficiency, relative to conventional, cesium-only ignited mode thermionic converters. Key achievements of the HET-IV/CAP programs are as follows: a new technique for measuring minute traces of oxygen in cesium atmospheres; the determination of the proper range of oxygen partial pressures for optimum converter performance--10{sup {minus}7} to 10{sup {minus}9} torr; the discovery, and analysis of the cesium-oxygen liquid migration and compositional segregation phenomena; the successful use of capillary forces to contain the migration phenomenon; the use of differential heating to control compositional segregation, and induce vapor circulation; the development of mechanically and chemically stable, porous reservoir structures; the development of precise, in situ oxygen charging methods; stable improvements in emitter performance, up to effective emitter bare work functions of 5.4 eV; stable improvements in barrier index, to value below 1.8 Volts; the development of detailed microscopic models for cesium-oxygen reservoir dynamics and collector work function behavior; and the discovery of new relationships between electrode geometry and Schock Instability.

  11. CAISI Operational Assessment (OA) data collection results. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-31

    One of the lessons learned from Operation Desert Shield/Storm was the inability of deployed Combat Service Support (CSS) computers to exchange data effectively in a battlefield environment. The work-around solution to this previously identified problem has been to physically carry floppy disks between computers. A General Officer Steering Committee, directed by the Vice Chief of Staff of the Army, determined that immediate corrective action was necessary to ensure viability of the CSS Battlefield Mission Area. The study recommended that a three-phased system development plan address short-, mid- and long-term CSS automation communication interface requirements. In response to this study, Program Executive Office (PEO) Standard Army Management Information System (STAMIS) authorized the development of the CSS Automated Information System Interface (CAISI). Phase I (Near-Term) equipped the {open_quotes}first to fight{close_quotes} Contingency Corps units. Phase II (Mid-Term) is being fielded to the remainder of Force Package One units in the active force. Phase III (Long-Term) will equip the remaining units. CAISI is now in the early stages of Phase II fielding. Prior to full Phase II fielding, CAISI must be approved for production by a Milestone III decision authority. Part of the data that will be used in the Milestone III decision is a demonstration of the CAISI`s operational suitability, as assessed by the US Army Operational Test and Evaluation Command (OPTEC). This assessment will be performed through an Operational Assessment (OA) using data provided from previous technical testing, such as the CAISI Customer User Test (CUT), and a field training exercise conducted by units of the XVIII Airborne Corps. The field training exercise data collection took place during two events.

  12. Measurement of Lake Roosevelt biota in relation to reservoir operations. Final report 1993

    International Nuclear Information System (INIS)

    Voeller, A.C.

    1993-01-01

    The purpose of this study was to collect biological data from Lake Roosevelt to be used in the design of a computer model that will predict biological responses to reservoir operations as part of the System Operation Review Program. This study worked in conjunction with Lake Roosevelt Monitoring Project which investigated the effectiveness of two kokanee salmon hatcheries. This report summarized the data collected from Lake Roosevelt from 1993 and includes limnological, reservoir operation, zooplankton, benthic macroinvertebrate, experimental trawling, and net-pen rainbow trout tagging data. Major components of the Lake Roosevelt model include quantification of impacts to zooplankton, benthic macroinvertebrates, and fish caused by reservoir drawdowns and low water retention times

  13. Selection, training, qualification and licensing of Three Mile Island reactor operating personnel

    International Nuclear Information System (INIS)

    Eytchison, R.M.

    1980-01-01

    The various programs which were intended to staff Three Mile Island with competent, trained operators and supervisors are reviewed. The analysis includes a review of the regulations concerning operator training and licensing, and describes how the requirements were implemented by the NRC, Metropolitan Edison Company, and Babcock and Wilcox Company. Finally the programs conducted by these three organisations are evaluated. (U.K.)

  14. Mercury Deposition Network Site Operator Training for the System Blank and Blind Audit Programs

    Science.gov (United States)

    Wetherbee, Gregory A.; Lehmann, Christopher M.B.

    2008-01-01

    The U.S. Geological Survey operates the external quality assurance project for the National Atmospheric Deposition Program/Mercury Deposition Network. The project includes the system blank and blind audit programs for assessment of total mercury concentration data quality for wet-deposition samples. This presentation was prepared to train new site operators and to refresh experienced site operators to successfully process and submit system blank and blind audit samples for chemical analysis. Analytical results are used to estimate chemical stability and contamination levels of National Atmospheric Deposition Program/Mercury Deposition Network samples and to evaluate laboratory variability and bias.

  15. Small machine tools for small workpieces final report of the DFG priority program 1476

    CERN Document Server

    Sanders, Adam

    2017-01-01

    This contributed volume presents the research results of the program “Small machine tools for small work pieces” (SPP 1476), funded by the German Research Society (DFG). The book contains the final report of the priority program, presenting novel approached for size-adapted, reconfigurable micro machine tools. The target audience primarily comprises research experts and practitioners in the field of micro machine tools, but the book may also be beneficial for graduate students.

  16. 76 FR 70169 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-11-10

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority... on NUREG-0498, ``Final Environmental Statement, Supplement 2, Related to the Operation of Watts Bar... the Nuclear Regulatory Commission. Stephen J. Campbell, Chief, Watts Bar Special Projects Branch...

  17. An augmented audit program for assuring radiation safety during radiographic examination operations

    International Nuclear Information System (INIS)

    Jervey, R.A. Jr.; Papin, P.J.

    1993-01-01

    Auditing a gamma radiography program is required as part of the authorizing license. Checklists and cursory reviews are the typical approach to addressing program requirements. A more proactive approach is recommended. The audit program described was prepared for a specific set of operating conditions but can be applied to any given program. Improvements in the effectiveness of the radiography safety program can be made with additional examination and emphasis on direct observation of licensed activities

  18. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  19. 75 FR 19968 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2010-04-16

    ... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...

  20. Terry Turbopump Expanded Operating Band Full-Scale Component and Basic Science Detailed Test Plan - Final.

    Energy Technology Data Exchange (ETDEWEB)

    Osborn, Douglas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Solom, Matthew [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

  1. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  2. Faith 7 L. Gordon Cooper, Jr., and the final Mercury mission

    CERN Document Server

    Burgess, Colin

    2016-01-01

    This book celebrates the final spaceflight in the Mercury series, flown by NASA astronaut Gordon Cooper, who led an adventurous life in the cockpit of airplanes and spacecraft alike, and on his Mercury mission he became the last American ever to rocket into space alone. He flew in the Mercury and Gemini programs and served as head of flight crew operations in both the Apollo and Skylab programs. His final Mercury mission closed out a pivotal chapter in American spaceflight. Based on extensive research and first-person interviews, this is a complete history of the Faith 7 flight and its astronaut. Cooper later gained notoriety following the release of the movie, The Right Stuff, in which he was depicted by Dennis Quaid, but Burgess discovers there was even more drama to his story. This recounting of the final Mercury 7 flight completes Burgess's investigation of the early spaceflight program in thrilling fashion.

  3. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  4. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2012-09-25

    ... Objection to State Operating Permit for Cheyenne Light, Fuel & Power, Wygen II Power Plant AGENCY... to Cheyenne Light, Fuel & Power (CLF&P) for their Wygen II power plant (Wygen II). Pursuant to... final Order, the Petition, and other supporting information. You may view the hard copies Monday through...

  5. Summary of NRC LWR safety research programs on fuel behavior, metallurgy/materials and operational safety

    International Nuclear Information System (INIS)

    Bennett, G.L.

    1979-09-01

    The NRC light-water reactor safety-research program is part of the NRC regulatory program for ensuring the safety of nuclear power plants. This paper summarizes the results of NRC-sponsored research into fuel behavior, metallurgy and materials, and operational safety. The fuel behavior research program provides a detailed understanding of the response of nuclear fuel assemblies to postulated off-normal or accident conditions. Fuel behavior research includes studies of basic fuel rod properties, in-reactor tests, computer code development, fission product release and fuel meltdown. The metallurgy and materials research program provides independent confirmation of the safe design of reactor vessels and piping. This program includes studies on fracture mechanics, irradiation embrittlement, stress corrosion, crack growth, and nondestructive examination. The operational safety research provides direct assistance to NRC officials concerned with the operational and operational-safety aspects of nuclear power plants. The topics currently being addressed include qualification testing evaluation, fire protection, human factors, and noise diagnostics

  6. Intergrated plant safety assessment. Systematic evaluation program. Palisades plant, Consumers Power Company, Docket No. 50-255. Final report

    International Nuclear Information System (INIS)

    1982-10-01

    The Nuclear Regulatory Commission (NRC) has published its Final Integrated Plant Safety Assessment Report (IPSAR) (NUREG-0820), under the scope of the Systematic Evaluation Program (SEP), for Consumers Power Company's Palisades Plant located in Covert, Van Buren County, Michigan. The SEP was initiated by the NRC to review the design of older operating nuclear reactor plants to reconfirm and document their safety. This report documents the review completed under the SEP for the Palisades Plant. The review has provided for (1) as assessment of the significance of differences between current technical positions on selected safety issues and those that existed when the Palisades Plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety when all supplements to the Final IPSAR and the Safety Evaluation Report for converting the license from a provisional to a full-term license have been issued. The report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the Draft Report, issued in April 1982

  7. 75 FR 2800 - Special Community Disaster Loans Program

    Science.gov (United States)

    2010-01-19

    ... purpose of the Special CDL program is not to underwrite pre-disaster budget or deficits of the local... budget which then results in either an operating surplus or deficit. Finally, one commenter stated that... operating deficit. FEMA expects the reassessment will have no impact on the calculation of the operating...

  8. 75 FR 43478 - Rhode Island: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-07-26

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental.... Mail: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07... Delivery or Courier: Deliver your comments to: Robin Biscaia, RCRA Waste Management Section, Office of Site...

  9. EPRI flow-loop/in situ test program for motor-operated valves

    International Nuclear Information System (INIS)

    Hosler, J.F.; Dorfman, L.S.

    1994-01-01

    The Electric Power Research Institute is undertaking a comprehensive research program to develop and validate methods for predicting the performance of common motor-operated gate, global, and butterfly valves. To assess motor-operated valve (MOV) performance characteristics and provide a basis for methods validation, full-scale testing was conducted on 62 MOVs. Tests were performed in four flow-loop facilities and in nine nuclear units. Forty-seven gate, five globe, and 10 butterfly valves were tested under a wide range of flow and differential pressure conditions. The paper describes the test program scope, test configurations, instrumentation and data acquisition, testing approach, and data analysis methods. Key results are summarized

  10. Operational experience from SFR - Final repository for low- and intermediate level waste in Sweden

    International Nuclear Information System (INIS)

    Skogsberg, Marie; Ingvarsson, Roger

    2006-01-01

    SFR, the Swedish Final Repository for Radioactive Waste, has been in operation since April 1988. It was designed for short lived LLW/ILW from the operation and maintenance of all Swedish Nuclear Power Plants. The first stage was constructed for 63 000 m 3 which was assumed to give a margin and flexibility for the preliminary operational period. Today this volume represents the whole prediction of operational waste. Until the end of 2005 SFR has received 30 930 m 3 waste. In average it has been 2-3 derivations per year at the repository. The most derivations happened in the years 1993-1995, and that was also the years when the repository received the most volume of waste. The most of the derivations those years was related to the waste packages. The dose rate to the personal has always been very low in the latest years the collective dose has been under 0,1 mmanSv/year. (author)

  11. Design basis programs and improvements in plant operation

    International Nuclear Information System (INIS)

    Metcalf, M.F.

    1991-01-01

    Public Service Electric and Gas (PSE and G) Company operates three commercial nuclear power plants in southern New Jersey. The three plants are of different designs and vintages (two pressurized water reactors licensed in 1976 and 1980 and one boiling water reactor licensed in 1986). As the industry recognized the need to develop design basis programs, PSE and G also realized the need after a voluntary 52-day shutdown of one unit because of electrical design basis problems. In its drive to be a premier electric utility, PSE and G has been aggressively active in developing design basis documents (DBDs) with supporting projects and refined uses to obtain the expected value and see the return on investment. Progress on Salem is nearly 75% complete, while Hope Creek is 20% complete. To data, PSE and G has experienced success in the use of DBDs in areas such as development of plant modifications, development of the reliability-centered maintenance program, procedure upgrades, improved document retrieval, resolution of regulatory issues, and training. The paper examines the design basis development process, supporting projects, and expected improvements in plant operations as a result of these efforts

  12. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  13. United States Air Force Summer Faculty Research Program. 1980 Program Management Report.

    Science.gov (United States)

    1980-10-01

    COIVERECP _,-NITED ARFORCE_~~ 14ME FINAL f4- RESEARC - PROGRAM, AAEETRPOT 6. PERFORMING ORG. REPORT NURE 7. AUTH s4 ) ’..---- 8. CONTRACT OR GRANT NUMBFR(si...Winkofsky Multiband Airborne Radio System (MFBARS) Operational Impact Study: A Marketing Perspective 85 Application of Risk Analysis In the Dr. George...OPERATIONAL IMPACT STUDY: A MARKETING PEHSPECTIVE by E.P. WINKOFSKY ABSTRACT In order to transition technological advancements, research laboratories

  14. 340B Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    Science.gov (United States)

    2017-05-19

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.

  15. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  16. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  17. Vascular Trauma Operative Experience is Inadequate in General Surgery Programs.

    Science.gov (United States)

    Yan, Huan; Maximus, Steven; Koopmann, Matthew; Keeley, Jessica; Smith, Brian; Virgilio, Christian de; Kim, Dennis Y

    2016-05-01

    Vascular injuries may be challenging, particularly for surgeons who have not received formal vascular surgery fellowship training. Lack of experience and improper technique can result in significant complications. The objective of this study was to examine changes in resident experience with operative vascular trauma over time. A retrospective review was performed using Accreditation Council for Graduate Medical Education (ACGME) case logs of general surgery residents graduating between 2004 and 2014 at 2 academic, university-affiliated institutions associated with level 1 trauma centers. The primary outcome was number of reported vascular trauma operations, stratified by year of graduation and institution. A total of 112 residents graduated in the study period with a median 7 (interquartile range 4.5-13.5) vascular trauma cases per resident. Fasciotomy and exposure and/or repair of peripheral vessels constituted the bulk of the operative volume. Linear regression showed no significant trend in cases with respect to year of graduation (P = 0.266). Residents from program A (n = 53) reported a significantly higher number of vascular trauma cases when compared with program B (n = 59): 12.0 vs. 5.0 cases, respectively (P < 0.001). Level 1 trauma center verification does not guarantee sufficient exposure to vascular trauma. The operative exposure in program B is reflective of the national average of 4.0 cases per resident as reported by the ACGME, and this trend is unlikely to change in the near future. Fellowship training may be critical for surgeons who plan to work in a trauma setting, particularly in areas lacking vascular surgeons. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Modules program structures and the structuring of operating systems

    NARCIS (Netherlands)

    Bron, C.; Duijvestijn, W.; Lockemann, P.C.

    1981-01-01

    In this paper some views are presented on the way in which complex systems, such as Operating Systems and the programs to be interfaced with them can be constructed, and how such systems may become heavily library oriented. Although such systems have a dynamic nature, all interfacing within and

  19. 77 FR 35953 - Arts in Education National Program; Final Priority, Requirements, Definitions, and Selection...

    Science.gov (United States)

    2012-06-15

    ..., standards-based teaching that is unique to music education. The commenter added that it would be beneficial... DEPARTMENT OF EDUCATION [CFDA Number 84.351F] Arts in Education National Program; Final Priority... Education. ACTION: Notice. SUMMARY: The Assistant Deputy Secretary for Innovation and Improvement announces...

  20. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  1. 75 FR 39090 - Airport Privatization Pilot Program

    Science.gov (United States)

    2010-07-07

    ... Privatization Pilot Program AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of Receipt and... pilot program received under 49 U.S.C. Section 47134. The preliminary application is accepted for review... operator, negotiate an agreement and submit a final application to the FAA for exemption under the pilot...

  2. 31 CFR 103.135 - Anti-money laundering programs for operators of credit card systems.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Anti-money laundering programs for...-Money Laundering Programs Anti-Money Laundering Programs § 103.135 Anti-money laundering programs for.... Virgin Islands. (b) Anti-money laundering program requirement. Effective July 24, 2002, each operator of...

  3. 78 FR 24734 - Final Environmental Impact Statement for the Construction and Operation of an Infantry Platoon...

    Science.gov (United States)

    2013-04-26

    ... DEPARTMENT OF DEFENSE Department of the Army Final Environmental Impact Statement for the... Environmental Impact Statement (PEIS), Southwest of Range 20, is not operationally feasible and has been.... The Army identified and analyzed environmental and socioeconomic impacts associated with the proposed...

  4. Preventive maintenance basis: Volume 16 -- Power operated relief valves, solenoid actuated. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This volume 16 of the report provides a program of PM tasks suitable for application to power operated relief valves (PORV's) that are solenoid actuated. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  5. Regional Operations Research Program for Commercialization of Geothermal Energy in the Rocky Mountain Basin and Range. Final Technical Report, January 1980--March 1981

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-07-01

    This report describes the work accomplished from January 1980 to March 1981 in the Regional Operations Research efforts for the Rocky Mountain Basin and Range Geothermal Commercialization Program. The scope of work is as described in New Mexico State University Proposal 80-20-207. The work included continued data acquisition and extension of the data base, enhancement and refinement of the economic models for electric and direct use applications, site-specific and aggregated analyses in support of the state teams, special analyses in support of several federal agencies, and marketing assistance to the state commercialization teams.

  6. Standard Guide for Radiation Protection Program for Decommissioning Operations

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1987-01-01

    1.1 This guide provides instruction to the individual charged with the responsibility for developing and implementing the radiation protection program for decommissioning operations. 1.2 This guide provides a basis for the user to develop radiation protection program documentation that will support both the radiological engineering and radiation safety aspects of the decommissioning project. 1.3 This guide presents a description of those elements that should be addressed in a specific radiation protection plan for each decommissioning project. The plan would, in turn, form the basis for development of the implementation procedures that execute the intent of the plan. 1.4 This guide applies to the development of radiation protection programs established to control exposures to radiation and radioactive materials associated with the decommissioning of nuclear facilities. The intent of this guide is to supplement existing radiation protection programs as they may pertain to decommissioning workers, members of...

  7. The revised program for measurements in intense operation mode according to AVV-IMIS

    International Nuclear Information System (INIS)

    Bieringer, J.; Wirth, E.; Buehling, A.; Mueller-Neumann, M.; Haase, G.; Heinrich, T.; Steinkopff, T.; Wiezorek, C.

    2007-01-01

    The monitoring program for measurements in intense operation mode has been revised recently by a working group at the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU). The major issues of the revision are reported in this contribution. Measurements in intense operation must be appropriate for fast assessment of the radiological situation, for estimating the dose to the population and for decisions on countermeasures to minimize the dose. In order to meet these requirements the structure of the measurement program in intense operation mode was divided into three phases when different exposition paths are relevant: before and during dispersion of radioactive material, immediately after dispersion of radioactive material has ended and a late phase when contamination values have decreased in different environmental media. For each of these phases a special measurement program was defined that is tailored to achieve the above mentioned objectives. Minimum detectable activity concentrations were introduced similar to the measurement program in routine operation mode. They follow the intervention levels in the catalogue of countermeasures and maximum permitted values given by the European Union (EU) for food and animal feed. The minimum detectable activity concentrations were defined such that the detection of 1/10 of the intervention levels for countermeasures is ensured. (orig.)

  8. The Rendezvous Monitoring Display Capabilities of the Rendezvous and Proximity Operations Program

    Science.gov (United States)

    Brazzel, Jack; Spehar, Pete; Clark, Fred; Foster, Chris; Eldridge, Erin

    2013-01-01

    The Rendezvous and Proximity Operations Program (RPOP) is a laptop computer- based relative navigation tool and piloting aid that was developed during the Space Shuttle program. RPOP displays a graphical representation of the relative motion between the target and chaser vehicles in a rendezvous, proximity operations and capture scenario. After being used in over 60 Shuttle rendezvous missions, some of the RPOP display concepts have become recognized as a minimum standard for cockpit displays for monitoring the rendezvous task. To support International Space Station (ISS) based crews in monitoring incoming visiting vehicles, RPOP has been modified to allow crews to compare the Cygnus visiting vehicle s onboard navigated state to processed range measurements from an ISS-based, crew-operated Hand Held Lidar sensor. This paper will discuss the display concepts of RPOP that have proven useful in performing and monitoring rendezvous and proximity operations.

  9. Feed-pump hydraulic performance and design improvement, Phase I: research program design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.; Thompson, W.E.; Wilson, D.G.

    1982-03-01

    As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform the needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume discusses the design, performance and failures of feed pumps, and recommendations for research on pump dynamics, design, and specifications.

  10. Environmental program audit: Portsmouth Uranium Enrichment Complex, Piketon, Ohio. Final report

    International Nuclear Information System (INIS)

    Smith, W.M.

    1985-01-01

    The audit was performed by observing operations, inspecting facilities and equipment, examining monitoring procedures and data, and evaluating compliance with applicable DOE Orders and federal and state regulations. On the basis of available information, no imminent danger to public health or safety was disclosed by the audit. Wastewater treatment facilities are well operated, and there appears to be adequate characterization of current hazardous waste. Similarly, regulatory compliance with NPDES surface water monitoring and discharge requirements is satisfactory. Specific deficiencies in the environmental management program are defined for improvement. These areas include the monitoring network and compliance with air quality standards, water quality standards, waste disposal, and record keeping

  11. QA programs in nuclear power plants

    International Nuclear Information System (INIS)

    Ellingson, A.C.

    1976-01-01

    As an overview of quality assurance programs in nuclear power plants, the energy picture as it appears today is reviewed. Nuclear power plants and their operations are described and an attempt is made to place in proper perspective the alleged ''threats'' inherent in nuclear power. Finally, the quality assurance programs being used in the nuclear industry are described

  12. A model technology transfer program for independent operators

    Energy Technology Data Exchange (ETDEWEB)

    Schoeling, L.G.

    1996-08-01

    In August 1992, the Energy Research Center (ERC) at the University of Kansas was awarded a contract by the US Department of Energy (DOE) to develop a technology transfer regional model. This report describes the development and testing of the Kansas Technology Transfer Model (KTTM) which is to be utilized as a regional model for the development of other technology transfer programs for independent operators throughout oil-producing regions in the US. It describes the linkage of the regional model with a proposed national technology transfer plan, an evaluation technique for improving and assessing the model, and the methodology which makes it adaptable on a regional basis. The report also describes management concepts helpful in managing a technology transfer program.

  13. Handbook for nuclear power plant self-assessment programs. Final report, July 1991

    International Nuclear Information System (INIS)

    1991-07-01

    EPRI has prepared this handbook to help utilities with their Self-Assessment Programs at nuclear power plants. Self-assessments are independent reviews performed by nuclear plant utilities to identify trends in operational activities that are important to safety, and to assess the impact of these trends on plant safety. Activities performed as self-assessments include reviews and evaluations of plant performance and abnormal events, technical evaluations of plant activities to identify potential problem areas, and reviews of other sources of plant design and operating experience for applicability to safety. This handbook is based on information obtained from utilities and includes examples of activities and methods that have proven effective. The handbook includes a summary of NRC requirements, guidelines for self-assessment program planning, descriptions and examples of investigative techniques, and key references that can be consulted for additional information. It can serve as a training guide for plant staff members who are assigned to self-assessment activities. (author)

  14. The Remote Security Station (RSS) final report

    International Nuclear Information System (INIS)

    Pletta, J.B.; Amai, W.A.; Klarer, P.; Frank, D.; Carlson, J.; Byrne, R.

    1992-10-01

    The Remote Security Station (RSS) was developed by Sandia National Laboratories for the Defense Nuclear Agency to investigate issues pertaining to robotics and sensor fusion in physical security systems. This final report documents the status of the RSS program at its completion in April 1992. The RSS system consists of the Man Portable Security Station (MaPSS) and the Telemanaged Mobile Security Station (TMSS), which are integrated by the Operator's Control Unit (OCU) into a flexible exterior perimeter security system. The RSS system uses optical, infrared, microwave, and acoustic intrusion detection sensors in conjunction with sensor fusion techniques to increase the probability of detection and to decrease the nuisance alarm rate of the system. Major improvements to the system developed during the final year are an autonomous patrol capability, which allows TMSS to execute security patrols with limited operator interaction, and a neural network approach to sensor fusion, which significantly improves the system's ability to filter out nuisance alarms due to adverse weather conditions

  15. The Library of Congress: Evaluation of the NLS/BPH Braille and Audio Magazine Program. Final Project Report.

    Science.gov (United States)

    Bosma and Associates International, Seattle, WA.

    This final report presents an independent formative and summative evaluation of the National Library Services for the Blind and Physically Handicapped (NLS/BPH) braille and audio magazine program. In this program, 77 magazines are distributed directly to subscribers, with 43 magazines available on audio flexible discs and 34 magazines available in…

  16. U.S. Geological Survey Streamgage Operation and Maintenance Cost Evaluation...from the National Streamflow Information Program

    Science.gov (United States)

    Norris, J. Michael

    2010-01-01

    To help meet the goal of providing earth-science information to the Nation, the U.S. Geological Survey (USGS) operates and maintains the largest streamgage network in the world, with over 7,600 active streamgages in 2010. This network is operated in cooperation with over 850 Federal, tribal, State, and local funding partners. The streamflow information provided by the USGS is used for the protection of life and property; for the assessment, allocation, and management of water resources; for the design of roads, bridges, dams, and water works; for the delineation of flood plains; for the assessment and evaluation of habitat; for understanding the effects of land-use, water-use, and climate changes; for evaluation of water quality; and for recreational safety and enjoyment. USGS streamgages are managed and operated to rigorous national standards, allowing analyses of data from streamgages in different areas and spanning long time periods, some with more than 100 years of data. About 90 percent of USGS streamgages provide streamflow information real-time on the web. Physical measurements of streamflow are made at streamgages multiple times a year, depending on flow conditions, to ensure the highest level of accuracy possible. In addition, multiple reviews and quality assurance checks are performed before the data is finalized. In 2006, the USGS reviewed all activities, operations, equipment, support, and costs associated with operating and maintaining a streamgage program (Norris and others, 2008). A summary of the percentages of costs associated with activities required to operate a streamgage on an annual basis are presented in figure 1. This information represents what it costs to fund a 'typical' USGS streamgage and how those funds are utilized. It should be noted that some USGS streamgages have higher percentages for some categories than do others depending on location and conditions. Forty-one percent of the funding for the typical USGS streamgage is for labor

  17. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    International Nuclear Information System (INIS)

    Williams, Don

    2014-01-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation's electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy's (DOE) Office of Nuclear Energy [NE] and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE's Light Water Reactor Sustainability [LWRS] Program and EPRI's Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to @@@establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.@@@ This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  18. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  19. The Establishment and Administration of Operant Conditioning Programs in a State Hospital for the Retarded.

    Science.gov (United States)

    Ball, Thomas S., Ed.

    Seven articles treat the establishment of operant conditioning programs for the mentally retarded at Pacific State Hospital in California. Emphasis is on the administrative rather than the demonstration of research aspects of operant conditioning programs. Following an introduction and overview, the medical director's point of view on operant…

  20. Operational Design that Synthesizes Art and Science

    Science.gov (United States)

    2011-05-04

    FINAL 3. DATES COVERED (From - To) Feb - May 2011 4. TITLE AND SUBTITLE OPERATIONAL DESIGN THAT SYNTHESIZES ART AND SCIENCE 5a...TITLE AND SUBTITLE Operational Design That Synthesizes Art And Science 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR...proponents of EBO view warfare as only a science and not a combination of art and science . 9 Another main point of contention centered on the term

  1. Biomedical Computing Technology Information Center (BCTIC): Final progress report, March 1, 1986-September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    During this time, BCTIC packaged and disseminated computing technology and honored all requests made before September 1, 1986. The final month of operation was devoted to completing code requests, returning submitted codes, and sending out notices of BCTIC's termination of services on September 30th. Final BCTIC library listings were distributed to members of the active mailing list. Also included in the library listing are names and addresses of program authors and contributors in order that users may have continued support of their programs. The BCTIC library list is attached

  2. Patents Assessed through Sectoral Operational Programs

    Directory of Open Access Journals (Sweden)

    Paula – Angela VIDRAȘCU

    2014-06-01

    Full Text Available According to the International Accounting Standards – IAS 38 „Intangible assets”; these assets are identifiable non-monetary assets under construction were considered without physical substance. Lack actual physical form must not be understood that an intangible asset would have no material support, because the presence of any intangible asset can be demonstrated only by a support material form. Exmple: frequently encounter compact-disc (in case a software, legal documentation (in the case of licences, trade marks and patents of invention, contracts, permits and licences, technical documentation or films. Nowadays we are constantly subjected to the changing flow of information that is found in a perpetual technological change which started the emergence of a new stage in the society development that which carries the name of knowledge. The object of my research is the patent for the structural funds reimbursable project submitted in the "Operational Program, Economic Competitiveness" Operation 2.3.1. "Support for start-ups and innovative spin-offs. Patent is an official document certifying the inventor, the exclusive right to produce a certain good or product or use a particular process. Remember that evaluation of intangible assets is the most complex and systematic procedure.

  3. ORSERG resource book. Operational reactor safety engineering and review group. Final report, March 1992

    International Nuclear Information System (INIS)

    1992-03-01

    EPRI has prepared this resource book to help utilities with their Self-Assessment Programs at nuclear power plants. Self-assessments are reviews performed by nuclear power plant utilities to monitor plant performance status and adequacy, identify trends in operational activities important to safety, and assess the impact of these trends on plant safety. Activities performed as self-assessments include reviews and evaluations of plant performance and abnormal events, technical evaluations of plant activities to identify potential problem areas, and reviews of other sources of plant design and operating experience for applicability to safety. This resource book is based on information obtained from utilities and includes examples of activities and methods that have proven effective. The resource book includes a summary of NRC requirements, guidelines for self-assessment program planning, descriptions and examples of investigative techniques, and key references that can be consulted for additional information. It can serve as a training guide for plant staff members who are assigned to self-assessment activities. (author)

  4. Eat Smart! Ontario's Healthy Restaurant Program: focus groups with non-participating restaurant operators.

    Science.gov (United States)

    Dwyer, John J M; Macaskill, Lesley A; Uetrecht, Connie L; Dombrow, Carol

    2004-01-01

    Eat Smart! Ontario's Healthy Restaurant Program is a standard provincial health promotion program. Public health units give an award of excellence to restaurants that meet nutrition, food safety, and non-smoking seating standards. The purpose of this study was to determine why some restaurant operators have not applied to participate in the program, and how to get them to apply. Four focus group interviews were conducted with 35 operators who didn't apply to participate. The analysis of responses yielded various themes. The participants' perceived barriers to participation were misunderstandings about how to qualify for the program, lack of time, concern about different non-smoking bylaw requirements, and potential loss of revenue. Their perceived facilitators to participation were convenience of applying to participate, franchise executives' approval to participate, a 100% non-smoking bylaw, flexibility in the assessment of restaurants, the opportunity for positive advertising, alternative payment for food handler training, and customer demand. Program staff can use the findings to develop and use strategies to encourage participation.

  5. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  6. PLC and DTAM Software Programs for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This document describe the software programs for the Programmable Logic Controller and the Datable Access Module for Pumping Instrumentation and Control skid ''N''. The Appendices contains copies of the printouts of these software programs. This document describes the software programs for the Allen-Bradley SLC 500 programmable logic controller (PLC) and the Allen-Bradley DTAM PLUS operator interface module used on Pumping Instrumentation and Control (PIC) skid ''N''. The software programs for the SLC 500 and DTAM Plus are based on the core programs provided by Allen-Bradley. The PLC and DTAM software programs on skid ''D'' for SX-104 are the baseline programs. These baselines have been tailored for U-farm skids. The skid ''N'' program for U-109 is similar to the skid ''M'' program for U-102. An Acceptance Test Procedure (ATP) and an Operational Test Procedure (OTP) verify that the software programs meet the specific requirements for U-109 pumping. This document represents the final PLC and DTAM programs for PIC skid ''N'' at U-109. These programs were printed out after the performance of the OTP. The OTP acts as the final qualification test for the software programs. Functional requirements and details of the PLC ladder logic are described in this document. The final programs entered into the PLC and DTAM Plus are included as Appendices to this document

  7. NANA Wind Resource Assessment Program Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jay Hermanson

    2010-09-23

    NANA Regional Corporation (NRC) of northwest Alaska is located in an area with abundant wind energy resources. In 2007, NRC was awarded grant DE-FG36-07GO17076 by the US Department of Energy's Tribal Energy Program for funding a Wind Resource Assessment Project (WRAP) for the NANA region. The NANA region, including Kotzebue Electric Association (KEA) and Alaska Village Electric Cooperative (AVEC) have been national leaders at developing, designing, building, and operating wind-diesel hybrid systems in Kotzebue (starting in 1996) and Selawik (2002). Promising sites for the development of new wind energy projects in the region have been identified by the WRAP, including Buckland, Deering, and the Kivalina/Red Dog Mine Port Area. Ambler, Shungnak, Kobuk, Kiana, Noorvik & Noatak were determined to have poor wind resources at sites in or very near each community. However, all five of these communities may have better wind resources atop hills or at sites with slightly higher elevations several miles away.

  8. Basic Program Elements for Federal employee Occupational Safety and Health Programs and related matters; Subpart I for Recordkeeping and Reporting Requirements. Final rule.

    Science.gov (United States)

    2013-08-05

    OSHA is issuing a final rule amending the Basic Program Elements to require Federal agencies to submit their occupational injury and illness recordkeeping information to the Bureau of Labor Statistics (BLS) and OSHA on an annual basis. The information, which is already required to be created and maintained by Federal agencies, will be used by BLS to aggregate injury and illness information throughout the Federal government. OSHA will use the information to identify Federal establishments with high incidence rates for targeted inspection, and assist in determining the most effective safety and health training for Federal employees. The final rule also interprets several existing basic program elements in our regulations to clarify requirements applicable to Federal agencies, amends the date when Federal agencies must submit to the Secretary of Labor their annual report on occupational safety and health programs, amends the date when the Secretary of Labor must submit to the President the annual report on Federal agency safety and health, and clarifies that Federal agencies must include uncompensated volunteers when reporting and recording occupational injuries and illnesses.

  9. Overview of AEOD's program for trending reactor operational events

    International Nuclear Information System (INIS)

    Baranowsky, P.W.; O'Reilly, P.D.; Rasmuson, D.M.; Houghton, J.R.

    1994-01-01

    This paper presents an overview of the trending program being performed by AEOD. The major elements of the program include: (1) system and component reliability trending and analysis, (2) special data collection and analysis (e.g., IPE and PRA component failure data, common cause failure event data), (3) risk assessment of safety issues based on actual operating experience, (4) Accident Sequence Precursor (ASP) Program, and (5) trending US industry risk. AEOD plans to maintain up-to-date safety data trends for selected high risk or high regulatory profile components, systems, accident initiators, accident sequences, and regulatory issues. AEOD will also make greater use of PRA insights and perform limited probabilistic safety assessments to evaluate the safety significance of qualitative results. Examples of a system study and an issue evaluation are presented, as well as a summary of the common cause failure event database

  10. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Safety Resources About the Patient Education Program The Recovery Room Choosing Wisely Educational Programs Educational Programs Educational ... Lung Operation After Your Operation Your Discharge and Recovery Complete Video After Your Operation Guidance for after ...

  12. Columbia River System Operation Review final environmental impact statement. Appendix Q: Regional forum

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The SOR is currently developing a System Operating Strategy (SOS) that will guide the physical operations of the Columbia River system. The SOR is also addressing the institutional arrangements that must be in place to make needed changes to the SOS in the future, or make interpretations of the strategy in the light of changing water conditions or river needs. For convenience, this future institutional arrangement is referred to as ''The Columbia River Regional Forum,'' or simply ''the Forum,'' even though the nature of this institution is still to be determined. This appendix and the Final Environmental Impact Statement (EIS) identify the Forum as an administrative process that will not result in impacts to the environment and will not require analysis in a NEPA context. The composition of and procedures followed by a decision making body cannot--in and of themselves--be used to predict a particular decision with definable impacts on the environment. Nevertheless, because of the relationship to the other SOR actions, the SOR lead agencies have prepared this Technical Appendix to provide opportunities for review and comment on the Forum alternatives

  13. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  14. Special Programs for Individual Needs (SPIN). Handicapped Children Early Education Program: P.L. 91-230 Title VI, Part C. Final Report, July 1, 1974 to June 30, 1977.

    Science.gov (United States)

    Wight, Byron W.

    The document contains the final report of the Special Programs for Individualized Needs (SPIN) program designed to develop a demonstration model for training day care personnel to identify developmentally delayed or emotionally disturbed children and to program for them within the regular day care setting. Major objectives were to develop…

  15. A quality assurance program for environmental data operations involving waste management processes

    International Nuclear Information System (INIS)

    Johnson, G.L.; Blacker, S.M.

    1990-01-01

    This paper describes the 'core' elements needed in an effective Quality Program for environmental data operations involving nuclear, mixed, or non-nuclear wastes. For each core element, this paper examines the minimum components needed for an effective Quality Program for EDOs, and compares approaches to Quality Programs currently required by the U.S. DOE and the U.S. EPA. The comparison suggests how the Quality Program requirements used at DOE, and defined by NQA-1 and its supplements, and those used by EPA through its QAMS program guidance, may provide a basis for developing a harmonized Quality Program for EDOs involving any waste management processes, nuclear, non-nuclear, or mixed. (orig./DG)

  16. Energy management handbook for building operating engineers student workbook

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The handbook provides operating engineers with the basic information needed to implement specific energy conservation opportunities, and additional information is presented relative to the formulation and development of the energy management plan. Chapters are entitled: The Need for Energy Management (International Factors, The US Energy Situation, Energy and the Building Owner); The Fundamentals of Energy Consumption in Buildings (Energy Basics, Heat Basics, Heat Flow and the Building Envelope, Air and Comfort, Factors Affecting Energy Use In Buildings); Principles of Energy Conservation (Building Energy Consumption Characteristics); Planning the Energy Management Program (Obtaining Commitment and Support, Establishing the Energy Use Index, Organizing to Develop the Plan, Developing and Implementing the Plan); Conducting a Survey of Facilities and Operations (The Energy Audit, Preparation of Building and Systems Profile, Measurement and Instrumentation); Guidelines for Energy Conservation (Operator ECO's, Owner ECO'S); Developing the Draft Final Plan (Analyze Survey Findings, Putting the Plan on Paper, Review and Submit); Implementing the Program (Developing the Final Plan, Implementing the Plan, Monitoring and Updating the Program). A glossary is included and specific information on degree days and cooling hours for some selected cities and a computer energy study data for the New York Hilton are included in appendices. (MCW)

  17. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  18. The Advanced Test Reactor Strategic Evaluation Program

    International Nuclear Information System (INIS)

    Buescher, B.J.

    1990-01-01

    A systematic evaluation of safety, environmental, and operational issues has been initiated at the Advanced Test Reactor (ATR). This program, the Strategic Evaluation Program (STEP), provides an integrated review of safety and operational issues against the standards applied to licensed commercial facilities. In the review of safety issues, 18 deviations were identified which required prompt attention. Resolution of these items has been accelerated in the program. An integrated living schedule is being developed to address the remaining findings. A risk evaluation is being performed on the proposed corrective actions and these actions will then be formally ranked in order of priority based on considerations of safety and operational significance. Once the final ranking is completed, an integrated schedule will be developed, which will include considerations of availability of funding and operating schedule. 3 refs., 2 figs

  19. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  20. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  1. Medicaid program; premiums and cost sharing. Final rule; delay of effective date and reopening of comment period.

    Science.gov (United States)

    2009-03-27

    This action temporarily delays the effective date of the November 25, 2008 final rule entitled, Medicaid Program; Premiums and Cost Sharing" (73 FR 71828) until December 31, 2009. In addition, this action reopens the comment period on the policies set out in the November 25, 2008 final rule, and specifically solicits comments on the effect of certain provisions of the American Recovery and Reinvestment Act of 2009.

  2. Design a computational program to calculate the composition variations of nuclear materials in the reactor operations

    International Nuclear Information System (INIS)

    Mohmmadnia, Meysam; Pazirandeh, Ali; Sedighi, Mostafa; Bahabadi, Mohammad Hassan Jalili; Tayefi, Shima

    2013-01-01

    Highlights: ► The atomic densities of light and heavy materials are calculated. ► The solution is obtained using Runge–Kutta–Fehlberg method. ► The material depletion is calculated for constant flux and constant power condition. - Abstract: The present work investigates an appropriate way to calculate the variations of nuclides composition in the reactor core during operations. Specific Software has been designed for this purpose using C#. The mathematical approach is based on the solution of Bateman differential equations using a Runge–Kutta–Fehlberg method. Material depletion at constant flux and constant power can be calculated with this software. The inputs include reactor power, time step, initial and final times, order of Taylor Series to calculate time dependent flux, time unit, core material composition at initial condition (consists of light and heavy radioactive materials), acceptable error criterion, decay constants library, cross sections database and calculation type (constant flux or constant power). The atomic density of light and heavy fission products during reactor operation is obtained with high accuracy as the program outputs. The results from this method compared with analytical solution show good agreements

  3. BWR Refill-Reflood Program. Final report

    International Nuclear Information System (INIS)

    Myers, L.L.

    1983-09-01

    The BWR Refill-Reflood Program is part of the continuing Loss of Coolant Accident (LOCA) research in the United States which is jointly sponsored by the Nuclear Regulatory Commission, the Electric Power Research Institute, and the General Electric Company. The current program expanded the focus of this research to include full scale experimental evaluations of multidimensional and multichannel effects during system refill. The program has also made major contributions to the BWR version of the Transient Reactor Analysis Code (TRAC) which has been developed cooperatively with the Idaho National Engineering Laboratory (INEL) for application to BWR transients. A summary description of the complete program is provided including the principal findings and main conclusions of the program. The results of the program have shown that multidimensional and parallel channel effects have the potential to significantly improve the system response over that observed in single channel tests

  4. Operations Management in the Design and Execution of MBA Programs

    Science.gov (United States)

    Busing, Michael E.; Palocsay, Susan W.

    2016-01-01

    Master of business administration (MBA) programs are under intense pressure to improve efficiencies, lower tuition, and offer refreshed curriculum that is of high quality and regarded as relevant by the marketplace. In light of this environment, the authors propose a conceptual framework for effectively employing operations management (OM)…

  5. A V ampersand V Program for a real time Operator Advisor expert system

    International Nuclear Information System (INIS)

    Hajek, B.K.; Hardy, C.R.; Miller, D.W.; Bhatnagar, R.

    1989-01-01

    This report discusses an Operator Advisor (OA) consisting of four integrated expert systems which has been under development at the Ohio State University since 1985. The OA was initially conceived as two independent systems, one to manage procedures for the operator, and the other to diagnose plant faults and to validate sensor data. The OA has used the Perry Nuclear Power Plant simulator as the reference plant. It has been programmed with knowledge gathered from power plant experts and plant documents. Following incremental programming, the OA has been tested off line by running scenarios on the plant simulator and verifying that the OA responded as predicted by the simulator. Specifications have been developed and periodically published in the literature over the past four years. These are currently being collected and expanded upon as part of a formal Verification and Validation (V ampersand V) Program. The V ampersand V Program is defined by three types of documents: specification documents, a V ampersand V document, and procedures to support implementation of the specifications and V ampersand V programs

  6. A V and V program for a real time operator advisor expert system

    International Nuclear Information System (INIS)

    Hajek, B.K.; Hardy, C.R.; Miller, D.W.; Bhatnagar, R.

    1991-01-01

    This paper reports on an Operator Advisor (OA) consisting of four integrated expert systems under development at The Ohio State University since 1985. The OA was initially conceived as two independent systems, one to manage procedures for the operator, and the other to diagnose plant faults and to validate sensor data. The OA has used the Perry Nuclear Power Plant simulator as the reference plant. It has been programmed with knowledge gathered from power plant experts and plant documents. Following incremental programming, the OA has been tested off line by running scenarios on the plant simulator and verifying that the OA responded as predicted by the simulator. Specifications have been developed and periodically published in the literature over the past four years. These are currently being collected and expanded upon as part of a formal Verification and Validation (V and V) Program. The V and V Program is defined by three types of documents: specification documents, a V and V document, and procedures to support implementation of the specifications and V and V program

  7. 46 CFR 71.50-27 - Alternative Hull Examination (AHE) program options: Divers or underwater remotely operated...

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Alternative Hull Examination (AHE) program options...-27 Alternative Hull Examination (AHE) program options: Divers or underwater remotely operated vehicle... operations; (2) Provide permanent hull markings, a temporary grid system of wires or cables spaced not more...

  8. Final environmental statement related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1985-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of River Bend Station, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  9. A Descriptive Study of Wisconsin PK-12 Virtual Public School Program Operations and Management

    Science.gov (United States)

    Banker, Margaret M.

    2012-01-01

    E-Learning as it pertains to public education is in its infancy in America. There is limited research on what operational design, development, and management attributes of virtual school programs foster student achievement. The Wisconsin Department of Instruction has not developed or adopted program standards for E-Learning programs. The purpose…

  10. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  11. EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS

    Science.gov (United States)

    The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...

  12. Obedience to compliance programs and independence for electricity and natural gas system operators. 2009 report

    International Nuclear Information System (INIS)

    2009-12-01

    In France, system operators belong to groups that also conduct business in the energy sector, in fields governed by competition rules. They could therefore be tempted to use their privileged position to their group's benefit, which would disadvantage end consumers. Non-discriminatory access to electricity and gas transmission and distribution networks is at the core of the market opening to competition approach implemented by the European Union since the end of the 1990's. EU and national enactments in force highlight two tools to ensure nondiscrimination: compliance programmes and independence of system operators with regard to their parent companies. Firstly, compliance programs contain measures taken to ensure that discrimination is completely excluded and that their application is subject to appropriate monitoring. Secondly, system operator independence plays a part in preventing discrimination against competitors with other business activities (generation, supply, etc.) within the same group. In application of these enactments, every electricity or natural gas transmission or distribution system operator serving more than 100,000 customers provided CRE, the Energy Regulatory Commission, with their annual reports on the application of their compliance programs. This document is CRE's 2009 report about compliance programmes and independence of electricity and natural gas system operators. Its content can be summarized as follows: 1 - system operator independence serving consumers: Non-discriminatory access to networks is essential for the development of competitive markets, System operator compliance programs and independence act as a guarantee of nondiscrimination, The legal context in which these issues are addressed is set to change in the near future; 2 - A high level of obedience to compliance programs: The continued efforts of system operators prevent discrimination, CR E has assessed distribution system operators by means of a mystery

  13. Study 2.6 operations analysis mission characterization

    Science.gov (United States)

    Wolfe, R. R.

    1973-01-01

    An analysis of the current operations concepts of NASA and DoD is presented to determine if alternatives exist which may improve the utilization of resources. The final product is intended to show how sensitive these ground rules and design approaches are relative to the total cost of doing business. The results are comparative in nature, and assess one concept against another as opposed to establishing an absolute cost value for program requirements. An assessment of the mission characteristics is explained to clarify the intent, scope, and direction of this effort to improve the understanding of what is to be accomplished. The characterization of missions is oriented toward grouping missions which may offer potential economic benefits by reducing overall program costs. Program costs include design, development, testing, and engineering, recurring unit costs for logistic vehicles, payload costs. and direct operating costs.

  14. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    International Nuclear Information System (INIS)

    Bissani, M; O'Kelly, D S

    2006-01-01

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to provide color-enhanced gemstones but is

  15. Joint Assessment of ETRR-2 Research Reactor Operations Program, Capabilities, and Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bissani, M; O' Kelly, D S

    2006-05-08

    A joint assessment meeting was conducted at the Egyptian Atomic Energy Agency (EAEA) followed by a tour of Egyptian Second Research Reactor (ETRR-2) on March 22 and 23, 2006. The purpose of the visit was to evaluate the capabilities of the new research reactor and its operations under Action Sheet 4 between the U.S. DOE and the EAEA, ''Research Reactor Operation'', and Action Sheet 6, ''Technical assistance in The Production of Radioisotopes''. Preliminary Recommendations of the joint assessment are as follows: (1) ETRR-2 utilization should be increased by encouraging frequent and sustained operations. This can be accomplished in part by (a) Improving the supply-chain management for fresh reactor fuel and alleviating the perception that the existing fuel inventory should be conserved due to unreliable fuel supply; and (b) Promulgating a policy for sample irradiation priority that encourages the use of the reactor and does not leave the decision of when to operate entirely at the discretion of reactor operations staff. (2) Each experimental facility in operation or built for a single purpose should be reevaluated to focus on those that most meet the goals of the EAEA strategic business plan. Temporary or long-term elimination of some experimental programs might be necessary to provide more focused utilization. There may be instances of emerging reactor applications for which no experimental facility is yet designed or envisioned. In some cases, an experimental facility may have a more beneficial use than the purpose for which it was originally designed. For example, (a) An effective Boron Neutron Capture Therapy (BNCT) program requires nearby high quality medical facilities. These facilities are not available and are unlikely to be constructed near the Inshas site. Further, the BNCT facility is not correctly designed for advanced research and therapy programs using epithermal neutrons. (b) The ETRR-2 is frequently operated to

  16. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Industrial and Medical Nuclear Safety; Tingle, W. [Dept. of Environment, Health, and Natural Resources, Raleigh, NC (United States). Div. of Radiation Protection

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ``Applications for the Use of Sealed Sources in Portable Gauging Devices,`` and in NMSs Policy and guidance Directive 2-07, ``Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.`` This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications.

  17. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    International Nuclear Information System (INIS)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A.; Tingle, W.

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ''Applications for the Use of Sealed Sources in Portable Gauging Devices,'' and in NMSs Policy and guidance Directive 2-07, ''Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.'' This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications

  18. Final Environmental assessment for the Uranium Lease Management Program

    International Nuclear Information System (INIS)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE's ''best interest'' is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI)

  19. Final Environmental assessment for the Uranium Lease Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  20. Pecan Street Grid Demonstration Program. Final technology performance report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-02-10

    This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol

  1. The Westinghouse Hanford Company Operational Environmental Monitoring Program CY-93

    International Nuclear Information System (INIS)

    Schmidt, J.W.

    1993-10-01

    The Operational Environmental Monitoring Program (OEMP) provides facility-specific environmental monitoring to protect the environment adjacent to facilities under the responsibility of Westinghouse Hanford Company (WHC) and assure compliance with WHC requirements and local, state, and federal environmental regulations. The objectives of the OEMP are to evaluate: compliance with federal (DOE, EPA), state, and internal WHC environmental radiation protection requirements and guides; performance of radioactive waste confinement systems; and trends of radioactive materials in the environment at and adjacent to nuclear facilities and waste disposal sites. This paper identifies the monitoring responsibilities and current program status for each area of responsibility

  2. Final argument relating to the Canadian nuclear power program

    International Nuclear Information System (INIS)

    Robertson, J.A.L.

    1978-05-01

    This report is the second brief, and one of a number of documents, submitted by Atomic Energy of Canada Limited (AECL) to the Ontario Royal Commission on Electric Power Planning. It is intended to update the original brief (AECL--5800) with respect to those matters that emerged during the course of the hearings and which had not been fully anticipated in that brief, as well as to summarize the AECL position on the various issues. To enable it to qualify as a ''final argument'' it contains only evidence or material that has been presented to the Royal Commission and is provided with marginal notations identifying the source of each section. It is AECL's position that the Canadian nuclear power program provides a safe, proven and efficient means of making a needed contribution to electricity supply, while strengthening the economy through the deployment of indigenous technology and resources. (author)

  3. DOE University Reactor Sharing Program. Final technical report for 1996--1997

    International Nuclear Information System (INIS)

    Chappas, W.J.; Adams, V.G.

    1998-01-01

    The Department of Energy University Reactor Sharing Program at University of Maryland, College Park (UMCP) has, once again, stimulated a broad use of the reactor and radiation facilities by undergraduate and graduate students, visitors, and professionals. Participants are exposed to topics such as nuclear engineering, radiation safety, and nuclear reactor operations. This information is presented through various means including tours, slide presentations, experiments, and discussions. Student research using the MUTR is also encouraged. In addition, the Reactor Sharing Program here at the University of Maryland does not limit itself to the confines of the TRIGA reactor facility. Incorporated in the program are the Maryland University Radiation Effects Laboratory, and the UMCP 2 x 4 Thermal Hydraulic Loop. These facilities enhance and give an added dimension to the tours and experiments. The Maryland University Training Reactor (MUTR) and the associated laboratories are made available to any interested institution six days a week on a scheduled basis. Most institutions are scheduled at the time of their first request--a reflection of their commitment to the Reactor Sharing Program. The success of the past years by no means guarantees future success. Therefore, the reactor staff is more aggressively pursuing its outreach program, especially with junior colleges and universities without reactor or radiation facilities; more aggressively developing demonstration and training programs for students interested in careers in nuclear power and radiation technology; and more aggressively up-grading the reactor facilities--not only to provide a better training facility but to prepare for relicensing in the year 2000

  4. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  5. Monitoring of good practices programs and independence for electricity and natural gas system operators. Report 2012

    International Nuclear Information System (INIS)

    2013-09-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 8. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2012. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2012 and audits carried out by the CRE services in these companies in 2012

  6. Monitoring of good practices programs and independence for electricity and natural gas system operators. 2010 report

    International Nuclear Information System (INIS)

    2011-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 6. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2010. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2010 and audits carried out by the CRE services in these companies in 2010

  7. Connected Vehicle Pilot Deployment Program phase 1 : security management operating concept : New York City : final report.

    Science.gov (United States)

    2016-05-18

    This document describes the Security Management Operating Concept (SMOC) for the New York City Department of Transportation (NYCDOT) Connected Vehicle Pilot Deployment (CVPD) Project. This SMOC outlines the security mechanisms that will be used to pr...

  8. Thermal model of laser-induced skin damage: computer program operator's manual. Final report, September 1976--April 1977

    Energy Technology Data Exchange (ETDEWEB)

    Takata, A.N.

    1977-12-01

    A user-oriented description is given of a computer program for predicting temperature rises, irreversible damage, and degree of burns caused to skin by laser exposures. This report describes the parameters necessary to run the program and provides suggested values for the parameters. Input data are described in detail as well as the capabilities and limitations of the program. (Author)

  9. Surveillance strategy for an extended operating cycle in commercial nuclear reactors

    International Nuclear Information System (INIS)

    McHenry, R.S.; Moore, T.J.; Maurer, J.H.; Todreas, N.E.

    1997-01-01

    The impetus for improved economic performance of commercial nuclear power plants can be partially satisfied by increasing plant capacity factors through operating cycle extension. One aspect of an operating cycle extension effort is the modification of plant surveillance programs to complete required regulatory and investment protection surveillance activities within the extended planned outage schedule. The goal of this paper is to introduce a general strategy for existing power plants to transition their surveillance programs to an extended operating cycle up to 48 months in length, and to test the feasibility of this strategy through the complete analysis of the surveillance programs at operating BWR and PWR case study plants. The reconciliation of surveillances at these plants demonstrates that surveillance performance will not preclude 48 month operating cycles. Those surveillance activities that could not be resolved to an extended cycle are identified for further study. Finally, a number of general issues are presented that should be considered before implementing a cycle extension effort

  10. Surveillance strategy for an extended operating cycle in commercial nuclear reactors

    International Nuclear Information System (INIS)

    McHenry, R.S.; Moore, T.J.; Maurer, J.H.; Todreas, N.E.

    1997-01-01

    The impetus for improved economic performance of commercial nuclear power plants can be partially satisfied by increasing plant capacity factors through operating cycle extension. One aspect of an operating cycle extension effort is the modification of plant surveillance programs to complete required regulatory and investment protection surveillance activities within the extended planned outage schedule. The goal is to introduce a general strategy for existing power plants to transition their surveillance programs to an extended operating cycle up to 48 months in length, and to test the feasibility of this strategy through the complete analysis of the surveillance programs at operating BWR and PWR case study plants. The reconciliation of surveillances at these plants demonstrates that surveillance performance will not preclude 48 month operating cycles. Those surveillance activities that could not be resolved to an extended cycle are identified for further study. Finally, a number of general issues are presented that should be considered before implementing a cycle extension effort

  11. Final Technical Report, reEnergize Program

    Energy Technology Data Exchange (ETDEWEB)

    Wamstad-Evans, Kristi [City of Omaha; Williams, Eric [City of Omaha; Kubicek, Jason [City of Omaha

    2013-12-27

    The reEnergize Program helped to build a market for residential and commercial energy evaluations and upgrades. The program provided incentives to encourage participants to save energy, save money, and make their homes and businesses more safe, healthy, and comfortable. As part of the Better Buildings Neighborhood Program (BBNP), the successful investment of this $10 million grant toward market development was the first grant funding collaboration between the cities of Omaha and Lincoln. Through more than three years of work, thousands of participants, contractors, and community members worked together to make the reEnergize Program a demonstration of how to “Build Energy Smart Communities.”

  12. Continued advancement of the programming language HAL to an operational status

    Science.gov (United States)

    1971-01-01

    The continued advancement of the programming language HAL to operational status is reported. It is demonstrated that the compiler itself can be written in HAL. A HAL-in-HAL experiment proves conclusively that HAL can be used successfully as a compiler implementation tool.

  13. Experimental RA reactor operation with 80% enriched fuel - Program of experimental operation: a) Program of experimental operation with 80% enriched fuel at low power, b) contents of the experimental operation with 80% enriched fuel at higher power levels; Program probnog rada: a) Program probnog rada reaktora sa 80% obogacenim gorivom na malim snagama, b) sadrzaj programa probnog rada reaktora RA sa 80% obogacenim gorivom na vecim snagama

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Sotic, O; Skoric, M; Cupac, S; Bulovic, V; Maric, I; Marinkov, L [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-10-15

    Highly enriched (80%) uranium oxide fuel was regularly used in the mixed reactor core with the 2% enriched fuel since 1976. The most important changes related to reactor operation, in comparison with the original design project were related to reactor core fuelling schemes. At the end of 1979 reactor was shutdown due to the corrosion coating noticed on some fuel elements and due to decrease quality of the heavy water. Subsequently the Sanitary inspector of Serbia has prohibited further reactor operation. Restart of the reactor will not be a simple continuation of operation. It is indispensable to perform complete experimental program including measurements of critical parameters at different power levels for the core with fresh 80% enriched fuel. The aim of this document is to obtain working permission and its contents are in agreement with the procedure demanded by the Safety Committee of the Institute. It includes results of optimization and safety analysis for the initial reactor core. Since the permission for restart is not obtained, a separate RA reactor safety report is prepared in addition to the program for experimental operation. This report includes: detailed program for reactor experimental operation with 80% enriched fuel in the core at low power levels, and contents of the experimental operation with 80% enriched fuel in the core at higher power levels. [Serbo-Croat] Od decembra 1976. godine redovno je korisceno 80% obogaceno gorivo u mesanoj resetki reaktorskog jezgra sa 2% obogacenim gorivom. Najvece izmene na reaktoru u odnosu na originalni projekat izvrsene su u nacinu rukovanja gorivom. Krajem marta 1979. godine obustavljen je rad reaktora usled naslaga na gorivnim elementima i loseg stanja teske vode. Naknadno je izdata zabrana za rad reaktora od strane Sanitarnog inspektora SR Srbije. Ponovno pustanje reaktora u rad nece biti jednostavan nastavak rada. Neophodno je da se izvede kompletan program merenja kriticnih parametara i drugih

  14. Influence of year-on-year performance on final degree classification in a chiropractic master's degree program.

    Science.gov (United States)

    Dewhurst, Philip; Rix, Jacqueline; Newell, David

    2016-03-01

    We explored if any predictors of success could be identified from end-of-year grades in a chiropractic master's program and whether these grades could predict final-year grade performance and year-on-year performance. End-of-year average grades and module grades for a single cohort of students covering all academic results for years 1-4 of the 2013 graduating class were used for this analysis. Analysis consisted of within-year correlations of module grades with end-of-year average grades, linear regression models for continuous data, and logistic regression models for predicting final degree classifications. In year 1, 140 students were enrolled; 85.7% of students completed the program 4 years later. End-of-year average grades for years 1-3 were correlated (Pearson r values ranging from .75 to .87), but the end-of-year grades for years 1-3 were poorly correlated with clinic internship performance. In linear regression, several modules were predictive of end-of-year average grades for each year. For year 1, logistic regression showed that the modules Physiology and Pharmacology and Investigative Imaging were predictive of year 1 performance (odds ratio [OR] = 1.15 and 0.9, respectively). In year 3, the modules Anatomy and Histopathology 3 and Problem Solving were predictors of the difference between a pass/merit or distinction final degree classification (OR = 1.06 and 1.12, respectively). Early academic performance is weakly correlated with final-year clinic internship performance. The modules of Anatomy and Histopathology year 3 and Problem Solving year 3 emerged more consistently than other modules as being associated with final-year classifications.

  15. 77 FR 43290 - Children's Health Insurance Program (CHIP); Final Allotments to States, the District of Columbia...

    Science.gov (United States)

    2012-07-24

    ... 0938-AR45 Children's Health Insurance Program (CHIP); Final Allotments to States, the District of... and expand health insurance coverage to uninsured, low-income children under the Children's Health... under title XXI of the Social Security Act (the Act). States may implement Children's Health Insurance...

  16. Driver Education for Motorcycle Operation. Final Report.

    Science.gov (United States)

    Council, Forrest M.; And Others

    A three-year pilot project was conducted to evaluate the feasibility of implementing a statewide off-road motorcycle training program for beginning drivers in North Carolina. The first year of the program involved approximately 422 students from five locations, the second year involved seven sites across the State. The three basic criteria for the…

  17. Workplace Wellness Programs Study: Final Report

    OpenAIRE

    Mattke, Soeren; Liu, Hangsheng; Caloyeras, John; Huang, Christina Y.; Van Busum, Kristin R.; Khodyakov, Dmitry; Shier, Victoria

    2013-01-01

    This article investigates the characteristics of workplace wellness programs, their prevalence, their impact on employee health and medical cost, facilitators of their success, and the role of incentives in such programs.

  18. Programs for Testing Processor-in-Memory Computing Systems

    Science.gov (United States)

    Katz, Daniel S.

    2006-01-01

    The Multithreaded Microbenchmarks for Processor-In-Memory (PIM) Compilers, Simulators, and Hardware are computer programs arranged in a series for use in testing the performances of PIM computing systems, including compilers, simulators, and hardware. The programs at the beginning of the series test basic functionality; the programs at subsequent positions in the series test increasingly complex functionality. The programs are intended to be used while designing a PIM system, and can be used to verify that compilers, simulators, and hardware work correctly. The programs can also be used to enable designers of these system components to examine tradeoffs in implementation. Finally, these programs can be run on non-PIM hardware (either single-threaded or multithreaded) using the POSIX pthreads standard to verify that the benchmarks themselves operate correctly. [POSIX (Portable Operating System Interface for UNIX) is a set of standards that define how programs and operating systems interact with each other. pthreads is a library of pre-emptive thread routines that comply with one of the POSIX standards.

  19. H2moves.eu Scandinavia. ''Experience from operating a 70 MPa hydrogen refuelling station in Oslo''. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Sloth, M.

    2013-02-15

    As part of the H2MOVES Scandinavia project H2 Logic were to construct a large scale hydrogen refuelling station (HRS) in Oslo providing hydrogen for FCEV's from Daimler and Hyundai in the project. The effort has provided extensive results and lessons learned across the entire process from site selection, HRS design and manufacturing to the final installation and operation. An extensive site screening of more than 30 sites in Oslo was firstly conducted to identify the most optimal location for the HRS. A suitable site was identified at the research organisation SINTEF in Gaustad in the western part of Oslo. The location was strategically well located with regards to the other HRS's in the city ensuring good refuelling coverage in Oslo. The HRS was manufactured, installed and operated by H2 Logic based on the company's H2Station technology. The HRS provides 70MPa refuelling in accordance with the SAE J2601, and operation results have confirmed refuelling times consistently below four minutes for a full tank. The HRS includes onsite electrolysis production providing a 20kg/day base load supply, with potentially additional trucking-in of hydrogen up to a total capacity of 200kg/day. The installation of the HRS took in total 10 days, from arrival at site, until first refuelling was conducted. This included local inspection by third parties and authorities as well as several days of hydrogen production and compression to reach the necessary refuelling pressure. Before opening a refuelling recommendation process was successfully conducted by Daimler. The HRS opened on 21st November 2011 and has been operated for 13,5 months during the remainder project period (ending December 2012). The HRS is expected to continue operation beyond the project. Below are shown the major operation results from the HRS during the project: 1) 701 kg dispensed; 2) 313 refueling's conducted; 3) Average availability of 97% during first half of 2012; 4) 53% of all down

  20. Leadership Development Program Final Project

    Science.gov (United States)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  1. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  2. Final environmental statement related to operation of White Mesa Uranium Project, Energy Fuels Nuclear, Inc

    International Nuclear Information System (INIS)

    1979-05-01

    Environmental impact statements are presented under the following headings: the existing environment; mining and milling operations; air quality; land use; mineral resources; soils; radiological impacts; socioeconomic impacts; environmental effects of accidents; monitoring programs; unavoidable adverse environmental impacts; relation between short-term uses of the environment and long-term productivity; irreversible and irretrievable commitments

  3. Spent fuel sabotage test program, characterization of aerosol dispersal : interim final report

    International Nuclear Information System (INIS)

    Gregson, Michael Warren; Brockmann, John E.; Loiseau, Olivier; Klennert, Lindsay A.; Nolte, Oliver; Molecke, Martin Alan; Autrusson, Bruno A.; Koch, Wolfgang; Pretzsch, Gunter Guido; Brucher, Wenzel; Steyskal, Michele D.

    2008-01-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program provides source-term data that are relevant to plausible sabotage scenarios in relation to spent fuel transport and storage casks and associated risk assessments. We present details and significant results obtained from this program from 2001 through 2007. Measured aerosol results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; measurements of volatile fission product species enhanced sorption--enrichment factors onto respirable particles; and, status on determination of the spent fuel ratio, SFR, needed for scaling studies. Emphasis is provided on recent Phase 3 tests using depleted uranium oxide pellets plus non-radioactive fission product dopants in surrogate spent fuel test rodlets, plus the latest surrogate cerium oxide results and aerosol laboratory supporting calibration work. The DUO 2 , CeO 2 , plus fission product dopant aerosol particle results are compared with available historical data. We also provide a status review on continuing preparations for the final Phase 4 in this program, tests using individual short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. The source-term data, aerosol results, and program design have been tailored to support and guide follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments. This spent fuel sabotage, aerosol test program was performed primarily at Sandia National Laboratories, with support provided by both the U.S. Department of Energy and the Nuclear Regulatory Commission. This program has significant input from, and is cooperatively supported and

  4. Spent fuel sabotage test program, characterization of aerosol dispersal : interim final report.

    Energy Technology Data Exchange (ETDEWEB)

    Gregson, Michael Warren; Brockmann, John E.; Loiseau, Olivier (Institut de Radioprotection et de Surete Nucleaire, France); Klennert, Lindsay A.; Nolte, Oliver (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Molecke, Martin Alan; Autrusson, Bruno A. (Institut de Radioprotection et de Surete Nucleaire, France); Koch, Wolfgang (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Pretzsch, Gunter Guido (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Brucher, Wenzel (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Steyskal, Michele D.

    2008-03-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program provides source-term data that are relevant to plausible sabotage scenarios in relation to spent fuel transport and storage casks and associated risk assessments. We present details and significant results obtained from this program from 2001 through 2007. Measured aerosol results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; measurements of volatile fission product species enhanced sorption--enrichment factors onto respirable particles; and, status on determination of the spent fuel ratio, SFR, needed for scaling studies. Emphasis is provided on recent Phase 3 tests using depleted uranium oxide pellets plus non-radioactive fission product dopants in surrogate spent fuel test rodlets, plus the latest surrogate cerium oxide results and aerosol laboratory supporting calibration work. The DUO{sub 2}, CeO{sub 2}, plus fission product dopant aerosol particle results are compared with available historical data. We also provide a status review on continuing preparations for the final Phase 4 in this program, tests using individual short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. The source-term data, aerosol results, and program design have been tailored to support and guide follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments. This spent fuel sabotage, aerosol test program was performed primarily at Sandia National Laboratories, with support provided by both the U.S. Department of Energy and the Nuclear Regulatory Commission. This program has significant input from, and is cooperatively

  5. Facebook and the Final Practicum: The Impact of Online Peer Support in the Assistant Teacher Program

    Science.gov (United States)

    Paris, Lisa F.; Boston, Julie; Morris, Julia

    2015-01-01

    Australian pre-service teachers (PST) frequently report feeling isolated and vulnerable during the high stakes Assistant Teacher Program (ATP) final practicum. Mentoring and online learning communities have been shown to offer effective support during periods in which pre-service and beginning teachers feel challenged. As social media…

  6. 77 FR 17496 - Fisheries and Habitat Conservation and Migratory Birds Programs; Final Land-Based Wind Energy...

    Science.gov (United States)

    2012-03-26

    ...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Final Land-Based Wind...) established the Wind Turbine Guidelines Advisory Committee (Committee) under the Federal Advisory Committee... concern over certain issues such as the effects of wind turbine noise on wildlife, these issues have not...

  7. Development and Operation of International Nuclear Education/Training Program and HRD Cooperation Network

    International Nuclear Information System (INIS)

    Lee, E. J.; Min, B. J.; Han, K. W.

    2006-12-01

    The primary result of the project is the establishment of a concept of International Nuclear R and D Academy that integrates the on-going long term activity for international nuclear education/training and a new activity to establish an international cooperation network for nuclear human resources development. For this, the 2007 WNU Summer Institute was hosted with the establishment of an MOU and subsequent preparations. Also, ANENT was promoted through development of a cyber platform for the ANENT web-portal, hosting the third ANENT Coordination Committee meeting, etc. Then a cooperation with universities in Vietnam was launched resulting in preparation of an MOU for the cooperation. Finally, a relevant system framework was established and required procedures were drafted especially for providing students from developing countries with long term education/training programs (e.g. MS and Ph D. courses). The international nuclear education/training programs have offered 13 courses to 182 people from 43 countries. The overall performance of the courses was evaluated to be outstanding. In parallel, the establishment of an MOU for the cooperation of KOICA-IAEA-KAERI courses to ensure their stable and systematic operation. Also, an effort was made to participate in FNCA. Atopia Hall of the International Nuclear Training and Education Center (INTEC) hosted 477 events (corresponding to 18,521 participants) and Nuri Hall (guesthouse) accommodated 4,616 people in 2006. This shows a steady increase of the use rate since the opening of the center, along with a continuous improvement of the equipment

  8. Development and Operation of International Nuclear Education/Training Program and HRD Cooperation Network

    Energy Technology Data Exchange (ETDEWEB)

    Lee, E J; Min, B J; Han, K W [and others

    2006-12-15

    The primary result of the project is the establishment of a concept of International Nuclear R and D Academy that integrates the on-going long term activity for international nuclear education/training and a new activity to establish an international cooperation network for nuclear human resources development. For this, the 2007 WNU Summer Institute was hosted with the establishment of an MOU and subsequent preparations. Also, ANENT was promoted through development of a cyber platform for the ANENT web-portal, hosting the third ANENT Coordination Committee meeting, etc. Then a cooperation with universities in Vietnam was launched resulting in preparation of an MOU for the cooperation. Finally, a relevant system framework was established and required procedures were drafted especially for providing students from developing countries with long term education/training programs (e.g. MS and Ph D. courses). The international nuclear education/training programs have offered 13 courses to 182 people from 43 countries. The overall performance of the courses was evaluated to be outstanding. In parallel, the establishment of an MOU for the cooperation of KOICA-IAEA-KAERI courses to ensure their stable and systematic operation. Also, an effort was made to participate in FNCA. Atopia Hall of the International Nuclear Training and Education Center (INTEC) hosted 477 events (corresponding to 18,521 participants) and Nuri Hall (guesthouse) accommodated 4,616 people in 2006. This shows a steady increase of the use rate since the opening of the center, along with a continuous improvement of the equipment.

  9. Final Technical Report_Clean Energy Program_SLC-SELF

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Glenn; Coward, Doug

    2014-01-22

    This is the Final Technical Report for DOE's Energy Efficiency and Conservation Block Grant, Award No. DE-EE0003813, submitted by St. Lucie County, FL (prime recipient) and the Solar and Energy Loan Fund (SELF), the program's third-party administrator. SELF is a 501(c)(3) and a certified Community Development Financial Institution (CDFI). SELF is a community-based lending organization that operates the Clean Energy Loan Program, which focuses on improving the overall quality of life of underserved populations in Florida with an emphasis on home energy improvements and cost-effective renewable energy alternatives. SELF was launched in 2010 through the creation of the non-profit organization and with a $2.9 million Energy Efficiency and Conservation Block (EECBG) grant from the U.S. Department of Energy (DOE). SELF has its main office and headquarters in St. Lucie County, in the region known as the Treasure Coast in East-Central Florida. St. Lucie County received funding to create SELF as an independent non-profit institution, outside the control of local government. This was important for SELF to create its identity as an integral part of the business community and to help in its quest to become a Community Development Financial Institution (CDFI). This goal was accomplished in 2013, allowing SELF to focus on its mission to increase energy savings while serving markets that have struggled to find affordable financial assistance. These homeowners are most impacted by high energy costs. Energy costs are a disproportionate percentage of household expenses for low to moderate income (LMI) households. Electricity costs have been steadily rising in Florida by nearly 5% per year. Housing in LMI neighborhoods often includes older inefficient structures that further exacerbate the problem. Despite the many available clean energy solutions, most LMI property owners do not have the disposable income or equity in their homes necessary to afford the high upfront cost

  10. MOST-7 program for calculation of nonstationary operation modes of the nuclear steam generating plant with WWER

    International Nuclear Information System (INIS)

    Mysenkov, A.I.

    1979-01-01

    The MOST-7 program intended for calculating nonstationary emergency models of a nuclear steam generating plant (NSGP) with a WWER reactor is considered in detail. The program consists of the main MOST-7 subprogram, two main subprograms and 98 subprograms-functions. The MOST-7 program is written in the FORTRAN language and realized at the BESM-6 computer. Program storage capacity in the BESM-6 amounts to 73400 words. Primary information input into the program is carried out by means of information input operator from punched cards and DATA operator. Parameter lists, introduced both from punched cards and by means of DATA operator are tabulated. The procedure of calculational result output into printing and plotting devices is considered. Given is an example of calculating the nonstationary process, related to the loss of power in six main circulating pumps for NSGP with the WWER-440 reactor

  11. 8th Asia oceania congress of nuclear medicine and biology final program abstracts

    International Nuclear Information System (INIS)

    2004-01-01

    The eighth Asia and Oceania congress of nuclear medicine and biology was held in Beijing, China, October 9-13 2004. The congress also held satellite meeting in Hong Kong SAR, China October 16-17 2004 and in Shanghai, China October 15 2005 respectively. The congress was sponsored by Chinese Society of Nuclear Medicine and organized by Asia and Oceania Federation of Nuclear Medicine and Biology. The final program includes 379 pieces abstracts, whose contents contain nuclear medicine diagnosis and therapy and biology

  12. SisterTalk: final results of a culturally tailored cable television delivered weight control program for Black women

    OpenAIRE

    Risica, Patricia Markham; Gans, Kim M; Kumanyika, Shiriki; Kirtania, Usree; Lasater, Thomas M

    2013-01-01

    Background Obesity among Black women continues to exceed that of other women. Most weight loss programs created without reference to specific cultural contexts are less effective for Black than White women. Weight control approaches accessible to Black women and adapted to relevant cultural contexts are important for addressing this problem. This paper reports the final results of SisterTalk, the randomized controlled trial of a cable TV weight control program oriented toward Black women. Met...

  13. A two-stage stochastic programming approach for operating multi-energy systems

    DEFF Research Database (Denmark)

    Zeng, Qing; Fang, Jiakun; Chen, Zhe

    2017-01-01

    This paper provides a two-stage stochastic programming approach for joint operating multi-energy systems under uncertainty. Simulation is carried out in a test system to demonstrate the feasibility and efficiency of the proposed approach. The test energy system includes a gas subsystem with a gas...

  14. Nuclear Engine System Simulation (NESS). Version 2.0: Program user's guide. Final Report

    International Nuclear Information System (INIS)

    Pelaccio, D.G.; Scheil, C.M.; Petrosky, L.

    1993-03-01

    This Program User's Guide discusses the Nuclear Thermal Propulsion (NTP) engine system design features and capabilities modeled in the Nuclear Engine System Simulation (NESS): Version 2.0 program (referred to as NESS throughout the remainder of this document), as well as its operation. NESS was upgraded to include many new modeling capabilities not available in the original version delivered to NASA LeRC in Dec. 1991, NESS's new features include the following: (1) an improved input format; (2) an advanced solid-core NERVA-type reactor system model (ENABLER 2); (3) a bleed-cycle engine system option; (4) an axial-turbopump design option; (5) an automated pump-out turbopump assembly sizing option; (6) an off-design gas generator engine cycle design option; (7) updated hydrogen properties; (8) an improved output formnd (9) personal computer operation capability. Sample design cases are presented in the user's guide that demonstrate many of the new features associated with this upgraded version of NESS, as well as design modeling features associated with the original version of NESS

  15. Lessons learned from Spain's nuclear program

    International Nuclear Information System (INIS)

    Garcia Rodriguez, A.

    1993-01-01

    The commercial nuclear program in Spain dates back to the beginning of the 1960s. There are currently nine units in operation, one more has been decommissioned and a further five are in different phases of construction but under nuclear moratorium since 1983. This article gives a general overview of the program, the criteria applied, what it has meant to and required of the industry and, finally, what lessons have been learned. (author) 2 figs

  16. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  17. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  18. Evaluation of PWR's operating experience. Significant events which influenced French nuclear power program

    International Nuclear Information System (INIS)

    Dupuis, M.C.

    1986-10-01

    This report discusses developments or changes in safety policy (whether statutory or otherwise) and in plant design and operation, which, in many cases, correlate. When considering these events, it is important to bear in mind the standardization policy characterizing the French nuclear power program, and implying central decision-making, both for the safety authorities and the operating utility [fr

  19. Operation of Wastewater Treatment Plants. Volume 1. A Field Study Training Program. Third Edition. Revised.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    The purpose of this wastewater treatment field study training program is to: (1) develop new qualified wastewater treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  20. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  1. Experimental fusion power reactor conceptual design study. Final report. Volume II

    International Nuclear Information System (INIS)

    Baker, C.C.

    1976-12-01

    This document is the final report which describes the work carried out by General Atomic Company for the Electric Power Research Institute on a conceptual design study of a fusion experimental power reactor (EPR) and an overall EPR facility. The primary objective of the two-year program was to develop a conceptual design of an EPR that operates at ignition and produces continuous net power. A conceptual design was developed for a Doublet configuration based on indications that a noncircular tokamak offers the best potential of achieving a sufficiently high effective fuel containment to provide a viable reactor concept at reasonable cost. Other objectives included the development of a planning cost estimate and schedule for the plant and the identification of critical R and D programs required to support the physics development and engineering and construction of the EPR. This volume contains the following sections: (1) reactor components, (2) auxiliary systems, (3) operations, (4) facility design, (5) program considerations, and (6) conclusions and recommendations

  2. Transuranic-contaminated solid waste Treatment Development Facility. Final safety analysis report

    International Nuclear Information System (INIS)

    Warner, C.L.

    1979-07-01

    The Final Safety Analysis Report (FSAR) for the Transuranic-Contaminated Solid-Waste Treatment Facility has been prepared in compliance with the Department of Energy (DOE) Manual Chapter 0531, Safety of Nonreactor Nuclear Facilities. The Treatment Development Facility (TDF) at the Los Alamos Scientific Laboratory is a research and development facility dedicated to the study of radioactive-waste-management processes. This analysis addresses site assessment, facility design and construction, and the design and operating characteristics of the first study process, controlled air incineration and aqueous scrub off-gas treatment with respect to both normal and accident conditions. The credible accidents having potentially serious consequences relative to the operation of the facility and the first process have been analyzed and the consequences of each postulated credible accident are presented. Descriptions of the control systems, engineered safeguards, and administrative and operational features designed to prevent or mitigate the consequences of such accidents are presented. The essential features of the operating and emergency procedures, environmental protection and monitoring programs, as well as the health and safety, quality assurance, and employee training programs are described

  3. Transuranic-contaminated solid waste Treatment Development Facility. Final safety analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Warner, C.L. (comp.)

    1979-07-01

    The Final Safety Analysis Report (FSAR) for the Transuranic-Contaminated Solid-Waste Treatment Facility has been prepared in compliance with the Department of Energy (DOE) Manual Chapter 0531, Safety of Nonreactor Nuclear Facilities. The Treatment Development Facility (TDF) at the Los Alamos Scientific Laboratory is a research and development facility dedicated to the study of radioactive-waste-management processes. This analysis addresses site assessment, facility design and construction, and the design and operating characteristics of the first study process, controlled air incineration and aqueous scrub off-gas treatment with respect to both normal and accident conditions. The credible accidents having potentially serious consequences relative to the operation of the facility and the first process have been analyzed and the consequences of each postulated credible accident are presented. Descriptions of the control systems, engineered safeguards, and administrative and operational features designed to prevent or mitigate the consequences of such accidents are presented. The essential features of the operating and emergency procedures, environmental protection and monitoring programs, as well as the health and safety, quality assurance, and employee training programs are described.

  4. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    International Nuclear Information System (INIS)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A.; Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A.; Turland, B.D.; Dobson, G.P.; Siccama, A.; Ikonen, K.; Parozzi, F.; Kolev, N.; Caira, M.

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues

  5. Medicare and Medicaid programs: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; electronic reporting pilot; Inpatient Rehabilitation Facilities Quality Reporting Program; revision to Quality Improvement Organization regulations. Final rule with comment period.

    Science.gov (United States)

    2012-11-15

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2013 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program, the ASC Quality Reporting (ASCQR) Program, and the Inpatient Rehabilitation Facility (IRF) Quality Reporting Program. We are continuing the electronic reporting pilot for the Electronic Health Record (EHR) Incentive Program, and revising the various regulations governing Quality Improvement Organizations (QIOs), including the secure transmittal of electronic medical information, beneficiary complaint resolution and notification processes, and technical changes. The technical changes to the QIO regulations reflect CMS' commitment to the general principles of the President's Executive Order on Regulatory Reform, Executive Order 13563 (January 18, 2011).

  6. Final report on evaluation of cyclocraft support of oil and gas operations in wetland areas

    Energy Technology Data Exchange (ETDEWEB)

    Eggington, W.J.; Stevens, P.M.; John, C.J.; Harder, B.J.; Lindstedt, D.M.

    1994-10-01

    The cyclocraft is a proven hybrid aircraft, capable of VTOL, lifting heavy and bulky loads, highly controllable, having high safety characteristics and low operating costs. Mission Research Corporation (MRC), under Department of Energy sponsorship, is evaluating the potential use of cyclocraft in the transport of drill rigs, mud, pipes and other materials and equipment, in a cost effective and environmentally safe manner, to support oil and gas drilling, production, and transportation operations in wetland areas. Based upon the results of an earlier parametric study, a cyclocraft design, having a payload capacity of 45 tons and designated H.1 Cyclocraft, was selected for further study, including the preparation of a preliminary design and a development plan, and the determination of operating costs. This report contains all of the results derived from the program to evaluate the use of cyclocraft in the support of oil and gas drilling and production operations in wetland areas.

  7. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  8. Efficient dynamic optimization of logic programs

    Science.gov (United States)

    Laird, Phil

    1992-01-01

    A summary is given of the dynamic optimization approach to speed up learning for logic programs. The problem is to restructure a recursive program into an equivalent program whose expected performance is optimal for an unknown but fixed population of problem instances. We define the term 'optimal' relative to the source of input instances and sketch an algorithm that can come within a logarithmic factor of optimal with high probability. Finally, we show that finding high-utility unfolding operations (such as EBG) can be reduced to clause reordering.

  9. Development of a thermionic magnicon amplifier at 11.4 GHz. Final report for period May 16, 1995 - May 15, 2001

    International Nuclear Information System (INIS)

    Gold, Steven H.; Fliflet, Arne W.

    2001-01-01

    This is the final report on the research program ''Development of a Thermionic Magnicon Amplifier at 11.4 GHz,'' which was carried out by the Plasma Physics Division of the Naval Research Laboratory. Its goal was to develop a high-power, frequency-doubling X-band magnicon amplifier, an advanced scanning-beam amplifier, for use in future linear colliders. The final design parameters were 61 MW at 11.424 GHz, 59 dB gain, 59% efficiency, 1 microsecond pulselength and 10 Hz repetition rate. At the conclusion of this program, the magnicon was undergoing high-power conditioning, having already demonstrated high-power operation, phase stability, a linear drive curve, a small operational frequency bandwidth and a spectrally pure, single-mode output

  10. Final Radiological Assessment of External Exposure for CLEAR-Line Americium Recovery Operations

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Adam C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Belooussova, Olga N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hetrick, Lucas Duane [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-11-12

    Los Alamos National Laboratory is currently planning to implement an americium recovery program. The americium, ordinarily isotopically pure 241Am, would be extracted from existing Pu materials, converted to an oxide and shipped to support fabrication of americium oxide-beryllium neutron sources. These operations would occur in the currently proposed Chloride Extraction and Actinide Recovery (CLEAR) line of glove boxes. This glove box line would be collocated with the currently-operational Experimental Chloride Extraction Line (EXCEL). The focus of this document is to provide an in-depth assessment of the currently planned radiation protection measures and to determine whether or not further design work is required to satisfy design-goal and ALARA requirements. Further, this document presents a history of americium recovery operations in the Department of Energy and high-level descriptions of the CLEAR line operations to provide a basis of comparison. Under the working assumptions adopted by this study, it was found that the evaluated design appears to mitigate doses to a level that satisfies the ALARA-in-design requirements of 10 CFR 835 as implemented by the Los Alamos National Laboratory procedure P121. The analyses indicate that extremity doses would also meet design requirements. Dose-rate calculations were performed using the radiation transport code MCNP5 and doses were estimated using a time-motion study developed in consort with the subject matter expert. A copy of this report and all supporting documentation are located on the Radiological Engineering server at Y:\\Rad Engineering\\2013 PROJECTS\\TA-55 Clear Line.

  11. Medicare program; Medicare depreciation, useful life guidelines--HCFA. Final rule.

    Science.gov (United States)

    1983-08-18

    These final rules amend Medicare regulations to clarify which useful life guidelines may be used by providers of health care services to determine the useful life of a depreciable asset for Medicare reimbursement purposes. Current regulations state that providers must utilize the Departmental useful life guidelines or, if none have been published by the Department, either the American Hospital Association (AHA) useful life guidelines of 1973 of IRS guidelines. We are eliminating the reference to IRS guidelines because these are now outdated for Medicare purposes since they have been rendered obsolete either by the IRS or by statutory change. We are also deleting the specific reference to the 1973 AHA guidelines since these guidelines are updated by the AHA periodically. In addition, we are clarifying that certain tax legislation on accelerated depreciation, passed by Congress, does not apply to the Medicare program.

  12. Federal Employees Health Benefits Program: Removal of Eligible and Ineligible Individuals From Existing Enrollments. Final rule.

    Science.gov (United States)

    2018-01-23

    The United States Office of Personnel Management (OPM) is issuing a final rule amending Federal Employees Health Benefits (FEHB) Program regulations to provide a process for removal of certain identified individuals who are found not to be eligible as family members from FEHB enrollments. This process would apply to individuals for whom there is a failure to provide adequate documentation of eligibility when requested. This action also amends Federal Employees Health Benefits (FEHB) Program regulations to allow certain eligible family members to be removed from existing self and family or self plus one enrollments.

  13. Final status of the salt repository project waste package program experimental database

    International Nuclear Information System (INIS)

    Thornton, B.M.; Reimus, P.W.

    1988-03-01

    This report describes the final status of the Salt Repository Project Waste Package Program Experimental Database. The data base serves as a clearinghouse for all data collected within the Waste Package Program (WPP) and its predecessor programs at Pacific Northwest Laboratory (PNL). The database was maintained using RS/1 database management software. Documented assurance that the entries in the database were consistent with experimental records was provided by having each experimentalist inspect the entries and signify that they were in agreement with the records. The inspection and signoff were done per PNL technical procedures. Data for which it was impossible to obtain the experimentalist's inspection and signature were segregated from the rest of the database, although they could still be accessed by WPP staff. The WPPED contains two groups of subdirectories. One group contains data taken prior to the installation of quality assurance procedures at PNL. The other group of subdirectories contains data taken under the NQA-1 procedures since their installation in April 1985. As part of closeout activities in the Salt Repository Project, the WPP database has been archived onto magnetic media. The data in the database are available by request on magnetic media or in hardcopy form. 2 refs

  14. Operational-safety advantages of LMFBR's: the EBR-II experience and testing program

    International Nuclear Information System (INIS)

    Sackett, J.I.; Lindsay, R.W.; Golden, G.H.

    1982-01-01

    LMFBR's contain many inherent characteristics that simplify control and improve operating safety and reliability. The EBR-II design is such that good advantage was taken of these characteristics, resulting in a vary favorable operating history and allowing for a program of off-normal testing to further demonstrate the safe response of LMFBR's to upsets. The experience already gained, and that expected from the future testing program, will contribute to further development of design and safety criteria for LMFBR's. Inherently safe characteristics are emphasized and include natural convective flow for decay heat removal, minimal need for emergency power and a large negative reactivity feedback coefficient. These characteristics at EBR-II allow for ready application of computer diagnosis and control to demonstrate their effectiveness in response to simulated plant accidents. This latter testing objective is an important part in improvements in the man-machine interface

  15. Proposal of a procedure of the operative program optimization of production in the petroleum refinery of PCK / Oder, Federal Republic of Germany

    Directory of Open Access Journals (Sweden)

    Josef Maily

    2015-11-01

    Full Text Available The blended of raw petroleum is an operation that can be optimized and it is based on a great quantity of knowledge and experience. The planning of these operations consists in obtaining a mixture of components with different properties and specification as octane, flow, level of sulfur etc., besides keeping in mind the existent capacities and the demand. This is considered important in this type of industries, since their profitability depends on finding the good mixture, due to the variability of the prices in the final products. The objective of this paper is to determine the good variant of production of the refinery PCK/Oder, Federal Republic of Germany that achieves the maximum of utilities, by means of the Parametric Lineal Programming. The preliminary validation, presents advantages in the utilities of until 4 %, in comparison with the use of the current method.

  16. Proposed amendment to the final decision document for the hydrazine blending and storage facility, interim response action

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-25

    From April through August 1989, a bench-/pilot-scale testing program was conducted to evaluate whether qualified manufactures of ultraviolet (UV)/chemical oxidation equipment could reduce the concentrations of hydrazine fuel compounds (hydrazine, monomethyl hydrazine (MMH), and unsymmetrical dimethyl hydrazine (UDMH)) and n-nitrosodimethylamine (NDMA) in the wastewater to action levels identified in the Final Decision Document. A secondary objective of this testing program was to generate design and operational information for use during the full-scale startup program.

  17. Final report of the Department of Energy pilot internship program on radioactive waste at Vanderbilt University (September 1, 1993-08/31, 1994)

    Energy Technology Data Exchange (ETDEWEB)

    Frank Parker

    1999-08-31

    This final report summarizes Vanderbilt's ten year program in radioactive waste management. The report describes the interns selected for the program, the interns' course of study, and their assignments.

  18. Standarized radiological hazard analysis for a broad based operational safety program

    International Nuclear Information System (INIS)

    Wadman, W.W. III; Andrews, L.L.

    1992-01-01

    The Radiological hazard Analysis (RHA) Manual provides a methodology and detailed guidance for systematic analysis of radiological hazards over a broad spectrum of program functions, housed in a wide variety of facilities. Radiological programs at LANL include: research and experimentation; routine materials operations; production; non-destructive examination or testing; isotope and machine produced radiations; chemistry; and metallurgy. The RHA permits uniform evaluation of hazard types over a range of several orders of magnitude of hazard severity. The results are used to estimate risk, evaluate types and level or resource allocations, identify deficiencies, and plan corrective actions for safe working environments. 2 refs

  19. Standardized radiological hazard analysis for a broad based operational safety program

    International Nuclear Information System (INIS)

    Wadman, W. III; Andrews, L.

    1992-01-01

    The Radiological Hazard Analysis (RHA) Manual provides a methodology and detailed guidance for systematic analysis of radiological hazards over a broad spectrum of program functions, housed in a wide variety of facilities. Radiological programs at LANL include: research and experimentation routine materials operations; production; non-destructive examination or testing; isotope and machine produced radiations; chemistry; and metallurgy. The RHA permits uniform evaluation of hazard types over a range of several orders of magnitude of hazard severity. The results are used to estimate risk, evaluate types and level of resource allocations, identify deficiencies, and plan corrective actions for safe working environments. (author)

  20. A Study on Evaluation of Training Program for MCR Operators of SMART Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyun Jun; Lee, Joon Ku; Jeong, Kwang Il [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    It is important to develop a training program by simulators in main control room of nuclear power plants because there is no an operation expert and no operating experience in the pre-construction phase of nuclear power plants. It is also necessary to develop a training program and its evaluation method taking human error into account. The purpose of this study is developing evaluation model of simulators. In a training program, once training requirements are selected, evaluation of training is as important as its implementation. Training effectiveness is available value in a simulator-based environment. The main control room of SMART (System-integrated Modular Advanced ReacTor) is consist of workstation, visual display units such as LDP and FPD based on digital systems. Cognitive behaviors of a high level are required to operators in these man-machine interface system (MMIS). Therefore, it is essential to identify training requirements and to develop its evaluation model. Virtual Environments such as a simulator have utilized by a lot of industries and companies for training and accident prevention. Simulators have three primary benefits. The first is that training by simulators is less expensive than those in real environment. The second is that simulators enable safety enhancement using systematic training program. The third is that simulators provide a preliminary to prevent human error. It is significant to apply TER, TCR, TCE in evaluation of training effect. It is expected that these could be applied to revise training criteria and enable to consider efficiency in terms of cost and benefit.

  1. A Study on Evaluation of Training Program for MCR Operators of SMART Simulator

    International Nuclear Information System (INIS)

    Park, Hyun Jun; Lee, Joon Ku; Jeong, Kwang Il

    2015-01-01

    It is important to develop a training program by simulators in main control room of nuclear power plants because there is no an operation expert and no operating experience in the pre-construction phase of nuclear power plants. It is also necessary to develop a training program and its evaluation method taking human error into account. The purpose of this study is developing evaluation model of simulators. In a training program, once training requirements are selected, evaluation of training is as important as its implementation. Training effectiveness is available value in a simulator-based environment. The main control room of SMART (System-integrated Modular Advanced ReacTor) is consist of workstation, visual display units such as LDP and FPD based on digital systems. Cognitive behaviors of a high level are required to operators in these man-machine interface system (MMIS). Therefore, it is essential to identify training requirements and to develop its evaluation model. Virtual Environments such as a simulator have utilized by a lot of industries and companies for training and accident prevention. Simulators have three primary benefits. The first is that training by simulators is less expensive than those in real environment. The second is that simulators enable safety enhancement using systematic training program. The third is that simulators provide a preliminary to prevent human error. It is significant to apply TER, TCR, TCE in evaluation of training effect. It is expected that these could be applied to revise training criteria and enable to consider efficiency in terms of cost and benefit

  2. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  3. FLECHT SEASET program. Final report

    International Nuclear Information System (INIS)

    Hochreiter, L.E.

    1985-11-01

    This report presents the highlights and main findings of the USNRC, EPRI, and Westinghouse cooperative FLECHT SEASET program. The report indicates areas in which the results of the program can contribute to revising the current licensing requirements for Loss of Coolant (LOCA) safety analysis for PWRs. Also identified are several technical areas in which the new FLECHT SEASET data and analysis can lead to improved safety analysis modeling, and thereby to predicted PWR response for postulated accident scenarios. Significant progress has been made in the modeling areas of nonequilibrium dispersed two-phase flow during reflood. Improved models and understanding of this rod bundle cooling regime are summarized in this report. Another important result of the FLECHT SEASET program arises from the natural circulation test series, which investigated single-phase, two-phase, and reflux condensation cooling modes of a scaled PWR under small-break LOCA conditions. The tests and subsequent analysis constitute one of few complete sets of data for these cooling modes in which full-height, multitube steam generators with sufficient instrumentation were used to examine primary-to-secondary heat transfer in the generators. It is believed that the natural circulation test data will be extremely useful to benchmark the improved post-TMI small-break LOCA computer codes. 170 figs., 13 tabs

  4. Medicare program; clarification of Medicare's accrual basis of accounting policy--HCFA. Final rule.

    Science.gov (United States)

    1995-06-27

    This final rule revises the Medicare regulations to clarify the concept of "accrual basis of accounting" to indicate that expenses must be incurred by a provider of health care services before Medicare will pay its share of those expenses. This rule does not signify a change in policy but, rather, incorporates into the regulations Medicare's longstanding policy regarding the circumstances under which we recognize, for the purposes of program payment, a provider's claim for costs for which it has not actually expended funds during the current cost reporting period.

  5. US Department of Energy, Richland Operations Office Integrated Safety Management System Program Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight

  6. Implementation of a quality control program for a 6 MeV linear photon accelerator

    International Nuclear Information System (INIS)

    Berdaky, Mafalda F.; Caldas, Linda V.E.

    2001-01-01

    This paper describes the operational characteristics of the final process of implementation of a quality control program using routine mechanical and radiation tests. The quality control program was performed during 35 months and demonstrated the excellent stability of this accelerator. (author)

  7. Storage and distribution/Linear programming for storage operations

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, D

    1978-07-15

    The techniques of linear programing to solve storage problems as applied in a tank farm tie-in with refinery throughput operation include: (1) the time-phased model which works on storage and refinery operations input parameters, e.g., production, distribution, cracking, etc., and is capable of representing product stockpiling in slack periods to meet future peak demands, and investigating alternative strategies such as exchange deals and purchase and leasing of additional storage, and (2) the Monte Carlo simulation method, which inputs parameters, e.g., arrival of crude products at refinery, tankage size, likely demand for products, etc., as probability distributions rather than single values, and is capable of showing the average utilization of facilities, potential bottlenecks, investment required to achieve an increase in utilization, and to enable the user to predict total investment, cash flow, and profit emanating from the original financing decision. The increasing use of computer techniques to solve refinery and storage problems is attributed to potential savings resulting from more effective planning, reduced computer costs, ease of access and more usable software. Diagrams.

  8. Risk averse optimal operation of a virtual power plant using two stage stochastic programming

    International Nuclear Information System (INIS)

    Tajeddini, Mohammad Amin; Rahimi-Kian, Ashkan; Soroudi, Alireza

    2014-01-01

    VPP (Virtual Power Plant) is defined as a cluster of energy conversion/storage units which are centrally operated in order to improve the technical and economic performance. This paper addresses the optimal operation of a VPP considering the risk factors affecting its daily operation profits. The optimal operation is modelled in both day ahead and balancing markets as a two-stage stochastic mixed integer linear programming in order to maximize a GenCo (generation companies) expected profit. Furthermore, the CVaR (Conditional Value at Risk) is used as a risk measure technique in order to control the risk of low profit scenarios. The uncertain parameters, including the PV power output, wind power output and day-ahead market prices are modelled through scenarios. The proposed model is successfully applied to a real case study to show its applicability and the results are presented and thoroughly discussed. - Highlights: • Virtual power plant modelling considering a set of energy generating and conversion units. • Uncertainty modelling using two stage stochastic programming technique. • Risk modelling using conditional value at risk. • Flexible operation of renewable energy resources. • Electricity price uncertainty in day ahead energy markets

  9. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Science.gov (United States)

    2013-07-19

    ... Administration 14 CFR Part 193 [Docket No.: FAA-2013-0375] Technical Operations Safety Action Program (T-SAP) and... Disclosure. SUMMARY: The FAA is proposing that safety information provided to it under the T-SAP, established... to the FAA under the T-SAP and ATSAP, so the FAA can learn about and address aviation safety hazards...

  10. Operational programs in forest management and priority in the utilization of remote sensing

    Science.gov (United States)

    Douglass, R. W.

    1978-01-01

    A speech is given on operational remote sensing programs in forest management and the importance of remote sensing in forestry is emphasized. Forest service priorities in using remote sensing are outlined.

  11. Medicaid program; premiums and cost sharing. Final rule; delay of effective data and reopening of comment period.

    Science.gov (United States)

    2009-01-27

    In accordance with the memorandum of January 20, 2009, from the Assistant to the President and Chief of Staff, entitled "Regulatory Review Plan," this action temporarily delays for 60 days the effective date of the final rule entitled "Medicaid Program; Premiums and Cost Sharing" (73 FR 71828). The temporary 60-day delay in effective date is necessary to give Department officials the opportunity for further review and consideration of new regulations. In addition, this action reopens the comment period on the policies set out in the November 25, 2008 final rule.

  12. CHOOZ-A expert assessment program

    International Nuclear Information System (INIS)

    Bouat, M.; Godin, R.

    1993-01-01

    CHOOZ-A Nuclear Power Plant, the first French-Belgian PWR unit (300 MWe) was definitively shut down at the end of October 1991, after 24 years in operation. Since summer 1991, the steering committee of the French (EDF) Lifetime Project has initiated a large inquiry to the different technical specialists of EDF and external organizations, trying to define a wide expert assessment program on this plant. The aim is to improve the knowledge of aging mechanisms such as those observed on the 52 PWR French nuclear power plants (900 and 1,300 MWe), and contribute to the validation of non-destructive in-service testing methods. This paper presents the retained CHOOZ-A expert assessment program and technical lines followed during its set up. First major project stages are described, then technical choices are explained, and at last the final program is presented with the specific content of each expert assessment. The definitive program is scheduled for a three year period starting at the moment of final shutdown license acquisition, with a provisional total budget of more than US $10 million

  13. Citizen radiation monitoring program for the TMI area

    International Nuclear Information System (INIS)

    Baratta, A.J.; Gricar, B.G.; Jester, W.A.

    1981-07-01

    The purpose of the program was to develop a system for citizens to independently measure radiation levels in and around their communities. This report describes the process by which the Program was developed and operated. It also presents the methods used to select and train the citizens in making and interpreting the measurements. The test procedures used to select the equipment for the program are described as are the results of the testing. Finally, the actual monitoring results are discussed along with the citizens' reactions to the program

  14. Citizen radiation monitoring program for the TMI area

    Energy Technology Data Exchange (ETDEWEB)

    Baratta, A.J.; Gricar, B.G.; Jester, W.A.

    1981-07-01

    The purpose of the program was to develop a system for citizens to independently measure radiation levels in and around their communities. This report describes the process by which the Program was developed and operated. It also presents the methods used to select and train the citizens in making and interpreting the measurements. The test procedures used to select the equipment for the program are described as are the results of the testing. Finally, the actual monitoring results are discussed along with the citizens' reactions to the program.

  15. Computer programs in BASIC language for graphite furnace atomic absorption using the method of additions. Part 1. Operating instructions

    International Nuclear Information System (INIS)

    Boyle, W.G. Jr.; Ryan, D.P.

    1979-01-01

    These instructions describe how to use BASIC language programs to process data from atomic absorption spectrophotometers using the graphite furnace and the method of additions calibration technique. The instructions cover loading the programs, responding to computer prompts, choosing among various options for processing the data, performing operations with an automatic sampler, and producing reports. How the programs interact with each other is also explained. Examples of computer/operator dialogue are presented for typical cases. In addition, a concise set of operating instructions is included as an appendix

  16. Qualification requirements and training programs for nonreactor nuclear facility personnel in the Operations Division of the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Preston, E.L.; Culbert, W.H.; Baldwin, M.E.; McCormack, K.E.; Rivera, A.L.; Setaro, J.A.

    1985-11-01

    This document describes the program for training, retraining, and qualification of nonreactor nuclear operators in the Operations Division of the Oak Ridge National Laboratory. The objective of the program is to provide the Operators and Supervisors of nuclear facilities the knowledge and skills needed to perform assigned duties in a safe and efficient manner and to comply with US Department of Energy Order 5480.1A Chapter V. This order requires DOE nuclear facilities to maintain formal training programs for their operating staff and documentation of that training.

  17. Qualification requirements and training programs for nonreactor nuclear facility personnel in the Operations Division of the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Preston, E.L.; Culbert, W.H.; Baldwin, M.E.; McCormack, K.E.; Rivera, A.L.; Setaro, J.A.

    1985-11-01

    This document describes the program for training, retraining, and qualification of nonreactor nuclear operators in the Operations Division of the Oak Ridge National Laboratory. The objective of the program is to provide the Operators and Supervisors of nuclear facilities the knowledge and skills needed to perform assigned duties in a safe and efficient manner and to comply with US Department of Energy Order 5480.1A Chapter V. This order requires DOE nuclear facilities to maintain formal training programs for their operating staff and documentation of that training

  18. Achievements of the French laser uranium enrichment program and final demonstrations

    International Nuclear Information System (INIS)

    Bordier, G.

    2006-01-01

    conclusive 4 years program 2000-2003 for a complete technical demonstration of the SILVA process. The aim of this paper is to present this 4 years program and the good results obtained, giving rise to the conclusion that SILVA process is available at full scale on a scientific and technological viewpoint. A brief recall of the SILVA process is is first presented. The paper has the following contents: 1. Introduction; 2. The basics of the SILVA process; 3. Planning the 4 years program (2000-2003); 4. R and D Results; Axis 1: Separator; Axis 2: Propagation; Axis 3: Illuminating the vapor; 5. Menphis; 6. Axis 4: Integration results; 7. Results of the November 2003 DIL Experiment;SILVA Process Evaporator; Lasers and irradiation; 8. Conclusion. To summarize, one stresses that all the goals defined in 2000, in order to correctly save the knowledge and pave the way for a potential industrial use of the SILVA uranium enrichment process, have been fulfilled at the end of the 2000-2003 four years program. The results of both the preliminary R and D on separator and illumination, and of the integration large scale experiments (204 kg of enriched uranium around 2.5 %), demonstrate the capability of SILVA to produce large amounts of enriched uranium in one evaporator. The laser propagation computation, experimentally validated on MENPHIS, confirms furthermore the ability of SILVA to be scaled up to a large number of evaporators in series. Thus, the scientific and technical feasibility of the process is now established. SILVA is furthermore compact, modular, has low energy consumption and high depletion performances, although some further developments would be necessary to improve the profitability of the process. Finally, the following items are pointed out: 1. SILVA is a batch process and has an operating to investment cost ratio higher than centrifugation. It would be profitable to confirm the reliability on several full performance long runs while increasing the mean batch duration

  19. Java Programming Language

    Science.gov (United States)

    Shaykhian, Gholam Ali

    2007-01-01

    The Java seminar covers the fundamentals of Java programming language. No prior programming experience is required for participation in the seminar. The first part of the seminar covers introductory concepts in Java programming including data types (integer, character, ..), operators, functions and constants, casts, input, output, control flow, scope, conditional statements, and arrays. Furthermore, introduction to Object-Oriented programming in Java, relationships between classes, using packages, constructors, private data and methods, final instance fields, static fields and methods, and overloading are explained. The second part of the seminar covers extending classes, inheritance hierarchies, polymorphism, dynamic binding, abstract classes, protected access. The seminar conclude by introducing interfaces, properties of interfaces, interfaces and abstract classes, interfaces and cailbacks, basics of event handling, user interface components with swing, applet basics, converting applications to applets, the applet HTML tags and attributes, exceptions and debugging.

  20. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  1. State child health; revisions to the regulations implementing the State Children's Health Insurance Program. Interim final rule with comment period; revisions, delay of effective date, and technical amendments to final rule.

    Science.gov (United States)

    2001-06-25

    Title XXI authorizes the State Children's Health Insurance Program (SCHIP) to assist State efforts to initiate and expand the provision of child health assistance to uninsured, low-income children. On January 11, 2001 we published a final rule in the Federal Register to implement SCHIP that has not gone into effect. This interim final rule further delays the effective date, revises certain provisions and solicits public comment, and makes technical corrections and clarifications to the January 2001 final rule based on further review of the comments received and applicable law. Only the provisions set forth in this document have changed. All other provisions set forth in the January 2001 final rule will be implemented without change.

  2. Monitoring of good practices programs and independence for electricity and natural gas system operators - 2013-2014 report

    International Nuclear Information System (INIS)

    Monteil, Anne; Casadei, Cecile

    2014-12-01

    This report results from the analysis of 'reports on the implementation of good practices programs' transmitted to the CRE (the French Commission for energy regulation) at the beginning of 2014 by those in charge of operators compliance. The report is structured in two thematic files, completed by individual analyses of the situation of each operator. These thematic files respectively address the processing of claims by the different natural gas operators, and the processing by ERDF of requests of connection to the grid of renewable energy production installations in the South-West of France. For each operator, the analysis comprises an assessment of independence, and an assessment of the compliance with the good practice program by the operator. For these individual analyses, the report makes a distinction between distribution network operators (ERDF, GRDF, Electricite de Strasbourg, Geredis, SRD, URM, Regaz-Bordeaux, Reseau GDS) and transport network operators (RTE, GRTgaz, TIGF)

  3. Final Approval of California Air Plan Revision; Antelope Valley Air Quality Management District; VOCs From Motor Vehicle Assembly Coating Operations

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Antelope Valley Air Quality Management District (AVAQMD) portion of the California SIP concerning the emissions of volatile organic compounds (VOCs) from motor vehicle assembly coating operations.

  4. 2008 report on the Monitoring of good practices programs and independence for electricity and natural gas system operators

    International Nuclear Information System (INIS)

    2009-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 4. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2008. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2008 and audits carried out by the CRE services in these companies in 2008

  5. The Denver region traffic signal system improvement program : planning for management and operations

    Science.gov (United States)

    2009-04-01

    The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...

  6. Development and implementation of the waste diversion program at MDS Nordion's Cobalt Operations Facility

    International Nuclear Information System (INIS)

    Wasiak, T.

    2004-01-01

    Historically, the MDS Nordion (MDSN) Cobalt Operations Facility sent solid waste for disposal to Atomic Energy of Canada Ltd.'s Chalk River Laboratories (AECL-CRL). A large portion of this waste was not contaminated. Because this non-contaminated waste originated in the 'active area' of the MDSN facility, it was routinely disposed of as low-level active waste. In 2002, MDSN undertook an initiative to develop and implement a more sophisticated and more economical waste management program. The Waste Diversion Program (WDP) ensures continued environmental and public protection, and reduces the demand on Canada's limited capacity for storage of radioactive material and the associated operating costs. The goal of the WDP is to reduce the volume of waste currently being shipped to AECL-CRL's Waste Management Operation as low-level active waste. The presentation discusses key elements of both the development and the implementation of WDP. It focuses on the following areas: the regulatory environment surrounding the waste disposal issues in Canada and abroad. Methods used by MDSN for determination of radionuclides, which could be present in the facility. Choice of equipment and calculation of individual alarm levels for each identified radionuclide. Key elements of the practical implementation of the program. CNSC Regulatory approval process. The bottom line - dollars and cents. The primary objective of the WDP is to ensure that only waste, which meets regulatory requirements, is diverted from the solid active waste stream. This has been successfully accomplished in MDSN's Cobalt Operations Facility. The objective of the presentation is to share the knowledge and experience obtained in the development process, and thus provide a guideline for other nuclear facilities interested in establishing similar proactive and cost effective programs. (author)

  7. Remote operated vehicle with CO2 blasting (ROVCO2): Volume 1. Final report, September 1993--July 1996

    International Nuclear Information System (INIS)

    1996-06-01

    This report documents the second phase of the Remote Operated Vehicle with CO 2 Blasting (ROVCO 2 ) Program. The ROVCO 2 Program's goal is to develop and demonstrate a tool to improve the productivity of concrete floor decontamination. The second phase integrated non-developmental subsystems on to the ROVCO 2 system and performed quantitative decontamination effectiveness, productivity, and reliability testings. The report documents these development activities and the analysis of cost and performance. The results show that the ROVCO 2 system is an efficient decontamination tool

  8. Summary of the Semiscale Program, 1965-1986

    International Nuclear Information System (INIS)

    Loomis, G.G.

    1987-07-01

    This document summarizes significant results from the Semiscale Program, which examined pressurized water reactor (PWR) safety issues from 1965 to 1986. Most of these issues were related to plant response during loss-of-coolant accidents and operational transients. The Semiscale program utilized a series of non-nuclear, scaled, PWR plant simulators to provide thermal-hydraulic data at prototypical pressures and temperatures for a wide range of nuclear safety issues. Presented are: a historical perspective of the Semiscale Program relative to reactor safety with a catalog of the Semiscale experimental facilities and data bases, the relationship of Semiscale results to 10 CFR Part 50 (Appendix K), the impact of Semiscale results on scaling experimental results to full sized operating plants, a summary of safety issues that were addressed by Semiscale testing as they arose throughout the operational lifetime of Semiscale, the contributions of the Semiscale Program to safety technology, a description of phenomena observed during Semiscale testing, the impact of Semiscale data on code development and assessment, the applicability of the Semiscale data base for code development and assessment, and finally, major conclusions and accomplishments of the Semiscale program

  9. Factor best of ALWR features into operating plants

    International Nuclear Information System (INIS)

    Strauss, S.D.

    1997-01-01

    This article describes how many features of advanced light-water reactor designs are applicable to existing plants. While no new plants are being ordered, some advanced features have found their way into existing units and have been incorporated into the design of plants being built overseas. Ironically, two of the advanced light-water reactor (ALWR) plant designs--the ABWR and the System 80+--were finally approved by the US Nuclear Regulatory Commission (NRC) at the end of last year. Yet US utilities are probably further away from ordering a new nuclear unit than they ever have been. But that doesn't make the program irrelevant. Design advances from this program can affect the economics of nuclear power at a time when owner/operators are striving to compete in a less restrictive market for generation. Advances that can be considered by operating plants emanate from two major programs: (1) the standard plant designs which began in the late 1970s and (2) the ALWR program which sought--successfully, although it took a decade--to precertify designs and lessen the licensing burden on those contemplating a new unit. By using proven technology to simplify plants with higher design margins and enhanced safety features, the ALWR program's goal was to make new plants less expensive, safer, and easier to operate and maintain than their predecessors

  10. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    Science.gov (United States)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  11. Program of experiments for the operating phase of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Simmons, G.R.; Bilinsky, D.M.; Davison, C.C.; Gray, M.N.; Kjartanson, B.H.; Martin, C.D.; Peters, D.A.; Lang, P.A.

    1992-09-01

    The Underground Research Laboratory (URL) is one of the major research and development facilities that AECL Research has constructed in support of the Canadian Nuclear Fuel Waste Management Program. The URL is a unique geotechnical research facility constructed in previously undisturbed plutonic rock, which was well characterized before construction. The site evaluation and construction phases of the URL project have been completed and the operating phase is beginning. A program of operating phase experiments that address AECL's objectives for in situ testing has been selected. These experiments were subjected to an external peer review and a subsequent review by the URL Experiment Committee in 1989. The comments from the external peer review were incorporated into the experiment plans, and the revised experiments were accepted by the URL Experiment Committee. Summaries of both reviews are presented. The schedule for implementing the experiments and the quality assurance to be applied during implementation are also summarized. (Author) (9 refs., 11 figs.)

  12. Approximate Dynamic Programming Solving the Curses of Dimensionality

    CERN Document Server

    Powell, Warren B

    2011-01-01

    Praise for the First Edition "Finally, a book devoted to dynamic programming and written using the language of operations research (OR)! This beautiful book fills a gap in the libraries of OR specialists and practitioners."-Computing Reviews This new edition showcases a focus on modeling and computation for complex classes of approximate dynamic programming problems Understanding approximate dynamic programming (ADP) is vital in order to develop practical and high-quality solutions to complex industrial problems, particularly when those problems involve making decisions in the presence of unce

  13. Candu Energy's Aging and Obsolescence Program and its Application to Operating Facilities and New Plant Design

    International Nuclear Information System (INIS)

    Dam, R.; Gold, R.; McCrea, L.

    2012-01-01

    While plant aging is inevitable, predictable and 'graceful 'aging' behavior can be achieved through the implementation of a comprehensive and integrated Plant Life Management (PLiM) program. Despite organizations like the IAEA and INPO placing more emphasis on equipment reliability, there is still a lack of completely integrated programs in the industry as evidenced by: - Piece-meal, often crisis-driven, implementation comprising many different, partial solutions; - Duplication of effort often seen when different groups work in 'silos'. A strategy which fits with existing plant processes and programs, and which coordinates a broad range of equipment reliability activities is key to achieving the desired results. An example of such a program is the Aging and Obsolescence Program (AOP). AOP follows application of INPO AP-913 guidance for equipment reliability. The program is augmented to include single point vulnerability identification, unified approach to short and long lived components, risk management, spare parts management, and the identification and resolution of obsolescence issues. The systematic nature of the program provides the needed foundation to old and new stations alike. For existing operating stations some of the key uses include outage interval extension, reduced forced outages, and/or outage time reduction, any of which can translate into improving plant performance, competitiveness, and significant dollars saved. Program elements applied to new plant design are commensurate with the industry direction to 'design for reliability', and has allowed Candu Energy to learn and to improve upon what it can offer to operating stations. This paper intends to describe the basic elements of Candu Energy's Aging and Obsolescence Program and will share some of the experience having applied it to existing operating stations, consider applications to support expanding regulatory requirements, and describe the integration into the design of new plants, promoting

  14. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  15. A near-peer teaching program designed, developed and delivered exclusively by recent medical graduates for final year medical students sitting the final objective structured clinical examination (OSCE

    Directory of Open Access Journals (Sweden)

    Sobowale Oluwaseun

    2011-03-01

    Full Text Available Abstract Background The General Medical Council states that teaching doctors and students is important for the care of patients. Our aim was to deliver a structured teaching program to final year medical students, evaluate the efficacy of teaching given by junior doctors and review the pertinent literature. Methods We developed a revision package for final year medical students sitting the Objective Structured Clinical Examination (OSCE. The package was created and delivered exclusively by recent medical graduates and consisted of lectures and small group seminars covering the core areas of medicine and surgery, with a focus on specific OSCE station examples. Students were asked to complete a feedback questionnaire during and immediately after the program. Results One hundred and eighteen completed feedback questionnaires were analysed. All participants stated that the content covered was relevant to their revision. 73.2% stated that junior doctors delivered teaching that is comparable to that of consultant - led teaching. 97.9% stated the revision course had a positive influence on their learning. Conclusions Our study showed that recent medical graduates are able to create and deliver a structured, formal revision program and provide a unique perspective to exam preparation that was very well received by our student cohort. The role of junior doctors teaching medical students in a formal structured environment is very valuable and should be encouraged.

  16. A program to operate the TSI electrical aerosol analyser using an IBM-PC microcomputer - technical background

    International Nuclear Information System (INIS)

    Horton, K.D.; Mitchell, J.P.; Snelling, K.W.

    1988-02-01

    A program has been written to enable the TSI Electrical Aerosol Analyser (EAA model 3030) to be operated using an IBM-PC microcomputer. Although much of the program is based on the software supplied by TSI Inc to collect and process data from the EAA, it incorporates numerous improvements including the option to operate the EAA automatically via a TSI Differential Mobility Particle Sizer interface. When compiled, the program enables the data reduction which takes into account the significant cross-channel sensitivity of the EAA, to be performed in about 30 seconds making it possible to use the EAA to monitor rapid changes in the behaviour of sub-micron aerosol particles. (author)

  17. DOE Matching Grant Program; FINAL

    International Nuclear Information System (INIS)

    Dr Marvin Adams

    2002-01-01

    OAK 270 - The DOE Matching Grant Program provided$50,000.00 to the Dept of N.E. at TAMU, matching a gift of$50,000.00 from TXU Electric. The$100,000.00 total was spent on scholarships, departmental labs, and computing network

  18. State heating oil and propane program. Final report, 1996--1997

    International Nuclear Information System (INIS)

    Hunton, G.

    1997-01-01

    The following is a summary report of the New Hampshire Governor's Office of Energy and Community Services (ECS) participation in the State Heating Oil and Propane Program (SHOPP) for the 1996-97 heating season. SHOPP is a cooperative effort, linking energy offices in East Coast and Midwest states, with the Department of Energy (DOE), Energy Information Administration (EIA) for the purpose of collecting retail price data for heating oil and propane. The program funded by the participating state with a matching grant from DOE. SHOPP was initiated in response to congressional inquires into supply difficulties and price spikes of heating oil and propane associated with the winter of 1989/90. This is important to New Hampshire because heating oil controls over 55% of the residential heating market statewide. Propane controls 10% of the heating market statewide and is widely used in rural areas where Natural GAs is not available. Lower installation cost, convenience, lower operating costs compared to electricity and its perception as a clean heating fuel has increased the popularity of propane in New Hampshire and should continue to do so in the future. Any disruption in supply of these heating fuels to New Hampshire could cause prices to skyrocket and leave many residents in the cold

  19. Building-owners energy-education program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    The objectives of the program are to develop and test market a cogent education program aimed specifically at building owners to help them be more decisive and knowledgeable, and to motivate them to direct their managers and professionals to implement a rational plan for achieving energy conservation in their commercial office buildings and to establish a plan, sponsored by the Building Owners and Managers Association International (BOMA) to implement this educational program on a nation-wide basis. San Francisco, Chicago, and Atlanta were chosen for test marketing a model program. The procedure used in making the energy survey is described. Energy survey results of participating buildings in San Francisco, Chicago, and Atlanta are summarized. (MCW)

  20. Strengthening the fission reactor nuclear science and engineering program at UCLA. Final technical report

    International Nuclear Information System (INIS)

    Okrent, D.

    1997-01-01

    This is the final report on DOE Award No. DE-FG03-92ER75838 A000, a three year matching grant program with Pacific Gas and Electric Company (PG and E) to support strengthening of the fission reactor nuclear science and engineering program at UCLA. The program began on September 30, 1992. The program has enabled UCLA to use its strong existing background to train students in technological problems which simultaneously are of interest to the industry and of specific interest to PG and E. The program included undergraduate scholarships, graduate traineeships and distinguished lecturers. Four topics were selected for research the first year, with the benefit of active collaboration with personnel from PG and E. These topics remained the same during the second year of this program. During the third year, two topics ended with the departure o the students involved (reflux cooling in a PWR during a shutdown and erosion/corrosion of carbon steel piping). Two new topics (long-term risk and fuel relocation within the reactor vessel) were added; hence, the topics during the third year award were the following: reflux condensation and the effect of non-condensable gases; erosion/corrosion of carbon steel piping; use of artificial intelligence in severe accident diagnosis for PWRs (diagnosis of plant status during a PWR station blackout scenario); the influence on risk of organization and management quality; considerations of long term risk from the disposal of hazardous wastes; and a probabilistic treatment of fuel motion and fuel relocation within the reactor vessel during a severe core damage accident

  1. EZLP: An Interactive Computer Program for Solving Linear Programming Problems. Final Report.

    Science.gov (United States)

    Jarvis, John J.; And Others

    Designed for student use in solving linear programming problems, the interactive computer program described (EZLP) permits the student to input the linear programming model in exactly the same manner in which it would be written on paper. This report includes a brief review of the development of EZLP; narrative descriptions of program features,…

  2. Development of a Reliability Program approach to assuring operational nuclear safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques used in other high technology industries is being formulated for potential application in the nuclear power industry. Research findings are discussed. The reliability methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed with several reliability concepts (e.g., quantitative reliability goals, reliability centered maintenance) appearing to be directly transferable. Other tasks in the RP development effort involved the benchmarking and evaluation of the existing nuclear regulations and practices relevant to safety/reliability integration. A review of current risk-dominant issues was also conducted using results from existing probabilistic risk assessment studies. The ongoing RP development tasks have concentrated on defining a RP for the operating phase of a nuclear plant's lifecycle. The RP approach incorporates safety systems risk/reliability analysis and performance monitoring activities with dedicated tasks that integrate these activities with operating, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the RP

  3. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    Energy Technology Data Exchange (ETDEWEB)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A. [Royal Inst. of Tech., Stockholm (Sweden). Div. of Nuclear Power Safety; Helle, M.; Kymaelaeinen, O.; Tuomisto, H. [IVO Power Engineering Ltd., Vantaa (Finland); Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A. [CEA - Grenoble (France); Turland, B.D.; Dobson, G.P. [AEA Technology plc, Dorchester (United Kingdom); Siccama, A. [ECN Nuclear Research, Petten (Netherlands); Ikonen, K. [VTT Energy, Helsinki (Finland); Parozzi, F. [ENEL - SRI/PAM/GRA, Segrate, MI (Italy); Kolev, N. [Siemens AG, Erlangen (Germany); Caira, M. [Univ. of Roma (Italy)

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues.

  4. Final environmental statement related to the operation of Watts Bar Nuclear Plant, Units 1 and 2: Docket Numbers 50-390 and 50-391, Tennessee Valley Authority. Supplement Number 1

    International Nuclear Information System (INIS)

    1995-04-01

    The Final Environmental Statement-Operating License (FES-OL) issued in 1978 represents the Nuclear Regulatory Commission's (NRC's) previous environmental review related to the operation of Watts Bar Nuclear (WBN) Plant. The NRC staff has determined that it is appropriate to re-examine the issues associated with the environmental review before issuance of an operating license. The purpose of this NRC review is to discuss the effects of observed changes in the environment and to evaluate the changes in environmental impacts that have occurred as a result of changes in the WBN Plant design and proposed methods of operations since the last environmental review. A full scope of environmental topics has been evaluated, including regional demography, land and water use, meteorology, terrestrial and aquatic ecology, radiological and non-radiological impacts on humans and the environment, socioeconomic impacts, and environmental justice. The staff concluded that there are no significant changes in the environmental impacts since the NRC 1978 FES-OL from changes in plant design, proposed methods of operations, or changes in the environment. The Tennessee Valley Authority's (TVA's) preoperational and operational monitoring programs were reviewed and found to be appropriate for establishing baseline conditions and ongoing assessments of environmental impacts. The staff also conducted an analysis of plant operation with severe accident mitigation design alternatives (SAMDAs) and concluded that none of the SAMDAs, beyond the three procedural changes that the TVA committed to implement, would be cost-beneficial for further mitigating environmental impacts

  5. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  6. Strategic petroleum reserve, Byran Mound Salt Dome, Brazoria County, Texas. Final environmental impact statement (final supplement to FEA FES 76/77-6)

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-01

    On January 7, 1977, the Federal Energy Administration issued a Final Environmental Impact Statement (EIS) for the development of the Bryan Mound salt dome as a storage site for the Strategic Petroleum Reserve (FES 76/77-6). On October 1, 1977, the U.S. Department of Energy was created and the programs of the Federal Energy Administration were transferred to the new Department. As such, this final supplement is being issued by the Department of Energy. The salt dome is located in Brazoria County, Texas. Since the EIS was published, it has been determined that this arrangement would be inadequate to meet the long term requirements for filling and withdrawing oil at the site, although the disposal of brine to Dow Chemical would be utilized to the maximum extent possible. Therefore, on July 15, 1977, a Draft Supplement to FES 76/77-6 was issued addressing the environmental impacts of construction and operation of two types of brine disposal systems and a new water supply system. This final supplement addresses a brine injection well system and a water intake system. Construction of this new system component would cause temporary disruption to land use, water quality, air quality, and terrestrial and aquatic ecology. The new facilities would permanently change 17 acres of land from its present use. Operation of the systems would have relatively small, short-term impacts. Use of the brine surge pit could adversely affect air quality by emitting hydrocarbon vapors (maximum rate of 51.4 tons per year). Operation of the disposal wells would increase the salinity of an already saline aquifer. All operational impacts would be relatively minor and short-term, occurring only during periods of fill or withdrawal of the storage facility.

  7. Final Environmental Statement related to the operation of Wolf Creek Generating Station, Unit No. 1. Docket No. STN 50-482, Kansas Gas and Electric Company, et al

    International Nuclear Information System (INIS)

    1982-06-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Wolf Creek Generating Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and bridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to the Neosho River are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for the Wolf Creek Generating Station Unit 1

  8. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  9. Resource Programs: Final Environmental Impact Statement

    International Nuclear Information System (INIS)

    1993-02-01

    Every two years, BA prepares a Resource Program, which identifies the resource actions BA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic environmental document that will support decisions made in several future Resource Programs. Environmental documents tiered to this EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. The alternatives represent the range of actions BA could take to meet its load obligations. Each of the alternatives allows BA to meet the almost 5,000 average megawatt load increase that could occur with high load growth, or an equivalent need for resources caused by a combination of load growth and any future loss of resources

  10. Conception of programs for evaluating balance indices of operation of WWER-440 nuclear power plants

    International Nuclear Information System (INIS)

    Zadrazil, J.

    1986-01-01

    The procedures are discussed of writing computation programs for the evaluation of basic technical and economic parameters of the operation of WWER-440 nuclear power plants. The criterion of the evaluation is the maximum power supply to the grid together with the required supply of heat, with the observance of safe operating conditions. Previous procedures of evaluation are compared with present procedures based on the use of a monitoring and evaluation system of the KOMPLEX-URAN 2 M type. The mathematical model of the program is based on balance equations and relations derived for actual measuring systems and is completed with an assessment of the reliability of input and output data. The flow chart is shown of the algorithm for the evaluation of technical and economic parameters, and methods are suggested for improving and extending the program. (J.C.)

  11. Independent auto evaluation of an operative radiological protection program; Autoevaluacion independiente de un programa de proteccion radiologica operativa

    Energy Technology Data Exchange (ETDEWEB)

    Medrano L, M.A.; Rodriguez C, C.C.; Linares R, D.; Zarate M, N.; Zempoalteca B, R. [Gerencia Subsede Sureste Instituto Nacional de Investigaciones Nucleares, 52045 Ocoyoacac, Estado de Mexico (Mexico)]. e-mail: maam@nuclear.inin.mx

    2006-07-01

    The program of operative radiological protection of a nuclear power plant consists of multiple procedures and associate tasks that have as purpose the radiological protection of the workers of the power station. It is for this reason that the constant evaluation of the one it programs it is an important tool in the identification of their weaknesses (and strengths), so they can be assisted appropriately. In this work the main elements of the program of independent auto evaluation of the program of operative radiological protection of the Laguna Verde Central that has been developed and implemented by the National Institute of Nuclear Research are described. (Author)

  12. Engine Lathe Operator. Instructor's Guide. Part of Single-Tool Skills Program Series. Machine Industries Occupations.

    Science.gov (United States)

    New York State Education Dept., Albany. Bureau of Secondary Curriculum Development.

    Expected to help meet the need for trained operators in metalworking and suitable for use in the adult education programs of school districts, in manpower development and training programs, and in secondary schools, this guide consists of four sections: Introduction, General Job Content, Shop Projects, and Drawings for the Projects. General Job…

  13. Programs for Children with Specific Learning Disabilities. P.L. 91-230, Title VI-G Formal Final Evaluation. (Statistical Analysis of Data).

    Science.gov (United States)

    Murphy, Philip J.

    The paper reports the final evaluation of a program for approximately 143 learning disabled (LD) students (grades 6-to-12) from six school districts. A number of test instruments were used to evaluate student progress during the program, including the Wide Range Achievement Test (WRAT), the Durrell Analysis of Reading Difficulty, and the…

  14. Final Environmental Assessment for the Beddown and Flight Operations of Unmanned Aircraft Systems at Grand Forks Air Force Base, North Dakota

    Science.gov (United States)

    2008-08-01

    southwest border and assisted in 3,065 apprehensions and the seizure of 14,240 pounds of marijuana . Four Predator B UASs now operate out of Sierra Vista...Sustainable design concepts emphasize state-of-the-art strategies for site development, efficient water and energy use and improved indoor environmental...improved indoor environmental quality. EA for the Beddown and Flight Operations of Unmanned Aircraft Systems at GFAFB, North Dakota Final 6-1 August

  15. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  16. Advanced Air Transportation Technologies Project, Final Document Collection

    Science.gov (United States)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  17. Program of internal training of the ININ personnel participating in the PERE of the CLV (1998). II. Development and final evaluation

    International Nuclear Information System (INIS)

    Suarez, G.

    1999-04-01

    According to the results of the initial evaluation, he/she was carried out the program of the personnel's of the participant ININ internal training in the PERE of the CLV (1998). The purpose of this report is to describe the development of the one it programs and the results of the final evaluation. (Author)

  18. Final Environmental Statement related to the operation of WPPSS Nuclear Project No. 3 (Docket No. 50-508)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the Washington Public Power System Nuclear Project No. 3 (WNP-3) pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs. Land use and terrestrial and aquatic resource impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial

  19. National HTGR safety program

    International Nuclear Information System (INIS)

    Davis, D.E.; Kelley, A.P. Jr.

    1982-01-01

    This paper presents an overview of the National HTGR Program in the US with emphasis on the safety and licensing strategy being pursued. This strategy centers upon the development of an integrated approach to organizing and classifying the functions needed to produce safe and economical nuclear power production. At the highest level, four plant goals are defined - Normal Operation, Core and Plant Protection, Containment Integrity and Emergency Preparedness. The HTGR features which support the attainment of each goal are described and finally a brief summary is provided of the current status of the principal safety development program supporting the validation of the four plant goals

  20. Modification of reference temperature program in reactor regulating system

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Sung Sik; Lee, Byung Jin; Kim, Se Chang; Cheong, Jong Sik [Korea Power Engineering Company, Inc., Seoul (Korea, Republic of); Kim, Ji In; Doo, Jin Yong [Korea Electric Power Cooperation, Yonggwang (Korea, Republic of)

    1999-12-31

    In Yonggwang nuclear units 3 and 4 currently under commercial operation, the cold temperature was very close to the technical specification limit of 298 deg C during initial startup testing, which was caused by the higher-than-expected reactor coolant system flow. Accordingly, the reference temperature (Tref) program needed to be revised to allow more flexibility for plant operations. In this study, the method of a specific test performed at Yonggwang nuclear unit 4 to revise the Tref program was described and the test results were discussed. In addition, the modified Tref program was evaluated on its potential impacts on system performance and safety. The methods of changing the Tref program and the associated pressurizer level setpoint program were also explained. Finally, for Ulchin nuclear unit 3 and 4 currently under initial startup testing, the effects of reactor coolant system flow rate on the coolant temperature were evaluated from the thermal hydraulic standpoint and an optimum Tref program was recommended. 6 refs., 4 figs., 2 tabs. (Author)

  1. Modification of reference temperature program in reactor regulating system

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Sung Sik; Lee, Byung Jin; Kim, Se Chang; Cheong, Jong Sik [Korea Power Engineering Company, Inc., Seoul (Korea, Republic of); Kim, Ji In; Doo, Jin Yong [Korea Electric Power Cooperation, Yonggwang (Korea, Republic of)

    1998-12-31

    In Yonggwang nuclear units 3 and 4 currently under commercial operation, the cold temperature was very close to the technical specification limit of 298 deg C during initial startup testing, which was caused by the higher-than-expected reactor coolant system flow. Accordingly, the reference temperature (Tref) program needed to be revised to allow more flexibility for plant operations. In this study, the method of a specific test performed at Yonggwang nuclear unit 4 to revise the Tref program was described and the test results were discussed. In addition, the modified Tref program was evaluated on its potential impacts on system performance and safety. The methods of changing the Tref program and the associated pressurizer level setpoint program were also explained. Finally, for Ulchin nuclear unit 3 and 4 currently under initial startup testing, the effects of reactor coolant system flow rate on the coolant temperature were evaluated from the thermal hydraulic standpoint and an optimum Tref program was recommended. 6 refs., 4 figs., 2 tabs. (Author)

  2. Operational Experiences Tuning the ATF2 Final Focus Optics Towards Obtaining a 37nm Electron Beam IP Spot Size

    CERN Document Server

    White, Glen; Woodley, Mark; Bai, Sha; Bambade, Philip; Renier, Yves; Bolzon, Benoit; Kamiya, Yoshio; Komamiya, Sachio; Oroku, Masahiro; Yamaguchi, Yohei; Yamanaka, Takashi; Kubo, Kiyoshi; Kuroda, Shigeru; Okugi, Toshiyuki; Tauchi, Toshiaki; Marin, Eduardo

    2010-01-01

    The primary aim of the ATF2 research accelerator is to test a scaled version of the final focus optics planned for use in next-generation linear lepton colliders. ATF2 consists of a 1.3 GeV linac, damping ring providing lowemittance electron beams (<12pm in the vertical plane), extraction line and final focus optics. The design details of the final focus optics and implementation at ATF2 are presented elsewhere. The ATF2 accelerator is currently being commissioned, with a staged approach to achieving the design IP spot size. It is expected that as we implement more demanding optics and reduce the vertical beta function at the IP, the tuning becomes more difficult and takes longer. We present here a description of the implementation of the tuning procedures and describe operational experiences and performances

  3. Annual report on the Monitoring of good practices programs and independence for electricity and natural gas system operators - 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 2. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2006. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2006 and audits carried out by the CRE services in these companies in 2006

  4. Annual report on the Monitoring of good practices programs and independence for electricity and natural gas system operators - 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Electricity and natural gas transmission system operators (TSO) and distribution system operators (DSO) are regulated operators that provide public service functions for the benefit of the network users and the consumers they serve. Accordingly, European and French law requires that they be under independent and nondiscriminatory obligations. In particular, they must develop a good practices program which includes a range of measures to prevent the risk of discriminatory practices in network access. Pursuant to Article L.134-15 of the Energy Code, the Energy Regulatory Commission (CRE) is publishing this year its 3. annual report on the monitoring of good practices programs and independence for electricity and natural gas system operators for the year 2007. This report is based on analysis of the 'reports on the implementation of good practices programs' submitted to the CRE by the operators in late 2007 and audits carried out by the CRE services in these companies in 2007

  5. Programming a DSP card for generating an ECG signal with possibility of anomalies

    International Nuclear Information System (INIS)

    Hamrouni, Sayma

    2013-01-01

    This project consists of programming a DSP designed to generate an ECG signal with a probability of anomaly. To begin with, we get to know the characteristics of a DSP card and its architecture. As a second step, we programmed the DSP32C using the compiler D3CC associated with Textpad in order to obtain an analog signal in the respective outputs. And then finally, we developed a graphical user interface using the programming software LabVIEW that aims controlling the good operation of DSP. The tests previously made have proved the good operation of the application.

  6. Final environmental impact statement. Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described

  7. Medicare Program: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Short Inpatient Hospital Stays; Transition for Certain Medicare-Dependent, Small Rural Hospitals Under the Hospital Inpatient Prospective Payment System; Provider Administrative Appeals and Judicial Review. Final rule with comment period; final rule.

    Science.gov (United States)

    2015-11-13

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2016 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program and the ASC Quality Reporting (ASCQR) Program. Further, this document includes certain finalized policies relating to the hospital inpatient prospective payment system: Changes to the 2-midnight rule under the short inpatient hospital stay policy; and a payment transition for hospitals that lost their status as a Medicare-dependent, small rural hospital (MDH) because they are no longer in a rural area due to the implementation of the new Office of Management and Budget delineations in FY 2015 and have not reclassified from urban to rural before January 1, 2016. In addition, this document contains a final rule that finalizes certain 2015 proposals, and addresses public comments received, relating to the changes in the Medicare regulations governing provider administrative appeals and judicial review relating to appropriate claims in provider cost reports.

  8. Man-machine interface systems and operator training program for ABWR in Japan

    International Nuclear Information System (INIS)

    Kunito, Susumu

    2004-01-01

    The Tokyo Electric Power Company (TEPCO) has developed a new Main Control Room design for the Advanced Boiling Water Reactor (ABWR) to improve man-machine interface. New configuration of panels and enhanced automation are some of the features of the ABWR type Main Control Room design. Various technologies such as Cathode Ray Tubes (CRTs) and Flat Displays (FDs) with touch-sensitive operations are contributed to the development of the ABWR type control room design. This design will be first applied to Kashiwazaki-Kariwa Nuclear Power Station unit 6 (K-6). To train the operators sufficiently, TEPCO reviewed the operator training program. Compared with the conventional training, new training menu will be added and the training of ABWR operators will be started 6 months earlier. An ABWR simulator is under construction and training using this simulator is scheduled to be started in August 1994, which is 18 months before fuel loading of K-6. We are reviewing malfunction modes on the simulator. (author)

  9. Validity and design of environmental surveillance systems for operating nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Eichholz, G.G.

    1977-12-01

    The composition and procedures of environmental surveillance programs at completed and operating nuclear power plants have been examined with respect to their validity, continuing significance and cost. It was found that many programs contain components that are mainly an extension of preoperational baseline measurements that need not be continued indefinitely and that others lack the statistical validity to make their continued application meaningful. To identify the practical limits imposed by counting statistics and realistic equipment capacity measurements were done on iodine-131 and cesium-137 containing samples to establish detectability limits and proportionate costs for sample preparation and counting. It was found that under commercial conditions effective detectability limits and expected confidence limits were substantially higher than those mentioned in NRC Regulatory Guides. This imposes a need for either selecting fewer samples and counting them for longer times or accepting a lesser accuracy on more samples, within the bounds of reasonable cost per sample

  10. 14 CFR 1214.1105 - Final ranking.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Final ranking. 1214.1105 Section 1214.1105... Recruitment and Selection Program § 1214.1105 Final ranking. Final rankings will be based on a combination of... preference will be included in this final ranking in accordance with applicable regulations. ...

  11. Improvement in PWR flexibility the french program 1975-1995

    International Nuclear Information System (INIS)

    Gautier, A.; Miossec, C.

    1985-12-01

    Between 1975 and 1985, a substantial effort was launched in France to greatly improve PWR's flexibility, resulting in the current situation where both frequency control and load follow are now routinely performed on most plants in operation. Based on rapidly accumulating operational experience and on all expertise acquired in the past decade, a second-generation core control strategy is now being finalized for application on all future 1400 MW plants (with commercial operation scheduled in 1992 for first unit). This 20-year program is discussed

  12. Training and certification program of the operating staff for a 90-day test of a regenerative life support system

    Science.gov (United States)

    1972-01-01

    Prior to beginning a 90-day test of a regenerative life support system, a need was identified for a training and certification program to qualify an operating staff for conducting the test. The staff was responsible for operating and maintaining the test facility, monitoring and ensuring crew safety, and implementing procedures to ensure effective mission performance with good data collection and analysis. The training program was designed to ensure that each operating staff member was capable of performing his assigned function and was sufficiently cross-trained to serve at certain other positions on a contingency basis. Complicating the training program were budget and schedule limitations, and the high level of sophistication of test systems.

  13. Integrated plant safety assessment: Systematic Evaluation Program, San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206): Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of San Onofre Nuclear Generating Station, Unit 1, operated by Southern California Edison Company. The San Onofre plant is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. This report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the draft report issued in April 1985

  14. INEL Geothermal Environmental Program. Final environmental report

    Energy Technology Data Exchange (ETDEWEB)

    Thurow, T.L.; Cahn, L.S.

    1982-09-01

    An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

  15. DIII-D Research Operations annual report to the US Department of Energy, October 1, 1990--September 30, 1991. Magnetic Fusion Research Program

    Energy Technology Data Exchange (ETDEWEB)

    Simonen, T.C.; Evans, T.E. [eds.

    1992-03-01

    This report discusses the following topics on Doublet-3 research operations: DIII-D Program Overview; Boundary Plasma Research Program/Scientific Progress; Radio Frequency Heating and Current Drive; Core Physics; DIII-D Operations; Program Development; Support Services; ITER Contributions; Burning Plasma Experiment Contributions; and Collaborative Efforts.

  16. The acceptance of dental operating microscope among advance education specialty programs in endodontics in the middle east

    Directory of Open Access Journals (Sweden)

    Mansour Alrejaie

    2012-01-01

    Full Text Available Aim: To present the current situation of dental operating microscopy (DOM training in the available Advance Specialty Education Programs in Endodontics in Arab Middle-Eastern countries. Materials and Methods: A web-based survey was sent to the electronic mail address of Advance Specialty Education programs of 15 Arab and middle east countries. The questions were limited to those who have an advanced specialty education program in Endodontics at their University if they are using an operating microscope? Results: Out of 15 countries, only 4 countries have microscopic technology in their Advance Education Programs in Endodontics. Conclusion: Few Arab Middle-Eastern countries have DOM in their advance education programs in endodontics. The highest authority in advancing endodontic education in the Arab Middle-East should consider in the near future the importance of this technology as standard care in teaching advance endodontics. An advance workshops should be organized regularly to provide enough knowledge about this standard educational technology.

  17. Safety-related operator actions: methodology for developing criteria

    International Nuclear Information System (INIS)

    Kozinsky, E.J.; Gray, L.H.; Beare, A.N.; Barks, D.B.; Gomer, F.E.

    1984-03-01

    This report presents a methodology for developing criteria for design evaluation of safety-related actions by nuclear power plant reactor operators, and identifies a supporting data base. It is the eleventh and final NUREG/CR Report on the Safety-Related Operator Actions Program, conducted by Oak Ridge National Laboratory for the US Nuclear Regulatory Commission. The operator performance data were developed from training simulator experiments involving operator responses to simulated scenarios of plant disturbances; from field data on events with similar scenarios; and from task analytic data. A conceptual model to integrate the data was developed and a computer simulation of the model was run, using the SAINT modeling language. Proposed is a quantitative predictive model of operator performance, the Operator Personnel Performance Simulation (OPPS) Model, driven by task requirements, information presentation, and system dynamics. The model output, a probability distribution of predicted time to correctly complete safety-related operator actions, provides data for objective evaluation of quantitative design criteria

  18. GPHS-RTGs in support of the Cassini RTG Program. Final technical report, January 11, 1991--April 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    As noted in the historical summary, this program encountered a number of changes in direction, schedule, and scope over the period 11 January 1991 to 31 December 1998. The report provides a comprehensive summary of all the varied aspects of the program over its seven and a quarter years, and highlights those aspects that provide information beneficial to future radioisotope programs. In addition to summarizing the scope of the Cassini GPHS-RTG Program provided as background, the introduction includes a discussion of the scope of the final report and offers reference sources for information on those topics not covered. Much of the design heritage of the GPHS-RTG comes from the Multi-Hundred Watt (MHW) RTGs used on the Lincoln Experimental Satellites (LES) 8/9 and Voyager spacecraft. The design utilized for the Cassini program was developed, in large part, under the GPHS-RTG program which produced the Galileo and Ulysses RTGs. Reports from those programs included detailed documentation of the design, development, and testing of converter components and full converters that were identical to, or similar to, components used in the Cassini program. Where such information is available in previous reports, it is not repeated here.

  19. GPHS-RTGs in support of the Cassini RTG Program. Final technical report, January 11, 1991 - April 30, 1998

    International Nuclear Information System (INIS)

    1998-08-01

    As noted in the historical summary, this program encountered a number of changes in direction, schedule, and scope over the period 11 January 1991 to 31 December 1998. The report provides a comprehensive summary of all the varied aspects of the program over its seven and a quarter years, and highlights those aspects that provide information beneficial to future radioisotope programs. In addition to summarizing the scope of the Cassini GPHS-RTG Program provided as background, the introduction includes a discussion of the scope of the final report and offers reference sources for information on those topics not covered. Much of the design heritage of the GPHS-RTG comes from the Multi-Hundred Watt (MHW) RTGs used on the Lincoln Experimental Satellites (LES) 8/9 and Voyager spacecraft. The design utilized for the Cassini program was developed, in large part, under the GPHS-RTG program which produced the Galileo and Ulysses RTGs. Reports from those programs included detailed documentation of the design, development, and testing of converter components and full converters that were identical to, or similar to, components used in the Cassini program. Where such information is available in previous reports, it is not repeated here

  20. 75 FR 10492 - Tribal Self-Governance Program; Negotiation Cooperative Agreement

    Science.gov (United States)

    2010-03-08

    ... of what was learned or is being learned during the planning process clearly stated? B. Thoroughness... clearly demonstrate knowledge and experience in the operation and management of health programs? Is the... of the Final Executive Summary which identifies the weaknesses and strengths of the application...